{"meta":{"query_hash":"a5979b7f61ce","filters":{"venue":"Architectural Engineering and Design Management"},"cohort_total":9,"direct_labels_cover":0,"predictions_cover":9,"exported":9,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/a5979b7f61ce","api":"https://metacan.xera.ac/api/v1/cohort?venue=Architectural+Engineering+and+Design+Management"},"results":[{"id":"W1973484051","doi":"10.3763/aedm.2008.0097","title":"The Dynamics of Actors' and Stakeholders' Participation: An Approach of Management by Design","year":2008,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Design Education and Practice","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Structuring; Process (computing); Process management; Project management; Knowledge management; Construct (python library); Perspective (graphical); Project charter; Project stakeholder; Management science; Computer science; Project management triangle; Engineering; Systems engineering; Business","score_opus":0.04301591128717112,"score_gpt":0.23077818036699363,"score_spread":0.18776226907982252,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1973484051","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016938126,0.0043082964,0.78031784,0.019961802,0.0005520244,0.00043786946,0.00008929747,0.0000997874,0.17729497],"genre_scores_gemma":[0.67546,0.003403642,0.3016452,0.0014127588,0.00035258598,0.0016442048,0.00009148179,0.00014788996,0.015842209],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.97796637,0.018284762,0.00037878484,0.0010598303,0.0016081115,0.0007021842],"domain_scores_gemma":[0.9883659,0.008394478,0.0005387072,0.0010748358,0.0009874325,0.0006386894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020390816,0.0013922447,0.0011172333,0.004022333,0.006780536,0.01382336,0.003875623,0.0042102486,0.004862122],"category_scores_gemma":[0.009163152,0.0012093327,0.0015094897,0.003025304,0.033591494,0.011673221,0.010447132,0.0050742174,0.0005763988],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009398992,0.000020471298,0.00021883083,0.00006769295,0.00001228043,0.00012162254,0.008983199,0.0017936974,0.00008172931,0.98365295,0.00071498787,0.004323207],"study_design_scores_gemma":[0.000034060122,0.000039109975,0.00018852518,0.00025643603,0.000024761193,0.0001623754,0.008202057,0.014569126,0.00021135174,0.9113311,0.06495586,0.000025167968],"about_ca_topic_score_codex":0.0029913355,"about_ca_topic_score_gemma":0.0029068014,"teacher_disagreement_score":0.020390816,"about_ca_system_score_codex":0.010729568,"about_ca_system_score_gemma":0.0075115375,"threshold_uncertainty_score":0.10783827},"labels":[],"label_agreement":null},{"id":"W1984359850","doi":"10.3763/aedm.2009.0110","title":"Relationships between Construction Clients and Participants of the Building Industry: Structures and Mechanisms of Coordination and Communication","year":2011,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal","funders":"","keywords":"Procurement; Business; Knowledge management; Construction industry; Corporate governance; Order (exchange); Process management; Public relations; Organizational structure; Marketing; Engineering; Management; Computer science; Political science","score_opus":0.1458292061480229,"score_gpt":0.3048245501144367,"score_spread":0.15899534396641382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984359850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96894777,0.00030265137,0.0076573896,0.0017831584,0.000006585023,0.000106960986,0.00002590291,0.000028104232,0.02114149],"genre_scores_gemma":[0.99877614,0.00006293179,0.00059215113,0.000023303111,0.0000021797448,0.000028020862,0.0000054128495,0.0000032858,0.0005066235],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9712931,0.020746848,0.0008687478,0.0013424625,0.0036791803,0.0020696237],"domain_scores_gemma":[0.95107156,0.03415607,0.0063305367,0.0019242252,0.003896513,0.0026210847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017110601,0.0003179668,0.0005655737,0.002503362,0.007298544,0.012381423,0.0016189003,0.0020087261,0.0068873023],"category_scores_gemma":[0.03993111,0.00060694973,0.00020721245,0.0019333793,0.013416971,0.005326796,0.006008384,0.0014975286,0.00040750008],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022808762,0.00016349106,0.11892845,0.00021271198,0.000045372126,0.0012661912,0.75199264,0.0011415719,0.0028177998,0.07661567,0.0008525471,0.04573537],"study_design_scores_gemma":[0.000055239652,0.00015865665,0.04850786,0.00037809115,0.000044839893,0.0007787734,0.9073774,0.004089733,0.0012251369,0.024422335,0.012882688,0.00007928547],"about_ca_topic_score_codex":0.023474995,"about_ca_topic_score_gemma":0.011868484,"teacher_disagreement_score":0.023474995,"about_ca_system_score_codex":0.0083741,"about_ca_system_score_gemma":0.012158211,"threshold_uncertainty_score":0.09049058},"labels":[],"label_agreement":null},{"id":"W2067503067","doi":"10.3763/aedm.2010.idds1","title":"Challenges for Integrated Design and Delivery Solutions","year":2010,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Interoperability; Process (computing); Bridge (graph theory); Knowledge management; Workforce; Engineering; Process management; Integrated project delivery; Engineering management; Isolation (microbiology); Systems engineering; Project management; Computer science","score_opus":0.022808098381623735,"score_gpt":0.194623944328585,"score_spread":0.17181584594696128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067503067","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019717703,0.016626293,0.34437236,0.44358006,0.0027845148,0.00055415626,0.00025041998,0.0013971542,0.17071734],"genre_scores_gemma":[0.39805982,0.01567272,0.50157416,0.030961173,0.0019694425,0.0020146722,0.00091024506,0.00057980133,0.048257906],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9653184,0.014891631,0.0023479927,0.0026047092,0.011868749,0.00296856],"domain_scores_gemma":[0.9670192,0.012762406,0.0018115455,0.0043452946,0.010384371,0.0036772364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0507648,0.0012036075,0.0013516505,0.0024990304,0.0036819149,0.020893248,0.0068763164,0.012991673,0.013175818],"category_scores_gemma":[0.039892,0.001087745,0.0016599497,0.002262893,0.0073409704,0.023284603,0.015673386,0.008858292,0.005213252],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040721097,0.0003038861,0.00074859103,0.00064161624,0.00007166294,0.00019533024,0.0024716596,0.008928448,0.0009379331,0.77975535,0.037785426,0.16811946],"study_design_scores_gemma":[0.00006562102,0.00014532664,0.00052170287,0.0007741236,0.00004126252,0.0002843288,0.007813914,0.013417107,0.0005745824,0.59248227,0.38382158,0.00005818287],"about_ca_topic_score_codex":0.004075248,"about_ca_topic_score_gemma":0.0017978374,"teacher_disagreement_score":0.0507648,"about_ca_system_score_codex":0.008168339,"about_ca_system_score_gemma":0.02447355,"threshold_uncertainty_score":0.26847315},"labels":[],"label_agreement":null},{"id":"W2810587289","doi":"10.1080/17452007.2018.1491384","title":"Organizational cultural compatibility of engineered wood products manufacturers and building specifiers in the Pacific Northwest","year":2018,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Compatibility (geochemistry); Architectural engineering; Engineering; Business","score_opus":0.03867988021771775,"score_gpt":0.2722352747757205,"score_spread":0.23355539455800275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810587289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9989644,0.000028826636,0.000037799357,0.00007480791,7.12563e-7,0.0000024873218,0.000004158482,2.9112604e-7,0.00088644354],"genre_scores_gemma":[0.9995592,0.000059890066,0.000080256716,0.000036628397,6.984704e-7,0.0000056661875,0.000011975706,6.783114e-7,0.00024499279],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9981382,0.0007704378,0.00009753547,0.00015169446,0.0005021512,0.0003400195],"domain_scores_gemma":[0.9948035,0.0017663285,0.0015286562,0.00020442427,0.000722353,0.00097479165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002826122,0.00015703954,0.00023801396,0.0010960157,0.0035181572,0.0022430995,0.0006022663,0.00039799506,0.0017029365],"category_scores_gemma":[0.0068809786,0.00028089414,0.000111597205,0.0013570407,0.002287505,0.0012665814,0.003353273,0.000833274,0.000073937066],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013828804,0.00018836862,0.79606956,0.000049928374,0.000042493244,0.0005509515,0.18009615,0.0001588698,0.0009964386,0.0011879666,0.00025935538,0.020261582],"study_design_scores_gemma":[0.0000048717725,0.00006279439,0.5868307,0.00006199656,0.000012562399,0.00012366098,0.41050157,0.00027982614,0.0003075042,0.00024926377,0.0015507914,0.0000145456315],"about_ca_topic_score_codex":0.09477428,"about_ca_topic_score_gemma":0.17098227,"teacher_disagreement_score":0.09477428,"about_ca_system_score_codex":0.003038173,"about_ca_system_score_gemma":0.004550661,"threshold_uncertainty_score":0.18844527},"labels":[],"label_agreement":null},{"id":"W3175419228","doi":"10.1080/17452007.2021.1941740","title":"Computerized DSS for evaluating design performance of residential buildings using additive weighting approach","year":2021,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Weighting; Multiple-criteria decision analysis; Rank (graph theory); Decision support system; Computer science; Process (computing); Architectural design; Architectural engineering; Engineering; Systems engineering; Operations research; Artificial intelligence; Architecture","score_opus":0.02794325319024687,"score_gpt":0.25117533192511393,"score_spread":0.22323207873486706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3175419228","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19026917,0.00010765265,0.798576,0.000104095234,0.000031438398,0.0008293392,0.0009810794,0.0035254247,0.005575777],"genre_scores_gemma":[0.39838216,0.0000981101,0.5986323,0.000021021962,0.000010101089,0.000669309,0.00076717854,0.000052013536,0.0013679429],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99800164,0.0009148002,0.00023596564,0.00017902149,0.00060249725,0.00006616384],"domain_scores_gemma":[0.99519074,0.002694839,0.00041554892,0.00038856006,0.0012014041,0.000108912594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033354722,0.0009714808,0.0007775146,0.0030920592,0.0003762157,0.0013037918,0.0007767163,0.00048750083,0.0039858934],"category_scores_gemma":[0.009185123,0.00036774448,0.00053413585,0.0024702838,0.00021743326,0.00089492294,0.0008761149,0.00050175504,0.00055340177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065714045,0.00065981585,0.011109881,0.0005586972,0.00016484784,0.000145644,0.0008005808,0.3227291,0.02374851,0.008595931,0.003027446,0.62780243],"study_design_scores_gemma":[0.00009049725,0.00029828527,0.0026054794,0.00003268566,0.00005213842,0.000035282723,0.00021726331,0.98171574,0.0075722327,0.004198996,0.0031485395,0.000032873002],"about_ca_topic_score_codex":0.0030793196,"about_ca_topic_score_gemma":0.0049114563,"teacher_disagreement_score":0.0039858934,"about_ca_system_score_codex":0.0009804813,"about_ca_system_score_gemma":0.0009282305,"threshold_uncertainty_score":0.017639875},"labels":[],"label_agreement":null},{"id":"W4281785830","doi":"10.1080/17452007.2022.2080173","title":"Optimizing daylight, energy and occupant comfort performance of classrooms with photovoltaic integrated vertical shading devices","year":2022,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Daylight; Shading; Plug-in; Photovoltaic system; Computer science; Daylighting; Illuminance; Electric light; Simulation; Automotive engineering; Process (computing); Thermal comfort; Architectural engineering; Engineering; Computer graphics (images)","score_opus":0.006045389680715964,"score_gpt":0.16050576849199005,"score_spread":0.15446037881127408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281785830","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7612016,0.0004044631,0.22776273,0.000088350105,0.00001862457,0.00004697441,0.00012350453,0.0001695076,0.010184186],"genre_scores_gemma":[0.98337376,0.00008576556,0.015475434,0.000009384557,0.0000019332026,0.000020071027,0.00003172636,0.000014187633,0.0009877856],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999124,0.000018353274,0.0000027344563,0.000015484025,0.000025741412,0.00002534182],"domain_scores_gemma":[0.999941,0.00002279445,0.000013339779,0.0000055540368,0.000011262301,0.0000061288683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018583004,0.00044816837,0.00032054144,0.00019075406,0.00014434861,0.00055367005,0.00032258686,0.00033128302,0.0009944338],"category_scores_gemma":[0.00026324712,0.00020791798,0.00041635672,0.00017059017,0.00016660226,0.00029367142,0.00033350763,0.00020413773,0.0001322306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005384041,0.00005876592,0.0012402808,0.00007122955,0.00002134072,0.00004155274,0.000019968908,0.961165,0.024873385,0.00062558596,0.00013218033,0.011696879],"study_design_scores_gemma":[0.000012963483,0.00025491996,0.0016395866,0.0000076256074,0.000027730248,0.00003052044,0.00006534354,0.9888644,0.007908319,0.00052845356,0.00065073435,0.000009489307],"about_ca_topic_score_codex":0.0015715655,"about_ca_topic_score_gemma":0.003383682,"teacher_disagreement_score":0.0015715655,"about_ca_system_score_codex":0.00033608303,"about_ca_system_score_gemma":0.00037214937,"threshold_uncertainty_score":0.0033267736},"labels":[],"label_agreement":null},{"id":"W4388759340","doi":"10.1080/17452007.2023.2283761","title":"Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework","year":2023,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Knowledge management; Sociotechnical system; Project management; Context (archaeology); Value (mathematics); Project team; Project stakeholder; Process management; Computer science; Engineering; Project management triangle; Project charter; Systems engineering","score_opus":0.061766915942966884,"score_gpt":0.32352528546422943,"score_spread":0.2617583695212625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388759340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0723618,0.0009367982,0.86372805,0.015426556,0.00013522069,0.00046910447,0.00017335381,0.00026354086,0.04650553],"genre_scores_gemma":[0.58904475,0.0007157913,0.406999,0.0002584053,0.00005755487,0.00043907136,0.00014139518,0.000069741225,0.0022742746],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9901314,0.0066627986,0.0004222763,0.0008176696,0.0014360639,0.0005297155],"domain_scores_gemma":[0.9803782,0.012134476,0.0026686317,0.0015475294,0.0021993818,0.0010717531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016328566,0.0012443621,0.00039612633,0.01061063,0.0042351494,0.01289441,0.0028784494,0.0020296392,0.0015765828],"category_scores_gemma":[0.01673407,0.00076095475,0.00074787653,0.005238079,0.018921027,0.01296698,0.0074746707,0.0026939064,0.00026545874],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023139573,0.00013774926,0.006953382,0.00027171415,0.00004494309,0.00044162315,0.028828256,0.011199604,0.0011068681,0.88898957,0.0012184221,0.06078471],"study_design_scores_gemma":[0.000017314354,0.000078377365,0.00466583,0.00073805434,0.00006218731,0.00027365706,0.039266575,0.07151507,0.0014490711,0.83452743,0.04732753,0.00007891055],"about_ca_topic_score_codex":0.0072901235,"about_ca_topic_score_gemma":0.01083154,"teacher_disagreement_score":0.016328566,"about_ca_system_score_codex":0.0085079605,"about_ca_system_score_gemma":0.01064491,"threshold_uncertainty_score":0.08635467},"labels":[],"label_agreement":null},{"id":"W4409443133","doi":"10.1080/17452007.2025.2482676","title":"Evaluating circular economy strategies at the end-of-life stage of a mass timber building: pathways for sustainable construction","year":2025,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Sustainable Design and Development","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Circular economy; Architectural engineering; Engineering; Business; Construction engineering; Ecology","score_opus":0.019021271014716533,"score_gpt":0.24199451243031575,"score_spread":0.2229732414155992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409443133","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9494672,0.0010582785,0.024442183,0.00060471427,0.000028465136,0.0020928285,0.00055946474,0.00005479614,0.021692201],"genre_scores_gemma":[0.9802003,0.00052135217,0.017286725,0.000039139057,0.0000017073144,0.00033769704,0.00023875343,0.000010476387,0.0013639017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9976815,0.0009913548,0.000060074508,0.00016817074,0.0005939861,0.00050492445],"domain_scores_gemma":[0.99434435,0.0025349515,0.00048025118,0.00018667562,0.0020608525,0.00039289513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005359228,0.0012288028,0.00057128165,0.0015792773,0.0010512067,0.0032924302,0.0010997249,0.0012162252,0.0026561955],"category_scores_gemma":[0.0077251834,0.00035230423,0.0008969128,0.0015808068,0.0014000455,0.0019718457,0.0014367206,0.0008471168,0.00019054137],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013705362,0.0016590456,0.038606722,0.0015157445,0.0002741364,0.0005905364,0.0008535854,0.82014185,0.014409662,0.020556645,0.0014112846,0.098610215],"study_design_scores_gemma":[0.0003705114,0.009576859,0.07617532,0.0006925429,0.0006234931,0.0001523935,0.015168753,0.8397195,0.028032875,0.016407099,0.012813016,0.00026765183],"about_ca_topic_score_codex":0.25236562,"about_ca_topic_score_gemma":0.36628366,"teacher_disagreement_score":0.25236562,"about_ca_system_score_codex":0.02220596,"about_ca_system_score_gemma":0.01886717,"threshold_uncertainty_score":0.5017934},"labels":[],"label_agreement":null},{"id":"W4416582103","doi":"10.1080/17452007.2025.2592866","title":"Redefining the critical path: design-engineering interfaces and productization in mass timber construction","year":2025,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Australian Government","keywords":"Construction industry; Architecture; Critical mass (sociodynamics); Work (physics)","score_opus":0.009947909046616093,"score_gpt":0.19046794313052248,"score_spread":0.18052003408390638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416582103","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9121702,0.00046214295,0.04834543,0.00093303144,0.000015640371,0.0001600319,0.000025496207,0.000062284074,0.037825838],"genre_scores_gemma":[0.98791844,0.000111990754,0.010631779,0.000045662517,0.000002436248,0.000035698158,0.000013883118,0.000020933534,0.0012191195],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.99323213,0.0036404566,0.00025522918,0.00055001443,0.0016689317,0.0006531979],"domain_scores_gemma":[0.98567235,0.008777345,0.0024493404,0.0009480866,0.0015409525,0.00061192433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007496845,0.0004736969,0.00020055809,0.0019350677,0.003413452,0.005425978,0.0011537326,0.00093400193,0.0037189142],"category_scores_gemma":[0.015049131,0.0005936035,0.00028145654,0.0015519084,0.010293162,0.0059862714,0.0043122894,0.001696534,0.00026628893],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003720106,0.00047425108,0.08948368,0.0007748854,0.000046297202,0.0022269862,0.45415166,0.0064833565,0.017518466,0.21149206,0.001310631,0.2156657],"study_design_scores_gemma":[0.00005933462,0.0010249732,0.16372381,0.001045896,0.000089397065,0.0023857355,0.55098116,0.011534452,0.01570119,0.13595285,0.11731753,0.00018365595],"about_ca_topic_score_codex":0.0055897716,"about_ca_topic_score_gemma":0.009121314,"teacher_disagreement_score":0.007496845,"about_ca_system_score_codex":0.0067716367,"about_ca_system_score_gemma":0.0064247656,"threshold_uncertainty_score":0.04913193},"labels":[],"label_agreement":null}]}