{"meta":{"query_hash":"7faec8dcfbdd","filters":{"venue":"Journal of Construction Engineering"},"cohort_total":6,"direct_labels_cover":0,"predictions_cover":6,"exported":6,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/7faec8dcfbdd","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Construction+Engineering"},"results":[{"id":"W1689201003","doi":"10.1155/2015/752674","title":"Development of the Asphalt Multi-Integrated Roller Field and Experimental Studies","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"Asphalt Pavement Performance Evaluation","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; Stantec (Canada)","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; Ministère des Transports; Carleton University","keywords":"Asphalt; Engineering; Civil engineering; Compaction; Asphalt pavement; Work (physics); Sight; Forensic engineering; Mechanical engineering; Geotechnical engineering","score_opus":0.042726142128421706,"score_gpt":0.28138574616279655,"score_spread":0.23865960403437483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1689201003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9580027,0.00041575907,0.03168308,0.00006062536,0.0000298578,0.0017942217,0.0012608448,0.00044981227,0.0063030724],"genre_scores_gemma":[0.9195816,0.00076991494,0.0680798,0.000069088186,0.000038186627,0.0012697675,0.0015253638,0.00006495436,0.0086014],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989197,0.00014373499,0.000057071193,0.0002516942,0.00046625617,0.00016167248],"domain_scores_gemma":[0.9990069,0.00014663555,0.0001338362,0.00024147311,0.00035284422,0.000118324366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015605689,0.0007379256,0.00055414287,0.0013898093,0.0008796825,0.00046902074,0.0010424833,0.0006428754,0.0034275348],"category_scores_gemma":[0.0007810493,0.00033560456,0.00037557178,0.0009208074,0.00061892753,0.00082878646,0.0004684332,0.0007969551,0.00073992263],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008998545,0.005648457,0.007202545,0.00036490973,0.00002987086,0.00031693993,0.00072144443,0.0043678833,0.9358111,0.0015947437,0.00049308856,0.04254908],"study_design_scores_gemma":[0.00033448247,0.028482348,0.06400109,0.000056133802,0.00013799666,0.0003936062,0.0008819027,0.00872632,0.8752526,0.0006371922,0.020974226,0.00012208511],"about_ca_topic_score_codex":0.012157296,"about_ca_topic_score_gemma":0.020260269,"teacher_disagreement_score":0.012157296,"about_ca_system_score_codex":0.0010253945,"about_ca_system_score_gemma":0.0008128897,"threshold_uncertainty_score":0.02417308},"labels":[],"label_agreement":null},{"id":"W1999129289","doi":"10.1155/2014/847430","title":"Hybrid Simulation Environment for Construction Projects: Identification of System Design Criteria","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Schedule; Identification (biology); Process (computing); Systems engineering; Computer science; Simulation modeling; Risk analysis (engineering); Modeling and simulation; System lifecycle; Process management; Engineering; Software engineering; Application lifecycle management; Software","score_opus":0.011200375293203455,"score_gpt":0.2072075331829719,"score_spread":0.19600715788976844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999129289","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043952156,0.000069087946,0.94897795,0.00010636463,0.000011498932,0.00019835478,0.00010866281,0.00041766572,0.0061582937],"genre_scores_gemma":[0.6464239,0.00017412294,0.34937945,0.000033457534,0.000012498447,0.00093319366,0.0002424962,0.00013515636,0.0026657658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984181,0.0008862283,0.00006908278,0.000100190315,0.00041573856,0.00011072768],"domain_scores_gemma":[0.99740016,0.0017802829,0.0001988237,0.00013177752,0.00039145313,0.000097586584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027128393,0.00076733995,0.00072839117,0.0008661741,0.00058406283,0.0018315582,0.0007822656,0.0009309567,0.0032585955],"category_scores_gemma":[0.0054826564,0.000486614,0.000624044,0.0006000223,0.0006351785,0.0013269502,0.0019847448,0.000646531,0.00040200207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013254295,0.00007428854,0.0017651969,0.00008794111,0.000027316693,0.00009801525,0.00018176748,0.9428797,0.0032591573,0.036889624,0.00036221318,0.014242305],"study_design_scores_gemma":[0.00001302309,0.00003500142,0.00014282859,0.000012025359,0.0000047790622,0.000014747639,0.000030237057,0.9942795,0.0007206472,0.0036196632,0.0011212914,0.0000062115496],"about_ca_topic_score_codex":0.0019925304,"about_ca_topic_score_gemma":0.0018139239,"teacher_disagreement_score":0.0032585955,"about_ca_system_score_codex":0.00085084134,"about_ca_system_score_gemma":0.0015273403,"threshold_uncertainty_score":0.014347076},"labels":[],"label_agreement":null},{"id":"W2041663300","doi":"10.1155/2014/703084","title":"Motivating Workers in Construction","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Productivity; Incentive; Employee motivation; Empowerment; Knowledge management; Work (physics); Knowledge worker; Business; Key (lock); Marketing; Public relations; Engineering; Computer science; Economics; Political science; Economic growth","score_opus":0.026930809230661257,"score_gpt":0.3794471159201871,"score_spread":0.3525163066895258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041663300","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9549054,0.007187959,0.0019248755,0.006878689,0.00026608474,0.00020226953,0.000026741025,0.00003100253,0.028577086],"genre_scores_gemma":[0.99085957,0.0027958644,0.001124124,0.00083374575,0.00008768487,0.00011980918,0.000015903235,0.0000075860507,0.0041557825],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9960679,0.0022675036,0.0000847115,0.000188054,0.0007976049,0.00059432135],"domain_scores_gemma":[0.99641174,0.0015511059,0.00058161176,0.000097483826,0.0003830057,0.000975215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052297222,0.0001945108,0.00024832808,0.0009794105,0.0030980175,0.0035200787,0.0006309728,0.0015949946,0.0022438564],"category_scores_gemma":[0.007844376,0.00023413316,0.0003201923,0.00062356296,0.0023116495,0.00090975955,0.002865522,0.00094768626,0.00032443088],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002343179,0.0015956411,0.25302374,0.0027769078,0.00008335269,0.0013226198,0.24781038,0.00077120954,0.004354835,0.03294161,0.01423936,0.440846],"study_design_scores_gemma":[0.00010223235,0.0014744748,0.40466958,0.0032641848,0.000114038856,0.0014034827,0.297288,0.0011063418,0.0017769962,0.020799335,0.26779643,0.00020482155],"about_ca_topic_score_codex":0.0021471914,"about_ca_topic_score_gemma":0.004041855,"teacher_disagreement_score":0.0052297222,"about_ca_system_score_codex":0.0019215862,"about_ca_system_score_gemma":0.0045233252,"threshold_uncertainty_score":0.027657747},"labels":[],"label_agreement":null},{"id":"W2157838605","doi":"10.1155/2014/672896","title":"An Automated BIM Model to Conceptually Design, Analyze, Simulate, and Assess Sustainable Building Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Embodied energy; Sustainability; Energy consumption; Certification; Systems engineering; Environmental design; Energy modeling; Building design; Conceptual design; Sustainable design; Architectural engineering; Design tool; Computer science; Life-cycle assessment; Engineering; Civil engineering; Operations management; Production (economics); Human–computer interaction","score_opus":0.012402703447853028,"score_gpt":0.2478339491887843,"score_spread":0.23543124574093127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157838605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016688144,0.000057938836,0.96034884,0.00015479262,0.00004431678,0.00021985534,0.0013470129,0.0032148685,0.017924279],"genre_scores_gemma":[0.33018976,0.00031534702,0.6542208,0.00008483913,0.000024549166,0.0012464392,0.00326814,0.0005384463,0.01011158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995648,0.00010571138,0.00003329279,0.000051924475,0.00020045177,0.00004391544],"domain_scores_gemma":[0.9995801,0.00014368398,0.00004639076,0.000086856766,0.00011847132,0.000024547533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006914295,0.0006985911,0.00053332926,0.0012795122,0.0007236462,0.0016105842,0.0012835945,0.00091624,0.006238181],"category_scores_gemma":[0.001462545,0.0005548346,0.0009863221,0.0012184677,0.0003898004,0.0013935539,0.0010073646,0.0005730608,0.0019408291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041709864,0.00012293033,0.001966531,0.00007707596,0.000026677793,0.00011201264,0.0001265397,0.91027963,0.001968303,0.033265453,0.0036769304,0.04833626],"study_design_scores_gemma":[0.000011606369,0.000016855261,0.00038542273,0.000014925218,0.000012292931,0.000049168957,0.0000368767,0.9787476,0.0013169438,0.006512903,0.0128823845,0.000013094534],"about_ca_topic_score_codex":0.0074093128,"about_ca_topic_score_gemma":0.009573975,"teacher_disagreement_score":0.0074093128,"about_ca_system_score_codex":0.00093629974,"about_ca_system_score_gemma":0.0020084383,"threshold_uncertainty_score":0.020868838},"labels":[],"label_agreement":null},{"id":"W2180715974","doi":"10.1155/2015/579486","title":"An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Schedule; Building information modeling; Earned value management; Project management; Process (computing); Project planning; Construction management; Pre-construction services; Systems engineering; Cost estimate; Project management triangle; Track (disk drive); Computer science; Engineering management; Engineering; Operations management; Scheduling (production processes); Project charter; Civil engineering","score_opus":0.012136623610980522,"score_gpt":0.22200720299923216,"score_spread":0.20987057938825163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180715974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9571358,0.00017977606,0.032863863,0.0003798308,0.000024597173,0.00038967314,0.00060935837,0.0003267476,0.008090386],"genre_scores_gemma":[0.9428911,0.00022909857,0.053442743,0.000039601353,0.000011327306,0.0002313583,0.0005088235,0.00007754108,0.002568374],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9974685,0.0012238341,0.00017801407,0.00020238695,0.0007453602,0.00018196188],"domain_scores_gemma":[0.99641246,0.001673211,0.00030337705,0.00061771454,0.00069889106,0.00029433938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034044855,0.00050436286,0.0004860733,0.0021794848,0.0012603446,0.0015963772,0.0011602793,0.001592493,0.002223501],"category_scores_gemma":[0.005136969,0.00050143927,0.00048529988,0.0038546734,0.0007047024,0.0015460108,0.0011334782,0.00070330926,0.000605776],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017029326,0.008952032,0.1790502,0.0011919889,0.00022948695,0.018941758,0.022559084,0.17272745,0.024544451,0.019860629,0.01181826,0.53842187],"study_design_scores_gemma":[0.00046759326,0.0046542506,0.19737536,0.00037033652,0.00038037545,0.009344501,0.026903337,0.6255554,0.044861812,0.0067410823,0.08291039,0.00043555978],"about_ca_topic_score_codex":0.008188433,"about_ca_topic_score_gemma":0.012690243,"teacher_disagreement_score":0.008188433,"about_ca_system_score_codex":0.0015163298,"about_ca_system_score_gemma":0.0015373952,"threshold_uncertainty_score":0.018004835},"labels":[],"label_agreement":null},{"id":"W2504132119","doi":"10.1155/2016/2312057","title":"An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Scheduling (production processes); Schedule; Operations research; Parametric statistics; Randomness; Conceptual design; Industrial engineering; Engineering; Computer science; Systems engineering; Operations management","score_opus":0.008098464830622399,"score_gpt":0.21725553795565705,"score_spread":0.20915707312503465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2504132119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018935356,0.00005393411,0.97071236,0.000054047025,0.000025499057,0.00019355945,0.00023971345,0.0058716866,0.003913754],"genre_scores_gemma":[0.30187783,0.000106509586,0.6923855,0.000077682635,0.00002085797,0.00040686876,0.00055889745,0.00016256237,0.004403267],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995172,0.000088449495,0.000049528448,0.00016178522,0.00013799309,0.00004506091],"domain_scores_gemma":[0.9990796,0.0003603769,0.00007998536,0.000107550084,0.00031361054,0.000058802456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009328587,0.0006524576,0.00059907633,0.00067180616,0.00043462802,0.0008244252,0.0011009648,0.00086326845,0.008391183],"category_scores_gemma":[0.0025075937,0.00035657763,0.000368723,0.00038299797,0.00018050945,0.0006072552,0.0006076417,0.0005988348,0.0013820574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006262047,0.0004842605,0.0024212725,0.0003189714,0.000087964436,0.0004931528,0.0004056193,0.42829412,0.051455107,0.0054679965,0.008301876,0.5016434],"study_design_scores_gemma":[0.000060592738,0.00008458904,0.0004995501,0.000017710292,0.000029334791,0.00006998441,0.000047622012,0.98869073,0.0048853448,0.0012209909,0.004375976,0.000017560944],"about_ca_topic_score_codex":0.004244579,"about_ca_topic_score_gemma":0.0055269394,"teacher_disagreement_score":0.008391183,"about_ca_system_score_codex":0.0005361545,"about_ca_system_score_gemma":0.0014963277,"threshold_uncertainty_score":0.028071284},"labels":[],"label_agreement":null}]}