{"meta":{"query_hash":"b94dc647b8a4","filters":{"venue":"Environmental Research Infrastructure and Sustainability"},"cohort_total":32,"direct_labels_cover":0,"predictions_cover":32,"exported":32,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/b94dc647b8a4","api":"https://metacan.xera.ac/api/v1/cohort?venue=Environmental+Research+Infrastructure+and+Sustainability"},"results":[{"id":"W3173184689","doi":"10.1088/2634-4505/ac0f32","title":"The concept of value in sustainable infrastructure systems: a literature review","year":2021,"lang":"en","type":"review","venue":"Environmental Research Infrastructure and Sustainability","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Sustainability; Interdependence; Variety (cybernetics); Value (mathematics); Context (archaeology); Management science; Critical infrastructure; Sustainable Value; Computer science; Conceptual framework; Knowledge management; Risk analysis (engineering); Business; Sociology; Economics; Social science; Computer security","score_opus":0.012064097725163963,"score_gpt":0.31535957298519884,"score_spread":0.30329547526003486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3173184689","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008199765,0.99532247,0.000043084685,0.00005090603,0.00015792726,0.003939411,0.0000943076,0.000040897397,0.0002690236],"genre_scores_gemma":[0.0018232226,0.99620974,0.000042699245,0.000011909255,0.00011035222,0.00057125266,0.00016338116,0.000096137126,0.00097132457],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9932846,0.0020193385,0.0013169905,0.00081567816,0.0010533442,0.0015100775],"domain_scores_gemma":[0.9967313,0.0013100213,0.00019825771,0.0012420913,0.0002415307,0.00027684527],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0031233164,0.0007767253,0.0021945725,0.0004035534,0.0003907015,0.00033135051,0.00081334735,0.0006702273,0.000053238058],"category_scores_gemma":[0.001109063,0.00053626206,0.0003672208,0.0015852666,0.0009771826,0.0002678188,0.0007690803,0.0029508045,8.933694e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011819685,0.000059964914,0.00010288832,0.27625006,0.00025023802,0.000720398,0.00058937084,0.002208664,5.936896e-7,0.012947471,0.010733662,0.69612485],"study_design_scores_gemma":[0.00020550622,0.00007820899,0.00010798114,0.023648988,0.000113199756,0.00011398486,0.006912996,0.00017229586,0.0000019447493,0.0029747472,0.9652338,0.00043631994],"about_ca_topic_score_codex":0.000028699986,"about_ca_topic_score_gemma":7.844308e-7,"teacher_disagreement_score":0.95450014,"about_ca_system_score_codex":0.0039220266,"about_ca_system_score_gemma":0.001215375,"threshold_uncertainty_score":0.9999017},"labels":[],"label_agreement":null},{"id":"W3173406468","doi":"10.1088/2634-4505/ac0f98","title":"Capturing practitioner perspectives on infrastructure resilience using Q-methodology","year":2021,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Disaster Management and Resilience","field":"Social Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"National Science Foundation","keywords":"Resilience (materials science); Interpretation (philosophy); Multidisciplinary approach; Critical infrastructure; Metropolitan area; Value (mathematics); Urban resilience; Management science; Computer science; Sociology; Knowledge management; Risk analysis (engineering); Business; Urban planning; Engineering; Geography; Computer security; Social science; Civil engineering","score_opus":0.04170559801138871,"score_gpt":0.39128774530472943,"score_spread":0.3495821472933407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3173406468","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9831638,0.000493971,0.0008779057,0.0020003212,0.00013155147,0.00046872755,0.000009748675,0.000030344581,0.01282365],"genre_scores_gemma":[0.9948603,0.00051516265,0.0019524243,0.000114405746,0.00020098976,0.0000147321625,0.000005460902,0.000013093406,0.0023234657],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9950366,0.0021669224,0.0002158847,0.0007801933,0.0010105195,0.0007898753],"domain_scores_gemma":[0.99846774,0.0006406584,0.00006625085,0.00042239347,0.00013769764,0.00026527912],"candidate_categories":["sts","insufficient_payload"],"consensus_categories":["sts"],"category_scores_codex":[0.0021023187,0.00018429178,0.00021024147,0.00017043618,0.0015891973,0.00021512918,0.00029668145,0.0001892269,0.0009940651],"category_scores_gemma":[0.0029860118,0.00016788884,0.000064541586,0.00043568423,0.002852953,0.000495228,0.0004727901,0.0007791753,0.0000061532346],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065385475,0.00079727557,0.34159333,0.00039172388,0.00016374575,0.0007839731,0.267622,0.0076552993,0.008170865,0.24420294,0.0031853854,0.12477962],"study_design_scores_gemma":[0.0002775153,0.00009699951,0.26354352,0.000017064713,0.000011749246,0.000013299248,0.6014419,0.00013691794,0.00038004888,0.10292423,0.030914549,0.00024221148],"about_ca_topic_score_codex":0.00024186981,"about_ca_topic_score_gemma":0.000078633784,"teacher_disagreement_score":0.33381993,"about_ca_system_score_codex":0.0012752328,"about_ca_system_score_gemma":0.0005028445,"threshold_uncertainty_score":0.9999192},"labels":[],"label_agreement":null},{"id":"W3208465088","doi":"10.1088/2634-4505/ac333a","title":"Global Dam Watch: curated data and tools for management and decision making","year":2021,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Flood Risk Assessment and Management","field":"Environmental Science","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Wildlife Federation; McGill University","funders":"European Regional Development Fund; WWF International; Agence Nationale de la Recherche; National Socio-Environmental Synthesis Center","keywords":"Directory; Scale (ratio); Computer science; Environmental resource management; Decision support system; Data science; Database; Environmental science; Geography; Data mining; Cartography","score_opus":0.02731173029874146,"score_gpt":0.3606532075177596,"score_spread":0.33334147721901813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208465088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9882814,0.00051333837,0.007948259,0.00074260274,0.00005156019,0.0012131343,0.00012682586,0.0000186851,0.0011041536],"genre_scores_gemma":[0.983034,0.0010092837,0.015411058,0.00010501557,0.000026191818,0.000055991448,0.00011624433,0.000012521299,0.00022968739],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9973672,0.0001433092,0.00024862005,0.001043869,0.0006139863,0.0005829989],"domain_scores_gemma":[0.99874127,0.00027600233,0.000040176248,0.000733199,0.000013371409,0.0001959606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011342941,0.00020852115,0.0001973561,0.000029432293,0.0005249254,0.00039197018,0.00031901864,0.00009079167,0.0003746725],"category_scores_gemma":[0.0002461506,0.00018237997,0.000024564431,0.00021850766,0.0007187324,0.00088954915,0.005123366,0.00018847336,0.0000030369565],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013736835,0.00009301702,0.2826849,0.0001500207,0.000038850176,0.00006080626,0.0001567129,0.000114971386,0.000057628986,0.0009684187,0.0047887773,0.7107485],"study_design_scores_gemma":[0.0007875409,0.00012268327,0.80832165,0.00001712521,0.000033257962,0.000017050903,0.006829365,0.004049455,0.000027270076,0.11451074,0.06506504,0.00021881453],"about_ca_topic_score_codex":0.00003338049,"about_ca_topic_score_gemma":0.000078334815,"teacher_disagreement_score":0.7105297,"about_ca_system_score_codex":0.00058646133,"about_ca_system_score_gemma":0.00002387791,"threshold_uncertainty_score":0.7437239},"labels":[],"label_agreement":null},{"id":"W4285093626","doi":"10.1088/2634-4505/ac8071","title":"Does the metric matter? Climate change impacts of light-duty vehicle electrification in the US","year":2022,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Energy, Environment, and Transportation Policies","field":"Energy","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Electrification; Greenhouse gas; Radiative forcing; Climate change; Environmental science; Global warming; Climate change mitigation; Metric (unit); Electricity; Environmental economics; Business; Engineering; Economics; Ecology","score_opus":0.010189591773614594,"score_gpt":0.2779094380055042,"score_spread":0.2677198462318896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285093626","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9946483,0.00044722744,0.0000028627662,0.0036488962,0.000032496886,0.00062984944,0.000057727437,0.000007620799,0.00052503584],"genre_scores_gemma":[0.9985412,0.0006044372,0.000006523062,0.00033100025,0.00004485821,0.00035144234,0.000042936306,0.00001528439,0.000062343344],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9970543,0.00097295234,0.00031755847,0.00032017913,0.00079232705,0.0005427124],"domain_scores_gemma":[0.99899775,0.000296593,0.00009474041,0.0005293054,0.00001331948,0.000068288624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018532719,0.00014927721,0.00016136553,0.00019572316,0.00065074005,0.000035429628,0.00040070873,0.000057251935,0.0005280865],"category_scores_gemma":[0.00007567912,0.0000773417,0.00006217316,0.00058756256,0.0004528505,0.00016412485,0.00012633542,0.0005919629,0.0000030221054],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000200835,0.00036654092,0.9582882,0.00012393482,0.000025273459,0.00001247037,0.012298205,0.0014493321,0.0035227556,0.0072869966,0.0001199194,0.01630554],"study_design_scores_gemma":[0.0003352581,0.00012312285,0.9582166,0.000001786084,0.000009332918,0.0000035437408,0.012206632,0.00005519893,0.0026002165,0.01498794,0.011369554,0.00009083286],"about_ca_topic_score_codex":0.0018044885,"about_ca_topic_score_gemma":0.0002594908,"teacher_disagreement_score":0.016214708,"about_ca_system_score_codex":0.00046831276,"about_ca_system_score_gemma":0.0000324546,"threshold_uncertainty_score":0.5782177},"labels":[],"label_agreement":null},{"id":"W4319014645","doi":"10.1088/2634-4505/acb3f4","title":"Estimating thermal energy loads in remote and northern communities to facilitate a net-zero transition","year":2023,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada; Carleton University","keywords":"Population; Environmental science; Climate change; Environmental resource management; Environmental economics; Meteorology; Geography; Economics; Ecology","score_opus":0.013802071802515968,"score_gpt":0.24539154042631514,"score_spread":0.23158946862379917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319014645","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98589474,0.00009267096,0.013153364,0.00015270634,0.000039060516,0.00027063413,0.000022999435,0.00009379087,0.00028005053],"genre_scores_gemma":[0.99910504,0.000057613885,0.00057559035,0.000018423738,0.000021553678,0.000035067125,0.00007014265,0.000026260537,0.00009028582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855375,0.00028153358,0.00023302046,0.00020434528,0.0002667163,0.00046063715],"domain_scores_gemma":[0.99947494,0.00013514882,0.000011220153,0.00022626162,0.000029716453,0.00012269919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006809638,0.00016617062,0.00016877968,0.00027950262,0.00018940184,0.00005927678,0.00010327173,0.00011794163,0.000023755989],"category_scores_gemma":[0.00006771,0.00016059107,0.00001969235,0.00035063692,0.00022513857,0.00018265814,0.00010564384,0.00037366868,0.0000028553864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040535284,0.000007172658,0.008204628,0.0001457749,0.000011483327,0.000016555661,0.013961539,0.918562,0.0009317143,0.000054185726,0.000045576217,0.058018837],"study_design_scores_gemma":[0.00034500216,0.00011487082,0.09486227,0.000042636177,0.0000027298065,0.000008166035,0.018186988,0.87827617,0.00026620628,0.0070676617,0.0006054145,0.00022185761],"about_ca_topic_score_codex":0.0020150025,"about_ca_topic_score_gemma":0.0007620953,"teacher_disagreement_score":0.086657636,"about_ca_system_score_codex":0.0005653777,"about_ca_system_score_gemma":0.000025936557,"threshold_uncertainty_score":0.6548714},"labels":[],"label_agreement":null},{"id":"W4321184211","doi":"10.1088/2634-4505/acbced","title":"Reducing oil and gas well leakage: a review of leakage drivers, methane detection and repair options","year":2023,"lang":"en","type":"review","venue":"Environmental Research Infrastructure and Sustainability","topic":"Atmospheric and Environmental Gas Dynamics","field":"Environmental Science","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"McGill University","keywords":"Leakage (economics); Casing; Environmental science; Wellhead; Aquifer; Methane; Fossil fuel; Groundwater; Petroleum engineering; Environmental engineering; Geology; Engineering; Waste management; Geotechnical engineering","score_opus":0.017712230400905013,"score_gpt":0.3161950700036436,"score_spread":0.2984828396027386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321184211","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015997918,0.98206943,0.00006877254,0.00011000379,0.000055632438,0.0010927237,0.000050942264,0.00006426928,0.00049028784],"genre_scores_gemma":[0.0011508076,0.9952788,0.0010100403,0.00002885188,0.000040547802,0.00014631682,0.000042940675,0.000077090204,0.0022246407],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9952231,0.0009467989,0.00083869713,0.0013057832,0.0009055982,0.00078000803],"domain_scores_gemma":[0.99807346,0.00042616646,0.00029947143,0.00075657794,0.00001037082,0.00043398252],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.002372601,0.00059457246,0.0013031099,0.00007955295,0.00045516327,0.00003809134,0.0002973323,0.00043761067,0.00063302746],"category_scores_gemma":[0.00044612674,0.00051244907,0.00027476496,0.00054534856,0.0033315534,0.0002990334,0.0020924632,0.0013103053,0.000024205268],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016580205,0.00006142431,0.0011831536,0.048408438,0.00008296085,0.000035384546,0.0002051065,0.000069574715,0.00001909902,0.00001686409,0.00014592624,0.9497555],"study_design_scores_gemma":[0.00052221323,0.00059710845,0.014042516,0.009705154,0.0007610662,0.00027090532,0.002978121,0.00064222387,0.000007792965,0.0031791956,0.966173,0.001120724],"about_ca_topic_score_codex":0.00035152634,"about_ca_topic_score_gemma":0.00002036958,"teacher_disagreement_score":0.9660271,"about_ca_system_score_codex":0.0017841634,"about_ca_system_score_gemma":0.00007625116,"threshold_uncertainty_score":0.99973273},"labels":[],"label_agreement":null},{"id":"W4321480246","doi":"10.1088/2634-4505/acbe15","title":"Dynamic criticality for infrastructure prioritization in complex environments","year":2023,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Supply Chain Resilience and Risk Management","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Air Force Institute of Technology; Division of Civil, Mechanical and Manufacturing Innovation","keywords":"Dynamic capabilities; Flexibility (engineering); Critical infrastructure; Criticality; Computer science; Resilience (materials science); Risk analysis (engineering); Prioritization; Process management; Knowledge management; Business; Computer security","score_opus":0.01798862232042451,"score_gpt":0.3214097661694954,"score_spread":0.3034211438490709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321480246","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99369305,0.00006600003,0.0011398739,0.0023400702,0.00009627212,0.0020916553,0.000037768765,0.000071407194,0.00046389402],"genre_scores_gemma":[0.99818313,0.00014863597,0.00019065992,0.00036812315,0.0001419109,0.00022627377,0.0003949377,0.00003152502,0.00031480985],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9970978,0.00008104147,0.00039610785,0.0007457639,0.0007162994,0.0009630073],"domain_scores_gemma":[0.999208,0.00022067255,0.00006256122,0.00041300344,0.000038643106,0.00005713908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015941566,0.00025875535,0.00027191575,0.00058074016,0.00052644464,0.00022067218,0.00033636633,0.00016274033,0.0003058798],"category_scores_gemma":[0.0006565146,0.00023773142,0.000072273564,0.0007479816,0.0007489327,0.0007170454,0.00074156665,0.00040713503,0.000036903275],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030612492,0.0002514151,0.8789823,0.0013517481,0.00003205474,0.000062765626,0.0005261273,0.00412594,0.0014429397,0.012207149,0.00946361,0.09124781],"study_design_scores_gemma":[0.0006263474,0.000029782186,0.7360101,0.000007727261,0.000007669618,8.492664e-7,0.0052577956,0.02377265,0.000010681501,0.16656499,0.067520574,0.00019088249],"about_ca_topic_score_codex":0.00009059177,"about_ca_topic_score_gemma":0.000037722188,"teacher_disagreement_score":0.15435784,"about_ca_system_score_codex":0.000687025,"about_ca_system_score_gemma":0.000041093488,"threshold_uncertainty_score":0.9694406},"labels":[],"label_agreement":null},{"id":"W4366724863","doi":"10.1088/2634-4505/accf33","title":"Policy approaches to mitigate in-use methane emissions from natural gas use as a marine fuel","year":2023,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Maritime Transport Emissions and Efficiency","field":"Environmental Science","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs; Marine Environmental Observation Prediction and Response Network","keywords":"Flexibility (engineering); Climate policy; Methane; Natural gas; Corporate governance; Climate change; Environmental science; Fossil fuel; Greenhouse gas; Environmental resource management; Liquefied natural gas; Environmental economics; Business; Natural resource economics; Economics; Ecology; Waste management; Engineering","score_opus":0.03980073480272496,"score_gpt":0.3006506439794514,"score_spread":0.26084990917672646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366724863","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99460286,0.00002516948,0.0000145048625,0.0031020318,0.00003147563,0.000953597,0.0000881912,0.0000516975,0.0011304457],"genre_scores_gemma":[0.9943668,0.0001358809,0.0005714477,0.0001446478,0.00004262295,0.000091161404,0.00015571211,0.000028126164,0.0044635874],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9961887,0.0003527909,0.0003748548,0.0009870647,0.0009353639,0.0011612208],"domain_scores_gemma":[0.9979731,0.00050665415,0.000035071243,0.0006699458,0.000008862229,0.00080639485],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0010391208,0.00030206778,0.00029337974,0.0003269765,0.00034478752,0.00013023676,0.00040436062,0.00017309056,0.0035886667],"category_scores_gemma":[0.0013747289,0.0002524963,0.000082374856,0.0013631476,0.00092523283,0.0005346876,0.0016084504,0.000851549,0.0001323592],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002334809,0.00019233406,0.92827684,0.000042215794,0.000012283709,0.0001970985,0.0025144415,0.0014929328,0.003107382,0.00026047457,0.0007023484,0.062968194],"study_design_scores_gemma":[0.00037466266,0.00010261317,0.93886286,0.000010728089,0.0000049878245,0.000006911669,0.0020404481,0.0013846672,0.00031717794,0.046545353,0.010090845,0.00025877287],"about_ca_topic_score_codex":0.010677687,"about_ca_topic_score_gemma":0.00042612464,"teacher_disagreement_score":0.06270942,"about_ca_system_score_codex":0.0010338044,"about_ca_system_score_gemma":0.00012270924,"threshold_uncertainty_score":0.9999927},"labels":[],"label_agreement":null},{"id":"W4388620878","doi":"10.1088/2634-4505/ad0c3f","title":"The mid-transition in the electricity sector: impacts of growing wind and solar electricity on generation costs and natural gas generation in Alberta","year":2023,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"Alberta Innovates","keywords":"Electricity generation; Renewable energy; Fossil fuel; Variable renewable energy; Natural resource economics; Electricity; Natural gas; Wind power; Environmental science; Flexibility (engineering); Environmental economics; Economics; Engineering; Electric power system; Waste management; Power (physics)","score_opus":0.0068684157376251295,"score_gpt":0.24055269841107238,"score_spread":0.23368428267344726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388620878","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99860257,0.0003530368,0.00008476397,0.00033247916,0.000034623405,0.00054812705,0.000004891828,0.0000106531525,0.000028881845],"genre_scores_gemma":[0.99911034,0.00069281756,0.000011008495,0.000019696532,0.000053342254,0.000024997411,0.000067557805,0.000012645121,0.0000076203787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998279,0.0005324174,0.00024670293,0.00023681385,0.00033678417,0.0003682901],"domain_scores_gemma":[0.9994034,0.00033821628,0.000025482,0.0001600605,0.000028439566,0.000044395256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001520001,0.00014096574,0.00013349603,0.00021579364,0.0002517087,0.00008389894,0.00007958099,0.00012437586,0.0000023823604],"category_scores_gemma":[0.00032109514,0.000096858916,0.00001757215,0.0005231428,0.00015524054,0.00027357478,0.00002867493,0.0005522187,2.196571e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004019667,0.00011226591,0.12814754,0.00042298064,0.000076783734,0.00003363337,0.016002895,0.49554163,0.30256855,0.0018406229,0.0005169186,0.054334205],"study_design_scores_gemma":[0.00048059627,0.00017999299,0.37090394,0.0000147103465,0.000004908338,0.000011078659,0.0021385031,0.59947705,0.025224678,0.0013481516,0.00007277819,0.00014361096],"about_ca_topic_score_codex":0.0009919326,"about_ca_topic_score_gemma":0.0015570379,"teacher_disagreement_score":0.2773439,"about_ca_system_score_codex":0.00075675815,"about_ca_system_score_gemma":0.000034731536,"threshold_uncertainty_score":0.3949792},"labels":[],"label_agreement":null},{"id":"W4391096344","doi":"10.1088/2634-4505/ad2153","title":"The carbon footprint of future engineered wood construction in Montreal","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Carbon footprint; Footprint; Environmental science; Waste management; Engineering; Greenhouse gas; Geology; Geography; Archaeology; Oceanography","score_opus":0.00467253474728966,"score_gpt":0.26261115019174114,"score_spread":0.25793861544445146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391096344","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99480927,0.0012387481,0.000020619114,0.000768814,0.0001341615,0.0008174824,0.000014325922,0.000023195895,0.0021733867],"genre_scores_gemma":[0.9987919,0.00062153715,0.00011060318,0.0000066905927,0.000067974426,0.00006167034,0.0000060755574,0.000019261335,0.000314299],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9970425,0.0004131087,0.00043239328,0.00059624645,0.0007674015,0.00074839825],"domain_scores_gemma":[0.9988694,0.00034821013,0.000039142564,0.00052449305,0.000008906037,0.00020980353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018365127,0.00024792025,0.00023432166,0.0001083448,0.00026166695,0.00008548498,0.00029632723,0.00018672983,0.0002269974],"category_scores_gemma":[0.0002254301,0.00017605258,0.00008633219,0.00044310448,0.0026024957,0.00015112817,0.0006307016,0.00088935054,0.0000043552086],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002131278,0.00014390607,0.5986136,0.00020559918,0.000029883098,0.00005843766,0.0030774528,0.0012273719,0.00230738,0.0013577479,0.00007055448,0.39269492],"study_design_scores_gemma":[0.00027140533,0.00018739283,0.9251835,0.000010615991,0.000007645078,0.000022582059,0.013123274,0.0019830326,0.001195279,0.051745404,0.0060955063,0.0001744093],"about_ca_topic_score_codex":0.00097406644,"about_ca_topic_score_gemma":0.0003990327,"teacher_disagreement_score":0.39252052,"about_ca_system_score_codex":0.0022094487,"about_ca_system_score_gemma":0.000060366754,"threshold_uncertainty_score":0.9589004},"labels":[],"label_agreement":null},{"id":"W4391464549","doi":"10.1088/2634-4505/ad253e","title":"Variability in costs of electrifying passenger cars in Canada","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Passenger transport; Transport engineering; Aeronautics; Automotive engineering; Engineering","score_opus":0.004228141574996474,"score_gpt":0.2358766494895088,"score_spread":0.2316485079145123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391464549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9968951,0.0019038005,0.00008175895,0.0001027904,0.00006890637,0.00042263462,0.000028650673,0.000019521274,0.00047688137],"genre_scores_gemma":[0.9995117,0.00033692876,0.000050761075,0.000009031682,0.000025068162,0.00002683088,0.000008334671,0.000021237982,0.000010077234],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99785054,0.00028458767,0.00038397394,0.00037105242,0.0004470298,0.0006627907],"domain_scores_gemma":[0.99909574,0.0004909111,0.000011871763,0.00025857062,0.000019313193,0.00012358243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013281434,0.00018201685,0.00026466238,0.0002469592,0.000041743806,0.000030015128,0.00015926323,0.00013430233,0.00013405627],"category_scores_gemma":[0.00021398267,0.00016923399,0.00003159561,0.00066976633,0.0001672867,0.00017050476,0.00009160696,0.0012211322,3.5698747e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034650642,0.000024490215,0.74914104,0.00069335196,0.000023059687,0.00013274091,0.00068455643,0.008715291,0.0037464523,0.00077788293,0.00036046788,0.23566599],"study_design_scores_gemma":[0.00024141386,0.000051936262,0.9342195,0.000045049637,0.0000031920274,0.000011713066,0.0017203784,0.039971408,0.0023989838,0.01976522,0.0013852974,0.0001859505],"about_ca_topic_score_codex":0.1166076,"about_ca_topic_score_gemma":0.12950008,"teacher_disagreement_score":0.23548004,"about_ca_system_score_codex":0.0074032005,"about_ca_system_score_gemma":0.0008276606,"threshold_uncertainty_score":0.9964072},"labels":[],"label_agreement":null},{"id":"W4391846183","doi":"10.1088/2634-4505/ad29d2","title":"Whole value at risk for flood damage estimates through spatial data analysis","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Flood Risk Assessment and Management","field":"Environmental Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Flood myth; Value (mathematics); Environmental science; Statistics; Geography; Econometrics; Mathematics","score_opus":0.017527329862903004,"score_gpt":0.3433642667615613,"score_spread":0.3258369368986583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391846183","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9585111,0.00063059275,0.035738695,0.0010529766,0.00012595663,0.0017559922,0.0009975142,0.00008283631,0.0011043398],"genre_scores_gemma":[0.9911529,0.00033680347,0.00608603,0.000039902894,0.00009130191,0.00011750773,0.00080532965,0.000030473302,0.0013397841],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99632454,0.00027480858,0.00032154054,0.0013763543,0.0008993313,0.00080343895],"domain_scores_gemma":[0.9979826,0.0004886107,0.000049558752,0.0012635296,0.000008720375,0.00020693276],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0020230638,0.0002894924,0.00030112694,0.00012943633,0.0008415754,0.0002583161,0.00070781977,0.00012763542,0.0021446766],"category_scores_gemma":[0.00030760543,0.0002360186,0.00013193302,0.0005467128,0.0010886679,0.00076797657,0.0039478913,0.00046681068,0.000063455926],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019936846,0.0002835276,0.89551294,0.0003311972,0.00078785507,0.00006019059,0.0017018303,0.012733183,0.00074856856,0.0007557002,0.021427052,0.065458596],"study_design_scores_gemma":[0.0003751385,0.00022030392,0.6556409,0.000005540271,0.00045382648,0.0000018696932,0.00132635,0.1534754,0.00026343812,0.05974342,0.12820578,0.00028801901],"about_ca_topic_score_codex":0.0017405138,"about_ca_topic_score_gemma":0.00056894694,"teacher_disagreement_score":0.23987202,"about_ca_system_score_codex":0.0013495908,"about_ca_system_score_gemma":0.000043988213,"threshold_uncertainty_score":0.9987675},"labels":[],"label_agreement":null},{"id":"W4396937610","doi":"10.1088/2634-4505/ad397e","title":"Are vehicle lifespan caps an effective and efficient method for reducing US light-duty vehicle fleet GHG emissions?","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Saudi Aramco; University of Toronto; Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs","keywords":"Greenhouse gas; Life-cycle assessment; Software deployment; Occupancy; Automotive engineering; Electric vehicle; Work (physics); Market penetration; Environmental economics; Environmental science; Engineering; Production (economics); Economics","score_opus":0.007475446528370366,"score_gpt":0.29721067717240457,"score_spread":0.2897352306440342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396937610","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99226004,0.0034638897,0.0019403908,0.00039217426,0.00013164376,0.0014487135,0.00009835234,0.00016828068,0.00009652172],"genre_scores_gemma":[0.997946,0.000113076414,0.0013163385,0.000044819157,0.00023775306,0.00016956833,0.000020912257,0.00006890279,0.00008259582],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9971478,0.00034271958,0.0003186831,0.000827598,0.00046053363,0.00090267666],"domain_scores_gemma":[0.99845445,0.000515581,0.000035116864,0.0004291854,0.000057484922,0.00050818996],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013445662,0.00035512034,0.00035798328,0.00022163248,0.0005849011,0.00025364582,0.00019845233,0.00029651864,0.00007326999],"category_scores_gemma":[0.00031927397,0.00029841426,0.00008955693,0.0003542623,0.0002809264,0.00028090432,0.00022008028,0.0010754091,0.0000018484702],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035057927,0.00018076351,0.03992115,0.002902882,0.00019191497,0.00011381145,0.0058496254,0.03158024,0.100095525,0.00054971216,0.0033332955,0.8149305],"study_design_scores_gemma":[0.0008121051,0.00053799374,0.54366,0.000094027004,0.0000452945,0.000056008746,0.0043043825,0.39687318,0.023946194,0.016055316,0.013082468,0.0005330656],"about_ca_topic_score_codex":0.000045431105,"about_ca_topic_score_gemma":0.0000066009648,"teacher_disagreement_score":0.81439745,"about_ca_system_score_codex":0.0009498515,"about_ca_system_score_gemma":0.000068793044,"threshold_uncertainty_score":0.9999468},"labels":[],"label_agreement":null},{"id":"W4399370191","doi":"10.1088/2634-4505/ad546a","title":"Mapping construction sector greenhouse gas emissions: a crucial step in sustainably meeting increasing housing demands","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo; University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; University of Toronto; Cement Association of Canada","keywords":"Greenhouse gas; Sustainability; Natural resource economics; Business; Environmental economics; Environmental resource management; Environmental planning; Environmental science; Economics; Ecology","score_opus":0.011837407268674,"score_gpt":0.28822075713100165,"score_spread":0.27638334986232765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399370191","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99470246,0.0007458734,0.00055111974,0.0005397219,0.000120041484,0.0014381097,0.000021949229,0.00012707918,0.0017536327],"genre_scores_gemma":[0.997398,0.00028037836,0.0017230717,0.00005683141,0.00014296026,0.00008867766,0.00002091861,0.000070125774,0.00021900101],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9935902,0.0012952292,0.00077566836,0.0014053757,0.0012491102,0.0016844426],"domain_scores_gemma":[0.9980569,0.0006343347,0.00008614477,0.0006191568,0.00001850012,0.00058496435],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0046644127,0.00052334124,0.00047319004,0.00047827006,0.0009823899,0.00039156256,0.0003773303,0.00037246264,0.0015524471],"category_scores_gemma":[0.0013503447,0.000485503,0.00015078671,0.0011239317,0.0026810425,0.0012155639,0.001490238,0.0016037793,0.000022170616],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023773471,0.00017254672,0.87505496,0.00043363817,0.000023014509,0.00037161808,0.004189043,0.00067032385,0.0023246713,0.00018056788,0.00018803627,0.116153836],"study_design_scores_gemma":[0.0008380411,0.00031518677,0.8814889,0.00016560538,0.000018897712,0.00017537168,0.05191811,0.008091548,0.00049251365,0.044186175,0.011586399,0.00072322955],"about_ca_topic_score_codex":0.0020248867,"about_ca_topic_score_gemma":0.00018582233,"teacher_disagreement_score":0.11543061,"about_ca_system_score_codex":0.008174938,"about_ca_system_score_gemma":0.00021733681,"threshold_uncertainty_score":0.9997597},"labels":[],"label_agreement":null},{"id":"W4399723469","doi":"10.1088/2634-4505/ad590a","title":"Sufficiency of level 1 charging to meet electric vehicle charging requirements","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"Alberta Innovates","keywords":"Electric vehicle; Automotive engineering; Electrical engineering; Aeronautics; Engineering; Power (physics); Physics","score_opus":0.01675345730154193,"score_gpt":0.2875327939933004,"score_spread":0.27077933669175847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399723469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9940807,0.0024974549,0.0012191238,0.00025088398,0.000111747155,0.00060094055,0.000047611073,0.00010901519,0.0010825094],"genre_scores_gemma":[0.9992399,0.00021142085,0.00020506521,0.000029807414,0.00010317027,0.000034737513,0.000008059597,0.00004470008,0.00012314592],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99737924,0.00010618502,0.00037753384,0.0005033992,0.0007203095,0.00091330527],"domain_scores_gemma":[0.9991675,0.00014151476,0.000018812392,0.0003533891,0.00004594991,0.00027284623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094618305,0.0002552677,0.00026928392,0.0004617184,0.00021834222,0.00010240228,0.00028637616,0.00014248291,0.00024000446],"category_scores_gemma":[0.00014827582,0.00023058677,0.000072559116,0.0009543702,0.00018041521,0.00030230076,0.00021405594,0.00057914894,0.000006684731],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011672028,0.00012148113,0.05541002,0.0024007913,0.00018498763,0.00010095006,0.0066014566,0.007281178,0.48617518,0.010359901,0.0063797277,0.4248676],"study_design_scores_gemma":[0.000908942,0.0012627552,0.61854935,0.00022304949,0.000050709776,0.00006992853,0.005359045,0.14929247,0.12250635,0.074174546,0.02633691,0.0012659562],"about_ca_topic_score_codex":0.000022191922,"about_ca_topic_score_gemma":0.0000027252001,"teacher_disagreement_score":0.5631393,"about_ca_system_score_codex":0.0010379339,"about_ca_system_score_gemma":0.000109637636,"threshold_uncertainty_score":0.94030553},"labels":[],"label_agreement":null},{"id":"W4401351813","doi":"10.1088/2634-4505/ad6bbf","title":"Scaling traffic variables from sensors sample to the entire city at high spatiotemporal resolution with machine learning: applications to the Paris megacity","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Traffic Prediction and Management Techniques","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"Grantham Foundation for the Protection of the Environment","keywords":"Megacity; Scaling; Sample (material); Mega-; Computer science; Environmental science; Artificial intelligence; Mathematics; Economics","score_opus":0.008590381426996937,"score_gpt":0.24790481861439945,"score_spread":0.2393144371874025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401351813","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84381664,0.00040056714,0.14999673,0.0028516992,0.000058145073,0.0017493955,0.00027748852,0.00073672395,0.00011262391],"genre_scores_gemma":[0.99795717,0.0001763429,0.0010792707,0.000045040983,0.00010740238,0.00032359755,0.00014293003,0.000023495217,0.00014476987],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99832904,0.00021191225,0.00018571343,0.00041609447,0.00048598036,0.00037125347],"domain_scores_gemma":[0.999063,0.00033917392,0.000013315726,0.000402795,0.000020880849,0.00016080975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089448143,0.00017261045,0.00012565918,0.00010262928,0.00070064195,0.00017529725,0.0002272709,0.00008175745,0.00013126637],"category_scores_gemma":[0.000110072135,0.000107557826,0.000036047495,0.00036200564,0.00021857028,0.00011450522,0.00031458575,0.00063352863,0.000007316133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025254802,0.00008405195,0.0294863,0.0002841039,0.00020798582,0.000013405996,0.0056324475,0.6917317,0.00031122877,0.00228984,0.030535521,0.23917091],"study_design_scores_gemma":[0.00014814566,0.00013478796,0.12320822,0.000019648684,0.000031008178,0.000003550403,0.0021088645,0.19238918,0.00037674294,0.0019094065,0.6794508,0.00021966138],"about_ca_topic_score_codex":0.00061574037,"about_ca_topic_score_gemma":0.00029414467,"teacher_disagreement_score":0.6489153,"about_ca_system_score_codex":0.0008214389,"about_ca_system_score_gemma":0.000026495232,"threshold_uncertainty_score":0.5388842},"labels":[],"label_agreement":null},{"id":"W4402119872","doi":"10.1088/2634-4505/ad763f","title":"Plug-in charging or electric roads? Powering U.S. long-haul heavy-duty trucks in 2050","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs","keywords":"Truck; Heavy duty; Automotive engineering; Environmental science; Plug-in; Electric cars; Transport engineering; Aeronautics; Engineering; Electrical engineering; Computer science","score_opus":0.006855543010833948,"score_gpt":0.27005975467274324,"score_spread":0.26320421166190927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402119872","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9915159,0.00631221,0.00025589924,0.00023684459,0.00013222116,0.00074567343,0.000017656848,0.00013020542,0.0006534384],"genre_scores_gemma":[0.99805737,0.0013239078,0.00007911197,0.000027536727,0.00013163353,0.0000500203,0.00002482444,0.00006610401,0.00023946771],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99659294,0.00019137071,0.0005074453,0.00072177127,0.0005998296,0.0013866456],"domain_scores_gemma":[0.99906516,0.0002577618,0.000017778404,0.00038751835,0.000018136474,0.00025362763],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011459708,0.00038141588,0.0003951334,0.00077402964,0.00015390513,0.00020680465,0.00029618214,0.0003070865,0.00058370834],"category_scores_gemma":[0.00017126268,0.00032307068,0.00007753212,0.0013476479,0.00021445868,0.0005003417,0.00020800372,0.0021584241,0.000010572594],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005512781,0.00014422578,0.35090828,0.002449597,0.000098542725,0.0020899829,0.0045278035,0.026761657,0.0074186292,0.0008298283,0.0014122074,0.602808],"study_design_scores_gemma":[0.0007350482,0.00027863868,0.89645404,0.00011142392,0.0000075820726,0.0001354769,0.0018006968,0.07180429,0.0017812855,0.019014297,0.0073089595,0.00056826917],"about_ca_topic_score_codex":0.000103124185,"about_ca_topic_score_gemma":0.00010692424,"teacher_disagreement_score":0.6022397,"about_ca_system_score_codex":0.0027835693,"about_ca_system_score_gemma":0.00015895424,"threshold_uncertainty_score":0.99992216},"labels":[],"label_agreement":null},{"id":"W4402121163","doi":"10.1088/2634-4505/ad763e","title":"Decision support for United States—Canada energy integration is impaired by fragmentary environmental and electricity system modeling capacity","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"U.S. Environmental Protection Agency","keywords":"Electricity; Electricity system; Energy system; Energy (signal processing); Environmental science; Environmental resource management; Engineering; Electricity generation; Renewable energy; Electrical engineering; Mathematics; Physics; Power (physics)","score_opus":0.005190975400569775,"score_gpt":0.21742769800368938,"score_spread":0.2122367226031196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402121163","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82073957,0.000946194,0.17661765,0.00007883418,0.00013750915,0.0005620106,0.0007722698,0.00010521758,0.000040767132],"genre_scores_gemma":[0.99746716,0.00053513935,0.0004984995,0.00004384321,0.000048517737,0.00012525103,0.0011284102,0.000056209192,0.00009699601],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976935,0.00015306118,0.0004262546,0.00055549905,0.00057825784,0.00059342827],"domain_scores_gemma":[0.9992225,0.00022804833,0.00002392564,0.00025156862,0.000035421355,0.00023850628],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006061255,0.00031892376,0.00025427665,0.00024757918,0.00032481176,0.00015027929,0.0001305525,0.00021616646,0.000070068105],"category_scores_gemma":[0.00004019595,0.00028953777,0.00004869752,0.00023143958,0.00016924286,0.0003265344,0.00008962936,0.00046617395,6.232559e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071118586,0.00017051713,0.004792396,0.0028471798,0.0006064768,0.00009425778,0.0052414946,0.6913456,0.022854293,0.002101578,0.04724417,0.22199088],"study_design_scores_gemma":[0.0002849636,0.0001454513,0.00032450716,0.00003778056,0.00001773558,0.00002376189,0.0049208947,0.9795667,0.0049306974,0.0024081273,0.007081481,0.00025792373],"about_ca_topic_score_codex":0.028049788,"about_ca_topic_score_gemma":0.0023707775,"teacher_disagreement_score":0.2882211,"about_ca_system_score_codex":0.004859906,"about_ca_system_score_gemma":0.00012844679,"threshold_uncertainty_score":0.99995565},"labels":[],"label_agreement":null},{"id":"W4404130236","doi":"10.1088/2634-4505/ad8fce","title":"Causal inference to scope environmental impact assessment of renewable energy projects and test competing mental models of decarbonization","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Social Acceptance of Renewable Energy","field":"Social Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Dartmouth College; U.S. Environmental Protection Agency","keywords":"Renewable energy; Scope (computer science); Inference; Test (biology); Causal inference; Psychology; Environmental economics; Economics; Engineering; Computer science; Ecology; Econometrics; Artificial intelligence","score_opus":0.018360691661389032,"score_gpt":0.3672614548472787,"score_spread":0.34890076318588964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404130236","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958417,0.0011508415,0.00072083715,0.0001602985,0.000058232952,0.00058210356,0.00008303059,0.000021748967,0.0013812511],"genre_scores_gemma":[0.9974282,0.0015246038,0.0006637148,0.00001149334,0.000074636715,0.00004188903,0.00002906398,0.000020833182,0.00020556657],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99701923,0.0004619652,0.00035343357,0.0005240594,0.0010680214,0.0005732748],"domain_scores_gemma":[0.99858105,0.0007748856,0.0000764292,0.00022174597,0.00004700891,0.0002988867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001404431,0.00020020049,0.0003032823,0.0002301861,0.0004538331,0.00011700467,0.00022426217,0.00015229595,0.00020455783],"category_scores_gemma":[0.0005677183,0.00018551297,0.000059756883,0.00044883834,0.0015074691,0.000512678,0.0004669188,0.00023484716,2.0846379e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009881157,0.00032934375,0.8312409,0.0003254087,0.000094862036,0.00001788497,0.03580428,0.0136295445,0.02482014,0.006579033,0.00024782083,0.08681199],"study_design_scores_gemma":[0.00091295864,0.0018378102,0.6685004,0.00030131533,0.00005257554,0.0000078003395,0.22779249,0.02530082,0.01102627,0.060652673,0.002799965,0.0008149225],"about_ca_topic_score_codex":0.013928789,"about_ca_topic_score_gemma":0.0015038543,"teacher_disagreement_score":0.1919882,"about_ca_system_score_codex":0.0019387375,"about_ca_system_score_gemma":0.0007778583,"threshold_uncertainty_score":0.9926375},"labels":[],"label_agreement":null},{"id":"W4404130608","doi":"10.1088/2634-4505/ad8fcc","title":"Climate change, mass casualty incidents, and emergency response in the Arctic","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Disaster Management and Resilience","field":"Social Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Northern British Columbia; Pacific Institute for Climate Solutions","funders":"UK Research and Innovation","keywords":"Emergency response; Mass Casualty; Mass-casualty incident; Arctic; The arctic; Climate change; Aeronautics; Disaster response; Medical emergency; Emergency management; Engineering; Poison control; Suicide prevention; Medicine; Political science; Oceanography; Geology","score_opus":0.024587966773150643,"score_gpt":0.37245053941792367,"score_spread":0.34786257264477305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404130608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9909041,0.0015919332,0.000009305693,0.004894753,0.00010100302,0.00088037085,0.000009138942,0.000016268503,0.0015931485],"genre_scores_gemma":[0.9958866,0.003278494,0.000012876828,0.00005080753,0.00009559452,0.00009028287,0.0000024679682,0.000007181107,0.0005756635],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99649143,0.0015447013,0.00017823165,0.00040277964,0.0007591191,0.00062373787],"domain_scores_gemma":[0.9992449,0.00037684466,0.000016526574,0.00022145169,0.000016664408,0.00012360193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059905653,0.00011455222,0.00009980246,0.000165187,0.00067569956,0.00023178346,0.00028116768,0.00007931143,0.00026380373],"category_scores_gemma":[0.0005124769,0.00008002162,0.000029418421,0.00041533957,0.0012534601,0.0004430923,0.00031036104,0.00044405076,0.000006683786],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039879975,0.00008103787,0.7443231,0.000506368,0.000012224492,0.00026515743,0.14152151,0.0000042376214,0.00009496524,0.017200623,0.0005671687,0.09502484],"study_design_scores_gemma":[0.00008129362,0.000088969515,0.8020878,0.00001816421,0.0000044339454,0.0000021398678,0.11832342,0.00007164431,0.0000016984404,0.05928866,0.01994636,0.000085425745],"about_ca_topic_score_codex":0.00048330578,"about_ca_topic_score_gemma":0.0002490744,"teacher_disagreement_score":0.09493942,"about_ca_system_score_codex":0.0004314506,"about_ca_system_score_gemma":0.00006430008,"threshold_uncertainty_score":0.5197003},"labels":[],"label_agreement":null},{"id":"W4404591529","doi":"10.1088/2634-4505/ad951f","title":"Urban scaling of water and electricity demand across the United States","year":2024,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Impact of Light on Environment and Health","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"United Nations University Institute for Water, Environment, and Health","funders":"","keywords":"Electricity demand; Scaling; Electricity; Environmental science; Electricity generation; Mathematics; Power (physics); Engineering; Physics","score_opus":0.010578748069769729,"score_gpt":0.3142495654687169,"score_spread":0.3036708173989472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404591529","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9960587,0.00070131646,0.0001760669,0.0023022857,0.000027668497,0.00053982256,0.000027383252,0.000020381643,0.00014639659],"genre_scores_gemma":[0.998515,0.0008614201,0.000036627956,0.00014097476,0.000039313436,0.000017939987,0.000039443898,0.000017592396,0.00033165346],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9972103,0.00038158317,0.00028975873,0.00047989294,0.0006793397,0.00095912855],"domain_scores_gemma":[0.99900293,0.00033824498,0.00002714197,0.00031133808,0.0000059548115,0.0003143929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029898863,0.00019759845,0.00018982672,0.00007810085,0.0007130534,0.0001161727,0.00021264385,0.00011575109,0.0008215975],"category_scores_gemma":[0.00011477238,0.00011098311,0.000045421417,0.00026153348,0.002540813,0.00025655192,0.00071600435,0.0006453104,0.000011457512],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016352283,0.00010616616,0.9432911,0.00035309908,0.00004057587,0.000028060482,0.026187917,0.00042441778,0.0046496848,0.00021691858,0.0018072132,0.022731276],"study_design_scores_gemma":[0.00027288916,0.00028948966,0.8920639,0.000011219465,0.000013884029,0.000023075143,0.0071976962,0.0029384217,0.005123558,0.02163482,0.070230946,0.00020005443],"about_ca_topic_score_codex":0.0005107627,"about_ca_topic_score_gemma":0.0000144976775,"teacher_disagreement_score":0.06842373,"about_ca_system_score_codex":0.0007547221,"about_ca_system_score_gemma":0.000027377078,"threshold_uncertainty_score":0.93617314},"labels":[],"label_agreement":null},{"id":"W4405357053","doi":"10.1088/2634-4505/ad9ed7","title":"Technology first, sustainability later: a systematic review on the literature on the policy development of China’s smart city strategy","year":2024,"lang":"en","type":"review","venue":"Environmental Research Infrastructure and Sustainability","topic":"Smart Cities and Technologies","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Sustainability; Smart growth; Urban sustainability; Systematic review; Political science; Business; Engineering ethics; Economic growth; Engineering; Economics; Urban planning; MEDLINE; Civil engineering","score_opus":0.018233229342205226,"score_gpt":0.3051257041782857,"score_spread":0.2868924748360805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405357053","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004543697,0.98530227,0.0000042264896,0.0027196135,0.000060172806,0.006798836,0.0001415721,0.00017156528,0.00025801858],"genre_scores_gemma":[0.09884098,0.8991122,0.000010101006,0.00003165844,0.000045133904,0.0016315237,0.000033546956,0.00006245211,0.00023238889],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9958195,0.00063428003,0.0010987864,0.00072944193,0.00081973756,0.00089822285],"domain_scores_gemma":[0.9968408,0.0009315502,0.00015685853,0.0018737288,0.00009050548,0.00010660453],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0027621877,0.0007917318,0.0017718581,0.0005960202,0.0005521327,0.00016618552,0.0011697942,0.000708449,0.000084465246],"category_scores_gemma":[0.002779391,0.0003699105,0.0003670943,0.0014624243,0.001470778,0.00007378982,0.000939904,0.0034362695,0.000010356968],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007752112,0.000051155355,0.00003575176,0.8944353,0.000309182,0.00003059126,0.0005427867,0.000014121477,1.07149845e-7,0.008234302,0.001246947,0.095092006],"study_design_scores_gemma":[0.00016954138,0.0006156477,0.00087334274,0.3101591,0.00070265145,0.00010951033,0.008274157,0.000056421966,0.000039271432,0.14790222,0.52989626,0.001201885],"about_ca_topic_score_codex":0.000012246007,"about_ca_topic_score_gemma":0.000007262383,"teacher_disagreement_score":0.5842762,"about_ca_system_score_codex":0.003382225,"about_ca_system_score_gemma":0.00063717965,"threshold_uncertainty_score":0.9998753},"labels":[],"label_agreement":null},{"id":"W4406444180","doi":"10.1088/2634-4505/adab17","title":"Barriers and drivers of near-term climate change mitigation: a Canadian case study","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Climate Change Policy and Economics","field":"Economics, Econometrics and Finance","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"Canada Research Chairs; Royal Academy of Engineering","keywords":"Term (time); Climate change; Environmental resource management; Environmental planning; Environmental science; Business; Geography; Oceanography; Geology","score_opus":0.03470110793423108,"score_gpt":0.30441179356949916,"score_spread":0.26971068563526807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406444180","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99618906,0.0005400548,0.0000032871342,0.0008229878,0.000056680223,0.00085012295,0.00047772276,0.0000054911366,0.001054619],"genre_scores_gemma":[0.9992361,0.00044712832,0.00003112161,0.00012025238,0.000026203352,0.00006994678,0.000010742167,0.000009349053,0.000049163227],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985872,0.000067097666,0.000356288,0.00043673642,0.00004460276,0.0005080884],"domain_scores_gemma":[0.9991794,0.00008716843,0.000071515824,0.0003079401,0.000018087581,0.00033588815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010468471,0.0001376502,0.00028526827,0.0003150576,0.00056853326,0.00008931588,0.0001152009,0.00011184654,0.00030604287],"category_scores_gemma":[0.00018576466,0.00015955028,0.000038900438,0.00017165777,0.0007569343,0.00022640357,0.00026816668,0.0002651917,0.0000033201547],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020865831,0.000027361213,0.9811694,0.00014140713,0.000027051648,0.000095860414,0.009005549,0.0000036363263,0.0000013477356,0.0057861577,0.000036589427,0.0036847456],"study_design_scores_gemma":[0.0006397845,0.00016560979,0.90016645,0.00000795636,0.00000724134,0.000040414543,0.06144276,0.00048791023,0.00000865272,0.034724,0.0021550762,0.0001541693],"about_ca_topic_score_codex":0.031017577,"about_ca_topic_score_gemma":0.010538336,"teacher_disagreement_score":0.081003,"about_ca_system_score_codex":0.000756552,"about_ca_system_score_gemma":0.000097579126,"threshold_uncertainty_score":0.97543496},"labels":[],"label_agreement":null},{"id":"W4406717443","doi":"10.1088/2634-4505/adad12","title":"Ensemble modeling of the climate-energy nexus for renewable energy generation across multiple US states","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"United Nations University Institute for Water, Environment, and Health","funders":"","keywords":"Renewable energy; Nexus (standard); Energy (signal processing); Climate change; Climate model; Environmental science; Natural resource economics; Economics; Computer science; Physics; Geology; Engineering","score_opus":0.009231588422718196,"score_gpt":0.26273705429451155,"score_spread":0.25350546587179335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406717443","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72679836,0.0005605728,0.2713234,0.00005671295,0.00022780361,0.000391737,0.00010187968,0.000041870724,0.0004976749],"genre_scores_gemma":[0.9985758,0.00023039276,0.00043171705,0.000023552198,0.00004556425,0.0001559497,0.00010943543,0.000024353578,0.0004032116],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841416,0.00015709961,0.00034658774,0.00029311355,0.00026232714,0.0005267366],"domain_scores_gemma":[0.9992462,0.00013506933,0.000033675136,0.00037879334,0.0001468212,0.00005944522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054609333,0.00017217288,0.00019655586,0.00008507862,0.00043198222,0.00006257066,0.00018609624,0.00017671147,0.000009178372],"category_scores_gemma":[0.0001792435,0.00013548878,0.00006471244,0.00024661003,0.0002078255,0.0001645143,0.00017702709,0.00017519362,7.482583e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048735244,0.000019707479,0.0048276763,0.00017253427,0.000028343436,3.6921122e-7,0.00027759562,0.9847081,0.005687549,0.00093445904,0.0004414774,0.0028534997],"study_design_scores_gemma":[0.00034295517,0.000037861508,0.0009866289,0.0000156426,0.0000062101562,0.0000010276175,0.0024598935,0.95383304,0.027997622,0.011235369,0.002978781,0.00010498342],"about_ca_topic_score_codex":0.0017278361,"about_ca_topic_score_gemma":0.0009542805,"teacher_disagreement_score":0.27177748,"about_ca_system_score_codex":0.00071422505,"about_ca_system_score_gemma":0.00007457824,"threshold_uncertainty_score":0.5525072},"labels":[],"label_agreement":null},{"id":"W4408434959","doi":"10.1088/2634-4505/adc0bc","title":"Sectoral investments to achieve water, energy and land SDG under climate change uncertainty","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Water-Energy-Food Nexus Studies","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Horizon 2020 Framework Programme; International Institute for Applied Systems Analysis; European Commission","keywords":"Climate change; Natural resource economics; Environmental science; Energy (signal processing); Land use, land-use change and forestry; Water-energy nexus; Water resource management; Economics; Environmental resource management; Climatology; Business; Land use; Computer science; Geology; Mathematics; Oceanography; Civil engineering; Engineering; Statistics","score_opus":0.01601224408109569,"score_gpt":0.2896565477954352,"score_spread":0.2736443037143395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408434959","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9910987,0.00025737315,0.00008335545,0.0034198258,0.000080416365,0.00058419415,0.00008319079,0.000032278756,0.0043606567],"genre_scores_gemma":[0.9973997,0.00016554278,0.00009301653,0.0012189985,0.00005052676,0.00020481845,0.000031975615,0.000020463513,0.0008149639],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9966467,0.0004109159,0.00027525675,0.0008985496,0.00060787593,0.0011606888],"domain_scores_gemma":[0.99900067,0.00011739748,0.000027377384,0.0004532642,0.000014213723,0.0003870642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007116748,0.0003342007,0.000307401,0.00014968579,0.0007908677,0.00008767059,0.00027728628,0.00015803656,0.00029959768],"category_scores_gemma":[0.0000643527,0.0002441934,0.000045956655,0.00025620186,0.0013426992,0.000301999,0.003162255,0.00029368803,0.000009859038],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011963553,0.0004372293,0.8729197,0.00026773522,0.0001550276,0.00007889478,0.004523906,0.0010795414,0.0071017975,0.021425527,0.0031799683,0.08763435],"study_design_scores_gemma":[0.00061266025,0.00039524978,0.62380195,0.000014216745,0.000014295158,0.0000059058493,0.002214671,0.00021982523,0.0019622706,0.35475662,0.015708031,0.0002942702],"about_ca_topic_score_codex":0.0022980424,"about_ca_topic_score_gemma":0.00084009505,"teacher_disagreement_score":0.3333311,"about_ca_system_score_codex":0.0013985408,"about_ca_system_score_gemma":0.000021569087,"threshold_uncertainty_score":0.99579173},"labels":[],"label_agreement":null},{"id":"W4408701800","doi":"10.1088/2634-4505/adc3bc","title":"Convenience over control: qualitative insights from water system users in a rural setting in Gujarat, India","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Water resources management and optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centre for Global Health Research; Hudbay Minerals (Canada)","funders":"","keywords":"Qualitative research; Control (management); Geography; Environmental planning; Computer science; Sociology; Social science; Artificial intelligence","score_opus":0.0038418506844842626,"score_gpt":0.2550893814422053,"score_spread":0.251247530757721,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408701800","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976198,0.00020567185,0.00074846676,0.00007701056,0.000044870754,0.0007122195,0.000013811483,0.0000324513,0.00054570223],"genre_scores_gemma":[0.9996961,0.000019774254,0.000068299836,0.000023485763,0.000014645684,0.000067880814,0.000040303163,0.000011149283,0.0000583943],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99823445,0.00045237233,0.00030586688,0.00028221836,0.0002752746,0.00044984612],"domain_scores_gemma":[0.99953336,0.00018400302,0.00001546938,0.00019186936,0.0000124636845,0.00006285014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061685464,0.00016306994,0.00021389735,0.00033552558,0.0000959298,0.000070489674,0.00014588138,0.00011030541,0.000034593057],"category_scores_gemma":[0.00005915337,0.00013095504,0.000025578167,0.00022839243,0.00024561715,0.00028827213,0.00017391052,0.00044263108,0.0000023175126],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026754529,0.00005198728,0.86684376,0.0006392562,0.000060546354,0.00007811961,0.05990301,0.06610976,0.0015571091,0.001138207,0.000100010824,0.0032506904],"study_design_scores_gemma":[0.0015895802,0.000034449546,0.8436786,0.00007202355,0.0000057495104,2.8902616e-7,0.07950498,0.065180525,0.0006948424,0.008503818,0.0005474223,0.0001877253],"about_ca_topic_score_codex":0.0002655872,"about_ca_topic_score_gemma":0.00005406497,"teacher_disagreement_score":0.023165166,"about_ca_system_score_codex":0.0012248547,"about_ca_system_score_gemma":0.00001777239,"threshold_uncertainty_score":0.5340192},"labels":[],"label_agreement":null},{"id":"W4410980574","doi":"10.1088/2634-4505/ade004","title":"A multi period community energy system optimization model for Arctic and Northern communities considering both thermal and electric loads","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Carleton University","keywords":"Arctic; Period (music); Energy system; Environmental science; The arctic; Energy (signal processing); Thermal; Climatology; Geography; Meteorology; Oceanography; Geology; Physics; Mathematics; Statistics","score_opus":0.010552249284287408,"score_gpt":0.244200892428393,"score_spread":0.23364864314410558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410980574","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77689797,0.000753427,0.22164792,0.000031185842,0.00002402951,0.0004517722,0.000017374845,0.00006913009,0.000107190885],"genre_scores_gemma":[0.9966623,0.00017160396,0.0028442594,0.000013834044,0.000010662075,0.00014778381,0.000038738715,0.000029034129,0.00008173853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986252,0.0004209422,0.00024820116,0.00017861665,0.00015261432,0.00037441426],"domain_scores_gemma":[0.99924374,0.0002546511,0.000027172096,0.000300637,0.00008451944,0.00008927962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064970757,0.00020755232,0.00023334395,0.00020182603,0.00077817944,0.00012572925,0.000116745105,0.00016875597,0.000003725213],"category_scores_gemma":[0.0001025521,0.0001985243,0.000025588028,0.0001413524,0.0003168545,0.00019295402,0.00017368083,0.00051391165,4.0638884e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005984612,0.000024025836,0.017765395,0.0009968186,0.00005396862,0.0000012024478,0.0035786526,0.9728883,0.00072900805,0.0006150902,0.000006547906,0.003281161],"study_design_scores_gemma":[0.0005109055,0.000059022255,0.0074805007,0.000047144174,0.000014608319,0.000011027288,0.027111413,0.9638077,0.00016632827,0.00061454036,0.0000310692,0.00014574603],"about_ca_topic_score_codex":0.0007228773,"about_ca_topic_score_gemma":0.00036611554,"teacher_disagreement_score":0.21976438,"about_ca_system_score_codex":0.0009425335,"about_ca_system_score_gemma":0.000076010634,"threshold_uncertainty_score":0.80955863},"labels":[],"label_agreement":null},{"id":"W4413049316","doi":"10.1088/2634-4505/adf87f","title":"Analyzing meteorological risks to highway infrastructure in Saskatchewan","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Regina","funders":"Faculty of Graduate Studies and Research, University of Regina","keywords":"Environmental science; Transport engineering; Environmental planning; Environmental resource management; Engineering","score_opus":0.010341330259898121,"score_gpt":0.29455744605001233,"score_spread":0.2842161157901142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413049316","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98933065,0.00063378335,0.005107823,0.0007533379,0.00017818031,0.0012930512,0.00003262259,0.00015492752,0.0025156222],"genre_scores_gemma":[0.9981654,0.000107378306,0.0010264243,0.00018732592,0.00007230557,0.0001382933,0.000022711813,0.0000341339,0.00024600932],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99583447,0.00051390356,0.0006850151,0.0009628134,0.0005626436,0.0014411358],"domain_scores_gemma":[0.9981316,0.0004676152,0.000030453795,0.0008372573,0.00009259428,0.00044050952],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0016603767,0.00050634064,0.0006190001,0.00085270737,0.00038951176,0.00018107994,0.0005490411,0.0005025432,0.0004112112],"category_scores_gemma":[0.0007114456,0.00045330173,0.00011903194,0.0013539845,0.00082094996,0.00037078033,0.0006783553,0.0019110283,0.000005092823],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029372005,0.00011008549,0.76319295,0.0005761775,0.000106248954,0.00007981341,0.0029536837,0.029970108,0.0022587029,0.0020765588,0.0037198025,0.19466217],"study_design_scores_gemma":[0.0005211893,0.00013863873,0.77892125,0.00001599527,0.000012159003,0.000006113429,0.013166712,0.0015341138,0.0005698065,0.19127066,0.013499832,0.00034353117],"about_ca_topic_score_codex":0.00018115928,"about_ca_topic_score_gemma":0.00020561047,"teacher_disagreement_score":0.19431864,"about_ca_system_score_codex":0.0033547853,"about_ca_system_score_gemma":0.00030435025,"threshold_uncertainty_score":0.99979186},"labels":[],"label_agreement":null},{"id":"W4413274511","doi":"10.1088/2634-4505/adfc95","title":"Leveraging building permit data for large-scale embodied carbon assessment of residential building construction","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Scale (ratio); Embodied cognition; Architectural engineering; Computer science; Construction engineering; Environmental science; Engineering; Geography; Artificial intelligence; Cartography","score_opus":0.017294083305897243,"score_gpt":0.3618982840636547,"score_spread":0.34460420075775744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413274511","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.983904,0.00013311849,0.011135205,0.0004402585,0.00013165675,0.0017517309,0.00014730926,0.000028879898,0.002327844],"genre_scores_gemma":[0.9868914,0.0000663779,0.012461027,0.000046283487,0.00005083808,0.000083649225,0.00007947058,0.00002533479,0.00029560685],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9956096,0.00050204934,0.00065176375,0.0012562555,0.00091459247,0.0010657323],"domain_scores_gemma":[0.9977405,0.00042151392,0.00014856215,0.0014110329,0.000032569787,0.000245831],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0037440252,0.0003423618,0.00047122108,0.00020135689,0.00081363856,0.00009811964,0.0007899108,0.00023124405,0.00040488126],"category_scores_gemma":[0.0007176766,0.00033374576,0.00010967055,0.00039188063,0.0018082614,0.00057281664,0.0032791195,0.00069088966,5.120187e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018713844,0.0002462042,0.97353524,0.00036489675,0.000050591516,0.0000054965453,0.00064490817,0.00076371484,0.008652406,0.0015828393,0.00030181362,0.013664776],"study_design_scores_gemma":[0.0012713594,0.00018905745,0.8865613,0.00002883081,0.00005786825,0.0000080974105,0.014403417,0.020676607,0.002704132,0.068535335,0.005242364,0.0003216881],"about_ca_topic_score_codex":0.00039066598,"about_ca_topic_score_gemma":0.00004317837,"teacher_disagreement_score":0.08697397,"about_ca_system_score_codex":0.0028925494,"about_ca_system_score_gemma":0.00018851612,"threshold_uncertainty_score":0.9999115},"labels":[],"label_agreement":null},{"id":"W4414598008","doi":"10.1088/2634-4505/ae065f","title":"Building climate resiliency in offshore wind energy expansion plans","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Tropical and Extratropical Cyclones Research","field":"Earth and Planetary Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"United Nations University Institute for Water, Environment, and Health","funders":"","keywords":"Climate change; Extreme weather; Resilience (materials science); Renewable energy; Psychological resilience; Wind power; Scale (ratio); Vulnerability (computing)","score_opus":0.007472007473539046,"score_gpt":0.27943418009284887,"score_spread":0.2719621726193098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414598008","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99631214,0.000824459,0.00014847436,0.00081252225,0.000050389222,0.00027385485,0.000055932294,0.000014737787,0.0015074917],"genre_scores_gemma":[0.9989466,0.0005674064,0.00019287739,0.00007523367,0.00004272346,0.000004574632,0.000035773053,0.0000033523158,0.000131475],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99706537,0.00046570355,0.00030262032,0.000593727,0.0006077978,0.0009647945],"domain_scores_gemma":[0.99899155,0.0004107082,0.000019202613,0.00030622366,0.000024224068,0.00024806324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066170347,0.00017041386,0.00022201278,0.00028326258,0.0004180322,0.00009149945,0.00030465613,0.00017214341,0.0008251339],"category_scores_gemma":[0.0002835396,0.00013151267,0.000047025045,0.00047676027,0.0007983751,0.0002212893,0.00020227465,0.000725507,0.0000063734637],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023332199,0.000034635843,0.819372,0.00007642457,0.0000040230343,0.00004440117,0.000070453745,0.00034535772,0.00013517306,0.0020493215,0.00008107591,0.1775538],"study_design_scores_gemma":[0.00030157884,0.00015464441,0.90142417,0.000015353153,0.0000017846231,0.0000033245622,0.0010439834,0.001234426,0.00013291383,0.08875118,0.0068283426,0.00010826942],"about_ca_topic_score_codex":0.0023435333,"about_ca_topic_score_gemma":0.0024022341,"teacher_disagreement_score":0.17744553,"about_ca_system_score_codex":0.00013792048,"about_ca_system_score_gemma":0.0001337013,"threshold_uncertainty_score":0.9034637},"labels":[],"label_agreement":null},{"id":"W4415366627","doi":"10.1088/2634-4505/ae152f","title":"Conveying intermittent water supply schedules digitally: production burdens and consumption possibilities in Coimbatore, India","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Water resources management and optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Schedule; Production (economics); Water supply; Production schedule; Consumption (sociology); Transparency (behavior); Bureaucracy; Corporate governance","score_opus":0.0062861716293913066,"score_gpt":0.24489933484317392,"score_spread":0.23861316321378262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415366627","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9982056,0.00038539217,0.00018699316,0.00018079371,0.00006626771,0.0006684864,0.000006241107,0.00004369205,0.00025655507],"genre_scores_gemma":[0.9989433,0.0003097791,0.00007542216,0.000011988668,0.000021765343,0.000048617596,0.00004818984,0.000011808752,0.00052911445],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987636,0.000106177,0.00022376503,0.00032966386,0.00019887408,0.000377925],"domain_scores_gemma":[0.99968493,0.000044416684,0.000010821575,0.00017795817,0.000019382618,0.00006248982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050280907,0.00015094313,0.00014602102,0.00028839943,0.00013512888,0.0001525723,0.00008437179,0.000088370456,0.000048352398],"category_scores_gemma":[0.00008201717,0.00012398731,0.000018805027,0.00009020516,0.00050357525,0.0003252485,0.00025904097,0.00032536464,0.0000017494059],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007239525,0.000033798664,0.9671141,0.0007529137,0.000030283558,0.000009116128,0.0031110158,0.004475443,0.0007905848,0.00024945187,0.00008034799,0.023280581],"study_design_scores_gemma":[0.0003945434,0.00004296579,0.9672041,0.000044770717,0.0000069232406,0.0000022870747,0.0059510474,0.0038545702,0.0043884446,0.016968627,0.0009859614,0.00015579464],"about_ca_topic_score_codex":0.000016336275,"about_ca_topic_score_gemma":0.0000096375925,"teacher_disagreement_score":0.023124786,"about_ca_system_score_codex":0.0004880799,"about_ca_system_score_gemma":0.000011974774,"threshold_uncertainty_score":0.5056056},"labels":[],"label_agreement":null},{"id":"W4415638702","doi":"10.1088/2634-4505/ae186e","title":"Optimization-based scheme for nearly-zero energy multi-storied residential buildings with architectural design elements","year":2025,"lang":"en","type":"article","venue":"Environmental Research Infrastructure and Sustainability","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Energy consumption; Daylight; Daylighting; Building envelope; Envelope (radar); Parametric design; Energy (signal processing); Shading; Consumption (sociology); Scheme (mathematics)","score_opus":0.009550041921407437,"score_gpt":0.26197836747718967,"score_spread":0.2524283255557822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415638702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06606238,0.00014845059,0.93289834,0.00010666458,0.00006323291,0.00057474914,0.000015211488,0.00008380737,0.000047179477],"genre_scores_gemma":[0.87317926,0.00002407147,0.12616844,0.00003901839,0.000026724656,0.00023158,0.00007010982,0.000029216722,0.00023157251],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984161,0.00011682819,0.0002463694,0.00039179507,0.00031851965,0.0005103895],"domain_scores_gemma":[0.9992894,0.00020707316,0.000029580568,0.00028745792,0.00006968404,0.000116785624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045168135,0.00021883786,0.0001818381,0.00022051997,0.0004261297,0.00010507927,0.00019423621,0.00014306178,0.000043738633],"category_scores_gemma":[0.00012874704,0.00019693885,0.000043236,0.00028893285,0.00030750321,0.00016334763,0.00008699057,0.00028109577,7.6287364e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032409703,0.0000369872,0.0062948144,0.000112535876,0.00005049597,0.0000022436147,0.00007573508,0.9849583,0.00036738464,0.00056084944,0.0002800884,0.0069364654],"study_design_scores_gemma":[0.0015892003,0.00018496443,0.0038329712,0.00002281479,0.00001723565,0.0000016971777,0.00018364089,0.9819598,0.0051399632,0.004789845,0.0020364323,0.00024142514],"about_ca_topic_score_codex":0.00004084244,"about_ca_topic_score_gemma":0.000011052345,"teacher_disagreement_score":0.80711687,"about_ca_system_score_codex":0.00062192185,"about_ca_system_score_gemma":0.0001514594,"threshold_uncertainty_score":0.8030934},"labels":[],"label_agreement":null}]}