{"meta":{"query_hash":"e20886d73165","filters":{"venue":"ISRM International Symposium"},"cohort_total":20,"direct_labels_cover":0,"predictions_cover":20,"exported":20,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/e20886d73165","api":"https://metacan.xera.ac/api/v1/cohort?venue=ISRM+International+Symposium"},"results":[{"id":"W1014830101","doi":"","title":"Underground Works In Hard Rock Tunnelling And Mining","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Tunneling and Rock Mechanics","field":"Engineering","cited_by":136,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Laurentian University","funders":"","keywords":"Mining engineering; Geology; Underground mining (soft rock); Forensic engineering; Coal mining; Engineering; Archaeology; History","score_opus":0.00828752421542974,"score_gpt":0.20354086478952818,"score_spread":0.19525334057409843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1014830101","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7314967,0.013251845,0.00074025505,0.010926321,0.0005355976,0.00003366044,0.0003783968,0.000029412658,0.24260785],"genre_scores_gemma":[0.92752105,0.0042828703,0.00021034344,0.00027363014,0.00020925023,0.000013720981,0.00011207195,0.00002286504,0.06735427],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991309,0.00037918548,0.00003353947,0.000055803375,0.00012670393,0.00027377004],"domain_scores_gemma":[0.9990501,0.00030355158,0.00015890312,0.00004380158,0.00013044142,0.0003133134],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061817875,0.00021461009,0.0002144761,0.0019222652,0.0050272355,0.0034579951,0.0007974154,0.0015337543,0.016267087],"category_scores_gemma":[0.0013672482,0.00018664708,0.00021045741,0.0031805465,0.0028754496,0.0018460979,0.0026885225,0.0011293999,0.00096165756],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008736987,0.0006959199,0.16410291,0.0010626297,0.000050364742,0.005792272,0.19769241,0.0018540423,0.0020952246,0.31525335,0.055207584,0.2553196],"study_design_scores_gemma":[0.000020679234,0.00027687344,0.23073119,0.0008799553,0.000031489457,0.0014293931,0.31847122,0.0006353385,0.00052656647,0.013971692,0.4329851,0.000040551196],"about_ca_topic_score_codex":0.035839044,"about_ca_topic_score_gemma":0.13818891,"teacher_disagreement_score":0.035839044,"about_ca_system_score_codex":0.0025942435,"about_ca_system_score_gemma":0.0023478488,"threshold_uncertainty_score":0.07126087},"labels":[],"label_agreement":null},{"id":"W2188985989","doi":"","title":"Field Pull-Out Tests On Scrap Tire Arrangements","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Soil Stabilization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Scrap; Reinforcement; Geotextile; Geotechnical engineering; Engineering; Waste management; Structural engineering; Materials science; Mechanical engineering","score_opus":0.006357547316327559,"score_gpt":0.21999009052972987,"score_spread":0.2136325432134023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2188985989","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9979152,0.00008756697,0.0013985632,0.000010140663,0.00001490412,0.000029491615,0.00015615443,0.000025764488,0.00036221603],"genre_scores_gemma":[0.9954508,0.00012641904,0.0021789677,0.000019964567,0.000008823868,0.000042369717,0.00039436674,0.00001759949,0.0017607332],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991462,0.000093144685,0.000073695875,0.00015718983,0.0003049527,0.00022473969],"domain_scores_gemma":[0.99698466,0.0010303546,0.0002938595,0.00029873487,0.0011019664,0.00029037724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008424878,0.0014585471,0.0006420454,0.00091795396,0.00065280346,0.00021057804,0.0006118273,0.0008814524,0.0028245084],"category_scores_gemma":[0.0015138908,0.00041457335,0.0005611644,0.0005472174,0.00057563244,0.0005147652,0.0006616004,0.00060453906,0.0003814866],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00093240745,0.0003161015,0.0023327156,0.00017135637,0.000029893645,0.00028008004,0.00037156916,0.002970788,0.98727685,0.000041533705,0.00014584826,0.0051308414],"study_design_scores_gemma":[0.00006451276,0.011626298,0.03494283,0.000043859323,0.00008516334,0.00023284683,0.00076256687,0.0036900388,0.9472197,0.0000836226,0.0012056703,0.00004287614],"about_ca_topic_score_codex":0.0013944614,"about_ca_topic_score_gemma":0.003387598,"teacher_disagreement_score":0.0028245084,"about_ca_system_score_codex":0.00024757232,"about_ca_system_score_gemma":0.00022852694,"threshold_uncertainty_score":0.0094489455},"labels":[],"label_agreement":null},{"id":"W2280191847","doi":"","title":"Keynote Lecture - Geotechnical Engineering Of The Stability Of Natural Slopes, And Cuts And Fills In Soil","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Soil Stabilization","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Geotechnical engineering; Natural (archaeology); Geology; Slope stability; Geotechnical investigation; Engineering geology","score_opus":0.0025983727349563894,"score_gpt":0.17237186354191877,"score_spread":0.16977349080696238,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2280191847","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014260654,0.073852755,0.058166772,0.049762733,0.2896977,0.000103043145,0.0015342588,0.000590838,0.5120312],"genre_scores_gemma":[0.038646813,0.017358659,0.0042996937,0.0013640305,0.044420026,0.00003165211,0.00055970164,0.00021329742,0.8931062],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997522,0.00002926726,0.00001169575,0.00008362455,0.00008149845,0.00004163983],"domain_scores_gemma":[0.9996057,0.000098263474,0.000013187579,0.000016678214,0.00012452909,0.00014157406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006506422,0.0015815136,0.0013385116,0.00086279766,0.0009010938,0.002284662,0.0009383556,0.0016963215,0.10637061],"category_scores_gemma":[0.0008393263,0.00027002388,0.0008036351,0.0006716298,0.00055953383,0.0020986483,0.0010396844,0.0023104511,0.021038698],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054639607,0.00029337764,0.00062765524,0.00035166493,0.00005196629,0.0003664773,0.00015575138,0.0045435405,0.0048986124,0.05999373,0.80260706,0.12556376],"study_design_scores_gemma":[0.00011621956,0.00055493816,0.003948587,0.00022351419,0.00011848004,0.00059531856,0.0003659809,0.009664334,0.0037424976,0.08089655,0.89972216,0.00005138522],"about_ca_topic_score_codex":0.0012906959,"about_ca_topic_score_gemma":0.0037481973,"teacher_disagreement_score":0.10637061,"about_ca_system_score_codex":0.0012200653,"about_ca_system_score_gemma":0.0007129007,"threshold_uncertainty_score":0.35584515},"labels":[],"label_agreement":null},{"id":"W2471882939","doi":"","title":"Physical Modelling Of Lnapl Infiltration In A Variably-Saturated Sand","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Soil and Unsaturated Flow","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Infiltration (HVAC); Environmental science; Geotechnical engineering; Geology; Petroleum engineering; Hydrology (agriculture); Meteorology; Geography","score_opus":0.008761326081685103,"score_gpt":0.20654014491683304,"score_spread":0.19777881883514792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2471882939","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9696525,0.00019891305,0.020821571,0.0001491166,0.000028686274,0.00003232348,0.00024367873,0.00036679162,0.008506347],"genre_scores_gemma":[0.99685574,0.0000785331,0.0009383799,0.000009540693,0.0000037651405,0.000008779078,0.000051610354,0.000015571168,0.0020379797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99989927,0.000019272411,0.000008092253,0.00002680577,0.000016753438,0.000029779916],"domain_scores_gemma":[0.99980193,0.0000962757,0.00002649845,0.000014346425,0.000043022676,0.000017955945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000181515,0.00031858307,0.00044763935,0.00037092404,0.00042731361,0.0010296053,0.00062891043,0.00079064764,0.0013000465],"category_scores_gemma":[0.00056173437,0.0002468805,0.0004276596,0.00050793134,0.00061981357,0.00069772615,0.0003860774,0.0003548194,0.00021278932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009823057,0.000056557525,0.0035791663,0.000028800823,0.000009472565,0.000083574014,0.000041973864,0.98613644,0.005965929,0.001014992,0.00009132724,0.002893509],"study_design_scores_gemma":[0.000006752577,0.000017284256,0.0008504154,0.0000018397757,0.000003598995,0.0000082253855,0.000015404958,0.99769384,0.0011411232,0.0001294907,0.00012719726,0.000004796924],"about_ca_topic_score_codex":0.036285512,"about_ca_topic_score_gemma":0.01878942,"teacher_disagreement_score":0.036285512,"about_ca_system_score_codex":0.0011754441,"about_ca_system_score_gemma":0.0008432266,"threshold_uncertainty_score":0.07214862},"labels":[],"label_agreement":null},{"id":"W2555232338","doi":"","title":"Lessons Learned From Full Scale Testing Of Geosynthetic Reinforced Soil Retaining Walls","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Soil Stabilization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Royal Military College of Canada","funders":"","keywords":"Geotechnical engineering; Full scale; Work (physics); Scale (ratio); Geosynthetics; Geology; Engineering; Civil engineering; Environmental science; Structural engineering; Geography; Mechanical engineering","score_opus":0.019625527828119948,"score_gpt":0.22870104938971383,"score_spread":0.2090755215615939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2555232338","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8294306,0.0063358126,0.13127005,0.0127628585,0.00050706853,0.00026217772,0.00042462646,0.001027159,0.017979652],"genre_scores_gemma":[0.90179056,0.0047727167,0.08693923,0.0010078521,0.00014229606,0.000103399056,0.0002818927,0.00024084096,0.004721145],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99819726,0.00063687214,0.000098488876,0.00019202549,0.0007309062,0.00014453035],"domain_scores_gemma":[0.9957724,0.0016126019,0.00014459509,0.0009965898,0.0011656472,0.00030805176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047355373,0.0006826525,0.00064217765,0.00040216537,0.0005340201,0.0011260959,0.0024666393,0.0012920388,0.0018742478],"category_scores_gemma":[0.0061137085,0.00033770018,0.00049926824,0.0003787348,0.0017539874,0.0021997269,0.0012268136,0.0016225575,0.0006095544],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004992779,0.0015891248,0.026130352,0.0010392556,0.000083796716,0.001209474,0.0026197329,0.1019572,0.1472815,0.007801147,0.009856233,0.69993293],"study_design_scores_gemma":[0.00042998133,0.021482084,0.09207346,0.0013171778,0.00023486832,0.0057975254,0.026301434,0.1566441,0.39677492,0.093378134,0.20487651,0.0006898241],"about_ca_topic_score_codex":0.0030140164,"about_ca_topic_score_gemma":0.005319613,"teacher_disagreement_score":0.0047355373,"about_ca_system_score_codex":0.0006911353,"about_ca_system_score_gemma":0.0005983365,"threshold_uncertainty_score":0.025044262},"labels":[],"label_agreement":null},{"id":"W2562593261","doi":"","title":"A Semi-Empirical Hazard Assessment Approach To Wedge Instability In Underground Mine Openings","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Rock Mechanics and Modeling","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Wedge (geometry); Geology; Hazard; Hazard analysis; Instability; Forensic engineering; Mining engineering; Geotechnical engineering; Engineering; Mathematics; Reliability engineering; Mechanics","score_opus":0.022569189184531345,"score_gpt":0.2847206041673653,"score_spread":0.26215141498283395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2562593261","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034421362,0.00008272957,0.96291065,0.00009581846,0.000011870365,0.000060386603,0.00008110854,0.00011786039,0.0022182178],"genre_scores_gemma":[0.8979876,0.00019214572,0.09830372,0.000037173202,0.000051322113,0.00020397276,0.00014479016,0.000062361425,0.0030169853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994715,0.00024857357,0.000036310612,0.00007002365,0.00012870037,0.000044883483],"domain_scores_gemma":[0.99629384,0.0027480035,0.00030168553,0.00018235543,0.0003979015,0.00007629158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015663808,0.0005295804,0.0008931107,0.001228704,0.00038932485,0.0011475054,0.0016176092,0.0009537893,0.0028637117],"category_scores_gemma":[0.0077655967,0.0006465923,0.0006886448,0.00065974094,0.000953197,0.0014099845,0.0014938307,0.0008345963,0.00031315934],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023097165,0.00003659945,0.0011242424,0.00004687941,0.00001972074,0.000075805096,0.00004618308,0.9700338,0.0004981275,0.009226435,0.00023518634,0.018633883],"study_design_scores_gemma":[0.0000021388992,0.0000075427088,0.000109182314,0.0000031211987,0.0000019635413,0.000011368935,0.000009633352,0.9969248,0.00005402587,0.0028136852,0.000060241942,0.000002271108],"about_ca_topic_score_codex":0.0054842765,"about_ca_topic_score_gemma":0.0046434985,"teacher_disagreement_score":0.0054842765,"about_ca_system_score_codex":0.000638599,"about_ca_system_score_gemma":0.0010172339,"threshold_uncertainty_score":0.010904729},"labels":[],"label_agreement":null},{"id":"W2750811440","doi":"","title":"Laboratory Testing Of Stress-Induced Brittle Fracture Damage Through Incremental Loading","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Rock Mechanics and Modeling","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Stress testing (software); Stress (linguistics); Fracture (geology); Brittleness; Forensic engineering; Structural engineering; Materials science; Engineering; Composite material; Computer science","score_opus":0.013312112399976444,"score_gpt":0.23813907333506124,"score_spread":0.22482696093508478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2750811440","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99455607,0.0000799366,0.004338734,0.00003146333,0.00001391868,0.00004105126,0.00009830317,0.00013526462,0.0007053473],"genre_scores_gemma":[0.9971782,0.00007458453,0.0017066847,0.000017967144,0.0000050801514,0.00004697989,0.00009341312,0.000019917614,0.00085723354],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99955994,0.00004144042,0.000025816846,0.00007473374,0.0001968523,0.000101121586],"domain_scores_gemma":[0.9990331,0.0002723605,0.00017836952,0.00019409673,0.00020492842,0.000117130956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037466898,0.00056795817,0.00030958347,0.00038109388,0.0004310236,0.0002650574,0.0010015654,0.00075757154,0.0028581293],"category_scores_gemma":[0.0009735512,0.0002838931,0.00040090657,0.00026017526,0.0007262719,0.0005317937,0.000500138,0.00063200376,0.000507988],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036105487,0.0005515885,0.0008224176,0.00004387252,0.000012629707,0.00010365939,0.00008872073,0.0018291867,0.9916449,0.00010156499,0.00011398488,0.004326335],"study_design_scores_gemma":[0.00007961421,0.0063360254,0.0050484356,0.000008735904,0.000024923731,0.00019332171,0.00010687476,0.009072109,0.97864807,0.00014832248,0.00031528476,0.000018349569],"about_ca_topic_score_codex":0.0007837677,"about_ca_topic_score_gemma":0.0010163313,"teacher_disagreement_score":0.0028581293,"about_ca_system_score_codex":0.00026135222,"about_ca_system_score_gemma":0.00032154506,"threshold_uncertainty_score":0.0095614195},"labels":[],"label_agreement":null},{"id":"W2750928038","doi":"","title":"The Morell Bridge A Case History In Monitoring The Impact Of An Excavation Close To An Abutment","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Excavation; Geology; Bridge (graph theory); Abutment; Forensic engineering; Engineering; Geotechnical engineering; Structural engineering; Medicine","score_opus":0.009864879722789857,"score_gpt":0.2573462004378912,"score_spread":0.24748132071510134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2750928038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97899854,0.00070561125,0.002345732,0.0025323045,0.00015510307,0.00007409556,0.00017901695,0.000049020153,0.014960573],"genre_scores_gemma":[0.9881346,0.0004916011,0.0018877492,0.0006110127,0.00012217807,0.000017047309,0.00009994657,0.000032888078,0.008603039],"study_design_codex":"case_report","study_design_gemma":"case_report","domain_scores_codex":[0.9990866,0.0001598202,0.00006784894,0.00017969309,0.0003460647,0.00015986015],"domain_scores_gemma":[0.99874806,0.0002986309,0.00020986077,0.00009424454,0.00018327437,0.00046593446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054638245,0.0007046893,0.00036538567,0.0029044517,0.0034552931,0.00087539596,0.0012432602,0.004660473,0.0034533367],"category_scores_gemma":[0.0045584715,0.0007082154,0.00050200307,0.0012860997,0.0013542037,0.0014846538,0.0018327571,0.0028656116,0.0006730796],"study_design_candidate":"case_report","study_design_consensus":"case_report","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034213625,0.0004905907,0.10030177,0.0001920212,0.00004376847,0.83692324,0.017530879,0.0007307974,0.010229948,0.00073697855,0.0031041496,0.029373778],"study_design_scores_gemma":[0.000023073942,0.0015737463,0.1826146,0.00024675543,0.00009836834,0.7569272,0.022720095,0.0016473464,0.006222688,0.0010503295,0.02674249,0.00013330576],"about_ca_topic_score_codex":0.008464583,"about_ca_topic_score_gemma":0.034438964,"teacher_disagreement_score":0.008464583,"about_ca_system_score_codex":0.0013922773,"about_ca_system_score_gemma":0.0006485611,"threshold_uncertainty_score":0.016830623},"labels":[],"label_agreement":null},{"id":"W2752259268","doi":"","title":"Managing Risks In A Large Remediation Project Albion Explosives Facility","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Environmental remediation; Explosive material; Environmental science; Environmental planning; Forensic engineering; Engineering; Geography; Contamination","score_opus":0.0861806889195596,"score_gpt":0.3916081402566315,"score_spread":0.3054274513370719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2752259268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98410934,0.000040433653,0.008511993,0.00091534405,0.000015565463,0.00020238223,0.00006088461,0.0003518751,0.0057920283],"genre_scores_gemma":[0.98686117,0.00003827554,0.007908773,0.000042002954,0.00000929442,0.000050788978,0.00004430299,0.000026426735,0.0050189807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99903417,0.00033163236,0.000024354162,0.00009705195,0.00031782343,0.00019505109],"domain_scores_gemma":[0.99812394,0.0008776594,0.00019955498,0.00012052813,0.0002810818,0.00039724112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014583617,0.000629752,0.00030944272,0.00069029606,0.0039213947,0.0015076532,0.0014166887,0.0017752022,0.004039259],"category_scores_gemma":[0.0022158762,0.0003460528,0.0004085674,0.00029701373,0.00069267274,0.0010424823,0.0012742893,0.0013864171,0.00040532972],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006013348,0.009483464,0.06512217,0.0002847677,0.0003024196,0.026695963,0.005821515,0.46550146,0.14059332,0.009973268,0.010236573,0.25997177],"study_design_scores_gemma":[0.00073474366,0.010430029,0.05048303,0.000072803996,0.0002483542,0.00316189,0.01657471,0.8401455,0.05118558,0.006712864,0.020006835,0.00024364027],"about_ca_topic_score_codex":0.016771093,"about_ca_topic_score_gemma":0.024691787,"teacher_disagreement_score":0.016771093,"about_ca_system_score_codex":0.0028099983,"about_ca_system_score_gemma":0.0035732482,"threshold_uncertainty_score":0.03334689},"labels":[],"label_agreement":null},{"id":"W2753750420","doi":"","title":"Non-Linear Analysis Of Buried Hdpe Pipe By The Finite Element Method: Comparison With Laboratory Test","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Finite element method; High-density polyethylene; Structural engineering; Engineering; Mathematics; Materials science; Composite material; Polyethylene","score_opus":0.004982240191564948,"score_gpt":0.2402066171470836,"score_spread":0.23522437695551865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2753750420","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7157249,0.00022098665,0.2741493,0.000147447,0.000029813604,0.00006192575,0.00017111935,0.0009852137,0.0085093165],"genre_scores_gemma":[0.98524517,0.000077949844,0.012174358,0.000013484635,0.000004555231,0.00003355844,0.00006436762,0.00003690844,0.00234973],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998166,0.00004985306,0.0000070507294,0.000024338813,0.00008636317,0.00001573821],"domain_scores_gemma":[0.99945086,0.00030285516,0.000044949033,0.00007107824,0.0001144754,0.000015771706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035074443,0.00038850974,0.00043287838,0.00031272133,0.00028766942,0.0003748269,0.0007337452,0.0006771939,0.0025855016],"category_scores_gemma":[0.0007071752,0.00025821806,0.00034159634,0.00027431315,0.0005372774,0.00062220445,0.00039825085,0.00031623634,0.00034158002],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000556206,0.00027544802,0.003992642,0.00028587307,0.00003836306,0.00024072913,0.0003125515,0.7795272,0.15639368,0.0021109174,0.000676041,0.055590324],"study_design_scores_gemma":[0.000022420869,0.000205049,0.0021176354,0.000010975498,0.000012743316,0.00005474514,0.000093073475,0.97556746,0.020968638,0.00040316384,0.0005304965,0.000013591839],"about_ca_topic_score_codex":0.0017661662,"about_ca_topic_score_gemma":0.0017614664,"teacher_disagreement_score":0.0025855016,"about_ca_system_score_codex":0.0002783354,"about_ca_system_score_gemma":0.00036997194,"threshold_uncertainty_score":0.008649349},"labels":[],"label_agreement":null},{"id":"W2755375674","doi":"","title":"The Influence Of Program Accreditation On Geological Engineering Education In Canada","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Engineering Education and Curriculum Development","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Accreditation; Engineering ethics; Political science; Engineering; Law","score_opus":0.0027162547423745676,"score_gpt":0.21325112421488776,"score_spread":0.21053486947251318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2755375674","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9119798,0.0017747915,0.0004284102,0.03874496,0.00028031596,0.00009868264,0.0009542077,0.00010279177,0.045635983],"genre_scores_gemma":[0.98489755,0.00044536407,0.00018427681,0.0015393316,0.00003539573,0.000014692116,0.00016249427,0.0000284401,0.012692488],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.98869544,0.0013906007,0.0003592325,0.00053373433,0.00391805,0.005102934],"domain_scores_gemma":[0.90321934,0.01343115,0.004855464,0.0009071612,0.046784297,0.030802548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064491653,0.00018503933,0.00049134257,0.0025434352,0.010247238,0.0059655146,0.002519379,0.002146222,0.007402527],"category_scores_gemma":[0.033744216,0.0004199883,0.0005867648,0.0034115338,0.0033997535,0.0010196773,0.003061348,0.003529422,0.0003667547],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.0011057556,0.00072733243,0.7810335,0.00030437612,0.00019826143,0.0009042846,0.01412664,0.0040635956,0.0017432737,0.029211642,0.05852803,0.10805322],"study_design_scores_gemma":[0.000055406468,0.00009955404,0.944989,0.00021407114,0.000065516484,0.000091725546,0.015975296,0.0017896867,0.00066094694,0.00076649175,0.03522613,0.00006614246],"about_ca_topic_score_codex":0.9957949,"about_ca_topic_score_gemma":0.9986651,"teacher_disagreement_score":0.8402817,"about_ca_system_score_codex":0.15971828,"about_ca_system_score_gemma":0.35877877,"threshold_uncertainty_score":0.9746077},"labels":[],"label_agreement":null},{"id":"W2785098868","doi":"","title":"What Is A Geological Engineer? Lessons From Canadian Education Experience","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geological Modeling and Analysis","field":"Earth and Planetary Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Engineering ethics; Engineering education; Political science; Engineering; Public relations; Engineering management","score_opus":0.013800987974062475,"score_gpt":0.24509183692068465,"score_spread":0.23129084894662216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2785098868","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"incentives","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":"incentives","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37803742,0.008814807,0.0011945106,0.37136614,0.0031243828,0.000119797594,0.0003531576,0.00009791282,0.23689185],"genre_scores_gemma":[0.83131737,0.011335155,0.0014188834,0.023331963,0.00022545752,0.00004044344,0.0002369151,0.00012534847,0.13196856],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9922191,0.0014521303,0.00018758496,0.0004662053,0.0027343696,0.002940686],"domain_scores_gemma":[0.9688043,0.0021953254,0.0005369359,0.00022599302,0.007173162,0.021064347],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.0083914725,0.0004643843,0.000433929,0.0017195385,0.03174411,0.010524164,0.0024556185,0.0037065956,0.01053843],"category_scores_gemma":[0.012588031,0.00045763337,0.0003691289,0.0032313417,0.008049087,0.0045293774,0.0070337453,0.0072593335,0.0012047488],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010340393,0.00088922743,0.027610643,0.00024146319,0.000020371268,0.002624188,0.4683961,0.00047511587,0.0006582756,0.020705342,0.3573143,0.12096158],"study_design_scores_gemma":[0.000017445933,0.000066946835,0.01393584,0.00037333844,0.000012526613,0.00046642058,0.47457308,0.00012255278,0.00017829149,0.0017523539,0.5084386,0.00006269133],"about_ca_topic_score_codex":0.9481258,"about_ca_topic_score_gemma":0.9915724,"teacher_disagreement_score":0.9916085,"about_ca_system_score_codex":0.076727875,"about_ca_system_score_gemma":0.19114168,"threshold_uncertainty_score":0.55670226},"labels":[],"label_agreement":null},{"id":"W2799310665","doi":"","title":"Deep Geological Repositories: A Safe And Secure Solution To Disposal Of Nuclear Wastes","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Nuclear and radioactivity studies","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Radioactive waste; Waste management; Waste disposal; Business; Engineering","score_opus":0.0036649366574364015,"score_gpt":0.19757891623754545,"score_spread":0.19391397958010906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2799310665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5604702,0.011322191,0.36447164,0.014880008,0.0007766637,0.00027446751,0.000625492,0.0015468436,0.04563258],"genre_scores_gemma":[0.8572762,0.008149739,0.10057019,0.001173614,0.00014579447,0.00008700557,0.00040117023,0.00016925587,0.03202701],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9990625,0.00020078273,0.000045772693,0.0000528849,0.00051445543,0.00012362187],"domain_scores_gemma":[0.9994129,0.00009243885,0.00011872972,0.00014072315,0.00015403604,0.000081078135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012971931,0.00033818232,0.00039103808,0.00121626,0.0007624425,0.0025906283,0.0010451374,0.00154125,0.0030345183],"category_scores_gemma":[0.0011680785,0.00026904605,0.0003022605,0.0010604328,0.00089063187,0.0027737012,0.003224902,0.0011274382,0.0010881947],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012081871,0.0003343144,0.013812191,0.0008612199,0.00009643417,0.001573221,0.0010683521,0.012812223,0.18824163,0.095867485,0.013431737,0.670693],"study_design_scores_gemma":[0.00051907054,0.0034402418,0.0140096545,0.0008376639,0.00030211097,0.010010513,0.004762828,0.02759135,0.439461,0.15826276,0.34060365,0.00019916252],"about_ca_topic_score_codex":0.00058000383,"about_ca_topic_score_gemma":0.0017581802,"teacher_disagreement_score":0.0030345183,"about_ca_system_score_codex":0.0006594003,"about_ca_system_score_gemma":0.0025367083,"threshold_uncertainty_score":0.0101515055},"labels":[],"label_agreement":null},{"id":"W2803759846","doi":"","title":"Experience In Geotechnical Design Of Overseas Port Facilities","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Port (circuit theory); Civil engineering; Engineering; Geotechnical engineering","score_opus":0.014523629252375289,"score_gpt":0.23321004721342137,"score_spread":0.21868641796104607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803759846","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8687346,0.00061131176,0.03743483,0.0006673608,0.0000619215,0.00009718162,0.00013140425,0.00023651659,0.092024945],"genre_scores_gemma":[0.9413931,0.0008112842,0.024529394,0.000100607955,0.000020219155,0.000025581354,0.00013983225,0.00011666653,0.03286331],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99775594,0.0012609224,0.000097161734,0.0001372782,0.0005273655,0.00022125794],"domain_scores_gemma":[0.99778664,0.0008290049,0.00010084289,0.00035346474,0.0005023474,0.0004276683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003340377,0.0008096849,0.00034834797,0.0007063631,0.0019801192,0.0022971467,0.0010600146,0.0011570603,0.009264756],"category_scores_gemma":[0.0034224049,0.00035641433,0.00039833668,0.0014391649,0.0011125024,0.0013448187,0.0014956169,0.0009207275,0.0011909832],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011735942,0.0035206918,0.04271524,0.00064748636,0.00007172911,0.004351778,0.115876116,0.058259636,0.03483559,0.025244866,0.010255095,0.7030481],"study_design_scores_gemma":[0.00019672795,0.0076453527,0.052968435,0.00046732315,0.00016491108,0.007098635,0.14232579,0.054024376,0.040646553,0.010578085,0.68365914,0.00022479576],"about_ca_topic_score_codex":0.007149095,"about_ca_topic_score_gemma":0.021395294,"teacher_disagreement_score":0.009264756,"about_ca_system_score_codex":0.0015593315,"about_ca_system_score_gemma":0.0018571607,"threshold_uncertainty_score":0.03099376},"labels":[],"label_agreement":null},{"id":"W2809277837","doi":"","title":"Soil Improvement And Staged Embankment Construction In Soft Clays","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Soil Stabilization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Levee; Geotechnical engineering; Geology","score_opus":0.002910439352853766,"score_gpt":0.1815720699434591,"score_spread":0.17866163059060533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2809277837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9903252,0.00015752531,0.007318387,0.000044896336,0.000007597775,0.000019894034,0.000035009147,0.000055031753,0.0020366292],"genre_scores_gemma":[0.99471235,0.000058913392,0.0031753052,0.0000057490984,0.0000025053441,0.000004200081,0.000028919849,0.000005683013,0.0020063599],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997948,0.000055916073,0.000009709587,0.000029679277,0.000056008565,0.000053946136],"domain_scores_gemma":[0.9997733,0.00004625168,0.00004110988,0.000023852506,0.00006936793,0.000046089033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028375562,0.00026686865,0.00025085267,0.0005615456,0.00032310272,0.00052410376,0.00041117414,0.00035040418,0.0021881526],"category_scores_gemma":[0.00062198954,0.00012922898,0.0002663867,0.00046310126,0.00037997708,0.00027375403,0.0004620785,0.00023997453,0.00017226479],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002657209,0.0010488434,0.039038725,0.00051640335,0.000079386366,0.0007833054,0.0010102994,0.13930176,0.52281284,0.00460637,0.000944989,0.28719988],"study_design_scores_gemma":[0.00034520257,0.0102458615,0.40114784,0.00013764866,0.00024966264,0.00095509936,0.002678913,0.2444919,0.31634846,0.0063642687,0.016917992,0.00011707452],"about_ca_topic_score_codex":0.006292853,"about_ca_topic_score_gemma":0.027314927,"teacher_disagreement_score":0.006292853,"about_ca_system_score_codex":0.00055317074,"about_ca_system_score_gemma":0.000705538,"threshold_uncertainty_score":0.012512445},"labels":[],"label_agreement":null},{"id":"W2904171538","doi":"","title":"Experimental 3d-Deformation Analysis Of Frozen Soil For Tunnelling Projects In The Netherlands","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Climate change and permafrost","field":"Earth and Planetary Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Quantum tunnelling; Deformation (meteorology); Geology; Geotechnical engineering; Forensic engineering; Engineering; Physics; Oceanography","score_opus":0.03074573084906682,"score_gpt":0.2690940882662829,"score_spread":0.23834835741721608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2904171538","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980925,0.000011144727,0.00061733415,0.0000041850594,0.0000014929977,0.00001156937,0.00045665324,0.000016911565,0.00078823935],"genre_scores_gemma":[0.9987411,0.000010813066,0.0005131242,0.0000013774161,4.0947177e-7,0.000011032024,0.00035639454,0.000008796235,0.0003570268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99980074,0.00002647609,0.000011602905,0.000051263163,0.00006039263,0.000049582155],"domain_scores_gemma":[0.99975294,0.00006503343,0.000026268342,0.000042025116,0.00008093588,0.00003288199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036503366,0.00029490708,0.00036828162,0.00046427324,0.0005230391,0.00042428236,0.000599363,0.00058853923,0.0015974775],"category_scores_gemma":[0.00057880575,0.0002586421,0.00032773768,0.0008402458,0.00043007985,0.00041683472,0.0002492841,0.00022660392,0.00027297685],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0036734068,0.0017544961,0.15620504,0.00033587663,0.00014930897,0.001549828,0.0019886203,0.4388946,0.34790093,0.0008735525,0.0014398444,0.04523448],"study_design_scores_gemma":[0.00022040764,0.0016799677,0.58849895,0.000035561712,0.00012080487,0.00036754075,0.0015041042,0.31594816,0.08760703,0.0005238989,0.003398475,0.00009500557],"about_ca_topic_score_codex":0.033557903,"about_ca_topic_score_gemma":0.07039745,"teacher_disagreement_score":0.033557903,"about_ca_system_score_codex":0.0006659228,"about_ca_system_score_gemma":0.0005935059,"threshold_uncertainty_score":0.066725135},"labels":[],"label_agreement":null},{"id":"W2907648850","doi":"","title":"Evaluation Of Current Practice For Analysis Of Pile Groups Under Seismic Loading","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Pile; Current (fluid); Geology; Seismic analysis; Geotechnical engineering; Forensic engineering; Engineering","score_opus":0.02206567801439148,"score_gpt":0.3041657186618871,"score_spread":0.2821000406474956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907648850","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059145708,0.003793404,0.9144838,0.0022918072,0.0003562752,0.00037842113,0.0006131952,0.0031678318,0.015769549],"genre_scores_gemma":[0.35128814,0.0039648465,0.6362528,0.00041537423,0.00031213005,0.00044248416,0.0014018507,0.000686979,0.0052352548],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9745841,0.008517396,0.0020110449,0.0027289763,0.011597358,0.00056100707],"domain_scores_gemma":[0.88552356,0.041772418,0.0030327297,0.018250462,0.049796756,0.0016240829],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027995307,0.0012918728,0.0010274143,0.0045613116,0.0014766234,0.0047573196,0.0075234803,0.0030706588,0.0061938055],"category_scores_gemma":[0.09665957,0.0007610179,0.00073844515,0.003821458,0.00272934,0.0052378876,0.002297161,0.0016895095,0.005591497],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011570939,0.0010471982,0.038852494,0.0016213431,0.0002716027,0.00024348771,0.0020052425,0.03931025,0.02361223,0.019062568,0.008542313,0.8642741],"study_design_scores_gemma":[0.00050005334,0.0023681826,0.04711064,0.002721903,0.0009349882,0.0025364524,0.0065840846,0.66905385,0.07944983,0.060444288,0.12789008,0.000405612],"about_ca_topic_score_codex":0.00729871,"about_ca_topic_score_gemma":0.010200361,"teacher_disagreement_score":0.027995307,"about_ca_system_score_codex":0.0021541333,"about_ca_system_score_gemma":0.0029483512,"threshold_uncertainty_score":0.14805508},"labels":[],"label_agreement":null},{"id":"W3021183645","doi":"","title":"Understanding The Hydrogeology Of A Bauxite Residue Disposal Area","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Bauxite Residue and Utilization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Bauxite; Hydrogeology; Residue (chemistry); Geology; Mining engineering; Environmental science; Geotechnical engineering; Chemistry","score_opus":0.025866266253899477,"score_gpt":0.22052586850501066,"score_spread":0.19465960225111117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021183645","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99210703,0.00012251362,0.0030889644,0.00017598676,0.000005627871,0.000014547944,0.00010495659,0.00003543006,0.004344853],"genre_scores_gemma":[0.99794513,0.000111515496,0.00091303146,0.000017240072,0.0000041250255,0.0000035626979,0.00006533701,0.0000038893677,0.00093610265],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99993813,0.0000057150814,0.000002460648,0.000017319866,0.00001711286,0.000019181642],"domain_scores_gemma":[0.99995136,0.000009408711,0.000009638302,0.0000026261343,0.000017353394,0.000009565612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000075926764,0.00016019044,0.00020717451,0.000605085,0.0005210718,0.0009520384,0.00023943857,0.0005463408,0.0010191809],"category_scores_gemma":[0.00013373449,0.0001261768,0.00012616406,0.00039084707,0.00035055756,0.0005850156,0.00025574662,0.00022023456,0.00014337986],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004116534,0.00022633218,0.4169693,0.0001690357,0.000070952505,0.0016602452,0.0016765685,0.04807974,0.4559086,0.0032949534,0.00083760056,0.07069507],"study_design_scores_gemma":[0.00002125319,0.00015395011,0.8335918,0.00003172765,0.000036980247,0.00062691263,0.0055770655,0.111453116,0.03842686,0.0031066616,0.0069280798,0.000045475506],"about_ca_topic_score_codex":0.02823791,"about_ca_topic_score_gemma":0.039670292,"teacher_disagreement_score":0.02823791,"about_ca_system_score_codex":0.00073404907,"about_ca_system_score_gemma":0.0006249412,"threshold_uncertainty_score":0.0561471},"labels":[],"label_agreement":null},{"id":"W3022659591","doi":"","title":"Practical Considerations In The Use Of Rock Mass Classification In Mining","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Mineral Processing and Grinding","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; University of Saskatchewan","funders":"","keywords":"Rock mass classification; Mining engineering; Computer science; Data mining; Geology; Artificial intelligence; Geotechnical engineering","score_opus":0.07923791667703894,"score_gpt":0.30307169421524993,"score_spread":0.223833777538211,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3022659591","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039184853,0.011107733,0.8439414,0.06372411,0.0022271285,0.0007163321,0.0005607508,0.0022272507,0.036310423],"genre_scores_gemma":[0.26773077,0.003415147,0.7138022,0.003135344,0.0012620997,0.00035953458,0.00027068582,0.00040878964,0.009615421],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9833161,0.010158756,0.0010384703,0.0010532176,0.0041364203,0.0002969578],"domain_scores_gemma":[0.91882825,0.060114954,0.0019009785,0.0050161434,0.013169333,0.0009703921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02317267,0.0016011603,0.0017609366,0.0029120357,0.0025148354,0.009506326,0.0059578572,0.006035659,0.010591036],"category_scores_gemma":[0.08599436,0.0009066836,0.00093261205,0.0027982872,0.004606851,0.007710543,0.0031962453,0.0040898095,0.0051404815],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019120513,0.0007336255,0.028188834,0.002193964,0.00026126744,0.0015890939,0.0018690997,0.037092306,0.021343224,0.094308816,0.03655938,0.7739484],"study_design_scores_gemma":[0.0006328068,0.002041588,0.035396527,0.0027666488,0.00047248864,0.012440216,0.010768487,0.32091716,0.039644193,0.35288706,0.2211139,0.0009189783],"about_ca_topic_score_codex":0.011120529,"about_ca_topic_score_gemma":0.021423817,"teacher_disagreement_score":0.02317267,"about_ca_system_score_codex":0.0016040571,"about_ca_system_score_gemma":0.0029657434,"threshold_uncertainty_score":0.12255019},"labels":[],"label_agreement":null},{"id":"W3022697995","doi":"","title":"Slope Stability By Limit Analysis And Stochastic Conditioning","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"Geotechnical Engineering and Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Moncton","funders":"","keywords":"Stability (learning theory); Limit (mathematics); Conditioning; Mathematics; Econometrics; Statistics; Computer science; Mathematical analysis","score_opus":0.0037393938594339725,"score_gpt":0.1906886091105102,"score_spread":0.18694921525107622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3022697995","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03282683,0.0005420745,0.95128477,0.0007316366,0.00010534753,0.000030281952,0.00008908072,0.00019987958,0.014190107],"genre_scores_gemma":[0.9118756,0.0011255972,0.05848264,0.00036401016,0.00035572035,0.00019073351,0.00019571635,0.0004497659,0.026960375],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990759,0.00035601266,0.000048861915,0.00019249589,0.00021789857,0.00010876433],"domain_scores_gemma":[0.9962126,0.002029257,0.0005065634,0.00036566443,0.0006761577,0.00020970724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031222636,0.0009547986,0.0014664326,0.002554725,0.0011894907,0.0024034109,0.0016369466,0.0012045205,0.0054676514],"category_scores_gemma":[0.011748111,0.0007761631,0.0019342031,0.0012715916,0.004321784,0.0042463653,0.003990589,0.0025352777,0.0005512391],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050159575,0.0000353553,0.00069048756,0.00006486175,0.000058360183,0.000052584834,0.0001240931,0.11607947,0.0012639565,0.87028444,0.0012742957,0.010021909],"study_design_scores_gemma":[0.0000065947584,0.000012200397,0.00023755763,0.000014246673,0.000014664315,0.000030421063,0.000016416552,0.5777162,0.00036271106,0.4208967,0.0006741009,0.000018242345],"about_ca_topic_score_codex":0.0050808447,"about_ca_topic_score_gemma":0.0037284084,"teacher_disagreement_score":0.0054676514,"about_ca_system_score_codex":0.0018409524,"about_ca_system_score_gemma":0.0014759031,"threshold_uncertainty_score":0.018291116},"labels":[],"label_agreement":null}]}