{"meta":{"query_hash":"2db488d6be06","filters":{"venue":"Contemporary Chemical Industry"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/2db488d6be06","api":"https://metacan.xera.ac/api/v1/cohort?venue=Contemporary+Chemical+Industry"},"results":[{"id":"W2354488977","doi":"","title":"Industrialization Progress in Cellulosic Fuel-ethanol Around the World","year":2014,"lang":"en","type":"article","venue":"Contemporary Chemical Industry","topic":"Biofuel production and bioconversion","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cellulosic ethanol; Fossil fuel; Industrialisation; Alternative fuels; Raw material; Waste management; Ethanol fuel; Biofuel; Natural resource economics; Environmental science; Engineering; Economics; Chemistry; Cellulose","score_opus":0.032830333059594284,"score_gpt":0.23919352129892146,"score_spread":0.20636318823932717,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2354488977","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7522039,0.120126374,0.014128175,0.0050915685,0.00039870015,0.000068889836,0.00051815406,0.00017652841,0.10728778],"genre_scores_gemma":[0.87475526,0.099422194,0.014744793,0.00075135636,0.00011680293,0.000014642149,0.00059112423,0.000025038931,0.009578817],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998704,0.000012733666,0.0000134136935,0.00004032635,0.000038643506,0.000024379638],"domain_scores_gemma":[0.9997483,0.000029049468,0.000050142506,0.00001686451,0.00013564673,0.000019959753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004076524,0.00028614773,0.0000920958,0.0008776694,0.00035664477,0.0011924589,0.00014214436,0.00033759704,0.0011691249],"category_scores_gemma":[0.00037367092,0.00008700643,0.00021088708,0.0016619136,0.0002610203,0.0009099095,0.0003007531,0.00039480682,0.00028548174],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020386698,0.00015821356,0.045506816,0.0010785895,0.000056407407,0.0015875669,0.0011912017,0.0027057175,0.09666796,0.032893598,0.0031058427,0.8148442],"study_design_scores_gemma":[0.000019987063,0.00045089526,0.15884055,0.0008164635,0.00021911305,0.003051482,0.00397128,0.0018795,0.19093497,0.008089135,0.63164055,0.00008612999],"about_ca_topic_score_codex":0.0044009318,"about_ca_topic_score_gemma":0.0060548526,"teacher_disagreement_score":0.0044009318,"about_ca_system_score_codex":0.0010682477,"about_ca_system_score_gemma":0.0014290872,"threshold_uncertainty_score":0.0087506175},"labels":[],"label_agreement":null},{"id":"W2363493011","doi":"","title":"Study on Selection of Project Contractors Based on CBR","year":2010,"lang":"en","type":"article","venue":"Contemporary Chemical Industry","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Bidding; Intellectualization; Procurement; Construction bidding; Frame (networking); Expert system; Selection (genetic algorithm); Tacit knowledge; Function (biology); Process (computing); Project management; Operations research; Knowledge management; Computer science; Engineering; Business; Systems engineering; Artificial intelligence; Project planning; Pre-construction services","score_opus":0.07391359729884989,"score_gpt":0.3137753010708767,"score_spread":0.2398617037720268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2363493011","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3684526,0.0047467286,0.5677506,0.002154418,0.00022512452,0.0010177536,0.00015435736,0.00037167023,0.05512678],"genre_scores_gemma":[0.87801576,0.0025668528,0.111756876,0.00021523543,0.00011281214,0.00022928545,0.00019998477,0.000042598225,0.0068605766],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9923923,0.004724871,0.00026425507,0.0005628972,0.001622477,0.00043312932],"domain_scores_gemma":[0.992766,0.0054523083,0.00025441695,0.0003245526,0.0010413245,0.00016129523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00519236,0.0004564534,0.00087864924,0.0023276405,0.0007980874,0.0017753028,0.0014363048,0.0008378165,0.0025148247],"category_scores_gemma":[0.016266577,0.00028636822,0.000511693,0.0029071593,0.00052040216,0.0020267207,0.0004737818,0.000718322,0.00029914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005351312,0.0009539067,0.019919455,0.0010276581,0.00018139486,0.0009834172,0.0025444804,0.12817286,0.004758364,0.08925546,0.007847131,0.7438208],"study_design_scores_gemma":[0.00020370395,0.00042583223,0.008064361,0.00023954925,0.0001491547,0.0007964517,0.0021764229,0.9388493,0.004465063,0.0248665,0.019686367,0.00007732873],"about_ca_topic_score_codex":0.006546425,"about_ca_topic_score_gemma":0.003340501,"teacher_disagreement_score":0.006546425,"about_ca_system_score_codex":0.0011532085,"about_ca_system_score_gemma":0.001363143,"threshold_uncertainty_score":0.027460098},"labels":[],"label_agreement":null},{"id":"W2372564888","doi":"","title":"Application of PDMS in Buried Supply and Drainage Pipeline Design for Petrochemical Plants","year":2014,"lang":"en","type":"article","venue":"Contemporary Chemical Industry","topic":"Geological Modeling and Analysis","field":"Earth and Planetary Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Petrochemical; Pipeline (software); Engineering; Drainage; Software; Software design; Process (computing); Petroleum engineering; Systems engineering; Civil engineering; Computer science; Software development; Environmental engineering; Mechanical engineering","score_opus":0.03876124432907899,"score_gpt":0.2380177045939178,"score_spread":0.19925646026483881,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2372564888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015446922,0.0001601345,0.97182006,0.00010819856,0.00004880111,0.00005816792,0.00028698478,0.0046793767,0.0073913196],"genre_scores_gemma":[0.28913435,0.0007080821,0.6980741,0.00011577458,0.000023290635,0.00017063948,0.00091257296,0.0010570174,0.009804148],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962723,0.000045182926,0.000028002083,0.00005223442,0.00022115052,0.000026134836],"domain_scores_gemma":[0.99976534,0.000075763906,0.000022481685,0.00005030588,0.00007307089,0.00001295997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033717454,0.0006981988,0.00034760218,0.0005604143,0.000322415,0.00057287246,0.0007235552,0.00034872856,0.006408626],"category_scores_gemma":[0.0008332375,0.00049601775,0.00076873566,0.000511785,0.00028789605,0.0005875889,0.0007645221,0.00043475957,0.00088247133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018358437,0.000080946615,0.006992571,0.0009891273,0.000079930505,0.0006324594,0.00077931286,0.29585463,0.12130514,0.031472836,0.011469634,0.5301598],"study_design_scores_gemma":[0.00009028577,0.00025388738,0.0023340525,0.000107429194,0.00010428613,0.001028391,0.00018439986,0.64385676,0.14094926,0.010716393,0.20029588,0.00007898332],"about_ca_topic_score_codex":0.0023368986,"about_ca_topic_score_gemma":0.0025024263,"teacher_disagreement_score":0.006408626,"about_ca_system_score_codex":0.00035876193,"about_ca_system_score_gemma":0.0010063334,"threshold_uncertainty_score":0.021439016},"labels":[],"label_agreement":null}]}