{"meta":{"query_hash":"10b479e8c3bf","filters":{"venue":"Energy Transition and Policy Challenges,36th IAEE International Conference,June 16-20, 2013"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/10b479e8c3bf","api":"https://metacan.xera.ac/api/v1/cohort?venue=Energy+Transition+and+Policy+Challenges%2C36th+IAEE+International+Conference%2CJune+16-20%2C+2013"},"results":[{"id":"W2625619400","doi":"","title":"Canadian unconventional oil and gas supply and its potential contribution to Asian energy security and sustainable development","year":2013,"lang":"en","type":"article","venue":"Energy Transition and Policy Challenges,36th IAEE International Conference,June 16-20, 2013","topic":"Global Energy Security and Policy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Unconventional oil; Energy security; Fossil fuel; Sustainable development; Energy supply; Energy development; Natural resource economics; Business; Petroleum engineering; Energy (signal processing); Economics; Political science; Geology; Renewable energy; Engineering; Waste management; Law","score_opus":0.010522004406968745,"score_gpt":0.22976544303519042,"score_spread":0.21924343862822168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625619400","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22407846,0.016337955,0.0012481686,0.17508255,0.00091282965,0.00008676625,0.005297904,0.000086902226,0.5768684],"genre_scores_gemma":[0.83916515,0.017480547,0.0017311634,0.0052312715,0.00010553359,0.000033777913,0.0006843075,0.000039193266,0.13552909],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99954164,0.000026922724,0.000008218714,0.000027154227,0.00018936767,0.00020674866],"domain_scores_gemma":[0.9993011,0.000054090284,0.00004643127,0.000011131513,0.00046468727,0.00012255757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004257249,0.00032038105,0.00014804893,0.0010627091,0.0052048997,0.0037602815,0.000642869,0.00094935956,0.014695132],"category_scores_gemma":[0.0015825198,0.00015402668,0.00030639025,0.0031526468,0.0013664445,0.0012019926,0.001107273,0.0011816612,0.0003427625],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042429235,0.00010154481,0.058743518,0.00072690187,0.00009480184,0.0015819924,0.0070832865,0.0048773848,0.0022449954,0.51537275,0.2652056,0.14354293],"study_design_scores_gemma":[0.000026988619,0.000034175457,0.08850253,0.00042990313,0.00007848936,0.00026400827,0.020100042,0.0028807882,0.001551583,0.021290679,0.86473453,0.00010633676],"about_ca_topic_score_codex":0.99586475,"about_ca_topic_score_gemma":0.9988778,"teacher_disagreement_score":0.07666756,"about_ca_system_score_codex":0.07666756,"about_ca_system_score_gemma":0.14973405,"threshold_uncertainty_score":0.5562647},"labels":[],"label_agreement":null},{"id":"W2729205445","doi":"","title":"Alberta wholesale electricity market - Government and industry study","year":2013,"lang":"en","type":"article","venue":"Energy Transition and Policy Challenges,36th IAEE International Conference,June 16-20, 2013","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Government (linguistics); Electricity; Electricity market; Electricity retailing; Wholesale market; Commerce; Industrial organization; Engineering; Electrical engineering","score_opus":0.013327608459823373,"score_gpt":0.22211750406308808,"score_spread":0.20878989560326472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2729205445","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89713204,0.00082450337,0.00040791437,0.0015761238,0.000026827365,0.00007396867,0.0022847177,0.000059864713,0.09761411],"genre_scores_gemma":[0.96217024,0.0004968266,0.00020586145,0.00023963937,0.000016994003,0.000017261094,0.0018606671,0.000015550688,0.03497702],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994487,0.00007572749,0.0000103831835,0.000049609287,0.00020123519,0.00021436946],"domain_scores_gemma":[0.9987902,0.00038104053,0.00015681211,0.00006906445,0.0003469235,0.0002559442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004811094,0.00027210428,0.00036277695,0.001338762,0.0019419538,0.0022541333,0.0011147005,0.0007065012,0.00931284],"category_scores_gemma":[0.0018034598,0.00023651886,0.0003960368,0.003852605,0.00096757535,0.0011362652,0.0006493581,0.0010582246,0.00070021517],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0047954735,0.0043580127,0.5225767,0.00037191066,0.00043649026,0.006121478,0.0054488247,0.047789957,0.00243247,0.19900985,0.116665274,0.08999352],"study_design_scores_gemma":[0.0005674396,0.00048518,0.8280995,0.00009587057,0.00026909757,0.0006481541,0.024095142,0.055802222,0.0016309448,0.011108942,0.07703775,0.00015976484],"about_ca_topic_score_codex":0.95331264,"about_ca_topic_score_gemma":0.9827162,"teacher_disagreement_score":0.97945714,"about_ca_system_score_codex":0.02054286,"about_ca_system_score_gemma":0.015386855,"threshold_uncertainty_score":0.14904958},"labels":[],"label_agreement":null},{"id":"W2734748738","doi":"","title":"Financial transmission rights in Ontario’s wholesale electricity market","year":2013,"lang":"en","type":"article","venue":"Energy Transition and Policy Challenges,36th IAEE International Conference,June 16-20, 2013","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Finance; Electricity; Electricity market; Wholesale market; Commerce; Electrical engineering; Engineering","score_opus":0.022718750817266493,"score_gpt":0.25830931495199916,"score_spread":0.23559056413473267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2734748738","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6116724,0.0008472285,0.00043037444,0.039983217,0.00006824322,0.0000574333,0.0011647932,0.000020815585,0.34575555],"genre_scores_gemma":[0.97353923,0.0002485007,0.000086327396,0.0007490904,0.00002465326,0.000008554003,0.00008395097,0.00000757727,0.02525219],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99857414,0.00014175553,0.00004956673,0.000084907966,0.00042743582,0.0007221501],"domain_scores_gemma":[0.99621284,0.0010570415,0.00042873406,0.00010907625,0.0012889362,0.0009034856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012633981,0.00009027058,0.00022773714,0.0006971097,0.0054544043,0.007199808,0.00076566427,0.0020626434,0.013194345],"category_scores_gemma":[0.0067527313,0.00023936141,0.00025819664,0.0013201149,0.0027686607,0.0024310332,0.001135649,0.0014735613,0.0003391178],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029318256,0.00010617381,0.058868088,0.00011951409,0.000039434006,0.0009968159,0.010775678,0.004995188,0.00072529993,0.8515928,0.053705063,0.017782684],"study_design_scores_gemma":[0.00035597032,0.00008781381,0.36815265,0.00041961164,0.00012761028,0.00032151237,0.042489305,0.020574128,0.0011499601,0.12711823,0.43896008,0.00024312845],"about_ca_topic_score_codex":0.9799896,"about_ca_topic_score_gemma":0.99346703,"teacher_disagreement_score":0.06609877,"about_ca_system_score_codex":0.06609877,"about_ca_system_score_gemma":0.061564635,"threshold_uncertainty_score":0.47958243},"labels":[],"label_agreement":null}]}