{"meta":{"query_hash":"ea63963cc186","filters":{"venue":"Electric Power Technologic Economics"},"cohort_total":5,"direct_labels_cover":0,"predictions_cover":5,"exported":5,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/ea63963cc186","api":"https://metacan.xera.ac/api/v1/cohort?venue=Electric+Power+Technologic+Economics"},"results":[{"id":"W2368209780","doi":"","title":"Comparative Analysis on Measures Taken by China and Other Countries to Cope with Power Grid Blackouts Caused by Ice Storms","year":2008,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Icing and De-icing Technologies","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Snow; Extreme weather; China; Storm; Natural disaster; Electric power transmission; Meteorology; Emergency management; Winter storm; Damages; Environmental science; Icing; Freezing rain; Climatology; Engineering; Geography; Climate change; Political science; Geology; Economic growth; Economics","score_opus":0.008264491710167177,"score_gpt":0.19301152251545195,"score_spread":0.18474703080528476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2368209780","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9890444,0.0007467925,0.0036397222,0.0003809482,0.000068552166,0.00031268696,0.00009077508,0.0020586778,0.0036574078],"genre_scores_gemma":[0.9986117,0.00043502692,0.0003318998,0.00032370997,0.000008601589,0.000041583306,0.000009965329,0.000038399867,0.0001991187],"study_design_codex":"not_applicable","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998553,0.000014891827,0.00029954524,0.0004796711,0.00012239905,0.0005305258],"domain_scores_gemma":[0.99917734,0.00007343527,0.00010277863,0.0005339555,0.000037933798,0.00007458171],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015085826,0.00040557684,0.00068790885,0.00063376536,0.00019013755,0.000056940036,0.00038819356,0.00032208144,0.000019154213],"category_scores_gemma":[0.00004332975,0.00032940795,0.000057750203,0.0009841836,0.00019180354,0.00010067192,0.00004642859,0.00045153545,0.00005176412],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00093606,0.00082365645,0.108154304,0.000077446166,0.010794494,0.000117100986,0.008907174,0.105846405,0.012900283,0.0095992945,0.73400736,0.0078364145],"study_design_scores_gemma":[0.002948596,0.005294514,0.018378107,0.00008378053,0.0005977473,0.000117645184,0.0013765676,0.010144301,0.67987454,0.00092077884,0.2763652,0.0038982301],"about_ca_topic_score_codex":0.000064044434,"about_ca_topic_score_gemma":0.00007655447,"teacher_disagreement_score":0.66697425,"about_ca_system_score_codex":0.00027680508,"about_ca_system_score_gemma":0.000026300755,"threshold_uncertainty_score":0.9999158},"labels":[],"label_agreement":null},{"id":"W2369238000","doi":"","title":"Benefit from Electric Power Management in Canada","year":2005,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Power Systems and Technologies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electric power industry; Electric power; Business; Profit (economics); Government (linguistics); Private sector; Service (business); Power (physics); Finance; Marketing; Industrial organization; Electricity; Economics; Economic growth; Engineering; Electrical engineering","score_opus":0.003534885308339558,"score_gpt":0.1494424150635561,"score_spread":0.14590752975521654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2369238000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97053444,0.0053307875,0.00027778465,0.000385617,0.0004021592,0.00036914888,0.00001770288,0.0014334995,0.021248862],"genre_scores_gemma":[0.9966529,0.0018098952,0.0010764536,0.00014296468,0.000024149012,0.00010053734,0.0000062336803,0.00005253719,0.00013434836],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979113,0.0000064909304,0.0005907217,0.0004910088,0.0001037783,0.000896747],"domain_scores_gemma":[0.9990461,0.000045634908,0.000094813644,0.00073519617,0.000014702196,0.00006358536],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000110166955,0.00038167043,0.00045658535,0.0006682274,0.000050614904,0.00004146154,0.00085843384,0.00033161227,0.00010808429],"category_scores_gemma":[0.000017307333,0.0004052135,0.00006785493,0.000844713,0.000017453169,0.00016724964,0.00012028683,0.0005691882,0.000111859736],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053031392,0.00030825514,0.020937357,0.00006261856,0.0011588382,0.00042932734,0.0001579599,0.05176712,0.0046962793,0.08425975,0.029577732,0.80659175],"study_design_scores_gemma":[0.003445566,0.00039260663,0.045352414,0.00010774291,0.00008807106,0.000113010276,0.0010533313,0.11550701,0.089139774,0.04106166,0.6993611,0.004377751],"about_ca_topic_score_codex":0.053346872,"about_ca_topic_score_gemma":0.31073555,"teacher_disagreement_score":0.80221397,"about_ca_system_score_codex":0.0030396143,"about_ca_system_score_gemma":0.000108695735,"threshold_uncertainty_score":0.99983996},"labels":[],"label_agreement":null},{"id":"W2372613777","doi":"","title":"Analysis on Electricity Consumption by the Metallurgical Industry in the First Quarter of 2007 and the Trend for the Second Quarter","year":2007,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Geoscience and Mining Technology","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Consumption (sociology); Electricity; Ferrous metallurgy; Metallurgy; Product (mathematics); Business; Natural resource economics; Engineering; Economics; Materials science","score_opus":0.008255780432965851,"score_gpt":0.21079730408720296,"score_spread":0.2025415236542371,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2372613777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9907158,0.0012083277,0.0030798956,0.0035806824,0.0000673299,0.00046442664,0.000010791864,0.000099093275,0.00077362463],"genre_scores_gemma":[0.9990806,0.00023219213,0.000029235436,0.0005032288,0.00001228983,0.00008850619,0.0000023651507,0.000007775581,0.000043821045],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99889857,0.000025285137,0.00036303818,0.00023262542,0.00006524318,0.00041526047],"domain_scores_gemma":[0.9982117,0.0011356013,0.000119271084,0.00050722325,0.000011670911,0.000014570576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001668891,0.0001717577,0.00028385821,0.00033522394,0.00016876956,0.000036243466,0.0007360844,0.00052882737,0.00004282397],"category_scores_gemma":[0.000074034644,0.00007903677,0.00011763022,0.0009482814,0.0003674546,0.000049102382,0.000028639828,0.001019405,0.0000037118157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002302415,0.0019684287,0.14017843,0.00019669675,0.009363957,0.000036789403,0.012401368,0.018059915,0.0029372834,0.4248805,0.18143094,0.20624328],"study_design_scores_gemma":[0.010409527,0.0033595124,0.13953227,0.00003126552,0.0018131884,0.00033055636,0.011268332,0.48570243,0.022563221,0.036433082,0.28642723,0.002129368],"about_ca_topic_score_codex":0.000012985559,"about_ca_topic_score_gemma":0.0005045414,"teacher_disagreement_score":0.46764252,"about_ca_system_score_codex":0.00006136252,"about_ca_system_score_gemma":0.000009136222,"threshold_uncertainty_score":0.4428864},"labels":[],"label_agreement":null},{"id":"W2380861589","doi":"","title":"Analysis on Power Demand in the First Quarter of 2009 in China","year":2009,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); China; Power demand; Power (physics); Economics; Natural resource economics; Geography; Power consumption","score_opus":0.003853809207254732,"score_gpt":0.18798934214388807,"score_spread":0.18413553293663334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2380861589","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94728756,0.0008644485,0.00009005372,0.0016003822,0.00009849419,0.00016735519,0.0000031725167,0.000076715594,0.04981183],"genre_scores_gemma":[0.99903136,0.00024415588,0.00003424027,0.00049824803,0.000013791217,0.000020684545,0.0000044701774,0.000011017187,0.00014199867],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99825376,0.00005957348,0.00066032715,0.00042644553,0.00009620747,0.00050367176],"domain_scores_gemma":[0.99887305,0.00007662909,0.00024929215,0.00075778714,0.000014029883,0.000029197643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005524601,0.00025410176,0.00058738136,0.0014003711,0.000051706138,0.00002823736,0.00071462773,0.0003744311,0.0000772309],"category_scores_gemma":[0.000050272123,0.00017931359,0.00019533353,0.0022441586,0.000039266743,0.00008455101,0.00002415328,0.00034643672,0.000017532595],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042107783,0.0036553945,0.12581727,0.000025903775,0.0010342381,0.00023260158,0.0030983242,0.33220848,0.00095974683,0.5035861,0.0065206876,0.022440178],"study_design_scores_gemma":[0.0037738697,0.0042355116,0.8048661,0.00010417643,0.0002043701,0.00006615306,0.0010084221,0.016460225,0.006548471,0.06350336,0.09744777,0.0017816065],"about_ca_topic_score_codex":0.00089254056,"about_ca_topic_score_gemma":0.0038216726,"teacher_disagreement_score":0.6790488,"about_ca_system_score_codex":0.00017372212,"about_ca_system_score_gemma":0.000030957726,"threshold_uncertainty_score":0.7312196},"labels":[],"label_agreement":null},{"id":"W2384569739","doi":"","title":"Evolvement of Ontario's Electricity Plan and its Role and Characteristics","year":2008,"lang":"en","type":"article","venue":"Electric Power Technologic Economics","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electricity; Plan (archaeology); Function (biology); Electric power industry; Rationality; Electricity market; Process (computing); Business; Power (physics); Economics; Operations management; Engineering; Political science; Computer science; Law; Electrical engineering","score_opus":0.01325449539722822,"score_gpt":0.20320624586411035,"score_spread":0.18995175046688212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2384569739","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9935447,0.00086029276,0.0000052766914,0.00074427744,0.000030706204,0.00015653434,0.000028417802,0.000041380823,0.0045884373],"genre_scores_gemma":[0.9952397,0.0030910368,0.00006457179,0.00031122533,0.00001883919,0.0000070689366,0.0000011940098,0.0000052743812,0.0012611334],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999216,0.000013443451,0.00019106136,0.0002019701,0.000056035027,0.00032145804],"domain_scores_gemma":[0.9995694,0.000043346598,0.00016628731,0.00011269174,0.00002473273,0.00008352067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016204592,0.0000980765,0.00020181299,0.000121979756,0.00022955738,0.000013821064,0.00016639667,0.00016560506,0.00003835376],"category_scores_gemma":[0.00012837247,0.00010816341,0.000023272056,0.00017827233,0.0001379761,0.00009269774,0.000035337434,0.0001787374,0.0000033960432],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013017705,0.0003366072,0.32447422,0.000032716052,0.00018713239,0.000051486444,0.024437016,0.0000037607495,0.0029411223,0.6010953,0.0050468906,0.04126352],"study_design_scores_gemma":[0.0008139714,0.0007331001,0.3451314,0.000018382616,0.000033567983,0.0000741407,0.0003134811,0.00035644133,0.008106273,0.021249041,0.62242526,0.0007449545],"about_ca_topic_score_codex":0.054829016,"about_ca_topic_score_gemma":0.08167382,"teacher_disagreement_score":0.61737835,"about_ca_system_score_codex":0.00046121769,"about_ca_system_score_gemma":0.00050771906,"threshold_uncertainty_score":0.95146495},"labels":[],"label_agreement":null}]}