{"meta":{"query_hash":"f171ec29567c","filters":{"venue":"Distribution and Utilization"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/f171ec29567c","api":"https://metacan.xera.ac/api/v1/cohort?venue=Distribution+and+Utilization"},"results":[{"id":"W2389760862","doi":"","title":"Networked Feeders Distribution Automation System Based on Distributed Protection","year":2010,"lang":"en","type":"article","venue":"Distribution and Utilization","topic":"Power Systems and Technologies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Modular design; Scheme (mathematics); Automation; Engineering; Distributed computing; Systems engineering; Computer science; Operating system","score_opus":0.012582283104054402,"score_gpt":0.205569931571926,"score_spread":0.1929876484678716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2389760862","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08739391,0.0004971347,0.7597158,0.0004092775,0.0004093591,0.00047446557,0.0005837552,0.025501233,0.12501504],"genre_scores_gemma":[0.7936552,0.00037888484,0.16293433,0.00015916233,0.00025117048,0.00028088587,0.00091362774,0.00017847551,0.04124828],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99948704,0.000075495176,0.000030407136,0.00014175447,0.00021877652,0.000046547568],"domain_scores_gemma":[0.9996649,0.00004388856,0.000034815857,0.00009226177,0.00012754144,0.000036642647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027419237,0.00043497497,0.00034807425,0.0006392828,0.0006895816,0.00094075076,0.00074215874,0.00027523973,0.008854534],"category_scores_gemma":[0.00039325794,0.00014327736,0.00019503542,0.0006871177,0.00042133126,0.0009290928,0.0008070436,0.00036035516,0.002557448],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059218635,0.00037587166,0.005156858,0.00031857862,0.000084613755,0.0008339467,0.00054324564,0.09173524,0.054801162,0.060371503,0.043100815,0.74208605],"study_design_scores_gemma":[0.00045997958,0.0011925376,0.006794428,0.000121719146,0.00022182828,0.0013566294,0.00015110058,0.5999927,0.050552182,0.035950314,0.3030726,0.00013394815],"about_ca_topic_score_codex":0.0033437791,"about_ca_topic_score_gemma":0.005203172,"teacher_disagreement_score":0.008854534,"about_ca_system_score_codex":0.0008363074,"about_ca_system_score_gemma":0.00084924855,"threshold_uncertainty_score":0.029621363},"labels":[],"label_agreement":null},{"id":"W2393124845","doi":"","title":"Application of the Single-phase Compact Substation in Power Supply for the Residential Quarter","year":2009,"lang":"en","type":"article","venue":"Distribution and Utilization","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transformer; Engineering; Single phase; Electrical engineering; Quarter (Canadian coin); Single-phase electric power; Power (physics); Three-phase; Electronic engineering; Voltage; Power factor; Geography","score_opus":0.017303697174811554,"score_gpt":0.2733707942863456,"score_spread":0.256067097111534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2393124845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6526915,0.00097240525,0.3166341,0.00042320363,0.000101168065,0.00005899235,0.00015729615,0.00095600844,0.02800542],"genre_scores_gemma":[0.989421,0.00016860093,0.009133202,0.000016042655,0.000014904551,0.0000048133015,0.000029442897,0.000011710347,0.0012002946],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99990237,0.000032408243,0.0000064270885,0.00001747207,0.000030268886,0.000011053325],"domain_scores_gemma":[0.99986863,0.000028726623,0.00002001389,0.000034595945,0.000036750636,0.000011313404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008872875,0.00015313586,0.00016455863,0.00021818776,0.00023048959,0.00029160487,0.00026657342,0.0001758827,0.0032289587],"category_scores_gemma":[0.0002365315,0.00007817922,0.0001427017,0.00038608533,0.00018932075,0.00048361043,0.0002772514,0.00010860944,0.0004200403],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008990079,0.00011892996,0.013018255,0.00063346885,0.000042466407,0.00142341,0.00069333304,0.02141778,0.34822425,0.019049983,0.0039498033,0.59052926],"study_design_scores_gemma":[0.0002948285,0.003839845,0.043553665,0.00011478121,0.0002190459,0.016722681,0.0015373954,0.20010476,0.5882221,0.02096839,0.12434963,0.00007280952],"about_ca_topic_score_codex":0.00037130492,"about_ca_topic_score_gemma":0.0006934891,"teacher_disagreement_score":0.0032289587,"about_ca_system_score_codex":0.00022598101,"about_ca_system_score_gemma":0.00015783097,"threshold_uncertainty_score":0.010801971},"labels":[],"label_agreement":null}]}