{"meta":{"query_hash":"e105162c7f95","filters":{"venue":"International Journal of Planning and Scheduling"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/e105162c7f95","api":"https://metacan.xera.ac/api/v1/cohort?venue=International+Journal+of+Planning+and+Scheduling"},"results":[{"id":"W2083859858","doi":"10.1504/ijps.2011.044546","title":"Inter-domain translational research on planning and scheduling: operating rooms vs. job shops","year":2011,"lang":"en","type":"article","venue":"International Journal of Planning and Scheduling","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Industrial engineering; Translational research; Field (mathematics); Operations research; Operations management; Engineering; Mathematics; Medicine","score_opus":0.08679686363456976,"score_gpt":0.3415164192481073,"score_spread":0.25471955561353754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083859858","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22247559,0.051617146,0.55670166,0.05101778,0.0020183153,0.00037717936,0.00063223595,0.00019757255,0.1149625],"genre_scores_gemma":[0.8823423,0.025126506,0.08505003,0.002447728,0.0010516649,0.00019624438,0.00033230908,0.000095899064,0.003357485],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9938471,0.0045693396,0.00016875347,0.00061436626,0.00059293804,0.00020757288],"domain_scores_gemma":[0.9510791,0.040939018,0.0018132488,0.00285071,0.0022157144,0.001102143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011687875,0.00069042994,0.0009693598,0.0011529262,0.00092349685,0.004227292,0.002191469,0.0017662445,0.008211673],"category_scores_gemma":[0.02446688,0.00046982488,0.000724476,0.0024552026,0.005149202,0.0076599675,0.0019319896,0.0033374715,0.0007781906],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006672186,0.0010929785,0.0062752417,0.0015410956,0.000111491674,0.00015769879,0.0014645412,0.06274302,0.0017676483,0.69945467,0.0031669072,0.22155753],"study_design_scores_gemma":[0.00010198972,0.00081582944,0.006221927,0.0008263114,0.00005900174,0.0001579753,0.0071394457,0.106464565,0.0021248732,0.8465074,0.029514816,0.00006589751],"about_ca_topic_score_codex":0.0021672847,"about_ca_topic_score_gemma":0.0016295523,"teacher_disagreement_score":0.011687875,"about_ca_system_score_codex":0.0027989566,"about_ca_system_score_gemma":0.0030007216,"threshold_uncertainty_score":0.061812103},"labels":[],"label_agreement":null},{"id":"W2285536374","doi":"10.1504/ijps.2015.072107","title":"Mine production scheduling for poly-metallic mineral deposits: extension to multiple processes","year":2015,"lang":"en","type":"article","venue":"International Journal of Planning and Scheduling","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Heuristics; Scheduling (production processes); Block (permutation group theory); Computer science; Sequence (biology); Mathematical optimization; Extension (predicate logic); Mathematics; Chemistry","score_opus":0.04702184344644901,"score_gpt":0.2886992622629689,"score_spread":0.24167741881651988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2285536374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19373216,0.00029068612,0.80202,0.00013536739,0.00003660045,0.0002799474,0.00010524752,0.00023635659,0.0031636471],"genre_scores_gemma":[0.791706,0.00022404887,0.20514582,0.00002287156,0.000019483652,0.00018198913,0.00009604486,0.000032749253,0.002570979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996209,0.00007864976,0.000021220245,0.00009932672,0.00010406085,0.00007585836],"domain_scores_gemma":[0.9993685,0.00033760056,0.000104649924,0.00006168878,0.0000789007,0.00004878872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061485154,0.0005573,0.00091923564,0.00043591473,0.00047407253,0.00074334396,0.0011694123,0.0006796609,0.0021276788],"category_scores_gemma":[0.0009526772,0.0004163762,0.00092415354,0.0008416429,0.00042222947,0.00066009257,0.0008503044,0.0008522751,0.00018717478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016775614,0.00014681667,0.001343803,0.00016012439,0.00003227356,0.00037854305,0.00008147487,0.9404598,0.0071761752,0.0034918196,0.0001996109,0.04636179],"study_design_scores_gemma":[0.000016159294,0.00010929011,0.0004952217,0.0000036265865,0.00001250827,0.0000734005,0.00001782435,0.99521184,0.0014607607,0.0019199778,0.00067244633,0.000006921577],"about_ca_topic_score_codex":0.0053983675,"about_ca_topic_score_gemma":0.0054992875,"teacher_disagreement_score":0.0053983675,"about_ca_system_score_codex":0.0006590111,"about_ca_system_score_gemma":0.0016233728,"threshold_uncertainty_score":0.010733902},"labels":[],"label_agreement":null}]}