{"meta":{"query_hash":"7e649050b413","filters":{"venue":"Journal of Construction in Developing Countries"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/7e649050b413","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Construction+in+Developing+Countries"},"results":[{"id":"W2405833297","doi":"10.21315/jcdc2016.21.1.4","title":"Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran","year":2016,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":93,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Cost overrun; Bidding; Schedule; Cash flow; Business; Duration (music); Actuarial science; Operations management; Construction industry; Economics; Finance; Marketing; Engineering; Construction engineering","score_opus":0.09891297228128945,"score_gpt":0.3655730460287283,"score_spread":0.26666007374743883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2405833297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9704404,0.00022624218,0.020208726,0.006851397,0.0014421717,0.0005809402,0.000010589492,0.0000061096625,0.00023343391],"genre_scores_gemma":[0.99305505,0.0008926628,0.0057552983,0.00010821897,0.000110755165,0.000022327013,1.3971365e-7,0.0000063731163,0.000049194547],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976508,0.00022787297,0.0012758431,0.00018849864,0.00046769812,0.00018926206],"domain_scores_gemma":[0.9953382,0.0025703532,0.0011537471,0.00021515186,0.000696214,0.00002630428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050401157,0.00013091839,0.00032024863,0.0006841771,0.00029822128,0.00017011035,0.00029746638,0.00006249147,0.000031982516],"category_scores_gemma":[0.0019025248,0.00006154101,0.000068349116,0.000931914,0.000847329,0.00082906085,0.00007572203,0.00016109117,0.0000010229973],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000331971,0.000010797213,0.5968609,0.00003897508,0.000057159312,0.000034794193,0.002604657,0.0000440091,0.00003429075,0.07263324,0.0006676414,0.32668158],"study_design_scores_gemma":[0.015303026,0.00056902523,0.29432204,0.0027218268,0.00021594402,0.059291188,0.14451462,0.0018188127,0.0022048352,0.11665099,0.36129212,0.0010955498],"about_ca_topic_score_codex":0.00005675535,"about_ca_topic_score_gemma":0.0007858476,"teacher_disagreement_score":0.3606245,"about_ca_system_score_codex":0.000119000644,"about_ca_system_score_gemma":0.00037303483,"threshold_uncertainty_score":0.3122019},"labels":[],"label_agreement":null},{"id":"W2599393935","doi":"10.21315/jcdc2016.21.1.9","title":"Finite Element Modelling of Cyclic Behaviour of Cold-Formed Steel Bolted Moment-Resisting Connections","year":2016,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Structural engineering; Dissipation; Finite element method; Moment (physics); Connection (principal bundle); Cold-formed steel; Beam (structure); Engineering; Element (criminal law); Shell (structure); Mechanical engineering; Physics","score_opus":0.017309747342057466,"score_gpt":0.23131508047612054,"score_spread":0.21400533313406306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2599393935","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8520467,0.00019378256,0.14682716,0.00016998364,0.0005710753,0.00007449879,0.00001566069,0.000028116641,0.00007298013],"genre_scores_gemma":[0.97915304,0.00065023155,0.020087345,0.0000066785256,0.00005769952,0.0000036240963,9.634506e-7,0.000017270047,0.000023126931],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99791926,0.000038553495,0.0013326074,0.00010641686,0.00038898052,0.0002141766],"domain_scores_gemma":[0.9982607,0.00032376696,0.000685231,0.0001310752,0.0005511497,0.00004809739],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003887026,0.00015996154,0.00047431365,0.000711337,0.000074156735,0.000022348,0.00014663169,0.000085743275,0.00003795344],"category_scores_gemma":[0.0001393265,0.00013208359,0.00011300422,0.00048400677,0.00013610639,0.00030417414,0.00002361811,0.00014828138,0.000001017713],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016484203,0.000031899042,0.34991705,0.0006527433,0.0011504125,0.00001745544,0.0012581317,0.5446674,0.072249085,0.025642203,0.00015128756,0.0040974948],"study_design_scores_gemma":[0.0048881066,0.0001799546,0.060211703,0.004779693,0.0005050659,0.00029017354,0.002000031,0.030148255,0.8898079,0.0030023267,0.003267435,0.0009194022],"about_ca_topic_score_codex":0.000034015422,"about_ca_topic_score_gemma":0.000024263554,"teacher_disagreement_score":0.81755877,"about_ca_system_score_codex":0.0003486589,"about_ca_system_score_gemma":0.00016805345,"threshold_uncertainty_score":0.53862125},"labels":[],"label_agreement":null},{"id":"W4226169875","doi":"10.21315/jcdc-08-20-0186","title":"Solutions to Overcome Integrated Project Delivery Implementation Barriers: A Meta-Synthesis Approach","year":2022,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Integrated project delivery; Process management; Computer science; Project team; Context (archaeology); Construction industry; Pre-construction services; Project stakeholder; Engineering management; Coding (social sciences); Project charter; Knowledge management; Project planning; Project management; Construction engineering; Systems engineering; Business; Engineering","score_opus":0.03932731714222512,"score_gpt":0.25683877024065543,"score_spread":0.2175114530984303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226169875","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75545484,0.00092270673,0.22089323,0.012342239,0.0058333515,0.0016137154,0.000055369946,0.00027373023,0.0026108143],"genre_scores_gemma":[0.9595322,0.00010943848,0.037105333,0.0020575926,0.00051133323,0.0005594921,0.000016848524,0.000039872888,0.000067885754],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99852866,0.000045219993,0.00058794365,0.00015180347,0.0004509771,0.00023541204],"domain_scores_gemma":[0.99916875,0.000052482676,0.00038268676,0.000099264566,0.00028225099,0.000014556961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012554474,0.00015249774,0.00031551917,0.0013668617,0.00036313466,0.00020785052,0.00021358936,0.000024456627,0.0005104002],"category_scores_gemma":[0.00016667647,0.00014376338,0.00011625872,0.001144943,0.00003337026,0.0008755276,0.00017253414,0.00019823803,0.0000051795323],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008129333,0.00023788435,0.046111315,0.0014436131,0.0064133266,0.00014350012,0.0056575476,0.24382748,0.0001781096,0.4880134,0.15120643,0.05595447],"study_design_scores_gemma":[0.0008800241,0.00003510684,0.00573593,0.00005739133,0.0007350184,0.00014288303,0.018574793,0.0022950945,0.000078052675,0.0011118334,0.9699057,0.00044818575],"about_ca_topic_score_codex":0.00034415355,"about_ca_topic_score_gemma":0.000031589727,"teacher_disagreement_score":0.81869924,"about_ca_system_score_codex":0.00041437225,"about_ca_system_score_gemma":0.00030227748,"threshold_uncertainty_score":0.58625},"labels":[],"label_agreement":null}]}