{"meta":{"query_hash":"99f9e143a2d5","filters":{"venue":"Bell Labs Technical Journal"},"cohort_total":5,"direct_labels_cover":0,"predictions_cover":5,"exported":5,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/99f9e143a2d5","api":"https://metacan.xera.ac/api/v1/cohort?venue=Bell+Labs+Technical+Journal"},"results":[{"id":"W2009829758","doi":"10.1002/bltj.20081","title":"The wireless edge router: A network processor-based packet data serving node for a CDMA2000* network","year":2005,"lang":"en","type":"article","venue":"Bell Labs Technical Journal","topic":"Wireless Communication Networks Research","field":"Computer Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"","keywords":"Packet processing; Computer network; Packet analyzer; Processing delay; Computer science; Network packet; Network processor; Router; Default gateway; Source routing; Link state packet; Packet switching; Packet generator; Embedded system; Transmission delay; Routing table; Routing protocol","score_opus":0.05561924064170384,"score_gpt":0.3300429966290343,"score_spread":0.2744237559873305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009829758","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1356569,0.0007545376,0.81247693,0.0005667241,0.00033120974,0.0005891585,0.0003671525,0.013618564,0.035638817],"genre_scores_gemma":[0.4400329,0.0006046603,0.50861,0.0006495121,0.00013042185,0.0003361349,0.0010509732,0.00037672653,0.04820866],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998123,0.000037909955,0.000012175036,0.00005198877,0.000057991303,0.000027578712],"domain_scores_gemma":[0.9998276,0.000021776084,0.000016205719,0.00004273789,0.00006191969,0.000029627736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036804733,0.00033519193,0.00019428133,0.00032988528,0.00034152516,0.00080237404,0.0010972709,0.0005193358,0.004711021],"category_scores_gemma":[0.0004043346,0.00018837147,0.00015168956,0.00028367937,0.00022820642,0.0008286538,0.00036302017,0.00047059354,0.0027300098],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012757044,0.00043219124,0.004473599,0.0003442802,0.000109983695,0.00060289406,0.0002441269,0.01680546,0.38901082,0.06435727,0.043234944,0.47910875],"study_design_scores_gemma":[0.00028528116,0.0018463905,0.005167748,0.00006921954,0.00026310285,0.0014487483,0.000116211464,0.32381642,0.34798044,0.0063599404,0.3125387,0.00010777344],"about_ca_topic_score_codex":0.00088422047,"about_ca_topic_score_gemma":0.001391529,"teacher_disagreement_score":0.004711021,"about_ca_system_score_codex":0.00054730324,"about_ca_system_score_gemma":0.00062419777,"threshold_uncertainty_score":0.015759945},"labels":[],"label_agreement":null},{"id":"W2105118201","doi":"10.1002/bltj.21602","title":"Making smart use of excess antennas: Massive MIMO, small cells, and TDD","year":2013,"lang":"en","type":"article","venue":"Bell Labs Technical Journal","topic":"Advanced MIMO Systems Optimization","field":"Engineering","cited_by":196,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"FP7 Information and Communication Technologies; Ministry of Economy, Trade and Industry","keywords":"Precoding; Telecommunications link; Base station; Backhaul (telecommunications); MIMO; Computer network; Duplex (building); Computer science; Channel state information; Zero-forcing precoding; Channel (broadcasting); Electronic engineering; Engineering; Wireless; Telecommunications","score_opus":0.027779158761626815,"score_gpt":0.2372288348150497,"score_spread":0.20944967605342288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105118201","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10947814,0.004314738,0.8671927,0.0014758816,0.00041009378,0.000043573586,0.00009335534,0.00075411965,0.016237356],"genre_scores_gemma":[0.91536456,0.0013910884,0.079864025,0.00041839885,0.00015929397,0.000026190037,0.000046438647,0.000021252667,0.0027086418],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997552,0.000084848274,0.000005890384,0.000040966446,0.0000763752,0.00003679023],"domain_scores_gemma":[0.9994332,0.00027281334,0.000060301092,0.000113686474,0.00007782034,0.000042165975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042999495,0.0004183839,0.00035507168,0.00026125705,0.00024705616,0.0007413455,0.0004647986,0.00042778268,0.00065138243],"category_scores_gemma":[0.0010218906,0.00017345978,0.00019248575,0.00041925148,0.00088135636,0.0009393642,0.0006463354,0.00049541105,0.000297892],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006468435,0.00015755705,0.007529286,0.000322159,0.00016505053,0.00077630585,0.00038009638,0.30406836,0.12115475,0.13196278,0.0068222964,0.42601454],"study_design_scores_gemma":[0.000057268207,0.00058102247,0.0023480929,0.000049036815,0.00007754191,0.0008405668,0.0002335096,0.8824685,0.035400998,0.05630264,0.021558303,0.00008253105],"about_ca_topic_score_codex":0.0009768575,"about_ca_topic_score_gemma":0.0013211067,"teacher_disagreement_score":0.0009768575,"about_ca_system_score_codex":0.00042845673,"about_ca_system_score_gemma":0.00023798128,"threshold_uncertainty_score":0.0031086802},"labels":[],"label_agreement":null},{"id":"W4231870457","doi":"10.1002/bltj.20367","title":"Authenticating displayed names in telephony","year":2009,"lang":"en","type":"article","venue":"Bell Labs Technical Journal","topic":"IPv6, Mobility, Handover, Networks, Security","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"Intel Corporation","keywords":"Voice over IP; Computer security; Public key infrastructure; Spoofing attack; SIP trunking; Telephony; Authentication (law); Session Initiation Protocol; The Internet; Computer science; Telecommunications; Business; Public-key cryptography; Computer network; World Wide Web; Server","score_opus":0.004169850708366503,"score_gpt":0.21644505854714025,"score_spread":0.21227520783877374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231870457","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025675772,0.0006610458,0.94735384,0.00088790106,0.00031097652,0.0004897686,0.000079902864,0.0032976754,0.021242969],"genre_scores_gemma":[0.6042751,0.0009193769,0.36820275,0.00067660975,0.0003251937,0.00045782444,0.0003336805,0.00048090404,0.024328686],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9887321,0.004390996,0.0006959421,0.0012600039,0.0040114378,0.000909423],"domain_scores_gemma":[0.99182665,0.0020725022,0.0008916671,0.0038447678,0.0010910929,0.00027336463],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007988112,0.0006350245,0.0009797926,0.000862778,0.002690043,0.0056938245,0.0024681485,0.0046849633,0.0052886964],"category_scores_gemma":[0.010024515,0.0010749082,0.0008312316,0.0010902538,0.006131347,0.011795089,0.007278709,0.0035199912,0.0044303252],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008360554,0.00018697683,0.0019064709,0.00031054,0.000028688379,0.0014567974,0.0040729656,0.006175349,0.029494245,0.8146181,0.008254562,0.1326592],"study_design_scores_gemma":[0.000422879,0.0011962669,0.0016935925,0.0005434816,0.00016577149,0.006707385,0.0017684064,0.13044478,0.14908232,0.24848036,0.4590911,0.00040357746],"about_ca_topic_score_codex":0.0010302155,"about_ca_topic_score_gemma":0.0005935483,"teacher_disagreement_score":0.007988112,"about_ca_system_score_codex":0.0013969237,"about_ca_system_score_gemma":0.0016930946,"threshold_uncertainty_score":0.042245686},"labels":[],"label_agreement":null},{"id":"W4249456371","doi":"10.1002/bltj.20239","title":"Design and development of a terrestrial digital video broadcast demodulation core: An international collaborative effort","year":2007,"lang":"en","type":"article","venue":"Bell Labs Technical Journal","topic":"Advanced Wireless Communication Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"Xilinx","keywords":"Digital television; Engineering; Telecommunications; Demodulation; USB; Digital Video Broadcasting; Digital audio broadcasting; Embedded system; Computer science; Computer hardware; Multimedia; Operating system; Software","score_opus":0.028120265623413642,"score_gpt":0.29851063124178895,"score_spread":0.2703903656183753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249456371","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10665286,0.0010741167,0.8550615,0.0006623562,0.00016840665,0.0004971297,0.00008336376,0.0014649616,0.034335304],"genre_scores_gemma":[0.26111892,0.0012418998,0.7012036,0.00020918463,0.00008076838,0.00025916312,0.0003163367,0.00046850057,0.035101626],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987514,0.0002456151,0.00006436871,0.00019080316,0.0006415798,0.00010615279],"domain_scores_gemma":[0.9988681,0.00011143644,0.000066009925,0.00015257535,0.0007237907,0.00007817312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030747617,0.00054197985,0.0003987831,0.00061472086,0.00037895062,0.0013488746,0.00080350763,0.0005417975,0.0020739173],"category_scores_gemma":[0.001659729,0.0002454336,0.0003940597,0.0005328381,0.0004516392,0.00093364064,0.0005319853,0.0005164652,0.0011199479],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003344976,0.00036111812,0.003174933,0.00042399528,0.00009132715,0.0003183909,0.0011439027,0.044073317,0.24988206,0.05444589,0.0061195777,0.63963103],"study_design_scores_gemma":[0.00018861346,0.0036660673,0.002317083,0.00013249698,0.00022833006,0.00080532616,0.0003826235,0.23227349,0.5559359,0.003437089,0.20056228,0.000070723974],"about_ca_topic_score_codex":0.0014873792,"about_ca_topic_score_gemma":0.0011517127,"teacher_disagreement_score":0.0030747617,"about_ca_system_score_codex":0.00092288334,"about_ca_system_score_gemma":0.0020730186,"threshold_uncertainty_score":0.0162611},"labels":[],"label_agreement":null},{"id":"W4256063023","doi":"10.1002/bltj.20335","title":"Performance assessment of next-generation wireless mobile systems","year":2009,"lang":"en","type":"article","venue":"Bell Labs Technical Journal","topic":"Advanced Wireless Network Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"","keywords":"UMTS frequency bands; WiMAX; 3rd Generation Partnership Project 2; Telecommunications; Computer network; Mobile broadband; Engineering; Next-generation network; Wireless broadband; Orthogonal frequency-division multiplexing; Wireless; Computer science; Wireless network; The Internet; Telecommunications link","score_opus":0.017421103722550606,"score_gpt":0.2558220676393434,"score_spread":0.2384009639167928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256063023","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77369887,0.008140122,0.13931715,0.0011799483,0.00022833148,0.00018764095,0.00073335535,0.0007524846,0.0757621],"genre_scores_gemma":[0.9927866,0.0007318348,0.0041332073,0.000039789986,0.000054615623,0.000022267748,0.00030835927,0.000025802678,0.001897616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837816,0.00054542685,0.0000649616,0.00011726244,0.00069357693,0.0002005484],"domain_scores_gemma":[0.9968533,0.0014549893,0.00018675032,0.00019795206,0.0012156173,0.000091358685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015710106,0.0005872138,0.00036149888,0.0009464393,0.00041667995,0.0010042235,0.000413389,0.0005536025,0.0018801391],"category_scores_gemma":[0.005471423,0.000099787096,0.0002351282,0.000965135,0.0002537489,0.0011299402,0.0005216512,0.00034703565,0.0004654333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007697243,0.00018703687,0.021657353,0.00023878684,0.000146336,0.00033247986,0.0001336923,0.7876279,0.014951064,0.018142184,0.002898358,0.15291508],"study_design_scores_gemma":[0.00002868951,0.0010647859,0.01827497,0.000044941135,0.000079477606,0.00042633637,0.00018953216,0.95557785,0.012834697,0.0046568317,0.0067811646,0.000040739866],"about_ca_topic_score_codex":0.0022841883,"about_ca_topic_score_gemma":0.0014461647,"teacher_disagreement_score":0.0022841883,"about_ca_system_score_codex":0.0009654008,"about_ca_system_score_gemma":0.0004828,"threshold_uncertainty_score":0.008308411},"labels":[],"label_agreement":null}]}