{"meta":{"query_hash":"402593bca13b","filters":{"venue":"Dianli xitong zidonghua"},"cohort_total":4,"direct_labels_cover":0,"predictions_cover":4,"exported":4,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/402593bca13b","api":"https://metacan.xera.ac/api/v1/cohort?venue=Dianli+xitong+zidonghua"},"results":[{"id":"W2348512057","doi":"","title":"Progresses on Algorithm of Electromagnetic Transient Simulation for Electric Power System","year":2009,"lang":"en","type":"article","venue":"Dianli xitong zidonghua","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Transient (computer programming); Electric power system; Transient analysis; Algorithm; Computer science; Electromagnetic simulation; Computational electromagnetics; Power (physics); Extension (predicate logic); Electromagnetic compatibility; Electromagnetic field; Electronic engineering; Engineering; Transient response; Electrical engineering; Physics","score_opus":0.006865637845182256,"score_gpt":0.2315297944208529,"score_spread":0.22466415657567063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2348512057","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017210861,0.0010262501,0.9903072,0.00014888615,0.0001282807,0.000025141293,0.000035305166,0.00043437674,0.0061734384],"genre_scores_gemma":[0.17497234,0.01445775,0.7937955,0.00027890108,0.0005849749,0.0003644796,0.0007768205,0.00089764514,0.013871606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993123,0.00022345361,0.00005651484,0.00011030469,0.00026700748,0.000030529252],"domain_scores_gemma":[0.99963415,0.00013540946,0.00001898328,0.0000521827,0.00014706817,0.000012250264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006694289,0.00082662026,0.00067755935,0.0008270465,0.0005679687,0.00091198436,0.0009988273,0.00062903756,0.004745364],"category_scores_gemma":[0.0015128923,0.00032038594,0.00081135123,0.0012109113,0.00053550967,0.0017145346,0.0006800749,0.0012722386,0.0015058137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010974926,0.00006385764,0.0013678558,0.00050819607,0.00007780584,0.00014984715,0.00027190053,0.43541864,0.008298347,0.19013093,0.009868698,0.35373423],"study_design_scores_gemma":[0.000032228865,0.00003895678,0.00022682056,0.00007197884,0.000026165497,0.00012819139,0.000027014752,0.9180345,0.003670985,0.029902227,0.0478168,0.000024184339],"about_ca_topic_score_codex":0.0024252788,"about_ca_topic_score_gemma":0.00093399256,"teacher_disagreement_score":0.004745364,"about_ca_system_score_codex":0.00055455155,"about_ca_system_score_gemma":0.0008334015,"threshold_uncertainty_score":0.015874803},"labels":[],"label_agreement":null},{"id":"W2356633435","doi":"","title":"HVDC System Vulnerability Assessment Based on Models Combination and Risk Theory","year":2005,"lang":"en","type":"article","venue":"Dianli xitong zidonghua","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Correctness; Vulnerability (computing); Reliability engineering; Sensitivity (control systems); Vulnerability assessment; Computer science; Risk assessment; Index (typography); Risk analysis (engineering); Engineering; Computer security; Electronic engineering; Algorithm; Business","score_opus":0.009148954917874456,"score_gpt":0.23134205704626268,"score_spread":0.22219310212838822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2356633435","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044414576,0.0002218451,0.95063275,0.00011500856,0.0000120830555,0.0000620749,0.000041617204,0.0002712383,0.004228797],"genre_scores_gemma":[0.89104503,0.00048628086,0.10485689,0.000027855007,0.000027257925,0.00019530985,0.000095934905,0.00005261423,0.0032128699],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880743,0.00041177723,0.000047645863,0.00014037418,0.0005325745,0.00006015768],"domain_scores_gemma":[0.99936634,0.00031426168,0.00011920216,0.000062721745,0.000115460345,0.000022011607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000906206,0.001171062,0.0009438121,0.0013542166,0.0003691655,0.0010610351,0.000756683,0.00048240376,0.0011495474],"category_scores_gemma":[0.0019211536,0.00041827702,0.0011723884,0.0005167181,0.0005736792,0.0018677721,0.0010832286,0.00072632555,0.00017011116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007960579,0.00004169993,0.002665931,0.00007919258,0.00019317595,0.00022790556,0.00013850645,0.9135044,0.004936031,0.027798053,0.00042862128,0.049906854],"study_design_scores_gemma":[0.0000072271346,0.000051129264,0.0004585449,0.00000952907,0.000030085936,0.00011324348,0.00002866358,0.9853452,0.001231414,0.012058431,0.0006502799,0.000016301796],"about_ca_topic_score_codex":0.0021368626,"about_ca_topic_score_gemma":0.0012401751,"teacher_disagreement_score":0.0021368626,"about_ca_system_score_codex":0.0007514904,"about_ca_system_score_gemma":0.0006579787,"threshold_uncertainty_score":0.0054525137},"labels":[],"label_agreement":null},{"id":"W2371209324","doi":"","title":"Assessment and Hedging of Contract Unfulfilling Risks Facing Generation Companies","year":2011,"lang":"en","type":"article","venue":"Dianli xitong zidonghua","topic":"Smart Grid and Power Systems","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic shortage; Business; Electricity market; Risk management; Electricity; Finance; Actuarial science; Environmental economics; Economics; Engineering","score_opus":0.0816225932610637,"score_gpt":0.2724613986529326,"score_spread":0.19083880539186893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2371209324","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9288345,0.00030184284,0.06622021,0.00023658114,0.000013186279,0.000059543097,0.00008927998,0.000044023316,0.0042008283],"genre_scores_gemma":[0.99672073,0.00008074537,0.002693165,0.000005812652,0.000003040433,0.0000068388417,0.000029209697,0.0000024560406,0.0004579607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990293,0.00045528947,0.000043454962,0.00006570113,0.0003079534,0.00009835321],"domain_scores_gemma":[0.99780387,0.00123305,0.00042059654,0.000114002316,0.0003237657,0.00010466011],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029147908,0.0006768474,0.0004189135,0.0006913231,0.00023970653,0.0013801313,0.00053507014,0.00068096723,0.000716514],"category_scores_gemma":[0.0049847662,0.00028437015,0.0005113442,0.0005009574,0.000546139,0.0015401227,0.0007125196,0.00066223746,0.00004705028],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003737174,0.00008664278,0.019497244,0.000047500238,0.00010447188,0.0004771845,0.0001741599,0.93793875,0.005002218,0.010873556,0.00036956498,0.025055015],"study_design_scores_gemma":[0.000015611928,0.00017321724,0.009629744,0.000009926091,0.000044111057,0.000107936394,0.00020592588,0.9814077,0.003281357,0.0047946167,0.00029427026,0.00003558116],"about_ca_topic_score_codex":0.004084245,"about_ca_topic_score_gemma":0.0035931673,"teacher_disagreement_score":0.004084245,"about_ca_system_score_codex":0.0013057585,"about_ca_system_score_gemma":0.0006291527,"threshold_uncertainty_score":0.015415072},"labels":[],"label_agreement":null},{"id":"W2994290592","doi":"","title":"Testbed and Information Integration of EMS for a Microgrid with Multi-energy Generation Systems","year":2010,"lang":"en","type":"article","venue":"Dianli xitong zidonghua","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Microgrid; Testbed; Systems engineering; Energy management system; Photovoltaic system; Renewable energy; Wind power; Key (lock); Energy management; Energy storage; Electricity generation; System integration; Software; Electric power system; Computer science; Engineering; Automotive engineering; Embedded system; Reliability engineering; Energy (signal processing); Power (physics); Operating system; Electrical engineering; Aerospace engineering","score_opus":0.005393667365140855,"score_gpt":0.17203394855553325,"score_spread":0.1666402811903924,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2994290592","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41570294,0.00022191931,0.55952954,0.00029683005,0.00010842304,0.00063718716,0.000815122,0.0073349965,0.0153530575],"genre_scores_gemma":[0.87805635,0.000120818666,0.11868634,0.000020333275,0.0000092188975,0.00033043232,0.00077238696,0.00007078105,0.0019332931],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995827,0.00018259363,0.00003112182,0.000055654356,0.000103665225,0.000044233955],"domain_scores_gemma":[0.9996865,0.000081890736,0.000029270777,0.000100436875,0.000053862368,0.00004808336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068836624,0.00039469244,0.0003933192,0.0003082828,0.0002838544,0.00047831642,0.0006695537,0.00031010897,0.0016509113],"category_scores_gemma":[0.0008186759,0.00014118163,0.00027860518,0.0002723737,0.00037202364,0.00075207744,0.000615576,0.00040289905,0.00025041823],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010371491,0.0008440716,0.0074040107,0.0005435325,0.00011286059,0.0012980453,0.0005298381,0.6958129,0.10708404,0.06660741,0.0046729697,0.11405323],"study_design_scores_gemma":[0.00017961104,0.0009650036,0.0033851727,0.0000308533,0.000041959243,0.00017790408,0.00014007332,0.919435,0.054374374,0.0056434423,0.015595312,0.000031298307],"about_ca_topic_score_codex":0.0015965088,"about_ca_topic_score_gemma":0.001097633,"teacher_disagreement_score":0.0016509113,"about_ca_system_score_codex":0.00046867863,"about_ca_system_score_gemma":0.0006275731,"threshold_uncertainty_score":0.0055227876},"labels":[],"label_agreement":null}]}