{"meta":{"query_hash":"ace4a18197f1","filters":{"venue":"INTEK Jurnal Penelitian"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/ace4a18197f1","api":"https://metacan.xera.ac/api/v1/cohort?venue=INTEK+Jurnal+Penelitian"},"results":[{"id":"W3207413166","doi":"10.31963/intek.v8i2.2962","title":"Hybrid Electrical System Optimization of Remote Island using HOMER","year":2021,"lang":"en","type":"article","venue":"INTEK Jurnal Penelitian","topic":"Hybrid Renewable Energy Systems","field":"Energy","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Positive Living North","funders":"","keywords":"Cost of electricity by source; Capital cost; Renewable energy; Intermittency; Net present value; Reliability (semiconductor); Electricity; Environmental science; Environmental economics; Automotive engineering; Operating cost; Hybrid system; Electricity generation; Reliability engineering; Business; Computer science; Power (physics); Engineering; Electrical engineering; Production (economics); Meteorology; Economics; Waste management; Geography","score_opus":0.015337474947256378,"score_gpt":0.2400155090497145,"score_spread":0.22467803410245812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3207413166","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70390725,0.0009967145,0.22628824,0.00041320128,0.000079095924,0.00024213288,0.00039124844,0.001245962,0.06643609],"genre_scores_gemma":[0.98642427,0.000104908904,0.008767909,0.000021551841,0.0000045713814,0.000065130786,0.00010165463,0.000032446707,0.0044776117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998797,0.000037248137,0.0000046453524,0.000023000759,0.000033610864,0.00002174016],"domain_scores_gemma":[0.9998642,0.000060228336,0.000019084302,0.000011300715,0.00003445809,0.000010692397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002699773,0.0005543858,0.0008342977,0.00044510936,0.0003437923,0.0009945963,0.00048243982,0.0005044754,0.0053506456],"category_scores_gemma":[0.0003518097,0.00025442938,0.00052004465,0.0003533901,0.00023882184,0.0003875973,0.00047081904,0.00044843418,0.000451506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000109175046,0.00007505538,0.0008197794,0.00010145825,0.000049727136,0.00016978523,0.000032590713,0.977999,0.0051430645,0.000864007,0.00051698944,0.014119385],"study_design_scores_gemma":[0.00002190101,0.00019346966,0.0007541789,0.000006862451,0.000024237399,0.000029607716,0.000033094653,0.99663395,0.0010288614,0.00046170625,0.0008052431,0.000006969057],"about_ca_topic_score_codex":0.004318955,"about_ca_topic_score_gemma":0.006400263,"teacher_disagreement_score":0.0053506456,"about_ca_system_score_codex":0.0004757427,"about_ca_system_score_gemma":0.00035527584,"threshold_uncertainty_score":0.017899692},"labels":[],"label_agreement":null},{"id":"W4312335683","doi":"10.31963/intek.v9i1.3789","title":"PVSYST-Based Solar Power Plant Planning","year":2022,"lang":"en","type":"article","venue":"INTEK Jurnal Penelitian","topic":"Engineering and Technology Innovations","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sizing; Software; Grid; Photovoltaic system; Electricity; Computer science; Controller (irrigation); Engineering; Automotive engineering; Electrical engineering; Operating system","score_opus":0.009410146401532782,"score_gpt":0.20430153737935722,"score_spread":0.19489139097782443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312335683","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22793502,0.0005060323,0.6570588,0.0003814021,0.000092111746,0.00050655036,0.007967751,0.013464326,0.09208793],"genre_scores_gemma":[0.82237417,0.00022383242,0.16411471,0.00003116347,0.000013317643,0.00022137792,0.0039239726,0.00035413896,0.00874318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998331,0.000035317968,0.000008856639,0.000041117746,0.00006413202,0.000017440763],"domain_scores_gemma":[0.9997656,0.000071621376,0.000026335723,0.000025242038,0.00008719502,0.000023949353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002281168,0.0004573268,0.0003871547,0.0007331595,0.0003094371,0.00061297306,0.00058640895,0.0003140973,0.009892299],"category_scores_gemma":[0.0006592014,0.00037885833,0.00036175022,0.00083187176,0.00011970297,0.0005452187,0.00035655824,0.00032505198,0.0014290267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008256912,0.00005143091,0.004432755,0.00014405405,0.000020946422,0.00013043558,0.00005260574,0.89264554,0.0023552896,0.0021328046,0.00567384,0.09227781],"study_design_scores_gemma":[0.000013998476,0.000031728105,0.0013662509,0.000012574028,0.000009012808,0.00003176677,0.000047290436,0.99141335,0.0019824263,0.0011246136,0.003955441,0.000011577862],"about_ca_topic_score_codex":0.011337856,"about_ca_topic_score_gemma":0.01922966,"teacher_disagreement_score":0.011337856,"about_ca_system_score_codex":0.0005409964,"about_ca_system_score_gemma":0.0009709991,"threshold_uncertainty_score":0.033092976},"labels":[],"label_agreement":null}]}