{"meta":{"query_hash":"37d181f9e975","filters":{"venue":"Jiegou Gongchengshi"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/37d181f9e975","api":"https://metacan.xera.ac/api/v1/cohort?venue=Jiegou+Gongchengshi"},"results":[{"id":"W2351263654","doi":"","title":"Developments of Research on Built-up Timber Members in Wood-Frame Constructions","year":2010,"lang":"en","type":"article","venue":"Jiegou Gongchengshi","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Frame (networking); Engineering; Architectural engineering; Civil engineering; Portfolio; Construction engineering; Business; Mechanical engineering","score_opus":0.03318423736540126,"score_gpt":0.325461413736244,"score_spread":0.2922771763708427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2351263654","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12260568,0.057392895,0.7254432,0.00043922305,0.00045887427,0.00007395486,0.00006953661,0.00015815195,0.093358554],"genre_scores_gemma":[0.7442865,0.07204597,0.16169901,0.00012996451,0.00052984216,0.00007016551,0.00015620957,0.000097209966,0.020985054],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99928254,0.00021614984,0.000029770972,0.00017118163,0.00024098798,0.000059379792],"domain_scores_gemma":[0.9992034,0.00048306052,0.0000622172,0.00006579191,0.00015770696,0.000027864024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071963866,0.0006371685,0.000603695,0.0010283133,0.00061958027,0.00090997753,0.00088541716,0.000801791,0.0035294252],"category_scores_gemma":[0.0010845187,0.00051644555,0.00050973945,0.0012186639,0.0014187024,0.0021894292,0.00054778514,0.00070143305,0.0007164474],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095819305,0.0001849964,0.006922083,0.0028143006,0.000059631548,0.00094182923,0.0037381847,0.06823132,0.024650231,0.4220892,0.0019107955,0.4683616],"study_design_scores_gemma":[0.000026459325,0.00093894795,0.018640865,0.0026848079,0.00020984485,0.0025542562,0.006263466,0.19679603,0.04850883,0.19451407,0.528623,0.00023947239],"about_ca_topic_score_codex":0.0011837673,"about_ca_topic_score_gemma":0.0019126894,"teacher_disagreement_score":0.0035294252,"about_ca_system_score_codex":0.00074602896,"about_ca_system_score_gemma":0.000624745,"threshold_uncertainty_score":0.011807144},"labels":[],"label_agreement":null},{"id":"W2361611559","doi":"","title":"Live Load and Its Response of Highway Bridges Based on International and Domestic Design Codes","year":2008,"lang":"en","type":"article","venue":"Jiegou Gongchengshi","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Culvert; Bridge (graph theory); Engineering; Structural load; Current (fluid); Design load; Transport engineering; China; Civil engineering; Structural engineering; Geography; Electrical engineering","score_opus":0.013697145515412675,"score_gpt":0.21507771712911153,"score_spread":0.20138057161369885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2361611559","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9722549,0.00009680828,0.008979379,0.0000690162,0.000031845382,0.0000143960615,0.00020625448,0.00010332299,0.018244047],"genre_scores_gemma":[0.99815947,0.000028537857,0.00024080898,0.0000073511924,0.0000043870778,0.000006086372,0.00015293123,0.000013363095,0.0013870855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99941707,0.00010911935,0.00002341701,0.00006331505,0.00026961492,0.00011747842],"domain_scores_gemma":[0.99892044,0.00030323502,0.00013845957,0.000073791736,0.00050304533,0.000061093066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036814963,0.00031029442,0.00014553817,0.0012879021,0.00020131968,0.00036136038,0.0002586416,0.00031295398,0.0018403648],"category_scores_gemma":[0.001885672,0.00010403907,0.00023021766,0.00075708656,0.0003034799,0.0003961454,0.00044028927,0.00023123533,0.00046609994],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020844734,0.0001938375,0.19784315,0.00024073572,0.00010318069,0.0009537841,0.0019026019,0.49223143,0.09887605,0.0126799485,0.006866696,0.18602405],"study_design_scores_gemma":[0.000040835137,0.00108543,0.46168786,0.000061054416,0.000091053014,0.00061596715,0.0037484816,0.45690396,0.061199453,0.0051588737,0.0092612,0.00014585073],"about_ca_topic_score_codex":0.00277918,"about_ca_topic_score_gemma":0.002932593,"teacher_disagreement_score":0.00277918,"about_ca_system_score_codex":0.00047312133,"about_ca_system_score_gemma":0.0001616643,"threshold_uncertainty_score":0.0061566234},"labels":[],"label_agreement":null}]}