{"meta":{"query_hash":"6594144cf3b2","filters":{"venue":"Built Environment Project and Asset Management"},"cohort_total":14,"direct_labels_cover":0,"predictions_cover":14,"exported":14,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/6594144cf3b2","api":"https://metacan.xera.ac/api/v1/cohort?venue=Built+Environment+Project+and+Asset+Management"},"results":[{"id":"W1525972495","doi":"10.1108/bepam-03-2013-0004","title":"A game-theoretic model for roadway performance management","year":2014,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Asset (computer security); Asset management; Multitude; Computer science; Game theory; Set (abstract data type); IT asset management; Risk analysis (engineering); Management science; Operations research; Knowledge management; Business; Microeconomics; Economics; Computer security; Engineering; Finance","score_opus":0.018311758078922994,"score_gpt":0.2655456986617421,"score_spread":0.2472339405828191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1525972495","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028917233,0.0007569692,0.9001711,0.0016491704,0.00014148824,0.00028330932,0.0007772123,0.0001656808,0.06713776],"genre_scores_gemma":[0.85866296,0.0010869515,0.10964627,0.00030486254,0.00011260225,0.0007662526,0.00047376516,0.000062187944,0.028884131],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989654,0.0005601822,0.000034525816,0.00015707118,0.0001700362,0.000112834794],"domain_scores_gemma":[0.99924326,0.00041159033,0.00010639707,0.000035802852,0.00012372612,0.00007928823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010921707,0.0011238208,0.0008279533,0.0007557297,0.0007395011,0.0023299307,0.002453307,0.0018273487,0.0081964955],"category_scores_gemma":[0.002061045,0.00041125197,0.00096470205,0.001063219,0.0013993671,0.002174277,0.0012077079,0.0017922514,0.0010206039],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002464035,0.000064036176,0.00048996764,0.00005729217,0.000028475291,0.00015507157,0.00012782228,0.7034516,0.0003407393,0.28920034,0.001631253,0.004428862],"study_design_scores_gemma":[0.000016363556,0.000035167017,0.00015389617,0.000014967032,0.000011800275,0.000035179222,0.00006825975,0.93082565,0.000051627863,0.06466887,0.0041054576,0.000012817496],"about_ca_topic_score_codex":0.016570348,"about_ca_topic_score_gemma":0.013571958,"teacher_disagreement_score":0.016570348,"about_ca_system_score_codex":0.0033719684,"about_ca_system_score_gemma":0.0022964014,"threshold_uncertainty_score":0.03294784},"labels":[],"label_agreement":null},{"id":"W1674731675","doi":"10.1108/bepam-02-2014-0012","title":"An ontology-supported asset information integrator system in infrastructure management","year":2015,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Ontology; Asset (computer security); Knowledge management; Information system; Database transaction; Asset management; Database; Software engineering; Computer security; Engineering; Business","score_opus":0.014785901619107393,"score_gpt":0.24560615925495236,"score_spread":0.23082025763584496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1674731675","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07815666,0.00033786203,0.85518986,0.0014104872,0.00016797188,0.001767804,0.001040741,0.03768182,0.024246758],"genre_scores_gemma":[0.23667294,0.00031285884,0.7474199,0.00039432646,0.000048659927,0.00055824337,0.0026533722,0.0008553888,0.01108427],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975127,0.0006495043,0.000356479,0.00045144444,0.00085250963,0.00017733537],"domain_scores_gemma":[0.9950205,0.0013050196,0.00044664025,0.0015143878,0.0013108723,0.00040266264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057277097,0.0005457823,0.0005479993,0.002430441,0.00096557644,0.0045341104,0.0019856489,0.0012619188,0.004065498],"category_scores_gemma":[0.0094018625,0.00055282575,0.0008602759,0.0016865693,0.0007889858,0.0068421704,0.0038250631,0.0013397537,0.002129517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090822956,0.0019717081,0.027295021,0.0012856637,0.00033027897,0.0031602134,0.0155998925,0.014376357,0.06943545,0.123957224,0.031197188,0.71048284],"study_design_scores_gemma":[0.00026756537,0.0006151975,0.014675816,0.00086256326,0.00050816353,0.0025545207,0.0040432946,0.37353626,0.10654705,0.045554917,0.45039332,0.00044133255],"about_ca_topic_score_codex":0.0038004266,"about_ca_topic_score_gemma":0.0032818303,"teacher_disagreement_score":0.0057277097,"about_ca_system_score_codex":0.0015460809,"about_ca_system_score_gemma":0.003672352,"threshold_uncertainty_score":0.030291378},"labels":[],"label_agreement":null},{"id":"W2031552503","doi":"10.1108/bepam-09-2013-0036","title":"The role of team leadership in achieving LEED certification in a green building project","year":2015,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centennial College","funders":"","keywords":"Certification; Teamwork; Knowledge management; Engineering management; Green building; Engineering; Process management; Computer science; Management; Architectural engineering","score_opus":0.22331975697514045,"score_gpt":0.34677003735195605,"score_spread":0.1234502803768156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031552503","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8571889,0.0009343871,0.04168951,0.006239771,0.00032456822,0.00053308916,0.000026246951,0.00011700792,0.0929465],"genre_scores_gemma":[0.9927626,0.00016466631,0.0052057677,0.000120652614,0.000015904236,0.000070855465,0.0000094200195,0.000008357996,0.0016418366],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.98259336,0.012760089,0.0004333036,0.00047624408,0.0016965411,0.0020404656],"domain_scores_gemma":[0.98322415,0.0059743477,0.0022874328,0.0005953733,0.0026760595,0.0052426136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010602184,0.00025580588,0.00018628172,0.00079533795,0.0036433858,0.0046712286,0.0006907949,0.00081802596,0.0024791213],"category_scores_gemma":[0.013912692,0.00019223997,0.00036070024,0.00041087868,0.0020283773,0.0015474734,0.0041006655,0.0013069535,0.00048177943],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007785564,0.002344208,0.17916122,0.0018192256,0.00023452535,0.0046041114,0.14764385,0.0074787615,0.01305696,0.07487639,0.01570584,0.55229646],"study_design_scores_gemma":[0.00027176458,0.005980529,0.28332183,0.002740199,0.00034405262,0.004761173,0.4362433,0.03632557,0.016048798,0.051288083,0.16231607,0.0003585331],"about_ca_topic_score_codex":0.0013186698,"about_ca_topic_score_gemma":0.002233492,"teacher_disagreement_score":0.010602184,"about_ca_system_score_codex":0.001781478,"about_ca_system_score_gemma":0.0069857915,"threshold_uncertainty_score":0.056070387},"labels":[],"label_agreement":null},{"id":"W2038275092","doi":"10.1108/20441241111143812","title":"Applying just‐in‐time principles in the delivery and management of airport terminal buildings","year":2011,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Context (archaeology); Productivity; Quality (philosophy); Business; Work (physics); Marketing; Operations management; International airport; Transport engineering; Engineering; Process management; Economics","score_opus":0.026072551679239483,"score_gpt":0.2192267643145724,"score_spread":0.1931542126353329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038275092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6849722,0.0028936765,0.15684827,0.013388877,0.0006477941,0.0016091979,0.000085020525,0.00037849206,0.13917655],"genre_scores_gemma":[0.94523257,0.0010821965,0.04585825,0.00063293654,0.00006317465,0.00022532801,0.00003533874,0.000049471477,0.0068206927],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9945098,0.0034592547,0.00034074287,0.0002348283,0.0009910912,0.00046425956],"domain_scores_gemma":[0.9939507,0.0018799847,0.0016361411,0.0006483625,0.0010701123,0.0008147615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004502646,0.00040332292,0.00015964713,0.00084339175,0.0027084886,0.004831338,0.0011204798,0.00077471184,0.0032459109],"category_scores_gemma":[0.007993393,0.00036307832,0.00027803573,0.0008301835,0.0035619845,0.0028904027,0.0035011135,0.0009956055,0.0004149893],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015534495,0.0011070092,0.069726706,0.0027363894,0.00010146834,0.0027451075,0.15315847,0.010420794,0.0142278075,0.10463478,0.013185862,0.6278002],"study_design_scores_gemma":[0.00007244867,0.0029489242,0.119574256,0.0022039113,0.00010030511,0.0028735895,0.35595158,0.012573983,0.0061795716,0.038419653,0.4588088,0.00029301082],"about_ca_topic_score_codex":0.0056062522,"about_ca_topic_score_gemma":0.011829664,"teacher_disagreement_score":0.0056062522,"about_ca_system_score_codex":0.0036001906,"about_ca_system_score_gemma":0.008498954,"threshold_uncertainty_score":0.026121378},"labels":[],"label_agreement":null},{"id":"W2527908636","doi":"10.1108/bepam-10-2015-0056","title":"Analyzing relationships between project team compositions and green building certification in green building projects","year":2016,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Certification; Green building; Project team; Project management; Project stakeholder; Engineering management; Project management triangle; Knowledge management; Engineering; Project charter; Business; Architectural engineering; Computer science; Management; Systems engineering","score_opus":0.03855807610709506,"score_gpt":0.26595830781715574,"score_spread":0.22740023171006069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2527908636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9975727,0.000058887264,0.0007711018,0.00004363303,0.000005309005,0.000047017485,0.000027170014,0.000005404085,0.0014686255],"genre_scores_gemma":[0.99896204,0.000034854405,0.0006141078,0.0000048220813,0.0000026927864,0.00004019791,0.00004044702,0.0000034680452,0.00029724053],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9863171,0.0074162227,0.0009292531,0.0007557167,0.003427445,0.0011543409],"domain_scores_gemma":[0.88729614,0.05773248,0.031896677,0.0028575978,0.013058051,0.0071591325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012030866,0.00030405156,0.0002599298,0.0022450096,0.0015750277,0.0024081145,0.0005606426,0.00035490093,0.0028407492],"category_scores_gemma":[0.06357535,0.00025384472,0.0004267512,0.0016926829,0.00095481495,0.0011399514,0.002456599,0.00087417365,0.00023378515],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014523881,0.00017312316,0.9803884,0.00004371874,0.00006444743,0.00011979866,0.003133442,0.0007460965,0.00014334262,0.00033933454,0.00014925572,0.01455379],"study_design_scores_gemma":[0.000009806233,0.00034186387,0.9757414,0.00008831041,0.00007422,0.00012337936,0.018889666,0.002694217,0.0004601852,0.00050040364,0.0010570118,0.000019510318],"about_ca_topic_score_codex":0.008624174,"about_ca_topic_score_gemma":0.011283392,"teacher_disagreement_score":0.012030866,"about_ca_system_score_codex":0.002240656,"about_ca_system_score_gemma":0.004232132,"threshold_uncertainty_score":0.06362611},"labels":[],"label_agreement":null},{"id":"W2742566035","doi":"10.1108/bepam-11-2016-0061","title":"An eco asset ontology towards effective eco asset management","year":2017,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cumulative Environmental Management Association","funders":"","keywords":"Ontology; Computer science; IT asset management; Asset (computer security); Asset management; Knowledge management; Risk analysis (engineering); Alternative asset; Business; Consumption-based capital asset pricing model; Computer security; Capital asset pricing model; Finance","score_opus":0.01953844444456498,"score_gpt":0.29235903420718057,"score_spread":0.2728205897626156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2742566035","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012741052,0.00061345747,0.9166353,0.0033120562,0.00018439213,0.00038901303,0.00064803206,0.0005489885,0.064927705],"genre_scores_gemma":[0.12261472,0.0013190985,0.86384904,0.0007247031,0.000060296017,0.000478717,0.0016928856,0.00018680269,0.009073808],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9969805,0.0010282831,0.00044047143,0.00030952902,0.0010287726,0.00021242011],"domain_scores_gemma":[0.99671835,0.00083011424,0.0003253668,0.0008457493,0.0010712082,0.00020921987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036996363,0.00051997975,0.00042511575,0.0036948693,0.0015177889,0.005351387,0.001953795,0.0014511973,0.0026254198],"category_scores_gemma":[0.0058234646,0.00044810562,0.0011499089,0.0038172293,0.002924768,0.009472604,0.0039046265,0.0024380253,0.00088398583],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009876515,0.00006352675,0.0014693702,0.00021498838,0.000023702923,0.00023155226,0.0019339075,0.0041318885,0.0016069985,0.928587,0.0053197932,0.056407355],"study_design_scores_gemma":[0.000013699162,0.000027184346,0.0020239167,0.0011607328,0.00006037475,0.00070286816,0.004458134,0.033928715,0.0031153676,0.44212136,0.51232654,0.00006104304],"about_ca_topic_score_codex":0.011351109,"about_ca_topic_score_gemma":0.010750386,"teacher_disagreement_score":0.011351109,"about_ca_system_score_codex":0.0031963259,"about_ca_system_score_gemma":0.007364532,"threshold_uncertainty_score":0.023191094},"labels":[],"label_agreement":null},{"id":"W2777689208","doi":"10.1108/bepam-03-2017-0017","title":"Model for developing trust on US construction projects","year":2017,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Originality; Business; Measure (data warehouse); Phone; Value (mathematics); Integrated project delivery; Knowledge management; Process management; Computer science; Project management; Engineering; Systems engineering; Qualitative research","score_opus":0.19274436991268185,"score_gpt":0.3801893441129762,"score_spread":0.18744497420029438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2777689208","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22105049,0.00043687015,0.6597805,0.005289571,0.00013538614,0.0011195913,0.001025925,0.0005398424,0.110621735],"genre_scores_gemma":[0.93513554,0.00026372116,0.058337416,0.00007686889,0.00001699758,0.00075948937,0.0003690601,0.000022871218,0.0050180946],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99438274,0.0034941516,0.00039118738,0.00051965157,0.0007847171,0.00042752837],"domain_scores_gemma":[0.9876166,0.0067320373,0.0018677459,0.000603721,0.002630688,0.00054914586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005126627,0.00079731777,0.00044614737,0.002696175,0.0013243449,0.0030334655,0.0010833312,0.0011513222,0.0075564934],"category_scores_gemma":[0.021557672,0.00044999097,0.001322028,0.0022463847,0.0016344135,0.004185025,0.002597688,0.0013431496,0.0008213792],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023217931,0.00035142922,0.046248425,0.00040449292,0.00025813957,0.00089369767,0.008553167,0.19806595,0.000632677,0.6558689,0.0066549745,0.081836],"study_design_scores_gemma":[0.00009910287,0.00043887962,0.013379068,0.0005046312,0.00021443285,0.0005527491,0.006326735,0.73658186,0.0005165183,0.21731137,0.023968482,0.00010628324],"about_ca_topic_score_codex":0.020976283,"about_ca_topic_score_gemma":0.017146701,"teacher_disagreement_score":0.020976283,"about_ca_system_score_codex":0.006862013,"about_ca_system_score_gemma":0.0049725375,"threshold_uncertainty_score":0.04978764},"labels":[],"label_agreement":null},{"id":"W2901090113","doi":"10.1108/bepam-01-2018-0002","title":"BIM-based energy consumption assessment of the on-site construction of building structural systems","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Energy consumption; Structural system; Building information modeling; Key (lock); Productivity; Consumption (sociology); Environmental impact assessment; Computer science; Engineering; Construction engineering; Systems engineering; Civil engineering; Operations management","score_opus":0.011006315260174745,"score_gpt":0.23596213145226239,"score_spread":0.22495581619208765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901090113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68188554,0.0001865737,0.2803039,0.00010944164,0.00003236209,0.00034955874,0.0043616886,0.0017110658,0.03105983],"genre_scores_gemma":[0.9331816,0.0001240237,0.0627722,0.000013742731,0.000004338147,0.0001409687,0.0018809964,0.00008967739,0.0017925157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989743,0.00020963223,0.000036806672,0.00007679104,0.0006446157,0.000057810837],"domain_scores_gemma":[0.99932814,0.0001781972,0.00007402898,0.000115719056,0.0002778345,0.00002615439],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007788939,0.00068062736,0.00038594494,0.0029506288,0.00031158718,0.0010153425,0.00063358934,0.00039183776,0.0029627457],"category_scores_gemma":[0.001631886,0.00024543592,0.0005748481,0.0020299444,0.0002132392,0.0010394447,0.00081775314,0.00023062411,0.00090784376],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033803182,0.00062931055,0.06849751,0.0005648392,0.0001506237,0.00025571426,0.0004515035,0.52857924,0.026301906,0.006055966,0.0038885805,0.36428678],"study_design_scores_gemma":[0.0000132423875,0.00017644145,0.05525029,0.00005875077,0.000050063973,0.00016699694,0.00044087676,0.9074187,0.028643932,0.0023694125,0.0053632213,0.000048052934],"about_ca_topic_score_codex":0.0035657843,"about_ca_topic_score_gemma":0.0060722274,"teacher_disagreement_score":0.0035657843,"about_ca_system_score_codex":0.00071129133,"about_ca_system_score_gemma":0.0006492395,"threshold_uncertainty_score":0.009911358},"labels":[],"label_agreement":null},{"id":"W2903256777","doi":"10.1108/bepam-02-2018-0046","title":"Analysis of BIM use for asset management in three public organizations in Québec, Canada","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; HEC Montréal","funders":"","keywords":"Asset (computer security); Building information modeling; Originality; Asset management; Knowledge management; Nuclear decommissioning; Process management; Engineering; Engineering management; Computer science; Business; Operations management","score_opus":0.014407438424904159,"score_gpt":0.21106674948479606,"score_spread":0.1966593110598919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903256777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.988636,0.0001844123,0.0008619734,0.0003922579,0.0000057446696,0.00017459989,0.0005194387,0.000038968312,0.009186599],"genre_scores_gemma":[0.99441624,0.00014208819,0.0011777284,0.000066193505,0.0000015724069,0.000061444414,0.00035134397,0.000014117786,0.0037693456],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99742305,0.00047058586,0.00007031835,0.0002579781,0.00093185244,0.00084635126],"domain_scores_gemma":[0.9934995,0.0012767464,0.00059775275,0.00026896,0.003401074,0.00095601863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025223035,0.00041741625,0.00035684387,0.0021458974,0.007541361,0.002685314,0.0014258709,0.0006269941,0.0037133622],"category_scores_gemma":[0.0053343275,0.0003449997,0.0002651944,0.0046912776,0.0021522462,0.0007075924,0.0019322543,0.0006132664,0.00023194039],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005641785,0.00094295875,0.544431,0.0005371501,0.00012292562,0.0032149341,0.20185046,0.0051107933,0.006311601,0.0077194963,0.010802454,0.21839198],"study_design_scores_gemma":[0.000019454405,0.0001860433,0.7257034,0.00020769463,0.000039511793,0.00017492326,0.23537219,0.004765762,0.0012191935,0.00022598982,0.032021247,0.00006446738],"about_ca_topic_score_codex":0.98883724,"about_ca_topic_score_gemma":0.9960062,"teacher_disagreement_score":0.08468747,"about_ca_system_score_codex":0.08468747,"about_ca_system_score_gemma":0.07149328,"threshold_uncertainty_score":0.6144535},"labels":[],"label_agreement":null},{"id":"W3194394674","doi":"10.1108/bepam-11-2020-0180","title":"Integrating risk management's best practices to estimate deep excavation projects’ time and cost","year":2021,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Fault tree analysis; Best practice; Identification (biology); Excavation; Risk management; Risk analysis (engineering); Engineering; Bayesian network; Project management; Estimation; Cost estimate; Computer science; Operations research; Reliability engineering; Systems engineering; Artificial intelligence; Business; Management","score_opus":0.09254565975037203,"score_gpt":0.4649248228798091,"score_spread":0.37237916312943703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3194394674","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04720557,0.0020725476,0.9389199,0.0016305704,0.000056287143,0.00027569447,0.00016302486,0.00029362418,0.009382713],"genre_scores_gemma":[0.5494163,0.0012012129,0.4477906,0.00010794042,0.000031389212,0.0002206508,0.00013663046,0.000054087453,0.0010411735],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98727775,0.0045091803,0.0011872662,0.0011564353,0.0055000237,0.00036931416],"domain_scores_gemma":[0.9801877,0.008392901,0.0038413939,0.0017496902,0.0054928507,0.00033542252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01235129,0.0015820483,0.0009083145,0.008583594,0.0009814467,0.0048485515,0.002186221,0.0012158059,0.0014953783],"category_scores_gemma":[0.032638047,0.0006702927,0.0010758082,0.0033347937,0.0012431814,0.0048464076,0.0030614617,0.0012915271,0.00029065783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011792889,0.00031060583,0.03578711,0.0009763451,0.00054435356,0.0002461722,0.0028882278,0.33825767,0.0029966687,0.05714315,0.0024310509,0.55830073],"study_design_scores_gemma":[0.000048236896,0.0004053087,0.024934122,0.0015554118,0.00039957333,0.00059432973,0.0055563133,0.79181695,0.0062136427,0.14554954,0.02263776,0.0002887011],"about_ca_topic_score_codex":0.0077270106,"about_ca_topic_score_gemma":0.011713085,"teacher_disagreement_score":0.01235129,"about_ca_system_score_codex":0.004080062,"about_ca_system_score_gemma":0.0055119265,"threshold_uncertainty_score":0.06532067},"labels":[],"label_agreement":null},{"id":"W3212537810","doi":"10.1108/bepam-04-2021-0063","title":"Framework for identification of performance metrics for research and development collaborations: Construction Innovation Centre","year":2021,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Identification (biology); Originality; Context (archaeology); Knowledge management; Outreach; Computer science; Process management; Engineering management; Management science; Engineering; Qualitative research","score_opus":0.2631372235762758,"score_gpt":0.4285962629288709,"score_spread":0.1654590393525951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212537810","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018369092,0.00559067,0.8163606,0.016295698,0.00056656107,0.008108507,0.0023507883,0.0011853882,0.13117269],"genre_scores_gemma":[0.1902837,0.0016111283,0.79547715,0.00058460986,0.00010715967,0.007564119,0.0014353005,0.000145825,0.002791016],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.8420833,0.099176496,0.017324377,0.00727879,0.027247557,0.0068894066],"domain_scores_gemma":[0.8522918,0.07003009,0.018052224,0.008251427,0.044446155,0.006928349],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.1038727,0.003936983,0.0027166645,0.042040847,0.0066974116,0.025691533,0.005975139,0.0058148685,0.0065794727],"category_scores_gemma":[0.11862334,0.0011397392,0.004375512,0.028343882,0.014155295,0.018151851,0.015432432,0.004626287,0.002288341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010227754,0.00030644488,0.010021127,0.0030436881,0.00019213086,0.00020564643,0.009112917,0.008857181,0.00047833635,0.83690304,0.011297339,0.11947988],"study_design_scores_gemma":[0.00017894975,0.00084543787,0.020210607,0.010838936,0.0003955035,0.0008564223,0.035608727,0.044811614,0.0021686493,0.6251524,0.2584231,0.0005096484],"about_ca_topic_score_codex":0.022158071,"about_ca_topic_score_gemma":0.015710328,"teacher_disagreement_score":0.8961273,"about_ca_system_score_codex":0.037599936,"about_ca_system_score_gemma":0.04971669,"threshold_uncertainty_score":0.5493379},"labels":[],"label_agreement":null},{"id":"W4206913871","doi":"10.1108/bepam-08-2021-0104","title":"Challenges negating virtual construction project team performance in the Middle East","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Team Dynamics and Performance","field":"Psychology","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Durham College","funders":"","keywords":"Virtual team; Originality; Middle East; Project team; Knowledge management; Team effectiveness; Business; Psychological safety; Engineering; Psychology; Computer science; Political science; Creativity","score_opus":0.06219230117728574,"score_gpt":0.2734953304615382,"score_spread":0.21130302928425243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206913871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9927584,0.00022175325,0.0003256551,0.00067323516,0.000030278568,0.0000149469115,0.0000061373194,0.0000040053046,0.0059654918],"genre_scores_gemma":[0.9990748,0.00014523577,0.0001483788,0.00009239903,0.0000052674127,0.000008445089,0.00000439162,0.0000024824703,0.0005185393],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99437606,0.0026910787,0.00031865214,0.00030895547,0.0010593352,0.0012458668],"domain_scores_gemma":[0.9894672,0.0029141423,0.0029160494,0.00034319505,0.0014125961,0.0029467675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073943534,0.00035569776,0.00036511163,0.0013356247,0.008288274,0.008034403,0.00088723877,0.00082585623,0.0030890326],"category_scores_gemma":[0.009568036,0.000308807,0.00027710368,0.0011313257,0.005194745,0.0024217304,0.0066305925,0.0011763222,0.00043850578],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047733233,0.00044358283,0.31020856,0.00059918896,0.00010486045,0.0033474672,0.5926561,0.0007738583,0.0028138072,0.017959148,0.004007305,0.06660879],"study_design_scores_gemma":[0.000016384502,0.00024967344,0.1461066,0.0003102741,0.000039665116,0.0006363625,0.83189774,0.0008495857,0.00075978605,0.0023729517,0.01671308,0.000047836365],"about_ca_topic_score_codex":0.01464889,"about_ca_topic_score_gemma":0.02132972,"teacher_disagreement_score":0.01464889,"about_ca_system_score_codex":0.005356313,"about_ca_system_score_gemma":0.007826327,"threshold_uncertainty_score":0.039105594},"labels":[],"label_agreement":null},{"id":"W4281391534","doi":"10.1108/bepam-12-2021-0150","title":"The new-normal challenges and IPD solutions: a Canadian case study","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Knowledge management; Process management; Project management; Management science; Computer science; Engineering; Sociology; Qualitative research; Systems engineering; Geography","score_opus":0.1087610256947582,"score_gpt":0.3220051485567991,"score_spread":0.21324412286204092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281391534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8750284,0.0022515648,0.0061097243,0.010495068,0.0001775045,0.0015685363,0.00087910285,0.00006516613,0.10342486],"genre_scores_gemma":[0.9725475,0.0027059903,0.007716221,0.0008735447,0.000019680452,0.00041148995,0.00020376458,0.000033892236,0.015487834],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99277663,0.002316637,0.00019181872,0.00045033253,0.001981018,0.0022835557],"domain_scores_gemma":[0.9947935,0.0013923106,0.0003661352,0.00034753766,0.0016230667,0.0014775062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005284248,0.00077556947,0.0005885614,0.0028890357,0.027226945,0.005228234,0.0032803814,0.0033034142,0.005292034],"category_scores_gemma":[0.0083745355,0.00051715213,0.00071229396,0.006611837,0.0072979233,0.0020002564,0.0049571525,0.0026217776,0.00043303522],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059605227,0.0013786544,0.079257786,0.0019843187,0.000098307326,0.07761433,0.5095752,0.012063801,0.0045435457,0.12239578,0.051499255,0.13899314],"study_design_scores_gemma":[0.00007067739,0.0003366031,0.03666134,0.0008708446,0.00008049304,0.005393699,0.6671009,0.005004301,0.0013603048,0.0045181927,0.27840948,0.00019312627],"about_ca_topic_score_codex":0.954416,"about_ca_topic_score_gemma":0.97956043,"teacher_disagreement_score":0.08745574,"about_ca_system_score_codex":0.08745574,"about_ca_system_score_gemma":0.115477756,"threshold_uncertainty_score":0.63453877},"labels":[],"label_agreement":null},{"id":"W4296211515","doi":"10.1108/bepam-11-2021-0138","title":"Analysing value creation in social housing construction in remote communities – application to Nunavik (Canada)","year":2022,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Causal loop diagram; Value (mathematics); Conceptual framework; Business; SWOT analysis; Supply chain; Indigenous; Environmental economics; Computer science; Environmental resource management; Process management; Architectural engineering; Engineering; Marketing; Economics; Sociology; System dynamics","score_opus":0.011599936635581561,"score_gpt":0.22168192356918293,"score_spread":0.21008198693360136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296211515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9681654,0.0014962031,0.002579955,0.0008590128,0.00001899273,0.00043741873,0.0007779385,0.000026266347,0.025638772],"genre_scores_gemma":[0.9922814,0.0010042225,0.0037311001,0.0000616968,0.0000024539736,0.00011490504,0.00030375764,0.000009438332,0.0024909952],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99884343,0.00029395428,0.000044670265,0.00011887512,0.0002990305,0.00040004362],"domain_scores_gemma":[0.99620324,0.0013620735,0.0002768326,0.00011298874,0.0016867439,0.00035815613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021959068,0.0004861375,0.00032789237,0.0032605925,0.006106429,0.003648633,0.0009916674,0.00036391136,0.0032475963],"category_scores_gemma":[0.0045265257,0.00021344141,0.0004993744,0.0059780404,0.003218824,0.000932178,0.002711913,0.00068291865,0.00013961596],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032877258,0.00036886276,0.5217288,0.0027381156,0.00017115539,0.0039902083,0.27005747,0.008097247,0.0027539409,0.02472989,0.004007914,0.16102763],"study_design_scores_gemma":[0.000020798396,0.000099424025,0.33046532,0.0011436746,0.00010265349,0.00021732591,0.6378255,0.0050135516,0.0010346072,0.0030376802,0.020969924,0.00006955414],"about_ca_topic_score_codex":0.9851816,"about_ca_topic_score_gemma":0.99198276,"teacher_disagreement_score":0.07760579,"about_ca_system_score_codex":0.07760579,"about_ca_system_score_gemma":0.06917566,"threshold_uncertainty_score":0.5630721},"labels":[],"label_agreement":null}]}