{"meta":{"query_hash":"ca4115576c4a","filters":{"venue":"HPC Bridge Views"},"cohort_total":6,"direct_labels_cover":0,"predictions_cover":6,"exported":6,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/ca4115576c4a","api":"https://metacan.xera.ac/api/v1/cohort?venue=HPC+Bridge+Views"},"results":[{"id":"W566613237","doi":"","title":"HPC for Durability of the Confederation Bridge","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Engineering; Durability; Civil engineering; Mile; Forensic engineering; Geology; Computer science","score_opus":0.035829529646418175,"score_gpt":0.26094870189000363,"score_spread":0.22511917224358546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W566613237","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062370647,0.0068212952,0.11417909,0.0019085248,0.0010317736,0.00013301762,0.0033213443,0.001130805,0.8091036],"genre_scores_gemma":[0.7369585,0.005403671,0.049678285,0.00038182957,0.0006894705,0.00027675278,0.0033483908,0.0008504512,0.20241253],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99938416,0.00004832631,0.000014158363,0.000061602914,0.00044484995,0.00004685908],"domain_scores_gemma":[0.99959296,0.000071387,0.00002156872,0.00011520372,0.00016859853,0.000030326484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004024676,0.00035869319,0.00024503237,0.0013041676,0.0008303809,0.0011793431,0.0009608274,0.00047348475,0.028092496],"category_scores_gemma":[0.0010605353,0.00012368083,0.00024368064,0.001232388,0.00050852867,0.0011795211,0.0010845285,0.00070140295,0.004608502],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011659496,0.000069959344,0.007286411,0.00032350756,0.000026380898,0.0006234561,0.0004679235,0.037961226,0.024641506,0.27956605,0.082114816,0.56680214],"study_design_scores_gemma":[0.00002080051,0.00012774221,0.014601035,0.00020364422,0.000030929896,0.0012322321,0.0004074275,0.0687007,0.025962856,0.07572667,0.81291974,0.00006626017],"about_ca_topic_score_codex":0.008359987,"about_ca_topic_score_gemma":0.0070689237,"teacher_disagreement_score":0.028092496,"about_ca_system_score_codex":0.0011857767,"about_ca_system_score_gemma":0.0010472948,"threshold_uncertainty_score":0.09397876},"labels":[],"label_agreement":null},{"id":"W574372706","doi":"","title":"The Bow River Bridge – A Precast Record","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Girder; Pier; Structural engineering; Engineering; Prestressed concrete; Bridge (graph theory); Span (engineering); Structural load; Expansion joint; Geotechnical engineering; Forensic engineering","score_opus":0.040046694204015576,"score_gpt":0.2555065274500129,"score_spread":0.21545983324599732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W574372706","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14136775,0.008385577,0.0054526245,0.0038724348,0.0009880478,0.00017959604,0.003780018,0.000876477,0.83509743],"genre_scores_gemma":[0.21785568,0.0065150806,0.011799785,0.00081368984,0.00037335523,0.000053436543,0.0072484566,0.00044931422,0.7548911],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994037,0.000015691568,0.000014907117,0.00008674212,0.0004170425,0.00006202254],"domain_scores_gemma":[0.9995523,0.00001739587,0.000027843731,0.00007273499,0.00024427625,0.00008541334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034579195,0.00023310541,0.00014365616,0.0015788189,0.0025390137,0.0018470173,0.0010644083,0.00052799605,0.041044958],"category_scores_gemma":[0.00069480983,0.0002608603,0.0001068789,0.0017326642,0.000672531,0.001078584,0.0015433398,0.0006734684,0.0069799256],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001488505,0.00011730747,0.013938776,0.00036899358,0.000022667644,0.0010405526,0.0019652022,0.0005891279,0.010133689,0.035544313,0.18720466,0.7489258],"study_design_scores_gemma":[0.000004739321,0.000080200225,0.020635536,0.00008466486,0.0000057138022,0.0007359365,0.00055781775,0.00013680913,0.0016989037,0.0006522235,0.9753887,0.000018785504],"about_ca_topic_score_codex":0.10501545,"about_ca_topic_score_gemma":0.39194387,"teacher_disagreement_score":0.10501545,"about_ca_system_score_codex":0.0017834736,"about_ca_system_score_gemma":0.0036250353,"threshold_uncertainty_score":0.20880842},"labels":[],"label_agreement":null},{"id":"W590758382","doi":"","title":"Sturgeon River Bridge: 100-Year Service Life","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Girder; Sturgeon; Deck; Bridge (graph theory); Engineering; Structural engineering; Abutment; Civil engineering; Prestressed concrete; Service life; Span (engineering); Culvert; Beam bridge; Bridge deck; Forensic engineering; Fish <Actinopterygii>; Fishery; Mechanical engineering","score_opus":0.045505329819969506,"score_gpt":0.2610779696081937,"score_spread":0.21557263978822416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W590758382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86356664,0.0015219104,0.0131753655,0.0010581319,0.00015010349,0.00011356836,0.0019237293,0.0011172604,0.1173733],"genre_scores_gemma":[0.9133825,0.00096627785,0.0055773435,0.00020483245,0.00002812306,0.000065810294,0.0035038642,0.00009992642,0.076171346],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99978584,0.000005098782,0.000005607949,0.00001082222,0.00013727126,0.000055303415],"domain_scores_gemma":[0.9998553,0.0000025800534,0.0000054692287,0.00000497269,0.00006897378,0.000062614876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032522154,0.00020387475,0.00014460775,0.00035985548,0.00059155555,0.00050763896,0.0004146585,0.00051243784,0.0057764766],"category_scores_gemma":[0.00020093078,0.00006657124,0.00010593295,0.00036613256,0.0001777926,0.00040170882,0.00069278723,0.00025068867,0.0019764483],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065457117,0.00064614305,0.102678224,0.000375861,0.000057426005,0.0031519851,0.0023402474,0.012875511,0.15123641,0.010874245,0.08121806,0.6338913],"study_design_scores_gemma":[0.00009081292,0.0022423822,0.32135537,0.00011523913,0.000065480686,0.0060108285,0.002015262,0.009336784,0.031938843,0.0022948056,0.6244304,0.00010368314],"about_ca_topic_score_codex":0.04906836,"about_ca_topic_score_gemma":0.17094094,"teacher_disagreement_score":0.04906836,"about_ca_system_score_codex":0.0011022923,"about_ca_system_score_gemma":0.001537513,"threshold_uncertainty_score":0.09756553},"labels":[],"label_agreement":null},{"id":"W610655545","doi":"","title":"HPC Deck Panels for Jacques Cartier Bridge","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Deck; Bridge (graph theory); Bridge deck; Durability; Structural engineering; Slab; Engineering; Prestressed concrete; Forensic engineering; Geotechnical engineering; Civil engineering; Computer science","score_opus":0.06676663726339349,"score_gpt":0.2888088354447209,"score_spread":0.22204219818132742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W610655545","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7112015,0.0014994983,0.021359954,0.0020692945,0.0008103285,0.0003539737,0.0008622209,0.001487646,0.26035556],"genre_scores_gemma":[0.78972393,0.00091427367,0.027139632,0.00024979742,0.00014597036,0.00004878826,0.0010404123,0.00015580072,0.18058135],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99977094,0.000012253553,0.0000040909595,0.000023156892,0.00015446317,0.000035158435],"domain_scores_gemma":[0.999882,0.000007930696,0.000008082734,0.00001534047,0.0000626319,0.000024035593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017653257,0.000330267,0.00009029142,0.00039228812,0.00097185525,0.0004686617,0.00040093123,0.00040307557,0.013710135],"category_scores_gemma":[0.00027652094,0.0001294632,0.00017402403,0.00016634875,0.00022702993,0.00021075421,0.0004069106,0.00037223366,0.0013923256],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054283405,0.0004613935,0.041213505,0.00026614487,0.00003935297,0.013828843,0.0015967246,0.021181244,0.21939632,0.015993826,0.10878944,0.5766903],"study_design_scores_gemma":[0.000043896896,0.0008047032,0.08292299,0.000060440205,0.000027114054,0.0063805385,0.0005721857,0.0109140035,0.06540708,0.00077783735,0.8320277,0.000061535786],"about_ca_topic_score_codex":0.06360436,"about_ca_topic_score_gemma":0.2092557,"teacher_disagreement_score":0.93639565,"about_ca_system_score_codex":0.0009769291,"about_ca_system_score_gemma":0.0015320056,"threshold_uncertainty_score":0.1264683},"labels":[],"label_agreement":null},{"id":"W642909391","doi":"","title":"Large-Scale Use of HPC for Bridges at Toronto Airport","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Innovative concrete reinforcement materials","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Deck; Christian ministry; Bridge (graph theory); Civil engineering; Transport engineering; Engineering; Redevelopment; International airport; Forensic engineering; Structural engineering","score_opus":0.05158768257150693,"score_gpt":0.27896060631050135,"score_spread":0.22737292373899443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W642909391","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8841131,0.0001904998,0.011022114,0.00030713915,0.00004918235,0.00023769277,0.0006082307,0.00083146617,0.102640554],"genre_scores_gemma":[0.9812874,0.00014109233,0.007849808,0.000021155947,0.000010289349,0.000054856824,0.00058677315,0.00005401598,0.009994502],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99951804,0.00004447914,0.000007832757,0.00004351065,0.00026778705,0.00011840738],"domain_scores_gemma":[0.999577,0.000028811924,0.000013260395,0.000088449386,0.0001793612,0.00011319616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055809255,0.00021963316,0.00008837461,0.0004288461,0.0013192351,0.00049710827,0.0005908129,0.0002532947,0.0045055347],"category_scores_gemma":[0.0005935022,0.000119227145,0.00016423211,0.000591584,0.00039289723,0.0003286137,0.0006081284,0.0003326214,0.0007470844],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00081710954,0.00085211656,0.08498964,0.0003890672,0.000082489925,0.0059007737,0.009536575,0.09053327,0.19188961,0.023633394,0.07142987,0.51994604],"study_design_scores_gemma":[0.00031323964,0.0030879313,0.26901385,0.00017603194,0.00013416994,0.0021893128,0.009804907,0.065824986,0.13464954,0.003112548,0.5115083,0.00018520601],"about_ca_topic_score_codex":0.2011557,"about_ca_topic_score_gemma":0.5028358,"teacher_disagreement_score":0.7988443,"about_ca_system_score_codex":0.0030608927,"about_ca_system_score_gemma":0.0040427037,"threshold_uncertainty_score":0.39996976},"labels":[],"label_agreement":null},{"id":"W643813351","doi":"","title":"Ontario’s HPC Performance Specification","year":2005,"lang":"en","type":"article","venue":"HPC Bridge Views","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Christian ministry; Quality assurance; Payment; Work (physics); Engineering; Acceptance testing; Flexibility (engineering); Product (mathematics); Civil engineering; Construction engineering; Operations management; Computer science; Mechanical engineering; Software engineering","score_opus":0.02547147474199049,"score_gpt":0.21793857522588747,"score_spread":0.19246710048389698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W643813351","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028699836,0.00038980634,0.033402234,0.0036335974,0.00023818159,0.00055645086,0.032618452,0.0036492732,0.8968121],"genre_scores_gemma":[0.29125217,0.0015207762,0.053332843,0.0009495153,0.00012448648,0.00082193105,0.056055266,0.0021912025,0.5937518],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99443877,0.0002501356,0.00017464995,0.00021015435,0.0041194484,0.0008068465],"domain_scores_gemma":[0.9933969,0.00024418838,0.00013920177,0.0005180696,0.005354355,0.0003473898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002349755,0.00074950716,0.00024727674,0.0014260563,0.0031664337,0.0024851982,0.0021299091,0.0009812397,0.030155262],"category_scores_gemma":[0.0039222385,0.0005528253,0.0003888951,0.0021660568,0.0010307486,0.0015002784,0.0011815638,0.00086450326,0.012703676],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038493358,0.00015220926,0.013701134,0.0004418516,0.000015558337,0.00045919494,0.001814928,0.026277786,0.016653838,0.15347785,0.68280333,0.10381736],"study_design_scores_gemma":[0.000021037413,0.000033957014,0.0055060307,0.00006835931,0.000008568884,0.00010791651,0.0004903629,0.0063299066,0.0034144388,0.0018924735,0.9820816,0.000045303077],"about_ca_topic_score_codex":0.91338974,"about_ca_topic_score_gemma":0.926115,"teacher_disagreement_score":0.08661026,"about_ca_system_score_codex":0.029470922,"about_ca_system_score_gemma":0.041711826,"threshold_uncertainty_score":0.21382749},"labels":[],"label_agreement":null}]}