{"meta":{"query_hash":"cdafa585b32b","filters":{"venue":"IEEE Transactions on Power Systems"},"cohort_total":442,"direct_labels_cover":1,"predictions_cover":442,"exported":442,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/cdafa585b32b","api":"https://metacan.xera.ac/api/v1/cohort?venue=IEEE+Transactions+on+Power+Systems"},"results":[{"id":"W1965245585","doi":"10.1109/tpwrs.2013.2246841","title":"SSR in Double-Cage Induction Generator-Based Wind Farm Connected to Series-Compensated Transmission Line","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":114,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Induction generator; Wind power; Turbine; Control theory (sociology); Engineering; Wind speed; Transmission line; Generator (circuit theory); MATLAB; Electric power transmission; Marine engineering; Electrical engineering; Power (physics); Computer science; Physics; Mechanical engineering; Meteorology","score_opus":0.01355049961010843,"score_gpt":0.2075299606531407,"score_spread":0.19397946104303226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965245585","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.547066,0.00015924714,0.44323438,0.00026470335,0.005040521,0.0024847297,0.000043918928,0.0008979567,0.00080854725],"genre_scores_gemma":[0.99833834,0.0000045695742,0.00012486962,0.00006258548,0.00008604243,0.0005062797,0.000016127131,0.00013308179,0.00072808884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974997,0.00015456378,0.0008732083,0.0004946707,0.00039640954,0.00058141426],"domain_scores_gemma":[0.99881375,0.00006263807,0.0000713694,0.00055491255,0.0001774577,0.00031985072],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025604683,0.00048564194,0.0006078535,0.00069454906,0.00012526808,0.00017244749,0.00023708741,0.00035983976,0.00023257072],"category_scores_gemma":[0.0000029048488,0.00047177094,0.00014274633,0.0009975875,0.000023887462,0.00035674102,7.793549e-7,0.0005293114,0.00047535822],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014359804,0.00011996456,0.000018085982,0.000117012896,0.00007770712,0.000013399535,0.00044058272,0.76662964,0.23162138,0.000016575197,0.00027768538,0.0005243818],"study_design_scores_gemma":[0.015086315,0.0012681498,0.0016017499,0.0014132793,0.00012431659,0.00016395413,0.0007670887,0.5968764,0.34862372,0.000007732821,0.03153723,0.0025300614],"about_ca_topic_score_codex":0.0012523552,"about_ca_topic_score_gemma":0.00023223243,"teacher_disagreement_score":0.45127237,"about_ca_system_score_codex":0.00038240405,"about_ca_system_score_gemma":0.00006071645,"threshold_uncertainty_score":0.9997734},"labels":[],"label_agreement":null},{"id":"W1966333251","doi":"10.1109/tpwrs.2006.873100","title":"Oscillatory Stability Limit Prediction Using Stochastic Subspace Identification","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":122,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada); University of Waterloo","funders":"","keywords":"Electric power system; Control theory (sociology); Subspace topology; Stability (learning theory); Identification (biology); Tripping; Transient (computer programming); Limit (mathematics); Computer science; System identification; Generator (circuit theory); Noise (video); Mode (computer interface); Engineering; Power (physics); Mathematics; Data modeling; Artificial intelligence; Machine learning","score_opus":0.01629664622567792,"score_gpt":0.20497942554297052,"score_spread":0.1886827793172926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966333251","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06099096,0.00039033833,0.92816865,0.000008728537,0.0075407936,0.00065129297,0.00023631283,0.0011558307,0.00085707614],"genre_scores_gemma":[0.9995277,0.0000057161305,0.00008742173,0.0000029221044,0.000022792401,0.0000824229,0.000012429028,0.000055590335,0.0002029962],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980568,0.00015022387,0.00069213624,0.00040024522,0.00039900723,0.00030156027],"domain_scores_gemma":[0.99902594,0.00010946235,0.00006768024,0.00055612,0.00013719077,0.000103613944],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047847704,0.00026100685,0.00026920403,0.00024301972,0.00021817765,0.00018624136,0.00012372341,0.00019286847,0.00010396871],"category_scores_gemma":[0.00000510124,0.00028404524,0.00013518654,0.00045071993,0.000055819695,0.0004517919,5.5403433e-7,0.00021766541,0.00005098532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011016771,0.000073788775,0.000062160085,0.00014447857,0.000036471534,0.0000010287399,0.00023731908,0.99316335,0.0059982045,0.00006287316,0.00018015994,0.000029131905],"study_design_scores_gemma":[0.0002498444,0.00003138871,0.0006541148,0.00009947489,0.0000416469,0.000023513567,0.00022510401,0.9941853,0.0033974655,0.000005794931,0.0008008657,0.00028542973],"about_ca_topic_score_codex":0.00014672388,"about_ca_topic_score_gemma":0.000059484984,"teacher_disagreement_score":0.93853676,"about_ca_system_score_codex":0.0006470267,"about_ca_system_score_gemma":0.000056810633,"threshold_uncertainty_score":0.9999612},"labels":[],"label_agreement":null},{"id":"W1966716856","doi":"10.1109/tpwrs.2012.2194517","title":"An Optimal Power Flow Algorithm to Achieve Robust Operation Considering Load and Renewable Generation Uncertainties","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Renewable energy; Probabilistic logic; Mathematical optimization; Electric power system; Generator (circuit theory); Electricity generation; Computer science; Power (physics); Power flow; Economic dispatch; Taguchi methods; Control theory (sociology); Reliability engineering; Engineering; Mathematics","score_opus":0.015279905275534439,"score_gpt":0.2163551612215254,"score_spread":0.20107525594599096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966716856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01528625,0.0006611643,0.9771246,0.000033819724,0.004912099,0.000711206,0.000044250854,0.00049092347,0.0007356964],"genre_scores_gemma":[0.97917306,0.000046832323,0.019986253,0.00004354338,0.00010288678,0.0001890843,0.0000160694,0.000088803616,0.0003534558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817324,0.00013134646,0.0004755792,0.00034238622,0.00037319475,0.0005042302],"domain_scores_gemma":[0.99905396,0.000041581818,0.00005053821,0.00040245254,0.00014990632,0.00030157025],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046868774,0.00033504763,0.0003175735,0.00028210806,0.00026618133,0.0002900794,0.000112615315,0.00020454996,0.000063151616],"category_scores_gemma":[0.000005261389,0.0003569753,0.00005207361,0.00032707155,0.000021944858,0.0010897018,0.0000014487773,0.0001943739,0.00005978051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001772275,0.000057506135,0.0000065949835,0.000029099327,0.00006835716,0.000001636652,0.0023587008,0.9869055,0.008903949,0.000012120762,0.00083254336,0.000806282],"study_design_scores_gemma":[0.0003506008,0.0002973123,0.000010092379,0.00006466165,0.00003666359,0.00008747215,0.0005396187,0.9786302,0.01789647,4.354819e-7,0.0016500534,0.00043646482],"about_ca_topic_score_codex":0.00020040733,"about_ca_topic_score_gemma":0.000063928295,"teacher_disagreement_score":0.9638868,"about_ca_system_score_codex":0.00043639782,"about_ca_system_score_gemma":0.000053871845,"threshold_uncertainty_score":0.99988824},"labels":[],"label_agreement":null},{"id":"W1968620963","doi":"10.1109/tpwrs.2012.2214490","title":"Conic AC transmission system planning","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Conic section; Mathematical optimization; Conic optimization; Relaxation (psychology); Second-order cone programming; Electric power system; Integer (computer science); Power flow; Benchmark (surveying); Regular polygon; Linear programming; AC power; Quadratic growth; Mathematics; Computer science; Convex optimization; Power (physics); Algorithm; Convex combination; Geometry","score_opus":0.012545029844858264,"score_gpt":0.22273785472752688,"score_spread":0.21019282488266863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968620963","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03132997,0.001581946,0.9512875,0.000010178275,0.0076502697,0.00038536542,0.00010446356,0.0013006263,0.0063496474],"genre_scores_gemma":[0.9994489,0.0000121966605,0.000098586126,0.000007641801,0.000050094015,0.00009177958,0.000010301264,0.000072065915,0.00020845802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984611,0.00006380202,0.0004053973,0.00019700812,0.00030389684,0.0005687405],"domain_scores_gemma":[0.9992685,0.000054828975,0.000040177907,0.0003258156,0.000040392108,0.0002703335],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025849423,0.00028617028,0.00029206424,0.00015885783,0.0001615857,0.000064286214,0.00014712506,0.00021433631,0.000063993124],"category_scores_gemma":[8.8413816e-7,0.00028344893,0.00014061859,0.00025102813,0.000023671262,0.00040274934,4.2981932e-7,0.00033774698,0.00056215876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099899415,0.00027691506,0.000111042515,0.0011463006,0.00037786987,0.000024244482,0.0025739654,0.9606995,0.0270863,0.00075497,0.00541132,0.001437693],"study_design_scores_gemma":[0.0041458765,0.00082785223,0.0010427055,0.004098492,0.00055704155,0.0009908371,0.0068334225,0.60166335,0.13992809,0.0000037570264,0.23634829,0.0035602867],"about_ca_topic_score_codex":0.000016482843,"about_ca_topic_score_gemma":3.6444484e-7,"teacher_disagreement_score":0.9681189,"about_ca_system_score_codex":0.00040643525,"about_ca_system_score_gemma":0.000016202644,"threshold_uncertainty_score":0.9999618},"labels":[],"label_agreement":null},{"id":"W1968983472","doi":"10.1109/tpwrs.2013.2264904","title":"Utilization of the Area Risk Concept for Operational Reliability Evaluation of a Wind-Integrated Power System","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Reliability engineering; Reliability (semiconductor); Electric power system; Turbine; Wind speed; Engineering; Power (physics); Electrical engineering; Meteorology; Aerospace engineering","score_opus":0.02116232363307804,"score_gpt":0.2333632218346043,"score_spread":0.21220089820152627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1968983472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14589804,0.00022546436,0.8439972,0.000027122025,0.004532635,0.0033943052,0.0006185445,0.0001397625,0.0011669645],"genre_scores_gemma":[0.9992306,0.0000053415574,0.000115419694,0.0000059280205,0.000007740899,0.00045424202,0.000009030571,0.00003221754,0.00013948217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997569,0.0003834361,0.0009010564,0.00028875662,0.0006352886,0.00022242974],"domain_scores_gemma":[0.9972552,0.00023142346,0.00024211426,0.00069706154,0.001511819,0.00006236688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001290662,0.00023084758,0.00041501288,0.00010077805,0.000119739765,0.000034092165,0.00024311987,0.0001950056,0.00010266068],"category_scores_gemma":[0.000087666784,0.00016689571,0.0002459067,0.00036480685,0.00010879609,0.00024905254,0.0000012969302,0.00018275101,0.000015073933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033457676,0.00013480827,0.00015595039,0.00045297312,0.0001504058,4.7150888e-8,0.0011588122,0.99339724,0.0024808897,0.0004641236,0.0012896226,0.00028165232],"study_design_scores_gemma":[0.0011569199,0.00017257793,0.0013612933,0.0007538914,0.00017768632,0.000008415662,0.0021872642,0.9631618,0.029658534,0.000038665217,0.0010759741,0.00024692476],"about_ca_topic_score_codex":0.00044331205,"about_ca_topic_score_gemma":0.00003083893,"teacher_disagreement_score":0.8533325,"about_ca_system_score_codex":0.00039959597,"about_ca_system_score_gemma":0.00014799128,"threshold_uncertainty_score":0.680581},"labels":[],"label_agreement":null},{"id":"W1974055302","doi":"10.1109/tpwrs.2014.2361451","title":"On Dynamic Evaluation of Harmonics Using Generalized Averaging Techniques","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Frequency domain; Time domain; Harmonics; Spurious relationship; Harmonic; Transient (computer programming); Domain (mathematical analysis); Computer science; Fourier transform; Waveform; Control theory (sociology); Fictitious domain method; Matching (statistics); Harmonic analysis; Algorithm; Mathematics; Mathematical analysis; Engineering; Physics; Acoustics; Voltage; Artificial intelligence","score_opus":0.037888061086120216,"score_gpt":0.2856342451161229,"score_spread":0.24774618403000268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1974055302","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19058424,0.00016104324,0.805595,0.000010989449,0.0017614091,0.0003405047,0.000029655877,0.00030801335,0.0012091326],"genre_scores_gemma":[0.99910635,0.000034844754,0.0006704412,0.000032502932,0.000009494987,0.000049482423,0.0000031910615,0.0000505473,0.00004312905],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837685,0.00023021775,0.00043787045,0.00020199991,0.0005295082,0.00022354857],"domain_scores_gemma":[0.9992375,0.00008553909,0.00008111632,0.00040177646,0.00013181513,0.00006227804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010989124,0.00020095077,0.00028954094,0.00025184103,0.000106603984,0.000039895338,0.00013775144,0.0001434452,0.000043519187],"category_scores_gemma":[0.000007247986,0.00021273199,0.000120912344,0.00019413963,0.00002680848,0.00012525487,6.276371e-7,0.00023867903,0.000021271879],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020567439,0.00010042488,8.1639985e-7,0.00012200583,0.00010025544,5.142219e-7,0.00056068855,0.96447736,0.031487085,0.0005613509,0.00008213295,0.0024868161],"study_design_scores_gemma":[0.00044253957,0.000094715906,0.000006166865,0.00021736829,0.000095111056,0.000007663881,0.000057833906,0.94231486,0.055618968,0.00016826688,0.00075355935,0.0002229278],"about_ca_topic_score_codex":0.000053769763,"about_ca_topic_score_gemma":0.0000113751385,"teacher_disagreement_score":0.8085221,"about_ca_system_score_codex":0.00032622574,"about_ca_system_score_gemma":0.000036886846,"threshold_uncertainty_score":0.86749583},"labels":[],"label_agreement":null},{"id":"W1976622681","doi":"10.1109/tpwrs.2007.907963","title":"Real-Time Transient Simulation Based on a Robust Two-Layer Network Equivalent","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"SNC-Lavalin (Canada); University of Alberta","funders":"","keywords":"Electric power system; Emtp; Robustness (evolution); Transient (computer programming); Computer science; Oscilloscope; Power system simulation; Real-time simulation; Electronic engineering; Simulation; Control theory (sociology); Power (physics); Engineering; Voltage; Electrical engineering","score_opus":0.017512738236213972,"score_gpt":0.24719513908750554,"score_spread":0.22968240085129157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976622681","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013213325,0.000050749797,0.9469317,0.0000289099,0.0035106142,0.0010878684,0.000031543084,0.0009693414,0.03417593],"genre_scores_gemma":[0.99846137,0.0000058268984,0.00013230287,0.000057968115,0.00013945835,0.0000812475,0.000010943716,0.00012080611,0.0009900837],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99719024,0.00015397517,0.0008758371,0.00042637254,0.0006765581,0.0006770177],"domain_scores_gemma":[0.998324,0.0005627925,0.00010505989,0.0006214002,0.00011060545,0.0002761786],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00084335153,0.0004339593,0.00048837817,0.00034214498,0.0002105722,0.0001352945,0.00017304205,0.00023128925,0.0003047306],"category_scores_gemma":[0.0000034041677,0.00042581436,0.00029421778,0.00050158746,0.000025850211,0.00019358606,4.3538768e-7,0.00030453663,0.0005942978],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002022597,0.00009854123,0.000008755327,0.000054494896,0.000094977644,0.000013519461,0.00015440806,0.9948873,0.00360644,0.000060009796,0.00029388507,0.0005254033],"study_design_scores_gemma":[0.0017942004,0.00020247459,0.000201201,0.0002388921,0.000055410685,0.0000044923936,0.00005564117,0.99315596,0.00055199617,0.0000024076294,0.003310711,0.00042660016],"about_ca_topic_score_codex":0.00008621168,"about_ca_topic_score_gemma":0.000027431443,"teacher_disagreement_score":0.985248,"about_ca_system_score_codex":0.00037574492,"about_ca_system_score_gemma":0.000031137664,"threshold_uncertainty_score":0.99981934},"labels":[],"label_agreement":null},{"id":"W1980372699","doi":"10.1109/tpwrs.2002.800871","title":"Determination of the optimum routine test and self-checking intervals in protective relaying using a reliability model","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Dependability; Relay; Reliability (semiconductor); Protective relay; Computer science; Markov model; Markov chain; Markov process; Engineering; Power (physics); Statistics; Mathematics","score_opus":0.017129943996203705,"score_gpt":0.21773575595789255,"score_spread":0.20060581196168883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1980372699","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2817175,0.00013537693,0.716116,0.000023812247,0.00066117075,0.00081806193,0.000020179465,0.00011921157,0.00038864109],"genre_scores_gemma":[0.998798,0.000016690406,0.0009858023,0.0000058986884,0.0000044164817,0.00010405016,7.414083e-8,0.00002890773,0.000056163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863595,0.000116141324,0.0005544048,0.00026473793,0.00019547097,0.00023332104],"domain_scores_gemma":[0.99921644,0.00014857567,0.000103815066,0.00040263392,0.00008420421,0.000044342094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005558044,0.0001906095,0.0003018502,0.0001319179,0.00009238119,0.00003073337,0.00014579223,0.00014295023,0.0000036427334],"category_scores_gemma":[0.00004262645,0.00015773962,0.00009292953,0.0003199328,0.00005444416,0.0002464361,0.0000031252648,0.00032685007,0.0000020965317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008230009,0.0002209112,0.0003794544,0.0006065204,0.000020643776,0.0000017007445,0.005348154,0.9879848,0.0051573184,0.000015840387,0.0000058474975,0.00025059542],"study_design_scores_gemma":[0.00032696276,0.000048138747,0.00018219757,0.00079649256,0.000020761921,0.000029339231,0.00026673917,0.99352527,0.00460637,0.00002407002,0.00001751602,0.00015614562],"about_ca_topic_score_codex":0.00012892095,"about_ca_topic_score_gemma":0.00003567976,"teacher_disagreement_score":0.7170805,"about_ca_system_score_codex":0.00036851424,"about_ca_system_score_gemma":0.000014003144,"threshold_uncertainty_score":0.6432435},"labels":[],"label_agreement":null},{"id":"W1981074152","doi":"10.1109/tpwrs.2012.2207972","title":"Implementing Virtual Inertia in DFIG-Based Wind Power Generation","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":455,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Control theory (sociology); Inertia; Wind power; Electric power system; Islanding; Capacitor; Computer science; Energy storage; Power (physics); Engineering; Renewable energy; Control engineering; Distributed generation; Voltage; Electrical engineering; Control (management); Physics","score_opus":0.010086845742446332,"score_gpt":0.20629782198336968,"score_spread":0.19621097624092335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981074152","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.103206575,0.0005488153,0.8916325,0.000022127899,0.0034149818,0.00032832622,0.00003121187,0.00019949819,0.00061597466],"genre_scores_gemma":[0.99955577,0.000011521594,0.00012585321,0.00004610016,0.000060129667,0.000054695884,0.000013856577,0.000041879608,0.000090209054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882305,0.000055337212,0.00037457657,0.00014629783,0.00016190132,0.00043884237],"domain_scores_gemma":[0.99962664,0.00002769961,0.000037006233,0.00019215213,0.00003354725,0.00008292913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002852374,0.00017838812,0.00017456553,0.0002354955,0.000092119706,0.00006246541,0.00007197804,0.00010610222,0.00018602163],"category_scores_gemma":[0.0000017409708,0.00018299517,0.00006736135,0.00022912954,0.000009213239,0.00030978187,4.856959e-7,0.00016694593,0.000079278514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010634148,0.00007547556,0.00016203633,0.000012734133,0.00003238956,0.0000010625648,0.0004761658,0.9786262,0.019615369,0.00003571487,0.0003261287,0.00062612514],"study_design_scores_gemma":[0.0016092828,0.00010927616,0.00044328123,0.00007320328,0.00003708846,0.0000094886855,0.00032006108,0.9585901,0.022324536,4.087324e-7,0.016001543,0.00048171927],"about_ca_topic_score_codex":0.000051644554,"about_ca_topic_score_gemma":0.00007567797,"teacher_disagreement_score":0.8963492,"about_ca_system_score_codex":0.00012938578,"about_ca_system_score_gemma":0.00001560367,"threshold_uncertainty_score":0.7462326},"labels":[],"label_agreement":null},{"id":"W1981725366","doi":"10.1109/tpwrs.2014.2332058","title":"Power Quality Assessment in Distribution Systems Embedded With Plug-In Hybrid and Battery Electric Vehicles","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Advanced Battery Technologies Research","field":"Engineering","cited_by":214,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Monte Carlo method; Automotive engineering; Voltage; Transformer; Electric vehicle; Engineering; Distribution transformer; Electrical engineering; Power quality; Plug-in; Power (physics); Computer science; Physics","score_opus":0.012669366547570773,"score_gpt":0.26577653504038734,"score_spread":0.25310716849281656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981725366","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43635935,0.00012125161,0.5621749,0.00003463472,0.0003499861,0.00041192846,0.00004228027,0.00026382122,0.00024179608],"genre_scores_gemma":[0.9994629,0.000043926837,0.000051677656,0.000007394399,0.0000066308617,0.0003183437,0.000007625986,0.000045280736,0.000056236007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99796873,0.00021662244,0.00051307667,0.00039261792,0.00039041514,0.00051855366],"domain_scores_gemma":[0.9990681,0.00026399406,0.00005851963,0.00047963296,0.000050166043,0.00007958233],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005649162,0.00027011847,0.00042829456,0.0004017181,0.00006943745,0.00010040217,0.00018721908,0.00014235456,0.0000067171663],"category_scores_gemma":[0.000010269521,0.0002475552,0.000036904596,0.00055663707,0.000055425517,0.00025752562,0.0000024831747,0.00069689145,0.000013485837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015290447,0.00036664732,0.0058436776,0.0007531888,0.0001354843,0.00007357827,0.00020866269,0.97115433,0.018126288,0.00056383933,0.00028661723,0.0023347996],"study_design_scores_gemma":[0.006234862,0.0016605156,0.07409861,0.0018275534,0.000041408664,0.0003483685,0.0026568265,0.8701402,0.036976006,0.000110813504,0.0034804465,0.002424391],"about_ca_topic_score_codex":0.00014764036,"about_ca_topic_score_gemma":0.0000627494,"teacher_disagreement_score":0.56310356,"about_ca_system_score_codex":0.00066312926,"about_ca_system_score_gemma":0.000029799998,"threshold_uncertainty_score":0.9999977},"labels":[],"label_agreement":null},{"id":"W1982200682","doi":"10.1109/tpwrs.2011.2160100","title":"Online Set Point Adjustment for Trajectory Shaping in Microgrid Applications","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Microgrid; Trajectory; Set (abstract data type); Variable (mathematics); Control theory (sociology); Point (geometry); Computer science; Set point; Control engineering; Engineering; Control (management); Mathematics; Artificial intelligence","score_opus":0.028856800305236255,"score_gpt":0.22354978300529177,"score_spread":0.19469298270005553,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982200682","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017727442,0.002630217,0.9921073,0.000012744244,0.001318316,0.0013017984,0.00031047282,0.00026662328,0.00027981776],"genre_scores_gemma":[0.9959804,0.00028262672,0.0021747993,0.00004434064,0.000041132593,0.0012814834,0.00002912763,0.00005310027,0.00011302952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990682,0.000021310025,0.00036811785,0.00021191125,0.000082385086,0.00024809872],"domain_scores_gemma":[0.9995859,0.000033241682,0.000036759986,0.00023266928,0.00004440896,0.00006699497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010066069,0.00017663925,0.00020774794,0.00021671296,0.000058165817,0.000018599547,0.000116623596,0.00010122182,0.00005405136],"category_scores_gemma":[5.9513064e-7,0.00018423265,0.00010391244,0.00018150057,0.000014976201,0.00010718013,3.9000784e-7,0.00014286817,0.000027941078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000102644924,0.0008177719,0.000020642183,0.00038562337,0.00024296477,0.0000032527898,0.0032499004,0.9739939,0.010158514,0.00010340944,0.0012592169,0.009662155],"study_design_scores_gemma":[0.0059491773,0.00057148223,0.0009781262,0.0005366437,0.00025442112,0.000072281844,0.0028849756,0.89568895,0.027880955,0.00006118604,0.06346512,0.0016566544],"about_ca_topic_score_codex":0.00006880574,"about_ca_topic_score_gemma":0.00013719064,"teacher_disagreement_score":0.9942076,"about_ca_system_score_codex":0.00014043336,"about_ca_system_score_gemma":0.000017095672,"threshold_uncertainty_score":0.75127894},"labels":[],"label_agreement":null},{"id":"W1988888488","doi":"10.1109/tpwrs.2012.2223491","title":"Voltage and Reactive Power Impacts on Successful Operation of Islanded Microgrids","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":57,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Microgrid; Dispatchable generation; AC power; Probabilistic logic; Reliability (semiconductor); Voltage; Wind power; Reliability engineering; Power (physics); Voltage optimisation; Engineering; Computer science; Electric power system; Control theory (sociology); Control engineering; Distributed generation; Renewable energy; Electrical engineering; Control (management)","score_opus":0.005327881866039765,"score_gpt":0.19863868451048436,"score_spread":0.19331080264444458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988888488","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2635595,0.0017272444,0.727984,0.000024184463,0.0031246643,0.0005973709,0.00012955119,0.00021063897,0.0026428555],"genre_scores_gemma":[0.9995781,0.00014796024,0.0000442996,0.00002257572,0.000027335882,0.00003394809,0.0000059537083,0.000035911893,0.000103890874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991267,0.000039275805,0.00028606024,0.00014534121,0.00015173462,0.00025092013],"domain_scores_gemma":[0.99952203,0.000053609987,0.000053316533,0.00020518656,0.00005685737,0.00010900663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015771875,0.00019309805,0.00024158653,0.00017279906,0.00007031295,0.000050076993,0.000062823,0.00013000262,0.000062741026],"category_scores_gemma":[0.0000024665012,0.00017323099,0.00006303523,0.0001307727,0.000024760091,0.0003525525,5.4135035e-7,0.00016533925,0.000033871012],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050548464,0.0009074199,0.0008098266,0.0004018231,0.0008178415,0.000006486732,0.011353433,0.56330585,0.4150925,0.0002605146,0.002028011,0.0045108213],"study_design_scores_gemma":[0.0075171757,0.0019006286,0.0069087236,0.00093959103,0.00042812285,0.00020836043,0.0033662864,0.14620505,0.81386286,0.000011664434,0.0164467,0.002204857],"about_ca_topic_score_codex":0.000070171416,"about_ca_topic_score_gemma":0.000014592254,"teacher_disagreement_score":0.73601866,"about_ca_system_score_codex":0.00007301716,"about_ca_system_score_gemma":0.000011352599,"threshold_uncertainty_score":0.7064155},"labels":[],"label_agreement":null},{"id":"W1989077898","doi":"10.1109/tpwrs.2013.2278847","title":"Accommodating High Penetrations of PEVs and Renewable DG Considering Uncertainties in Distribution Systems","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Time horizon; Mathematical optimization; Renewable energy; Sorting; Pareto principle; Linear programming; Genetic algorithm; Computer science; Electric power system; Integer programming; Engineering; Operations research; Power (physics); Algorithm; Mathematics","score_opus":0.006464471287632917,"score_gpt":0.1848067766123578,"score_spread":0.1783423053247249,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989077898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58653253,0.0006829967,0.4105382,0.000026851181,0.0010075886,0.000458839,0.00008132044,0.00012940352,0.000542291],"genre_scores_gemma":[0.99961174,0.00006062122,0.00008289373,0.0000036227555,0.000010224221,0.00009616548,0.000009251917,0.000021292559,0.00010420622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990231,0.000040718736,0.00042502471,0.00014861723,0.00013962016,0.00022291153],"domain_scores_gemma":[0.9995414,0.000088701134,0.00006060466,0.00018548223,0.00006865463,0.000055146967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103354185,0.00015570682,0.0002579573,0.00013066454,0.00008928321,0.00010071084,0.00007274269,0.00011770097,0.000029999535],"category_scores_gemma":[0.000003857399,0.00015211392,0.000033899578,0.0002636897,0.000030519714,0.00028923148,9.011323e-7,0.0001949195,0.0000054044403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033163365,0.000016814183,0.00029100227,0.00021295488,0.000043006614,0.0000010101112,0.0002880443,0.9870408,0.0109574795,0.00034249248,0.00054291345,0.00026017244],"study_design_scores_gemma":[0.0011861154,0.00026408923,0.0055242893,0.0009178712,0.0000575705,0.00011490205,0.004545863,0.9563318,0.028826,0.00020104948,0.001291302,0.0007391463],"about_ca_topic_score_codex":0.005051185,"about_ca_topic_score_gemma":0.00016911323,"teacher_disagreement_score":0.4130792,"about_ca_system_score_codex":0.00010925317,"about_ca_system_score_gemma":0.000020028012,"threshold_uncertainty_score":0.7635914},"labels":[],"label_agreement":null},{"id":"W1991053377","doi":"10.1109/tpwrs.2014.2360369","title":"A Fully Decentralized Approach for Solving the Economic Dispatch Problem","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":162,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Economic dispatch; Mathematical optimization; Computer science; Nondeterministic algorithm; Flooding (psychology); Electric power system; Power (physics); Mathematics; Algorithm","score_opus":0.006813465047826147,"score_gpt":0.1927440587862599,"score_spread":0.18593059373843374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991053377","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009355586,0.00017507863,0.9900269,0.000038516177,0.0026430117,0.0015826415,0.00003355916,0.00050113216,0.0040636295],"genre_scores_gemma":[0.995688,0.00002761849,0.0025706182,0.000020151298,0.000038141734,0.0010129189,0.000007879593,0.000093500865,0.0005411315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985547,0.00008055506,0.0004703107,0.00029449712,0.00015678299,0.00044313696],"domain_scores_gemma":[0.9991446,0.00018231342,0.00008039949,0.0004558133,0.00004550674,0.00009136127],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048663563,0.00025894545,0.000309561,0.0001235897,0.00022088396,0.00016303008,0.00027460264,0.00013745738,0.000015697531],"category_scores_gemma":[0.0000034956795,0.00020933131,0.00015593582,0.00016962201,0.00002140096,0.00017127182,6.4736156e-7,0.00017997697,0.000056573448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018692086,0.000026086986,0.000006695552,0.00015971833,0.00011358239,1.2394197e-7,0.00038555983,0.9959628,0.00037967894,0.00046542054,0.0021374838,0.00034416976],"study_design_scores_gemma":[0.00067770656,0.000085598964,0.000005140439,0.000054286655,0.000052344596,0.000023638037,0.000087665685,0.98675007,0.0013986861,0.00001267189,0.010579666,0.00027255557],"about_ca_topic_score_codex":0.00005829932,"about_ca_topic_score_gemma":0.000022484988,"teacher_disagreement_score":0.99475247,"about_ca_system_score_codex":0.00036936722,"about_ca_system_score_gemma":0.000038631595,"threshold_uncertainty_score":0.8536283},"labels":[],"label_agreement":null},{"id":"W1991439803","doi":"10.1109/tpwrs.2012.2210569","title":"Cumulant Based Stochastic Reactive Power Planning Method for Distribution Systems With Wind Generators","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Cumulant; Monte Carlo method; Mathematical optimization; Electric power system; Wind power; Control theory (sociology); AC power; Probability density function; Stochastic optimization; Computer science; Interior point method; Wind speed; Probability distribution; Generator (circuit theory); Power (physics); Engineering; Mathematics; Voltage; Statistics","score_opus":0.015481691640392672,"score_gpt":0.2534244760233474,"score_spread":0.23794278438295471,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991439803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022684261,0.00039532076,0.9666051,0.000012613599,0.0059355614,0.0014246706,0.002241979,0.00054920313,0.00015126432],"genre_scores_gemma":[0.99774504,7.5885765e-7,0.0013464093,0.000011819868,0.00008106586,0.00044286295,0.00020724794,0.00011681567,0.00004799631],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978079,0.0001280185,0.00049880263,0.0003747914,0.00042481002,0.00076565717],"domain_scores_gemma":[0.99867606,0.00027198275,0.00012374605,0.0004387182,0.0001887275,0.0003007858],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005464075,0.00046925154,0.00048504872,0.00018605872,0.00025106064,0.00013318138,0.0001501795,0.00026461508,0.000014465139],"category_scores_gemma":[0.000009814491,0.00042821665,0.00015583957,0.00036453598,0.00003776998,0.00046596013,8.615312e-7,0.00035661983,0.00004823732],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018787572,0.0001416976,0.000020004982,0.00012986241,0.00023327571,0.0000034397488,0.00031644708,0.99509877,0.0027641288,0.00013886936,0.00093542313,0.00003022663],"study_design_scores_gemma":[0.0018577467,0.0006976657,0.00012504621,0.0005730563,0.00031640715,0.00012333062,0.0011163262,0.9746443,0.013988258,0.0000015986652,0.0055411006,0.0010151544],"about_ca_topic_score_codex":0.000057725767,"about_ca_topic_score_gemma":0.0000019459328,"teacher_disagreement_score":0.97506076,"about_ca_system_score_codex":0.0007161106,"about_ca_system_score_gemma":0.000055652483,"threshold_uncertainty_score":0.99981695},"labels":[],"label_agreement":null},{"id":"W1991518670","doi":"10.1109/tpwrs.2004.841153","title":"A Novel Energy Operator Algorithm for Voltage Envelope Tracking","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy operator; Algorithm; Envelope (radar); Waveform; Energy (signal processing); Tracking (education); Operator (biology); Voltage; Distortion (music); Noise (video); Computer science; Control theory (sociology); Mathematics; Engineering; Telecommunications; Artificial intelligence; Electrical engineering; Radar","score_opus":0.02525486846293582,"score_gpt":0.23977199499077062,"score_spread":0.2145171265278348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991518670","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004678747,0.0005189511,0.9934652,0.000053097316,0.0034218312,0.0002859026,0.00041134402,0.00048489275,0.0008909397],"genre_scores_gemma":[0.99298286,0.000064629654,0.0046265805,0.00016622017,0.00010527926,0.0002565023,0.0000070113138,0.00008846206,0.0017024599],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99867606,0.000018859097,0.00043154613,0.0002659637,0.00020969071,0.0003978858],"domain_scores_gemma":[0.9993565,0.00008901912,0.000034976732,0.00030167418,0.00007380057,0.00014400532],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021825578,0.00025946085,0.00029450518,0.00015452267,0.00017631892,0.0001253334,0.00019577415,0.00018352669,0.00006076957],"category_scores_gemma":[0.0000018832968,0.0002737277,0.00016501945,0.0001796491,0.000023143377,0.00030432976,5.8689096e-7,0.00020721108,0.000071410526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060967228,0.0009211356,9.485735e-7,0.00035368348,0.00093018054,0.000013507742,0.004954752,0.6662032,0.0834619,0.0030457035,0.008125381,0.23192863],"study_design_scores_gemma":[0.0010586026,0.00009240739,0.0000044263493,0.00009963906,0.000044634286,0.00004491785,0.00024544826,0.44173732,0.061734226,0.0000050645986,0.49441025,0.00052305846],"about_ca_topic_score_codex":0.00005713698,"about_ca_topic_score_gemma":0.00006547906,"teacher_disagreement_score":0.99251497,"about_ca_system_score_codex":0.00018532778,"about_ca_system_score_gemma":0.00003914692,"threshold_uncertainty_score":0.9999715},"labels":[],"label_agreement":null},{"id":"W1992485468","doi":"10.1109/tpwrs.2012.2205279","title":"Estimation of Electromechanical Modes of Power Systems by Transfer Function and Eigenfunction Analysis","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Eigenvalues and eigenvectors; Eigenfunction; Computation; Algorithm; Computer science; Applied mathematics; Mathematics; Physics; Quantum mechanics","score_opus":0.007307575919841607,"score_gpt":0.19934913378969926,"score_spread":0.19204155786985766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992485468","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10054493,0.0010495697,0.89563537,0.000003198552,0.0015343848,0.00043144985,0.00014421885,0.00016034892,0.0004965535],"genre_scores_gemma":[0.9996857,0.0000364187,0.000051942785,0.0000030005697,0.0000033553138,0.00007790297,0.000017151304,0.000034800385,0.00008969473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981614,0.00016333714,0.00078888366,0.0002312127,0.0003706081,0.00028456675],"domain_scores_gemma":[0.99921876,0.00008695203,0.0000863321,0.00035006832,0.00011213691,0.00014573903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005058594,0.0002454148,0.000575513,0.0004113639,0.000069676644,0.000031368614,0.000076731536,0.00022694402,0.00007547639],"category_scores_gemma":[0.0000040981577,0.00023840654,0.00018978915,0.0007560547,0.000039188024,0.00039222295,5.744304e-7,0.00015957557,0.000006948803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099663455,0.00025175163,0.0002073972,0.00036095237,0.000981811,9.002458e-8,0.0005250678,0.9718268,0.024583533,0.0009578277,0.00009633826,0.00010875989],"study_design_scores_gemma":[0.0006549405,0.0003585202,0.00045938356,0.000084869855,0.00084221386,0.000010956377,0.0006557998,0.9753698,0.02094281,0.000005873124,0.00024798317,0.00036685134],"about_ca_topic_score_codex":0.00009344538,"about_ca_topic_score_gemma":0.000007553128,"teacher_disagreement_score":0.89914083,"about_ca_system_score_codex":0.000118104275,"about_ca_system_score_gemma":0.000014674473,"threshold_uncertainty_score":0.97219366},"labels":[],"label_agreement":null},{"id":"W1992972827","doi":"10.1109/tpwrs.2012.2186155","title":"Fast Heuristics for Transmission-Line Switching","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Heuristic; Mathematical optimization; Computer science; Line (geometry); Linear programming; Integer programming; Algorithm; Mathematics","score_opus":0.012935029410388594,"score_gpt":0.22774537180671672,"score_spread":0.21481034239632812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992972827","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00085953233,0.0010675514,0.9877833,0.000023400464,0.007138419,0.0007741483,0.000056727004,0.0006751404,0.0016217863],"genre_scores_gemma":[0.99660903,0.000054606913,0.002146627,0.000019464513,0.0000887066,0.00022712443,0.000006938773,0.00011515943,0.00073232956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984697,0.00004825481,0.00049885985,0.00019557751,0.00025364957,0.00053394295],"domain_scores_gemma":[0.99917805,0.00015800633,0.00005690277,0.00030849854,0.000076930315,0.00022163628],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003156709,0.00027673453,0.00030720144,0.0002268608,0.00017328557,0.00006185398,0.00014891753,0.00018136077,0.000025397276],"category_scores_gemma":[0.0000043023124,0.0002726129,0.0001405049,0.00031045795,0.000009039452,0.00028209435,2.9043954e-7,0.0002318549,0.00007148249],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003463523,0.00016375058,0.000009675835,0.0002984837,0.00015697832,0.00000133793,0.0013218964,0.9874339,0.005235215,0.000199278,0.0023568375,0.0027880142],"study_design_scores_gemma":[0.0011587428,0.00022411709,0.000013017146,0.00024761542,0.00013608138,0.000093293245,0.00023927071,0.9354877,0.019815885,0.000009054727,0.041848443,0.00072681665],"about_ca_topic_score_codex":0.000012708556,"about_ca_topic_score_gemma":0.0000015081239,"teacher_disagreement_score":0.99574953,"about_ca_system_score_codex":0.00017607985,"about_ca_system_score_gemma":0.000021088337,"threshold_uncertainty_score":0.9999726},"labels":[],"label_agreement":null},{"id":"W1993328790","doi":"10.1109/tpwrs.2014.2388193","title":"Load Decomposition at Smart Meters Level Using Eigenloads Approach","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart meter; Metering mode; Computer science; Load balancing (electrical power); Real-time computing; Software deployment; Computation; Load management; Smart grid; Set (abstract data type); Electricity meter; Distributed computing; Electrical engineering; Engineering; Power (physics); Algorithm","score_opus":0.061942395581318935,"score_gpt":0.2483812222684498,"score_spread":0.18643882668713085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993328790","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057907257,0.0001922538,0.92314786,0.000009812849,0.0075612203,0.00030490366,0.00003151792,0.0004886424,0.010356552],"genre_scores_gemma":[0.99688894,0.0000081574335,0.0019418027,0.000026115707,0.00003876886,0.00009273708,0.000007605128,0.00007507387,0.00092081894],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846727,0.000069252535,0.00034362555,0.00029442116,0.00047665802,0.000348786],"domain_scores_gemma":[0.99921966,0.000023315102,0.000040571333,0.00044297913,0.00007418103,0.00019930684],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028719901,0.00027285362,0.0002589397,0.00022548011,0.00012624117,0.00007447963,0.00016831841,0.00012210188,0.000023538865],"category_scores_gemma":[0.0000012005851,0.00028949263,0.00011884136,0.0002815354,0.000027151473,0.00021733357,0.0000022282975,0.00015860947,0.00019925265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002220042,0.000059113114,0.000012224827,0.000051873085,0.00018870227,0.000006279286,0.0003955898,0.9937797,0.0028468587,0.000022137294,0.0025378142,0.00007749234],"study_design_scores_gemma":[0.0011475378,0.00011560501,0.00007274681,0.000096570024,0.00015675042,0.00013092652,0.00056100264,0.96063405,0.017458457,0.0000041442054,0.018917713,0.00070451567],"about_ca_topic_score_codex":0.0002889592,"about_ca_topic_score_gemma":0.00004367696,"teacher_disagreement_score":0.93898165,"about_ca_system_score_codex":0.0014839623,"about_ca_system_score_gemma":0.0000308904,"threshold_uncertainty_score":0.9999557},"labels":[],"label_agreement":null},{"id":"W1998868978","doi":"10.1109/tpwrs.2011.2166411","title":"Criticality Assessment of Distribution Feeder Sections","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Criticality; Reliability engineering; Ranking (information retrieval); Probabilistic logic; Section (typography); Reliability (semiconductor); Distribution (mathematics); Asset (computer security); Investment (military); Failure mode, effects, and criticality analysis; Asset management; Computer science; Engineering; Operations research; Mathematics; Economics; Power (physics)","score_opus":0.019932311676943256,"score_gpt":0.23667284384180012,"score_spread":0.21674053216485686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998868978","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01444294,0.00005995248,0.9637531,0.000014937491,0.0051709297,0.00032604425,0.00032668278,0.000314678,0.015590701],"genre_scores_gemma":[0.9994864,0.000014352854,0.00015228482,0.000007281828,0.000008619854,0.00011751313,0.0000042690535,0.000022125778,0.00018719424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987644,0.000081503866,0.00047288233,0.00020254399,0.00022051639,0.00025814128],"domain_scores_gemma":[0.99923176,0.000058918315,0.00004038111,0.00042779432,0.00013362631,0.00010751716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002951646,0.0001689295,0.00027591965,0.00007085213,0.0000919086,0.000019202082,0.00012737696,0.0001334911,0.0001035663],"category_scores_gemma":[0.0000046869327,0.00016272296,0.00014578823,0.00022458077,0.000074951604,0.00015224623,6.874463e-7,0.00023008583,0.000036488993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045119366,0.012170742,0.0029392063,0.0125475805,0.0045107985,0.00011335562,0.01545499,0.7056472,0.043779995,0.16846955,0.0314492,0.0024662258],"study_design_scores_gemma":[0.0073864306,0.00411483,0.07579664,0.0047221547,0.0012966552,0.0007944737,0.011457768,0.4507955,0.32677546,0.0017117718,0.10871676,0.006431549],"about_ca_topic_score_codex":0.00023942869,"about_ca_topic_score_gemma":0.000031613123,"teacher_disagreement_score":0.9850434,"about_ca_system_score_codex":0.0001928457,"about_ca_system_score_gemma":0.00003129361,"threshold_uncertainty_score":0.66356504},"labels":[],"label_agreement":null},{"id":"W1999912552","doi":"10.1109/tpwrs.2011.2120633","title":"Incorporating Wind Power in Generating Capacity Reliability Evaluation Using Different Models","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Autoregressive–moving-average model; Autoregressive model; Monte Carlo method; Electric power system; Markov chain; Time series; Series (stratigraphy); Moving average; Computer science; Reliability engineering; Meteorology; Power (physics); Engineering; Statistics; Mathematics","score_opus":0.061479420387323756,"score_gpt":0.23399217724949523,"score_spread":0.17251275686217146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999912552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49676317,0.00008067834,0.49808893,0.0000024657502,0.0026995346,0.0006528689,0.00002376458,0.00016037622,0.0015282016],"genre_scores_gemma":[0.99861187,0.0000044124263,0.0011374592,0.000012858407,0.000016072878,0.00013135144,0.0000016911633,0.000058654696,0.000025651429],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971756,0.00037322412,0.0009460818,0.00050982524,0.00052903173,0.00046624654],"domain_scores_gemma":[0.9987628,0.0000793332,0.00013621288,0.00068248564,0.00019907196,0.00014010837],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014559715,0.00037874596,0.00048872863,0.0002464476,0.00016189572,0.000063353895,0.0002112916,0.0002555353,0.000055803615],"category_scores_gemma":[0.000018819312,0.00036035222,0.00014754107,0.00034708294,0.000067979425,0.0005688987,0.0000023846783,0.00048811652,0.00001825099],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021888323,0.00016705,0.00019448926,0.00014721935,0.00003740857,0.000003467304,0.003396311,0.9901988,0.005588723,0.00012253331,0.0000129604505,0.00010913105],"study_design_scores_gemma":[0.0005275244,0.00008088652,0.00033508748,0.00038821253,0.000033884786,0.000021524122,0.000589552,0.99245507,0.0049129543,0.0002369759,0.000015157238,0.00040317167],"about_ca_topic_score_codex":0.0008339686,"about_ca_topic_score_gemma":0.00026822646,"teacher_disagreement_score":0.5018487,"about_ca_system_score_codex":0.00091439835,"about_ca_system_score_gemma":0.00006204808,"threshold_uncertainty_score":0.99988484},"labels":[],"label_agreement":null},{"id":"W2001707354","doi":"10.1109/tpwrs.2013.2287291","title":"Novel Comprehensive Control Framework for Incorporating VSCs to Smart Power Grids Using Bidirectional Synchronous-VSC","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":130,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Control theory (sociology); Controller (irrigation); Voltage source; Voltage controller; Converters; Synchronization (alternating current); Voltage regulation; Automatic frequency control; Voltage regulator; Computer science; Voltage; Interfacing; Electric power system; Engineering; Electronic engineering; Power (physics); Voltage droop; Topology (electrical circuits); Electrical engineering; Control (management); Physics","score_opus":0.013214514808526466,"score_gpt":0.2225039839402849,"score_spread":0.20928946913175842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2001707354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014179951,0.00026904835,0.9770284,0.00009551914,0.0064071068,0.0013063605,0.00017482249,0.0004074107,0.00013137815],"genre_scores_gemma":[0.9768108,0.000006243991,0.022166176,0.00020271106,0.00010089121,0.00054175645,0.000006531756,0.00009203116,0.00007281965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985144,0.00003666015,0.0005073107,0.00032603537,0.00022324568,0.00039233908],"domain_scores_gemma":[0.9988691,0.0002486644,0.00008832881,0.00028659787,0.00032899788,0.00017826544],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001074162,0.00031946003,0.00040122948,0.0002519187,0.0002496461,0.00018574388,0.00013841502,0.00022692353,0.00010588283],"category_scores_gemma":[0.000008533102,0.00032891898,0.00017062102,0.00031607912,0.000027724398,0.00026858714,0.0000010795488,0.0002656727,0.000114513925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035044413,0.00007061831,0.000014020084,0.000058006302,0.00019853443,6.933284e-7,0.0002462378,0.97258115,0.025868298,0.000111011475,0.0003835375,0.00043283007],"study_design_scores_gemma":[0.0012722675,0.00021577819,0.00010717086,0.0002591844,0.00007624202,0.000047367288,0.00039066953,0.992605,0.0016421449,0.000035588633,0.0028066274,0.00054197625],"about_ca_topic_score_codex":0.00023982846,"about_ca_topic_score_gemma":0.000017467375,"teacher_disagreement_score":0.96263087,"about_ca_system_score_codex":0.00024524788,"about_ca_system_score_gemma":0.00004384205,"threshold_uncertainty_score":0.9999163},"labels":[],"label_agreement":null},{"id":"W2004531005","doi":"10.1109/tpwrs.2002.1008372","title":"Closure to discussion of \"z-bus loss allocation\"","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Closure (psychology); Computer science; Operations research; Engineering; Economics","score_opus":0.009031565387675721,"score_gpt":0.19659365069461435,"score_spread":0.18756208530693863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004531005","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005099495,0.00025181094,0.9861848,0.00015659144,0.0033467093,0.0005767512,0.00003724217,0.00038609226,0.0039605475],"genre_scores_gemma":[0.99677914,0.000041098687,0.00023103741,0.000018650471,0.000018130846,0.00010915731,0.000002141805,0.0000606883,0.002739942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858385,0.000063016676,0.0005065042,0.00023047387,0.00034995255,0.00026619362],"domain_scores_gemma":[0.9991976,0.000041781932,0.000060942777,0.00046217747,0.000103161154,0.00013436002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014028931,0.00021246483,0.00028511873,0.0003286111,0.00007241888,0.000034598103,0.00018633826,0.00014383746,0.00014135409],"category_scores_gemma":[0.000004139966,0.00017225703,0.0000973094,0.00073096144,0.000016034835,0.00016827672,5.9094083e-7,0.00015854089,0.00031709223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001075813,0.00011575015,0.000035631143,0.00014625666,0.000090234884,0.0000037928146,0.0013294369,0.9893051,0.0033405484,0.0000760355,0.0048880028,0.00065848697],"study_design_scores_gemma":[0.0026811047,0.0012262487,0.00034791423,0.0016929882,0.00022682453,0.0002498798,0.0008785091,0.8430889,0.09988401,0.000015423242,0.047581833,0.0021263373],"about_ca_topic_score_codex":0.000024485442,"about_ca_topic_score_gemma":0.000009720226,"teacher_disagreement_score":0.99167967,"about_ca_system_score_codex":0.00015691147,"about_ca_system_score_gemma":0.000009266356,"threshold_uncertainty_score":0.7024438},"labels":[],"label_agreement":null},{"id":"W2004651383","doi":"10.1109/tpwrs.2014.2314717","title":"Co-Ordinated PSS Tuning of Large Power Systems by Combining Transfer Function-Eigenfunction Analysis (TFEA), Optimization, and Eigenvalue Sensitivity","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Eigenfunction; Transfer function; Eigenvalues and eigenvectors; Sensitivity (control systems); Computation; Electric power system; Control theory (sociology); Mathematical optimization; Mathematics; Function (biology); Power (physics); Computer science; Applied mathematics; Engineering; Algorithm; Electronic engineering; Physics","score_opus":0.005972350107007294,"score_gpt":0.20387774252063892,"score_spread":0.19790539241363161,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004651383","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016877709,0.00034989807,0.9760625,0.000010884977,0.0030664771,0.00066816714,0.00046834903,0.00056388095,0.0019321396],"genre_scores_gemma":[0.9992995,0.000033951575,0.00008989376,0.000021466363,0.000006611661,0.00007854755,0.00009090607,0.00008545951,0.000293625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967061,0.0006806273,0.0010562943,0.00057740824,0.0005039293,0.00047559888],"domain_scores_gemma":[0.99837804,0.0002694887,0.00014106979,0.0006193325,0.00034349412,0.0002485538],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014545696,0.00047124785,0.00094453123,0.0006468034,0.00036143785,0.00015442888,0.00011507778,0.00035044097,0.00016098768],"category_scores_gemma":[0.000014759289,0.0004935025,0.00027032854,0.001242715,0.00007778898,0.00040544354,0.0000013418266,0.0003314997,0.000016616556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056009794,0.00015756681,0.00052879273,0.00021751315,0.0010447346,0.0000011977569,0.0007567377,0.99472815,0.0019393954,0.00022985411,0.00032325272,0.000016776752],"study_design_scores_gemma":[0.0011521034,0.00020072909,0.0002244739,0.000110795634,0.00054830365,0.0000176371,0.0010143336,0.9929727,0.001289881,9.182973e-7,0.0019566084,0.0005115193],"about_ca_topic_score_codex":0.00017733216,"about_ca_topic_score_gemma":0.00004765212,"teacher_disagreement_score":0.9824218,"about_ca_system_score_codex":0.00017339305,"about_ca_system_score_gemma":0.000031283063,"threshold_uncertainty_score":0.9997517},"labels":[],"label_agreement":null},{"id":"W2004675218","doi":"10.1109/tpwrs.2015.2400633","title":"Local and Wide-Area PMU-Based Decentralized Dynamic State Estimation in Multi-Machine Power Systems","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":247,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Phasor measurement unit; Electric power system; Phasor; Control theory (sociology); Extended Kalman filter; Context (archaeology); Synchronous motor; Permanent magnet synchronous generator; AC power; Control engineering; Rotor (electric); Computer science; Kalman filter; Fault (geology); Engineering; Synchronization (alternating current); Power (physics); Voltage; Control (management)","score_opus":0.016319388959981505,"score_gpt":0.2386965375682077,"score_spread":0.2223771486082262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004675218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070231594,0.0012632619,0.9863536,0.00003545708,0.0032231344,0.0010612432,0.0002023977,0.0005293329,0.0003084482],"genre_scores_gemma":[0.998947,0.000024667252,0.0005433168,0.000021295453,8.2308794e-8,0.00016935883,0.000022080087,0.00007300836,0.00019914735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976214,0.00027249884,0.0008383162,0.00041559743,0.00040755034,0.00044461762],"domain_scores_gemma":[0.9987938,0.00014487501,0.00009766697,0.0004728306,0.00014031051,0.00035051187],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00063121156,0.0003945734,0.0005517567,0.0003746268,0.000081980346,0.00016170462,0.00015269576,0.00019810272,0.000027593138],"category_scores_gemma":[0.000019473442,0.0003861547,0.00008545535,0.00043450677,0.00007352975,0.00032054537,0.0000014137352,0.00030093192,0.00005103942],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008182369,0.00014805804,0.00022642208,0.00018413518,0.000052129995,0.00001296856,0.00092270406,0.99820936,0.000054974433,0.000009254195,0.00008290089,0.000015279751],"study_design_scores_gemma":[0.0024781309,0.00008795633,0.00023981603,0.00024158462,0.000023927765,0.000025818159,0.0005354095,0.99510956,0.0001257896,0.000001754072,0.00074904173,0.00038120666],"about_ca_topic_score_codex":0.0005742859,"about_ca_topic_score_gemma":0.0005695418,"teacher_disagreement_score":0.99192387,"about_ca_system_score_codex":0.0006025462,"about_ca_system_score_gemma":0.000089793335,"threshold_uncertainty_score":0.99985904},"labels":[{"model":"gemma","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":[],"domain":null,"study_design":"simulation_or_modeling","genre":"methods","about_ca_system":false,"about_ca_topic":false,"confidence":"low"}],"label_agreement":"agree"},{"id":"W2005914635","doi":"10.1109/tpwrs.2013.2283542","title":"Accuracies of Optimal Transmission Switching Heuristics Based on DCOPF and ACOPF","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":123,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Heuristic; Mathematical optimization; Computer science; Computation; Linear programming; Electric power system; Electric power transmission; Power (physics); Algorithm; Mathematics; Engineering","score_opus":0.006830730744772009,"score_gpt":0.2017587588535645,"score_spread":0.1949280281087925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005914635","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11838979,0.00015178938,0.8788237,0.00004595322,0.0010475907,0.0004189892,0.00010205192,0.00024342688,0.00077671785],"genre_scores_gemma":[0.99891603,0.000030116493,0.0008602747,0.00001555077,0.000010652612,0.00006130242,0.000006544585,0.00004689363,0.0000526229],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987511,0.000046148405,0.00041060577,0.00022792144,0.00029269105,0.00027152413],"domain_scores_gemma":[0.99929243,0.00014488318,0.000054417764,0.0002862062,0.00008077937,0.00014128901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012793583,0.00025911932,0.00029394298,0.00018453306,0.00010456977,0.00008073856,0.00012053429,0.0001585737,0.00010495121],"category_scores_gemma":[0.0000048292227,0.0002452226,0.000095800824,0.00018867865,0.000036434853,0.00023802884,6.021282e-7,0.00029156622,0.000065223816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054181804,0.00014434785,0.0000110661185,0.00035032353,0.00005894161,0.0000035575883,0.00048276875,0.959699,0.03506006,0.000029160197,0.00078701094,0.0033196022],"study_design_scores_gemma":[0.000703584,0.000415399,0.00023789999,0.00042241512,0.000050034494,0.000012561892,0.00030735516,0.9583909,0.037329122,0.0000056678878,0.0017602765,0.0003648143],"about_ca_topic_score_codex":0.000047926445,"about_ca_topic_score_gemma":0.0000012249586,"teacher_disagreement_score":0.88052624,"about_ca_system_score_codex":0.000086758126,"about_ca_system_score_gemma":0.000019480978,"threshold_uncertainty_score":0.99998873},"labels":[],"label_agreement":null},{"id":"W2006672684","doi":"10.1109/tpwrs.2012.2205714","title":"Probabilistic Load Flow Modeling Comparing Maximum Entropy and Gram-Charlier Probability Density Function Reconstructions","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Probabilistic logic; Probability density function; Monte Carlo method; Principle of maximum entropy; Grid; Mathematical optimization; Computer science; Entropy (arrow of time); Flow (mathematics); Algorithm; Applied mathematics; Mathematics; Statistics; Physics","score_opus":0.022213052834848902,"score_gpt":0.19743919047109978,"score_spread":0.1752261376362509,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006672684","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3898454,0.00030107683,0.6028214,0.0000062330246,0.005296979,0.00029255336,0.000015825193,0.0004228401,0.000997704],"genre_scores_gemma":[0.9987568,0.000024256939,0.0008919959,0.000008185178,0.00008492139,0.00010442679,0.0000044668395,0.00005238082,0.000072516625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833304,0.00007776607,0.00047929026,0.00032144118,0.00026353844,0.0005249404],"domain_scores_gemma":[0.9991713,0.00006547537,0.000051529038,0.00035393637,0.000108536755,0.00024921182],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00038331657,0.00031740527,0.00035283537,0.00013205645,0.00034116057,0.00010306935,0.00008270312,0.00017737078,0.000041239437],"category_scores_gemma":[0.000008775522,0.0003216769,0.000112354035,0.00021189339,0.00006495332,0.00046081096,0.0000021619776,0.00042571555,0.00004431818],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037778438,0.000089254965,0.0005945249,0.00020386344,0.0001138702,8.4358265e-7,0.0006754836,0.9958877,0.0005947202,0.00031747797,0.000035528676,0.0014489804],"study_design_scores_gemma":[0.00047343684,0.00006581515,0.00014071196,0.00019489283,0.00012120564,0.00017218679,0.00023257812,0.99643266,0.0006882004,0.00030639063,0.00071410957,0.00045780116],"about_ca_topic_score_codex":0.00012209022,"about_ca_topic_score_gemma":0.000100706486,"teacher_disagreement_score":0.60891145,"about_ca_system_score_codex":0.00032451816,"about_ca_system_score_gemma":0.000028556115,"threshold_uncertainty_score":0.9999235},"labels":[],"label_agreement":null},{"id":"W2008867803","doi":"10.1109/59.919213","title":"Discussion of \"Radial basis function (RBF) network adaptive power system stabilizer\" [and reply]","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Radial basis function; Electric power system; Control theory (sociology); Stabilizer (aeronautics); Radial basis function network; Computer science; Function (biology); Basis (linear algebra); Artificial neural network; Control engineering; Power (physics); Engineering; Mathematics; Artificial intelligence; Physics; Control (management)","score_opus":0.007844990973043102,"score_gpt":0.18547183593677632,"score_spread":0.1776268449637332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2008867803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013922134,0.0005313036,0.95869,0.00003492029,0.005797509,0.0009433481,0.00017305282,0.0006969751,0.019210774],"genre_scores_gemma":[0.9980966,0.00004542181,0.00014675371,0.000017124585,0.00002149189,0.00011204066,0.0000041478374,0.00006739346,0.0014890153],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976127,0.00026842335,0.00088583987,0.00044803764,0.00039711435,0.00038785057],"domain_scores_gemma":[0.99883974,0.00011273938,0.000103819126,0.0006290601,0.000104705825,0.0002099367],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004882789,0.00035270964,0.0005736227,0.00015691177,0.00019909188,0.000060252965,0.00013437764,0.0002133242,0.00057609874],"category_scores_gemma":[0.0000032832074,0.00027585,0.00018868806,0.00046188582,0.0000763358,0.00028143884,0.0000012015846,0.00026034366,0.00007244634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042627275,0.00013517877,0.000091459035,0.00036874026,0.0002567417,0.0000044108397,0.0015744262,0.9935131,0.00019554362,0.00025927988,0.0017520728,0.0014227949],"study_design_scores_gemma":[0.005691809,0.0026463298,0.002258137,0.0031201604,0.00061414315,0.00026098528,0.012124511,0.8347467,0.0021207335,0.000027794782,0.13357243,0.002816226],"about_ca_topic_score_codex":0.000092592854,"about_ca_topic_score_gemma":0.00003284105,"teacher_disagreement_score":0.9841745,"about_ca_system_score_codex":0.00026668096,"about_ca_system_score_gemma":0.000036826044,"threshold_uncertainty_score":0.99996936},"labels":[],"label_agreement":null},{"id":"W2017116792","doi":"10.1109/tpwrs.2014.2348531","title":"Load Modeling For Power System Requirement and Capability Assessment","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Parks Canada","funders":"Office of Naval Research; Grainger Foundation","keywords":"Electric power system; Computation; Computer science; Power (physics); Reliability engineering; Control engineering; Power-flow study; Mathematical optimization; Engineering; Algorithm; Mathematics","score_opus":0.015561945687625166,"score_gpt":0.23877917500143123,"score_spread":0.22321722931380605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2017116792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011500924,0.0001350224,0.9751403,0.00003192765,0.004526365,0.0012038843,0.0000905994,0.000648231,0.0067227795],"genre_scores_gemma":[0.998318,0.0000059762206,0.0010294038,0.000016382677,0.000009905213,0.0004326835,0.0000027853112,0.000055765777,0.00012906978],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99795324,0.00014663671,0.00069644715,0.00044652523,0.00039330136,0.00036382454],"domain_scores_gemma":[0.9987945,0.00012499317,0.00006138643,0.0006064167,0.00021801259,0.00019468013],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012005579,0.0003041132,0.00045237574,0.0001088429,0.00021626889,0.0001292516,0.00013844171,0.00016316104,0.00002274846],"category_scores_gemma":[0.000008094623,0.00029271803,0.00013957481,0.00013513023,0.000032479216,0.00019288104,0.0000013213993,0.00017195512,0.000014836703],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026741076,0.00007829549,0.00002544477,0.0008201245,0.00009749277,4.5920856e-7,0.0005793109,0.99649745,0.00037156133,0.0012586854,0.00014743171,0.00009699587],"study_design_scores_gemma":[0.000710789,0.00014172362,0.000020043297,0.00016316673,0.000036205096,0.00001191815,0.0007242771,0.9949147,0.00022031576,0.000008455816,0.0027385014,0.00030990844],"about_ca_topic_score_codex":0.000060839982,"about_ca_topic_score_gemma":0.000030204163,"teacher_disagreement_score":0.9868171,"about_ca_system_score_codex":0.00076035754,"about_ca_system_score_gemma":0.000051268216,"threshold_uncertainty_score":0.9999525},"labels":[],"label_agreement":null},{"id":"W2024825567","doi":"10.1109/tpwrs.2012.2205022","title":"Adequacy Assessment Considerations in Wind Integrated Power Systems","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada); Manitoba Hydro; University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Electricity generation; Wind speed; Engineering; Electric power transmission; Range (aeronautics); Computer science; Power (physics); Electrical engineering; Meteorology; Aerospace engineering","score_opus":0.01429391360885355,"score_gpt":0.23757517683005044,"score_spread":0.2232812632211969,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024825567","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036886323,0.0018783815,0.92097515,0.000088790504,0.022524422,0.0015515574,0.00021489151,0.000745806,0.015134683],"genre_scores_gemma":[0.9986518,0.000029004206,0.000110369845,0.00004143178,0.000022702612,0.00031728097,0.0000059611134,0.000078479105,0.0007429671],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.997193,0.00028387125,0.00096944877,0.00035589503,0.000410976,0.00078681717],"domain_scores_gemma":[0.99852645,0.0002746509,0.0000926674,0.0006866875,0.00013303137,0.00028650215],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008365539,0.00042869328,0.00059897633,0.00040005572,0.00015667504,0.00017810805,0.00018144654,0.00030199523,0.00018018829],"category_scores_gemma":[0.000015185121,0.00040212835,0.00015742493,0.000484887,0.000066403925,0.00064346805,0.0000016164673,0.0006774895,0.00032520478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004693296,0.00138009,0.0016495944,0.0009069294,0.00059838034,0.00006782656,0.0068176086,0.95889026,0.0052911933,0.0115411915,0.012729308,0.00008068798],"study_design_scores_gemma":[0.013683467,0.0019532016,0.017636318,0.011144077,0.0006290909,0.0029224716,0.04518885,0.3951565,0.01148738,0.00022035342,0.48968226,0.010296022],"about_ca_topic_score_codex":0.00041926274,"about_ca_topic_score_gemma":0.00008080346,"teacher_disagreement_score":0.96176547,"about_ca_system_score_codex":0.0007592238,"about_ca_system_score_gemma":0.00010657584,"threshold_uncertainty_score":0.99984306},"labels":[],"label_agreement":null},{"id":"W2026821072","doi":"10.1109/tpwrs.2012.2183901","title":"Reliability Analysis of Phasor Measurement Unit Considering Data Uncertainty","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Phasor measurement unit; Reliability (semiconductor); Fuzzy logic; Sensitivity (control systems); Fuzzy set; Reliability engineering; Markov chain; Phasor; Markov process; Computer science; Markov model; Component (thermodynamics); Data mining; Electric power system; Engineering; Mathematics; Statistics; Power (physics); Machine learning; Artificial intelligence","score_opus":0.07294181051363545,"score_gpt":0.2708603609838081,"score_spread":0.19791855047017265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026821072","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01628369,0.00044511762,0.9769413,0.0000103949615,0.0029693616,0.00040696547,0.000529466,0.00028246525,0.0021312567],"genre_scores_gemma":[0.99960107,0.000016646423,0.0002354169,0.000008226144,0.0000054618276,0.00003964655,0.000019623378,0.000026537826,0.000047403046],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978661,0.00020276202,0.000739037,0.00029654242,0.0005586627,0.000336872],"domain_scores_gemma":[0.9977726,0.00013524131,0.00009483142,0.0015733143,0.00023625375,0.00018780728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016756218,0.00022653387,0.00055209454,0.0003288328,0.00008497228,0.000032886444,0.0003127201,0.00011552128,0.00024281572],"category_scores_gemma":[0.00003123029,0.00021523447,0.00016619258,0.0009567812,0.000054552496,0.0003581431,0.0000027500014,0.0001758556,0.000023363877],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017265755,0.00018912238,0.00066584646,0.00015533813,0.0010497066,3.2453408e-7,0.00062676606,0.99643344,0.00058361096,0.00002921921,0.00019401016,0.00005532674],"study_design_scores_gemma":[0.0006542516,0.00005276115,0.0022628575,0.00011846802,0.0013162749,0.000006545319,0.0010812711,0.97679496,0.002629903,0.0000014574514,0.014549289,0.00053199305],"about_ca_topic_score_codex":0.00022062969,"about_ca_topic_score_gemma":0.00013109263,"teacher_disagreement_score":0.9833174,"about_ca_system_score_codex":0.00023229695,"about_ca_system_score_gemma":0.000042005107,"threshold_uncertainty_score":0.8777007},"labels":[],"label_agreement":null},{"id":"W2028227024","doi":"10.1109/tpwrs.2013.2247640","title":"Damping Inter-Area Oscillations Based on a Model Predictive Control (MPC) HVDC Supplementary Controller","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":126,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Linear-quadratic-Gaussian control; Control theory (sociology); Model predictive control; Electric power system; Controller (irrigation); Optimal projection equations; Engineering; Optimal control; Control system; SIGNAL (programming language); Control engineering; Stability (learning theory); Power (physics); Control (management); Computer science; Mathematics; Mathematical optimization","score_opus":0.009783709632917153,"score_gpt":0.20259241815247905,"score_spread":0.1928087085195619,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028227024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050679324,0.000037216272,0.9854485,0.00013814769,0.0025685728,0.0025341578,0.0007949019,0.00051763415,0.0028929457],"genre_scores_gemma":[0.9971209,0.0000037519944,0.00012124119,0.00014080715,0.000046466175,0.0020523157,0.000013780664,0.0000816473,0.0004190957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808246,0.00011506052,0.00062672375,0.0003778141,0.0003727442,0.00042521645],"domain_scores_gemma":[0.99903,0.00015145686,0.00008443321,0.00041217438,0.00014253613,0.0001793973],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002314626,0.000368654,0.0004371308,0.00037426944,0.00025695073,0.00015076778,0.00015107276,0.00020097398,0.00034231617],"category_scores_gemma":[0.0000045898246,0.00034159666,0.00021224622,0.00022941988,0.00003313125,0.00028039614,6.7737176e-7,0.00039737817,0.00020240019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000695069,0.00009222967,0.000019852721,0.000054581247,0.00019203825,0.0000013988011,0.00032979017,0.9933242,0.0035094018,0.000021276304,0.002179367,0.00020633219],"study_design_scores_gemma":[0.0023410255,0.00030024574,0.000040539213,0.00025049952,0.000054666707,0.000008151028,0.0003814163,0.9940711,0.0005327552,0.000010374168,0.0016892635,0.00031991125],"about_ca_topic_score_codex":0.00055711204,"about_ca_topic_score_gemma":0.000055445016,"teacher_disagreement_score":0.992053,"about_ca_system_score_codex":0.00039034206,"about_ca_system_score_gemma":0.00003455189,"threshold_uncertainty_score":0.9999036},"labels":[],"label_agreement":null},{"id":"W2029666689","doi":"10.1109/tpwrs.2013.2284670","title":"An Autoground System for Anti-Islanding Protection of Distributed Generation","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Islanding Detection in Power Systems","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"Hydro-Québec; Aalborg Universitet","keywords":"Islanding; Recloser; Overcurrent; Distributed generation; Distributed power generation; Context (archaeology); Phasor; Controller (irrigation); Engineering; Reliability engineering; Scalability; Electric power system; Computer science; Control engineering; Electrical engineering; Circuit breaker; Power (physics); Voltage; Renewable energy","score_opus":0.01788524909295101,"score_gpt":0.2184892379988832,"score_spread":0.2006039889059322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029666689","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11419055,0.000046426005,0.870153,0.000005472763,0.01232169,0.0019613253,0.00021789421,0.0008932432,0.0002103953],"genre_scores_gemma":[0.99786776,0.0000024628148,0.00014857638,0.0000015779249,0.00011595119,0.0016398174,0.000025788022,0.00008522675,0.000112844464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982513,0.000104405706,0.00071030547,0.00031506096,0.00029172061,0.00032716867],"domain_scores_gemma":[0.99900854,0.000047041507,0.00015299235,0.0004617685,0.00022712894,0.000102510014],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031577365,0.0002781762,0.00040304902,0.00036568596,0.00024100921,0.00019286752,0.00015805142,0.00024145895,0.000024330682],"category_scores_gemma":[0.0000032762875,0.0002761995,0.00014607736,0.00037130987,0.000028038148,0.0004895263,4.4026393e-7,0.00018028263,0.00006495691],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025615434,0.00011218734,0.000031324344,0.0011622256,0.00027352173,0.0000012170383,0.00074614934,0.65984595,0.33609563,0.00021020937,0.0010842338,0.00041176204],"study_design_scores_gemma":[0.0007662724,0.00041474114,0.000082727565,0.00028225407,0.000056680587,0.00007712687,0.0008003708,0.86310965,0.13291018,0.000003290661,0.0010965843,0.0004001625],"about_ca_topic_score_codex":0.00028443278,"about_ca_topic_score_gemma":0.000016747817,"teacher_disagreement_score":0.8836772,"about_ca_system_score_codex":0.00037901712,"about_ca_system_score_gemma":0.000018694642,"threshold_uncertainty_score":0.999969},"labels":[],"label_agreement":null},{"id":"W2033205122","doi":"10.1109/tpwrs.2011.2164425","title":"Effects of Load Sector Demand Side Management Applications in Generating Capacity Adequacy Assessment","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Load management; Reliability engineering; Demand side; Reliability (semiconductor); Electric power system; Environmental economics; Investment (military); Load shifting; Electric power; Risk analysis (engineering); Electric power industry; Energy management; Computer science; Business; Engineering; Power (physics); Economics; Electricity; Energy (signal processing); Electrical engineering","score_opus":0.012901990610136877,"score_gpt":0.20824593145311168,"score_spread":0.1953439408429748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2033205122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08410209,0.00024558746,0.9064895,0.0000020099465,0.0013640432,0.0012595225,0.00002165723,0.0001633289,0.0063522873],"genre_scores_gemma":[0.99726176,0.000037183894,0.001615844,0.000007091914,0.000008631457,0.00089942565,7.268645e-7,0.00003059513,0.00013870982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99858266,0.00009392815,0.0005267936,0.00026639862,0.00025028098,0.00027992594],"domain_scores_gemma":[0.99929035,0.00009749251,0.000072598436,0.00040142922,0.000056269902,0.00008188369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003208128,0.00021324246,0.00033059652,0.00016080249,0.000064456486,0.00001848888,0.00017574262,0.00010457178,0.0000144590895],"category_scores_gemma":[0.0000019307436,0.00020621359,0.00010115788,0.0002771545,0.000035103134,0.0001288422,0.0000014532596,0.00021055124,0.000018820725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010225432,0.003243919,0.0010674491,0.023235325,0.0016048179,0.00009283892,0.019211575,0.836679,0.10275847,0.008518777,0.00055642094,0.0029291552],"study_design_scores_gemma":[0.009688556,0.0012714494,0.02816099,0.0077553205,0.0008129622,0.00011091854,0.006311196,0.3490522,0.5790126,0.00043348715,0.013077698,0.004312646],"about_ca_topic_score_codex":0.0003339725,"about_ca_topic_score_gemma":0.00014138041,"teacher_disagreement_score":0.9131597,"about_ca_system_score_codex":0.00034475577,"about_ca_system_score_gemma":0.000023156017,"threshold_uncertainty_score":0.84091467},"labels":[],"label_agreement":null},{"id":"W2035746375","doi":"10.1109/tpwrs.2012.2186468","title":"Development of a FPGA Based Real-Time Power Analysis and Control for Distributed Generation Interface","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Université du Québec à Trois-Rivières","keywords":"Field-programmable gate array; Harmonics; Computer science; Power electronics; Interface (matter); Electronic engineering; Distributed generation; Electric power system; Power (physics); Engineering; Electrical engineering; Renewable energy; Voltage; Embedded system","score_opus":0.008259627304085809,"score_gpt":0.2073425437235125,"score_spread":0.1990829164194267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2035746375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027870603,0.0002515652,0.9705777,0.000009492696,0.000494717,0.00041094492,0.00025413698,0.000095912175,0.00003489792],"genre_scores_gemma":[0.9958244,0.000008040691,0.0039242157,0.0000051917436,0.000010458087,0.00013083532,0.000040143754,0.000019815276,0.000036889673],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921817,0.000030303549,0.0003498368,0.00011961952,0.000100463825,0.00018162285],"domain_scores_gemma":[0.99959654,0.000050147606,0.000059041482,0.00014091935,0.000079391575,0.000073985764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019952435,0.00013822036,0.00027214558,0.0001857151,0.00006838336,0.00002831718,0.000043575423,0.000080896716,0.000044699056],"category_scores_gemma":[0.0000019089257,0.00013194628,0.000089595735,0.00022365642,0.000011042409,0.00011293893,2.417302e-7,0.000046311154,0.000005985829],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005774767,0.00008333241,0.000026666068,0.000053926808,0.00078062766,8.735201e-8,0.00055742357,0.8735676,0.1242365,0.000004835163,0.000117406154,0.00051385956],"study_design_scores_gemma":[0.0010676482,0.00004353116,0.00017351715,0.000023524124,0.00036109026,0.0000010754824,0.000058978818,0.92234147,0.0745265,1.4582253e-7,0.0012212779,0.0001812404],"about_ca_topic_score_codex":0.000011844576,"about_ca_topic_score_gemma":0.000014935332,"teacher_disagreement_score":0.9679538,"about_ca_system_score_codex":0.00007435295,"about_ca_system_score_gemma":0.000015700947,"threshold_uncertainty_score":0.5380613},"labels":[],"label_agreement":null},{"id":"W2037982552","doi":"10.1109/59.852155","title":"State extension for adequacy evaluation of composite power systems-applications","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electric power system; Extension (predicate logic); State (computer science); Reliability (semiconductor); Reliability engineering; Computation; Computer science; Transmission system; Extension method; Mathematical optimization; Power (physics); Algorithm; Mathematics; Transmission (telecommunications); Engineering; Telecommunications","score_opus":0.018070665832006234,"score_gpt":0.25071264130582105,"score_spread":0.23264197547381482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037982552","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035161156,0.0014352856,0.952416,0.00002277487,0.0029627085,0.0035039976,0.0004632527,0.00037184483,0.003662995],"genre_scores_gemma":[0.99672335,0.000073294665,0.00013221879,0.0000121697385,0.000013011737,0.0017343597,0.000012217279,0.00006658211,0.0012328012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975961,0.00017699065,0.0008566791,0.00039776144,0.0005992906,0.00037320715],"domain_scores_gemma":[0.9982684,0.00017768922,0.00011907438,0.00077691744,0.0005292293,0.00012866607],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010965886,0.0002909317,0.00049839704,0.00019665377,0.00015636535,0.00006468188,0.00022376541,0.00015987059,0.00010994454],"category_scores_gemma":[0.0000052168616,0.00028596303,0.00021428066,0.00033110252,0.000055489603,0.00023783663,7.057909e-7,0.00017799356,0.00015916409],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010461311,0.0001942092,0.0000028117565,0.00058581337,0.0001683376,6.8206134e-7,0.0005529032,0.9868235,0.008213749,0.0001759104,0.0009833347,0.0021941492],"study_design_scores_gemma":[0.004486827,0.0006964015,0.00040753454,0.001983725,0.00060960505,0.00012495813,0.0009339733,0.7712117,0.024815539,0.00015415279,0.1930971,0.0014785243],"about_ca_topic_score_codex":0.000087561355,"about_ca_topic_score_gemma":0.000013480545,"teacher_disagreement_score":0.9615622,"about_ca_system_score_codex":0.0002615192,"about_ca_system_score_gemma":0.000059250477,"threshold_uncertainty_score":0.99995923},"labels":[],"label_agreement":null},{"id":"W2038417474","doi":"10.1109/tpwrs.2012.2200049","title":"Optimal Placement and Sizing Method to Improve the Voltage Stability Margin in a Distribution System Using Distributed Generation","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":486,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sizing; Distributed generation; Voltage; Margin (machine learning); Integer programming; Probabilistic logic; Engineering; Control theory (sociology); Electric power system; Linear programming; Voltage regulation; Computer science; Mathematical optimization; Renewable energy; Power (physics); Mathematics; Electrical engineering","score_opus":0.02120393418515787,"score_gpt":0.2514177080611188,"score_spread":0.23021377387596093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038417474","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3100133,0.00016477262,0.6858304,0.000017057971,0.0017819545,0.0009018289,0.0011077485,0.00016047597,0.000022426944],"genre_scores_gemma":[0.99839395,0.000003038208,0.0011553894,0.000007012497,0.000056484918,0.00025173984,0.000088967485,0.00003671348,0.0000067243504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99801576,0.00022530362,0.0005606539,0.00032374088,0.00032278185,0.0005517775],"domain_scores_gemma":[0.99918544,0.0001062315,0.00006601763,0.00037521095,0.00007496502,0.00019213103],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001378708,0.0003017864,0.00030670082,0.00009845688,0.00022136688,0.00015135863,0.00012342195,0.00015752419,0.000010117455],"category_scores_gemma":[0.0000102359845,0.00026775346,0.00007541898,0.00044073764,0.000027733078,0.00038671956,0.0000043743785,0.00030893236,0.00001657983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059170972,0.00010274426,0.00013972468,0.00018222013,0.00006118437,0.0000018514016,0.00075733836,0.92497206,0.07323207,0.00013398512,0.00009405873,0.00026358062],"study_design_scores_gemma":[0.00054906175,0.0001086398,0.00051634194,0.0001253656,0.000071056376,0.000035856807,0.0021185428,0.9519432,0.043302126,2.333108e-7,0.0008529227,0.0003766304],"about_ca_topic_score_codex":0.00018115695,"about_ca_topic_score_gemma":0.000025126468,"teacher_disagreement_score":0.6883806,"about_ca_system_score_codex":0.0016216913,"about_ca_system_score_gemma":0.000025230578,"threshold_uncertainty_score":0.99997747},"labels":[],"label_agreement":null},{"id":"W2039188563","doi":"10.1109/tpwrs.2012.2212467","title":"PEVs modeling and impacts mitigation in distribution networks","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":144,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Distributed generation; Integer programming; Computer science; Plug-in; Genetic algorithm; Mathematical optimization; Automotive engineering; Engineering; Renewable energy; Electrical engineering","score_opus":0.0053682669328080175,"score_gpt":0.19307896555684279,"score_spread":0.18771069862403478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039188563","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29010198,0.00082146755,0.7079013,0.000007483396,0.00081281736,0.00011293542,0.000013510641,0.000082359744,0.00014614737],"genre_scores_gemma":[0.99976647,0.00011281862,0.000021503334,0.000008756255,0.00003389546,0.000018326999,0.00000797043,0.000018560275,0.000011712261],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993392,0.000021565127,0.00019121049,0.00008557931,0.000089261695,0.0002731663],"domain_scores_gemma":[0.9997604,0.000017754868,0.00001615538,0.000096088064,0.000016409522,0.0000931974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011687824,0.0001154996,0.00011891013,0.00006363528,0.000054821172,0.000035507135,0.000032684595,0.0001234374,0.000009385754],"category_scores_gemma":[9.4734213e-7,0.00011230308,0.000028065417,0.00018585629,0.000007443253,0.00027541077,2.3464897e-7,0.00023115663,0.0000046908085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005192797,0.0000123770515,0.00019104882,0.000023205039,0.000013818229,4.3228425e-7,0.0002269119,0.99797964,0.0005403798,0.000074371856,0.00010707013,0.0008255759],"study_design_scores_gemma":[0.00018991335,0.00002455094,0.0008521373,0.000063307045,0.00000940955,0.000023717605,0.00009027965,0.99784815,0.000631587,0.0000063358316,0.00013388043,0.00012673931],"about_ca_topic_score_codex":0.00004827004,"about_ca_topic_score_gemma":0.000009853507,"teacher_disagreement_score":0.70966446,"about_ca_system_score_codex":0.00012433225,"about_ca_system_score_gemma":0.0000052162977,"threshold_uncertainty_score":0.45795867},"labels":[],"label_agreement":null},{"id":"W2043006350","doi":"10.1109/tpwrs.2004.826706","title":"Discussion of “New Models for Integrated Short-Term Forward Electricity Markets”","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Term (time); Electricity; Electricity market; Electric power system; Computer science; Mathematical economics; Electricity system; Economics; Electricity generation; Operations research; Engineering; Electrical engineering; Power (physics); Physics","score_opus":0.01252078679795736,"score_gpt":0.2236188163585204,"score_spread":0.21109802956056303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043006350","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045819064,0.00021245505,0.9902999,0.00003108085,0.002130168,0.0012241199,0.00009148938,0.00045490495,0.0009739807],"genre_scores_gemma":[0.9974507,0.000054145952,0.0012708352,0.00000592558,0.000018166731,0.00018271348,0.000014389484,0.00009121604,0.0009118745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99828285,0.000044135257,0.0006645751,0.00030185343,0.00031076217,0.00039579955],"domain_scores_gemma":[0.99917674,0.000058780115,0.00007744318,0.00039523863,0.00013790738,0.0001538918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023181789,0.00031000157,0.00045187224,0.00038884734,0.000087439315,0.000045744644,0.00021732916,0.00023164057,0.000013218025],"category_scores_gemma":[0.0000050914837,0.00024192635,0.00021239411,0.0006656497,0.000016876988,0.00032928577,6.301597e-7,0.00022097831,0.000008794512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010064817,0.00010031873,0.0000037601005,0.00018971255,0.00015264432,0.0000014010227,0.0004636631,0.9914718,0.005538823,0.00017524074,0.00064665615,0.0011553079],"study_design_scores_gemma":[0.0022095426,0.00059276057,0.000024637346,0.00079064805,0.00017198568,0.000055436274,0.0001858991,0.8809827,0.11296616,0.00027248016,0.0009880589,0.00075969455],"about_ca_topic_score_codex":0.000078819096,"about_ca_topic_score_gemma":0.000026311123,"teacher_disagreement_score":0.99286884,"about_ca_system_score_codex":0.0004546349,"about_ca_system_score_gemma":0.00011524001,"threshold_uncertainty_score":0.986547},"labels":[],"label_agreement":null},{"id":"W2043715401","doi":"10.1109/tpwrs.2013.2280659","title":"Integrating VSCs to Weak Grids by Nonlinear Power Damping Controller With Self-Synchronization Capability","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":143,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Control theory (sociology); Synchronizing; Controller (irrigation); Synchronization (alternating current); Electric power system; Open-loop controller; Nonlinear system; Automatic frequency control; Computer science; Power (physics); Engineering; Control engineering; Topology (electrical circuits); Physics; Control (management); Electrical engineering","score_opus":0.002836094960280476,"score_gpt":0.17360405076260588,"score_spread":0.1707679558023254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043715401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020001156,0.00022084874,0.97504807,0.00012324195,0.0012684609,0.0013049647,0.000064692365,0.00071717065,0.0012513689],"genre_scores_gemma":[0.9966524,0.000021208,0.0024979673,0.0000970754,0.000033004933,0.0003592922,0.000012713426,0.0000789469,0.0002473442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846596,0.00006996153,0.00047729356,0.00034838586,0.00026336964,0.00037500673],"domain_scores_gemma":[0.99912226,0.00006860392,0.00006251231,0.00032545012,0.0002459574,0.00017519077],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016565039,0.0003237273,0.00036016927,0.00015352105,0.00017074033,0.00021769197,0.00015139482,0.00015519901,0.00018308431],"category_scores_gemma":[0.000005791946,0.00027242486,0.00008070982,0.00038685594,0.00002199589,0.00038043872,9.809894e-7,0.0002747534,0.00020009141],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003975454,0.00014214977,0.00005221412,0.00007972533,0.00021380027,8.6057867e-7,0.001232753,0.98691803,0.0072049377,0.000012038531,0.0030516481,0.0010521008],"study_design_scores_gemma":[0.0013221176,0.00028303903,0.000041617,0.00016482963,0.00005536737,0.000015833784,0.0006460168,0.9859575,0.0020773816,0.0000013252491,0.00893737,0.00049758103],"about_ca_topic_score_codex":0.00022314509,"about_ca_topic_score_gemma":0.00006197446,"teacher_disagreement_score":0.9766513,"about_ca_system_score_codex":0.0003037799,"about_ca_system_score_gemma":0.000032898133,"threshold_uncertainty_score":0.9999728},"labels":[],"label_agreement":null},{"id":"W2044702745","doi":"10.1109/tpwrs.2012.2193490","title":"Long-Term Market Equilibrium Model With Strategic, Competitive, and Inflexible Generation","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Term (time); Generator (circuit theory); Electricity; Electricity market; Reliability (semiconductor); Economics; Electricity generation; Computer science; Microeconomics; Industrial organization; Mathematical optimization; Engineering; Mathematics; Power (physics); Thermodynamics; Physics","score_opus":0.02015164106900449,"score_gpt":0.21786168911202652,"score_spread":0.19771004804302203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044702745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.066060625,0.00073892594,0.91564614,0.000009848643,0.001259073,0.0004918363,0.00003260616,0.00038373773,0.015377231],"genre_scores_gemma":[0.9978663,0.000055445165,0.00042405867,0.000010803734,0.000041450778,0.00011548207,0.000009387417,0.00007224569,0.0014048332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987672,0.0000679236,0.00030780895,0.00021462832,0.00025221013,0.0003902053],"domain_scores_gemma":[0.9993973,0.000033750464,0.000054655506,0.00027627972,0.000070151844,0.00016790262],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019102065,0.00026378426,0.00024768428,0.00020187885,0.00008940487,0.00012226097,0.00008298668,0.00013662362,0.00005720313],"category_scores_gemma":[5.673048e-7,0.00024658316,0.000037099733,0.0002565901,0.000029524037,0.00061169366,7.3405937e-7,0.00018650509,0.000025392728],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034853005,0.000077960685,0.0002782594,0.00016983986,0.00012625306,0.000002788183,0.00032596578,0.99184567,0.0060894545,0.00063517946,0.000365143,0.000048663172],"study_design_scores_gemma":[0.00062767835,0.00014370316,0.00020509149,0.0001377106,0.00006135827,0.00013012,0.00007849599,0.99227536,0.0058270316,0.0000018278005,0.00009067928,0.00042096304],"about_ca_topic_score_codex":0.000011627391,"about_ca_topic_score_gemma":0.000017461423,"teacher_disagreement_score":0.9318057,"about_ca_system_score_codex":0.00014155649,"about_ca_system_score_gemma":0.000030770094,"threshold_uncertainty_score":0.9999986},"labels":[],"label_agreement":null},{"id":"W2050003741","doi":"10.1109/tpwrs.2014.2336753","title":"Online Adaptive Real-Time Optimal Dispatch of Privately Owned Energy Storage Systems Using Public-Domain Electricity Market Prices","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"","keywords":"Electricity market; Electricity; Revenue; Linear programming; Computer science; Economic dispatch; Energy storage; Mathematical optimization; Arbitrage; Economics; Operations research; Electric power system; Engineering; Finance; Algorithm; Mathematics","score_opus":0.011001363782216899,"score_gpt":0.20236840541635998,"score_spread":0.1913670416341431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050003741","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05720013,0.0002973157,0.9353867,0.0000116449255,0.0023415969,0.00074094435,0.00017882453,0.00069302705,0.003149824],"genre_scores_gemma":[0.9959378,0.00009232712,0.0028553472,0.000005869091,0.000070234186,0.00011160248,0.000021845095,0.00017365962,0.0007313013],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960548,0.00057665067,0.0012273663,0.00058471237,0.0007712751,0.0007851601],"domain_scores_gemma":[0.9978033,0.00033872086,0.00045190981,0.0007998202,0.000342066,0.00026423126],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008586318,0.0005861417,0.0009855874,0.0008147928,0.00019799358,0.00015924075,0.0004736563,0.00039296225,0.00004903731],"category_scores_gemma":[0.000017367769,0.00058020605,0.0002152839,0.0014736282,0.00005864728,0.00055108627,0.00000388542,0.00034631463,0.0000151197655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000110347515,0.00035503873,0.0000150742835,0.0002851252,0.00042608558,0.0000074332493,0.00028954755,0.97974205,0.017625298,0.00045906994,0.00055407494,0.00013088428],"study_design_scores_gemma":[0.00073339854,0.00041275923,0.00004406285,0.0003144894,0.000086088214,0.00007569211,0.0001627137,0.9926834,0.003558949,0.0000031390741,0.0013339008,0.000591389],"about_ca_topic_score_codex":0.00089038804,"about_ca_topic_score_gemma":0.000033933105,"teacher_disagreement_score":0.9387377,"about_ca_system_score_codex":0.0007305458,"about_ca_system_score_gemma":0.00011582367,"threshold_uncertainty_score":0.99966496},"labels":[],"label_agreement":null},{"id":"W2051556306","doi":"10.1109/tpwrs.2012.2235469","title":"Analysis of the Iberian Power Forward Price Formation","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Futures contract; Spot contract; Forward contract; Forward market; Common value auction; Maturity (psychological); Quarter (Canadian coin); Economics; Normal backwardation; Spot market; Financial economics; Futures market; Derivatives market; Business; Microeconomics; Electricity; Engineering","score_opus":0.004796734193670058,"score_gpt":0.1803990078667938,"score_spread":0.17560227367312375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051556306","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028925238,0.000097513795,0.9599285,0.00004029016,0.0024627894,0.00079697097,0.000035003734,0.00023209472,0.0074815615],"genre_scores_gemma":[0.9990279,0.000011900834,0.000078383266,0.000019516758,0.0000050850463,0.00017317238,0.0000035513092,0.000036030116,0.0006444259],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985233,0.00009254615,0.00058648025,0.00016789896,0.0003665801,0.00026318754],"domain_scores_gemma":[0.99896425,0.000067850124,0.0001426237,0.0005902823,0.00016243663,0.00007255546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018068247,0.00019716329,0.0003422013,0.0004983349,0.000100523954,0.000073038,0.00025168757,0.00013766429,0.0002080987],"category_scores_gemma":[0.000004392263,0.00015488085,0.00026220505,0.0019494838,0.000020858346,0.00045204253,9.349094e-7,0.0001638288,0.00010627116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004359243,0.00004636051,0.00007935266,0.00007498395,0.00082741346,2.5130063e-7,0.0011588975,0.9935847,0.002852377,0.00006414227,0.0011983066,0.000108889086],"study_design_scores_gemma":[0.00045443722,0.00010504382,0.0025245033,0.0001349026,0.0006790201,0.000018390738,0.000523145,0.9765517,0.016094746,0.0000057964694,0.0024692316,0.00043904784],"about_ca_topic_score_codex":0.000100181285,"about_ca_topic_score_gemma":0.000022905708,"teacher_disagreement_score":0.97010267,"about_ca_system_score_codex":0.00020260234,"about_ca_system_score_gemma":0.000018303108,"threshold_uncertainty_score":0.6315858},"labels":[],"label_agreement":null},{"id":"W2055908299","doi":"10.1109/tpwrs.2010.2047747","title":"Correction to “Framework for Assessing the Economic Efficiencies of Long-Run Network Pricing Models” [Feb 10 413-422","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Merger and Competition Analysis","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Operations research; Mathematical economics; Econometrics; Economics; Engineering","score_opus":0.026302897521164673,"score_gpt":0.2524384268225851,"score_spread":0.22613552930142045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055908299","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038888987,0.00013186083,0.9415881,0.00014992991,0.01352168,0.0003886602,0.0000553592,0.000048689057,0.0052267574],"genre_scores_gemma":[0.99618834,0.000014966109,0.00093989,0.000095530675,0.00011155113,0.00013261857,0.0000025405504,0.000029086073,0.0024854538],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985343,0.000030360883,0.0007252167,0.0003683802,0.000059402755,0.00028229403],"domain_scores_gemma":[0.99863905,0.00036543343,0.00034702665,0.0004963582,0.00006800882,0.00008414718],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008022264,0.00016935304,0.00041698647,0.00026691673,0.00037964276,0.00017969693,0.00025933312,0.000115588875,0.0004159852],"category_scores_gemma":[0.00002090051,0.00016067279,0.00029060536,0.00037955458,0.000045807134,0.00020403799,0.0000021425576,0.0002784916,0.00018434924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021363328,0.000066127875,0.00021649859,0.000024230549,0.000099635305,2.095101e-7,0.0004931765,0.9573156,0.0000494252,0.039971836,0.0014366977,0.0003051585],"study_design_scores_gemma":[0.00038919796,0.00019039196,0.0008312205,0.00018215827,0.00007952229,0.0000141123855,0.0009037756,0.97950464,0.0008918658,0.0045012976,0.011965562,0.0005462338],"about_ca_topic_score_codex":0.00038312085,"about_ca_topic_score_gemma":0.00022931161,"teacher_disagreement_score":0.95729935,"about_ca_system_score_codex":0.00012174839,"about_ca_system_score_gemma":0.000045088036,"threshold_uncertainty_score":0.6552046},"labels":[],"label_agreement":null},{"id":"W2061948033","doi":"10.1109/tpwrs.2012.2214447","title":"Probabilistic Power Flow by Monte Carlo Simulation With Latin Supercube Sampling","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":205,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Latin hypercube sampling; Monte Carlo method; Slice sampling; Bin; Sampling (signal processing); Probabilistic logic; Computer science; Histogram; Rejection sampling; Simple random sample; Monte Carlo integration; Importance sampling; Random variable; Algorithm; Mathematical optimization; Mathematics; Hybrid Monte Carlo; Statistics; Markov chain Monte Carlo; Artificial intelligence; Detector","score_opus":0.010757602155902733,"score_gpt":0.1990213242482729,"score_spread":0.18826372209237016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061948033","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16864547,0.00023571817,0.8251684,0.00004048373,0.0023880394,0.0013908851,0.00012709813,0.0006728775,0.0013310349],"genre_scores_gemma":[0.9982679,0.0000072861844,0.0002479136,0.000029268795,0.0000149113785,0.0004377665,0.0000034209913,0.00009095048,0.00090060144],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980987,0.00007666525,0.00054057344,0.0004174426,0.00037066857,0.00049595116],"domain_scores_gemma":[0.99876493,0.00020343022,0.00005218235,0.0005958945,0.00019568331,0.00018786565],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019792013,0.00037418102,0.0004109881,0.0001226085,0.00015264002,0.0001639036,0.00018827584,0.00019895808,0.00015124562],"category_scores_gemma":[0.0000100598245,0.00031637514,0.000113352595,0.0002859828,0.000058713686,0.00044545872,9.941808e-7,0.00033923646,0.0003028498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018382278,0.000069202324,0.000024564197,0.00017858569,0.000080750186,0.0000019061724,0.0007644628,0.9970159,0.0007569756,0.000015095656,0.00096886995,0.00010531382],"study_design_scores_gemma":[0.00065420294,0.00026346176,0.00019135588,0.00047182324,0.000045258508,0.000024516024,0.0005520788,0.987504,0.0004985889,0.000009597872,0.009150083,0.00063502917],"about_ca_topic_score_codex":0.0003760878,"about_ca_topic_score_gemma":0.00007194793,"teacher_disagreement_score":0.8296224,"about_ca_system_score_codex":0.00027636462,"about_ca_system_score_gemma":0.000028569686,"threshold_uncertainty_score":0.99992883},"labels":[],"label_agreement":null},{"id":"W2063268272","doi":"10.1109/tpwrs.2012.2197763","title":"Prediction of the Transient Stability Boundary Using the Lasso","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Manitoba Hydro","keywords":"Electric power system; Transient (computer programming); Boundary (topology); Stability (learning theory); Lasso (programming language); Control theory (sociology); Computer science; Feature selection; Variable (mathematics); Power (physics); Mathematical optimization; Engineering; Control engineering; Mathematics; Artificial intelligence; Machine learning; Physics","score_opus":0.031942519373412616,"score_gpt":0.21843492614376228,"score_spread":0.18649240677034967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063268272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13624285,0.0003579143,0.8511711,0.000031285712,0.009518243,0.000634885,0.00023795923,0.00016006484,0.0016457309],"genre_scores_gemma":[0.9998015,0.000007212937,0.00003594688,0.000011938838,0.000012890965,0.00004476275,9.0491767e-7,0.00002641913,0.000058416797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846876,0.00025882013,0.00049624563,0.00014033545,0.00036118616,0.00027465192],"domain_scores_gemma":[0.99903363,0.00008586162,0.000068526046,0.0006490692,0.00008088454,0.00008204148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066370104,0.00017108968,0.00021202597,0.000052021212,0.00025251973,0.000037690126,0.00019283105,0.00010826233,0.0000847943],"category_scores_gemma":[0.0000048728707,0.0001074549,0.00018334466,0.00034069904,0.00011049338,0.00022180044,9.71489e-7,0.00024200592,0.000007052679],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003987729,0.00040413692,0.0021691932,0.00039536564,0.00023798428,2.0468119e-7,0.010742891,0.9745456,0.010746443,0.000113265705,0.000523311,0.00008173911],"study_design_scores_gemma":[0.0018915305,0.00020872364,0.02247109,0.00054891047,0.00045798405,0.00014520518,0.00819757,0.83789045,0.071643904,0.000012256851,0.05555909,0.0009733122],"about_ca_topic_score_codex":0.000058380432,"about_ca_topic_score_gemma":0.000024103692,"teacher_disagreement_score":0.86355865,"about_ca_system_score_codex":0.00023178678,"about_ca_system_score_gemma":0.000041297168,"threshold_uncertainty_score":0.43818837},"labels":[],"label_agreement":null},{"id":"W2070925175","doi":"10.1109/tpwrs.2011.2166090","title":"Workforce Planning for Power Restoration: An Integrated Simulation-Optimization Approach","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Crew; Workforce; Duration (music); Electricity; Work (physics); Operations research; Electric power system; Operations management; Mains electricity; Workforce planning; Computer science; Power (physics); Reliability engineering; Engineering; Economics; Electrical engineering; Voltage; Aeronautics","score_opus":0.04503219538216347,"score_gpt":0.2498172247838406,"score_spread":0.20478502940167714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070925175","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014392547,0.00011364305,0.9852216,0.0000039990205,0.0037929064,0.001006455,0.00006740703,0.00074356893,0.007611118],"genre_scores_gemma":[0.9896601,0.000003809614,0.009265665,0.000020615109,0.000022134001,0.00036056363,0.000026990385,0.00007385406,0.00056629704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985146,0.00008401175,0.0005206762,0.00035095497,0.00020337806,0.00032639125],"domain_scores_gemma":[0.99898946,0.00008986723,0.00008158073,0.00049343024,0.00020848885,0.00013715975],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034111334,0.0002770972,0.00029327214,0.00019533694,0.00019106435,0.00008570487,0.00019327887,0.00023624531,0.0000472652],"category_scores_gemma":[0.000009827827,0.0002674587,0.00011022215,0.00033591694,0.000037411908,0.0005700004,5.358514e-7,0.00021363545,0.000016395195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000091084854,0.00010508634,0.0000072625476,0.00008036144,0.000048455116,0.0000010962967,0.0030660953,0.99600154,0.000045696976,0.000202992,0.00026024878,0.00009006086],"study_design_scores_gemma":[0.00041975672,0.00021794582,0.000011673478,0.00015809314,0.00002643312,0.0000098256305,0.0012698979,0.99154806,0.0003243593,0.000007752401,0.0056807613,0.000325469],"about_ca_topic_score_codex":0.00003142809,"about_ca_topic_score_gemma":0.0000050958065,"teacher_disagreement_score":0.9882208,"about_ca_system_score_codex":0.00017699895,"about_ca_system_score_gemma":0.00003340506,"threshold_uncertainty_score":0.99997777},"labels":[],"label_agreement":null},{"id":"W2071448107","doi":"10.1109/tpwrs.2005.861952","title":"Closure of “Definition and Classification of Power System Stability”","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Closure (psychology); Stability (learning theory); Electric power system; Power (physics); Computer science; Mathematical economics; Operations research; Engineering; Political science; Mathematics; Law; Physics; Machine learning","score_opus":0.016035686695191148,"score_gpt":0.19638426736728373,"score_spread":0.18034858067209258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071448107","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19828707,0.00029622245,0.78261733,0.000009614575,0.0014850594,0.00049118337,0.0002660186,0.00025260745,0.016294891],"genre_scores_gemma":[0.9997003,0.000008556184,0.0001510904,0.0000012625521,0.0000034018015,0.00005324491,0.000007412202,0.000029593342,0.000045157343],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836737,0.0001288308,0.0008217043,0.00023014231,0.0002874042,0.00016453453],"domain_scores_gemma":[0.9990732,0.00009609682,0.00015033963,0.00043004533,0.00019194835,0.000058338297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036215267,0.00018855801,0.0003921852,0.00018670899,0.00005394803,0.000023168164,0.00008768485,0.00017007274,0.000038413167],"category_scores_gemma":[0.0000032821122,0.0001875893,0.00010578174,0.0002919412,0.00007925339,0.00014684044,6.172623e-7,0.00012082237,0.000010377839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005624228,0.0024449658,0.014872519,0.01819088,0.00089557265,0.000010357932,0.0072955824,0.6838924,0.20018525,0.069330685,0.0020016043,0.00031776348],"study_design_scores_gemma":[0.011638787,0.002609637,0.1099439,0.0052591786,0.0008877071,0.0003769074,0.02897082,0.5497585,0.2767967,0.00028387638,0.008782587,0.004691412],"about_ca_topic_score_codex":0.00008091913,"about_ca_topic_score_gemma":0.00002898553,"teacher_disagreement_score":0.80141324,"about_ca_system_score_codex":0.00012657049,"about_ca_system_score_gemma":0.000023330489,"threshold_uncertainty_score":0.76496696},"labels":[],"label_agreement":null},{"id":"W2073064074","doi":"10.1109/tpwrs.2012.2233502","title":"Managing Uncertainty of Wind Energy With Wind Generators Cooperative","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Renewable energy; Wind power; Variable renewable energy; Electricity; Tariff; Economics; Sensitivity (control systems); Smoothing; Incentive; Environmental economics; Computer science; Electric power system; Econometrics; Engineering; Microeconomics; Power (physics); Electrical engineering","score_opus":0.004823537202650046,"score_gpt":0.17470068908952288,"score_spread":0.16987715188687283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073064074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025759807,0.0002732933,0.9667542,0.00002268845,0.0014189102,0.00047616742,0.0000222064,0.00026453967,0.005008215],"genre_scores_gemma":[0.9988047,0.000039514834,0.00018427685,0.000020456862,0.000017189166,0.00007710532,0.0000044836424,0.00007406723,0.0007782079],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99857825,0.00009086299,0.00044203008,0.00026270768,0.00030776992,0.0003183745],"domain_scores_gemma":[0.99916345,0.00005911739,0.00008425939,0.0003721619,0.00020749414,0.00011349569],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009984343,0.00028438552,0.00036238547,0.00029540618,0.00009891898,0.00007771915,0.00015649814,0.00012556001,0.000105852465],"category_scores_gemma":[0.0000011689386,0.0002456374,0.00006347361,0.0006288029,0.00004162939,0.00031095184,5.980519e-7,0.00016488285,0.000042987438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011300558,0.000038198676,0.000011669404,0.000060937607,0.00021348111,0.0000033281713,0.0004237627,0.99521327,0.0029785805,0.00013631122,0.00062844326,0.00028074472],"study_design_scores_gemma":[0.001297238,0.00058543525,0.000044279204,0.00046866992,0.000101715916,0.000085904,0.00091726356,0.9233101,0.07026166,0.000010061004,0.002072624,0.0008450288],"about_ca_topic_score_codex":0.00059203454,"about_ca_topic_score_gemma":0.000048914222,"teacher_disagreement_score":0.9730449,"about_ca_system_score_codex":0.0001879895,"about_ca_system_score_gemma":0.00004451392,"threshold_uncertainty_score":0.9999996},"labels":[],"label_agreement":null},{"id":"W2074673724","doi":"10.1109/tpwrs.2015.2393372","title":"Decentralized Supplementary Control of Multiple LCC-HVDC Links","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Controller (irrigation); Control theory (sociology); Automatic Generation Control; Decentralised system; Control engineering; Computer science; Control (management); Electric power system; Optimal control; Stability (learning theory); Noise (video); Engineering; Control system; Power (physics); Mathematical optimization; Mathematics","score_opus":0.015851127504622593,"score_gpt":0.22438137875124745,"score_spread":0.20853025124662486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2074673724","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029857129,0.00043036262,0.9614946,0.00003093732,0.006093401,0.0009117547,0.00042271902,0.00026290063,0.0004961712],"genre_scores_gemma":[0.99939513,0.000020059822,0.00012709516,0.000017709075,0.000032030894,0.00019086896,0.000007688043,0.000049577793,0.00015984102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985254,0.00009645529,0.00056844036,0.0001927734,0.00032177792,0.00029515495],"domain_scores_gemma":[0.99924046,0.000063026746,0.000072506315,0.0003271992,0.00010819036,0.00018862067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003130031,0.00021444816,0.00037340718,0.0001643523,0.000057387366,0.000032393076,0.00012671601,0.00023656423,0.00009277729],"category_scores_gemma":[0.0000045245324,0.00020595251,0.00013550272,0.00019707486,0.000025545593,0.00012110316,4.2461062e-7,0.0003031686,0.000072782976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040235583,0.0003939778,0.0005372321,0.0004869172,0.00083294895,0.000018851344,0.0029441514,0.94556147,0.04001298,0.00007595557,0.00711106,0.0016220768],"study_design_scores_gemma":[0.020575596,0.0012395967,0.00019535668,0.00068649405,0.00027892675,0.00017807985,0.0040458054,0.5709625,0.11228517,0.000019505813,0.28810084,0.0014321475],"about_ca_topic_score_codex":0.0009406508,"about_ca_topic_score_gemma":0.00013046208,"teacher_disagreement_score":0.969538,"about_ca_system_score_codex":0.00016475053,"about_ca_system_score_gemma":0.000029709765,"threshold_uncertainty_score":0.83984995},"labels":[],"label_agreement":null},{"id":"W2075079467","doi":"10.1109/tpwrs.2012.2226611","title":"Probabilistic Distribution Load Flow With Different Wind Turbine Models","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Probabilistic logic; Turbine; Wind power; Penetration (warfare); Reliability engineering; Control theory (sociology); Electric power system; Computer science; Voltage; Power flow; Probability distribution; Flow (mathematics); Engineering; Mathematical optimization; Mathematics; Power (physics); Electrical engineering; Mechanics; Aerospace engineering; Operations research; Artificial intelligence; Physics; Statistics","score_opus":0.011281604712790381,"score_gpt":0.19513312007973377,"score_spread":0.18385151536694339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2075079467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13399911,0.00029167318,0.8600915,0.000019249945,0.002833141,0.0006171482,0.00077759515,0.0005519748,0.0008185866],"genre_scores_gemma":[0.99940896,0.000012114933,0.000059433456,0.00000588998,0.000047352416,0.0001314364,0.00009930778,0.00006429388,0.0001711846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982507,0.00005146473,0.00036330655,0.00026012203,0.00048333342,0.00059106003],"domain_scores_gemma":[0.9990911,0.000045561053,0.00004571767,0.00043975413,0.00012097314,0.0002568771],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016016042,0.00037536718,0.00032599096,0.0000666925,0.00013001505,0.00007902658,0.000133592,0.00016864634,0.000056073808],"category_scores_gemma":[0.0000028361583,0.00031077082,0.00010462312,0.0002591606,0.000051939067,0.0005287543,9.477792e-7,0.00033473558,0.00013126014],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007180141,0.0002935875,0.000020191601,0.00013875257,0.00011878925,0.000002617913,0.0002749753,0.9973982,0.00045313535,0.00022650039,0.0008346986,0.00016674121],"study_design_scores_gemma":[0.0015004205,0.00052332046,0.00064584176,0.0003726641,0.00023799048,0.00012934885,0.000186488,0.9855243,0.00629385,0.000030913954,0.0035210303,0.0010338088],"about_ca_topic_score_codex":0.00002877314,"about_ca_topic_score_gemma":0.00001435786,"teacher_disagreement_score":0.86540985,"about_ca_system_score_codex":0.0009070177,"about_ca_system_score_gemma":0.00002829491,"threshold_uncertainty_score":0.99993443},"labels":[],"label_agreement":null},{"id":"W2077148637","doi":"10.1109/tpwrs.2014.2362923","title":"A Novel Adaptive Wide Area PSS Based on Output-Only Modal Analysis","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"China Postdoctoral Science Foundation; National Natural Science Foundation of China; University of Saskatchewan","keywords":"Adaptability; Electric power system; Computer science; Modal; Control theory (sociology); Modal analysis; Control engineering; Adaptive control; Grid; Power (physics); Engineering; Control (management); Mathematics","score_opus":0.015225536084242515,"score_gpt":0.20497507097893589,"score_spread":0.18974953489469337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077148637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018897814,0.000023869845,0.98240083,0.000051586394,0.0024923885,0.00042659932,0.00023941179,0.0006260082,0.011849512],"genre_scores_gemma":[0.9984534,0.0000017578409,0.0005827517,0.00009782963,0.000007758831,0.00011121731,0.000008977333,0.00005732902,0.0006789778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979961,0.00014818899,0.0005572445,0.0004573758,0.0004735239,0.00036755862],"domain_scores_gemma":[0.99847585,0.0002941342,0.00008070173,0.00079892203,0.00012933648,0.00022106888],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040050308,0.00036554324,0.0005737311,0.0005847338,0.00014864598,0.00010079906,0.00021949758,0.00019566574,0.00011854779],"category_scores_gemma":[0.000012814833,0.00035034257,0.00038199496,0.0009183252,0.000038866227,0.00014056038,6.686217e-7,0.0002852862,0.000117053845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055251578,0.00015974487,0.00011420315,0.00004653016,0.00037824278,0.0000013969296,0.00022474343,0.9985489,0.00006738768,0.00008933456,0.0002249917,0.00008926273],"study_design_scores_gemma":[0.0006905432,0.00016361827,0.0006948329,0.000078301855,0.00020179678,0.0000044617586,0.00011944028,0.99519855,0.00025988973,0.0000012680799,0.002220663,0.00036664546],"about_ca_topic_score_codex":0.00010766503,"about_ca_topic_score_gemma":0.00017915222,"teacher_disagreement_score":0.9965636,"about_ca_system_score_codex":0.000262765,"about_ca_system_score_gemma":0.00004380659,"threshold_uncertainty_score":0.99989486},"labels":[],"label_agreement":null},{"id":"W2078191985","doi":"10.1109/tpwrs.2014.2312418","title":"Synchrophasor Data Baselining and Mining for Online Monitoring of Dynamic Security Limits","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Time Series Analysis and Forecasting","field":"Computer Science","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; École de Technologie Supérieure","funders":"","keywords":"SCADA; Situation awareness; Computer science; Cluster analysis; Data mining; Situation analysis; Visibility; Electric power system; Key (lock); Real-time computing; Engineering; Artificial intelligence; Power (physics); Computer security","score_opus":0.033956521252692294,"score_gpt":0.27899004766979735,"score_spread":0.24503352641710505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078191985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089506455,0.00022800207,0.90866196,0.00005325941,0.0011900832,0.0001463668,0.00010760999,0.0000654667,0.000040805793],"genre_scores_gemma":[0.9647694,0.000019990954,0.035078358,0.000009575386,0.000023571687,0.0000114430495,0.000005840193,0.000014948529,0.00006684532],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864626,0.00006703035,0.00041606868,0.00045612294,0.0001969799,0.00021752378],"domain_scores_gemma":[0.9984997,0.00035498745,0.00017824983,0.00079096126,0.00010590156,0.00007023378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059384614,0.00014861822,0.00031223387,0.00013926742,0.00019305864,0.00011056736,0.000541421,0.0000649327,0.0000022276988],"category_scores_gemma":[0.000025509242,0.00013984091,0.00007061463,0.00023927189,0.000032980854,0.0004196766,0.000008589797,0.00010710457,0.0000013181411],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038475744,0.0024416642,0.0018339888,0.003273009,0.0023135112,0.000026312966,0.019401817,0.18747315,0.020667184,0.0030179787,0.00067049905,0.7584961],"study_design_scores_gemma":[0.00030356835,0.00021367385,0.00009282942,0.0002377259,0.000046226916,0.000014015919,0.00040913842,0.9972162,0.00049427664,0.000008761433,0.0008108707,0.00015269517],"about_ca_topic_score_codex":0.000055850483,"about_ca_topic_score_gemma":0.000023102075,"teacher_disagreement_score":0.875263,"about_ca_system_score_codex":0.0000218416,"about_ca_system_score_gemma":0.000023637054,"threshold_uncertainty_score":0.5702547},"labels":[],"label_agreement":null},{"id":"W2079821148","doi":"10.1109/tpwrs.2012.2221146","title":"A Novel Cooperative Protocol for Distributed Voltage Control in Active Distribution Systems","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":139,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Tap changer; Distributed generation; Transformer; Computer science; Voltage; Protocol (science); Decentralised system; Control (management); Control theory (sociology); Control engineering; Engineering; Distributed computing; Electrical engineering; Renewable energy","score_opus":0.012220005308104444,"score_gpt":0.23746716350620176,"score_spread":0.22524715819809732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2079821148","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013634002,0.00006577507,0.9202716,0.000011278319,0.0015245049,0.07393839,0.0037493764,0.00023052482,0.00007224075],"genre_scores_gemma":[0.7712299,0.0000018385449,0.00002279714,0.000007816904,0.00003866963,0.22853029,0.000079248006,0.000035706587,0.000053687134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861825,0.000057155994,0.000476281,0.00020966021,0.00016487131,0.00047380474],"domain_scores_gemma":[0.9993058,0.00012527352,0.00007943392,0.00020677311,0.00015551875,0.0001272061],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024120214,0.00027800474,0.00037574366,0.00008938406,0.00012033632,0.00008973738,0.00010095096,0.00018874356,0.000014700321],"category_scores_gemma":[0.0000078292705,0.00025770045,0.00010270746,0.00028999886,0.00002381591,0.0004042887,4.4984557e-7,0.00021845098,0.000021691025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034159046,0.00034202234,0.000018163111,0.00019848188,0.00013836921,7.2440463e-7,0.00029936238,0.99038213,0.007172889,0.00015797281,0.000765432,0.00018285484],"study_design_scores_gemma":[0.007624987,0.00019522564,0.00015011385,0.00025722096,0.000052742398,0.000020989308,0.0004150179,0.9578905,0.0035093052,7.407608e-7,0.02942148,0.0004616927],"about_ca_topic_score_codex":0.00007730138,"about_ca_topic_score_gemma":0.000021486589,"teacher_disagreement_score":0.92024875,"about_ca_system_score_codex":0.0004402988,"about_ca_system_score_gemma":0.000029036313,"threshold_uncertainty_score":0.99998754},"labels":[],"label_agreement":null},{"id":"W2081098056","doi":"10.1109/tpwrs.2013.2244077","title":"2.5 Beta Methodology—Impact of “Zero SAIDI” Days","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Zero (linguistics); Statistics; Reliability engineering; Mathematics; Event (particle physics); Econometrics; Computer science; Power (physics); Engineering","score_opus":0.028105860817638936,"score_gpt":0.2574582377716995,"score_spread":0.22935237695406058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081098056","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057478994,0.00044020667,0.9301956,0.000023375656,0.004530475,0.0006826288,0.000098402015,0.00035443643,0.006195846],"genre_scores_gemma":[0.9984234,0.000038247428,0.00049880537,0.000011205261,0.0000117905265,0.00017732289,0.0000014946936,0.000050631777,0.00078708766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9982722,0.00020820554,0.0006093514,0.00026950735,0.0002266237,0.0004141249],"domain_scores_gemma":[0.9986441,0.0002861965,0.00008335126,0.00068957405,0.00013456334,0.00016218955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047284976,0.00028513902,0.00057083124,0.00020149007,0.00006165487,0.000037365728,0.00027096175,0.0001863025,0.00032930932],"category_scores_gemma":[0.000009655909,0.00023815267,0.00034788085,0.00028087993,0.000077594,0.00026390355,0.0000010784596,0.00028768138,0.0004626589],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007210254,0.00043460386,0.00024498164,0.0011203436,0.0014884386,0.000013310555,0.0024996533,0.8974112,0.06892395,0.0007546221,0.024463655,0.0025730976],"study_design_scores_gemma":[0.013969446,0.009468494,0.021515958,0.0067764767,0.0014088036,0.0020811693,0.006028809,0.35173553,0.4761785,0.0023383184,0.09781763,0.010680858],"about_ca_topic_score_codex":0.0012397129,"about_ca_topic_score_gemma":0.00002068494,"teacher_disagreement_score":0.94094443,"about_ca_system_score_codex":0.00020113878,"about_ca_system_score_gemma":0.000038753366,"threshold_uncertainty_score":0.97115844},"labels":[],"label_agreement":null},{"id":"W2083246289","doi":"10.1109/tpwrs.2011.2177999","title":"Use of Markov Models in Assessing Spare Transformer Requirements for Distribution Stations","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Markov chain; Probabilistic logic; Distribution transformer; Redundancy (engineering); Engineering; Computer science; Mathematics; Electrical engineering; Statistics; Voltage; Operations management","score_opus":0.05507827211679493,"score_gpt":0.2724118621373251,"score_spread":0.21733359002053015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083246289","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03454219,0.00017333784,0.9603968,0.000016149992,0.002699317,0.00083809707,0.000873421,0.000102537255,0.0003581472],"genre_scores_gemma":[0.99904144,0.000029967303,0.0004249337,0.000005771957,0.000009302903,0.00030895445,0.000029089448,0.000032254462,0.00011829471],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986238,0.0000576641,0.00056870136,0.00015631037,0.00020024215,0.0003933031],"domain_scores_gemma":[0.99936754,0.0001387243,0.000059929516,0.00025359387,0.000088940615,0.00009126948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037526485,0.00017493765,0.00028331793,0.00012512653,0.00006815765,0.000043655236,0.00008226391,0.00012081094,0.000008713817],"category_scores_gemma":[0.000006519098,0.00017584494,0.00011595096,0.00023207934,0.000028457978,0.0013352986,2.65613e-7,0.00012890514,0.0000047665494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071090675,0.00040960443,0.00020258744,0.0010843134,0.00013153885,7.495004e-7,0.0019955905,0.9883469,0.004757013,0.0010493386,0.0008561578,0.0010951322],"study_design_scores_gemma":[0.003764172,0.0003770935,0.0030029493,0.003599177,0.00028478567,0.000040741343,0.0040346826,0.9021561,0.047586605,0.00019791565,0.0331905,0.0017652508],"about_ca_topic_score_codex":0.00012118268,"about_ca_topic_score_gemma":0.000056719025,"teacher_disagreement_score":0.96449924,"about_ca_system_score_codex":0.00028587074,"about_ca_system_score_gemma":0.000024838357,"threshold_uncertainty_score":0.7170748},"labels":[],"label_agreement":null},{"id":"W2085187722","doi":"10.1109/tpwrs.2012.2196450","title":"Development and Analysis of Applicability of a Hybrid Transient Simulation Platform Combining TSA and EMT Elements","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Transient (computer programming); Fault (geology); Electric power system; Computer science; Electronic engineering; Interface (matter); Engineering; Stability (learning theory); Transient analysis; Power (physics); Control engineering; Electrical engineering; Transient response","score_opus":0.015110785578969985,"score_gpt":0.2440666618758491,"score_spread":0.22895587629687914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085187722","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.683054,0.000036716334,0.31626445,0.0000020625428,0.00007111585,0.0001440347,0.00003278992,0.000007037997,0.00038779483],"genre_scores_gemma":[0.99963313,8.1294e-7,0.00028185968,0.0000021959634,0.0000041546914,0.000032248274,0.000008510476,0.0000068702575,0.000030197183],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991159,0.00002221774,0.0003965471,0.00014434574,0.00015016842,0.00017081696],"domain_scores_gemma":[0.99956024,0.00006578824,0.00012593309,0.00013583855,0.00003500098,0.00007719518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023185514,0.00010968961,0.00028791963,0.00014087748,0.000076843884,0.000011027486,0.0000371168,0.00001690402,0.00002826715],"category_scores_gemma":[2.9054726e-7,0.00010017496,0.0000575851,0.0001937924,0.00003136385,0.00008610257,8.973504e-7,0.00006232183,7.6413977e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010783838,0.011347473,0.33333412,0.0017405679,0.027202345,0.0000013153607,0.14770651,0.27852452,0.08195559,0.009042836,0.00006446999,0.10800185],"study_design_scores_gemma":[0.011821711,0.0025078366,0.1616645,0.0007466873,0.008572432,0.000009407738,0.020336488,0.3844583,0.3988759,0.0002941597,0.007783989,0.0029285976],"about_ca_topic_score_codex":0.00005784722,"about_ca_topic_score_gemma":0.0000015459948,"teacher_disagreement_score":0.3169203,"about_ca_system_score_codex":0.000021896181,"about_ca_system_score_gemma":0.0000151977265,"threshold_uncertainty_score":0.40850165},"labels":[],"label_agreement":null},{"id":"W2085767019","doi":"10.1109/tpwrs.2013.2291400","title":"A Trend-Oriented Power System Security Analysis Method Based on Load Profile","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Fundamental Research Funds for the Central Universities","keywords":"Electric power system; Security analysis; Computer science; Reliability engineering; Power flow; Contingency; Margin (machine learning); Field (mathematics); Power-flow study; Power (physics); Mathematical optimization; Engineering; Mathematics; Computer security","score_opus":0.0062330442238847025,"score_gpt":0.22498667958334545,"score_spread":0.21875363535946074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085767019","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014322418,0.000043668417,0.9474613,0.000022574408,0.0041898405,0.0007044736,0.00043465217,0.0013815027,0.044329748],"genre_scores_gemma":[0.99815255,0.0000011067092,0.00086265017,0.000040259594,0.000011008745,0.00029369857,0.00002452821,0.00007512858,0.0005390437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964992,0.00069260044,0.0008548304,0.0006532501,0.0007991674,0.0005009922],"domain_scores_gemma":[0.9979008,0.00029174882,0.00013410048,0.0012131325,0.0001554145,0.00030479103],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012289569,0.0004875267,0.00085372967,0.00069894333,0.00021282904,0.00012249073,0.00025888445,0.00029173243,0.00036614115],"category_scores_gemma":[0.000013807327,0.00045499665,0.00053558097,0.0017223799,0.00003465344,0.00015470885,0.0000011515424,0.00038304782,0.00018258282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078759054,0.00022222559,0.0000399792,0.00029329225,0.00055346364,0.0000044752496,0.0008336318,0.9969601,0.00006903285,0.00038460805,0.0004831504,0.00007727239],"study_design_scores_gemma":[0.0008406077,0.00018865739,0.00007432618,0.00014312852,0.0002964356,0.000007918725,0.00047041572,0.9856145,0.0008637652,7.2529e-7,0.011038087,0.00046146248],"about_ca_topic_score_codex":0.00009385109,"about_ca_topic_score_gemma":0.00013021816,"teacher_disagreement_score":0.9967203,"about_ca_system_score_codex":0.0007236571,"about_ca_system_score_gemma":0.000050330982,"threshold_uncertainty_score":0.9997902},"labels":[],"label_agreement":null},{"id":"W2086870088","doi":"10.1109/tpwrs.2014.2362653","title":"Uncertainties of EV Charging and Effects on Well-Being Analysis of Generating Systems","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Punctuality; Vehicle-to-grid; Reliability engineering; Electric power system; Reliability (semiconductor); Grid; Automotive engineering; Electric vehicle; Computer science; Engineering; Power (physics); Transport engineering","score_opus":0.0030821324443265365,"score_gpt":0.18363827188028178,"score_spread":0.18055613943595525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2086870088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52899647,0.0004072743,0.46846035,0.000003970945,0.00090777816,0.00016357035,0.0000084471485,0.00007272685,0.0009794061],"genre_scores_gemma":[0.9997527,0.000034465593,0.00005721553,0.0000098285445,0.000023648468,0.000019363399,0.0000013385626,0.000027187678,0.00007425076],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894124,0.00008293709,0.0003947759,0.00017461827,0.00021425523,0.00019219841],"domain_scores_gemma":[0.9993518,0.00020431871,0.00009717636,0.00023930319,0.000053831234,0.000053552994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002204419,0.00017914742,0.0004980127,0.00047188616,0.00007806703,0.00003572857,0.00008212409,0.00010573869,0.0000068309205],"category_scores_gemma":[0.00000352932,0.00016035882,0.00011934001,0.00054317666,0.000019670379,0.000068907386,4.3379578e-7,0.00016835648,0.0000017978923],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007266944,0.000010071774,0.00013618685,0.0005702019,0.00067920255,6.4066285e-7,0.0006116173,0.95385826,0.042794265,0.00038368948,0.00003702033,0.0009115955],"study_design_scores_gemma":[0.0002346414,0.00018617688,0.0002500809,0.00035986077,0.00033858285,0.000004668875,0.0002106373,0.9365045,0.061530523,0.0000037135053,0.00020152704,0.00017508098],"about_ca_topic_score_codex":0.00017378549,"about_ca_topic_score_gemma":0.000009146501,"teacher_disagreement_score":0.47075623,"about_ca_system_score_codex":0.000048506234,"about_ca_system_score_gemma":0.0000063398174,"threshold_uncertainty_score":0.6539243},"labels":[],"label_agreement":null},{"id":"W2087848664","doi":"10.1109/tpwrs.2011.2180935","title":"Time-of-Use Pricing in Electricity Markets Under Different Market Structures","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Electricity pricing; Electricity; Economics; Context (archaeology); Microeconomics; Variable pricing; Welfare; Scheme (mathematics); Market power; Econometrics; Industrial organization; Monopoly; Engineering; Market economy; Mathematics","score_opus":0.00840577856234772,"score_gpt":0.20087651612512983,"score_spread":0.1924707375627821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087848664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25976545,0.0004503366,0.73495436,0.0000048245306,0.0021992808,0.000541745,0.000020446816,0.00024203862,0.0018215303],"genre_scores_gemma":[0.9989923,0.00004689438,0.000103313905,0.000010070186,0.000018091025,0.000057168152,0.0000025708123,0.00007094634,0.0006986084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981107,0.00021381996,0.00059192505,0.0002091671,0.0003394993,0.00053485687],"domain_scores_gemma":[0.9990934,0.00026734275,0.00009535654,0.0003694977,0.00004959497,0.00012481186],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031520653,0.00030190052,0.0004286109,0.0005596533,0.000053248474,0.000043276712,0.00015477958,0.00020101898,0.00015273948],"category_scores_gemma":[0.000008133453,0.0002848866,0.00009900574,0.0006545762,0.0000210763,0.00038395,9.959645e-7,0.0003116486,0.000022445898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001709321,0.00044275916,0.002248407,0.00050667924,0.00041278385,0.000005745232,0.0017438235,0.9779093,0.0130641395,0.00016361919,0.0028089618,0.0005228038],"study_design_scores_gemma":[0.002657811,0.0003170099,0.0638404,0.00087416556,0.00021736708,0.00021095267,0.0004140997,0.8537775,0.07470097,0.000026523152,0.0010266657,0.0019364934],"about_ca_topic_score_codex":0.000059546535,"about_ca_topic_score_gemma":0.00001043288,"teacher_disagreement_score":0.7392269,"about_ca_system_score_codex":0.00040947218,"about_ca_system_score_gemma":0.000018575362,"threshold_uncertainty_score":0.9999603},"labels":[],"label_agreement":null},{"id":"W2087939098","doi":"10.1109/tpwrs.2013.2254729","title":"General Interface for Power Management of Micro-Grids Using Nonlinear Cooperative Droop Control","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Controller (irrigation); Microgrid; Voltage droop; Control theory (sociology); Control reconfiguration; Control engineering; Power management; Electric power system; Converters; Automatic frequency control; Open-loop controller; Engineering; Computer science; Power (physics); Synchronization (alternating current); Power control; Voltage regulator; Control (management); Voltage; Electrical engineering; Embedded system","score_opus":0.007952329948782543,"score_gpt":0.21802571065983858,"score_spread":0.21007338071105605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2087939098","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042924445,0.0006137691,0.9524562,0.000022035501,0.0020869572,0.0013369757,0.00016574268,0.00011541389,0.0002784792],"genre_scores_gemma":[0.9940023,0.00004412127,0.00505896,0.0000237459,0.000020583757,0.00020671477,0.0000041837557,0.000050999915,0.0005883791],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903584,0.00003138322,0.0003708495,0.00019326729,0.00011510714,0.00025355007],"domain_scores_gemma":[0.999469,0.000030714138,0.000056876263,0.00021870178,0.00015984975,0.00006489538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008940362,0.00021036697,0.0003034585,0.00011640062,0.00007454922,0.000064684544,0.000118681244,0.000095528165,0.00010639888],"category_scores_gemma":[5.3733817e-7,0.00019811366,0.00012218945,0.00013560668,0.000025836815,0.00017088211,7.2758974e-7,0.00010493185,0.000032849384],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036860816,0.00005953258,0.0000016555218,0.000111531255,0.0003675902,7.669993e-7,0.00018217787,0.9305864,0.06797548,0.000017909895,0.0004038268,0.00025626898],"study_design_scores_gemma":[0.0017449672,0.00014302973,0.000006137709,0.00014308341,0.000093806084,0.000007783887,0.00027527337,0.95216876,0.04326386,0.0000011282085,0.0019122962,0.00023984391],"about_ca_topic_score_codex":0.000045359546,"about_ca_topic_score_gemma":0.0000032660612,"teacher_disagreement_score":0.9510779,"about_ca_system_score_codex":0.00009478465,"about_ca_system_score_gemma":0.000011516177,"threshold_uncertainty_score":0.8078841},"labels":[],"label_agreement":null},{"id":"W2095665432","doi":"10.1109/59.852140","title":"State-space system identification-toward MIMO models for modal analysis and optimization of bulk power systems","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"MIMO; Identification (biology); Realization (probability); Computer science; Control engineering; Computation; System identification; Time domain; State space; Modal; Transfer function; Electric power system; Control theory (sociology); State-space representation; Power (physics); Engineering; Data modeling; Control (management); Algorithm; Channel (broadcasting); Mathematics; Telecommunications","score_opus":0.0113325213268772,"score_gpt":0.21321032150930636,"score_spread":0.20187780018242915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095665432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00624713,0.0006032664,0.9868444,0.000017898765,0.001966022,0.0015532847,0.00096346677,0.0005072975,0.0012972031],"genre_scores_gemma":[0.9971751,0.000083925566,0.0009291172,0.0000032965743,0.000004506367,0.00040981328,0.000032484964,0.00007905775,0.0012827078],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972153,0.00017334362,0.0012442456,0.00054020376,0.00045380762,0.00037314894],"domain_scores_gemma":[0.998355,0.0001524813,0.00020394125,0.00072345755,0.0003613178,0.00020383103],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00060038816,0.00038455764,0.0008156663,0.0005855701,0.00018164328,0.00020825899,0.00022373366,0.00023017445,0.00007089249],"category_scores_gemma":[0.000004231548,0.0003937135,0.00028873628,0.0009793955,0.000063469226,0.00046923978,0.0000011165338,0.00014657716,0.000015815545],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006862311,0.00007850167,0.000012278063,0.0007952104,0.0007292779,9.058987e-7,0.0014723853,0.996377,0.0001359199,0.0002267663,0.00008028844,0.00002282469],"study_design_scores_gemma":[0.000581786,0.00007242651,0.00002094695,0.00013662965,0.00033557907,0.00001274926,0.0010491199,0.99666846,0.00056465867,0.000003577024,0.00020070116,0.00035335266],"about_ca_topic_score_codex":0.0002235694,"about_ca_topic_score_gemma":0.000017796383,"teacher_disagreement_score":0.99092793,"about_ca_system_score_codex":0.00025637218,"about_ca_system_score_gemma":0.000040470353,"threshold_uncertainty_score":0.99985147},"labels":[],"label_agreement":null},{"id":"W2095731600","doi":"10.1109/tpwrs.2008.2008606","title":"Applying Wavelets to Short-Term Load Forecasting Using PSO-Based Neural Networks","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":409,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Particle swarm optimization; Artificial neural network; Computer science; Wavelet; Term (time); Backpropagation; Algorithm; Preprocessor; Data pre-processing; Mathematical optimization; Artificial intelligence; Mathematics","score_opus":0.02992717806607406,"score_gpt":0.23633140543955458,"score_spread":0.20640422737348052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095731600","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14514309,0.00019570942,0.84788394,0.000013537259,0.0041609053,0.00052201044,0.000014820639,0.000619096,0.0014469036],"genre_scores_gemma":[0.9986382,0.00000280607,0.00082619267,0.00014325061,0.00012690437,0.00010502647,0.0000036806518,0.00009040718,0.000063544794],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792176,0.00004770915,0.0005522955,0.00038478518,0.00037523813,0.00071817916],"domain_scores_gemma":[0.99912024,0.00009293454,0.00004734596,0.0003873473,0.00007792655,0.0002742081],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023156479,0.00041875805,0.00038960282,0.0002628601,0.00030485218,0.0001722639,0.0002203486,0.00019633443,0.000021295988],"category_scores_gemma":[0.0000037818475,0.0004410168,0.00018672732,0.00051582704,0.000017534012,0.00021039715,0.0000010649237,0.0004511068,0.000012587632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017670396,0.000033340035,0.000030839605,0.000038920105,0.000034854853,0.000037651083,0.00018809769,0.98345715,0.0039157206,0.000006478907,0.00006022615,0.012179034],"study_design_scores_gemma":[0.00027996433,0.00013811718,0.000030290306,0.00041373033,0.000035693694,0.000093940966,0.000050710987,0.9945646,0.0032167935,0.000001022114,0.0006937014,0.00048146016],"about_ca_topic_score_codex":0.00004323651,"about_ca_topic_score_gemma":0.000025591027,"teacher_disagreement_score":0.8534951,"about_ca_system_score_codex":0.00031146235,"about_ca_system_score_gemma":0.000029605366,"threshold_uncertainty_score":0.99980414},"labels":[],"label_agreement":null},{"id":"W2095978179","doi":"10.1109/tpwrs.2005.856992","title":"An Aggregate Weibull Approach for Modeling Short-Term System Generating Capacity","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Spot contract; Electricity; Electricity market; Weibull distribution; Electric power system; Deregulation; Reliability (semiconductor); Economics; Term (time); Reliability engineering; Electricity price forecasting; Aggregate (composite); Computer science; Econometrics; Engineering; Power (physics); Finance; Macroeconomics; Futures contract; Electrical engineering","score_opus":0.023051349411904176,"score_gpt":0.2238200022317906,"score_spread":0.20076865281988643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095978179","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0812977,0.00033839754,0.9113536,0.000008394855,0.00324507,0.001168999,0.00018039145,0.0011457104,0.0012617197],"genre_scores_gemma":[0.99196726,0.000016723217,0.0068166475,0.000015417225,0.0001622554,0.00076297583,0.00001072673,0.00011046161,0.0001375564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99766165,0.00010261573,0.0007691145,0.0005484572,0.0003010623,0.00061710423],"domain_scores_gemma":[0.99873364,0.000054126675,0.000058826703,0.0007643002,0.00014558253,0.0002435043],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006288499,0.00041067324,0.00052232726,0.00016531881,0.0003185965,0.00017427742,0.00032451126,0.00026789584,0.0000038666576],"category_scores_gemma":[0.0000031293569,0.0004013965,0.00023308456,0.0001715166,0.000032498778,0.0004663154,8.826207e-7,0.00032590446,0.00002728604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019368783,0.00009586829,0.000002386275,0.0006747786,0.00008865799,0.0000013965404,0.00072147866,0.9898785,0.007739399,0.00017148237,0.00007262108,0.00053408754],"study_design_scores_gemma":[0.00035348174,0.00009360913,6.0883895e-7,0.00027848248,0.00004666792,0.000084743835,0.0006217077,0.9913968,0.0056484295,8.9247936e-7,0.0010328833,0.00044170333],"about_ca_topic_score_codex":0.000071800234,"about_ca_topic_score_gemma":0.000043938835,"teacher_disagreement_score":0.9106695,"about_ca_system_score_codex":0.0005073691,"about_ca_system_score_gemma":0.000028073606,"threshold_uncertainty_score":0.9998438},"labels":[],"label_agreement":null},{"id":"W2096528909","doi":"10.1109/tpwrs.2006.876644","title":"Major Event Day Segmentation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science; Event (particle physics); Electric power system; Segmentation; Index (typography); Range (aeronautics); Electric utility; Reliability engineering; Data mining; Power (physics); Engineering; Artificial intelligence; Electrical engineering","score_opus":0.005124689124077807,"score_gpt":0.1986637364620699,"score_spread":0.19353904733799207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096528909","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0125307515,0.00033256895,0.97084355,0.00003799626,0.0077819414,0.0004936617,0.00006849814,0.00055415975,0.007356844],"genre_scores_gemma":[0.99671084,0.000011465787,0.000079324825,0.00001728455,0.0000314988,0.0001911756,0.0000048121033,0.000040008727,0.0029135668],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987608,0.00006413943,0.00041707628,0.00022292677,0.0002462534,0.00028878363],"domain_scores_gemma":[0.999457,0.00005117375,0.00004065643,0.0003385407,0.000044701927,0.00006790823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024272532,0.00019874258,0.00021107394,0.00011981739,0.000100446225,0.000058564136,0.000121073,0.00010814585,0.00006788823],"category_scores_gemma":[0.0000010946898,0.00019137384,0.00011765811,0.00019105308,0.000024267569,0.00017165295,3.5699048e-7,0.00015754248,0.00038627407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021382584,0.00022148156,0.00003292419,0.0003485743,0.00012518557,0.000016668866,0.0005306582,0.9642653,0.01995254,0.0006657309,0.013234499,0.00058509764],"study_design_scores_gemma":[0.006486125,0.0009038074,0.0022472634,0.002049844,0.00038258958,0.00042848208,0.002821284,0.25960582,0.3514155,0.00042572644,0.36914617,0.004087404],"about_ca_topic_score_codex":0.00024583822,"about_ca_topic_score_gemma":0.000087473156,"teacher_disagreement_score":0.9841801,"about_ca_system_score_codex":0.00023731377,"about_ca_system_score_gemma":0.000014585042,"threshold_uncertainty_score":0.78039986},"labels":[],"label_agreement":null},{"id":"W2096720283","doi":"10.1109/tpwrs.2005.846114","title":"An Integrated Distributed Generation Optimization Model for Distribution System Planning","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":519,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Distributed generation; Planner; Sizing; Key (lock); Engineering; Purchasing; Mathematical optimization; Operations research; Computer science; Operations management; Renewable energy","score_opus":0.018550109942458315,"score_gpt":0.23924038891127675,"score_spread":0.22069027896881843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096720283","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066618174,0.00008781125,0.9825817,0.000024461124,0.0020338062,0.0009388424,0.006142603,0.0014724575,0.00005652239],"genre_scores_gemma":[0.9907383,0.0000053087465,0.0041775666,0.000009288117,0.000086515705,0.00043841585,0.004417084,0.00007794495,0.000049604387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99825037,0.00006321234,0.0006000865,0.00038359492,0.00029137146,0.00041134274],"domain_scores_gemma":[0.99905103,0.000031913605,0.00008852707,0.00039168348,0.00026369316,0.00017313786],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002841697,0.00034810047,0.00030296258,0.00013553337,0.00029908892,0.00023124529,0.00018411729,0.00028341595,0.000009887229],"category_scores_gemma":[0.000004884399,0.00037237775,0.0001243838,0.00032936726,0.000024242012,0.00073900796,5.622894e-7,0.00022806288,0.000027413926],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050345203,0.00009369971,0.0000013437289,0.000073689276,0.000056212935,8.25937e-7,0.0001465043,0.99485177,0.002470199,0.00019496153,0.0018273297,0.00023309448],"study_design_scores_gemma":[0.00062375504,0.00014842911,0.0000026386535,0.00010824586,0.00006666535,0.000015805572,0.00023536736,0.9927638,0.0043740836,4.8998885e-7,0.001286695,0.00037401624],"about_ca_topic_score_codex":0.000014360348,"about_ca_topic_score_gemma":0.000009640195,"teacher_disagreement_score":0.98407644,"about_ca_system_score_codex":0.0011837396,"about_ca_system_score_gemma":0.000042955613,"threshold_uncertainty_score":0.9998728},"labels":[],"label_agreement":null},{"id":"W2097116508","doi":"10.1109/tpwrs.2009.2021232","title":"Effects of Wind Power on Bulk System Adequacy Evaluation Using the Well-Being Analysis Framework","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Electric power system; Probabilistic logic; Monte Carlo method; Reliability engineering; Wind power; Reliability (semiconductor); Bridge (graph theory); Wind speed; Computer science; Engineering; Power (physics); Statistics; Mathematics; Electrical engineering; Meteorology","score_opus":0.007635261280937314,"score_gpt":0.23498952050441715,"score_spread":0.22735425922347985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097116508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13335498,0.0005795442,0.8558241,0.0000399087,0.004730419,0.0012864926,0.000014222701,0.00028652404,0.0038838028],"genre_scores_gemma":[0.99963975,0.000012581762,0.00009876938,0.000040995517,0.000032808122,0.000055353623,0.0000011057812,0.000040903014,0.00007770897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99715614,0.00039706434,0.0007678058,0.00040808273,0.00084454083,0.0004263813],"domain_scores_gemma":[0.998027,0.00057128066,0.00018287536,0.00091031066,0.00019557077,0.00011295618],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011331267,0.00036894812,0.00068264507,0.00045129124,0.00022181636,0.00008710925,0.00032316466,0.00028781017,0.000027956527],"category_scores_gemma":[0.000028489796,0.00028806372,0.00045360177,0.001278171,0.000047725513,0.00017866777,0.0000010362844,0.00046995946,0.000052703494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041652132,0.00011126801,0.000007641168,0.00037518516,0.0006946502,0.0000061984274,0.001625868,0.99340665,0.002329916,0.0012266168,0.00004370689,0.00013065958],"study_design_scores_gemma":[0.0011802925,0.0006449947,0.00095350697,0.0045416816,0.0029109234,0.000049096496,0.0018082212,0.95577425,0.030021831,0.000101895166,0.0010930315,0.0009202925],"about_ca_topic_score_codex":0.00008281652,"about_ca_topic_score_gemma":0.00000555952,"teacher_disagreement_score":0.8662848,"about_ca_system_score_codex":0.0005421548,"about_ca_system_score_gemma":0.000041702646,"threshold_uncertainty_score":0.99995714},"labels":[],"label_agreement":null},{"id":"W2097192841","doi":"10.1109/tpwrs.2003.818689","title":"Transmission network cost allocation based on equivalent bilateral exchanges","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":175,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Fraction (chemistry); Transmission (telecommunications); Generator (circuit theory); Computer science; Transmission network; Independence (probability theory); Mathematical optimization; Power flow; Economic dispatch; Power (physics); Electric power system; Telecommunications; Mathematics; Statistics","score_opus":0.013044449559547238,"score_gpt":0.213739998805969,"score_spread":0.20069554924642177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097192841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00069883856,0.00037506846,0.98473465,0.00005484501,0.005239346,0.0010714054,0.000016345874,0.00066978455,0.007139722],"genre_scores_gemma":[0.99821025,0.00007455896,0.00047634885,0.000069627524,0.00003362758,0.00034022052,0.0000108670365,0.00010405015,0.0006804767],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99796736,0.00023394446,0.0004876171,0.0003604963,0.0004396131,0.0005109914],"domain_scores_gemma":[0.9990964,0.00011470951,0.00006835169,0.00046756727,0.000075403914,0.00017757148],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000403838,0.000353295,0.0003140594,0.00030027112,0.00018182235,0.000092975235,0.00014813575,0.00022897078,0.00015869227],"category_scores_gemma":[0.0000028795737,0.00034414852,0.00013011495,0.0006192061,0.000016908949,0.00016346126,2.0170987e-7,0.00027960478,0.00014083691],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003318011,0.00009309301,0.000006662817,0.000108050066,0.000045340505,0.000004657657,0.00016411163,0.9962193,0.00080693845,0.000097265925,0.0015203361,0.0009010877],"study_design_scores_gemma":[0.0011391251,0.0003888668,0.000023560491,0.0005977142,0.000058807986,0.00002882692,0.000055293283,0.94979817,0.014953776,0.000007479331,0.03234963,0.0005987432],"about_ca_topic_score_codex":0.000018616576,"about_ca_topic_score_gemma":0.000007477826,"teacher_disagreement_score":0.9975114,"about_ca_system_score_codex":0.00037257007,"about_ca_system_score_gemma":0.00004404648,"threshold_uncertainty_score":0.99990106},"labels":[],"label_agreement":null},{"id":"W2098397733","doi":"10.1109/tpwrs.2005.846203","title":"Deregulated Power Prices: Changes Over Time","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Volatility (finance); Economics; Deregulation; Excursion; Price level; Mid price; Monetary economics; Econometrics; Financial economics; Macroeconomics","score_opus":0.005151329615617712,"score_gpt":0.1879213485478605,"score_spread":0.1827700189322428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098397733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010729138,0.0008805091,0.96868986,0.00009733115,0.0032704843,0.00078755966,0.00005280879,0.0017684808,0.013723846],"genre_scores_gemma":[0.9947519,0.00003945877,0.00025372594,0.00006482244,0.00003731667,0.00011935123,0.0000073120414,0.00012223738,0.004603924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99827033,0.00006183599,0.00043799938,0.00033836998,0.0004000723,0.0004914118],"domain_scores_gemma":[0.999093,0.00006974895,0.00007796504,0.00051765697,0.000084655934,0.00015696019],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00019440969,0.00035494805,0.00035962413,0.00040121764,0.000120645804,0.000112130656,0.00022268199,0.00026439445,0.000675656],"category_scores_gemma":[0.0000022362406,0.0003588057,0.00010601784,0.00063343666,0.000022355534,0.00031872734,7.879036e-7,0.00025683007,0.0012936846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028078004,0.00015348344,0.000005833953,0.00010885362,0.00033945809,0.000008998623,0.0011879231,0.9773086,0.009865481,0.000066482775,0.010260924,0.0006659057],"study_design_scores_gemma":[0.0018336591,0.0004137849,0.00014362817,0.00050892646,0.0001435703,0.000206673,0.00012985404,0.8416685,0.036357515,0.0000034513505,0.11703739,0.00155304],"about_ca_topic_score_codex":0.0000226485,"about_ca_topic_score_gemma":0.000024823916,"teacher_disagreement_score":0.98402274,"about_ca_system_score_codex":0.00036368397,"about_ca_system_score_gemma":0.000025845087,"threshold_uncertainty_score":0.9998864},"labels":[],"label_agreement":null},{"id":"W2099012137","doi":"10.1109/tpwrs.2004.835650","title":"Pay-as-Bid versus Marginal Pricing–Part II: Market Behavior Under Strategic Generator Offers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Payment; Marginal cost; Generator (circuit theory); Economics; Microeconomics; Electricity market; Marginal utility; Yield (engineering); Electricity; Econometrics; Power (physics); Finance; Engineering","score_opus":0.017262599924604362,"score_gpt":0.22379331815591813,"score_spread":0.20653071823131378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099012137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14600112,0.00035777577,0.80888474,0.00008567669,0.021602917,0.0014008825,0.00009584536,0.0013244478,0.020246604],"genre_scores_gemma":[0.99675816,0.000066265085,0.00018429627,0.000030268779,0.00007467595,0.00034348769,0.000010415193,0.00013499391,0.0023974387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99770045,0.00008832001,0.00060871895,0.0004588253,0.0005409821,0.00060268276],"domain_scores_gemma":[0.998925,0.00005588662,0.000093379495,0.0005746222,0.00011027945,0.00024088405],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022976773,0.00045618904,0.00040836039,0.00036737663,0.00029415326,0.00015389311,0.00025486833,0.00030093093,0.0003220079],"category_scores_gemma":[0.0000021232374,0.00043402062,0.00016814854,0.0006668494,0.00003911744,0.0002894111,0.0000014537263,0.0004674024,0.0002643022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015495798,0.000282921,0.0000070235455,0.00012343869,0.0002930443,0.00005769826,0.00027375543,0.9938008,0.0027643305,0.00083641364,0.0013351152,0.00007050992],"study_design_scores_gemma":[0.0739596,0.019248253,0.0009602327,0.0053452607,0.0052532214,0.004545774,0.014980371,0.5410973,0.25026605,0.00039079948,0.06458311,0.019370044],"about_ca_topic_score_codex":0.00021064981,"about_ca_topic_score_gemma":0.000063901694,"teacher_disagreement_score":0.85075706,"about_ca_system_score_codex":0.0012077627,"about_ca_system_score_gemma":0.00017391582,"threshold_uncertainty_score":0.9998112},"labels":[],"label_agreement":null},{"id":"W2099338622","doi":"10.1109/tpwrs.2005.846188","title":"Introduction to Cumulant-Based Probabilistic Optimal Power Flow (P-OPF)","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Power flow; Probabilistic logic; Cumulant; Mathematical optimization; AC power; Electric power system; Computer science; Flow (mathematics); Power (physics); Reliability engineering; Control theory (sociology); Mathematics; Engineering; Voltage; Statistics; Electrical engineering; Artificial intelligence","score_opus":0.007290677900398316,"score_gpt":0.204909744080159,"score_spread":0.1976190661797607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099338622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013298762,0.0001263287,0.97197586,0.001004578,0.0100112865,0.0010888078,0.00011905161,0.0009816883,0.0013936143],"genre_scores_gemma":[0.9957333,0.0000045442425,0.0021522054,0.00011773235,0.00022636847,0.00036667648,0.0000051147126,0.00008454731,0.0013094622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99773127,0.00009240306,0.00062872533,0.00056073314,0.00040220076,0.00058469374],"domain_scores_gemma":[0.99859667,0.00007984307,0.000049543793,0.0008470039,0.00014633588,0.0002805965],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004090156,0.00038994485,0.00043114772,0.00028799364,0.00014599993,0.000111197594,0.00026636195,0.00020175257,0.0002867561],"category_scores_gemma":[0.000017814995,0.00038004352,0.000187829,0.0004308698,0.00004829433,0.0002604648,0.000001222936,0.00036251717,0.0015498938],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006671069,0.00015410135,0.0000010393303,0.00014523909,0.00005658246,0.0000045312922,0.0004501039,0.9830426,0.0016331815,0.00006953257,0.013954477,0.00042192463],"study_design_scores_gemma":[0.0008336636,0.00042605313,0.000021888394,0.0002846272,0.000055620218,0.00008719416,0.00021884241,0.6004056,0.010217477,0.0000032514733,0.38664785,0.00079795223],"about_ca_topic_score_codex":0.000035002526,"about_ca_topic_score_gemma":0.000051954004,"teacher_disagreement_score":0.9824346,"about_ca_system_score_codex":0.00055622135,"about_ca_system_score_gemma":0.00005377754,"threshold_uncertainty_score":0.9998652},"labels":[],"label_agreement":null},{"id":"W2099975670","doi":"10.1109/tpwrs.2009.2037153","title":"Fast Computation of Pure Strategy Nash Equilibria in Electricity Markets Cleared by Merit Order","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Clearance; Nash equilibrium; Oligopoly; Electricity market; Mathematical optimization; Constant (computer programming); Block (permutation group theory); Computation; Market power; Order (exchange); Integer programming; Electricity; Linear programming; Computer science; Mathematical economics; Economics; Mathematics; Microeconomics; Engineering; Algorithm; Monopoly; Electrical engineering; Combinatorics","score_opus":0.005021927800946435,"score_gpt":0.20625697614811264,"score_spread":0.2012350483471662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099975670","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21081972,0.0001729177,0.7832979,0.000012709537,0.0023101831,0.00060154893,0.000058383823,0.0002848875,0.0024417841],"genre_scores_gemma":[0.99937564,0.00002139196,0.00019527071,0.000005393848,0.000012686024,0.00006548685,0.000014022385,0.00007257184,0.00023751236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981828,0.0001299153,0.00067607936,0.00029317243,0.00034721332,0.00037083498],"domain_scores_gemma":[0.9992556,0.00008472566,0.00011769686,0.00029460143,0.00015236602,0.000095012896],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003124889,0.00026690593,0.00039514297,0.00039613104,0.000052386895,0.0000657681,0.00019030434,0.00029222196,0.000061906845],"category_scores_gemma":[0.000007821109,0.00029705188,0.00007356758,0.0011726181,0.000026955655,0.0002869519,7.803552e-7,0.00052870566,0.00002686406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008233742,0.00023565549,0.00006598701,0.00025887627,0.00012690037,0.000005573308,0.00045145588,0.7650148,0.22973007,0.000050420036,0.0021765796,0.0018013424],"study_design_scores_gemma":[0.0012713409,0.00022524319,0.00032541298,0.00015720911,0.0000338235,0.00004970072,0.00017050905,0.9665996,0.03019148,0.000010257976,0.00044859387,0.0005168224],"about_ca_topic_score_codex":0.0001430443,"about_ca_topic_score_gemma":0.00015149389,"teacher_disagreement_score":0.7885559,"about_ca_system_score_codex":0.00012702742,"about_ca_system_score_gemma":0.00005962566,"threshold_uncertainty_score":0.99994814},"labels":[],"label_agreement":null},{"id":"W2100280406","doi":"10.1109/tpwrs.2007.901485","title":"Customer-Owned Back-Up Generators for Energy Management by Distribution Utilities","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity; Load management; Energy management; Electricity generation; Electricity market; Market penetration; Computer science; Distributed generation; Reciprocating motion; Automotive engineering; Operations research; Business; Environmental economics; Industrial organization; Engineering; Economics; Electrical engineering; Renewable energy; Energy (signal processing); Power (physics)","score_opus":0.0077145261126909965,"score_gpt":0.1983987373152646,"score_spread":0.19068421120257362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100280406","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002374369,0.0002950667,0.978245,0.000019967616,0.0113764405,0.00041237206,0.00031570956,0.0004824678,0.0064785816],"genre_scores_gemma":[0.9914588,0.000108592096,0.00017158629,0.000043583823,0.000060539278,0.00033905936,0.00009523201,0.00007683146,0.0076457853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99836737,0.000026218038,0.00046055412,0.00031851282,0.0003030574,0.0005242938],"domain_scores_gemma":[0.99930125,0.000056716053,0.000043080203,0.0004106095,0.000053579843,0.0001347364],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028255337,0.0003068743,0.0002464219,0.0002042166,0.00016272852,0.00007427246,0.00018200399,0.00013081962,0.00007339618],"category_scores_gemma":[7.416412e-7,0.00032327583,0.0001498085,0.00030576353,0.000033590037,0.00014620634,0.0000014868739,0.000098522854,0.00010515694],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017572126,0.0002132124,0.0000074504337,0.0005622278,0.0010462914,0.000012685413,0.00025773392,0.7234243,0.0013789925,0.00797249,0.25758082,0.0073680505],"study_design_scores_gemma":[0.0009129591,0.00009051605,0.000027413484,0.00006465614,0.000091226415,0.000005699997,0.00052564853,0.024143225,0.04956751,0.000012009062,0.9240428,0.0005163079],"about_ca_topic_score_codex":0.00007658226,"about_ca_topic_score_gemma":0.000042360512,"teacher_disagreement_score":0.9890844,"about_ca_system_score_codex":0.00040306483,"about_ca_system_score_gemma":0.0000058787705,"threshold_uncertainty_score":0.9999219},"labels":[],"label_agreement":null},{"id":"W2100990002","doi":"10.1109/tpwrs.2008.2002296","title":"Security Coordinated Maintenance Scheduling in Deregulation Based on Genco Contribution to Unserved Energy","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scheduling (production processes); Deregulation; Reliability engineering; Schedule; Engineering; Computer science; Operations research; Operations management; Economics","score_opus":0.008196667815333517,"score_gpt":0.19509095127587334,"score_spread":0.18689428346053982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100990002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15654153,0.00009608702,0.83896005,0.00011696854,0.0027121957,0.0005327333,0.000058913272,0.00039465132,0.0005868859],"genre_scores_gemma":[0.9993005,0.00001732743,0.00007651673,0.00013008768,0.00001616334,0.0002498112,0.000009484854,0.000044953555,0.00015520399],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99801844,0.00016240678,0.0005993012,0.00041127368,0.00030800982,0.00050056033],"domain_scores_gemma":[0.9989751,0.00012538276,0.00006147729,0.00048200422,0.00018082582,0.000175239],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000380504,0.000303856,0.00041307992,0.00036589423,0.00015429831,0.00003385262,0.0001778016,0.00023281164,0.0000203652],"category_scores_gemma":[0.000022353375,0.00031225552,0.0001272876,0.00071861356,0.000038831786,0.00017622062,8.7511967e-7,0.000283474,0.00006988855],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013272701,0.00013298984,0.00008861655,0.00007113639,0.000023172039,0.000025998066,0.00021923943,0.9968304,0.0016490353,0.00047342022,0.0003079767,0.000045298922],"study_design_scores_gemma":[0.0015698023,0.00023924292,0.0009798046,0.00082743994,0.00001223058,0.000039410934,0.000099819226,0.9738298,0.016266957,0.00003180098,0.0055854525,0.0005182126],"about_ca_topic_score_codex":0.0003985879,"about_ca_topic_score_gemma":0.0003384869,"teacher_disagreement_score":0.84275895,"about_ca_system_score_codex":0.0006789968,"about_ca_system_score_gemma":0.00005483073,"threshold_uncertainty_score":0.99993294},"labels":[],"label_agreement":null},{"id":"W2101434476","doi":"10.1109/tpwrs.2011.2175256","title":"Implementation of a Modified Augmented Nodal Analysis Based Transformer Model into the Backward Forward Sweep Solver","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Transformer; Nodal analysis; Solver; Ground; Electrical impedance; Computer science; Distribution transformer; Three-phase; Algorithm; Voltage; Mathematical optimization; Electronic engineering; Engineering; Electrical engineering; Mathematics","score_opus":0.01836224768994126,"score_gpt":0.23998728492965188,"score_spread":0.2216250372397106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101434476","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.105380744,0.00003577448,0.8920835,0.000023936815,0.0005927949,0.00055259647,0.0003170376,0.00017205333,0.0008415127],"genre_scores_gemma":[0.9990318,0.000009096225,0.00061108824,0.000018896404,0.0000050027156,0.00019835944,0.000038215723,0.00004111219,0.00004643371],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837756,0.00005417364,0.0006150631,0.000250985,0.00038535503,0.00031685585],"domain_scores_gemma":[0.99922603,0.000031651234,0.00008185592,0.00044012466,0.00012577171,0.0000945485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026229155,0.00026808825,0.0003566154,0.0003423801,0.000120963916,0.000031337408,0.00021695733,0.00012857371,0.00023507864],"category_scores_gemma":[7.4592367e-7,0.00022490683,0.0004069866,0.0007441456,0.000051621853,0.0002509019,5.2709163e-7,0.00019603572,0.000029701114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009079015,0.000105788655,0.000031516014,0.000073851676,0.0010314102,8.217965e-7,0.0034227285,0.9891466,0.0054008937,0.00008584053,0.00013973225,0.0004700347],"study_design_scores_gemma":[0.00086438097,0.00014699946,0.00026431127,0.00002286111,0.0008471669,0.0000010661968,0.0011967929,0.93691826,0.059387993,0.00001248213,0.00008231655,0.00025539874],"about_ca_topic_score_codex":0.0012806744,"about_ca_topic_score_gemma":0.00059667067,"teacher_disagreement_score":0.89365107,"about_ca_system_score_codex":0.00020296252,"about_ca_system_score_gemma":0.000044994496,"threshold_uncertainty_score":0.91714346},"labels":[],"label_agreement":null},{"id":"W2102715725","doi":"10.1109/tpwrs.2003.811159","title":"Closure on \"Equilibrium of auction markets with unit commitment: the need for augmented pricing\"","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Auction Theory and Applications","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Closure (psychology); Mathematical economics; Economics; Computer science; Microeconomics; Operations research; Mathematics","score_opus":0.0563760824764624,"score_gpt":0.3198237421808395,"score_spread":0.26344765970437706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102715725","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06733442,0.000033612338,0.9231077,0.00063041586,0.0016049328,0.0015211636,0.0001386726,0.000070638605,0.005558485],"genre_scores_gemma":[0.98950857,0.0000025750737,0.000096459684,0.00009223953,0.0000145247795,0.00035732158,0.0000022816814,0.000022383547,0.009903624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975217,0.00051936373,0.0006263827,0.0003825112,0.0007336048,0.0002164465],"domain_scores_gemma":[0.9969808,0.00132482,0.00037629306,0.0008777967,0.0003581801,0.00008211954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001892718,0.0001933618,0.00028173748,0.00025349742,0.0004501478,0.000099853176,0.00036209586,0.00009563623,0.00019772921],"category_scores_gemma":[0.00005126077,0.00011454598,0.00016259156,0.0010005145,0.00015829316,0.00017279845,8.961027e-7,0.00018757967,0.00008662567],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009648315,0.0064678728,0.0012408006,0.00025467126,0.0019974913,0.000006959269,0.009518424,0.65185153,0.016168874,0.24605876,0.049452137,0.0073341574],"study_design_scores_gemma":[0.00930533,0.005102269,0.0021175283,0.00057780574,0.0005642416,0.00027660927,0.037662283,0.011188198,0.18030356,0.009937245,0.7414659,0.0014989858],"about_ca_topic_score_codex":0.000014810931,"about_ca_topic_score_gemma":0.000009899477,"teacher_disagreement_score":0.9230112,"about_ca_system_score_codex":0.000050809613,"about_ca_system_score_gemma":0.000062696614,"threshold_uncertainty_score":0.46710497},"labels":[],"label_agreement":null},{"id":"W2102954307","doi":"10.1109/59.871738","title":"Contingency ranking for on-line voltage stability assessment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Electric power system; Contingency; Reliability engineering; Ranking (information retrieval); Margin (machine learning); Stability (learning theory); Engineering; Voltage; Blackout; Power (physics); Computer science; Rank (graph theory); Line (geometry); Control theory (sociology); Control (management); Electrical engineering; Mathematics; Machine learning; Artificial intelligence","score_opus":0.02501040230318653,"score_gpt":0.26186979929983756,"score_spread":0.23685939699665104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102954307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015543579,0.00009119029,0.96232826,0.000036350393,0.0039055909,0.0013618235,0.00030532925,0.0006638388,0.015764039],"genre_scores_gemma":[0.9979585,0.000022759961,0.00034338085,0.00003682842,0.00001668529,0.00041560517,0.000009304949,0.00006059831,0.0011363531],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981225,0.00009693052,0.00067679124,0.0003968682,0.000321254,0.0003856669],"domain_scores_gemma":[0.9988852,0.00021652937,0.000051529005,0.0005968464,0.00010968032,0.00014018206],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006228797,0.0002994118,0.00041973914,0.000114702816,0.00021545842,0.00009954515,0.00017866165,0.00015196821,0.0011493034],"category_scores_gemma":[0.000005638322,0.00029192667,0.00021789985,0.00022732433,0.00003224467,0.00016114238,3.701683e-7,0.0002481625,0.000087399116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010453713,0.00034856025,0.000046100802,0.00031695052,0.00014338293,0.0000022218446,0.0007022065,0.9944159,0.00064790645,0.00020177958,0.000552385,0.002518116],"study_design_scores_gemma":[0.0027542482,0.0006231219,0.00017053094,0.0002735937,0.00007805792,0.000012694257,0.0004640436,0.9350816,0.005817775,0.000031509313,0.053793058,0.00089979],"about_ca_topic_score_codex":0.000028247397,"about_ca_topic_score_gemma":0.00003121191,"teacher_disagreement_score":0.9824149,"about_ca_system_score_codex":0.00028650096,"about_ca_system_score_gemma":0.00003863712,"threshold_uncertainty_score":0.99995327},"labels":[],"label_agreement":null},{"id":"W2103280697","doi":"10.1109/tpwrs.2008.2006996","title":"A Control Method of Grid-Connected PWM Voltage Source Inverters to Mitigate Fast Voltage Disturbances","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Control theory (sociology); Voltage source; Voltage controller; Voltage regulation; Voltage; Voltage regulator; Dropout voltage; Pulse-width modulation; Controller (irrigation); Disturbance voltage; Grid; Low-dropout regulator; Voltage optimisation; Voltage droop; Engineering; Computer science; Electronic engineering; Control (management); Electrical engineering; Mathematics","score_opus":0.004351907537667099,"score_gpt":0.19871607628893967,"score_spread":0.19436416875127258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103280697","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028817356,0.0004122461,0.9930646,0.00007810425,0.0019355495,0.00067035895,0.00020390737,0.00039528913,0.00035821786],"genre_scores_gemma":[0.9988366,0.000019574789,0.00044812917,0.00018006845,0.00004006149,0.00007506275,0.0000057643765,0.000040541076,0.0003541915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99857587,0.00006889948,0.0005063066,0.00028532403,0.00022941783,0.00033416058],"domain_scores_gemma":[0.99922514,0.00009846621,0.0000801438,0.00033432737,0.00009545392,0.00016646227],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018486333,0.00028465086,0.00048480192,0.00025102537,0.000087087086,0.00006378343,0.0001971886,0.00012871652,0.00003899667],"category_scores_gemma":[0.0000058214027,0.00027223,0.00017489014,0.00040058012,0.000022458025,0.00016382152,4.6079916e-7,0.00019489208,0.0000382487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084826235,0.00006726167,0.000008332298,0.00006178175,0.00015901422,0.000003964758,0.0008426476,0.9220768,0.06582,0.000020839903,0.00092972536,0.0099248],"study_design_scores_gemma":[0.0023229325,0.0004135315,0.00024545012,0.00026383824,0.00015478555,0.000026004544,0.0003764265,0.9604393,0.024463383,0.000008991661,0.010685081,0.00060025795],"about_ca_topic_score_codex":0.00013163532,"about_ca_topic_score_gemma":0.000041994652,"teacher_disagreement_score":0.9959549,"about_ca_system_score_codex":0.0000796958,"about_ca_system_score_gemma":0.00001569214,"threshold_uncertainty_score":0.999973},"labels":[],"label_agreement":null},{"id":"W2103457274","doi":"10.1109/tpwrs.2004.831280","title":"A Method for Synchronization of Power Electronic Converters in Polluted and Variable-Frequency Environments","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":569,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Converters; Synchronization (alternating current); Computer science; Harmonics; Control theory (sociology); Phase-locked loop; Electronic engineering; Power (physics); Engineering; Jitter; Artificial intelligence; Control (management); Telecommunications; Electrical engineering; Voltage","score_opus":0.003110601424939718,"score_gpt":0.18735345950421975,"score_spread":0.18424285807928004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103457274","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019389235,0.00081744,0.99604285,0.00001779861,0.00042221072,0.00055926776,0.000050409915,0.000054161403,0.00009695192],"genre_scores_gemma":[0.9955743,0.00012463257,0.0041107615,0.000016837515,0.0000034491834,0.000099113,0.000005480547,0.000030239282,0.000035199493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992196,0.000029446326,0.00028795877,0.00016074904,0.00008653493,0.00021568532],"domain_scores_gemma":[0.9997407,0.000034134056,0.00004212382,0.00013031144,0.000015501988,0.000037185553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013694642,0.0001339217,0.00020450605,0.00016526245,0.00003261638,0.000015687328,0.00005597429,0.00010203852,0.000018496457],"category_scores_gemma":[0.0000013833418,0.00014203697,0.00003786733,0.00017985333,0.000014722328,0.00012787522,2.8738796e-7,0.00009476542,0.0000025763286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027592376,0.00005809051,0.0000067251667,0.00006996695,0.000085624444,4.936984e-7,0.00033659342,0.9770135,0.021405907,0.00036317616,0.000006653175,0.0006256341],"study_design_scores_gemma":[0.0071287174,0.0005716989,0.00014997863,0.0003001416,0.00013243992,0.000037257527,0.00025917243,0.9735056,0.015879104,0.0003473892,0.0011357516,0.0005527404],"about_ca_topic_score_codex":0.000093170376,"about_ca_topic_score_gemma":0.00002503693,"teacher_disagreement_score":0.99363536,"about_ca_system_score_codex":0.00023819956,"about_ca_system_score_gemma":0.000031579802,"threshold_uncertainty_score":0.5792099},"labels":[],"label_agreement":null},{"id":"W2104690181","doi":"10.1109/tpwrs.2008.920729","title":"Electricity Markets Cleared by Merit Order—Part II: Strategic Offers and Market Power","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Clearance; Electricity market; Profit (economics); Market power; Economics; Linear programming; Electric power system; Order (exchange); Electricity; Integer programming; Nash equilibrium; Identification (biology); Scheme (mathematics); Computer science; Microeconomics; Mathematical optimization; Operations research; Power (physics); Mathematics; Engineering; Monopoly","score_opus":0.008896303743794999,"score_gpt":0.18282555306744513,"score_spread":0.17392924932365014,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104690181","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20663245,0.0022261988,0.7347267,0.00007899119,0.005680531,0.0015261756,0.00021410223,0.0016221928,0.047292624],"genre_scores_gemma":[0.9940602,0.0005850329,0.0000919771,0.000036516554,0.000017034174,0.00011866773,0.000009115146,0.00012033768,0.0049611074],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975659,0.00021197098,0.0006252346,0.0004960222,0.0004736088,0.00062725984],"domain_scores_gemma":[0.9989338,0.00011377163,0.00009666168,0.0004755759,0.00013446863,0.0002457123],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032792645,0.00045885766,0.00050682516,0.00033836276,0.00042600278,0.0000909351,0.0002097399,0.0003042289,0.00035568254],"category_scores_gemma":[0.000006638809,0.0004899367,0.00010420192,0.0009353518,0.00006679265,0.00032112875,0.0000016665506,0.00043743462,0.000051659623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017616,0.0024964605,0.0005167965,0.0016185987,0.0041897143,0.00041369902,0.006180726,0.29952168,0.039016463,0.0004472903,0.6426008,0.0012362021],"study_design_scores_gemma":[0.010975145,0.004330874,0.0012672205,0.001205614,0.00059098064,0.0044479887,0.0017959025,0.77540207,0.042595483,0.0000437623,0.14968072,0.0076642195],"about_ca_topic_score_codex":0.00007020019,"about_ca_topic_score_gemma":0.0000105202835,"teacher_disagreement_score":0.7874278,"about_ca_system_score_codex":0.00028368307,"about_ca_system_score_gemma":0.00006871602,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W2105059868","doi":"10.1109/tpwrs.2013.2291446","title":"Use of Mobile Unit Substations in Redundant Customer Delivery Systems","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability engineering; Transformer; Probabilistic logic; Markov chain; Computer science; Markov model; Mobile telephony; Engineering; Operations research; Telecommunications; Electrical engineering; Mobile radio; Artificial intelligence","score_opus":0.018393798882227058,"score_gpt":0.21319556549481544,"score_spread":0.19480176661258838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105059868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24208443,0.00045850786,0.7470671,0.000007712117,0.006627789,0.0009828795,0.00018090934,0.0003263441,0.0022643341],"genre_scores_gemma":[0.9985823,0.00008171903,0.000053007476,0.000007953343,0.000010119825,0.0003558334,0.0000037466316,0.00005301444,0.0008522806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99804425,0.00020279508,0.0008189347,0.00027699495,0.0002924297,0.0003646127],"domain_scores_gemma":[0.9987121,0.00030733855,0.00009678349,0.0006112339,0.00015412387,0.00011839118],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004462486,0.00025167462,0.00049631065,0.00040574872,0.0000667894,0.00006639367,0.00018973571,0.00017516619,0.000017488908],"category_scores_gemma":[0.000009556437,0.00024733253,0.00012588075,0.00052674464,0.00006922272,0.00033458084,9.725135e-7,0.00028044757,0.00014171792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000215485,0.0001239587,0.00008550253,0.0004594374,0.00006533015,0.0000041376047,0.00081734126,0.9944811,0.0027645996,0.0005993741,0.0004505612,0.00012713102],"study_design_scores_gemma":[0.002067283,0.000589179,0.00097469037,0.003365519,0.00014167992,0.00014322964,0.00403553,0.746187,0.010230134,0.000014432176,0.23069225,0.0015591106],"about_ca_topic_score_codex":0.0011999052,"about_ca_topic_score_gemma":0.00028854184,"teacher_disagreement_score":0.7564979,"about_ca_system_score_codex":0.00016899615,"about_ca_system_score_gemma":0.000036066114,"threshold_uncertainty_score":0.9999979},"labels":[],"label_agreement":null},{"id":"W2105192847","doi":"10.1109/59.932271","title":"Numerical experiments with an optimal power flow algorithm based on parametric techniques","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Parametric statistics; Mathematical optimization; Economic dispatch; Power flow; Electric power system; Relaxation (psychology); Mathematics; Computer science; Power (physics)","score_opus":0.010357149179130283,"score_gpt":0.23618546133140464,"score_spread":0.22582831215227436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105192847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0115517955,0.00006673945,0.981835,0.00001939669,0.0014684467,0.0006554799,0.00015621667,0.0012410437,0.003005868],"genre_scores_gemma":[0.98586655,0.000008263162,0.013479783,0.00004891512,0.00002607964,0.00032388445,0.0000268632,0.000116747135,0.00010291897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997891,0.00008882943,0.00040018867,0.00048605626,0.00059363653,0.0005402761],"domain_scores_gemma":[0.9988529,0.00006169133,0.000052419968,0.0006556715,0.00009870303,0.00027861315],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016232376,0.00045366344,0.00038076504,0.0004607908,0.00016526782,0.00014492703,0.00023873236,0.00024027114,0.00029276314],"category_scores_gemma":[0.0000025287454,0.00041904807,0.00012868908,0.00091114285,0.00004975415,0.00036799992,6.4900894e-7,0.00043483326,0.00022708191],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002923003,0.0008030411,0.000012250138,0.000021306858,0.00009821261,0.0000836324,0.00011869985,0.99331236,0.0004541157,0.0000050650606,0.000596822,0.004202209],"study_design_scores_gemma":[0.0008057278,0.0028429492,0.000049398,0.00013888728,0.00003746542,0.00009255542,0.00016221595,0.95781195,0.03166588,5.6191135e-7,0.0057271165,0.0006652731],"about_ca_topic_score_codex":0.0000387383,"about_ca_topic_score_gemma":0.0000010682487,"teacher_disagreement_score":0.97431475,"about_ca_system_score_codex":0.0004239037,"about_ca_system_score_gemma":0.000035139255,"threshold_uncertainty_score":0.99982613},"labels":[],"label_agreement":null},{"id":"W2105193302","doi":"10.1109/tpwrs.2009.2034526","title":"Approximate Voltage-Behind-Reactance Induction Machine Model for Efficient Interface With EMTP Network Solution","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reactance; Emtp; Discretization; Interface (matter); Computer science; Control theory (sociology); Voltage; Network model; Transient (computer programming); Engineering; Algorithm; Mathematics; Electrical engineering; Electric power system; Mathematical analysis; Physics; Artificial intelligence; Parallel computing; Power (physics)","score_opus":0.010958883681600362,"score_gpt":0.21960561911700474,"score_spread":0.20864673543540438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105193302","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0091458885,0.00034829107,0.9853109,0.000052037027,0.0020519923,0.0013311773,0.000045136712,0.000655036,0.0010595209],"genre_scores_gemma":[0.99823624,0.000008302014,0.00037661797,0.000024129446,0.000065510525,0.00020826593,0.000008592997,0.000061250925,0.001011103],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984183,0.00003972702,0.0004810516,0.00033794204,0.000294646,0.00042833987],"domain_scores_gemma":[0.9992433,0.000041526,0.000108748696,0.0003825881,0.00010591599,0.00011789481],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028241874,0.0003194209,0.00036635905,0.00014201384,0.00021297907,0.00012372041,0.00013188834,0.00016482823,0.000008305406],"category_scores_gemma":[0.0000014401207,0.0002809072,0.00012182335,0.00021295283,0.000017074488,0.0002236469,3.966731e-7,0.000248091,0.000026018117],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017777257,0.00007967084,0.0000013834613,0.00005589346,0.000070772665,7.009296e-7,0.0004282156,0.99255824,0.005033803,0.00010454485,0.00032020203,0.0011687785],"study_design_scores_gemma":[0.0011258936,0.00019649892,0.000014864242,0.0001827652,0.000046877758,0.000022008804,0.00006789683,0.99641234,0.0009542573,0.000015693475,0.0006503039,0.0003106002],"about_ca_topic_score_codex":0.000029048204,"about_ca_topic_score_gemma":0.000031370717,"teacher_disagreement_score":0.9890903,"about_ca_system_score_codex":0.00022089387,"about_ca_system_score_gemma":0.000022152624,"threshold_uncertainty_score":0.9999643},"labels":[],"label_agreement":null},{"id":"W2105645578","doi":"10.1109/59.918284","title":"A case-based Windows graphic package for the education and training of power system restoration","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Graphical user interface; Blackout; Expert system; Computer science; Electric power system; User interface; Software engineering; Power (physics); Artificial intelligence; Operating system","score_opus":0.028876901604387762,"score_gpt":0.2647612832350494,"score_spread":0.2358843816306616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105645578","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12649073,0.00045344475,0.8697389,0.000022488071,0.002182758,0.0005866631,0.000029540524,0.00019207333,0.00030342705],"genre_scores_gemma":[0.9983085,0.000012036267,0.0012387617,0.000006151242,0.00002374843,0.00026172795,0.000002581869,0.000041463732,0.000105061066],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910754,0.00008043736,0.0003470783,0.00015121733,0.0001524297,0.00016128842],"domain_scores_gemma":[0.9990569,0.00040674547,0.00005759496,0.00031810332,0.00009641088,0.00006427407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000470541,0.00015739449,0.00020764189,0.00023418064,0.00015070586,0.000053925465,0.000074877884,0.000106684565,0.0000050211424],"category_scores_gemma":[0.000009716627,0.00013106315,0.000092453476,0.00029920455,0.000024780293,0.00011629246,2.4238327e-7,0.0001341667,0.0000015157176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002579013,0.000024695448,0.000012310408,0.00023302704,0.000054329495,0.000005275821,0.001051082,0.99641407,0.001224934,0.00018173452,0.00006289747,0.00070987],"study_design_scores_gemma":[0.00076567475,0.00013575966,0.00008377832,0.0002665988,0.00007215097,0.00040283773,0.0041051,0.98913246,0.001646655,0.000004901623,0.0031591707,0.00022492417],"about_ca_topic_score_codex":0.00003891818,"about_ca_topic_score_gemma":0.000013333268,"teacher_disagreement_score":0.8718177,"about_ca_system_score_codex":0.000066446926,"about_ca_system_score_gemma":0.000039341663,"threshold_uncertainty_score":0.53446},"labels":[],"label_agreement":null},{"id":"W2106064111","doi":"10.1109/tpwrs.2011.2130545","title":"Price and Resource-Related Uncertainty in the Estimation of the Revenue of a Wind Farm","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Energy Research and Development","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Universidad de Sevilla; McGill University","keywords":"Revenue; Estimation; Economics; Wind power; Resource (disambiguation); Clearance; Econometrics; Electricity; Business; Microeconomics; Finance; Engineering; Computer science","score_opus":0.013487928172757607,"score_gpt":0.2030573014366333,"score_spread":0.1895693732638757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106064111","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93591213,0.00030923667,0.051672835,0.00005866569,0.0005524966,0.00054930174,0.000040312654,0.000035523328,0.010869479],"genre_scores_gemma":[0.9997748,0.000010681421,0.000029726962,0.000004171715,0.0000013385651,0.000017819644,3.925309e-7,0.0000073423976,0.00015374234],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937874,0.00007560803,0.00021445494,0.000065970446,0.0001630544,0.00010218657],"domain_scores_gemma":[0.99969643,0.00005279378,0.000031646254,0.00018020098,0.000017989467,0.00002092666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028308027,0.00006385512,0.00009921597,0.000074694086,0.00003425573,0.0000059221766,0.000113064576,0.00005017097,0.000008072131],"category_scores_gemma":[0.000004295679,0.00003963836,0.000029155104,0.00025508695,0.000040443618,0.000028450952,7.089164e-7,0.00013640666,0.000001757538],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036216534,0.000080156235,0.00007375561,0.0001518293,0.000074367825,0.0000022322542,0.0152375465,0.98162496,0.00096534705,0.00023559325,0.00017036848,0.0013476533],"study_design_scores_gemma":[0.00828339,0.0015414592,0.13854142,0.005866249,0.00025391008,0.00041233163,0.02663391,0.68294805,0.107376315,0.0011388652,0.025072278,0.0019318347],"about_ca_topic_score_codex":0.00034515938,"about_ca_topic_score_gemma":0.000068847876,"teacher_disagreement_score":0.2986769,"about_ca_system_score_codex":0.000029238296,"about_ca_system_score_gemma":0.000018153167,"threshold_uncertainty_score":0.16164052},"labels":[],"label_agreement":null},{"id":"W2106109980","doi":"10.1109/tpwrs.2012.2210574","title":"Options based reserve procurement strategy for wind generators - Using binomial trees","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Wind power; Procurement; Renewable energy; Electricity market; Activity-based costing; Electricity; Economics; Purchasing; Reserve requirement; Environmental economics; Computer science; Business; Operations management; Engineering; Electrical engineering","score_opus":0.04232265863417425,"score_gpt":0.25897634296121874,"score_spread":0.2166536843270445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106109980","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026151326,0.00067376,0.9658328,0.000010467751,0.005039704,0.0013983829,0.00012820408,0.00038982602,0.00037547143],"genre_scores_gemma":[0.99730253,0.000008102143,0.0019533075,0.000010093371,0.00012054148,0.00030459862,0.000013487333,0.00010183541,0.0001854775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982662,0.000104455255,0.0005202109,0.00024379138,0.00029823752,0.0005670967],"domain_scores_gemma":[0.99917185,0.000070922855,0.00008258736,0.000362819,0.00012100687,0.0001907883],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041479766,0.00029871482,0.00029340675,0.00036652098,0.00023507707,0.000114017515,0.00014929245,0.00019822847,0.000038385188],"category_scores_gemma":[0.0000037702978,0.00030789277,0.00014990654,0.00044956835,0.000018782139,0.00042285124,4.7894434e-7,0.00017241301,0.000023563873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023791767,0.0001224401,0.000039644863,0.00011428247,0.00011235216,5.268097e-7,0.00016025397,0.9912555,0.007398837,0.000084207255,0.00063567644,0.00005245789],"study_design_scores_gemma":[0.0011084891,0.00022482607,0.000040164825,0.00014245797,0.00012965527,0.000018583014,0.00016455575,0.95750964,0.03737059,0.0000017647156,0.0027689503,0.0005203312],"about_ca_topic_score_codex":0.0000655814,"about_ca_topic_score_gemma":0.000033006756,"teacher_disagreement_score":0.97115123,"about_ca_system_score_codex":0.0004847887,"about_ca_system_score_gemma":0.00008762468,"threshold_uncertainty_score":0.9999373},"labels":[],"label_agreement":null},{"id":"W2106652091","doi":"10.1109/59.871729","title":"Optimal power flow by a nonlinear complementarity method","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":65,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Nonlinear system; Power flow; Nonlinear complementarity problem; Mathematics; Newton's method; Complementarity (molecular biology); Complementarity theory; Mathematical optimization; Applied mathematics; Mathematical analysis; Control theory (sociology); Electric power system; Power (physics); Computer science; Physics","score_opus":0.009346318082738099,"score_gpt":0.24319921823229723,"score_spread":0.23385290014955915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106652091","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024455952,0.00018017602,0.9641113,0.00006133632,0.0023569723,0.00051311497,0.0026598824,0.00075340085,0.0049078586],"genre_scores_gemma":[0.98815894,0.000024163726,0.010442602,0.00005995634,0.000022746783,0.0001008216,0.00010641559,0.000084217216,0.0010001243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980481,0.00010403507,0.00052459515,0.00039137717,0.00039830344,0.0005335382],"domain_scores_gemma":[0.99914485,0.00006589333,0.000033434942,0.0004858036,0.00006085806,0.00020913771],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00027868198,0.00037409115,0.00037978476,0.000109976056,0.00018056344,0.00012060686,0.00024120607,0.00018717916,0.0037927316],"category_scores_gemma":[0.0000012498402,0.00040461394,0.00019377268,0.00031330087,0.000039649443,0.0002786222,8.659348e-7,0.0004506682,0.0010882659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008079809,0.00031283725,0.00000419691,0.000049753562,0.00024674213,0.000011770677,0.0003559488,0.9639873,0.0031855805,0.000012970701,0.029969351,0.0017827781],"study_design_scores_gemma":[0.0012143935,0.00038841102,0.000023955297,0.00007618416,0.000084656655,0.000075516495,0.00022381214,0.7012676,0.012342615,0.0000018954368,0.28355828,0.00074264477],"about_ca_topic_score_codex":0.00017248296,"about_ca_topic_score_gemma":0.000018310935,"teacher_disagreement_score":0.963703,"about_ca_system_score_codex":0.00030383343,"about_ca_system_score_gemma":0.00002181295,"threshold_uncertainty_score":0.99984056},"labels":[],"label_agreement":null},{"id":"W2106681897","doi":"10.1109/tpwrs.2008.2009430","title":"Development of Rule-Based Classifiers for Rapid Stability Assessment of Wide-Area Post-Disturbance Records","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":144,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University; Hydro-Québec","funders":"","keywords":"Phasor; Data mining; Fuzzy logic; Fuzzy rule; Stability (learning theory); Grid; Computer science; Artificial intelligence; Fault (geology); Fuzzy set; Pattern recognition (psychology); Machine learning; Electric power system; Mathematics","score_opus":0.024764935077259565,"score_gpt":0.2491889278610858,"score_spread":0.22442399278382621,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106681897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039844543,0.00008735386,0.9544902,0.000041525513,0.0019919118,0.0010352917,0.00030182945,0.00018009183,0.0020272406],"genre_scores_gemma":[0.9892465,0.0000039461916,0.010476277,0.000021655997,0.0000018582211,0.00015519305,0.000015849015,0.0000256614,0.00005306067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99793,0.00009076158,0.0010610723,0.0003007164,0.00034942757,0.0002680416],"domain_scores_gemma":[0.9986254,0.00020036915,0.00017937923,0.00053079356,0.0003481732,0.00011590325],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00063475984,0.0002558169,0.00053886336,0.00017305839,0.00009371606,0.000021892667,0.00018700851,0.00014714157,0.000091925496],"category_scores_gemma":[0.000013567155,0.00025057225,0.00020644363,0.00027485908,0.000047601432,0.000121375335,4.7164858e-7,0.000144839,0.0000017357521],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005989845,0.0021385888,0.0010992223,0.0034179632,0.00055004505,0.000001749436,0.0041417116,0.9498687,0.032293916,0.00026655162,0.0008361744,0.0047864136],"study_design_scores_gemma":[0.0059207496,0.001781956,0.01870677,0.001240516,0.0001861408,0.000007285451,0.003170981,0.73548293,0.21459173,0.000021653499,0.017082267,0.0018070142],"about_ca_topic_score_codex":0.00001158314,"about_ca_topic_score_gemma":0.00002786169,"teacher_disagreement_score":0.949402,"about_ca_system_score_codex":0.00037779473,"about_ca_system_score_gemma":0.00024749635,"threshold_uncertainty_score":0.99999464},"labels":[],"label_agreement":null},{"id":"W2106692551","doi":"10.1109/tpwrs.2004.831684","title":"Frequency-Response Analysis of Torsional Dynamics","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Control theory (sociology); Benchmark (surveying); Transfer function; Frequency domain; Torque; Nyquist stability criterion; Eigenvalues and eigenvectors; Computer science; Time domain; Electric power system; Engineering; Mathematics; Physics; Power (physics)","score_opus":0.006767067679273205,"score_gpt":0.20927494228220134,"score_spread":0.20250787460292813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106692551","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10036359,0.00008586349,0.895473,0.0000274539,0.001996132,0.00019053376,0.0003780194,0.00022544576,0.0012599842],"genre_scores_gemma":[0.9994015,0.0000064025235,0.0003335011,0.000009042638,0.0000017669303,0.00003182295,0.000009142977,0.00002424383,0.00018257718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869984,0.00009488685,0.0005103934,0.00020001626,0.00030464554,0.00019022856],"domain_scores_gemma":[0.99919724,0.00010112479,0.000057460587,0.00043331197,0.000102945494,0.00010792951],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032649108,0.00017704401,0.00038636578,0.00053631567,0.00006478048,0.0000257908,0.00015004678,0.00012957778,0.00017400434],"category_scores_gemma":[0.0000057396524,0.0001756012,0.0002644602,0.0010779664,0.000040556664,0.00011909383,4.3350587e-7,0.00013448465,0.000033803783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000413138,0.00009294695,0.000080279046,0.000034904926,0.0005793014,0.0000026077225,0.00041749963,0.99738973,0.00091211306,0.00041896067,0.000018556979,0.000011805434],"study_design_scores_gemma":[0.0014997626,0.00025624764,0.0034261155,0.00018026392,0.0008695564,0.000024929483,0.0010762984,0.9848172,0.006454874,0.00003737275,0.0005522306,0.0008051648],"about_ca_topic_score_codex":0.00013722022,"about_ca_topic_score_gemma":0.00019434205,"teacher_disagreement_score":0.8990379,"about_ca_system_score_codex":0.00044601018,"about_ca_system_score_gemma":0.000055332213,"threshold_uncertainty_score":0.7160809},"labels":[],"label_agreement":null},{"id":"W2106743450","doi":"10.1109/tpwrs.2005.860925","title":"Simultaneous Solution of Control System Equations in EMTP","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Computer Research Institute of Montréal; Université de Montréal; Polytechnique Montréal","funders":"","keywords":"Jacobian matrix and determinant; Nonlinear system; Control theory (sociology); Emtp; Computer science; Control system; Control engineering; Electric power system; Control (management); Mathematics; Engineering; Applied mathematics; Power (physics)","score_opus":0.005166996590263715,"score_gpt":0.1914606517058411,"score_spread":0.18629365511557738,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106743450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011554867,0.0002837664,0.97731227,0.000013795954,0.0021046617,0.00079255534,0.00008694193,0.00042213633,0.0074290307],"genre_scores_gemma":[0.99932486,0.0000023868276,0.000020540847,0.000004073534,0.00003090507,0.00014071696,0.000004843397,0.000043505566,0.00042818702],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99819607,0.00012734596,0.000862668,0.00020602859,0.00031893945,0.0002889655],"domain_scores_gemma":[0.9990488,0.0003511013,0.000109573404,0.00032370188,0.00010505256,0.00006175814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025573914,0.00021829888,0.00043820214,0.00036486037,0.0000727286,0.000049956045,0.00011825101,0.00017024616,0.0000224255],"category_scores_gemma":[0.000004701514,0.00022364936,0.00014118735,0.00036188762,0.000025269968,0.00015967045,2.6237697e-7,0.00016313585,0.000112174785],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028936662,0.00007063254,0.000027328273,0.0001460384,0.000047314523,0.000007736085,0.00010002713,0.9923367,0.00632686,0.0006772986,0.000055478667,0.00017563201],"study_design_scores_gemma":[0.0015573428,0.000057672547,0.000075315686,0.00021577011,0.000031907217,0.0000143418165,0.00031875278,0.99630916,0.0007936118,0.000004017397,0.00041592502,0.00020620604],"about_ca_topic_score_codex":0.0011560803,"about_ca_topic_score_gemma":0.00025770607,"teacher_disagreement_score":0.98776996,"about_ca_system_score_codex":0.00029656463,"about_ca_system_score_gemma":0.00002532179,"threshold_uncertainty_score":0.9120156},"labels":[],"label_agreement":null},{"id":"W2106824791","doi":"10.1109/tpwrs.2009.2030358","title":"Disco Operation Considering DG Units and Their Goodness Factors","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Abdulaziz City for Science and Technology","keywords":"Goodness of fit; Distributed generation; AC power; Scheduling (production processes); Power system simulation; Reliability engineering; Computation; Electric power system; Power factor; Mathematical optimization; Engineering; Power (physics); Computer science; Voltage; Mathematics; Electrical engineering; Renewable energy; Algorithm","score_opus":0.016330092670201246,"score_gpt":0.20640003714273084,"score_spread":0.1900699444725296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106824791","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3539908,0.0001659913,0.64231616,0.000030995536,0.002019897,0.0002469709,0.00014123073,0.00036467795,0.00072325114],"genre_scores_gemma":[0.99977964,0.000024592726,0.000021932776,0.000014546066,0.000013608022,0.00001700095,0.000017010738,0.00002739092,0.00008427197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914473,0.00003634003,0.0002586476,0.00020306649,0.00011951914,0.00023769712],"domain_scores_gemma":[0.99955404,0.000045397555,0.000024161789,0.00021824418,0.00005024635,0.000107888016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008290627,0.00024098845,0.0002180344,0.000108837856,0.0001519778,0.00014356455,0.00007326757,0.000115406474,0.000023727414],"category_scores_gemma":[0.000002884751,0.00021193191,0.000041958643,0.00021660475,0.000027221056,0.000354407,4.4398234e-7,0.00020317158,0.000030382023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039901188,0.00016875505,0.000111185785,0.00014705332,0.00021181292,0.000011905992,0.0049840505,0.9210148,0.06973239,0.00069765764,0.00085070776,0.0020297808],"study_design_scores_gemma":[0.00348625,0.001657247,0.0050409245,0.0010255224,0.00019792926,0.0002434716,0.014715429,0.4928923,0.458579,0.00008413495,0.018668422,0.0034093538],"about_ca_topic_score_codex":0.000026198944,"about_ca_topic_score_gemma":0.000012621423,"teacher_disagreement_score":0.64578885,"about_ca_system_score_codex":0.000109683926,"about_ca_system_score_gemma":0.000016952483,"threshold_uncertainty_score":0.86423326},"labels":[],"label_agreement":null},{"id":"W2107843419","doi":"10.1109/tpwrs.2010.2045773","title":"Potential-Function Based Control of a Microgrid in Islanded and Grid-Connected Modes","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":427,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Microgrid; Grid; Function (biology); Control theory (sociology); Voltage; Engineering; Control (management); Control engineering; Computer science; Mathematics; Electrical engineering","score_opus":0.0021696131930378916,"score_gpt":0.15856810253120876,"score_spread":0.15639848933817088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107843419","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12342839,0.00037423774,0.8733276,0.00002613841,0.0021343485,0.000376229,0.00008382806,0.00014463437,0.00010458484],"genre_scores_gemma":[0.99968815,0.00003675191,0.0001232443,0.000018647434,0.000022451748,0.00006288248,0.0000058147125,0.000026712176,0.000015364905],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992024,0.000040644652,0.00031605572,0.00016525114,0.00010560829,0.00017004945],"domain_scores_gemma":[0.9996127,0.00005077238,0.000044916615,0.00017872217,0.000060881885,0.000052031413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013279232,0.0001543775,0.00024829895,0.000253273,0.000041386917,0.000035547855,0.000058643105,0.00014676417,0.000044826564],"category_scores_gemma":[0.000002364534,0.00015068511,0.00006363806,0.00017267831,0.000027989376,0.00010883516,1.8338262e-7,0.00023311382,0.000005419362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001223536,0.0000651993,0.000053724456,0.0000641307,0.000054175187,0.000002056473,0.00006686095,0.7211457,0.27764836,0.000012910478,0.000037585094,0.0007269694],"study_design_scores_gemma":[0.002812885,0.00009721097,0.0004614689,0.00005703604,0.000057644185,0.000013438695,0.000060446917,0.9767892,0.019111188,0.0000052232444,0.0003494745,0.00018483166],"about_ca_topic_score_codex":0.00010888394,"about_ca_topic_score_gemma":0.00018488873,"teacher_disagreement_score":0.87625974,"about_ca_system_score_codex":0.000020118045,"about_ca_system_score_gemma":0.000016184673,"threshold_uncertainty_score":0.614476},"labels":[],"label_agreement":null},{"id":"W2108142964","doi":"10.1109/tpwrs.2009.2030409","title":"Enhancements to the Cumulant Method for Probabilistic Optimal Power Flow Studies","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Probabilistic logic; Cumulant; Monte Carlo method; Power flow; Limit (mathematics); Probability density function; Mathematical optimization; Computer science; Random variable; Power (physics); Flow (mathematics); Algorithm; Mathematics; Electric power system; Statistics; Artificial intelligence","score_opus":0.023784429845906868,"score_gpt":0.30245821845345217,"score_spread":0.2786737886075453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2108142964","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029814935,0.0003556718,0.9883598,0.00035271127,0.0050765024,0.0018220785,0.00038199447,0.00035317423,0.00031655142],"genre_scores_gemma":[0.988787,0.000016055217,0.010000504,0.00012066142,0.000037597565,0.00060312875,0.00000919429,0.00004131124,0.0003845348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983815,0.00006717636,0.0004458948,0.00034467425,0.00030020942,0.00046052856],"domain_scores_gemma":[0.9990367,0.00016105024,0.00004093015,0.00046682308,0.00017662159,0.00011782145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045076452,0.00031118165,0.00035552212,0.000113977585,0.00022231926,0.00008845602,0.00024248872,0.00009933113,0.00002398518],"category_scores_gemma":[0.0000212712,0.00024076075,0.00016389835,0.0002928264,0.00002139275,0.00017390001,0.0000011662331,0.0001965235,0.00015586229],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071575065,0.00010009856,1.4508122e-7,0.000059721104,0.0002024934,0.0000020751681,0.0009806305,0.9887096,0.0022225892,0.00013943831,0.006488238,0.0010233654],"study_design_scores_gemma":[0.0014525609,0.0024431648,0.00004170658,0.00042974713,0.0002881735,0.000049964503,0.0015911452,0.91296166,0.021567864,0.00007717295,0.05801126,0.0010855697],"about_ca_topic_score_codex":0.0000062255926,"about_ca_topic_score_gemma":0.000008545138,"teacher_disagreement_score":0.9858055,"about_ca_system_score_codex":0.00032524366,"about_ca_system_score_gemma":0.000020137923,"threshold_uncertainty_score":0.9817939},"labels":[],"label_agreement":null},{"id":"W2109107914","doi":"10.1109/tpwrs.2004.835638","title":"Pay-as-Bid versus Marginal Pricing—Part I: Strategic Generator Offers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Tsinghua University","keywords":"Payment; Generator (circuit theory); Economics; Marginal cost; Microeconomics; Electricity market; Yield (engineering); Electricity; Marginal utility; Econometrics; Power (physics); Finance; Engineering; Electrical engineering","score_opus":0.01594394157016829,"score_gpt":0.2158812997562269,"score_spread":0.19993735818605862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109107914","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03866385,0.00035054775,0.922338,0.00006412107,0.018240523,0.0007594337,0.000044916393,0.0011325345,0.018406073],"genre_scores_gemma":[0.99850273,0.00007536244,0.0001892813,0.000025722038,0.00007981972,0.00014922544,0.000007900338,0.00010960517,0.0008603448],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99801856,0.00006653077,0.000531451,0.00038736954,0.0004661619,0.0005298999],"domain_scores_gemma":[0.9990594,0.00005433242,0.000076966004,0.00050160475,0.00009670978,0.00021099232],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018457496,0.0003833474,0.00036202362,0.0003245038,0.00017392375,0.00015244055,0.00022699648,0.00023779315,0.00010597762],"category_scores_gemma":[0.0000026421073,0.00035758349,0.00014034192,0.0006593384,0.000030183503,0.0002554251,6.8020347e-7,0.0004074431,0.0006391641],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008601996,0.00009269238,0.000002239585,0.00011368492,0.00021557136,0.000035170448,0.00025397982,0.9951869,0.0025867762,0.00091463415,0.00045381094,0.000058492067],"study_design_scores_gemma":[0.044725806,0.010006808,0.000096907315,0.00380024,0.0015530831,0.002175412,0.007942368,0.50045615,0.3432288,0.0003681083,0.074669026,0.0109773055],"about_ca_topic_score_codex":0.00019420827,"about_ca_topic_score_gemma":0.000042500033,"teacher_disagreement_score":0.95983887,"about_ca_system_score_codex":0.0009640171,"about_ca_system_score_gemma":0.00014614376,"threshold_uncertainty_score":0.9998876},"labels":[],"label_agreement":null},{"id":"W2109781425","doi":"10.1109/tpwrs.2010.2046504","title":"A Power Oscillation Damping Control Scheme Based on Bang-Bang Modulation of FACTS Signals","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Royal Military College of Canada; École de Technologie Supérieure","funders":"","keywords":"Control theory (sociology); Robustness (evolution); Electric power system; Scheme (mathematics); Oscillation (cell signaling); Power control; Robust control; Control system; Bang–bang control; Modulation (music); Engineering; Power (physics); Computer science; Control (management); Physics; Optimal control; Mathematics","score_opus":0.00915613430599747,"score_gpt":0.21473835601950006,"score_spread":0.2055822217135026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109781425","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08512665,0.000023683555,0.9054741,0.00003922534,0.003992636,0.0007630017,0.00014330662,0.00036954624,0.0040678424],"genre_scores_gemma":[0.9994254,0.0000012192568,0.00029197472,0.000038642167,0.0000114069535,0.00007566668,0.00000871109,0.000056475677,0.000090473244],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980735,0.00012935535,0.0006939214,0.0003255882,0.0004867496,0.00029085323],"domain_scores_gemma":[0.9986862,0.00022109308,0.00014735917,0.0005894477,0.0002116224,0.00014426281],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000511365,0.0002909722,0.00041864955,0.00036570927,0.00012449292,0.00007240994,0.0001430216,0.000262826,0.00034631396],"category_scores_gemma":[0.00002383627,0.000290808,0.00018204516,0.0003588529,0.000040278068,0.00025355187,4.8873034e-7,0.00034423574,0.000058159116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051826446,0.00009758537,0.00022846997,0.00010421263,0.000052479412,9.082143e-7,0.00027678756,0.9549828,0.044027656,0.00007314847,0.00007102547,0.000033072723],"study_design_scores_gemma":[0.0011065144,0.00012207497,0.0013292762,0.00015660243,0.000018598472,0.000003560602,0.000080629805,0.98792607,0.008154323,0.0000033230554,0.0007935731,0.00030546472],"about_ca_topic_score_codex":0.00003302103,"about_ca_topic_score_gemma":0.000028234403,"teacher_disagreement_score":0.9142988,"about_ca_system_score_codex":0.0001224381,"about_ca_system_score_gemma":0.000047334328,"threshold_uncertainty_score":0.9999544},"labels":[],"label_agreement":null},{"id":"W2110167161","doi":"10.1109/59.852113","title":"Allocation of transmission losses to bilateral contracts in a competitive environment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":170,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Database transaction; Infinitesimal; Computer science; Component (thermodynamics); Set (abstract data type); Path (computing); Transmission loss; Transmission (telecommunications); Cover (algebra); Transaction cost; Argument (complex analysis); Electric power system; Power (physics); Economics; Mathematics; Microeconomics; Engineering; Telecommunications","score_opus":0.005060380664373658,"score_gpt":0.1880829258552522,"score_spread":0.18302254519087852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110167161","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0738568,0.00018898908,0.9206261,0.00004393471,0.00049074215,0.00083509734,0.000033050565,0.00015352613,0.0037717372],"genre_scores_gemma":[0.99894124,0.00012788663,0.00027795637,0.000015631094,0.0000054567004,0.00011173755,0.0000045444067,0.00003649032,0.0004790674],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99873537,0.00007572138,0.0005015645,0.0002102218,0.0002442077,0.0002329012],"domain_scores_gemma":[0.9995669,0.000055652697,0.000034683577,0.00022015153,0.000024242927,0.000098379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014502183,0.00018435446,0.00027700627,0.00028065214,0.000031737545,0.000021432623,0.00010267462,0.00011000666,0.0002636572],"category_scores_gemma":[7.866633e-7,0.00018898414,0.00005734587,0.00032190906,0.00001495882,0.00015128062,1.7800778e-7,0.0001344654,0.0001293629],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058635385,0.00013009435,0.000010357127,0.000059737282,0.00003346283,0.0000044376593,0.0012087319,0.98531497,0.010768952,0.000027790556,0.000048039943,0.0023348222],"study_design_scores_gemma":[0.0049753967,0.0016656527,0.0026224165,0.002872175,0.00012684058,0.00012874063,0.00064709113,0.6539404,0.28386968,0.000014197374,0.047332592,0.0018048182],"about_ca_topic_score_codex":0.00013294234,"about_ca_topic_score_gemma":0.00001706384,"teacher_disagreement_score":0.9250844,"about_ca_system_score_codex":0.00021826131,"about_ca_system_score_gemma":0.000016976632,"threshold_uncertainty_score":0.770655},"labels":[],"label_agreement":null},{"id":"W2110787312","doi":"10.1109/tpwrs.2005.857011","title":"Unit Commitment With Primary Frequency Regulation Constraints","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":197,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Scheduling (production processes); Frequency regulation; Automatic frequency control; Contingency; Control theory (sociology); Unit (ring theory); Electric power system; Computer science; Mathematical optimization; Operations research; Engineering; Operations management; Power (physics); Mathematics; Control (management); Telecommunications; Physics","score_opus":0.010582975704977007,"score_gpt":0.20039095280533722,"score_spread":0.1898079771003602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110787312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008305647,0.00076686306,0.91780984,0.000104462364,0.00408213,0.001093716,0.000106452986,0.0010629164,0.06666796],"genre_scores_gemma":[0.9974637,0.000016544082,0.00071868586,0.00006674234,0.000064009284,0.00027688843,0.000009562282,0.0000989786,0.0012848946],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997999,0.000108260945,0.0006191286,0.00033636112,0.0004944373,0.00044277176],"domain_scores_gemma":[0.9988267,0.0000936866,0.00009004425,0.0006950281,0.00012068058,0.00017390295],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025427132,0.00038724244,0.0004195439,0.00027213542,0.00014900885,0.00010271924,0.00024019253,0.0001901453,0.0002643608],"category_scores_gemma":[0.0000013002547,0.00035509455,0.000103694205,0.00031865094,0.00012760186,0.0004024305,4.992389e-7,0.00035653138,0.00045170757],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007729727,0.0003332545,0.00019552797,0.0003888533,0.0008688368,0.000047723024,0.0016042716,0.9673539,0.018099971,0.0022833955,0.0036277566,0.0051192497],"study_design_scores_gemma":[0.033409353,0.005395281,0.008684669,0.0082591,0.0016621307,0.0047820294,0.0043288325,0.43177724,0.088476636,0.000333408,0.39961505,0.013276251],"about_ca_topic_score_codex":0.00006309401,"about_ca_topic_score_gemma":0.00009522493,"teacher_disagreement_score":0.98915803,"about_ca_system_score_codex":0.00054730446,"about_ca_system_score_gemma":0.00006510174,"threshold_uncertainty_score":0.9998901},"labels":[],"label_agreement":null},{"id":"W2111502521","doi":"10.1109/tpwrs.2006.873414","title":"A Versatile Cluster-Based Real-Time Digital Simulator for Power Engineering Research","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":117,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Field-programmable gate array; Scalability; Computer science; Real-time simulation; Embedded system; Computation; Computer architecture simulator; MATLAB; Power system simulator for engineering; Computer hardware; Software; Power (physics); Simulation; Electric power system; Operating system","score_opus":0.011782821379561985,"score_gpt":0.2414288408372459,"score_spread":0.2296460194576839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2111502521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034641,0.000084400126,0.9478936,0.000043163644,0.0023866633,0.0018663716,0.00030545366,0.0011770877,0.011602234],"genre_scores_gemma":[0.9969135,0.0000011469087,0.00007689116,0.000008162642,0.0000787111,0.00037921904,0.000021878957,0.00014318657,0.0023772954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977174,0.00006539925,0.0006257963,0.00037717112,0.00057083485,0.0006434144],"domain_scores_gemma":[0.99832195,0.0007138071,0.00005179541,0.00052435853,0.00021852835,0.00016957751],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045215915,0.00033296176,0.00042104902,0.0004947364,0.00018663089,0.00041085575,0.00021021649,0.00023316848,0.00009752604],"category_scores_gemma":[0.000010970156,0.00034283893,0.0002603836,0.00042308721,0.000032836884,0.00036091916,0.0000010063757,0.00026397107,0.00043796358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008149959,0.00008460364,0.000004566262,0.00010958555,0.00007378401,0.0000035662538,0.00008765293,0.99021214,0.0062259384,0.000076603945,0.002969664,0.000070412585],"study_design_scores_gemma":[0.001855817,0.00019119038,0.000030702784,0.00013948933,0.000018074485,0.0000055510004,0.000087646156,0.9697934,0.0014766814,0.0000051784696,0.026027272,0.00036899542],"about_ca_topic_score_codex":0.00012319964,"about_ca_topic_score_gemma":0.0000057427533,"teacher_disagreement_score":0.9622725,"about_ca_system_score_codex":0.0003277682,"about_ca_system_score_gemma":0.00005192088,"threshold_uncertainty_score":0.99990237},"labels":[],"label_agreement":null},{"id":"W2112454818","doi":"10.1109/tpwrs.2007.901278","title":"Empirical Analysis of the Impact of 2003 Blackout on Security Values of U.S. Utilities and Electrical Equipment Manufacturing Firms","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Corporate Finance and Governance","field":"Business, Management and Accounting","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Electricity; Electric power industry; Electric power; Electrical equipment; Electric utility; Manufacturing; Electric power system; Engineering; Empirical research; Business; Power (physics); Electrical engineering; Marketing; Statistics; Mathematics","score_opus":0.019335887054734775,"score_gpt":0.26497717922947583,"score_spread":0.24564129217474107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112454818","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9837644,0.00010396277,0.014639212,0.000024294686,0.00030993417,0.00022523374,0.00005627555,0.0000141889295,0.0008624969],"genre_scores_gemma":[0.99973696,0.000017523173,0.0000030035405,0.000033986176,0.000018541732,0.0000044572935,0.0000011812424,0.0000096335025,0.0001747255],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987117,0.000022008986,0.0004997458,0.00019603346,0.0003713698,0.0001991089],"domain_scores_gemma":[0.9989976,0.0000922118,0.00045523205,0.0002966725,0.00014498152,0.000013258875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040905454,0.00015789182,0.00042492713,0.00033054693,0.0000707353,0.000023539265,0.00014553376,0.000075020274,0.000042440322],"category_scores_gemma":[0.000011944067,0.000106477106,0.00026939024,0.0010600158,0.00008948312,0.00017541295,0.000003171352,0.00013736957,0.0000028070433],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003468224,0.0047187475,0.78087497,0.0021112224,0.0075847274,0.000025982705,0.0051761437,0.17714854,0.0048860577,0.0019072929,0.008560753,0.0035373115],"study_design_scores_gemma":[0.0006768746,0.0002232854,0.9680359,0.00027150824,0.00063443836,0.000001815522,0.00038202785,0.010437153,0.01832732,0.00010559865,0.00063893397,0.00026518275],"about_ca_topic_score_codex":0.0025192313,"about_ca_topic_score_gemma":0.00016929289,"teacher_disagreement_score":0.18716086,"about_ca_system_score_codex":0.00006149024,"about_ca_system_score_gemma":0.000029952686,"threshold_uncertainty_score":0.43420103},"labels":[],"label_agreement":null},{"id":"W2113369277","doi":"10.1109/tpwrs.2010.2045663","title":"Optimal Allocation of ESS in Distribution Systems With a High Penetration of Wind Energy","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":466,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Sizing; Installation; Energy storage; Distributed generation; Reliability engineering; Electricity; Computer science; Environmental economics; Renewable energy; Environmental science; Engineering; Electrical engineering; Power (physics); Economics","score_opus":0.003358343786777668,"score_gpt":0.17515674847098514,"score_spread":0.17179840468420748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113369277","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24430338,0.000077909746,0.75302655,0.0000051200495,0.0017614772,0.00036682174,0.000074233096,0.00009157395,0.0002929484],"genre_scores_gemma":[0.9995123,0.000018970699,0.00017755371,9.294419e-7,0.00001549701,0.00009831436,0.00004981226,0.0000431508,0.00008343215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983683,0.00008541675,0.00071543123,0.0002285494,0.0003763655,0.00022594215],"domain_scores_gemma":[0.9990755,0.000070878385,0.00020043911,0.00037549037,0.0002159236,0.000061769715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027717187,0.00021725925,0.0003793951,0.00031968555,0.000037679612,0.000033863886,0.00014584756,0.00022813604,0.000009857367],"category_scores_gemma":[0.0000038858816,0.00021225047,0.00005020659,0.00072257506,0.000039539143,0.0002835596,5.122767e-7,0.00022588922,0.000003035911],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051365852,0.00011426731,0.00007721996,0.00020236995,0.000062755935,0.0000016146239,0.00019109232,0.97031486,0.027702324,0.0011900545,0.000032006883,0.000060064114],"study_design_scores_gemma":[0.0016963002,0.0006122477,0.00120486,0.000646664,0.00008773122,0.00008998542,0.00034187932,0.84197074,0.15252662,0.000003146141,0.00028768007,0.0005321313],"about_ca_topic_score_codex":0.0011274001,"about_ca_topic_score_gemma":0.00025822586,"teacher_disagreement_score":0.75520897,"about_ca_system_score_codex":0.0001489224,"about_ca_system_score_gemma":0.000064664884,"threshold_uncertainty_score":0.8655323},"labels":[],"label_agreement":null},{"id":"W2113631301","doi":"10.1109/tpwrs.2006.887891","title":"A New System Splitting Scheme Based on the Unified Stability Control Framework","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Quantum chaos and dynamical systems","field":"Physics and Astronomy","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Scheme (mathematics); Stability (learning theory); Control theory (sociology); Electric power system; Computer science; Control (management); Control system; Oscillation (cell signaling); Mathematical optimization; Engineering; Mathematics; Power (physics); Physics","score_opus":0.012348163772241695,"score_gpt":0.23097051519985928,"score_spread":0.2186223514276176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113631301","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037240565,0.000021833632,0.9501875,0.00020103161,0.0026225287,0.0010546743,0.00011437432,0.0001802911,0.008377179],"genre_scores_gemma":[0.99898267,7.587076e-8,0.00029790727,0.0000960976,0.00019266567,0.00008510709,0.0000027281696,0.000045032673,0.00029774618],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99742895,0.00026706705,0.0007350904,0.00047887437,0.0005310244,0.00055896357],"domain_scores_gemma":[0.9972925,0.0012151618,0.00023744797,0.0008625225,0.00010550077,0.00028684904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013841322,0.00034661547,0.00045879037,0.00009601468,0.00042844412,0.00017075604,0.00030389836,0.00016555082,0.00032848667],"category_scores_gemma":[0.0000070775145,0.00023940224,0.0003337836,0.00037936826,0.00005129395,0.000077377925,0.0000011110959,0.0006373001,0.00020539729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016762052,0.0018534103,0.006863071,0.0006203221,0.0011252915,0.000032155738,0.0020936253,0.06376594,0.004055658,0.9144401,0.0010873596,0.0023868494],"study_design_scores_gemma":[0.0063363914,0.0011378109,0.0011809708,0.0037349507,0.00029060687,0.000013020323,0.01804515,0.9496381,0.007835854,0.0008712596,0.00874312,0.002172713],"about_ca_topic_score_codex":0.0013805358,"about_ca_topic_score_gemma":0.000014965904,"teacher_disagreement_score":0.9617421,"about_ca_system_score_codex":0.0001917368,"about_ca_system_score_gemma":0.000108540364,"threshold_uncertainty_score":0.976254},"labels":[],"label_agreement":null},{"id":"W2113956231","doi":"10.1109/tpwrs.2011.2130850","title":"Investigation of the 2.5 Beta Methodology","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; BETA (programming language); Beta distribution; Econometrics; Event (particle physics); Value (mathematics); Statistics; Computer science; Mathematics; Engineering; Power (physics)","score_opus":0.06732011776826904,"score_gpt":0.22392868727152057,"score_spread":0.15660856950325153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113956231","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050299037,0.00016246417,0.93443584,0.000027224733,0.008004682,0.000354861,0.000027678154,0.00016950413,0.0065187253],"genre_scores_gemma":[0.9991645,0.000009212107,0.0003844086,0.000021794476,0.0000059606664,0.00005586356,2.0602066e-7,0.00002046497,0.0003375699],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989786,0.00021595243,0.000355467,0.00014097124,0.00013995616,0.000169012],"domain_scores_gemma":[0.9992501,0.00009879393,0.000062271116,0.00047988276,0.00005686697,0.000052046064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042976858,0.00012643346,0.0002233081,0.00007333544,0.00005289742,0.0000062633876,0.00022485701,0.000120136574,0.000037084366],"category_scores_gemma":[0.0000051311945,0.00009240319,0.0001192284,0.000220301,0.000097843396,0.000085727115,7.809833e-7,0.00017659711,0.000036185957],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048267338,0.0006702177,0.004951321,0.0071611414,0.0033551357,0.000028675782,0.1330818,0.37983355,0.39682508,0.05166961,0.017512798,0.004428011],"study_design_scores_gemma":[0.0008295512,0.00031192353,0.0053000515,0.0007367023,0.00016375541,0.00011520552,0.0016063256,0.00871056,0.9718823,0.0006793453,0.008989464,0.000674841],"about_ca_topic_score_codex":0.00018948603,"about_ca_topic_score_gemma":0.000041719533,"teacher_disagreement_score":0.9488655,"about_ca_system_score_codex":0.000050964787,"about_ca_system_score_gemma":0.000020929847,"threshold_uncertainty_score":0.37680927},"labels":[],"label_agreement":null},{"id":"W2114287382","doi":"10.1109/tpwrs.2009.2023274","title":"Wind Turbines Capacity Factor Modeling—A Novel Approach","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Energy Research and Development","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Turbine; Wind power; Matching (statistics); Capacity factor; Engineering; Marine engineering; Power (physics); Computer science; Automotive engineering; Mathematics; Electrical engineering; Aerospace engineering; Statistics","score_opus":0.03434093557805561,"score_gpt":0.21963128013315525,"score_spread":0.18529034455509963,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114287382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07958972,0.000099060555,0.91188395,0.0000298328,0.0012296926,0.00020149113,0.00005151733,0.00039006645,0.0065246983],"genre_scores_gemma":[0.99840933,0.000016768203,0.0007926905,0.000025872057,0.00003230209,0.000026415144,0.0000034510801,0.000029688936,0.00066349347],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998716,0.000018076988,0.00027124153,0.00023613565,0.00035791288,0.0004006517],"domain_scores_gemma":[0.9994258,0.000016326616,0.000014385572,0.00028359858,0.0000590643,0.00020082107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009172561,0.00022931905,0.0002295141,0.0001880079,0.00011480597,0.000082969054,0.00016502231,0.00013665073,0.000030370704],"category_scores_gemma":[0.0000016214981,0.00020461317,0.000093939394,0.00022470165,0.000015968886,0.0001698795,3.8486922e-7,0.00029752607,0.0000656503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012704447,0.00012546661,0.0000014306415,0.000033842163,0.0000622648,0.000001831022,0.00040162166,0.9940252,0.0047164806,0.000052020387,0.00027772048,0.0002894586],"study_design_scores_gemma":[0.0006710728,0.00012359353,0.00012007814,0.000068788795,0.000010903243,0.000046939924,0.00017980982,0.9880951,0.0070571243,0.000014668612,0.0031089003,0.0005030234],"about_ca_topic_score_codex":0.00006772557,"about_ca_topic_score_gemma":0.0000051374145,"teacher_disagreement_score":0.9188196,"about_ca_system_score_codex":0.00013543446,"about_ca_system_score_gemma":0.000029644674,"threshold_uncertainty_score":0.83438826},"labels":[],"label_agreement":null},{"id":"W2114925916","doi":"10.1109/tpwrs.2007.907457","title":"Strategic Bidding for Price-Taker Hydroelectricity Producers","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Bidding; Hydroelectricity; Electricity market; Electricity; Stochastic programming; Stochastic modelling; Stochastic process; Process (computing); Electricity generation; Electric power system; Operations research; Economics; Computer science; Industrial organization; Microeconomics; Mathematical optimization; Engineering; Power (physics); Finance; Mathematics; Electrical engineering","score_opus":0.016467329951924903,"score_gpt":0.2266777537310644,"score_spread":0.2102104237791395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2114925916","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01135493,0.0003477487,0.9715881,0.000017909173,0.004756186,0.0014228165,0.00002432001,0.0009253597,0.009562638],"genre_scores_gemma":[0.99832994,0.000023448867,0.00052654045,0.000020421488,0.00004888512,0.00019008193,0.0000051196917,0.00010816456,0.00074737926],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979662,0.000040600877,0.0005960905,0.00038758616,0.00032842177,0.00068115146],"domain_scores_gemma":[0.9990421,0.00018241363,0.00009424445,0.0003929419,0.0001323959,0.00015590007],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007623301,0.00031411438,0.00032755738,0.0005033272,0.00018480374,0.000101323814,0.00018789807,0.00021178309,0.000023835839],"category_scores_gemma":[0.000006785965,0.00032587707,0.00014295938,0.0009619304,0.00001730633,0.00023002215,3.3053786e-7,0.00027924904,0.00005979032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000076051874,0.00012919672,0.000008696546,0.00032658086,0.00025326794,0.000008680733,0.000496162,0.9829137,0.013277673,0.00042731393,0.0014215128,0.00066120375],"study_design_scores_gemma":[0.0018483545,0.0007491422,0.000042473253,0.00028499585,0.00014924578,0.00016465153,0.00055153796,0.87131643,0.11338294,0.00005021396,0.010082757,0.0013772739],"about_ca_topic_score_codex":0.00002231736,"about_ca_topic_score_gemma":0.00001708978,"teacher_disagreement_score":0.986975,"about_ca_system_score_codex":0.0005115992,"about_ca_system_score_gemma":0.0000522334,"threshold_uncertainty_score":0.99991935},"labels":[],"label_agreement":null},{"id":"W2115097216","doi":"10.1109/tpwrs.2010.2050344","title":"Neural-Network Security-Boundary Constrained Optimal Power Flow","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Electric power system; Artificial neural network; Context (archaeology); Mathematical optimization; Constraint (computer-aided design); Benchmark (surveying); Representation (politics); Differentiable function; Boundary (topology); Process (computing); Function (biology); Power (physics); Artificial intelligence; Mathematics","score_opus":0.005808650260617126,"score_gpt":0.20288562459947862,"score_spread":0.19707697433886148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115097216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025351677,0.00016829256,0.92979306,0.000083692,0.025547057,0.0007332826,0.00026253128,0.0013174273,0.016742995],"genre_scores_gemma":[0.9982618,0.000007979839,0.00087628985,0.00006203431,0.000041032657,0.00011323721,0.000010000095,0.0000886445,0.00053899625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99777293,0.00012373687,0.0006807391,0.00043198327,0.00039041613,0.0006001923],"domain_scores_gemma":[0.9985868,0.0001319068,0.00006942819,0.00076560135,0.00013490823,0.00031138182],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00044859995,0.0004216086,0.00047706408,0.00016493614,0.00030544653,0.0002469599,0.00029335136,0.00034191582,0.0011547141],"category_scores_gemma":[0.000007072315,0.00042484535,0.0002386285,0.000412657,0.00014999644,0.00030708397,0.0000016696057,0.000880682,0.00024946692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003113865,0.00010683347,0.000026078686,0.00008423072,0.00013166782,0.000018247787,0.0010066129,0.993735,0.000680541,0.00022205108,0.0038718397,0.00008571611],"study_design_scores_gemma":[0.0010726777,0.0001396678,0.000058491936,0.000085864456,0.000050490744,0.0002449491,0.00041827853,0.9107448,0.0007915308,0.000016553773,0.08550577,0.0008709489],"about_ca_topic_score_codex":0.000014700245,"about_ca_topic_score_gemma":0.00008010619,"teacher_disagreement_score":0.9729101,"about_ca_system_score_codex":0.000088884364,"about_ca_system_score_gemma":0.00006584258,"threshold_uncertainty_score":0.99982035},"labels":[],"label_agreement":null},{"id":"W2115642022","doi":"10.1109/tpwrs.2010.2066992","title":"Real-Time Nonlinear Transient Simulation Based on Optimized Transmission Line Modeling","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transient (computer programming); Nonlinear system; Transmission line; Electric power system; Computer science; Electric power transmission; Real-time simulation; Electronic engineering; Transmission system; Bridge (graph theory); Engineering; Transmission (telecommunications); Power (physics); Control theory (sociology); Simulation; Electrical engineering","score_opus":0.010166536690933063,"score_gpt":0.23374911810304294,"score_spread":0.22358258141210988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115642022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028754424,0.00001889635,0.9613342,0.00006192171,0.0026643374,0.0010266807,0.00006299385,0.0010729956,0.005003536],"genre_scores_gemma":[0.9975943,0.00001330029,0.0015229475,0.000028557932,0.00008271418,0.000107088876,0.000025001282,0.00013467223,0.0004914293],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975857,0.00012373675,0.0008416337,0.00044339593,0.00059107016,0.00041442816],"domain_scores_gemma":[0.99858224,0.00029642106,0.000074187614,0.00061563036,0.00014752997,0.00028399963],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041053817,0.0004444726,0.0005396664,0.00040483245,0.00020834498,0.00014587151,0.00019154433,0.0003739389,0.00036533375],"category_scores_gemma":[0.0000049610007,0.00041296447,0.00032240717,0.0003234334,0.0000225901,0.0002406763,2.807462e-7,0.00056120194,0.00028448107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002530569,0.00015392902,2.2155952e-7,0.00006171169,0.000051198338,0.0000041699864,0.00021497614,0.95045537,0.04765822,0.0000054093625,0.00002098081,0.0011207293],"study_design_scores_gemma":[0.0025795584,0.00017635235,0.0000019844783,0.00017656195,0.000054628767,0.0000035028447,0.00003597763,0.9927167,0.0023033614,0.0000015226003,0.0015321239,0.00041769014],"about_ca_topic_score_codex":0.00008704167,"about_ca_topic_score_gemma":0.0000060787106,"teacher_disagreement_score":0.9688399,"about_ca_system_score_codex":0.0001019468,"about_ca_system_score_gemma":0.00004763943,"threshold_uncertainty_score":0.9998322},"labels":[],"label_agreement":null},{"id":"W2116182650","doi":"10.1109/tpwrs.2004.831254","title":"Real-Time Simulation of Voltage Source Converters Based on Time Average Method","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Synchronism; Converters; Real Time Digital Simulator; Computer science; Harmonics; Real-time simulation; Controller (irrigation); Voltage; Voltage source; Electronic engineering; Control theory (sociology); Power (physics); Engineering; Electric power system; Simulation; Electrical engineering; Control (management)","score_opus":0.006548292166195835,"score_gpt":0.22722465017945684,"score_spread":0.220676358013261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116182650","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041394327,0.0000181796,0.9793139,0.000024913585,0.00063603674,0.000674781,0.000063159576,0.0006227402,0.014506843],"genre_scores_gemma":[0.99318033,0.0000026940222,0.00021651515,0.000044817545,0.000044856577,0.00004866792,0.000009913889,0.00008991765,0.006362255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980023,0.00020085332,0.00071416324,0.0003100425,0.00046908238,0.00030359626],"domain_scores_gemma":[0.99856,0.00051229395,0.00013820251,0.00054614444,0.000096834236,0.00014650749],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00043088425,0.00032403218,0.00053092797,0.0003659383,0.00009229659,0.000065867534,0.00016158685,0.0002118685,0.00065614627],"category_scores_gemma":[0.0000048974503,0.00032458626,0.00024660627,0.0002757244,0.0000235595,0.00022231987,4.927056e-7,0.00019673708,0.0011570388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008420222,0.00008171977,0.0000020792677,0.000064181375,0.00009589078,0.0000015217494,0.0002813262,0.96606505,0.031195149,0.000007525089,0.00033496608,0.0017863824],"study_design_scores_gemma":[0.0012917795,0.00013171625,0.000019614527,0.00013529076,0.00004164688,0.000003247962,0.000034914607,0.9860232,0.005208026,7.853839e-7,0.006819165,0.0002906413],"about_ca_topic_score_codex":0.00009467928,"about_ca_topic_score_gemma":0.00000271265,"teacher_disagreement_score":0.9890409,"about_ca_system_score_codex":0.00020834507,"about_ca_system_score_gemma":0.000026757973,"threshold_uncertainty_score":0.9999206},"labels":[],"label_agreement":null},{"id":"W2116988740","doi":"10.1109/tpwrs.2009.2038783","title":"Long-Term Effects of Feed-In Tariffs and Carbon Taxes on Distribution Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Renewable energy; Environmental economics; Investment (military); Context (archaeology); Electricity; Term (time); Distribution (mathematics); Carbon tax; Economics; Distributed generation; Feed-in tariff; Production (economics); Industrial organization; Emissions trading; Electricity generation; Microeconomics; Natural resource economics; Operations research; Energy policy; Power (physics); Engineering; Greenhouse gas; Electrical engineering; Mathematics","score_opus":0.003070718246184033,"score_gpt":0.18505268739152445,"score_spread":0.1819819691453404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116988740","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5601479,0.00047403265,0.4294039,0.00000653969,0.008151134,0.0010006257,0.000073518466,0.00024364617,0.00049870304],"genre_scores_gemma":[0.99948937,0.000052434072,0.000009736822,0.0000021754104,0.000023430157,0.00018928298,0.000010991393,0.000056581695,0.0001659921],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99844223,0.00008183263,0.00053390954,0.00030345755,0.00031101357,0.00032757554],"domain_scores_gemma":[0.9991074,0.00019939238,0.0001064251,0.0004137633,0.00006417222,0.00010885325],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024414863,0.00029308125,0.00044063723,0.00032135096,0.000055983965,0.0000652475,0.00013328656,0.0002984608,0.0000029515352],"category_scores_gemma":[0.000010498058,0.00029396694,0.00006589181,0.00042778888,0.00003679884,0.00013066869,8.3640646e-7,0.00045904555,0.000009018997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024170427,0.00081927446,0.005195943,0.0068001277,0.0005308756,0.00011025754,0.0016159199,0.84159327,0.1405265,0.0012115072,0.000411189,0.000943435],"study_design_scores_gemma":[0.0059568123,0.0018611208,0.023012368,0.0055087493,0.00032833478,0.00041855883,0.00021184648,0.65300184,0.30691,0.000008710663,0.0004871577,0.0022944896],"about_ca_topic_score_codex":0.00041215628,"about_ca_topic_score_gemma":0.00014843277,"teacher_disagreement_score":0.4393415,"about_ca_system_score_codex":0.00017160599,"about_ca_system_score_gemma":0.000022864158,"threshold_uncertainty_score":0.99995124},"labels":[],"label_agreement":null},{"id":"W2117181535","doi":"10.1109/tpwrs.2004.825823","title":"Assessment of Transmission Congestion Cost and Locational Marginal Pricing in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Computer science; Electricity market; Transmission (telecommunications); Electric power transmission; Reliability (semiconductor); Transmission system; Marginal cost; Transmission network; Network topology; Power system simulation; Electric power system; Reliability engineering; Electricity; Network congestion; Computer network; Engineering; Power (physics); Telecommunications; Economics; Electrical engineering","score_opus":0.00631179647743849,"score_gpt":0.2235933090035715,"score_spread":0.217281512526133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117181535","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019624906,0.0002354749,0.97439873,0.000032397253,0.00046486175,0.0007522459,0.000021165184,0.00011031082,0.0043599335],"genre_scores_gemma":[0.99862754,0.00013184918,0.0010287489,0.000006556048,0.0000053102394,0.000108869026,0.000005037226,0.000028527002,0.000057569043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986868,0.00009792534,0.00046318394,0.00022375709,0.0002985054,0.00022984634],"domain_scores_gemma":[0.9995023,0.000111097834,0.00007571428,0.00013947664,0.00009406926,0.000077329976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034378987,0.00018724064,0.0002907671,0.00041917118,0.000058276422,0.000028342723,0.00007382094,0.00012265434,0.00002502855],"category_scores_gemma":[0.0000028223085,0.00019971005,0.000041633586,0.00057293527,0.000029163228,0.00018202646,4.1009787e-7,0.0002550503,0.0000021843352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039551727,0.00016518382,0.00025535625,0.0002484846,0.000055773355,0.0000057351126,0.00032355232,0.9915936,0.005440771,0.001239625,0.000019495832,0.0006128909],"study_design_scores_gemma":[0.004434438,0.000584898,0.037401192,0.001999273,0.00008155414,0.00019677012,0.00035755805,0.93970597,0.013952816,0.000042863376,0.0005390049,0.00070368015],"about_ca_topic_score_codex":0.0001174637,"about_ca_topic_score_gemma":0.00003135475,"teacher_disagreement_score":0.97900265,"about_ca_system_score_codex":0.0005718202,"about_ca_system_score_gemma":0.000099869634,"threshold_uncertainty_score":0.81439394},"labels":[],"label_agreement":null},{"id":"W2118448684","doi":"10.1109/tpwrs.2007.901281","title":"A Multistage Algorithm for Identification of Nonlinear Aggregate Power System Loads","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Control Systems and Identification","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Nonlinear system; Polynomial; Discretization; Electric power system; Algorithm; System identification; Mathematical optimization; Control theory (sociology); Identification (biology); Mathematics; Estimation theory; Power (physics); Computer science; Data modeling","score_opus":0.007396669508544366,"score_gpt":0.22339504241608846,"score_spread":0.2159983729075441,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118448684","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012868592,0.00043435572,0.9765626,0.0000060838374,0.0075221006,0.0013244168,0.0004928652,0.00039552993,0.00039340983],"genre_scores_gemma":[0.99765724,0.000009506068,0.0006908122,0.0000025574375,0.00004962442,0.00020644304,0.000014805261,0.00007220013,0.0012968259],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99786055,0.000038273236,0.0011378622,0.00030687955,0.00032813108,0.00032830538],"domain_scores_gemma":[0.9987123,0.00011375467,0.00024683788,0.0005392895,0.00027864895,0.00010919668],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009026553,0.00024087503,0.0003919613,0.00035245402,0.00012397529,0.000086043525,0.0001844238,0.00018908644,0.000009117166],"category_scores_gemma":[0.000004441515,0.00025058576,0.00022579172,0.00029856098,0.000030201809,0.00020369803,5.775669e-7,0.00013911426,0.000077154116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034650185,0.0009787172,0.000030731786,0.00480906,0.0017073108,0.0000369619,0.004780659,0.17571458,0.74043816,0.0013007836,0.0020849167,0.067771606],"study_design_scores_gemma":[0.0018439239,0.00017315298,0.00023252798,0.00052069617,0.00012857957,0.000051778487,0.0018824872,0.8597341,0.12318425,0.0000022649524,0.011702069,0.0005441337],"about_ca_topic_score_codex":0.00014258646,"about_ca_topic_score_gemma":0.00004243807,"teacher_disagreement_score":0.98478866,"about_ca_system_score_codex":0.00025005822,"about_ca_system_score_gemma":0.000019332043,"threshold_uncertainty_score":0.99999464},"labels":[],"label_agreement":null},{"id":"W2120431356","doi":"10.1109/tpwrs.2009.2023263","title":"Composite System Adequacy Assessment Incorporating Large-Scale Wind Energy Conversion Systems Considering Wind Speed Correlation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind speed; Wind power; Reliability (semiconductor); Monte Carlo method; Electric power system; Scale (ratio); Transmission system; Reliability engineering; Engineering; Transmission (telecommunications); Computer science; Automotive engineering; Power (physics); Meteorology; Mathematics; Statistics; Electrical engineering","score_opus":0.007928361752800176,"score_gpt":0.20937675400592046,"score_spread":0.20144839225312028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120431356","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046387184,0.00056206086,0.928499,0.00004163366,0.01574494,0.0009324152,0.00013183111,0.0012141033,0.0064868266],"genre_scores_gemma":[0.99901587,0.000018353025,0.00019140467,0.000040539348,0.00007556686,0.000017382261,0.000021942553,0.00007790573,0.0005410465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965255,0.00030164537,0.001215524,0.00061110203,0.00066722854,0.000678976],"domain_scores_gemma":[0.99828196,0.0001822471,0.00030306194,0.0007423616,0.00019495968,0.00029540173],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00073861756,0.00055627775,0.0008272406,0.00035022933,0.00043938932,0.00028135884,0.00027428477,0.00038528608,0.000014284766],"category_scores_gemma":[0.000003511461,0.0005720049,0.00023056961,0.00046670635,0.000053755757,0.0005780553,0.0000031547386,0.00053426065,0.00010086271],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043419805,0.00014466344,0.00012568462,0.0006448005,0.00013753907,0.000046492096,0.0006839335,0.9879918,0.0083232885,0.0012922989,0.0005049902,0.00006105784],"study_design_scores_gemma":[0.0016773165,0.00031163185,0.00028647442,0.0024168687,0.00011040424,0.00032268092,0.0041327816,0.9825456,0.002406068,0.000008233537,0.004957691,0.0008242397],"about_ca_topic_score_codex":0.00023411534,"about_ca_topic_score_gemma":0.000020138623,"teacher_disagreement_score":0.9526287,"about_ca_system_score_codex":0.0010596705,"about_ca_system_score_gemma":0.00008156966,"threshold_uncertainty_score":0.9996731},"labels":[],"label_agreement":null},{"id":"W2120640238","doi":"10.1109/tpwrs.2003.821620","title":"Order Reduction of the Dynamic Model of a Linear Weakly Periodic System–Part I: General Methodology","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"LTI system theory; Linearization; Reduction (mathematics); Control theory (sociology); Mathematics; Linear system; Model order reduction; Convergence (economics); Singular value decomposition; Applied mathematics; Gauss–Seidel method; Gauss; Electric power system; Computer science; Mathematical optimization; Nonlinear system; Algorithm; Mathematical analysis; Iterative method; Power (physics); Physics; Control (management)","score_opus":0.10129837277519098,"score_gpt":0.3259367602345679,"score_spread":0.22463838745937692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120640238","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049404394,0.00012812085,0.9443982,0.00010869457,0.005167255,0.00041009838,0.000074548705,0.000057933274,0.0002507173],"genre_scores_gemma":[0.9855325,0.000006368722,0.0124464715,0.000006954713,0.00001747847,0.000045325287,4.5298634e-7,0.000021103919,0.0019233464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971343,0.0004276064,0.0010159276,0.00038869193,0.0008117054,0.00022171771],"domain_scores_gemma":[0.9979919,0.0002572862,0.0003471458,0.0008807379,0.00045200982,0.00007091261],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001911631,0.00018918722,0.0005219212,0.00028127222,0.00017779667,0.00002689999,0.00054935645,0.00018565245,0.000020046684],"category_scores_gemma":[0.00011796195,0.0001194464,0.00024827098,0.00084294146,0.00021281894,0.00011537156,0.0000033145454,0.00022723642,0.0000269611],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003904853,0.000077892146,0.000001048371,0.000053830106,0.000043502478,5.4241576e-7,0.00077051827,0.9742456,0.021935368,0.0027033219,0.000056535988,0.00007276868],"study_design_scores_gemma":[0.00066358835,0.00022860814,0.000021387981,0.0002993791,0.00010221212,0.00016320641,0.0018147444,0.9833776,0.012150235,0.000749379,0.00018871526,0.00024098194],"about_ca_topic_score_codex":0.00018039718,"about_ca_topic_score_gemma":0.00001412893,"teacher_disagreement_score":0.9361281,"about_ca_system_score_codex":0.00016844583,"about_ca_system_score_gemma":0.0002881052,"threshold_uncertainty_score":0.48708826},"labels":[],"label_agreement":null},{"id":"W2120843541","doi":"10.1109/tpwrs.2009.2032659","title":"Including Magnetic Saturation in Voltage-Behind-Reactance Induction Machine Model for EMTP-Type Solution","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Silicon Carbide Semiconductor Technologies","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Emtp; Reactance; Variable bitrate; Control theory (sociology); Nonlinear system; Saturation (graph theory); Computer science; Voltage; Mathematics; Engineering; Electric power system; Physics; Electrical engineering; Artificial intelligence; Telecommunications","score_opus":0.03153884277016495,"score_gpt":0.25259012115472296,"score_spread":0.22105127838455801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120843541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3475701,0.00087503425,0.6468916,0.00008095531,0.0027479057,0.0007110349,0.000030152882,0.0009111135,0.00018212957],"genre_scores_gemma":[0.9992204,0.000078562654,0.00027644692,0.000025524065,0.00002311567,0.00010571032,0.000008872414,0.000043474294,0.00021791212],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987268,0.000021435095,0.0004280433,0.00030634474,0.0001918494,0.00032552335],"domain_scores_gemma":[0.99942136,0.000047092333,0.00006063747,0.00035206493,0.00007425599,0.000044595097],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018268281,0.00025351884,0.00026458385,0.00046079486,0.00010001398,0.000057242574,0.00015858405,0.00030208085,0.00000645827],"category_scores_gemma":[0.000015043277,0.00027617576,0.00007488587,0.00036092362,0.00002499008,0.0004369719,7.4484194e-7,0.00040593697,0.000013698277],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032939945,0.000039075858,0.000009712986,0.000036490637,0.000011547003,0.0000010911725,0.00042846444,0.44848245,0.54732674,0.0000851525,0.00017843522,0.003367869],"study_design_scores_gemma":[0.00050237664,0.00018341395,0.00013440938,0.00010559176,0.000020216816,0.000015974414,0.00016380328,0.94060844,0.057652917,0.00019203743,0.0001255422,0.00029527416],"about_ca_topic_score_codex":0.000050584567,"about_ca_topic_score_gemma":0.00014270568,"teacher_disagreement_score":0.6516503,"about_ca_system_score_codex":0.00046192989,"about_ca_system_score_gemma":0.000023545914,"threshold_uncertainty_score":0.99996907},"labels":[],"label_agreement":null},{"id":"W2122597238","doi":"10.1109/tpwrs.2009.2036264","title":"A Stochastic Programming Model for a Day-Ahead Electricity Market With Real-Time Reserve Shortage Pricing","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Mathematical optimization; Electricity pricing; Electricity; Scheduling (production processes); Electricity market; Computation; Computer science; Power system simulation; Economic shortage; Integer programming; Stochastic programming; Heuristic; Time limit; Electric power system; Limit (mathematics); Operations research; Economics; Power (physics); Engineering; Mathematics; Algorithm","score_opus":0.007904079102977066,"score_gpt":0.21270874033599127,"score_spread":0.20480466123301422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122597238","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010645669,0.000043582346,0.9825746,0.0000119154765,0.001096745,0.0025833813,0.00006355657,0.0011139789,0.0018666085],"genre_scores_gemma":[0.9904106,0.000006781488,0.005611851,0.000005696955,0.00003325552,0.0012195262,0.000009574317,0.0001730611,0.002529628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977071,0.0000730639,0.0005341502,0.0004981046,0.0004439644,0.0007436043],"domain_scores_gemma":[0.9985533,0.00027414193,0.00011967442,0.00063655095,0.00021532188,0.00020105737],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007281311,0.00042537219,0.00049294205,0.00045003276,0.0002463261,0.00016082895,0.00027965882,0.00027603828,0.00001858952],"category_scores_gemma":[0.000018114082,0.00040222317,0.00013476903,0.0007986344,0.000031612286,0.00033577115,0.0000010536444,0.0005526191,0.000014106345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012503518,0.000106235246,0.00000585085,0.00021733764,0.00017540787,0.000004889369,0.00057296566,0.9866206,0.01085163,0.000038864782,0.0008177311,0.0004634572],"study_design_scores_gemma":[0.0006681383,0.0002566216,0.000005212237,0.000208835,0.000099204044,0.00006142332,0.00003364085,0.9965743,0.0014257547,0.0000037314492,0.00020654268,0.00045663625],"about_ca_topic_score_codex":0.00011964657,"about_ca_topic_score_gemma":0.00024139753,"teacher_disagreement_score":0.97976494,"about_ca_system_score_codex":0.00025832272,"about_ca_system_score_gemma":0.00011100826,"threshold_uncertainty_score":0.99984294},"labels":[],"label_agreement":null},{"id":"W2123432750","doi":"10.1109/tpwrs.2007.901288","title":"Synchronous Machine Modeling Based on Shifted Frequency Analysis","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Sichuan University of Science and Engineering","keywords":"Phasor; Component (thermodynamics); Waveform; Time domain; Frequency domain; Computer science; Emtp; Time–frequency analysis; Electric power system; Power (physics); Control theory (sociology); Electronic engineering; Engineering; Artificial intelligence; Telecommunications; Physics","score_opus":0.009314539044771093,"score_gpt":0.21717834401151917,"score_spread":0.20786380496674808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2123432750","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008268707,0.0001890612,0.9804561,0.000017717408,0.0023923097,0.00039964935,0.00013063474,0.0011788785,0.0069669117],"genre_scores_gemma":[0.9990515,0.000005276363,0.00067965535,0.00004427586,0.000007775312,0.000044234173,0.00001374817,0.000073374096,0.00008015022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979869,0.000091821355,0.00070073234,0.00038012298,0.0004232042,0.00041723117],"domain_scores_gemma":[0.99880093,0.00012236816,0.000054724685,0.0007102816,0.0000980534,0.00021364383],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006521848,0.00032065093,0.0004564847,0.00079154427,0.00016197166,0.00007728068,0.00019122314,0.00019516349,0.0001693887],"category_scores_gemma":[0.0000051608104,0.0003145283,0.00030681826,0.001223568,0.000021150943,0.00012565166,3.8821125e-7,0.000315043,0.00010491021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028937953,0.00012064073,0.000114737086,0.00005736036,0.00028597857,0.000009890719,0.000193403,0.9989781,0.00007928602,0.000058766094,0.0000121916455,0.00006072072],"study_design_scores_gemma":[0.00038901324,0.00007833898,0.00006703846,0.000049663082,0.00015744948,0.0000036280157,0.000116694944,0.9983864,0.00032589707,0.0000023863072,0.00011256512,0.00031093438],"about_ca_topic_score_codex":0.00025256237,"about_ca_topic_score_gemma":0.00030318936,"teacher_disagreement_score":0.9907828,"about_ca_system_score_codex":0.00039243713,"about_ca_system_score_gemma":0.000030990308,"threshold_uncertainty_score":0.9999307},"labels":[],"label_agreement":null},{"id":"W2124543688","doi":"10.1109/tpwrs.2009.2032758","title":"Reliability Evaluation Considering Wind and Hydro Power Coordination","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":111,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Reliability engineering; Reliability (semiconductor); Monte Carlo method; Wind speed; Engineering; Automotive engineering; Power (physics); Electrical engineering; Meteorology","score_opus":0.011996562118138748,"score_gpt":0.2292736440673071,"score_spread":0.21727708194916837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124543688","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37175706,0.00068957335,0.61016536,0.00025346194,0.00530375,0.0014162535,0.000038953753,0.0006793613,0.009696255],"genre_scores_gemma":[0.99955,0.00002165995,0.00008055428,0.000051034054,0.000012302286,0.0000528266,0.0000019393221,0.000026463234,0.00020321217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824923,0.00014272238,0.00049796904,0.0003860635,0.0004059281,0.0003180881],"domain_scores_gemma":[0.9990162,0.000118712655,0.000061422164,0.00048436548,0.00018506621,0.00013423411],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000988576,0.00026091214,0.00032114374,0.00016203556,0.00015048822,0.000095586365,0.00010318436,0.00018631821,0.000064014006],"category_scores_gemma":[0.00002979649,0.0002593711,0.00008866197,0.00023007744,0.000056417244,0.00038430744,6.906453e-7,0.00026748792,0.000053586413],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010815957,0.00037077023,0.0000764562,0.00041162557,0.00017757148,0.00001465932,0.0036364815,0.95950204,0.026184794,0.000730315,0.00316433,0.0056228116],"study_design_scores_gemma":[0.00583202,0.0016825754,0.010716816,0.00178803,0.00038933114,0.0005149716,0.002402052,0.89099574,0.03396897,0.0015603633,0.047243424,0.002905702],"about_ca_topic_score_codex":0.000028671397,"about_ca_topic_score_gemma":0.00000724974,"teacher_disagreement_score":0.62779295,"about_ca_system_score_codex":0.0003045009,"about_ca_system_score_gemma":0.000035343193,"threshold_uncertainty_score":0.9999859},"labels":[],"label_agreement":null},{"id":"W2124906995","doi":"10.1109/tpwrs.2004.826804","title":"Experimental Studies With a Generalized Neuron-Based Power System Stabilizer","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Artificial neural network; Electric power system; Control theory (sociology); Computer science; Artificial neuron; Nonlinear system; Stabilizer (aeronautics); Control engineering; Range (aeronautics); Power (physics); Control (management); Engineering; Artificial intelligence","score_opus":0.01706123611747992,"score_gpt":0.23517864991902096,"score_spread":0.21811741380154104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124906995","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11182545,0.0011099662,0.87772936,0.000039415747,0.004767778,0.0010353175,0.000083944986,0.0014054172,0.0020033407],"genre_scores_gemma":[0.9987819,0.0000054627194,0.00045592652,0.000047899455,0.000007203658,0.0004649357,0.000002923039,0.00010962911,0.00012412349],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9977905,0.00015153339,0.0006241817,0.00048331326,0.0005044653,0.00044597013],"domain_scores_gemma":[0.9987744,0.00007448377,0.00007894239,0.0007044583,0.00016221814,0.00020550501],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022840497,0.0004708303,0.00060963165,0.00022388337,0.00021763856,0.00010776592,0.00019501943,0.00013762391,0.00006951788],"category_scores_gemma":[0.000002894256,0.00038904356,0.00017384138,0.00040267422,0.000100151134,0.00021266552,0.0000010798128,0.0002274579,0.00009544954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011361909,0.00020470639,0.000010226888,0.00026413842,0.00021440967,0.000027734919,0.0018834599,0.9947014,0.002261734,0.00021374236,0.00010216255,0.0000027074357],"study_design_scores_gemma":[0.043355893,0.006582812,0.00021777696,0.0052392404,0.0006730783,0.0009615851,0.084468685,0.38724852,0.44657865,0.000009227431,0.016725311,0.007939207],"about_ca_topic_score_codex":0.00005197788,"about_ca_topic_score_gemma":0.000025330737,"teacher_disagreement_score":0.88695645,"about_ca_system_score_codex":0.0008771401,"about_ca_system_score_gemma":0.00008586764,"threshold_uncertainty_score":0.9998562},"labels":[],"label_agreement":null},{"id":"W2124937476","doi":"10.1109/tpwrs.2007.901482","title":"Generalized Estimation of Average Displaced Emissions by Wind Generation","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Renewable energy; Wind power; Environmental economics; Electricity generation; Electric power system; Greenhouse gas; Work (physics); Estimation; Engineering; Environmental science; Computer science; Power (physics); Economics; Systems engineering; Electrical engineering","score_opus":0.008066432887448313,"score_gpt":0.22102131133006067,"score_spread":0.21295487844261235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124937476","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059364274,0.00026821723,0.93523216,0.000011569272,0.0027223022,0.0005143695,0.00006130916,0.00030628667,0.00151951],"genre_scores_gemma":[0.9977625,0.000025229996,0.00074499985,0.000010542376,0.000022030388,0.00002972325,0.000036898262,0.00006224652,0.0013058464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833053,0.00007391432,0.00069819775,0.00023278614,0.0003658137,0.0002987742],"domain_scores_gemma":[0.99923104,0.00008026979,0.00011947501,0.0003497202,0.000087950364,0.00013156289],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041182849,0.00023823616,0.00029638584,0.00029627947,0.00012196467,0.000044508342,0.00012302458,0.00020743784,0.00006129167],"category_scores_gemma":[0.0000066477955,0.00024524552,0.00009496639,0.0005021745,0.000019105015,0.0002435373,4.6830246e-7,0.00017623788,0.000027221338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018186814,0.00006126631,0.0000034482216,0.000059396174,0.00006608098,0.0000016850986,0.00031202845,0.90745986,0.088465184,0.000059702306,0.0031233528,0.0003698039],"study_design_scores_gemma":[0.00066035474,0.0000833743,0.000014077858,0.0000869064,0.00003661935,0.000020932524,0.000034291304,0.8346023,0.16291696,0.0000017612509,0.0012769985,0.0002654248],"about_ca_topic_score_codex":0.000051462026,"about_ca_topic_score_gemma":0.000007823346,"teacher_disagreement_score":0.9383982,"about_ca_system_score_codex":0.00023174229,"about_ca_system_score_gemma":0.000026258687,"threshold_uncertainty_score":1},"labels":[],"label_agreement":null},{"id":"W2125135194","doi":"10.1109/tpwrs.2012.2213309","title":"DG allocation for benefit maximization in distribution networks","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":293,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Distributed generation; Renewable energy; Installation; Maximization; Reliability engineering; Reliability (semiconductor); Computer science; Mathematical optimization; Upgrade; Reduction (mathematics); Integer programming; Power (physics); Engineering; Mathematics; Electrical engineering","score_opus":0.0066939806316053075,"score_gpt":0.1936410292391505,"score_spread":0.18694704860754519,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125135194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02339356,0.00012170687,0.9717346,0.000058552196,0.0026526737,0.0012714614,0.00021792534,0.00034235773,0.00020716495],"genre_scores_gemma":[0.99833214,0.00003193422,0.00013375947,0.000012236798,0.000025597998,0.0009546456,0.00033259092,0.00004423152,0.00013287528],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882656,0.000023694622,0.00042373044,0.00023450513,0.00015543007,0.00033605986],"domain_scores_gemma":[0.99942815,0.00005773486,0.000047049038,0.00024899087,0.00013755227,0.00008049934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014584218,0.0002056887,0.00019820446,0.0001183679,0.00008704677,0.00010698138,0.000107114276,0.00020750205,0.00004987897],"category_scores_gemma":[0.0000042321417,0.00022987647,0.00008058843,0.00035046917,0.00001706339,0.00042250293,4.6448554e-7,0.00017537114,0.000108981796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014725738,0.000061387895,0.000026475553,0.000046018362,0.000023247552,2.767691e-7,0.00004683982,0.996324,0.0005847684,0.0003092959,0.0014661439,0.0010967908],"study_design_scores_gemma":[0.00055766344,0.00010047184,0.0009471596,0.00008515677,0.000018508426,0.0000047411977,0.00007851831,0.99476385,0.0016270261,0.00003739252,0.0015159865,0.00026355192],"about_ca_topic_score_codex":0.000123799,"about_ca_topic_score_gemma":0.00004488408,"teacher_disagreement_score":0.9749386,"about_ca_system_score_codex":0.00044139975,"about_ca_system_score_gemma":0.000010619584,"threshold_uncertainty_score":0.9374091},"labels":[],"label_agreement":null},{"id":"W2125214211","doi":"10.1109/tpwrs.2005.852147","title":"A Survey of Load Control Programs for Price and System Stability","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":115,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Electric power system; Load management; Control (management); Computer science; Load regulation; Stability (learning theory); Control system; Demand side; Reliability engineering; Operations research; Power (physics); Economics; Environmental economics; Engineering; Electrical engineering; Voltage","score_opus":0.017335303402588154,"score_gpt":0.20852324337537573,"score_spread":0.19118793997278757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125214211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052511558,0.0003922717,0.9429326,0.00001250285,0.0016638595,0.0011849536,0.00013483402,0.00033419576,0.00083319936],"genre_scores_gemma":[0.99925727,0.0000066508264,0.00014751377,0.000004224828,0.000016424745,0.00045001745,0.0000024380586,0.00003573609,0.000079699945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988582,0.00007730552,0.0004036637,0.00021125186,0.00021620447,0.00023335814],"domain_scores_gemma":[0.9992355,0.0001557345,0.000051326137,0.00032954148,0.00014948117,0.000078423334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070613425,0.00017013196,0.00031364325,0.000075139185,0.000048893267,0.000034690962,0.00009856157,0.00007893478,0.000005623298],"category_scores_gemma":[0.0000046364203,0.00016513803,0.000066929184,0.00016648596,0.000030067806,0.00010119575,5.128394e-7,0.00008016704,0.000007745396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016660645,0.00027017176,0.0005807602,0.0020128326,0.0005692828,0.0000011189749,0.0005442276,0.9917051,0.00079401466,0.00014834573,0.0004930843,0.0027144374],"study_design_scores_gemma":[0.0034465403,0.00041044413,0.0052161263,0.00034272924,0.00015062788,0.000013784556,0.00057002116,0.96899676,0.004889566,6.578405e-7,0.015388538,0.00057422963],"about_ca_topic_score_codex":0.00035207198,"about_ca_topic_score_gemma":0.00045430986,"teacher_disagreement_score":0.94674575,"about_ca_system_score_codex":0.0002765783,"about_ca_system_score_gemma":0.000020027132,"threshold_uncertainty_score":0.6734134},"labels":[],"label_agreement":null},{"id":"W2125428223","doi":"10.1109/59.852154","title":"Contingency screening for steady-state security analysis by using FFT and artificial neural networks","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Fast Fourier transform; Artificial neural network; Computer science; Contingency table; Preprocessor; Artificial intelligence; Machine learning; Data mining; Reliability engineering; Algorithm; Engineering","score_opus":0.01539544410440372,"score_gpt":0.23375660017044847,"score_spread":0.21836115606604475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125428223","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0900905,0.00040714364,0.90713185,0.000009708218,0.0010070085,0.0005380553,0.00027765165,0.00026979865,0.00026829852],"genre_scores_gemma":[0.99940133,0.00002031302,0.00026426878,0.000015058498,0.000011558727,0.00005630466,0.000013157952,0.000040593455,0.00017741822],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984501,0.000107741354,0.00056861964,0.00033511478,0.00017513998,0.00036326077],"domain_scores_gemma":[0.99935514,0.00009199515,0.000059444475,0.0002749495,0.00006976281,0.0001486941],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000329621,0.00024858452,0.0004357968,0.00016803625,0.00025337632,0.0001640186,0.000094702176,0.00012986762,0.00012787832],"category_scores_gemma":[0.000002134056,0.00026333285,0.0001949614,0.00050158973,0.000037958587,0.00020566513,5.3240865e-7,0.0001833976,0.000002714239],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044407996,0.00003547165,0.00006988208,0.000048189584,0.00033025318,9.2502347e-7,0.0006053131,0.9978442,0.00014220625,0.0000035680855,0.00009965666,0.0007759028],"study_design_scores_gemma":[0.0002809889,0.000038632257,0.000023867438,0.000023308312,0.00020981864,0.0000049041046,0.00017879248,0.9980494,0.000089318346,0.000002126633,0.00083705754,0.00026180453],"about_ca_topic_score_codex":0.0001441948,"about_ca_topic_score_gemma":0.0001231171,"teacher_disagreement_score":0.9093108,"about_ca_system_score_codex":0.00006163007,"about_ca_system_score_gemma":0.000007252551,"threshold_uncertainty_score":0.9999819},"labels":[],"label_agreement":null},{"id":"W2125428312","doi":"10.1109/tpwrs.2009.2036709","title":"A Hybrid Network Model for Small Signal Stability Analysis of Power Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"University of Moratuwa","keywords":"Admittance parameters; Admittance; Control theory (sociology); Transient (computer programming); Electric power system; Time domain; Stability (learning theory); SIGNAL (programming language); Frequency domain; Small-signal model; Modal analysis; Converters; Electronic engineering; Modal; Transmission system; Transmission (telecommunications); Computer science; Engineering; Power (physics); Electrical impedance; Voltage; Physics; Electrical engineering; Finite element method","score_opus":0.018581894247730667,"score_gpt":0.21656651658501574,"score_spread":0.1979846223372851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125428312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039868295,0.0001484974,0.9504388,0.000008277711,0.0054053394,0.0013119015,0.0011765164,0.0004022728,0.0012400778],"genre_scores_gemma":[0.99839205,0.000004815535,0.0008360126,0.000009748528,0.000009716053,0.00039744927,0.000021461443,0.000069636524,0.00025908716],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972982,0.00013119829,0.0011660921,0.00050613086,0.00037504794,0.0005233211],"domain_scores_gemma":[0.997883,0.0003044105,0.00018126388,0.001006675,0.00038362082,0.00024102605],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010762665,0.00038874408,0.00096810743,0.00036850045,0.00016055255,0.00010381526,0.0003270158,0.00024534468,0.00015951814],"category_scores_gemma":[0.000010699147,0.0003822066,0.00059928524,0.000756179,0.00007658074,0.00016518666,0.0000016911065,0.0003802612,0.00001059735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006350786,0.00015149354,0.00009759696,0.00024887983,0.0009864481,7.7273427e-7,0.00048110491,0.99609184,0.0012720829,0.0003083017,0.0002859162,0.000012049025],"study_design_scores_gemma":[0.00042182152,0.000077859724,0.00005255523,0.00004364273,0.00045627193,0.0000056532435,0.00015203051,0.9967838,0.0009005379,0.000008511499,0.00073976564,0.00035753028],"about_ca_topic_score_codex":0.00009765438,"about_ca_topic_score_gemma":0.00028521105,"teacher_disagreement_score":0.95852375,"about_ca_system_score_codex":0.00013972746,"about_ca_system_score_gemma":0.00008031167,"threshold_uncertainty_score":0.99986297},"labels":[],"label_agreement":null},{"id":"W2125656363","doi":"10.1109/tpwrs.2008.2004827","title":"Kinetic Energy of Wind-Turbine Generators for System Frequency Support","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":347,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Wind power; Turbine; Kinetic energy; Electric power system; Computer science; Marine engineering; Power (physics); Electrical engineering; Engineering; Environmental science; Simulation; Aerospace engineering; Physics","score_opus":0.01045633144932118,"score_gpt":0.18737189770958157,"score_spread":0.1769155662602604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125656363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036854178,0.0009739529,0.94537616,0.000012910276,0.010094277,0.0008815383,0.00033076917,0.0007287437,0.004747497],"genre_scores_gemma":[0.99835134,0.00001967123,0.00018617691,0.000012361285,0.00013801215,0.0003408569,0.000010548907,0.000133544,0.0008074854],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9977568,0.00007331625,0.0009600474,0.00035070296,0.00039509597,0.00046404894],"domain_scores_gemma":[0.9987495,0.00010133737,0.0001408831,0.0006324595,0.00019129501,0.00018453882],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018280052,0.00039666492,0.000729563,0.0003698915,0.00013710506,0.000024340603,0.00027114074,0.00024995633,0.000034460325],"category_scores_gemma":[0.0000031319619,0.00038349573,0.00031834858,0.0003577839,0.00005136038,0.00014944407,6.878097e-7,0.00016145218,0.000042025575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001343896,0.00038314634,0.00020824128,0.0029838663,0.0016645439,0.00015313186,0.0016714871,0.8557114,0.119135074,0.0051701595,0.012429908,0.0003546349],"study_design_scores_gemma":[0.017870855,0.0045974366,0.00065401127,0.0025806914,0.0011856245,0.0044162166,0.0015741026,0.3220245,0.568392,0.000052165306,0.07095344,0.0056990148],"about_ca_topic_score_codex":0.000302287,"about_ca_topic_score_gemma":0.000023048377,"teacher_disagreement_score":0.9614972,"about_ca_system_score_codex":0.0002448728,"about_ca_system_score_gemma":0.000070300164,"threshold_uncertainty_score":0.9998617},"labels":[],"label_agreement":null},{"id":"W2126382384","doi":"10.1109/tpwrs.2007.907385","title":"Commutation Failure Reduction in HVDC Systems Using Adaptive Fuzzy Logic Controller","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Control theory (sociology); Fuzzy logic; Controller (irrigation); Benchmark (surveying); Fault (geology); Fuzzy control system; Control engineering; Commutation; Operating point; Computer science; Electric power system; Reduction (mathematics); Engineering; Control (management); Power (physics); Mathematics; Electronic engineering; Artificial intelligence; Voltage","score_opus":0.020461976158324468,"score_gpt":0.23799504824087941,"score_spread":0.21753307208255496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126382384","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029200444,0.0020386274,0.9454825,0.00002333366,0.016196514,0.001857744,0.000058602454,0.00068310293,0.0044591217],"genre_scores_gemma":[0.9990188,0.000016031383,0.00024583607,0.000013265706,0.00012072259,0.0002026304,0.0000045446427,0.00012296299,0.00025523212],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967147,0.0002806,0.0012922887,0.00047841584,0.00049176294,0.0007422208],"domain_scores_gemma":[0.998668,0.00019915489,0.00020264112,0.0005352668,0.0002147107,0.00018020958],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012018612,0.0005107124,0.00075353857,0.0008997281,0.00018474246,0.00016086303,0.00027099554,0.00046274465,0.000015062526],"category_scores_gemma":[0.000007588102,0.0005282452,0.00018949751,0.00081438303,0.0000771315,0.00054695393,0.0000010527904,0.0007024827,0.0001288617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012999555,0.000099803925,0.000018417051,0.00012486753,0.0002071356,0.00004276796,0.0012096943,0.9720302,0.024627596,0.0010748955,0.00026930333,0.00016529941],"study_design_scores_gemma":[0.006146574,0.0005891147,0.00014596625,0.0017734249,0.00020394906,0.0010897581,0.013370122,0.9672058,0.004681245,0.00013364709,0.0027865241,0.0018738736],"about_ca_topic_score_codex":0.001396076,"about_ca_topic_score_gemma":0.00032696096,"teacher_disagreement_score":0.96981835,"about_ca_system_score_codex":0.0013376061,"about_ca_system_score_gemma":0.000048153775,"threshold_uncertainty_score":0.99971694},"labels":[],"label_agreement":null},{"id":"W2127189756","doi":"10.1109/tpwrs.2006.873020","title":"Design and Real-Time Implementation of Robust FACTS Controller for Damping Inter-Area Oscillation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Opal-Rt Technologies (Canada)","funders":"Engineering and Physical Sciences Research Council","keywords":"Control theory (sociology); Controller (irrigation); Robust control; Time domain; Electric power system; Oscillation (cell signaling); Power (physics); Set (abstract data type); Control engineering; Robustness (evolution); Engineering; Linear matrix inequality; Coupling (piping); Frequency domain; Computer science; Control system; Control (management); Mathematics","score_opus":0.018740564460622125,"score_gpt":0.2359429201783286,"score_spread":0.21720235571770646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127189756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011643814,0.000045439763,0.98547935,0.00001283894,0.0007154498,0.0012353455,0.00010015592,0.00018401557,0.0005836002],"genre_scores_gemma":[0.9980701,0.000010455422,0.0015665609,0.0000030634194,0.0000050770086,0.0001392791,0.000011541402,0.000029452849,0.00016446642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988986,0.000080573984,0.00052187726,0.00018888406,0.00013541036,0.00017462285],"domain_scores_gemma":[0.9994224,0.00016966932,0.00009371373,0.00015213249,0.00011537389,0.00004672107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032857305,0.00016101688,0.00028449504,0.00015668843,0.00008364804,0.00005127341,0.000051319526,0.00008680343,0.00004544723],"category_scores_gemma":[0.0000020914335,0.00016073187,0.00006705687,0.0001242223,0.000019812429,0.00017773466,4.012222e-7,0.0000479286,0.000004546969],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044223834,0.00002805675,0.000056961093,0.00012532037,0.000057419285,1.7470853e-7,0.00039523645,0.9884399,0.010264367,0.000050847866,0.0003785944,0.00015886789],"study_design_scores_gemma":[0.0018032796,0.0001700181,0.00034976727,0.00009789388,0.000051382674,0.0000067247906,0.0004898284,0.9867574,0.009540357,0.000012458371,0.00046279133,0.00025810415],"about_ca_topic_score_codex":0.00022573902,"about_ca_topic_score_gemma":0.000042462572,"teacher_disagreement_score":0.9864263,"about_ca_system_score_codex":0.00010992466,"about_ca_system_score_gemma":0.000017490293,"threshold_uncertainty_score":0.6554456},"labels":[],"label_agreement":null},{"id":"W2127438382","doi":"10.1109/tpwrs.2009.2030387","title":"Climate Change Impacts on Residential and Commercial Loads in the Western U.S. Grid","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Renewable Energy Laboratory; Department of Atmospheric Sciences, Texas A and M University; Texas A and M University","keywords":"Climate change; Environmental science; Peak load; Air conditioning; Grid; Energy consumption; Meteorology; Engineering; Automotive engineering; Geography; Electrical engineering; Ecology","score_opus":0.01572379752113007,"score_gpt":0.23137001855375303,"score_spread":0.21564622103262296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127438382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72809273,0.0007252577,0.2547769,0.001184392,0.009389386,0.0010825892,0.000092661714,0.00065766834,0.003998426],"genre_scores_gemma":[0.9993915,0.00020004566,0.000008268094,0.00026498953,0.0000631994,0.00003694423,0.0000027176009,0.0000151320555,0.000017215876],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993401,0.000047639955,0.00016694516,0.00011476762,0.00013897117,0.00019153183],"domain_scores_gemma":[0.9997282,0.00002908834,0.000020497437,0.00017735364,0.0000086605,0.00003622466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014092636,0.00012626448,0.00012402798,0.00012876392,0.00009348599,0.00007628371,0.000092613096,0.00008903801,0.000004467182],"category_scores_gemma":[5.075824e-7,0.00010191855,0.000033375934,0.00014890402,0.00001131967,0.00014972666,3.2043283e-7,0.00018904159,0.000006438146],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010828814,0.00014908287,0.00013082844,0.000053851712,0.000024795303,0.00002267915,0.0026163177,0.99118876,0.00017925375,0.0003162178,0.0009040524,0.0043058894],"study_design_scores_gemma":[0.018789943,0.008775924,0.29846412,0.0080993585,0.0006448085,0.0013070378,0.002716484,0.5852327,0.029505476,0.00024378028,0.03895055,0.0072698146],"about_ca_topic_score_codex":0.00008273339,"about_ca_topic_score_gemma":0.0001577861,"teacher_disagreement_score":0.40595606,"about_ca_system_score_codex":0.000034583907,"about_ca_system_score_gemma":0.000003057729,"threshold_uncertainty_score":0.41561177},"labels":[],"label_agreement":null},{"id":"W2127512607","doi":"10.1109/tpwrs.2003.814909","title":"Software implementation of online risk-based security assessment","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":98,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PricewaterhouseCoopers (Canada)","funders":"","keywords":"Computer science; Visualization; Software security assurance; Software; Probabilistic risk assessment; Probabilistic logic; Security management; Network security; Risk management; Risk analysis (engineering); Computer security; Risk assessment; Software engineering; Reliability engineering; Data mining; Information security; Engineering; Security service; Artificial intelligence","score_opus":0.007663946340115724,"score_gpt":0.2540567788291577,"score_spread":0.246392832489042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127512607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08978137,0.00016880063,0.9050523,0.000011357486,0.0031168899,0.00051273184,0.0006332776,0.0002648205,0.00045845966],"genre_scores_gemma":[0.99884236,0.000031142557,0.0009310212,0.000012809331,0.000006111243,0.000095429496,0.00000806329,0.00003338652,0.000039680035],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99852663,0.00017432241,0.0005362858,0.00022064739,0.00028439044,0.0002577175],"domain_scores_gemma":[0.9991596,0.000111762216,0.00011379944,0.0004195527,0.0001070348,0.00008830478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040158504,0.00020071278,0.0003024573,0.00013429516,0.000078608784,0.000022397388,0.000115091636,0.00010531801,0.00011076335],"category_scores_gemma":[0.0000061523365,0.00019740319,0.00014592218,0.0002578327,0.00003084114,0.000112491856,3.0519612e-7,0.0002473204,0.000015889782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051640756,0.0013485728,0.003745807,0.0024447883,0.00066732254,0.000014127182,0.0023206107,0.9798385,0.0031797013,0.0011370501,0.0024858995,0.0027659622],"study_design_scores_gemma":[0.023871096,0.0049132234,0.027012423,0.004002673,0.0014314492,0.00020690566,0.029563924,0.3029847,0.37037584,0.00082808326,0.22793512,0.0068745357],"about_ca_topic_score_codex":0.00026107673,"about_ca_topic_score_gemma":0.00028461104,"teacher_disagreement_score":0.909061,"about_ca_system_score_codex":0.00021504244,"about_ca_system_score_gemma":0.000093466006,"threshold_uncertainty_score":0.80498683},"labels":[],"label_agreement":null},{"id":"W2127558900","doi":"10.1109/tpwrs.2008.919240","title":"Assessment of Two Methods to Select Wide-Area Signals for Power System Damping Control","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":156,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Robustness (evolution); Control theory (sociology); Electric power system; Static VAR compensator; Computer science; Automatic frequency control; Control system; Engineering; Control engineering; Power (physics); Control (management); Physics","score_opus":0.024942403876274194,"score_gpt":0.3082578454902329,"score_spread":0.2833154416139587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127558900","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039608246,0.00015521121,0.98467374,0.000021922879,0.003963256,0.0024610253,0.00028771439,0.00056564604,0.0039106454],"genre_scores_gemma":[0.98702407,0.0000039538245,0.0115684625,0.000041924304,0.000006410415,0.001044372,0.0000031009665,0.000081908904,0.00022577075],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99729806,0.00037710104,0.001058816,0.00042518595,0.00039197644,0.0004488846],"domain_scores_gemma":[0.9979326,0.0007039593,0.00014315169,0.00061450666,0.00036317582,0.00024260029],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012012724,0.00036456977,0.00087222626,0.00035321352,0.00020921884,0.00004861874,0.0002481893,0.00015418616,0.000051976574],"category_scores_gemma":[0.000018789084,0.00035708363,0.0003099702,0.0005093966,0.000034959237,0.00017257869,0.0000011092242,0.00019458677,0.000012648556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003914075,0.00009799967,0.00014698057,0.00040926927,0.00032049284,0.0000032318449,0.00057798944,0.99195296,0.0056926585,0.00020385905,0.00052055134,0.000034845834],"study_design_scores_gemma":[0.0037634608,0.0006365974,0.0006207161,0.0006572338,0.00018626274,0.00013615275,0.0009779902,0.9594088,0.027141562,0.0000036827955,0.0054213116,0.0010462182],"about_ca_topic_score_codex":0.0000469337,"about_ca_topic_score_gemma":0.000010597493,"teacher_disagreement_score":0.9830633,"about_ca_system_score_codex":0.00044569146,"about_ca_system_score_gemma":0.000092209106,"threshold_uncertainty_score":0.9998881},"labels":[],"label_agreement":null},{"id":"W2127664368","doi":"10.1109/tpwrs.2007.894867","title":"Pricing Energy and Reserves Using Stochastic Optimization in an Alternative Electricity Market","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":141,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Independent Electricity System Operator","keywords":"Activity-based costing; Electricity market; Electric power system; Linear programming; Energy market; Stochastic programming; Electricity; Electricity pricing; Computer science; Profit (economics); Mathematical optimization; Contingency; Operations research; Economics; Microeconomics; Engineering; Electrical engineering; Mathematics; Power (physics)","score_opus":0.01221753262752926,"score_gpt":0.2313100404976195,"score_spread":0.21909250787009024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127664368","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049918678,0.00026009415,0.94712603,0.000002210777,0.0013341543,0.0003029871,0.000006374788,0.0002251052,0.00082438346],"genre_scores_gemma":[0.99840236,0.00004890281,0.0013545903,0.000006236826,0.000022972317,0.000025575935,0.0000025678453,0.00006570751,0.00007106809],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983566,0.00013820193,0.00050991506,0.0003133303,0.00027386926,0.00040807543],"domain_scores_gemma":[0.99924153,0.00023993095,0.00008490375,0.00023927193,0.00007248505,0.00012188248],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005902925,0.0002420926,0.00027407246,0.0007894248,0.00010697041,0.00009134356,0.00012069546,0.0001569807,0.000012824249],"category_scores_gemma":[0.000012328085,0.00026922204,0.000034397475,0.00087809004,0.000019778226,0.00050376717,8.8252403e-7,0.00019099526,8.0776204e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044896336,0.000049534785,0.000028855944,0.00003598782,0.00003330043,0.0000085826705,0.00048091693,0.997996,0.0009906325,0.00003659185,0.000009395267,0.00028535852],"study_design_scores_gemma":[0.000408412,0.000117236705,0.000057671154,0.0001355967,0.000017696631,0.0000464064,0.00015599429,0.99606204,0.0027172957,0.0000036053177,0.000017821589,0.0002602185],"about_ca_topic_score_codex":0.00044939778,"about_ca_topic_score_gemma":0.00027539447,"teacher_disagreement_score":0.9484837,"about_ca_system_score_codex":0.00046578402,"about_ca_system_score_gemma":0.00002549136,"threshold_uncertainty_score":0.999976},"labels":[],"label_agreement":null},{"id":"W2127925682","doi":"10.1109/tpwrs.2006.879246","title":"Grey Predictor for Wind Energy Conversion Systems Output Power Prediction","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Grey System Theory Applications","field":"Decision Sciences","cited_by":179,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wind power; Wind speed; Electric power system; Electricity generation; Electricity; Wind power forecasting; Power (physics); Computer science; Meteorology; Engineering; Econometrics; Control theory (sociology); Mathematics; Artificial intelligence; Electrical engineering; Geography","score_opus":0.033744587415876826,"score_gpt":0.27763037153716363,"score_spread":0.2438857841212868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127925682","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022884166,0.000319136,0.95024234,0.00017975611,0.015640996,0.002184142,0.0019439588,0.00046297474,0.006142531],"genre_scores_gemma":[0.9648551,0.000003929413,0.000059499194,0.000053745236,0.00017487112,0.00084848155,0.000033278564,0.0000856844,0.033885434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9933436,0.00065417367,0.0020021861,0.0012880606,0.0020544864,0.000657508],"domain_scores_gemma":[0.99442905,0.0015769331,0.0007484801,0.0017700818,0.001170603,0.0003048311],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0027199704,0.00050815276,0.00077456905,0.00090576743,0.000805955,0.00072058156,0.0009799248,0.00046420543,0.00016772305],"category_scores_gemma":[0.00006967683,0.00042901112,0.00048272818,0.0010792963,0.00017363013,0.0007304663,0.0000051886736,0.00024404343,0.00076859846],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016416603,0.002982567,0.0023744036,0.0003967224,0.00089015125,0.00003453953,0.002424735,0.5093976,0.011490522,0.08700502,0.3804817,0.0008803856],"study_design_scores_gemma":[0.004444161,0.0013769679,0.0017375788,0.0004710971,0.000278458,0.00031755512,0.0049420893,0.08740446,0.0047317515,0.0023482312,0.8905386,0.0014091022],"about_ca_topic_score_codex":0.0007487503,"about_ca_topic_score_gemma":0.000053218628,"teacher_disagreement_score":0.95018286,"about_ca_system_score_codex":0.00037897058,"about_ca_system_score_gemma":0.00015626957,"threshold_uncertainty_score":0.9998162},"labels":[],"label_agreement":null},{"id":"W2129651074","doi":"10.1109/tpwrs.2008.920078","title":"Effects of Load Forecast Uncertainty on Bulk Electric System Reliability Evaluation","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":126,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Range (aeronautics); Electric power system; Load factor; Transmission system; Load management; Computer science; Transmission (telecommunications); Engineering; Power (physics); Electrical engineering; Structural engineering","score_opus":0.009881543955925448,"score_gpt":0.2064224155983556,"score_spread":0.19654087164243017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129651074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4241839,0.00086107274,0.5558213,0.000018069248,0.009159358,0.0028603568,0.000059359845,0.0007674194,0.006269161],"genre_scores_gemma":[0.9990591,0.000051229155,0.000025057494,0.000009593162,0.00002633844,0.00054875296,0.0000020149823,0.000054893382,0.00022305135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969399,0.0003225461,0.00079892605,0.00047236422,0.001003136,0.00046313455],"domain_scores_gemma":[0.9980306,0.00044204498,0.00014283082,0.0007895876,0.0004441059,0.00015080787],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010732249,0.0003741522,0.00062328647,0.00024301343,0.00017478805,0.00002014586,0.0002500856,0.00026110074,0.000013582084],"category_scores_gemma":[0.000050639337,0.0003397831,0.00026957633,0.00061318313,0.000068075846,0.00015855551,9.871318e-7,0.0003688067,0.00013508312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017341542,0.0003212093,0.000014083457,0.0026871325,0.0001575748,0.000016199823,0.0010005216,0.98581105,0.008196126,0.00016816074,0.0009911458,0.00046339803],"study_design_scores_gemma":[0.0040952307,0.0018410847,0.00074315164,0.0032424547,0.0003369884,0.0002981539,0.00044850662,0.8075151,0.17499927,0.000027102109,0.0051624607,0.0012904789],"about_ca_topic_score_codex":0.0003077795,"about_ca_topic_score_gemma":0.00002102344,"teacher_disagreement_score":0.5748752,"about_ca_system_score_codex":0.0019698604,"about_ca_system_score_gemma":0.00018817533,"threshold_uncertainty_score":0.9999054},"labels":[],"label_agreement":null},{"id":"W2129747445","doi":"10.1109/tpwrs.2005.846197","title":"IEEE PSS2B Versus PSS4B: The Limits of Performance of Modern Power System Stabilizers","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":212,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"Polytechnique Montréal","keywords":"Electric power system; Governor; Computer science; Low-frequency oscillation; Emphasis (telecommunications); Power (physics); Point (geometry); Engineering; Control theory (sociology); Control engineering; Reliability engineering; Electrical engineering; Control (management)","score_opus":0.01865629815236078,"score_gpt":0.22454931779537873,"score_spread":0.20589301964301795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129747445","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22523879,0.0006237374,0.75402683,0.00003214446,0.0076046023,0.00086138875,0.00017336523,0.00040513623,0.011033991],"genre_scores_gemma":[0.999457,0.000038419697,0.000111104295,0.0000056441695,0.000011598032,0.000091501686,0.0000013552661,0.00006063692,0.00022275292],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99768543,0.00014832645,0.0009755486,0.00029244256,0.00054404436,0.00035423075],"domain_scores_gemma":[0.998368,0.00020378245,0.00017773852,0.0009127985,0.00021867716,0.00011897458],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004911895,0.00031947333,0.0005400252,0.00018918699,0.00012428462,0.000032248325,0.00037756335,0.00018704218,0.00006599358],"category_scores_gemma":[0.0000051198986,0.0002565344,0.000235365,0.00041789835,0.00010947805,0.00026875117,0.0000012091856,0.00027082133,0.000052179574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021554487,0.00011418534,0.00003056483,0.0005703913,0.00018463096,5.426432e-7,0.0020645198,0.99427944,0.0019844058,0.00013691127,0.00015228296,0.00026659403],"study_design_scores_gemma":[0.0023819425,0.0005614971,0.00013584757,0.0005604209,0.0001328058,0.000031538,0.0024913638,0.9442055,0.043658786,6.126333e-7,0.005230119,0.000609533],"about_ca_topic_score_codex":0.00002288944,"about_ca_topic_score_gemma":0.00003805908,"teacher_disagreement_score":0.7742182,"about_ca_system_score_codex":0.00029641183,"about_ca_system_score_gemma":0.000059934486,"threshold_uncertainty_score":0.9999887},"labels":[],"label_agreement":null},{"id":"W2129885099","doi":"10.1109/59.871737","title":"Robust design and coordination of multiple damping controllers using nonlinear constrained optimization","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":117,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Energie NB Power (Canada); Hydro-Québec","funders":"","keywords":"Control theory (sociology); Robustness (evolution); Transfer function; Electric power system; Cascade; Modal; Nonlinear system; Multivariable calculus; Minification; Robust control; Sensitivity (control systems); Engineering; Stability (learning theory); Control engineering; Mathematical optimization; Computer science; Control system; Power (physics); Mathematics; Control (management); Electronic engineering","score_opus":0.024825294504567656,"score_gpt":0.21247580918978645,"score_spread":0.1876505146852188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129885099","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008793083,0.00011596184,0.9885974,0.0000110671135,0.00073119113,0.00074911985,0.00006340736,0.00021234149,0.00072640995],"genre_scores_gemma":[0.98190343,0.000028346425,0.017873075,0.000006820464,0.0000042590777,0.000028413007,0.000004890279,0.000034392557,0.00011636523],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875695,0.00014517833,0.0005192579,0.00021238305,0.00018007233,0.00018613524],"domain_scores_gemma":[0.9993638,0.00016075785,0.00007030899,0.00020639303,0.00011136661,0.00008739984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032356294,0.00019101823,0.00033284968,0.0001690136,0.000119123804,0.00005231297,0.00006925036,0.00013095829,0.0001705017],"category_scores_gemma":[0.000007631756,0.00020135961,0.000065206594,0.00025742236,0.00006436773,0.00022494832,3.3276754e-7,0.0001095811,0.00000436902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006315388,0.0000461026,0.000012310408,0.000075062126,0.00006382351,8.350317e-7,0.00031788548,0.99834126,0.00089021644,0.000005103737,0.000016461958,0.00016779662],"study_design_scores_gemma":[0.0012298153,0.00006174375,0.00000574807,0.00010480817,0.000031495845,0.000017666513,0.00021728773,0.99701244,0.0010154586,3.8313377e-7,0.0001248128,0.00017833432],"about_ca_topic_score_codex":0.000042635493,"about_ca_topic_score_gemma":0.000004761507,"teacher_disagreement_score":0.9731104,"about_ca_system_score_codex":0.00009898492,"about_ca_system_score_gemma":0.000031398547,"threshold_uncertainty_score":0.8211206},"labels":[],"label_agreement":null},{"id":"W2129942545","doi":"10.1109/tpwrs.2004.836165","title":"Transient Analysis of Systems With Multiple Nonlinear Elements Using TLM","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Nonlinear system; Transient (computer programming); Convergence (economics); Transmission line; Transient analysis; Newton's method; Electric power system; Computer science; Electric power transmission; Transmission system; Control theory (sociology); Transient response; Algorithm; Transmission (telecommunications); Mathematical optimization; Mathematics; Power (physics); Engineering; Physics; Telecommunications; Electrical engineering","score_opus":0.011385499007791913,"score_gpt":0.2241406930762068,"score_spread":0.21275519406841487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129942545","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18381134,0.00018206963,0.8130151,0.000003899068,0.0012435393,0.00066693086,0.00016459759,0.00020728877,0.00070526014],"genre_scores_gemma":[0.9994317,0.000008728247,0.0003035912,0.0000051777934,0.000017740125,0.00006426076,0.000010571352,0.00005974048,0.00009848253],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99794054,0.0000689424,0.00085412106,0.000288818,0.00052320614,0.00032436877],"domain_scores_gemma":[0.999038,0.000056529283,0.00014602591,0.00047086793,0.00014623297,0.00014233882],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021371584,0.00029601014,0.0006930787,0.00066338497,0.00010034494,0.000083221006,0.00014781671,0.00012988214,0.000027093412],"category_scores_gemma":[0.0000012029385,0.00025866108,0.0002609107,0.0011074482,0.00003139801,0.0001959095,3.5514742e-7,0.00015428795,0.000020485368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052029838,0.00011840548,0.00014329045,0.00012415796,0.0020609484,0.0000058268606,0.00048503492,0.99220353,0.004749073,0.000016611357,0.000004144282,0.000036934685],"study_design_scores_gemma":[0.0019370932,0.00013165803,0.00018682225,0.00023353095,0.0007828368,0.000013683113,0.0005867763,0.9940818,0.0012693722,2.1602031e-7,0.00048499706,0.0002911986],"about_ca_topic_score_codex":0.0011036175,"about_ca_topic_score_gemma":0.00019133152,"teacher_disagreement_score":0.81562036,"about_ca_system_score_codex":0.0002484074,"about_ca_system_score_gemma":0.000042091342,"threshold_uncertainty_score":0.9999866},"labels":[],"label_agreement":null},{"id":"W2130126778","doi":"10.1109/tpwrs.2003.821443","title":"Unit Commitment With Dual Variable Constraints","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Unit (ring theory); Electricity market; Dual (grammatical number); Electricity; Margin (machine learning); Variable (mathematics); Economic dispatch; Economics; Computer science; Microeconomics; Production (economics); Operations research; Unit price; Marginal cost; Mathematical optimization; Electric power system; Power (physics); Engineering; Mathematics","score_opus":0.008631209271090732,"score_gpt":0.1925792035961298,"score_spread":0.18394799432503905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130126778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027652567,0.000097546465,0.97654814,0.000025157458,0.0022725312,0.0006169356,0.000053570406,0.00069982634,0.016921042],"genre_scores_gemma":[0.99797785,0.000012877645,0.0012374591,0.000025095023,0.000013220715,0.00014504026,0.000005706194,0.00006974074,0.0005130059],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986927,0.00004715128,0.00034408248,0.00023310643,0.00032097747,0.00036200977],"domain_scores_gemma":[0.9993066,0.00004607509,0.000048118764,0.00038035025,0.000083492174,0.00013531501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015666649,0.0002629996,0.00027115998,0.00020806864,0.00013197471,0.00008461668,0.00011927779,0.00013238406,0.00009747426],"category_scores_gemma":[0.0000010957733,0.00024296583,0.0000457448,0.0005359191,0.000052167456,0.00018511643,3.7731232e-7,0.00025342623,0.00017651291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016168935,0.00009461866,0.0000071073473,0.00006171263,0.00018185722,0.000021127638,0.0002915565,0.9975094,0.0005261594,0.0010481906,0.00018231194,0.000059781876],"study_design_scores_gemma":[0.06103109,0.01233844,0.0005237339,0.011391694,0.002223661,0.01298124,0.009607745,0.52465,0.23260711,0.0004588314,0.11747803,0.0147084715],"about_ca_topic_score_codex":0.00007656414,"about_ca_topic_score_gemma":0.000017428196,"teacher_disagreement_score":0.9952126,"about_ca_system_score_codex":0.00032098588,"about_ca_system_score_gemma":0.00008831661,"threshold_uncertainty_score":0.9907859},"labels":[],"label_agreement":null},{"id":"W2130400949","doi":"10.1109/tpwrs.2006.873010","title":"Evenly Distributed Pareto Points in Multi-Objective Optimal Power Flow","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Power flow; Pareto principle; Mathematical optimization; Intersection (aeronautics); Multi-objective optimization; Electric power system; Pareto analysis; Pareto optimal; Flow (mathematics); Power (physics); Computer science; Mathematics; Engineering; Geometry; Physics","score_opus":0.008737540782902741,"score_gpt":0.21539524839401294,"score_spread":0.20665770761111021,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130400949","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09164758,0.00018798566,0.90055054,0.000035146833,0.0035196848,0.0006703603,0.0018664425,0.0006418972,0.000880349],"genre_scores_gemma":[0.99869365,0.000006519236,0.00066160434,0.000010603255,0.000019215333,0.0001937196,0.00012007933,0.000089283894,0.00020534577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99770373,0.000104693005,0.0006785028,0.000471463,0.0003782387,0.0006633903],"domain_scores_gemma":[0.99913484,0.0000773647,0.00006422087,0.00046351066,0.000119540775,0.00014053962],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024205941,0.0004494209,0.000449149,0.0003073396,0.00011641755,0.00010763362,0.00022286213,0.00030302082,0.00010407925],"category_scores_gemma":[0.000006399718,0.00049342704,0.0001952899,0.00066695095,0.000056408368,0.00037915303,0.0000017329048,0.00053413876,0.00039690526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006987498,0.00037774155,0.0001307067,0.000042918626,0.000080342244,0.000049929575,0.00025089283,0.9953261,0.0016231652,0.00003922082,0.0019621078,0.000046998663],"study_design_scores_gemma":[0.0052792653,0.0005037779,0.013145347,0.0005541439,0.00010863003,0.00015171716,0.001206843,0.9479532,0.020035096,0.000019096731,0.008957199,0.0020856909],"about_ca_topic_score_codex":0.000309285,"about_ca_topic_score_gemma":0.00028106893,"teacher_disagreement_score":0.907046,"about_ca_system_score_codex":0.00083048176,"about_ca_system_score_gemma":0.000041419768,"threshold_uncertainty_score":0.99975175},"labels":[],"label_agreement":null},{"id":"W2131151364","doi":"10.1109/tpwrs.2002.807050","title":"Effect of detailed power system models in traditional and voltage-stability-constrained optimal power-flow problems","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Calgary","funders":"","keywords":"Control theory (sociology); AC power; Electric power system; Generator (circuit theory); Power flow; Voltage; Voltage optimisation; Stability (learning theory); Mathematical optimization; Power-flow study; Static VAR compensator; Volt-ampere reactive; Power (physics); Computer science; Engineering; Mathematics; Electrical engineering","score_opus":0.01274772558943609,"score_gpt":0.19612567967069353,"score_spread":0.18337795408125743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131151364","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14046642,0.0003387337,0.84576035,0.0000056439385,0.0020305172,0.0015993394,0.00032403556,0.0003525417,0.009122413],"genre_scores_gemma":[0.9992075,0.000008724152,0.00030675696,0.0000035662783,0.000002663203,0.00034175062,0.000006592542,0.00007051329,0.00005193164],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967588,0.0005692999,0.0011534705,0.000550678,0.00047857215,0.0004891327],"domain_scores_gemma":[0.9985374,0.00041729378,0.00012389034,0.0005616443,0.0001235299,0.00023621994],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015282339,0.00049718143,0.00089391856,0.00039713783,0.00011090006,0.000077171324,0.00017631894,0.00031287762,0.00016394242],"category_scores_gemma":[0.000019035182,0.00047221975,0.00022448205,0.0005144829,0.00014229811,0.00041429405,0.0000010102104,0.00039736193,0.00001469645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000992287,0.00021829904,0.00017172415,0.0013547407,0.00014183657,0.000010513411,0.0015438006,0.9930961,0.0020544378,0.0012584603,0.000024301682,0.000026516696],"study_design_scores_gemma":[0.004288029,0.0012459176,0.0001229343,0.000874264,0.00009292607,0.0002393762,0.001602442,0.97765297,0.012708688,0.000018898289,0.0002235873,0.0009299789],"about_ca_topic_score_codex":0.00002164998,"about_ca_topic_score_gemma":0.000023232664,"teacher_disagreement_score":0.8587411,"about_ca_system_score_codex":0.00035603496,"about_ca_system_score_gemma":0.00007479018,"threshold_uncertainty_score":0.99977297},"labels":[],"label_agreement":null},{"id":"W2131439847","doi":"10.1109/tpwrs.2009.2016458","title":"Reliability Evaluation for Distribution System With Renewable Distributed Generation During Islanded Mode of Operation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":190,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Wind power; Renewable energy; Electric power system; Distributed generation; Electricity; Electricity generation; Computer science; Electricity market; Limiting; Engineering; Power (physics); Risk analysis (engineering); Electrical engineering; Business","score_opus":0.010906976360255583,"score_gpt":0.2260919295911663,"score_spread":0.21518495323091072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131439847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13900867,0.00006861747,0.85655975,0.000026855712,0.0013057078,0.0017643294,0.00082263653,0.00028645297,0.00015697256],"genre_scores_gemma":[0.99899596,0.0000081925455,0.00014801625,0.0000028027941,0.000031341235,0.00047031083,0.00026151884,0.000023767678,0.000058118872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981408,0.00012456374,0.0006525804,0.00035210937,0.00044944484,0.00028046282],"domain_scores_gemma":[0.99877095,0.000044416593,0.00012353076,0.0004998375,0.0004840312,0.000077248944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063494727,0.00024228226,0.00037443687,0.000081941755,0.00019568647,0.000065971915,0.00012094777,0.00017081524,0.0000044991248],"category_scores_gemma":[0.000013867018,0.00021208153,0.000108821565,0.00025063378,0.000026396625,0.00034816956,4.1713508e-7,0.000115633746,0.000004117071],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014536649,0.000085825624,0.0000040558193,0.00039817614,0.00004176793,4.1090547e-7,0.00017949574,0.96582,0.03285803,0.00014091707,0.0002601032,0.00006586363],"study_design_scores_gemma":[0.0013473055,0.00033608993,0.00018404462,0.00033788657,0.00008668251,0.00001988914,0.00020595393,0.9002035,0.09680916,0.00000899438,0.00021106387,0.00024940845],"about_ca_topic_score_codex":0.00014860506,"about_ca_topic_score_gemma":0.000106315645,"teacher_disagreement_score":0.85998726,"about_ca_system_score_codex":0.00081893767,"about_ca_system_score_gemma":0.00006447845,"threshold_uncertainty_score":0.86484337},"labels":[],"label_agreement":null},{"id":"W2132745496","doi":"10.1109/tpwrs.2009.2016485","title":"Unit Commitment Risk Analysis of Wind Integrated Power Systems","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Power system simulation; Electric power system; Reliability engineering; Power (physics); Wind speed; Engineering; Automotive engineering; Nameplate capacity; Base load power plant; Electricity generation; Computer science; Operations research; Control theory (sociology); Electrical engineering; Meteorology; Control (management)","score_opus":0.009659329868559023,"score_gpt":0.2152592002114046,"score_spread":0.20559987034284558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132745496","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09292133,0.0011017661,0.89226705,0.000025974565,0.005393737,0.00088110956,0.0007316615,0.0005271898,0.006150168],"genre_scores_gemma":[0.99891204,0.00009211993,0.000033665612,0.000018560706,0.000006100199,0.000046261703,0.00001239094,0.00003949388,0.000839354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99733543,0.00026799258,0.0010485749,0.000401774,0.0004782743,0.00046795755],"domain_scores_gemma":[0.9981699,0.00015907547,0.00020804771,0.0010230393,0.00023960327,0.00020033163],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00063801446,0.00042012794,0.0010014769,0.0007955057,0.00012797801,0.00008628359,0.00035604314,0.00026757576,0.000082172686],"category_scores_gemma":[0.000009057156,0.00037155274,0.00045039112,0.001799742,0.000065552435,0.00018754661,9.548969e-7,0.00046194787,0.00008362737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053219832,0.0002878269,0.00015521537,0.0001224427,0.0023315568,0.000010193755,0.0010375041,0.9936765,0.0009467532,0.00033021483,0.00092804275,0.00012054473],"study_design_scores_gemma":[0.0038029228,0.002603285,0.0095480485,0.002510338,0.0062816176,0.00010823477,0.009653671,0.83462757,0.009446509,0.000035420835,0.11829465,0.0030877423],"about_ca_topic_score_codex":0.0007158093,"about_ca_topic_score_gemma":0.000093385526,"teacher_disagreement_score":0.9059907,"about_ca_system_score_codex":0.00028625963,"about_ca_system_score_gemma":0.000039685747,"threshold_uncertainty_score":0.99987364},"labels":[],"label_agreement":null},{"id":"W2133863979","doi":"10.1109/tpwrs.2002.800916","title":"Convertible static compensator performance studies on the NY state transmission system","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"","keywords":"Transformer; Converters; Engineering; Electric power transmission; Installation; Electric power system; Capacitor; Transmission system; Transmission line; Transient (computer programming); Electrical engineering; Voltage; Maximum power transfer theorem; Electronic engineering; Control theory (sociology); Power (physics); Computer science; Transmission (telecommunications); Physics; Control (management)","score_opus":0.03087802149245259,"score_gpt":0.21545313018719736,"score_spread":0.18457510869474478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133863979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07009274,0.0012348493,0.9112825,0.00020984432,0.007916203,0.0015150694,0.000119487246,0.0012545633,0.0063747554],"genre_scores_gemma":[0.9980533,0.00022557264,0.00003414231,0.00006687737,0.0000056094104,0.00019471228,0.0000010068097,0.000056868626,0.0013619069],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979714,0.0002291973,0.00068840623,0.00030218964,0.00044710247,0.0003616781],"domain_scores_gemma":[0.99882406,0.0002678858,0.000081345795,0.00056614785,0.000117469455,0.00014309357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039096014,0.00033930858,0.00044313536,0.00014844647,0.0003616044,0.00009041598,0.00022405158,0.000085016356,0.00017662374],"category_scores_gemma":[0.0000036708034,0.00023611827,0.00012624849,0.0003453897,0.000071775634,0.00017651066,7.508918e-7,0.00030419667,0.00056558306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003815631,0.000113227325,0.000010613705,0.0011169544,0.00027144307,0.0000069563507,0.005593516,0.98877114,0.00022164552,0.00015762581,0.0034126313,0.00028611868],"study_design_scores_gemma":[0.00055281987,0.00021163907,0.000018172872,0.000811308,0.000036575013,0.000025108106,0.002843136,0.981525,0.004993493,9.159087e-7,0.008627969,0.00035388593],"about_ca_topic_score_codex":0.000008994871,"about_ca_topic_score_gemma":0.0000041519124,"teacher_disagreement_score":0.9279606,"about_ca_system_score_codex":0.0003319991,"about_ca_system_score_gemma":0.000013253895,"threshold_uncertainty_score":0.9628624},"labels":[],"label_agreement":null},{"id":"W2133886886","doi":"10.1109/tpwrs.2002.800909","title":"Network-constrained multiperiod auction for a pool-based electricity market","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":156,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electricity market; Computer science; Electricity; Scheduling (production processes); Power system simulation; Operations research; Flexibility (engineering); Industrial organization; Operator (biology); Microeconomics; Transparency (behavior); Mathematical optimization; Economics; Electric power system; Operations management; Engineering; Power (physics); Computer security","score_opus":0.011132055854155129,"score_gpt":0.19126979284515416,"score_spread":0.18013773699099903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133886886","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006385705,0.00043646825,0.9882247,0.000057796788,0.004841697,0.0015151426,0.000076409655,0.0011536449,0.003055571],"genre_scores_gemma":[0.9963565,0.00002275199,0.0010975773,0.000057020305,0.00007531401,0.0006883887,0.0000073519936,0.00011070487,0.0015843933],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99797976,0.000114953196,0.0005924085,0.00038160745,0.00029297295,0.0006383269],"domain_scores_gemma":[0.9989887,0.00021970704,0.00009890691,0.00041363086,0.00013414353,0.00014489962],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032920451,0.00036497714,0.00040282094,0.0003250902,0.00025486122,0.00011538067,0.00017411071,0.00027216415,0.00022702715],"category_scores_gemma":[0.000010289123,0.0003976603,0.00020263648,0.00078208797,0.000027711676,0.00021316877,3.0641885e-7,0.0002733722,0.0000668465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054443404,0.0001036752,0.0000052713704,0.0001273603,0.00011656562,0.0000028260952,0.00010831576,0.98271567,0.0005997551,0.000017710288,0.015319021,0.00082939496],"study_design_scores_gemma":[0.0012554183,0.00025341343,0.000011346637,0.000101133184,0.00006247336,0.000040630825,0.000023817129,0.98955053,0.0021793486,0.0000030703932,0.0061091846,0.00040966104],"about_ca_topic_score_codex":0.000028282817,"about_ca_topic_score_gemma":0.0000140319735,"teacher_disagreement_score":0.99571794,"about_ca_system_score_codex":0.00037857902,"about_ca_system_score_gemma":0.000027306962,"threshold_uncertainty_score":0.99984753},"labels":[],"label_agreement":null},{"id":"W2134250703","doi":"10.1109/tpwrs.2002.804917","title":"Real time network simulation with PC-cluster","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Pentium; Workstation; Emtp; Transient (computer programming); Real-time simulation; Computer science; Electric power system; IBM; IBM PC compatible; Simulation; Computer architecture simulator; Cluster (spacecraft); Embedded system; Power system simulation; Operating system; Real-time computing; Power (physics); Software","score_opus":0.006082777739362096,"score_gpt":0.1994413074394156,"score_spread":0.19335852970005352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134250703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00953406,0.000068609304,0.9270877,0.0000096505,0.002022106,0.0006956754,0.000013087402,0.0006894761,0.05987964],"genre_scores_gemma":[0.99530107,0.000006346462,0.00009597586,0.00001982991,0.000048992457,0.00008071448,0.0000036330462,0.00007925568,0.0043641715],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985392,0.00014907995,0.00040798594,0.0002446461,0.00030846157,0.00035064263],"domain_scores_gemma":[0.99916947,0.00015745773,0.000060031678,0.00040521479,0.00007636152,0.00013147599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024322039,0.0002624922,0.00032056004,0.00011586912,0.00014289298,0.0001249345,0.00008696217,0.00015445123,0.00023870434],"category_scores_gemma":[0.00000166046,0.00022798356,0.00009648264,0.00030374742,0.000019380343,0.00023908172,2.0271479e-7,0.00016970758,0.0006873702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041114497,0.000024724808,0.000011640524,0.0000265415,0.000110268,0.000003209606,0.0001253663,0.99856734,0.0003264222,0.00009548169,0.00057142857,0.00009645343],"study_design_scores_gemma":[0.0011856791,0.00012385065,0.000050366212,0.000113232025,0.000045126802,0.000024611443,0.00006643573,0.9804713,0.00019583882,0.0000062927174,0.017361995,0.00035523484],"about_ca_topic_score_codex":0.000040565574,"about_ca_topic_score_gemma":0.00001029442,"teacher_disagreement_score":0.985767,"about_ca_system_score_codex":0.00012393223,"about_ca_system_score_gemma":0.000023246253,"threshold_uncertainty_score":0.92969},"labels":[],"label_agreement":null},{"id":"W2134704122","doi":"10.1109/tpwrs.2006.888956","title":"A Model for Efficient Consumer Pricing Schemes in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity; Complementarity (molecular biology); Electricity market; Marginal cost; Economics; Microeconomics; Electricity pricing; Electricity retailing; Variable pricing; Ex-ante; Industrial organization; Welfare; Business; Market economy","score_opus":0.011983649339828605,"score_gpt":0.22736286847161183,"score_spread":0.21537921913178323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134704122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0349801,0.00046210433,0.9601823,0.000006808915,0.0014978915,0.0011952863,0.000019783323,0.00039987374,0.0012558295],"genre_scores_gemma":[0.9977752,0.00002037313,0.0015309929,0.00001542974,0.000009385799,0.00018998343,0.0000021034778,0.00007302385,0.00038352242],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99818534,0.000038330185,0.00061448826,0.000303086,0.00027329492,0.00058548147],"domain_scores_gemma":[0.99920714,0.00023658464,0.0000662077,0.0002901582,0.000096537224,0.00010336573],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008320367,0.00025650323,0.00032241718,0.00063886424,0.000094214076,0.00004622357,0.00014221024,0.00019051327,0.0000060124557],"category_scores_gemma":[0.000011405166,0.00027452357,0.000103260274,0.00077120226,0.000014883306,0.00010106085,4.8422794e-7,0.0002559373,0.000017044056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006656664,0.00009302324,0.000019424948,0.00013119327,0.00005100191,0.000003246247,0.000368181,0.99605626,0.002568085,0.000077858036,0.0001795197,0.00038566164],"study_design_scores_gemma":[0.00073829136,0.00004251046,0.000028426204,0.00012295766,0.000020760095,0.000017789253,0.000047063146,0.9875706,0.010740779,0.0000025755455,0.00039031866,0.00027793212],"about_ca_topic_score_codex":0.000024281735,"about_ca_topic_score_gemma":0.000033164157,"teacher_disagreement_score":0.9627951,"about_ca_system_score_codex":0.00052772876,"about_ca_system_score_gemma":0.0000479835,"threshold_uncertainty_score":0.9999707},"labels":[],"label_agreement":null},{"id":"W2134973660","doi":"10.1109/tpwrs.2005.857836","title":"Electrothermal Coordination Part II: Case Studies","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Thermal Analysis in Power Transmission","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Software deployment; Exploit; Electric power system; Maximum power transfer theorem; Control engineering; Computer science; Power (physics); System dynamics; Engineering; Reliability engineering; Operations research; Computer security","score_opus":0.013817614097675752,"score_gpt":0.24517274900802657,"score_spread":0.2313551349103508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134973660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28734156,0.003065403,0.7012393,0.0002438531,0.0036500017,0.0005045422,0.000047604583,0.0011352364,0.0027725098],"genre_scores_gemma":[0.9967003,0.000096404976,0.00009388787,0.00003938085,0.00006125365,0.00011876796,0.0000014771955,0.00006129255,0.00282727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868774,0.000068073154,0.00041969513,0.00024647012,0.00024872227,0.0003292951],"domain_scores_gemma":[0.9993975,0.00005881167,0.000040112758,0.00031918593,0.00008003898,0.00010436301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020040252,0.00026507804,0.00030433648,0.00021331046,0.00030024652,0.000038176768,0.000120905774,0.00011905145,0.00023871922],"category_scores_gemma":[0.0000016837421,0.00024232747,0.00015517598,0.00029548316,0.000037492904,0.00025893908,6.107106e-7,0.00027252836,0.00018418804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047360518,0.00027827782,0.0000035384294,0.00011789519,0.0010322789,0.00022639794,0.0036933972,0.96414834,0.012269848,0.00014646647,0.005357621,0.0126785645],"study_design_scores_gemma":[0.0032872143,0.0008277383,0.000017336111,0.0008151658,0.00082538876,0.0053263544,0.003504008,0.3956868,0.2586105,0.000022077118,0.32861623,0.002461231],"about_ca_topic_score_codex":0.000015592243,"about_ca_topic_score_gemma":0.000043879812,"teacher_disagreement_score":0.7093587,"about_ca_system_score_codex":0.00023427817,"about_ca_system_score_gemma":0.000011003524,"threshold_uncertainty_score":0.9881828},"labels":[],"label_agreement":null},{"id":"W2135379734","doi":"10.1109/tpwrs.2008.922232","title":"Control and Power Management of Converter Fed Microgrids","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":485,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Microgrid; Voltage droop; Control theory (sociology); AC power; Converters; Voltage source; Automatic frequency control; Voltage regulation; Controller (irrigation); Voltage; Power control; Engineering; Voltage optimisation; Computer science; Power (physics); Control (management); Electrical engineering; Physics","score_opus":0.005001799427319558,"score_gpt":0.1710873726584513,"score_spread":0.16608557323113174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135379734","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03253212,0.0016067877,0.96217555,0.000023502864,0.0016023141,0.00045483268,0.00005583489,0.00017769136,0.0013713468],"genre_scores_gemma":[0.998976,0.00044023318,0.00015366382,0.000029909046,0.0000055954047,0.0000485232,0.000001337085,0.000028089666,0.00031664487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992374,0.000023809662,0.00028564426,0.00015146844,0.00012762556,0.00017401035],"domain_scores_gemma":[0.9996471,0.000020788844,0.0000336565,0.00019354551,0.000042840227,0.00006209776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006260522,0.00015655032,0.00024147322,0.00010589869,0.00006804775,0.000018209155,0.000069601556,0.00007768502,0.00005431469],"category_scores_gemma":[1.67871e-7,0.00014966688,0.00007247401,0.00010540961,0.000043422886,0.0000872884,4.092918e-7,0.00009298933,0.000029752242],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011697931,0.0012113352,0.00053063524,0.0021778184,0.0064824307,0.00031760076,0.006241794,0.89362794,0.061719388,0.00064051815,0.0119332,0.013947554],"study_design_scores_gemma":[0.025397815,0.001472545,0.0045055775,0.0010810619,0.0008835715,0.0008894395,0.0016856452,0.87684137,0.026243512,0.000013791418,0.058389474,0.0025962275],"about_ca_topic_score_codex":0.000019664434,"about_ca_topic_score_gemma":0.0000016946924,"teacher_disagreement_score":0.9664439,"about_ca_system_score_codex":0.000030449908,"about_ca_system_score_gemma":0.0000053621616,"threshold_uncertainty_score":0.61032385},"labels":[],"label_agreement":null},{"id":"W2135395455","doi":"10.1109/tpwrs.2002.800947","title":"Equilibrium of auction markets with unit commitment: the need for augmented pricing","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Profit (economics); Microeconomics; Computer science; Scope (computer science); Unit (ring theory); Competition (biology); Economics; Work (physics); Market power; Mathematical economics; Electric power system; Operations research; Mathematical optimization; Power (physics); Engineering; Mathematics","score_opus":0.01453428199598955,"score_gpt":0.19806629931967523,"score_spread":0.18353201732368568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135395455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008605152,0.0002972881,0.9848962,0.00006776808,0.0018741786,0.0013956495,0.000042139236,0.00031346854,0.002508143],"genre_scores_gemma":[0.99800867,0.000021338536,0.00017595528,0.000010911176,0.0000155858,0.00028219522,0.0000038564854,0.000064879605,0.0014165846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877995,0.0000864325,0.00041726668,0.00017653866,0.00026560895,0.00027420104],"domain_scores_gemma":[0.9991582,0.0001657273,0.000110155044,0.0003934963,0.00011798359,0.000054419077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023257037,0.0002100758,0.0002560762,0.00021387832,0.00010467139,0.000045240995,0.00016026599,0.00009454448,0.000043471748],"category_scores_gemma":[0.0000027930857,0.00015945654,0.000081252365,0.00057988026,0.00003017768,0.00017938121,5.247078e-7,0.00015046138,0.000013275224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008879463,0.00011260842,0.000017874954,0.00028767766,0.0003472786,0.0000011488938,0.0008733004,0.9932415,0.0027192922,0.00004657825,0.0019289936,0.00033494912],"study_design_scores_gemma":[0.0014367559,0.0004082205,0.000044767232,0.00031378935,0.0001366598,0.000058467733,0.0004659674,0.97721654,0.015651837,0.0000018098015,0.003976424,0.0002887385],"about_ca_topic_score_codex":0.000030411878,"about_ca_topic_score_gemma":0.00000825181,"teacher_disagreement_score":0.98940355,"about_ca_system_score_codex":0.00013946356,"about_ca_system_score_gemma":0.000010160163,"threshold_uncertainty_score":0.6502449},"labels":[],"label_agreement":null},{"id":"W2137583011","doi":"10.1109/tpwrs.2007.901089","title":"Data Mining Approach to Threshold Settings of Islanding Relays in Distributed Generation","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Islanding Detection in Power Systems","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Islanding; Distributed generation; Relay; Computer science; Network topology; Protective relay; Resource (disambiguation); Electric power system; Distributed computing; Set (abstract data type); Data mining; Engineering; Power (physics); Computer network; Electrical engineering","score_opus":0.03549859890426016,"score_gpt":0.2501801638999405,"score_spread":0.21468156499568036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137583011","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06419761,0.000100370366,0.92402333,0.000008256451,0.0057738023,0.0006673464,0.0003880469,0.00027316235,0.0045681032],"genre_scores_gemma":[0.99877787,0.0000037330983,0.0007876982,0.000009571132,0.0000676053,0.000077567696,0.00006429746,0.000062588355,0.00014906935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790585,0.000046965422,0.00085603737,0.00041887816,0.00037005811,0.00040221482],"domain_scores_gemma":[0.9988398,0.000096384654,0.00009747798,0.0008086744,0.000055116907,0.0001025423],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012777727,0.00024415646,0.00036532927,0.0006457434,0.00009603646,0.0000664568,0.00036406136,0.00019921034,0.000007638402],"category_scores_gemma":[0.000011257657,0.0002604673,0.00005767042,0.00089703733,0.00002029849,0.00025751803,0.0000036068914,0.0002945176,0.000024056675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061792714,0.00015888423,0.00040302912,0.0003656802,0.00015903331,0.000013239845,0.0047897594,0.95564467,0.02914613,0.000101765305,0.008901735,0.00025428308],"study_design_scores_gemma":[0.001407364,0.00021479462,0.0002937605,0.00081565225,0.00006589745,0.00017019545,0.004689097,0.9481486,0.033197343,0.0000020966813,0.010041968,0.0009532134],"about_ca_topic_score_codex":0.000080348655,"about_ca_topic_score_gemma":0.00012328694,"teacher_disagreement_score":0.93458027,"about_ca_system_score_codex":0.00030068253,"about_ca_system_score_gemma":0.000017663275,"threshold_uncertainty_score":0.99998474},"labels":[],"label_agreement":null},{"id":"W2138663913","doi":"10.1109/tpwrs.2003.810898","title":"The existence of multiple power flow solutions in unbalanced three-phase circuits","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Merge (version control); Electronic circuit; Phenomenon; Power flow; Control theory (sociology); Voltage; Electric power system; Computer science; Flow (mathematics); Electrical network; Three-phase; Power (physics); Mathematics; Engineering; Electrical engineering; Physics; Control (management)","score_opus":0.018868342513280324,"score_gpt":0.23083044181683424,"score_spread":0.21196209930355392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138663913","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040128876,0.00068989216,0.95069987,0.000025135016,0.0040633734,0.0006061581,0.00031394893,0.00020734595,0.003265423],"genre_scores_gemma":[0.99958456,0.000030357573,0.000099801626,0.0000050211574,0.000005018972,0.00014376962,0.00000498594,0.000038116716,0.00008836583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832135,0.00009117428,0.0005631732,0.00024421597,0.0002945363,0.00048552014],"domain_scores_gemma":[0.99902326,0.00017629874,0.0000632324,0.0005369276,0.000103395425,0.00009686725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039495373,0.00023624553,0.0002803551,0.00014015244,0.00019677155,0.000050108738,0.00021553434,0.0001452483,0.000034805198],"category_scores_gemma":[0.000028516448,0.00021170969,0.000134138,0.00055288535,0.00009245273,0.00019140528,8.061908e-7,0.00032488155,0.000075613],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005763997,0.00060824223,0.00013308923,0.00010729369,0.00016216307,0.000014490238,0.00071548554,0.97667277,0.017803922,0.0016806134,0.0007561302,0.0012881526],"study_design_scores_gemma":[0.0076354994,0.000900889,0.0012678741,0.0007149437,0.000102663595,0.000121311,0.0020797807,0.93177617,0.03590804,0.00016542053,0.017860781,0.0014666296],"about_ca_topic_score_codex":0.000043423825,"about_ca_topic_score_gemma":0.0002663856,"teacher_disagreement_score":0.95945567,"about_ca_system_score_codex":0.0002476065,"about_ca_system_score_gemma":0.000048519905,"threshold_uncertainty_score":0.863327},"labels":[],"label_agreement":null},{"id":"W2139535657","doi":"10.1109/tpwrs.2005.856996","title":"Novel Controllers for the 48-Pulse VSC STATCOM and SSSC for Voltage Regulation and Reactive Power Compensation","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":207,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Control theory (sociology); AC power; Static VAR compensator; Electric power system; Compensation (psychology); Voltage source; Thyristor; MATLAB; Computer science; Voltage; Engineering; Power (physics); Electrical engineering; Control (management); Physics","score_opus":0.013753493814001403,"score_gpt":0.22534265174681678,"score_spread":0.21158915793281538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139535657","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005106931,0.00027435066,0.9893238,0.0002513091,0.001678453,0.002316818,0.00036589635,0.00017031138,0.0005121483],"genre_scores_gemma":[0.99810696,0.000018798648,0.00076372235,0.00005034767,0.00001621242,0.00044256772,0.000010654568,0.000042699598,0.0005480224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99889934,0.000035546484,0.00041479577,0.00026765023,0.00015856785,0.00022408657],"domain_scores_gemma":[0.9988896,0.00051801,0.00008483423,0.00026757453,0.0001522996,0.00008764573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004301903,0.00021547408,0.00029167568,0.0001051724,0.0002825401,0.00011889215,0.00007140964,0.00012424971,0.000024272626],"category_scores_gemma":[0.000013188057,0.00017746595,0.00008976607,0.00010184651,0.00005601246,0.00029095827,7.4021875e-7,0.00011215886,0.000004213323],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007959174,0.0002242424,0.000044593235,0.00035021163,0.00058576773,3.0649912e-7,0.007919813,0.96966213,0.013398252,0.0023376644,0.002405489,0.0022756332],"study_design_scores_gemma":[0.0035175981,0.00013626389,0.00077417964,0.0000604354,0.00009673177,0.000018602439,0.0015914054,0.96224946,0.0012359207,0.000017506298,0.029976176,0.00032569456],"about_ca_topic_score_codex":0.00003979559,"about_ca_topic_score_gemma":0.0001151226,"teacher_disagreement_score":0.99300003,"about_ca_system_score_codex":0.0001455701,"about_ca_system_score_gemma":0.000018984076,"threshold_uncertainty_score":0.7236851},"labels":[],"label_agreement":null},{"id":"W2141175331","doi":"10.1109/tpwrs.2003.821441","title":"Determining Rational Redundancy of 500-kV Reactors in Transmission Systems Using a Probability-Based Economic Analysis Approach: BCTC's Practice","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Unavailability; Redundancy (engineering); Reliability engineering; Probabilistic logic; Electric power system; Power transmission; Transmission system; Electric power transmission; Electric power industry; Computer science; Engineering; Transmission (telecommunications); Electricity; Power (physics); Electrical engineering","score_opus":0.018692920180526755,"score_gpt":0.2363148887579004,"score_spread":0.21762196857737365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141175331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.095437236,0.0003078494,0.9000463,0.000023369812,0.0016934024,0.0010769848,0.00008809081,0.00018557442,0.0011412065],"genre_scores_gemma":[0.99624765,0.000015918053,0.0034364238,0.000007840281,0.00001681924,0.00019504323,0.000009352101,0.000054159646,0.00001676913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99702716,0.00029171322,0.0013224762,0.0005527603,0.0003829114,0.00042295898],"domain_scores_gemma":[0.9985454,0.00026839564,0.00026949093,0.00064065243,0.000120209406,0.00015583597],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011006239,0.00037328087,0.0008172634,0.0007583781,0.00010745871,0.00008655316,0.00024308624,0.00027603217,0.000008607641],"category_scores_gemma":[0.000018360091,0.0003758628,0.0003466046,0.00085318286,0.000081498154,0.0005519229,0.0000010659412,0.00037962975,0.00000828487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007765477,0.00028235302,0.00007382838,0.00067441404,0.00030583798,0.0000068080726,0.0010621413,0.99493295,0.002302686,0.00021969885,0.0000036883046,0.000057911893],"study_design_scores_gemma":[0.0017614923,0.00020079072,0.00014668255,0.0010746999,0.00050379895,0.000081677485,0.0012370552,0.98821574,0.0049110814,0.0000271805,0.0011919742,0.00064780086],"about_ca_topic_score_codex":0.0014219589,"about_ca_topic_score_gemma":0.00009862238,"teacher_disagreement_score":0.9008104,"about_ca_system_score_codex":0.001216097,"about_ca_system_score_gemma":0.00029863775,"threshold_uncertainty_score":0.99986935},"labels":[],"label_agreement":null},{"id":"W2141342136","doi":"10.1109/tpwrs.2008.922225","title":"Passivity Enforcement Using an Infeasible-Interior-Point Primal-Dual Method","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electromagnetic Simulation and Numerical Methods","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Passivity; Admittance; Computer science; Dual (grammatical number); Point (geometry); Mathematical optimization; Interior point method; Quadratic equation; Quadratic programming; Control theory (sociology); Mathematics; Engineering; Artificial intelligence; Electrical impedance; Control (management)","score_opus":0.04389169797328125,"score_gpt":0.30948930146836784,"score_spread":0.2655976034950866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141342136","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08787325,0.000060672915,0.9071634,0.000010853713,0.0018694099,0.0003395003,0.000012508323,0.00043481152,0.002235636],"genre_scores_gemma":[0.9776874,0.000015998181,0.021846546,0.000050396247,0.000029870007,0.000047565743,0.0000015193687,0.000055469307,0.00026520083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835074,0.00026594065,0.00045343448,0.0002750093,0.0002991735,0.00035568996],"domain_scores_gemma":[0.99915814,0.00013985841,0.00005513786,0.0003740523,0.00006542302,0.00020739574],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031587965,0.00025924403,0.00034180796,0.00019599903,0.00018645321,0.000044550066,0.00010819006,0.00013224271,0.0003906533],"category_scores_gemma":[0.000005350429,0.00025464126,0.00012719409,0.00031449262,0.000036987818,0.00022472675,9.586307e-7,0.00028729433,0.00003652549],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004804311,0.00014997914,0.000023304472,0.00005708651,0.00010942861,0.000020103584,0.0011270634,0.92665714,0.069016986,0.00010612232,0.00006367242,0.002621044],"study_design_scores_gemma":[0.0008230122,0.0006976456,0.00018718961,0.00007215137,0.00005336767,0.0003276761,0.00020480964,0.92439675,0.069806956,0.000012783388,0.00290684,0.0005108006],"about_ca_topic_score_codex":0.00018692252,"about_ca_topic_score_gemma":0.0000072252155,"teacher_disagreement_score":0.8898142,"about_ca_system_score_codex":0.00022789434,"about_ca_system_score_gemma":0.000037360533,"threshold_uncertainty_score":0.9999906},"labels":[],"label_agreement":null},{"id":"W2141394237","doi":"10.1109/tpwrs.2008.926081","title":"Fuzzy Models of Overhead Power Line Weather-Related Outages","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TransCanada (Canada)","funders":"","keywords":"Unavailability; Overhead (engineering); Fuzzy logic; Reliability engineering; Overhead line; Electric power system; Electric power transmission; Computer science; Line (geometry); Power (physics); Engineering; Electrical engineering; Mathematics; Artificial intelligence","score_opus":0.015876904408087422,"score_gpt":0.20608669216018385,"score_spread":0.19020978775209643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141394237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09452587,0.0015231237,0.862357,0.00005189811,0.0075126207,0.00070060126,0.00022037429,0.0007683328,0.032340176],"genre_scores_gemma":[0.99589086,0.00017626972,0.00007127143,0.000016529193,0.000010138615,0.00006995247,0.0000020212508,0.000075451855,0.0036875373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99799055,0.00007926724,0.00080153585,0.00033102822,0.00038499848,0.00041264604],"domain_scores_gemma":[0.99882907,0.00009558512,0.00009680575,0.00069849024,0.00013204024,0.00014799104],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025629296,0.00033512848,0.000577487,0.00021777346,0.00011141921,0.0000176761,0.0002521479,0.00028283603,0.00006820007],"category_scores_gemma":[0.0000044524313,0.00031230354,0.00027250062,0.00034818015,0.00011090554,0.00028671388,0.0000012795915,0.0003625623,0.00016060309],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050863433,0.00026863607,0.000013531944,0.00026301466,0.0002957603,0.00003062158,0.0037677782,0.988038,0.0047578956,0.0008057696,0.0016413816,0.00006676901],"study_design_scores_gemma":[0.014717474,0.0054432666,0.0007830575,0.007522902,0.0006718309,0.003323979,0.006835893,0.74672216,0.13296366,0.002280247,0.07081663,0.007918898],"about_ca_topic_score_codex":0.0001474783,"about_ca_topic_score_gemma":0.000017447259,"teacher_disagreement_score":0.901365,"about_ca_system_score_codex":0.00014148802,"about_ca_system_score_gemma":0.00004209637,"threshold_uncertainty_score":0.9999329},"labels":[],"label_agreement":null},{"id":"W2142690892","doi":"10.1109/tpwrs.2009.2021200","title":"Real-Time Simulation of a Wind Energy System Based on the Doubly-Fed Induction Generator","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Turbine; Wind power; Transient (computer programming); Control theory (sociology); Computer science; Variable speed wind turbine; Real-time simulation; Induction generator; MATLAB; Controller (irrigation); Control engineering; Engineering; Permanent magnet synchronous generator; Simulation; Voltage; Electrical engineering; Control (management)","score_opus":0.009665876557299296,"score_gpt":0.20695671688688763,"score_spread":0.19729084032958832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142690892","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07491366,0.000061389386,0.9018657,0.0000981527,0.0031767888,0.0010240696,0.000060860202,0.0009048201,0.017894544],"genre_scores_gemma":[0.9992285,0.000003899222,0.00001622855,0.000036093617,0.00008740735,0.000055322,0.0000072212238,0.000052538908,0.00051278813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979402,0.00025349332,0.00072351436,0.0002882063,0.0005223387,0.00027224314],"domain_scores_gemma":[0.99871093,0.00022706084,0.00017019529,0.00063113583,0.00015188275,0.000108810804],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035775107,0.0003144408,0.00043256846,0.00031819902,0.00017666815,0.00010443514,0.00017248899,0.00022961089,0.00006791389],"category_scores_gemma":[0.0000036768793,0.00024719918,0.00020587607,0.00045651663,0.000023413595,0.00018323015,3.133408e-7,0.00017467058,0.000089453024],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107443506,0.00006670608,9.659872e-7,0.000043266584,0.00006803129,0.00000186328,0.00011935326,0.96867627,0.029922323,0.0004159743,0.0001916323,0.00038615652],"study_design_scores_gemma":[0.0008236045,0.00025792565,0.00005049811,0.00022237013,0.00004270504,0.000005559452,0.00013447567,0.9898528,0.0073299906,0.0000025776374,0.0010408026,0.00023672363],"about_ca_topic_score_codex":0.00014320017,"about_ca_topic_score_gemma":0.00000413459,"teacher_disagreement_score":0.92431486,"about_ca_system_score_codex":0.00026819253,"about_ca_system_score_gemma":0.00003983778,"threshold_uncertainty_score":0.99999803},"labels":[],"label_agreement":null},{"id":"W2142727519","doi":"10.1109/tpwrs.2006.882454","title":"Multivariable Adaptive Control of Synchronous Machines in a Multimachine Power System","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Multivariable calculus; Control theory (sociology); Electric power system; Controller (irrigation); Subspace topology; Control engineering; Adaptive control; Stability (learning theory); Computer science; Model predictive control; Projection (relational algebra); Engineering; Power (physics); Control (management); Artificial intelligence; Algorithm","score_opus":0.004613481707648214,"score_gpt":0.18848204301603969,"score_spread":0.18386856130839146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142727519","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011625694,0.00051648216,0.9735801,0.0000072953344,0.0027140323,0.0010255905,0.00038926222,0.00048253933,0.009658982],"genre_scores_gemma":[0.9990824,0.0000026811024,0.0004377204,0.0000052474156,0.000007291352,0.00018703986,0.0000045062134,0.00006495769,0.00020817417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977342,0.0002096291,0.0010017558,0.00035011725,0.00031859364,0.00038569793],"domain_scores_gemma":[0.99897194,0.00018545016,0.00012970984,0.00049037166,0.00012821017,0.000094298885],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041299834,0.0003606506,0.0007112104,0.0003689137,0.00007599374,0.000038695034,0.00019358666,0.00020574285,0.00007646227],"category_scores_gemma":[0.000004885909,0.0003407569,0.00017046432,0.00044719927,0.000050578055,0.00019259995,9.3668143e-7,0.00027800308,0.000043008517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000101423015,0.00026413897,0.00036415385,0.00026821348,0.00009150389,0.000011855687,0.0003564619,0.99654174,0.0014746937,0.0004208568,0.00007558928,0.000029374043],"study_design_scores_gemma":[0.0024346379,0.00013252036,0.00066979846,0.00034684697,0.00003218116,0.00003351307,0.0004102732,0.9942058,0.0010824462,0.000002130406,0.00028547092,0.0003643913],"about_ca_topic_score_codex":0.0020762195,"about_ca_topic_score_gemma":0.00024825867,"teacher_disagreement_score":0.9874567,"about_ca_system_score_codex":0.0004326544,"about_ca_system_score_gemma":0.000039251947,"threshold_uncertainty_score":0.99990445},"labels":[],"label_agreement":null},{"id":"W2142781661","doi":"10.1109/tpwrs.2002.1007908","title":"PMU configuration for system dynamic performance measurement in large, multiarea power systems","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":115,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Phasor; Electric power system; Phasor measurement unit; Units of measurement; Grid; Computer science; Electronic engineering; Transformer; Transmission system; Transmission line; Transient (computer programming); Engineering; Electric power transmission; Transmission (telecommunications); Voltage; Control theory (sociology); Power (physics); Electrical engineering","score_opus":0.018938865234378613,"score_gpt":0.20715060172456912,"score_spread":0.18821173649019052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142781661","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066225007,0.0009981991,0.9746774,0.000019275682,0.008937504,0.0025279834,0.00026141122,0.0007530875,0.0052026766],"genre_scores_gemma":[0.9980363,0.000039669994,0.000055491928,0.000009611877,0.0000051408124,0.0011350051,0.000010000408,0.00008987096,0.0006188897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970159,0.00017392446,0.0010939959,0.000478467,0.0006387003,0.00059901236],"domain_scores_gemma":[0.9986645,0.000079338824,0.00013192103,0.0006295193,0.00032726026,0.00016745286],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009566118,0.00042629,0.0005938691,0.00038920486,0.00021640578,0.00016253229,0.00022669713,0.00027947177,0.00007750162],"category_scores_gemma":[0.000009326926,0.0004290858,0.00017117885,0.000411106,0.000024774443,0.000369948,9.2710263e-7,0.00027446361,0.000184102],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046955047,0.0002563781,0.000065857654,0.0016704286,0.00013115916,0.000004591408,0.0014774713,0.99490196,0.00065942743,0.00017504192,0.0005543217,0.00005640524],"study_design_scores_gemma":[0.0015664323,0.00013801815,0.00016135735,0.00068416406,0.000028954182,0.000030722258,0.0014913006,0.98967606,0.00043772694,1.278667e-7,0.0053285994,0.00045656378],"about_ca_topic_score_codex":0.000045408746,"about_ca_topic_score_gemma":0.00010737925,"teacher_disagreement_score":0.99141383,"about_ca_system_score_codex":0.0013362198,"about_ca_system_score_gemma":0.000027478653,"threshold_uncertainty_score":0.9998161},"labels":[],"label_agreement":null},{"id":"W2142815812","doi":"10.1109/tpwrs.2006.881158","title":"On the Quantification of the Network Capacity Deferral Value of Distributed Generation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":180,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Deferral; Distributed generation; Reliability engineering; Transformer; Electricity; Risk analysis (engineering); Reliability (semiconductor); Electricity market; Computer science; Environmental economics; Cost–benefit analysis; Business; Engineering; Power (physics); Economics; Renewable energy; Electrical engineering; Finance","score_opus":0.019716501689687558,"score_gpt":0.20456527894740134,"score_spread":0.1848487772577138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142815812","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30392775,0.000055374785,0.6884937,0.00003021139,0.0064614303,0.00044934292,0.00012768633,0.00009211368,0.00036233017],"genre_scores_gemma":[0.99969155,0.0000022417669,0.000016015612,0.000004878895,0.000076559154,0.00008708372,0.0000070057054,0.00002819239,0.000086502994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851155,0.00023244279,0.00055723754,0.00016473819,0.00034781155,0.00018620263],"domain_scores_gemma":[0.99899143,0.00011965036,0.0001725204,0.00059843424,0.00009435244,0.000023639794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003776496,0.00017176778,0.0002157881,0.000054836964,0.00016909147,0.00002847644,0.00019399634,0.00013633385,0.000009797238],"category_scores_gemma":[0.00000682614,0.00011641816,0.00015629294,0.00046930969,0.00007135835,0.00007945059,6.180886e-7,0.00021888087,0.000014290162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011331381,0.000049921327,0.000035180932,0.00004498328,0.00005330421,8.413723e-8,0.0001012144,0.95251733,0.04073556,0.0037137163,0.002712019,0.000025353624],"study_design_scores_gemma":[0.00047691018,0.00015490974,0.0034690716,0.00036087385,0.0001067789,0.000024162573,0.00014518115,0.5551037,0.4359003,0.00014679179,0.0037442576,0.00036702602],"about_ca_topic_score_codex":0.00057532714,"about_ca_topic_score_gemma":0.00021287211,"teacher_disagreement_score":0.69576377,"about_ca_system_score_codex":0.0001467158,"about_ca_system_score_gemma":0.000016120248,"threshold_uncertainty_score":0.47473946},"labels":[],"label_agreement":null},{"id":"W2143375247","doi":"10.1109/tpwrs.2003.811006","title":"Medium-term hydrothermal coordination by semidefinite programming","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Advanced Optimization Algorithms Research","field":"Mathematics","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Arizona State University","keywords":"Semidefinite programming; Mathematical optimization; Relaxation (psychology); Mathematics; Integer programming; Integer (computer science); Convex optimization; Lagrangian relaxation; Polynomial; Regular polygon; Computer science","score_opus":0.03044916406546083,"score_gpt":0.3128030320301395,"score_spread":0.28235386796467865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143375247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014357147,0.00011690928,0.9926364,0.00008555997,0.0010140288,0.00097488426,0.00004796591,0.00030181857,0.003386751],"genre_scores_gemma":[0.9758068,0.000020192576,0.012075117,0.00003279073,0.0000121519115,0.00044077064,0.000006992606,0.00010281376,0.011502423],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.997779,0.00027184215,0.0004923143,0.00037061435,0.00064904796,0.00043717978],"domain_scores_gemma":[0.99868065,0.00036431852,0.00015298354,0.00042592137,0.00020405043,0.0001720697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005330958,0.00025010042,0.0002902586,0.00023593122,0.0002665183,0.00011623484,0.00017735136,0.00016816605,0.0003307718],"category_scores_gemma":[0.0000639652,0.00024400507,0.00010508571,0.0004883085,0.00007279907,0.00028904388,8.780809e-7,0.00035110157,0.00013696279],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001264677,0.024700653,0.0005940435,0.005955598,0.004977099,0.0005284984,0.030738097,0.531109,0.08024996,0.14645725,0.10095949,0.07246564],"study_design_scores_gemma":[0.020987837,0.0033311313,0.000034998797,0.0023358439,0.00060322694,0.001263522,0.008307425,0.1991161,0.3498035,0.0052742218,0.401662,0.007280198],"about_ca_topic_score_codex":0.000012198499,"about_ca_topic_score_gemma":0.0000058767746,"teacher_disagreement_score":0.98056126,"about_ca_system_score_codex":0.00020561511,"about_ca_system_score_gemma":0.00006922481,"threshold_uncertainty_score":0.99502385},"labels":[],"label_agreement":null},{"id":"W2143695659","doi":"10.1109/tpwrs.2006.881126","title":"Slow-Coherency-Based Controlled Islanding—A Demonstration of the Approach on the August 14, 2003 Blackout Scenario","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Islanding Detection in Power Systems","field":"Engineering","cited_by":192,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Blackout; Islanding; Load Shedding; Control theory (sociology); Voltage; Interconnection; Generator (circuit theory); Computer science; Electric power transmission; Automatic frequency control; Reduction (mathematics); Electric power system; Engineering; Power (physics); Control (management); Electrical engineering; Telecommunications; Mathematics; Physics","score_opus":0.008697234314654556,"score_gpt":0.18372807217786855,"score_spread":0.175030837863214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143695659","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019960072,0.00013689481,0.8951391,0.0000660111,0.012523558,0.002481373,0.00010033606,0.000440243,0.06915242],"genre_scores_gemma":[0.99475867,0.0000019469894,0.00003472149,0.00002563274,0.00007361028,0.0005094181,0.000003852476,0.00007453319,0.0045175906],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974623,0.00033523972,0.0008541315,0.00031793298,0.0006526302,0.00037780104],"domain_scores_gemma":[0.9984512,0.00026040094,0.0002346849,0.0008129111,0.0001889857,0.000051815514],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000648062,0.00038521003,0.000521281,0.00025443916,0.00044087908,0.0001783986,0.00038257276,0.00026715212,0.000075791155],"category_scores_gemma":[0.000013353531,0.00024053836,0.000304337,0.0008196087,0.00013879275,0.000095744836,9.680829e-7,0.0005433122,0.00008453094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022231477,0.00028010772,0.00018336713,0.000189838,0.0002827167,0.0000019614852,0.00045828405,0.97006196,0.004167614,0.001778608,0.022345632,0.000027593222],"study_design_scores_gemma":[0.014595481,0.0007517488,0.0007620899,0.0016432877,0.00053221063,0.00013995617,0.0013104114,0.85968107,0.100964986,0.00006777262,0.017684866,0.0018661394],"about_ca_topic_score_codex":0.00024841522,"about_ca_topic_score_gemma":0.00009663307,"teacher_disagreement_score":0.9747986,"about_ca_system_score_codex":0.0002561683,"about_ca_system_score_gemma":0.000105020976,"threshold_uncertainty_score":0.98088694},"labels":[],"label_agreement":null},{"id":"W2146845812","doi":"10.1109/tpwrs.2007.907383","title":"Automatic Segmentation of Large Power Systems Into Fuzzy Coherent Areas for Dynamic Vulnerability Assessment","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":112,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Hydro-Québec","funders":"","keywords":"Initialization; Electric power system; Phasor measurement unit; Computer science; Cluster analysis; Fuzzy logic; Vulnerability (computing); Data mining; Phasor; Fuzzy clustering; Units of measurement; Set (abstract data type); Fuzzy set; Power (physics); Artificial intelligence","score_opus":0.00949918997693194,"score_gpt":0.2848725987692824,"score_spread":0.27537340879235045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146845812","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06584536,0.00023331495,0.9217118,0.000018610479,0.007224369,0.0025740932,0.0003224147,0.0005041974,0.0015658103],"genre_scores_gemma":[0.99816513,0.0000068756353,0.001007087,0.000011721018,0.0000051137363,0.0005174681,0.000032945518,0.00007117145,0.00018246696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9969399,0.00020353028,0.0013916284,0.00042237685,0.00055422314,0.0004883164],"domain_scores_gemma":[0.99825066,0.00032478603,0.0002323574,0.0006916151,0.00029957955,0.0002009776],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001846565,0.00037867035,0.0006489983,0.00030498244,0.00019639063,0.0000885222,0.00021130648,0.00023552262,0.00011027086],"category_scores_gemma":[0.000011483346,0.00036968553,0.00024917652,0.00038293426,0.0000480341,0.00025066952,0.0000017345508,0.00023899435,0.000019847896],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015295608,0.0016406092,0.0008194454,0.0057746433,0.0008604403,0.000005878462,0.0052225254,0.9748533,0.007878683,0.0012585294,0.0008538058,0.0006792047],"study_design_scores_gemma":[0.0024541747,0.00047862405,0.002161986,0.0004984672,0.00013423552,0.000023597382,0.005282332,0.98342365,0.0030069167,0.000027087013,0.001769395,0.00073951314],"about_ca_topic_score_codex":0.000091576825,"about_ca_topic_score_gemma":0.00017368783,"teacher_disagreement_score":0.93231976,"about_ca_system_score_codex":0.001006749,"about_ca_system_score_gemma":0.0000740628,"threshold_uncertainty_score":0.9998755},"labels":[],"label_agreement":null},{"id":"W2146926333","doi":"10.1109/tpwrs.2012.2230029","title":"Security-Constrained Unit Commitment With Uncertain Wind Generation: The Loadability Set Approach","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Economic dispatch; Mathematical optimization; Electric power system; Set (abstract data type); Wind power; Software deployment; Reliability (semiconductor); Computer science; Power (physics); Engineering; Reliability engineering; Mathematics","score_opus":0.024220335845104336,"score_gpt":0.2230311499502254,"score_spread":0.19881081410512108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146926333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018695608,0.00042238872,0.97029054,0.0000716384,0.002227662,0.0013003242,0.00007688665,0.0003993682,0.0065155863],"genre_scores_gemma":[0.99900866,0.000010224763,0.00026618195,0.000034498335,0.000078869096,0.00024256029,0.000024526762,0.000056574187,0.00027791885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815446,0.00028748685,0.00042419188,0.0002501856,0.00041712372,0.0004665664],"domain_scores_gemma":[0.998905,0.0001050061,0.000072483504,0.0006641433,0.00009562824,0.00015776312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006414899,0.0003192811,0.00028913407,0.00012431212,0.000287289,0.00011184546,0.00021306424,0.00015296611,0.00005219545],"category_scores_gemma":[0.0000023950226,0.00022749545,0.00007907885,0.0005719753,0.000080821,0.00030833474,8.803001e-7,0.00036581303,0.000044152737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020245432,0.00018436187,0.0001602353,0.00011038027,0.00025045834,0.0000014874583,0.0029311287,0.9946043,0.00022264822,0.00034503223,0.0010988377,0.000070919734],"study_design_scores_gemma":[0.0018563224,0.00040677655,0.00015386223,0.0001439832,0.0002672849,0.000518235,0.0036259757,0.9698694,0.0065678474,0.0000071433083,0.015399527,0.0011836395],"about_ca_topic_score_codex":0.00006958109,"about_ca_topic_score_gemma":0.00002308893,"teacher_disagreement_score":0.98031306,"about_ca_system_score_codex":0.0002828985,"about_ca_system_score_gemma":0.000051295032,"threshold_uncertainty_score":0.9276995},"labels":[],"label_agreement":null},{"id":"W2146973638","doi":"10.1109/tpwrs.2007.901308","title":"Re-examination of Synchronous Machine Modeling Techniques for Electromagnetic Transient Simulations","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":84,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reactance; Emtp; Transient (computer programming); Electric power system; Discretization; Computer science; Control theory (sociology); Synchronous motor; Time domain; Voltage; Control engineering; Power (physics); Electronic engineering; Engineering; Electrical engineering; Mathematics; Physics; Artificial intelligence","score_opus":0.009187868292207198,"score_gpt":0.23385680861493782,"score_spread":0.22466894032273063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146973638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03094987,0.00026311007,0.9632387,0.000011366641,0.00073138863,0.0012674262,0.00007558758,0.00044761514,0.0030149147],"genre_scores_gemma":[0.99906784,0.000011076579,0.0005577826,0.00000744596,0.000024979194,0.00010811084,0.000012572533,0.000060821214,0.00014935754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846673,0.00004666091,0.0007252088,0.00020930675,0.00025977197,0.0002923416],"domain_scores_gemma":[0.9992047,0.00018802096,0.00007499996,0.00028317125,0.00016790521,0.00008119237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046952075,0.00021262627,0.00032012514,0.00038760915,0.000105912804,0.000036991678,0.0001068704,0.00015640176,0.000025863583],"category_scores_gemma":[0.0000038429644,0.00022006225,0.00015459565,0.00026996978,0.000016613049,0.00015741262,2.3007826e-7,0.00013511171,0.0000054564157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039664425,0.00007430513,0.0000011439299,0.00014386623,0.000067493114,6.395867e-7,0.00044986611,0.96472245,0.030859366,0.00007086685,0.000010725829,0.0035595961],"study_design_scores_gemma":[0.00059319806,0.00030687943,0.000019252766,0.000098163335,0.000052846062,0.0000049259042,0.0002482465,0.9830004,0.015095893,0.000007640191,0.0003664816,0.00020608968],"about_ca_topic_score_codex":0.00006709912,"about_ca_topic_score_gemma":0.00010333176,"teacher_disagreement_score":0.968118,"about_ca_system_score_codex":0.00016255416,"about_ca_system_score_gemma":0.00001720712,"threshold_uncertainty_score":0.89738786},"labels":[],"label_agreement":null},{"id":"W2148799066","doi":"10.1109/tpwrs.2002.1007907","title":"Control loops selection to damp inter-area oscillations of electrical networks","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Observability; Controllability; Control theory (sociology); Stability (learning theory); Electric power system; Computer science; Singular value; Selection (genetic algorithm); Control (management); Power (physics); Mathematics; Artificial intelligence","score_opus":0.011239099088674542,"score_gpt":0.19740340681973123,"score_spread":0.1861643077310567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148799066","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024912257,0.0001315268,0.99015516,0.000040035513,0.002506105,0.00063629914,0.00005510165,0.0004141879,0.0035703504],"genre_scores_gemma":[0.99914587,0.000011328299,0.00012469984,0.000032477037,0.000011481402,0.00010976497,0.0000019226993,0.000038795708,0.00052368554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985014,0.00011408318,0.00059169554,0.00025379137,0.00023524658,0.00030375365],"domain_scores_gemma":[0.99916565,0.00012362438,0.0000583085,0.0003196844,0.00015736601,0.00017533863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018792052,0.00021567245,0.00036346004,0.0002956109,0.0001067531,0.000050410305,0.00013433132,0.00016552238,0.00036651982],"category_scores_gemma":[0.000009543113,0.00021895606,0.00013760792,0.0008238882,0.000021598702,0.00013250296,5.005216e-7,0.00023715172,0.00008262645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018457748,0.0001041689,0.000119874974,0.000025177467,0.00008490443,6.018857e-7,0.0002681025,0.9965325,0.00033519487,0.00006730523,0.0022584815,0.0001852039],"study_design_scores_gemma":[0.0004613536,0.00017874817,0.00009300762,0.000053607288,0.000029878442,0.000018983425,0.00004410148,0.99412686,0.0004130506,8.35452e-7,0.004364648,0.00021495504],"about_ca_topic_score_codex":0.00003805732,"about_ca_topic_score_gemma":0.000048019017,"teacher_disagreement_score":0.9966546,"about_ca_system_score_codex":0.00021444658,"about_ca_system_score_gemma":0.00001049954,"threshold_uncertainty_score":0.8928769},"labels":[],"label_agreement":null},{"id":"W2148835898","doi":"10.1109/tpwrs.2008.2007001","title":"A Generic Operations Framework for Discos in Retail Electricity Markets","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Abdulaziz City for Science and Technology","keywords":"Electricity; Scheduling (production processes); Grid; Operations research; Electricity market; Computer science; Electricity retailing; Context (archaeology); Operations management; Engineering","score_opus":0.01225402772100849,"score_gpt":0.2263664480501993,"score_spread":0.2141124203291908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2148835898","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074066906,0.00048304375,0.98716027,0.00010070272,0.0019457757,0.0012943043,0.00003897563,0.00043684113,0.0011333944],"genre_scores_gemma":[0.995423,0.000080478465,0.0033989225,0.000060936716,0.00002959279,0.00046040356,0.0000070101155,0.00005606023,0.00048360156],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833995,0.00009267478,0.0005539077,0.00032403076,0.0002303154,0.00045909098],"domain_scores_gemma":[0.99924386,0.00013569243,0.00003908241,0.00040804708,0.000072730996,0.00010056738],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002767943,0.00027303136,0.0003463677,0.00043504048,0.00013728424,0.00011609263,0.00019479833,0.00024445992,0.000029866842],"category_scores_gemma":[0.000016230944,0.0002856878,0.000119184726,0.0010443799,0.000010366445,0.0002600784,2.8305686e-7,0.00033174903,0.000029080657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004198374,0.00014234902,0.000008367132,0.00005359497,0.000051351733,0.0000042068,0.00033752093,0.9950493,0.001666219,0.0008920125,0.0005493499,0.0012037575],"study_design_scores_gemma":[0.0007489058,0.000315331,0.00023119677,0.00023018994,0.000040955973,0.00003745387,0.00006826776,0.9907422,0.005590458,0.00009927016,0.0013521448,0.00054362713],"about_ca_topic_score_codex":0.000024951072,"about_ca_topic_score_gemma":0.000038205388,"teacher_disagreement_score":0.9880163,"about_ca_system_score_codex":0.00038760647,"about_ca_system_score_gemma":0.000047685764,"threshold_uncertainty_score":0.9999595},"labels":[],"label_agreement":null},{"id":"W2149111570","doi":"10.1109/tpwrs.2009.2036265","title":"Rotor Angle Instability Prediction Using Post-Disturbance Voltage Trajectories","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":184,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Engineering and Physical Sciences Research Council","keywords":"Control theory (sociology); Robustness (evolution); Electric power system; Voltage; Computer science; Fuzzy logic; Cluster analysis; Instability; Engineering; Artificial intelligence; Power (physics)","score_opus":0.010165488616204118,"score_gpt":0.21205807252935305,"score_spread":0.20189258391314893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149111570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2551453,0.0000707311,0.7281389,0.0000074936306,0.013196233,0.0007010774,0.00051680155,0.0007816207,0.0014418387],"genre_scores_gemma":[0.99927014,0.0000035785954,0.00024838425,0.0000124812605,0.000029670007,0.00013843173,0.000008530958,0.00005834005,0.00023045207],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99828064,0.00007664275,0.00058042456,0.00038436113,0.00033507662,0.00034286143],"domain_scores_gemma":[0.99878395,0.000071276576,0.00006694072,0.0006892393,0.00020766733,0.00018092114],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034649423,0.0003051759,0.00034106028,0.00015717214,0.00024428248,0.00012201509,0.00018665785,0.00025818538,0.0002211408],"category_scores_gemma":[0.000015888267,0.0003052848,0.0001562236,0.000373074,0.000085473264,0.0004548157,9.691039e-7,0.0005016,0.00003859647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018179565,0.0007468282,0.0032231144,0.0008904657,0.00029142012,0.000011729724,0.005183047,0.81237346,0.17584656,0.00033803438,0.00055674353,0.0003567752],"study_design_scores_gemma":[0.0024619978,0.0005224751,0.010784577,0.0002926293,0.00016442341,0.00020648535,0.0023480593,0.8959928,0.04803964,0.000021772825,0.037178803,0.0019863443],"about_ca_topic_score_codex":0.00020507726,"about_ca_topic_score_gemma":0.0002453705,"teacher_disagreement_score":0.7441248,"about_ca_system_score_codex":0.00023048912,"about_ca_system_score_gemma":0.000062584564,"threshold_uncertainty_score":0.9999399},"labels":[],"label_agreement":null},{"id":"W2149177425","doi":"10.1109/tpwrs.2008.920718","title":"Models for Quantifying the Economic Benefits of Distributed Generation","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":192,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Distributed generation; Economic dispatch; Distributed power generation; Cost–benefit analysis; Economic impact analysis; Industrial organization; Business; Environmental economics; Computer science; Economics; Electric power system; Risk analysis (engineering); Power (physics); Microeconomics; Engineering; Renewable energy","score_opus":0.057028317844124946,"score_gpt":0.23947148229996876,"score_spread":0.1824431644558438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149177425","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15099071,0.00025105992,0.8441417,0.000019937397,0.0023833492,0.00045478815,0.0015152443,0.00013485677,0.00010834018],"genre_scores_gemma":[0.9994996,0.00006301892,0.000120373224,0.000004241392,0.00003207383,0.00015406769,0.00006568896,0.000032234526,0.000028671395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914145,0.00002265408,0.00036733758,0.00015943518,0.000114279566,0.00019484085],"domain_scores_gemma":[0.99949455,0.00006549037,0.000055226385,0.00027741533,0.000064902524,0.000042411284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013026448,0.0001528973,0.00019551216,0.00006691647,0.000188345,0.00002521554,0.00012425946,0.00009628965,0.000008985642],"category_scores_gemma":[0.0000015077786,0.00013470111,0.00012681934,0.000096260075,0.0000341507,0.00021606883,4.240239e-7,0.00010205514,0.000021601742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013622927,0.000018826531,0.0000022509043,0.000027883974,0.000057350935,1.9973344e-7,0.00016046167,0.9956571,0.0020845658,0.00067818613,0.0012158536,0.0000837388],"study_design_scores_gemma":[0.00031527676,0.00007548359,0.000025127662,0.000030461473,0.000027889097,0.000018249451,0.00006259025,0.97473377,0.023965223,0.0000049762907,0.0005924603,0.00014846926],"about_ca_topic_score_codex":0.00005492004,"about_ca_topic_score_gemma":0.00003090052,"teacher_disagreement_score":0.8485089,"about_ca_system_score_codex":0.00021863863,"about_ca_system_score_gemma":0.000029211962,"threshold_uncertainty_score":0.5492952},"labels":[],"label_agreement":null},{"id":"W2149649017","doi":"10.1109/tpwrs.2011.2146796","title":"Large-Scale Solar PV Investment Models, Tools, and Analysis: The Ontario Case","year":2011,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Photovoltaic system; Investment (military); Sizing; Profit (economics); Operations research; Computer science; Return on investment; Environmental economics; Engineering; Mathematical optimization; Industrial engineering; Economics; Microeconomics; Mathematics; Electrical engineering","score_opus":0.022602733099798926,"score_gpt":0.19016241724395372,"score_spread":0.16755968414415479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149649017","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014971098,0.000642738,0.97529906,0.0000087394665,0.0012405931,0.00054181187,0.000080001875,0.00029120743,0.006924732],"genre_scores_gemma":[0.9983442,0.00003629406,0.00043810206,0.000047815556,0.000008034634,0.00017355608,0.000005971228,0.000043458353,0.00090259506],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986042,0.00010332198,0.0004235533,0.00029155044,0.00023121087,0.00034617094],"domain_scores_gemma":[0.9991418,0.000042724896,0.000060400547,0.0005594244,0.00006132701,0.00013431467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000326354,0.0002575779,0.00032196313,0.00028113526,0.00023576496,0.0001144634,0.0001460774,0.00014347608,0.000066202534],"category_scores_gemma":[9.143214e-7,0.00020750133,0.00013736484,0.0005910429,0.000024111114,0.00037027104,0.0000013747251,0.0002944786,0.00002635539],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020364387,0.00014867529,0.0000749249,0.00005762977,0.0016805102,0.00012276144,0.031065185,0.9659935,0.000036195634,0.00028249333,0.0004280258,0.000089734865],"study_design_scores_gemma":[0.0005985827,0.00013427492,0.00012738036,0.000052602496,0.0011612863,0.0007687691,0.002219552,0.9912881,0.0008243331,0.000029025015,0.0023274987,0.00046857804],"about_ca_topic_score_codex":0.00425745,"about_ca_topic_score_gemma":0.018146798,"teacher_disagreement_score":0.98337305,"about_ca_system_score_codex":0.0002566131,"about_ca_system_score_gemma":0.0000358114,"threshold_uncertainty_score":0.99976945},"labels":[],"label_agreement":null},{"id":"W2149906128","doi":"10.1109/tpwrs.2014.2299801","title":"A Hybrid Intelligent Model for Deterministic and Quantile Regression Approach for Probabilistic Wind Power Forecasting","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":203,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Teshmont (Canada)","funders":"National Renewable Energy Laboratory","keywords":"Wind power; Wind power forecasting; Probabilistic forecasting; Probabilistic logic; Support vector machine; Electric power system; Wind speed; Computer science; Particle swarm optimization; Quantile regression; Engineering; Mathematical optimization; Artificial intelligence; Machine learning; Power (physics); Meteorology; Mathematics","score_opus":0.03460675173194757,"score_gpt":0.23671738082360996,"score_spread":0.20211062909166239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2149906128","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03162325,0.00013516906,0.9642396,0.0000045697952,0.0015997231,0.0010354057,0.00014317637,0.00025546236,0.0009636327],"genre_scores_gemma":[0.99325335,0.000006008884,0.0056966054,0.000014455127,0.0000394591,0.00046240786,0.000014640066,0.00010930615,0.0004037712],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984524,0.00003292207,0.00049168686,0.00041200654,0.0001638458,0.0004471148],"domain_scores_gemma":[0.9989933,0.00038352347,0.00008514799,0.00030134822,0.00008385942,0.00015281595],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037486924,0.00033891335,0.0003918911,0.00016029205,0.00026853447,0.00010670004,0.00013929332,0.00012758639,0.0000034334764],"category_scores_gemma":[0.0000336226,0.00030110497,0.00015524703,0.000080781414,0.000046157318,0.00012702186,0.0000016999619,0.00017500692,0.0000021046667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006670842,0.00005986791,0.0000016772048,0.0006777244,0.000049799077,7.082615e-7,0.00069042767,0.99519646,0.00044240602,0.00038078037,0.00016795381,0.002265457],"study_design_scores_gemma":[0.0005111979,0.0002844676,6.373169e-7,0.00034863007,0.000061400075,0.00006217514,0.00009957259,0.99566555,0.0014211482,0.00013339186,0.0010620281,0.00034978616],"about_ca_topic_score_codex":0.0000052356504,"about_ca_topic_score_gemma":0.000003993004,"teacher_disagreement_score":0.9616301,"about_ca_system_score_codex":0.00007112372,"about_ca_system_score_gemma":0.00002096138,"threshold_uncertainty_score":0.9999441},"labels":[],"label_agreement":null},{"id":"W2151027979","doi":"10.1109/59.910787","title":"Z-bus loss allocation","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":405,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Exploit; Computer science; Mathematical optimization; Computation; Context (archaeology); Process (computing); Consistency (knowledge bases); Electric power system; Flow network; Power (physics); Bus network; Matrix (chemical analysis); Set (abstract data type); Algorithm; Mathematics; System bus","score_opus":0.00764439158587871,"score_gpt":0.19930127205171727,"score_spread":0.19165688046583856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151027979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071889414,0.00031346653,0.97412217,0.0000422729,0.0052395,0.000424012,0.000011025735,0.0009719146,0.011686701],"genre_scores_gemma":[0.9973081,0.00014687188,0.000108087435,0.00002302138,0.00002907926,0.00013653011,0.0000045984775,0.00007149881,0.0021722373],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986901,0.00005792653,0.0003942783,0.00023648418,0.0002929674,0.00032819502],"domain_scores_gemma":[0.99929845,0.000049177837,0.00004622292,0.00041225136,0.00008524173,0.0001086811],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016665261,0.00022475596,0.00022016974,0.0002712468,0.00010673057,0.00007932107,0.00016235754,0.00015953094,0.000091429436],"category_scores_gemma":[0.0000021497824,0.00023915984,0.00008105715,0.0006132719,0.000017276003,0.0002565463,2.7933075e-7,0.00019941192,0.0005355298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015307192,0.00006454436,0.000027254053,0.000052881547,0.000091159694,0.000017800208,0.00031248265,0.99578047,0.0013176376,0.00012814777,0.0015544579,0.0006378406],"study_design_scores_gemma":[0.0017198314,0.00035250024,0.00019275196,0.00037925394,0.00011839705,0.00089613855,0.0003344538,0.90991575,0.017873893,0.000020614827,0.06682145,0.0013749824],"about_ca_topic_score_codex":0.000050602088,"about_ca_topic_score_gemma":0.000015871032,"teacher_disagreement_score":0.99011916,"about_ca_system_score_codex":0.00026300226,"about_ca_system_score_gemma":0.000022379254,"threshold_uncertainty_score":0.9752655},"labels":[],"label_agreement":null},{"id":"W2151066229","doi":"10.1109/59.867139","title":"Generation scheduling and the switching curve law","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Lagrangian relaxation; Scheduling (production processes); Mathematical optimization; Computer science; Dual (grammatical number); Electric power system; Power (physics); Law; Mathematics; Mathematical economics; Political science; Physics","score_opus":0.010756387473722682,"score_gpt":0.20234949841345587,"score_spread":0.1915931109397332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151066229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021671023,0.0009024367,0.96598506,0.00006098675,0.0018735067,0.00047228206,0.000005976739,0.00036838534,0.008660348],"genre_scores_gemma":[0.99892676,0.00014881538,0.00021925225,0.000056527097,0.000045474004,0.00010114804,0.0000017847987,0.000044963344,0.0004552577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892974,0.00012548424,0.0003364201,0.00019411146,0.00019979778,0.00021445108],"domain_scores_gemma":[0.9995197,0.000086022905,0.000031860694,0.0002712093,0.000032782267,0.000058436854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036572426,0.00017923274,0.00020614486,0.00007876745,0.00028054178,0.0001817084,0.00009870153,0.00010228623,0.000058141548],"category_scores_gemma":[0.0000015819826,0.00014171838,0.000059435202,0.00022490387,0.000030936222,0.00025167226,2.6970113e-7,0.00023513589,0.00007778199],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017424221,0.00001245714,0.0000011137937,0.000027361437,0.00006695376,0.0000013533861,0.000788816,0.9956557,0.0009886164,0.0013344061,0.000078696394,0.0010271145],"study_design_scores_gemma":[0.0008374605,0.000028724624,0.0000024421179,0.00006673767,0.000034472607,0.00006308024,0.000069560556,0.99432147,0.0022162732,0.000011045671,0.002152096,0.00019662463],"about_ca_topic_score_codex":0.00017814641,"about_ca_topic_score_gemma":0.000045709592,"teacher_disagreement_score":0.97725576,"about_ca_system_score_codex":0.0000788365,"about_ca_system_score_gemma":0.000009895411,"threshold_uncertainty_score":0.57791084},"labels":[],"label_agreement":null},{"id":"W2151537799","doi":"10.1109/tpwrs.2006.881111","title":"Derivation of an Accurate Polynomial Representation of the Transient Stability Boundary","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"University of Manitoba","keywords":"Nonlinear system; Mathematics; Electric power system; Control theory (sociology); Polynomial; Transient (computer programming); Boundary (topology); Applied mathematics; Function (biology); Mathematical optimization; Linear system; Stability (learning theory); Transformation (genetics); Power (physics); Computer science; Mathematical analysis","score_opus":0.014567906835899544,"score_gpt":0.2262904355699901,"score_spread":0.21172252873409056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151537799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42906883,0.00003642161,0.5673622,0.000014571468,0.0017796902,0.00042036636,0.00011905393,0.000083303035,0.0011155478],"genre_scores_gemma":[0.99978596,0.0000025654451,0.00008721086,0.0000035440598,0.00000638939,0.000039229024,0.000007189353,0.00002122438,0.000046666024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983954,0.00021008396,0.00073260046,0.00019850025,0.00031557123,0.00014788842],"domain_scores_gemma":[0.99905145,0.00006228464,0.0001339515,0.0005731858,0.00013693873,0.000042179203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002612535,0.00014851832,0.0002689616,0.000091936876,0.00009183347,0.000030133586,0.00016109599,0.000100951496,0.000053937816],"category_scores_gemma":[0.0000044778803,0.00012452579,0.00014748906,0.00041199525,0.00008834986,0.00026679106,6.014373e-7,0.000117339936,0.0000021879107],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000710681,0.0002498357,0.00025559624,0.00019932822,0.000041966716,2.7239633e-7,0.001158867,0.96324617,0.03448997,0.000039686336,0.00014080491,0.00010641602],"study_design_scores_gemma":[0.001831054,0.00026458924,0.02907889,0.00018972527,0.00010369724,0.000018917886,0.0017389093,0.35997704,0.6046299,0.000024747911,0.0016025872,0.0005399583],"about_ca_topic_score_codex":0.00046259366,"about_ca_topic_score_gemma":0.00025677242,"teacher_disagreement_score":0.60326916,"about_ca_system_score_codex":0.00011462836,"about_ca_system_score_gemma":0.000048760787,"threshold_uncertainty_score":0.5078015},"labels":[],"label_agreement":null},{"id":"W2152032313","doi":"10.1109/tpwrs.2006.873131","title":"Investigating Distributed Generation Systems Performance Using Monte Carlo Simulation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":152,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Monte Carlo method; Randomness; Electric power system; Computer science; Distributed generation; Mathematical optimization; Power (physics); Control theory (sociology); Mathematics","score_opus":0.02229225268095488,"score_gpt":0.22427685040764878,"score_spread":0.2019845977266939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152032313","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45615983,0.00016249553,0.53978884,0.0000028599625,0.0028183167,0.00033479044,0.0002402719,0.0003902025,0.00010237825],"genre_scores_gemma":[0.99942476,0.0000050386057,0.00015207718,0.0000039682873,0.0001249617,0.000072167255,0.00007387195,0.000067382076,0.00007575755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982061,0.000076339944,0.0006462765,0.00030027903,0.0003845283,0.00038651898],"domain_scores_gemma":[0.99925226,0.00004562193,0.00010904337,0.00033152697,0.00016268519,0.000098846846],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002068472,0.00031477795,0.0002859076,0.00017250792,0.0003027441,0.0002250345,0.000112366026,0.00020602127,0.000007505324],"category_scores_gemma":[0.000003906172,0.00034909815,0.00009087571,0.00044024337,0.000036451136,0.0005628032,8.4795096e-7,0.00026325963,0.000047698362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038137402,0.00002984948,0.00009205651,0.00010739517,0.000033469,0.0000015900672,0.00005655425,0.9843909,0.014998313,0.00001775919,0.00022801955,0.00004025421],"study_design_scores_gemma":[0.00031982045,0.00005811914,0.00017665453,0.00015675739,0.00004486288,0.000018077879,0.000069413574,0.99267465,0.005567425,4.6503308e-7,0.00057066546,0.0003431082],"about_ca_topic_score_codex":0.0005030346,"about_ca_topic_score_gemma":0.00002271349,"teacher_disagreement_score":0.5432649,"about_ca_system_score_codex":0.0006459181,"about_ca_system_score_gemma":0.000030235671,"threshold_uncertainty_score":0.9998961},"labels":[],"label_agreement":null},{"id":"W2152585623","doi":"10.1109/tpwrs.2003.810676","title":"Reconciling social welfare, agent profits, and consumer payments in electricity pools","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Microeconomics; Economics; Revenue; Electricity; Profit (economics); Electricity market; Marginal cost; Marginal profit; Payment; Transfer payment; Schedule; Social Welfare; Welfare; Engineering; Market economy; Finance","score_opus":0.012374998286326709,"score_gpt":0.21533427865897367,"score_spread":0.20295928037264696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152585623","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.117937505,0.0014115847,0.8684786,0.00006131828,0.0038337135,0.0015212407,0.00003963264,0.0004930558,0.006223348],"genre_scores_gemma":[0.9992176,0.00008353153,0.00009277761,0.000017040295,0.0000070460005,0.00017964999,0.0000021310518,0.000053580334,0.0003466322],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983439,0.00018125835,0.0005075227,0.00030105095,0.000250036,0.00041627145],"domain_scores_gemma":[0.9995632,0.000050950963,0.00006357043,0.0001780883,0.000054840333,0.00008934967],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036790222,0.00025101422,0.00032950542,0.00032322583,0.00016274369,0.00007610758,0.00008295352,0.0001923096,0.000034595836],"category_scores_gemma":[0.000008005359,0.0002716921,0.00005824077,0.0005749927,0.000018168419,0.00018203977,4.1320578e-7,0.0003136844,0.0000259625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029069086,0.0014877933,0.007078299,0.0025751605,0.0020867009,0.0001984644,0.010782166,0.93334466,0.016456999,0.0066627623,0.00601786,0.01301846],"study_design_scores_gemma":[0.022993008,0.0017495446,0.0063850624,0.0018235494,0.00076543423,0.0013495074,0.0044299774,0.64709073,0.17341483,0.00014264614,0.13047458,0.00938111],"about_ca_topic_score_codex":0.00005186424,"about_ca_topic_score_gemma":0.000029802477,"teacher_disagreement_score":0.8812801,"about_ca_system_score_codex":0.00039161186,"about_ca_system_score_gemma":0.00003550115,"threshold_uncertainty_score":0.99997354},"labels":[],"label_agreement":null},{"id":"W2152717061","doi":"10.1109/tpwrs.2002.804955","title":"Combined pool/bilateral dispatch. II. Curtailment of firm and nonfirm contracts","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Bidding; Revenue; Microeconomics; Economic dispatch; Payment; Economics; Industrial organization; Business; Commodity; Power (physics); Electric power system; Finance","score_opus":0.007939023995683081,"score_gpt":0.18135859198546633,"score_spread":0.17341956798978325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152717061","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16429155,0.0010104257,0.82462806,0.000089809546,0.004478914,0.0010388946,0.00008328286,0.0005040128,0.0038750346],"genre_scores_gemma":[0.99846077,0.00013298701,0.00006949134,0.000014899372,0.000011207542,0.00008168021,0.0000028869401,0.000055322347,0.00117077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985713,0.000051900883,0.000543681,0.00023786594,0.00027919046,0.0003160969],"domain_scores_gemma":[0.9993021,0.000070087044,0.000090544265,0.00033454123,0.00007017897,0.0001325472],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013019798,0.00025775124,0.00039472926,0.00020789394,0.00011358639,0.000045735447,0.000119457356,0.00015171414,0.000117725234],"category_scores_gemma":[0.0000025770178,0.00025592014,0.00008193975,0.0002744087,0.0000331616,0.00020815757,0.0000010313818,0.00019380881,0.000031526215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011273045,0.0009996112,0.0004296625,0.0007784347,0.0008336633,0.00003738083,0.0056712157,0.97102267,0.011687449,0.00035609645,0.0063383263,0.0017327523],"study_design_scores_gemma":[0.0033924151,0.0011944035,0.0007075171,0.0006137956,0.00016326479,0.00011268729,0.00019210402,0.9699869,0.017422229,0.000006535284,0.005313771,0.0008943697],"about_ca_topic_score_codex":0.00008468256,"about_ca_topic_score_gemma":0.000011882994,"teacher_disagreement_score":0.8341692,"about_ca_system_score_codex":0.000116210824,"about_ca_system_score_gemma":0.000007513876,"threshold_uncertainty_score":0.99998933},"labels":[],"label_agreement":null},{"id":"W2152974989","doi":"10.1109/tpwrs.2002.1007890","title":"Development of a hybrid model for electrical power spot prices","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Actua; Western University","funders":"","keywords":"Spot contract; Electricity; Electricity market; Electricity price; Economics; Econometrics; Stochastic modelling; Electricity pricing; Forward contract; Electricity generation; Electric power system; Electric power; Forward price; Computer science; Microeconomics; Power (physics); Financial economics; Engineering; Electrical engineering; Finance","score_opus":0.01820611343287834,"score_gpt":0.20982148705083412,"score_spread":0.19161537361795578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152974989","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009020033,0.0004414047,0.98582566,0.000008859717,0.0012582345,0.0008350207,0.00003863891,0.00036792207,0.0022042554],"genre_scores_gemma":[0.99039036,0.000024227267,0.008161739,0.000009688045,0.000007753626,0.00032325482,0.000002734874,0.000077590725,0.0010026604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982383,0.000022758404,0.0007093915,0.0002772782,0.00034505365,0.000407201],"domain_scores_gemma":[0.9992669,0.00008525323,0.000101834565,0.00031438287,0.00012262427,0.00010896093],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002010644,0.00026669816,0.00037785206,0.00035803026,0.000110919886,0.000038837166,0.00019982038,0.00010504078,0.00004579972],"category_scores_gemma":[0.0000045584443,0.00027240854,0.0001309893,0.00040237026,0.000014611874,0.00017227205,5.745693e-7,0.00016393723,0.000051129093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002578547,0.00020050237,9.87979e-7,0.000146981,0.00019130029,0.0000020982854,0.0015590434,0.99054575,0.004552678,0.00014401569,0.0019707512,0.0006601262],"study_design_scores_gemma":[0.0004793157,0.00009284115,0.0000014210555,0.00007568748,0.00002915458,0.00002925778,0.00003218081,0.95822394,0.03775611,0.0000029718994,0.0029902547,0.00028688455],"about_ca_topic_score_codex":0.0000026339562,"about_ca_topic_score_gemma":0.0000028024638,"teacher_disagreement_score":0.98137033,"about_ca_system_score_codex":0.00026255802,"about_ca_system_score_gemma":0.000040664563,"threshold_uncertainty_score":0.9999728},"labels":[],"label_agreement":null},{"id":"W2153208593","doi":"10.1109/tpwrs.2005.846098","title":"Approximate Methods for Event-Based Customer Interruption Cost Evaluation","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Computer science; Event (particle physics); Electric utility; Duration (music); Customer base; Operations research; Engineering; Business","score_opus":0.04041944229119199,"score_gpt":0.34656751311562056,"score_spread":0.3061480708244286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153208593","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007164409,0.00033495243,0.9882624,0.00009313144,0.0063460926,0.0023280177,0.00007811185,0.0004600906,0.0013807245],"genre_scores_gemma":[0.99169594,0.000009673927,0.005323681,0.000052437623,0.00004129622,0.0023957032,0.000011214385,0.000059813683,0.00041024317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99827886,0.00023228176,0.0005483292,0.00031697753,0.0002658613,0.00035772292],"domain_scores_gemma":[0.9989823,0.00017534815,0.000077074634,0.00044559364,0.00021078873,0.00010888471],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017356451,0.00025409873,0.00031175857,0.00021584428,0.00011714541,0.00006896223,0.00016106649,0.00017657167,0.000081385646],"category_scores_gemma":[0.000015092992,0.00024565592,0.00021199409,0.00021624792,0.000031151867,0.00025348127,4.7138158e-7,0.00019341394,0.00016568169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056393572,0.000112229696,7.8354844e-7,0.00026831753,0.00007601709,1.8308003e-7,0.00031506253,0.96705234,0.0045642247,0.000092282986,0.0011231612,0.026338983],"study_design_scores_gemma":[0.0008959963,0.00007377773,0.0000041853614,0.00018805484,0.00007048573,0.000008261689,0.00012985572,0.8863936,0.019407963,0.000008053359,0.09256332,0.00025643787],"about_ca_topic_score_codex":0.000016746648,"about_ca_topic_score_gemma":0.000027610457,"teacher_disagreement_score":0.9909795,"about_ca_system_score_codex":0.00060687185,"about_ca_system_score_gemma":0.00004833371,"threshold_uncertainty_score":0.9999996},"labels":[],"label_agreement":null},{"id":"W2153268897","doi":"10.1109/tpwrs.2007.907375","title":"Hybrid Particle Swarm Optimization Approach for Solving the Discrete OPF Problem Considering the Valve Loading Effects","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":237,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Mathematical optimization; Particle swarm optimization; Sequential quadratic programming; Robustness (evolution); Electric power system; Quadratic programming; Computer science; Optimization problem; Mathematics; Power (physics)","score_opus":0.009270539254496592,"score_gpt":0.21157072149318967,"score_spread":0.2023001822386931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153268897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022694394,0.00060109614,0.9903466,0.000043947995,0.0022033637,0.0026581849,0.000012811079,0.0005615832,0.0013029897],"genre_scores_gemma":[0.991548,0.000022178396,0.0074395533,0.000036280708,0.000054727752,0.0006285587,0.000005590538,0.000109509,0.00015559551],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99802494,0.00010323884,0.000590214,0.00032945248,0.00033191976,0.0006202146],"domain_scores_gemma":[0.9983702,0.00080835127,0.00012305213,0.00049115793,0.00010455855,0.000102712904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001310811,0.00031118182,0.00028887088,0.00012209851,0.0005962793,0.00025153236,0.00027435023,0.000104179504,0.000004195135],"category_scores_gemma":[0.000020930227,0.00021817756,0.00020586603,0.00042278282,0.000050074705,0.00029720634,0.000002082037,0.0003044485,0.000007909851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001973696,0.000030022149,0.000006329832,0.00022902866,0.00018529949,0.0000017020163,0.0009923086,0.9965489,0.0014494784,0.00015572466,0.00019721703,0.00018425814],"study_design_scores_gemma":[0.00049954676,0.000081993625,0.000004155374,0.00013916357,0.000111180896,0.000074182724,0.00036055766,0.9492928,0.048945844,0.000006761797,0.00021134618,0.00027246666],"about_ca_topic_score_codex":0.00003213129,"about_ca_topic_score_gemma":0.0000059226095,"teacher_disagreement_score":0.98927855,"about_ca_system_score_codex":0.00025800357,"about_ca_system_score_gemma":0.000027901282,"threshold_uncertainty_score":0.88970226},"labels":[],"label_agreement":null},{"id":"W2153593905","doi":"10.1109/tpwrs.2003.818742","title":"Assessment of customer supply reliability in performance-based contracts","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Mains electricity; Quality (philosophy); Order (exchange); Computer science; Electricity; Service quality; Electricity market; Competition (biology); Risk analysis (engineering); Service provider; Electric power industry; Service (business); Business; Power (physics); Engineering; Marketing; Finance","score_opus":0.007546141501752266,"score_gpt":0.21751388225527146,"score_spread":0.2099677407535192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153593905","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4224208,0.00015110952,0.549207,0.000018881365,0.005014889,0.0009349169,0.00006834048,0.00021343592,0.021970656],"genre_scores_gemma":[0.9993605,0.000030750656,0.00020663737,0.000015972759,0.0000035608916,0.00018642966,0.0000011970227,0.000032984917,0.00016193732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815416,0.0001665592,0.0007073892,0.00027662757,0.00031993468,0.00037533767],"domain_scores_gemma":[0.99897736,0.00017082122,0.00007238274,0.0005721759,0.00010393156,0.00010332759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008666445,0.00023630592,0.00046227273,0.00022992313,0.000046180783,0.000021197213,0.0001492216,0.00016773661,0.000079535654],"category_scores_gemma":[0.000011102989,0.00022331189,0.00012986951,0.00037538362,0.000064236636,0.00018229577,3.2095946e-7,0.00035356535,0.000041347314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023932247,0.00034297685,0.0029406745,0.0006570465,0.00003543956,0.000004728068,0.00016737242,0.9932921,0.0020033233,0.0002884872,0.00015040148,0.00009354161],"study_design_scores_gemma":[0.010489059,0.0014404577,0.076302595,0.0043281815,0.00016682646,0.00009878174,0.0012763651,0.66318893,0.14694542,0.00003574174,0.09298497,0.00274265],"about_ca_topic_score_codex":0.00009666424,"about_ca_topic_score_gemma":0.000039926017,"teacher_disagreement_score":0.5769397,"about_ca_system_score_codex":0.00037102395,"about_ca_system_score_gemma":0.00011787299,"threshold_uncertainty_score":0.91063946},"labels":[],"label_agreement":null},{"id":"W2153618882","doi":"10.1109/tpwrs.2009.2039652","title":"Application of a Joint Deterministic-Probabilistic Criterion to Wind Integrated Bulk Power System Planning","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Electric power system; Wind power; Reliability engineering; Reliability (semiconductor); Mathematical optimization; Computer science; Engineering; Operations research; Power (physics); Mathematics; Electrical engineering; Artificial intelligence","score_opus":0.009722167966965418,"score_gpt":0.22009989360580268,"score_spread":0.21037772563883725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153618882","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1916489,0.000042918324,0.7980722,0.000017611872,0.0068112975,0.0010670408,0.00014098383,0.00051119586,0.0016878477],"genre_scores_gemma":[0.9991789,8.7524586e-7,0.00032372403,0.00001558405,0.000022897151,0.0002777472,0.000004336611,0.00006957345,0.00010638209],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99783957,0.00007326306,0.0009104285,0.00044133002,0.00033159892,0.00040380834],"domain_scores_gemma":[0.99843407,0.000115135124,0.00012616329,0.0008531335,0.00023896575,0.0002325245],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000499896,0.00035071556,0.0005640755,0.000313048,0.00011209669,0.000091480404,0.00028697742,0.00026341784,0.0000216327],"category_scores_gemma":[0.000027570399,0.0003294867,0.00015399099,0.00042125228,0.00006891046,0.00016584939,0.000002346467,0.00047125728,0.00015451355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015953257,0.0003316876,0.000049542803,0.0033720585,0.00022301683,0.000036696718,0.0051104543,0.5667027,0.4207554,0.0017261083,0.000638875,0.00089390227],"study_design_scores_gemma":[0.002559224,0.00175587,0.0018370815,0.0076088347,0.00034154838,0.0010746673,0.008028207,0.82693267,0.09664955,0.000052241594,0.049990483,0.003169614],"about_ca_topic_score_codex":0.00016627042,"about_ca_topic_score_gemma":0.000032826378,"teacher_disagreement_score":0.80753,"about_ca_system_score_codex":0.00023244975,"about_ca_system_score_gemma":0.000048321795,"threshold_uncertainty_score":0.9999157},"labels":[],"label_agreement":null},{"id":"W2153912041","doi":"10.1109/tpwrs.2009.2020212","title":"An Integrated Approach for Optimizing Dynamic Transfer Limits at Hydro-Quebec","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Electric power system; Process (computing); Transfer function; Transient (computer programming); Maximum power transfer theorem; Engineering; Limit (mathematics); Transfer (computing); Transmission system; Reliability engineering; Control engineering; Electric power transmission; Transmission (telecommunications); Stability (learning theory); Computer science; Power (physics); Electrical engineering; Mathematics","score_opus":0.011855224565439307,"score_gpt":0.22624768741354345,"score_spread":0.21439246284810415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153912041","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008316106,0.00016713796,0.98475564,0.000026939932,0.0018276001,0.0012695742,0.00022127593,0.0010910648,0.0023246661],"genre_scores_gemma":[0.995499,0.000016292339,0.0030346094,0.00003736491,0.000006993328,0.00023741828,0.000066215056,0.00007729637,0.0010247957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808186,0.00011487137,0.00060949987,0.00048015846,0.00025340074,0.0004602046],"domain_scores_gemma":[0.9989647,0.000056324814,0.000031480322,0.0006020816,0.00010778659,0.00023758692],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002946689,0.000397257,0.00047284755,0.00024236267,0.00023489009,0.00013909394,0.00025838436,0.0002754433,0.00005389617],"category_scores_gemma":[0.0000021264143,0.0003831822,0.00022853923,0.00032800972,0.00003320296,0.00036278195,2.291717e-7,0.00025185404,0.000022997354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008466879,0.00022892171,0.0000014331683,0.00010490912,0.000071482806,0.0000014553538,0.00097150163,0.9926317,0.005177485,0.00005148092,0.0001358673,0.0005391363],"study_design_scores_gemma":[0.0008621032,0.00022169651,0.000022214428,0.000062833366,0.00004682684,0.000027175513,0.00048083495,0.99136794,0.004159101,0.0000014407834,0.002277295,0.0004705545],"about_ca_topic_score_codex":0.00009971688,"about_ca_topic_score_gemma":0.00033148646,"teacher_disagreement_score":0.9871829,"about_ca_system_score_codex":0.0005793565,"about_ca_system_score_gemma":0.000039305374,"threshold_uncertainty_score":0.999862},"labels":[],"label_agreement":null},{"id":"W2153985974","doi":"10.1109/tpwrs.2012.2209462","title":"Accelerated Computation of Multiphase Short Circuit Summary for Unbalanced Distribution Systems Using the Concept of Selected Inversion","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Islanding Detection in Power Systems","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Thévenin's theorem; Computation; Inversion (geology); Modified nodal analysis; Computer science; Nodal analysis; Electrical impedance; Algorithm; Equivalent circuit; Control theory (sociology); Electronic engineering; Engineering; Electrical engineering; Voltage","score_opus":0.03564880816221642,"score_gpt":0.2614198994452788,"score_spread":0.22577109128306241,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153985974","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1284593,0.00052592735,0.85929716,0.0000016397267,0.009595941,0.0012709456,0.00056668784,0.00021876632,0.000063615706],"genre_scores_gemma":[0.99959767,0.000006674151,0.000037499765,0.0000017685857,0.000058999387,0.00012897125,0.000073197356,0.00005450366,0.000040702216],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981116,0.00017884006,0.00081671507,0.0001894594,0.0003473065,0.00035609814],"domain_scores_gemma":[0.9986675,0.00021959934,0.00021191832,0.00029023862,0.000525919,0.00008482351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042179364,0.00025378252,0.0004565994,0.0001895974,0.00018414436,0.00004017647,0.00015474738,0.00021509266,0.0000040283862],"category_scores_gemma":[0.000013293414,0.0002222841,0.00012437804,0.00086362055,0.000072123636,0.000279178,0.0000011254322,0.00019923123,0.000002984833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085622814,0.00012415652,0.00019578145,0.0005251894,0.00030824516,3.7750522e-7,0.0013992694,0.91924834,0.07693318,0.00007069726,0.0010062553,0.000102864295],"study_design_scores_gemma":[0.0011378397,0.00018312449,0.00010683061,0.00060407,0.00015442917,0.000039475763,0.0012192684,0.84058905,0.15497296,8.9232884e-7,0.0006620216,0.0003300499],"about_ca_topic_score_codex":0.00018721161,"about_ca_topic_score_gemma":0.0000035917867,"teacher_disagreement_score":0.8711384,"about_ca_system_score_codex":0.00035477392,"about_ca_system_score_gemma":0.000041538195,"threshold_uncertainty_score":0.90644825},"labels":[],"label_agreement":null},{"id":"W2154860395","doi":"10.1109/tpwrs.2009.2030282","title":"Supply Adequacy Assessment of Distribution System Including Wind-Based DG During Different Modes of Operation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Islanding; Reliability engineering; Wind power; Monte Carlo method; Distributed generation; Reliability (semiconductor); Electric power system; Computer science; Engineering; Power (physics); Renewable energy; Electrical engineering; Mathematics; Statistics","score_opus":0.010383875971778839,"score_gpt":0.23441464658531802,"score_spread":0.22403077061353918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154860395","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33336234,0.000107821914,0.6641965,0.00002139583,0.0010292805,0.00048346652,0.00022304276,0.00019128392,0.00038486486],"genre_scores_gemma":[0.9997632,0.000014483765,0.00007123634,0.0000028522486,0.000013251934,0.000053304706,0.000018486988,0.000024479403,0.000038692142],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99805087,0.00011931948,0.0008512344,0.0002589355,0.00043521097,0.00028445703],"domain_scores_gemma":[0.99911284,0.00006767699,0.00015190811,0.00044905316,0.00012983508,0.00008869535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003021384,0.0002662613,0.0005416639,0.00016387302,0.00011844789,0.00003875681,0.0001893272,0.00015058472,0.000008487349],"category_scores_gemma":[0.0000034314974,0.00024441627,0.00018357935,0.00021367782,0.000033269796,0.00021134247,0.0000010765705,0.00020576616,0.0000034504287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040313233,0.00020601602,0.00009902522,0.0016579491,0.000069137925,0.000002487378,0.00019409074,0.8956911,0.10082199,0.0011358134,0.000021746802,0.00006032254],"study_design_scores_gemma":[0.0013227819,0.00040069906,0.004633999,0.0030156623,0.000080885555,0.000018672441,0.00067109946,0.63709784,0.35229486,0.0000051597226,0.00006279074,0.00039553936],"about_ca_topic_score_codex":0.000045800833,"about_ca_topic_score_gemma":0.000007946763,"teacher_disagreement_score":0.66640085,"about_ca_system_score_codex":0.00063978136,"about_ca_system_score_gemma":0.00004320213,"threshold_uncertainty_score":0.99670064},"labels":[],"label_agreement":null},{"id":"W2155990195","doi":"10.1109/tpwrs.2009.2021210","title":"Instantaneous Relaxation-Based Real-Time Transient Stability Simulation","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transient (computer programming); Real-time simulation; Computer science; Stability (learning theory); Electric power system; Nonlinear system; Time domain; Relaxation (psychology); Power system simulation; Control theory (sociology); Set (abstract data type); Control engineering; Simulation; Power (physics); Engineering; Control (management)","score_opus":0.009989837641700553,"score_gpt":0.21826343268857587,"score_spread":0.20827359504687531,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2155990195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.085695855,0.000061884304,0.8931656,0.000067036926,0.0015630127,0.0010842104,0.000072472256,0.0013197393,0.016970217],"genre_scores_gemma":[0.9994348,0.000008068713,0.000053973,0.000039140054,0.00002565853,0.00005340158,0.000013125709,0.000050260656,0.0003215559],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978712,0.00016570682,0.00076015695,0.0003569279,0.00049499614,0.00035096757],"domain_scores_gemma":[0.9987615,0.00025466585,0.00009803949,0.00056337746,0.00014291402,0.00017954127],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031113345,0.00032762942,0.0004107221,0.00023889651,0.0001726574,0.00013121884,0.00014208865,0.00021893404,0.00027113588],"category_scores_gemma":[0.000005607434,0.00032916205,0.00020473529,0.00038681854,0.000025448506,0.00025828162,1.4001455e-7,0.00022247847,0.00030731552],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000094159186,0.00011941085,0.0000038720955,0.000039078423,0.00003993246,0.000007243827,0.00038890197,0.9850116,0.013012411,0.000029370194,0.00007073473,0.0011833296],"study_design_scores_gemma":[0.0010129269,0.00023582696,0.00024516726,0.00008665665,0.000036307738,0.000008171606,0.000093943825,0.9941879,0.0019646492,0.0000076155957,0.0017685058,0.0003523251],"about_ca_topic_score_codex":0.0000678303,"about_ca_topic_score_gemma":0.000014677903,"teacher_disagreement_score":0.91373897,"about_ca_system_score_codex":0.0003667494,"about_ca_system_score_gemma":0.000048945243,"threshold_uncertainty_score":0.999916},"labels":[],"label_agreement":null},{"id":"W2156474867","doi":"10.1109/tpwrs.2009.2023266","title":"Oligopolistic Competition of Gencos in Reactive Power Ancillary Service Provisions","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Oligopoly; Electric power system; Procurement; Market power; Electricity market; Operator (biology); Incentive; Industrial organization; Business; Economics; Microeconomics; Computer science; Power (physics); Engineering; Cournot competition; Electricity; Electrical engineering; Monopoly; Voltage","score_opus":0.007386658032236702,"score_gpt":0.2075960731468953,"score_spread":0.2002094151146586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156474867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048174776,0.00029522838,0.9349664,0.000074095995,0.0018485779,0.0010154439,0.000098478115,0.0003989778,0.013128057],"genre_scores_gemma":[0.9994901,0.000035490622,0.00021734706,0.00005190633,0.000011888395,0.000060660277,0.0000083897985,0.000042117088,0.000082118044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99829715,0.0001023654,0.00064525596,0.00027014394,0.0003468354,0.00033822918],"domain_scores_gemma":[0.9990957,0.0000909697,0.00010565997,0.00042852518,0.00017887825,0.00010030668],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020649564,0.0002598239,0.0004165673,0.0005201066,0.000060508435,0.000031080413,0.00018197381,0.00019473584,0.000036424783],"category_scores_gemma":[0.000005237452,0.000278441,0.00008271767,0.0010514024,0.000016574353,0.00027793553,5.7037516e-7,0.00029131095,0.000059488786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006728729,0.00038747521,0.000024711402,0.00022339406,0.00007285335,0.000019724108,0.0020284504,0.97795707,0.017798636,0.0008054281,0.00038656124,0.0002283843],"study_design_scores_gemma":[0.006214995,0.002702495,0.0065908264,0.004486554,0.00028076573,0.00053602987,0.0034012177,0.88900274,0.07768114,0.00027396154,0.005656071,0.0031732267],"about_ca_topic_score_codex":0.00016337918,"about_ca_topic_score_gemma":0.00007127316,"teacher_disagreement_score":0.9513153,"about_ca_system_score_codex":0.0003856991,"about_ca_system_score_gemma":0.000061091014,"threshold_uncertainty_score":0.9999668},"labels":[],"label_agreement":null},{"id":"W2156950876","doi":"10.1109/tpwrs.2003.810895","title":"Multiobjective optimal power flows to evaluate voltage security costs in power networks","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":154,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Calgary","funders":"","keywords":"Activity-based costing; AC power; Electric power system; Power-flow study; Mathematical optimization; Voltage; Reliability engineering; Interior point method; Voltage optimisation; Computer science; Linear programming; Power (physics); Operating point; Power flow; Power budget; Multi-objective optimization; Electricity generation; Engineering; Power factor; Electronic engineering; Electrical engineering; Mathematics","score_opus":0.007110715249246217,"score_gpt":0.2293703040456204,"score_spread":0.22225958879637417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156950876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23630951,0.00025304046,0.7488411,0.000014219604,0.006916347,0.0012954266,0.00023308258,0.00045152032,0.005685717],"genre_scores_gemma":[0.9990803,0.000014147587,0.00020701384,0.000048389615,0.00001674221,0.00035116915,0.000011960291,0.00012091287,0.00014935977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99694854,0.00023443626,0.00073517003,0.00064924255,0.00053426845,0.00089831493],"domain_scores_gemma":[0.9985853,0.00012695737,0.00006344284,0.00066634186,0.00020175331,0.0003562476],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007341161,0.0005669361,0.0005576643,0.00043498707,0.00015052331,0.00014559008,0.00025705245,0.000391547,0.00034963712],"category_scores_gemma":[0.000027253154,0.0006283798,0.00022086057,0.00095588685,0.00003464815,0.00040862648,0.000002489564,0.00083231943,0.00057680265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010195916,0.00024848315,0.00003880572,0.000023219252,0.000114084,0.000034993474,0.0010756713,0.99558955,0.0014884335,0.0001240546,0.0010894056,0.00007136407],"study_design_scores_gemma":[0.004766283,0.0013643153,0.0011475128,0.0006663747,0.00013451357,0.00015515585,0.002712764,0.9562151,0.010010658,0.000015287911,0.020161934,0.0026500898],"about_ca_topic_score_codex":0.00012087354,"about_ca_topic_score_gemma":0.00022198014,"teacher_disagreement_score":0.7627708,"about_ca_system_score_codex":0.0013714099,"about_ca_system_score_gemma":0.000059331163,"threshold_uncertainty_score":0.99961674},"labels":[],"label_agreement":null},{"id":"W2157212792","doi":"10.1109/tpwrs.2003.810897","title":"Multiobjective optimization for pricing system security in electricity markets","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":179,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Bidding; Electric power system; Electricity market; Computer science; Mathematical optimization; Electricity; Transmission system; Database transaction; Transmission (telecommunications); Reliability engineering; Power (physics); Economics; Engineering; Microeconomics; Electrical engineering; Mathematics; Telecommunications","score_opus":0.005668262670152979,"score_gpt":0.20348869527997057,"score_spread":0.1978204326098176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157212792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027460033,0.00014243143,0.96502197,0.0000034711804,0.002657413,0.0013481242,0.00014468067,0.00047782372,0.0027440283],"genre_scores_gemma":[0.9987243,0.000010931858,0.00075115863,0.0000042352112,0.000009587989,0.00039927065,0.000010201464,0.00005432474,0.000036029953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985103,0.00013421613,0.0004470976,0.00030776692,0.00019833374,0.00040229142],"domain_scores_gemma":[0.99936104,0.00013569758,0.000058906953,0.00024088574,0.0001215289,0.00008196809],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004474446,0.0002503729,0.00030182264,0.00029495318,0.00012005513,0.000062156454,0.00009197038,0.00019809918,0.000014737137],"category_scores_gemma":[0.000017671286,0.0002834724,0.00010924376,0.00057286775,0.0000142514255,0.0002515374,3.0034983e-7,0.00025767175,0.000017749207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051888353,0.00009134984,0.000017335875,0.0002559917,0.00004791114,0.0000026959663,0.00027591025,0.99836713,0.00045321646,0.00027615664,0.00010990067,0.000050509443],"study_design_scores_gemma":[0.0010259912,0.00011216231,0.000054087708,0.00017928655,0.000029671664,0.000025113353,0.00048322353,0.9853224,0.012063174,0.0000043910654,0.0003778502,0.00032264844],"about_ca_topic_score_codex":0.00004405201,"about_ca_topic_score_gemma":0.00002108106,"teacher_disagreement_score":0.97126424,"about_ca_system_score_codex":0.001121258,"about_ca_system_score_gemma":0.00003512867,"threshold_uncertainty_score":0.99996173},"labels":[],"label_agreement":null},{"id":"W2157496029","doi":"10.1109/59.910791","title":"Wide-area measurement based stabilizing control of large power systems-a decentralized/hierarchical approach","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":596,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Phasor; Electric power system; Control theory (sociology); Phasor measurement unit; Control engineering; Control system; Computer science; Reliability (semiconductor); Transmission system; Automatic Generation Control; Engineering; Transmission (telecommunications); Power (physics); Control (management); Telecommunications","score_opus":0.02146627558416366,"score_gpt":0.21939896058845665,"score_spread":0.19793268500429298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157496029","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040962948,0.0011513245,0.982309,0.000036672693,0.0038465997,0.0016368222,0.000292157,0.000587243,0.0060438793],"genre_scores_gemma":[0.99921894,0.000028396364,0.00022358386,0.00004085178,0.0000040735886,0.0002948486,0.000008164705,0.000093652605,0.00008751083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9957559,0.0005087255,0.0012881197,0.00053345,0.0011680546,0.0007457416],"domain_scores_gemma":[0.99793905,0.00021480088,0.00016426346,0.0009141113,0.00042321841,0.00034458036],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00153941,0.0004926436,0.00090254704,0.0003498557,0.00018393343,0.00012364084,0.00033015435,0.00028877342,0.00022875518],"category_scores_gemma":[0.000032698114,0.00046655518,0.00034366833,0.0005863128,0.00007417868,0.00022527517,0.0000015002828,0.00041086448,0.00003214475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020202543,0.00074864127,0.0007808764,0.0006289898,0.0003259762,0.000009174041,0.00060566555,0.9949598,0.0009684321,0.00030535966,0.00045282373,0.000012264946],"study_design_scores_gemma":[0.004613438,0.00023201734,0.00030546854,0.00050150667,0.00013834256,0.000048514634,0.0011924481,0.969731,0.00094066514,0.0000024649257,0.021497007,0.00079717784],"about_ca_topic_score_codex":0.00006472676,"about_ca_topic_score_gemma":0.00002671092,"teacher_disagreement_score":0.9951226,"about_ca_system_score_codex":0.00050352426,"about_ca_system_score_gemma":0.00011789789,"threshold_uncertainty_score":0.9997786},"labels":[],"label_agreement":null},{"id":"W2157717363","doi":"10.1109/59.867155","title":"Cost related reliability measures for power system equipment","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Markov chain; Component (thermodynamics); Electric power system; Markov model; Computer science; Markov process; Reliability theory; Mathematical optimization; Power (physics); Operations research; Engineering; Failure rate; Mathematics; Statistics","score_opus":0.01456962781671844,"score_gpt":0.22217478816886446,"score_spread":0.20760516035214602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157717363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01614848,0.00066738494,0.9363819,0.000091007096,0.012373258,0.0036406072,0.00041808022,0.0021026605,0.028176617],"genre_scores_gemma":[0.99378085,0.000041696538,0.00011368416,0.000025777917,0.000018588298,0.0012627032,0.0000053952417,0.00010361363,0.004647682],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99701846,0.00015981359,0.001030532,0.00060217205,0.00047700937,0.00071199826],"domain_scores_gemma":[0.998255,0.0001998043,0.000075472206,0.0010240447,0.00018339026,0.00026225668],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0010192244,0.00045651954,0.00063392706,0.00015203611,0.00025946565,0.00010680393,0.00034209204,0.0003559147,0.00028808528],"category_scores_gemma":[0.000010328503,0.0004242933,0.00037077317,0.00033307087,0.00008068038,0.00025268443,8.8462696e-7,0.00037064755,0.00080483267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003809276,0.00041716924,0.000013331581,0.0017907264,0.0005278342,0.00002067587,0.0021603121,0.97786194,0.0012562993,0.0007947651,0.012176068,0.0025999765],"study_design_scores_gemma":[0.004674664,0.0010196451,0.00013749003,0.0027275265,0.00027942832,0.0003576398,0.0026132562,0.13581966,0.009829671,0.000067235436,0.8401404,0.0023333712],"about_ca_topic_score_codex":0.00008657126,"about_ca_topic_score_gemma":0.000018206614,"teacher_disagreement_score":0.9776324,"about_ca_system_score_codex":0.0008648722,"about_ca_system_score_gemma":0.000052741725,"threshold_uncertainty_score":0.9999732},"labels":[],"label_agreement":null},{"id":"W2158598170","doi":"10.1109/tpwrs.2005.851931","title":"One-Year Deferral Method for Estimating Avoided Transmission and Distribution Costs","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro","funders":"","keywords":"Deferral; Planner; Reliability engineering; Reduction (mathematics); Electric power system; Transmission (telecommunications); Computer science; Mathematical optimization; Control theory (sociology); Engineering; Power (physics); Mathematics; Economics; Control (management); Telecommunications","score_opus":0.013195480532484226,"score_gpt":0.2513885772609969,"score_spread":0.23819309672851266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2158598170","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010192838,0.00026717075,0.9953199,0.00008293259,0.0012821774,0.00092586124,0.00011719323,0.00052789104,0.00045756972],"genre_scores_gemma":[0.9164064,0.000022635963,0.083049215,0.000012494658,0.000042900087,0.00021477733,0.000026407019,0.00006279183,0.00016236622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985989,0.000093676914,0.00046150942,0.00028807632,0.00022156526,0.00033627707],"domain_scores_gemma":[0.99932534,0.00017443336,0.000062119456,0.00021491924,0.000081865874,0.00014130394],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003938196,0.00023067922,0.00030198495,0.00013675018,0.00020080266,0.00009671013,0.000093558556,0.00018832258,0.000014044484],"category_scores_gemma":[0.000007916777,0.00025395042,0.00009302563,0.0002474733,0.000016734744,0.00027492788,4.1972842e-7,0.00020480424,0.000018815537],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057877474,0.000073279734,0.0000027323993,0.00026265415,0.000109493965,4.686744e-7,0.00048823658,0.9677593,0.0048719635,0.00026710602,0.0007426224,0.02536428],"study_design_scores_gemma":[0.00086242263,0.00011741246,0.000011365722,0.00023385907,0.00006783002,0.000023612261,0.00006479749,0.9839897,0.011262582,0.000008522917,0.0030751508,0.00028270995],"about_ca_topic_score_codex":0.000030234014,"about_ca_topic_score_gemma":0.000008888001,"teacher_disagreement_score":0.91538715,"about_ca_system_score_codex":0.0003706798,"about_ca_system_score_gemma":0.000021836297,"threshold_uncertainty_score":0.9999913},"labels":[],"label_agreement":null},{"id":"W2159040640","doi":"10.1109/tpwrs.2009.2030380","title":"Economic Impact of Electricity Market Price Forecasting Errors: A Demand-Side Analysis","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Calgary","funders":"","keywords":"Electricity market; Electricity; Electricity price; Economics; Economic forecasting; Electricity price forecasting; Econometrics; Electricity generation; Engineering; Power (physics)","score_opus":0.011092739019856595,"score_gpt":0.22513237465419295,"score_spread":0.21403963563433634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159040640","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39464474,0.00022653781,0.58923906,0.0000040540667,0.00062022125,0.00015643991,0.00006559021,0.00023390238,0.014809487],"genre_scores_gemma":[0.99949217,0.000027976139,0.00015277315,0.0000071267887,0.000024541368,0.00001448096,0.0000034606728,0.000032273234,0.00024520291],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99852276,0.00006322564,0.0005817358,0.00025348293,0.00016015246,0.00041863674],"domain_scores_gemma":[0.9991879,0.00014409801,0.00013012828,0.00033246176,0.00004089948,0.00016450627],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031339464,0.0002852633,0.0005278328,0.0006277649,0.00009691928,0.000049052265,0.00017343265,0.00013842905,0.0001736582],"category_scores_gemma":[0.000005892631,0.00027015057,0.0005333526,0.0007908292,0.000016565107,0.00020721473,4.9809483e-7,0.00024032037,0.000012574755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034383003,0.00003464769,0.00016850908,0.000029748022,0.00090256875,0.0000051002316,0.00025022932,0.9965337,0.0011713665,0.000013120811,0.00024277133,0.0006138409],"study_design_scores_gemma":[0.00036252727,0.00032680325,0.0016096605,0.000115582174,0.00034642618,0.000049414746,0.00004636484,0.99120337,0.0053931447,0.000011093397,0.00016099407,0.00037463146],"about_ca_topic_score_codex":0.00035985623,"about_ca_topic_score_gemma":0.00009942777,"teacher_disagreement_score":0.60484743,"about_ca_system_score_codex":0.00042303168,"about_ca_system_score_gemma":0.000060872717,"threshold_uncertainty_score":0.9999751},"labels":[],"label_agreement":null},{"id":"W2159285614","doi":"10.1109/59.910793","title":"Simulation of the start-up of a Hydro Power plant for the emergency power supply of a nuclear power station","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Magnetic confinement fusion research","field":"Physics and Astronomy","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada); University of British Columbia","funders":"","keywords":"Exciter; Engineering; Nuclear power plant; Emtp; Power station; Power (physics); Nuclear power; Electrical engineering; Electricity generation; Electric power system; Rotor (electric); Turbine; Automotive engineering; Mechanical engineering; Physics","score_opus":0.016913658184550134,"score_gpt":0.26346090867745703,"score_spread":0.2465472504929069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159285614","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5540393,0.00009496551,0.4219824,0.0007255292,0.0031614166,0.0037371244,0.0020229165,0.000028534068,0.014207779],"genre_scores_gemma":[0.99699295,0.000007210701,0.000016606366,0.0000099232475,0.000009026635,0.00008501497,0.000007673256,0.000024491059,0.002847114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981323,0.00012113565,0.00071614893,0.00021733266,0.00057246716,0.00024064459],"domain_scores_gemma":[0.9983035,0.0003618216,0.00035543996,0.00056831,0.00035838396,0.000052555257],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00034631873,0.00017406835,0.00027166388,0.0001337851,0.00015601626,0.000017371003,0.0002963166,0.000058003072,0.03346629],"category_scores_gemma":[0.00000821662,0.00011643136,0.00027973423,0.0003406417,0.00008011863,0.0000500129,0.000004757378,0.00015303472,0.000010321778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0076215337,0.009401005,0.008668881,0.001104511,0.004217366,0.0000041733006,0.057847954,0.6020669,0.20681904,0.0276065,0.054334313,0.020307824],"study_design_scores_gemma":[0.013462651,0.006395633,0.020117078,0.0012038068,0.0008698022,0.0000076135616,0.054387406,0.34210706,0.030992562,0.00041675562,0.5282864,0.0017532454],"about_ca_topic_score_codex":0.00096049905,"about_ca_topic_score_gemma":0.000054910943,"teacher_disagreement_score":0.47395205,"about_ca_system_score_codex":0.000014293845,"about_ca_system_score_gemma":0.00007757851,"threshold_uncertainty_score":0.96741724},"labels":[],"label_agreement":null},{"id":"W2159530637","doi":"10.1109/tpwrs.2003.820709","title":"Coordination in Markets With Nonconvexities as a Mathematical Program With Equilibrium Constraints—Part II: Case Studies","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Lagrange multiplier; Economic dispatch; Multiplier (economics); Electric power system; Power system simulation; Electricity market; Computer science; Market clearing; Marginal cost; Electricity; Mathematics; Economics; Power (physics)","score_opus":0.01130599141994049,"score_gpt":0.24032288325947163,"score_spread":0.22901689183953114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159530637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33604795,0.00032726183,0.6514772,0.00013929076,0.001120626,0.0026244235,0.000028769467,0.0011404469,0.0070940307],"genre_scores_gemma":[0.9973025,0.000010289762,0.0010551307,0.00001100985,0.000013021993,0.00092943053,0.0000027536034,0.00007934695,0.0005965503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826974,0.00007935085,0.0005278363,0.00032329836,0.00037469398,0.0004250626],"domain_scores_gemma":[0.99920696,0.00011503728,0.00008372466,0.0003199344,0.00016366526,0.000110698726],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002920283,0.00035510515,0.00047698332,0.00036229848,0.00012563753,0.00009275172,0.000100695535,0.0001405315,0.000034190984],"category_scores_gemma":[0.0000075188354,0.00029033085,0.000052188814,0.0006628155,0.00017644785,0.00036067027,0.0000011965254,0.0002835529,0.000041390733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028953076,0.00091333,0.000038045695,0.0011948156,0.0009668647,0.0029819321,0.008588358,0.9821776,0.00019671708,0.0015568819,0.0002481827,0.0008477299],"study_design_scores_gemma":[0.04379834,0.024987582,0.00009617905,0.026857732,0.0015868881,0.19845255,0.074020624,0.5747067,0.041618608,0.00061869295,0.003931529,0.009324623],"about_ca_topic_score_codex":0.000052221414,"about_ca_topic_score_gemma":0.00013494842,"teacher_disagreement_score":0.6612545,"about_ca_system_score_codex":0.0004976248,"about_ca_system_score_gemma":0.00010693497,"threshold_uncertainty_score":0.9999549},"labels":[],"label_agreement":null},{"id":"W2159833660","doi":"10.1109/tpwrs.2010.2052116","title":"Classification of Future Electricity Market Prices","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Electricity market; Electricity; Electricity price forecasting; Economics; Context (archaeology); Computer science; Scheduling (production processes); Econometrics; Term (time); Market price; Operations research; Microeconomics; Engineering; Operations management","score_opus":0.007764022047784758,"score_gpt":0.20196486271535166,"score_spread":0.1942008406675669,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159833660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3874176,0.00022229794,0.5656009,0.000027163895,0.011574709,0.00020873541,0.000045666722,0.0004213827,0.034481585],"genre_scores_gemma":[0.9992288,0.000032776898,0.0001694766,0.000004821358,0.000067436755,0.000028692313,0.0000016603663,0.000028768762,0.00043759728],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992206,0.000020530562,0.00027177017,0.00013853253,0.00017009626,0.00017844682],"domain_scores_gemma":[0.9995084,0.00006014892,0.00005717659,0.00026038723,0.000052038424,0.00006187051],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015494828,0.00013929143,0.00016510021,0.00015557765,0.000066308356,0.000025971343,0.00012900887,0.00016059629,0.00013153983],"category_scores_gemma":[0.000001885612,0.00013094555,0.00007624724,0.00029449177,0.000020405349,0.00011772282,2.2845921e-7,0.0003519438,0.000017063028],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011490607,0.0004361019,0.0005679975,0.00079737435,0.0004685189,0.00000813552,0.0020516873,0.16025785,0.8065298,0.0042672222,0.009174691,0.01532569],"study_design_scores_gemma":[0.0013392812,0.0003785763,0.009235962,0.0003441181,0.00015695298,0.00014904149,0.000866885,0.4921536,0.28958493,0.000038771937,0.20431118,0.0014406914],"about_ca_topic_score_codex":0.000025188772,"about_ca_topic_score_gemma":0.000058267957,"teacher_disagreement_score":0.61181116,"about_ca_system_score_codex":0.000024874862,"about_ca_system_score_gemma":0.000014778024,"threshold_uncertainty_score":0.5339805},"labels":[],"label_agreement":null},{"id":"W2160807713","doi":"10.1109/tpwrs.2003.810998","title":"Competitive framework for procurement of interruptible load services","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Electric power system; Computer science; Service (business); Load management; Reliability engineering; Electricity market; Operations research; Load factor; Electricity; Power (physics); Business; Engineering; Electrical engineering","score_opus":0.010731505783665524,"score_gpt":0.2308834690714656,"score_spread":0.22015196328780007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160807713","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008564577,0.00042663768,0.9861016,0.000007396286,0.0032221114,0.0009840856,0.000053719214,0.00022589749,0.008122048],"genre_scores_gemma":[0.9959429,0.000024579114,0.0034135976,0.000013196817,0.000008694887,0.00029148484,0.0000021262003,0.00005254031,0.00025089367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987832,0.00005352017,0.00043582005,0.00020210138,0.00027270184,0.00025266336],"domain_scores_gemma":[0.9992434,0.000114003466,0.00009057049,0.00028059215,0.00020757843,0.00006385676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023453163,0.00019927829,0.00029634265,0.00015829719,0.00005948853,0.00003596466,0.00013408033,0.00014256961,0.00003979519],"category_scores_gemma":[0.0000050131453,0.0002028487,0.0001029598,0.00032244733,0.000015053514,0.00012786115,2.8257864e-7,0.00014645199,0.000025230122],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000086920285,0.00035881958,0.000027580234,0.0027082274,0.0006703296,0.0000024016651,0.0045116222,0.94281816,0.0046495153,0.043622795,0.00035620524,0.00018740857],"study_design_scores_gemma":[0.005292612,0.0030014932,0.000034368935,0.007287198,0.00051488855,0.00017107163,0.0080060195,0.28320184,0.5972204,0.00076133246,0.0918138,0.0026949714],"about_ca_topic_score_codex":0.000019074028,"about_ca_topic_score_gemma":0.00001670317,"teacher_disagreement_score":0.99508643,"about_ca_system_score_codex":0.00024125612,"about_ca_system_score_gemma":0.000043728327,"threshold_uncertainty_score":0.827193},"labels":[],"label_agreement":null},{"id":"W2161873733","doi":"10.1109/tpwrs.2010.2042084","title":"SIMD-Based Large-Scale Transient Stability Simulation on the Graphics Processing Unit","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":107,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"SIMD; Graphics processing unit; Computer science; Transient (computer programming); Graphics; Computation; Parallel computing; Computational science; General-purpose computing on graphics processing units; Software; Stability (learning theory); Central processing unit; CUDA; Computer hardware; Computer graphics (images); Algorithm; Operating system","score_opus":0.019853825807725017,"score_gpt":0.23722718817530375,"score_spread":0.21737336236757873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161873733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.087622285,0.000026897376,0.90474766,0.00011614774,0.0029235687,0.000875931,0.00015296624,0.00058989105,0.002944651],"genre_scores_gemma":[0.9995674,0.0000015518042,0.00006691128,0.000098117904,0.000010378542,0.00013846043,0.000006549721,0.000055539487,0.00005510536],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99807733,0.00019319827,0.00053880806,0.00035247693,0.0004742214,0.00036398356],"domain_scores_gemma":[0.9985018,0.00033468017,0.000069685164,0.0007497238,0.00019771681,0.00014639393],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008380229,0.00030119813,0.00027643528,0.00016802672,0.00040584404,0.00014565559,0.00022496353,0.0002281379,0.0002193689],"category_scores_gemma":[0.000012999922,0.00023445742,0.000173295,0.0005751659,0.00007908989,0.00017422179,4.976511e-7,0.00068416947,0.000043327127],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003775191,0.00024302781,0.00005816299,0.00014486817,0.000022499376,5.6468105e-7,0.0012143793,0.99715686,0.0008909169,0.00009628995,0.00005536564,0.00007933632],"study_design_scores_gemma":[0.00046215876,0.000086927,0.0002141299,0.000071956696,0.00002422518,0.0000017143109,0.00046136914,0.9861698,0.003610528,0.000004986138,0.008618412,0.00027380532],"about_ca_topic_score_codex":0.000019212126,"about_ca_topic_score_gemma":0.00032511927,"teacher_disagreement_score":0.9119451,"about_ca_system_score_codex":0.000079418794,"about_ca_system_score_gemma":0.000060700957,"threshold_uncertainty_score":0.95608956},"labels":[],"label_agreement":null},{"id":"W2161877694","doi":"10.1109/tpwrs.2009.2038059","title":"Online Monitoring of Voltage Stability Margin Using an Artificial Neural Network","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":277,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Phasor; Margin (machine learning); Voltage; Artificial neural network; Control theory (sociology); Electric power system; Generator (circuit theory); Units of measurement; Engineering; Stability (learning theory); AC power; Power (physics); Computer science; Control (management); Artificial intelligence; Electrical engineering; Machine learning","score_opus":0.0357732314883415,"score_gpt":0.25822037007606097,"score_spread":0.22244713858771947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161877694","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50000244,0.000029036803,0.49070215,0.000002450892,0.008594469,0.00024583214,0.00010450394,0.00021351175,0.00010562582],"genre_scores_gemma":[0.9989183,0.000002242137,0.00090413063,0.0000027472165,0.00007556369,0.000019460678,0.0000048164234,0.000052262236,0.000020481255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99821424,0.000112058486,0.00071995216,0.0003005165,0.00029655398,0.00035669372],"domain_scores_gemma":[0.99883735,0.00007816913,0.00008939932,0.0006774529,0.00013742835,0.00018021338],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046306968,0.0002519249,0.00039173575,0.000115521725,0.00013961739,0.00006370925,0.00019923605,0.00019779967,0.0001264338],"category_scores_gemma":[0.0000066393677,0.0002605071,0.00013252624,0.00035770622,0.0000646731,0.00029615144,0.0000012042054,0.0004724791,0.000006270837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027048318,0.00028556178,0.0009371422,0.00010824822,0.000036507954,0.0000019322977,0.00048734955,0.9557893,0.042154036,0.000027137983,0.0000078806015,0.00013781698],"study_design_scores_gemma":[0.00028132522,0.00009913567,0.0011512407,0.000073568284,0.00003767282,0.000018094497,0.0008397467,0.9742185,0.022610532,0.000007764781,0.0002784377,0.0003839724],"about_ca_topic_score_codex":0.00013716661,"about_ca_topic_score_gemma":0.00021538329,"teacher_disagreement_score":0.49891588,"about_ca_system_score_codex":0.00008984419,"about_ca_system_score_gemma":0.00003529814,"threshold_uncertainty_score":0.99998474},"labels":[],"label_agreement":null},{"id":"W2162144622","doi":"10.1109/tpwrs.2014.2340881","title":"A Dynamic Water-Filling Method for Real-Time HVAC Load Control Based on Model Predictive Control","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"HVAC; Demand response; Model predictive control; Computer science; Control theory (sociology); Load regulation; Air conditioning; Process (computing); Renewable energy; Load management; Work (physics); Power (physics); Control engineering; Control (management); Engineering; Electricity; Artificial intelligence","score_opus":0.005185330047122007,"score_gpt":0.2092291637268083,"score_spread":0.2040438336796863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162144622","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00062954944,0.000013997552,0.9901998,0.000097701886,0.002686305,0.0013636849,0.00029013396,0.00089383486,0.00382498],"genre_scores_gemma":[0.9944372,0.000004557702,0.0030563965,0.0001088187,0.00003861756,0.0012998482,0.000011019295,0.0001404129,0.00090308173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979315,0.00016545717,0.00048867357,0.000455091,0.00040993266,0.00054938113],"domain_scores_gemma":[0.9986275,0.00043845497,0.000055852455,0.00060618995,0.00012382887,0.00014816306],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00081971806,0.0003992495,0.0005470997,0.00027502773,0.00016161885,0.0000717848,0.00021902849,0.00018149638,0.00002617271],"category_scores_gemma":[0.0000070583164,0.00034714388,0.0002580718,0.00011039188,0.000021221342,0.0001238283,6.061326e-7,0.00021538374,0.00010353217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028865368,0.0000827952,4.4216603e-7,0.00010902866,0.00031799058,0.0000014344096,0.00013250175,0.98719114,0.01134395,0.00005874932,0.00035738698,0.00011593822],"study_design_scores_gemma":[0.0036722105,0.00037640225,0.0000029839266,0.00012475764,0.00020822207,0.0000021084147,0.00002843276,0.9905846,0.0035602993,0.000024277546,0.0010536133,0.00036210354],"about_ca_topic_score_codex":0.000071149814,"about_ca_topic_score_gemma":0.000016044603,"teacher_disagreement_score":0.9938077,"about_ca_system_score_codex":0.00053368794,"about_ca_system_score_gemma":0.000026005522,"threshold_uncertainty_score":0.9998981},"labels":[],"label_agreement":null},{"id":"W2162230409","doi":"10.1109/tpwrs.2013.2296696","title":"Introducing Dynamic Demand Response in the LFC Model","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":177,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Toronto; Montana State University","keywords":"Demand response; Electric power system; Dynamic demand; Automatic frequency control; Control theory (sociology); Controller (irrigation); Computer science; Control engineering; Stability (learning theory); Power demand; Control (management); Power (physics); Grid; Load regulation; Automatic Generation Control; Power control; Engineering; Telecommunications; Electricity; Voltage; Electrical engineering","score_opus":0.006557968031031862,"score_gpt":0.20950350811026305,"score_spread":0.20294554007923118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162230409","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03883069,0.00045204963,0.95205003,0.00019916343,0.00474496,0.00059500686,0.000022058573,0.00034398554,0.0027620709],"genre_scores_gemma":[0.9989278,0.000012730003,0.00015045321,0.00007460328,0.000029021745,0.00027876443,9.3199816e-7,0.000073610674,0.0004521166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99767005,0.0005684776,0.00059306115,0.0003471282,0.0003783771,0.0004428767],"domain_scores_gemma":[0.99841136,0.00047663576,0.000052756914,0.0009400878,0.00004493887,0.00007420337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002055084,0.0002997485,0.0003661685,0.0003504434,0.00012313224,0.00012713393,0.00044072446,0.00017092079,0.000011228947],"category_scores_gemma":[0.000022552165,0.00024319498,0.00012011136,0.00037725616,0.000042686614,0.00020640154,6.592892e-7,0.0004960288,0.00014619541],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008900167,0.00003571793,0.000003093932,0.000059498205,0.00003798793,0.000006195073,0.0020399203,0.99102896,0.0059356983,0.0001826078,0.00047755952,0.0001037527],"study_design_scores_gemma":[0.00058317493,0.00011348209,0.000048687565,0.00014111873,0.000021037298,0.000059640428,0.00030943286,0.99606746,0.00032543595,0.000046054945,0.0020066414,0.00027783864],"about_ca_topic_score_codex":0.00007366707,"about_ca_topic_score_gemma":0.0001154878,"teacher_disagreement_score":0.9600971,"about_ca_system_score_codex":0.00028188902,"about_ca_system_score_gemma":0.00003003966,"threshold_uncertainty_score":0.9917204},"labels":[],"label_agreement":null},{"id":"W2162673969","doi":"10.1109/59.867185","title":"Impact of load management on composite system reliability evaluation short-term operating benefits","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Probabilistic logic; Load management; Electric power system; Computer science; Term (time); Operating cost; Operations research; Engineering; Power (physics)","score_opus":0.013673095999470735,"score_gpt":0.24900084234993464,"score_spread":0.2353277463504639,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162673969","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86537343,0.00034153802,0.103507586,0.0000073166266,0.002814979,0.0020275733,0.00020425639,0.00050657446,0.025216745],"genre_scores_gemma":[0.9992699,0.00004390031,0.000058989797,0.00000436508,0.000017461833,0.0002986671,0.0000059532813,0.000052036372,0.00024872622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972093,0.00021842068,0.0008813942,0.00046835368,0.0008197195,0.00040280895],"domain_scores_gemma":[0.99858344,0.000083846724,0.00006475962,0.00088636955,0.00023914511,0.00014241823],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010618792,0.00037391603,0.00052791886,0.00015635653,0.00014968484,0.00007240868,0.0002569023,0.00016793887,0.0001369536],"category_scores_gemma":[0.0000028522259,0.00032993683,0.00031746578,0.0003225297,0.00004102639,0.00021390413,0.0000012123452,0.00025873707,0.00016614175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000077292185,0.000193802,0.00011962309,0.000711166,0.00023418064,0.0000044127564,0.00043235207,0.9930789,0.00090165547,0.00007847982,0.00011972572,0.00404842],"study_design_scores_gemma":[0.0032158694,0.0017330848,0.020775309,0.008192716,0.0005307063,0.00015655856,0.0007850616,0.95198345,0.010204322,0.0000058307764,0.0007588518,0.0016582658],"about_ca_topic_score_codex":0.0001965421,"about_ca_topic_score_gemma":0.00001618656,"teacher_disagreement_score":0.13389647,"about_ca_system_score_codex":0.0016629113,"about_ca_system_score_gemma":0.00004704734,"threshold_uncertainty_score":0.99991524},"labels":[],"label_agreement":null},{"id":"W2162884667","doi":"10.1109/tpwrs.2005.846171","title":"Optimal Power Flow With Complementarity Constraints","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power Systems and Control","field":"Engineering","cited_by":107,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Power flow; Complementarity (molecular biology); Mixed complementarity problem; Mathematical optimization; Complementarity theory; Electric power system; Maximum flow problem; Operating point; Maximum power principle; Computer science; Control theory (sociology); Mathematics; Power (physics); Engineering; Voltage; Electronic engineering; Electrical engineering; Nonlinear system; Physics","score_opus":0.006627572279855933,"score_gpt":0.19478504792192036,"score_spread":0.18815747564206442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162884667","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018882882,0.00037454875,0.96512467,0.00007776435,0.0021371252,0.00061783084,0.00015915168,0.00058231945,0.012043735],"genre_scores_gemma":[0.9983659,0.000007971413,0.0006599024,0.00007431689,0.000039338847,0.00014165977,0.0000033460065,0.00006305867,0.0006445546],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983078,0.000052380623,0.0004443963,0.0003015996,0.0003720355,0.0005217919],"domain_scores_gemma":[0.9992281,0.000053622767,0.000049944854,0.0004112737,0.00006906928,0.00018798308],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015221599,0.00033242066,0.00038835304,0.00016629936,0.00015517688,0.00010513007,0.00019443547,0.000119771976,0.00057291146],"category_scores_gemma":[6.186135e-7,0.00029342266,0.00011718192,0.00023163276,0.00006528577,0.00021518167,5.4652713e-7,0.00036137569,0.00030027522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011337939,0.0003053316,0.00003794733,0.000080915124,0.00087868667,0.000047019555,0.0013331224,0.98166406,0.0025726145,0.0003300249,0.007629517,0.0050073666],"study_design_scores_gemma":[0.010704398,0.002231378,0.000439129,0.00072366465,0.0003632628,0.0014015741,0.0022745943,0.6136371,0.017596144,0.0000042251067,0.34738672,0.0032378356],"about_ca_topic_score_codex":0.00008467421,"about_ca_topic_score_gemma":0.00015951258,"teacher_disagreement_score":0.97948295,"about_ca_system_score_codex":0.00023181198,"about_ca_system_score_gemma":0.000045657984,"threshold_uncertainty_score":0.9999518},"labels":[],"label_agreement":null},{"id":"W2163900208","doi":"10.1109/tpwrs.2008.926423","title":"A Voltage-Behind-Reactance Induction Machine Model for the EMTP-Type Solution","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Purdue University","keywords":"Emtp; Reactance; Stator; Transient (computer programming); Engineering; Control theory (sociology); Computer science; Rotor (electric); Electric power system; Voltage; Control engineering; Electronic engineering; Power (physics); Electrical engineering","score_opus":0.02711504672276461,"score_gpt":0.2287124600396714,"score_spread":0.2015974133169068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163900208","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006478375,0.000670184,0.9852012,0.000070320944,0.0050574224,0.0010480852,0.00005286914,0.00047117186,0.0009503869],"genre_scores_gemma":[0.9953286,0.00008429144,0.000056894096,0.000031068845,0.000075848075,0.0002918919,0.00000670237,0.000063752406,0.00406097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871427,0.0000379955,0.00042670668,0.00023881759,0.00029035215,0.00029185874],"domain_scores_gemma":[0.9991669,0.000117858915,0.000075275166,0.00042591264,0.00013160973,0.00008241769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022801977,0.00023933742,0.00026278387,0.00013177044,0.0004250947,0.0000617018,0.00015680422,0.00016297789,0.000021828846],"category_scores_gemma":[0.0000046874493,0.0001903832,0.00016014067,0.00019931271,0.000035613015,0.0002964258,4.7012944e-7,0.00024762418,0.000085798434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066631335,0.00003981321,0.0000046430746,0.000036659072,0.00010496985,0.000001011852,0.00084442063,0.98951197,0.0074031083,0.00005526368,0.0012837753,0.0006477586],"study_design_scores_gemma":[0.0006979521,0.000059834412,0.000043409986,0.00003710718,0.000040491894,0.000052024643,0.00007924162,0.9915141,0.000604894,0.000008604657,0.0066539138,0.00020843705],"about_ca_topic_score_codex":0.00015874325,"about_ca_topic_score_gemma":0.00007228403,"teacher_disagreement_score":0.98885024,"about_ca_system_score_codex":0.00015907353,"about_ca_system_score_gemma":0.000032953314,"threshold_uncertainty_score":0.77636015},"labels":[],"label_agreement":null},{"id":"W2164543178","doi":"10.1109/tpwrs.2002.800957","title":"Stochastic evaluation of turbine-generator shaft torsional torques in a HVAC/DC power system","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Torque; Turbine; Control theory (sociology); Engineering; Steam turbine; Generator (circuit theory); Power (physics); Context (archaeology); Monte Carlo method; Automotive engineering; Computer science; Mechanical engineering; Mathematics; Physics","score_opus":0.019272370444886423,"score_gpt":0.2226356769088527,"score_spread":0.20336330646396628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164543178","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3725587,0.0037338275,0.5985436,0.00004546622,0.015292505,0.002065937,0.00028803348,0.00062835467,0.006843574],"genre_scores_gemma":[0.99921227,0.000009836549,0.000035079545,0.000008850384,0.000029375098,0.00034239216,0.000002473967,0.000053711632,0.00030602803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972669,0.00024718168,0.0008649053,0.00037649614,0.0008510829,0.00039343486],"domain_scores_gemma":[0.9988156,0.00011809555,0.000081331316,0.0005619119,0.00028779253,0.00013527933],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00096368924,0.0003219589,0.00052438845,0.00035545364,0.00006835641,0.000041255546,0.00023201545,0.0002274869,0.00023721941],"category_scores_gemma":[0.000018506682,0.0003088115,0.00017343905,0.00043582366,0.000044907298,0.00024888775,0.0000015294033,0.000273768,0.00015483175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042751366,0.00029903348,0.000022855556,0.0006435861,0.00015343919,0.000009087151,0.0021853822,0.9869079,0.00743138,0.00035833873,0.001794305,0.00015191661],"study_design_scores_gemma":[0.0020745727,0.00031014284,0.00019854965,0.0021092957,0.00013229183,0.000105526844,0.0014697334,0.9831223,0.008251834,0.000010521775,0.0014794217,0.0007358396],"about_ca_topic_score_codex":0.00012505862,"about_ca_topic_score_gemma":0.000061330335,"teacher_disagreement_score":0.62665355,"about_ca_system_score_codex":0.0007801866,"about_ca_system_score_gemma":0.0000453418,"threshold_uncertainty_score":0.9999364},"labels":[],"label_agreement":null},{"id":"W2164686774","doi":"10.1109/tpwrs.2014.2360363","title":"Linear Current Flow Equations With Application to Distribution Systems Reconfiguration","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Mathematical optimization; Control reconfiguration; Integer programming; Linear programming; Mathematics; Flow (mathematics); Minification; Linear equation; Integer (computer science); Current (fluid); Computer science; Engineering","score_opus":0.008555136052334902,"score_gpt":0.21926496544005358,"score_spread":0.21070982938771868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164686774","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003374611,0.00008420754,0.9891553,0.00006717838,0.0040679,0.0013095442,0.00072389515,0.00066380564,0.0005535707],"genre_scores_gemma":[0.99825364,0.000010656648,0.00018810175,0.000008914285,0.000087511486,0.0008993462,0.00041277672,0.000059714115,0.00007932885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99821573,0.00009726188,0.0005230646,0.00039512932,0.00040910864,0.00035970655],"domain_scores_gemma":[0.99880654,0.00009527468,0.000082822946,0.00054887176,0.00024927783,0.00021720506],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031430414,0.00031291464,0.00029010166,0.0001679132,0.00021870967,0.00014424784,0.0001626072,0.00014726899,0.000012166266],"category_scores_gemma":[0.000011331967,0.0003055683,0.00007760332,0.00056549377,0.000025319647,0.0003032866,7.49189e-7,0.00028804954,0.00074047054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031779065,0.00008229491,0.0000047075464,0.00010120448,0.00004013221,2.861401e-7,0.0001049233,0.99366605,0.0014890329,0.0007491949,0.0010015465,0.0027288704],"study_design_scores_gemma":[0.00039316437,0.00029501645,0.00005830699,0.00019771588,0.000054451193,0.00001194904,0.00007747948,0.9542549,0.0026278575,0.0000039271686,0.04162656,0.00039862326],"about_ca_topic_score_codex":0.00005049893,"about_ca_topic_score_gemma":0.000020813353,"teacher_disagreement_score":0.99487907,"about_ca_system_score_codex":0.0004847225,"about_ca_system_score_gemma":0.000030127558,"threshold_uncertainty_score":0.9999396},"labels":[],"label_agreement":null},{"id":"W2164735154","doi":"10.1109/tpwrs.2009.2021225","title":"Fuzzy Partitioning of a Real Power System for Dynamic Vulnerability Assessment","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":135,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University; Hydro-Québec","funders":"","keywords":"Medoid; Electric power system; Computer science; Context (archaeology); Cluster analysis; Fuzzy logic; Vulnerability (computing); Grid; Data mining; Fuzzy clustering; Real-time computing; Power (physics); Machine learning; Artificial intelligence; Mathematics; Geography","score_opus":0.01076424841988341,"score_gpt":0.26033780925865324,"score_spread":0.24957356083876983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164735154","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018839184,0.000078818615,0.96029615,0.00004203656,0.0036250092,0.001147201,0.0002887825,0.0006520579,0.015030751],"genre_scores_gemma":[0.99884045,0.000009170803,0.00070552225,0.000010110793,0.0000050186986,0.00024418597,0.000010323314,0.000037764443,0.00013743626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790543,0.00015059035,0.0008991263,0.000356779,0.00033537584,0.00035267393],"domain_scores_gemma":[0.9987654,0.00013837496,0.00012748608,0.00061447883,0.00021103011,0.00014322167],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006709518,0.00028193468,0.00053917087,0.00017915768,0.00017050648,0.00006579318,0.00017062524,0.00017996167,0.000029145816],"category_scores_gemma":[0.0000051173583,0.00028142607,0.00025117432,0.00029358876,0.00003712862,0.0001994665,5.541851e-7,0.00020142723,0.000011471257],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008843258,0.0003659446,0.000080382546,0.00086442154,0.00017498103,0.000002718267,0.00089893176,0.9907453,0.0033540374,0.0028811328,0.00033075266,0.00021297895],"study_design_scores_gemma":[0.0039731986,0.0017740497,0.004950429,0.0012817739,0.00023511049,0.000080635655,0.0040502036,0.9721922,0.0074186022,0.00013521886,0.0023196994,0.0015888686],"about_ca_topic_score_codex":0.000034976998,"about_ca_topic_score_gemma":0.000025270276,"teacher_disagreement_score":0.9800013,"about_ca_system_score_codex":0.0005697494,"about_ca_system_score_gemma":0.00006001582,"threshold_uncertainty_score":0.9999638},"labels":[],"label_agreement":null},{"id":"W2164802766","doi":"10.1109/tpwrs.2004.831699","title":"Optimal Investment Planning for Distributed Generation in a Competitive Electricity Market","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":528,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electricity market; Investment (military); Sizing; Electricity; Distributed generation; Capacity planning; Heuristic; Compensation (psychology); Operations research; Computer science; Mathematical optimization; Business; Microeconomics; Economics; Engineering; Operations management","score_opus":0.012919199215162259,"score_gpt":0.22189822387450853,"score_spread":0.20897902465934626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164802766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017011546,0.00022942181,0.9783341,0.000024803454,0.0014019166,0.0012109324,0.00015602575,0.00030057752,0.0013306221],"genre_scores_gemma":[0.9977992,0.000014067325,0.0013358338,0.000029856352,0.000026218728,0.0005972115,0.00005792647,0.000050885854,0.000088782384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998596,0.000067010726,0.00046704483,0.00027982265,0.00021115421,0.00037893918],"domain_scores_gemma":[0.99950266,0.000071440976,0.000062651154,0.00020063254,0.00007654571,0.0000860783],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025203015,0.0002422314,0.00028933678,0.00033277046,0.000105500236,0.000074498006,0.00010755344,0.00015294933,0.000010916014],"category_scores_gemma":[0.000006714275,0.00026806007,0.00007924815,0.0005644544,0.0000139336635,0.0001988978,4.3276918e-7,0.0002059964,0.000010251328],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003709841,0.000087775785,0.0000066321722,0.000053533204,0.00006224262,0.0000061830565,0.000408848,0.99668723,0.0016061959,0.0003840239,0.00064155954,0.000018699444],"study_design_scores_gemma":[0.0021168662,0.00032800608,0.000068565365,0.0002068531,0.000032855478,0.000038628426,0.00018615674,0.9730916,0.021965882,0.000010623508,0.0015325927,0.00042139122],"about_ca_topic_score_codex":0.000054572887,"about_ca_topic_score_gemma":0.000033081255,"teacher_disagreement_score":0.9807877,"about_ca_system_score_codex":0.0009840784,"about_ca_system_score_gemma":0.00005967565,"threshold_uncertainty_score":0.9999772},"labels":[],"label_agreement":null},{"id":"W2165320540","doi":"10.1109/tpwrs.2009.2038060","title":"Coordination of Investor-Owned DG Capacity Growth in Distribution Systems","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schematic; Investment (military); Distributed generation; Distribution (mathematics); Function (biology); Selection (genetic algorithm); Industrial organization; Unit (ring theory); Business; Computer science; Microeconomics; Operations research; Risk analysis (engineering); Economics; Engineering; Renewable energy; Electrical engineering; Mathematics","score_opus":0.00773446605784893,"score_gpt":0.18666072654525565,"score_spread":0.1789262604874067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165320540","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18403897,0.0000861003,0.80590296,0.000018358149,0.0075384947,0.0007431578,0.00014608326,0.00032623392,0.0011996253],"genre_scores_gemma":[0.9994835,0.000012748537,0.00006193544,0.0000028676152,0.000020392652,0.00018651517,0.000023867811,0.000051458952,0.00015667864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981073,0.00013770752,0.00076744764,0.00027476912,0.00038443363,0.00032831464],"domain_scores_gemma":[0.99902993,0.000107886386,0.0001514238,0.0003768134,0.00022531471,0.00010863089],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00052281626,0.00026508467,0.0004177071,0.0004140165,0.000072527524,0.000059776674,0.00019600826,0.00032623965,0.000012246967],"category_scores_gemma":[0.00002237168,0.00028163427,0.00008939014,0.00091389817,0.000048584327,0.00036049695,7.059433e-7,0.00049508194,0.00003119769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000541895,0.00041897813,0.0012113698,0.0012517138,0.00020321271,0.000008865059,0.0013844015,0.89822537,0.08839221,0.0067488533,0.001966901,0.00013393085],"study_design_scores_gemma":[0.001995894,0.00029201483,0.0014066357,0.00059800304,0.00007884032,0.0001237958,0.0003124687,0.9183314,0.07417145,0.000033872813,0.0017103399,0.00094528595],"about_ca_topic_score_codex":0.00090134575,"about_ca_topic_score_gemma":0.00016728029,"teacher_disagreement_score":0.8154446,"about_ca_system_score_codex":0.000346563,"about_ca_system_score_gemma":0.000042340813,"threshold_uncertainty_score":0.9999636},"labels":[],"label_agreement":null},{"id":"W2165788516","doi":"10.1109/tpwrs.2010.2068568","title":"Robust Optimal Power Flow Solution Using Trust Region and Interior-Point Methods","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Interior point method; Mathematical optimization; Power flow; Trust region; Convergence (economics); Nonlinear system; Point (geometry); Electric power system; Norm (philosophy); Dual (grammatical number); Nonlinear programming; Local convergence; Computer science; Mathematics; Power (physics); Control theory (sociology); Iterative method","score_opus":0.024773619970276363,"score_gpt":0.25898303709982157,"score_spread":0.2342094171295452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165788516","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.124967426,0.0001282489,0.8644709,0.00003772645,0.008895554,0.0003797689,0.000067916575,0.00047215252,0.000580322],"genre_scores_gemma":[0.9653816,0.000016077533,0.034321483,0.000012751309,0.000034000048,0.0000447926,0.000006921483,0.000082966864,0.00009938867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99831176,0.00010959655,0.0004957751,0.00041279275,0.0002169273,0.00045314338],"domain_scores_gemma":[0.99907833,0.00006163462,0.00007302607,0.00048096277,0.000103792525,0.0002022462],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045055526,0.000368504,0.00036546294,0.00026151005,0.00022314425,0.00018010379,0.00015551387,0.00034748964,0.00009713771],"category_scores_gemma":[0.000010445041,0.00038968367,0.00014919971,0.00027701733,0.00010440041,0.0005149189,0.0000030513459,0.0007223203,0.00004298588],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010592136,0.00010133735,0.000016970982,0.00014116552,0.00019052063,0.000024114537,0.0008948875,0.77104926,0.2242776,0.00010214968,0.00086366077,0.002232443],"study_design_scores_gemma":[0.00053940935,0.00018214394,0.0000685215,0.0001341007,0.000080429796,0.0004789661,0.0003219158,0.9761546,0.018594122,0.0000041887038,0.00293106,0.00051051815],"about_ca_topic_score_codex":0.000070425696,"about_ca_topic_score_gemma":0.0000197852,"teacher_disagreement_score":0.84041417,"about_ca_system_score_codex":0.00023690624,"about_ca_system_score_gemma":0.000027723665,"threshold_uncertainty_score":0.9998555},"labels":[],"label_agreement":null},{"id":"W2166053940","doi":"10.1109/tpwrs.2010.2058871","title":"On the Educational Aspects of Potential Functions for the System Analysis and Control","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Transient (computer programming); Control engineering; Computer science; Representation (politics); Electric power system; Stability (learning theory); Robotics; Function (biology); Robot; Artificial intelligence; Control (management); Industrial engineering; Power (physics); Systems engineering; Engineering; Machine learning","score_opus":0.00489938653798291,"score_gpt":0.19523472283816667,"score_spread":0.19033533630018376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166053940","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009968181,0.00006419382,0.9812999,0.00034657988,0.005300611,0.00081530254,0.00034263683,0.00009259162,0.0017700046],"genre_scores_gemma":[0.9992945,0.0000022847269,0.000026911557,0.00001741327,0.000019006266,0.00035732405,0.0000030720764,0.000018272389,0.00026118362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905556,0.000072508694,0.00034442495,0.00017346897,0.00020820653,0.00014584519],"domain_scores_gemma":[0.9984369,0.0008346956,0.000070559465,0.00045698977,0.00014094757,0.000059883663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004140064,0.00014493335,0.00023880835,0.0001617252,0.00031927778,0.00006865057,0.00014030948,0.00008687984,0.000110563706],"category_scores_gemma":[0.00001354246,0.000089506975,0.00020505341,0.00036277395,0.00006659522,0.00005557804,4.027662e-7,0.00019729955,0.000012208378],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006189762,0.00011637353,0.00004981323,0.00015100715,0.0016750059,2.4091185e-7,0.0003709404,0.9741772,0.0024094016,0.020272939,0.0006686785,0.000046516354],"study_design_scores_gemma":[0.00077483465,0.00009824521,0.0013616435,0.000042988653,0.0009586944,0.000022798358,0.0012115529,0.99299484,0.0010667326,0.000031435375,0.0012088459,0.00022738083],"about_ca_topic_score_codex":0.000060888175,"about_ca_topic_score_gemma":0.00015461989,"teacher_disagreement_score":0.98932636,"about_ca_system_score_codex":0.000044065662,"about_ca_system_score_gemma":0.00003524549,"threshold_uncertainty_score":0.36499885},"labels":[],"label_agreement":null},{"id":"W2166154009","doi":"10.1109/tpwrs.2008.926401","title":"Determination of Network Rental Components in a Competitive Electricity Market","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Renting; Tracing; Electricity market; Revenue; Mathematical optimization; Constraint (computer-aided design); Electricity; Electric power transmission; Economic surplus; Economics; Computer science; Engineering; Mathematics; Finance","score_opus":0.011740085809468925,"score_gpt":0.19659923373462854,"score_spread":0.18485914792515962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166154009","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05309804,0.00019699485,0.9353546,0.0000035646692,0.0018162468,0.00055638264,0.000025165984,0.00018758944,0.008761412],"genre_scores_gemma":[0.99919766,0.00008342761,0.00035244037,0.0000051907527,0.000012240821,0.00006995347,0.0000052228734,0.000037515354,0.00023635778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998525,0.00015313325,0.00053808733,0.00019524478,0.00029019907,0.00029828318],"domain_scores_gemma":[0.9994474,0.00012260921,0.00009360998,0.00021005432,0.00006881373,0.000057533274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020637478,0.00019119745,0.00034143837,0.00034084645,0.000072394374,0.000011420385,0.00012617369,0.00012836193,0.000034459474],"category_scores_gemma":[0.0000030797096,0.00021635073,0.00007779329,0.0007765415,0.00002940277,0.00016279207,5.81914e-7,0.00021852991,0.00001682163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016467429,0.00041595637,0.0012530629,0.00023538386,0.000119043005,0.00005552273,0.0012722708,0.9899032,0.0048458935,0.0001182027,0.0012560186,0.00036074652],"study_design_scores_gemma":[0.0013132591,0.0002558127,0.0045862747,0.00044829276,0.000025644229,0.00022452734,0.0000740712,0.9835387,0.008596817,0.0000055398295,0.00049540866,0.00043563818],"about_ca_topic_score_codex":0.000095887386,"about_ca_topic_score_gemma":0.00003852978,"teacher_disagreement_score":0.94609964,"about_ca_system_score_codex":0.00031040484,"about_ca_system_score_gemma":0.000023604833,"threshold_uncertainty_score":0.8822527},"labels":[],"label_agreement":null},{"id":"W2166418605","doi":"10.1109/tpwrs.2007.901741","title":"Generation and Transmission Expansion Under Risk Using Stochastic Programming","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":154,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Mathematical optimization; Probabilistic logic; Stochastic programming; Linear programming; Nonlinear programming; Variance (accounting); Transmission (telecommunications); Node (physics); Computer science; Expected value; Stochastic process; Random variable; Stochastic optimization; Nonlinear system; Mathematics; Engineering; Statistics; Telecommunications; Artificial intelligence; Economics","score_opus":0.02205254868347343,"score_gpt":0.24096117456514077,"score_spread":0.21890862588166735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166418605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1846426,0.0006441717,0.8113676,0.000006528867,0.0024926693,0.00047576,0.000010600713,0.0002848201,0.00007530551],"genre_scores_gemma":[0.99870294,0.000033175384,0.0010720736,0.000007825051,0.00003395148,0.000027644477,0.0000014510856,0.00004711183,0.000073813455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986137,0.0000615742,0.00042925563,0.00029186078,0.0002446797,0.0003588886],"domain_scores_gemma":[0.99939805,0.00007574561,0.000054878536,0.00025082193,0.000056450677,0.0001640341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059442985,0.00022983181,0.00023533136,0.00017855917,0.0002396957,0.00007374609,0.000069758935,0.0001792635,0.000008550324],"category_scores_gemma":[0.0000027744545,0.00021334532,0.00007697903,0.0002117402,0.000041022573,0.00020903982,5.179573e-7,0.0002653632,0.000011047093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000315206,0.00006475004,0.000005039633,0.00015266404,0.000056843575,0.000006357376,0.0010551944,0.9536453,0.035825342,0.000045630608,0.000031530417,0.009079854],"study_design_scores_gemma":[0.0008662006,0.000208182,0.00009941167,0.00058820465,0.00011332688,0.00020406254,0.0011690477,0.9773012,0.016321212,0.000016480753,0.0024928565,0.00061984727],"about_ca_topic_score_codex":0.00013719837,"about_ca_topic_score_gemma":0.00004376502,"teacher_disagreement_score":0.81406033,"about_ca_system_score_codex":0.00017685443,"about_ca_system_score_gemma":0.00001910177,"threshold_uncertainty_score":0.86999696},"labels":[],"label_agreement":null},{"id":"W2166464259","doi":"10.1109/tpwrs.2010.2048345","title":"Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment","year":2010,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Power system simulation; Wind power; Mathematical optimization; Probabilistic logic; Electric power system; Probability density function; Schedule; Residual; Economic dispatch; Reliability engineering; Computer science; Operations research; Power (physics); Engineering; Mathematics; Algorithm; Electrical engineering; Statistics","score_opus":0.018030964606955666,"score_gpt":0.27825378883674995,"score_spread":0.26022282422979426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166464259","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10363448,0.00010387491,0.8880982,0.000018657787,0.0044545867,0.0006404617,0.000047168716,0.00022663544,0.0027759399],"genre_scores_gemma":[0.99917823,0.000003641034,0.00027452083,0.000011111203,0.000035273282,0.000031480235,0.0000031735847,0.0000855784,0.00037699362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832237,0.000093716575,0.0005768406,0.00024056196,0.00038334256,0.00038319972],"domain_scores_gemma":[0.99864674,0.0002548042,0.00014526221,0.0007149927,0.000104856066,0.00013336973],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025834754,0.00032240598,0.00038081838,0.0001713341,0.00015650556,0.00021594514,0.00032323925,0.0001385087,0.00013763676],"category_scores_gemma":[0.0000121636795,0.0002489112,0.00021261559,0.00041443366,0.00006023471,0.0003983898,0.0000015432763,0.00053971255,0.000075973636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020921036,0.00013648163,0.000041040177,0.00006547271,0.0004248912,0.000013921196,0.0016505434,0.98640794,0.009337876,0.000106729654,0.0014588576,0.00033535712],"study_design_scores_gemma":[0.0060301824,0.002832971,0.0047085243,0.0017938971,0.0010808541,0.0023432164,0.0020279041,0.9383047,0.030944576,0.00018081849,0.0063034697,0.0034488565],"about_ca_topic_score_codex":0.00032998322,"about_ca_topic_score_gemma":0.000022198526,"teacher_disagreement_score":0.89554375,"about_ca_system_score_codex":0.0001557989,"about_ca_system_score_gemma":0.0001705978,"threshold_uncertainty_score":0.9999963},"labels":[],"label_agreement":null},{"id":"W2166715811","doi":"10.1109/59.852148","title":"New rotating transformation for efficient DSP control of active power-line conditioners","year":2000,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Quality and Harmonics","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"AC power; Electric power transmission; Electronic engineering; Computer science; Power control; Power (physics); Voltage; Line (geometry); Electric power system; Engineering; Control theory (sociology); Electrical engineering; Mathematics; Control (management); Physics","score_opus":0.014283544899717206,"score_gpt":0.23948262681431162,"score_spread":0.22519908191459442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166715811","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039825357,0.00012284158,0.9545998,0.00007014259,0.001263992,0.0008995031,0.0007562036,0.00022714578,0.0022349951],"genre_scores_gemma":[0.999265,0.000013981128,0.00025367262,0.000034038472,0.000014223389,0.00011483132,0.000014382353,0.00003762874,0.00025225422],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987194,0.000047697027,0.0005653734,0.00016671944,0.00024158364,0.00025922334],"domain_scores_gemma":[0.9993845,0.0001593895,0.000070875496,0.00019457686,0.00007332368,0.00011730709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021098873,0.0002016994,0.000328562,0.00014325173,0.00011600153,0.000032000687,0.000109977576,0.00013150439,0.00028767766],"category_scores_gemma":[0.0000024857118,0.00021191835,0.00019041057,0.00018563938,0.000026854359,0.00018086056,1.024995e-7,0.00018410999,0.00005259524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018900933,0.000085074935,1.6625383e-7,0.00014538666,0.0001831606,5.913155e-7,0.0041001113,0.98608506,0.0033296356,0.0005642648,0.00017661738,0.005140949],"study_design_scores_gemma":[0.00749236,0.0009692202,0.000041677715,0.00045062456,0.00024728486,0.000026179476,0.0024696267,0.8804649,0.0951207,0.00008156116,0.011840801,0.0007950795],"about_ca_topic_score_codex":0.000052097224,"about_ca_topic_score_gemma":0.000010245905,"teacher_disagreement_score":0.95943964,"about_ca_system_score_codex":0.00009719146,"about_ca_system_score_gemma":0.000046600362,"threshold_uncertainty_score":0.86417794},"labels":[],"label_agreement":null},{"id":"W2167001257","doi":"10.1109/tpwrs.2008.2009422","title":"Damping Interarea Oscillations by Multiple Modal Selectivity Method","year":2009,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Eigenvalues and eigenvectors; Modal; Electric power system; Control theory (sociology); Modal analysis; Power (physics); Damp; Damping ratio; Computer science; Physics; Engineering; Electronic engineering; Acoustics; Control (management); Artificial intelligence; Vibration; Quantum mechanics; Chemistry","score_opus":0.008904621331344679,"score_gpt":0.23224315861941575,"score_spread":0.22333853728807107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167001257","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037534903,0.00013381033,0.9853404,0.00006378601,0.002994001,0.0004896991,0.00018127951,0.00090782804,0.0061357035],"genre_scores_gemma":[0.9980174,0.000008169299,0.0013211152,0.000044852044,0.000007925985,0.000058434885,0.000008530974,0.000035602214,0.00049800123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984133,0.00018499774,0.00046429897,0.00034503083,0.00026040198,0.0003319171],"domain_scores_gemma":[0.99909425,0.0001713213,0.0000511346,0.0004293036,0.00009379746,0.00016021394],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032777793,0.0002714264,0.00034299633,0.00018699751,0.00020908534,0.0001202227,0.00015715216,0.00016001852,0.000076337696],"category_scores_gemma":[0.00001078024,0.0002811194,0.00014258361,0.00044512714,0.000017410219,0.00030969633,5.4543557e-7,0.0002927217,0.000055080953],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021224327,0.00015926347,0.000047726902,0.000041661435,0.00007968014,0.000001495851,0.0009740109,0.98866576,0.0061814566,0.000059314767,0.0030402532,0.00072818244],"study_design_scores_gemma":[0.00058298034,0.00011556936,0.00016386343,0.00007440382,0.000024246561,0.000031315438,0.00019427334,0.98066336,0.008014284,0.000012253507,0.009681302,0.00044211923],"about_ca_topic_score_codex":0.00007129213,"about_ca_topic_score_gemma":0.000041897238,"teacher_disagreement_score":0.9942639,"about_ca_system_score_codex":0.00027033905,"about_ca_system_score_gemma":0.000024774963,"threshold_uncertainty_score":0.9999641},"labels":[],"label_agreement":null},{"id":"W2167260650","doi":"10.1109/tpwrs.2004.841152","title":"Complementarity Model for Generator Buses in OPF-Based Maximum Loading Problems","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Complementarity (molecular biology); Maximum power principle; Electric power system; Control theory (sociology); Generator (circuit theory); Mathematical optimization; Interior point method; Point (geometry); Operating point; Computer science; Mathematical model; Mixed complementarity problem; Engineering; Power (physics); Mathematics; Voltage; Electronic engineering; Electrical engineering; Control (management)","score_opus":0.03201794510856738,"score_gpt":0.24397689365383513,"score_spread":0.21195894854526776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167260650","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062372596,0.00021241672,0.98968905,0.000069925016,0.0013836006,0.0012510185,0.0003428482,0.00038104926,0.0004328448],"genre_scores_gemma":[0.99551654,0.0000073425754,0.003589385,0.000093886054,0.000010685075,0.0005796645,0.000012643888,0.000054941862,0.00013492278],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998459,0.000055380453,0.00061740057,0.00030688418,0.0001853864,0.00037597117],"domain_scores_gemma":[0.9993392,0.00006711232,0.00004887102,0.00034889142,0.00007760246,0.00011832361],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034593424,0.00025138573,0.00033027065,0.0002303292,0.00012359372,0.00008632485,0.00016119781,0.00011924881,0.00006132998],"category_scores_gemma":[0.0000024639799,0.0002658104,0.00012215445,0.00022729133,0.000021498334,0.00021452738,5.890182e-7,0.00016768649,0.00002460596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001883414,0.00014103919,0.000051810985,0.00022559892,0.000029148665,3.2313304e-7,0.0004887308,0.99751073,0.000703104,0.000041158182,0.00071476656,0.00007476189],"study_design_scores_gemma":[0.0010754329,0.000039443465,0.000007409817,0.00010428865,0.000012958441,0.0000022012473,0.000083469175,0.98795956,0.0025826055,0.0000063585708,0.007851896,0.00027434636],"about_ca_topic_score_codex":0.00007992215,"about_ca_topic_score_gemma":0.001050732,"teacher_disagreement_score":0.98927927,"about_ca_system_score_codex":0.00045180964,"about_ca_system_score_gemma":0.000053406024,"threshold_uncertainty_score":0.99997944},"labels":[],"label_agreement":null},{"id":"W2167462623","doi":"10.1109/tpwrs.2003.820711","title":"Coordination in Markets With Nonconvexities as a Mathematical Program With Equilibrium Constraints—Part I: A Solution Procedure","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Lagrange multiplier; Economic dispatch; Mixed complementarity problem; Linear complementarity problem; Multiplier (economics); Linear programming; Mathematical economics; Complementarity (molecular biology); Computer science; Mathematics; Electric power system; Nonlinear system; Economics; Power (physics)","score_opus":0.00731066663993857,"score_gpt":0.2150448203760154,"score_spread":0.20773415373607684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167462623","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2687658,0.000052711803,0.7216492,0.00020742118,0.0005440618,0.0018983216,0.00007946496,0.00089855713,0.005904422],"genre_scores_gemma":[0.9982375,0.0000021385297,0.0006879534,0.000010568502,0.000013238074,0.0007831364,0.00001679065,0.000060852293,0.00018781453],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984437,0.000038724927,0.00038590003,0.0003062715,0.00039275247,0.0004326519],"domain_scores_gemma":[0.99942964,0.000036401994,0.000057995512,0.00024666902,0.00010836191,0.00012091143],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018808714,0.00031232,0.0003124094,0.0002103875,0.000067795925,0.00011948318,0.000106756066,0.00017527929,0.00006447558],"category_scores_gemma":[0.0000046821037,0.00026912987,0.00005572945,0.00045536188,0.0001864981,0.00041355472,7.590924e-7,0.00033425124,0.0001223829],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001757659,0.0034484942,0.00022167484,0.0033100042,0.00075541367,0.00032961837,0.0043362137,0.9719016,0.0059564454,0.005105133,0.0009208983,0.0019568442],"study_design_scores_gemma":[0.04274994,0.02246777,0.0027571144,0.025137872,0.0010249376,0.010816865,0.01864382,0.7723994,0.08686993,0.0012469239,0.0070967656,0.008788621],"about_ca_topic_score_codex":0.000038907052,"about_ca_topic_score_gemma":0.00008999662,"teacher_disagreement_score":0.7294717,"about_ca_system_score_codex":0.0004944638,"about_ca_system_score_gemma":0.00014056303,"threshold_uncertainty_score":0.9999761},"labels":[],"label_agreement":null},{"id":"W2167885813","doi":"10.1109/tpwrs.2003.818587","title":"An Electricity Market With a Probabilistic Spinning Reserve Criterion","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":269,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Probabilistic logic; Clearing; Reliability (semiconductor); Mathematical optimization; Electricity market; Market clearing; Electric power system; Power system simulation; Computation; Computer science; Electricity; Reliability engineering; Mathematics; Engineering; Power (physics); Algorithm; Economics","score_opus":0.007810291990077612,"score_gpt":0.20961303717999286,"score_spread":0.20180274518991526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167885813","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09276207,0.00016853081,0.89966786,0.000034093926,0.0021970023,0.00076879165,0.000037692953,0.0007851508,0.0035788156],"genre_scores_gemma":[0.99912626,0.000013259603,0.0002857644,0.000025480385,0.000025813993,0.00023346575,0.000001805449,0.000064550295,0.00022357932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983049,0.00009779085,0.00040134354,0.00039725113,0.00032259081,0.00047613808],"domain_scores_gemma":[0.99889225,0.000046335084,0.000049241717,0.00065961556,0.0001697278,0.00018281343],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039246684,0.00029510687,0.0003381445,0.0001831606,0.0001557172,0.00012351452,0.00023866963,0.00014919092,0.000032295735],"category_scores_gemma":[0.000010842747,0.00025441102,0.000083638384,0.00046773875,0.00005625603,0.00038956577,5.4804696e-7,0.0003577,0.000044466746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022677467,0.00033109123,0.000025444564,0.0007194709,0.000118085714,0.000048250324,0.0013503716,0.9928009,0.0035013675,0.00029008705,0.00043359978,0.00015455377],"study_design_scores_gemma":[0.019293487,0.019699382,0.004237692,0.01719929,0.00080409495,0.0026638878,0.0051443595,0.7430811,0.10214708,0.0011162972,0.074262716,0.010350615],"about_ca_topic_score_codex":0.00038836815,"about_ca_topic_score_gemma":0.00025535104,"teacher_disagreement_score":0.9063642,"about_ca_system_score_codex":0.00044863377,"about_ca_system_score_gemma":0.00006592809,"threshold_uncertainty_score":0.9999908},"labels":[],"label_agreement":null},{"id":"W2167900294","doi":"10.1109/tpwrs.2003.821619","title":"Order Reduction of the Dynamic Model of a Linear Weakly Periodic System—Part II: Frequency-Dependent Lines","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Frequency domain; Reduction (mathematics); Electric power transmission; Electric power system; Model order reduction; Control theory (sociology); Frequency response; Time domain; Mathematics; Linear system; Power (physics); Applied mathematics; Computer science; Mathematical analysis; Physics; Algorithm; Engineering; Electrical engineering","score_opus":0.007789824553489146,"score_gpt":0.21020611760202815,"score_spread":0.202416293048539,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167900294","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67057514,0.000102895494,0.32444048,0.00011035845,0.001953758,0.00040537326,0.00015318839,0.000051350053,0.002207459],"genre_scores_gemma":[0.99773794,0.0000029436308,0.00022405162,0.0000031794586,0.000040541454,0.0000777591,0.0000030340702,0.000027064389,0.0018835063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99863744,0.00005804331,0.00051891734,0.00025041585,0.0003064644,0.00022869708],"domain_scores_gemma":[0.9990435,0.0000114070945,0.00024003044,0.000478414,0.00017103445,0.000055607277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013791306,0.000194799,0.00031324447,0.00009730672,0.0002827228,0.000017584274,0.00021720513,0.00006712559,0.000026439591],"category_scores_gemma":[7.5929944e-7,0.00014525691,0.00017159889,0.00027780439,0.00008200662,0.0000887831,0.0000022013082,0.00021065045,0.000011326787],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004731927,0.0006848453,0.000030309282,0.00020502256,0.00028919472,3.4619097e-7,0.0036830197,0.7882868,0.20053102,0.0060943845,0.000038565388,0.000109153414],"study_design_scores_gemma":[0.009390042,0.0045802677,0.00014065945,0.005764367,0.0016377346,0.0001774611,0.022133939,0.3582143,0.5912658,0.00351143,0.0005196409,0.0026643875],"about_ca_topic_score_codex":0.0009631198,"about_ca_topic_score_gemma":0.000012834833,"teacher_disagreement_score":0.43007252,"about_ca_system_score_codex":0.00011581782,"about_ca_system_score_gemma":0.00022253577,"threshold_uncertainty_score":0.59234047},"labels":[],"label_agreement":null},{"id":"W2168211388","doi":"10.1109/tpwrs.2004.840376","title":"Screening and Mitigation of Exacerbated Market Power Due to Financial Transmission Rights","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Transmission (telecommunications); Position (finance); Transmission network; Power transmission; Market power; Mathematical optimization; Quadratic programming; Quadratic equation; Business; Economics; Computer science; Power (physics); Microeconomics; Finance; Telecommunications; Mathematics","score_opus":0.004312630940553618,"score_gpt":0.1891452348486838,"score_spread":0.1848326039081302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168211388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037246015,0.00030384026,0.95690733,0.000056237775,0.0009002266,0.000630906,0.0000349976,0.00029601835,0.0036244327],"genre_scores_gemma":[0.9965749,0.000016519547,0.002538166,0.000019911196,0.000019156289,0.00006302229,0.0000031752384,0.000048460257,0.0007167232],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846613,0.000090946596,0.0005587953,0.00027971598,0.0003139981,0.00029043603],"domain_scores_gemma":[0.9993382,0.000074407726,0.00006884785,0.0002529009,0.000090247755,0.00017540729],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025630297,0.00025304503,0.00035044042,0.00039561093,0.00012286734,0.00004340057,0.00011207481,0.00020310952,0.00012177515],"category_scores_gemma":[0.000003702252,0.0002552156,0.00007887524,0.0005350744,0.00002015859,0.0002729775,6.298571e-7,0.00018786587,0.00001974363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019005573,0.0001432492,0.000012846723,0.00025666962,0.00014589481,0.000013077847,0.002672445,0.96127325,0.022230616,0.000114897935,0.0052296105,0.007717365],"study_design_scores_gemma":[0.0029781193,0.000786502,0.001306725,0.001872242,0.00015131499,0.00027906746,0.00017150691,0.76748407,0.16734916,0.000017602695,0.05619654,0.0014071481],"about_ca_topic_score_codex":0.0000469716,"about_ca_topic_score_gemma":0.000020603793,"teacher_disagreement_score":0.95932883,"about_ca_system_score_codex":0.00011164745,"about_ca_system_score_gemma":0.000022497612,"threshold_uncertainty_score":0.99999},"labels":[],"label_agreement":null},{"id":"W2168492352","doi":"10.1109/tpwrs.2008.2004840","title":"A Stochastic Optimization Approach to Rating of Energy Storage Systems in Wind-Diesel Isolated Grids","year":2008,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":222,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Sizing; Diesel fuel; Wind power; Energy storage; Automotive engineering; Stochastic optimization; Engineering; Operating cost; Computer science; Environmental science; Waste management; Mathematical optimization; Electrical engineering; Power (physics)","score_opus":0.008460705945810195,"score_gpt":0.1773709523064089,"score_spread":0.1689102463605987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168492352","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003544363,0.000907049,0.99250096,0.0000050117355,0.0016359694,0.00053636794,0.00003797305,0.00023314398,0.00059913984],"genre_scores_gemma":[0.99853504,0.000060872422,0.0009937532,0.000008591833,0.000023913542,0.00014586798,0.000011461105,0.00005933642,0.00016117083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851835,0.00008755544,0.0006145633,0.0002572874,0.00023960088,0.00028263676],"domain_scores_gemma":[0.9993913,0.00005007079,0.00008044927,0.00027005194,0.00011120265,0.00009692884],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014857194,0.00024142224,0.000413407,0.00048317993,0.00009792943,0.000035186724,0.00013468465,0.00015992472,0.000007825492],"category_scores_gemma":[0.000004186665,0.00025196775,0.00007425713,0.00070573,0.00002151152,0.00018170667,9.701778e-7,0.00017024821,0.0000050626095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004108771,0.00010057921,0.000002569625,0.00009244296,0.000060628747,0.0000032526546,0.0010438986,0.9975361,0.0009758716,0.000020138037,0.000077236946,0.000046178775],"study_design_scores_gemma":[0.0006237356,0.00009706398,0.000006913109,0.00015731537,0.0000181199,0.000045586596,0.0002708194,0.9983597,0.00013555112,1.7840729e-7,0.00005348575,0.0002315618],"about_ca_topic_score_codex":0.00028663207,"about_ca_topic_score_gemma":0.000010760351,"teacher_disagreement_score":0.99499065,"about_ca_system_score_codex":0.00016627784,"about_ca_system_score_gemma":0.000031699925,"threshold_uncertainty_score":0.99999326},"labels":[],"label_agreement":null},{"id":"W2170320502","doi":"10.1109/tpwrs.2005.862000","title":"Bulk Electric System Well-Being Analysis Using Sequential Monte Carlo Simulation","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Monte Carlo method; Electric power system; Probabilistic logic; Computer science; Reliability engineering; Transmission system; Transmission (telecommunications); Engineering; Power (physics); Statistics; Mathematics; Artificial intelligence","score_opus":0.00725077268151302,"score_gpt":0.21083928226572365,"score_spread":0.20358850958421063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2170320502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16086581,0.00031075088,0.8308706,0.000004724082,0.0037937143,0.0004904382,0.000030047906,0.00080220064,0.0028316563],"genre_scores_gemma":[0.99922657,0.0000050969957,0.00007559164,0.0000051879665,0.000069755006,0.000060589584,0.0000022637266,0.00006937178,0.00048560018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99760884,0.00014490684,0.0008168318,0.00044110508,0.00044542845,0.00054291094],"domain_scores_gemma":[0.99894005,0.000103527134,0.000121595,0.00057862746,0.00014515188,0.000111077214],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037297563,0.00036579487,0.0005985828,0.0007287985,0.00023970168,0.00015380977,0.00019307232,0.00024220634,0.000018969384],"category_scores_gemma":[0.000002061876,0.0003784485,0.00041900633,0.0015547003,0.000031891068,0.00028622983,0.0000010039182,0.00028591414,0.00008181939],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016996439,0.000039098173,0.000045517587,0.00025491702,0.00045024042,0.000015717607,0.00019070179,0.99663746,0.0021602276,0.00012989316,0.000040940697,0.000018310173],"study_design_scores_gemma":[0.0003007365,0.00003533119,0.00004593561,0.00017195543,0.00054846867,0.000031841937,0.0002259552,0.9945885,0.002796777,0.000002306395,0.0008717259,0.00038044376],"about_ca_topic_score_codex":0.0027014043,"about_ca_topic_score_gemma":0.00021670043,"teacher_disagreement_score":0.8383607,"about_ca_system_score_codex":0.0010568574,"about_ca_system_score_gemma":0.000036812056,"threshold_uncertainty_score":0.9998667},"labels":[],"label_agreement":null},{"id":"W2171081361","doi":"10.1109/tpwrs.2004.840449","title":"Composite System Maintenance Coordination in a Deregulated Environment","year":2005,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Preventive maintenance; Scheduling (production processes); Reliability engineering; Predictive maintenance; Maintenance engineering; Electric power system; Planned maintenance; Computer science; Load management; Operator (biology); Operations research; Engineering; Operations management","score_opus":0.005014470319177335,"score_gpt":0.17541768267007096,"score_spread":0.17040321235089362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171081361","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061598472,0.0004605094,0.93042165,0.00015925532,0.0024565696,0.00080229325,0.000049487426,0.0006302035,0.0034215797],"genre_scores_gemma":[0.9984193,0.000021231663,0.00015250724,0.000020200614,0.000016531576,0.0002272287,0.000002516333,0.000049067527,0.0010914333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99825627,0.000097468626,0.00061249855,0.0003313272,0.00027470727,0.00042773248],"domain_scores_gemma":[0.9992863,0.00005393404,0.000061356965,0.00045138138,0.000034115994,0.00011289386],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032671983,0.00027563432,0.00036682587,0.00023042467,0.00008015684,0.00004989973,0.00018585256,0.0001721352,0.000025695428],"category_scores_gemma":[0.0000012819148,0.00027380392,0.000105434316,0.0002471678,0.000040588275,0.0002311326,9.899985e-7,0.000270462,0.00045062043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033183158,0.0001264348,0.000023399443,0.0003134786,0.00005770355,0.000015485462,0.00063470117,0.99265003,0.0044235955,0.0003655656,0.0007464021,0.0006100393],"study_design_scores_gemma":[0.0023190912,0.00014420952,0.00068653055,0.0018607862,0.00004151698,0.00024022732,0.0012834084,0.92293346,0.012295043,0.000005674745,0.057303865,0.00088618643],"about_ca_topic_score_codex":0.00009288119,"about_ca_topic_score_gemma":0.000051178948,"teacher_disagreement_score":0.9368208,"about_ca_system_score_codex":0.0011348304,"about_ca_system_score_gemma":0.000013647123,"threshold_uncertainty_score":0.9999714},"labels":[],"label_agreement":null},{"id":"W2172171685","doi":"10.1109/tpwrs.2007.894858","title":"Negotiating Bilateral Contracts in Electricity Markets","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Spot contract; Forward contract; Negotiation; Regret; Spot market; Electricity; Electricity market; Microeconomics; Vendor; Generator (circuit theory); Economics; Forward price; Business; Computer science; Finance; Marketing; Power (physics); Engineering","score_opus":0.0055624995670086955,"score_gpt":0.20109169869598606,"score_spread":0.19552919912897737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172171685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.083035514,0.00042116165,0.90331566,0.000008934987,0.0044171293,0.0006120413,0.000010106109,0.0005255113,0.00765392],"genre_scores_gemma":[0.9992878,0.00003323125,0.00013864246,0.000021118936,0.000026532154,0.000049103535,0.0000024825736,0.00007144108,0.00036968026],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99790055,0.00009745132,0.0007235344,0.00028664796,0.0003269226,0.0006649065],"domain_scores_gemma":[0.9991699,0.0002431406,0.00008190118,0.0002992238,0.00006966987,0.00013617473],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008213517,0.00027988138,0.000343488,0.00064805493,0.0000862851,0.0001032862,0.00015979091,0.0002331514,0.000025112322],"category_scores_gemma":[0.00001038815,0.00029928127,0.00007765969,0.00096825976,0.000013136414,0.00030326803,4.5626552e-7,0.00045277047,0.000066292225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073799274,0.0001205274,0.0002734053,0.00007840516,0.0000812742,0.00006319114,0.00050307804,0.9920919,0.005411284,0.00006321153,0.00035765662,0.0008822437],"study_design_scores_gemma":[0.002180001,0.0002272727,0.0043717725,0.0003781109,0.000043602402,0.00023928157,0.00021690881,0.9652561,0.023170996,0.0000063313096,0.0028653597,0.0010442908],"about_ca_topic_score_codex":0.00018363382,"about_ca_topic_score_gemma":0.00007301513,"teacher_disagreement_score":0.91625226,"about_ca_system_score_codex":0.000510924,"about_ca_system_score_gemma":0.000030465186,"threshold_uncertainty_score":0.99994594},"labels":[],"label_agreement":null},{"id":"W2178564072","doi":"10.1109/tpwrs.2012.2187345","title":"A Practical Real-Time OPF Method Using New Triangular Approximate Model of Wind Electric Generators","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Monte Carlo method; Probabilistic logic; Electric power system; Wind power; Wind speed; Economic dispatch; Transmission (telecommunications); Engineering; Computer science; Mathematical optimization; Simulation; Power (physics); Control theory (sociology); Real-time computing; Statistics; Electrical engineering; Mathematics; Control (management)","score_opus":0.03125046962274885,"score_gpt":0.2789079514905259,"score_spread":0.24765748186777703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178564072","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008563309,0.00031379526,0.9865633,0.000010071787,0.0020509767,0.0007724047,0.000023883838,0.00039652456,0.0013057381],"genre_scores_gemma":[0.9307213,0.00004468821,0.068262175,0.000007095786,0.000068459645,0.000032271902,0.0000030740355,0.0001407466,0.0007202158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99746203,0.00027228022,0.00085724576,0.00029774682,0.000469267,0.0006414129],"domain_scores_gemma":[0.9986953,0.00014940761,0.00020007958,0.0005450162,0.00010145564,0.000308731],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008796924,0.0003596233,0.0006042817,0.00053807144,0.00009648355,0.00005547527,0.0001587238,0.0003078207,0.00003848622],"category_scores_gemma":[0.000015380021,0.0003703911,0.0001804868,0.0010191725,0.000013173361,0.0005631279,0.0000011529859,0.00030533306,0.00004265751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030577885,0.0001058647,0.0000029371458,0.00009377225,0.00019605324,0.0000015531002,0.00044405815,0.84886426,0.14938252,0.00015159756,0.0006327203,0.00009408456],"study_design_scores_gemma":[0.0005090623,0.000066110064,9.165676e-7,0.000059331283,0.00017155841,0.00010730059,0.00003441923,0.8927601,0.10586469,0.0000046608698,0.00010832293,0.0003135433],"about_ca_topic_score_codex":0.00013601477,"about_ca_topic_score_gemma":9.2547117e-7,"teacher_disagreement_score":0.92215794,"about_ca_system_score_codex":0.00038747245,"about_ca_system_score_gemma":0.00018706694,"threshold_uncertainty_score":0.99987483},"labels":[],"label_agreement":null},{"id":"W2178856536","doi":"10.1109/tpwrs.2013.2248398","title":"A Unified Distribution System State Estimator Using the Concept of Augmented Matrices","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; University of British Columbia","funders":"","keywords":"Estimator; Convergence (economics); Transformer; State estimator; Computer science; Electric power system; Smart grid; Grid; Power flow; AC power; Mathematical optimization; Algorithm; State (computer science); Voltage; Engineering; Power (physics); Mathematics","score_opus":0.010600261194756974,"score_gpt":0.21342540991475523,"score_spread":0.20282514871999824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178856536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04259001,0.00025059565,0.95249367,0.000014602201,0.00253911,0.0009536443,0.00037754877,0.00038269485,0.00039815422],"genre_scores_gemma":[0.99961096,0.0000050664203,0.00011774734,0.0000034110053,0.0000037984928,0.000107597894,0.000008946746,0.000030339712,0.00011214274],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846286,0.00015929132,0.0006309247,0.00018641377,0.00031219807,0.00024830017],"domain_scores_gemma":[0.99905187,0.00009770013,0.00013252241,0.00043525593,0.00018799925,0.00009468189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023857766,0.00021094152,0.00031915813,0.000082790924,0.00016573479,0.000106398256,0.00019993754,0.00009009922,0.00006293755],"category_scores_gemma":[0.0000032315677,0.00015953797,0.00010881383,0.000399038,0.000064350366,0.00022273515,0.0000011084031,0.00014716956,0.000043600958],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011407487,0.00004505816,0.000018554229,0.00027849077,0.00012052585,0.0000012151866,0.00062380417,0.9971313,0.0011051731,0.00022007697,0.00039951544,0.00004486343],"study_design_scores_gemma":[0.00043503704,0.00004670828,0.00010057997,0.00026044578,0.000049220544,0.000035695168,0.0021575436,0.989911,0.0061992137,0.0000016949839,0.0005795962,0.00022327465],"about_ca_topic_score_codex":0.00043705283,"about_ca_topic_score_gemma":0.0000063304287,"teacher_disagreement_score":0.95702094,"about_ca_system_score_codex":0.00028017722,"about_ca_system_score_gemma":0.000033103224,"threshold_uncertainty_score":0.650577},"labels":[],"label_agreement":null},{"id":"W2180269203","doi":"10.1109/tpwrs.2013.2271980","title":"Identification of Umbrella Constraints in DC-Based Security-Constrained Optimal Power Flow","year":2013,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Mathematical optimization; Power flow; Constraint (computer-aided design); Set (abstract data type); Optimization problem; Computer science; Power (physics); Mathematics; Electric power system","score_opus":0.005698909431682394,"score_gpt":0.20064812216742858,"score_spread":0.1949492127357462,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180269203","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055632997,0.00012436409,0.9375338,0.00004130797,0.0025399905,0.0011963932,0.00010170369,0.0003341181,0.0024953277],"genre_scores_gemma":[0.9990644,0.000010299458,0.00040121216,0.000013501549,0.000007779093,0.0002632926,0.000009286799,0.000068599955,0.00016163537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99757266,0.00014613984,0.0011165132,0.00035420974,0.00039396805,0.00041651915],"domain_scores_gemma":[0.99886,0.0001411665,0.00016676381,0.00050800183,0.00019766057,0.00012641848],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040273883,0.00031941902,0.00045067488,0.0006454442,0.000058634385,0.000094219635,0.00023931301,0.00027147506,0.00033922456],"category_scores_gemma":[0.000010530161,0.00035537366,0.00014155734,0.0007520352,0.00011962902,0.00031885516,7.0911926e-7,0.00032497125,0.00021302997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013748505,0.00016941219,0.000025572439,0.00020342623,0.000083485356,0.0000053699932,0.0007232483,0.97314906,0.02495573,0.00007818525,0.00035936592,0.00023340777],"study_design_scores_gemma":[0.0012329402,0.000112341215,0.00010218552,0.00029918074,0.000030518215,0.00003724658,0.00041798802,0.9456374,0.0515724,0.000009586111,0.00010613613,0.00044209647],"about_ca_topic_score_codex":0.00007129192,"about_ca_topic_score_gemma":0.000014610435,"teacher_disagreement_score":0.9434314,"about_ca_system_score_codex":0.00023921361,"about_ca_system_score_gemma":0.00008483829,"threshold_uncertainty_score":0.99988985},"labels":[],"label_agreement":null},{"id":"W2180380942","doi":"10.1109/tpwrs.2012.2227845","title":"A Type-4 Wind Power Plant Equivalent Model for the Analysis of Electromagnetic Transients in Power Systems","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Wind power; Control theory (sociology); Induction generator; Equivalent circuit; Turbine; Electric power system; Component (thermodynamics); Frequency response; Power (physics); Engineering; Range (aeronautics); Control engineering; Computer science; Electrical engineering; Physics; Control (management); Voltage","score_opus":0.017851046958619325,"score_gpt":0.24355800839853242,"score_spread":0.2257069614399131,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180380942","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46733066,0.0009410773,0.5263595,0.000051204035,0.0017332206,0.0010735212,0.0004441863,0.00003580211,0.002030829],"genre_scores_gemma":[0.99824774,0.0000064702153,0.00002932076,0.0000161824,0.000018001225,0.00018364002,0.000016212714,0.00003865735,0.0014437478],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99789906,0.00010708249,0.0006211864,0.000316429,0.00035692964,0.00069930154],"domain_scores_gemma":[0.9988766,0.00020680891,0.0001727647,0.00051021506,0.00009585433,0.0001377791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045077034,0.00029322473,0.00057162385,0.00038840936,0.00014795503,0.000055727996,0.00027087686,0.00008581626,0.00011749474],"category_scores_gemma":[0.0000013108889,0.0002189387,0.00032212862,0.0008007817,0.000047364112,0.00013336781,0.0000014767083,0.00023595754,0.000014932003],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010782962,0.004393762,0.0029713141,0.00021623285,0.009198782,0.0000020665022,0.027548144,0.9060149,0.033862054,0.012754191,0.0017670292,0.0001932166],"study_design_scores_gemma":[0.0053259013,0.0033359919,0.005103382,0.00042121546,0.005981828,0.000016934258,0.0059935,0.9631045,0.0042404057,0.0001264837,0.004493654,0.0018562109],"about_ca_topic_score_codex":0.00037004787,"about_ca_topic_score_gemma":0.000012217975,"teacher_disagreement_score":0.5309171,"about_ca_system_score_codex":0.00009098124,"about_ca_system_score_gemma":0.00007295383,"threshold_uncertainty_score":0.8928061},"labels":[],"label_agreement":null},{"id":"W2181109213","doi":"10.1109/tpwrs.2012.2199336","title":"Online Tracking of Voltage-Dependent Load Parameters Using ULTC Created Disturbances","year":2012,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Control theory (sociology); Voltage; Tracking (education); Voltage regulation; Electric power system; Computer science; Engineering; Power (physics); Electrical engineering; Control (management); Physics","score_opus":0.029708049249230945,"score_gpt":0.24880893408203517,"score_spread":0.2191008848328042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181109213","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17923486,0.00081183325,0.81391805,0.000002855075,0.004425668,0.0003436908,0.00020007954,0.00027855972,0.0007843769],"genre_scores_gemma":[0.9993148,0.000023196742,0.00036977668,0.000007450957,0.000010817532,0.00002307021,0.0000046701603,0.000048886996,0.00019736124],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826103,0.000095033516,0.00065264734,0.0002092552,0.00040640475,0.0003756036],"domain_scores_gemma":[0.99911237,0.00008358727,0.00011143532,0.00039919195,0.00012985377,0.0001635828],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035094563,0.00025940247,0.00042214297,0.00014341676,0.000092776776,0.000047545724,0.00015342452,0.0001458975,0.00006563304],"category_scores_gemma":[0.000008988735,0.00024528333,0.00015321218,0.00031055926,0.0000501759,0.00036617453,8.3989175e-7,0.0002054845,0.000017702778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034507935,0.00045045593,0.00084454793,0.00028692704,0.000203591,0.0000020443435,0.0019380419,0.98989636,0.006109479,0.000019124953,0.00006744021,0.00014749735],"study_design_scores_gemma":[0.0026119591,0.000284146,0.0023734344,0.001177257,0.00040167052,0.00015509508,0.0057270657,0.89462316,0.0867453,0.0000039474294,0.0040813554,0.0018155896],"about_ca_topic_score_codex":0.0002839382,"about_ca_topic_score_gemma":0.000052816846,"teacher_disagreement_score":0.8200799,"about_ca_system_score_codex":0.00032246305,"about_ca_system_score_gemma":0.000031261527,"threshold_uncertainty_score":0.99999994},"labels":[],"label_agreement":null},{"id":"W2181599198","doi":"10.1109/tpwrs.2004.838578","title":"Electric Power Engineering Education Resources 2001–02 IEEE Power Engineering Society Committee Report","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Experimental Learning in Engineering","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Accreditation; Engineering education; Electric power; Engineering management; Power engineering; Engineering; Power (physics); Political science; Medical education; Electric power system; Medicine","score_opus":0.005358293974776986,"score_gpt":0.20715357967183026,"score_spread":0.20179528569705327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181599198","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2707908,0.001615781,0.71049374,0.000047784644,0.011692761,0.00064755784,0.000018316394,0.0025746545,0.0021186243],"genre_scores_gemma":[0.9957871,0.000054817996,0.0026841173,0.00003952649,0.00010857883,0.00029302743,0.000007581974,0.00032762962,0.00069766596],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99691266,0.000028684623,0.0008660444,0.00060618785,0.0006292254,0.000957212],"domain_scores_gemma":[0.99846447,0.000109872955,0.00011345253,0.00087011664,0.00010733557,0.00033473136],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003781568,0.0007167658,0.0005584318,0.00050439255,0.00020248894,0.0001988706,0.00039827995,0.000393397,0.00008567255],"category_scores_gemma":[0.00001639521,0.0008385923,0.000394674,0.00090307445,0.000027559934,0.00044690777,0.0000035165988,0.0011454762,0.00018065287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067758856,0.00014354476,0.000010792732,0.00015263366,0.00023103158,0.000035242618,0.0015508098,0.88393235,0.11243357,0.000045336546,0.001425985,0.00003194605],"study_design_scores_gemma":[0.0033221098,0.0010000963,0.0008719716,0.0031715676,0.00031193823,0.0034296662,0.0030817967,0.43304163,0.37410352,0.000010197919,0.17163622,0.0060192817],"about_ca_topic_score_codex":0.000098467644,"about_ca_topic_score_gemma":0.0000025740842,"teacher_disagreement_score":0.72499627,"about_ca_system_score_codex":0.0012504057,"about_ca_system_score_gemma":0.000099779034,"threshold_uncertainty_score":0.9994065},"labels":[],"label_agreement":null},{"id":"W2276034344","doi":"10.1109/tpwrs.2015.2431820","title":"One Markov Model for Spare Analysis of Distribution Power Transformers","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Transformer; Reliability engineering; Probabilistic logic; Markov chain; Distribution transformer; Computer science; Engineering; Electrical engineering; Voltage; Artificial intelligence; Machine learning; Mechanical engineering","score_opus":0.023649470207298687,"score_gpt":0.23101574265030483,"score_spread":0.20736627244300615,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2276034344","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010033134,0.00020883177,0.9831586,0.000039506365,0.0019161549,0.0007130642,0.0024014714,0.00021280683,0.0013164204],"genre_scores_gemma":[0.99903965,0.000020166592,0.0002103111,0.000009779274,0.000005570028,0.00021956055,0.00005058438,0.000036016558,0.00040833527],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983696,0.00004065368,0.00061416056,0.00027774193,0.00034502367,0.00035283034],"domain_scores_gemma":[0.99902153,0.0000723911,0.00007336002,0.0003990521,0.00024024364,0.00019342985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046298368,0.00022878604,0.0006020867,0.00025517042,0.000057880105,0.000027347614,0.00016477091,0.00018322251,0.000014638027],"category_scores_gemma":[0.000008012104,0.0002363106,0.0004067771,0.0006724302,0.000049304595,0.00019269832,4.5568476e-7,0.00014383004,0.000011053689],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012172936,0.0001457715,0.000008832038,0.00022401004,0.0011055876,4.885024e-7,0.0010739331,0.9954081,0.0004434831,0.00016270224,0.001091622,0.00021373776],"study_design_scores_gemma":[0.00074310706,0.00017426492,0.000045615034,0.00012382271,0.0007224252,0.000002569033,0.000638872,0.9925282,0.0021834695,0.000017005688,0.0025072384,0.00031343603],"about_ca_topic_score_codex":0.000072683,"about_ca_topic_score_gemma":0.00010859239,"teacher_disagreement_score":0.9890065,"about_ca_system_score_codex":0.00031509966,"about_ca_system_score_gemma":0.000055176584,"threshold_uncertainty_score":0.9636467},"labels":[],"label_agreement":null},{"id":"W2319164985","doi":"10.1109/tpwrs.2014.2321287","title":"Analysis and Impacts of Implementing Droop Control in DFIG-Based Wind Turbines on Microgrid/Weak-Grid Stability","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":158,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Voltage droop; Microgrid; Wind power; Control theory (sociology); Controller (irrigation); Induction generator; Automatic frequency control; Turbine; AC power; Engineering; Electric power system; Power (physics); Control engineering; Computer science; Renewable energy; Voltage; Voltage regulator; Control (management); Electrical engineering","score_opus":0.0047325306430589555,"score_gpt":0.19519747389913797,"score_spread":0.19046494325607902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2319164985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3937206,0.0002995052,0.60457104,0.000032029093,0.000505054,0.00043735473,0.00017991796,0.00010128232,0.00015318685],"genre_scores_gemma":[0.99980396,0.000024726967,0.00005742273,0.000026048432,0.000018220171,0.000027770055,0.000010328964,0.000025782709,0.0000057363345],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985735,0.00012570046,0.00055421656,0.0002586996,0.000174314,0.00031358039],"domain_scores_gemma":[0.999241,0.0001938527,0.00009378686,0.0003100404,0.00007324898,0.000088075394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051185495,0.00022201723,0.00049263664,0.0004734611,0.00006377883,0.000054789143,0.000088031586,0.00010099583,0.00004916443],"category_scores_gemma":[0.000007953963,0.00020897313,0.00015364954,0.00054807425,0.000029582086,0.00010291712,5.5515943e-7,0.00016205368,0.0000037488617],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009694251,0.00012071121,0.00657467,0.00015442101,0.00038782033,8.493405e-7,0.00023407469,0.97208095,0.019317549,0.0000048904963,0.000026090042,0.0010010193],"study_design_scores_gemma":[0.0025983886,0.00019820782,0.0058433926,0.000111335496,0.00032093807,0.0000017575437,0.00014344978,0.96862614,0.021380119,0.0000011785581,0.00048901135,0.0002860677],"about_ca_topic_score_codex":0.00034309324,"about_ca_topic_score_gemma":0.00061953225,"teacher_disagreement_score":0.6060834,"about_ca_system_score_codex":0.00007882533,"about_ca_system_score_gemma":0.000016929296,"threshold_uncertainty_score":0.85216767},"labels":[],"label_agreement":null},{"id":"W2321805541","doi":"10.1109/tpwrs.2016.2540959","title":"Analysis and Performance Enhancement of Vector-Controlled VSC in HVDC Links Connected to Very Weak Grids","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":163,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Voltage source; Grid; Control theory (sociology); AC power; Transmission system; Computer science; Synchronization (alternating current); Nonlinear system; Vector control; Electronic engineering; Transmission (telecommunications); Engineering; Voltage; Control engineering; Topology (electrical circuits); Control (management); Electrical engineering; Mathematics; Telecommunications; Physics","score_opus":0.00594297433072664,"score_gpt":0.2014190599180895,"score_spread":0.19547608558736287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2321805541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50237024,0.00009587447,0.49568874,0.000020135078,0.0009773351,0.000491353,0.000012445362,0.00006629131,0.00027760645],"genre_scores_gemma":[0.9990364,0.00006264595,0.000031187,0.0000043789723,0.000016933454,0.0003541041,5.852367e-7,0.000021958176,0.0004718242],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998707,0.00006693317,0.00056849717,0.00023151995,0.00020114149,0.00022491212],"domain_scores_gemma":[0.9994379,0.00007756404,0.00006334755,0.00026963503,0.00006489858,0.00008663534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003107107,0.00018526282,0.00055238215,0.00060533726,0.000046472738,0.00002257021,0.00007675587,0.00017886348,0.00005003766],"category_scores_gemma":[0.000004799893,0.00013952897,0.00011560227,0.00067864184,0.000017107426,0.0001341825,7.402463e-7,0.0001556975,0.00003325679],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022671,0.00049959245,0.004524778,0.0012351718,0.004858145,0.000011963162,0.0046474766,0.23325014,0.7287076,0.00007332433,0.00018725285,0.019737475],"study_design_scores_gemma":[0.027488697,0.004098192,0.040514216,0.0046055545,0.0013892693,0.000066199114,0.0014385158,0.35200554,0.559659,0.0000047303774,0.0060381796,0.0026918943],"about_ca_topic_score_codex":0.0002125782,"about_ca_topic_score_gemma":0.00016460646,"teacher_disagreement_score":0.49666616,"about_ca_system_score_codex":0.00015085899,"about_ca_system_score_gemma":0.000013618376,"threshold_uncertainty_score":0.56898266},"labels":[],"label_agreement":null},{"id":"W2330456757","doi":"10.1109/tpwrs.2014.2327041","title":"Home Appliance Load Modeling From Aggregated Smart Meter Data","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":149,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Smart meter; Smart grid; Metering mode; Home automation; Real-time computing; Hidden Markov model; Computer science; Demand response; Duration (music); Automatic meter reading; Data modeling; Electric power system; Markov chain; Load management; Power (physics); Engineering; Electricity; Telecommunications; Electrical engineering; Database; Wireless; Artificial intelligence","score_opus":0.024750371377631784,"score_gpt":0.2106625876590565,"score_spread":0.1859122162814247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330456757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01536803,0.00031444733,0.9721294,0.00002482526,0.007925135,0.00024003357,0.00014104859,0.00080787484,0.0030492179],"genre_scores_gemma":[0.99847955,0.000046703877,0.0006024408,0.000046163976,0.00007900984,0.000097541706,0.000034095698,0.000088690605,0.000525815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99835294,0.000055172317,0.00038500925,0.00048265717,0.00038665987,0.00033757644],"domain_scores_gemma":[0.99818605,0.00006224141,0.00003661849,0.0015562883,0.00004449816,0.00011432401],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026685448,0.000281059,0.00030815098,0.00012418043,0.00008964212,0.00010720958,0.0005726143,0.00011922974,0.000090512076],"category_scores_gemma":[0.0000026154698,0.00028925692,0.00005672822,0.00022729531,0.000018215249,0.00029994376,0.000004644845,0.00023687593,0.00057573325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010817868,0.000027138061,0.0000055071737,0.000038441893,0.00019749267,0.0000030820345,0.00007311476,0.9962757,0.0007882794,0.00001737174,0.0020492831,0.00051377714],"study_design_scores_gemma":[0.00040800724,0.00002398615,0.000011233448,0.000121533434,0.000059896487,0.0000027722895,0.000044035405,0.9674005,0.00085211254,0.000011961739,0.030735394,0.00032856895],"about_ca_topic_score_codex":0.00065746036,"about_ca_topic_score_gemma":0.00014750133,"teacher_disagreement_score":0.9831115,"about_ca_system_score_codex":0.00016665747,"about_ca_system_score_gemma":0.000011969892,"threshold_uncertainty_score":0.99995595},"labels":[],"label_agreement":null},{"id":"W2330579332","doi":"10.1109/tpwrs.2014.2310182","title":"Reliability-Based Incremental PMU Placement","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Hydro (Canada)","funders":"","keywords":"Observability; Phasor measurement unit; Reliability (semiconductor); Phasor; Node (physics); Reliability engineering; Electric power system; Units of measurement; Integer programming; Computer science; Engineering; Mathematical optimization; Algorithm; Mathematics; Power (physics)","score_opus":0.008067402545573287,"score_gpt":0.20426156229860268,"score_spread":0.1961941597530294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330579332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0097332345,0.000032766497,0.972785,0.00002590418,0.004528829,0.00053437584,0.00006053739,0.0007295292,0.011569831],"genre_scores_gemma":[0.9989616,0.0000024342876,0.00040122226,0.000067952606,0.0000066405123,0.00016057881,0.0000064784513,0.000045636385,0.00034743737],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983491,0.00017941288,0.0005028337,0.00030860776,0.0003609598,0.00029911706],"domain_scores_gemma":[0.9990045,0.000107609754,0.00004401595,0.0006123208,0.00007065338,0.00016089449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055161107,0.00025014038,0.00028948527,0.00015176416,0.00013433353,0.000074416996,0.00016599512,0.00012587445,0.00029830865],"category_scores_gemma":[0.000005231585,0.00024365954,0.00012991036,0.00022298444,0.000038162816,0.00012539636,6.1089605e-7,0.00020089874,0.00027086586],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027281207,0.00012187241,0.00003457599,0.0001433111,0.00003348181,6.424769e-7,0.00017733187,0.997582,0.00084381347,0.00006614881,0.00092267623,0.00004687154],"study_design_scores_gemma":[0.0012590832,0.00023214573,0.00007626902,0.000111583475,0.000029270806,0.000006437312,0.00025243952,0.95230937,0.00998749,0.0000034107666,0.035258774,0.00047371947],"about_ca_topic_score_codex":0.000038626004,"about_ca_topic_score_gemma":0.000019528901,"teacher_disagreement_score":0.98922837,"about_ca_system_score_codex":0.00030735502,"about_ca_system_score_gemma":0.000025500223,"threshold_uncertainty_score":0.99361473},"labels":[],"label_agreement":null},{"id":"W2331483747","doi":"10.1109/tpwrs.2014.2309004","title":"Optimal Placement of GIC Blocking Devices for Geomagnetic Disturbance Mitigation","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":57,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Geomagnetically induced current; AC power; Electric power system; Transformer; Control theory (sociology); Geomagnetic storm; Electromagnetic coil; Voltage; Engineering; Voltage optimisation; Electrical engineering; Electric power transmission; Current transformer; Computer science; Earth's magnetic field; Power (physics); Physics; Magnetic field","score_opus":0.006121095335452574,"score_gpt":0.2140200837310441,"score_spread":0.2078989883955915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2331483747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36600778,0.000051241568,0.6311932,0.000034324843,0.0005482363,0.00027962305,0.000033901455,0.000024801346,0.0018268658],"genre_scores_gemma":[0.9981739,4.974838e-7,0.0004580604,0.000011876666,0.000053636108,0.0001887817,0.00000747816,0.00001807565,0.0010876944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990729,0.000042707128,0.00029070635,0.00021420053,0.0001518242,0.00022767288],"domain_scores_gemma":[0.99944055,0.00010356075,0.00013356586,0.00020304197,0.00006388084,0.0000553929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014770847,0.00014225191,0.00020707968,0.00006188004,0.00013831376,0.000038223665,0.00010780171,0.000030181433,0.00005543062],"category_scores_gemma":[7.2693797e-7,0.00013168494,0.00009528141,0.00009333538,0.000028871318,0.0000607345,5.6923653e-7,0.00007596194,0.000011474944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006735502,0.0029717172,0.0038502864,0.0014233402,0.0015324804,9.4617195e-7,0.00846435,0.8194707,0.10898473,0.037233304,0.0029819985,0.012412573],"study_design_scores_gemma":[0.0167887,0.017026676,0.0048603597,0.0025882071,0.0015417545,0.000020792204,0.006318888,0.42384002,0.4362013,0.0018625443,0.08488077,0.0040699965],"about_ca_topic_score_codex":0.000066032175,"about_ca_topic_score_gemma":0.0000020063676,"teacher_disagreement_score":0.63216615,"about_ca_system_score_codex":0.000024595463,"about_ca_system_score_gemma":0.000020550111,"threshold_uncertainty_score":0.5369956},"labels":[],"label_agreement":null},{"id":"W2333016612","doi":"10.1109/tpwrs.2014.2306016","title":"New Family of Microgrid Control and Management Strategies in Smart Distribution Grids—Analysis, Comparison and Testing","year":2014,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Microgrid; Islanding; Converters; Controller (irrigation); AC power; Smart grid; Grid; Computer science; Network topology; Distributed generation; Control theory (sociology); Control engineering; Power control; Power (physics); Engineering; Electronic engineering; Voltage; Control (management); Electrical engineering; Renewable energy","score_opus":0.006322768341396895,"score_gpt":0.19517428677038373,"score_spread":0.18885151842898684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2333016612","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025274763,0.0021052114,0.9716735,0.000012826004,0.00031724243,0.0002682599,0.00006514114,0.00007589152,0.00020715797],"genre_scores_gemma":[0.999039,0.00021582584,0.00067835575,0.0000050203043,0.0000085660795,0.0000147888295,0.000016099075,0.000011200784,0.000011148662],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991465,0.00004738131,0.0003643209,0.0001918399,0.00010225106,0.0001476829],"domain_scores_gemma":[0.99958205,0.000076155935,0.000055707384,0.00020123647,0.000030678275,0.000054163287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020489276,0.00013627677,0.0003257641,0.00016739665,0.00004085003,0.000075700555,0.00007600624,0.00006070602,0.0000017997868],"category_scores_gemma":[0.0000015742769,0.00013607948,0.0000318588,0.0003293581,0.000019303445,0.00013509624,0.0000011244318,0.00009584039,0.000001336496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025366262,0.00003385409,0.001456149,0.00016877647,0.00038421876,0.0000011139832,0.0001207083,0.9882262,0.0018557649,0.00008465055,0.00012050799,0.0075226845],"study_design_scores_gemma":[0.0011409099,0.00006296989,0.01178887,0.0000910413,0.00035493157,0.00000344589,0.00033481885,0.9850476,0.00017032195,0.0000058771534,0.0008411488,0.00015807502],"about_ca_topic_score_codex":0.00039916302,"about_ca_topic_score_gemma":0.00019693679,"teacher_disagreement_score":0.97376424,"about_ca_system_score_codex":0.000028415943,"about_ca_system_score_gemma":0.0000075098883,"threshold_uncertainty_score":0.554916},"labels":[],"label_agreement":null},{"id":"W2334439829","doi":"10.1109/tpwrs.2016.2533540","title":"A Linear Power Flow Formulation for Three-Phase Distribution Systems","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Power flow; Control theory (sociology); Power-flow study; Electric power system; AC power; Flow (mathematics); Power (physics); Three-phase; Distribution (mathematics); Voltage; Linear programming; Engineering; Mathematics; Mathematical optimization; Computer science; Electrical engineering; Physics; Mathematical analysis; Geometry","score_opus":0.014406977459383345,"score_gpt":0.24461668015323823,"score_spread":0.23020970269385488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2334439829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0140657555,0.00019265914,0.9689238,0.00006554514,0.008266668,0.0016636589,0.0057245363,0.0008877215,0.00020966008],"genre_scores_gemma":[0.998606,0.000011409348,0.00014828736,0.0000055495125,0.000064550935,0.00063080137,0.0001717866,0.00009406218,0.00026752157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979204,0.000045152403,0.00068246265,0.00040666622,0.00037846668,0.0005668769],"domain_scores_gemma":[0.99875313,0.0001658714,0.00009931227,0.0005328587,0.00025218356,0.00019662986],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003322089,0.00039185592,0.00039455504,0.00015521982,0.00021500539,0.000108816006,0.00018390472,0.00031092114,0.00005166745],"category_scores_gemma":[0.000015020196,0.00031954327,0.00025217776,0.00028668885,0.000029562108,0.0005633566,0.000001076586,0.0001701016,0.0002972685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00087431626,0.0008663531,0.000031572254,0.0006703475,0.00071687746,0.000014482047,0.0003074586,0.93130285,0.0382052,0.0039437846,0.01631195,0.006754797],"study_design_scores_gemma":[0.003905766,0.0008823014,0.000049111826,0.00045590743,0.000110637615,0.000041708747,0.0000731406,0.9436792,0.008520649,0.000028514061,0.041534346,0.00071871764],"about_ca_topic_score_codex":0.000023839824,"about_ca_topic_score_gemma":0.00001565214,"teacher_disagreement_score":0.9845403,"about_ca_system_score_codex":0.00066541595,"about_ca_system_score_gemma":0.000035707475,"threshold_uncertainty_score":0.9999257},"labels":[],"label_agreement":null},{"id":"W2335956429","doi":"10.1109/tpwrs.2015.2456037","title":"Delay-Dependent Stability Control for Power System With Multiple Time-Delays","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":143,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"China Scholarship Council; University of Science and Technology of China; University of Electronic Science and Technology of China; Chongqing University of Science and Technology; National Natural Science Foundation of China; University of Alberta","keywords":"Electric power system; Control theory (sociology); Controller (irrigation); Stability (learning theory); Linear matrix inequality; Computer science; Power (physics); Control system; Control (management); Control engineering; Mathematics; Engineering; Mathematical optimization","score_opus":0.014520130233473072,"score_gpt":0.20128401597140516,"score_spread":0.1867638857379321,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335956429","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008924246,0.00017743402,0.9776354,0.000023670511,0.004030735,0.0025081583,0.00088575843,0.0013122713,0.004502353],"genre_scores_gemma":[0.9983096,0.0000011396661,0.0003579452,0.000019331546,0.000012340812,0.00079704105,0.0000096460935,0.000115280396,0.00037763963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973578,0.00021387685,0.0007841105,0.0005309602,0.00057103287,0.0005422235],"domain_scores_gemma":[0.99782306,0.00027379784,0.000112363465,0.0008585279,0.00048690088,0.00044533616],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00095087953,0.00045061036,0.0006765276,0.00016849382,0.00017098467,0.00013995243,0.0002626251,0.00024621468,0.00006620089],"category_scores_gemma":[0.000015519412,0.00038733718,0.00019208544,0.00026112425,0.000058493126,0.00029862262,0.0000010884557,0.00025102642,0.00022646615],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005770079,0.00023056632,0.00018643936,0.00036700504,0.0003435411,0.000010305801,0.0011957212,0.99560666,0.0003908892,0.00009654486,0.00097442453,0.000020867164],"study_design_scores_gemma":[0.006533124,0.0007623341,0.000033243265,0.0002018229,0.00012328943,0.00014023535,0.002858276,0.98186415,0.0018723956,0.0000017225394,0.0047825393,0.000826868],"about_ca_topic_score_codex":0.00009125812,"about_ca_topic_score_gemma":0.00009540745,"teacher_disagreement_score":0.98938537,"about_ca_system_score_codex":0.0007925339,"about_ca_system_score_gemma":0.00011536757,"threshold_uncertainty_score":0.99985784},"labels":[],"label_agreement":null},{"id":"W2337458972","doi":"10.1109/tpwrs.2015.2452212","title":"A Dynamic Coherency Identification Method Based on Frequency Deviation Signals","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Electric power system; Generator (circuit theory); Computer science; Frequency domain; Identification (biology); Time domain; Noise (video); Control theory (sociology); Time–frequency analysis; Electronic engineering; Power (physics); Control engineering; Engineering; Control (management); Artificial intelligence; Telecommunications","score_opus":0.02058363973290185,"score_gpt":0.2641522313988971,"score_spread":0.24356859166599526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2337458972","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012615292,0.00011618423,0.98562104,0.00005536754,0.004521238,0.00078816444,0.000116022704,0.0006844857,0.0068359505],"genre_scores_gemma":[0.9973949,0.0000039213537,0.0017439948,0.000037840084,0.0000047577373,0.0002900689,0.00002060193,0.000054184024,0.00044970482],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99787337,0.00034458388,0.00067718927,0.00035682783,0.00049261196,0.0002554308],"domain_scores_gemma":[0.9987062,0.00013795437,0.000112393274,0.0006069803,0.00023454787,0.0002019213],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009154529,0.00026723722,0.00030997946,0.0003189118,0.000103036495,0.0001259646,0.0001851226,0.00018641807,0.00013359399],"category_scores_gemma":[0.000020501035,0.00026916855,0.00012217514,0.0004874788,0.000018589913,0.0002471991,3.6511702e-7,0.0002160649,0.00036105106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019205941,0.00011814805,0.000018453924,0.000080201506,0.000038608636,0.0000017418836,0.00042471135,0.9973291,0.0012997765,0.0000827605,0.00036200328,0.00022527837],"study_design_scores_gemma":[0.0005856527,0.00012775192,0.00010381816,0.00009836265,0.000031183725,0.000006324267,0.00022117858,0.9958227,0.0019245024,0.000038573653,0.0007394029,0.00030050322],"about_ca_topic_score_codex":0.000058946654,"about_ca_topic_score_gemma":0.000042100215,"teacher_disagreement_score":0.9961334,"about_ca_system_score_codex":0.0005392927,"about_ca_system_score_gemma":0.0000865323,"threshold_uncertainty_score":0.99997604},"labels":[],"label_agreement":null},{"id":"W2339267136","doi":"10.1109/tpwrs.2015.2442653","title":"Frequency Scan-Based Screening Method for Device Dependent Sub-Synchronous Oscillations","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba; Emergent BioSolutions (Canada)","funders":"","keywords":"Radio frequency; Sensitivity (control systems); Generator (circuit theory); Electronic engineering; Control theory (sociology); Computer science; Engineering; Physics; Power (physics); Telecommunications","score_opus":0.029559716538230852,"score_gpt":0.2723274265741644,"score_spread":0.24276771003593356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2339267136","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004868587,0.0004633127,0.980888,0.000036794638,0.009395622,0.0013489585,0.00023429775,0.0011648323,0.0015995628],"genre_scores_gemma":[0.98751163,0.000002586645,0.01120971,0.00002860733,0.000076985714,0.00079716777,0.000010204922,0.00013576166,0.0002273601],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976707,0.0001805652,0.0006708003,0.00044855644,0.0005060676,0.00052328967],"domain_scores_gemma":[0.9983984,0.00027465977,0.0001129471,0.000596994,0.0002875815,0.00032940885],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000825967,0.0003871306,0.00043438582,0.00047867448,0.00024248705,0.0001432949,0.00023715508,0.00027512922,0.000015034479],"category_scores_gemma":[0.00001967651,0.0004211684,0.00021094747,0.0004847538,0.00002368956,0.00030764355,7.5708346e-7,0.00030456734,0.00015251894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037351947,0.0000662766,0.000037040252,0.00018904217,0.00020456067,0.0000053870535,0.00043594275,0.98160505,0.0134408455,0.000033359607,0.0009993989,0.002945737],"study_design_scores_gemma":[0.0023357463,0.0003719728,0.000046202087,0.00032335156,0.00017363077,0.00014038329,0.00059398555,0.9094046,0.068114385,0.000022837256,0.017548256,0.0009246641],"about_ca_topic_score_codex":0.0006251288,"about_ca_topic_score_gemma":0.0006457583,"teacher_disagreement_score":0.982643,"about_ca_system_score_codex":0.0007733777,"about_ca_system_score_gemma":0.00014700212,"threshold_uncertainty_score":0.999824},"labels":[],"label_agreement":null},{"id":"W2339804085","doi":"10.1109/tpwrs.2015.2437372","title":"Robust Power System Stabilizer Design Using Eigenstructure Assignment","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Manitoba Hydro","keywords":"Control theory (sociology); Phasor; Electric power system; Nonlinear system; Controller (irrigation); Eigenvalues and eigenvectors; Engineering; MATLAB; Robust control; Control engineering; Flexibility (engineering); Power (physics); Computer science; Control system; Mathematics; Control (management)","score_opus":0.06369028299540895,"score_gpt":0.2252342804595171,"score_spread":0.16154399746410814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2339804085","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004546495,0.00037084674,0.97626543,0.000009607254,0.011959401,0.0011025851,0.000106888394,0.0010735128,0.004565226],"genre_scores_gemma":[0.9967837,0.0000033003766,0.002744251,0.000014655567,0.000014496484,0.000099388584,0.0000026123214,0.000112485344,0.00022515115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971151,0.0003778524,0.0007925224,0.00048043433,0.00069962477,0.00053447107],"domain_scores_gemma":[0.9983046,0.00008255282,0.00010475482,0.0008125171,0.00024352521,0.0004520527],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007704364,0.0004725584,0.000565149,0.00025011835,0.0001797073,0.0001833907,0.0002629897,0.00031243326,0.00013440526],"category_scores_gemma":[0.0000072274047,0.00043888512,0.00017321362,0.00045336163,0.000054639673,0.00030160145,0.0000017879461,0.00033404317,0.00013807167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039894265,0.000055105615,0.000015865013,0.00013271878,0.00012263302,0.000013008289,0.00128896,0.9969522,0.00054291735,0.0000711537,0.00075110066,0.000014465886],"study_design_scores_gemma":[0.0013263606,0.00021054325,0.000013764031,0.000291238,0.00009289917,0.0002485708,0.0067718737,0.9824806,0.0040194965,0.00000375349,0.0036682452,0.0008726541],"about_ca_topic_score_codex":0.000048565824,"about_ca_topic_score_gemma":0.000006937936,"teacher_disagreement_score":0.99223715,"about_ca_system_score_codex":0.0014166185,"about_ca_system_score_gemma":0.000138091,"threshold_uncertainty_score":0.9998063},"labels":[],"label_agreement":null},{"id":"W2340152469","doi":"10.1109/tpwrs.2015.2457428","title":"Model Predictive Control of Aggregated Heterogeneous Second-Order Thermostatically Controlled Loads for Ancillary Services","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":158,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Model predictive control; Control theory (sociology); Population; Smart grid; Grid; Controller (irrigation); Computer science; Control (management); Control engineering; Mathematical optimization; Engineering; Mathematics","score_opus":0.013223003513252243,"score_gpt":0.21021404129947377,"score_spread":0.1969910377862215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2340152469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03073895,0.0005593574,0.96246094,0.000024603924,0.002197779,0.0015637364,0.00040243988,0.00034670523,0.0017055055],"genre_scores_gemma":[0.9983073,0.000014094059,0.00032797322,0.00008438392,0.000021760463,0.0007449602,0.000008143277,0.00008111548,0.00041028476],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984506,0.000057966772,0.0005759278,0.00025356558,0.00033192162,0.00033004303],"domain_scores_gemma":[0.9988558,0.0001411396,0.0001032643,0.00038415648,0.0003506199,0.0001649811],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027212195,0.00029183316,0.0005999231,0.00016521978,0.000050499562,0.000037206384,0.00019627492,0.00014388599,0.000020426089],"category_scores_gemma":[0.000004465382,0.00026490047,0.00016933872,0.00016606553,0.00003602081,0.00013646945,0.0000010487815,0.000118159485,0.0000143757625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007950297,0.00009579045,0.0000028887614,0.00020853114,0.00097197463,0.0000042804622,0.0005075491,0.995671,0.001352369,0.000049591945,0.0002878384,0.000053158772],"study_design_scores_gemma":[0.007858271,0.00034954803,0.0000029971668,0.00008800399,0.00017020966,0.000008667564,0.00024371842,0.987268,0.0029644344,0.000027615666,0.0007840516,0.00023453067],"about_ca_topic_score_codex":0.000022184773,"about_ca_topic_score_gemma":0.000052232524,"teacher_disagreement_score":0.96756834,"about_ca_system_score_codex":0.0001446982,"about_ca_system_score_gemma":0.00005256432,"threshold_uncertainty_score":0.99998033},"labels":[],"label_agreement":null},{"id":"W2340306861","doi":"10.1109/tpwrs.2015.2456154","title":"Optimum Reconfiguration of Droop-Controlled Islanded Microgrids","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; York University","funders":"","keywords":"Microgrid; Voltage droop; Unavailability; Control reconfiguration; Mathematical optimization; Sorting; Controller (irrigation); Computer science; Optimization problem; Engineering; Control theory (sociology); Reliability engineering; Control engineering; Renewable energy; Voltage; Control (management); Voltage regulator; Embedded system; Electrical engineering","score_opus":0.011598938851389127,"score_gpt":0.19890262584898777,"score_spread":0.18730368699759864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2340306861","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008468127,0.0012173186,0.9795091,0.000034652825,0.004228832,0.00068232295,0.000046120185,0.00030394245,0.0055095972],"genre_scores_gemma":[0.99890584,0.00008937544,0.00025876917,0.000012925283,0.000029747167,0.00010689279,0.000007757062,0.00003614258,0.0005525608],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988736,0.00006237616,0.000510196,0.00016293772,0.00019301863,0.00019787191],"domain_scores_gemma":[0.9993465,0.000044679924,0.00008150563,0.00025842027,0.00016408358,0.00010481016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024508845,0.00018940549,0.0004101589,0.00019667916,0.000042091673,0.000051373216,0.0001099396,0.00014028167,0.000057240988],"category_scores_gemma":[0.0000040827085,0.0001741362,0.00013880497,0.00019642367,0.000020575471,0.00016948691,2.8131342e-7,0.00013864938,0.00007183821],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002628339,0.00008517529,0.0000033785414,0.000043544245,0.00019598659,0.0000020470984,0.00058514497,0.98497236,0.011102876,0.000020493266,0.0015251191,0.0012010474],"study_design_scores_gemma":[0.010813203,0.0003857838,0.00001322274,0.0001295912,0.00014861346,0.000041762025,0.00053003704,0.94860333,0.033192467,0.00001674254,0.0056540607,0.00047120376],"about_ca_topic_score_codex":0.000035192283,"about_ca_topic_score_gemma":0.00001459127,"teacher_disagreement_score":0.9904377,"about_ca_system_score_codex":0.00008499062,"about_ca_system_score_gemma":0.000037124275,"threshold_uncertainty_score":0.71010685},"labels":[],"label_agreement":null},{"id":"W2341002964","doi":"10.1109/tpwrs.2016.2543726","title":"Semidefinite Relaxation of Optimal Power Flow for AC–DC Grids","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":89,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Converters; Mathematical optimization; Relaxation (psychology); AC power; Convexity; Control theory (sociology); Power (physics); Electric power system; Power flow; Voltage; Mathematics; Computer science; Topology (electrical circuits); Engineering; Electrical engineering; Physics","score_opus":0.01027480416760361,"score_gpt":0.2119854245502425,"score_spread":0.20171062038263887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2341002964","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02845792,0.00017690097,0.9631062,0.000058226902,0.004890553,0.0005991365,0.0013164754,0.00038648464,0.0010081118],"genre_scores_gemma":[0.9977933,0.00003873253,0.0012684157,0.000008288741,0.00002482656,0.00019700915,0.00001729123,0.0000730489,0.0005790432],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984701,0.00003911117,0.0005659812,0.00028215628,0.00028229627,0.00036034037],"domain_scores_gemma":[0.9989905,0.00019292788,0.00009924913,0.00042565409,0.00018255471,0.00010914585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026248937,0.00026661396,0.00032642466,0.00020073484,0.00008198225,0.000034001496,0.0001613608,0.00022962969,0.00010758609],"category_scores_gemma":[0.000015585883,0.00022290257,0.00022086597,0.00023784446,0.000050345123,0.00035885358,8.9806326e-7,0.00013909028,0.00015878023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003988075,0.00031254053,0.000034583387,0.00041469635,0.00051923003,0.0000052666605,0.0008070773,0.82076097,0.1634143,0.0012135349,0.009680228,0.0024387408],"study_design_scores_gemma":[0.01036076,0.0040401076,0.00088145,0.002770507,0.00055533403,0.00015740606,0.0008998719,0.35367498,0.5340753,0.00013803302,0.089185126,0.0032610814],"about_ca_topic_score_codex":0.000009094657,"about_ca_topic_score_gemma":0.0000036126976,"teacher_disagreement_score":0.96933544,"about_ca_system_score_codex":0.00024249694,"about_ca_system_score_gemma":0.000030246036,"threshold_uncertainty_score":0.9089703},"labels":[],"label_agreement":null},{"id":"W2341910059","doi":"10.1109/tpwrs.2015.2438322","title":"A Novel Wavelet-Based Ensemble Method for Short-Term Load Forecasting with Hybrid Neural Networks and Feature Selection","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":226,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Taiyuan University of Technology; University of Saskatchewan","keywords":"Extreme learning machine; Artificial neural network; Computer science; Feature selection; Ensemble learning; Artificial intelligence; Ensemble forecasting; Machine learning; Feature (linguistics); Wavelet; Wavelet transform; Term (time); Data mining","score_opus":0.027361881201614518,"score_gpt":0.23532289711346455,"score_spread":0.20796101591185004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2341910059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021640554,0.00024876077,0.9748194,0.00002108993,0.0019269169,0.00044400097,0.00004087422,0.00038523728,0.00047313015],"genre_scores_gemma":[0.98362947,0.0000022997015,0.015762508,0.000028812701,0.000091091344,0.00017096255,0.000009894373,0.000098051496,0.00020689517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986954,0.00003842872,0.00026083898,0.00033124143,0.0002389618,0.00043515844],"domain_scores_gemma":[0.9992273,0.00017459305,0.000049919177,0.00017915055,0.00016442123,0.00020465131],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033856547,0.0003243207,0.00032291305,0.00013657902,0.00018236083,0.00012698413,0.00008508766,0.00014735655,0.000001907256],"category_scores_gemma":[0.0000054054844,0.00028843683,0.00008657173,0.00024559436,0.000022148099,0.00018539828,7.460793e-7,0.00033761343,7.132565e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014307036,0.000033211123,0.000020404132,0.000104486244,0.000093134084,0.000006737609,0.00017927225,0.9904041,0.0025233005,0.000010724423,0.00035039565,0.0061311373],"study_design_scores_gemma":[0.0010569574,0.00037685785,0.000008060791,0.00019496187,0.00007337019,0.00051025767,0.00006866475,0.9900423,0.0061398307,0.0000011892137,0.0011821099,0.00034540935],"about_ca_topic_score_codex":0.000055591532,"about_ca_topic_score_gemma":0.00020377287,"teacher_disagreement_score":0.9619889,"about_ca_system_score_codex":0.00017569767,"about_ca_system_score_gemma":0.000049646962,"threshold_uncertainty_score":0.9999568},"labels":[],"label_agreement":null},{"id":"W2342715674","doi":"10.1109/tpwrs.2015.2514240","title":"Frequency Control Support of a Doubly-Fed Induction Generator Based on the Torque Limit","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":176,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Control theory (sociology); Induction generator; Torque; Automatic frequency control; Decoupling (probability); Wind power; Frequency deviation; Maximum power point tracking; Maximum power principle; Limit (mathematics); Rotor (electric); Power (physics); Engineering; Computer science; Mathematics; Physics; Control engineering; Inverter; Electrical engineering; Control (management)","score_opus":0.011314056421209443,"score_gpt":0.18978084150288668,"score_spread":0.17846678508167724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2342715674","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07339697,0.00012226119,0.9080714,0.0009378048,0.010619834,0.001600493,0.00035233126,0.00052098074,0.004377911],"genre_scores_gemma":[0.9987194,0.000004214877,0.000017233931,0.00010787963,0.00013071165,0.00038429463,0.0000013384247,0.00007875747,0.0005561926],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99806684,0.00019800912,0.00064929744,0.0002948114,0.00043977945,0.00035127433],"domain_scores_gemma":[0.9985208,0.00031635226,0.00012992557,0.0007629385,0.00014681094,0.0001231801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044013496,0.00031972557,0.0004381224,0.0002415475,0.00009746656,0.000046823767,0.00026023886,0.00022102355,0.00027772505],"category_scores_gemma":[0.0000131584175,0.00019384154,0.00022496689,0.00025227582,0.000054317272,0.00017364816,3.9129037e-7,0.00023840644,0.0002476828],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037135783,0.00043976767,0.00023708254,0.00028731127,0.00094862457,0.000029256504,0.0005665374,0.26405478,0.7177349,0.0013932694,0.012836569,0.0011005605],"study_design_scores_gemma":[0.035157274,0.006108074,0.0018485623,0.0033877748,0.0010133891,0.00029706626,0.0005810938,0.31975597,0.55996144,0.000106660176,0.06700732,0.0047753938],"about_ca_topic_score_codex":0.00011328878,"about_ca_topic_score_gemma":0.00002899428,"teacher_disagreement_score":0.9253224,"about_ca_system_score_codex":0.000256807,"about_ca_system_score_gemma":0.000077433615,"threshold_uncertainty_score":0.79046285},"labels":[],"label_agreement":null},{"id":"W2343330772","doi":"10.1109/tpwrs.2015.2512990","title":"Energy-Centric Flexibility Management in Power Systems","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; Group for Research in Decision Analysis","funders":"","keywords":"Flexibility (engineering); Electric power system; Renewable energy; Energy storage; Reliability engineering; Computer science; Exploit; Demand response; Electricity generation; Energy management; Power management; Power (physics); Risk analysis (engineering); Environmental economics; Engineering; Energy (signal processing); Business; Electrical engineering; Economics; Electricity; Computer security","score_opus":0.008500344302315548,"score_gpt":0.20198371306668708,"score_spread":0.19348336876437153,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343330772","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029042433,0.0009241939,0.97027844,0.000031435975,0.008458327,0.0008448754,0.000048582864,0.0007807853,0.015729144],"genre_scores_gemma":[0.99521965,0.00021656264,0.000060022398,0.000014847623,0.000012234453,0.00042621922,0.0000020642383,0.00009960338,0.003948799],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971492,0.00020821593,0.0008917647,0.0005568192,0.00052923715,0.0006647545],"domain_scores_gemma":[0.998667,0.0001268501,0.00009556486,0.0008527036,0.00008239375,0.00017547751],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046047408,0.00041083677,0.00047252257,0.00078209187,0.00008322823,0.00010055605,0.00031813586,0.00024266762,0.0000852419],"category_scores_gemma":[0.0000028334744,0.00033743872,0.00013668874,0.0010356421,0.000030161003,0.00034454186,0.0000019783101,0.0001802321,0.0002634385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000117253396,0.0005373215,0.00013960192,0.00056776166,0.0006077925,0.00012724339,0.00048283557,0.98463476,0.0017914091,0.0035051866,0.004772692,0.002716125],"study_design_scores_gemma":[0.016709913,0.0013768524,0.0011404435,0.006562226,0.00046205957,0.0006388952,0.0018599592,0.7749402,0.019469148,0.00014663846,0.1698336,0.0068600676],"about_ca_topic_score_codex":0.00013584291,"about_ca_topic_score_gemma":0.000025327381,"teacher_disagreement_score":0.9923154,"about_ca_system_score_codex":0.0010789239,"about_ca_system_score_gemma":0.000027166916,"threshold_uncertainty_score":0.9999078},"labels":[],"label_agreement":null},{"id":"W2343408626","doi":"10.1109/tpwrs.2015.2507061","title":"Clustering Technique Applied to Nodal Reliability Indices for Optimal Planning of Energy Resources","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Taibah University","keywords":"Cluster analysis; Reliability (semiconductor); Computer science; Reliability engineering; Energy (signal processing); Mathematical optimization; Engineering; Power (physics); Mathematics; Artificial intelligence; Physics; Statistics","score_opus":0.008743887332442454,"score_gpt":0.21497829083315806,"score_spread":0.2062344035007156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343408626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026206408,0.00006808428,0.9692184,0.000034243363,0.0016706405,0.0008643574,0.00016227945,0.00038391555,0.001391681],"genre_scores_gemma":[0.99619037,0.0000052106416,0.00223828,0.00001596365,0.000025484178,0.0011958928,7.1338235e-7,0.000053821117,0.00027429336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983786,0.00004407644,0.0006020425,0.0003667698,0.00022583475,0.0003826946],"domain_scores_gemma":[0.9989057,0.00028110392,0.00008679089,0.0005093488,0.000081562306,0.00013549453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005191887,0.00024980292,0.00042893548,0.00024065016,0.00008957207,0.000027558934,0.00027926412,0.00019849879,0.000011060122],"category_scores_gemma":[0.000009500185,0.00019454911,0.00013893744,0.00021429856,0.00005669947,0.00012039931,0.000002878359,0.00010881592,0.000009380488],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047238838,0.00009761098,0.000019312412,0.0008612969,0.000118741395,0.0000023255718,0.0015436524,0.8996778,0.095287114,0.00015477407,0.00071492133,0.0010500643],"study_design_scores_gemma":[0.0030527783,0.0016354775,0.0003196852,0.005509258,0.00012745238,0.00009143622,0.002394894,0.025308339,0.81877494,0.000060399154,0.14064494,0.0020804002],"about_ca_topic_score_codex":0.00006155489,"about_ca_topic_score_gemma":0.0000173292,"teacher_disagreement_score":0.96998394,"about_ca_system_score_codex":0.00017453374,"about_ca_system_score_gemma":0.000020537584,"threshold_uncertainty_score":0.79334825},"labels":[],"label_agreement":null},{"id":"W2343465711","doi":"10.1109/tpwrs.2015.2501224","title":"Anomalous Stability Behavior of Synchronous Machine With High Impedance Faults","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Clearance; Fault (geology); Resistive touchscreen; Electrical impedance; Clearing; Stability (learning theory); Control theory (sociology); High impedance; Electric power system; Computer science; Engineering; Physics; Power (physics); Electrical engineering; Artificial intelligence","score_opus":0.01356990391198866,"score_gpt":0.21126154077204373,"score_spread":0.1976916368600551,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2343465711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3004467,0.00022985274,0.694975,0.0000068861796,0.0018986013,0.00062794244,0.00030161574,0.00033945605,0.0011739433],"genre_scores_gemma":[0.99919057,0.000005898942,0.00044303716,0.000004531442,0.0000047222907,0.00017492678,0.000006431439,0.000052225107,0.00011765672],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99830174,0.00011591575,0.0005741105,0.00031373638,0.00040739152,0.000287118],"domain_scores_gemma":[0.99868995,0.000055512504,0.000092492475,0.0007007811,0.00023199811,0.00022927679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032889243,0.00027969616,0.000465986,0.00012117347,0.00005889444,0.000027643899,0.00018742851,0.00013127322,0.000074964846],"category_scores_gemma":[0.0000046979844,0.00024180705,0.000086148444,0.00032286762,0.00008010146,0.00019466464,9.685643e-7,0.00020451365,0.000031894288],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038844443,0.00090201455,0.0036542248,0.0006813992,0.0002615229,0.00003632415,0.0037667225,0.98811126,0.0014685296,0.000089139736,0.00018349604,0.00045692438],"study_design_scores_gemma":[0.024790796,0.009809219,0.016742166,0.0017201283,0.0012640991,0.0013692799,0.011132489,0.7611894,0.15683542,0.000029993353,0.007964221,0.0071527557],"about_ca_topic_score_codex":0.0004428633,"about_ca_topic_score_gemma":0.00020464972,"teacher_disagreement_score":0.6987439,"about_ca_system_score_codex":0.0002926547,"about_ca_system_score_gemma":0.00008605454,"threshold_uncertainty_score":0.98606056},"labels":[],"label_agreement":null},{"id":"W2344299036","doi":"10.1109/tpwrs.2015.2504461","title":"A Sequential Power Flow Algorithm for Islanded Hybrid AC/DC Microgrids","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":113,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Robustness (evolution); Converters; Algorithm; Computer science; AC power; Power flow; Electric power system; Control theory (sociology); Voltage; Newton's method; Power (physics); Engineering; Nonlinear system; Electrical engineering","score_opus":0.012428448747020333,"score_gpt":0.211624125386284,"score_spread":0.19919567663926366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2344299036","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000893452,0.00092760136,0.98661757,0.000035428384,0.0091197835,0.0007651236,0.00049846555,0.000527742,0.00061480905],"genre_scores_gemma":[0.9925747,0.000053030555,0.005894026,0.00005183501,0.00012013927,0.0003152056,0.00004093636,0.00010133265,0.0008488218],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986754,0.00004198663,0.00038694567,0.0002807984,0.00022353846,0.00039134806],"domain_scores_gemma":[0.9992515,0.000035691173,0.000044805678,0.00031146826,0.00016819432,0.00018836565],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021189036,0.00028082702,0.00032098137,0.00017790587,0.00010264877,0.00013999899,0.0001619196,0.00013674503,0.00006150133],"category_scores_gemma":[0.000002272755,0.00027650062,0.00019564744,0.00015880962,0.000024857607,0.0002027138,8.0214664e-7,0.00018445826,0.0001268499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009871795,0.00016515354,0.0000010275434,0.000067837915,0.00041284243,0.000017317221,0.0008374052,0.95917803,0.0039160117,0.0000074730283,0.019483067,0.015815139],"study_design_scores_gemma":[0.0024669087,0.00022808235,0.0000010588975,0.000053306805,0.00008378206,0.00010154108,0.00016952223,0.9287753,0.011876302,0.000010219286,0.055816922,0.00041707075],"about_ca_topic_score_codex":0.000033819037,"about_ca_topic_score_gemma":0.00001197822,"teacher_disagreement_score":0.9916812,"about_ca_system_score_codex":0.00016665459,"about_ca_system_score_gemma":0.000052345924,"threshold_uncertainty_score":0.9999687},"labels":[],"label_agreement":null},{"id":"W2344531617","doi":"10.1109/tpwrs.2015.2505185","title":"Computation of Maximum Loading Points via the Factored Load Flow","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Escuela Superior Politécnica del Litoral; McGill University","keywords":"Computation; Robustness (evolution); Power flow; Continuation; Electric power system; Benchmark (surveying); Mathematical optimization; Exploit; Computer science; Bisection method; Maximum flow problem; Algorithm; Flow (mathematics); Power (physics); Control theory (sociology); Mathematics","score_opus":0.021202892655725496,"score_gpt":0.22735826477635923,"score_spread":0.20615537212063373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2344531617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006156137,0.00018659366,0.9847828,0.000046591766,0.0052637747,0.0004321932,0.00005263523,0.0002782761,0.0028009654],"genre_scores_gemma":[0.99950624,0.0000035086807,0.000285295,0.000012560584,0.0000065199215,0.000033415243,0.000002766418,0.000032085267,0.00011760545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998566,0.00013651242,0.0004901118,0.00017764771,0.00042817014,0.00020160245],"domain_scores_gemma":[0.9991585,0.000072351584,0.000075745425,0.00034199317,0.00022561353,0.00012580743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046578047,0.00018608588,0.00027378424,0.00010050392,0.00007630807,0.000050960352,0.00015951069,0.00010658475,0.000031272575],"category_scores_gemma":[0.000007948681,0.00014804321,0.000105382875,0.00029151252,0.000042904583,0.00016632755,8.2549445e-7,0.00016473816,0.000090377114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023626877,0.000051012637,0.000021631045,0.00008017115,0.00007458987,0.0000011792953,0.0025023161,0.995837,0.00041741,0.000011980072,0.00074454397,0.00023456024],"study_design_scores_gemma":[0.0007566271,0.00007875595,0.00006987563,0.0001032084,0.000029828552,0.000026326852,0.00096235186,0.9920369,0.0035023605,0.00003425183,0.0021539489,0.00024556683],"about_ca_topic_score_codex":0.000077631725,"about_ca_topic_score_gemma":0.00003459955,"teacher_disagreement_score":0.9933501,"about_ca_system_score_codex":0.00027505262,"about_ca_system_score_gemma":0.000052164185,"threshold_uncertainty_score":0.60370266},"labels":[],"label_agreement":null},{"id":"W2345131138","doi":"10.1109/tpwrs.2015.2507067","title":"Optimal Location and Sizing of Fault Current Limiters in Mesh Networks Using Iterative Mixed Integer Nonlinear Programming","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Integer programming; Circuit breaker; Heuristic; Fault (geology); Electrical impedance; Electric power system; Nonlinear programming; Fault current limiter; Linear programming; Sizing; Nonlinear system; Electric power transmission; Mathematical optimization; Power (physics); Iterative method; Computer science; Engineering; Algorithm; Electrical engineering; Mathematics","score_opus":0.014625231707862747,"score_gpt":0.2417509644501617,"score_spread":0.22712573274229894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2345131138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2526595,0.0003602004,0.74498713,0.0000097520715,0.0015262134,0.0003268973,0.000037005957,0.00008332306,0.000009977129],"genre_scores_gemma":[0.9988888,0.0000554543,0.00094012223,0.0000017593977,0.000019655175,0.00004905599,0.0000056771923,0.000033431174,0.0000060247585],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99879855,0.000064157975,0.00046053817,0.00023206056,0.00016117368,0.00028349838],"domain_scores_gemma":[0.99948543,0.00008239031,0.00007393804,0.00017017777,0.00011590365,0.00007215695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020182956,0.00020986344,0.0002593007,0.000214302,0.000047658752,0.000050260376,0.000074043746,0.00011668783,0.0000041945787],"category_scores_gemma":[0.00000644422,0.00017986319,0.000057896235,0.00034412512,0.000056357414,0.0003445059,0.0000014744094,0.00020579642,0.000003792301],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042568383,0.000102507074,0.00011683303,0.00017011914,0.000061762694,0.0000020853402,0.00063095614,0.98421055,0.006316537,0.000024479956,0.000015353158,0.008306247],"study_design_scores_gemma":[0.0006016539,0.00012259751,0.000090394526,0.0014386784,0.00003096094,0.00000923964,0.00032701463,0.99003136,0.00682304,4.140729e-7,0.0002736874,0.00025093937],"about_ca_topic_score_codex":0.000020831094,"about_ca_topic_score_gemma":0.000016165202,"teacher_disagreement_score":0.74622935,"about_ca_system_score_codex":0.00025690772,"about_ca_system_score_gemma":0.000019409747,"threshold_uncertainty_score":0.7334608},"labels":[],"label_agreement":null},{"id":"W2345180021","doi":"10.1109/tpwrs.2016.2516978","title":"Three-Phase Unbalanced Power Flow Using a &lt;formula formulatype=\"inline\"&gt; &lt;tex Notation=\"TeX\"&gt;$\\pi$&lt;/tex&gt; &lt;/formula&gt;-Model of Controllable AC-DC Converters","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Converters; Control theory (sociology); AC power; Power (physics); Electric power system; Three-phase; Newton's method; Computer science; Topology (electrical circuits); Engineering; Electronic engineering; Mathematics; Voltage; Electrical engineering; Nonlinear system; Physics","score_opus":0.011998522931679793,"score_gpt":0.22153913407548473,"score_spread":0.20954061114380493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2345180021","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03466332,0.0013339116,0.9553133,0.00010569899,0.003930087,0.0018783187,0.0010167565,0.0006557439,0.0011028469],"genre_scores_gemma":[0.99513406,0.00026498237,0.0030672785,0.000103628176,0.00010211858,0.00020495754,0.000055328823,0.00024916793,0.0008184963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99521905,0.000094767565,0.0017828393,0.00082983135,0.00088918133,0.0011843231],"domain_scores_gemma":[0.9970502,0.00024471647,0.0004619887,0.001138646,0.0006958335,0.00040856036],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005454458,0.0009631707,0.0013928508,0.0006810466,0.00038568542,0.00019104492,0.00053760933,0.0006127924,0.0002659784],"category_scores_gemma":[0.000026282656,0.0008179379,0.0006034279,0.0007229608,0.00013873362,0.001235961,0.0000083352,0.00037074747,0.00018721273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055496907,0.0002976312,0.0000072277203,0.00018802169,0.0005792466,0.000009749024,0.00052826,0.69424444,0.30010033,0.00042112748,0.00054615876,0.0025228502],"study_design_scores_gemma":[0.011187228,0.00036143232,0.000011667665,0.00055701385,0.00031913235,0.000044583107,0.000059080678,0.9688681,0.012688441,0.000050554856,0.004883565,0.0009691994],"about_ca_topic_score_codex":0.000051431296,"about_ca_topic_score_gemma":0.00023853805,"teacher_disagreement_score":0.96047074,"about_ca_system_score_codex":0.0006284201,"about_ca_system_score_gemma":0.00023797955,"threshold_uncertainty_score":0.99942714},"labels":[],"label_agreement":null},{"id":"W2345204546","doi":"10.1109/tpwrs.2015.2496302","title":"Post-Disturbance Transient Stability Status Prediction Using Synchrophasor Measurements","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Transient (computer programming); Disturbance (geology); Control theory (sociology); Electric power system; Voltage; Stability (learning theory); Engineering; Rotor (electric); Power (physics); Computer science; Physics; Electrical engineering","score_opus":0.0541421639350206,"score_gpt":0.24329823162647637,"score_spread":0.18915606769145576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2345204546","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10946274,0.0004820911,0.8762357,0.000012098936,0.008889502,0.00086771545,0.00060668425,0.00070362265,0.0027398076],"genre_scores_gemma":[0.99934626,0.000009209652,0.00036722777,0.00001780839,0.000009902805,0.0000969842,0.000010636205,0.000061579674,0.00008037202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99737674,0.00022922184,0.0007206187,0.0004311009,0.0007455635,0.000496779],"domain_scores_gemma":[0.9983861,0.000036571484,0.00007317035,0.0006226925,0.00044490455,0.00043655842],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00061857735,0.00034087105,0.0003915394,0.00016541903,0.00015388144,0.0001046387,0.00015636938,0.00017304206,0.000090838716],"category_scores_gemma":[0.000014433964,0.00034184533,0.00014667065,0.00037462817,0.000060342627,0.0004009058,6.157412e-7,0.00025622555,0.00005358112],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010811763,0.00026781778,0.00031270742,0.00022998202,0.00013432634,0.000004214503,0.0027988197,0.99181014,0.0040514916,0.00000499211,0.00021956037,0.000057800815],"study_design_scores_gemma":[0.003711734,0.0006544476,0.0009825571,0.00033284674,0.00019579932,0.00009691495,0.004176935,0.9641237,0.017500307,0.000003751517,0.0070431675,0.0011778171],"about_ca_topic_score_codex":0.00020596158,"about_ca_topic_score_gemma":0.000047896676,"teacher_disagreement_score":0.8898835,"about_ca_system_score_codex":0.0011956928,"about_ca_system_score_gemma":0.00014419129,"threshold_uncertainty_score":0.9999034},"labels":[],"label_agreement":null},{"id":"W2345795240","doi":"10.1109/tpwrs.2015.2473797","title":"Reliability Evaluation of a Tidal Power Generation System Considering Tidal Current Speeds","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Energy Research and Development","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; Simon Fraser University","funders":"Higher Education Discipline Innovation Project","keywords":"Tidal power; Current (fluid); Reliability (semiconductor); Rotor (electric); Failure rate; Power (physics); Engineering; Marine engineering; Physics; Reliability engineering; Electrical engineering","score_opus":0.06950452077955205,"score_gpt":0.2838949273831804,"score_spread":0.21439040660362835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2345795240","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47633243,0.0007142179,0.50738096,0.00001630383,0.008645811,0.00070503517,0.000045038993,0.0003222997,0.005837889],"genre_scores_gemma":[0.9995201,0.000008394453,0.00015728331,0.000002027812,0.000044190117,0.00015555993,0.000007605789,0.000032591848,0.00007222369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997594,0.00020772821,0.00054318423,0.00025300527,0.0011067615,0.00029529957],"domain_scores_gemma":[0.99873424,0.000039871546,0.000058182406,0.00038219956,0.0005553619,0.00023012869],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015028524,0.00020518809,0.00028057562,0.00023265029,0.00007068643,0.00005662102,0.00011001212,0.00011020165,0.00004695423],"category_scores_gemma":[0.000018861625,0.00019470498,0.000088019304,0.000258129,0.00003562312,0.00020329832,0.0000015647546,0.00021656914,0.000092792085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029806399,0.00009009537,0.000030111853,0.00015393685,0.000085457745,0.0000024217236,0.0008401172,0.9919569,0.0041923337,0.00012149581,0.0016401348,0.0008571818],"study_design_scores_gemma":[0.0024110784,0.00030825209,0.00033014943,0.00047251454,0.000105750274,0.00007446836,0.0019387668,0.9264417,0.059034076,0.000015599144,0.008226171,0.00064144214],"about_ca_topic_score_codex":0.00008283732,"about_ca_topic_score_gemma":0.000026648531,"teacher_disagreement_score":0.5231877,"about_ca_system_score_codex":0.0008050241,"about_ca_system_score_gemma":0.00026506593,"threshold_uncertainty_score":0.7939839},"labels":[],"label_agreement":null},{"id":"W2366892089","doi":"10.1109/tpwrs.2015.2478851","title":"Improved Vector Control Strategy for Current-Source Converters Connected to Very Weak Grids","year":2015,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Phase-locked loop; Control theory (sociology); Converters; Interconnection; Reference frame; Vector control; Rotating reference frame; Grid; Frame (networking); Stability (learning theory); Computer science; Engineering; Control system; AC power; Control engineering; Power (physics); Electronic engineering; Control (management); Voltage; Mathematics","score_opus":0.014594426797913122,"score_gpt":0.2202058655363674,"score_spread":0.20561143873845428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2366892089","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022124182,0.00082060363,0.98638153,0.000060568662,0.008195475,0.0013575155,0.00027389312,0.00056227157,0.00013571532],"genre_scores_gemma":[0.9989805,0.000014319973,0.00007040486,0.000042187945,0.000078241814,0.00046279922,0.000014315618,0.00006891504,0.000268287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987869,0.00004842448,0.0003736824,0.00026626248,0.00015693475,0.00036777082],"domain_scores_gemma":[0.99913055,0.00007932234,0.000045650595,0.00026730873,0.00019309629,0.0002840533],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015431267,0.00026423004,0.00034876965,0.00016876582,0.000075167336,0.00011041418,0.00014898053,0.00012352155,0.00002191077],"category_scores_gemma":[0.000007384399,0.00026327337,0.00012974146,0.00020021063,0.000017184395,0.00016028079,4.4312202e-7,0.00016957568,0.00007325021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002671333,0.000066379376,0.000001992429,0.00008798188,0.00017921362,9.779302e-7,0.00037796877,0.9841183,0.00604186,0.000019037785,0.0047926637,0.0040465235],"study_design_scores_gemma":[0.00412097,0.00043339533,0.000006363059,0.00007121398,0.000090701535,0.000014458159,0.00036240483,0.9540656,0.001566946,0.0000015930552,0.038869843,0.0003965139],"about_ca_topic_score_codex":0.00005664983,"about_ca_topic_score_gemma":0.000030179477,"teacher_disagreement_score":0.9967681,"about_ca_system_score_codex":0.00016385595,"about_ca_system_score_gemma":0.000056634537,"threshold_uncertainty_score":0.99998194},"labels":[],"label_agreement":null},{"id":"W2409882009","doi":"10.1109/tpwrs.2016.2576901","title":"An Enhanced DC Voltage Droop-Control for the VSC--HVDC Grid","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"National High-tech Research and Development Program; Program for New Century Excellent Talents in University; National Natural Science Foundation of China","keywords":"Voltage droop; Voltage source; High-voltage direct current; Control theory (sociology); Grid; Modular design; Engineering; Voltage; AC power; Transient (computer programming); Electronic engineering; Computer science; Direct current; Electrical engineering; Control (management); Mathematics","score_opus":0.007700320929386151,"score_gpt":0.21766331066925948,"score_spread":0.20996298973987332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2409882009","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0063219215,0.00019758221,0.9795368,0.00006605229,0.011079427,0.0015637407,0.00020824342,0.00057549303,0.00045075876],"genre_scores_gemma":[0.9968718,0.0000243691,0.000025664207,0.000023233615,0.00023026246,0.001531863,0.0000010062687,0.000076726115,0.001215042],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986578,0.000059286464,0.00040519648,0.00028688952,0.00022192976,0.0003688842],"domain_scores_gemma":[0.9989225,0.0002284274,0.00005936249,0.00058601925,0.000089648296,0.00011403503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003896784,0.00024912955,0.00027452194,0.00011398586,0.000270023,0.00009300183,0.00022827905,0.00017733192,0.00005935314],"category_scores_gemma":[0.0000050071744,0.00014904105,0.00017631981,0.00015368812,0.000032505166,0.00029923904,2.6960095e-7,0.00015771492,0.00016246884],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021175625,0.00014839249,0.000005602858,0.00023172563,0.00051714276,0.000003222755,0.0012219098,0.15341571,0.8216127,0.00026096348,0.0020910266,0.020279832],"study_design_scores_gemma":[0.00989539,0.0020247053,0.0002648143,0.0010615155,0.00034730174,0.00012662236,0.0017189056,0.244499,0.44745043,0.00007195246,0.29043472,0.002104627],"about_ca_topic_score_codex":0.00011962946,"about_ca_topic_score_gemma":0.000086914646,"teacher_disagreement_score":0.9905499,"about_ca_system_score_codex":0.00014339773,"about_ca_system_score_gemma":0.000017786246,"threshold_uncertainty_score":0.60777175},"labels":[],"label_agreement":null},{"id":"W2484703896","doi":"10.1109/tpwrs.2016.2597338","title":"A Robust Linear Approach for Offering Strategy of a Hybrid Electric Energy Company","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Bilevel optimization; Mathematical optimization; Maximization; Duality (order theory); Computer science; Electricity market; Linear programming; Strong duality; Robust optimization; Energy management; Electricity; Energy (signal processing); Optimization problem; Economics; Engineering; Mathematics; Microeconomics","score_opus":0.019455812730681202,"score_gpt":0.19889421368284552,"score_spread":0.17943840095216432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2484703896","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034128511,0.00035927843,0.9926971,0.0000053748604,0.001057102,0.00055288465,0.00008477947,0.0003990818,0.0014315319],"genre_scores_gemma":[0.9975885,0.00005982465,0.0012766827,0.0000040333966,0.000029533456,0.00033408834,0.000004896469,0.00009660336,0.00060585124],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983546,0.00006450006,0.0006021909,0.00030758025,0.00025349265,0.0004175941],"domain_scores_gemma":[0.9991112,0.00014623892,0.00010922106,0.0003896982,0.0001406737,0.00010300446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019892116,0.00027908597,0.00045006615,0.0004043377,0.000072220064,0.000028020333,0.00021089235,0.000107386215,0.000012760428],"category_scores_gemma":[0.000003976669,0.0002306339,0.00016402784,0.00046403115,0.00001902086,0.0001820384,5.7800463e-7,0.00010410183,0.000007196556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044919758,0.00010103996,0.0000019099423,0.00021990253,0.00017871908,0.0000014463816,0.000043902728,0.97007966,0.02769429,0.00019145642,0.0003714529,0.0010713178],"study_design_scores_gemma":[0.000931886,0.0002590632,0.000004095652,0.00015332577,0.000050205028,0.00006701355,0.000031904947,0.87596655,0.12156081,0.0000041976373,0.0006447201,0.00032623968],"about_ca_topic_score_codex":0.000048557755,"about_ca_topic_score_gemma":0.0000035765584,"teacher_disagreement_score":0.9941756,"about_ca_system_score_codex":0.00020962804,"about_ca_system_score_gemma":0.000048958456,"threshold_uncertainty_score":0.94049776},"labels":[],"label_agreement":null},{"id":"W2521115153","doi":"10.1109/tpwrs.2016.2611603","title":"A Guaranteed and Efficient Method to Enforce Passivity of Frequency-Dependent Network Equivalents","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"National Natural Science Foundation of China","keywords":"Passivity; Control theory (sociology); Frequency domain; Lemma (botany); Computer science; Stability (learning theory); Frequency response; Partition (number theory); Mathematical optimization; Mathematics; Engineering; Control (management)","score_opus":0.009145033711693543,"score_gpt":0.2355755930190868,"score_spread":0.22643055930739325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2521115153","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03025873,0.00016484172,0.96377283,0.00003114075,0.0020992819,0.00067161856,0.00006659573,0.00019806194,0.002736877],"genre_scores_gemma":[0.99890405,0.000007290388,0.0002963467,0.000018381099,0.000028464736,0.00009975327,2.7759071e-7,0.00003742497,0.0006080283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838215,0.00015500298,0.0005353628,0.00026144375,0.00034278777,0.00032326355],"domain_scores_gemma":[0.99910384,0.0002174595,0.00007752548,0.0003656626,0.000071012284,0.0001644932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005023875,0.00021862761,0.00040238383,0.0001540526,0.00007159676,0.000039517978,0.00013249848,0.00011569694,0.00005986951],"category_scores_gemma":[0.0000043644604,0.00016225406,0.00010919303,0.00020996935,0.000020698195,0.00007897902,0.0000013321398,0.00009131528,0.000075255884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054951717,0.000042689564,0.00007529874,0.00009592895,0.00013289302,0.0000032060643,0.00035346014,0.9501491,0.04568037,0.00035239977,0.0001228445,0.0029368114],"study_design_scores_gemma":[0.010299186,0.0012339123,0.0029401144,0.0038678036,0.00035903376,0.00020523122,0.00084701023,0.9193454,0.04998151,0.00012687618,0.008451506,0.00234243],"about_ca_topic_score_codex":0.00015349606,"about_ca_topic_score_gemma":0.00001853894,"teacher_disagreement_score":0.9686453,"about_ca_system_score_codex":0.00010944054,"about_ca_system_score_gemma":0.000016626007,"threshold_uncertainty_score":0.66165286},"labels":[],"label_agreement":null},{"id":"W2529726785","doi":"10.1109/tpwrs.2016.2615688","title":"Alternative LP and SOCP Hierarchies for ACOPF Problems","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; University of Waterloo","funders":"","keywords":"Mathematical optimization; AC power; Conic section; Linear programming; Semidefinite programming; Grid; Hierarchy; Power flow; Computer science; Second-order cone programming; Network topology; Electric power system; Mathematics; Voltage; Power (physics); Convex optimization; Engineering","score_opus":0.012017018836261982,"score_gpt":0.21580686407218072,"score_spread":0.20378984523591873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2529726785","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022236142,0.00021280603,0.97258735,0.00010104544,0.002591458,0.0006495432,0.0006432025,0.00032794088,0.00065048673],"genre_scores_gemma":[0.99870485,0.00007555135,0.00017565407,0.000008370188,0.000028173321,0.00032776786,0.0000034181926,0.000043707514,0.00063253124],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990996,0.000024255927,0.00023863366,0.00022322351,0.00014030005,0.00027395025],"domain_scores_gemma":[0.9995021,0.0001283373,0.000031070078,0.0001871451,0.000060155755,0.000091180504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011883418,0.00018946567,0.00019205145,0.000115577415,0.00010020353,0.00005514076,0.00009407493,0.00008941403,0.000021044445],"category_scores_gemma":[0.0000035624632,0.0001453555,0.000074411095,0.00008943114,0.000057676443,0.00024501086,6.4996846e-7,0.00009480792,0.000056580793],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006566905,0.0008325702,0.00015099587,0.0027394777,0.0027081612,0.000024757725,0.0076427576,0.55719084,0.3487871,0.01020168,0.024930377,0.044134587],"study_design_scores_gemma":[0.016678503,0.0047559603,0.000643932,0.004194429,0.0005116612,0.00030851937,0.001426464,0.30811584,0.4005298,0.0030459594,0.25479233,0.0049966155],"about_ca_topic_score_codex":0.000020464562,"about_ca_topic_score_gemma":0.000011668781,"teacher_disagreement_score":0.9764687,"about_ca_system_score_codex":0.00012905081,"about_ca_system_score_gemma":0.000011397244,"threshold_uncertainty_score":0.59274256},"labels":[],"label_agreement":null},{"id":"W2534086918","doi":"10.1109/tpwrs.2016.2618391","title":"Analysis and Damping of Mechanical Resonance of Wind Power Generators Contributing to Frequency Regulation","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Voltage droop; Wind power; Control theory (sociology); Electric power system; Induction generator; Generator (circuit theory); Engineering; Mechanical resonance; Automatic frequency control; Frequency domain; Power (physics); Computer science; Physics; Vibration; Electrical engineering; Voltage regulator; Voltage; Acoustics; Control (management)","score_opus":0.006340862973944574,"score_gpt":0.2006203933633284,"score_spread":0.19427953038938384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2534086918","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34301087,0.00033966472,0.6552447,0.000032679505,0.00076429476,0.00028368726,0.000112339396,0.000069537055,0.00014219587],"genre_scores_gemma":[0.9996732,0.000007427496,0.00017270817,0.000006138498,0.00001855928,0.000023707062,8.1873765e-7,0.000030524883,0.00006694008],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99833333,0.00009441863,0.00072432205,0.00026540447,0.00029174672,0.00029076464],"domain_scores_gemma":[0.99901825,0.00016952312,0.00013333398,0.0004026791,0.00016405681,0.00011215721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049176713,0.00018846689,0.00057545415,0.00041822257,0.000058123864,0.000017731732,0.000116418014,0.00014207565,0.000029918372],"category_scores_gemma":[0.000020966349,0.00015233735,0.0001491629,0.00067072496,0.000025789466,0.00014449259,0.0000015045322,0.000084310544,0.0000068125682],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007119751,0.00006594215,0.0032146175,0.00017222992,0.0013592376,0.000004321682,0.00064243283,0.11493525,0.87732255,0.0008843741,0.00006802948,0.0012597935],"study_design_scores_gemma":[0.0057335673,0.0009850549,0.048302107,0.003267424,0.0015132889,0.000053758216,0.000512471,0.07390307,0.86204505,0.000097039876,0.0017548925,0.0018323066],"about_ca_topic_score_codex":0.00010647802,"about_ca_topic_score_gemma":0.000042413056,"teacher_disagreement_score":0.6566623,"about_ca_system_score_codex":0.000111216475,"about_ca_system_score_gemma":0.000017599572,"threshold_uncertainty_score":0.6212137},"labels":[],"label_agreement":null},{"id":"W2546962238","doi":"","title":"Power Divider","year":2016,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"AC power; Electric power transmission; Current divider; Topology (electrical circuits); Power dividers and directional couplers; Voltage; Volt-ampere reactive; Electrical engineering; Transmission line; Power (physics); Wilkinson power divider; Electrical network; Engineering; Computer science; Power-flow study; Voltage divider; Frequency divider; Physics","score_opus":0.007978858323838314,"score_gpt":0.20051505584536553,"score_spread":0.1925361975215272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2546962238","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021924138,0.00014848435,0.9606711,0.00011594484,0.006943097,0.00026401636,0.0002789033,0.000850306,0.008803961],"genre_scores_gemma":[0.9982069,0.00001970715,0.00003860939,0.00002275476,0.00001719858,0.000077954246,0.0000017470014,0.00006136995,0.0015537692],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987501,0.000035936464,0.0003140367,0.00024827002,0.00027509898,0.00037654236],"domain_scores_gemma":[0.9992562,0.00007687947,0.00002746976,0.0004364462,0.000061043014,0.00014195571],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012605211,0.00023919549,0.00021044801,0.00013149761,0.00008297398,0.00005706845,0.000160299,0.00015091129,0.0005896285],"category_scores_gemma":[0.00000349066,0.00018149671,0.00013051557,0.00019141778,0.0000412078,0.0002989944,6.247747e-7,0.00015103655,0.002140857],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004074899,0.0014893566,0.00041246568,0.00056284363,0.0023582038,0.00020338486,0.0024801195,0.35888556,0.38236067,0.0049894643,0.23294745,0.0129029825],"study_design_scores_gemma":[0.0072629964,0.0018028739,0.0025738694,0.001945879,0.0002598954,0.000404554,0.00077000284,0.018495705,0.23995414,0.00016391315,0.72156334,0.00480283],"about_ca_topic_score_codex":0.000010373114,"about_ca_topic_score_gemma":0.0000041062704,"teacher_disagreement_score":0.9762828,"about_ca_system_score_codex":0.000238106,"about_ca_system_score_gemma":0.000014468434,"threshold_uncertainty_score":0.99863607},"labels":[],"label_agreement":null},{"id":"W2578013480","doi":"10.1109/tpwrs.2017.2654346","title":"Enhanced Generic Nonlinear and Linearized Models of Wind Power Plants","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Control theory (sociology); Nonlinear system; Electric power system; Wind power; MATLAB; AC power; Control engineering; Computer science; Controller (irrigation); Power (physics); Engineering; Voltage; Control (management)","score_opus":0.015840451370031743,"score_gpt":0.2177963638605622,"score_spread":0.20195591249053046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2578013480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33298904,0.0005881549,0.65546745,0.000019722309,0.0046708216,0.00061118655,0.00021082586,0.00021442343,0.005228355],"genre_scores_gemma":[0.9990238,0.000052426803,0.00013336934,0.00000745134,0.000047490637,0.00004035026,0.000001943718,0.000069858484,0.0006233289],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99857146,0.000043131484,0.00050953374,0.00028622922,0.00028149632,0.0003081244],"domain_scores_gemma":[0.99874365,0.0000581714,0.00015329623,0.0008292318,0.000075587945,0.00014007687],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018077443,0.0002851633,0.00054952706,0.00016212038,0.00019062759,0.00012282189,0.0002908063,0.00019950733,0.000019739875],"category_scores_gemma":[0.000004393407,0.00026975386,0.00011757884,0.00005855058,0.0000652903,0.00032851566,0.0000020623697,0.00023170971,0.000038013524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014431927,0.00013777075,0.00001575453,0.0002851483,0.00053083804,0.000019870078,0.001378763,0.85072744,0.14593121,0.000043047046,0.00023360844,0.000552247],"study_design_scores_gemma":[0.0037175275,0.00026513022,0.00026262336,0.0004900283,0.00008513934,0.00007447316,0.00021032474,0.9222998,0.07006614,0.000014563405,0.0017865071,0.0007277655],"about_ca_topic_score_codex":0.00014822773,"about_ca_topic_score_gemma":0.000020023104,"teacher_disagreement_score":0.66603476,"about_ca_system_score_codex":0.000048848335,"about_ca_system_score_gemma":0.000025252171,"threshold_uncertainty_score":0.99997544},"labels":[],"label_agreement":null},{"id":"W2587544603","doi":"10.1109/tpwrs.2017.2665695","title":"A Fast Solution Method for Stochastic Transmission Expansion Planning","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Linearization; Reduction (mathematics); Stochastic programming; Computer science; Nonlinear system; Model order reduction; Benders' decomposition; Mathematics; Algorithm","score_opus":0.01999731207967152,"score_gpt":0.2772400854513618,"score_spread":0.25724277337169027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2587544603","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042904218,0.00031295078,0.9926319,0.000043656444,0.004034381,0.0011508871,0.000043846845,0.0005683016,0.0007850199],"genre_scores_gemma":[0.9911701,0.000011108339,0.007604743,0.000008604802,0.000040221108,0.0004271329,0.0000057911243,0.000099659606,0.0006326016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983867,0.00007242932,0.00045898074,0.00035805753,0.00029448813,0.00042935694],"domain_scores_gemma":[0.9989416,0.00014592483,0.0001379659,0.0005301153,0.000098670695,0.000145728],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042676044,0.00030257652,0.00036189315,0.00026606122,0.00077070243,0.00022104173,0.000294963,0.00024189924,0.000013366139],"category_scores_gemma":[0.000008621777,0.00030493367,0.0001641109,0.000117786665,0.00002140762,0.00041378872,7.7012703e-7,0.00023531549,0.000027686589],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007328899,0.00004900109,5.599845e-7,0.00016600525,0.00007726587,0.0000024105555,0.0007114065,0.9758275,0.0177344,0.000028960265,0.00055019493,0.004778964],"study_design_scores_gemma":[0.0009494325,0.0001677607,0.000018737648,0.00045552096,0.00007589457,0.00003920253,0.00010099506,0.9859057,0.010683715,0.000009870826,0.0012443917,0.00034879963],"about_ca_topic_score_codex":0.000056478366,"about_ca_topic_score_gemma":0.00000379485,"teacher_disagreement_score":0.9907411,"about_ca_system_score_codex":0.00021194751,"about_ca_system_score_gemma":0.000036239115,"threshold_uncertainty_score":0.9999403},"labels":[],"label_agreement":null},{"id":"W2588193832","doi":"10.1109/tpwrs.2017.2669260","title":"An LQR Controller for Damping of Subsynchronous Interaction in DFIG-Based Wind Farms","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":91,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan; Polytechnique Montréal","funders":"","keywords":"Control theory (sociology); Transient (computer programming); Linear-quadratic regulator; Converters; Engineering; Controller (irrigation); Induction generator; Grid code; Wind power; Control engineering; Electric power system; Transient response; AC power; Power (physics); Computer science; Voltage; Control (management); Physics","score_opus":0.01607530713207375,"score_gpt":0.2590375448431847,"score_spread":0.24296223771111095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588193832","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21656655,0.000121895355,0.77519774,0.000033894332,0.0057449047,0.0013667527,0.000111177294,0.00017507971,0.00068203197],"genre_scores_gemma":[0.99945265,0.0000023171428,0.000049011884,0.000010321193,0.000066869114,0.000267014,0.0000045358497,0.00007533923,0.00007196658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99842954,0.000072310955,0.0006529714,0.00029795273,0.00020798756,0.00033925296],"domain_scores_gemma":[0.99869365,0.0001611009,0.00020295443,0.0007365609,0.00010586145,0.00009989357],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00038090083,0.00026976372,0.0005717901,0.00033306648,0.00017350838,0.00015702323,0.00034262787,0.00018852921,0.000016696398],"category_scores_gemma":[0.000011542847,0.00027113088,0.0001847168,0.00007967572,0.00003928656,0.00046967858,5.0083366e-7,0.00023777767,0.000017473629],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024554416,0.00017907121,0.000386106,0.0002858396,0.00014199925,0.000004652579,0.0004452391,0.9744922,0.022841081,0.000022720664,0.00005289843,0.00090264715],"study_design_scores_gemma":[0.0062408415,0.00043128262,0.0021063467,0.00063798553,0.00006218506,0.000013732168,0.00036009122,0.97361004,0.014609286,0.0000055343435,0.0014701593,0.0004524871],"about_ca_topic_score_codex":0.00041450464,"about_ca_topic_score_gemma":0.00032074796,"teacher_disagreement_score":0.7828861,"about_ca_system_score_codex":0.00023857731,"about_ca_system_score_gemma":0.00003797697,"threshold_uncertainty_score":0.9999741},"labels":[],"label_agreement":null},{"id":"W2589115084","doi":"10.1109/tpwrs.2017.2669839","title":"Prediction of the Transient Stability Boundary Based on Nonparametric Additive Modeling","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"University of Manchester","keywords":"Nonparametric statistics; Electric power system; Transient (computer programming); Boundary (topology); Stability (learning theory); Context (archaeology); Kernel (algebra); Curse of dimensionality; Mathematics; Fault (geology); Computer science; Control theory (sociology); Mathematical optimization; Algorithm; Power (physics); Artificial intelligence; Machine learning; Statistics","score_opus":0.027014983280021457,"score_gpt":0.22045113585916376,"score_spread":0.19343615257914232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2589115084","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03912581,0.00004146817,0.9457598,0.000040931904,0.006087433,0.00081405486,0.0010425915,0.0001978451,0.0068900627],"genre_scores_gemma":[0.9997112,0.0000072427947,0.00006080213,0.0000130445005,0.0000070022033,0.000111703914,0.0000036527526,0.00003387955,0.000051461964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982294,0.00016355749,0.00056158344,0.00030861207,0.00050068874,0.00023615305],"domain_scores_gemma":[0.99816906,0.00011621092,0.00012267036,0.0013304739,0.0001647631,0.000096803706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047468877,0.00023312254,0.0003214263,0.00016739006,0.00052071916,0.00011883075,0.00035963638,0.00015544066,0.00008911056],"category_scores_gemma":[0.000027126755,0.00018638908,0.0002485063,0.00024095822,0.0001126479,0.00021366512,0.0000010719068,0.00031649772,0.000012503817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004994328,0.00016481549,0.00006610943,0.00011444909,0.00004543217,4.519861e-7,0.0004300221,0.9987191,0.00020618521,0.0000117813,0.00007786119,0.000113874754],"study_design_scores_gemma":[0.0005457992,0.00010772171,0.0009366264,0.00018109773,0.000033247597,0.0000020592947,0.00018844343,0.993894,0.0034509026,0.000002841621,0.0005088002,0.00014849158],"about_ca_topic_score_codex":0.00008948854,"about_ca_topic_score_gemma":0.000040814233,"teacher_disagreement_score":0.9605854,"about_ca_system_score_codex":0.00027551362,"about_ca_system_score_gemma":0.000078295656,"threshold_uncertainty_score":0.7600726},"labels":[],"label_agreement":null},{"id":"W2595259167","doi":"10.1109/tpwrs.2017.2682110","title":"A Pole-to-Pole Short-Circuit Fault Current Calculation Method for DC Grids","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":249,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Global Energy Interconnection Research Institute North America; University of Manitoba","keywords":"Fault current limiter; Converters; Fault (geology); Control theory (sociology); Modular design; RLC circuit; Voltage; Topology (electrical circuits); Grid; Equivalent circuit; Circuit breaker; Electronic engineering; Engineering; Partial element equivalent circuit; Transient (computer programming); Computer science; Capacitor; Electric power system; Mathematics; Electrical engineering; Power (physics); Physics","score_opus":0.0374666538765643,"score_gpt":0.31423924194397396,"score_spread":0.2767725880674097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2595259167","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040717204,0.00018883555,0.97891444,0.000040327235,0.013137616,0.0017643993,0.0001978296,0.00042095425,0.001263853],"genre_scores_gemma":[0.9973145,0.000009424075,0.0005542018,0.000009902042,0.00018423417,0.0011162673,0.0000054368966,0.00008357136,0.0007224269],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983435,0.00006440049,0.000503616,0.00038722347,0.00030275193,0.00039848455],"domain_scores_gemma":[0.998761,0.000054395983,0.00007941074,0.0007755517,0.00012841898,0.00020122238],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004724342,0.00029668145,0.00037577652,0.00024075512,0.0006108974,0.0002956007,0.00026381097,0.00020873033,0.000014496412],"category_scores_gemma":[0.000011129543,0.00029533732,0.00022715348,0.00012630524,0.00001871293,0.00029441752,0.0000012753706,0.00027104898,0.00012048956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085528525,0.00015481174,0.00004040183,0.0008700643,0.00036124795,0.0000044261733,0.0019061343,0.8733776,0.040521193,0.0005390588,0.0031360148,0.079003505],"study_design_scores_gemma":[0.0015038473,0.000439032,0.0006854077,0.00090405095,0.00017320544,0.00008033714,0.00032904616,0.7038614,0.03079957,0.000045984114,0.25990942,0.0012686847],"about_ca_topic_score_codex":0.00052298786,"about_ca_topic_score_gemma":0.00013835191,"teacher_disagreement_score":0.9932428,"about_ca_system_score_codex":0.000326374,"about_ca_system_score_gemma":0.000030601423,"threshold_uncertainty_score":0.9999499},"labels":[],"label_agreement":null},{"id":"W2601314166","doi":"10.1109/tpwrs.2017.2754940","title":"A Second-Order Cone Programming Model for Planning PEV Fast-Charging Stations","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":153,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"National Key Research and Development Program of China; National Natural Science Foundation of China","keywords":"Second-order cone programming; Computer science; Order (exchange); Electric power system; Mathematical optimization; Power (physics); Mathematics; Physics; Economics","score_opus":0.017382459183978058,"score_gpt":0.251398292818309,"score_spread":0.23401583363433093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2601314166","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0156933,0.00016915749,0.980541,0.00003454322,0.0013157099,0.0006072841,0.00015651445,0.00030725726,0.0011752658],"genre_scores_gemma":[0.9940914,0.0000061428946,0.004032986,0.000020893798,0.000032186683,0.0002874947,0.0000058774554,0.0000674199,0.001455592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989591,0.000010294235,0.00028116987,0.00021942012,0.00014735578,0.0003826207],"domain_scores_gemma":[0.99929667,0.000045085995,0.00008209799,0.00038277922,0.00009692031,0.00009645454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011106829,0.00020835683,0.00023073489,0.00012966506,0.00069148967,0.00029400716,0.00020026528,0.00012568862,0.000031085794],"category_scores_gemma":[0.0000039249067,0.00021104461,0.00009573305,0.00007865866,0.000026949258,0.0003308194,7.597296e-7,0.00027368974,0.000010401697],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000145475515,0.000021552903,0.0000124378475,0.00015350191,0.0001242639,0.000002506237,0.0016913703,0.9913701,0.0023234896,0.0002306841,0.00069649686,0.003359064],"study_design_scores_gemma":[0.00057573064,0.00006584772,0.00003418285,0.00011156181,0.000033035354,0.000018138817,0.00032348762,0.9924239,0.0016110745,0.00004809462,0.004492385,0.00026256844],"about_ca_topic_score_codex":0.00001756956,"about_ca_topic_score_gemma":0.00002573312,"teacher_disagreement_score":0.9783981,"about_ca_system_score_codex":0.00008188702,"about_ca_system_score_gemma":0.00003607918,"threshold_uncertainty_score":0.86061496},"labels":[],"label_agreement":null},{"id":"W2610928412","doi":"","title":"Corrections to “Impacts of Strategic Bidding of Wind Power Producers on Electricity Markets”","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Bidding; Wind power; Electricity; Electricity market; Industrial organization; Environmental economics; Electricity generation; Economics; Power (physics); Business; Microeconomics; Natural resource economics; Engineering; Electrical engineering; Physics","score_opus":0.01899900792004544,"score_gpt":0.23931878113299124,"score_spread":0.2203197732129458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2610928412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49779987,0.00012052837,0.46223548,0.000048968494,0.008506404,0.0014590897,0.00011445829,0.00032880928,0.0293864],"genre_scores_gemma":[0.99925226,0.000024271287,0.0000843267,0.0000081588105,0.000018592023,0.000043837597,0.0000014846015,0.000074249394,0.0004928116],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9980174,0.00009668269,0.0006643897,0.00035364562,0.00044923794,0.00041867406],"domain_scores_gemma":[0.9981864,0.000117554104,0.0002831988,0.0010264129,0.00021052209,0.0001759094],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004342156,0.00031203666,0.00050558394,0.00067176536,0.000251169,0.000100038786,0.0003800603,0.0001851404,0.000054609853],"category_scores_gemma":[0.000037432867,0.000319365,0.00015280173,0.0005895975,0.0000410683,0.00026414558,0.000001522706,0.00030874574,0.00004437308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022996198,0.00035612652,0.00019227114,0.00036392867,0.00043831885,0.0000067366336,0.0010170144,0.94500977,0.050685246,0.0002744559,0.0011046819,0.000321484],"study_design_scores_gemma":[0.003926753,0.005207137,0.009490671,0.0042272415,0.00045322164,0.00015313493,0.0016513459,0.1785463,0.7914269,0.000036089317,0.0020874392,0.0027937526],"about_ca_topic_score_codex":0.00020786372,"about_ca_topic_score_gemma":0.00003393456,"teacher_disagreement_score":0.76646346,"about_ca_system_score_codex":0.00031064014,"about_ca_system_score_gemma":0.00008994849,"threshold_uncertainty_score":0.99992585},"labels":[],"label_agreement":null},{"id":"W2618635432","doi":"10.1109/tpwrs.2017.2708662","title":"Coordinated Protection and Control Based on Synchrophasor Data Processing in Smart Distribution Networks","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Islanding Detection in Power Systems","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Smart grid; Fault (geology); Situation awareness; Engineering; Distributed generation; Control engineering; Electric power system; Fault detection and isolation; Controller (irrigation); Phasor; SCADA; AC power; Renewable energy; Fault tolerance; Computer science; Reliability engineering; Distributed computing; Voltage; Power (physics); Electrical engineering; Actuator","score_opus":0.017118022658953867,"score_gpt":0.2307834879787044,"score_spread":0.21366546531975053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2618635432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006272674,0.0001467415,0.98514324,0.00005918374,0.0062219463,0.001085017,0.00023526377,0.00043863364,0.000397306],"genre_scores_gemma":[0.99944973,0.000007342357,0.000013052635,0.0000097548345,0.000040930845,0.00030512307,0.000021540041,0.000060508788,0.000092019225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836296,0.000119988086,0.00045210504,0.0004645213,0.0002503428,0.00035007505],"domain_scores_gemma":[0.9985657,0.000053146712,0.0001535613,0.0010687099,0.00006732815,0.000091559166],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005881672,0.0002907712,0.00035211205,0.00021470696,0.0005751617,0.00045976636,0.00033753968,0.00024978135,0.000009364367],"category_scores_gemma":[0.00002157404,0.0002918664,0.00004354407,0.00019286686,0.00007385759,0.0004703521,0.0000021013097,0.0004959449,0.000020445921],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028619647,0.00014408708,0.0003477504,0.0003977569,0.000070484784,0.00002665666,0.00010676749,0.99392766,0.00079597457,0.000008390047,0.00051188783,0.0033763975],"study_design_scores_gemma":[0.0016987488,0.00016169887,0.0009874108,0.00069278106,0.000031107418,0.000032520657,0.000038186387,0.9942873,0.00042161666,0.0000010156136,0.0013514741,0.00029610327],"about_ca_topic_score_codex":0.00027880812,"about_ca_topic_score_gemma":0.00008985737,"teacher_disagreement_score":0.99317706,"about_ca_system_score_codex":0.00028620334,"about_ca_system_score_gemma":0.000026909762,"threshold_uncertainty_score":0.9999533},"labels":[],"label_agreement":null},{"id":"W2717130246","doi":"10.1109/tpwrs.2017.2718512","title":"Demonstrating Stacked Services of a Battery in a Wind R&amp;D Park","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wind Energy Institute of Canada","funders":"","keywords":"Automatic Generation Control; Wind power; Limiting; Wind speed; Battery (electricity); Electric power system; Engineering; Power (physics); Electrical engineering; Automotive engineering; Reliability engineering; Meteorology; Geography","score_opus":0.009732631747709055,"score_gpt":0.21321280479187457,"score_spread":0.20348017304416552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2717130246","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43107384,0.00048013282,0.5635375,0.000036579284,0.0020084067,0.00039386025,0.000066469845,0.00013726168,0.002265939],"genre_scores_gemma":[0.9995467,0.00004558303,0.00027434697,0.0000076228303,0.0000118483185,0.000021517122,0.0000018019751,0.000021614225,0.000068938105],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923474,0.000027194745,0.00032298415,0.00013201313,0.00011406715,0.00016901742],"domain_scores_gemma":[0.9994433,0.000031867883,0.00008655445,0.00036493535,0.000032851847,0.000040518615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012763347,0.00012861041,0.00021790774,0.00011897806,0.000104411396,0.0000937881,0.0001683332,0.00008704405,0.00002724499],"category_scores_gemma":[0.0000013224155,0.00012962888,0.000057432986,0.00006516045,0.00002257367,0.00022910385,5.7676516e-7,0.00013361768,0.000019762969],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026330445,0.00005534661,0.0007613532,0.0002868228,0.00007738517,0.0000042459264,0.0010378392,0.9892051,0.007387496,0.0000067377637,0.000032246513,0.0011190748],"study_design_scores_gemma":[0.00314984,0.00013483211,0.0052527967,0.0017364629,0.000094526215,0.000032592114,0.0012402899,0.9761304,0.008735555,0.0000137476545,0.002663621,0.0008153013],"about_ca_topic_score_codex":0.00022220994,"about_ca_topic_score_gemma":0.00038874854,"teacher_disagreement_score":0.56847286,"about_ca_system_score_codex":0.000032589836,"about_ca_system_score_gemma":0.000011886776,"threshold_uncertainty_score":0.52861124},"labels":[],"label_agreement":null},{"id":"W2725114381","doi":"10.1109/tpwrs.2017.2720666","title":"A Generalized Approach to the Load Flow Analysis of AC–DC Hybrid Distribution Systems","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"AC power; Power flow; Grid; Power (physics); Control theory (sociology); Computer science; Power-flow study; Electric power system; Hybrid system; Binary number; Topology (electrical circuits); Electronic engineering; Engineering; Voltage; Mathematics; Electrical engineering; Physics","score_opus":0.010243433669693065,"score_gpt":0.20588335623299234,"score_spread":0.19563992256329926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2725114381","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007481153,0.0007172794,0.9869301,0.00004042062,0.0025649993,0.0006120477,0.00079745235,0.00013440134,0.00072219933],"genre_scores_gemma":[0.9991614,0.00008026136,0.00012203193,0.000008309934,0.000032060016,0.0002200128,0.000048187052,0.000025306623,0.00030239913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987133,0.000073472715,0.0004184378,0.00023426219,0.00032667496,0.00023383864],"domain_scores_gemma":[0.99868757,0.000027261429,0.00011839388,0.00091575744,0.00016285593,0.000088192515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033177662,0.00019864787,0.00043809807,0.00014782955,0.00031991466,0.00025064408,0.0003681604,0.000080842154,0.000011894837],"category_scores_gemma":[0.00000636014,0.0001521514,0.0002504645,0.0003154828,0.000029187242,0.00014730332,0.000001533198,0.00013211522,0.00002686764],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025862899,0.00004855409,0.0000068942686,0.000049751365,0.0009381031,7.6410726e-7,0.00021477196,0.9966392,0.0006131565,0.000040767773,0.0010100114,0.00041215564],"study_design_scores_gemma":[0.00038037935,0.000025810448,0.00012582123,0.00003726329,0.0005867927,0.0000067518304,0.000080962534,0.9912807,0.0010793152,3.308813e-7,0.0062237782,0.00017213209],"about_ca_topic_score_codex":0.0005319646,"about_ca_topic_score_gemma":0.00005301911,"teacher_disagreement_score":0.99168026,"about_ca_system_score_codex":0.00016351779,"about_ca_system_score_gemma":0.00002173091,"threshold_uncertainty_score":0.62045544},"labels":[],"label_agreement":null},{"id":"W2733309778","doi":"10.1109/tpwrs.2017.2721547","title":"Multiphase Load-Flow Solution and Initialization of Induction Machines","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Initialization; Control theory (sociology); AC power; Computation; Newton's method; Power-flow study; Flow (mathematics); Computer science; Induction motor; Iterative method; Slip (aerodynamics); Torque; Mathematical optimization; Voltage; Mathematics; Mechanics; Algorithm; Engineering; Physics; Nonlinear system","score_opus":0.011993123909298997,"score_gpt":0.2224103568285736,"score_spread":0.2104172329192746,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2733309778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013719187,0.0004258619,0.9821541,0.00002448502,0.0027017402,0.00024153381,0.00004716895,0.00012451777,0.0005614185],"genre_scores_gemma":[0.9992137,0.00021754521,0.00039834168,0.000004240977,0.000027483062,0.000027369433,0.000004694855,0.000021362828,0.00008528641],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999375,0.000027408152,0.0002314907,0.00012746951,0.00013012192,0.00010854367],"domain_scores_gemma":[0.9995133,0.000014212556,0.00008626015,0.0002498573,0.00009389209,0.000042468422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012037065,0.000119612094,0.0001553199,0.00009901123,0.00021700432,0.00008239017,0.00007108123,0.0001026657,0.000017849832],"category_scores_gemma":[0.0000060830985,0.00011973811,0.000040163904,0.000048023652,0.000041241667,0.00033685256,6.0104395e-7,0.00008914976,0.0000066826287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054990927,0.00006726366,0.000046815272,0.00013487102,0.00007919865,0.0000015064924,0.0005232267,0.96027875,0.019898893,0.00002435685,0.00015213745,0.018737981],"study_design_scores_gemma":[0.00086017366,0.00005851536,0.00024398809,0.000085593725,0.000037993483,0.000014814454,0.00003438419,0.99097234,0.006909046,0.000006154264,0.00063397514,0.00014304048],"about_ca_topic_score_codex":0.00018558586,"about_ca_topic_score_gemma":0.000058960377,"teacher_disagreement_score":0.9854945,"about_ca_system_score_codex":0.000051303316,"about_ca_system_score_gemma":0.000012720529,"threshold_uncertainty_score":0.48827785},"labels":[],"label_agreement":null},{"id":"W2741075329","doi":"10.1109/tpwrs.2017.2733580","title":"Locally Weighted Ridge Regression for Power System Online Sensitivity Identification Considering Data Collinearity","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Fundamental Research Funds for the Central Universities; South China University of Technology; Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China; Huazhong University of Science and Technology; University of Saskatchewan","keywords":"Collinearity; Tikhonov regularization; Sensitivity (control systems); Regression; Computer science; Mathematical optimization; Regression analysis; Electric power system; Identification (biology); Linear regression; Nonlinear system; Mathematics; Control theory (sociology); Power (physics); Statistics; Engineering; Artificial intelligence; Inverse problem; Electronic engineering","score_opus":0.04405875772751694,"score_gpt":0.2837132030164526,"score_spread":0.23965444528893565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741075329","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018447949,0.00011698188,0.9647438,0.00007661903,0.009204713,0.0014409135,0.004463303,0.0008237151,0.00068199047],"genre_scores_gemma":[0.9983211,0.000014524143,0.00092259934,0.00001170477,0.000027495473,0.00010549654,0.00016105892,0.00007981973,0.00035616808],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974081,0.00020410394,0.00089135236,0.0006912393,0.00040718657,0.00039801782],"domain_scores_gemma":[0.9959309,0.00023358966,0.00030604916,0.0029683232,0.00035575437,0.00020537403],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012573457,0.0003812215,0.0005822458,0.00016419313,0.00090795895,0.00049451203,0.00056454504,0.00029025,0.000020674986],"category_scores_gemma":[0.000049864255,0.0003657522,0.00014673713,0.00013142088,0.000099248515,0.00073153264,0.000009502477,0.00029977004,0.000051767343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015544839,0.0031923803,0.0011057353,0.011183908,0.0028715208,0.000280449,0.0043287845,0.89377123,0.04695262,0.0023580133,0.028489219,0.0039116344],"study_design_scores_gemma":[0.0010602485,0.000054427135,0.0006392989,0.00060401607,0.000078784426,0.00007233564,0.0004639457,0.9849535,0.0045804414,0.0000018824009,0.007010818,0.00048028794],"about_ca_topic_score_codex":0.00014387464,"about_ca_topic_score_gemma":0.00035984957,"teacher_disagreement_score":0.9798732,"about_ca_system_score_codex":0.00031253303,"about_ca_system_score_gemma":0.00007984372,"threshold_uncertainty_score":0.9998794},"labels":[],"label_agreement":null},{"id":"W2749664490","doi":"10.1109/tpwrs.2017.2741920","title":"Optimal Regulation of Virtual Power Plants","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":188,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Advanced Research Projects Agency - Energy; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Dispatchable generation; Distributed generation; Computer science; Mathematical optimization; Convergence (economics); Virtual power plant; AC power; Optimization problem; Distributed computing; Control engineering; Linear programming; Engineering; Voltage; Renewable energy; Mathematics","score_opus":0.011368927035735985,"score_gpt":0.21113665447886784,"score_spread":0.19976772744313187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749664490","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18194637,0.000036687325,0.79406464,0.000018870598,0.008597135,0.00019866595,0.000043905733,0.00022157055,0.014872185],"genre_scores_gemma":[0.99832445,0.000012668262,0.00009011463,0.000004321955,0.00002274203,0.000034330344,0.0000019424233,0.000039180446,0.0014702571],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990776,0.000020450374,0.00028451343,0.0001673828,0.0002588304,0.00019118903],"domain_scores_gemma":[0.9990963,0.000025154588,0.00007819952,0.0007088433,0.0000312017,0.000060297967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012801064,0.00016020525,0.00020328302,0.00014755518,0.00015467408,0.0000704094,0.0002481079,0.00009411625,0.00011680893],"category_scores_gemma":[0.0000019475951,0.00016595845,0.00008112914,0.000042190935,0.000041958465,0.00023726856,0.0000014058108,0.00011241974,0.00010147409],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002283838,0.000037784812,0.000011922276,0.000025389429,0.00012515014,0.0000036363683,0.00020755646,0.99351966,0.003664545,0.00020472148,0.0020052716,0.00017154969],"study_design_scores_gemma":[0.003214728,0.00082818855,0.019028597,0.00078292476,0.00015855183,0.000064225955,0.0011902519,0.7509767,0.17045687,0.000015227672,0.051763553,0.0015202113],"about_ca_topic_score_codex":0.000059891026,"about_ca_topic_score_gemma":0.000013332884,"teacher_disagreement_score":0.81637806,"about_ca_system_score_codex":0.000073220646,"about_ca_system_score_gemma":0.000007746368,"threshold_uncertainty_score":0.6767589},"labels":[],"label_agreement":null},{"id":"W2751050958","doi":"10.1109/tpwrs.2017.2749303","title":"Security-Constrained Unit Commitment for AC-DC Grids With Generation and Load Uncertainty","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Power system simulation; Mathematical optimization; Iterative method; Computer science; Electric power system; Mathematics; Power (physics)","score_opus":0.016984519759478053,"score_gpt":0.2313541862627911,"score_spread":0.21436966650331307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2751050958","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026122315,0.00017141657,0.9677903,0.00009094352,0.0022942286,0.0012603097,0.00013016278,0.0002726303,0.0018676956],"genre_scores_gemma":[0.9987138,0.000037524438,0.00030507418,0.00001499703,0.000046433015,0.00038153352,0.000013498224,0.000053388198,0.0004337548],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988381,0.000047364054,0.00030928268,0.00027548833,0.00024683398,0.00028287506],"domain_scores_gemma":[0.9990104,0.0000606064,0.00010449838,0.0005470465,0.0001650492,0.00011239303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027492616,0.00025563347,0.0002850543,0.000115666095,0.00052289857,0.00029331498,0.0001682547,0.00014278312,0.0000106424095],"category_scores_gemma":[0.0000054291245,0.00023331119,0.00005445029,0.00008879802,0.00006439827,0.0002945882,8.2961037e-7,0.00016068575,0.000008150894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116682895,0.000121748126,0.000069305315,0.00037443766,0.00048891944,0.000008918956,0.0014371047,0.9901882,0.0038759813,0.00077886076,0.0015125282,0.0010273062],"study_design_scores_gemma":[0.0031766552,0.00068960356,0.00005859473,0.00028537112,0.00015825997,0.00011587225,0.00031181576,0.9752507,0.011262012,0.000016450385,0.007994044,0.00068057585],"about_ca_topic_score_codex":0.00014685025,"about_ca_topic_score_gemma":0.00030508937,"teacher_disagreement_score":0.97259146,"about_ca_system_score_codex":0.00022364891,"about_ca_system_score_gemma":0.00006388668,"threshold_uncertainty_score":0.9514155},"labels":[],"label_agreement":null},{"id":"W2754461651","doi":"10.1109/tpwrs.2018.2804353","title":"Setpoint Tracking With Partially Observed Loads","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Setpoint; Control theory (sociology); News aggregator; Regret; Bernoulli's principle; Sublinear function; Computer science; Tracking (education); Mathematical optimization; Regular polygon; Mathematics; Engineering; Control (management); Artificial intelligence","score_opus":0.02129197608899595,"score_gpt":0.20139526829702517,"score_spread":0.18010329220802923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2754461651","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046198398,0.000052194948,0.93937814,0.000055718912,0.0058691157,0.00027406952,0.000011266543,0.0008543134,0.007306753],"genre_scores_gemma":[0.99859613,0.000008392422,0.0002139737,0.000060370265,0.00009560124,0.000114107745,0.0000015465188,0.00007980518,0.00083006924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99874717,0.000038531936,0.00029711882,0.0002634611,0.00029418844,0.00035955408],"domain_scores_gemma":[0.99926436,0.00003069768,0.00003334635,0.00048538754,0.00007453391,0.00011169794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015299009,0.0002450282,0.00022131835,0.00014349996,0.00013038857,0.00010632703,0.0001744028,0.00008401825,0.00013241102],"category_scores_gemma":[9.1284534e-7,0.00021967817,0.000072202114,0.00028953154,0.000054353,0.00019833731,7.293182e-7,0.00016988955,0.00035469266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040320025,0.0000613036,0.000030574527,0.00006548839,0.000259672,0.000021262904,0.00051098136,0.9944951,0.0017981919,0.00010711719,0.0022022645,0.00040775773],"study_design_scores_gemma":[0.003698233,0.0021377492,0.002873047,0.0011342772,0.0003899086,0.00018284346,0.001343143,0.5390836,0.19120164,0.000017794086,0.25538734,0.0025503892],"about_ca_topic_score_codex":0.0000704342,"about_ca_topic_score_gemma":0.00027519377,"teacher_disagreement_score":0.95239776,"about_ca_system_score_codex":0.00013752929,"about_ca_system_score_gemma":0.000016445902,"threshold_uncertainty_score":0.89582163},"labels":[],"label_agreement":null},{"id":"W2764592786","doi":"10.1109/tpwrs.2003.821473","title":"An Investigation on the Reactive Power Support Service Needs of Power Producers","year":2004,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"AC power; Electric power system; Generator (circuit theory); Power (physics); Compensation (psychology); Profit (economics); Volt-ampere reactive; Computer science; Power-flow study; Service (business); Electrical engineering; Engineering; Business; Voltage; Economics; Microeconomics; Marketing; Physics","score_opus":0.01257743117357926,"score_gpt":0.2048939229711233,"score_spread":0.19231649179754404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764592786","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.398274,0.00006466223,0.58169574,0.0006618083,0.005658691,0.002042437,0.00009694139,0.0008538638,0.010651854],"genre_scores_gemma":[0.9992245,0.0000068726104,0.000074432886,0.0001946418,0.000018315632,0.0001753323,0.0000108715485,0.00010839052,0.00018668169],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9979461,0.00015939154,0.0006397149,0.00031500592,0.0005537687,0.0003860264],"domain_scores_gemma":[0.998342,0.00010384459,0.00017596794,0.0009306609,0.00028742212,0.00016012586],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005045048,0.00037083577,0.00035976229,0.000499002,0.00015191428,0.00007784941,0.0003498158,0.00022886792,0.00008287139],"category_scores_gemma":[0.000008442662,0.0003109468,0.00011126047,0.001446821,0.00005298642,0.00049362076,9.1446327e-7,0.00041769835,0.00015912877],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006597916,0.00020230064,0.0000187747,0.00009614736,0.00022152247,0.0000038421917,0.014454889,0.95462227,0.028625172,0.0010517004,0.00060611096,0.00003130269],"study_design_scores_gemma":[0.0041884896,0.005013281,0.0007888591,0.001719997,0.00037985618,0.00031884885,0.020825336,0.03317516,0.926991,0.00020058657,0.0036382806,0.0027602983],"about_ca_topic_score_codex":0.00021779018,"about_ca_topic_score_gemma":0.00002936114,"teacher_disagreement_score":0.9214471,"about_ca_system_score_codex":0.0004724883,"about_ca_system_score_gemma":0.0001460705,"threshold_uncertainty_score":0.99993426},"labels":[],"label_agreement":null},{"id":"W2764596441","doi":"10.1109/tpwrs.2006.883670","title":"A Voltage-Behind-Reactance Synchronous Machine Model for the EMTP-Type Solution","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":90,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Emtp; Reactance; Stator; Transient (computer programming); Control theory (sociology); Rotor (electric); Engineering; Voltage; Computer science; Electric power system; Electrical engineering; Physics; Power (physics)","score_opus":0.010099725696053516,"score_gpt":0.21242370246601922,"score_spread":0.2023239767699657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764596441","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016479201,0.0012870828,0.9894126,0.000061366,0.0035047627,0.0011424278,0.000097835,0.00050789287,0.0023381263],"genre_scores_gemma":[0.99483883,0.00002154584,0.00006452197,0.000024820434,0.000083699226,0.00031121547,0.000009943398,0.00007268991,0.004572709],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986455,0.000032729582,0.0004687549,0.00024420963,0.00026437218,0.00034445213],"domain_scores_gemma":[0.99914104,0.0001614056,0.00007465525,0.00045225912,0.00010718232,0.00006348765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023940373,0.00026041045,0.00028409116,0.00010987834,0.00028201888,0.00013155611,0.00018177052,0.00014530538,0.000024604471],"category_scores_gemma":[0.0000023973346,0.00020622769,0.0001756847,0.00015736584,0.00002658376,0.00020293561,4.8091283e-7,0.00019325658,0.00009457565],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046572608,0.000047719048,0.0000035493626,0.00005653186,0.00008110031,8.9826233e-7,0.00018538257,0.9919817,0.0053480775,0.00017396474,0.0014721903,0.00060235057],"study_design_scores_gemma":[0.0007402338,0.000051604857,0.000027339434,0.00004867627,0.000057225403,0.000014856642,0.000040961248,0.99066067,0.0003902321,0.000022617507,0.007717361,0.00022822383],"about_ca_topic_score_codex":0.0005018024,"about_ca_topic_score_gemma":0.00032644637,"teacher_disagreement_score":0.99319094,"about_ca_system_score_codex":0.00018893444,"about_ca_system_score_gemma":0.000028736473,"threshold_uncertainty_score":0.84097207},"labels":[],"label_agreement":null},{"id":"W2764718516","doi":"10.1109/tpwrs.2003.818706","title":"Online voltage stability monitoring using var reserves","year":2003,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Controllability; Electric power system; Voltage; Generator (circuit theory); Key (lock); Computer science; Stability (learning theory); Control theory (sociology); Reliability engineering; Power (physics); Engineering; Control (management); Mathematics; Electrical engineering","score_opus":0.0405507805511182,"score_gpt":0.2565697222587085,"score_spread":0.21601894170759028,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2764718516","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20316523,0.00031726295,0.7870189,0.0000036214478,0.0064379624,0.00037873638,0.00012236275,0.00051030534,0.0020456295],"genre_scores_gemma":[0.99888414,0.000020095122,0.0007360499,0.0000035327746,0.000012235409,0.00003722095,0.00000207398,0.00006514613,0.00023951699],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99803674,0.00021517591,0.00062810024,0.00036241513,0.00035371404,0.0004038494],"domain_scores_gemma":[0.998793,0.00010724816,0.000057379904,0.00071869034,0.00013078799,0.00019285904],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005238836,0.00029990132,0.00037434243,0.00017008086,0.00019786062,0.00010199218,0.0001744498,0.0001767869,0.00018677849],"category_scores_gemma":[0.000018464425,0.00030696654,0.00015228149,0.00044488264,0.000042009484,0.00030154278,7.7386704e-7,0.0003237419,0.0000352747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016959952,0.00035512252,0.0013558951,0.0003005388,0.000118789,0.0000072905386,0.0009189569,0.9894457,0.0073089795,0.000085143634,0.00005326676,0.000033379623],"study_design_scores_gemma":[0.0033079754,0.000397859,0.002345799,0.0010377595,0.00021651768,0.00018136679,0.010053909,0.78411466,0.17060487,0.000039987914,0.024640767,0.0030585285],"about_ca_topic_score_codex":0.000089146604,"about_ca_topic_score_gemma":0.000031007068,"teacher_disagreement_score":0.7957189,"about_ca_system_score_codex":0.00037409266,"about_ca_system_score_gemma":0.0000491681,"threshold_uncertainty_score":0.99993825},"labels":[],"label_agreement":null},{"id":"W2765000871","doi":"10.1109/tpwrs.2006.888986","title":"Formulation of Oligopolistic Competition in AC Power Networks: An NLP Approach","year":2007,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Oligopoly; Node (physics); Competition (biology); Electric power system; Computer science; Operator (biology); Set (abstract data type); Market power; AC power; Nonlinear system; Mathematical optimization; Power (physics); Voltage; Operations research; Economics; Engineering; Mathematical economics; Mathematics; Microeconomics; Cournot competition; Electrical engineering","score_opus":0.009325294611882992,"score_gpt":0.21849887598709805,"score_spread":0.20917358137521505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765000871","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023168854,0.00016689648,0.9658328,0.000002165536,0.002155686,0.0006434018,0.000017354118,0.00029565484,0.007717154],"genre_scores_gemma":[0.99917567,0.000016862765,0.0005653691,0.000007797675,0.000023974648,0.00004844913,0.000024159506,0.00006599891,0.0000717079],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815595,0.000086817905,0.00077865965,0.00025741034,0.00031742838,0.0004037601],"domain_scores_gemma":[0.9991935,0.000093883595,0.00011365438,0.00038862485,0.000099446625,0.00011089355],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006213806,0.00024365382,0.0003524667,0.0006103664,0.000061325925,0.00003817791,0.00015529401,0.00024531927,0.000021720867],"category_scores_gemma":[0.0000034817172,0.00026711676,0.000078940466,0.000840499,0.000021603695,0.0003987614,5.6893646e-7,0.00026215898,0.000012108425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037716956,0.00017319877,0.00006515048,0.00009940472,0.000035217534,0.0000025745417,0.0005874193,0.9968378,0.0006922085,0.001323674,0.000031301053,0.00011432024],"study_design_scores_gemma":[0.000762335,0.00022124186,0.0009963276,0.00019179912,0.000028026177,0.000040145937,0.0004392468,0.994753,0.0020235449,0.00001283273,0.00016616195,0.00036535188],"about_ca_topic_score_codex":0.00012396275,"about_ca_topic_score_gemma":0.000076163466,"teacher_disagreement_score":0.9760068,"about_ca_system_score_codex":0.00033678798,"about_ca_system_score_gemma":0.000019639676,"threshold_uncertainty_score":0.9999781},"labels":[],"label_agreement":null},{"id":"W2765038056","doi":"10.1109/tpwrs.2006.879254","title":"Multilevel MATE for Efficient Simultaneous Solution of Control Systems and Nonlinearities in the OVNI Simulator","year":2006,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Integrator; Electric power system; Software; Thévenin's theorem; Power system simulation; Simulation; Computer science; Control engineering; Control system; Power system simulator for engineering; Power (physics); Control (management); Engineering; Control theory (sociology); Voltage","score_opus":0.007562469199661548,"score_gpt":0.2121225624399744,"score_spread":0.20456009324031285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765038056","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10271013,0.0007585337,0.8921001,0.000020181242,0.0016646048,0.0019526931,0.00033261965,0.00014404814,0.00031709264],"genre_scores_gemma":[0.99937284,0.000005281038,0.000021885518,0.00000936887,0.000045679877,0.00027335857,0.0000052556506,0.000039918144,0.0002264171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983784,0.00012084036,0.0007159546,0.00020754545,0.0002848266,0.00029244286],"domain_scores_gemma":[0.99866784,0.0008058654,0.000102131955,0.0002668892,0.00011389278,0.00004340713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004223099,0.000230609,0.00043011643,0.00019569667,0.00010905538,0.00010606321,0.00011979762,0.00014852025,0.0000028366878],"category_scores_gemma":[0.00000746533,0.00018362704,0.00011240126,0.00013616403,0.000044133278,0.00007665596,4.1221594e-7,0.00013186575,0.0000071838167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071138486,0.000092743845,0.000016021577,0.00029886607,0.00004534628,0.0000026435996,0.00033507234,0.9968506,0.0019333857,0.00019530048,0.00004345076,0.000115412775],"study_design_scores_gemma":[0.0021883177,0.00008852247,0.0000917457,0.00015814438,0.000037827813,0.000017739967,0.00055973034,0.9955036,0.00018171711,0.0000028997722,0.000988378,0.00018138201],"about_ca_topic_score_codex":0.0008476986,"about_ca_topic_score_gemma":0.00006885374,"teacher_disagreement_score":0.8966627,"about_ca_system_score_codex":0.00008480683,"about_ca_system_score_gemma":0.000016109661,"threshold_uncertainty_score":0.74880934},"labels":[],"label_agreement":null},{"id":"W2766571422","doi":"10.1109/tpwrs.2017.2764420","title":"Power System Operational Adequacy Evaluation With Wind Power Ramp Limits","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Wind power; Electric power system; Control theory (sociology); Range (aeronautics); Power (physics); Limit (mathematics); Engineering; Computer science; Reliability engineering; Mathematics; Electrical engineering","score_opus":0.014961855964609782,"score_gpt":0.2344076795999113,"score_spread":0.21944582363530152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2766571422","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022088619,0.00039098537,0.91464204,0.00009607593,0.0086510405,0.0021492683,0.00009367052,0.00087031355,0.05101799],"genre_scores_gemma":[0.9977463,0.000011460812,0.00025973725,0.000024342442,0.000050058257,0.00034969184,0.00001627656,0.00016211395,0.0013800259],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965113,0.0002272983,0.0007609893,0.0006120533,0.001302865,0.0005854917],"domain_scores_gemma":[0.9973623,0.00010907663,0.00026900898,0.0014488413,0.00057326216,0.00023749005],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009152075,0.00054322794,0.00055872306,0.00039330343,0.0008816411,0.0007838703,0.00055517943,0.0003359828,0.00026523304],"category_scores_gemma":[0.000021145548,0.00049923593,0.00015395787,0.00030232748,0.00007133185,0.0011364982,0.0000019692968,0.0004377982,0.00050079514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010810534,0.00014458253,0.00007605789,0.00017855882,0.00050964084,0.000026501197,0.0010192835,0.993331,0.0018555829,0.0007873474,0.0017753802,0.00018796035],"study_design_scores_gemma":[0.008185768,0.0016239678,0.0021337,0.0027714497,0.0005877432,0.0010209903,0.0018705346,0.94950634,0.01751905,0.0000070076676,0.011698926,0.0030745144],"about_ca_topic_score_codex":0.00006665608,"about_ca_topic_score_gemma":0.000024730167,"teacher_disagreement_score":0.9756577,"about_ca_system_score_codex":0.0008573861,"about_ca_system_score_gemma":0.0002024226,"threshold_uncertainty_score":0.9997459},"labels":[],"label_agreement":null},{"id":"W2767597012","doi":"10.1109/tpwrs.2017.2771323","title":"An Improved Single-Machine Equivalent Method of Wind Power Plants by Calibrating Power Recovery Behaviors","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"National Key Research and Development Program of China; National Natural Science Foundation of China","keywords":"Wind power; Control theory (sociology); Power (physics); Electric power system; Turbine; Fault (geology); Process (computing); AC power; Power system simulation; Voltage; Engineering; Computer science; Electrical engineering","score_opus":0.013243589268994615,"score_gpt":0.25346898140047824,"score_spread":0.24022539213148364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2767597012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22147551,0.0005209292,0.762028,0.00003446273,0.010339757,0.00106067,0.0013263064,0.0004722952,0.0027421082],"genre_scores_gemma":[0.9987039,0.000006848016,0.00038365496,0.000016284053,0.000040466122,0.00007122939,0.000014756477,0.00017331855,0.00058954343],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9970648,0.00022648311,0.0010383781,0.0005603774,0.00049789174,0.00061202503],"domain_scores_gemma":[0.9974103,0.00015126764,0.00041394526,0.0016261253,0.00009959556,0.00029875373],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006368626,0.0005457135,0.0008493619,0.00025958067,0.00034635377,0.00032788597,0.000700068,0.00036796066,0.00011560006],"category_scores_gemma":[0.000014463782,0.0005312322,0.0002918564,0.0001032098,0.00006421421,0.00088708877,0.0000041443827,0.0004974984,0.000030200896],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016402539,0.0005819744,0.00014969737,0.00018852479,0.00050073443,0.000029596888,0.001247896,0.08060729,0.9146366,0.000010046832,0.0008676449,0.0010159913],"study_design_scores_gemma":[0.010721203,0.006034535,0.001628631,0.002457546,0.00069465564,0.0006226011,0.0024062016,0.30799615,0.65451205,0.000017710336,0.008140934,0.0047677904],"about_ca_topic_score_codex":0.0008642129,"about_ca_topic_score_gemma":0.00006744668,"teacher_disagreement_score":0.7772284,"about_ca_system_score_codex":0.00021889582,"about_ca_system_score_gemma":0.000040242,"threshold_uncertainty_score":0.9997139},"labels":[],"label_agreement":null},{"id":"W2768078044","doi":"10.1109/tpwrs.2017.2770151","title":"Dynamic Security-Constrained Automatic Generation Control (AGC) of Integrated AC/DC Power Networks","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Voltage droop; Control theory (sociology); Converters; Electric power system; AC power; Emulation; Benchmark (surveying); Computer science; Sensitivity (control systems); MATLAB; Power (physics); Voltage; Engineering; Control engineering; Voltage regulator; Electronic engineering; Control (management); Electrical engineering","score_opus":0.007137427644884064,"score_gpt":0.2175538614150244,"score_spread":0.21041643377014033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768078044","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1015193,0.00018577543,0.8885363,0.000027074526,0.007152795,0.0009157618,0.00013437145,0.00041957395,0.0011090657],"genre_scores_gemma":[0.9993838,0.000017664144,0.00007193192,0.000008876733,0.00003201514,0.00020373028,0.000008152258,0.00006264484,0.0002111481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983317,0.00011493512,0.0007018349,0.00027451693,0.00025964138,0.00031735533],"domain_scores_gemma":[0.99872255,0.000043253956,0.00023548533,0.00074461685,0.00014373439,0.00011035171],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039922583,0.0003114965,0.00050055626,0.00020066739,0.0003486622,0.00020489817,0.0002508063,0.00032709938,0.00009764759],"category_scores_gemma":[0.000009979202,0.00029284979,0.0001833804,0.00013495529,0.00008780031,0.00034391857,8.3266866e-7,0.00038794058,0.000042278727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004679846,0.00018343287,0.000038180693,0.00034432934,0.0007271919,0.000016668511,0.001201738,0.9407583,0.05242662,0.00016035377,0.00050247984,0.003593897],"study_design_scores_gemma":[0.0010605599,0.0001494399,0.00014210229,0.00028283623,0.00005618714,0.000047097747,0.00022856722,0.9949475,0.0021585396,0.000004711846,0.000631056,0.00029142658],"about_ca_topic_score_codex":0.00028926475,"about_ca_topic_score_gemma":0.00017724877,"teacher_disagreement_score":0.8978645,"about_ca_system_score_codex":0.00019695921,"about_ca_system_score_gemma":0.0000380633,"threshold_uncertainty_score":0.9999524},"labels":[],"label_agreement":null},{"id":"W2770372302","doi":"10.1109/tpwrs.2017.2772044","title":"Management of Cascading Outage Risk Based on Risk Gradient and Markovian Tree Search","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cascading failure; Electric power system; Risk management; Computer science; Convergence (economics); Reliability engineering; Mathematical optimization; Linearization; Reduction (mathematics); Tree (set theory); Power (physics); Engineering; Mathematics; Nonlinear system","score_opus":0.008883866816628784,"score_gpt":0.21723417960548583,"score_spread":0.20835031278885704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2770372302","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050405167,0.00014137893,0.9339434,0.00001619848,0.0021868313,0.00075984007,0.00013645625,0.00019346875,0.01221728],"genre_scores_gemma":[0.99863374,0.00023424784,0.00041065874,0.000002739168,0.000010546939,0.00007759067,0.0000017917732,0.000062561034,0.0005661065],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983919,0.00014534347,0.00040907387,0.00032813026,0.00039110344,0.00033443238],"domain_scores_gemma":[0.9986549,0.00009778397,0.00016826119,0.00089888944,0.000048136604,0.00013199821],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005890586,0.00025579226,0.00032334749,0.00035560867,0.00040997076,0.00013924832,0.0002609004,0.00012036702,0.000015897622],"category_scores_gemma":[0.000004565132,0.0002541108,0.00010694614,0.0001563289,0.000046026016,0.00015740714,0.000001822413,0.00030599453,0.000023712017],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007547113,0.0001220939,0.0009872838,0.00054778665,0.0003882224,0.000039318827,0.0005952332,0.9902343,0.00013637276,0.00008255438,0.00015371438,0.006637607],"study_design_scores_gemma":[0.0014640568,0.00033329704,0.004955683,0.0007075357,0.00018557507,0.000013520482,0.00028600078,0.9876365,0.0035243577,0.0000032137675,0.0004877547,0.00040248063],"about_ca_topic_score_codex":0.0003777337,"about_ca_topic_score_gemma":0.00005118977,"teacher_disagreement_score":0.9482286,"about_ca_system_score_codex":0.00019549472,"about_ca_system_score_gemma":0.00001091453,"threshold_uncertainty_score":0.9999911},"labels":[],"label_agreement":null},{"id":"W2776971034","doi":"10.1109/tpwrs.2017.2787752","title":"Line-Wise Power Flow and Voltage Collapse","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Jacobian matrix and determinant; Electric power system; Slack bus; AC power; Power-flow study; Control theory (sociology); Power Balance; Newton's method; Voltage; Computation; Power (physics); Computer science; Mathematics; Algorithm; Engineering; Applied mathematics; Electrical engineering; Nonlinear system; Physics","score_opus":0.011240692324248644,"score_gpt":0.22466585732363112,"score_spread":0.21342516499938247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2776971034","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08319154,0.0003823881,0.89837176,0.00007777695,0.0087138275,0.0005399016,0.0006164178,0.0005630222,0.0075433976],"genre_scores_gemma":[0.998634,0.00004935496,0.000103378894,0.000013827837,0.000028938373,0.000067460474,0.0000060226066,0.000062217456,0.0010348313],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876124,0.000022985123,0.0003166849,0.00030221618,0.00024391734,0.00035297862],"domain_scores_gemma":[0.9988158,0.000039493298,0.00006329985,0.00080582267,0.000079570484,0.00019605731],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017394913,0.000285905,0.00029551625,0.000117226715,0.00042801868,0.00036236364,0.0002496063,0.00019947447,0.00009810882],"category_scores_gemma":[0.000009473862,0.00029597484,0.00010208907,0.00008242557,0.00008789201,0.00041107615,0.0000021352298,0.00028846486,0.0002972315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005150683,0.0010173965,0.00043911606,0.0011252686,0.0014784152,0.0004053861,0.0034530526,0.86431146,0.068343945,0.0008902087,0.05103757,0.00698312],"study_design_scores_gemma":[0.0073246984,0.0017629127,0.0042201956,0.0011972621,0.00041694494,0.00042737307,0.0011357057,0.7349185,0.060271922,0.00007029732,0.18442443,0.0038297833],"about_ca_topic_score_codex":0.00006006848,"about_ca_topic_score_gemma":0.000030535066,"teacher_disagreement_score":0.9154424,"about_ca_system_score_codex":0.00013070439,"about_ca_system_score_gemma":0.000020233758,"threshold_uncertainty_score":0.9999492},"labels":[],"label_agreement":null},{"id":"W2781412979","doi":"10.1109/tpwrs.2017.2786702","title":"Control Approach for the Multi-Terminal HVDC System for the Accurate Power Sharing","year":2017,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Voltage droop; Controller (irrigation); Control theory (sociology); Converters; Electric power system; Computer science; Engineering; Terminal (telecommunication); MATLAB; Power (physics); Voltage source; Electronic engineering; Voltage; Control (management); Electrical engineering; Telecommunications","score_opus":0.034728523043786395,"score_gpt":0.2657163932005006,"score_spread":0.2309878701567142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2781412979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00071797956,0.00045252987,0.98263234,0.00007612156,0.010006256,0.0050559924,0.00027008157,0.00035171895,0.00043699474],"genre_scores_gemma":[0.99221957,0.000007870938,0.00021992163,0.000012307263,0.00016021829,0.006284293,0.0000016933245,0.00009510906,0.0009990396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839467,0.00004183654,0.00051440625,0.0003711679,0.00022715864,0.0004507581],"domain_scores_gemma":[0.9980873,0.00032055873,0.00019453709,0.0011788799,0.00013520502,0.00008350956],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.0009140802,0.00032617385,0.00037992114,0.00007665219,0.0019855292,0.00068000326,0.00073087664,0.00020674127,0.0000049802284],"category_scores_gemma":[0.000013751505,0.0001999128,0.00034472198,0.000064250366,0.00006221701,0.00029034627,0.0000020512705,0.00030042246,0.000022218794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032810375,0.00012451744,0.000020864969,0.0015271559,0.0013584968,0.0000044205544,0.0013565876,0.9879163,0.0034738914,0.0006673705,0.0007456043,0.0024767057],"study_design_scores_gemma":[0.0020381445,0.00010789089,0.000098558965,0.00018393777,0.00017185537,0.000090188936,0.0013577921,0.98221904,0.00097343256,0.0000010229833,0.012463258,0.0002948908],"about_ca_topic_score_codex":0.00028659304,"about_ca_topic_score_gemma":0.000038986476,"teacher_disagreement_score":0.99150157,"about_ca_system_score_codex":0.00016853443,"about_ca_system_score_gemma":0.000019281864,"threshold_uncertainty_score":0.9993138},"labels":[],"label_agreement":null},{"id":"W2783167261","doi":"10.1109/tpwrs.2018.2792938","title":"A Distributionally Robust Chance-Constrained MILP Model for Multistage Distribution System Planning With Uncertain Renewables and Loads","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":160,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Robustness (evolution); Linearization; Robust optimization; Linear programming; Computer science; Ambiguity; Integer programming; Conic section; AC power; Electric power system; Stochastic programming; Mathematics; Power (physics); Nonlinear system","score_opus":0.018378890410211433,"score_gpt":0.22398101404866336,"score_spread":0.20560212363845193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783167261","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027900409,0.00018773017,0.96071815,0.000031014744,0.0010645135,0.000983902,0.008206107,0.00066468545,0.00024348896],"genre_scores_gemma":[0.9973487,0.000006826189,0.0014428945,0.000007693191,0.00005586202,0.00044000082,0.00044537924,0.00006330291,0.00018932678],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981309,0.000039047736,0.00047149442,0.00047514736,0.00033189743,0.0005515044],"domain_scores_gemma":[0.9990091,0.00009534983,0.0000964799,0.00032991936,0.00027435663,0.00019479233],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002855091,0.00040782566,0.00039599047,0.000109175155,0.00042810032,0.0001639935,0.00015877878,0.00022400281,0.000005892425],"category_scores_gemma":[0.00000700861,0.00038941336,0.00009351233,0.00028049506,0.00019164082,0.00029684135,0.0000017077003,0.00016999009,0.0000093420895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029375366,0.000060242648,0.000017524017,0.0004265261,0.00015994423,0.000008218722,0.00027460445,0.99445003,0.002270579,0.00084226567,0.0010973903,0.000098934725],"study_design_scores_gemma":[0.0013097007,0.0003985277,0.00003330412,0.00064279314,0.00008792369,0.00009123687,0.00056647195,0.99217564,0.0033790534,0.0000058373284,0.000845802,0.00046372655],"about_ca_topic_score_codex":0.000055081375,"about_ca_topic_score_gemma":0.000058691778,"teacher_disagreement_score":0.9694483,"about_ca_system_score_codex":0.0006042895,"about_ca_system_score_gemma":0.00007529787,"threshold_uncertainty_score":0.99985576},"labels":[],"label_agreement":null},{"id":"W2790780473","doi":"10.1109/tpwrs.2018.2805322","title":"An Incentive-Based Multistage Expansion Planning Model for Smart Distribution Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"King Saud University","keywords":"Incentive; Distributed generation; Software deployment; Profit (economics); Payback period; Bidding; Linearization; Electric power system; Investment (military); Operations research; Computer science; Environmental economics; Business; Finance; Economics; Microeconomics; Renewable energy; Engineering; Power (physics); Electrical engineering","score_opus":0.01739433024462106,"score_gpt":0.25074176357628625,"score_spread":0.2333474333316652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2790780473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011674029,0.00016551733,0.9790483,0.0000055496857,0.0057445504,0.0014925032,0.00064362795,0.001016948,0.00020893438],"genre_scores_gemma":[0.99809456,0.000004082718,0.0006922362,0.000011720662,0.00005446141,0.00058927905,0.00014699427,0.000113077615,0.0002935769],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979379,0.000115136856,0.0006149265,0.0004522882,0.00036303574,0.00051671936],"domain_scores_gemma":[0.9987369,0.0000985976,0.000120712095,0.0005673485,0.00029293622,0.0001835004],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00038701174,0.00035903012,0.00037737566,0.0002465742,0.0003682281,0.00019159038,0.00022586892,0.00027275004,0.0000063175235],"category_scores_gemma":[0.000005698371,0.00038013706,0.000116789946,0.00038458584,0.00004559191,0.0004378483,5.706426e-7,0.00019779585,0.000037777496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008675435,0.00010979047,0.000017669423,0.00020384276,0.00005497958,0.000002128259,0.0004892349,0.9930778,0.005035472,0.000077699515,0.0007656461,0.000078993224],"study_design_scores_gemma":[0.00090004597,0.00036053994,0.00001435387,0.00034292377,0.0000449346,0.00000803134,0.00016670619,0.98885286,0.007986071,0.0000016278457,0.0009212316,0.0004006981],"about_ca_topic_score_codex":0.00008324592,"about_ca_topic_score_gemma":0.000015019685,"teacher_disagreement_score":0.9864206,"about_ca_system_score_codex":0.0005456717,"about_ca_system_score_gemma":0.000068563495,"threshold_uncertainty_score":0.99986506},"labels":[],"label_agreement":null},{"id":"W2791916581","doi":"10.1109/tpwrs.2018.2815534","title":"A Computationally Efficient Method to Design Probabilistically Robust Wide-Area PSSs for Damping Inter-Area Oscillations in Wind-Integrated Power Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"National Natural Science Foundation of China","keywords":"Robustness (evolution); Probability density function; Electric power system; Probabilistic logic; Control theory (sociology); Wind power; Mathematical optimization; Random variable; Gaussian; Probability distribution; Cumulative distribution function; Computer science; Engineering; Power (physics); Mathematics; Control (management)","score_opus":0.03859205442077294,"score_gpt":0.2661661103519612,"score_spread":0.22757405593118826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791916581","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015699285,0.000039188213,0.987117,0.00008998054,0.004657626,0.004133024,0.00038168413,0.00065753993,0.0013540193],"genre_scores_gemma":[0.96554863,7.630169e-7,0.03331645,0.00005793249,0.000009068122,0.00069120346,0.000020278176,0.000099466706,0.00025620265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963439,0.0004763663,0.0013319748,0.00073703984,0.00048228426,0.00062843546],"domain_scores_gemma":[0.99695903,0.001127283,0.00012721194,0.0005928832,0.000875038,0.00031854055],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0015735794,0.0005025402,0.00071392243,0.0006877544,0.0002766507,0.00030195795,0.00033754346,0.00027329207,0.00011482656],"category_scores_gemma":[0.00011604213,0.00048591103,0.00018826783,0.0011481026,0.000078362784,0.00017655542,0.0000037017205,0.00029638715,0.00009892348],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012968208,0.00020226123,0.0000436589,0.00016015279,0.00009380035,0.000002761543,0.0019570792,0.99584293,0.00029285514,0.00039510362,0.00085686217,0.000022851389],"study_design_scores_gemma":[0.00080092537,0.0003706705,0.0001369359,0.0006244546,0.000037608163,0.000029405719,0.0008534611,0.99265945,0.00016432059,0.000010795423,0.0037936233,0.0005183722],"about_ca_topic_score_codex":0.000106389205,"about_ca_topic_score_gemma":0.0001197761,"teacher_disagreement_score":0.9639787,"about_ca_system_score_codex":0.0008902005,"about_ca_system_score_gemma":0.000191398,"threshold_uncertainty_score":0.99975926},"labels":[],"label_agreement":null},{"id":"W2792331020","doi":"10.1109/tpwrs.2018.2809548","title":"Power System Coherency Identification Under High Depth of Penetration of Wind Power","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Electric power system; Salient; Wind power; Computer science; Control theory (sociology); Power (physics); Wind speed; Power system simulation; Engineering; Electrical engineering; Physics","score_opus":0.01095656186536516,"score_gpt":0.21927205291747623,"score_spread":0.20831549105211106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792331020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12060542,0.00012060103,0.8597506,0.000009767535,0.00623581,0.00070020824,0.00014626118,0.00028714872,0.012144178],"genre_scores_gemma":[0.99934614,0.0000057783154,0.00011508071,0.00000535018,0.000010024999,0.00004241255,0.000008643634,0.000056347635,0.00041024285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9974786,0.00018640416,0.001209381,0.00034694417,0.0005133287,0.00026532178],"domain_scores_gemma":[0.99823076,0.00007677786,0.00028572322,0.0007850985,0.0005086053,0.00011304796],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005152235,0.00028377277,0.00049233955,0.00032002354,0.00010749423,0.00005360285,0.00024423146,0.00024783882,0.000322744],"category_scores_gemma":[0.000006103891,0.00028395024,0.00015903826,0.00054346776,0.00012011897,0.00029962687,0.0000013293242,0.00015699342,0.000118196214],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034348568,0.0011926895,0.0008525662,0.0027801653,0.0012602666,0.000005380843,0.008403671,0.84481186,0.12472837,0.013363022,0.0020849172,0.00017362181],"study_design_scores_gemma":[0.00887144,0.004174891,0.06723955,0.004140905,0.0007726991,0.0002514584,0.023361366,0.24387021,0.63759154,0.0001346755,0.005071521,0.004519746],"about_ca_topic_score_codex":0.000114437644,"about_ca_topic_score_gemma":0.00006706705,"teacher_disagreement_score":0.8787407,"about_ca_system_score_codex":0.00023176664,"about_ca_system_score_gemma":0.000061006387,"threshold_uncertainty_score":0.99996126},"labels":[],"label_agreement":null},{"id":"W2793107922","doi":"10.1109/tpwrs.2018.2810161","title":"Attack Detection and Identification for Automatic Generation Control Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":213,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Automatic Generation Control; Electric power system; Identification (biology); Residual; Computer science; Observer (physics); Function (biology); Real-time computing; Engineering; Reliability engineering; Power (physics); Control theory (sociology); Control (management); Algorithm; Artificial intelligence","score_opus":0.01528892193492103,"score_gpt":0.23270315413809237,"score_spread":0.21741423220317133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2793107922","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16167806,0.00025381273,0.8276225,0.000011838306,0.009296728,0.00075021107,0.000038307655,0.00028200424,0.000066576504],"genre_scores_gemma":[0.99922234,0.000019178773,0.000026927812,0.00000941004,0.00014935814,0.00036846113,0.0000020716623,0.00002631819,0.00017591557],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991056,0.00004907615,0.0003228055,0.00020208287,0.00014810063,0.00017235137],"domain_scores_gemma":[0.9995128,0.000064489104,0.000050371964,0.00020575266,0.000103648286,0.00006293158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023575549,0.00013589884,0.00016316165,0.00013389236,0.00026708472,0.0001526352,0.00006443398,0.00012429325,0.0000057855527],"category_scores_gemma":[0.0000043856903,0.00013249976,0.00004678051,0.00013018047,0.00004838584,0.00021110359,1.9713654e-7,0.00008425654,0.00005814015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004822791,0.00009942996,0.000011060502,0.0008530306,0.00025096035,0.0000013446939,0.0020288744,0.67508394,0.3165673,0.00016215783,0.0019090304,0.0029846614],"study_design_scores_gemma":[0.00042033967,0.00013868675,0.000076544486,0.0000562159,0.000039368417,0.000028113282,0.00014914664,0.9744427,0.022231285,0.000001592103,0.0022656173,0.00015038202],"about_ca_topic_score_codex":0.000026319682,"about_ca_topic_score_gemma":0.00006167418,"teacher_disagreement_score":0.83754426,"about_ca_system_score_codex":0.000078555815,"about_ca_system_score_gemma":0.0000090579215,"threshold_uncertainty_score":0.5403183},"labels":[],"label_agreement":null},{"id":"W2793551652","doi":"10.1109/tpwrs.2018.2808819","title":"Measurement-Based Sparsity-Promoting Optimal Control of Line Flows","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Science Foundation of Sri Lanka; Natural Sciences and Engineering Research Council of Canada","keywords":"Linear-quadratic-Gaussian control; Control theory (sociology); Linear-quadratic regulator; Kalman filter; Controller (irrigation); Optimal control; Offset (computer science); AC power; Electric power system; Engineering; Control engineering; Computer science; Power (physics); Mathematical optimization; Control (management); Voltage; Mathematics","score_opus":0.01814323899018033,"score_gpt":0.2144696031542058,"score_spread":0.19632636416402546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2793551652","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012501229,0.00015877512,0.98128563,0.00002566924,0.0036904002,0.00052268803,0.000092807735,0.00038540576,0.0013374232],"genre_scores_gemma":[0.9993711,0.0000016812367,0.00046053485,0.000019259613,0.000018823599,0.00004430363,0.0000012523815,0.00004114301,0.000041887022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982291,0.00013387454,0.0006058975,0.00025018526,0.0004894811,0.00029147143],"domain_scores_gemma":[0.9988662,0.00004453318,0.0000884798,0.00046748962,0.00040203118,0.0001312725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007188762,0.0002295491,0.00039643253,0.00018504301,0.00012177758,0.00004048497,0.00018199945,0.00013360001,0.00014478022],"category_scores_gemma":[0.000012365764,0.00022892478,0.0001506241,0.0002904665,0.000059147435,0.00011706707,5.060936e-7,0.00016700015,0.00007912142],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000749791,0.0001691366,0.00004030877,0.00024928554,0.0001546487,0.0000018899195,0.0005055984,0.9893098,0.009249084,0.0000134973225,0.000104788756,0.00012702157],"study_design_scores_gemma":[0.0012807756,0.0002845178,0.00002902008,0.00023229128,0.000049373586,0.000005566173,0.00010663903,0.963033,0.033307426,4.2407123e-7,0.0014308366,0.00024011004],"about_ca_topic_score_codex":0.000035924353,"about_ca_topic_score_gemma":0.00005227537,"teacher_disagreement_score":0.9868699,"about_ca_system_score_codex":0.00016488394,"about_ca_system_score_gemma":0.000052926003,"threshold_uncertainty_score":0.9335282},"labels":[],"label_agreement":null},{"id":"W2793796704","doi":"10.1109/tpwrs.2018.2819942","title":"Effective Dynamic Scheduling of Reconfigurable Microgrids","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Microgrid; Islanding; Dispatchable generation; Control reconfiguration; Scheduling (production processes); Schedule; Computer science; Grid; Distributed generation; Reliability engineering; Reliability (semiconductor); Mathematical optimization; Engineering; Control engineering; Distributed computing; Power (physics); Renewable energy; Embedded system; Control (management)","score_opus":0.0036578876038840446,"score_gpt":0.19607471996261816,"score_spread":0.1924168323587341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2793796704","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037247777,0.00097269425,0.9546293,0.00000913013,0.0037360962,0.00044199236,0.00004243945,0.0002606086,0.002659969],"genre_scores_gemma":[0.9991844,0.00008690628,0.00040762124,0.000008804451,0.000022677043,0.000066141925,0.00000201898,0.00003754673,0.00018386317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920124,0.000038493235,0.00028699538,0.00016603775,0.00010315467,0.00020409019],"domain_scores_gemma":[0.99950826,0.00005011406,0.00004575299,0.00022967411,0.00011361437,0.000052584164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013286824,0.00015601117,0.00023335064,0.00016337284,0.00007921738,0.000031453277,0.00009918239,0.000110548564,0.00009342687],"category_scores_gemma":[0.0000017690043,0.00015533446,0.00009219248,0.0002264165,0.00004730391,0.00011312544,2.1346794e-7,0.0001416224,0.00012705119],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057534624,0.00007398904,0.0000055710257,0.00014933561,0.0002456823,0.0000016059151,0.0005843798,0.8651008,0.12457456,0.000013814872,0.00013390955,0.009058811],"study_design_scores_gemma":[0.00090293144,0.00035644876,0.000054712298,0.00028536678,0.00006921952,0.000027881077,0.00020750154,0.801391,0.1937452,0.000007237306,0.0026190942,0.00033341013],"about_ca_topic_score_codex":0.00003876599,"about_ca_topic_score_gemma":0.000022842207,"teacher_disagreement_score":0.96193665,"about_ca_system_score_codex":0.00008156032,"about_ca_system_score_gemma":0.000012646916,"threshold_uncertainty_score":0.63343555},"labels":[],"label_agreement":null},{"id":"W2794121694","doi":"10.1109/tpwrs.2018.2798540","title":"Optimizing DER Participation in Inertial and Primary-Frequency Response","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Advanced Research Projects Agency - Energy; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Voltage droop; Distributed generation; Frequency domain; Frequency response; Automatic frequency control; Overshoot (microwave communication); Control theory (sociology); Frequency regulation; Electric power system; Computer science; Engineering; Power (physics); Control engineering; Telecommunications; Voltage; Voltage regulator; Electrical engineering","score_opus":0.012021369212107759,"score_gpt":0.24098135803296175,"score_spread":0.228959988820854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794121694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23986927,0.00016130638,0.7550892,0.00003808471,0.0018926801,0.0003242204,0.000016045049,0.00023366908,0.002375533],"genre_scores_gemma":[0.99914914,0.000010213174,0.00052830955,0.000032086995,0.000009450465,0.00010395411,0.0000013504161,0.000031237454,0.0001342799],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998683,0.00020384506,0.00044221902,0.0002387112,0.00017437675,0.0002578725],"domain_scores_gemma":[0.9994048,0.000100272875,0.000034723955,0.00028651473,0.00006876042,0.00010493061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004958549,0.00017257128,0.00022826818,0.00023159884,0.00009295752,0.00006876033,0.00007823356,0.00012547457,0.00006895927],"category_scores_gemma":[0.000011993315,0.00017476424,0.000038640712,0.00030338572,0.00006197094,0.00025021296,8.063916e-7,0.00015121783,0.00004585667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014640052,0.00057144184,0.001437668,0.0005332013,0.00023241178,0.000034783847,0.024882635,0.91125154,0.057755,0.0003051606,0.0005900537,0.0009420708],"study_design_scores_gemma":[0.0056234933,0.001250697,0.021737766,0.0008193407,0.00011667951,0.000112625545,0.0013350245,0.93166655,0.02844059,0.000030130284,0.0068532047,0.0020138926],"about_ca_topic_score_codex":0.000058957125,"about_ca_topic_score_gemma":0.00012500239,"teacher_disagreement_score":0.75927985,"about_ca_system_score_codex":0.00020097502,"about_ca_system_score_gemma":0.000031134674,"threshold_uncertainty_score":0.7126679},"labels":[],"label_agreement":null},{"id":"W2794352985","doi":"10.1109/tpwrs.2018.2811707","title":"A Cumulant-Tensor-Based Probabilistic Load Flow Method","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Monte Carlo method; Electric power system; Mathematical optimization; Computer science; Wind power; Grid; Random variable; Reliability engineering; Tensor (intrinsic definition); Power (physics); Engineering; Mathematics; Electrical engineering; Statistics","score_opus":0.013635294617494569,"score_gpt":0.24062256037396546,"score_spread":0.22698726575647088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794352985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019547874,0.00014746572,0.9810913,0.00005892052,0.008934624,0.0007894892,0.00012639046,0.0009782205,0.0059187636],"genre_scores_gemma":[0.9950842,0.000004979183,0.0034163191,0.0000737339,0.00006333984,0.00026135927,0.0000017588068,0.00007535524,0.0010189132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978649,0.00016949857,0.0005430069,0.00045416135,0.00043250332,0.0005359285],"domain_scores_gemma":[0.9984408,0.00020289092,0.000055594734,0.00082062377,0.00028416686,0.00019591741],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00062553794,0.00035276255,0.0004550037,0.00015802844,0.00016671786,0.000085583495,0.00027926217,0.00021925021,0.00014813896],"category_scores_gemma":[0.00002136654,0.00032117986,0.00020118743,0.00037453306,0.000109211345,0.00013796556,8.3606403e-7,0.0003029758,0.00091121864],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011871696,0.0002255556,0.000005919044,0.0007342962,0.00018465279,0.00002345568,0.0010184794,0.98864746,0.0029717823,0.0001949948,0.004939499,0.0009352035],"study_design_scores_gemma":[0.0008566055,0.00037277272,0.000016702394,0.0004993388,0.00006720938,0.000081844206,0.00013707596,0.92957795,0.008772476,0.00003555168,0.05901157,0.000570893],"about_ca_topic_score_codex":0.00013970076,"about_ca_topic_score_gemma":0.00010601496,"teacher_disagreement_score":0.99312943,"about_ca_system_score_codex":0.00042946523,"about_ca_system_score_gemma":0.00010730408,"threshold_uncertainty_score":0.999924},"labels":[],"label_agreement":null},{"id":"W2794507726","doi":"10.1109/tpwrs.2018.2820059","title":"A Generic Modeling and Power-Flow Analysis Approach for Isochronous and Droop-Controlled Microgrids","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; University of Waterloo","funders":"","keywords":"Voltage droop; Microgrid; Control theory (sociology); AC power; Transformer; Computer science; Electric power system; Distributed generation; Power flow; Voltage; Engineering; Power (physics); Voltage source; Control (management)","score_opus":0.007800210083724152,"score_gpt":0.19341678766503959,"score_spread":0.18561657758131545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794507726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017356394,0.0038505387,0.9767896,0.000012540675,0.00064451655,0.00080538745,0.00007073101,0.00020928521,0.00026098595],"genre_scores_gemma":[0.99194545,0.00022911144,0.0073126503,0.000024093477,0.000047258756,0.00028718606,0.000009357157,0.00004685182,0.00009802883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99884254,0.000035135894,0.0003742705,0.000339828,0.000115004084,0.0002932493],"domain_scores_gemma":[0.9994587,0.000040497565,0.00004465315,0.00023661043,0.00011137592,0.00010819544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020078839,0.00025035563,0.00053202594,0.00034186227,0.00021082434,0.00014846481,0.000078867844,0.00014661647,0.000014790268],"category_scores_gemma":[0.0000018794192,0.00023211766,0.00018205575,0.00034639527,0.00004335381,0.00012676483,8.9559495e-7,0.00010487661,0.0000034132477],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013861293,0.0000488457,0.000004413889,0.000058095287,0.0010625516,4.6167636e-7,0.0005479017,0.9944638,0.002056847,0.0000047321532,0.000051871368,0.0015618359],"study_design_scores_gemma":[0.002450294,0.00015308177,0.0000040149134,0.000013578843,0.00061879086,0.000015005069,0.00017185583,0.99578667,0.00032005474,0.0000020056555,0.00021837527,0.0002462865],"about_ca_topic_score_codex":0.00003860072,"about_ca_topic_score_gemma":0.000021085292,"teacher_disagreement_score":0.97458905,"about_ca_system_score_codex":0.000055179808,"about_ca_system_score_gemma":0.000013763244,"threshold_uncertainty_score":0.94654834},"labels":[],"label_agreement":null},{"id":"W2799921325","doi":"10.1109/tpwrs.2018.2834913","title":"A Dynamical Systems Approach to Modeling and Analysis of Transactive Energy Coordination","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; National Science Foundation","keywords":"Transactive memory; Population; Grid; Computer science; Synchronization (alternating current); Distributed generation; Mathematical optimization; Distributed computing; Engineering; Mathematics; Renewable energy","score_opus":0.010237031135766165,"score_gpt":0.20365302260493903,"score_spread":0.19341599146917288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2799921325","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033085223,0.0000933113,0.9612338,0.000009055086,0.0015200535,0.00023755708,0.00005693345,0.00019777333,0.0035663121],"genre_scores_gemma":[0.9992399,0.00001156516,0.0002825951,0.000009401801,0.000021379376,0.00017386202,0.00000693026,0.00004255327,0.00021178728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986359,0.00006674023,0.00042680453,0.00032690231,0.00030421058,0.00023943112],"domain_scores_gemma":[0.9993371,0.000039949166,0.000038755436,0.00033832062,0.00012328275,0.00012258676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001898679,0.00022046751,0.00044402905,0.00094151095,0.00007964399,0.00005358845,0.0001318812,0.00011716992,0.000006797176],"category_scores_gemma":[0.0000012155479,0.00022550781,0.00012090071,0.0011426815,0.00003784804,0.00013169277,9.84187e-7,0.00009524059,0.0000048387624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024968764,0.00007064471,0.0000033577758,0.00006502815,0.0013962897,5.3819e-7,0.00064973504,0.99592495,0.00081036997,0.0008481023,0.000045823945,0.00016017642],"study_design_scores_gemma":[0.00020917105,0.00009788856,0.000027552025,0.00004516733,0.0004907045,0.0000035742914,0.0005280044,0.9975003,0.00058094686,0.000001688495,0.00030188216,0.00021313032],"about_ca_topic_score_codex":0.0005741826,"about_ca_topic_score_gemma":0.000073675976,"teacher_disagreement_score":0.9661547,"about_ca_system_score_codex":0.00016941328,"about_ca_system_score_gemma":0.000008072579,"threshold_uncertainty_score":0.91959417},"labels":[],"label_agreement":null},{"id":"W2807887237","doi":"10.1109/tpwrs.2018.2848207","title":"A Fuzzy Adaptive Probabilistic Wind Power Prediction Framework Using Diffusion Kernel Density Estimators","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":124,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Estimator; Kernel density estimation; Wind power; Computer science; Probabilistic logic; Wind power forecasting; Probability density function; Electric power system; Mathematical optimization; Prediction interval; Kernel (algebra); Engineering; Power (physics); Machine learning; Mathematics; Artificial intelligence; Statistics","score_opus":0.01651968419172244,"score_gpt":0.2222424718126623,"score_spread":0.20572278762093985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2807887237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40151128,0.00006502683,0.588468,0.0000033776093,0.006974993,0.00026993066,0.00005088052,0.00050703716,0.0021494809],"genre_scores_gemma":[0.99814695,0.0000058286378,0.001438232,0.00001843114,0.00012997878,0.000024560159,0.000002713403,0.00009802035,0.00013531219],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981684,0.000078800105,0.0004809015,0.0004191202,0.0003794984,0.00047325765],"domain_scores_gemma":[0.99898195,0.00013141497,0.000085219304,0.00045399967,0.00014772784,0.00019967146],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020266903,0.0003819528,0.0003475646,0.0002322847,0.00040387077,0.00010077273,0.00015991954,0.0003477468,0.00006736072],"category_scores_gemma":[0.000015016854,0.00037563665,0.00014282145,0.00044505345,0.00012780381,0.00026587606,0.0000025472998,0.000494906,0.00010593697],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000142303,0.0002198844,0.0004550547,0.00013871414,0.00027414874,0.00002601449,0.0038804305,0.98725104,0.006156486,0.0008646302,0.00022812623,0.00036319057],"study_design_scores_gemma":[0.0008998715,0.0008773489,0.0011385215,0.002409677,0.00020586667,0.00030722958,0.00079076824,0.9836498,0.0069154906,0.0005118587,0.0011530307,0.0011405557],"about_ca_topic_score_codex":0.0001563725,"about_ca_topic_score_gemma":0.000039890012,"teacher_disagreement_score":0.59663564,"about_ca_system_score_codex":0.0003127761,"about_ca_system_score_gemma":0.00004169085,"threshold_uncertainty_score":0.9998696},"labels":[],"label_agreement":null},{"id":"W2863213238","doi":"10.1109/tpwrs.2018.2854648","title":"Investigations of Large-Scale Voltage-Dependent Loads for Damping Inter-Area Oscillations: Mechanism and Robust Decentralized Control","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"National Natural Science Foundation of China","keywords":"Control theory (sociology); Robustness (evolution); Electric power system; Decentralised system; Engineering; Control engineering; Computer science; Power (physics); Control (management); Physics","score_opus":0.01652859012387287,"score_gpt":0.22970412544451452,"score_spread":0.21317553532064165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2863213238","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008695206,0.00014018134,0.98580277,0.00004492752,0.0028200678,0.0011488246,0.00062300556,0.0002821737,0.0004428425],"genre_scores_gemma":[0.9978636,0.000020934829,0.0016103783,0.000036404726,0.000010480985,0.00021335864,0.000008211793,0.00004321993,0.0001933911],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984876,0.00007893129,0.0006386261,0.00029072305,0.00020470234,0.00029943074],"domain_scores_gemma":[0.998945,0.00015527113,0.00010335494,0.00036783452,0.00026645654,0.00016208274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042472585,0.00022389424,0.00038539563,0.000206104,0.0002259719,0.00007391512,0.00012547635,0.00015355514,0.00009094725],"category_scores_gemma":[0.000019927827,0.00022655439,0.00011162533,0.000224134,0.000085343185,0.00020815604,0.000001357571,0.000116358206,0.000010398403],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022379821,0.0004641265,0.000528459,0.0010975663,0.00079012034,0.0000017808492,0.010021571,0.95794505,0.021345496,0.0057544974,0.0016866341,0.00014087344],"study_design_scores_gemma":[0.0026231096,0.00021210602,0.000043004296,0.00027117704,0.0001078841,0.000019448078,0.0012484286,0.98083264,0.011673492,0.00013471735,0.0024691855,0.00036480866],"about_ca_topic_score_codex":0.000033938322,"about_ca_topic_score_gemma":0.00023120007,"teacher_disagreement_score":0.9891684,"about_ca_system_score_codex":0.000115299874,"about_ca_system_score_gemma":0.000037845493,"threshold_uncertainty_score":0.923862},"labels":[],"label_agreement":null},{"id":"W2883477413","doi":"10.1109/tpwrs.2018.2856283","title":"Eliciting Multi-Dimensional Flexibilities From Electric Vehicles: A Mechanism Design Approach","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Flexibility (engineering); Computer science; Benchmark (surveying); Dual (grammatical number); Mechanism design; Implementation; Mechanism (biology); Mathematical optimization; Electric power system; Power (physics); Economics; Microeconomics; Mathematics","score_opus":0.018728752873823744,"score_gpt":0.21374773666706043,"score_spread":0.19501898379323668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883477413","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08326903,0.00034253224,0.9130534,0.000007549365,0.0014811234,0.00040740744,0.000045011937,0.00061268173,0.00078126776],"genre_scores_gemma":[0.99150145,0.000012330521,0.0077640126,0.00007801072,0.00013516202,0.000087911125,0.000004025751,0.00008240558,0.00033469294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983242,0.00009991597,0.0004028789,0.00038102604,0.00031955497,0.0004723979],"domain_scores_gemma":[0.99923134,0.00013157669,0.000051617237,0.00035443535,0.00010497183,0.00012607205],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019437322,0.00031633646,0.00031302558,0.00022726317,0.0002612522,0.000089624235,0.0002007388,0.00024048828,0.00014772337],"category_scores_gemma":[0.000003540236,0.0002965324,0.00011749838,0.00043117115,0.00003836529,0.00017183147,0.0000010282495,0.00041589767,0.00017497485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013562985,0.0002773698,0.0000059105314,0.0001444618,0.00065459835,0.000012350255,0.0034627838,0.6185085,0.3646825,0.00040528178,0.004971916,0.00673867],"study_design_scores_gemma":[0.00053944875,0.0002517475,0.000017143655,0.0000669501,0.000039054386,0.0000383126,0.00032191921,0.8366903,0.16097152,0.00024234624,0.00044453677,0.0003767032],"about_ca_topic_score_codex":0.00016874602,"about_ca_topic_score_gemma":0.000004730645,"teacher_disagreement_score":0.9082324,"about_ca_system_score_codex":0.000180362,"about_ca_system_score_gemma":0.000041436342,"threshold_uncertainty_score":0.9999487},"labels":[],"label_agreement":null},{"id":"W2884499918","doi":"10.1109/tpwrs.2018.2857698","title":"Stochastic Transmission Expansion Planning Considering Uncertain Dynamic Thermal Rating of Overhead Lines","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Thermal Analysis in Power Transmission","field":"Engineering","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Overhead (engineering); Overhead line; Electric power transmission; Reliability engineering; Reliability (semiconductor); Grid; Engineering; Transmission line; Electric power system; Smart grid; Computer science; Mathematical optimization; Power (physics); Electrical engineering","score_opus":0.015264688095658672,"score_gpt":0.2555482643468101,"score_spread":0.24028357625115143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2884499918","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2571387,0.0006277545,0.7399124,0.000013653089,0.0013096993,0.00025565916,0.000020245383,0.0003390051,0.00038287957],"genre_scores_gemma":[0.99892163,0.000014693924,0.00075259834,0.000013046162,0.00003193387,0.00003409983,0.0000029901762,0.000093053066,0.00013597426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99794614,0.000106037645,0.00075448275,0.00035204753,0.0004338837,0.00040743357],"domain_scores_gemma":[0.9990771,0.00019809682,0.000107822125,0.00035078914,0.00011319516,0.00015303656],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027421268,0.00037575423,0.00049183646,0.00033441183,0.00023214938,0.000043867025,0.00021964441,0.00020822336,0.00016390438],"category_scores_gemma":[0.0000042806946,0.00033756866,0.00020713218,0.00038478573,0.000115225426,0.00022338105,0.000001261892,0.00035202244,0.00003363966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000745515,0.00005127205,0.0000032270336,0.00013639552,0.00010459988,0.0000061030482,0.0020749476,0.648346,0.34728956,0.00000447362,0.000016903572,0.001891972],"study_design_scores_gemma":[0.0007502264,0.0002548344,0.00006634813,0.0016675827,0.00012840908,0.000035268742,0.00091016555,0.84684145,0.148549,0.000009519411,0.00031497373,0.00047218992],"about_ca_topic_score_codex":0.000050724077,"about_ca_topic_score_gemma":0.0000069915404,"teacher_disagreement_score":0.7417829,"about_ca_system_score_codex":0.00010626797,"about_ca_system_score_gemma":0.000038245602,"threshold_uncertainty_score":0.9999076},"labels":[],"label_agreement":null},{"id":"W2888818189","doi":"10.1109/tpwrs.2018.2867476","title":"A Decentralized Framework for the Optimal Coordination of Distributed Energy Resources","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Robustness (evolution); Computer science; Distributed generation; Column generation; Mathematical optimization; Distributed computing; Computation; Linear programming; Decomposition; Integer programming; Engineering; Mathematics; Algorithm; Renewable energy","score_opus":0.010338845015574994,"score_gpt":0.22288540935908352,"score_spread":0.21254656434350852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888818189","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053782803,0.00020634857,0.98923165,0.00009584836,0.0042908336,0.00025737504,0.000097313794,0.00020427314,0.00023807907],"genre_scores_gemma":[0.9986734,0.000030431924,0.00076421944,0.000017975733,0.000059623864,0.00024017734,0.0000049875034,0.000035245364,0.0001739437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913144,0.000034259316,0.00028045423,0.00014494528,0.00018965243,0.00021925515],"domain_scores_gemma":[0.9992185,0.00025607974,0.000052466905,0.00033527095,0.00009355698,0.000044100932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014795751,0.00014319998,0.00017174287,0.000097272794,0.0001341161,0.00004156459,0.00019340389,0.00009577202,0.000046248482],"category_scores_gemma":[0.0000059404074,0.00011475955,0.00010291145,0.00029071985,0.00006517678,0.000063322994,8.821371e-7,0.00007930782,0.000007545751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007363463,0.0000445584,0.0000027195024,0.000042282674,0.0003007114,4.2155352e-7,0.00033599467,0.98970306,0.00035295478,0.004515117,0.0042116027,0.00041692064],"study_design_scores_gemma":[0.0008490534,0.00027724082,0.00012223021,0.00017595096,0.00015728346,0.0000051432767,0.0007926171,0.6881405,0.027498165,0.00007165325,0.28160688,0.00030324448],"about_ca_topic_score_codex":0.00008854705,"about_ca_topic_score_gemma":0.000028102548,"teacher_disagreement_score":0.99329513,"about_ca_system_score_codex":0.00007919327,"about_ca_system_score_gemma":0.000006572994,"threshold_uncertainty_score":0.46797585},"labels":[],"label_agreement":null},{"id":"W2898006686","doi":"10.1109/tpwrs.2018.2874543","title":"Model-Free Volt-Var Control Based on Measurement Data Analytics","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Metering mode; Capacitor; Computer science; Intuition; Volt; Scheme (mathematics); Voltage; Electric power system; Data modeling; AC power; Reliability engineering; Engineering; Electronic engineering; Power (physics); Electrical engineering","score_opus":0.05031467610467024,"score_gpt":0.23974980843248417,"score_spread":0.18943513232781392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898006686","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004533971,0.00006242485,0.98906684,0.000105661224,0.003563327,0.0005026701,0.0022456895,0.00054778124,0.0034522],"genre_scores_gemma":[0.9991291,0.0000033502326,0.00047436007,0.00009376107,0.000060641614,0.000049801292,0.00003259483,0.000070291666,0.00008608024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99781245,0.000062916384,0.0004454127,0.0004375475,0.00082793663,0.00041373516],"domain_scores_gemma":[0.9973042,0.000047287274,0.000053243566,0.0021566125,0.00026671917,0.00017195896],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005853128,0.00031892248,0.00031812082,0.00020147316,0.00015326092,0.00010166877,0.00068806845,0.00016842425,0.00007404938],"category_scores_gemma":[0.000018662433,0.00032321503,0.000103686754,0.00028814963,0.00006112672,0.00023713092,0.0000020872783,0.00029416438,0.00037799068],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000817673,0.00015079541,0.0000033536214,0.000048516114,0.00014706631,0.000003467708,0.00003314453,0.98205554,0.0014683702,0.00005744554,0.015854713,0.00009580322],"study_design_scores_gemma":[0.0012654554,0.00029169748,0.000014056868,0.00012672754,0.00011919493,0.0000032352236,0.00002296855,0.9914638,0.0019732201,0.000008279634,0.004395878,0.00031552356],"about_ca_topic_score_codex":0.00003953436,"about_ca_topic_score_gemma":0.00007637574,"teacher_disagreement_score":0.9986757,"about_ca_system_score_codex":0.00049294974,"about_ca_system_score_gemma":0.00007478977,"threshold_uncertainty_score":0.999922},"labels":[],"label_agreement":null},{"id":"W2900051974","doi":"10.1109/tpwrs.2018.2879496","title":"Analysis and Enhancement of the Artificial Bus Method for Successful Low-Voltage Ride-Through and Resynchronization","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; University of Toronto","funders":"","keywords":"Converters; Admittance; Grid; Control theory (sociology); Fault (geology); Computer science; Stability (learning theory); Synchronization (alternating current); Voltage source; Power (physics); Voltage; Microgrid; Engineering; Electronic engineering; Topology (electrical circuits); Control (management); Electrical engineering; Mathematics; Artificial intelligence","score_opus":0.006687500717446107,"score_gpt":0.2322141046787338,"score_spread":0.22552660396128768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900051974","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018466573,0.00034610427,0.9797199,0.000026693426,0.0008712566,0.00039893194,0.000056094825,0.000038824444,0.00007567336],"genre_scores_gemma":[0.9981599,0.00008822011,0.001556085,0.0000134317,0.000028550076,0.00005864356,0.0000029158116,0.000015342108,0.000076918324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992884,0.00003798575,0.00028761796,0.0001610299,0.0001035864,0.00012141019],"domain_scores_gemma":[0.99956864,0.00006064468,0.00006258382,0.00018232863,0.00010027586,0.000025542748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016909098,0.00010832299,0.00020400881,0.00009941309,0.00013165733,0.00004346244,0.000058199133,0.0000666532,0.00002547684],"category_scores_gemma":[0.0000035150574,0.000087004155,0.000066092456,0.00036589304,0.000045875342,0.00010391408,8.1825806e-7,0.000050650793,0.0000014484875],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001660231,0.00013765314,0.00016002498,0.00052209815,0.0016983727,4.644797e-7,0.0035498496,0.86286724,0.11546382,0.00028262564,0.00023850639,0.014913292],"study_design_scores_gemma":[0.000371808,0.000088878536,0.00009169297,0.00005425248,0.0004266525,0.00000195632,0.00014136963,0.8157996,0.18198417,0.000026154712,0.00087581587,0.00013768252],"about_ca_topic_score_codex":0.00012678192,"about_ca_topic_score_gemma":0.00021924182,"teacher_disagreement_score":0.9796933,"about_ca_system_score_codex":0.000032374304,"about_ca_system_score_gemma":0.000010032617,"threshold_uncertainty_score":0.35479265},"labels":[],"label_agreement":null},{"id":"W2900475457","doi":"10.1109/tpwrs.2018.2881254","title":"Line-Wise Optimal Power Flow Using Successive Linear Optimization Technique","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electric power system; Mathematical optimization; Power flow; Convergence (economics); Nonlinear system; Linear programming; Power (physics); Line (geometry); Computer science; Power Balance; Control theory (sociology); Flow (mathematics); Power-flow study; Mathematics","score_opus":0.012772382035564297,"score_gpt":0.2434492677871696,"score_spread":0.2306768857516053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900475457","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0088508045,0.000097788696,0.9824016,0.000019533054,0.005288536,0.0008668994,0.00033016145,0.0010190558,0.0011255966],"genre_scores_gemma":[0.9791829,0.000012786649,0.020237006,0.000021073196,0.000110774636,0.00013870903,0.000027217638,0.00012909317,0.00014043362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979981,0.00007937582,0.00058892975,0.00043479062,0.00037842977,0.0005203536],"domain_scores_gemma":[0.99874604,0.000054587177,0.0000950777,0.00055509596,0.000355941,0.00019324796],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024246164,0.00042581552,0.00036920168,0.00033830697,0.00027438297,0.00013035472,0.00025862796,0.00037927413,0.0003336238],"category_scores_gemma":[0.000010517897,0.0004557389,0.00016922598,0.0006416633,0.00011812768,0.00054416666,0.0000025617921,0.00042071624,0.00024519966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050889153,0.00008993917,0.0000016863974,0.00004437881,0.00008585074,0.000011151335,0.00020658145,0.9907324,0.008380899,0.000013380117,0.00032135838,0.00006152379],"study_design_scores_gemma":[0.000402044,0.00035368206,0.0000023076677,0.00019128634,0.000058044276,0.00006203645,0.000110603905,0.93887913,0.05827807,0.0000010223797,0.0011921785,0.00046959615],"about_ca_topic_score_codex":0.000039316994,"about_ca_topic_score_gemma":0.0000052963014,"teacher_disagreement_score":0.9703321,"about_ca_system_score_codex":0.00041796203,"about_ca_system_score_gemma":0.000060660797,"threshold_uncertainty_score":0.9997894},"labels":[],"label_agreement":null},{"id":"W2901068648","doi":"10.1109/tpwrs.2018.2882560","title":"A Data-Driven Load Fluctuation Model for Multi-Region Power Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electric power system; Probabilistic logic; A priori and a posteriori; Computer science; Load management; Gaussian; Random variable; Power demand; Power (physics); Mathematics; Statistics; Engineering; Artificial intelligence","score_opus":0.0676911872754359,"score_gpt":0.2715237721997845,"score_spread":0.20383258492434864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901068648","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0054416703,0.00034516,0.9814494,0.000013408556,0.009462103,0.00074489514,0.0005252754,0.00069925375,0.0013187855],"genre_scores_gemma":[0.99602675,0.000020436017,0.0015213627,0.000022837292,0.00008232536,0.00022777659,0.000042806943,0.000121766214,0.0019339162],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980675,0.000047491114,0.0005651266,0.000496575,0.00034832288,0.000475011],"domain_scores_gemma":[0.99849856,0.0000821997,0.000096960444,0.000921204,0.00024834546,0.00015272338],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029069165,0.0003553295,0.00036352017,0.0002024341,0.00027613403,0.0001537037,0.00041972267,0.00024766263,0.000013832504],"category_scores_gemma":[0.000009355202,0.00034955208,0.00012090871,0.00023561636,0.000059087088,0.0004998434,0.0000028960364,0.00021719196,0.000120274446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004112352,0.00006967322,0.000002674818,0.00014601093,0.00015412612,0.0000028151146,0.0013570886,0.9928108,0.0014194648,0.0002047747,0.0036092072,0.00018225111],"study_design_scores_gemma":[0.0007831371,0.00013447172,0.0000027758454,0.00028782384,0.000059319205,0.000042340045,0.00019307742,0.9862404,0.00058234634,0.0000038244184,0.011284519,0.000385984],"about_ca_topic_score_codex":0.000106003376,"about_ca_topic_score_gemma":0.00018063954,"teacher_disagreement_score":0.9905851,"about_ca_system_score_codex":0.00025047924,"about_ca_system_score_gemma":0.000071714436,"threshold_uncertainty_score":0.99989563},"labels":[],"label_agreement":null},{"id":"W2901553932","doi":"10.1109/tpwrs.2018.2881250","title":"A Hybrid Framework for Short-Term Risk Assessment of Wind-Integrated Composite Power Systems","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Electric power system; Reliability (semiconductor); Wind power; Monte Carlo method; Computer science; Transmission system; Term (time); Cross entropy; Power system simulation; Entropy (arrow of time); Mathematical optimization; Engineering; Transmission (telecommunications); Principle of maximum entropy; Power (physics)","score_opus":0.011495083249243393,"score_gpt":0.2568713865858105,"score_spread":0.2453763033365671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901553932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06937539,0.00033769186,0.9092289,0.000013420338,0.015569571,0.0017528785,0.0011943677,0.0005278209,0.001999962],"genre_scores_gemma":[0.99787104,0.00003828178,0.0012835742,0.000013970299,0.000047756534,0.00033402315,0.000010519219,0.0001132745,0.00028756418],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99708956,0.00019326179,0.001095362,0.0005357788,0.00046605815,0.0006200028],"domain_scores_gemma":[0.9977203,0.00036429847,0.000192561,0.0010104001,0.00049636787,0.00021606844],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007127027,0.0004885739,0.0008724116,0.0002718141,0.00023245212,0.00014076753,0.00041302954,0.0003022813,0.000043859167],"category_scores_gemma":[0.000014752556,0.00044364203,0.00036159393,0.0003246719,0.00016010742,0.0002355138,0.000002341306,0.0005436536,0.00005249266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011442521,0.0029436562,0.0035966006,0.008437588,0.00643372,0.000084819534,0.006769967,0.88924253,0.052401915,0.012785763,0.015309902,0.00084928656],"study_design_scores_gemma":[0.004126469,0.005240663,0.0031879658,0.012283875,0.001017897,0.0004928518,0.00293674,0.82382256,0.06747543,0.0003207184,0.07518783,0.0039070016],"about_ca_topic_score_codex":0.00014925642,"about_ca_topic_score_gemma":0.000018911052,"teacher_disagreement_score":0.92849565,"about_ca_system_score_codex":0.00038010353,"about_ca_system_score_gemma":0.00008191425,"threshold_uncertainty_score":0.9998015},"labels":[],"label_agreement":null},{"id":"W2901582262","doi":"10.1109/tpwrs.2018.2881251","title":"A novel transactive energy control mechanism for collaborative networked microgrids","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":103,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"TEC; Subgradient method; Computer science; Mechanism (biology); Convergence (economics); Grid; Distributed computing; Mathematical optimization; Mathematics; Economics","score_opus":0.006668931772622693,"score_gpt":0.18991529171515759,"score_spread":0.18324635994253488,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901582262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019389375,0.0004415469,0.9918219,0.00005742895,0.0049529728,0.00087508775,0.00063820794,0.00041201236,0.00060696655],"genre_scores_gemma":[0.9969354,0.00009571629,0.0014921814,0.00015907998,0.00014520815,0.0007368334,0.000008277168,0.000088295536,0.000338989],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866295,0.000046077646,0.00039283777,0.00031858037,0.00016208882,0.00041749445],"domain_scores_gemma":[0.9989994,0.000114974086,0.0000663764,0.00025560943,0.00044166954,0.00012197335],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012860032,0.00031919335,0.0003908083,0.00016853659,0.00023293744,0.000090092464,0.00015315,0.00021618506,0.00004650311],"category_scores_gemma":[0.0000016612279,0.00031473426,0.00016612391,0.00036364642,0.00007288019,0.00017588271,2.2706965e-7,0.0001313933,0.000022830704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00075781695,0.00027698945,1.9648323e-7,0.00006907281,0.0011790263,0.0000025490622,0.0018464668,0.8934033,0.09479821,0.0021260078,0.002018432,0.0035219344],"study_design_scores_gemma":[0.0044851205,0.0006537515,9.286776e-7,0.000085240004,0.00017526966,0.000020968462,0.00048380592,0.9251831,0.051984657,0.000045637214,0.01636811,0.0005134229],"about_ca_topic_score_codex":0.0000559651,"about_ca_topic_score_gemma":0.00012289484,"teacher_disagreement_score":0.99674153,"about_ca_system_score_codex":0.00013104826,"about_ca_system_score_gemma":0.0000463746,"threshold_uncertainty_score":0.9999305},"labels":[],"label_agreement":null},{"id":"W2906125261","doi":"10.1109/tpwrs.2018.2889510","title":"Standstill Frequency Response Test and Validation of a Large Hydrogenerator","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Magnetic Properties and Applications","field":"Materials Science","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Hydro-Québec","funders":"","keywords":"Stator; Waveform; Engineering; Electromagnetic coil; Rotor (electric); Transient (computer programming); Control theory (sociology); Salient; Voltage; Computer science; Electrical engineering","score_opus":0.01271141783036952,"score_gpt":0.24248206628798277,"score_spread":0.22977064845761325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906125261","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79977334,0.00011249157,0.19837233,0.000110021356,0.0004941886,0.00027487997,0.00033843832,0.000052233558,0.00047204635],"genre_scores_gemma":[0.9989229,0.000008097908,0.00028872173,0.00003562265,0.000017794717,0.000086946784,8.5685747e-7,0.000013048775,0.0006260479],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990296,0.000100852776,0.00029097078,0.00022867472,0.00018375475,0.0001661645],"domain_scores_gemma":[0.9992664,0.00010514834,0.00009107068,0.00032375747,0.00014026227,0.00007339271],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004720647,0.00010354397,0.00014615989,0.00007224471,0.00019245708,0.00005034154,0.000108852226,0.0000599424,0.00048738086],"category_scores_gemma":[0.000018167368,0.00008588967,0.000029474073,0.00014884808,0.00011435072,0.000094971554,0.0000013443218,0.00004690132,0.00011239324],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000081711165,0.00012972113,0.000021493597,0.000021993157,0.0000048431666,5.340609e-7,0.00048418567,0.000037883347,0.99874055,0.0002422403,0.0002000833,0.000034743352],"study_design_scores_gemma":[0.00036480828,0.0006441255,0.00007012141,0.000052253847,0.000019754434,0.000014907669,0.00020352296,0.00080424716,0.99288946,0.000024080575,0.004785689,0.00012703527],"about_ca_topic_score_codex":0.000101822094,"about_ca_topic_score_gemma":0.000015933374,"teacher_disagreement_score":0.1991495,"about_ca_system_score_codex":0.00002704916,"about_ca_system_score_gemma":0.000049902214,"threshold_uncertainty_score":0.5336479},"labels":[],"label_agreement":null},{"id":"W2906506210","doi":"10.1109/tpwrs.2018.2889773","title":"Material Flow Based Power Demand Modeling of an Oil Refinery Process for Optimal Energy Management","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Cogeneration; Refinery; Electricity generation; Electricity; Oil refinery; Energy management; Distributed generation; Demand response; Energy consumption; Process engineering; Engineering; Renewable energy; Waste management; Power (physics); Energy (signal processing)","score_opus":0.011643027165909668,"score_gpt":0.21897857115378505,"score_spread":0.20733554398787538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2906506210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050312385,0.00002590651,0.94015557,0.000010266995,0.006013032,0.00018266277,0.000091993,0.00033572275,0.0028724896],"genre_scores_gemma":[0.99604607,0.000008618415,0.0028419744,0.000027953827,0.00009601719,0.00044078485,0.000016415543,0.00009974837,0.0004224351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984831,0.00003505882,0.00047982697,0.00034460885,0.00030062065,0.00035678077],"domain_scores_gemma":[0.99921817,0.000017461261,0.00005188584,0.0004922713,0.000121849036,0.000098351375],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021909583,0.00027963222,0.00030216086,0.00030709943,0.00011119278,0.000059480844,0.00023773538,0.00011655214,0.00007897031],"category_scores_gemma":[7.6423686e-7,0.00028562627,0.00010770426,0.00019887285,0.000034139768,0.0002096235,0.0000015454223,0.00006288888,0.000008823136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018287798,0.000110935376,2.1563244e-7,0.0003806637,0.00018819452,0.0000038609305,0.00012491542,0.99749047,0.00087171595,0.00010623718,0.00021712665,0.00032277024],"study_design_scores_gemma":[0.00078387064,0.00027538286,0.0000011526241,0.00015767495,0.000076507866,0.000003594745,0.00014942215,0.97179574,0.02337055,0.0000044054077,0.0030883534,0.00029335803],"about_ca_topic_score_codex":0.000044464854,"about_ca_topic_score_gemma":0.000028072067,"teacher_disagreement_score":0.94573367,"about_ca_system_score_codex":0.00009320771,"about_ca_system_score_gemma":0.00001453678,"threshold_uncertainty_score":0.9999596},"labels":[],"label_agreement":null},{"id":"W2908670949","doi":"10.1109/tpwrs.2019.2891962","title":"Performance Analysis of a 10 MW Wind Farm in Providing Secondary Frequency Regulation: Experimental Aspects","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Energy Research and Development","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wind Energy Institute of Canada","funders":"Natural Resources Canada","keywords":"Wind power; Profitability index; Automatic Generation Control; Automatic frequency control; Frequency regulation; Electric power system; Production (economics); Renewable energy; Environmental economics; Engineering; Turbine; Reliability engineering; Power (physics); Telecommunications; Business; Economics; Electrical engineering; Finance; Microeconomics","score_opus":0.009043085637631629,"score_gpt":0.21457131055305498,"score_spread":0.20552822491542336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2908670949","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9652969,0.0002356135,0.008220135,0.0000054955585,0.0007275441,0.00026832777,0.00001548288,0.00007791631,0.02515255],"genre_scores_gemma":[0.99877566,0.0000088306715,0.000060164988,0.000003040656,0.000006291954,0.000042554362,0.000006082535,0.00001963234,0.0010777117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892205,0.00002849321,0.00033799617,0.00018930036,0.0002864629,0.00023572407],"domain_scores_gemma":[0.99959236,0.000026758336,0.00003301075,0.0002445353,0.000035160065,0.00006817802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014365102,0.0001392497,0.00027948333,0.0006424153,0.000038388844,0.000025816089,0.000106126245,0.00007724432,0.00076331274],"category_scores_gemma":[6.4317675e-7,0.00013906226,0.00008936166,0.00080985506,0.0000159991,0.00018144729,8.81928e-7,0.0001560445,0.00006571947],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003908414,0.00009676419,0.001125393,0.00015509869,0.0005265895,0.000005183407,0.001351405,0.94911295,0.047138315,0.00005591934,0.000035699064,0.00035759757],"study_design_scores_gemma":[0.0021747658,0.00059876696,0.03146906,0.00050161773,0.00012129751,0.00002200243,0.0021388729,0.50395554,0.45661247,0.0000055600967,0.001514401,0.0008856679],"about_ca_topic_score_codex":0.00009614085,"about_ca_topic_score_gemma":0.000058770176,"teacher_disagreement_score":0.4451574,"about_ca_system_score_codex":0.00024002597,"about_ca_system_score_gemma":0.000060927632,"threshold_uncertainty_score":0.83577394},"labels":[],"label_agreement":null},{"id":"W2909806808","doi":"10.1109/tpwrs.2019.2891269","title":"SSCI Damping Controller Design for Series-Compensated DFIG-Based Wind Parks Considering Implementation Challenges","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Wind Turbine Control Systems","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Control theory (sociology); Controller (irrigation); Wind power; Engineering; Transient (computer programming); Turbine; Electric power system; Linear-quadratic regulator; Control engineering; Computer science; Control (management); Power (physics); Electrical engineering","score_opus":0.02895338590744148,"score_gpt":0.24164661301613644,"score_spread":0.21269322710869495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909806808","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02471498,0.00093344157,0.96165514,0.00016449546,0.0063787955,0.00453174,0.0001293939,0.0007992712,0.0006927318],"genre_scores_gemma":[0.99862623,0.000017469898,0.00030116804,0.00003954042,0.000058485148,0.00062698487,0.000010573823,0.00013595568,0.00018358185],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977435,0.00017380778,0.0007401864,0.00045113525,0.00031522693,0.0005761835],"domain_scores_gemma":[0.9986674,0.00047107495,0.00013381543,0.00044416508,0.00014909434,0.00013443612],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005777382,0.00042738332,0.0006726141,0.0002969626,0.00015901506,0.0001444102,0.0001814481,0.00020572873,0.0000986134],"category_scores_gemma":[0.000005293096,0.00043657704,0.00021282474,0.00017036876,0.000023082835,0.00035462246,7.500166e-7,0.00023392058,0.00013449414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021182297,0.000040251176,0.000019688781,0.00039341403,0.0004175442,0.0000043441446,0.0005632382,0.97093207,0.026580023,0.000108190616,0.0003514794,0.0003779104],"study_design_scores_gemma":[0.016633872,0.0011581982,0.00024709193,0.0008264843,0.0002463481,0.000086906235,0.0032476056,0.90263,0.051938374,0.00003095829,0.021342214,0.0016119473],"about_ca_topic_score_codex":0.00005610972,"about_ca_topic_score_gemma":0.000044473934,"teacher_disagreement_score":0.9739113,"about_ca_system_score_codex":0.00025051017,"about_ca_system_score_gemma":0.00006626408,"threshold_uncertainty_score":0.9998086},"labels":[],"label_agreement":null},{"id":"W2911347525","doi":"10.1109/tpwrs.2019.2897727","title":"A Review of Power System Flexibility With High Penetration of Renewables","year":2019,"lang":"en","type":"review","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":470,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Internet Registration Authority","keywords":"Flexibility (engineering); Electric power system; Renewable energy; Risk analysis (engineering); Computer science; Volatility (finance); Reliability engineering; Environmental economics; Power (physics); Computer security; Business; Engineering; Economics; Electrical engineering; Finance","score_opus":0.02779842270905443,"score_gpt":0.2538902912757321,"score_spread":0.22609186856667768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911347525","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000039765305,0.82890934,0.16188267,0.0000016435573,0.0037450476,0.0018954491,0.00020749435,0.0002240111,0.0031303556],"genre_scores_gemma":[0.022095406,0.97682285,0.000090548725,0.000005038692,0.000017900524,0.00042052666,0.00003194482,0.00013826585,0.00037753064],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.99684775,0.00024695953,0.001603355,0.00047929038,0.0005446352,0.00027803192],"domain_scores_gemma":[0.9975925,0.00013909025,0.000528139,0.0014810177,0.00018060528,0.000078636745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00057095196,0.0006019815,0.002680283,0.0004012498,0.00003333877,0.000022438107,0.0003782997,0.0002906263,0.00006700131],"category_scores_gemma":[0.000003160391,0.00047477637,0.00051484787,0.00070701865,0.000045422228,0.00012812902,0.0000020475063,0.0002430648,0.000047329184],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011322501,0.000088746434,1.7256629e-7,0.81690043,0.0011462785,0.000003859436,0.000031401578,0.17566346,0.0000034154305,0.00021401161,0.0015470989,0.0043897782],"study_design_scores_gemma":[0.00023030753,0.00025943274,6.1072046e-7,0.40877876,0.0017260717,0.00004186111,0.000056880275,0.0004679202,0.00007776184,2.4374216e-7,0.5878309,0.00052924553],"about_ca_topic_score_codex":0.00019271468,"about_ca_topic_score_gemma":0.000033860062,"teacher_disagreement_score":0.5862838,"about_ca_system_score_codex":0.00046049594,"about_ca_system_score_gemma":0.00013179671,"threshold_uncertainty_score":0.9997704},"labels":[],"label_agreement":null},{"id":"W2912035026","doi":"10.1109/tpwrs.2019.2896219","title":"Probabilistic Power Flow Calculation Using Non-Intrusive Low-Rank Approximation Method","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Probabilistic logic; Mathematical optimization; Monte Carlo method; Algorithm; Randomness; Mathematics; Exponential function; Polynomial; Random variable; Computer science; Applied mathematics; Statistics","score_opus":0.0098533408208317,"score_gpt":0.23570211691588133,"score_spread":0.22584877609504964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2912035026","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02535677,0.00004731038,0.9616253,0.000012503034,0.006627449,0.0017947945,0.00008506299,0.00039712014,0.004053723],"genre_scores_gemma":[0.99474907,0.0000024908195,0.0046261046,0.000019566574,0.000011170619,0.000118194504,0.0000128114325,0.00008250547,0.00037808283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99775577,0.00020758407,0.0007329938,0.00047122795,0.0004475736,0.0003848404],"domain_scores_gemma":[0.9987102,0.00013294499,0.0001166338,0.0006715118,0.00021896607,0.00014975267],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005323913,0.00036568491,0.00049399276,0.00028425996,0.0001402182,0.00013241256,0.00016876108,0.00026756994,0.00035118873],"category_scores_gemma":[0.000010217772,0.00036541326,0.00019414852,0.0005109466,0.000026771502,0.0004121912,0.0000014218589,0.0002885486,0.0003711514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028749384,0.000077198594,0.000018395258,0.00035441812,0.00008345122,0.0000015512661,0.0011680351,0.99448574,0.0035731103,0.0000688848,0.00006959472,0.000070892995],"study_design_scores_gemma":[0.0006332999,0.0000643924,0.00007388328,0.00020109962,0.000042044623,0.000028220566,0.00024415177,0.99529135,0.0025873266,0.0000087267435,0.00042956608,0.00039596227],"about_ca_topic_score_codex":0.00005492445,"about_ca_topic_score_gemma":0.000010344594,"teacher_disagreement_score":0.9693923,"about_ca_system_score_codex":0.0005150206,"about_ca_system_score_gemma":0.000059640264,"threshold_uncertainty_score":0.9998798},"labels":[],"label_agreement":null},{"id":"W2912753047","doi":"10.1109/tpwrs.2019.2894769","title":"Power System Dynamic State Estimation: Motivations, Definitions, Methodologies, and Future Work","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":703,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"Division of Electrical, Communications and Cyber Systems; Engineering and Physical Sciences Research Council; Office of Electricity Delivery and Energy Reliability","keywords":"Electric power system; Estimation; Reliability (semiconductor); State (computer science); Task (project management); Computer science; Reliability engineering; Resilience (materials science); Work (physics); Industrial engineering; Control engineering; Power (physics); Engineering; Systems engineering; Algorithm","score_opus":0.016944117091689873,"score_gpt":0.2280524109415734,"score_spread":0.21110829384988355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2912753047","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010695814,0.00093042664,0.9721474,0.000109554574,0.007433005,0.0009622645,0.00021596094,0.0012319153,0.006273641],"genre_scores_gemma":[0.99488723,0.00012543998,0.004155272,0.00003070592,0.0000047663607,0.0001690384,0.000017090633,0.00006808673,0.00054235477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978886,0.0002927727,0.0006751338,0.00042574448,0.00033243242,0.00038526425],"domain_scores_gemma":[0.9986078,0.0002916331,0.000103610015,0.0006625469,0.0001264764,0.00020792712],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000598527,0.00036141308,0.00048251828,0.00029849788,0.00019573398,0.00017132668,0.00017086338,0.0002249654,0.00017094884],"category_scores_gemma":[0.000011205435,0.00034901395,0.000115805,0.00060410996,0.000043118096,0.0003441071,0.0000020403406,0.00033599188,0.0002919721],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005756325,0.00007045634,0.00019604343,0.000757376,0.00025051128,0.000006769682,0.0014064913,0.9939161,0.000121997386,0.0017923428,0.00093719445,0.0004871637],"study_design_scores_gemma":[0.004138447,0.0005391693,0.0059767636,0.0019031737,0.0002316059,0.00054008607,0.014899684,0.9253501,0.0009114173,0.00015719648,0.042002507,0.0033498222],"about_ca_topic_score_codex":0.000011467435,"about_ca_topic_score_gemma":0.00000519811,"teacher_disagreement_score":0.9841914,"about_ca_system_score_codex":0.00037266852,"about_ca_system_score_gemma":0.000053489934,"threshold_uncertainty_score":0.99989617},"labels":[],"label_agreement":null},{"id":"W2913033704","doi":"10.1109/tpwrs.2019.2898425","title":"Predictive Control of Flexible Resources for Demand Response in Active Distribution Networks","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Energinet.dk","keywords":"Model predictive control; Flexibility (engineering); Controller (irrigation); Computer science; Demand response; Control theory (sociology); Control engineering; MATLAB; Engineering; Mathematical optimization; Control (management); Electricity; Electrical engineering","score_opus":0.004640838511441211,"score_gpt":0.2042729547349533,"score_spread":0.1996321162235121,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2913033704","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25191346,0.00017227458,0.74325705,0.000010998647,0.0016526709,0.0010873826,0.0016236693,0.00013268547,0.00014982371],"genre_scores_gemma":[0.99946296,0.0000073130645,0.000013741391,0.000004034358,0.000013248883,0.00030114863,0.000029090801,0.000034024568,0.00013441658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987149,0.00012737552,0.00041616958,0.00024179246,0.000183896,0.0003158213],"domain_scores_gemma":[0.9990781,0.0003957821,0.00007860402,0.0002713198,0.00010804976,0.00006817831],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043420462,0.00019793636,0.00034855172,0.00014474065,0.00004639033,0.000025068766,0.00011487006,0.00020537975,0.000023777851],"category_scores_gemma":[0.000009781864,0.00020822538,0.00012646335,0.00029956698,0.00003664382,0.00020546175,5.824234e-7,0.00022472671,0.000019153562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004638869,0.000089749694,0.00007253826,0.00006515096,0.00012243834,0.0000010299631,0.0003760282,0.9921735,0.0021776953,0.00004932213,0.00017370452,0.000059964663],"study_design_scores_gemma":[0.0032089031,0.0014292328,0.005340036,0.00031563305,0.00007038496,0.0000073681517,0.0008288746,0.97788733,0.008973107,0.0000072691173,0.0016096781,0.00032220437],"about_ca_topic_score_codex":0.000023573924,"about_ca_topic_score_gemma":0.0000037386699,"teacher_disagreement_score":0.74754953,"about_ca_system_score_codex":0.00034855836,"about_ca_system_score_gemma":0.00002221944,"threshold_uncertainty_score":0.8491184},"labels":[],"label_agreement":null},{"id":"W2915048479","doi":"10.1109/tpwrs.2019.2895573","title":"Microgrid Dispatch With Frequency-Aware Islanding Constraints","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Islanding; Microgrid; Economic dispatch; Automatic frequency control; Control theory (sociology); Frequency regulation; Scheme (mathematics); Computer science; Power system simulation; Power (physics); Electric power system; Distributed generation; Control engineering; Engineering; Reliability engineering; Mathematical optimization; Control (management); Telecommunications; Electrical engineering; Mathematics; Renewable energy","score_opus":0.0031932313784934947,"score_gpt":0.16356027839801393,"score_spread":0.16036704701952043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915048479","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026116708,0.0005525347,0.9664264,0.000021444916,0.0030082248,0.00056128064,0.00012046508,0.0004458434,0.0027471082],"genre_scores_gemma":[0.9992872,0.000092155125,0.00021532462,0.000021105427,0.0000179895,0.000054696353,0.0000078905705,0.00005234891,0.00025131096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906284,0.000025384212,0.00023736533,0.00022488099,0.00016535992,0.00028415688],"domain_scores_gemma":[0.9995227,0.00003433213,0.000036102487,0.00027639655,0.000050790266,0.000079694844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000072005954,0.00021653197,0.00024268297,0.00012598337,0.0000725113,0.000086617656,0.000112851296,0.00010726756,0.00034972304],"category_scores_gemma":[3.1639064e-7,0.00018480982,0.0000709413,0.00018409373,0.000033542125,0.0001652792,3.111097e-7,0.00020980761,0.00034780023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040225765,0.000064630854,0.0005857944,0.00019039348,0.0002803167,0.00001817844,0.00055715925,0.9856354,0.010224135,0.0000355731,0.0003973736,0.0019708392],"study_design_scores_gemma":[0.011664501,0.0015217244,0.00075143244,0.002787011,0.00045410066,0.0010086184,0.0038392814,0.91667765,0.037923943,0.000022786991,0.019270092,0.0040788413],"about_ca_topic_score_codex":0.00004493499,"about_ca_topic_score_gemma":0.00003277861,"teacher_disagreement_score":0.97317046,"about_ca_system_score_codex":0.0000907741,"about_ca_system_score_gemma":0.000022083435,"threshold_uncertainty_score":0.7536326},"labels":[],"label_agreement":null},{"id":"W2915629347","doi":"10.1109/tpwrs.2018.2872822","title":"Very Short-Term Wind Power Prediction Interval Framework via Bi-Level Optimization and Novel Convex Cost Function","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Benchmark (surveying); Prediction interval; Term (time); Electric power system; Interval (graph theory); Computer science; Minification; Wind power; Convex optimization; Differentiable function; Hyperparameter; Function (biology); Operator (biology); Power (physics); Engineering; Mathematics; Regular polygon; Artificial intelligence; Machine learning","score_opus":0.01623981703473089,"score_gpt":0.20754074978593282,"score_spread":0.1913009327512019,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915629347","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07993054,0.0001537412,0.9035509,0.000009624719,0.0138375005,0.00046324608,0.00014934712,0.00042936794,0.0014757251],"genre_scores_gemma":[0.99876654,0.00003801961,0.00051970524,0.00003500112,0.000066335284,0.00004615419,0.000027781582,0.00009085612,0.000409587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985138,0.000036458136,0.00046268568,0.00037423457,0.00028260532,0.00033020953],"domain_scores_gemma":[0.9992821,0.000101033096,0.000058234633,0.00033952636,0.000078487654,0.00014058531],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017557283,0.00032628185,0.00032041667,0.00026134978,0.00014903978,0.00013554926,0.00010688262,0.0003564803,0.00025877668],"category_scores_gemma":[0.0000029228572,0.00033939857,0.00010581779,0.00026841095,0.00003801495,0.00048549077,0.0000020684354,0.00046690402,0.000068143374],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000695545,0.000074922995,0.00059357303,0.000111213965,0.00018679451,0.0000019953145,0.00045329818,0.99206513,0.005591446,0.00008256797,0.00007779793,0.00069167593],"study_design_scores_gemma":[0.0012429575,0.0006158069,0.0023923062,0.0012268753,0.00014681688,0.00016170651,0.00040123044,0.9868848,0.0033258519,0.000010307253,0.0027846915,0.00080665253],"about_ca_topic_score_codex":0.000026426906,"about_ca_topic_score_gemma":0.000007981329,"teacher_disagreement_score":0.918836,"about_ca_system_score_codex":0.00014431968,"about_ca_system_score_gemma":0.00001716663,"threshold_uncertainty_score":0.9999058},"labels":[],"label_agreement":null},{"id":"W2917258713","doi":"10.1109/tpwrs.2019.2901705","title":"Compressed Air Energy Storage System Modeling for Power System Studies","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"Compressed air energy storage; Electric power system; Energy storage; Wind power; Compressed air; Engineering; Renewable energy; Gas compressor; Permanent magnet synchronous generator; Power (physics); Control theory (sociology); Automotive engineering; Control engineering; Computer science; Electrical engineering; Mechanical engineering; Voltage","score_opus":0.010721917278158846,"score_gpt":0.2006212195036926,"score_spread":0.18989930222553375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2917258713","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004551544,0.004666351,0.97695786,0.000010759048,0.0106107965,0.0008862,0.00013147455,0.0011931655,0.0009918739],"genre_scores_gemma":[0.99868274,0.00005545537,0.00017414124,0.000015995294,0.000045540794,0.00042781315,0.0000068875916,0.00010377074,0.00048765767],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99840504,0.00006349104,0.0005589088,0.0003504973,0.0002445249,0.00037756268],"domain_scores_gemma":[0.9990498,0.00010031555,0.00007576646,0.00046091486,0.00021963593,0.00009355606],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001742567,0.0003391666,0.00059491454,0.00022416378,0.00016381725,0.00006854395,0.00018607166,0.0001731365,0.000007668999],"category_scores_gemma":[0.0000010191708,0.0003191673,0.0002114986,0.00017877975,0.000012824856,0.00020147266,0.0000011564713,0.00013956372,0.00007236728],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052309017,0.00002470414,5.0901355e-7,0.0011124077,0.00039544306,0.0000029286198,0.000403884,0.99577475,0.0013761657,0.00049395347,0.00031369657,0.00004926433],"study_design_scores_gemma":[0.0010447365,0.0000976257,3.3207317e-7,0.0006570767,0.00007675069,0.000023098844,0.0036612118,0.9909971,0.0008968043,6.4947346e-7,0.0022107724,0.00033387527],"about_ca_topic_score_codex":0.00004820925,"about_ca_topic_score_gemma":0.000008966605,"teacher_disagreement_score":0.9941312,"about_ca_system_score_codex":0.00042198502,"about_ca_system_score_gemma":0.000019719479,"threshold_uncertainty_score":0.99992603},"labels":[],"label_agreement":null},{"id":"W2920482741","doi":"10.1109/tpwrs.2019.2902740","title":"Functional Mock-Up Interface Based Parallel Multistep Approach With Signal Correction for Electromagnetic Transients Simulations","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Extrapolation; Asynchronous communication; Interface (matter); Computer science; Flexibility (engineering); SIGNAL (programming language); Electronic engineering; Engineering; Parallel computing; Mathematics","score_opus":0.010408188384376049,"score_gpt":0.2037308315233694,"score_spread":0.19332264313899336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920482741","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037322644,0.00007275991,0.95292413,0.000008896063,0.0060144207,0.00235218,0.00009449297,0.00046555622,0.00074492954],"genre_scores_gemma":[0.9941018,0.0000013468117,0.0007321305,0.0000088983525,0.0000370741,0.00076285744,0.000029731425,0.00009232571,0.0042338115],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983876,0.000069307236,0.00042379182,0.00041679715,0.0003365934,0.0003659247],"domain_scores_gemma":[0.9992567,0.000121732905,0.00007088216,0.00030136463,0.00014265356,0.00010671836],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013972622,0.000324568,0.00032413704,0.00026120443,0.00019799183,0.00009190291,0.00009874148,0.0002061867,0.00013400624],"category_scores_gemma":[0.0000013357024,0.00030214927,0.00014878248,0.00033252966,0.000023512015,0.00022913583,2.7818152e-7,0.00031213037,0.00008703283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032947972,0.00013160343,0.000014153828,0.00019703606,0.00012218786,3.0891266e-7,0.00021576081,0.9837605,0.014585982,0.000009408539,0.00036288277,0.00027072564],"study_design_scores_gemma":[0.0025717334,0.0009219885,0.00011910102,0.00013753516,0.000062058534,0.00004071227,0.00023283684,0.9881567,0.005386207,0.0000016855607,0.0019915304,0.00037795768],"about_ca_topic_score_codex":0.00008243705,"about_ca_topic_score_gemma":0.000043108917,"teacher_disagreement_score":0.9567792,"about_ca_system_score_codex":0.0002336106,"about_ca_system_score_gemma":0.000042733147,"threshold_uncertainty_score":0.9999431},"labels":[],"label_agreement":null},{"id":"W2921760002","doi":"10.1109/tpwrs.2019.2905782","title":"Recovery Risk Mitigation of Wind Integrated Bulk Power System With Flywheel Energy Storage","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reliability engineering; Electric power system; Wind power; Energy storage; Renewable energy; Flywheel; Engineering; Automotive engineering; Computer science; Environmental science; Power (physics); Electrical engineering","score_opus":0.0029453780592711707,"score_gpt":0.15928985400553827,"score_spread":0.1563444759462671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921760002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20796935,0.0002913752,0.7770655,0.000006622681,0.0063545005,0.0005672093,0.0002692426,0.00045285106,0.0070233406],"genre_scores_gemma":[0.99814266,0.00003348259,0.00009043108,0.00000899755,0.000012578603,0.00007105469,0.000008023173,0.00008629675,0.0015465007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978513,0.00018642044,0.0007138095,0.00042465923,0.00043553722,0.00038824498],"domain_scores_gemma":[0.998468,0.0001417266,0.00021778066,0.00080713176,0.00022710337,0.00013830462],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040511304,0.00038370176,0.0006283676,0.00029323893,0.00008039442,0.0000706575,0.00023978254,0.00026845236,0.00006970925],"category_scores_gemma":[0.0000045713973,0.00032207,0.0001898556,0.000494453,0.000058924914,0.00040723354,0.0000011465227,0.00035622923,0.00015328596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020651716,0.00014986162,0.00011587714,0.0011008894,0.00055722357,0.000015824584,0.0008738321,0.9896489,0.00568365,0.0007451096,0.000690536,0.0002117876],"study_design_scores_gemma":[0.014031861,0.007987297,0.002430499,0.026483912,0.0010669521,0.0012814853,0.030167608,0.6439864,0.14694177,0.00005568095,0.11827668,0.0072898865],"about_ca_topic_score_codex":0.0007020069,"about_ca_topic_score_gemma":0.00008596543,"teacher_disagreement_score":0.7901733,"about_ca_system_score_codex":0.0004484074,"about_ca_system_score_gemma":0.00007618976,"threshold_uncertainty_score":0.9999231},"labels":[],"label_agreement":null},{"id":"W2944258215","doi":"10.1109/tpwrs.2019.2916227","title":"Energy Management of AC–DC Hybrid Distribution Systems Considering Network Reconfiguration","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":91,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Control reconfiguration; Schedule; Mathematical optimization; Integer programming; Energy management; Energy management system; Linear programming; Computer science; Distributed generation; Power (physics); Energy (signal processing); Engineering; Algorithm; Electrical engineering; Mathematics; Renewable energy; Embedded system","score_opus":0.0049679207769525386,"score_gpt":0.16846800905440895,"score_spread":0.1635000882774564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2944258215","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0069998493,0.0012832647,0.98188776,0.000008359615,0.0068950225,0.00048018986,0.00009783291,0.00025023567,0.0020974951],"genre_scores_gemma":[0.99875075,0.00042609076,0.00006401393,0.000005942749,0.00003217756,0.000099235396,0.000047627866,0.000035032732,0.0005391146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988083,0.00005303924,0.0004904006,0.00020928253,0.0001895455,0.00024939002],"domain_scores_gemma":[0.9994249,0.00003727689,0.00009768696,0.00031158084,0.00007227711,0.000056305238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001516854,0.00019150507,0.00029206605,0.000074432144,0.000064903616,0.00006909146,0.000093084745,0.000084807245,0.00004721177],"category_scores_gemma":[2.9480785e-7,0.00020091704,0.00009285111,0.00018407941,0.000012772971,0.00017688074,7.142667e-7,0.00010204841,0.00005694376],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022268048,0.000021940137,0.000008004272,0.00025105246,0.00019709238,0.000003341589,0.00002929846,0.99624836,0.00086370256,0.0005533066,0.0007204733,0.0010811819],"study_design_scores_gemma":[0.0008811786,0.00010135391,0.0000409814,0.00068931736,0.00009542099,0.00004113601,0.00020874105,0.96958786,0.006520426,0.000008738185,0.021452809,0.0003720589],"about_ca_topic_score_codex":0.0000576448,"about_ca_topic_score_gemma":0.0000035016478,"teacher_disagreement_score":0.9917509,"about_ca_system_score_codex":0.00012915148,"about_ca_system_score_gemma":0.000009541279,"threshold_uncertainty_score":0.8193159},"labels":[],"label_agreement":null},{"id":"W2945010593","doi":"10.1109/tpwrs.2019.2918229","title":"A Two-Layer Network Equivalent With Local Passivity Compensation With Applications to Hybrid Simulations of MMC-Based AC–DC Grids","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Key Research and Development Program of China; National Natural Science Foundation of China","keywords":"Passivity; Compensation (psychology); Control theory (sociology); Computer science; Layer (electronics); AC power; Electronic engineering; Engineering; Electrical engineering; Voltage; Materials science; Control (management)","score_opus":0.011509190727775844,"score_gpt":0.22854103915249957,"score_spread":0.21703184842472373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945010593","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09681459,0.000030328636,0.89900815,0.000029861154,0.0007329716,0.0023647407,0.00012663368,0.00028602712,0.0006067009],"genre_scores_gemma":[0.99822545,0.0000010305619,0.0007761755,0.000024098068,0.000046279667,0.0007098964,0.000015179811,0.00006998492,0.00013190215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998391,0.00008021738,0.0004577157,0.0003377891,0.00041369587,0.00031961125],"domain_scores_gemma":[0.9988465,0.00010833706,0.00011234387,0.000595325,0.00019287212,0.00014465759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019168446,0.00027541173,0.00038355263,0.00020319334,0.00014647607,0.000053722593,0.00013135828,0.00008585716,0.000054262808],"category_scores_gemma":[6.6907e-7,0.00023283828,0.000080808764,0.00062019663,0.0000390651,0.00017517908,9.701673e-7,0.00023472456,0.00013917832],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010824329,0.00008749721,0.00019246597,0.00017133914,0.00011389172,0.0000012427324,0.00009630382,0.99490476,0.0037827922,0.00010694508,0.000063110325,0.0003714019],"study_design_scores_gemma":[0.0026107833,0.0011315777,0.0007913196,0.0008723846,0.00014076004,0.000048927708,0.00032919124,0.96814734,0.017464617,0.0000065698664,0.0077077546,0.00074878236],"about_ca_topic_score_codex":0.00026990968,"about_ca_topic_score_gemma":0.00024584497,"teacher_disagreement_score":0.9014109,"about_ca_system_score_codex":0.00022169329,"about_ca_system_score_gemma":0.00005916824,"threshold_uncertainty_score":0.949487},"labels":[],"label_agreement":null},{"id":"W2948555760","doi":"10.1109/tpwrs.2019.2920782","title":"A Self-Adjusting Adaptive AVR-LFC Scheme for Synchronous Generators","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa; Université de Moncton","funders":"","keywords":"Robustness (evolution); Control theory (sociology); Automatic Generation Control; Electric power system; Nonlinear system; Computer science; Voltage regulator; Heuristics; PID controller; Voltage; Control engineering; Adaptive control; Mathematical optimization; Power (physics); Engineering; Control (management); Mathematics; Temperature control","score_opus":0.00854861892057248,"score_gpt":0.19768503892422742,"score_spread":0.18913642000365494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2948555760","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022792507,0.0016454556,0.9425231,0.000014774041,0.021416668,0.0024857973,0.00016481153,0.0016441676,0.007312682],"genre_scores_gemma":[0.9951753,0.000015633019,0.0027281735,0.000029608067,0.00012480337,0.00085513724,0.0000034435313,0.00018543605,0.0008824631],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997629,0.00008116701,0.00071261113,0.0005234136,0.0003677037,0.000686112],"domain_scores_gemma":[0.9985829,0.00022605387,0.00011209282,0.0007156553,0.00017788302,0.00018544201],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035691512,0.00047687272,0.00061219785,0.00030491795,0.00016139174,0.00012777607,0.0003278492,0.00029985682,0.00006440827],"category_scores_gemma":[0.0000048564325,0.000494848,0.0002820096,0.00034221934,0.000024356379,0.0003241623,0.0000010588145,0.00037135227,0.0006594768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015380015,0.0003415587,0.000090903166,0.0023701116,0.0022933672,0.00003296144,0.0037067528,0.93890446,0.043811843,0.0019430615,0.005385554,0.0009656105],"study_design_scores_gemma":[0.0023038136,0.0006516817,0.000010257893,0.00047820367,0.00013813957,0.000096353164,0.0009191273,0.9550218,0.013515761,0.000010354721,0.025734564,0.0011199291],"about_ca_topic_score_codex":0.000077189936,"about_ca_topic_score_gemma":0.000026450569,"teacher_disagreement_score":0.9723828,"about_ca_system_score_codex":0.00060976774,"about_ca_system_score_gemma":0.00008625745,"threshold_uncertainty_score":0.9997503},"labels":[],"label_agreement":null},{"id":"W2949552163","doi":"10.1109/tpwrs.2019.2924019","title":"Capacity Scheduling of Energy Storage and Conventional Generation for Frequency Regulation Based on CPS1","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Scheduling (production processes); Mathematical optimization; Automatic Generation Control; Energy storage; Linear programming; Electric power system; Automatic frequency control; Computation; Computer science; Piecewise linear function; Integer programming; Control theory (sociology); Reliability engineering; Engineering; Power (physics); Algorithm; Mathematics; Control (management)","score_opus":0.015207034753840424,"score_gpt":0.20263989062368964,"score_spread":0.18743285586984923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2949552163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07681486,0.00022821494,0.91448265,0.000023076816,0.0063433307,0.0006383623,0.00016306735,0.00014611587,0.001160317],"genre_scores_gemma":[0.99851966,0.000004302642,0.0008664018,0.000019773157,0.000054786495,0.00020492593,0.000020624693,0.00005252289,0.00025701788],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858797,0.00008573111,0.000517907,0.00029638482,0.00030623854,0.00020579618],"domain_scores_gemma":[0.999144,0.00014700435,0.00011745534,0.0003674669,0.00015441772,0.00006965334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003144189,0.00022268116,0.00032759155,0.0002740566,0.00007877601,0.00004414981,0.00009171469,0.00018581604,0.00005885829],"category_scores_gemma":[0.000005679319,0.00023668294,0.00012946506,0.00014619844,0.00003244012,0.00020648332,2.7204607e-7,0.00012534785,0.000013423031],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028720015,0.00005127093,0.000044125125,0.0002586742,0.000081370454,4.056865e-7,0.00008030244,0.8580099,0.13707167,0.0041829334,0.00011377229,0.00007690454],"study_design_scores_gemma":[0.0011671347,0.0002547626,0.00008673464,0.00022147168,0.000030617004,0.0000057715206,0.00002571997,0.97429127,0.023091333,0.000047694957,0.0005355429,0.00024192235],"about_ca_topic_score_codex":0.000102548205,"about_ca_topic_score_gemma":0.000033388602,"teacher_disagreement_score":0.92170477,"about_ca_system_score_codex":0.0001883699,"about_ca_system_score_gemma":0.00003612296,"threshold_uncertainty_score":0.965165},"labels":[],"label_agreement":null},{"id":"W2954389172","doi":"10.1109/tpwrs.2019.2924441","title":"Cyber-Physical Attacks Targeting Communication-Assisted Protection Schemes","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":86,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; University of Toronto","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada","keywords":"Computer security; Cyber-physical system; Vulnerability (computing); Vulnerability assessment; Computer science; Smart grid; Electric power system; Denial-of-service attack; Power-system protection; Telecommunications network; Grid; Telecommunications; Engineering; Power (physics); The Internet; Electrical engineering","score_opus":0.009818688240305337,"score_gpt":0.21814471520573817,"score_spread":0.20832602696543284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954389172","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5070098,0.00028121367,0.48485556,0.00005100365,0.0033390515,0.0006763544,0.00001540697,0.0006142073,0.0031573896],"genre_scores_gemma":[0.9990675,0.000023773997,0.00008305077,0.000010147141,0.000028625202,0.00013023669,0.0000031109773,0.000034805194,0.00061875465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901646,0.00007551494,0.0002455823,0.00020041094,0.00023465777,0.00022737891],"domain_scores_gemma":[0.99930793,0.000072524475,0.00004122251,0.0004509788,0.00005756828,0.00006977467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013276475,0.00017315839,0.00020874565,0.00010721404,0.00018120673,0.000070113005,0.00019902691,0.0001223287,0.000055516164],"category_scores_gemma":[0.0000023270966,0.00016585289,0.00010778421,0.00027321352,0.00003771723,0.00022150997,0.0000011391231,0.0004293324,0.00059584534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007794953,0.00061815453,0.00016958655,0.00069831294,0.00037837622,0.0000062935346,0.0056296876,0.8610656,0.1256347,0.00057862914,0.0021886912,0.0029539876],"study_design_scores_gemma":[0.0015850808,0.00037572687,0.0008255013,0.00090182025,0.00007954936,0.00009157229,0.0027215797,0.7667255,0.10079384,0.000019011419,0.124522135,0.0013586878],"about_ca_topic_score_codex":0.00008481326,"about_ca_topic_score_gemma":0.000015492004,"teacher_disagreement_score":0.49205768,"about_ca_system_score_codex":0.00009891542,"about_ca_system_score_gemma":0.000015510044,"threshold_uncertainty_score":0.76585853},"labels":[],"label_agreement":null},{"id":"W2954646619","doi":"10.1109/tpwrs.2019.2925703","title":"Microgrid Stability Definitions, Analysis, and Examples","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":732,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Universitat Politècnica de Catalunya","keywords":"Microgrid; Intermittency; Stability (learning theory); Computer science; Wind power; Task (project management); Inertia; Power (physics); Distributed generation; Control engineering; Reliability engineering; Engineering; Voltage; Renewable energy; Electrical engineering; Systems engineering; Physics; Machine learning","score_opus":0.011453718781882853,"score_gpt":0.1799185597675074,"score_spread":0.16846484098562453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954646619","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17823197,0.0025617774,0.8164729,0.000016365637,0.0012071949,0.00037808134,0.00017733802,0.00031649444,0.00063789263],"genre_scores_gemma":[0.9988865,0.0007016557,0.0002719107,0.000015872305,0.000006745164,0.000043731427,0.000012542178,0.00002029963,0.000040721952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992071,0.000043342992,0.0002515431,0.00021229012,0.00010974438,0.00017597555],"domain_scores_gemma":[0.9995053,0.00007046503,0.00002633827,0.00028780953,0.000042162712,0.0000679228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012469076,0.0001487321,0.0002497752,0.00021624246,0.000066715,0.000080078855,0.00006317301,0.000083022795,0.00024656497],"category_scores_gemma":[8.183465e-7,0.00014586837,0.00010662499,0.00036083188,0.000020217794,0.00012116221,4.2010248e-7,0.00012506564,0.00010237593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043224343,0.00015143999,0.0023616462,0.00024318616,0.001530404,0.0000025931558,0.0007980562,0.96963483,0.02260585,0.00012961391,0.00023038153,0.0022687744],"study_design_scores_gemma":[0.003866408,0.0004448588,0.010230914,0.00021671107,0.002241733,0.000079517566,0.0021765404,0.8945369,0.048464935,0.000056537618,0.03548807,0.0021968605],"about_ca_topic_score_codex":0.00008806535,"about_ca_topic_score_gemma":0.000076104116,"teacher_disagreement_score":0.8206546,"about_ca_system_score_codex":0.000047955196,"about_ca_system_score_gemma":0.000008875427,"threshold_uncertainty_score":0.5948339},"labels":[],"label_agreement":null},{"id":"W2955540607","doi":"10.1109/tpwrs.2019.2926410","title":"Short-Circuit Constrained Power System Expansion Planning Considering Bundling and Voltage Levels of Lines","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Linearization; Electric power transmission; Electric power system; Time horizon; Voltage; Mathematical optimization; Transmission line; Control theory (sociology); Representation (politics); Integer (computer science); Engineering; Nonlinear system; Integer programming; Power (physics); Computer science; Electrical engineering; Mathematics; Control (management)","score_opus":0.018735337284884603,"score_gpt":0.21952922202782985,"score_spread":0.20079388474294524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955540607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22868985,0.00069579115,0.7627427,0.0000027321364,0.003531937,0.0007416004,0.000083141975,0.0005638431,0.0029484073],"genre_scores_gemma":[0.99943167,0.000011550993,0.00017186406,0.000005359909,0.000016104594,0.000067646615,0.0000027631515,0.00010051949,0.00019254984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99783117,0.00007715595,0.0008789873,0.00040801402,0.0003880057,0.00041665195],"domain_scores_gemma":[0.9988772,0.00025002682,0.00012753971,0.00046105654,0.00014460392,0.00013952547],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039095333,0.00038179997,0.00066691934,0.00046025173,0.00010784026,0.00009038007,0.00014888299,0.00026427335,0.000037096215],"category_scores_gemma":[0.0000066122043,0.00039999603,0.0001124486,0.00038396457,0.000046602447,0.0003056058,0.0000020007137,0.00030296316,0.00003068524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000356693,0.000050301824,0.00041331167,0.0016090184,0.0003209136,0.000028303308,0.002230921,0.87444323,0.12009027,0.00042327642,0.00005776308,0.00029699554],"study_design_scores_gemma":[0.0034500726,0.0009348263,0.0007298112,0.009635765,0.0002885764,0.0013362224,0.010915669,0.83354557,0.13603437,0.000009214547,0.00076188426,0.0023580475],"about_ca_topic_score_codex":0.000025051195,"about_ca_topic_score_gemma":0.0000018708486,"teacher_disagreement_score":0.7707418,"about_ca_system_score_codex":0.00017971551,"about_ca_system_score_gemma":0.000046907913,"threshold_uncertainty_score":0.9998452},"labels":[],"label_agreement":null},{"id":"W2955899994","doi":"10.1109/tpwrs.2019.2924495","title":"Cross-Gramian Model Reduction Approach for Tuning Power System Stabilizers in Large Power Networks","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Khalifa University of Science, Technology and Research","keywords":"Electric power system; Gramian matrix; Reduction (mathematics); Control theory (sociology); Power (physics); Blackout; Engineering; Computer science; Control engineering; Mathematics","score_opus":0.010892677272942918,"score_gpt":0.22639230782664566,"score_spread":0.21549963055370275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955899994","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03202288,0.00021883831,0.9472619,0.000007155351,0.0072941505,0.0025691406,0.00021306347,0.00085380394,0.009559028],"genre_scores_gemma":[0.9971207,0.0000067363,0.0009122177,0.000012051296,0.000011218956,0.00058396417,0.000028566372,0.00015391456,0.0011706634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967877,0.00016066685,0.0010621605,0.00074179965,0.0004124737,0.0008351556],"domain_scores_gemma":[0.99845433,0.00008152901,0.00013397797,0.00091735146,0.0001953333,0.0002174542],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0010974834,0.0005009188,0.000715857,0.00041955165,0.00020135006,0.00023490268,0.0003052615,0.0004828749,0.000078810815],"category_scores_gemma":[0.000005592767,0.0005207662,0.00030890983,0.0006101363,0.000046061457,0.00053397415,0.000002625716,0.0005255148,0.000041678148],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011009148,0.00016954156,0.00018439036,0.0004670146,0.00008031416,0.0000010940606,0.001391065,0.99669844,0.00031503674,0.00045549244,0.00011707097,0.000010453703],"study_design_scores_gemma":[0.001616247,0.000109770954,0.000059322123,0.00018899972,0.000020148227,0.000028329014,0.0034316438,0.99326456,0.00013775151,0.0000013859926,0.0006097469,0.0005320821],"about_ca_topic_score_codex":0.000034326524,"about_ca_topic_score_gemma":0.000013407535,"teacher_disagreement_score":0.9650978,"about_ca_system_score_codex":0.00088711653,"about_ca_system_score_gemma":0.00006436744,"threshold_uncertainty_score":0.9997244},"labels":[],"label_agreement":null},{"id":"W2963080021","doi":"10.1109/tpwrs.2018.2825657","title":"Applying Polynomial Chaos Expansion to Assess Probabilistic Available Delivery Capability for Distribution Networks With Renewables","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Polynomial chaos; Probabilistic logic; Randomness; Mathematical optimization; Monte Carlo method; Renewable energy; Computer science; Probability distribution; CHAOS (operating system); Random variable; Reliability engineering; Engineering; Mathematics; Electrical engineering","score_opus":0.08336794606529971,"score_gpt":0.2984859823716327,"score_spread":0.215118036306333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963080021","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016385464,0.00004664125,0.9763364,0.000057300895,0.0035596075,0.0029722073,0.0002374654,0.00019727013,0.00020763591],"genre_scores_gemma":[0.9934764,0.000001945252,0.0030373049,0.000044729873,0.00013864347,0.00177119,0.000011134662,0.00003903274,0.0014796058],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965818,0.00020971858,0.0008044409,0.00096206943,0.0008664351,0.0005755668],"domain_scores_gemma":[0.99629444,0.0013293477,0.00018243823,0.0009956112,0.000903077,0.00029509616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023368248,0.00033516524,0.00051371544,0.00020326114,0.00064428075,0.0003468775,0.0005185398,0.00021373916,0.00010357937],"category_scores_gemma":[0.000250344,0.0002424099,0.00014390395,0.0008818129,0.00017676048,0.00030058538,0.000004799339,0.00016488374,0.00014754174],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071833836,0.00022459177,0.00004981164,0.000055102857,0.000051682036,0.0000021735984,0.00020568196,0.97135705,0.0012879346,0.00013917164,0.024814783,0.0010936919],"study_design_scores_gemma":[0.0021935178,0.0036036207,0.00015893047,0.0006921168,0.00019966035,0.000073822426,0.0013010567,0.8955608,0.008073168,0.00024294537,0.086435065,0.0014652972],"about_ca_topic_score_codex":0.00018811367,"about_ca_topic_score_gemma":0.00016713986,"teacher_disagreement_score":0.97709095,"about_ca_system_score_codex":0.00034677293,"about_ca_system_score_gemma":0.00021693522,"threshold_uncertainty_score":0.9885189},"labels":[],"label_agreement":null},{"id":"W2963569609","doi":"10.1109/tpwrs.2019.2929685","title":"Optimal Energy Flow for Integrated Energy Systems Considering Gas Transients","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Discretization; Energy flow; Flow (mathematics); Transient (computer programming); Energy (signal processing); Computer science; Mathematical optimization; Applied mathematics; Mathematics; Mechanics; Physics; Mathematical analysis","score_opus":0.00676188393534822,"score_gpt":0.18591335313211768,"score_spread":0.17915146919676947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963569609","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034938469,0.0007126869,0.9729038,0.000011852481,0.017718218,0.0006608806,0.00028180087,0.0011040883,0.0031128468],"genre_scores_gemma":[0.99323046,0.00008981847,0.0010726979,0.00002919303,0.00005902503,0.000780269,0.000079928504,0.0002525504,0.0044060475],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99722034,0.00013981904,0.0009426491,0.00058071275,0.00041348086,0.00070298475],"domain_scores_gemma":[0.9985328,0.00016259999,0.00011919029,0.0006377127,0.00033875633,0.00020898951],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023023272,0.000615349,0.00073835766,0.0005542057,0.00016266681,0.0002367086,0.00028339188,0.0004839573,0.00008832482],"category_scores_gemma":[0.000003865929,0.000607971,0.00028123648,0.00053604454,0.00003809026,0.00038253202,9.322229e-7,0.00027915888,0.00008496291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000779602,0.000060013263,0.0000016242803,0.00020469977,0.00036643693,0.0000068355885,0.00028099955,0.99281985,0.0035689573,0.0009793807,0.0014020492,0.00023120375],"study_design_scores_gemma":[0.0011211059,0.00021407775,3.6340558e-7,0.0005090226,0.00006039988,0.000094653056,0.00069039484,0.9460747,0.011826229,0.0000025499944,0.038793646,0.0006128098],"about_ca_topic_score_codex":0.0010457411,"about_ca_topic_score_gemma":0.00011679976,"teacher_disagreement_score":0.9897366,"about_ca_system_score_codex":0.000471362,"about_ca_system_score_gemma":0.00008202877,"threshold_uncertainty_score":0.9996372},"labels":[],"label_agreement":null},{"id":"W2964066500","doi":"10.1109/tpwrs.2018.2847289","title":"State Estimation in Power Distribution Systems Based on Ensemble Kalman Filtering","year":2018,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Kalman filter; Phasor; Snapshot (computer storage); Electric power system; Estimator; State estimator; Ensemble Kalman filter; Computer science; Estimation; State (computer science); Units of measurement; Power flow; Control theory (sociology); Phasor measurement unit; Extended Kalman filter; Power (physics); Algorithm; Engineering; Mathematics; Statistics; Artificial intelligence","score_opus":0.010025627803237203,"score_gpt":0.2215742930643813,"score_spread":0.2115486652611441,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2964066500","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021949138,0.0000482277,0.9654289,0.000021498814,0.0065762103,0.00079596794,0.00028345792,0.00058841484,0.0043081725],"genre_scores_gemma":[0.9992942,0.000003948529,0.00011341708,0.000019779272,0.000008133637,0.00019155041,0.000031516163,0.00006071525,0.0002767336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978134,0.00019250817,0.0007313624,0.000405461,0.00041526317,0.00044199286],"domain_scores_gemma":[0.9989027,0.00010900414,0.00008985817,0.0006145346,0.0001319166,0.00015201571],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005185555,0.000338626,0.00038554813,0.00030812394,0.00016351842,0.00017077736,0.00016960032,0.00017415568,0.00008627744],"category_scores_gemma":[0.000011349488,0.00034753504,0.00010092144,0.00052829843,0.0000499891,0.0002783317,9.984341e-7,0.00026295954,0.0002734074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060896993,0.00011160791,0.000034483848,0.00014133632,0.00002508367,0.000005830946,0.00044113674,0.9980796,0.0005004536,0.00006001022,0.0004622607,0.0000772961],"study_design_scores_gemma":[0.0006749807,0.00025435354,0.0002765227,0.0004067682,0.00001006191,0.0000109038765,0.00015016097,0.9921864,0.0030899409,0.0000029371058,0.0025768122,0.00036012253],"about_ca_topic_score_codex":0.00013317222,"about_ca_topic_score_gemma":0.00007475621,"teacher_disagreement_score":0.97734505,"about_ca_system_score_codex":0.0006151944,"about_ca_system_score_gemma":0.000040217918,"threshold_uncertainty_score":0.99989766},"labels":[],"label_agreement":null},{"id":"W2972342334","doi":"10.1109/tpwrs.2019.2940288","title":"A Generic Convex Model for a Chance-Constrained Look-Ahead Economic Dispatch Problem Incorporating an Efficient Wind Power Distribution Modeling","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Wind power; Economic dispatch; Electric power system; Computer science; Linear programming; Cumulative distribution function; Convex optimization; Probability density function; Scheduling (production processes); Piecewise; Integer programming; Power (physics); Mathematics; Regular polygon; Engineering","score_opus":0.011837105205935256,"score_gpt":0.2084447719713819,"score_spread":0.19660766676544664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972342334","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15862957,0.000092433176,0.835392,0.000014663129,0.0023425592,0.0022571525,0.00042501927,0.0005128019,0.00033383875],"genre_scores_gemma":[0.99718726,0.000006463397,0.0018635523,0.000012026709,0.000029785855,0.00044439506,0.00009974698,0.0001370584,0.0002196943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975573,0.000069920265,0.00086943724,0.0006294626,0.0002717243,0.0006021943],"domain_scores_gemma":[0.9988482,0.000057692738,0.00018512284,0.0005713672,0.00014535266,0.00019228313],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045344545,0.0004561907,0.0005623264,0.0002337074,0.00019378548,0.00016184911,0.00023824054,0.0002776936,0.000019241426],"category_scores_gemma":[0.0000019592119,0.00049316086,0.00017888115,0.0002828009,0.000026693657,0.00039381615,0.0000017525946,0.0002683462,0.00009331904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004705894,0.000087652705,0.000011197126,0.00019396654,0.00009053792,8.192485e-7,0.0007694115,0.99580586,0.002540677,0.00033872685,0.0000411187,0.000072995215],"study_design_scores_gemma":[0.0010547937,0.00023628559,0.0000014183179,0.00019605062,0.00004546115,0.000026211206,0.00026553447,0.9966865,0.00090922223,0.000019442301,0.000026535878,0.00053251215],"about_ca_topic_score_codex":0.000062365245,"about_ca_topic_score_gemma":0.000026640528,"teacher_disagreement_score":0.8385577,"about_ca_system_score_codex":0.0008186398,"about_ca_system_score_gemma":0.00015661532,"threshold_uncertainty_score":0.999752},"labels":[],"label_agreement":null},{"id":"W2972497666","doi":"10.1109/tpwrs.2019.2940379","title":"Availability Assessment Based Case-Sensitive Power System Restoration Strategy","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Blackout; Reliability engineering; Electric power system; Fault (geology); Renewable energy; Computer science; Risk analysis (engineering); Power (physics); Engineering; Operations research; Electrical engineering","score_opus":0.010087250400512079,"score_gpt":0.22218118507396645,"score_spread":0.21209393467345436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2972497666","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1582889,0.00007985251,0.80732924,0.000025533995,0.010322882,0.0016294802,0.00023852578,0.0010017621,0.021083832],"genre_scores_gemma":[0.99885744,0.0000022556858,0.00011540776,0.000023670143,0.00001679563,0.00018870493,0.000006430514,0.00007216119,0.0007171503],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973627,0.00033436593,0.00076679554,0.0005767624,0.0004728072,0.00048659198],"domain_scores_gemma":[0.9981817,0.00021831866,0.0001154745,0.0010420051,0.00024998598,0.00019249709],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008564455,0.00041247095,0.0005526695,0.00020685325,0.00016257702,0.00014477142,0.00016797292,0.0002922195,0.00012505834],"category_scores_gemma":[0.0000041312023,0.00039719942,0.00021695874,0.0003463396,0.000053089487,0.00035134572,0.0000011458676,0.00047838787,0.00077645667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095715,0.00024551674,0.00008296516,0.0015154002,0.00021796503,0.0003980458,0.00058915565,0.98920673,0.005247464,0.0010806123,0.001217428,0.000103021266],"study_design_scores_gemma":[0.0028781414,0.0013698831,0.00075752573,0.0017768797,0.00015777264,0.0021191884,0.010505021,0.9548564,0.012026817,0.0000068015843,0.011620861,0.0019247046],"about_ca_topic_score_codex":0.00028130243,"about_ca_topic_score_gemma":0.0000992022,"teacher_disagreement_score":0.84056854,"about_ca_system_score_codex":0.0011888371,"about_ca_system_score_gemma":0.00013741227,"threshold_uncertainty_score":0.999848},"labels":[],"label_agreement":null},{"id":"W2974538065","doi":"10.1109/tpwrs.2019.2942257","title":"External System Generator Outage Localization Based on Tie-Line Synchrophasor Measurements","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Generator (circuit theory); Underdetermined system; Electric power system; Computer science; Sensitivity (control systems); Cluster analysis; Line (geometry); Tie line; QR decomposition; Algorithm; Real-time computing; Engineering; Electronic engineering; Power (physics); Mathematics","score_opus":0.015999109615991266,"score_gpt":0.2137159323650173,"score_spread":0.19771682274902602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974538065","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008428973,0.00012692825,0.97319126,0.000009229256,0.0108122,0.0010604722,0.00013338293,0.00084419386,0.0053933836],"genre_scores_gemma":[0.998798,0.000003457417,0.00021887627,0.00006512453,0.000018662111,0.00013961723,0.000010011194,0.00009572024,0.00065049855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99755234,0.00020818229,0.00069022813,0.00044429427,0.00074553763,0.00035943722],"domain_scores_gemma":[0.9987239,0.000051911906,0.000098752535,0.0007531,0.00017595004,0.00019637922],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00044520432,0.0003785508,0.0004433495,0.00027750398,0.00013925118,0.00014106426,0.00021677322,0.00020544138,0.000296088],"category_scores_gemma":[0.0000038569965,0.00036179548,0.00016851378,0.0003449169,0.00002012623,0.00018101635,7.497072e-7,0.00022146892,0.00083996804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005511673,0.00012570573,0.000120908044,0.0005394433,0.000058469737,0.00000616669,0.00010819146,0.99733454,0.0013850663,0.000033085216,0.00018849687,0.000044783137],"study_design_scores_gemma":[0.0011525637,0.0002000738,0.000024058936,0.00051043177,0.000032393298,0.000012752939,0.00012758882,0.9882638,0.0073985667,1.8352688e-7,0.0019072206,0.00037039246],"about_ca_topic_score_codex":0.000028958475,"about_ca_topic_score_gemma":0.000007917891,"teacher_disagreement_score":0.9903691,"about_ca_system_score_codex":0.0006469354,"about_ca_system_score_gemma":0.000052771957,"threshold_uncertainty_score":0.999938},"labels":[],"label_agreement":null},{"id":"W2977609143","doi":"10.1109/tpwrs.2019.2944920","title":"Faster-Than-Real-Time Dynamic Simulation of AC/DC Grids on Reconfigurable Hardware","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Field-programmable gate array; Computer science; Hardware-in-the-loop simulation; Grid; Transient (computer programming); Smart grid; Hardware architecture; Gate array; Nonlinear system; Embedded system; Engineering; Software; Electrical engineering","score_opus":0.00792421621411806,"score_gpt":0.21985972186329653,"score_spread":0.21193550564917846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2977609143","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45712304,0.00006830831,0.51483136,0.000011362,0.008002799,0.0014628897,0.00018229183,0.00062729267,0.017690625],"genre_scores_gemma":[0.9932232,0.000015620704,0.00001694292,0.0000039126867,0.000024438352,0.000089428264,0.0000083308705,0.00007747649,0.006540675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845994,0.00008173641,0.0005573736,0.00030449065,0.0003143266,0.00028212095],"domain_scores_gemma":[0.9991065,0.000099772085,0.0001098283,0.0005118398,0.00008840067,0.000083643004],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00022069486,0.00027394108,0.00042317947,0.00028911946,0.00007638455,0.00005317287,0.0001318323,0.00024748087,0.00029163153],"category_scores_gemma":[0.0000019967385,0.00026908272,0.00016794757,0.00024846793,0.000014913479,0.00024110696,3.951704e-7,0.0002497217,0.0013833712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045869816,0.000050893996,0.000007853863,0.0002730762,0.00009250217,0.0000012510156,0.00029020713,0.92872703,0.06977372,0.0000074198706,0.00007363652,0.0006565358],"study_design_scores_gemma":[0.0009525939,0.0006227446,0.00018429202,0.0008874968,0.000039192913,0.00001884578,0.00036086023,0.9642699,0.027275782,0.0000037843868,0.0048891534,0.000495357],"about_ca_topic_score_codex":0.0002722697,"about_ca_topic_score_gemma":0.000023054989,"teacher_disagreement_score":0.53610015,"about_ca_system_score_codex":0.00021968999,"about_ca_system_score_gemma":0.000018374632,"threshold_uncertainty_score":0.99997616},"labels":[],"label_agreement":null},{"id":"W2998052572","doi":"10.1109/tpwrs.2019.2962177","title":"Development and Integration of Momentary Event Models in Active Distribution System Reliability Assessment","year":2019,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Reliability engineering; Reliability (semiconductor); Context (archaeology); Engineering; Computer science; Event (particle physics); Distributed generation; Power (physics); Renewable energy","score_opus":0.008426361500621904,"score_gpt":0.21677616787102041,"score_spread":0.20834980637039852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2998052572","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.421566,0.000049296512,0.57543045,0.000008787564,0.0014087631,0.0007320323,0.00009221952,0.00008497194,0.00062747655],"genre_scores_gemma":[0.9994045,0.000015477839,0.0002448815,0.0000026309428,0.00000286437,0.00022887289,0.000015228354,0.000018798712,0.000066755114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983961,0.00010014978,0.0006775776,0.00029949663,0.00030274986,0.00022392602],"domain_scores_gemma":[0.99936587,0.000068706046,0.00008652068,0.0003328071,0.00007737953,0.00006871745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005670343,0.00020803811,0.00038061792,0.00011985372,0.000040069717,0.000021752388,0.000104772145,0.000106857195,0.00000612572],"category_scores_gemma":[0.0000014921078,0.00019311935,0.00005748604,0.00019958094,0.000025720326,0.0003027849,0.0000018816925,0.00023130132,0.000010899969],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014502018,0.00037004627,0.000135057,0.0020054604,0.00011867795,0.0000031341376,0.0028120996,0.98461664,0.006323044,0.0019910403,0.000050598457,0.0014292137],"study_design_scores_gemma":[0.0019321217,0.00046185876,0.0046417173,0.0033237753,0.000043436776,0.00003179478,0.010042698,0.9377229,0.039611507,0.00004507946,0.0014384472,0.0007046479],"about_ca_topic_score_codex":0.00022338144,"about_ca_topic_score_gemma":0.000074237134,"teacher_disagreement_score":0.5778385,"about_ca_system_score_codex":0.0013275425,"about_ca_system_score_gemma":0.000056419845,"threshold_uncertainty_score":0.7875179},"labels":[],"label_agreement":null},{"id":"W2999236449","doi":"10.1109/tpwrs.2020.2966913","title":"Assessment of Spare Parts for System Components Using a Markov Model","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Advanced Statistical Process Monitoring","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Markov chain; Computer science; Markov model; Component (thermodynamics); Markov process; Engineering; Mathematics; Operations management; Statistics; Machine learning","score_opus":0.23066038413969034,"score_gpt":0.4251754372255071,"score_spread":0.19451505308581676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2999236449","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0069827256,0.000036499852,0.98917377,0.000052424533,0.0018775507,0.0007063753,0.0005615983,0.00008018868,0.0005288568],"genre_scores_gemma":[0.9748668,7.978876e-7,0.024854453,0.000024142055,0.000024591287,0.00008865196,0.0000013437191,0.00003101298,0.0001081724],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9966841,0.00013730345,0.001033471,0.00056309276,0.0012919173,0.0002901368],"domain_scores_gemma":[0.99764067,0.00088465016,0.00037728122,0.00041022705,0.00044681976,0.00024034348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000639584,0.00020807133,0.0005809029,0.00014626123,0.00022582007,0.00011005907,0.00042001353,0.00008590446,0.000012760522],"category_scores_gemma":[0.00007814001,0.00017671332,0.00016341511,0.00041555933,0.000057016532,0.00026998113,0.0000034659906,0.00016646502,0.000013815085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007635642,0.000071474475,0.00007880656,0.00023701262,0.00004063586,0.0000043468235,0.00031975127,0.9953832,0.002725583,0.00066439953,0.00007875473,0.0003196966],"study_design_scores_gemma":[0.00047371734,0.00012808897,0.000048916867,0.00019150133,0.000037434485,0.00000601058,0.0015538606,0.99603933,0.0010587396,0.00009801838,0.00019192438,0.00017242883],"about_ca_topic_score_codex":0.000020999516,"about_ca_topic_score_gemma":0.0000019565816,"teacher_disagreement_score":0.9678841,"about_ca_system_score_codex":0.0001430769,"about_ca_system_score_gemma":0.00009781391,"threshold_uncertainty_score":0.720616},"labels":[],"label_agreement":null},{"id":"W3007472460","doi":"10.1109/tpwrs.2020.2976834","title":"Test Systems for Voltage Stability Studies","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":90,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Calgary","funders":"","keywords":"Electric power system; Voltage; Stability (learning theory); Computer science; Control theory (sociology); Set (abstract data type); Engineering; Voltage optimisation; Reliability engineering; Control engineering; Task (project management); Voltage regulation; Power (physics); Control (management); Electrical engineering; Systems engineering; Artificial intelligence","score_opus":0.048583947481492445,"score_gpt":0.2537404164297381,"score_spread":0.20515646894824566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007472460","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018980355,0.0021817263,0.98416233,0.00010975342,0.006772357,0.0017248098,0.00074199215,0.0011006618,0.0013083246],"genre_scores_gemma":[0.998813,0.00008160033,0.00007208832,0.000054191478,0.000027661301,0.0006218834,0.0000050317676,0.00007067752,0.00025390467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99804837,0.00008198417,0.0007518014,0.00044321784,0.00029858912,0.00037603083],"domain_scores_gemma":[0.998423,0.0005126615,0.000074887175,0.00047440373,0.00026143616,0.00025362367],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003988171,0.0003405373,0.00061407924,0.0000831952,0.0001865217,0.00011823275,0.00021353441,0.0001522659,0.00004380179],"category_scores_gemma":[0.00006452754,0.0003204143,0.00019974631,0.00034144562,0.0000595972,0.00021235688,0.0000012203894,0.0002112456,0.00009594865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078584126,0.0002123072,0.00013895887,0.0034044276,0.0004737821,0.0000052091036,0.005501858,0.9789753,0.0022553506,0.00020691456,0.0086832745,0.00006401712],"study_design_scores_gemma":[0.0015877106,0.00061714015,0.000030363502,0.00024986212,0.00011950752,0.000016576783,0.008500031,0.9149627,0.0048368583,0.000005274522,0.068150215,0.0009237806],"about_ca_topic_score_codex":0.000018841813,"about_ca_topic_score_gemma":0.0000116567035,"teacher_disagreement_score":0.9969149,"about_ca_system_score_codex":0.00024466735,"about_ca_system_score_gemma":0.000035583915,"threshold_uncertainty_score":0.9999248},"labels":[],"label_agreement":null},{"id":"W3014192641","doi":"10.1109/tpwrs.2020.2984732","title":"Mitigation of Subsynchronous Interactions in Hybrid AC/DC Grid With Renewable Energy Using Faster-Than-Real-Time Dynamic Simulation","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Grid; Converters; Electric power system; MATLAB; Power (physics); Voltage; Electronic engineering; Engineering; Electrical engineering","score_opus":0.010056236374525443,"score_gpt":0.22198225760826137,"score_spread":0.21192602123373594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3014192641","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21708459,0.00005064026,0.7798205,0.000018504346,0.00091279973,0.0004007904,0.00006846146,0.0002503769,0.0013933367],"genre_scores_gemma":[0.999442,0.000010859783,0.0001050541,0.000012425832,0.000041057076,0.000054453816,0.000025924692,0.000079014084,0.00022921304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99819547,0.00012884712,0.0007504536,0.000323083,0.00031673218,0.00028544394],"domain_scores_gemma":[0.99912846,0.00014052053,0.00017583508,0.0002973779,0.00011659829,0.00014122036],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001058132,0.00029672545,0.0004845229,0.00033449338,0.000082909966,0.00008146513,0.00012642036,0.00008336717,0.00009104803],"category_scores_gemma":[0.0000030298359,0.00030186118,0.000121373276,0.0004997768,0.000030535368,0.0005242858,0.0000010397735,0.00016508867,0.00003625039],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009838256,0.000054847384,0.00004266721,0.00009966496,0.00010231677,0.0000067927135,0.00041813182,0.9468965,0.052084778,0.00000269689,0.000022384946,0.00017085182],"study_design_scores_gemma":[0.0009945846,0.00013524422,0.00010715591,0.00028584708,0.000047926416,0.00002098284,0.00027163804,0.9909481,0.006608543,0.0000016100518,0.00029905076,0.00027935865],"about_ca_topic_score_codex":0.002102051,"about_ca_topic_score_gemma":0.000554179,"teacher_disagreement_score":0.7823574,"about_ca_system_score_codex":0.00030546676,"about_ca_system_score_gemma":0.00005286568,"threshold_uncertainty_score":0.9999434},"labels":[],"label_agreement":null},{"id":"W3018864671","doi":"10.1109/tpwrs.2020.2989533","title":"Integrated Modelling and Enhanced Utilization of Power-to-Ammonia for High Renewable Penetrated Multi-Energy Systems","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Ammonia Synthesis and Nitrogen Reduction","field":"Chemical Engineering","cited_by":136,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"National Natural Science Foundation of China","keywords":"Renewable energy; Electric power system; Ammonia; Electricity generation; Power (physics); Ammonia production; Process engineering; Environmental science; Computer science; Engineering; Electrical engineering; Chemistry; Thermodynamics; Physics","score_opus":0.038489011003795176,"score_gpt":0.2357213973312264,"score_spread":0.19723238632743123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3018864671","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059495874,0.00039667462,0.9382657,0.000040401992,0.0008755632,0.0005421611,0.00014778174,0.00018466834,0.000051176],"genre_scores_gemma":[0.9968827,0.00003826262,0.002331067,0.000017342083,0.000019442228,0.00021614126,0.00001578807,0.000072214,0.00040703965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983944,0.00005930828,0.00061122177,0.00044380702,0.00021580404,0.00027544048],"domain_scores_gemma":[0.9990739,0.0000944739,0.00015429698,0.00021923729,0.0002501899,0.00020786349],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012105262,0.00027316224,0.0004751629,0.00015597978,0.00010870844,0.000054814227,0.00012659999,0.00020949754,0.00001542847],"category_scores_gemma":[0.00001348307,0.00026336094,0.00009732372,0.00044106733,0.000025787922,0.00013895743,0.000001435068,0.00012351148,0.0000065025115],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001659597,0.000068418216,5.440307e-7,0.00012674349,0.00009432312,4.3707166e-7,0.00031881907,0.6839998,0.31491187,0.00016695715,0.000037244154,0.00010894417],"study_design_scores_gemma":[0.00042269673,0.00016114605,6.5612363e-7,0.00015542386,0.00004137604,0.000002961742,0.00049372436,0.555569,0.44256788,0.000001574455,0.00040925253,0.00017429699],"about_ca_topic_score_codex":0.0017180556,"about_ca_topic_score_gemma":0.000025004767,"teacher_disagreement_score":0.9373868,"about_ca_system_score_codex":0.00008901432,"about_ca_system_score_gemma":0.000040213617,"threshold_uncertainty_score":0.9999819},"labels":[],"label_agreement":null},{"id":"W3019005994","doi":"10.1109/tpwrs.2020.2989725","title":"Rotor Angle Stability Prediction of Power Systems With High Wind Power Penetration Using a Stability Index Vector","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electric power system; Control theory (sociology); Wind power; Stability (learning theory); Rotor (electric); Engineering; Computer science; Power (physics); Artificial intelligence; Physics; Machine learning; Electrical engineering","score_opus":0.0241684268153288,"score_gpt":0.19839873215791684,"score_spread":0.17423030534258804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3019005994","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57727545,0.00014417863,0.41769573,0.0000130970975,0.0026633062,0.0007603751,0.00045122142,0.00035353203,0.0006431306],"genre_scores_gemma":[0.9996367,0.0000041489525,0.00010392439,0.000011000554,0.00004810214,0.00006917318,0.000013451482,0.00009733083,0.000016167123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973211,0.00019051044,0.0008865306,0.0005372356,0.00063366524,0.00043095334],"domain_scores_gemma":[0.99863034,0.00011542262,0.00019442076,0.0005484651,0.00024695313,0.00026436543],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035686634,0.0004344217,0.0005933498,0.00015789873,0.00016676892,0.00011163844,0.00019219724,0.00028132767,0.00017410255],"category_scores_gemma":[0.000011609942,0.00040416722,0.00015087609,0.000629272,0.00009062935,0.0005322297,0.00000233582,0.00044797803,0.000010707258],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033966408,0.00023763151,0.0022707158,0.00071675907,0.0003096121,0.000008279227,0.0037007432,0.93714464,0.055147298,0.00005638009,0.00004736245,0.000020946976],"study_design_scores_gemma":[0.004848661,0.0042635477,0.010210703,0.0018240801,0.0004027566,0.00014271142,0.007035549,0.82203573,0.14490998,0.0000061228247,0.0022068026,0.002113362],"about_ca_topic_score_codex":0.0005142139,"about_ca_topic_score_gemma":0.00005547439,"teacher_disagreement_score":0.42236128,"about_ca_system_score_codex":0.0003473601,"about_ca_system_score_gemma":0.000108066255,"threshold_uncertainty_score":0.99984103},"labels":[],"label_agreement":null},{"id":"W3019166419","doi":"10.1109/tpwrs.2020.2989632","title":"Power System Loss Divider","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Current divider; AC power; Topology (electrical circuits); Control theory (sociology); Quadratic equation; Wilkinson power divider; Voltage; Operating point; Steady state (chemistry); Power (physics); Power dividers and directional couplers; Computer science; Engineering; Electrical engineering; Mathematics; Voltage divider; Frequency divider; Physics; Geometry","score_opus":0.012354390878831252,"score_gpt":0.19750518085819954,"score_spread":0.1851507899793683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3019166419","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030766255,0.0002738057,0.96619076,0.00015832922,0.0061903377,0.0005804876,0.0001623558,0.0018943361,0.02147297],"genre_scores_gemma":[0.99928325,0.000007870325,0.00007449248,0.00011345446,0.000015243753,0.00010686428,0.000002763338,0.00008563382,0.00031042844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998034,0.00012506338,0.0006314736,0.0004035674,0.00041487205,0.00039104154],"domain_scores_gemma":[0.99889946,0.00006985003,0.00005835078,0.00050652283,0.00009963167,0.00036620107],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001957035,0.00034325113,0.00045739434,0.00011147968,0.00014509626,0.00013570597,0.0002638121,0.00019243846,0.00033079708],"category_scores_gemma":[0.0000050037906,0.00033316165,0.00020159084,0.00044114527,0.000040035557,0.00023927729,0.0000012954866,0.00030843436,0.00097331597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005799218,0.00009745293,0.00008627072,0.00083911244,0.00029272505,0.000051476058,0.0034320168,0.98744625,0.0005626736,0.000683851,0.006407472,0.00004268479],"study_design_scores_gemma":[0.003076682,0.0005792659,0.00024943126,0.00071613473,0.00015027434,0.00026524378,0.0062279915,0.8123569,0.00672306,0.000003213369,0.16725242,0.0023993915],"about_ca_topic_score_codex":0.000016087219,"about_ca_topic_score_gemma":0.0000037711643,"teacher_disagreement_score":0.99620664,"about_ca_system_score_codex":0.00022096845,"about_ca_system_score_gemma":0.000029296003,"threshold_uncertainty_score":0.999912},"labels":[],"label_agreement":null},{"id":"W3020549889","doi":"10.1109/tpwrs.2020.2987982","title":"Transmission Expansion Planning Including TCSCs and SFCLs: A MINLP Approach","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Linearization; Sizing; Mathematical optimization; Transmission line; Electric power transmission; Transmission (telecommunications); Nonlinear programming; Benders' decomposition; Thyristor; Computer science; Nonlinear system; Engineering; Voltage; Mathematics; Electrical engineering","score_opus":0.037710041147947536,"score_gpt":0.2367823013889106,"score_spread":0.19907226024096306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020549889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012206617,0.0009116437,0.9804811,0.00007518183,0.0008964817,0.00046472673,0.000026790842,0.00065356697,0.0042838748],"genre_scores_gemma":[0.9986666,0.00003884446,0.0010300279,0.000058814698,0.0000108617,0.00006321535,0.0000040737664,0.000053206328,0.00007434369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985421,0.00009867432,0.000447315,0.0003693119,0.00027499348,0.000267616],"domain_scores_gemma":[0.9993453,0.000062263214,0.000041274623,0.0002201235,0.00003764953,0.00029339048],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019766159,0.00026858214,0.00035373075,0.000121018,0.00019389259,0.000096781856,0.00012329043,0.00017069442,0.00003391068],"category_scores_gemma":[0.0000037075345,0.00025495264,0.000088421795,0.00031320498,0.000029341,0.0002288778,0.0000012431908,0.00028250305,0.000018050761],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084558604,0.00008264701,0.000038385144,0.00071479636,0.00008990323,0.000009229893,0.013862032,0.9786226,0.005134681,0.00003053168,0.0006329453,0.00069764716],"study_design_scores_gemma":[0.00072923914,0.00012941926,0.0000414934,0.00022219085,0.00003549412,0.00003950603,0.002203791,0.9828903,0.0032186694,0.0000014432438,0.010072621,0.00041583934],"about_ca_topic_score_codex":0.000010720063,"about_ca_topic_score_gemma":5.148345e-7,"teacher_disagreement_score":0.98646,"about_ca_system_score_codex":0.00007029961,"about_ca_system_score_gemma":0.000018328128,"threshold_uncertainty_score":0.9999903},"labels":[],"label_agreement":null},{"id":"W3022740312","doi":"10.1109/tpwrs.2020.2993453","title":"Hidden Convexities in Decentralized Coordination for the Distribution Networks","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Computer science; Distributed computing; Smart grid; Convergence (economics); Grid; Electric power system; Identification (biology); Focus (optics); Mathematical optimization; Decomposition; Distributed generation; Power (physics); Engineering; Mathematics","score_opus":0.013717623207902834,"score_gpt":0.21151595229483716,"score_spread":0.19779832908693432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3022740312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008653595,0.0007587872,0.98606366,0.000584945,0.0030782998,0.00056912727,0.000083218314,0.00015665355,0.000051712406],"genre_scores_gemma":[0.9995441,0.00012879532,0.000008771405,0.000054382745,0.0000360429,0.0001694048,0.00001031595,0.000014038605,0.000034154687],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993566,0.000031950927,0.00020183578,0.00011641078,0.00010835387,0.00018483806],"domain_scores_gemma":[0.99961656,0.00018297226,0.000019900148,0.00010042522,0.000029197474,0.00005091753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103739345,0.000102949816,0.0001293789,0.000024184947,0.00010809545,0.00005058805,0.00011117538,0.00008408597,0.000015519092],"category_scores_gemma":[0.000005207375,0.00008231336,0.00006385122,0.00019861944,0.000033163386,0.00009652978,3.2640574e-7,0.00016341169,0.000010445983],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005454814,0.000020269035,0.000026220056,0.0000691458,0.00003769052,0.0000013063425,0.0010424774,0.9946178,0.00013588612,0.00051246054,0.0031285882,0.0003535691],"study_design_scores_gemma":[0.0005718605,0.000053772652,0.00018006902,0.00004898134,0.000018377566,0.0000034081468,0.0007318169,0.9797571,0.0010484662,0.000006612476,0.017450824,0.00012871885],"about_ca_topic_score_codex":0.00003211618,"about_ca_topic_score_gemma":0.000038569677,"teacher_disagreement_score":0.9908905,"about_ca_system_score_codex":0.00006725556,"about_ca_system_score_gemma":0.000009785642,"threshold_uncertainty_score":0.33566415},"labels":[],"label_agreement":null},{"id":"W3023278317","doi":"10.1109/tpwrs.2020.2991447","title":"Mitigation of Fault Induced Delayed Voltage Recovery (FIDVR) by PV-STATCOM","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"AC power; Grid code; Overvoltage; Grid-connected photovoltaic power system; Photovoltaic system; Fault (geology); Engineering; Control theory (sociology); Sensitivity (control systems); Voltage; Automotive engineering; Computer science; Maximum power point tracking; Electrical engineering; Electronic engineering; Control (management)","score_opus":0.007283450764830418,"score_gpt":0.185163332386383,"score_spread":0.17787988162155258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3023278317","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0363039,0.0004282583,0.96038085,0.000076462624,0.0014008728,0.0003470275,0.00031543078,0.00027903877,0.00046817408],"genre_scores_gemma":[0.99947786,0.00010507317,0.00010411713,0.00008270939,0.000019097057,0.000042320728,0.000024119767,0.000042622378,0.00010205937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900067,0.00003716834,0.0004162676,0.00018668426,0.00018443416,0.00017479384],"domain_scores_gemma":[0.9995362,0.00004326263,0.00007064197,0.00017512422,0.00007002539,0.000104709114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007014862,0.0001751204,0.00025542302,0.000081237275,0.00005205746,0.00003974837,0.00010872276,0.00014022492,0.000067204404],"category_scores_gemma":[0.000003361835,0.00018493808,0.00010597197,0.0002606815,0.000012587418,0.00020419327,4.3404543e-7,0.00019282485,0.00005500596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006415102,0.000041944768,0.000003088217,0.00009764361,0.00016230332,0.0000018371356,0.0006363359,0.7774821,0.21626557,0.0000057619286,0.003809985,0.0014293069],"study_design_scores_gemma":[0.0016355573,0.0005021083,0.000018066186,0.00011943466,0.00010770397,0.000007886256,0.00048030325,0.8147762,0.17367178,0.00000548451,0.008156781,0.0005186872],"about_ca_topic_score_codex":0.00006262485,"about_ca_topic_score_gemma":0.00000818218,"teacher_disagreement_score":0.963174,"about_ca_system_score_codex":0.00005878401,"about_ca_system_score_gemma":0.000017169557,"threshold_uncertainty_score":0.7541556},"labels":[],"label_agreement":null},{"id":"W3024258530","doi":"10.1109/tpwrs.2020.3028047","title":"Roles of Dynamic State Estimation in Power System Modeling, Monitoring and Operation","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":226,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"Savannah River Operations Office, U.S. Department of Energy; U.S. Department of Energy","keywords":"Robustness (evolution); Electric power system; Scalability; Computer science; Reliability engineering; Software; Resilience (materials science); System dynamics; Control engineering; State (computer science); Power system simulation; Distributed computing; Systems engineering; Engineering; Real-time computing; Power (physics)","score_opus":0.010410244632687346,"score_gpt":0.21809148865890712,"score_spread":0.2076812440262198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3024258530","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15883179,0.0002889795,0.839069,0.000019886662,0.00088547857,0.00037672505,0.00004160434,0.00023248994,0.00025400604],"genre_scores_gemma":[0.99949056,0.000027798429,0.00037839042,0.0000027896597,0.0000013159902,0.000050981205,0.0000021723065,0.00003274065,0.000013233734],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99872804,0.0000806227,0.00059008185,0.00023050784,0.00020899088,0.00016176487],"domain_scores_gemma":[0.9995744,0.000027746055,0.000051479732,0.00018567167,0.000061756924,0.000098907374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019787393,0.00017919611,0.0003070188,0.00015137144,0.000049750077,0.000057611876,0.00008096987,0.00009098791,0.0000064891615],"category_scores_gemma":[0.0000039663146,0.00018706905,0.000045419223,0.00021772609,0.000014856292,0.0002664975,9.290471e-7,0.00015124328,0.000010848375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020461617,0.000019438408,0.000052464224,0.00035829464,0.00002498414,0.0000015654575,0.0031282855,0.99492306,0.0013616434,0.00001952251,0.000002316161,0.00008795985],"study_design_scores_gemma":[0.00036229743,0.000057587662,0.000060923794,0.00023512632,0.000009469799,0.0000053776807,0.0015637653,0.99620277,0.0013400011,8.5968685e-7,0.000009877345,0.00015197624],"about_ca_topic_score_codex":0.00004261005,"about_ca_topic_score_gemma":0.000021975638,"teacher_disagreement_score":0.8406588,"about_ca_system_score_codex":0.00016278849,"about_ca_system_score_gemma":0.000019239607,"threshold_uncertainty_score":0.7628454},"labels":[],"label_agreement":null},{"id":"W3026448676","doi":"10.1109/tpwrs.2020.2995787","title":"Implementation of Transient Stability Model of Compressed Air Energy Storage Systems","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"Compressed air energy storage; Transient (computer programming); Electric power system; Energy storage; Compressed air; Engineering; Benchmark (surveying); Stability (learning theory); Inertia; Power (physics); Control theory (sociology); Automotive engineering; Computer science; Mechanical engineering","score_opus":0.015638099320520526,"score_gpt":0.20397419943432732,"score_spread":0.1883361001138068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3026448676","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028333925,0.0004912704,0.9693215,0.000025288256,0.00073269586,0.00037393498,0.00044689834,0.00013859196,0.00013591665],"genre_scores_gemma":[0.99971956,0.000057267473,0.00009195424,0.000012680678,0.0000082882825,0.00006424901,0.000009139978,0.000029032739,0.000007836788],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987823,0.000065616776,0.0005943198,0.00017488094,0.00023148707,0.00015139156],"domain_scores_gemma":[0.999467,0.000030187603,0.000096403346,0.00021014691,0.000112434245,0.00008382826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009272037,0.0001597578,0.00035173143,0.00008204612,0.000032643944,0.000012172632,0.00010983241,0.00007640401,0.00003136794],"category_scores_gemma":[4.9005325e-7,0.00016332914,0.000114547605,0.00018385326,0.000022263252,0.00012224654,4.37845e-7,0.00008473059,0.0000016860132],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037895858,0.000046909372,0.0000038385274,0.00036864253,0.00009127768,3.0885238e-7,0.0013519055,0.9323063,0.065524794,0.000046699715,0.00009049576,0.00013093343],"study_design_scores_gemma":[0.0006798153,0.00010611435,0.000011043833,0.000037836948,0.00004558258,8.2721994e-7,0.00081225974,0.9366889,0.06128375,5.9868756e-7,0.00020917889,0.00012408987],"about_ca_topic_score_codex":0.00031674918,"about_ca_topic_score_gemma":0.000033864693,"teacher_disagreement_score":0.9713856,"about_ca_system_score_codex":0.00005923651,"about_ca_system_score_gemma":0.000029746503,"threshold_uncertainty_score":0.6660369},"labels":[],"label_agreement":null},{"id":"W3031255211","doi":"10.1109/tpwrs.2020.2998490","title":"Participation of Pumped Hydro Storage in Energy and Performance-Based Regulation Markets","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Taif University","keywords":"Market clearing; Linear programming; Energy storage; Profit (economics); Integer programming; Demand response; Clearing; Stochastic programming; Mathematical optimization; Energy management; Computer science; Operations research; Economics; Engineering; Microeconomics; Energy (signal processing); Electricity; Power (physics); Mathematics","score_opus":0.009682630743684615,"score_gpt":0.18894428241055528,"score_spread":0.17926165166687066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031255211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24386345,0.00012564751,0.7546694,0.000028751727,0.00044244784,0.00020650489,0.00000831051,0.00013122837,0.00052425574],"genre_scores_gemma":[0.9997157,0.00003494465,0.00006991867,0.000017882003,0.00000805103,0.000077954115,0.000005182528,0.000032009037,0.00003839351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989476,0.00008991174,0.00042353902,0.00017410111,0.00019777581,0.00016703899],"domain_scores_gemma":[0.99959654,0.000057076908,0.00007138186,0.0001558778,0.000040493433,0.000078630095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014168881,0.00014408141,0.00022693463,0.00021886815,0.000032740067,0.000020506717,0.000059005633,0.000104394516,0.00002173807],"category_scores_gemma":[0.0000040185823,0.0001586501,0.00003327085,0.00047248777,0.000014897982,0.00019564388,3.5395126e-7,0.00008548845,0.0000037702157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073014715,0.000029659559,0.00013335189,0.0002076598,0.000020531716,0.0000011200592,0.0003868774,0.99460196,0.0036848716,0.000015180215,0.000059978323,0.0007857803],"study_design_scores_gemma":[0.000564344,0.00014334936,0.0013868848,0.000113125214,0.000015669739,0.0000016266264,0.000022678796,0.97392124,0.023486592,6.1829473e-7,0.00020365893,0.00014021382],"about_ca_topic_score_codex":0.000024719418,"about_ca_topic_score_gemma":0.000011952275,"teacher_disagreement_score":0.7558522,"about_ca_system_score_codex":0.00009835067,"about_ca_system_score_gemma":0.000021074713,"threshold_uncertainty_score":0.6469563},"labels":[],"label_agreement":null},{"id":"W3031264284","doi":"10.1109/tpwrs.2020.2998097","title":"Measurement-Based Optimal DER Dispatch With a Recursively Estimated Sensitivity Model","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Phasor; Sensitivity (control systems); AC power; Control theory (sociology); Mathematical optimization; Electric power system; Phasor measurement unit; Linear programming; Computer science; Scalability; Voltage; Distributed generation; Power (physics); Engineering; Electronic engineering; Mathematics","score_opus":0.03075506388420535,"score_gpt":0.21593175577233584,"score_spread":0.1851766918881305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3031264284","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039867103,0.00007639504,0.95719147,0.00022113674,0.00052617054,0.0005276366,0.00035413454,0.0009550042,0.00028096468],"genre_scores_gemma":[0.9977556,0.0000021883022,0.0019568193,0.00007720096,0.000011000445,0.00008783146,0.000013334803,0.00008550986,0.000010522668],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99823725,0.000073943855,0.00030498274,0.0003795409,0.0005972878,0.00040700857],"domain_scores_gemma":[0.9991291,0.000028470331,0.00004915427,0.0002861415,0.00023510086,0.00027199293],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019632182,0.00035492826,0.00033596135,0.00008415925,0.00012595442,0.00009116222,0.0001047929,0.00014439334,0.00001596701],"category_scores_gemma":[0.000007229125,0.00034309924,0.000108284046,0.0003826839,0.000046738547,0.00023939322,6.736727e-7,0.00036315006,0.0001200662],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018926825,0.000089684254,0.000013354634,0.000117838936,0.00014209886,0.000029967927,0.00018659158,0.98722434,0.011299317,0.000008308258,0.0006292816,0.000069953276],"study_design_scores_gemma":[0.0008159495,0.00026042678,0.000048131802,0.00021141653,0.00010353772,0.000017680462,0.000072827555,0.976775,0.021193366,3.070503e-7,0.000110143264,0.00039121837],"about_ca_topic_score_codex":0.000044451746,"about_ca_topic_score_gemma":0.00002516279,"teacher_disagreement_score":0.9578885,"about_ca_system_score_codex":0.00032897288,"about_ca_system_score_gemma":0.00009183187,"threshold_uncertainty_score":0.9999021},"labels":[],"label_agreement":null},{"id":"W3037236726","doi":"10.1109/tpwrs.2020.3004906","title":"Analytically Validated SSCI Assessment Technique for Wind Parks in Series Compensated Grids","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Polytechnique Montréal","funders":"","keywords":"Admittance; Wind power; Transient (computer programming); Interconnection; Computer science; Grid; Reliability engineering; Stability (learning theory); Electric power system; Turbine; Field (mathematics); Control engineering; Power (physics); Engineering; Electrical impedance; Mathematics; Electrical engineering; Telecommunications; Machine learning; Aerospace engineering","score_opus":0.011865352299678856,"score_gpt":0.2282530163917758,"score_spread":0.21638766409209695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037236726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012674064,0.0000679605,0.99576163,0.00024776973,0.00066090375,0.0010872416,0.00011439642,0.00033832013,0.00045437974],"genre_scores_gemma":[0.99772185,0.000033582088,0.001821873,0.00005839515,0.000017136677,0.00023259428,0.000022033066,0.000041561845,0.000050972467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989667,0.00004889257,0.00040091196,0.00021870148,0.0001308422,0.00023393627],"domain_scores_gemma":[0.9995882,0.00004623714,0.000033743152,0.00016130431,0.000071600596,0.000098923076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001440701,0.00018865407,0.00030191112,0.0001273377,0.000058828133,0.00007718678,0.00011556511,0.0001369278,0.000048715116],"category_scores_gemma":[0.0000025505594,0.00018878505,0.00008521638,0.00036694438,0.000019085779,0.00015749573,5.798885e-7,0.0002182907,0.000011262304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069046604,0.000049237737,0.000016815091,0.0001167844,0.000093592615,0.0000059828544,0.00017949594,0.9622381,0.03668636,0.000052713385,0.0004024028,0.000089521716],"study_design_scores_gemma":[0.0013674216,0.00033281362,0.000110039065,0.00012571368,0.000064626794,0.000015199115,0.00019117714,0.96328396,0.028069846,0.000008288549,0.006026966,0.00040397316],"about_ca_topic_score_codex":0.000020052383,"about_ca_topic_score_gemma":0.000020330877,"teacher_disagreement_score":0.9964544,"about_ca_system_score_codex":0.00010215545,"about_ca_system_score_gemma":0.000031765438,"threshold_uncertainty_score":0.7698431},"labels":[],"label_agreement":null},{"id":"W3042733693","doi":"10.1109/tpwrs.2020.3009435","title":"Convex Model for Controlled Islanding in Transmission Expansion Planning to Improve Frequency Stability","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Blackout; Islanding; Electric power system; Mathematical optimization; Frequency deviation; Electric power transmission; Control theory (sociology); Linear programming; Stability (learning theory); Automatic frequency control; Quadratic equation; Computer science; Integer programming; Transmission (telecommunications); Power (physics); Engineering; Mathematics; Telecommunications; Electrical engineering","score_opus":0.03063385060299169,"score_gpt":0.24765432270819254,"score_spread":0.21702047210520087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042733693","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020970529,0.00015175999,0.9733354,0.00015479008,0.0013903637,0.0027088996,0.00018089054,0.00040637076,0.00070101453],"genre_scores_gemma":[0.99791956,0.0000050604995,0.0011828402,0.00009349994,0.000008593928,0.000676059,0.000004839734,0.000055131666,0.000054432316],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979951,0.00009986771,0.0008204193,0.00045813134,0.0002512696,0.00037523473],"domain_scores_gemma":[0.9990978,0.00017339007,0.000054732318,0.00028927854,0.00008674268,0.00029804764],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045025517,0.0002963121,0.00067529845,0.00016524256,0.00010975293,0.00006678633,0.00016244585,0.00018415552,0.000045242195],"category_scores_gemma":[0.00001981354,0.0002790823,0.00018836433,0.00030438785,0.00001494514,0.00020893225,7.570925e-7,0.00024696,0.000013355448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004641007,0.000065810345,0.000032915617,0.0003254944,0.000035521432,0.0000018337008,0.008165784,0.96825296,0.022455337,0.000024740919,0.00008890184,0.00008661782],"study_design_scores_gemma":[0.003481749,0.00018715112,0.000009077203,0.00014801067,0.000019155254,0.000001223638,0.00066867896,0.9904523,0.0045586997,0.000008974972,0.00016880273,0.00029618762],"about_ca_topic_score_codex":0.00002325739,"about_ca_topic_score_gemma":0.000013358151,"teacher_disagreement_score":0.97694904,"about_ca_system_score_codex":0.00022752548,"about_ca_system_score_gemma":0.00005658145,"threshold_uncertainty_score":0.99996614},"labels":[],"label_agreement":null},{"id":"W3044758249","doi":"10.1109/tpwrs.2020.3010529","title":"A Novel Methodology to Incorporate Circuit Breaker Active Failure in Reliability Evaluation of Electrical Distribution Networks","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Circuit breaker; Backup; Reliability engineering; Reliability (semiconductor); Engineering; Power-system protection; Incidence matrix; Computer science; Electric power system; Power (physics); Electrical engineering; Node (physics); Structural engineering; Mechanical engineering","score_opus":0.049779693832707424,"score_gpt":0.2623824209914357,"score_spread":0.2126027271587283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044758249","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047590464,0.000065078835,0.94899565,0.00021091769,0.0013570283,0.0012554857,0.0002022654,0.00015254704,0.00017055248],"genre_scores_gemma":[0.999267,0.00000536331,0.0002983072,0.00004570635,0.0000209724,0.00031259842,0.00001269173,0.00002881317,0.000008574993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975021,0.000551334,0.00071918307,0.00043909112,0.0004338858,0.00035439155],"domain_scores_gemma":[0.99870783,0.0002931531,0.00010709469,0.000372454,0.00033839355,0.00018105602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017304767,0.00024019714,0.00054340455,0.00011838984,0.000042063235,0.00001923452,0.0001861737,0.00028422812,0.000020829852],"category_scores_gemma":[0.00013389511,0.00024185775,0.00012866523,0.0010739242,0.000041590312,0.00016603938,0.000001941108,0.0004674943,0.000022457829],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014699635,0.0001204834,0.000033797874,0.00010374368,0.000057264246,0.0000014064303,0.00093204714,0.9894268,0.007592679,0.00016759349,0.00023463796,0.0011825825],"study_design_scores_gemma":[0.0015131724,0.00043258432,0.0020576972,0.00022801332,0.000114462135,0.000029148234,0.00042396993,0.9844383,0.008816678,0.00007854163,0.0014045758,0.0004628567],"about_ca_topic_score_codex":0.00021402912,"about_ca_topic_score_gemma":0.00018208986,"teacher_disagreement_score":0.9516765,"about_ca_system_score_codex":0.00064867,"about_ca_system_score_gemma":0.000092959366,"threshold_uncertainty_score":0.98626727},"labels":[],"label_agreement":null},{"id":"W3046498450","doi":"10.1109/tpwrs.2020.3012917","title":"WAMS-Based Model-Free Wide-Area Damping Control by Voltage Source Converters","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Decoupling (probability); Converters; Voltage source; Network topology; Control theory (sociology); Grid; Controller (irrigation); Voltage; Computer science; Engineering; Topology (electrical circuits); Electronic engineering; Control engineering; Control (management); Electrical engineering","score_opus":0.011538331613860794,"score_gpt":0.18401591904809658,"score_spread":0.1724775874342358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3046498450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008765228,0.00018608915,0.9928435,0.0003660615,0.0016495028,0.00072615384,0.0005378989,0.0012609481,0.0015532902],"genre_scores_gemma":[0.99847144,0.0000051376483,0.00009630931,0.0008738667,0.000005176442,0.00013191062,0.000011788544,0.00009219706,0.00031215925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980433,0.000096772535,0.0006202883,0.0004301043,0.0003971176,0.00041239022],"domain_scores_gemma":[0.99866664,0.00015845145,0.00007500415,0.00064913405,0.000087472814,0.00036330812],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020379057,0.00037259638,0.0005088969,0.00010332717,0.00015366577,0.00012643711,0.00037724577,0.00019365178,0.0001287966],"category_scores_gemma":[0.000015898586,0.0003875234,0.00020922355,0.00028595942,0.000051141193,0.00022243922,0.0000011429256,0.00032849365,0.000096308475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005450503,0.000048480695,0.00003960637,0.00017440767,0.000101897334,0.000002895585,0.0006571938,0.9861038,0.0015489163,0.000008982998,0.011235407,0.000023922208],"study_design_scores_gemma":[0.0017861909,0.00007884733,0.0000023665293,0.00007106124,0.000042262403,0.0000029220523,0.0002236014,0.9872182,0.0017607857,0.0000011539797,0.00842518,0.0003874262],"about_ca_topic_score_codex":0.00004010895,"about_ca_topic_score_gemma":0.000015629505,"teacher_disagreement_score":0.99759495,"about_ca_system_score_codex":0.00018414648,"about_ca_system_score_gemma":0.000049597496,"threshold_uncertainty_score":0.99985766},"labels":[],"label_agreement":null},{"id":"W3082847660","doi":"10.1109/tpwrs.2020.3020856","title":"Integrating Net Benefits Test for Demand Response Into Optimal Power Flow Formulation","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Implementation; Procurement; Computer science; Power flow; Demand response; Electric power system; Reliability engineering; Operations research; Payment; Economics; Mathematical optimization; Power (physics); Electrical engineering; Engineering; Electricity; Mathematics","score_opus":0.012887198309908567,"score_gpt":0.21277737668644545,"score_spread":0.1998901783765369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082847660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03819076,0.00013666478,0.95713156,0.00025118512,0.0025738971,0.0006340256,0.000072872834,0.00057489995,0.0004341161],"genre_scores_gemma":[0.99547243,0.0000062680106,0.003846467,0.00009728298,0.00005905588,0.0002817412,0.000009762474,0.0000881811,0.00013878605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869615,0.000045596036,0.00043354844,0.00030310432,0.00022960937,0.00029198074],"domain_scores_gemma":[0.99913836,0.0003184858,0.000047883852,0.00026977673,0.00007447864,0.00015104515],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002841764,0.00027254914,0.00025851373,0.0001630189,0.00016595508,0.0001136229,0.0001651078,0.0001258369,0.000034920122],"category_scores_gemma":[0.000033169552,0.0002770226,0.0001314585,0.00028836526,0.000012490648,0.0002732848,0.0000016964163,0.00018592125,0.00006274461],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019122002,0.000030496283,0.000008974604,0.000086988846,0.00008912939,0.000002585029,0.0012440184,0.99287647,0.003351002,0.00010946504,0.0017290025,0.00028065543],"study_design_scores_gemma":[0.0006851399,0.0004519712,0.00009930482,0.000109080516,0.000043289743,0.0000054620828,0.00043879237,0.97705823,0.0069417027,0.0000029080923,0.013843444,0.00032069185],"about_ca_topic_score_codex":0.00001672539,"about_ca_topic_score_gemma":0.000020554344,"teacher_disagreement_score":0.9572817,"about_ca_system_score_codex":0.00017394863,"about_ca_system_score_gemma":0.00001708488,"threshold_uncertainty_score":0.9999682},"labels":[],"label_agreement":null},{"id":"W3086616129","doi":"10.1109/tpwrs.2020.3021137","title":"A Simulation-Based Classification Approach for Online Prediction of Generator Dynamic Behavior Under Multiple Large Disturbances","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Robustness (evolution); Phasor measurement unit; Computer science; Electric power system; Phasor; Generator (circuit theory); Decision tree; Data mining; Artificial intelligence; Stability (learning theory); Machine learning; Power (physics)","score_opus":0.038194813365877885,"score_gpt":0.2542055758227632,"score_spread":0.21601076245688533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086616129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009672535,0.00013537362,0.9837065,0.000029054014,0.001105293,0.0013418326,0.0035863642,0.00037640904,0.00004668167],"genre_scores_gemma":[0.9970859,0.0000030848935,0.002056905,0.000027352646,0.000011783559,0.00047435155,0.0002615036,0.000046587058,0.000032512227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998636,0.00006986358,0.00056837127,0.00029608107,0.00022939722,0.00020025416],"domain_scores_gemma":[0.9991653,0.00018553308,0.00010210457,0.00027139302,0.0001658738,0.00010980407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014685278,0.00019432437,0.00028769145,0.00009466044,0.00011049896,0.000033280736,0.0001129533,0.0001460195,0.000020954909],"category_scores_gemma":[0.000015917707,0.00019419681,0.0001448967,0.0002805527,0.000025475118,0.00013466933,4.602369e-7,0.00011940651,0.0000029386724],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004112119,0.0003357706,0.0001659636,0.00028837787,0.000044538974,9.312829e-8,0.0002172377,0.9965129,0.0022883178,0.000020208252,0.00004072769,0.000044729666],"study_design_scores_gemma":[0.001000974,0.00010076197,0.0007731409,0.000023475257,0.00005671247,2.6969772e-7,0.00035870876,0.99639237,0.0005205078,2.418854e-7,0.0006230421,0.00014978535],"about_ca_topic_score_codex":0.0000056284443,"about_ca_topic_score_gemma":0.000016098442,"teacher_disagreement_score":0.9874134,"about_ca_system_score_codex":0.00013502127,"about_ca_system_score_gemma":0.000037256916,"threshold_uncertainty_score":0.7919116},"labels":[],"label_agreement":null},{"id":"W3095602222","doi":"10.1109/tpwrs.2020.3034970","title":"Inertia Emulation Uncorrelated With Electromechanical Dynamics to Improve Frequency Transients Using Center of Inertia (COI) Frequency Signal","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Foundation for Innovative Research Groups of the National Natural Science Foundation of China","keywords":"Emulation; Inertia; Control theory (sociology); SIGNAL (programming language); Hardware emulation; Computer science; Frequency response; Flywheel; Simulation; Engineering; Physics; Electrical engineering; Artificial intelligence; Aerospace engineering","score_opus":0.009446192080041561,"score_gpt":0.20249050523873893,"score_spread":0.19304431315869738,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3095602222","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2212506,0.000041278618,0.7762725,0.000054053256,0.00077975506,0.000798056,0.0001126597,0.00026767983,0.00042345288],"genre_scores_gemma":[0.9994162,0.00000217768,0.0003072093,0.000051715426,0.00003018066,0.000049195725,0.000020000572,0.00009469186,0.000028669956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978374,0.00010110104,0.00084444036,0.00039331627,0.000437987,0.00038573606],"domain_scores_gemma":[0.9990749,0.000040728453,0.00012086664,0.0002995685,0.00018062537,0.00028335932],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010941894,0.00035454202,0.00051874254,0.00022393458,0.000077484416,0.00006362224,0.00018218413,0.00021996486,0.000078306],"category_scores_gemma":[0.0000033584656,0.0003252613,0.0001520171,0.00071218645,0.000019970728,0.000304598,8.2196806e-7,0.00033500462,0.000040142473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014015553,0.00008113726,0.00013233762,0.00011431591,0.00022105627,0.000006663336,0.0006070317,0.7648596,0.23349716,0.00009364815,0.000010581289,0.0002363086],"study_design_scores_gemma":[0.0016216468,0.00067670207,0.000086797314,0.00018115387,0.000092239585,0.000018828938,0.00014150767,0.9909523,0.005813205,0.000005881734,0.000029756919,0.000379974],"about_ca_topic_score_codex":0.0003617134,"about_ca_topic_score_gemma":0.00011014441,"teacher_disagreement_score":0.7781656,"about_ca_system_score_codex":0.00029321964,"about_ca_system_score_gemma":0.00005441797,"threshold_uncertainty_score":0.99991995},"labels":[],"label_agreement":null},{"id":"W3106612986","doi":"10.1109/tpwrs.2020.3042381","title":"Controllability of AC Power Networks With DC Lines","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Model Reduction and Neural Networks","field":"Physics and Astronomy","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Ministry of Research, Innovation and Science","keywords":"Controllability; Controllability Gramian; Reactance; Control theory (sociology); Gramian matrix; Topology (electrical circuits); Mathematics; Power (physics); Electric power transmission; Line (geometry); TRACE (psycholinguistics); Computer science; Voltage; Engineering; Electrical engineering; Physics; Applied mathematics; Control (management); Combinatorics","score_opus":0.014140954799138896,"score_gpt":0.22261871814359158,"score_spread":0.20847776334445267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3106612986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05677715,0.000068965375,0.93878883,0.00040112095,0.0011380792,0.00042266014,0.0000539574,0.00006822999,0.0022809966],"genre_scores_gemma":[0.99930423,0.0000030682384,0.000043565477,0.00010282772,0.00009234673,0.00004943948,0.000002997016,0.000025564419,0.0003759443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998835,0.00008634464,0.00036264997,0.00030243502,0.00019749891,0.00021604054],"domain_scores_gemma":[0.99923503,0.00006593672,0.0001381901,0.00026944603,0.00012316155,0.0001682095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008007682,0.00019999208,0.00036629103,0.0000349301,0.0000931375,0.000035224894,0.00012347334,0.00006620901,0.00047534323],"category_scores_gemma":[5.9730434e-7,0.00015402566,0.00015816475,0.0002518445,0.00006933506,0.000105653846,8.675747e-7,0.00027264073,0.00002106659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068442314,0.00035998033,0.00069603714,0.00003437366,0.00034150245,0.000001986345,0.0005621596,0.9927722,0.0013024621,0.0007826085,0.0016193757,0.0008428647],"study_design_scores_gemma":[0.012907028,0.0050629876,0.00083717116,0.00066700904,0.00065758557,0.000031584586,0.006350457,0.8809881,0.038815714,0.00010174456,0.050893,0.0026875902],"about_ca_topic_score_codex":0.00007760416,"about_ca_topic_score_gemma":0.0000026170208,"teacher_disagreement_score":0.9425271,"about_ca_system_score_codex":0.000012611664,"about_ca_system_score_gemma":0.000034409677,"threshold_uncertainty_score":0.6280984},"labels":[],"label_agreement":null},{"id":"W3107980119","doi":"10.1109/tpwrs.2020.3038850","title":"Flexible Time-Stepping Dynamic Emulation of AC/DC Grid for Faster-Than-SCADA Applications","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Emulation; SCADA; Transient (computer programming); Computer science; Field-programmable gate array; Embedded system; Grid; Smart grid; Engineering; Real-time computing; Simulation; Electrical engineering; Operating system","score_opus":0.011482103862014733,"score_gpt":0.22412655587598682,"score_spread":0.21264445201397209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3107980119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032731523,0.00019433547,0.9902914,0.0000831968,0.0011085613,0.0018104875,0.00028688106,0.00055146945,0.0024005063],"genre_scores_gemma":[0.99833935,0.00000785418,0.00018174935,0.000029038187,0.00006657991,0.00055376405,0.000035010722,0.00007222438,0.00071443943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984801,0.000047156245,0.0006786393,0.00028804966,0.0002544254,0.0002516275],"domain_scores_gemma":[0.9991367,0.00013478182,0.0001317306,0.00033106832,0.00012507898,0.00014062514],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013047882,0.00023948181,0.00041975072,0.00016596443,0.00011898848,0.00007176926,0.00017501121,0.00014874368,0.000054020707],"category_scores_gemma":[0.0000027994356,0.0002534997,0.00020856402,0.00036225579,0.000020397545,0.00024000867,8.4954684e-7,0.00013633666,0.00019958525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045699293,0.000037475587,0.0000051561924,0.00035792126,0.00014798815,2.6726173e-7,0.00040940096,0.95578915,0.04177492,0.00006343198,0.0002607103,0.0011078833],"study_design_scores_gemma":[0.00094726525,0.00012257282,0.000039189978,0.00011090811,0.000060842307,0.000004368355,0.0002530387,0.97785026,0.0053508203,0.0000060756965,0.0149813825,0.00027325412],"about_ca_topic_score_codex":0.00002663194,"about_ca_topic_score_gemma":0.0000064985966,"teacher_disagreement_score":0.99506617,"about_ca_system_score_codex":0.000098284705,"about_ca_system_score_gemma":0.000025762638,"threshold_uncertainty_score":0.9999917},"labels":[],"label_agreement":null},{"id":"W3110874572","doi":"10.1109/tpwrs.2020.3041774","title":"Definition and Classification of Power System Stability – Revisited &amp; Extended","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":1077,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; University of Waterloo","funders":"Engineering and Physical Sciences Research Council","keywords":"Electric power system; Stability (learning theory); Computer science; Task (project management); Power transmission; Power (physics); Control engineering; Power electronics; Work (physics); Control theory (sociology); Reliability engineering; Engineering; Electrical engineering; Voltage; Artificial intelligence; Systems engineering; Machine learning; Mechanical engineering; Control (management)","score_opus":0.026604563801699586,"score_gpt":0.20505052618848915,"score_spread":0.17844596238678956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110874572","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028506037,0.0007917465,0.9667614,0.000056847643,0.00057428685,0.00047126436,0.00014287018,0.00039878488,0.002296774],"genre_scores_gemma":[0.9994231,0.00008089613,0.00037780992,0.000015499625,0.000009512552,0.000045701774,0.000012942661,0.000026725898,0.00000782837],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989843,0.00007893247,0.0004264915,0.00021848339,0.00015990209,0.00013190413],"domain_scores_gemma":[0.99944085,0.000047208425,0.00007567851,0.00023391831,0.00010578685,0.00009656155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014216306,0.00015247196,0.00026421863,0.000080869155,0.000056470104,0.000038340517,0.00006489081,0.000109823406,0.00004539813],"category_scores_gemma":[0.0000050750295,0.00015244796,0.000068448935,0.00023964982,0.00002655064,0.00013626688,4.9849837e-7,0.0001310142,0.00004162498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010271537,0.00063302607,0.00033656816,0.009607234,0.0010968006,0.000010998155,0.011685842,0.3333343,0.6274979,0.0070991023,0.0026802782,0.0049907654],"study_design_scores_gemma":[0.0040064515,0.0006656688,0.0038364052,0.0010903873,0.0004263565,0.00008061093,0.0036141681,0.9597285,0.016635174,0.00003174721,0.008482176,0.0014023932],"about_ca_topic_score_codex":0.000009285577,"about_ca_topic_score_gemma":0.0000037707603,"teacher_disagreement_score":0.97091705,"about_ca_system_score_codex":0.000070605565,"about_ca_system_score_gemma":0.000011205449,"threshold_uncertainty_score":0.62166476},"labels":[],"label_agreement":null},{"id":"W3111538979","doi":"10.1109/tpwrs.2020.3045379","title":"Measurement-Based Fast Coordinated Voltage Control for Transmission Grids","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Waterloo","funders":"Electric Power Research Institute","keywords":"AC power; Control theory (sociology); Voltage optimisation; Voltage; Voltage regulation; Robustness (evolution); Electric power system; Controller (irrigation); Engineering; Computer science; Power control; Voltage controller; Control engineering; Voltage source; Power (physics); Control (management); Voltage droop; Electrical engineering","score_opus":0.012648552818865457,"score_gpt":0.1894365497304353,"score_spread":0.17678799691156985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3111538979","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011296699,0.0007986471,0.99543715,0.000281321,0.0013255529,0.0010493881,0.00017871118,0.0006517287,0.00016456142],"genre_scores_gemma":[0.99921566,0.000016219412,0.00017069504,0.00019299111,0.00003457644,0.00025455173,0.000008010159,0.00006632069,0.000040972736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988296,0.000038133938,0.00035997786,0.00024447474,0.00025111347,0.0002767169],"domain_scores_gemma":[0.99941844,0.000035867564,0.000039202754,0.00015795772,0.00016330284,0.00018521694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016139574,0.00024007256,0.00030676875,0.000093847106,0.000125117,0.00006956107,0.00012733371,0.00013332484,0.000055857017],"category_scores_gemma":[0.0000033773358,0.00023015277,0.0001823928,0.00021267693,0.000014734228,0.0001092182,1.1530868e-7,0.00016413437,0.00003460925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020780353,0.00005004352,0.0000015404598,0.00021488997,0.00012243648,0.0000019249965,0.00013813298,0.94080114,0.05396949,0.00000570674,0.0012662099,0.0032206608],"study_design_scores_gemma":[0.003606968,0.00023818396,0.000003897804,0.00010322592,0.00009357377,0.0000016084414,0.000050741884,0.9576612,0.017052697,6.769763e-7,0.02092793,0.0002592569],"about_ca_topic_score_codex":0.000012378264,"about_ca_topic_score_gemma":0.00000363285,"teacher_disagreement_score":0.9991027,"about_ca_system_score_codex":0.00009659171,"about_ca_system_score_gemma":0.000034155095,"threshold_uncertainty_score":0.93853575},"labels":[],"label_agreement":null},{"id":"W3118372329","doi":"10.1109/tpwrs.2021.3049742","title":"Self-Scheduling Models of a CAES Facility Under Uncertainties","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Centres of Excellence","keywords":"Scheduling (production processes); Compressed air energy storage; Mathematical optimization; Computer science; Monte Carlo method; Hedge; Energy storage; Mathematics; Power (physics)","score_opus":0.01421400205930789,"score_gpt":0.20623876848401948,"score_spread":0.19202476642471158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118372329","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013836279,0.0011157241,0.9785172,0.000016483775,0.0023419159,0.0002679052,0.00008376285,0.0005357364,0.003285032],"genre_scores_gemma":[0.99819744,0.00012627846,0.0011982701,0.000008765079,0.000007300446,0.00005790956,0.0000055570376,0.000034507222,0.00036398886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850625,0.00010418682,0.00053917145,0.0002598239,0.00031814017,0.0002724008],"domain_scores_gemma":[0.9991042,0.00009335712,0.000065379965,0.0004370258,0.00022073237,0.00007927658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018805945,0.00021965217,0.0003648384,0.00016844484,0.00007859561,0.000039528564,0.00012193771,0.00016415847,0.000033457432],"category_scores_gemma":[0.0000030702965,0.00023547983,0.00013603059,0.0005138936,0.00002037457,0.0002429937,8.1583255e-7,0.0002069828,0.000025980356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006462903,0.00007198077,0.0000048684333,0.00032903874,0.00020708468,0.0000039220995,0.0009716742,0.9963432,0.0016787305,0.00028720207,0.00005235314,0.000043499098],"study_design_scores_gemma":[0.00036566384,0.000050790262,0.0000050919857,0.00015053037,0.00006482686,0.00004408674,0.0012162883,0.9665676,0.03079855,0.00004432429,0.00038960116,0.00030268772],"about_ca_topic_score_codex":0.00008074765,"about_ca_topic_score_gemma":0.000030133446,"teacher_disagreement_score":0.9843612,"about_ca_system_score_codex":0.00022657117,"about_ca_system_score_gemma":0.00009496413,"threshold_uncertainty_score":0.9602589},"labels":[],"label_agreement":null},{"id":"W3119066328","doi":"10.1109/tpwrs.2021.3050150","title":"Short-Term Demand Prediction Using an Ensemble of Linearly-Constrained Estimators","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Microgrid; Perceptron; Artificial neural network; Estimator; Stability (learning theory); Term (time); Ensemble learning; Grid; Mathematical optimization; Artificial intelligence; Machine learning; Control (management); Mathematics; Statistics","score_opus":0.022597094172229288,"score_gpt":0.23700113777293355,"score_spread":0.21440404360070425,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119066328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42821634,0.00014428826,0.5682999,0.0000011567469,0.0022309322,0.00007024156,0.0000596999,0.00018384475,0.0007936025],"genre_scores_gemma":[0.9989157,0.000016412068,0.00086356,0.0000033154342,0.000038340266,0.000012576631,0.000010415461,0.00005058263,0.000089109686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988444,0.00005284201,0.00043912808,0.00021971944,0.00020336262,0.00024053661],"domain_scores_gemma":[0.99940497,0.00004866488,0.00003768334,0.00029423824,0.00008929065,0.00012516721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013204254,0.00019557631,0.00027396396,0.00013948481,0.000104026054,0.000053474654,0.000079620986,0.00015286158,0.000035223842],"category_scores_gemma":[0.000002718244,0.00021041013,0.00010727269,0.00025854993,0.00003562312,0.00024756868,6.5764175e-7,0.00019288382,0.000004455319],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008184952,0.00008450234,0.0002235903,0.00013116533,0.00010785705,0.00002301037,0.0004810489,0.91224927,0.08585215,0.000032420376,0.000011255338,0.0007955685],"study_design_scores_gemma":[0.0004247711,0.00012505952,0.00018680606,0.00052823976,0.00010377574,0.00031723254,0.00034120952,0.7452153,0.25224897,0.000005214015,0.00018009779,0.00032333063],"about_ca_topic_score_codex":0.000027700315,"about_ca_topic_score_gemma":0.000024661604,"teacher_disagreement_score":0.57069933,"about_ca_system_score_codex":0.00006131991,"about_ca_system_score_gemma":0.0000422898,"threshold_uncertainty_score":0.8580276},"labels":[],"label_agreement":null},{"id":"W3126626907","doi":"10.1109/tpwrs.2021.3057523","title":"Hybrid Deep Learning for Dynamic Total Transfer Capability Control","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"National Natural Science Foundation of China","keywords":"Reinforcement learning; Computer science; Transfer of learning; Generalization; Artificial intelligence; Deep learning; Control (management); Machine learning; Mathematics","score_opus":0.005832751378909101,"score_gpt":0.20409706742967929,"score_spread":0.1982643160507702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126626907","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025548479,0.0004455344,0.9666548,0.000039527637,0.0045443852,0.00078463164,0.00021852544,0.0005941914,0.0011699466],"genre_scores_gemma":[0.99864364,0.00001513668,0.00012999037,0.000020606136,0.0000074653663,0.00033302704,0.000016161706,0.00006688987,0.00076706836],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99820954,0.00019043047,0.0005634334,0.00040852075,0.00023879496,0.00038926533],"domain_scores_gemma":[0.9989571,0.00022757384,0.00002405693,0.0004241479,0.00020543917,0.00016168598],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033413665,0.00027865247,0.00045359504,0.000093480936,0.0002026457,0.00010062125,0.0001062983,0.00013432051,0.00021311412],"category_scores_gemma":[0.000014947324,0.0002974639,0.0003075239,0.00017592554,0.000036724025,0.00016595393,3.6052717e-7,0.00030769562,0.000045696164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004455291,0.0001075241,0.000019778934,0.00026781906,0.00015484751,0.0000067304936,0.00041771767,0.9964419,0.0021429409,0.000046361456,0.000037295646,0.00031255986],"study_design_scores_gemma":[0.0016568982,0.00011175974,0.00010497675,0.000059640344,0.00007239865,0.00010108313,0.00038729887,0.9892571,0.0047151586,0.000008331357,0.0031072195,0.00041814276],"about_ca_topic_score_codex":0.000014334975,"about_ca_topic_score_gemma":0.000055561053,"teacher_disagreement_score":0.9730952,"about_ca_system_score_codex":0.00026052943,"about_ca_system_score_gemma":0.00004812861,"threshold_uncertainty_score":0.9999477},"labels":[],"label_agreement":null},{"id":"W3129363353","doi":"10.1109/tpwrs.2021.3058642","title":"An Online Network Model-Free Wide-Area Voltage Control Method Using PMUs","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Phasor; Phasor measurement unit; Network topology; Units of measurement; Electric power system; Voltage; AC power; Sensitivity (control systems); Computer science; Transmission (telecommunications); Engineering; Electronic engineering; Control theory (sociology); Process (computing); Topology (electrical circuits); Power (physics); Control engineering; Control (management); Electrical engineering; Computer network","score_opus":0.029384974085691327,"score_gpt":0.25822257596864473,"score_spread":0.2288376018829534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129363353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023007856,0.00047138883,0.98959744,0.00003044418,0.004617481,0.00045310336,0.0006138827,0.0006956143,0.0012198791],"genre_scores_gemma":[0.98387367,0.000016174963,0.015436539,0.00012669651,0.00002228373,0.000038457776,0.00001929558,0.00009498945,0.00037189908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976519,0.0003014053,0.00071358564,0.00047583616,0.00036554213,0.000491739],"domain_scores_gemma":[0.9979741,0.00018253796,0.00007753746,0.0012537177,0.0002376686,0.00027443477],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00050457194,0.0003610374,0.0005920051,0.0001229982,0.0001948837,0.00015052708,0.0003018142,0.0002478932,0.00016066818],"category_scores_gemma":[0.000013898682,0.0003809439,0.00021235964,0.0004938584,0.000027302694,0.00032809886,0.000001605766,0.00036047905,0.000016866796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024571202,0.00015937827,0.000028547862,0.00007922582,0.00014593218,0.000018856941,0.000274791,0.996998,0.0017251633,0.00006928044,0.00041864728,0.000057618192],"study_design_scores_gemma":[0.0009284375,0.00004486494,0.000017823117,0.000103919454,0.00008406509,0.000057804962,0.00024018266,0.9962936,0.00052245916,0.000025933277,0.0013027295,0.00037817488],"about_ca_topic_score_codex":0.00006633204,"about_ca_topic_score_gemma":0.0002083102,"teacher_disagreement_score":0.98157287,"about_ca_system_score_codex":0.00025140744,"about_ca_system_score_gemma":0.000108957756,"threshold_uncertainty_score":0.9998642},"labels":[],"label_agreement":null},{"id":"W3129544273","doi":"10.1109/tpwrs.2021.3060427","title":"A Framework for Power System Operational Planning Under Uncertainty Using Coherent Risk Measures","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Electric power system; Reliability engineering; Reliability (semiconductor); Risk management; Computer science; Wind power; Mathematical optimization; Conic section; Operations research; Risk analysis (engineering); Engineering; Power (physics); Mathematics; Economics","score_opus":0.03224672642030193,"score_gpt":0.26534322055050663,"score_spread":0.2330964941302047,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129544273","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021836955,0.0013801216,0.9633413,0.000035281533,0.011082265,0.00081410294,0.00043272297,0.00050948554,0.0005677749],"genre_scores_gemma":[0.99716073,0.00001790199,0.0021104044,0.000046349825,0.000059259863,0.00031887402,0.0000075445832,0.00008398688,0.00019493606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99770063,0.00019997903,0.0006655182,0.0004844671,0.00044637677,0.00050304685],"domain_scores_gemma":[0.99843353,0.00037391725,0.00010125577,0.0005751347,0.0003407629,0.00017542749],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00051176065,0.00036520924,0.0005141286,0.00012632164,0.00039050507,0.0002020779,0.00018711115,0.00031797687,0.000036578425],"category_scores_gemma":[0.000027269996,0.0003533528,0.0002833122,0.00029745893,0.000043775704,0.0001821717,0.0000017504511,0.0004551118,0.00003677748],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000455993,0.00006778241,0.000019154917,0.00030383043,0.00032668555,0.000012185211,0.00068513467,0.9941238,0.0011280125,0.0028741537,0.00037470527,0.000038928258],"study_design_scores_gemma":[0.0017949498,0.0002381607,0.000082181396,0.0044607352,0.0003049492,0.0004155483,0.011362945,0.9474237,0.006989701,0.00024733157,0.02527905,0.0014007458],"about_ca_topic_score_codex":0.0001096434,"about_ca_topic_score_gemma":0.00003185452,"teacher_disagreement_score":0.9753238,"about_ca_system_score_codex":0.00072088203,"about_ca_system_score_gemma":0.000158121,"threshold_uncertainty_score":0.9998918},"labels":[],"label_agreement":null},{"id":"W3134460430","doi":"10.1109/tpwrs.2021.3062906","title":"Emulating Synchrophasor Frequency Measurements With Transient Stability Simulation","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Phasor; Transient (computer programming); Frequency domain; Control theory (sociology); Computation; Phasor measurement unit; Stability (learning theory); Electric power system; Computer science; Units of measurement; Real Time Digital Simulator; Frequency response; Electronic engineering; Engineering; Algorithm; Power (physics); Electrical engineering","score_opus":0.033257116798400696,"score_gpt":0.23600486646968602,"score_spread":0.20274774967128534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134460430","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06808467,0.0002161842,0.9238006,0.000016560329,0.0021253102,0.0005463033,0.000074858544,0.00051826757,0.0046172347],"genre_scores_gemma":[0.9986802,0.0000039628803,0.0010769238,0.000015726982,0.000005186382,0.00008734681,0.00000753355,0.000057502497,0.00006561962],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99788094,0.00017343601,0.0006096817,0.0004244096,0.0005768121,0.0003346998],"domain_scores_gemma":[0.99870694,0.00010723284,0.00006131643,0.00060262997,0.00035758218,0.00016430364],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032998185,0.00029534462,0.00036219726,0.00009987591,0.00019278571,0.0001114504,0.00010595431,0.00013261505,0.00036501596],"category_scores_gemma":[0.000009959332,0.00027799982,0.00012277221,0.0004884762,0.000036143003,0.000280688,4.765604e-7,0.00022959191,0.000040113446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002184679,0.0001515129,0.00022726614,0.00019722355,0.00011860327,0.000008601893,0.0009426883,0.9948542,0.0033798371,0.000011037699,0.000009925059,0.000077264864],"study_design_scores_gemma":[0.0016965215,0.000204018,0.0007301763,0.00037225435,0.00010443396,0.000043236985,0.0010432325,0.9715663,0.022866677,0.0000047639096,0.0005926093,0.0007757469],"about_ca_topic_score_codex":0.000031256226,"about_ca_topic_score_gemma":0.0000910056,"teacher_disagreement_score":0.9305955,"about_ca_system_score_codex":0.00037527262,"about_ca_system_score_gemma":0.00008256303,"threshold_uncertainty_score":0.9999672},"labels":[],"label_agreement":null},{"id":"W3136875321","doi":"10.1109/tpwrs.2021.3067445","title":"Examining the Economic Optimality of Automatic Generation Control","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Science Foundation of Sri Lanka; National Renewable Energy Laboratory; U.S. Department of Energy","keywords":"Automatic Generation Control; Economic dispatch; Context (archaeology); Operating point; Control theory (sociology); Computer science; Generator (circuit theory); Controller (irrigation); Control (management); Control engineering; Steady state (chemistry); Tie line; Point (geometry); Electric power system; State (computer science); Electricity generation; Power (physics); Engineering; Mathematics","score_opus":0.021644817023405774,"score_gpt":0.21572721955631252,"score_spread":0.19408240253290676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136875321","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.080713116,0.001278302,0.9024013,0.000043233576,0.011000381,0.00047858304,0.00011491862,0.00028811555,0.0036820394],"genre_scores_gemma":[0.99929136,0.000017941573,0.00010082868,0.000025112342,0.00006039693,0.00018088648,0.0000026812536,0.000046771966,0.0002740356],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983494,0.00023537662,0.0007191755,0.0002394368,0.0002122502,0.00024434613],"domain_scores_gemma":[0.9988312,0.00022712185,0.00010683183,0.00068744435,0.00008487142,0.00006252896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047453563,0.00021494021,0.00040816618,0.000089557034,0.00010572283,0.00008972133,0.00019637425,0.00012283464,0.00013963594],"category_scores_gemma":[0.0000066343096,0.00018495652,0.00013423462,0.0001386163,0.00004762082,0.00017567074,5.6094e-7,0.00020383945,0.00010321197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003603784,0.000023179029,0.000016675125,0.00011589189,0.00029449593,0.000007103536,0.00045151025,0.9659979,0.031816404,0.00024141523,0.0007103386,0.000321486],"study_design_scores_gemma":[0.0007313246,0.000063115775,0.00007990471,0.0001133709,0.00008150664,0.00007608835,0.00035330135,0.97146,0.02574459,0.000004092182,0.0010632307,0.00022948638],"about_ca_topic_score_codex":0.0001145906,"about_ca_topic_score_gemma":0.000071492126,"teacher_disagreement_score":0.9185782,"about_ca_system_score_codex":0.0003069227,"about_ca_system_score_gemma":0.00009789206,"threshold_uncertainty_score":0.75423074},"labels":[],"label_agreement":null},{"id":"W3137836526","doi":"10.1109/tpwrs.2021.3065395","title":"Resiliency-Oriented Planning of Transmission Systems and Distributed Energy Resources","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Load Shedding; Electric power transmission; Electric power system; Mathematical optimization; Distributed generation; Benders' decomposition; Transmission (telecommunications); Transmission system; Reliability engineering; Engineering; Computer science; Linear programming; Power (physics); Renewable energy; Electrical engineering; Mathematics","score_opus":0.0056886044313368585,"score_gpt":0.20854764001904688,"score_spread":0.20285903558771,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3137836526","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1144241,0.0028417567,0.88108623,0.0000117472255,0.0007445548,0.00007937315,0.00010233573,0.00012382865,0.0005860687],"genre_scores_gemma":[0.9995532,0.000120350276,0.000061516635,0.0000043225887,0.00001259085,0.000021711514,0.000011562659,0.000021934753,0.00019283689],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985586,0.00013007205,0.00048286843,0.00027961237,0.00030693866,0.00024192165],"domain_scores_gemma":[0.9992717,0.000110826804,0.000055955035,0.00033066713,0.000111674104,0.000119182136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015027223,0.00019898162,0.0003886177,0.00018311547,0.00014703818,0.000051385792,0.000095620475,0.0001648837,0.000032450447],"category_scores_gemma":[0.000003906074,0.00018263717,0.00011263805,0.00056892924,0.00006477606,0.00012626147,8.4564135e-7,0.00019866579,0.0000016200805],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026308748,0.00003797349,0.000061149316,0.00025614057,0.00013101086,0.000017496255,0.00068445964,0.9862152,0.011858706,0.00014717459,0.00012899104,0.00043539796],"study_design_scores_gemma":[0.0012772693,0.00030287338,0.00073025783,0.0017099762,0.00035957491,0.00026202094,0.012114218,0.785914,0.1547965,0.00002804,0.04153317,0.0009720966],"about_ca_topic_score_codex":0.0001549638,"about_ca_topic_score_gemma":0.000010206938,"teacher_disagreement_score":0.8851291,"about_ca_system_score_codex":0.00005875095,"about_ca_system_score_gemma":0.000026847267,"threshold_uncertainty_score":0.7447728},"labels":[],"label_agreement":null},{"id":"W3155016304","doi":"10.1109/tpwrs.2021.3072341","title":"Incorporating Multi-Year Asset Replacement Time Into Calculation of Asset's Expected Annual Unavailability Due to End-of-Life Failure","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba; Manitoba Hydro","funders":"","keywords":"Unavailability; Reliability engineering; Asset (computer security); Investment (military); Probabilistic logic; Risk analysis (engineering); Asset management; Engineering; Computer science; Actuarial science; Economics; Business; Finance","score_opus":0.00944572469184722,"score_gpt":0.22866685733561082,"score_spread":0.2192211326437636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3155016304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2115715,0.00010630186,0.7849719,0.0000715284,0.0016817542,0.0006967528,0.00036532246,0.00022284585,0.0003120891],"genre_scores_gemma":[0.9963235,0.0000021244562,0.003190003,0.000012772041,0.000015301133,0.00011279539,0.000023027016,0.000043085525,0.0002773442],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9974583,0.00027544537,0.0010811612,0.00044999333,0.00045396827,0.0002811735],"domain_scores_gemma":[0.99810946,0.0001761875,0.00018824957,0.0008042345,0.0005279029,0.00019396534],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006663831,0.00027723968,0.00064666325,0.0001809003,0.00008018825,0.00003217507,0.00017820425,0.00021584585,0.0001168295],"category_scores_gemma":[0.000094890536,0.00029030463,0.0001767061,0.00065293873,0.00005634513,0.00023273921,0.0000048166958,0.00025007653,0.00007909782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000317919,0.0011097693,0.0010257928,0.0030397873,0.000761636,0.000035312925,0.011134739,0.7802779,0.1966058,0.00029343183,0.005048493,0.00034938293],"study_design_scores_gemma":[0.008975322,0.002195524,0.007381132,0.005553685,0.00042390323,0.00021788783,0.02357293,0.32500657,0.6002089,0.00006015355,0.022576736,0.0038272636],"about_ca_topic_score_codex":0.00031052894,"about_ca_topic_score_gemma":0.00039458432,"teacher_disagreement_score":0.7847521,"about_ca_system_score_codex":0.00031738356,"about_ca_system_score_gemma":0.00017259285,"threshold_uncertainty_score":0.99995494},"labels":[],"label_agreement":null},{"id":"W3157209029","doi":"10.1109/tpwrs.2021.3077391","title":"Hybrid Average-Value/Detailed Modeling of Line-Commutated AC–DC Converters With Internal Faults For Electromagnetic Transient Simulations","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Transient (computer programming); Converters; Computer science; Power (physics); Line (geometry); Hybrid system; Electric power system; Control theory (sociology); Electronic engineering; Voltage; Engineering; Electrical engineering; Mathematics; Physics; Artificial intelligence","score_opus":0.010264663722395236,"score_gpt":0.21780587596413023,"score_spread":0.207541212241735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3157209029","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26471218,0.00015302046,0.73279035,0.000016611444,0.0011326498,0.0007044242,0.00014598461,0.00019390925,0.0001508303],"genre_scores_gemma":[0.9989675,0.00001568312,0.00040674614,0.000011235024,0.000021324253,0.00019308469,0.000020110243,0.00007739392,0.0002868931],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983784,0.00008485073,0.0006418949,0.0003012046,0.0002746902,0.00031897242],"domain_scores_gemma":[0.9991232,0.00008698883,0.00007489214,0.00034732523,0.00026516893,0.00010240949],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013439657,0.00027538347,0.0004279857,0.00019526586,0.00013133754,0.000052083044,0.00011834932,0.000110293746,0.000033015494],"category_scores_gemma":[0.0000035435485,0.0002625346,0.00018327628,0.0002525577,0.000023411621,0.00017246035,5.4872794e-7,0.00027591764,0.000008100984],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012496175,0.000089091074,0.0000016535812,0.00025829705,0.0002716191,0.00000847176,0.00067878456,0.9475623,0.050768696,0.000011515855,0.000013980314,0.00021066498],"study_design_scores_gemma":[0.0016462591,0.00048833026,0.0000038272087,0.0003816088,0.0000935292,0.000116896605,0.00023540818,0.943252,0.053276375,0.0000057479565,0.00023487,0.00026513738],"about_ca_topic_score_codex":0.00013751548,"about_ca_topic_score_gemma":0.000087791515,"teacher_disagreement_score":0.7342553,"about_ca_system_score_codex":0.0001399593,"about_ca_system_score_gemma":0.000057238758,"threshold_uncertainty_score":0.9999827},"labels":[],"label_agreement":null},{"id":"W3159761231","doi":"10.1109/tpwrs.2021.3074789","title":"Gas Network's Impact on Power System Voltage Security","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Science Foundation Ireland","keywords":"Electricity; Electric power system; AC power; Electric power transmission; Pipeline transport; Voltage; Power to gas; Electricity generation; Electric power; Engineering; Computer science; Power (physics); Electrical engineering; Mechanical engineering; Physics","score_opus":0.004963887209179512,"score_gpt":0.19999998710696945,"score_spread":0.19503609989778994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3159761231","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026976518,0.00058528245,0.91090626,0.000017764436,0.01664502,0.00051902316,0.00020675563,0.001744183,0.042399175],"genre_scores_gemma":[0.9980326,0.00003128207,0.000062961706,0.00003081104,0.00009348881,0.00013985313,0.000026820398,0.00017440606,0.0014077732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99737173,0.00021993266,0.0007151514,0.000502084,0.00050517044,0.0006859402],"domain_scores_gemma":[0.9983689,0.00011889641,0.00010226073,0.0008845602,0.00028084952,0.00024450503],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032405244,0.0005592037,0.00061689364,0.00024425678,0.00022462674,0.00022211629,0.00022096075,0.00043111114,0.00025326156],"category_scores_gemma":[0.0000048008433,0.00051275827,0.00035994142,0.0008117647,0.000027503935,0.0002528024,0.0000013083114,0.00062670524,0.00053401623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003810575,0.00007959962,0.000007300774,0.00015485595,0.0003496213,0.00011059137,0.00044200753,0.99127614,0.00078733504,0.00091885385,0.0058041397,0.000031460328],"study_design_scores_gemma":[0.0015509488,0.0005439741,0.00005043826,0.0025933497,0.00017462937,0.0008538695,0.0021412114,0.95088,0.021587577,0.000021819535,0.017904932,0.0016972881],"about_ca_topic_score_codex":0.00024029703,"about_ca_topic_score_gemma":0.00007809493,"teacher_disagreement_score":0.9710561,"about_ca_system_score_codex":0.0009945226,"about_ca_system_score_gemma":0.00009064354,"threshold_uncertainty_score":0.9997324},"labels":[],"label_agreement":null},{"id":"W3159770993","doi":"10.1109/tpwrs.2021.3075641","title":"Hierarchical Coordinated Fast Frequency Control Using Inverter-Based Resources","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Waterloo","funders":"Electric Power Research Institute","keywords":"Automatic frequency control; Flexibility (engineering); Inverter; Computer science; Electric power system; Inertia; Grid; Renewable energy; Power (physics); Distributed generation; Automatic Generation Control; Power control; Control (management); Control theory (sociology); Control engineering; Engineering; Telecommunications; Electrical engineering","score_opus":0.008189842930531415,"score_gpt":0.19400095496207748,"score_spread":0.18581111203154607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3159770993","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017678786,0.0008156608,0.97794074,0.00006787498,0.0020110295,0.00022811141,0.00011059423,0.0003946505,0.0007525438],"genre_scores_gemma":[0.99923956,0.000013505555,0.00039780085,0.00010310332,0.000028115017,0.000038587896,0.000007207037,0.00005031513,0.00012177866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881023,0.00012718016,0.00034923578,0.00024233114,0.00018454244,0.00028648635],"domain_scores_gemma":[0.99937093,0.00007208904,0.00003660822,0.000286397,0.000114064074,0.00011990607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000096214906,0.00021070841,0.00029195863,0.00016736565,0.00014178526,0.00011718669,0.00010682177,0.00015800839,0.0001664431],"category_scores_gemma":[0.0000027327444,0.00021528738,0.00012992216,0.0003556333,0.000034496177,0.00011338719,3.5274888e-7,0.00028544094,0.00003908841],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023151402,0.00006583289,0.000020742713,0.0000535907,0.00011814633,0.000033793593,0.00013844128,0.9709512,0.027811112,0.000012018512,0.00010172294,0.00067025697],"study_design_scores_gemma":[0.0013736677,0.000048173162,0.000022269236,0.00011651119,0.000062611296,0.000038360693,0.00008649849,0.99241614,0.0046254583,0.000003870542,0.00096182467,0.00024464002],"about_ca_topic_score_codex":0.00007746821,"about_ca_topic_score_gemma":0.000032098837,"teacher_disagreement_score":0.9815608,"about_ca_system_score_codex":0.00012073594,"about_ca_system_score_gemma":0.000052517586,"threshold_uncertainty_score":0.87791646},"labels":[],"label_agreement":null},{"id":"W3161460082","doi":"10.1109/tpwrs.2021.3079395","title":"Dynamic State Estimation for Power System Control and Protection","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Engineering and Physical Sciences Research Council; U.S. Department of Energy","keywords":"Electric power system; Resilience (materials science); State (computer science); Reliability engineering; Stability (learning theory); Control engineering; Engineering; Dynamic demand; Control (management); Estimation; Power-system protection; Computer science; Power (physics); Control theory (sociology); Systems engineering","score_opus":0.006325218055300274,"score_gpt":0.20259648392841145,"score_spread":0.19627126587311117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3161460082","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055588502,0.00030439155,0.9873264,0.000044181852,0.0038492023,0.0013997295,0.00028736447,0.0006509608,0.0005789158],"genre_scores_gemma":[0.99827063,0.000008769613,0.00060209655,0.000011875985,0.0000016942154,0.0005995769,0.000006068868,0.000051733547,0.0004475579],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866027,0.000111700276,0.00047148956,0.0003145292,0.0001934668,0.00024852884],"domain_scores_gemma":[0.99922913,0.00007938459,0.00006411786,0.00032124954,0.00019360606,0.00011250661],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028823994,0.00022296942,0.00032808125,0.00012977727,0.00017429118,0.00014102916,0.000057982255,0.00012994169,0.0000156575],"category_scores_gemma":[0.000008147933,0.00023017805,0.000100472076,0.0002104003,0.000022747112,0.00020972325,4.557161e-7,0.00014368776,0.00002449232],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006056432,0.0000572173,0.0000035448604,0.0008543513,0.00015092285,0.0000047828876,0.0005408061,0.9951454,0.002653084,0.00013353696,0.00006659415,0.0003292169],"study_design_scores_gemma":[0.0010894894,0.00009264953,0.00006452335,0.00017245478,0.0000376467,0.00008924032,0.00046535762,0.99538964,0.0011490124,0.0000061568617,0.0011993087,0.00024452448],"about_ca_topic_score_codex":0.000015802147,"about_ca_topic_score_gemma":0.000029809858,"teacher_disagreement_score":0.9927118,"about_ca_system_score_codex":0.00028780435,"about_ca_system_score_gemma":0.000039168786,"threshold_uncertainty_score":0.93863887},"labels":[],"label_agreement":null},{"id":"W3162671986","doi":"10.1109/tpwrs.2021.3081557","title":"Sample Robust Scheduling of Electricity-Gas Systems Under Wind Power Uncertainty","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"National Key Research and Development Program of China Stem Cell and Translational Research; State Grid Corporation of China","keywords":"Wind power; Electricity; Power to gas; Environmental science; Scheduling (production processes); Sample (material); Computer science; Engineering; Operations management; Electrical engineering; Physics","score_opus":0.013259328146863168,"score_gpt":0.20885966650124116,"score_spread":0.19560033835437798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3162671986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021564823,0.002228147,0.9659084,0.000030389374,0.006562947,0.00062821526,0.00013510023,0.0005416807,0.0024003119],"genre_scores_gemma":[0.99842054,0.00012191445,0.00066632096,0.000020806037,0.000035464305,0.00006671196,0.000019699384,0.00013606482,0.00051245943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968399,0.00025630728,0.0010526452,0.00052437314,0.00067156006,0.0006552217],"domain_scores_gemma":[0.9979429,0.0004144734,0.00019071891,0.00079719414,0.00045893653,0.00019573714],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00044431508,0.0004547177,0.0007488517,0.0004776938,0.00017970453,0.0001635889,0.00027768945,0.00036653236,0.000110463014],"category_scores_gemma":[0.000027661394,0.0004911543,0.0002402549,0.0015992536,0.000039800412,0.00028954018,0.0000020669318,0.00051638705,0.00006361906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020225218,0.0001274876,0.000018298226,0.00026893558,0.0003562221,0.000013053345,0.00030309331,0.9920565,0.0058745085,0.0006422707,0.00027622655,0.000043205426],"study_design_scores_gemma":[0.0011930334,0.00024633118,0.000029297553,0.0007104111,0.00016422318,0.0002534458,0.0013780232,0.969574,0.023585508,0.000018234216,0.0019661146,0.0008814048],"about_ca_topic_score_codex":0.00039813243,"about_ca_topic_score_gemma":0.000035515717,"teacher_disagreement_score":0.97685575,"about_ca_system_score_codex":0.00057943095,"about_ca_system_score_gemma":0.00019730169,"threshold_uncertainty_score":0.999754},"labels":[],"label_agreement":null},{"id":"W3165970158","doi":"10.1109/tpwrs.2021.3086075","title":"Regulation Signal Design and Fast Frequency Control With Energy Storage Systems","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Independent Electricity System Operator; Mohawk College; University of Toronto; University of Waterloo","funders":"","keywords":"Filter (signal processing); SIGNAL (programming language); Notation; Process (computing); Signal processing; Computer science; Control theory (sociology); Mathematics; Control (management); Engineering; Electrical engineering; Computer hardware; Arithmetic; Digital signal processing; Artificial intelligence; Programming language","score_opus":0.004755726152945833,"score_gpt":0.15705596881110848,"score_spread":0.15230024265816264,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165970158","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006074414,0.0032729607,0.99390036,0.000018488707,0.0011597708,0.00030147177,0.00004119453,0.00026386775,0.00043442985],"genre_scores_gemma":[0.9986347,0.000102826176,0.0005421759,0.000017133945,0.000028565139,0.00013420588,0.0000069902594,0.0000494642,0.0004839189],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890673,0.00014330879,0.00028596347,0.00024656314,0.00020024064,0.00021716478],"domain_scores_gemma":[0.99942034,0.00007606708,0.00005026744,0.00022241275,0.00013296763,0.00009791565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011958132,0.00021148461,0.00027416274,0.00011715269,0.000121704565,0.00015792908,0.00005547055,0.00012464401,0.00004959002],"category_scores_gemma":[7.385109e-7,0.00019431328,0.000044198394,0.00020823527,0.000023398137,0.00020556347,2.5658906e-7,0.00012322872,0.000009332453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035684436,0.000027283808,0.0000038280277,0.000054927783,0.00014552473,0.000021472979,0.00011988385,0.9855294,0.013299289,0.00014027335,0.00011928693,0.0005031095],"study_design_scores_gemma":[0.0011792486,0.00012302802,0.000024816045,0.00014238368,0.0000777105,0.00015498228,0.00011955156,0.99458814,0.0025394966,0.000004483421,0.00078583823,0.00026034843],"about_ca_topic_score_codex":0.00007542203,"about_ca_topic_score_gemma":0.00002035275,"teacher_disagreement_score":0.99802727,"about_ca_system_score_codex":0.000094296316,"about_ca_system_score_gemma":0.000040088045,"threshold_uncertainty_score":0.7923866},"labels":[],"label_agreement":null},{"id":"W3170969450","doi":"10.1109/tpwrs.2021.3088376","title":"Real-Time Resilience Optimization Combining an AI Agent With Online Hard Optimization","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Control reconfiguration; Resilience (materials science); Convergence (economics); Computer science; Interdependence; Fault (geology); Electric power system; Distributed computing; Node (physics); Optimization problem; Multi-agent system; Electricity; Reliability engineering; Mathematical optimization; Engineering; Power (physics); Artificial intelligence; Algorithm; Embedded system","score_opus":0.007875328487512812,"score_gpt":0.22536565029854794,"score_spread":0.21749032181103511,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3170969450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023599861,0.00003590313,0.97452307,0.0000501474,0.0005855339,0.00019406599,0.000052334744,0.00035709434,0.00060201634],"genre_scores_gemma":[0.9845054,0.00010976634,0.014746953,0.000041611765,0.000020926012,0.00003196308,0.00007838165,0.000048843216,0.00041615719],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984171,0.00013725957,0.00038858742,0.00038381337,0.0003940902,0.00027916188],"domain_scores_gemma":[0.99899375,0.000044820594,0.00005631404,0.000528491,0.00023745053,0.0001391502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001663175,0.00023581157,0.00030917354,0.00018176429,0.00022894253,0.00017087677,0.00015541233,0.00013887441,0.00035521568],"category_scores_gemma":[0.0000048159054,0.00022188199,0.00008240938,0.00071037735,0.000051151976,0.0005123652,9.3107036e-7,0.00026303515,0.000020009977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022957456,0.00010655532,0.000016458303,0.00004330084,0.00008026232,0.000014226022,0.0002963363,0.99634254,0.0028675434,0.000011044871,0.000059820133,0.00013895218],"study_design_scores_gemma":[0.0002982296,0.00013501318,0.000037695958,0.00010766389,0.00008037281,0.000041523515,0.0005899193,0.9932181,0.0051697493,0.0000013126984,0.000057704547,0.00026268113],"about_ca_topic_score_codex":0.000067631176,"about_ca_topic_score_gemma":0.00004443735,"teacher_disagreement_score":0.96090555,"about_ca_system_score_codex":0.00016587811,"about_ca_system_score_gemma":0.000077225355,"threshold_uncertainty_score":0.90480846},"labels":[],"label_agreement":null},{"id":"W3171190683","doi":"10.1109/tpwrs.2021.3086844","title":"Frequency Stability Constrained Microgrid Scheduling Considering Seamless Islanding","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":76,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Islanding; Microgrid; Automatic frequency control; Control theory (sociology); Scheduling (production processes); Overshoot (microwave communication); Integer programming; Electric power system; Mathematical optimization; Computer science; Frequency deviation; Frequency response; Linear programming; Engineering; Distributed generation; Renewable energy; Power (physics); Mathematics; Telecommunications; Electrical engineering","score_opus":0.01266337968457424,"score_gpt":0.20035747788164784,"score_spread":0.1876940981970736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3171190683","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.073490106,0.002610418,0.9176675,0.00004311763,0.0038310173,0.0002833361,0.00011934647,0.00056135847,0.0013937678],"genre_scores_gemma":[0.9974562,0.00018945646,0.0021425313,0.000029242246,0.000032169646,0.00005125613,0.000009512045,0.000048955702,0.000040662017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986041,0.000081614526,0.00045591328,0.00032196226,0.00017725884,0.0003591383],"domain_scores_gemma":[0.9992346,0.00010918192,0.00004511981,0.000349876,0.00014250082,0.00011872265],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001946474,0.00024768576,0.0003307886,0.000112374066,0.0001792192,0.00016554596,0.0000949395,0.00014811906,0.00028089702],"category_scores_gemma":[0.000007602504,0.00027165073,0.00014061682,0.00028335492,0.000046293528,0.00019165546,9.642856e-7,0.00031452082,0.000050613333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001066746,0.000079824276,0.00012736446,0.00025040354,0.000235886,0.0000592934,0.0007490836,0.80953676,0.18786415,0.00008602679,0.000043134503,0.0009574206],"study_design_scores_gemma":[0.0025951664,0.000075661,0.00004620963,0.00065833866,0.00017020086,0.0004989343,0.0033108974,0.60913575,0.38041934,0.00004839204,0.0017970724,0.00124405],"about_ca_topic_score_codex":0.000030819465,"about_ca_topic_score_gemma":0.00005341255,"teacher_disagreement_score":0.9239661,"about_ca_system_score_codex":0.00017468802,"about_ca_system_score_gemma":0.00007868675,"threshold_uncertainty_score":0.9999736},"labels":[],"label_agreement":null},{"id":"W3172149718","doi":"10.1109/tpwrs.2021.3086085","title":"A New Global Solver for Transmission Expansion Planning With AC Network Model","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Solver; Relaxation (psychology); Mathematical optimization; Bounding overwatch; Computer science; Lagrangian relaxation; Scalability; Upper and lower bounds; Integer programming; Global optimization; Transmission (telecommunications); Branch and bound; Optimization problem; Integer (computer science); Nonlinear programming; Nonlinear system; Mathematics; Telecommunications","score_opus":0.013595955570876127,"score_gpt":0.23286222235324058,"score_spread":0.21926626678236447,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3172149718","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041403337,0.0007420878,0.9912063,0.000048694492,0.0018123739,0.0004519503,0.0001903769,0.0004845992,0.00092329044],"genre_scores_gemma":[0.98775315,0.00001711583,0.011434251,0.000028342214,0.000049303962,0.00008625646,0.00003613593,0.00005970043,0.0005357629],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859715,0.000024726785,0.0003118236,0.00033897886,0.0002782284,0.00044906815],"domain_scores_gemma":[0.9993155,0.000038273272,0.00003335977,0.0003028794,0.00009546964,0.00021451736],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009412366,0.00028250235,0.00029193706,0.00003882376,0.0001701165,0.000092528426,0.0001090152,0.0001930157,0.000031897125],"category_scores_gemma":[0.0000010041306,0.00026873953,0.00014503594,0.00033779925,0.00001282845,0.00023746293,6.074379e-7,0.00019793889,0.000019683881],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014695468,0.000042621938,0.00000497075,0.00008891116,0.00009323609,0.000012685402,0.00017834698,0.9882513,0.001993289,0.00008459882,0.008096923,0.0010061405],"study_design_scores_gemma":[0.0013179947,0.00023013384,0.000018115297,0.0005868013,0.000105820676,0.00007205548,0.00015740105,0.9824668,0.005957533,0.00004932876,0.008599897,0.00043809315],"about_ca_topic_score_codex":0.000016317761,"about_ca_topic_score_gemma":0.000011369841,"teacher_disagreement_score":0.9836128,"about_ca_system_score_codex":0.0002395411,"about_ca_system_score_gemma":0.00013829333,"threshold_uncertainty_score":0.99997646},"labels":[],"label_agreement":null},{"id":"W3191335747","doi":"10.1109/tpwrs.2021.3100782","title":"An Incentive Compatible Iterative Mechanism for Coupling Electricity Markets","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Science Foundation of Sri Lanka","keywords":"Market clearing; Electricity market; Incentive; Incentive compatibility; Electricity; Microeconomics; Nash equilibrium; Marginal cost; Clearing; Economics; Market mechanism; Market power; Computer science; Mathematical optimization; Monopoly; Engineering; Market economy; Finance","score_opus":0.009862835102707905,"score_gpt":0.227486651815169,"score_spread":0.2176238167124611,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191335747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012886282,0.0002632699,0.9809083,0.000012280226,0.0035167604,0.0008465588,0.00012745206,0.0005369626,0.00090218405],"genre_scores_gemma":[0.99782795,0.00005012693,0.0012363228,0.000030800937,0.000026308133,0.00032993066,0.000028063,0.00008304965,0.00038747632],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837565,0.00009619709,0.00045485335,0.00038876143,0.0002745259,0.00041003712],"domain_scores_gemma":[0.99879396,0.00017265895,0.00007738842,0.0003812426,0.00044451558,0.00013023701],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023785197,0.00028033927,0.00037371254,0.00022708728,0.00021751935,0.00015206223,0.00015160113,0.00017107921,0.000038836028],"category_scores_gemma":[0.0000074009104,0.0003145372,0.00011735894,0.00064143405,0.000011632395,0.0003616204,5.327411e-7,0.00023450928,0.000024534522],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006777285,0.00024983933,0.0000077449295,0.00021135111,0.0003190396,0.000015143962,0.0009437085,0.96220654,0.03340288,0.0019045813,0.0004830374,0.00018833313],"study_design_scores_gemma":[0.0005678163,0.00016285134,0.000010962178,0.000110684145,0.000044057313,0.000024762834,0.00020877352,0.8258013,0.172537,0.000033516517,0.00019479683,0.0003034926],"about_ca_topic_score_codex":0.0000201006,"about_ca_topic_score_gemma":0.000023514714,"teacher_disagreement_score":0.98494166,"about_ca_system_score_codex":0.00036443677,"about_ca_system_score_gemma":0.00007414501,"threshold_uncertainty_score":0.9999307},"labels":[],"label_agreement":null},{"id":"W3195153849","doi":"10.1109/tpwrs.2021.3104768","title":"Energy-Storage Modeling: State-of-the-Art and Future Research Directions","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":125,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Energy storage; Computer science; Electric power system; Energy modeling; Energy balance; Fidelity; Rendering (computer graphics); Reliability engineering; Efficient energy use; Systems engineering; Engineering; Power (physics); Artificial intelligence","score_opus":0.012998832783047864,"score_gpt":0.22227395257291072,"score_spread":0.20927511978986285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195153849","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030991102,0.0071136905,0.98350286,0.00015171518,0.0038595598,0.0001414209,0.000052073803,0.0001244086,0.0019551814],"genre_scores_gemma":[0.99537057,0.00234382,0.00008324007,0.000009528862,0.000037762653,0.000047342335,0.0000020604152,0.000027891305,0.0020777874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914473,0.00010003214,0.00020997862,0.00015829125,0.0002102939,0.00017669647],"domain_scores_gemma":[0.99944013,0.000036939386,0.000015972173,0.0002740785,0.00017522517,0.000057637768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013947069,0.000102676466,0.00014256588,0.00011785736,0.0001761633,0.000052303305,0.00007325049,0.00007339124,0.000029143848],"category_scores_gemma":[0.0000012979197,0.00008898348,0.00006804847,0.00043001812,0.000025367432,0.00008664861,0.0000011200896,0.00022731276,0.000007270558],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008368645,0.00004001268,0.0000013102808,0.00004738232,0.00006672957,0.0000027673216,0.00033046067,0.9911559,0.0031846485,0.000061730614,0.0006834221,0.0044172374],"study_design_scores_gemma":[0.00026324624,0.000023968914,0.0000071475847,0.00006351567,0.0000200162,0.000030145042,0.00023033064,0.8947291,0.005898237,0.000020663017,0.09858371,0.00012994134],"about_ca_topic_score_codex":0.000045482328,"about_ca_topic_score_gemma":0.00011675744,"teacher_disagreement_score":0.9922715,"about_ca_system_score_codex":0.000056222678,"about_ca_system_score_gemma":0.000035480924,"threshold_uncertainty_score":0.36286408},"labels":[],"label_agreement":null},{"id":"W3195795842","doi":"10.1109/tpwrs.2021.3096953","title":"A Linearized AC Planning Model for Generations and SFCLs Incorporating Transient Stability and Short-Circuit Constraints","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Transient (computer programming); Resistive touchscreen; Control theory (sociology); Linearization; Bilinear interpolation; Nonlinear system; Computer science; Stability (learning theory); Limit (mathematics); Mathematical optimization; Mathematics; Physics","score_opus":0.048914649035456004,"score_gpt":0.25249799236860526,"score_spread":0.20358334333314926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3195795842","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111244574,0.00035843917,0.8861145,0.00001853581,0.000820381,0.00075851753,0.00022723827,0.00018669035,0.0002711444],"genre_scores_gemma":[0.9980614,0.000012721761,0.0013824649,0.000011396177,0.00002599016,0.00038573623,0.0000087501485,0.000037165562,0.000074350966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880946,0.00005980404,0.00045013658,0.00032551846,0.00014362173,0.00021146453],"domain_scores_gemma":[0.99944365,0.000085436186,0.00003438828,0.00019961735,0.00011444583,0.00012243721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031553337,0.00019926872,0.00029952978,0.00008593376,0.00027816393,0.00014711816,0.00003606465,0.00016198288,0.000008026509],"category_scores_gemma":[0.000007172383,0.00021012902,0.00007021213,0.00013406783,0.000057049238,0.00017236499,6.5930453e-7,0.00020519555,0.0000011009887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002420333,0.0000716047,0.000035132398,0.00049632444,0.00017554469,0.0000069529788,0.00442037,0.8175855,0.17496261,0.00019837524,0.000037259426,0.0019861115],"study_design_scores_gemma":[0.0005635696,0.000054561322,0.000019134159,0.00013737513,0.000043542284,0.00008319914,0.00094695546,0.98410016,0.013634585,0.000021604903,0.00016284143,0.00023244061],"about_ca_topic_score_codex":0.000018341112,"about_ca_topic_score_gemma":0.00005682141,"teacher_disagreement_score":0.88681686,"about_ca_system_score_codex":0.00007186441,"about_ca_system_score_gemma":0.000055199507,"threshold_uncertainty_score":0.85688126},"labels":[],"label_agreement":null},{"id":"W4205210610","doi":"10.1109/tpwrs.2021.3134818","title":"Estimation of Inertia for Synchronous and Non-Synchronous Generators Based on Ambient Measurements","year":2021,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Inertia; Permanent magnet synchronous generator; Electric power system; Synchronous motor; Computer science; Automatic Generation Control; Control theory (sociology); Control engineering; Engineering; Power (physics); Electrical engineering; Physics; Voltage","score_opus":0.012137862838028743,"score_gpt":0.2217341845055469,"score_spread":0.20959632166751818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205210610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07262013,0.00018925006,0.92376816,0.000017492932,0.0019261969,0.0006774729,0.000054390686,0.000114181785,0.00063272094],"genre_scores_gemma":[0.9993138,0.000004530922,0.00029661504,0.00002549536,0.000019255374,0.0002136843,0.00001044463,0.000044501037,0.00007170582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998755,0.00005866895,0.00046285338,0.0002387072,0.0002890753,0.000195699],"domain_scores_gemma":[0.9993111,0.00008091173,0.00007320292,0.00030587194,0.00013388968,0.000095063406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018744588,0.0002029904,0.00032730482,0.00016021945,0.000090806745,0.0000665363,0.000059500366,0.0001105763,0.00002418344],"category_scores_gemma":[0.000005633703,0.00020421081,0.00010984236,0.00016740189,0.000016501886,0.00009869044,3.624384e-7,0.00008276596,0.000014914642],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003406342,0.00009669309,0.000021270462,0.00024528024,0.00010155589,0.0000015285199,0.00012322143,0.979393,0.017593425,0.000007488197,0.00012365682,0.0022588007],"study_design_scores_gemma":[0.001403697,0.00018342868,0.00013426121,0.00019228912,0.00004477689,0.0000050351455,0.00006297915,0.94173914,0.05583934,0.0000012111967,0.00021085984,0.00018296526],"about_ca_topic_score_codex":0.000041818756,"about_ca_topic_score_gemma":0.000018581557,"teacher_disagreement_score":0.9266936,"about_ca_system_score_codex":0.00015933528,"about_ca_system_score_gemma":0.000056856683,"threshold_uncertainty_score":0.8327475},"labels":[],"label_agreement":null},{"id":"W4205628987","doi":"10.1109/tpwrs.2022.3142110","title":"A Data-Driven Method for Prediction of Post-Fault Voltage Stability in Hybrid AC/DC Microgrids","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Microgrid; Benchmark (surveying); Control theory (sociology); Fault (geology); Transient (computer programming); Voltage; Computer science; Probabilistic logic; Distributed generation; Engineering; Control (management); Artificial intelligence; Renewable energy; Electrical engineering","score_opus":0.01831880299885775,"score_gpt":0.239184707234047,"score_spread":0.22086590423518926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4205628987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013183623,0.0004339938,0.9652226,0.000028127813,0.002413975,0.0011055113,0.017365722,0.00018895812,0.000057485642],"genre_scores_gemma":[0.9969786,0.000033049295,0.0020743848,0.000016616044,0.0000187135,0.0004794616,0.00030566924,0.00004356998,0.00004993619],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853176,0.00012864785,0.00055618794,0.00033579746,0.0002123212,0.00023531281],"domain_scores_gemma":[0.9990506,0.00013314618,0.0000767738,0.0005951475,0.00009279374,0.00005149928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061870995,0.00017315363,0.00031977074,0.00023285543,0.000113220034,0.000026421338,0.00030228304,0.000058208905,0.000103215665],"category_scores_gemma":[0.0000068761306,0.00019119956,0.00010621147,0.0002697781,0.000017374812,0.00021499801,0.000004281605,0.0002558354,0.0000028293427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012924368,0.00019440956,0.00002238145,0.00017420058,0.0001009865,0.0000018389596,0.00043800988,0.9546749,0.042125713,0.000004954818,0.0005224503,0.001610934],"study_design_scores_gemma":[0.0011519599,0.00023521,0.000070589085,0.000027453243,0.00006147807,0.000022439488,0.00053297664,0.97957605,0.00785684,0.000003337169,0.010298917,0.00016273833],"about_ca_topic_score_codex":0.00017846121,"about_ca_topic_score_gemma":0.00009043167,"teacher_disagreement_score":0.983795,"about_ca_system_score_codex":0.00020998796,"about_ca_system_score_gemma":0.000044312263,"threshold_uncertainty_score":0.7796892},"labels":[],"label_agreement":null},{"id":"W4210864430","doi":"10.1109/tpwrs.2022.3148983","title":"Dynamic Analysis and Active Stabilization of a Utility-Scale Grid-Connected Current-Source Inverter-Based PV System Considering Source Dynamics","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Photovoltaic System Optimization Techniques","field":"Energy","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Control theory (sociology); Photovoltaic system; Maximum power point tracking; Grid; Inductance; Voltage source; Operating point; Engineering; Computer science; Inverter; Voltage; Electronic engineering; Electrical engineering; Mathematics","score_opus":0.009232026176090742,"score_gpt":0.22500915698695986,"score_spread":0.21577713081086913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210864430","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14730309,0.00009324656,0.8491031,0.000015637157,0.0009903401,0.00091137714,0.00065394596,0.0007134564,0.00021581339],"genre_scores_gemma":[0.99870473,0.00000794909,0.00030301476,0.000016516306,0.000004839261,0.0006061607,0.00012775137,0.000082965234,0.00014605428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962769,0.00096715894,0.0010309331,0.0006958624,0.0006826556,0.0003464564],"domain_scores_gemma":[0.99778545,0.0003553027,0.0006112269,0.0007932434,0.00030378895,0.00015096104],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00053290755,0.0003905804,0.0008599072,0.0012510581,0.00047455612,0.00007237416,0.00027153984,0.00015165412,0.00011968038],"category_scores_gemma":[0.000016589842,0.0004388152,0.00030337824,0.0021439136,0.00012506728,0.00019133094,0.000009931883,0.0003770845,0.0000033968192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022303399,0.00037529675,0.00084553275,0.0005689976,0.0007541742,0.000003003089,0.001986572,0.9904338,0.0031413124,0.00007809089,0.000019586652,0.0015705775],"study_design_scores_gemma":[0.0007446875,0.00016960308,0.000111890826,0.00016047539,0.00052872644,0.000029408337,0.0067125694,0.97667384,0.013844787,0.0000033659696,0.0006472309,0.0003734147],"about_ca_topic_score_codex":0.0036345054,"about_ca_topic_score_gemma":0.0019005622,"teacher_disagreement_score":0.8514017,"about_ca_system_score_codex":0.0010649798,"about_ca_system_score_gemma":0.0001298198,"threshold_uncertainty_score":0.99980634},"labels":[],"label_agreement":null},{"id":"W4214491867","doi":"10.1109/tpwrs.2022.3153450","title":"Hybrid Parallel-in-Time-and-Space Transient Stability Simulation of Large-Scale AC/DC Grids","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Scalability; Parallel computing; Transient (computer programming); Speedup; Grid; Asynchronous communication; Computational science","score_opus":0.009805316317533721,"score_gpt":0.22118823621576741,"score_spread":0.21138291989823368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214491867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4312385,0.0001664504,0.5661165,0.000017363047,0.0012262312,0.0006562038,0.00020241128,0.00014746246,0.00022886136],"genre_scores_gemma":[0.99944234,0.000010399445,0.000044362594,0.0000049339674,0.000011318489,0.00026188415,0.000005286784,0.000038385726,0.00018111171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983299,0.000191572,0.0005329245,0.00028412862,0.00039390294,0.00026761956],"domain_scores_gemma":[0.99942577,0.00007903126,0.0000627322,0.00031614356,0.000039408886,0.00007689956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006390782,0.00019237667,0.000349867,0.00020834114,0.00016039684,0.000025360638,0.0001106088,0.00007193375,0.00016594068],"category_scores_gemma":[0.0000018046869,0.00020898934,0.00011333383,0.0002759266,0.000022135495,0.00014303616,0.0000015994169,0.00033351826,0.000013476172],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006546282,0.00016112972,0.000044206226,0.00014745275,0.000036203397,0.000002789265,0.0019004828,0.99052405,0.0069544353,0.000005997616,0.000039284692,0.0001184774],"study_design_scores_gemma":[0.0012328383,0.00029372127,0.00041682305,0.000078751,0.000028288923,0.000031064767,0.0011095132,0.9815112,0.007226787,0.0000056671406,0.007739325,0.0003260161],"about_ca_topic_score_codex":0.00021090254,"about_ca_topic_score_gemma":0.000059253915,"teacher_disagreement_score":0.5682038,"about_ca_system_score_codex":0.00023701094,"about_ca_system_score_gemma":0.000017272178,"threshold_uncertainty_score":0.85223377},"labels":[],"label_agreement":null},{"id":"W4214722396","doi":"10.1109/tpwrs.2022.3153431","title":"A Conceptual Analysis of Equilibrium Bidding Strategy in a Combined Oligopoly and Oligopsony Wholesale Electricity Market","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Bidding; Oligopoly; Economics; Demand curve; Nash equilibrium; Pareto principle; Microeconomics; Mathematical economics; Partial equilibrium; Supply and demand; Game theory; Supply; Competition (biology); Computer science; General equilibrium theory; Cournot competition; Operations management","score_opus":0.010238596067931227,"score_gpt":0.20498869935868655,"score_spread":0.19475010329075532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214722396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8616316,0.00040085183,0.13098751,0.00001808617,0.0011376163,0.0003580886,0.00013872633,0.00021895183,0.005108621],"genre_scores_gemma":[0.9992814,0.000024177552,0.000009589296,0.0000147005685,0.0000055680716,0.00016567878,0.0000055382393,0.000034420977,0.000458927],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985172,0.00014722612,0.00045168702,0.00026495033,0.0003139366,0.0003049756],"domain_scores_gemma":[0.99944925,0.00010103544,0.0000615427,0.00029524663,0.000022381442,0.00007051862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003170545,0.00019522112,0.0004504089,0.0010701554,0.00006900904,0.000033253447,0.00016882202,0.000054486554,0.0002324104],"category_scores_gemma":[0.0000016430257,0.00023088323,0.000118039025,0.0019574144,0.000046404195,0.00010932683,0.000004377623,0.00025492517,0.0000018444206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004674602,0.00009629902,0.00026730186,0.000039954106,0.00074933,0.000011782809,0.0004774542,0.9949924,0.0025730785,0.0002611671,0.00043120605,0.000053289088],"study_design_scores_gemma":[0.000974235,0.00029757942,0.0030580165,0.000030261974,0.00035884354,0.000008074737,0.0019929784,0.9897904,0.0018969846,0.0000043811133,0.0012451623,0.00034308116],"about_ca_topic_score_codex":0.0004216083,"about_ca_topic_score_gemma":0.00013453717,"teacher_disagreement_score":0.13764985,"about_ca_system_score_codex":0.00023262388,"about_ca_system_score_gemma":0.000020083397,"threshold_uncertainty_score":0.9415145},"labels":[],"label_agreement":null},{"id":"W4214909550","doi":"10.1109/tpwrs.2022.3155692","title":"A Novel Control Technique for Enhancing the Operation of MTDC Grids","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University; University of Waterloo","funders":"Khalifa University of Science, Technology and Research","keywords":"Voltage droop; Control theory (sociology); Controller (irrigation); Voltage source; Converters; AC power; Electric power system; Automatic frequency control; Voltage; Voltage regulator; Voltage controller; Voltage regulation; Computer science; Engineering; Power (physics); Control (management); Electrical engineering; Physics","score_opus":0.008925525071069721,"score_gpt":0.21212998427296756,"score_spread":0.20320445920189784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4214909550","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011755744,0.000110546054,0.9927381,0.00003228355,0.0031428433,0.0021898726,0.00021462681,0.0001539421,0.00024219124],"genre_scores_gemma":[0.9943954,0.0000021732485,0.00013058857,0.000015078604,0.000029789535,0.0051687174,0.0000018765988,0.00003612477,0.00022028033],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990558,0.00006311534,0.00039486564,0.00013855475,0.00019566818,0.00015197026],"domain_scores_gemma":[0.9995359,0.00008671762,0.00006007157,0.00023696317,0.00005387474,0.000026469499],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006141077,0.00012231001,0.00019671659,0.000111843394,0.0003202009,0.00002794915,0.00012160584,0.000062824394,0.000028139386],"category_scores_gemma":[0.000002565601,0.000101745616,0.00011295672,0.00017706747,0.000013287013,0.00008191577,5.411638e-7,0.00021444498,0.000003560082],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021308613,0.000032066935,2.9364145e-7,0.00007325282,0.00004933725,1.581973e-7,0.00037188115,0.57562494,0.4235295,0.00009218921,0.00010975715,0.00009529884],"study_design_scores_gemma":[0.0023132486,0.0009551324,0.00001534261,0.0001759721,0.00009928041,0.00022189485,0.0029781864,0.46590576,0.49367687,0.000011257312,0.033146948,0.00050009403],"about_ca_topic_score_codex":0.00020658676,"about_ca_topic_score_gemma":0.00005577833,"teacher_disagreement_score":0.9932198,"about_ca_system_score_codex":0.00014884837,"about_ca_system_score_gemma":0.00002409186,"threshold_uncertainty_score":0.4149066},"labels":[],"label_agreement":null},{"id":"W4220796159","doi":"10.1109/tpwrs.2022.3148029","title":"Closure to Discussion on “Mitigation of Fault Induced Delayed Voltage Recovery (FIDVR) by PV-STATCOM”","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Islanding Detection in Power Systems","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Photovoltaic system; Transmission system; Fault (geology); Voltage; Electric power system; Transmission (telecommunications); Electrical engineering; Closure (psychology); Grid-connected photovoltaic power system; Engineering; Automotive engineering; Computer science; Reliability engineering; Maximum power point tracking; Power (physics); Physics; Geology","score_opus":0.007416384756701915,"score_gpt":0.21272447001805103,"score_spread":0.2053080852613491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220796159","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23206683,0.000065098364,0.741517,0.00008863833,0.021333635,0.0011415851,0.0012425752,0.00062541605,0.0019192519],"genre_scores_gemma":[0.99638104,0.000005404461,0.000020676105,0.000050245748,0.00003492547,0.00057202746,0.00002554337,0.00011751719,0.0027925975],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9973646,0.00022457502,0.0007996307,0.00042903653,0.0008038549,0.0003783239],"domain_scores_gemma":[0.9988698,0.000117074094,0.00015697815,0.00062292744,0.000076271426,0.0001569527],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045673727,0.00034997123,0.00044556407,0.0005814003,0.00035066984,0.00006569,0.0002890153,0.00017595611,0.00017475101],"category_scores_gemma":[0.000007525123,0.00031402885,0.00020561888,0.00080913573,0.000017860068,0.00018280576,0.0000035479106,0.00063344993,0.00013163262],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030618598,0.00023022304,0.00002883657,0.0001651282,0.00028934036,0.00000952054,0.002806871,0.81834996,0.14103185,0.00004105245,0.036098044,0.0006430019],"study_design_scores_gemma":[0.007147764,0.013398292,0.00029365617,0.0017524711,0.00037218342,0.0003408741,0.014390973,0.075248644,0.6104074,0.00008139473,0.27199665,0.004569705],"about_ca_topic_score_codex":0.00014833317,"about_ca_topic_score_gemma":0.000023842142,"teacher_disagreement_score":0.76431423,"about_ca_system_score_codex":0.0006367412,"about_ca_system_score_gemma":0.000032358297,"threshold_uncertainty_score":0.99993116},"labels":[],"label_agreement":null},{"id":"W4224237392","doi":"10.1109/tpwrs.2022.3161418","title":"Real-World Subsynchronous Oscillation Events in Power Grids With High Penetrations of Inverter-Based Resources","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":430,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Stantec (Canada); Hydro One (Canada)","funders":"U.S. Department of Energy","keywords":"Electric power system; Inverter; Grid; Oscillation (cell signaling); Engineering; Compensation (psychology); Power grid; Reliability engineering; Power (physics); Computer science; Electrical engineering; Voltage; Physics; Geography","score_opus":0.0054711845052850365,"score_gpt":0.1832562145377157,"score_spread":0.17778503003243068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224237392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61696094,0.00016462896,0.37913597,0.0000462233,0.0014857167,0.0006938908,0.00015699051,0.00022506555,0.0011305647],"genre_scores_gemma":[0.99943626,0.00001639481,0.000113287104,0.000014510463,0.000007826992,0.00020127349,0.000019777604,0.000040340503,0.0001503331],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987836,0.000112117086,0.00039800777,0.0002008819,0.00031067934,0.00019474032],"domain_scores_gemma":[0.9995021,0.000053238426,0.00007987793,0.0002665511,0.000048651924,0.00004956259],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016346358,0.00016884661,0.00023741672,0.0005284841,0.00013677031,0.000017848923,0.00012382462,0.000048667098,0.00022857719],"category_scores_gemma":[5.900246e-7,0.00017033673,0.00005972706,0.0007145307,0.000021814893,0.00012273647,7.995772e-7,0.00021202803,0.0000064165492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007781853,0.00011144245,0.0007790674,0.000034800487,0.000042425425,0.0000025623456,0.0005110802,0.9972063,0.0010919371,0.00002061453,0.000069001275,0.000052992655],"study_design_scores_gemma":[0.004052935,0.001044131,0.019916626,0.0002255807,0.00009947319,0.000018796047,0.0010864364,0.96768045,0.00320661,0.000011525613,0.0019163864,0.0007410232],"about_ca_topic_score_codex":0.0011496011,"about_ca_topic_score_gemma":0.0013895239,"teacher_disagreement_score":0.3824753,"about_ca_system_score_codex":0.00027704812,"about_ca_system_score_gemma":0.000049196264,"threshold_uncertainty_score":0.69461304},"labels":[],"label_agreement":null},{"id":"W4224301838","doi":"10.1109/tpwrs.2022.3154245","title":"Erratum to “Theoretical Parameter Design Method of SFCL for Concurrent Commutation Failure Inhibition in SFCL-Segmented Multi-Infeed LCC-HVDC Systems” [May 20 1741-1757]","year":2022,"lang":"en","type":"erratum","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"National Natural Science Foundation of China","keywords":"Commutation; Control theory (sociology); Computer science; Engineering; Electrical engineering; Voltage; Control (management); Artificial intelligence","score_opus":0.026520388967130697,"score_gpt":0.28567227274395746,"score_spread":0.25915188377682674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224301838","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009099221,0.000606005,0.9210701,0.00006916103,0.06815361,0.007555289,0.0016134599,0.00043594776,0.000405415],"genre_scores_gemma":[0.97673154,0.00005077605,0.004850319,0.00003317398,0.00023556133,0.011025828,0.00057109783,0.0004157346,0.006085993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9938267,0.0014270892,0.002227799,0.00092624483,0.0008084469,0.00078370696],"domain_scores_gemma":[0.9973609,0.0006520824,0.000504737,0.00083955715,0.00036853753,0.00027418378],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001999672,0.0009591248,0.0017185532,0.0014275406,0.00027036003,0.00020554644,0.00032193126,0.001231038,0.000112563466],"category_scores_gemma":[0.000058184643,0.0010113087,0.00050784735,0.0010137254,0.00008542246,0.00026556384,0.000006880972,0.0019278644,0.00004029951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002840112,0.00057729485,0.0000012034467,0.0039761984,0.0006691272,0.000022314905,0.0024418577,0.82659304,0.0075716316,0.0005338749,0.15681452,0.000514956],"study_design_scores_gemma":[0.004896138,0.0020620404,0.000007637698,0.005640313,0.0005041817,0.00021991304,0.0032868949,0.8518067,0.0075363717,0.000042091327,0.1218341,0.0021636272],"about_ca_topic_score_codex":0.0005707125,"about_ca_topic_score_gemma":0.00023194333,"teacher_disagreement_score":0.9766405,"about_ca_system_score_codex":0.0013050219,"about_ca_system_score_gemma":0.0001725833,"threshold_uncertainty_score":0.9992337},"labels":[],"label_agreement":null},{"id":"W4225786522","doi":"10.1109/tpwrs.2022.3161561","title":"Faster-Than-Real-Time Hardware Emulation of Extensive Contingencies for Dynamic Security Analysis of Large-Scale Integrated AC/DC Grid","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"HVDC Systems and Fault Protection","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Emulation; Field-programmable gate array; Transient (computer programming); Grid; Computer science; Hardware emulation; Embedded system; Electric power system; Computer hardware; Power (physics); Operating system","score_opus":0.007290299300372163,"score_gpt":0.23088689161986767,"score_spread":0.2235965923194955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225786522","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40562525,0.000082065104,0.58930403,0.0000044516114,0.0015606956,0.00073372666,0.002432672,0.00014409333,0.000113032154],"genre_scores_gemma":[0.99905664,0.000009318803,0.00008421019,0.0000022046233,0.000010858761,0.00037530527,0.00009870145,0.00004038266,0.00032238074],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983643,0.00013154659,0.00069984794,0.00025873157,0.000311856,0.00023366715],"domain_scores_gemma":[0.9989816,0.00009259482,0.00022516797,0.00033139967,0.000317883,0.000051338477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003974898,0.00020813479,0.00064249756,0.0006014849,0.00018078844,0.000021709788,0.00012819942,0.000111821886,0.00010679738],"category_scores_gemma":[0.000005351741,0.00021599855,0.00037616427,0.001002173,0.000023184833,0.00012996707,0.00000192026,0.00018958669,0.000004202808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000938158,0.00014605623,0.00006742944,0.00033513602,0.0013742266,0.0000011434571,0.0058315885,0.89579827,0.09607655,0.000009934465,0.00012460767,0.00014123914],"study_design_scores_gemma":[0.000605156,0.00028089652,0.0005108156,0.00009603448,0.000567653,0.0000070149017,0.0074963775,0.9786558,0.010267538,0.0000028871978,0.0012587683,0.0002510275],"about_ca_topic_score_codex":0.00056339253,"about_ca_topic_score_gemma":0.00035079813,"teacher_disagreement_score":0.59343135,"about_ca_system_score_codex":0.00021244286,"about_ca_system_score_gemma":0.000023545432,"threshold_uncertainty_score":0.8808165},"labels":[],"label_agreement":null},{"id":"W4226078321","doi":"10.1109/tpwrs.2022.3165210","title":"A Machine Learning-Based Framework for Fast Prediction of Wide-Area Remedial Control Actions in Interconnected Power Systems","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Transient (computer programming); Islanding; Electric power system; Control theory (sociology); Generator (circuit theory); Fault (geology); Computer science; Stability (learning theory); AC power; Microgrid; Transmission line; Engineering; Control engineering; Voltage; Power (physics); Control (management); Machine learning; Artificial intelligence","score_opus":0.015223903378846488,"score_gpt":0.21730507867995205,"score_spread":0.20208117530110556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226078321","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004737571,0.00023281598,0.97969997,0.000059885027,0.010460625,0.0019710106,0.0018483786,0.00057127175,0.0004184477],"genre_scores_gemma":[0.99771875,0.000006603491,0.00012491993,0.000022212334,0.0000065940276,0.0018110288,0.000056515546,0.000085652915,0.00016770848],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99721426,0.00046134135,0.0010596204,0.0004077311,0.00046714625,0.00038987424],"domain_scores_gemma":[0.99823856,0.00076131505,0.00020371786,0.00048008605,0.00018090427,0.00013540655],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007205909,0.00032760116,0.0006366629,0.0006168359,0.0002724025,0.000059974234,0.00023494133,0.00021796561,0.00027027493],"category_scores_gemma":[0.00007437124,0.00035887066,0.00025145776,0.0007300415,0.00004643309,0.00016679885,0.0000019216739,0.0007824067,0.0000068212653],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003192607,0.00027886542,0.00067830493,0.00019628025,0.00014237425,0.000002625223,0.0009715646,0.9966262,0.00043347722,0.00015642887,0.0001844498,0.000010145937],"study_design_scores_gemma":[0.0024439294,0.00064556644,0.0001701065,0.00023300046,0.000057224566,0.000018346313,0.0019739268,0.986549,0.00024382655,0.000006927976,0.0073606,0.00029753317],"about_ca_topic_score_codex":0.00017282895,"about_ca_topic_score_gemma":0.00011948456,"teacher_disagreement_score":0.9929812,"about_ca_system_score_codex":0.00061530905,"about_ca_system_score_gemma":0.00008706375,"threshold_uncertainty_score":0.99988633},"labels":[],"label_agreement":null},{"id":"W4226139753","doi":"10.1109/tpwrs.2022.3159392","title":"Three-Phase Second-Order Analytic Probabilistic Load Flow With Voltage-Dependent Load","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada; SaskPower","keywords":"Control theory (sociology); Voltage; Probabilistic logic; Quadratic equation; Probability density function; Constant (computer programming); AC power; Photovoltaic system; Electrical impedance; Mathematical optimization; Flow (mathematics); Mathematics; Applied mathematics; Computer science; Engineering; Statistics; Electrical engineering","score_opus":0.009361003240727715,"score_gpt":0.2157055930269263,"score_spread":0.20634458978619857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226139753","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026350984,0.00026778117,0.9649248,0.000026199588,0.003157115,0.0010417636,0.0012037394,0.00074660673,0.0022810192],"genre_scores_gemma":[0.9978745,0.0000030560368,0.00014382396,0.00002416222,0.000023035536,0.00060899573,0.000030159883,0.00010466276,0.0011876106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973526,0.000059792124,0.0005086103,0.0005157049,0.0010241813,0.0005391071],"domain_scores_gemma":[0.9987367,0.00006317855,0.00007493442,0.0007040249,0.00022529716,0.00019586396],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00038485305,0.00041179245,0.00041314674,0.00018170149,0.0003602216,0.00012860418,0.00030112863,0.0001041322,0.0017842854],"category_scores_gemma":[0.00000560991,0.00041270754,0.00013894963,0.00073314493,0.00005857131,0.00023857968,0.0000033474416,0.00069521094,0.00027344524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017386752,0.0004282716,0.0000072208127,0.0001602669,0.00027433512,0.00007652584,0.00031594772,0.99436116,0.0011815992,0.000031375763,0.0025553815,0.00043403034],"study_design_scores_gemma":[0.003192006,0.0013682472,0.00003115736,0.00008477919,0.0001923572,0.0002875477,0.0005127624,0.9786543,0.0011543015,0.000019763691,0.013640641,0.0008621327],"about_ca_topic_score_codex":0.00014690588,"about_ca_topic_score_gemma":0.00065064855,"teacher_disagreement_score":0.9715235,"about_ca_system_score_codex":0.0020778186,"about_ca_system_score_gemma":0.00025806238,"threshold_uncertainty_score":0.99983245},"labels":[],"label_agreement":null},{"id":"W4241439919","doi":"10.1109/tpwrs.2001.962477","title":"Discussion of \"Artificial neural network approach to single-ended fault locator for transmission lines","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems Fault Detection","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Artificial neural network; Electric power transmission; Computer science; Fault (geology); Electric power system; Power transmission; Artificial intelligence; Transmission (telecommunications); Transmission network; Engineering; Power (physics); Telecommunications; Electrical engineering","score_opus":0.022580952674217798,"score_gpt":0.23981297376847924,"score_spread":0.21723202109426143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241439919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022220988,0.00017168069,0.9667678,0.000055820736,0.007967461,0.0015208289,0.00005838053,0.0005570289,0.0006800355],"genre_scores_gemma":[0.9977032,0.0000063728735,0.00097130035,0.000012805995,0.000186207,0.00040476458,0.000008318584,0.00010711645,0.0005999166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977443,0.000094662195,0.00083641685,0.0004216479,0.00038468695,0.0005182539],"domain_scores_gemma":[0.99902356,0.00007524001,0.00009454378,0.00044703338,0.00012015824,0.00023949477],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002862757,0.00037065175,0.00052044366,0.00030630667,0.00018260053,0.00006667987,0.00022327033,0.00027397432,0.000008937808],"category_scores_gemma":[0.0000047812623,0.0002894378,0.00026201917,0.000713229,0.000028429466,0.00021073993,9.418751e-7,0.00022854118,0.000021611244],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033967703,0.00028334474,0.000005229949,0.00033392032,0.00009495662,0.0000015819209,0.0009282678,0.9197958,0.062055144,0.000017549579,0.0015548589,0.014589679],"study_design_scores_gemma":[0.0009792253,0.00080391706,0.000026348009,0.00052810006,0.00010801885,0.000105799634,0.0007949112,0.86788714,0.054592147,0.000013774416,0.07340182,0.0007588121],"about_ca_topic_score_codex":0.000041046966,"about_ca_topic_score_gemma":0.000024493094,"teacher_disagreement_score":0.9754822,"about_ca_system_score_codex":0.0001623222,"about_ca_system_score_gemma":0.000019871502,"threshold_uncertainty_score":0.9999558},"labels":[],"label_agreement":null},{"id":"W4245783092","doi":"10.1109/59.932289","title":"Inter-utilities power-exchange coordination: a market-oriented approach","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":70,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Electric power system; Scheduling (production processes); Computer science; Decomposition; Grid; Power system simulation; Independence (probability theory); Power market; Economic dispatch; Mathematical optimization; Market oriented; Power (physics); Economics; Mathematics","score_opus":0.009348881120758408,"score_gpt":0.19907350056024545,"score_spread":0.18972461943948704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245783092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001707934,0.0006127467,0.8906262,0.000041307514,0.0056352103,0.00077028497,0.000048680136,0.0011326072,0.099425055],"genre_scores_gemma":[0.98361784,0.00007400153,0.00027238342,0.000026568165,0.00003404645,0.00039999254,0.000011751321,0.00010781112,0.015455591],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978373,0.00016530513,0.00061340805,0.000418968,0.0004358132,0.00052921363],"domain_scores_gemma":[0.9988801,0.000098615565,0.00008628165,0.00059703994,0.00017174096,0.00016623827],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003753008,0.00040160678,0.0004177876,0.0005564159,0.00017638486,0.00012793712,0.00025267768,0.00024530906,0.0004667798],"category_scores_gemma":[0.000006970236,0.000422259,0.00015966622,0.0010094538,0.000044158813,0.00040776632,0.0000015510922,0.00034600738,0.00014528245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007877724,0.0024426763,0.0005136528,0.0028886646,0.0027634015,0.00020281057,0.021203501,0.76148665,0.0020837993,0.0024891195,0.1969244,0.0062135737],"study_design_scores_gemma":[0.0021797693,0.0005463229,0.00013614552,0.00046939027,0.00012007691,0.00068354624,0.0030590952,0.78951603,0.0012817142,0.000009187674,0.20057881,0.001419892],"about_ca_topic_score_codex":0.000062179206,"about_ca_topic_score_gemma":0.000011869381,"teacher_disagreement_score":0.98190993,"about_ca_system_score_codex":0.0004431702,"about_ca_system_score_gemma":0.00002973123,"threshold_uncertainty_score":0.9998229},"labels":[],"label_agreement":null},{"id":"W4247981495","doi":"10.1109/59.962402","title":"Bibliography on the application of probability methods in power system reliability evaluation 1996-1999","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":168,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Probabilistic logic; Reliability (semiconductor); Reliability engineering; Electric power system; Activity-based costing; Computer science; Bibliography; Power (physics); Engineering; Library science; Artificial intelligence","score_opus":0.022472755493910503,"score_gpt":0.28326492865065267,"score_spread":0.2607921731567422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247981495","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.073832214,0.0003830159,0.9101333,0.0001053201,0.0029377025,0.0034767936,0.000055680197,0.00037739507,0.008698553],"genre_scores_gemma":[0.9976056,0.00009976269,0.0005417358,0.000018041272,0.000010986789,0.0016597752,0.000002550447,0.0000427274,0.000018789626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9960447,0.0011397955,0.0011417392,0.00057300745,0.0006951451,0.00040560187],"domain_scores_gemma":[0.9971797,0.0006835435,0.0001865834,0.0015353111,0.0003147618,0.00010012686],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0061203884,0.00034544384,0.0005464436,0.00211064,0.00011791912,0.000047201338,0.00039312913,0.0002656719,0.000031764677],"category_scores_gemma":[0.000043549462,0.00026339525,0.0002930624,0.0065620835,0.0001263184,0.0002092711,0.0000021049855,0.0004574944,0.000044686007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030612497,0.0009928399,0.001974864,0.0015670727,0.00021404213,0.0000029681803,0.0012874898,0.9806383,0.0057118786,0.0032861098,0.0014995689,0.0025187035],"study_design_scores_gemma":[0.003108952,0.0011117555,0.019327471,0.002727198,0.00029972923,0.00010806662,0.004010136,0.9092693,0.023854677,0.0013108229,0.033021398,0.0018505099],"about_ca_topic_score_codex":0.00077711896,"about_ca_topic_score_gemma":0.00012727377,"teacher_disagreement_score":0.9237734,"about_ca_system_score_codex":0.0003759013,"about_ca_system_score_gemma":0.000040516763,"threshold_uncertainty_score":0.9999818},"labels":[],"label_agreement":null},{"id":"W4253122965","doi":"10.1109/tpwrs.2002.804989","title":"Modeling competition in transmission expansion","year":2002,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Transmission (telecommunications); Competition (biology); Electricity market; Investment (military); Lagrangian relaxation; Electricity; Transmission system; Reliability (semiconductor); Power transmission; Industrial organization; Perfect competition; Computer science; Economics; Engineering; Microeconomics; Telecommunications; Mathematical optimization; Electrical engineering; Power (physics); Mathematics","score_opus":0.013504323132515579,"score_gpt":0.1958320562223181,"score_spread":0.18232773308980255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253122965","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013925551,0.0007018011,0.97860813,0.000026572412,0.0018708762,0.00044122,0.000007735882,0.000563967,0.0038541697],"genre_scores_gemma":[0.9990039,0.00027744923,0.0002425285,0.000012443788,0.000011381336,0.00009720399,0.0000031139411,0.000064269916,0.00028769765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985233,0.000086020045,0.0005086111,0.00026117326,0.00030089525,0.000320028],"domain_scores_gemma":[0.9995251,0.000034519842,0.000025225872,0.0002760219,0.000041608957,0.00009749866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016269801,0.0002312497,0.0002643748,0.00045714562,0.00008609041,0.000052110034,0.000119369215,0.00018465541,0.00015135643],"category_scores_gemma":[0.0000010229619,0.00024451897,0.000081047234,0.0005475948,0.000009044895,0.00028772623,2.4024732e-7,0.0002908632,0.00016635116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007553273,0.00007956898,0.0000016355025,0.000073474555,0.000013884387,0.0000068956156,0.00066109543,0.9954595,0.0026082126,0.000036646434,0.000095218,0.0009563157],"study_design_scores_gemma":[0.00051972555,0.00006396421,0.0000023066418,0.000333321,0.000010063287,0.00002997225,0.00009761385,0.99620396,0.0019878892,0.0000036497315,0.0004981811,0.0002493475],"about_ca_topic_score_codex":0.00006253455,"about_ca_topic_score_gemma":0.000014403154,"teacher_disagreement_score":0.98507833,"about_ca_system_score_codex":0.0002592468,"about_ca_system_score_gemma":0.0000070465435,"threshold_uncertainty_score":0.9971195},"labels":[],"label_agreement":null},{"id":"W4253879548","doi":"10.1109/59.932291","title":"Time-varying contingency screening for dynamic security assessment using intelligent-systems techniques","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Phasor; Computer science; Stability (learning theory); Reliability engineering; Fuzzy logic; Electric power system; Contingency; Grid; Blackout; Discrete Fourier transform (general); Time domain; Engineering; Control theory (sociology); Real-time computing; Artificial intelligence; Machine learning; Fourier transform; Mathematics; Control (management); Power (physics)","score_opus":0.021100180098552447,"score_gpt":0.28282220298441413,"score_spread":0.26172202288586166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4253879548","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077040726,0.00043244832,0.9818716,0.00001488247,0.0037929185,0.0019046537,0.00016076144,0.0012664227,0.0028522366],"genre_scores_gemma":[0.99582976,0.00004977522,0.0031818952,0.000011288886,0.000019553723,0.0003643978,0.00001394014,0.000104260595,0.00042515603],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976249,0.0001578762,0.00090413546,0.00044315233,0.00035293764,0.000517045],"domain_scores_gemma":[0.9987975,0.00015228883,0.0001441764,0.00052313955,0.00021511696,0.00016782872],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007428185,0.00039355346,0.00055612053,0.00032462913,0.0003554686,0.00021504008,0.0002393997,0.00024516007,0.00007708048],"category_scores_gemma":[0.000006556214,0.0004177447,0.00023620401,0.00039650273,0.000044268018,0.00033922252,0.0000020345753,0.00030596068,0.000021037027],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004814509,0.00016412066,0.00006797084,0.0004686654,0.00027243193,0.000008160957,0.0008788969,0.99205214,0.0050737755,0.00005568851,0.0002210527,0.00068897224],"study_design_scores_gemma":[0.00033615666,0.00008838307,0.000008444544,0.00035994855,0.000054313812,0.00005759767,0.0005222818,0.99022734,0.0010077356,0.0000043454465,0.006886344,0.0004470787],"about_ca_topic_score_codex":0.000098089455,"about_ca_topic_score_gemma":0.000015747959,"teacher_disagreement_score":0.9881257,"about_ca_system_score_codex":0.00049089926,"about_ca_system_score_gemma":0.000044647317,"threshold_uncertainty_score":0.99982744},"labels":[],"label_agreement":null},{"id":"W4254562070","doi":"10.1109/59.910786","title":"Enforcing passivity for admittance matrices approximated by rational functions","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Lightning and Electromagnetic Phenomena","field":"Physics and Astronomy","cited_by":376,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Passivity; Admittance; Rational function; Admittance parameters; Linearization; Positive-definite matrix; Control theory (sociology); Mathematics; Frequency domain; Quadratic equation; Jacobian matrix and determinant; Electric power system; Applied mathematics; Quadratic programming; Mathematical optimization; Voltage; Power (physics); Mathematical analysis; Computer science; Electrical impedance; Engineering; Physics; Nonlinear system","score_opus":0.008349758174591377,"score_gpt":0.2219992354729647,"score_spread":0.21364947729837333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254562070","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037432756,0.0000994435,0.9543565,0.00015606912,0.0012094642,0.00043667926,0.00028949353,0.00011567359,0.005903928],"genre_scores_gemma":[0.9884184,0.0000029698717,0.0001378691,0.00003077376,0.00008024938,0.00048615094,0.00004360813,0.000024159626,0.010775812],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99893665,0.00003543706,0.00026929576,0.00027369751,0.00016975576,0.0003151668],"domain_scores_gemma":[0.9994117,0.0001095947,0.00010141521,0.00020168758,0.00008003464,0.000095593074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011770079,0.0001758327,0.00019063568,0.00007947485,0.00042226052,0.00010395611,0.00010459472,0.00004715703,0.00024297091],"category_scores_gemma":[8.3140793e-7,0.00016438613,0.00011192826,0.00023461269,0.000022683362,0.00018205457,4.6837823e-7,0.00013769355,0.000065360844],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021778832,0.009840319,0.0073409053,0.00066249515,0.004433563,0.000010535777,0.006200914,0.1495576,0.21262023,0.049333435,0.53044325,0.027378885],"study_design_scores_gemma":[0.0099992305,0.0031941943,0.0005333743,0.00047917792,0.0007166001,0.00007358316,0.0037460646,0.129649,0.054602005,0.0018548213,0.79172134,0.0034306243],"about_ca_topic_score_codex":0.00017396908,"about_ca_topic_score_gemma":0.000004463002,"teacher_disagreement_score":0.9542186,"about_ca_system_score_codex":0.00005345922,"about_ca_system_score_gemma":0.00005001342,"threshold_uncertainty_score":0.6703472},"labels":[],"label_agreement":null},{"id":"W4255251875","doi":"10.1109/59.962442","title":"Capacity expansion of small isolated power systems using PV and wind energy","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Renewable energy; Wind power; Reliability engineering; Electric power system; Offset (computer science); Intermittent energy source; Photovoltaic system; Reliability (semiconductor); Photovoltaics; Energy source; Electricity generation; Variable renewable energy; Environmental science; Engineering; Computer science; Distributed generation; Power (physics); Electrical engineering","score_opus":0.01745417003444114,"score_gpt":0.19615982023662756,"score_spread":0.17870565020218643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255251875","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30496883,0.0009790997,0.68781877,0.0000077048435,0.004588805,0.00031054733,0.00005761776,0.00022791135,0.0010406967],"genre_scores_gemma":[0.99927145,0.00013653847,0.00007475861,0.000011887223,0.000014605636,0.000027454107,0.0000013741225,0.000067005414,0.00039493624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99795234,0.00014915464,0.0007646192,0.0003934496,0.0002867637,0.00045365852],"domain_scores_gemma":[0.9988389,0.000097068776,0.00012843721,0.0005833683,0.00016063052,0.00019159463],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034030972,0.0003639521,0.0006118352,0.00026621576,0.00013332642,0.00006939049,0.00017737717,0.00031704613,0.00002130311],"category_scores_gemma":[0.00000492904,0.00034884067,0.0001407643,0.00038858192,0.00009375665,0.00023492394,0.000002056916,0.00025955573,0.000011960873],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016132214,0.00021063104,0.00012711073,0.0009828935,0.0003990475,0.000045717974,0.0020496906,0.9251889,0.06996557,0.00046227156,0.00023775068,0.00016907846],"study_design_scores_gemma":[0.0021997693,0.00075422134,0.0002528011,0.003317233,0.00020888835,0.0015330707,0.0021903366,0.9481852,0.01679273,0.000024748759,0.022938231,0.0016027789],"about_ca_topic_score_codex":0.0016419912,"about_ca_topic_score_gemma":0.00007470751,"teacher_disagreement_score":0.6943026,"about_ca_system_score_codex":0.00019646557,"about_ca_system_score_gemma":0.000035255143,"threshold_uncertainty_score":0.99989635},"labels":[],"label_agreement":null},{"id":"W4285120276","doi":"10.1109/tpwrs.2022.3183549","title":"AC Transmission Network Expansion Planning Using the Line-Wise Model for Representing Meshed Transmission Networks","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Transmission line; Transmission (telecommunications); Electric power transmission; Heuristic; Quadratic equation; Regular polygon; Computer science; Algorithm; Power network; Relaxation (psychology); Integer (computer science); Transmission network; Power (physics); Electric power system; Mathematics; Engineering","score_opus":0.030431408297618784,"score_gpt":0.2624487968848827,"score_spread":0.23201738858726392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285120276","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01210622,0.0017030296,0.98040473,0.00007572969,0.0034549348,0.0013960376,0.000111606634,0.00060629804,0.00014142861],"genre_scores_gemma":[0.99694175,0.000041438623,0.001997076,0.000040079325,0.00009896329,0.00044630226,0.00004697095,0.00014463699,0.00024281394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997276,0.00019448929,0.00074190216,0.0005108857,0.00053597003,0.00074076094],"domain_scores_gemma":[0.99887085,0.00021251403,0.00011763171,0.0005469276,0.00007823299,0.0001738167],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.0008479357,0.00041306246,0.00041068596,0.00014404717,0.0015915928,0.00012217702,0.00037192123,0.00019869352,0.00005114455],"category_scores_gemma":[0.0000027378867,0.0003669951,0.0003589907,0.00057992316,0.00003446539,0.00027213997,0.0000042001197,0.0008245853,0.000002153187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002208719,0.00007349732,0.0000025736929,0.000081193386,0.00008325916,0.0000054923444,0.001007759,0.98909307,0.0063863094,0.000017018187,0.0015852512,0.0014436905],"study_design_scores_gemma":[0.00074196275,0.00014291595,0.0000023482946,0.00024123689,0.00012244274,0.00003802051,0.00046463037,0.9914318,0.0012969451,0.000020800908,0.005093052,0.00040388288],"about_ca_topic_score_codex":0.000025095704,"about_ca_topic_score_gemma":0.0000011214323,"teacher_disagreement_score":0.9848355,"about_ca_system_score_codex":0.00033662756,"about_ca_system_score_gemma":0.00005473436,"threshold_uncertainty_score":0.9998782},"labels":[],"label_agreement":null},{"id":"W4285617244","doi":"10.1109/tpwrs.2020.3029516","title":"IEEE Power &amp; Energy Society","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Global Energy Security and Policy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Power (physics); Electrical engineering; Electric power system; Energy (signal processing); Computer science; Engineering; Physics","score_opus":0.023995158757936366,"score_gpt":0.2392609032347937,"score_spread":0.21526574447685734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285617244","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009908058,0.0007805624,0.7190842,0.0039982265,0.012578068,0.00033586836,0.0003998655,0.001509696,0.25140545],"genre_scores_gemma":[0.9882966,0.000079189296,0.00008925639,0.004843858,0.00015180974,0.00006485967,0.000010719607,0.00007494963,0.006388749],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99771655,0.0001665408,0.00050383876,0.0005554353,0.0004765106,0.0005811067],"domain_scores_gemma":[0.9986787,0.00008634912,0.00011690452,0.00055660366,0.00010354113,0.00045790005],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011281996,0.00040243933,0.00043857424,0.000074975316,0.0002860607,0.00012026339,0.0003834008,0.00037481176,0.0008582342],"category_scores_gemma":[0.0000049450864,0.00039709793,0.00054216647,0.00055308366,0.000092540045,0.00021890251,0.000002081323,0.00038935742,0.0013639032],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031437015,0.0007339281,0.0000028690017,0.00015148068,0.001152227,0.00004454594,0.011919308,0.46856204,0.010953076,0.3263774,0.17873892,0.0010498471],"study_design_scores_gemma":[0.0006275975,0.00017582523,0.000003183643,0.00004007431,0.00004450603,0.000031381864,0.00031345454,0.0011977348,0.0048262957,0.00006634245,0.9922266,0.00044697698],"about_ca_topic_score_codex":0.0072142105,"about_ca_topic_score_gemma":0.0010203848,"teacher_disagreement_score":0.97838855,"about_ca_system_score_codex":0.00012526545,"about_ca_system_score_gemma":0.00008358239,"threshold_uncertainty_score":0.99984807},"labels":[],"label_agreement":null},{"id":"W4285655709","doi":"10.1109/tpwrs.2020.3013179","title":"IEEE Power &amp; Energy Society","year":2020,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Global Energy Security and Policy","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Power (physics); Electrical engineering; Electric power system; Computer science; Engineering; Economics; Physics","score_opus":0.023995158757936366,"score_gpt":0.2392609032347937,"score_spread":0.21526574447685734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285655709","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009908058,0.0007805624,0.7190842,0.0039982265,0.012578068,0.00033586836,0.0003998655,0.001509696,0.25140545],"genre_scores_gemma":[0.9882966,0.000079189296,0.00008925639,0.004843858,0.00015180974,0.00006485967,0.000010719607,0.00007494963,0.006388749],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99771655,0.0001665408,0.00050383876,0.0005554353,0.0004765106,0.0005811067],"domain_scores_gemma":[0.9986787,0.00008634912,0.00011690452,0.00055660366,0.00010354113,0.00045790005],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011281996,0.00040243933,0.00043857424,0.000074975316,0.0002860607,0.00012026339,0.0003834008,0.00037481176,0.0008582342],"category_scores_gemma":[0.0000049450864,0.00039709793,0.00054216647,0.00055308366,0.000092540045,0.00021890251,0.000002081323,0.00038935742,0.0013639032],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031437015,0.0007339281,0.0000028690017,0.00015148068,0.001152227,0.00004454594,0.011919308,0.46856204,0.010953076,0.3263774,0.17873892,0.0010498471],"study_design_scores_gemma":[0.0006275975,0.00017582523,0.000003183643,0.00004007431,0.00004450603,0.000031381864,0.00031345454,0.0011977348,0.0048262957,0.00006634245,0.9922266,0.00044697698],"about_ca_topic_score_codex":0.0072142105,"about_ca_topic_score_gemma":0.0010203848,"teacher_disagreement_score":0.97838855,"about_ca_system_score_codex":0.00012526545,"about_ca_system_score_gemma":0.00008358239,"threshold_uncertainty_score":0.99984807},"labels":[],"label_agreement":null},{"id":"W4286579602","doi":"10.1109/tpwrs.2022.3193133","title":"Optimal Resource Allocation to Enhance Power Grid Resilience Against Hurricanes","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Interdependence; Resource allocation; Resilience (materials science); Operations research; Grid; Electric power system; Integer programming; Resource management (computing); Resource (disambiguation); Mathematical optimization; Distributed computing; Reliability engineering; Power (physics); Engineering; Computer network","score_opus":0.004374827578959838,"score_gpt":0.2225818909108739,"score_spread":0.21820706333191406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286579602","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.231846,0.00013192197,0.7621151,0.00015813959,0.0020702598,0.00040300362,0.00008885692,0.0003340141,0.0028526513],"genre_scores_gemma":[0.9985186,0.000009325805,0.0001917418,0.00016266646,0.00002698198,0.00029513417,0.00000614478,0.000037287682,0.0007521138],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980601,0.00014759092,0.0004182792,0.00042577382,0.0005630771,0.0003851881],"domain_scores_gemma":[0.9990589,0.00007932377,0.000049755163,0.0005987563,0.00006100582,0.00015227277],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035384658,0.0002356015,0.00027542652,0.0003245197,0.0005064339,0.0000729469,0.0003855802,0.000068800095,0.0003004349],"category_scores_gemma":[0.000007282139,0.0002499288,0.00014039045,0.000968199,0.000045835237,0.0001671808,0.0000034928908,0.00045099095,0.00009841783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028105178,0.000045546705,0.0000060854386,0.000022435514,0.000045518776,0.0000058214687,0.0010262947,0.98674774,0.00909072,0.00001630716,0.0023796752,0.00058575807],"study_design_scores_gemma":[0.0007501512,0.0015864137,0.00041945258,0.0002461864,0.00020718563,0.00017457062,0.022774424,0.4342613,0.1765822,0.000012092974,0.36008403,0.0029019918],"about_ca_topic_score_codex":0.000064542255,"about_ca_topic_score_gemma":0.000019691399,"teacher_disagreement_score":0.7666726,"about_ca_system_score_codex":0.00035501918,"about_ca_system_score_gemma":0.00003745456,"threshold_uncertainty_score":0.9999953},"labels":[],"label_agreement":null},{"id":"W4292794815","doi":"10.1109/tpwrs.2022.3200970","title":"Fast SDP Relaxation of the Optimal Power Flow Using the Line-Wise Model for Representing Meshed Transmission Networks","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Solver; Matrix (chemical analysis); Relaxation (psychology); Diagonal; Notation; Hermitian matrix; Semidefinite programming; Mathematical optimization; Mathematics; Applied mathematics; Algorithm; Computer science; Pure mathematics; Geometry; Arithmetic","score_opus":0.01749194654426602,"score_gpt":0.23211119681941875,"score_spread":0.21461925027515272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292794815","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03686722,0.00025550555,0.9577974,0.00008849277,0.0032165574,0.0011501368,0.000304383,0.00017464887,0.00014562593],"genre_scores_gemma":[0.9981099,0.000008535741,0.0012264093,0.000015470208,0.000025764977,0.00023965567,0.000016166368,0.000076324475,0.00028177426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99810183,0.00015214946,0.0006155648,0.00030367845,0.00046379253,0.00036301176],"domain_scores_gemma":[0.99893785,0.00012144469,0.0001630389,0.0005971838,0.000116802854,0.00006369854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005860251,0.00025232948,0.00027057846,0.000099867306,0.0007230068,0.000059034963,0.0003656549,0.00012750972,0.00004355962],"category_scores_gemma":[0.000007387723,0.00019300223,0.00034635642,0.0004855473,0.00004882698,0.0001966822,0.0000054289576,0.00053601747,0.0000013152188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000897119,0.000070016504,0.0000032505234,0.000045391716,0.00008289606,5.4995866e-7,0.0010374631,0.99183214,0.0061366684,0.000031044015,0.00042191215,0.00024895163],"study_design_scores_gemma":[0.00048652396,0.000081392034,0.000008315472,0.00008012959,0.000098008095,0.000019792637,0.00059268804,0.99465156,0.003161226,0.0000055731657,0.0006143189,0.00020047328],"about_ca_topic_score_codex":0.000029660874,"about_ca_topic_score_gemma":0.000003468776,"teacher_disagreement_score":0.9612427,"about_ca_system_score_codex":0.0002814036,"about_ca_system_score_gemma":0.00005115987,"threshold_uncertainty_score":0.78704023},"labels":[],"label_agreement":null},{"id":"W4297900749","doi":"10.1109/59.918302","title":"A practical hydro, dynamic unit commitment and loading model","year":2001,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Burnaby Hospital","funders":"","keywords":"Power system simulation; Schedule; Hydroelectricity; Dynamic programming; Mathematical optimization; Unit (ring theory); Computer science; Production schedule; Engineering; Electric power system; Scheduling (production processes); Power (physics); Mathematics","score_opus":0.019011430375225007,"score_gpt":0.25362840021965627,"score_spread":0.23461696984443126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297900749","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011758124,0.0003698063,0.981607,0.00007360158,0.0012248493,0.0003925107,0.000014019837,0.00045087765,0.0041091666],"genre_scores_gemma":[0.99716544,0.00023202263,0.001126203,0.000025314906,0.0000065572485,0.000094733354,0.0000036012386,0.000063409025,0.0012827342],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987441,0.000076170036,0.0003531807,0.00025448695,0.0002494844,0.0003225983],"domain_scores_gemma":[0.99933136,0.00009289129,0.000044173143,0.00032926598,0.000057418027,0.00014491745],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015423003,0.00023065144,0.0002641793,0.00020866381,0.00012719193,0.0001077515,0.000077138524,0.00015117593,0.000023667912],"category_scores_gemma":[0.0000034350553,0.000246122,0.000057009,0.00035503035,0.000021131247,0.00025978568,8.254395e-7,0.0002797665,0.000044399872],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013290269,0.00008039152,0.000013097127,0.000061767976,0.00011228057,0.00003037667,0.00025878102,0.9972437,0.0014886612,0.00013200102,0.00043186222,0.00013376558],"study_design_scores_gemma":[0.0003979911,0.00006149677,0.0000067641076,0.00011194016,0.00004557194,0.000441265,0.00015408649,0.9967701,0.0006616821,0.000005598009,0.0010962685,0.00024726306],"about_ca_topic_score_codex":0.000023573755,"about_ca_topic_score_gemma":0.00002731171,"teacher_disagreement_score":0.9854073,"about_ca_system_score_codex":0.00022803507,"about_ca_system_score_gemma":0.000035147386,"threshold_uncertainty_score":0.9999991},"labels":[],"label_agreement":null},{"id":"W4312253434","doi":"10.1109/tpwrs.2022.3217941","title":"Distributionally Robust Optimal Power Flow via Ellipsoidal Approximation","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mathematical optimization; Probabilistic logic; Renewable energy; Robust optimization; Computer science; Schedule; Electric power system; Upper and lower bounds; Probability distribution; Power flow; Power (physics); Engineering; Mathematics","score_opus":0.007296792219374998,"score_gpt":0.18119723446507371,"score_spread":0.17390044224569873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312253434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034837069,0.00024285755,0.98562807,0.00004941666,0.006453167,0.00078976207,0.00040769446,0.0009333089,0.0020120472],"genre_scores_gemma":[0.9969708,0.0000086245545,0.0012164993,0.00002311627,0.000027363358,0.000661582,0.00010794054,0.00010183572,0.0008822901],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974753,0.00018758107,0.00064433063,0.00041259913,0.00078629114,0.0004938521],"domain_scores_gemma":[0.9990738,0.00007831776,0.00010606999,0.0004807851,0.00011456729,0.00014643381],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042336038,0.00035199663,0.00033975477,0.00034799348,0.0005116691,0.000112197806,0.000312266,0.00013942482,0.00060021225],"category_scores_gemma":[0.0000033490062,0.00040954674,0.00017987302,0.0008346558,0.000027033282,0.00032397552,0.0000029732544,0.0005594219,0.0001727702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003700155,0.00014480905,0.0000035605135,0.000045817138,0.000124849,0.00000965353,0.0003086357,0.9953181,0.00097147,0.00011977077,0.0027487255,0.0001675645],"study_design_scores_gemma":[0.0005586333,0.00022895291,0.000013589865,0.000027135256,0.00003916608,0.00021134855,0.0002010328,0.99009323,0.0013977571,0.0000046172904,0.0067644273,0.00046012906],"about_ca_topic_score_codex":0.000022708222,"about_ca_topic_score_gemma":0.000002638869,"teacher_disagreement_score":0.99348706,"about_ca_system_score_codex":0.000951311,"about_ca_system_score_gemma":0.00006650217,"threshold_uncertainty_score":0.9998356},"labels":[],"label_agreement":null},{"id":"W4312671043","doi":"10.1109/tpwrs.2022.3212925","title":"Fast Optimal Power Flow With Guarantees via an Unsupervised Generative Model","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Computer science; Generative model; Mathematical optimization; Grid; Range (aeronautics); Granularity; Power flow; Electric power system; Generative grammar; Data mining; Power (physics); Artificial intelligence; Engineering; Mathematics","score_opus":0.009250292995344899,"score_gpt":0.19973465466628917,"score_spread":0.19048436167094426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312671043","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12863934,0.00011809997,0.8662962,0.000028825518,0.001770072,0.0005476047,0.0011509018,0.00065166573,0.00079732615],"genre_scores_gemma":[0.99679226,0.0000049244636,0.002154821,0.000042652653,0.000017407865,0.0004609196,0.00007437471,0.0001229194,0.0003297497],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979293,0.00012215304,0.00039883942,0.00047263296,0.0005843504,0.0004927439],"domain_scores_gemma":[0.9990769,0.000023703467,0.000046437486,0.0005679768,0.00010529446,0.00017967507],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018548858,0.00041648213,0.00036501276,0.00022468841,0.00047161814,0.00011598514,0.00030491027,0.00010683593,0.00036906195],"category_scores_gemma":[6.0754166e-7,0.0004156824,0.00013152671,0.00043041472,0.00005408407,0.00048202582,0.000002589395,0.0005637185,0.00006893815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012831039,0.00023534028,0.0000027640044,0.000022828015,0.00016169978,0.000022991175,0.0017488572,0.98795366,0.009051138,0.00004314518,0.00050723524,0.000122046105],"study_design_scores_gemma":[0.00083914265,0.0007977463,0.000009198467,0.000023619063,0.00005241671,0.00010786595,0.0012742642,0.99053854,0.005215306,0.0000028033662,0.00062146457,0.00051761407],"about_ca_topic_score_codex":0.000041650397,"about_ca_topic_score_gemma":0.000020233954,"teacher_disagreement_score":0.8681529,"about_ca_system_score_codex":0.0004363516,"about_ca_system_score_gemma":0.00006212997,"threshold_uncertainty_score":0.99982953},"labels":[],"label_agreement":null},{"id":"W4313129946","doi":"10.1109/tpwrs.2022.3228838","title":"MILP Model for Optimal Day-Ahead PDS Scheduling Considering TSO-DSO Interconnection Power Flow Commitment Under Uncertainty","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Simon Fraser University","funders":"","keywords":"Dispatchable generation; Interconnection; Integer programming; Linear programming; Scheduling (production processes); Mathematical optimization; Distributed generation; AC power; Computer science; Power flow; Electric power system; Voltage; Engineering; Power (physics); Reliability engineering; Electrical engineering; Renewable energy; Mathematics; Telecommunications","score_opus":0.023281958343277617,"score_gpt":0.24262198075374708,"score_spread":0.21934002241046946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313129946","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07451445,0.00024105614,0.9142978,0.00012687605,0.0077102473,0.0011569512,0.00094557257,0.00074657344,0.00026045705],"genre_scores_gemma":[0.995888,0.000009103452,0.0024135192,0.00008233017,0.000030376355,0.0011118712,0.00008133045,0.00012898564,0.00025450447],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99753785,0.0001227246,0.0006906946,0.0005388025,0.00047169754,0.0006382147],"domain_scores_gemma":[0.99886626,0.00018242479,0.00009013802,0.00054976234,0.00012995384,0.00018144882],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005934223,0.00045501007,0.00045944043,0.00030642177,0.00066976855,0.0001458005,0.00026228893,0.00017272345,0.00018217355],"category_scores_gemma":[0.000007976809,0.000538915,0.00032059493,0.00032231346,0.000051706273,0.00032906877,0.000007379435,0.00066966855,0.000040151353],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011676617,0.00017124861,0.0000017831977,0.00008037164,0.00024986925,0.0000043808454,0.0009827311,0.9938438,0.003134453,0.00025304596,0.0010200704,0.00014150908],"study_design_scores_gemma":[0.0011640404,0.0003713642,0.000002636207,0.00008489285,0.00008361158,0.00005737228,0.0025315473,0.99048454,0.0019758265,0.000035299694,0.0026689447,0.0005399477],"about_ca_topic_score_codex":0.00006192658,"about_ca_topic_score_gemma":0.000043982356,"teacher_disagreement_score":0.92137355,"about_ca_system_score_codex":0.0015824297,"about_ca_system_score_gemma":0.000081230755,"threshold_uncertainty_score":0.9997062},"labels":[],"label_agreement":null},{"id":"W4313434117","doi":"10.1109/tpwrs.2022.3220056","title":"Data-Driven Extension of “Measurement-Based Fast Coordinated Voltage Control for Transmission Grids”","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Waterloo","funders":"Electric Power Research Institute","keywords":"Sensitivity (control systems); Voltage; Controller (irrigation); Control theory (sociology); Computer science; Transmission (telecommunications); Grid; Extension (predicate logic); AC power; Electric power system; Voltage controller; Power transmission; Least-squares function approximation; Electric power transmission; Electronic engineering; Power (physics); Control (management); Engineering; Voltage regulator; Electrical engineering; Mathematics; Voltage droop; Telecommunications","score_opus":0.030864020658675707,"score_gpt":0.2350465666966868,"score_spread":0.2041825460380111,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313434117","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007179537,0.0002631135,0.99026257,0.000042995616,0.0030795955,0.0014787163,0.0035871523,0.00035447252,0.00021340717],"genre_scores_gemma":[0.9991345,0.0000037304476,0.00022421278,0.000026516154,0.0000047934623,0.00035604482,0.00008144779,0.000059730268,0.000109027606],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978873,0.0001912844,0.0006784898,0.00040376117,0.00056134624,0.00027782956],"domain_scores_gemma":[0.99857426,0.000117343036,0.000110094355,0.0008338835,0.00024254454,0.00012190612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008838284,0.00024190675,0.00045723634,0.00021924438,0.0002727211,0.00002929427,0.00038302926,0.000087880755,0.00018476984],"category_scores_gemma":[0.000008123496,0.00024370513,0.00016295059,0.0003272491,0.00003072527,0.00014378398,0.0000016127988,0.00022161302,0.0000053856197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022084812,0.00023317798,0.000007628211,0.00031271775,0.000108184315,0.0000018676263,0.00014792937,0.97916305,0.017616492,0.0000137860925,0.0018772008,0.00029712124],"study_design_scores_gemma":[0.0025024505,0.00027735287,0.00002257567,0.00009634597,0.000077426805,0.000006177162,0.00028681313,0.96942616,0.0026596019,0.0000010278242,0.024390552,0.0002534949],"about_ca_topic_score_codex":0.000039269744,"about_ca_topic_score_gemma":0.000013839989,"teacher_disagreement_score":0.99841654,"about_ca_system_score_codex":0.0002553552,"about_ca_system_score_gemma":0.00008617637,"threshold_uncertainty_score":0.99380064},"labels":[],"label_agreement":null},{"id":"W4313546726","doi":"10.1109/tpwrs.2023.3233994","title":"A Novel Hybrid Approach Based on Analytical and Metaheuristic Algorithms for Parameters and Dynamic Resistance Estimation of a PV Array","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Photovoltaic System Optimization Techniques","field":"Energy","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Jordan University of Science and Technology","keywords":"Photovoltaic system; Metaheuristic; Computer science; Power flow; Algorithm; Grid; Mathematical optimization; Electric power system; Power (physics); Engineering; Mathematics","score_opus":0.024854204508725615,"score_gpt":0.2690082437521291,"score_spread":0.2441540392434035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313546726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027245774,0.000034810702,0.994774,0.00005358262,0.00029822465,0.0010084667,0.00030281406,0.00031144553,0.0004920908],"genre_scores_gemma":[0.9591365,0.000010741912,0.039628375,0.00003076647,0.0000030019123,0.000643563,0.000030545132,0.0000490632,0.0004674812],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998381,0.00009672226,0.0005304565,0.0004473801,0.00031879375,0.00022560934],"domain_scores_gemma":[0.99872893,0.0004903117,0.0001754237,0.00037849954,0.00013026767,0.000096576994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050422834,0.0002270836,0.00044113197,0.00048121798,0.000118022675,0.000059193742,0.00010143642,0.000105506246,0.0000029374044],"category_scores_gemma":[0.000059202102,0.00021684445,0.00010103065,0.00045211206,0.000095269206,0.00009742632,8.3452124e-7,0.00010810782,0.0000030007898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024461193,0.00023117791,0.0000019839379,0.00061416515,0.0001668504,0.0000025196268,0.00020947758,0.99366724,0.003443866,0.00056828174,0.0002516361,0.0005982097],"study_design_scores_gemma":[0.00078245375,0.00019334375,0.000022526056,0.00021817138,0.000100201985,0.000013978798,0.00012898065,0.9899231,0.008180192,0.000056252793,0.0001785689,0.00020219275],"about_ca_topic_score_codex":0.00017515228,"about_ca_topic_score_gemma":0.000017493436,"teacher_disagreement_score":0.9564119,"about_ca_system_score_codex":0.0000952912,"about_ca_system_score_gemma":0.000037679965,"threshold_uncertainty_score":0.88426596},"labels":[],"label_agreement":null},{"id":"W4320005515","doi":"10.1109/tpwrs.2023.3242450","title":"Reliability Assessment of Distribution Stations Considering Spare Transformer Sharing","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Spare part; Reliability engineering; Transformer; Probabilistic logic; Markov chain; Reliability (semiconductor); Distribution transformer; Engineering; Computer science; Markov process; Markov model; Mathematics; Statistics; Operations management; Electrical engineering; Voltage","score_opus":0.017153304476168797,"score_gpt":0.25683318032154173,"score_spread":0.23967987584537293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320005515","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09315962,0.00004585547,0.8993758,0.000043298194,0.0032959806,0.000611055,0.00078024046,0.000762012,0.0019261213],"genre_scores_gemma":[0.9992947,0.000059148606,0.00008976581,0.000004558612,0.00000780167,0.00022508629,0.000031617987,0.000037487094,0.00024984704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982091,0.000055666384,0.0006916762,0.00032460777,0.00033900046,0.00037993593],"domain_scores_gemma":[0.9989987,0.00016541951,0.00006390994,0.000527964,0.0001326099,0.000111371664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005723697,0.00022289829,0.00037210606,0.00015370872,0.0001406891,0.000043047625,0.00016871846,0.00012970397,0.00004483414],"category_scores_gemma":[0.00001076739,0.0002234164,0.00016965934,0.0005974417,0.00006668276,0.00025257719,9.957862e-7,0.0002703181,0.00005753113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010491284,0.00008073799,0.00020048571,0.0008059231,0.00009903675,0.0000050693166,0.00065354625,0.9922202,0.0042918213,0.00073585083,0.0007508489,0.00014597287],"study_design_scores_gemma":[0.0020072248,0.0004268265,0.013286251,0.0019465995,0.00019399513,0.000061151,0.0044292407,0.91543525,0.031391095,0.00031916477,0.02906519,0.0014379784],"about_ca_topic_score_codex":0.00011424188,"about_ca_topic_score_gemma":0.00004785318,"teacher_disagreement_score":0.9061351,"about_ca_system_score_codex":0.00030774105,"about_ca_system_score_gemma":0.00005118856,"threshold_uncertainty_score":0.91106564},"labels":[],"label_agreement":null},{"id":"W4328007353","doi":"10.1109/tpwrs.2023.3259242","title":"A Comprehensive Reliability Strategy for Managing Assets of Redundant Customer Delivery Systems","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada)","funders":"","keywords":"Reliability (semiconductor); Reliability engineering; Computer science; Remedial action; Engineering; Power (physics)","score_opus":0.025254768440019254,"score_gpt":0.24941934848628244,"score_spread":0.2241645800462632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4328007353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.098889105,0.0009335638,0.87787026,0.000047051646,0.014457574,0.0026591502,0.00079211243,0.0014364922,0.0029147135],"genre_scores_gemma":[0.9982525,0.00014009207,0.000044901175,0.0000072669436,0.000021502643,0.00056926155,0.000010501728,0.00008147341,0.0008724923],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997487,0.00013990774,0.00092468224,0.00047418202,0.00039002547,0.00058420585],"domain_scores_gemma":[0.99816704,0.00042572196,0.00013129614,0.00077577424,0.00034856345,0.00015159213],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00060466793,0.00035565288,0.00070310617,0.0003688428,0.0001498973,0.00007521871,0.00029278803,0.00022241074,0.000009276325],"category_scores_gemma":[0.00000837009,0.00034567463,0.00029643532,0.0006487102,0.0000933211,0.00023338526,0.000002444351,0.0002741731,0.00016515142],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007523542,0.000075796765,0.000009477671,0.0032534855,0.00021008783,0.000010643742,0.00039018344,0.986977,0.003940212,0.00034646227,0.004523516,0.00018794193],"study_design_scores_gemma":[0.0025470161,0.00076750806,0.00044986603,0.0027772582,0.0002416364,0.00012620127,0.007361846,0.89143395,0.008586862,0.00012644763,0.08400458,0.0015768345],"about_ca_topic_score_codex":0.00032812322,"about_ca_topic_score_gemma":0.000014626626,"teacher_disagreement_score":0.8993634,"about_ca_system_score_codex":0.00025465825,"about_ca_system_score_gemma":0.00005877872,"threshold_uncertainty_score":0.9998995},"labels":[],"label_agreement":null},{"id":"W4361761737","doi":"10.1109/tpwrs.2023.3262421","title":"A Rapid Method for Impact Analysis of Grid-Edge Technologies on Power Distribution Networks","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Reliability and Maintenance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; Group for Research in Decision Analysis","funders":"Institut de Valorisation des Données; Eaton Corporation","keywords":"Monte Carlo method; Probability density function; Grid; Computer science; Electric power system; Stochastic process; Mathematical optimization; Probability distribution; Enhanced Data Rates for GSM Evolution; Cumulative distribution function; Power grid; Power (physics); Mathematics; Telecommunications; Physics; Statistics","score_opus":0.013762920392573019,"score_gpt":0.26562247334792444,"score_spread":0.2518595529553514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4361761737","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076288357,0.00037451668,0.9832773,0.00006045426,0.004249045,0.00082292256,0.0018917347,0.0014629978,0.00023219215],"genre_scores_gemma":[0.9990943,0.00011548154,0.000107420725,0.0000059778567,0.0000109294315,0.0004034268,0.00007192641,0.000043549833,0.00014698414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99814224,0.00009733264,0.00062238297,0.00038124403,0.0002532638,0.0005035524],"domain_scores_gemma":[0.9984339,0.0005008735,0.00011399674,0.0007379915,0.00013638602,0.00007685199],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00082660443,0.00031365207,0.0007378654,0.0006609564,0.00011535444,0.00004348727,0.00026809893,0.00032893923,0.000021067068],"category_scores_gemma":[0.000027106811,0.00026669554,0.0007058157,0.0024670118,0.000054146283,0.00011751397,0.0000018379403,0.0002766923,0.000028736227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008865003,0.00007799659,0.000013126528,0.00014661546,0.001603374,0.000002665965,0.00022245858,0.9902373,0.0005899092,0.00021298452,0.00564121,0.0011636969],"study_design_scores_gemma":[0.000638968,0.0006397655,0.00056639593,0.00029630994,0.0006760397,0.000008547005,0.00096669357,0.97453916,0.005830379,0.000028434411,0.0153019745,0.00050731626],"about_ca_topic_score_codex":0.000073302734,"about_ca_topic_score_gemma":0.000026453876,"teacher_disagreement_score":0.99146545,"about_ca_system_score_codex":0.00029839508,"about_ca_system_score_gemma":0.000023295808,"threshold_uncertainty_score":0.99997854},"labels":[],"label_agreement":null},{"id":"W4378365088","doi":"10.1109/tpwrs.2023.3280434","title":"EVSE Effectiveness in Multi-Unit Residential Buildings Using Composite Optimization and Heuristic Search","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Vehicles and Infrastructure","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science; Heuristic; Schedule; Reliability engineering; Energy management; Operating cost; Operations research; Engineering; Energy (signal processing); Artificial intelligence","score_opus":0.018732742718215914,"score_gpt":0.2595084655496591,"score_spread":0.24077572283144322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378365088","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44067547,0.00006637548,0.5584142,0.0000022568188,0.00047950324,0.00019645336,0.000010536162,0.00013925404,0.000015939715],"genre_scores_gemma":[0.99930125,0.00004707325,0.0005319382,0.0000027674957,0.000009245199,0.000020021906,0.0000030023577,0.000039567232,0.000045141318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913156,0.000095219955,0.00020250119,0.00017973641,0.00015222318,0.00023877434],"domain_scores_gemma":[0.99967456,0.000091578215,0.000016794575,0.000120611105,0.000036921396,0.000059557715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020867873,0.00013890842,0.00018109735,0.00040346937,0.000113844006,0.00008054866,0.00006824853,0.00010613845,0.000012202404],"category_scores_gemma":[0.0000016599718,0.00014813033,0.00003281247,0.0006202285,0.000020437077,0.00014777452,0.0000011355103,0.0002565374,0.000013540579],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002391327,0.000012358314,0.00022590527,0.00017097477,0.000027258844,0.0000137902925,0.00022317746,0.97472715,0.024443667,0.000005742161,0.000011284679,0.000114762064],"study_design_scores_gemma":[0.0006031499,0.000036562447,0.0030879737,0.00018621192,0.000015469903,0.000033816214,0.00007263367,0.9881709,0.007618122,0.0000016931531,0.000020168827,0.00015327484],"about_ca_topic_score_codex":0.00027450564,"about_ca_topic_score_gemma":0.000014671916,"teacher_disagreement_score":0.55862576,"about_ca_system_score_codex":0.00010201341,"about_ca_system_score_gemma":0.000013303487,"threshold_uncertainty_score":0.60405797},"labels":[],"label_agreement":null},{"id":"W4381199059","doi":"10.1109/tpwrs.2023.3287151","title":"Resilient Dynamic State Estimation for Multi-Machine Power System With Partial Missing Measurements","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Engineering and Physical Sciences Research Council; National Natural Science Foundation of China","keywords":"Robustness (evolution); Kalman filter; Electric power system; Extended Kalman filter; Computer science; Control theory (sociology); Reliability (semiconductor); Data loss; Resilience (materials science); Reliability engineering; Engineering; Power (physics); Artificial intelligence","score_opus":0.029330559054012394,"score_gpt":0.2628542734040066,"score_spread":0.2335237143499942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381199059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0042602806,0.00012077984,0.98798925,0.000027374828,0.0037859203,0.0015263482,0.00030840308,0.0016654825,0.0003161735],"genre_scores_gemma":[0.99720895,0.0000035801227,0.0017363573,0.000006670105,0.0000015443355,0.00044455557,0.000027397231,0.000099500605,0.00047141797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99788475,0.00012470203,0.00064373756,0.00040464068,0.00048441216,0.000457745],"domain_scores_gemma":[0.99899524,0.00007724929,0.00010078869,0.0004796797,0.0001666769,0.00018033278],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0006258946,0.00033206295,0.00038847091,0.00030040534,0.0002822644,0.00014251776,0.00014990922,0.00011305802,0.000014710735],"category_scores_gemma":[0.0000084612,0.0002972342,0.00012233146,0.0005086457,0.000031072195,0.00022517005,9.539701e-7,0.00015917068,0.00010754868],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009912263,0.00007111008,0.000025791605,0.00051352725,0.00015820614,0.000004362651,0.0008013484,0.99742824,0.0006444692,0.000011299095,0.00013345567,0.00010907276],"study_design_scores_gemma":[0.0012602818,0.00013619385,0.000101989666,0.00037421248,0.000046739133,0.00001644237,0.00036202816,0.9952975,0.0014797393,4.7559e-7,0.0005995183,0.00032490512],"about_ca_topic_score_codex":0.000044205677,"about_ca_topic_score_gemma":0.000089782916,"teacher_disagreement_score":0.9929487,"about_ca_system_score_codex":0.00045446138,"about_ca_system_score_gemma":0.000048819944,"threshold_uncertainty_score":0.99994797},"labels":[],"label_agreement":null},{"id":"W4386472810","doi":"10.1109/tpwrs.2023.3312406","title":"Optimized Unsymmetrical Per-Phase Droop for Soft Line Switching of Reconfigurable Unbalanced Inverter-Based Islanded Microgrid","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; York University","funders":"ASPIRE; Khalifa University of Science, Technology and Research; Advanced Technology Research Council","keywords":"Voltage droop; Microgrid; Control reconfiguration; Control theory (sociology); Inverter; Transient (computer programming); MATLAB; Power (physics); Line (geometry); Reliability (semiconductor); Voltage; Process (computing); Computer science; Engineering; Three-phase; Control (management); Voltage source; Electrical engineering; Mathematics","score_opus":0.016101261139736905,"score_gpt":0.245926051992567,"score_spread":0.2298247908528301,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386472810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009018951,0.00040285962,0.9861509,0.000075064345,0.0024588024,0.000858027,0.0002399478,0.00065178616,0.00014362336],"genre_scores_gemma":[0.998048,0.00011931198,0.0011821901,0.000036062676,0.000033948232,0.0002638797,0.000050805338,0.00007582301,0.00019000012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99848396,0.000050972776,0.00061113096,0.00028389363,0.00018855909,0.00038150809],"domain_scores_gemma":[0.9990697,0.00027649014,0.00009623265,0.00031067073,0.00013750957,0.00010942172],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029645438,0.00026089215,0.000515383,0.00054940506,0.00012698908,0.00006524019,0.00016909394,0.0001816266,0.00005536194],"category_scores_gemma":[0.0000119691185,0.00025431643,0.00024636363,0.00072709174,0.000016347645,0.00012117802,4.7676065e-7,0.00020124715,0.00004754655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027069097,0.00013817812,0.0000014772742,0.00021674304,0.00014643496,0.000002392347,0.00015424992,0.93093085,0.06254166,0.0000034890795,0.0009080228,0.0046858285],"study_design_scores_gemma":[0.0057273684,0.0002801131,0.0000015911994,0.00012501133,0.000070730806,0.000005189452,0.00008607,0.9369644,0.054562602,0.000004627079,0.001915889,0.000256415],"about_ca_topic_score_codex":0.000041100855,"about_ca_topic_score_gemma":0.000008642397,"teacher_disagreement_score":0.98902905,"about_ca_system_score_codex":0.00008608098,"about_ca_system_score_gemma":0.000046416117,"threshold_uncertainty_score":0.9999909},"labels":[],"label_agreement":null},{"id":"W4386590664","doi":"10.1109/tpwrs.2023.3314372","title":"Incorporating System Frequency Dynamics Into Real-Time Locational Marginal Pricing of Electricity","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Electric power system; Electricity market; Automatic frequency control; Electricity; System dynamics; Economic dispatch; Offset (computer science); Marginal cost; Lagrange multiplier; Electric power transmission; Electricity pricing; Upgrade; Wind power; Mathematical optimization; Control theory (sociology); Power (physics); Control (management); Economics; Engineering; Telecommunications; Microeconomics; Mathematics","score_opus":0.005361028158020068,"score_gpt":0.19783565564652614,"score_spread":0.19247462748850608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386590664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031751566,0.000074039075,0.95723623,0.00001594128,0.0019981314,0.0006518529,0.000057519486,0.0016838934,0.0065308535],"genre_scores_gemma":[0.9982962,0.000024589566,0.0009915945,0.0000021540877,0.00002703476,0.00014440597,0.00003909355,0.00009840957,0.0003765068],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99759,0.00014726057,0.0009280902,0.00034199347,0.0005798035,0.00041284584],"domain_scores_gemma":[0.99875045,0.0002014374,0.0002354235,0.00044497394,0.00025459626,0.00011312394],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00063214585,0.00031350556,0.00047841883,0.0008497534,0.00019170232,0.000059102415,0.00026445245,0.00021851661,0.000012743524],"category_scores_gemma":[0.000009892616,0.00034596454,0.00011969832,0.0024865016,0.000033444365,0.00027361384,0.0000015880314,0.00028172214,0.0002235789],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001524801,0.000044406726,0.00011890292,0.0009028668,0.00016535331,0.000013358699,0.0004100427,0.977503,0.018065728,0.002277881,0.00026904012,0.00021417001],"study_design_scores_gemma":[0.00029582946,0.00012382978,0.000112013004,0.00043483224,0.000043257587,0.000056400215,0.00028145238,0.99362046,0.0046753474,0.000022209399,0.000010893786,0.00032349417],"about_ca_topic_score_codex":0.0005091448,"about_ca_topic_score_gemma":0.00003670393,"teacher_disagreement_score":0.9665446,"about_ca_system_score_codex":0.0012630757,"about_ca_system_score_gemma":0.00012941154,"threshold_uncertainty_score":0.9998992},"labels":[],"label_agreement":null},{"id":"W4389371462","doi":"10.1109/tpwrs.2023.3337011","title":"Data-Driven Fast Frequency Control Using Inverter-Based Resources","year":2023,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Frequency Control in Power Systems","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Waterloo","funders":"","keywords":"Dispatchable generation; Automatic frequency control; Controller (irrigation); Inverter; Parametric statistics; Electric power system; Computer science; Power control; Renewable energy; Control theory (sociology); Control (management); Identification (biology); Power (physics); Control engineering; Microgrid; AC power; Engineering; Electronic engineering; Distributed generation; Telecommunications; Electrical engineering","score_opus":0.035259128469559455,"score_gpt":0.24667144751998904,"score_spread":0.2114123190504296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389371462","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019925205,0.0005083032,0.957112,0.00006746753,0.013815181,0.00097101566,0.0020051931,0.0027733538,0.002822254],"genre_scores_gemma":[0.9989803,0.000009558259,0.00014677584,0.000068892965,0.00009964346,0.00017626239,0.000032032243,0.00017846566,0.0003080855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99687165,0.00023976878,0.00086532003,0.0006432681,0.00063478464,0.0007451868],"domain_scores_gemma":[0.9974603,0.00026515484,0.000117428266,0.001812935,0.00010697172,0.00023722534],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005211658,0.00048931065,0.00064777094,0.00071303477,0.00024513237,0.00022313262,0.0009552324,0.00028681676,0.00009311611],"category_scores_gemma":[0.00000870752,0.0004985876,0.0001802604,0.000975333,0.000091580114,0.00049288245,0.000002425923,0.00047748868,0.00085849635],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019160625,0.000048543046,0.00006398035,0.00020541597,0.0003374584,0.00007672713,0.0003756083,0.9796568,0.0154804215,0.000027062299,0.0035133166,0.00019549494],"study_design_scores_gemma":[0.0013079533,0.00009024112,0.000041750038,0.00031517117,0.00010239086,0.00003510706,0.00027423722,0.99074656,0.00040350642,0.000005454771,0.0061545577,0.0005230526],"about_ca_topic_score_codex":0.000560277,"about_ca_topic_score_gemma":0.00018923629,"teacher_disagreement_score":0.9790551,"about_ca_system_score_codex":0.00032329623,"about_ca_system_score_gemma":0.00008307807,"threshold_uncertainty_score":0.9999195},"labels":[],"label_agreement":null},{"id":"W4391696955","doi":"10.1109/tpwrs.2024.3364502","title":"Flexibility Characterization of Sustainable Power Systems in Demand Space: A Data-Driven Inverse Optimization Approach","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Institut de Valorisation des Données","keywords":"Electric power system; Mathematical optimization; Computer science; Flexibility (engineering); Renewable energy; Robust optimization; Mathematics; Power (physics); Engineering","score_opus":0.015098532778809662,"score_gpt":0.22586097018666046,"score_spread":0.2107624374078508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391696955","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011033248,0.0007406894,0.98042744,0.000015853293,0.0033118976,0.0018771926,0.00023102858,0.00067592476,0.0016867433],"genre_scores_gemma":[0.99771583,0.00013945765,0.0007196052,0.0000040949863,0.000017998533,0.00025033441,0.00019694753,0.00011569787,0.0008400562],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970955,0.00027368544,0.0009884902,0.0006729531,0.0004734592,0.00049591635],"domain_scores_gemma":[0.99842566,0.000091795155,0.0001281134,0.0010475798,0.00018788729,0.00011895765],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008935975,0.00037820972,0.00057186105,0.00094640575,0.00008424459,0.00025793776,0.00038400487,0.0003259435,0.000032606225],"category_scores_gemma":[0.000013678486,0.0003943847,0.00008808793,0.0017799139,0.000044337485,0.001257545,0.000005741719,0.00036815813,0.000021274687],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003030789,0.00013523106,0.000019179712,0.0016682134,0.00013653198,0.000019349605,0.0011452418,0.99415535,0.0020102672,0.00042969472,0.00023487779,0.000015768428],"study_design_scores_gemma":[0.00039344432,0.00008447267,0.000023734447,0.00043720458,0.00006048225,0.000040786388,0.0007733644,0.9964648,0.0005706478,0.0000011802812,0.0008093484,0.0003405451],"about_ca_topic_score_codex":0.00024163254,"about_ca_topic_score_gemma":0.000010519011,"teacher_disagreement_score":0.98668253,"about_ca_system_score_codex":0.0006394054,"about_ca_system_score_gemma":0.00014024603,"threshold_uncertainty_score":0.9998508},"labels":[],"label_agreement":null},{"id":"W4391984993","doi":"10.1109/tpwrs.2024.3367967","title":"Improving Linear OPF Model via Incorporating Bias Factor of Optimality Condition","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"AC power; Control theory (sociology); Mathematical optimization; Power factor; Linear programming; Computer science; Mathematics; Engineering; Voltage","score_opus":0.023403919062213084,"score_gpt":0.24841928163720503,"score_spread":0.22501536257499194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391984993","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07384106,0.00021624351,0.9202848,0.0000102318245,0.002948365,0.00035370592,0.0011298244,0.0007736254,0.000442113],"genre_scores_gemma":[0.9984832,0.000005323927,0.0012253961,0.000004326191,0.000026543003,0.000059189468,0.000035952693,0.00006686081,0.00009323454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850243,0.000046884394,0.0005950362,0.0002949079,0.00030520072,0.000255526],"domain_scores_gemma":[0.9993383,0.00007864687,0.00007238107,0.0003090968,0.0001024157,0.00009913668],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023888642,0.0002596142,0.00029735174,0.00022102363,0.000081992,0.00009085712,0.00012589844,0.00019151557,0.00004105846],"category_scores_gemma":[0.000005476528,0.00026885053,0.00016992312,0.0003481758,0.000045603752,0.0004756908,0.0000013152982,0.00037048018,0.00009200471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012147151,0.000044136512,0.0000035314554,0.0005478661,0.00008912319,0.0000058511064,0.00020456356,0.9332624,0.065102585,0.00014399325,0.000099315985,0.0004844528],"study_design_scores_gemma":[0.0001531085,0.000098209806,0.0000082081415,0.00021474248,0.000039646355,0.000015337926,0.000068126865,0.94855386,0.05053509,0.00001653271,0.000063071035,0.00023408457],"about_ca_topic_score_codex":0.00010708825,"about_ca_topic_score_gemma":0.000008244081,"teacher_disagreement_score":0.9246421,"about_ca_system_score_codex":0.0002740873,"about_ca_system_score_gemma":0.00005695998,"threshold_uncertainty_score":0.9999764},"labels":[],"label_agreement":null},{"id":"W4392152135","doi":"10.1109/tpwrs.2024.3369591","title":"Physics-Guided Multi-Agent Adversarial Reinforcement Learning for Robust Active Voltage Control With Peer-to-Peer (P2P) Energy Trading","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; McGill University; Carleton University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Reinforcement learning; Adversarial system; Peer-to-peer; Computer science; Energy (signal processing); Control (management); Computer security; Distributed computing; Artificial intelligence; Physics","score_opus":0.019221710220685806,"score_gpt":0.22577662580230973,"score_spread":0.20655491558162392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392152135","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00059423456,0.000055494005,0.98614454,0.00011555131,0.0093247825,0.0009805638,0.00005856702,0.00097207836,0.0017541866],"genre_scores_gemma":[0.9859847,0.0000070235915,0.00061161676,0.000055796227,0.00024366747,0.0011737689,0.000024092793,0.00017859497,0.01172077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977446,0.000045915334,0.00045768224,0.0005133396,0.0006775244,0.0005609281],"domain_scores_gemma":[0.99907714,0.00014947378,0.00004991778,0.0003492065,0.00017915838,0.00019512522],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003002982,0.00045071027,0.00041711092,0.0003262447,0.00022399773,0.00022928201,0.00019847526,0.00012384636,0.000053762826],"category_scores_gemma":[0.000006966311,0.00042706786,0.00022553925,0.00039492876,0.000024671923,0.00030484152,0.0000018962754,0.00032555687,0.000052175936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013613848,0.000051525807,9.866491e-7,0.0001691789,0.0010806073,0.000020702108,0.0012135304,0.988869,0.0018577261,0.00040883664,0.005231111,0.0009606435],"study_design_scores_gemma":[0.001833518,0.00031359054,0.00000429301,0.00025149755,0.00021123899,0.000008836436,0.0005609945,0.88284063,0.0065642023,0.000001327467,0.10694835,0.000461537],"about_ca_topic_score_codex":0.0002506578,"about_ca_topic_score_gemma":0.000060181876,"teacher_disagreement_score":0.98553294,"about_ca_system_score_codex":0.00072213233,"about_ca_system_score_gemma":0.000041829506,"threshold_uncertainty_score":0.9998181},"labels":[],"label_agreement":null},{"id":"W4393171236","doi":"10.1109/tpwrs.2024.3381553","title":"A Decentralized Wide-Area Voltage Control Scheme for Coordinated Secondary Voltage Regulation Using PMUs","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Voltage; Voltage regulation; Scheme (mathematics); Control theory (sociology); Electric power system; Decentralised system; AC power; Control (management); Computer science; Automatic Generation Control; Engineering; Power (physics); Electrical engineering; Mathematics; Physics","score_opus":0.01329587302103359,"score_gpt":0.23279120262729036,"score_spread":0.21949532960625678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393171236","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022951482,0.0011497267,0.964068,0.000032149095,0.0071446137,0.001376198,0.001593039,0.0013401719,0.0003445997],"genre_scores_gemma":[0.99878967,0.000013449734,0.00032409202,0.000023286435,0.000025566169,0.00017803936,0.00008845622,0.00012494462,0.00043250542],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817765,0.000040217616,0.00058814534,0.0004206874,0.00025450753,0.0005187949],"domain_scores_gemma":[0.9990836,0.00020689052,0.000052489104,0.00035010983,0.00014874351,0.00015820721],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002930573,0.00037574995,0.00041238972,0.00029880725,0.00016686211,0.00027400744,0.00014055485,0.00027603793,0.00021886142],"category_scores_gemma":[0.000011381592,0.00040365948,0.00027235463,0.00047890138,0.000042690353,0.0005175903,7.6687877e-7,0.00035286645,0.0000981825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026764418,0.000116228344,0.000015931775,0.0010380624,0.0007830099,0.000033914683,0.0003206708,0.7657038,0.22253665,0.00042282065,0.007996259,0.00076499756],"study_design_scores_gemma":[0.0015985244,0.00012406749,0.000034203546,0.00040548158,0.00016191065,0.00004266306,0.000090171554,0.96256703,0.010923159,0.000027045864,0.023580417,0.0004453534],"about_ca_topic_score_codex":0.0000570503,"about_ca_topic_score_gemma":0.00001328852,"teacher_disagreement_score":0.9758382,"about_ca_system_score_codex":0.000610984,"about_ca_system_score_gemma":0.00008299185,"threshold_uncertainty_score":0.9998415},"labels":[],"label_agreement":null},{"id":"W4396853202","doi":"10.1109/tpwrs.2024.3400039","title":"A Novel Bi-Directional Grid Inverter Control Based on Virtual Impedance Using Neural Network for Dynamics Improvement in Microgrids","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Université du Québec à Trois-Rivières","funders":"Natural Sciences and Engineering Research Council of Canada; Hydro-Québec; Canada Foundation for Innovation; CMC Microsystems","keywords":"Artificial neural network; Inverter; Computer science; Electrical impedance; Grid; Control (management); Control engineering; Control theory (sociology); Electronic engineering; Engineering; Electrical engineering; Artificial intelligence; Voltage; Mathematics","score_opus":0.012056645251553368,"score_gpt":0.23262148200787527,"score_spread":0.2205648367563219,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396853202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015249804,0.00037450247,0.9469035,0.00014119982,0.03518633,0.00083859975,0.0006565982,0.00027035817,0.00037906907],"genre_scores_gemma":[0.99677503,0.0000062828058,0.00022180853,0.00036762032,0.00047785408,0.0005608825,0.000028259641,0.0001197522,0.0014425208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972787,0.00011921012,0.00079153734,0.0007122756,0.00040601584,0.0006922828],"domain_scores_gemma":[0.9988992,0.00032935452,0.000119918775,0.00040823783,0.00008931099,0.00015397],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046153998,0.00045227061,0.0005343588,0.0004478087,0.0002345213,0.00021402279,0.00020634076,0.0002860685,0.000031591786],"category_scores_gemma":[0.000004084414,0.00040019493,0.0003824687,0.0005780881,0.00005340911,0.00018681705,0.0000016229349,0.0003508933,0.000015398362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031640782,0.00026561122,0.000012305886,0.00011736169,0.00019327502,0.000015391897,0.00007337289,0.985107,0.010420233,0.00088167924,0.00058135414,0.0020159886],"study_design_scores_gemma":[0.0020898029,0.0006469258,0.000014755251,0.0006111324,0.00006206858,0.0000472772,0.000108909066,0.9817377,0.0010086738,0.000009038571,0.013226645,0.00043708438],"about_ca_topic_score_codex":0.0073893196,"about_ca_topic_score_gemma":0.0049316436,"teacher_disagreement_score":0.98152524,"about_ca_system_score_codex":0.0008683701,"about_ca_system_score_gemma":0.0002014842,"threshold_uncertainty_score":0.99984497},"labels":[],"label_agreement":null},{"id":"W4399146380","doi":"10.1109/tpwrs.2024.3406937","title":"A Complex Domain Gaussian Belief Propagation Method for Fully Distributed State Estimation","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Distributed Sensor Networks and Detection Algorithms","field":"Computer Science","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; National Natural Science Foundation of China","keywords":"Estimation; Computer science; Gaussian process; Gaussian; State (computer science); Mathematical optimization; Algorithm; Control theory (sociology); Mathematics; Artificial intelligence; Engineering; Control (management); Physics","score_opus":0.016881788555716638,"score_gpt":0.2768817106032595,"score_spread":0.25999992204754285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399146380","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000067131754,0.00008699676,0.9913564,0.000783779,0.0046552275,0.0010993686,0.00074179017,0.0009938377,0.00021547829],"genre_scores_gemma":[0.9078105,0.000005941963,0.09096902,0.000072604016,0.00003310361,0.00041445313,0.00008724306,0.000035809808,0.0005712974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997848,0.00018965478,0.00053666235,0.0006289989,0.00040304192,0.0003936633],"domain_scores_gemma":[0.99884456,0.00022991923,0.00011179566,0.000480027,0.00017066007,0.00016304664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059563876,0.0002672055,0.00027796967,0.00027161525,0.00037268395,0.00093806355,0.00031943255,0.00012079187,0.000023697707],"category_scores_gemma":[0.0000052648315,0.00024180446,0.00019621573,0.00096133334,0.000031878502,0.00054914935,0.000002478058,0.00023594711,0.000096533884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001086822,0.00033106678,2.7974644e-7,0.0003430514,0.0003161219,0.00004396347,0.0012128354,0.85196096,0.0025767917,0.020489406,0.00857408,0.11404279],"study_design_scores_gemma":[0.00039747683,0.000316234,0.000013141416,0.00012792512,0.000024079187,0.00009869551,0.00006643128,0.9673695,0.0014450962,0.0010513873,0.028810993,0.0002790538],"about_ca_topic_score_codex":0.00006370349,"about_ca_topic_score_gemma":0.00001726809,"teacher_disagreement_score":0.9077434,"about_ca_system_score_codex":0.00022748561,"about_ca_system_score_gemma":0.00009222217,"threshold_uncertainty_score":0.98605},"labels":[],"label_agreement":null},{"id":"W4399453034","doi":"10.1109/tpwrs.2024.3409729","title":"Machine-Learning-Reinforced Massively Parallel Transient Simulation for Large-Scale Renewable-Energy-Integrated Power Systems","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Real-time simulation and control systems","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada); RTDS Technologies (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Renewable energy; Massively parallel; Transient (computer programming); Electric power system; Computer science; Scale (ratio); Power system simulation; Transient analysis; Wind power; Power (physics); Electrical engineering; Engineering; Transient response; Parallel computing; Physics","score_opus":0.00892393831673308,"score_gpt":0.2221723492632285,"score_spread":0.21324841094649544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399453034","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00041180197,0.0017992217,0.97858965,0.00003796542,0.008406071,0.0016104615,0.00043854068,0.002009155,0.0066970997],"genre_scores_gemma":[0.97893745,0.000043703345,0.000061532955,0.000025038484,0.000051863008,0.00081465003,0.00011059721,0.00020357432,0.019751599],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99683255,0.00019163165,0.0011309775,0.00059852714,0.00055683125,0.000689481],"domain_scores_gemma":[0.99854344,0.00037325616,0.00011576786,0.0004625679,0.00023733194,0.0002676155],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047122117,0.0005962382,0.0006954702,0.0005328549,0.0003089403,0.0006280936,0.00022575683,0.0004146652,0.00015506748],"category_scores_gemma":[0.0000069345674,0.00054070895,0.00049505703,0.0005928246,0.00002327605,0.00047951724,9.933084e-7,0.00040777793,0.00015156885],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020241216,0.000039702692,0.0000019191334,0.00035873757,0.00040208103,0.000010464214,0.00083346776,0.9948105,0.0013887495,0.0005561203,0.0013079931,0.00008780779],"study_design_scores_gemma":[0.0017830649,0.00019927612,0.0000036148863,0.0004012087,0.000094635376,0.000019360146,0.00065506285,0.81693655,0.00019829918,0.000003466467,0.1792299,0.0004755595],"about_ca_topic_score_codex":0.00071140233,"about_ca_topic_score_gemma":0.000103287275,"teacher_disagreement_score":0.97852814,"about_ca_system_score_codex":0.00035608362,"about_ca_system_score_gemma":0.00007381731,"threshold_uncertainty_score":0.9997044},"labels":[],"label_agreement":null},{"id":"W4399563140","doi":"10.1109/tpwrs.2024.3413299","title":"Economic Power-Sharing and Stability Enhancement for Virtual Synchronous Generators in Islanded MG","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Khalifa University of Science, Technology and Research","keywords":"Electric power system; Stability (learning theory); Power (physics); Power sharing; Computer science; Control theory (sociology); Economic dispatch; Electricity generation; AC power; Control engineering; Engineering; Electrical engineering; Voltage; Control (management); Physics","score_opus":0.006704332475214535,"score_gpt":0.2032750730423484,"score_spread":0.19657074056713386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399563140","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24037297,0.0015100373,0.7537743,0.000018441795,0.003450524,0.0004809003,0.00007774859,0.00016745087,0.00014763771],"genre_scores_gemma":[0.9994268,0.00014987591,0.00007445913,0.000006168093,0.000023122462,0.00022876196,0.0000044764793,0.00003348722,0.000052853466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991438,0.000015747592,0.00030480596,0.00027791184,0.000055375112,0.00020240793],"domain_scores_gemma":[0.9997182,0.000043924174,0.000014227307,0.00016074746,0.00001220047,0.000050707018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001748655,0.00015710549,0.00019284757,0.00014174798,0.000051673953,0.00013212822,0.00006089693,0.00008209863,0.000077970646],"category_scores_gemma":[6.7686625e-7,0.0001597569,0.000058279227,0.00006983168,0.000013294002,0.00015093709,7.0183944e-7,0.00011348849,0.000023329769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056069388,0.000058741232,0.00004258827,0.00033111215,0.00018701333,0.000004316061,0.0016993746,0.9824198,0.01128949,0.00021226858,0.00017692328,0.0035222883],"study_design_scores_gemma":[0.0005997074,0.0001511426,0.00001516531,0.00011506768,0.00002353672,0.0000069602997,0.0002014226,0.986266,0.010963396,0.000011797265,0.0014126571,0.00023310776],"about_ca_topic_score_codex":0.000045569544,"about_ca_topic_score_gemma":0.00016589754,"teacher_disagreement_score":0.7590538,"about_ca_system_score_codex":0.0003028023,"about_ca_system_score_gemma":0.000026196796,"threshold_uncertainty_score":0.65146977},"labels":[],"label_agreement":null},{"id":"W4400411517","doi":"10.1109/tpwrs.2024.3424409","title":"Long-Term Carbon-Efficient Planning for Geographically Shiftable Resources: A Monte Carlo Tree Search Approach","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Distributed and Parallel Computing Systems","field":"Computer Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Guangzhou Municipal Science and Technology Project","keywords":"Monte Carlo method; Term (time); Computer science; Monte Carlo tree search; Tree (set theory); Mathematical optimization; Operations research; Mathematics; Statistics; Physics","score_opus":0.024574615590030734,"score_gpt":0.2629607111924069,"score_spread":0.23838609560237614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400411517","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06087634,0.0019913013,0.9283933,0.00009949718,0.004430942,0.0010965345,0.00008915151,0.00092569605,0.002097251],"genre_scores_gemma":[0.9972797,0.0000040219657,0.0007418513,0.000021268881,0.000085121945,0.0003326167,0.000005609172,0.000051158087,0.0014786624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965478,0.00022103556,0.0006273178,0.0010558967,0.00074712426,0.0008008119],"domain_scores_gemma":[0.9982508,0.00033936504,0.000080311554,0.0009189869,0.00014924713,0.00026132344],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0010252767,0.00038817746,0.00046673432,0.00056820275,0.00038647495,0.001266071,0.001083726,0.00022335598,0.0000021585581],"category_scores_gemma":[0.0000035382998,0.00034437407,0.00037222047,0.0011904336,0.000066548666,0.00016765075,0.000009779427,0.00048738593,0.00002047726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048370293,0.00029660657,0.00012548816,0.00070199696,0.0002924822,0.00008275932,0.0061850054,0.9902124,0.00014651725,0.0008442997,0.00037029292,0.00069381186],"study_design_scores_gemma":[0.00047891316,0.00031156713,0.0002035895,0.00082350994,0.000041120176,0.00014334041,0.00022871234,0.994336,0.00006290298,0.0000055656355,0.002923614,0.00044113834],"about_ca_topic_score_codex":0.00030855095,"about_ca_topic_score_gemma":0.000008964658,"teacher_disagreement_score":0.93640333,"about_ca_system_score_codex":0.0001446751,"about_ca_system_score_gemma":0.0001410597,"threshold_uncertainty_score":0.9999008},"labels":[],"label_agreement":null},{"id":"W4405219103","doi":"10.1109/tpwrs.2024.3514827","title":"Towards Resilient Self-Proactive Distribution Grids Against Wildfires: A Dual Rolling Horizon-Based Framework","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Fire effects on ecosystems","field":"Environmental Science","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Dual (grammatical number); Horizon; Computer science; Distribution (mathematics); Mathematical optimization; Distributed computing; Mathematics; Geometry","score_opus":0.006304305436030602,"score_gpt":0.22164114107456703,"score_spread":0.21533683563853642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405219103","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25227964,0.0002640321,0.7341737,0.0002496357,0.008723206,0.0012936512,0.00042871616,0.0009816546,0.0016057458],"genre_scores_gemma":[0.9987442,0.000022072074,0.00030157177,0.000071920236,0.000090155205,0.0004706406,0.00002710765,0.00008780204,0.00018451203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963624,0.00036828732,0.0006050515,0.0009758629,0.00103465,0.0006537454],"domain_scores_gemma":[0.99847573,0.00041175372,0.00011205634,0.00068948837,0.000027059237,0.000283898],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00076966983,0.00047896095,0.00041970127,0.0001519051,0.00041601385,0.00033996016,0.00029917384,0.0003750927,0.0002159169],"category_scores_gemma":[0.000021515452,0.00043570244,0.00030636194,0.0009929617,0.000117503085,0.00042043385,0.000004803252,0.0007697323,0.0018739365],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010372736,0.0038663745,0.0008555176,0.0017570922,0.0020037706,0.0010579956,0.010024962,0.90945876,0.015486923,0.0009874643,0.017554993,0.035908874],"study_design_scores_gemma":[0.0013539654,0.0025401195,0.0015820842,0.0029648645,0.00037283328,0.00012078866,0.0010081141,0.89961016,0.031160636,0.000088349145,0.057117313,0.0020807916],"about_ca_topic_score_codex":0.0011947541,"about_ca_topic_score_gemma":0.000058052894,"teacher_disagreement_score":0.74646455,"about_ca_system_score_codex":0.0019333158,"about_ca_system_score_gemma":0.00011203953,"threshold_uncertainty_score":0.9998095},"labels":[],"label_agreement":null},{"id":"W4405936040","doi":"10.1109/tpwrs.2024.3524323","title":"State Estimation for Integrated Energy Systems: Motivations, Advances, and Future Work","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Integrated Energy Systems Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Engineering and Physical Sciences Research Council","keywords":"Estimation; Work (physics); Electric power system; State (computer science); Computer science; Industrial engineering; Risk analysis (engineering); Engineering; Control engineering; Systems engineering; Reliability engineering; Power (physics); Business; Mechanical engineering","score_opus":0.004500166635245156,"score_gpt":0.19886310430271567,"score_spread":0.1943629376674705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405936040","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00035107642,0.012213658,0.97179013,0.00004151822,0.012849955,0.0005464903,0.00025276165,0.0013216941,0.0006326995],"genre_scores_gemma":[0.99466246,0.0009574539,0.0010396885,0.000010737356,0.000084123414,0.0008353037,0.00008481025,0.00013436824,0.0021910733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99852985,0.000074138305,0.00054856343,0.00035038756,0.00020728994,0.00028979586],"domain_scores_gemma":[0.9992837,0.00013766534,0.000052067484,0.00025835616,0.00017208132,0.00009614142],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018709316,0.00033812056,0.00030772906,0.00045365124,0.0001496407,0.00035998534,0.000097713855,0.00022051648,0.000011274194],"category_scores_gemma":[0.0000034583713,0.00030597713,0.000080381156,0.0007665683,0.000026688238,0.0005602149,4.6049897e-7,0.00022359782,0.000018834338],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022374477,0.000015962227,8.467453e-7,0.00059105124,0.00015749504,0.0000032791543,0.0003216344,0.9896619,0.0001013897,0.0014812638,0.0020335803,0.0056092367],"study_design_scores_gemma":[0.0002072347,0.000057872992,0.0000015649448,0.000784197,0.000040785664,0.00003279273,0.00042439307,0.8464348,0.00070323236,0.000017255998,0.1510026,0.00029327255],"about_ca_topic_score_codex":0.00012742862,"about_ca_topic_score_gemma":0.000029956267,"teacher_disagreement_score":0.9943114,"about_ca_system_score_codex":0.00031336307,"about_ca_system_score_gemma":0.000044733242,"threshold_uncertainty_score":0.99993926},"labels":[],"label_agreement":null},{"id":"W4406354569","doi":"10.1109/tpwrs.2025.3528864","title":"Generation Planning and Operation Under Power Stability Constraints: A Hydro-Quebec Use Case","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electric Power System Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Electric power system; Stability (learning theory); Electricity generation; Power (physics); Control theory (sociology); Computer science; Engineering; Operations research; Reliability engineering; Control engineering; Mathematical optimization; Mathematics; Control (management)","score_opus":0.02629836294089091,"score_gpt":0.24203929074780411,"score_spread":0.2157409278069132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406354569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14977422,0.0003146588,0.84513074,0.000035864712,0.0026014175,0.0006903137,0.000047083588,0.00038739163,0.0010183258],"genre_scores_gemma":[0.99901235,0.000012261743,0.00023686218,0.00005787245,0.000012311683,0.00012774362,0.000010912274,0.000039362985,0.00049034937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984267,0.00016988069,0.00054668525,0.00038353584,0.00019146771,0.00028175442],"domain_scores_gemma":[0.9992109,0.00014663424,0.000052574218,0.00038029614,0.000112660724,0.000096957985],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030427164,0.00028126387,0.00028991196,0.00033102086,0.00025960724,0.00035679404,0.00007005889,0.0002230088,0.000057835157],"category_scores_gemma":[0.000009615608,0.00029777244,0.000059882757,0.00038108422,0.0000643138,0.0006373198,0.0000011154483,0.00026289013,0.00001402265],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018404004,0.00007070729,0.0000945834,0.00010578199,0.00018451978,0.00006535347,0.0012583338,0.9882116,0.0085833,0.000504959,0.0006313149,0.00027115853],"study_design_scores_gemma":[0.0012528863,0.00013014486,0.00015206778,0.0003041192,0.00010011115,0.0009034689,0.0015605339,0.9757417,0.018423129,0.0000062329223,0.00077496195,0.0006506313],"about_ca_topic_score_codex":0.0007256769,"about_ca_topic_score_gemma":0.00065512134,"teacher_disagreement_score":0.8492381,"about_ca_system_score_codex":0.0004507915,"about_ca_system_score_gemma":0.00008434886,"threshold_uncertainty_score":0.9999474},"labels":[],"label_agreement":null},{"id":"W4406948175","doi":"10.1109/tpwrs.2025.3534437","title":"Voltage Collapse Owing to Cascading Failures Under Geomagnetic Disturbances in Electromagnetic Transient Perspective","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Electrical Fault Detection and Protection","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"National Natural Science Foundation of China","keywords":"Transient (computer programming); Voltage; Ground; Electric power system; Transient analysis; Engineering; Control theory (sociology); Electrical engineering; Physics; Computer science; Power (physics); Transient response; Control (management)","score_opus":0.005276891658893636,"score_gpt":0.22901714057511346,"score_spread":0.22374024891621982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406948175","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09532252,0.0012991504,0.8932228,0.0003328795,0.0025802029,0.0010365264,0.000011358872,0.00046900133,0.005725542],"genre_scores_gemma":[0.9976823,0.000036651993,0.000045453235,0.000089113724,0.000014218543,0.00038512814,4.1366067e-7,0.000034013112,0.0017127101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998518,0.00008521138,0.00037164445,0.00037574142,0.00022166152,0.0004277491],"domain_scores_gemma":[0.99947196,0.000113386595,0.000020061245,0.00022177491,0.00006552858,0.00010731273],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001565122,0.00026188954,0.00029454005,0.0007733747,0.00017510442,0.0001081463,0.00013104427,0.00015484229,0.000046481513],"category_scores_gemma":[0.000007734813,0.0002722126,0.00011398167,0.0017009553,0.000022503971,0.000116789684,6.0836715e-7,0.000462235,0.000044179975],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019741501,0.00018030377,0.000009236473,0.00020058986,0.00017727206,0.000022306805,0.0026275667,0.8425468,0.14913248,0.00094044383,0.00077966036,0.0031859004],"study_design_scores_gemma":[0.009741255,0.007925035,0.0057763276,0.003368546,0.0005623081,0.0003335194,0.023864863,0.39925745,0.4562014,0.0015075594,0.08604343,0.005418297],"about_ca_topic_score_codex":0.00084853044,"about_ca_topic_score_gemma":0.0009497583,"teacher_disagreement_score":0.9023598,"about_ca_system_score_codex":0.0008301275,"about_ca_system_score_gemma":0.000035995236,"threshold_uncertainty_score":0.999973},"labels":[],"label_agreement":null},{"id":"W4406948271","doi":"10.1109/tpwrs.2025.3535863","title":"Interharmonic Power–A New Concept for Power System Oscillation Source Location","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems and Technologies","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro One (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Electric power system; Oscillation (cell signaling); Power (physics); Computer science; Engineering; Electronic engineering; Electrical engineering; Physics","score_opus":0.00916806219983402,"score_gpt":0.21772035927729028,"score_spread":0.20855229707745626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406948271","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046289572,0.0018853119,0.9714432,0.000114656345,0.013042054,0.001326441,0.000061537256,0.0025180087,0.0049798465],"genre_scores_gemma":[0.9945438,0.00001149958,0.00014479455,0.000027155753,0.000023811235,0.00029928106,0.0000055099554,0.00007219048,0.0048719877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.998115,0.000047639398,0.00071239634,0.00043185923,0.00024861124,0.00044448767],"domain_scores_gemma":[0.9988006,0.00013945645,0.000111364294,0.000676737,0.00016779607,0.00010406048],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022516678,0.0003818172,0.00047904096,0.0005106684,0.00020183629,0.00016862992,0.00033470278,0.0003753913,0.000023524199],"category_scores_gemma":[0.000011033639,0.00038075502,0.00020516964,0.00063692144,0.00004931623,0.00024473658,0.000002552546,0.00028692116,0.00009764466],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024646215,0.0002573046,0.00006690585,0.002636449,0.001892985,0.000011951217,0.005744711,0.85238034,0.010367654,0.024289591,0.09358259,0.008523066],"study_design_scores_gemma":[0.0067797555,0.001369797,0.00028301976,0.0068676695,0.0004632214,0.00017841088,0.022082703,0.25904304,0.07017327,0.00016256254,0.6295942,0.003002308],"about_ca_topic_score_codex":0.00013783596,"about_ca_topic_score_gemma":0.000024132358,"teacher_disagreement_score":0.98991483,"about_ca_system_score_codex":0.00059311156,"about_ca_system_score_gemma":0.000095357864,"threshold_uncertainty_score":0.99986446},"labels":[],"label_agreement":null},{"id":"W4406948641","doi":"10.1109/tpwrs.2025.3535727","title":"A Novel Clustering Method for Extracting Representative Photovoltaic Scenarios Considering Power, Energy, and Variability","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Photovoltaic System Optimization Techniques","field":"Energy","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"National Natural Science Foundation of China","keywords":"Photovoltaic system; Cluster analysis; Computer science; Energy (signal processing); Power (physics); Electric power system; Reliability engineering; Engineering; Data mining; Electrical engineering; Artificial intelligence; Mathematics; Statistics; Physics","score_opus":0.022492047404836353,"score_gpt":0.3044394886243561,"score_spread":0.28194744121951976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406948641","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005530628,0.00010714082,0.9880901,0.000056597528,0.002128267,0.0013473041,0.00009549464,0.00067200436,0.0069500534],"genre_scores_gemma":[0.9365249,0.000018651586,0.060083535,0.0001825469,0.000013698904,0.0014102923,0.000004446716,0.000073114796,0.0016887827],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99693644,0.00040593382,0.0009773123,0.00092610385,0.0002871195,0.00046711773],"domain_scores_gemma":[0.99655885,0.0018899251,0.00031801718,0.00075486576,0.00033763936,0.00014071264],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0013719379,0.000423551,0.00067367876,0.0004862566,0.00046461806,0.00021163316,0.00022545354,0.000311268,0.000049011618],"category_scores_gemma":[0.0001599416,0.00044775946,0.0002060043,0.0005270289,0.00010549982,0.0003442873,0.000009694712,0.000253572,0.000002051551],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006898935,0.0006955795,0.00007434427,0.0008100793,0.0011465393,0.00001483343,0.0037778083,0.27503067,0.7059105,0.008144346,0.0010996498,0.0026057719],"study_design_scores_gemma":[0.0022771868,0.00020593278,0.000023773453,0.0009098276,0.00017383126,0.00019435186,0.002863874,0.58542055,0.39226225,0.00045813975,0.014444136,0.0007661592],"about_ca_topic_score_codex":0.00844305,"about_ca_topic_score_gemma":0.00073030224,"teacher_disagreement_score":0.93597186,"about_ca_system_score_codex":0.00035772967,"about_ca_system_score_gemma":0.00013903147,"threshold_uncertainty_score":0.9997974},"labels":[],"label_agreement":null},{"id":"W4407097829","doi":"10.1109/tpwrs.2025.3535665","title":"Root Cause Analysis of Frequency Oscillations Observed in Ontario's Distribution System","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power Systems and Technologies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Electric power system; Physics; Control theory (sociology); Mathematics; Power (physics); Computer science","score_opus":0.0164524856207184,"score_gpt":0.21397390879324452,"score_spread":0.1975214231725261,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407097829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33936003,0.00029219908,0.65381014,0.000013474265,0.0025608423,0.0003633362,0.00023988102,0.0005287202,0.002831374],"genre_scores_gemma":[0.99936485,0.0000061728624,0.000029723733,0.0000013193511,0.0000018045519,0.00014777735,0.000023405006,0.0000152213,0.00040969742],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99844897,0.000055192053,0.00075483223,0.00025816608,0.00021958412,0.00026323585],"domain_scores_gemma":[0.99911225,0.00007960677,0.00008323431,0.0005947819,0.0000880498,0.00004206974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022243513,0.00022039426,0.000582029,0.00096297037,0.000078438956,0.000046111625,0.00022521112,0.00024192825,0.000019893698],"category_scores_gemma":[0.000004720395,0.00022141673,0.00022055788,0.0021861657,0.000035005905,0.00014159038,0.0000014623209,0.00028696016,0.000009041903],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019606152,0.00018278687,0.032221645,0.00053798826,0.003686813,0.000023336977,0.0007199674,0.94888836,0.002437245,0.010802511,0.0003628305,0.000116925046],"study_design_scores_gemma":[0.003566242,0.00038934904,0.51616347,0.0047416887,0.005278261,0.000036227673,0.006079795,0.43237075,0.018614784,0.00011354572,0.010212571,0.0024333007],"about_ca_topic_score_codex":0.041518763,"about_ca_topic_score_gemma":0.19794905,"teacher_disagreement_score":0.66000485,"about_ca_system_score_codex":0.0011339391,"about_ca_system_score_gemma":0.000073388444,"threshold_uncertainty_score":0.96486384},"labels":[],"label_agreement":null},{"id":"W4408935432","doi":"10.1109/tpwrs.2025.3555858","title":"Adaptive Dynamic State Estimation in Power Systems With Real-Time Y-Bus Matrix Estimation: A Step Toward Greater Practicality","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Lakehead University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Estimation; Electric power system; Computer science; State (computer science); Control theory (sociology); Matrix (chemical analysis); Power (physics); Estimation theory; Control engineering; Engineering; Algorithm; Control (management); Artificial intelligence","score_opus":0.008196888913408215,"score_gpt":0.24593465418388058,"score_spread":0.23773776527047236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408935432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008848329,0.00013272077,0.97942877,0.00009576758,0.002282958,0.001889565,0.00021946186,0.0008118511,0.006290556],"genre_scores_gemma":[0.9951293,0.000017662338,0.0023364583,0.000011666705,0.000001305369,0.00047238157,0.0000171062,0.000070652895,0.0019435015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968266,0.00041029698,0.0011074836,0.00061081187,0.0005293872,0.00051542267],"domain_scores_gemma":[0.9983992,0.00024229249,0.00017195739,0.00077207066,0.00024353112,0.00017095478],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00070935045,0.0005092908,0.0007396146,0.0005759727,0.00014588484,0.00028086916,0.00022454048,0.0002600741,0.00008971611],"category_scores_gemma":[0.000015414613,0.00046473468,0.00011986042,0.0009945224,0.00008067761,0.0006500661,0.0000028291568,0.0004294385,0.00019906445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025815913,0.0001483856,0.00005628927,0.00042226163,0.00021156837,0.000024768908,0.0012325776,0.99717945,0.000055273365,0.00016394819,0.00018184,0.00006548992],"study_design_scores_gemma":[0.00110286,0.00018122378,0.00051103585,0.0006895459,0.00007078486,0.000051771283,0.0008022797,0.9958401,0.00009409843,0.000010671316,0.00019137593,0.0004542537],"about_ca_topic_score_codex":0.00046686584,"about_ca_topic_score_gemma":0.00008872103,"teacher_disagreement_score":0.9862809,"about_ca_system_score_codex":0.0010587231,"about_ca_system_score_gemma":0.00015823677,"threshold_uncertainty_score":0.9997804},"labels":[],"label_agreement":null},{"id":"W4412082226","doi":"10.1109/tpwrs.2025.3586542","title":"Two-Stage Resilience-Oriented Unit Commitment of Transmission Systems Against Severe Windstorms","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Optimal Power Flow Distribution","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Power system simulation; Resilience (materials science); Stage (stratigraphy); Unit (ring theory); Psychological resilience; Transmission (telecommunications); Electric power system; Computer science; Environmental science; Power (physics); Geology; Psychology; Physics; Telecommunications; Social psychology","score_opus":0.008811443601338502,"score_gpt":0.2359647516816369,"score_spread":0.22715330808029838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412082226","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07260024,0.00077218306,0.9064632,0.00002646757,0.005841628,0.0009851188,0.00053394545,0.00049353373,0.012283694],"genre_scores_gemma":[0.9970543,0.00006766134,0.000080632555,0.000012840157,0.000010464431,0.00011886025,0.000032521635,0.000043514334,0.002579199],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979025,0.000118769574,0.0007788252,0.000343867,0.00045188062,0.00040414877],"domain_scores_gemma":[0.9988873,0.00008689636,0.00009312726,0.0006225756,0.0001588635,0.00015125317],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002879663,0.0003574277,0.0004829178,0.00038310376,0.00017542114,0.000056952194,0.00027543464,0.00021198909,0.000036232603],"category_scores_gemma":[0.0000029727914,0.0003447899,0.00017918882,0.0008127344,0.00007197658,0.0002334864,0.0000016122198,0.00038281427,0.000045001572],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009290069,0.00020665758,0.000068675494,0.00063992426,0.00020397847,0.000009200203,0.0003234127,0.98582125,0.010327949,0.0007758087,0.0010948221,0.0004354019],"study_design_scores_gemma":[0.0060244347,0.0007885201,0.00042525184,0.0046841563,0.00030348412,0.000037168298,0.00612359,0.74774325,0.07432028,0.000007812674,0.15794653,0.0015955081],"about_ca_topic_score_codex":0.00019600181,"about_ca_topic_score_gemma":0.000017143504,"teacher_disagreement_score":0.9244541,"about_ca_system_score_codex":0.00041294147,"about_ca_system_score_gemma":0.00007646686,"threshold_uncertainty_score":0.9999004},"labels":[],"label_agreement":null},{"id":"W4413319122","doi":"10.1109/tpwrs.2025.3600275","title":"Determining Disturbance Recovery Conditions by Inverse Sensitivity Minimization","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Fault Detection and Control Systems","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Science Foundation","keywords":"Disturbance (geology); Minification; Sensitivity (control systems); Control theory (sociology); Inverse; Inverse problem; Mathematics; Computer science; Mathematical optimization; Engineering; Geology; Control (management); Electronic engineering","score_opus":0.005151093237693262,"score_gpt":0.20650213972350498,"score_spread":0.20135104648581173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413319122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027733266,0.00014429845,0.9550484,0.000047393398,0.008738099,0.00041022332,0.0002460882,0.0007024952,0.0069297627],"genre_scores_gemma":[0.9948747,0.00002448182,0.00001943943,0.00009413699,0.000014643278,0.00017487387,0.000010401701,0.000030405832,0.0047569294],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988751,0.00012031922,0.0003657814,0.00025022094,0.00015787309,0.0002307257],"domain_scores_gemma":[0.99938434,0.00014263556,0.00004849419,0.00029653576,0.000051889365,0.00007612356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013230073,0.00021291302,0.0002672462,0.00021742914,0.00022361036,0.000100176956,0.00006902161,0.00015718503,0.000028635382],"category_scores_gemma":[0.000006457731,0.00023520541,0.00011990217,0.00037066708,0.00003498862,0.00022166387,4.972862e-7,0.00021214726,0.00009855816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050604613,0.00012635885,0.00006586901,0.0002668197,0.00037150065,0.000017774551,0.00031261353,0.9066763,0.03885796,0.0000688912,0.051389072,0.001796253],"study_design_scores_gemma":[0.0013601726,0.000107337764,0.00016741177,0.00046827714,0.00010649042,0.00005390917,0.00069498026,0.9276286,0.01662566,0.000011631161,0.0521607,0.00061484793],"about_ca_topic_score_codex":0.00006502615,"about_ca_topic_score_gemma":0.00008960108,"teacher_disagreement_score":0.96714145,"about_ca_system_score_codex":0.00020801916,"about_ca_system_score_gemma":0.00002414681,"threshold_uncertainty_score":0.9591398},"labels":[],"label_agreement":null},{"id":"W4413472561","doi":"10.1109/tpwrs.2025.3599746","title":"A Decomposition Matheuristic for the Transient Stability Constrained Unit Commitment at Hydro-Quebec","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Hydro-Québec; Polytechnique Montréal","funders":"Mitacs","keywords":"Power system simulation; Transient (computer programming); Decomposition; Stability (learning theory); Unit (ring theory); Benders' decomposition; Electric power system; Computer science; Control theory (sociology); Engineering; Mathematical optimization; Mathematics; Power (physics); Physics; Chemistry; Artificial intelligence","score_opus":0.016052192704732737,"score_gpt":0.24904362037057134,"score_spread":0.2329914276658386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413472561","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008255289,0.0003296732,0.9798184,0.0003523556,0.0042767436,0.0024054798,0.0004152129,0.0004268787,0.0037199387],"genre_scores_gemma":[0.9978703,0.00002125558,0.00012180285,0.000048495618,0.0000047484878,0.0007890013,0.000013033082,0.000027772234,0.0011035469],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984406,0.00018862943,0.0005628189,0.00027864723,0.00021589492,0.00031336994],"domain_scores_gemma":[0.9984741,0.0006657292,0.000046966412,0.00058747275,0.00012448413,0.00010123106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000556427,0.0002468793,0.00031231844,0.00012929879,0.00052393967,0.000107653956,0.00020095981,0.00013342695,0.00015044311],"category_scores_gemma":[0.0000076121,0.00020717537,0.00020485204,0.00024267404,0.000117705364,0.00008259745,0.0000010249048,0.00016976956,0.00002138393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031000786,0.0005108442,0.000051051844,0.00096334395,0.0006476714,0.0000030552392,0.003560954,0.98646736,0.001693005,0.0029820097,0.0021945226,0.0006161492],"study_design_scores_gemma":[0.0031651347,0.00016439342,0.0005295436,0.00040938842,0.00036872923,0.000021365102,0.0025780897,0.8723429,0.0073976316,0.000041281837,0.11226942,0.00071216305],"about_ca_topic_score_codex":0.00036914722,"about_ca_topic_score_gemma":0.0028411706,"teacher_disagreement_score":0.9896151,"about_ca_system_score_codex":0.0006947819,"about_ca_system_score_gemma":0.00009170343,"threshold_uncertainty_score":0.84483665},"labels":[],"label_agreement":null},{"id":"W4413785789","doi":"10.1109/tpwrs.2025.3600646","title":"A Data-Driven Forced Oscillation Locating Method for Power Systems With Inverter-Based Resources","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Power System Optimization and Stability","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Electric power system; Inverter; Forced oscillation; Oscillation (cell signaling); Computer science; Control theory (sociology); Control engineering; Power (physics); Electronic engineering; Engineering; Electrical engineering; Voltage; Physics; Control (management); Electrical impedance; Artificial intelligence","score_opus":0.021676176756206485,"score_gpt":0.2666286105639939,"score_spread":0.24495243380778742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413785789","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011829372,0.00021443353,0.9881827,0.000062405816,0.003489623,0.0018685343,0.00063498894,0.000747836,0.003616523],"genre_scores_gemma":[0.9940243,0.0000019573238,0.0045216614,0.000055449305,0.000007597155,0.0004887232,0.000049456565,0.00007182688,0.00077906105],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976384,0.00024463952,0.000764744,0.00060249644,0.00035594305,0.00039374974],"domain_scores_gemma":[0.9978402,0.00043473093,0.00013618705,0.0012151176,0.00024713832,0.00012658999],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007637909,0.0003674843,0.0005518649,0.00041068054,0.00028267197,0.000255923,0.00042482544,0.00021833781,0.000020719739],"category_scores_gemma":[0.000015212291,0.000327809,0.000110477784,0.0006659865,0.000041066698,0.00031065271,0.0000026498074,0.00022160223,0.0000137258085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009659299,0.000053333504,0.000050399565,0.00066043995,0.00021379531,0.0000010890448,0.00043010688,0.9969073,0.00028501602,0.00013996201,0.0010959253,0.000066049215],"study_design_scores_gemma":[0.0011288672,0.00015642725,0.000025719844,0.00055940356,0.00009172403,0.000007877066,0.001116775,0.9811089,0.00033196944,0.0000015022855,0.015131762,0.00033907278],"about_ca_topic_score_codex":0.00015923838,"about_ca_topic_score_gemma":0.00015737386,"teacher_disagreement_score":0.9928413,"about_ca_system_score_codex":0.00028494117,"about_ca_system_score_gemma":0.00010865925,"threshold_uncertainty_score":0.9999174},"labels":[],"label_agreement":null},{"id":"W7117325879","doi":"10.1109/tpwrs.2025.3648770","title":"Graph Deviation Network With Physics-Informed Detection and Robust $H_{\\infty }$ Control for Cyberattack Resilience in Wind-Integrated Power Grids","year":2025,"lang":"","type":"article","venue":"IEEE Transactions on Power Systems","topic":"Smart Grid Security and Resilience","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Robustness (evolution); Software deployment; Electric power system; Resilience (materials science); Grid; Power-system protection; Wireless sensor network; Smart grid; Drone","score_opus":0.006776812796101913,"score_gpt":0.21297203800610134,"score_spread":0.20619522520999944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117325879","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0622725,0.0010309468,0.9250023,0.00008048033,0.0078863595,0.0028648889,0.00012617421,0.00020680654,0.0005295632],"genre_scores_gemma":[0.99857044,0.00023898967,0.00019582914,0.00008457976,0.000079032216,0.00042418297,0.0000063739494,0.0000617112,0.00033883125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99663806,0.00019635302,0.0010462849,0.0007897936,0.0004203825,0.00090913556],"domain_scores_gemma":[0.99809575,0.0006336642,0.00021122087,0.0005399815,0.00032853664,0.00019082356],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00057105836,0.0006862825,0.0008210916,0.00051063247,0.0006706344,0.00033395225,0.00025854402,0.0005382787,0.000014723052],"category_scores_gemma":[0.000022837963,0.0006376396,0.00020733409,0.0021334407,0.00022930032,0.00080838485,0.0000019732659,0.0008972637,0.000011285616],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010476718,0.00017681695,0.00044362235,0.00050601526,0.00031556003,0.000005995295,0.0012305018,0.99435693,0.0006916761,0.0002938514,0.00022143846,0.0007099396],"study_design_scores_gemma":[0.009491371,0.0017995148,0.0057320744,0.005126463,0.00048157666,0.000058324575,0.0032114263,0.9630052,0.00648618,0.00010781012,0.002870828,0.001629258],"about_ca_topic_score_codex":0.0003583884,"about_ca_topic_score_gemma":0.0021173374,"teacher_disagreement_score":0.93629795,"about_ca_system_score_codex":0.00054523395,"about_ca_system_score_gemma":0.00031115103,"threshold_uncertainty_score":0.9996075},"labels":[],"label_agreement":null}]}