{"meta":{"query_hash":"ea21c713ee2e","filters":{"venue":"Eurasian Mining"},"cohort_total":4,"direct_labels_cover":0,"predictions_cover":4,"exported":4,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/ea21c713ee2e","api":"https://metacan.xera.ac/api/v1/cohort?venue=Eurasian+Mining"},"results":[{"id":"W3043421383","doi":"10.17580/em.2020.01.02","title":"Features of secondary stress field formation under anthropogenic change in subsoil during underground mineral mining","year":2020,"lang":"en","type":"article","venue":"Eurasian Mining","topic":"Geotechnical and Geomechanical Engineering","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Convergent Manufacturing Technologies (Canada)","funders":"Russian Science Foundation","keywords":"Subsoil; Geology; Field (mathematics); Stress (linguistics); Mining engineering; Mineral; Stress field; Environmental science; Geotechnical engineering; Geochemistry; Soil science; Soil water; Engineering; Ecology","score_opus":0.017153395856210132,"score_gpt":0.22009773958292553,"score_spread":0.20294434372671538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043421383","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98802984,0.000755981,0.008509251,0.00073661294,0.00017066966,0.00014182241,0.000011686853,0.0002419344,0.0014022212],"genre_scores_gemma":[0.99850976,0.000039619765,0.001058119,0.00015139721,0.00016205019,0.0000139763015,0.000015086068,0.00003617091,0.000013834204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893343,0.000017143238,0.00036675856,0.00019051309,0.00015377466,0.000338368],"domain_scores_gemma":[0.99961406,0.0000759269,0.00004753292,0.00013171467,0.000014784628,0.00011596937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006383488,0.0001959058,0.00027096827,0.00012073258,0.000036803904,0.00002434758,0.00016396356,0.00013636287,0.00010660431],"category_scores_gemma":[0.00004903876,0.00021032007,0.00007524369,0.0003630207,0.000017119235,0.00032423716,0.0000662545,0.0003145816,0.0000061147102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022334198,0.00015060356,0.006249515,0.0060746237,0.00028225285,0.0003876462,0.03025757,0.4615036,0.26819348,0.0009912343,0.00075862545,0.22492754],"study_design_scores_gemma":[0.0072592697,0.0010591199,0.27268144,0.003181521,0.00014558369,0.00020834089,0.024028372,0.36396444,0.32212856,0.00035023503,0.0014078784,0.003585219],"about_ca_topic_score_codex":0.000023892992,"about_ca_topic_score_gemma":0.00011114794,"teacher_disagreement_score":0.26643193,"about_ca_system_score_codex":0.000038793245,"about_ca_system_score_gemma":0.0000075995245,"threshold_uncertainty_score":0.85766035},"labels":[],"label_agreement":null},{"id":"W3127850314","doi":"10.17580/em.2020.02.06","title":"Classification of protective pillars toward higher safety and innovation in room-and-pillar coal mining","year":2020,"lang":"en","type":"article","venue":"Eurasian Mining","topic":"Geotechnical and Geomechanical Engineering","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomechanica (Canada)","funders":"Tomsk Polytechnic University","keywords":"Pillar; Coal; Coal mining; Mining engineering; Hard coal; Production (economics); Process (computing); Engineering; Waste management; Computer science; Structural engineering; Economics","score_opus":0.02641983417320309,"score_gpt":0.22268272299435196,"score_spread":0.19626288882114887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127850314","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88666284,0.00029360794,0.109090514,0.0017681376,0.00010457492,0.00032654023,0.0000071056375,0.00025071317,0.0014959412],"genre_scores_gemma":[0.9962536,0.000023462668,0.00359734,0.0000465859,0.00003397542,0.000010938107,0.0000051109237,0.000022035922,0.000006922772],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991569,0.000015208079,0.00037737645,0.00018680873,0.000102163845,0.00016157246],"domain_scores_gemma":[0.9997494,0.00004463145,0.000050365594,0.0000696912,0.000027050333,0.00005885074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015342247,0.00012639533,0.00020939414,0.00013247704,0.00002106987,0.000013165686,0.000059192436,0.00010057624,0.00001326905],"category_scores_gemma":[0.00014434662,0.00013281134,0.00001539218,0.0006341842,0.000020098287,0.00009611827,0.000042244774,0.0001778343,0.00000159794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003130853,0.000063139116,0.017210616,0.0020324874,0.00018572922,0.00005289078,0.017421382,0.20301789,0.38025218,0.012168036,0.00018082645,0.36710173],"study_design_scores_gemma":[0.002478365,0.0005303772,0.2814341,0.0006074498,0.000045561268,0.000020575291,0.003550922,0.68214434,0.011434877,0.0004343407,0.016234253,0.0010848227],"about_ca_topic_score_codex":0.000002577528,"about_ca_topic_score_gemma":0.0000012897456,"teacher_disagreement_score":0.47912648,"about_ca_system_score_codex":0.000024388592,"about_ca_system_score_gemma":0.0000062267636,"threshold_uncertainty_score":0.54158896},"labels":[],"label_agreement":null},{"id":"W4390412443","doi":"10.17580/em.2023.02.09","title":"Application of case-based reasoning in hazard evaluation in complex process flow control","year":2023,"lang":"en","type":"article","venue":"Eurasian Mining","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Adidas (Canada)","funders":"","keywords":"Process (computing); Computer science; Hazard; Hazard analysis; Control (management); Artificial intelligence; Reliability engineering; Engineering; Chemistry; Programming language","score_opus":0.11669068075255444,"score_gpt":0.42131495378064465,"score_spread":0.3046242730280902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390412443","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9644823,0.000039718318,0.032733306,0.0011140826,0.000030719584,0.00033320388,0.000010807386,0.000028188606,0.0012276497],"genre_scores_gemma":[0.9973631,0.000001633768,0.0024493677,0.000042917425,0.000022203145,0.000061720486,0.000030996744,0.000008276961,0.000019807012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972023,0.0004497489,0.0007615313,0.00038149196,0.0009995494,0.00020540744],"domain_scores_gemma":[0.9982085,0.00087628776,0.00029144553,0.00032508603,0.0002527819,0.000045903467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069431104,0.00009612532,0.0003207516,0.00085482345,0.00007570246,0.000046817055,0.00026369735,0.000056060213,0.00010702811],"category_scores_gemma":[0.0028017731,0.00008633294,0.00007019129,0.0035665005,0.000043430526,0.00016729794,0.000017529832,0.00009354118,0.000085280335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050722676,0.000026431817,0.32062256,0.0000072979983,0.0000067338274,0.0000726644,0.003239459,0.34727624,0.0003495819,0.00002432421,0.00012235215,0.32820162],"study_design_scores_gemma":[0.0007787873,0.000014945847,0.21550629,0.000025028763,0.000013364062,0.000006336015,0.004979397,0.7777223,0.0000645367,0.00076350407,0.00005728533,0.00006822719],"about_ca_topic_score_codex":0.00009571398,"about_ca_topic_score_gemma":0.0014679107,"teacher_disagreement_score":0.43044606,"about_ca_system_score_codex":0.000052950625,"about_ca_system_score_gemma":0.00010866043,"threshold_uncertainty_score":0.35205552},"labels":[],"label_agreement":null},{"id":"W4405332753","doi":"10.17580/em.2024.02.18","title":"Telecommunication solutions for creating high-precision satellite positioning at Kacharsk quarry","year":2024,"lang":"en","type":"article","venue":"Eurasian Mining","topic":"Geotechnical and Geomechanical Engineering","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomechanica (Canada)","funders":"","keywords":"Satellite; Telecommunications; Computer science; Remote sensing; Communications satellite; Geodesy; Geology; Engineering; Aerospace engineering","score_opus":0.014357234462862701,"score_gpt":0.2289411565977331,"score_spread":0.2145839221348704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405332753","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067090265,0.0069289505,0.91555226,0.0007636617,0.0009546379,0.00041337623,0.00004253462,0.0026914366,0.005562888],"genre_scores_gemma":[0.96088207,0.00015171534,0.038186673,0.000025552039,0.00020097879,0.0000836344,0.000102915255,0.0000715853,0.00029487547],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988066,0.000019562834,0.00034690087,0.0002492097,0.00012668679,0.0004510536],"domain_scores_gemma":[0.9991352,0.00043299005,0.00002146066,0.00028083724,0.000028497667,0.00010100103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034568587,0.0001863567,0.00017935764,0.00014261976,0.00031381517,0.00011448274,0.00018856481,0.00012563312,0.00007973229],"category_scores_gemma":[0.0001082602,0.00019526033,0.00011574499,0.00030795313,0.000016334998,0.00020203617,0.00010611358,0.00024138817,0.0001344235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000141549635,0.000020531113,0.0000151990125,0.00041403202,0.00010714169,0.000013267571,0.0011703166,0.41657975,0.10675506,0.008361682,0.0010678731,0.46548098],"study_design_scores_gemma":[0.00030292658,0.00010612609,0.0004547843,0.0010078462,0.0000700885,0.000047398633,0.00027706017,0.93134665,0.005894099,0.0015843662,0.058323354,0.0005853214],"about_ca_topic_score_codex":0.0000060715133,"about_ca_topic_score_gemma":0.000008604062,"teacher_disagreement_score":0.8937918,"about_ca_system_score_codex":0.00015859811,"about_ca_system_score_gemma":0.000008649696,"threshold_uncertainty_score":0.79624856},"labels":[],"label_agreement":null}]}