{"meta":{"query_hash":"405d715dda95","filters":{"venue":"European J of Industrial Engineering"},"cohort_total":18,"direct_labels_cover":0,"predictions_cover":18,"exported":18,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/405d715dda95","api":"https://metacan.xera.ac/api/v1/cohort?venue=European+J+of+Industrial+Engineering"},"results":[{"id":"W1981818925","doi":"10.1504/ejie.2014.065735","title":"Measuring the performance sensitivity of replenishment systems using tradeoff curves","year":2014,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Supply Chain and Inventory Management","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"University of Calgary","keywords":"Sensitivity (control systems); Supply chain; Reorder point; Computer science; Reliability engineering; Operations research; Engineering; Economic order quantity; Electronic engineering","score_opus":0.06375742886849213,"score_gpt":0.19017492692844892,"score_spread":0.12641749805995678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981818925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9177953,0.00077451195,0.076724574,0.00013774808,0.000028681809,0.00020372916,0.00026329636,0.00030720438,0.0037648499],"genre_scores_gemma":[0.99327517,0.00011178026,0.006261959,0.000012143373,0.0000042675492,0.000036926907,0.000114940834,0.000017434455,0.00016542913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.993594,0.0027549195,0.0005277337,0.0006559555,0.0020113005,0.00045617088],"domain_scores_gemma":[0.95939124,0.032022398,0.0038320585,0.00222487,0.00220599,0.00032351576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007883682,0.00114521,0.00088557875,0.0038685217,0.0003876463,0.0015470241,0.0008612387,0.0013234799,0.001037172],"category_scores_gemma":[0.037102032,0.00047989862,0.0010770172,0.0023760295,0.00068505935,0.0023145038,0.0012228348,0.0009253073,0.0001815008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078726787,0.0001757512,0.012636852,0.00019674003,0.00026255118,0.00010829999,0.00027690394,0.9502847,0.00995657,0.0018969637,0.00015345073,0.023263864],"study_design_scores_gemma":[0.00003425875,0.0017696993,0.019012626,0.0000493791,0.000095861644,0.000216749,0.00023027901,0.9582684,0.016747892,0.0027970443,0.000648436,0.0001294476],"about_ca_topic_score_codex":0.0023096015,"about_ca_topic_score_gemma":0.00081597845,"teacher_disagreement_score":0.007883682,"about_ca_system_score_codex":0.0015115984,"about_ca_system_score_gemma":0.0005013042,"threshold_uncertainty_score":0.04169339},"labels":[],"label_agreement":null},{"id":"W1996168241","doi":"10.1504/ejie.2007.014109","title":"An approximation method to analyse polling models of pull-type production systems","year":2007,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Advanced Queuing Theory Analysis","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"National Science Council","keywords":"Polling system; Polling; Queue; Markov chain; Computer science; Mathematical optimization; Queueing theory; State space; Production (economics); Type (biology); Mathematics; Computer network; Economics; Statistics","score_opus":0.04661673635014041,"score_gpt":0.26138266698824925,"score_spread":0.21476593063810884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996168241","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021359302,0.0002811858,0.9753948,0.00018256325,0.000047373243,0.000038218426,0.0000428526,0.00013575969,0.0025178152],"genre_scores_gemma":[0.88402164,0.000510807,0.11044806,0.00014520803,0.000072871735,0.00020578613,0.00012561148,0.000102824444,0.0043672686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947864,0.00021573484,0.000021409423,0.00005374701,0.00015347764,0.00007701834],"domain_scores_gemma":[0.99769956,0.0017686668,0.00019813504,0.000102804726,0.00015449988,0.000076378754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016031463,0.00080047245,0.00081909687,0.0007669375,0.00054612494,0.00092279626,0.0011893762,0.0011988996,0.0014708423],"category_scores_gemma":[0.005587627,0.00042289248,0.0011757234,0.00063082785,0.0010190479,0.0013378756,0.00088840537,0.0015114998,0.0001777931],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018757635,0.000015868967,0.00048333942,0.000028643251,0.000017503557,0.00007117596,0.00006425608,0.95568347,0.0010003672,0.03994914,0.0001976833,0.0024697725],"study_design_scores_gemma":[0.0000017805866,0.0000047283706,0.00002671559,0.0000017645409,0.0000017029279,0.0000069046105,0.0000046663586,0.99488777,0.00006330715,0.0048560295,0.00014297964,0.0000016590831],"about_ca_topic_score_codex":0.008146568,"about_ca_topic_score_gemma":0.0029609236,"teacher_disagreement_score":0.008146568,"about_ca_system_score_codex":0.0014160473,"about_ca_system_score_gemma":0.0010707802,"threshold_uncertainty_score":0.016198277},"labels":[],"label_agreement":null},{"id":"W2009400799","doi":"10.1504/ejie.2008.017685","title":"Deadlock-free scheduling of flexible job shops with limited capacity buffers","year":2008,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Mathematical optimization; Computer science; Scheduling (production processes); Integer programming; Job shop scheduling; Workload; Deadlock; Algorithm; Operations research; Mathematics; Distributed computing; Schedule","score_opus":0.04059708943142512,"score_gpt":0.18940126835308949,"score_spread":0.14880417892166437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009400799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05956482,0.00039667252,0.93754154,0.00012575157,0.00006355506,0.000103470215,0.00006085624,0.00026113397,0.0018820651],"genre_scores_gemma":[0.75392526,0.00041488349,0.24292852,0.00007164966,0.000040817933,0.00023028562,0.00018850491,0.000094264906,0.0021058999],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992238,0.0003146634,0.00003978308,0.00011994687,0.00015837984,0.00014328801],"domain_scores_gemma":[0.9987734,0.0007292054,0.00021751891,0.00010239016,0.00008750272,0.00008999041],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014931052,0.00080417976,0.00094311364,0.00046724096,0.0006587806,0.0011126073,0.0015670588,0.00070397375,0.0013974885],"category_scores_gemma":[0.0025226767,0.0007188332,0.000889498,0.0007211826,0.00081516634,0.0013552345,0.00080686784,0.00071281346,0.00017741547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014908714,0.00007168126,0.0002945466,0.00013348175,0.000049515966,0.00019979633,0.00008960917,0.9501262,0.004811346,0.023974657,0.00045273345,0.019647365],"study_design_scores_gemma":[0.000034606477,0.000076054755,0.00009750176,0.000007499773,0.000011459217,0.00003819178,0.00002234194,0.986179,0.0013375148,0.011447776,0.0007363969,0.000011638608],"about_ca_topic_score_codex":0.0016668886,"about_ca_topic_score_gemma":0.001921388,"teacher_disagreement_score":0.0016668886,"about_ca_system_score_codex":0.0006658432,"about_ca_system_score_gemma":0.0017989255,"threshold_uncertainty_score":0.007896423},"labels":[],"label_agreement":null},{"id":"W2039040122","doi":"10.1504/ejie.2011.039869","title":"An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server","year":2011,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Tabu search; Separable space; Job shop scheduling; Mathematical optimization; Algorithm; Variable neighborhood search; Computer science; Variable (mathematics); Branch and bound; Neighbourhood (mathematics); Mathematics; Metaheuristic","score_opus":0.020781175535914548,"score_gpt":0.19423571144111543,"score_spread":0.17345453590520088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039040122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021967174,0.00023373033,0.97370523,0.00012249085,0.000053095355,0.000096753,0.000045573313,0.0006130486,0.0031628162],"genre_scores_gemma":[0.2649843,0.00017751065,0.7308914,0.00010773406,0.0000373134,0.0004583114,0.00021003958,0.0001489506,0.0029843322],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966455,0.00009259678,0.000013487941,0.00006678827,0.00010491799,0.00005774732],"domain_scores_gemma":[0.99953926,0.0002823582,0.00004051584,0.00004416901,0.000056221066,0.000037530503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007095118,0.000726733,0.0009892229,0.00076458557,0.0003996706,0.0007929916,0.0018115676,0.0014578986,0.0034083303],"category_scores_gemma":[0.001660551,0.0004756781,0.00066719647,0.0010015663,0.000485432,0.0010483384,0.0010050908,0.0006946457,0.000515745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028078395,0.00015201577,0.0005232462,0.000184464,0.00006243667,0.00009830764,0.000120510405,0.8080015,0.005022773,0.018632203,0.0023557097,0.16456601],"study_design_scores_gemma":[0.00005812047,0.000060259215,0.00006288488,0.000005486813,0.0000070202777,0.000025575458,0.000012035166,0.99535036,0.00046158017,0.003219752,0.0007314558,0.000005439937],"about_ca_topic_score_codex":0.0020370802,"about_ca_topic_score_gemma":0.0023409175,"teacher_disagreement_score":0.0034083303,"about_ca_system_score_codex":0.00069804274,"about_ca_system_score_gemma":0.0009849094,"threshold_uncertainty_score":0.0114020705},"labels":[],"label_agreement":null},{"id":"W2046017616","doi":"10.1504/ejie.2014.060477","title":"Process mapping as a tool for participative integration of human factors into work system design","year":2014,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Scope (computer science); Process (computing); Process management; Production (economics); Identification (biology); Work (physics); Computer science; Work flow; Knowledge management; Business; Engineering; Manufacturing engineering; Economics","score_opus":0.09332879609408871,"score_gpt":0.25967817002654403,"score_spread":0.1663493739324553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2046017616","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008407186,0.00007994198,0.98203075,0.00031747774,0.000068084795,0.0011259278,0.00016895996,0.0015554171,0.0062463228],"genre_scores_gemma":[0.065209426,0.0000721456,0.9298643,0.00006277055,0.00002028976,0.0026012673,0.00019402223,0.00030031268,0.0016754849],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9384412,0.049981803,0.0023258722,0.0026000163,0.005874558,0.00077642174],"domain_scores_gemma":[0.8622767,0.1117117,0.0030342625,0.0155412555,0.0064610485,0.000975025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.062168032,0.0024877363,0.0010129706,0.007959087,0.003232861,0.0064223856,0.0026034664,0.0016450501,0.008858397],"category_scores_gemma":[0.074855834,0.0016418033,0.0013459418,0.004377307,0.0030444334,0.0077015334,0.0075402795,0.0023394679,0.0019474984],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004003169,0.0008337394,0.0038898895,0.0019897076,0.00018397628,0.00054060714,0.10088903,0.014751168,0.016071765,0.068912804,0.0049775764,0.78655946],"study_design_scores_gemma":[0.0009968653,0.003245144,0.012586348,0.0042373803,0.00040296346,0.0019101229,0.06328718,0.18108553,0.051902123,0.28840613,0.39115214,0.0007880257],"about_ca_topic_score_codex":0.0016482029,"about_ca_topic_score_gemma":0.0019704096,"teacher_disagreement_score":0.062168032,"about_ca_system_score_codex":0.002285209,"about_ca_system_score_gemma":0.0049917176,"threshold_uncertainty_score":0.32877994},"labels":[],"label_agreement":null},{"id":"W2076566755","doi":"10.1504/ejie.2009.025049","title":"Long-term electricity demand forecasting for power system planning using economic, demographic and climatic variables","year":2009,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demand forecasting; Electricity demand; Econometrics; Term (time); Electricity; Autoregressive model; Computer science; Electricity generation; Operations research; Economics; Power (physics); Engineering","score_opus":0.03379258355219278,"score_gpt":0.21176415000979742,"score_spread":0.17797156645760465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076566755","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5079453,0.00086310785,0.47431675,0.001648401,0.00012398358,0.00016143342,0.0032824131,0.0004075657,0.01125098],"genre_scores_gemma":[0.96561474,0.0004795016,0.031094296,0.000021374555,0.000026363412,0.00007758295,0.0012922904,0.000012860024,0.0013810102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977773,0.0001158217,0.000010805879,0.000023029248,0.000054347216,0.000018231314],"domain_scores_gemma":[0.9995173,0.00027295182,0.00005572177,0.000025953443,0.00011203544,0.000016064007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075465767,0.0003017592,0.00022915116,0.0003627856,0.00031895385,0.0004042286,0.00037534465,0.0002832564,0.001325896],"category_scores_gemma":[0.0022433547,0.00020308976,0.00021772827,0.0012689311,0.0001419887,0.000661281,0.00021840089,0.00036368662,0.00019111342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049986484,0.000037085705,0.013903972,0.00006047367,0.000035508077,0.00010543909,0.00007484342,0.9263894,0.0010729033,0.0050089248,0.0019735876,0.05128788],"study_design_scores_gemma":[0.000006568488,0.000029635266,0.0076121027,0.000013106249,0.00001796772,0.000019512503,0.000075007374,0.9871371,0.0005803385,0.0026750572,0.0018206144,0.00001302774],"about_ca_topic_score_codex":0.042051554,"about_ca_topic_score_gemma":0.10471286,"teacher_disagreement_score":0.042051554,"about_ca_system_score_codex":0.001516826,"about_ca_system_score_gemma":0.0012601262,"threshold_uncertainty_score":0.083613575},"labels":[],"label_agreement":null},{"id":"W2104291846","doi":"10.1504/ejie.2007.015388","title":"Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times","year":2007,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Job shop scheduling; Heuristics; Mathematical optimization; Flow shop scheduling; Scheduling (production processes); Computer science; Genetic algorithm; Cellular manufacturing; Mathematics","score_opus":0.022329596359407282,"score_gpt":0.2156353314236699,"score_spread":0.1933057350642626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104291846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35861284,0.00046319055,0.63194144,0.0004035611,0.00010789925,0.00031756965,0.00025608932,0.00027637646,0.007621108],"genre_scores_gemma":[0.86932796,0.00022890743,0.12609668,0.00006344411,0.000021070058,0.00031269426,0.00019336015,0.00005481051,0.003701132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916255,0.00029773804,0.000038414164,0.000103647646,0.00024724132,0.00015029473],"domain_scores_gemma":[0.9988281,0.0005536223,0.00020980014,0.000069950016,0.00015543336,0.00018315522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012012081,0.0010729082,0.0010078816,0.000857158,0.0010139617,0.001450552,0.0011175963,0.0014628981,0.001955492],"category_scores_gemma":[0.0024801795,0.00070587866,0.0006775051,0.0013254187,0.000604453,0.0008621263,0.00072350417,0.0007743104,0.00031963296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001466283,0.00009165008,0.00036543517,0.00006902835,0.000037310943,0.00028772897,0.00007456906,0.9769547,0.008145641,0.0043982663,0.00036472888,0.009064308],"study_design_scores_gemma":[0.00001567023,0.00007912842,0.00023308916,0.000006521331,0.000008337617,0.000038630995,0.000020017884,0.99550456,0.0016708153,0.0018668938,0.0005460051,0.000010335552],"about_ca_topic_score_codex":0.0060273116,"about_ca_topic_score_gemma":0.004650572,"teacher_disagreement_score":0.0060273116,"about_ca_system_score_codex":0.0012599102,"about_ca_system_score_gemma":0.0013203117,"threshold_uncertainty_score":0.0119844675},"labels":[],"label_agreement":null},{"id":"W2121822991","doi":"10.1504/ejie.2012.051077","title":"Heuristics for the response time variability problem","year":2012,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Heuristics; Heuristic; Mathematical optimization; Scheduling (production processes); Computer science; Time limit; Range (aeronautics); Job shop scheduling; Limit (mathematics); Algorithm; Mathematics; Engineering","score_opus":0.01779115523276254,"score_gpt":0.20115414663993697,"score_spread":0.18336299140717444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2121822991","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01998145,0.0011906268,0.971082,0.0002869274,0.00011325391,0.00025318572,0.0001232019,0.00095749786,0.0060119196],"genre_scores_gemma":[0.25370038,0.00096191664,0.7406769,0.0003762909,0.00015538975,0.00046271243,0.00042195988,0.0003440422,0.0029004228],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832934,0.0008113429,0.00007473019,0.00025687538,0.0002933855,0.00023436664],"domain_scores_gemma":[0.9957633,0.0031807919,0.00035165102,0.00031590406,0.0002485779,0.00013984095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025486737,0.0012784238,0.0010921203,0.0012492054,0.0006923695,0.0012058641,0.0017669525,0.0014176511,0.0035514343],"category_scores_gemma":[0.0064785266,0.0005754944,0.001055118,0.0013709553,0.0009168215,0.0013090706,0.0010907463,0.0020345477,0.00070668577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002120093,0.00019916223,0.0004519416,0.00021648215,0.000056188717,0.000108361135,0.00012380662,0.8580727,0.0027491897,0.02961364,0.0043095504,0.103887014],"study_design_scores_gemma":[0.00015583236,0.00016754237,0.00020689983,0.00003934607,0.00003510422,0.00008372283,0.000049561575,0.97371894,0.0016528555,0.019363966,0.004502172,0.00002400832],"about_ca_topic_score_codex":0.0027145518,"about_ca_topic_score_gemma":0.0034610478,"teacher_disagreement_score":0.0035514343,"about_ca_system_score_codex":0.001290032,"about_ca_system_score_gemma":0.0017203221,"threshold_uncertainty_score":0.013478875},"labels":[],"label_agreement":null},{"id":"W2129938040","doi":"10.1504/ejie.2015.067446","title":"A balanced two-sided CUSUM chart for monitoring time between events","year":2015,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Advanced Statistical Process Monitoring","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"National Natural Science Foundation of China","keywords":"CUSUM; Chart; X-bar chart; Control chart; Computer science; Statistics; Shewhart individuals control chart; EWMA chart; Reliability engineering; Process (computing); Mathematics; Engineering","score_opus":0.26761732066254335,"score_gpt":0.396000833103271,"score_spread":0.12838351244072765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129938040","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022140551,0.0005285591,0.97451335,0.000121793244,0.000083712854,0.0001364523,0.0002478422,0.0014722078,0.0007555743],"genre_scores_gemma":[0.5610167,0.0005693415,0.43545824,0.00013047634,0.00010807217,0.00037685907,0.000755464,0.0001670058,0.0014179054],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.996582,0.0009428022,0.0002972073,0.000609288,0.0013519321,0.00021675538],"domain_scores_gemma":[0.99049395,0.0034251548,0.0012754662,0.0006784223,0.0037832335,0.00034381062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030402,0.0019082613,0.0015060798,0.00227132,0.00074098207,0.0015801883,0.0012006864,0.00081833586,0.0014944965],"category_scores_gemma":[0.014925877,0.0003803076,0.00054106314,0.0016889112,0.0007718902,0.0017642851,0.0008672237,0.0011343776,0.00050112983],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018613741,0.00018685409,0.009781278,0.0005042595,0.00015718883,0.00056670175,0.000332192,0.43164417,0.055220813,0.019728951,0.006517779,0.4734985],"study_design_scores_gemma":[0.00004136136,0.00029059214,0.0019702832,0.000029880019,0.000036488258,0.00015719266,0.000031741933,0.97318,0.018000623,0.003298254,0.0028710696,0.00009252546],"about_ca_topic_score_codex":0.005077336,"about_ca_topic_score_gemma":0.0024911761,"teacher_disagreement_score":0.005077336,"about_ca_system_score_codex":0.0009863019,"about_ca_system_score_gemma":0.0020344134,"threshold_uncertainty_score":0.016078293},"labels":[],"label_agreement":null},{"id":"W2331680676","doi":"10.1504/ejie.2016.075126","title":"Cognitive mapping links human factors to corporate strategies","year":2016,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Cognitive Science and Mapping","field":"Computer Science","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Workplace Safety and Insurance Board","keywords":"Tacit knowledge; Cognitive map; Cognition; Quality (philosophy); Knowledge management; Strategic management; Process management; Business; Psychology; Computer science; Marketing","score_opus":0.11312809974945695,"score_gpt":0.2525741462518525,"score_spread":0.13944604650239553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2331680676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67371345,0.0020917892,0.14845008,0.004053357,0.000101800455,0.00018088834,0.00021413258,0.00025451925,0.17094003],"genre_scores_gemma":[0.9898565,0.00039944734,0.008804372,0.000070508795,0.000011811531,0.0000361398,0.000046350113,0.000014776486,0.00076011755],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99828833,0.00091766997,0.00006791522,0.00027255615,0.00028217403,0.00017130251],"domain_scores_gemma":[0.9886983,0.00841767,0.000988609,0.00068654784,0.0008758916,0.00033283292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019580463,0.0008142231,0.0002494284,0.0057183052,0.0011132207,0.0055114194,0.0005867131,0.000962488,0.004528402],"category_scores_gemma":[0.019336108,0.00035433366,0.0005113853,0.0035271775,0.0035582173,0.004523892,0.002510218,0.00086311175,0.00033235483],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002166978,0.000410471,0.10697007,0.0010243756,0.00040956814,0.0010260463,0.06965405,0.033365775,0.0036551298,0.26605338,0.003644583,0.51356983],"study_design_scores_gemma":[0.000046478013,0.00036241586,0.16087294,0.0005735753,0.00016627743,0.0005804502,0.06334026,0.046058703,0.0027616762,0.69762665,0.027400112,0.00021042302],"about_ca_topic_score_codex":0.0095112575,"about_ca_topic_score_gemma":0.0049282736,"teacher_disagreement_score":0.0095112575,"about_ca_system_score_codex":0.0018002463,"about_ca_system_score_gemma":0.001535236,"threshold_uncertainty_score":0.018911779},"labels":[],"label_agreement":null},{"id":"W3008391954","doi":"10.1504/ejie.2020.10027218","title":"Buffer allocation, equipment selection and line balancing optimisation in unreliable production lines","year":2020,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Workstation; Throughput; Production line; Selection (genetic algorithm); Computer science; Mathematical optimization; Production (economics); Line (geometry); Nonlinear system; Buffer (optical fiber); Algorithm; Engineering; Mathematics; Artificial intelligence","score_opus":0.022037789855762973,"score_gpt":0.19985108263775492,"score_spread":0.17781329278199196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3008391954","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065666094,0.00035649043,0.9295266,0.000113403716,0.000027356838,0.000053156422,0.00008714323,0.00017730656,0.003992475],"genre_scores_gemma":[0.89442945,0.00041166547,0.100271806,0.000031056497,0.000023978835,0.00017978624,0.00012525679,0.00007064023,0.0044564046],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996561,0.00010096758,0.000012019958,0.00006655613,0.00010339686,0.000060921364],"domain_scores_gemma":[0.99959666,0.00024507346,0.00007155358,0.000015138123,0.000050400242,0.000021214772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058772526,0.0009023289,0.0009287967,0.0005017622,0.0004066539,0.0010803121,0.0010460134,0.0009149087,0.0016535398],"category_scores_gemma":[0.0013833941,0.000509685,0.0005507284,0.000861606,0.0006033668,0.0006997455,0.00066160347,0.0007248893,0.0001785486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015543843,0.000005432865,0.00013080736,0.000016917651,0.000003687612,0.000021282334,0.000009754297,0.99636084,0.00048699815,0.0007727043,0.000060374263,0.0021156364],"study_design_scores_gemma":[0.0000049478836,0.0000139738795,0.00008550289,0.0000021440412,0.0000032283751,0.000005661508,0.000005521558,0.998988,0.00018325407,0.00055700337,0.00014905045,0.0000017738369],"about_ca_topic_score_codex":0.008868421,"about_ca_topic_score_gemma":0.0059043537,"teacher_disagreement_score":0.008868421,"about_ca_system_score_codex":0.00075334095,"about_ca_system_score_gemma":0.0011887482,"threshold_uncertainty_score":0.017633617},"labels":[],"label_agreement":null},{"id":"W3028265218","doi":"10.1504/ejie.2020.10029681","title":"A Bayesian Networks Approach to Fleet Availability Analysis Considering Managerial and Complex Causal Factors","year":2020,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Bayesian network; Maintainability; Reliability (semiconductor); Excavator; Asset management; Asset (computer security); Measure (data warehouse); Causal inference; Computer science; Risk analysis (engineering); Reliability engineering; Bayesian probability; Bayesian inference; Econometrics; Operations research; Engineering; Business; Economics; Data mining; Artificial intelligence; Finance","score_opus":0.18512309825974763,"score_gpt":0.3655648666621191,"score_spread":0.1804417684023715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3028265218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012885449,0.00026349587,0.9844743,0.00026008798,0.000017680164,0.000045128167,0.00023165092,0.000116129784,0.0017061592],"genre_scores_gemma":[0.64146876,0.0013548522,0.34979877,0.00016350806,0.00018919192,0.0004456953,0.00088794203,0.00009330982,0.0055979355],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983877,0.00089907896,0.00007050803,0.0002962992,0.00024729045,0.00009911216],"domain_scores_gemma":[0.9935295,0.0052017095,0.0006028276,0.00012975477,0.00042081016,0.0001153693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002782827,0.000999009,0.00097626855,0.00292627,0.000663043,0.0015084932,0.0016403307,0.0014094206,0.0025682282],"category_scores_gemma":[0.01061961,0.0010671325,0.0012847112,0.0021884348,0.0008860404,0.002074464,0.0010657279,0.001477179,0.00028393994],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015150781,0.000016304797,0.0008536506,0.000020359355,0.000050513063,0.000041140953,0.000032967957,0.9790907,0.00013369709,0.010443119,0.00018730723,0.009115228],"study_design_scores_gemma":[0.0000033413357,0.000006502948,0.00031494646,0.0000068062823,0.0000098812425,0.000010722327,0.0000074911604,0.98698354,0.000033605917,0.012373135,0.00024269013,0.0000072685652],"about_ca_topic_score_codex":0.038876697,"about_ca_topic_score_gemma":0.033339374,"teacher_disagreement_score":0.038876697,"about_ca_system_score_codex":0.0021516208,"about_ca_system_score_gemma":0.0016633446,"threshold_uncertainty_score":0.07730085},"labels":[],"label_agreement":null},{"id":"W4231106073","doi":"10.1504/ejie.2020.10031931","title":"A Systematic Literature Review of the Design of Intermodal Freight Transportation Networks Addressing Location-Allocation Decisions","year":2020,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Maritime Ports and Logistics","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Supply chain; Operations research; Network planning and design; Computer science; Systematic review; Key (lock); Supply chain management; Transport engineering; Management science; Engineering; Business; Marketing; Telecommunications","score_opus":0.04898543146761645,"score_gpt":0.2135431481484005,"score_spread":0.16455771668078406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231106073","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014391216,0.99198264,0.0025422361,0.001043437,0.00028275608,0.00069347234,0.00045312283,0.000022213251,0.0015410327],"genre_scores_gemma":[0.016599884,0.9745076,0.006499632,0.0006155562,0.00009671782,0.0009807831,0.00039925927,0.000010043754,0.00029057259],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9834102,0.008589516,0.0038008937,0.001144724,0.0026657986,0.00038884828],"domain_scores_gemma":[0.9541207,0.03331349,0.004388722,0.0009502988,0.0067891125,0.0004376528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01576501,0.0020696928,0.0048600873,0.016465062,0.0011116946,0.0036770883,0.0025781302,0.0028003026,0.0050923815],"category_scores_gemma":[0.0684661,0.0012900193,0.0053562094,0.016304076,0.0012823885,0.004452237,0.0018350992,0.0018511148,0.00069300976],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012589485,0.000052269,0.000654701,0.79949355,0.0020226373,0.0001978765,0.0005093493,0.0013051328,0.0003383517,0.003656745,0.005190749,0.1864527],"study_design_scores_gemma":[0.00009342608,0.000270785,0.0019530389,0.92116356,0.010907813,0.0003360205,0.0009099294,0.0005429666,0.00037687746,0.002629006,0.06076675,0.000049893715],"about_ca_topic_score_codex":0.010519954,"about_ca_topic_score_gemma":0.03192789,"teacher_disagreement_score":0.016465062,"about_ca_system_score_codex":0.0066609853,"about_ca_system_score_gemma":0.043160595,"threshold_uncertainty_score":0.08337432},"labels":[],"label_agreement":null},{"id":"W4232317444","doi":"10.1504/ejie.2018.10013866","title":"Latent Semantic Extraction and Analysis forTRIZ-Based Inventive Design","year":2018,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Design Education and Practice","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute of Particle Physics","funders":"","keywords":"TRIZ; Computer science; Process (computing); Heuristic; Latent semantic analysis; Resolution (logic); Artificial intelligence; Natural language processing; Programming language","score_opus":0.06536545525848135,"score_gpt":0.25392483305743047,"score_spread":0.1885593777989491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232317444","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04110453,0.0009186442,0.94043124,0.00070609327,0.00007839332,0.00035450936,0.0033728739,0.0019532559,0.011080384],"genre_scores_gemma":[0.47189042,0.0011756708,0.50145173,0.00014042584,0.000106111765,0.0008010225,0.013354342,0.0002141509,0.010866207],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99729913,0.00080367154,0.0002991576,0.00048625076,0.00090851745,0.00020324496],"domain_scores_gemma":[0.99682164,0.0014644789,0.00047287688,0.0005676666,0.00059389026,0.00007947157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001857219,0.00084929535,0.0005192061,0.010739042,0.0009393396,0.002396748,0.0010687485,0.001162126,0.0052473447],"category_scores_gemma":[0.006645669,0.00045171735,0.0016062664,0.0062064957,0.001352651,0.003945611,0.002251135,0.001448507,0.0017223359],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034808533,0.00038914284,0.014602073,0.0014852759,0.00020603242,0.0012676867,0.007165303,0.01586801,0.021560501,0.2959776,0.015891878,0.6252384],"study_design_scores_gemma":[0.00009921912,0.00025218198,0.020923464,0.00065813813,0.00035334495,0.0021111837,0.00604089,0.508524,0.033685602,0.24968393,0.1774482,0.00021988532],"about_ca_topic_score_codex":0.004141283,"about_ca_topic_score_gemma":0.0053417785,"teacher_disagreement_score":0.010739042,"about_ca_system_score_codex":0.0018992687,"about_ca_system_score_gemma":0.0020949624,"threshold_uncertainty_score":0.017554164},"labels":[],"label_agreement":null},{"id":"W4245387591","doi":"10.1504/ejie.2020.107696","title":"A Bayesian networks approach to fleet availability analysis considering managerial and complex causal factors","year":2020,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Bayesian network; Maintainability; Reliability (semiconductor); Excavator; Asset management; Measure (data warehouse); Asset (computer security); Computer science; Causal inference; Risk analysis (engineering); Reliability engineering; Bayesian probability; Bayesian inference; Operations research; Econometrics; Engineering; Business; Economics; Data mining; Artificial intelligence; Finance","score_opus":0.18512309825974763,"score_gpt":0.3655648666621191,"score_spread":0.1804417684023715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245387591","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012885449,0.00026349587,0.9844743,0.00026008798,0.000017680164,0.000045128167,0.00023165092,0.000116129784,0.0017061592],"genre_scores_gemma":[0.64146876,0.0013548522,0.34979877,0.00016350806,0.00018919192,0.0004456953,0.00088794203,0.00009330982,0.0055979355],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983877,0.00089907896,0.00007050803,0.0002962992,0.00024729045,0.00009911216],"domain_scores_gemma":[0.9935295,0.0052017095,0.0006028276,0.00012975477,0.00042081016,0.0001153693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002782827,0.000999009,0.00097626855,0.00292627,0.000663043,0.0015084932,0.0016403307,0.0014094206,0.0025682282],"category_scores_gemma":[0.01061961,0.0010671325,0.0012847112,0.0021884348,0.0008860404,0.002074464,0.0010657279,0.001477179,0.00028393994],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015150781,0.000016304797,0.0008536506,0.000020359355,0.000050513063,0.000041140953,0.000032967957,0.9790907,0.00013369709,0.010443119,0.00018730723,0.009115228],"study_design_scores_gemma":[0.0000033413357,0.000006502948,0.00031494646,0.0000068062823,0.0000098812425,0.000010722327,0.0000074911604,0.98698354,0.000033605917,0.012373135,0.00024269013,0.0000072685652],"about_ca_topic_score_codex":0.038876697,"about_ca_topic_score_gemma":0.033339374,"teacher_disagreement_score":0.038876697,"about_ca_system_score_codex":0.0021516208,"about_ca_system_score_gemma":0.0016633446,"threshold_uncertainty_score":0.07730085},"labels":[],"label_agreement":null},{"id":"W4366716758","doi":"10.1504/ejie.2024.10055607","title":"Penalty and Threshold Optimization of the Retailer - Vendor Return Contracts for Contract Re-Negotiation in Retail Reverse Supply Chains","year":2023,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Sustainable Supply Chain Management","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Vendor; Negotiation; Supply chain; Business; Supply chain management; Industrial organization; Supply chain optimization; Operations management; Marketing; Microeconomics; Operations research; Economics; Engineering","score_opus":0.03209896429338133,"score_gpt":0.2046703144476243,"score_spread":0.17257135015424296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366716758","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06426241,0.00030700266,0.92601156,0.000383434,0.000044051634,0.00016259603,0.000046852932,0.00007934339,0.00870284],"genre_scores_gemma":[0.8730242,0.00026141052,0.11984899,0.00006165003,0.000024863488,0.0001739255,0.00005507869,0.00006990843,0.0064798864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99722975,0.0014679765,0.000098167344,0.00035508128,0.000481355,0.00036763705],"domain_scores_gemma":[0.9961469,0.0025599734,0.00046251251,0.00022239049,0.00031616987,0.0002921211],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00419473,0.00097511493,0.001494683,0.00072199304,0.00085693784,0.0029181256,0.0017328061,0.0019167262,0.004388966],"category_scores_gemma":[0.009554236,0.0010344717,0.0010438204,0.000885116,0.0021455358,0.004405332,0.002204623,0.0032805186,0.0004080816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011964807,0.00009633505,0.00038201595,0.00008851876,0.000022185075,0.00010157847,0.00011760743,0.93635094,0.0015750842,0.049419925,0.0003990274,0.011327145],"study_design_scores_gemma":[0.000013542189,0.000045698747,0.00010397263,0.0000136801455,0.000007774089,0.000026335043,0.000042909407,0.98432654,0.0005842362,0.014308288,0.00051421975,0.000012695639],"about_ca_topic_score_codex":0.0032597184,"about_ca_topic_score_gemma":0.002671096,"teacher_disagreement_score":0.004388966,"about_ca_system_score_codex":0.0026079586,"about_ca_system_score_gemma":0.0029163838,"threshold_uncertainty_score":0.022184134},"labels":[],"label_agreement":null},{"id":"W4367725281","doi":"10.1504/ejie.2023.130596","title":"A stochastic mixed-integer model to support foodbank resources prepositioning during the prelude to a natural disaster","year":2023,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Facility Location and Emergency Management","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Integer (computer science); Natural disaster; Integer programming; Operations research; Mathematical economics; Economics; Engineering; Computer science; Mathematics; Mathematical optimization; Geography","score_opus":0.03320000804695024,"score_gpt":0.21577701769939514,"score_spread":0.1825770096524449,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367725281","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08215301,0.001322589,0.8894729,0.0022629148,0.00051170343,0.00029877742,0.001394716,0.00035014216,0.022233173],"genre_scores_gemma":[0.9042698,0.0008284369,0.08018173,0.00034464095,0.00015738244,0.0005683166,0.0007480936,0.00007683979,0.012824788],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989236,0.0004984039,0.000047443176,0.00018164625,0.00013959548,0.0002094038],"domain_scores_gemma":[0.99693847,0.002211158,0.0003193112,0.00004035115,0.00032649373,0.00016419202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020670039,0.0015948883,0.0013988927,0.0006064553,0.0005955696,0.0023921304,0.0018227961,0.0027087526,0.005473525],"category_scores_gemma":[0.0036866127,0.00094619987,0.0012967958,0.0009163678,0.00091806456,0.00094989524,0.0012978048,0.002512271,0.00045202792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021581849,0.000015735906,0.00015057271,0.000026933458,0.000012436712,0.000049153354,0.00001111552,0.99617094,0.000093922405,0.002402377,0.00021539276,0.0008298328],"study_design_scores_gemma":[0.000008503401,0.000020059815,0.00005815715,0.0000051886977,0.0000062706954,0.0000044369226,0.000010513403,0.9990055,0.00002680565,0.0006513072,0.0001998995,0.0000033559206],"about_ca_topic_score_codex":0.0143332705,"about_ca_topic_score_gemma":0.010895784,"teacher_disagreement_score":0.0143332705,"about_ca_system_score_codex":0.0015446483,"about_ca_system_score_gemma":0.0021346433,"threshold_uncertainty_score":0.028499722},"labels":[],"label_agreement":null},{"id":"W4396552841","doi":"10.1504/ejie.2024.138195","title":"Penalty and threshold optimisation of the retailer - vendor return contracts for contract re-negotiation in retail reverse supply chains","year":2024,"lang":"en","type":"article","venue":"European J of Industrial Engineering","topic":"Outsourcing and Supply Chain Management","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Vendor; Supply chain; Negotiation; Business; Supply chain management; Industrial organization; Contract management; Operations management; Commerce; Microeconomics; Marketing; Economics","score_opus":0.03218394434574681,"score_gpt":0.20540617772116057,"score_spread":0.17322223337541376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396552841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061787475,0.00028797143,0.9284559,0.00032116496,0.00003681014,0.00017029571,0.000039566723,0.00008453975,0.008816343],"genre_scores_gemma":[0.87298834,0.00022960309,0.120350905,0.0000536214,0.00002193038,0.00015818962,0.000044535347,0.00007195441,0.0060808784],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969503,0.0016154274,0.00010708033,0.0003819385,0.000550831,0.00039441723],"domain_scores_gemma":[0.9959124,0.0027122388,0.00052381156,0.00026362244,0.00030441012,0.00028358752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041874144,0.00090176717,0.0014921913,0.0007137981,0.0008082611,0.0028336302,0.0017863145,0.0018976758,0.004387089],"category_scores_gemma":[0.0098071685,0.0009822742,0.00105903,0.00083746057,0.0021435644,0.0042823604,0.002287884,0.0031839302,0.00041854044],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012451409,0.00009551143,0.00038831992,0.00009948671,0.000022959235,0.000102690974,0.00012862081,0.93908805,0.0017542647,0.04435781,0.00033924158,0.013498526],"study_design_scores_gemma":[0.000015950827,0.00005769109,0.00013049667,0.000016419222,0.000008748554,0.00003604787,0.000050342245,0.98286384,0.0007580979,0.015423434,0.00062414585,0.000014798208],"about_ca_topic_score_codex":0.002787578,"about_ca_topic_score_gemma":0.0022946247,"teacher_disagreement_score":0.004387089,"about_ca_system_score_codex":0.0023912054,"about_ca_system_score_gemma":0.0025995467,"threshold_uncertainty_score":0.02214545},"labels":[],"label_agreement":null}]}