{"meta":{"query_hash":"82f4c7c900e1","filters":{"venue":"Journal of Electrical Power Control and Automation (JEPCA)"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/82f4c7c900e1","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Electrical+Power+Control+and+Automation+%28JEPCA%29"},"results":[{"id":"W2907076185","doi":"10.33087/jepca.v1i1.2","title":"Listrik mikro hidro berdasarkan Potensi debit andalan sungai batanghari kota jambi","year":2018,"lang":"en","type":"article","venue":"Journal of Electrical Power Control and Automation (JEPCA)","topic":"Engineering and Technology Innovations","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Tributary; Hydroelectricity; Environmental science; Hydrology (agriculture); Electricity generation; Streamflow; Renewable energy; Watershed; Power station; Electric power; Drainage basin; Power (physics); Geology; Geography; Engineering; Computer science; Geotechnical engineering","score_opus":0.0031358157699652523,"score_gpt":0.1924124111381178,"score_spread":0.18927659536815256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2907076185","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8643315,0.0023392863,0.124530345,0.0037293776,0.00096729223,0.0002178719,0.000029748431,0.0007288704,0.0031257332],"genre_scores_gemma":[0.9982703,0.000047867903,0.0011049819,0.00021200893,0.00024052392,0.00000212464,0.0000044510184,0.000024585062,0.00009316278],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881965,0.00002415577,0.0005274204,0.00011841596,0.00021357746,0.00029677822],"domain_scores_gemma":[0.99914783,0.000114341114,0.00014399055,0.00015074934,0.0003278753,0.00011519571],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024597713,0.00017870565,0.00032883824,0.00039081514,0.00011185731,0.000066352324,0.00015282068,0.00019918362,0.00005443917],"category_scores_gemma":[0.00024302582,0.00015640417,0.00008040918,0.0005226178,0.00006245346,0.00022004453,0.000011646467,0.00047437337,0.000019446928],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005221963,0.0008496671,0.012756822,0.00021527991,0.003359276,0.0005338392,0.0013340126,0.0056288177,0.46506757,0.041326404,0.27383807,0.19456805],"study_design_scores_gemma":[0.013280789,0.0038361833,0.18620718,0.00036713708,0.0006020087,0.0031221386,0.00012474715,0.6073419,0.01891792,0.009985438,0.15428573,0.0019288453],"about_ca_topic_score_codex":0.000002648466,"about_ca_topic_score_gemma":0.0000023152375,"teacher_disagreement_score":0.60171306,"about_ca_system_score_codex":0.00007044468,"about_ca_system_score_gemma":0.00003592564,"threshold_uncertainty_score":0.6377977},"labels":[],"label_agreement":null},{"id":"W2908505011","doi":"10.33087/jepca.v1i1.5","title":"Analisis Awal Potensi Renewable Energy di Bawah Jembatan Aur Duri II Jambi","year":2018,"lang":"en","type":"article","venue":"Journal of Electrical Power Control and Automation (JEPCA)","topic":"Water and Land Management","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Environmental science; Hydropower; Renewable energy; Power station; Hydrology (agriculture); Streamflow; STREAMS; Electric power; Electricity; Electricity generation; Channel (broadcasting); Water resource management; Power (physics); Geology; Engineering; Computer science; Drainage basin; Geography; Geotechnical engineering; Electrical engineering","score_opus":0.003094190813273652,"score_gpt":0.18938698690634817,"score_spread":0.18629279609307453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2908505011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.906042,0.00059791794,0.05632362,0.007027506,0.000659755,0.00024308183,0.000008927101,0.00009463463,0.029002568],"genre_scores_gemma":[0.99709344,0.000047214802,0.00015439751,0.0012571316,0.00020670217,0.0000015828191,0.0000017930589,0.000009830541,0.0012279043],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99852616,0.000088352965,0.00044248026,0.00018976863,0.00043693982,0.00031627572],"domain_scores_gemma":[0.9993066,0.00004241403,0.00026294542,0.00013300253,0.000059915525,0.00019512384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035082674,0.00015054943,0.00027876292,0.000117470554,0.0002599447,0.00007948425,0.0001751387,0.00007387489,0.0008133658],"category_scores_gemma":[0.000056899793,0.000106448155,0.00010571773,0.0002731522,0.00008156849,0.00036296874,0.0000716814,0.000113738715,0.00002245309],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017125967,0.0017362003,0.053312227,0.000027254013,0.0009686274,0.00036154964,0.0018353042,0.0047655543,0.120514035,0.0027839977,0.7188255,0.09315714],"study_design_scores_gemma":[0.0076775686,0.00496628,0.6372354,0.000057329155,0.00038135797,0.0003189013,0.00013936566,0.0681266,0.00624919,0.0058299033,0.26819637,0.0008217352],"about_ca_topic_score_codex":0.00037813027,"about_ca_topic_score_gemma":0.00007681233,"teacher_disagreement_score":0.58392316,"about_ca_system_score_codex":0.00009379975,"about_ca_system_score_gemma":0.000016519129,"threshold_uncertainty_score":0.8905785},"labels":[],"label_agreement":null}]}