{"meta":{"query_hash":"cdf11bdcf260","filters":{"venue":"Energy systems"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/cdf11bdcf260","api":"https://metacan.xera.ac/api/v1/cohort?venue=Energy+systems"},"results":[{"id":"W1721191018","doi":"10.1007/978-3-642-23193-3_2","title":"Optimization-Based Bidding in Day-Ahead Electricity Auction Markets: A Review of Models for Power Producers","year":2011,"lang":"en","type":"review","venue":"Energy systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bidding; Mathematical optimization; Competition (biology); Linear programming; Integer programming; Computer science; Electricity; Schedule; Power system simulation; Stochastic programming; Operations research; Microeconomics; Real-time bidding; Electricity market; Economics; Power (physics); Electric power system; Mathematics; Engineering","score_opus":0.024619086735385612,"score_gpt":0.2457129667967158,"score_spread":0.22109388006133018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1721191018","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028898204,0.8813006,0.103697345,0.0009932631,0.0002856078,0.000056450255,0.00016303048,0.000114681774,0.010499227],"genre_scores_gemma":[0.046748176,0.9155775,0.033034768,0.00032744775,0.0005214233,0.00007503903,0.00030868466,0.000066468725,0.003340432],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993753,0.00020527505,0.00005949085,0.000089284804,0.00023512085,0.00003556483],"domain_scores_gemma":[0.9989065,0.0007335453,0.000101575686,0.000049078666,0.00019011217,0.000019192375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014205667,0.0016228195,0.0028568655,0.0011114135,0.0002483982,0.002051331,0.002528005,0.0011666801,0.0025173835],"category_scores_gemma":[0.0020380102,0.00073933264,0.0013436441,0.0037778101,0.0006162849,0.0024295282,0.00074816233,0.0013324356,0.001040606],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011066202,0.0002720919,0.0007687585,0.008559399,0.00029171977,0.00014967515,0.000065236316,0.18810223,0.0008174952,0.056171335,0.017187009,0.7275043],"study_design_scores_gemma":[0.00011536847,0.00042930088,0.0022053912,0.004410528,0.000660591,0.0013662033,0.00021484797,0.4734235,0.0023453766,0.1510206,0.36359155,0.00021682605],"about_ca_topic_score_codex":0.00267456,"about_ca_topic_score_gemma":0.0032709916,"teacher_disagreement_score":0.0028568655,"about_ca_system_score_codex":0.0007266818,"about_ca_system_score_gemma":0.0011865327,"threshold_uncertainty_score":0.008421421},"labels":[],"label_agreement":null},{"id":"W1913674463","doi":"10.1007/978-3-642-41080-2_2","title":"The Wind Farm Layout Optimization Problem","year":2013,"lang":"en","type":"book-chapter","venue":"Energy systems","topic":"Wind Energy Research and Development","field":"Engineering","cited_by":135,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Wind power; Production (economics); Wake; Work (physics); Computer science; Operations research; Engineering; Electrical engineering; Economics; Aerospace engineering; Mechanical engineering","score_opus":0.008834653011784509,"score_gpt":0.17233139659623609,"score_spread":0.16349674358445157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1913674463","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005442317,0.012107597,0.68246174,0.0023245066,0.0010379174,0.00007974289,0.00054592476,0.00037980961,0.29562047],"genre_scores_gemma":[0.18905732,0.0375179,0.40241224,0.0012346153,0.001737634,0.0004614274,0.0018134003,0.0009616707,0.36480376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997758,0.000069204434,0.000007452299,0.000046462235,0.00008218033,0.000018738545],"domain_scores_gemma":[0.99987817,0.00006978849,0.00000856148,0.0000127084095,0.000022454846,0.000008274073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032832436,0.0014038307,0.0009978091,0.0004552829,0.00037390183,0.0013615198,0.0009974294,0.0012187387,0.0127881225],"category_scores_gemma":[0.0007026607,0.00069043983,0.00074904907,0.00136449,0.0006421951,0.001276806,0.0006227945,0.0016838489,0.0026569762],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034768404,0.000085901425,0.00020685558,0.00047383408,0.000056427096,0.00014382036,0.000059431175,0.45107347,0.0018536624,0.20736796,0.08519491,0.25344893],"study_design_scores_gemma":[0.000049516875,0.00007444445,0.00056978926,0.0002556885,0.00004213065,0.0002719918,0.00009834833,0.39698526,0.001136602,0.38678798,0.21368209,0.00004617959],"about_ca_topic_score_codex":0.0015367694,"about_ca_topic_score_gemma":0.0031889782,"teacher_disagreement_score":0.0127881225,"about_ca_system_score_codex":0.0006911446,"about_ca_system_score_gemma":0.0008287742,"threshold_uncertainty_score":0.04278052},"labels":[],"label_agreement":null}]}