{"meta":{"query_hash":"7e649050b413","filters":{"venue":"Journal of Construction in Developing Countries"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/7e649050b413","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Construction+in+Developing+Countries"},"results":[{"id":"W2405833297","doi":"10.21315/jcdc2016.21.1.4","title":"Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran","year":2016,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":93,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Cost overrun; Bidding; Schedule; Cash flow; Business; Duration (music); Actuarial science; Operations management; Construction industry; Economics; Finance; Marketing; Engineering; Construction engineering","score_opus":0.09891297228128945,"score_gpt":0.3655730460287283,"score_spread":0.26666007374743883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2405833297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99790776,0.00014884966,0.00050840405,0.00039279996,0.0000056796057,0.000013683379,0.00002847271,0.0000038585367,0.0009904229],"genre_scores_gemma":[0.9991841,0.00016262745,0.00036363147,0.00001879539,0.00000580124,0.0000059144295,0.000023225772,0.0000025445142,0.00023338688],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99716944,0.0006895139,0.0001925782,0.0002501238,0.00090055855,0.0007978484],"domain_scores_gemma":[0.98724073,0.004173213,0.0060607456,0.0002848563,0.0015358456,0.00070463755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032984882,0.00031885869,0.00022948111,0.0022771757,0.0015595566,0.0014326975,0.00091772084,0.0009178686,0.0011905442],"category_scores_gemma":[0.011572137,0.00037159794,0.000550011,0.0027497944,0.0010245948,0.0014265548,0.00097621686,0.0012367547,0.00011217162],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001703602,0.0002769455,0.9002302,0.00021705053,0.000070822454,0.009524456,0.027029578,0.011055366,0.001550941,0.0063290065,0.0015385472,0.04200667],"study_design_scores_gemma":[0.000026259475,0.00025505657,0.8238548,0.00013186998,0.00009776372,0.0043333825,0.13482383,0.019924203,0.0013808534,0.0029953008,0.01204868,0.0001280491],"about_ca_topic_score_codex":0.041777268,"about_ca_topic_score_gemma":0.055172883,"teacher_disagreement_score":0.041777268,"about_ca_system_score_codex":0.0051954864,"about_ca_system_score_gemma":0.0044993516,"threshold_uncertainty_score":0.08306819},"labels":[],"label_agreement":null},{"id":"W2599393935","doi":"10.21315/jcdc2016.21.1.9","title":"Finite Element Modelling of Cyclic Behaviour of Cold-Formed Steel Bolted Moment-Resisting Connections","year":2016,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Structural engineering; Dissipation; Finite element method; Moment (physics); Connection (principal bundle); Cold-formed steel; Beam (structure); Engineering; Element (criminal law); Shell (structure); Mechanical engineering; Physics","score_opus":0.017309747342057466,"score_gpt":0.23131508047612054,"score_spread":0.21400533313406306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2599393935","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72489166,0.00014554456,0.26710206,0.0000556996,0.000023060029,0.000057930734,0.00015702982,0.00044314054,0.007123884],"genre_scores_gemma":[0.97829926,0.00007130117,0.019180544,0.0000054846496,0.0000024266878,0.0000363014,0.00009708655,0.000035498542,0.0022720683],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985147,0.00003443367,0.0000098149985,0.000020970936,0.00006430725,0.000019014844],"domain_scores_gemma":[0.9996773,0.00015039109,0.000048975748,0.000047407982,0.00006139638,0.000014510073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003191482,0.00041078334,0.00030428212,0.00043907235,0.00021332971,0.00034918584,0.0008062265,0.0007359525,0.0013544422],"category_scores_gemma":[0.00081398146,0.00029776848,0.00040073157,0.00022180857,0.0005210857,0.0002954826,0.00021632697,0.0002782468,0.00030761986],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003374005,0.000023909859,0.0013552158,0.00003193804,0.000009861265,0.00007588008,0.00010027067,0.9693853,0.02296443,0.00086026714,0.00006473121,0.0050944085],"study_design_scores_gemma":[0.00000204583,0.000025048672,0.00064074167,0.000004174834,0.0000028031343,0.00001919219,0.000014806634,0.9962502,0.0026852346,0.00010496208,0.000247082,0.0000037306697],"about_ca_topic_score_codex":0.003572177,"about_ca_topic_score_gemma":0.0038041414,"teacher_disagreement_score":0.003572177,"about_ca_system_score_codex":0.00029998907,"about_ca_system_score_gemma":0.000414438,"threshold_uncertainty_score":0.007102728},"labels":[],"label_agreement":null},{"id":"W4226169875","doi":"10.21315/jcdc-08-20-0186","title":"Solutions to Overcome Integrated Project Delivery Implementation Barriers: A Meta-Synthesis Approach","year":2022,"lang":"en","type":"article","venue":"Journal of Construction in Developing Countries","topic":"Value Engineering and Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Integrated project delivery; Process management; Computer science; Project team; Context (archaeology); Construction industry; Pre-construction services; Project stakeholder; Engineering management; Coding (social sciences); Project charter; Knowledge management; Project planning; Project management; Construction engineering; Systems engineering; Business; Engineering","score_opus":0.03932731714222512,"score_gpt":0.25683877024065543,"score_spread":0.2175114530984303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226169875","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062156357,0.0865407,0.74243903,0.028928457,0.0012122433,0.026619399,0.0023152193,0.00063880795,0.049149755],"genre_scores_gemma":[0.19420974,0.021010526,0.76342267,0.001377804,0.00006066276,0.016849924,0.00090397336,0.00012074946,0.002043951],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.94674593,0.04165338,0.0045848615,0.0023064448,0.003865442,0.00084389007],"domain_scores_gemma":[0.91712505,0.06573396,0.0030027307,0.004633519,0.008814363,0.0006903692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.09707688,0.00235719,0.0026496628,0.019011028,0.0038289404,0.010935977,0.0045441915,0.002777546,0.004648288],"category_scores_gemma":[0.09942107,0.0016703813,0.004953863,0.013402343,0.004633,0.008882254,0.0069048125,0.0029002896,0.00041634188],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005154779,0.00052788854,0.003601936,0.080300726,0.0038868107,0.000709363,0.12045435,0.02009757,0.004109562,0.32235667,0.0069553354,0.43648428],"study_design_scores_gemma":[0.000663355,0.0012194887,0.0032890104,0.15636641,0.01263169,0.0006082732,0.15605472,0.032916818,0.008742656,0.34545165,0.2816797,0.00037626497],"about_ca_topic_score_codex":0.00613006,"about_ca_topic_score_gemma":0.010104715,"teacher_disagreement_score":0.09707688,"about_ca_system_score_codex":0.020643357,"about_ca_system_score_gemma":0.03107006,"threshold_uncertainty_score":0.5133977},"labels":[],"label_agreement":null}]}