{"meta":{"query_hash":"7faec8dcfbdd","filters":{"venue":"Journal of Construction Engineering"},"cohort_total":6,"direct_labels_cover":0,"predictions_cover":6,"exported":6,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/7faec8dcfbdd","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Construction+Engineering"},"results":[{"id":"W1689201003","doi":"10.1155/2015/752674","title":"Development of the Asphalt Multi-Integrated Roller Field and Experimental Studies","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"Asphalt Pavement Performance Evaluation","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; Stantec (Canada)","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; Ministère des Transports; Carleton University","keywords":"Asphalt; Engineering; Civil engineering; Compaction; Asphalt pavement; Work (physics); Sight; Forensic engineering; Mechanical engineering; Geotechnical engineering","score_opus":0.042726142128421706,"score_gpt":0.28138574616279655,"score_spread":0.23865960403437483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1689201003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9722697,0.0015706175,0.024651898,0.000017895138,0.0013745222,0.000062202125,2.736532e-7,0.000020224286,0.00003264825],"genre_scores_gemma":[0.9502574,0.000028653976,0.049630765,0.000005029113,0.00005810301,0.0000025007746,1.5877526e-7,0.000008487703,0.000008890826],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993007,0.00000829505,0.00037900987,0.000037280905,0.00019790215,0.00007678629],"domain_scores_gemma":[0.99963015,0.000020031426,0.00010928069,0.000051395575,0.0001467512,0.000042377458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025292562,0.00008587278,0.00014893977,0.00008916605,0.000024228992,0.000007355175,0.00005830845,0.000032538013,0.0000072672215],"category_scores_gemma":[0.000067186724,0.00006248686,0.000026670872,0.000103675964,0.000020065612,0.00020002665,0.000018629595,0.0001229128,5.8048e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054215394,0.00004335803,0.0067686555,0.00018980252,0.0006587797,0.0000034269135,0.0109386165,0.7741401,0.17439125,0.00011363049,0.00045385468,0.032244276],"study_design_scores_gemma":[0.0017837507,0.00007446131,0.0028899414,0.00026730512,0.000038227125,0.0001752742,0.006504634,0.17858693,0.80783975,0.0000061944356,0.001665667,0.00016785531],"about_ca_topic_score_codex":3.1325328e-7,"about_ca_topic_score_gemma":6.843095e-7,"teacher_disagreement_score":0.63344854,"about_ca_system_score_codex":0.00012322018,"about_ca_system_score_gemma":0.000048525635,"threshold_uncertainty_score":0.25481403},"labels":[],"label_agreement":null},{"id":"W1999129289","doi":"10.1155/2014/847430","title":"Hybrid Simulation Environment for Construction Projects: Identification of System Design Criteria","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Schedule; Identification (biology); Process (computing); Systems engineering; Computer science; Simulation modeling; Risk analysis (engineering); Modeling and simulation; System lifecycle; Process management; Engineering; Software engineering; Application lifecycle management; Software","score_opus":0.011200375293203455,"score_gpt":0.2072075331829719,"score_spread":0.19600715788976844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999129289","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.090242155,0.00009928097,0.906987,0.000007509517,0.002302821,0.00022274032,0.000009335354,0.000092877766,0.000036239348],"genre_scores_gemma":[0.8968315,0.000019035113,0.10278127,0.0000012364101,0.00031779354,0.000015882373,0.000004826567,0.000025357822,0.000003097081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985733,0.000038194383,0.0009455872,0.00010554594,0.00020849574,0.00012887831],"domain_scores_gemma":[0.99900997,0.00012229427,0.0004384239,0.00013072469,0.00024381558,0.000054760225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048672894,0.00015357479,0.00027091816,0.00033898695,0.000047110145,0.00003844441,0.000081908365,0.00008349887,0.000012201631],"category_scores_gemma":[0.00006598062,0.00015992459,0.00010480661,0.0000952037,0.000047471614,0.00040309847,0.000004646567,0.00012562914,0.0000021746393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028252538,0.000005539984,0.000028478453,0.00026277392,0.00004492498,2.5754386e-7,0.0000435883,0.80584216,0.14929481,0.0031306574,0.00001832755,0.041300245],"study_design_scores_gemma":[0.00046985102,0.00009107427,0.00010800708,0.00012838661,0.00007224614,0.0004203129,0.00017565227,0.78987366,0.20689087,0.0001790838,0.0014576392,0.0001332434],"about_ca_topic_score_codex":4.740851e-7,"about_ca_topic_score_gemma":3.5592084e-8,"teacher_disagreement_score":0.80658937,"about_ca_system_score_codex":0.00017145714,"about_ca_system_score_gemma":0.000023819548,"threshold_uncertainty_score":0.65215355},"labels":[],"label_agreement":null},{"id":"W2041663300","doi":"10.1155/2014/703084","title":"Motivating Workers in Construction","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Productivity; Incentive; Employee motivation; Empowerment; Knowledge management; Work (physics); Knowledge worker; Business; Key (lock); Marketing; Public relations; Engineering; Computer science; Economics; Political science; Economic growth","score_opus":0.026930809230661257,"score_gpt":0.3794471159201871,"score_spread":0.3525163066895258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041663300","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93328816,0.00004843516,0.06024088,0.0005093121,0.0026916484,0.00018142178,0.0000011203495,0.000025566884,0.0030134853],"genre_scores_gemma":[0.96893585,0.000023718832,0.03022134,0.000040500527,0.00073294534,0.0000070440938,9.836045e-7,0.000012189949,0.000025410507],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983475,0.00017637288,0.0008146627,0.000080156926,0.00028440566,0.00029686262],"domain_scores_gemma":[0.99833655,0.0008168649,0.00034693105,0.00008016344,0.00027745534,0.0001420233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001413501,0.000082106584,0.00022419308,0.00044499786,0.00013972304,0.0000059784425,0.00007949129,0.00011310091,0.0001463554],"category_scores_gemma":[0.001271497,0.000076725184,0.000050526007,0.00036165814,0.00003502264,0.0002326872,0.000017418228,0.0009053956,0.000018305524],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000101835176,0.0000093816,0.9140896,0.00018250433,0.0000126266095,0.000003441075,0.00017910475,0.013469542,0.0004988132,0.006102324,0.00008745038,0.06526338],"study_design_scores_gemma":[0.0023852624,0.00014174756,0.95738894,0.00114244,0.000009130532,0.00025528576,0.0024853565,0.027047409,0.00009738539,0.00086091424,0.00800649,0.00017963401],"about_ca_topic_score_codex":0.000028721532,"about_ca_topic_score_gemma":0.0000059159424,"teacher_disagreement_score":0.06508375,"about_ca_system_score_codex":0.00021361544,"about_ca_system_score_gemma":0.0002816978,"threshold_uncertainty_score":0.3933544},"labels":[],"label_agreement":null},{"id":"W2157838605","doi":"10.1155/2014/672896","title":"An Automated BIM Model to Conceptually Design, Analyze, Simulate, and Assess Sustainable Building Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Embodied energy; Sustainability; Energy consumption; Certification; Systems engineering; Environmental design; Energy modeling; Building design; Conceptual design; Sustainable design; Architectural engineering; Design tool; Computer science; Life-cycle assessment; Engineering; Civil engineering; Operations management; Production (economics); Human–computer interaction","score_opus":0.012402703447853028,"score_gpt":0.2478339491887843,"score_spread":0.23543124574093127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157838605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36910918,0.000045228837,0.63009775,0.0000147812025,0.0003040074,0.00008490287,6.1113764e-7,0.00027819397,0.00006535101],"genre_scores_gemma":[0.8495319,0.000014356605,0.15026477,0.000012296487,0.00013551272,0.0000046050195,5.2839096e-7,0.000028510467,0.0000075044672],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989727,0.000028517568,0.00044259703,0.00012460431,0.00018728683,0.00024425474],"domain_scores_gemma":[0.99917614,0.0000633544,0.00010482334,0.00011757894,0.000344691,0.00019341768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036488147,0.00018211865,0.00026269633,0.0005338101,0.000079919766,0.00014102524,0.00010696718,0.0001068772,0.00000712121],"category_scores_gemma":[0.00010364959,0.00018134256,0.00004752855,0.00036762055,0.000030284293,0.0007969233,0.000011443002,0.00022974575,7.829661e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015693377,0.0000048148554,0.00013690743,0.00005258723,0.000041871128,0.0000040126897,0.00014255056,0.9641034,0.021835204,0.010225259,0.000045242596,0.0033924468],"study_design_scores_gemma":[0.00036016066,0.00012697084,0.00021647861,0.00007022061,0.000032619533,0.00038892642,0.0003243042,0.9902655,0.0072930832,0.00030025904,0.00042435044,0.0001971256],"about_ca_topic_score_codex":0.000002615015,"about_ca_topic_score_gemma":7.5877966e-7,"teacher_disagreement_score":0.48042274,"about_ca_system_score_codex":0.00011643011,"about_ca_system_score_gemma":0.000055194225,"threshold_uncertainty_score":0.73949355},"labels":[],"label_agreement":null},{"id":"W2180715974","doi":"10.1155/2015/579486","title":"An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Schedule; Building information modeling; Earned value management; Project management; Process (computing); Project planning; Construction management; Pre-construction services; Systems engineering; Cost estimate; Project management triangle; Track (disk drive); Computer science; Engineering management; Engineering; Operations management; Scheduling (production processes); Project charter; Civil engineering","score_opus":0.012136623610980522,"score_gpt":0.22200720299923216,"score_spread":0.20987057938825163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180715974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93174005,0.000107987405,0.06614727,0.000018486304,0.0014059221,0.00035933685,0.000009243438,0.00012516642,0.00008655985],"genre_scores_gemma":[0.9899336,0.0000054107613,0.009826134,0.000003119464,0.00019262123,0.000011560296,0.0000010171705,0.000023183471,0.0000033491315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987966,0.00006341565,0.00065214245,0.00010879368,0.00024335306,0.00013572583],"domain_scores_gemma":[0.9989426,0.000041282296,0.00018512222,0.00016064628,0.00048730822,0.00018305294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048516676,0.00017666823,0.00030241834,0.00040028576,0.00005164209,0.0000741131,0.00009866909,0.000081706334,0.0000076297],"category_scores_gemma":[0.000059018366,0.00013416455,0.00005171111,0.0004755606,0.000066494424,0.00044327424,0.000009307252,0.00029176852,0.0000022930462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022667497,0.00012163658,0.006077777,0.00027222236,0.0006489487,0.00048687236,0.008883253,0.7639942,0.021156026,0.003153908,0.00025091713,0.19472754],"study_design_scores_gemma":[0.002947076,0.0013188764,0.00085947954,0.0004371593,0.00034909346,0.21660896,0.19783309,0.5708825,0.00627191,0.000030066602,0.0018909374,0.0005708518],"about_ca_topic_score_codex":0.000050018934,"about_ca_topic_score_gemma":0.00001161372,"teacher_disagreement_score":0.21612209,"about_ca_system_score_codex":0.00015820866,"about_ca_system_score_gemma":0.000080956685,"threshold_uncertainty_score":0.54710716},"labels":[],"label_agreement":null},{"id":"W2504132119","doi":"10.1155/2016/2312057","title":"An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Scheduling (production processes); Schedule; Operations research; Parametric statistics; Randomness; Conceptual design; Industrial engineering; Engineering; Computer science; Systems engineering; Operations management","score_opus":0.008098464830622399,"score_gpt":0.21725553795565705,"score_spread":0.20915707312503465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2504132119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18924364,0.00020567466,0.80730206,0.00005431229,0.002833834,0.000086403874,0.000009444062,0.00023330771,0.00003133677],"genre_scores_gemma":[0.82687,0.000044798548,0.17224534,0.000005493917,0.00077869906,0.000012373694,0.0000020231514,0.000033122767,0.000008137043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989856,0.000016884313,0.0005719762,0.000101800455,0.0001460548,0.00017767829],"domain_scores_gemma":[0.9992273,0.000053747102,0.0000775486,0.00012642435,0.00039091156,0.00012407501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020717959,0.0001619194,0.0002274953,0.00031075816,0.00008238066,0.000063026884,0.00010664116,0.000111511115,0.000026367252],"category_scores_gemma":[0.00006806949,0.00012217458,0.000116637086,0.00017324623,0.000029309751,0.0008211626,0.000003841522,0.00016215336,0.000003704678],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034864937,0.000009378291,0.00009898838,0.00006563902,0.00010331975,0.000003392537,0.00012537396,0.5820675,0.3043192,0.008039973,0.000036649806,0.10509571],"study_design_scores_gemma":[0.0011869033,0.00014904533,0.000085953434,0.0007455617,0.00003968786,0.0017483946,0.0012636462,0.85036653,0.13517112,0.000027621652,0.008878131,0.00033740807],"about_ca_topic_score_codex":0.0000023145612,"about_ca_topic_score_gemma":0.0000024831684,"teacher_disagreement_score":0.6376264,"about_ca_system_score_codex":0.00018714672,"about_ca_system_score_gemma":0.00006136889,"threshold_uncertainty_score":0.49821347},"labels":[],"label_agreement":null}]}