{"meta":{"query_hash":"5bfbdfd57236","filters":{"venue":"Guangdong Electric Power"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/5bfbdfd57236","api":"https://metacan.xera.ac/api/v1/cohort?venue=Guangdong+Electric+Power"},"results":[{"id":"W2372354105","doi":"","title":"Analysis on Fault Trips Caused by Forest Fire in CSG in the First Quarter of Year 2010","year":2011,"lang":"en","type":"article","venue":"Guangdong Electric Power","topic":"Power Systems and Technologies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"TRIPS architecture; Fault (geology); Engineering; Electric power transmission; Quarter (Canadian coin); Line (geometry); Transmission line; Forensic engineering; Transport engineering; Electrical engineering; Geography; Seismology; Geology; Mathematics","score_opus":0.009525908735944704,"score_gpt":0.1913988487053769,"score_spread":0.1818729399694322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2372354105","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969047,0.00007361411,0.00026991148,0.000019485029,0.000003945666,0.000012182563,0.0016531441,0.000018148747,0.0010448142],"genre_scores_gemma":[0.99725014,0.00008434406,0.00013889681,0.000007729994,0.000003210553,0.0000048408324,0.001962222,0.000002643693,0.00054601865],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997625,0.000015949932,0.00002040257,0.000032350046,0.00008336081,0.00008548811],"domain_scores_gemma":[0.9992879,0.00010168767,0.00026114695,0.000033893644,0.00020349534,0.00011200823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022399033,0.00021207274,0.00023120557,0.0021150894,0.00033073145,0.0002655405,0.00022137207,0.00023599672,0.0008123194],"category_scores_gemma":[0.0005779212,0.000091881586,0.00038609726,0.0017237704,0.00017241004,0.00020941194,0.00018933522,0.00022557759,0.00013145003],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067690655,0.00008957157,0.9230128,0.00014658243,0.00017030441,0.0027002385,0.00076234725,0.03311397,0.0063732592,0.000341872,0.0022777028,0.030334491],"study_design_scores_gemma":[0.000003320687,0.000074580304,0.99187404,0.000008588288,0.00003753371,0.00039283375,0.00072743243,0.0052965363,0.0007301183,0.000034277065,0.0008132834,0.0000076062042],"about_ca_topic_score_codex":0.07217181,"about_ca_topic_score_gemma":0.11701867,"teacher_disagreement_score":0.07217181,"about_ca_system_score_codex":0.0010182628,"about_ca_system_score_gemma":0.00041731738,"threshold_uncertainty_score":0.14350343},"labels":[],"label_agreement":null},{"id":"W2385030465","doi":"","title":"Recommendations to prevent Guangdong power system cascading blackout","year":2005,"lang":"en","type":"article","venue":"Guangdong Electric Power","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Electric power system; Engineering; Reliability engineering; Power (physics); Power network; Cascading failure; Electric power industry; Electrical engineering; Computer security; Electricity; Computer science","score_opus":0.009460935174446732,"score_gpt":0.23374657750076797,"score_spread":0.22428564232632123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2385030465","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03546021,0.014884871,0.04613565,0.5706151,0.013939485,0.0061031957,0.0058839684,0.007224768,0.29975277],"genre_scores_gemma":[0.2763861,0.027374962,0.1375614,0.15666883,0.0052207056,0.008009744,0.007153436,0.0005196232,0.38110524],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99758065,0.0007588197,0.00022966406,0.00014955732,0.0008674369,0.0004139421],"domain_scores_gemma":[0.9901376,0.0014548324,0.0006687524,0.0003435609,0.005868197,0.0015270684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026488625,0.0013907884,0.00043012388,0.002057208,0.001570828,0.0015026231,0.001888121,0.006293542,0.024098717],"category_scores_gemma":[0.009531908,0.0004762963,0.0007350294,0.0008891963,0.0006220455,0.0018904471,0.0012606976,0.003077789,0.005648576],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011269738,0.00047450652,0.007469569,0.0009515742,0.000052644747,0.0012862876,0.0010073436,0.0060125487,0.002685563,0.0040133344,0.836192,0.13974193],"study_design_scores_gemma":[0.00049788516,0.00031218218,0.029262861,0.00255452,0.00021587593,0.0005879484,0.0067174514,0.006518295,0.0032268576,0.008622862,0.9412754,0.00020784832],"about_ca_topic_score_codex":0.053096194,"about_ca_topic_score_gemma":0.09538121,"teacher_disagreement_score":0.053096194,"about_ca_system_score_codex":0.0019292257,"about_ca_system_score_gemma":0.012527443,"threshold_uncertainty_score":0.10557431},"labels":[],"label_agreement":null}]}