{"meta":{"query_hash":"5bfbdfd57236","filters":{"venue":"Guangdong Electric Power"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/5bfbdfd57236","api":"https://metacan.xera.ac/api/v1/cohort?venue=Guangdong+Electric+Power"},"results":[{"id":"W2372354105","doi":"","title":"Analysis on Fault Trips Caused by Forest Fire in CSG in the First Quarter of Year 2010","year":2011,"lang":"en","type":"article","venue":"Guangdong Electric Power","topic":"Power Systems and Technologies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"TRIPS architecture; Fault (geology); Engineering; Electric power transmission; Quarter (Canadian coin); Line (geometry); Transmission line; Forensic engineering; Transport engineering; Electrical engineering; Geography; Seismology; Geology; Mathematics","score_opus":0.009525908735944704,"score_gpt":0.1913988487053769,"score_spread":0.1818729399694322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2372354105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9930309,0.0006175151,0.00016446556,0.000075511445,0.00012962296,0.00019389298,0.000010183926,0.00011727333,0.0056606187],"genre_scores_gemma":[0.99978304,0.000037605605,0.000012484095,0.000027378612,0.0000070615365,0.00003782737,0.0000045217926,0.000015411539,0.00007468917],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990562,0.000023316366,0.00028849943,0.00016258236,0.00016015978,0.0003092438],"domain_scores_gemma":[0.9994558,0.000059255097,0.000048364178,0.00040490663,0.000014049785,0.000017606251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021894844,0.00014576307,0.00027610932,0.0004649421,0.0000178755,0.0000111632835,0.00032358035,0.00015781901,0.00005145735],"category_scores_gemma":[0.00003415132,0.00010671606,0.00009218552,0.0016428623,0.00001846559,0.00006278354,0.0000120301,0.00026572507,0.000025061614],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011576419,0.0008452517,0.7888415,0.0001356803,0.0010363692,0.00018114249,0.011426393,0.0016296167,0.0014583314,0.0020236745,0.1875195,0.004786759],"study_design_scores_gemma":[0.0013208468,0.00043861277,0.97230506,0.000071243434,0.00011459857,0.0000039975007,0.0007476565,0.009602046,0.003823021,0.00030937718,0.010708417,0.0005551046],"about_ca_topic_score_codex":0.00088000327,"about_ca_topic_score_gemma":0.002163842,"teacher_disagreement_score":0.18346357,"about_ca_system_score_codex":0.0000563023,"about_ca_system_score_gemma":0.000007766485,"threshold_uncertainty_score":0.43517548},"labels":[],"label_agreement":null},{"id":"W2385030465","doi":"","title":"Recommendations to prevent Guangdong power system cascading blackout","year":2005,"lang":"en","type":"article","venue":"Guangdong Electric Power","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Electric power system; Engineering; Reliability engineering; Power (physics); Power network; Cascading failure; Electric power industry; Electrical engineering; Computer security; Electricity; Computer science","score_opus":0.009460935174446732,"score_gpt":0.23374657750076797,"score_spread":0.22428564232632123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2385030465","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6080723,0.0058752196,0.22373666,0.003789433,0.0073556667,0.0041207443,0.00015215359,0.008332929,0.13856491],"genre_scores_gemma":[0.9936217,0.000028256805,0.0023153876,0.00022604063,0.000293177,0.00017287696,0.000017447,0.00018371298,0.0031414153],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99670684,0.0001235911,0.00089569273,0.0005921057,0.0005644539,0.0011173234],"domain_scores_gemma":[0.9982938,0.0001427016,0.00009434828,0.00079530996,0.00012909675,0.00054470985],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000632545,0.0005206564,0.00054277,0.0007045765,0.00021681482,0.00014963177,0.00055234734,0.00025388453,0.0007635084],"category_scores_gemma":[0.00006365887,0.00052226504,0.00022679337,0.0013952059,0.000014990317,0.0003913228,0.000057052286,0.0004808465,0.0027900948],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000834905,0.00058807014,0.00063265313,0.0005423573,0.0010021684,0.00021840405,0.013684483,0.030708501,0.21178587,0.004908731,0.7071547,0.028690562],"study_design_scores_gemma":[0.0008055169,0.00016031945,0.0006662174,0.0005527196,0.00007610392,0.00022971795,0.0005090232,0.017060457,0.034256283,0.000009511255,0.94430614,0.0013679734],"about_ca_topic_score_codex":0.000038136124,"about_ca_topic_score_gemma":0.000028231632,"teacher_disagreement_score":0.3855494,"about_ca_system_score_codex":0.0009844619,"about_ca_system_score_gemma":0.000070535505,"threshold_uncertainty_score":0.9997229},"labels":[],"label_agreement":null}]}