{"meta":{"query_hash":"c56ea11ecc88","filters":{"venue":"IEEE Power Engineering Society General Meeting, 2004."},"cohort_total":64,"direct_labels_cover":0,"predictions_cover":64,"exported":64,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/c56ea11ecc88","api":"https://metacan.xera.ac/api/v1/cohort?venue=IEEE+Power+Engineering+Society+General+Meeting%2C+2004."},"results":[{"id":"W1484067988","doi":"10.1109/pes.2004.1373177","title":"Operating-condition-dependent ARMA model for PSS application","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Autoregressive–moving-average model; Moving average; Control theory (sociology); Nonlinear system; Moving-average model; Computer science; Work (physics); Power (physics); Mathematics; Engineering; Autoregressive model; Autoregressive integrated moving average; Time series; Artificial intelligence; Econometrics; Machine learning","score_opus":0.0071873304388198455,"score_gpt":0.2236608815714233,"score_spread":0.21647355113260347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1484067988","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0058887578,0.0003413209,0.983651,0.00020067164,0.000092353635,0.00006376896,0.00020422207,0.0012219314,0.008335909],"genre_scores_gemma":[0.8674453,0.0010635937,0.10580889,0.00014889348,0.00014506192,0.0006823251,0.00085694756,0.00019822754,0.023650762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976104,0.00006762282,0.000014772556,0.00005748496,0.00008442814,0.000014650005],"domain_scores_gemma":[0.99973744,0.000075125696,0.000040386873,0.00004472735,0.000095138115,0.0000071449053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030969415,0.000878316,0.0007110403,0.000262516,0.00028518765,0.00074101286,0.0009632858,0.0011149117,0.006190983],"category_scores_gemma":[0.0009502165,0.00028974563,0.0006290567,0.0004269911,0.00021694704,0.00061707216,0.00042250587,0.0014669962,0.0030607367],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000895568,0.00004171933,0.0003648351,0.00018874223,0.00004491335,0.00014016383,0.00007918788,0.90582585,0.0125135025,0.0099162115,0.0036930626,0.06710223],"study_design_scores_gemma":[0.0000048479465,0.000033351986,0.0001348323,0.0000075488397,0.00000765588,0.000019842999,0.0000044323497,0.9950782,0.00071452546,0.0016364319,0.0023515937,0.0000066343746],"about_ca_topic_score_codex":0.0023931102,"about_ca_topic_score_gemma":0.0025368133,"teacher_disagreement_score":0.006190983,"about_ca_system_score_codex":0.00035874007,"about_ca_system_score_gemma":0.00042507058,"threshold_uncertainty_score":0.020710886},"labels":[],"label_agreement":null},{"id":"W1493729624","doi":"10.1109/pes.2004.1373120","title":"Optimal reactive power allocation in a wind powered doubly-fed induction generator","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"AC power; Converters; Power factor; Control theory (sociology); Induction generator; Compensation (psychology); Power (physics); Power control; Rotor (electric); Generator (circuit theory); Wind power; Computer science; Engineering; Electrical engineering; Control (management); Voltage; Physics","score_opus":0.006459663210952968,"score_gpt":0.20115161345706872,"score_spread":0.19469195024611574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1493729624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3158976,0.00053797395,0.66846234,0.0003552123,0.00010324327,0.00012514532,0.00009025673,0.0005093306,0.013918868],"genre_scores_gemma":[0.988318,0.00007473915,0.0103884805,0.00002104218,0.000012215617,0.000020534695,0.000013387092,0.00001417761,0.0011372345],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998276,0.000059873364,0.000010495407,0.000027071614,0.000056608515,0.000018348515],"domain_scores_gemma":[0.99978966,0.00007848701,0.00006426895,0.0000106312045,0.00004261738,0.000014356076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030042813,0.0004911749,0.0004954795,0.00025804233,0.0003129322,0.00092099427,0.00046153236,0.00054942555,0.0009775413],"category_scores_gemma":[0.0006020843,0.0003769042,0.00013778989,0.00025557526,0.0005040262,0.00035098108,0.00021124289,0.00032180973,0.00023116634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039198328,0.00008458441,0.0005261282,0.00010818325,0.00003502292,0.00026903205,0.00007186799,0.9228809,0.030318186,0.010007421,0.0007013408,0.03460525],"study_design_scores_gemma":[0.00004757505,0.0001545223,0.00019966697,0.0000043585287,0.000014547382,0.000028945136,0.000009015531,0.9950411,0.0015635779,0.0025460965,0.00038375016,0.000006867163],"about_ca_topic_score_codex":0.001429657,"about_ca_topic_score_gemma":0.0020572413,"teacher_disagreement_score":0.001429657,"about_ca_system_score_codex":0.00045576468,"about_ca_system_score_gemma":0.00031330623,"threshold_uncertainty_score":0.0033068657},"labels":[],"label_agreement":null},{"id":"W1523828004","doi":"10.1109/pes.2004.1373088","title":"Status of Gulf co-operation council (GCC) electricity grid system interconnection","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Interconnection; Electricity; Grid; Power grid; Telecommunications; Business; Engineering; Power (physics); Geography; Electrical engineering","score_opus":0.00795472724828926,"score_gpt":0.1909120970938541,"score_spread":0.18295736984556482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1523828004","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67432326,0.03892712,0.0062828716,0.02857672,0.0011960714,0.0001254294,0.0012267813,0.0005157871,0.24882604],"genre_scores_gemma":[0.9706753,0.016245529,0.0050084176,0.0009336708,0.00017197056,0.00003638331,0.00095465657,0.00006180021,0.0059122555],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986765,0.00038907526,0.000089015244,0.00011737402,0.00048310886,0.00024492914],"domain_scores_gemma":[0.9948484,0.00051804015,0.00079247594,0.0002427393,0.0030694637,0.0005289164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023626247,0.0004210733,0.00020110807,0.0016600167,0.0012564432,0.0039470955,0.0005865476,0.00112991,0.0031659475],"category_scores_gemma":[0.0058507593,0.00014557925,0.00016831412,0.003751575,0.0010959102,0.0018592611,0.001064238,0.0007503189,0.00034970252],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006388032,0.00019839112,0.20741032,0.0012728602,0.0001290678,0.0017425285,0.00286075,0.03198689,0.005430738,0.10937374,0.048575293,0.5903805],"study_design_scores_gemma":[0.000107494736,0.0007260488,0.24626088,0.002515935,0.00024575397,0.0017046242,0.012811456,0.018027786,0.0060955463,0.019199265,0.6921743,0.00013094397],"about_ca_topic_score_codex":0.036277667,"about_ca_topic_score_gemma":0.038060494,"teacher_disagreement_score":0.036277667,"about_ca_system_score_codex":0.0029819768,"about_ca_system_score_gemma":0.004336183,"threshold_uncertainty_score":0.072133005},"labels":[],"label_agreement":null},{"id":"W1534852015","doi":"10.1109/pes.2004.1373066","title":"Allocation of transmission capacity in the central America electricity market","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"Electricity market; Electricity; Transmission (telecommunications); Common value auction; Electric power transmission; Business; Point (geometry); Industrial organization; Environmental economics; Computer science; Economics; Telecommunications; Microeconomics; Engineering; Electrical engineering","score_opus":0.006406651754228939,"score_gpt":0.1832829415247242,"score_spread":0.17687628977049527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1534852015","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72493964,0.00092522736,0.14102714,0.0020409361,0.000085036736,0.00023854055,0.00019022771,0.00027755063,0.13027567],"genre_scores_gemma":[0.9837307,0.00018155332,0.010567625,0.00007440289,0.000015922607,0.00005903134,0.000024874924,0.000022063366,0.0053238524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990694,0.00047478147,0.000021658952,0.000106199856,0.00014633247,0.00018158183],"domain_scores_gemma":[0.9991949,0.00038616458,0.00009941761,0.0000647871,0.0001330253,0.000121615834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014681371,0.0004149343,0.00064560893,0.00072307687,0.0008952002,0.0034227252,0.001169688,0.0010058273,0.005150758],"category_scores_gemma":[0.0034133564,0.00063202094,0.0003819706,0.0011612439,0.001810629,0.0023943037,0.0014151332,0.0010028878,0.00020761647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032727988,0.00016473813,0.0014707068,0.000093002425,0.00007367594,0.00042846033,0.00037574908,0.5093961,0.00363799,0.4494516,0.0046673086,0.029913442],"study_design_scores_gemma":[0.00027137456,0.00019601932,0.001968896,0.000039677336,0.000051216444,0.00023987466,0.00073205837,0.84597385,0.0013681536,0.1416202,0.0074804015,0.000058203776],"about_ca_topic_score_codex":0.010822848,"about_ca_topic_score_gemma":0.02323588,"teacher_disagreement_score":0.010822848,"about_ca_system_score_codex":0.0028024057,"about_ca_system_score_gemma":0.002060352,"threshold_uncertainty_score":0.02151972},"labels":[],"label_agreement":null},{"id":"W1536430162","doi":"10.1109/pes.2004.1372834","title":"Assessment of high voltage auto-transformer spare requirements in bulk transmission systems","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Autotransformer; Reliability engineering; Unavailability; Computer science; Electricity; Engineering; Voltage; Operations management; Transformer; Electrical engineering","score_opus":0.007341018452248082,"score_gpt":0.225669800912643,"score_spread":0.21832878246039492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1536430162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89734536,0.00019229086,0.09884346,0.00005215234,0.00000425348,0.000048580416,0.00016446113,0.00010440594,0.00324504],"genre_scores_gemma":[0.9965699,0.00004582417,0.0030901686,0.000003024271,0.0000022497807,0.000008225848,0.00004875376,0.000009064196,0.00022277515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921536,0.00026703152,0.000024483643,0.00005522149,0.000376368,0.00006136046],"domain_scores_gemma":[0.99699473,0.0021311175,0.00043464365,0.000103531514,0.00027216715,0.000063856714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011198678,0.0007683808,0.00038041963,0.00087960286,0.00016400317,0.00055435067,0.0004774466,0.00047561983,0.0010402739],"category_scores_gemma":[0.003633868,0.00027176333,0.00031485554,0.0004150977,0.0003684498,0.0008635766,0.00045720435,0.00029202804,0.00013291158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002870756,0.00003067079,0.005527797,0.00006148546,0.000024655534,0.000258022,0.000057110512,0.9678817,0.012563924,0.0015365458,0.00011876093,0.011652316],"study_design_scores_gemma":[0.00002191543,0.00068076525,0.012091229,0.000016638136,0.000035456324,0.00048072264,0.00011989515,0.97399193,0.008000869,0.004219422,0.0003168749,0.000024285855],"about_ca_topic_score_codex":0.0011822591,"about_ca_topic_score_gemma":0.0013764375,"teacher_disagreement_score":0.0011822591,"about_ca_system_score_codex":0.00054937025,"about_ca_system_score_gemma":0.00026805673,"threshold_uncertainty_score":0.0059224963},"labels":[],"label_agreement":null},{"id":"W1539845155","doi":"10.1109/pes.2004.1373204","title":"Hopf bifurcations and critical mode damping of power systems for different static load models","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Control theory (sociology); Constant (computer programming); Electric power system; Hopf bifurcation; Work (physics); Power (physics); Oscillation (cell signaling); Damping ratio; Mode (computer interface); Eigenvalues and eigenvectors; Electrical impedance; Magnetic damping; Mechanics; Physics; Computer science; Engineering; Vibration; Bifurcation; Control (management); Acoustics; Mechanical engineering; Electrical engineering; Nonlinear system","score_opus":0.012122123465275355,"score_gpt":0.2414737697011766,"score_spread":0.22935164623590124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1539845155","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96037,0.00059927313,0.032003004,0.00016967652,0.000026244585,0.000027047483,0.00008735681,0.0002530259,0.006464396],"genre_scores_gemma":[0.9986749,0.00015228668,0.000846412,0.0000033789204,0.0000037879236,0.000010625794,0.000024023437,0.00001305347,0.00027155777],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998099,0.000050572933,0.000009575174,0.00002392122,0.00006325029,0.00004273465],"domain_scores_gemma":[0.9987379,0.0008572154,0.00015351534,0.00008576172,0.00009970494,0.00006600333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057459035,0.00051112345,0.00041524568,0.00090295635,0.0003839969,0.0004922098,0.0003073273,0.00029735398,0.0019047508],"category_scores_gemma":[0.0036688957,0.00021646023,0.00047771406,0.00025641854,0.00053623674,0.00082645414,0.00041750754,0.00041519525,0.00015062212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011392157,0.00024788975,0.007898303,0.0004984664,0.00014390855,0.00070919405,0.0012098199,0.7414734,0.15834512,0.045491103,0.0016074107,0.041236162],"study_design_scores_gemma":[0.000045365367,0.00022971212,0.003716095,0.000030819792,0.00004777721,0.00012571806,0.00018452044,0.9647003,0.019258477,0.011193236,0.00043739867,0.000030561812],"about_ca_topic_score_codex":0.0011468083,"about_ca_topic_score_gemma":0.000997906,"teacher_disagreement_score":0.0019047508,"about_ca_system_score_codex":0.0004170366,"about_ca_system_score_gemma":0.00019674932,"threshold_uncertainty_score":0.0063720345},"labels":[],"label_agreement":null},{"id":"W1540107160","doi":"10.1109/pes.2004.1372965","title":"An intelligent substation design environment","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Systems and Technologies","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Hydro-Québec; BC Hydro (Canada)","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Computer science; Principal (computer security); Voltage; Line (geometry); Engineering; Electrical engineering","score_opus":0.010320708513869105,"score_gpt":0.20025468488006679,"score_spread":0.1899339763661977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1540107160","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012258383,0.00016849901,0.92913014,0.00011189942,0.00007210211,0.00010131343,0.0014049615,0.034934092,0.03285108],"genre_scores_gemma":[0.03243611,0.0007618408,0.87557334,0.00022383759,0.00010249303,0.00068916864,0.009670601,0.007481365,0.073061295],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992193,0.00014639604,0.00008168169,0.0001366521,0.0003738072,0.0000421849],"domain_scores_gemma":[0.99936515,0.00024009852,0.00004624916,0.00015206877,0.00014357489,0.00005296564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011102918,0.001068408,0.0007864727,0.0011826904,0.0004828891,0.0021511908,0.0017398669,0.00087161805,0.099552855],"category_scores_gemma":[0.0019109442,0.0007162907,0.0006093949,0.0010574991,0.00031461427,0.0017231044,0.0015087144,0.0010503848,0.032226667],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041027027,0.00017415163,0.00079991115,0.00069079973,0.00007592161,0.00046612593,0.00047714563,0.050200976,0.018623047,0.08351442,0.16673517,0.67783207],"study_design_scores_gemma":[0.00012530379,0.00006324643,0.00028024873,0.00011802553,0.000043435648,0.00033547138,0.000031595253,0.11355598,0.0069360044,0.023176081,0.85529757,0.00003697881],"about_ca_topic_score_codex":0.00060074707,"about_ca_topic_score_gemma":0.0009520412,"teacher_disagreement_score":0.099552855,"about_ca_system_score_codex":0.0004437156,"about_ca_system_score_gemma":0.0005548561,"threshold_uncertainty_score":0.3330375},"labels":[],"label_agreement":null},{"id":"W1551858500","doi":"10.1109/pes.2004.1372878","title":"A study on the optimal reliability criteria decision for a transmission system expansion planning","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Electric power system; Electricity market; Transmission (telecommunications); Constraint (computer-aided design); Grid; Total cost; Transmission system; Business system planning; Operations research; Mathematical optimization; Electricity; Engineering; Power (physics); Economics; Mathematics; Telecommunications","score_opus":0.013582685038198428,"score_gpt":0.25049578306023706,"score_spread":0.23691309802203864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1551858500","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11934026,0.0020752952,0.83118045,0.0012768451,0.00009561956,0.00017406151,0.00007634173,0.000061146464,0.04572001],"genre_scores_gemma":[0.8733207,0.0015719043,0.120185904,0.00008252,0.000121574485,0.00009668695,0.00004775991,0.000048806138,0.004524089],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984518,0.00095073605,0.000042524327,0.00014379321,0.0002955816,0.0001156156],"domain_scores_gemma":[0.9943268,0.004708379,0.0002860029,0.00010709318,0.00047700966,0.000094804775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030293886,0.0005713734,0.0005436813,0.00089002954,0.00051293947,0.0015386459,0.0005285091,0.0009129851,0.0031160584],"category_scores_gemma":[0.009376158,0.00050151,0.0008095256,0.00090244145,0.0010607843,0.0014177624,0.0004203776,0.0013991412,0.00016119237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008841174,0.000081984406,0.0008548155,0.00014844438,0.000032507494,0.00026098284,0.00015282781,0.823997,0.0029414997,0.14296328,0.0012224568,0.02725571],"study_design_scores_gemma":[0.00001662884,0.00016435681,0.0006608947,0.000035265017,0.000025978401,0.00009781434,0.00008716064,0.9696564,0.0009221604,0.02646328,0.0018537196,0.000016288495],"about_ca_topic_score_codex":0.0049970183,"about_ca_topic_score_gemma":0.0036639122,"teacher_disagreement_score":0.0049970183,"about_ca_system_score_codex":0.0016219134,"about_ca_system_score_gemma":0.0013499213,"threshold_uncertainty_score":0.016021132},"labels":[],"label_agreement":null},{"id":"W1560801891","doi":"10.1109/pes.2004.1373171","title":"Power quality control of hybrid wind power generation with battery storage using fuzzy-LQR controller","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Control theory (sociology); Linear-quadratic regulator; Controller (irrigation); Fuzzy logic; Fuzzy control system; Wind power; Control engineering; Computer science; Power (physics); PID controller; Engineering; Control (management); Temperature control","score_opus":0.010567214476574983,"score_gpt":0.21752822613751538,"score_spread":0.20696101166094039,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1560801891","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.072847374,0.00035736733,0.92276466,0.00014212447,0.000066527646,0.000052446176,0.000034337656,0.00070313324,0.003032035],"genre_scores_gemma":[0.9841748,0.000090103546,0.014896664,0.000024126011,0.000019595798,0.000047351088,0.00002066112,0.000016071142,0.0007106224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997502,0.00007033611,0.000016401294,0.000049010392,0.00009023138,0.000023735887],"domain_scores_gemma":[0.9997292,0.00009269608,0.000059777783,0.000016880469,0.000090374684,0.000011074051],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006546184,0.0005093373,0.0006156288,0.0001773544,0.00026346004,0.0008208902,0.0005351931,0.0003328641,0.0009913236],"category_scores_gemma":[0.0006649477,0.00023138837,0.00028878203,0.00017501178,0.00037162218,0.00052650395,0.00032027753,0.00043993143,0.000230472],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004560289,0.00014945789,0.00095616526,0.00030725522,0.00012682223,0.00023412204,0.0002834213,0.81509405,0.05061347,0.0070900787,0.0013749963,0.12331418],"study_design_scores_gemma":[0.00005543681,0.00012516133,0.00020365734,0.0000052229634,0.000013651285,0.000019187795,0.000009509732,0.9966407,0.0018147324,0.000718847,0.00038738776,0.0000064847777],"about_ca_topic_score_codex":0.0026496677,"about_ca_topic_score_gemma":0.0023013768,"teacher_disagreement_score":0.0026496677,"about_ca_system_score_codex":0.00033208844,"about_ca_system_score_gemma":0.00024137292,"threshold_uncertainty_score":0.0052684546},"labels":[],"label_agreement":null},{"id":"W1563793854","doi":"10.1109/pes.2004.1372867","title":"The blackout sequence of events","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Seismology and Earthquake Studies","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Event (particle physics); Computer science; Power (physics); Electric power system; Physics","score_opus":0.010262444354899878,"score_gpt":0.22755938746412177,"score_spread":0.2172969431092219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1563793854","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025432868,0.011511001,0.007479173,0.013019961,0.028851217,0.0028581263,0.3336486,0.0033067341,0.5738924],"genre_scores_gemma":[0.164039,0.010163586,0.0047851084,0.0064537483,0.0042193774,0.001550058,0.21520925,0.00064760767,0.59293234],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9993968,0.000073406816,0.00008036276,0.00011226824,0.0002617474,0.00007531462],"domain_scores_gemma":[0.9979467,0.00024180023,0.00023864224,0.00013342033,0.001133624,0.0003058569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051530276,0.00057080324,0.0005539205,0.0013007171,0.00079381873,0.0013237913,0.0005188754,0.0006714192,0.22457756],"category_scores_gemma":[0.0033435742,0.00019135886,0.00027228854,0.001426563,0.00017086578,0.00064374326,0.00086009514,0.0008759262,0.07933102],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040485503,0.000039372197,0.0053164973,0.00080194185,0.00001714824,0.0002776304,0.00012644158,0.00027841338,0.00066682696,0.0019718765,0.85185856,0.1382405],"study_design_scores_gemma":[0.000039286493,0.00019200201,0.030684857,0.0004315553,0.000016107806,0.00027367173,0.00024255573,0.00013413171,0.0005086337,0.0014150194,0.9660429,0.000019308955],"about_ca_topic_score_codex":0.007329232,"about_ca_topic_score_gemma":0.017029434,"teacher_disagreement_score":0.22457756,"about_ca_system_score_codex":0.00074449315,"about_ca_system_score_gemma":0.0011735153,"threshold_uncertainty_score":0.7512868},"labels":[],"label_agreement":null},{"id":"W1570817337","doi":"10.1109/pes.2004.1373161","title":"Performance of \"WAMS East\" in providing dynamic information for the North East blackout of August 14, 2003","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Seismic Waves and Analysis","field":"Earth and Planetary Sciences","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"University of Alberta","keywords":"Blackout; Electric power system; Phasor; Task (project management); Interconnection; Computer science; Work (physics); Event (particle physics); Global Positioning System; Units of measurement; Engineering; Telecommunications; Systems engineering; Power (physics)","score_opus":0.005638326056985844,"score_gpt":0.1809929765261192,"score_spread":0.17535465046913337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1570817337","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97240776,0.00017804884,0.0016623928,0.0013204811,0.00005234531,0.00010682191,0.001303393,0.0019538298,0.021014769],"genre_scores_gemma":[0.9827581,0.00021080744,0.0031372826,0.00025102112,0.000031325093,0.000030187342,0.003146969,0.000120000084,0.010314362],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99896574,0.00022195825,0.000072616356,0.00018027774,0.00038712865,0.00017218718],"domain_scores_gemma":[0.9955434,0.0007167767,0.00026970825,0.0006349591,0.002440133,0.00039495257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002313994,0.00029347048,0.000242472,0.00070270296,0.0010418766,0.0018136754,0.0004947402,0.0004687231,0.0040538334],"category_scores_gemma":[0.009081308,0.00021737067,0.00010610815,0.001236422,0.00044881203,0.001880993,0.0014182682,0.00041444352,0.0018563777],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0043194187,0.0005604895,0.25859115,0.00024112103,0.00011607727,0.0012210466,0.00801908,0.016379042,0.0238564,0.0042845868,0.105891414,0.5765202],"study_design_scores_gemma":[0.00036464442,0.0019305322,0.5970607,0.00024303368,0.00015716984,0.0007515052,0.022428887,0.11268154,0.044643693,0.001549854,0.21800609,0.0001824242],"about_ca_topic_score_codex":0.11000357,"about_ca_topic_score_gemma":0.20672655,"teacher_disagreement_score":0.11000357,"about_ca_system_score_codex":0.0015770001,"about_ca_system_score_gemma":0.0025106596,"threshold_uncertainty_score":0.21872652},"labels":[],"label_agreement":null},{"id":"W1571165107","doi":"10.1109/pes.2004.1372866","title":"Anatomy of the blackout investigation","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Systems and Technologies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Task (project management); Task force; Prime minister; Aeronautics; Joint (building); Computer science; Operations research; Prime (order theory); Power (physics); Electrical engineering; Telecommunications; Electric power system; Computer security; Engineering; Simulation; Artificial intelligence; Political science; Structural engineering; Mathematics; Law; Systems engineering; Physics","score_opus":0.005428160400050282,"score_gpt":0.1961120521250072,"score_spread":0.19068389172495692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1571165107","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056006946,0.013178489,0.029227218,0.038482398,0.007745321,0.0010073994,0.0014829795,0.00089104194,0.9023845],"genre_scores_gemma":[0.1377684,0.016429989,0.020427091,0.014976105,0.003678679,0.0008579495,0.0018375503,0.0007932224,0.80323094],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977857,0.0006097209,0.00014260947,0.00029586846,0.00081378996,0.0003522832],"domain_scores_gemma":[0.99656314,0.0011329057,0.00026186393,0.00038582468,0.0013203932,0.00033596894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003315943,0.00042541837,0.00042815454,0.0021183607,0.0031824412,0.0042258347,0.0012072116,0.002338611,0.07500949],"category_scores_gemma":[0.010497756,0.0004351452,0.00042697156,0.001555108,0.0026214398,0.0033740958,0.003279981,0.0028949413,0.034988727],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015016965,0.000059268114,0.002255195,0.00040092968,0.000007882229,0.0019954767,0.0026253734,0.0003812004,0.0011198986,0.36160696,0.38175765,0.24764006],"study_design_scores_gemma":[0.0000050647222,0.000029894873,0.001467619,0.00033101861,0.0000048994916,0.000634774,0.0007571995,0.00013181183,0.0002929026,0.025283754,0.9710506,0.000010566453],"about_ca_topic_score_codex":0.0056674248,"about_ca_topic_score_gemma":0.0062504816,"teacher_disagreement_score":0.07500949,"about_ca_system_score_codex":0.00289167,"about_ca_system_score_gemma":0.004854756,"threshold_uncertainty_score":0.25093174},"labels":[],"label_agreement":null},{"id":"W1592433749","doi":"10.1109/pes.2004.1372871","title":"Overview of recommendations by U.S. - Canada task force to prevent or minimize scope of future blackouts","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Healthcare Operations and Scheduling Optimization","field":"Health Professions","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Task force; Interim; Scope (computer science); Task (project management); Operations research; Computer science; Aeronautics; Political science; Engineering; Public administration; Law; Systems engineering","score_opus":0.024159791857006223,"score_gpt":0.3440077830231037,"score_spread":0.31984799116609747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1592433749","genre_codex":"commentary","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036364943,0.21298008,0.03332356,0.31191832,0.06240524,0.021853976,0.09062309,0.0038592508,0.2594],"genre_scores_gemma":[0.022425607,0.37596396,0.102457374,0.08851565,0.012534523,0.01677431,0.07752254,0.0011111108,0.30269492],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9904454,0.0012660089,0.0011734657,0.00039004668,0.0056456476,0.0010793955],"domain_scores_gemma":[0.93261737,0.0037792025,0.0028692696,0.00043818905,0.057059992,0.003235984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01299829,0.002733845,0.0017862031,0.010298202,0.0036157642,0.0040849317,0.006526753,0.0069237705,0.023000348],"category_scores_gemma":[0.024334485,0.0012951721,0.0020037289,0.009857123,0.0012771239,0.0025023513,0.0013812003,0.005568459,0.014523139],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032078267,0.000079344885,0.00068964245,0.0013374673,0.000020286088,0.000073060815,0.00009382474,0.000986116,0.00023087345,0.00063443504,0.9340364,0.061786402],"study_design_scores_gemma":[0.00006605096,0.000096462056,0.008549415,0.0073564798,0.00012472991,0.00008860759,0.0005115397,0.0006300575,0.00041468197,0.001328434,0.9807163,0.000117207666],"about_ca_topic_score_codex":0.65066123,"about_ca_topic_score_gemma":0.68760794,"teacher_disagreement_score":0.98343664,"about_ca_system_score_codex":0.016563334,"about_ca_system_score_gemma":0.11700021,"threshold_uncertainty_score":0.70279217},"labels":[],"label_agreement":null},{"id":"W1594721147","doi":"10.1109/pes.2004.1372902","title":"Failure rates of air blast breakers","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electrical Fault Detection and Protection","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Circuit breaker; Distribution board; Reliability engineering; Reliability (semiconductor); Failure rate; Air blast; Sulfur hexafluoride circuit breaker; Engineering; Disconnector; Maintenance engineering; Computer science; Electrical engineering; Voltage; Automotive engineering; Short circuit; Arc-fault circuit interrupter; Power (physics); Physics","score_opus":0.004392671905593274,"score_gpt":0.20669093177443462,"score_spread":0.20229825986884134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1594721147","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87082124,0.006598866,0.01459924,0.000448747,0.000369609,0.00013497048,0.077640496,0.0014591542,0.027927695],"genre_scores_gemma":[0.9639364,0.0008076309,0.0005358818,0.000036303278,0.000109218905,0.00005239631,0.01866472,0.000085260035,0.015772352],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988599,0.00015172194,0.00007441933,0.000270157,0.00053781277,0.00010593171],"domain_scores_gemma":[0.9922659,0.0041839615,0.0011534775,0.0007277691,0.0014013596,0.0002676428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009511712,0.0002916341,0.00041939694,0.002641894,0.00019417334,0.00039113933,0.0005830142,0.0005238526,0.020714419],"category_scores_gemma":[0.0055948202,0.00010136474,0.00027688342,0.0009492678,0.00014570203,0.00034675637,0.00018989948,0.00028304665,0.006878476],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0048807836,0.00026579518,0.3582947,0.0012767364,0.000585932,0.0010217978,0.00074815593,0.061327863,0.022803094,0.0031597584,0.1222497,0.42338577],"study_design_scores_gemma":[0.0001423968,0.0035832454,0.8757751,0.00020345411,0.00023379446,0.001860075,0.00023947435,0.026673736,0.026289472,0.0027141098,0.06216138,0.00012381657],"about_ca_topic_score_codex":0.00096871954,"about_ca_topic_score_gemma":0.0008012067,"teacher_disagreement_score":0.020714419,"about_ca_system_score_codex":0.00027527596,"about_ca_system_score_gemma":0.00009385985,"threshold_uncertainty_score":0.06929666},"labels":[],"label_agreement":null},{"id":"W1642458343","doi":"10.1109/pes.2004.1373107","title":"Communications for a large distribution automation project in Thailand","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Line Communications and Noise","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada)","funders":"","keywords":"SCADA; Telecommunications; Engineering; Process automation system; Automation; Communications system; Project commissioning; Work (physics); Systems engineering; Electrical engineering; Publishing","score_opus":0.013809942503065845,"score_gpt":0.259585221663179,"score_spread":0.24577527916011316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1642458343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75064516,0.0016475117,0.024163332,0.0032394435,0.00019742415,0.00066140253,0.0012428672,0.0010928233,0.21711004],"genre_scores_gemma":[0.8652213,0.0012567799,0.014307347,0.00021004443,0.000058291418,0.00032282688,0.0011226952,0.00010108121,0.11739968],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957687,0.00014094246,0.00001598086,0.000041602718,0.00014730608,0.000077351426],"domain_scores_gemma":[0.99877304,0.00021615402,0.000117988064,0.00006826932,0.0003355681,0.00048899284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056697783,0.0003518761,0.000079560494,0.0005127594,0.0013400804,0.00137352,0.00021797775,0.00026852638,0.00810737],"category_scores_gemma":[0.0007198622,0.00016975097,0.000089954694,0.0010285205,0.00027712033,0.0005306109,0.0008303591,0.00043443375,0.0014993587],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012170147,0.0011032867,0.052267253,0.0008782899,0.000056916684,0.012879081,0.016341489,0.016150879,0.072182566,0.033040307,0.06540306,0.72847986],"study_design_scores_gemma":[0.00037835454,0.0019279554,0.11416883,0.0002085254,0.000065019056,0.00889062,0.0137944305,0.015625935,0.033755142,0.004455753,0.8066205,0.00010893056],"about_ca_topic_score_codex":0.011973452,"about_ca_topic_score_gemma":0.011518281,"teacher_disagreement_score":0.011973452,"about_ca_system_score_codex":0.001015257,"about_ca_system_score_gemma":0.0045141038,"threshold_uncertainty_score":0.027121842},"labels":[],"label_agreement":null},{"id":"W1658314833","doi":"10.1109/pes.2004.1373149","title":"PEM fuel cells for improved grid reliability and power transfer","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Fuel Cells and Related Materials","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Ballard Power Systems (Canada)","funders":"","keywords":"Proton exchange membrane fuel cell; Grid; Reliability (semiconductor); Energy storage; Computer science; Battery (electricity); Fuel cells; Reliability engineering; Work (physics); Power (physics); Maximum power transfer theorem; Automotive engineering; Electrical engineering; Engineering; Mechanical engineering","score_opus":0.0038217466056501095,"score_gpt":0.1815011944769491,"score_spread":0.177679447871299,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1658314833","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21758603,0.0153948,0.67800826,0.0052952874,0.00065271003,0.00015646228,0.00077463564,0.0023482216,0.07978361],"genre_scores_gemma":[0.9174655,0.006403273,0.054245677,0.00020129136,0.000076004566,0.00007025386,0.00034503773,0.000064411906,0.021128591],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9999244,0.00001587681,0.0000015828697,0.000012090795,0.00003832021,0.000007843687],"domain_scores_gemma":[0.99995935,0.000009276212,0.000004376861,0.000009219987,0.0000149817515,0.0000026773796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013423839,0.00026300352,0.00022611917,0.00011709808,0.00017516236,0.00033978265,0.00046587604,0.0004977965,0.001996327],"category_scores_gemma":[0.0002749059,0.00009847026,0.00018503635,0.00020121242,0.00016170423,0.0006595992,0.0002750729,0.0004217799,0.00045832078],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002670343,0.00012058129,0.0013019551,0.00045627952,0.000050968396,0.00038168347,0.00013816876,0.38604552,0.107401915,0.25625128,0.01709836,0.2304862],"study_design_scores_gemma":[0.00004572625,0.00016186122,0.00057623605,0.000037389716,0.000020770838,0.00024992067,0.000052725238,0.8188113,0.045754433,0.054205693,0.08005955,0.000024431141],"about_ca_topic_score_codex":0.00137509,"about_ca_topic_score_gemma":0.0018455777,"teacher_disagreement_score":0.001996327,"about_ca_system_score_codex":0.00034644743,"about_ca_system_score_gemma":0.00028239406,"threshold_uncertainty_score":0.0066784024},"labels":[],"label_agreement":null},{"id":"W1739183808","doi":"10.1109/pes.2004.1372770","title":"Reliability evaluation of the IEEE-RTS incorporating station related outages","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Transmission system; Computer science; Engineering; Transmission (telecommunications); Telecommunications","score_opus":0.00870969827875118,"score_gpt":0.22043031899110127,"score_spread":0.2117206207123501,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1739183808","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96432155,0.00006805092,0.029951246,0.000028091492,0.000013894168,0.000043324413,0.00021760724,0.00034684248,0.005009496],"genre_scores_gemma":[0.9951998,0.00003592812,0.0037384212,0.0000045598053,0.0000067675373,0.000013071818,0.00014815354,0.000030091556,0.00082319975],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991875,0.0003642196,0.00003924766,0.00006247891,0.0002886247,0.000057823894],"domain_scores_gemma":[0.9971758,0.0013432933,0.0002298951,0.00035261462,0.00082235463,0.00007602727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014691532,0.00061647076,0.000332249,0.00060582993,0.00017145445,0.00032672315,0.0005506489,0.00033922773,0.0019800947],"category_scores_gemma":[0.0040316163,0.00017571241,0.00039589524,0.0006775535,0.00034491715,0.0006064475,0.00032224815,0.00046298714,0.00034470446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019937386,0.00031927435,0.009929455,0.00017538825,0.00013208746,0.0005242915,0.00016362334,0.8519918,0.09008316,0.0033325455,0.0009529881,0.040401712],"study_design_scores_gemma":[0.00008589235,0.0031756621,0.01819205,0.000012365887,0.00016481167,0.0002844528,0.00007696089,0.92504704,0.050478198,0.0009759956,0.0014727982,0.00003375808],"about_ca_topic_score_codex":0.0018799424,"about_ca_topic_score_gemma":0.0016925032,"teacher_disagreement_score":0.0019800947,"about_ca_system_score_codex":0.00046427187,"about_ca_system_score_gemma":0.00025055915,"threshold_uncertainty_score":0.007769704},"labels":[],"label_agreement":null},{"id":"W1819216207","doi":"10.1109/pes.2004.1373145","title":"Undervoltage load shedding scheme for the Hydro-Quebec system","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Tripping; Load Shedding; Upgrade; Reliability (semiconductor); Reliability engineering; Transmission system; Engineering; Scheme (mathematics); Overvoltage; Electric power transmission; Work (physics); Transmission (telecommunications); Computer science; Electric power system; Voltage; Circuit breaker; Electrical engineering","score_opus":0.007249222453695179,"score_gpt":0.204918512296129,"score_spread":0.19766928984243382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1819216207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9495741,0.00016076247,0.035904408,0.0003733495,0.000045913184,0.00013885964,0.0001939937,0.0003013693,0.013307174],"genre_scores_gemma":[0.9961397,0.000027922759,0.0017185955,0.00001464446,0.0000036112979,0.000009460405,0.000036797737,0.000003079888,0.002046255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99993277,0.000011578073,0.000001912919,0.000011600985,0.000018358096,0.000023738345],"domain_scores_gemma":[0.999926,0.000008400531,0.000013622126,0.000006517649,0.000028853667,0.000016681743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000119773424,0.0002855939,0.00016088327,0.00018192182,0.000613607,0.00042869346,0.00035207171,0.00018455583,0.0018658281],"category_scores_gemma":[0.00017506738,0.000055271874,0.00007839332,0.00017127422,0.0003558899,0.00015612847,0.0002335254,0.00022720188,0.00008432991],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014381316,0.0002920382,0.00675436,0.00017783415,0.000065943255,0.0012161072,0.0003972617,0.664253,0.15621687,0.023623079,0.0065572257,0.13900816],"study_design_scores_gemma":[0.00018138505,0.00058807805,0.007563818,0.000008949626,0.000028472603,0.000091890186,0.00010005596,0.9713892,0.013125344,0.0018892683,0.005005442,0.00002808003],"about_ca_topic_score_codex":0.26921812,"about_ca_topic_score_gemma":0.3527775,"teacher_disagreement_score":0.26921812,"about_ca_system_score_codex":0.0021928584,"about_ca_system_score_gemma":0.0012482955,"threshold_uncertainty_score":0.53530216},"labels":[],"label_agreement":null},{"id":"W1822002551","doi":"10.1109/pes.2004.1373278","title":"Tie line equivalent constrained assisting generator model (TEAG) considering forced outage rates of transmission systems-II","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Tie line; Transmission line; Electric power transmission; Electric power system; Generator (circuit theory); Computer science; Reliability engineering; Transmission (telecommunications); Transmission system; Line (geometry); Power (physics); Point (geometry); Power transmission; Simple (philosophy); Control theory (sociology); Engineering; Electrical engineering; Mathematics; Telecommunications; Control (management)","score_opus":0.015912362765103025,"score_gpt":0.23147299432303925,"score_spread":0.21556063155793623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1822002551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08096474,0.00033819381,0.8789994,0.00056481035,0.000104638995,0.00016774898,0.0009836456,0.0007560686,0.037120786],"genre_scores_gemma":[0.96695954,0.00029810533,0.022016311,0.00008898919,0.000041445626,0.00020834975,0.000375168,0.00009244,0.009919446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975616,0.000101084064,0.00000974264,0.000041648178,0.00006355604,0.000027808672],"domain_scores_gemma":[0.99961793,0.00018576396,0.0000696997,0.000034541386,0.00006919839,0.00002278422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034106604,0.0008883905,0.0008173309,0.00038363374,0.00036375716,0.0008913913,0.0017245798,0.0016338619,0.0036871417],"category_scores_gemma":[0.0014584069,0.000338451,0.00051542337,0.0005994953,0.00056225393,0.0011875944,0.0006015013,0.0009755921,0.0005220815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018102115,0.0000069132807,0.00009264496,0.000011983621,0.0000063155153,0.00008487945,0.000013551911,0.9934608,0.00035907727,0.0042150063,0.0002483352,0.0014823802],"study_design_scores_gemma":[0.0000069825574,0.00001118666,0.00004270007,0.0000016881875,0.0000030501335,0.000015077808,0.0000027321748,0.99839705,0.000059236492,0.0012360783,0.00022223315,0.000002023587],"about_ca_topic_score_codex":0.00636156,"about_ca_topic_score_gemma":0.004095088,"teacher_disagreement_score":0.00636156,"about_ca_system_score_codex":0.00041907362,"about_ca_system_score_gemma":0.00050660886,"threshold_uncertainty_score":0.012649119},"labels":[],"label_agreement":null},{"id":"W1824169754","doi":"10.1109/pes.2004.1373269","title":"Stochastic estimation of the contribution levels of customer operated distributed generation","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Distributed generation; Computer science; Stochastic process; Random variable; State (computer science); Expression (computer science); Stochastic modelling; Mathematics; Engineering; Statistics; Algorithm; Electrical engineering","score_opus":0.008027866107267943,"score_gpt":0.2145078402574038,"score_spread":0.20647997415013586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1824169754","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1083425,0.00006675112,0.8906379,0.00004554827,0.0000069969406,0.000023304196,0.000046054163,0.00018582746,0.00064520416],"genre_scores_gemma":[0.8707145,0.0000746357,0.12840386,0.000019296456,0.000012782002,0.00005728491,0.00020312922,0.000020330297,0.00049416756],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994531,0.00017654934,0.000021726926,0.000088520785,0.00021074463,0.000049345603],"domain_scores_gemma":[0.9981652,0.001091277,0.00024829106,0.000085312466,0.00034290348,0.000066981294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010375397,0.0004888163,0.00058365526,0.00066844205,0.00019497331,0.00069637765,0.0005904239,0.00043635894,0.00040618336],"category_scores_gemma":[0.00451792,0.0004094603,0.00036364867,0.00045037566,0.00040828827,0.00060157443,0.00066661334,0.0005239597,0.00011101207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060388422,0.00001938871,0.001961767,0.0000160314,0.000016627973,0.000019622328,0.000017824841,0.9769478,0.0016607,0.0026263099,0.000086147185,0.01656739],"study_design_scores_gemma":[0.0000021418666,0.000008441852,0.0002671656,0.000001059753,0.0000017338485,0.000006144665,0.000001571077,0.9985251,0.0005941258,0.0005489256,0.00004156073,0.000001997624],"about_ca_topic_score_codex":0.0015735332,"about_ca_topic_score_gemma":0.0016697438,"teacher_disagreement_score":0.0015735332,"about_ca_system_score_codex":0.0006160091,"about_ca_system_score_gemma":0.0007363492,"threshold_uncertainty_score":0.0054870844},"labels":[],"label_agreement":null},{"id":"W1827877219","doi":"10.1109/pes.2004.1372948","title":"Experiences in aggregating distributed generation for system benefit","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Bruce Power","keywords":"Dispatchable generation; Standby power; Electric power system; Electricity generation; Demand response; Computer science; Generator (circuit theory); Business; Power (physics); Electrical engineering; Reliability engineering; Distributed generation; Engineering; Electricity; Renewable energy","score_opus":0.007933430593306187,"score_gpt":0.2051679023230546,"score_spread":0.1972344717297484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1827877219","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27947137,0.003843024,0.28005832,0.02240556,0.0009810394,0.00041553073,0.00036121532,0.0019039186,0.41055992],"genre_scores_gemma":[0.9023382,0.0027122714,0.0628224,0.00093810103,0.00029795806,0.00009520523,0.0003221194,0.00018383678,0.030289942],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99884605,0.0006243918,0.000027740543,0.000076184966,0.00026670558,0.00015889779],"domain_scores_gemma":[0.998629,0.0005197386,0.00003751385,0.00028229618,0.000359607,0.00017182276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033626312,0.00050489075,0.00022426921,0.0003228924,0.0008979133,0.0023579448,0.0007913309,0.0007413635,0.0063929046],"category_scores_gemma":[0.0030035318,0.00015465419,0.0003291985,0.0009498418,0.00069495785,0.002436189,0.0014278941,0.0011774314,0.0011975061],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054402946,0.0007996279,0.008891312,0.000391608,0.00009518488,0.0016049183,0.0070849606,0.07450104,0.008514326,0.112962194,0.06623181,0.71837896],"study_design_scores_gemma":[0.00032411143,0.0018306131,0.005357908,0.00023044416,0.00010975873,0.0015501574,0.006182449,0.103055604,0.02093556,0.08888164,0.77144986,0.00009188079],"about_ca_topic_score_codex":0.002372271,"about_ca_topic_score_gemma":0.003004853,"teacher_disagreement_score":0.0063929046,"about_ca_system_score_codex":0.0008643611,"about_ca_system_score_gemma":0.00065402524,"threshold_uncertainty_score":0.021386385},"labels":[],"label_agreement":null},{"id":"W1830660145","doi":"10.1109/pes.2004.1372930","title":"On-line trained neurofuzzy distance relay with directional element","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Neural Networks and Applications","field":"Computer Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Relay; Fault (geology); Line (geometry); Transmission line; Fuzzy logic; Computer science; Electric power transmission; Protective relay; Control theory (sociology); Algorithm; Artificial intelligence; Engineering; Mathematics; Telecommunications; Electrical engineering; Geometry; Physics; Geology","score_opus":0.007683881583317229,"score_gpt":0.21580475514552916,"score_spread":0.20812087356221193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1830660145","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033947058,0.00013268263,0.9586861,0.00011103486,0.00009717328,0.00006788765,0.000042160722,0.0006898814,0.00622603],"genre_scores_gemma":[0.8427373,0.00009076307,0.15041013,0.000078213416,0.000032218697,0.00009391125,0.00006401926,0.000026099382,0.0064672264],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996978,0.0000577694,0.00002062308,0.00006512686,0.00013812941,0.000020541658],"domain_scores_gemma":[0.9997367,0.000056985762,0.000033437515,0.000040713854,0.00011689676,0.000015122349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035078335,0.00041070738,0.00048022604,0.00017710363,0.0002930726,0.0005556364,0.0012790432,0.0009036004,0.0022383356],"category_scores_gemma":[0.0007495272,0.00018882626,0.00026910944,0.00013722137,0.00028657963,0.0006661904,0.00049920566,0.00057858176,0.00061053067],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003540607,0.00011793556,0.00089405815,0.00018272594,0.00006629392,0.00023162451,0.00013517975,0.7285576,0.04585193,0.0106255645,0.0022344708,0.21074852],"study_design_scores_gemma":[0.000013744377,0.00009114892,0.00011964652,0.0000071803033,0.000013978419,0.000052816624,0.000005140456,0.99143934,0.0059280773,0.00046472228,0.0018558548,0.00000830581],"about_ca_topic_score_codex":0.0027664038,"about_ca_topic_score_gemma":0.004091212,"teacher_disagreement_score":0.0027664038,"about_ca_system_score_codex":0.0005897737,"about_ca_system_score_gemma":0.00053134555,"threshold_uncertainty_score":0.0074879527},"labels":[],"label_agreement":null},{"id":"W1857122105","doi":"10.1109/pes.2004.1373129","title":"Generating units aggregation for dynamic equivalent of large power systems","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Electric power system; Stability (learning theory); Computer science; Transient (computer programming); Basis (linear algebra); Control theory (sociology); Domain (mathematical analysis); Dynamic testing; Base (topology); Time domain; Power (physics); Algorithm; Mathematics; Control (management)","score_opus":0.008874309575853943,"score_gpt":0.22864223173489046,"score_spread":0.2197679221590365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1857122105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0057391003,0.000033090837,0.9930676,0.00001194075,0.000008529316,0.000014701821,0.000015731515,0.00012263823,0.0009865296],"genre_scores_gemma":[0.34936613,0.00017105787,0.64617276,0.000026381396,0.000055087155,0.000107212516,0.00028111468,0.0001805694,0.0036396158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997358,0.00008612787,0.000012653452,0.000043387765,0.000104905565,0.000017242783],"domain_scores_gemma":[0.9997396,0.0000956829,0.000032156084,0.00007103704,0.00005263832,0.000008812868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039211148,0.0005355332,0.00043649416,0.00043770976,0.00030305228,0.00051312556,0.00045231564,0.00020470005,0.0017223262],"category_scores_gemma":[0.0011733443,0.00019702659,0.00046391116,0.00043632815,0.0002495321,0.00076702994,0.0005206855,0.0006186848,0.00040278095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007980361,0.000050443614,0.0006700104,0.00010723429,0.000049253005,0.00022173366,0.00023181082,0.58397996,0.022838702,0.11502087,0.0020062635,0.27474385],"study_design_scores_gemma":[0.000006500533,0.000024583438,0.00017637038,0.000004835358,0.000010254568,0.00004399053,0.000013140632,0.9783473,0.0032004497,0.014274182,0.0038934036,0.0000049503465],"about_ca_topic_score_codex":0.0011913021,"about_ca_topic_score_gemma":0.0016969959,"teacher_disagreement_score":0.0017223262,"about_ca_system_score_codex":0.00026340425,"about_ca_system_score_gemma":0.00025119443,"threshold_uncertainty_score":0.005761802},"labels":[],"label_agreement":null},{"id":"W1866356858","doi":"10.1109/pes.2004.1372836","title":"Evaluation of live-line maintenance techniques used on BPA reduced clearance 500 kV lines","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"High voltage insulation and dielectric phenomena","field":"Materials Science","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Arc flash; Insulator (electricity); Conductor; Electric power transmission; High voltage; Transmission line; Engineering; Electrical engineering; Dielectric; Tower; Voltage; Reliability engineering; Materials science; Computer science; Structural engineering; Composite material","score_opus":0.020609327114675915,"score_gpt":0.269916161805235,"score_spread":0.24930683469055906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1866356858","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9926402,0.00011385091,0.006687039,0.000014477626,0.000005623704,0.000025750227,0.00005784057,0.00011657438,0.0003385112],"genre_scores_gemma":[0.9945268,0.000068078014,0.0048395824,0.0000047526046,0.0000019640556,0.000010420298,0.00014139508,0.00001790463,0.00038910692],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989825,0.00021841534,0.000043646214,0.00013272207,0.00055563386,0.00006702694],"domain_scores_gemma":[0.99771726,0.000473893,0.00055255217,0.0004551642,0.00066772476,0.00013343291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064075046,0.00043163274,0.0003131017,0.00068501197,0.0002595378,0.00034965188,0.00094104867,0.00035097823,0.0009616626],"category_scores_gemma":[0.002714234,0.00018320125,0.00023881321,0.00037058935,0.0002320359,0.0005225398,0.00027277312,0.00024155706,0.00025723025],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016983639,0.0012330923,0.028601952,0.00051878794,0.00013122875,0.0005421223,0.00068331824,0.03537096,0.74358964,0.00031768432,0.0006788229,0.18663405],"study_design_scores_gemma":[0.00024337257,0.03525635,0.1411782,0.00008342227,0.00036490275,0.0018256522,0.00079775514,0.09750771,0.7163653,0.000266076,0.0060157212,0.00009552841],"about_ca_topic_score_codex":0.0013397231,"about_ca_topic_score_gemma":0.0028420528,"teacher_disagreement_score":0.0013397231,"about_ca_system_score_codex":0.0005442189,"about_ca_system_score_gemma":0.0001717326,"threshold_uncertainty_score":0.003948629},"labels":[],"label_agreement":null},{"id":"W1874132801","doi":"10.1109/pes.2004.1373274","title":"Modeling and simulation of the electric part of a grid connected microturbine","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Advanced Aircraft Design and Technologies","field":"Environmental Science","cited_by":57,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Grid; Voltage; Software; Turbine; Three-phase; Computer science; Engineering; Electrical engineering; Control engineering; Mechanical engineering","score_opus":0.006368554679088664,"score_gpt":0.20055214019393094,"score_spread":0.19418358551484227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1874132801","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41279486,0.0006131358,0.5123702,0.0007603525,0.00017986905,0.00031652377,0.0016954041,0.0028163258,0.0684534],"genre_scores_gemma":[0.97160566,0.0003193376,0.013982422,0.000058005702,0.000013402383,0.0002277876,0.0004751258,0.00011695325,0.013201364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998884,0.000025910687,0.000005591899,0.000019790152,0.000039316335,0.00002094425],"domain_scores_gemma":[0.999863,0.000051196534,0.000016410293,0.00001494143,0.000039562143,0.000014777148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014880484,0.0005104571,0.0007043143,0.00027171697,0.00055948773,0.0008311016,0.0010638123,0.0011698529,0.005109873],"category_scores_gemma":[0.00047357276,0.00040285432,0.00056283193,0.00042453723,0.00046225093,0.00081989577,0.00037494267,0.0005700353,0.00066681893],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037982903,0.000016025848,0.0003121483,0.00002307632,0.000009892061,0.00006650135,0.000023263785,0.9951395,0.0014754119,0.0012583471,0.00019631676,0.0014415687],"study_design_scores_gemma":[0.000014826937,0.00001680617,0.00013529693,0.0000030076508,0.0000046713135,0.00001338256,0.000009125756,0.9980416,0.0006744459,0.0003912041,0.00069239066,0.0000031979441],"about_ca_topic_score_codex":0.019100951,"about_ca_topic_score_gemma":0.0076415734,"teacher_disagreement_score":0.019100951,"about_ca_system_score_codex":0.0008349013,"about_ca_system_score_gemma":0.0010832229,"threshold_uncertainty_score":0.037979543},"labels":[],"label_agreement":null},{"id":"W1892589332","doi":"10.1109/pes.2004.1373231","title":"Use of large capacity SMES to improve the power quality and stability of wind farms","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Electric power system; Turbine; Superconducting magnetic energy storage; Transient (computer programming); Automotive engineering; Environmental science; Control theory (sociology); Electrical engineering; Power (physics); Computer science; Engineering; Control (management); Mechanical engineering; Physics; Superconducting magnet","score_opus":0.01972668678064586,"score_gpt":0.23697613141846238,"score_spread":0.21724944463781654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1892589332","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71075815,0.0015062563,0.27445167,0.00035567925,0.000119205186,0.00005761924,0.0000814505,0.0021050079,0.010564963],"genre_scores_gemma":[0.99523395,0.0001291813,0.0041983887,0.000009882401,0.000018195768,0.0000054330585,0.000012392707,0.0000088061015,0.0003838573],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999505,0.00001514686,0.0000054908232,0.000006153748,0.000018304332,0.000004374794],"domain_scores_gemma":[0.9997876,0.000095580144,0.00004468018,0.000026180445,0.000032823045,0.000013126994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013710222,0.00022348305,0.00023364923,0.00018804918,0.00012478263,0.0002406977,0.00020560004,0.00020030413,0.00095801975],"category_scores_gemma":[0.00041259275,0.000094770825,0.000109057575,0.00020402177,0.00015601717,0.00032296567,0.00017521935,0.0001864786,0.00018503264],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006876513,0.00020910955,0.0022666776,0.00031455522,0.00006142171,0.0009567532,0.00011033264,0.14750105,0.67429376,0.005280217,0.0019215067,0.16639699],"study_design_scores_gemma":[0.00033745362,0.0022222484,0.009477769,0.00006673075,0.00012059178,0.0011353333,0.000081343656,0.68732506,0.28151295,0.007428662,0.01023356,0.00005829758],"about_ca_topic_score_codex":0.00010810377,"about_ca_topic_score_gemma":0.00030978452,"teacher_disagreement_score":0.00095801975,"about_ca_system_score_codex":0.00007786368,"about_ca_system_score_gemma":0.00005584124,"threshold_uncertainty_score":0.0032049417},"labels":[],"label_agreement":null},{"id":"W1894399504","doi":"10.1109/pes.2004.1372862","title":"Compensation of the voltage flicker using an efficient algorithm for series and parallel mitigating devices","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Flicker; Computer science; Voltage; Compensation (psychology); SIGNAL (programming language); Series (stratigraphy); Control theory (sociology); Algorithm; Voltage compensation; Electronic engineering; Artificial intelligence; Engineering; Electrical engineering; Control (management)","score_opus":0.018607186630278827,"score_gpt":0.2377012326089516,"score_spread":0.21909404597867277,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1894399504","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008615072,0.00007224684,0.9901917,0.000022060682,0.000030959778,0.000028492721,0.0000053203116,0.0004846422,0.0005494733],"genre_scores_gemma":[0.18429741,0.00011058316,0.81291324,0.000057942896,0.00005158101,0.00010487731,0.000044867855,0.00006181121,0.0023576715],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979407,0.000027150805,0.000017596152,0.00005715002,0.00008410056,0.000019867493],"domain_scores_gemma":[0.99971086,0.000106618565,0.000042098643,0.000044657412,0.00008411377,0.000011616721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004144532,0.0006875255,0.00050570426,0.00055120944,0.0003735144,0.00043692876,0.00066732086,0.0004823904,0.0018808014],"category_scores_gemma":[0.0010270968,0.00023816606,0.0002873572,0.00042998738,0.00029920615,0.0006437242,0.00030036626,0.0006498756,0.0005554868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021651549,0.00013830901,0.0006602121,0.00008688634,0.000048029804,0.000063053834,0.00006450573,0.06849626,0.081171766,0.004425418,0.00095084467,0.8436781],"study_design_scores_gemma":[0.000046409845,0.00019051149,0.0007823764,0.0000111179015,0.000030192494,0.00018475011,0.000017223421,0.9593345,0.03388286,0.0021043494,0.0033992208,0.000016504708],"about_ca_topic_score_codex":0.0011096457,"about_ca_topic_score_gemma":0.002319666,"teacher_disagreement_score":0.0018808014,"about_ca_system_score_codex":0.00028074204,"about_ca_system_score_gemma":0.0004962859,"threshold_uncertainty_score":0.0062918663},"labels":[],"label_agreement":null},{"id":"W1915520581","doi":"10.1109/pes.2004.1373022","title":"Frequency domain analysis of electromagnetic transients through the numerical Laplace transforms","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Laplace transform; Complement (music); Computer science; Frequency domain; Laplace transform applied to differential equations; Electronic engineering; Inverse Laplace transform; Time domain; Domain (mathematical analysis); Relevance (law); Algorithm; Engineering; Mathematics; Mathematical analysis","score_opus":0.0035896295130290086,"score_gpt":0.2036798976721392,"score_spread":0.20009026815911019,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1915520581","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021925461,0.00031545246,0.99355584,0.00006543833,0.000036204223,0.0000115135435,0.000012095043,0.00017200386,0.003638923],"genre_scores_gemma":[0.27904683,0.004218143,0.7063933,0.0001452599,0.00029091016,0.00012998545,0.00013681805,0.0002503452,0.009388291],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997377,0.000062142164,0.000013809823,0.000026154083,0.00014846874,0.000011710714],"domain_scores_gemma":[0.9995993,0.00023664672,0.00003288055,0.00003862908,0.00008263655,0.000010033329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005980933,0.00043017167,0.00033175998,0.0007436235,0.00027112465,0.00095607305,0.00039477917,0.00045233849,0.0020283647],"category_scores_gemma":[0.0023656308,0.00017537529,0.00037475026,0.00056467013,0.00063006807,0.0015520044,0.0005378264,0.000873838,0.0008480428],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006179945,0.000059994927,0.00087638234,0.00033026523,0.00003721275,0.00027863658,0.00040399737,0.30944157,0.04606113,0.38980153,0.0023834652,0.250264],"study_design_scores_gemma":[0.000009462617,0.000040661136,0.0001918246,0.00004128114,0.000008777075,0.00024737712,0.00005219216,0.8988617,0.0061385455,0.07950854,0.014882777,0.000016792743],"about_ca_topic_score_codex":0.00049474894,"about_ca_topic_score_gemma":0.00036043176,"teacher_disagreement_score":0.0020283647,"about_ca_system_score_codex":0.00024556796,"about_ca_system_score_gemma":0.00045774374,"threshold_uncertainty_score":0.0067855716},"labels":[],"label_agreement":null},{"id":"W1919443814","doi":"10.1109/pes.2004.1373277","title":"Deterministic/probabilistic contingency evaluation in composite generation and transmission systems","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Probabilistic logic; Computer science; Transmission system; Electric power system; Business system planning; Component (thermodynamics); Contingency; Transmission (telecommunications); Point (geometry); Mathematical optimization; Power (physics); Engineering; Artificial intelligence; Mathematics; Systems engineering","score_opus":0.010499859089040454,"score_gpt":0.2168362416346241,"score_spread":0.20633638254558365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1919443814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25828332,0.00079449307,0.73254055,0.00020522789,0.00003598862,0.00007611674,0.0001457909,0.00022988248,0.0076886327],"genre_scores_gemma":[0.9648273,0.00021227745,0.034206167,0.000012804398,0.000021121072,0.000031328607,0.00006421289,0.000021596514,0.00060316134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839467,0.0007815713,0.0000534865,0.00009556757,0.0005710506,0.000103631915],"domain_scores_gemma":[0.99633837,0.0027623787,0.00033453276,0.00012006836,0.00035561583,0.00008906722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026366562,0.00053259084,0.0005000219,0.0013623221,0.00032793146,0.00096401514,0.0003664987,0.00037272138,0.0011015586],"category_scores_gemma":[0.0069521293,0.00037640007,0.00043472977,0.0009820112,0.00072370935,0.000950917,0.0005244781,0.00041202322,0.00008155011],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000844748,0.000015159009,0.0018932172,0.000029768196,0.00003090922,0.00012582232,0.000019453973,0.97035855,0.00061927724,0.012052047,0.00023360192,0.014537758],"study_design_scores_gemma":[0.000004593384,0.000035605324,0.0011344794,0.0000039521765,0.000010482722,0.00004323882,0.000011781254,0.9902914,0.0002897995,0.008008968,0.0001586815,0.000006918699],"about_ca_topic_score_codex":0.0026318391,"about_ca_topic_score_gemma":0.0037562912,"teacher_disagreement_score":0.0026366562,"about_ca_system_score_codex":0.000734673,"about_ca_system_score_gemma":0.00061591435,"threshold_uncertainty_score":0.013944149},"labels":[],"label_agreement":null},{"id":"W1927800034","doi":"10.1109/pes.2004.1372739","title":"Power system infrastructure security and defense","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Terrorism; Reliability (semiconductor); Electric power system; Power (physics); National security; Telecommunications; Computer security; Engineering; Forensic engineering; Computer science; Political science; Law","score_opus":0.0021677330528122995,"score_gpt":0.17242821115547508,"score_spread":0.1702604781026628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1927800034","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070762667,0.026332736,0.011608436,0.06962961,0.0024229533,0.000052917218,0.000208138,0.00018795599,0.882481],"genre_scores_gemma":[0.54898953,0.05486244,0.005186948,0.01017042,0.003314969,0.000110551395,0.00041278396,0.000079371,0.376873],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957055,0.00012041355,0.000016968104,0.000060921666,0.00017274915,0.00005846712],"domain_scores_gemma":[0.9995407,0.00009955828,0.000048844802,0.00007469468,0.0001693907,0.000066848814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073874876,0.0003593423,0.00020060994,0.00052548514,0.0013320042,0.0032736605,0.00021659299,0.0012917597,0.022260537],"category_scores_gemma":[0.0017199151,0.00011046551,0.00012249901,0.0007428076,0.0014247714,0.0018369735,0.0014607796,0.0016273567,0.003786855],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024933453,0.000024946177,0.0010586192,0.00012534083,0.000020607928,0.0001332283,0.00046777414,0.0015743326,0.00057080685,0.5626649,0.20834392,0.22499056],"study_design_scores_gemma":[0.0000061615833,0.000044582506,0.0014956987,0.0002411602,0.0000076288256,0.00023346556,0.00038404658,0.0010849979,0.00025871035,0.15189281,0.8443429,0.000007842496],"about_ca_topic_score_codex":0.0023761494,"about_ca_topic_score_gemma":0.0033886705,"teacher_disagreement_score":0.022260537,"about_ca_system_score_codex":0.0013404378,"about_ca_system_score_gemma":0.0019204007,"threshold_uncertainty_score":0.07446897},"labels":[],"label_agreement":null},{"id":"W1938281091","doi":"10.1109/pes.2004.1373081","title":"Synchronous generator model identification using Volterra series","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Control Systems and Identification","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Volterra series; Generator (circuit theory); Control theory (sociology); Convolution (computer science); Generalization; Nonlinear system; Computer science; Permanent magnet synchronous generator; Voltage; Series (stratigraphy); Volterra integral equation; Applied mathematics; Power (physics); Mathematics; Integral equation; Engineering; Mathematical analysis; Artificial intelligence; Physics","score_opus":0.007923703237206385,"score_gpt":0.20420102228952505,"score_spread":0.19627731905231866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1938281091","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019924676,0.0001624852,0.97606725,0.000043466895,0.000032576005,0.000031169857,0.000050363942,0.0005422905,0.0031458093],"genre_scores_gemma":[0.87972534,0.0004852444,0.11358799,0.00003036123,0.000031417203,0.00012782909,0.00019800387,0.00008807258,0.005725658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998159,0.000057704197,0.000010004446,0.000038243623,0.000067078814,0.000011123979],"domain_scores_gemma":[0.9998467,0.000058580175,0.000022672828,0.000029925135,0.00003764993,0.0000044356257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003504441,0.00053093367,0.00050680304,0.0004241683,0.00024351085,0.00048783643,0.0005024684,0.00052099826,0.0013168294],"category_scores_gemma":[0.0007593818,0.00017718892,0.0004928546,0.00040992818,0.00020112112,0.00063189474,0.00024201976,0.00046334014,0.0006298624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004606034,0.000028868555,0.00042522646,0.00008749591,0.000034421228,0.00013522663,0.000059133858,0.9099734,0.0142061,0.012383357,0.00046498564,0.062155638],"study_design_scores_gemma":[0.0000015828193,0.000012068212,0.000084596344,0.0000024019773,0.0000031536354,0.000027015418,0.000003287939,0.99620146,0.001697324,0.0014032875,0.000560753,0.0000031101777],"about_ca_topic_score_codex":0.0016752636,"about_ca_topic_score_gemma":0.0013375386,"teacher_disagreement_score":0.0016752636,"about_ca_system_score_codex":0.00027804103,"about_ca_system_score_gemma":0.00033066745,"threshold_uncertainty_score":0.0044052005},"labels":[],"label_agreement":null},{"id":"W1946797405","doi":"10.1109/pes.2004.1372740","title":"Considerations of relevant factors in setting distribution system reliability standards","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Reliability (semiconductor); Metric (unit); Reliability engineering; Duration (music); Index (typography); Computer science; Operations research; Engineering; Operations management","score_opus":0.0044532881495786,"score_gpt":0.20301819505124782,"score_spread":0.19856490690166922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1946797405","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17442521,0.012748346,0.3955234,0.13311121,0.0054805228,0.0032525915,0.0008660393,0.0010659253,0.27352685],"genre_scores_gemma":[0.7622909,0.003127758,0.21603188,0.0066392445,0.00086502224,0.0010073141,0.00032486723,0.0002933076,0.009419715],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.8605478,0.053731695,0.019817377,0.0047414266,0.057124708,0.0040369728],"domain_scores_gemma":[0.6851935,0.13236666,0.016191142,0.010521263,0.15167391,0.0040535587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.12909985,0.0009269455,0.0011617806,0.004650625,0.005370245,0.010468937,0.003733293,0.003609052,0.002099755],"category_scores_gemma":[0.28409672,0.0010477458,0.0006525574,0.00566004,0.0049538254,0.0078121703,0.0035109194,0.007301378,0.0007361475],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018193213,0.00034398414,0.032996602,0.0015367728,0.00008949254,0.0011689891,0.016402887,0.024497334,0.0041975086,0.593218,0.053775307,0.27159122],"study_design_scores_gemma":[0.00021024152,0.0011591162,0.07531985,0.009609911,0.00028615375,0.0022972662,0.0574469,0.039275646,0.018847937,0.35731086,0.4370844,0.0011517555],"about_ca_topic_score_codex":0.050541703,"about_ca_topic_score_gemma":0.059592042,"teacher_disagreement_score":0.12909985,"about_ca_system_score_codex":0.01378731,"about_ca_system_score_gemma":0.0316022,"threshold_uncertainty_score":0.68275344},"labels":[],"label_agreement":null},{"id":"W1947586887","doi":"10.1109/pes.2004.1373142","title":"Under voltage load shedding for voltage stability overview of concepts and principles","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Capital Power (Canada)","funders":"","keywords":"Load Shedding; Voltage; Work (physics); Reliability engineering; Electric power system; Voltage regulation; Computer science; Measure (data warehouse); Electrical engineering; Power (physics); Engineering; Control engineering; Mechanical engineering; Physics","score_opus":0.026526807521178572,"score_gpt":0.2640322447566436,"score_spread":0.23750543723546502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1947586887","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0054829945,0.084206305,0.7957241,0.0023636576,0.0014430557,0.0002430711,0.0001851086,0.00067055225,0.10968121],"genre_scores_gemma":[0.36287037,0.16673224,0.40356493,0.0027055088,0.005370074,0.0010381606,0.0004117547,0.0003498418,0.056957066],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99965036,0.00006907042,0.000019900097,0.00006241896,0.00017642527,0.00002182963],"domain_scores_gemma":[0.9998105,0.0000680311,0.000024457959,0.00002752115,0.000057145622,0.000012413534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038165902,0.0007788831,0.000527839,0.0009017345,0.0006045863,0.0014358822,0.0008009429,0.0009963575,0.005422004],"category_scores_gemma":[0.00041505258,0.00040856254,0.00043910393,0.0010125036,0.0010438164,0.0016039488,0.0007115805,0.00217218,0.001866718],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053825705,0.00012539246,0.0002683284,0.0011474388,0.000027642434,0.00026241096,0.0003349815,0.01970336,0.023192711,0.6373226,0.018670393,0.298891],"study_design_scores_gemma":[0.000028070928,0.00033069897,0.0007337098,0.00071705115,0.000029889954,0.0012260451,0.00013051013,0.060015835,0.0074785347,0.4206109,0.50861996,0.000078770274],"about_ca_topic_score_codex":0.00032957786,"about_ca_topic_score_gemma":0.00041929644,"teacher_disagreement_score":0.005422004,"about_ca_system_score_codex":0.0005132723,"about_ca_system_score_gemma":0.0004646137,"threshold_uncertainty_score":0.018138409},"labels":[],"label_agreement":null},{"id":"W1960669369","doi":"10.1109/pes.2004.1372772","title":"Integrating security constraints in optimal power flow studies","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Power flow; Computer science; Power (physics); Transient (computer programming); Electric power system; Flow (mathematics); Power-flow study; Stability (learning theory); State (computer science); Steady state (chemistry); Reliability engineering; Engineering; Mathematics; Operating system; Algorithm","score_opus":0.008383108265596479,"score_gpt":0.23177678818144432,"score_spread":0.22339367991584783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1960669369","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014517052,0.00017159038,0.98148555,0.00013116127,0.000021525651,0.000031574586,0.00002531197,0.000045400804,0.0035709154],"genre_scores_gemma":[0.7113817,0.00065494835,0.28574142,0.000066501896,0.00007149638,0.00021827292,0.00008629581,0.00012370809,0.0016557097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989988,0.000545526,0.00005436675,0.00007441691,0.0002636382,0.000063157175],"domain_scores_gemma":[0.99785596,0.0016425813,0.00016218236,0.000095371375,0.00020413489,0.0000397531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022389328,0.00096792245,0.00097219466,0.0010110938,0.00046309837,0.0013549435,0.00064530043,0.0007672065,0.0021521726],"category_scores_gemma":[0.0070723053,0.0008152836,0.00055509043,0.00083113887,0.000976844,0.0031226182,0.0009921498,0.0011912351,0.00018364619],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032343967,0.000023624794,0.00026281032,0.000045749013,0.000016052216,0.00005928781,0.000048527658,0.91767764,0.00091534073,0.06210519,0.0003070812,0.018506374],"study_design_scores_gemma":[0.000013673903,0.000023316503,0.00008425481,0.000019363919,0.0000050360213,0.000014890433,0.000015115522,0.9531975,0.0005980778,0.045315586,0.0007027548,0.000010437417],"about_ca_topic_score_codex":0.0023314406,"about_ca_topic_score_gemma":0.0018884194,"teacher_disagreement_score":0.0023314406,"about_ca_system_score_codex":0.00061605993,"about_ca_system_score_gemma":0.0010834003,"threshold_uncertainty_score":0.011840761},"labels":[],"label_agreement":null},{"id":"W1971096171","doi":"10.1109/pes.2004.1373143","title":"On composite load modeling for voltage stability and under voltage load shedding","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Jacobs (Canada)","funders":"","keywords":"Load Shedding; Voltage; Computer science; Dynamic load testing; Control theory (sociology); Voltage regulation; Aggregate (composite); Stability (learning theory); Reliability engineering; Electric power system; Engineering; Control (management); Power (physics); Structural engineering; Electrical engineering","score_opus":0.011614010585153985,"score_gpt":0.22075163982918727,"score_spread":0.20913762924403329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971096171","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004037496,0.0004909668,0.98502225,0.0002851406,0.00007985118,0.000023581846,0.00009013564,0.00019360152,0.009776908],"genre_scores_gemma":[0.68674654,0.004646905,0.2744715,0.0003993657,0.00067458715,0.00034541232,0.00074519345,0.000595398,0.03137523],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949086,0.00020936692,0.000023046563,0.00007537,0.00016704082,0.000034307035],"domain_scores_gemma":[0.99933076,0.00034810344,0.00007858834,0.00008742098,0.00013572295,0.000019446836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010924393,0.0010413835,0.00079128717,0.0006717866,0.000490569,0.00117752,0.0012005165,0.0011549526,0.0033500972],"category_scores_gemma":[0.0020588886,0.0004228766,0.0012147919,0.0011228283,0.0006507396,0.0018583694,0.0008704105,0.001581765,0.0010268644],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024604436,0.00003102093,0.000271623,0.00005416346,0.000017192137,0.0000678739,0.00009080886,0.8424873,0.001199816,0.13348271,0.0018579181,0.020414991],"study_design_scores_gemma":[0.0000014085148,0.000008759621,0.0000407756,0.0000060827388,0.0000029690452,0.000010379732,0.0000043256746,0.9776292,0.00011978686,0.020388478,0.0017839519,0.00000383353],"about_ca_topic_score_codex":0.0051376857,"about_ca_topic_score_gemma":0.004417135,"teacher_disagreement_score":0.0051376857,"about_ca_system_score_codex":0.0008586085,"about_ca_system_score_gemma":0.00074940716,"threshold_uncertainty_score":0.011207223},"labels":[],"label_agreement":null},{"id":"W2001678765","doi":"10.1109/pes.2004.1373295","title":"Sustainable electric power systems in the 21st century: requirements, challenges and the role of new technologies","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"","keywords":"Prosperity; Monopolistic competition; Sustainability; Restructuring; Electricity; Business; Electric power industry; Sustainable development; Environmental economics; Industrial organization; Natural resource economics; Economic system; Engineering; Economics; Market economy; Economic growth; Finance; Electrical engineering","score_opus":0.006973726586038293,"score_gpt":0.1974990673119289,"score_spread":0.1905253407258906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001678765","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039551686,0.42660314,0.08028518,0.2133556,0.0034289702,0.00004756052,0.00011974594,0.00021935896,0.2363888],"genre_scores_gemma":[0.48948163,0.4103419,0.029802473,0.0076873484,0.0056009945,0.0001009757,0.0001549181,0.00012624502,0.056703582],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9989272,0.00031768062,0.0000347052,0.0000644797,0.0005930755,0.000062947845],"domain_scores_gemma":[0.99909353,0.0004130702,0.00006630347,0.000044959455,0.00029493612,0.00008719385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016876712,0.00041003313,0.0003626884,0.0004180753,0.00088269165,0.004114886,0.00058816944,0.0020194866,0.0028422542],"category_scores_gemma":[0.001950306,0.00019724443,0.00018103104,0.0010475887,0.0029588481,0.0058797696,0.0012814752,0.0020610597,0.0007436253],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004505828,0.000058716043,0.0012653555,0.00082202215,0.000019854564,0.00023026209,0.00074605807,0.015224131,0.001795577,0.6419251,0.043033395,0.2948345],"study_design_scores_gemma":[0.000010273478,0.00007861209,0.0011888599,0.00059564866,0.000010228246,0.000340579,0.0018143082,0.011498169,0.0006186097,0.5429268,0.4408795,0.00003846616],"about_ca_topic_score_codex":0.0012739198,"about_ca_topic_score_gemma":0.0033072112,"teacher_disagreement_score":0.004114886,"about_ca_system_score_codex":0.0015254602,"about_ca_system_score_gemma":0.0016353404,"threshold_uncertainty_score":0.011068046},"labels":[],"label_agreement":null},{"id":"W2076136622","doi":"10.1109/pes.2004.1373160","title":"Data management issues associated with the August 14, 2003 blackout investigation","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Pacific Northwest National Laboratory; Natural Environment Research Council","keywords":"Blackout; Electricity; Work (physics); Engineering; Interim; Task (project management); Scope (computer science); Task force; Aeronautics; Electric power industry; Electric power; Operations research; Operations management; Computer security; Computer science; Electric power system; Power (physics); Systems engineering; Political science; Electrical engineering; Public administration","score_opus":0.011615438946576644,"score_gpt":0.20838106419261895,"score_spread":0.1967656252460423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076136622","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21579956,0.0050982703,0.24249752,0.31635603,0.0203849,0.011475852,0.021866253,0.04309936,0.123422295],"genre_scores_gemma":[0.6407886,0.0033106343,0.22173072,0.04869578,0.006890581,0.0062789973,0.022047598,0.0069200834,0.04333692],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.8880024,0.0389659,0.019706396,0.0082231965,0.042132877,0.002969169],"domain_scores_gemma":[0.59401333,0.15764911,0.05839051,0.08474676,0.09513813,0.010062103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.09705834,0.0007519037,0.0009927824,0.006835162,0.0069866776,0.01199979,0.0044040773,0.0042581256,0.0036879703],"category_scores_gemma":[0.24132718,0.0015880088,0.00072756177,0.007851412,0.0034563832,0.008933572,0.0057616914,0.007098942,0.0044165244],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013109162,0.0008306369,0.048589997,0.0012123242,0.00014658808,0.005085037,0.021786662,0.004926315,0.008195172,0.028202606,0.49679798,0.38291577],"study_design_scores_gemma":[0.00019145904,0.0002934777,0.027011361,0.0013484186,0.00009989096,0.0019194491,0.0169022,0.0123136025,0.0106512,0.019365298,0.9095628,0.00034071424],"about_ca_topic_score_codex":0.0138210645,"about_ca_topic_score_gemma":0.012128571,"teacher_disagreement_score":0.09705834,"about_ca_system_score_codex":0.010007984,"about_ca_system_score_gemma":0.012095616,"threshold_uncertainty_score":0.5132997},"labels":[],"label_agreement":null},{"id":"W2106040177","doi":"10.1109/pes.2004.1373187","title":"Development of a DC current-blocking device for transformer neutrals","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Electrical engineering; Blocking (statistics); Transformer; Capacitor; Ground; Current transformer; Electric power system; Voltage; Engineering; Computer science; Power (physics); Computer network; Physics","score_opus":0.015260981742108222,"score_gpt":0.24514628129342586,"score_spread":0.22988529955131765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106040177","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4825779,0.01898099,0.2717622,0.002247304,0.00427227,0.002316189,0.0030019628,0.0046718586,0.21016945],"genre_scores_gemma":[0.7507332,0.006448888,0.084758244,0.0003965689,0.00019202425,0.00026155572,0.0029375367,0.0003051001,0.1539668],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99977404,0.000007915166,0.000010199725,0.000034728822,0.00014855927,0.000024520192],"domain_scores_gemma":[0.9996074,0.000020043859,0.000024827623,0.000025217712,0.00028664598,0.000035943875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025124068,0.00032798742,0.000250265,0.00040677452,0.00037915318,0.00046440758,0.0006623148,0.00032133606,0.008100348],"category_scores_gemma":[0.00034001126,0.00013458291,0.00012521663,0.00027523265,0.00018250803,0.00040934441,0.00017611109,0.00034516945,0.002369883],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016911956,0.000093117706,0.0010681665,0.00072485744,0.000018167335,0.00027978304,0.00014696096,0.0010730608,0.85272974,0.004485804,0.01737558,0.12183557],"study_design_scores_gemma":[0.000058567923,0.00091713504,0.0038977682,0.000052213243,0.000050347244,0.000937068,0.0000666226,0.005482118,0.6988238,0.00018007462,0.28950477,0.000029575696],"about_ca_topic_score_codex":0.007053689,"about_ca_topic_score_gemma":0.01016352,"teacher_disagreement_score":0.008100348,"about_ca_system_score_codex":0.0010414748,"about_ca_system_score_gemma":0.00077700865,"threshold_uncertainty_score":0.027098417},"labels":[],"label_agreement":null},{"id":"W2109665095","doi":"10.1109/pes.2004.1372938","title":"An investigation on the reactive power support service needs of power producers","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"AC power; Generator (circuit theory); Computer science; Power (physics); Electric power system; Compensation (psychology); Service (business); Profit (economics); Electrical engineering; Reliability engineering; Engineering; Business; Voltage; Economics; Marketing; Microeconomics","score_opus":0.010884025242997622,"score_gpt":0.21034779605905246,"score_spread":0.19946377081605485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109665095","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9841092,0.00009032474,0.005780734,0.00076155603,0.000006426107,0.000024467668,0.0000777934,0.000014509588,0.009134987],"genre_scores_gemma":[0.99792284,0.00007143697,0.0009631536,0.000029857814,0.000010265191,0.000008847628,0.000053785647,0.000005469163,0.0009344504],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993407,0.00024995106,0.00002918215,0.00008674235,0.00022627611,0.00006720634],"domain_scores_gemma":[0.99430484,0.004014334,0.00046067956,0.0001473159,0.0009019856,0.00017078826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082973985,0.00015139997,0.0002111416,0.00032222108,0.0003483923,0.0006517106,0.0003359517,0.00063795113,0.0024012555],"category_scores_gemma":[0.008284034,0.000143877,0.000102552236,0.0005128361,0.00030538504,0.0020001545,0.0002771539,0.00038436812,0.00032307743],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044654687,0.0011093155,0.43085468,0.0013817919,0.00010255427,0.006593166,0.023766255,0.05444726,0.15458262,0.033799935,0.00582179,0.28307518],"study_design_scores_gemma":[0.00020123053,0.003252989,0.5504586,0.00011099352,0.00016460587,0.005150197,0.04490493,0.27420905,0.05325942,0.032483995,0.03566935,0.00013463764],"about_ca_topic_score_codex":0.0011490624,"about_ca_topic_score_gemma":0.001420913,"teacher_disagreement_score":0.0024012555,"about_ca_system_score_codex":0.0003809119,"about_ca_system_score_gemma":0.00026194195,"threshold_uncertainty_score":0.008033037},"labels":[],"label_agreement":null},{"id":"W2112894805","doi":"10.1109/pes.2004.1373040","title":"An innovative industry-university partnership to enhance university training and industry recruiting in power engineering","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Experimental Learning in Engineering","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université de Sherbrooke; McGill University","funders":"","keywords":"Internship; General partnership; Engineering management; Incentive; Engineering education; Training (meteorology); Power (physics); Engineering; Business; Finance; Economics; Economic growth","score_opus":0.012078001175478987,"score_gpt":0.24213297991238728,"score_spread":0.23005497873690828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112894805","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07584044,0.005388205,0.06224854,0.07329251,0.014707848,0.0043888255,0.0008578709,0.0023480905,0.7609277],"genre_scores_gemma":[0.154151,0.0018473985,0.02633445,0.005781418,0.002341365,0.001202507,0.00080685515,0.00034196387,0.8071931],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99806374,0.00078385463,0.00006237544,0.00016314186,0.00052706525,0.0003998644],"domain_scores_gemma":[0.993364,0.0006775319,0.00015562515,0.0002649804,0.00065757753,0.004880356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034626778,0.00029635776,0.00021694953,0.00046745365,0.0013083067,0.0018630737,0.0008127208,0.0015984457,0.1966975],"category_scores_gemma":[0.0026675747,0.00017690042,0.0001828456,0.00057582825,0.0004008439,0.0013429577,0.003195334,0.0010746957,0.046625815],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015515252,0.0013953423,0.0013476806,0.0002363083,0.0000051922793,0.000201077,0.0003631283,0.00029433484,0.0030811157,0.0059472695,0.40344533,0.58352804],"study_design_scores_gemma":[0.00015540852,0.0010789608,0.0079914,0.00010659843,0.000007970871,0.00067981746,0.0006571045,0.0011804983,0.0012910356,0.0022550623,0.98457795,0.000018098131],"about_ca_topic_score_codex":0.00023029582,"about_ca_topic_score_gemma":0.001492104,"teacher_disagreement_score":0.1966975,"about_ca_system_score_codex":0.0004911897,"about_ca_system_score_gemma":0.0029251238,"threshold_uncertainty_score":0.6580187},"labels":[],"label_agreement":null},{"id":"W2118084297","doi":"10.1109/pes.2004.1372959","title":"A \"critical impedance\" based method for identifying harmonic sources","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Harmonic; Harmonic analysis; Electrical impedance; Computer science; Field (mathematics); Point (geometry); Electronic engineering; Power (physics); Engineering; Electrical engineering; Acoustics; Mathematics; Physics","score_opus":0.025574211810640627,"score_gpt":0.29956882669699764,"score_spread":0.273994614886357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118084297","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022726061,0.0014540793,0.9772974,0.00023867535,0.0013451346,0.000138235,0.00022178268,0.0016397012,0.01539224],"genre_scores_gemma":[0.1517402,0.0025890123,0.77067083,0.00064026716,0.0013263291,0.0004456792,0.0009420701,0.00051301956,0.07113267],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999602,0.00006312706,0.000018310397,0.00009057992,0.00020874898,0.000017139555],"domain_scores_gemma":[0.99952114,0.00013157954,0.00004436976,0.0000664749,0.00021463213,0.00002186285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000295692,0.0006151534,0.0005113737,0.0011066061,0.0003975798,0.0007725268,0.0008565468,0.000681225,0.04101706],"category_scores_gemma":[0.0015033645,0.0002110458,0.00019953193,0.00083464594,0.00043986787,0.00072322256,0.00045358675,0.0006573137,0.015048925],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018947311,0.000035506546,0.00045097835,0.0005794707,0.000038096852,0.00020057728,0.00006982475,0.006720747,0.10202218,0.025341513,0.053561877,0.8107899],"study_design_scores_gemma":[0.00009695388,0.00048414132,0.002569887,0.00030433343,0.00014620193,0.0034021942,0.000119427285,0.33323216,0.117614955,0.023668274,0.5181537,0.00020777225],"about_ca_topic_score_codex":0.00059762463,"about_ca_topic_score_gemma":0.00097252347,"teacher_disagreement_score":0.04101706,"about_ca_system_score_codex":0.00037403285,"about_ca_system_score_gemma":0.00025942177,"threshold_uncertainty_score":0.13721573},"labels":[],"label_agreement":null},{"id":"W2119471982","doi":"10.1109/pes.2004.1373027","title":"Coordinated spot market for congestion management of inter-regional electricity markets","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; University of Waterloo","funders":"","keywords":"Congestion management; Electricity market; Electricity; Spot market; Forward contract; Spot contract; Industrial organization; Power market; Point (geometry); Electric power system; Electricity system; Computer science; Business; Electricity generation; Power (physics); Engineering; Finance; Electrical engineering","score_opus":0.00604614523891169,"score_gpt":0.20349858922293274,"score_spread":0.19745244398402104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2119471982","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06881669,0.00040252504,0.91934717,0.0003642738,0.00012029694,0.00008307826,0.0000930601,0.00031195095,0.010461043],"genre_scores_gemma":[0.9675702,0.00022286933,0.026260389,0.00003167251,0.00007955985,0.00007678674,0.00006742421,0.000040339084,0.005650795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995808,0.00019175197,0.000011726689,0.00007032988,0.000091590744,0.000053864787],"domain_scores_gemma":[0.9995623,0.000193065,0.000053490512,0.000037390324,0.00010422786,0.00004942777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000897942,0.00040808882,0.0009951404,0.00027329114,0.00032322164,0.0008603499,0.0006856171,0.0004917976,0.008344834],"category_scores_gemma":[0.0012413225,0.00018256894,0.0003609966,0.0003502457,0.0005187846,0.0010988556,0.00059653656,0.0005164913,0.00029601017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001865553,0.000057801448,0.0003224389,0.00008421482,0.000051120198,0.00012873279,0.000046594592,0.86887115,0.0029737526,0.080840796,0.0045929775,0.04184386],"study_design_scores_gemma":[0.000030347592,0.00005457188,0.00010190694,0.000002061612,0.000012159852,0.000014300887,0.000008977097,0.9868499,0.00034478487,0.011580003,0.0009970266,0.0000039732695],"about_ca_topic_score_codex":0.0017694202,"about_ca_topic_score_gemma":0.0020453942,"teacher_disagreement_score":0.008344834,"about_ca_system_score_codex":0.000608909,"about_ca_system_score_gemma":0.0008480319,"threshold_uncertainty_score":0.027916253},"labels":[],"label_agreement":null},{"id":"W2123723570","doi":"10.1109/pes.2004.1373020","title":"Entirely harmonic domain calculation of multiphase nonsinusoidal steady state","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Electromagnetic Simulation and Numerical Methods","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"University of Toronto","keywords":"Jacobian matrix and determinant; Harmonic; Nonlinear system; Frequency domain; Control theory (sociology); Initialization; Steady state (chemistry); Computer science; Harmonic analysis; Harmonic balance; Transient (computer programming); Topology (electrical circuits); Mathematics; Applied mathematics; Mathematical analysis; Physics","score_opus":0.008076526587076296,"score_gpt":0.24133786766689794,"score_spread":0.23326134107982163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2123723570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008103653,0.00007149314,0.9827235,0.000050238086,0.000058174362,0.000041528423,0.00005763199,0.0005398153,0.008353948],"genre_scores_gemma":[0.36997506,0.0003178099,0.6073824,0.00005853842,0.000057467754,0.0002593499,0.00040697397,0.00047529212,0.02106708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99993885,0.000014328193,0.0000027708502,0.0000066925177,0.000033199867,0.0000041018516],"domain_scores_gemma":[0.9997814,0.0000887846,0.000014379553,0.00003248112,0.000074698924,0.000008196364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000270731,0.00033402533,0.000371426,0.00030407013,0.00030986132,0.00043149304,0.0004498029,0.0003531185,0.011515312],"category_scores_gemma":[0.0007858853,0.00018460723,0.0002030706,0.00028237092,0.00020156226,0.00044689197,0.00033119306,0.00034646393,0.0017123112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049540937,0.00002800855,0.0004498517,0.00023383269,0.000022032142,0.00015532307,0.00010845066,0.74438745,0.0118788155,0.07410311,0.0053466423,0.16323692],"study_design_scores_gemma":[0.0000040067675,0.0000102477225,0.00005682507,0.0000068328836,0.0000021492872,0.000019880967,0.000008729546,0.9901996,0.0023498684,0.0035571384,0.0037816025,0.0000030316255],"about_ca_topic_score_codex":0.0007431662,"about_ca_topic_score_gemma":0.0011262837,"teacher_disagreement_score":0.011515312,"about_ca_system_score_codex":0.0002924064,"about_ca_system_score_gemma":0.00039764217,"threshold_uncertainty_score":0.0385226},"labels":[],"label_agreement":null},{"id":"W2127603156","doi":"10.1109/pes.2004.1372856","title":"A sequential phase energization technique for transformer inrush current reduction part II: theoretical analysis and design guide","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Magnetic Properties and Applications","field":"Materials Science","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Inrush current; Transformer; Resistor; Circuit breaker; Voltage; Computer science; Control theory (sociology); Limiting; Current limiting; Electrical engineering; Electronic engineering; Topology (electrical circuits); Engineering; Mechanical engineering","score_opus":0.013363182686307639,"score_gpt":0.26863320532398766,"score_spread":0.25527002263768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127603156","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013791623,0.0014695389,0.981323,0.0002161276,0.00011658854,0.00014325163,0.00004572972,0.0003584641,0.014948183],"genre_scores_gemma":[0.18285304,0.008229077,0.7593076,0.00048307277,0.00029156543,0.0009962512,0.00031303728,0.00036107126,0.04716523],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973315,0.000042409745,0.000018753459,0.00004598787,0.00014364898,0.000016139413],"domain_scores_gemma":[0.99987924,0.0000406046,0.000015376048,0.000024548464,0.000035525427,0.0000046364853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028230928,0.00077342545,0.00048625792,0.00088633806,0.00040820712,0.00079214835,0.0009467288,0.00085303636,0.008531245],"category_scores_gemma":[0.0004215759,0.0005106401,0.0004929916,0.0007050131,0.00087347464,0.001365234,0.00038343287,0.0011099561,0.0035288134],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010414445,0.00011187314,0.00021666221,0.0008728103,0.00003170963,0.00033072665,0.00041575843,0.04320521,0.123742945,0.48352486,0.01717946,0.33026385],"study_design_scores_gemma":[0.000050632436,0.00090401934,0.0005528445,0.0002566873,0.00005117542,0.0023685298,0.00015258267,0.39318058,0.06413638,0.1343426,0.4039058,0.00009819549],"about_ca_topic_score_codex":0.00044756898,"about_ca_topic_score_gemma":0.00046662206,"teacher_disagreement_score":0.008531245,"about_ca_system_score_codex":0.0005578083,"about_ca_system_score_gemma":0.0004370108,"threshold_uncertainty_score":0.028539836},"labels":[],"label_agreement":null},{"id":"W2135710804","doi":"10.1109/pes.2004.1373019","title":"Optimization-enabled electromagnetic transient simulation","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Research Manitoba; University of Manitoba","funders":"","keywords":"Emtp; Transient (computer programming); Computer science; Converters; Range (aeronautics); Power (physics); Electric power system; Control theory (sociology); Mathematical optimization; Engineering; Control (management); Mathematics","score_opus":0.004118073974526073,"score_gpt":0.19466066357206688,"score_spread":0.1905425895975408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135710804","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067450553,0.0004851974,0.9241824,0.00039136238,0.00020498503,0.00008423518,0.00034813688,0.0048538144,0.06270481],"genre_scores_gemma":[0.56393486,0.0018476052,0.37986615,0.00027770986,0.00019745958,0.00057337375,0.0012642764,0.0015347211,0.050503857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997911,0.0000728465,0.000010458865,0.000022439917,0.00008725597,0.000015961223],"domain_scores_gemma":[0.9997259,0.00012604952,0.000020002219,0.000042623484,0.000068296606,0.000017092105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002964872,0.00041245963,0.00047093842,0.00024517538,0.00021851253,0.0006404729,0.00043558032,0.0003977883,0.01839143],"category_scores_gemma":[0.00083187054,0.0001730763,0.00022530032,0.0003518434,0.00023199501,0.00041276368,0.00048623708,0.00060421135,0.0043341247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002018737,0.00004944883,0.00045383262,0.00030126606,0.00003288164,0.00013747842,0.00004425126,0.77648735,0.013962914,0.037173964,0.022123897,0.14903079],"study_design_scores_gemma":[0.00002358938,0.000042630076,0.00015936009,0.000024896372,0.000009193368,0.000044693625,0.000005692364,0.94420636,0.0056861844,0.005409863,0.044376407,0.000011128157],"about_ca_topic_score_codex":0.0007685269,"about_ca_topic_score_gemma":0.0009034274,"teacher_disagreement_score":0.01839143,"about_ca_system_score_codex":0.00034698917,"about_ca_system_score_gemma":0.0003679605,"threshold_uncertainty_score":0.061525464},"labels":[],"label_agreement":null},{"id":"W2137117184","doi":"10.1109/pes.2004.1372884","title":"Unified approach for mitigating voltage sag and voltage flicker using the DSTATCOM","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Flicker; Voltage sag; Kalman filter; Control theory (sociology); Voltage; Computer science; Compensation (psychology); Electronic engineering; Engineering; Electrical engineering; Power quality; Artificial intelligence","score_opus":0.020812056088059926,"score_gpt":0.23856784618199717,"score_spread":0.21775579009393725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137117184","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022305814,0.0005089038,0.9941204,0.00007230358,0.00010094634,0.000027137383,0.00002036586,0.00046502988,0.0024543006],"genre_scores_gemma":[0.2788692,0.0020038576,0.70219177,0.00025729698,0.0002870031,0.00013738834,0.00020425717,0.00016116351,0.015888132],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997265,0.000035781522,0.00002604529,0.00004968397,0.00014336406,0.000018585775],"domain_scores_gemma":[0.99982125,0.0000300388,0.000019326653,0.000026606964,0.00008921771,0.000013512061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025486108,0.000594678,0.00062717043,0.0006548645,0.0003291938,0.0008313666,0.0005973889,0.0005758928,0.004273229],"category_scores_gemma":[0.0005901803,0.00021091965,0.00038020537,0.00047855583,0.00028622194,0.0007822362,0.00055757206,0.0006091929,0.0012801777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013636601,0.000046295605,0.0007590234,0.00031292049,0.00006055339,0.00018372467,0.0001029984,0.03293771,0.06703688,0.01759957,0.0043396624,0.8764844],"study_design_scores_gemma":[0.00006468434,0.0004531987,0.001143822,0.0000850035,0.00018455466,0.0008802844,0.000098426426,0.8302333,0.07968868,0.008450995,0.07864574,0.00007127101],"about_ca_topic_score_codex":0.0013558154,"about_ca_topic_score_gemma":0.0028967327,"teacher_disagreement_score":0.004273229,"about_ca_system_score_codex":0.0003588425,"about_ca_system_score_gemma":0.0004409355,"threshold_uncertainty_score":0.014295399},"labels":[],"label_agreement":null},{"id":"W2138894308","doi":"10.1109/pes.2004.1372821","title":"Reduced-order realization of a nonlinear power network using companion-form state equations with periodic coefficients","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Nonlinear system; Control theory (sociology); Frequency domain; Transfer function; Linearization; Time domain; Harmonic balance; Operating point; Mathematics; Computer science; Applied mathematics; Mathematical analysis; Engineering; Physics; Electronic engineering","score_opus":0.009315116045106106,"score_gpt":0.22021135806208916,"score_spread":0.21089624201698307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138894308","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011870075,0.00007200378,0.9803878,0.000061496015,0.00006212628,0.000051498446,0.00012942252,0.00026306286,0.0071025314],"genre_scores_gemma":[0.59667426,0.00052519573,0.38188887,0.000051319228,0.00007152555,0.00035491897,0.0010101742,0.00011608303,0.019307591],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999002,0.000026950007,0.000006165186,0.000016803346,0.000044408054,0.000005387303],"domain_scores_gemma":[0.99984956,0.00005025703,0.000019524445,0.000037122118,0.000039143386,0.0000044410313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002029525,0.00037134474,0.0003496469,0.00016952727,0.00018209277,0.00052752794,0.00033498745,0.000383385,0.0060254377],"category_scores_gemma":[0.0006729538,0.00018613061,0.00039903523,0.00020236566,0.000248152,0.00055160286,0.00022214297,0.0006429977,0.0008196771],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004919323,0.000032555232,0.00040750566,0.00015893434,0.000022657658,0.00025956915,0.000114495546,0.849274,0.013689159,0.08325969,0.0019611227,0.050771035],"study_design_scores_gemma":[0.0000041801227,0.000022036282,0.00007830614,0.000005224555,0.0000039002584,0.000029052266,0.000006415211,0.9897419,0.0016059013,0.0050298213,0.0034693142,0.0000038688063],"about_ca_topic_score_codex":0.0020451234,"about_ca_topic_score_gemma":0.002945118,"teacher_disagreement_score":0.0060254377,"about_ca_system_score_codex":0.0003112784,"about_ca_system_score_gemma":0.0003543409,"threshold_uncertainty_score":0.020157099},"labels":[],"label_agreement":null},{"id":"W2139817038","doi":"10.1109/pes.2004.1373139","title":"Determination of the transient stability boundary","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Manitoba Hydro","keywords":"Boundary (topology); Nonlinear system; Transient (computer programming); Mathematics; Singular boundary method; Boundary value problem; Stability (learning theory); Mathematical analysis; Mixed boundary condition; Work (physics); Transformation (genetics); Control theory (sociology); Computer science; Applied mathematics; Boundary element method; Physics; Artificial intelligence; Finite element method","score_opus":0.006970495966627953,"score_gpt":0.19696599439333706,"score_spread":0.1899954984267091,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139817038","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005519838,0.000056916226,0.9919337,0.000023782848,0.00001634685,0.000023849625,0.000031434643,0.00039066147,0.0020034292],"genre_scores_gemma":[0.46525806,0.00021726693,0.5300929,0.00004830685,0.00006159408,0.00019781795,0.0003052835,0.00058032916,0.003238352],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991609,0.00016435666,0.00005277262,0.00017340016,0.0003749646,0.0000736199],"domain_scores_gemma":[0.9977858,0.0010595326,0.00024587332,0.00020567402,0.00064532406,0.000057859026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010125437,0.00074218103,0.0010109888,0.0016308111,0.000813341,0.0011259983,0.0007806951,0.00072871643,0.0046050367],"category_scores_gemma":[0.005335752,0.00035899354,0.00059277605,0.00042192446,0.0007276068,0.0017617515,0.001137404,0.0014883036,0.0022536768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004534533,0.0001233587,0.003225772,0.0005093487,0.00006967042,0.00047892617,0.00063748664,0.2768719,0.13609637,0.09384852,0.0051244455,0.48256078],"study_design_scores_gemma":[0.000020103113,0.00007473068,0.0012852424,0.000050842813,0.000015986156,0.00020971571,0.00005150683,0.9293531,0.047330204,0.016123688,0.0054303785,0.00005443683],"about_ca_topic_score_codex":0.0010921983,"about_ca_topic_score_gemma":0.00082015444,"teacher_disagreement_score":0.0046050367,"about_ca_system_score_codex":0.0006149292,"about_ca_system_score_gemma":0.00070938136,"threshold_uncertainty_score":0.015405357},"labels":[],"label_agreement":null},{"id":"W2140006436","doi":"10.1109/pes.2004.1372864","title":"An efficient multi-rate simulation technique for power-electronic-based systems","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Variable (mathematics); Power (physics); Range (aeronautics); State variable; Electric power system; Electronic systems; Coupling (piping); Electronic engineering; Engineering; Mathematics","score_opus":0.007225896992134359,"score_gpt":0.23740422421991186,"score_spread":0.2301783272277775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140006436","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003184664,0.00009869412,0.9936619,0.000046551293,0.000040248688,0.000038511418,0.00003190864,0.00049667974,0.0024008746],"genre_scores_gemma":[0.1940018,0.00045359952,0.79917324,0.00005802757,0.00004987694,0.00036450994,0.00016202057,0.00029794627,0.0054390174],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966645,0.000110981644,0.000016278813,0.000026789921,0.00016103536,0.000018415903],"domain_scores_gemma":[0.9995871,0.00018141863,0.00003302039,0.0000791043,0.00009910309,0.000020188541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007485767,0.0004804957,0.0005628918,0.0003628442,0.0003271221,0.00052968797,0.0010374147,0.0006202349,0.00608602],"category_scores_gemma":[0.0014214937,0.0003325618,0.0005789116,0.00038613778,0.00026016386,0.0007707065,0.00059551175,0.001035033,0.0011694774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008630848,0.000041366813,0.00047108746,0.0001334838,0.0000503637,0.00013039737,0.00010055727,0.87863183,0.015694968,0.034816038,0.002140098,0.06770354],"study_design_scores_gemma":[0.0000065728973,0.000011569276,0.000028087306,0.0000066231983,0.0000044284075,0.000024035162,0.0000023050056,0.99401593,0.0015115552,0.0011792658,0.003205905,0.000003855526],"about_ca_topic_score_codex":0.0014526318,"about_ca_topic_score_gemma":0.001542891,"teacher_disagreement_score":0.00608602,"about_ca_system_score_codex":0.00038657497,"about_ca_system_score_gemma":0.00048970565,"threshold_uncertainty_score":0.020359755},"labels":[],"label_agreement":null},{"id":"W2142042965","doi":"10.1109/pes.2004.1373059","title":"How FACTS controllers function in an AC transmission system","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Winnipeg; Electrovaya (Canada)","funders":"","keywords":"Control theory (sociology); Transmission system; Flexible AC transmission system; Control engineering; Controller (irrigation); Nonlinear system; Computer science; Transmission (telecommunications); Function (biology); Static VAR compensator; Electric power system; AC power; Engineering; Control (management); Voltage; Physics; Electrical engineering; Power (physics)","score_opus":0.0065061691777151785,"score_gpt":0.18886430255115466,"score_spread":0.18235813337343948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142042965","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07492717,0.011304924,0.73993933,0.0022952522,0.00047159113,0.00019797872,0.00032602952,0.00093599677,0.16960181],"genre_scores_gemma":[0.8898096,0.011230764,0.067689806,0.0003125171,0.000311528,0.00019548468,0.00010426128,0.00018783861,0.030158155],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997813,0.00007280467,0.000015392985,0.000046017547,0.00006431132,0.000020171157],"domain_scores_gemma":[0.9998288,0.00008266609,0.0000130536555,0.00001983233,0.00004416921,0.000011314333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028406584,0.0006525186,0.00039124113,0.00052435836,0.00093739317,0.0031874839,0.0004941407,0.0012734133,0.0035131942],"category_scores_gemma":[0.001005074,0.00036571114,0.00036407652,0.0006704518,0.0009773704,0.0022608796,0.00037255956,0.0009679381,0.00077683316],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007813334,0.000045557044,0.0011510479,0.00025875823,0.00005837252,0.00079536217,0.00083828164,0.33220136,0.009342299,0.55472416,0.0032243212,0.097282276],"study_design_scores_gemma":[0.00003565819,0.00012910312,0.0012303836,0.0002550044,0.00009907142,0.0005298076,0.00046570788,0.5735275,0.0062037413,0.3634486,0.054018695,0.000056659643],"about_ca_topic_score_codex":0.004563676,"about_ca_topic_score_gemma":0.0029895054,"teacher_disagreement_score":0.004563676,"about_ca_system_score_codex":0.0006116742,"about_ca_system_score_gemma":0.0005079715,"threshold_uncertainty_score":0.011752784},"labels":[],"label_agreement":null},{"id":"W2142402833","doi":"10.1109/pes.2004.1373141","title":"Improved dynamic security assessment for AC/DC power systems using energy functions","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Independent Electricity System Operator","funders":"","keywords":"Transient (computer programming); Electric power system; Control theory (sociology); Computer science; Energy (signal processing); Power (physics); Function (biology); Stability (learning theory); Mathematics; Control (management); Physics","score_opus":0.005863688000705691,"score_gpt":0.22835882727478768,"score_spread":0.222495139274082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142402833","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029852288,0.0001854639,0.96776855,0.000034859335,0.000013536729,0.000029739893,0.000032282347,0.00030079513,0.00178242],"genre_scores_gemma":[0.8153207,0.00039785923,0.18118225,0.000016460874,0.000029302815,0.000099979225,0.00016574204,0.00013107699,0.002656743],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995999,0.000120697376,0.000020827714,0.00003082372,0.00020260425,0.000025194831],"domain_scores_gemma":[0.99947697,0.00025162045,0.000048046975,0.000069244146,0.00014039355,0.000013775222],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084417127,0.0011020472,0.00050926086,0.0014431236,0.00029113318,0.0008030089,0.00041529894,0.00041713144,0.001833694],"category_scores_gemma":[0.00208074,0.00027428908,0.00049437955,0.0005732171,0.00030541272,0.0018409998,0.00057561375,0.00059453887,0.00036750842],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008627304,0.000037555168,0.0012008689,0.000054437463,0.000030394314,0.00009476802,0.000046732323,0.8761611,0.010718704,0.01971523,0.0004228119,0.09143108],"study_design_scores_gemma":[0.0000037225768,0.000037930542,0.00034251923,0.0000066812595,0.0000048336033,0.000029260878,0.0000067582946,0.99346066,0.002369555,0.0030651046,0.0006652347,0.000007685654],"about_ca_topic_score_codex":0.0011713421,"about_ca_topic_score_gemma":0.000722887,"teacher_disagreement_score":0.001833694,"about_ca_system_score_codex":0.0004151505,"about_ca_system_score_gemma":0.00036394503,"threshold_uncertainty_score":0.006134391},"labels":[],"label_agreement":null},{"id":"W2145803703","doi":"10.1109/pes.2004.1372820","title":"Harmonic domain dynamic transfer function of a nonlinear time-periodic network","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Nonlinear system; Time domain; Transfer function; Describing function; Control theory (sociology); Frequency domain; Transient (computer programming); Linearization; Steady state (chemistry); Harmonic balance; Harmonic; Computer science; Harmonic analysis; Mathematics; Topology (electrical circuits); Mathematical analysis; Physics; Engineering","score_opus":0.0059630700121408855,"score_gpt":0.1981600753350911,"score_spread":0.19219700532295023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145803703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07411635,0.0001268633,0.90806526,0.00019491414,0.00005271621,0.000040463387,0.000075880795,0.00032812732,0.016999345],"genre_scores_gemma":[0.9430345,0.00029009298,0.045373138,0.000073765215,0.000036517024,0.000077865094,0.00010273862,0.000058851492,0.010952538],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99991274,0.000017864433,0.0000024181606,0.000017371302,0.000040390638,0.000009174851],"domain_scores_gemma":[0.99987066,0.000053381373,0.00002096046,0.000017649501,0.000030600775,0.0000066242346],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017062141,0.0002713038,0.0001709753,0.00026823953,0.00018802498,0.00047128982,0.0002534561,0.0003864961,0.0031421802],"category_scores_gemma":[0.00061466964,0.000095077776,0.00020218224,0.0001635227,0.00041830732,0.0005735385,0.00019214925,0.00033285678,0.0003683701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001399203,0.00006526214,0.0011724639,0.00011325992,0.000032168813,0.0004617205,0.00028579886,0.62422585,0.09166915,0.19884767,0.0016931238,0.08129355],"study_design_scores_gemma":[0.0000073368706,0.000047143105,0.00046319293,0.0000066194916,0.000006589385,0.00017799613,0.00003255057,0.97448415,0.006127704,0.015645618,0.0029883634,0.000012630395],"about_ca_topic_score_codex":0.0010250468,"about_ca_topic_score_gemma":0.00051186304,"teacher_disagreement_score":0.0031421802,"about_ca_system_score_codex":0.00041078372,"about_ca_system_score_gemma":0.00021029696,"threshold_uncertainty_score":0.010511637},"labels":[],"label_agreement":null},{"id":"W2147181525","doi":"10.1109/pes.2004.1373021","title":"Full frequency dependent line model for electromagnetic transient simulation including lumped and distributed sources","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Emtp; Laplace transform; Transient (computer programming); Line (geometry); Computer science; Distributed element model; Transmission line; Electric power transmission; Partial differential equation; Electronic engineering; Acoustics; Physics; Mathematical analysis; Engineering; Mathematics; Telecommunications; Electrical engineering; Geometry; Electric power system","score_opus":0.009775386542948605,"score_gpt":0.22939388047818135,"score_spread":0.21961849393523275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2147181525","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035741378,0.00013951336,0.98706543,0.00010296256,0.00009387883,0.00005036087,0.0003619436,0.0013271836,0.0072846278],"genre_scores_gemma":[0.36042264,0.0014450294,0.57976526,0.0002937101,0.00019308574,0.0012391434,0.0031927633,0.0015042905,0.05194409],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998492,0.000035582983,0.000008272134,0.000019959254,0.00007745253,0.000009580858],"domain_scores_gemma":[0.9997713,0.00008767564,0.00001890976,0.00005439032,0.000055218818,0.000012503796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020106818,0.00054692954,0.00050416146,0.00026695925,0.000245016,0.00060111674,0.0012642172,0.0009892347,0.012314657],"category_scores_gemma":[0.00066939095,0.00035559046,0.00046741668,0.00038838867,0.00018774676,0.0010046756,0.00053478027,0.0010207157,0.0041599795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006031811,0.000060668288,0.00049614976,0.00021242021,0.00004217731,0.00020093884,0.00007251446,0.88287187,0.019950809,0.026579067,0.010477319,0.05897575],"study_design_scores_gemma":[0.000008719985,0.000023765806,0.000053861426,0.000008417281,0.000006417425,0.000046888494,0.0000043819628,0.98241985,0.0014833726,0.0027473753,0.013191377,0.0000056314525],"about_ca_topic_score_codex":0.0010058489,"about_ca_topic_score_gemma":0.0015045446,"teacher_disagreement_score":0.012314657,"about_ca_system_score_codex":0.0003793882,"about_ca_system_score_gemma":0.0005004983,"threshold_uncertainty_score":0.041196585},"labels":[],"label_agreement":null},{"id":"W2157152961","doi":"10.1109/pes.2004.1372854","title":"Agent based software integration at distribution control center","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Computer science; System integration; Software; Software development; Software system; Automation; Software engineering; Software construction; Engineering; Operating system","score_opus":0.004525113739514547,"score_gpt":0.1909632678225469,"score_spread":0.18643815408303235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157152961","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029078018,0.00024891907,0.95471823,0.00022869997,0.000066088,0.00017931616,0.000015319765,0.002568665,0.012896631],"genre_scores_gemma":[0.7179615,0.00028705475,0.27054885,0.00016842199,0.00006846805,0.00022632554,0.00011211195,0.00018497327,0.010442397],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864715,0.0003342349,0.000066364795,0.00019708391,0.00064408075,0.00011123905],"domain_scores_gemma":[0.99924636,0.00019481253,0.000085668355,0.00012202176,0.0002681957,0.0000830262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007999456,0.0007222976,0.0006311078,0.0005854752,0.0006086114,0.0016685011,0.0010814021,0.00082992885,0.002129517],"category_scores_gemma":[0.0016001741,0.00035693237,0.00031378274,0.0004476332,0.00050094695,0.0013657074,0.0012930551,0.0011698178,0.00082354544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048573807,0.0011403257,0.003269574,0.00026228116,0.00023657104,0.0012574232,0.0010531334,0.23330893,0.07757786,0.12036193,0.007035497,0.5540108],"study_design_scores_gemma":[0.00010680642,0.00030778543,0.00050006894,0.00003825164,0.00008717386,0.00023719418,0.000067973284,0.9208617,0.029987637,0.015351454,0.032417465,0.00003652741],"about_ca_topic_score_codex":0.0019795217,"about_ca_topic_score_gemma":0.0011673198,"teacher_disagreement_score":0.002129517,"about_ca_system_score_codex":0.00053970155,"about_ca_system_score_gemma":0.0011720547,"threshold_uncertainty_score":0.007123947},"labels":[],"label_agreement":null},{"id":"W2163698039","doi":"10.1109/pes.2004.1373064","title":"Control of interior type PM synchronous motor for high speed operations","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Sensorless Control of Electric Motors","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Electronic speed control; Control theory (sociology); Controller (irrigation); Digital signal processor; Torque; Computer science; Power (physics); Digital signal processing; Inverter; Direct torque control; Synchronous motor; Vector control; Control engineering; Engineering; Control (management); Induction motor; Electrical engineering; Computer hardware; Voltage","score_opus":0.005059227075453054,"score_gpt":0.2027228516616287,"score_spread":0.19766362458617565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163698039","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.091966145,0.00041804565,0.891061,0.00011540337,0.00022314739,0.0001233207,0.00006769079,0.001774755,0.014250455],"genre_scores_gemma":[0.92994565,0.00021773308,0.065521665,0.00006301454,0.000074384494,0.000071416536,0.00007520205,0.00003502674,0.0039958768],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99983406,0.000018712688,0.000011753197,0.000030301591,0.00008996475,0.000015098632],"domain_scores_gemma":[0.9998499,0.000034099732,0.000034983106,0.00001341979,0.000056039757,0.0000115097955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026170956,0.00036595284,0.00023139104,0.00020073986,0.00022756198,0.0003690768,0.0004497253,0.00023531367,0.00188959],"category_scores_gemma":[0.00031994545,0.00008181573,0.00015024056,0.00014371863,0.00018706024,0.000246621,0.00015323315,0.000357686,0.00038792385],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047816258,0.00020866796,0.0012380348,0.00090713403,0.000033821158,0.00040660758,0.00032851132,0.05796854,0.48211244,0.008414431,0.004607048,0.44329652],"study_design_scores_gemma":[0.000271252,0.0014876267,0.006096196,0.000059236965,0.000067707406,0.00070926413,0.00006601961,0.7998438,0.15559563,0.0035243484,0.03222775,0.00005125506],"about_ca_topic_score_codex":0.00041283472,"about_ca_topic_score_gemma":0.0006067913,"teacher_disagreement_score":0.00188959,"about_ca_system_score_codex":0.00016323791,"about_ca_system_score_gemma":0.00017922677,"threshold_uncertainty_score":0.006321311},"labels":[],"label_agreement":null},{"id":"W2164025164","doi":"10.1109/pes.2004.1372973","title":"A new hybrid current sensor for high-voltage applications","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Magnetic Field Sensors Techniques","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Pockels effect; Rogowski coil; Integrator; Current sensor; Linearity; Voltage; Electrical engineering; Electronic engineering; Electromagnetic coil; Current (fluid); Metering mode; Materials science; Engineering; Optics; Physics","score_opus":0.006175114231631134,"score_gpt":0.22009801688820033,"score_spread":0.21392290265656919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164025164","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34649023,0.01897362,0.58197075,0.0016632145,0.0018354412,0.00036474873,0.0010959888,0.008971356,0.038634572],"genre_scores_gemma":[0.62939084,0.0027058232,0.32432196,0.0012612208,0.00045921764,0.00019035285,0.0007552523,0.00019011738,0.040725086],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994635,0.000040729166,0.00001714717,0.00012748803,0.00032348782,0.00002763071],"domain_scores_gemma":[0.9997025,0.000043968717,0.000039896575,0.000021797066,0.00015112369,0.000040698327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030807275,0.0005106138,0.0004795831,0.00051532855,0.00020384014,0.00066413364,0.0009343588,0.00085881265,0.0036662193],"category_scores_gemma":[0.00031330713,0.000270383,0.00020127879,0.0003274672,0.00029790818,0.0013224506,0.0004125371,0.000569907,0.0018517888],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089298344,0.00004171354,0.00034801487,0.0001485622,0.00002288811,0.00007529584,0.000026799315,0.0002961805,0.94599193,0.0010057663,0.0021016966,0.04985175],"study_design_scores_gemma":[0.000030419811,0.00044467306,0.0015250532,0.000013866664,0.00005946171,0.0012787161,0.000024183015,0.011530076,0.9534871,0.00037627722,0.031182632,0.000047465095],"about_ca_topic_score_codex":0.00016118714,"about_ca_topic_score_gemma":0.00038455942,"teacher_disagreement_score":0.0036662193,"about_ca_system_score_codex":0.00042337956,"about_ca_system_score_gemma":0.00015444272,"threshold_uncertainty_score":0.012264729},"labels":[],"label_agreement":null},{"id":"W2166305148","doi":"10.1109/pes.2004.1372857","title":"A sequential phase energization technique for transformer inrush current reduction part 1: simulation and experimental results","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Magnetic Properties and Applications","field":"Materials Science","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Inrush current; Resistor; Transformer; Electrical engineering; Ground; Voltage; Delta-wye transformer; Control theory (sociology); Electronic engineering; Computer science; Current transformer; Engineering","score_opus":0.02025595784381788,"score_gpt":0.2950415544659289,"score_spread":0.274785596622111,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166305148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7101155,0.00039725626,0.27014503,0.00017964984,0.000100307574,0.00024199048,0.00083728187,0.003421276,0.014561744],"genre_scores_gemma":[0.96116734,0.00013558002,0.035149854,0.000013553666,0.0000066154266,0.00010582613,0.00028145663,0.00009581844,0.003043967],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99983776,0.00003351247,0.000010762108,0.000021978938,0.0000791775,0.000016804155],"domain_scores_gemma":[0.99961674,0.00012077725,0.00004409823,0.00009075938,0.00011194736,0.000015722853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028181743,0.00041523247,0.00044137894,0.0003331965,0.00012993402,0.00017909217,0.00042399912,0.00021001902,0.0045034625],"category_scores_gemma":[0.00043571988,0.00014557481,0.0001946514,0.00044297453,0.00019549046,0.00036599924,0.00013253912,0.00020241873,0.00060923846],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017287711,0.00077282364,0.0030767594,0.000694606,0.000094140836,0.00017076904,0.00026376153,0.11009589,0.7123916,0.0020306543,0.004546566,0.1641335],"study_design_scores_gemma":[0.00022820046,0.003122507,0.0035914774,0.000021395672,0.00007228708,0.0002460541,0.00007888827,0.309341,0.67387336,0.00057518104,0.008814272,0.00003535687],"about_ca_topic_score_codex":0.0006897026,"about_ca_topic_score_gemma":0.0008295722,"teacher_disagreement_score":0.0045034625,"about_ca_system_score_codex":0.00022487882,"about_ca_system_score_gemma":0.000117700365,"threshold_uncertainty_score":0.015065551},"labels":[],"label_agreement":null},{"id":"W2167040674","doi":"10.1109/pes.2004.1373273","title":"Comprehensive analysis of a dispersed generation scheme based on microturbine and induction generator","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Alternator; Induction generator; Rectifier (neural networks); Rotor (electric); Inverter; Control theory (sociology); Engineering; Pulse-width modulation; PWM rectifier; Transient (computer programming); Permanent magnet synchronous generator; Generator (circuit theory); Wound rotor motor; Electrical engineering; Automotive engineering; Voltage; Power (physics); Induction motor; Computer science; Physics; Control (management)","score_opus":0.008992210803338941,"score_gpt":0.20339493799877476,"score_spread":0.1944027271954358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167040674","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23476523,0.0018635048,0.7299202,0.00019024668,0.000070264105,0.00017442887,0.00015510402,0.0004478395,0.03241309],"genre_scores_gemma":[0.98388577,0.00042551203,0.01122584,0.000011936979,0.000011549444,0.000038267353,0.000046651046,0.000020885338,0.00433368],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99992895,0.000011098596,0.0000030994947,0.000013921634,0.00003644271,0.000006501434],"domain_scores_gemma":[0.999931,0.000020900285,0.000013628341,0.000009257964,0.000020457957,0.0000047127487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000105645646,0.00026196445,0.00043919164,0.0002204638,0.0002618743,0.00041674392,0.000435291,0.00035498248,0.0025554153],"category_scores_gemma":[0.00026069646,0.00017375094,0.0002719419,0.00023666142,0.00023083069,0.00068479433,0.00015253747,0.00027331695,0.00028481812],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012835403,0.000052230233,0.00067980855,0.0002411663,0.000038881382,0.00031320035,0.00008148943,0.89794457,0.03186005,0.02445691,0.0006941765,0.043509167],"study_design_scores_gemma":[0.000009249844,0.000050941966,0.0003282322,0.000005436583,0.000009819991,0.000052020427,0.0000071944896,0.99528706,0.0017247652,0.0014845148,0.001037318,0.0000034013933],"about_ca_topic_score_codex":0.0019872976,"about_ca_topic_score_gemma":0.001511666,"teacher_disagreement_score":0.0025554153,"about_ca_system_score_codex":0.00043965556,"about_ca_system_score_gemma":0.00026018667,"threshold_uncertainty_score":0.008548737},"labels":[],"label_agreement":null},{"id":"W2296220891","doi":"10.1109/pes.2004.1372748","title":"Hurricane Juan","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nova scotia; Backup; Power (physics); Hurricane katrina; Natural disaster; Aeronautics; Meteorology; Engineering; Geography; Archaeology","score_opus":0.0034285461770704423,"score_gpt":0.19585135566953615,"score_spread":0.1924228094924657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2296220891","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25007382,0.005203871,0.0014419709,0.019588863,0.0030361842,0.00015530274,0.004647334,0.00028265893,0.71557],"genre_scores_gemma":[0.49338317,0.004134378,0.0011336051,0.0034089643,0.0002358867,0.000035356545,0.0025709532,0.00006952247,0.4950282],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.9997793,0.000012189621,0.0000034297386,0.000027869877,0.00009765195,0.00007958507],"domain_scores_gemma":[0.9997019,0.000013695659,0.000025112025,0.000010839035,0.0001638072,0.000084505475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000180158,0.00036030792,0.00013685784,0.00048109313,0.0024901207,0.0010994006,0.0001766284,0.0003911408,0.009690851],"category_scores_gemma":[0.00066503586,0.0001092569,0.0001539239,0.00043386573,0.00039932292,0.0001794121,0.00073690875,0.000570643,0.0013511884],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051005976,0.00003878833,0.09198643,0.00027157704,0.0000814838,0.0039915987,0.0027039023,0.0026265406,0.006706882,0.014283128,0.78789353,0.08890613],"study_design_scores_gemma":[0.000025293324,0.000059055914,0.16725346,0.00020747677,0.000028048466,0.0009833679,0.0038444418,0.0012477892,0.0014006584,0.001222802,0.82368636,0.00004124199],"about_ca_topic_score_codex":0.6819755,"about_ca_topic_score_gemma":0.86894596,"teacher_disagreement_score":0.6819755,"about_ca_system_score_codex":0.0045637693,"about_ca_system_score_gemma":0.004534136,"threshold_uncertainty_score":0.6397948},"labels":[],"label_agreement":null},{"id":"W2479115256","doi":"10.1109/pes.2004.1373108","title":"Switching modules for the extraction/injection of power (without ground or phase reference) from a bundled HV line","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"High-Voltage Power Transmission Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Electric power transmission; Transmission line; Electrical engineering; Power (physics); Electrical impedance; Line (geometry); Electronic engineering; Power transmission; Characteristic impedance; Power-line communication; Electrical conductor; Transmission (telecommunications); AC power; Computer science; Engineering; Voltage; Physics","score_opus":0.021525575367248372,"score_gpt":0.2790460127851906,"score_spread":0.2575204374179422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2479115256","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24064812,0.008178948,0.59044266,0.00094424776,0.0020494743,0.0011153144,0.0018494035,0.00835204,0.14641976],"genre_scores_gemma":[0.73630404,0.0043733534,0.1482882,0.00035769495,0.00052099675,0.00043497005,0.0016646571,0.0003888144,0.10766729],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99983466,0.000027490152,0.000011503454,0.000026845635,0.00007418605,0.000025306837],"domain_scores_gemma":[0.99979967,0.000046860325,0.000026501879,0.000047817615,0.00006080931,0.000018473454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024087197,0.00044469332,0.0003118377,0.000587011,0.0002175799,0.00043071882,0.0008230872,0.00041506562,0.029611522],"category_scores_gemma":[0.000260563,0.00017732143,0.0002969432,0.0005696337,0.00018665438,0.0006119174,0.00028287238,0.0004960071,0.0051040757],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069332804,0.00026407276,0.0018194721,0.0015198773,0.00011428054,0.00039285346,0.00017955464,0.0038290455,0.35504085,0.02278736,0.037759125,0.57560027],"study_design_scores_gemma":[0.0003402591,0.0032845163,0.0071859197,0.00021811727,0.00036059303,0.0018722767,0.000073623676,0.037857547,0.44964793,0.005547362,0.49353856,0.000073270865],"about_ca_topic_score_codex":0.00016309478,"about_ca_topic_score_gemma":0.00044977697,"teacher_disagreement_score":0.029611522,"about_ca_system_score_codex":0.00023793273,"about_ca_system_score_gemma":0.0001549407,"threshold_uncertainty_score":0.099060416},"labels":[],"label_agreement":null},{"id":"W2764751427","doi":"10.1109/pes.2004.1373206","title":"Order reduction of the dynamic model of a linear weakly periodic system Part I: general methodology","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Scientific Research and Discoveries","field":"Physics and Astronomy","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"LTI system theory; Reduction (mathematics); Linearization; Linear system; Model order reduction; Gauss–Seidel method; Control theory (sociology); Gauss; Convergence (economics); Applied mathematics; Computer science; Mathematics; Steady state (chemistry); Algorithm; Nonlinear system; Mathematical analysis; Iterative method; Physics; Control (management)","score_opus":0.019996748831227647,"score_gpt":0.2684400102727891,"score_spread":0.24844326144156142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764751427","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011281576,0.0002665408,0.9949091,0.00005905353,0.000033904704,0.00006280559,0.000079519195,0.000141658,0.003319328],"genre_scores_gemma":[0.14170633,0.0034008117,0.8139271,0.00019680819,0.0003610059,0.0011165404,0.0007288299,0.00048572352,0.038076732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982446,0.000049308368,0.000012862734,0.000029239578,0.00007237652,0.000011826551],"domain_scores_gemma":[0.9998598,0.000050372564,0.00001663476,0.00003138544,0.000036244437,0.000005456469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003857722,0.0006678963,0.0007199857,0.00053579995,0.0003341556,0.00068314973,0.0006959868,0.00044103176,0.011236723],"category_scores_gemma":[0.0006610482,0.00038660888,0.00084991957,0.00042580543,0.0004295216,0.00047658468,0.0006556092,0.0009846404,0.0038743305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056093864,0.00008999681,0.000504102,0.0010203024,0.00006727221,0.00033654986,0.00026914722,0.48878565,0.044089444,0.22551288,0.0077933744,0.23147511],"study_design_scores_gemma":[0.00001161106,0.000112844806,0.00028530537,0.00006158415,0.00002808541,0.00015737467,0.000047488804,0.8917028,0.0067085815,0.06813051,0.03272115,0.00003273665],"about_ca_topic_score_codex":0.0016371476,"about_ca_topic_score_gemma":0.0015137143,"teacher_disagreement_score":0.011236723,"about_ca_system_score_codex":0.00039358684,"about_ca_system_score_gemma":0.0007681495,"threshold_uncertainty_score":0.037590623},"labels":[],"label_agreement":null},{"id":"W2764856124","doi":"10.1109/pes.2004.1373207","title":"Order reduction of the dynamic model of a linear periodic system Part II: frequency dependent lines","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Scientific Research and Discoveries","field":"Physics and Astronomy","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Frequency domain; Reduction (mathematics); Model order reduction; Electric power transmission; Control theory (sociology); Frequency response; Linear system; Time domain; Power (physics); Electric power system; Computer science; Constant (computer programming); Mathematics; Topology (electrical circuits); Mathematical analysis; Physics; Algorithm; Engineering","score_opus":0.008605195340531405,"score_gpt":0.2304865199123674,"score_spread":0.221881324571836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764856124","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023634205,0.00034618698,0.9568851,0.00017706612,0.000116312534,0.00005915268,0.00017672499,0.0005010793,0.018104216],"genre_scores_gemma":[0.81361264,0.0016233223,0.11869034,0.00015505166,0.0002687833,0.0003355846,0.00093310536,0.00045720921,0.06392404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99989295,0.000025970774,0.0000042440215,0.000013731917,0.00005360351,0.000009368238],"domain_scores_gemma":[0.9998841,0.00004203336,0.000015690279,0.000026912432,0.000025687079,0.000005462235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014618254,0.00040985318,0.00043354573,0.00021508145,0.00020725689,0.0004913445,0.00033433372,0.00031321874,0.007364173],"category_scores_gemma":[0.00044436744,0.00018472361,0.00043857584,0.00019733662,0.00034736135,0.00032590964,0.00024173358,0.0006394726,0.0015111838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006052453,0.000042149095,0.00034649106,0.00020413047,0.000036560938,0.000229993,0.00011478333,0.7985127,0.033370752,0.11011466,0.005879715,0.051087685],"study_design_scores_gemma":[0.0000068039303,0.0000673012,0.00022121237,0.00001087036,0.000016480886,0.00006722652,0.000013732579,0.9577205,0.003786384,0.031045983,0.0070311544,0.000012311024],"about_ca_topic_score_codex":0.0015941778,"about_ca_topic_score_gemma":0.0014021866,"teacher_disagreement_score":0.007364173,"about_ca_system_score_codex":0.00035884144,"about_ca_system_score_gemma":0.00031801956,"threshold_uncertainty_score":0.024635673},"labels":[],"label_agreement":null},{"id":"W3143819401","doi":"10.1109/pes.2004.1373138","title":"Large power system stability enhancement using wide-area signals based hierarchical controller","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Control theory (sociology); Governor; Controller (irrigation); Electric power system; Stability (learning theory); Control engineering; Computer science; Power (physics); Multivariable calculus; Engineering; Control (management); Artificial intelligence","score_opus":0.011285865692710598,"score_gpt":0.21406444401745167,"score_spread":0.20277857832474108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3143819401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060484245,0.00028382815,0.9336874,0.00010137273,0.000038233324,0.00006271254,0.00003137486,0.0013395776,0.003971135],"genre_scores_gemma":[0.88134694,0.00009132398,0.11678487,0.00004734939,0.00004694705,0.000070914706,0.00006080066,0.000029332885,0.0015215684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976367,0.00005128209,0.000012660589,0.0000506313,0.000090626025,0.000031225987],"domain_scores_gemma":[0.9997923,0.00004827961,0.00003240477,0.000034041233,0.000071306786,0.00002168368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003552899,0.00053285644,0.00037396795,0.000310556,0.00030031728,0.00046299776,0.000643222,0.00031938107,0.0014740763],"category_scores_gemma":[0.00045290287,0.00014719901,0.00029960377,0.00033606432,0.00033204255,0.0005275066,0.0005271645,0.0005143571,0.00034823673],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025916024,0.00028495138,0.0009998172,0.00016562926,0.00007141661,0.00016448251,0.00022448544,0.48789862,0.18001752,0.023642967,0.002682998,0.3035879],"study_design_scores_gemma":[0.000055107903,0.00026231655,0.0006087241,0.0000060210514,0.000019095924,0.000033990065,0.0000135587925,0.9828227,0.011269622,0.0032409832,0.0016550181,0.000012867419],"about_ca_topic_score_codex":0.0011473293,"about_ca_topic_score_gemma":0.0025945073,"teacher_disagreement_score":0.0014740763,"about_ca_system_score_codex":0.00037030716,"about_ca_system_score_gemma":0.00045214858,"threshold_uncertainty_score":0.004931271},"labels":[],"label_agreement":null},{"id":"W4239606557","doi":"10.1109/pes.2004.1372917","title":"Status and future directions of power system harmonic analysis","year":2004,"lang":"en","type":"article","venue":"IEEE Power Engineering Society General Meeting, 2004.","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Harmonic analysis; Harmonic; Power (physics); Computer science; Electronic engineering; Electrical engineering; Physics; Engineering; Acoustics","score_opus":0.0036767974575966813,"score_gpt":0.18914912488034177,"score_spread":0.18547232742274508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4239606557","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011087958,0.7728726,0.13922672,0.025091486,0.0036996515,0.000056400226,0.00016922898,0.0007049615,0.047091],"genre_scores_gemma":[0.2277518,0.6143481,0.11244615,0.0029567848,0.014485414,0.00011847041,0.00062217744,0.00016743437,0.02710354],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994568,0.00018242757,0.00003725849,0.00006896471,0.00020482772,0.00004965603],"domain_scores_gemma":[0.99699044,0.0015237797,0.000119736535,0.00017263318,0.0010586387,0.00013479311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003080542,0.00043764073,0.00065772387,0.002338798,0.00047523735,0.0025348475,0.0013015729,0.0013432173,0.0120732095],"category_scores_gemma":[0.004127056,0.00025008802,0.00036497434,0.001729737,0.0013939636,0.0043694605,0.00074267626,0.0012713041,0.0023032934],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001563746,0.00015472001,0.0018839636,0.0012913868,0.000042137617,0.000064278356,0.00023476801,0.005761054,0.0018398375,0.06821842,0.024073295,0.8962797],"study_design_scores_gemma":[0.00009232261,0.00031862405,0.0054050065,0.0018719524,0.00012800258,0.0005475187,0.001555112,0.07042286,0.0021463605,0.4209695,0.4964196,0.00012305954],"about_ca_topic_score_codex":0.0016953181,"about_ca_topic_score_gemma":0.0025281697,"teacher_disagreement_score":0.0120732095,"about_ca_system_score_codex":0.0006934729,"about_ca_system_score_gemma":0.00087637536,"threshold_uncertainty_score":0.04038894},"labels":[],"label_agreement":null}]}