{"meta":{"query_hash":"a152ebb61d5e","filters":{"venue":"Dianli zidonghua shebei"},"cohort_total":7,"direct_labels_cover":0,"predictions_cover":7,"exported":7,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/a152ebb61d5e","api":"https://metacan.xera.ac/api/v1/cohort?venue=Dianli+zidonghua+shebei"},"results":[{"id":"W2352619194","doi":"","title":"Orderly charging control based on peak-valley electricity tariffs for household electric vehicles of residential quarter","year":2015,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Electricity; Mains electricity; Consumption (sociology); Electric vehicle; Monte Carlo method; Control (management); Automotive engineering; Environmental science; Power (physics); Engineering; Economics; Electrical engineering; Voltage; Geography; Mathematics","score_opus":0.010326108977701436,"score_gpt":0.20240215929715533,"score_spread":0.19207605031945388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2352619194","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9357801,0.0015531678,0.05676108,0.0006359793,0.0006739203,0.0013731226,0.00014919267,0.00074979285,0.0023236477],"genre_scores_gemma":[0.9981928,0.000026134225,0.00059459475,0.0004880712,0.00042358492,0.000074321484,0.000039849114,0.000113301954,0.000047381895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977718,0.00006864415,0.00052358606,0.00038564415,0.0004662877,0.0007840402],"domain_scores_gemma":[0.998794,0.00020706037,0.00012917927,0.0004318347,0.0001906386,0.00024726134],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037683814,0.00038668656,0.0005376374,0.0004370239,0.00010156626,0.000076021606,0.00037306087,0.00027145952,0.000021447182],"category_scores_gemma":[0.00013620766,0.00037608383,0.0002282623,0.0007169484,0.000031903488,0.00019734967,0.00001104329,0.00043316084,0.000013170907],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026319888,0.000723073,0.019295042,0.0009253582,0.00091721624,0.00007574804,0.001332521,0.39048186,0.25260526,0.0027019477,0.27406216,0.05424781],"study_design_scores_gemma":[0.0088715,0.002044833,0.021606363,0.00010022531,0.00020811753,0.000012784085,0.000055516917,0.89273727,0.06435679,0.0015689469,0.007321182,0.0011164787],"about_ca_topic_score_codex":0.000118019925,"about_ca_topic_score_gemma":0.000037735106,"teacher_disagreement_score":0.5022554,"about_ca_system_score_codex":0.00018817378,"about_ca_system_score_gemma":0.00015835332,"threshold_uncertainty_score":0.9998691},"labels":[],"label_agreement":null},{"id":"W2353591114","doi":"","title":"Optimal dynamic control based on capacitor charge balance for Boost converter","year":2011,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Control theory (sociology); Duty cycle; Overshoot (microwave communication); Capacitor; MATLAB; Voltage; Charge control; Nonlinear system; Dynamic balance; Computer science; Engineering; Control (management); Electrical engineering; Physics; Power (physics)","score_opus":0.011843486623722982,"score_gpt":0.208078717321095,"score_spread":0.19623523069737203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2353591114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23782544,0.002718513,0.35925233,0.0021665504,0.03785133,0.005459418,0.0030032203,0.0023899572,0.34933323],"genre_scores_gemma":[0.98920304,0.00001135792,0.00072844326,0.0014676065,0.0005175429,0.00038922313,0.00011164879,0.00010982292,0.007461329],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99778503,0.00009151217,0.00044733883,0.00060157187,0.0002761971,0.00079835806],"domain_scores_gemma":[0.99859214,0.00014525185,0.00017189296,0.0006953928,0.000112209724,0.00028312427],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00023349289,0.0004165979,0.00055025105,0.00016626518,0.00017480334,0.00004950957,0.0004082611,0.00028526023,0.0009284208],"category_scores_gemma":[0.000048932885,0.00035189118,0.00030886897,0.000141685,0.00010625901,0.0001545897,0.000020918073,0.00015938107,0.0004004378],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.019363094,0.010512528,0.033970863,0.0030334906,0.0055450783,0.001351771,0.012053616,0.0509445,0.10027818,0.28352857,0.32208422,0.15733409],"study_design_scores_gemma":[0.010757748,0.0009889834,0.0031573246,0.00025072155,0.00012687824,0.000020030604,0.0001347844,0.6720393,0.008653851,0.00022440238,0.3021774,0.0014685934],"about_ca_topic_score_codex":0.0023849732,"about_ca_topic_score_gemma":0.00054705405,"teacher_disagreement_score":0.7513776,"about_ca_system_score_codex":0.00012158938,"about_ca_system_score_gemma":0.000092783324,"threshold_uncertainty_score":0.99998486},"labels":[],"label_agreement":null},{"id":"W2358927977","doi":"","title":"Problems on protection relay & urgency control system in interconnected power network of China and studies needed","year":2004,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power system; Relay; Electronic stability control; Maximum power transfer theorem; China; Interconnection; Reliability engineering; Engineering; Power (physics); Computer science; Computer security; Telecommunications; Automotive engineering","score_opus":0.009611889068478114,"score_gpt":0.19419091988408974,"score_spread":0.1845790308156116,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2358927977","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9867059,0.0067063165,0.0024368365,0.00014341297,0.0010095563,0.0010690194,0.000008194024,0.0007241163,0.001196663],"genre_scores_gemma":[0.999467,0.00012813718,0.00009211988,0.0000088403895,0.000043495358,0.0002130803,0.0000013753132,0.000032204043,0.000013735221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9988806,0.00003134869,0.00043888757,0.00022231953,0.00011872907,0.00030809728],"domain_scores_gemma":[0.9995586,0.000033348675,0.00008303664,0.00024137099,0.00004302342,0.000040601477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020260969,0.00022331937,0.00045657126,0.00017251118,0.000044785884,0.00001725733,0.00011424938,0.00017089712,0.0000023374132],"category_scores_gemma":[0.00009319615,0.00019017987,0.00005461528,0.00038302032,0.000057324494,0.00011684191,0.000031315412,0.00024853414,0.000007643854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000495656,0.0006018262,0.026031222,0.008751671,0.0026400494,0.0002658132,0.028696338,0.77672416,0.029821966,0.10176185,0.0023111056,0.02189837],"study_design_scores_gemma":[0.06832667,0.0135930125,0.5221476,0.07932448,0.0008149155,0.00072358124,0.090643995,0.102270335,0.06664744,0.02922732,0.014598636,0.011682004],"about_ca_topic_score_codex":0.0003229329,"about_ca_topic_score_gemma":0.00025166388,"teacher_disagreement_score":0.6744538,"about_ca_system_score_codex":0.00019319779,"about_ca_system_score_gemma":0.00001139449,"threshold_uncertainty_score":0.775531},"labels":[],"label_agreement":null},{"id":"W2373726571","doi":"","title":"Risk assessment for preventive control of static voltage stability","year":2014,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"Smart Grid and Power Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Preventive maintenance; Control theory (sociology); Correctness; Stability (learning theory); Preventive action; Reliability engineering; Contingency; Electric power system; Control (management); Voltage; Engineering; Electronic stability control; Computer science; Power (physics); Automotive engineering; Algorithm","score_opus":0.006072743596171941,"score_gpt":0.22614302846555046,"score_spread":0.22007028486937852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2373726571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27703434,0.00021058657,0.7142624,0.00002817629,0.003352382,0.0010102376,0.0005880733,0.00016385129,0.0033499345],"genre_scores_gemma":[0.99821734,0.00001421586,0.00095595745,0.000027064454,0.00046712105,0.00017763923,0.00003258383,0.000039184342,0.00006890372],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876493,0.0001094199,0.0004260159,0.00021225207,0.00018231949,0.00030504834],"domain_scores_gemma":[0.9986905,0.00059445476,0.00010879995,0.0003968775,0.0001043889,0.000105015795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007655754,0.00018817889,0.0004059524,0.00006072416,0.00004965004,0.000025591664,0.00016521585,0.00007822986,0.00007258363],"category_scores_gemma":[0.00016171166,0.00017656178,0.00016515078,0.000098115685,0.00004420117,0.000117845106,0.000014338599,0.00012936495,0.000017081375],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026100178,0.00086579815,0.80482805,0.0055670124,0.0022120937,0.0000048863108,0.006723032,0.02488417,0.025647873,0.010320295,0.070862584,0.047823217],"study_design_scores_gemma":[0.00837197,0.0009656484,0.2738088,0.00028824093,0.00048652253,0.0000026317541,0.0007127102,0.50846714,0.015812393,0.0029710808,0.18681292,0.0012999316],"about_ca_topic_score_codex":0.000066545515,"about_ca_topic_score_gemma":0.00006648162,"teacher_disagreement_score":0.721183,"about_ca_system_score_codex":0.000067315494,"about_ca_system_score_gemma":0.000027265543,"threshold_uncertainty_score":0.71999806},"labels":[],"label_agreement":null},{"id":"W2383788718","doi":"","title":"The Graphic-Interface-Based Breaker Status Simulation System of 110 kV Network Protection","year":2001,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"Power Systems and Technologies","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Circuit breaker; Backup; Relay; Interface (matter); Correctness; Graphical user interface; Fault (geology); Graphics; Computer science; Engineering; Reliability engineering; Simulation; Electrical engineering; Operating system","score_opus":0.009982789978080567,"score_gpt":0.20550381175728596,"score_spread":0.19552102177920538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2383788718","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63756675,0.0051229564,0.3425868,0.0001739729,0.003314981,0.0015752998,0.000029896564,0.0029961555,0.006633203],"genre_scores_gemma":[0.9994561,0.00007424471,0.00013606227,0.000004886567,0.00012224847,0.00009668298,0.0000050137132,0.000039691655,0.00006508055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987563,0.000043746215,0.0003812268,0.00017719592,0.00020151366,0.00044002983],"domain_scores_gemma":[0.9992005,0.00010411642,0.00010181988,0.00046107752,0.0000782032,0.000054241493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023279201,0.00019253547,0.00022670996,0.000109684384,0.00014955968,0.000058124595,0.0001882982,0.0001721635,0.0000066431367],"category_scores_gemma":[0.000036910555,0.00014708043,0.000102430124,0.0005202152,0.0000665706,0.00011246973,0.000024803132,0.00019780871,0.00002432015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005554142,0.000021553986,0.006812916,0.000238749,0.0001106937,0.000007999869,0.0001034212,0.96643955,0.0010353854,0.001467415,0.0007675638,0.02293919],"study_design_scores_gemma":[0.00072102185,0.00012979351,0.014923254,0.00042702068,0.000038964954,0.000010890625,0.00046249872,0.9143726,0.0034018976,0.00025230032,0.06486076,0.0003989534],"about_ca_topic_score_codex":0.00017602518,"about_ca_topic_score_gemma":0.00020704122,"teacher_disagreement_score":0.36188933,"about_ca_system_score_codex":0.000111647205,"about_ca_system_score_gemma":0.000017249038,"threshold_uncertainty_score":0.59977657},"labels":[],"label_agreement":null},{"id":"W2385852617","doi":"","title":"Discussion on Compensation Mode for Power Distribution Network","year":2001,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"Advanced Sensor and Control Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Arc suppression; Compensation (psychology); Ground; Mode (computer interface); Electromagnetic coil; Power (physics); Point (geometry); Arc (geometry); Control theory (sociology); Electrical engineering; Computer science; Electric power system; Electronic engineering; Engineering; Mathematics; Physics; Psychology; Mechanical engineering; Control (management); Artificial intelligence","score_opus":0.008302169873546324,"score_gpt":0.23110404240179946,"score_spread":0.22280187252825315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2385852617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14276147,0.0003922753,0.84210503,0.00063189596,0.0026516642,0.001158787,0.00023973107,0.000858629,0.009200496],"genre_scores_gemma":[0.99822444,0.000031601285,0.00018097002,0.00008157679,0.0005130288,0.000072142124,0.0004338819,0.000042147,0.00042020294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990234,0.00002140144,0.00023248538,0.00019879031,0.00015045288,0.0003734881],"domain_scores_gemma":[0.9995206,0.00006622227,0.00003643332,0.00024467235,0.000038225582,0.000093861476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000080515754,0.00018227886,0.0002068642,0.000028738805,0.00012926095,0.00003554983,0.00009227865,0.0001002335,0.000026451145],"category_scores_gemma":[0.000024092518,0.0001371,0.000103514736,0.00013798341,0.000015098453,0.00013868972,0.000008161493,0.000106224456,0.00007214438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002425894,0.00007003218,0.0022418625,0.00004475657,0.000066760214,0.000009524219,0.0002319361,0.9241375,0.0030939563,0.01129713,0.023311766,0.035252232],"study_design_scores_gemma":[0.0022797212,0.00023548497,0.015722616,0.00017201802,0.000043052565,0.0000114807335,0.00015486349,0.608944,0.0005874315,0.005394987,0.3656727,0.0007816596],"about_ca_topic_score_codex":0.000008527905,"about_ca_topic_score_gemma":0.00003007495,"teacher_disagreement_score":0.85546297,"about_ca_system_score_codex":0.00012024235,"about_ca_system_score_gemma":0.0000048818065,"threshold_uncertainty_score":0.55907756},"labels":[],"label_agreement":null},{"id":"W2978496256","doi":"","title":"Harmonic analysis method for converter","year":2009,"lang":"en","type":"article","venue":"Dianli zidonghua shebei","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Harmonics; Admittance parameters; Harmonic; Admittance; Frequency domain; Harmonic analysis; Control theory (sociology); Nonlinear system; Voltage; Physics; Mathematics; Electronic engineering; Computer science; Engineering; Mathematical analysis; Electrical engineering; Acoustics; Electrical impedance","score_opus":0.012865320824821462,"score_gpt":0.2683587446940179,"score_spread":0.25549342386919643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978496256","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0065539223,0.0009702271,0.9874128,0.000345791,0.0005409852,0.0004398482,0.000068898735,0.0006299244,0.0030376164],"genre_scores_gemma":[0.97536564,0.00003880564,0.022701282,0.00031783074,0.00018585073,0.000075687705,0.0000722449,0.000058403708,0.0011842668],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841493,0.00004885003,0.0004388529,0.0003631135,0.00023448671,0.000499783],"domain_scores_gemma":[0.99898344,0.00014302511,0.000040288374,0.0005136831,0.00006912495,0.0002504269],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032950597,0.00028693266,0.00054485624,0.00037643802,0.00007346388,0.00008092688,0.00030281645,0.00017169092,0.0003171992],"category_scores_gemma":[0.000018325283,0.00027151336,0.00045099208,0.0007964185,0.000016175161,0.00016874359,0.000007876216,0.00016221985,0.00019495968],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000199726,0.00046727882,0.0057282513,0.00086314196,0.009375181,0.00015724535,0.008720443,0.04040813,0.20882457,0.005294207,0.18954118,0.53042066],"study_design_scores_gemma":[0.0018750611,0.00012719711,0.011436577,0.000059016245,0.0013025833,0.000014144505,0.00013126519,0.6945151,0.02312959,0.00047073368,0.2658122,0.001126533],"about_ca_topic_score_codex":0.000028955626,"about_ca_topic_score_gemma":0.000017961049,"teacher_disagreement_score":0.9688117,"about_ca_system_score_codex":0.000070264636,"about_ca_system_score_gemma":0.000020820411,"threshold_uncertainty_score":0.9999737},"labels":[],"label_agreement":null}]}