{"meta":{"query_hash":"f1692f0e6a62","filters":{"venue":"Brazilian Journal of Operations & Production Management"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/f1692f0e6a62","api":"https://metacan.xera.ac/api/v1/cohort?venue=Brazilian+Journal+of+Operations+%26+Production+Management"},"results":[{"id":"W2922284585","doi":"10.14488/bjopm.2019.v16.n1.a6","title":"A contemporary vision of project success criteria","year":2019,"lang":"en","type":"article","venue":"Brazilian Journal of Operations & Production Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Originality; Ranking (information retrieval); Project management; Identification (biology); Scale (ratio); Management science; Sample (material); Success factors; Value (mathematics); Diversity (politics); Knowledge management; Engineering; Process management; Computer science; Business; Qualitative research; Political science; Sociology; Geography; Systems engineering","score_opus":0.06601797965212218,"score_gpt":0.3975291867565739,"score_spread":0.3315112071044517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922284585","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94553345,0.00029311873,0.0052653,0.0042824014,0.0052800714,0.0014376823,0.0000069356206,0.000028161616,0.03787285],"genre_scores_gemma":[0.97669154,0.00010394248,0.0059668524,0.00008565079,0.00023175421,0.0000100931475,0.000004249136,0.000011648862,0.016894257],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963299,0.0002557142,0.0015712689,0.000387922,0.0012930677,0.00016209886],"domain_scores_gemma":[0.99738055,0.000053208998,0.000701893,0.00067357655,0.0011358676,0.000054916018],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0038175455,0.0001646454,0.00037842355,0.0014837101,0.00017022657,0.0003344488,0.0006939237,0.000040170387,0.0013772319],"category_scores_gemma":[0.00024390983,0.00012484811,0.00018165942,0.0015544739,0.0001077772,0.002429212,0.00016066646,0.00016050389,0.0001580818],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013324872,0.001034102,0.09848393,0.00048538714,0.00068781164,0.0000432205,0.00346296,0.015977232,0.011147241,0.0152592445,0.52531755,0.32676882],"study_design_scores_gemma":[0.0044223885,0.0019502467,0.113854975,0.00067199697,0.00019723912,0.00033505203,0.01372584,0.007877227,0.009470265,0.003010579,0.8435854,0.0008988108],"about_ca_topic_score_codex":0.000012037755,"about_ca_topic_score_gemma":0.000008490146,"teacher_disagreement_score":0.32587,"about_ca_system_score_codex":0.000045892477,"about_ca_system_score_gemma":0.00014344472,"threshold_uncertainty_score":0.9995356},"labels":[],"label_agreement":null},{"id":"W3125454972","doi":"10.14488/bjopm.2021.007","title":"A Multi-Objective Scheduling Algorithm for Multi-Mode Resource Constrained Projects in the Presence of Uncertain Resource Availability","year":2021,"lang":"en","type":"article","venue":"Brazilian Journal of Operations & Production Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Fair-share scheduling; Dynamic priority scheduling; Genetic algorithm scheduling; Mathematical optimization; Job shop scheduling; Heuristic; Rate-monotonic scheduling; Operations research; Industrial engineering; Engineering; Mathematics; Artificial intelligence","score_opus":0.027289861930830592,"score_gpt":0.28336254524699805,"score_spread":0.25607268331616745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125454972","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09711819,0.0008194371,0.8964449,0.0019431388,0.00089136465,0.0020474084,0.000035321373,0.00006095386,0.00063926174],"genre_scores_gemma":[0.47978014,0.00007604736,0.51901567,0.000061138315,0.00023354062,0.00014660945,0.000022238637,0.00002214897,0.00064243696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983948,0.00022264203,0.0007039841,0.00024587792,0.00026364825,0.00016904196],"domain_scores_gemma":[0.99894875,0.000056261004,0.00013140067,0.00030336366,0.0005226779,0.00003751573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001009005,0.00014869278,0.00021097972,0.0002389004,0.00016572165,0.00008131972,0.00019322106,0.00005655265,0.00001961973],"category_scores_gemma":[0.000308611,0.00012410888,0.00010910384,0.0005996766,0.00011911857,0.00033419824,0.000021614931,0.00026719217,0.0000013196525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007734068,0.0005505106,0.00044154385,0.00032101411,0.00029103522,0.000021369335,0.008261453,0.8141984,0.009802224,0.0019073791,0.0014721903,0.16265555],"study_design_scores_gemma":[0.0028313245,0.00017908188,0.0038031517,0.0004577822,0.00016804288,0.00035345656,0.056607056,0.89853865,0.025390495,0.00017348428,0.011123565,0.00037393294],"about_ca_topic_score_codex":0.0000094400075,"about_ca_topic_score_gemma":0.00013065709,"teacher_disagreement_score":0.38266197,"about_ca_system_score_codex":0.0001263565,"about_ca_system_score_gemma":0.000107115266,"threshold_uncertainty_score":0.5061013},"labels":[],"label_agreement":null},{"id":"W4226029862","doi":"10.14488/bjopm.2022.007","title":"Training for Industry 4.0: a systematic literature review and directions for future research","year":2022,"lang":"en","type":"article","venue":"Brazilian Journal of Operations & Production Management","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Originality; Systematic review; Value (mathematics); Sustainability; Knowledge management; Selection (genetic algorithm); Management science; Computer science; Engineering; Sociology; Political science; Qualitative research; Social science; Artificial intelligence","score_opus":0.054352350859329705,"score_gpt":0.3271792926208402,"score_spread":0.2728269417615105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226029862","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019498324,0.64027375,0.08329538,0.13383481,0.030543253,0.05823855,0.0012718666,0.0010513803,0.031992693],"genre_scores_gemma":[0.66013885,0.12640785,0.11468416,0.002220471,0.010993233,0.030544773,0.0005446213,0.000566184,0.053899847],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99869174,0.00009590456,0.000594995,0.00014164788,0.00029525836,0.00018046504],"domain_scores_gemma":[0.99923223,0.0000402057,0.000067491346,0.00018095892,0.00040990653,0.000069207905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018360766,0.00011347199,0.00024104612,0.00044654612,0.0006345423,0.00019509751,0.00016147854,0.000055057808,0.00003234376],"category_scores_gemma":[0.000107400665,0.000108831315,0.000084421146,0.00076855836,0.000025809928,0.0006839603,0.000022731938,0.00061611127,8.7417527e-7],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000924049,0.0003508395,0.000020406393,0.31213638,0.0017862968,0.000020323247,0.013211299,0.23410729,0.00024640138,0.037849847,0.33498758,0.06519094],"study_design_scores_gemma":[0.0014763816,0.00059956446,0.00013180995,0.025378454,0.0009547342,0.0018272196,0.04780317,0.0027438751,0.00021356941,0.0011744688,0.91707635,0.0006203989],"about_ca_topic_score_codex":6.89382e-8,"about_ca_topic_score_gemma":9.0721153e-7,"teacher_disagreement_score":0.64064056,"about_ca_system_score_codex":0.00014945588,"about_ca_system_score_gemma":0.00003489567,"threshold_uncertainty_score":0.48804504},"labels":[],"label_agreement":null}]}