{"meta":{"query_hash":"9f7fd6ccc819","filters":{"venue":"2006 IEEE Power Engineering Society General Meeting"},"cohort_total":59,"direct_labels_cover":0,"predictions_cover":59,"exported":59,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/9f7fd6ccc819","api":"https://metacan.xera.ac/api/v1/cohort?venue=2006+IEEE+Power+Engineering+Society+General+Meeting"},"results":[{"id":"W1966967960","doi":"10.1109/pes.2006.1708938","title":"Research activities on the environmental impact of AC and DC power transmission systems","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Aerosol Filtration and Electrostatic Precipitation","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power transmission; Electrical engineering; Power transmission; Transmission (telecommunications); Voltage; Transmission system; Power (physics); Engineering; Telecommunications; Environmental science; Physics","score_opus":0.009112052875464316,"score_gpt":0.23654692756709023,"score_spread":0.2274348746916259,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966967960","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15435553,0.24909794,0.017788243,0.0782139,0.005665819,0.00024794266,0.00058147457,0.0002803381,0.4937689],"genre_scores_gemma":[0.5091379,0.35380462,0.008511733,0.00679137,0.0054283575,0.0000765486,0.00052106386,0.00007587419,0.11565258],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99865746,0.00019967915,0.000041224637,0.00010381006,0.00082227605,0.0001756113],"domain_scores_gemma":[0.9956664,0.0017699846,0.00014715498,0.00013215338,0.0021027147,0.00018153548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002120299,0.00040443212,0.00037769644,0.0013746468,0.0013876838,0.0012871724,0.0005771025,0.0016315093,0.007943626],"category_scores_gemma":[0.0018371659,0.00014835021,0.00039760617,0.0019717999,0.0009406238,0.001259942,0.00060637994,0.00093259866,0.00058345275],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039372637,0.00044225733,0.011097384,0.0023539497,0.0001080337,0.0015895132,0.0020015233,0.012577556,0.043220162,0.04276374,0.082059406,0.80139273],"study_design_scores_gemma":[0.0000413569,0.0014022497,0.029391134,0.0010793528,0.00012493099,0.0015430633,0.0041403035,0.0025346174,0.04957182,0.013229817,0.89684236,0.0000990261],"about_ca_topic_score_codex":0.02683801,"about_ca_topic_score_gemma":0.02822995,"teacher_disagreement_score":0.02683801,"about_ca_system_score_codex":0.0019730604,"about_ca_system_score_gemma":0.002525874,"threshold_uncertainty_score":0.05336356},"labels":[],"label_agreement":null},{"id":"W1969945783","doi":"10.1109/pes.2006.1709113","title":"Gas insulated substation GIS","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems and Technologies","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Switchgear; Modular design; Engineering; Reliability engineering; Automotive engineering; Electrical engineering; Power transmission; Power (physics); Computer science","score_opus":0.004411897285943175,"score_gpt":0.1765875252714136,"score_spread":0.17217562798547043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969945783","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4198136,0.00111457,0.29062605,0.0005733351,0.0003683378,0.00023503993,0.0075990115,0.0146243675,0.26504564],"genre_scores_gemma":[0.9417825,0.00044785708,0.0299013,0.00007663269,0.00003372245,0.000047887414,0.0029337453,0.00027938944,0.02449706],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99987125,0.000028822715,0.000005027818,0.000027748529,0.00004847748,0.000018630919],"domain_scores_gemma":[0.99991465,0.000009457808,0.000011547109,0.000030245279,0.000024647345,0.000009381486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000078516845,0.00043177843,0.00026153345,0.00030201595,0.00027892704,0.0005479037,0.00040987445,0.00025116117,0.010898034],"category_scores_gemma":[0.00017229271,0.00009471643,0.00012558168,0.00050167996,0.00023613198,0.0005931906,0.00066972506,0.00023418917,0.002950915],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015583693,0.00014073712,0.013965143,0.00074510666,0.00010301228,0.0043366128,0.0008974306,0.12990808,0.27345723,0.087500155,0.074683204,0.41270497],"study_design_scores_gemma":[0.00021764536,0.0007803157,0.015922364,0.000087987006,0.000097347234,0.0040068673,0.00055930775,0.119939305,0.18911679,0.023014516,0.64619577,0.00006171843],"about_ca_topic_score_codex":0.0011290283,"about_ca_topic_score_gemma":0.001087533,"teacher_disagreement_score":0.010898034,"about_ca_system_score_codex":0.00039056534,"about_ca_system_score_gemma":0.00027325755,"threshold_uncertainty_score":0.03645754},"labels":[],"label_agreement":null},{"id":"W1984278330","doi":"10.1109/pes.2006.1708934","title":"Research and technology shaping the future of electric power systems","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"","keywords":"Reliability (semiconductor); Electricity; Electric power industry; Presentation (obstetrics); Electric power; Mains electricity; Electric power quality; Risk analysis (engineering); Quality (philosophy); Environmentally friendly; Power (physics); Emerging technologies; Computer science; Business; Engineering; Electrical engineering","score_opus":0.007594937809834022,"score_gpt":0.21825573799764883,"score_spread":0.2106608001878148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984278330","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025522478,0.28057262,0.08186811,0.1370919,0.0067872712,0.00011471042,0.00012374975,0.00039294205,0.4675261],"genre_scores_gemma":[0.3897601,0.45451933,0.0509541,0.0113864755,0.00870627,0.00012433245,0.0001719355,0.00013416106,0.08424319],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992244,0.00022548187,0.000038752278,0.0000777569,0.00037243808,0.00006108886],"domain_scores_gemma":[0.9991829,0.0002956178,0.0000484747,0.00006195859,0.00034723105,0.000063857005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015104228,0.00036086017,0.0003589159,0.0006932747,0.0007967227,0.0035932902,0.00057013636,0.0022376804,0.005656265],"category_scores_gemma":[0.0019993465,0.00021100896,0.00025812403,0.0008871225,0.002198237,0.0056643193,0.0010373805,0.0022810316,0.0013181895],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031057985,0.00005953317,0.00060293806,0.00055479666,0.00001518525,0.00029133263,0.0009793191,0.0054418608,0.0038697359,0.7378056,0.024209933,0.22613873],"study_design_scores_gemma":[0.000009898036,0.000084837266,0.0005281496,0.00061320385,0.000013394368,0.00030540786,0.0007588398,0.003909851,0.0015574562,0.36935812,0.6228346,0.000026326084],"about_ca_topic_score_codex":0.00086983974,"about_ca_topic_score_gemma":0.0011425382,"teacher_disagreement_score":0.005656265,"about_ca_system_score_codex":0.001501667,"about_ca_system_score_gemma":0.0019260094,"threshold_uncertainty_score":0.01892209},"labels":[],"label_agreement":null},{"id":"W1985607615","doi":"10.1109/pes.2006.1709543","title":"A hybrid algorithm for high speed transmission line protection","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Teshmont (Canada)","funders":"","keywords":"Transient (computer programming); Reliability (semiconductor); Relay; Transmission line; Fault (geology); Computer science; Fault detection and isolation; Electrical impedance; Limit (mathematics); Protective relay; Power-system protection; Line (geometry); Electric power transmission; High impedance; Transmission (telecommunications); Electronic engineering; Algorithm; Reliability engineering; Engineering; Electrical engineering; Telecommunications; Electric power system; Mathematics; Artificial intelligence","score_opus":0.005935470649652962,"score_gpt":0.19665467531730702,"score_spread":0.19071920466765405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1985607615","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036451444,0.000109436114,0.993072,0.00006160803,0.000058280104,0.000036694946,0.000019654244,0.00075163395,0.0022456013],"genre_scores_gemma":[0.15947458,0.00016513106,0.8275242,0.00011203704,0.000096872645,0.0002661693,0.00015391262,0.00018391492,0.012023181],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996321,0.00007845572,0.000019262814,0.000074816795,0.00016490107,0.000030302985],"domain_scores_gemma":[0.999554,0.00016567267,0.000027788918,0.00008599887,0.0001446731,0.000021884573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055465964,0.00052982755,0.0004571318,0.0005927133,0.00045404813,0.00092128833,0.0010439015,0.0009417407,0.01494293],"category_scores_gemma":[0.0013443257,0.00020111747,0.00027219718,0.0006567336,0.00037627903,0.001252233,0.0008610208,0.00073752133,0.0029275892],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030645175,0.00008276253,0.00042240683,0.000101943246,0.00004659243,0.00007122088,0.00007165834,0.22485436,0.012150841,0.038374364,0.0077383374,0.715779],"study_design_scores_gemma":[0.000042999567,0.000060363654,0.0000932056,0.0000074981167,0.00000691567,0.00007157582,0.000008189911,0.98434895,0.0020451078,0.007862041,0.005443488,0.000009662035],"about_ca_topic_score_codex":0.0011325076,"about_ca_topic_score_gemma":0.0013139979,"teacher_disagreement_score":0.01494293,"about_ca_system_score_codex":0.00043211418,"about_ca_system_score_gemma":0.00037444226,"threshold_uncertainty_score":0.049989104},"labels":[],"label_agreement":null},{"id":"W1993788402","doi":"10.1109/pes.2006.1709289","title":"Assessment of asset safety risk for transmission stations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Risk analysis (engineering); Asset (computer security); Risk assessment; Safety standards; Context (archaeology); Electricity; Hazardous waste; Business; Electric utility; Electric power industry; Operations management; Engineering; Computer science; Computer security; Reliability engineering","score_opus":0.0039776836728090854,"score_gpt":0.21719554366304777,"score_spread":0.21321785999023868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993788402","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77872545,0.000625053,0.19864261,0.0002894662,0.000027391805,0.00058421557,0.0010509534,0.0003047917,0.019750008],"genre_scores_gemma":[0.9734433,0.0003766416,0.022728324,0.000017618517,0.000009636223,0.00012697303,0.00049401,0.000025499323,0.0027780102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997959,0.00044764753,0.00011859104,0.00018064445,0.0012095824,0.00008456894],"domain_scores_gemma":[0.9954652,0.0020101573,0.001123619,0.0002600356,0.0010398497,0.00010104685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027003363,0.00080614234,0.0003693468,0.00337479,0.00036431194,0.0013136688,0.0008780604,0.00090120325,0.0024659822],"category_scores_gemma":[0.006814354,0.00027616264,0.0009647048,0.0013640235,0.00036684982,0.0010576728,0.000986637,0.0005721876,0.0004249774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003663695,0.00031509946,0.19512323,0.00065807503,0.00056409865,0.0012606636,0.0015714278,0.6118447,0.030757023,0.00985955,0.0016971608,0.14598253],"study_design_scores_gemma":[0.00003091166,0.0016933727,0.1973187,0.00032372397,0.00040716497,0.001188872,0.003113808,0.7590514,0.018513668,0.01174792,0.0064545725,0.00015587201],"about_ca_topic_score_codex":0.0033072755,"about_ca_topic_score_gemma":0.0028688153,"teacher_disagreement_score":0.00337479,"about_ca_system_score_codex":0.0011139903,"about_ca_system_score_gemma":0.0005945717,"threshold_uncertainty_score":0.014280975},"labels":[],"label_agreement":null},{"id":"W1994725038","doi":"10.1109/pes.2006.1708864","title":"IEEE Power Engineering Society Energy Development and Power Generation Committee Panel Session Impacts of GHG Programs and Markets on the Power Industry 2006 General Meeting, Montreal, Canada, June 21, 2:00 pm to 5:00 pm","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Renewable energy and sustainable power systems","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Session (web analytics); Greenhouse gas; Electric power industry; Panel discussion; Power (physics); Electricity generation; Engineering; Engineering management; Telecommunications; Environmental economics; Business; Electrical engineering; Economics; Electricity","score_opus":0.007992352161058458,"score_gpt":0.19213416388336788,"score_spread":0.18414181172230942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994725038","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029854642,0.0068588345,0.013922354,0.045733,0.008859061,0.00037701256,0.008587623,0.0015244798,0.88428307],"genre_scores_gemma":[0.11813085,0.007436042,0.0038284983,0.0024057773,0.0018272158,0.000102869475,0.0063728243,0.00044495103,0.8594511],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99952745,0.000054936452,0.000011331351,0.000039520288,0.00025693382,0.00010994916],"domain_scores_gemma":[0.99893385,0.000063000036,0.00001998721,0.000044438093,0.0008453337,0.00009332848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009851439,0.00061663176,0.00044189463,0.0011101252,0.0016942451,0.003063584,0.000559436,0.0012752466,0.050137963],"category_scores_gemma":[0.0010553312,0.00042293262,0.00045324705,0.0016561672,0.00043041984,0.0009343401,0.00062189024,0.0015958035,0.0074178046],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014664637,0.00009493926,0.0028847198,0.00007909704,0.00003451542,0.000111529705,0.000107834196,0.002269129,0.0013240175,0.0037279315,0.9356335,0.053586148],"study_design_scores_gemma":[0.000038771213,0.00007602489,0.020894175,0.00012522473,0.00006126058,0.00007792216,0.00025393162,0.0019475265,0.003317002,0.0021417586,0.9710306,0.000035872115],"about_ca_topic_score_codex":0.20642698,"about_ca_topic_score_gemma":0.51137215,"teacher_disagreement_score":0.793573,"about_ca_system_score_codex":0.0034549304,"about_ca_system_score_gemma":0.0049183504,"threshold_uncertainty_score":0.41045088},"labels":[],"label_agreement":null},{"id":"W2002644473","doi":"10.1109/pes.2006.1709430","title":"Integration of distributed generation and wind energy in Canada","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"Natural Resources Canada; BC Hydro","keywords":"Wind power; Distributed generation; Electricity generation; Natural resource; Computer science; Renewable energy; Engineering; Power (physics); Political science; Electrical engineering","score_opus":0.0026785143898574266,"score_gpt":0.14821270772649053,"score_spread":0.14553419333663312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2002644473","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4349327,0.011769681,0.013791554,0.01247666,0.00035225315,0.00020221714,0.002974783,0.00032428122,0.52317584],"genre_scores_gemma":[0.94095564,0.0059433645,0.005301668,0.00051479746,0.000018652972,0.000027997608,0.000896665,0.00005278503,0.04628846],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991504,0.000042992753,0.000020592748,0.000062471874,0.00045457864,0.0002688716],"domain_scores_gemma":[0.9993993,0.00002451217,0.000027539701,0.000012581208,0.00044718513,0.00008885043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033034448,0.00023239838,0.00018059365,0.0011457431,0.0027274496,0.0024019661,0.0005252969,0.00025161848,0.00414621],"category_scores_gemma":[0.00085814635,0.00018770737,0.00025983714,0.0032733,0.0006036642,0.00057568337,0.0011033246,0.00054980605,0.00020851477],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005223843,0.00017512323,0.118552744,0.0007347113,0.00018813784,0.0038241628,0.005143363,0.05580494,0.007634075,0.31369433,0.052897107,0.44082895],"study_design_scores_gemma":[0.00013714432,0.0001070498,0.17865176,0.0005859155,0.00022796466,0.00086406915,0.009414549,0.03051352,0.0046258015,0.014571235,0.7601132,0.0001878157],"about_ca_topic_score_codex":0.99472934,"about_ca_topic_score_gemma":0.99753284,"teacher_disagreement_score":0.054528076,"about_ca_system_score_codex":0.054528076,"about_ca_system_score_gemma":0.094758,"threshold_uncertainty_score":0.39563072},"labels":[],"label_agreement":null},{"id":"W2003657011","doi":"10.1109/pes.2006.1709558","title":"International power engineering research collaborations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"George (robot); Renewable energy; Power engineering; Power (physics); Engineering; Key (lock); Panel discussion; Engineering management; Telecommunications; Electrical engineering; Electric power system; Computer science; Business; Computer security","score_opus":0.01013856854834664,"score_gpt":0.2354843770574615,"score_spread":0.22534580850911487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003657011","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044778287,0.056087546,0.018486293,0.11612633,0.07472563,0.0007063534,0.0027069224,0.0010038904,0.7256793],"genre_scores_gemma":[0.07021132,0.052511137,0.018802145,0.031962216,0.024131678,0.00084310584,0.007350226,0.0010603102,0.79312795],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.98124415,0.004731387,0.0012179195,0.001617996,0.007921078,0.0032674195],"domain_scores_gemma":[0.95408803,0.004957883,0.0020765741,0.0033849087,0.019910004,0.015582591],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022022948,0.0014135056,0.0009155436,0.003760791,0.004095732,0.011194808,0.0017700924,0.0036376817,0.13844042],"category_scores_gemma":[0.023954062,0.00046420173,0.00089954416,0.00806394,0.0009901951,0.0062054396,0.009643325,0.0059837727,0.03961612],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011743526,0.00011668396,0.0007885874,0.00070560887,0.000023715369,0.00018978296,0.0010870193,0.00040365336,0.00084119564,0.066200286,0.7628539,0.16667214],"study_design_scores_gemma":[0.000005369937,0.000012629869,0.00018785645,0.0001290876,0.0000034538352,0.00006319532,0.0002895237,0.000031310698,0.00011165115,0.0025464678,0.99661523,0.0000042648194],"about_ca_topic_score_codex":0.001415214,"about_ca_topic_score_gemma":0.0028599468,"teacher_disagreement_score":0.13844042,"about_ca_system_score_codex":0.003157914,"about_ca_system_score_gemma":0.016519638,"threshold_uncertainty_score":0.46312934},"labels":[],"label_agreement":null},{"id":"W2045085958","doi":"10.1109/pes.2006.1709373","title":"One day ahead prediction of wind speed using annual trends","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind speed; Wind power; Computer science; Interval (graph theory); Time series; Meteorology; Data set; Set (abstract data type); Wind power forecasting; Prediction interval; Power (physics); Electric power system; Machine learning; Artificial intelligence; Engineering; Mathematics","score_opus":0.010279437064976858,"score_gpt":0.19916512096832706,"score_spread":0.1888856839033502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045085958","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89655423,0.00023947585,0.09926489,0.000106013504,0.0000951046,0.000022697488,0.000771499,0.0008786436,0.0020674558],"genre_scores_gemma":[0.98705894,0.00017414275,0.011165824,0.000006019311,0.000019331412,0.000010981981,0.0008622537,0.00001979951,0.00068266894],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999083,0.000013859325,0.0000057328593,0.000025878286,0.000033603363,0.000012585287],"domain_scores_gemma":[0.9996836,0.00011640619,0.000053342028,0.00005251469,0.00007620081,0.000017887203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029270933,0.00033875185,0.00037068562,0.0005040192,0.00019671649,0.00038835534,0.00023950776,0.00026453304,0.0005763392],"category_scores_gemma":[0.0011276476,0.00014415468,0.00028249345,0.0005394205,0.000080958445,0.0006140112,0.00016289104,0.00040803596,0.00028645562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005321144,0.00034001903,0.08058647,0.00016895449,0.00018783633,0.00024501001,0.00013545224,0.60755736,0.021827422,0.0018177887,0.0026008245,0.28400078],"study_design_scores_gemma":[0.00000940182,0.000094098796,0.018021604,0.000005902335,0.000024667948,0.000039126946,0.000015621516,0.9771953,0.0034240626,0.00055418105,0.00060484913,0.000011248857],"about_ca_topic_score_codex":0.0044149733,"about_ca_topic_score_gemma":0.0050625745,"teacher_disagreement_score":0.0044149733,"about_ca_system_score_codex":0.000114008835,"about_ca_system_score_gemma":0.00024877005,"threshold_uncertainty_score":0.008778572},"labels":[],"label_agreement":null},{"id":"W2067923731","doi":"10.1109/pes.2006.1709228","title":"Induction machine test case for the 34-bus test feeder: a wind turbine time-domain model","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Research Manitoba","funders":"","keywords":"Wind power; Turbine; Time domain; Power flow; Domain (mathematical analysis); Engineering; Test (biology); Flow (mathematics); Computer science; Power (physics); Electric power system; Automotive engineering; Marine engineering; Electrical engineering; Aerospace engineering","score_opus":0.0055639580560695465,"score_gpt":0.19501538418970762,"score_spread":0.18945142613363808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067923731","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8271757,0.00020384378,0.115390606,0.0007787112,0.0001112371,0.00029735893,0.0031731385,0.0012034512,0.051666044],"genre_scores_gemma":[0.9896169,0.000049909428,0.0053361636,0.00003377543,0.000008730984,0.00009247689,0.00057207997,0.000043986063,0.0042460617],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998481,0.000053785807,0.000008345247,0.000019285619,0.00004546508,0.00002501437],"domain_scores_gemma":[0.9996191,0.00020613406,0.000029661105,0.000041908,0.00008085917,0.000022225377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002346769,0.0006354383,0.0005650613,0.00037190216,0.00039484486,0.00061020255,0.0010557798,0.0015247363,0.007352074],"category_scores_gemma":[0.0008535283,0.00018117642,0.00045905288,0.00048919383,0.00028824017,0.0006336521,0.00021220864,0.0008508575,0.0009112392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002924186,0.00016098222,0.0014760428,0.00009097066,0.00003068774,0.0007842681,0.00007473314,0.9800339,0.0035896858,0.005139201,0.0023282804,0.0059989104],"study_design_scores_gemma":[0.000052008978,0.00014838846,0.0006918931,0.0000061717883,0.0000126899695,0.000058681635,0.0000310916,0.9952047,0.0017435038,0.0009683574,0.0010734072,0.000009181671],"about_ca_topic_score_codex":0.012976309,"about_ca_topic_score_gemma":0.007596022,"teacher_disagreement_score":0.012976309,"about_ca_system_score_codex":0.000518237,"about_ca_system_score_gemma":0.00046081233,"threshold_uncertainty_score":0.025801599},"labels":[],"label_agreement":null},{"id":"W2079429754","doi":"10.1109/pes.2006.1709086","title":"Update on the Gulf Cooperation Council (GCC) electricity grid system interconnection","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Jewish and Middle Eastern Studies","field":"Social Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Interconnection; Electricity; Principal (computer security); Grid; Business; Power sharing; Telecommunications; Computer science; Engineering; Computer security; Electrical engineering; Geography; Power (physics)","score_opus":0.017313607241849018,"score_gpt":0.21584315200670007,"score_spread":0.19852954476485105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079429754","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032242443,0.052427266,0.007919713,0.20258881,0.13727333,0.000888219,0.025468951,0.0026407568,0.53855056],"genre_scores_gemma":[0.24577735,0.09902285,0.05638556,0.12985113,0.03794354,0.0014431557,0.049908552,0.001678575,0.37798932],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971283,0.00038544822,0.00031408074,0.000103360006,0.0017875681,0.00028131687],"domain_scores_gemma":[0.98463744,0.0017035842,0.00099575,0.0005121003,0.011423643,0.00072739227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042775343,0.00083378627,0.00043183257,0.0034904196,0.0014420555,0.0032004078,0.0012694726,0.0039971787,0.0047052274],"category_scores_gemma":[0.015567759,0.00030383424,0.0004113249,0.0057682428,0.0007312699,0.00211518,0.0014062726,0.004346309,0.0019188656],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006039426,0.00004034744,0.004593672,0.00043834237,0.000021031346,0.00052488205,0.00067349133,0.0010453061,0.000501924,0.006767921,0.9073243,0.078008436],"study_design_scores_gemma":[0.000005095934,0.000011124738,0.0039197453,0.0002978601,0.000011860181,0.000067800145,0.0002273724,0.00007996036,0.00016435552,0.0003892234,0.99481356,0.00001203859],"about_ca_topic_score_codex":0.1227388,"about_ca_topic_score_gemma":0.121536605,"teacher_disagreement_score":0.1227388,"about_ca_system_score_codex":0.0035457064,"about_ca_system_score_gemma":0.00941262,"threshold_uncertainty_score":0.24404877},"labels":[],"label_agreement":null},{"id":"W2081019793","doi":"10.1109/pes.2006.1709225","title":"The flicker meter - IEEE Std 1453/spl trade/-2004","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Flicker; Incandescent light bulb; Electric light; Metre; Voltage; Electrification; Rural electrification; Power quality; Observer (physics); Electrical engineering; Computer science; Engineering; Physics","score_opus":0.008199823700747889,"score_gpt":0.2020812126485451,"score_spread":0.1938813889477972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081019793","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035541713,0.010096003,0.70533586,0.0027393016,0.004599301,0.0020542655,0.014879511,0.032114092,0.19263993],"genre_scores_gemma":[0.33488148,0.00602999,0.41808838,0.0034513134,0.0010457871,0.0033801945,0.023348011,0.0035962018,0.20617875],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99291116,0.001450599,0.0006635349,0.0007441628,0.0039764987,0.00025405554],"domain_scores_gemma":[0.9932682,0.0010674228,0.00069506106,0.0009875913,0.0038460493,0.0001356042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002813965,0.001099488,0.00079306524,0.0033240926,0.00082466047,0.002144151,0.001729957,0.0018183844,0.013772445],"category_scores_gemma":[0.008125501,0.0004516812,0.00028936245,0.0028580828,0.0010295773,0.0017622915,0.0008218987,0.0014724294,0.0157285],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009759437,0.0002758109,0.01038798,0.0010672668,0.00005851333,0.00035180358,0.0008429685,0.003391524,0.08430542,0.038423445,0.2060187,0.6539006],"study_design_scores_gemma":[0.00014616709,0.00068760087,0.019848388,0.0005407837,0.00008785499,0.001956507,0.00045934273,0.014756295,0.13429539,0.011911377,0.8150934,0.00021689685],"about_ca_topic_score_codex":0.0011727711,"about_ca_topic_score_gemma":0.0026206619,"teacher_disagreement_score":0.013772445,"about_ca_system_score_codex":0.0013954618,"about_ca_system_score_gemma":0.0011351369,"threshold_uncertainty_score":0.046073437},"labels":[],"label_agreement":null},{"id":"W2096612321","doi":"10.1109/pes.2006.1709503","title":"On-site calibrations of multifunction electrical standards used for testing revenue meters","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Advanced Electrical Measurement Techniques","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada; Manitoba Hydro","keywords":"Revenue; Calibration; Electricity; Metrology; Service (business); Legislation; Test site; Environmental science; Engineering; Electrical engineering; Business; Accounting","score_opus":0.010225027112582365,"score_gpt":0.23154171027350612,"score_spread":0.22131668316092376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096612321","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68672884,0.00128844,0.22695069,0.0006399847,0.00068127504,0.0010127231,0.0015451404,0.0061345873,0.07501835],"genre_scores_gemma":[0.9017797,0.00039493805,0.08157236,0.00032409295,0.00007546876,0.00019099959,0.0011966809,0.00058486516,0.013880915],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9871976,0.0021880325,0.0004036465,0.00096000754,0.0086411685,0.0006095468],"domain_scores_gemma":[0.9928376,0.0011196922,0.0006411974,0.0015041729,0.0037277718,0.00016952117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039059883,0.00076615333,0.0006792607,0.0020881612,0.0011639157,0.0012109535,0.002606927,0.0013317626,0.0066287084],"category_scores_gemma":[0.008350976,0.00035689495,0.00053769007,0.0022043546,0.00058779307,0.0013860011,0.0011778902,0.0010387973,0.0022024424],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012409346,0.001115018,0.05693476,0.0005679942,0.00014020254,0.00046855814,0.001608453,0.014093547,0.44448927,0.010800079,0.012212297,0.456329],"study_design_scores_gemma":[0.0001587909,0.0013564872,0.029372793,0.00012449492,0.000091154994,0.0015053712,0.00064285577,0.021229781,0.8760108,0.0023265781,0.06704729,0.0001335311],"about_ca_topic_score_codex":0.00295401,"about_ca_topic_score_gemma":0.006888362,"teacher_disagreement_score":0.0066287084,"about_ca_system_score_codex":0.0021445684,"about_ca_system_score_gemma":0.0010295346,"threshold_uncertainty_score":0.022175312},"labels":[],"label_agreement":null},{"id":"W2096907829","doi":"10.1109/pes.2006.1709608","title":"Risk assessment of rural diesel generation stations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"Saint Petersburg State University; BC Hydro","keywords":"Reliability (semiconductor); Reliability engineering; Probabilistic logic; Computer science; Unit (ring theory); Engineering","score_opus":0.00472748739580314,"score_gpt":0.21115672972088517,"score_spread":0.20642924232508203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096907829","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86436975,0.00014252662,0.13209417,0.00011028982,0.000004206505,0.00007536348,0.00018173644,0.000330173,0.002691792],"genre_scores_gemma":[0.9931277,0.00005923159,0.006088394,0.0000037501798,0.0000024201115,0.000014280694,0.000065555,0.000010532183,0.00062815467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99967325,0.00014381543,0.00001286502,0.000043887878,0.00010585541,0.000020318987],"domain_scores_gemma":[0.99870586,0.00068892917,0.0002701813,0.000076807024,0.00021463507,0.000043603766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006860609,0.00047743224,0.00026765297,0.00076795666,0.00021335534,0.00040424673,0.000550257,0.00045472968,0.0012137248],"category_scores_gemma":[0.0028428773,0.000221344,0.0002901014,0.000384269,0.00019170035,0.0005185629,0.00052270514,0.00022581754,0.00016825681],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025702638,0.00006841801,0.03451443,0.00005866133,0.0000388977,0.0003920867,0.00022502268,0.9099105,0.010173951,0.0022317332,0.00032256724,0.041806694],"study_design_scores_gemma":[0.000017450007,0.00027684987,0.013748781,0.000007887252,0.000024958774,0.00022506148,0.00014525864,0.9764984,0.0059495075,0.0023214393,0.0007682636,0.000016144468],"about_ca_topic_score_codex":0.0019851886,"about_ca_topic_score_gemma":0.00170854,"teacher_disagreement_score":0.0019851886,"about_ca_system_score_codex":0.0005533891,"about_ca_system_score_gemma":0.00024497116,"threshold_uncertainty_score":0.004060328},"labels":[],"label_agreement":null},{"id":"W2104120134","doi":"10.1109/pes.2006.1708972","title":"Experimental testing of a novel control for inverter-fed three-phase induction motor","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Multilevel Inverters and Converters","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"DSPACE; Inverter; Control theory (sociology); Induction motor; Harmonic; Digital signal processor; Digital signal processing; Digital control; Computer science; Pulse-width modulation; Engineering; Electronic engineering; Voltage; Control (management); Algorithm; Physics; Electrical engineering; Acoustics","score_opus":0.01824539952909969,"score_gpt":0.23079926116055752,"score_spread":0.21255386163145784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104120134","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8646129,0.00008939636,0.13025692,0.00009767371,0.00008140912,0.00027072188,0.00013059235,0.0010210236,0.0034393098],"genre_scores_gemma":[0.9770443,0.000036601123,0.02187741,0.000024722161,0.000007780182,0.00008715033,0.00006267016,0.000019342291,0.00083997974],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996519,0.000047679547,0.000031276853,0.000055731296,0.00017888061,0.00003463918],"domain_scores_gemma":[0.99957925,0.00011782537,0.00006409482,0.000070843605,0.0001361123,0.00003193025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028157383,0.00028686883,0.00023816878,0.0002033816,0.00017538315,0.00023518581,0.00065114716,0.00041347058,0.0016818166],"category_scores_gemma":[0.0007139879,0.00011541396,0.0001770295,0.00013398135,0.00023759586,0.00027425613,0.00017791317,0.00035387135,0.00021067848],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072694756,0.0003673841,0.0009163173,0.000332117,0.000023185821,0.00016876437,0.0001371172,0.0037674254,0.9512618,0.0004866125,0.00020882768,0.041603524],"study_design_scores_gemma":[0.0003366153,0.0099781025,0.012034213,0.000030427904,0.000054252447,0.00040839912,0.000074570526,0.08647872,0.88657635,0.00020327537,0.003787685,0.00003749213],"about_ca_topic_score_codex":0.00041798785,"about_ca_topic_score_gemma":0.00046715877,"teacher_disagreement_score":0.0016818166,"about_ca_system_score_codex":0.00015078005,"about_ca_system_score_gemma":0.00013642735,"threshold_uncertainty_score":0.0056262016},"labels":[],"label_agreement":null},{"id":"W2105551177","doi":"10.1109/pes.2006.1709083","title":"A time domain model for transient simulation of synchronous machines using phase coordinates","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Stator; Synchronous motor; Electromagnetic coil; Computer science; Control theory (sociology); Transient (computer programming); Time domain; Electric power system; Matrix representation; Algorithm; Topology (electrical circuits); Electronic engineering; Power (physics); Engineering; Physics; Electrical engineering; Artificial intelligence","score_opus":0.00836885266104822,"score_gpt":0.2363056743513223,"score_spread":0.22793682169027407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105551177","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0057558175,0.000063815336,0.98672557,0.00007288539,0.00005273336,0.000050401424,0.0002191032,0.0012007479,0.005858905],"genre_scores_gemma":[0.5120045,0.00057087967,0.46626908,0.00013093631,0.00010503704,0.0010056815,0.0014439854,0.0007731242,0.01769678],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977165,0.00006714844,0.000013982669,0.000033997447,0.000094961346,0.000018270051],"domain_scores_gemma":[0.99978787,0.00007119762,0.000024116538,0.000050179264,0.00005326864,0.000013451117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028755973,0.00058374705,0.00064563233,0.00035154633,0.00038889027,0.000751586,0.0010099116,0.0010633189,0.007597804],"category_scores_gemma":[0.0007973296,0.0003702946,0.00068606844,0.00047584865,0.0003268652,0.0009057205,0.0004246554,0.0011564988,0.0022798541],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006896913,0.000046642464,0.00025782367,0.00009590495,0.00002333506,0.00014230542,0.0000868846,0.92509806,0.014402601,0.042042144,0.002350178,0.015385156],"study_design_scores_gemma":[0.000012027023,0.000023982959,0.00003797709,0.000004336671,0.0000047159942,0.0000259778,0.000004778693,0.9904986,0.0015965358,0.0028027666,0.0049836817,0.0000046674522],"about_ca_topic_score_codex":0.0016493762,"about_ca_topic_score_gemma":0.0012858136,"teacher_disagreement_score":0.007597804,"about_ca_system_score_codex":0.00036168142,"about_ca_system_score_gemma":0.0006182115,"threshold_uncertainty_score":0.025417209},"labels":[],"label_agreement":null},{"id":"W2107926956","doi":"10.1109/pes.2006.1709624","title":"Performance of various magnetic core models in comparison with the laboratory test results of a ferroresonance test on a 33 kV voltage transformer","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Magnetic Properties and Applications","field":"Materials Science","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Ferroresonance in electricity networks; Emtp; Magnetic core; Transformer; Inductance; Voltage; Control theory (sociology); Electronic engineering; Electric power system; Mechanics; Electrical engineering; Engineering; Power (physics); Computer science; Physics; Electromagnetic coil","score_opus":0.009043162219580859,"score_gpt":0.19965182542682783,"score_spread":0.19060866320724698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107926956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9267776,0.00029069255,0.06522513,0.00015141502,0.000054959623,0.000054321856,0.0002763202,0.0025157272,0.0046539255],"genre_scores_gemma":[0.99701583,0.000031609503,0.0021523978,0.000010370719,0.000002136049,0.000011178826,0.0001155056,0.00004857871,0.0006124025],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997106,0.00008742419,0.000019107229,0.000057904617,0.00009820904,0.00002678809],"domain_scores_gemma":[0.9988085,0.00045652981,0.00012152244,0.00021742866,0.00034897527,0.000046999783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005042129,0.00056178414,0.00048810296,0.000403566,0.00020326606,0.0003501282,0.0009212405,0.0004912569,0.002183853],"category_scores_gemma":[0.0019050154,0.00014994446,0.0003195723,0.00023168464,0.00023720767,0.00050027104,0.00020689893,0.00024859366,0.00038087883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0037061498,0.00060489576,0.016335664,0.00048646086,0.00012515558,0.00036571285,0.0004326499,0.6994603,0.17739813,0.0023593572,0.0029389667,0.09578656],"study_design_scores_gemma":[0.000044044453,0.00070794515,0.002859266,0.000015181659,0.000031466072,0.00011037644,0.000058925787,0.9250036,0.07014253,0.0002594914,0.0007466877,0.0000206006],"about_ca_topic_score_codex":0.003244705,"about_ca_topic_score_gemma":0.0025520956,"teacher_disagreement_score":0.003244705,"about_ca_system_score_codex":0.0007157977,"about_ca_system_score_gemma":0.00027030386,"threshold_uncertainty_score":0.0073057413},"labels":[],"label_agreement":null},{"id":"W2109975151","doi":"10.1109/pes.2006.1709402","title":"Adaptive fuzzy control of SSSC to improve damping of power system oscillations","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Control theory (sociology); Identifier; Controller (irrigation); Electric power system; Adaptive control; Fuzzy logic; Computer science; Power (physics); Fuzzy control system; Control engineering; Engineering; Control (management); Physics; Artificial intelligence","score_opus":0.004098576658512859,"score_gpt":0.18318443292896802,"score_spread":0.17908585627045517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109975151","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23387018,0.00070056674,0.7531229,0.00017499244,0.00018229961,0.00007748723,0.00003888541,0.0009134291,0.010919144],"genre_scores_gemma":[0.9799035,0.00010245547,0.018446494,0.000029606254,0.000018924615,0.000020852882,0.000016084934,0.000005570798,0.0014563798],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99992,0.000013331793,0.0000075301864,0.000014238362,0.000037257952,0.0000075373855],"domain_scores_gemma":[0.9998435,0.00004664288,0.000022223643,0.000012835763,0.0000679517,0.0000068763225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019410373,0.00023323369,0.00014178238,0.00017727698,0.00012724429,0.00021578868,0.00029890734,0.00021254885,0.0010002098],"category_scores_gemma":[0.0005257151,0.00006194254,0.0001492105,0.00016786486,0.00015572214,0.0001437137,0.00013299094,0.00024032072,0.00012040553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034582827,0.00018843861,0.0011207713,0.00032221558,0.000075033095,0.00034976535,0.00024083375,0.33425358,0.21996713,0.009582548,0.002236757,0.43131712],"study_design_scores_gemma":[0.000047839552,0.0003578349,0.0010428149,0.00001338956,0.0000297074,0.00010172053,0.00001784285,0.97071314,0.02326986,0.0013958385,0.0029996315,0.000010346077],"about_ca_topic_score_codex":0.0017059018,"about_ca_topic_score_gemma":0.0027689924,"teacher_disagreement_score":0.0017059018,"about_ca_system_score_codex":0.00013307568,"about_ca_system_score_gemma":0.00018707915,"threshold_uncertainty_score":0.0033919215},"labels":[],"label_agreement":null},{"id":"W2110384814","doi":"10.1109/pes.2006.1709023","title":"Toward controlled wind farm output: adjustable power filtering","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Wind power; Control theory (sociology); Turbine; Power optimizer; Electric power system; Control engineering; Torque; Computer science; Power (physics); Power control; Grid; Engineering; Control (management); Maximum power point tracking; Mathematics; Physics; Electrical engineering; Mechanical engineering","score_opus":0.006846013343184392,"score_gpt":0.18206073356217894,"score_spread":0.17521472021899456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110384814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0486074,0.00046442126,0.9388806,0.00024613558,0.000050308452,0.000017132152,0.00002684443,0.00046667806,0.01124047],"genre_scores_gemma":[0.95163596,0.0006358421,0.04447878,0.000105174164,0.00007867128,0.000056587684,0.000038725928,0.000060287963,0.0029100536],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99977154,0.00004427954,0.000013631249,0.000050285176,0.00010153566,0.000018743378],"domain_scores_gemma":[0.99932504,0.00045925975,0.00005261599,0.000075176606,0.00007554646,0.0000124088565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003667124,0.00035256814,0.00035628097,0.00014780858,0.00018291936,0.00095030613,0.00051031826,0.00045943444,0.0015077873],"category_scores_gemma":[0.0018910932,0.00020936703,0.00017580642,0.00018148696,0.0006153789,0.0010782554,0.00036468357,0.0008607043,0.00029182516],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046684325,0.0001546021,0.0012345312,0.00040491772,0.00005113482,0.00028652322,0.0005162634,0.33045274,0.10506111,0.28378242,0.002018179,0.2755708],"study_design_scores_gemma":[0.00004016592,0.00010400705,0.0002540216,0.00002898563,0.000009053218,0.000034797056,0.000018086768,0.9342528,0.010631578,0.050357435,0.004253909,0.000015217925],"about_ca_topic_score_codex":0.0007642905,"about_ca_topic_score_gemma":0.0006363774,"teacher_disagreement_score":0.0015077873,"about_ca_system_score_codex":0.0003559722,"about_ca_system_score_gemma":0.00018980136,"threshold_uncertainty_score":0.005044043},"labels":[],"label_agreement":null},{"id":"W2112007466","doi":"10.1109/pes.2006.1709001","title":"Damping torque estimation and oscillatory stability margin prediction","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Damping torque; Control theory (sociology); Torque; Synchronizing; Electric power system; Nonlinear system; Line (geometry); Identification (biology); Instability; Ordinary least squares; Power (physics); Mathematics; Computer science; Physics; Mechanics; Statistics; Direct torque control; Voltage; Induction motor","score_opus":0.004640695065143477,"score_gpt":0.17455988561174196,"score_spread":0.1699191905465985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112007466","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48173296,0.00021428168,0.51404274,0.00009999305,0.00002444215,0.000025179721,0.00006182357,0.0007865328,0.0030119817],"genre_scores_gemma":[0.98994666,0.00003355059,0.00946496,0.0000046737655,0.0000051383977,0.000006440067,0.00003824468,0.000020570396,0.0004796958],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996754,0.00010354876,0.000012703687,0.000051003033,0.00012641381,0.00003088402],"domain_scores_gemma":[0.9991197,0.000432522,0.00019005938,0.00011068234,0.000118687756,0.000028231492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047991026,0.00044632578,0.0004322679,0.00075099425,0.0001314771,0.0005239285,0.00024749772,0.00040498868,0.00072117883],"category_scores_gemma":[0.004338055,0.0002106156,0.00017008344,0.00033750563,0.00032796894,0.0005463215,0.0005808444,0.00035211872,0.00023466862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052526477,0.00011968842,0.009701764,0.00014758363,0.00004574444,0.00014166799,0.00024711838,0.76002026,0.06415246,0.0023941407,0.00062317157,0.16188112],"study_design_scores_gemma":[0.000005137864,0.000070152404,0.0028629743,0.0000058874216,0.000004174401,0.000037325444,0.000021396254,0.9893209,0.006757212,0.00070371217,0.0002024925,0.000008790305],"about_ca_topic_score_codex":0.0016083875,"about_ca_topic_score_gemma":0.0013365186,"teacher_disagreement_score":0.0016083875,"about_ca_system_score_codex":0.00019901663,"about_ca_system_score_gemma":0.00020725057,"threshold_uncertainty_score":0.0031980276},"labels":[],"label_agreement":null},{"id":"W2113322605","doi":"10.1109/pes.2006.1709404","title":"Upgrading an existing 138 kV transmission line in Manitoba","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Thermal Analysis in Power Transmission","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Manitoba Hydro","funders":"Manitoba Hydro","keywords":"Line (geometry); Electric power transmission; Investment (military); Transmission line; Electrical engineering; Computer science; Engineering; Telecommunications; Reliability engineering; Electronic engineering","score_opus":0.010475606812948927,"score_gpt":0.21615325942851504,"score_spread":0.20567765261556611,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113322605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.990967,0.000060019138,0.0012563945,0.00008598345,0.000009225341,0.0000884924,0.00024089853,0.00008983247,0.007202218],"genre_scores_gemma":[0.9854693,0.00014710848,0.0050824448,0.000039885683,0.0000024432288,0.000028639837,0.00036943585,0.000015184893,0.008845524],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998753,0.000010925765,0.000003384318,0.000032421838,0.000043958204,0.0000340095],"domain_scores_gemma":[0.99976367,0.000015878197,0.000016304322,0.000014468434,0.00015412449,0.000035571797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011634325,0.00036974208,0.00012985105,0.0005651227,0.0018570466,0.0005433995,0.0005706528,0.00033470112,0.0022703498],"category_scores_gemma":[0.00032802214,0.00016099314,0.00012938003,0.001212208,0.0004786288,0.00022385389,0.00030071495,0.0003576993,0.00030413852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006439832,0.0005727017,0.4649734,0.0003737557,0.00006968835,0.024292197,0.009208484,0.049831577,0.16171606,0.0027400558,0.0065910933,0.27898708],"study_design_scores_gemma":[0.00014633726,0.0009504179,0.83213806,0.00013354256,0.00013289944,0.003404613,0.017083352,0.04564167,0.04647229,0.0006070921,0.053165346,0.00012437557],"about_ca_topic_score_codex":0.84256625,"about_ca_topic_score_gemma":0.9422636,"teacher_disagreement_score":0.15743375,"about_ca_system_score_codex":0.006953897,"about_ca_system_score_gemma":0.005201205,"threshold_uncertainty_score":0.3167218},"labels":[],"label_agreement":null},{"id":"W2114713258","doi":"10.1109/pes.2006.1708921","title":"The RECRE system: restoration planning for Hydro-Quebec's power system","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Oil and Gas Production Techniques","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Unavailability; Acronym; Plan (archaeology); Electric power system; Hydroelectricity; Computer science; Reliability engineering; Systems engineering; Power (physics); Operations research; Engineering; Electrical engineering","score_opus":0.005586154642901943,"score_gpt":0.20025003308938225,"score_spread":0.1946638784464803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114713258","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13936809,0.0021024887,0.19457811,0.004303936,0.00035762013,0.0020501586,0.14170201,0.08765513,0.4278825],"genre_scores_gemma":[0.540255,0.0016288098,0.22581075,0.00041523582,0.000057971396,0.0008295174,0.09869481,0.0035296353,0.12877837],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981266,0.000034154997,0.0000075768903,0.000038715636,0.00007654761,0.000030319443],"domain_scores_gemma":[0.99955326,0.000079583006,0.000031006373,0.00005898269,0.00021253774,0.000064537104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004843403,0.0006882095,0.0003725855,0.0010764735,0.0015238001,0.0017651696,0.0013164387,0.00072124344,0.039844],"category_scores_gemma":[0.0014271479,0.0003703741,0.00045916493,0.0013739399,0.0005037942,0.000750364,0.00071396003,0.0005903614,0.0034196558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000373158,0.00023875837,0.011835115,0.00052746385,0.00008665558,0.00081401534,0.0007241981,0.3300661,0.0030989568,0.014308179,0.39952892,0.23839846],"study_design_scores_gemma":[0.0003484623,0.000109528126,0.011890091,0.0001728821,0.000053314525,0.00022202313,0.0006747533,0.51543003,0.0026590675,0.0037159014,0.46460268,0.00012123658],"about_ca_topic_score_codex":0.8843319,"about_ca_topic_score_gemma":0.9306424,"teacher_disagreement_score":0.11566812,"about_ca_system_score_codex":0.0098905,"about_ca_system_score_gemma":0.014136954,"threshold_uncertainty_score":0.23269856},"labels":[],"label_agreement":null},{"id":"W2115910105","doi":"10.1109/pes.2006.1709589","title":"Topological observability analysis using heuristic rule based expert system","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Observability; Heuristic; Spanning tree; Observable; Minimum spanning tree; Computer science; Graph; Electric power system; Graph theory; Expert system; Tree (set theory); Mathematics; Mathematical optimization; Topology (electrical circuits); Algorithm; Theoretical computer science; Power (physics); Discrete mathematics; Artificial intelligence; Combinatorics; Applied mathematics","score_opus":0.010989975735971285,"score_gpt":0.2154739357472287,"score_spread":0.2044839600112574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115910105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0175559,0.00002369529,0.98068446,0.00004352291,0.0000055206933,0.000050932667,0.00005203941,0.00039442768,0.0011894571],"genre_scores_gemma":[0.61259556,0.000077775185,0.38592368,0.00005225624,0.00001706086,0.00019207108,0.0002921554,0.00004163498,0.00080773997],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846846,0.0005566048,0.0001002531,0.00025516946,0.0005306996,0.00008878105],"domain_scores_gemma":[0.99321073,0.00485782,0.000470911,0.00046023756,0.00091574923,0.000084608066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017020847,0.00056923635,0.0007570739,0.0012063248,0.00032892497,0.0011422988,0.0008522426,0.0005983622,0.001986681],"category_scores_gemma":[0.011520361,0.00025200215,0.00051612686,0.00046020083,0.00064412656,0.0010242966,0.000555047,0.00068771874,0.00022402663],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010469389,0.000087181776,0.0018451596,0.00012617296,0.00008963812,0.00024773326,0.00024043441,0.84528506,0.004566291,0.0174518,0.00074166013,0.12921424],"study_design_scores_gemma":[0.000009464884,0.000021733646,0.00021528071,0.0000073838737,0.000011119034,0.000023003406,0.000025582425,0.9898057,0.0009631297,0.008573351,0.0003372947,0.0000069675093],"about_ca_topic_score_codex":0.0033652226,"about_ca_topic_score_gemma":0.002464344,"teacher_disagreement_score":0.0033652226,"about_ca_system_score_codex":0.00070727355,"about_ca_system_score_gemma":0.000845102,"threshold_uncertainty_score":0.009001613},"labels":[],"label_agreement":null},{"id":"W2117858766","doi":"10.1109/pes.2006.1708872","title":"Line impact cost concept to calculate congestion costs in deregulated electricity market","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Electricity; Line (geometry); Network congestion; Computer science; Schedule; Reliability engineering; Operations research; Computer network; Engineering; Electrical engineering; Mathematics","score_opus":0.0036012330662299114,"score_gpt":0.21029790073907406,"score_spread":0.20669666767284414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117858766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06536823,0.00080013333,0.9227753,0.00014285298,0.00011915114,0.00014064656,0.00023930217,0.0003968309,0.010017661],"genre_scores_gemma":[0.8688143,0.00060325424,0.12611501,0.00006609104,0.00008124911,0.00019119972,0.0003722975,0.00013603707,0.003620596],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920005,0.00023277468,0.000023071212,0.000048310954,0.00042946145,0.00006639711],"domain_scores_gemma":[0.99894685,0.0005431293,0.000106901025,0.000091217815,0.000278103,0.000033786437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009840633,0.00081445434,0.00039866526,0.0017935452,0.0002510247,0.0008395584,0.0011484941,0.00041558628,0.0034214032],"category_scores_gemma":[0.0038927845,0.000215515,0.00042156907,0.0022268584,0.00037784336,0.002030442,0.00045856024,0.0007441233,0.0003834343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054369786,0.00004712642,0.0011757797,0.00004002406,0.000030647825,0.000055784378,0.000019902165,0.92630816,0.0010476878,0.026756834,0.0010733249,0.043390278],"study_design_scores_gemma":[0.000005905768,0.000029830708,0.00092764286,0.000005108453,0.000007773446,0.000033771496,0.0000078715975,0.99257976,0.0010786717,0.0038959563,0.0014177136,0.000010092517],"about_ca_topic_score_codex":0.0032080074,"about_ca_topic_score_gemma":0.0022512034,"teacher_disagreement_score":0.0034214032,"about_ca_system_score_codex":0.0013623417,"about_ca_system_score_gemma":0.00052240054,"threshold_uncertainty_score":0.011445701},"labels":[],"label_agreement":null},{"id":"W2118243046","doi":"10.1109/pes.2006.1708888","title":"Robust non-communication line protection scheme using novel quantities","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Tripping; Scheme (mathematics); Computer science; Modal; Circuit breaker; Transmission line; Fault (geology); Line (geometry); Electronic engineering; Fuse (electrical); Transmission (telecommunications); Engineering; Telecommunications; Electrical engineering; Mathematics","score_opus":0.021694474768647158,"score_gpt":0.2153805234008987,"score_spread":0.19368604863225153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118243046","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027113244,0.00022620165,0.96968937,0.00012674746,0.00007787607,0.00006289491,0.000028410313,0.0006948192,0.0019804281],"genre_scores_gemma":[0.87321126,0.000093276074,0.124315925,0.000068518406,0.00006961241,0.00006719025,0.00004975478,0.00002883631,0.002095576],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953675,0.0000864138,0.000033089276,0.000102447986,0.00021214178,0.00002914504],"domain_scores_gemma":[0.9994887,0.00011848207,0.00014360716,0.00013915631,0.000088961475,0.000021051137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003311536,0.0006271534,0.00038707498,0.0003084242,0.00028569327,0.0005253497,0.0011643282,0.000535428,0.001672317],"category_scores_gemma":[0.0009136208,0.00013032253,0.0001874182,0.00025939706,0.0003727658,0.0009570887,0.0006476148,0.000645981,0.00037700016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007759562,0.00022919118,0.00066159794,0.0003387352,0.00006542678,0.00037410346,0.00023111457,0.13308868,0.29315963,0.060081244,0.0033053046,0.507689],"study_design_scores_gemma":[0.00012541536,0.0007651277,0.0006590405,0.000018928713,0.00003546745,0.0003691091,0.000011858568,0.93340814,0.050446846,0.00833029,0.0057910597,0.000038811722],"about_ca_topic_score_codex":0.00021311989,"about_ca_topic_score_gemma":0.0003224033,"teacher_disagreement_score":0.001672317,"about_ca_system_score_codex":0.00035502206,"about_ca_system_score_gemma":0.00021278061,"threshold_uncertainty_score":0.005594492},"labels":[],"label_agreement":null},{"id":"W2122321076","doi":"10.1109/pes.2006.1708992","title":"Flicker representation via STFT and wavelets","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Manchester","keywords":"Flicker; Short-time Fourier transform; Wavelet; Wavelet transform; Fourier transform; Harmonic wavelet transform; Harmonic; Computer science; Time–frequency analysis; Harmonics; Time–frequency representation; Frequency domain; Electronic engineering; Discrete wavelet transform; Artificial intelligence; Mathematics; Fourier analysis; Computer vision; Acoustics; Engineering; Physics; Electrical engineering; Mathematical analysis","score_opus":0.008010412399739961,"score_gpt":0.2096385215388322,"score_spread":0.20162810913909224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122321076","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020346588,0.000691968,0.97661954,0.00010016937,0.000091960384,0.000024155925,0.00009537858,0.00031646964,0.0017137319],"genre_scores_gemma":[0.45958945,0.0039206287,0.52812403,0.000107489934,0.00037283733,0.00006668584,0.0007895051,0.00020123519,0.00682822],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99973565,0.000049067345,0.000016117732,0.000042504562,0.00013240807,0.000024287363],"domain_scores_gemma":[0.9996494,0.00013212836,0.00005576731,0.000046305307,0.00010040422,0.000015920925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041372393,0.000519947,0.00040169657,0.0010615259,0.00014579596,0.0007989263,0.00031888208,0.00055823196,0.001988531],"category_scores_gemma":[0.0017816196,0.00012879878,0.00033598935,0.0020044672,0.00026442157,0.0011683895,0.00034825,0.0006033375,0.00079919776],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002627866,0.000060709197,0.0014902394,0.0003204547,0.000062790736,0.0004427381,0.0001882721,0.09209885,0.07167476,0.03747772,0.0034246442,0.79249614],"study_design_scores_gemma":[0.000018099367,0.00013604165,0.0030006974,0.00004187707,0.000038501115,0.0005498924,0.00011625523,0.9456155,0.018849757,0.021262156,0.010330102,0.000041080573],"about_ca_topic_score_codex":0.0008827493,"about_ca_topic_score_gemma":0.0006054268,"teacher_disagreement_score":0.001988531,"about_ca_system_score_codex":0.00015623482,"about_ca_system_score_gemma":0.00020064037,"threshold_uncertainty_score":0.0066522956},"labels":[],"label_agreement":null},{"id":"W2123958848","doi":"10.1109/pes.2006.1709255","title":"Nonlinear state space modeling of a variable speed wind power generation system","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Nonlinear system; Control theory (sociology); State space; State-space representation; Variable (mathematics); State variable; Computer science; Wind power; Representation (politics); Wind speed; Trajectory; Linear model; Mathematics; Engineering; Control (management); Algorithm; Physics; Artificial intelligence; Meteorology","score_opus":0.005527981933733119,"score_gpt":0.17596636045449043,"score_spread":0.17043837852075733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2123958848","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06497548,0.0004580459,0.90167344,0.000398987,0.0000780639,0.000087051376,0.00059214357,0.0009604749,0.03077624],"genre_scores_gemma":[0.9616423,0.00077522144,0.01815381,0.000075237534,0.000055221986,0.00021147303,0.0004720075,0.00006224301,0.018552434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998677,0.000044307835,0.000007759602,0.000025035646,0.000044113593,0.0000110888695],"domain_scores_gemma":[0.999882,0.00004356499,0.00003037138,0.000011100932,0.000028466315,0.0000045048846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017554527,0.00055654143,0.00035700586,0.0002405362,0.0002775889,0.0007863235,0.00053983124,0.00062873424,0.0030135263],"category_scores_gemma":[0.0003584322,0.0002229801,0.00031102772,0.0002655352,0.0004415075,0.0007906036,0.00037545167,0.0006334438,0.00078750495],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003022769,0.000013845805,0.0003416335,0.0000460074,0.000011941728,0.00009934169,0.000083515864,0.97720075,0.0032632817,0.012739922,0.00039810943,0.005771494],"study_design_scores_gemma":[0.000002839036,0.000014265206,0.00011226877,0.0000021045234,0.0000028667218,0.000012215196,0.0000062981903,0.9971746,0.00026714138,0.0018157775,0.0005861588,0.000003350326],"about_ca_topic_score_codex":0.007678127,"about_ca_topic_score_gemma":0.004250373,"teacher_disagreement_score":0.007678127,"about_ca_system_score_codex":0.0004055036,"about_ca_system_score_gemma":0.00041170893,"threshold_uncertainty_score":0.015266836},"labels":[],"label_agreement":null},{"id":"W2125028769","doi":"10.1109/pes.2006.1708970","title":"IED modelling for IEC61850 based substation automation system performance simulation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems and Technologies","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Automation; Network topology; Computer science; Software deployment; Construct (python library); Network simulation; Embedded system; Process automation system; Systems engineering; Computer network; Engineering; Software engineering","score_opus":0.008504227325915027,"score_gpt":0.18963013490322075,"score_spread":0.18112590757730573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125028769","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013162158,0.00013598948,0.95409954,0.00013928716,0.0000910454,0.00007290811,0.0005246891,0.0023149198,0.029459562],"genre_scores_gemma":[0.7131639,0.0010010601,0.25601253,0.0002069692,0.00007822501,0.00062444055,0.0026660003,0.0010452376,0.02520169],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946886,0.0001253636,0.00003202675,0.000049481958,0.00028526134,0.000039044986],"domain_scores_gemma":[0.99965155,0.000117572454,0.000037819405,0.000075470016,0.00010172584,0.000015861764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040757115,0.00068032416,0.0004631344,0.0006425995,0.00031364604,0.001162096,0.0010838226,0.0007578243,0.006290167],"category_scores_gemma":[0.0014813697,0.0003459301,0.0006597234,0.0005347596,0.0003426083,0.0012693832,0.00063216337,0.001097088,0.0018282727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027650476,0.000023442362,0.000518116,0.000051475145,0.000012840039,0.00007425396,0.000053641375,0.9597713,0.0027336874,0.020712491,0.0013502388,0.014670801],"study_design_scores_gemma":[0.0000071398595,0.00001214524,0.000102682236,0.000008014769,0.000006692224,0.000021704136,0.000006595373,0.98640037,0.0014148967,0.0031348495,0.008879773,0.0000051631105],"about_ca_topic_score_codex":0.0057736374,"about_ca_topic_score_gemma":0.0029879936,"teacher_disagreement_score":0.006290167,"about_ca_system_score_codex":0.00075641484,"about_ca_system_score_gemma":0.0007397809,"threshold_uncertainty_score":0.021042705},"labels":[],"label_agreement":null},{"id":"W2131718788","doi":"10.1109/pes.2006.1709375","title":"Asset health index method for diesel generation unit replacement planning","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Unit (ring theory); Reliability engineering; Index (typography); Asset management; Asset (computer security); Reliability (semiconductor); Unit cost; Computer science; Risk analysis (engineering); Operations management; Operations research; Engineering; Business; Finance","score_opus":0.01581970985303973,"score_gpt":0.2698358575390519,"score_spread":0.2540161476860122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131718788","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050991615,0.00018062456,0.9883188,0.000052979845,0.000029017217,0.0001621194,0.0007343874,0.0018445171,0.0035783506],"genre_scores_gemma":[0.1124954,0.0002116116,0.88157517,0.000032761403,0.000028890778,0.00058128824,0.0014863333,0.00024661975,0.0033419642],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99941146,0.00018460392,0.0000435835,0.00008721161,0.00024557312,0.000027592641],"domain_scores_gemma":[0.9988142,0.00068237865,0.00013247438,0.00009973007,0.00024275869,0.000028438952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011157597,0.0007722692,0.00062684744,0.0024348765,0.00030311872,0.0007734217,0.00092283677,0.00043936353,0.008400198],"category_scores_gemma":[0.003965742,0.00032661262,0.0005277482,0.0017427588,0.00019884024,0.0007032898,0.00050117663,0.0007999887,0.0016897202],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017819222,0.00012109648,0.0053969505,0.00023032643,0.00012734107,0.00016258025,0.00012030315,0.29009768,0.004340941,0.024372954,0.01103606,0.6638155],"study_design_scores_gemma":[0.000040689407,0.00009064349,0.0028476294,0.0000347273,0.00004569195,0.00017294358,0.000042091433,0.9587878,0.0053384267,0.015582789,0.016967952,0.000048596125],"about_ca_topic_score_codex":0.0037689211,"about_ca_topic_score_gemma":0.0036001892,"teacher_disagreement_score":0.008400198,"about_ca_system_score_codex":0.0005942094,"about_ca_system_score_gemma":0.00090015586,"threshold_uncertainty_score":0.028101504},"labels":[],"label_agreement":null},{"id":"W2133068933","doi":"10.1109/pes.2006.1709337","title":"Estimation of wind penetration as limited by frequency deviation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Penetration (warfare); Frequency deviation; Wind speed; Environmental science; Standard deviation; Thermal; Thermal power station; Meteorology; Control theory (sociology); Marine engineering; Computer science; Engineering; Electrical engineering; Physics; Mathematics; Automatic frequency control; Statistics","score_opus":0.002946868158427234,"score_gpt":0.18121158747135563,"score_spread":0.1782647193129284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133068933","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8421501,0.00023143171,0.15269561,0.00004569019,0.000014040089,0.000026095702,0.0004666864,0.0003979186,0.003972441],"genre_scores_gemma":[0.9912579,0.000062299405,0.008264673,0.000005223733,0.0000055161095,0.000008521944,0.00019748852,0.000013546734,0.00018478766],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997186,0.000051114992,0.00001825905,0.00005775259,0.000119436074,0.000034843702],"domain_scores_gemma":[0.9989367,0.00053517753,0.00018058482,0.00009934793,0.00020020473,0.000048086815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032549293,0.00040910408,0.00029532207,0.0010736857,0.00010007574,0.00032221986,0.0001799765,0.00032781926,0.000745911],"category_scores_gemma":[0.0026578333,0.00018240609,0.00014047958,0.00067533774,0.00014125636,0.00058655685,0.00022928428,0.0002186163,0.0002565408],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011836177,0.00018970447,0.20868221,0.00032111193,0.00024373803,0.00091110443,0.00051690335,0.23376247,0.20763,0.0031419299,0.0015704219,0.34184688],"study_design_scores_gemma":[0.000024143743,0.0006053685,0.27785927,0.00006200209,0.00007758944,0.0014148217,0.00014336631,0.66482145,0.051207516,0.001949198,0.0017317068,0.00010365074],"about_ca_topic_score_codex":0.0007114531,"about_ca_topic_score_gemma":0.00086678006,"teacher_disagreement_score":0.0010736857,"about_ca_system_score_codex":0.000122255,"about_ca_system_score_gemma":0.00008292813,"threshold_uncertainty_score":0.0024953485},"labels":[],"label_agreement":null},{"id":"W2134021005","doi":"10.1109/pes.2006.1708961","title":"Deriving asset probabilities of failure: effect of condition and maintenance levels","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kinectrics (Canada)","funders":"","keywords":"Asset (computer security); Risk analysis (engineering); Actuarial science; Life expectancy; Expectancy theory; Computer science; Focus (optics); Reliability engineering; Business; Economics; Engineering; Computer security","score_opus":0.0024247046734488854,"score_gpt":0.17916500210146924,"score_spread":0.17674029742802036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134021005","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30335924,0.00058279943,0.68923,0.0002271856,0.0000355146,0.000079547906,0.0005400206,0.00038989144,0.005555744],"genre_scores_gemma":[0.9598435,0.0004441086,0.038561992,0.000039541654,0.000023706796,0.00004275203,0.00036389907,0.000069243266,0.0006112029],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988337,0.0003931247,0.000057292797,0.00018025977,0.000429304,0.00010641931],"domain_scores_gemma":[0.97497296,0.022011565,0.0013736908,0.000900617,0.00060301716,0.0001381733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024627564,0.00084434834,0.00065832277,0.0011378748,0.00020931214,0.0010842754,0.00074088044,0.0008466899,0.0014655147],"category_scores_gemma":[0.02330271,0.0005041319,0.0008317033,0.0006784442,0.00071020727,0.0019378323,0.0009582923,0.0012788349,0.00034512667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067622,0.000059279035,0.011573147,0.000064941574,0.000068359026,0.00010912455,0.000080999336,0.9423954,0.0024104377,0.008179274,0.0002264294,0.034764998],"study_design_scores_gemma":[0.000010063247,0.00013194418,0.008871618,0.000022167125,0.00006867333,0.00017114983,0.000027850298,0.96327466,0.006583722,0.020183409,0.0006114971,0.000043231343],"about_ca_topic_score_codex":0.0024571118,"about_ca_topic_score_gemma":0.001707682,"teacher_disagreement_score":0.0024627564,"about_ca_system_score_codex":0.0005050867,"about_ca_system_score_gemma":0.0005495939,"threshold_uncertainty_score":0.013024449},"labels":[],"label_agreement":null},{"id":"W2138170029","doi":"10.1109/pes.2006.1709366","title":"Probabilistic reliability evaluation for interconnecting the power systems in North East Asia","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Interconnection; Reliability engineering; Probabilistic logic; East Asia; Computer science; Generator (circuit theory); Line (geometry); Electric power system; Power (physics); Tie line; Engineering; Telecommunications; Geography; China; Mathematics; Artificial intelligence","score_opus":0.009714966767452534,"score_gpt":0.21018121031362474,"score_spread":0.2004662435461722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138170029","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76606375,0.00047049823,0.22584634,0.00020357141,0.000010398755,0.000049778257,0.00020806574,0.00015209979,0.0069955233],"genre_scores_gemma":[0.99191827,0.00017642409,0.0071394504,0.0000068994336,0.0000032328517,0.000020302055,0.00009282685,0.000012957565,0.00062965485],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991742,0.0005172148,0.000021005713,0.000058405156,0.00017906951,0.000050140097],"domain_scores_gemma":[0.9987206,0.0008443601,0.0001440304,0.00009568524,0.00017571419,0.000019605972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015652961,0.00050524535,0.00044340885,0.0006615527,0.0002042419,0.000507005,0.0006019848,0.00043081533,0.0011169225],"category_scores_gemma":[0.004280677,0.00029290194,0.00052867184,0.0007393869,0.00047299822,0.00072559324,0.00047633855,0.0004301202,0.00009076119],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001797232,0.000005006908,0.0007979703,0.000013527989,0.000013195297,0.00006837836,0.00002460682,0.9940468,0.00048436932,0.002019617,0.0000539953,0.0024544757],"study_design_scores_gemma":[0.0000055722994,0.00005330969,0.00087979285,0.000004055968,0.000014222188,0.00005917582,0.000030085926,0.9957104,0.00058105186,0.0024476477,0.00021016637,0.0000046605705],"about_ca_topic_score_codex":0.005054473,"about_ca_topic_score_gemma":0.0040765735,"teacher_disagreement_score":0.005054473,"about_ca_system_score_codex":0.00066099275,"about_ca_system_score_gemma":0.0006025227,"threshold_uncertainty_score":0.010050118},"labels":[],"label_agreement":null},{"id":"W2139713739","doi":"10.1109/pes.2006.1708982","title":"An on-line measurement of symmetrical components utilizing the energy operator","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Operator (biology); Energy operator; Energy (signal processing); Measure (data warehouse); Simple (philosophy); Line (geometry); Computer science; Amplitude; Algorithm; Power (physics); Mathematics; Optics; Physics; Geometry; Data mining","score_opus":0.03308735031955894,"score_gpt":0.23789047051844694,"score_spread":0.204803120198888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139713739","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009306633,0.000103497434,0.98778313,0.000026750315,0.00008449753,0.000052968353,0.000051336734,0.00045956526,0.0021315855],"genre_scores_gemma":[0.29031974,0.00035761218,0.7049214,0.00011552503,0.000111689136,0.00011009964,0.0002011254,0.00014118345,0.0037216297],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99878067,0.00024215192,0.000037018195,0.00015813201,0.0007439215,0.000038064954],"domain_scores_gemma":[0.99936956,0.00018681168,0.00009290908,0.00011438839,0.00020708719,0.000029280956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062271283,0.00063307805,0.00054816355,0.0014044452,0.00026111412,0.0007677056,0.00091275806,0.0006189163,0.0030403],"category_scores_gemma":[0.0014797893,0.0002106391,0.00022298457,0.0009137061,0.00048323788,0.0014544603,0.00061199296,0.000574601,0.00094207545],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002741097,0.00015880405,0.0022774688,0.0003330601,0.000052517953,0.0001686914,0.00017338853,0.003799885,0.42950776,0.014462756,0.0024411057,0.5463505],"study_design_scores_gemma":[0.00012321677,0.0014149464,0.008902633,0.000109588866,0.000114894145,0.003568612,0.00022476527,0.27590382,0.65625876,0.010217567,0.042932544,0.00022859586],"about_ca_topic_score_codex":0.00022379715,"about_ca_topic_score_gemma":0.00046784084,"teacher_disagreement_score":0.0030403,"about_ca_system_score_codex":0.00016052315,"about_ca_system_score_gemma":0.00029546855,"threshold_uncertainty_score":0.010170877},"labels":[],"label_agreement":null},{"id":"W2141416484","doi":"10.1109/pes.2006.1709613","title":"Mitigation of subsynchronous oscillations in a series compensated wind farm with static var compensator","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Control theory (sociology); Induction generator; Static VAR compensator; Controller (irrigation); Wind power; Electric power system; Engineering; Doubly fed electric machine; Generator (circuit theory); Series (stratigraphy); Electric power transmission; AC power; Voltage; Control engineering; Power (physics); Computer science; Physics; Control (management); Electrical engineering","score_opus":0.003445315783212685,"score_gpt":0.17574201516243018,"score_spread":0.1722966993792175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141416484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8072928,0.00016988335,0.18726219,0.000087775654,0.00003710238,0.000040411836,0.000038350146,0.00078509375,0.0042864117],"genre_scores_gemma":[0.99510324,0.000041750598,0.004204873,0.000010172677,0.000007072745,0.0000081826265,0.000018450088,0.000008378372,0.0005979305],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999168,0.000023921313,0.000005553781,0.000013084219,0.000029985857,0.000010582522],"domain_scores_gemma":[0.99983895,0.000039474133,0.000055270342,0.000017711971,0.000036742116,0.000011850973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015797837,0.00035546016,0.00027226674,0.0002293035,0.00014490631,0.0001873376,0.0002692688,0.00024267018,0.00078244944],"category_scores_gemma":[0.00036816928,0.00011016507,0.0001281451,0.00016549315,0.00014422287,0.00018533738,0.00014453854,0.0001713742,0.00012877765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008697749,0.00034900577,0.005034685,0.000209875,0.00014401431,0.0006571958,0.00011131282,0.48924828,0.34951484,0.0033224376,0.0011996914,0.14933895],"study_design_scores_gemma":[0.00016072155,0.002101123,0.005731819,0.000015366675,0.00011205534,0.00023059854,0.000042745134,0.939732,0.04839996,0.0017648689,0.0016933379,0.000015314303],"about_ca_topic_score_codex":0.0006498385,"about_ca_topic_score_gemma":0.001346179,"teacher_disagreement_score":0.00078244944,"about_ca_system_score_codex":0.000103603175,"about_ca_system_score_gemma":0.00015144891,"threshold_uncertainty_score":0.0026175976},"labels":[],"label_agreement":null},{"id":"W2142817240","doi":"10.1109/pes.2006.1709170","title":"Localization of partial discharges using UHF sensors in power transformers","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"High voltage insulation and dielectric phenomena","field":"Materials Science","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Ultra high frequency; Partial discharge; Transformer; Electrical engineering; MATLAB; Electronic circuit; Electronic engineering; Computer science; Materials science; Engineering; Voltage","score_opus":0.007092785983164527,"score_gpt":0.2172241390840255,"score_spread":0.21013135310086095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142817240","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4598124,0.000757387,0.535687,0.00022667383,0.000037819576,0.000029246816,0.000046060566,0.00147952,0.0019237613],"genre_scores_gemma":[0.97365403,0.00014259646,0.025839766,0.000014241318,0.000007790957,0.000008408255,0.00001317192,0.000010859423,0.00030924866],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998807,0.000031743228,0.000004742425,0.000022066792,0.000052453754,0.000008341738],"domain_scores_gemma":[0.9998233,0.00007270705,0.000040555966,0.00001868164,0.000032639917,0.000012150637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019811072,0.0002648538,0.0003205885,0.00033306022,0.00014038691,0.00031528898,0.00030993132,0.0004484376,0.00031966346],"category_scores_gemma":[0.0006900787,0.00018343162,0.00016260968,0.00021892942,0.00031289968,0.00051752914,0.00018732707,0.00018096373,0.00008181838],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050086575,0.00008472572,0.008952739,0.0002424699,0.00004320673,0.0007252191,0.00045367476,0.21340844,0.56168133,0.0027379012,0.0010008205,0.21016878],"study_design_scores_gemma":[0.000050309907,0.00027020674,0.006130755,0.000018077328,0.000022056816,0.0007602602,0.0000755922,0.80575466,0.18333967,0.0017321198,0.0018092901,0.000037004997],"about_ca_topic_score_codex":0.0009990594,"about_ca_topic_score_gemma":0.0006828861,"teacher_disagreement_score":0.0009990594,"about_ca_system_score_codex":0.00033788843,"about_ca_system_score_gemma":0.00013016345,"threshold_uncertainty_score":0.002451539},"labels":[],"label_agreement":null},{"id":"W2143713801","doi":"10.1109/pes.2006.1708976","title":"Supply adequacy mechanisms and cross-border contracts in the Central American regional electricity market","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Business; Electricity market; Industrial organization; Mains electricity; Electricity; Engineering","score_opus":0.003028271181776102,"score_gpt":0.22466657109957616,"score_spread":0.22163829991780007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143713801","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7217697,0.0018951327,0.09720854,0.0066108666,0.00012939783,0.00010742895,0.00008490131,0.00026205333,0.17193206],"genre_scores_gemma":[0.9931967,0.00020638158,0.0038947547,0.00016885033,0.000027705502,0.000017351422,0.000010636492,0.000012008393,0.002465636],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976306,0.0012118442,0.00010676791,0.0001837613,0.0005347608,0.00033215425],"domain_scores_gemma":[0.99431723,0.0028596253,0.0010649936,0.0005715398,0.0008900323,0.00029656186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058523933,0.000182636,0.0003177235,0.000687899,0.0014370552,0.0033124147,0.0010648672,0.0014513396,0.0054211863],"category_scores_gemma":[0.010236903,0.00027820596,0.00033303516,0.00077351386,0.0027354704,0.0031624609,0.001415107,0.001633002,0.00021212106],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006971542,0.000045718396,0.0022962014,0.00003171838,0.000025238178,0.00029851228,0.000603552,0.01961016,0.001009872,0.95977193,0.0014562473,0.014781069],"study_design_scores_gemma":[0.0005119848,0.0003632282,0.023800818,0.00031780917,0.00013708699,0.0008065921,0.0034049791,0.13216515,0.0042160475,0.74260324,0.09150016,0.0001729798],"about_ca_topic_score_codex":0.008415687,"about_ca_topic_score_gemma":0.008926106,"teacher_disagreement_score":0.008415687,"about_ca_system_score_codex":0.0016253741,"about_ca_system_score_gemma":0.0024231304,"threshold_uncertainty_score":0.030950725},"labels":[],"label_agreement":null},{"id":"W2144471231","doi":"10.1109/pes.2006.1709464","title":"New tools for power system dynamic performance management","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electric power system; Mathematical optimization; Probabilistic logic; Computer science; Maximization; Profit maximization; Pareto principle; Power flow; Control theory (sociology); Stability (learning theory); Optimal control; System dynamics; Power (physics); Profit (economics); Mathematics; Control (management)","score_opus":0.004516706857200771,"score_gpt":0.18450443775064312,"score_spread":0.17998773089344236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144471231","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00091576145,0.0026410616,0.979364,0.0005728181,0.00022556547,0.000034559307,0.00010891023,0.00060212315,0.015535212],"genre_scores_gemma":[0.20312524,0.014306307,0.75236034,0.0006001354,0.0022474173,0.0007981113,0.0005101221,0.0008203856,0.025231985],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99845254,0.00040014225,0.00009154034,0.00022100547,0.00075898186,0.00007575222],"domain_scores_gemma":[0.9985921,0.00073323405,0.0001925699,0.00022913695,0.00020491396,0.000048064358],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001914745,0.0021120594,0.0014175484,0.0021739833,0.0005695525,0.0030389386,0.00149128,0.0011087275,0.009104749],"category_scores_gemma":[0.005868359,0.0006249546,0.00087424566,0.002633671,0.0017524025,0.004794307,0.0022342263,0.0038362886,0.0029240462],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016409143,0.00004763301,0.00014937812,0.00017789473,0.000029663914,0.000068197565,0.00014858616,0.123134114,0.001278749,0.690959,0.0078043477,0.17618616],"study_design_scores_gemma":[0.000016139562,0.000040603816,0.00016347365,0.00013107935,0.00001655552,0.00009800766,0.00005461371,0.4106846,0.0009195003,0.5057499,0.08208151,0.000044109038],"about_ca_topic_score_codex":0.0009915744,"about_ca_topic_score_gemma":0.00081238523,"teacher_disagreement_score":0.009104749,"about_ca_system_score_codex":0.0013032033,"about_ca_system_score_gemma":0.00071821455,"threshold_uncertainty_score":0.03045845},"labels":[],"label_agreement":null},{"id":"W2150153334","doi":"10.1109/pes.2006.1709541","title":"A three-level converter based micro-turbine distributed generation system","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Multilevel Inverters and Converters","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Turbine; Buck–boost converter; Ćuk converter; Boost converter; Generator (circuit theory); Controller (irrigation); Computer science; Voltage; Power (physics); Electronic engineering; Engineering; Electrical engineering; Mechanical engineering","score_opus":0.01194886974725367,"score_gpt":0.18403560335342142,"score_spread":0.17208673360616775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150153334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14173132,0.00054503797,0.8217822,0.00042278747,0.00020236504,0.00027658464,0.00038129024,0.004261593,0.030396855],"genre_scores_gemma":[0.92160356,0.0002643425,0.06938981,0.000108957596,0.000041250547,0.00012830093,0.00023305172,0.000033836575,0.008196918],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999033,0.000015839241,0.000005548031,0.000022179283,0.00004612211,0.000006967702],"domain_scores_gemma":[0.9999392,0.000010630634,0.000008313683,0.000011875017,0.000017275888,0.000012650669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006640734,0.00020182611,0.0003568946,0.00012860536,0.00027841213,0.00063575874,0.000639313,0.0002663514,0.0031853772],"category_scores_gemma":[0.00011583039,0.00013749616,0.00018647451,0.0002954995,0.0001952118,0.00039589865,0.0002013262,0.0005329118,0.0009826238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045309917,0.00051024073,0.0044750194,0.000635006,0.00014934943,0.0021833049,0.00026284988,0.31588113,0.26742047,0.059989475,0.014029229,0.3340108],"study_design_scores_gemma":[0.00017372472,0.0005553723,0.0025516334,0.000026464366,0.00006506718,0.001140056,0.000046014826,0.9260656,0.032933746,0.0075397263,0.028860185,0.000042437037],"about_ca_topic_score_codex":0.0010124047,"about_ca_topic_score_gemma":0.001709007,"teacher_disagreement_score":0.0031853772,"about_ca_system_score_codex":0.00030671086,"about_ca_system_score_gemma":0.00039576474,"threshold_uncertainty_score":0.010656178},"labels":[],"label_agreement":null},{"id":"W2151330222","doi":"10.1109/pes.2006.1709576","title":"Optimal tracking secondary voltage control for the DFIG wind turbines","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Control theory (sociology); Wind power; AC power; Voltage regulation; Induction generator; Voltage; Voltage optimisation; Voltage droop; Compensation (psychology); Engineering; Margin (machine learning); Electric power system; Voltage controller; Voltage regulator; Computer science; Power (physics); Control (management); Electrical engineering; Physics","score_opus":0.004863451207413039,"score_gpt":0.18617883945140806,"score_spread":0.181315388243995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151330222","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.117255986,0.00021888956,0.875994,0.00009718855,0.000077996214,0.000059211747,0.000038223563,0.00057703065,0.005681396],"genre_scores_gemma":[0.98817134,0.000034223573,0.011190379,0.000014613774,0.000010367066,0.000014897144,0.000017881926,0.00000901013,0.0005373221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998479,0.000024742349,0.000009279726,0.000033060332,0.00006571466,0.000019276125],"domain_scores_gemma":[0.9997466,0.000054095304,0.000062426705,0.000016263964,0.000106127416,0.000014464821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002287046,0.00030642326,0.00025990553,0.00018027588,0.00025207375,0.0005375512,0.00026785056,0.0002213421,0.00076895254],"category_scores_gemma":[0.00052277016,0.000093874,0.00013118732,0.0001725337,0.00023203215,0.00021817091,0.00015009308,0.00031340003,0.00012671867],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050955545,0.00015349801,0.0018522125,0.00019543475,0.00003980424,0.00023388761,0.00016081179,0.60046816,0.09270315,0.013138154,0.0020862147,0.28845915],"study_design_scores_gemma":[0.000035940095,0.00017538496,0.0005894066,0.000007069753,0.000008243619,0.00003358283,0.00000857747,0.9885542,0.0071357256,0.0022545166,0.0011919269,0.0000054118796],"about_ca_topic_score_codex":0.0015940024,"about_ca_topic_score_gemma":0.002320122,"teacher_disagreement_score":0.0015940024,"about_ca_system_score_codex":0.0002760555,"about_ca_system_score_gemma":0.00035373625,"threshold_uncertainty_score":0.003169477},"labels":[],"label_agreement":null},{"id":"W2152776332","doi":"10.1109/pes.2006.1708892","title":"A wavelet power based algorithm for synchronous generator protection","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Emtp; Wavelet; Permanent magnet synchronous generator; Discrete wavelet transform; Computer science; Computation; Wavelet transform; Generator (circuit theory); Algorithm; Electric power system; Electronic engineering; Power (physics); Three-phase; Control theory (sociology); Voltage; Engineering; Electrical engineering; Artificial intelligence; Physics","score_opus":0.004783274471662943,"score_gpt":0.1885533340621458,"score_spread":0.18377005959048287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152776332","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014228021,0.00005893221,0.99781054,0.00002203909,0.000030660725,0.000016959386,0.000009415754,0.00017588958,0.00045279946],"genre_scores_gemma":[0.05725263,0.00029810317,0.93866605,0.00004487514,0.000069299334,0.000107884305,0.00014586309,0.000116410476,0.0032987122],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964607,0.000059397313,0.000023531637,0.00008439637,0.00016400234,0.000022694472],"domain_scores_gemma":[0.9997484,0.0000700641,0.000023219749,0.000044710563,0.00010229023,0.000011292598],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053306064,0.0006976699,0.00050877983,0.00082165125,0.00028319942,0.0006892728,0.0007692193,0.0007692094,0.0038507862],"category_scores_gemma":[0.0014230432,0.000251999,0.00037677938,0.0008748269,0.00035119997,0.0012355754,0.0005347074,0.00100675,0.002032356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001666619,0.000053976142,0.00024531613,0.00011869185,0.00003138352,0.00009091521,0.000082430175,0.064862795,0.032895826,0.03487674,0.0032323203,0.86334294],"study_design_scores_gemma":[0.000053460088,0.00014282287,0.00031498572,0.000018905757,0.00001771598,0.00023887667,0.000019798557,0.9544127,0.016705906,0.01373731,0.014319651,0.000017861397],"about_ca_topic_score_codex":0.00044939958,"about_ca_topic_score_gemma":0.00032812127,"teacher_disagreement_score":0.0038507862,"about_ca_system_score_codex":0.0002748962,"about_ca_system_score_gemma":0.0003497237,"threshold_uncertainty_score":0.012882173},"labels":[],"label_agreement":null},{"id":"W2152928485","doi":"10.1109/pes.2006.1709602","title":"An analysis of the impacts of wind generation on the Ontario electricity system","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wind power; Electricity; Electricity system; Environmental science; Electricity generation; Environmental economics; Meteorology; Environmental resource management; Engineering; Geography; Electrical engineering; Economics; Power (physics)","score_opus":0.004237542603861819,"score_gpt":0.17516716203435037,"score_spread":0.17092961943048857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152928485","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9562095,0.0002857282,0.0014936889,0.0006380714,0.0000202061,0.00009207543,0.0016678041,0.000043840577,0.039549086],"genre_scores_gemma":[0.98924214,0.00045187314,0.00075153814,0.000046018064,0.000008571219,0.000020777088,0.00085240137,0.000014862683,0.00861179],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996177,0.00005594174,0.000006780642,0.00001775804,0.00018712967,0.0001146547],"domain_scores_gemma":[0.99953544,0.000113352515,0.000036407462,0.000013992316,0.00025798014,0.000042800235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024217255,0.00039499844,0.00031708225,0.00051145704,0.0012532591,0.0008215984,0.0004576432,0.00031988477,0.0027615277],"category_scores_gemma":[0.0012176,0.00022809744,0.00051339023,0.0013619337,0.00043762237,0.0003334806,0.00028801244,0.00043606223,0.00012259226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000525921,0.00011196298,0.06693941,0.00023250101,0.00018548338,0.0017182791,0.000664163,0.88200665,0.0052077034,0.01161475,0.009350978,0.021442223],"study_design_scores_gemma":[0.00017719653,0.00030775173,0.39223036,0.000059687056,0.0002903117,0.0002016771,0.0036305704,0.5741944,0.002863191,0.0041311127,0.021806834,0.000106967746],"about_ca_topic_score_codex":0.9762412,"about_ca_topic_score_gemma":0.98633724,"teacher_disagreement_score":0.023758829,"about_ca_system_score_codex":0.01870584,"about_ca_system_score_gemma":0.01322932,"threshold_uncertainty_score":0.13572097},"labels":[],"label_agreement":null},{"id":"W2154980236","doi":"10.1109/pes.2006.1708944","title":"The hybrid power flow controller - a new concept for flexible AC transmission","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Converters; Shunt (medical); Network topology; Topology (electrical circuits); AC power; Control theory (sociology); Computer science; Voltage source; Voltage; Electronic engineering; Engineering; Electrical engineering","score_opus":0.0047579565627390834,"score_gpt":0.19483519157126852,"score_spread":0.19007723500852944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154980236","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012679177,0.0007398491,0.9667485,0.0002015724,0.00027384656,0.0000621866,0.000065444096,0.0007701267,0.018459303],"genre_scores_gemma":[0.6636618,0.0013692612,0.31400976,0.00039993814,0.0006211666,0.00030489068,0.00017526357,0.00013310228,0.0193249],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99981505,0.000028323331,0.000009998563,0.000045323184,0.00008666807,0.000014637921],"domain_scores_gemma":[0.99983895,0.00004748887,0.000021122656,0.000042337328,0.000033411226,0.000016742446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025421142,0.0003238425,0.0002934036,0.00048848276,0.00026382526,0.0011953384,0.0008284888,0.00056374224,0.0041963756],"category_scores_gemma":[0.00037604434,0.00016078512,0.00022048103,0.00039919274,0.00058278866,0.0016975196,0.00039180752,0.0010904726,0.00058715336],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023658352,0.00014590452,0.00044674892,0.00025807385,0.00007830088,0.00062300434,0.00021012303,0.050543968,0.070892215,0.49947342,0.006625159,0.37046656],"study_design_scores_gemma":[0.00014337937,0.00056286785,0.0004987765,0.00009229676,0.00006175073,0.0019857401,0.00006513171,0.6332869,0.030457739,0.18043825,0.15233932,0.00006789913],"about_ca_topic_score_codex":0.00019316933,"about_ca_topic_score_gemma":0.00018713783,"teacher_disagreement_score":0.0041963756,"about_ca_system_score_codex":0.00021704202,"about_ca_system_score_gemma":0.0002230456,"threshold_uncertainty_score":0.014038265},"labels":[],"label_agreement":null},{"id":"W2157567496","doi":"10.1109/pes.2006.1709233","title":"Performance evaluation of a building integrated photovoltaic array using an Internet based monitoring system","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Photovoltaic System Optimization Techniques","field":"Energy","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro; University of Manitoba","funders":"Manitoba Hydro","keywords":"Photovoltaic system; The Internet; Interrogation; Computer science; Environmental science; Remote sensing; Real-time computing; Electrical engineering; Engineering; World Wide Web; Geography","score_opus":0.01904488915504827,"score_gpt":0.25139648846500245,"score_spread":0.2323515993099542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157567496","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98058015,0.00012276144,0.016827583,0.00004938421,0.000012853054,0.000024821333,0.00006804539,0.00048290886,0.0018315226],"genre_scores_gemma":[0.99732983,0.0000381633,0.0020712304,0.000010214729,0.0000048852144,0.000008317444,0.000061280545,0.00001075568,0.00046536425],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99963844,0.000104043815,0.000015713555,0.00006701072,0.00014513794,0.000029594767],"domain_scores_gemma":[0.9995053,0.00016356971,0.00006320745,0.00005213638,0.00018798232,0.000027842925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003836846,0.0003153578,0.00035650557,0.00029596023,0.00022196892,0.00046801454,0.00037367106,0.0004118055,0.0009858782],"category_scores_gemma":[0.0009050192,0.00013527341,0.00014926586,0.00039358102,0.00014854867,0.00037195272,0.00018251865,0.0001769566,0.00026155866],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003878274,0.0010631665,0.055088274,0.00032373815,0.00038615667,0.00046186254,0.00021789396,0.33947197,0.38960576,0.0005359843,0.0012137176,0.20775315],"study_design_scores_gemma":[0.00016308649,0.005199936,0.04915364,0.000017870896,0.00025708665,0.0004678287,0.00010493906,0.75069284,0.1921947,0.00019020087,0.0015102819,0.000047659265],"about_ca_topic_score_codex":0.0014736566,"about_ca_topic_score_gemma":0.0013657666,"teacher_disagreement_score":0.0014736566,"about_ca_system_score_codex":0.00032759525,"about_ca_system_score_gemma":0.00016262705,"threshold_uncertainty_score":0.0032981038},"labels":[],"label_agreement":null},{"id":"W2158458616","doi":"10.1109/pes.2006.1709098","title":"Incorporating dynamic security into market dispatch using accurate transient stability constraints","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"University of Manitoba","keywords":"Computer science; Transient (computer programming); Constraint (computer-aided design); Electric power system; Mathematical optimization; Stability (learning theory); Electricity market; Linear programming; Computation; Key (lock); Control theory (sociology); Electricity; Power (physics); Algorithm; Engineering; Mathematics; Artificial intelligence","score_opus":0.005929969658417431,"score_gpt":0.2083649508485184,"score_spread":0.20243498119010095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158458616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012677839,0.000029040943,0.9861223,0.000046786176,0.000009279485,0.000013218197,0.000024754403,0.00014726691,0.0009295473],"genre_scores_gemma":[0.7888027,0.00014474797,0.20934503,0.00003151128,0.000035740002,0.00008775617,0.00018750655,0.00019882795,0.0011661632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935037,0.00018440155,0.000037436697,0.00006439344,0.00031657284,0.000046845522],"domain_scores_gemma":[0.9984243,0.00093355094,0.00018025101,0.00014990594,0.00027510512,0.000036985402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009689849,0.00068361865,0.0007546368,0.00050624035,0.00031675384,0.001282049,0.00073155004,0.0005636573,0.0019815238],"category_scores_gemma":[0.0055439123,0.0004900432,0.00035856394,0.0005572551,0.00042812582,0.0027345796,0.000878388,0.0009719076,0.00041592296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033309243,0.000021051177,0.000290788,0.000021525333,0.000009935179,0.000034175206,0.000028353374,0.9600867,0.002696673,0.010426969,0.00029412736,0.026056284],"study_design_scores_gemma":[0.0000025486238,0.000007677491,0.000040931922,0.000001847035,0.0000010657052,0.000005289833,0.0000022259892,0.997519,0.00062671996,0.0015473695,0.00024230752,0.0000030204615],"about_ca_topic_score_codex":0.0018615174,"about_ca_topic_score_gemma":0.0017696796,"teacher_disagreement_score":0.0019815238,"about_ca_system_score_codex":0.00045849686,"about_ca_system_score_gemma":0.0007168316,"threshold_uncertainty_score":0.006628871},"labels":[],"label_agreement":null},{"id":"W2159630438","doi":"10.1109/pes.2006.1709391","title":"Test feeder analysis with two large induction generators using initialization and time-domain simulation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Emtp; Initialization; Waveform; Fault (geology); Computer science; Time domain; Induction generator; Wind power; Engineering; Electric power system; Voltage; Power (physics); Electrical engineering","score_opus":0.004673650052142399,"score_gpt":0.20922334609151105,"score_spread":0.20454969603936865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159630438","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7422175,0.00010564398,0.22798182,0.0002119957,0.000039943665,0.0001963836,0.00059044117,0.0022412222,0.026415125],"genre_scores_gemma":[0.9798814,0.000030044259,0.018392202,0.00001459521,0.000004100644,0.00004422006,0.0002281399,0.000063761116,0.0013414563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99986315,0.000057263802,0.0000072748817,0.000013121652,0.00003810261,0.000021056914],"domain_scores_gemma":[0.9993167,0.00038881853,0.0000505624,0.000087672306,0.00012003034,0.00003625724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029880446,0.0006712529,0.00043386116,0.0003935287,0.00032760148,0.00048287617,0.00083739957,0.0006496369,0.0036192362],"category_scores_gemma":[0.00089526706,0.00019546696,0.00030071495,0.0004004975,0.00026763306,0.0005187985,0.00025820918,0.0005282548,0.00030694724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023476189,0.00015069029,0.0015236724,0.00007200988,0.00002368945,0.00026822463,0.000078601945,0.9762917,0.0061675226,0.0030457308,0.0009057336,0.011237615],"study_design_scores_gemma":[0.000028603086,0.000071267226,0.00035782036,0.0000029131993,0.0000052226833,0.000020835221,0.000012983901,0.9966955,0.002205037,0.00028626708,0.00030964543,0.0000038650937],"about_ca_topic_score_codex":0.0069361906,"about_ca_topic_score_gemma":0.003931215,"teacher_disagreement_score":0.0069361906,"about_ca_system_score_codex":0.0005994613,"about_ca_system_score_gemma":0.00039973654,"threshold_uncertainty_score":0.013791621},"labels":[],"label_agreement":null},{"id":"W2159893886","doi":"10.1109/pes.2006.1709474","title":"Forecasting the hourly Ontario energy price by multivariate adaptive regression splines","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Multivariate adaptive regression splines; Electricity price forecasting; Mars Exploration Program; Econometrics; Multivariate statistics; Probabilistic forecasting; Computer science; Variable (mathematics); Regression analysis; Cross-sectional regression; Regression; Variable renewable energy; Demand forecasting; Electricity; Electricity market; Nonparametric regression; Bayesian multivariate linear regression; Economics; Statistics; Engineering; Operations research; Machine learning; Artificial intelligence; Mathematics; Electric power system","score_opus":0.00925709688761082,"score_gpt":0.18511990225364908,"score_spread":0.17586280536603827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159893886","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49940723,0.00024865606,0.49339116,0.0004358805,0.000059877555,0.000050803854,0.0013526664,0.0011115631,0.0039421325],"genre_scores_gemma":[0.95596945,0.00016993501,0.041289266,0.000011917198,0.000023069375,0.000028703293,0.0008028547,0.000040636438,0.0016642963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968636,0.00010558498,0.000011436994,0.00004170779,0.00012341568,0.000031439035],"domain_scores_gemma":[0.9992243,0.00038132034,0.00012406794,0.000059971142,0.00018419797,0.000026127665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093420834,0.0003200855,0.00039347186,0.0005699348,0.00021710308,0.0004750168,0.0005839171,0.00037812785,0.0011010902],"category_scores_gemma":[0.003681124,0.00025036477,0.00054417254,0.0012942719,0.00023589996,0.0004621582,0.00028828962,0.0006322351,0.00023559047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000744461,0.000017293984,0.0071446793,0.000017617242,0.000030727944,0.000031402382,0.000033603555,0.95972896,0.000952474,0.0017778561,0.00096314563,0.029227829],"study_design_scores_gemma":[0.0000019620372,0.000004111581,0.0013757292,7.3880005e-7,0.0000015294298,0.0000021779042,0.0000029701268,0.9980907,0.00009440561,0.0002591579,0.00016339104,0.0000031245718],"about_ca_topic_score_codex":0.09908082,"about_ca_topic_score_gemma":0.11803823,"teacher_disagreement_score":0.9009192,"about_ca_system_score_codex":0.0006297286,"about_ca_system_score_gemma":0.0011164742,"threshold_uncertainty_score":0.19700825},"labels":[],"label_agreement":null},{"id":"W2161359458","doi":"10.1109/pes.2006.1709108","title":"Digital implementation and transient simulation of space-vector modulated converters","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Multilevel Inverters and Converters","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Converters; Transient (computer programming); Power electronics; Electronic engineering; Pulse-width modulation; Voltage source; Harmonic analysis; Harmonic; Computer science; Modulation (music); Power (physics); Voltage; Nonlinear system; Degrees of freedom (physics and chemistry); Space vector modulation; Electrical engineering; Topology (electrical circuits); Engineering; Physics","score_opus":0.004937503487411182,"score_gpt":0.20147748140416877,"score_spread":0.1965399779167576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161359458","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41096553,0.00024518897,0.53576326,0.00045340095,0.00012443923,0.00017948567,0.0006136694,0.0027405317,0.04891448],"genre_scores_gemma":[0.96589583,0.00009811643,0.030591968,0.000022982062,0.0000073426786,0.00013201045,0.00013470105,0.000047427544,0.0030695896],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998857,0.000033214983,0.0000070590213,0.000011022045,0.000046890822,0.000016147662],"domain_scores_gemma":[0.9997391,0.0001401625,0.000020628378,0.00003862878,0.00004997691,0.000011484904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021542933,0.0002943728,0.0003866264,0.00025419638,0.00029552824,0.000603192,0.00059557875,0.00074880786,0.003589826],"category_scores_gemma":[0.0006631296,0.00015034991,0.00027350124,0.00032723063,0.0003831559,0.0003928952,0.00027721413,0.00049400225,0.00031669615],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010594937,0.000059350597,0.00063337735,0.000070439986,0.000011366518,0.00012678171,0.00010601912,0.97414434,0.0054928167,0.009151509,0.00045721073,0.009640842],"study_design_scores_gemma":[0.000011497429,0.000018420298,0.00007181612,0.0000028293923,0.0000021355174,0.000008243104,0.000009484715,0.9972566,0.00170415,0.0004301339,0.00048270135,0.0000020983673],"about_ca_topic_score_codex":0.0030996585,"about_ca_topic_score_gemma":0.0015472958,"teacher_disagreement_score":0.003589826,"about_ca_system_score_codex":0.00042280243,"about_ca_system_score_gemma":0.00032577233,"threshold_uncertainty_score":0.012009203},"labels":[],"label_agreement":null},{"id":"W2161377480","doi":"10.1109/pes.2006.1709032","title":"A predictive phase locked loop applicable to utility and non-utility AC power systems","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Harmonics; Amplitude; Computer science; Control theory (sociology); Electronic engineering; Field-programmable gate array; Phase-locked loop; Power electronics; Phase noise; Engineering; Electrical engineering; Voltage; Physics","score_opus":0.0033365734636353977,"score_gpt":0.18961762437139265,"score_spread":0.18628105090775726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161377480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005645198,0.00026327837,0.98970836,0.00006120323,0.00007306954,0.000042993113,0.00002412567,0.0018107605,0.0023710765],"genre_scores_gemma":[0.6619056,0.0006026732,0.32928005,0.00016565548,0.00016408319,0.00026708824,0.000120533725,0.00013650382,0.0073579396],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980897,0.000037079146,0.0000099148665,0.00003839022,0.00009165333,0.000014051205],"domain_scores_gemma":[0.9997769,0.000103358194,0.000025288464,0.00003386537,0.000052719814,0.000007999917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022020329,0.00038188358,0.00032607716,0.00018835925,0.00024755887,0.00043979453,0.00064326153,0.0003838847,0.0023810759],"category_scores_gemma":[0.0009848028,0.000162268,0.00017083286,0.00029002145,0.00023125939,0.00034376996,0.0002765832,0.00054024864,0.00049248437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021535187,0.00008331982,0.0005479566,0.00026285028,0.000032987035,0.00033129207,0.00015094221,0.16826828,0.058794003,0.012338382,0.0035148442,0.7554598],"study_design_scores_gemma":[0.000047955422,0.00022558468,0.00022450686,0.000021856837,0.000021009235,0.0002535202,0.000014566306,0.9692124,0.01604216,0.003793317,0.010129494,0.000013633265],"about_ca_topic_score_codex":0.0008167171,"about_ca_topic_score_gemma":0.001135185,"teacher_disagreement_score":0.0023810759,"about_ca_system_score_codex":0.00015709706,"about_ca_system_score_gemma":0.00038971886,"threshold_uncertainty_score":0.007965505},"labels":[],"label_agreement":null},{"id":"W2164399519","doi":"10.1109/pes.2006.1709562","title":"Electromagnetic transient simulation of power electronic equipment in power systems: challenges and solutions","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council; University of Manitoba","funders":"","keywords":"Transient (computer programming); Computer science; Interpolation (computer graphics); Power electronics; Power (physics); Electronics; Limit (mathematics); Component (thermodynamics); Electric power system; Semiconductor device; Electronic engineering; Electrical engineering; Engineering; Telecommunications; Voltage","score_opus":0.006824149434693194,"score_gpt":0.19528666100985637,"score_spread":0.18846251157516317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164399519","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008642369,0.0016237864,0.9730565,0.0014609611,0.00023918162,0.00004951015,0.000036720918,0.0008930225,0.013997887],"genre_scores_gemma":[0.719644,0.013425138,0.22521599,0.00095856667,0.0007887075,0.00037547783,0.0004283861,0.0006585267,0.038505163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997172,0.00013388948,0.000011532264,0.000023722725,0.00009471333,0.00001889044],"domain_scores_gemma":[0.99951017,0.00031715567,0.00001597632,0.00004491592,0.00008812068,0.000023586803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006591201,0.00040783003,0.0006018362,0.00022902428,0.00038142788,0.0013128002,0.0005659571,0.0012852846,0.0048770374],"category_scores_gemma":[0.0015127554,0.00027160795,0.0005124911,0.0004878169,0.0005328326,0.0011003106,0.00046572398,0.0012094076,0.0012855448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006355946,0.000052998254,0.0005816533,0.00014696503,0.000022876564,0.00014488246,0.000066586,0.86579984,0.007099222,0.031986326,0.007929828,0.08610529],"study_design_scores_gemma":[0.000011608344,0.00004025604,0.00017084483,0.0000385509,0.0000071543946,0.00006765152,0.000031636588,0.96214044,0.0025577808,0.017289978,0.017633738,0.000010322548],"about_ca_topic_score_codex":0.0007819769,"about_ca_topic_score_gemma":0.0007983997,"teacher_disagreement_score":0.0048770374,"about_ca_system_score_codex":0.00045199774,"about_ca_system_score_gemma":0.00051583524,"threshold_uncertainty_score":0.016315281},"labels":[],"label_agreement":null},{"id":"W2165723336","doi":"10.1109/pes.2006.1708860","title":"Localized reactive power markets using the concept of voltage control areas","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Voltage optimisation; Volt-ampere reactive; Voltage; Power control; Control (management); Electric power system; Power (physics); Voltage regulation; Computer science; Control theory (sociology); Electrical engineering; Engineering; Physics","score_opus":0.00363905546666036,"score_gpt":0.18733620088808736,"score_spread":0.183697145421427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165723336","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021211995,0.0003436148,0.9638227,0.0001742586,0.000045682064,0.000078422054,0.000028037843,0.000098895114,0.014196311],"genre_scores_gemma":[0.8569158,0.00078542926,0.13169089,0.00013348176,0.00015869428,0.00029735718,0.00006688001,0.00008015153,0.009871258],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937916,0.0002476619,0.000016413542,0.00013684704,0.00016200743,0.0000578592],"domain_scores_gemma":[0.99946684,0.00026351833,0.000082785715,0.00006686172,0.00007619627,0.000043745073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000814014,0.0006520747,0.000617808,0.00024507372,0.0003650469,0.0016547912,0.0010590244,0.0006158339,0.009605786],"category_scores_gemma":[0.0012412037,0.00038150605,0.0007057828,0.000534434,0.0012814184,0.0023150404,0.0008937198,0.0009600971,0.00058392953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009446351,0.000075159325,0.00031334732,0.0001313078,0.000047425638,0.00020651607,0.0000728818,0.4389371,0.0073820213,0.5115938,0.0020324152,0.03911362],"study_design_scores_gemma":[0.000078880075,0.00031367844,0.00018410209,0.00002106587,0.000045297016,0.00018268684,0.000045145815,0.86937904,0.0026289336,0.117686816,0.009407218,0.000027118185],"about_ca_topic_score_codex":0.00070489454,"about_ca_topic_score_gemma":0.0009957094,"teacher_disagreement_score":0.009605786,"about_ca_system_score_codex":0.0010916158,"about_ca_system_score_gemma":0.0008205461,"threshold_uncertainty_score":0.032134593},"labels":[],"label_agreement":null},{"id":"W2166421587","doi":"10.1109/pes.2006.1709528","title":"Agent-based protection scheme for distribution networks with distributed generators","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Relay; Node (physics); Fault (geology); Asynchronous communication; Computer science; Transient (computer programming); Scheme (mathematics); Power-system protection; Protective relay; Interconnection; Topology (electrical circuits); Distributed computing; Computer network; Engineering; Electric power system; Electrical engineering; Power (physics)","score_opus":0.0048264836281571985,"score_gpt":0.1800593161522841,"score_spread":0.1752328325241269,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166421587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019433167,0.000332226,0.9718758,0.00019027984,0.00013786092,0.000092030336,0.000031837455,0.0007534697,0.007153212],"genre_scores_gemma":[0.85868204,0.00036596006,0.13223876,0.000084900414,0.000075041484,0.00016852225,0.000068132074,0.00002892177,0.008287804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997925,0.000059473357,0.000015244539,0.000037182286,0.00007685731,0.000018702312],"domain_scores_gemma":[0.99974436,0.00006250192,0.00005092664,0.000054449054,0.00006382066,0.000023886416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032336186,0.00030759582,0.00036233006,0.00024182255,0.0004362061,0.0005930179,0.0008474462,0.0005573773,0.0022244765],"category_scores_gemma":[0.00061083067,0.0001052303,0.00018377564,0.00019296592,0.00034485105,0.0008667045,0.0005899247,0.0005007345,0.00049762265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004881365,0.00029037273,0.0008230982,0.0003188549,0.00012235547,0.0007155932,0.0004512495,0.3543093,0.043321617,0.27778026,0.00844652,0.31293273],"study_design_scores_gemma":[0.00016826252,0.00024962562,0.00022688002,0.0000213962,0.000049096383,0.00024066135,0.000021042957,0.925584,0.008025997,0.032651544,0.032741502,0.000020016409],"about_ca_topic_score_codex":0.00048287594,"about_ca_topic_score_gemma":0.00065734476,"teacher_disagreement_score":0.0022244765,"about_ca_system_score_codex":0.00033564246,"about_ca_system_score_gemma":0.000342298,"threshold_uncertainty_score":0.00744164},"labels":[],"label_agreement":null},{"id":"W2166434031","doi":"10.1109/pes.2006.1709163","title":"On the accuracy of state estimation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Fault Detection and Control Systems","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Computer science; Least-squares function approximation; State (computer science); Estimation; Algorithm; Applied mathematics; Mathematics; Statistics; Engineering","score_opus":0.0040856571247125505,"score_gpt":0.19165168831386206,"score_spread":0.18756603118914952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166434031","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026205504,0.0029393604,0.95830584,0.0033032708,0.00041955005,0.000034443314,0.0002871904,0.001253874,0.007250931],"genre_scores_gemma":[0.83793277,0.0027187997,0.15309826,0.0007849684,0.0005674287,0.000071569724,0.0006037702,0.00055100495,0.0036713213],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98164684,0.0066664144,0.0012431036,0.0030712846,0.006486423,0.0008859719],"domain_scores_gemma":[0.88307244,0.08147948,0.0043758294,0.017757576,0.0129471645,0.00036745024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014333318,0.0011013555,0.0016005901,0.0015579774,0.00088286586,0.003657404,0.0015525277,0.0028839083,0.0017293617],"category_scores_gemma":[0.17335051,0.0006953136,0.00069374096,0.0016954674,0.002399851,0.0053028855,0.0034658075,0.003415461,0.0012231347],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00077989465,0.000076317185,0.016884644,0.0004401004,0.0002411718,0.00019800155,0.0005507749,0.47774848,0.0075617526,0.12904659,0.004286771,0.36218557],"study_design_scores_gemma":[0.000057433073,0.00013613966,0.0056281523,0.00026737366,0.00007196347,0.0002784157,0.00016886057,0.87315977,0.014355552,0.096904494,0.008891618,0.0000802665],"about_ca_topic_score_codex":0.0064488812,"about_ca_topic_score_gemma":0.0018828427,"teacher_disagreement_score":0.014333318,"about_ca_system_score_codex":0.0015266489,"about_ca_system_score_gemma":0.0019025664,"threshold_uncertainty_score":0.07580274},"labels":[],"label_agreement":null},{"id":"W2168106341","doi":"10.1109/pes.2006.1709169","title":"Sensitivity-based generation rescheduling for multicontingency voltage stability enhancement","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Sensitivity (control systems); Margin (machine learning); Generator (circuit theory); Voltage; Stability (learning theory); Control theory (sociology); Computer science; Power (physics); Electric power system; Electric generator; Engineering; Electronic engineering; Artificial intelligence; Electrical engineering; Machine learning; Control (management); Physics","score_opus":0.01174483151769114,"score_gpt":0.21238550659101685,"score_spread":0.2006406750733257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168106341","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023795247,0.0001201925,0.97375077,0.000057238987,0.000024048748,0.000028851895,0.000019256491,0.0007378442,0.0014665042],"genre_scores_gemma":[0.71412975,0.00010762888,0.28392914,0.0000707052,0.000044344823,0.00007131278,0.00005572414,0.00013629695,0.0014550192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924517,0.00024992027,0.000030726427,0.0001262728,0.0003054731,0.000042545293],"domain_scores_gemma":[0.9987588,0.00071137724,0.00015242792,0.00014392057,0.00020494875,0.000028630635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001221079,0.0008095271,0.0008575534,0.000782769,0.0003901277,0.00044803062,0.00076983677,0.0003649077,0.0012070265],"category_scores_gemma":[0.003512321,0.0003805375,0.0005298935,0.00047030835,0.00037952562,0.0006550998,0.0005232208,0.0008002105,0.0002319866],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013131958,0.000126186,0.0005810205,0.000067732915,0.00005629884,0.00010193168,0.00011021516,0.7548736,0.025096294,0.0069357674,0.0007686525,0.21115103],"study_design_scores_gemma":[0.00000583942,0.00003657638,0.00024843775,0.0000035086996,0.0000068588793,0.000029010309,0.0000032140786,0.9902503,0.007739979,0.0012145445,0.0004518885,0.000009965667],"about_ca_topic_score_codex":0.001331095,"about_ca_topic_score_gemma":0.0013405981,"teacher_disagreement_score":0.001331095,"about_ca_system_score_codex":0.0005492268,"about_ca_system_score_gemma":0.00058946153,"threshold_uncertainty_score":0.006457746},"labels":[],"label_agreement":null},{"id":"W2168392873","doi":"10.1109/pes.2006.1709469","title":"DC bus control of variable speed wind turbine using a buck-boost converter","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Motor Design and Analysis","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Turbine; Power optimizer; Wind speed; Permanent magnet synchronous generator; Maximum power principle; Maximum power point tracking; Wind power; Buck converter; Control theory (sociology); Power (physics); Automotive engineering; Engineering; Computer science; Electrical engineering; Magnet; Control (management); Photovoltaic system; Mechanical engineering; Physics; Voltage; Meteorology","score_opus":0.004744896404195087,"score_gpt":0.1796275704233535,"score_spread":0.1748826740191584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168392873","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13887937,0.001344245,0.7652798,0.00041589048,0.0006996216,0.00040406093,0.00036748438,0.01077204,0.08183753],"genre_scores_gemma":[0.96377534,0.0002709452,0.023961972,0.0001351752,0.00006168972,0.00009338663,0.00012241048,0.00006470283,0.011514369],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99988353,0.000013193155,0.000009806864,0.000026719286,0.00005519474,0.000011606865],"domain_scores_gemma":[0.99988854,0.000021022495,0.000011883658,0.000011612383,0.00005919692,0.000007630693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015196345,0.00029158543,0.00029220295,0.00028652747,0.0002754038,0.0007258827,0.00043919813,0.0002527659,0.0034469587],"category_scores_gemma":[0.00022372355,0.00013410316,0.00011486446,0.0002593095,0.00013701766,0.00024259547,0.00009612212,0.0003413481,0.0010918503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007343635,0.0003840309,0.0018914106,0.0015219281,0.00010957882,0.0008282325,0.0005292197,0.093150325,0.28587222,0.016586093,0.016106246,0.5822864],"study_design_scores_gemma":[0.00026933354,0.0011763674,0.004234747,0.00014506292,0.00010179008,0.0007768676,0.00009661522,0.82422084,0.118234016,0.007754949,0.042925086,0.00006446385],"about_ca_topic_score_codex":0.0009044037,"about_ca_topic_score_gemma":0.0013084848,"teacher_disagreement_score":0.0034469587,"about_ca_system_score_codex":0.00017315042,"about_ca_system_score_gemma":0.0001895762,"threshold_uncertainty_score":0.011531234},"labels":[],"label_agreement":null},{"id":"W2764720463","doi":"10.1109/pes.2006.1709392","title":"Investigating distributed generation systems performance using Monte Carlo simulation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Monte Carlo method; Randomness; Computer science; Electric power system; Distributed generation; Mathematical optimization; Simulation; Power (physics); Algorithm; Mathematics; Statistics","score_opus":0.014687511780507017,"score_gpt":0.20524477074484182,"score_spread":0.1905572589643348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764720463","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53066003,0.0006454406,0.44987637,0.0003468594,0.00005040711,0.00019301748,0.00040394685,0.00087350345,0.01695039],"genre_scores_gemma":[0.97587216,0.000106991174,0.023212213,0.00001544089,0.0000073441265,0.000055642176,0.00014572906,0.000036008674,0.0005485337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991335,0.00046130313,0.000026790836,0.00007152711,0.00024458268,0.0000623955],"domain_scores_gemma":[0.9916796,0.0068886727,0.00027562102,0.00041958626,0.0006596934,0.000076936616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001997822,0.00041838866,0.00057040894,0.0007493543,0.00031557947,0.0007956662,0.00047265552,0.0006427548,0.0021198008],"category_scores_gemma":[0.008036475,0.0002182173,0.0002826613,0.00091591,0.0002805716,0.00063181255,0.0003374675,0.0004255798,0.00020888369],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042365406,0.000017083674,0.0014406655,0.000014004189,0.000016295138,0.00002188042,0.000011925894,0.9911107,0.0003460878,0.0016683723,0.00015656085,0.0051540527],"study_design_scores_gemma":[0.0000031563004,0.000012407143,0.00022298709,0.0000024966155,0.0000024487117,0.000006582669,0.000003570661,0.9988764,0.00035536263,0.00043772568,0.00007438423,0.0000024261199],"about_ca_topic_score_codex":0.0053430204,"about_ca_topic_score_gemma":0.0030967337,"teacher_disagreement_score":0.0053430204,"about_ca_system_score_codex":0.0009379409,"about_ca_system_score_gemma":0.00042348818,"threshold_uncertainty_score":0.010623813},"labels":[],"label_agreement":null},{"id":"W2764750480","doi":"10.1109/pes.2006.1708890","title":"Unit commitment with primary frequency regulation constraints","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Magnetic Bearings and Levitation Dynamics","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Scheduling (production processes); Power system simulation; Contingency; Unit (ring theory); Frequency regulation; Automatic frequency control; Computer science; Control theory (sociology); Mathematical optimization; Mathematics; Control (management); Electric power system; Telecommunications; Physics; Power (physics)","score_opus":0.004745420869486867,"score_gpt":0.175892478508863,"score_spread":0.17114705763937613,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764750480","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008358065,0.017298147,0.2748853,0.0071264114,0.012075975,0.0009856301,0.0065456773,0.001522192,0.6712027],"genre_scores_gemma":[0.34354782,0.017774753,0.04517384,0.0016482122,0.005637457,0.0012893241,0.006394181,0.0006164363,0.577918],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943024,0.00015261259,0.000029158002,0.00016198063,0.00015316214,0.00007270987],"domain_scores_gemma":[0.99894744,0.00047934242,0.000121261146,0.00011546391,0.0002434716,0.00009302026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004935925,0.0016666243,0.0017686237,0.00045622024,0.00048198772,0.0018498403,0.0019513543,0.0016692319,0.26450676],"category_scores_gemma":[0.0024593591,0.00036208038,0.000555535,0.0016697287,0.0005853369,0.0009083654,0.00093309686,0.0016196751,0.050388347],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040736087,0.00012325922,0.00041320958,0.0020017254,0.000114256276,0.0010642266,0.00010860743,0.19415358,0.0017842391,0.24377885,0.38126114,0.17478952],"study_design_scores_gemma":[0.0002566045,0.0002982225,0.0005623146,0.00059061794,0.00009990698,0.00041462,0.00009826188,0.19873103,0.0010541966,0.11779031,0.6800278,0.00007608572],"about_ca_topic_score_codex":0.0018746832,"about_ca_topic_score_gemma":0.0024782065,"teacher_disagreement_score":0.26450676,"about_ca_system_score_codex":0.00095136196,"about_ca_system_score_gemma":0.0011585855,"threshold_uncertainty_score":0.88486326},"labels":[],"label_agreement":null},{"id":"W2985214757","doi":"10.1109/pes.2006.1709599","title":"The impact of the restructuring of the electric power industry on its workforce","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Workforce; Restructuring; Electric power industry; Presentation (obstetrics); Power (physics); Business; Industrial organization; Telecommunications; Engineering; Electricity; Electrical engineering; Economics; Economic growth; Finance; Physics; Medicine","score_opus":0.0054089223246507525,"score_gpt":0.20661202964091643,"score_spread":0.20120310731626567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985214757","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27973112,0.008522771,0.0009167393,0.41735873,0.003447732,0.0000388648,0.0012460533,0.000050635426,0.2886874],"genre_scores_gemma":[0.91265416,0.006756694,0.0003029473,0.023293871,0.0015072232,0.000028061348,0.00041617235,0.000029088167,0.05501168],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9987238,0.00033615754,0.000021567956,0.000060268518,0.00030149237,0.00055673474],"domain_scores_gemma":[0.9955343,0.00075865746,0.00026991058,0.0000677048,0.0013460625,0.0020233972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020387056,0.00017588907,0.00013236621,0.00038416553,0.0013670458,0.0020344763,0.00053635484,0.0014463974,0.016588682],"category_scores_gemma":[0.0076081627,0.000083967214,0.00021040083,0.00062402023,0.00076775136,0.0012387731,0.0012843565,0.0016261388,0.0014125045],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066577294,0.000480265,0.072341904,0.00047930787,0.000033324122,0.00096691906,0.0038699857,0.0050738407,0.0019274204,0.11400995,0.47115946,0.32899192],"study_design_scores_gemma":[0.00009200622,0.00048355895,0.25727114,0.0007216884,0.00003519998,0.0003805697,0.021740375,0.002451372,0.0010512653,0.022964314,0.6927506,0.000058011436],"about_ca_topic_score_codex":0.05412761,"about_ca_topic_score_gemma":0.13098706,"teacher_disagreement_score":0.05412761,"about_ca_system_score_codex":0.0047121975,"about_ca_system_score_gemma":0.010153164,"threshold_uncertainty_score":0.10762507},"labels":[],"label_agreement":null},{"id":"W3151851172","doi":"10.1109/pes.2006.1708950","title":"The technical talent challenge","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Thermal Analysis in Power Transmission","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Presentation (obstetrics); Engineering management; Panel discussion; Engineering; Computer science; Telecommunications; Engineering ethics; Business","score_opus":0.0034842943428437414,"score_gpt":0.1853983508491072,"score_spread":0.18191405650626344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3151851172","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018272793,0.005655373,0.0039847824,0.72892934,0.025701,0.00003340873,0.00016828348,0.00015566112,0.23354495],"genre_scores_gemma":[0.081417955,0.007959458,0.0042509106,0.24075669,0.029394345,0.00023840001,0.00041695772,0.0005192991,0.635046],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9911277,0.0021454545,0.00021983946,0.0010005977,0.0037224006,0.0017838918],"domain_scores_gemma":[0.98038334,0.0034315877,0.0004911556,0.0012240043,0.0052826935,0.009187223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013496829,0.00074040925,0.00066823215,0.0016023094,0.006292179,0.016750766,0.0025224295,0.008390822,0.06832415],"category_scores_gemma":[0.022221206,0.0002791388,0.0005551999,0.001102283,0.006121455,0.011583383,0.007875164,0.012446682,0.0323663],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017609995,0.000047357647,0.0002037135,0.000042292155,0.000005113016,0.00008660606,0.00040969427,0.000110067194,0.0001855027,0.3018257,0.6616626,0.03540372],"study_design_scores_gemma":[0.0000085286165,0.00002299483,0.00022438359,0.00007784498,0.0000020454395,0.00011719575,0.00052875053,0.00015631817,0.00006536546,0.08079967,0.91798556,0.000011378034],"about_ca_topic_score_codex":0.002196535,"about_ca_topic_score_gemma":0.0032959655,"teacher_disagreement_score":0.06832415,"about_ca_system_score_codex":0.0045684683,"about_ca_system_score_gemma":0.0121345185,"threshold_uncertainty_score":0.22856706},"labels":[],"label_agreement":null},{"id":"W858200838","doi":"10.1109/pes.2006.1709292","title":"An optimum reactance one-port compensator for harmonic mitigation","year":2006,"lang":"en","type":"article","venue":"2006 IEEE Power Engineering Society General Meeting","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reactance; Harmonic; Control theory (sociology); Total harmonic distortion; Nonlinear system; Distortion (music); Particle swarm optimization; Power (physics); Port (circuit theory); Computer science; Engineering; Mathematical optimization; Voltage; Mathematics; Electronic engineering; Electrical engineering; Physics; Acoustics","score_opus":0.01299524924581397,"score_gpt":0.2302574792226738,"score_spread":0.21726222997685984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W858200838","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02273442,0.00025782606,0.969508,0.00017973481,0.000062376355,0.00005202731,0.00005664783,0.0007612374,0.0063876496],"genre_scores_gemma":[0.8151328,0.00027538696,0.17606804,0.0001410992,0.00006276753,0.00009154239,0.00011082441,0.00006481498,0.008052819],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998197,0.00003890278,0.0000082957495,0.0000592339,0.00005662999,0.000017222323],"domain_scores_gemma":[0.99989533,0.000023169761,0.00003526739,0.000008696137,0.00003138437,0.000006168838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023340319,0.0006858926,0.0005289831,0.00022756719,0.00031731662,0.00047857227,0.00070517475,0.00079621765,0.0029270283],"category_scores_gemma":[0.00032477226,0.00024225918,0.00034201454,0.00023289924,0.00021069714,0.0005036324,0.00018633196,0.0004980134,0.0007859658],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005731901,0.00014653227,0.0009093026,0.00045033084,0.00013077447,0.0005307915,0.00016919238,0.47408575,0.26227564,0.024613315,0.0062515964,0.22986361],"study_design_scores_gemma":[0.00011024583,0.0004020026,0.0004186078,0.00002674501,0.00007877877,0.00030940975,0.000017114457,0.9629726,0.02537489,0.0024340001,0.007824201,0.000031499505],"about_ca_topic_score_codex":0.0009134023,"about_ca_topic_score_gemma":0.0023562608,"teacher_disagreement_score":0.0029270283,"about_ca_system_score_codex":0.00029490062,"about_ca_system_score_gemma":0.00039125717,"threshold_uncertainty_score":0.009791911},"labels":[],"label_agreement":null}]}