{"meta":{"query_hash":"2234c4cb0aa2","filters":{"venue":"Engineering Construction & Architectural Management"},"cohort_total":67,"direct_labels_cover":0,"predictions_cover":67,"exported":67,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/2234c4cb0aa2","api":"https://metacan.xera.ac/api/v1/cohort?venue=Engineering+Construction+%26+Architectural+Management"},"results":[{"id":"W1920168922","doi":"10.1108/09699981011074574","title":"Dynamic modeling of construction and demolition waste management processes","year":2010,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"U.S. Environmental Protection Agency","keywords":"Demolition waste; Demolition; Mainland China; Reuse; Construction waste; Construct (python library); Engineering; China; Computer science; Civil engineering; Waste management; Geography","score_opus":0.0025344250503433535,"score_gpt":0.1696511504399611,"score_spread":0.16711672538961775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1920168922","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27212754,0.0005201231,0.67315716,0.000713016,0.000108916895,0.00037694882,0.0013040421,0.00091121363,0.05078107],"genre_scores_gemma":[0.9693526,0.00050093356,0.020005578,0.00003950163,0.000015069389,0.0003339635,0.00044554248,0.000040834482,0.00926607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997359,0.000059717215,0.00001867673,0.00007214656,0.000072398194,0.00004119853],"domain_scores_gemma":[0.99981827,0.00006744557,0.000040633655,0.000011614069,0.000048035337,0.000014049916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034084095,0.00073500036,0.00050112314,0.000720564,0.00066611735,0.0014050558,0.0011049007,0.000776317,0.0036649078],"category_scores_gemma":[0.00048257617,0.0003698984,0.0009970024,0.0006628392,0.00058332994,0.0010794268,0.0008494313,0.00049770356,0.00033814542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002135275,0.000030774598,0.0022012175,0.00006156014,0.000022542547,0.000092972725,0.000107702544,0.9842202,0.0013617903,0.0062271305,0.00019949861,0.0054533207],"study_design_scores_gemma":[0.0000104324745,0.00002453703,0.0007143179,0.000008746886,0.000013157947,0.00001441719,0.00005293654,0.99517447,0.00040045634,0.0018547038,0.0017231784,0.000008738017],"about_ca_topic_score_codex":0.033835374,"about_ca_topic_score_gemma":0.013012264,"teacher_disagreement_score":0.033835374,"about_ca_system_score_codex":0.0014255681,"about_ca_system_score_gemma":0.0021030006,"threshold_uncertainty_score":0.067276895},"labels":[],"label_agreement":null},{"id":"W1995059863","doi":"10.1108/ecam-03-2014-0039","title":"Contingency modelling for construction projects using fuzzy-set theory","year":2015,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Contingency; Fuzzy set; Set (abstract data type); Originality; Contingency theory; Novelty; Computer science; Contingency management; Operations research; Fuzzy logic; Management science; Engineering; Artificial intelligence; Knowledge management","score_opus":0.15690749292796488,"score_gpt":0.33596171052028806,"score_spread":0.17905421759232318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1995059863","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021408375,0.00029755116,0.97190565,0.00015973844,0.00002926528,0.00007847884,0.000099738456,0.000112749665,0.005908475],"genre_scores_gemma":[0.8420671,0.000592935,0.15271196,0.000042997992,0.000038233648,0.0002719395,0.00018547632,0.000029480783,0.0040598647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993787,0.00022368957,0.00003699291,0.00007494671,0.00023124035,0.000054376113],"domain_scores_gemma":[0.9992932,0.0004114139,0.00010256026,0.000031332376,0.00012812637,0.000033313245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011184578,0.0006427887,0.00062167895,0.0013336277,0.00066252,0.0015357359,0.001237463,0.00081349834,0.0025506334],"category_scores_gemma":[0.0019841713,0.0003245828,0.0011446844,0.00090835383,0.00059178873,0.0010359293,0.0006564476,0.00091338006,0.00024502559],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000132997375,0.000014937776,0.00066747784,0.000029474077,0.000017682481,0.000058315116,0.00007313558,0.9755948,0.00029944725,0.0136409635,0.0002666513,0.009323806],"study_design_scores_gemma":[0.0000018232826,0.000011118384,0.00017811754,0.000014258777,0.000005949415,0.000017578597,0.000022474065,0.99391264,0.00009570065,0.0052339355,0.0004998077,0.0000064780766],"about_ca_topic_score_codex":0.016191285,"about_ca_topic_score_gemma":0.011720722,"teacher_disagreement_score":0.016191285,"about_ca_system_score_codex":0.0016657867,"about_ca_system_score_gemma":0.0015404123,"threshold_uncertainty_score":0.032194078},"labels":[],"label_agreement":null},{"id":"W1998279864","doi":"10.1108/09699981011038079","title":"A multi‐attribute ranking method for bridge management","year":2010,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Analytic hierarchy process; Ranking (information retrieval); Computer science; Flexibility (engineering); Bridge (graph theory); Rank (graph theory); Asset management; Multiple-criteria decision analysis; Risk analysis (engineering); Decision support system; Operations research; Data mining; Management science; Engineering; Machine learning; Mathematics; Business","score_opus":0.0058518411594203484,"score_gpt":0.22961914591736426,"score_spread":0.22376730475794393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998279864","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006787318,0.00027982568,0.9854615,0.00017890953,0.00008164169,0.00039829506,0.00019993585,0.00036526544,0.006247305],"genre_scores_gemma":[0.15407461,0.00023565136,0.8420073,0.000069488546,0.00004440215,0.00090731855,0.000285939,0.00006796746,0.0023073559],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99345446,0.0037259706,0.00036246737,0.000454984,0.0018134668,0.00018860541],"domain_scores_gemma":[0.9941784,0.0035673399,0.0004276248,0.00031997514,0.001364171,0.00014241325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006119422,0.0009433707,0.0007851734,0.0039783926,0.0010457758,0.0027645852,0.001152059,0.0006361588,0.007921485],"category_scores_gemma":[0.014539474,0.00025992782,0.001064488,0.0052267835,0.0008497686,0.0021583564,0.0011629708,0.0013764676,0.000973541],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019485789,0.00022438039,0.0026135002,0.0008010359,0.00012948089,0.00015075036,0.0011352716,0.060294256,0.0038021381,0.0931067,0.007535589,0.83001214],"study_design_scores_gemma":[0.0000793979,0.0005478465,0.0044104015,0.00043777403,0.0001176972,0.0004249788,0.0013853639,0.8601286,0.0065572895,0.082725994,0.042990953,0.00019368972],"about_ca_topic_score_codex":0.0017378193,"about_ca_topic_score_gemma":0.001915096,"teacher_disagreement_score":0.007921485,"about_ca_system_score_codex":0.0016868392,"about_ca_system_score_gemma":0.0019024306,"threshold_uncertainty_score":0.032362938},"labels":[],"label_agreement":null},{"id":"W2002705739","doi":"10.1108/09699980310489951","title":"The accuracy of housing forecasting in Australia","year":2003,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Housing industry; Quarter (Canadian coin); Private sector; Consensus forecast; Demand forecasting; Business; Actuarial science; Finance; Economics; Operations research; Marketing; Econometrics; Engineering; Geography; Economic growth","score_opus":0.0272948032429649,"score_gpt":0.20434710586729982,"score_spread":0.1770523026243349,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2002705739","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98968154,0.00046907575,0.001489129,0.0008044238,0.000020100097,0.000013981383,0.0003366009,0.00004986825,0.007135424],"genre_scores_gemma":[0.99839646,0.00016949119,0.0005433674,0.0000140726825,0.000007655316,0.0000029693542,0.00024545012,0.0000044493654,0.00061609625],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9968777,0.00089514715,0.0002609256,0.000299228,0.0014800413,0.00018703131],"domain_scores_gemma":[0.9808397,0.0065980265,0.0033823608,0.0018050803,0.007037448,0.00033723278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052237595,0.00017836396,0.00028345498,0.0015501737,0.00046558285,0.0010685353,0.0005186217,0.0003534551,0.00068741833],"category_scores_gemma":[0.03769138,0.00019925227,0.00021537038,0.0021794413,0.00051334524,0.001556256,0.0010422296,0.00052841014,0.00030499048],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024162007,0.00007612476,0.7570183,0.00015056397,0.0001250347,0.00034239076,0.0101681575,0.041036896,0.0016269098,0.0021476152,0.0037604163,0.18330586],"study_design_scores_gemma":[0.000005338038,0.00010448048,0.9094719,0.00006739472,0.000022738419,0.000127363,0.0030716094,0.07839834,0.0010381943,0.0013966408,0.0062553417,0.000040646562],"about_ca_topic_score_codex":0.17062286,"about_ca_topic_score_gemma":0.15271504,"teacher_disagreement_score":0.17062286,"about_ca_system_score_codex":0.002052968,"about_ca_system_score_gemma":0.0014271092,"threshold_uncertainty_score":0.33925945},"labels":[],"label_agreement":null},{"id":"W2005733202","doi":"10.1108/09699981211237111","title":"Modelling industrial construction operations using a multi‐agent resource allocation framework","year":2012,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Resource allocation; Schedule; Scheduling (production processes); Process (computing); Set (abstract data type); Resource (disambiguation); Function (biology); Operations research; Industrial engineering; Mathematical optimization; Distributed computing; Engineering","score_opus":0.028777039970409566,"score_gpt":0.22301367396733698,"score_spread":0.19423663399692742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005733202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05476692,0.00027386093,0.930097,0.00029943,0.000033245542,0.00023736586,0.00015639927,0.00025781355,0.013877923],"genre_scores_gemma":[0.6963807,0.0007100101,0.294791,0.000055863875,0.000024055367,0.0006043166,0.0001764879,0.00006605635,0.007191534],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957556,0.00020560286,0.000021097525,0.00005801452,0.00009105638,0.00004865051],"domain_scores_gemma":[0.9997002,0.0001561854,0.00005702924,0.000022424443,0.00003974022,0.000024437237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060956314,0.0005857085,0.00052076764,0.0005901803,0.00067001075,0.0015019629,0.0013291795,0.0010024833,0.0025755554],"category_scores_gemma":[0.000788846,0.0004339046,0.000839816,0.00071910385,0.00071530946,0.001264964,0.00087223575,0.0007015153,0.00028287424],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000119445185,0.000019378032,0.0001907787,0.000020927167,0.000010706589,0.00003749901,0.000040886942,0.9847401,0.0005709843,0.011631168,0.000105952386,0.0026196195],"study_design_scores_gemma":[0.0000106106645,0.000017176291,0.00011742556,0.0000083752075,0.000008172166,0.000013019155,0.000035829715,0.99399525,0.00018404015,0.004107803,0.0014966697,0.0000056547215],"about_ca_topic_score_codex":0.01597164,"about_ca_topic_score_gemma":0.013807372,"teacher_disagreement_score":0.01597164,"about_ca_system_score_codex":0.0013954072,"about_ca_system_score_gemma":0.0019930853,"threshold_uncertainty_score":0.031757355},"labels":[],"label_agreement":null},{"id":"W2027536824","doi":"10.1108/09699980910988384","title":"Data acquisition from construction sites for tracking purposes","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Process (computing); Data acquisition; Identification (biology); Software; Tracking system; Data collection; Radio-frequency identification; Systems engineering; Real-time computing; Engineering; Artificial intelligence","score_opus":0.0157010747044208,"score_gpt":0.22204554246731106,"score_spread":0.20634446776289025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2027536824","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10226593,0.0006654631,0.8446215,0.00044055938,0.00034250386,0.0019430218,0.0064291935,0.016183237,0.027108677],"genre_scores_gemma":[0.4284813,0.0010156151,0.54521805,0.0002857784,0.00015468177,0.0019657838,0.0076111304,0.00097231445,0.014295306],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99680614,0.00058953546,0.0003115543,0.0006434046,0.0014944127,0.00015499805],"domain_scores_gemma":[0.99299,0.0014703912,0.0008997335,0.001898662,0.0025402328,0.00020093792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020518496,0.00083732815,0.0009034967,0.0036808217,0.00090173795,0.0023159964,0.0013865782,0.00054797105,0.008059498],"category_scores_gemma":[0.0063950187,0.00045757668,0.0004153756,0.0038857185,0.00046279412,0.0016796667,0.0014327051,0.0006466962,0.0051775584],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005814134,0.00028650012,0.029901324,0.00091776997,0.00007322482,0.00035393663,0.0014604378,0.011444522,0.06415765,0.0043055685,0.015749544,0.8707681],"study_design_scores_gemma":[0.0003058701,0.0014869648,0.1397513,0.0013811076,0.00034559713,0.0021310719,0.003406075,0.14420593,0.3961462,0.008400242,0.3018563,0.00058337627],"about_ca_topic_score_codex":0.0048387605,"about_ca_topic_score_gemma":0.0032971387,"teacher_disagreement_score":0.008059498,"about_ca_system_score_codex":0.00058845594,"about_ca_system_score_gemma":0.002079282,"threshold_uncertainty_score":0.026961744},"labels":[],"label_agreement":null},{"id":"W2029178229","doi":"10.1108/09699980410558575","title":"Innovative 3D‐modelling for selecting and locating mobile cranes","year":2004,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Concordia University","funders":"","keywords":"Lift (data mining); Animation; Computer science; Selection (genetic algorithm); Graphics; Industrial engineering; Engineering; Systems engineering; Data mining; Artificial intelligence; Computer graphics (images)","score_opus":0.005183567148387535,"score_gpt":0.18664152059786188,"score_spread":0.18145795344947435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029178229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004401433,0.000055862096,0.9917923,0.000031214255,0.000013247461,0.00005281382,0.00018330719,0.0016641865,0.0018057253],"genre_scores_gemma":[0.09685624,0.00034639722,0.8984164,0.000031092168,0.000009671391,0.00023371045,0.00067565957,0.00028169606,0.0031491227],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995435,0.00009783668,0.000031389158,0.000072680676,0.0002284868,0.00002607427],"domain_scores_gemma":[0.99971217,0.00009611047,0.000023364535,0.000087562585,0.00006314365,0.000017572745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048732196,0.00077194953,0.0007509302,0.0014610953,0.0005170078,0.0014891246,0.0014267246,0.0009898291,0.006176747],"category_scores_gemma":[0.0010079171,0.0007540585,0.001012341,0.0012514365,0.0005168252,0.000993493,0.0013626323,0.0005983331,0.001979813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019556173,0.00010327614,0.0036614935,0.0006701455,0.0001066541,0.00042247493,0.0011218609,0.42901877,0.058419034,0.034173153,0.0066352985,0.46547237],"study_design_scores_gemma":[0.00003647968,0.00004775481,0.00097593374,0.000075029624,0.00004729654,0.00033097313,0.00013055469,0.92683524,0.020228565,0.004158117,0.047070142,0.000063816085],"about_ca_topic_score_codex":0.0046192682,"about_ca_topic_score_gemma":0.007216549,"teacher_disagreement_score":0.006176747,"about_ca_system_score_codex":0.0004759761,"about_ca_system_score_gemma":0.00095300627,"threshold_uncertainty_score":0.020663261},"labels":[],"label_agreement":null},{"id":"W2034659495","doi":"10.1108/ecam-02-2012-0015","title":"A case productivity model for automatic climbing system","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada); Concordia University","funders":"","keywords":"Productivity; Formwork; Bottleneck; Originality; Engineering; Scheduling (production processes); Benchmarking; Futures studies; Industrial engineering; Computer science; Operations research; Operations management; Civil engineering; Artificial intelligence; Business","score_opus":0.006901710517178255,"score_gpt":0.1804127465982569,"score_spread":0.17351103608107865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034659495","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30231965,0.0006180709,0.56695837,0.0014559533,0.00017478205,0.0007115768,0.0031957163,0.0011760421,0.12338981],"genre_scores_gemma":[0.9460102,0.00033683275,0.027491095,0.000045531564,0.000027341965,0.00054715184,0.0009872651,0.00006930814,0.024485348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992493,0.00018835657,0.000043396107,0.00016350366,0.00019555952,0.00015990296],"domain_scores_gemma":[0.99861014,0.00063291565,0.00019589048,0.00005621345,0.00043310426,0.00007166507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011466302,0.0010061599,0.00046044655,0.0016214957,0.0007572774,0.0021671392,0.0016244936,0.0014610202,0.013796643],"category_scores_gemma":[0.0032791095,0.00043007042,0.0010439561,0.0011813286,0.0005377126,0.0012995185,0.0009173034,0.0010914094,0.0014220915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005521288,0.00009986641,0.0027394036,0.00008938591,0.00001476326,0.0003385717,0.00016638584,0.96970886,0.00074462796,0.0143420575,0.0013137725,0.010387029],"study_design_scores_gemma":[0.000009272715,0.000025769286,0.0005968245,0.000014612506,0.000010262139,0.000033603585,0.00007647372,0.99585056,0.00018881669,0.0017851286,0.0014009844,0.000007739247],"about_ca_topic_score_codex":0.03431347,"about_ca_topic_score_gemma":0.017903615,"teacher_disagreement_score":0.03431347,"about_ca_system_score_codex":0.0032065911,"about_ca_system_score_gemma":0.0020024306,"threshold_uncertainty_score":0.06822747},"labels":[],"label_agreement":null},{"id":"W2052242229","doi":"10.1108/ecam-08-2012-0082","title":"Cash flow modeling for construction projects","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Financial Reporting and Valuation Research","field":"Business, Management and Accounting","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cash flow; Cash flow forecasting; Payment; Business; Net present value; Terminal value; Risk analysis (engineering); Actuarial science; Finance; Computer science; Economics; Production (economics)","score_opus":0.022226904737769358,"score_gpt":0.23431931830700295,"score_spread":0.21209241356923358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052242229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19620255,0.0020623761,0.76091456,0.001204892,0.00021163256,0.0005792788,0.0015938737,0.0005293901,0.03670149],"genre_scores_gemma":[0.94197375,0.0014105322,0.04704324,0.000059554743,0.000051112238,0.00044751423,0.0006919163,0.000051219584,0.008271181],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999204,0.0003645039,0.00004705585,0.000117928255,0.00016348924,0.0001030399],"domain_scores_gemma":[0.9984779,0.0009236043,0.00023206645,0.00004618259,0.00025702338,0.00006331295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00196375,0.0010229923,0.0004628303,0.001909416,0.00073360745,0.0016997892,0.0011849367,0.0010620311,0.005673307],"category_scores_gemma":[0.004102007,0.00032737764,0.001162643,0.0017715868,0.00057797163,0.0012185484,0.00073879526,0.001060209,0.00047375428],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003594977,0.0000443705,0.0027739326,0.00007648417,0.000015733429,0.00011580715,0.00014131663,0.9623009,0.00028766633,0.020409565,0.0007662354,0.013032034],"study_design_scores_gemma":[0.0000060527223,0.000028055274,0.0006576741,0.000031845288,0.000011511643,0.000025627947,0.00006569462,0.9899787,0.00012482604,0.0071858973,0.001873273,0.000010920354],"about_ca_topic_score_codex":0.015864639,"about_ca_topic_score_gemma":0.006819016,"teacher_disagreement_score":0.015864639,"about_ca_system_score_codex":0.0019846219,"about_ca_system_score_gemma":0.002685844,"threshold_uncertainty_score":0.031544626},"labels":[],"label_agreement":null},{"id":"W2057214931","doi":"10.1108/ecam-08-2012-0080","title":"Framework for enhanced progress tracking and control of linear projects","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Documentation; Schedule; Computer science; Scheduling (production processes); Project management; Control (management); Operations research; Systems engineering; Industrial engineering; Engineering; Operations management","score_opus":0.030307440907443615,"score_gpt":0.31211288880083515,"score_spread":0.2818054478933915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2057214931","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012092871,0.000054858945,0.99701095,0.000048123817,0.00001982111,0.000060840524,0.000040689672,0.00034579923,0.0012095962],"genre_scores_gemma":[0.23711601,0.00035964724,0.7569516,0.00008021792,0.00010301629,0.0006540001,0.00032902035,0.00017163611,0.004234931],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997666,0.00056042144,0.00016500954,0.0006511277,0.0007367072,0.00022086233],"domain_scores_gemma":[0.99786454,0.00083401566,0.00043157244,0.00024637603,0.0004926931,0.00013084496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002876311,0.0012359687,0.0007817381,0.0013036131,0.0006436381,0.0019448865,0.0021980049,0.0009251706,0.005285426],"category_scores_gemma":[0.0049522817,0.00058821036,0.0012641227,0.0009186246,0.0009686942,0.0016841023,0.0020210326,0.0014590445,0.00096482463],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010824776,0.00012720557,0.0011486145,0.00029501278,0.000049559767,0.00021084255,0.00034289362,0.74984556,0.0045741717,0.10904734,0.0025832206,0.13166729],"study_design_scores_gemma":[0.000021118154,0.00006371915,0.00017113188,0.000031194064,0.000016975971,0.000048450383,0.000038806982,0.9770583,0.0011881551,0.015260791,0.00608289,0.000018482047],"about_ca_topic_score_codex":0.0090201385,"about_ca_topic_score_gemma":0.006875336,"teacher_disagreement_score":0.0090201385,"about_ca_system_score_codex":0.001454959,"about_ca_system_score_gemma":0.003399293,"threshold_uncertainty_score":0.017935276},"labels":[],"label_agreement":null},{"id":"W2060277803","doi":"10.1108/09699980710760676","title":"Issues in the selection of fall prevention and arrest equipment","year":2007,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Legislature; Selection (genetic algorithm); Variety (cybernetics); Risk analysis (engineering); Legislation; Originality; Operations management; Data collection; Production (economics); Engineering; Process management; Engineering management; Operations research; Computer science; Business; Psychology; Political science","score_opus":0.024097676815885084,"score_gpt":0.38656602290246583,"score_spread":0.36246834608658074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060277803","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6505608,0.010048679,0.11053837,0.024056926,0.000977844,0.0018816494,0.0004473716,0.00078825006,0.20070015],"genre_scores_gemma":[0.935048,0.0025246039,0.0460621,0.0013071162,0.00018015836,0.0004929257,0.00019901151,0.0001611609,0.014024916],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9490987,0.029453902,0.00432075,0.0019863853,0.01362666,0.0015135976],"domain_scores_gemma":[0.9228055,0.048563812,0.009543501,0.003790864,0.013830495,0.0014658103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.028577901,0.00047572821,0.0003620533,0.0035375617,0.0039318516,0.0042692497,0.002204533,0.0010958026,0.009068683],"category_scores_gemma":[0.06917339,0.0005860246,0.0003762216,0.0018400301,0.0029071067,0.0031088695,0.0016194698,0.0008556194,0.0029883673],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025792688,0.00039991224,0.13836367,0.0016614631,0.00003881944,0.00089632877,0.03183092,0.0012854693,0.0052174213,0.015735278,0.017459514,0.78685325],"study_design_scores_gemma":[0.00010505345,0.0020483795,0.4719451,0.0083064865,0.00011985975,0.006980186,0.14353923,0.004496709,0.016009912,0.019928714,0.3261445,0.0003758234],"about_ca_topic_score_codex":0.0048607467,"about_ca_topic_score_gemma":0.010323577,"teacher_disagreement_score":0.028577901,"about_ca_system_score_codex":0.0022374825,"about_ca_system_score_gemma":0.004145283,"threshold_uncertainty_score":0.15113622},"labels":[],"label_agreement":null},{"id":"W2060851341","doi":"10.1108/09699980610669705","title":"A knowledge‐based automated development permit approval process in the housing industry","year":2006,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Husky Energy (Canada); University of Alberta","funders":"","keywords":"Process (computing); Computer science; Context (archaeology); Productivity; Process management; Automation; Engineering management; Systems engineering; Risk analysis (engineering); Software engineering; Engineering; Business","score_opus":0.00657935767341986,"score_gpt":0.20934954724409463,"score_spread":0.20277018957067477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060851341","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29109094,0.0001693266,0.6729371,0.0004286881,0.000039005445,0.0023371696,0.00043127456,0.01144408,0.021122407],"genre_scores_gemma":[0.48709095,0.00014480125,0.50629646,0.00006175601,0.000007987322,0.00038906094,0.0005655962,0.00010594492,0.0053374185],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986021,0.0004373422,0.000101655874,0.0002938572,0.0004807084,0.00008441943],"domain_scores_gemma":[0.9973706,0.0010332634,0.00018030203,0.000641202,0.0006655718,0.00010903973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016973474,0.00035551656,0.0003355556,0.00086761557,0.0008107295,0.0020579277,0.0017077789,0.0008234591,0.005661084],"category_scores_gemma":[0.00471759,0.00045199582,0.00036547065,0.00057242025,0.00069679355,0.0016431849,0.0010739159,0.00043442962,0.0009602843],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008935389,0.0022260796,0.007915719,0.00069351756,0.000056518275,0.0018058796,0.0042998926,0.055981874,0.08752966,0.011116925,0.0058623073,0.8216181],"study_design_scores_gemma":[0.00072258007,0.002512966,0.028483588,0.00041191874,0.000248025,0.0018663607,0.0036793235,0.7616935,0.11613183,0.0064702607,0.07749523,0.00028446596],"about_ca_topic_score_codex":0.015998116,"about_ca_topic_score_gemma":0.013084971,"teacher_disagreement_score":0.015998116,"about_ca_system_score_codex":0.001293121,"about_ca_system_score_gemma":0.0030971179,"threshold_uncertainty_score":0.031809986},"labels":[],"label_agreement":null},{"id":"W2071095200","doi":"10.1108/09699980910970851","title":"Integrating numerical tools in underground construction process","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Process (computing); Frame (networking); Reduction (mathematics); Computer science; Cost reduction; Pre-construction services; Construction management; Quality (philosophy); Excavation; Control (management); Industrial engineering; Project management; Construction engineering; Systems engineering; Engineering; Civil engineering; Project planning","score_opus":0.006681775821354997,"score_gpt":0.21145156237560617,"score_spread":0.20476978655425118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071095200","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10521859,0.00027864793,0.8784444,0.00022816769,0.00002986032,0.0001224648,0.00004677687,0.0005875065,0.015043508],"genre_scores_gemma":[0.68889827,0.00031541724,0.30895126,0.000020773174,0.000008501392,0.00010061794,0.000039947703,0.00008700087,0.0015782757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99833554,0.0007173551,0.00010114317,0.00015820238,0.0006005879,0.00008723062],"domain_scores_gemma":[0.9967809,0.0019715535,0.00035968542,0.00047332497,0.0003632689,0.00005124698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016706175,0.00045927175,0.00039807038,0.0009363676,0.0006731062,0.0016305145,0.00062731985,0.0004874922,0.0027545504],"category_scores_gemma":[0.005251719,0.0003994158,0.00039399412,0.0011078618,0.00137349,0.0011046113,0.001485914,0.00047376327,0.0004897831],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018540374,0.00018230108,0.011799892,0.00047952222,0.00003486059,0.00044385385,0.0013856088,0.6953066,0.019041339,0.066672474,0.00051271403,0.20395537],"study_design_scores_gemma":[0.000036092377,0.00013199676,0.0041489652,0.00012592731,0.0000392381,0.00038584854,0.00073814014,0.93078285,0.01374613,0.030798279,0.019017896,0.00004856241],"about_ca_topic_score_codex":0.0048487335,"about_ca_topic_score_gemma":0.0039466606,"teacher_disagreement_score":0.0048487335,"about_ca_system_score_codex":0.0009773718,"about_ca_system_score_gemma":0.0021974307,"threshold_uncertainty_score":0.009640992},"labels":[],"label_agreement":null},{"id":"W2081367740","doi":"10.1108/09699981211192562","title":"New life‐cycle costing approach for infrastructure rehabilitation","year":2012,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Markov decision process; Life cycle costing; Markov chain; Process (computing); Activity-based costing; Computer science; Probabilistic logic; Rehabilitation; Operations research; Markov model; Originality; Risk analysis (engineering); Plan (archaeology); Markov process; Engineering; Operations management; Artificial intelligence; Business; Mathematics; Machine learning","score_opus":0.00324109585649292,"score_gpt":0.18569748785225487,"score_spread":0.18245639199576194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081367740","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0051406696,0.00085278956,0.9769513,0.0003076983,0.00008044231,0.00023114431,0.00025441643,0.00008897107,0.016092531],"genre_scores_gemma":[0.5920912,0.0025684484,0.38407704,0.00021014946,0.00012291025,0.001330059,0.00077746523,0.00019186734,0.018630862],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99906224,0.00028147112,0.000037784062,0.00015192006,0.0003782875,0.00008832867],"domain_scores_gemma":[0.99928194,0.00034567714,0.00007370617,0.000041974563,0.00022229992,0.000034448563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012573585,0.0013161803,0.000918839,0.0018622536,0.0004894923,0.0013982202,0.0017017672,0.0009444958,0.0077069616],"category_scores_gemma":[0.0025369711,0.00053760136,0.0013701806,0.0018283563,0.0005803865,0.0012754871,0.0007903983,0.0015500026,0.0005769418],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011699121,0.000033644297,0.00036534003,0.0001508975,0.000027436743,0.00005465656,0.000028955055,0.91465515,0.00048087657,0.043934852,0.0012322997,0.039024163],"study_design_scores_gemma":[0.0000048033407,0.000025903077,0.00020834866,0.000032669723,0.000014856483,0.000038625367,0.000016450855,0.9771517,0.00026165295,0.017697811,0.004535881,0.000011338804],"about_ca_topic_score_codex":0.013037384,"about_ca_topic_score_gemma":0.010523693,"teacher_disagreement_score":0.013037384,"about_ca_system_score_codex":0.003495919,"about_ca_system_score_gemma":0.003032126,"threshold_uncertainty_score":0.025923014},"labels":[],"label_agreement":null},{"id":"W2082743576","doi":"10.1108/eb021210","title":"Risk management trends in the construction industry: moving towards joint risk management","year":2002,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":99,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Enthusiasm; Risk management; China; Mainland China; Teamwork; Risk perception; Business; Work (physics); Public relations; Perception; Political science; Psychology; Finance; Engineering; Social psychology; Law","score_opus":0.035607113796057265,"score_gpt":0.33344826250794485,"score_spread":0.2978411487118876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082743576","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99548495,0.00027636508,0.00067660364,0.0010562801,0.000009327518,0.000023291801,0.000021456883,0.000005046822,0.0024466955],"genre_scores_gemma":[0.99825364,0.00032198336,0.00068032916,0.00013274545,0.000017038636,0.000014657913,0.000038506805,0.0000023732528,0.00053870614],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9944383,0.0018904136,0.0005531257,0.00046617712,0.002075183,0.0005768288],"domain_scores_gemma":[0.9716945,0.00638046,0.012372207,0.00093440065,0.0071469215,0.0014714816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010582236,0.00020081451,0.0002492501,0.0020207951,0.0015730986,0.003777638,0.000744102,0.0009500752,0.00133502],"category_scores_gemma":[0.01724833,0.00030664334,0.00024546238,0.0023348927,0.0017934914,0.0040797824,0.0022277643,0.0015551175,0.00019172889],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013508821,0.00022446043,0.7676511,0.00036824727,0.000029293242,0.00029986625,0.16160867,0.0004550357,0.002839029,0.0031864722,0.00071958423,0.06248316],"study_design_scores_gemma":[0.00000609751,0.00032708977,0.8153526,0.00012034211,0.00001034933,0.00026980235,0.17353337,0.0007382285,0.00064844853,0.0005816149,0.008371677,0.00004027943],"about_ca_topic_score_codex":0.025674399,"about_ca_topic_score_gemma":0.031547055,"teacher_disagreement_score":0.025674399,"about_ca_system_score_codex":0.0036336177,"about_ca_system_score_gemma":0.0035246843,"threshold_uncertainty_score":0.055964887},"labels":[],"label_agreement":null},{"id":"W2085746308","doi":"10.1108/09699980610669679","title":"Internet‐based database management system for project control","year":2006,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Advanced Database Systems and Queries","field":"Computer Science","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Earned value management; Work breakdown structure; Project planning; Computer science; Schedule; Project management triangle; Project management; Integrated project delivery; Database; Procurement; Engineering management; Systems engineering; Project charter; Engineering","score_opus":0.007249666930738565,"score_gpt":0.2032218018514673,"score_spread":0.19597213492072874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085746308","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015776357,0.0024238352,0.8541833,0.0010224121,0.000489967,0.0011714536,0.004186306,0.08763986,0.03310658],"genre_scores_gemma":[0.38344043,0.003811105,0.51497763,0.0015684763,0.000990593,0.003124176,0.033655137,0.0029284696,0.055503946],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971311,0.0006626623,0.00042462672,0.0005299565,0.0011033356,0.00014831456],"domain_scores_gemma":[0.9967843,0.00052467507,0.00020856911,0.0008970552,0.0012953642,0.0002900626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003288516,0.0005658042,0.0009151402,0.0027549749,0.00086072844,0.0038762395,0.0026590822,0.0008044242,0.01365121],"category_scores_gemma":[0.0042615826,0.0004293732,0.00041794378,0.0026886887,0.00033696872,0.0030051442,0.0012593672,0.0011090307,0.009974224],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009887383,0.00066382706,0.0050790785,0.000553472,0.00018369354,0.0006178786,0.0004373317,0.008934601,0.024894811,0.032576233,0.18707363,0.7379967],"study_design_scores_gemma":[0.00067276694,0.00051940145,0.0070269527,0.00028391398,0.00030286887,0.0018094986,0.00029956282,0.24069385,0.055413593,0.020168036,0.67255056,0.0002590462],"about_ca_topic_score_codex":0.0020050062,"about_ca_topic_score_gemma":0.0008082318,"teacher_disagreement_score":0.01365121,"about_ca_system_score_codex":0.00095585216,"about_ca_system_score_gemma":0.0014874118,"threshold_uncertainty_score":0.045667887},"labels":[],"label_agreement":null},{"id":"W2102270393","doi":"10.1108/09699980310478412","title":"Photo‐net: an integrated system for controlling construction progress","year":2003,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Network for Business Sustainability","funders":"","keywords":"Computer science; Critical path method; Animation; Scheduling (production processes); Path (computing); Real-time computing; Systems engineering; Operating system; Computer graphics (images); Engineering","score_opus":0.00492735959806024,"score_gpt":0.18732480764713247,"score_spread":0.18239744804907224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102270393","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029397437,0.00044403,0.7940639,0.00018516263,0.0004576386,0.00084751524,0.00340183,0.14638174,0.02482084],"genre_scores_gemma":[0.25632042,0.00063980295,0.65864897,0.0003801972,0.00019447957,0.0015889439,0.0050756405,0.004608444,0.07254309],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993488,0.00006151978,0.000030171628,0.0001932129,0.0003283476,0.000038008486],"domain_scores_gemma":[0.9992223,0.00022412922,0.00007548806,0.00015186096,0.0002095697,0.000116618525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062670885,0.00073558267,0.00059909775,0.0013504878,0.00036663815,0.0009592117,0.0017137652,0.00055856776,0.029068038],"category_scores_gemma":[0.0012176121,0.0005955007,0.00024632583,0.000855826,0.00028679008,0.0012947657,0.0010304482,0.00051437115,0.004951114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024054952,0.00057992333,0.005862892,0.0007764074,0.00011547346,0.0003323134,0.00046018825,0.00990274,0.1303611,0.0053620157,0.09205127,0.75179017],"study_design_scores_gemma":[0.0006409742,0.0011431348,0.024271583,0.00019027978,0.00035939526,0.0014312848,0.00025940835,0.33326545,0.21022396,0.0046820207,0.42302877,0.0005037231],"about_ca_topic_score_codex":0.003060779,"about_ca_topic_score_gemma":0.0046294476,"teacher_disagreement_score":0.029068038,"about_ca_system_score_codex":0.0005941327,"about_ca_system_score_gemma":0.0007464223,"threshold_uncertainty_score":0.097242236},"labels":[],"label_agreement":null},{"id":"W2530165229","doi":"10.1108/ecam-01-2015-0013","title":"Evaluation of automation levels for construction change management","year":2016,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workflow; Automation; Computer science; Process (computing); Process management; Traceability; Change management (ITSM); Business process; Change order; Risk analysis (engineering); Project management; Systems engineering; Work in process; Engineering; Operations management; Software engineering; Business; Program management; Database","score_opus":0.12889166547744968,"score_gpt":0.42727956253963806,"score_spread":0.2983878970621884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2530165229","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9659364,0.00028345856,0.027354892,0.00017102249,0.000026474958,0.00053034537,0.00026753964,0.00041913922,0.0050107385],"genre_scores_gemma":[0.98636013,0.000038157905,0.013113788,0.000012063779,0.000004882149,0.00014696328,0.00012685663,0.000014491122,0.00018258192],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9820971,0.008088353,0.0013036964,0.0012788494,0.0065866397,0.00064527313],"domain_scores_gemma":[0.91212493,0.051355585,0.014439433,0.006784483,0.013363339,0.001932147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012296656,0.0005749774,0.00047195182,0.0027047612,0.0007562353,0.0028602213,0.0008142871,0.00076950557,0.0019872077],"category_scores_gemma":[0.061094932,0.0002624647,0.00069237873,0.0015706066,0.0009976788,0.0020215616,0.0012869855,0.00064772717,0.00032906045],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0050486773,0.0024101955,0.46871305,0.0012256155,0.0004851248,0.00014606779,0.0031776044,0.11031683,0.019299503,0.007386207,0.0012603917,0.38053074],"study_design_scores_gemma":[0.00038417015,0.0219341,0.6165058,0.00051911594,0.0005967317,0.0002931407,0.0052129165,0.29813337,0.03843065,0.009731679,0.007975266,0.00028298283],"about_ca_topic_score_codex":0.0024284374,"about_ca_topic_score_gemma":0.0018958551,"teacher_disagreement_score":0.012296656,"about_ca_system_score_codex":0.0026670052,"about_ca_system_score_gemma":0.0018541366,"threshold_uncertainty_score":0.06503177},"labels":[],"label_agreement":null},{"id":"W2555012946","doi":"10.1108/ecam-05-2014-0069","title":"Optimized scheduling and buffering of repetitive construction projects under uncertainty","year":2016,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Computer science; Construction management; Operations research; Industrial engineering; Systems engineering; Risk analysis (engineering); Engineering; Operations management; Business; Civil engineering","score_opus":0.030402780990002504,"score_gpt":0.2825019141844581,"score_spread":0.2520991331944556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2555012946","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25178966,0.00010498543,0.7442163,0.00008192845,0.000013894184,0.00016242018,0.00007370415,0.00028379474,0.0032732852],"genre_scores_gemma":[0.87030214,0.000046524547,0.1286943,0.000009356805,0.000004514884,0.000074321775,0.000067064,0.000027106309,0.00077465374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960953,0.00011171427,0.000021824386,0.00008164505,0.00010257727,0.00007267813],"domain_scores_gemma":[0.9991486,0.00046143527,0.00016866364,0.000040228584,0.00013346427,0.00004750911],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092615007,0.0005311546,0.000585677,0.00063759886,0.00043220096,0.0007156586,0.0007722666,0.00042425323,0.0013754037],"category_scores_gemma":[0.001934171,0.00029365742,0.0003331203,0.0006119008,0.00036501177,0.00046466966,0.0004884141,0.00037523644,0.00010141423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051491792,0.000021945643,0.00042392832,0.000017199593,0.0000062927693,0.00002772116,0.000040151634,0.97497296,0.0013418993,0.0014856908,0.00010354596,0.021507181],"study_design_scores_gemma":[0.0000065602985,0.000040594736,0.0001797234,0.0000035051912,0.0000041011663,0.000007674464,0.000021985936,0.99755836,0.0012365166,0.0007988266,0.00013872089,0.0000034726042],"about_ca_topic_score_codex":0.0072867046,"about_ca_topic_score_gemma":0.005192808,"teacher_disagreement_score":0.0072867046,"about_ca_system_score_codex":0.0011592872,"about_ca_system_score_gemma":0.0016504421,"threshold_uncertainty_score":0.014488578},"labels":[],"label_agreement":null},{"id":"W2579467647","doi":"10.1108/ecam-10-2015-0165","title":"A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects","year":2017,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Interdependence; Computer science; Workflow; Limit (mathematics); Operations research; Project planning; Time limit; Industrial engineering; Project management; Risk analysis (engineering); Reliability engineering; Systems engineering; Engineering","score_opus":0.12838311081123782,"score_gpt":0.3491864539085802,"score_spread":0.2208033430973424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2579467647","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0112019535,0.00010944338,0.9846117,0.00021213564,0.000019689262,0.00006573379,0.00007399514,0.0001632477,0.003542155],"genre_scores_gemma":[0.673846,0.00026150377,0.32071912,0.00016706466,0.000044449553,0.0005527504,0.00026996023,0.00018980006,0.0039493856],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99701536,0.0015930745,0.00012713308,0.00036471666,0.00067600847,0.00022362461],"domain_scores_gemma":[0.9897954,0.0071278787,0.0010408798,0.00042076825,0.0012604444,0.00035464135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0078896815,0.00095464394,0.0010799911,0.002011078,0.00067032623,0.0032890223,0.0032928435,0.0014415199,0.005245707],"category_scores_gemma":[0.019988561,0.0012287485,0.0016184564,0.001205159,0.0015777474,0.002088639,0.0028907643,0.0022509615,0.00046173856],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028701352,0.000021055368,0.00050695165,0.000028215718,0.000025270514,0.000042076434,0.000053706244,0.9773293,0.0001664941,0.016468817,0.00015246787,0.0051769023],"study_design_scores_gemma":[0.000003807013,0.000015276097,0.00006687116,0.000007823098,0.000006779069,0.0000074655786,0.0000111558165,0.99429685,0.000099196666,0.0052522575,0.0002252932,0.000007175018],"about_ca_topic_score_codex":0.015673725,"about_ca_topic_score_gemma":0.0086611975,"teacher_disagreement_score":0.015673725,"about_ca_system_score_codex":0.002866792,"about_ca_system_score_gemma":0.0030866782,"threshold_uncertainty_score":0.04172516},"labels":[],"label_agreement":null},{"id":"W2892260798","doi":"10.1108/ecam-04-2017-0068","title":"Quality cost of material procurement in construction projects","year":2018,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Procurement; Quality assurance; Quality (philosophy); Cost reduction; Process (computing); Operations management; Computer science; Business; Risk analysis (engineering); Process management; Engineering; Marketing","score_opus":0.05916172171760306,"score_gpt":0.3398656009049161,"score_spread":0.280703879187313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2892260798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89074546,0.0016244489,0.07749336,0.00097497937,0.00007086986,0.00046759952,0.00039227644,0.000098353004,0.028132686],"genre_scores_gemma":[0.99523735,0.00019846635,0.0031383154,0.00001157032,0.0000046632904,0.000049674258,0.00006338123,0.000011974088,0.0012846297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9954432,0.0020811546,0.00018769622,0.00021062116,0.0015284552,0.0005488514],"domain_scores_gemma":[0.98703325,0.0089408755,0.0017798503,0.0004556184,0.0014417227,0.00034857632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042535304,0.0004379771,0.0004191076,0.0014512644,0.0006765269,0.0029798325,0.0009053266,0.0008093736,0.0031334222],"category_scores_gemma":[0.014227615,0.0005944867,0.0007545059,0.0016903422,0.0011266689,0.0017324341,0.0009938708,0.001114709,0.00027907203],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030376963,0.00019246449,0.04223927,0.00025388936,0.00007099494,0.00036209854,0.00029086307,0.8750052,0.0013064925,0.025940444,0.0008341648,0.053200364],"study_design_scores_gemma":[0.000041827545,0.0008885306,0.0767535,0.00018115283,0.00011403764,0.00035905943,0.001603975,0.8965665,0.0028379937,0.016730469,0.0037940477,0.00012891422],"about_ca_topic_score_codex":0.01584655,"about_ca_topic_score_gemma":0.011824699,"teacher_disagreement_score":0.01584655,"about_ca_system_score_codex":0.0072818287,"about_ca_system_score_gemma":0.003581776,"threshold_uncertainty_score":0.052833557},"labels":[],"label_agreement":null},{"id":"W2944277995","doi":"10.1108/ecam-05-2018-0217","title":"Multi-objective optimization for repetitive scheduling under uncertainty","year":2019,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Computer science; Mathematical optimization; Duration (music); Scheduling (production processes); Fuzzy logic; Genetic algorithm; Reliability engineering; Mathematics; Engineering","score_opus":0.03050651757581384,"score_gpt":0.303171025998577,"score_spread":0.27266450842276313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2944277995","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020756142,0.00020121361,0.97629136,0.000048788424,0.000016177413,0.000048670292,0.00003813183,0.00011891081,0.0024805062],"genre_scores_gemma":[0.6188334,0.0002723778,0.376638,0.000048552633,0.000031746327,0.00030056,0.00015538518,0.0001302625,0.003589755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992793,0.00023288128,0.000031878506,0.00010864195,0.00028446649,0.00006280924],"domain_scores_gemma":[0.9992705,0.000442838,0.00012242825,0.000027771182,0.00011299052,0.000023342276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012993279,0.0008680951,0.000836761,0.0008042932,0.00037443708,0.00071900414,0.0008358155,0.00062719913,0.0016398795],"category_scores_gemma":[0.00185844,0.0004538995,0.0011053855,0.0006583874,0.00031794223,0.000578281,0.0005947472,0.000829794,0.00017989296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010563506,0.000012253496,0.00012147703,0.000030754123,0.000017948356,0.000018798399,0.000017757227,0.98862386,0.00073379313,0.0010005726,0.00007000944,0.009342211],"study_design_scores_gemma":[0.000002909633,0.000018271605,0.00008536734,0.000004545491,0.000004310283,0.0000060157467,0.0000054712655,0.99877685,0.0002824729,0.0006234415,0.00018726956,0.00000309389],"about_ca_topic_score_codex":0.0051487405,"about_ca_topic_score_gemma":0.004102808,"teacher_disagreement_score":0.0051487405,"about_ca_system_score_codex":0.0009001979,"about_ca_system_score_gemma":0.001336341,"threshold_uncertainty_score":0.010237515},"labels":[],"label_agreement":null},{"id":"W2983521989","doi":"10.1108/ecam-03-2019-0119","title":"The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms","year":2019,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Knowledge management; Organizational structure; Informal organization; Perspective (graphical); Social network analysis; Architecture; Organizational network analysis; Digital transformation; Business; Computer science; Organizational learning; Social media; Management; World Wide Web","score_opus":0.0017285913169389174,"score_gpt":0.17155000174461318,"score_spread":0.16982141042767426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2983521989","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98811626,0.000108304856,0.00052759435,0.0006931044,0.000007604578,0.00002922108,0.000029256327,0.000008941705,0.010479697],"genre_scores_gemma":[0.99945194,0.00003464966,0.00013832451,0.000030808464,0.000003152558,0.000007507427,0.00001846266,0.0000018118576,0.00031338356],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9915035,0.0037821864,0.0003444398,0.00066659483,0.0018938085,0.0018094904],"domain_scores_gemma":[0.9686322,0.014827486,0.007031082,0.0019369961,0.0030518759,0.0045202947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045234673,0.00021421532,0.00017915742,0.0025103958,0.002599752,0.0064536463,0.00078883325,0.0007239618,0.0036138063],"category_scores_gemma":[0.020801254,0.00016856272,0.00022124482,0.001993778,0.0044538076,0.0033406424,0.0057056556,0.0009971248,0.00029052235],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003454647,0.0008839659,0.69469136,0.00020654577,0.000095155454,0.0019725913,0.101106755,0.0041328464,0.0043357173,0.048149984,0.0017090592,0.14237052],"study_design_scores_gemma":[0.000023638797,0.0003106399,0.8054691,0.00011053399,0.000023854049,0.0003068872,0.17163128,0.0030281679,0.00097522046,0.007182124,0.010889652,0.00004885537],"about_ca_topic_score_codex":0.013468732,"about_ca_topic_score_gemma":0.024373116,"teacher_disagreement_score":0.013468732,"about_ca_system_score_codex":0.007874203,"about_ca_system_score_gemma":0.0038841204,"threshold_uncertainty_score":0.057131648},"labels":[],"label_agreement":null},{"id":"W3009200285","doi":"10.1108/ecam-04-2019-0222","title":"Revolutionising cost structure for integrated project delivery: a BIM-based solution","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Activity-based costing; Integrated project delivery; Building information modeling; Computer science; Estimation; Risk analysis (engineering); Work breakdown structure; Profit (economics); Project management; Reliability engineering; Systems engineering; Operations research; Operations management; Project planning; Engineering; Business; Scheduling (production processes)","score_opus":0.011215618689256033,"score_gpt":0.1998241615331839,"score_spread":0.1886085428439279,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009200285","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004365174,0.0007063133,0.983993,0.0009598786,0.000054229207,0.00018449777,0.00011619982,0.00027305802,0.0093477],"genre_scores_gemma":[0.1301446,0.0018660353,0.8633281,0.00013106356,0.000051478364,0.00046728918,0.00038516542,0.00013179767,0.0034945433],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9909923,0.0032199495,0.00049852196,0.0006188824,0.004313805,0.00035649238],"domain_scores_gemma":[0.99444205,0.0017378854,0.00074324326,0.0008069445,0.0020769509,0.0001928605],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069076545,0.001461712,0.0009997978,0.0064945985,0.0010152545,0.005733445,0.003338365,0.0017891123,0.004798199],"category_scores_gemma":[0.013164484,0.0009930993,0.0013451031,0.0063256333,0.0013003615,0.0061292523,0.005056543,0.0020781404,0.0011877386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048349186,0.00018887692,0.0021273512,0.00083702157,0.00008605606,0.00016834015,0.000530835,0.22271575,0.0020885486,0.31564623,0.00420166,0.45136088],"study_design_scores_gemma":[0.000045259956,0.00020459208,0.0027353058,0.0010750408,0.00013230374,0.0004781054,0.0014836851,0.66758996,0.0044656536,0.23266603,0.08899636,0.00012766919],"about_ca_topic_score_codex":0.004236191,"about_ca_topic_score_gemma":0.003526909,"teacher_disagreement_score":0.0069076545,"about_ca_system_score_codex":0.0038994465,"about_ca_system_score_gemma":0.0058586136,"threshold_uncertainty_score":0.036531627},"labels":[],"label_agreement":null},{"id":"W3029097617","doi":"10.1108/ecam-01-2020-0017","title":"BIM-based life-cycle environmental assessment of prefabricated buildings","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Prefabrication; Building information modeling; Resource consumption; Life-cycle assessment; Apartment; Environmental impact assessment; Architectural engineering; Resource (disambiguation); Engineering; Construction engineering; Civil engineering; Environmental resource management; Computer science; Environmental science; Operations management; Production (economics)","score_opus":0.004704900180745781,"score_gpt":0.1798748500605162,"score_spread":0.17516994987977041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3029097617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6330246,0.0008138352,0.33890867,0.00015438319,0.000034830744,0.0003614802,0.0017318027,0.000612,0.024358405],"genre_scores_gemma":[0.9321291,0.00035267227,0.06475039,0.0000140583925,0.0000046436567,0.00012658213,0.0010962166,0.0000414704,0.0014849197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99889827,0.00034440446,0.00004147844,0.00008151664,0.0005540225,0.00008033118],"domain_scores_gemma":[0.99941576,0.00013671521,0.00010524107,0.00009143085,0.00022606057,0.000024929765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010259378,0.00078066497,0.00040955478,0.0028109658,0.00035623106,0.0014740946,0.0006495032,0.00045835134,0.0016439877],"category_scores_gemma":[0.001910584,0.00031240607,0.00071831205,0.0024728114,0.0003164677,0.0014060108,0.001174147,0.00031507536,0.00033675996],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002232058,0.00028364218,0.03694229,0.00037611858,0.00012895316,0.0002546595,0.00031854032,0.7382524,0.011333213,0.0072263433,0.0008962027,0.20376444],"study_design_scores_gemma":[0.000012215382,0.00023797147,0.04307639,0.0000866309,0.00006737427,0.00020663512,0.0006280066,0.93553853,0.009953618,0.0044970913,0.0056434767,0.000052069903],"about_ca_topic_score_codex":0.005238859,"about_ca_topic_score_gemma":0.009472993,"teacher_disagreement_score":0.005238859,"about_ca_system_score_codex":0.0010816396,"about_ca_system_score_gemma":0.0008547853,"threshold_uncertainty_score":0.010416746},"labels":[],"label_agreement":null},{"id":"W3037746521","doi":"10.1108/ecam-06-2019-0314","title":"Exploring and verifying BIM-based energy simulation for building operations","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Building information modeling; Energy consumption; Unavailability; Simulation software; Computer science; Process (computing); Systems engineering; Schedule; Building energy simulation; Energy modeling; Software; Reliability engineering; Simulation; Engineering; Energy performance; Operating system","score_opus":0.03669529932917424,"score_gpt":0.21118488170000682,"score_spread":0.1744895823708326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037746521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29101422,0.0002053822,0.6750347,0.00050764804,0.00013595962,0.0004370565,0.0011181105,0.00507765,0.026469164],"genre_scores_gemma":[0.8876849,0.00013998042,0.10972565,0.000056787554,0.000009814062,0.00023415251,0.00074963004,0.00017404338,0.00122494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974268,0.0009962292,0.00017098176,0.00020185055,0.0010461443,0.00015795999],"domain_scores_gemma":[0.9968811,0.0014014301,0.00022704608,0.0007999739,0.0006189187,0.00007150899],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037593674,0.00083088945,0.00059237477,0.0010897808,0.0007220729,0.0019795331,0.0014993007,0.0010733958,0.002911889],"category_scores_gemma":[0.0077133863,0.00047598497,0.001016232,0.00076252787,0.0012720665,0.0018821573,0.0019128954,0.0008422723,0.00057157414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013020466,0.00015681853,0.004021726,0.0001188927,0.00003678673,0.00016102819,0.00019915415,0.94886863,0.00354933,0.02454197,0.0005855995,0.017629765],"study_design_scores_gemma":[0.000018811055,0.000044566823,0.00075487985,0.000028906608,0.000011796358,0.000033416847,0.000098070814,0.9881344,0.004676346,0.0032023625,0.0029815843,0.000014800408],"about_ca_topic_score_codex":0.011682187,"about_ca_topic_score_gemma":0.0063556395,"teacher_disagreement_score":0.011682187,"about_ca_system_score_codex":0.0016178117,"about_ca_system_score_gemma":0.002866331,"threshold_uncertainty_score":0.023228347},"labels":[],"label_agreement":null},{"id":"W3039556242","doi":"10.1108/ecam-01-2019-0069","title":"A decision support tool for planning module installation in industrial construction","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Plan (archaeology); Heuristic; Swing; Systems engineering; Engineering; Computer science; Industrial engineering; Operations research; Mechanical engineering","score_opus":0.015953008632236886,"score_gpt":0.2118610136929956,"score_spread":0.1959080050607587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039556242","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017836234,0.00010831934,0.97193855,0.00014303268,0.000025718778,0.00034745727,0.00092679786,0.0039576027,0.0047164094],"genre_scores_gemma":[0.13769214,0.00013993,0.8590408,0.000051181705,0.000010140653,0.00048177244,0.00094767794,0.00013381636,0.001502544],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994024,0.00018333028,0.000059289752,0.000118313765,0.00017267035,0.000064009575],"domain_scores_gemma":[0.9984522,0.0010795037,0.00013684547,0.00007998142,0.00017450501,0.00007693133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013842131,0.0012782728,0.00082167116,0.0015614704,0.000732473,0.0015946985,0.0018075797,0.0012548467,0.011072953],"category_scores_gemma":[0.0027964315,0.0008370497,0.0007218747,0.0012956194,0.00045583746,0.0009543715,0.0009930577,0.0008698807,0.0013191219],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019670815,0.0002997788,0.0016336172,0.00050040457,0.00006433713,0.0004214287,0.00024375891,0.745897,0.004997343,0.010922068,0.0052837734,0.22953987],"study_design_scores_gemma":[0.000072103336,0.00008928513,0.0002990191,0.00006271506,0.00002799046,0.00007644868,0.00009935449,0.9850305,0.002253828,0.0054509826,0.006515815,0.000022050042],"about_ca_topic_score_codex":0.0073301615,"about_ca_topic_score_gemma":0.010425956,"teacher_disagreement_score":0.011072953,"about_ca_system_score_codex":0.00095440156,"about_ca_system_score_gemma":0.0023814815,"threshold_uncertainty_score":0.037042737},"labels":[],"label_agreement":null},{"id":"W3042965572","doi":"10.1108/ecam-11-2019-0600","title":"The role of project management office in developing knowledge management infrastructure","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Upstream (networking); Business; Petroleum industry; Phase (matter); Knowledge management; Process management; Engineering management; Engineering; Computer science; Telecommunications","score_opus":0.021691872835161295,"score_gpt":0.2806626393875307,"score_spread":0.25897076655236945,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042965572","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77142626,0.0019809161,0.05016299,0.009300425,0.00021808443,0.0011646637,0.0001908011,0.0005916504,0.16496429],"genre_scores_gemma":[0.9797595,0.00063035404,0.014358345,0.00023759805,0.00004401691,0.00015569123,0.00007997478,0.000036788308,0.004697701],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98878235,0.005636942,0.0006981986,0.00078415696,0.0018189896,0.0022793512],"domain_scores_gemma":[0.96612483,0.011428864,0.0061014937,0.0026905874,0.005078133,0.008576018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011080354,0.00033408488,0.00019865263,0.002497861,0.0024148687,0.006408756,0.0012769179,0.00089676166,0.005323497],"category_scores_gemma":[0.023264002,0.00032831903,0.00023252516,0.0019198788,0.0019248431,0.0045070406,0.004969868,0.00112991,0.0013451959],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002341092,0.0010698442,0.16181356,0.0008318597,0.00006590639,0.0011257246,0.0190714,0.002336737,0.003870288,0.039302707,0.012166334,0.75811154],"study_design_scores_gemma":[0.0002202873,0.0028313422,0.41057643,0.0022482702,0.00019910069,0.002937052,0.100671045,0.0149213495,0.009070133,0.04022188,0.41585073,0.00025240437],"about_ca_topic_score_codex":0.0024375569,"about_ca_topic_score_gemma":0.0022750522,"teacher_disagreement_score":0.011080354,"about_ca_system_score_codex":0.0021250157,"about_ca_system_score_gemma":0.015721135,"threshold_uncertainty_score":0.058599234},"labels":[],"label_agreement":null},{"id":"W3045621045","doi":"10.1108/ecam-05-2020-0299","title":"Identifying enablers for coordination across construction supply chain processes: a systematic literature review","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Supply chain; Interdependence; Knowledge management; Process management; Computer science; Process (computing); Systematic review; Enabling; Stakeholder; Business","score_opus":0.039085118006271395,"score_gpt":0.3152694259803482,"score_spread":0.2761843079740768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045621045","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028337731,0.9904627,0.0019303499,0.001081454,0.00018993925,0.0014682898,0.0006026771,0.000025442712,0.0014053113],"genre_scores_gemma":[0.032174405,0.95741576,0.006018579,0.00082262215,0.0001134507,0.0025962696,0.000613197,0.000015757958,0.00022987298],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9729273,0.01034059,0.009294707,0.0017557387,0.00499776,0.0006839573],"domain_scores_gemma":[0.8688307,0.097084776,0.015566745,0.00257508,0.014891955,0.0010507016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.028628133,0.0019635332,0.0051788134,0.034775376,0.0018101974,0.0054816445,0.0022997798,0.0026643733,0.004028548],"category_scores_gemma":[0.10486319,0.0015632891,0.0063335146,0.023187935,0.0023246848,0.0065551884,0.0036744184,0.0021089572,0.0005090175],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007899741,0.000055535253,0.0016295384,0.8419608,0.0022075637,0.00033708147,0.0021001794,0.00034930295,0.00022869429,0.0028273934,0.0026186595,0.14560618],"study_design_scores_gemma":[0.000048473932,0.00010787909,0.0023919248,0.9497917,0.009203246,0.00043683304,0.0021626847,0.00015158257,0.00023222728,0.0012299254,0.034188353,0.000055106502],"about_ca_topic_score_codex":0.010136486,"about_ca_topic_score_gemma":0.025524292,"teacher_disagreement_score":0.034775376,"about_ca_system_score_codex":0.0070541,"about_ca_system_score_gemma":0.050099052,"threshold_uncertainty_score":0.15140182},"labels":[],"label_agreement":null},{"id":"W3070075040","doi":"10.1108/ecam-10-2019-0590","title":"Optimized crew selection for scheduling of repetitive projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Crew; Duration (music); Operations research; Crew scheduling; Float (project management); Computer science; Operations management; Scheduling (production processes); Engineering; Aeronautics; Systems engineering","score_opus":0.06415923892039745,"score_gpt":0.3106000499711349,"score_spread":0.24644081105073745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3070075040","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22524375,0.00036876366,0.76360923,0.00010191086,0.000032595974,0.00023071558,0.00016142557,0.000320506,0.009931133],"genre_scores_gemma":[0.91984564,0.00013095103,0.07604982,0.000023864903,0.000008381749,0.00015316969,0.00015212214,0.00006556896,0.0035704395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995017,0.00013590211,0.000014109061,0.00010370656,0.00014078505,0.000103790364],"domain_scores_gemma":[0.9996363,0.00011626333,0.000102559665,0.000037819078,0.00006705417,0.00003994571],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005400229,0.00065432454,0.00074080593,0.0007519281,0.0003519301,0.00079278613,0.0008750111,0.00052493723,0.0028399983],"category_scores_gemma":[0.0014375725,0.00042080984,0.0005435738,0.00052030594,0.00027205423,0.0006987046,0.00056433654,0.0005995744,0.00039295602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009634048,0.00005727866,0.0009305348,0.000059032725,0.000023387103,0.00005593457,0.00004418173,0.96598744,0.0035875004,0.0015569666,0.00030750758,0.027293867],"study_design_scores_gemma":[0.000012290475,0.00016003093,0.00093565683,0.000012029089,0.000010567534,0.000024917912,0.000041400523,0.99527293,0.0016462787,0.0011270172,0.00074816856,0.000008782961],"about_ca_topic_score_codex":0.006722407,"about_ca_topic_score_gemma":0.006615145,"teacher_disagreement_score":0.006722407,"about_ca_system_score_codex":0.0007202513,"about_ca_system_score_gemma":0.0013431847,"threshold_uncertainty_score":0.01336658},"labels":[],"label_agreement":null},{"id":"W3091273865","doi":"10.1108/ecam-05-2020-0296","title":"A qualitative approach to investigate emergency preparedness state for the built environment in the UAE","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Disaster Management and Resilience","field":"Social Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Preparedness; Documentation; Interview; Emergency management; Crisis management; Business; Content analysis; Public relations; Phase (matter); Political science; Process management; Computer science; Sociology","score_opus":0.04324240858889051,"score_gpt":0.3068025868429159,"score_spread":0.2635601782540254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3091273865","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8761071,0.0027677608,0.045238145,0.0114824865,0.00048349664,0.010157175,0.0017743264,0.0001236821,0.051865883],"genre_scores_gemma":[0.9524611,0.0015832818,0.025902161,0.0023551849,0.000040310468,0.009692137,0.00025158268,0.000037730224,0.007676469],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98349553,0.01355714,0.00039838723,0.00053122244,0.00095822156,0.0010595466],"domain_scores_gemma":[0.97272646,0.020616662,0.0013236743,0.0007564659,0.0033059353,0.001270783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017583834,0.00053951563,0.0007261203,0.0031343396,0.008253144,0.004390698,0.0018784112,0.0019706252,0.0046182466],"category_scores_gemma":[0.020175532,0.00044632173,0.00053621276,0.0030241378,0.008086819,0.0038299304,0.0053196936,0.0024943964,0.00053270586],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000577964,0.00012241927,0.0023753087,0.00097607536,0.000007673704,0.0012191422,0.96594906,0.000274102,0.0009953552,0.013813875,0.002097504,0.012111647],"study_design_scores_gemma":[0.000011442659,0.000083649444,0.0009463247,0.00075688865,0.000005576499,0.00021959977,0.9754929,0.00029040017,0.00047174195,0.0023585916,0.019347044,0.000015835732],"about_ca_topic_score_codex":0.0073171062,"about_ca_topic_score_gemma":0.011267662,"teacher_disagreement_score":0.017583834,"about_ca_system_score_codex":0.007991245,"about_ca_system_score_gemma":0.009776248,"threshold_uncertainty_score":0.09299332},"labels":[],"label_agreement":null},{"id":"W3108037149","doi":"10.1108/ecam-01-2020-0027","title":"An integrated BIM-based approach for cost estimation in construction projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Agile software development; Process (computing); Estimation; Building information modeling; Computer science; Systems engineering; Cost engineering; TRACE (psycholinguistics); Scheme (mathematics); Industrial engineering; Reliability engineering; Risk analysis (engineering); Engineering; Software engineering; Operations management","score_opus":0.011558966832562047,"score_gpt":0.2072388985586022,"score_spread":0.19567993172604015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108037149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0190926,0.00025296398,0.9672953,0.00018356912,0.000035420013,0.00029281795,0.00076978555,0.0014335519,0.010644037],"genre_scores_gemma":[0.27838224,0.0005122532,0.7157244,0.00006146326,0.00002378715,0.00066248083,0.0017021664,0.00019658454,0.0027345885],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99545336,0.0014555132,0.00030667672,0.0003747878,0.0022419656,0.0001676448],"domain_scores_gemma":[0.99748445,0.0006053863,0.00035193848,0.00037305287,0.0011083655,0.00007670767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026992399,0.0013431829,0.00086306204,0.0070561375,0.0006670643,0.0036076733,0.0017471128,0.00082967815,0.0035161884],"category_scores_gemma":[0.0069676256,0.0008227602,0.0010369637,0.005438267,0.000492192,0.0032081415,0.0024692628,0.000856706,0.0013046527],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011324158,0.00033356954,0.013784847,0.0006188773,0.0001811111,0.00033440228,0.00086622156,0.33515692,0.006068013,0.040734686,0.0072254734,0.5945826],"study_design_scores_gemma":[0.000019635065,0.00010198859,0.013765034,0.00022422997,0.00007343448,0.0003259333,0.000944595,0.9386917,0.004850193,0.016846905,0.024042638,0.00011373842],"about_ca_topic_score_codex":0.006935978,"about_ca_topic_score_gemma":0.008096096,"teacher_disagreement_score":0.0070561375,"about_ca_system_score_codex":0.0016475995,"about_ca_system_score_gemma":0.0020184172,"threshold_uncertainty_score":0.014275134},"labels":[],"label_agreement":null},{"id":"W3137485993","doi":"10.1108/ecam-11-2020-0919","title":"Thermal performance assessment of cool roofs on supermarkets through case analysis in 13 cities","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Roof; Air conditioning; Energy consumption; Architectural engineering; Environmental science; Environmental economics; Consumption (sociology); Green roof; Efficient energy use; Civil engineering; Business; Engineering; Mechanical engineering; Economics","score_opus":0.004897541253630504,"score_gpt":0.19859785075408648,"score_spread":0.19370030950045597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3137485993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9975515,0.00002790519,0.0009507257,0.000010114266,0.0000016802202,0.000031186566,0.00008553496,0.00000893625,0.0013324538],"genre_scores_gemma":[0.9981159,0.00006113777,0.00095595303,0.0000031432735,0.0000015785835,0.000022866963,0.00009651068,0.00000840611,0.0007346688],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9990282,0.00038307576,0.000028788472,0.000114514434,0.00018837524,0.00025697506],"domain_scores_gemma":[0.99919194,0.00043402766,0.000095668154,0.00009899326,0.00010929981,0.000070102134],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010210503,0.0007005829,0.00069896306,0.0011753141,0.0010139573,0.0018875737,0.0010522136,0.0009065455,0.0025888584],"category_scores_gemma":[0.0010490722,0.00051030196,0.0014753325,0.0015157294,0.001267274,0.0007778251,0.00071436906,0.0005244506,0.00023742103],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015436264,0.0019342458,0.141033,0.0005244439,0.0003985971,0.0076281293,0.0025029725,0.7980737,0.018369807,0.0033074243,0.001260353,0.023423754],"study_design_scores_gemma":[0.00018100347,0.002031719,0.2754474,0.000098698896,0.00043424926,0.0010001726,0.01933239,0.66810805,0.026486639,0.0020988293,0.004573352,0.00020752152],"about_ca_topic_score_codex":0.021672912,"about_ca_topic_score_gemma":0.03207356,"teacher_disagreement_score":0.021672912,"about_ca_system_score_codex":0.0025367567,"about_ca_system_score_gemma":0.0005735584,"threshold_uncertainty_score":0.043093503},"labels":[],"label_agreement":null},{"id":"W3149191354","doi":"10.1046/j.1365-232x.2001.00198.x","title":"Construction claims management: towards an agent-based approach","year":2001,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Auction Theory and Applications","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Engineering and Physical Sciences Research Council","keywords":"Computer science; Business; Process management","score_opus":0.03442545050934148,"score_gpt":0.29470781896006576,"score_spread":0.2602823684507243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3149191354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008983047,0.0018204604,0.96069145,0.005220696,0.0001399294,0.00026793842,0.000058584577,0.0002910758,0.02252683],"genre_scores_gemma":[0.34274516,0.0020771876,0.6449564,0.0006273446,0.00038188318,0.00042864168,0.00018714133,0.00007979443,0.008516497],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9946845,0.0027878953,0.00038084137,0.0005529857,0.0013609959,0.00023279367],"domain_scores_gemma":[0.9933733,0.003568961,0.0010012038,0.00045421786,0.0011714081,0.0004309795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008508177,0.00086463586,0.00086956006,0.0027927773,0.001688547,0.010098611,0.004568006,0.0038851758,0.0033107796],"category_scores_gemma":[0.008286518,0.0007266056,0.000964096,0.0018140138,0.0034262824,0.005416979,0.005875312,0.0033245415,0.0006459468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000926271,0.00034372765,0.002586838,0.00046380714,0.00016724985,0.0008836075,0.0029143565,0.20918182,0.002150569,0.62515855,0.007094615,0.14896227],"study_design_scores_gemma":[0.000035164234,0.00005065978,0.00042801155,0.00020125056,0.000050444567,0.00017967063,0.001069657,0.6500083,0.00072485313,0.31027642,0.0369296,0.000045957822],"about_ca_topic_score_codex":0.0031448533,"about_ca_topic_score_gemma":0.0024077776,"teacher_disagreement_score":0.010098611,"about_ca_system_score_codex":0.0025564097,"about_ca_system_score_gemma":0.00236318,"threshold_uncertainty_score":0.044996083},"labels":[],"label_agreement":null},{"id":"W3160008510","doi":"10.1108/ecam-11-2020-0986","title":"A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Context (archaeology); Lean construction; Procurement; Systems engineering; Engineering; Process management; Computer science; Modular design; Bidding; Construction engineering; Construction industry; Operations management; Business","score_opus":0.006971102520801377,"score_gpt":0.20443454892908347,"score_spread":0.1974634464082821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3160008510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010453044,0.0006557816,0.9688891,0.0010054904,0.000053187272,0.0006268191,0.0002912087,0.00038321156,0.017642196],"genre_scores_gemma":[0.16933538,0.0006680654,0.8269354,0.00011255213,0.000017385173,0.000593092,0.0004669269,0.000052337058,0.0018188484],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99401593,0.0030839886,0.00042836054,0.00046026072,0.0016973581,0.0003141248],"domain_scores_gemma":[0.99743205,0.00092762307,0.00041362474,0.00038896824,0.00067133247,0.00016637781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006889272,0.0013861788,0.00057806337,0.00581868,0.001475773,0.0051150564,0.0024763506,0.0013601617,0.0031285016],"category_scores_gemma":[0.0053332197,0.00061420817,0.0012450336,0.0043959497,0.0025452867,0.0040448722,0.0043738666,0.0015655004,0.00065981236],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008173505,0.00039216178,0.005444002,0.00077201874,0.000064286316,0.00044725375,0.00207241,0.23005474,0.0030931784,0.5545095,0.003089832,0.19997881],"study_design_scores_gemma":[0.000051853753,0.00036374707,0.0058880486,0.0018660534,0.000115648254,0.00064168294,0.004896417,0.5237022,0.008267586,0.33044958,0.123585664,0.00017154771],"about_ca_topic_score_codex":0.00929457,"about_ca_topic_score_gemma":0.013147879,"teacher_disagreement_score":0.00929457,"about_ca_system_score_codex":0.005008378,"about_ca_system_score_gemma":0.00782458,"threshold_uncertainty_score":0.036434352},"labels":[],"label_agreement":null},{"id":"W3167143037","doi":"10.1108/ecam-12-2020-1019","title":"Optimized resource-constrained method for project schedule compression","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematical optimization; Schedule; Genetic algorithm; Scheduling (production processes); Python (programming language); Metaheuristic; Fuzzy logic; Algorithm; Mathematics; Artificial intelligence","score_opus":0.04989989109981235,"score_gpt":0.35927779783123515,"score_spread":0.3093779067314228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167143037","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006686553,0.00018052642,0.9886573,0.000050711526,0.000028730377,0.000082339,0.000111179965,0.0002649809,0.003937723],"genre_scores_gemma":[0.27323306,0.00040336128,0.7204851,0.00006966882,0.0000460989,0.00048235754,0.00050845806,0.00025083803,0.004521095],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99942446,0.00014074826,0.000033069027,0.00010352562,0.00024807686,0.000050117327],"domain_scores_gemma":[0.99944085,0.00027445605,0.00007764064,0.00004179955,0.0001467117,0.000018519839],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085326197,0.00081340346,0.00065777777,0.0015255263,0.00036620675,0.0007971378,0.000969315,0.0005061788,0.0060325814],"category_scores_gemma":[0.002473962,0.00035907413,0.0006952487,0.0014390867,0.00028943532,0.00064878276,0.00059937703,0.0006208,0.0006205903],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066447144,0.000040119117,0.00040887794,0.00016951181,0.000031731783,0.0000692235,0.00005151834,0.8512949,0.002245232,0.009061588,0.0014613214,0.13509957],"study_design_scores_gemma":[0.0000066722714,0.000018236688,0.00014391512,0.000017712035,0.000007663773,0.000023692033,0.000011709621,0.99539196,0.0009883405,0.0018983332,0.001486165,0.0000056473887],"about_ca_topic_score_codex":0.0060180086,"about_ca_topic_score_gemma":0.004607302,"teacher_disagreement_score":0.0060325814,"about_ca_system_score_codex":0.0007676145,"about_ca_system_score_gemma":0.0016778207,"threshold_uncertainty_score":0.020181},"labels":[],"label_agreement":null},{"id":"W3167790180","doi":"10.1108/ecam-12-2020-1060","title":"Mixed qualitative–quantitative approach for bidding decisions in construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; Quantitative analysis (chemistry); Decision support system; Reuse; Qualitative property; Operations research; Management science; Knowledge management; Data mining; Machine learning; Business; Engineering; Marketing","score_opus":0.02858960551835073,"score_gpt":0.2619158157200169,"score_spread":0.23332621020166613,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167790180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020093078,0.00025184103,0.9657578,0.00047360998,0.00004258236,0.00041970547,0.00012769063,0.000099215744,0.0127344895],"genre_scores_gemma":[0.4612977,0.00024412012,0.5349624,0.00015460586,0.000026262587,0.0007227738,0.000111632115,0.000039012164,0.0024414575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9850675,0.010762229,0.0005423906,0.0007085673,0.0026331502,0.00028625363],"domain_scores_gemma":[0.9831907,0.01207778,0.0013095337,0.0006618374,0.0023517753,0.00040832546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012613513,0.0011777394,0.0007897689,0.0034270575,0.0010827462,0.004183509,0.0021036253,0.0010645868,0.0052434406],"category_scores_gemma":[0.020692758,0.0007124063,0.0013172997,0.0022436355,0.0018604004,0.0029473451,0.0024046758,0.0014557823,0.0005927351],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004198886,0.00061403203,0.011732491,0.0013246243,0.0004629431,0.0010408494,0.0065071178,0.38467225,0.0064587737,0.36902094,0.0026471613,0.21509895],"study_design_scores_gemma":[0.00004714835,0.00027019446,0.0021385294,0.0002323992,0.00011051038,0.00027276456,0.002880037,0.8189739,0.0017769937,0.1644198,0.008760138,0.00011756747],"about_ca_topic_score_codex":0.0045341123,"about_ca_topic_score_gemma":0.007238912,"teacher_disagreement_score":0.012613513,"about_ca_system_score_codex":0.0036669613,"about_ca_system_score_gemma":0.0038060648,"threshold_uncertainty_score":0.06670749},"labels":[],"label_agreement":null},{"id":"W3168304808","doi":"10.1108/ecam-10-2020-0810","title":"Formalizing knowledge representation in earthwork operations through development of domain ontology","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Earthworks; Computer science; Context (archaeology); Domain (mathematical analysis); Interoperability; Software engineering; Engineering; World Wide Web; Mathematics","score_opus":0.010687857085148515,"score_gpt":0.22995428899990153,"score_spread":0.219266431914753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3168304808","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006860312,0.00042944902,0.97522426,0.0014364979,0.00007683951,0.00034642222,0.00036053074,0.00034366277,0.014922088],"genre_scores_gemma":[0.116499625,0.0010410058,0.8768278,0.00032812761,0.000046558504,0.0005609013,0.0015068644,0.00009916693,0.0030899793],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99392116,0.0027224608,0.00093369564,0.00077190687,0.0012653182,0.00038556292],"domain_scores_gemma":[0.9946307,0.0025533827,0.0006176323,0.0012504596,0.0007642984,0.000183569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008011596,0.00073995715,0.00063773344,0.0048712087,0.0021158264,0.007447988,0.0025499493,0.0014291554,0.002288305],"category_scores_gemma":[0.00930555,0.0006131784,0.0019522439,0.004522005,0.0048469063,0.012318869,0.005336532,0.002950686,0.0005081972],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017115333,0.00006208327,0.0009091646,0.00030058308,0.000039043676,0.00041086052,0.0034883684,0.012045165,0.0012639232,0.9328982,0.001899673,0.04666574],"study_design_scores_gemma":[0.000037204998,0.000049515376,0.0011776163,0.0016152863,0.00009939716,0.0006976387,0.007097649,0.08368755,0.0040056542,0.69940716,0.20204017,0.00008527899],"about_ca_topic_score_codex":0.016769223,"about_ca_topic_score_gemma":0.012113509,"teacher_disagreement_score":0.016769223,"about_ca_system_score_codex":0.0028672596,"about_ca_system_score_gemma":0.007277441,"threshold_uncertainty_score":0.042369843},"labels":[],"label_agreement":null},{"id":"W3196867374","doi":"10.1108/ecam-02-2021-0145","title":"An empirical study on non-physical waste factors in the construction industry","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ranking (information retrieval); Sample (material); Empirical research; Quality (philosophy); Population; Process management; Index (typography); Operations management; Performance indicator; Engineering; Computer science; Business; Marketing; Statistics; Mathematics","score_opus":0.046256057683937125,"score_gpt":0.35467661561246616,"score_spread":0.308420557928529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196867374","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9844284,0.0014812679,0.0021731602,0.00042043926,0.000013354207,0.00021851453,0.00017526883,0.0000054679317,0.011083969],"genre_scores_gemma":[0.99542725,0.001963815,0.0015332125,0.00008459205,0.000008373751,0.00010423374,0.00009013704,0.0000044195044,0.0007838976],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99325716,0.00317234,0.0006770669,0.0003638273,0.001959814,0.000569817],"domain_scores_gemma":[0.9380001,0.044624843,0.008631327,0.001309343,0.0066091013,0.00082524435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007746357,0.00039932365,0.0004612795,0.004245301,0.0015993919,0.0029710452,0.0005625785,0.00058706297,0.003984086],"category_scores_gemma":[0.02660428,0.00035461818,0.00036205625,0.00830474,0.002604499,0.0027066784,0.001299425,0.0006913949,0.0003263032],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002239574,0.0013369416,0.71162635,0.005277797,0.00012363691,0.002070375,0.12028005,0.0019330232,0.0016696549,0.010928723,0.00138708,0.14314239],"study_design_scores_gemma":[0.000015169829,0.0006097985,0.5039453,0.0031201972,0.00008305134,0.0007957148,0.46368933,0.0013142888,0.001734891,0.0017353303,0.022910275,0.000046639947],"about_ca_topic_score_codex":0.0064755017,"about_ca_topic_score_gemma":0.012578888,"teacher_disagreement_score":0.007746357,"about_ca_system_score_codex":0.0024914392,"about_ca_system_score_gemma":0.005864802,"threshold_uncertainty_score":0.040967107},"labels":[],"label_agreement":null},{"id":"W3197910768","doi":"10.1108/ecam-11-2020-0955","title":"Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Product Development and Customization","field":"Business, Management and Accounting","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Mass customization; Personalization; Computer science; Lean manufacturing; Production (economics); Manufacturing engineering; Process management; Information system; Systems engineering; Knowledge management; Engineering","score_opus":0.007329919546447088,"score_gpt":0.21552252709958733,"score_spread":0.20819260755314023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197910768","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18154502,0.00034288404,0.7953951,0.00033081506,0.000027646958,0.0006036955,0.000053252093,0.0007010682,0.021000521],"genre_scores_gemma":[0.55195236,0.00035147328,0.4448089,0.00004230387,0.0000051523734,0.00031705218,0.00005707138,0.00005663016,0.0024091266],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99823844,0.0009525197,0.000083432664,0.00016702492,0.000473284,0.00008528838],"domain_scores_gemma":[0.9985728,0.00094824913,0.0001340534,0.00014482871,0.00016072961,0.000039386756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019549867,0.00064636744,0.0002979292,0.0016810282,0.0005496337,0.0016948057,0.00089681114,0.00045367086,0.0026399272],"category_scores_gemma":[0.0029598244,0.0003542798,0.00064157107,0.0011595682,0.00075802434,0.0015724405,0.0011357263,0.00051323907,0.00024811202],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037626896,0.0014286496,0.010113842,0.0013098504,0.00010292941,0.0007798541,0.018622126,0.06410313,0.03692191,0.06883659,0.001992243,0.7954126],"study_design_scores_gemma":[0.0002488579,0.002439995,0.019194748,0.0010371917,0.0005170541,0.0015564044,0.023567898,0.757787,0.09167567,0.042833216,0.05883198,0.000309962],"about_ca_topic_score_codex":0.0019571502,"about_ca_topic_score_gemma":0.0026900724,"teacher_disagreement_score":0.0026399272,"about_ca_system_score_codex":0.0010344445,"about_ca_system_score_gemma":0.0014930136,"threshold_uncertainty_score":0.010339081},"labels":[],"label_agreement":null},{"id":"W4200410565","doi":"10.1108/ecam-02-2021-0133","title":"Creating space and time for innovation - a methodology for building adaptation design appraisal using physics-based simulation tools and interactive multi-objective optimization","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Adaptation (eye); Building design; Systems engineering; Computer science; Decision support system; Management science; Engineering; Architectural engineering","score_opus":0.05284153874273201,"score_gpt":0.296629106780695,"score_spread":0.24378756803796298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200410565","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014336652,0.00010650966,0.99112296,0.00021330605,0.000030290388,0.00031140653,0.00007391068,0.0001972117,0.0065106745],"genre_scores_gemma":[0.03460628,0.00019648399,0.9622922,0.00004354698,0.000012923708,0.0013741533,0.00009846801,0.00009377906,0.0012822377],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9950127,0.0029912428,0.00022697178,0.0003766687,0.0012350539,0.00015732899],"domain_scores_gemma":[0.994666,0.0035228133,0.00039500056,0.0005922907,0.0006567963,0.00016716398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010511976,0.0020522627,0.0011963624,0.003944449,0.00150577,0.004427352,0.0028379168,0.0015170339,0.010463783],"category_scores_gemma":[0.009647529,0.0010327072,0.0032300088,0.0023089184,0.0029904225,0.0026551725,0.0045570005,0.0026915427,0.0010792033],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004515586,0.00008892644,0.0009075299,0.0006255477,0.00014589076,0.00016336996,0.0007274547,0.49057898,0.0016739591,0.4210158,0.002441729,0.08158574],"study_design_scores_gemma":[0.00007029499,0.00014766991,0.00041120753,0.000514178,0.00008579847,0.00009390374,0.00050323654,0.6478399,0.0019261681,0.302719,0.045610566,0.000078084275],"about_ca_topic_score_codex":0.0030947058,"about_ca_topic_score_gemma":0.0042858287,"teacher_disagreement_score":0.010511976,"about_ca_system_score_codex":0.002894801,"about_ca_system_score_gemma":0.005026482,"threshold_uncertainty_score":0.05559331},"labels":[],"label_agreement":null},{"id":"W4206176960","doi":"10.1108/ecam-03-2021-0195","title":"Application framework for safety-centric construction acceleration planning","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; University of Alberta","funders":"","keywords":"Schedule; Context (archaeology); Acceleration; Factoring; Project planning; Operations research; Transport engineering; Risk analysis (engineering); Engineering; Computer science; Project management; Systems engineering; Business; Geography","score_opus":0.030315252124951675,"score_gpt":0.3771777691329518,"score_spread":0.34686251700800014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206176960","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035575256,0.00016341949,0.98560923,0.00027564116,0.00003092266,0.00035522893,0.00023252012,0.0019221129,0.007853293],"genre_scores_gemma":[0.09053908,0.00038100037,0.9047276,0.00008553942,0.000030610427,0.0006043749,0.0005614527,0.00017877166,0.0028915363],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99834704,0.0006285336,0.00014608158,0.00026677325,0.00048292763,0.00012870795],"domain_scores_gemma":[0.9986191,0.0006235752,0.00011949088,0.00019997545,0.00033365958,0.00010417519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023238258,0.0011596439,0.0006675864,0.0019780085,0.00076307775,0.0022170837,0.0024031035,0.0012963446,0.0076540005],"category_scores_gemma":[0.0043953964,0.0005704845,0.0015598305,0.0017118605,0.0010221082,0.00136192,0.0022367374,0.0012403422,0.0013444327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012703639,0.00022583838,0.004104359,0.00074135757,0.00009826221,0.0010989005,0.0008858683,0.53925174,0.0053571127,0.26275358,0.008214404,0.1771415],"study_design_scores_gemma":[0.000030430909,0.00008578919,0.00059544446,0.00018587579,0.000038967333,0.00030201135,0.00021481553,0.8818604,0.0019675049,0.06715095,0.047533587,0.000034194458],"about_ca_topic_score_codex":0.010481606,"about_ca_topic_score_gemma":0.009849633,"teacher_disagreement_score":0.010481606,"about_ca_system_score_codex":0.0016973208,"about_ca_system_score_gemma":0.0030849557,"threshold_uncertainty_score":0.025605202},"labels":[],"label_agreement":null},{"id":"W4210545694","doi":"10.1108/ecam-02-2021-0177","title":"A multiproject scheduling and resource management model in projects construction","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Profit (economics); Scheduling (production processes); Exploit; Computer science; Multimodal transport; Operations research; Project management; Transport engineering; Operations management; Engineering; Systems engineering; Computer security","score_opus":0.009417982647277704,"score_gpt":0.21047230024238253,"score_spread":0.20105431759510484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210545694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11478188,0.00042881776,0.86445534,0.00084542,0.000096251526,0.0003413539,0.00054372574,0.0003458279,0.018161483],"genre_scores_gemma":[0.86384314,0.00052287383,0.11887213,0.00006896713,0.00004533966,0.0005990075,0.00033671653,0.00007734434,0.015634578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883956,0.00051597395,0.00004778117,0.00022630826,0.00017178131,0.00019859974],"domain_scores_gemma":[0.9993759,0.00023626014,0.0001004252,0.0000438629,0.00012613524,0.00011748938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016927521,0.00069464865,0.0008202845,0.0007383177,0.0008543216,0.0020530783,0.0017914539,0.0011916409,0.0063020317],"category_scores_gemma":[0.0013968493,0.00067976676,0.0011302658,0.0011853735,0.00071184436,0.001621106,0.0012012973,0.0011173004,0.0005280023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005400223,0.00005971281,0.00080222497,0.00004901584,0.00001941327,0.00011303393,0.00006215957,0.97726506,0.0004372352,0.013974664,0.00050586363,0.0066576595],"study_design_scores_gemma":[0.000012501566,0.00005242896,0.00021944185,0.0000062499394,0.000007965714,0.000018293962,0.000042861557,0.99486536,0.00011462737,0.0037234083,0.0009299386,0.0000068622917],"about_ca_topic_score_codex":0.015099417,"about_ca_topic_score_gemma":0.010990451,"teacher_disagreement_score":0.015099417,"about_ca_system_score_codex":0.0021256346,"about_ca_system_score_gemma":0.0034507676,"threshold_uncertainty_score":0.030023038},"labels":[],"label_agreement":null},{"id":"W4244522544","doi":"10.1046/j.1365-232x.2002.00242.x","title":"Risk management trends in the construction industry: moving towards joint risk management","year":2002,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Joint (building); Risk management; Business; Risk analysis (engineering); Operations management; Engineering; Finance; Civil engineering","score_opus":0.03564944935920262,"score_gpt":0.27098897647112313,"score_spread":0.23533952711192052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244522544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9967715,0.00016391173,0.00038929068,0.0007071815,0.0000054313423,0.0000139466,0.000016554843,0.0000037099342,0.0019282437],"genre_scores_gemma":[0.99917233,0.00013422807,0.00028300117,0.00006686957,0.00000789298,0.000006811471,0.000020556978,0.0000011228027,0.00030724498],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99571615,0.0015494238,0.00039049605,0.00033267695,0.0015259057,0.00048536554],"domain_scores_gemma":[0.9755376,0.0057487697,0.009670111,0.0007520572,0.0068126908,0.0014787785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008347644,0.0001532574,0.0002204144,0.0016293073,0.0011815442,0.0034208,0.0006211912,0.00071528804,0.0014361631],"category_scores_gemma":[0.013664031,0.00020904688,0.00018996051,0.001891699,0.0014173298,0.002375268,0.0016947963,0.0011922488,0.00016868701],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015202262,0.00022670365,0.8316993,0.0002820283,0.00002939119,0.00031031622,0.10596541,0.000577364,0.0026978396,0.003016531,0.0007894532,0.054253552],"study_design_scores_gemma":[0.0000063099183,0.00028808208,0.8500822,0.00010138757,0.000009729443,0.00022071794,0.13941732,0.0009888774,0.0006519797,0.0005138786,0.007685595,0.000033953846],"about_ca_topic_score_codex":0.024396801,"about_ca_topic_score_gemma":0.025456764,"teacher_disagreement_score":0.024396801,"about_ca_system_score_codex":0.003291523,"about_ca_system_score_gemma":0.0027337954,"threshold_uncertainty_score":0.048509598},"labels":[],"label_agreement":null},{"id":"W4282564378","doi":"10.1108/ecam-02-2022-0170","title":"The latest operational, contractual and organizational trends in IPD literature: review and future directions","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Thematic analysis; Systematic review; Domain (mathematical analysis); Knowledge management; Management science; Computer science; Data science; Political science; Qualitative research; Engineering; Sociology; Social science; Geography; MEDLINE","score_opus":0.002117895599477319,"score_gpt":0.17350870817634415,"score_spread":0.17139081257686684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4282564378","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00074636727,0.99598396,0.00037363553,0.0018392309,0.00028555,0.000025973166,0.00006331824,0.0000073480815,0.00067452877],"genre_scores_gemma":[0.006330235,0.9915039,0.00089498557,0.00073405926,0.00025888672,0.00006910756,0.00007913812,0.0000055895325,0.00012400997],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99085,0.002871148,0.0027537586,0.0010132443,0.0021374421,0.0003744231],"domain_scores_gemma":[0.89811105,0.083106235,0.006982751,0.001284278,0.009733294,0.00078229734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014701437,0.0008863785,0.002217586,0.020100594,0.0012827299,0.0060604103,0.001737906,0.0027015551,0.0038972597],"category_scores_gemma":[0.04611504,0.0008217832,0.002488283,0.024266893,0.0024583053,0.0077257683,0.002283772,0.0023983526,0.000654375],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121530524,0.00007967278,0.0025652635,0.34170684,0.0005370633,0.0003851275,0.0038652928,0.0004260762,0.00047181814,0.012124338,0.011911765,0.62580526],"study_design_scores_gemma":[0.000030526237,0.00015580551,0.008347881,0.6144457,0.0031694002,0.0015922108,0.00944779,0.00044148305,0.000570876,0.008122258,0.35356975,0.00010637849],"about_ca_topic_score_codex":0.007786952,"about_ca_topic_score_gemma":0.014549539,"teacher_disagreement_score":0.020100594,"about_ca_system_score_codex":0.0055699036,"about_ca_system_score_gemma":0.021603668,"threshold_uncertainty_score":0.07774961},"labels":[],"label_agreement":null},{"id":"W4296351251","doi":"10.1108/ecam-01-2022-0009","title":"The concept of integration in an IPD context: a grounded theory review","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Context (archaeology); Originality; Construct (python library); Grounded theory; Conceptual blending; Dimension (graph theory); Computer science; Conceptual framework; Process management; Knowledge management; Management science; Engineering; Qualitative research; Psychology; Sociology; Cognition","score_opus":0.02766794428007901,"score_gpt":0.30285861371382927,"score_spread":0.27519066943375026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296351251","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028950322,0.6751655,0.17316502,0.046957858,0.001960095,0.0036302612,0.0009026525,0.00014277283,0.06912566],"genre_scores_gemma":[0.3014219,0.5178072,0.16616572,0.0073506143,0.0004592058,0.004019198,0.0009249525,0.00010880217,0.0017424724],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9802421,0.012450718,0.0017531213,0.0010828183,0.003918751,0.00055250566],"domain_scores_gemma":[0.9462128,0.04703262,0.0013001736,0.0012948799,0.0036647262,0.00049480784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03153312,0.0012754531,0.0018902933,0.016371373,0.0035044225,0.010931996,0.004158062,0.0031985557,0.0025597517],"category_scores_gemma":[0.032166433,0.000889448,0.0013543409,0.01581666,0.012662929,0.011370839,0.005739801,0.0047641173,0.0005285844],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063586725,0.0002106815,0.0022605325,0.024224762,0.00012743175,0.0007100411,0.047836654,0.0017845435,0.00072172144,0.4834417,0.0072254166,0.4313929],"study_design_scores_gemma":[0.00006025486,0.00020106361,0.0044734976,0.1723684,0.00032791038,0.0011300637,0.10924407,0.0046748314,0.0015705646,0.32898155,0.37678823,0.00017955116],"about_ca_topic_score_codex":0.009112435,"about_ca_topic_score_gemma":0.007432498,"teacher_disagreement_score":0.03153312,"about_ca_system_score_codex":0.016405603,"about_ca_system_score_gemma":0.02396219,"threshold_uncertainty_score":0.1667651},"labels":[],"label_agreement":null},{"id":"W4306175755","doi":"10.1108/ecam-05-2022-0476","title":"Pose estimation method for construction machine based on improved AlphaPose model","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pose; Normalization (sociology); Computer science; Artificial intelligence; Machine learning; Machine vision; Software; Data mining","score_opus":0.025450896345358864,"score_gpt":0.3842897708824968,"score_spread":0.3588388745371379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4306175755","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028003056,0.00047627566,0.96675414,0.00013759882,0.000113202004,0.00006823091,0.000438342,0.0016476011,0.0023615004],"genre_scores_gemma":[0.76855594,0.0013045397,0.20984901,0.00032484854,0.00014653247,0.0002669467,0.0036083648,0.0003189366,0.015625011],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943405,0.000059178594,0.000020844924,0.00023446829,0.0001911345,0.000060287457],"domain_scores_gemma":[0.99964476,0.00006937278,0.00004934852,0.00006456358,0.00014446261,0.0000275153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045610828,0.001220193,0.00072490796,0.0010416777,0.0003073206,0.00081437477,0.0011442063,0.00077022746,0.004010975],"category_scores_gemma":[0.0013865331,0.00042864706,0.0013014954,0.0006338457,0.00047244332,0.0008768402,0.0009110603,0.0010129923,0.0019851895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030244855,0.00012023643,0.008978594,0.00018229711,0.00011944863,0.00024486068,0.00013357407,0.36964127,0.026116567,0.0030520128,0.005489501,0.5856192],"study_design_scores_gemma":[0.000008375549,0.00010100959,0.0053620776,0.000021117345,0.000028428529,0.00021534988,0.000032034768,0.98129576,0.007953187,0.0014983811,0.0034609186,0.000023342245],"about_ca_topic_score_codex":0.008100777,"about_ca_topic_score_gemma":0.009084471,"teacher_disagreement_score":0.008100777,"about_ca_system_score_codex":0.0004996186,"about_ca_system_score_gemma":0.0007935158,"threshold_uncertainty_score":0.016107261},"labels":[],"label_agreement":null},{"id":"W4311112516","doi":"10.1108/ecam-02-2022-0138","title":"Moving toward sustainability and circularity in hill road construction: a study of barriers, practices and performance","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Chicoutimi","funders":"","keywords":"Sustainability; Originality; Social sustainability; Resource (disambiguation); Business; Extant taxon; Sustainability organizations; Structural equation modeling; Environmental resource management; Environmental economics; Environmental planning; Economics; Sociology; Qualitative research; Geography; Social science; Computer science; Ecology","score_opus":0.006529368415366899,"score_gpt":0.21636758679368442,"score_spread":0.20983821837831754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311112516","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972554,0.00009794944,0.00036592048,0.00017887041,0.000002383805,0.000022031618,0.000004297414,0.000002438002,0.002070844],"genre_scores_gemma":[0.99911445,0.000079265985,0.00036917784,0.000016687689,0.0000014779024,0.000012563333,0.0000065970285,0.0000016011467,0.0003981903],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99571204,0.0024456077,0.00019042708,0.00027704175,0.0008127558,0.00056224654],"domain_scores_gemma":[0.9748174,0.010927477,0.008267583,0.0011443447,0.002283125,0.002560059],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050356667,0.00016550484,0.00023501547,0.001205356,0.002188111,0.0025462264,0.00066450116,0.0005990675,0.0027287211],"category_scores_gemma":[0.019692158,0.00022979178,0.00018967419,0.0014708535,0.005325932,0.0016156819,0.0032911457,0.0009355106,0.00021983261],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016400666,0.0009440057,0.70997804,0.000493767,0.00006008811,0.00053507095,0.20651923,0.0015019922,0.0020360567,0.010658076,0.00060792785,0.066501714],"study_design_scores_gemma":[0.000009193958,0.0003335848,0.65877974,0.00029226756,0.000026583135,0.00024348166,0.32815167,0.0014710523,0.0007205604,0.0022256938,0.0077000964,0.00004602805],"about_ca_topic_score_codex":0.023771843,"about_ca_topic_score_gemma":0.040820092,"teacher_disagreement_score":0.023771843,"about_ca_system_score_codex":0.0033651714,"about_ca_system_score_gemma":0.007118479,"threshold_uncertainty_score":0.04726696},"labels":[],"label_agreement":null},{"id":"W4320186808","doi":"10.1108/ecam-10-2022-0941","title":"A supply chain perspective of prefabricated housebuilding diffusion in New Zealand","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Supply chain; Context (archaeology); Originality; Business; Marketing; Perspective (graphical); Stakeholder; Industrial organization; Sustainability; Perception; Exploratory research; Qualitative research; Economics; Management; Psychology; Sociology; Computer science","score_opus":0.02427958436359527,"score_gpt":0.2879980251642769,"score_spread":0.26371844080068163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320186808","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7460587,0.0026001625,0.024532465,0.00931257,0.00007006693,0.0003744743,0.00023051578,0.000032165368,0.21678886],"genre_scores_gemma":[0.99026394,0.0012104389,0.0024002811,0.00009616197,0.000007348744,0.000041801402,0.000035924062,0.0000063440402,0.005937887],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9986835,0.00048381425,0.00008622253,0.0001700818,0.00033863407,0.00023781366],"domain_scores_gemma":[0.99751425,0.0010297662,0.00053343177,0.000092596434,0.0006094614,0.00022051726],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001969819,0.00029699897,0.00021762948,0.0014781092,0.003019449,0.0056523806,0.0006531859,0.0009781334,0.010209387],"category_scores_gemma":[0.0038154437,0.00030801282,0.0002851303,0.0027170624,0.004176326,0.005662254,0.0026618734,0.001133845,0.00028080094],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019098073,0.00020711418,0.0813876,0.0016452959,0.000057266254,0.01602962,0.37625238,0.007772224,0.011485039,0.41443902,0.0028249926,0.08770845],"study_design_scores_gemma":[0.000042692533,0.00028602924,0.087859035,0.0016830427,0.000085944805,0.0024296376,0.61644226,0.015241573,0.0027003584,0.0737822,0.19933291,0.00011432123],"about_ca_topic_score_codex":0.24412131,"about_ca_topic_score_gemma":0.1683906,"teacher_disagreement_score":0.24412131,"about_ca_system_score_codex":0.012779157,"about_ca_system_score_gemma":0.008404282,"threshold_uncertainty_score":0.48540074},"labels":[],"label_agreement":null},{"id":"W4365814559","doi":"10.1108/ecam-07-2022-0674","title":"Formalizing the information requirements for decision-making of field managers during indoor construction activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Computer science; Decision support system; Field (mathematics); Quality (philosophy); Work (physics); Task (project management); Originality; Information system; Statement of work; Knowledge management; Information quality; Business decision mapping; Process management; Risk analysis (engineering); Management science; Systems engineering; Engineering; Business; Qualitative research","score_opus":0.005332218608330148,"score_gpt":0.21170978703372964,"score_spread":0.2063775684253995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365814559","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41831163,0.0005945051,0.52306455,0.004674179,0.00012853544,0.0035424663,0.00051932636,0.00050402235,0.048660778],"genre_scores_gemma":[0.71675676,0.00025443445,0.27959925,0.00020300309,0.000022872198,0.0013327459,0.00035802985,0.000052654817,0.0014201942],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9758306,0.016747586,0.0020266173,0.0010777396,0.0030297716,0.0012876388],"domain_scores_gemma":[0.92102337,0.06288349,0.005537373,0.0042821798,0.0054156915,0.00085783284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021933688,0.0009915394,0.00041118,0.002249682,0.002517374,0.0065654125,0.0012913794,0.0013340743,0.004303603],"category_scores_gemma":[0.056419116,0.00080067775,0.0009981286,0.0011258068,0.0031062828,0.0050250604,0.0029466292,0.0018773424,0.000580587],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006908435,0.0012874999,0.032299947,0.0036393353,0.00013650775,0.0021521375,0.17043412,0.06774412,0.033338856,0.3660789,0.0058770496,0.31632072],"study_design_scores_gemma":[0.00034008114,0.0014617105,0.03891846,0.007591834,0.00037495108,0.0020324872,0.21818188,0.23155457,0.03931345,0.3109016,0.14883532,0.00049365655],"about_ca_topic_score_codex":0.0044600535,"about_ca_topic_score_gemma":0.005848766,"teacher_disagreement_score":0.021933688,"about_ca_system_score_codex":0.004627442,"about_ca_system_score_gemma":0.009905633,"threshold_uncertainty_score":0.11599785},"labels":[],"label_agreement":null},{"id":"W4377239071","doi":"10.1108/ecam-11-2022-1036","title":"A real options-based investment-income valuation model for old community renewal projects in China","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Capital Investment and Risk Analysis","field":"Economics, Econometrics and Finance","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Valuation (finance); Net present value; Capital budgeting; Government (linguistics); Economics; Business; Finance; Microeconomics; Debt","score_opus":0.03811778677951144,"score_gpt":0.23549258536055323,"score_spread":0.1973747985810418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4377239071","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29817787,0.0017357175,0.6378785,0.0018809293,0.00015136013,0.00037069144,0.0009312803,0.00025183626,0.058621787],"genre_scores_gemma":[0.97680193,0.00051497726,0.01071888,0.00004297241,0.000021247948,0.00024282574,0.00019247238,0.000026351334,0.011438407],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992362,0.00027189366,0.00003894762,0.00014809058,0.00013263708,0.00017228752],"domain_scores_gemma":[0.999479,0.00021410015,0.00007855884,0.000021030686,0.00014843486,0.00005896919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014549972,0.0010630803,0.000986176,0.0012439792,0.0007800466,0.0026236798,0.0025378934,0.0019214017,0.0048269723],"category_scores_gemma":[0.001922501,0.00062376866,0.0013412418,0.0012910425,0.0009345725,0.0021661473,0.0012159061,0.0011217748,0.0002800096],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019395502,0.000020485892,0.0010480826,0.000040578507,0.000014552365,0.0001927729,0.00006808868,0.9763175,0.0002334288,0.016868245,0.00048181255,0.004695105],"study_design_scores_gemma":[0.000005876542,0.000010303832,0.00027854313,0.000010541493,0.000008329461,0.000019677034,0.000035789988,0.9943904,0.000041889693,0.0047362,0.00045289152,0.000009552689],"about_ca_topic_score_codex":0.034670316,"about_ca_topic_score_gemma":0.01776842,"teacher_disagreement_score":0.034670316,"about_ca_system_score_codex":0.003947521,"about_ca_system_score_gemma":0.0031041147,"threshold_uncertainty_score":0.06893706},"labels":[],"label_agreement":null},{"id":"W4380372743","doi":"10.1108/ecam-12-2022-1121","title":"Schedule compression and emerging waste in construction: an assessment of overlapping activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Compression (physics); Computer science; Operations management; Engineering","score_opus":0.006656517620452095,"score_gpt":0.2399072260888694,"score_spread":0.2332507084684173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380372743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9531199,0.00028594912,0.042489544,0.00009953434,0.000010826242,0.00014389538,0.00011316828,0.000056567602,0.003680789],"genre_scores_gemma":[0.9873645,0.0001409625,0.01195665,0.000007034366,0.0000021674057,0.000044427325,0.00005850369,0.000013777467,0.00041210902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9977729,0.0008844022,0.00010824978,0.00013584015,0.00095090666,0.00014762813],"domain_scores_gemma":[0.9875114,0.0076745567,0.002408849,0.0006521183,0.0015139903,0.00023915795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029072284,0.00044698638,0.00033347518,0.0015211471,0.00051099673,0.0012317308,0.0006295558,0.0004362558,0.001744242],"category_scores_gemma":[0.01083873,0.00030426847,0.0005766194,0.0015751543,0.0009117802,0.0010407561,0.0009738263,0.0005296877,0.00010232151],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067730865,0.0003143455,0.11266654,0.00043279267,0.00014207333,0.00062782766,0.0010717402,0.7689849,0.0068324646,0.010938033,0.0003674083,0.096944556],"study_design_scores_gemma":[0.000057010573,0.00311725,0.09625279,0.00023814403,0.00027697708,0.00055006956,0.003371567,0.8602245,0.017348897,0.014200359,0.0042687836,0.00009374452],"about_ca_topic_score_codex":0.00526422,"about_ca_topic_score_gemma":0.0076838876,"teacher_disagreement_score":0.00526422,"about_ca_system_score_codex":0.0019734935,"about_ca_system_score_gemma":0.0016669957,"threshold_uncertainty_score":0.015375078},"labels":[],"label_agreement":null},{"id":"W4385723933","doi":"10.1108/ecam-05-2022-0394","title":"Facilitating the building commissioning process using building information modeling: an action-research project","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Project commissioning; Building information modeling; Process (computing); Action research; Action plan; Plan (archaeology); Process management; Engineering; Systems engineering; Computer science; Engineering management; Publishing; Operations management; Management","score_opus":0.06907814646562467,"score_gpt":0.34494219836169293,"score_spread":0.2758640518960683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385723933","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72786075,0.0008055373,0.2045901,0.009555661,0.00025307838,0.020463547,0.00085245015,0.0011061102,0.034512788],"genre_scores_gemma":[0.5221156,0.0008956351,0.46510527,0.00075872906,0.000033784876,0.005613177,0.0007325226,0.00019774573,0.0045474973],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.95336944,0.03808659,0.0011163756,0.0013293286,0.0037048357,0.0023934864],"domain_scores_gemma":[0.96761906,0.0189815,0.0016361679,0.004090125,0.0042473986,0.0034257548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05630069,0.0016133086,0.0006724176,0.0019586335,0.0046421015,0.005694867,0.0027705138,0.0033852682,0.0030092201],"category_scores_gemma":[0.027485615,0.00095677515,0.001101778,0.0022431016,0.0044738944,0.0053616837,0.007342548,0.0040487275,0.00074426824],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001325063,0.0362609,0.020217763,0.004652955,0.00018151106,0.0031210354,0.16852413,0.042448852,0.03356251,0.07107096,0.0149135655,0.6037208],"study_design_scores_gemma":[0.0022746108,0.017538553,0.027895149,0.0052493215,0.0005778983,0.0032590223,0.35809782,0.11787406,0.10486845,0.04416268,0.3174919,0.00071056],"about_ca_topic_score_codex":0.0057490417,"about_ca_topic_score_gemma":0.0060960045,"teacher_disagreement_score":0.05630069,"about_ca_system_score_codex":0.0060527376,"about_ca_system_score_gemma":0.026638135,"threshold_uncertainty_score":0.29775006},"labels":[],"label_agreement":null},{"id":"W4402950098","doi":"10.1108/ecam-04-2023-0387","title":"Between a rock and a hard place: managers’ work–family issues in the construction industry and how they compare to workers","year":2024,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Work-Family Balance Challenges","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Work (physics); Construction industry; Business; Sociology; Architectural engineering; Construction engineering; Engineering; Mechanical engineering","score_opus":0.018110288025130837,"score_gpt":0.2603984830168864,"score_spread":0.24228819499175555,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402950098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966143,0.00079432875,0.00008374359,0.000856828,0.00002814,0.000007988289,0.000022390042,0.000001896542,0.0015904568],"genre_scores_gemma":[0.9987668,0.00031420708,0.000054473887,0.00021543034,0.000009362552,0.000011941712,0.000016394944,0.0000024878757,0.00060892396],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99615866,0.001899924,0.00017924236,0.00026006487,0.0006600923,0.00084210216],"domain_scores_gemma":[0.9950642,0.0015809091,0.0013961883,0.00012771782,0.0005924495,0.001238575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041662343,0.00029234504,0.00037799304,0.0015301812,0.0052823187,0.0043786247,0.0007141709,0.0008301012,0.0033039043],"category_scores_gemma":[0.0091082,0.00033937668,0.00034435402,0.0011900023,0.0031180705,0.0017027647,0.0027237597,0.0010752426,0.00032698832],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001080033,0.00013530265,0.37429032,0.00012823092,0.000042315518,0.00064031564,0.59632987,0.00004800783,0.00045407127,0.0003697045,0.0014511026,0.026002754],"study_design_scores_gemma":[0.0000036738572,0.00008486723,0.20257601,0.00008517185,0.000009275851,0.00021473794,0.79389894,0.000033044354,0.000060262177,0.00010911747,0.0029078852,0.00001699943],"about_ca_topic_score_codex":0.0715267,"about_ca_topic_score_gemma":0.14015543,"teacher_disagreement_score":0.0715267,"about_ca_system_score_codex":0.004437109,"about_ca_system_score_gemma":0.0041178493,"threshold_uncertainty_score":0.14222074},"labels":[],"label_agreement":null},{"id":"W4404599295","doi":"10.1108/ecam-02-2024-0268","title":"Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: a machine learning approach","year":2024,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Dashboard; Productivity; Computer science; Analytics; Warning system; Data science; Control (management); Identification (biology); Knowledge management; Risk analysis (engineering); Process management; Engineering; Artificial intelligence","score_opus":0.047579299260561786,"score_gpt":0.37885946210245314,"score_spread":0.3312801628418913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404599295","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040808666,0.0010069124,0.9468531,0.003518977,0.00008962597,0.000477937,0.00042069572,0.0016468797,0.0051771537],"genre_scores_gemma":[0.61414003,0.000810463,0.38191533,0.00053826097,0.00014714562,0.00036816607,0.00051245705,0.000070268,0.0014978396],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99454063,0.0025417367,0.00041819477,0.001048225,0.0011307094,0.00032058448],"domain_scores_gemma":[0.9827671,0.011514456,0.0016510559,0.0011278761,0.0024782899,0.00046125427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008435239,0.0015080574,0.0012600032,0.0047265203,0.000596679,0.004484406,0.0019225505,0.0014172164,0.001975542],"category_scores_gemma":[0.019957937,0.0005427082,0.0010782522,0.002649213,0.0010209462,0.0040197033,0.0024768137,0.0023178018,0.0005662941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004039593,0.0015444799,0.035025008,0.0014849533,0.00045030593,0.00042725325,0.0018037817,0.22955972,0.005578252,0.01784762,0.00498487,0.7008898],"study_design_scores_gemma":[0.000033258882,0.0002345758,0.006199908,0.00042285223,0.00009606144,0.00011166855,0.0006990832,0.95224327,0.0035225423,0.030728716,0.0056286063,0.000079487276],"about_ca_topic_score_codex":0.004765947,"about_ca_topic_score_gemma":0.0046703066,"teacher_disagreement_score":0.008435239,"about_ca_system_score_codex":0.001742617,"about_ca_system_score_gemma":0.0028035801,"threshold_uncertainty_score":0.04461032},"labels":[],"label_agreement":null},{"id":"W4407816378","doi":"10.1108/ecam-06-2024-0815","title":"Unsupervised learning approach for benchmark models to identify construction projects with high accident risk levels","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Benchmark (surveying); Accident (philosophy); Computer science; Artificial intelligence; Machine learning; Geography; Cartography","score_opus":0.04121261154202758,"score_gpt":0.36462513560999255,"score_spread":0.32341252406796495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407816378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05196924,0.00017426517,0.9439569,0.00022316101,0.000029840736,0.00019357765,0.00039633358,0.0011113076,0.0019453454],"genre_scores_gemma":[0.729451,0.00013992433,0.2655117,0.00013910394,0.000049671315,0.0006398402,0.001879824,0.00013575608,0.0020532268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99874026,0.00048005817,0.00009369829,0.0003201056,0.00024164705,0.00012422564],"domain_scores_gemma":[0.9960672,0.0021762631,0.00044692683,0.00028199365,0.0009036352,0.00012397341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003119608,0.0010494761,0.00094566995,0.002401533,0.000755515,0.0014173203,0.001842862,0.0011429888,0.0020548825],"category_scores_gemma":[0.009966523,0.00047165048,0.001139326,0.0013700044,0.00055532856,0.000991777,0.0013394577,0.001444916,0.00051676267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011994669,0.00019144754,0.009667492,0.0000763211,0.00013605863,0.000072102215,0.00013998269,0.8758491,0.00090445497,0.0062702126,0.0020654006,0.10450753],"study_design_scores_gemma":[0.0000034724208,0.000016698345,0.00053366733,0.0000065182635,0.0000059391646,0.0000076120723,0.000017918926,0.99686277,0.0001687184,0.0021675203,0.00020413038,0.0000051182883],"about_ca_topic_score_codex":0.011818532,"about_ca_topic_score_gemma":0.010714557,"teacher_disagreement_score":0.011818532,"about_ca_system_score_codex":0.0016698876,"about_ca_system_score_gemma":0.0017813346,"threshold_uncertainty_score":0.023499489},"labels":[],"label_agreement":null},{"id":"W4408119161","doi":"10.1108/ecam-11-2024-1517","title":"Enhancing construction workers’ health and safety: mechanisms for implementing Construction 4.0 technologies in construction organizations","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Economic and Technological Systems Analysis","field":"Business, Management and Accounting","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Construction site safety; Business; Construction engineering; Construction industry; Occupational safety and health; Engineering; Engineering management; Medicine","score_opus":0.004505919126639348,"score_gpt":0.1932083672691746,"score_spread":0.18870244814253526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408119161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9409732,0.00070069765,0.020401863,0.005753041,0.000038419897,0.0006300166,0.00005875837,0.00013977016,0.031304173],"genre_scores_gemma":[0.99428976,0.00017572335,0.0045641395,0.00018642111,0.000006209967,0.00012097127,0.000012966218,0.000004603739,0.000639171],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99473226,0.0030523173,0.00024105702,0.00038529452,0.0007350001,0.0008540787],"domain_scores_gemma":[0.9796348,0.00849372,0.0074122725,0.0009281365,0.0019146313,0.0016164504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007067425,0.00054456294,0.00017592985,0.0020305067,0.0014779831,0.003810276,0.00080747815,0.0013922686,0.004610675],"category_scores_gemma":[0.016497565,0.00043050642,0.00058890425,0.0008018719,0.004189274,0.0015948572,0.0029451991,0.0008446472,0.00033126443],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000204846,0.0025685239,0.66899246,0.0013623534,0.0002941094,0.0006509238,0.033222,0.0049363934,0.009930038,0.051274788,0.001782999,0.22478059],"study_design_scores_gemma":[0.00014448258,0.0021172417,0.8487654,0.0019150426,0.0003703819,0.00047284056,0.07412122,0.008231785,0.009488927,0.03270327,0.021498177,0.00017112629],"about_ca_topic_score_codex":0.0044520176,"about_ca_topic_score_gemma":0.0048389207,"teacher_disagreement_score":0.007067425,"about_ca_system_score_codex":0.0025643103,"about_ca_system_score_gemma":0.010863943,"threshold_uncertainty_score":0.037376583},"labels":[],"label_agreement":null},{"id":"W4408500828","doi":"10.1108/ecam-05-2024-0678","title":"Construction and demolition waste circulation and its sustainability performance in the building sector: current trend and future directions","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Demolition; Sustainability; Current (fluid); Demolition waste; Circulation (fluid dynamics); Business; Environmental planning; Environmental science; Civil engineering; Engineering; Ecology","score_opus":0.0036514951399682803,"score_gpt":0.19895537973991512,"score_spread":0.19530388459994683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408500828","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013368486,0.96968126,0.0006216114,0.010300258,0.00027500364,0.000021055992,0.00034553156,0.000034475805,0.0053522848],"genre_scores_gemma":[0.1332772,0.86162615,0.0018329152,0.0014636924,0.0006202243,0.00003837389,0.00032625275,0.000016095932,0.0007989942],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9973066,0.0007106621,0.0004625253,0.0004533083,0.0008486406,0.00021834733],"domain_scores_gemma":[0.9750328,0.014874606,0.003356803,0.00035188269,0.005748119,0.000635849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063711307,0.00051728234,0.0011950446,0.008814383,0.0006529039,0.006899227,0.000639561,0.0013880837,0.004850392],"category_scores_gemma":[0.010893379,0.00025443305,0.0010915997,0.019692332,0.0019639612,0.0061729806,0.0014263238,0.0011526813,0.0007580666],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002536559,0.00019721875,0.037620675,0.06893853,0.00041614618,0.0003035461,0.0043421118,0.00073806144,0.0013420366,0.023871562,0.01377656,0.8481999],"study_design_scores_gemma":[0.000040625535,0.0008252587,0.21049634,0.1479236,0.0034046518,0.0025495056,0.050635323,0.0024775618,0.0024639154,0.040805336,0.5380255,0.00035246345],"about_ca_topic_score_codex":0.009354091,"about_ca_topic_score_gemma":0.01060345,"teacher_disagreement_score":0.009354091,"about_ca_system_score_codex":0.002663935,"about_ca_system_score_gemma":0.008971831,"threshold_uncertainty_score":0.033694148},"labels":[],"label_agreement":null},{"id":"W4411516468","doi":"10.1108/ecam-11-2024-1519","title":"A scoping review of fire safety on building construction sites: current measures, practices and future research directions","year":2025,"lang":"en","type":"review","venue":"Engineering Construction & Architectural Management","topic":"Evacuation and Crowd Dynamics","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; University of Alberta","funders":"","keywords":"Field (mathematics); Originality; Scopus; Conceptual framework; Flammable liquid; Engineering; Knowledge management; Data science; Computer science; Qualitative research; Political science","score_opus":0.045761262781074265,"score_gpt":0.373434095344881,"score_spread":0.3276728325638067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411516468","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011393286,0.990998,0.0012417652,0.0027954644,0.00064930355,0.00040419426,0.00034013984,0.000025079778,0.0024067876],"genre_scores_gemma":[0.0068761464,0.989335,0.0015642894,0.00077226287,0.000196511,0.000676343,0.00028515034,0.000015753723,0.0002785324],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9688338,0.0111623155,0.0106655685,0.002069718,0.0065271067,0.00074147794],"domain_scores_gemma":[0.843897,0.108705364,0.01684633,0.0038305956,0.025445715,0.001274919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03888228,0.0020728123,0.0043978365,0.030633472,0.0028017464,0.009235569,0.003203776,0.0039834827,0.0056049475],"category_scores_gemma":[0.1316683,0.0014538087,0.004804784,0.032857906,0.0035796408,0.009080017,0.004947551,0.003246323,0.0013004062],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000091309026,0.000050043145,0.0012289247,0.61512643,0.000736371,0.00033953498,0.0053317794,0.00045933365,0.000410655,0.007025607,0.017654585,0.35154545],"study_design_scores_gemma":[0.0000085948805,0.00003956233,0.0012922992,0.9182812,0.0012048535,0.00020894509,0.002466608,0.00007565238,0.00015048486,0.0014930702,0.074754804,0.000023900255],"about_ca_topic_score_codex":0.013125175,"about_ca_topic_score_gemma":0.023904651,"teacher_disagreement_score":0.03888228,"about_ca_system_score_codex":0.008600328,"about_ca_system_score_gemma":0.042118285,"threshold_uncertainty_score":0.20563161},"labels":[],"label_agreement":null},{"id":"W4413217569","doi":"10.1108/ecam-12-2024-1662","title":"Minimizing personnel assignment costs in the layout phase of steel component construction","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Flexibility (engineering); Salary; Factory (object-oriented programming); Total cost; Operations research; Computer science; Function (biology); Duration (music); Reduction (mathematics); Cost reduction; Assignment problem; Integer programming; Component (thermodynamics); Operations management; Reliability engineering; Mathematical optimization; Engineering; Mathematics; Business","score_opus":0.007146667112424481,"score_gpt":0.21766574123052077,"score_spread":0.21051907411809628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413217569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46958128,0.0005573588,0.50932056,0.00040374784,0.00007088424,0.0005158545,0.00018141382,0.0003356441,0.019033264],"genre_scores_gemma":[0.89498895,0.00018512561,0.102130644,0.000029713885,0.000007551565,0.00012421494,0.00007960073,0.000054596774,0.0023995081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838924,0.00080956594,0.00004924402,0.00015345532,0.00034322913,0.0002552368],"domain_scores_gemma":[0.99815,0.0009348343,0.0004672774,0.0001516047,0.0001904865,0.00010583795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019608242,0.00093259016,0.00057395245,0.0009026453,0.0007977677,0.0012255633,0.0008121336,0.0005270997,0.0034323612],"category_scores_gemma":[0.0051025287,0.0006127756,0.00048293857,0.0010477368,0.0005322179,0.0011948745,0.000776684,0.00072705024,0.00040370546],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032405902,0.00030679823,0.0074226637,0.0003916017,0.00005573694,0.00013166205,0.00027474796,0.82236195,0.010167139,0.009572495,0.0011277982,0.14786343],"study_design_scores_gemma":[0.000056925757,0.0013090246,0.015853798,0.00011250734,0.00009668817,0.00019324667,0.00086143584,0.9536073,0.013407883,0.009274628,0.005164745,0.000061909705],"about_ca_topic_score_codex":0.007948914,"about_ca_topic_score_gemma":0.013691938,"teacher_disagreement_score":0.007948914,"about_ca_system_score_codex":0.0021262555,"about_ca_system_score_gemma":0.0043981248,"threshold_uncertainty_score":0.015805304},"labels":[],"label_agreement":null},{"id":"W4414019570","doi":"10.1108/ecam-02-2025-0312","title":"Human-centric integrated change management framework for digital transformation in construction","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Ergonomics and Human Factors","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Transformation (genetics); Digital transformation; Process management; Change management (ITSM); Business; Computer science; Knowledge management; Engineering; Operations management; World Wide Web; Chemistry","score_opus":0.008567780844789147,"score_gpt":0.21369478789967092,"score_spread":0.20512700705488177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414019570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0155229485,0.007592284,0.8676609,0.015334787,0.00045371818,0.0034732437,0.0010743248,0.00049463165,0.088393174],"genre_scores_gemma":[0.33410007,0.004058829,0.64916784,0.0013568511,0.00012954716,0.004983792,0.00084648625,0.00008859271,0.0052680187],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.987104,0.008675259,0.0007108361,0.0014399196,0.001642588,0.00042739458],"domain_scores_gemma":[0.9898732,0.0065892297,0.0008768631,0.0006933033,0.0015387371,0.00042871208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015046522,0.0015376748,0.0008350239,0.011175596,0.0023941966,0.007621617,0.0030183955,0.0023471855,0.0052665123],"category_scores_gemma":[0.011910139,0.0005027357,0.0018673019,0.006483135,0.010204319,0.006574282,0.0047936356,0.0023261728,0.00078892946],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033676435,0.000112828886,0.002675914,0.0027731864,0.00012441064,0.00022219664,0.009529216,0.012876336,0.0005978925,0.8859607,0.0039489856,0.0811447],"study_design_scores_gemma":[0.000055378947,0.00021846908,0.0050780983,0.0048328154,0.00026335972,0.00038091405,0.02093554,0.040516153,0.0012322598,0.66567653,0.26070267,0.0001078602],"about_ca_topic_score_codex":0.008732022,"about_ca_topic_score_gemma":0.009936789,"teacher_disagreement_score":0.015046522,"about_ca_system_score_codex":0.0113245975,"about_ca_system_score_gemma":0.015488648,"threshold_uncertainty_score":0.082166076},"labels":[],"label_agreement":null},{"id":"W4414072449","doi":"10.1108/ecam-03-2025-0388","title":"Enabling Lean Construction 4.0 through human-centric digital transformation: organisational leadership insights","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Digital transformation; Thematic analysis; Bridge (graph theory); Human resources; Lean manufacturing; Lean construction; Grounded theory; Human resource management; Resource (disambiguation)","score_opus":0.017825977419998286,"score_gpt":0.2091785451111105,"score_spread":0.19135256769111222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414072449","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57092696,0.0029074703,0.1264669,0.07982015,0.0009839598,0.00052542426,0.00006514794,0.0004730289,0.21783093],"genre_scores_gemma":[0.9806476,0.0007274329,0.012183754,0.0017358238,0.00007387153,0.0001054856,0.00002571777,0.000041873645,0.0044583087],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9822404,0.011447496,0.0003465545,0.0004766734,0.0029520732,0.0025367024],"domain_scores_gemma":[0.9847274,0.0074346852,0.0014282172,0.00072861026,0.0020154521,0.0036655525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013545587,0.00042845507,0.00021933138,0.0012723433,0.004313123,0.010463228,0.0011665717,0.0015678462,0.0032247396],"category_scores_gemma":[0.011596241,0.00027046705,0.0004087104,0.00088752544,0.0089289835,0.0048903204,0.009483379,0.0028437793,0.00070490525],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018937222,0.00085436925,0.029268436,0.00229584,0.000100746714,0.003899031,0.37253088,0.004654384,0.008399208,0.2912452,0.021835169,0.26472738],"study_design_scores_gemma":[0.000074636824,0.00072288257,0.011826257,0.001905432,0.000051960404,0.0013653282,0.51756555,0.006511213,0.0051801433,0.10076033,0.3539071,0.00012906497],"about_ca_topic_score_codex":0.0016773846,"about_ca_topic_score_gemma":0.0029649297,"teacher_disagreement_score":0.013545587,"about_ca_system_score_codex":0.0046214676,"about_ca_system_score_gemma":0.016619895,"threshold_uncertainty_score":0.071636796},"labels":[],"label_agreement":null},{"id":"W4414393777","doi":"10.1108/ecam-12-2024-1701","title":"Synergistic evolution of multi-stakeholder strategies in the promotion of green building materials, quadrilateral evolutionary game and system dynamics","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Incentive; Certification; Government (linguistics); Subsidy; Promotion (chess); Green building; Evolutionarily stable strategy; Publicity","score_opus":0.007802318295347156,"score_gpt":0.2105198055369792,"score_spread":0.20271748724163202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414393777","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41046467,0.00028247287,0.53569776,0.0014955688,0.00008911846,0.00040747802,0.00016196951,0.000069901,0.051331148],"genre_scores_gemma":[0.9802209,0.000105333966,0.015106227,0.00007572839,0.000005402429,0.00016184831,0.000019548628,0.000005365184,0.0042995256],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987702,0.00073539437,0.000032687356,0.00017104621,0.00012724842,0.00016328102],"domain_scores_gemma":[0.9984812,0.0008793985,0.00027166854,0.00005111647,0.00013704925,0.00017969059],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015980571,0.0006789316,0.00054947735,0.00047291684,0.0007519237,0.0018404576,0.0009050873,0.0012559516,0.004345065],"category_scores_gemma":[0.0034716837,0.0002949324,0.0006611314,0.0003988266,0.001675834,0.001706464,0.0019832775,0.0011200475,0.0002141024],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002083711,0.00019080767,0.005975472,0.00017044392,0.00011572277,0.00096338254,0.00082759623,0.7092826,0.005200495,0.26317897,0.0007121974,0.013173868],"study_design_scores_gemma":[0.000032453852,0.0001732911,0.0010814026,0.000020821832,0.000026946787,0.00008653262,0.000563031,0.9498161,0.0003674271,0.046356436,0.0014502079,0.00002530849],"about_ca_topic_score_codex":0.005625417,"about_ca_topic_score_gemma":0.0046734465,"teacher_disagreement_score":0.005625417,"about_ca_system_score_codex":0.0018009414,"about_ca_system_score_gemma":0.0013937266,"threshold_uncertainty_score":0.0145356655},"labels":[],"label_agreement":null},{"id":"W4416306757","doi":"10.1108/ecam-03-2025-0385","title":"Illustrating the impact of implementing work zones, adjusting work patterns and optimizing crew starting positions to minimize spatial conflicts","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Crew; Work (physics); Workflow; Task (project management); Productivity; Cockpit; Spatial planning; Resource (disambiguation)","score_opus":0.0059245777748070105,"score_gpt":0.21984947652847028,"score_spread":0.21392489875366327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416306757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9364445,0.0002940711,0.056569077,0.00017205196,0.000033732158,0.00016510987,0.00014531458,0.00036353618,0.0058126026],"genre_scores_gemma":[0.9718086,0.00007487557,0.027708342,0.000014755576,0.0000022086228,0.000040516952,0.000051795785,0.000011747589,0.00028723112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991578,0.00036801552,0.00006027286,0.000121499106,0.00014920792,0.00014323604],"domain_scores_gemma":[0.99666876,0.0018842593,0.0005303717,0.0003519622,0.00030972276,0.00025496978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010294876,0.0010104433,0.00024173126,0.00063393905,0.0004516586,0.0011541201,0.00063517824,0.00047425894,0.001807363],"category_scores_gemma":[0.0051824925,0.00027564497,0.00031891372,0.00057332177,0.00039674045,0.00072581624,0.000856233,0.00035504389,0.00027141973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012954188,0.0011359544,0.04292379,0.0005813512,0.00010887146,0.00023905752,0.0007127574,0.75153756,0.03793725,0.003698779,0.00073947426,0.15908982],"study_design_scores_gemma":[0.00030299075,0.0063497876,0.04557377,0.00021019526,0.00031481456,0.00030938393,0.0029266921,0.8608466,0.06995289,0.00525703,0.007768912,0.00018697864],"about_ca_topic_score_codex":0.006596474,"about_ca_topic_score_gemma":0.008306326,"teacher_disagreement_score":0.006596474,"about_ca_system_score_codex":0.0007825702,"about_ca_system_score_gemma":0.0015580114,"threshold_uncertainty_score":0.013116181},"labels":[],"label_agreement":null},{"id":"W4416947709","doi":"10.1108/ecam-04-2025-0645","title":"Scan-to-BIM approach for enhanced semi-automated cost management in modular off-site construction","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure; National Research Council Canada","funders":"Mitacs","keywords":"Modular design; Cost estimate; Prefabrication; Cost efficiency; Cost driver; Modular programming; Cost accounting; Cost reduction; Lean manufacturing","score_opus":0.0038265241752745375,"score_gpt":0.20396387286185955,"score_spread":0.200137348686585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416947709","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04017964,0.00021920326,0.93778515,0.00040637702,0.000044741326,0.00041618184,0.00065346685,0.0020474154,0.018247845],"genre_scores_gemma":[0.2821072,0.00029447066,0.71298486,0.00010042793,0.0000145660615,0.000382216,0.000799631,0.00030982104,0.003006832],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9958404,0.0011470651,0.00019130482,0.00037976846,0.0022144348,0.00022700077],"domain_scores_gemma":[0.9963393,0.001039168,0.0005163857,0.0006859082,0.001296287,0.00012294466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003071314,0.0011643543,0.00065678207,0.0044394517,0.00086286024,0.0033492167,0.0019003609,0.00068166695,0.006312947],"category_scores_gemma":[0.006262524,0.00074097817,0.0012080725,0.0032507079,0.000979878,0.0027793464,0.0036743293,0.0009797848,0.0013231505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002475317,0.00036152854,0.015676348,0.00081960176,0.00015058438,0.00043402583,0.0023767664,0.22804359,0.013732081,0.061089363,0.0076960432,0.66937256],"study_design_scores_gemma":[0.000056510307,0.0003147646,0.016517652,0.00038613053,0.00016088129,0.000566472,0.0036298977,0.8421796,0.021757498,0.0506874,0.063544855,0.00019832415],"about_ca_topic_score_codex":0.014860891,"about_ca_topic_score_gemma":0.03154085,"teacher_disagreement_score":0.014860891,"about_ca_system_score_codex":0.0027212494,"about_ca_system_score_gemma":0.0051984917,"threshold_uncertainty_score":0.029548824},"labels":[],"label_agreement":null},{"id":"W7081981143","doi":"10.1108/ecam-04-2025-0585","title":"A human-centered framework for assessing task complexity in construction: a cognitive load perspective","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Geochemistry and Geologic Mapping","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Task (project management); Cognitive load; Cognition; Construct (python library); Process (computing); Task analysis; Perspective (graphical); Cognitive model","score_opus":0.023078064672263962,"score_gpt":0.2847655589276697,"score_spread":0.2616874942554057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7081981143","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25789306,0.0023140481,0.6878482,0.003555105,0.0001530792,0.0016008749,0.00064864376,0.00053899345,0.0454481],"genre_scores_gemma":[0.8394605,0.00060351175,0.15709898,0.00029192425,0.00005068755,0.0011499323,0.00023081958,0.00005077464,0.0010628636],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9935666,0.0029727106,0.00041213198,0.0006608841,0.0020801343,0.00030761308],"domain_scores_gemma":[0.9822037,0.010492381,0.003009597,0.001050897,0.0024889167,0.0007544286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073944447,0.0018454521,0.0005682013,0.008273683,0.0014215776,0.005055185,0.0015784627,0.0012135619,0.0028141807],"category_scores_gemma":[0.018672075,0.00051705976,0.0011521846,0.0032500017,0.005977244,0.003939299,0.0036462692,0.0017643496,0.00034185027],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036706182,0.00201546,0.20041858,0.0036045157,0.0005648927,0.00056565664,0.035254396,0.054466557,0.0116212545,0.27613443,0.0056607733,0.40932646],"study_design_scores_gemma":[0.00013185885,0.0021503393,0.30998537,0.0030593364,0.00047407186,0.0008810049,0.026882127,0.16175212,0.008310998,0.44846985,0.037394743,0.00050821796],"about_ca_topic_score_codex":0.008254526,"about_ca_topic_score_gemma":0.0105073145,"teacher_disagreement_score":0.008273683,"about_ca_system_score_codex":0.005610675,"about_ca_system_score_gemma":0.005364214,"threshold_uncertainty_score":0.040708482},"labels":[],"label_agreement":null},{"id":"W7117460599","doi":"10.1108/ecam-04-2025-0550","title":"Human-centered design and development framework for autonomous inspection robot systems in Lean Construction 4.0","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Agile software development; Robot; Adaptability; Value stream mapping; Hazardous waste; Agile manufacturing; Lean manufacturing","score_opus":0.016419867177959988,"score_gpt":0.2393217064278438,"score_spread":0.22290183924988383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117460599","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003959129,0.00025051727,0.984412,0.0005377529,0.00003430367,0.00056696334,0.000034593166,0.00045462037,0.00975007],"genre_scores_gemma":[0.06809963,0.00034478094,0.9259862,0.00015742992,0.000015117516,0.0010781913,0.000100148645,0.000071594375,0.0041469247],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9961695,0.0018238146,0.00021951504,0.00035412615,0.0011858556,0.00024711806],"domain_scores_gemma":[0.9980818,0.00080222933,0.0002047739,0.00015314524,0.00055586564,0.00020213437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005469858,0.0009933587,0.00034783158,0.0015680991,0.0010846783,0.0034655754,0.0020347356,0.0014934893,0.0031780272],"category_scores_gemma":[0.0029169105,0.0005503081,0.0009529055,0.00059879065,0.0032272928,0.001380667,0.0026769254,0.0013917855,0.00089146727],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011781118,0.00037505536,0.0023775713,0.0014469087,0.00008017561,0.001253825,0.008477278,0.1497459,0.018594606,0.64638627,0.004809734,0.16633482],"study_design_scores_gemma":[0.00019937217,0.0007565001,0.0017434226,0.0017351215,0.00013341107,0.0011151553,0.0030906412,0.41680154,0.017104767,0.23016435,0.3269851,0.00017058614],"about_ca_topic_score_codex":0.0057507213,"about_ca_topic_score_gemma":0.0061424915,"teacher_disagreement_score":0.0057507213,"about_ca_system_score_codex":0.0026500355,"about_ca_system_score_gemma":0.008507786,"threshold_uncertainty_score":0.028927743},"labels":[],"label_agreement":null}]}