{"meta":{"query_hash":"abfc92598992","filters":{"venue":"Construction Research Congress 2018"},"cohort_total":16,"direct_labels_cover":0,"predictions_cover":16,"exported":16,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/abfc92598992","api":"https://metacan.xera.ac/api/v1/cohort?venue=Construction+Research+Congress+2018"},"results":[{"id":"W2803392990","doi":"10.1061/9780784481295.002","title":"Neighborhood Design and Regional Accessibility of Age-Restricted Communities from Resiliency and Spatial Perspectives","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Migration, Aging, and Tourism Studies","field":"Social Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Recreation; Geography; Population; Geographic information system; Order (exchange); Regional science; Environmental planning; Transport engineering; Business; Sociology; Cartography; Political science; Demography; Engineering","score_opus":0.09650579139051997,"score_gpt":0.38768886647132833,"score_spread":0.2911830750808084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803392990","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99188256,0.0014936113,0.0028058917,0.0006938785,0.00029011135,0.00038881518,0.00002239934,0.00004328578,0.0023794577],"genre_scores_gemma":[0.99530417,0.0023609574,0.0016126017,0.000010050909,0.0004309112,0.000018239994,0.0000042845686,0.00000647098,0.00025229438],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9971766,0.0014422515,0.00022603394,0.0002778339,0.0005934173,0.00028387777],"domain_scores_gemma":[0.9972216,0.0011071564,0.00012241499,0.00024198591,0.0011843791,0.00012249392],"candidate_categories":["sts"],"consensus_categories":["sts"],"category_scores_codex":[0.0010678257,0.00010524689,0.00019922171,0.00021077211,0.0016520428,0.00016749167,0.00022994285,0.00010273849,0.00028778444],"category_scores_gemma":[0.0008542516,0.000097600954,0.000024370125,0.0003230886,0.01134364,0.00032951595,0.00015452052,0.00021895647,0.0000030096487],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050434365,0.00014701928,0.2731486,0.000041577812,0.00016541015,0.0000060116395,0.6447678,5.230469e-7,0.0006021304,0.04360717,0.013232743,0.023776667],"study_design_scores_gemma":[0.0010976512,0.00035685668,0.80234534,0.000103689374,0.00003125404,0.0000043667596,0.120772846,0.0004361742,0.00042454273,0.070053875,0.00411329,0.00026014308],"about_ca_topic_score_codex":0.11317936,"about_ca_topic_score_gemma":0.046283696,"teacher_disagreement_score":0.52919674,"about_ca_system_score_codex":0.00005829968,"about_ca_system_score_gemma":0.0003073066,"threshold_uncertainty_score":0.9996477},"labels":[],"label_agreement":null},{"id":"W2804050855","doi":"10.1061/9780784481295.036","title":"GPR-Based Deterioration Mapping in Subway Networks","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Geophysical Methods and Applications","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Ground-penetrating radar; Spall; Visual inspection; Intrusion; Computer science; Geotechnical engineering; Geology; Forensic engineering; Environmental science; Radar; Engineering; Structural engineering; Artificial intelligence","score_opus":0.06999427170611558,"score_gpt":0.35236201635232106,"score_spread":0.2823677446462055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804050855","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8446163,0.000104496845,0.14716673,0.0002833198,0.0013822205,0.0005563944,0.000008026447,0.00027385584,0.005608687],"genre_scores_gemma":[0.9857036,0.000020449199,0.013587834,0.000017899742,0.0004477711,0.00013392694,0.0000073083697,0.000020308269,0.000060896185],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987792,0.00015455556,0.0002234435,0.00022222075,0.00023417143,0.00038640152],"domain_scores_gemma":[0.9991295,0.00018011365,0.00002443352,0.00029204553,0.00027407784,0.00009986022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058848964,0.000102631864,0.00013274633,0.00025757262,0.00017648519,0.00009538248,0.00015853351,0.00010316778,0.0001839806],"category_scores_gemma":[0.00009955527,0.00010664282,0.00003120061,0.0008200635,0.00055397523,0.0001350811,0.00003387975,0.00032925085,0.00015468623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060312537,0.00011820299,0.017741034,0.00017476082,0.00005295394,0.000012830948,0.0002549298,0.005122619,0.22360645,0.0150995795,0.009201504,0.72855484],"study_design_scores_gemma":[0.0013266399,0.00017592579,0.112913445,0.00027193964,0.000007722481,0.000012144625,0.0004476957,0.8026185,0.015644941,0.008737606,0.05723887,0.00060456776],"about_ca_topic_score_codex":0.00003779318,"about_ca_topic_score_gemma":0.000061544786,"teacher_disagreement_score":0.7974959,"about_ca_system_score_codex":0.00009296791,"about_ca_system_score_gemma":0.000040331583,"threshold_uncertainty_score":0.43487683},"labels":[],"label_agreement":null},{"id":"W2804233164","doi":"10.1061/9780784481295.040","title":"Developing Information Model for Multi-Purpose Utility Tunnel Lifecycle Management","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Constructability; Building information modeling; Construction engineering; Computer science; Transport engineering; Engineering; Systems engineering; Risk analysis (engineering); Scheduling (production processes)","score_opus":0.08800445144773879,"score_gpt":0.355018576373,"score_spread":0.2670141249252612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804233164","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050410748,0.000037373626,0.9409304,0.00012736255,0.0012792089,0.0011855848,0.000049249313,0.0003055764,0.0056744623],"genre_scores_gemma":[0.8815575,0.000054144093,0.11752844,0.000057405974,0.00017755904,0.0002336793,0.000040830597,0.000022795084,0.00032763882],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99827904,0.00006554709,0.0004306915,0.00024481295,0.0003830304,0.0005968767],"domain_scores_gemma":[0.9981899,0.00007239098,0.00004480128,0.0004151496,0.0011390739,0.0001386677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009106868,0.00017465845,0.00017647639,0.00032293826,0.0005066701,0.00020003782,0.00026549946,0.00014746311,0.00011342421],"category_scores_gemma":[0.00020575563,0.00017658566,0.00006274987,0.00035382865,0.00075291534,0.0010174884,0.00012838925,0.00024656797,0.000058537196],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046186932,0.00008713164,0.004377325,0.00296449,0.0004231268,0.0000043731256,0.0027350201,0.004767057,0.00038873183,0.14269324,0.068878494,0.7722191],"study_design_scores_gemma":[0.0009487865,0.000048169313,0.0030506903,0.000036888046,0.000010688955,0.000007943365,0.0014152934,0.90398884,0.0010011863,0.025649212,0.06358891,0.00025339058],"about_ca_topic_score_codex":0.000018194189,"about_ca_topic_score_gemma":0.0000508454,"teacher_disagreement_score":0.8992218,"about_ca_system_score_codex":0.00042372715,"about_ca_system_score_gemma":0.00014565869,"threshold_uncertainty_score":0.7200954},"labels":[],"label_agreement":null},{"id":"W2804734141","doi":"10.1061/9780784481295.014","title":"The USA PPP Payment Mechanisms: A Comparison to the Canadian PPP Systems","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Payment; Business; Toll; Payment service provider; Actuarial science; Finance","score_opus":0.1202277726777342,"score_gpt":0.3634947718361402,"score_spread":0.243266999158406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804734141","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30061963,0.00094917,0.0038012175,0.15354209,0.05545398,0.013955662,0.000088402005,0.00081227,0.4707776],"genre_scores_gemma":[0.9929245,0.000009089565,0.00012294986,0.0008348186,0.0029406832,0.00036402282,0.0000112733105,0.000035623118,0.002757042],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9962225,0.00024049685,0.00042249158,0.0005113693,0.0013513942,0.0012517603],"domain_scores_gemma":[0.9963557,0.00025056105,0.00018828588,0.00096096133,0.0020903181,0.00015417431],"candidate_categories":["sts","scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.004431742,0.00022848585,0.0002261382,0.0006773748,0.0041353097,0.0040021483,0.0013857754,0.00013537555,0.00045366274],"category_scores_gemma":[0.0011820709,0.00014419056,0.00006100602,0.0015872841,0.0012571893,0.0006860589,0.00058247807,0.0005224961,0.006729995],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000804012,0.000024438841,0.012596191,0.0000554174,0.00008669944,0.000009000597,0.0001448203,0.000021829717,0.00023461785,0.57082355,0.40609285,0.009830182],"study_design_scores_gemma":[0.00028309505,0.00004459182,0.0034922275,0.00006702997,0.000014009806,0.000012819424,0.0020573118,0.005613161,0.00024635324,0.0018376497,0.9861151,0.0002166231],"about_ca_topic_score_codex":0.18059778,"about_ca_topic_score_gemma":0.66428953,"teacher_disagreement_score":0.6923049,"about_ca_system_score_codex":0.00046922956,"about_ca_system_score_gemma":0.0005440484,"threshold_uncertainty_score":0.99716115},"labels":[],"label_agreement":null},{"id":"W2885119536","doi":"10.1061/9780784481271.040","title":"Age Related Ethical Lapses in Construction Engineering Site Management Decisions","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Framing (construction); Construction industry; Construction management; Set (abstract data type); Engineering; Knowledge management; Computer science; Management; Economics; Construction engineering","score_opus":0.1503422948264254,"score_gpt":0.4392322085707341,"score_spread":0.2888899137443087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885119536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.903921,0.0001307208,0.004840941,0.0025786073,0.009866274,0.001312539,0.000030719217,0.0003292938,0.07698993],"genre_scores_gemma":[0.9770626,0.00037852832,0.015467602,0.00011631553,0.0004099012,0.000102653525,0.00001654078,0.00003653133,0.006409325],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99286056,0.00073075516,0.0013540688,0.0011366472,0.0030019747,0.0009159951],"domain_scores_gemma":[0.9952449,0.0017017059,0.00025887272,0.001185034,0.0013336828,0.00027578964],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.008197897,0.00030107045,0.0004489873,0.0036892167,0.00075787154,0.0008086139,0.0010041463,0.0004391346,0.003797587],"category_scores_gemma":[0.0039703883,0.00027148903,0.00014453621,0.005392613,0.0031835737,0.0008211904,0.00077060633,0.001542055,0.002799648],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036938794,0.00008972649,0.05745174,0.000041752384,0.00013213698,0.00030490424,0.0008065321,0.0001918755,0.0009886565,0.23679084,0.037949834,0.6648826],"study_design_scores_gemma":[0.0044210358,0.00044540848,0.08843401,0.0006686997,0.000045374083,0.0007912651,0.005907982,0.026705433,0.0014258224,0.084341064,0.7856081,0.0012057993],"about_ca_topic_score_codex":0.00008064902,"about_ca_topic_score_gemma":0.00029509945,"teacher_disagreement_score":0.74765825,"about_ca_system_score_codex":0.00023543336,"about_ca_system_score_gemma":0.00014002669,"threshold_uncertainty_score":0.9999737},"labels":[],"label_agreement":null},{"id":"W2885395152","doi":"10.1061/9780784481271.069","title":"A Framework for Modeling Construction Organizational Competencies and Performance","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Computer science; Organizational performance; Fuzzy logic; Knowledge management; Organizational engineering; Organizational learning; Identification (biology); Artificial intelligence; Management science; Organizational behavior and human resources; Engineering","score_opus":0.22181770195907294,"score_gpt":0.4382395628311331,"score_spread":0.21642186087206014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885395152","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7913776,0.00011329835,0.19670849,0.0011159936,0.0042303777,0.0007993651,0.000037518268,0.00013065763,0.0054866807],"genre_scores_gemma":[0.90093833,0.00019869444,0.09663714,0.00008047308,0.0010133192,0.00007477861,0.000010277646,0.000023152827,0.0010238227],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960201,0.000238079,0.00071314094,0.0007919473,0.0016680207,0.0005687417],"domain_scores_gemma":[0.99339443,0.0011475114,0.00022664615,0.000582158,0.0044662612,0.0001830135],"candidate_categories":["sts","insufficient_payload"],"consensus_categories":["sts"],"category_scores_codex":[0.0037692797,0.00020931293,0.00030131228,0.0010686793,0.0019346882,0.0008063913,0.0005632098,0.00018003143,0.0016972022],"category_scores_gemma":[0.0036828695,0.00018241371,0.000065024666,0.0018627644,0.0033722476,0.0010325583,0.0003436711,0.0003720827,0.0002642416],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004493719,0.00002961252,0.12823221,0.00006844963,0.00007278083,9.704198e-7,0.0005815478,0.000076681725,0.00033199386,0.5158216,0.0047799386,0.34955487],"study_design_scores_gemma":[0.0014771012,0.00072048476,0.005645389,0.00018700665,0.000030723837,0.0003095213,0.007191611,0.49579757,0.0017668824,0.41100517,0.07523373,0.0006347933],"about_ca_topic_score_codex":0.000018767583,"about_ca_topic_score_gemma":0.000028666978,"teacher_disagreement_score":0.4957209,"about_ca_system_score_codex":0.00008080416,"about_ca_system_score_gemma":0.0002809529,"threshold_uncertainty_score":0.9993647},"labels":[],"label_agreement":null},{"id":"W2885495497","doi":"10.1061/9780784481271.006","title":"Achieving Agency Goals in Public-Private Partnerships through Key Performance Indicators: Application of Existing Contract and Specification Theory","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Performance indicator; Flexibility (engineering); Agency (philosophy); Process management; Business; Performance management; Performance measurement; Risk analysis (engineering); Economics; Marketing","score_opus":0.19642811790912612,"score_gpt":0.36924715661802865,"score_spread":0.17281903870890253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885495497","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9410779,0.0001477268,0.000867127,0.0008718552,0.0003598889,0.0008653258,0.0000037293134,0.00010914854,0.05569731],"genre_scores_gemma":[0.997691,0.00010440159,0.0009703198,0.000086975306,0.0008508416,0.00014037408,0.00003058141,0.000035478595,0.00009004337],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9969555,0.00026478295,0.00068695715,0.0006417698,0.0007377541,0.0007131958],"domain_scores_gemma":[0.99744797,0.00037071924,0.00061813806,0.0006165517,0.0008963555,0.000050243554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005110238,0.00023145262,0.00031993203,0.001315073,0.0005183468,0.0004929103,0.00058673765,0.00018852248,0.0002115322],"category_scores_gemma":[0.0022212642,0.00022997336,0.0000431294,0.0022371388,0.0019691617,0.0033341271,0.0004086404,0.000500568,0.00016799226],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001549278,0.000073800744,0.33971673,0.00028824585,0.000027904114,0.0000015704097,0.00030846908,7.994774e-7,0.006935812,0.55571795,0.00023378515,0.096540004],"study_design_scores_gemma":[0.0030923067,0.00015639525,0.7085904,0.0007044323,0.00004678759,0.000027721133,0.0026269436,0.006461587,0.011289705,0.03340247,0.23256482,0.001036419],"about_ca_topic_score_codex":0.00010446189,"about_ca_topic_score_gemma":0.00007150374,"teacher_disagreement_score":0.5223155,"about_ca_system_score_codex":0.00012327153,"about_ca_system_score_gemma":0.00012023291,"threshold_uncertainty_score":0.93780416},"labels":[],"label_agreement":null},{"id":"W2885599890","doi":"10.1061/9780784481288.047","title":"Reaction Time Optimization Based on Sensor Data-Driven Simulation for Snow Removal Projects","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Truck; Snow; Computer science; Global Positioning System; Snow removal; Real-time computing; Software; Real-time data; Environmental science; Track (disk drive); Simulation; Meteorology; Automotive engineering; Engineering","score_opus":0.11514414012687699,"score_gpt":0.39234901595416,"score_spread":0.27720487582728304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885599890","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077311597,0.000012471089,0.9791189,0.00023595664,0.002137596,0.0019550736,0.00017199712,0.0008911426,0.007745721],"genre_scores_gemma":[0.18260445,0.000023648794,0.8132225,0.00005586706,0.0017473268,0.0001470141,0.0009312493,0.00017182679,0.001096089],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974166,0.00044729217,0.000402079,0.00058273703,0.0006578598,0.0004934419],"domain_scores_gemma":[0.9962363,0.001164896,0.00011137926,0.00094961654,0.0014000317,0.00013777599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019031496,0.00021184882,0.00022428588,0.0007804142,0.0004730814,0.00018269994,0.0003398779,0.00023723894,0.00018925103],"category_scores_gemma":[0.002799243,0.00022903834,0.000048832553,0.0009286287,0.0004352364,0.00054579397,0.00007511571,0.00031315975,0.0001604526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002483192,0.000025038256,0.000069344744,0.00005290169,0.00003157249,0.0000020239108,0.000038194677,0.97299343,0.0029955595,0.00008885134,0.004317966,0.019136803],"study_design_scores_gemma":[0.001297311,0.0001927085,0.000054247466,0.00010770693,0.000019173993,0.000014121627,0.000058491212,0.98599565,0.001715569,0.00003167429,0.010285676,0.00022765575],"about_ca_topic_score_codex":0.0000073097135,"about_ca_topic_score_gemma":0.000003089947,"teacher_disagreement_score":0.17487329,"about_ca_system_score_codex":0.0002858809,"about_ca_system_score_gemma":0.0001569353,"threshold_uncertainty_score":0.93399125},"labels":[],"label_agreement":null},{"id":"W2886510544","doi":"10.1061/9780784481288.060","title":"A Comparison of Safety Climate and Safety Performance between Ontario’s Residential and Heavy Civil Construction Sectors","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hudbay Minerals (Canada); University of Toronto","funders":"","keywords":"Occupational safety and health; Work (physics); Fire safety; Environmental health; Business; Transport engineering; Engineering; Medicine; Civil engineering","score_opus":0.13000346454016395,"score_gpt":0.4902249062710232,"score_spread":0.36022144173085924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886510544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98490804,0.00020216333,0.0001625262,0.0007034976,0.0017423406,0.001606682,0.0002094012,0.00005983217,0.010405538],"genre_scores_gemma":[0.99576616,0.0009249026,0.0017087122,0.000028419538,0.000839978,0.00008096156,0.0000700889,0.000028922832,0.00055182923],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9940211,0.0015895743,0.0013327904,0.0006338679,0.0012117424,0.0012108805],"domain_scores_gemma":[0.9944947,0.0020141192,0.00041473945,0.00046065723,0.0020401077,0.00057571445],"candidate_categories":["sts","insufficient_payload"],"consensus_categories":["sts"],"category_scores_codex":[0.0044430946,0.00023979138,0.0006628583,0.00061267824,0.0036883585,0.000044266504,0.00023377973,0.0004188763,0.0018828205],"category_scores_gemma":[0.0006701635,0.00022770198,0.00004998661,0.0006049106,0.0045069214,0.00045413832,0.00050887815,0.0017011663,0.00012079368],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00363145,0.000025922227,0.9510411,0.0007396832,0.000045102006,9.518648e-7,0.0013557732,6.5466577e-7,0.00009312469,0.0025841508,0.0013889705,0.03909309],"study_design_scores_gemma":[0.0021511398,0.0007438108,0.9689956,0.000606497,0.000022299972,0.000021068796,0.0022998652,0.00041161673,0.0004934474,0.00045955746,0.023584105,0.00021103249],"about_ca_topic_score_codex":0.008350781,"about_ca_topic_score_gemma":0.03154496,"teacher_disagreement_score":0.038882058,"about_ca_system_score_codex":0.00054227374,"about_ca_system_score_gemma":0.0018452591,"threshold_uncertainty_score":0.9990296},"labels":[],"label_agreement":null},{"id":"W2886644990","doi":"10.1061/9780784481271.062","title":"Chaos and Complexity in Modeling and Detection of Spatial Temporal Clashes in Construction Processes","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Computer science; Chaotic; Crew; Sensitivity (control systems); Variable (mathematics); Stochastic process; Scheduling (production processes); Stochastic modelling; Mathematical optimization; Simulation; Industrial engineering; Operations research; Artificial intelligence; Mathematics; Engineering","score_opus":0.07628720370253153,"score_gpt":0.31401790003296814,"score_spread":0.2377306963304366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886644990","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.985932,0.0003569857,0.011782037,0.00004515453,0.00074075884,0.0003127751,0.000011908217,0.00006899257,0.0007493766],"genre_scores_gemma":[0.99800014,0.000353041,0.0014356853,0.0000022964105,0.00014192908,0.000039315746,0.000004571108,0.00001476637,0.0000082510405],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986421,0.00011992922,0.00041712256,0.0002844974,0.0002674047,0.00026895612],"domain_scores_gemma":[0.99918103,0.00007034433,0.000055709956,0.00013688058,0.0004822886,0.000073736395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046120535,0.00014208398,0.00022683966,0.00070944475,0.00012975748,0.00006526089,0.0000692342,0.0001713032,0.00004431211],"category_scores_gemma":[0.00016071158,0.00015021839,0.000015282076,0.0005695847,0.0018787178,0.00040132657,0.00004296328,0.00036312747,0.0000031743932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005335417,0.00006559066,0.28406206,0.001215069,0.000061967876,0.000006227833,0.0014658837,0.00082814606,0.038842447,0.006717631,0.00005372126,0.6661477],"study_design_scores_gemma":[0.0024255882,0.0003542713,0.027030915,0.000600688,0.000013241505,0.00034964754,0.005143085,0.89004725,0.053288408,0.019666312,0.0005887608,0.0004918117],"about_ca_topic_score_codex":0.0013820291,"about_ca_topic_score_gemma":0.017833218,"teacher_disagreement_score":0.8892191,"about_ca_system_score_codex":0.000093046634,"about_ca_system_score_gemma":0.00008734552,"threshold_uncertainty_score":0.9951354},"labels":[],"label_agreement":null},{"id":"W2886736786","doi":"10.1061/9780784481288.062","title":"Developing a Cost-Effective and Adaptive Training Program to Enhance Construction Safety in Tunneling Construction","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Training (meteorology); Work (physics); Engineering; Construction site safety; Session (web analytics); Computer science; Risk analysis (engineering); Transport engineering; Business","score_opus":0.20194075706454143,"score_gpt":0.5525759936839773,"score_spread":0.35063523661943585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886736786","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8855326,0.00032307993,0.041422952,0.008126362,0.008592947,0.03485014,0.0002149015,0.0005608724,0.020376116],"genre_scores_gemma":[0.8919583,0.00045341896,0.09594273,0.00033331328,0.0016599338,0.009154184,0.000052395102,0.000077715966,0.0003680011],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99200267,0.0027249749,0.0011608117,0.0011072139,0.0011249112,0.0018794128],"domain_scores_gemma":[0.9921521,0.003091592,0.0002863098,0.00042090545,0.003320103,0.0007289818],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":["sts"],"category_scores_codex":[0.005533762,0.0003376185,0.000595539,0.0013633034,0.0030419247,0.00008493036,0.00028571903,0.0004823856,0.00043915966],"category_scores_gemma":[0.0034842808,0.00034387605,0.00005633751,0.002226951,0.0030905113,0.00058200944,0.00038458643,0.002137601,0.0004024362],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023917288,0.00003480882,0.04165286,0.00022123131,0.000038662976,0.000009395753,0.0025238723,0.0000062195186,0.00028779867,0.024506774,0.0003261398,0.9280005],"study_design_scores_gemma":[0.012200105,0.0069932216,0.49048665,0.0104161985,0.00005920501,0.0007036934,0.13854271,0.017706007,0.0043567745,0.032739878,0.28291664,0.002878927],"about_ca_topic_score_codex":0.0007095303,"about_ca_topic_score_gemma":0.0016542155,"teacher_disagreement_score":0.9251216,"about_ca_system_score_codex":0.0016620816,"about_ca_system_score_gemma":0.0027316713,"threshold_uncertainty_score":0.99990135},"labels":[],"label_agreement":null},{"id":"W2887324060","doi":"10.1061/9780784481271.068","title":"Quantifying the Impact of Change on the Progress of Construction Projects","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scope (computer science); Earned value management; Schedule; Change order; Project management; Value engineering; Baseline (sea); Computer science; Construction management; Quality (philosophy); Change management (ITSM); Engineering; Risk analysis (engineering); Project planning; Systems engineering; Operations management; Civil engineering; Project charter; Business","score_opus":0.5998759696896633,"score_gpt":0.5340393017317845,"score_spread":0.06583666795787879,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887324060","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9838413,0.00013673636,0.00010422171,0.0017247224,0.002284548,0.0015956188,0.000039140603,0.000038869177,0.0102348365],"genre_scores_gemma":[0.99853945,0.00008900514,0.0003666903,0.000023916326,0.0005135014,0.00013124912,0.0000021122423,0.000014725852,0.0003193647],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9941681,0.0012098582,0.00090100063,0.00054235506,0.0026494141,0.000529245],"domain_scores_gemma":[0.9922721,0.0019548025,0.00080388185,0.0013691931,0.003512089,0.00008792726],"candidate_categories":["sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.008445541,0.00022069298,0.0003703361,0.001078276,0.0009773739,0.000306926,0.0013613985,0.000120663346,0.0019437963],"category_scores_gemma":[0.0024962623,0.000106689666,0.00024767284,0.0034507047,0.010619283,0.000597029,0.00039494943,0.000498901,0.0001987513],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007008334,0.00009644661,0.353482,0.00004529077,0.00019908206,0.0000019518338,0.0018880764,0.0000058794103,0.0009084918,0.08386486,0.019576196,0.5392309],"study_design_scores_gemma":[0.0050219265,0.008661589,0.6659777,0.0015835033,0.00014844236,0.0006291918,0.064986415,0.029889401,0.08563893,0.051392026,0.0844542,0.0016166655],"about_ca_topic_score_codex":0.00034917553,"about_ca_topic_score_gemma":0.00009687349,"teacher_disagreement_score":0.5376142,"about_ca_system_score_codex":0.000083359264,"about_ca_system_score_gemma":0.0003508179,"threshold_uncertainty_score":0.99896854},"labels":[],"label_agreement":null},{"id":"W2887697636","doi":"10.1061/9780784481264.003","title":"Recommender System for Improving BIM Efficiency: An Interior Finishing Case Study","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Recommender system; Computer science; World Wide Web","score_opus":0.06519546889621741,"score_gpt":0.3512973582163273,"score_spread":0.2861018893201099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887697636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9331306,0.00007280759,0.05460198,0.00003643718,0.008449782,0.0012452062,0.000039524024,0.0006642057,0.0017594481],"genre_scores_gemma":[0.9962129,0.0000029671671,0.0024379655,0.0000075389044,0.00087550713,0.00031888604,0.000007207374,0.000048508657,0.0000885097],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792486,0.00025100782,0.0004630199,0.00045948077,0.00037037247,0.000531264],"domain_scores_gemma":[0.998008,0.00017517175,0.00007263134,0.0004927481,0.0010549332,0.00019648962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013435143,0.0002086312,0.00022995542,0.00048109886,0.0008894018,0.00046730458,0.00026378848,0.00015856921,0.00015592799],"category_scores_gemma":[0.00016151511,0.00020311073,0.00006277737,0.00046102132,0.00057385257,0.0006394573,0.00007196941,0.0004053869,0.000052763262],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002678127,0.0001737759,0.0036360235,0.0006774107,0.0002529836,0.0002795732,0.0044701505,0.00012018553,0.017497705,0.009983933,0.004614862,0.9580256],"study_design_scores_gemma":[0.005366639,0.0043254388,0.00033055266,0.00038289186,0.0001372449,0.014161232,0.3367782,0.5840837,0.034235287,0.000687178,0.018020488,0.0014911555],"about_ca_topic_score_codex":0.0003175766,"about_ca_topic_score_gemma":0.0006875872,"teacher_disagreement_score":0.95653445,"about_ca_system_score_codex":0.00030702035,"about_ca_system_score_gemma":0.00011478016,"threshold_uncertainty_score":0.8282615},"labels":[],"label_agreement":null},{"id":"W2895430233","doi":"10.1061/9780784481301.057","title":"Improved Target-Value Design Approach through the Integration of Environmental Performance and Reliability Theory","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College Saint-Jean; University of Alberta","funders":"","keywords":"Interdependence; Computer science; Stakeholder; Process management; Building information modeling; Value engineering; Activity-based costing; Systems engineering; Risk analysis (engineering); Engineering; Business; Operations management; Scheduling (production processes)","score_opus":0.028512684103118083,"score_gpt":0.2715133520780976,"score_spread":0.24300066797497955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895430233","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5744866,0.000521794,0.40944567,0.00009263351,0.0017596323,0.0010535896,0.000040208077,0.00016053779,0.012439306],"genre_scores_gemma":[0.97817487,0.00027683305,0.0210459,0.000009270223,0.00017876418,0.00007845106,0.0000074381887,0.000017488488,0.00021099672],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984754,0.00039165866,0.0003028706,0.00025394963,0.0003231964,0.00025292573],"domain_scores_gemma":[0.9991303,0.00019917924,0.000061573795,0.00036679703,0.0001895901,0.00005253539],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.0012278461,0.00014471344,0.00014872421,0.00009900357,0.00036731362,0.000061720406,0.00018046043,0.0001344272,0.00023131541],"category_scores_gemma":[0.00012098759,0.000103912425,0.000036397647,0.00023243474,0.003388901,0.00042332665,0.00005363869,0.00038957936,0.000014947812],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085888116,0.0001517792,0.0037560316,0.00032917465,0.00023040664,6.5137846e-7,0.005269459,0.0017207488,0.21590497,0.112625994,0.0055178385,0.6536341],"study_design_scores_gemma":[0.0011035235,0.00067801826,0.008545377,0.00010744015,0.000044393342,0.00016879117,0.009464936,0.61175215,0.33106023,0.027660541,0.008928526,0.0004860848],"about_ca_topic_score_codex":0.000019801388,"about_ca_topic_score_gemma":0.0000016583417,"teacher_disagreement_score":0.653148,"about_ca_system_score_codex":0.0000968904,"about_ca_system_score_gemma":0.000049242437,"threshold_uncertainty_score":0.9993233},"labels":[],"label_agreement":null},{"id":"W2895576682","doi":"10.1061/9780784481301.031","title":"Analysis of BIoT-Based Energy Business in the City of Montreal—Lessons Learned for Broader Markets","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"IoT-based Smart Home Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Biot number; The Internet; Business model; Computer science; Automation; Architectural engineering; World Wide Web; Data science; Business; Engineering; Marketing; Mechanical engineering","score_opus":0.0703381463686373,"score_gpt":0.3492380956794532,"score_spread":0.27889994931081585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895576682","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97276306,0.00037273104,0.019206505,0.0006347997,0.001400798,0.0007815985,0.00038785674,0.00009302776,0.004359601],"genre_scores_gemma":[0.999154,0.000043450593,0.0003695039,0.000009584414,0.00013586745,0.000110833906,0.00004187971,0.000025350591,0.000109570996],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9975878,0.00046835103,0.0005344038,0.0003010754,0.00064947817,0.0004588628],"domain_scores_gemma":[0.99677265,0.0008879455,0.00012886059,0.0006855244,0.0014543677,0.00007065696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001970342,0.00016765587,0.00048296468,0.001572419,0.000128767,0.00004422257,0.00044634697,0.00018080897,0.00017076197],"category_scores_gemma":[0.0004989844,0.00013860995,0.0001564133,0.0036425102,0.0013114343,0.00011308866,0.0000402329,0.0001883642,0.0000034642246],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0049269064,0.0013189367,0.37544125,0.0049158847,0.009452686,0.00004896416,0.0036529277,0.029168062,0.1188714,0.022206733,0.058950137,0.37104613],"study_design_scores_gemma":[0.0050405166,0.00037667766,0.4772443,0.0005445001,0.0005528657,0.0000126655395,0.0026133822,0.39994067,0.08264885,0.0009196631,0.029310418,0.0007954936],"about_ca_topic_score_codex":0.0019591916,"about_ca_topic_score_gemma":0.0036498194,"teacher_disagreement_score":0.37077263,"about_ca_system_score_codex":0.000101346566,"about_ca_system_score_gemma":0.00017713134,"threshold_uncertainty_score":0.56523496},"labels":[],"label_agreement":null},{"id":"W2895744198","doi":"10.1061/9780784481301.025","title":"Can “EDGE” be the Solution to Sustainability of Buildings in Colombian Market?","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Operability; Upgrade; Environmental economics; Energy consumption; Sustainability; Market penetration; Efficient energy use; Excellence; Enhanced Data Rates for GSM Evolution; Business; Architectural engineering; Computer science; Engineering; Marketing; Economics; Telecommunications","score_opus":0.02772112716527856,"score_gpt":0.3299502607866815,"score_spread":0.3022291336214029,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895744198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98047674,0.000116679556,0.003885558,0.0052670366,0.0014602918,0.0015358786,0.000019623689,0.00014464946,0.007093542],"genre_scores_gemma":[0.9981379,0.000026397915,0.00076220196,0.00003209007,0.00014434617,0.00012845163,0.000001674113,0.000021570368,0.00074540626],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979012,0.000312667,0.0003272788,0.00028570928,0.00051445095,0.0006586656],"domain_scores_gemma":[0.99781716,0.00029165976,0.000039021885,0.00046358825,0.001242428,0.00014611987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023765145,0.00013810837,0.0001978584,0.00047186838,0.00024532218,0.00008454199,0.00037227813,0.00011130703,0.00027831126],"category_scores_gemma":[0.00086122187,0.00012181782,0.00004199257,0.0011538767,0.0012420858,0.00013203712,0.00015860367,0.0003651409,0.0000068388026],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090507366,0.00030983152,0.08004091,0.0015069939,0.0002659321,0.0000682649,0.0051759426,0.0023036762,0.036171265,0.053336836,0.536781,0.28313425],"study_design_scores_gemma":[0.0048265983,0.0023005651,0.12232456,0.00085631973,0.00006511374,0.00012974281,0.05744568,0.07239165,0.13445564,0.054690596,0.54862285,0.0018907023],"about_ca_topic_score_codex":0.00069059443,"about_ca_topic_score_gemma":0.0005000404,"teacher_disagreement_score":0.28124353,"about_ca_system_score_codex":0.000976949,"about_ca_system_score_gemma":0.00039972126,"threshold_uncertainty_score":0.49675867},"labels":[],"label_agreement":null}]}