{"meta":{"query_hash":"ea63963cc186","filters":{"venue":"Electric Power Technologic Economics"},"cohort_total":5,"direct_labels_cover":0,"predictions_cover":5,"exported":5,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/ea63963cc186","api":"https://metacan.xera.ac/api/v1/cohort?venue=Electric+Power+Technologic+Economics"},"results":[{"id":"W2368209780","doi":"","title":"Comparative Analysis on Measures Taken by China and Other Countries to Cope with Power Grid Blackouts Caused by Ice Storms","year":2008,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Icing and De-icing Technologies","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Snow; Extreme weather; China; Storm; Natural disaster; Electric power transmission; Meteorology; Emergency management; Winter storm; Damages; Environmental science; Icing; Freezing rain; Climatology; Engineering; Geography; Climate change; Political science; Geology; Economic growth; Economics","score_opus":0.008264491710167177,"score_gpt":0.19301152251545195,"score_spread":0.18474703080528476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368209780","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99185383,0.0004914306,0.00012430384,0.00020794795,0.00001457236,0.000023657563,0.00013506947,0.00000921959,0.007139974],"genre_scores_gemma":[0.99904615,0.00022680755,0.00007629957,0.00004800813,0.0000042236616,0.0000050602175,0.00011267895,0.0000013867297,0.00047933194],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993344,0.00015661247,0.000047888985,0.000048072106,0.00018814424,0.00022492697],"domain_scores_gemma":[0.99828404,0.00026049803,0.00051935227,0.00007674031,0.0006007993,0.00025851047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086529186,0.00021522975,0.00018938848,0.0012902484,0.0005194846,0.00073993177,0.0003402918,0.00028881978,0.0008428503],"category_scores_gemma":[0.0021052284,0.00006261542,0.00028332556,0.001622702,0.0003757657,0.00045244006,0.00035664203,0.00017358518,0.00005379704],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012468499,0.00026850303,0.8503331,0.0005163384,0.00043066338,0.0022091218,0.0036435167,0.014346995,0.0054718386,0.0054779397,0.0037256614,0.11232946],"study_design_scores_gemma":[0.00003150868,0.0003138418,0.98952043,0.000033782773,0.00006526099,0.000116655814,0.0033223021,0.0013445468,0.0011058173,0.00013018266,0.0040005865,0.000014955287],"about_ca_topic_score_codex":0.052302368,"about_ca_topic_score_gemma":0.0766955,"teacher_disagreement_score":0.052302368,"about_ca_system_score_codex":0.0020143776,"about_ca_system_score_gemma":0.0013896192,"threshold_uncertainty_score":0.10399586},"labels":[],"label_agreement":null},{"id":"W2369238000","doi":"","title":"Benefit from Electric Power Management in Canada","year":2005,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Power Systems and Technologies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power industry; Electric power; Business; Profit (economics); Government (linguistics); Private sector; Service (business); Power (physics); Finance; Marketing; Industrial organization; Electricity; Economics; Economic growth; Engineering; Electrical engineering","score_opus":0.003534885308339558,"score_gpt":0.1494424150635561,"score_spread":0.14590752975521654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2369238000","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022708751,0.015824473,0.0005668223,0.041235846,0.001156506,0.000052906027,0.0010579552,0.000092308124,0.91730446],"genre_scores_gemma":[0.21785218,0.019822171,0.0012686785,0.008433753,0.0002618493,0.000024729727,0.00073549163,0.00006623517,0.75153494],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99892575,0.00003532605,0.000018600686,0.000045818575,0.00059788476,0.00037656442],"domain_scores_gemma":[0.9989592,0.000039140094,0.00002325188,0.000017289582,0.0006025896,0.0003586337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004464458,0.00022094758,0.00017042254,0.0010718146,0.0063416734,0.0038461923,0.00049979816,0.00074499636,0.019558111],"category_scores_gemma":[0.0010416533,0.00015491396,0.0001586282,0.0027535055,0.0012302849,0.00087193376,0.0013575125,0.001143436,0.001380615],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045799727,0.00006129241,0.010041387,0.0001953092,0.0000102915365,0.00059615367,0.0018080471,0.0006555589,0.0006388979,0.22868755,0.5660887,0.19117102],"study_design_scores_gemma":[0.0000032783466,0.0000048050947,0.013636455,0.00008127473,0.000003430384,0.0000843394,0.00096431817,0.00021291553,0.00008696933,0.002101329,0.9828095,0.000011302192],"about_ca_topic_score_codex":0.98642296,"about_ca_topic_score_gemma":0.9963425,"teacher_disagreement_score":0.06016468,"about_ca_system_score_codex":0.06016468,"about_ca_system_score_gemma":0.12177628,"threshold_uncertainty_score":0.4365273},"labels":[],"label_agreement":null},{"id":"W2372613777","doi":"","title":"Analysis on Electricity Consumption by the Metallurgical Industry in the First Quarter of 2007 and the Trend for the Second Quarter","year":2007,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Geoscience and Mining Technology","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Consumption (sociology); Electricity; Ferrous metallurgy; Metallurgy; Product (mathematics); Business; Natural resource economics; Engineering; Economics; Materials science","score_opus":0.008255780432965851,"score_gpt":0.21079730408720296,"score_spread":0.2025415236542371,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2372613777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9827565,0.00040411475,0.00021568031,0.0002908644,0.00002222895,0.0000106244415,0.01217481,0.000033294302,0.004091873],"genre_scores_gemma":[0.9705129,0.00057316304,0.0002256981,0.00007488106,0.000028360886,0.000016807917,0.023157718,0.000014309357,0.0053961645],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99986374,0.0000106472435,0.000012254223,0.00002537839,0.00004651376,0.00004149933],"domain_scores_gemma":[0.99952936,0.000050824387,0.00013497048,0.000015077255,0.00021031697,0.000059414062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011870679,0.00015039579,0.00021725195,0.0013852147,0.0001488937,0.0005176905,0.00019346461,0.0002797665,0.0024880357],"category_scores_gemma":[0.00037709577,0.00009584634,0.00045032223,0.002389435,0.000084144354,0.000360876,0.00018226127,0.0003937597,0.0008125238],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002539289,0.00008325052,0.9693179,0.00007191071,0.0001083463,0.00031477137,0.00022059749,0.0028637804,0.0013228235,0.0006485731,0.009684012,0.015110093],"study_design_scores_gemma":[0.0000024486942,0.00003108677,0.9938636,0.0000074471113,0.000013130405,0.00015759739,0.00039548165,0.0015646995,0.0003125951,0.000041165134,0.0036057658,0.000005036008],"about_ca_topic_score_codex":0.030549848,"about_ca_topic_score_gemma":0.038278267,"teacher_disagreement_score":0.030549848,"about_ca_system_score_codex":0.0007451061,"about_ca_system_score_gemma":0.00031239475,"threshold_uncertainty_score":0.060744047},"labels":[],"label_agreement":null},{"id":"W2380861589","doi":"","title":"Analysis on Power Demand in the First Quarter of 2009 in China","year":2009,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); China; Power demand; Power (physics); Economics; Natural resource economics; Geography; Power consumption","score_opus":0.003853809207254732,"score_gpt":0.18798934214388807,"score_spread":0.18413553293663334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2380861589","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9949405,0.00013312491,0.00017277067,0.00016700564,0.000009438408,0.000007114964,0.0025376857,0.000013113782,0.0020191378],"genre_scores_gemma":[0.99507165,0.00016271918,0.000067945075,0.000026050988,0.000010795832,0.000006658252,0.0035546327,0.0000041182816,0.0010954272],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997396,0.000018942981,0.00002176794,0.00003571166,0.00008441643,0.000099512785],"domain_scores_gemma":[0.9994191,0.0000829466,0.00011215656,0.000024879402,0.0002728217,0.00008816746],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029043428,0.00029768673,0.0004602936,0.0015732934,0.0005524508,0.0006683405,0.0003767395,0.00039168185,0.0014101772],"category_scores_gemma":[0.00074404385,0.00025399434,0.00050708576,0.0024964202,0.00018324249,0.000515069,0.00033958966,0.00032743005,0.00025967023],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004488432,0.00012129874,0.94439644,0.00014708338,0.0001270601,0.0013392165,0.0010195122,0.025941635,0.0033056212,0.0011234106,0.005968643,0.016061129],"study_design_scores_gemma":[0.0000039679626,0.000055099455,0.981697,0.000010151844,0.000018355096,0.00013813812,0.0010499757,0.014462806,0.0005246385,0.00010323201,0.0019170723,0.000019594878],"about_ca_topic_score_codex":0.15497677,"about_ca_topic_score_gemma":0.15496022,"teacher_disagreement_score":0.15497677,"about_ca_system_score_codex":0.0025488941,"about_ca_system_score_gemma":0.00084733963,"threshold_uncertainty_score":0.30814946},"labels":[],"label_agreement":null},{"id":"W2384569739","doi":"","title":"Evolvement of Ontario's Electricity Plan and its Role and Characteristics","year":2008,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Plan (archaeology); Function (biology); Electric power industry; Rationality; Electricity market; Process (computing); Business; Power (physics); Economics; Operations management; Engineering; Political science; Computer science; Law; Electrical engineering","score_opus":0.01325449539722822,"score_gpt":0.20320624586411035,"score_spread":0.18995175046688212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2384569739","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46401903,0.0010740384,0.005260132,0.017701302,0.000100708,0.00027891027,0.0008152643,0.0000726878,0.51067793],"genre_scores_gemma":[0.97054625,0.0004450091,0.0012918272,0.00021966055,0.000011025761,0.000024102168,0.00015409471,0.00001543289,0.027292602],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9977925,0.00022900238,0.000050222316,0.0001640042,0.0011733053,0.0005909771],"domain_scores_gemma":[0.9972613,0.00024495414,0.00029244064,0.00017133103,0.0012145883,0.0008153874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016311504,0.00011082529,0.00014864106,0.001314001,0.006032993,0.0044028754,0.0006995988,0.00057337095,0.0024863936],"category_scores_gemma":[0.0042213546,0.00024087909,0.00014863623,0.0023703454,0.0059562167,0.0012482896,0.0014605653,0.0007925029,0.00010713972],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.00008809226,0.000039286722,0.07346782,0.0001238329,0.000024020255,0.00079112785,0.03369672,0.005721729,0.0015130616,0.78993195,0.019290233,0.075312145],"study_design_scores_gemma":[0.000021673377,0.00007149007,0.2855033,0.00013719253,0.000021135525,0.0002490738,0.023112867,0.0049781166,0.0007531628,0.02040277,0.6646611,0.00008811166],"about_ca_topic_score_codex":0.973154,"about_ca_topic_score_gemma":0.98842376,"teacher_disagreement_score":0.8553915,"about_ca_system_score_codex":0.1446085,"about_ca_system_score_gemma":0.113915846,"threshold_uncertainty_score":0.9921329},"labels":[],"label_agreement":null}]}