{"meta":{"query_hash":"40b4e51eda01","filters":{"venue":"Automation in Construction"},"cohort_total":190,"direct_labels_cover":0,"predictions_cover":190,"exported":190,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/40b4e51eda01","api":"https://metacan.xera.ac/api/v1/cohort?venue=Automation+in+Construction"},"results":[{"id":"W1042486207","doi":"10.1016/j.autcon.2015.07.002","title":"Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Productivity; Prefabrication; Process (computing); Action research; Engineering; Business; Process management; Industrial organization; Operations management; Computer science; Economics; Civil engineering; Management; Economic growth","score_opus":0.10529566150774342,"score_gpt":0.341895599603656,"score_spread":0.2365999380959126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1042486207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966725,0.000008132116,0.0006761529,0.00006091577,0.0000019457775,0.000021197866,0.000046092624,0.000010792719,0.0025022824],"genre_scores_gemma":[0.9970203,0.000016237984,0.0022381265,0.000011021077,0.0000013331542,0.000020333224,0.000048907616,0.0000029892137,0.0006407577],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.996876,0.0017508159,0.00011461798,0.00023014074,0.0006455983,0.00038281525],"domain_scores_gemma":[0.9897641,0.006606202,0.0007684512,0.000638993,0.001478558,0.00074369827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036234804,0.00035056387,0.00023024381,0.0010548629,0.0016084267,0.0014312685,0.0006312786,0.0005215916,0.0022050058],"category_scores_gemma":[0.009841791,0.0001878868,0.00022613857,0.0013404231,0.00080341153,0.0008022422,0.0012204058,0.0004761154,0.00031884958],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002476841,0.0051515396,0.71942466,0.00018672734,0.00011284714,0.0009942554,0.02112702,0.01738825,0.013781303,0.005553061,0.0014589933,0.2123446],"study_design_scores_gemma":[0.00009961192,0.003924734,0.880361,0.00006608675,0.000114445065,0.00025366593,0.042397182,0.05769297,0.007670345,0.0031882066,0.0041640704,0.000067610934],"about_ca_topic_score_codex":0.018449575,"about_ca_topic_score_gemma":0.032028522,"teacher_disagreement_score":0.018449575,"about_ca_system_score_codex":0.0021599117,"about_ca_system_score_gemma":0.0037809487,"threshold_uncertainty_score":0.036684394},"labels":[],"label_agreement":null},{"id":"W1270902396","doi":"10.1016/j.autcon.2015.08.004","title":"Optimization of overlapping activities in the design phase of construction projects","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Product Development and Customization","field":"Business, Management and Accounting","cited_by":42,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Rework; Critical path method; Schedule; Genetic algorithm; Computer science; Path (computing); Duration (music); Mathematical optimization; Phase (matter); Industrial engineering; Operations research; Systems engineering; Engineering; Machine learning; Mathematics","score_opus":0.0466782462026873,"score_gpt":0.25700753677555727,"score_spread":0.21032929057286998,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1270902396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6616541,0.00040094677,0.32888806,0.00007562915,0.000015481206,0.00019701976,0.000066057895,0.0004331935,0.008269535],"genre_scores_gemma":[0.9578793,0.000068006506,0.041244984,0.000005554498,0.000002672188,0.00006921969,0.000051920048,0.000031773307,0.0006465555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981389,0.0007854174,0.00009081347,0.00020137015,0.00046899595,0.00031441048],"domain_scores_gemma":[0.9964218,0.0021873582,0.0004792604,0.000237489,0.0004667153,0.00020742547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017225426,0.00086147134,0.0009554264,0.0012677056,0.00061493623,0.0013443584,0.00057158695,0.00050882174,0.0021347955],"category_scores_gemma":[0.0049429857,0.000533921,0.0005009627,0.0010368752,0.00042135734,0.000884576,0.0009815496,0.000455424,0.0002499288],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014614023,0.0006255024,0.006636745,0.000258003,0.00005309179,0.0001071723,0.0002868736,0.700574,0.025832476,0.0036344999,0.00032061734,0.2602096],"study_design_scores_gemma":[0.000084323096,0.0013825927,0.009213792,0.000039074635,0.00010667604,0.00007618219,0.00030480837,0.95836157,0.025194341,0.0034602073,0.0017469127,0.000029448285],"about_ca_topic_score_codex":0.002594795,"about_ca_topic_score_gemma":0.0026465808,"teacher_disagreement_score":0.002594795,"about_ca_system_score_codex":0.00082067464,"about_ca_system_score_gemma":0.0017775673,"threshold_uncertainty_score":0.009109795},"labels":[],"label_agreement":null},{"id":"W1706103706","doi":"10.1016/j.autcon.2015.07.023","title":"Queue performance measures in construction simulation models containing subjective uncertainty","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Queueing theory; Discrete event simulation; Fuzzy logic; Queue; Computer science; Vagueness; Fuzzy set; Event (particle physics); Operations research; Mathematical optimization; Engineering; Simulation; Mathematics; Artificial intelligence","score_opus":0.028349473416736236,"score_gpt":0.24084852429054276,"score_spread":0.21249905087380652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1706103706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29979986,0.0008249713,0.69485396,0.0008833751,0.00013731772,0.00006987872,0.00039819285,0.00034195266,0.0026904868],"genre_scores_gemma":[0.9884052,0.00019233963,0.00976027,0.00005575777,0.000040828676,0.00004437671,0.0002568544,0.00005807525,0.001186339],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975169,0.0012028555,0.00015883699,0.0003675501,0.00036769576,0.0003861604],"domain_scores_gemma":[0.9583318,0.03383413,0.0030889467,0.00089742296,0.0028356423,0.0010120258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010891863,0.0011733415,0.001522631,0.001685424,0.00073863193,0.003058686,0.001973979,0.002299165,0.0015977398],"category_scores_gemma":[0.04443615,0.0008197977,0.00093717215,0.0014366392,0.0014400712,0.003402026,0.0015162613,0.0015112257,0.00017363252],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007944806,0.000036749458,0.0015552007,0.000028955088,0.00002858687,0.000027898517,0.000051088227,0.981077,0.00023173649,0.014795944,0.00025270577,0.001834744],"study_design_scores_gemma":[0.0000032157454,0.000014329932,0.0002331551,0.0000036211193,0.0000068257737,0.0000027188778,0.000008351412,0.9971328,0.000072906565,0.0024845223,0.00003099918,0.0000066516945],"about_ca_topic_score_codex":0.016857626,"about_ca_topic_score_gemma":0.007951784,"teacher_disagreement_score":0.016857626,"about_ca_system_score_codex":0.0036004542,"about_ca_system_score_gemma":0.0021654447,"threshold_uncertainty_score":0.057602406},"labels":[],"label_agreement":null},{"id":"W1964796479","doi":"10.1016/j.autcon.2008.03.002","title":"IT usage in Alberta's building construction projects: Current status and challenges","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Lagging; Unavailability; Construction industry; Stakeholder; Information technology; Construction management; Engineering; Information and Communications Technology; Business; Engineering management; Knowledge management; Construction engineering; Public relations; Computer science; Civil engineering","score_opus":0.024102060240323738,"score_gpt":0.240846735745405,"score_spread":0.21674467550508125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1964796479","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94124883,0.010888707,0.0020134784,0.007052915,0.00007442709,0.000029793855,0.000686011,0.000090401496,0.03791548],"genre_scores_gemma":[0.98239076,0.010209563,0.0018718095,0.00043778864,0.000037721762,0.000020041673,0.00055236,0.000028621986,0.004451364],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99327374,0.0014633192,0.0003201352,0.00043586866,0.0033354736,0.0011715153],"domain_scores_gemma":[0.988528,0.003261722,0.001430016,0.00034556637,0.005110409,0.0013242195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038848473,0.00033508072,0.00044005705,0.003715891,0.002231787,0.0060114716,0.0020331203,0.0011627426,0.0026809678],"category_scores_gemma":[0.0069222427,0.00030849068,0.0003973805,0.010336266,0.0023424302,0.0024753744,0.0020512755,0.0009454325,0.0003799575],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023269972,0.0003080681,0.50253683,0.00064220437,0.00007173534,0.000491508,0.017801618,0.0020167967,0.0014930431,0.0066184243,0.006696232,0.46109083],"study_design_scores_gemma":[0.000014103267,0.00018071473,0.79913193,0.0014071482,0.000112604546,0.0006369736,0.09245109,0.0049912836,0.001511753,0.002716491,0.096738294,0.00010768394],"about_ca_topic_score_codex":0.75693655,"about_ca_topic_score_gemma":0.8365416,"teacher_disagreement_score":0.24306345,"about_ca_system_score_codex":0.010867238,"about_ca_system_score_gemma":0.021803835,"threshold_uncertainty_score":0.48898977},"labels":[],"label_agreement":null},{"id":"W1968200193","doi":"10.1016/j.autcon.2014.05.014","title":"The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":533,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Laser scanning; Building information modeling; Engineering; Construction engineering; Computer science; Laser; Operations management; Physics","score_opus":0.02227891485779354,"score_gpt":0.2677841352739924,"score_spread":0.24550522041619888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968200193","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38689333,0.0015954871,0.51663405,0.0047317413,0.00019640553,0.00025384594,0.0002365732,0.0007311101,0.08872753],"genre_scores_gemma":[0.8533414,0.00040167483,0.14400859,0.00009438863,0.000042401876,0.000033886645,0.00005387738,0.00007842694,0.00194527],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963045,0.0014152556,0.00012817579,0.00028877947,0.0015997399,0.0002635726],"domain_scores_gemma":[0.99182737,0.004689282,0.00045634448,0.0014675076,0.0014088348,0.00015056437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005191936,0.0009771832,0.00053916813,0.0018623911,0.00136633,0.0043920907,0.0017669104,0.0025384922,0.004841838],"category_scores_gemma":[0.013766383,0.0006773934,0.0005758703,0.0024311522,0.0026218214,0.008366873,0.0038804065,0.0010798841,0.0008311016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009409862,0.0006566458,0.061125107,0.0005705146,0.00018694924,0.0048411633,0.0025551168,0.23094329,0.037636865,0.18618335,0.0037997458,0.47056025],"study_design_scores_gemma":[0.000057171244,0.00060156826,0.022741739,0.0002509779,0.00023394829,0.005335761,0.005271201,0.8213526,0.026842734,0.08650684,0.030603016,0.00020242251],"about_ca_topic_score_codex":0.0052673095,"about_ca_topic_score_gemma":0.0099328635,"teacher_disagreement_score":0.0052673095,"about_ca_system_score_codex":0.0009147256,"about_ca_system_score_gemma":0.0015796653,"threshold_uncertainty_score":0.027457893},"labels":[],"label_agreement":null},{"id":"W1969884402","doi":"10.1016/j.autcon.2014.07.006","title":"Image dataset development for measuring construction equipment recognition performance","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Science for Equity, Empowerment and Development Division","keywords":"Excavator; Computer science; Loader; Cognitive neuroscience of visual object recognition; Artificial intelligence; Robustness (evolution); Correctness; Boom; Computer vision; Engineering; Object (grammar)","score_opus":0.015844923639709678,"score_gpt":0.21950153916391468,"score_spread":0.203656615524205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969884402","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16878231,0.0011801055,0.10505654,0.00059477583,0.00081912306,0.0038513807,0.66458887,0.0322274,0.022899544],"genre_scores_gemma":[0.05868438,0.0002641364,0.068102844,0.00021392622,0.00006326832,0.0018739116,0.86441445,0.00035853533,0.0060244896],"study_design_codex":"not_applicable","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99886227,0.00008914991,0.000118878954,0.00032912203,0.0004375561,0.00016304273],"domain_scores_gemma":[0.99851745,0.000101022284,0.00010280043,0.00040887445,0.0007453383,0.00012442803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081709307,0.0015504615,0.0007975655,0.0028863708,0.00061812194,0.0010139274,0.0017755303,0.0012373391,0.0058951722],"category_scores_gemma":[0.0020368167,0.0003086819,0.0012481005,0.0022057437,0.00030074306,0.0008901657,0.0010767571,0.0009818854,0.006635293],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011858406,0.002056311,0.028594868,0.0017288895,0.0004857281,0.00037075987,0.00012737392,0.01080417,0.07259666,0.0019479841,0.47906196,0.40103942],"study_design_scores_gemma":[0.0005630832,0.0014492547,0.26738754,0.0005159239,0.0007159776,0.0018337813,0.00075109844,0.14257428,0.19127148,0.0025698259,0.39004198,0.00032582355],"about_ca_topic_score_codex":0.01573121,"about_ca_topic_score_gemma":0.025291067,"teacher_disagreement_score":0.01573121,"about_ca_system_score_codex":0.0008148654,"about_ca_system_score_gemma":0.0013927858,"threshold_uncertainty_score":0.031279325},"labels":[],"label_agreement":null},{"id":"W1974202129","doi":"10.1016/j.autcon.2014.03.008","title":"Construction spatial modeling and scheduling with three-dimensional singularity functions","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Cartesian coordinate system; Mathematical optimization; Computer science; Singularity; Dimension (graph theory); Fourth Dimension; Mathematics; Spacetime; Geometry","score_opus":0.04101644279093249,"score_gpt":0.2994533535044828,"score_spread":0.25843691071355035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1974202129","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06803415,0.00019923493,0.9276259,0.00018106688,0.000033257827,0.000031367483,0.00010176847,0.00009993924,0.0036932924],"genre_scores_gemma":[0.9154685,0.00030991164,0.08075895,0.000038017166,0.00002902096,0.00009104967,0.00012219399,0.00005619999,0.0031261516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994393,0.00021587349,0.000033146433,0.00010649694,0.0001023306,0.00010282207],"domain_scores_gemma":[0.9987801,0.00072574656,0.00017787406,0.00006872865,0.00014588091,0.00010168427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011211759,0.0008957356,0.0014690581,0.0010083964,0.0007336711,0.0018861808,0.0015212456,0.0011003016,0.0016829129],"category_scores_gemma":[0.0032290418,0.00080594386,0.0014546327,0.0018173029,0.0016641185,0.0016023284,0.0013415675,0.0011598179,0.00023433124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013303934,0.000010229842,0.00019511451,0.000008105811,0.000004935302,0.000017789696,0.000016354788,0.982786,0.00013730365,0.015114525,0.00006900012,0.0016272488],"study_design_scores_gemma":[0.0000015097343,0.000002976683,0.000030550404,9.1148667e-7,0.0000016074594,0.000002163766,0.000003477066,0.99625623,0.000042642692,0.003584142,0.000071609014,0.0000021537523],"about_ca_topic_score_codex":0.025327278,"about_ca_topic_score_gemma":0.011092568,"teacher_disagreement_score":0.025327278,"about_ca_system_score_codex":0.0021782077,"about_ca_system_score_gemma":0.0018912309,"threshold_uncertainty_score":0.050359666},"labels":[],"label_agreement":null},{"id":"W1974942783","doi":"10.1016/j.autcon.2008.05.006","title":"Integrating 3D laser scanning and photogrammetry for progress measurement of construction work","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":243,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Photogrammetry; Laser scanning; Data collection; Work (physics); Object (grammar); Computer science; Function (biology); Computer vision; Construction engineering; Engineering; Artificial intelligence; Engineering drawing; Laser; Mechanical engineering; Mathematics; Optics","score_opus":0.030743104587348746,"score_gpt":0.23024921794151396,"score_spread":0.1995061133541652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1974942783","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1640089,0.00093530735,0.8209564,0.00013479708,0.00012596924,0.00014742317,0.0005501905,0.003390502,0.009750533],"genre_scores_gemma":[0.6905487,0.0006754194,0.30587256,0.000057840403,0.000043932672,0.00012142736,0.00035884307,0.00015463136,0.0021666118],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99735105,0.00061813137,0.00012854302,0.0002822408,0.001506062,0.000114024064],"domain_scores_gemma":[0.99839574,0.00047668957,0.00014664202,0.00029352147,0.00065005355,0.0000373702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011325171,0.00070107385,0.0005774144,0.0036958277,0.00051307445,0.0012750468,0.00063459005,0.0007514979,0.002160187],"category_scores_gemma":[0.0026405728,0.0004808352,0.0004951615,0.0046008923,0.00047400568,0.0013927307,0.0010913179,0.00042874392,0.0012812403],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027828597,0.0001524092,0.036337253,0.00035856626,0.000088928835,0.00009771058,0.0005379017,0.027926488,0.10347584,0.0037742886,0.001747001,0.82522535],"study_design_scores_gemma":[0.00008810387,0.0006455405,0.21728992,0.00018712184,0.00038110433,0.0010865342,0.0009055376,0.5054756,0.23920831,0.0081791,0.026290765,0.0002623604],"about_ca_topic_score_codex":0.007263902,"about_ca_topic_score_gemma":0.011521506,"teacher_disagreement_score":0.007263902,"about_ca_system_score_codex":0.00052967155,"about_ca_system_score_gemma":0.0012979024,"threshold_uncertainty_score":0.014443219},"labels":[],"label_agreement":null},{"id":"W1977024736","doi":"10.1016/j.autcon.2015.03.004","title":"Automated generation of shop drawings in residential construction","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council","funders":"","keywords":"Visual Basic for Applications; CAD; Building information modeling; Computer Aided Design; Parametric statistics; Engineering drawing; Automation; Process (computing); Engineering; Parametric design; Technical drawing; Information model; Parametric model; Construction engineering; Manufacturing engineering; Computer science; Software engineering; Mechanical engineering; Operations management; Scheduling (production processes)","score_opus":0.020475940774067464,"score_gpt":0.24243523356336164,"score_spread":0.22195929278929416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977024736","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1978493,0.00032883967,0.76571107,0.00019843515,0.00008319326,0.00028724226,0.0013352497,0.019123144,0.015083568],"genre_scores_gemma":[0.6129561,0.00017554007,0.38001773,0.000024025045,0.00001131382,0.000089040856,0.0018132463,0.0008061839,0.004106861],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942505,0.00017930471,0.00001892054,0.00008082982,0.00024976104,0.000046175377],"domain_scores_gemma":[0.9992716,0.00028239758,0.00004714897,0.00016297799,0.00020391862,0.00003198679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046564074,0.0006004906,0.00063759886,0.001096071,0.00049239397,0.0011337078,0.00088752416,0.0006731087,0.0071793287],"category_scores_gemma":[0.0017969803,0.0005789238,0.00055148744,0.0010640656,0.00032000465,0.00047869794,0.00081230083,0.0004640794,0.0019628026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052008417,0.00021803519,0.0050645918,0.00031583756,0.00007521439,0.0008967701,0.0008185795,0.24068044,0.024224175,0.009063348,0.015153554,0.7029694],"study_design_scores_gemma":[0.000039750747,0.00007823778,0.003073723,0.000027006196,0.000028173685,0.0002944306,0.0002826477,0.9565731,0.022262145,0.004770347,0.012542549,0.00002779817],"about_ca_topic_score_codex":0.004632976,"about_ca_topic_score_gemma":0.008137172,"teacher_disagreement_score":0.0071793287,"about_ca_system_score_codex":0.0004138673,"about_ca_system_score_gemma":0.00093269243,"threshold_uncertainty_score":0.024017215},"labels":[],"label_agreement":null},{"id":"W1995811343","doi":"10.1016/j.autcon.2010.11.009","title":"Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring","year":2010,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":37,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Science Foundation","keywords":"Computer science; Identification (biology); Rotation formalisms in three dimensions; Data mining; Sensor fusion; Set (abstract data type); Data set; Data source; Data integration; Machine learning; Artificial intelligence","score_opus":0.053451535629883674,"score_gpt":0.32983641529588603,"score_spread":0.27638487966600234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1995811343","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018798099,0.00009042646,0.9945623,0.00039492964,0.000028656941,0.00018235874,0.0003459591,0.0015024868,0.0010130047],"genre_scores_gemma":[0.08500641,0.00029578863,0.911052,0.00034134614,0.00005746403,0.00045344717,0.0014675927,0.00043050293,0.0008953658],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98766696,0.0038385454,0.0026346133,0.0014425005,0.0038019237,0.00061545597],"domain_scores_gemma":[0.97434956,0.010740129,0.0016228459,0.009212168,0.0036007087,0.000474565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022593413,0.0009880267,0.0017111176,0.0059573855,0.0023633486,0.010241818,0.004210747,0.0026411014,0.0029840488],"category_scores_gemma":[0.040438775,0.0017831704,0.004171536,0.005296483,0.0037471806,0.012541341,0.006874298,0.005035614,0.0011074656],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019173567,0.0002845143,0.002507738,0.0004713822,0.00027720563,0.0007197384,0.0028323377,0.029817257,0.007011126,0.83847374,0.008969921,0.10844334],"study_design_scores_gemma":[0.00009027157,0.0000477982,0.0007856117,0.00037654198,0.00029687368,0.00044025597,0.0006776382,0.31644738,0.015561762,0.6217259,0.043397,0.00015291719],"about_ca_topic_score_codex":0.011764663,"about_ca_topic_score_gemma":0.015553627,"teacher_disagreement_score":0.022593413,"about_ca_system_score_codex":0.0027617062,"about_ca_system_score_gemma":0.005787993,"threshold_uncertainty_score":0.11948681},"labels":[],"label_agreement":null},{"id":"W1997159502","doi":"10.1016/j.autcon.2004.02.004","title":"A CAD-based model for site planning","year":2004,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"CAD; Interconnectivity; Computer Aided Design; Interface (matter); Engineering drawing; Object (grammar); Feature (linguistics); Set (abstract data type); Computer science; Engineering; Artificial intelligence; Programming language","score_opus":0.013572251697161742,"score_gpt":0.23587580195922345,"score_spread":0.2223035502620617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997159502","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050877235,0.00024862122,0.9772735,0.0001750245,0.0000656586,0.00007271752,0.0013641677,0.0012557182,0.014456807],"genre_scores_gemma":[0.27413225,0.0012072364,0.6998644,0.00010868112,0.00003555687,0.00043906603,0.00398946,0.0004539491,0.019769426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972004,0.00003860992,0.000023360284,0.00004371036,0.00015354517,0.000020774749],"domain_scores_gemma":[0.9997937,0.000058593167,0.000015693726,0.000041238964,0.00007625158,0.000014522062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002639936,0.00062639173,0.0006533356,0.0010426049,0.00048581988,0.0020917002,0.0015390143,0.0013235675,0.009612783],"category_scores_gemma":[0.0009600249,0.0007113615,0.0010084651,0.0016719206,0.00059897354,0.0011576617,0.00068009726,0.00077993295,0.003482223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028557946,0.000032243734,0.00041155558,0.00010326589,0.00001700205,0.00014856523,0.00007674296,0.89564496,0.002094809,0.053211223,0.0030409335,0.045190122],"study_design_scores_gemma":[0.000008578466,0.000010191038,0.00014505294,0.000017735829,0.00001228074,0.00006020634,0.000014646377,0.9738582,0.00094685814,0.011003164,0.013911332,0.000011744253],"about_ca_topic_score_codex":0.017793404,"about_ca_topic_score_gemma":0.025451263,"teacher_disagreement_score":0.017793404,"about_ca_system_score_codex":0.0009139342,"about_ca_system_score_gemma":0.0014351631,"threshold_uncertainty_score":0.035379708},"labels":[],"label_agreement":null},{"id":"W1999993274","doi":"10.1016/j.autcon.2007.09.001","title":"Automated retrieval of 3D CAD model objects in construction range images","year":2007,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":277,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Canada Research Chairs; National Science Foundation","keywords":"CAD; Point cloud; Computer science; Field (mathematics); Context (archaeology); Automation; Computer Aided Design; Artificial intelligence; Computer vision; Engineering drawing; Data mining; Engineering","score_opus":0.015201356686651873,"score_gpt":0.24191879927206225,"score_spread":0.22671744258541038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999993274","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31783724,0.0029706724,0.6502595,0.0002907312,0.00014098544,0.00029212752,0.0026143438,0.01428412,0.011310245],"genre_scores_gemma":[0.5979128,0.0017507129,0.3844447,0.00012697007,0.00008057826,0.00014761985,0.0070774476,0.0006218927,0.007837274],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999468,0.000052402513,0.000023293182,0.00007644601,0.0003120665,0.000067799796],"domain_scores_gemma":[0.9995921,0.000092224174,0.000043197364,0.000113121896,0.0001376866,0.000021674708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029033545,0.000669443,0.0009358551,0.0039424435,0.00045632743,0.0015428138,0.00074481213,0.00086764153,0.0029012687],"category_scores_gemma":[0.0011158165,0.00048531932,0.0006194686,0.0023192985,0.00033335475,0.0009833243,0.00085554965,0.00032012703,0.00264838],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043193635,0.00017244852,0.004727512,0.0003290031,0.00006749974,0.0003823041,0.00024362151,0.01356392,0.2257109,0.0017203499,0.009446196,0.74320436],"study_design_scores_gemma":[0.00010049246,0.00030224354,0.06423622,0.00010723658,0.0002412432,0.0027952257,0.0006900962,0.56568223,0.3184335,0.0037870759,0.043510947,0.00011357733],"about_ca_topic_score_codex":0.005809424,"about_ca_topic_score_gemma":0.007494309,"teacher_disagreement_score":0.005809424,"about_ca_system_score_codex":0.00041805697,"about_ca_system_score_gemma":0.0007792309,"threshold_uncertainty_score":0.011551201},"labels":[],"label_agreement":null},{"id":"W2000118605","doi":"10.1016/j.autcon.2010.10.002","title":"On-site visualization of building component erection enabled by integration of four-dimensional modeling and automated surveying","year":2011,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Component (thermodynamics); Building model; Software; Visualization; Model building; Position (finance); Computer science; Orientation (vector space); Controller (irrigation); Engineering; Simulation; Data mining","score_opus":0.02104407410854345,"score_gpt":0.23569148847566906,"score_spread":0.21464741436712562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000118605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56765276,0.0006196671,0.38442847,0.0005891176,0.00014551003,0.00011304592,0.0028886357,0.02582641,0.017736401],"genre_scores_gemma":[0.8837783,0.00033971222,0.11182409,0.000058513517,0.00002497884,0.000049601276,0.0010449289,0.00057954306,0.0023002867],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999778,0.00003347246,0.000007876989,0.000025882291,0.00011757432,0.000037235255],"domain_scores_gemma":[0.99957436,0.00013916174,0.000035731442,0.00009776602,0.00010953327,0.00004344982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029713975,0.0006161891,0.0006903063,0.0012064518,0.00023855534,0.0010564774,0.000572543,0.00056151353,0.007885379],"category_scores_gemma":[0.0005698017,0.00035889022,0.00037159136,0.0011851962,0.00022681271,0.00062229164,0.0010148252,0.0006836649,0.000606264],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014350679,0.0006158623,0.01919531,0.0009260305,0.00019181402,0.001176014,0.002206748,0.10840121,0.34311244,0.006200927,0.023734154,0.49280438],"study_design_scores_gemma":[0.000120356475,0.0001851268,0.052671123,0.00011062905,0.00009970788,0.0007442152,0.0008115107,0.8124312,0.104445785,0.0049393475,0.023264684,0.00017632876],"about_ca_topic_score_codex":0.0031101156,"about_ca_topic_score_gemma":0.006971846,"teacher_disagreement_score":0.007885379,"about_ca_system_score_codex":0.00023811699,"about_ca_system_score_gemma":0.00057461363,"threshold_uncertainty_score":0.026379168},"labels":[],"label_agreement":null},{"id":"W2000586020","doi":"10.1016/j.autcon.2011.04.006","title":"Incorporating rework into construction schedule analysis","year":2011,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":57,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Schedule; Reliability engineering; Computer science; Operations management; Operations research; Engineering","score_opus":0.08608231913367637,"score_gpt":0.34580600086174007,"score_spread":0.2597236817280637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000586020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15971503,0.00018352247,0.82912946,0.00014636907,0.00008061866,0.0001913416,0.00014902609,0.0014513774,0.008953196],"genre_scores_gemma":[0.67297024,0.00011927992,0.3226633,0.00002551229,0.000034978282,0.00010276278,0.00024046963,0.00027817354,0.0035652388],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985057,0.0007224574,0.000086012384,0.0001734326,0.00040073338,0.000111613044],"domain_scores_gemma":[0.9899303,0.006482123,0.0008630409,0.0012187635,0.0013631812,0.00014256366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002212222,0.0007085739,0.0007098879,0.0023897022,0.0006417851,0.001443738,0.0009583082,0.00058166793,0.0036110003],"category_scores_gemma":[0.01552358,0.0006815257,0.0007190679,0.0014900437,0.00042312313,0.0020779488,0.0006609786,0.00088628277,0.000548342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017017133,0.00021773217,0.012810104,0.00013922849,0.000136999,0.0001793715,0.00051898166,0.6321563,0.0040283566,0.012362417,0.0012175378,0.33606282],"study_design_scores_gemma":[0.000013636943,0.00009792611,0.0049520996,0.00002330423,0.000042225445,0.000047697984,0.00019512449,0.97901857,0.0027805823,0.009842651,0.0029580577,0.000028111528],"about_ca_topic_score_codex":0.017180253,"about_ca_topic_score_gemma":0.025690204,"teacher_disagreement_score":0.017180253,"about_ca_system_score_codex":0.0009443882,"about_ca_system_score_gemma":0.0016914787,"threshold_uncertainty_score":0.034160554},"labels":[],"label_agreement":null},{"id":"W2002676289","doi":"10.1016/j.autcon.2012.04.018","title":"A self-evolutionary model for automated innovation of construction technologies","year":2012,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Design Education and Practice","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Fonds de Recherche du Québec - Santé; National Science Council","keywords":"Function (biology); Genetic algorithm; Computer science; Tree (set theory); Engineering; Emerging technologies; Industrial engineering; Data science; Knowledge management; Artificial intelligence; Machine learning","score_opus":0.020817523354502373,"score_gpt":0.2734403517995442,"score_spread":0.2526228284450418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2002676289","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17474495,0.000518511,0.7108966,0.0018093878,0.000065821834,0.00012310948,0.00013806752,0.00016931364,0.11153426],"genre_scores_gemma":[0.92124075,0.000444337,0.058400843,0.00009678173,0.000028834984,0.0001330197,0.000084463805,0.00004286128,0.019528074],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940586,0.00025410435,0.00002143792,0.00010077802,0.00013090966,0.0000868254],"domain_scores_gemma":[0.9988533,0.0006398976,0.000118166245,0.00013624543,0.0001594097,0.00009292355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007935725,0.0004264332,0.0004612331,0.0009569369,0.0010102941,0.0021722545,0.0017000329,0.0018312738,0.006186431],"category_scores_gemma":[0.003230635,0.00032569966,0.0008204225,0.0010040901,0.0019989708,0.0029121283,0.0011932065,0.0008347577,0.00064062705],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019236724,0.000050199207,0.0010652229,0.000037858827,0.000024298904,0.00017370158,0.00041918794,0.18925443,0.00092395034,0.7964883,0.00055239745,0.0109913],"study_design_scores_gemma":[0.000023032648,0.000050419312,0.00052994594,0.00001552699,0.000015512307,0.00014128571,0.00015423779,0.6649736,0.00020481434,0.33019805,0.00367709,0.000016533535],"about_ca_topic_score_codex":0.0041953833,"about_ca_topic_score_gemma":0.0026490137,"teacher_disagreement_score":0.006186431,"about_ca_system_score_codex":0.001348953,"about_ca_system_score_gemma":0.0011669969,"threshold_uncertainty_score":0.020695627},"labels":[],"label_agreement":null},{"id":"W2005506411","doi":"10.1016/j.autcon.2011.04.007","title":"Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects","year":2011,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Fiscal Policy and Economic Growth","field":"Economics, Econometrics and Finance","cited_by":134,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sustainability; Work (physics); Transportation infrastructure; Sustainable development; Commission; Transport engineering; Performance indicator; Engineering; Environmental resource management; Environmental economics; Business; Environmental planning; Environmental science; Economics","score_opus":0.02617692659712794,"score_gpt":0.23147966594185906,"score_spread":0.20530273934473112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005506411","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99277675,0.0000563076,0.0015263888,0.0005360809,0.000031950833,0.000031041316,0.0004723655,0.000040460804,0.004528557],"genre_scores_gemma":[0.99888796,0.000042003936,0.00047821875,0.000023279397,0.000004315505,0.000016757833,0.00014268195,0.000005637758,0.0003992548],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99917185,0.0004280283,0.000038827144,0.0000832254,0.00004482324,0.0002333491],"domain_scores_gemma":[0.9940001,0.0043168473,0.00054747215,0.00023531175,0.00032826827,0.00057207345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020407205,0.00081212935,0.00071659184,0.00080192805,0.0006097453,0.0016217383,0.001272173,0.0031436398,0.0049146875],"category_scores_gemma":[0.007633709,0.00068075676,0.0012017693,0.0014738882,0.0011361596,0.001501068,0.0008456547,0.0021732594,0.0002397593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017209865,0.00013360789,0.0028995255,0.000012117161,0.000023087077,0.000044840872,0.000023256394,0.9935376,0.00016329237,0.0020935948,0.00022133802,0.00067561376],"study_design_scores_gemma":[0.00014704849,0.00015787137,0.0024213896,0.0000067831766,0.000029408127,0.000007710566,0.00013430852,0.99381363,0.0003020066,0.002699576,0.00026283495,0.000017529574],"about_ca_topic_score_codex":0.05856381,"about_ca_topic_score_gemma":0.04063396,"teacher_disagreement_score":0.05856381,"about_ca_system_score_codex":0.0038998984,"about_ca_system_score_gemma":0.0023912794,"threshold_uncertainty_score":0.11644584},"labels":[],"label_agreement":null},{"id":"W2005915515","doi":"10.1016/j.autcon.2014.06.001","title":"Automating motion trajectory Of crane-lifted loads","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Payload (computing); Rotation (mathematics); Trajectory; Computer science; Path (computing); Lift (data mining); Constant (computer programming); Control theory (sociology); Translation (biology); Function (biology); Motion (physics); Simulation; Artificial intelligence; Physics; Control (management)","score_opus":0.005433267552173013,"score_gpt":0.1955430761779907,"score_spread":0.19010980862581767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005915515","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2709782,0.00015417907,0.7160093,0.00007935823,0.000047028912,0.00013340478,0.00034108298,0.003711484,0.008545849],"genre_scores_gemma":[0.91481715,0.00010032515,0.08066868,0.000012535939,0.000005325869,0.000053015672,0.0004103074,0.00011870719,0.0038138388],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982315,0.000016433929,0.000004973858,0.00004791972,0.00007396704,0.000033496453],"domain_scores_gemma":[0.99986005,0.0000211309,0.000017001725,0.000029007644,0.00005815114,0.000014619326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019261536,0.0005925987,0.00040276293,0.00064954156,0.0006745032,0.00038354474,0.0004320329,0.00036178468,0.0030763727],"category_scores_gemma":[0.0005112082,0.00029996992,0.00025525744,0.00046260667,0.00024355402,0.0004046014,0.0007184504,0.00041796235,0.0010738745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005738426,0.00011954364,0.007159751,0.00024970758,0.000047044094,0.00037787698,0.00074051495,0.28844234,0.12431727,0.005367261,0.0035697652,0.56903505],"study_design_scores_gemma":[0.000018241952,0.00009635315,0.008308055,0.000021882199,0.000013540632,0.00009830331,0.00019572818,0.95125055,0.03415686,0.0013185643,0.0045022937,0.000019606941],"about_ca_topic_score_codex":0.014237603,"about_ca_topic_score_gemma":0.015841309,"teacher_disagreement_score":0.014237603,"about_ca_system_score_codex":0.0003470077,"about_ca_system_score_gemma":0.0011541278,"threshold_uncertainty_score":0.028309464},"labels":[],"label_agreement":null},{"id":"W2009471830","doi":"10.1016/j.autcon.2015.03.006","title":"Optimization-based excavator pose estimation using real-time location systems","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":111,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"WorkSafeBC","keywords":"Excavator; Earthworks; Identification (biology); Engineering; Computer science; Estimation; Real-time computing; Reliability engineering; Systems engineering; Civil engineering","score_opus":0.09144097384116828,"score_gpt":0.44557209618766075,"score_spread":0.35413112234649247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009471830","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05498578,0.00018107535,0.9423624,0.00007008252,0.00005258358,0.0000243921,0.00008706437,0.0010584356,0.0011781646],"genre_scores_gemma":[0.79549426,0.00017032298,0.20087993,0.00005526868,0.00004820767,0.00007401778,0.00034950807,0.00012264792,0.002805797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995028,0.000092537135,0.000025393385,0.00016269978,0.00015447769,0.00006220511],"domain_scores_gemma":[0.99944156,0.00017446847,0.00010533648,0.00007567814,0.00017001832,0.000032979773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036996015,0.00087073905,0.0011220932,0.0007220219,0.00034101598,0.00068559655,0.00078596995,0.0007183361,0.0018836958],"category_scores_gemma":[0.0014261445,0.00065808283,0.0006265625,0.00091748737,0.0003364134,0.0007915447,0.00078962254,0.0005999958,0.0009203263],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042656512,0.0001751439,0.0036490732,0.00012207743,0.00012326214,0.000116374285,0.00013041084,0.62213856,0.035530932,0.00081533095,0.0016556163,0.33511674],"study_design_scores_gemma":[0.000014125936,0.000057039364,0.0022500923,0.0000053797576,0.000014211604,0.000045112472,0.000020912967,0.9929598,0.0037535585,0.0002635452,0.0006034289,0.00001283947],"about_ca_topic_score_codex":0.0053858166,"about_ca_topic_score_gemma":0.007538727,"teacher_disagreement_score":0.0053858166,"about_ca_system_score_codex":0.00027233138,"about_ca_system_score_gemma":0.000833218,"threshold_uncertainty_score":0.010708928},"labels":[],"label_agreement":null},{"id":"W2014398890","doi":"10.1016/j.autcon.2014.12.001","title":"FabPod: Designing with temporal flexibility &amp; relationships to mass-customisation","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Design Education and Practice","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Australian Research Council; RMIT University","keywords":"Workflow; Systems engineering; Flexibility (engineering); Key (lock); Mass customization; Computer science; Workflow technology; Engineering; Software engineering; Workflow engine; Manufacturing engineering; Process management; Personalization; World Wide Web; Database","score_opus":0.0875286819364455,"score_gpt":0.2961420525999075,"score_spread":0.208613370663462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2014398890","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03371408,0.00044636664,0.8605638,0.0007364252,0.0000746411,0.000063871325,0.00009330352,0.0020528536,0.102254614],"genre_scores_gemma":[0.6536451,0.0004886591,0.31663126,0.00022834912,0.00004055537,0.0001198999,0.00013614507,0.0007692002,0.027940864],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99864465,0.0005723005,0.00006242078,0.0002698823,0.00035490684,0.00009593663],"domain_scores_gemma":[0.9964405,0.002015088,0.00028213725,0.00089965225,0.00022181033,0.0001408833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019657996,0.0007098169,0.00026354796,0.0010002118,0.0012521053,0.0043732747,0.0012313325,0.0012730628,0.01335214],"category_scores_gemma":[0.0073950887,0.0006722619,0.00057508954,0.0010204221,0.0047743726,0.005797242,0.0033924342,0.0017414694,0.0015777135],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018626727,0.00007904326,0.0019605092,0.00027207567,0.000020330717,0.00041828147,0.006898555,0.022723613,0.009063816,0.7565516,0.0037705153,0.19805545],"study_design_scores_gemma":[0.000066095636,0.00024641366,0.0022568756,0.000265503,0.00007878636,0.001966133,0.0031402989,0.12819245,0.029097807,0.59792566,0.23663153,0.00013237313],"about_ca_topic_score_codex":0.0015735344,"about_ca_topic_score_gemma":0.0018300228,"teacher_disagreement_score":0.01335214,"about_ca_system_score_codex":0.0010055193,"about_ca_system_score_gemma":0.0007359493,"threshold_uncertainty_score":0.044667304},"labels":[],"label_agreement":null},{"id":"W2015404834","doi":"10.1016/j.autcon.2010.07.017","title":"Multisensor data fusion for on-site materials tracking in construction","year":2010,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":100,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Robustness (evolution); Sensor fusion; Computer science; Scalability; Inefficiency; Data mining; Real-time computing; Engineering; Artificial intelligence; Database","score_opus":0.12729317370367982,"score_gpt":0.4983116293582912,"score_spread":0.3710184556546114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015404834","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38057238,0.0010951913,0.6098162,0.0003130468,0.0002828363,0.000068572226,0.0007023436,0.0016366648,0.005512856],"genre_scores_gemma":[0.91932803,0.00035468113,0.07695436,0.00008135501,0.000061210245,0.000047282883,0.00052450877,0.00007009034,0.002578422],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99942744,0.000110930145,0.000022035596,0.00011794585,0.00025420947,0.000067464876],"domain_scores_gemma":[0.9996648,0.000097927346,0.00004933892,0.000052950403,0.00011333043,0.000021721977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005843212,0.00064980227,0.00096035196,0.0013703208,0.00044607103,0.0008047267,0.00065999344,0.0009528134,0.0015492123],"category_scores_gemma":[0.0009731227,0.00038322818,0.00060545275,0.0014457267,0.00028653126,0.0010770541,0.0009741102,0.00055023783,0.0006297733],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014317932,0.0005851334,0.01711341,0.00041824937,0.00021758003,0.00020927422,0.00046341418,0.09231108,0.19531071,0.001586421,0.0048077516,0.68554515],"study_design_scores_gemma":[0.000059819937,0.00035591767,0.046673667,0.000043712098,0.00017668639,0.00023609071,0.00031707957,0.875545,0.06819504,0.0034393102,0.004874682,0.000083039085],"about_ca_topic_score_codex":0.0028683532,"about_ca_topic_score_gemma":0.004481714,"teacher_disagreement_score":0.0028683532,"about_ca_system_score_codex":0.00034320657,"about_ca_system_score_gemma":0.00048577195,"threshold_uncertainty_score":0.00570333},"labels":[],"label_agreement":null},{"id":"W2019060119","doi":"10.1016/j.autcon.2008.08.001","title":"Visualizing high-rise building construction strategies using linear scheduling and 4D CAD","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Scheduling (production processes); Computer science; Visualization; CAD; Project management; Software engineering; Systems engineering; Industrial engineering; Engineering; Engineering drawing; Operations management; Artificial intelligence","score_opus":0.0170725969977628,"score_gpt":0.2583357278586067,"score_spread":0.2412631308608439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019060119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3853173,0.0005729191,0.5764759,0.00071846927,0.00012503307,0.00021236797,0.0015471332,0.008249111,0.026781771],"genre_scores_gemma":[0.7839554,0.00041790275,0.2100412,0.000055087483,0.00002370289,0.00010223211,0.00049595174,0.0005421665,0.0043663695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998561,0.00003091725,0.000007754992,0.000018693301,0.000050424092,0.00003610555],"domain_scores_gemma":[0.9996216,0.00019319911,0.000034769357,0.000039252278,0.000057122732,0.000054029308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027754073,0.0009276921,0.0004728245,0.0012390877,0.0003519942,0.0012779289,0.0006250961,0.000577188,0.013285335],"category_scores_gemma":[0.00062602863,0.00058991736,0.00050575443,0.0013551745,0.00041343705,0.0006255157,0.0006424127,0.00065391714,0.0007661606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096072257,0.00050300854,0.006120149,0.00059664826,0.000086075874,0.0005790267,0.0018330686,0.71177137,0.07051379,0.023057723,0.007825032,0.17615333],"study_design_scores_gemma":[0.00008512747,0.00012872017,0.0036773821,0.000039352348,0.000029734896,0.00010994461,0.0004682625,0.970456,0.012612246,0.0054619648,0.0068650246,0.00006623553],"about_ca_topic_score_codex":0.0092525575,"about_ca_topic_score_gemma":0.014888385,"teacher_disagreement_score":0.013285335,"about_ca_system_score_codex":0.0007526686,"about_ca_system_score_gemma":0.0012531888,"threshold_uncertainty_score":0.044443905},"labels":[],"label_agreement":null},{"id":"W2024518390","doi":"10.1016/j.autcon.2005.07.005","title":"A semantic framework to support corporate memory management in building construction","year":2005,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":58,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Taxonomy (biology); Ontology; Knowledge representation and reasoning; Knowledge management; Domain (mathematical analysis); Semantic Web; Data science; Information retrieval; Artificial intelligence","score_opus":0.022819166576489008,"score_gpt":0.2757474928056161,"score_spread":0.2529283262291271,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024518390","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00812401,0.00030714314,0.9787533,0.00063503854,0.000068655354,0.00013517399,0.0002955074,0.0029637825,0.008717378],"genre_scores_gemma":[0.14339848,0.0005304085,0.8512119,0.00016257726,0.000052043946,0.00017123569,0.0010909677,0.00032576456,0.0030567443],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986072,0.00032611025,0.00022057223,0.00022146107,0.00046892118,0.00015578793],"domain_scores_gemma":[0.99895203,0.00025618152,0.00009413236,0.00037255534,0.0002203336,0.000104802435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002661138,0.00060030405,0.0007748075,0.002859801,0.0022363341,0.0056262226,0.0023222056,0.0020810359,0.0024531225],"category_scores_gemma":[0.0032324705,0.0006847839,0.0016860001,0.0029166415,0.0026591201,0.0083429,0.003062035,0.001953733,0.00085730257],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007800034,0.00019341684,0.0011959545,0.00019907109,0.000062660096,0.0003665833,0.0017214109,0.029104175,0.0031252743,0.8488033,0.007728187,0.107421964],"study_design_scores_gemma":[0.00005966789,0.000065905515,0.0008455503,0.00032490114,0.00024806298,0.00059580413,0.0010234666,0.31330445,0.008918846,0.49111256,0.18339834,0.000102493286],"about_ca_topic_score_codex":0.014804424,"about_ca_topic_score_gemma":0.021004636,"teacher_disagreement_score":0.014804424,"about_ca_system_score_codex":0.0015832704,"about_ca_system_score_gemma":0.0031357568,"threshold_uncertainty_score":0.029436529},"labels":[],"label_agreement":null},{"id":"W2028343055","doi":"10.1016/j.autcon.2009.03.004","title":"Developing a knowledge management system for improved value engineering practices in the construction industry","year":2009,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":140,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Creativity; Schema (genetic algorithms); Scope (computer science); Knowledge management; Engineering; Sample (material); Process (computing); Domain (mathematical analysis); Computer science; Mathematics; Psychology","score_opus":0.02099009425758359,"score_gpt":0.2576317765925646,"score_spread":0.236641682334981,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028343055","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25592208,0.00024924104,0.6699078,0.0022745167,0.00019146202,0.0014465089,0.00089892204,0.04871483,0.020394623],"genre_scores_gemma":[0.49966845,0.00022580725,0.4884934,0.00039266518,0.00006930139,0.00052353105,0.002181441,0.0005568104,0.007888629],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99868196,0.00029725075,0.00023688546,0.0002799724,0.00040278822,0.000101149715],"domain_scores_gemma":[0.9948774,0.002139974,0.0004280087,0.0008813725,0.0013786478,0.00029465687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034417,0.00038530858,0.0004416864,0.0025877256,0.0012172172,0.0036108422,0.0013219417,0.0014617522,0.0029891673],"category_scores_gemma":[0.008108931,0.0003959783,0.00040668008,0.0019881064,0.00047879765,0.0044113677,0.0019090262,0.0010299167,0.0011227877],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058146915,0.002082197,0.020890392,0.00032523577,0.00013561775,0.00077037397,0.0034003044,0.012902044,0.031109342,0.013817987,0.020720918,0.89326406],"study_design_scores_gemma":[0.00066077255,0.0010526648,0.040283743,0.0004862423,0.0008370555,0.0012350897,0.0027794265,0.6317732,0.162954,0.023892539,0.13361238,0.0004328793],"about_ca_topic_score_codex":0.0070598065,"about_ca_topic_score_gemma":0.0055796183,"teacher_disagreement_score":0.0070598065,"about_ca_system_score_codex":0.0014939735,"about_ca_system_score_gemma":0.002909163,"threshold_uncertainty_score":0.018201709},"labels":[],"label_agreement":null},{"id":"W2030212035","doi":"10.1016/j.autcon.2012.12.004","title":"Building Information Modeling (BIM) partnering framework for public construction projects","year":2013,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":473,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Department for Business, Innovation and Skills","keywords":"Building information modeling; Procurement; Rework; Construction industry; Integrated project delivery; Construction management; Productivity; Competition (biology); Pre-construction services; Process management; Project management; Business; Construction engineering; Engineering; Operations management; Project planning; Systems engineering; Marketing; Civil engineering","score_opus":0.022112080141336317,"score_gpt":0.24119654176182134,"score_spread":0.21908446162048503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030212035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007859994,0.00029487262,0.96347725,0.00046333048,0.000051369952,0.00022483806,0.0017728484,0.0077572907,0.018098189],"genre_scores_gemma":[0.20593457,0.0008312642,0.77828246,0.00015234642,0.000029673562,0.0006103922,0.007839849,0.0007904084,0.005528992],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9975407,0.00074785156,0.00021277615,0.00022545578,0.0010248274,0.0002484779],"domain_scores_gemma":[0.9991573,0.00015701674,0.00008506019,0.0002710376,0.00023435194,0.00009514531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032515484,0.00084655645,0.0009214683,0.0029345723,0.0012902447,0.0039547365,0.0024363562,0.0014478099,0.0049781017],"category_scores_gemma":[0.0031728563,0.0005375107,0.0011994763,0.004004435,0.000697337,0.0033503168,0.00444438,0.0013818877,0.0017312322],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011233111,0.00032517896,0.0028305408,0.00042669618,0.000106413216,0.00047427983,0.0014072699,0.15994,0.0043093143,0.5074927,0.03112186,0.29145327],"study_design_scores_gemma":[0.00004879287,0.00008921927,0.0019497088,0.00038583358,0.00013087584,0.00048412054,0.001162845,0.49216905,0.009067044,0.20750147,0.28688827,0.00012270879],"about_ca_topic_score_codex":0.0126655465,"about_ca_topic_score_gemma":0.018366255,"teacher_disagreement_score":0.0126655465,"about_ca_system_score_codex":0.0015424847,"about_ca_system_score_gemma":0.004166812,"threshold_uncertainty_score":0.025183618},"labels":[],"label_agreement":null},{"id":"W2031530648","doi":"10.1016/j.autcon.2012.08.004","title":"Comparative visualization of construction schedules","year":2012,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Data Visualization and Analytics","field":"Computer Science","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of British Columbia; University of Victoria","funders":"","keywords":"Gantt chart; Schedule; Computer science; Visualization; Flexibility (engineering); Project management; Software; Operations research; Software engineering; Systems engineering; Data mining; Engineering","score_opus":0.03226052099126875,"score_gpt":0.3339316170395943,"score_spread":0.30167109604832554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031530648","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5637264,0.0016386046,0.26362333,0.002176114,0.0002945935,0.00015556999,0.012271182,0.00872028,0.14739391],"genre_scores_gemma":[0.9179822,0.00063037034,0.07129408,0.000030252788,0.000053486216,0.00007777665,0.0028862208,0.0008477963,0.0061976793],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956685,0.00016145369,0.0000269905,0.00006041231,0.00013358852,0.0000506981],"domain_scores_gemma":[0.99590826,0.002104616,0.00031364083,0.000606393,0.00090759184,0.00015940495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007447774,0.00044730943,0.00035138518,0.003958634,0.00058400445,0.0024109993,0.00048672283,0.0005041197,0.018906295],"category_scores_gemma":[0.0059050196,0.00032590528,0.00040923667,0.0047887475,0.00038873256,0.001375606,0.00087404373,0.0007201573,0.0012791101],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017789506,0.00026080266,0.043039925,0.0012853941,0.00013162121,0.0005779779,0.016210582,0.11826421,0.025377078,0.23087877,0.04146297,0.5207317],"study_design_scores_gemma":[0.00020145012,0.00044359642,0.17865482,0.0006736074,0.00025923632,0.00069360284,0.012414735,0.42994294,0.023424886,0.10812979,0.24492176,0.00023961265],"about_ca_topic_score_codex":0.009336094,"about_ca_topic_score_gemma":0.011153597,"teacher_disagreement_score":0.018906295,"about_ca_system_score_codex":0.0008236918,"about_ca_system_score_gemma":0.0010292752,"threshold_uncertainty_score":0.06324786},"labels":[],"label_agreement":null},{"id":"W2032983490","doi":"10.1016/j.autcon.2015.02.009","title":"Competitive intelligence (CI) for evaluation of construction contractors","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Competitive and Knowledge Intelligence","field":"Business, Management and Accounting","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Vale (Canada); University of Waterloo","funders":"","keywords":"Construction industry; Engineering; Construction engineering; Engineering management; Operations management; Business; Computer science","score_opus":0.06986420806897069,"score_gpt":0.31624738387810525,"score_spread":0.24638317580913455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2032983490","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70075107,0.002771536,0.034261312,0.0008492841,0.0004564977,0.0025762266,0.004091155,0.0005243006,0.25371867],"genre_scores_gemma":[0.9867764,0.00016252843,0.009118372,0.000081275575,0.000049951665,0.0005565408,0.0007749189,0.000020537125,0.0024594986],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9681445,0.010471881,0.0017835919,0.0011042187,0.016852353,0.001643498],"domain_scores_gemma":[0.9362076,0.025287235,0.0048339353,0.0030013213,0.02740202,0.00326783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018349133,0.001139166,0.00084215193,0.015923733,0.0020265481,0.0048770765,0.0016586509,0.0017104091,0.006367778],"category_scores_gemma":[0.056586076,0.00019397053,0.0011777545,0.009767291,0.0012444028,0.002528255,0.0022880621,0.0011975202,0.0012136295],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030406879,0.002166779,0.570949,0.0007789287,0.0003999583,0.00031484442,0.0035554683,0.009306026,0.0036069858,0.036695756,0.013209933,0.3559755],"study_design_scores_gemma":[0.00043811073,0.006935211,0.7702129,0.0007204261,0.0008846417,0.0012391113,0.013857869,0.13230337,0.02030624,0.020152237,0.032532148,0.00041771773],"about_ca_topic_score_codex":0.018920993,"about_ca_topic_score_gemma":0.018652134,"teacher_disagreement_score":0.018920993,"about_ca_system_score_codex":0.0053559598,"about_ca_system_score_gemma":0.0059018494,"threshold_uncertainty_score":0.09704059},"labels":[],"label_agreement":null},{"id":"W2045216131","doi":"10.1016/j.autcon.2005.12.002","title":"Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot","year":2006,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Robot; Clearing; Control engineering; Computer science; Control (management); Simulation; Engineering; Artificial intelligence; Business","score_opus":0.011480873834064202,"score_gpt":0.22435559485731763,"score_spread":0.21287472102325342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045216131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041889805,0.00010150542,0.94761753,0.00016666546,0.000050865296,0.000094278934,0.00008215222,0.001823376,0.0081737805],"genre_scores_gemma":[0.9469111,0.00010171396,0.048075613,0.000047640377,0.000009572357,0.00019948842,0.00008687073,0.00011666224,0.0044512628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963665,0.00012110214,0.000016616019,0.000051133422,0.00013248577,0.000041989544],"domain_scores_gemma":[0.99953175,0.00021993312,0.000064586326,0.000043191416,0.00011020861,0.000030309884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054006564,0.00067611603,0.00072117883,0.0004449388,0.00056066585,0.001037864,0.0012023287,0.0011652951,0.0044038934],"category_scores_gemma":[0.0011029253,0.00048069062,0.000777977,0.0002746929,0.0007257848,0.00053826516,0.0007788267,0.0006498521,0.0005464074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006461069,0.000018079252,0.0001409816,0.000024883379,0.000008715915,0.000041861415,0.000041457137,0.98894775,0.0027712388,0.002868775,0.00014894702,0.0049227155],"study_design_scores_gemma":[0.000012308804,0.000019782135,0.00005174758,0.000002957682,0.0000053991166,0.000005361179,0.000004159762,0.998166,0.000854332,0.000497044,0.00037782567,0.0000030813123],"about_ca_topic_score_codex":0.010553401,"about_ca_topic_score_gemma":0.007260351,"teacher_disagreement_score":0.010553401,"about_ca_system_score_codex":0.00064668816,"about_ca_system_score_gemma":0.00089411036,"threshold_uncertainty_score":0.020983934},"labels":[],"label_agreement":null},{"id":"W2051362214","doi":"10.1016/j.autcon.2011.06.002","title":"Improving laser image resolution for pitting corrosion measurement using Markov random field method","year":2011,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Image Processing Techniques and Applications","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"National Research Council; American Water Works Association Research Foundation; Water Research Foundation","keywords":"Interpolation (computer graphics); Resolution (logic); Markov random field; Image resolution; Computer science; Laser; Computer vision; Artificial intelligence; Markov chain; Algorithm; Image (mathematics); Optics; Physics; Image segmentation","score_opus":0.030320830681184716,"score_gpt":0.2742345012034965,"score_spread":0.2439136705223118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051362214","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04482311,0.0001635411,0.9538743,0.000069653666,0.000016990858,0.000016721951,0.000033387227,0.00052957714,0.00047268512],"genre_scores_gemma":[0.5978862,0.00025130497,0.40078306,0.00006547734,0.000029486673,0.00004423309,0.00009050448,0.00007565012,0.00077400776],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938905,0.00014002621,0.000021175843,0.00011010884,0.00027656107,0.000063035775],"domain_scores_gemma":[0.99775094,0.0013142987,0.00020191728,0.00017728252,0.00050468714,0.000050868297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010285783,0.00042495874,0.00073776214,0.0008874759,0.0002883504,0.00042387185,0.0007706107,0.000786028,0.0010583835],"category_scores_gemma":[0.002535461,0.00049175794,0.0005673719,0.00065876404,0.0003570142,0.00094627566,0.00044544955,0.00072566065,0.00031423537],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068053085,0.0002246838,0.005710865,0.00033361555,0.00014623969,0.00017074746,0.00015832257,0.2384899,0.35577542,0.0081744585,0.0017506472,0.38838458],"study_design_scores_gemma":[0.000009806666,0.000044465534,0.0019481657,0.000004655539,0.000023035702,0.000076795935,0.0000059936087,0.9574771,0.039412104,0.0006621094,0.00031009593,0.000025679712],"about_ca_topic_score_codex":0.0038574995,"about_ca_topic_score_gemma":0.0052995263,"teacher_disagreement_score":0.0038574995,"about_ca_system_score_codex":0.0005315499,"about_ca_system_score_gemma":0.0006603776,"threshold_uncertainty_score":0.0076701045},"labels":[],"label_agreement":null},{"id":"W2057053708","doi":"10.1016/j.autcon.2014.10.007","title":"Exploring cellular automata for high density residential building form generation","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Cellular Automata and Applications","field":"Computer Science","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Cellular automaton; Computer science; Context (archaeology); Diagrammatic reasoning; Adaptation (eye); Process (computing); Architectural design; Architectural engineering; Architectural model; Theoretical computer science; Architecture; Programming language; Engineering; Artificial intelligence; Geography","score_opus":0.04911065660645651,"score_gpt":0.24921699244995185,"score_spread":0.20010633584349535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057053708","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23061323,0.00038789064,0.74326867,0.00039046715,0.000059407856,0.00004861322,0.00011682108,0.00034108444,0.024773845],"genre_scores_gemma":[0.9539808,0.00014190472,0.043340143,0.000031475625,0.000009721956,0.00003717762,0.000042505613,0.000030515517,0.0023857853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998709,0.00005150163,0.000004016729,0.00002367249,0.000031285083,0.000018643337],"domain_scores_gemma":[0.9994184,0.0004369294,0.000027332007,0.000047266567,0.000051568146,0.00001861891],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021577385,0.00032316588,0.0004970493,0.00041498116,0.00054486026,0.00096104166,0.00073866925,0.00083694916,0.0024054183],"category_scores_gemma":[0.0015531095,0.00040615318,0.00059398205,0.00052266754,0.0007218816,0.0006648933,0.0009192843,0.00045870693,0.0002481598],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016189782,0.000018369885,0.0005250612,0.000025632831,0.000009244529,0.00006403757,0.00007580581,0.9488796,0.0014171525,0.041668776,0.00026380166,0.0070364093],"study_design_scores_gemma":[0.000002471291,0.0000031822256,0.000054469765,0.0000016211761,0.0000017869506,0.000008596534,0.000011984606,0.9916435,0.00015750997,0.00790834,0.00020446208,0.0000020709288],"about_ca_topic_score_codex":0.008185517,"about_ca_topic_score_gemma":0.008739252,"teacher_disagreement_score":0.008185517,"about_ca_system_score_codex":0.00075943646,"about_ca_system_score_gemma":0.00048418398,"threshold_uncertainty_score":0.016275704},"labels":[],"label_agreement":null},{"id":"W2064569735","doi":"10.1016/j.autcon.2012.11.027","title":"Onsite 3D marking for construction activity tracking","year":2012,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Software; MATLAB; Field (mathematics); Tracking (education); Track (disk drive); Computer science; Engineering; Tracking system; Pipeline (software); Object (grammar); Systems engineering; Real-time computing; Artificial intelligence; Kalman filter; Mechanical engineering","score_opus":0.030835361838088507,"score_gpt":0.24938364760052809,"score_spread":0.21854828576243956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2064569735","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053378876,0.00013682219,0.91681993,0.000085764055,0.00010180219,0.0001293325,0.0009592623,0.010515902,0.017872298],"genre_scores_gemma":[0.59290683,0.00022530644,0.38184142,0.000092877344,0.00003488405,0.00019296109,0.0021090175,0.00086181116,0.021734903],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992956,0.00008535395,0.000017121889,0.000098894074,0.00043754248,0.000065469794],"domain_scores_gemma":[0.99936825,0.0001486846,0.000042169027,0.00022248561,0.00018042022,0.000038111186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033098125,0.00069794594,0.0004648276,0.0011339892,0.0004559698,0.0012132585,0.0010379791,0.0007781149,0.014907035],"category_scores_gemma":[0.0010623271,0.00050685665,0.0004150172,0.0010690587,0.00029698372,0.0007576672,0.0019289026,0.0004447688,0.004347091],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004975147,0.00024261129,0.0064598047,0.00024882247,0.00003585619,0.00022857284,0.00047257467,0.021954289,0.13465406,0.0052017337,0.014114281,0.8158899],"study_design_scores_gemma":[0.00009285773,0.0004449849,0.031686116,0.00015281208,0.000084400584,0.001297501,0.0006449524,0.577362,0.24902493,0.008365151,0.1306762,0.00016803687],"about_ca_topic_score_codex":0.0035619405,"about_ca_topic_score_gemma":0.010270182,"teacher_disagreement_score":0.014907035,"about_ca_system_score_codex":0.00033989234,"about_ca_system_score_gemma":0.0006621318,"threshold_uncertainty_score":0.049869},"labels":[],"label_agreement":null},{"id":"W2073515309","doi":"10.1016/j.autcon.2012.10.005","title":"Accuracy assessment of Ultra-Wide Band technology in tracking static resources in indoor construction scenarios","year":2012,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Indoor and Outdoor Localization Technologies","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Tracking (education); Computer science; Ultra-wideband; Metre; Real-time computing; Mode (computer interface); Tracking system; Ranging; Key (lock); Simulation; Telecommunications; Artificial intelligence; Kalman filter; Computer security","score_opus":0.009143858103549913,"score_gpt":0.2565653241378385,"score_spread":0.24742146603428858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073515309","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8327714,0.00063489104,0.16188599,0.00007173079,0.000053346936,0.000025121686,0.00013853582,0.00037785864,0.0040411917],"genre_scores_gemma":[0.9909719,0.00014140927,0.008265015,0.000014387242,0.0000059849303,0.0000064953356,0.00010113084,0.00001206789,0.0004814871],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99894685,0.00030923044,0.000039598035,0.0001468187,0.00040285452,0.00015457727],"domain_scores_gemma":[0.99761605,0.0011769101,0.00022726375,0.00023885435,0.00068549544,0.000055438064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009855448,0.0004638554,0.00040517925,0.00095652894,0.00030959703,0.00077777205,0.0006853378,0.0010956033,0.00054182974],"category_scores_gemma":[0.004242214,0.00016897114,0.00029875463,0.00083332835,0.0003002128,0.00092277525,0.0006701592,0.00025480738,0.00031892193],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034935744,0.00031037297,0.17641535,0.0005016769,0.00037388798,0.0007646921,0.00064035767,0.38796443,0.11681993,0.0030458423,0.0012550873,0.30841476],"study_design_scores_gemma":[0.000042548003,0.0013323454,0.08797476,0.00006311998,0.00032528973,0.000903518,0.00055220735,0.82591045,0.07978625,0.0011969092,0.0018379905,0.00007457593],"about_ca_topic_score_codex":0.003114613,"about_ca_topic_score_gemma":0.0024831044,"teacher_disagreement_score":0.003114613,"about_ca_system_score_codex":0.00038190707,"about_ca_system_score_gemma":0.00028402224,"threshold_uncertainty_score":0.006192982},"labels":[],"label_agreement":null},{"id":"W2089835841","doi":"10.1016/j.autcon.2013.05.006","title":"Benchmarking model for the ongoing commissioning of the refrigeration systemof an indoor ice rink","year":2013,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Benchmarking; Refrigeration; Project commissioning; Environmental science; Engineering; Computer science; Systems engineering; Mechanical engineering; Business; Political science","score_opus":0.00995340192861309,"score_gpt":0.20692769606408523,"score_spread":0.19697429413547213,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089835841","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88511235,0.00064288446,0.07333195,0.0005562526,0.00016001546,0.00018996454,0.0036775135,0.0011517905,0.035177294],"genre_scores_gemma":[0.9943514,0.00006669827,0.0027199364,0.00002595313,0.0000060641178,0.000051201605,0.00067491987,0.000048177502,0.0020556783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950325,0.00015534527,0.000018234341,0.000091228765,0.00010851221,0.00012341132],"domain_scores_gemma":[0.99923646,0.00036256269,0.000053974403,0.000075896474,0.0002189836,0.00005216139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090280705,0.0011193228,0.0015505768,0.0007000787,0.0007480031,0.0013513995,0.0016632876,0.0019174844,0.004767193],"category_scores_gemma":[0.0016846572,0.0005273012,0.0010295925,0.00090478937,0.00060383166,0.0008668627,0.00047968276,0.001000199,0.00047438557],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000529185,0.000022960225,0.0004285984,0.000018453125,0.0000067791384,0.000028106573,0.0000063016946,0.99779797,0.0002930488,0.0002624801,0.0002065662,0.0008759126],"study_design_scores_gemma":[0.000012252047,0.00003342575,0.0005537197,0.0000032806772,0.000006834846,0.0000050588255,0.000009633568,0.9986885,0.0004073531,0.00012496779,0.0001490548,0.000005853841],"about_ca_topic_score_codex":0.07870492,"about_ca_topic_score_gemma":0.035731323,"teacher_disagreement_score":0.07870492,"about_ca_system_score_codex":0.0023438425,"about_ca_system_score_gemma":0.0017123414,"threshold_uncertainty_score":0.1564936},"labels":[],"label_agreement":null},{"id":"W2093303892","doi":"10.1016/j.autcon.2013.06.011","title":"Image-based retrieval of concrete crack properties for bridge inspection","year":2013,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":401,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Visualization; Tortuosity; Bridge (graph theory); Representation (politics); Computer science; Cracking; Artificial neural network; Structural engineering; Structural health monitoring; Artificial intelligence; Computer vision; Engineering; Materials science; Geotechnical engineering","score_opus":0.010021539998722073,"score_gpt":0.21309947893728928,"score_spread":0.2030779389385672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093303892","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32775557,0.0053494973,0.6513528,0.00035762545,0.00022563868,0.00025572797,0.0020544196,0.006116996,0.006531822],"genre_scores_gemma":[0.65608865,0.0022318724,0.3299718,0.00021472858,0.00021450773,0.00013889327,0.0036831673,0.00028928416,0.0071670804],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975187,0.000029495388,0.000011739058,0.00005292735,0.00011222387,0.000041737814],"domain_scores_gemma":[0.999627,0.00009093653,0.000036821868,0.00007592136,0.00014309984,0.000026244928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030991685,0.0005611238,0.00091673154,0.002307324,0.00018402954,0.0006284285,0.0007301595,0.0011185458,0.0031575838],"category_scores_gemma":[0.0011191858,0.0002647788,0.00050572597,0.0012647465,0.00021990284,0.00085179566,0.00048952317,0.00039557213,0.0022709665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009781409,0.00028536763,0.0020508373,0.0002920168,0.00007761029,0.00021536017,0.000044780052,0.00569917,0.45886186,0.00040346655,0.006757873,0.5243334],"study_design_scores_gemma":[0.00012722767,0.00046633423,0.02382681,0.00005428458,0.00026221262,0.0014175769,0.00012265415,0.6490723,0.314765,0.0012498106,0.008562538,0.000073241325],"about_ca_topic_score_codex":0.00253635,"about_ca_topic_score_gemma":0.0040730825,"teacher_disagreement_score":0.0031575838,"about_ca_system_score_codex":0.00023119785,"about_ca_system_score_gemma":0.00040189916,"threshold_uncertainty_score":0.010563195},"labels":[],"label_agreement":null},{"id":"W2097221445","doi":"10.1016/j.autcon.2005.02.007","title":"Segmentation of buried concrete pipe images","year":2005,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":125,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Piping; Pipeline transport; Pipeline (software); Segmentation; Engineering; Canalisation; Nominal Pipe Size; Trenchless technology; Image segmentation; Image processing; Computer science; Civil engineering; Structural engineering; Image (mathematics); Artificial intelligence; Mechanical engineering","score_opus":0.003780278290669983,"score_gpt":0.21331117611248615,"score_spread":0.20953089782181616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097221445","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4866842,0.0009370632,0.49772114,0.00031437085,0.000086780165,0.00016734366,0.0011749538,0.0040594344,0.008854671],"genre_scores_gemma":[0.68822503,0.00077641284,0.29949793,0.00006462969,0.00006444049,0.00004949115,0.0025311522,0.0006506333,0.008140374],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998192,0.00001686403,0.0000082864,0.00003882811,0.000066798675,0.000050031704],"domain_scores_gemma":[0.9996307,0.00009428438,0.00004119553,0.000054719,0.000136241,0.000042893644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023755328,0.00047706423,0.00036390132,0.0018641842,0.00028043333,0.000840241,0.00033306848,0.00066716154,0.002716813],"category_scores_gemma":[0.00069171353,0.00039448251,0.000310588,0.0010423925,0.00028714084,0.0004817239,0.00036420047,0.0004619776,0.0009556076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067810586,0.00010353087,0.0031686607,0.00024946692,0.000044844663,0.00053878303,0.00031316045,0.020462377,0.5812615,0.002006381,0.004737977,0.3864353],"study_design_scores_gemma":[0.000053352273,0.00023168564,0.06436821,0.00009875387,0.00009719939,0.0017314482,0.00039444744,0.531492,0.3781839,0.003603072,0.019679246,0.00006672819],"about_ca_topic_score_codex":0.0039910953,"about_ca_topic_score_gemma":0.005351887,"teacher_disagreement_score":0.0039910953,"about_ca_system_score_codex":0.00032229882,"about_ca_system_score_gemma":0.0006328877,"threshold_uncertainty_score":0.009088635},"labels":[],"label_agreement":null},{"id":"W2106238010","doi":"10.1016/j.autcon.2005.02.006","title":"Automated detection of cracks in buried concrete pipe images","year":2005,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":282,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Engineering; Structural engineering; Geology; Geotechnical engineering; Forensic engineering; Computer science; Engineering drawing","score_opus":0.0033791300860116094,"score_gpt":0.21251453814315266,"score_spread":0.20913540805714104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106238010","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67761606,0.0004860734,0.31481597,0.00018623397,0.00006734246,0.00008132244,0.0003892132,0.0036628584,0.0026948738],"genre_scores_gemma":[0.8343467,0.0002504108,0.16219698,0.00004373675,0.00004550948,0.000023056817,0.00065690244,0.00011710223,0.0023194635],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971074,0.000035005934,0.0000097183765,0.000056414578,0.00014259548,0.000045402117],"domain_scores_gemma":[0.9990402,0.00028697963,0.000111756315,0.00011189667,0.00037448408,0.00007473578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003111004,0.00034203005,0.00047102035,0.0014393033,0.00019882279,0.000544116,0.00045186208,0.0006559598,0.001053077],"category_scores_gemma":[0.0011560847,0.00026641614,0.00021262343,0.00043808777,0.00022300455,0.00047573252,0.0004428234,0.00038829775,0.0004956212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005564006,0.00015901378,0.009294168,0.00015044816,0.000051036208,0.0002856726,0.00015499197,0.011662143,0.51167315,0.000659705,0.0034375421,0.46191576],"study_design_scores_gemma":[0.00005332727,0.00024591526,0.07226478,0.00003398239,0.00007508139,0.0009644343,0.00012436195,0.6952032,0.22542252,0.0011477905,0.0044302545,0.00003438906],"about_ca_topic_score_codex":0.0020309957,"about_ca_topic_score_gemma":0.0038805485,"teacher_disagreement_score":0.0020309957,"about_ca_system_score_codex":0.00019013247,"about_ca_system_score_gemma":0.00037573828,"threshold_uncertainty_score":0.0040382743},"labels":[],"label_agreement":null},{"id":"W2109524929","doi":"10.1016/j.autcon.2006.07.009","title":"Cell-based representation and analysis of spatial resources in construction simulation","year":2006,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Concordia University","funders":"","keywords":"Representation (politics); Visualization; Discrete event simulation; Computer science; Resource (disambiguation); Space (punctuation); Industrial engineering; Simulation modeling; Data mining; Systems engineering; Operations research; Simulation; Engineering; Mathematics","score_opus":0.005391978941744774,"score_gpt":0.21942441947591912,"score_spread":0.21403244053417433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109524929","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11672027,0.00023009564,0.8713132,0.00018075733,0.000040792856,0.000039868984,0.00034918342,0.0004033524,0.010722379],"genre_scores_gemma":[0.9203335,0.00030616342,0.076294586,0.000029932464,0.0000122857355,0.00008308518,0.00028260454,0.000095974996,0.0025617594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998386,0.00004451505,0.000008891598,0.000018706527,0.00006190779,0.000027417656],"domain_scores_gemma":[0.9997029,0.00013763976,0.000022137436,0.00003921745,0.000075250944,0.000022894805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031042815,0.00026753763,0.00071377936,0.0007100384,0.0005033828,0.0017185246,0.0009972516,0.00074311625,0.0022710327],"category_scores_gemma":[0.0011048081,0.00032894127,0.0004842703,0.0012989857,0.0007107825,0.0008450831,0.00072215375,0.00048167887,0.000420372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014657621,0.000015663172,0.0004600143,0.0000127761705,0.000008604347,0.00002286622,0.00005844509,0.9648851,0.0011068961,0.027857492,0.00018625481,0.0053711827],"study_design_scores_gemma":[0.0000013913118,0.000002389489,0.00006418014,0.0000015490122,0.0000020931886,0.0000044673557,0.000013514455,0.9957826,0.00032444252,0.0033262065,0.00047460455,0.0000025636307],"about_ca_topic_score_codex":0.02719322,"about_ca_topic_score_gemma":0.016695855,"teacher_disagreement_score":0.02719322,"about_ca_system_score_codex":0.0010566969,"about_ca_system_score_gemma":0.0010402843,"threshold_uncertainty_score":0.054069877},"labels":[],"label_agreement":null},{"id":"W2131009518","doi":"10.1016/j.autcon.2015.10.014","title":"Skeleton-based discrepancy feedback for automated realignment of industrial assemblies","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":44,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Iterative closest point; Cube (algebra); Point cloud; Point (geometry); Transformation (genetics); Algorithm; Engineering drawing; Artificial intelligence; Engineering; Geometry; Mathematics","score_opus":0.0626932143934074,"score_gpt":0.2720962851236428,"score_spread":0.2094030707302354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131009518","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067565344,0.00017895117,0.9244392,0.00007712318,0.00007115159,0.0000653695,0.00013596799,0.006060671,0.0014061598],"genre_scores_gemma":[0.55245286,0.00011216926,0.4435058,0.000050670973,0.000032546537,0.00007992887,0.0007069574,0.00063009554,0.0024288609],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892765,0.00014128817,0.000057252193,0.00020947235,0.0005807301,0.00008348595],"domain_scores_gemma":[0.9979248,0.00061246415,0.00026867192,0.00029232926,0.00080014346,0.000101651276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010544545,0.0011773697,0.0010072879,0.0016754622,0.00037082224,0.0006129219,0.0013194681,0.0010253643,0.0054150247],"category_scores_gemma":[0.0044569043,0.0006005109,0.00039368065,0.00081838184,0.00035528344,0.0008923928,0.0016465841,0.000839176,0.0014239914],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012633874,0.00021826013,0.0019538107,0.00020401222,0.000035749385,0.00020946897,0.00023961859,0.057505835,0.10302462,0.0016977582,0.005321698,0.8283258],"study_design_scores_gemma":[0.000039879407,0.0001477795,0.0016624377,0.000019158011,0.000012660524,0.00014904654,0.000048365393,0.96819824,0.026554352,0.0010165893,0.002133777,0.000017638637],"about_ca_topic_score_codex":0.0019750935,"about_ca_topic_score_gemma":0.0030977672,"teacher_disagreement_score":0.0054150247,"about_ca_system_score_codex":0.0003339053,"about_ca_system_score_gemma":0.0007616658,"threshold_uncertainty_score":0.018115044},"labels":[],"label_agreement":null},{"id":"W2144433307","doi":"10.1016/s0926-5805(99)00002-3","title":"A development framework for data models for computer-integrated facilities management","year":2000,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Interoperability; Engineering management; Facility management; Data management; Architecture; Construction management; Computer science; Systems engineering; Engineering; Data sharing; Software engineering; Database; Business; World Wide Web","score_opus":0.030962210141640918,"score_gpt":0.24504336583325712,"score_spread":0.2140811556916162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144433307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00053751253,0.000079639794,0.99360645,0.00013888752,0.00003661686,0.00014820427,0.000429003,0.003953388,0.0010702618],"genre_scores_gemma":[0.020471903,0.0003374253,0.97267514,0.00012311885,0.000029320647,0.000497068,0.0030645072,0.0011549407,0.0016466052],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957151,0.0008261047,0.000825148,0.00045750124,0.0019147833,0.000261373],"domain_scores_gemma":[0.99519145,0.0013539563,0.0002734132,0.0014600663,0.0014483159,0.0002728277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075730043,0.0014845902,0.0015504498,0.0029472795,0.0015879172,0.0074859075,0.005668072,0.002280414,0.0053178696],"category_scores_gemma":[0.011492635,0.0021129167,0.0034657759,0.003189865,0.0014488223,0.0062269312,0.004298194,0.0043846047,0.0031780377],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014448474,0.00026404468,0.0017318677,0.00087230565,0.00030581089,0.00064537884,0.0012557561,0.11418962,0.005629489,0.61524844,0.034102924,0.22560994],"study_design_scores_gemma":[0.000076122684,0.000083905215,0.00034958276,0.00046537325,0.00021670737,0.00045850995,0.00022856751,0.51682806,0.011612178,0.17667793,0.29287878,0.00012430936],"about_ca_topic_score_codex":0.012665068,"about_ca_topic_score_gemma":0.015941465,"teacher_disagreement_score":0.012665068,"about_ca_system_score_codex":0.0021144946,"about_ca_system_score_gemma":0.004586704,"threshold_uncertainty_score":0.040050387},"labels":[],"label_agreement":null},{"id":"W2178405569","doi":"10.1016/j.autcon.2015.09.006","title":"A hybrid simulation approach for quantitatively analyzing the impact of facility size on construction projects","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Sizing; Process (computing); Flexibility (engineering); Industrial engineering; Discrete event simulation; Simulation modeling; Computer science; Operations research; Project management; Interdependence; Task (project management); Facility management; Engineering; Systems engineering; Simulation","score_opus":0.04389776266904169,"score_gpt":0.29872320346662223,"score_spread":0.2548254407975805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178405569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40971464,0.00020159782,0.5719055,0.0001775761,0.000053348333,0.00012430479,0.0006276819,0.0012335151,0.01596183],"genre_scores_gemma":[0.96274066,0.00006676574,0.03551642,0.000027793903,0.00000824393,0.00011324096,0.00017085932,0.00005226373,0.0013037771],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995789,0.00017982656,0.000017298014,0.000049597304,0.000116990486,0.000057436842],"domain_scores_gemma":[0.9986123,0.0009403647,0.000095195945,0.00012763262,0.00016718885,0.00005729277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078755565,0.0006026329,0.00090995326,0.001349237,0.00047026935,0.0008999535,0.001147107,0.0011695203,0.0026469876],"category_scores_gemma":[0.0018497716,0.0005515492,0.0008388602,0.0013508699,0.00051219616,0.0007471214,0.00069469167,0.0004833109,0.00021056902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003250249,0.000031685504,0.00074825983,0.000008487713,0.000017791866,0.000012900664,0.000012499043,0.99510103,0.0007440359,0.0012146162,0.000049118265,0.002027073],"study_design_scores_gemma":[0.0000037256639,0.000012282052,0.00016723508,9.654927e-7,0.000003718111,0.0000042083607,0.0000043347122,0.9992066,0.0001986799,0.00032281858,0.00007231579,0.0000030304109],"about_ca_topic_score_codex":0.017301247,"about_ca_topic_score_gemma":0.011498964,"teacher_disagreement_score":0.017301247,"about_ca_system_score_codex":0.0012194419,"about_ca_system_score_gemma":0.0011951437,"threshold_uncertainty_score":0.03440112},"labels":[],"label_agreement":null},{"id":"W2478677992","doi":"10.1016/j.autcon.2016.06.008","title":"Vision-based detection of loosened bolts using the Hough transform and support vector machines","year":2016,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Image and Object Detection Techniques","field":"Computer Science","cited_by":321,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Hough transform; Artificial intelligence; Support vector machine; Computer vision; Computer science; Classifier (UML); Machine vision; Pattern recognition (psychology); Image (mathematics)","score_opus":0.007022474976540436,"score_gpt":0.2489476999670424,"score_spread":0.24192522499050198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2478677992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17613979,0.0004309164,0.8193826,0.00008417537,0.000062148705,0.00005632172,0.000068319256,0.0024607168,0.0013151023],"genre_scores_gemma":[0.82352024,0.00020433136,0.174417,0.000030475097,0.00002739725,0.000029538716,0.0001685609,0.000108925895,0.0014934829],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991722,0.00006755992,0.000026231513,0.00012645422,0.00049552566,0.00011213794],"domain_scores_gemma":[0.9986914,0.0002840563,0.00023209662,0.00021537626,0.00047185473,0.00010523343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005098427,0.0007977567,0.0010354024,0.0027107862,0.0003716167,0.0009936851,0.0013158101,0.0008948539,0.0016080651],"category_scores_gemma":[0.0017916203,0.00059560145,0.0005073649,0.0015571298,0.0006555098,0.0012132844,0.0011668813,0.0008783475,0.0006591785],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008726538,0.00022379054,0.011839746,0.00021920653,0.00010681913,0.00041256798,0.00025270466,0.048826307,0.3034501,0.0022624158,0.0018985079,0.6296353],"study_design_scores_gemma":[0.00003621835,0.00030907014,0.022955067,0.000032352455,0.00007521734,0.00069285365,0.00014980682,0.82504284,0.14560235,0.0025729628,0.0024695648,0.00006162506],"about_ca_topic_score_codex":0.0015655883,"about_ca_topic_score_gemma":0.0020363117,"teacher_disagreement_score":0.0027107862,"about_ca_system_score_codex":0.0005542036,"about_ca_system_score_gemma":0.00053720595,"threshold_uncertainty_score":0.0053795576},"labels":[],"label_agreement":null},{"id":"W2514821803","doi":"10.1016/j.autcon.2016.08.022","title":"A mixed-integer linear programming approach for temporary haul road design in rough-grading projects","year":2016,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Truck; Integer programming; Engineering; Linear programming; Grading (engineering); Transport engineering; Industrial engineering; Field (mathematics); Operations research; Computer science; Civil engineering; Algorithm","score_opus":0.027365751112331665,"score_gpt":0.23938475201267698,"score_spread":0.2120190009003453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2514821803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0079135,0.00016245882,0.9880436,0.00009685338,0.000035554676,0.00006702123,0.000057162735,0.000114867806,0.00350902],"genre_scores_gemma":[0.33365917,0.00035608537,0.6574016,0.0001568771,0.00008133447,0.0005428406,0.00022550096,0.000193042,0.007383431],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992142,0.0003733496,0.000027927586,0.00010845114,0.00016747863,0.000108705855],"domain_scores_gemma":[0.99900025,0.0007029647,0.00007469304,0.000026901522,0.00014226968,0.000052939027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018364165,0.0013406747,0.0018516461,0.0011102781,0.0006766362,0.0019849204,0.0021990214,0.0018307563,0.006139759],"category_scores_gemma":[0.0024937154,0.0015434267,0.0017478873,0.0011519459,0.00070109084,0.001402706,0.001264228,0.001511153,0.0006398064],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025743228,0.000041614425,0.00010860249,0.000058212554,0.000018230849,0.000030757677,0.000022513186,0.9829064,0.0004366962,0.0037672396,0.00040075177,0.0121832425],"study_design_scores_gemma":[0.0000035969408,0.00001551149,0.000015891408,0.0000038026465,0.0000036810216,0.0000025002566,0.0000064593655,0.9987804,0.000067150155,0.0009248146,0.00017383587,0.0000022138734],"about_ca_topic_score_codex":0.009669532,"about_ca_topic_score_gemma":0.011292476,"teacher_disagreement_score":0.009669532,"about_ca_system_score_codex":0.0009765071,"about_ca_system_score_gemma":0.0015643284,"threshold_uncertainty_score":0.020539522},"labels":[],"label_agreement":null},{"id":"W2564340262","doi":"10.1016/j.autcon.2016.11.014","title":"Non-parametric weather generator for modelling construction operations: Comparison with the parametric approach and evaluation of construction-based impacts","year":2016,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Parametric statistics; Flexibility (engineering); Generator (circuit theory); Parametric model; Construct (python library); Computer science; Scale (ratio); Weather station; Reliability engineering; Industrial engineering; Simulation; Engineering; Meteorology; Power (physics); Mathematics; Statistics","score_opus":0.020135872224732284,"score_gpt":0.2535935015442223,"score_spread":0.23345762931949,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2564340262","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5672444,0.0003289877,0.42263824,0.00009837051,0.00006000248,0.00012993456,0.00033878084,0.00091390527,0.008247368],"genre_scores_gemma":[0.992782,0.00009336075,0.006620455,0.000004767489,0.000007399363,0.000034940473,0.000055747823,0.000032443448,0.00036874463],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957293,0.00018995258,0.000026368041,0.000057102192,0.00011292205,0.000040760635],"domain_scores_gemma":[0.9982488,0.0011820819,0.000120722674,0.00022386944,0.00017242564,0.00005211267],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007103426,0.0007116063,0.00083637837,0.00058778917,0.00026227432,0.0008007006,0.0012972394,0.0009277915,0.0012426446],"category_scores_gemma":[0.002998587,0.00030195693,0.0005725114,0.00069588376,0.00048524165,0.0011362404,0.0006508975,0.0006182592,0.00022742123],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063550826,0.00005769243,0.0017144639,0.0000386713,0.000014149441,0.000032906122,0.0000310008,0.9878719,0.0008919844,0.0008716557,0.000051340416,0.00836064],"study_design_scores_gemma":[0.0000035940232,0.00002475443,0.0005803683,0.0000016776727,0.000005694491,0.000007867621,0.000010285747,0.99869376,0.0003695212,0.00022314457,0.00007585656,0.0000035654282],"about_ca_topic_score_codex":0.0069362596,"about_ca_topic_score_gemma":0.0038147948,"teacher_disagreement_score":0.0069362596,"about_ca_system_score_codex":0.00034291565,"about_ca_system_score_gemma":0.0006310128,"threshold_uncertainty_score":0.01379174},"labels":[],"label_agreement":null},{"id":"W2639936844","doi":"10.1016/j.autcon.2017.05.005","title":"Integrated detection and tracking of workforce and equipment from construction jobsite videos","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":111,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workforce; Process (computing); Recall; Precision and recall; Tracking (education); Productivity; Computer science; Construction industry; Construction engineering; Engineering; Artificial intelligence; Operating system","score_opus":0.010166541907456203,"score_gpt":0.22714053410278734,"score_spread":0.21697399219533114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2639936844","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8604786,0.0014949908,0.08496168,0.0005040121,0.00030178527,0.00048627367,0.01804168,0.00231533,0.031415623],"genre_scores_gemma":[0.85826296,0.0008854672,0.11304292,0.00027544936,0.00021924409,0.00027411734,0.010990494,0.00022329576,0.015826043],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981123,0.000018075694,0.000004668385,0.00003703576,0.00008562821,0.0000435054],"domain_scores_gemma":[0.9994192,0.00014016684,0.000053521835,0.00004280726,0.0002686394,0.000075689735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027708703,0.00023896806,0.00021633727,0.00218944,0.00019478601,0.0003831564,0.0003238972,0.00065159355,0.0019442239],"category_scores_gemma":[0.001118476,0.000121874844,0.00015574576,0.0007827657,0.00008587747,0.0002920364,0.00048565486,0.0003260703,0.0010312442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006534662,0.00034540662,0.10243913,0.0008259011,0.00009827579,0.000926188,0.00089071895,0.00558963,0.24333943,0.0012435794,0.03260958,0.6110388],"study_design_scores_gemma":[0.000041948948,0.0003788899,0.73183167,0.00045698183,0.00012938103,0.0015100145,0.0013601516,0.13451752,0.08312625,0.0014082489,0.04515184,0.00008709249],"about_ca_topic_score_codex":0.0075633232,"about_ca_topic_score_gemma":0.021006856,"teacher_disagreement_score":0.0075633232,"about_ca_system_score_codex":0.00020415253,"about_ca_system_score_gemma":0.00036616903,"threshold_uncertainty_score":0.0150386095},"labels":[],"label_agreement":null},{"id":"W2674352656","doi":"10.1016/j.autcon.2017.06.008","title":"Machine vision-based model for spalling detection and quantification in subway networks","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":131,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Spall; Artificial intelligence; Computer science; Machine vision; Algorithm; Image processing; Machine learning; Engineering; Computer vision; Image (mathematics); Structural engineering","score_opus":0.010649106922485297,"score_gpt":0.2508803314358804,"score_spread":0.2402312245133951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2674352656","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0997777,0.0005376318,0.8950505,0.00024862462,0.00007783158,0.000047995847,0.00027197204,0.001044818,0.0029428736],"genre_scores_gemma":[0.9687778,0.00026223334,0.026337447,0.0000692547,0.000032856988,0.000088426175,0.00027539826,0.00003383719,0.0041226326],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975747,0.000031269185,0.000011817055,0.00009287514,0.00005258016,0.00005398442],"domain_scores_gemma":[0.99970514,0.000093936425,0.00004407812,0.00002335722,0.00011617414,0.000017267974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004036054,0.0005654004,0.00092639145,0.0006978635,0.00033476047,0.0008448899,0.0013332334,0.0011712478,0.0014083345],"category_scores_gemma":[0.000836327,0.00034141657,0.00066928857,0.00059209194,0.00045082992,0.00086425734,0.00039244152,0.00075945124,0.00044920197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006162434,0.00005634817,0.0010240853,0.00003386691,0.000024834668,0.00003983117,0.000020902879,0.9575757,0.0030898168,0.0018964887,0.000619835,0.035556786],"study_design_scores_gemma":[6.511076e-7,0.0000041928697,0.0001423758,9.144703e-7,0.0000020417488,0.0000028603852,9.742017e-7,0.9993687,0.00017425955,0.00025462738,0.000046743873,0.0000015557504],"about_ca_topic_score_codex":0.026441896,"about_ca_topic_score_gemma":0.016730374,"teacher_disagreement_score":0.026441896,"about_ca_system_score_codex":0.0012301023,"about_ca_system_score_gemma":0.0010631557,"threshold_uncertainty_score":0.052576005},"labels":[],"label_agreement":null},{"id":"W2737163017","doi":"10.1016/j.autcon.2017.06.024","title":"Remote sensing of concrete bridge decks using unmanned aerial vehicle infrared thermography","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":256,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Thermography; Bridge (graph theory); Delamination (geology); Computer science; Nondestructive testing; Remote sensing; Visual inspection; Process (computing); Hammer; Engineering; Marine engineering; Structural engineering; Artificial intelligence; Infrared; Geology","score_opus":0.013422998573721243,"score_gpt":0.24626720941730487,"score_spread":0.23284421084358364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2737163017","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9903377,0.00011923625,0.00747638,0.000020728314,0.000012949855,0.000007721023,0.00010581391,0.00009578407,0.00182369],"genre_scores_gemma":[0.99564594,0.000047207755,0.0036944742,0.000008386653,0.000004789269,0.0000032179737,0.000068374415,0.0000053593244,0.0005222089],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998965,0.0000098361115,0.0000024389078,0.000022104885,0.000053022923,0.000016144237],"domain_scores_gemma":[0.9999292,0.000011222573,0.000015597072,0.00000848536,0.000028104221,0.0000073330953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007093108,0.00016559007,0.00014352197,0.0004511298,0.00014726738,0.00022467414,0.0001839527,0.00021803471,0.0003943846],"category_scores_gemma":[0.000118147,0.000098641496,0.00010009187,0.0002882484,0.00014035827,0.00031856273,0.00020414473,0.00015906563,0.00016172489],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002549571,0.00021219696,0.07007223,0.00010185275,0.000053305448,0.00020098875,0.0003454743,0.024521386,0.7676901,0.00044678565,0.001028664,0.13507207],"study_design_scores_gemma":[0.000043026965,0.00031531492,0.574217,0.000036318514,0.00006885249,0.0003424765,0.00070778705,0.2753654,0.14422882,0.0006443417,0.0039832694,0.000047368987],"about_ca_topic_score_codex":0.0034909204,"about_ca_topic_score_gemma":0.009581958,"teacher_disagreement_score":0.0034909204,"about_ca_system_score_codex":0.00015385964,"about_ca_system_score_gemma":0.00016132815,"threshold_uncertainty_score":0.0069411993},"labels":[],"label_agreement":null},{"id":"W2743381849","doi":"10.1016/j.autcon.2017.07.003","title":"Credible interval estimation for fraction nonconforming: Analytical and numerical solutions","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Control Systems and Identification","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Fraction (chemistry); Interval (graph theory); Interval estimation; Estimation; Confidence interval; Mathematics; Statistics; Computer science; Algorithm; Applied mathematics; Engineering; Chromatography; Combinatorics; Systems engineering; Chemistry","score_opus":0.023189554966009954,"score_gpt":0.28056339735001334,"score_spread":0.2573738423840034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2743381849","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011953933,0.0012099359,0.9831262,0.00050461135,0.000052578045,0.000058553385,0.00010606755,0.00010485102,0.0028832287],"genre_scores_gemma":[0.68110585,0.0043254616,0.3038471,0.00038678636,0.00053592504,0.000567689,0.0008404291,0.0004275574,0.0079632215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9938088,0.0038608264,0.00020778555,0.00092669553,0.000773465,0.00042238738],"domain_scores_gemma":[0.7583507,0.22638553,0.0046772556,0.0039542294,0.005325546,0.0013068528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026727201,0.001964137,0.004097597,0.0050622676,0.0012073934,0.004347752,0.0046613226,0.0039033028,0.006533419],"category_scores_gemma":[0.18166454,0.0016252439,0.0031204442,0.0033191817,0.0062880516,0.0069469856,0.0036500269,0.0059728795,0.0005040265],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012560152,0.00005209135,0.0014408026,0.00031995293,0.00015793178,0.00021860322,0.00037029968,0.7013042,0.00038748144,0.27735424,0.0020006807,0.016268112],"study_design_scores_gemma":[0.000013943775,0.0000193382,0.00026347637,0.00007745755,0.000028144965,0.000051307754,0.00007013701,0.9173522,0.00017703498,0.08145796,0.00045496962,0.000033978366],"about_ca_topic_score_codex":0.009120689,"about_ca_topic_score_gemma":0.0044817994,"teacher_disagreement_score":0.026727201,"about_ca_system_score_codex":0.0031877537,"about_ca_system_score_gemma":0.0023886827,"threshold_uncertainty_score":0.14134866},"labels":[],"label_agreement":null},{"id":"W2751155896","doi":"10.1016/j.autcon.2017.08.026","title":"Project collective mind: Unlocking project discussion networks","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Complex Network Analysis Techniques","field":"Physics and Astronomy","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; Concordia University","funders":"","keywords":"Computer science; Social network analysis; Relevance (law); Centrality; PageRank; Data science; Semantics (computer science); Social network (sociolinguistics); Context (archaeology); Social media; Set (abstract data type); Link analysis; Information exchange; World Wide Web; Information retrieval","score_opus":0.02129116276027732,"score_gpt":0.31751783080101614,"score_spread":0.2962266680407388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751155896","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17481823,0.0005209092,0.8064132,0.002306148,0.00016910196,0.00020394169,0.0010859108,0.0022870975,0.012195521],"genre_scores_gemma":[0.8598166,0.0002627811,0.13574304,0.00016085866,0.00010981562,0.00031330733,0.0007586587,0.00026024002,0.002574744],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99410135,0.0036862446,0.00019293457,0.0010694625,0.0006913245,0.0002586968],"domain_scores_gemma":[0.9163223,0.0645122,0.0056805303,0.009146694,0.0023717037,0.001966598],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008592075,0.00074928504,0.00067129644,0.0045214663,0.0018553046,0.0047910092,0.0016900435,0.001353615,0.004298914],"category_scores_gemma":[0.068644546,0.00081569044,0.0006580072,0.004202505,0.0027186715,0.01463773,0.0065195337,0.002007989,0.00074108277],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012148048,0.00041800915,0.036867112,0.00071499264,0.0002050726,0.00023717893,0.019109504,0.07049025,0.008156487,0.3796299,0.01194044,0.47101623],"study_design_scores_gemma":[0.0000561915,0.00007360567,0.0058557945,0.00010839401,0.000078701065,0.00009385122,0.003227205,0.4584053,0.0031135087,0.5119312,0.0170073,0.000049004557],"about_ca_topic_score_codex":0.0027095529,"about_ca_topic_score_gemma":0.0027656686,"teacher_disagreement_score":0.008592075,"about_ca_system_score_codex":0.001261619,"about_ca_system_score_gemma":0.0014843754,"threshold_uncertainty_score":0.04543972},"labels":[],"label_agreement":null},{"id":"W2752201218","doi":"10.1016/j.autcon.2017.08.006","title":"Developing owner information requirements for BIM-enabled project delivery and asset management","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":199,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Process management; Documentation; Requirements analysis; Asset (computer security); Interoperability; Process (computing); Asset management; Requirements management; Facility management; Integrated project delivery; Usability; Knowledge management; Requirements elicitation; Information model; Systems engineering; Engineering management; Computer science; Project management; Engineering; Business; Software engineering; Operations management; Software","score_opus":0.0240650905787071,"score_gpt":0.2669994118936201,"score_spread":0.242934321314913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2752201218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07676319,0.000108062566,0.8891988,0.00060744514,0.000040293864,0.00074983184,0.00089898764,0.0015047272,0.030128654],"genre_scores_gemma":[0.54278123,0.00019449274,0.4481018,0.000108988635,0.00001833733,0.0007199873,0.0029477787,0.00061057,0.004516861],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9875493,0.0038365219,0.0009107708,0.00045809208,0.0064513083,0.00079402747],"domain_scores_gemma":[0.9796052,0.010576047,0.0013627975,0.002024925,0.0061367163,0.00029438798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0077386787,0.0008369476,0.0006687195,0.002565373,0.0007100327,0.0027571386,0.0017174524,0.0014802472,0.0045863665],"category_scores_gemma":[0.034599952,0.0011257216,0.00094772375,0.0013371649,0.0006815159,0.004269347,0.0023022199,0.0012564773,0.001661794],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038061917,0.00089416216,0.015672904,0.0011755176,0.000098789795,0.0019963332,0.003581644,0.35772547,0.05660558,0.24435802,0.018209701,0.29930118],"study_design_scores_gemma":[0.000030134173,0.00013926117,0.0036815754,0.00027890602,0.000054397755,0.0004863354,0.0012693292,0.9039871,0.04195458,0.019200826,0.028856905,0.000060585673],"about_ca_topic_score_codex":0.0056965435,"about_ca_topic_score_gemma":0.007865431,"teacher_disagreement_score":0.0077386787,"about_ca_system_score_codex":0.0014994321,"about_ca_system_score_gemma":0.0032496636,"threshold_uncertainty_score":0.040926516},"labels":[],"label_agreement":null},{"id":"W2782344141","doi":"10.1016/j.autcon.2017.12.029","title":"6D DBSCAN-based segmentation of building point clouds for planar object classification","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":124,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Science Foundation","keywords":"Point cloud; DBSCAN; Computer science; Artificial intelligence; Segmentation; Cluster analysis; Pattern recognition (psychology); Planar; Classifier (UML); Computer vision; Fuzzy clustering; Computer graphics (images)","score_opus":0.028550884966773913,"score_gpt":0.268375190114011,"score_spread":0.2398243051472371,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782344141","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04555103,0.0004728507,0.93539006,0.0001413356,0.0000937501,0.00016849692,0.0020512606,0.010912135,0.0052189426],"genre_scores_gemma":[0.21394299,0.00055227405,0.7744921,0.0000816907,0.000040057756,0.00015398777,0.006640675,0.00057712966,0.003519109],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990766,0.000050548133,0.000053888623,0.00016428936,0.00051541295,0.00013921586],"domain_scores_gemma":[0.9995528,0.000046252462,0.000033105556,0.000095638934,0.00024250486,0.000029732371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003213149,0.00094753323,0.0011607883,0.0040304023,0.0006648996,0.0016976771,0.0018721758,0.0009030965,0.0064895204],"category_scores_gemma":[0.0009150426,0.00078670535,0.001191705,0.0048197643,0.0004929714,0.0009196448,0.0014996629,0.00094975537,0.003370807],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030255783,0.00018421355,0.0028254497,0.00026862283,0.00014720958,0.00010371147,0.000220791,0.04656705,0.060410667,0.004404628,0.008721947,0.8758431],"study_design_scores_gemma":[0.000025445546,0.0000665654,0.006135811,0.00004001856,0.000073493524,0.0002937925,0.0001812964,0.90749204,0.06946727,0.003793656,0.012367145,0.0000634258],"about_ca_topic_score_codex":0.021908415,"about_ca_topic_score_gemma":0.03469095,"teacher_disagreement_score":0.021908415,"about_ca_system_score_codex":0.0007901125,"about_ca_system_score_gemma":0.002140574,"threshold_uncertainty_score":0.043561757},"labels":[],"label_agreement":null},{"id":"W2886047522","doi":"10.1016/j.autcon.2018.06.015","title":"Feasibility study for drone-based masonry construction of real-scale structures","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":122,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Institut national de la recherche scientifique","keywords":"Drone; Masonry; Architectural engineering; Field (mathematics); Scale (ratio); Profitability index; Construction engineering; Computer science; Engineering; Quality (philosophy); Risk analysis (engineering); Systems engineering; Civil engineering; Business","score_opus":0.018894540981988985,"score_gpt":0.2822308544300502,"score_spread":0.2633363134480612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886047522","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9694008,0.000052640196,0.025248535,0.00007860335,0.000031249645,0.00021830952,0.00012492327,0.000101497404,0.004743502],"genre_scores_gemma":[0.987956,0.00004135762,0.010609535,0.000009856298,0.0000034676589,0.00005829901,0.00006941617,0.0000067484457,0.0012453947],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99953437,0.00013976198,0.000016786036,0.000073664065,0.00017164658,0.00006378085],"domain_scores_gemma":[0.9989956,0.00033028825,0.00004925927,0.0001598686,0.00032764827,0.00013736436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007545048,0.0003600514,0.00028554216,0.00039351406,0.00060793885,0.0005068673,0.00082165125,0.0008471572,0.0045255413],"category_scores_gemma":[0.0011491698,0.00020637033,0.00036421613,0.00020261049,0.00039138377,0.00071263855,0.00046827676,0.0003394584,0.0005554805],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00421475,0.004777323,0.05983571,0.0014295296,0.000119019925,0.0063747736,0.0033332277,0.098428525,0.7021936,0.008341212,0.0029423656,0.1080099],"study_design_scores_gemma":[0.0012097063,0.024419438,0.13630693,0.00020377937,0.00034262825,0.003225116,0.011649475,0.48596346,0.30514693,0.003220139,0.028087676,0.0002248164],"about_ca_topic_score_codex":0.0025947283,"about_ca_topic_score_gemma":0.004533413,"teacher_disagreement_score":0.0045255413,"about_ca_system_score_codex":0.00031561378,"about_ca_system_score_gemma":0.0009190623,"threshold_uncertainty_score":0.015139461},"labels":[],"label_agreement":null},{"id":"W2886799113","doi":"10.1016/j.autcon.2018.08.003","title":"An integrated ergonomics framework for evaluation and design of construction operations","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":37,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; National Research Foundation of Korea; National Science Foundation","keywords":"Visualization; Data collection; Adaptation (eye); Engineering; Human factors and ergonomics; Productivity; Quality (philosophy); Animation; Systems engineering; Computer science; Industrial engineering; Risk analysis (engineering); Poison control; Artificial intelligence","score_opus":0.1099907759759906,"score_gpt":0.49894193591195857,"score_spread":0.38895115993596796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886799113","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006484444,0.00024423617,0.986289,0.00044045565,0.000028445724,0.00041944627,0.00017112827,0.0006902941,0.005232606],"genre_scores_gemma":[0.123858616,0.00021553035,0.87373304,0.00006648055,0.0000158138,0.00056143035,0.00032708677,0.00008574284,0.0011362967],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9915713,0.004025336,0.0010202755,0.00072688353,0.0022538134,0.00040248845],"domain_scores_gemma":[0.99459547,0.0018972302,0.00044513197,0.0006453339,0.002106664,0.00031027247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00860562,0.0018911104,0.0011809786,0.00441076,0.0014082191,0.0075432486,0.0024522685,0.0013557406,0.0034523162],"category_scores_gemma":[0.01008592,0.0008378852,0.0019360044,0.0016804113,0.0029137253,0.0034315556,0.0032682258,0.0012414001,0.0007028215],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021669288,0.0006442561,0.006475995,0.0012873441,0.00036586265,0.00033713333,0.005081305,0.22969456,0.010817287,0.5071546,0.0050919508,0.23283304],"study_design_scores_gemma":[0.00012733486,0.00059033214,0.0054171486,0.0015375221,0.00041823307,0.00029627117,0.003924892,0.6104813,0.0075950334,0.30173445,0.067721866,0.00015560962],"about_ca_topic_score_codex":0.0151184965,"about_ca_topic_score_gemma":0.017331585,"teacher_disagreement_score":0.0151184965,"about_ca_system_score_codex":0.003643566,"about_ca_system_score_gemma":0.008883703,"threshold_uncertainty_score":0.045511365},"labels":[],"label_agreement":null},{"id":"W2888947374","doi":"10.1016/j.autcon.2018.07.009","title":"Automated Crane Planning and Optimization for modular construction","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Modular design; Lift (data mining); Engineering; Plan (archaeology); Modular construction; Lifting equipment; Computer science; Operating system; Mechanical engineering","score_opus":0.008868786673722838,"score_gpt":0.23415949695181468,"score_spread":0.22529071027809183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888947374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0626241,0.00023947355,0.92909396,0.000094446405,0.000022409275,0.000072013485,0.00016934317,0.0009868194,0.0066974163],"genre_scores_gemma":[0.7790719,0.0001593919,0.21659362,0.000022213411,0.000012251476,0.000094338735,0.00025544682,0.00016142911,0.0036293538],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996631,0.00008213151,0.000009987142,0.00006501631,0.00012371957,0.000056092267],"domain_scores_gemma":[0.9996669,0.0001783032,0.000027540429,0.000051417224,0.00005832461,0.00001753074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036358627,0.0006469955,0.0010445969,0.000637525,0.0005443072,0.00074934255,0.00088316156,0.00061378855,0.0041746013],"category_scores_gemma":[0.0012721888,0.00069276517,0.0006628901,0.0007897644,0.00067552185,0.0007035271,0.001020545,0.00078065717,0.0004014332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004385724,0.000025246873,0.00025442132,0.000028448938,0.00001108558,0.000018821596,0.000027714834,0.9597967,0.0011160554,0.0036997613,0.00051461614,0.034463286],"study_design_scores_gemma":[0.0000037420173,0.000008684733,0.00009643144,0.0000016624574,0.000002315846,0.000003980166,0.0000055487326,0.99779105,0.00035302434,0.0014353157,0.00029601654,0.0000022279323],"about_ca_topic_score_codex":0.030714504,"about_ca_topic_score_gemma":0.039862696,"teacher_disagreement_score":0.030714504,"about_ca_system_score_codex":0.0008513896,"about_ca_system_score_gemma":0.0021451183,"threshold_uncertainty_score":0.061071455},"labels":[],"label_agreement":null},{"id":"W2892370834","doi":"10.1016/j.autcon.2018.08.015","title":"Automated assessment of vertical clearance on highways scanned using mobile LiDAR technology","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Alberta Innovates; Ministry of Innovation and Advanced Education","keywords":"Point cloud; Computer science; Overhead (engineering); Segmentation; Bridge (graph theory); Asset (computer security); Real-time computing; Data mining; Transport engineering; Engineering; Artificial intelligence; Computer security","score_opus":0.006909556131538579,"score_gpt":0.2726920054556391,"score_spread":0.2657824493241005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2892370834","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98783606,0.00010668104,0.010429766,0.000015667963,0.000009423924,0.000026083144,0.00027442008,0.0002021377,0.0010998],"genre_scores_gemma":[0.99325657,0.000039146442,0.00627966,0.0000051511156,0.0000031620575,0.0000074996196,0.00018254324,0.000006992734,0.00021914844],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997216,0.00003127844,0.000011129338,0.000049169237,0.00012812889,0.00005872476],"domain_scores_gemma":[0.9996203,0.000050544877,0.00005677052,0.000028383974,0.00021661319,0.000027324313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023871598,0.0002698576,0.00026582344,0.0018311999,0.00029306478,0.0005277495,0.00036758833,0.0005139021,0.0006701503],"category_scores_gemma":[0.00052897376,0.00017064305,0.00019702884,0.00082253135,0.0001616532,0.0003985855,0.00036223404,0.00013888528,0.0003376717],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078077195,0.00033681229,0.3595287,0.00029750806,0.00013488298,0.00085556903,0.00080805237,0.039219502,0.3240633,0.00070963835,0.0018904551,0.27137482],"study_design_scores_gemma":[0.0000437282,0.00051251857,0.6711264,0.000062107465,0.00009905426,0.0005413564,0.0009827771,0.28664073,0.037170522,0.0004900589,0.0022711025,0.00005964745],"about_ca_topic_score_codex":0.005262542,"about_ca_topic_score_gemma":0.0110680675,"teacher_disagreement_score":0.005262542,"about_ca_system_score_codex":0.0002466652,"about_ca_system_score_gemma":0.00046148352,"threshold_uncertainty_score":0.010463834},"labels":[],"label_agreement":null},{"id":"W2899639285","doi":"10.1016/j.autcon.2018.10.020","title":"Data analytics to improve building performance: A critical review","year":2018,"lang":"en","type":"review","venue":"Automation in Construction","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":134,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Carleton University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Analytics; Data science; Computer science; Stakeholder; Building automation; Big data; Data analysis; Automation; Work (physics); Process (computing); Data management; Process management; Engineering; Database; Data mining","score_opus":0.06213737654017069,"score_gpt":0.3378234446033797,"score_spread":0.275686068063209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899639285","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008186217,0.9984347,0.0002925891,0.00053161755,0.00022452933,0.000011991175,0.00004716037,0.00000656337,0.00036893337],"genre_scores_gemma":[0.0009451112,0.99751806,0.0006053839,0.00047849107,0.00026483228,0.000016808412,0.00005138456,0.000003792191,0.000116189585],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99845886,0.00034882248,0.00029840952,0.0002661622,0.00053797994,0.00008975469],"domain_scores_gemma":[0.98738015,0.00907602,0.0008588931,0.0002478994,0.0022091663,0.00022788915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004422882,0.0014767064,0.0025155009,0.00529418,0.0004828776,0.0031917775,0.0017569287,0.0019588014,0.004806866],"category_scores_gemma":[0.013017415,0.00063946686,0.0016147799,0.0064782356,0.0010989682,0.0040648645,0.0016006083,0.0022438264,0.0012433627],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011089767,0.00012712395,0.00071839185,0.08905033,0.00053497555,0.00011028028,0.00015156122,0.00076107256,0.0006846632,0.00854208,0.036963504,0.8622451],"study_design_scores_gemma":[0.000056148863,0.00019637354,0.0017468266,0.07413247,0.001733383,0.00043057482,0.00030714503,0.00060689804,0.0009012892,0.008238643,0.91154355,0.00010667169],"about_ca_topic_score_codex":0.0028175295,"about_ca_topic_score_gemma":0.004829958,"teacher_disagreement_score":0.00529418,"about_ca_system_score_codex":0.0012593978,"about_ca_system_score_gemma":0.0059408606,"threshold_uncertainty_score":0.02339077},"labels":[],"label_agreement":null},{"id":"W2903443973","doi":"10.1016/j.autcon.2018.11.012","title":"Automated post-3D visualization ergonomic analysis system for rapid workplace design in modular construction","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":73,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Alberta","funders":"Skaggs School of Pharmacy and Pharmaceutical Sciences; Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Modular design; Task (project management); Process (computing); Computer science; Compensation (psychology); Work (physics); Engineering; Human–computer interaction; Risk analysis (engineering); Simulation; Systems engineering; Artificial intelligence","score_opus":0.04676176851832592,"score_gpt":0.42360450773556957,"score_spread":0.37684273921724365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903443973","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10019223,0.00025670067,0.8439346,0.00014878614,0.0001183447,0.00036559615,0.0018726843,0.04954091,0.0035702023],"genre_scores_gemma":[0.41755393,0.00025148276,0.5729416,0.00010825164,0.00004525184,0.0005085761,0.0016064687,0.0018396864,0.0051447023],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99951375,0.000075532844,0.000030498444,0.00009929504,0.00023500927,0.000046009616],"domain_scores_gemma":[0.99901843,0.000295255,0.00007266584,0.00016547638,0.0003668993,0.00008122123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064602226,0.0013992644,0.0009280797,0.0013806013,0.0004746755,0.0008474862,0.001128718,0.0006443006,0.01612883],"category_scores_gemma":[0.0013161114,0.00081634166,0.00063967775,0.00048657134,0.00019396738,0.0005643344,0.0013082549,0.0004900425,0.0027300033],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011888614,0.00047078688,0.010688484,0.00064622425,0.00010833686,0.00042253133,0.0013894784,0.016653448,0.2333698,0.0012679441,0.01989116,0.71390295],"study_design_scores_gemma":[0.00037446656,0.0013738947,0.08419196,0.00024732016,0.00031360803,0.0010925753,0.0011065521,0.6480624,0.2031101,0.0034531988,0.056315813,0.00035810756],"about_ca_topic_score_codex":0.0020870108,"about_ca_topic_score_gemma":0.004036143,"teacher_disagreement_score":0.01612883,"about_ca_system_score_codex":0.00028938978,"about_ca_system_score_gemma":0.0010623245,"threshold_uncertainty_score":0.05395633},"labels":[],"label_agreement":null},{"id":"W2905053868","doi":"10.1016/j.autcon.2018.12.006","title":"Deep learning-based automatic volumetric damage quantification using depth camera","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":208,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Spall; Convolutional neural network; Computer science; Artificial intelligence; Pixel; Scanner; Volume (thermodynamics); Deep learning; Computer vision; Pattern recognition (psychology); Structural engineering; Engineering; Physics","score_opus":0.011620638592612689,"score_gpt":0.24567962342278538,"score_spread":0.23405898483017268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905053868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04780543,0.00063141924,0.94651014,0.000117265234,0.00005676983,0.000051799416,0.00043687734,0.002566726,0.001823643],"genre_scores_gemma":[0.72290033,0.0007702954,0.27022982,0.00016758907,0.00005971328,0.000078418,0.0011981055,0.00016760232,0.0044281865],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966955,0.000024195992,0.000012946204,0.000090526184,0.00012901938,0.0000736774],"domain_scores_gemma":[0.9996871,0.00006552068,0.00006783671,0.000048409333,0.00010829654,0.000022889291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028525564,0.0010054024,0.0008126124,0.0014612991,0.0001769232,0.0006881623,0.0011052976,0.00071783713,0.0015426162],"category_scores_gemma":[0.0006703275,0.00058815704,0.0006979463,0.0010114893,0.0003075026,0.0010613662,0.0010216808,0.0009252773,0.00074100995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001526624,0.00020078426,0.0033787917,0.00017427247,0.00009375785,0.00008576743,0.00006061879,0.2232448,0.053303298,0.002219623,0.004642714,0.7124429],"study_design_scores_gemma":[0.0000029848218,0.000024529783,0.0014381361,0.000011629073,0.000011910946,0.00004188441,0.000008828667,0.9884035,0.008259699,0.0011656255,0.00062330713,0.000008035435],"about_ca_topic_score_codex":0.005953727,"about_ca_topic_score_gemma":0.010032165,"teacher_disagreement_score":0.005953727,"about_ca_system_score_codex":0.0005997079,"about_ca_system_score_gemma":0.0007265706,"threshold_uncertainty_score":0.011838138},"labels":[],"label_agreement":null},{"id":"W2905835817","doi":"10.1016/j.autcon.2018.12.015","title":"Pipe radius estimation using Kinect range cameras","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Optical measurement and interference techniques","field":"Computer Science","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Toronto","funders":"Research and Development; Natural Sciences and Engineering Research Council of Canada","keywords":"Ranging; Point cloud; Piping; RADIUS; Rework; Fabrication; Range (aeronautics); Feature (linguistics); Computer science; Engineering; Real-time computing; Computer vision; Artificial intelligence; Mechanical engineering; Embedded system","score_opus":0.035043360938167026,"score_gpt":0.296792024936751,"score_spread":0.261748663998584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905835817","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07232205,0.0005988226,0.91940004,0.00004896428,0.0000631584,0.000062193925,0.00031241367,0.0034315155,0.0037609031],"genre_scores_gemma":[0.66850775,0.000757141,0.3248327,0.000033703654,0.00003177851,0.00008722709,0.0006261781,0.0002316225,0.0048918067],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998898,0.000121985046,0.000051790863,0.0002738078,0.0005751611,0.000079264166],"domain_scores_gemma":[0.9994746,0.00010656409,0.00009198567,0.0000816081,0.00019862255,0.0000467195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040699187,0.0013999569,0.0011285552,0.0021508601,0.00041464326,0.0009913401,0.0008829239,0.0008854977,0.0021243142],"category_scores_gemma":[0.0011095352,0.00081661396,0.000647344,0.0019098532,0.00027547788,0.0012984681,0.0011622399,0.00062225305,0.001969817],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004976865,0.00026812375,0.015228445,0.0004971196,0.00011264831,0.00035445843,0.0002529005,0.07221104,0.1513398,0.0023682069,0.003879768,0.75298977],"study_design_scores_gemma":[0.00003095347,0.00017356164,0.029485505,0.000066624685,0.000067134686,0.00048740435,0.00016602862,0.88993156,0.073099576,0.0014682608,0.004933386,0.00009010882],"about_ca_topic_score_codex":0.0035183246,"about_ca_topic_score_gemma":0.0053519635,"teacher_disagreement_score":0.0035183246,"about_ca_system_score_codex":0.00030996324,"about_ca_system_score_gemma":0.00077764085,"threshold_uncertainty_score":0.0071065426},"labels":[],"label_agreement":null},{"id":"W2911311605","doi":"10.1016/j.autcon.2019.01.010","title":"Building information modelling for off-site construction: Review and future directions","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":410,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Data science; Computer science; Scopus; Prefabrication; Engineering; Civil engineering","score_opus":0.005405755476567432,"score_gpt":0.2094625117056206,"score_spread":0.20405675622905317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911311605","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008572819,0.97358364,0.020321868,0.0011074991,0.00031912798,0.000022403075,0.00012975103,0.00013324947,0.003525092],"genre_scores_gemma":[0.00839352,0.9760878,0.013891498,0.00026620633,0.00035841198,0.000022006681,0.00027383695,0.00003359576,0.00067303365],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99855715,0.0004160761,0.00015630302,0.000248608,0.00055601,0.00006579307],"domain_scores_gemma":[0.9933514,0.004724562,0.0003659807,0.00039966978,0.0010477592,0.00011059894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034843,0.001595707,0.0032558166,0.0039521586,0.0003243372,0.0036842981,0.0045131226,0.0024781665,0.003640126],"category_scores_gemma":[0.005796632,0.00092772656,0.0015351387,0.007139662,0.0016049157,0.0056124628,0.001560508,0.001736597,0.0020853619],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039263326,0.00009305455,0.0008424166,0.01946978,0.00015886172,0.000086730346,0.00017090738,0.011383438,0.0006400095,0.02569725,0.011483764,0.9299345],"study_design_scores_gemma":[0.000023006723,0.000115708404,0.002064864,0.01973912,0.00054203183,0.0010956686,0.00051760935,0.02798498,0.0020272522,0.04945749,0.89624953,0.00018271997],"about_ca_topic_score_codex":0.005149693,"about_ca_topic_score_gemma":0.0044618114,"teacher_disagreement_score":0.005149693,"about_ca_system_score_codex":0.0013679503,"about_ca_system_score_gemma":0.0030205445,"threshold_uncertainty_score":0.018426955},"labels":[],"label_agreement":null},{"id":"W2913697492","doi":"10.1016/j.autcon.2019.01.017","title":"Sewer damage detection from imbalanced CCTV inspection data using deep convolutional neural networks with hierarchical classification","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":175,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Fundamental Research Funds for the Central Universities","keywords":"Convolutional neural network; Artificial intelligence; Computer science; Deep learning; Process (computing); Offset (computer science); Pattern recognition (psychology); Contextual image classification; Machine learning; Artificial neural network; Image (mathematics)","score_opus":0.011657552658617303,"score_gpt":0.22272237100276954,"score_spread":0.21106481834415222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2913697492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8153595,0.00134673,0.16775906,0.0005909813,0.00028552883,0.00010189786,0.0055635194,0.004449412,0.004543346],"genre_scores_gemma":[0.97215974,0.00017850728,0.018861277,0.00008368208,0.0000637483,0.00003646238,0.0057097687,0.00005448284,0.0028522706],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970967,0.00002263608,0.0000113567,0.000090353875,0.00006937039,0.00009666221],"domain_scores_gemma":[0.999668,0.000073453484,0.000051224935,0.000057456535,0.000121918856,0.000027962637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027024152,0.0009078818,0.0006696316,0.0014307902,0.00025282157,0.00045415678,0.0007129978,0.0006532553,0.0010120287],"category_scores_gemma":[0.0007711242,0.0002997246,0.0006101229,0.001028131,0.00020546521,0.0005953912,0.0008365975,0.0008423846,0.00065596664],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010307247,0.0011302578,0.08231793,0.00022177618,0.00031036002,0.0005809137,0.00016513729,0.22612895,0.04121847,0.0011930857,0.024011802,0.6216906],"study_design_scores_gemma":[0.000008904249,0.000040050498,0.016055364,0.000012590748,0.00002916007,0.00003329384,0.000036552778,0.978458,0.003976371,0.0006055082,0.00073392945,0.000010242201],"about_ca_topic_score_codex":0.024014171,"about_ca_topic_score_gemma":0.041158527,"teacher_disagreement_score":0.024014171,"about_ca_system_score_codex":0.0006176208,"about_ca_system_score_gemma":0.0007271002,"threshold_uncertainty_score":0.047748804},"labels":[],"label_agreement":null},{"id":"W2942087840","doi":"10.1016/j.autcon.2019.03.015","title":"Auction-based Simulation for Industrial Crane Operations","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada; University of Tehran","keywords":"Schedule; Modular design; Lift (data mining); Computer science; Scheduling (production processes); Industrial engineering; Operations research; Engineering; Operating system; Operations management","score_opus":0.017088253336062,"score_gpt":0.24601417772792644,"score_spread":0.22892592439186443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942087840","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7484033,0.0003380312,0.22682384,0.000512641,0.0001789125,0.00017856134,0.0008581994,0.001114208,0.02159233],"genre_scores_gemma":[0.98923165,0.00003796872,0.009283886,0.000021347367,0.0000061459427,0.00004153878,0.0001191501,0.00003000836,0.0012283325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996939,0.00013951206,0.000016956623,0.00003702301,0.000057476824,0.0000552078],"domain_scores_gemma":[0.99763465,0.0017832966,0.00009111597,0.00010647468,0.00026187662,0.00012263474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067321974,0.0005092912,0.0011804327,0.00051227375,0.0005268111,0.0008369939,0.0012026471,0.0013664166,0.005085069],"category_scores_gemma":[0.0025058456,0.00049645436,0.0006932433,0.0005073932,0.00058207975,0.0005768685,0.00061762816,0.00088483223,0.0002684744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004518812,0.000033972654,0.00020263618,0.00000830542,0.000006089283,0.000012306908,0.000006857323,0.99812835,0.000105449595,0.0006434743,0.00007273811,0.00073459424],"study_design_scores_gemma":[0.0000063593097,0.000005872886,0.000028689377,5.20203e-7,9.535786e-7,9.478069e-7,0.000001710482,0.9997224,0.00004659607,0.00015848804,0.000026447695,9.723027e-7],"about_ca_topic_score_codex":0.04012612,"about_ca_topic_score_gemma":0.02045215,"teacher_disagreement_score":0.04012612,"about_ca_system_score_codex":0.0010905255,"about_ca_system_score_gemma":0.0014319058,"threshold_uncertainty_score":0.07978511},"labels":[],"label_agreement":null},{"id":"W2942829360","doi":"10.1016/j.autcon.2019.04.002","title":"Development and implementation of automated fault detection and diagnostics for building systems: A review","year":2019,"lang":"en","type":"review","venue":"Automation in Construction","topic":"Fault Detection and Control Systems","field":"Engineering","cited_by":139,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; National Research Council Canada","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Benchmarking; Workflow; Interoperability; Computer science; Systems engineering; Fault detection and isolation; Fault (geology); Scalability; Software engineering; Data science; Engineering; Risk analysis (engineering); Artificial intelligence; Database","score_opus":0.021319989246009988,"score_gpt":0.31875723339335754,"score_spread":0.29743724414734757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942829360","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00017431226,0.9983448,0.0006526949,0.00011737577,0.00009998453,0.000011816922,0.00002728523,0.000010424042,0.0005613394],"genre_scores_gemma":[0.0009504077,0.9975432,0.0009921049,0.00012945227,0.000099569435,0.000009047757,0.000041417552,0.0000025987556,0.0002322932],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919444,0.000110882705,0.00014619887,0.00016280774,0.00033224403,0.00005354165],"domain_scores_gemma":[0.9970481,0.0017300205,0.0004248255,0.00009533088,0.00062616274,0.00007568377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019584098,0.0014160938,0.0020646516,0.0038100719,0.00027618397,0.001538303,0.0020219109,0.0017560533,0.003160321],"category_scores_gemma":[0.0029424168,0.0006351301,0.0011379935,0.003777037,0.0006101572,0.0020547074,0.0009178004,0.0012995983,0.0012485273],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058560294,0.00012978078,0.0002713902,0.042321585,0.00014020367,0.00008335178,0.000054454733,0.0011627057,0.002096893,0.0035875593,0.008731419,0.94136214],"study_design_scores_gemma":[0.000042471,0.0005578286,0.0021765174,0.019583791,0.0008502346,0.0010352314,0.00015402977,0.0009185695,0.0034636592,0.0034495357,0.967683,0.00008510989],"about_ca_topic_score_codex":0.0027864445,"about_ca_topic_score_gemma":0.00317165,"teacher_disagreement_score":0.0038100719,"about_ca_system_score_codex":0.0008374418,"about_ca_system_score_gemma":0.0028025883,"threshold_uncertainty_score":0.010572374},"labels":[],"label_agreement":null},{"id":"W2945689285","doi":"10.1016/j.autcon.2019.04.014","title":"Segment-based pavement crack quantification","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Wuhan University; National Natural Science Foundation of China","keywords":"Enhanced Data Rates for GSM Evolution; Segmentation; Pixel; Edge detection; Grayscale; Fracture mechanics; Structural engineering; Computer science; Materials science; Image processing; Artificial intelligence; Image (mathematics); Engineering","score_opus":0.005903485132817769,"score_gpt":0.21066996157755405,"score_spread":0.20476647644473628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945689285","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23789367,0.00029959332,0.75231725,0.000053276395,0.000027121436,0.00007914288,0.0012225405,0.005039163,0.0030682173],"genre_scores_gemma":[0.8481509,0.0001167664,0.14799044,0.000016616337,0.000019687915,0.000037631366,0.0015154459,0.00014801367,0.0020044248],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999548,0.00005856888,0.000019049414,0.00012380033,0.00018553958,0.00006504244],"domain_scores_gemma":[0.99918133,0.00019303299,0.00011573704,0.00016403776,0.00030579985,0.00004005548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003670769,0.0006443488,0.00063079,0.0023158423,0.00024303929,0.00089222105,0.0007816412,0.00075245346,0.0030330701],"category_scores_gemma":[0.0011809692,0.00030690394,0.00040724166,0.0012490448,0.00029751536,0.00097489,0.00088725484,0.00043284328,0.0011716494],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006384279,0.00022321087,0.029425092,0.0002636654,0.00015132253,0.00012921706,0.00018928075,0.22077903,0.1537435,0.0034253355,0.0037546277,0.5872773],"study_design_scores_gemma":[0.000004971399,0.000062178144,0.012897073,0.000009670406,0.000021918864,0.00006520851,0.000031206033,0.96482307,0.020052101,0.0010211131,0.0009942816,0.000017105041],"about_ca_topic_score_codex":0.003980982,"about_ca_topic_score_gemma":0.006046473,"teacher_disagreement_score":0.003980982,"about_ca_system_score_codex":0.0003273202,"about_ca_system_score_gemma":0.00043884426,"threshold_uncertainty_score":0.010146618},"labels":[],"label_agreement":null},{"id":"W2958068595","doi":"10.1016/j.autcon.2019.102896","title":"Simulating multi-agent narratives for pre-occupancy evaluation of architectural designs","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Evacuation and Crowd Dynamics","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"European Research Council; Azrieli Foundation; Israel Science Foundation","keywords":"Narrative; Scalability; Occupancy; Computer science; Post-occupancy evaluation; Key (lock); Work (physics); Systems engineering; Data science; Human–computer interaction; Architectural engineering; Software engineering; Simulation; Engineering; Database; Computer security","score_opus":0.04165951146930039,"score_gpt":0.33165894399550017,"score_spread":0.28999943252619975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2958068595","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75840604,0.00017376117,0.22222008,0.0004549579,0.00010045865,0.00042101907,0.00074387784,0.0009076883,0.016572073],"genre_scores_gemma":[0.9459614,0.000054382577,0.05177087,0.000023552317,0.0000063263856,0.00014476152,0.00028072874,0.00005707023,0.0017009092],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941003,0.000359573,0.000022841521,0.00006011928,0.00009255476,0.000054807344],"domain_scores_gemma":[0.9932777,0.005668889,0.00026371054,0.0003043667,0.00023419027,0.0002511012],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011246267,0.00091654074,0.00043283383,0.0005894158,0.000670982,0.0014138394,0.0013280034,0.0013992172,0.007094967],"category_scores_gemma":[0.007598678,0.0005956412,0.0005880203,0.0003596602,0.00091463944,0.0012257483,0.001793413,0.0008997696,0.00036410862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027160964,0.00020699637,0.0025995236,0.0001037627,0.00003592981,0.00027444854,0.0016232673,0.97430056,0.0018808137,0.0086973,0.0007312502,0.009274577],"study_design_scores_gemma":[0.000032368873,0.000046123754,0.0002668648,0.000011625856,0.0000065169565,0.000011026176,0.00026468426,0.9959902,0.0005449493,0.0020080083,0.000809572,0.000007932719],"about_ca_topic_score_codex":0.00928922,"about_ca_topic_score_gemma":0.017227883,"teacher_disagreement_score":0.00928922,"about_ca_system_score_codex":0.0013498861,"about_ca_system_score_gemma":0.0011399194,"threshold_uncertainty_score":0.023735046},"labels":[],"label_agreement":null},{"id":"W2981493332","doi":"10.1016/j.autcon.2019.102959","title":"Self-reconfigurable façade-cleaning robot equipped with deep-learning-based crack detection based on convolutional neural networks","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Singapore University of Technology and Design","keywords":"Convolutional neural network; Process (computing); Robot; Artificial intelligence; Deep learning; Computer science; Modular design; Set (abstract data type); Machine vision; Artificial neural network; Simulation; Computer vision","score_opus":0.0028470416579079692,"score_gpt":0.1770887899265385,"score_spread":0.17424174826863054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2981493332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17382571,0.00064732425,0.80495274,0.00027221147,0.00014975808,0.00014125457,0.00023230427,0.010169811,0.009608834],"genre_scores_gemma":[0.8665821,0.00017287339,0.1259539,0.00013519956,0.00001713805,0.00013155804,0.00033393002,0.00009181789,0.0065815267],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99988556,0.000005299946,0.0000041581347,0.000041984702,0.00003776997,0.000025213883],"domain_scores_gemma":[0.99988306,0.000018209565,0.000024874815,0.000020446327,0.000038131322,0.000015169328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013172343,0.000664465,0.0004016981,0.0002634957,0.00020497406,0.00028996423,0.001042981,0.0005556521,0.0016314393],"category_scores_gemma":[0.0002795644,0.00032312027,0.00040373008,0.00015335987,0.00026617342,0.0004015888,0.0004929728,0.0005334373,0.00052589853],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029334583,0.0002086328,0.004174571,0.0002539892,0.00012435557,0.00034773827,0.0001078964,0.5590167,0.11131103,0.001846589,0.0042544557,0.31806064],"study_design_scores_gemma":[0.000008251385,0.00009751568,0.0014375307,0.000011951591,0.000018653076,0.000053648793,0.000008305789,0.9820894,0.014559019,0.0002979876,0.0014044609,0.000013358864],"about_ca_topic_score_codex":0.007706411,"about_ca_topic_score_gemma":0.00809122,"teacher_disagreement_score":0.007706411,"about_ca_system_score_codex":0.00048844155,"about_ca_system_score_gemma":0.0007357996,"threshold_uncertainty_score":0.0153231025},"labels":[],"label_agreement":null},{"id":"W2983459912","doi":"10.1016/j.autcon.2019.102935","title":"Impact of augmented reality and spatial cognition on assembly in construction","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Augmented Reality Applications","field":"Computer Science","cited_by":109,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Augmented reality; Rework; Workflow; Cognition; Interface (matter); Virtual reality; Human–computer interaction; Relation (database); Engineering; Computer science; Simulation; Psychology; Data mining","score_opus":0.013783968997259373,"score_gpt":0.29093448579187436,"score_spread":0.277150516794615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2983459912","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89459574,0.0010299251,0.026110694,0.00051376683,0.00008051233,0.000029508314,0.00010988979,0.0001786907,0.07735127],"genre_scores_gemma":[0.99607927,0.00015823808,0.0023971212,0.000014194036,0.00000856394,0.0000058833853,0.000020302296,0.000016468388,0.0013000331],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9981846,0.0007218739,0.00009268129,0.00026631352,0.00053511036,0.00019935178],"domain_scores_gemma":[0.9938645,0.003984525,0.0006992122,0.0006208128,0.00063662685,0.00019436292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010942917,0.0007675451,0.00031039855,0.001243709,0.0007598045,0.0056954366,0.0007008043,0.0010020664,0.011421369],"category_scores_gemma":[0.010611807,0.00042095184,0.00079349725,0.0007745576,0.003109944,0.002996344,0.0030811864,0.0006978123,0.00047632676],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0074184844,0.0016433947,0.10302463,0.0019569732,0.0007183183,0.0029059502,0.06551561,0.08887204,0.077449895,0.18462709,0.0027405838,0.46312705],"study_design_scores_gemma":[0.0004007906,0.0038033517,0.58399236,0.0008532303,0.0013777178,0.00302953,0.06911822,0.12751925,0.037631586,0.13543479,0.03626638,0.0005728446],"about_ca_topic_score_codex":0.009659933,"about_ca_topic_score_gemma":0.0071919323,"teacher_disagreement_score":0.011421369,"about_ca_system_score_codex":0.0010478182,"about_ca_system_score_gemma":0.0009751767,"threshold_uncertainty_score":0.038208306},"labels":[],"label_agreement":null},{"id":"W2986327238","doi":"10.1016/j.autcon.2019.102976","title":"Impact of a visual decision support tool in project control: A comparative study using eye tracking","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Human-Automation Interaction and Safety","field":"Psychology","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"HEC Montréal; Prompt (Canada); Polytechnique Montréal; Natural Sciences and Engineering Research Council of Canada; SNC-Lavalin (Canada)","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Eye tracking; Decision support system; Control (management); Computer science; Planner; Representation (politics); Artificial intelligence; Machine learning; Human–computer interaction; Operations research; Engineering","score_opus":0.050170788892136255,"score_gpt":0.4716780031802642,"score_spread":0.42150721428812793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2986327238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99886715,0.00004020793,0.00040175143,0.0000074598333,0.0000026108278,0.000015379659,0.000010311913,0.0000044239882,0.0006505857],"genre_scores_gemma":[0.99924785,0.000035827954,0.0004000726,0.000009789223,0.0000021010317,0.000015520127,0.000013781906,0.000003606007,0.0002713386],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99879646,0.00055005803,0.000089177964,0.00011842123,0.00032367048,0.00012224082],"domain_scores_gemma":[0.9910013,0.006544383,0.0007941217,0.0003905901,0.00097623694,0.00029336504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019221389,0.00029293264,0.00027484013,0.00089689955,0.00039623358,0.0008548888,0.0003517525,0.0006053238,0.0014296876],"category_scores_gemma":[0.015162645,0.00018019098,0.00026045745,0.0004185267,0.0004274224,0.0008203373,0.00060227665,0.00031897606,0.00014571856],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.024726959,0.015074975,0.38484436,0.0012251901,0.00048654192,0.0017361261,0.03658506,0.0056159603,0.250628,0.0015255954,0.0009271471,0.27662408],"study_design_scores_gemma":[0.00035604183,0.0186341,0.93777937,0.00012516005,0.00033706086,0.00075496646,0.014862692,0.008905971,0.015591757,0.00044194868,0.0021149735,0.000096050324],"about_ca_topic_score_codex":0.0037433729,"about_ca_topic_score_gemma":0.002500883,"teacher_disagreement_score":0.0037433729,"about_ca_system_score_codex":0.00039944798,"about_ca_system_score_gemma":0.0005110452,"threshold_uncertainty_score":0.010165393},"labels":[],"label_agreement":null},{"id":"W2994999390","doi":"10.1016/j.autcon.2019.103045","title":"Automated excavators activity recognition and productivity analysis from construction site surveillance videos","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":191,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Mitacs","keywords":"Excavator; Productivity; Schedule; Activity recognition; Track (disk drive); Computer science; Engineering; Artificial intelligence; Civil engineering","score_opus":0.043856600459135066,"score_gpt":0.3887072293241019,"score_spread":0.3448506288649668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994999390","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.799428,0.0010026459,0.18613833,0.00015708113,0.0001162626,0.00020232708,0.0044852523,0.002213327,0.0062568486],"genre_scores_gemma":[0.9176907,0.0006554478,0.07246972,0.000044810648,0.00009386863,0.00010497509,0.0044269906,0.00008214083,0.004431318],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.999724,0.000020514359,0.0000109839375,0.00007643118,0.000111610665,0.000056443896],"domain_scores_gemma":[0.99962056,0.000090161535,0.00006468478,0.000030443203,0.00015746165,0.000036700334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022235232,0.00044205305,0.00037668995,0.0027293283,0.00014671037,0.0004887543,0.0003882591,0.0005178117,0.0013517103],"category_scores_gemma":[0.0007299341,0.00016421083,0.0002925564,0.0011736053,0.00011888112,0.00033232788,0.0003871549,0.0002448222,0.0009715067],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005664204,0.00029298718,0.03357012,0.00034968974,0.000065691944,0.00054876605,0.0002451969,0.006211824,0.195454,0.00036487816,0.005651451,0.75667894],"study_design_scores_gemma":[0.000054752894,0.00037396673,0.51640356,0.00012429009,0.00013054888,0.0013835742,0.0008958134,0.38465437,0.0858814,0.00076846394,0.009261346,0.00006792541],"about_ca_topic_score_codex":0.0033052897,"about_ca_topic_score_gemma":0.0053423764,"teacher_disagreement_score":0.0033052897,"about_ca_system_score_codex":0.00014691197,"about_ca_system_score_gemma":0.00030583577,"threshold_uncertainty_score":0.0065720677},"labels":[],"label_agreement":null},{"id":"W2998429966","doi":"10.1016/j.autcon.2019.103065","title":"BIM-based decision support system for automated manufacturability check of wood frame assemblies","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Design for manufacturability; Manufacturing engineering; Frame (networking); Automation; Product (mathematics); Process (computing); Factory (object-oriented programming); Building information modeling; Engineering; Software; Systems engineering; Computer science; Mechanical engineering; Operations management","score_opus":0.007398810980768447,"score_gpt":0.23277141251110978,"score_spread":0.22537260153034133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2998429966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15116495,0.00047046907,0.73728704,0.00032281253,0.00021146207,0.0004911601,0.0038386467,0.09514034,0.011073119],"genre_scores_gemma":[0.77071136,0.00024846426,0.21566182,0.00025516964,0.000062428735,0.00041946466,0.004634722,0.00066050515,0.007346134],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926287,0.0001295035,0.00006854895,0.00013474342,0.0003292707,0.0000750881],"domain_scores_gemma":[0.9992052,0.00018261973,0.00007755707,0.00014458319,0.00030538192,0.00008467228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009861623,0.00092818897,0.0012130783,0.0018961366,0.00055063545,0.0011718927,0.0014318124,0.00087093486,0.009149884],"category_scores_gemma":[0.0017519472,0.00052674813,0.00046676595,0.0008613392,0.00022451652,0.00088285573,0.0010131182,0.00043299785,0.0031539116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030735945,0.0012678899,0.0077262903,0.0005249827,0.000196015,0.0013583526,0.00047987123,0.09240079,0.10801744,0.0051858677,0.051901724,0.72786725],"study_design_scores_gemma":[0.00018880493,0.00024804712,0.0050985166,0.000051203922,0.00009697486,0.0003423628,0.00011494938,0.9266389,0.05041113,0.0021776967,0.014546266,0.00008509651],"about_ca_topic_score_codex":0.0024507479,"about_ca_topic_score_gemma":0.0020531593,"teacher_disagreement_score":0.009149884,"about_ca_system_score_codex":0.00043150087,"about_ca_system_score_gemma":0.00096109987,"threshold_uncertainty_score":0.03060937},"labels":[],"label_agreement":null},{"id":"W2999234604","doi":"10.1016/j.autcon.2020.103083","title":"Automated rigging design for heavy industrial lifts","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; North Carolina Space Grant","keywords":"Modular design; Lift (data mining); Engineering; Offset (computer science); Lifting equipment; Reliability engineering; Computer science; Simulation; Mechanical engineering; Operating system","score_opus":0.04070489391244067,"score_gpt":0.2403540588214327,"score_spread":0.19964916490899204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2999234604","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10556074,0.00020181613,0.8786302,0.0000625323,0.000042775784,0.00014774974,0.00010375288,0.0026184896,0.012631848],"genre_scores_gemma":[0.7854578,0.00011604305,0.20855112,0.000019634437,0.000009610782,0.000061665094,0.00019344206,0.00024435416,0.0053463457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990115,0.00019749042,0.000033575274,0.00009573484,0.000548083,0.000113605354],"domain_scores_gemma":[0.9995059,0.00011032975,0.000052340863,0.00017929338,0.00012659346,0.000025652052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007667102,0.000953608,0.0008052349,0.00067273807,0.00065859297,0.0011422227,0.0009587813,0.0007700091,0.0059597353],"category_scores_gemma":[0.0008592264,0.00060398417,0.00065809226,0.000406608,0.00057817134,0.0006417258,0.0012282529,0.0007765094,0.0012063656],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005214662,0.00017540746,0.0019459408,0.0003242469,0.00004128449,0.00023371552,0.00037461318,0.5430322,0.11467227,0.012502378,0.0021145802,0.32406187],"study_design_scores_gemma":[0.000049711947,0.0004447568,0.0017794758,0.00005050992,0.00002675561,0.00015901284,0.000115384406,0.9433546,0.035222072,0.0055299145,0.0132292025,0.000038568443],"about_ca_topic_score_codex":0.0021407786,"about_ca_topic_score_gemma":0.0036002917,"teacher_disagreement_score":0.0059597353,"about_ca_system_score_codex":0.0004532801,"about_ca_system_score_gemma":0.0012129233,"threshold_uncertainty_score":0.019937336},"labels":[],"label_agreement":null},{"id":"W3005260446","doi":"10.1016/j.autcon.2020.103076","title":"Chronographical spatiotemporal dynamic 4D planning","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Gantt chart; Building information modeling; Process (computing); Computer science; Schedule; Set (abstract data type); Dimension (graph theory); Project management; Industrial engineering; Simulation modeling; Systems engineering; Software engineering; Simulation; Scheduling (production processes); Engineering","score_opus":0.009941865573041726,"score_gpt":0.22209299910106778,"score_spread":0.21215113352802606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005260446","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014851938,0.0014279584,0.8609032,0.00046904234,0.000794183,0.00037670464,0.009254062,0.003802841,0.10812003],"genre_scores_gemma":[0.21501735,0.0033073495,0.7335008,0.00017078489,0.00009529155,0.00045833475,0.013097375,0.001112523,0.03324024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993536,0.00010235559,0.00005968971,0.00015980133,0.00025513544,0.0000693486],"domain_scores_gemma":[0.9992648,0.00013703418,0.00005555537,0.00021900004,0.0002812204,0.000042456064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005068229,0.000773953,0.00047160508,0.0028655843,0.0013427825,0.0025376398,0.0010312059,0.00058747997,0.035534132],"category_scores_gemma":[0.0021561165,0.00068104616,0.0006450855,0.005058453,0.001042671,0.0020910765,0.0022383044,0.0008265801,0.005715782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047871188,0.00007643839,0.0041389433,0.0008029407,0.00006514955,0.0007587958,0.0013896909,0.103576615,0.010336709,0.48810694,0.048561193,0.34170786],"study_design_scores_gemma":[0.00004441476,0.00011145335,0.0030950515,0.00037337167,0.000068252724,0.0007225878,0.0012087026,0.12765731,0.012406725,0.17798582,0.67620206,0.00012414847],"about_ca_topic_score_codex":0.021172727,"about_ca_topic_score_gemma":0.04331993,"teacher_disagreement_score":0.035534132,"about_ca_system_score_codex":0.0009357963,"about_ca_system_score_gemma":0.0022873844,"threshold_uncertainty_score":0.11887354},"labels":[],"label_agreement":null},{"id":"W3013060269","doi":"10.1016/j.autcon.2020.103175","title":"Evaluating industrial modularization strategies: Local vs. overseas fabrication","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Modular programming; Modular design; Quality (philosophy); Automation; Fabrication; Engineering; Manufacturing engineering; Systems engineering; Outsourcing; Computer science; Mechanical engineering; Business","score_opus":0.04111430657511869,"score_gpt":0.26990582990104506,"score_spread":0.22879152332592637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013060269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9928185,0.00013139678,0.002689431,0.000022240385,0.0000059177205,0.00009717166,0.0000650088,0.000025276348,0.004145034],"genre_scores_gemma":[0.9950311,0.000119992284,0.004061591,0.000012655732,0.000003829721,0.000050434126,0.00010411488,0.000011997139,0.0006041836],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99720097,0.0013912934,0.00012877666,0.0003036302,0.0007167415,0.00025865395],"domain_scores_gemma":[0.9921279,0.0044480325,0.001056778,0.00054913375,0.0013910822,0.0004270903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062784827,0.0009343414,0.0005527491,0.0013600626,0.00040115928,0.0017888244,0.000640548,0.0008832668,0.002801609],"category_scores_gemma":[0.011168822,0.00021214936,0.0005532467,0.001336637,0.0006204028,0.001954222,0.0009195085,0.0004729056,0.0004754907],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.017239815,0.0065250644,0.23492531,0.0010366783,0.0010535732,0.00026118333,0.0019687542,0.23140392,0.04033876,0.009296301,0.0012671197,0.45468357],"study_design_scores_gemma":[0.0016612975,0.06312696,0.4598874,0.00040371035,0.0026346606,0.00031332608,0.009190881,0.3643312,0.082933605,0.006605675,0.008731681,0.00017957369],"about_ca_topic_score_codex":0.0044229887,"about_ca_topic_score_gemma":0.011663989,"teacher_disagreement_score":0.0062784827,"about_ca_system_score_codex":0.0019423751,"about_ca_system_score_gemma":0.0014693743,"threshold_uncertainty_score":0.033204198},"labels":[],"label_agreement":null},{"id":"W3026393200","doi":"10.1016/j.autcon.2020.103250","title":"LiDAR-equipped UAV path planning considering potential locations of defects for bridge inspection","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":207,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Visibility; Lidar; Bridge (graph theory); Computer science; Path (computing); Motion planning; Viewpoints; Ranging; Sampling (signal processing); Real-time computing; Genetic algorithm; Computer vision; Artificial intelligence; Simulation; Remote sensing; Robot; Machine learning","score_opus":0.014479472656976956,"score_gpt":0.23642020468384267,"score_spread":0.2219407320268657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3026393200","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24445885,0.00057927606,0.75006276,0.00019353679,0.00007019211,0.00008527691,0.00033109562,0.0005392132,0.0036797964],"genre_scores_gemma":[0.91765857,0.00017280012,0.08102622,0.00002195108,0.000010218126,0.000042944615,0.00021086015,0.000023913677,0.00083256146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998485,0.000032968543,0.0000055192518,0.000036210655,0.00004005613,0.000036793448],"domain_scores_gemma":[0.9997762,0.000088398956,0.00003180111,0.000020610187,0.00006080162,0.000022252792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002791292,0.0005124457,0.00046015016,0.0005169959,0.00028280495,0.0004924616,0.00065909995,0.0006881419,0.0010505159],"category_scores_gemma":[0.0011142322,0.00050206267,0.0005141032,0.00052903127,0.00022728811,0.00061707065,0.0005637062,0.0003668906,0.00018617038],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000111158384,0.000052700245,0.0030758874,0.00010081157,0.0000313825,0.00042424945,0.000098528406,0.922839,0.0063607385,0.0016697356,0.0012300288,0.06400588],"study_design_scores_gemma":[0.0000047449225,0.000033772194,0.0005860432,0.0000051925063,0.0000072373305,0.000035703317,0.00003136701,0.9978612,0.0006370243,0.0006109431,0.00018327987,0.0000035120854],"about_ca_topic_score_codex":0.008062076,"about_ca_topic_score_gemma":0.011025784,"teacher_disagreement_score":0.008062076,"about_ca_system_score_codex":0.0002917178,"about_ca_system_score_gemma":0.00111253,"threshold_uncertainty_score":0.016030252},"labels":[],"label_agreement":null},{"id":"W3033110589","doi":"10.1016/j.autcon.2020.103257","title":"Building automation system - BIM integration using a linked data structure","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University; Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Research Foundation","keywords":"Building information modeling; Automation; Systems engineering; Engineering; System integration; Building automation; Computer science; Construction engineering; Manufacturing engineering; Software engineering; Database; Operations management; Mechanical engineering","score_opus":0.030483981159701218,"score_gpt":0.25483156291155845,"score_spread":0.22434758175185723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033110589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030038785,0.00017551478,0.9306874,0.00031848313,0.000116800264,0.00037149995,0.002212237,0.017485842,0.018593334],"genre_scores_gemma":[0.42220247,0.00032416187,0.5535091,0.00024987574,0.000065163906,0.00043257742,0.01116247,0.0009034417,0.011150679],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9973049,0.0004925751,0.00024803024,0.00032425718,0.0014759626,0.00015426594],"domain_scores_gemma":[0.9985807,0.00026533572,0.000097673015,0.00051323435,0.0004726083,0.00007043039],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022147852,0.00062622194,0.00069082424,0.0036262032,0.0010535747,0.004138236,0.0012575621,0.0011233991,0.0051640794],"category_scores_gemma":[0.0035676518,0.0006459893,0.0010705598,0.0031144666,0.0006617425,0.0032416803,0.0031612706,0.0010187577,0.0031069044],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069811504,0.0012840643,0.015606233,0.0006543234,0.0004724683,0.0009158687,0.0017112899,0.11979127,0.049944967,0.20993415,0.03258815,0.56639916],"study_design_scores_gemma":[0.00015889002,0.0002999715,0.009658393,0.00024575475,0.0003460724,0.0005906527,0.00048160198,0.6764261,0.11596935,0.061950512,0.13368116,0.00019152019],"about_ca_topic_score_codex":0.00541625,"about_ca_topic_score_gemma":0.0051304325,"teacher_disagreement_score":0.00541625,"about_ca_system_score_codex":0.0011506934,"about_ca_system_score_gemma":0.002723902,"threshold_uncertainty_score":0.017275572},"labels":[],"label_agreement":null},{"id":"W3033645921","doi":"10.1016/j.autcon.2020.103291","title":"Hybrid pixel-level concrete crack segmentation and quantification across complex backgrounds using deep learning","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":395,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Research Manitoba","keywords":"Pixel; Intersection (aeronautics); Segmentation; Convolutional neural network; Artificial intelligence; Computer science; Algorithm; Bounding overwatch; Computer vision; Pattern recognition (psychology); Engineering","score_opus":0.04331559413787201,"score_gpt":0.2807973856158583,"score_spread":0.23748179147798631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033645921","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08886816,0.0003451424,0.90487194,0.00019642679,0.000040821564,0.00004712939,0.00041513555,0.0027904394,0.0024247374],"genre_scores_gemma":[0.6427534,0.00034393065,0.34804317,0.00025999665,0.00006141904,0.00006728626,0.0017388292,0.00035276668,0.0063791256],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997118,0.000020676127,0.000009865076,0.00011283535,0.000078170844,0.00006661967],"domain_scores_gemma":[0.9996518,0.00009266186,0.000043421536,0.00006462723,0.00010991932,0.00003771133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038467473,0.0009109309,0.00087642914,0.0014569971,0.0003121048,0.0010933309,0.001269622,0.0013203217,0.002016007],"category_scores_gemma":[0.0007635331,0.00055306085,0.0007889272,0.0010002552,0.0004551352,0.0013355598,0.0015257413,0.0010842775,0.0009929962],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042677115,0.00039915586,0.005867916,0.00017887475,0.0001713886,0.00018790587,0.00014525487,0.31494954,0.08658944,0.003994914,0.0046608825,0.582428],"study_design_scores_gemma":[0.0000035777414,0.000016405462,0.001043377,0.0000071171635,0.000011492135,0.00002602767,0.000012014024,0.9912971,0.00568962,0.001436504,0.0004499855,0.0000068587738],"about_ca_topic_score_codex":0.0077096205,"about_ca_topic_score_gemma":0.017414298,"teacher_disagreement_score":0.0077096205,"about_ca_system_score_codex":0.00057792815,"about_ca_system_score_gemma":0.0009366451,"threshold_uncertainty_score":0.01532948},"labels":[],"label_agreement":null},{"id":"W3043460766","doi":"10.1016/j.autcon.2020.103348","title":"Neuro-fuzzy systems in construction engineering and management research","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Neural Networks and Applications","field":"Computer Science","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Interpretability; Computer science; Fuzzy logic; Identification (biology); Maxima and minima; Convergence (economics); Machine learning; Fuzzy set; Artificial intelligence; Management science; Industrial engineering; Data mining; Engineering; Mathematics","score_opus":0.03236979421865804,"score_gpt":0.271942178678385,"score_spread":0.23957238445972695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043460766","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051788785,0.3896098,0.39807373,0.019812563,0.0020556585,0.00028024212,0.00050491566,0.00024194647,0.13763231],"genre_scores_gemma":[0.68751425,0.16137023,0.13962385,0.0018354511,0.0008296797,0.00026511934,0.00024770957,0.000024339497,0.008289433],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9982626,0.0007515569,0.0001350332,0.00016539913,0.000612755,0.0000726622],"domain_scores_gemma":[0.9979254,0.0013589831,0.00021608017,0.00008748347,0.0003670561,0.00004504234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033465105,0.0004934124,0.0006939483,0.002802843,0.0008703546,0.0025313173,0.0008079223,0.0017079487,0.0022780686],"category_scores_gemma":[0.004426997,0.00019680746,0.0005657648,0.004124221,0.0018625249,0.0022996815,0.0009335486,0.0012050058,0.00031881977],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005899086,0.000095305666,0.006299035,0.0029184916,0.00023861084,0.00038472927,0.0012758217,0.07037049,0.0010717165,0.4803463,0.0071136146,0.42982686],"study_design_scores_gemma":[0.000023898952,0.00019425718,0.011980563,0.0047441707,0.0001594146,0.0005122661,0.0035903773,0.12372789,0.0018156675,0.6496144,0.20349881,0.00013834839],"about_ca_topic_score_codex":0.008693631,"about_ca_topic_score_gemma":0.010212635,"teacher_disagreement_score":0.008693631,"about_ca_system_score_codex":0.0027169746,"about_ca_system_score_gemma":0.0030431598,"threshold_uncertainty_score":0.019713104},"labels":[],"label_agreement":null},{"id":"W3082354722","doi":"10.1016/j.autcon.2020.103368","title":"Rule-based compliance checking and generative design for building interiors using BIM","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Athabasca University","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates - Technology Futures; CRDF Global","keywords":"Building information modeling; Generative Design; Computer science; Process (computing); Building design; Design language; Set (abstract data type); Modeling language; Representation (politics); Software engineering; Engineering design process; Design process; Systems engineering; Human–computer interaction; Engineering; Programming language; Architectural engineering; Software; Work in process","score_opus":0.06662640949856635,"score_gpt":0.2762750582442213,"score_spread":0.20964864874565498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082354722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010102472,0.000026979593,0.98646253,0.00003374666,0.000012503354,0.00006660005,0.00004629028,0.0016955389,0.0015533114],"genre_scores_gemma":[0.35397205,0.000062918116,0.64347136,0.000061985564,0.000008941968,0.00014717043,0.00033934353,0.0005504119,0.0013858518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9944252,0.0018457783,0.00038033217,0.00071059575,0.0022901667,0.00034802628],"domain_scores_gemma":[0.9925476,0.0034847509,0.00044191093,0.0022850328,0.0011263388,0.000114471826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004896069,0.0008941473,0.0013978054,0.0015376236,0.0010768053,0.0033842027,0.0029695553,0.0015591356,0.003785995],"category_scores_gemma":[0.013422723,0.0013113748,0.0026734828,0.0010471187,0.00339673,0.0024962728,0.0037383174,0.0017950167,0.00086483604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000352433,0.0002800856,0.0026948533,0.00030101027,0.00015066059,0.00042466665,0.0009461805,0.66095394,0.0156214,0.12043665,0.0017332605,0.19610482],"study_design_scores_gemma":[0.000028797442,0.000034786368,0.0001794337,0.00003615275,0.000035591645,0.00006059871,0.00005423575,0.95234215,0.008884722,0.036561485,0.0017617925,0.000020216441],"about_ca_topic_score_codex":0.0044385414,"about_ca_topic_score_gemma":0.0062949318,"teacher_disagreement_score":0.004896069,"about_ca_system_score_codex":0.0007923511,"about_ca_system_score_gemma":0.0021461658,"threshold_uncertainty_score":0.025893211},"labels":[],"label_agreement":null},{"id":"W3105746603","doi":"10.1016/j.autcon.2020.103447","title":"An A-Star algorithm for semi-optimization of crane location and configuration in modular construction","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"University of Tehran","keywords":"Lift (data mining); Modular design; Plan (archaeology); Renting; A* search algorithm; Engineering; Computer science; Industrial engineering; Transport engineering; Algorithm; Civil engineering; Data mining","score_opus":0.007463724938484093,"score_gpt":0.20980891541327293,"score_spread":0.20234519047478883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105746603","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055289124,0.000090081805,0.99199027,0.000051453066,0.000040011735,0.00005614111,0.000054386903,0.00049658946,0.0016921771],"genre_scores_gemma":[0.14753038,0.00011719913,0.8481839,0.00012811625,0.00004346827,0.00035484385,0.00030198233,0.00038595818,0.002954157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993001,0.0002739031,0.00004289966,0.00012667174,0.00018860378,0.00006787891],"domain_scores_gemma":[0.9979863,0.0012724577,0.00010019399,0.00014930867,0.00037290718,0.000118882475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019335295,0.001306353,0.0021125618,0.0010230113,0.00088018307,0.0012169367,0.0021294623,0.0020421448,0.005883227],"category_scores_gemma":[0.0034224177,0.0014188915,0.0015414732,0.0013788023,0.0011389528,0.001427931,0.0023179695,0.0017015226,0.0014564943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013375437,0.000097763594,0.00025852266,0.00008420349,0.00004515146,0.00003570072,0.000055131808,0.91006035,0.0010274729,0.0071717896,0.0022076543,0.07882258],"study_design_scores_gemma":[0.000011023578,0.000021446158,0.0000211,0.0000036494523,0.0000022254617,0.0000043486575,0.000004892098,0.99820566,0.00017376435,0.0012869311,0.0002623483,0.0000025826298],"about_ca_topic_score_codex":0.012481292,"about_ca_topic_score_gemma":0.012785029,"teacher_disagreement_score":0.012481292,"about_ca_system_score_codex":0.00083571,"about_ca_system_score_gemma":0.0033002023,"threshold_uncertainty_score":0.024817288},"labels":[],"label_agreement":null},{"id":"W3112944626","doi":"10.1016/j.autcon.2020.103516","title":"Review of image-based analysis and applications in construction","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":112,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Construction engineering; Computer science; Risk analysis (engineering); Visualization; Sustainability; Resilience (materials science); Data science; Sizing; Systems engineering; Engineering; Artificial intelligence; Business","score_opus":0.004901278774654697,"score_gpt":0.22286741545682823,"score_spread":0.21796613668217352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112944626","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010651256,0.97605205,0.017032959,0.0006796842,0.00069998886,0.00003805463,0.00023724519,0.00014780986,0.004047054],"genre_scores_gemma":[0.009378066,0.9650311,0.020672038,0.00076295575,0.0014068158,0.0000433809,0.00038413305,0.00006293125,0.002258668],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99873513,0.00020756568,0.00013946429,0.0002497291,0.0006011401,0.00006704396],"domain_scores_gemma":[0.9962393,0.0020257041,0.00024399959,0.00015146856,0.001239242,0.00010017533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021962246,0.0010790008,0.0014214254,0.0059584277,0.00036720026,0.0025866788,0.0017860748,0.0019366734,0.0054026167],"category_scores_gemma":[0.004644647,0.0006303991,0.0010357255,0.008351382,0.0010511606,0.00223726,0.00095458253,0.0009394613,0.0030614673],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000100772,0.0000677594,0.0007604454,0.01058868,0.000117936936,0.00013231508,0.00008245001,0.0011186781,0.0049732444,0.004839019,0.023554135,0.95366454],"study_design_scores_gemma":[0.000026074984,0.00021589531,0.0060303356,0.006007553,0.00046044838,0.0022445773,0.00027621383,0.0064093093,0.0087524075,0.007868349,0.96153367,0.00017512238],"about_ca_topic_score_codex":0.0037568375,"about_ca_topic_score_gemma":0.0035053934,"teacher_disagreement_score":0.0059584277,"about_ca_system_score_codex":0.0008209098,"about_ca_system_score_gemma":0.0016597023,"threshold_uncertainty_score":0.018073559},"labels":[],"label_agreement":null},{"id":"W3114565053","doi":"10.1016/j.autcon.2020.103521","title":"3D fuzzy ergonomic analysis for rapid workplace design and modification in construction","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":49,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Human factors and ergonomics; Reliability (semiconductor); Fuzzy logic; Human reliability; Risk analysis (engineering); Engineering; Risk assessment; Reliability engineering; Key (lock); Human error; Computer science; Poison control; Artificial intelligence","score_opus":0.11573005437995292,"score_gpt":0.4242366163369597,"score_spread":0.30850656195700676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114565053","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09391514,0.00017764288,0.90285826,0.00006967211,0.000039255166,0.00008439827,0.00021590735,0.00053349184,0.0021061744],"genre_scores_gemma":[0.6853444,0.00016688534,0.31280905,0.00003425236,0.000012504327,0.000121683945,0.00021401748,0.00005157466,0.0012456111],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963105,0.00006482051,0.00002357252,0.00005762688,0.00018322188,0.000039672796],"domain_scores_gemma":[0.9996375,0.00013303677,0.00003747732,0.000039189537,0.00013503066,0.000017788701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004234722,0.00049133017,0.0005336092,0.0012952548,0.000528352,0.0009273889,0.0005475604,0.0006059813,0.0023731184],"category_scores_gemma":[0.00095781486,0.00036917726,0.0009187992,0.000657742,0.00029912798,0.00039335806,0.0005372147,0.00033657314,0.00027305336],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006492887,0.0002741828,0.007096503,0.0004280412,0.00011781309,0.0002685808,0.0008182663,0.38562635,0.08988764,0.008128189,0.002044904,0.50466025],"study_design_scores_gemma":[0.000011612152,0.00008899241,0.0039814883,0.000023943463,0.000027804135,0.00006865176,0.00013898834,0.9848948,0.0077120736,0.0016694609,0.0013518734,0.000030290501],"about_ca_topic_score_codex":0.012823049,"about_ca_topic_score_gemma":0.01275368,"teacher_disagreement_score":0.012823049,"about_ca_system_score_codex":0.0006116267,"about_ca_system_score_gemma":0.00095500005,"threshold_uncertainty_score":0.02549684},"labels":[],"label_agreement":null},{"id":"W3123586607","doi":"10.1016/j.autcon.2021.103561","title":"Automated shape and pose updating of building information model elements from 3D point clouds","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":89,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Point cloud; Computer science; Computer vision; Point (geometry); Artificial intelligence; Computer graphics (images); Information model; Engineering drawing; Engineering; Geometry; Mathematics; Database","score_opus":0.012168144315005508,"score_gpt":0.22861750180973534,"score_spread":0.21644935749472982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123586607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046987474,0.00021916548,0.942888,0.000084027415,0.00007727868,0.00010428677,0.00052833016,0.0075380905,0.0015734743],"genre_scores_gemma":[0.45788434,0.0003960532,0.5348535,0.00008694288,0.00004020924,0.0001156721,0.0031439697,0.00085942296,0.0026197773],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99863017,0.00014177321,0.00006236502,0.0003005693,0.0007430993,0.00012204376],"domain_scores_gemma":[0.9985851,0.0002150457,0.00015577524,0.0005145741,0.00047259167,0.000056885012],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070339034,0.0010621854,0.0013692421,0.0021306137,0.00061362307,0.0018271811,0.001993221,0.0009136199,0.0020456742],"category_scores_gemma":[0.002746799,0.0012133776,0.0012342958,0.0028831216,0.00064267265,0.001614654,0.0026384173,0.001166013,0.002400752],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018660656,0.00015596618,0.00424334,0.0001623593,0.00009539969,0.00015563662,0.00037189867,0.12279345,0.062067784,0.0021453996,0.005044806,0.8025773],"study_design_scores_gemma":[0.000015728536,0.00005219214,0.0057410183,0.000022700904,0.000039657854,0.00014909577,0.00011683524,0.9538919,0.03340405,0.0019084166,0.0046249866,0.000033435797],"about_ca_topic_score_codex":0.01284776,"about_ca_topic_score_gemma":0.019383682,"teacher_disagreement_score":0.01284776,"about_ca_system_score_codex":0.00059772516,"about_ca_system_score_gemma":0.0012961451,"threshold_uncertainty_score":0.025545955},"labels":[],"label_agreement":null},{"id":"W3129503847","doi":"10.1016/j.autcon.2021.103616","title":"Hybrid multi-mode simulation and optimization for subarea scheduling in heavy industrial construction","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Scheduling (production processes); Interdependence; Schedule; Computer science; Industrial engineering; Operations research; Engineering; Operations management","score_opus":0.12738740819452501,"score_gpt":0.39216551898767005,"score_spread":0.26477811079314506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129503847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47802782,0.00035410133,0.50859493,0.0003358356,0.00009826326,0.00012605875,0.00025809003,0.00059953437,0.011605352],"genre_scores_gemma":[0.9788739,0.00006137939,0.019525468,0.00003258038,0.000008882906,0.00007702401,0.000064000305,0.000037124384,0.0013196685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966455,0.00017081645,0.000010531813,0.000041370557,0.000047184607,0.00006560368],"domain_scores_gemma":[0.9986413,0.0010242797,0.00007789227,0.000045012108,0.0001186522,0.000092887254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090013875,0.00062558154,0.0012015611,0.0005272351,0.0006286998,0.00084251905,0.0009964658,0.00097492716,0.0023868596],"category_scores_gemma":[0.0016902632,0.0006509843,0.00085658237,0.00055973866,0.00060287875,0.000606091,0.0007469797,0.0008232959,0.00016040106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023122846,0.000014723056,0.00014122849,0.000004658094,0.000005144964,0.0000052261,0.00000610725,0.9985429,0.00013345384,0.00026009607,0.000029229042,0.00083401176],"study_design_scores_gemma":[0.0000021828712,0.000004173732,0.000023730678,3.4687608e-7,7.6461015e-7,3.5782222e-7,0.0000016644843,0.99983776,0.00003483822,0.00007997655,0.000013482844,6.727805e-7],"about_ca_topic_score_codex":0.039503366,"about_ca_topic_score_gemma":0.021795943,"teacher_disagreement_score":0.039503366,"about_ca_system_score_codex":0.0011988728,"about_ca_system_score_gemma":0.0017550429,"threshold_uncertainty_score":0.07854688},"labels":[],"label_agreement":null},{"id":"W3132686745","doi":"10.1016/j.autcon.2021.103578","title":"Expertise-based bid evaluation for construction-contractor selection with generalized comparative linguistic ELECTRE III","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":152,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"ELECTRE; Selection (genetic algorithm); Process (computing); Fuzzy logic; Operations research; Computer science; Management science; Artificial intelligence; Mathematics; Multiple-criteria decision analysis; Engineering","score_opus":0.17190523792390283,"score_gpt":0.4475848583406495,"score_spread":0.27567962041674665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132686745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1390201,0.00036063226,0.8518057,0.0003019455,0.000055170363,0.00029559774,0.00015384245,0.00034939745,0.007657595],"genre_scores_gemma":[0.9075651,0.00007091146,0.090254895,0.000049142265,0.00003181344,0.00015435401,0.0001938324,0.000029026027,0.0016509068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9957294,0.0023324802,0.00020365712,0.00044981408,0.00094912125,0.00033543934],"domain_scores_gemma":[0.992845,0.0049699536,0.00023141356,0.0003012077,0.001421144,0.00023137494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006871398,0.0008374645,0.0018667236,0.0045340518,0.0010128331,0.0019666539,0.0014409464,0.0012572076,0.0041927663],"category_scores_gemma":[0.017118597,0.00039023094,0.00095781713,0.0022422352,0.0009123316,0.0019417271,0.0019180183,0.00069142325,0.00031176192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012754496,0.0005341707,0.008619612,0.0004442462,0.00036942257,0.0004435261,0.0005868033,0.6101077,0.004104276,0.03628388,0.0043750047,0.33285597],"study_design_scores_gemma":[0.000021287653,0.00006394228,0.00090064225,0.00001279092,0.000027492735,0.000031682932,0.00006130472,0.992964,0.00039925927,0.0052373395,0.0002655219,0.000014671241],"about_ca_topic_score_codex":0.0063454662,"about_ca_topic_score_gemma":0.0044540702,"teacher_disagreement_score":0.006871398,"about_ca_system_score_codex":0.0016144671,"about_ca_system_score_gemma":0.001701738,"threshold_uncertainty_score":0.03633988},"labels":[],"label_agreement":null},{"id":"W3147942149","doi":"10.1016/j.autcon.2021.103686","title":"Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Building information modeling; Computer science; Automation; Ground truth; Data mining; Information model; Systems engineering; Artificial intelligence; Engineering; Software engineering","score_opus":0.07003548266244033,"score_gpt":0.25856874744954156,"score_spread":0.18853326478710122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3147942149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8692152,0.00051514094,0.11932659,0.00021307543,0.00005656786,0.00022234615,0.0023699421,0.0010291737,0.007051961],"genre_scores_gemma":[0.96666974,0.00013320208,0.03162833,0.00001525016,0.0000067165015,0.00005648986,0.0011035954,0.00010237483,0.00028438104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9893967,0.003303776,0.00091791904,0.0015030007,0.0043248627,0.0005537611],"domain_scores_gemma":[0.9431935,0.031396616,0.005022019,0.012067423,0.008087315,0.0002331818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015462087,0.0009607583,0.0006905714,0.0030649637,0.0006635177,0.0026481925,0.0013640858,0.0013073132,0.0012951426],"category_scores_gemma":[0.053579222,0.0005671565,0.000806147,0.0043823053,0.0015935358,0.0026498556,0.0015498128,0.00076991966,0.00042539285],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008645877,0.0002919037,0.07813467,0.00057230925,0.00026566026,0.00025038645,0.0011765925,0.80703783,0.01607974,0.004761019,0.0007984349,0.089766815],"study_design_scores_gemma":[0.000054040822,0.0006508328,0.11119823,0.00020063901,0.00015109639,0.00072685664,0.001728323,0.82548577,0.049683776,0.0041931993,0.005691021,0.00023613902],"about_ca_topic_score_codex":0.005314289,"about_ca_topic_score_gemma":0.006460135,"teacher_disagreement_score":0.015462087,"about_ca_system_score_codex":0.001421177,"about_ca_system_score_gemma":0.0007265343,"threshold_uncertainty_score":0.08177233},"labels":[],"label_agreement":null},{"id":"W3153916170","doi":"10.1016/j.autcon.2021.103700","title":"A computational methodology for generating modular design options for building extensions","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Modular design; Computer science; Efficient energy use; Demolition; Architectural engineering; Systems engineering; Building design; Pareto principle; Axiomatic design; Risk analysis (engineering); Engineering; Civil engineering; Manufacturing engineering; Operations management","score_opus":0.06617196106758301,"score_gpt":0.30674792226728026,"score_spread":0.24057596119969726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153916170","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004043954,0.000025543126,0.9928953,0.00003753175,0.000012178454,0.000041480598,0.00006496208,0.00016470512,0.0027143455],"genre_scores_gemma":[0.13479425,0.000070693015,0.8621801,0.000043197993,0.000018749264,0.00020614015,0.00026197644,0.00014715968,0.0022776872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956053,0.00010720025,0.000024753455,0.00007440978,0.00019331613,0.000039745206],"domain_scores_gemma":[0.99906296,0.000581325,0.000052681058,0.00014660547,0.00012631217,0.00003015437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010760459,0.0007857105,0.0008797592,0.0013411894,0.00083743467,0.0014629861,0.0019315014,0.0011282541,0.008367712],"category_scores_gemma":[0.0032855896,0.000674971,0.0018199724,0.0010977497,0.001312602,0.0013109354,0.0019907353,0.0013679842,0.00095847575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039974053,0.000099523466,0.0004908284,0.00018440293,0.000042923377,0.00017075248,0.00014566147,0.63007855,0.0032728778,0.26791924,0.0019052478,0.09565011],"study_design_scores_gemma":[0.000012144407,0.000014450532,0.000057270103,0.000021487249,0.000012501635,0.000032256703,0.000022654902,0.91563654,0.0008462859,0.08073331,0.0026036422,0.000007412726],"about_ca_topic_score_codex":0.002026446,"about_ca_topic_score_gemma":0.005100266,"teacher_disagreement_score":0.008367712,"about_ca_system_score_codex":0.0006357245,"about_ca_system_score_gemma":0.000981191,"threshold_uncertainty_score":0.027992785},"labels":[],"label_agreement":null},{"id":"W3156766589","doi":"10.1016/j.autcon.2021.103721","title":"A vision-based method for automatic tracking of construction machines at nighttime based on deep learning illumination enhancement","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":69,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China; University of Alberta","keywords":"Robustness (evolution); Computer science; Artificial intelligence; Tracking (education); Kalman filter; Computer vision; sort; Data association; Eye tracking; Machine learning; Filter (signal processing)","score_opus":0.012542515074357224,"score_gpt":0.26689632956317394,"score_spread":0.2543538144888167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156766589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03098283,0.00042539925,0.9621679,0.00009084756,0.00012419675,0.000048938437,0.00022291717,0.0028968833,0.0030401277],"genre_scores_gemma":[0.39540702,0.0005516129,0.5885014,0.00022129569,0.000102107784,0.00008983531,0.0013518165,0.00034412314,0.013430817],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99969995,0.000019509724,0.000009124232,0.00010501351,0.00009674427,0.000069591166],"domain_scores_gemma":[0.99981314,0.00001910019,0.000021054817,0.000035822217,0.000092289265,0.00001865752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002702982,0.00064914644,0.0007295625,0.0010191954,0.00033197703,0.0005666283,0.0011260804,0.00061392435,0.0018997026],"category_scores_gemma":[0.00035669983,0.0004417938,0.000688633,0.0010390313,0.0002422393,0.0005715728,0.0009280073,0.00086265296,0.0013191748],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017569982,0.00019503194,0.0028330784,0.00008420464,0.000073129166,0.00006937922,0.000053598505,0.023414765,0.07316969,0.0011795068,0.006456065,0.89229584],"study_design_scores_gemma":[0.000016496919,0.00007267247,0.0064389156,0.000016076807,0.00004654601,0.00016439839,0.000023008568,0.9450218,0.040827688,0.0012101175,0.0061351242,0.000027205773],"about_ca_topic_score_codex":0.006510099,"about_ca_topic_score_gemma":0.014171448,"teacher_disagreement_score":0.006510099,"about_ca_system_score_codex":0.00044833738,"about_ca_system_score_gemma":0.0008643895,"threshold_uncertainty_score":0.01294446},"labels":[],"label_agreement":null},{"id":"W3175519829","doi":"10.1016/j.autcon.2021.103817","title":"Vision-based method of automatically detecting construction video highlights by integrating machine tracking and CNN feature extraction","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Taiwan University of Science and Technology; National Taiwan University","keywords":"Artificial intelligence; Feature extraction; Computer science; Tracking (education); Computer vision; Feature (linguistics); Machine vision; Video tracking; Pattern recognition (psychology); Video processing","score_opus":0.009430226844849518,"score_gpt":0.26230692742224687,"score_spread":0.25287670057739736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3175519829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07906422,0.000697009,0.9105936,0.00011905214,0.00017579838,0.00015122457,0.0005362458,0.0034149797,0.0052479175],"genre_scores_gemma":[0.51569045,0.0009232465,0.4688889,0.00018105602,0.00012477773,0.00015438898,0.0018325185,0.00017800285,0.012026646],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99968326,0.000014179331,0.000012068552,0.000104374754,0.00012969521,0.000056548874],"domain_scores_gemma":[0.99977785,0.000021105821,0.000029470906,0.000029877961,0.00012499164,0.000016712056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027118437,0.00080162747,0.0006298729,0.0017625551,0.00029044843,0.0005910472,0.0009446268,0.000562344,0.0014042445],"category_scores_gemma":[0.00038099085,0.0003690958,0.0005148565,0.001217099,0.00018115467,0.0005922311,0.00053830154,0.00046087755,0.001021456],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016485284,0.00015702938,0.0046013114,0.00011581492,0.000076657256,0.00011775839,0.00003666946,0.01073954,0.19655985,0.0009645194,0.0047873426,0.7816786],"study_design_scores_gemma":[0.000020558453,0.0001423549,0.017551808,0.000025951793,0.000111448186,0.00040732595,0.000041950123,0.8217206,0.15102464,0.00095533323,0.007962068,0.000035983514],"about_ca_topic_score_codex":0.008592241,"about_ca_topic_score_gemma":0.014243768,"teacher_disagreement_score":0.008592241,"about_ca_system_score_codex":0.00051296176,"about_ca_system_score_gemma":0.00096341287,"threshold_uncertainty_score":0.01708448},"labels":[],"label_agreement":null},{"id":"W3198907744","doi":"10.1016/j.autcon.2021.103928","title":"Providing proximity alerts to workers on construction sites using Bluetooth Low Energy RTLS","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Elevator Systems and Control","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Mitacs","keywords":"Real-time locating system; Bluetooth; Personal protective equipment; Transport engineering; Engineering; Computer science; Risk analysis (engineering); Computer security; Wireless; Real-time computing; Telecommunications; Business","score_opus":0.010239999068576505,"score_gpt":0.2139250961344748,"score_spread":0.2036850970658983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3198907744","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53022265,0.001364333,0.3882782,0.0011012991,0.00050708646,0.00042915583,0.0008610068,0.019244434,0.057991717],"genre_scores_gemma":[0.9674086,0.00018470437,0.015274172,0.0003760104,0.00007694918,0.000090976726,0.00015551888,0.00010190329,0.016331153],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994972,0.00011358927,0.00002448378,0.00006218619,0.00023458575,0.00006794858],"domain_scores_gemma":[0.99909973,0.00032330657,0.00016042212,0.0001298224,0.00022984626,0.000056911125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026994487,0.0004668276,0.00026554987,0.0007172177,0.0003243372,0.0006413412,0.00049732963,0.00059776794,0.007288984],"category_scores_gemma":[0.0014312848,0.00022731889,0.00015394107,0.00029947498,0.00013728734,0.00045042374,0.0008577887,0.00030639142,0.0030072525],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017598385,0.00048874825,0.032745056,0.00069680705,0.0001225487,0.0010344402,0.0014158834,0.0053299353,0.26496273,0.0012274358,0.019187499,0.671029],"study_design_scores_gemma":[0.0008309669,0.007392863,0.18121354,0.00087539386,0.00084926275,0.009156901,0.00409744,0.21996096,0.3882606,0.005524914,0.18145625,0.00038085022],"about_ca_topic_score_codex":0.00066985877,"about_ca_topic_score_gemma":0.0013948213,"teacher_disagreement_score":0.007288984,"about_ca_system_score_codex":0.00013789741,"about_ca_system_score_gemma":0.00020072646,"threshold_uncertainty_score":0.024384081},"labels":[],"label_agreement":null},{"id":"W3205823175","doi":"10.1016/j.autcon.2021.104002","title":"Streamlined project time-cost tradeoff optimization methodology: Algorithm, automation, and application","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Automation; Computer science; Industrial engineering; Engineering; Optimization algorithm; Algorithm; Mathematical optimization; Systems engineering; Mathematics; Mechanical engineering","score_opus":0.08429030014314813,"score_gpt":0.38763001149765036,"score_spread":0.3033397113545022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205823175","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008900023,0.00009347762,0.98969346,0.00006141781,0.000013632605,0.000058344864,0.000050400515,0.00030910742,0.00082017627],"genre_scores_gemma":[0.20636626,0.00020418361,0.7911109,0.000066106455,0.000031174644,0.00034214987,0.00017372887,0.00010912082,0.0015964302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926263,0.000292133,0.0000383417,0.0001014447,0.0002506823,0.000054789747],"domain_scores_gemma":[0.9982204,0.0009721665,0.0001951779,0.00013099927,0.0004311026,0.000050168106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018706162,0.0008407852,0.0012536956,0.0010632565,0.00042878193,0.00097155484,0.0010451066,0.00079161866,0.0035727066],"category_scores_gemma":[0.0034063903,0.00056438014,0.00068147073,0.0015616079,0.0004158946,0.001005479,0.0008699926,0.0009958219,0.000558108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066204295,0.00007789279,0.0006693494,0.00009505311,0.000027241225,0.000027559418,0.00004117262,0.8629516,0.0017630181,0.0060946587,0.00095538277,0.12723094],"study_design_scores_gemma":[0.000012623629,0.000030690153,0.00007230061,0.000004870069,0.00000519186,0.0000073894594,0.0000029262903,0.99709034,0.00044442766,0.0020012294,0.0003257596,0.0000022646996],"about_ca_topic_score_codex":0.00485943,"about_ca_topic_score_gemma":0.00444982,"teacher_disagreement_score":0.00485943,"about_ca_system_score_codex":0.0011496651,"about_ca_system_score_gemma":0.002336595,"threshold_uncertainty_score":0.011951864},"labels":[],"label_agreement":null},{"id":"W4200288350","doi":"10.1016/j.autcon.2021.104082","title":"Ortho-photogrammetry for prefabricated energy-efficiency retrofits","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University; University of Alberta","funders":"","keywords":"Photogrammetry; Tripod (photography); Laser scanning; Process (computing); Computer science; Engineering drawing; Engineering; Computer graphics (images); Computer vision; Laser; Mechanical engineering; Optics","score_opus":0.017769714178056707,"score_gpt":0.22791555757322088,"score_spread":0.21014584339516418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200288350","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0824837,0.0006679482,0.8900594,0.00015276638,0.00016524507,0.00010908094,0.00093762897,0.0031103904,0.022313837],"genre_scores_gemma":[0.6376807,0.00073387945,0.3489013,0.000072402916,0.000047475613,0.00009914177,0.0011828055,0.0006815503,0.01060077],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920195,0.0001422014,0.00002775498,0.000116954965,0.00045876612,0.000052451305],"domain_scores_gemma":[0.9994097,0.000115202805,0.000056027904,0.00020822867,0.0001959847,0.000014874572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043937023,0.0008140931,0.00046241662,0.0014200244,0.0004589116,0.00091849593,0.0005418223,0.00046170925,0.0075729],"category_scores_gemma":[0.00097428745,0.00038688723,0.00039939486,0.0020261728,0.0004311064,0.0007618237,0.0007037105,0.0005907473,0.0027033917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022681736,0.00010370729,0.0045069926,0.00029209713,0.00002444039,0.00014502335,0.0003901816,0.03243426,0.11371473,0.0065201786,0.0045105466,0.837131],"study_design_scores_gemma":[0.0000768922,0.0006543414,0.07552563,0.00029859997,0.00011126864,0.0023374478,0.0014689857,0.4012328,0.35837424,0.017022694,0.14266853,0.00022858959],"about_ca_topic_score_codex":0.0014969064,"about_ca_topic_score_gemma":0.0030301893,"teacher_disagreement_score":0.0075729,"about_ca_system_score_codex":0.00025570637,"about_ca_system_score_gemma":0.00059429894,"threshold_uncertainty_score":0.025333822},"labels":[],"label_agreement":null},{"id":"W4206160617","doi":"10.1016/j.autcon.2021.104112","title":"Tag-based visual-inertial localization of unmanned aerial vehicles in indoor construction environments using an on-manifold extended Kalman filter","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":60,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Inertial measurement unit; Extended Kalman filter; Artificial intelligence; Computer vision; Simultaneous localization and mapping; Global Positioning System; Computer science; Kalman filter; Inertial navigation system; Inertial frame of reference; Robot; Mobile robot","score_opus":0.019102395287431188,"score_gpt":0.24058225355481302,"score_spread":0.22147985826738184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206160617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09152116,0.00018309926,0.9059622,0.000056007462,0.0000823931,0.000016909957,0.00006971085,0.0007605186,0.0013480366],"genre_scores_gemma":[0.9106819,0.00014308859,0.08609783,0.000037324575,0.000031009866,0.00003138899,0.00022798995,0.00004175222,0.002707658],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977046,0.000026980015,0.000009523034,0.00007475789,0.00008519294,0.000033044817],"domain_scores_gemma":[0.9998042,0.00003091948,0.000035936828,0.000036168363,0.000079010635,0.000013691118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019070749,0.00042510804,0.0005542575,0.00039548884,0.0003193905,0.00046947834,0.00055922114,0.00043330155,0.00068916345],"category_scores_gemma":[0.0006493565,0.00023651637,0.0003990476,0.00066083786,0.0002820096,0.0007763843,0.0008003249,0.00036082973,0.0004862501],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036787646,0.0001559455,0.012129029,0.0001810197,0.00019745722,0.0001893896,0.00047275462,0.35599437,0.0672989,0.0045317425,0.0035943482,0.5548872],"study_design_scores_gemma":[0.000011999746,0.00007917838,0.0042009545,0.0000068026734,0.000027234293,0.000049617513,0.000048762995,0.9869034,0.006254716,0.0009772988,0.0014240637,0.000015928159],"about_ca_topic_score_codex":0.008349222,"about_ca_topic_score_gemma":0.012265427,"teacher_disagreement_score":0.008349222,"about_ca_system_score_codex":0.00023776627,"about_ca_system_score_gemma":0.0006280725,"threshold_uncertainty_score":0.016601205},"labels":[],"label_agreement":null},{"id":"W4220701267","doi":"10.1016/j.autcon.2022.104189","title":"Prediction of human restorative experience for human-centered residential architecture design: A non-immersive VR–DOE-based machine learning method","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Urban Green Space and Health","field":"Environmental Science","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Alberta Innovates; National Natural Science Foundation of China; University of Alberta","keywords":"Computer science; Human–computer interaction; Architecture; Architectural design; Engineering; Artificial intelligence","score_opus":0.047041555418994734,"score_gpt":0.31837291782094235,"score_spread":0.2713313624019476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220701267","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42603374,0.00020542236,0.5698616,0.000091550886,0.000036633435,0.000059164737,0.00033478535,0.00096184766,0.0024153262],"genre_scores_gemma":[0.9329079,0.00007121405,0.065645486,0.000031698535,0.000008902906,0.000051900122,0.0002792869,0.000032369822,0.0009713086],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998431,0.000040491264,0.0000062724175,0.00005017381,0.000037414386,0.000022418859],"domain_scores_gemma":[0.99950075,0.0003194783,0.000036780584,0.0000394732,0.00008247378,0.000021045047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003442867,0.0006110097,0.00041377812,0.0006076249,0.00015458978,0.00046699605,0.0005677265,0.0007334743,0.001760391],"category_scores_gemma":[0.0011180711,0.00025299928,0.00070064433,0.00040107267,0.00021117138,0.0004898672,0.00039121238,0.00046563562,0.00030764187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002754865,0.0005876443,0.013428447,0.00014492028,0.00009813711,0.00010881233,0.00017690592,0.75650734,0.022132648,0.0006973636,0.0009241809,0.20491806],"study_design_scores_gemma":[0.000003396129,0.000050301915,0.0018412605,0.0000033356073,0.000006596269,0.000016147129,0.000022336608,0.9964038,0.0013669229,0.00016528083,0.000114594506,0.000006100924],"about_ca_topic_score_codex":0.00463074,"about_ca_topic_score_gemma":0.006835754,"teacher_disagreement_score":0.00463074,"about_ca_system_score_codex":0.000249354,"about_ca_system_score_gemma":0.00031671577,"threshold_uncertainty_score":0.009207606},"labels":[],"label_agreement":null},{"id":"W4220763328","doi":"10.1016/j.autcon.2022.104211","title":"Back-stepping control of delta parallel robots with smart dynamic model selection for construction applications","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Controller (irrigation); Robot; Control theory (sociology); Selection (genetic algorithm); Reinforcement learning; Control engineering; Computer science; Online model; Identification (biology); System identification; Engineering; Simulation; Control (management); Artificial intelligence; Data modeling","score_opus":0.007142740562000273,"score_gpt":0.21788890215542944,"score_spread":0.21074616159342918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220763328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.103451304,0.00019074435,0.88624644,0.000104969295,0.000078918325,0.00005388772,0.000048078706,0.00077237247,0.009053222],"genre_scores_gemma":[0.97051954,0.000063898304,0.026533872,0.000022431033,0.000007516143,0.000057502577,0.000039684666,0.000020953214,0.0027346928],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99989116,0.00001849838,0.0000059870968,0.00002900888,0.000038669557,0.000016743528],"domain_scores_gemma":[0.99984884,0.000031964308,0.000030902407,0.000029591345,0.000045320783,0.000013372532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024664286,0.00054447347,0.0005040219,0.00023963774,0.00035405086,0.0004167626,0.00060810405,0.00032109016,0.001976375],"category_scores_gemma":[0.0003402697,0.00029293293,0.0002770947,0.00023611035,0.00039323114,0.00033595925,0.0006358384,0.00038913486,0.00040078835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004824469,0.00012366367,0.0010732714,0.00020020806,0.000056067413,0.00022571538,0.00016379761,0.780566,0.055718374,0.010820142,0.0019061283,0.14866425],"study_design_scores_gemma":[0.000015950567,0.00009037388,0.00032444106,0.000005495352,0.0000067828,0.000029164046,0.000011132647,0.99296075,0.0041546286,0.001453357,0.00094122277,0.00000674325],"about_ca_topic_score_codex":0.0020153967,"about_ca_topic_score_gemma":0.0026701235,"teacher_disagreement_score":0.0020153967,"about_ca_system_score_codex":0.00022012752,"about_ca_system_score_gemma":0.00042945342,"threshold_uncertainty_score":0.006611645},"labels":[],"label_agreement":null},{"id":"W4220891812","doi":"10.1016/j.autcon.2022.104201","title":"Integrating off-site and on-site panelized construction schedules using fleet dispatching","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea","keywords":"Schedule; Factory (object-oriented programming); Truck; Bridge (graph theory); Discrete event simulation; Engineering; Transport engineering; Operations research; Fleet management; Computer science; Operations management; Simulation; Automotive engineering","score_opus":0.010102974649408082,"score_gpt":0.2246264265965721,"score_spread":0.21452345194716402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220891812","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16042401,0.00007965227,0.80116624,0.00010184989,0.0002041032,0.00024450655,0.0006671534,0.006196434,0.030916061],"genre_scores_gemma":[0.7512515,0.00009224754,0.23648748,0.000026270896,0.000025770387,0.00008880823,0.0011743426,0.000992891,0.009860634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990766,0.00021632553,0.000040507013,0.00015191383,0.00039307182,0.00012164227],"domain_scores_gemma":[0.9987992,0.00026945927,0.000111032765,0.00035068468,0.0003553704,0.00011419246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011575641,0.00088492705,0.0007873598,0.0014002796,0.0004711539,0.0016402754,0.0010203535,0.00039960374,0.010298274],"category_scores_gemma":[0.0025402918,0.000553731,0.00058412243,0.0012499004,0.00026872024,0.0013196901,0.0011569081,0.00077156635,0.002382899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050906744,0.00043282597,0.005786341,0.00012685178,0.000084911226,0.00016695929,0.0004822013,0.5432309,0.029408623,0.0065177158,0.004885405,0.40836823],"study_design_scores_gemma":[0.00004450326,0.0002676582,0.009040124,0.000046810077,0.00006101844,0.00010244621,0.00039772745,0.9476047,0.020598926,0.0054112887,0.016324993,0.00009977896],"about_ca_topic_score_codex":0.009488925,"about_ca_topic_score_gemma":0.013180464,"teacher_disagreement_score":0.010298274,"about_ca_system_score_codex":0.0007657475,"about_ca_system_score_gemma":0.0016146655,"threshold_uncertainty_score":0.034451187},"labels":[],"label_agreement":null},{"id":"W4281676600","doi":"10.1016/j.autcon.2022.104349","title":"Kinetic rigid cover for spherical scissor-like mechanism","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Advanced Materials and Mechanics","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Parametric statistics; Mechanism (biology); Kinetic energy; Cover (algebra); Point (geometry); Computer science; Rigid body; Motion (physics); Trajectory; Structural engineering; Geometry; Engineering; Mechanical engineering; Mathematics; Physics; Classical mechanics; Artificial intelligence","score_opus":0.0073582599808763565,"score_gpt":0.21464112127457013,"score_spread":0.20728286129369378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281676600","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5727288,0.0005678559,0.3686302,0.00026400248,0.00021822724,0.00007010864,0.00023889291,0.0005334474,0.056748413],"genre_scores_gemma":[0.97627676,0.00019319974,0.011007539,0.000024304572,0.00003811628,0.00003814228,0.00013455833,0.000044562104,0.012242782],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998654,0.000011361957,0.0000048973916,0.00002486655,0.000062157385,0.00003134048],"domain_scores_gemma":[0.9999348,0.000008101451,0.000014045256,0.000019379477,0.000009215831,0.000014480022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009872299,0.00040272492,0.00037444296,0.00045434298,0.00056523853,0.00042710814,0.00042312153,0.00052870385,0.0041777664],"category_scores_gemma":[0.00016603894,0.00013120458,0.0005610679,0.00018812629,0.00046112426,0.0005254538,0.00073948945,0.00031424468,0.00062051485],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000401573,0.000115014846,0.0011706708,0.00026719907,0.00005765495,0.001039421,0.00019610825,0.09843152,0.31204796,0.52921045,0.002488925,0.05457352],"study_design_scores_gemma":[0.00008209617,0.0010460237,0.006076378,0.000047888465,0.00005209147,0.002144191,0.0001713971,0.76468664,0.09130808,0.11635085,0.017933074,0.00010128681],"about_ca_topic_score_codex":0.00036358976,"about_ca_topic_score_gemma":0.00023376665,"teacher_disagreement_score":0.0041777664,"about_ca_system_score_codex":0.00021211195,"about_ca_system_score_gemma":0.000198761,"threshold_uncertainty_score":0.0139760375},"labels":[],"label_agreement":null},{"id":"W4282968354","doi":"10.1016/j.autcon.2022.104394","title":"Tolerance management domain model for semantic enrichment of BIMs","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Danmarks Frie Forskningsfond; Teknologi og Produktion, Det Frie Forskningsråd","keywords":"Computer science; Domain (mathematical analysis); Domain model; Natural language processing; Software engineering; Mathematics; Domain knowledge","score_opus":0.007508623054453583,"score_gpt":0.21126244725183455,"score_spread":0.20375382419738097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4282968354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009161024,0.00016945924,0.9750308,0.00026226894,0.000056584566,0.0001279282,0.0008400593,0.0022022468,0.012149644],"genre_scores_gemma":[0.2573234,0.00053812703,0.7237712,0.0003011221,0.000056321078,0.00036593035,0.005474929,0.000534901,0.011634108],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986136,0.00030241132,0.0001690592,0.00022202056,0.000536741,0.00015618655],"domain_scores_gemma":[0.99914646,0.0001581872,0.00007402992,0.00028895104,0.00028675215,0.00004554844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001319499,0.0006585694,0.0005480706,0.0024204405,0.0007627586,0.002581755,0.0014583861,0.00096252386,0.003509295],"category_scores_gemma":[0.0022859776,0.00038365205,0.0015058331,0.002544799,0.0006588315,0.0030630105,0.0025787826,0.0013390381,0.0014484375],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020976986,0.00028304665,0.0022692208,0.00043414533,0.00011573262,0.0007749693,0.0009182236,0.12288386,0.010319771,0.683943,0.01462804,0.16322023],"study_design_scores_gemma":[0.000035043406,0.000053075793,0.000773982,0.00018775182,0.00015937543,0.00047979626,0.00037887687,0.6294114,0.014275311,0.22327192,0.13091907,0.00005434399],"about_ca_topic_score_codex":0.004862385,"about_ca_topic_score_gemma":0.007980962,"teacher_disagreement_score":0.004862385,"about_ca_system_score_codex":0.0009158354,"about_ca_system_score_gemma":0.0015688332,"threshold_uncertainty_score":0.011739731},"labels":[],"label_agreement":null},{"id":"W4283066848","doi":"10.1016/j.autcon.2022.104405","title":"Structural rigidity theory applied to the scaffold-free (dis)assembly of space frames using cooperative robotics","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Modular Robots and Swarm Intelligence","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Princeton University; National Science Foundation","keywords":"Rigidity (electromagnetism); Planarity testing; Truss; Tetrahedron; Structural rigidity; Computer science; Robotics; Graph; Topology (electrical circuits); Robot; Space frame; Graph theory; Algorithm; Artificial intelligence; Theoretical computer science; Engineering; Structural engineering; Mathematics; Geometry; Combinatorics","score_opus":0.01621796764103209,"score_gpt":0.23907891282130828,"score_spread":0.2228609451802762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283066848","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024737418,0.00027203583,0.9599001,0.0001701558,0.00007339649,0.000016918084,0.000016305627,0.000073453215,0.014740309],"genre_scores_gemma":[0.84577495,0.0006970074,0.1393953,0.00011444729,0.00013052653,0.000114214825,0.00006648434,0.00009838425,0.013608624],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997209,0.00007893966,0.000010639896,0.00004436267,0.0001135718,0.0000315929],"domain_scores_gemma":[0.9996544,0.00013222305,0.000062231986,0.00005960993,0.00006137243,0.00003023138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003683606,0.00054272346,0.00047127294,0.0010185908,0.00065758376,0.00077266415,0.0008635778,0.0008184735,0.0019423288],"category_scores_gemma":[0.0008827497,0.00031951722,0.0007337725,0.00049892615,0.0015759043,0.0010924699,0.0010228124,0.0008358824,0.00042280322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001758978,0.000021228012,0.00019613755,0.000050928207,0.000014488954,0.000099814686,0.00016044364,0.14215487,0.0079368735,0.8329712,0.0006074349,0.015768992],"study_design_scores_gemma":[0.0000065973486,0.00007211559,0.00039509943,0.000017136912,0.000010420652,0.000090717745,0.00005721289,0.73717856,0.0019984122,0.25646666,0.0036873266,0.000019671696],"about_ca_topic_score_codex":0.0012723652,"about_ca_topic_score_gemma":0.0012572124,"teacher_disagreement_score":0.0019423288,"about_ca_system_score_codex":0.0006781081,"about_ca_system_score_gemma":0.00050408626,"threshold_uncertainty_score":0.0064977407},"labels":[],"label_agreement":null},{"id":"W4283260199","doi":"10.1016/j.autcon.2022.104441","title":"Learning-driven construction productivity prediction for prefabricated external insulation wall system","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Institute for Advancement of Technology; Ministry of Trade, Industry and Energy","keywords":"Productivity; Engineering; Learning effect; Construction industry; Economic shortage; Industrial engineering; Computer science; Machine learning; Artificial intelligence; Construction engineering","score_opus":0.007856629503674932,"score_gpt":0.19978835231756842,"score_spread":0.19193172281389348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283260199","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8886032,0.00021684132,0.10723382,0.00010989141,0.00003929877,0.00003879325,0.0006590687,0.0009003573,0.0021987965],"genre_scores_gemma":[0.9952271,0.000025351686,0.003681922,0.000008002667,0.000004119585,0.000013683228,0.00043142855,0.00001243657,0.0005958741],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978155,0.000025243065,0.000009207092,0.00006570986,0.00005736002,0.000061007675],"domain_scores_gemma":[0.9993268,0.00029914296,0.00007883055,0.000045019817,0.00020476067,0.00004539966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041042618,0.0006940862,0.00048526845,0.0006937016,0.00021533528,0.0004718825,0.0005291593,0.0005444187,0.001649428],"category_scores_gemma":[0.0013680377,0.00021871035,0.0004821587,0.00045968915,0.00018190137,0.0004043986,0.0003660446,0.0005046899,0.00045144552],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025935276,0.00018466226,0.010963966,0.00005384962,0.000026476999,0.00009103947,0.000019824682,0.942536,0.0030463114,0.00024963627,0.00071023667,0.041858587],"study_design_scores_gemma":[0.0000023005814,0.000018999719,0.0017421975,0.0000011877621,0.0000028887778,0.000004693338,0.000003524997,0.9974463,0.0006752454,0.000066997425,0.000033647513,0.0000019856855],"about_ca_topic_score_codex":0.013174541,"about_ca_topic_score_gemma":0.009079741,"teacher_disagreement_score":0.013174541,"about_ca_system_score_codex":0.0005611315,"about_ca_system_score_gemma":0.00048471274,"threshold_uncertainty_score":0.026195705},"labels":[],"label_agreement":null},{"id":"W4298326007","doi":"10.1016/j.autcon.2022.104596","title":"Spatial conflict simulator using game engine technology and Bayesian networks for workspace management","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Università Politecnica delle Marche; York University; New York University Abu Dhabi","keywords":"Workspace; Computer science; Simulation; Game engine; Bayesian network; Human–computer interaction; Artificial intelligence; Robot","score_opus":0.0065374399666457954,"score_gpt":0.21549301307792249,"score_spread":0.2089555731112767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298326007","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.109009385,0.0000406666,0.8793962,0.00018172692,0.0000775113,0.00027383113,0.0004031665,0.0016515699,0.008965931],"genre_scores_gemma":[0.7747238,0.000049983104,0.22077335,0.00006168571,0.000010118934,0.00047624332,0.0003120922,0.0001569313,0.003435805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999443,0.0002587452,0.000033808312,0.00007919139,0.00013398149,0.000051174928],"domain_scores_gemma":[0.9974721,0.001874727,0.00010021669,0.00015493411,0.00026184693,0.00013613088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013413887,0.0006825377,0.0006801478,0.00074716663,0.0005107864,0.0010644367,0.0018989262,0.0011569847,0.0073460806],"category_scores_gemma":[0.0053209984,0.00056758075,0.00059697736,0.0005524418,0.00054519065,0.0013567124,0.0015962138,0.0011790751,0.0004730445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019140476,0.00021366942,0.0011759228,0.00003665664,0.000045118202,0.00004958404,0.00011407858,0.9704716,0.0010235525,0.012861251,0.00058067,0.013236542],"study_design_scores_gemma":[0.000015792704,0.00001447318,0.000059020706,0.0000018950692,0.0000041285434,0.0000035715364,0.000008330039,0.9978709,0.00022864678,0.0016136956,0.0001761065,0.000003452206],"about_ca_topic_score_codex":0.017657775,"about_ca_topic_score_gemma":0.015439615,"teacher_disagreement_score":0.017657775,"about_ca_system_score_codex":0.0010791766,"about_ca_system_score_gemma":0.0017957413,"threshold_uncertainty_score":0.035109997},"labels":[],"label_agreement":null},{"id":"W4309781265","doi":"10.1016/j.autcon.2022.104631","title":"Systematic search and mapping review of the concrete delivery problem (CDP): Formulations, objectives, and data","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Mitacs","keywords":"Computer science; Engineering; Information retrieval; Construction engineering; Data mining","score_opus":0.01617566056795186,"score_gpt":0.2368264143361466,"score_spread":0.22065075376819474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309781265","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007187627,0.9731039,0.004841034,0.0014694149,0.00023641584,0.005262011,0.006103845,0.00006896266,0.0017267076],"genre_scores_gemma":[0.10082706,0.85769767,0.020794649,0.002223448,0.00014624305,0.012796803,0.004725881,0.00006195717,0.00072631415],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9478235,0.02130226,0.020767998,0.0031901405,0.006244506,0.00067155],"domain_scores_gemma":[0.842156,0.12626491,0.017030114,0.0041100704,0.009392186,0.0010467927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03697263,0.0024780498,0.012053638,0.039611075,0.0016769073,0.004698299,0.004440672,0.0033856828,0.008210144],"category_scores_gemma":[0.18140885,0.0016442913,0.008898073,0.030220868,0.0022962452,0.004520833,0.0050026337,0.0022894659,0.0007471649],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019283108,0.000035738194,0.0008553238,0.9555324,0.00887871,0.00014151348,0.00063957565,0.0003312133,0.0001889496,0.0009909878,0.0018251041,0.030387616],"study_design_scores_gemma":[0.00037096225,0.00029244923,0.0035060844,0.91115236,0.05755554,0.0003181262,0.0012395943,0.00024779118,0.00030692687,0.0017134311,0.023224922,0.000071884],"about_ca_topic_score_codex":0.018305609,"about_ca_topic_score_gemma":0.053373788,"teacher_disagreement_score":0.039611075,"about_ca_system_score_codex":0.008585108,"about_ca_system_score_gemma":0.046945177,"threshold_uncertainty_score":0.19553226},"labels":[],"label_agreement":null},{"id":"W4310849374","doi":"10.1016/j.autcon.2022.104691","title":"To imitate or not to imitate: Boosting reinforcement learning-based construction robotic control for long-horizon tasks using virtual demonstrations","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reinforcement learning; Teleoperation; Boosting (machine learning); Robot; Computer science; Artificial intelligence; Adaptability; Control (management); Human–computer interaction; Machine learning; Engineering","score_opus":0.023826090924791637,"score_gpt":0.26903240450617777,"score_spread":0.24520631358138614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310849374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31609142,0.00063468295,0.6777181,0.00036563195,0.00014770936,0.00011038344,0.000029828365,0.0009079517,0.0039943815],"genre_scores_gemma":[0.9833377,0.000047362093,0.015815428,0.00005518928,0.0000122731235,0.000033258817,0.000017318975,0.0000200107,0.00066146214],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996178,0.0001258333,0.000018382703,0.0000904617,0.00007579783,0.00007171809],"domain_scores_gemma":[0.99756455,0.0015357025,0.00023802683,0.00015156536,0.00034290968,0.00016719033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016743452,0.0008364573,0.00083593937,0.00022778318,0.00028363176,0.00039227563,0.00094822596,0.00075259863,0.0014228468],"category_scores_gemma":[0.005329836,0.0003431884,0.00028768997,0.00012771034,0.0008276823,0.000727569,0.0011497648,0.0012962063,0.00023820398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034772544,0.00025811818,0.0011682162,0.00007158871,0.00004765658,0.000053067295,0.00006845579,0.9124459,0.0067428425,0.0019064087,0.00079090707,0.07609907],"study_design_scores_gemma":[0.000010083177,0.00007618978,0.00012220588,0.000003022231,0.000003862935,0.0000058465303,0.0000028903778,0.9987967,0.0004836707,0.0004350814,0.00005764439,0.0000027933427],"about_ca_topic_score_codex":0.0028372095,"about_ca_topic_score_gemma":0.0021425926,"teacher_disagreement_score":0.0028372095,"about_ca_system_score_codex":0.00041002533,"about_ca_system_score_gemma":0.0006386683,"threshold_uncertainty_score":0.008854866},"labels":[],"label_agreement":null},{"id":"W4313855821","doi":"10.1016/j.autcon.2022.104738","title":"3D standard motion time-based ergonomic risk analysis for workplace design in modular construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Motion (physics); Human factors and ergonomics; Engineering; Risk analysis (engineering); Computer science; Simulation; Industrial engineering; Poison control; Artificial intelligence","score_opus":0.05248432820409936,"score_gpt":0.408013984011943,"score_spread":0.3555296558078436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313855821","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47076494,0.00020280032,0.5243775,0.00005788845,0.000030945233,0.00013533025,0.00090677897,0.00087149296,0.002652305],"genre_scores_gemma":[0.92273563,0.00012334583,0.075260036,0.000016875823,0.0000063512402,0.000094642724,0.0006306306,0.00008736383,0.0010451461],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994295,0.00011571104,0.000032696837,0.0000686935,0.00030591228,0.000047474994],"domain_scores_gemma":[0.9993467,0.0002458724,0.00011884567,0.00006741839,0.0001920064,0.00002906642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059024245,0.0008346404,0.000475604,0.0019245717,0.00022294417,0.00092859584,0.0005014569,0.0006302951,0.0024594318],"category_scores_gemma":[0.0016942975,0.00041906466,0.0010634373,0.000823172,0.00023650263,0.00043713272,0.00072104554,0.00023825304,0.00041145546],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085739547,0.00043166813,0.03290529,0.0004154219,0.00022756468,0.00024966436,0.00060515426,0.6328611,0.05329788,0.003584704,0.0015855298,0.27297863],"study_design_scores_gemma":[0.000012924115,0.00027836298,0.024506377,0.000027666005,0.000049818475,0.00011947538,0.00012646281,0.9667536,0.0062296353,0.00093034166,0.0009266134,0.00003871207],"about_ca_topic_score_codex":0.0044925436,"about_ca_topic_score_gemma":0.004856113,"teacher_disagreement_score":0.0044925436,"about_ca_system_score_codex":0.00037815128,"about_ca_system_score_gemma":0.00064002594,"threshold_uncertainty_score":0.008932829},"labels":[],"label_agreement":null},{"id":"W4319067350","doi":"10.1016/j.autcon.2023.104774","title":"Digital twin development through auto-linking to manage legacy assets in nuclear power plants","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Pipeline (software); Asset (computer security); Context (archaeology); Nuclear power; Computer science; Key (lock); Asset management; Legacy system; Object (grammar); Nuclear power plant; Digital asset management; Configuration Management (ITSM); Systems engineering; Risk analysis (engineering); Computer security; Engineering; Operating system; Business; Software; Artificial intelligence","score_opus":0.020942628520469207,"score_gpt":0.23610172004478674,"score_spread":0.21515909152431753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319067350","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6319872,0.00027766716,0.32076642,0.00020549605,0.00008491527,0.00011846866,0.00022726803,0.002840034,0.04349254],"genre_scores_gemma":[0.899778,0.00014517101,0.08906513,0.000026307374,0.0000067524406,0.00002759562,0.00029010276,0.00019317989,0.010467781],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996233,0.000053486172,0.000018075572,0.00008386436,0.0001701297,0.00005100173],"domain_scores_gemma":[0.9994566,0.000090748654,0.000047205936,0.00021094985,0.00013558155,0.000059005335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006525957,0.00020357948,0.0001667402,0.001022264,0.000525201,0.0015373966,0.00073500944,0.00039369697,0.004278121],"category_scores_gemma":[0.001448434,0.00023270726,0.00017354182,0.0014534766,0.00041572517,0.0028433774,0.002050559,0.00048716518,0.00078021357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023350398,0.0003147586,0.019202616,0.000117210446,0.000031884523,0.00054341136,0.0020939098,0.073400006,0.03667234,0.032793198,0.0056486367,0.8289485],"study_design_scores_gemma":[0.00003701467,0.00047150292,0.020913046,0.000090254,0.000098758035,0.0010544453,0.0034068616,0.7307118,0.114902444,0.020907247,0.10732871,0.00007793436],"about_ca_topic_score_codex":0.0027597097,"about_ca_topic_score_gemma":0.0037959286,"teacher_disagreement_score":0.004278121,"about_ca_system_score_codex":0.0004772901,"about_ca_system_score_gemma":0.00078917196,"threshold_uncertainty_score":0.014311731},"labels":[],"label_agreement":null},{"id":"W4320518953","doi":"10.1016/j.autcon.2023.104771","title":"Hybrid DNN training using both synthetic and real construction images to overcome training data shortage","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Economic shortage; Artificial intelligence; Training (meteorology); Field (mathematics); Computer science; Automation; Artificial neural network; Synthetic data; Training set; Machine learning; Engineering","score_opus":0.09673258083927715,"score_gpt":0.2900833869106985,"score_spread":0.19335080607142136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320518953","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4362774,0.0019523018,0.53116214,0.00045948103,0.0007292416,0.00019009676,0.0018242529,0.0074522444,0.019952781],"genre_scores_gemma":[0.8450335,0.000387722,0.14210652,0.00033632392,0.00006193638,0.000095261516,0.004608185,0.00024129394,0.00712916],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957675,0.00006561394,0.000028243167,0.00015175612,0.00009244774,0.00008513672],"domain_scores_gemma":[0.99936026,0.00019851669,0.000020718155,0.0001249834,0.00027172235,0.000023830717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009458375,0.001116111,0.00051942864,0.00084187824,0.00039967976,0.0005409569,0.00088329706,0.0009617991,0.002603542],"category_scores_gemma":[0.0015469902,0.00042301163,0.0005711945,0.0009024428,0.00034053696,0.0010215995,0.00064279087,0.00094417407,0.0010958267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055019377,0.0003384929,0.0057435175,0.00022029849,0.0001535197,0.00031506747,0.000114614624,0.19283211,0.04541854,0.001054448,0.008952373,0.7443068],"study_design_scores_gemma":[0.000021844222,0.00007760359,0.002935121,0.000032478027,0.00007865761,0.00008875736,0.000067292254,0.96789664,0.024649322,0.00073350634,0.0034032334,0.000015477144],"about_ca_topic_score_codex":0.015498941,"about_ca_topic_score_gemma":0.019835519,"teacher_disagreement_score":0.015498941,"about_ca_system_score_codex":0.0004523046,"about_ca_system_score_gemma":0.0007987353,"threshold_uncertainty_score":0.03081745},"labels":[],"label_agreement":null},{"id":"W4321768227","doi":"10.1016/j.autcon.2023.104808","title":"Optimized decision support for BIM maturity assessment","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Research Grants Council, University Grants Committee; National Social Science Fund of China; National Natural Science Foundation of China; City University of Hong Kong","keywords":"Maturity (psychological); Capability Maturity Model; Building information modeling; Process (computing); Function (biology); Engineering; Process management; Systems engineering; Risk analysis (engineering); Computer science; Operations management; Business; Software","score_opus":0.01209271287198242,"score_gpt":0.2770197122604636,"score_spread":0.2649269993884812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321768227","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06306573,0.00016855722,0.9273599,0.0001767356,0.000049906455,0.00012084881,0.00056845386,0.0036551575,0.004834697],"genre_scores_gemma":[0.75906473,0.00009434682,0.23814288,0.000059605012,0.000022201657,0.000092056405,0.0008117122,0.0002082561,0.0015042974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99825114,0.0005582623,0.00012231269,0.00020946251,0.0006651551,0.00019351396],"domain_scores_gemma":[0.997294,0.0014429274,0.00018040274,0.00026485082,0.0007287349,0.00008912427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014855809,0.00087854126,0.0008671531,0.0016235173,0.00044575793,0.0027792724,0.0010176197,0.0007357299,0.007697461],"category_scores_gemma":[0.007995691,0.00052921,0.00058142876,0.0012851714,0.0002668585,0.0015519216,0.001227871,0.0007736481,0.0017068004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013680886,0.0003853629,0.004839398,0.000208626,0.00012584722,0.00022768631,0.0002139366,0.49876067,0.016632514,0.019954462,0.006462673,0.4508207],"study_design_scores_gemma":[0.000017172106,0.00003947154,0.0004366804,0.00000881392,0.000014111952,0.000016605029,0.000026356454,0.990761,0.004108812,0.0037456895,0.00081624195,0.0000090069625],"about_ca_topic_score_codex":0.005212369,"about_ca_topic_score_gemma":0.0055012885,"teacher_disagreement_score":0.007697461,"about_ca_system_score_codex":0.0007586455,"about_ca_system_score_gemma":0.0014507911,"threshold_uncertainty_score":0.025750577},"labels":[],"label_agreement":null},{"id":"W4322490938","doi":"10.1016/j.autcon.2023.104803","title":"Computer vision-based process time data acquisition for offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Alberta Innovates","keywords":"Workstation; Data acquisition; Factory (object-oriented programming); Process (computing); Engineering; Framing (construction); Real-time computing; Computer science; Frame (networking); Set (abstract data type); Simulation; Engineering drawing; Operating system; Mechanical engineering; Civil engineering","score_opus":0.012130677545308508,"score_gpt":0.2606846631337291,"score_spread":0.24855398558842062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322490938","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21689102,0.0004187441,0.76528907,0.00016395001,0.00015620278,0.00019158269,0.00074394635,0.004945402,0.011200168],"genre_scores_gemma":[0.7653108,0.00024227164,0.22781977,0.000078691,0.00003431309,0.00009133854,0.0011295468,0.00022386387,0.0050693816],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99946934,0.000054987293,0.000017658595,0.0000898786,0.00031471282,0.00005346009],"domain_scores_gemma":[0.99955374,0.000054415,0.000043706586,0.000059869293,0.00025736415,0.000030861953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036113945,0.00038138768,0.0004932318,0.0014929154,0.0002875515,0.0007793969,0.00060239836,0.00045772156,0.0036212415],"category_scores_gemma":[0.0007402908,0.00026540685,0.00023258236,0.0011638941,0.00020187271,0.00069325615,0.0005989715,0.00057554763,0.0011980457],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007249053,0.00048073026,0.0042368416,0.00017212573,0.00003978744,0.00011929307,0.00016782494,0.017383436,0.2462521,0.002293811,0.0071683507,0.72096074],"study_design_scores_gemma":[0.00004362985,0.00036460208,0.02572702,0.000034793407,0.000056312376,0.0004422212,0.00018095026,0.7899797,0.1666638,0.0018709232,0.014556991,0.00007917973],"about_ca_topic_score_codex":0.003487767,"about_ca_topic_score_gemma":0.005397006,"teacher_disagreement_score":0.0036212415,"about_ca_system_score_codex":0.00033225946,"about_ca_system_score_gemma":0.0009908275,"threshold_uncertainty_score":0.012114286},"labels":[],"label_agreement":null},{"id":"W4327963475","doi":"10.1016/j.autcon.2023.104782","title":"BIM-driven computational design for robotic manufacturing in off-site construction: an integrated Design-to-Manufacturing (DtM) approach","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Interoperability; Robotics; Systems engineering; Context (archaeology); Operationalization; Information exchange; Engineering; Robot; Artificial intelligence; Manufacturing engineering; Data exchange; Software engineering; Computer science; Database; World Wide Web","score_opus":0.02880983547325586,"score_gpt":0.24227575331367424,"score_spread":0.21346591784041838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4327963475","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010229435,0.000083321225,0.97879595,0.00018045919,0.000044629145,0.00005476949,0.00010992666,0.0003812754,0.010120233],"genre_scores_gemma":[0.45628932,0.00023371856,0.53613895,0.00023031463,0.00003694019,0.0003315095,0.00036650812,0.0004892457,0.0058834697],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995285,0.0001355772,0.000016409891,0.00005445215,0.00021331465,0.000051699797],"domain_scores_gemma":[0.9993401,0.0003247194,0.000059852217,0.00010521284,0.00013357491,0.000036542744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008239881,0.00077371224,0.0012061031,0.00077659555,0.0006861221,0.0016382165,0.0021630875,0.0013292421,0.0064212875],"category_scores_gemma":[0.0019943377,0.0010649206,0.0012463126,0.000612971,0.00095198496,0.0010300644,0.0023109743,0.0013300532,0.00095543556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021874628,0.000050270664,0.00025313636,0.000057353333,0.000016086418,0.000043140237,0.0000507577,0.9663588,0.0011676998,0.01931168,0.0005049714,0.012164174],"study_design_scores_gemma":[0.0000033771594,0.000007699155,0.000041376497,0.000004894861,0.0000026722332,0.000009454277,0.000012291734,0.9944535,0.00034390175,0.0042571872,0.0008609087,0.0000027346696],"about_ca_topic_score_codex":0.0042521353,"about_ca_topic_score_gemma":0.0066826288,"teacher_disagreement_score":0.0064212875,"about_ca_system_score_codex":0.0007922809,"about_ca_system_score_gemma":0.0019472528,"threshold_uncertainty_score":0.021481395},"labels":[],"label_agreement":null},{"id":"W4362703390","doi":"10.1016/j.autcon.2023.104859","title":"Dynamic integration of unstructured data with BIM using a no-model approach based on machine learning and concept networks","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Unstructured data; Generalizability theory; Classifier (UML); Artificial intelligence; Parametric statistics; Machine learning; Data mining; Data science; Natural language processing; Big data","score_opus":0.014153410771090382,"score_gpt":0.2392545917782159,"score_spread":0.2251011810071255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362703390","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013771812,0.00010630184,0.98388094,0.00009781271,0.000036326634,0.000033908233,0.00007507038,0.00026951995,0.001728379],"genre_scores_gemma":[0.5352337,0.00034541328,0.4603611,0.00007118031,0.000057905283,0.00017540347,0.00059130904,0.00021022657,0.0029537072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987301,0.00035003843,0.000064558284,0.00029855152,0.00046885057,0.000087932334],"domain_scores_gemma":[0.99837875,0.00082132843,0.00016319864,0.00027686096,0.00030860692,0.000051256444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001478352,0.0008559174,0.0012962439,0.0017256899,0.00075433234,0.0023916718,0.0015302917,0.00083659723,0.0020045168],"category_scores_gemma":[0.005531064,0.00095025136,0.001115155,0.0024150386,0.0010309927,0.005096691,0.0030343365,0.0012744082,0.00042768993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078517805,0.00009914247,0.0014741808,0.00009831175,0.000079408426,0.00015801878,0.00019958537,0.8730257,0.0024647808,0.035670627,0.000762093,0.08588964],"study_design_scores_gemma":[0.0000020440766,0.000009445776,0.00022509432,0.00000613912,0.000009614622,0.000014384599,0.000025712769,0.9892518,0.0006024988,0.009193803,0.0006530066,0.000006451044],"about_ca_topic_score_codex":0.0114294,"about_ca_topic_score_gemma":0.0120678125,"teacher_disagreement_score":0.0114294,"about_ca_system_score_codex":0.0010124067,"about_ca_system_score_gemma":0.0013338812,"threshold_uncertainty_score":0.022725761},"labels":[],"label_agreement":null},{"id":"W4366765123","doi":"10.1016/j.autcon.2023.104885","title":"Deep learning-based active noise control on construction sites","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Noise Effects and Management","field":"Health Professions","cited_by":85,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Canada Foundation for Innovation; Research Manitoba","keywords":"Active noise control; Feed forward; Noise (video); Noise control; Controller (irrigation); Transient (computer programming); Engineering; Noise pollution; Broadband; Computer science; Attenuation; Nonlinear system; Electronic engineering; Control (management); Control engineering; Control theory (sociology); Telecommunications; Channel (broadcasting); Artificial intelligence; Noise reduction","score_opus":0.02029694817886248,"score_gpt":0.34810744790209686,"score_spread":0.3278104997232344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366765123","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24634646,0.0006468539,0.74517506,0.00043499772,0.0001871059,0.00004287909,0.00032619666,0.0019802318,0.0048603024],"genre_scores_gemma":[0.9645756,0.00010338273,0.030550815,0.00008860081,0.000035442743,0.000028547403,0.00038893693,0.000067330766,0.0041614557],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996853,0.00004695378,0.0000098802475,0.00009335541,0.00006792437,0.000096565134],"domain_scores_gemma":[0.9995384,0.00017431706,0.000034926143,0.000045372566,0.0001626924,0.000044329376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046578192,0.00073145947,0.00078035303,0.0004926193,0.0003633903,0.0006389831,0.0012523297,0.0010000645,0.0019917039],"category_scores_gemma":[0.0012083403,0.00041837507,0.00067315553,0.00053217425,0.00044710803,0.00071154354,0.00097419467,0.0011052034,0.0004165592],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031993017,0.00024093143,0.002708931,0.000061975115,0.000055088964,0.00006624231,0.000045005287,0.8220344,0.006808589,0.0016628939,0.0023183732,0.16367765],"study_design_scores_gemma":[0.0000030836559,0.000012225675,0.00025953,0.0000021623787,0.0000034978739,0.0000021658666,0.0000050310864,0.9986223,0.00058031094,0.00040923886,0.00009840339,0.0000020030973],"about_ca_topic_score_codex":0.017773537,"about_ca_topic_score_gemma":0.02110523,"teacher_disagreement_score":0.017773537,"about_ca_system_score_codex":0.00071868015,"about_ca_system_score_gemma":0.0009588201,"threshold_uncertainty_score":0.03534019},"labels":[],"label_agreement":null},{"id":"W4375861796","doi":"10.1016/j.autcon.2023.104901","title":"Actively-exploring thermography-enabled autonomous robotic system for detecting and registering HVAC thermal leaks","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Ceiling (cloud); HVAC; Thermal; Leak; Automation; Computer science; Robot; Engineering; Thermal comfort; Thermography; Leak detection; Simulation; Real-time computing; Artificial intelligence; Mechanical engineering; Air conditioning; Structural engineering; Infrared","score_opus":0.023230891721089608,"score_gpt":0.21178638228634147,"score_spread":0.18855549056525187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4375861796","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45531997,0.00062830956,0.5326855,0.00013762666,0.00013080631,0.0001110613,0.00016017677,0.0033588954,0.007467665],"genre_scores_gemma":[0.964039,0.00008643715,0.032949883,0.000061672305,0.0000140339,0.000046715646,0.000050446717,0.000026273192,0.0027255379],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998634,0.000015557673,0.0000046117693,0.000047415317,0.00004702955,0.00002188757],"domain_scores_gemma":[0.99985504,0.000031560365,0.000034159246,0.000023965413,0.000031503416,0.00002371048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013091952,0.00043248467,0.00039847946,0.000246844,0.00027146138,0.00033894664,0.00069422444,0.00041709206,0.0013737326],"category_scores_gemma":[0.00030312914,0.00023194104,0.0002462568,0.00013140567,0.0002598084,0.00044857443,0.0007267573,0.00023609327,0.00036508936],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005721867,0.00023279784,0.0049751974,0.00028096692,0.000059303722,0.00052020984,0.00038817036,0.034876995,0.7585772,0.0013687654,0.0016384015,0.19650982],"study_design_scores_gemma":[0.00009328749,0.001583428,0.019331086,0.000047251688,0.00014115065,0.0010259899,0.00023907542,0.7108232,0.2533948,0.0022949502,0.010896128,0.00012958371],"about_ca_topic_score_codex":0.0006791251,"about_ca_topic_score_gemma":0.0011832054,"teacher_disagreement_score":0.0013737326,"about_ca_system_score_codex":0.00012022059,"about_ca_system_score_gemma":0.0005017706,"threshold_uncertainty_score":0.0045956373},"labels":[],"label_agreement":null},{"id":"W4378895275","doi":"10.1016/j.autcon.2023.104956","title":"Robot morphology evolution for automated HVAC system inspections using graph heuristic search and reinforcement learning","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Modular Robots and Swarm Intelligence","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Stroke Consortium; China Scholarship Council","keywords":"HVAC; Robot; Reinforcement learning; Ceiling (cloud); Air conditioning; Automation; Computer science; Heuristic; Efficient energy use; Simulation; Engineering; Artificial intelligence; Mechanical engineering","score_opus":0.023898017999762457,"score_gpt":0.26892674121512194,"score_spread":0.24502872321535948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378895275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2582989,0.0002629564,0.7326696,0.00033745245,0.00006089483,0.00013314791,0.000048379778,0.00051136356,0.0076772124],"genre_scores_gemma":[0.93821937,0.000053172822,0.05996667,0.000049569375,0.000010094351,0.00008170271,0.000037921185,0.000047904923,0.0015337027],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999835,0.000063625404,0.0000063690036,0.00002865878,0.00003939786,0.00002694406],"domain_scores_gemma":[0.9990237,0.0006266566,0.00010376853,0.000049184047,0.00014182774,0.000054946162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000709428,0.0005397764,0.0007467812,0.0009493907,0.00045727257,0.00049056526,0.00081160676,0.0009916371,0.0014750944],"category_scores_gemma":[0.0021419504,0.00042222725,0.00060040073,0.00040304943,0.00090223603,0.0005408698,0.0006908821,0.00056520134,0.00013281479],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022241205,0.000027287033,0.00036255558,0.00001252258,0.000014001358,0.00002541952,0.000026804028,0.98721373,0.0007272234,0.0013268787,0.00014560713,0.010095732],"study_design_scores_gemma":[0.0000052588825,0.00001546167,0.000062270134,0.0000013225286,0.0000023367595,0.000003546325,0.0000037336183,0.99940896,0.000083664825,0.00037518362,0.00003696138,0.0000013284218],"about_ca_topic_score_codex":0.00924654,"about_ca_topic_score_gemma":0.00613244,"teacher_disagreement_score":0.00924654,"about_ca_system_score_codex":0.0010387013,"about_ca_system_score_gemma":0.0009140192,"threshold_uncertainty_score":0.01838541},"labels":[],"label_agreement":null},{"id":"W4379624712","doi":"10.1016/j.autcon.2023.104952","title":"Operations planning and scheduling in off-site construction supply chain management: Scope definition and future directions","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Supply chain; Supply chain management; Procurement; Computer science; Scope (computer science); Process management; Integrated business planning; Operations research; Operations management; Systems engineering; Engineering; Business","score_opus":0.00918398281345273,"score_gpt":0.21978350245852346,"score_spread":0.21059951964507073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379624712","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13346902,0.09287826,0.69082576,0.017118754,0.0005167765,0.00043512668,0.0003949835,0.00061381806,0.063747525],"genre_scores_gemma":[0.7241279,0.05234364,0.2142722,0.00064352393,0.00089645735,0.00017685782,0.0006069052,0.00011395823,0.006818561],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972861,0.0014151275,0.0002000007,0.00034129544,0.0004994516,0.00025804553],"domain_scores_gemma":[0.9900703,0.005658702,0.0009155643,0.00053671066,0.002267243,0.000551536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007225129,0.00080651697,0.0010966611,0.0026385102,0.0007438833,0.0077195163,0.0022307723,0.0016117386,0.0035893468],"category_scores_gemma":[0.0072199763,0.00052180834,0.0006652802,0.007977829,0.001985082,0.0077949543,0.0016164059,0.0009985024,0.00056624494],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025474557,0.00061390136,0.019875368,0.0013196907,0.000100693156,0.00012460702,0.0011804021,0.097114116,0.00208808,0.15731023,0.0041774805,0.71584064],"study_design_scores_gemma":[0.00005603352,0.0004950013,0.016111674,0.0020430062,0.00018015176,0.00031495374,0.010745526,0.60559773,0.004599825,0.26985398,0.08987726,0.0001248676],"about_ca_topic_score_codex":0.015405243,"about_ca_topic_score_gemma":0.010637882,"teacher_disagreement_score":0.015405243,"about_ca_system_score_codex":0.0029941937,"about_ca_system_score_gemma":0.0070117055,"threshold_uncertainty_score":0.03821057},"labels":[],"label_agreement":null},{"id":"W4380766006","doi":"10.1016/j.autcon.2023.104966","title":"Guided wave and genetic algorithm-based inversion for characterization of pile foundations","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Ultrasonics and Acoustic Wave Propagation","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"China Scholarship Council; Ministry of Education of the People's Republic of China; Polytechnique Montréal","keywords":"Pile; Inversion (geology); Algorithm; Dispersion relation; Resonance (particle physics); Boundary value problem; Engineering; Acoustics; Mathematical analysis; Computer science; Mathematics; Geology; Physics; Optics","score_opus":0.01595883391133188,"score_gpt":0.22588630216210745,"score_spread":0.20992746825077557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380766006","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022977557,0.000053299802,0.9755761,0.000031136944,0.0000088936495,0.000021693806,0.000021387845,0.00039554844,0.0009143866],"genre_scores_gemma":[0.49917644,0.00010719962,0.49851635,0.000055268647,0.000012453562,0.000121805104,0.00018285609,0.00008179168,0.0017458044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997441,0.000050190807,0.000008950981,0.000045913,0.00012472559,0.000026023257],"domain_scores_gemma":[0.9996989,0.00013085091,0.000054460805,0.00003362203,0.00007158322,0.00001059996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025841483,0.0005897869,0.00039129614,0.0009146137,0.00025200404,0.0004000663,0.0005424018,0.0005819089,0.00086593896],"category_scores_gemma":[0.0010308493,0.00024967917,0.0004177815,0.00053016376,0.00046963117,0.0006645091,0.00044596026,0.000477488,0.00034777753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013990069,0.00011293936,0.0024008895,0.0001212275,0.000062354855,0.00012328273,0.00015080231,0.65444887,0.08959253,0.0077079674,0.00070106215,0.24443814],"study_design_scores_gemma":[0.000004543513,0.000020082149,0.00036533616,0.000003749076,0.0000047979956,0.00003116141,0.000011740477,0.9919723,0.006409166,0.00083940057,0.0003286159,0.000009060915],"about_ca_topic_score_codex":0.0040482194,"about_ca_topic_score_gemma":0.004653559,"teacher_disagreement_score":0.0040482194,"about_ca_system_score_codex":0.00038344,"about_ca_system_score_gemma":0.0007942765,"threshold_uncertainty_score":0.008049309},"labels":[],"label_agreement":null},{"id":"W4380929354","doi":"10.1016/j.autcon.2023.104980","title":"Computer vision applications in offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Alberta Innovates","keywords":"Field (mathematics); Computer science; Computer technology; Machine vision; Point (geometry); Computer Applications; Risk analysis (engineering); Engineering management; Engineering; Systems engineering; Artificial intelligence; Multimedia","score_opus":0.0059844435924937805,"score_gpt":0.22620193324628818,"score_spread":0.2202174896537944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380929354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11436343,0.0155512225,0.7705565,0.0027041389,0.00096445886,0.00015681543,0.0002650205,0.0027859227,0.092652515],"genre_scores_gemma":[0.7623356,0.008404697,0.20219773,0.00059108663,0.00033288187,0.000050544917,0.0004164009,0.00023224179,0.025438838],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993554,0.00021928323,0.000027581806,0.00011594591,0.00020488215,0.00007679558],"domain_scores_gemma":[0.99894506,0.00037381207,0.000048271733,0.0001139338,0.00044018886,0.000078890065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007451014,0.00052431464,0.0005800309,0.002525553,0.00056886126,0.0022571706,0.00089659204,0.0015350897,0.006562875],"category_scores_gemma":[0.001988256,0.00035822194,0.0005693747,0.0028445323,0.00062964275,0.00096950255,0.0009183611,0.0008380708,0.0017557497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001165169,0.0003159447,0.0039969576,0.00034852696,0.00004689851,0.00042073385,0.0004878997,0.027416397,0.018946897,0.02238945,0.013201584,0.91231215],"study_design_scores_gemma":[0.000035126934,0.000392542,0.021092022,0.00040099447,0.000120429424,0.002531771,0.0017590936,0.7221093,0.040987216,0.06462155,0.14582807,0.00012192514],"about_ca_topic_score_codex":0.008628831,"about_ca_topic_score_gemma":0.010260521,"teacher_disagreement_score":0.008628831,"about_ca_system_score_codex":0.0007119539,"about_ca_system_score_gemma":0.00083341176,"threshold_uncertainty_score":0.021955073},"labels":[],"label_agreement":null},{"id":"W4381158217","doi":"10.1016/j.autcon.2023.104981","title":"Two-stage clustering for improve indoor positioning accuracy","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Indoor and Outdoor Localization Technologies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ericsson (Canada); University of Regina","funders":"","keywords":"Cluster analysis; Computer science; Process (computing); Matching (statistics); Data mining; Fingerprint (computing); Positioning technology; Key (lock); Artificial intelligence; Real-time computing","score_opus":0.011723178599109582,"score_gpt":0.2619654110625235,"score_spread":0.2502422324634139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381158217","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025553178,0.00027832872,0.97037536,0.00007288055,0.00015727748,0.00007393504,0.00018368532,0.0018168311,0.0014885608],"genre_scores_gemma":[0.38484427,0.00028941937,0.60411495,0.00013247368,0.00013369018,0.00018082175,0.0015490869,0.00044842204,0.008306869],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998497,0.00017098573,0.00008636211,0.00039161596,0.00061651005,0.00023746083],"domain_scores_gemma":[0.9985014,0.00028551192,0.00006560607,0.0002987645,0.00079081074,0.000057919635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006396381,0.0012948655,0.0015421559,0.0013792523,0.0012097936,0.0007983693,0.0023731424,0.0012663485,0.0025491526],"category_scores_gemma":[0.0022571094,0.0006567867,0.0013084126,0.002357871,0.0003339696,0.0012695688,0.001378266,0.0009627004,0.0018124405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009521297,0.00042289137,0.0037258228,0.00029832547,0.00024926857,0.00016372302,0.00034445547,0.22898328,0.07435655,0.0040983427,0.010470916,0.6759343],"study_design_scores_gemma":[0.000028898794,0.00011434502,0.002339592,0.000008464454,0.00005426131,0.00009937955,0.000055504235,0.9739812,0.01992281,0.0010328129,0.0023222505,0.00004054411],"about_ca_topic_score_codex":0.018046252,"about_ca_topic_score_gemma":0.02350392,"teacher_disagreement_score":0.018046252,"about_ca_system_score_codex":0.00065401907,"about_ca_system_score_gemma":0.0017113497,"threshold_uncertainty_score":0.035882413},"labels":[],"label_agreement":null},{"id":"W4381546655","doi":"10.1016/j.autcon.2023.105001","title":"Self-supervised contrastive video representation learning for construction equipment activity recognition on limited dataset","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Artificial intelligence; Machine learning; Supervised learning; Semi-supervised learning; Exploit; Labeled data; Activity recognition; Annotation; Representation (politics); Pattern recognition (psychology); Artificial neural network","score_opus":0.0228214098325876,"score_gpt":0.2693062585456524,"score_spread":0.24648484871306478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381546655","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63268936,0.0077180495,0.29365346,0.00078164146,0.0009941148,0.00071046385,0.03841406,0.014901756,0.010137064],"genre_scores_gemma":[0.7644385,0.0010266929,0.11466995,0.000365288,0.0002613186,0.00042498353,0.10951803,0.00025671138,0.009038427],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992093,0.000118858006,0.00003759752,0.00033064923,0.00014655394,0.00015705229],"domain_scores_gemma":[0.9992361,0.00021781861,0.00006478192,0.00021842518,0.0002124087,0.000050457216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082098524,0.0012577544,0.0011299041,0.0014888395,0.0003557008,0.0005980759,0.0014881301,0.001239914,0.0018111228],"category_scores_gemma":[0.0021127095,0.0002255791,0.0011097568,0.0013530466,0.00032768302,0.00088177546,0.00077844044,0.0011624065,0.0017935886],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013172849,0.0019031215,0.010373875,0.0007347414,0.0003712084,0.0004191478,0.000083957246,0.044335436,0.047911994,0.0008942603,0.06414601,0.82750905],"study_design_scores_gemma":[0.0001050444,0.0005014696,0.019364893,0.0001092864,0.00020460621,0.00049128354,0.0001530591,0.936302,0.028997703,0.001460351,0.012253332,0.00005690744],"about_ca_topic_score_codex":0.010717968,"about_ca_topic_score_gemma":0.01920759,"teacher_disagreement_score":0.010717968,"about_ca_system_score_codex":0.0005051775,"about_ca_system_score_gemma":0.0008819217,"threshold_uncertainty_score":0.021311164},"labels":[],"label_agreement":null},{"id":"W4383531718","doi":"10.1016/j.autcon.2023.104967","title":"Using convex hulls with octree/voxel representations of point clouds to assess road and roadside geometric design for automated vehicles","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Remote Sensing and LiDAR Applications","field":"Environmental Science","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Alberta Environment and Protected Areas; University of Alberta","funders":"","keywords":"Point cloud; Octree; Convex hull; Segmentation; Computer science; Point (geometry); Set (abstract data type); Road surface; Regular polygon; Computer vision; Polyhedron; Artificial intelligence; Engineering; Mathematics; Geometry","score_opus":0.053777730795379904,"score_gpt":0.31861509367791696,"score_spread":0.26483736288253706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383531718","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24884109,0.00015810621,0.7460892,0.00008973584,0.000025886695,0.00018248137,0.00060621195,0.0017077498,0.0022995225],"genre_scores_gemma":[0.7947268,0.00012605962,0.20320095,0.000021968304,0.000008665284,0.00007093349,0.0010271672,0.00022084289,0.00059663417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921596,0.00018495579,0.000037294405,0.00008717559,0.00036832664,0.000106330255],"domain_scores_gemma":[0.99778605,0.0009456618,0.00027276762,0.00028077266,0.0005764174,0.00013833318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008621571,0.0008120145,0.00074331916,0.0031235132,0.00043687754,0.0021625317,0.0008224514,0.0007991327,0.001641368],"category_scores_gemma":[0.004163298,0.00075857533,0.0010746594,0.0017473806,0.0005543335,0.0014962701,0.0013506319,0.0007904175,0.0006519951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004626303,0.00035913853,0.010769148,0.00014049072,0.00014795622,0.00015465422,0.0003099016,0.75131184,0.0145927705,0.0046182647,0.0016051073,0.21552809],"study_design_scores_gemma":[0.000004937316,0.000030671545,0.00094628386,0.000007143167,0.000006404761,0.00002089815,0.000050678318,0.996461,0.0014424531,0.0008267425,0.0001949166,0.000007970671],"about_ca_topic_score_codex":0.017468974,"about_ca_topic_score_gemma":0.014091748,"teacher_disagreement_score":0.017468974,"about_ca_system_score_codex":0.0006443694,"about_ca_system_score_gemma":0.0012681694,"threshold_uncertainty_score":0.034734607},"labels":[],"label_agreement":null},{"id":"W4385657805","doi":"10.1016/j.autcon.2023.105045","title":"Quality assurance for building components through point cloud segmentation leveraging synthetic data","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":49,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Point cloud; Segmentation; Quality assurance; Workload; Computer science; Schedule; Point (geometry); Quality (philosophy); Field (mathematics); Data mining; Cloud computing; Artificial intelligence; Engineering; Operations management","score_opus":0.11338960920594728,"score_gpt":0.3304664351853311,"score_spread":0.21707682597938383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385657805","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09724612,0.0002904803,0.8960502,0.000140766,0.000054609358,0.00007217454,0.00043124004,0.004409268,0.001305129],"genre_scores_gemma":[0.7690693,0.00018021656,0.22774401,0.000054523523,0.000018850516,0.00004208697,0.0016417662,0.0005646048,0.0006846068],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99761033,0.00025184752,0.00012274207,0.00032874686,0.0015296505,0.0001567956],"domain_scores_gemma":[0.9948673,0.0009521645,0.00062004983,0.0012861119,0.002170371,0.00010404801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018397332,0.0009608008,0.0006519038,0.0020256292,0.00047077477,0.0023151403,0.0010249629,0.0007862872,0.0015824791],"category_scores_gemma":[0.0066595185,0.0005353913,0.0007476022,0.0014239107,0.00076268334,0.0013915481,0.0014144784,0.000791627,0.0008090852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007388623,0.0001801727,0.026053058,0.00044513124,0.0001401873,0.00022885876,0.00054109655,0.32694656,0.14111264,0.0055397903,0.00438901,0.49368462],"study_design_scores_gemma":[0.000013734744,0.00008842394,0.0075869784,0.000028934439,0.00003371345,0.00013757995,0.000096758326,0.9390186,0.048030183,0.0022790302,0.0026635744,0.00002252312],"about_ca_topic_score_codex":0.0050110496,"about_ca_topic_score_gemma":0.0063434616,"teacher_disagreement_score":0.0050110496,"about_ca_system_score_codex":0.000795072,"about_ca_system_score_gemma":0.0013804435,"threshold_uncertainty_score":0.009963751},"labels":[],"label_agreement":null},{"id":"W4385753057","doi":"10.1016/j.autcon.2023.105052","title":"Digitalization-based process improvement and decision-making in offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Process (computing); Tacit knowledge; Computer science; Building information modeling; Engineering; Industrial engineering; Knowledge management; Operations management","score_opus":0.005055209206338137,"score_gpt":0.23405203043466175,"score_spread":0.2289968212283236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385753057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56112057,0.0010438666,0.38121006,0.0010085797,0.00008601652,0.0002107209,0.000101025376,0.00050549605,0.05471372],"genre_scores_gemma":[0.9713897,0.00018838636,0.026678761,0.00002173644,0.0000067965775,0.000020323232,0.00003855197,0.000016548232,0.001639141],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978744,0.00097356975,0.0001111056,0.0002757974,0.0005603183,0.00020489874],"domain_scores_gemma":[0.9971495,0.0015583759,0.00026823056,0.00048239526,0.00040953126,0.00013195867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024951585,0.0004196327,0.00046718796,0.0014198892,0.000778508,0.0038599828,0.0009249433,0.0007220422,0.0026871096],"category_scores_gemma":[0.0052854135,0.00023810656,0.00037151502,0.0016515913,0.002115168,0.0025539582,0.0018885903,0.00095875113,0.0002479408],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078532717,0.0011389882,0.01341149,0.00030979412,0.000080683865,0.00022116942,0.0039006737,0.1483565,0.011668568,0.14369375,0.0013984719,0.6750346],"study_design_scores_gemma":[0.00013147831,0.0008637896,0.0343677,0.0003120423,0.00018122027,0.00026164745,0.0072916914,0.63291293,0.043158323,0.25424904,0.026142843,0.00012733486],"about_ca_topic_score_codex":0.0053757215,"about_ca_topic_score_gemma":0.0065726317,"teacher_disagreement_score":0.0053757215,"about_ca_system_score_codex":0.002211984,"about_ca_system_score_gemma":0.0021996943,"threshold_uncertainty_score":0.016049147},"labels":[],"label_agreement":null},{"id":"W4386016577","doi":"10.1016/j.autcon.2023.105054","title":"Semantic-aware quality assessment of building elements using graph neural networks","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Graph; Building information modeling; Semantics (computer science); Knowledge graph; Artificial intelligence; Artificial neural network; Enhanced Data Rates for GSM Evolution; Context (archaeology); Data mining; Point cloud; Machine learning; Theoretical computer science; Engineering","score_opus":0.05726381110989759,"score_gpt":0.33064068963499504,"score_spread":0.27337687852509746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386016577","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25795284,0.00045629943,0.737158,0.00012435013,0.000047641355,0.000072747964,0.00045608537,0.0013032858,0.0024288066],"genre_scores_gemma":[0.9328916,0.0001170147,0.06550199,0.000027128448,0.00001323404,0.000029007533,0.000612301,0.00005157333,0.000756098],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955064,0.00006614493,0.00002683924,0.00012845844,0.00018034047,0.000047640588],"domain_scores_gemma":[0.9993561,0.00018705019,0.00008579075,0.000067682704,0.00027937882,0.000024077975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005396388,0.000829747,0.00070334977,0.0020812647,0.00025053503,0.00096819125,0.0008145619,0.0007869795,0.0007629589],"category_scores_gemma":[0.0016171634,0.00030839097,0.0008103664,0.0014335813,0.0003553785,0.0011180004,0.0006596712,0.00044104183,0.00020795406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035398983,0.00021246159,0.011068521,0.00015749794,0.00020447787,0.00009286363,0.000071565635,0.66572297,0.018175581,0.0027506491,0.0013841068,0.2998053],"study_design_scores_gemma":[0.0000033094664,0.000018087994,0.0014404748,0.000005727387,0.000019835921,0.0000098129785,0.000010608821,0.99553764,0.0018868683,0.0009461074,0.00011711731,0.0000044197327],"about_ca_topic_score_codex":0.010146768,"about_ca_topic_score_gemma":0.0140123535,"teacher_disagreement_score":0.010146768,"about_ca_system_score_codex":0.0007306844,"about_ca_system_score_gemma":0.00043779888,"threshold_uncertainty_score":0.020175397},"labels":[],"label_agreement":null},{"id":"W4387419409","doi":"10.1016/j.autcon.2023.105116","title":"Specific object finding in point clouds based on semantic segmentation and iterative closest point","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Robotics and Sensor-Based Localization","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Point cloud; Artificial intelligence; Object (grammar); Computer vision; Segmentation; Matching (statistics); Computer science; Iterative closest point; Feature (linguistics); Point (geometry); Pattern recognition (psychology); Video tracking; Object detection; Point set registration; Mathematics","score_opus":0.013142632477039073,"score_gpt":0.2360951029651717,"score_spread":0.22295247048813263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387419409","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013841347,0.00010343132,0.9846548,0.000025266301,0.000017772809,0.00004843666,0.00004865105,0.0007330704,0.0005272816],"genre_scores_gemma":[0.3062556,0.0003213282,0.6913232,0.00003985343,0.00002190362,0.00010222639,0.00060943014,0.000285629,0.0010407098],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99868244,0.00015581807,0.00006267212,0.00030429562,0.0006401891,0.00015468556],"domain_scores_gemma":[0.9993026,0.00016809496,0.00009064196,0.00019352612,0.00019894626,0.000046205754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068535516,0.0011148752,0.001833367,0.0032504005,0.0011342095,0.0019384624,0.0019636997,0.0015896457,0.0014340298],"category_scores_gemma":[0.0023155382,0.0013063916,0.0020249835,0.0041299514,0.0013440844,0.0029522015,0.0022729556,0.0012314146,0.0010168585],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034144975,0.00021757832,0.002963749,0.00036234935,0.00028845566,0.0003451315,0.0006185681,0.40533426,0.070493855,0.019767389,0.0026684937,0.49659884],"study_design_scores_gemma":[0.000010921988,0.00004875989,0.00095468655,0.00002135328,0.000028286559,0.00019682871,0.00009721952,0.97022074,0.017686404,0.0093201725,0.0013801758,0.000034516634],"about_ca_topic_score_codex":0.009049182,"about_ca_topic_score_gemma":0.009935443,"teacher_disagreement_score":0.009049182,"about_ca_system_score_codex":0.0007803493,"about_ca_system_score_gemma":0.0017019868,"threshold_uncertainty_score":0.017993033},"labels":[],"label_agreement":null},{"id":"W4387734269","doi":"10.1016/j.autcon.2023.105133","title":"Dexterous manipulation of construction tools using anthropomorphic robotic hand","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"GRASP; Reinforcement learning; Imitation; Computer science; Human–computer interaction; Robot; Artificial intelligence; Automation; Control (management); Robotics; Control engineering; Engineering; Software engineering","score_opus":0.04151434564646413,"score_gpt":0.26915881422739885,"score_spread":0.2276444685809347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387734269","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38349053,0.0004080568,0.6046876,0.00020457209,0.00005523344,0.00017539831,0.0000382608,0.0009883894,0.009951942],"genre_scores_gemma":[0.96885085,0.00008224309,0.030065168,0.000023788125,0.0000046258406,0.000048250105,0.000015187217,0.000011055482,0.00089882663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997855,0.00005690203,0.000017100298,0.000050171206,0.00006625164,0.000024156096],"domain_scores_gemma":[0.9996075,0.00015278065,0.0001011426,0.00008023572,0.000026177,0.000032080046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040589538,0.00054495526,0.00030295664,0.00022031543,0.00019689361,0.00035175856,0.00044116715,0.00046725746,0.001128381],"category_scores_gemma":[0.00078522845,0.00022163332,0.0002754553,0.00009589882,0.0009777462,0.00038347254,0.0007294821,0.00027217172,0.00016921105],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022565795,0.00015215621,0.0015670817,0.00030089717,0.000049764953,0.0005839231,0.0002422887,0.6893425,0.23146151,0.0037245904,0.0003211082,0.07202853],"study_design_scores_gemma":[0.00006903251,0.0009647412,0.0039756163,0.000054127064,0.000028656641,0.0005675111,0.00007872295,0.9503177,0.035637334,0.0030332392,0.0052218316,0.000051578067],"about_ca_topic_score_codex":0.0010375764,"about_ca_topic_score_gemma":0.00090366544,"teacher_disagreement_score":0.001128381,"about_ca_system_score_codex":0.00019335673,"about_ca_system_score_gemma":0.00043510328,"threshold_uncertainty_score":0.0037748218},"labels":[],"label_agreement":null},{"id":"W4387835331","doi":"10.1016/j.autcon.2023.105125","title":"Object positional uncertainty modelling in 2D viewpoint planning","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Remote Sensing and LiDAR Applications","field":"Environmental Science","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Object (grammar); Computer science; Point (geometry); Measure (data warehouse); Data mining; Measurement uncertainty; Artificial intelligence; Mathematics; Statistics","score_opus":0.01867279939681757,"score_gpt":0.26197521893058406,"score_spread":0.2433024195337665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387835331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012459705,0.00028203867,0.986019,0.000045152272,0.00001638762,0.000016977992,0.0000867526,0.000255529,0.00081846915],"genre_scores_gemma":[0.7374533,0.0005981103,0.25889277,0.000048685437,0.000031483876,0.00007812774,0.00039251056,0.00020393917,0.002301034],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945563,0.00012696082,0.000033771714,0.00013638624,0.00019491873,0.000052326457],"domain_scores_gemma":[0.9993325,0.00040770948,0.000071076734,0.00007305478,0.00008804219,0.000027582488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006628888,0.000796843,0.00103739,0.00091765926,0.00044754468,0.0015056595,0.0011665012,0.0010382764,0.0014478058],"category_scores_gemma":[0.0023176176,0.001236653,0.0010261524,0.0014018962,0.00082868815,0.0016085499,0.0013920923,0.0007580015,0.00032887698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035842968,0.000008086259,0.000404168,0.000041678974,0.0000148460085,0.000050508,0.000047891615,0.96766996,0.000928305,0.0040514763,0.00024296471,0.026504248],"study_design_scores_gemma":[0.0000013187168,0.000007697096,0.00012968044,0.000004847235,0.0000032253504,0.000011677442,0.000005702556,0.99705124,0.00036729866,0.0021620893,0.0002507595,0.000004453561],"about_ca_topic_score_codex":0.024830176,"about_ca_topic_score_gemma":0.022272298,"teacher_disagreement_score":0.024830176,"about_ca_system_score_codex":0.0009378408,"about_ca_system_score_gemma":0.00086856884,"threshold_uncertainty_score":0.049371243},"labels":[],"label_agreement":null},{"id":"W4388177368","doi":"10.1016/j.autcon.2023.105155","title":"Automated system for high-accuracy quantity takeoff using BIM","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Concordia University","funders":"","keywords":"Takeoff; Building information modeling; Dashboard; Reliability (semiconductor); Computer science; Procurement; Reliability engineering; Track (disk drive); Quality (philosophy); Systems engineering; Engineering; Database; Automotive engineering; Power (physics)","score_opus":0.02178659303656006,"score_gpt":0.26267407209469285,"score_spread":0.2408874790581328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388177368","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0463601,0.0003112406,0.8849775,0.00022380265,0.00035401422,0.0005084773,0.0013586616,0.055150177,0.01075603],"genre_scores_gemma":[0.47268122,0.00026188898,0.51120263,0.00031929507,0.00016884129,0.0007020456,0.0028823316,0.0011953195,0.010586427],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980501,0.00023021695,0.00011750103,0.00029257708,0.0011720207,0.00013756666],"domain_scores_gemma":[0.99881846,0.00015673954,0.00008452973,0.00031226664,0.00054249814,0.0000854857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011308948,0.0013713104,0.0017553788,0.0027361847,0.001160287,0.0016444691,0.0019946822,0.0010208928,0.015722575],"category_scores_gemma":[0.0018199795,0.0007569023,0.0005217509,0.0019061283,0.00043982553,0.0014469865,0.0022762213,0.00071237306,0.00601976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013027977,0.00065369176,0.00879124,0.0005309499,0.00014695678,0.0005750724,0.0007075644,0.020735487,0.16510175,0.0071528424,0.040868152,0.7534334],"study_design_scores_gemma":[0.00040662955,0.00096508366,0.022373818,0.00018198453,0.00030114202,0.0013337282,0.00045739612,0.6414107,0.2091375,0.008305799,0.11469406,0.000432163],"about_ca_topic_score_codex":0.0019921502,"about_ca_topic_score_gemma":0.0015507516,"teacher_disagreement_score":0.015722575,"about_ca_system_score_codex":0.00049448654,"about_ca_system_score_gemma":0.0015876369,"threshold_uncertainty_score":0.052597225},"labels":[],"label_agreement":null},{"id":"W4388652948","doi":"10.1016/j.autcon.2023.105191","title":"Target-path planning and manufacturability check for robotic CLT machining operations from BIM information","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Machining; Design for manufacturability; Motion planning; Process (computing); Engineering; Robot; Manufacturing engineering; Path (computing); Engineering drawing; Industrial engineering; Computer science; Mechanical engineering; Artificial intelligence","score_opus":0.010916483307571587,"score_gpt":0.2305002408600305,"score_spread":0.2195837575524589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388652948","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.107664146,0.00007424537,0.8843983,0.000091427326,0.000013444952,0.00012138958,0.00029835288,0.0018194508,0.0055192895],"genre_scores_gemma":[0.7902697,0.00005484195,0.2066185,0.000023085568,0.0000042302236,0.00009440723,0.00061326247,0.00017559166,0.0021464133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996138,0.00006580268,0.000011670234,0.000065779204,0.00018460449,0.000058380614],"domain_scores_gemma":[0.9995216,0.0001941448,0.00006413986,0.000056096094,0.00014710113,0.000016888493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049125176,0.0007225217,0.0005390625,0.0011165997,0.0005201748,0.0006016123,0.0006968909,0.00064918323,0.0038126248],"category_scores_gemma":[0.0016750428,0.000493986,0.00053725665,0.00062460685,0.00059343915,0.00089545007,0.0010190319,0.0006055759,0.00060106575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004071141,0.00013034778,0.002517478,0.0001491557,0.000028834247,0.00020680646,0.0001529346,0.78986984,0.02301896,0.008348792,0.0016365568,0.17353313],"study_design_scores_gemma":[0.000005214769,0.00004191877,0.00073605526,0.0000046412883,0.0000036315973,0.000026792548,0.00001955905,0.9925842,0.0044735535,0.0017860015,0.00031212778,0.000006264661],"about_ca_topic_score_codex":0.010597513,"about_ca_topic_score_gemma":0.0102304695,"teacher_disagreement_score":0.010597513,"about_ca_system_score_codex":0.00071439246,"about_ca_system_score_gemma":0.001904341,"threshold_uncertainty_score":0.021071672},"labels":[],"label_agreement":null},{"id":"W4388902383","doi":"10.1016/j.autcon.2023.105164","title":"Reinforcement bond performance in 3D concrete printing: Explainable ensemble learning augmented by deep generative adversarial networks","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Research Foundation of Korea; Ministry of Science, ICT and Future Planning","keywords":"Computer science; Generative grammar; Reinforcement learning; Process (computing); Reinforcement; Artificial intelligence; 3D printing; Generative adversarial network; Machine learning; Adversarial system; Deep learning; Engineering; Structural engineering; Mechanical engineering","score_opus":0.006778418230806195,"score_gpt":0.20686241220527704,"score_spread":0.20008399397447085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388902383","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26142055,0.0006738895,0.7290331,0.0005306699,0.00013289579,0.000036399524,0.00023242336,0.002326895,0.005613248],"genre_scores_gemma":[0.9734552,0.000111577574,0.023294143,0.00008610608,0.000023184313,0.000022408281,0.00021686037,0.00011940061,0.002670955],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971205,0.00007061273,0.0000096714575,0.00008621836,0.000071091665,0.000050304057],"domain_scores_gemma":[0.99871814,0.00087124563,0.00009659849,0.00013641773,0.00010876708,0.00006889475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092264515,0.0008389322,0.00093454757,0.00044767847,0.00032572544,0.0009188627,0.0010990294,0.002228958,0.0027479173],"category_scores_gemma":[0.0023738875,0.000683502,0.0008271892,0.00040706136,0.000845475,0.0012235368,0.0013398034,0.0019705927,0.0005831684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006324035,0.000026456191,0.0003863583,0.000014427974,0.000017687556,0.00003728826,0.000017823511,0.9847009,0.0012076531,0.0010951163,0.00029033303,0.012142675],"study_design_scores_gemma":[9.4319586e-7,0.0000040174627,0.000039919338,7.1002097e-7,0.0000013886987,0.000002011159,9.730711e-7,0.9994424,0.00018489275,0.0003012056,0.000020117568,0.0000013675954],"about_ca_topic_score_codex":0.0068514924,"about_ca_topic_score_gemma":0.006453552,"teacher_disagreement_score":0.0068514924,"about_ca_system_score_codex":0.0006962767,"about_ca_system_score_gemma":0.00062587735,"threshold_uncertainty_score":0.013623238},"labels":[],"label_agreement":null},{"id":"W4389263170","doi":"10.1016/j.autcon.2023.105218","title":"Enhanced model tree for quantifying output variances due to random data sampling: Productivity prediction applications","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Modeling, Simulation, and Optimization","field":"Mathematics","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Productivity; Variance (accounting); Tree (set theory); Computer science; Sampling (signal processing); Productivity model; Sample (material); Data mining; Econometrics; Artificial intelligence; Industrial engineering; Machine learning; Engineering; Mathematics; Total factor productivity","score_opus":0.237421357862477,"score_gpt":0.39600615927180705,"score_spread":0.15858480140933004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389263170","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013919291,0.000070786955,0.9850007,0.000047345697,0.000011346842,0.000017365977,0.00022887668,0.00030397295,0.0004002716],"genre_scores_gemma":[0.6233866,0.00025295597,0.37226003,0.00011632606,0.000072566254,0.00019768433,0.0013057915,0.00026492332,0.0021432173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981573,0.00070867507,0.00008939423,0.0003608863,0.00054536754,0.00013844486],"domain_scores_gemma":[0.9895236,0.006956121,0.0008638303,0.0012779861,0.001189993,0.00018854118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046136654,0.0007765671,0.0012089913,0.0014686792,0.0004375229,0.0012586742,0.0015838192,0.0014420404,0.0020492978],"category_scores_gemma":[0.016909784,0.00046339844,0.0010843007,0.002145483,0.0005134441,0.0020833227,0.001031112,0.0012474189,0.00043429318],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011347156,0.000073741576,0.0035818897,0.000051662624,0.00007339674,0.00005966077,0.000044611083,0.9373381,0.0023844573,0.01715621,0.0006726963,0.038450055],"study_design_scores_gemma":[0.000002748248,0.000010032619,0.0003349843,0.0000030507026,0.0000058780392,0.000010624363,0.0000018076055,0.9945233,0.0002972021,0.0046796585,0.00012676741,0.000004002229],"about_ca_topic_score_codex":0.0054025888,"about_ca_topic_score_gemma":0.00508326,"teacher_disagreement_score":0.0054025888,"about_ca_system_score_codex":0.0010311351,"about_ca_system_score_gemma":0.0013783186,"threshold_uncertainty_score":0.024399698},"labels":[],"label_agreement":null},{"id":"W4389285739","doi":"10.1016/j.autcon.2023.105208","title":"Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Computer science; Resource allocation; Track (disk drive); Operations research; Resource (disambiguation); Industrial engineering; Engineering; Operations management","score_opus":0.12224588919194798,"score_gpt":0.3739379494972018,"score_spread":0.2516920603052538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389285739","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033403233,0.0005867766,0.9605542,0.00018626597,0.00008235666,0.00012688506,0.00020398851,0.00033769544,0.004518752],"genre_scores_gemma":[0.78527033,0.00046409506,0.20999505,0.000090395595,0.00006554686,0.00029931983,0.00038052286,0.00013566285,0.003299018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855036,0.0006042243,0.000044916334,0.00018748295,0.0002626517,0.0003504681],"domain_scores_gemma":[0.9990023,0.00059024716,0.00010122819,0.000041110074,0.0001730921,0.00009216923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022653297,0.0010876507,0.0023374087,0.001148808,0.00064122234,0.0019266272,0.0020433443,0.001117635,0.0035461613],"category_scores_gemma":[0.0022444937,0.00088255794,0.00087617285,0.001885077,0.0006817573,0.00093089056,0.0009558649,0.0012867864,0.00034341146],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041331572,0.000026539405,0.00007704608,0.000025692792,0.000015435411,0.000013611547,0.000010169389,0.99060845,0.0002566288,0.002973255,0.00031832696,0.005633475],"study_design_scores_gemma":[0.000008753576,0.000012208548,0.00004029895,0.00000219362,0.0000043370883,0.0000019710983,0.0000038162116,0.9985928,0.000054859123,0.0011348953,0.00014172803,0.000002068526],"about_ca_topic_score_codex":0.022613222,"about_ca_topic_score_gemma":0.0203001,"teacher_disagreement_score":0.022613222,"about_ca_system_score_codex":0.0021448224,"about_ca_system_score_gemma":0.004185154,"threshold_uncertainty_score":0.04496318},"labels":[],"label_agreement":null},{"id":"W4389380616","doi":"10.1016/j.autcon.2023.105228","title":"Simulation-based comparison of push- and pull-based planning in panelized construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Association for Canadian and Québec Literatures; University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Factory (object-oriented programming); Discrete event simulation; Engineering; Reduction (mathematics); Construction management; Event (particle physics); Computer science; Construction engineering; Systems engineering; Operations research; Simulation; Civil engineering","score_opus":0.023004955165500683,"score_gpt":0.2858671143505609,"score_spread":0.26286215918506023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389380616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93762904,0.0001047489,0.046179384,0.00009975107,0.000038567614,0.00010940884,0.00067029346,0.00066879357,0.0145],"genre_scores_gemma":[0.99450654,0.000031141815,0.0047020814,0.0000052155883,9.4070265e-7,0.000028837474,0.0001893277,0.000023955354,0.0005119695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963903,0.00014753373,0.000019386978,0.00004580042,0.00008446817,0.00006375883],"domain_scores_gemma":[0.99766266,0.0017669022,0.00007250228,0.00014292327,0.00026284953,0.000092111666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069549517,0.00046375152,0.00069244864,0.0006000123,0.0003902925,0.0010329024,0.0009282097,0.0010002198,0.0058183456],"category_scores_gemma":[0.0020631147,0.00043603085,0.00049627264,0.00085192226,0.00047144413,0.0005809388,0.00050701614,0.00059048354,0.00038434504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022007576,0.000120632045,0.0008599096,0.000024788738,0.000012222122,0.000021560338,0.00003738197,0.9935859,0.0005857177,0.0005608788,0.00013055606,0.0038404502],"study_design_scores_gemma":[0.00001692961,0.00006890251,0.0005878237,0.0000041219896,0.0000073341266,0.0000040215455,0.000032261876,0.9982955,0.0006445316,0.0002018103,0.00012933915,0.0000074181307],"about_ca_topic_score_codex":0.03548301,"about_ca_topic_score_gemma":0.028045652,"teacher_disagreement_score":0.03548301,"about_ca_system_score_codex":0.0010696555,"about_ca_system_score_gemma":0.0014097616,"threshold_uncertainty_score":0.070552945},"labels":[],"label_agreement":null},{"id":"W4389503415","doi":"10.1016/j.autcon.2023.105213","title":"Crack detection of masonry structure based on thermal and visible image fusion and semantic segmentation","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Segmentation; Artificial intelligence; Computer science; Concatenation (mathematics); Computer vision; Masonry; Pixel; Image segmentation; Modality (human–computer interaction); Pattern recognition (psychology); Transfer of learning; Structural engineering; Engineering; Mathematics","score_opus":0.003798492382875494,"score_gpt":0.2109515262611458,"score_spread":0.2071530338782703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389503415","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51280075,0.00058427354,0.48076457,0.00010472502,0.00006930858,0.00006946137,0.00033853462,0.0011681016,0.004100283],"genre_scores_gemma":[0.91756374,0.00021719567,0.08033556,0.000029406576,0.000030154302,0.00002539375,0.00047910956,0.00005335507,0.0012660717],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997423,0.000018481169,0.000009874405,0.00006815309,0.000105459156,0.0000556088],"domain_scores_gemma":[0.99979347,0.000025986274,0.000035488618,0.000032149503,0.00009428561,0.000018667139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023010421,0.00046583478,0.00051846233,0.0021447346,0.00022442943,0.00060290896,0.00040637955,0.0007435477,0.000900493],"category_scores_gemma":[0.00043712414,0.00029290805,0.0006440431,0.0009239268,0.0003681456,0.00088586105,0.00051931746,0.0004163107,0.00041273297],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005910482,0.00028390167,0.018887637,0.00029119823,0.00013389275,0.0002594099,0.0002793547,0.028752092,0.60960525,0.0024058337,0.0019750632,0.33653533],"study_design_scores_gemma":[0.000021722626,0.00017757202,0.06959813,0.00004273205,0.00015726173,0.0004640213,0.00019724606,0.8295352,0.0954711,0.0023538796,0.0019240686,0.00005716833],"about_ca_topic_score_codex":0.0015060488,"about_ca_topic_score_gemma":0.002871553,"teacher_disagreement_score":0.0021447346,"about_ca_system_score_codex":0.00016715776,"about_ca_system_score_gemma":0.0003617533,"threshold_uncertainty_score":0.0030124784},"labels":[],"label_agreement":null},{"id":"W4389637870","doi":"10.1016/j.autcon.2023.105237","title":"Reinforcement layout design for deep beams based on bi-objective topology optimization","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Topology Optimization in Engineering","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Science Foundation of Hunan Province; National Natural Science Foundation of China","keywords":"Topology optimization; Reinforcement; Rebar; Structural engineering; Lexicographical order; Tension (geology); Computer science; Topology (electrical circuits); Optimal design; Compression (physics); Stability (learning theory); Mathematical optimization; Engineering; Mathematics; Materials science; Finite element method; Composite material","score_opus":0.011165371765916782,"score_gpt":0.23190195460237806,"score_spread":0.22073658283646128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389637870","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030012256,0.00010580017,0.96731156,0.000053046566,0.000012899809,0.00003231345,0.000021684338,0.00014842613,0.0023020676],"genre_scores_gemma":[0.46642816,0.00017107691,0.53007984,0.000072938885,0.00001321286,0.0002260122,0.000111456786,0.00012132072,0.0027759138],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984896,0.00004842779,0.000005986936,0.000026625672,0.000050531326,0.000019469655],"domain_scores_gemma":[0.9997925,0.00009344524,0.000031157873,0.000015703063,0.0000491898,0.000018037506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044023115,0.00068584655,0.0006277544,0.0006571283,0.0002054464,0.00039570528,0.0005904351,0.0005612725,0.001790449],"category_scores_gemma":[0.00065583695,0.00037574852,0.00037414144,0.00038407068,0.00034826493,0.0005730901,0.0006406057,0.0004480791,0.00029885775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021764252,0.0000336152,0.0006097094,0.00006384029,0.000025059966,0.000044997858,0.00003065189,0.9384991,0.009798712,0.0048485175,0.00040750403,0.045616545],"study_design_scores_gemma":[0.0000062845265,0.000029295063,0.000087777844,0.0000029030502,0.00000387147,0.000014392175,0.00000799239,0.99795437,0.00055622356,0.0009708041,0.0003634951,0.0000026101816],"about_ca_topic_score_codex":0.00096302974,"about_ca_topic_score_gemma":0.0017539257,"teacher_disagreement_score":0.001790449,"about_ca_system_score_codex":0.00030561513,"about_ca_system_score_gemma":0.0005559511,"threshold_uncertainty_score":0.005989611},"labels":[],"label_agreement":null},{"id":"W4392611940","doi":"10.1016/j.autcon.2024.105328","title":"Deep learning-based structural health monitoring","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":332,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Structural health monitoring; Deep learning; Computer science; Artificial intelligence; Engineering; Data science; Construction engineering; Structural engineering","score_opus":0.0056799213124339555,"score_gpt":0.24557025725472115,"score_spread":0.2398903359422872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392611940","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017000375,0.02180629,0.9515812,0.0008582102,0.00021743696,0.00005225474,0.00068463734,0.0012780735,0.006521514],"genre_scores_gemma":[0.7206259,0.037335876,0.22348373,0.0009923782,0.00056858937,0.00019434419,0.0027035698,0.00016941014,0.013926173],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997683,0.000039252125,0.000020880272,0.000058228652,0.00008461681,0.000028712264],"domain_scores_gemma":[0.99968326,0.00013369534,0.000043973785,0.0000223487,0.00009925318,0.000017426646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054925034,0.0008364051,0.00076378963,0.0010059865,0.00013756003,0.0007691375,0.0010047824,0.00067818176,0.0015901482],"category_scores_gemma":[0.0012648122,0.00027412045,0.0005438334,0.00080860045,0.00028375158,0.0009519749,0.0007246348,0.0007721224,0.0005380192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008119647,0.000108237226,0.004282362,0.0009013427,0.00015847634,0.00010980687,0.000079152036,0.25176683,0.0068541486,0.0076099373,0.007628263,0.7204203],"study_design_scores_gemma":[0.0000059475874,0.000058084133,0.0017832436,0.000141641,0.000049771857,0.00008170485,0.00002728412,0.9788094,0.0039657317,0.007324227,0.0077342293,0.000018841554],"about_ca_topic_score_codex":0.00292042,"about_ca_topic_score_gemma":0.0036296851,"teacher_disagreement_score":0.00292042,"about_ca_system_score_codex":0.0005543713,"about_ca_system_score_gemma":0.00053305354,"threshold_uncertainty_score":0.005806923},"labels":[],"label_agreement":null},{"id":"W4393220625","doi":"10.1016/j.autcon.2024.105389","title":"Vision-based real-time process monitoring and problem feedback for productivity-oriented analysis in off-site construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Postdoctoral Science Foundation","keywords":"Productivity; Process (computing); Computer science; Engineering; Industrial engineering; Real-time computing; Economics; Operating system","score_opus":0.004545355074329525,"score_gpt":0.2406561567034245,"score_spread":0.23611080162909498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393220625","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25240645,0.00029400148,0.73944235,0.00011797437,0.00007225803,0.000098956225,0.00015113332,0.003888759,0.003528087],"genre_scores_gemma":[0.89757675,0.00008506079,0.10115728,0.000035897192,0.00001266959,0.000046344234,0.00014241606,0.000088618006,0.0008549304],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947745,0.00009504935,0.00001965274,0.00012479331,0.00020714272,0.000075910946],"domain_scores_gemma":[0.99933594,0.00019878734,0.00009510036,0.00007277238,0.00021616038,0.00008133597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005579237,0.000573478,0.0007953365,0.0014779634,0.0002456581,0.00087136234,0.00085472455,0.00068839383,0.0018489038],"category_scores_gemma":[0.0014747258,0.00032388547,0.00037570836,0.0006780742,0.00030918288,0.0007745292,0.0009599677,0.0005739311,0.00043145093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011917551,0.0011458187,0.0063539236,0.00026067274,0.000079738595,0.00016937777,0.00037371676,0.08311334,0.17536889,0.0012442895,0.0033499945,0.7273485],"study_design_scores_gemma":[0.00002719354,0.00018933717,0.0071027987,0.000009623701,0.000021066071,0.000072944975,0.00009377912,0.9670029,0.024044957,0.00079126103,0.00062256586,0.00002163184],"about_ca_topic_score_codex":0.0031937214,"about_ca_topic_score_gemma":0.0039199255,"teacher_disagreement_score":0.0031937214,"about_ca_system_score_codex":0.00040629198,"about_ca_system_score_gemma":0.00074083346,"threshold_uncertainty_score":0.006350279},"labels":[],"label_agreement":null},{"id":"W4394804427","doi":"10.1016/j.autcon.2024.105418","title":"Computer vision in drone imagery for infrastructure management","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Remote Sensing and LiDAR Applications","field":"Environmental Science","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Drone; Computer vision; Computer science; Artificial intelligence; Engineering","score_opus":0.0037614149512011194,"score_gpt":0.2398834397051187,"score_spread":0.23612202475391758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394804427","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006055558,0.9808425,0.0017442759,0.0012699188,0.0004687868,0.00017950487,0.0007683969,0.000021114114,0.008650123],"genre_scores_gemma":[0.12576203,0.8643139,0.0059651784,0.0012526669,0.00062818034,0.0003497294,0.00060098973,0.000029267014,0.0010980816],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9911951,0.004630753,0.0016520387,0.0008360484,0.0014803548,0.00020580209],"domain_scores_gemma":[0.928931,0.057582464,0.006171553,0.0016819875,0.005292116,0.0003408296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012598002,0.0007498612,0.001468147,0.013216104,0.00047377642,0.0048083286,0.00096574845,0.001370229,0.009137079],"category_scores_gemma":[0.04577856,0.00044247147,0.0033151568,0.00942036,0.0010880091,0.002996193,0.0013975957,0.001282576,0.00096049294],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046964502,0.00013510743,0.011428263,0.35233265,0.007921086,0.00020821956,0.0013207413,0.0006929521,0.0011483365,0.009558508,0.0071730455,0.6076115],"study_design_scores_gemma":[0.0002389261,0.0014939598,0.07974807,0.513611,0.028510094,0.0015667304,0.0063565057,0.0011996849,0.003911626,0.011981208,0.35122898,0.0001532248],"about_ca_topic_score_codex":0.006389492,"about_ca_topic_score_gemma":0.011236129,"teacher_disagreement_score":0.013216104,"about_ca_system_score_codex":0.002532301,"about_ca_system_score_gemma":0.0039560706,"threshold_uncertainty_score":0.06662542},"labels":[],"label_agreement":null},{"id":"W4394946647","doi":"10.1016/j.autcon.2024.105422","title":"Construction metaverse: Application framework and adoption barriers","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Virtual Reality Applications and Impacts","field":"Computer Science","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Metaverse; Computer science; Human–computer interaction; Knowledge management; Engineering; Business; Virtual reality","score_opus":0.008577527054321294,"score_gpt":0.265597742091219,"score_spread":0.2570202150368977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394946647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82203376,0.00070660806,0.07602115,0.0049762763,0.000066645196,0.0005848232,0.00059444905,0.0023677323,0.09264854],"genre_scores_gemma":[0.9745422,0.00024172531,0.02107057,0.00025274104,0.000015415419,0.00022548712,0.0005825906,0.00039975732,0.0026694573],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9856586,0.0061840336,0.0010188614,0.0011659755,0.0042909477,0.0016816361],"domain_scores_gemma":[0.92946434,0.04550982,0.004223514,0.009754133,0.008430259,0.0026179664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025281183,0.00057387556,0.00049149105,0.0046951757,0.0021331364,0.014955688,0.0029793936,0.0026941923,0.00856831],"category_scores_gemma":[0.07354674,0.0007802295,0.00068810716,0.005045089,0.0028399308,0.01611716,0.010355757,0.0029745179,0.0012060468],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014684452,0.0022645914,0.23178963,0.0014049126,0.00011890973,0.0008094955,0.06162481,0.0044022044,0.01193327,0.32991,0.009219061,0.34505457],"study_design_scores_gemma":[0.00024741396,0.0027224948,0.30330786,0.003908594,0.00046531437,0.003513349,0.15369934,0.084951565,0.02550963,0.14018081,0.28100604,0.00048762764],"about_ca_topic_score_codex":0.012444536,"about_ca_topic_score_gemma":0.010383737,"teacher_disagreement_score":0.025281183,"about_ca_system_score_codex":0.0053036683,"about_ca_system_score_gemma":0.011253477,"threshold_uncertainty_score":0.13370126},"labels":[],"label_agreement":null},{"id":"W4396631885","doi":"10.1016/j.autcon.2024.105450","title":"Employing simulation to assess value alignment and fulfillment within construction project settings and team dynamics","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Value (mathematics); Dynamics (music); Engineering; Computer science; Engineering management; Systems engineering; Process management; Operations management; Industrial engineering; Operations research; Psychology","score_opus":0.06667093756595338,"score_gpt":0.38580631707217367,"score_spread":0.3191353795062203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396631885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934662,0.0000089271525,0.004958279,0.00003425752,0.0000037176449,0.000038227958,0.000027411632,0.000019450312,0.0014435964],"genre_scores_gemma":[0.9976593,0.000007961314,0.0021004463,0.000004302407,7.419914e-7,0.000038742495,0.000030685183,0.0000023618338,0.0001553965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989329,0.0006917567,0.000047650527,0.00007914622,0.00011783837,0.00013061406],"domain_scores_gemma":[0.9855693,0.012287382,0.00069277117,0.0004465519,0.0005444641,0.0004596447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021246509,0.000404451,0.00035589738,0.0006033185,0.00062402524,0.0016833416,0.0005904611,0.0010495451,0.0012937328],"category_scores_gemma":[0.012439802,0.00028602523,0.00035470133,0.00075264997,0.00068334996,0.0008379335,0.00095076807,0.0007144922,0.00012180746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014137756,0.0015871528,0.078407206,0.000065946304,0.00013382027,0.00014044106,0.0015632454,0.89563817,0.0024743502,0.0056588366,0.00027386117,0.012643103],"study_design_scores_gemma":[0.000054605083,0.0004643876,0.008976801,0.000011033302,0.000018195351,0.000019632498,0.0006488832,0.98674333,0.00079349184,0.0020304401,0.000223661,0.000015502868],"about_ca_topic_score_codex":0.013090465,"about_ca_topic_score_gemma":0.010958435,"teacher_disagreement_score":0.013090465,"about_ca_system_score_codex":0.0017465011,"about_ca_system_score_gemma":0.0021443416,"threshold_uncertainty_score":0.026028514},"labels":[],"label_agreement":null},{"id":"W4396767426","doi":"10.1016/j.autcon.2024.105458","title":"Data-driven automatic classification model for construction accident cases using natural language processing with hyperparameter tuning","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":29,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Institute for Advancement of Technology; Ministry of Trade, Industry and Energy","keywords":"Hyperparameter; Accident (philosophy); Computer science; Artificial intelligence; Machine learning; Natural language processing; Data mining","score_opus":0.2022277656843931,"score_gpt":0.4993653301654243,"score_spread":0.2971375644810312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396767426","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16991873,0.0004134377,0.8068799,0.00063778966,0.00017944995,0.00040615993,0.003337406,0.016156446,0.0020706512],"genre_scores_gemma":[0.7909967,0.00013053062,0.19666614,0.00018684902,0.000059894155,0.0007009395,0.0079392735,0.0002796378,0.003040145],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993185,0.00009796225,0.000070492235,0.00031695637,0.00010993592,0.00008613314],"domain_scores_gemma":[0.998659,0.0006431794,0.00008620035,0.00011483229,0.0004563779,0.000040289015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092315295,0.0011604975,0.0007276814,0.0014322257,0.0004436632,0.001230728,0.0015396696,0.001112716,0.00269726],"category_scores_gemma":[0.0032178406,0.000489309,0.0013080606,0.0007033123,0.00028983073,0.0010436754,0.00076169986,0.0014518574,0.0017784922],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00082880206,0.00089104194,0.010302266,0.00023694737,0.00020566817,0.00076123327,0.00021020218,0.4667465,0.025362032,0.0019283142,0.013201556,0.47932547],"study_design_scores_gemma":[0.000008408576,0.000014317336,0.00045823975,0.000005850582,0.000015299136,0.000024839721,0.000013974889,0.996222,0.002156728,0.0007409006,0.00033320868,0.000006285708],"about_ca_topic_score_codex":0.0113615375,"about_ca_topic_score_gemma":0.010463856,"teacher_disagreement_score":0.0113615375,"about_ca_system_score_codex":0.0012578071,"about_ca_system_score_gemma":0.0011782853,"threshold_uncertainty_score":0.022590816},"labels":[],"label_agreement":null},{"id":"W4399469452","doi":"10.1016/j.autcon.2024.105486","title":"Multiscale object detection on complex architectural floor plans","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Video Surveillance and Tracking Methods","field":"Computer Science","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Mitacs","keywords":"Computer science; Object (grammar); Artificial intelligence; Engineering drawing; Computer vision; Engineering","score_opus":0.024501582330263796,"score_gpt":0.29937838099873676,"score_spread":0.274876798668473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399469452","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6352445,0.00068014616,0.3563294,0.00013218913,0.00005801799,0.000075238546,0.00045804793,0.0027583062,0.004264227],"genre_scores_gemma":[0.9294884,0.00026293955,0.06785614,0.000047573863,0.000016762162,0.000014521156,0.00070197927,0.00006390564,0.0015478705],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978155,0.000021333193,0.000006859778,0.00006622005,0.00007639317,0.000047615886],"domain_scores_gemma":[0.99985886,0.00003234965,0.000022278055,0.00002483496,0.000042261607,0.000019302348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026190176,0.0004933524,0.00041506765,0.0014303521,0.0001906006,0.0004803483,0.00040262454,0.00027631197,0.00094828196],"category_scores_gemma":[0.0005090233,0.00024145232,0.0004381947,0.00061741186,0.0002965446,0.00046666258,0.0006239928,0.00025580855,0.00024436417],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043976257,0.000103448445,0.014151153,0.00020353188,0.00014884023,0.0007263706,0.00023440532,0.13317278,0.23941195,0.0031097934,0.0049989135,0.6032991],"study_design_scores_gemma":[0.0000078631865,0.000057190435,0.026176449,0.000016481576,0.000042575204,0.00022021022,0.00008205302,0.9375704,0.032672595,0.0012103313,0.0019270338,0.000016821927],"about_ca_topic_score_codex":0.0075859306,"about_ca_topic_score_gemma":0.01361823,"teacher_disagreement_score":0.0075859306,"about_ca_system_score_codex":0.0003449094,"about_ca_system_score_gemma":0.0003890234,"threshold_uncertainty_score":0.015083551},"labels":[],"label_agreement":null},{"id":"W4399714490","doi":"10.1016/j.autcon.2024.105503","title":"Distributed collaborative inspections through smart infrastructure metaverse","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Mobile Crowdsensing and Crowdsourcing","field":"Computer Science","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Metaverse; Computer science; Engineering; Computer security; Human–computer interaction; Virtual reality","score_opus":0.006515064956452836,"score_gpt":0.2422702472407563,"score_spread":0.23575518228430345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399714490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18160653,0.00041646324,0.79607713,0.0005150544,0.00018371452,0.00020183907,0.0002585523,0.0054990295,0.015241749],"genre_scores_gemma":[0.9177313,0.000090794274,0.07607547,0.00006937983,0.000037314952,0.00008278518,0.00018575984,0.00014188717,0.005585299],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983321,0.00035087383,0.00006551142,0.000409448,0.0005855107,0.00025656784],"domain_scores_gemma":[0.99732023,0.000842307,0.00020799061,0.0010776347,0.00030557337,0.00024635298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016965299,0.00081971526,0.0014927542,0.001567629,0.0018555411,0.0027480351,0.0023986697,0.0021423653,0.0050910385],"category_scores_gemma":[0.0036287543,0.00084311096,0.000979457,0.0018643005,0.0012542199,0.0030110462,0.0068251803,0.001134243,0.0011488026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019601372,0.00075265236,0.008616119,0.0003388852,0.0003670198,0.0015956364,0.0032128377,0.5280035,0.085814156,0.05030772,0.009646984,0.30938444],"study_design_scores_gemma":[0.000053630047,0.00015760853,0.0016054201,0.000023072487,0.000046347082,0.00010698687,0.00056618,0.9528779,0.010535342,0.025741959,0.008235341,0.000050338167],"about_ca_topic_score_codex":0.0046414495,"about_ca_topic_score_gemma":0.0060480176,"teacher_disagreement_score":0.0050910385,"about_ca_system_score_codex":0.000875844,"about_ca_system_score_gemma":0.0014225967,"threshold_uncertainty_score":0.017031252},"labels":[],"label_agreement":null},{"id":"W4399722057","doi":"10.1016/j.autcon.2024.105541","title":"Agent-based post-earthquake evacuation simulation to enhance early-stage architectural layout and non-structural design","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Evacuation and Crowd Dynamics","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Architectural design; Engineering; Stage (stratigraphy); Computer science; Construction engineering; Earthquake simulation; Engineering drawing; Civil engineering; Architecture; Geology; Geography","score_opus":0.009531273000989125,"score_gpt":0.2741252604731933,"score_spread":0.2645939874722042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399722057","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2608473,0.000095808304,0.72442234,0.00017136046,0.00005163854,0.0003079988,0.0002181035,0.0020225048,0.011862867],"genre_scores_gemma":[0.7519261,0.000089230765,0.24435236,0.00003048873,0.0000052273654,0.00021156493,0.00017506644,0.00008823225,0.0031217525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99983,0.00008262993,0.000008996529,0.000019044326,0.000045834557,0.000013412052],"domain_scores_gemma":[0.99913675,0.00059149164,0.00006126541,0.000066353656,0.000103173574,0.000041083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055947143,0.0005672957,0.00035796184,0.00029439805,0.0002756476,0.0006273181,0.0006857357,0.0005487844,0.0033155412],"category_scores_gemma":[0.001391906,0.00031080365,0.00037301212,0.0001578424,0.0002640326,0.00036816593,0.00059192465,0.00046044542,0.00024437023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007645704,0.00012875348,0.0010000363,0.0000573468,0.000020512749,0.0000660804,0.000196253,0.9794948,0.004701099,0.0029391174,0.0003162408,0.011003369],"study_design_scores_gemma":[0.000018062896,0.0000337761,0.00016431052,0.0000048206252,0.000006457566,0.000007731717,0.000021529018,0.9971396,0.0010442699,0.00054064597,0.0010150326,0.0000038161097],"about_ca_topic_score_codex":0.0044647837,"about_ca_topic_score_gemma":0.008186148,"teacher_disagreement_score":0.0044647837,"about_ca_system_score_codex":0.00046359195,"about_ca_system_score_gemma":0.00075557013,"threshold_uncertainty_score":0.01109159},"labels":[],"label_agreement":null},{"id":"W4399783981","doi":"10.1016/j.autcon.2024.105511","title":"Automating adaptive scan planning for static laser scanning in complex 3D environments","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Robotics and Sensor-Based Localization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Laser scanning; Computer science; 3d scanning; Laser; Engineering; Computer vision; Optics; Physics","score_opus":0.02269997621494534,"score_gpt":0.25555372949606336,"score_spread":0.23285375328111801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399783981","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009880824,0.000039199887,0.98827296,0.000017366963,0.0000058670576,0.00003872299,0.00002896583,0.0008837977,0.00083224365],"genre_scores_gemma":[0.21517774,0.00009564249,0.78322667,0.000019331235,0.000007826541,0.00009382714,0.0001669311,0.00039278413,0.0008192678],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992518,0.0001496495,0.000029469671,0.00016792506,0.00034047986,0.000060720253],"domain_scores_gemma":[0.9989812,0.000441461,0.000110096655,0.00025163454,0.00017576876,0.000039904302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005504875,0.000811328,0.0005230443,0.0010802803,0.00064035814,0.00086408644,0.0011793482,0.0006125243,0.002198832],"category_scores_gemma":[0.0016827512,0.0006093099,0.0006721049,0.00076887745,0.0006621485,0.0007959491,0.0010882502,0.0005652038,0.0007615591],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014826398,0.00008924793,0.00422847,0.00022080253,0.00008455693,0.00022926199,0.00049522903,0.4342478,0.084765874,0.0069711595,0.0021033878,0.46641594],"study_design_scores_gemma":[0.000012582763,0.000081671446,0.0014947482,0.00002063688,0.0000227325,0.00024515935,0.00015508202,0.966507,0.022004114,0.0046766177,0.0047453847,0.00003433605],"about_ca_topic_score_codex":0.00511296,"about_ca_topic_score_gemma":0.0153322695,"teacher_disagreement_score":0.00511296,"about_ca_system_score_codex":0.00055208936,"about_ca_system_score_gemma":0.0014592,"threshold_uncertainty_score":0.010166347},"labels":[],"label_agreement":null},{"id":"W4400574936","doi":"10.1016/j.autcon.2024.105602","title":"Proactive safety hazard identification using visual–text semantic similarity for construction safety management","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":34,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"China Scholarship Council; Hong Kong Polytechnic University","keywords":"Hazard analysis; Identification (biology); Hazard; Construction site safety; Similarity (geometry); Computer science; Semantic similarity; System safety; Natural language processing; Engineering; Information retrieval; Artificial intelligence; Reliability engineering; Image (mathematics); Structural engineering","score_opus":0.06735273102449192,"score_gpt":0.46935179305589697,"score_spread":0.40199906203140506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400574936","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43149993,0.0014505651,0.5425911,0.0005023809,0.00032135512,0.0007734658,0.0031473127,0.006167792,0.013546166],"genre_scores_gemma":[0.8849886,0.00019646688,0.1101104,0.00008663761,0.00007351351,0.00014018377,0.0027013258,0.00009845586,0.0016043979],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876946,0.00021615945,0.00014698454,0.00028859556,0.0004672663,0.00011136732],"domain_scores_gemma":[0.9980344,0.00054251467,0.00032104715,0.00020570053,0.00078999624,0.00010638639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007776816,0.00050030986,0.000440279,0.005079955,0.0005673684,0.0010442054,0.0006194049,0.000668144,0.002225783],"category_scores_gemma":[0.0034129722,0.00014233492,0.0006961756,0.0023504125,0.00031075507,0.002328407,0.0013686899,0.0004026514,0.0009243015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014249522,0.0014422132,0.029209279,0.0013365821,0.00027346483,0.00045569538,0.0011482323,0.011664985,0.09653472,0.009036077,0.012075993,0.8353979],"study_design_scores_gemma":[0.00018290752,0.001588406,0.09585562,0.0003477618,0.00066272356,0.0013686506,0.0045093964,0.70772684,0.11038314,0.04320768,0.033922695,0.0002442797],"about_ca_topic_score_codex":0.0029452005,"about_ca_topic_score_gemma":0.0032320959,"teacher_disagreement_score":0.005079955,"about_ca_system_score_codex":0.00048463055,"about_ca_system_score_gemma":0.0010172476,"threshold_uncertainty_score":0.007445991},"labels":[],"label_agreement":null},{"id":"W4400620457","doi":"10.1016/j.autcon.2024.105608","title":"Effect of human emotional responses on human-robot team pty in construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Hudbay Minerals (Canada); University of Toronto","funders":"National Science Foundation","keywords":"Robot; Human–robot interaction; Computer science; Human–computer interaction; Psychology; Applied psychology; Engineering; Social psychology; Artificial intelligence","score_opus":0.07950960012246924,"score_gpt":0.5200543550678303,"score_spread":0.44054475494536105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400620457","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99812895,0.000025235731,0.00037805887,0.00003289427,0.000027215696,0.000015415411,0.000016530154,0.000011393809,0.0013642926],"genre_scores_gemma":[0.9987935,0.000017620603,0.00017705883,0.000033988483,0.000007951239,0.00003329735,0.000021579684,0.0000070404117,0.0009080199],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99868363,0.00073343,0.00005801717,0.000135918,0.00016352351,0.00022547528],"domain_scores_gemma":[0.9946785,0.003219448,0.00056588836,0.000317487,0.00039515077,0.00082360225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009706416,0.00044682407,0.00025461407,0.00020054053,0.0007212503,0.00097302307,0.0002651676,0.0006423062,0.0050162114],"category_scores_gemma":[0.010802815,0.00019338496,0.00026542405,0.00013255984,0.0007372958,0.0003376593,0.0012170537,0.00061709416,0.0004835766],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.10062599,0.011097309,0.26240474,0.0012536151,0.00083563896,0.0035154985,0.042846404,0.025525661,0.41967934,0.002090054,0.0043348595,0.1257909],"study_design_scores_gemma":[0.0005103361,0.018081035,0.91989076,0.00010040358,0.00025248944,0.00040765997,0.01740737,0.011498348,0.027292954,0.001237438,0.003199821,0.000121451965],"about_ca_topic_score_codex":0.0010983376,"about_ca_topic_score_gemma":0.0012342234,"teacher_disagreement_score":0.0050162114,"about_ca_system_score_codex":0.0003980677,"about_ca_system_score_gemma":0.00034253567,"threshold_uncertainty_score":0.016780913},"labels":[],"label_agreement":null},{"id":"W4401282697","doi":"10.1016/j.autcon.2024.105647","title":"Virtual simulation environment for comparing and testing current modeling strategies in project planning and control","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Computer science; Schedule; Domain (mathematical analysis); Control (management); Systems engineering; Resource (disambiguation); Virtual machine; Markov chain; Operations research; Industrial engineering; Engineering; Machine learning; Artificial intelligence","score_opus":0.18487056802356963,"score_gpt":0.41831981777690835,"score_spread":0.23344924975333872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401282697","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10760735,0.00023058313,0.86814326,0.00042016746,0.00014820207,0.0005068424,0.0007799742,0.0017115291,0.020452082],"genre_scores_gemma":[0.687142,0.00030830884,0.30925614,0.00007094018,0.000028432214,0.0012675083,0.0005855734,0.00021144355,0.001129589],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997347,0.001986308,0.000098648714,0.00012697588,0.00031051665,0.00013049951],"domain_scores_gemma":[0.9893063,0.008937943,0.0003061457,0.0008444284,0.00038833058,0.00021687936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046116533,0.00071275054,0.00058181456,0.0009991195,0.0007075884,0.0014299693,0.0015619165,0.00077634805,0.0033766606],"category_scores_gemma":[0.009675689,0.00035686872,0.00058972207,0.00090943417,0.0011017129,0.0014952254,0.0016244821,0.0011540706,0.0002759834],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021886936,0.00026832015,0.0017396657,0.0000885856,0.000050397546,0.00006532304,0.00016946398,0.9233822,0.0014216257,0.05518805,0.0009912705,0.016416254],"study_design_scores_gemma":[0.00012695225,0.00027160303,0.00037971602,0.00003521785,0.000022945515,0.000023845318,0.000107797554,0.9764199,0.0020281922,0.014234443,0.0063234842,0.000025872348],"about_ca_topic_score_codex":0.0034257618,"about_ca_topic_score_gemma":0.0032800974,"teacher_disagreement_score":0.0046116533,"about_ca_system_score_codex":0.00095454836,"about_ca_system_score_gemma":0.001570363,"threshold_uncertainty_score":0.024389088},"labels":[],"label_agreement":null},{"id":"W4401410605","doi":"10.1016/j.autcon.2024.105676","title":"Updating simulation model parameters using stochastic gradient descent","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Stochastic Gradient Optimization Techniques","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Descent (aeronautics); Stochastic gradient descent; Computer science; Gradient descent; Mathematical optimization; Applied mathematics; Mathematics; Engineering; Artificial intelligence; Aerospace engineering; Artificial neural network","score_opus":0.03705394001229035,"score_gpt":0.29681311961372253,"score_spread":0.2597591796014322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401410605","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0048692017,0.00003131,0.99379337,0.00005333996,0.00001677381,0.000024111892,0.000016782404,0.0005636797,0.0006314392],"genre_scores_gemma":[0.41848806,0.0001065764,0.5787512,0.00011521612,0.00003190819,0.00021994406,0.00020852483,0.00039728626,0.0016813073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896646,0.00036053974,0.000066388806,0.00017687194,0.00035434065,0.00007538773],"domain_scores_gemma":[0.99756765,0.0011435187,0.00025244727,0.00030681648,0.0006658207,0.00006377712],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00194358,0.0012518925,0.0011975471,0.0010976472,0.0006367869,0.0011179104,0.0014124163,0.001027288,0.0015204086],"category_scores_gemma":[0.008201815,0.0008916788,0.00078897376,0.0005404833,0.00072848244,0.0013017029,0.0011178853,0.0015863035,0.00061894464],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025369873,0.000033070002,0.00070475636,0.000031310767,0.000029673742,0.000024356075,0.000044891127,0.9631088,0.0018395944,0.0030388099,0.000489561,0.030629842],"study_design_scores_gemma":[0.000002074322,0.0000057491343,0.000037081114,0.000001969131,0.0000018078208,0.0000034702,0.0000017096429,0.998809,0.00044035606,0.0004405436,0.0002536469,0.0000026726273],"about_ca_topic_score_codex":0.014796275,"about_ca_topic_score_gemma":0.011743981,"teacher_disagreement_score":0.014796275,"about_ca_system_score_codex":0.0012940759,"about_ca_system_score_gemma":0.0019511544,"threshold_uncertainty_score":0.029420316},"labels":[],"label_agreement":null},{"id":"W4401869555","doi":"10.1016/j.autcon.2024.105706","title":"Automated data-driven condition assessment method for concrete bridges","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Gujarat Cancer Society; Gina Cody School of Engineering and Computer Science, Concordia University","keywords":"Engineering; Construction engineering; Structural engineering; Computer science; Forensic engineering; Civil engineering; Reliability engineering","score_opus":0.01606159975517811,"score_gpt":0.33285487854309276,"score_spread":0.31679327878791463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401869555","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029873425,0.000109911314,0.95515394,0.000052995667,0.000025786827,0.00027720068,0.0019376674,0.010232027,0.0023369032],"genre_scores_gemma":[0.27732748,0.00011434017,0.7147629,0.000049629114,0.000019978046,0.0005406704,0.0045369267,0.00033195302,0.002316071],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982761,0.00017780924,0.00015249613,0.00045775351,0.0008682296,0.000067608074],"domain_scores_gemma":[0.99669975,0.0007647968,0.0003564896,0.00039746196,0.0017088506,0.000072740346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011926135,0.0008026868,0.000572099,0.004809641,0.0003612579,0.0010882792,0.00090793415,0.000546868,0.0031688125],"category_scores_gemma":[0.0060691,0.00035037295,0.00055794657,0.0019829716,0.00026744406,0.0010609315,0.0009027988,0.00056444574,0.0015353946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025389873,0.0002408397,0.018176937,0.0003418488,0.00009524156,0.00032860955,0.00039258774,0.04495242,0.0636344,0.0042181667,0.009073922,0.85829115],"study_design_scores_gemma":[0.00005901264,0.00013398842,0.019530278,0.000082370454,0.00007376265,0.00043283554,0.00024512556,0.8903264,0.06646834,0.0061461604,0.01639309,0.000108654276],"about_ca_topic_score_codex":0.006775147,"about_ca_topic_score_gemma":0.008040118,"teacher_disagreement_score":0.006775147,"about_ca_system_score_codex":0.000711804,"about_ca_system_score_gemma":0.0015372342,"threshold_uncertainty_score":0.013471425},"labels":[],"label_agreement":null},{"id":"W4401931027","doi":"10.1016/j.autcon.2024.105712","title":"Linear Scheduling Method-Based Multi-Objective Optimization for Off-Site Construction Manufacturing","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Canada First Research Excellence Fund","keywords":"Scheduling (production processes); Computer science; Industrial engineering; Engineering; Mathematical optimization; Manufacturing engineering; Operations management; Mathematics","score_opus":0.012215136411809036,"score_gpt":0.2645690417614487,"score_spread":0.25235390534963964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401931027","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028311782,0.00045491973,0.96281916,0.00015487026,0.00012477569,0.00010946854,0.00010457363,0.0003856741,0.007534778],"genre_scores_gemma":[0.7551201,0.00040915835,0.23567511,0.00013907484,0.0001077354,0.0004636376,0.00028645643,0.00024894768,0.007549828],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993568,0.00029938054,0.00001727744,0.00007617349,0.00015812382,0.000092297305],"domain_scores_gemma":[0.9991358,0.000564904,0.000078563266,0.000026443422,0.0001491042,0.0000451462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012700151,0.0011032842,0.0016451833,0.000774978,0.000529114,0.0010220614,0.0012931298,0.0010660873,0.004182661],"category_scores_gemma":[0.001502596,0.0007504702,0.0011045055,0.0010602049,0.00050508906,0.00072846125,0.0008410604,0.0012249098,0.0004496715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036791895,0.000037074056,0.00006998841,0.000044087035,0.000014593509,0.000016323784,0.0000099640265,0.9912096,0.0004952442,0.00082345953,0.00031004628,0.006932786],"study_design_scores_gemma":[0.000004558129,0.0000152318335,0.00002357252,0.0000012201658,0.0000022572854,0.0000014240065,0.0000023359305,0.9996301,0.00006943212,0.00017380997,0.000074661046,0.0000013772807],"about_ca_topic_score_codex":0.014432027,"about_ca_topic_score_gemma":0.011229801,"teacher_disagreement_score":0.014432027,"about_ca_system_score_codex":0.0010370892,"about_ca_system_score_gemma":0.0022329926,"threshold_uncertainty_score":0.028696},"labels":[],"label_agreement":null},{"id":"W4402289902","doi":"10.1016/j.autcon.2024.105731","title":"Automated safety and practicality enhancement of lift plans in modular construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Lift (data mining); Modular design; Engineering; Construction engineering; Modular construction; Computer science; Architectural engineering; Engineering drawing; Civil engineering; Systems engineering; Transport engineering; Data mining; Programming language","score_opus":0.0068668339688412955,"score_gpt":0.23929298330853352,"score_spread":0.23242614933969222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402289902","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28274548,0.000143825,0.7050623,0.00014759181,0.00002686993,0.00014093291,0.0000901974,0.0013536859,0.010289081],"genre_scores_gemma":[0.9298384,0.000051216244,0.068801574,0.000012157385,0.000007880946,0.000034810026,0.00010561195,0.00006859951,0.0010797943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998589,0.00048312714,0.000039866314,0.00014799793,0.0006001177,0.00013991918],"domain_scores_gemma":[0.9979424,0.00081949175,0.00021597487,0.0005135274,0.00043967032,0.000068993126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012194152,0.0005676857,0.0003870237,0.00077353127,0.00048808995,0.00089562795,0.00057362864,0.00045277164,0.0026679162],"category_scores_gemma":[0.003705777,0.00033422123,0.00052909757,0.0003922846,0.00094014325,0.0011444625,0.0016320803,0.00061622995,0.00043414542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010921994,0.00041591912,0.006668759,0.00026430347,0.000059976,0.00039628358,0.0009955254,0.4583197,0.07626808,0.04908855,0.0017410405,0.40468958],"study_design_scores_gemma":[0.000033401786,0.00032843652,0.0036340083,0.000027596778,0.000046009478,0.00017427401,0.00018895195,0.9347346,0.038619578,0.019244703,0.0029449547,0.00002342606],"about_ca_topic_score_codex":0.0013011823,"about_ca_topic_score_gemma":0.0012587137,"teacher_disagreement_score":0.0026679162,"about_ca_system_score_codex":0.00045838763,"about_ca_system_score_gemma":0.0012080162,"threshold_uncertainty_score":0.008925021},"labels":[],"label_agreement":null},{"id":"W4402737439","doi":"10.1016/j.autcon.2024.105778","title":"Data integration using deep learning and real-time locating system (RTLS) for automated construction progress monitoring and reporting","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Indoor and Outdoor Localization Technologies","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Real-time locating system; Real-time computing; Computer science; Engineering; Real-time data; Systems engineering; Artificial intelligence; Embedded system; Data mining; Operating system","score_opus":0.027853642636243722,"score_gpt":0.30775286265789126,"score_spread":0.2798992200216475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402737439","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05324195,0.00046126416,0.93905747,0.00026749517,0.00012939861,0.00008382839,0.0003635028,0.005012682,0.0013824406],"genre_scores_gemma":[0.6700503,0.00045318628,0.32292348,0.00029240502,0.00007315126,0.0002220145,0.0015389066,0.00014717317,0.004299433],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906915,0.00013924774,0.00009388803,0.000259508,0.00033643417,0.000101841244],"domain_scores_gemma":[0.9990283,0.00016306952,0.00012804382,0.00016584502,0.00046863378,0.000046105753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009965426,0.000864205,0.00068656227,0.0015132157,0.0002935866,0.00082466437,0.0010331942,0.00080927496,0.0014332748],"category_scores_gemma":[0.0022474,0.0003256298,0.00071084575,0.0011944746,0.00027008646,0.0015679902,0.0012040116,0.0009338978,0.0008601492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040495247,0.00036279424,0.010306056,0.00017858541,0.0001976979,0.00020892853,0.00017326762,0.08947385,0.024342421,0.0018773553,0.005015145,0.867459],"study_design_scores_gemma":[0.000016438145,0.00015285192,0.0040618135,0.000024636487,0.00005961055,0.00008749916,0.00006592877,0.9667817,0.02338911,0.0018195377,0.0035081622,0.000032741482],"about_ca_topic_score_codex":0.0054979967,"about_ca_topic_score_gemma":0.006451473,"teacher_disagreement_score":0.0054979967,"about_ca_system_score_codex":0.00078435196,"about_ca_system_score_gemma":0.0011055113,"threshold_uncertainty_score":0.010931969},"labels":[],"label_agreement":null},{"id":"W4403945008","doi":"10.1016/j.autcon.2024.105841","title":"Simulation-based planning of earthmoving equipment for reducing greenhouse gas (GHG) emissions","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Vehicle emissions and performance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Greenhouse gas; Waste management; Fugitive emissions; Engineering; Environmental science; Environmental engineering","score_opus":0.018227133060332,"score_gpt":0.2794509628253605,"score_spread":0.2612238297650285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403945008","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67819995,0.00044938526,0.27430972,0.00049881503,0.00009922444,0.00024025969,0.00097210146,0.0010616354,0.044169],"genre_scores_gemma":[0.9880384,0.00009144197,0.009782078,0.000014832641,0.0000030834158,0.000050147704,0.00015355196,0.000025034798,0.0018414308],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982893,0.00005701847,0.0000053696544,0.000027870356,0.000036098576,0.000044726326],"domain_scores_gemma":[0.9996462,0.00020741709,0.000030459347,0.00001674468,0.000055033222,0.0000440899],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029244236,0.0006591879,0.0007700572,0.00069583196,0.00055593735,0.0008517145,0.00078793394,0.0009351456,0.0050853468],"category_scores_gemma":[0.00070852635,0.0006140867,0.0007579499,0.000616948,0.00053781003,0.0006201622,0.0004895166,0.0005356013,0.0002599147],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012760014,0.000008880884,0.00013375039,0.000004778439,0.0000022815743,0.000007977508,0.0000035448288,0.99886537,0.00010110348,0.00020520396,0.00003595904,0.0006185081],"study_design_scores_gemma":[0.000007000625,0.000015816358,0.0001381354,0.000002672834,0.0000035450416,0.0000018199283,0.00001058137,0.9991874,0.00016400668,0.00034916407,0.0001172842,0.0000025771797],"about_ca_topic_score_codex":0.052261896,"about_ca_topic_score_gemma":0.043020602,"teacher_disagreement_score":0.052261896,"about_ca_system_score_codex":0.00131688,"about_ca_system_score_gemma":0.0019297822,"threshold_uncertainty_score":0.10391539},"labels":[],"label_agreement":null},{"id":"W4404073372","doi":"10.1016/j.autcon.2024.105853","title":"Rutting extraction from vehicle-borne laser point clouds","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Remote Sensing and LiDAR Applications","field":"Environmental Science","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Point cloud; Extraction (chemistry); Point (geometry); Environmental science; Rut; Laser scanning; Laser; Engineering; Computer science; Geography; Artificial intelligence; Mathematics; Optics; Cartography; Physics; Geometry","score_opus":0.007760767498928048,"score_gpt":0.2477086593962074,"score_spread":0.23994789189727936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404073372","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20087108,0.0010875023,0.77916485,0.00012391314,0.000119947115,0.00019370535,0.0036022044,0.009974721,0.0048620766],"genre_scores_gemma":[0.7564907,0.0011048599,0.22620079,0.00004269226,0.00006607849,0.000102381186,0.01014315,0.0005192621,0.005330109],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951696,0.00002631582,0.000022545293,0.00010848554,0.00022796598,0.00009777542],"domain_scores_gemma":[0.9995285,0.00009638614,0.00007188328,0.0001100674,0.00017126655,0.000021968242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022390322,0.00094617554,0.0010229874,0.003216981,0.0003949435,0.0010552633,0.001153282,0.000913354,0.0020903163],"category_scores_gemma":[0.00095093425,0.0006924503,0.00086773705,0.0024916264,0.0002971763,0.0010004338,0.0007699142,0.0007429414,0.002616246],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020686124,0.00016492118,0.009794735,0.00050037564,0.00011996086,0.00060451875,0.00017571144,0.08221382,0.11250575,0.0019337451,0.008684364,0.78309524],"study_design_scores_gemma":[0.000031858825,0.00011221591,0.041291185,0.000106039726,0.00012295852,0.0007340291,0.00025762653,0.8628258,0.07784023,0.0028640872,0.013728804,0.00008519954],"about_ca_topic_score_codex":0.0066310735,"about_ca_topic_score_gemma":0.010541691,"teacher_disagreement_score":0.0066310735,"about_ca_system_score_codex":0.00025165855,"about_ca_system_score_gemma":0.0006327946,"threshold_uncertainty_score":0.013184965},"labels":[],"label_agreement":null},{"id":"W4404129430","doi":"10.1016/j.autcon.2024.105850","title":"RGB-LiDAR sensor fusion for dust de-filtering in autonomous excavation applications","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Advanced Optical Sensing Technologies","field":"Physics and Astronomy","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Korea Institute of Machinery and Materials","keywords":"Lidar; Excavation; RGB color model; Fusion; Sensor fusion; Remote sensing; Computer science; Computer vision; Artificial intelligence; Engineering; Geology; Geotechnical engineering","score_opus":0.011531200693971656,"score_gpt":0.27872755330484916,"score_spread":0.2671963526108775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404129430","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17869304,0.0009302291,0.8146148,0.00020792313,0.00014704106,0.0000612255,0.00022103245,0.0025056745,0.0026190677],"genre_scores_gemma":[0.894661,0.00029668535,0.10274211,0.000106214626,0.000030724772,0.000030303287,0.00026881567,0.00004298553,0.0018211465],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997003,0.000028286044,0.000012453832,0.00007078275,0.00014683839,0.0000412958],"domain_scores_gemma":[0.99983525,0.000027729751,0.000020313617,0.00002784577,0.00007912537,0.000009740428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035776428,0.00050852745,0.00038222634,0.00050318975,0.0002347201,0.0004010874,0.0004934502,0.0005501088,0.0009268593],"category_scores_gemma":[0.0004991983,0.00020011704,0.00048062674,0.00047140237,0.00018406517,0.0007662628,0.0005882148,0.0004565291,0.00045969838],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004811638,0.000263132,0.008717838,0.00024242821,0.00014096993,0.00026047337,0.00020258497,0.12365075,0.25041223,0.0018429297,0.0028872925,0.61089814],"study_design_scores_gemma":[0.000010485071,0.00015499779,0.00705685,0.000013847263,0.000040535866,0.0001550114,0.0000649055,0.90313095,0.08433961,0.0014023058,0.0036057236,0.000024726036],"about_ca_topic_score_codex":0.0036486695,"about_ca_topic_score_gemma":0.004965893,"teacher_disagreement_score":0.0036486695,"about_ca_system_score_codex":0.00042237536,"about_ca_system_score_gemma":0.00040247163,"threshold_uncertainty_score":0.007254839},"labels":[],"label_agreement":null},{"id":"W4404212487","doi":"10.1016/j.autcon.2024.105836","title":"Predicting and managing risk interactions and systemic risks in infrastructure projects using machine learning","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Complex Systems and Decision Making","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Systemic risk; Risk analysis (engineering); Computer science; Risk management; Risk assessment; Engineering; Business; Finance; Computer security; Economics","score_opus":0.08295039578040496,"score_gpt":0.389185018103858,"score_spread":0.30623462232345305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404212487","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53198737,0.0006103395,0.46059746,0.0019485796,0.00005026231,0.00016549093,0.00034398984,0.00046554406,0.0038309183],"genre_scores_gemma":[0.9704616,0.00018679179,0.028520225,0.000055457724,0.000022742859,0.00006626991,0.00020981707,0.000015874197,0.00046118547],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99822825,0.0007973926,0.0001261443,0.00032533705,0.00031163808,0.0002112471],"domain_scores_gemma":[0.9900642,0.0070620715,0.0015362654,0.00041617296,0.00061161356,0.00030971578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039397106,0.0010650494,0.00083096937,0.0017951791,0.0005639069,0.0021250409,0.0011235205,0.0011930389,0.00089463615],"category_scores_gemma":[0.010817066,0.0006169116,0.0006859687,0.0012400014,0.0007641267,0.002970952,0.0016995886,0.0018251548,0.00015924773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027434919,0.00007896116,0.014929294,0.000030274401,0.000042396303,0.00006006859,0.000058778754,0.96458644,0.00023211936,0.0017546882,0.00028022903,0.017919334],"study_design_scores_gemma":[0.000001915186,0.0000198486,0.0014061076,0.0000075856815,0.00000598726,0.000009153543,0.00003366002,0.9938605,0.00013359562,0.004406798,0.00010845938,0.0000063699413],"about_ca_topic_score_codex":0.0081338445,"about_ca_topic_score_gemma":0.007982291,"teacher_disagreement_score":0.0081338445,"about_ca_system_score_codex":0.0016779102,"about_ca_system_score_gemma":0.001994184,"threshold_uncertainty_score":0.0208354},"labels":[],"label_agreement":null},{"id":"W4404280355","doi":"10.1016/j.autcon.2024.105846","title":"Performance comparison of retrieval-augmented generation and fine-tuned large language models for construction safety management knowledge retrieval","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":90,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Information retrieval","score_opus":0.06852945978436745,"score_gpt":0.448781636626997,"score_spread":0.3802521768426296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404280355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6848989,0.010860992,0.17918248,0.0012534955,0.0011588163,0.00068249804,0.0073427814,0.10110172,0.0135183735],"genre_scores_gemma":[0.8215591,0.0015465405,0.14585327,0.00051783776,0.00016375932,0.00025472528,0.021042392,0.0014473192,0.0076151243],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980123,0.0007011062,0.00022863795,0.0005544171,0.0002975374,0.00020594879],"domain_scores_gemma":[0.9951835,0.003304197,0.00011712088,0.0005358645,0.0006432226,0.00021601444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022763405,0.0019304906,0.0018109254,0.001707361,0.0005886494,0.002262286,0.0021738904,0.002266511,0.008497347],"category_scores_gemma":[0.009033238,0.000558473,0.0013440652,0.0012478301,0.00037274943,0.003073483,0.0017309274,0.0013329764,0.004814279],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0064387554,0.0012524301,0.004276533,0.00143383,0.00069816614,0.00051627576,0.00040232725,0.066023014,0.037837625,0.001197714,0.025195846,0.85472745],"study_design_scores_gemma":[0.0006095567,0.0013023217,0.00396516,0.000064624095,0.00062086666,0.00052572327,0.00044699627,0.9509,0.03356856,0.0016202191,0.0062401635,0.0001357759],"about_ca_topic_score_codex":0.019245317,"about_ca_topic_score_gemma":0.012916678,"teacher_disagreement_score":0.019245317,"about_ca_system_score_codex":0.0009624968,"about_ca_system_score_gemma":0.0020216356,"threshold_uncertainty_score":0.0382666},"labels":[],"label_agreement":null},{"id":"W4404514270","doi":"10.1016/j.autcon.2024.105878","title":"3D Pixelwise damage mapping using a deep attention based modified Nerfacto","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs; Canada Foundation for Innovation","keywords":"Artificial intelligence; Computer science; Algorithm; Computer vision; Computer graphics (images)","score_opus":0.012473211007411932,"score_gpt":0.23111075595597336,"score_spread":0.2186375449485614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404514270","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041862357,0.000199047,0.95463294,0.00014978231,0.00003672562,0.000032062853,0.000101811995,0.00073363946,0.0022515447],"genre_scores_gemma":[0.7435938,0.0003212692,0.24814461,0.00025973032,0.000042753065,0.00009668774,0.0004746197,0.00017054875,0.0068959855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998791,0.000012292746,0.0000046338896,0.000035192097,0.00004997547,0.000018740624],"domain_scores_gemma":[0.9998704,0.00003625457,0.000020292955,0.000020023126,0.000038909315,0.000014135281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002531262,0.0006195457,0.000410698,0.00059038115,0.00016434507,0.00042153453,0.0011928668,0.0009062768,0.0015271883],"category_scores_gemma":[0.00057874754,0.0003296822,0.0008031046,0.00028689622,0.00035515733,0.000720136,0.0007317477,0.0005781309,0.00031294534],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099229175,0.000059073027,0.0013783369,0.000055892,0.00005979929,0.00019334511,0.0000626141,0.8565692,0.020664774,0.0031564485,0.0010800845,0.11662129],"study_design_scores_gemma":[0.0000015060383,0.000014515282,0.00016537301,0.000002183415,0.000005114959,0.000035202323,0.0000019928302,0.9980135,0.001065108,0.00046000208,0.00023194615,0.000003548114],"about_ca_topic_score_codex":0.0053949305,"about_ca_topic_score_gemma":0.006136373,"teacher_disagreement_score":0.0053949305,"about_ca_system_score_codex":0.00042449066,"about_ca_system_score_gemma":0.00049153535,"threshold_uncertainty_score":0.010727048},"labels":[],"label_agreement":null},{"id":"W4404624846","doi":"10.1016/j.autcon.2024.105877","title":"Signs on glasses: LiDAR data voids, hotspot effect, and reflection artifacts","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Hotspot (geology); Lidar; Remote sensing; Reflection (computer programming); Optics; Geology; Computer science; Computer graphics (images); Computer vision; Seismology; Physics","score_opus":0.03362715922466234,"score_gpt":0.28230209839088677,"score_spread":0.24867493916622443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404624846","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8324985,0.001168344,0.14830221,0.0012984345,0.00020627416,0.00008145299,0.00049012917,0.0016457497,0.014308825],"genre_scores_gemma":[0.9879112,0.00019911771,0.010142876,0.000053693766,0.000055654484,0.0000066320113,0.00016329114,0.000134033,0.0013335107],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9984687,0.00039004034,0.000073393356,0.00028419265,0.00062357646,0.00016007696],"domain_scores_gemma":[0.990063,0.0047077434,0.0021260772,0.0018360402,0.00096053985,0.00030663828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015963644,0.0006201099,0.00046704191,0.0016502952,0.00057740946,0.002368634,0.00079409947,0.0013009636,0.0031390633],"category_scores_gemma":[0.012275155,0.00052433216,0.0004399413,0.0018229046,0.0020269628,0.0030808775,0.0016923775,0.0010341248,0.00038225294],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017766984,0.0005008945,0.30674815,0.00071308814,0.0003698634,0.0052058618,0.0035167478,0.061155073,0.05824983,0.04045851,0.011966134,0.50933915],"study_design_scores_gemma":[0.00013332577,0.00085967913,0.44720173,0.00038098425,0.0009979055,0.0147305,0.0051818695,0.38426462,0.088461295,0.038188785,0.019145485,0.00045384807],"about_ca_topic_score_codex":0.0040898737,"about_ca_topic_score_gemma":0.006701371,"teacher_disagreement_score":0.0040898737,"about_ca_system_score_codex":0.000503445,"about_ca_system_score_gemma":0.0006284668,"threshold_uncertainty_score":0.010501146},"labels":[],"label_agreement":null},{"id":"W4405250345","doi":"10.1016/j.autcon.2024.105928","title":"Entropy-centric framework for understanding and managing project dynamics in construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Entropy (arrow of time); Computer science; Systems engineering; Engineering; Construction engineering; Engineering management; Physics","score_opus":0.08513719824578415,"score_gpt":0.37478403327065835,"score_spread":0.2896468350248742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405250345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009912181,0.00040249425,0.9822939,0.00067459384,0.000046199802,0.00009517948,0.00015135683,0.000108716624,0.006315382],"genre_scores_gemma":[0.6157304,0.0013345679,0.378409,0.00020934339,0.00023420497,0.00054856995,0.000341011,0.0000804287,0.0031124935],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99842596,0.00078668166,0.00012652569,0.00023349535,0.00031935945,0.00010808372],"domain_scores_gemma":[0.9975026,0.0014365918,0.00040898882,0.0002259435,0.00027144526,0.0001544464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031680323,0.0011415961,0.0006872634,0.0039700386,0.00089644926,0.003166247,0.0011464406,0.0007858325,0.0023459184],"category_scores_gemma":[0.0049583404,0.0004380623,0.0012566258,0.0018417237,0.003182998,0.004257204,0.0024718118,0.0013444423,0.00022322602],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000385387,0.000059405167,0.005803287,0.00021237726,0.00010562862,0.00023479709,0.0011383081,0.31884086,0.0015590346,0.6322117,0.001135357,0.038660817],"study_design_scores_gemma":[0.000011688685,0.0000786086,0.0025313199,0.00016285083,0.00004653051,0.00009461305,0.00078686466,0.51176786,0.0007592616,0.47399652,0.00970921,0.00005469395],"about_ca_topic_score_codex":0.005572279,"about_ca_topic_score_gemma":0.0054070414,"teacher_disagreement_score":0.005572279,"about_ca_system_score_codex":0.0029737798,"about_ca_system_score_gemma":0.0028960705,"threshold_uncertainty_score":0.021576405},"labels":[],"label_agreement":null},{"id":"W4405431381","doi":"10.1016/j.autcon.2024.105937","title":"Sensor adoption in the construction industry: Barriers, opportunities, and strategies","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Engineering; Construction engineering; Business; Manufacturing engineering; Computer science; Engineering management","score_opus":0.018231657081341373,"score_gpt":0.23212504588696073,"score_spread":0.21389338880561937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405431381","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6253263,0.26638016,0.016742064,0.06650988,0.0005891662,0.0010716787,0.00041592921,0.000077535,0.022887291],"genre_scores_gemma":[0.9145868,0.07350982,0.0072803246,0.0030947386,0.000071346985,0.00061814365,0.00011833982,0.00003001193,0.0006905529],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.93291277,0.038166393,0.008672983,0.002668955,0.014425923,0.0031529628],"domain_scores_gemma":[0.8141721,0.15112315,0.01660613,0.0015911362,0.014651113,0.0018563331],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06710612,0.00055515073,0.0010978966,0.006951602,0.0022385132,0.0068206014,0.0016574836,0.0018589735,0.0013312319],"category_scores_gemma":[0.10125848,0.00080480915,0.0013844881,0.009367822,0.003998377,0.0083185155,0.0056350776,0.002196835,0.0001512884],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003107516,0.00035769917,0.16857822,0.0779104,0.0010091158,0.001933448,0.19141157,0.0016452718,0.0020545404,0.06091643,0.00537423,0.48849836],"study_design_scores_gemma":[0.000085547006,0.00071185676,0.10915321,0.11280082,0.0014047172,0.0023745198,0.5963949,0.0022646363,0.0028245945,0.025950972,0.1458008,0.00023342697],"about_ca_topic_score_codex":0.0118827475,"about_ca_topic_score_gemma":0.014895073,"teacher_disagreement_score":0.06710612,"about_ca_system_score_codex":0.007867579,"about_ca_system_score_gemma":0.022953019,"threshold_uncertainty_score":0.35489535},"labels":[],"label_agreement":null},{"id":"W4405505932","doi":"10.1016/j.autcon.2024.105933","title":"Egocentric-video-based construction quality supervision (EgoConQS): Application of automatic key activity queries","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"National Key Research and Development Program of China; Natural Science Foundation of Hunan Province; National Natural Science Foundation of China","keywords":"Key (lock); Quality (philosophy); Computer science; Human–computer interaction; Engineering drawing; Computer vision; Computer graphics (images); Engineering; Computer security","score_opus":0.009394161564362132,"score_gpt":0.25239538147606716,"score_spread":0.24300121991170504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405505932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15340151,0.00083231356,0.8128172,0.00030389518,0.00009370638,0.0011841084,0.007821835,0.013160977,0.010384377],"genre_scores_gemma":[0.6784043,0.00053292676,0.3068186,0.00011081135,0.000045799923,0.0005574007,0.009647978,0.00036562915,0.0035165434],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841166,0.00032948065,0.00012470353,0.00040849092,0.0006125065,0.000113125556],"domain_scores_gemma":[0.99654007,0.0007940689,0.00066545466,0.0005587419,0.0012978362,0.0001438248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013454842,0.0008876061,0.000532894,0.0034319356,0.00032036484,0.00082308415,0.00094519486,0.00057324005,0.0015878689],"category_scores_gemma":[0.0063011544,0.00020795368,0.00030274846,0.0022088953,0.0003208334,0.0019204216,0.001504213,0.00047649638,0.00092299544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007114394,0.0003150689,0.05513154,0.0010976522,0.00012228174,0.00033730536,0.0021422734,0.01980897,0.03952678,0.007917448,0.021855341,0.8510339],"study_design_scores_gemma":[0.000077978424,0.00065898825,0.11405623,0.00028522834,0.00015540478,0.00094072905,0.003506243,0.7089145,0.08706161,0.016018182,0.06811349,0.00021144564],"about_ca_topic_score_codex":0.009819293,"about_ca_topic_score_gemma":0.013093594,"teacher_disagreement_score":0.009819293,"about_ca_system_score_codex":0.00067102164,"about_ca_system_score_gemma":0.0010540541,"threshold_uncertainty_score":0.019524276},"labels":[],"label_agreement":null},{"id":"W4405839419","doi":"10.1016/j.autcon.2024.105951","title":"Deep learning-enhanced smart ground robotic system for automated structural damage inspection and mapping","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Artificial intelligence; Deep learning; Computer science; Computer vision; Robotics; Engineering; Robot","score_opus":0.005623796657275746,"score_gpt":0.2198006534763842,"score_spread":0.21417685681910845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405839419","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044647016,0.00020933522,0.9396391,0.00013963669,0.0000806789,0.00007809368,0.00029774648,0.010516685,0.0043917587],"genre_scores_gemma":[0.6139995,0.00017157271,0.3750973,0.00029028166,0.00003743597,0.00020173259,0.0014027536,0.00020998967,0.008589434],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980384,0.000013446638,0.0000069168664,0.000059746566,0.00008081621,0.000035249803],"domain_scores_gemma":[0.9998976,0.000009935889,0.000016962442,0.00002795258,0.000035127025,0.000012409763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019539485,0.0005048523,0.0003842104,0.00036319185,0.00019678082,0.00032505166,0.00098928,0.0004400493,0.0030099784],"category_scores_gemma":[0.00027098146,0.00020753394,0.000318261,0.00026603922,0.00021771209,0.0005786422,0.0008647899,0.0005763947,0.0012533177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022116546,0.00025303938,0.0027535658,0.00018472386,0.0000812601,0.00023281442,0.00011341286,0.11664939,0.12200543,0.0042753695,0.016661188,0.7365686],"study_design_scores_gemma":[0.000032993205,0.00020654054,0.0028424487,0.00001464753,0.000028177152,0.00013865219,0.000029469418,0.9523759,0.030439734,0.0024327363,0.01143306,0.000025650696],"about_ca_topic_score_codex":0.0030056927,"about_ca_topic_score_gemma":0.005398498,"teacher_disagreement_score":0.0030099784,"about_ca_system_score_codex":0.0003898474,"about_ca_system_score_gemma":0.00081302534,"threshold_uncertainty_score":0.01006937},"labels":[],"label_agreement":null},{"id":"W4406556094","doi":"10.1016/j.autcon.2025.105965","title":"Integration of thermographic inspection data with BIM for enhanced concrete infrastructure assessment","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Engineering; Forensic engineering; Construction engineering; Computer science","score_opus":0.01493892816874389,"score_gpt":0.27145967968656626,"score_spread":0.2565207515178224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406556094","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022471849,0.00014697606,0.9712507,0.000100362486,0.000023831863,0.0000980348,0.0004254171,0.0028479653,0.0026348734],"genre_scores_gemma":[0.33448866,0.0002468914,0.6628063,0.000050569644,0.000023367995,0.00014242122,0.0010297275,0.00025604767,0.0009560775],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9987663,0.00032562824,0.00007037619,0.00015733099,0.00060712604,0.00007326136],"domain_scores_gemma":[0.998629,0.0003516816,0.00019024669,0.00035597273,0.00041279977,0.000060361268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012757331,0.0008262588,0.0005520423,0.0035797684,0.0002963394,0.0013191666,0.0010162082,0.0005099686,0.0019746698],"category_scores_gemma":[0.002834521,0.00047044846,0.00071973907,0.0018134562,0.0003892838,0.0017291822,0.0018555534,0.00053563144,0.0007032104],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021892873,0.00033457912,0.012787075,0.0005378117,0.00013931573,0.0003950028,0.00093339686,0.17891422,0.06454825,0.013735009,0.0034346234,0.72402173],"study_design_scores_gemma":[0.000021683085,0.00016761168,0.011479222,0.00015835911,0.000091072674,0.00043414586,0.0006707441,0.9014688,0.050363652,0.011605649,0.023428742,0.00011027027],"about_ca_topic_score_codex":0.0029802192,"about_ca_topic_score_gemma":0.005110102,"teacher_disagreement_score":0.0035797684,"about_ca_system_score_codex":0.00044001863,"about_ca_system_score_gemma":0.0009080964,"threshold_uncertainty_score":0.0067468286},"labels":[],"label_agreement":null},{"id":"W4406819494","doi":"10.1016/j.autcon.2025.105986","title":"Agile digitization for historic architecture using 360° capture, deep learning, and virtual reality","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; MacEwan University","funders":"Sentinelle Nord, Université Laval","keywords":"Digitization; Agile software development; Architecture; Virtual reality; Computer science; Engineering; Deep learning; Artificial intelligence; Multimedia; Human–computer interaction; Software engineering; Archaeology; Geography; Telecommunications","score_opus":0.013032323044927525,"score_gpt":0.2441757190695253,"score_spread":0.23114339602459777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406819494","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047890045,0.0001491949,0.94420296,0.000072420364,0.000029862464,0.000040743253,0.00013062806,0.0017479211,0.0057361303],"genre_scores_gemma":[0.5510965,0.00028715175,0.4429666,0.00006804833,0.00001325389,0.00004959387,0.0005121087,0.00038371267,0.0046230303],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995492,0.000041606883,0.0000149466005,0.00010161178,0.00021915851,0.00007355852],"domain_scores_gemma":[0.9996196,0.00007318688,0.000033364795,0.0001504649,0.00009799466,0.000025432077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004086576,0.0006594223,0.00046211525,0.0012425203,0.0003630139,0.0014146342,0.00074175076,0.00038997398,0.0030476884],"category_scores_gemma":[0.00083148986,0.0005128989,0.0005758577,0.0010683245,0.00058001344,0.001213377,0.0020824187,0.00094056106,0.00083219365],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014445405,0.000102702164,0.005180927,0.00011222661,0.00005797987,0.0001095204,0.00047178112,0.17139873,0.048698276,0.010353211,0.0036207682,0.7597495],"study_design_scores_gemma":[0.000016655114,0.00012589608,0.006104742,0.000032665223,0.000035424033,0.00024328951,0.00035683555,0.9371646,0.035109133,0.0074493717,0.013307527,0.000053902397],"about_ca_topic_score_codex":0.0064312494,"about_ca_topic_score_gemma":0.015864007,"teacher_disagreement_score":0.0064312494,"about_ca_system_score_codex":0.00059015246,"about_ca_system_score_gemma":0.0009918322,"threshold_uncertainty_score":0.01278764},"labels":[],"label_agreement":null},{"id":"W4407053146","doi":"10.1016/j.autcon.2025.105993","title":"Robotic motion planning for autonomous in-situ construction of building structures","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Motion (physics); Motion planning; Computer science; Construction engineering; Engineering; Artificial intelligence; Robot; Systems engineering","score_opus":0.011111376679818121,"score_gpt":0.26497983298906763,"score_spread":0.25386845630924953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407053146","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0686323,0.00012384524,0.92401415,0.000084415646,0.000039212435,0.000054266646,0.000074680145,0.00073093467,0.006246181],"genre_scores_gemma":[0.9012889,0.00007162411,0.09575922,0.00001773095,0.0000074055065,0.00007213398,0.000081628204,0.000048351943,0.0026529927],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99987197,0.00003002901,0.0000043352698,0.000035814483,0.00003723176,0.0000206696],"domain_scores_gemma":[0.9998635,0.0000611624,0.000023203009,0.000023132548,0.00001591811,0.000013004281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022427368,0.00042690968,0.00036086052,0.0002081987,0.00037802185,0.00031775862,0.0006050596,0.00044867198,0.0017903313],"category_scores_gemma":[0.000435246,0.00035838078,0.00029896377,0.00019479326,0.00050032034,0.0003935568,0.00081663806,0.00045923848,0.00027373078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012518848,0.000068223664,0.00050229207,0.000074358344,0.000027566322,0.00009340182,0.00011131245,0.89797974,0.022195406,0.0060440022,0.001044788,0.07173367],"study_design_scores_gemma":[0.000008444436,0.000051852614,0.00027660647,0.00000395599,0.000004348946,0.00001948884,0.000019836207,0.99258643,0.003489876,0.0024997632,0.001034196,0.0000051109723],"about_ca_topic_score_codex":0.0033278104,"about_ca_topic_score_gemma":0.0059767966,"teacher_disagreement_score":0.0033278104,"about_ca_system_score_codex":0.00030438282,"about_ca_system_score_gemma":0.0006178289,"threshold_uncertainty_score":0.0066168904},"labels":[],"label_agreement":null},{"id":"W4407242508","doi":"10.1016/j.autcon.2025.106006","title":"Cost-effective LiDAR for pothole detection and quantification using a low-point-density approach","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Pothole (geology); Lidar; Point (geometry); Computer science; Remote sensing; Environmental science; Geography; Mathematics; Geology","score_opus":0.01167603968318267,"score_gpt":0.2562175853095121,"score_spread":0.24454154562632943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407242508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09186222,0.00012970016,0.90530044,0.0000791052,0.00001572123,0.000087811844,0.00013700649,0.0013232955,0.0010646464],"genre_scores_gemma":[0.4906895,0.000095877724,0.50814486,0.00003932293,0.0000143714105,0.0000749694,0.00024122342,0.0000529323,0.00064693],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99965227,0.000041496012,0.000014151037,0.000068595815,0.00018915343,0.00003433284],"domain_scores_gemma":[0.9994716,0.00014775062,0.00006898638,0.00006929094,0.00022304125,0.000019333589],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036430208,0.0006460817,0.0004393072,0.0013502056,0.000259964,0.00061839924,0.0010053694,0.00060425996,0.0011272072],"category_scores_gemma":[0.0014089678,0.00037369123,0.0003612259,0.0006736308,0.00030624104,0.0011533787,0.0007967034,0.00038268042,0.00047926046],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025294872,0.00026979874,0.019297851,0.00027844112,0.00010577911,0.00021296012,0.000188093,0.16493355,0.25465384,0.0030341793,0.001702488,0.55507004],"study_design_scores_gemma":[0.000023179802,0.000112529284,0.009381404,0.000014713521,0.000025983949,0.00023061143,0.00007767012,0.9479479,0.038838204,0.0018258854,0.0014889727,0.000033013675],"about_ca_topic_score_codex":0.0023777324,"about_ca_topic_score_gemma":0.005552568,"teacher_disagreement_score":0.0023777324,"about_ca_system_score_codex":0.00044576157,"about_ca_system_score_gemma":0.0004595448,"threshold_uncertainty_score":0.0047278404},"labels":[],"label_agreement":null},{"id":"W4407871888","doi":"10.1016/j.autcon.2025.106066","title":"A data-driven and knowledge-based decision support system for optimized construction planning and control","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale pour le Développement de la Recherche en Santé; Agence Nationale de la Recherche; Université de Lorraine","keywords":"Decision support system; Computer science; Control (management); Engineering; Systems engineering; Construction engineering; Data mining; Operations research; Artificial intelligence","score_opus":0.012744519453692482,"score_gpt":0.26432564603905134,"score_spread":0.25158112658535886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407871888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010625562,0.00006145288,0.9809895,0.00013396084,0.000023663677,0.0001734677,0.0003680963,0.006168155,0.0014561338],"genre_scores_gemma":[0.33967635,0.00014784311,0.6560312,0.000113041526,0.000031277035,0.00063823105,0.00111098,0.00021264672,0.0020384348],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867046,0.00022093547,0.00017946413,0.00035426673,0.00049912184,0.000075811615],"domain_scores_gemma":[0.9979406,0.0009348223,0.00019726968,0.00024946834,0.0005668148,0.00011102866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025689173,0.00079646613,0.0013230748,0.0020629594,0.0008331366,0.0028747646,0.001968598,0.0010535934,0.0041728355],"category_scores_gemma":[0.005563756,0.00054435956,0.0006984923,0.0013855479,0.00043652722,0.0019357962,0.0014720135,0.0009004917,0.0010759275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009495522,0.00061184284,0.0036054777,0.00039730442,0.00023349485,0.0005769625,0.0007177683,0.39318365,0.016666198,0.018853944,0.009977088,0.55422676],"study_design_scores_gemma":[0.000067329005,0.00007726637,0.0005845639,0.000040009832,0.00005232129,0.00007472897,0.00006351086,0.9812509,0.0066448017,0.0064529846,0.004650087,0.000041489297],"about_ca_topic_score_codex":0.0040975334,"about_ca_topic_score_gemma":0.0034550582,"teacher_disagreement_score":0.0041728355,"about_ca_system_score_codex":0.0010605287,"about_ca_system_score_gemma":0.0021072768,"threshold_uncertainty_score":0.013959527},"labels":[],"label_agreement":null},{"id":"W4408055308","doi":"10.1016/j.autcon.2025.106078","title":"Embedded visualizations in crane operation user interfaces for real-time assistance","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Human-Automation Interaction and Safety","field":"Psychology","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus","funders":"","keywords":"Visualization; Human–computer interaction; Computer science; User interface; Computer graphics (images); Engineering drawing; Operating system; Embedded system; Engineering; Simulation; Artificial intelligence","score_opus":0.015122918960974424,"score_gpt":0.3901214256739299,"score_spread":0.3749985067129554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408055308","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039706085,0.82637656,0.10992125,0.0021254204,0.00057804293,0.00040830643,0.0007258456,0.0010580079,0.019100497],"genre_scores_gemma":[0.3340269,0.45872104,0.19906935,0.0011865488,0.0003619638,0.0008470402,0.0008004475,0.00028743432,0.0046992986],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99626166,0.0020174738,0.000412957,0.0002535461,0.0009822503,0.00007201524],"domain_scores_gemma":[0.982852,0.014123227,0.00085390586,0.00042285136,0.0016521184,0.00009596739],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00479524,0.0007477921,0.0006498973,0.0035046404,0.00034664368,0.003086794,0.00070478773,0.0009374303,0.0031915135],"category_scores_gemma":[0.017789952,0.0004331657,0.0009062324,0.002632489,0.0006841531,0.0027394928,0.001066729,0.0008289025,0.00042831356],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028200704,0.00008228219,0.0023092385,0.040661387,0.00032420387,0.00013386653,0.0030165352,0.002130686,0.00959713,0.010922058,0.0043186136,0.92622197],"study_design_scores_gemma":[0.00031007914,0.0024510163,0.03889247,0.09470743,0.003390232,0.003576275,0.0053309062,0.009751701,0.028445488,0.02964535,0.7830047,0.0004943722],"about_ca_topic_score_codex":0.0017879027,"about_ca_topic_score_gemma":0.0030232337,"teacher_disagreement_score":0.00479524,"about_ca_system_score_codex":0.0007020035,"about_ca_system_score_gemma":0.0012341253,"threshold_uncertainty_score":0.025359929},"labels":[],"label_agreement":null},{"id":"W4408192079","doi":"10.1016/j.autcon.2025.106107","title":"Optimized crane mat design and transit path planning using a graph search algorithm","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Geophysical Methods and Applications","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of Alberta","funders":"","keywords":"Algorithm; Graph; Path (computing); Motion planning; Computer science; Search algorithm; Engineering; Artificial intelligence; Theoretical computer science","score_opus":0.021867651991287058,"score_gpt":0.28985480369509253,"score_spread":0.2679871517038055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408192079","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06966748,0.00017859449,0.9167134,0.00017436387,0.00002799104,0.00017082969,0.00019740764,0.0011707962,0.011699185],"genre_scores_gemma":[0.42779207,0.00016390886,0.56665826,0.00006582113,0.000010427186,0.00018985766,0.00032206377,0.00020311995,0.0045944992],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998536,0.00003596936,0.0000047717213,0.00004372462,0.00003349035,0.000028428287],"domain_scores_gemma":[0.999731,0.0001742147,0.000022638767,0.0000152001085,0.000042519645,0.000014437486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021784061,0.00083587965,0.00045646905,0.00087239296,0.00038838605,0.0005091315,0.0005588982,0.0006969808,0.0045027356],"category_scores_gemma":[0.0008157786,0.00040589154,0.00050050206,0.0007950129,0.00049991655,0.0005288475,0.00036840732,0.00043707437,0.0003805825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033259523,0.000037288028,0.00045117058,0.00003920032,0.000010475259,0.000037795486,0.000028093544,0.96369594,0.002015963,0.0034288552,0.0008798797,0.029342059],"study_design_scores_gemma":[0.000017489205,0.00002943547,0.00011446246,0.000003817388,0.0000056039503,0.000010647613,0.000021213264,0.99712354,0.0006259644,0.0013007768,0.0007433994,0.0000036704982],"about_ca_topic_score_codex":0.020129967,"about_ca_topic_score_gemma":0.033216245,"teacher_disagreement_score":0.020129967,"about_ca_system_score_codex":0.000943275,"about_ca_system_score_gemma":0.0022540842,"threshold_uncertainty_score":0.04002559},"labels":[],"label_agreement":null},{"id":"W4408749021","doi":"10.1016/j.autcon.2025.106130","title":"Safety-constrained Deep Reinforcement Learning control for human–robot collaboration in construction","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Campbell Soup Company; Natural Sciences and Engineering Research Council of Canada; China Scholarship Council","keywords":"Reinforcement learning; Control (management); Artificial intelligence; Robot; Reinforcement; Engineering; Computer science; Construction site safety; Human–computer interaction; Construction engineering; Structural engineering","score_opus":0.027636012050763967,"score_gpt":0.4358170557865518,"score_spread":0.4081810437357878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408749021","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06820588,0.0003871861,0.9267034,0.0003581689,0.00009049858,0.00004925158,0.00004596035,0.00046881166,0.0036908775],"genre_scores_gemma":[0.9820331,0.00004845419,0.016059311,0.000063580046,0.000018674662,0.00004676114,0.000033910583,0.000024966233,0.0016711332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956316,0.00012006269,0.00001489186,0.00011610137,0.000077899065,0.000107841406],"domain_scores_gemma":[0.9985941,0.00075618736,0.00016685833,0.00008681894,0.00026115685,0.00013477438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012130325,0.0007600865,0.0008801265,0.00022870547,0.00049688725,0.0006338653,0.0011768439,0.0012795482,0.0022799908],"category_scores_gemma":[0.002706044,0.00049834704,0.00037147716,0.00018528017,0.0009965455,0.000684098,0.0017957499,0.0015380225,0.00026014997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012615112,0.00007375318,0.00042092704,0.00004170724,0.000020905423,0.00004158396,0.00006851383,0.97109973,0.001495287,0.0026612708,0.0005985867,0.023351554],"study_design_scores_gemma":[0.000004985527,0.000019523502,0.000056093653,0.000002251585,0.0000018809217,0.00000252889,0.000003536138,0.99887687,0.00015376002,0.00081437395,0.00006264578,0.0000016169839],"about_ca_topic_score_codex":0.010538241,"about_ca_topic_score_gemma":0.009264905,"teacher_disagreement_score":0.010538241,"about_ca_system_score_codex":0.0008932073,"about_ca_system_score_gemma":0.0015198317,"threshold_uncertainty_score":0.020953834},"labels":[],"label_agreement":null},{"id":"W4409310266","doi":"10.1016/j.autcon.2025.106180","title":"Deep learning-driven multi-level data fusion framework for predictive maintenance and structural health monitoring of concrete bridge decks","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Portage College","funders":"","keywords":"Bridge (graph theory); Structural health monitoring; Engineering; Computer science; Sensor fusion; Structural engineering; Forensic engineering; Civil engineering; Artificial intelligence; Data mining; Construction engineering; Medicine","score_opus":0.025596878112403517,"score_gpt":0.30500198551480634,"score_spread":0.2794051074024028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409310266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09322772,0.0009008885,0.9014185,0.00035384428,0.00009820805,0.000039199298,0.00060903095,0.0019027556,0.0014497974],"genre_scores_gemma":[0.9191894,0.0002888734,0.07690269,0.00015098593,0.0000660092,0.0000663521,0.0011558996,0.000051009847,0.0021288337],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996848,0.000038432336,0.00001765403,0.00010304329,0.00008302469,0.00007298353],"domain_scores_gemma":[0.9997669,0.00006287519,0.000031702704,0.000027358177,0.00009205733,0.000019176034],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005847424,0.00077431253,0.00093476265,0.0008363899,0.00026904812,0.0006187414,0.0011385428,0.00079334574,0.0010457684],"category_scores_gemma":[0.0008556894,0.0003638236,0.00087906787,0.0008619739,0.00028178812,0.0008959698,0.0010443367,0.0011594086,0.00039436822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003523691,0.00036867845,0.005184566,0.000113900984,0.00017181602,0.00016852655,0.00009176183,0.57686013,0.020766532,0.0030157857,0.0043535708,0.38855234],"study_design_scores_gemma":[0.0000024739336,0.00001922769,0.0006522126,0.0000029414855,0.000009073886,0.000009149668,0.0000062341123,0.9969523,0.0011457986,0.0009868259,0.00020984294,0.000003970038],"about_ca_topic_score_codex":0.008526931,"about_ca_topic_score_gemma":0.0122608645,"teacher_disagreement_score":0.008526931,"about_ca_system_score_codex":0.0005468029,"about_ca_system_score_gemma":0.00086520944,"threshold_uncertainty_score":0.0169546},"labels":[],"label_agreement":null},{"id":"W4409379681","doi":"10.1016/j.autcon.2025.106160","title":"Temporal defect point localization in pipe CCTV videos with transformers","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Video Analysis and Summarization","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wave Control Systems (Canada)","funders":"National Key Research and Development Program of China; Natural Science Foundation of Tianjin City","keywords":"Transformer; Computer vision; Point (geometry); Artificial intelligence; Computer science; Engineering; Computer graphics (images); Engineering drawing; Electrical engineering; Mathematics; Geometry; Voltage","score_opus":0.0038751392739097973,"score_gpt":0.21713021418574371,"score_spread":0.21325507491183393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409379681","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.702035,0.00072365225,0.28676295,0.00034649565,0.00013176794,0.000086399865,0.001925793,0.0015982063,0.006389723],"genre_scores_gemma":[0.9570614,0.0004291354,0.03949356,0.000035058074,0.00005755841,0.00001961863,0.00094988453,0.00009265546,0.0018611925],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998276,0.000017282973,0.0000062477056,0.000027894012,0.00008488793,0.00003612078],"domain_scores_gemma":[0.9994999,0.00011790605,0.00007774052,0.000048247584,0.00021783206,0.0000383878],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020989109,0.00037168316,0.00020581187,0.0015051614,0.00019513346,0.00054500357,0.00026402177,0.00046518844,0.0013851613],"category_scores_gemma":[0.0010836801,0.00014922387,0.0001545463,0.0013451255,0.00022696414,0.0005407994,0.00033445677,0.00040753136,0.00036118852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016770486,0.00014544878,0.01666865,0.00061400543,0.000054357024,0.0016753597,0.0006734661,0.04795084,0.41817963,0.0028950765,0.009928032,0.499538],"study_design_scores_gemma":[0.00004229964,0.0003244091,0.12364546,0.00013466332,0.00010603305,0.0019361888,0.000984714,0.6775032,0.18437934,0.0024012069,0.008475844,0.00006661552],"about_ca_topic_score_codex":0.006720735,"about_ca_topic_score_gemma":0.007277583,"teacher_disagreement_score":0.006720735,"about_ca_system_score_codex":0.0003111437,"about_ca_system_score_gemma":0.00037378207,"threshold_uncertainty_score":0.013363183},"labels":[],"label_agreement":null},{"id":"W4409978586","doi":"10.1016/j.autcon.2025.106198","title":"Simulation as a decision-support tool in construction project management: Simphony-Dynamic-as-a-Service","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Decision support system; Service (business); Construction management; Engineering; Engineering management; Process management; Project management; Computer science; Construction engineering; Systems engineering; Operations research; Operations management; Business; Civil engineering; Artificial intelligence","score_opus":0.005636206337668867,"score_gpt":0.2614255933201834,"score_spread":0.2557893869825145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409978586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13157791,0.00041285172,0.82680166,0.00092902634,0.00024189828,0.00020093394,0.0003697091,0.0066103823,0.032855608],"genre_scores_gemma":[0.8725062,0.00033895482,0.12149283,0.00015136953,0.00003783188,0.00016177393,0.00025512264,0.00031236227,0.0047435276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990571,0.00055404665,0.00004736471,0.00008693096,0.00019435034,0.000060174723],"domain_scores_gemma":[0.99851924,0.0009577764,0.00005537296,0.00015875054,0.00018124575,0.00012764178],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014363616,0.0005517953,0.000567469,0.00059781177,0.00051963615,0.0018526124,0.0009325906,0.0009527634,0.007870758],"category_scores_gemma":[0.0023402448,0.00031562854,0.00039517132,0.000633044,0.0006629457,0.0013488819,0.0013830193,0.0007463966,0.000900137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014602933,0.0008290978,0.004747255,0.00025434745,0.000113925795,0.00036437588,0.0011472175,0.6669462,0.011747669,0.05594788,0.006852714,0.2495891],"study_design_scores_gemma":[0.00007088276,0.00012197658,0.00039456316,0.000039032897,0.000023407578,0.000057304536,0.000122033365,0.97847056,0.0038030704,0.008362579,0.008508551,0.00002605518],"about_ca_topic_score_codex":0.005027066,"about_ca_topic_score_gemma":0.002947502,"teacher_disagreement_score":0.007870758,"about_ca_system_score_codex":0.0006971891,"about_ca_system_score_gemma":0.0012005233,"threshold_uncertainty_score":0.026330352},"labels":[],"label_agreement":null},{"id":"W4410219594","doi":"10.1016/j.autcon.2025.106252","title":"Rebar grasp detection using a synthetic model generator and domain randomization","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Robot Manipulation and Learning","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Precast/Prestressed Concrete Institute; McGill University; Princeton University","keywords":"GRASP; Rebar; Generator (circuit theory); Randomization; Domain (mathematical analysis); Computer science; Engineering; Artificial intelligence; Engineering drawing; Structural engineering; Mathematics; Power (physics); Programming language; Medicine; Physics; Clinical trial","score_opus":0.008215319076667293,"score_gpt":0.22037337936792237,"score_spread":0.21215806029125509,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410219594","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2181141,0.00042619658,0.7638171,0.00031395542,0.00013331625,0.000352589,0.0021704168,0.011693968,0.0029783354],"genre_scores_gemma":[0.65325296,0.00023319152,0.33557516,0.00019334818,0.000023354283,0.00046513358,0.0067216824,0.00080159557,0.0027334993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995783,0.000085457934,0.000021781309,0.00016739943,0.00009891507,0.00004817036],"domain_scores_gemma":[0.9990928,0.00043003212,0.000092305665,0.00022023104,0.00012233449,0.000042355994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007981502,0.0012579586,0.00055020297,0.00087798346,0.00026571675,0.00088756264,0.0014023148,0.001145318,0.0018096708],"category_scores_gemma":[0.0025029536,0.00045117963,0.0010024665,0.0005443227,0.0005126909,0.00081111735,0.0010519405,0.00091169286,0.0008477451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034217382,0.00018630052,0.0036713516,0.00025651598,0.00007258283,0.00037032392,0.00012302585,0.8474343,0.031415228,0.003254302,0.005355218,0.107518665],"study_design_scores_gemma":[0.000011779573,0.000052368112,0.00038672052,0.000009498338,0.000005148269,0.000070558504,0.000023161214,0.98794484,0.009161731,0.0010880831,0.001235917,0.000010220693],"about_ca_topic_score_codex":0.0026930342,"about_ca_topic_score_gemma":0.00431306,"teacher_disagreement_score":0.0026930342,"about_ca_system_score_codex":0.0006006889,"about_ca_system_score_gemma":0.0007213579,"threshold_uncertainty_score":0.0060539246},"labels":[],"label_agreement":null},{"id":"W4411025022","doi":"10.1016/j.autcon.2025.106311","title":"Advancing polymer composites in civil infrastructure through 3D printing","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"University of Southern Queensland","keywords":"3D printing; Civil infrastructure; Composite material; Materials science; Polymer; Engineering; Civil engineering; Construction engineering","score_opus":0.003094327295182738,"score_gpt":0.22487324585165305,"score_spread":0.2217789185564703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411025022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2850027,0.1591518,0.3567645,0.0014403085,0.0017298608,0.00036081308,0.0015193449,0.0038868142,0.1901438],"genre_scores_gemma":[0.69032604,0.10751094,0.17833938,0.00055976876,0.00022315339,0.00019377902,0.00057755865,0.0003693278,0.021900062],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996623,0.00003812861,0.000023426152,0.00005432576,0.00018747686,0.00003431642],"domain_scores_gemma":[0.9998317,0.00007193129,0.0000303099,0.000026397414,0.000028600147,0.000011097813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035795633,0.0004684102,0.00031308437,0.00083404686,0.00024159462,0.0012342229,0.0003392043,0.0006852088,0.0030951824],"category_scores_gemma":[0.0004257547,0.00035496725,0.00062374194,0.0007266769,0.00039088284,0.0008939796,0.0007633239,0.0010540717,0.0016744304],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006315601,0.00008577764,0.00041816625,0.0036542327,0.0000419623,0.0009148062,0.00028602965,0.010453768,0.789305,0.020211618,0.0029279033,0.17163762],"study_design_scores_gemma":[0.00001271125,0.00021661667,0.0011943398,0.00027482575,0.00005813768,0.0014231887,0.000106933294,0.008222517,0.756701,0.0036886358,0.22803852,0.00006244048],"about_ca_topic_score_codex":0.00030291738,"about_ca_topic_score_gemma":0.00090512645,"teacher_disagreement_score":0.0030951824,"about_ca_system_score_codex":0.00033203082,"about_ca_system_score_gemma":0.00030722888,"threshold_uncertainty_score":0.0103544},"labels":[],"label_agreement":null},{"id":"W4412449064","doi":"10.1016/j.autcon.2025.106378","title":"Automatic floor plan analysis: Datasets, methods, and applications (2000–2025)","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Floor plan; Computer science; Engineering; Data science; Engineering drawing; Geography; Archaeology","score_opus":0.01562806258261894,"score_gpt":0.2930152698860629,"score_spread":0.27738720730344396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412449064","genre_codex":"dataset","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07597014,0.0008911403,0.034737382,0.0004553444,0.0003799623,0.0005651488,0.85857004,0.01686777,0.011563043],"genre_scores_gemma":[0.030695679,0.00020667697,0.036480796,0.000054782806,0.00003272535,0.00041925098,0.9283603,0.00034525606,0.0034045668],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980275,0.0002161338,0.00020548735,0.00034740206,0.0010013522,0.0002020301],"domain_scores_gemma":[0.99474263,0.0005004165,0.00037917265,0.0015192962,0.0024983233,0.00036017687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002164256,0.0012527286,0.00057343213,0.005171606,0.0007179935,0.0010893672,0.0013872947,0.0008376936,0.0055921227],"category_scores_gemma":[0.0053049335,0.00065375573,0.0008765161,0.0062185396,0.00048533524,0.0010833797,0.0015957002,0.0008974911,0.010195894],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001024896,0.0005772113,0.040015277,0.00059150247,0.00020349435,0.00014724776,0.00016798705,0.017332597,0.0056919865,0.0013494316,0.61116475,0.32173365],"study_design_scores_gemma":[0.00039497289,0.00032989908,0.33106902,0.00034753818,0.00020141955,0.0005630425,0.0005514406,0.08632026,0.032503452,0.0038920927,0.54364127,0.00018561477],"about_ca_topic_score_codex":0.047862962,"about_ca_topic_score_gemma":0.06504048,"teacher_disagreement_score":0.047862962,"about_ca_system_score_codex":0.0012365574,"about_ca_system_score_gemma":0.0022751733,"threshold_uncertainty_score":0.09516871},"labels":[],"label_agreement":null},{"id":"W4412670856","doi":"10.1016/j.autcon.2025.106429","title":"Architecture of tomorrow: The construction industry in the era of artificial intelligence","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Architecture; Engineering; Artificial intelligence; Construction industry; Architectural engineering; Engineering management; Computer science; Construction engineering; Manufacturing engineering; Art; Visual arts","score_opus":0.00922128614498672,"score_gpt":0.2375733588344598,"score_spread":0.22835207268947308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412670856","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.105698824,0.028202862,0.033503324,0.10350702,0.0020215507,0.00006641533,0.0004970316,0.00079301983,0.72571],"genre_scores_gemma":[0.8323395,0.0103477705,0.03190298,0.0037088273,0.00027222288,0.000058951435,0.00037655677,0.00031035658,0.12068285],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999368,0.00020869813,0.000015903048,0.00009732596,0.0001583595,0.00015175597],"domain_scores_gemma":[0.9996884,0.000025990457,0.000018086646,0.00004414671,0.00006729252,0.00015608559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085604953,0.0005832932,0.00025395487,0.0012034143,0.005168658,0.0076167,0.00077547744,0.0017337252,0.013821807],"category_scores_gemma":[0.0006823816,0.00030246776,0.00031188587,0.0022468122,0.0067231385,0.0062093935,0.0036912465,0.002791897,0.0012694316],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056311044,0.000022901579,0.002354731,0.000051732797,0.000015937445,0.00021813436,0.0060570813,0.0015198793,0.0010798187,0.90895444,0.032171305,0.047497742],"study_design_scores_gemma":[0.0000072268876,0.000033363613,0.0046404954,0.0001714712,0.000016097778,0.00024077122,0.008143345,0.0016716652,0.0004383977,0.15954104,0.82506555,0.000030624084],"about_ca_topic_score_codex":0.12679206,"about_ca_topic_score_gemma":0.26658818,"teacher_disagreement_score":0.12679206,"about_ca_system_score_codex":0.01021775,"about_ca_system_score_gemma":0.009469513,"threshold_uncertainty_score":0.2521081},"labels":[],"label_agreement":null},{"id":"W4412852818","doi":"10.1016/j.autcon.2025.106432","title":"Feasibility of VR-generated synthetic data for automated productivity monitoring in modular construction","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Agency for Infrastructure Technology Advancement; Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Productivity; Computer science; Modular construction; Engineering; Engineering drawing; Systems engineering; Data science; Operating system","score_opus":0.05414816831602172,"score_gpt":0.30036855717001987,"score_spread":0.24622038885399816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412852818","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6048402,0.00020810612,0.38233492,0.00026197731,0.00013118393,0.00012866846,0.0024030926,0.002993245,0.0066986005],"genre_scores_gemma":[0.93357915,0.000060933533,0.064771995,0.000024892483,0.000009951282,0.000045817997,0.0010432446,0.000090443296,0.00037357977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954283,0.00015210624,0.000016984972,0.00006779957,0.00018145282,0.00003872498],"domain_scores_gemma":[0.99876666,0.00057567365,0.00007513131,0.0002045415,0.00033441617,0.000043546326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006198354,0.00041859373,0.00027478038,0.00074505777,0.0001462524,0.0008159812,0.0005679982,0.0005594336,0.0021143376],"category_scores_gemma":[0.0025411074,0.00022548706,0.00033199348,0.00078524905,0.00027306585,0.0005771456,0.00041899557,0.00032463294,0.00048612652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016638085,0.00050353375,0.015877664,0.00049057155,0.00009629923,0.00047191908,0.00071111193,0.4179378,0.20452695,0.0031872578,0.0035533225,0.35097966],"study_design_scores_gemma":[0.00007771238,0.0003081623,0.010909077,0.000031648553,0.000038059912,0.00014441431,0.00022483755,0.9447055,0.038314242,0.001194605,0.0040078205,0.00004393652],"about_ca_topic_score_codex":0.0019259535,"about_ca_topic_score_gemma":0.00175453,"teacher_disagreement_score":0.0021143376,"about_ca_system_score_codex":0.00025600693,"about_ca_system_score_gemma":0.0004341539,"threshold_uncertainty_score":0.0070731044},"labels":[],"label_agreement":null},{"id":"W4413120239","doi":"10.1016/j.autcon.2025.106434","title":"Robotic ground vehicle for acoustic data acquisition on construction sites","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Modular Robots and Swarm Intelligence","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Inro Consultants (Canada); Polytechnique Montréal","funders":"Mitacs","keywords":"Data acquisition; Engineering; Computer science; Acoustics; Physics; Operating system","score_opus":0.026145874672103202,"score_gpt":0.2757962816187402,"score_spread":0.249650406946637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413120239","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4293829,0.00037236133,0.55433375,0.00014464623,0.00015729434,0.0004459728,0.0007831629,0.004809566,0.009570302],"genre_scores_gemma":[0.8845031,0.00012633891,0.10935208,0.000055749373,0.000016631591,0.00032986075,0.0007757167,0.00007474205,0.0047656847],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99953485,0.00008308289,0.000012323215,0.000088839595,0.00023324271,0.000047826245],"domain_scores_gemma":[0.99960226,0.00006532435,0.000056604393,0.00009309597,0.00014916941,0.00003358622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041087947,0.00043018968,0.0004082548,0.00060271623,0.00027830226,0.00037373256,0.0006881685,0.00031454198,0.002719217],"category_scores_gemma":[0.0005773616,0.00015300231,0.00017846996,0.00046180788,0.00025970984,0.0005138769,0.0007147384,0.0002653378,0.0012457846],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047230127,0.00024192642,0.012283695,0.0005531256,0.00006571737,0.00037309693,0.00053685706,0.033077475,0.4160421,0.0031968465,0.0067038913,0.526453],"study_design_scores_gemma":[0.0002286243,0.0035444233,0.08261468,0.00015928478,0.00013200527,0.0010517043,0.0015226097,0.46266726,0.3345919,0.004709532,0.108575806,0.00020218533],"about_ca_topic_score_codex":0.0016954432,"about_ca_topic_score_gemma":0.0024521647,"teacher_disagreement_score":0.002719217,"about_ca_system_score_codex":0.0002540641,"about_ca_system_score_gemma":0.00075351546,"threshold_uncertainty_score":0.009096682},"labels":[],"label_agreement":null},{"id":"W4413882907","doi":"10.1016/j.autcon.2025.106496","title":"AI applications for structural design automation","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Automation; Engineering; Systems engineering; Computer science; Software engineering; Manufacturing engineering; Engineering drawing; Mechanical engineering","score_opus":0.008366985701120627,"score_gpt":0.25174391815064023,"score_spread":0.2433769324495196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413882907","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056646075,0.61594707,0.24160124,0.003375275,0.00102098,0.00034231695,0.0006213415,0.0010842367,0.130343],"genre_scores_gemma":[0.12183911,0.55227333,0.30514848,0.0022292226,0.00095327524,0.0006200129,0.0012767587,0.00030767743,0.015352172],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957789,0.0013812599,0.00038395156,0.00037954174,0.0019856538,0.00009076064],"domain_scores_gemma":[0.990931,0.0069204313,0.0005036817,0.00046121448,0.0011026955,0.000081007245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029843408,0.001067347,0.00080518203,0.0048036487,0.0006764821,0.002634722,0.0014011667,0.0015262084,0.014857254],"category_scores_gemma":[0.009651607,0.00053038663,0.0014027961,0.005519441,0.0013652893,0.0028075143,0.0017124979,0.0013425607,0.0036038514],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004810746,0.000060872306,0.0011277247,0.02293077,0.00020310497,0.00024500233,0.00072701153,0.0069311946,0.0051647127,0.08243754,0.010986874,0.8691371],"study_design_scores_gemma":[0.00002356996,0.00015470838,0.0024905575,0.010540788,0.00020491563,0.0012026046,0.0005815014,0.0056210565,0.0043640025,0.09665053,0.8780955,0.00007018889],"about_ca_topic_score_codex":0.0011755583,"about_ca_topic_score_gemma":0.002095797,"teacher_disagreement_score":0.014857254,"about_ca_system_score_codex":0.0011238214,"about_ca_system_score_gemma":0.001955718,"threshold_uncertainty_score":0.049702466},"labels":[],"label_agreement":null},{"id":"W4414113226","doi":"10.1016/j.autcon.2025.106505","title":"Dual-stream transformer-based activity classification for off-site construction productivity analysis","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Forestry Promotion Institute; Korea Agency for Infrastructure Technology Advancement; Korea Forest Service; Ministry of Land, Infrastructure and Transport","keywords":"Productivity; Production (economics); Automation; Statistical analysis; Construction industry","score_opus":0.010258749328550172,"score_gpt":0.24494372053748803,"score_spread":0.23468497120893786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414113226","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07400587,0.00019213004,0.919406,0.000096646654,0.000037423637,0.00010659467,0.0006492561,0.0030956308,0.0024103774],"genre_scores_gemma":[0.83321786,0.00025561394,0.16218887,0.00005038427,0.000036152014,0.00011771125,0.0015274711,0.00010251216,0.0025034607],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960047,0.000032323253,0.000018382612,0.00012264014,0.000154674,0.000071534196],"domain_scores_gemma":[0.9996062,0.00008205583,0.000078273806,0.000042142314,0.0001499831,0.000041326974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040497672,0.0009119058,0.00064794207,0.003187478,0.00016260488,0.00081089523,0.0011557335,0.00045720607,0.0015167609],"category_scores_gemma":[0.0011363779,0.0002540573,0.00065448484,0.0018687902,0.0002477109,0.00085617066,0.0007124093,0.00050690403,0.00087443314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040168592,0.00056872866,0.031238824,0.00018126429,0.00010758447,0.00024979093,0.00015455019,0.18769565,0.025149338,0.0030829625,0.004258133,0.74691147],"study_design_scores_gemma":[0.000005884815,0.000041437215,0.0048613898,0.000007335744,0.00001638537,0.0000635437,0.000041259213,0.98764056,0.0051588956,0.0012903113,0.00086405536,0.000008862878],"about_ca_topic_score_codex":0.008304115,"about_ca_topic_score_gemma":0.011440428,"teacher_disagreement_score":0.008304115,"about_ca_system_score_codex":0.00078121386,"about_ca_system_score_gemma":0.00079714,"threshold_uncertainty_score":0.01651156},"labels":[],"label_agreement":null},{"id":"W4414675845","doi":"10.1016/j.autcon.2025.106562","title":"ControlNet-based domain adaptation for synthetic construction images via graphical simulation and generative AI","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Image Processing and 3D Reconstruction","field":"Computer Science","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Hyperparameter; Synthetic data; Generative grammar; Artificial neural network; Adaptation (eye); Domain (mathematical analysis); Representation (politics); Architecture","score_opus":0.007687378988239925,"score_gpt":0.2659110875364778,"score_spread":0.2582237085482379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414675845","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031400204,0.00006669622,0.96035075,0.00009077184,0.000035103098,0.00003837376,0.0000518613,0.0018818468,0.0060845087],"genre_scores_gemma":[0.87833714,0.00007135383,0.11802672,0.00008035766,0.000013902916,0.000079975165,0.00016997609,0.00034384136,0.0028767306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997924,0.00005445977,0.0000073790284,0.000055507735,0.00006069635,0.000029577373],"domain_scores_gemma":[0.99950254,0.00027561217,0.00003107158,0.00007684601,0.00008763627,0.000026239608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047206294,0.000577677,0.0005758086,0.0006303038,0.00029756894,0.00073704775,0.00094167027,0.0007411032,0.0035427795],"category_scores_gemma":[0.0016211964,0.00033935404,0.00063171017,0.0004040011,0.0007590251,0.0006233363,0.0010540482,0.0007782788,0.0005014486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000072573894,0.000039604696,0.00027636052,0.000030212474,0.000019222138,0.000057967387,0.00006520407,0.945081,0.0049210642,0.007398299,0.0005599902,0.041478403],"study_design_scores_gemma":[0.0000018938343,0.0000041395847,0.000024669054,0.0000012295288,0.0000014061386,0.0000056104273,0.0000031132085,0.9980332,0.0005916921,0.0011652032,0.00016638143,0.0000014409841],"about_ca_topic_score_codex":0.006285615,"about_ca_topic_score_gemma":0.0061688423,"teacher_disagreement_score":0.006285615,"about_ca_system_score_codex":0.0006214698,"about_ca_system_score_gemma":0.000565664,"threshold_uncertainty_score":0.012498021},"labels":[],"label_agreement":null},{"id":"W4415269933","doi":"10.1016/j.autcon.2025.106610","title":"Message-passing framework for multi-camera worker tracking in construction","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Elevator Systems and Control","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hudbay Minerals (Canada)","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; Ministry of Land, Infrastructure and Transport; Chung-Ang University","keywords":"Benchmark (surveying); Discriminative model; Cluster analysis; Trajectory; Tracking (education); Field (mathematics); Tracking system; Feature (linguistics); Motion (physics)","score_opus":0.013759826352706199,"score_gpt":0.27609655615073314,"score_spread":0.26233672979802697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415269933","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029015807,0.00007883644,0.99302846,0.00003744107,0.00002118158,0.000023398607,0.000063076484,0.0034299819,0.00041603376],"genre_scores_gemma":[0.3467299,0.0003490197,0.6437704,0.00010803282,0.00007672307,0.00021726232,0.0006979592,0.0006596534,0.007391048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875677,0.00025251208,0.000083060026,0.00027047403,0.00040908615,0.00022808627],"domain_scores_gemma":[0.998872,0.00037750343,0.000100856836,0.00029907524,0.00026149995,0.000089090514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017109172,0.0010288708,0.0015291418,0.0007873864,0.0011069931,0.002108342,0.0032239673,0.0017256308,0.0040414003],"category_scores_gemma":[0.0023376502,0.00075850013,0.0012863084,0.00085065403,0.00067323993,0.002531458,0.0023851276,0.0019672473,0.0014797703],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011504402,0.00037296003,0.0028147306,0.00055072526,0.00025340499,0.00051413977,0.0010193317,0.46670437,0.022800375,0.10791921,0.012467606,0.38343263],"study_design_scores_gemma":[0.000026526941,0.00004447204,0.00020890003,0.000015024229,0.000031198302,0.000046525205,0.000037602094,0.97521734,0.0068223467,0.0122403195,0.0052901027,0.00001960856],"about_ca_topic_score_codex":0.014573187,"about_ca_topic_score_gemma":0.010464009,"teacher_disagreement_score":0.014573187,"about_ca_system_score_codex":0.0011502681,"about_ca_system_score_gemma":0.0020743534,"threshold_uncertainty_score":0.028976738},"labels":[],"label_agreement":null},{"id":"W4415532727","doi":"10.1016/j.autcon.2025.106615","title":"Dynamic recovery from disruptions in prefabricated supply chains considering delay effects","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Supply Chain Resilience and Risk Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Supply chain; Subsidy; Mode (computer interface); Differential game; Differential (mechanical device); Energy recovery","score_opus":0.0056640635109156375,"score_gpt":0.23289686388980463,"score_spread":0.227232800378889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415532727","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9102828,0.00026263524,0.08549729,0.000268071,0.000048979782,0.000027599648,0.00008351088,0.00009858763,0.0034305581],"genre_scores_gemma":[0.998495,0.00003924021,0.00082498824,0.000003661748,0.000002720526,0.0000031473928,0.000016372955,0.000004169725,0.00061078457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970216,0.000055227585,0.000012053918,0.00006236573,0.000046759025,0.00012151257],"domain_scores_gemma":[0.99879503,0.0005604425,0.000273359,0.0000682401,0.00018878623,0.0001140231],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006657724,0.0005637358,0.00058571744,0.0006844309,0.0006228766,0.0014105359,0.00073109847,0.0010254948,0.0021910998],"category_scores_gemma":[0.002833807,0.0003338585,0.00049109326,0.000808129,0.00070097565,0.0013969523,0.0008972312,0.00072131015,0.00010692967],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104760344,0.000022559423,0.0022398194,0.000019239098,0.000018168128,0.00024082394,0.000065062624,0.9902615,0.0009414859,0.0021250073,0.00010689463,0.0038547725],"study_design_scores_gemma":[0.000005189886,0.000049050217,0.0015370769,0.000005802168,0.000019379406,0.000025043248,0.00014951761,0.99549806,0.00042856846,0.0021383215,0.0001338299,0.000010265045],"about_ca_topic_score_codex":0.021058658,"about_ca_topic_score_gemma":0.01050795,"teacher_disagreement_score":0.021058658,"about_ca_system_score_codex":0.0010736958,"about_ca_system_score_gemma":0.00084506464,"threshold_uncertainty_score":0.041872144},"labels":[],"label_agreement":null},{"id":"W4415826776","doi":"10.1016/j.autcon.2025.106630","title":"Automated performance measurement and benchmarking in emergency healthcare facility projects","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Facility Location and Emergency Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Hong Kong Polytechnic University; Research Grants Council, University Grants Committee","keywords":"Benchmarking; Cloud computing; Performance measurement; Health care; Performance improvement; Performance indicator; Automation","score_opus":0.0306296674146422,"score_gpt":0.25530160259087115,"score_spread":0.22467193517622894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415826776","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9777058,0.00035471242,0.016114967,0.0002645849,0.000028951627,0.00006788107,0.00025236997,0.00020343252,0.005007428],"genre_scores_gemma":[0.9975217,0.000045770623,0.0021455127,0.0000055162623,0.0000060907896,0.000017480577,0.00011705731,0.0000053712856,0.00013555802],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9837235,0.010399805,0.0007674177,0.00074747286,0.0035385059,0.0008233465],"domain_scores_gemma":[0.9678084,0.016320713,0.005437721,0.0022157324,0.0074012163,0.00081623247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009833486,0.0004124437,0.00045218092,0.0032854413,0.00061050354,0.0020371452,0.00077872537,0.0006895728,0.00068549265],"category_scores_gemma":[0.032473996,0.00020220346,0.00025233993,0.005581338,0.00054566376,0.0018463017,0.0009949622,0.00050298835,0.00016696787],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011859845,0.0011641674,0.3746808,0.00026844503,0.00021546149,0.00020801512,0.0028002963,0.18985263,0.0025613627,0.011858798,0.0038339389,0.4113701],"study_design_scores_gemma":[0.00007047735,0.0018375133,0.44714028,0.00014752237,0.00007467477,0.0001461297,0.0036976826,0.5287171,0.004621661,0.008622167,0.0048360624,0.00008877452],"about_ca_topic_score_codex":0.009714925,"about_ca_topic_score_gemma":0.0062550833,"teacher_disagreement_score":0.009833486,"about_ca_system_score_codex":0.0025478313,"about_ca_system_score_gemma":0.0020433452,"threshold_uncertainty_score":0.052005053},"labels":[],"label_agreement":null},{"id":"W4415878985","doi":"10.1016/j.autcon.2025.106644","title":"Automating clash relevance filtering in BIM-based multidisciplinary coordination using machine learning","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Metadata; Context (archaeology); Identification (biology); Process (computing); Relevance (law); Software; Building information modeling; Quality (philosophy)","score_opus":0.009241363043894509,"score_gpt":0.24783937004757484,"score_spread":0.23859800700368033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415878985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029348593,0.00008122966,0.9604908,0.00019081791,0.00003579131,0.00021478227,0.00008320094,0.007296607,0.0022580565],"genre_scores_gemma":[0.35130557,0.00008825579,0.6445582,0.00014292265,0.000024700788,0.0001873998,0.0005094993,0.0006020643,0.0025814576],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9947207,0.001312795,0.00034106433,0.0011823621,0.0020920206,0.00035116292],"domain_scores_gemma":[0.99142104,0.003013409,0.00091560505,0.0023589577,0.0019971854,0.00029374353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073774303,0.0011077663,0.00145722,0.004020148,0.0016131748,0.0033101598,0.0024228757,0.0012340301,0.0032750864],"category_scores_gemma":[0.01474814,0.0008796687,0.0012174607,0.0021957995,0.0011967334,0.0035399694,0.005724069,0.0015466352,0.0018574604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041091014,0.00048120276,0.015246576,0.00044337072,0.00011824114,0.0002868158,0.003224745,0.09019983,0.026642362,0.00821849,0.0051707565,0.8495566],"study_design_scores_gemma":[0.00004836319,0.00021087278,0.010715,0.0001383485,0.00006453836,0.00027126484,0.0015968243,0.900075,0.048048813,0.020312823,0.0184187,0.000099432145],"about_ca_topic_score_codex":0.006506643,"about_ca_topic_score_gemma":0.009849614,"teacher_disagreement_score":0.0073774303,"about_ca_system_score_codex":0.0014924194,"about_ca_system_score_gemma":0.0031410782,"threshold_uncertainty_score":0.039016068},"labels":[],"label_agreement":null},{"id":"W4416523535","doi":"10.1016/j.autcon.2025.106669","title":"Assembly sequence planning method for robotic timber wall prefabrication","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Prefabrication; Component (thermodynamics); Robot; Key (lock); Sequence (biology); Representation (politics); Relation (database); Framing (construction)","score_opus":0.022717265950117867,"score_gpt":0.32042428173327087,"score_spread":0.297707015783153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416523535","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067751994,0.00005572768,0.99049723,0.00001830405,0.000019866698,0.000032184587,0.000034448538,0.00032650155,0.0022404422],"genre_scores_gemma":[0.23877338,0.00018639286,0.75239116,0.00003491776,0.000017509028,0.00017134444,0.0002506313,0.00013282549,0.008041822],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998036,0.000020730013,0.000010329221,0.00006219517,0.000080219324,0.000022907245],"domain_scores_gemma":[0.99989593,0.000041768126,0.000010086528,0.0000119592605,0.000033308646,0.0000069659495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019607213,0.00052822,0.00050770264,0.00046023965,0.00052434916,0.00032385334,0.00067591085,0.00041620157,0.004474884],"category_scores_gemma":[0.00028788342,0.00040996334,0.00056958507,0.00051551894,0.00027908798,0.0004010127,0.00039645104,0.00059907575,0.00055853557],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015975618,0.00011075352,0.00051200046,0.0002569109,0.000037448946,0.0003212774,0.00021398852,0.43256474,0.064096615,0.02208461,0.0045349044,0.47510695],"study_design_scores_gemma":[0.000016357837,0.00007545336,0.00030955384,0.0000113287115,0.000015194054,0.00013317922,0.000032679578,0.9788102,0.0108734695,0.0058237985,0.003882236,0.000016591777],"about_ca_topic_score_codex":0.008251735,"about_ca_topic_score_gemma":0.009758541,"teacher_disagreement_score":0.008251735,"about_ca_system_score_codex":0.00035960943,"about_ca_system_score_gemma":0.0010703274,"threshold_uncertainty_score":0.01640737},"labels":[],"label_agreement":null},{"id":"W4416585958","doi":"10.1016/j.autcon.2025.106671","title":"Mobile robotic rebar cage assembly via imitation learning","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Soft Robotics and Applications","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Precast/Prestressed Concrete Institute; McGill University; Princeton University","keywords":"Rebar; Robustness (evolution); Visual servoing; Software portability; Software deployment; Robot; Bottleneck; Robotics","score_opus":0.005043363338728157,"score_gpt":0.232180086151182,"score_spread":0.22713672281245384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416585958","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060803,0.0002825611,0.92937833,0.000100442594,0.000049448325,0.00007824954,0.000032055443,0.004922188,0.0043538064],"genre_scores_gemma":[0.8653636,0.00012170735,0.12911503,0.00008283596,0.000019766538,0.00011287758,0.000092728624,0.00017116935,0.0049202456],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99972934,0.000039213926,0.000009775092,0.000093258255,0.000080224694,0.000048149574],"domain_scores_gemma":[0.9996124,0.000120617304,0.00008206619,0.000098484314,0.000052119594,0.00003436731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030382987,0.00094920944,0.0006058011,0.00023410792,0.0003112493,0.0004205327,0.0011714838,0.0006556823,0.0019976366],"category_scores_gemma":[0.00078999135,0.0003599325,0.00045053457,0.00015234402,0.00075835816,0.00075059396,0.0012403782,0.0006787993,0.0007141879],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029140047,0.00016150517,0.0016007002,0.0002039306,0.000062726926,0.00046793275,0.00023944727,0.602421,0.13096572,0.00631323,0.0024529807,0.2548195],"study_design_scores_gemma":[0.000014191653,0.00017970486,0.0004223534,0.00000966745,0.000009325966,0.00012064216,0.000026499365,0.9802043,0.014911404,0.0016709444,0.0024145928,0.00001643352],"about_ca_topic_score_codex":0.0020111506,"about_ca_topic_score_gemma":0.0021218907,"teacher_disagreement_score":0.0020111506,"about_ca_system_score_codex":0.0003457394,"about_ca_system_score_gemma":0.00047045609,"threshold_uncertainty_score":0.006682813},"labels":[],"label_agreement":null},{"id":"W4416812470","doi":"10.1016/j.autcon.2025.106682","title":"SLAM-centric visual inspection of civil infrastructure","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Visual inspection; Pipeline (software); Software; Trajectory; Point cloud; Lidar; Visualization","score_opus":0.0020060589773950544,"score_gpt":0.21432281586190555,"score_spread":0.2123167568845105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416812470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067747295,0.00019433325,0.91324157,0.000073490744,0.000064779204,0.00013028341,0.001716046,0.011967166,0.004864974],"genre_scores_gemma":[0.68499124,0.00014287009,0.30610767,0.00006524503,0.000017739,0.00022532078,0.005335052,0.00064893404,0.002465948],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990451,0.00017101418,0.00003700441,0.0002076295,0.00041833057,0.000120826575],"domain_scores_gemma":[0.99888307,0.00012007487,0.00013459344,0.0005044793,0.0003109774,0.00004677002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005981791,0.0007117684,0.0005511437,0.0011399068,0.00028831686,0.0009029662,0.0009523079,0.0004893424,0.0019855911],"category_scores_gemma":[0.0024456938,0.00043033963,0.00055338355,0.0011394112,0.00044394447,0.0012368767,0.001760795,0.0006370158,0.0011843854],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005442041,0.0002133631,0.009382707,0.0008666361,0.00014810568,0.00022913235,0.0005413571,0.40564835,0.08098085,0.0060900846,0.016377615,0.47897756],"study_design_scores_gemma":[0.000043616903,0.00023167382,0.013954042,0.00007884425,0.000024754021,0.000254533,0.00021838525,0.9119486,0.048750736,0.005766138,0.01866955,0.000058976366],"about_ca_topic_score_codex":0.0061386563,"about_ca_topic_score_gemma":0.009359745,"teacher_disagreement_score":0.0061386563,"about_ca_system_score_codex":0.0005616024,"about_ca_system_score_gemma":0.0012654671,"threshold_uncertainty_score":0.012205839},"labels":[],"label_agreement":null},{"id":"W4417465952","doi":"10.1016/j.autcon.2025.106731","title":"Indoor scan-to-BIM automation: From mobile perception to 3D building modelling","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"China Scholarship Council; National Natural Science Foundation of China; Ontario Ministry of Natural Resources and Forestry","keywords":"Benchmarking; Bridging (networking); Point cloud; Benchmark (surveying); Building information modeling; Identification (biology); Key (lock); Resource (disambiguation)","score_opus":0.013489452440713595,"score_gpt":0.24643438270186444,"score_spread":0.23294493026115085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417465952","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018935423,0.00038518055,0.9680462,0.00010977948,0.000057541976,0.00005530065,0.00045858248,0.007893302,0.0040586083],"genre_scores_gemma":[0.53263754,0.000802607,0.45983642,0.00016706936,0.000071640374,0.00012150324,0.0019088301,0.0010984836,0.0033559927],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905616,0.00016835878,0.000030180228,0.00023292234,0.00039960523,0.00011282848],"domain_scores_gemma":[0.9993086,0.00013461549,0.000049232993,0.0003045735,0.00015321391,0.000049768223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050086813,0.0013162819,0.0013133773,0.0013076314,0.0003910998,0.0014528524,0.0018048564,0.00080039166,0.006567702],"category_scores_gemma":[0.0015718492,0.00086373166,0.0009335486,0.0017104546,0.0007136124,0.0015974012,0.0034817446,0.0007768887,0.0038807916],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039995016,0.00029295977,0.003919413,0.0003065029,0.00012327642,0.00033931175,0.0004990586,0.1031764,0.035005745,0.008917004,0.00774191,0.8392784],"study_design_scores_gemma":[0.00003739178,0.00014710751,0.0063522113,0.000071662755,0.000050599756,0.00044629842,0.00032161138,0.9261248,0.02878153,0.018847682,0.0187587,0.000060373142],"about_ca_topic_score_codex":0.0046827733,"about_ca_topic_score_gemma":0.0067058387,"teacher_disagreement_score":0.006567702,"about_ca_system_score_codex":0.00036498686,"about_ca_system_score_gemma":0.0007201469,"threshold_uncertainty_score":0.021971226},"labels":[],"label_agreement":null},{"id":"W7090441425","doi":"10.1016/j.autcon.2025.106608","title":"Multi-objective optimization model for automated risk-based inspection planning for concrete bridges","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Gina Cody School of Engineering and Computer Science, Concordia University","keywords":"Automation; Operation planning; Bridge (graph theory); Expert system","score_opus":0.01633670051335344,"score_gpt":0.2761565638797212,"score_spread":0.25981986336636775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7090441425","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011864431,0.00022859029,0.98128605,0.00030277605,0.000027810947,0.00008242744,0.00018586262,0.0001793834,0.005842596],"genre_scores_gemma":[0.77950513,0.00063764874,0.20223558,0.0002315854,0.000051413757,0.0009817898,0.00051755266,0.00014319703,0.015696133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993061,0.00028005813,0.000029097353,0.00013130417,0.00016444734,0.00008903119],"domain_scores_gemma":[0.9988524,0.0007483169,0.00015149683,0.00003271038,0.00016499445,0.000050068007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017490035,0.0012639613,0.001256725,0.000786349,0.00045209817,0.001601078,0.001506657,0.0017844125,0.004262673],"category_scores_gemma":[0.0028367417,0.00082279125,0.0011581017,0.00077957596,0.0008034257,0.00095073855,0.001176325,0.0017825492,0.0005790871],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059548474,0.0000067366404,0.00005520072,0.000009311461,0.0000057135844,0.000009738925,0.0000055117102,0.9972709,0.00007033182,0.0016044622,0.00007352732,0.0008824988],"study_design_scores_gemma":[0.0000021454564,0.000005462739,0.000026520418,0.000001997119,0.0000019774732,0.0000015181114,0.0000018619953,0.9992061,0.000029917002,0.0006327018,0.00008827149,0.0000015609257],"about_ca_topic_score_codex":0.013350475,"about_ca_topic_score_gemma":0.010657176,"teacher_disagreement_score":0.013350475,"about_ca_system_score_codex":0.0017952509,"about_ca_system_score_gemma":0.0021339455,"threshold_uncertainty_score":0.026545584},"labels":[],"label_agreement":null},{"id":"W7093306288","doi":"10.1016/j.autcon.2025.106618","title":"Integrated framework of computer vision and fuzzy systems for lean workspace management in construction","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workspace; Dashboard; Workflow; Fuzzy logic; Index (typography); Fuzzy control system; Workflow management system; Inference engine","score_opus":0.005108952100332462,"score_gpt":0.23166076692432028,"score_spread":0.2265518148239878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7093306288","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028630598,0.00024238482,0.99233127,0.00016304823,0.00002946536,0.00005793042,0.000033247106,0.00027800316,0.0040016277],"genre_scores_gemma":[0.27684897,0.00058951497,0.7185237,0.00015667049,0.00006500959,0.00031601443,0.00013840674,0.00005295823,0.0033087656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991285,0.0002292607,0.000060523147,0.00019204745,0.0003345839,0.00005515001],"domain_scores_gemma":[0.99933845,0.00025260155,0.000068709785,0.000054327895,0.00025482615,0.00003105913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013988194,0.0007360426,0.00050331134,0.0014853065,0.0006628559,0.001976659,0.0013232423,0.0009264678,0.002349841],"category_scores_gemma":[0.0019838372,0.00029718876,0.0011321192,0.00079447223,0.0010334532,0.0013878015,0.0010536114,0.0010562309,0.00055522955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000118680706,0.00016946484,0.0024160682,0.00036875514,0.00013404622,0.00034241102,0.0006503386,0.4704766,0.014875721,0.24565122,0.0031642122,0.2616325],"study_design_scores_gemma":[0.000017276034,0.00011284334,0.0008051352,0.000097553435,0.000043202213,0.000109417735,0.00011282043,0.9221283,0.0032768787,0.062792875,0.010459514,0.000044165525],"about_ca_topic_score_codex":0.01552391,"about_ca_topic_score_gemma":0.011580233,"teacher_disagreement_score":0.01552391,"about_ca_system_score_codex":0.0021082077,"about_ca_system_score_gemma":0.0023017216,"threshold_uncertainty_score":0.0308671},"labels":[],"label_agreement":null},{"id":"W7102803848","doi":"10.1016/j.autcon.2025.106624","title":"Decision support framework for screening deficient bridges based on statistically-identified key indicators and Monte Carlo simulation","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Windsor; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Key (lock); Decision support system; Monte Carlo method; Decision analysis; Decision aids","score_opus":0.0071483794990576666,"score_gpt":0.27280433618584693,"score_spread":0.26565595668678926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7102803848","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012175414,0.000058163943,0.98379827,0.00019697036,0.0000165701,0.00017589284,0.0001104322,0.00029569006,0.0031724488],"genre_scores_gemma":[0.5988683,0.0002057539,0.39716065,0.0001190719,0.00003191838,0.0011871542,0.000256165,0.00005456148,0.0021164129],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988821,0.0005276521,0.00006584255,0.00014504816,0.0002622691,0.00011696102],"domain_scores_gemma":[0.99708396,0.0021456566,0.0001987582,0.000060554907,0.00041361607,0.000097475015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003648172,0.0012359122,0.0014229517,0.0016255752,0.00079909276,0.0019625784,0.0022411314,0.0017645403,0.0052508605],"category_scores_gemma":[0.006071246,0.0007191364,0.0011931633,0.0010355667,0.0008684894,0.0011405004,0.0012756039,0.0011805828,0.00041043185],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018718998,0.000022434391,0.00018801003,0.000021209526,0.000010609613,0.000030536765,0.000020386868,0.99080396,0.00016823644,0.005409404,0.000089007975,0.0032174913],"study_design_scores_gemma":[0.00000675793,0.000009747906,0.000024000792,0.0000038457374,0.0000037297743,0.0000036596855,0.000005635772,0.9982486,0.000063366235,0.0015276782,0.000100146746,0.000002881047],"about_ca_topic_score_codex":0.018719725,"about_ca_topic_score_gemma":0.013684013,"teacher_disagreement_score":0.018719725,"about_ca_system_score_codex":0.0021936963,"about_ca_system_score_gemma":0.003675026,"threshold_uncertainty_score":0.03722155},"labels":[],"label_agreement":null}]}