{"meta":{"query_hash":"d295d0798699","filters":{"venue":"Journal of Construction Engineering and Management"},"cohort_total":174,"direct_labels_cover":0,"predictions_cover":174,"exported":174,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/d295d0798699","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Construction+Engineering+and+Management"},"results":[{"id":"W1530020232","doi":"10.1061/(asce)co.1943-7862.0001017","title":"Hybrid Genetic Algorithm-Simulation Optimization Method for Proactively Planning Layout of Material Yard Laydown","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Yard; Haulage; Genetic algorithm; Material handling; Material flow; Computer science; Dynamism; Process (computing); Industrial engineering; Engineering; Algorithm","score_opus":0.013798156412937447,"score_gpt":0.2476960934415437,"score_spread":0.23389793702860626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1530020232","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014072868,0.00021216174,0.9794496,0.000092037175,0.000036733418,0.00006608649,0.000047719168,0.00048606013,0.0055367486],"genre_scores_gemma":[0.45298645,0.00039289013,0.54016536,0.00009531961,0.000024020674,0.0005149333,0.00020033967,0.00014709942,0.005473541],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997099,0.00011684725,0.000010730183,0.000045658177,0.00008573679,0.000031102634],"domain_scores_gemma":[0.9996549,0.00021453314,0.00003587993,0.000017415417,0.000060707975,0.000016658623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000576827,0.000912759,0.00067620655,0.00085097103,0.00042451354,0.0007807717,0.0008455411,0.001077868,0.0019688397],"category_scores_gemma":[0.00096859917,0.00055220386,0.00090569584,0.0007300479,0.0004571723,0.0004483389,0.00054284115,0.0006705013,0.00034469442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000120951145,0.000011059182,0.00014821286,0.000013872883,0.000013418954,0.000018014262,0.000010608626,0.9914472,0.00059003825,0.0015008757,0.000107310225,0.0061272294],"study_design_scores_gemma":[0.0000038493527,0.000009144065,0.00002922729,0.000002874472,0.0000033967442,0.0000042742636,0.0000027686058,0.9990489,0.00017128316,0.00039897306,0.0003231742,0.0000021834676],"about_ca_topic_score_codex":0.012026667,"about_ca_topic_score_gemma":0.009153101,"teacher_disagreement_score":0.012026667,"about_ca_system_score_codex":0.00084408646,"about_ca_system_score_gemma":0.0016324399,"threshold_uncertainty_score":0.023913324},"labels":[],"label_agreement":null},{"id":"W1558515052","doi":"10.1061/(asce)co.1943-7862.0001014","title":"Subway Infrastructure Condition Assessment","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"TOPSIS; Transport engineering; Government (linguistics); Fuzzy logic; Public transport; Capital expenditure; Computer science; Transit (satellite); Scale (ratio); Component (thermodynamics); Risk analysis (engineering); Engineering; Operations research; Business; Finance","score_opus":0.0038253251805908496,"score_gpt":0.20630297897421784,"score_spread":0.202477653793627,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1558515052","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.646023,0.0004259435,0.2857481,0.00022190536,0.000068962974,0.0011620596,0.005156441,0.0020762004,0.05911754],"genre_scores_gemma":[0.9766619,0.00017976908,0.015939742,0.000012543281,0.000007987973,0.000115247785,0.001397302,0.00003407361,0.0056514065],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9984016,0.00019989318,0.00010855853,0.00025984037,0.00085086323,0.00017923642],"domain_scores_gemma":[0.9981889,0.0002451086,0.00035523763,0.0001612928,0.0009361403,0.000113345435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008726108,0.0011264607,0.0005645187,0.004256072,0.0005315084,0.0015948806,0.00095305586,0.0007263238,0.009142909],"category_scores_gemma":[0.0028772124,0.00022567247,0.0007113703,0.0023327377,0.00035311596,0.0019494337,0.001396566,0.0004558368,0.001658819],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043922625,0.00040302478,0.20984857,0.00070270465,0.00017043315,0.0007972976,0.001903068,0.27525395,0.027181806,0.008831383,0.010217443,0.46425116],"study_design_scores_gemma":[0.000021999722,0.0006454843,0.22115742,0.00014879533,0.00014118271,0.00051052903,0.0031953668,0.73458415,0.014824624,0.0050489777,0.01957119,0.00015027774],"about_ca_topic_score_codex":0.011417769,"about_ca_topic_score_gemma":0.014765091,"teacher_disagreement_score":0.011417769,"about_ca_system_score_codex":0.001347916,"about_ca_system_score_gemma":0.0009941311,"threshold_uncertainty_score":0.030586064},"labels":[],"label_agreement":null},{"id":"W1689295453","doi":"10.1061/(asce)co.1943-7862.0001027","title":"Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Scheduling (production processes); Workflow; Executable; Operations research; Schedule; Resource (disambiguation); Traverse; Operations management; Database; Engineering","score_opus":0.05922927266322259,"score_gpt":0.31552136032905054,"score_spread":0.25629208766582795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1689295453","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037276873,0.00008288158,0.99204046,0.000102040925,0.000021117847,0.000082702434,0.000059346334,0.00007610554,0.0038075114],"genre_scores_gemma":[0.26288894,0.00054814364,0.7302905,0.000086961314,0.000060805083,0.00042685802,0.0002889298,0.0001308711,0.005277968],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907374,0.00035474944,0.0000407315,0.00015211434,0.00026622022,0.00011242488],"domain_scores_gemma":[0.99963117,0.00018424046,0.00005032129,0.000031505104,0.00006413478,0.000038640042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012391136,0.0008337295,0.00092775485,0.0009885272,0.0006033412,0.0011270392,0.0014825184,0.000788613,0.0060709184],"category_scores_gemma":[0.0013840437,0.0005587478,0.0010880776,0.0016703717,0.00052917097,0.0011499658,0.000949773,0.0012289095,0.0005966779],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049723196,0.000088097935,0.00027561147,0.000111293404,0.000027777402,0.00009218341,0.00007617024,0.89789796,0.0015678654,0.05824756,0.0013214697,0.04024435],"study_design_scores_gemma":[0.000009775626,0.00004498173,0.00009949101,0.000010193107,0.000009076673,0.000032313063,0.000031416148,0.9785221,0.0005947682,0.017025476,0.0036103239,0.000010155508],"about_ca_topic_score_codex":0.0047073695,"about_ca_topic_score_gemma":0.0055628726,"teacher_disagreement_score":0.0060709184,"about_ca_system_score_codex":0.0019162258,"about_ca_system_score_gemma":0.0026446634,"threshold_uncertainty_score":0.02030921},"labels":[],"label_agreement":null},{"id":"W1967901027","doi":"10.1061/(asce)0733-9364(2000)126:6(414)","title":"Algorithm for Scheduling with Multiskilled Constrained Resources","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Heuristics; Economic shortage; Computer science; Scheduling (production processes); Heuristic; Software; Genetic algorithm scheduling; Operations research; Resource (disambiguation); Job shop scheduling; Industrial engineering; Mathematical optimization; Flow shop scheduling; Artificial intelligence; Engineering; Schedule; Operating system","score_opus":0.017469763523441477,"score_gpt":0.27688464488566594,"score_spread":0.25941488136222446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967901027","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006689922,0.00013733636,0.9878498,0.00015844824,0.000045825243,0.00027656852,0.00014795178,0.0010192054,0.003675033],"genre_scores_gemma":[0.06580388,0.00017283118,0.93036044,0.00006221697,0.000024733077,0.0005799284,0.00035632547,0.00012258289,0.0025169954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953675,0.00010659735,0.000034418365,0.00009625035,0.00012914701,0.00009679399],"domain_scores_gemma":[0.9995716,0.0002259751,0.000044892564,0.00003891279,0.000089678964,0.000028784387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008838157,0.0009061991,0.00081677816,0.0009829637,0.0009817329,0.0011959672,0.0016118407,0.0011657226,0.0075957733],"category_scores_gemma":[0.0016414477,0.00047214527,0.00062792376,0.0012847651,0.00053724594,0.00097496115,0.0011538343,0.0008802518,0.0014527356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025019576,0.0001683902,0.0006308953,0.0003125092,0.00006765147,0.00013917261,0.00021906203,0.7214592,0.003762683,0.038409773,0.0077955155,0.22678497],"study_design_scores_gemma":[0.00015264204,0.000050258823,0.00010410107,0.000017294966,0.00001582451,0.00005070714,0.000036950896,0.98144287,0.001151555,0.010795757,0.0061701755,0.000011843014],"about_ca_topic_score_codex":0.006799937,"about_ca_topic_score_gemma":0.0073757963,"teacher_disagreement_score":0.0075957733,"about_ca_system_score_codex":0.0012218917,"about_ca_system_score_gemma":0.0030917532,"threshold_uncertainty_score":0.025410414},"labels":[],"label_agreement":null},{"id":"W1970170971","doi":"10.1061/(asce)0733-9364(2005)131:11(1196)","title":"E-Society Portal: Integrating Urban Highway Construction Projects into the Knowledge City","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Sustainability; Knowledge management; Vocabulary; Ontology; Stakeholder; Set (abstract data type); Political science","score_opus":0.009160221507535087,"score_gpt":0.2182991698389088,"score_spread":0.2091389483313737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970170971","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18402901,0.0003658959,0.5531056,0.0033038652,0.00026510807,0.0012059645,0.0041075256,0.038933065,0.21468396],"genre_scores_gemma":[0.47117302,0.00078016944,0.47389495,0.00034401604,0.000074838434,0.0006559052,0.0077977446,0.0012696794,0.04400962],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99965155,0.00016042458,0.000028920009,0.000039998275,0.000084684994,0.000034369834],"domain_scores_gemma":[0.9991198,0.00033803988,0.000046532285,0.00019982191,0.0001191147,0.00017669794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000907778,0.00020177147,0.00023270326,0.0009340352,0.0007981217,0.0024183355,0.00058023934,0.00082104746,0.01342823],"category_scores_gemma":[0.0021283408,0.00020292407,0.00030362056,0.0023300548,0.00044038182,0.0044195764,0.0027586387,0.00060633227,0.0029872796],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041767533,0.001422196,0.011919593,0.0006752635,0.000066062894,0.0017140324,0.0061995042,0.013895604,0.012342076,0.10054405,0.074987315,0.7758167],"study_design_scores_gemma":[0.00019528024,0.0003385126,0.009183763,0.00019124219,0.000075812764,0.00087958487,0.0049374136,0.095395714,0.010533174,0.049007297,0.82917297,0.00008916824],"about_ca_topic_score_codex":0.003510037,"about_ca_topic_score_gemma":0.004528148,"teacher_disagreement_score":0.01342823,"about_ca_system_score_codex":0.000492226,"about_ca_system_score_gemma":0.0012834882,"threshold_uncertainty_score":0.044921935},"labels":[],"label_agreement":null},{"id":"W1975246199","doi":"10.1061/(asce)0733-9364(2003)129:6(664)","title":"Optimized Scheduling of Linear Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":58,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bidding; Computer science; Scheduling (production processes); Crew; Linear programming; Operations research; Software; Crew scheduling; Process (computing); Industrial engineering; Engineering; Operations management; Algorithm; Programming language","score_opus":0.03945352496548811,"score_gpt":0.3002256918817797,"score_spread":0.2607721669162916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975246199","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13216865,0.00036703178,0.8412126,0.00031407937,0.00006245252,0.0002896082,0.0007301213,0.00057223387,0.024283238],"genre_scores_gemma":[0.85674834,0.00037709883,0.12899998,0.00004958005,0.000021048603,0.00040502488,0.0005688074,0.00011828007,0.012711936],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999382,0.00025160302,0.000019961919,0.000116829426,0.00012370116,0.00010586263],"domain_scores_gemma":[0.999463,0.00027769504,0.00009942493,0.00003184589,0.00007431486,0.000053719377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007722751,0.00064109,0.0008100106,0.0004399792,0.00040251706,0.0012468095,0.0010050462,0.0007681817,0.0046990053],"category_scores_gemma":[0.0016468804,0.0005906398,0.00049159274,0.00072431413,0.0005327986,0.0008329282,0.00057479605,0.00060801796,0.0005067417],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002346907,0.000013406507,0.00010202008,0.000017083885,0.000003853588,0.000014614669,0.000010029248,0.9949385,0.00015138883,0.0021006344,0.00016347849,0.0024615533],"study_design_scores_gemma":[0.0000120657505,0.000026754058,0.000075113225,0.0000028012018,0.0000028867169,0.000004103454,0.0000083713585,0.9978142,0.00012810047,0.0015012585,0.00042145172,0.0000028945599],"about_ca_topic_score_codex":0.01384945,"about_ca_topic_score_gemma":0.014271513,"teacher_disagreement_score":0.01384945,"about_ca_system_score_codex":0.0016785277,"about_ca_system_score_gemma":0.0022387477,"threshold_uncertainty_score":0.027537644},"labels":[],"label_agreement":null},{"id":"W1975392223","doi":"10.1061/(asce)co.1943-7862.0000364","title":"Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visibility; Supply network; Dependency (UML); Work (physics); Computer science; Tracking (education); Supply chain; Field (mathematics); Risk analysis (engineering); Systems engineering; Business; Engineering; Artificial intelligence; Marketing","score_opus":0.006045387046516512,"score_gpt":0.18553003637183574,"score_spread":0.1794846493253192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975392223","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80514467,0.00011556085,0.17653313,0.00023540309,0.000011795178,0.00013573999,0.000051106595,0.00027819225,0.01749441],"genre_scores_gemma":[0.9627018,0.000078819954,0.036688007,0.0000047905,0.0000018320927,0.000025734487,0.000023447432,0.000010532132,0.00046503622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833566,0.00089390716,0.00005741406,0.00011832981,0.00045218438,0.00014247608],"domain_scores_gemma":[0.9968245,0.0018123438,0.0005758274,0.00035736721,0.00036323004,0.000066656474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016524736,0.00038760505,0.00026338996,0.00096684555,0.0004867015,0.0020679878,0.0008871775,0.00048447395,0.001946506],"category_scores_gemma":[0.0058882376,0.00034498176,0.00039194015,0.0013472859,0.0006487726,0.0029615501,0.0017338028,0.00036774605,0.0001715884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043338572,0.0011090824,0.05918096,0.00035951028,0.000083380044,0.00035829467,0.003123794,0.69283426,0.026348148,0.026580859,0.000802091,0.18878616],"study_design_scores_gemma":[0.00013632994,0.0012816646,0.026067799,0.000106453284,0.00014838623,0.00023077236,0.0024336386,0.9276561,0.02211762,0.010739632,0.008976046,0.000105536245],"about_ca_topic_score_codex":0.0066625318,"about_ca_topic_score_gemma":0.013196102,"teacher_disagreement_score":0.0066625318,"about_ca_system_score_codex":0.0012272005,"about_ca_system_score_gemma":0.0022702278,"threshold_uncertainty_score":0.01324749},"labels":[],"label_agreement":null},{"id":"W1977137067","doi":"10.1061/(asce)co.1943-7862.0000705","title":"Hands-On Exercise for Enhancing Students’ Construction Management Skills","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Schedule; Project management; Procurement; Computer science; Construction management; Interdependence; Engineering management; Project planning; Project management triangle; Knowledge management; Engineering; Systems engineering","score_opus":0.0026592082836023436,"score_gpt":0.18874731535874578,"score_spread":0.18608810707514345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977137067","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8957008,0.00048556124,0.04819031,0.0013755679,0.0004780249,0.001970408,0.00018457414,0.0021677795,0.049446944],"genre_scores_gemma":[0.7631044,0.0009927293,0.1891943,0.00084382715,0.00028093377,0.0019743713,0.0004114835,0.00022681993,0.042971216],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99910647,0.00020245576,0.000047553523,0.00015409898,0.00022603673,0.0002633854],"domain_scores_gemma":[0.998705,0.0004056587,0.00008418428,0.00015054128,0.00014954408,0.00050508813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001087534,0.001753807,0.0008981653,0.0010449219,0.000776563,0.001225972,0.0014155458,0.0014839161,0.02142823],"category_scores_gemma":[0.0025847615,0.00034857815,0.00062470004,0.0003603644,0.0005364323,0.0011984863,0.002815732,0.0015925302,0.0054652067],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013169445,0.08942504,0.0066269436,0.0015050739,0.000060275448,0.0014596276,0.0073105795,0.0022878747,0.09628129,0.0024347634,0.020407377,0.7708842],"study_design_scores_gemma":[0.0046451096,0.083173305,0.16426153,0.002658391,0.00063761417,0.011767386,0.018209223,0.02660838,0.23668817,0.025255471,0.4253639,0.000731568],"about_ca_topic_score_codex":0.00017129644,"about_ca_topic_score_gemma":0.0005000443,"teacher_disagreement_score":0.02142823,"about_ca_system_score_codex":0.00025290114,"about_ca_system_score_gemma":0.000580615,"threshold_uncertainty_score":0.07168454},"labels":[],"label_agreement":null},{"id":"W1977950491","doi":"10.1061/(asce)co.1943-7862.0000220","title":"Role of Simulation in Construction Engineering and Management","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":356,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Software deployment; Key (lock); Computer science; Construction management; Systems engineering; Construction industry; Management science; Engineering management; Construction engineering; Engineering; Software engineering; Civil engineering; Computer security","score_opus":0.002317563432346137,"score_gpt":0.17324124150140063,"score_spread":0.1709236780690545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977950491","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01932659,0.07343151,0.5494333,0.051213995,0.0021542374,0.00016449946,0.00018017678,0.00068808696,0.3034076],"genre_scores_gemma":[0.73460466,0.080937386,0.15675907,0.003066582,0.0019463727,0.00035887994,0.00024305831,0.00025954086,0.021824436],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99408543,0.004272273,0.00021203814,0.0003763733,0.0008741791,0.00017964236],"domain_scores_gemma":[0.9924892,0.005699442,0.00029828542,0.0006102719,0.0005223263,0.00038050365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052412525,0.00074812025,0.00093488203,0.0017034555,0.0016568541,0.007766622,0.0013189826,0.0026484518,0.00456223],"category_scores_gemma":[0.008905742,0.00038977194,0.0005491831,0.0017863249,0.008775595,0.005871517,0.0037061982,0.0034017186,0.0007838446],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001618865,0.000024658957,0.0005523492,0.00013996895,0.000020247877,0.000049376762,0.00055676914,0.023483505,0.00020280994,0.9346272,0.0029109963,0.03741605],"study_design_scores_gemma":[0.000012974082,0.00006446013,0.00038907403,0.00056905154,0.00001658148,0.00010487176,0.000641724,0.047269132,0.0005207657,0.76888525,0.18148361,0.000042525247],"about_ca_topic_score_codex":0.003739047,"about_ca_topic_score_gemma":0.0023044883,"teacher_disagreement_score":0.007766622,"about_ca_system_score_codex":0.0030480016,"about_ca_system_score_gemma":0.004396655,"threshold_uncertainty_score":0.027718782},"labels":[],"label_agreement":null},{"id":"W1978709380","doi":"10.1061/(asce)co.1943-7862.0000959","title":"Setting Baseline Rates for On-Site Work Categories in the Construction Industry","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Baseline (sea); Flexibility (engineering); Work (physics); Computer science; Installation; Inference; Construction industry; Industrial engineering; Operations research; Engineering; Construction engineering; Artificial intelligence; Statistics; Mathematics","score_opus":0.00493514479746501,"score_gpt":0.2023066663861754,"score_spread":0.19737152158871038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978709380","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66492796,0.000294965,0.32191467,0.00013088842,0.000066807035,0.00045823262,0.002099437,0.0007485163,0.009358515],"genre_scores_gemma":[0.8905729,0.00011813428,0.10582571,0.000020220206,0.000007885866,0.0005404972,0.0018768462,0.000065713946,0.00097214227],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9959031,0.001311567,0.0003692649,0.0008445966,0.0013178901,0.00025357693],"domain_scores_gemma":[0.99054176,0.0034298636,0.0013588842,0.0015156701,0.0029093167,0.00024450247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049592415,0.00062917575,0.0005194259,0.0015458172,0.0005338073,0.0011021402,0.0011248864,0.00083406793,0.0012091157],"category_scores_gemma":[0.016837697,0.00031718446,0.00040242175,0.0015298831,0.00041942336,0.0015201966,0.00086707954,0.0007220405,0.00076770195],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014676646,0.0016119318,0.29133573,0.000808427,0.00009727615,0.00025247483,0.0030205052,0.13738708,0.030907806,0.00833914,0.005347368,0.51942456],"study_design_scores_gemma":[0.000096232034,0.0024035857,0.47307646,0.000539956,0.0000741811,0.00047134416,0.004856129,0.43335977,0.054070704,0.012211274,0.018581672,0.0002586549],"about_ca_topic_score_codex":0.0059919087,"about_ca_topic_score_gemma":0.008787607,"teacher_disagreement_score":0.0059919087,"about_ca_system_score_codex":0.0010966209,"about_ca_system_score_gemma":0.0009974536,"threshold_uncertainty_score":0.026227295},"labels":[],"label_agreement":null},{"id":"W1981125839","doi":"10.1061/(asce)0733-9364(2006)132:8(895)","title":"Discussion of “Determination of Haul Distance and Direction in Mass Excavation” by Jaeho Son, Kris G. Mattila, and Donald S. Myers","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Water resources management and optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Psychology; Engineering","score_opus":0.0014880663310615635,"score_gpt":0.15036145592187225,"score_spread":0.14887338959081067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981125839","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008749416,0.005272966,0.9272804,0.04298364,0.0016875999,0.00009539756,0.0001874035,0.00011654849,0.013626628],"genre_scores_gemma":[0.43755832,0.009252157,0.5062399,0.013316443,0.0046822964,0.00038462682,0.00023432032,0.00018643663,0.028145503],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984377,0.00084682205,0.000057744914,0.00022028276,0.00035147613,0.000085957],"domain_scores_gemma":[0.99810046,0.001440983,0.00012717023,0.00006362816,0.0002030133,0.000064755644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003115171,0.0007084011,0.0007265,0.0008473477,0.0011860004,0.0019612266,0.0022710229,0.0033608705,0.004527974],"category_scores_gemma":[0.0054805866,0.0007178269,0.0012570759,0.0013444441,0.003002898,0.0030791247,0.0011453676,0.002496818,0.0005978289],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090921,0.00008032303,0.0014628691,0.00040114278,0.000052072653,0.00036148189,0.0004258987,0.13692842,0.0014301256,0.77062255,0.035014816,0.053129382],"study_design_scores_gemma":[0.00005402701,0.00020423246,0.0012422124,0.00027313392,0.000039339644,0.00035872572,0.0005341611,0.40965152,0.0030344625,0.43915865,0.14535,0.00009957256],"about_ca_topic_score_codex":0.004592329,"about_ca_topic_score_gemma":0.0054228655,"teacher_disagreement_score":0.004592329,"about_ca_system_score_codex":0.0015618898,"about_ca_system_score_gemma":0.0012209504,"threshold_uncertainty_score":0.016474843},"labels":[],"label_agreement":null},{"id":"W1981137850","doi":"10.1061/(asce)co.1943-7862.0000072","title":"Analysis of Observed Skill Affinity Patterns and Motivation for Multiskilling among Craft Workers in the U.S. Industrial Construction Sector","year":2009,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Craft; Workforce; Certification; Productivity; Economic shortage; Quality (philosophy); Set (abstract data type); Duration (music); Work (physics); Cluster (spacecraft); Business; Demographic economics; Operations management; Computer science; Economics; Engineering; Management; Geography; Economic growth; Mechanical engineering","score_opus":0.0774204397000185,"score_gpt":0.2900160296086668,"score_spread":0.2125955899086483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981137850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99981445,0.000005919832,0.000043047432,0.000009259703,2.5419936e-7,0.0000029038938,0.000036558453,6.061121e-7,0.00008704108],"genre_scores_gemma":[0.99966085,0.000013838438,0.0001278861,0.0000047224066,7.109541e-7,0.0000066161715,0.00009956978,3.936452e-7,0.00008536032],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995221,0.00015409607,0.00005006384,0.00007910519,0.000109219625,0.000085360516],"domain_scores_gemma":[0.99549496,0.001874651,0.0013805326,0.0002262692,0.0005924752,0.00043103282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009334116,0.00012673836,0.00013760057,0.0010061163,0.00047507155,0.0004411297,0.0002672338,0.0003050181,0.0010095071],"category_scores_gemma":[0.004253072,0.00015878346,0.0001596683,0.0010836291,0.00034090987,0.00028354334,0.0004972704,0.00036435534,0.00015082404],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013538959,0.00005044833,0.99701846,0.0000042080405,0.000007642454,0.000008539745,0.00061257667,0.000050018945,0.00020817292,0.000023031162,0.000036274487,0.0019670743],"study_design_scores_gemma":[9.5325186e-7,0.000031359727,0.9981816,0.0000019059556,0.0000017144419,0.000011982352,0.0014109926,0.00023705709,0.00004838587,0.000015223895,0.000057362784,0.0000015515774],"about_ca_topic_score_codex":0.013720313,"about_ca_topic_score_gemma":0.04077201,"teacher_disagreement_score":0.013720313,"about_ca_system_score_codex":0.0004898686,"about_ca_system_score_gemma":0.00071267446,"threshold_uncertainty_score":0.027280867},"labels":[],"label_agreement":null},{"id":"W1981796902","doi":"10.1061/(asce)0733-9364(2005)131:5(505)","title":"Daily Windows Delay Analysis","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":80,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Critical path method; Schedule; Window (computing); Software; Compensation (psychology); Microsoft Windows; Software engineering; Operations research; Industrial engineering; Systems engineering; Operating system; Engineering; World Wide Web","score_opus":0.01914998068231857,"score_gpt":0.281156245578874,"score_spread":0.26200626489655543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981796902","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.082777806,0.00038056512,0.89347917,0.00013125365,0.00014305503,0.00035109054,0.0022539718,0.00417764,0.01630549],"genre_scores_gemma":[0.57791096,0.0006129991,0.40244475,0.00005253529,0.000076952514,0.000496011,0.0023283788,0.0012256076,0.014851755],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99912626,0.00011502436,0.000053697586,0.00020461026,0.00041963367,0.00008073819],"domain_scores_gemma":[0.99762565,0.000907585,0.00026219786,0.00030548102,0.00082325225,0.00007591496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008690556,0.0009348882,0.0005896751,0.0030628678,0.00051552407,0.0014664696,0.0011257527,0.0005263602,0.015293251],"category_scores_gemma":[0.0045266226,0.00036315672,0.0005625075,0.002561442,0.00029491185,0.0016063825,0.00070274743,0.00079024653,0.0023600985],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070683245,0.00019020039,0.012326232,0.00067728036,0.0001601683,0.00041468415,0.0009754418,0.1638473,0.038134035,0.04998027,0.019126449,0.71346116],"study_design_scores_gemma":[0.000065317814,0.00040832086,0.01449043,0.000099314086,0.00012455208,0.0006828736,0.00083236344,0.8323779,0.043858018,0.034174956,0.07269019,0.00019575444],"about_ca_topic_score_codex":0.0048091775,"about_ca_topic_score_gemma":0.003927434,"teacher_disagreement_score":0.015293251,"about_ca_system_score_codex":0.0007143183,"about_ca_system_score_gemma":0.001062285,"threshold_uncertainty_score":0.05116099},"labels":[],"label_agreement":null},{"id":"W1982161115","doi":"10.1061/(asce)0733-9364(2000)126:2(137)","title":"Project Performance Control in Reconstruction Projects","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Control (management); Quality (philosophy); Earned value management; Process management; Performance indicator; Engineering; Project planning; Construction engineering; Engineering management; Computer science; Project management; Transport engineering; Operations management; Systems engineering; Business; Project charter; Artificial intelligence; Marketing","score_opus":0.004215611017472729,"score_gpt":0.17087970827404322,"score_spread":0.1666640972565705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982161115","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96578383,0.0005335917,0.025302906,0.00018442635,0.000017411123,0.0002710421,0.000061883235,0.0001800854,0.007664823],"genre_scores_gemma":[0.99327636,0.00013350244,0.0055713495,0.000009980099,0.000008947314,0.00011510036,0.000061857,0.00001845169,0.0008043247],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9730819,0.0148314005,0.0016863358,0.0018274041,0.007600849,0.0009722],"domain_scores_gemma":[0.9413124,0.028878141,0.0123566305,0.0045999964,0.011165074,0.0016878094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019748414,0.00054392905,0.00037240775,0.0026914096,0.00097314315,0.002304907,0.0009331044,0.000300246,0.00088542013],"category_scores_gemma":[0.051409684,0.00031657872,0.00019521234,0.0024887684,0.0012460557,0.0012180331,0.0014927527,0.0004834344,0.00019553874],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012294677,0.0008936698,0.2335302,0.0005931493,0.00012214639,0.00019469223,0.017017122,0.0126830535,0.011422959,0.0028978272,0.0015623006,0.71785355],"study_design_scores_gemma":[0.00016394752,0.005139755,0.90456903,0.00037425317,0.00012814456,0.0006514741,0.016244706,0.028677301,0.022129742,0.00196794,0.01974098,0.00021263381],"about_ca_topic_score_codex":0.0050892276,"about_ca_topic_score_gemma":0.0036876353,"teacher_disagreement_score":0.019748414,"about_ca_system_score_codex":0.002308558,"about_ca_system_score_gemma":0.0023902662,"threshold_uncertainty_score":0.10444087},"labels":[],"label_agreement":null},{"id":"W1982536982","doi":"10.1061/(asce)0733-9364(2007)133:10(761)","title":"Integrating Value Analysis and Quality Function Deployment for Evaluating Design Alternatives","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Quality Function Deployment in Product Design","field":"Business, Management and Accounting","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Quality function deployment; Data envelopment analysis; Computer science; House of Quality; Function (biology); Software deployment; Measure (data warehouse); Quality (philosophy); Index (typography); Customer needs; Systems engineering; Operations research; Risk analysis (engineering); Reliability engineering; Value engineering; Engineering; Operations management; Service quality; Data mining; Mathematics; Software engineering; Mathematical optimization; Business","score_opus":0.04553745116822039,"score_gpt":0.29642467069940165,"score_spread":0.25088721953118126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982536982","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012290628,0.0003321371,0.97984916,0.00026055003,0.000017753358,0.00026311897,0.000042328746,0.00009758725,0.0068468675],"genre_scores_gemma":[0.22724241,0.0003583658,0.77102196,0.000047945294,0.000021296217,0.00053943985,0.00009188432,0.000046028134,0.0006307232],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97212875,0.017701322,0.0011066002,0.00073581445,0.007727347,0.00060013024],"domain_scores_gemma":[0.97597504,0.017964954,0.0015994358,0.0010139571,0.0031537442,0.00029289845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020043517,0.002438407,0.0017666253,0.012147982,0.0012665995,0.0055409474,0.0014194254,0.0014043695,0.0029403262],"category_scores_gemma":[0.034042504,0.0009684312,0.0017896983,0.0051175226,0.0025327972,0.0042033433,0.0022830844,0.0013691663,0.00045493172],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015734287,0.00025315981,0.0035466035,0.00088642724,0.00027629602,0.00023480023,0.0017642392,0.19619012,0.0045811166,0.36929604,0.0013439326,0.4214698],"study_design_scores_gemma":[0.00009868562,0.0005492585,0.0022436765,0.0007192281,0.000199074,0.00023793658,0.001171272,0.63808846,0.0064309905,0.33711758,0.012915589,0.00022828496],"about_ca_topic_score_codex":0.0031109892,"about_ca_topic_score_gemma":0.0035110295,"teacher_disagreement_score":0.020043517,"about_ca_system_score_codex":0.004684412,"about_ca_system_score_gemma":0.003818187,"threshold_uncertainty_score":0.106001556},"labels":[],"label_agreement":null},{"id":"W1982902830","doi":"10.1061/(asce)co.1943-7862.0000576","title":"Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Vagueness; Probabilistic logic; Computer science; Fuzzy logic; Interval (graph theory); Fuzzy set; Operations research; Monte Carlo method; Mathematical optimization; Artificial intelligence; Mathematics; Statistics","score_opus":0.07605789002646528,"score_gpt":0.3634604772301947,"score_spread":0.2874025872037294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982902830","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010450458,0.00029675287,0.97869086,0.00028228268,0.00004445699,0.00012115243,0.000248785,0.0001184541,0.009746864],"genre_scores_gemma":[0.8018942,0.0011706259,0.17901978,0.00017634478,0.00009632911,0.0009979347,0.0006194173,0.00008936454,0.015935974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988803,0.00036959007,0.00005443334,0.00016645915,0.000390302,0.00013887651],"domain_scores_gemma":[0.9991271,0.0004749649,0.00011622151,0.000040878673,0.00019961785,0.00004116186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019333554,0.001160124,0.0014256401,0.0014136491,0.0007833794,0.0021314593,0.003545526,0.002212245,0.0048295157],"category_scores_gemma":[0.0031136244,0.00064117985,0.0016754303,0.0019819867,0.0008380294,0.0021939394,0.000946007,0.0019516309,0.00066870166],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009395903,0.000010721007,0.00009433573,0.000023980425,0.000013029975,0.00004822588,0.000023818735,0.96004176,0.00018273183,0.03604705,0.00022078797,0.0032842113],"study_design_scores_gemma":[0.0000029985188,0.000007340226,0.00003943579,0.000004901696,0.00000548107,0.000012499407,0.0000051189363,0.9903196,0.000055016117,0.008979187,0.00056265085,0.000005788004],"about_ca_topic_score_codex":0.015046168,"about_ca_topic_score_gemma":0.008966066,"teacher_disagreement_score":0.015046168,"about_ca_system_score_codex":0.003168594,"about_ca_system_score_gemma":0.0024131967,"threshold_uncertainty_score":0.02991718},"labels":[],"label_agreement":null},{"id":"W1986754214","doi":"10.1061/(asce)0733-9364(2007)133:10(743)","title":"Modeling the Effect of Subjective Factors on Productivity of Trenchless Technology Application to Buried Infrastructure Systems","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Trenchless technology; Productivity; Schedule; Analytic hierarchy process; Production (economics); Engineering; Software; Fuzzy logic; Installation; Operations research; Computer science; Industrial engineering; Reliability engineering; Artificial intelligence; Pipeline transport; Economics","score_opus":0.002238740969505923,"score_gpt":0.18601821056462317,"score_spread":0.18377946959511726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986754214","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9061191,0.000074837735,0.09179098,0.000050116956,0.000007492896,0.000073795694,0.00007281384,0.000053370695,0.0017576047],"genre_scores_gemma":[0.9939334,0.00003853429,0.0056792973,0.0000026185726,0.0000020743319,0.000025549793,0.00003110108,0.0000046436003,0.00028275017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891937,0.00057829934,0.000053294287,0.000114968745,0.0002070774,0.0001269474],"domain_scores_gemma":[0.9892146,0.008206571,0.0012114915,0.00026685925,0.0008996259,0.00020077809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023735522,0.0007359091,0.00034796525,0.000623208,0.0002613019,0.0010001684,0.00046711694,0.00045946747,0.0008813983],"category_scores_gemma":[0.012005557,0.00033857266,0.0005296842,0.00067022117,0.00040737152,0.00079858187,0.00066967716,0.00039481153,0.00009403106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002211885,0.00013767886,0.034504525,0.00007001734,0.000057166224,0.0001612365,0.00028513142,0.94485086,0.0025245182,0.0014226908,0.0000926671,0.015672265],"study_design_scores_gemma":[0.000007743925,0.00014578532,0.009259922,0.000004348529,0.000020676243,0.000015025886,0.00007795985,0.9889924,0.0009126333,0.0004679099,0.00008563137,0.000009972467],"about_ca_topic_score_codex":0.011027151,"about_ca_topic_score_gemma":0.008168397,"teacher_disagreement_score":0.011027151,"about_ca_system_score_codex":0.0012439456,"about_ca_system_score_gemma":0.000804015,"threshold_uncertainty_score":0.021925926},"labels":[],"label_agreement":null},{"id":"W1987479515","doi":"10.1061/(asce)0733-9364(2004)130:6(853)","title":"Risks in Chinese Construction Market—Contractors’ Perspective","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":131,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Tsinghua University","keywords":"China; Business; Cronbach's alpha; Government (linguistics); Unanimity; Accession; Index (typography); Industrial organization; Marketing; International trade; Political science","score_opus":0.024891860383640406,"score_gpt":0.3193339995376016,"score_spread":0.2944421391539612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987479515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92626786,0.001169176,0.0015224791,0.00806053,0.00004706836,0.00006796018,0.00007414467,0.00000772253,0.06278303],"genre_scores_gemma":[0.9974075,0.00068511296,0.00009854356,0.00014381221,0.000030266183,0.000007528778,0.000011620524,0.0000013944622,0.001614048],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.997841,0.00067320414,0.00009813594,0.00012040264,0.0006175215,0.0006497097],"domain_scores_gemma":[0.99682,0.0008916558,0.00071527803,0.00009775842,0.00060200033,0.00087332295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027914722,0.00036119198,0.00022640306,0.0027353456,0.0044655767,0.0050464054,0.00067762454,0.0014518235,0.0045660487],"category_scores_gemma":[0.0036180946,0.00021622673,0.00033217267,0.002034787,0.0048144907,0.0037670846,0.0018259368,0.0010642447,0.0001873719],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002595738,0.00057279546,0.29958656,0.0003644269,0.000083206476,0.012099639,0.24765563,0.0068065175,0.002461233,0.35765445,0.01067103,0.061784938],"study_design_scores_gemma":[0.000052376992,0.00051494053,0.3504026,0.0005763981,0.000084469604,0.003934452,0.44558746,0.029129006,0.0017542758,0.055123433,0.112505704,0.00033486512],"about_ca_topic_score_codex":0.06591552,"about_ca_topic_score_gemma":0.036765926,"teacher_disagreement_score":0.06591552,"about_ca_system_score_codex":0.008314355,"about_ca_system_score_gemma":0.008133751,"threshold_uncertainty_score":0.1310637},"labels":[],"label_agreement":null},{"id":"W1988999677","doi":"10.1061/(asce)0733-9364(2003)129:6(706.3)","title":"Discussion of “Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization” by Bryan Christopher Que","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Advanced Multi-Objective Optimization Algorithms","field":"Computer Science","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Genetic algorithm; Operations research; Mathematical optimization; Mathematics; Machine learning","score_opus":0.0029201399319309885,"score_gpt":0.20517314820778343,"score_spread":0.20225300827585244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988999677","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023980634,0.0046627265,0.12564634,0.80438757,0.0074336054,0.00008716301,0.000048936417,0.0001576958,0.055177804],"genre_scores_gemma":[0.23263462,0.0110975485,0.1955533,0.47673988,0.012367937,0.00079173135,0.00007522727,0.0006915569,0.070048265],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99205244,0.0048291674,0.00025878896,0.00047973864,0.0020921903,0.00028772198],"domain_scores_gemma":[0.9727683,0.019582823,0.00062393036,0.0012191889,0.0054198545,0.0003859886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01578339,0.00089379173,0.0005877074,0.00074519124,0.0031991224,0.004391221,0.0043507805,0.010590776,0.006336165],"category_scores_gemma":[0.06071073,0.00059734273,0.0010245953,0.0015144179,0.0073330346,0.0064603607,0.0024744952,0.014376558,0.0013238929],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040580806,0.00004886375,0.00039093697,0.00020193883,0.000050822124,0.00015272696,0.0006907839,0.019102782,0.000527506,0.7650115,0.17737792,0.03640354],"study_design_scores_gemma":[0.000068759844,0.00006364604,0.00054194813,0.0006670897,0.00004865255,0.00016904528,0.00093608454,0.03737699,0.0016235738,0.43185776,0.5265414,0.00010503869],"about_ca_topic_score_codex":0.03305658,"about_ca_topic_score_gemma":0.0460686,"teacher_disagreement_score":0.03305658,"about_ca_system_score_codex":0.00391678,"about_ca_system_score_gemma":0.006134934,"threshold_uncertainty_score":0.08347154},"labels":[],"label_agreement":null},{"id":"W1989218124","doi":"10.1061/(asce)co.1943-7862.0000940","title":"Optimizing Earthmoving Job Planning Based on Evaluation of Temporary Haul Road Networks Design for Mass Earthworks Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Network planning and design; Transport engineering; Grading (engineering); Truck; Shortest path problem; Engineering; Plan (archaeology); Operations research; Crew; Grid; Computer science; Civil engineering; Graph","score_opus":0.024578972566398453,"score_gpt":0.2234003905354289,"score_spread":0.19882141796903044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989218124","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33607352,0.00014568502,0.6552152,0.00008350937,0.000013224448,0.00028718179,0.00011018024,0.00032802147,0.0077434187],"genre_scores_gemma":[0.88699436,0.000094959505,0.11120019,0.0000075223415,0.0000023585578,0.000108931956,0.00009311696,0.000053120846,0.0014454521],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995017,0.0001890923,0.000016105358,0.000058065805,0.00013561663,0.00009942034],"domain_scores_gemma":[0.999345,0.0003173365,0.00009819392,0.00004471171,0.00012868016,0.00006609632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010086909,0.00061209564,0.00056333694,0.00069365994,0.00037758754,0.0009475147,0.00066402,0.00040548312,0.0017484282],"category_scores_gemma":[0.0020112914,0.00034982857,0.0003400607,0.00060124684,0.00043683546,0.00074312335,0.00052098284,0.00032566086,0.00015330943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003780421,0.00002737213,0.0009290306,0.000036099013,0.000006683985,0.000020398062,0.000033592223,0.97966945,0.0014687333,0.0010724065,0.000108907014,0.01658952],"study_design_scores_gemma":[0.0000065343456,0.000079544596,0.00085754,0.0000050120207,0.000005924072,0.000006401913,0.00008700513,0.9963666,0.0015297554,0.0007223449,0.0003278461,0.0000054077223],"about_ca_topic_score_codex":0.013216577,"about_ca_topic_score_gemma":0.024706172,"teacher_disagreement_score":0.013216577,"about_ca_system_score_codex":0.0013744445,"about_ca_system_score_gemma":0.0022544595,"threshold_uncertainty_score":0.02627933},"labels":[],"label_agreement":null},{"id":"W1991271986","doi":"10.1061/(asce)co.1943-7862.0000334","title":"Fuzzy Preference Relations Consensus Approach to Reduce Conflicts on Shared Responsibilities in the Owner Managing Contractor Delivery System","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Task (project management); Consistency (knowledge bases); Preference; Process (computing); Computer science; Fuzzy logic; Similarity (geometry); Work (physics); Knowledge management; Artificial intelligence; Engineering; Economics; Management","score_opus":0.16484555668427497,"score_gpt":0.31109013383897843,"score_spread":0.14624457715470346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991271986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01668425,0.00013825293,0.9792493,0.0001405173,0.000017947319,0.00010072504,0.000021044787,0.00011377214,0.0035341347],"genre_scores_gemma":[0.5742745,0.00029075774,0.42033002,0.0001036018,0.000038389226,0.00027057648,0.00012499171,0.000053381234,0.004513758],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99464804,0.0023134649,0.000280309,0.0006164176,0.0017948872,0.00034682965],"domain_scores_gemma":[0.99736077,0.0010365524,0.0002594247,0.00020276904,0.000977937,0.00016257112],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050009624,0.0008061546,0.00094210514,0.0014638158,0.0014766642,0.001392384,0.0017019064,0.0009490801,0.0028148901],"category_scores_gemma":[0.006820695,0.00047001638,0.0011420621,0.0014398476,0.00078488316,0.0028001387,0.0015375196,0.0012705795,0.00042798338],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027559703,0.00026248855,0.0018906541,0.00037228016,0.00019711281,0.00045868862,0.0019143777,0.58689034,0.009438048,0.13210763,0.0031093692,0.26308343],"study_design_scores_gemma":[0.000038214617,0.00013932808,0.00038755508,0.000024217248,0.000051861414,0.0001114916,0.00034357276,0.9516188,0.003216694,0.039632794,0.0043961504,0.00003926707],"about_ca_topic_score_codex":0.0070953337,"about_ca_topic_score_gemma":0.0051763994,"teacher_disagreement_score":0.0070953337,"about_ca_system_score_codex":0.0019302481,"about_ca_system_score_gemma":0.0029901182,"threshold_uncertainty_score":0.026447952},"labels":[],"label_agreement":null},{"id":"W1997673132","doi":"10.1061/(asce)co.1943-7862.0000329","title":"Differences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Craft; Productivity; Workforce; Quarter (Canadian coin); Demographic economics; Business; Public relations; Labour economics; Political science; Economic growth; Geography; Economics","score_opus":0.02315434474093346,"score_gpt":0.34115355572267647,"score_spread":0.317999210981743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997673132","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99799144,0.00008996259,0.00005896133,0.000120114215,0.000004745845,0.000002185198,0.000019999343,6.458028e-7,0.0017118993],"genre_scores_gemma":[0.9989784,0.0001546569,0.000033184493,0.00007379094,0.000006415824,0.0000036730153,0.000029676597,0.0000011136894,0.00071907084],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9991767,0.0003299552,0.000037660207,0.00004602034,0.00020220179,0.00020739382],"domain_scores_gemma":[0.99802136,0.0006140883,0.00045163912,0.000053331547,0.0004416084,0.00041797047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018672193,0.00017604999,0.00018169456,0.0009195812,0.0009127237,0.0014847217,0.00022442684,0.00026507306,0.0020700218],"category_scores_gemma":[0.003216443,0.00011900712,0.00022234321,0.00050069485,0.0010912847,0.0005462041,0.00084433577,0.0003844392,0.00021585471],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023195839,0.00014478774,0.6626263,0.00008239582,0.000047272468,0.0007198013,0.3027806,0.0001432891,0.0029889797,0.0006873303,0.0011106869,0.028436642],"study_design_scores_gemma":[0.000013360544,0.00013833187,0.41980207,0.00007249334,0.00001342096,0.00023839615,0.57526517,0.00018110075,0.00032530836,0.0002584753,0.0036692529,0.000022614839],"about_ca_topic_score_codex":0.020081645,"about_ca_topic_score_gemma":0.03144439,"teacher_disagreement_score":0.020081645,"about_ca_system_score_codex":0.00072228553,"about_ca_system_score_gemma":0.0008357307,"threshold_uncertainty_score":0.03992951},"labels":[],"label_agreement":null},{"id":"W1997967173","doi":"10.1061/(asce)0733-9364(2007)133:11(827)","title":"Field Study of Concrete Maturity Methodology in Cold Weather","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Fire effects on concrete materials","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Vanguard College; University of Alberta","funders":"","keywords":"Maturity (psychological); Reliability (semiconductor); Environmental science; Cold weather; Computer science; Reinforced concrete; Reliability engineering; Forensic engineering; Engineering; Meteorology; Structural engineering; Geography","score_opus":0.012905176673413673,"score_gpt":0.24363632847733876,"score_spread":0.2307311518039251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997967173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905027,0.00002410215,0.008153796,0.000019772357,0.000008558651,0.000247202,0.00005959028,0.000030334953,0.00095400383],"genre_scores_gemma":[0.98405427,0.00004100802,0.014687247,0.000015900665,0.000009896458,0.00019218653,0.00010747007,0.000015177701,0.00087686157],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9975128,0.001067005,0.00015400085,0.00043373712,0.0006425588,0.00018988478],"domain_scores_gemma":[0.98924303,0.0043082978,0.0015307139,0.0010381428,0.003306525,0.0005732401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005722072,0.00034930438,0.0004033104,0.0007241105,0.0009408453,0.00036665282,0.00067049044,0.00059002027,0.0010744322],"category_scores_gemma":[0.008295536,0.00043143547,0.00031433994,0.00067541504,0.0007775135,0.0007508082,0.000563511,0.0009951247,0.00027323878],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00509866,0.013428401,0.23711874,0.0011242004,0.00009388071,0.0019121214,0.038009524,0.014332117,0.4720408,0.0026673658,0.0011722231,0.2130019],"study_design_scores_gemma":[0.00057863706,0.05857071,0.5564487,0.00023623649,0.00015644102,0.0015063529,0.025900759,0.02495369,0.31487975,0.0017977452,0.014652962,0.00031799282],"about_ca_topic_score_codex":0.0036071525,"about_ca_topic_score_gemma":0.00796441,"teacher_disagreement_score":0.005722072,"about_ca_system_score_codex":0.00062468636,"about_ca_system_score_gemma":0.0007971142,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W1998779093","doi":"10.1061/(asce)0733-9364(2004)130:4(613)","title":"Discussion of “Network Creation and Development for Repetitive-Unit Projects” by Kyoo Jin Yi, Hyun-Soo Lee, and Yoon Ki Choi","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Cultural and Historical Studies","field":"Arts and Humanities","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Unit (ring theory); Psychology; Mathematics education","score_opus":0.016328288132855365,"score_gpt":0.19377169566784921,"score_spread":0.17744340753499385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1998779093","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03377273,0.0020390246,0.038706716,0.6115666,0.002209367,0.00017900609,0.000047162834,0.000058517362,0.31142083],"genre_scores_gemma":[0.8905916,0.0026460646,0.013664848,0.024827693,0.0013684899,0.0006558308,0.000047240395,0.00014325377,0.06605495],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9938212,0.0045000506,0.00011191618,0.00036788377,0.0006994089,0.00049949996],"domain_scores_gemma":[0.9924475,0.0051107104,0.00038337437,0.00038688935,0.00088626426,0.00078526454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012427857,0.0005000896,0.00021624034,0.001095821,0.012357173,0.008408162,0.002689837,0.0100068655,0.009995803],"category_scores_gemma":[0.015637234,0.0002879471,0.00059457764,0.0013622254,0.011412291,0.016603,0.0063936166,0.005201957,0.00056561467],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000147891205,0.000020355435,0.00039525898,0.000057502184,0.0000033845517,0.00031231882,0.01776915,0.0005389265,0.000152127,0.9458583,0.02614989,0.008727938],"study_design_scores_gemma":[0.000033809287,0.00003843467,0.0016801999,0.00036287674,0.000014684047,0.00035012193,0.06504282,0.0026942675,0.0009153995,0.20478821,0.72404164,0.000037594134],"about_ca_topic_score_codex":0.0062846285,"about_ca_topic_score_gemma":0.014369424,"teacher_disagreement_score":0.012427857,"about_ca_system_score_codex":0.006183761,"about_ca_system_score_gemma":0.0065682274,"threshold_uncertainty_score":0.065725565},"labels":[],"label_agreement":null},{"id":"W2000923597","doi":"10.1061/(asce)0733-9364(2001)127:4(322)","title":"Improving Design Coordination for Building Projects. I: Information Model","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Component (thermodynamics); Consistency (knowledge bases); Computer science; Process (computing); Set (abstract data type); Design process; Systems engineering; Building information modeling; Conceptual design; Engineering design process; Information model; Hierarchy; Software engineering; Process management; Human–computer interaction; Engineering; Work in process; Artificial intelligence","score_opus":0.008737578101451553,"score_gpt":0.19057015039278882,"score_spread":0.18183257229133726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000923597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01110437,0.00025965276,0.9740918,0.0007843482,0.00006104314,0.00033131448,0.00036013135,0.0019060916,0.011101266],"genre_scores_gemma":[0.18209936,0.0004448199,0.8093338,0.000105226725,0.000039091534,0.00071765407,0.0014766328,0.00028759244,0.005495895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99325925,0.002246529,0.0007191646,0.0009118709,0.0024576378,0.00040544354],"domain_scores_gemma":[0.99238175,0.00264475,0.00075875066,0.0025701355,0.0012809169,0.0003635543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067560356,0.0010217042,0.0012025698,0.0024906097,0.0016977523,0.007306747,0.0035496172,0.0022503436,0.0056385817],"category_scores_gemma":[0.019533426,0.001018434,0.0015891378,0.0033944873,0.0015598647,0.007969474,0.0036812692,0.0015391763,0.0016561372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038510424,0.00038095555,0.0029461978,0.00048766052,0.000098194694,0.00037142693,0.0014959173,0.5041969,0.0046512885,0.26324072,0.013508965,0.20823675],"study_design_scores_gemma":[0.00009906721,0.00015860364,0.0007185157,0.00013110675,0.00009474251,0.00019197521,0.00034080495,0.90152895,0.004695033,0.054425914,0.037552796,0.000062413965],"about_ca_topic_score_codex":0.011680173,"about_ca_topic_score_gemma":0.010874109,"teacher_disagreement_score":0.011680173,"about_ca_system_score_codex":0.00386997,"about_ca_system_score_gemma":0.006141645,"threshold_uncertainty_score":0.035729766},"labels":[],"label_agreement":null},{"id":"W2002097889","doi":"10.1061/(asce)co.1943-7862.0000913","title":"Overdue Invoice Management: Markov Chain Approach","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Canadian Natural Resources; Workers Compensation Board of Alberta; Alberta Environment and Protected Areas","funders":"","keywords":"Invoice; Payment; Business; Interim; Notice; Actuarial science; Operations management; Operations research; Computer science; Finance; Economics; Engineering; Accounting","score_opus":0.017429841384912406,"score_gpt":0.32715196501537513,"score_spread":0.30972212363046275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2002097889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.072310545,0.0013978636,0.9103064,0.0019450085,0.00016299558,0.00051343674,0.0012141919,0.00048545102,0.011664143],"genre_scores_gemma":[0.8823214,0.0021762806,0.09787376,0.00035745837,0.00022983988,0.00087100425,0.0016258168,0.00012543041,0.014419043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974686,0.0011294656,0.00009703487,0.0005061593,0.00031032623,0.0004884241],"domain_scores_gemma":[0.9836765,0.013195868,0.0011722887,0.00027349396,0.0011055283,0.00057633413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063869315,0.0016498443,0.0022857743,0.002150773,0.0011967858,0.00311582,0.0031106598,0.002812744,0.0096959965],"category_scores_gemma":[0.011470479,0.0014822833,0.001996231,0.0019073598,0.0020162766,0.002544028,0.0021908935,0.0028364356,0.0006765517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000800826,0.00006576994,0.0020951647,0.000057643825,0.000054616896,0.000113368355,0.00009634991,0.96124065,0.000167635,0.029741196,0.0007778422,0.005509605],"study_design_scores_gemma":[0.000009166744,0.000018474768,0.00017196887,0.000012868153,0.000017146866,0.000009195297,0.000029510888,0.98894614,0.00004602132,0.010438157,0.0002910532,0.0000104073015],"about_ca_topic_score_codex":0.046443656,"about_ca_topic_score_gemma":0.033611625,"teacher_disagreement_score":0.046443656,"about_ca_system_score_codex":0.0042616813,"about_ca_system_score_gemma":0.0047560595,"threshold_uncertainty_score":0.09234661},"labels":[],"label_agreement":null},{"id":"W2003671662","doi":"10.1061/(asce)co.1943-7862.0000471","title":"Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined Failure Mode and Effect Analysis, Fault Trees, Event Trees, and Fuzzy Logic","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Athabasca University","funders":"","keywords":"Fault tree analysis; Event tree analysis; Event tree; Event (particle physics); Fuzzy logic; Computer science; Failure mode and effects analysis; Risk analysis (engineering); Reliability engineering; Risk management; Reliability (semiconductor); Data mining; Tree (set theory); Engineering; Artificial intelligence; Mathematics","score_opus":0.030918473015656398,"score_gpt":0.3055400824909871,"score_spread":0.27462160947533065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2003671662","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001883594,0.000160786,0.99691606,0.00006455408,0.0000064230417,0.00003170651,0.000022375687,0.0000717289,0.00084269064],"genre_scores_gemma":[0.15340903,0.0006702533,0.84404695,0.00006468021,0.000059412618,0.000257411,0.0001374554,0.000047970123,0.0013068882],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982311,0.0006476092,0.00014131842,0.00023037645,0.00065535575,0.00009422577],"domain_scores_gemma":[0.99857795,0.0008262903,0.00016711233,0.0000744588,0.0002920999,0.00006200475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003531081,0.001336168,0.0007948129,0.0036402564,0.0008031379,0.0027732474,0.0015314725,0.001103457,0.001487914],"category_scores_gemma":[0.0031978546,0.0004559426,0.0016956257,0.0015990409,0.0010562596,0.0025320456,0.0014467983,0.0012784566,0.00026094538],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045475244,0.000098876815,0.001810659,0.000263326,0.0001696317,0.00041349648,0.0007327954,0.5987263,0.0046207304,0.27132833,0.0015230681,0.12026726],"study_design_scores_gemma":[0.000010088919,0.00004602131,0.0005094843,0.00010170632,0.00006703191,0.00013381276,0.00014001955,0.88140297,0.0008188736,0.11167348,0.0050601796,0.000036330555],"about_ca_topic_score_codex":0.0064620413,"about_ca_topic_score_gemma":0.00701809,"teacher_disagreement_score":0.0064620413,"about_ca_system_score_codex":0.0018087744,"about_ca_system_score_gemma":0.0025632456,"threshold_uncertainty_score":0.018674374},"labels":[],"label_agreement":null},{"id":"W2007945516","doi":"10.1061/(asce)0733-9364(2006)132:10(1043)","title":"Conflict Resolution in Construction Disputes Using the Graph Model","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Game Theory and Applications","field":"Decision Sciences","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Compromise; Conflict resolution; Conflict analysis; Order (exchange); Operations research; Resolution (logic); Dispute resolution; Management science; Computer science; Economics; Engineering; Political science; Artificial intelligence; Law; Finance","score_opus":0.036787634739610726,"score_gpt":0.29302883497635923,"score_spread":0.2562412002367485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2007945516","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005886857,0.0001199417,0.9867474,0.0003914339,0.00003389602,0.00014706851,0.00007661992,0.00010992895,0.006486916],"genre_scores_gemma":[0.24580465,0.00065773237,0.7477259,0.00021417155,0.00007588129,0.00080468174,0.00032891743,0.00008225187,0.00430582],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9952076,0.0032430051,0.00021176029,0.0003816339,0.00074158155,0.00021434903],"domain_scores_gemma":[0.99266887,0.005867989,0.00045913667,0.00050468923,0.0003312252,0.00016806947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037938084,0.0010792727,0.0010991661,0.0023292769,0.001559549,0.0037061048,0.0025563682,0.0022212784,0.005098338],"category_scores_gemma":[0.010421849,0.0006040161,0.0023745357,0.0026530104,0.0038036108,0.0051712403,0.0026688208,0.0020894452,0.0006910915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004899762,0.000048273043,0.00033586455,0.00009839533,0.00004031049,0.00029071522,0.0005735713,0.25038376,0.00070707256,0.7320244,0.0011895265,0.014259195],"study_design_scores_gemma":[0.000039394756,0.00003267074,0.000066734545,0.00004074234,0.000020718795,0.00011870913,0.0001849749,0.5275434,0.0002997325,0.46525759,0.006363339,0.000031949738],"about_ca_topic_score_codex":0.0056739314,"about_ca_topic_score_gemma":0.0053002,"teacher_disagreement_score":0.0056739314,"about_ca_system_score_codex":0.002566802,"about_ca_system_score_gemma":0.0026385805,"threshold_uncertainty_score":0.020063818},"labels":[],"label_agreement":null},{"id":"W2016010091","doi":"10.1061/(asce)0733-9364(2005)131:8(938)","title":"Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":118,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Relevance (law); Expert system; Fuzzy logic; Productivity; Computer science; Data mining; Industrial engineering; Artificial intelligence; Machine learning; Engineering; Economics","score_opus":0.011977122586400246,"score_gpt":0.20138050444172867,"score_spread":0.18940338185532843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016010091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5914377,0.00012929252,0.4022873,0.0002848677,0.000023879926,0.00010193623,0.00019064765,0.0005063634,0.0050380663],"genre_scores_gemma":[0.93991446,0.00008788864,0.05897087,0.000022258848,0.000006987978,0.000052922594,0.00013060996,0.0000074048876,0.0008066681],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929833,0.00028606312,0.000048079266,0.00011535377,0.00019776897,0.000054310123],"domain_scores_gemma":[0.9976497,0.0017028167,0.0001637799,0.00011880532,0.0003215815,0.000043335567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017956028,0.0004898623,0.0005259782,0.0010697101,0.0004173118,0.0011400199,0.000643696,0.0009556691,0.001099993],"category_scores_gemma":[0.0073643196,0.00032704353,0.00040560318,0.00077844714,0.00036113273,0.0010049839,0.00040291535,0.00047680415,0.00021054593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006171897,0.00007627238,0.00530915,0.000026001924,0.000024089371,0.00008234735,0.00012795166,0.95747524,0.0012587032,0.0013593646,0.00028989752,0.033909258],"study_design_scores_gemma":[0.0000056424096,0.000021182488,0.0011426349,0.0000064172555,0.0000046602054,0.0000087596445,0.000032984673,0.9967001,0.0005970139,0.0013112578,0.00016114749,0.000008237892],"about_ca_topic_score_codex":0.012812111,"about_ca_topic_score_gemma":0.0106716445,"teacher_disagreement_score":0.012812111,"about_ca_system_score_codex":0.0009710685,"about_ca_system_score_gemma":0.0008530831,"threshold_uncertainty_score":0.025475085},"labels":[],"label_agreement":null},{"id":"W2016917031","doi":"10.1061/(asce)0733-9364(2001)127:6(515)","title":"Closure to “Simplified CPM/PERT Simulation Model” by Ming Lu and Simaan AbouRizk","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Nuclear Materials and Properties","field":"Materials Science","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Closure (psychology); Mathematics; Political science; Law","score_opus":0.007707346758512107,"score_gpt":0.20853765896862306,"score_spread":0.20083031221011094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016917031","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07715374,0.0010543962,0.8192564,0.0018020441,0.0012671984,0.00026757116,0.0015844505,0.0015252086,0.09608891],"genre_scores_gemma":[0.90302587,0.00060931366,0.061428193,0.00059967325,0.00029931194,0.0004888378,0.0013079431,0.0010894237,0.031151455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995239,0.00014987723,0.000022520991,0.00007326534,0.0001538134,0.000076683806],"domain_scores_gemma":[0.99948585,0.00014013007,0.000046326924,0.000112953996,0.00016756362,0.00004718715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041708487,0.0006982307,0.0013071203,0.000506166,0.0010683241,0.0012120976,0.0019286594,0.0015533534,0.008618453],"category_scores_gemma":[0.0023619405,0.0004576587,0.001126525,0.0006443334,0.00079357636,0.0016078991,0.0016838977,0.0012704132,0.0011821716],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009420027,0.00006383582,0.0005499458,0.000087691675,0.00003428551,0.00034161244,0.00007847044,0.9078579,0.0027890664,0.07379123,0.0041202456,0.010191581],"study_design_scores_gemma":[0.000008441858,0.000006199558,0.00006398674,0.0000047966173,0.000004439972,0.000020755535,0.000007174939,0.99203545,0.0004535486,0.0052858437,0.0021036137,0.000005756863],"about_ca_topic_score_codex":0.017548384,"about_ca_topic_score_gemma":0.0046143704,"teacher_disagreement_score":0.017548384,"about_ca_system_score_codex":0.00081468176,"about_ca_system_score_gemma":0.0013897093,"threshold_uncertainty_score":0.0348925},"labels":[],"label_agreement":null},{"id":"W2019386889","doi":"10.1061/(asce)0733-9364(2002)128:2(174)","title":"Unified Modeling Methodology for Construction Simulation","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":193,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Flexibility (engineering); Systems engineering; Software engineering; Software; Management science; Industrial engineering; Engineering; Programming language","score_opus":0.040046077586934486,"score_gpt":0.24185171052688742,"score_spread":0.20180563293995293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019386889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005409058,0.0011988332,0.98968107,0.00028589283,0.00019049055,0.00014358209,0.00014608398,0.00049639976,0.007316805],"genre_scores_gemma":[0.041942213,0.003518362,0.9442558,0.00022278164,0.0001659238,0.0017782083,0.00088665244,0.0003244941,0.0069054766],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971553,0.0013182692,0.0002695011,0.00020091746,0.0009121809,0.00014374926],"domain_scores_gemma":[0.9989679,0.0004158965,0.00008565772,0.00018831051,0.00027805634,0.00006424969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037130427,0.0016975438,0.0016469494,0.0030347435,0.0011393115,0.0028835959,0.0033858872,0.001770947,0.0073370594],"category_scores_gemma":[0.0034499478,0.0008750361,0.0031106537,0.0027040425,0.0012928821,0.0027102756,0.0026970124,0.0024535425,0.001833737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001505545,0.000027118913,0.00016554134,0.00024624055,0.0000692437,0.00012685898,0.00025615888,0.085587464,0.000698729,0.87631994,0.005028534,0.03145909],"study_design_scores_gemma":[0.000051318028,0.00009098121,0.00017829401,0.00039678952,0.000089925015,0.00027170364,0.00016068888,0.33426148,0.0010612924,0.352218,0.31115678,0.00006267393],"about_ca_topic_score_codex":0.004499467,"about_ca_topic_score_gemma":0.004099125,"teacher_disagreement_score":0.0073370594,"about_ca_system_score_codex":0.0020160011,"about_ca_system_score_gemma":0.0034950036,"threshold_uncertainty_score":0.024544895},"labels":[],"label_agreement":null},{"id":"W2023346663","doi":"10.1061/(asce)0733-9364(2005)131:3(354)","title":"Change Orders Impact on Labor Productivity","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"National Evidence-based Healthcare Collaborating Agency","keywords":"Productivity; Change order; Field (mathematics); Computer science; Work (physics); Artificial neural network; Operations research; Industrial engineering; Engineering; Economics; Systems engineering; Project management; Economic growth; Artificial intelligence; Mathematics","score_opus":0.006143367867799938,"score_gpt":0.20308804547351975,"score_spread":0.19694467760571982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023346663","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97422045,0.00011957953,0.019390767,0.00017644299,0.000024741574,0.000073729716,0.00020563086,0.00006505333,0.0057236976],"genre_scores_gemma":[0.99718285,0.0000641714,0.0015194268,0.000012149527,0.000004996032,0.000021183432,0.00008129319,0.0000061447677,0.0011078196],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9979791,0.00050988287,0.00010400423,0.00021359748,0.00090149866,0.00029187882],"domain_scores_gemma":[0.99252725,0.0052914685,0.0009099584,0.0003346509,0.00074847136,0.00018818998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014219317,0.00050186936,0.00042599626,0.00074755657,0.00037181162,0.0012343639,0.00056820887,0.00068448833,0.0033581643],"category_scores_gemma":[0.011375075,0.00027024382,0.00041861465,0.0007297397,0.00057190005,0.0010016337,0.00070204464,0.0007607558,0.00036706706],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090231193,0.0006389888,0.117376916,0.00015250899,0.0000700287,0.00070282037,0.0007168419,0.80073446,0.005960921,0.0026305206,0.0005514365,0.06956223],"study_design_scores_gemma":[0.000033304656,0.00080650835,0.1453893,0.000024682788,0.00004939428,0.0001524488,0.0007612654,0.840105,0.0076087927,0.0032076095,0.0018000304,0.00006166671],"about_ca_topic_score_codex":0.0118954405,"about_ca_topic_score_gemma":0.012798632,"teacher_disagreement_score":0.0118954405,"about_ca_system_score_codex":0.0022280929,"about_ca_system_score_gemma":0.0011007965,"threshold_uncertainty_score":0.023652434},"labels":[],"label_agreement":null},{"id":"W2028704904","doi":"10.1061/(asce)0733-9364(2001)127:6(476)","title":"Applications of Horizontal Characterization Techniques in Trenchless Construction","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Western University","funders":"","keywords":"Trenchless technology; Characterization (materials science); Software deployment; Construction engineering; Computer science; Field (mathematics); Horizontal and vertical; Systems engineering; Work (physics); Representation (politics); Engineering; Civil engineering; Pipeline transport; Geology; Software engineering; Mechanical engineering","score_opus":0.00261671785786741,"score_gpt":0.1784036530515172,"score_spread":0.1757869351936498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028704904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12517005,0.00058471726,0.8627078,0.00013800814,0.000016490521,0.00020732141,0.00023435711,0.00069194584,0.010249237],"genre_scores_gemma":[0.7304901,0.0005526523,0.2661884,0.000026004276,0.000009435971,0.000113067676,0.0002086986,0.00005544453,0.0023562284],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99886596,0.00044941396,0.000054075652,0.00012321977,0.0004228268,0.0000845685],"domain_scores_gemma":[0.9970094,0.0014821078,0.00044943677,0.00039530336,0.00061037217,0.000053407904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010182933,0.000368144,0.00025717338,0.0022853883,0.00043635353,0.00088497985,0.00043810968,0.0004487547,0.0026151575],"category_scores_gemma":[0.0038656986,0.00025783328,0.00021076527,0.0029769582,0.00056154054,0.0009113073,0.0008755419,0.00038391328,0.00044754212],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012461444,0.000087486515,0.03089337,0.0003224377,0.000032925895,0.00031028557,0.0010484109,0.08722244,0.023863237,0.020979222,0.0012194613,0.83389604],"study_design_scores_gemma":[0.000045708814,0.0010147905,0.07637417,0.00038170844,0.00010899562,0.00145594,0.0051387567,0.7028998,0.113686755,0.060742553,0.03791998,0.00023081199],"about_ca_topic_score_codex":0.0048064417,"about_ca_topic_score_gemma":0.007832646,"teacher_disagreement_score":0.0048064417,"about_ca_system_score_codex":0.0005375343,"about_ca_system_score_gemma":0.0009293579,"threshold_uncertainty_score":0.0095568895},"labels":[],"label_agreement":null},{"id":"W2028931726","doi":"10.1061/(asce)co.1943-7862.0000469","title":"Streamlining the Construction Productivity Improvement Process with the Proposed Role of a Construction Productivity Improvement Officer","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Productivity; Context (archaeology); Competitive advantage; Construction industry; Process (computing); Work (physics); Business; Industrial organization; Position (finance); Officer; Engineering; Process management; Operations management; Marketing; Computer science; Construction engineering; Economics; Economic growth; Geography; Finance","score_opus":0.017138898431173416,"score_gpt":0.24388783956031393,"score_spread":0.2267489411291405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028931726","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16033311,0.0018522802,0.57924217,0.11646218,0.0023602801,0.003908926,0.00007714206,0.0011097587,0.13465418],"genre_scores_gemma":[0.74574405,0.001279027,0.21169135,0.003498091,0.0007278761,0.00091530016,0.000067684756,0.00009708438,0.03597952],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98204666,0.0082192505,0.0009000986,0.001820773,0.0041740774,0.0028391387],"domain_scores_gemma":[0.97221786,0.0056868484,0.003969948,0.0018811547,0.008070721,0.008173441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0243531,0.00068691507,0.00051999907,0.0027559078,0.006130978,0.0104980385,0.0024484547,0.0033376731,0.006171799],"category_scores_gemma":[0.024396807,0.000621996,0.00054492673,0.0014240497,0.005219994,0.0067068366,0.008717823,0.0058460133,0.0020687634],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036079,0.0020152882,0.036390044,0.0012834842,0.000079511185,0.0016898956,0.027099125,0.0079384055,0.016331406,0.33329952,0.03070288,0.54280967],"study_design_scores_gemma":[0.00052499725,0.005324629,0.045516025,0.0026308284,0.0002863254,0.0025921355,0.06060232,0.05332549,0.022698455,0.15147135,0.6543953,0.0006321857],"about_ca_topic_score_codex":0.0033386108,"about_ca_topic_score_gemma":0.0043238113,"teacher_disagreement_score":0.0243531,"about_ca_system_score_codex":0.00462856,"about_ca_system_score_gemma":0.03893974,"threshold_uncertainty_score":0.12879306},"labels":[],"label_agreement":null},{"id":"W2029292549","doi":"10.1061/(asce)co.1943-7862.0000916","title":"Location-Aware Scheduling and Control of Linear Projects: Introducing Space-Time Float Prisms","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Scheduling (production processes); Computer science; Operations research; Float (project management); Real-time computing; Space time; Industrial engineering; Simulation; Operations management; Marine engineering; Engineering","score_opus":0.012831717861110809,"score_gpt":0.2549513047224789,"score_spread":0.24211958686136809,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029292549","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014179392,0.00019881854,0.98177755,0.0001211531,0.00008471589,0.00004595779,0.000035483907,0.0001500073,0.0034069472],"genre_scores_gemma":[0.77728814,0.00060901354,0.2182652,0.00010714959,0.00011172204,0.00022008724,0.0000897788,0.00007038128,0.0032384575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994879,0.00013774828,0.000029196526,0.0001189879,0.00014678536,0.00007938195],"domain_scores_gemma":[0.99919575,0.00030613545,0.00019645487,0.000050841063,0.00015567857,0.00009521007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094577036,0.0005319415,0.0005984876,0.00045951788,0.0004486249,0.0010680764,0.0011245973,0.000643512,0.0016924589],"category_scores_gemma":[0.0018339877,0.0004077997,0.0006478217,0.0005447434,0.0010662017,0.0010558346,0.0015918828,0.0010055557,0.000248201],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006867336,0.00003501837,0.0003631667,0.000060482893,0.00001907416,0.00006286971,0.00009149355,0.94982517,0.0034494733,0.027001081,0.00042574108,0.01859781],"study_design_scores_gemma":[0.000008257584,0.000058607642,0.0000828952,0.0000071398854,0.000004974684,0.000009444507,0.000012639182,0.9949722,0.0004056521,0.003175653,0.0012552132,0.000007167775],"about_ca_topic_score_codex":0.006744032,"about_ca_topic_score_gemma":0.0041266754,"teacher_disagreement_score":0.006744032,"about_ca_system_score_codex":0.00067198224,"about_ca_system_score_gemma":0.0014113232,"threshold_uncertainty_score":0.013409555},"labels":[],"label_agreement":null},{"id":"W2031945081","doi":"10.1061/(asce)0733-9364(2005)131:5(591)","title":"Distributed Ontology Architecture for Knowledge Management in Highway Construction","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Ontology; Domain knowledge; Open Knowledge Base Connectivity; Computer science; Knowledge management; Domain (mathematical analysis); Knowledge base; Architecture; Knowledge integration; Knowledge engineering; Knowledge representation and reasoning; Software engineering; Systems engineering; Personal knowledge management; Engineering; World Wide Web; Organizational learning; Artificial intelligence","score_opus":0.007548012099128317,"score_gpt":0.22049472195892794,"score_spread":0.21294670985979963,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031945081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018316524,0.00035952462,0.9677215,0.0014765258,0.00004770235,0.00024805366,0.00011402424,0.0011719534,0.010544167],"genre_scores_gemma":[0.28690848,0.00074263016,0.702947,0.00026579612,0.000041954467,0.00048435386,0.0009834266,0.00013691187,0.007489353],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99770796,0.000766272,0.00033668304,0.00038226976,0.0006361263,0.00017070175],"domain_scores_gemma":[0.99802834,0.0005894505,0.0001593619,0.00055691105,0.00050982827,0.00015612581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048400527,0.0002879795,0.0004957847,0.0019576931,0.0022656345,0.0051175444,0.0019267127,0.0015393697,0.0015685697],"category_scores_gemma":[0.004683565,0.0004819462,0.0009730023,0.0025551647,0.0021428587,0.0065565235,0.0039827656,0.0016070289,0.00054248323],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011016233,0.00026410495,0.0023301148,0.0002458973,0.00011992223,0.00043478835,0.0042261207,0.074791074,0.005391228,0.69280297,0.0064993678,0.2127842],"study_design_scores_gemma":[0.00006663974,0.00005261903,0.0012078647,0.00017523559,0.0001309958,0.00028593512,0.0012841111,0.43899262,0.0045267357,0.44506946,0.10813815,0.0000695799],"about_ca_topic_score_codex":0.01722706,"about_ca_topic_score_gemma":0.023275495,"teacher_disagreement_score":0.01722706,"about_ca_system_score_codex":0.003690408,"about_ca_system_score_gemma":0.00556004,"threshold_uncertainty_score":0.034253538},"labels":[],"label_agreement":null},{"id":"W2034456251","doi":"10.1061/(asce)co.1943-7862.0000665","title":"Managing the Cost of Power Transmission Projects: Lessons Learned","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cost overrun; Delphi method; Cost estimate; Project management triangle; Key (lock); Project management; Project team; Risk analysis (engineering); Engineering management; Work breakdown structure; Delphi; Power transmission; Business; Process management; Computer science; Operations management; Engineering; Knowledge management; Project charter; Power (physics); Systems engineering; Computer security; Construction engineering","score_opus":0.0663122927691005,"score_gpt":0.3339031328265143,"score_spread":0.2675908400574138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034456251","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5554237,0.020539723,0.07629356,0.2775803,0.0015505158,0.0007604033,0.00025004777,0.00025059542,0.067351185],"genre_scores_gemma":[0.8926297,0.029165782,0.062473882,0.0073271175,0.0003240298,0.0001927462,0.00011321816,0.000079796315,0.0076936968],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9935959,0.0034872154,0.00032001766,0.00036591946,0.0016835707,0.0005473156],"domain_scores_gemma":[0.9677908,0.025205618,0.00077296427,0.0006791873,0.0039996095,0.0015518533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011235382,0.0010226546,0.00071950076,0.0011887221,0.0021944488,0.0049531604,0.0031157117,0.0028661268,0.0014302492],"category_scores_gemma":[0.024015144,0.0004733864,0.00045591246,0.0013826216,0.0039245547,0.008024461,0.003033608,0.0042771343,0.00026178418],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013514921,0.0013761752,0.015076747,0.005116209,0.00010980158,0.0032108573,0.08781672,0.011863475,0.0025431907,0.0601682,0.034727536,0.7778559],"study_design_scores_gemma":[0.00015514751,0.0017305473,0.021934837,0.011095935,0.00016209218,0.0032559289,0.43301764,0.025366826,0.010224075,0.21040738,0.2822918,0.00035780072],"about_ca_topic_score_codex":0.01063581,"about_ca_topic_score_gemma":0.018976837,"teacher_disagreement_score":0.011235382,"about_ca_system_score_codex":0.0044002444,"about_ca_system_score_gemma":0.008802002,"threshold_uncertainty_score":0.059419096},"labels":[],"label_agreement":null},{"id":"W2036178893","doi":"10.1061/(asce)0733-9364(2001)127:4(330)","title":"Improving Design Coordination for Building Projects. II: A Collaborative System","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Process (computing); The Internet; Domain (mathematical analysis); Collaborative design; Information sharing; Building information modeling; Design technology; Systems design; Systems engineering; Engineering management; Knowledge management; Software engineering; World Wide Web; Engineering","score_opus":0.006750662511390033,"score_gpt":0.19213729165913487,"score_spread":0.18538662914774484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036178893","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050903365,0.00028342532,0.920798,0.0005622442,0.000115399904,0.0010471847,0.00020318064,0.0131981,0.012889053],"genre_scores_gemma":[0.21466082,0.0002251718,0.7761601,0.00010339837,0.00004320475,0.0007905842,0.00075153966,0.000424639,0.006840527],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99370813,0.0022819967,0.00057218905,0.001392665,0.0016443606,0.00040063562],"domain_scores_gemma":[0.99346256,0.001808881,0.0007172431,0.0022028454,0.0010511739,0.0007573336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0077027837,0.001112857,0.0010173963,0.00252744,0.0023859285,0.005113009,0.0021460555,0.0018743469,0.005620021],"category_scores_gemma":[0.015548933,0.000967875,0.0007676233,0.0024750484,0.0010251934,0.0042355736,0.0058366503,0.0011218196,0.0019457752],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067345955,0.0014734707,0.006402096,0.00051836506,0.00012280868,0.00035476813,0.0052564032,0.05357281,0.025509037,0.021370573,0.017567052,0.86717933],"study_design_scores_gemma":[0.0013180838,0.002852958,0.011854783,0.00048262687,0.00054814754,0.0011670707,0.0038278033,0.6595561,0.07034935,0.03244726,0.21522687,0.00036886215],"about_ca_topic_score_codex":0.003963697,"about_ca_topic_score_gemma":0.0030995465,"teacher_disagreement_score":0.0077027837,"about_ca_system_score_codex":0.0015863156,"about_ca_system_score_gemma":0.0047870157,"threshold_uncertainty_score":0.040736675},"labels":[],"label_agreement":null},{"id":"W2043222413","doi":"10.1061/(asce)0733-9364(2008)134:8(653)","title":"New Mathematical Optimization Model for Construction Site Layout","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Adjacency list; Object (grammar); Process (computing); Function (biology); Visibility; Genetic algorithm; Orientation (vector space); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics; Machine learning","score_opus":0.00806788335009506,"score_gpt":0.18390310381856115,"score_spread":0.17583522046846609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043222413","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016970821,0.00055293686,0.9843513,0.00037892343,0.00008165664,0.0000374529,0.00017632957,0.00010550599,0.012618796],"genre_scores_gemma":[0.33628607,0.0053766267,0.58378327,0.00055208075,0.00040900274,0.0012832908,0.001205542,0.00037230694,0.070731744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918073,0.0002438624,0.000041058014,0.0001643079,0.00028753123,0.00008248088],"domain_scores_gemma":[0.9994129,0.00030693263,0.00007781133,0.00003299198,0.00014595399,0.000023445267],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001359408,0.0014390224,0.0013083895,0.0012885899,0.00066140713,0.002381885,0.0022751107,0.002166364,0.0072300253],"category_scores_gemma":[0.002361817,0.00082525914,0.001644704,0.0020747574,0.0012497999,0.002542031,0.0012515063,0.0020794037,0.0018682273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011353889,0.000019359903,0.000112823756,0.00008421035,0.00001724025,0.00007431013,0.00003989094,0.8691697,0.00051774026,0.119307235,0.0021377543,0.008508286],"study_design_scores_gemma":[0.000007838647,0.000012365299,0.000046402944,0.000010658151,0.00000779996,0.00003558892,0.000008934873,0.97392243,0.00012399716,0.020375868,0.0054398086,0.000008255073],"about_ca_topic_score_codex":0.0059495573,"about_ca_topic_score_gemma":0.005864919,"teacher_disagreement_score":0.0072300253,"about_ca_system_score_codex":0.0023081407,"about_ca_system_score_gemma":0.0018981689,"threshold_uncertainty_score":0.02418679},"labels":[],"label_agreement":null},{"id":"W2043266505","doi":"10.1061/(asce)co.1943-7862.0000298","title":"Construction Engineering Today","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Linnaeus Plant Sciences (Canada)","funders":"","keywords":"Work (physics); Plan (archaeology); Process (computing); Construction engineering; Key (lock); Field (mathematics); Engineering; Engineering management; Computer science; Civil engineering; Computer security; Mechanical engineering; Geography; Archaeology","score_opus":0.006036222721732598,"score_gpt":0.160348930259966,"score_spread":0.1543127075382334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043266505","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034042932,0.016164692,0.010235857,0.036515597,0.00474234,0.00006201384,0.00035826585,0.0008180712,0.9276989],"genre_scores_gemma":[0.021132173,0.01016658,0.0059868577,0.0050035696,0.0008093782,0.00005574833,0.00050524203,0.00022417544,0.9561163],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.996999,0.00027885093,0.00013432471,0.00033120497,0.0019889819,0.00026761243],"domain_scores_gemma":[0.99760145,0.00024072302,0.000112348745,0.00045951142,0.0010372617,0.0005486755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002248565,0.0009088529,0.000459722,0.0013485099,0.0030312252,0.006415427,0.0009215758,0.0031341177,0.23497027],"category_scores_gemma":[0.0031309356,0.0004010127,0.00036343222,0.0024613591,0.0017521383,0.0037201669,0.003576297,0.0029887864,0.14510806],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019010557,0.00011257278,0.0012222975,0.00021659835,0.000007873104,0.00011231167,0.00081164367,0.00037305712,0.0018472676,0.073195234,0.52081364,0.40126857],"study_design_scores_gemma":[6.142127e-7,0.000005472101,0.00030536024,0.000033607233,5.580244e-7,0.00006816693,0.00014355237,0.000028328508,0.000071906805,0.0022166248,0.9971228,0.0000028701756],"about_ca_topic_score_codex":0.003442546,"about_ca_topic_score_gemma":0.009554737,"teacher_disagreement_score":0.23497027,"about_ca_system_score_codex":0.002534776,"about_ca_system_score_gemma":0.004147482,"threshold_uncertainty_score":0.7860539},"labels":[],"label_agreement":null},{"id":"W2044479004","doi":"10.1061/(asce)0733-9364(2003)129:6(698)","title":"Resource Optimization Using Combined Simulation and Genetic Algorithms","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":132,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Genetic algorithm; Software; Set (abstract data type); Mathematical optimization; Resource (disambiguation); Simulation modeling; Simulation software; Industrial engineering; Engineering; Machine learning","score_opus":0.0389053613313472,"score_gpt":0.3042320755583036,"score_spread":0.2653267142269564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044479004","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008116313,0.00017377596,0.9878934,0.000085589585,0.00002238206,0.00004101932,0.000016823255,0.0004557872,0.0031948776],"genre_scores_gemma":[0.4095395,0.0007008302,0.5865725,0.00008138541,0.00006055767,0.00037666454,0.00011406801,0.00015104914,0.0024034954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990828,0.0004435282,0.00003359208,0.00009286436,0.00029295636,0.000054277803],"domain_scores_gemma":[0.99901104,0.00071615295,0.0000704432,0.00007684236,0.00010182211,0.000023662351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001108227,0.0011250837,0.0012131464,0.001451838,0.0004288371,0.0011507598,0.0011927867,0.0011322205,0.0014948957],"category_scores_gemma":[0.0024063385,0.0006193405,0.0009794608,0.0010409267,0.00085441844,0.00105655,0.0008385385,0.00085544854,0.0002777904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013110551,0.00001596031,0.00014527129,0.000014034389,0.000031153995,0.000013323135,0.000011265833,0.9817006,0.00044215063,0.004758219,0.00009588231,0.012759041],"study_design_scores_gemma":[0.000006202395,0.000008931765,0.000022841014,0.000002841053,0.000005406767,0.000004076585,0.0000019266952,0.9977736,0.00018264647,0.0016537448,0.00033503203,0.000002794007],"about_ca_topic_score_codex":0.008212738,"about_ca_topic_score_gemma":0.0058564427,"teacher_disagreement_score":0.008212738,"about_ca_system_score_codex":0.0011428065,"about_ca_system_score_gemma":0.0011840279,"threshold_uncertainty_score":0.016329885},"labels":[],"label_agreement":null},{"id":"W2050557853","doi":"10.1061/(asce)0733-9364(2006)132:4(353)","title":"Constructability Analysis of the Bridge Superstructure Rotation Construction Method in China","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Constructability; Superstructure; Bridge (graph theory); Engineering; Construction engineering; Civil engineering; Transport engineering; Structural engineering","score_opus":0.00286083864786864,"score_gpt":0.19764553974092788,"score_spread":0.19478470109305923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050557853","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8385506,0.00012105438,0.15375784,0.00006290391,0.0000043253326,0.00023961916,0.00008235526,0.000059177233,0.007122148],"genre_scores_gemma":[0.95839643,0.000060795515,0.040371537,0.0000047403146,0.0000028758616,0.00012834059,0.00015102095,0.000011999466,0.00087228237],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965192,0.0011730901,0.00021888354,0.00034663716,0.0015227981,0.00021935288],"domain_scores_gemma":[0.99449086,0.002764899,0.0007597547,0.000674301,0.0011737978,0.00013631971],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049687875,0.0003956678,0.00027840814,0.0024047308,0.0005868789,0.0006819324,0.00043498614,0.00028052105,0.0012584111],"category_scores_gemma":[0.0083643645,0.00020201287,0.0006842167,0.0011920757,0.0010663235,0.00073070946,0.0006297196,0.00027093265,0.00009091381],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00077961775,0.00039857428,0.16111751,0.00045034106,0.00020311185,0.00043880445,0.0031383173,0.27540937,0.031685416,0.05087234,0.0005416858,0.47496492],"study_design_scores_gemma":[0.00011042342,0.0015357281,0.23874491,0.00008236801,0.00018405297,0.0002765409,0.0012385338,0.713614,0.024887163,0.015308521,0.00394468,0.00007303584],"about_ca_topic_score_codex":0.018322209,"about_ca_topic_score_gemma":0.015763573,"teacher_disagreement_score":0.018322209,"about_ca_system_score_codex":0.0025082713,"about_ca_system_score_gemma":0.002232489,"threshold_uncertainty_score":0.036431134},"labels":[],"label_agreement":null},{"id":"W2050969245","doi":"10.1061/(asce)0733-9364(2008)134:5(342)","title":"System of Multiple ANNs for Online Planning of Numerous Building Improvements","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Task (project management); Operations research; Duration (music); Artificial neural network; Resource allocation; Resource (disambiguation); Artificial intelligence; Operations management; Engineering; Systems engineering","score_opus":0.006738364255689303,"score_gpt":0.20273999896697162,"score_spread":0.19600163471128232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050969245","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08026088,0.00047365943,0.8941626,0.0005101574,0.00027132058,0.00025295286,0.0005054384,0.011500362,0.012062586],"genre_scores_gemma":[0.7029044,0.00018751319,0.2876673,0.00026555653,0.00011494449,0.0005383044,0.0005907363,0.0001628537,0.0075682853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952364,0.00008059878,0.000044621804,0.00020596896,0.00008843067,0.000056887187],"domain_scores_gemma":[0.9989103,0.0004847352,0.00012624227,0.00010153715,0.00031784648,0.000059347425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012082043,0.0012365421,0.00096185366,0.0009403931,0.0009144882,0.0012999987,0.0016140983,0.0013013906,0.009617543],"category_scores_gemma":[0.0030133089,0.0008102788,0.0006951066,0.00071177277,0.00037675587,0.0011946117,0.00084101636,0.001180304,0.0018502736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030829976,0.00024228585,0.0031023368,0.00009430253,0.00019229003,0.00016045915,0.00008334083,0.8018312,0.003809422,0.0020352385,0.0027817788,0.18535906],"study_design_scores_gemma":[0.000010797437,0.000020987927,0.00021564335,0.0000049440873,0.000014936359,0.0000099824265,0.0000059099093,0.9981482,0.0005955504,0.0005140628,0.00045287018,0.0000060983766],"about_ca_topic_score_codex":0.016017864,"about_ca_topic_score_gemma":0.021285618,"teacher_disagreement_score":0.016017864,"about_ca_system_score_codex":0.0013451851,"about_ca_system_score_gemma":0.0015254151,"threshold_uncertainty_score":0.032173872},"labels":[],"label_agreement":null},{"id":"W2051469667","doi":"10.1061/(asce)0733-9364(2003)129:3(351)","title":"Closure to “Benefits of Constructability on Construction Projects” by George Jergeas and John Van der Put","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TransCanada (Canada); University of Calgary","funders":"","keywords":"Constructability; George (robot); Closure (psychology); Engineering; Sociology; Political science; Art; Art history; Structural engineering; Law","score_opus":0.02186456095687852,"score_gpt":0.26626213659769243,"score_spread":0.2443975756408139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051469667","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020203466,0.033702906,0.06474138,0.549936,0.0206866,0.00006593191,0.00025691427,0.00019235037,0.31021452],"genre_scores_gemma":[0.78633803,0.01670361,0.017104855,0.044620093,0.021619428,0.00028660172,0.0002413875,0.00077703194,0.112308934],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99489415,0.0023424735,0.0002465817,0.00069836766,0.0013880412,0.00043053075],"domain_scores_gemma":[0.9807328,0.012788408,0.0009339119,0.0016920994,0.0032624204,0.000590367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004865009,0.0006506847,0.0008254825,0.0015572328,0.0032901932,0.005685309,0.0014987513,0.004871736,0.010925547],"category_scores_gemma":[0.040579114,0.00054751814,0.0007904511,0.0024617657,0.011867941,0.011994596,0.005415975,0.008752087,0.0015192102],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035396235,0.000020740754,0.000145049,0.000049579747,0.0000090178955,0.000034748904,0.00085295213,0.0008421668,0.00005391926,0.92791194,0.05658585,0.013458511],"study_design_scores_gemma":[0.000012354575,0.000008968887,0.00026617246,0.000107432075,0.000007834718,0.000027390488,0.00034543438,0.0007087218,0.00010103509,0.86739534,0.13100162,0.000017694665],"about_ca_topic_score_codex":0.009891897,"about_ca_topic_score_gemma":0.007520647,"teacher_disagreement_score":0.010925547,"about_ca_system_score_codex":0.004131478,"about_ca_system_score_gemma":0.0025857354,"threshold_uncertainty_score":0.036549628},"labels":[],"label_agreement":null},{"id":"W2051691704","doi":"10.1061/(asce)0733-9364(2006)132:8(882)","title":"Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Geotechnical Engineering and Analysis","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bayesian probability; Novelty; Computer science; Bayesian inference; Quality (philosophy); Variable-order Bayesian network; Data mining; Machine learning; Industrial engineering; Artificial intelligence; Engineering","score_opus":0.0025258646518967216,"score_gpt":0.18277806442737538,"score_spread":0.18025219977547866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051691704","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.476958,0.00018576981,0.51395845,0.0006639065,0.00003251213,0.00013650274,0.0001439536,0.0007309016,0.0071900007],"genre_scores_gemma":[0.89202285,0.00013413034,0.10682518,0.00003634499,0.000007965151,0.000064382715,0.00006682318,0.000042352145,0.0008000276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885666,0.0007894424,0.000044784705,0.000074225594,0.00018596569,0.000048942828],"domain_scores_gemma":[0.99252665,0.0062736934,0.00028862318,0.00018649314,0.0006228662,0.00010179646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033476653,0.00043098867,0.0005817331,0.00046076003,0.00058290473,0.0009908619,0.00064966077,0.000971509,0.0010673404],"category_scores_gemma":[0.012666136,0.00049267686,0.0003712557,0.0006813201,0.00057955703,0.0007130811,0.0008950692,0.00090137037,0.000078481586],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028201064,0.000021855823,0.0016479889,0.000012929527,0.000009788222,0.000038872327,0.00008916126,0.9871983,0.00036450004,0.0026900151,0.00007290453,0.0078254575],"study_design_scores_gemma":[0.0000059889235,0.0000140275215,0.00028663763,0.000004490436,0.0000036661443,0.00000551125,0.000014265922,0.9985227,0.00021403281,0.00074761885,0.00017565492,0.000005446278],"about_ca_topic_score_codex":0.0702533,"about_ca_topic_score_gemma":0.062025584,"teacher_disagreement_score":0.9297467,"about_ca_system_score_codex":0.0011691883,"about_ca_system_score_gemma":0.0017560265,"threshold_uncertainty_score":0.13968879},"labels":[],"label_agreement":null},{"id":"W2052282146","doi":"10.1061/(asce)0733-9364(2007)133:1(96)","title":"CTAN for Risk Assessments Using Multilevel Stochastic Networks","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Schedule; Scope (computer science); Computer science; Realization (probability); Operations research; Stochastic simulation; Risk analysis (engineering); Engineering","score_opus":0.041782369891244286,"score_gpt":0.3396303362319099,"score_spread":0.2978479663406656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052282146","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050890907,0.000042822034,0.99128133,0.00016315929,0.000018189266,0.00006439448,0.0002028456,0.0003873339,0.0027508067],"genre_scores_gemma":[0.2959425,0.00030292754,0.6992716,0.00009053614,0.000054928754,0.00069759437,0.0008617307,0.00016408083,0.0026139987],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837315,0.000790082,0.00009750819,0.00017671683,0.00049463264,0.00006790298],"domain_scores_gemma":[0.9957247,0.0026172895,0.00039678617,0.00040050584,0.00072588044,0.00013483153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022084035,0.00067134463,0.0005739237,0.0015880686,0.0006150558,0.0017974311,0.001186814,0.0008385945,0.00585486],"category_scores_gemma":[0.013001874,0.00043048096,0.0011474709,0.0014205844,0.00046114298,0.0019457205,0.0015136653,0.0013411574,0.0007443456],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028221,0.000019984738,0.0013027729,0.000031257292,0.000032799184,0.000046608817,0.000039589184,0.9098826,0.00060113554,0.06204058,0.0011510875,0.024823355],"study_design_scores_gemma":[0.0000029705807,0.0000053311182,0.00008577747,0.0000064169376,0.0000033652357,0.000006059724,0.000006075087,0.9853608,0.00012667831,0.013258983,0.0011342047,0.0000033382228],"about_ca_topic_score_codex":0.014762683,"about_ca_topic_score_gemma":0.01297918,"teacher_disagreement_score":0.014762683,"about_ca_system_score_codex":0.0019284923,"about_ca_system_score_gemma":0.0023813036,"threshold_uncertainty_score":0.0293535},"labels":[],"label_agreement":null},{"id":"W2052621624","doi":"10.1061/(asce)co.1943-7862.0000224","title":"SuretyAssist: Fuzzy Expert System to Assist Surety Underwriters in Evaluating Construction Contractors for Bonding","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Surety; Underwriting; Fuzzy logic; Process (computing); Work (physics); Expert system; Risk analysis (engineering); Actuarial science; Computer science; Engineering; Construction engineering; Business; Artificial intelligence; Finance","score_opus":0.009430282465756085,"score_gpt":0.23643158085498223,"score_spread":0.22700129838922614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052621624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15582943,0.00031154466,0.80924886,0.00051377155,0.000113500435,0.00094069145,0.0016532298,0.020657176,0.01073179],"genre_scores_gemma":[0.43528217,0.00017698719,0.5566326,0.00022309423,0.000029583623,0.00039705815,0.0011981413,0.00016055518,0.0058999113],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923646,0.00023072747,0.00009993621,0.00015065745,0.00024032783,0.000041899188],"domain_scores_gemma":[0.9974891,0.0012176083,0.00016820918,0.0001649411,0.0008538633,0.000106211104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027545004,0.0006329233,0.0008608379,0.0015982898,0.0006412413,0.0010656959,0.0010334364,0.0012340706,0.007270917],"category_scores_gemma":[0.0070379195,0.00040639154,0.00034055658,0.00051691465,0.00030083797,0.0011172668,0.000795918,0.00053295266,0.001529704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020212152,0.0007429699,0.012435268,0.0006535476,0.00018131944,0.0010702496,0.0014828361,0.13511308,0.05338603,0.0060858545,0.04004658,0.7467811],"study_design_scores_gemma":[0.00017743805,0.00023435072,0.0045154644,0.00010455056,0.00006171102,0.00040022907,0.0002806716,0.96242875,0.01603754,0.0038138279,0.011845905,0.00009958755],"about_ca_topic_score_codex":0.007046909,"about_ca_topic_score_gemma":0.010088825,"teacher_disagreement_score":0.007270917,"about_ca_system_score_codex":0.00087437977,"about_ca_system_score_gemma":0.0014464498,"threshold_uncertainty_score":0.024323583},"labels":[],"label_agreement":null},{"id":"W2052764147","doi":"10.1061/(asce)0733-9364(2006)132:2(143)","title":"Computer-Aided Site Layout Planning","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Representation (politics); Reuse; Interconnectivity; Computer Aided Design; Visualization; Object (grammar); Domain (mathematical analysis); Knowledge base; Process (computing); Engineering drawing; Data mining; Programming language; Artificial intelligence; Engineering","score_opus":0.003312205326125199,"score_gpt":0.16839096680295146,"score_spread":0.16507876147682626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052764147","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011070868,0.00019235686,0.96225387,0.000108463886,0.000034619366,0.00013010876,0.0009457363,0.005055385,0.020208538],"genre_scores_gemma":[0.3094526,0.00067045813,0.66392016,0.000052802494,0.000015856496,0.00051229005,0.0024924465,0.0006569738,0.022226457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943393,0.00008986265,0.000024155868,0.00008118909,0.00033556702,0.000035133547],"domain_scores_gemma":[0.9996184,0.00015893925,0.000025487698,0.00007911229,0.00009756187,0.000020359126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037515792,0.00073187053,0.0008136577,0.0010044896,0.00045675284,0.0016020302,0.0016677505,0.001008565,0.016242947],"category_scores_gemma":[0.00090633857,0.0005617381,0.0007527479,0.0010689701,0.000420081,0.00097563997,0.00083871436,0.00046344992,0.002774387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007938891,0.000055492943,0.00079432427,0.00016462148,0.000021124544,0.00017080516,0.00017152863,0.8709279,0.00545225,0.015548228,0.0063021365,0.10031234],"study_design_scores_gemma":[0.00002691801,0.000030293639,0.000423111,0.000026984917,0.000015548683,0.00015720024,0.000043780128,0.95742506,0.0038291828,0.003580747,0.03441134,0.000029824094],"about_ca_topic_score_codex":0.011645111,"about_ca_topic_score_gemma":0.017826676,"teacher_disagreement_score":0.016242947,"about_ca_system_score_codex":0.0010299747,"about_ca_system_score_gemma":0.0015714467,"threshold_uncertainty_score":0.054338098},"labels":[],"label_agreement":null},{"id":"W2053272969","doi":"10.1061/(asce)0733-9364(2003)129:4(405)","title":"Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":140,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Toronto","funders":"","keywords":"Rework; Artificial neural network; Absolute deviation; Computer science; Standard deviation; Regression analysis; Reliability engineering; Engineering; Data mining; Statistics; Artificial intelligence; Machine learning; Mathematics","score_opus":0.05207126550196439,"score_gpt":0.3023404797402309,"score_spread":0.25026921423826654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053272969","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8396911,0.00069187686,0.15702412,0.00058657874,0.000041491832,0.0000721777,0.0002614274,0.00025872837,0.0013724852],"genre_scores_gemma":[0.9814953,0.00032220554,0.017407218,0.000028848968,0.000020294263,0.000042568445,0.00021940997,0.0000119320985,0.00045224704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991147,0.00042068944,0.0000727116,0.000115556286,0.00019304774,0.00008328654],"domain_scores_gemma":[0.9943598,0.0045415587,0.00044723335,0.00011232873,0.00046452164,0.00007458405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025337082,0.00075924245,0.0006496357,0.0013662265,0.00022052813,0.00089350477,0.000607774,0.0009900909,0.0005056315],"category_scores_gemma":[0.011442731,0.00036458066,0.0004173474,0.0015262383,0.00030024085,0.001128987,0.00041622022,0.00091047544,0.00015245388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011242889,0.00010681365,0.025340067,0.00003556598,0.0000559222,0.000042726904,0.00003309406,0.9430005,0.00029379848,0.000462457,0.00024763966,0.03026902],"study_design_scores_gemma":[0.0000028926734,0.000014858538,0.0016232069,0.000005014462,0.0000038012267,0.000004984938,0.000015189327,0.99789447,0.00012257663,0.00027273849,0.000036473983,0.0000038279873],"about_ca_topic_score_codex":0.013881333,"about_ca_topic_score_gemma":0.008063902,"teacher_disagreement_score":0.013881333,"about_ca_system_score_codex":0.00075395394,"about_ca_system_score_gemma":0.00058547215,"threshold_uncertainty_score":0.027601063},"labels":[],"label_agreement":null},{"id":"W2060112169","doi":"10.1061/(asce)0733-9364(2008)134:8(575)","title":"Delay Analysis under Multiple Baseline Updates","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Baseline (sea); Critical path method; Computer science; Schedule; Static timing analysis; Representation (politics); Resource (disambiguation); Operations research; Industrial engineering; Real-time computing; Systems engineering; Engineering; Computer network; Embedded system; Operating system","score_opus":0.03354328673415646,"score_gpt":0.2782210340739991,"score_spread":0.24467774733984266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060112169","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25031656,0.00034808813,0.7428392,0.00019306348,0.00004879851,0.00009851018,0.0003429148,0.00047988087,0.0053330013],"genre_scores_gemma":[0.9790288,0.00020003255,0.018245872,0.000012937402,0.000018753139,0.000049236867,0.00012534262,0.000054677505,0.0022642221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989157,0.00015352218,0.00004548163,0.00024299367,0.0004283834,0.00021398132],"domain_scores_gemma":[0.9958877,0.0022918107,0.0006843408,0.00024728882,0.0007413979,0.00014753564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016079067,0.0005994415,0.00055488304,0.0011253441,0.0003214491,0.00095724507,0.00094515516,0.00049668056,0.002447579],"category_scores_gemma":[0.008267347,0.00031308585,0.00043797752,0.0009091326,0.00048442936,0.002070331,0.00056628516,0.0007398454,0.00023050584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021233996,0.000039957275,0.0048187035,0.000064031075,0.00002519848,0.00021312002,0.00015662104,0.9359909,0.007408902,0.0217775,0.0004872175,0.028805565],"study_design_scores_gemma":[0.0000074567392,0.00006827902,0.001533523,0.000004728947,0.000014036429,0.000054431322,0.000058509173,0.99049485,0.00204864,0.0049471487,0.0007556948,0.000012747145],"about_ca_topic_score_codex":0.011700671,"about_ca_topic_score_gemma":0.0043882616,"teacher_disagreement_score":0.011700671,"about_ca_system_score_codex":0.00171463,"about_ca_system_score_gemma":0.0016330571,"threshold_uncertainty_score":0.023265123},"labels":[],"label_agreement":null},{"id":"W2061577898","doi":"10.1061/(asce)0733-9364(2008)134:5(311)","title":"Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Truck; Robustness (evolution); Duration (music); Resource (disambiguation); Discrete event simulation; Operations research; Resource allocation; Transport engineering; Engineering; Productivity; Computer science; Simulation; Automotive engineering","score_opus":0.009381056740152972,"score_gpt":0.2097687753113331,"score_spread":0.20038771857118012,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061577898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9637313,0.0002651584,0.010663829,0.0008352039,0.000026890326,0.00033927866,0.00028360338,0.00009257908,0.023762189],"genre_scores_gemma":[0.9715612,0.00039292834,0.01598903,0.00009410013,0.000018838089,0.00024087934,0.00026557545,0.00003108033,0.011406386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99875915,0.00046413371,0.000047471072,0.00012056792,0.00035004626,0.00025856518],"domain_scores_gemma":[0.99895155,0.0004879691,0.00010176566,0.00006673592,0.0001916828,0.00020011989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015426596,0.00084497646,0.00061978464,0.0012945357,0.0025486422,0.001592891,0.0016014156,0.0024280874,0.0045995843],"category_scores_gemma":[0.0020778251,0.00043135183,0.00074465456,0.0013900799,0.00074251567,0.0009682194,0.000997321,0.0008470462,0.00039890173],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00089452695,0.0037764192,0.030049823,0.0003559562,0.00014395619,0.024836777,0.0025647783,0.83319515,0.009955183,0.027677536,0.010128613,0.056421276],"study_design_scores_gemma":[0.000406748,0.0027212815,0.027605716,0.00010980504,0.00013061278,0.0035486412,0.0063616717,0.90269965,0.009488911,0.0057864874,0.04099097,0.0001495288],"about_ca_topic_score_codex":0.042819712,"about_ca_topic_score_gemma":0.07442326,"teacher_disagreement_score":0.95718026,"about_ca_system_score_codex":0.0033646917,"about_ca_system_score_gemma":0.0032810331,"threshold_uncertainty_score":0.08514094},"labels":[],"label_agreement":null},{"id":"W2066635672","doi":"10.1061/(asce)co.1943-7862.0000907","title":"Identification of Invariant Average Weighted Haul Distance to Simplify Earthmoving Simulation Modeling in Planning Site Grading Operations","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Grid; Grading (engineering); Computer science; Heuristic; Simulation modeling; Industrial engineering; Simulation; Data mining; Operations research; Engineering; Artificial intelligence; Mathematics; Civil engineering","score_opus":0.007575520161491659,"score_gpt":0.20808722381658107,"score_spread":0.2005117036550894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066635672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056141075,0.0000457617,0.941559,0.000030134894,0.000014140762,0.00005412871,0.000029024062,0.00013824584,0.0019884955],"genre_scores_gemma":[0.8068275,0.000090024485,0.19229269,0.000011402176,0.000006473806,0.000087976485,0.000058715686,0.000051645904,0.0005736114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934214,0.00025603923,0.000042546784,0.00010016997,0.00019929519,0.0000597535],"domain_scores_gemma":[0.9985097,0.0007907517,0.00021979521,0.0001993804,0.00021933559,0.000060916936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013248503,0.0005208781,0.0006658568,0.0006167908,0.00036101262,0.0011322313,0.0010570735,0.0004934387,0.0008726706],"category_scores_gemma":[0.0035524652,0.00040614078,0.00059471314,0.00071940373,0.00059881544,0.0011978386,0.0009725022,0.00076596934,0.00015458092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018257984,0.00002397169,0.0011203886,0.00001840608,0.0000075953103,0.000022506072,0.000029192288,0.9785942,0.0012424234,0.0054498683,0.000059913546,0.01341328],"study_design_scores_gemma":[0.0000012437173,0.000011130767,0.00014377858,0.0000016736587,0.0000018922636,0.000004837187,0.0000068115223,0.9986797,0.000404955,0.0005854387,0.00015592198,0.0000026187208],"about_ca_topic_score_codex":0.008516093,"about_ca_topic_score_gemma":0.0064452956,"teacher_disagreement_score":0.008516093,"about_ca_system_score_codex":0.0008894492,"about_ca_system_score_gemma":0.0014159967,"threshold_uncertainty_score":0.016933084},"labels":[],"label_agreement":null},{"id":"W2072962544","doi":"10.1061/(asce)co.1943-7862.0000239","title":"Computerized DSS for Construction Conflict Resolution under Uncertainty","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Conflict resolution; Resolution (logic); Conflict analysis; Decision support system; Computer science; Dispute resolution; Graph; Operations research; Management science; Risk analysis (engineering); Engineering; Data mining; Business; Artificial intelligence; Political science; Law","score_opus":0.035427843735406486,"score_gpt":0.3063257624975377,"score_spread":0.2708979187621312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072962544","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05923513,0.00023830464,0.9247512,0.0005767952,0.00009918046,0.0008071366,0.0012642832,0.004130906,0.008896977],"genre_scores_gemma":[0.47539923,0.0003593189,0.5194451,0.00007139502,0.000026707596,0.0012577993,0.0009662856,0.00008859125,0.0023854934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847513,0.00086823374,0.00013908933,0.00013755492,0.0003284415,0.000051562045],"domain_scores_gemma":[0.9954211,0.0032535961,0.00023581675,0.0003517,0.0006589821,0.00007880302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022953104,0.00074841944,0.0009176229,0.0012860573,0.00083425007,0.0019551022,0.0014930947,0.0010315464,0.006304373],"category_scores_gemma":[0.007878716,0.00042574617,0.0005770653,0.0014637726,0.0005960708,0.0016899117,0.00096543477,0.0010340362,0.000615169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002508361,0.00014563357,0.0015146176,0.00023391623,0.000060945556,0.00020541584,0.00045922745,0.87675285,0.002883431,0.02783071,0.0031107336,0.08655172],"study_design_scores_gemma":[0.0000915588,0.000060628794,0.00023478808,0.000033489938,0.000019768753,0.00002744562,0.00009259435,0.983115,0.0015482018,0.008837961,0.0059160437,0.000022558697],"about_ca_topic_score_codex":0.005823862,"about_ca_topic_score_gemma":0.004686791,"teacher_disagreement_score":0.006304373,"about_ca_system_score_codex":0.0017066183,"about_ca_system_score_gemma":0.0022227005,"threshold_uncertainty_score":0.02109027},"labels":[],"label_agreement":null},{"id":"W2073090751","doi":"10.1061/(asce)co.1943-7862.0000770","title":"Operational Performance of Sustainable Measures in Public Buildings","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Impact of Light on Environment and Health","field":"Environmental Science","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Illinois Department of Transportation","keywords":"Carbon footprint; Environmental economics; Electricity; Efficient energy use; Sustainability; Daylight; Water efficiency; Energy consumption; Architectural engineering; Business; Engineering; Greenhouse gas","score_opus":0.005358440470606088,"score_gpt":0.17744568776141825,"score_spread":0.17208724729081215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073090751","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913118,0.00015202902,0.000580479,0.000062801744,0.0000052561995,0.000027741833,0.000062778505,0.000026169928,0.007771116],"genre_scores_gemma":[0.9992335,0.000050831928,0.00025173387,0.000006243421,0.0000027776232,0.0000091335,0.00006735511,0.0000027252242,0.000375723],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99560577,0.0017342047,0.00027134203,0.00025569205,0.0016431292,0.0004899185],"domain_scores_gemma":[0.99286795,0.0022813778,0.0015427552,0.00066702056,0.0021005012,0.00054041087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035114132,0.00031056552,0.00021460783,0.0009887816,0.0005874573,0.0015951981,0.0003524047,0.00026721822,0.0022991956],"category_scores_gemma":[0.0079982905,0.00013930441,0.00032579625,0.0015596465,0.00061397697,0.001214329,0.0011833931,0.00025370825,0.0003795868],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090896746,0.003141649,0.63353914,0.0003813474,0.00026310925,0.00015916994,0.0074972264,0.02043281,0.0077536707,0.0048156264,0.0026704345,0.3184368],"study_design_scores_gemma":[0.000037669437,0.003998103,0.9430002,0.00009608345,0.00008395675,0.00009262957,0.018285083,0.010922855,0.008260886,0.0015524604,0.013604036,0.000066009045],"about_ca_topic_score_codex":0.009267366,"about_ca_topic_score_gemma":0.012051349,"teacher_disagreement_score":0.009267366,"about_ca_system_score_codex":0.0025470133,"about_ca_system_score_gemma":0.0013991977,"threshold_uncertainty_score":0.018570364},"labels":[],"label_agreement":null},{"id":"W2076344120","doi":"10.1061/(asce)0733-9364(2006)132:12(1254)","title":"Decision Tree Modeling Using Integrated Multilevel Stochastic Networks","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Decision tree; Scope (computer science); Decision support system; Probabilistic logic; Tree (set theory); Graph; Shortest path problem; Path (computing); Operations research; Data mining; Theoretical computer science; Artificial intelligence; Engineering; Mathematics","score_opus":0.004813900431287237,"score_gpt":0.18469815881048607,"score_spread":0.17988425837919883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2076344120","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076652556,0.00014841209,0.9895,0.00014703836,0.000016268252,0.00003811269,0.0001572689,0.00014171159,0.002186039],"genre_scores_gemma":[0.5576764,0.0012790276,0.43562454,0.00012783415,0.00009383297,0.0005163531,0.0007380475,0.00008665602,0.003857286],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982352,0.00089253654,0.00009626519,0.00025517435,0.0004142483,0.00010653085],"domain_scores_gemma":[0.9969599,0.0021932183,0.00031194458,0.0001267824,0.0003222433,0.00008596658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018306132,0.0007032084,0.00091209344,0.0013633189,0.00047190773,0.0016853719,0.0011691315,0.0007995333,0.003723866],"category_scores_gemma":[0.006248906,0.00045344303,0.001253224,0.0015737391,0.0005685792,0.002053429,0.0010477338,0.0013395477,0.00043189453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020762402,0.000015610067,0.00049844896,0.000028851231,0.00003507843,0.000035539815,0.00003322204,0.9356748,0.0002503276,0.04899045,0.00032560073,0.014091235],"study_design_scores_gemma":[0.0000031741786,0.000007751382,0.0000490498,0.00000496192,0.000006298452,0.000005282878,0.0000036755578,0.9818652,0.000050872703,0.017531544,0.00046920023,0.0000028544823],"about_ca_topic_score_codex":0.009231935,"about_ca_topic_score_gemma":0.009022727,"teacher_disagreement_score":0.009231935,"about_ca_system_score_codex":0.0017275697,"about_ca_system_score_gemma":0.0012225314,"threshold_uncertainty_score":0.018356383},"labels":[],"label_agreement":null},{"id":"W2077431125","doi":"10.1061/(asce)0733-9364(2009)135:10(948)","title":"Optimization of Earthmoving Operations in Heavy Civil Engineering Projects","year":2009,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scope (computer science); Engineering; Heavy equipment; Earthworks; Linear programming; Work (physics); Operations research; Transport engineering; Civil engineering; Construction engineering; Industrial engineering; Computer science; Mechanical engineering","score_opus":0.00511049594227624,"score_gpt":0.17592038487605335,"score_spread":0.1708098889337771,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077431125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5521669,0.00034937207,0.43159786,0.00031236114,0.000023782484,0.00017391068,0.0003145514,0.00025436614,0.0148068275],"genre_scores_gemma":[0.96778274,0.00023204274,0.027685951,0.00002594975,0.000004027062,0.00012745112,0.00015890495,0.00006361004,0.003919381],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970716,0.000102511294,0.000010228538,0.000042591848,0.00005541336,0.000082022176],"domain_scores_gemma":[0.99966145,0.00019773125,0.00005040769,0.0000130283515,0.00003960898,0.000037865684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006245378,0.0006606225,0.0009215741,0.00052722887,0.00045695927,0.0012042554,0.0005872664,0.001056483,0.0023283914],"category_scores_gemma":[0.0011224091,0.00061937654,0.0006278346,0.0007074842,0.00054435205,0.00096076657,0.0006507049,0.00062912813,0.00019637766],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011874946,0.000009562757,0.00022970041,0.000006554435,0.0000029551381,0.000013744145,0.0000053139297,0.9979317,0.00014238028,0.00028830263,0.00004396365,0.0013139198],"study_design_scores_gemma":[0.0000066718667,0.00003565505,0.0003468364,0.0000031186307,0.000004387468,0.000006653085,0.000027428894,0.99862707,0.0002378551,0.0005280938,0.00017226428,0.000003984881],"about_ca_topic_score_codex":0.017523713,"about_ca_topic_score_gemma":0.0145774605,"teacher_disagreement_score":0.017523713,"about_ca_system_score_codex":0.0011573143,"about_ca_system_score_gemma":0.0012923178,"threshold_uncertainty_score":0.034843385},"labels":[],"label_agreement":null},{"id":"W2082299583","doi":"10.1061/(asce)0733-9364(2007)133:11(880)","title":"Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":186,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"National Institute for Occupational Safety and Health; National Institute of Standards and Technology; National Science Foundation","keywords":"Computer science; Real-time computing; Frame rate; Grid; Frame (networking); Video tracking; Occupancy; Occupancy grid mapping; Range (aeronautics); Tracking (education); Field (mathematics); Object (grammar); Computer vision; Artificial intelligence; Engineering","score_opus":0.011008866471493612,"score_gpt":0.1953466806789443,"score_spread":0.1843378142074507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082299583","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024960024,0.00006996377,0.9729901,0.0000397076,0.000015474081,0.000021094886,0.00011950041,0.0009859432,0.0007981454],"genre_scores_gemma":[0.6930156,0.00020002546,0.30419672,0.000029831474,0.000012890072,0.00014782115,0.00038663048,0.00012273822,0.0018877741],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996953,0.00009161617,0.000014447838,0.000055942724,0.00011104392,0.000031624102],"domain_scores_gemma":[0.99950135,0.0002566526,0.000060952083,0.000076608245,0.000072412084,0.00003189167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004670664,0.0004207059,0.0005746725,0.0006474683,0.00038039061,0.0007219246,0.0011015681,0.00055226486,0.0016665981],"category_scores_gemma":[0.0015721425,0.00044497338,0.000658154,0.00078230555,0.00034537748,0.00075132604,0.0004893253,0.00039318146,0.0005001604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013444782,0.00006609016,0.0044791223,0.00008257804,0.00004390746,0.000090063055,0.00017978295,0.9035954,0.0064461823,0.0044381963,0.0010752042,0.079368986],"study_design_scores_gemma":[0.0000021477138,0.000006675943,0.0003235016,0.000002131925,0.0000029977436,0.000020419895,0.000009967609,0.9981962,0.0006822121,0.00042415256,0.00032393594,0.0000057571583],"about_ca_topic_score_codex":0.017688703,"about_ca_topic_score_gemma":0.025984216,"teacher_disagreement_score":0.017688703,"about_ca_system_score_codex":0.0005943377,"about_ca_system_score_gemma":0.0009757376,"threshold_uncertainty_score":0.03517145},"labels":[],"label_agreement":null},{"id":"W2086411192","doi":"10.1061/(asce)co.1943-7862.0000722","title":"Fast and Near-Optimum Schedule Optimization for Large-Scale Projects","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Computer science; Mathematical optimization; Metaheuristic; Scheduling (production processes); Set (abstract data type); Scale (ratio); Resource (disambiguation); Operations research; Engineering; Algorithm; Mathematics","score_opus":0.01978522260025422,"score_gpt":0.27043634731529653,"score_spread":0.2506511247150423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2086411192","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036841027,0.00025053616,0.9595012,0.00014066637,0.000023155133,0.00006083914,0.0000852408,0.0001540269,0.002943323],"genre_scores_gemma":[0.5801617,0.00054566405,0.4159595,0.00005869371,0.000028231356,0.0002658246,0.0002687259,0.00015322176,0.0025585128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994386,0.0002658049,0.000017527736,0.00007294134,0.00013085567,0.00007432772],"domain_scores_gemma":[0.9987117,0.000915064,0.00013795804,0.0000573863,0.000117130134,0.000060682403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015836722,0.0007276755,0.0008531945,0.00066538394,0.00046239173,0.0007452857,0.0007600804,0.00086166186,0.0020713687],"category_scores_gemma":[0.0034775732,0.0006366012,0.0007903324,0.0012856286,0.00043549377,0.0010277026,0.0006620425,0.0012794086,0.00020793187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015522646,0.000014405789,0.000090187525,0.000027517133,0.0000073328893,0.000012938746,0.000012243689,0.9890486,0.0003817586,0.0031202626,0.00027843635,0.006990823],"study_design_scores_gemma":[0.000004558747,0.000021468208,0.000050392136,0.0000029360092,0.0000021541105,0.0000054523716,0.000011172081,0.99692374,0.00018547082,0.0024320127,0.00035858268,0.0000020943905],"about_ca_topic_score_codex":0.00786141,"about_ca_topic_score_gemma":0.008587259,"teacher_disagreement_score":0.00786141,"about_ca_system_score_codex":0.00096984394,"about_ca_system_score_gemma":0.0020786962,"threshold_uncertainty_score":0.015631318},"labels":[],"label_agreement":null},{"id":"W2089830378","doi":"10.1061/(asce)0733-9364(2005)131:1(42)","title":"Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":82,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Fuzzy logic; Computer science; Relevance (law); Scheduling (production processes); Operations research; Logic model; Industrial engineering; Reliability engineering; Systems engineering; Artificial intelligence; Engineering; Operations management","score_opus":0.031851007892089396,"score_gpt":0.2972117784881596,"score_spread":0.2653607705960702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2089830378","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002790982,0.0001372318,0.9932033,0.00010923327,0.000033763685,0.000048566042,0.00008348515,0.00015163107,0.0034418192],"genre_scores_gemma":[0.2926862,0.0009415919,0.6975049,0.00013636438,0.00014655065,0.00038880936,0.0003859063,0.00007588532,0.007733854],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987446,0.0003511422,0.000090644324,0.00022595315,0.0004845291,0.00010305364],"domain_scores_gemma":[0.9985176,0.00084051123,0.00018796803,0.00007873307,0.00032847992,0.000046671383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020692537,0.0010982555,0.00089123077,0.0019548342,0.00086698664,0.002060289,0.0021781435,0.0013480271,0.004078723],"category_scores_gemma":[0.004420558,0.0006089009,0.0013342777,0.0016967867,0.0007592852,0.0020843262,0.00067681,0.0016249833,0.00080395304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073670206,0.00006783594,0.0006584354,0.00009607755,0.000052576514,0.00013246392,0.0001768703,0.8530269,0.0014322184,0.07841665,0.0010676364,0.064798646],"study_design_scores_gemma":[0.000014389677,0.000028943357,0.00009189543,0.000017025,0.000022642804,0.00003277101,0.00002489851,0.97294486,0.00048881763,0.023408236,0.0029043937,0.000021129077],"about_ca_topic_score_codex":0.02236094,"about_ca_topic_score_gemma":0.014766207,"teacher_disagreement_score":0.02236094,"about_ca_system_score_codex":0.0030489347,"about_ca_system_score_gemma":0.0026527706,"threshold_uncertainty_score":0.044461608},"labels":[],"label_agreement":null},{"id":"W2090252087","doi":"10.1061/(asce)0733-9364(2005)131:9(993)","title":"Technical Knowledge Consolidation using Theory of Inventive Problem Solving","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Consolidation (business); Profitability index; Contradiction; Process (computing); Asset (computer security); Domain knowledge; Domain (mathematical analysis); Knowledge management; Management science; Engineering; Mathematics; Business","score_opus":0.0086191784857593,"score_gpt":0.2112510238382955,"score_spread":0.2026318453525362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090252087","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01412578,0.00057266426,0.9703311,0.0006783647,0.000037309863,0.0002650455,0.000034703164,0.00013238285,0.013822686],"genre_scores_gemma":[0.2288685,0.001139182,0.76573074,0.00019086016,0.000053881424,0.0007259505,0.0001860893,0.000038058624,0.0030666636],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99537164,0.0018769195,0.0004924541,0.0006359387,0.0014294492,0.00019363781],"domain_scores_gemma":[0.9880822,0.008698109,0.0006930811,0.0012688392,0.001122156,0.00013565838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064884573,0.0008835547,0.0011607419,0.0075216326,0.0012218282,0.0066459873,0.002715489,0.0014801592,0.0036209028],"category_scores_gemma":[0.01472247,0.00069393346,0.0022671346,0.003408698,0.0064870925,0.010449424,0.0044114827,0.0022240279,0.00047647973],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003131489,0.0001766421,0.0017248668,0.00050373084,0.00013761914,0.0003135794,0.0050772983,0.035436995,0.0013318416,0.8009957,0.0010000864,0.1532703],"study_design_scores_gemma":[0.000050777766,0.00006729931,0.0006600749,0.00027775762,0.00006210976,0.00035067878,0.0019637803,0.18794985,0.0028633187,0.78728926,0.018405596,0.000059383],"about_ca_topic_score_codex":0.001588498,"about_ca_topic_score_gemma":0.0017569857,"teacher_disagreement_score":0.0075216326,"about_ca_system_score_codex":0.00264964,"about_ca_system_score_gemma":0.0029279958,"threshold_uncertainty_score":0.034314632},"labels":[],"label_agreement":null},{"id":"W2091432426","doi":"10.1061/(asce)co.1943-7862.0000250","title":"Tunnel-Boring Machine Positioning during Microtunneling Operations through Integrating Automated Data Collection with Real-Time Computing","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Inertial Sensor and Navigation","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Computer science; Point (geometry); Software; Simulation; Field (mathematics); Rotation (mathematics); Position (finance); Monte Carlo method; Real-time computing; Computer vision","score_opus":0.0036741042059247244,"score_gpt":0.20571017358609742,"score_spread":0.20203606938017268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091432426","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.079846345,0.00011899466,0.91562307,0.00008935352,0.000034605815,0.00010279831,0.00008697868,0.002432759,0.0016650085],"genre_scores_gemma":[0.54751754,0.00011376309,0.4510479,0.00003157975,0.000026121677,0.00011024468,0.0001509884,0.0001042537,0.0008976031],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995264,0.000089855705,0.00002350724,0.00009398065,0.00023465368,0.00003176359],"domain_scores_gemma":[0.99908245,0.00027437203,0.00019115055,0.00019383199,0.00022910433,0.00002899161],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042977344,0.0005394766,0.00049826154,0.00056956714,0.0003256795,0.0005710421,0.0008657649,0.00031799136,0.0011735489],"category_scores_gemma":[0.0015596932,0.00026027972,0.00018129307,0.000620797,0.00032098027,0.00073454133,0.00041025615,0.00028693286,0.00037463772],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005238976,0.00014025622,0.009926604,0.00036035207,0.000040878123,0.00017043862,0.00064563315,0.096622325,0.15478481,0.0022734297,0.0016315277,0.73287976],"study_design_scores_gemma":[0.00011420752,0.00070818135,0.01913604,0.00006731391,0.00006801547,0.00047578983,0.00034693113,0.8290009,0.13201982,0.0024133858,0.015544462,0.00010495613],"about_ca_topic_score_codex":0.002232487,"about_ca_topic_score_gemma":0.00461563,"teacher_disagreement_score":0.002232487,"about_ca_system_score_codex":0.00029969204,"about_ca_system_score_gemma":0.000784688,"threshold_uncertainty_score":0.0044389963},"labels":[],"label_agreement":null},{"id":"W2094757630","doi":"10.1061/(asce)0733-9364(2001)127:6(502)","title":"Estimating Labor Production Rates for Industrial Construction Activities","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":96,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Artificial neural network; Multiplier (economics); Production (economics); Estimator; Industrial production index; Production rate; Computer science; Index (typography); Industrial engineering; Econometrics; Engineering; Operations research; Statistics; Artificial intelligence; Economics; Mathematics; Microeconomics","score_opus":0.009529319624809076,"score_gpt":0.21381794424264855,"score_spread":0.20428862461783948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094757630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2202917,0.0004907726,0.77436984,0.000088212575,0.00003061583,0.000108421824,0.00041749995,0.00040812933,0.003794815],"genre_scores_gemma":[0.7334292,0.00078292814,0.26202756,0.000017628941,0.000033156146,0.00016704846,0.0008140489,0.00010154269,0.0026269753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99856013,0.00044365798,0.00009548064,0.0003025056,0.00054315646,0.00005507014],"domain_scores_gemma":[0.99705637,0.0014222222,0.0006562816,0.00030646482,0.0005231849,0.000035451798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021465875,0.0009158637,0.0005748073,0.001599213,0.0002487959,0.0007199915,0.0007637056,0.00045618523,0.00078800943],"category_scores_gemma":[0.010232768,0.00046589674,0.00039320262,0.001357669,0.00020422105,0.0012535594,0.0004159261,0.0005217024,0.00034000524],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012757958,0.00010592032,0.05469012,0.00020398828,0.00008068689,0.000054238128,0.00015318443,0.6925728,0.0050344598,0.0035449374,0.0006824175,0.24274978],"study_design_scores_gemma":[0.000011946366,0.00011828381,0.026135191,0.0000532752,0.000034550358,0.000055080625,0.00010416016,0.95335317,0.011646155,0.004762996,0.003676669,0.000048583595],"about_ca_topic_score_codex":0.0078073177,"about_ca_topic_score_gemma":0.011064905,"teacher_disagreement_score":0.0078073177,"about_ca_system_score_codex":0.0010008429,"about_ca_system_score_gemma":0.0008621941,"threshold_uncertainty_score":0.015523732},"labels":[],"label_agreement":null},{"id":"W2096977665","doi":"10.1061/(asce)0733-9364(2003)129:2(173)","title":"Object-oriented Simulation Model for Earthmoving Operations","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Simulation Techniques and Applications","field":"Decision Sciences","cited_by":97,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Component (thermodynamics); Process (computing); Software; Object (grammar); Discrete event simulation; Component Object Model; Computer science; Object-oriented programming; Engineering; Simulation software; Event (particle physics); Orientation (vector space); Simulation; Operating system","score_opus":0.042176040108512884,"score_gpt":0.339975003183009,"score_spread":0.2977989630744961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096977665","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023341993,0.00018474468,0.9619501,0.00022020808,0.000063986365,0.00019152893,0.0004876113,0.00080142275,0.012758432],"genre_scores_gemma":[0.588672,0.0014381493,0.3816893,0.00015666807,0.00008048009,0.0014454601,0.0023685577,0.0003719822,0.023777448],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950767,0.0001557554,0.0000459739,0.00006417904,0.00017276875,0.00005368643],"domain_scores_gemma":[0.99933475,0.0003265832,0.000081445934,0.00006278954,0.00015667228,0.000037727135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086745725,0.0008342683,0.0006902872,0.000878291,0.00058355986,0.0017992442,0.0016727694,0.0014035351,0.004160511],"category_scores_gemma":[0.0017044602,0.00041907202,0.0010442392,0.00091347675,0.000513731,0.0012563654,0.0006808255,0.00092814164,0.000984203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022422599,0.000024015,0.0004028721,0.000019489938,0.0000142490835,0.000054640554,0.000044140783,0.9746105,0.00039267377,0.020795837,0.00028748592,0.0033316512],"study_design_scores_gemma":[0.0000101057685,0.000009309143,0.00006554527,0.0000050091344,0.0000071254885,0.000012188454,0.0000088897605,0.9926052,0.00019880678,0.004161046,0.0029118592,0.0000048730367],"about_ca_topic_score_codex":0.0139371,"about_ca_topic_score_gemma":0.0075408216,"teacher_disagreement_score":0.0139371,"about_ca_system_score_codex":0.001153565,"about_ca_system_score_gemma":0.001676003,"threshold_uncertainty_score":0.027711928},"labels":[],"label_agreement":null},{"id":"W2097369068","doi":"10.1061/(asce)co.1943-7862.0000483","title":"Heuristic Method for Satisfying Both Deadlines and Resource Constraints","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Heuristic; Scheduling (production processes); Software; Resource (disambiguation); Process (computing); Set (abstract data type); Operations research; Software engineering; Mathematical optimization; Operating system; Programming language; Artificial intelligence; Engineering","score_opus":0.0693014588953265,"score_gpt":0.3304401048909163,"score_spread":0.2611386459955898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097369068","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009493223,0.00019914606,0.9865736,0.00006334636,0.000034665092,0.00022262477,0.000052591506,0.00024514334,0.0031157655],"genre_scores_gemma":[0.15275995,0.00025258385,0.8447287,0.000056502493,0.000024229035,0.00045779138,0.00015910846,0.000072886156,0.0014882359],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984364,0.00063782674,0.00009932583,0.00017948574,0.0005002313,0.000146634],"domain_scores_gemma":[0.9977977,0.0015262385,0.00021388376,0.000117106,0.0002600098,0.00008511538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020892355,0.00086104346,0.0007854556,0.0017130908,0.0006375794,0.00092718226,0.0013126926,0.00073949614,0.0039731963],"category_scores_gemma":[0.0042356905,0.00048655842,0.00079732423,0.0013452382,0.0005723717,0.0009390398,0.00074663456,0.0008090695,0.00044939856],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019966422,0.00020942398,0.00097175123,0.00046185745,0.00009669957,0.0002230485,0.00025805054,0.7271671,0.0068151983,0.03707452,0.0029578547,0.2235648],"study_design_scores_gemma":[0.000108979606,0.00017582036,0.0002501985,0.000049268743,0.000044570577,0.00018355207,0.00009715855,0.97475046,0.0037280358,0.013976455,0.006605307,0.000030227211],"about_ca_topic_score_codex":0.0029092806,"about_ca_topic_score_gemma":0.004326142,"teacher_disagreement_score":0.0039731963,"about_ca_system_score_codex":0.0009814841,"about_ca_system_score_gemma":0.0033896079,"threshold_uncertainty_score":0.013291657},"labels":[],"label_agreement":null},{"id":"W2100550918","doi":"10.1061/(asce)0733-9364(2005)131:5(513)","title":"Keeping Better Site Records Using Intelligent Bar Charts","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Bar chart; Computer science; Chart; Schedule; Pie chart; Scheduling (production processes); Process (computing); Bar (unit); Software; Data mining; Operations research; Software engineering; Engineering; Operations management; Programming language; Operating system","score_opus":0.04199328297439458,"score_gpt":0.3790554372117501,"score_spread":0.3370621542373555,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100550918","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04715774,0.0006830666,0.8757098,0.00082029146,0.0004131375,0.001359639,0.005810057,0.058811348,0.009234904],"genre_scores_gemma":[0.23925747,0.00081789686,0.7418814,0.00015315214,0.00035386506,0.0007769508,0.00983919,0.0019082127,0.005011793],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9888875,0.0030129375,0.0019106757,0.0018614439,0.0039360737,0.00039138115],"domain_scores_gemma":[0.93948835,0.015213345,0.0074419994,0.018875934,0.017753327,0.0012270489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0092666345,0.0014047613,0.0013363017,0.0078004207,0.0013757083,0.0055796634,0.0026817482,0.0010982266,0.0047996496],"category_scores_gemma":[0.043013517,0.0007680038,0.0005285567,0.006574634,0.0005542783,0.0053253886,0.001823973,0.0018067515,0.004015561],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010507435,0.00048281264,0.021839892,0.00061724795,0.000098639845,0.00046672058,0.002412873,0.033370435,0.017012162,0.011285449,0.032241065,0.87912184],"study_design_scores_gemma":[0.0005230448,0.0009237318,0.04767623,0.00086442835,0.00036243832,0.0009723915,0.002027154,0.50816864,0.11204881,0.024518533,0.30072275,0.0011918552],"about_ca_topic_score_codex":0.0075668925,"about_ca_topic_score_gemma":0.0061190478,"teacher_disagreement_score":0.0092666345,"about_ca_system_score_codex":0.0014078707,"about_ca_system_score_gemma":0.002443381,"threshold_uncertainty_score":0.049007237},"labels":[],"label_agreement":null},{"id":"W2105760447","doi":"10.1061/(asce)0733-9364(2001)127:3(183)","title":"Cost Optimization in Projects with Repetitive Nonserial Activities","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":150,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Crew; Scheduling (production processes); Operations research; Novelty; Total cost; Software; Reliability engineering; Engineering; Operations management","score_opus":0.035848616329094876,"score_gpt":0.2890536171455027,"score_spread":0.25320500081640784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105760447","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08966384,0.00025970943,0.8989763,0.00033490645,0.000026478792,0.00019358587,0.00031773082,0.000183438,0.010043951],"genre_scores_gemma":[0.84772784,0.0006683582,0.13863084,0.000051561303,0.000024511653,0.0007451564,0.0004008212,0.0001211771,0.011629675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99919766,0.00032245106,0.00002702704,0.00013217826,0.00019262075,0.00012811986],"domain_scores_gemma":[0.9993,0.00039570857,0.00011982132,0.00003706762,0.000091720496,0.000055609067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011636534,0.00085418567,0.0009841645,0.00068694056,0.0004872339,0.0015129866,0.0015025409,0.0014201076,0.0036489],"category_scores_gemma":[0.0023069135,0.00082807406,0.0007258668,0.0012298235,0.00074630347,0.001396951,0.0006498019,0.00097349647,0.0003971143],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008097487,0.000008466903,0.00009331236,0.000009552634,0.0000031783786,0.000014177311,0.0000071769728,0.99408036,0.000084663334,0.003730801,0.00007962734,0.0018804271],"study_design_scores_gemma":[0.000006666971,0.000015914724,0.00009888771,0.0000030679314,0.000003078811,0.0000072230696,0.000009401694,0.9959804,0.00008200526,0.0034177809,0.0003723632,0.0000032589137],"about_ca_topic_score_codex":0.014045061,"about_ca_topic_score_gemma":0.011691186,"teacher_disagreement_score":0.014045061,"about_ca_system_score_codex":0.0021130352,"about_ca_system_score_gemma":0.0024009952,"threshold_uncertainty_score":0.027926624},"labels":[],"label_agreement":null},{"id":"W2106623194","doi":"10.1061/(asce)co.1943-7862.0000637","title":"Assessing the Market Potential for Housing Construction Products in Mexico","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; BP (Canada)","funders":"","keywords":"Profitability index; Business; Product (mathematics); Globalization; Work (physics); Supply chain; Market analysis; Industrial organization; Service (business); Process (computing); Marketing; Environmental economics; Engineering; Economics; Finance; Computer science","score_opus":0.036254737356960845,"score_gpt":0.3137930025157408,"score_spread":0.27753826515878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106623194","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966732,0.00011101453,0.00011354802,0.000026179234,6.0605856e-7,0.000012368896,0.00006728813,0.0000012610716,0.0029945637],"genre_scores_gemma":[0.9988444,0.00015787146,0.00039363574,0.000004154233,0.0000016148647,0.00001036734,0.000121273835,7.987385e-7,0.0004658212],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995858,0.00010142564,0.00002739946,0.000046896614,0.00016054885,0.000077931894],"domain_scores_gemma":[0.9978787,0.0010819494,0.00054406846,0.000023797953,0.00039799282,0.00007348343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018846715,0.00016181527,0.00013895852,0.0031116756,0.00065015844,0.0012965921,0.00026181038,0.00035157116,0.0025706526],"category_scores_gemma":[0.0029001806,0.00014362794,0.00021159321,0.0013807879,0.0004268157,0.001196668,0.00057331903,0.0001845488,0.00012791887],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047736775,0.00031477516,0.9359454,0.00029394214,0.000053652784,0.0014634023,0.0049817017,0.0019222434,0.008728271,0.0032270486,0.00047834392,0.04211388],"study_design_scores_gemma":[0.000009929915,0.00042901284,0.97306937,0.000049119182,0.0000501547,0.00022911691,0.017415574,0.0024916094,0.002447075,0.000337716,0.003455546,0.000015800852],"about_ca_topic_score_codex":0.011775157,"about_ca_topic_score_gemma":0.022872362,"teacher_disagreement_score":0.011775157,"about_ca_system_score_codex":0.0015413505,"about_ca_system_score_gemma":0.0006007868,"threshold_uncertainty_score":0.02341324},"labels":[],"label_agreement":null},{"id":"W2107379846","doi":"10.1061/(asce)co.1943-7862.0000556","title":"Ergonomic Analysis and the Need for Its Integration for Planning and Assessing Construction Tasks","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Musculoskeletal pain and rehabilitation","field":"Medicine","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Legislation; Human factors and ergonomics; Productivity; Occupational safety and health; Work (physics); Musculoskeletal disorder; Engineering; Risk analysis (engineering); Work-related musculoskeletal disorders; Business; Operations management; Poison control; Applied psychology; Environmental health; Psychology; Medicine; Economics; Political science","score_opus":0.009226625003204321,"score_gpt":0.26888506315743016,"score_spread":0.25965843815422585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107379846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20883225,0.028162474,0.6255605,0.014095433,0.0009841728,0.002237631,0.004645803,0.005446482,0.110035285],"genre_scores_gemma":[0.40323293,0.011882174,0.5732125,0.0007456188,0.00036356284,0.00050671597,0.0018830505,0.00023237153,0.007941067],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99640226,0.00084982533,0.0003486846,0.0002555588,0.0019977335,0.00014580146],"domain_scores_gemma":[0.9902728,0.0024921927,0.00082273263,0.00082157145,0.0051635536,0.0004272113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048334314,0.001135927,0.00092642184,0.0064581363,0.0012452442,0.004130599,0.001594476,0.00092364557,0.0026971395],"category_scores_gemma":[0.010634816,0.00051436084,0.001011391,0.004108571,0.0013221041,0.0022476322,0.0014516218,0.0009921229,0.0008871141],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018135786,0.00027029408,0.12634425,0.0015577271,0.00018885951,0.0002522796,0.002347423,0.017473089,0.009211549,0.00732845,0.007640124,0.8272045],"study_design_scores_gemma":[0.000043686035,0.00083186926,0.7312646,0.0025853517,0.00037499465,0.0019008546,0.010912406,0.06240986,0.0048478027,0.02215282,0.16217762,0.0004981326],"about_ca_topic_score_codex":0.25541776,"about_ca_topic_score_gemma":0.3348926,"teacher_disagreement_score":0.25541776,"about_ca_system_score_codex":0.0030254438,"about_ca_system_score_gemma":0.017034464,"threshold_uncertainty_score":0.5078621},"labels":[],"label_agreement":null},{"id":"W2111532474","doi":"10.1061/(asce)co.1943-7862.0000457","title":"Quantitative Method for Updating Cost Contingency throughout Project Execution","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workers Compensation Board of Alberta; University of Alberta","funders":"","keywords":"Timeline; Cost contingency; Project management; Earned value management; Contingency; Computer science; Resource (disambiguation); Set (abstract data type); Project planning; Contingency plan; Operations research; Project management triangle; Risk analysis (engineering); Engineering; Systems engineering; Project charter; Business","score_opus":0.11854106557661641,"score_gpt":0.3959825683608168,"score_spread":0.2774415027842004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2111532474","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019556081,0.000032456166,0.9965726,0.00002363124,0.000022984008,0.000036966943,0.0000870115,0.0005334438,0.0007352383],"genre_scores_gemma":[0.19101109,0.0001393045,0.8062842,0.000041278156,0.00006203893,0.00028282308,0.0004203475,0.00022364336,0.0015353218],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99703884,0.0007842406,0.00016538332,0.00045340945,0.0014678075,0.00009042109],"domain_scores_gemma":[0.9919744,0.0042076,0.0009957385,0.00083087006,0.0018360042,0.00015547728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003142646,0.001058445,0.0007520359,0.0032587813,0.0004987393,0.0012588815,0.0013782844,0.00058050954,0.0034457634],"category_scores_gemma":[0.0139076095,0.0006289362,0.0005383067,0.0017341601,0.0005541687,0.0017255584,0.0007301401,0.0013613675,0.0007633043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023957058,0.00012139815,0.004166242,0.0002556915,0.000114037466,0.000117113115,0.00026173235,0.45094624,0.010660752,0.02615563,0.003518836,0.5034428],"study_design_scores_gemma":[0.000027336508,0.00008787298,0.0012648707,0.000034587938,0.000028045744,0.00010396197,0.000040885625,0.97995764,0.0046541053,0.008866453,0.004872061,0.00006213859],"about_ca_topic_score_codex":0.004165259,"about_ca_topic_score_gemma":0.0030255113,"teacher_disagreement_score":0.004165259,"about_ca_system_score_codex":0.00087317545,"about_ca_system_score_gemma":0.0013104322,"threshold_uncertainty_score":0.01662004},"labels":[],"label_agreement":null},{"id":"W2117624816","doi":"10.1061/(asce)co.1943-7862.0000326","title":"Discussion of “Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search” by Zong Woo Geem","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Probabilistic and Robust Engineering Design","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Harmony search; Harmony (color); Multi-objective optimization; Mathematical optimization; Computer science; Mathematical economics; Economics; Mathematics; Art","score_opus":0.04287800904839086,"score_gpt":0.2659047987145206,"score_spread":0.22302678966612974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2117624816","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013884033,0.018788224,0.8079737,0.06455209,0.004650793,0.00019162586,0.000115482835,0.00010380098,0.089740284],"genre_scores_gemma":[0.60179186,0.018744666,0.26271868,0.021643605,0.004159434,0.0009474184,0.00013377244,0.0002741387,0.089586504],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99929774,0.00038228926,0.000026782978,0.00008728422,0.00015484421,0.00005095013],"domain_scores_gemma":[0.9994186,0.0004076179,0.000039738465,0.000033981585,0.00007735674,0.000022639639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002393921,0.000514906,0.000752623,0.00041848063,0.00079651014,0.0013067139,0.0014483401,0.0023303118,0.0068567246],"category_scores_gemma":[0.0050180587,0.00035885532,0.0011902387,0.0010233549,0.0015240315,0.0018589062,0.0014092932,0.0019111172,0.0005539474],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006802013,0.000036302798,0.00028702588,0.00028292084,0.00010284749,0.0002713459,0.00022047537,0.15675335,0.00065572304,0.76192164,0.039687436,0.03971291],"study_design_scores_gemma":[0.00007769536,0.0001489713,0.0005689448,0.0003114403,0.000064737185,0.00019725763,0.00021954907,0.33345208,0.0009810156,0.5183383,0.14557546,0.000064516964],"about_ca_topic_score_codex":0.003215535,"about_ca_topic_score_gemma":0.0030911318,"teacher_disagreement_score":0.0068567246,"about_ca_system_score_codex":0.0010206695,"about_ca_system_score_gemma":0.0008116478,"threshold_uncertainty_score":0.022937953},"labels":[],"label_agreement":null},{"id":"W2122351176","doi":"10.1061/(asce)0733-9364(2005)131:2(168)","title":"Graphical Approach for Manpower Planning in Infrastructure Networks","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Scheduling (production processes); Operations research; Engineering; Operations management","score_opus":0.0034224390620060416,"score_gpt":0.18411934413907768,"score_spread":0.18069690507707165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122351176","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00081119826,0.000120900506,0.99540305,0.00011868743,0.000025140665,0.00003213008,0.000104256455,0.00019767179,0.0031868706],"genre_scores_gemma":[0.14334735,0.0012864029,0.84464884,0.00025470424,0.00015211332,0.00053543557,0.000578099,0.000259877,0.008937236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985446,0.00088992587,0.000052973046,0.00019842335,0.00022638345,0.00008774621],"domain_scores_gemma":[0.9981844,0.0013274814,0.00011600482,0.000115927294,0.00018491822,0.000071265604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013620205,0.0012921516,0.0008696305,0.0020036995,0.0006983116,0.0024058644,0.0016066832,0.0012230129,0.011254108],"category_scores_gemma":[0.004215552,0.0009065412,0.0017373303,0.0022123693,0.0013796877,0.0018619037,0.0013151158,0.0015925765,0.0017200403],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052639632,0.000030324114,0.00039377486,0.00015650142,0.00004241314,0.00021794128,0.00012774029,0.67944676,0.0011548022,0.2703146,0.0038944175,0.04416813],"study_design_scores_gemma":[0.000019455441,0.000025899664,0.000135566,0.000028686203,0.000019999134,0.00007097235,0.0000401961,0.8428604,0.000505686,0.14547342,0.010793741,0.000025954183],"about_ca_topic_score_codex":0.008085737,"about_ca_topic_score_gemma":0.012812894,"teacher_disagreement_score":0.011254108,"about_ca_system_score_codex":0.0019194202,"about_ca_system_score_gemma":0.001302305,"threshold_uncertainty_score":0.037648737},"labels":[],"label_agreement":null},{"id":"W2127396715","doi":"10.1061/(asce)0733-9364(2003)129:4(396)","title":"Genetic Optimization for Dynamic Project Control","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Schedule; Computer science; Earned value management; Cash flow; Scheduling (production processes); Resource leveling; Genetic algorithm; Project management; Operations research; Project planning; Industrial engineering; Mathematical optimization; Systems engineering; Engineering; Operations management","score_opus":0.002866054542077819,"score_gpt":0.17880501614989378,"score_spread":0.17593896160781597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127396715","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041598827,0.00036627185,0.9863511,0.00027029455,0.000044751705,0.00003368408,0.000070312315,0.00011806234,0.008585758],"genre_scores_gemma":[0.71335495,0.001932575,0.25796363,0.00028537674,0.00013078527,0.0007525154,0.00034684586,0.00014454867,0.025088757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946874,0.00019122192,0.000018128138,0.000098942335,0.00015868586,0.00006426571],"domain_scores_gemma":[0.99958044,0.0002474523,0.000053779717,0.000024055675,0.00007273981,0.0000216777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010139737,0.0009815983,0.00093884976,0.0006709593,0.00041912796,0.0011614298,0.0010251718,0.001194841,0.0037715235],"category_scores_gemma":[0.0019601143,0.0003669929,0.0006912127,0.0008963788,0.0013021041,0.00088967255,0.00065350626,0.0012549541,0.00054434943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061803735,0.000008302552,0.000049272054,0.000010581579,0.000008419122,0.000014576546,0.0000115311295,0.9512468,0.00010034891,0.043133,0.00034088167,0.0050701033],"study_design_scores_gemma":[0.0000070870724,0.000008199436,0.000030436808,0.000004108452,0.0000031159532,0.0000057764996,0.000003571303,0.9717782,0.00004861576,0.026666438,0.0014407637,0.0000038197963],"about_ca_topic_score_codex":0.010701943,"about_ca_topic_score_gemma":0.0063903523,"teacher_disagreement_score":0.010701943,"about_ca_system_score_codex":0.0022612507,"about_ca_system_score_gemma":0.0015487146,"threshold_uncertainty_score":0.021279335},"labels":[],"label_agreement":null},{"id":"W2133047147","doi":"10.1061/(asce)0733-9364(2004)130:3(330)","title":"Environmental Management Systems and ISO 14001 Certification for Construction Firms","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":108,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bombardier (Canada)","funders":"","keywords":"Certification; Environmental management system; Business; Work (physics); Management system; Environmental consulting; Environmental resource management; Risk analysis (engineering); Engineering management; Environmental economics; Operations management; Engineering; Environmental science; Management; Economics","score_opus":0.005427593279957059,"score_gpt":0.18718840971155964,"score_spread":0.18176081643160258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2133047147","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5108558,0.004719453,0.017867189,0.030894065,0.00024275295,0.0002031659,0.00020363026,0.00018541684,0.4348286],"genre_scores_gemma":[0.9841553,0.0011300058,0.0050390875,0.0004895332,0.000051332754,0.000044653232,0.00019829639,0.000016242191,0.008875572],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9955818,0.0013557075,0.0002317257,0.00019312282,0.002016422,0.0006212447],"domain_scores_gemma":[0.9893693,0.0041019944,0.0019925924,0.0004962836,0.0033454876,0.0006942279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033803054,0.00018256303,0.00011845982,0.0015833902,0.0016581402,0.0042060786,0.0004955775,0.0017623829,0.0037527299],"category_scores_gemma":[0.01634886,0.00016973123,0.00014230832,0.0023032299,0.002145099,0.0038232196,0.0016656996,0.0011791004,0.00031230063],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011660267,0.0005036251,0.06335985,0.000313254,0.000011780181,0.00090232934,0.0030254978,0.013305486,0.0027003498,0.66125697,0.0193925,0.2351117],"study_design_scores_gemma":[0.000108718006,0.00086514413,0.32572192,0.0011071252,0.0000484759,0.001172125,0.020324782,0.0268877,0.0061892243,0.27442387,0.34292287,0.00022802936],"about_ca_topic_score_codex":0.021568716,"about_ca_topic_score_gemma":0.029618265,"teacher_disagreement_score":0.021568716,"about_ca_system_score_codex":0.007165587,"about_ca_system_score_gemma":0.009905885,"threshold_uncertainty_score":0.05199015},"labels":[],"label_agreement":null},{"id":"W2135181737","doi":"10.1061/(asce)co.1943-7862.0000212","title":"Critical Path Segments Scheduling Technique","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Critical path method; Computer science; Path (computing); Scheduling (production processes); Computer network; Operations management; Engineering; Economics; Management","score_opus":0.002922300650782879,"score_gpt":0.19368919785716082,"score_spread":0.19076689720637793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135181737","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007229076,0.0001502057,0.98737097,0.00009862791,0.00006611733,0.00024498935,0.0000753297,0.00055240176,0.004212192],"genre_scores_gemma":[0.30640838,0.00043975172,0.6852815,0.00012394556,0.0001372791,0.000501162,0.0003446355,0.0002720554,0.006491255],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897075,0.00025642905,0.000056960023,0.00023290643,0.0003630949,0.0001199699],"domain_scores_gemma":[0.9985815,0.0005630863,0.00023392,0.00021067674,0.00032514753,0.000085766136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011781069,0.0008149232,0.0005772015,0.0015795646,0.00084977905,0.0008188651,0.0014248047,0.0005941273,0.006808138],"category_scores_gemma":[0.002652879,0.00038763572,0.00063850585,0.0016264963,0.00075098104,0.001166943,0.00088024215,0.0011569494,0.0010283568],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006473118,0.00017489765,0.002492055,0.00048983854,0.00010868158,0.00034299286,0.0007149724,0.2602876,0.03478136,0.16931127,0.012622874,0.5180261],"study_design_scores_gemma":[0.00017444672,0.0008035607,0.0014120559,0.00010535931,0.00010018588,0.00055277394,0.00022979538,0.79651064,0.039295703,0.07176937,0.08895628,0.00008974097],"about_ca_topic_score_codex":0.0033194623,"about_ca_topic_score_gemma":0.0025630214,"teacher_disagreement_score":0.006808138,"about_ca_system_score_codex":0.0010280071,"about_ca_system_score_gemma":0.002765979,"threshold_uncertainty_score":0.022775471},"labels":[],"label_agreement":null},{"id":"W2135572933","doi":"10.1061/(asce)co.1943-7862.0000648","title":"Enhancing Construction As-Built Documentation Using Interactive Voice Response","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Documentation; Interactive voice response; Computer science; Schedule; Scheduling (production processes); Multimedia; Service (business); Human–computer interaction; Engineering; Telecommunications; Operations management; Operating system","score_opus":0.00606252945336838,"score_gpt":0.23629850217153672,"score_spread":0.23023597271816834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135572933","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15242063,0.00038796855,0.8045968,0.0003015565,0.00012578347,0.00045302245,0.0001855845,0.018134179,0.02339448],"genre_scores_gemma":[0.54940695,0.00039422075,0.4369899,0.00013261233,0.00009345636,0.0003208691,0.00030637727,0.000745922,0.0116096875],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9963062,0.0018813227,0.0001697669,0.00032574162,0.0010603665,0.00025670443],"domain_scores_gemma":[0.99431384,0.0033431163,0.00046093354,0.0007553162,0.0009692489,0.00015754704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026310019,0.00077017717,0.0004453912,0.0015386166,0.00029395855,0.0013091667,0.00096551614,0.0006719979,0.005290292],"category_scores_gemma":[0.0061260234,0.0002640384,0.0003726649,0.0007706371,0.00030458425,0.0013354962,0.0014275842,0.00045225723,0.0018586931],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005319038,0.0007171063,0.0036907115,0.0007827552,0.000036735324,0.00050657324,0.0043747937,0.012475536,0.099020146,0.003728089,0.0056209527,0.86851466],"study_design_scores_gemma":[0.00051071384,0.0034420479,0.024903333,0.0008708265,0.00033646784,0.0030946098,0.005703936,0.26534754,0.41277725,0.008261159,0.27419287,0.0005591891],"about_ca_topic_score_codex":0.0005345283,"about_ca_topic_score_gemma":0.0007966327,"teacher_disagreement_score":0.005290292,"about_ca_system_score_codex":0.00028006008,"about_ca_system_score_gemma":0.0006447512,"threshold_uncertainty_score":0.017697811},"labels":[],"label_agreement":null},{"id":"W2139581178","doi":"10.1061/(asce)0733-9364(2003)129:5(518)","title":"Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":152,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; Microsoft Research","keywords":"Schedule; Duration (music); Computer science; Operations research; Risk analysis (engineering); Engineering","score_opus":0.059510544715074366,"score_gpt":0.3324887915624477,"score_spread":0.2729782468473733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2139581178","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11166115,0.0001948366,0.8673159,0.00052194233,0.000028651706,0.0003423323,0.00035629465,0.00022389143,0.019355038],"genre_scores_gemma":[0.8412453,0.0002811871,0.15074448,0.000046450612,0.000023380035,0.0006298169,0.0003213975,0.00004919628,0.0066587646],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981002,0.00090250187,0.00008240708,0.0002254276,0.0005309635,0.00015834138],"domain_scores_gemma":[0.9957152,0.0028368528,0.00049711124,0.00017172578,0.00067580113,0.00010330137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034278869,0.00087366527,0.00064848445,0.0017460131,0.00056053174,0.001673608,0.0017827742,0.0011889951,0.0037857292],"category_scores_gemma":[0.010232111,0.00054780813,0.0009868428,0.0014002528,0.0006947738,0.001955306,0.0013175494,0.0011739894,0.0004084239],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006260023,0.000061019484,0.0034097256,0.00005306462,0.0000520676,0.00009882965,0.00021321488,0.9391326,0.00047169856,0.039021272,0.0005733598,0.01685061],"study_design_scores_gemma":[0.00001278963,0.000054806776,0.00084820203,0.000016403177,0.000030898365,0.00005033095,0.000059423925,0.98021543,0.00025048485,0.01736629,0.0010779576,0.00001698233],"about_ca_topic_score_codex":0.012949488,"about_ca_topic_score_gemma":0.008179322,"teacher_disagreement_score":0.012949488,"about_ca_system_score_codex":0.0021911447,"about_ca_system_score_gemma":0.0022528716,"threshold_uncertainty_score":0.025748253},"labels":[],"label_agreement":null},{"id":"W2141122753","doi":"10.1061/(asce)0733-9364(2004)130:5(638)","title":"Planning and Scheduling Highway Construction","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Unavailability; Scheduling (production processes); Computer science; Software; Project planning; Operations research; Transport engineering; Software engineering; Systems engineering; Industrial engineering; Project management; Engineering; Operations management; Operating system; Reliability engineering","score_opus":0.004811195081526139,"score_gpt":0.18399221063971358,"score_spread":0.17918101555818744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141122753","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07603765,0.00025435738,0.88492185,0.00040753317,0.000073752126,0.00042817733,0.0018460096,0.0013078949,0.034722827],"genre_scores_gemma":[0.56442213,0.0009086438,0.41511688,0.000051294064,0.000025649832,0.0007534575,0.0024420533,0.0003258862,0.015953958],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996345,0.000096735545,0.000021645468,0.00007814318,0.000114571594,0.000054411354],"domain_scores_gemma":[0.9997831,0.00007884113,0.000031620184,0.000031055115,0.00004389023,0.000031626518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052068697,0.00050076836,0.00046626703,0.00049788883,0.00054914254,0.0015266888,0.0011330831,0.0006590403,0.005557939],"category_scores_gemma":[0.0007980095,0.00049421395,0.00056695513,0.0007284234,0.00045173182,0.00094126665,0.00058320124,0.00051897083,0.0007606119],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036259462,0.00003471831,0.0007567098,0.00004400985,0.000008010448,0.000048955477,0.00007182798,0.9639121,0.0007376989,0.01865865,0.0008444087,0.014846698],"study_design_scores_gemma":[0.000023778555,0.00003941486,0.0004490096,0.000018411813,0.000012271149,0.000030301284,0.00008554254,0.97185016,0.001017835,0.012210737,0.014246591,0.000015994905],"about_ca_topic_score_codex":0.023759812,"about_ca_topic_score_gemma":0.020658841,"teacher_disagreement_score":0.023759812,"about_ca_system_score_codex":0.0014827308,"about_ca_system_score_gemma":0.0031276986,"threshold_uncertainty_score":0.04724306},"labels":[],"label_agreement":null},{"id":"W2141739264","doi":"10.1061/(asce)0733-9364(2008)134:4(253)","title":"Efficient Repetitive Scheduling for High-Rise Construction","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Operations research; Industrial engineering; Distributed computing; Mathematical optimization; Real-time computing; Engineering","score_opus":0.028696489337741597,"score_gpt":0.28016341916258974,"score_spread":0.25146692982484814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141739264","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04028121,0.00014669848,0.9532245,0.00018515073,0.000023642833,0.0000806492,0.00011159646,0.0002274415,0.0057190624],"genre_scores_gemma":[0.81193596,0.0003865779,0.17751831,0.00004669439,0.00002820328,0.00026877224,0.00030694474,0.00012131012,0.009387168],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907625,0.00034609908,0.000027209744,0.00014197268,0.00026174806,0.00014671846],"domain_scores_gemma":[0.99938154,0.00031966844,0.00012307861,0.000049359576,0.000076051554,0.000050329796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011238647,0.0006682233,0.0010895104,0.0005131752,0.0005219357,0.0011011967,0.0015411951,0.0011164721,0.0034259325],"category_scores_gemma":[0.0019083149,0.00059624756,0.00075841375,0.0009417587,0.0006513039,0.0011764118,0.0007987573,0.0010992504,0.0003752636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010917009,0.000012730053,0.00006569241,0.000010844631,0.0000033231552,0.000016172049,0.0000129765385,0.99330914,0.00020565103,0.0037164567,0.0001237389,0.00251239],"study_design_scores_gemma":[0.000004546857,0.00001272855,0.000047019414,0.000001343947,0.0000020656958,0.0000056669014,0.0000071453765,0.99742055,0.0000888405,0.0021646502,0.00024319593,0.0000022487268],"about_ca_topic_score_codex":0.015068785,"about_ca_topic_score_gemma":0.013956136,"teacher_disagreement_score":0.015068785,"about_ca_system_score_codex":0.0019853069,"about_ca_system_score_gemma":0.0023238554,"threshold_uncertainty_score":0.029962182},"labels":[],"label_agreement":null},{"id":"W2144560128","doi":"10.1061/(asce)co.1943-7862.0000974","title":"Hardhat-Wearing Detection for Enhancing On-Site Safety of Construction Workers","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":221,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Matching (statistics); Construction site safety; Recall; Work (physics); Safety monitoring; Computer science; Occupational safety and health; Precision and recall; Computer security; Risk analysis (engineering); Engineering; Business; Artificial intelligence; Medicine; Psychology","score_opus":0.036996823084251444,"score_gpt":0.3618167803672243,"score_spread":0.32481995728297286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144560128","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62259406,0.0018765394,0.36256498,0.00021041311,0.0003061281,0.0002497619,0.0007626115,0.0026222698,0.008813236],"genre_scores_gemma":[0.87730867,0.0010634823,0.11645376,0.00012535419,0.000081754646,0.000079321435,0.0007144943,0.000089402,0.004083618],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996598,0.000043352782,0.000013160738,0.00009858531,0.000120138204,0.00006506906],"domain_scores_gemma":[0.9995529,0.000077629215,0.000085140215,0.000043301046,0.00019559637,0.000045309658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002868866,0.0005897279,0.00041818412,0.0017779801,0.00025312885,0.00035972171,0.0005839262,0.0006655827,0.0013964887],"category_scores_gemma":[0.00089529523,0.00025323796,0.0003935176,0.0005580069,0.00017900595,0.00055136206,0.00074384536,0.00036509056,0.0007821513],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069754856,0.0003200847,0.048242267,0.00058072753,0.00009640313,0.0005509994,0.00046070226,0.0044746343,0.16101408,0.00055424875,0.007157046,0.7758513],"study_design_scores_gemma":[0.00011350992,0.001152082,0.32816777,0.00025786212,0.0004064598,0.0036868735,0.0016684362,0.43800607,0.2054023,0.0019165574,0.01905553,0.00016668404],"about_ca_topic_score_codex":0.0026562538,"about_ca_topic_score_gemma":0.0056846426,"teacher_disagreement_score":0.0026562538,"about_ca_system_score_codex":0.0001811766,"about_ca_system_score_gemma":0.0003525559,"threshold_uncertainty_score":0.005281627},"labels":[],"label_agreement":null},{"id":"W2152933467","doi":"10.1061/(asce)0733-9364(2005)131:3(360)","title":"Quantifying Engineering Project Scope for Productivity Modeling","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scope (computer science); Rework; Work breakdown structure; Productivity; Computer science; Statement of work; Project management; Systems engineering; Estimation; Engineering management; Project planning; Engineering; Risk analysis (engineering); Management science; Project charter; Business","score_opus":0.018504629679681514,"score_gpt":0.22978327418486275,"score_spread":0.21127864450518125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152933467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07387789,0.00023793323,0.91678107,0.0001549759,0.000030821506,0.00019405957,0.0007622051,0.0003672527,0.0075938925],"genre_scores_gemma":[0.61470777,0.00030364067,0.3818389,0.0000348109,0.000018715155,0.00067018706,0.0013306701,0.00011097445,0.00098435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9929242,0.0034219194,0.0005478359,0.00061081134,0.0022823121,0.00021294202],"domain_scores_gemma":[0.9836399,0.009842989,0.0015751313,0.0025697243,0.0021855233,0.00018671114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071166866,0.0008949238,0.0006004279,0.0054085106,0.0005802543,0.002514246,0.0009791221,0.0006471071,0.0021359895],"category_scores_gemma":[0.03617884,0.0004290303,0.0009351292,0.0045686327,0.0008999745,0.0038123582,0.002148065,0.00076925004,0.00039957062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015069105,0.0002529062,0.070883505,0.0005679552,0.00010621192,0.00012516863,0.0017610522,0.46312234,0.006920536,0.08812224,0.002481416,0.36550602],"study_design_scores_gemma":[0.000037185564,0.0003307282,0.04594696,0.00028772058,0.000040593583,0.00022449518,0.0012871668,0.8491447,0.0090040155,0.0729434,0.020596681,0.00015635714],"about_ca_topic_score_codex":0.0028473025,"about_ca_topic_score_gemma":0.0033052596,"teacher_disagreement_score":0.0071166866,"about_ca_system_score_codex":0.001757741,"about_ca_system_score_gemma":0.0015324216,"threshold_uncertainty_score":0.037637115},"labels":[],"label_agreement":null},{"id":"W2155750016","doi":"10.1061/(asce)0733-9364(2000)126:3(219)","title":"Simplified CPM/PERT Simulation Model","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":99,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Critical path method; Computer science; Complement (music); Criticality; Schedule; Project management; Reliability engineering; Operations research; Systems engineering; Engineering","score_opus":0.04317147818980395,"score_gpt":0.320221638407086,"score_spread":0.27705016021728207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2155750016","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022906473,0.0001641501,0.94231135,0.0003758218,0.00007070513,0.00019324609,0.00057189853,0.0008308887,0.032575548],"genre_scores_gemma":[0.7997772,0.0006031035,0.17029582,0.0001793437,0.00010419964,0.000966154,0.00094142585,0.00017370241,0.026959097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987369,0.0004867503,0.00006451257,0.00015125312,0.0004436022,0.0001169661],"domain_scores_gemma":[0.99865216,0.0005355612,0.00017888228,0.00014350256,0.00042327767,0.00006657736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010381577,0.0005910627,0.00061823655,0.0009773509,0.00046194304,0.0013256706,0.0015782011,0.0011212971,0.0073282085],"category_scores_gemma":[0.0034422644,0.00035299227,0.00081109966,0.0009312539,0.0005796482,0.0014243502,0.0010998427,0.0009524176,0.001053499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045360095,0.000029544788,0.00050242885,0.000058055743,0.00001531266,0.00018370348,0.000060872302,0.9069023,0.0011555968,0.07718441,0.0010795838,0.01278281],"study_design_scores_gemma":[0.000009988402,0.000024832116,0.00013993097,0.0000074273803,0.000008021069,0.00006472382,0.000011802663,0.9844268,0.00031185045,0.011248377,0.0037379982,0.0000083525],"about_ca_topic_score_codex":0.007754899,"about_ca_topic_score_gemma":0.0034468507,"teacher_disagreement_score":0.007754899,"about_ca_system_score_codex":0.0011640897,"about_ca_system_score_gemma":0.0016990887,"threshold_uncertainty_score":0.02451533},"labels":[],"label_agreement":null},{"id":"W2160721836","doi":"10.1061/(asce)0733-9364(2005)131:10(1099)","title":"Application of the Theory of Inventive Problem Solving in Tunnel Construction","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Engineering and Environmental Studies","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Tunnel construction; Computer science; Engineering; Calculus (dental); Mathematics; Engineering drawing; Structural engineering","score_opus":0.002897945461531467,"score_gpt":0.15344080487903788,"score_spread":0.15054285941750642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2160721836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0123060625,0.0016528409,0.92417824,0.0030297344,0.00014461948,0.00029524326,0.00004214808,0.00017109969,0.058179893],"genre_scores_gemma":[0.2509789,0.0027202915,0.739103,0.0003950234,0.000101945916,0.00084558787,0.00007077012,0.000058060006,0.005726463],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9940532,0.0036577224,0.00038632457,0.00039396837,0.0013021133,0.00020677694],"domain_scores_gemma":[0.9903038,0.0078051356,0.0005013534,0.00061406696,0.00060775905,0.00016793853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064657256,0.00096031715,0.0007699042,0.0045975875,0.001557984,0.004185317,0.0016860907,0.0017308953,0.0044886],"category_scores_gemma":[0.013774064,0.0004624347,0.0018688838,0.0026719614,0.010683849,0.0050561517,0.0040654414,0.0030227522,0.0005973274],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012995155,0.00005915073,0.0005989967,0.0002655889,0.000028236022,0.00010840657,0.0018181853,0.019909494,0.00022431537,0.923878,0.0009831385,0.05211359],"study_design_scores_gemma":[0.000026512218,0.000055904136,0.0002863557,0.00028088296,0.000013773075,0.00015085656,0.0011664925,0.05585538,0.00061088224,0.91609335,0.025428554,0.000031132317],"about_ca_topic_score_codex":0.002056338,"about_ca_topic_score_gemma":0.0017149436,"teacher_disagreement_score":0.0064657256,"about_ca_system_score_codex":0.0035511858,"about_ca_system_score_gemma":0.0046367836,"threshold_uncertainty_score":0.03419441},"labels":[],"label_agreement":null},{"id":"W2168852977","doi":"10.1061/(asce)0733-9364(2002)128:5(438)","title":"Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Alberta","keywords":"Artificial neural network; Computer science; Beta distribution; Probability distribution; Merge (version control); Sampling (signal processing); Artificial intelligence; Data mining; Statistics; Machine learning; Mathematics","score_opus":0.026660590404711422,"score_gpt":0.2570156965044356,"score_spread":0.2303551060997242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168852977","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13072056,0.00005341399,0.8631389,0.00016446158,0.000020794978,0.0001949191,0.00011131031,0.00063247996,0.004963157],"genre_scores_gemma":[0.8175995,0.0001107075,0.18056189,0.000037321497,0.000013627747,0.0003756252,0.00014532839,0.000046766974,0.0011092204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99684227,0.0019353197,0.00017850156,0.000217053,0.00072046596,0.00010641822],"domain_scores_gemma":[0.9915418,0.0052609956,0.00081414095,0.00053979945,0.0017602821,0.000083057785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040434105,0.0005598409,0.0005147829,0.0007419933,0.00029335494,0.001044465,0.00088454265,0.00047347954,0.0009920227],"category_scores_gemma":[0.017258784,0.0002871129,0.00037536523,0.00079446007,0.00028707896,0.0011294967,0.0005697097,0.0005008989,0.00017874567],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008929667,0.00009172149,0.004796565,0.00007814053,0.000032947795,0.000055818855,0.00015442123,0.9418415,0.0013646119,0.0035658546,0.00026823144,0.047660887],"study_design_scores_gemma":[0.000006862431,0.000034186698,0.0005579045,0.000007727693,0.0000068881654,0.000010574115,0.000014929522,0.9968125,0.0012112985,0.0010220458,0.00030853797,0.00000648811],"about_ca_topic_score_codex":0.0043372926,"about_ca_topic_score_gemma":0.0048050713,"teacher_disagreement_score":0.0043372926,"about_ca_system_score_codex":0.0012236516,"about_ca_system_score_gemma":0.001121113,"threshold_uncertainty_score":0.021383882},"labels":[],"label_agreement":null},{"id":"W2170231646","doi":"10.1061/(asce)0733-9364(2007)133:2(169)","title":"Decision Making in Flexible Mine Production System Design Using Real Options","year":2007,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Capital Investment and Risk Analysis","field":"Economics, Econometrics and Finance","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Laurentian University","funders":"","keywords":"Flexibility (engineering); Risk analysis (engineering); Profitability index; Schedule; Production (economics); Engineering; Computer science; Business","score_opus":0.02623529148179403,"score_gpt":0.23135664679461992,"score_spread":0.20512135531282588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2170231646","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052427057,0.0005475378,0.93622774,0.00059443736,0.000039537783,0.00018542964,0.000059889877,0.00007957444,0.0098387115],"genre_scores_gemma":[0.8137727,0.00053477305,0.18220568,0.00008439813,0.000025458006,0.00039905633,0.00005917301,0.000036838053,0.0028820366],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962591,0.0027252845,0.00011877908,0.000251908,0.00044242063,0.00020261288],"domain_scores_gemma":[0.99455714,0.0045837155,0.00034481494,0.00012960735,0.0002487008,0.00013604487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058812504,0.0013942855,0.0010004686,0.00095216313,0.00088167173,0.0034306487,0.001062894,0.0017285938,0.003407747],"category_scores_gemma":[0.008797385,0.0009992365,0.0011827158,0.00090987224,0.0019962976,0.0024790247,0.00207818,0.0017985823,0.00021057866],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041893556,0.000021597576,0.00024235577,0.000046210273,0.000021503016,0.00009845367,0.00011112047,0.9685597,0.0003347731,0.023763817,0.000095836695,0.0066628237],"study_design_scores_gemma":[0.000028494209,0.000071863666,0.000099371326,0.000031917694,0.000013307964,0.00002526839,0.00010139775,0.96960604,0.00029490492,0.028723057,0.0009861611,0.000018097277],"about_ca_topic_score_codex":0.0027986849,"about_ca_topic_score_gemma":0.0028394407,"teacher_disagreement_score":0.0058812504,"about_ca_system_score_codex":0.0017385365,"about_ca_system_score_gemma":0.00202931,"threshold_uncertainty_score":0.031103373},"labels":[],"label_agreement":null},{"id":"W2225307076","doi":"10.1061/(asce)co.1943-7862.0001087","title":"Strategies to Reduce Ground Settlement from Shallow Tunnel Excavation: A Case Study in China","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Geotechnical Engineering and Analysis","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Natural Resources","funders":"National Natural Science Foundation of China","keywords":"Settlement (finance); Excavation; Range (aeronautics); Geotechnical engineering; Civil engineering; Engineering; Computer science","score_opus":0.006679215675915229,"score_gpt":0.21048684516353777,"score_spread":0.20380762948762254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2225307076","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99442106,0.000025421376,0.0042362497,0.000039930477,0.0000022375473,0.000047679085,0.000026206282,0.000018602614,0.0011825974],"genre_scores_gemma":[0.9972301,0.00003497076,0.0022209592,0.000005518622,7.038954e-7,0.000019314823,0.00001960653,0.0000025602567,0.00046625634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99944764,0.00019116592,0.000026914237,0.000054140586,0.00010344641,0.00017671495],"domain_scores_gemma":[0.9991923,0.00039958156,0.0001203262,0.00007242118,0.00010428371,0.00011108218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011052728,0.0006306827,0.0006039986,0.0006689892,0.0009141698,0.0006338288,0.0012455205,0.0011053318,0.0008234509],"category_scores_gemma":[0.0014179609,0.00031961375,0.0007572403,0.00066583016,0.00092028297,0.0006401056,0.00089642074,0.00033959726,0.000054652723],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017752447,0.0002998019,0.032772757,0.0000940852,0.00005662244,0.00349123,0.00048010892,0.94309896,0.0037586791,0.0020585887,0.00022824526,0.013483454],"study_design_scores_gemma":[0.00013281385,0.00089072314,0.022787647,0.000024940373,0.00007783649,0.0003337236,0.0021811076,0.9650746,0.0057579735,0.0017101933,0.00097421574,0.0000543349],"about_ca_topic_score_codex":0.059327092,"about_ca_topic_score_gemma":0.08372268,"teacher_disagreement_score":0.059327092,"about_ca_system_score_codex":0.002348328,"about_ca_system_score_gemma":0.002981176,"threshold_uncertainty_score":0.11796355},"labels":[],"label_agreement":null},{"id":"W2274886797","doi":"10.1061/(asce)co.1943-7862.0001064","title":"In Memoriam: Edward F. Reese, P.E. Founding Member of the Construction Institute","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brantford Energy (Canada)","funders":"","keywords":"Art; Theology; Philosophy","score_opus":0.06253674921359659,"score_gpt":0.31723746766532995,"score_spread":0.25470071845173337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2274886797","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00029015442,0.006472653,0.0006961565,0.43852672,0.5480387,0.000051178195,0.00038173885,0.000212517,0.005330249],"genre_scores_gemma":[0.008817772,0.011120959,0.0018108517,0.29263464,0.46102357,0.00020527473,0.0006468738,0.0003311117,0.22340895],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979048,0.0002649504,0.00018819302,0.00035874595,0.001123207,0.00016010409],"domain_scores_gemma":[0.97680366,0.002712602,0.0011655145,0.0005391585,0.015747702,0.0030314913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038553763,0.0014503635,0.0016778184,0.0010483954,0.002996737,0.005754572,0.0023688222,0.004303264,0.021805763],"category_scores_gemma":[0.025601277,0.0005399642,0.0009419831,0.000688504,0.001635958,0.0034224943,0.0025675308,0.014918986,0.024154874],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007774746,0.0000030309143,0.000039298782,0.000016667549,0.0000019599347,0.000038619106,0.00002124453,0.0000103734055,0.00001963288,0.00013361925,0.9970516,0.002656068],"study_design_scores_gemma":[0.000008177775,0.000014534649,0.00032825183,0.000105602805,0.000008315981,0.00023576939,0.00021752992,0.000070410664,0.00008864452,0.000505226,0.99840397,0.000013555434],"about_ca_topic_score_codex":0.007243674,"about_ca_topic_score_gemma":0.013533531,"teacher_disagreement_score":0.021805763,"about_ca_system_score_codex":0.0026620468,"about_ca_system_score_gemma":0.005159829,"threshold_uncertainty_score":0.07294756},"labels":[],"label_agreement":null},{"id":"W2412833024","doi":"10.1061/(asce)co.1943-7862.0001193","title":"Flexible Activity Relations to Support Optimum Schedule Acceleration","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Flexibility (engineering); Computer science; Representation (politics); Relation (database); Resource (disambiguation); Operations research; Range (aeronautics); Process (computing); Logical framework; Industrial engineering; Mathematical optimization; Engineering; Mathematics; Data mining","score_opus":0.05089605280751104,"score_gpt":0.325454514715168,"score_spread":0.274558461907657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2412833024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033716742,0.000078796984,0.9588016,0.000116305,0.00002082805,0.00010329298,0.00010025965,0.00029114416,0.0067710225],"genre_scores_gemma":[0.62343484,0.0002032043,0.37126195,0.000042122803,0.000023270963,0.00025508282,0.00021919374,0.00013545557,0.004424876],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841,0.00058190455,0.000108307344,0.00023468237,0.00045746882,0.00020758182],"domain_scores_gemma":[0.998505,0.0007116242,0.00028947688,0.00022427141,0.00016318036,0.000106420106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015960352,0.0006833399,0.00053061853,0.00067772303,0.0005043518,0.001851439,0.0015572557,0.0005911858,0.0057244385],"category_scores_gemma":[0.0044376315,0.00048699637,0.0008206454,0.0011391453,0.0010215738,0.0027153213,0.0013961795,0.0015896434,0.00065491005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014167457,0.00008998533,0.0011207318,0.000119065546,0.00001784632,0.00013420517,0.00028425016,0.70504194,0.006321081,0.24812953,0.0010019036,0.03759775],"study_design_scores_gemma":[0.000036202386,0.00017386298,0.0005090471,0.000029353454,0.000026667482,0.00008607563,0.0001609223,0.90261155,0.0041666967,0.08304807,0.009123906,0.000027641872],"about_ca_topic_score_codex":0.0028331776,"about_ca_topic_score_gemma":0.0044040857,"teacher_disagreement_score":0.0057244385,"about_ca_system_score_codex":0.0010394957,"about_ca_system_score_gemma":0.0017203351,"threshold_uncertainty_score":0.019150138},"labels":[],"label_agreement":null},{"id":"W2443310345","doi":"10.1061/(asce)co.1943-7862.0001191","title":"Fuzzy Arithmetic Risk Analysis Approach to Determine Construction Project Contingency","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Fuzzy logic; Defuzzification; Fuzzy number; Computer science; Contingency table; Contingency; Fuzzy set; Probabilistic logic; Data mining; Machine learning; Artificial intelligence","score_opus":0.030389552289083615,"score_gpt":0.28156189995364383,"score_spread":0.2511723476645602,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2443310345","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046623866,0.00011005844,0.99191624,0.000050999795,0.00001797297,0.00004286896,0.000030239962,0.000089988185,0.0030792032],"genre_scores_gemma":[0.33097544,0.00040439275,0.66493684,0.000057339334,0.000055604185,0.00022550355,0.00013493745,0.00005613861,0.0031538187],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99772376,0.0006907659,0.00012613056,0.0002632033,0.0010921642,0.000104040904],"domain_scores_gemma":[0.99846613,0.00081876427,0.00019161707,0.00010061549,0.00038667241,0.000036201065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024725278,0.0011437769,0.0006751775,0.0030017435,0.00071666593,0.0018398244,0.0011805778,0.0006799741,0.0037812178],"category_scores_gemma":[0.004721924,0.00039501596,0.0013084711,0.001408963,0.0009531838,0.0018184683,0.0010599135,0.0017471621,0.00042004694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008544251,0.000059771824,0.0015637489,0.00021845158,0.00013009828,0.00015889827,0.00038434338,0.6857255,0.005314865,0.15956995,0.0018070431,0.14498182],"study_design_scores_gemma":[0.00001136776,0.0000790817,0.0006965477,0.0000441569,0.000030134855,0.000110214845,0.00009355409,0.93995273,0.0024765548,0.052084144,0.004372432,0.000049221697],"about_ca_topic_score_codex":0.0031116977,"about_ca_topic_score_gemma":0.003078756,"teacher_disagreement_score":0.0037812178,"about_ca_system_score_codex":0.0013808932,"about_ca_system_score_gemma":0.0019354518,"threshold_uncertainty_score":0.013076186},"labels":[],"label_agreement":null},{"id":"W2485420449","doi":"10.1061/(asce)co.1943-7862.0001214","title":"Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Work breakdown structure; Computer science; Flow network; Network planning and design; Industrial engineering; Operations research; Reliability engineering; Engineering; Systems engineering; Project management; Project planning; Mathematical optimization","score_opus":0.013858113457767695,"score_gpt":0.2069908226303679,"score_spread":0.1931327091726002,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2485420449","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010279611,0.000049162933,0.98728,0.000055685265,0.000008737031,0.00007908466,0.000126155,0.0002726942,0.0018488015],"genre_scores_gemma":[0.42854565,0.00025913102,0.5667556,0.000055220185,0.000020026242,0.0007027774,0.000711855,0.00016541261,0.0027843844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965763,0.00010156196,0.000016166226,0.000073643365,0.00010594233,0.000044964338],"domain_scores_gemma":[0.99953127,0.00023993722,0.00007566747,0.00003329529,0.000095097,0.000024795872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069530436,0.000987146,0.00072961283,0.0012223102,0.00045408795,0.0009907925,0.0010717334,0.00072944356,0.002879495],"category_scores_gemma":[0.0014960663,0.0006653947,0.0008914134,0.0009887632,0.00043264986,0.0012407121,0.0008553035,0.0007385422,0.00036911215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000670483,0.000012553155,0.0001963848,0.000018832661,0.0000046184973,0.000014312425,0.00001306961,0.98950523,0.00029049267,0.0017363116,0.00014408283,0.008057419],"study_design_scores_gemma":[0.0000016565765,0.0000040709224,0.000034411216,0.0000020605498,0.0000013768134,0.0000030370672,0.000005036419,0.9988803,0.000121998346,0.00078966655,0.000155015,0.0000013754511],"about_ca_topic_score_codex":0.0128180105,"about_ca_topic_score_gemma":0.013597593,"teacher_disagreement_score":0.0128180105,"about_ca_system_score_codex":0.0014486422,"about_ca_system_score_gemma":0.002224006,"threshold_uncertainty_score":0.025486827},"labels":[],"label_agreement":null},{"id":"W2491560895","doi":"10.1061/(asce)co.1943-7862.0001213","title":"Genetic Algorithm–Simulation Framework for Decision Making in Construction Site Layout Planning","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Natural Resources","funders":"","keywords":"Closeness; Genetic algorithm; Heuristic; Computer science; Function (biology); Mathematical optimization; Industrial engineering; Algorithm; Machine learning; Engineering; Artificial intelligence; Mathematics","score_opus":0.006844433011699463,"score_gpt":0.23554017794394233,"score_spread":0.22869574493224287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2491560895","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040753633,0.0002204159,0.9895834,0.00023558126,0.000032816683,0.00006786553,0.000057875,0.00016981977,0.0055568507],"genre_scores_gemma":[0.31167284,0.0008930417,0.6816213,0.00016557875,0.00006149776,0.000827925,0.00025920212,0.00012044238,0.004378119],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988374,0.000721215,0.000039959603,0.00010967068,0.00021813864,0.00007357017],"domain_scores_gemma":[0.99861145,0.0010021202,0.00008824899,0.000048995105,0.0001957785,0.00005335677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019728455,0.0013242131,0.0013513718,0.0013892892,0.00081251876,0.0016759193,0.002425461,0.0019038954,0.0033336545],"category_scores_gemma":[0.0036941462,0.00067883584,0.0012830183,0.0016643949,0.0014879325,0.001254024,0.00113653,0.0015884361,0.0004481748],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052453856,0.000007826253,0.000094884745,0.00001372581,0.000012763056,0.000019868088,0.000015455793,0.98073065,0.00007693886,0.016444873,0.00012350756,0.0024543095],"study_design_scores_gemma":[0.000006678141,0.0000068314507,0.000020753352,0.0000068941035,0.000003909795,0.0000056662047,0.000006216264,0.99129945,0.000046877267,0.008029738,0.0005631351,0.00000383827],"about_ca_topic_score_codex":0.023300858,"about_ca_topic_score_gemma":0.014018693,"teacher_disagreement_score":0.023300858,"about_ca_system_score_codex":0.0023668716,"about_ca_system_score_gemma":0.0034367286,"threshold_uncertainty_score":0.046330452},"labels":[],"label_agreement":null},{"id":"W2558964015","doi":"10.1061/(asce)co.1943-7862.0001276","title":"Uncertainty-Aware Linear Schedule Optimization: A Space-Time Constraint-Satisfaction Approach","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Schedule; Duration (music); Computer science; Mathematical optimization; Workspace; Scheduling (production processes); Constraint satisfaction; Linear programming; Operations research; Industrial engineering; Engineering; Mathematics; Robot; Algorithm; Artificial intelligence","score_opus":0.022462676244273835,"score_gpt":0.26897624360049965,"score_spread":0.24651356735622582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2558964015","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005454327,0.00013123847,0.9920214,0.00010530061,0.000018036524,0.00004691579,0.000056887613,0.000086702144,0.0020792198],"genre_scores_gemma":[0.5350398,0.00054263126,0.46018863,0.00013629154,0.00009231397,0.00043154953,0.00034849925,0.00012178497,0.0030986106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882334,0.00047932722,0.00005112165,0.00015409543,0.00035397816,0.00013813961],"domain_scores_gemma":[0.99832755,0.0011372175,0.00015056219,0.000050877556,0.00027249748,0.00006121398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016966027,0.001110349,0.0012949075,0.0011320076,0.0005751331,0.0013611161,0.0015516749,0.0010275592,0.0028178617],"category_scores_gemma":[0.002932172,0.000756749,0.0014132148,0.0016465192,0.00074665237,0.0010473172,0.0011533765,0.0012840098,0.00028491725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016849335,0.000016425747,0.00010398751,0.000036321126,0.000017737413,0.000034844612,0.000030581283,0.9861712,0.00032211724,0.0051180986,0.00024561118,0.007886201],"study_design_scores_gemma":[0.0000034688546,0.000012440395,0.000024834528,0.000003156606,0.00000397335,0.0000041050325,0.00000806163,0.9976774,0.00011078184,0.0019463178,0.00020260568,0.0000028527327],"about_ca_topic_score_codex":0.015380064,"about_ca_topic_score_gemma":0.009998941,"teacher_disagreement_score":0.015380064,"about_ca_system_score_codex":0.0013046762,"about_ca_system_score_gemma":0.0023291926,"threshold_uncertainty_score":0.030581057},"labels":[],"label_agreement":null},{"id":"W2641878396","doi":"10.1061/(asce)co.1943-7862.0001364","title":"The University of Alberta’s Hole School of Construction Engineering: 25 Years of Impact and Innovation","year":2017,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Speculation; Relevance (law); Audience measurement; Editorial board; Engineering; Political science; Engineering ethics; Library science; Media studies; Sociology; Management; Law; Economics; Computer science","score_opus":0.004403314453956561,"score_gpt":0.18529836120196835,"score_spread":0.1808950467480118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2641878396","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06292492,0.31231007,0.0038965677,0.2838021,0.01514955,0.00013161004,0.00083692704,0.00042503854,0.3205233],"genre_scores_gemma":[0.5259373,0.19390006,0.0051024854,0.010591377,0.0046949494,0.00009467493,0.0008602565,0.00030724946,0.2585115],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9915063,0.0008324493,0.00016242928,0.00036919778,0.005478244,0.0016513366],"domain_scores_gemma":[0.9799216,0.003210103,0.000637147,0.0009896798,0.0052942405,0.009947351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0156129785,0.0007995394,0.0009003346,0.0061727203,0.008352105,0.025678938,0.0016832559,0.0038225858,0.016650995],"category_scores_gemma":[0.012472497,0.00055743865,0.0004395062,0.01103358,0.012503863,0.006921777,0.008370216,0.004036919,0.0027188524],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020892678,0.00027179124,0.008442811,0.00059922406,0.000031612628,0.00035480835,0.013096698,0.0006869991,0.00089792244,0.17127658,0.26905197,0.5350807],"study_design_scores_gemma":[0.000012285235,0.00006610347,0.018069115,0.00089674664,0.000015122515,0.000061724255,0.009340399,0.0001818932,0.0004866768,0.014575847,0.9562485,0.00004552624],"about_ca_topic_score_codex":0.21946399,"about_ca_topic_score_gemma":0.44704938,"teacher_disagreement_score":0.9586084,"about_ca_system_score_codex":0.041391622,"about_ca_system_score_gemma":0.071052246,"threshold_uncertainty_score":0.43637317},"labels":[],"label_agreement":null},{"id":"W2773979636","doi":"10.1061/(asce)co.1943-7862.0001435","title":"Maintenance Cost Optimization for Bridge Structures Using System Reliability Analysis and Genetic Algorithms","year":2017,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Reliability (semiconductor); Schedule; Time horizon; Reliability engineering; Genetic algorithm; Optimal maintenance; Asset (computer security); Asset management; Engineering; Bridge maintenance; Computer science; Operations research; Mathematical optimization; Structural engineering; Business; Mathematics","score_opus":0.007440519031566896,"score_gpt":0.2223069129795192,"score_spread":0.21486639394795232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2773979636","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20040666,0.00032849165,0.7927817,0.0002572792,0.00001980259,0.00011613139,0.00010564933,0.0003678083,0.0056164893],"genre_scores_gemma":[0.89377236,0.00019203896,0.10402926,0.000036633697,0.000013841897,0.00020046953,0.0001339494,0.0000557225,0.0015656569],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996984,0.00012696901,0.0000104323935,0.000047399808,0.000077339144,0.0000394304],"domain_scores_gemma":[0.99908113,0.00068675913,0.00009771908,0.00002402193,0.00009269246,0.000017698934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009745836,0.00083002966,0.0007395955,0.0012179653,0.0003435218,0.00071702356,0.00079302717,0.00090313226,0.0011789921],"category_scores_gemma":[0.0026170213,0.0005009006,0.0007978589,0.00071844045,0.0005069009,0.00051864446,0.0004150878,0.0006610655,0.00011751151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027928793,0.0000060095877,0.00010926721,0.000003015638,0.0000035260516,0.0000036076667,0.0000030807373,0.9977076,0.00007802551,0.00038543335,0.000023707755,0.0016738143],"study_design_scores_gemma":[0.0000013736019,0.000005102801,0.0000431982,7.1931487e-7,0.000001686282,8.90629e-7,0.0000011676957,0.99963534,0.000039726463,0.00025241263,0.000017704564,7.5278376e-7],"about_ca_topic_score_codex":0.018849645,"about_ca_topic_score_gemma":0.013354564,"teacher_disagreement_score":0.018849645,"about_ca_system_score_codex":0.0018038806,"about_ca_system_score_gemma":0.0018746753,"threshold_uncertainty_score":0.037479877},"labels":[],"label_agreement":null},{"id":"W2799799531","doi":"10.1061/(asce)co.1943-7862.0001511","title":"Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics","year":2018,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Fiscal Policy and Economic Growth","field":"Economics, Econometrics and Finance","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Economics; Productivity; Inflation (cosmology); Relative price; Econometrics; Macroeconomics","score_opus":0.008366534821616882,"score_gpt":0.19281341734967025,"score_spread":0.18444688252805336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2799799531","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96947575,0.00050928193,0.022845384,0.0013027898,0.000019806754,0.000016309925,0.00048814772,0.00005585609,0.0052866465],"genre_scores_gemma":[0.9975504,0.00018561166,0.0014803405,0.00003724222,0.0000137876805,0.0000062922713,0.00020827723,0.000007951673,0.00050999684],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996915,0.000071750816,0.000026553576,0.00006577278,0.00008339632,0.00006106074],"domain_scores_gemma":[0.9982963,0.0006909587,0.00056435127,0.00020821106,0.00018467828,0.000055496606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009812695,0.00017150793,0.00034145598,0.0013122469,0.00030049944,0.0016981362,0.00029425745,0.0005385551,0.0010988755],"category_scores_gemma":[0.0044854623,0.00017041377,0.0004562135,0.0022274759,0.000530849,0.0021020724,0.0007016373,0.000819447,0.00013067121],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010798918,0.00012895766,0.6204132,0.000087973436,0.00028269592,0.0004884806,0.0019876207,0.20180026,0.001493877,0.09868506,0.0036716638,0.07085218],"study_design_scores_gemma":[0.00000782051,0.000063088184,0.336675,0.000042257565,0.00008497495,0.0002397207,0.0016751457,0.58068436,0.00094246224,0.072162814,0.0073496224,0.000072703304],"about_ca_topic_score_codex":0.018500198,"about_ca_topic_score_gemma":0.018432077,"teacher_disagreement_score":0.018500198,"about_ca_system_score_codex":0.0013659376,"about_ca_system_score_gemma":0.00080520805,"threshold_uncertainty_score":0.036785066},"labels":[],"label_agreement":null},{"id":"W2804288272","doi":"10.1061/(asce)co.1943-7862.0001513","title":"Measuring and Predicting Fatigue in Construction: Empirical Field Study","year":2018,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lockheed Martin (Canada)","funders":"","keywords":"Predictive validity; Predictive modelling; Field (mathematics); Set (abstract data type); Construction industry; Intervention (counseling); Engineering; Computer science; Psychology; Clinical psychology; Mathematics; Machine learning; Construction engineering; Psychiatry","score_opus":0.10279211560114238,"score_gpt":0.4297694035487382,"score_spread":0.32697728794759584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804288272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99914014,0.00003781289,0.0003514329,0.000019769288,0.000002312696,0.00010218666,0.000042094194,0.0000021918017,0.00030201182],"genre_scores_gemma":[0.99808323,0.00008429666,0.0012527311,0.000027707996,0.0000059459253,0.00012605598,0.00016160612,0.0000017546913,0.00025663234],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9963238,0.0023806554,0.00017416457,0.00044388548,0.00043671767,0.00024084983],"domain_scores_gemma":[0.9551124,0.035850037,0.002146775,0.0027362506,0.0031401245,0.0010144351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0108957365,0.0007432821,0.0005450334,0.0012177101,0.0011846833,0.00072926877,0.0011445894,0.0009238515,0.0016230211],"category_scores_gemma":[0.02370204,0.000667953,0.00062802545,0.0009748455,0.0015535842,0.00086914375,0.0006543822,0.0010475188,0.00048499883],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009942792,0.018497137,0.94242746,0.0001827274,0.00015308458,0.00021379975,0.004849144,0.004772627,0.00070558465,0.00036545534,0.0008081128,0.026030572],"study_design_scores_gemma":[0.0001924844,0.008809305,0.9690196,0.00011894638,0.00010266265,0.00019609857,0.0076499544,0.011126478,0.0006622128,0.00057669566,0.0014932391,0.000052203482],"about_ca_topic_score_codex":0.014138476,"about_ca_topic_score_gemma":0.01809895,"teacher_disagreement_score":0.014138476,"about_ca_system_score_codex":0.0014693841,"about_ca_system_score_gemma":0.001609115,"threshold_uncertainty_score":0.05762291},"labels":[],"label_agreement":null},{"id":"W2808239110","doi":"10.1061/(asce)co.1943-7862.0001534","title":"Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains","year":2018,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Rework; Computer science; Quality (philosophy); Reliability engineering; Markov chain; Cost estimate; Control (management); Decision support system; Systems engineering; Industrial engineering; Engineering; Data mining","score_opus":0.04038355625375099,"score_gpt":0.2943404203671337,"score_spread":0.2539568641133827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808239110","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031866007,0.00008145145,0.962948,0.00023039767,0.000029036924,0.00010172075,0.00037086234,0.00039154378,0.0039809337],"genre_scores_gemma":[0.9249833,0.0002769148,0.06850735,0.00007404941,0.000026426707,0.0006177729,0.00067660114,0.00007745354,0.0047601005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990212,0.00030468375,0.00006341461,0.00021032011,0.00025542564,0.00014496369],"domain_scores_gemma":[0.99751794,0.0015170159,0.0003144997,0.00013929087,0.00041212467,0.00009914233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018537854,0.00093829446,0.0011214761,0.00094960333,0.0005862883,0.001799591,0.0022773305,0.0015100216,0.003121452],"category_scores_gemma":[0.0041534835,0.00079405174,0.0011838812,0.0009464019,0.0009872952,0.001360873,0.0012568353,0.001607831,0.00039391304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010794724,0.0000072481957,0.00017872646,0.0000054218085,0.000004156525,0.0000127195,0.000009675341,0.9953141,0.00013751899,0.003664413,0.000042990137,0.00061222137],"study_design_scores_gemma":[0.0000028641105,0.0000030442682,0.000027767073,0.0000012654397,0.0000019036378,0.0000017907067,0.00000178531,0.9989378,0.00008577227,0.00085732236,0.000076729004,0.0000019166534],"about_ca_topic_score_codex":0.025392195,"about_ca_topic_score_gemma":0.012918082,"teacher_disagreement_score":0.025392195,"about_ca_system_score_codex":0.002191566,"about_ca_system_score_gemma":0.0025495673,"threshold_uncertainty_score":0.05048883},"labels":[],"label_agreement":null},{"id":"W2899586122","doi":"10.1061/(asce)co.1943-7862.0001580","title":"Worker Fatigue in Electrical-Transmission and Distribution-Line Construction","year":2018,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lockheed Martin (Canada)","funders":"","keywords":"Work (physics); Pace; Causation; Forensic engineering; Engineering; Mechanical engineering","score_opus":0.028690681313502768,"score_gpt":0.374121564945025,"score_spread":0.34543088363152225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2899586122","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99944323,0.00012599575,0.000085906475,0.000031491607,0.0000022354022,0.000005830864,0.000011564914,9.2024624e-7,0.00029288378],"genre_scores_gemma":[0.999542,0.00012870994,0.000076230855,0.000012847822,0.0000033258946,0.000006467078,0.000016236198,4.8800865e-7,0.00021377046],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99929726,0.00031797445,0.000047720263,0.00007621764,0.00016986331,0.00009087551],"domain_scores_gemma":[0.99844754,0.00061977596,0.00049665035,0.000053796688,0.00022848976,0.0001536381],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011897371,0.00015840994,0.00013776362,0.00050912256,0.00064998807,0.00034849512,0.00025756672,0.00048760697,0.0015292502],"category_scores_gemma":[0.003165738,0.00013786915,0.00017087196,0.00033895927,0.00043419856,0.00026298343,0.0006123564,0.00018576998,0.00017271511],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036650797,0.00025627995,0.9523187,0.0001545288,0.000022277489,0.00036684197,0.0150878625,0.0005063713,0.0029490776,0.000089857946,0.0003280228,0.027553704],"study_design_scores_gemma":[0.000004911346,0.00039239725,0.990815,0.000029420647,0.0000059378335,0.00019057753,0.0074918554,0.00022128853,0.00021931554,0.000057951616,0.00056448946,0.000006906847],"about_ca_topic_score_codex":0.007092646,"about_ca_topic_score_gemma":0.011631108,"teacher_disagreement_score":0.007092646,"about_ca_system_score_codex":0.0008319848,"about_ca_system_score_gemma":0.00054956693,"threshold_uncertainty_score":0.014102757},"labels":[],"label_agreement":null},{"id":"W2939922345","doi":"10.1061/(asce)co.1943-7862.0001660","title":"Capital Cost Comparison of Pavements Comprised of Insulation Layers: Case Study in Edmonton, Canada","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Climate change and permafrost","field":"Earth and Planetary Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"International Retinal Research Foundation","keywords":"Forensic engineering; Engineering; Business; Civil engineering","score_opus":0.016123331488504596,"score_gpt":0.22785513314258046,"score_spread":0.21173180165407587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939922345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99115574,0.00018623697,0.000608693,0.00008342737,0.0000051243187,0.00010873554,0.0006191418,0.000020575575,0.007212337],"genre_scores_gemma":[0.9957789,0.0001566532,0.0013474524,0.000012295047,0.0000015872166,0.000013435848,0.00038989977,0.0000066819857,0.002293081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9988952,0.0001425478,0.0000349552,0.0001064747,0.0004082616,0.00041248655],"domain_scores_gemma":[0.9984275,0.0004574393,0.00011514097,0.00006826953,0.00067752146,0.00025425342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007757468,0.00086485874,0.00048920757,0.0021770338,0.0018468872,0.0018624398,0.0016360771,0.0007593818,0.0023183643],"category_scores_gemma":[0.001681278,0.00031486753,0.0006310296,0.0027476312,0.0010502232,0.0006692934,0.000710712,0.00055336376,0.00013329234],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002051636,0.0021331494,0.20670992,0.0005929234,0.0003725478,0.0068877623,0.0011139823,0.6663376,0.010775783,0.0131903915,0.005511792,0.0843225],"study_design_scores_gemma":[0.00030419035,0.0015078138,0.503149,0.00019846989,0.00047105117,0.0010029033,0.014494472,0.45760587,0.007929349,0.0014799916,0.01160214,0.0002548236],"about_ca_topic_score_codex":0.9671022,"about_ca_topic_score_gemma":0.98795915,"teacher_disagreement_score":0.04811415,"about_ca_system_score_codex":0.04811415,"about_ca_system_score_gemma":0.017891444,"threshold_uncertainty_score":0.3490942},"labels":[],"label_agreement":null},{"id":"W2946943404","doi":"10.1061/(asce)co.1943-7862.0001670","title":"Novel Approach to Overcoming Discontinuity in Knowledge: Application in Value-Adding Frameworks in Construction Industry","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discontinuity (linguistics); Obstacle; Construction industry; Value (mathematics); Computer science; Field (mathematics); Realization (probability); Knowledge management; Management science; Industrial engineering; Engineering; Construction engineering; Mathematics; Machine learning","score_opus":0.020071105534090247,"score_gpt":0.2954097991528322,"score_spread":0.27533869361874197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946943404","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056698523,0.0016819995,0.86915046,0.010233991,0.00025012545,0.00044427198,0.00006993623,0.00024500448,0.061225675],"genre_scores_gemma":[0.534546,0.00090901187,0.4600758,0.00040540824,0.000088010434,0.00026850076,0.000051066785,0.000033909666,0.0036222],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99467754,0.0029498872,0.00033166664,0.0006036528,0.001147752,0.00028941833],"domain_scores_gemma":[0.99191767,0.004853923,0.00073353684,0.0010881083,0.0010419419,0.00036485473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007979128,0.0006048293,0.000666791,0.004021607,0.0028435197,0.0066144275,0.0022557932,0.0029175016,0.004044576],"category_scores_gemma":[0.0127922045,0.00035956042,0.001262063,0.003587865,0.010128174,0.00969688,0.00841396,0.0029199326,0.00030221295],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030015892,0.00015813441,0.00119593,0.00027648074,0.0000289383,0.00030385487,0.0071307197,0.0031990826,0.0009817736,0.9077157,0.0009356256,0.07804381],"study_design_scores_gemma":[0.000064266256,0.00018739693,0.0019620282,0.0005922883,0.00008063278,0.0008048309,0.012513442,0.054759227,0.002917779,0.8680586,0.05798275,0.00007660881],"about_ca_topic_score_codex":0.0030073668,"about_ca_topic_score_gemma":0.0040015075,"teacher_disagreement_score":0.007979128,"about_ca_system_score_codex":0.0038589123,"about_ca_system_score_gemma":0.0048594945,"threshold_uncertainty_score":0.04219812},"labels":[],"label_agreement":null},{"id":"W2982358567","doi":"10.1061/(asce)co.1943-7862.0001736","title":"Machine Learning Algorithms for Construction Projects Delay Risk Prediction","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":310,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Machine learning; Computer science; Artificial intelligence; Decision tree; Bayesian network; Set (abstract data type); Interdependence; Online machine learning; Data mining; Algorithm; Active learning (machine learning)","score_opus":0.022075671519458776,"score_gpt":0.27010243698121705,"score_spread":0.24802676546175828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2982358567","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04701467,0.0019840938,0.9472312,0.00083382684,0.00008921617,0.00013287467,0.0002965218,0.000716405,0.0017013368],"genre_scores_gemma":[0.70360506,0.0015569695,0.2903487,0.0002610522,0.00019162004,0.0004621257,0.0011313682,0.00005176937,0.002391301],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984939,0.0007230692,0.0001559193,0.00024204752,0.00026433653,0.0001206577],"domain_scores_gemma":[0.9926925,0.005743402,0.00044441927,0.00019114582,0.0008285207,0.000100004494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045340457,0.0009334774,0.0013978593,0.0017605042,0.00056161144,0.001501499,0.0013485728,0.0014872093,0.0012380476],"category_scores_gemma":[0.011649569,0.00042514474,0.00079069054,0.0018009852,0.00045667772,0.0012180993,0.0008843161,0.0023334015,0.00047698483],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006453077,0.00014542509,0.0033663556,0.0001008501,0.00006421142,0.000042634783,0.000056242072,0.87640995,0.0003228656,0.004355881,0.0013076925,0.113763295],"study_design_scores_gemma":[0.0000029416385,0.0000131383,0.00021134412,0.000009722153,0.0000037988063,0.0000049159266,0.000008855396,0.9963027,0.000087201064,0.003190019,0.00016138784,0.000003905245],"about_ca_topic_score_codex":0.00803505,"about_ca_topic_score_gemma":0.0046109837,"teacher_disagreement_score":0.00803505,"about_ca_system_score_codex":0.001123374,"about_ca_system_score_gemma":0.0017515596,"threshold_uncertainty_score":0.02397865},"labels":[],"label_agreement":null},{"id":"W2990810198","doi":"10.1061/(asce)co.1943-7862.0001747","title":"Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Modular programming; Risk analysis (engineering); Modular design; Risk management; Schedule; Process (computing); Computer science; Risk assessment; Systems engineering; Engineering","score_opus":0.009643938416521142,"score_gpt":0.23844107743330767,"score_spread":0.22879713901678653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990810198","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019522404,0.00003803037,0.9971655,0.00006740328,0.000004289603,0.000049596416,0.000017667004,0.000091300884,0.0006139896],"genre_scores_gemma":[0.268612,0.00030318755,0.72844666,0.00010458344,0.00005468585,0.00059131876,0.00019176696,0.00009174625,0.0016041268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99569726,0.0016543233,0.0002464134,0.00064714457,0.0014716178,0.00028329002],"domain_scores_gemma":[0.9897452,0.006246025,0.001537658,0.00053572404,0.0016680459,0.00026732392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0090187285,0.0014686546,0.0012818535,0.00319599,0.00090685947,0.0025389958,0.00352299,0.001758022,0.002277735],"category_scores_gemma":[0.017624093,0.0013686026,0.0017177395,0.0015098397,0.001744992,0.0029679718,0.0032484713,0.0023324003,0.00038910354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003827429,0.00007813497,0.0019968501,0.00014592092,0.00008995613,0.00013233555,0.0003198541,0.8986252,0.0022041127,0.04489735,0.0005448116,0.05092722],"study_design_scores_gemma":[0.00000936259,0.000040484727,0.0003283436,0.000035056066,0.000027722957,0.00004329581,0.000047307254,0.97582597,0.0008548129,0.021899458,0.00085919286,0.000029024388],"about_ca_topic_score_codex":0.0066832844,"about_ca_topic_score_gemma":0.0064759213,"teacher_disagreement_score":0.0090187285,"about_ca_system_score_codex":0.002429648,"about_ca_system_score_gemma":0.0045188507,"threshold_uncertainty_score":0.047696173},"labels":[],"label_agreement":null},{"id":"W3009442424","doi":"10.1061/(asce)co.1943-7862.0001826","title":"Fuzzy Monte Carlo Agent-Based Simulation of Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Monte Carlo method; Crew; Fuzzy logic; Computer science; Scope (computer science); Industrial engineering; Artificial intelligence; Engineering; Mathematics; Statistics","score_opus":0.00796218826544233,"score_gpt":0.18291965233514895,"score_spread":0.17495746406970664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009442424","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29503077,0.00020936201,0.6782474,0.0004941929,0.000061467676,0.00012292743,0.00031282258,0.00027243412,0.025248649],"genre_scores_gemma":[0.96800363,0.000098273355,0.028479533,0.00003043861,0.00000725352,0.000108139764,0.00009504255,0.000016655158,0.0031610325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996126,0.00016492348,0.00001846091,0.0000518377,0.000101961,0.000050105493],"domain_scores_gemma":[0.9992105,0.0004898326,0.00008478917,0.00004837407,0.00011845519,0.000048057344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081964344,0.00043616307,0.0005908456,0.0005524784,0.00053471274,0.0011150541,0.00087023556,0.0014113568,0.0020111764],"category_scores_gemma":[0.0021794569,0.0003111962,0.0005388865,0.00070769223,0.0007155819,0.0007249999,0.00068207434,0.0007030777,0.0001743253],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073118663,0.0000065274794,0.00018073943,0.0000030532967,0.0000039274073,0.000011220262,0.000012842839,0.99574596,0.00010728829,0.0032402815,0.000034327157,0.0006464289],"study_design_scores_gemma":[0.000002651346,0.0000036802921,0.000059105165,0.000001061735,0.0000014020517,0.0000019794172,0.0000042063098,0.9989568,0.000052421332,0.0008289144,0.00008552599,0.000002228983],"about_ca_topic_score_codex":0.027802035,"about_ca_topic_score_gemma":0.013317953,"teacher_disagreement_score":0.027802035,"about_ca_system_score_codex":0.0012354685,"about_ca_system_score_gemma":0.0012703986,"threshold_uncertainty_score":0.055280447},"labels":[],"label_agreement":null},{"id":"W3016837706","doi":"10.1061/(asce)co.1943-7862.0001854","title":"Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Fuzzy logic; Construction management; Computer science; Face (sociological concept); Management science; Engineering management; Construction industry; Systems engineering; Construction engineering; Engineering; Artificial intelligence","score_opus":0.0070153483480315075,"score_gpt":0.18949988606198395,"score_spread":0.18248453771395245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016837706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004004223,0.024400935,0.91000175,0.005288415,0.000876715,0.00009408887,0.000115419476,0.0002540264,0.054964438],"genre_scores_gemma":[0.2620988,0.030794943,0.6781926,0.001483335,0.0014008841,0.0003827774,0.00021869826,0.00007387387,0.02535406],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9982553,0.0006815599,0.00010748513,0.00016214332,0.0007225373,0.00007098333],"domain_scores_gemma":[0.9987208,0.00075258774,0.0001308862,0.00011250977,0.00024391271,0.000039302722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002910055,0.000798969,0.0007450737,0.0029286053,0.0011449532,0.0029629203,0.0011415754,0.0016867924,0.0049142023],"category_scores_gemma":[0.0030744781,0.00033585227,0.0012440657,0.0027530014,0.002826786,0.0028230182,0.0014407666,0.0019711815,0.00079996657],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022974293,0.00003757233,0.00045165743,0.00035516036,0.00007166159,0.00015232067,0.00048795587,0.03145836,0.0010384307,0.82486564,0.0075600413,0.13349822],"study_design_scores_gemma":[0.000018127368,0.000068735295,0.00063162064,0.00045956377,0.00003915015,0.00028649403,0.0004795784,0.09426321,0.00088689616,0.79996973,0.1028249,0.00007201241],"about_ca_topic_score_codex":0.005800274,"about_ca_topic_score_gemma":0.0064609116,"teacher_disagreement_score":0.005800274,"about_ca_system_score_codex":0.0028627368,"about_ca_system_score_gemma":0.0018717776,"threshold_uncertainty_score":0.020770729},"labels":[],"label_agreement":null},{"id":"W3034624594","doi":"10.1061/(asce)co.1943-7862.0001889","title":"Analysis of Relationships between Body Load and Training, Work Methods, and Work Rate: Overcoming the Novice Mason’s Risk Hump","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Musculoskeletal pain and rehabilitation","field":"Medicine","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Work (physics); SAFER; Apprenticeship; Productivity; Operations management; Engineering; Applied psychology; Psychology; Computer science; Computer security; Mechanical engineering","score_opus":0.019673107905511637,"score_gpt":0.27765388959487053,"score_spread":0.2579807816893589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034624594","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9983571,0.00009566036,0.00070312887,0.00003121755,0.0000065526656,0.000020425055,0.00033486675,0.000009684091,0.00044134218],"genre_scores_gemma":[0.99761426,0.00008259877,0.0009682712,0.000014625715,0.000009853019,0.000050603936,0.0006988264,0.0000055635805,0.0005554309],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993104,0.00018383563,0.00007387209,0.00016536223,0.00014962358,0.00011695482],"domain_scores_gemma":[0.9957659,0.0021171921,0.000896199,0.00027905454,0.0005298798,0.00041169205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013310652,0.00041300143,0.0003024101,0.00083677616,0.00034407672,0.000758111,0.0003688735,0.00043117628,0.002490354],"category_scores_gemma":[0.006009888,0.00020137613,0.0006261456,0.00063735433,0.00023795041,0.00043351,0.00074952823,0.00043273706,0.00060155324],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002014486,0.00014501346,0.98262805,0.00007184104,0.00010317472,0.00005896141,0.0010593912,0.00024608642,0.00072282343,0.00004496692,0.0002994059,0.014418921],"study_design_scores_gemma":[0.000002846993,0.00011764799,0.99704224,0.000022692246,0.000032186552,0.00004532171,0.0013741752,0.00089089834,0.00009705317,0.0000324179,0.0003356706,0.0000068744866],"about_ca_topic_score_codex":0.0048747007,"about_ca_topic_score_gemma":0.009917227,"teacher_disagreement_score":0.0048747007,"about_ca_system_score_codex":0.00023245467,"about_ca_system_score_gemma":0.00043097575,"threshold_uncertainty_score":0.009692669},"labels":[],"label_agreement":null},{"id":"W3042358698","doi":"10.1061/(asce)co.1943-7862.0001909","title":"Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; St. Joseph’s Healthcare Hamilton; Concordia University; University of New Brunswick; Alberta Energy","funders":"","keywords":"Modular design; Productivity; Value stream mapping; Process (computing); Lean manufacturing; Performance indicator; Manufacturing engineering; Production line; Engineering; Lean construction; Production (economics); Quality (philosophy); Prefabrication; Systems engineering; Computer science; Construction industry; Construction engineering; Civil engineering; Mechanical engineering; Business","score_opus":0.003026643427788348,"score_gpt":0.1731532312349105,"score_spread":0.17012658780712214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042358698","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008256442,0.000096941985,0.98579586,0.00016101092,0.000016909475,0.00010996883,0.00004025745,0.00044565802,0.0050769052],"genre_scores_gemma":[0.2534202,0.00029802663,0.743891,0.000051536706,0.000016364038,0.00020591497,0.00022635597,0.000093448005,0.0017971122],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99798954,0.0006899365,0.000119023636,0.00019969659,0.00082259096,0.0001792809],"domain_scores_gemma":[0.99890995,0.00030020686,0.00020682618,0.00012942667,0.0003739838,0.000079577316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034285139,0.0012591957,0.00045673866,0.0026333116,0.00053145067,0.0030015376,0.0014764168,0.00080938404,0.0016899745],"category_scores_gemma":[0.0029166816,0.0003249553,0.0007526087,0.0022620212,0.00090158335,0.0026285683,0.0020384116,0.0010570267,0.00042081263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009491372,0.00053819205,0.0049559083,0.00046491498,0.000100974146,0.0004741579,0.001407454,0.31716117,0.01668968,0.41245657,0.0022469782,0.24340901],"study_design_scores_gemma":[0.000025828913,0.00023301355,0.0017792418,0.00017499474,0.00007492963,0.0001947707,0.0007208473,0.86230993,0.011689409,0.09715487,0.025600297,0.00004193018],"about_ca_topic_score_codex":0.00331666,"about_ca_topic_score_gemma":0.0033400438,"teacher_disagreement_score":0.0034285139,"about_ca_system_score_codex":0.0017648267,"about_ca_system_score_gemma":0.0033085586,"threshold_uncertainty_score":0.018131971},"labels":[],"label_agreement":null},{"id":"W3137042417","doi":"10.1061/(asce)co.1943-7862.0002046","title":"Competitive Assessment of Ice and Frozen Silt Mat for Crane Ground Support Using Finite-Element Analysis","year":2021,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Smart Materials for Construction","field":"Environmental Science","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Silt; Finite element method; Geotechnical engineering; Engineering; Geology; Structural engineering; Civil engineering; Geomorphology","score_opus":0.007900033531098402,"score_gpt":0.23346713786289375,"score_spread":0.22556710433179533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3137042417","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95801663,0.00023116563,0.035395738,0.000062777886,0.000014202699,0.00005933507,0.0002469034,0.000087558015,0.005885736],"genre_scores_gemma":[0.9881413,0.000103548,0.010711746,0.000006641602,0.0000015993578,0.000025320991,0.00010272915,0.000008231034,0.00089884177],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982554,0.000027309157,0.000009641611,0.000022635382,0.00008986709,0.000024970306],"domain_scores_gemma":[0.99978787,0.0000953632,0.000031067706,0.000013872413,0.000057355952,0.000014531953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004755623,0.00040927652,0.00029601017,0.0009983706,0.00024460498,0.0007637685,0.00042827398,0.00070899306,0.0013564883],"category_scores_gemma":[0.00051754765,0.00021136718,0.0004513184,0.00031306795,0.00028750434,0.00034162562,0.00026319892,0.00018835817,0.00022154753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023364944,0.00020039661,0.01584654,0.00024310993,0.000033733148,0.0002582313,0.00009382722,0.86990035,0.08377593,0.0015871555,0.00033692754,0.027490178],"study_design_scores_gemma":[0.0000051107263,0.00013628768,0.0044792756,0.000016208756,0.00001654335,0.000027397482,0.00009418897,0.98434526,0.010334907,0.000118187665,0.0004169665,0.000009723628],"about_ca_topic_score_codex":0.004845552,"about_ca_topic_score_gemma":0.010960937,"teacher_disagreement_score":0.004845552,"about_ca_system_score_codex":0.00054463046,"about_ca_system_score_gemma":0.000540044,"threshold_uncertainty_score":0.009634733},"labels":[],"label_agreement":null},{"id":"W3166412559","doi":"10.1061/(asce)co.1943-7862.0002131","title":"How to Improve Crew Motivation and Performance on Construction Sites","year":2021,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Speculation; Crew; Audience measurement; Relevance (law); Engineering; Management; Political science; Media studies; Library science; Sociology; Engineering ethics; Computer science; Aeronautics; Law; Economics","score_opus":0.02559180406241549,"score_gpt":0.25721436780092277,"score_spread":0.2316225637385073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3166412559","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8762155,0.0013158681,0.015252058,0.03275582,0.00067187275,0.00039790117,0.00015110146,0.0006853118,0.07255454],"genre_scores_gemma":[0.97273594,0.00087820366,0.016024087,0.000998006,0.00013399796,0.00017688693,0.000096726864,0.000118914024,0.008837239],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9965329,0.0016444625,0.00007105182,0.0002872313,0.00075628614,0.00070812256],"domain_scores_gemma":[0.9921686,0.0024237344,0.0010067376,0.0004963123,0.0013084882,0.0025961518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005124055,0.00036769398,0.00035198833,0.0010254146,0.0013484458,0.0039514867,0.000854688,0.0014729915,0.00904345],"category_scores_gemma":[0.01915927,0.00018557117,0.00041485758,0.00087160023,0.001142511,0.0027412209,0.0020581372,0.0010963624,0.0023153962],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034183686,0.005424069,0.047799315,0.0009214903,0.00018320649,0.0001399713,0.0052222614,0.0041044056,0.0051786425,0.011918359,0.05651117,0.8622553],"study_design_scores_gemma":[0.0010199639,0.008527162,0.5616815,0.002937332,0.0005739688,0.0003272775,0.05308705,0.024302028,0.015424138,0.07438183,0.25736436,0.00037337682],"about_ca_topic_score_codex":0.0039624996,"about_ca_topic_score_gemma":0.008888948,"teacher_disagreement_score":0.00904345,"about_ca_system_score_codex":0.0013731073,"about_ca_system_score_gemma":0.005110875,"threshold_uncertainty_score":0.03025335},"labels":[],"label_agreement":null},{"id":"W3209324647","doi":"10.1061/(asce)co.1943-7862.0002214","title":"Digital Transformation in the Australian AEC Industry: Prevailing Issues and Prospective Leadership Thinking","year":2021,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Organizational Leadership and Management Strategies","field":"Business, Management and Accounting","cited_by":61,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Digital transformation; Knowledge management; Systems thinking; Strategic thinking; Soft systems methodology; Business; Engineering; Process management; Marketing; Computer science; Strategic planning; Information system; Management information systems","score_opus":0.01944689527516763,"score_gpt":0.21233912672365648,"score_spread":0.19289223144848885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3209324647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88519704,0.0019742204,0.0026991395,0.0398082,0.000118853226,0.000084428546,0.000015918666,0.000020608146,0.07008166],"genre_scores_gemma":[0.99634933,0.0008078479,0.00045323293,0.0006043783,0.000013283159,0.000014285462,0.0000058291353,0.0000026295327,0.0017491918],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99493754,0.0024291542,0.00018592272,0.0002741912,0.0010514783,0.0011216897],"domain_scores_gemma":[0.9930488,0.002543692,0.0006758773,0.00030367353,0.0018940849,0.0015339176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007122892,0.00020487167,0.00018259716,0.0026165622,0.008383834,0.010044366,0.0010034876,0.0013636325,0.002099577],"category_scores_gemma":[0.0095831305,0.00021223919,0.00023110397,0.002187447,0.012421591,0.0040182183,0.0042125504,0.0027919183,0.00022524812],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042227795,0.0003015872,0.05356442,0.00031648355,0.00001409781,0.0009689542,0.68364924,0.00027579095,0.0012620413,0.15143059,0.0031943258,0.104980186],"study_design_scores_gemma":[0.000009376865,0.00012505183,0.051838826,0.00044860365,0.000011802777,0.0003063278,0.8738023,0.001355054,0.00053775945,0.026370548,0.045155313,0.00003891996],"about_ca_topic_score_codex":0.029947681,"about_ca_topic_score_gemma":0.047441114,"teacher_disagreement_score":0.029947681,"about_ca_system_score_codex":0.01014696,"about_ca_system_score_gemma":0.016387984,"threshold_uncertainty_score":0.07362169},"labels":[],"label_agreement":null},{"id":"W4207013828","doi":"10.1061/(asce)co.1943-7862.0002250","title":"Hybrid GA-MANFIS Model for Organizational Competencies and Performance in Construction","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources","funders":"","keywords":"Adaptive neuro fuzzy inference system; Computer science; Machine learning; Artificial intelligence; Artificial neural network; Fuzzy logic; Neuro-fuzzy; Inference; Data mining; Fuzzy control system","score_opus":0.0044025748185134534,"score_gpt":0.1593667130382603,"score_spread":0.15496413821974686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4207013828","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09391422,0.001275537,0.8741572,0.0008098745,0.00014023115,0.00013234129,0.00031552973,0.0003770318,0.028878026],"genre_scores_gemma":[0.9462358,0.0004523779,0.043631006,0.00008687685,0.000028020702,0.0002278946,0.00015418636,0.00001946849,0.0091644935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970156,0.000090298614,0.000013264804,0.00007932262,0.00007185885,0.000043705673],"domain_scores_gemma":[0.9997936,0.00009571882,0.00002631969,0.000009725839,0.000063283594,0.000011343452],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046401724,0.0007525155,0.0006237208,0.0007444949,0.00046946894,0.0010221364,0.0013954897,0.0014530988,0.002271855],"category_scores_gemma":[0.0008562253,0.00026779386,0.00074189535,0.00067010813,0.00048786617,0.0005594568,0.0006457831,0.00075035973,0.00029168106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000110330475,0.000013156284,0.00056917925,0.000016048474,0.00002077849,0.000062495266,0.00002557173,0.9898261,0.00035820837,0.003530402,0.00018264777,0.0053842827],"study_design_scores_gemma":[0.0000019727345,0.000009573384,0.00015761376,0.0000037087962,0.000004701001,0.000008299965,0.0000068058207,0.9986577,0.00007189439,0.00087736023,0.00019687916,0.0000034819525],"about_ca_topic_score_codex":0.020388076,"about_ca_topic_score_gemma":0.016227907,"teacher_disagreement_score":0.020388076,"about_ca_system_score_codex":0.0010806894,"about_ca_system_score_gemma":0.0010617656,"threshold_uncertainty_score":0.040538788},"labels":[],"label_agreement":null},{"id":"W4224272315","doi":"10.1061/(asce)co.1943-7862.0002281","title":"Multiobjective Optimization Model for the Life Cycle Cost-Sustainability Trade-Off Problem of Building Upgrading Using a Generic Sustainability Assessment Tool","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Life-cycle assessment; Upgrade; Computer science; Environmental economics; Economics; Production (economics); Ecology","score_opus":0.00911859585731036,"score_gpt":0.24856390713186924,"score_spread":0.23944531127455887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224272315","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06586495,0.001141348,0.9093814,0.0006502771,0.00014245228,0.00029974844,0.00043737364,0.00025099338,0.021831453],"genre_scores_gemma":[0.87634295,0.0010713375,0.10848478,0.00020323065,0.000067311725,0.0011399614,0.0004625484,0.000060320177,0.0121676335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993905,0.00026205622,0.000025375184,0.00012090271,0.000091127695,0.00011003614],"domain_scores_gemma":[0.99939454,0.00039370387,0.00008332481,0.000017181246,0.00008124073,0.000029985289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012244111,0.0015027126,0.0011968993,0.0009109714,0.0004895017,0.0017350585,0.0014373509,0.0020310334,0.0038326783],"category_scores_gemma":[0.0014638668,0.00056442205,0.0015688259,0.0010777094,0.0006132144,0.00083078735,0.0011680507,0.0015381837,0.00034335777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009136068,0.000016051234,0.00018837507,0.000034045435,0.000014818571,0.00003658845,0.000009909449,0.9960278,0.00016743134,0.0015427918,0.0001335871,0.0018193915],"study_design_scores_gemma":[0.00000483563,0.000022454518,0.00009093526,0.0000055974797,0.0000074092495,0.000006656008,0.00000899051,0.9989182,0.000046730955,0.00064528675,0.00023991014,0.0000030599726],"about_ca_topic_score_codex":0.010160993,"about_ca_topic_score_gemma":0.009177502,"teacher_disagreement_score":0.010160993,"about_ca_system_score_codex":0.0015308347,"about_ca_system_score_gemma":0.0017241825,"threshold_uncertainty_score":0.02020365},"labels":[],"label_agreement":null},{"id":"W4234274816","doi":"10.1061/(asce)0733-9364(2003)129:4(471)","title":"Closure to “Improving Design Coordination for Building Projects. I: Information Model” by Tarek Hegazy, Essam Zaneldin, and Donald Grierson","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Closure (psychology); Computer science; Sociology; Architectural engineering; Political science; Engineering","score_opus":0.005875316181565935,"score_gpt":0.18095947952348362,"score_spread":0.17508416334191768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234274816","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009007164,0.017155452,0.74596614,0.13815328,0.012745009,0.00026562685,0.0004395849,0.00083682494,0.07543092],"genre_scores_gemma":[0.51444614,0.035076536,0.3181381,0.02675132,0.01301157,0.00125522,0.0022430513,0.001275784,0.08780228],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99257845,0.0034258715,0.00040138475,0.0010696113,0.0020785322,0.00044627892],"domain_scores_gemma":[0.98690003,0.00744552,0.0005789743,0.001990605,0.00248168,0.0006031662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071231686,0.0013093051,0.0013453753,0.002035464,0.0024906928,0.00793176,0.0028647576,0.0048674056,0.013341007],"category_scores_gemma":[0.026575463,0.0009441336,0.0018259126,0.004781828,0.0051916996,0.014572359,0.0057976157,0.0055913245,0.0026947535],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015889421,0.00016309816,0.0007165309,0.00038505776,0.000073590556,0.00012921335,0.0015117583,0.027131915,0.00048958504,0.6627072,0.16774485,0.13878824],"study_design_scores_gemma":[0.00008807336,0.00012249262,0.0006705558,0.00063364854,0.0001181293,0.00016649945,0.0011555621,0.08192641,0.0017634894,0.64580065,0.2674451,0.000109329914],"about_ca_topic_score_codex":0.015219864,"about_ca_topic_score_gemma":0.0077834264,"teacher_disagreement_score":0.015219864,"about_ca_system_score_codex":0.00447825,"about_ca_system_score_gemma":0.0063044005,"threshold_uncertainty_score":0.04463011},"labels":[],"label_agreement":null},{"id":"W4247851133","doi":"10.1061/(asce)0733-9364(2006)132:5(542)","title":"Discussion of “Critical Path Method with Multiple Calendars” by Kyunghwan Kim and Jesús M. de la Garza","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Path (computing); Mathematics; Physics; Computer science; Programming language","score_opus":0.007997066431104666,"score_gpt":0.29590843307746256,"score_spread":0.2879113666463579,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247851133","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025669937,0.0029669774,0.9245027,0.049771518,0.0032671024,0.00016994671,0.000064559885,0.00026330596,0.016426949],"genre_scores_gemma":[0.16880612,0.0047341823,0.7786579,0.021710549,0.0058219912,0.0010395513,0.000105636296,0.0005499583,0.018574074],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98929745,0.007564596,0.0003194639,0.00073067425,0.0018463365,0.00024151155],"domain_scores_gemma":[0.96079314,0.032837965,0.0009342591,0.0015698656,0.0033897588,0.00047494753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020212738,0.0008506322,0.0007514893,0.0018467007,0.002048627,0.0030994564,0.0040392857,0.0043765213,0.011663659],"category_scores_gemma":[0.068363756,0.00066654634,0.001479618,0.0033665693,0.004353279,0.007739799,0.0023282242,0.006824504,0.0013104834],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065517124,0.000029894372,0.00030153288,0.00015075,0.00003230214,0.00013752423,0.00026918494,0.011360232,0.00019795274,0.91978145,0.025371708,0.04230197],"study_design_scores_gemma":[0.00007836088,0.000056474437,0.00023011476,0.00023141254,0.000028563278,0.0001710247,0.00022110765,0.06841793,0.0007132713,0.8336082,0.096185245,0.00005836006],"about_ca_topic_score_codex":0.004759713,"about_ca_topic_score_gemma":0.0045745526,"teacher_disagreement_score":0.020212738,"about_ca_system_score_codex":0.00273313,"about_ca_system_score_gemma":0.004385411,"threshold_uncertainty_score":0.10689646},"labels":[],"label_agreement":null},{"id":"W4249731435","doi":"10.1061/(asce)co.1943-7862.0000173","title":"Discussion of “Time-Profit Trade-Off Analysis for Construction Projects” by Ahmed Senouci and Khaled El-Rayes","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Profit (economics); Economics; Operations research; Mathematical economics; Microeconomics; Mathematics","score_opus":0.014128386014970956,"score_gpt":0.27585831286288826,"score_spread":0.2617299268479173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249731435","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07116412,0.025755463,0.32228512,0.32967404,0.00482323,0.00023895844,0.0005811189,0.00019752067,0.24528041],"genre_scores_gemma":[0.92053366,0.0071841003,0.022670994,0.011837555,0.0040067458,0.00019099198,0.00012357128,0.00013436528,0.033317853],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9964095,0.0020001489,0.0001517602,0.0003156578,0.0007848893,0.00033797385],"domain_scores_gemma":[0.9912163,0.007290965,0.00032405864,0.00017515045,0.0008461834,0.00014743647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005155596,0.00084787793,0.0011962155,0.001312402,0.0018085007,0.005820884,0.002553107,0.007402022,0.01160633],"category_scores_gemma":[0.015181375,0.00057467417,0.0024590795,0.0021839058,0.0034121156,0.0064610373,0.0018333985,0.006371732,0.0007075628],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007520434,0.000047426805,0.00034937798,0.00014518706,0.000046944948,0.0003100108,0.00023467709,0.025567614,0.00031361933,0.9468503,0.015180023,0.010879663],"study_design_scores_gemma":[0.000029330957,0.00007257516,0.000899928,0.00020632075,0.000047428435,0.00015804639,0.000620472,0.059980698,0.00045537698,0.8976293,0.039835468,0.00006508866],"about_ca_topic_score_codex":0.0047633513,"about_ca_topic_score_gemma":0.0041694604,"teacher_disagreement_score":0.01160633,"about_ca_system_score_codex":0.004234518,"about_ca_system_score_gemma":0.0022283716,"threshold_uncertainty_score":0.03882706},"labels":[],"label_agreement":null},{"id":"W4281291835","doi":"10.1061/(asce)co.1943-7862.0002319","title":"VR–MOCAP-Enabled Ergonomic Risk Assessment of Workstation Prototypes in Offsite Construction","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Musculoskeletal pain and rehabilitation","field":"Medicine","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workstation; Motion capture; Virtual reality; Computer science; Human factors and ergonomics; Human–computer interaction; Simulation; Population; Percentile; Motion (physics); Engineering; Poison control; Artificial intelligence; Medicine; Statistics","score_opus":0.0030757715950442263,"score_gpt":0.22763119747481955,"score_spread":0.22455542587977534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281291835","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9093259,0.00018232926,0.08737491,0.000045958353,0.000033335822,0.0003386032,0.00018784738,0.00046277462,0.0020481704],"genre_scores_gemma":[0.9436751,0.00014996542,0.05467178,0.000025364487,0.000008817405,0.00022566023,0.00023633026,0.000029994313,0.0009771256],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99900407,0.00039907405,0.00005839811,0.00013415504,0.0003365043,0.00006780413],"domain_scores_gemma":[0.9989317,0.00037644312,0.00017785441,0.00017155583,0.0002610369,0.00008135472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095947215,0.0006619144,0.0003522169,0.0010109099,0.00020072589,0.0007549936,0.0007664206,0.0008930929,0.0017058298],"category_scores_gemma":[0.0030338964,0.0003470588,0.00057403254,0.00034297138,0.00023756755,0.000488459,0.0009761252,0.0002772744,0.00039303795],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026530582,0.0029928677,0.06808543,0.0016858258,0.0003079483,0.002042337,0.006138545,0.07948845,0.3549221,0.0014536318,0.0021920172,0.47803783],"study_design_scores_gemma":[0.0002487923,0.011679793,0.45901552,0.0005553237,0.0004465921,0.0030686643,0.005155743,0.40550694,0.103665285,0.0014125375,0.008771267,0.00047348815],"about_ca_topic_score_codex":0.0011493,"about_ca_topic_score_gemma":0.0016278162,"teacher_disagreement_score":0.0017058298,"about_ca_system_score_codex":0.0002283784,"about_ca_system_score_gemma":0.00033626496,"threshold_uncertainty_score":0.0057065487},"labels":[],"label_agreement":null},{"id":"W4283367604","doi":"10.1061/(asce)co.1943-7862.0002330","title":"Implementing Construction Planning and Control Software: A Specialized Contractor Perspective","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Control (management); Software; Computer science; Order (exchange); Quality (philosophy); Process management; Digital transformation; Complementarity (molecular biology); Perspective (graphical); Knowledge management; Engineering management; Business; Engineering","score_opus":0.004252576246389947,"score_gpt":0.19895317556141334,"score_spread":0.1947005993150234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283367604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5543852,0.0022338831,0.17643923,0.021719206,0.00015924752,0.001088768,0.00007929356,0.00028840182,0.2436067],"genre_scores_gemma":[0.9473062,0.0019606906,0.035016667,0.001166471,0.000048951373,0.00017679922,0.00007818588,0.000080040016,0.01416603],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.97389936,0.015776046,0.0008649702,0.0011090222,0.005485369,0.0028652307],"domain_scores_gemma":[0.9810946,0.0089578815,0.0011739851,0.0019133835,0.0036005795,0.003259501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021518815,0.0005925173,0.00029678896,0.0022164918,0.0052655856,0.011692166,0.0024802585,0.003031509,0.005200265],"category_scores_gemma":[0.017035278,0.0005410799,0.000349061,0.001990422,0.010133631,0.008656626,0.00520647,0.0032024847,0.0007505453],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018286849,0.0015816313,0.022314781,0.00094344775,0.00006480212,0.0023449338,0.29222777,0.009774118,0.008208753,0.3600819,0.009473876,0.2928011],"study_design_scores_gemma":[0.000075841686,0.0021841282,0.017657584,0.0025238213,0.000065774744,0.0025720522,0.54169995,0.028601762,0.009360381,0.043829937,0.35124916,0.00017966772],"about_ca_topic_score_codex":0.012088444,"about_ca_topic_score_gemma":0.012782537,"teacher_disagreement_score":0.021518815,"about_ca_system_score_codex":0.008399976,"about_ca_system_score_gemma":0.019847937,"threshold_uncertainty_score":0.113803685},"labels":[],"label_agreement":null},{"id":"W4286684883","doi":"10.1061/(asce)co.1943-7862.0002367","title":"Methodology for Extended Reality–Enabled Experimental Research in Construction Engineering and Management","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Virtual Reality Applications and Impacts","field":"Computer Science","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workflow; Domain (mathematical analysis); Process (computing); Status quo; Computer science; Knowledge management; Engineering management; Management science; Data science; Engineering; Political science","score_opus":0.08210624794720144,"score_gpt":0.3526401427000537,"score_spread":0.2705338947528523,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286684883","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004639707,0.00078134023,0.9676375,0.0008699269,0.00020575788,0.011542588,0.00036417565,0.00016751513,0.013791541],"genre_scores_gemma":[0.04767431,0.0008397002,0.8937447,0.00046191725,0.00007561494,0.054950405,0.0002766428,0.00006424301,0.0019125144],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9055768,0.08216058,0.003028905,0.0038393857,0.004491707,0.0009025005],"domain_scores_gemma":[0.9104454,0.065044746,0.005104289,0.013701111,0.0048170616,0.00088733423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.07981878,0.0014169728,0.0014968051,0.0049707755,0.0027014164,0.0067344364,0.004873972,0.0031620627,0.016176252],"category_scores_gemma":[0.07683269,0.0011379806,0.0028406046,0.0048219655,0.010166659,0.0054680165,0.0067420485,0.004169011,0.0023261474],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024774874,0.00085973967,0.002483759,0.0032246388,0.00018001685,0.00048047435,0.010857022,0.0061399653,0.0024626341,0.8734495,0.0023979323,0.097216584],"study_design_scores_gemma":[0.00085962913,0.00275395,0.004650878,0.0055072797,0.00025737178,0.00063540286,0.016332673,0.02237238,0.006026666,0.7467574,0.19359548,0.0002510049],"about_ca_topic_score_codex":0.001887405,"about_ca_topic_score_gemma":0.0025215044,"teacher_disagreement_score":0.07981878,"about_ca_system_score_codex":0.005366321,"about_ca_system_score_gemma":0.011972909,"threshold_uncertainty_score":0.42212707},"labels":[],"label_agreement":null},{"id":"W4286789963","doi":"10.1061/(asce)co.1943-7862.0002343","title":"BIM Critical-Success Factors in the Design Phase and Risk Management: Exploring Knowledge and Maturity Mediating Effect","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Structural equation modeling; Maturity (psychological); Building information modeling; Critical success factor; Capability Maturity Model; Knowledge management; Path analysis (statistics); Process (computing); Process management; Sample (material); Phase (matter); Computer science; Engineering; Psychology; Operations management; Physics","score_opus":0.013489637352717493,"score_gpt":0.23430595284469022,"score_spread":0.22081631549197273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286789963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9868155,0.00023070768,0.0042706556,0.0003325476,0.00000498005,0.00006619455,0.000028856026,0.000010453511,0.008240077],"genre_scores_gemma":[0.99804497,0.00009057538,0.0015625281,0.000012289531,0.0000020365837,0.00002055814,0.000012876494,0.0000015556319,0.00025272128],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99346596,0.003147381,0.0004464548,0.00047710398,0.0018101865,0.00065285154],"domain_scores_gemma":[0.9548972,0.030108074,0.008293662,0.0011914065,0.0033792849,0.0021304602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063766176,0.0006719525,0.00039449663,0.003139069,0.0007647987,0.0028760731,0.00049952243,0.00070294645,0.0032800667],"category_scores_gemma":[0.028431198,0.00037312042,0.0006857609,0.0014180297,0.0020398176,0.0025353152,0.0030390166,0.0012153942,0.0001621441],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002074899,0.0012784197,0.81349826,0.00047875178,0.0002580028,0.0006402272,0.03941089,0.0026439184,0.002673495,0.023120834,0.00027881938,0.11551083],"study_design_scores_gemma":[0.000034225835,0.0006586776,0.9057774,0.0007585452,0.0003078719,0.00048561406,0.057815127,0.011284325,0.003947237,0.013614889,0.005216555,0.000099623525],"about_ca_topic_score_codex":0.0046269414,"about_ca_topic_score_gemma":0.0044170152,"teacher_disagreement_score":0.0063766176,"about_ca_system_score_codex":0.002532643,"about_ca_system_score_gemma":0.005060166,"threshold_uncertainty_score":0.033723235},"labels":[],"label_agreement":null},{"id":"W4295799731","doi":"10.1061/(asce)co.1943-7862.0002402","title":"Modeling Microtunnel Boring Machine Penetration Rate Using a Mechanistic Approach","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Tunneling and Rock Mechanics","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Penetration (warfare); Penetration rate; Rate of penetration; Computer science; Penetration test; Geotechnical engineering; Mechanical engineering; Geology; Engineering; Operations research; Drilling","score_opus":0.009055173439186302,"score_gpt":0.17749730048401471,"score_spread":0.16844212704482842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4295799731","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2842797,0.0002803383,0.7045431,0.00016058669,0.000022941365,0.00012342894,0.00016306672,0.00021398015,0.010212774],"genre_scores_gemma":[0.9774989,0.0003359719,0.020085223,0.000014938509,0.000005540807,0.00009220572,0.00005630953,0.00001869418,0.001892184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997825,0.000039373106,0.000012840795,0.000052574953,0.00007503142,0.000037564063],"domain_scores_gemma":[0.999501,0.00025302364,0.00012294632,0.00004561495,0.00006195811,0.000015426507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005671808,0.00056331925,0.0004219301,0.00081656844,0.00032277388,0.0008977554,0.0013429117,0.00173664,0.0016594415],"category_scores_gemma":[0.0012205894,0.0006005433,0.0007349927,0.0005339865,0.00055144646,0.00159408,0.000504267,0.0005053186,0.00026110865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009251198,0.000055093926,0.0021789998,0.00004676947,0.00000975985,0.00006996299,0.000039407667,0.981489,0.005721361,0.0038608026,0.000050623807,0.006468992],"study_design_scores_gemma":[0.0000016749233,0.000019523797,0.0007561223,0.000004565231,0.000004675409,0.000029164792,0.000016138047,0.9972168,0.0010129953,0.000734604,0.00019835048,0.000005256112],"about_ca_topic_score_codex":0.0033139547,"about_ca_topic_score_gemma":0.0035270336,"teacher_disagreement_score":0.0033139547,"about_ca_system_score_codex":0.00065013644,"about_ca_system_score_gemma":0.00091038214,"threshold_uncertainty_score":0.006589353},"labels":[],"label_agreement":null},{"id":"W4307138863","doi":"10.1061/(asce)co.1943-7862.0002420","title":"Assessment of Digital Twins to Reassign Multiskilled Workers in Offsite Construction Based on Lean Thinking","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Flexibility (engineering); Lean manufacturing; Productivity; Production (economics); Lean construction; Identification (biology); Lead time; Computer science; Operations management; Manufacturing engineering; Engineering; Industrial engineering; Construction industry; Construction engineering","score_opus":0.006418361941288954,"score_gpt":0.20831597493669698,"score_spread":0.20189761299540804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307138863","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9720104,0.00007811393,0.025049604,0.00007199502,0.000014266064,0.00018638716,0.000082602855,0.00006043331,0.0024462168],"genre_scores_gemma":[0.9741742,0.00007441146,0.025075173,0.000011863851,0.0000019846839,0.0000830938,0.00009277796,0.000011743874,0.0004747358],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99774444,0.00086972327,0.00012842286,0.00022410955,0.000838378,0.00019491934],"domain_scores_gemma":[0.99572337,0.0016995944,0.00082925154,0.0003753563,0.0009902453,0.00038222605],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003922352,0.00081317325,0.000428996,0.0015923292,0.00054595375,0.001737906,0.0010118965,0.0007798909,0.0013848586],"category_scores_gemma":[0.008675346,0.00032389903,0.0006047762,0.00086727424,0.0008574982,0.0013651625,0.0013755739,0.0005319488,0.00024891453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034045093,0.002746946,0.25621545,0.0009833811,0.00027687268,0.0009361195,0.0046700886,0.31030676,0.032446045,0.007093856,0.0009886441,0.3799313],"study_design_scores_gemma":[0.00014738322,0.012171073,0.21226093,0.00049493514,0.0003915681,0.00061559054,0.017970353,0.69296926,0.04801768,0.00793203,0.006761401,0.00026779948],"about_ca_topic_score_codex":0.0031468705,"about_ca_topic_score_gemma":0.0057172026,"teacher_disagreement_score":0.003922352,"about_ca_system_score_codex":0.0016747022,"about_ca_system_score_gemma":0.001726994,"threshold_uncertainty_score":0.020743668},"labels":[],"label_agreement":null},{"id":"W4308565161","doi":"10.1061/(asce)co.1943-7862.0002393","title":"Optimizing Modularity of Prefabricated Residential Plumbing Systems for Construction in Remote Communities","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Prefabrication; Modular programming; Modularity (biology); Computer science; Sorting; Context (archaeology); Multi-objective optimization; Piping; Systems engineering; Civil engineering; Engineering; Mechanical engineering; Algorithm","score_opus":0.009266445138573484,"score_gpt":0.1945422077129463,"score_spread":0.18527576257437284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308565161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7886862,0.00014225038,0.20329556,0.00009217034,0.000010242017,0.00017093131,0.00010105724,0.00018710966,0.007314337],"genre_scores_gemma":[0.95988876,0.00005193121,0.038498364,0.000007400285,0.0000013308455,0.000053426964,0.000060967115,0.000019374782,0.001418304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999741,0.000058804304,0.000007992881,0.00004995666,0.00005570066,0.00008651384],"domain_scores_gemma":[0.999703,0.00009139444,0.00006644732,0.000023558618,0.00006901314,0.000046502555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000667092,0.0007742801,0.0004318383,0.0007485478,0.0006619599,0.00074316695,0.00077920343,0.00056329026,0.0019167656],"category_scores_gemma":[0.00094028283,0.00037228758,0.0004651532,0.00055611826,0.00042846057,0.0005322798,0.0007387756,0.00039476747,0.00017646022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043315693,0.00004729793,0.0024962153,0.00004651134,0.000011575347,0.000080442376,0.000047036767,0.9743542,0.007375566,0.0011346618,0.000103048806,0.014260105],"study_design_scores_gemma":[0.000013923309,0.00017275671,0.004588032,0.000011130131,0.000018919236,0.000037542955,0.00016613028,0.9900455,0.0030396748,0.0013690479,0.0005267358,0.00001059573],"about_ca_topic_score_codex":0.033385452,"about_ca_topic_score_gemma":0.06963975,"teacher_disagreement_score":0.033385452,"about_ca_system_score_codex":0.0023523509,"about_ca_system_score_gemma":0.002041314,"threshold_uncertainty_score":0.06638229},"labels":[],"label_agreement":null},{"id":"W4310790240","doi":"10.1061/jcemd4.coeng-12811","title":"A Deep-Learning Classification Framework for Reducing Communication Errors in Dynamic Hand Signaling for Crane Operation","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Hand Gesture Recognition Systems","field":"Computer Science","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Inference; Artificial intelligence; Deep learning; Set (abstract data type); Machine learning; Field (mathematics); SIGNAL (programming language); Object (grammar); Recurrent neural network; Task (project management); Operator (biology); Artificial neural network; Engineering","score_opus":0.012405953474234451,"score_gpt":0.24613886327813314,"score_spread":0.2337329098038987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310790240","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.076813534,0.0007945406,0.91756624,0.000339612,0.00012671531,0.000049951755,0.00021896072,0.0020501802,0.0020401834],"genre_scores_gemma":[0.8119138,0.00047862195,0.1759701,0.000289683,0.00007874817,0.00011414776,0.0009018953,0.00012852815,0.010124512],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997466,0.00003611165,0.000014018502,0.00007652145,0.00006346199,0.000063247986],"domain_scores_gemma":[0.99968445,0.000100954174,0.00004357645,0.000028349303,0.00012196889,0.000020676172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005452764,0.0008143189,0.0005808212,0.0005171598,0.00033823954,0.00055382465,0.0013237963,0.0010115535,0.0020048115],"category_scores_gemma":[0.0011051112,0.00034114296,0.0006084287,0.00043710766,0.00032620496,0.000790544,0.00071846816,0.0013052064,0.0006049618],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028849352,0.00021036624,0.0017605503,0.000101112186,0.000082559694,0.00020928588,0.000111300345,0.51005447,0.02289348,0.0035078467,0.004735056,0.4560455],"study_design_scores_gemma":[0.0000027078406,0.000026974316,0.00018219346,0.0000051472493,0.000007901595,0.000009794508,0.000006664086,0.99723226,0.001704674,0.00055209716,0.00026585677,0.0000037385057],"about_ca_topic_score_codex":0.016574437,"about_ca_topic_score_gemma":0.017653747,"teacher_disagreement_score":0.016574437,"about_ca_system_score_codex":0.00087016844,"about_ca_system_score_gemma":0.0013585187,"threshold_uncertainty_score":0.032955945},"labels":[],"label_agreement":null},{"id":"W4320081667","doi":"10.1061/jcemd4.coeng-13385","title":"Modular Construction/Off-Site Construction","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick; University of Alberta","funders":"","keywords":"Modular design; Modular construction; Computer science; Construction engineering; Engineering; Programming language","score_opus":0.004072894585175111,"score_gpt":0.1744510038814622,"score_spread":0.17037810929628708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320081667","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45160544,0.00046217188,0.08455631,0.00025249863,0.00021215314,0.00017380936,0.00059495197,0.0011312019,0.46101153],"genre_scores_gemma":[0.91772306,0.0002693556,0.026792368,0.00007884166,0.000043489123,0.0000452246,0.0005967328,0.00029203246,0.054158762],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99945503,0.000059753696,0.00002690345,0.000070401686,0.00024266183,0.00014523632],"domain_scores_gemma":[0.9996124,0.000039022598,0.000055711025,0.0001435154,0.00008911609,0.000060166214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000516277,0.0006958058,0.00023940638,0.0011532513,0.00043839417,0.0009699584,0.0005182128,0.00041974653,0.026590642],"category_scores_gemma":[0.0006449869,0.00023186897,0.0004873786,0.00077519857,0.00087489065,0.0010395932,0.0021786387,0.000417757,0.0051543904],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004967229,0.00042984376,0.027378187,0.0005349959,0.000048155256,0.0011369481,0.0011910052,0.015509516,0.062750645,0.14179394,0.0136239,0.73510617],"study_design_scores_gemma":[0.00010874881,0.0015834135,0.25849512,0.00073233753,0.00019738212,0.00876329,0.0054448326,0.051124427,0.089689225,0.10294204,0.48077255,0.00014664319],"about_ca_topic_score_codex":0.00086679996,"about_ca_topic_score_gemma":0.003119261,"teacher_disagreement_score":0.026590642,"about_ca_system_score_codex":0.0003464788,"about_ca_system_score_gemma":0.000585995,"threshold_uncertainty_score":0.08895457},"labels":[],"label_agreement":null},{"id":"W4320524425","doi":"10.1061/jcemd4.coeng-11929","title":"Blockchain Technology toward Smart Construction: Review and Future Directions","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Blockchain Technology Applications and Security","field":"Computer Science","cited_by":88,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Blockchain; Scopus; Supply chain; Supply chain management; Knowledge management; Computer science; Smart contract; Building information modeling; Data science; Business; Process management; Engineering management; Engineering; Operations management; Marketing; Political science","score_opus":0.005044733868482049,"score_gpt":0.20567559701271643,"score_spread":0.20063086314423437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320524425","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00014947129,0.9983169,0.0001356168,0.00070301135,0.000235065,0.0000071102045,0.000010236195,0.0000036808503,0.00043894842],"genre_scores_gemma":[0.0010323821,0.99834263,0.00013639947,0.00022675398,0.00015885134,0.000008920534,0.000009609947,0.0000010293074,0.000083429106],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99852496,0.00042444284,0.0002849947,0.00018406835,0.00046563987,0.00011592041],"domain_scores_gemma":[0.98977494,0.0068198037,0.0008895392,0.00016666274,0.0020442891,0.00030480287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003978714,0.0007780897,0.0016098376,0.0060831443,0.0007270395,0.0029017224,0.00125861,0.002023683,0.003524934],"category_scores_gemma":[0.008299396,0.00045151956,0.001178644,0.010298702,0.0012689916,0.0038317465,0.0013850657,0.0017289396,0.0008088983],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010277138,0.00010152912,0.00051183946,0.17387505,0.00022600533,0.0003046798,0.0006919144,0.0009866782,0.00083189795,0.01721868,0.02179846,0.7833505],"study_design_scores_gemma":[0.000021675995,0.00016550293,0.0020102174,0.13942216,0.0008399828,0.0009456077,0.0010510806,0.00045555065,0.0005973385,0.010082362,0.8443461,0.00006236537],"about_ca_topic_score_codex":0.003377375,"about_ca_topic_score_gemma":0.005307191,"teacher_disagreement_score":0.0060831443,"about_ca_system_score_codex":0.0019292948,"about_ca_system_score_gemma":0.009351317,"threshold_uncertainty_score":0.021041691},"labels":[],"label_agreement":null},{"id":"W4367323216","doi":"10.1061/jcemd4.coeng-13109","title":"Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of New Brunswick","funders":"","keywords":"Lift (data mining); Modular design; Motion planning; Obstacle; Planner; Tower crane; Engineering; Robotics; Set (abstract data type); Computer science; Mobile robot; Obstacle avoidance; Robot; Simulation; Artificial intelligence","score_opus":0.010374025732267863,"score_gpt":0.21915421308575692,"score_spread":0.20878018735348905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367323216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3290068,0.0001519496,0.66350424,0.000091215195,0.000016142843,0.00022254561,0.00021209322,0.0009035483,0.00589149],"genre_scores_gemma":[0.9005913,0.00012062531,0.097453214,0.00001008303,0.0000033811596,0.000095690404,0.00020302238,0.00005040578,0.0014724772],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998536,0.000030201007,0.0000055060946,0.000035396075,0.000031432573,0.000043879307],"domain_scores_gemma":[0.9998072,0.00007042058,0.000032070606,0.000020381156,0.000030185007,0.000039806266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024670872,0.0006109113,0.00040518751,0.00036159524,0.00045961008,0.00048661313,0.0005722686,0.00042651006,0.0019943786],"category_scores_gemma":[0.00055545766,0.00036984376,0.00031712005,0.00030002595,0.0004841877,0.00044907417,0.00070081867,0.00041027967,0.00022617911],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011402405,0.000034308392,0.0015995724,0.00006606334,0.000011561742,0.00029189346,0.00014290257,0.9589874,0.0055721547,0.0015008503,0.00043155538,0.031247761],"study_design_scores_gemma":[0.000014604806,0.00007726009,0.0010048138,0.00001059423,0.000007434144,0.000056243836,0.00017797522,0.993848,0.0023361486,0.0014952797,0.0009623627,0.000009221253],"about_ca_topic_score_codex":0.010700706,"about_ca_topic_score_gemma":0.01659124,"teacher_disagreement_score":0.010700706,"about_ca_system_score_codex":0.00039223203,"about_ca_system_score_gemma":0.0013542584,"threshold_uncertainty_score":0.021276832},"labels":[],"label_agreement":null},{"id":"W4367399935","doi":"10.1061/jcemd4.coeng-12449","title":"BidChain: A Blockchain-Based Decentralized Application for Transparent and Secure Competitive Tendering in Public Construction Projects","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Blockchain Technology Applications and Security","field":"Computer Science","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; Hudbay Minerals (Canada)","funders":"","keywords":"Procurement; Blockchain; Transparency (behavior); Smart contract; Public key infrastructure; Business; Computer security; Process management; Computer science; Public-key cryptography; Marketing","score_opus":0.014452828184137538,"score_gpt":0.224789477833481,"score_spread":0.21033664964934345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367399935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08588401,0.00041317655,0.8665511,0.0006474171,0.00012927243,0.0013125954,0.0006785494,0.027261373,0.017122502],"genre_scores_gemma":[0.7285067,0.0005377439,0.2502596,0.0001536813,0.000046085577,0.00068593054,0.0011811906,0.00079671,0.017832335],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992693,0.00023652372,0.000048234753,0.0000939968,0.0002705068,0.000081376245],"domain_scores_gemma":[0.9992668,0.00026605718,0.00006503444,0.00014919616,0.00013053167,0.00012233174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001309221,0.00033537523,0.0004800954,0.00057403144,0.0008734996,0.0010971836,0.001156239,0.0010571913,0.0070605883],"category_scores_gemma":[0.0021894139,0.00031806718,0.0002605931,0.0006736522,0.00050540065,0.0014990489,0.0021466692,0.00073187676,0.0016406383],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002240936,0.001294258,0.0072211227,0.0011960084,0.00013852461,0.0026977048,0.0021790373,0.24219815,0.079693004,0.066529214,0.03547356,0.55913854],"study_design_scores_gemma":[0.00035842427,0.0002787737,0.0020082842,0.00007392173,0.0000307164,0.00043563382,0.0002224497,0.899152,0.01684924,0.02189063,0.05862045,0.000079476195],"about_ca_topic_score_codex":0.0027739082,"about_ca_topic_score_gemma":0.0030923837,"teacher_disagreement_score":0.0070605883,"about_ca_system_score_codex":0.00055430364,"about_ca_system_score_gemma":0.0015560256,"threshold_uncertainty_score":0.02362001},"labels":[],"label_agreement":null},{"id":"W4375867750","doi":"10.1061/jcemd4.coeng-13427","title":"Functionality as a Key Concept for Integrated Project Planning and Scheduling Methods","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Computer science; Scheduling (production processes); Two-level scheduling; Automated planning and scheduling; Planner; Dynamic priority scheduling; Industrial engineering; Systems engineering; Schedule; Engineering; Operations management; Artificial intelligence","score_opus":0.01921588944281504,"score_gpt":0.28996288417762717,"score_spread":0.2707469947348121,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4375867750","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013202409,0.00031410804,0.9703611,0.0005136505,0.00007063318,0.00020178841,0.00005649452,0.00019005503,0.015089844],"genre_scores_gemma":[0.23708417,0.00041919434,0.7591633,0.00014327015,0.000066542416,0.0005723542,0.00016978674,0.00009716774,0.002284313],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.992277,0.004093615,0.000713132,0.00068375585,0.00192526,0.00030709428],"domain_scores_gemma":[0.99251395,0.0041215164,0.0007920896,0.0010995639,0.0011649504,0.00030791815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073681967,0.00104489,0.00036140755,0.0031568108,0.0011164832,0.003743567,0.001448943,0.0009568941,0.0025270153],"category_scores_gemma":[0.009467451,0.000499051,0.001385379,0.0021122543,0.003912052,0.0051707793,0.0026172642,0.0018368039,0.0005463257],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065846114,0.00010655455,0.0033139554,0.0006222967,0.00007252626,0.0001599555,0.0040636356,0.015117068,0.004983031,0.79035705,0.0011041382,0.18003385],"study_design_scores_gemma":[0.00007547419,0.0008926771,0.0076372665,0.0015920262,0.00025727274,0.001188962,0.004961846,0.13804609,0.014239532,0.6666892,0.16425714,0.00016245575],"about_ca_topic_score_codex":0.0012706601,"about_ca_topic_score_gemma":0.0010156895,"teacher_disagreement_score":0.0073681967,"about_ca_system_score_codex":0.001543331,"about_ca_system_score_gemma":0.0034862908,"threshold_uncertainty_score":0.038967192},"labels":[],"label_agreement":null},{"id":"W4376506236","doi":"10.1061/jcemd4.coeng-13100","title":"Identification and Classification of Physical Fatigue in Construction Workers Using Linear and Nonlinear Heart Rate Variability Measurements","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Heart Rate Variability and Autonomic Control","field":"Medicine","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Detrended fluctuation analysis; Approximate entropy; Sample entropy; Heart rate variability; Correlation dimension; Poincaré plot; Nonlinear system; Artificial intelligence; Frequency domain; Pattern recognition (psychology); Mathematics; Linear discriminant analysis; Statistics; Computer science; Medicine; Heart rate; Fractal dimension; Fractal","score_opus":0.03942482051562823,"score_gpt":0.28895824159555766,"score_spread":0.24953342107992943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376506236","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98322797,0.00032984314,0.015881497,0.00003066214,0.000010785085,0.00003699051,0.000108473825,0.0000326109,0.0003410458],"genre_scores_gemma":[0.9948308,0.00014212099,0.0046891295,0.000011908964,0.0000122820875,0.000031703494,0.00012917946,0.0000024193353,0.00015040945],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996917,0.00008412773,0.000030410116,0.00007783779,0.00008006193,0.00003584267],"domain_scores_gemma":[0.9995079,0.00022367924,0.00012350289,0.000030593026,0.00008606867,0.000028202816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088873296,0.00041176763,0.0003425466,0.0008267128,0.00010953606,0.0003094651,0.00016370694,0.00039802922,0.0003484569],"category_scores_gemma":[0.0018871867,0.000096779266,0.0003542369,0.00033138445,0.00016449919,0.00023244247,0.00029281035,0.00019508823,0.00012696722],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016336094,0.0003839872,0.7283307,0.000296611,0.00021850261,0.00028100662,0.0006476723,0.008911093,0.055445362,0.00013424734,0.0003442712,0.20337303],"study_design_scores_gemma":[0.000030625473,0.00071106094,0.92093337,0.000031882315,0.00007468421,0.0002881763,0.00027215426,0.07441808,0.002828876,0.00019317261,0.00018678383,0.000031180192],"about_ca_topic_score_codex":0.001876306,"about_ca_topic_score_gemma":0.0021616993,"teacher_disagreement_score":0.001876306,"about_ca_system_score_codex":0.00011597794,"about_ca_system_score_gemma":0.00015301719,"threshold_uncertainty_score":0.0047001243},"labels":[],"label_agreement":null},{"id":"W4379419119","doi":"10.1061/jcemd4.coeng-12891","title":"Crane Mat Layout Optimization Based on Agent-Based Greedy and Reinforcement-Learning Approach","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement learning; Modular design; Plan (archaeology); Computer science; Industrial engineering; Engineering; Transport engineering; Artificial intelligence","score_opus":0.006032767202855141,"score_gpt":0.17752665299140344,"score_spread":0.1714938857885483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379419119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04156078,0.00024584922,0.9519189,0.00021336054,0.00003925811,0.000096007665,0.000036647063,0.00045775532,0.0054314733],"genre_scores_gemma":[0.8530863,0.00015380202,0.1425695,0.00012081583,0.0000268658,0.00020082534,0.000070714355,0.000048132533,0.0037232144],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973375,0.00006774302,0.000010505067,0.00005660752,0.00006792553,0.00006342354],"domain_scores_gemma":[0.9995154,0.0002497286,0.000074366195,0.000024641193,0.00009029867,0.00004551957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052629894,0.00073487015,0.0010816441,0.0005067499,0.00039870042,0.00061258173,0.0012890913,0.00093258487,0.0020839432],"category_scores_gemma":[0.001055308,0.0004976094,0.00061323197,0.0003685243,0.0006762784,0.00044432742,0.0007358512,0.00071249827,0.000219549],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016447639,0.000023742243,0.00024410212,0.000017712251,0.000011481217,0.000031804433,0.000013052489,0.98869354,0.0004356798,0.0014909232,0.00021848333,0.0088029895],"study_design_scores_gemma":[0.000004160732,0.000009448867,0.000028862067,0.0000012985818,0.0000022852262,0.000003805499,0.0000023408961,0.99947625,0.00006911247,0.00031403112,0.00008695481,0.0000014179133],"about_ca_topic_score_codex":0.013904438,"about_ca_topic_score_gemma":0.0115250535,"teacher_disagreement_score":0.013904438,"about_ca_system_score_codex":0.00085445144,"about_ca_system_score_gemma":0.0017269161,"threshold_uncertainty_score":0.027647018},"labels":[],"label_agreement":null},{"id":"W4381615821","doi":"10.1061/jcemd4.coeng-13020","title":"Integrating Inverse Photogrammetry and a Deep Learning–Based Point Cloud Segmentation Approach for Automated Generation of BIM Models","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Point cloud; Photogrammetry; Computer science; Segmentation; Artificial intelligence; Point (geometry); Deep learning; Computer vision; Testbed; Data mining; Geometry","score_opus":0.022071474019776775,"score_gpt":0.21085702918876842,"score_spread":0.18878555516899165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381615821","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010205462,0.000073091076,0.9832593,0.000059177753,0.000028266622,0.000062353654,0.00011660978,0.0046768636,0.0015187963],"genre_scores_gemma":[0.23025365,0.00022700713,0.7653375,0.0001488857,0.00002817705,0.00015662005,0.0011726558,0.00029792747,0.0023776067],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921274,0.000057704157,0.000037199767,0.00025041075,0.00032885346,0.00011312891],"domain_scores_gemma":[0.9996549,0.000046029327,0.000042207597,0.000109184766,0.0001208941,0.000026823844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052773993,0.0015468784,0.00097273296,0.0029367509,0.00046626743,0.0010971575,0.0015065438,0.0010471785,0.0027212002],"category_scores_gemma":[0.000982167,0.0009124259,0.0013399605,0.002153452,0.0007094733,0.0016226665,0.0019123245,0.0011574021,0.0022365884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013808564,0.00022132896,0.002902529,0.0001834474,0.00011853824,0.0002528963,0.00026476727,0.16513574,0.073144116,0.0051259585,0.0052945376,0.7472181],"study_design_scores_gemma":[0.000009210883,0.000044370718,0.0014381035,0.000018501001,0.00002224715,0.00012078155,0.00006673996,0.96734244,0.024224373,0.0031498168,0.0035371308,0.000026202653],"about_ca_topic_score_codex":0.006660566,"about_ca_topic_score_gemma":0.012571162,"teacher_disagreement_score":0.006660566,"about_ca_system_score_codex":0.00071784813,"about_ca_system_score_gemma":0.0015387894,"threshold_uncertainty_score":0.013243616},"labels":[],"label_agreement":null},{"id":"W4382400439","doi":"10.1061/jcemd4.coeng-12764","title":"Practitioners’ Concerns about Their Liability toward BIM Collaborative Digital Mockups: Case Study in Civil Engineering","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Liability; CLARITY; Asset (computer security); Context (archaeology); Process (computing); Work (physics); Building information modeling; Exploratory research; Legal liability; Knowledge management; Computer science; Business; Engineering ethics; Engineering; Computer security; Sociology; Operations management; Accounting","score_opus":0.010828764562692262,"score_gpt":0.22624843424984611,"score_spread":0.21541966968715384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382400439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9897376,0.00014326816,0.0064841653,0.0014481911,0.000012085847,0.00016540464,0.000010399026,0.000014121541,0.0019849208],"genre_scores_gemma":[0.9906769,0.00027637332,0.0072692595,0.0005212669,0.000014275372,0.00019063476,0.000013477628,0.000013389845,0.0010243232],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.941057,0.048660465,0.0017696948,0.0018299676,0.0040977155,0.0025851708],"domain_scores_gemma":[0.87289315,0.10331972,0.00825941,0.004307626,0.007211399,0.0040086904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.039088544,0.0007631639,0.0006853075,0.0020228722,0.01393733,0.004053485,0.0029536814,0.008540789,0.0019164243],"category_scores_gemma":[0.08011527,0.0010835418,0.0007106954,0.0017192251,0.010007913,0.0047768652,0.0072579766,0.0044222036,0.0004978077],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010366456,0.0011781725,0.0110796355,0.00026198674,0.000015285566,0.010725932,0.9536486,0.0008843756,0.0021544164,0.0036228134,0.00064781116,0.015677376],"study_design_scores_gemma":[0.00005237526,0.0010447562,0.006407661,0.0003593148,0.000030243233,0.0064094816,0.96635413,0.0025551931,0.0027574897,0.0023969302,0.011540203,0.00009223318],"about_ca_topic_score_codex":0.0044663996,"about_ca_topic_score_gemma":0.008262868,"teacher_disagreement_score":0.039088544,"about_ca_system_score_codex":0.004597993,"about_ca_system_score_gemma":0.0039891866,"threshold_uncertainty_score":0.20672244},"labels":[],"label_agreement":null},{"id":"W4382537193","doi":"10.1061/jcemd4.coeng-13637","title":"Measurement of Information Loss and Transfer Impacts of Technology Systems in Offsite Construction Processes","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Interoperability; Building information modeling; Documentation; Process (computing); Information transfer; Systems engineering; Information system; Risk analysis (engineering); Construction management; Productivity; Engineering; Information technology; Computer science; Construction engineering; Civil engineering; Operations management","score_opus":0.004386788376904425,"score_gpt":0.17144924000667444,"score_spread":0.16706245162977001,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382537193","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9662578,0.0001226915,0.025078114,0.0001283555,0.000007627441,0.00027449045,0.00015115179,0.00006358344,0.00791627],"genre_scores_gemma":[0.99485105,0.00007819912,0.004466173,0.000013509785,0.0000017311944,0.000090886264,0.0000921758,0.000009254083,0.00039688652],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9911184,0.0032557494,0.0004943404,0.00050655485,0.0039435634,0.0006814217],"domain_scores_gemma":[0.96470547,0.024618948,0.004293029,0.0025358987,0.0033715672,0.00047508866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005504487,0.000632869,0.00037262493,0.002641198,0.0008148863,0.0024507712,0.0008126213,0.0010924096,0.0019127933],"category_scores_gemma":[0.023757622,0.00029408638,0.00061846344,0.0027600243,0.0016575411,0.0036053513,0.0025465933,0.0010994567,0.00026354194],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028153185,0.0041133496,0.29897216,0.0016511086,0.00037951977,0.0013487352,0.014815694,0.33069858,0.05174741,0.031784497,0.0010345097,0.26063913],"study_design_scores_gemma":[0.00013261837,0.0069681625,0.4020144,0.00049550243,0.0004698003,0.0009176036,0.024535678,0.36336556,0.173409,0.019766875,0.0076706465,0.00025416556],"about_ca_topic_score_codex":0.0022240577,"about_ca_topic_score_gemma":0.001427893,"teacher_disagreement_score":0.005504487,"about_ca_system_score_codex":0.0027967787,"about_ca_system_score_gemma":0.0013122595,"threshold_uncertainty_score":0.029110849},"labels":[],"label_agreement":null},{"id":"W4384575880","doi":"10.1061/jcemd4.coeng-13298","title":"A Simulation Model to Analyze Different Automation Scenarios in a Mixed-Assembly Manufacturing Line: Timber-Frame Prefabrication Industry","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Université Laval","funders":"","keywords":"Prefabrication; Automation; Frame (networking); Production (economics); Engineering; Manufacturing engineering; Computer science; Systems engineering; Risk analysis (engineering); Industrial engineering; Civil engineering; Business; Mechanical engineering; Economics","score_opus":0.011358872435667623,"score_gpt":0.24157451880471542,"score_spread":0.2302156463690478,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384575880","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7383362,0.0006865637,0.20994611,0.0008968842,0.00015956227,0.00062638556,0.0028365816,0.00064348325,0.045868233],"genre_scores_gemma":[0.96529627,0.00042278643,0.024495637,0.000056970504,0.000014018419,0.00065625046,0.0008979252,0.000032073178,0.00812796],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996432,0.0001531216,0.000015955757,0.000048168295,0.00005059368,0.000088895504],"domain_scores_gemma":[0.99829453,0.0012584644,0.00013225277,0.00004799434,0.000176469,0.00009029578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084646535,0.0011576473,0.00096488034,0.00093630195,0.0008605025,0.0014864433,0.0012372638,0.0022530851,0.00635349],"category_scores_gemma":[0.0017489977,0.0005426074,0.0012973828,0.0010210114,0.0005433557,0.00077805336,0.0007829656,0.0012450437,0.00045833192],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004202649,0.00004598085,0.00072827906,0.000022243308,0.000009799369,0.00003545647,0.000018285,0.997051,0.00023876573,0.0010437405,0.00008599501,0.0006782787],"study_design_scores_gemma":[0.000017209166,0.00004686527,0.00021420757,0.0000062362305,0.000009546106,0.000004971018,0.000029908995,0.9988939,0.00014642962,0.00033246452,0.00029358754,0.0000046762652],"about_ca_topic_score_codex":0.030654388,"about_ca_topic_score_gemma":0.019707702,"teacher_disagreement_score":0.030654388,"about_ca_system_score_codex":0.0017644706,"about_ca_system_score_gemma":0.0020285626,"threshold_uncertainty_score":0.06095195},"labels":[],"label_agreement":null},{"id":"W4385370976","doi":"10.1061/jcemd4.coeng-13433","title":"VR-RET: A Virtual Reality–Based Approach for Real-Time Ergonomics Training on Industrialized Construction Tasks","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Musculoskeletal pain and rehabilitation","field":"Medicine","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Virtual reality; Human factors and ergonomics; Motion capture; Simulation; Work (physics); Engineering; Poison control; Human–computer interaction; Computer science; Artificial intelligence; Medicine; Motion (physics)","score_opus":0.02476466515057185,"score_gpt":0.26356751512390403,"score_spread":0.23880284997333218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385370976","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34242782,0.001316846,0.6467185,0.00016506959,0.0001128381,0.0007575696,0.00024793472,0.0024754973,0.0057780105],"genre_scores_gemma":[0.6563468,0.00084432936,0.33848476,0.00012773935,0.00005681838,0.00050185266,0.00024525356,0.000089871486,0.003302705],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993808,0.00025543454,0.000030101488,0.00010042283,0.00018371065,0.000049404185],"domain_scores_gemma":[0.9996381,0.00016408005,0.0000585984,0.000051840158,0.000050677594,0.00003670014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006943296,0.0006960857,0.00035348223,0.00056122703,0.00014766841,0.00034671125,0.00091503817,0.0005253557,0.0023302885],"category_scores_gemma":[0.0009791054,0.00024410989,0.0005439993,0.00020304871,0.00028826983,0.00029730864,0.000717554,0.0002920737,0.00037966407],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016241345,0.0023539453,0.0036865624,0.0010143114,0.00020755066,0.00038717588,0.0012288307,0.04060811,0.30361933,0.002042506,0.0018992819,0.6413282],"study_design_scores_gemma":[0.0014509867,0.031180397,0.1869311,0.00082403084,0.0014227824,0.0055477777,0.0016681032,0.4186096,0.2737426,0.005164565,0.07242913,0.0010290028],"about_ca_topic_score_codex":0.0014573969,"about_ca_topic_score_gemma":0.0021634593,"teacher_disagreement_score":0.0023302885,"about_ca_system_score_codex":0.00015691562,"about_ca_system_score_gemma":0.0004423146,"threshold_uncertainty_score":0.007795632},"labels":[],"label_agreement":null},{"id":"W4385438341","doi":"10.1061/jcemd4.coeng-12943","title":"Environmental Impact and Cost Assessment for Reusing Waste during End-of-Life Activities on Building Projects","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Demolition; Reuse; Construction waste; Environmental impact assessment; Demolition waste; Greenhouse gas; Embodied energy; Life-cycle assessment; Energy recovery; Excavator; Environmental economics; Waste management; Engineering; Civil engineering; Production (economics); Energy (signal processing)","score_opus":0.008481324876128135,"score_gpt":0.23453299887902115,"score_spread":0.22605167400289303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385438341","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99420834,0.000051237323,0.0034958152,0.000019519457,0.0000020189038,0.000045403965,0.00013705112,0.000015774433,0.0020248536],"genre_scores_gemma":[0.99767333,0.000059654285,0.0017304528,0.000002475534,6.8270936e-7,0.000018283297,0.00011352818,0.0000044440526,0.00039707165],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993051,0.00022976067,0.000026102658,0.000033500306,0.000310646,0.0000948356],"domain_scores_gemma":[0.99930155,0.00033646042,0.00009243173,0.000043372474,0.00018650686,0.00003959472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012951387,0.0006280958,0.00038522738,0.001800542,0.00044423767,0.00082349277,0.0005613284,0.0006435832,0.00089365593],"category_scores_gemma":[0.0014647536,0.00022287788,0.0006451393,0.0014020042,0.00038267986,0.0007097969,0.00047743932,0.00028829733,0.00011703546],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000843304,0.00043508748,0.069535874,0.00011370053,0.00008341706,0.00040540268,0.00009593355,0.8802923,0.014801963,0.0012971135,0.00022413391,0.031871855],"study_design_scores_gemma":[0.00005271441,0.0015925793,0.1124546,0.000029307159,0.00015355414,0.00013584358,0.00077240996,0.8546479,0.02821381,0.000987498,0.000902598,0.000057188],"about_ca_topic_score_codex":0.029851783,"about_ca_topic_score_gemma":0.05144128,"teacher_disagreement_score":0.029851783,"about_ca_system_score_codex":0.0023414942,"about_ca_system_score_gemma":0.0011305468,"threshold_uncertainty_score":0.059356093},"labels":[],"label_agreement":null},{"id":"W4386749591","doi":"10.1061/jcemd4.coeng-13549","title":"Machine Learning–Based Bayesian Framework for Interval Estimate of Unsafe-Event Prediction in Construction","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bayesian inference; Event (particle physics); Machine learning; Computer science; Bayesian probability; Interval (graph theory); Artificial intelligence; Field (mathematics); Inference; Selection (genetic algorithm); Range (aeronautics); Outcome (game theory); Data mining; Risk analysis (engineering); Engineering; Mathematics","score_opus":0.026153683665583266,"score_gpt":0.3929293371537704,"score_spread":0.3667756534881871,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386749591","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005583912,0.0003479077,0.9923649,0.0002289405,0.000022227807,0.00003624497,0.00009933172,0.00011542104,0.0012011674],"genre_scores_gemma":[0.609041,0.0018663516,0.3832193,0.0002471762,0.00036506902,0.000553716,0.000896978,0.00008961127,0.0037209052],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99683726,0.0015494267,0.00017280695,0.000579477,0.000653901,0.00020715485],"domain_scores_gemma":[0.98716843,0.010103302,0.0010265175,0.00033610276,0.0011614935,0.00020411343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008647329,0.0012505233,0.0017812982,0.0026092378,0.0007480123,0.0022078499,0.0031115573,0.0016062732,0.0029036175],"category_scores_gemma":[0.021332009,0.00096536765,0.0012558809,0.0019070639,0.0015361492,0.002656602,0.0014748942,0.0027243735,0.0005567987],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000745256,0.000081346094,0.0027033375,0.00012518346,0.00008041234,0.00013461435,0.00017664794,0.882231,0.0005239719,0.07150955,0.0009798545,0.041379604],"study_design_scores_gemma":[0.000007088779,0.000018892579,0.00031785906,0.000025872001,0.000016874936,0.000020320998,0.00001194758,0.9759413,0.00014424216,0.022981402,0.00049673556,0.000017560147],"about_ca_topic_score_codex":0.013828086,"about_ca_topic_score_gemma":0.010832909,"teacher_disagreement_score":0.013828086,"about_ca_system_score_codex":0.0018178887,"about_ca_system_score_gemma":0.0024884853,"threshold_uncertainty_score":0.04573196},"labels":[],"label_agreement":null},{"id":"W4386976107","doi":"10.1061/jcemd4.coeng-13615","title":"Project Schedule Acceleration Optimization Integrated with Energy Source–Based Assessment of Occupational Health and Safety Risks","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"","keywords":"Schedule; Duration (music); Critical path method; Risk analysis (engineering); Computer science; Project management; Project planning; Operations research; Scheduling (production processes); Project portfolio management; Reliability engineering; Transport engineering; Engineering; Systems engineering; Operations management; Business","score_opus":0.06362666531635958,"score_gpt":0.367985923012557,"score_spread":0.3043592576961974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386976107","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07962279,0.000109407796,0.91746587,0.00007694453,0.000011592009,0.00009816066,0.00007854335,0.0001486814,0.0023880228],"genre_scores_gemma":[0.7700879,0.00018750387,0.22749218,0.000016679858,0.000017336519,0.00018636507,0.0002079483,0.000057710527,0.0017463898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993741,0.00024295152,0.000025570078,0.00008391865,0.00021801973,0.000055477845],"domain_scores_gemma":[0.9992878,0.00033780708,0.00016134538,0.000037872076,0.00013948797,0.000035764282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012456949,0.0008683363,0.00066439883,0.0016866721,0.00026638288,0.00071514456,0.0006046881,0.00039648314,0.0011725303],"category_scores_gemma":[0.0021825419,0.00036288315,0.00065663125,0.0007687514,0.00031667986,0.00067232596,0.00060950965,0.00042951913,0.00011007151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003725015,0.000039442166,0.0014919129,0.00003344774,0.000024002982,0.00001793875,0.000028619901,0.9699402,0.0014982349,0.0030048918,0.00013225319,0.023751853],"study_design_scores_gemma":[0.000003973284,0.000047682934,0.0005883457,0.0000040690984,0.00000930966,0.000007608002,0.000015220424,0.99675363,0.0007450189,0.0015576642,0.00026234996,0.0000050352432],"about_ca_topic_score_codex":0.0056225527,"about_ca_topic_score_gemma":0.004925221,"teacher_disagreement_score":0.0056225527,"about_ca_system_score_codex":0.00085177255,"about_ca_system_score_gemma":0.0018208944,"threshold_uncertainty_score":0.011179686},"labels":[],"label_agreement":null},{"id":"W4387452690","doi":"10.1061/jcemd4.coeng-13672","title":"Fuzzy Agent–Based Modeling of Competency and Performance Measures in Construction","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Computer science; Artificial intelligence","score_opus":0.04613004933097436,"score_gpt":0.2791773188368558,"score_spread":0.23304726950588145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387452690","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17560934,0.00045224355,0.79409724,0.0008950013,0.000061856495,0.00018132567,0.00029291675,0.00017469145,0.028235385],"genre_scores_gemma":[0.94113475,0.0002631575,0.053037748,0.00004237348,0.000015191011,0.00019873188,0.000112274414,0.000011749522,0.0051840036],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995902,0.00016397395,0.000019963145,0.00007065943,0.00009947201,0.000055602726],"domain_scores_gemma":[0.99936587,0.000350612,0.000104280945,0.000020618629,0.00011380073,0.000044909953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091969303,0.0006253199,0.00048672422,0.00068809895,0.0006020281,0.0014592863,0.0012377299,0.0011070769,0.0018649483],"category_scores_gemma":[0.0018383879,0.00032302787,0.0006010861,0.00064318767,0.0006616363,0.0010038457,0.0007228808,0.0007915213,0.0001617909],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018747418,0.000028461378,0.00097072776,0.0000144444475,0.000015602598,0.000058838294,0.00008216533,0.97780186,0.0003734994,0.017324768,0.00016224005,0.0031485853],"study_design_scores_gemma":[0.0000028667228,0.0000065455874,0.00013556377,0.0000027551841,0.0000028725137,0.0000037532623,0.000011991898,0.99801695,0.00004661201,0.0015997152,0.00016752254,0.0000028789614],"about_ca_topic_score_codex":0.028740635,"about_ca_topic_score_gemma":0.018021017,"teacher_disagreement_score":0.028740635,"about_ca_system_score_codex":0.0020300257,"about_ca_system_score_gemma":0.0014554156,"threshold_uncertainty_score":0.057146728},"labels":[],"label_agreement":null},{"id":"W4387511328","doi":"10.1061/jcemd4.coeng-13019","title":"Detecting Information Bottlenecks in Architecture Engineering Construction Projects for Integrative Project Management","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Architecture; Engineering management; Systems engineering; Construction engineering; Engineering; Project management; Process management; Knowledge management; Computer science; Software engineering; Geography","score_opus":0.005720759321602127,"score_gpt":0.19959399173186743,"score_spread":0.1938732324102653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387511328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4348429,0.00064228027,0.55551803,0.0009839355,0.000051873623,0.0005935841,0.0008307937,0.0023434563,0.0041931276],"genre_scores_gemma":[0.8853885,0.00020774636,0.11264413,0.000039099883,0.000010041153,0.00023820758,0.0007313285,0.00008885705,0.00065202214],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9913338,0.003952068,0.00074769114,0.0016521267,0.0016625947,0.00065169984],"domain_scores_gemma":[0.9531479,0.028228333,0.007695214,0.0035285645,0.0058341706,0.0015658656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012908504,0.0015738134,0.0013784578,0.005383095,0.0011121925,0.0056026992,0.002067241,0.0018971665,0.0020612373],"category_scores_gemma":[0.052582458,0.0012071668,0.0011201389,0.0034080807,0.0011803646,0.007131139,0.0029759293,0.0016488063,0.0005679444],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007157946,0.0008909601,0.2459087,0.0009330631,0.00030573353,0.00055493816,0.0046786773,0.52911663,0.0068810387,0.016966743,0.0034901616,0.18955755],"study_design_scores_gemma":[0.000027017259,0.00020058909,0.022611154,0.00013675442,0.000085531974,0.00011952858,0.0011228082,0.96255565,0.0027082695,0.008331244,0.0020409129,0.00006054942],"about_ca_topic_score_codex":0.018763248,"about_ca_topic_score_gemma":0.014251985,"teacher_disagreement_score":0.018763248,"about_ca_system_score_codex":0.0032855587,"about_ca_system_score_gemma":0.0047704503,"threshold_uncertainty_score":0.068267524},"labels":[],"label_agreement":null},{"id":"W4387589586","doi":"10.1061/jcemd4.coeng-13690","title":"A Data-Driven Approach for Deploying Safety Policies for Schedule Planning in Industrial Construction Projects: A Case Study","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Calgary; University of Alberta","funders":"","keywords":"Schedule; Business; Computer science; Process management; Construction engineering; Engineering; Engineering management; Risk analysis (engineering)","score_opus":0.23449554566319916,"score_gpt":0.4615087399588229,"score_spread":0.22701319429562375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387589586","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6268738,0.00033800502,0.3579967,0.0016670637,0.000066491,0.0012605626,0.0031188112,0.0013590623,0.007319588],"genre_scores_gemma":[0.79357564,0.00020089153,0.2038247,0.000052025094,0.000011754078,0.00033088546,0.001153535,0.000049022336,0.00080159947],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9983559,0.0007489954,0.000102266866,0.0002383388,0.000427905,0.00012665348],"domain_scores_gemma":[0.99335456,0.0046211374,0.00039702508,0.00046568684,0.00092408824,0.00023740141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037334757,0.00078157237,0.00045366527,0.0016200105,0.0007990215,0.00149936,0.0017634103,0.0010549276,0.001191445],"category_scores_gemma":[0.0077348426,0.00061297533,0.0007412607,0.0017666818,0.0007298764,0.0012511295,0.0008740353,0.0011438129,0.00013149253],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011031451,0.00030551502,0.010147401,0.00012865686,0.000041513777,0.0004213213,0.00036371,0.9539792,0.001139722,0.005123154,0.00078637025,0.02745304],"study_design_scores_gemma":[0.000019942074,0.00005837326,0.0015191683,0.000018444214,0.000013092284,0.0000372572,0.00024770186,0.9937283,0.0011187217,0.0016912995,0.0015279822,0.000019840056],"about_ca_topic_score_codex":0.077623546,"about_ca_topic_score_gemma":0.10294241,"teacher_disagreement_score":0.077623546,"about_ca_system_score_codex":0.004057148,"about_ca_system_score_gemma":0.0056789964,"threshold_uncertainty_score":0.15434343},"labels":[],"label_agreement":null},{"id":"W4391002360","doi":"10.1061/jcemd4.coeng-14348","title":"Integrating Virtual Reality and Consensus Models for Streamlined Built Environment Design Collaboration","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Virtual Reality Applications and Impacts","field":"Computer Science","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"CLARITY; Computer science; Human–computer interaction; Process (computing); Knowledge management; Negotiation; Virtual reality; Process management; Engineering","score_opus":0.02207846411184113,"score_gpt":0.2516459450350435,"score_spread":0.22956748092320237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391002360","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008087133,0.00013427013,0.9859737,0.00030986816,0.00004312068,0.00008851291,0.000021185744,0.00029516692,0.0050470936],"genre_scores_gemma":[0.47081706,0.00044752946,0.5242092,0.00016107311,0.000054728313,0.00043373147,0.0001241033,0.00013859387,0.0036139966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99069947,0.005173075,0.00050888804,0.0012199769,0.001996396,0.00040217795],"domain_scores_gemma":[0.99015105,0.0055405963,0.0011512956,0.0013131299,0.001410983,0.00043289087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072287484,0.0011504397,0.00087742525,0.0019955263,0.0013930206,0.004005369,0.002478723,0.0026327919,0.004523559],"category_scores_gemma":[0.016471775,0.000889994,0.0018033165,0.0011334055,0.002135213,0.0061630397,0.0053308904,0.0021413758,0.0008818036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022416454,0.00026034884,0.0018358061,0.0006024585,0.00014349788,0.00052121264,0.0053699636,0.5035079,0.009628538,0.33771312,0.002168712,0.13802418],"study_design_scores_gemma":[0.00007468411,0.00019900802,0.00039477952,0.000096966105,0.00006855301,0.00015886378,0.000955315,0.8753787,0.0032860744,0.10782125,0.011474659,0.00009117188],"about_ca_topic_score_codex":0.0030319977,"about_ca_topic_score_gemma":0.0023959342,"teacher_disagreement_score":0.0072287484,"about_ca_system_score_codex":0.0015276617,"about_ca_system_score_gemma":0.002459887,"threshold_uncertainty_score":0.038229704},"labels":[],"label_agreement":null},{"id":"W4391707230","doi":"10.1061/jcemd4.coeng-13915","title":"Duration Estimation of a Heavy Industrial Scaffolding Project: A Case Study","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Duration (music); Estimation; Scaffold; Statistics; Mathematics; Engineering; Art; Biomedical engineering; Systems engineering","score_opus":0.013689525768489887,"score_gpt":0.23306286990129885,"score_spread":0.21937334413280896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391707230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96718484,0.00014451431,0.030311532,0.00012562674,0.000009291248,0.00012679656,0.0005860878,0.0001172483,0.0013939439],"genre_scores_gemma":[0.9655289,0.00019071325,0.032118477,0.000012151715,0.00001167258,0.00012205228,0.0007343587,0.000035412933,0.0012462084],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985152,0.00054265466,0.00012599489,0.00028369107,0.00041826782,0.00011428701],"domain_scores_gemma":[0.9894462,0.006818761,0.0012331795,0.0006669853,0.0014790322,0.0003558422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026684783,0.00063108915,0.0004964371,0.0020647882,0.00059716374,0.0008099484,0.0012423369,0.00082721206,0.0012314228],"category_scores_gemma":[0.008614985,0.0003198543,0.00053598714,0.0023239108,0.0004672757,0.000809327,0.0006248498,0.0006731132,0.00030763453],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009361315,0.0021310716,0.3852423,0.0011338011,0.00021813763,0.008361931,0.009145874,0.2850019,0.01407947,0.0041517993,0.004183341,0.28541422],"study_design_scores_gemma":[0.000069463305,0.0021766904,0.27490255,0.00023455382,0.00015752621,0.0020679228,0.011510806,0.6809951,0.014231764,0.0033213806,0.01011485,0.00021738038],"about_ca_topic_score_codex":0.013457618,"about_ca_topic_score_gemma":0.019921657,"teacher_disagreement_score":0.013457618,"about_ca_system_score_codex":0.0011572229,"about_ca_system_score_gemma":0.0010941166,"threshold_uncertainty_score":0.026758611},"labels":[],"label_agreement":null},{"id":"W4395106668","doi":"10.1061/jcemd4.coeng-13811","title":"MOCAP and AI-Based Automated Physical Demand Analysis for Workplace Safety","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Human-Automation Interaction and Safety","field":"Psychology","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workplace safety; Psychology; Applied psychology; Computer science; Occupational safety and health; Forensic engineering; Engineering; Medicine","score_opus":0.00695328551402168,"score_gpt":0.3030343925250041,"score_spread":0.2960811070109824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395106668","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06947514,0.0005330896,0.8934944,0.00021118684,0.00016187657,0.00085638335,0.0038813083,0.023229226,0.008157438],"genre_scores_gemma":[0.5125989,0.0005043825,0.47036165,0.00033420953,0.00009279132,0.0016470768,0.0052291458,0.00045264064,0.008779259],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993012,0.000120543424,0.000056669272,0.00016441957,0.0003041011,0.000053024516],"domain_scores_gemma":[0.9990441,0.0003809352,0.000096796764,0.00006960855,0.00034774284,0.00006077657],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051074184,0.0012258529,0.0005966898,0.0018942353,0.00028383627,0.00076699525,0.0010533199,0.00070136384,0.0040539145],"category_scores_gemma":[0.0017754887,0.00038102648,0.0007759982,0.0007962681,0.00020316143,0.00058974844,0.0008980711,0.0005513416,0.0018315737],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008072998,0.0011756674,0.015841996,0.0011131223,0.00028638288,0.0004650839,0.00045694865,0.094132334,0.04788951,0.0020993995,0.014107611,0.8216246],"study_design_scores_gemma":[0.000071766175,0.00039751778,0.036021024,0.00016456137,0.00009555505,0.00044527138,0.0002662722,0.9204334,0.025237285,0.0024595826,0.014266761,0.00014105135],"about_ca_topic_score_codex":0.009546406,"about_ca_topic_score_gemma":0.010729953,"teacher_disagreement_score":0.009546406,"about_ca_system_score_codex":0.0005310339,"about_ca_system_score_gemma":0.0009017955,"threshold_uncertainty_score":0.018981695},"labels":[],"label_agreement":null},{"id":"W4396617730","doi":"10.1061/jcemd4.coeng-14430","title":"Integrating the Last Planner System and Immersive Virtual Reality: Exploring the Social Mechanisms Produced by Using LPS in Projects","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Virtual Reality Applications and Impacts","field":"Computer Science","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Virtual reality; Human–computer interaction; Computer science; Multimedia; Artificial intelligence","score_opus":0.02629907978595323,"score_gpt":0.24628391211544795,"score_spread":0.21998483232949473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396617730","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90921545,0.00023452358,0.07927075,0.00041068613,0.000024539648,0.0002902538,0.000066369175,0.00034251634,0.010145066],"genre_scores_gemma":[0.9443353,0.00021483694,0.053861067,0.00007934736,0.000008103593,0.0002457913,0.000052151187,0.00004456318,0.0011587152],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.996212,0.0028989015,0.000069256166,0.00022547822,0.00035147445,0.00024286208],"domain_scores_gemma":[0.9964651,0.0025755856,0.00029299577,0.0002866259,0.0001771427,0.0002024923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033048543,0.00076332217,0.00031269153,0.0010792973,0.0008965621,0.0025213605,0.0011822731,0.0009509728,0.0017906193],"category_scores_gemma":[0.0055541983,0.0005509195,0.000553502,0.0005517369,0.0026950622,0.0026919574,0.0040996354,0.00073758455,0.00024724347],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012768339,0.0041328883,0.05460986,0.0026847618,0.00028414963,0.004196703,0.32556158,0.0358063,0.10571099,0.04205447,0.0035565754,0.42012486],"study_design_scores_gemma":[0.00084949966,0.016057823,0.18521771,0.002414407,0.0008238386,0.004291438,0.32423967,0.20858952,0.072051175,0.04270361,0.14150885,0.0012524172],"about_ca_topic_score_codex":0.0015300033,"about_ca_topic_score_gemma":0.0024837754,"teacher_disagreement_score":0.0033048543,"about_ca_system_score_codex":0.00069987983,"about_ca_system_score_gemma":0.0011271467,"threshold_uncertainty_score":0.01747793},"labels":[],"label_agreement":null},{"id":"W4396758773","doi":"10.1061/jcemd4.coeng-14130","title":"Artificial Cognition to Predict and Explain the Potential Unsafe Behaviors of Construction Workers","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Cognition; Forensic engineering; Psychology; Cognitive psychology; Risk analysis (engineering); Computer science; Business; Engineering","score_opus":0.02126529712442747,"score_gpt":0.35281338553008584,"score_spread":0.33154808840565836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396758773","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9597885,0.00017966537,0.037545744,0.00021534896,0.000017458053,0.00007981351,0.00007987298,0.00009616519,0.0019973824],"genre_scores_gemma":[0.9914956,0.00006155407,0.008172933,0.000034353998,0.0000038875364,0.000028831497,0.000055497047,0.0000026979797,0.00014463175],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993486,0.0002787702,0.00004283004,0.00009954551,0.00016290601,0.000067359906],"domain_scores_gemma":[0.99672323,0.0019875881,0.0005645383,0.00020093596,0.0004183219,0.000105350155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018020535,0.00055565947,0.0002493547,0.0011868237,0.00029503473,0.00089369377,0.00032032453,0.00052955264,0.00081714446],"category_scores_gemma":[0.0069178585,0.00016325753,0.000763141,0.00042663308,0.0005569312,0.0007738129,0.0005104625,0.0005899649,0.00012421553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042325395,0.001452173,0.73514766,0.00034277604,0.0004198545,0.000177964,0.0025426913,0.10183341,0.0039726524,0.006050556,0.0009450817,0.14669192],"study_design_scores_gemma":[0.00005043036,0.0006816876,0.38606632,0.00013307072,0.0002520155,0.00011818151,0.001254959,0.5907378,0.0023824344,0.016868183,0.0013678013,0.00008707521],"about_ca_topic_score_codex":0.007116858,"about_ca_topic_score_gemma":0.007530733,"teacher_disagreement_score":0.007116858,"about_ca_system_score_codex":0.0009119371,"about_ca_system_score_gemma":0.001052697,"threshold_uncertainty_score":0.014150858},"labels":[],"label_agreement":null},{"id":"W4398252220","doi":"10.1061/jcemd4.coeng-14527","title":"Determining Factors Influencing BIM Adoption: A Competency-Driven Approach","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Process management; Building information modeling; Business; Knowledge management; Systems engineering; Computer science; Engineering; Operations management","score_opus":0.006709873202250552,"score_gpt":0.18520324016720616,"score_spread":0.1784933669649556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398252220","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99358857,0.000035679815,0.0037034012,0.00018426792,0.0000023303535,0.00035927212,0.00012324881,0.00000798285,0.0019952103],"genre_scores_gemma":[0.99372077,0.000035222438,0.0056096753,0.00003637179,0.0000013936312,0.00022433426,0.00015348992,0.0000034114005,0.00021538697],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99508166,0.0021497624,0.0003256843,0.00039221536,0.0014275098,0.0006231094],"domain_scores_gemma":[0.98119843,0.010303631,0.0024659266,0.00060107687,0.004430138,0.0010007529],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075093545,0.00047156285,0.00035101184,0.0059429165,0.0013674052,0.0021546306,0.0010507266,0.00059710315,0.001571576],"category_scores_gemma":[0.02571566,0.0002994627,0.00077197264,0.003122538,0.0011836557,0.0015271599,0.0023087854,0.0010354152,0.00019936914],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004530412,0.00048354774,0.95770097,0.00008890416,0.000055520897,0.00015552877,0.010965715,0.0011426865,0.0005281902,0.0018888765,0.0002567155,0.026687916],"study_design_scores_gemma":[0.00001899637,0.00028365917,0.919678,0.000168151,0.000050077128,0.00019762511,0.04350204,0.030470405,0.0011539883,0.0026422108,0.0017827987,0.000052124342],"about_ca_topic_score_codex":0.05626733,"about_ca_topic_score_gemma":0.07360632,"teacher_disagreement_score":0.05626733,"about_ca_system_score_codex":0.006181675,"about_ca_system_score_gemma":0.0094941985,"threshold_uncertainty_score":0.11187965},"labels":[],"label_agreement":null},{"id":"W4398775382","doi":"10.1061/jcemd4.coeng-14227","title":"Sustainability in Prefabricated Construction: Enhancing Multicriteria Analysis and Prediction Using Machine Learning","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Sustainability; Computer science; Machine learning; Engineering; Artificial intelligence; Architectural engineering; Construction engineering; Ecology","score_opus":0.003752955277940804,"score_gpt":0.20285573293684428,"score_spread":0.19910277765890347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398775382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4887808,0.00030348013,0.50593686,0.00035546822,0.000033811404,0.00016966333,0.00018956442,0.0005001839,0.0037301222],"genre_scores_gemma":[0.93449163,0.0001285454,0.064652726,0.000021851582,0.000010033803,0.0000643194,0.00018012279,0.000026767448,0.0004240209],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837565,0.00063933973,0.00009836154,0.0003105972,0.00042239946,0.0001536386],"domain_scores_gemma":[0.9970927,0.0014996687,0.0005356589,0.0002226373,0.0005579786,0.00009131564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003466412,0.0010275318,0.0009765625,0.0031099322,0.0005316928,0.0016984951,0.0008090213,0.0009257236,0.001177432],"category_scores_gemma":[0.006778783,0.00047758906,0.0014728856,0.002182001,0.00057350897,0.0019899113,0.0013900601,0.0009942316,0.00018548396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000688001,0.00016325265,0.04056134,0.00007333084,0.000099347846,0.00010593613,0.0001754175,0.8821381,0.0013818857,0.0021142024,0.00031510956,0.07280328],"study_design_scores_gemma":[0.0000025926847,0.0000355007,0.00546662,0.000012638804,0.000012799671,0.000014288627,0.00007283223,0.9919978,0.00045740922,0.0017081632,0.00020760161,0.000011761409],"about_ca_topic_score_codex":0.011885927,"about_ca_topic_score_gemma":0.014117342,"teacher_disagreement_score":0.011885927,"about_ca_system_score_codex":0.00139744,"about_ca_system_score_gemma":0.001712868,"threshold_uncertainty_score":0.02363354},"labels":[],"label_agreement":null},{"id":"W4399461117","doi":"10.1061/jcemd4.coeng-14458","title":"Crane Signalman Hand-Signal Classification Framework Using Sensor-Based Smart Construction Glove and Machine-Learning Algorithms","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Hand Gesture Recognition Systems","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Artificial intelligence; SIGNAL (programming language); Machine learning; Wired glove; Algorithm; Programming language","score_opus":0.0174413775954931,"score_gpt":0.2301200144249506,"score_spread":0.21267863682945748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399461117","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040718064,0.0011344372,0.9490514,0.00015682554,0.000096687836,0.00014616716,0.00031195773,0.005863872,0.0025206492],"genre_scores_gemma":[0.6105232,0.0012017392,0.369663,0.00028945663,0.00014368059,0.00038477805,0.002082962,0.00020147272,0.015509693],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996425,0.00002974122,0.000021412445,0.00014338728,0.00010458632,0.00005832658],"domain_scores_gemma":[0.99980396,0.0000343716,0.000029197823,0.000022432547,0.000095990494,0.000014083466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042730465,0.0011188202,0.0009722354,0.0013323545,0.0002707085,0.00078686845,0.0012020894,0.0009769701,0.002388143],"category_scores_gemma":[0.00061043963,0.00033546812,0.0010153301,0.0007523463,0.00030118582,0.0008357721,0.0005618377,0.00081101427,0.0012437007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022880206,0.00021526439,0.0030262147,0.00018124779,0.00012439728,0.00028024087,0.00007255615,0.1477315,0.025621392,0.0021241114,0.004245203,0.816149],"study_design_scores_gemma":[0.000005457752,0.00006187632,0.0015223303,0.000015243305,0.00001932859,0.000059831087,0.000018920626,0.9907444,0.005467213,0.00072716933,0.0013440925,0.000014142811],"about_ca_topic_score_codex":0.01683304,"about_ca_topic_score_gemma":0.015729224,"teacher_disagreement_score":0.01683304,"about_ca_system_score_codex":0.0006876257,"about_ca_system_score_gemma":0.00090425333,"threshold_uncertainty_score":0.033470094},"labels":[],"label_agreement":null},{"id":"W4399550361","doi":"10.1061/jcemd4.coeng-14821","title":"Mitigating Project Schedule Risks by Identifying Subcritical Paths and Variance-Critical Activities","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Government of Alberta","funders":"","keywords":"Schedule; Variance (accounting); Critical path method; Computer science; Risk analysis (engineering); Operations research; Environmental science; Engineering; Business; Systems engineering; Accounting","score_opus":0.05827528747021198,"score_gpt":0.370713419999639,"score_spread":0.31243813252942704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399550361","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07647622,0.0005358625,0.91570085,0.0003497975,0.000022404562,0.00023814202,0.000060342514,0.00018859438,0.0064277356],"genre_scores_gemma":[0.75134426,0.0008659963,0.24583225,0.000045472385,0.000022455166,0.0003218705,0.00010112214,0.000065651126,0.0014008417],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99522996,0.0019965973,0.00020582325,0.0005016636,0.0018265223,0.00023946058],"domain_scores_gemma":[0.9758959,0.013341852,0.0053872857,0.0011089956,0.003898765,0.00036724206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058734207,0.0009413541,0.0006043205,0.004051143,0.00085120177,0.0020144745,0.0010315389,0.00056793296,0.0014944588],"category_scores_gemma":[0.029541424,0.00048605315,0.0007111873,0.0021370659,0.0012819177,0.003221714,0.0021754298,0.0011886837,0.00015078479],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020816867,0.0001611783,0.030478334,0.0008146783,0.00014560079,0.00033838156,0.001777135,0.2979381,0.008686236,0.21997555,0.0016135416,0.43786308],"study_design_scores_gemma":[0.000044587916,0.000550822,0.014263881,0.0004345076,0.00023499015,0.0005210015,0.0019109184,0.698883,0.015711756,0.25213844,0.015141825,0.00016423067],"about_ca_topic_score_codex":0.0034849904,"about_ca_topic_score_gemma":0.004671732,"teacher_disagreement_score":0.0058734207,"about_ca_system_score_codex":0.0019913286,"about_ca_system_score_gemma":0.007407406,"threshold_uncertainty_score":0.031062007},"labels":[],"label_agreement":null},{"id":"W4399639892","doi":"10.1061/jcemd4.coeng-15115","title":"Automated Detection and Segmentation of Mechanical, Electrical, and Plumbing Components in Indoor Environments by Using the YOLACT++ Architecture","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Industrial Vision Systems and Defect Detection","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Architecture; Computer science; Segmentation; Artificial intelligence; Geography","score_opus":0.008282077559180461,"score_gpt":0.20361752804022065,"score_spread":0.1953354504810402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399639892","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14748335,0.0007418398,0.8306863,0.00029042485,0.000116261595,0.0001425641,0.0015006778,0.012619482,0.006419161],"genre_scores_gemma":[0.4880381,0.0005680164,0.49551147,0.00034352147,0.00003097231,0.00015873127,0.0046682623,0.00048599616,0.010195018],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998098,0.000013728366,0.000005846012,0.00008329522,0.000049365095,0.000038030114],"domain_scores_gemma":[0.99990666,0.000013626306,0.000014019917,0.000018752566,0.00003413287,0.000012746023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018521074,0.0011073258,0.0005004148,0.000868144,0.00021529381,0.0007636568,0.0011420633,0.00062376156,0.0020248813],"category_scores_gemma":[0.00036268306,0.00047932373,0.0006385908,0.0004605328,0.00030526277,0.0006498341,0.00096419937,0.0005581854,0.0015060481],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038522712,0.00023912545,0.01097902,0.0003147105,0.00012896012,0.00034170365,0.00017614475,0.11520206,0.13358898,0.0026867334,0.014854188,0.7211031],"study_design_scores_gemma":[0.000011034815,0.00010932638,0.005575653,0.000032737662,0.00003814947,0.00017783762,0.00006919211,0.9455674,0.041005284,0.001176116,0.0062077194,0.000029618663],"about_ca_topic_score_codex":0.006712636,"about_ca_topic_score_gemma":0.01854643,"teacher_disagreement_score":0.006712636,"about_ca_system_score_codex":0.0004680025,"about_ca_system_score_gemma":0.0007476424,"threshold_uncertainty_score":0.013347149},"labels":[],"label_agreement":null},{"id":"W4401050742","doi":"10.1061/jcemd4.coeng-15064","title":"Understanding Social Interaction and Physiological Patterns in Nonlean and Last Planner System–Based Project Teams: A Comparative Study Using Immersive Virtual Reality","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Team Dynamics and Performance","field":"Psychology","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Virtual reality; Human–computer interaction; Planner; Computer science; Artificial intelligence","score_opus":0.10474287580038436,"score_gpt":0.35020060006029535,"score_spread":0.245457724259911,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401050742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9992095,0.000034042616,0.00048172454,0.000012812389,0.000001964214,0.000016700757,0.000014034439,0.0000021608087,0.00022701475],"genre_scores_gemma":[0.9985261,0.0000902222,0.0009374032,0.00002448104,0.0000055681667,0.00007220316,0.000043626234,0.0000035311696,0.00029671352],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987112,0.00065053935,0.00007294083,0.00020775618,0.0001640247,0.00019347745],"domain_scores_gemma":[0.9975414,0.0010719838,0.00048324253,0.00009574185,0.00033213434,0.0004755065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014915308,0.00037877346,0.00039645893,0.0009129016,0.0006451525,0.0011358232,0.0003953863,0.00054961274,0.0012953657],"category_scores_gemma":[0.0036208422,0.00030160445,0.00047776732,0.00034391848,0.00073246355,0.000768502,0.0012909406,0.0004826024,0.00018452574],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018544722,0.004485992,0.4262178,0.0008760449,0.00034680165,0.0036598532,0.40834123,0.0009728324,0.057146326,0.00039392893,0.0006205504,0.09508421],"study_design_scores_gemma":[0.000070799695,0.0048151943,0.80841774,0.000105504914,0.000116888026,0.001129436,0.17719957,0.0018101409,0.0030457743,0.00026515892,0.002915202,0.00010860566],"about_ca_topic_score_codex":0.0015016062,"about_ca_topic_score_gemma":0.0027058807,"teacher_disagreement_score":0.0015016062,"about_ca_system_score_codex":0.0002887105,"about_ca_system_score_gemma":0.00041015568,"threshold_uncertainty_score":0.007888079},"labels":[],"label_agreement":null},{"id":"W4401054140","doi":"10.1061/jcemd4.coeng-14764","title":"Ontology-Based Design Features for Representing Constructability in Architectural Design: Toward BIM in Off-Site Construction","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constructability; Ontology; Construction engineering; Building information modeling; Engineering; Computer science; Architectural engineering; Systems engineering","score_opus":0.013213346052477279,"score_gpt":0.22449650179262517,"score_spread":0.2112831557401479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401054140","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089340694,0.00028827047,0.8803248,0.0013878042,0.000044003616,0.00047184865,0.00021916616,0.00018505908,0.027738413],"genre_scores_gemma":[0.4291413,0.00029991884,0.5674175,0.00012285929,0.000012238163,0.00056693517,0.00027710196,0.000068428526,0.002093724],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9945911,0.0029490066,0.0003711558,0.0003711742,0.001448446,0.00026912818],"domain_scores_gemma":[0.99517256,0.0019902205,0.0007544136,0.0010264624,0.00090785726,0.00014847072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067826044,0.00068956194,0.0003938877,0.004383508,0.001930881,0.0051904516,0.0015380937,0.0013907492,0.0011172248],"category_scores_gemma":[0.010052445,0.00055383524,0.0011933834,0.0041418537,0.00560453,0.0078274235,0.0030166411,0.0017716374,0.00023589795],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008353551,0.00026767765,0.0101567395,0.0004220774,0.000059828206,0.0006510385,0.044705365,0.015397878,0.008460226,0.75739664,0.0021372673,0.16026166],"study_design_scores_gemma":[0.0000639766,0.0002636732,0.017710552,0.0011751639,0.00031875534,0.0019315751,0.074722774,0.14274032,0.014882224,0.49961644,0.24635336,0.00022125215],"about_ca_topic_score_codex":0.0078100925,"about_ca_topic_score_gemma":0.0125686,"teacher_disagreement_score":0.0078100925,"about_ca_system_score_codex":0.00351383,"about_ca_system_score_gemma":0.0052627963,"threshold_uncertainty_score":0.035870254},"labels":[],"label_agreement":null},{"id":"W4401769740","doi":"10.1061/jcemd4.coeng-14884","title":"Optimizing Construction Work–Rest Schedules and Worker Reassignment Utilizing Wristband Physiological Data","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rest (music); Work (physics); Computer science; Engineering; Medicine; Mechanical engineering","score_opus":0.08690539863906778,"score_gpt":0.39687652523805705,"score_spread":0.3099711265989893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401769740","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29210755,0.00023593046,0.70276177,0.0002646033,0.00003064352,0.00035115203,0.00015668257,0.0002781547,0.0038135846],"genre_scores_gemma":[0.9218298,0.000115930736,0.07613899,0.000033499808,0.000007840821,0.00024971567,0.00016299954,0.000035438843,0.0014258105],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993761,0.00021218538,0.000030182122,0.00013519118,0.00012681953,0.00011950816],"domain_scores_gemma":[0.9993888,0.0002506274,0.00014350285,0.000051922216,0.0001033572,0.000061594095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015850202,0.00089757843,0.0005615245,0.000698486,0.00041862228,0.0007543022,0.0007281593,0.0006156036,0.0010387617],"category_scores_gemma":[0.0028244602,0.00047485903,0.00048419417,0.00039883063,0.00032571022,0.0006787216,0.00069517945,0.00056600187,0.00021210448],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002398915,0.00036823214,0.0044786525,0.000103458035,0.000039196253,0.00004054161,0.00015454018,0.93692,0.0075712926,0.001446077,0.00044607258,0.048192095],"study_design_scores_gemma":[0.000038225593,0.00071591185,0.0069856485,0.000018359196,0.000036779667,0.00001764718,0.00021958428,0.9867019,0.0029123113,0.0015118904,0.0008160355,0.000025761361],"about_ca_topic_score_codex":0.008997006,"about_ca_topic_score_gemma":0.012140186,"teacher_disagreement_score":0.008997006,"about_ca_system_score_codex":0.00074576424,"about_ca_system_score_gemma":0.0022941402,"threshold_uncertainty_score":0.017889261},"labels":[],"label_agreement":null},{"id":"W4401951023","doi":"10.1061/jcemd4.coeng-14727","title":"Process Mining, Modeling, and Management in Construction: A Critical Review of Three Decades of Research Coupled with a Current Industry Perspective","year":2024,"lang":"en","type":"review","venue":"Journal of Construction Engineering and Management","topic":"Business Process Modeling and Analysis","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Perspective (graphical); Process (computing); Current (fluid); Engineering; Management science; Process management; Computer science; Construction engineering; Engineering ethics; Artificial intelligence","score_opus":0.0709662435663759,"score_gpt":0.37190097294399815,"score_spread":0.3009347293776222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401951023","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00038982026,0.9920989,0.003787579,0.0022238377,0.00028414011,0.000015663709,0.000025877405,0.000020524118,0.0011536921],"genre_scores_gemma":[0.0044793687,0.99046856,0.00359067,0.0005877572,0.00052518665,0.000026180904,0.00005066402,0.000011430708,0.00026012352],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99510443,0.0014528899,0.00083246303,0.00056353805,0.0018707016,0.00017595223],"domain_scores_gemma":[0.9770429,0.018187301,0.0013038422,0.0004388132,0.0028028672,0.00022422135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069305534,0.0012513573,0.001710949,0.0104310885,0.0010650662,0.0051827775,0.001966406,0.003136663,0.0015662146],"category_scores_gemma":[0.010664382,0.0008967813,0.0015968758,0.015156116,0.0035950458,0.0077244854,0.0016813955,0.0034007276,0.000718613],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055880075,0.00013394325,0.0019825874,0.04519775,0.00018458857,0.00029627813,0.001907919,0.003312582,0.000779045,0.057013795,0.023441538,0.86569405],"study_design_scores_gemma":[0.000012584818,0.00014286311,0.0041247504,0.049785435,0.0003509547,0.0012072937,0.0028147986,0.0031198887,0.0010659726,0.036444284,0.9008117,0.00011945917],"about_ca_topic_score_codex":0.005438419,"about_ca_topic_score_gemma":0.006480734,"teacher_disagreement_score":0.0104310885,"about_ca_system_score_codex":0.003096888,"about_ca_system_score_gemma":0.007099745,"threshold_uncertainty_score":0.036652744},"labels":[],"label_agreement":null},{"id":"W4402148723","doi":"10.1061/jcemd4.coeng-14837","title":"Critical Review of Virtual Reality Applications in Offsite Construction Research","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Virtual reality; Computer science; Architectural engineering; Human–computer interaction; Construction engineering; Engineering","score_opus":0.02029656381457495,"score_gpt":0.29956095905543323,"score_spread":0.2792643952408583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402148723","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00053525687,0.9932066,0.0007789015,0.0024251505,0.0010842845,0.000409369,0.0001749827,0.000013652728,0.0013717592],"genre_scores_gemma":[0.00696879,0.98763055,0.0021551906,0.0015634035,0.00048492392,0.00072675204,0.00017881594,0.00001582276,0.00027571907],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.96009296,0.01727591,0.013150406,0.0014378708,0.0074607595,0.0005820534],"domain_scores_gemma":[0.8036264,0.1397441,0.014559816,0.0033669064,0.037537295,0.0011653769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03469009,0.0014662176,0.0037133428,0.0339988,0.0015523664,0.004927977,0.002683501,0.0032334016,0.0051864837],"category_scores_gemma":[0.1396601,0.0012463186,0.0044960505,0.022880532,0.002305486,0.0050738496,0.002954704,0.0023808358,0.0009935205],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016354785,0.000043773874,0.00063742173,0.6662847,0.0013105302,0.00033443564,0.00172747,0.00029730104,0.0005660454,0.0047852383,0.017695105,0.30615452],"study_design_scores_gemma":[0.000041417654,0.00013658399,0.0018483673,0.7916525,0.0035810901,0.0004175072,0.0012384802,0.00012625173,0.00034821345,0.0017487751,0.19881035,0.00005044637],"about_ca_topic_score_codex":0.008358485,"about_ca_topic_score_gemma":0.017370267,"teacher_disagreement_score":0.03469009,"about_ca_system_score_codex":0.0080008255,"about_ca_system_score_gemma":0.03200137,"threshold_uncertainty_score":0.18346095},"labels":[],"label_agreement":null},{"id":"W4402596340","doi":"10.1061/jcemd4.coeng-14540","title":"The Need for a Multidimensional Project Control Perspective","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Perspective (graphical); Control (management); Computer science; Process management; Psychology; Engineering; Artificial intelligence","score_opus":0.023719385491330507,"score_gpt":0.32151474108833844,"score_spread":0.2977953555970079,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402596340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03246613,0.0017255602,0.93543845,0.002750703,0.00013803039,0.00028509522,0.00011634369,0.00012157893,0.026958125],"genre_scores_gemma":[0.59022826,0.0015313209,0.40550822,0.00039814098,0.0001515887,0.0004897161,0.000113478185,0.00006588717,0.0015133622],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9844349,0.00824561,0.00091207365,0.0018033123,0.0040994943,0.0005046332],"domain_scores_gemma":[0.9864775,0.0073136045,0.0020707978,0.0016138637,0.0020121112,0.0005122242],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010118532,0.0011152156,0.0009250623,0.003038013,0.0009893752,0.007976946,0.0016292311,0.0014061508,0.0022466208],"category_scores_gemma":[0.0116841085,0.00067117286,0.0011170582,0.0020038385,0.0044325297,0.0062760226,0.0035721005,0.0028503092,0.0002558766],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014891317,0.00028377352,0.009645636,0.001139897,0.00017616262,0.00021207432,0.0025111758,0.22123292,0.004754765,0.5913464,0.0016614186,0.16688684],"study_design_scores_gemma":[0.00014169412,0.0013574191,0.012091834,0.0014020443,0.0001875233,0.00040901825,0.006341143,0.4875784,0.0062194136,0.42583257,0.05808258,0.00035636473],"about_ca_topic_score_codex":0.0032008595,"about_ca_topic_score_gemma":0.0025570893,"teacher_disagreement_score":0.010118532,"about_ca_system_score_codex":0.0033706438,"about_ca_system_score_gemma":0.0045502284,"threshold_uncertainty_score":0.053512514},"labels":[],"label_agreement":null},{"id":"W4402685554","doi":"10.1061/jcemd4.coeng-15141","title":"Defining Information Requirements for Off-Site Construction Management: An Industry Case Study from Canada","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of New Brunswick","funders":"","keywords":"Construction industry; Business; Construction engineering; Process management; Computer science; Operations management; Engineering","score_opus":0.006128696407340709,"score_gpt":0.2059419381125638,"score_spread":0.1998132417052231,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402685554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94676346,0.00030035095,0.008694209,0.0023585914,0.00001593685,0.0010496713,0.00019643057,0.000046768208,0.040574573],"genre_scores_gemma":[0.97193414,0.00054103835,0.016908899,0.0003385289,0.000005558959,0.00018483755,0.0002727718,0.00003259547,0.00978167],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99182457,0.002064578,0.00040094065,0.00042765983,0.0035317405,0.0017504689],"domain_scores_gemma":[0.98833305,0.004456374,0.00069878175,0.0004648912,0.005082473,0.000964442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062487666,0.0005035378,0.00035165812,0.0024965033,0.011121797,0.004918721,0.002121704,0.0018212203,0.0013653615],"category_scores_gemma":[0.010012766,0.00048395098,0.00038238958,0.0043877494,0.003433216,0.0013996182,0.0025802033,0.0015108638,0.00020489041],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035511598,0.0019715526,0.14687692,0.0009822217,0.000051117506,0.035950076,0.50903666,0.016179794,0.01857298,0.039714392,0.015830608,0.2144785],"study_design_scores_gemma":[0.000058597972,0.00038428884,0.098277465,0.00060328166,0.00005728861,0.0026977453,0.72340775,0.019252243,0.007617542,0.002413967,0.14506528,0.0001644995],"about_ca_topic_score_codex":0.92330337,"about_ca_topic_score_gemma":0.9600533,"teacher_disagreement_score":0.076696634,"about_ca_system_score_codex":0.06553403,"about_ca_system_score_gemma":0.08021946,"threshold_uncertainty_score":0.4754849},"labels":[],"label_agreement":null},{"id":"W4402746450","doi":"10.1061/jcemd4.coeng-15041","title":"A Process-Improvement Method for Implementing Earned Value–Based Project Management in Organizations","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Earned value management; Value (mathematics); Process (computing); Process management; Project management; Business; OPM3; Computer science; Engineering management; Operations management; Program management; Engineering; Systems engineering","score_opus":0.028806829062632433,"score_gpt":0.366167920112844,"score_spread":0.33736109105021156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402746450","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008049576,0.000051558265,0.98441005,0.0003084184,0.00002107589,0.0009910914,0.000046776837,0.0007699656,0.0053514475],"genre_scores_gemma":[0.0412955,0.00005089677,0.9568281,0.00003158017,0.0000040786067,0.0008638558,0.000057679157,0.000036183992,0.00083198544],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98478645,0.007952,0.0009433805,0.0013304292,0.0046303174,0.00035739152],"domain_scores_gemma":[0.98786736,0.005925974,0.0013023759,0.0017781609,0.002925663,0.0002004106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013353207,0.0011553179,0.0005148167,0.0034723452,0.0013864746,0.0029215408,0.0017131249,0.0010949663,0.0032389022],"category_scores_gemma":[0.016290484,0.00074489345,0.0009782927,0.0026823897,0.0016602033,0.0032204173,0.001996083,0.001486282,0.0007548152],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016751884,0.000818641,0.004578466,0.0009643639,0.000076817814,0.0002311555,0.007303527,0.026246151,0.010042762,0.10083323,0.00312129,0.8456161],"study_design_scores_gemma":[0.00086685945,0.0048508556,0.01577631,0.0024505013,0.00045677365,0.0013928994,0.008787341,0.5687805,0.07310448,0.14557718,0.17742097,0.00053537585],"about_ca_topic_score_codex":0.002885022,"about_ca_topic_score_gemma":0.0031785136,"teacher_disagreement_score":0.013353207,"about_ca_system_score_codex":0.0021802003,"about_ca_system_score_gemma":0.0062612747,"threshold_uncertainty_score":0.070619404},"labels":[],"label_agreement":null},{"id":"W4402771627","doi":"10.1061/jcemd4.coeng-14690","title":"The Potential for Workplaces to Provide Social Support for Distressed Infrastructure Workers","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Homelessness and Social Issues","field":"Health Professions","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Water infrastructure; Engineering; Environmental engineering; Water supply","score_opus":0.009275171224899513,"score_gpt":0.3215583096050595,"score_spread":0.31228313838016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402771627","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9956637,0.0003199771,0.00020853896,0.0010368755,0.000021969283,0.000016802333,0.000029886516,0.0000047873314,0.0026974187],"genre_scores_gemma":[0.99939454,0.00012054215,0.0001460935,0.00007504123,0.000009293768,0.00000765635,0.000011180762,6.944343e-7,0.00023492567],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99866533,0.0005832058,0.00005418377,0.000061965904,0.00020730609,0.0004280278],"domain_scores_gemma":[0.99553466,0.0011011462,0.0011878903,0.00014363024,0.0003963361,0.001636291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010013527,0.00019610708,0.0001678727,0.0007095575,0.0015830352,0.0011244206,0.0004645561,0.0005084867,0.0034191262],"category_scores_gemma":[0.0068672276,0.00015871413,0.00025638356,0.00037662353,0.00068984326,0.00071488146,0.002326588,0.0006093497,0.00022623432],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021252249,0.0007949626,0.85480237,0.00023588096,0.000117249154,0.0013666508,0.02796557,0.00017109525,0.0025714831,0.00097392534,0.0019637505,0.10882467],"study_design_scores_gemma":[0.00001894718,0.00044793813,0.9360248,0.0002024333,0.00005230122,0.00065482256,0.05731618,0.0002759696,0.0002471436,0.00095159217,0.0037826877,0.000025322737],"about_ca_topic_score_codex":0.0038034425,"about_ca_topic_score_gemma":0.013383176,"teacher_disagreement_score":0.0038034425,"about_ca_system_score_codex":0.0006338019,"about_ca_system_score_gemma":0.0012963365,"threshold_uncertainty_score":0.011438131},"labels":[],"label_agreement":null},{"id":"W4403408544","doi":"10.1061/jcemd4.coeng-14618","title":"Fear Arousal Drives the Renewal of Active Avoidance of Hazards in Construction Sites: Evidence from an Animal Behavior Experiment in Mice","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Neural and Behavioral Psychology Studies","field":"Neuroscience","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Education and Child Care","funders":"","keywords":"Arousal; Psychology; Animal behavior; Cognitive psychology; Neuroscience; Developmental psychology; Biology; Zoology","score_opus":0.04622897328734388,"score_gpt":0.33536212432529927,"score_spread":0.2891331510379554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403408544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99813396,0.00010546325,0.0012338603,0.00007889091,0.000014019266,0.00003108098,0.00009144378,0.000026301323,0.000284929],"genre_scores_gemma":[0.99353325,0.0004072677,0.0034120781,0.00023588479,0.000014663113,0.0003486028,0.00020661124,0.000024044279,0.0018176112],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99963105,0.000075215416,0.000030144307,0.000095191695,0.00007630042,0.000092172195],"domain_scores_gemma":[0.999549,0.00006740741,0.00013483263,0.00007771431,0.000036517562,0.00013448924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005491585,0.0006177253,0.00041838706,0.0005216236,0.00025908684,0.00038972718,0.00058792223,0.0006054256,0.0008362672],"category_scores_gemma":[0.0004097225,0.00032451318,0.00074907765,0.000110741734,0.0010027436,0.00036213823,0.0005033725,0.0017392427,0.00014796088],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010710858,0.0010851126,0.002307609,0.00005110866,0.000025603982,0.000083656356,0.00016018293,0.00015588397,0.99291927,0.00021526148,0.000074349606,0.001850942],"study_design_scores_gemma":[0.00028387023,0.024339784,0.06456321,0.000058228474,0.00019474332,0.0004645834,0.00036487603,0.003643025,0.9036926,0.0008977923,0.0014250653,0.00007220657],"about_ca_topic_score_codex":0.00070465234,"about_ca_topic_score_gemma":0.0015531738,"teacher_disagreement_score":0.0008362672,"about_ca_system_score_codex":0.00034797835,"about_ca_system_score_gemma":0.00036181693,"threshold_uncertainty_score":0.0029042363},"labels":[],"label_agreement":null},{"id":"W4404741823","doi":"10.1061/jcemd4.coeng-15470","title":"Enhancing the Production Performance of Prefabricated Buildings through the Integrated Optimization of Precast Component Layout and Worker Allocation","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Component (thermodynamics); Prefabrication; Production (economics); Architectural engineering; Computer science; Construction engineering; Engineering; Structural engineering","score_opus":0.00527542911631025,"score_gpt":0.18407553737239837,"score_spread":0.17880010825608814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404741823","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47782433,0.0006638366,0.5120246,0.00009627479,0.000040033723,0.00009463857,0.000100033976,0.0005176788,0.008638601],"genre_scores_gemma":[0.9363981,0.00018858784,0.062292054,0.000011742053,0.0000053946596,0.00004869295,0.00007365533,0.00004197851,0.00093984377],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971086,0.000050737908,0.000010511701,0.000053968415,0.00010321858,0.00007068312],"domain_scores_gemma":[0.9997296,0.00010882076,0.000064324806,0.00003219092,0.00004753134,0.000017507278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000513208,0.0012468054,0.00060407055,0.0005843931,0.0003527366,0.000859348,0.0005434114,0.00055248424,0.001210766],"category_scores_gemma":[0.0007660219,0.00041137074,0.00064627716,0.00052415376,0.000296492,0.0006018451,0.0006024204,0.00045316797,0.00021102405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056656238,0.000082235056,0.0015108791,0.00010249692,0.000021224885,0.0000640837,0.00003119624,0.9375638,0.02671165,0.0005883563,0.00012654303,0.03314091],"study_design_scores_gemma":[0.000015193061,0.00026891544,0.0023528493,0.000009731704,0.000036591107,0.000031277774,0.000046549507,0.98278975,0.013114981,0.00067393255,0.00064635114,0.0000138221785],"about_ca_topic_score_codex":0.0027184144,"about_ca_topic_score_gemma":0.0048248633,"teacher_disagreement_score":0.0027184144,"about_ca_system_score_codex":0.0005905019,"about_ca_system_score_gemma":0.0009234749,"threshold_uncertainty_score":0.005405128},"labels":[],"label_agreement":null},{"id":"W4405121956","doi":"10.1061/jcemd4.coeng-15012","title":"Smart Rehabilitation-Planning Framework for Sustainable Infrastructure: Roofing Application","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rehabilitation; Business; Architectural engineering; Environmental planning; Process management; Construction engineering; Environmental resource management; Engineering; Medicine; Environmental science; Physical therapy","score_opus":0.002145444692990706,"score_gpt":0.21198437088660538,"score_spread":0.20983892619361466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405121956","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013477796,0.00029929497,0.9737104,0.00039730672,0.000038953254,0.00018123352,0.0010114021,0.0029722466,0.007911355],"genre_scores_gemma":[0.36648068,0.0005559018,0.62655973,0.0001125524,0.00002867863,0.00039330122,0.0014739509,0.0002366427,0.0041586473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975055,0.000057071178,0.000017942391,0.000067690766,0.00006667843,0.000040088475],"domain_scores_gemma":[0.999775,0.000086125576,0.000024855977,0.00002144649,0.00005818125,0.00003436621],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000560344,0.0007923968,0.00065722445,0.0008253378,0.00048384746,0.0011417266,0.0014784724,0.00095065834,0.0065409066],"category_scores_gemma":[0.0010276028,0.00044108974,0.0010172311,0.0008245705,0.00043662486,0.00078492175,0.0013113436,0.0007259242,0.00067100086],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028325478,0.000047114074,0.0013645943,0.00009477994,0.000029169185,0.00013971825,0.000085504056,0.9453379,0.0010356406,0.013784563,0.0026880028,0.03536478],"study_design_scores_gemma":[0.0000051964416,0.000009049032,0.00013181347,0.000008775726,0.0000057450566,0.000017280783,0.000027169437,0.9936605,0.00025157555,0.003536392,0.0023415065,0.0000049140963],"about_ca_topic_score_codex":0.025999617,"about_ca_topic_score_gemma":0.045761257,"teacher_disagreement_score":0.025999617,"about_ca_system_score_codex":0.0012635208,"about_ca_system_score_gemma":0.0019370478,"threshold_uncertainty_score":0.05169654},"labels":[],"label_agreement":null},{"id":"W4406149796","doi":"10.1061/jcemd4.coeng-14896","title":"Gap Analysis of Digitalization Levels in Construction and Manufacturing: A Comparative Study of Construction 4.0 and Industry 4.0","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Manufacturing engineering; Manufacturing; Business; Engineering; Construction engineering; Marketing","score_opus":0.01773918978812374,"score_gpt":0.2443927242918659,"score_spread":0.22665353450374215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406149796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9893734,0.000907686,0.00070845545,0.00027387874,0.000006014416,0.000033272823,0.00031736813,0.000009574068,0.0083703725],"genre_scores_gemma":[0.99875283,0.00036229682,0.00037841516,0.000017753815,0.000002652954,0.00002163595,0.00020508557,0.00000292799,0.00025643109],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9957201,0.0012612584,0.00056571787,0.00037933642,0.0014685792,0.0006050975],"domain_scores_gemma":[0.9692295,0.018918166,0.0056786835,0.00089806475,0.004387274,0.00088819215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061315503,0.00014204612,0.00046440357,0.023389788,0.0011151449,0.0036198208,0.00061143615,0.00051855005,0.0034639405],"category_scores_gemma":[0.02564916,0.00018198673,0.00044262587,0.03226561,0.0016372076,0.005994963,0.0036041457,0.00047676644,0.00021757887],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029415413,0.0002045479,0.7638283,0.0014878814,0.00014960891,0.00054320187,0.09268051,0.0009020284,0.0008944647,0.026753498,0.0010204558,0.11124137],"study_design_scores_gemma":[0.0000070125566,0.00015511866,0.7797991,0.00049415295,0.00006973247,0.00024868964,0.20490505,0.0015018402,0.00061609654,0.0026996115,0.0094759315,0.000027675911],"about_ca_topic_score_codex":0.007853935,"about_ca_topic_score_gemma":0.008996306,"teacher_disagreement_score":0.023389788,"about_ca_system_score_codex":0.0044987835,"about_ca_system_score_gemma":0.0037590116,"threshold_uncertainty_score":0.032641113},"labels":[],"label_agreement":null},{"id":"W4408919160","doi":"10.1061/jcemd4.coeng-15577","title":"Joint Optimization of Critical Concession Parameters for Sustainable PPP Contracts","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Joint (building); Business; Structural engineering; Engineering","score_opus":0.011993428726821093,"score_gpt":0.24086674930063923,"score_spread":0.22887332057381812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408919160","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044744544,0.00037842526,0.94634306,0.00027417415,0.00003452747,0.00017491456,0.00007195691,0.00009353693,0.007884935],"genre_scores_gemma":[0.86926454,0.0003258102,0.12699932,0.00007254281,0.00001359482,0.00035958042,0.00010288557,0.000073090436,0.002788686],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998757,0.0005437497,0.000057880396,0.00021193929,0.00021583991,0.00021360381],"domain_scores_gemma":[0.99763227,0.0015867889,0.00029202903,0.00010445705,0.00025872607,0.00012556382],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034999808,0.001451135,0.001429192,0.0010141631,0.0007557311,0.0026563471,0.0010450543,0.0018301125,0.0031578613],"category_scores_gemma":[0.008562026,0.00086603424,0.0010393452,0.0009775255,0.0011886078,0.0024573244,0.0019396622,0.0021839817,0.00030223659],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050991704,0.000041059433,0.0006337662,0.00008340254,0.000022681294,0.00009186888,0.000075722295,0.9683063,0.0008671306,0.018226705,0.0004614119,0.011138972],"study_design_scores_gemma":[0.000009795641,0.00003447451,0.00017453636,0.000018918723,0.000012561166,0.000023796882,0.00005908271,0.98770344,0.0004959013,0.010878942,0.0005752849,0.000013206491],"about_ca_topic_score_codex":0.004327243,"about_ca_topic_score_gemma":0.0036909604,"teacher_disagreement_score":0.004327243,"about_ca_system_score_codex":0.0018786158,"about_ca_system_score_gemma":0.0033590535,"threshold_uncertainty_score":0.018509924},"labels":[],"label_agreement":null},{"id":"W4408994207","doi":"10.1061/jcemd4.coeng-15335","title":"Enhancing the Manufacturing Process in Light-Gauge Steel Off-Site Construction Using Semiautomation","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure","funders":"","keywords":"Gauge (firearms); Process (computing); Manufacturing engineering; Engineering; Materials science; Computer science; Metallurgy","score_opus":0.0029992384564745574,"score_gpt":0.1955731219444556,"score_spread":0.19257388348798105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408994207","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20229796,0.0003650772,0.78090614,0.00029126427,0.000056805133,0.0005949265,0.00017267473,0.0023465056,0.012968594],"genre_scores_gemma":[0.41523197,0.00028489443,0.58006537,0.0000675958,0.0000129992895,0.0002906253,0.00026849713,0.00016036397,0.0036176061],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99782526,0.0008013947,0.00013029666,0.00032021824,0.00073868997,0.0001842306],"domain_scores_gemma":[0.9965113,0.0011906385,0.00045708113,0.0012250348,0.00048691125,0.00012900855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020768207,0.00066263904,0.00042360707,0.0011350234,0.0006526256,0.0013723609,0.0011859343,0.00059440825,0.0033235839],"category_scores_gemma":[0.003160674,0.00035218385,0.0006985682,0.0011306879,0.0007621486,0.0011614807,0.0014083043,0.00049432047,0.001095453],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004617357,0.0006589995,0.009328541,0.0010994961,0.00003664935,0.00057590124,0.0021435109,0.07478371,0.10654346,0.009819691,0.0022438494,0.79230434],"study_design_scores_gemma":[0.0003907923,0.004487897,0.07523419,0.00076088024,0.00022184075,0.0029230008,0.0045373593,0.4305377,0.23410082,0.035192925,0.21107481,0.0005378029],"about_ca_topic_score_codex":0.002967038,"about_ca_topic_score_gemma":0.0047185933,"teacher_disagreement_score":0.0033235839,"about_ca_system_score_codex":0.0009517364,"about_ca_system_score_gemma":0.002956265,"threshold_uncertainty_score":0.011118472},"labels":[],"label_agreement":null},{"id":"W4409276712","doi":"10.1061/jcemd4.coeng-15014","title":"Evaluating the Potential Impact of Building Design Strategies on Material Recovery during Deconstruction","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Deconstruction (building); Architectural engineering; Construction engineering; Engineering; Waste management","score_opus":0.008487392371202229,"score_gpt":0.2564341499210844,"score_spread":0.24794675754988216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409276712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9640021,0.00016852173,0.02418081,0.00008261334,0.0000037379475,0.000291596,0.00013397097,0.000033008942,0.011103612],"genre_scores_gemma":[0.980586,0.0001322087,0.018456329,0.000007647505,5.0609793e-7,0.000059944803,0.00006848733,0.000007730276,0.0006812914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99877185,0.0005148007,0.000038270457,0.00007468764,0.00042862166,0.00017174215],"domain_scores_gemma":[0.99798214,0.0012057826,0.00023920806,0.00012230738,0.00040121327,0.00004936973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027181623,0.0008429512,0.00034181032,0.0010305223,0.0004026228,0.0013456022,0.00059935363,0.0005537334,0.0014843238],"category_scores_gemma":[0.0040270044,0.00022615885,0.0004989885,0.0007320756,0.0007059769,0.0010658477,0.0006435301,0.00031764625,0.00013480008],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048063346,0.00045177218,0.032097977,0.00035482977,0.000114339025,0.00021230188,0.00035330304,0.83638203,0.022563525,0.008658191,0.00024023709,0.09809089],"study_design_scores_gemma":[0.00008883926,0.003629221,0.045986615,0.00012423581,0.0002769345,0.00012660377,0.0023954904,0.87689954,0.057987403,0.0076292236,0.0047669057,0.00008892292],"about_ca_topic_score_codex":0.018757956,"about_ca_topic_score_gemma":0.049707983,"teacher_disagreement_score":0.018757956,"about_ca_system_score_codex":0.0038829674,"about_ca_system_score_gemma":0.002811959,"threshold_uncertainty_score":0.037297547},"labels":[],"label_agreement":null},{"id":"W4409704129","doi":"10.1061/jcemd4.coeng-15381","title":"Data-Driven Assessment of Complexity-Induced Risks in Infrastructure Projects","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Risk analysis (engineering); Risk assessment; Business; Computer science; Data science; Computer security","score_opus":0.13013666474255117,"score_gpt":0.4029982656097152,"score_spread":0.27286160086716404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409704129","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71219814,0.0005647875,0.27453405,0.0012117728,0.00005638551,0.000372777,0.0022302466,0.00036993533,0.008461918],"genre_scores_gemma":[0.9719706,0.00021543489,0.026104575,0.000044747427,0.000013351287,0.0001306483,0.0010812068,0.000026438955,0.00041307087],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9964784,0.0014474392,0.00029464788,0.00047466805,0.0010869893,0.00021784355],"domain_scores_gemma":[0.98174393,0.010770316,0.0032847626,0.0012518056,0.0024541654,0.0004950711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005285308,0.00090487604,0.0005989593,0.0028253575,0.0004098422,0.0025690529,0.0012167472,0.0012580797,0.00097130716],"category_scores_gemma":[0.02127709,0.00048739114,0.0007520969,0.0020304827,0.00080286735,0.0026595031,0.0020751976,0.001331088,0.00019131506],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013166627,0.00023129006,0.10827183,0.0002983691,0.00015650853,0.0002806714,0.0004465801,0.8410345,0.0020795115,0.010060027,0.0010085427,0.036000554],"study_design_scores_gemma":[0.0000070449846,0.00010405385,0.028723478,0.00007926697,0.000033023854,0.000078545316,0.0004444903,0.95793486,0.0014918721,0.009708908,0.0013471947,0.000047197194],"about_ca_topic_score_codex":0.005412113,"about_ca_topic_score_gemma":0.005731396,"teacher_disagreement_score":0.005412113,"about_ca_system_score_codex":0.0017457281,"about_ca_system_score_gemma":0.001857739,"threshold_uncertainty_score":0.027951717},"labels":[],"label_agreement":null},{"id":"W4410311323","doi":"10.1061/jcemd4.coeng-15563","title":"Impact of Energy-Based Safety Training on Quality of Prejob Safety Meetings and Control of Hazardous Energy in Construction: Multiple Baseline Experiment","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Baseline (sea); Hazardous waste; Energy (signal processing); Control (management); Training (meteorology); Quality (philosophy); Computer science; Engineering; Artificial intelligence; Waste management; Political science; Geography; Statistics","score_opus":0.02825545830384441,"score_gpt":0.38143544550189107,"score_spread":0.35317998719804666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410311323","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99806803,0.000022057837,0.0007453969,0.000028923308,0.000021519862,0.0006358488,0.00007549029,0.000024259618,0.0003784875],"genre_scores_gemma":[0.98155427,0.00010817833,0.010033362,0.0001524785,0.000059354952,0.00471493,0.00027221223,0.00002204897,0.0030832263],"study_design_codex":"nonrandomized_trial","study_design_gemma":"nonrandomized_trial","domain_scores_codex":[0.997417,0.0009637438,0.00022194642,0.0005568207,0.00051209726,0.00032835294],"domain_scores_gemma":[0.99334705,0.0028607599,0.0011985862,0.0007923463,0.0007314139,0.0010698491],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029153826,0.00088502746,0.00079312123,0.0003782252,0.00079186575,0.0006279698,0.0010849026,0.0010817642,0.004078386],"category_scores_gemma":[0.00746838,0.0005704177,0.0005785741,0.0002198454,0.0008589542,0.0005660402,0.0010989336,0.0014071682,0.00039162397],"study_design_candidate":"nonrandomized_trial","study_design_consensus":"nonrandomized_trial","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.10155582,0.5362835,0.030860677,0.0012479271,0.0004911613,0.00019275148,0.004658047,0.0048106806,0.21169393,0.00042237082,0.0010907297,0.10669229],"study_design_scores_gemma":[0.009309451,0.7091419,0.22841434,0.000116728195,0.00037228485,0.000050961422,0.0009072583,0.0037955383,0.044529323,0.00056819053,0.0026576617,0.00013632588],"about_ca_topic_score_codex":0.0025769596,"about_ca_topic_score_gemma":0.0055920514,"teacher_disagreement_score":0.004078386,"about_ca_system_score_codex":0.0010395308,"about_ca_system_score_gemma":0.0016315986,"threshold_uncertainty_score":0.015418172},"labels":[],"label_agreement":null},{"id":"W4411379290","doi":"10.1061/jcemd4.coeng-15724","title":"Assessing an Immersive Virtual Reality–Based Simulation Game Capability to Study the Social Mechanisms Enabled by the Last Planner System in Projects","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Virtual reality; Human–computer interaction; Computer science; Simulation; Artificial intelligence","score_opus":0.011604140962274663,"score_gpt":0.25556153245668267,"score_spread":0.243957391494408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411379290","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99113935,0.000019116362,0.007305617,0.000027670163,0.0000070154483,0.0002526489,0.00006592871,0.000057768048,0.001124877],"genre_scores_gemma":[0.9761485,0.000047725305,0.02259934,0.000030165522,0.0000042257507,0.00049806444,0.00017126121,0.000015736172,0.00048502744],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982085,0.00095535954,0.00013434872,0.00018944002,0.00033786253,0.00017449087],"domain_scores_gemma":[0.9952544,0.0024399536,0.0008236093,0.00034646702,0.00049728906,0.00063833606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023983652,0.0009623647,0.00035490276,0.0006874383,0.00031511916,0.0011078544,0.00092427677,0.0006096904,0.002111173],"category_scores_gemma":[0.009439116,0.00040616325,0.00050971296,0.00022812028,0.0005383244,0.001132055,0.0015499841,0.0006534228,0.00026324007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044401055,0.029337037,0.34566277,0.003193088,0.0010000804,0.0017066329,0.041424192,0.077421285,0.2390837,0.0080487495,0.0038915419,0.24479075],"study_design_scores_gemma":[0.0012191576,0.046582356,0.6042802,0.00047469288,0.00067139347,0.0011498468,0.016870534,0.23662409,0.06693421,0.005313951,0.019267997,0.00061168976],"about_ca_topic_score_codex":0.0012627455,"about_ca_topic_score_gemma":0.0021047697,"teacher_disagreement_score":0.0023983652,"about_ca_system_score_codex":0.00044871666,"about_ca_system_score_gemma":0.00060535927,"threshold_uncertainty_score":0.012683928},"labels":[],"label_agreement":null},{"id":"W4411515923","doi":"10.1061/jcemd4.coeng-16481","title":"Statistical Hypothesis Test Approach Considering Workers’ Thermal Comfort to Determine Nonworking Days in Different Climate Zones","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Test (biology); Environmental science; Statistical analysis; Statistical hypothesis testing; Statistics; Geology; Mathematics","score_opus":0.0076769956806096405,"score_gpt":0.1854745928463046,"score_spread":0.17779759716569496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411515923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6299953,0.00045427814,0.35909522,0.0003572884,0.0002776956,0.0014832545,0.001542298,0.00046221173,0.006332494],"genre_scores_gemma":[0.9376954,0.00012864532,0.058290392,0.00009793561,0.00007853027,0.0018458971,0.0009897114,0.000029243707,0.00084412255],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9863305,0.0065813544,0.0009468188,0.0025999395,0.0027905463,0.0007507611],"domain_scores_gemma":[0.9363819,0.05552726,0.0031553572,0.0013917348,0.002864309,0.00067955063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01653075,0.0010677812,0.0014637553,0.0024374595,0.00089307287,0.0017778921,0.0018709939,0.0012893314,0.0073056235],"category_scores_gemma":[0.037263773,0.00027119467,0.0027470903,0.0017641616,0.0014156771,0.0014510937,0.0012042342,0.0021844183,0.0005223951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00899279,0.0027693484,0.50533056,0.0021632419,0.005186216,0.0017255835,0.00463293,0.08387737,0.018620152,0.028003957,0.0044175778,0.33428022],"study_design_scores_gemma":[0.0005479518,0.016659847,0.35575613,0.00035183344,0.0016047903,0.00063538126,0.008439845,0.57136846,0.017641991,0.019169964,0.0075712134,0.00025248737],"about_ca_topic_score_codex":0.0018702914,"about_ca_topic_score_gemma":0.0012551455,"teacher_disagreement_score":0.01653075,"about_ca_system_score_codex":0.0009847549,"about_ca_system_score_gemma":0.0015350847,"threshold_uncertainty_score":0.08742404},"labels":[],"label_agreement":null},{"id":"W4415589477","doi":"10.1061/jcemd4.coeng-16638","title":"Minds at Work: A Design for an Experimental Approach to Assessing Cognitive Abilities in Construction","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Educational and Psychological Assessments","field":"Psychology","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Task (project management); Cognition; Context (archaeology); Cognitive load; Task analysis; Elementary cognitive task; Workload; Key (lock)","score_opus":0.05153031605841683,"score_gpt":0.3656975535408376,"score_spread":0.31416723748242076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415589477","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35680395,0.0006245657,0.37036765,0.00074039825,0.0027532557,0.25295493,0.0014561459,0.001368336,0.012930649],"genre_scores_gemma":[0.114036016,0.00022315032,0.3716719,0.0006630391,0.00016538319,0.5104162,0.00022619292,0.00012367187,0.0024744559],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9851608,0.008138943,0.0012015863,0.0024908974,0.002054208,0.0009534841],"domain_scores_gemma":[0.98227155,0.0108024925,0.0018531061,0.0025632503,0.0017671402,0.00074246316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014056839,0.0021971497,0.0015443962,0.0013433094,0.001782136,0.0017267236,0.00237398,0.0025232947,0.010400317],"category_scores_gemma":[0.025375891,0.001302542,0.0022535129,0.0007986097,0.0025920826,0.0014448246,0.0026600698,0.0034275674,0.0013092384],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.1129362,0.126215,0.020980047,0.013061483,0.0022270454,0.0011229638,0.01907015,0.01821844,0.22226939,0.068153284,0.009251469,0.38649464],"study_design_scores_gemma":[0.07143119,0.5549793,0.055201456,0.0020171115,0.0033038156,0.0003811789,0.0038413776,0.04962482,0.07594288,0.059173726,0.123088375,0.0010147555],"about_ca_topic_score_codex":0.0008895921,"about_ca_topic_score_gemma":0.0010680162,"teacher_disagreement_score":0.014056839,"about_ca_system_score_codex":0.0014715223,"about_ca_system_score_gemma":0.0031551698,"threshold_uncertainty_score":0.07434058},"labels":[],"label_agreement":null},{"id":"W4415666012","doi":"10.1061/jcemd4.coeng-16666","title":"Physical, Cognitive, and Emotional Responses and Their Interrelated Effects on Human–Robot Team Performance in Construction","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Task (project management); Productivity; Cohesion (chemistry); Crisis response; Emotional intelligence; Group cohesiveness","score_opus":0.022072861413168773,"score_gpt":0.37697383699935894,"score_spread":0.35490097558619016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415666012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9992466,0.000028054332,0.00033664316,0.000015409112,0.0000027855808,0.0000059856234,0.000005139342,0.0000025613244,0.00035689454],"genre_scores_gemma":[0.9995339,0.000027399188,0.00024599585,0.0000087543085,0.000002961769,0.000011031321,0.000009617817,0.0000016932848,0.00015866623],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987431,0.0006411567,0.00005741778,0.00015176497,0.00024069188,0.0001659008],"domain_scores_gemma":[0.9966522,0.0014408639,0.0007974307,0.00014784954,0.00037976739,0.00058195356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001571555,0.00035312236,0.00023425954,0.0003613049,0.0005813947,0.0008057196,0.0002024612,0.000463474,0.0010790125],"category_scores_gemma":[0.0056029097,0.00016428724,0.0002008509,0.00015021006,0.00079379417,0.0002096129,0.0009721363,0.0003425402,0.00017466104],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022448148,0.0023184528,0.7378696,0.0005504789,0.00036412152,0.0009701831,0.03921407,0.0045881737,0.117383346,0.00032786396,0.0006760428,0.09349289],"study_design_scores_gemma":[0.00001103719,0.0009886652,0.9879424,0.00002243048,0.000032953412,0.00011680437,0.0073230616,0.0011457723,0.0019632855,0.00015323423,0.000273666,0.000026680482],"about_ca_topic_score_codex":0.0011624553,"about_ca_topic_score_gemma":0.0015543485,"teacher_disagreement_score":0.001571555,"about_ca_system_score_codex":0.00024986587,"about_ca_system_score_gemma":0.00025322905,"threshold_uncertainty_score":0.008311272},"labels":[],"label_agreement":null},{"id":"W4416273186","doi":"10.1061/jcemd4.coeng-16899","title":"Enhancing Circularity in the Building Industry: A Review of Material Passports and Digital Twin Technologies","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; National Research Council Canada","funders":"","keywords":"Reuse; Scalability; Key (lock); Emerging technologies; The Internet; Systematic review","score_opus":0.003023970041466548,"score_gpt":0.19320125097995616,"score_spread":0.19017728093848962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416273186","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00020834227,0.9987264,0.00018875796,0.00030714093,0.00007814572,0.000027651493,0.000040616967,0.0000032986093,0.00041973966],"genre_scores_gemma":[0.002094494,0.9969382,0.00045711978,0.00031633594,0.000041116007,0.000045593642,0.000039894465,0.0000026559267,0.00006452166],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942932,0.0018493847,0.0018035091,0.00051926053,0.0013377671,0.00019697125],"domain_scores_gemma":[0.97173226,0.022711731,0.0027157408,0.00037281,0.002201199,0.00026632557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006927506,0.0012875422,0.0030922971,0.011918076,0.0007409263,0.0036139057,0.0016555839,0.0023687356,0.003707487],"category_scores_gemma":[0.021358145,0.0008402101,0.0039841975,0.012936355,0.0014109825,0.00443104,0.0018130505,0.0018286338,0.0005551023],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008843268,0.000060568564,0.0005442932,0.65044457,0.0010071452,0.00016315705,0.0008985087,0.0003857545,0.00042642566,0.005762206,0.005118519,0.33510044],"study_design_scores_gemma":[0.000032856467,0.00021824587,0.0030115647,0.69005066,0.005859559,0.0006771948,0.0010615417,0.00018319121,0.0003628255,0.0031582303,0.29532468,0.000059510243],"about_ca_topic_score_codex":0.0075754058,"about_ca_topic_score_gemma":0.017772838,"teacher_disagreement_score":0.011918076,"about_ca_system_score_codex":0.0027408756,"about_ca_system_score_gemma":0.015240741,"threshold_uncertainty_score":0.03663659},"labels":[],"label_agreement":null},{"id":"W4416384076","doi":"10.1061/jcemd4.coeng-16673","title":"On- and Off-Site Coordination in a Modular Construction Supply Chain: Domain-Spanning Production Flow Framing and Evaluation","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College","funders":"","keywords":"Framing (construction); Modular design; Supply chain; Production (economics); Synchronization (alternating current); Material flow; Frame (networking)","score_opus":0.0034051873053584,"score_gpt":0.1952614508077989,"score_spread":0.19185626350244048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416384076","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68723375,0.00016118764,0.2936929,0.00020334484,0.000030019577,0.0010845695,0.00015455724,0.00012733565,0.017312294],"genre_scores_gemma":[0.9100155,0.00008266636,0.08887777,0.000018420695,0.0000049201153,0.0003459836,0.00009966256,0.000014547157,0.000540603],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99456525,0.0034375035,0.00019310233,0.00040598013,0.0011302236,0.00026792302],"domain_scores_gemma":[0.9845339,0.008956592,0.0016196435,0.0010190216,0.003484068,0.000386684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0149473585,0.0005287651,0.00032151592,0.003559291,0.00087349664,0.0019049675,0.0006483593,0.00054318534,0.0021336826],"category_scores_gemma":[0.024849076,0.00023849281,0.0004354209,0.0020160577,0.0023521371,0.0026366198,0.0021224883,0.00065907266,0.0001224795],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009674569,0.0013948368,0.13360465,0.0011292567,0.00012923485,0.00052299775,0.024227181,0.18004198,0.01752365,0.19736385,0.0017620103,0.4413329],"study_design_scores_gemma":[0.000120380646,0.0020133303,0.09404546,0.0006832273,0.00018371231,0.00023971642,0.030358426,0.7791381,0.025301162,0.057270166,0.010470518,0.00017581484],"about_ca_topic_score_codex":0.003819128,"about_ca_topic_score_gemma":0.0044482993,"teacher_disagreement_score":0.0149473585,"about_ca_system_score_codex":0.003348765,"about_ca_system_score_gemma":0.0026314526,"threshold_uncertainty_score":0.07905012},"labels":[],"label_agreement":null},{"id":"W7117763172","doi":"10.1061/jcemd4.coeng-17206","title":"Data-Driven Approach to Analyzing Factors Influencing Construction Accident Severity Using SHAP Analysis","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Accident (philosophy); Accident analysis; Scale (ratio); Resource (disambiguation); Risk assessment; Prioritization; Class (philosophy)","score_opus":0.06475457635607429,"score_gpt":0.4080477901761098,"score_spread":0.3432932138200355,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117763172","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22156502,0.00020846135,0.7731889,0.00035139243,0.000062790896,0.0002544897,0.0017351373,0.0009677021,0.0016660765],"genre_scores_gemma":[0.8803316,0.000104953906,0.11597884,0.00007457686,0.00004968728,0.00019937713,0.0024007778,0.000054033786,0.00080632005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9989496,0.00040128737,0.00008033569,0.0002142142,0.0002646353,0.00008994768],"domain_scores_gemma":[0.99717927,0.0013592192,0.0003364241,0.0002611245,0.00076555484,0.00009840195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028638043,0.00096978055,0.0007490816,0.0032367862,0.0003465072,0.0008256799,0.0009211347,0.0004889789,0.0014507696],"category_scores_gemma":[0.006516989,0.00033357088,0.0012582768,0.0015367218,0.00042255843,0.0007899853,0.0009914743,0.00078794826,0.0003312641],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045079636,0.00052266545,0.18042178,0.0004818963,0.0006437647,0.00034535714,0.00046869187,0.54334414,0.009034316,0.013172677,0.0040957243,0.24701816],"study_design_scores_gemma":[0.000011260594,0.00008297259,0.017467568,0.00002349673,0.00005776412,0.000040834093,0.00011413869,0.9715229,0.0018853524,0.0076357834,0.0011356222,0.000022240953],"about_ca_topic_score_codex":0.0032502706,"about_ca_topic_score_gemma":0.0042763725,"teacher_disagreement_score":0.0032502706,"about_ca_system_score_codex":0.00066145626,"about_ca_system_score_gemma":0.0010854861,"threshold_uncertainty_score":0.015145481},"labels":[],"label_agreement":null}]}