{"meta":{"query_hash":"82f4c7c900e1","filters":{"venue":"Journal of Electrical Power Control and Automation (JEPCA)"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/82f4c7c900e1","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Electrical+Power+Control+and+Automation+%28JEPCA%29"},"results":[{"id":"W2907076185","doi":"10.33087/jepca.v1i1.2","title":"Listrik mikro hidro berdasarkan Potensi debit andalan sungai batanghari kota jambi","year":2018,"lang":"en","type":"article","venue":"Journal of Electrical Power Control and Automation (JEPCA)","topic":"Engineering and Technology Innovations","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Tributary; Hydroelectricity; Environmental science; Hydrology (agriculture); Electricity generation; Streamflow; Renewable energy; Watershed; Power station; Electric power; Drainage basin; Power (physics); Geology; Geography; Engineering; Computer science; Geotechnical engineering","score_opus":0.0031358157699652523,"score_gpt":0.1924124111381178,"score_spread":0.18927659536815256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907076185","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07862949,0.12823495,0.019776203,0.07196596,0.023864118,0.00036517263,0.0028523726,0.002812648,0.6714991],"genre_scores_gemma":[0.13906398,0.03473796,0.006584439,0.0032478387,0.0021061213,0.00009969171,0.000704509,0.0003492052,0.8131063],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99976975,0.000026521235,0.000013026669,0.00007422362,0.000067093824,0.000049443308],"domain_scores_gemma":[0.99968183,0.000055623153,0.000030453202,0.000013226331,0.00011425893,0.00010459503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031910714,0.0005947437,0.00046111373,0.0009268925,0.0015759758,0.0015805794,0.00038761095,0.00069400214,0.10153615],"category_scores_gemma":[0.0007473222,0.00024709362,0.00015344091,0.000505737,0.00036159402,0.0009478899,0.0012484251,0.0010443049,0.05744249],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039250136,0.00017774041,0.0043786145,0.0013389236,0.000025213627,0.0019643102,0.0021121916,0.00063248747,0.0103368135,0.016934317,0.47340918,0.48829776],"study_design_scores_gemma":[0.000007483838,0.00004456719,0.0030138076,0.00014305527,0.000009909956,0.001606198,0.0008455061,0.00038667087,0.0021769113,0.0010541364,0.9906921,0.000019682757],"about_ca_topic_score_codex":0.0036555228,"about_ca_topic_score_gemma":0.007009907,"teacher_disagreement_score":0.10153615,"about_ca_system_score_codex":0.0009196229,"about_ca_system_score_gemma":0.00125681,"threshold_uncertainty_score":0.33967227},"labels":[],"label_agreement":null},{"id":"W2908505011","doi":"10.33087/jepca.v1i1.5","title":"Analisis Awal Potensi Renewable Energy di Bawah Jembatan Aur Duri II Jambi","year":2018,"lang":"en","type":"article","venue":"Journal of Electrical Power Control and Automation (JEPCA)","topic":"Water and Land Management","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Environmental science; Hydropower; Renewable energy; Power station; Hydrology (agriculture); Streamflow; STREAMS; Electric power; Electricity; Electricity generation; Channel (broadcasting); Water resource management; Power (physics); Geology; Engineering; Computer science; Drainage basin; Geography; Geotechnical engineering; Electrical engineering","score_opus":0.003094190813273652,"score_gpt":0.18938698690634817,"score_spread":0.18629279609307453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2908505011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.979071,0.0018433216,0.000677475,0.0003036309,0.000044977744,0.00005741204,0.0021723157,0.000041021183,0.015788868],"genre_scores_gemma":[0.98884565,0.0008299146,0.00074266037,0.000067383255,0.000016636239,0.000034749963,0.001200029,0.000017960054,0.008245033],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9997837,0.000023671442,0.00001450315,0.000026400478,0.00010869005,0.00004299482],"domain_scores_gemma":[0.9997148,0.00006632964,0.000049766142,0.000019007568,0.00012739572,0.000022604445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022495685,0.00033594164,0.00025427542,0.003107185,0.0006969104,0.0011137028,0.00023752134,0.00031536652,0.005274332],"category_scores_gemma":[0.00055243995,0.00013521693,0.00022545847,0.003327975,0.00022756089,0.00041687247,0.0005088503,0.0003672976,0.0007475541],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003535753,0.00025392039,0.74163836,0.0013472525,0.0003415465,0.0033777864,0.0074545927,0.0020820152,0.03806728,0.0036079676,0.010159388,0.19131632],"study_design_scores_gemma":[0.0000047892745,0.000056046167,0.9516336,0.00012473472,0.000055987086,0.00052256894,0.008139519,0.00083660876,0.0037423042,0.00030023552,0.03456588,0.000017821994],"about_ca_topic_score_codex":0.01642907,"about_ca_topic_score_gemma":0.0572995,"teacher_disagreement_score":0.01642907,"about_ca_system_score_codex":0.00046539115,"about_ca_system_score_gemma":0.00030589759,"threshold_uncertainty_score":0.032666862},"labels":[],"label_agreement":null}]}