{"meta":{"query_hash":"31efadf4dc1f","filters":{"venue":"Indian highways"},"cohort_total":4,"direct_labels_cover":0,"predictions_cover":4,"exported":4,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/31efadf4dc1f","api":"https://metacan.xera.ac/api/v1/cohort?venue=Indian+highways"},"results":[{"id":"W1274037378","doi":"","title":"Planning of Skywalk at an Institutional Area, Study Area: ITO, Indraprastha Estate, New Delhi","year":2015,"lang":"en","type":"article","venue":"Indian highways","topic":"Evacuation and Crowd Dynamics","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pedestrian; TRIPS architecture; Transport engineering; Work (physics); Real estate; Business; Geography; Environmental planning; Economic growth; Engineering; Finance; Economics","score_opus":0.05556584221943194,"score_gpt":0.26419219507106717,"score_spread":0.20862635285163522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1274037378","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9887184,0.00007494509,0.002319683,0.00001761409,0.00042967175,0.00019975286,0.000047327772,0.00037857334,0.007814034],"genre_scores_gemma":[0.9987707,0.0000056162244,0.0007588894,0.00003058514,0.00009961194,0.0000114909535,0.00012824374,0.000029119039,0.00016572577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99892175,0.000025275793,0.00030183047,0.00018613882,0.0003294821,0.00023550302],"domain_scores_gemma":[0.9992585,0.000030308905,0.00005897328,0.00026189702,0.000073809635,0.00031649417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001694077,0.00017938891,0.00020057907,0.00019432539,0.000079990794,0.000036190188,0.00020286055,0.00010306655,0.000060706785],"category_scores_gemma":[0.00003558008,0.00018526413,0.00003597826,0.00024567463,0.000041696112,0.0003023095,0.00004559214,0.00016723502,0.00006668097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009787607,0.00044037114,0.29942948,0.00006102814,0.00020586194,0.00039225395,0.04212992,0.6283813,0.0013147325,0.0011175914,0.020775907,0.005653696],"study_design_scores_gemma":[0.014283076,0.002343304,0.5734963,0.00041064183,0.00021901209,0.00039389695,0.019825893,0.3353941,0.005583841,0.0019656424,0.04289671,0.003187592],"about_ca_topic_score_codex":0.00011049336,"about_ca_topic_score_gemma":0.00053523807,"teacher_disagreement_score":0.2929872,"about_ca_system_score_codex":0.00020780753,"about_ca_system_score_gemma":0.00017666465,"threshold_uncertainty_score":0.7554852},"labels":[],"label_agreement":null},{"id":"W1507330922","doi":"","title":"ITS around the world and need for ITS on Indian roads","year":2005,"lang":"en","type":"article","venue":"Indian highways","topic":"Traffic Prediction and Management Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; Intelligent transportation system; Intersection (aeronautics); Advanced Traffic Management System; Pedestrian; Information system; Management system; Collision avoidance; Engineering; Computer security; Collision; Computer science; Operations management","score_opus":0.01356569575393848,"score_gpt":0.22452562402826493,"score_spread":0.21095992827432644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1507330922","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77307487,0.001881619,0.008574463,0.015557857,0.0028946165,0.0050016623,0.00031318326,0.035736486,0.15696524],"genre_scores_gemma":[0.99751157,0.00007515872,0.00027502206,0.00068956806,0.00037014735,0.00012338378,0.0000112327,0.000030406782,0.00091354165],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99938977,0.00000929854,0.00013527765,0.00013863326,0.0000985389,0.00022850794],"domain_scores_gemma":[0.99967444,0.000052654505,0.000020892245,0.00016435937,0.000012388203,0.000075252574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000117792,0.0001324898,0.000097427604,0.0002089448,0.000114176975,0.0000771191,0.00014991155,0.000061160674,0.000015030331],"category_scores_gemma":[0.000010249027,0.00010864957,0.000037170077,0.00015927956,0.000019012165,0.00013924426,0.000020313162,0.00013938549,0.00007621902],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029632512,0.000064034444,0.00013082354,0.00016431093,0.00013780793,0.000016076818,0.0024522273,0.0038743422,0.0011302067,0.044194013,0.8477472,0.10005929],"study_design_scores_gemma":[0.0006277441,0.00007839382,0.002546862,0.00005833519,0.0000214881,0.0000064534483,0.0001326412,0.020896165,0.013068103,0.000084125524,0.9621937,0.00028598812],"about_ca_topic_score_codex":0.0000016257574,"about_ca_topic_score_gemma":0.00016333062,"teacher_disagreement_score":0.22443667,"about_ca_system_score_codex":0.000054306754,"about_ca_system_score_gemma":0.0000058299925,"threshold_uncertainty_score":0.44306007},"labels":[],"label_agreement":null},{"id":"W15371206","doi":"10.1080/15287390490492421","title":"Optimum spacing and design of drainage culverts in the hilly stretch of Buangpui-Lunglei State Road in Mizoram","year":2011,"lang":"en","type":"article","venue":"Indian highways","topic":"Water Systems and Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Culvert; Terrain; Drainage; Geotechnical engineering; Ridge; Environmental science; Slab; Inlet; Hydraulic structure; Hydrology (agriculture); Geology; Engineering; Structural engineering; Geography; Geomorphology","score_opus":0.01964121251613875,"score_gpt":0.18180349246494404,"score_spread":0.16216227994880528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W15371206","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99317557,0.0002132136,0.004469898,0.000010787118,0.0001032203,0.0003425137,0.000015026211,0.000044723525,0.0016250319],"genre_scores_gemma":[0.9979044,0.000028889217,0.0020068113,0.0000042100028,0.000011110063,0.0000117080135,0.000004092335,0.000017820861,0.000010930323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992502,0.00006438759,0.00029821662,0.00010908202,0.0001019083,0.00017621394],"domain_scores_gemma":[0.9996929,0.000031277526,0.00005793637,0.00017085671,0.000019617677,0.000027387376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031272898,0.000108579916,0.00019279998,0.00019365671,0.000013214994,0.000013615227,0.00012120196,0.00006574039,0.0000069999555],"category_scores_gemma":[0.0000105112085,0.0000871542,0.000019269213,0.00022064606,0.000029221665,0.00013859666,0.000017328723,0.0000876122,0.0000015024857],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000110004024,0.00023514933,0.058448814,0.0012688705,0.00011325057,0.00039710585,0.3273838,0.5984789,0.0050841672,0.0013889605,0.0011642479,0.0059267157],"study_design_scores_gemma":[0.0050720805,0.0007682911,0.45562184,0.0018888694,0.00005924038,0.00007002579,0.0064410255,0.44947556,0.07614745,0.002856914,0.00019152294,0.0014071771],"about_ca_topic_score_codex":0.0008558772,"about_ca_topic_score_gemma":0.00050472387,"teacher_disagreement_score":0.39717302,"about_ca_system_score_codex":0.000028388997,"about_ca_system_score_gemma":0.00001221214,"threshold_uncertainty_score":0.3554045},"labels":[],"label_agreement":null},{"id":"W657754062","doi":"","title":"Modification of stopping sight distance and length of crest vertical curve using air resistance and drag force parameters","year":2011,"lang":"en","type":"article","venue":"Indian highways","topic":"Traffic Prediction and Management Techniques","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Drag; Braking distance; Aerodynamic drag; Sight; Drag coefficient; Wind speed; Aerodynamics; Simulation; Acceleration; Crest; Meteorology; Environmental science; Marine engineering; Aerospace engineering; Geodesy; Computer science; Engineering; Physics; Automotive engineering; Geology; Optics; Classical mechanics","score_opus":0.029999504524258556,"score_gpt":0.21742659336267137,"score_spread":0.1874270888384128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W657754062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8510949,0.00028767344,0.14649452,0.000013082433,0.00006152693,0.00014781402,0.000015739452,0.000540404,0.0013443563],"genre_scores_gemma":[0.9937555,0.00012492346,0.0060773003,0.000007966861,0.0000060719344,0.0000066278244,0.0000025781087,0.00001232964,0.0000066879165],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994898,0.000013730222,0.0001897509,0.00012040576,0.00007789346,0.00010843856],"domain_scores_gemma":[0.99972975,0.000027986147,0.00003513484,0.00014402706,0.000018124985,0.000044947512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007772841,0.00008160108,0.00012483148,0.00009007091,0.00003001347,0.0000060864145,0.00006370818,0.000050746105,0.0000010645601],"category_scores_gemma":[0.000013759923,0.00008679705,0.00001746271,0.00008737815,0.0001039928,0.00013996352,0.000017500532,0.000060754097,2.3236305e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085875636,0.00071782304,0.05603354,0.010133302,0.001105155,0.00011438818,0.062223803,0.014153012,0.26328355,0.54351526,0.010665343,0.03719604],"study_design_scores_gemma":[0.0021955008,0.00029970516,0.25908756,0.0015487472,0.0002467502,0.000014731097,0.0013274924,0.31876928,0.40828568,0.0031918003,0.0037486127,0.0012841736],"about_ca_topic_score_codex":0.000020852473,"about_ca_topic_score_gemma":0.000032168657,"teacher_disagreement_score":0.5403235,"about_ca_system_score_codex":0.000023614377,"about_ca_system_score_gemma":0.000004812908,"threshold_uncertainty_score":0.35394812},"labels":[],"label_agreement":null}]}