{"meta":{"query_hash":"7d4e09119633","filters":{"venue":"International Journal of Industrialized Construction"},"cohort_total":10,"direct_labels_cover":0,"predictions_cover":10,"exported":10,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/7d4e09119633","api":"https://metacan.xera.ac/api/v1/cohort?venue=International+Journal+of+Industrialized+Construction"},"results":[{"id":"W3044390034","doi":"10.29173/ijic217","title":"Development of Automated Top-Down Construction System for Low-rise Building Structures","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Education, India; Division of Human Resource Development; Indian Institute of Technology Madras; Curtin University of Technology; Department of Science and Technology, Ministry of Science and Technology, India","keywords":"Automation; Construct (python library); Structural system; Frame (networking); Function (biology); Computer science; Engineering; Systems engineering; Mechanical engineering; Civil engineering","score_opus":0.021304602436279317,"score_gpt":0.2601773538175763,"score_spread":0.23887275138129696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044390034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7908976,0.00012794159,0.19491822,0.00024823632,0.012679578,0.00032781545,0.00006962457,0.00036486235,0.00036610314],"genre_scores_gemma":[0.8837595,0.0000145014965,0.11493891,0.000015781365,0.0012177224,0.00001086376,0.000016925256,0.000023832346,0.0000019930528],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9977166,0.000048529575,0.0014214702,0.00015533161,0.00050161954,0.00015644933],"domain_scores_gemma":[0.9978787,0.000066077955,0.00082472846,0.00008044318,0.00102487,0.0001251816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002485676,0.00020869772,0.00040553263,0.00036372224,0.00007550263,0.000088270346,0.00028734346,0.00024627626,0.000065811495],"category_scores_gemma":[0.0001875062,0.00020083408,0.00019075946,0.00025061332,0.000110394656,0.00039413033,0.000021219916,0.00029376522,0.0000018977742],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017604022,0.000030318131,0.0009364425,0.00026867996,0.0017719618,0.000012689957,0.0011830187,0.016303606,0.32038993,0.054401617,0.0016101599,0.6013312],"study_design_scores_gemma":[0.00962138,0.00017054821,0.00018813131,0.000731813,0.0002299292,0.0016336595,0.006667817,0.06030853,0.8981089,0.00097208685,0.020807542,0.00055969],"about_ca_topic_score_codex":0.0000034216473,"about_ca_topic_score_gemma":9.3269904e-7,"teacher_disagreement_score":0.6007715,"about_ca_system_score_codex":0.00032144456,"about_ca_system_score_gemma":0.00028602922,"threshold_uncertainty_score":0.81897765},"labels":[],"label_agreement":null},{"id":"W3044904954","doi":"10.29173/ijic212","title":"Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Rework; Benchmarking; Modular design; Quality (philosophy); Benchmark (surveying); Quality management; Key (lock); Construction management; Engineering; Systems engineering; Process management; Computer science; Construction engineering; Operations management; Business; Civil engineering; Management system","score_opus":0.045777543687967735,"score_gpt":0.28270067444928976,"score_spread":0.23692313076132201,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044904954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9881729,0.00005377335,0.00533062,0.00036591233,0.005475554,0.0002709756,0.00001581418,0.00008108215,0.00023339402],"genre_scores_gemma":[0.994417,0.000014917697,0.003743864,0.00007803749,0.0017130795,0.0000073424453,0.000004706262,0.000018453027,0.0000025641023],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99799585,0.00016183434,0.0009010827,0.00021668167,0.00058909773,0.00013546519],"domain_scores_gemma":[0.998674,0.00009777672,0.00047397477,0.00008786734,0.00051823154,0.00014814634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004036237,0.00020800928,0.0003101151,0.00030786917,0.00010501969,0.00016210013,0.00012867467,0.0001625037,0.00007336202],"category_scores_gemma":[0.00024226992,0.00019569392,0.000105314146,0.00021052487,0.0001155105,0.0004905982,0.00003199298,0.0005699399,0.0000021209125],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012963819,0.0001228966,0.019727128,0.000030726475,0.0010012881,0.0012501384,0.0018571534,0.009916315,0.016703984,0.0058045452,0.00021417206,0.94207525],"study_design_scores_gemma":[0.09220276,0.009995696,0.011804627,0.0014890834,0.0018179377,0.33732784,0.14750613,0.3186555,0.059005886,0.0048365197,0.010416259,0.0049417666],"about_ca_topic_score_codex":0.00008682828,"about_ca_topic_score_gemma":0.000009726231,"teacher_disagreement_score":0.9371335,"about_ca_system_score_codex":0.00016739694,"about_ca_system_score_gemma":0.000115732095,"threshold_uncertainty_score":0.79801667},"labels":[],"label_agreement":null},{"id":"W3044979530","doi":"10.29173/ijic208","title":"Towards Dynamic Vertical Urbanism","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Urbanism; Horizontal and vertical; Landmark; Function (biology); Process (computing); Computer science; Roof; Obstacle; Civil engineering; Architecture; Engineering; Geography; Artificial intelligence","score_opus":0.01942932704328958,"score_gpt":0.24728784148406566,"score_spread":0.22785851444077607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044979530","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7085994,0.00050169235,0.23568524,0.010833716,0.033283066,0.00022841274,0.000044367254,0.00035454737,0.010469569],"genre_scores_gemma":[0.99509025,0.00009555724,0.0032304518,0.0001720392,0.001377753,0.0000020101604,0.000006724115,0.000015901145,0.000009304799],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987351,0.00003787023,0.00059772877,0.00008868121,0.0004350583,0.000105593695],"domain_scores_gemma":[0.9992689,0.000023980738,0.00011706237,0.000053641394,0.00040305094,0.00013334872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001050063,0.0001221889,0.00019556154,0.0001538969,0.000025748857,0.00009128704,0.0002446256,0.00016089137,0.00043723517],"category_scores_gemma":[0.0001753623,0.00011467705,0.00013987582,0.00015750935,0.00007824336,0.00035982116,0.000015766318,0.00042036112,0.000023494855],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007313726,0.000029684928,0.00078332954,0.000011408904,0.00083871756,0.00007358974,0.00042047768,0.0036179526,0.04486523,0.031649027,0.006724567,0.91025466],"study_design_scores_gemma":[0.03378215,0.0013847513,0.0036130277,0.00062656787,0.00077636156,0.012824944,0.0044760494,0.2017167,0.22545041,0.030690994,0.4824408,0.0022172476],"about_ca_topic_score_codex":0.000003661837,"about_ca_topic_score_gemma":8.53471e-7,"teacher_disagreement_score":0.9080374,"about_ca_system_score_codex":0.00016432763,"about_ca_system_score_gemma":0.00011769921,"threshold_uncertainty_score":0.47874185},"labels":[],"label_agreement":null},{"id":"W3080168217","doi":"10.29173/ijic215","title":"Planning semi-automated precast production using GA","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Tardiness; Production planning; Production line; Production (economics); Scheduling (production processes); Schedule; Computer science; Job shop scheduling; Industrial engineering; Real-time computing; Engineering; Operations research; Operations management; Civil engineering; Operating system","score_opus":0.05524105237403548,"score_gpt":0.2919254342536463,"score_spread":0.23668438187961083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3080168217","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8217542,0.00021710947,0.15819342,0.0011786472,0.017470647,0.00015653283,0.000013665558,0.00059768825,0.00041809177],"genre_scores_gemma":[0.94429886,0.000038619975,0.05156627,0.00006714068,0.003979465,0.0000013187577,0.000011832615,0.000028877903,0.0000076248516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987984,0.000046236113,0.00056511257,0.0001030305,0.00038177296,0.000105476975],"domain_scores_gemma":[0.9990427,0.000024847279,0.000307286,0.000049886137,0.00047527422,0.000100001314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017494739,0.00011887627,0.00018533159,0.00020987276,0.000040128045,0.00009714218,0.00017119478,0.00012631594,0.00007718085],"category_scores_gemma":[0.0003724184,0.00012108986,0.00007823593,0.00025566985,0.00003708827,0.00039596908,0.00001492109,0.00033156507,0.0000045152897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015701316,0.000008889983,0.0006930839,0.000005297657,0.00023366271,0.000021495624,0.00031362282,0.97952783,0.008969423,0.000027842565,0.0008683802,0.00917348],"study_design_scores_gemma":[0.0019192655,0.000047764996,0.000053944434,0.00018447037,0.00005954516,0.001090119,0.0006067684,0.9726207,0.021719724,0.00003962947,0.0014852417,0.00017278055],"about_ca_topic_score_codex":0.0000028253883,"about_ca_topic_score_gemma":7.458104e-8,"teacher_disagreement_score":0.12254465,"about_ca_system_score_codex":0.00014446408,"about_ca_system_score_gemma":0.00008511021,"threshold_uncertainty_score":0.49379012},"labels":[],"label_agreement":null},{"id":"W3081146706","doi":"10.29173/ijic220","title":"Feasibility and Implications of the Modular Construction Approach for Rapid Post-Disaster Recovery","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Demolition; Prefabrication; Process (computing); Engineering; Population; Government (linguistics); Disaster recovery; Emergency management; Architectural engineering; Construction engineering; Civil engineering; Risk analysis (engineering); Environmental planning; Forensic engineering; Business; Computer science; Political science; Geography","score_opus":0.039385484879517735,"score_gpt":0.24985082266287503,"score_spread":0.2104653377833573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3081146706","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.781914,0.0003299187,0.20773977,0.003073604,0.0051811826,0.0005950353,0.00024856327,0.000049022317,0.0008688844],"genre_scores_gemma":[0.9817975,0.00011124398,0.017178457,0.00010718717,0.000755773,0.000012561664,0.000018271814,0.000014416765,0.000004578162],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99875456,0.000066879395,0.00071049033,0.00013209847,0.0002465154,0.000089478584],"domain_scores_gemma":[0.9984226,0.00006513978,0.0004607278,0.00011261706,0.00086832844,0.00007054124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020597456,0.00012648763,0.00022947785,0.00012243909,0.000059550053,0.000058346774,0.00022492712,0.00015937549,0.00004660914],"category_scores_gemma":[0.00029440733,0.00010108766,0.00019668425,0.00017202564,0.00021443484,0.0003623571,0.000024420884,0.00026334196,3.0576118e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020060865,0.00007544324,0.017593645,0.00009510872,0.0011462829,6.409529e-7,0.0007238158,0.01057631,0.0994024,0.030611396,0.0017468464,0.836022],"study_design_scores_gemma":[0.09190005,0.0037957826,0.09069904,0.0014521866,0.003543436,0.01805677,0.03637007,0.15684944,0.38563547,0.12455604,0.082811624,0.004330098],"about_ca_topic_score_codex":0.0000049543305,"about_ca_topic_score_gemma":9.92976e-7,"teacher_disagreement_score":0.8316919,"about_ca_system_score_codex":0.0001112285,"about_ca_system_score_gemma":0.00011022408,"threshold_uncertainty_score":0.4122235},"labels":[],"label_agreement":null},{"id":"W3121454488","doi":"10.29173/ijic235","title":"Integrating machine learning with QFD for selecting functional requirements in construction automation","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"Quality Function Deployment in Product Design","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Functional requirement; Quality function deployment; Computer science; Non-functional requirement; Artificial intelligence; Requirements analysis; Software deployment; Machine learning; Function (biology); Systems engineering; Software engineering; Engineering; Software development; Software; Operations management","score_opus":0.07803071109161068,"score_gpt":0.2777405599418103,"score_spread":0.1997098488501996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121454488","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61099553,0.000060616152,0.3600783,0.01585923,0.01024655,0.0010200014,0.000010919443,0.00026719877,0.0014616203],"genre_scores_gemma":[0.9699226,0.000009511339,0.021736419,0.0009539256,0.007176918,0.000025745749,0.00009733476,0.000043123844,0.000034440982],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99754,0.000081774146,0.0011170446,0.00027954267,0.0007850405,0.00019657536],"domain_scores_gemma":[0.9963673,0.00015478184,0.0018969205,0.00006640028,0.0014854764,0.000029130422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012263631,0.00020973211,0.00032056007,0.00068159,0.00015095697,0.0003818738,0.00022857249,0.00012879528,0.00024445663],"category_scores_gemma":[0.0025639476,0.00019195514,0.00011870811,0.0006628848,0.00008260244,0.0022853918,0.000042978212,0.00057324703,0.000010132065],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.021437392,0.00035057138,0.4750464,0.00022917724,0.0016557887,0.000058084068,0.0007242261,0.03772341,0.035619617,0.08251553,0.0042144214,0.34042537],"study_design_scores_gemma":[0.1295153,0.0028953745,0.013297613,0.0038964397,0.0017807541,0.0037358217,0.023909887,0.42075816,0.02867588,0.039685827,0.32761896,0.004229981],"about_ca_topic_score_codex":0.00008802274,"about_ca_topic_score_gemma":0.000015554642,"teacher_disagreement_score":0.46174878,"about_ca_system_score_codex":0.00026665002,"about_ca_system_score_gemma":0.00016811266,"threshold_uncertainty_score":0.78277034},"labels":[],"label_agreement":null},{"id":"W3122925454","doi":"10.29173/ijic236","title":"Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Nevada, Las Vegas","keywords":"Schedule; Virtual reality; Modular design; Computer science; Plan (archaeology); Systems engineering; Engineering management; Construction engineering; Human–computer interaction; Engineering; Operating system","score_opus":0.023343636918016084,"score_gpt":0.288660164596957,"score_spread":0.26531652767894087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122925454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9156186,0.00007321625,0.081252225,0.00021965856,0.002392026,0.00016220385,0.000066659864,0.000027956929,0.00018746081],"genre_scores_gemma":[0.99660236,0.00008986857,0.0026885003,0.000022161861,0.0005147622,0.000008476616,0.000053371958,0.000015594534,0.000004897393],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984922,0.00013390923,0.0007120792,0.00016828829,0.00038874694,0.000104816456],"domain_scores_gemma":[0.9982779,0.00006341734,0.00044136462,0.00015200188,0.000985155,0.00008015929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030549988,0.0001528386,0.00026706388,0.0002869811,0.00007037621,0.00008879077,0.00012404058,0.0002181044,0.0000352536],"category_scores_gemma":[0.0001442492,0.00015382683,0.00009180022,0.00023854297,0.00014652459,0.00044860228,0.000019548721,0.0003746405,9.632029e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021750957,0.00035691427,0.0026655397,0.00003808664,0.0013114847,0.00047754828,0.0006590014,0.016040917,0.14299473,0.2540948,0.00023993419,0.57894593],"study_design_scores_gemma":[0.021808416,0.0018954725,0.0010270039,0.0005753829,0.0005544426,0.039301354,0.016402172,0.1406301,0.7540347,0.017218824,0.0055084946,0.0010436464],"about_ca_topic_score_codex":0.00009595897,"about_ca_topic_score_gemma":0.000023945675,"teacher_disagreement_score":0.61103994,"about_ca_system_score_codex":0.00016642231,"about_ca_system_score_gemma":0.00023125108,"threshold_uncertainty_score":0.62728757},"labels":[],"label_agreement":null},{"id":"W3189873253","doi":"10.29173/ijic249","title":"Overview of the Characteristics of the Modular Industry and Barriers to its Increased Market Share","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Context (archaeology); Work (physics); Engineering; Construction management; Business; Engineering management; Operations management; Civil engineering; Marketing; Computer science","score_opus":0.0198415928146441,"score_gpt":0.24666073306717726,"score_spread":0.22681914025253316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3189873253","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9926932,0.00024494817,0.00019595632,0.00080861547,0.0052638967,0.000106448424,0.00016370411,0.00000740375,0.0005158652],"genre_scores_gemma":[0.9991577,0.00012200345,0.00024580976,0.0000840207,0.00032462683,0.0000024673807,0.0000026547343,0.000009294813,0.000051376457],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986451,0.00013029038,0.0006494723,0.000078033445,0.00042402695,0.00007306746],"domain_scores_gemma":[0.9983926,0.000051217237,0.0004432389,0.00013632275,0.0008919655,0.00008470312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023113293,0.000103620056,0.00022163204,0.00010945515,0.0000427611,0.000038327715,0.00026236987,0.00021558332,0.00060358533],"category_scores_gemma":[0.0009563626,0.0000731929,0.00013485095,0.0002833069,0.00008787813,0.00015661608,0.00006169877,0.0004712822,3.1787815e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012433982,0.00010602455,0.24056384,0.00027134828,0.0031368546,0.00003421942,0.0011142762,0.0027776773,0.3112672,0.03227862,0.009944753,0.3972618],"study_design_scores_gemma":[0.008383782,0.00012920405,0.25191128,0.004594459,0.0006097397,0.0046172007,0.0036643352,0.0046822033,0.6713302,0.0028978076,0.046523735,0.0006560547],"about_ca_topic_score_codex":0.000011389431,"about_ca_topic_score_gemma":0.0000042035194,"teacher_disagreement_score":0.39660573,"about_ca_system_score_codex":0.0000895951,"about_ca_system_score_gemma":0.00031160444,"threshold_uncertainty_score":0.6608836},"labels":[],"label_agreement":null},{"id":"W3192315988","doi":"10.29173/ijic252","title":"Construction stakeholders’ perceived benefits and barriers for environment-friendly modular construction in a hospitality centric environment","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Business; Sustainability; Hospitality; Process management; Documentation; Quality (philosophy); Marketing; Operations management; Engineering management; Engineering; Tourism; Computer science","score_opus":0.022736039882881972,"score_gpt":0.216109268364984,"score_spread":0.19337322848210203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3192315988","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96427774,0.00080390327,0.027485648,0.00049919053,0.006198943,0.000333506,0.00014668173,0.000045116583,0.00020927716],"genre_scores_gemma":[0.96854377,0.0026661488,0.027909288,0.000029931278,0.00070126023,0.000031648673,0.000067700064,0.00003501358,0.000015264248],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9977146,0.00012459353,0.0010660888,0.00031013068,0.0005312281,0.00025339655],"domain_scores_gemma":[0.99881315,0.00008432874,0.00045005666,0.00015800669,0.00030945768,0.0001849821],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033781448,0.00027158114,0.00039900304,0.00047284862,0.00010188151,0.00015140326,0.00016079757,0.00033118526,0.000329185],"category_scores_gemma":[0.00020494808,0.0003001801,0.00018348866,0.00018274624,0.00030877237,0.0006700749,0.000031995776,0.00045337676,0.0000024137257],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006927287,0.00008015706,0.03059403,0.000037607966,0.0008252169,0.000054053467,0.00051985343,0.029214084,0.020311838,0.024592336,0.00023573074,0.89284235],"study_design_scores_gemma":[0.14870253,0.002707848,0.10184008,0.0033375728,0.0027614497,0.054661885,0.13664421,0.080075674,0.22381943,0.07921318,0.15845303,0.0077830884],"about_ca_topic_score_codex":0.000015644473,"about_ca_topic_score_gemma":0.0000060097595,"teacher_disagreement_score":0.8850593,"about_ca_system_score_codex":0.00064729655,"about_ca_system_score_gemma":0.00018323457,"threshold_uncertainty_score":0.99994504},"labels":[],"label_agreement":null},{"id":"W3203069032","doi":"10.29173/ijic253","title":"Using 3D Scanning for Accurate Estimation of Termination Points for Dimensional Quality Assurance in Pipe Spool Fabrication","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Quality assurance; Rework; Modular programming; Laser tracker; Fabrication; Software; Computer science; Point (geometry); Modular design; Engineering; Engineering drawing; Laser; Embedded system","score_opus":0.09624496190875237,"score_gpt":0.3584578676202284,"score_spread":0.26221290571147604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203069032","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94083565,0.00007335359,0.055874392,0.0002974429,0.002509916,0.00018555167,0.0001718304,0.0000052738474,0.00004659472],"genre_scores_gemma":[0.9368596,0.000009235172,0.06259761,0.0000256753,0.00031378577,0.0000017012039,0.00017308435,0.0000028705629,0.000016457436],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99837613,0.00018870912,0.0008235313,0.00013410089,0.0003706254,0.0001069189],"domain_scores_gemma":[0.99701226,0.00049968774,0.0009948942,0.000054836062,0.0014006696,0.000037672427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012001414,0.000089081754,0.00023205153,0.00016722627,0.000062050625,0.000057737736,0.0001211189,0.00010420901,0.000087270455],"category_scores_gemma":[0.0021476885,0.00008233457,0.00010850776,0.00018436238,0.00004583964,0.0005691364,0.0000054241536,0.00011782407,5.4505387e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002437136,0.00007991055,0.18257019,0.00005698867,0.00017273345,0.000009773025,0.00026978803,0.122168966,0.016282184,0.00038440828,0.0001368086,0.67543113],"study_design_scores_gemma":[0.013016907,0.00028549074,0.47354597,0.0011689775,0.00012354468,0.00062494015,0.0011580593,0.46252596,0.038253434,0.00809604,0.0007177228,0.00048296506],"about_ca_topic_score_codex":0.00019243831,"about_ca_topic_score_gemma":0.00011276867,"teacher_disagreement_score":0.67494816,"about_ca_system_score_codex":0.000053928958,"about_ca_system_score_gemma":0.00029935237,"threshold_uncertainty_score":0.33575064},"labels":[],"label_agreement":null}]}