{"meta":{"query_hash":"6594144cf3b2","filters":{"venue":"Built Environment Project and Asset Management"},"cohort_total":14,"direct_labels_cover":0,"predictions_cover":14,"exported":14,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/6594144cf3b2","api":"https://metacan.xera.ac/api/v1/cohort?venue=Built+Environment+Project+and+Asset+Management"},"results":[{"id":"W1525972495","doi":"10.1108/bepam-03-2013-0004","title":"A game-theoretic model for roadway performance management","year":2014,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Asset (computer security); Asset management; Multitude; Computer science; Game theory; Set (abstract data type); IT asset management; Risk analysis (engineering); Management science; Operations research; Knowledge management; Business; Microeconomics; Economics; Computer security; Engineering; Finance","score_opus":0.018311758078922994,"score_gpt":0.2655456986617421,"score_spread":0.2472339405828191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1525972495","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12354591,0.00007833892,0.778339,0.000720132,0.00014611651,0.002709155,0.000017904775,0.00018904358,0.09425435],"genre_scores_gemma":[0.9563211,0.0017623842,0.025637055,0.00018583414,0.000046124296,0.00037570522,0.00008261607,0.000017432476,0.015571729],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887747,0.00004677992,0.00018390939,0.000312956,0.00029286297,0.00028605197],"domain_scores_gemma":[0.99966884,0.00002341043,0.00007468337,0.00017070846,0.0000069947428,0.000055341014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006219704,0.00013359437,0.000113202244,0.00010598495,0.00032235173,0.00007460633,0.0001479267,0.000045259156,0.00002392839],"category_scores_gemma":[0.0000030934202,0.00013054206,0.000040062998,0.000077096614,0.000101147336,0.00014784948,0.000033900382,0.00004179641,0.000012824258],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001658257,0.00037726137,0.013478314,0.0010401313,0.00022406268,0.0000045925326,0.01189022,0.18914281,0.000009368325,0.51159674,0.004013963,0.26805672],"study_design_scores_gemma":[0.0017501909,0.00018106114,0.01899694,0.00010569253,0.00025129216,3.333555e-7,0.0021825777,0.5858943,0.000018339608,0.0045969402,0.38547477,0.00054757687],"about_ca_topic_score_codex":0.00001859964,"about_ca_topic_score_gemma":0.000012438885,"teacher_disagreement_score":0.83277524,"about_ca_system_score_codex":0.000047384303,"about_ca_system_score_gemma":0.0000068078234,"threshold_uncertainty_score":0.5323351},"labels":[],"label_agreement":null},{"id":"W1674731675","doi":"10.1108/bepam-02-2014-0012","title":"An ontology-supported asset information integrator system in infrastructure management","year":2015,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Ontology; Asset (computer security); Knowledge management; Information system; Database transaction; Asset management; Database; Software engineering; Computer security; Engineering; Business","score_opus":0.014785901619107393,"score_gpt":0.24560615925495236,"score_spread":0.23082025763584496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1674731675","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53365695,0.0003164562,0.40991044,0.0009905619,0.0010725331,0.004330974,0.000020398507,0.0009703983,0.0487313],"genre_scores_gemma":[0.9581475,0.00015946949,0.040924806,0.00026057247,0.000023120434,0.0002132787,0.000078014906,0.0000094485995,0.00018378315],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9981391,0.000130468,0.00043870104,0.000455125,0.00043865005,0.0003979851],"domain_scores_gemma":[0.99904954,0.00001367745,0.00016145382,0.0006476303,0.0000134264765,0.00011424836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006098606,0.00027636043,0.00026578965,0.00041828316,0.00007652857,0.0002718233,0.00071363186,0.000101278405,0.000005862021],"category_scores_gemma":[0.000005887372,0.00023205558,0.00003526333,0.00024916025,0.00005226528,0.0013145426,0.00057957484,0.00015905483,0.00004439383],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001476225,0.0006025784,0.14994144,0.0010892999,0.00041500226,0.0007490353,0.005273725,0.0023020876,0.000055782268,0.2513265,0.017706806,0.5703901],"study_design_scores_gemma":[0.0048792623,0.001041889,0.60155606,0.0001848374,0.0001370229,0.00009365355,0.027370278,0.08240743,0.00017441084,0.0036246204,0.27726653,0.0012639684],"about_ca_topic_score_codex":0.00011121275,"about_ca_topic_score_gemma":0.000029522316,"teacher_disagreement_score":0.5691261,"about_ca_system_score_codex":0.00025352548,"about_ca_system_score_gemma":0.00002190758,"threshold_uncertainty_score":0.9462952},"labels":[],"label_agreement":null},{"id":"W2031552503","doi":"10.1108/bepam-09-2013-0036","title":"The role of team leadership in achieving LEED certification in a green building project","year":2015,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centennial College","funders":"","keywords":"Certification; Teamwork; Knowledge management; Engineering management; Green building; Engineering; Process management; Computer science; Management; Architectural engineering","score_opus":0.22331975697514045,"score_gpt":0.34677003735195605,"score_spread":0.1234502803768156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031552503","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9617869,0.0012921601,0.0009598701,0.0021085162,0.0002049837,0.002992341,0.0000056553586,0.000043081196,0.030606497],"genre_scores_gemma":[0.9957679,0.00040201755,0.0011306497,0.00004425807,0.000030015033,0.0001904719,0.000004699365,0.000012215605,0.0024177597],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.997012,0.00026814992,0.00080571434,0.0005486775,0.00097310386,0.00039234082],"domain_scores_gemma":[0.9988532,0.00018782333,0.00032329262,0.0005746345,0.000020047897,0.000040968753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046830736,0.0001996865,0.00025261537,0.0008386361,0.00012445,0.00019683,0.0006199468,0.000056731613,0.000013206582],"category_scores_gemma":[0.00010920123,0.00014213387,0.000054822984,0.00091556075,0.00015671908,0.00047742567,0.0004877071,0.0001726594,0.00001876905],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001682336,0.000138344,0.3306588,0.000055386296,0.000034436966,0.0000043074824,0.001942642,0.00027425142,0.00035053462,0.0077802874,0.00068974,0.657903],"study_design_scores_gemma":[0.0030384965,0.00034584175,0.36394942,0.00020258038,0.00006226691,0.000009021963,0.078959584,0.027419513,0.0007664949,0.01703161,0.5074759,0.00073922804],"about_ca_topic_score_codex":0.0006487898,"about_ca_topic_score_gemma":0.00037122684,"teacher_disagreement_score":0.6571638,"about_ca_system_score_codex":0.00012709862,"about_ca_system_score_gemma":0.000034627366,"threshold_uncertainty_score":0.5796051},"labels":[],"label_agreement":null},{"id":"W2038275092","doi":"10.1108/20441241111143812","title":"Applying just‐in‐time principles in the delivery and management of airport terminal buildings","year":2011,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Context (archaeology); Productivity; Quality (philosophy); Business; Work (physics); Marketing; Operations management; International airport; Transport engineering; Engineering; Process management; Economics","score_opus":0.026072551679239483,"score_gpt":0.2192267643145724,"score_spread":0.1931542126353329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038275092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9841236,0.0002580064,0.0026700322,0.00001988952,0.000028526621,0.001865779,0.0000034130105,0.000046524678,0.010984253],"genre_scores_gemma":[0.97580814,0.0031516976,0.020250954,0.00002981255,0.000012113232,0.0005029741,0.0000132710975,0.000025698297,0.00020535574],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99894524,0.000026121112,0.00031757055,0.0002526083,0.00022950686,0.00022894151],"domain_scores_gemma":[0.9996648,0.000013465467,0.00006263393,0.00023648885,0.0000020251402,0.000020624491],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042424057,0.00018360105,0.00017611231,0.00019345702,0.000033701115,0.000024395345,0.00019543692,0.00004155361,0.000010933441],"category_scores_gemma":[9.307465e-7,0.00015839106,0.000022646083,0.00012658419,0.000039020397,0.00011508666,0.00022766711,0.000085001775,0.0000036740103],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023700023,0.0013558167,0.6488776,0.0084175365,0.000828367,0.0013584226,0.008981542,0.06350307,0.0013913973,0.009703891,0.001585945,0.2537594],"study_design_scores_gemma":[0.0016561933,0.00014644479,0.93966,0.0005026864,0.00021363204,0.000023444269,0.0024594737,0.042071167,0.00046394035,0.00016395442,0.012017469,0.00062161154],"about_ca_topic_score_codex":0.000033626333,"about_ca_topic_score_gemma":0.000006051073,"teacher_disagreement_score":0.2907824,"about_ca_system_score_codex":0.000052579024,"about_ca_system_score_gemma":0.0000018939137,"threshold_uncertainty_score":0.6459},"labels":[],"label_agreement":null},{"id":"W2527908636","doi":"10.1108/bepam-10-2015-0056","title":"Analyzing relationships between project team compositions and green building certification in green building projects","year":2016,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Certification; Green building; Project team; Project management; Project stakeholder; Engineering management; Project management triangle; Knowledge management; Engineering; Project charter; Business; Architectural engineering; Computer science; Management; Systems engineering","score_opus":0.03855807610709506,"score_gpt":0.26595830781715574,"score_spread":0.22740023171006069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527908636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92235106,0.00046568405,0.071745545,0.000709833,0.00006551999,0.002623293,0.00003308218,0.0003314376,0.001674558],"genre_scores_gemma":[0.9846132,0.0008725169,0.013205427,0.000012212487,0.00009009863,0.00045604535,0.00003185273,0.0000615851,0.0006570852],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9978062,0.00016461429,0.00051983946,0.0006440316,0.00030069298,0.0005646386],"domain_scores_gemma":[0.99923885,0.0001590388,0.000109815956,0.0003886534,0.000011188641,0.00009248316],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00076684233,0.00037958715,0.00032932177,0.0008139377,0.0002780312,0.00013216992,0.00020707858,0.00012258567,0.000007652352],"category_scores_gemma":[0.000013300032,0.00032617542,0.000053794072,0.00041838497,0.000086284286,0.0005013655,0.00024668608,0.00024644876,0.000005692726],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006562772,0.00033129627,0.5534819,0.0018012825,0.00076743955,0.00009130039,0.0016959725,0.0018133398,0.0347844,0.013203543,0.0014000123,0.3905639],"study_design_scores_gemma":[0.006508222,0.0005751048,0.8632959,0.002231236,0.000947548,0.000047358444,0.0045934287,0.029200967,0.0061641834,0.010074941,0.07278197,0.0035791022],"about_ca_topic_score_codex":0.00027096563,"about_ca_topic_score_gemma":0.000020358671,"teacher_disagreement_score":0.3869848,"about_ca_system_score_codex":0.00045322865,"about_ca_system_score_gemma":0.000021151875,"threshold_uncertainty_score":0.99991906},"labels":[],"label_agreement":null},{"id":"W2742566035","doi":"10.1108/bepam-11-2016-0061","title":"An eco asset ontology towards effective eco asset management","year":2017,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cumulative Environmental Management Association","funders":"","keywords":"Ontology; Computer science; IT asset management; Asset (computer security); Asset management; Knowledge management; Risk analysis (engineering); Alternative asset; Business; Consumption-based capital asset pricing model; Computer security; Capital asset pricing model; Finance","score_opus":0.01953844444456498,"score_gpt":0.29235903420718057,"score_spread":0.2728205897626156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2742566035","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5172849,0.0009086044,0.29763564,0.0075684465,0.0027794305,0.009365787,0.00008284562,0.0010727312,0.1633016],"genre_scores_gemma":[0.9490693,0.0014020704,0.04573976,0.00054115505,0.00012601625,0.0007086028,0.000050728468,0.00003693346,0.0023253951],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9964652,0.00023475103,0.00043307524,0.0014283047,0.00059987156,0.00083879585],"domain_scores_gemma":[0.99672323,0.000056925306,0.00035717155,0.0026855024,0.000014098318,0.00016309258],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009251424,0.0005419203,0.0005289256,0.0002940549,0.0007842147,0.0010089211,0.002501963,0.00015604468,0.000050051367],"category_scores_gemma":[0.000016090335,0.00047689368,0.00013504984,0.000090777896,0.00023961166,0.0011517723,0.0025388028,0.00022193266,0.00013060885],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080147234,0.0010803163,0.04192086,0.0004133388,0.0009403567,0.0010725628,0.0005551928,0.00011012741,0.00014360677,0.064492114,0.010293047,0.8788983],"study_design_scores_gemma":[0.0019400402,0.00083265663,0.8711463,0.00006694868,0.00020734467,0.000035677076,0.00045356923,0.0053735212,0.00045035264,0.0049879868,0.11360236,0.0009032331],"about_ca_topic_score_codex":0.00030185518,"about_ca_topic_score_gemma":0.00012600778,"teacher_disagreement_score":0.8779951,"about_ca_system_score_codex":0.00017395684,"about_ca_system_score_gemma":0.00001848736,"threshold_uncertainty_score":0.99976826},"labels":[],"label_agreement":null},{"id":"W2777689208","doi":"10.1108/bepam-03-2017-0017","title":"Model for developing trust on US construction projects","year":2017,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Originality; Business; Measure (data warehouse); Phone; Value (mathematics); Integrated project delivery; Knowledge management; Process management; Computer science; Project management; Engineering; Systems engineering; Qualitative research","score_opus":0.19274436991268185,"score_gpt":0.3801893441129762,"score_spread":0.18744497420029438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2777689208","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77474445,0.000057064106,0.14202914,0.003145595,0.001175014,0.0052735955,0.00007044578,0.00014602138,0.07335869],"genre_scores_gemma":[0.9195676,0.0006678645,0.055869803,0.00042901325,0.00016012488,0.000662007,0.00002354138,0.000033768578,0.022586318],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.997155,0.00004747026,0.00055854564,0.0009231246,0.0008933206,0.00042252734],"domain_scores_gemma":[0.99813104,0.000087982444,0.00052631047,0.0011611376,0.0000347188,0.000058812944],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.0014394652,0.00031285404,0.00030930495,0.0004792601,0.0013487191,0.0010367135,0.00081484293,0.000080166705,0.000054606837],"category_scores_gemma":[0.00011229587,0.0002535298,0.00011526558,0.00011848496,0.00025822624,0.00073671516,0.0006506907,0.00011688969,0.000077808065],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028811133,0.00010831254,0.07130524,0.0001420488,0.00016703235,0.000009414936,0.0003253521,0.0008648639,0.00006349583,0.087905325,0.009669592,0.8291512],"study_design_scores_gemma":[0.0040023015,0.00043125576,0.120852135,0.00013116216,0.00017551756,0.000018683619,0.0016053701,0.30334935,0.00051070174,0.030457336,0.5372152,0.0012510302],"about_ca_topic_score_codex":0.000021180565,"about_ca_topic_score_gemma":0.00002094618,"teacher_disagreement_score":0.8279002,"about_ca_system_score_codex":0.00009753034,"about_ca_system_score_gemma":0.000037576363,"threshold_uncertainty_score":0.9999917},"labels":[],"label_agreement":null},{"id":"W2901090113","doi":"10.1108/bepam-01-2018-0002","title":"BIM-based energy consumption assessment of the on-site construction of building structural systems","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Energy consumption; Structural system; Building information modeling; Key (lock); Productivity; Consumption (sociology); Environmental impact assessment; Computer science; Engineering; Construction engineering; Systems engineering; Civil engineering; Operations management","score_opus":0.011006315260174745,"score_gpt":0.23596213145226239,"score_spread":0.22495581619208765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901090113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93215203,0.000107617685,0.063912116,0.000026989828,0.00076104916,0.00042668614,0.000033005013,0.000049549835,0.002530961],"genre_scores_gemma":[0.9956482,0.00012483793,0.004059398,0.000012620475,0.0000491672,0.00004526844,0.000011402339,0.000011626322,0.0000374582],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991346,0.000046564677,0.00028374512,0.0001663222,0.000249571,0.00011918033],"domain_scores_gemma":[0.99958324,0.000016107873,0.00013014853,0.00023869358,0.000012950391,0.000018877838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000102053906,0.00014150726,0.00014383934,0.00013221095,0.00007867248,0.000024519673,0.00008753622,0.00005139489,0.000045120865],"category_scores_gemma":[0.0000010897222,0.0001070627,0.000047219168,0.00009082951,0.00019533647,0.00006896649,0.00004125251,0.00006227207,0.0000012027854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008815552,0.000116420146,0.15312538,0.0014756084,0.0006609665,0.0000022667662,0.00015197971,0.046053518,0.04340146,0.5951586,0.0008040421,0.15896164],"study_design_scores_gemma":[0.002722928,0.00066178077,0.3261606,0.0007360804,0.00039757224,0.000027505856,0.0006814444,0.5673589,0.07403919,0.0011962906,0.025203295,0.00081440946],"about_ca_topic_score_codex":0.00003791205,"about_ca_topic_score_gemma":0.0000051885004,"teacher_disagreement_score":0.5939623,"about_ca_system_score_codex":0.00007826527,"about_ca_system_score_gemma":0.000007805785,"threshold_uncertainty_score":0.436589},"labels":[],"label_agreement":null},{"id":"W2903256777","doi":"10.1108/bepam-02-2018-0046","title":"Analysis of BIM use for asset management in three public organizations in Québec, Canada","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; HEC Montréal","funders":"","keywords":"Asset (computer security); Building information modeling; Originality; Asset management; Knowledge management; Nuclear decommissioning; Process management; Engineering; Engineering management; Computer science; Business; Operations management","score_opus":0.014407438424904159,"score_gpt":0.21106674948479606,"score_spread":0.1966593110598919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903256777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.926414,0.00016295657,0.06734733,0.00052412425,0.00021754442,0.001756283,0.000116611045,0.00006513124,0.0033960296],"genre_scores_gemma":[0.9965719,0.00031421715,0.0024578776,0.000045432113,0.000014901825,0.00020323289,0.0001157239,0.000016718177,0.0002599796],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99907166,0.000015960857,0.00031615718,0.00022836385,0.00016922562,0.00019860813],"domain_scores_gemma":[0.9996538,0.000020720498,0.000049604823,0.00023373611,0.000013534161,0.000028572733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011951362,0.00014065365,0.0001835214,0.000619143,0.00004303156,0.000044485776,0.00011087011,0.00003782673,0.00009360135],"category_scores_gemma":[0.000005337209,0.00014206585,0.000029676563,0.0008430231,0.000038482733,0.00016175146,0.000066701425,0.000048628208,0.0000015762455],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032881188,0.00026722992,0.82957226,0.0003561737,0.002792119,0.000015106763,0.0002596864,0.014638516,0.00017183388,0.032854505,0.006777342,0.112262346],"study_design_scores_gemma":[0.0008660131,0.000053152296,0.79378843,0.000028400253,0.00047702098,6.862308e-7,0.0007209354,0.07204436,0.00012852867,0.00019160255,0.1313648,0.0003360907],"about_ca_topic_score_codex":0.07070136,"about_ca_topic_score_gemma":0.83058304,"teacher_disagreement_score":0.7598817,"about_ca_system_score_codex":0.00028962246,"about_ca_system_score_gemma":0.00002700144,"threshold_uncertainty_score":0.9354869},"labels":[],"label_agreement":null},{"id":"W3194394674","doi":"10.1108/bepam-11-2020-0180","title":"Integrating risk management's best practices to estimate deep excavation projects’ time and cost","year":2021,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Fault tree analysis; Best practice; Identification (biology); Excavation; Risk management; Risk analysis (engineering); Engineering; Bayesian network; Project management; Estimation; Cost estimate; Computer science; Operations research; Reliability engineering; Systems engineering; Artificial intelligence; Business; Management","score_opus":0.09254565975037203,"score_gpt":0.4649248228798091,"score_spread":0.37237916312943703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3194394674","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6611634,0.001676333,0.016962862,0.008558275,0.00055913796,0.024691816,0.00023309965,0.0002769238,0.28587812],"genre_scores_gemma":[0.36634547,0.04295681,0.38304415,0.0051923646,0.0010903773,0.017655782,0.0025732338,0.00033936522,0.18080243],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9969498,0.0005745658,0.0005378512,0.0007155608,0.0005567622,0.00066547515],"domain_scores_gemma":[0.99853593,0.00040344443,0.00040441836,0.00039651478,0.00004691304,0.00021276073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014416442,0.0002561418,0.00026277103,0.000240522,0.0010806224,0.00008909912,0.00014852767,0.000101311416,0.00030124758],"category_scores_gemma":[0.00020512508,0.00023132487,0.00003191996,0.00030706453,0.00005167319,0.00031361668,0.00084354915,0.00043345973,0.0005125671],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000403588,0.00051836466,0.2251745,0.0026951076,0.00028952153,0.00015678728,0.0017976674,0.0001545022,0.00014045295,0.0058226804,0.005378019,0.7574688],"study_design_scores_gemma":[0.0028616076,0.00057989015,0.43105042,0.0007374451,0.00029422203,0.0000105806375,0.010625759,0.010432289,0.000043978114,0.0006666545,0.54197747,0.0007197067],"about_ca_topic_score_codex":0.00040832203,"about_ca_topic_score_gemma":0.0002557604,"teacher_disagreement_score":0.7567491,"about_ca_system_score_codex":0.00020558388,"about_ca_system_score_gemma":0.00006892262,"threshold_uncertainty_score":0.94331545},"labels":[],"label_agreement":null},{"id":"W3212537810","doi":"10.1108/bepam-04-2021-0063","title":"Framework for identification of performance metrics for research and development collaborations: Construction Innovation Centre","year":2021,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Identification (biology); Originality; Context (archaeology); Knowledge management; Outreach; Computer science; Process management; Engineering management; Management science; Engineering; Qualitative research","score_opus":0.2631372235762758,"score_gpt":0.4285962629288709,"score_spread":0.1654590393525951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212537810","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5043313,0.00030780758,0.49024102,0.00093326374,0.00038294,0.003014982,0.00006583724,0.000025662841,0.000697169],"genre_scores_gemma":[0.69638336,0.0017891093,0.29542902,0.00005349144,0.000081581864,0.0007131699,0.00020380715,0.000020144273,0.0053262976],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973393,0.00007962087,0.0009005812,0.0005861369,0.00084155326,0.00025277334],"domain_scores_gemma":[0.9981893,0.0004900905,0.00039095365,0.00037651838,0.0005229683,0.000030203113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035958134,0.00014281507,0.00020953151,0.0010165365,0.00049849285,0.0002991431,0.00018734609,0.00007672719,0.000039678336],"category_scores_gemma":[0.00046285513,0.00013375576,0.000025795664,0.0019273893,0.000173978,0.00041806424,0.00025941644,0.00008765658,0.0000064625365],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011952373,0.00015434179,0.034219857,0.00045039278,0.00011228266,5.538533e-7,0.0005831518,0.000078291036,0.0004947906,0.23319511,0.0016201674,0.72897154],"study_design_scores_gemma":[0.0018700969,0.00028927426,0.04071161,0.0001166041,0.00008115107,0.0000062497097,0.015855286,0.00801149,0.02204826,0.04626043,0.86428213,0.00046742853],"about_ca_topic_score_codex":0.0000014149426,"about_ca_topic_score_gemma":0.0000045195693,"teacher_disagreement_score":0.86266196,"about_ca_system_score_codex":0.000076750504,"about_ca_system_score_gemma":0.000081942686,"threshold_uncertainty_score":0.54544014},"labels":[],"label_agreement":null},{"id":"W4206913871","doi":"10.1108/bepam-08-2021-0104","title":"Challenges negating virtual construction project team performance in the Middle East","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Team Dynamics and Performance","field":"Psychology","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Durham College","funders":"","keywords":"Virtual team; Originality; Middle East; Project team; Knowledge management; Team effectiveness; Business; Psychological safety; Engineering; Psychology; Computer science; Political science; Creativity","score_opus":0.06219230117728574,"score_gpt":0.2734953304615382,"score_spread":0.21130302928425243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206913871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9271883,0.00052482815,0.000055102988,0.00044298804,0.00030441413,0.0012808753,0.000019884596,0.00003512025,0.07014853],"genre_scores_gemma":[0.9953362,0.0013473926,0.00040057054,0.00016319164,0.0000707035,0.0011617574,0.000037131354,0.00001964084,0.001463444],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983723,0.00020699274,0.0002701842,0.00044835513,0.00034860263,0.00035353497],"domain_scores_gemma":[0.999426,0.0000285666,0.00012683192,0.00039831686,0.0000022054073,0.000018053068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077731156,0.00019644467,0.0001509172,0.00019279428,0.0003685979,0.000044193377,0.000310176,0.000036638306,0.00014835724],"category_scores_gemma":[0.0000015559297,0.00016168982,0.000039388193,0.0001705344,0.00008431946,0.00011764507,0.00035308208,0.00031715192,0.000021641452],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002584802,0.0010713667,0.06847357,0.00025226662,0.00020346617,0.00006110491,0.04088331,0.00111802,0.000027978971,0.040757716,0.0019290393,0.84496367],"study_design_scores_gemma":[0.0023155287,0.0015889416,0.3389511,0.00005389904,0.00007627422,0.00018632943,0.18478514,0.007340442,0.000003348988,0.00016068395,0.4638827,0.0006555887],"about_ca_topic_score_codex":0.000084560066,"about_ca_topic_score_gemma":0.000021354148,"teacher_disagreement_score":0.8443081,"about_ca_system_score_codex":0.000092155926,"about_ca_system_score_gemma":0.000010042329,"threshold_uncertainty_score":0.65935194},"labels":[],"label_agreement":null},{"id":"W4281391534","doi":"10.1108/bepam-12-2021-0150","title":"The new-normal challenges and IPD solutions: a Canadian case study","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Knowledge management; Process management; Project management; Management science; Computer science; Engineering; Sociology; Qualitative research; Systems engineering; Geography","score_opus":0.1087610256947582,"score_gpt":0.3220051485567991,"score_spread":0.21324412286204092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281391534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9289238,0.010266628,0.00030679748,0.01227633,0.00093042373,0.005163613,0.000038851045,0.00009380281,0.0419998],"genre_scores_gemma":[0.980782,0.0042050793,0.00020113615,0.0001688075,0.000063791944,0.00042748917,0.0000037919388,0.00001304255,0.014134881],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972302,0.00030654066,0.00042573866,0.00062804273,0.00093690964,0.00047258663],"domain_scores_gemma":[0.99888027,0.00015086704,0.00014900572,0.00065602554,0.000009776996,0.0001540682],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.0032304488,0.0002060266,0.00017097278,0.0004915828,0.002627323,0.00041407414,0.0004696996,0.000021712493,0.0003300521],"category_scores_gemma":[0.000023280369,0.0001519728,0.000046502413,0.0003025359,0.00012214611,0.00030436777,0.00158352,0.00019049429,0.000028386212],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029029994,0.00009663133,0.008196046,0.00000817282,0.00011967904,0.00053040194,0.0027885777,0.00008536878,7.642096e-7,0.0059453216,0.013832475,0.9683675],"study_design_scores_gemma":[0.0006976588,0.0003036763,0.02130576,0.0000020653129,0.0000586574,0.00039698224,0.095348485,0.0009572664,3.8246958e-7,0.0013400976,0.8793654,0.0002235837],"about_ca_topic_score_codex":0.014084785,"about_ca_topic_score_gemma":0.04289773,"teacher_disagreement_score":0.96814394,"about_ca_system_score_codex":0.000117145544,"about_ca_system_score_gemma":0.00006239413,"threshold_uncertainty_score":0.9986711},"labels":[],"label_agreement":null},{"id":"W4296211515","doi":"10.1108/bepam-11-2021-0138","title":"Analysing value creation in social housing construction in remote communities – application to Nunavik (Canada)","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Causal loop diagram; Value (mathematics); Conceptual framework; Business; SWOT analysis; Supply chain; Indigenous; Environmental economics; Computer science; Environmental resource management; Process management; Architectural engineering; Engineering; Marketing; Economics; Sociology; System dynamics","score_opus":0.011599936635581561,"score_gpt":0.22168192356918293,"score_spread":0.21008198693360136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296211515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97028506,0.000050870793,0.018416429,0.0014890443,0.00017090948,0.0014358469,0.0000056570602,0.00008116963,0.008064985],"genre_scores_gemma":[0.99670154,0.0000313461,0.0021246313,0.0005661143,0.00011956819,0.00019536645,0.000115544965,0.000026157857,0.00011972645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986015,0.00004502659,0.0003181335,0.00030638557,0.00043930407,0.00028966262],"domain_scores_gemma":[0.9996225,0.000013183613,0.00012958648,0.00021928998,0.0000055578384,0.000009853153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005793854,0.0001908164,0.00019785321,0.0007280027,0.00040253933,0.00012995812,0.00019192055,0.00002410931,0.000029597582],"category_scores_gemma":[0.0000035316737,0.00023303667,0.00003146935,0.0006098056,0.000025533753,0.00025228458,0.0006432757,0.00017193009,0.0000042380902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011065977,0.00028093968,0.05268069,0.0004931627,0.00011266785,0.000049206472,0.0007239575,0.6589681,0.00020057421,0.027536577,0.0013371643,0.2575063],"study_design_scores_gemma":[0.0020607777,0.000048037007,0.28383267,0.00010397908,0.00019568631,0.0000033137449,0.02100385,0.43317038,0.000015165735,0.002830217,0.25572824,0.00100767],"about_ca_topic_score_codex":0.2272885,"about_ca_topic_score_gemma":0.027464528,"teacher_disagreement_score":0.25649863,"about_ca_system_score_codex":0.0005881204,"about_ca_system_score_gemma":0.0000142004255,"threshold_uncertainty_score":0.9902817},"labels":[],"label_agreement":null}]}