{"meta":{"query_hash":"230842dbed34","filters":{"venue":"Journal of Energy Management and Technology"},"cohort_total":4,"direct_labels_cover":0,"predictions_cover":4,"exported":4,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/230842dbed34","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Energy+Management+and+Technology"},"results":[{"id":"W2787411904","doi":"10.22109/jemt.2017.46746","title":"A Risk-based Two-stage Stochastic Optimal Power Flow Considering the Impact of Multiple Operational Uncertainties","year":2017,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Electric Power System Optimization","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"CVAR; Expected shortfall; Stochastic programming; Electricity market; Procurement; Wind power; Electric power system; Mathematical optimization; Electricity; Reliability engineering; Electricity generation; Computer science; AC power; Risk management; Operations research; Engineering; Economics; Power (physics); Mathematics; Finance","score_opus":0.0068710864479442635,"score_gpt":0.22521368846407816,"score_spread":0.2183426020161339,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2787411904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012523618,0.00013074846,0.98499507,0.0001508423,0.000028439388,0.000058861173,0.00004943578,0.00007262544,0.001990313],"genre_scores_gemma":[0.81421703,0.00031410667,0.1801602,0.0000855319,0.00006596503,0.00025369273,0.00016114439,0.000077613135,0.004664611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931586,0.00032441065,0.00002703364,0.000104919316,0.0001384457,0.00008940431],"domain_scores_gemma":[0.99909794,0.00062244403,0.000090462265,0.000026625776,0.00011838584,0.000044123957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017385796,0.001089417,0.001434995,0.00076938496,0.00047672258,0.0011796408,0.0010799689,0.0017282737,0.0025140499],"category_scores_gemma":[0.0024916797,0.0010025469,0.0014636131,0.0007391115,0.00073879526,0.0011755829,0.0009530036,0.0015325214,0.00016577002],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011969046,0.000010469438,0.00007533712,0.000014979611,0.000012771409,0.00002233542,0.000008980711,0.9941544,0.00017952123,0.0026608652,0.00009486675,0.0027535674],"study_design_scores_gemma":[0.0000027284907,0.000011333692,0.000026899977,0.0000019676418,0.0000024501176,0.000004554006,0.000001912557,0.9987791,0.000059199287,0.0010400659,0.00006732769,0.0000024818373],"about_ca_topic_score_codex":0.010520108,"about_ca_topic_score_gemma":0.005200065,"teacher_disagreement_score":0.010520108,"about_ca_system_score_codex":0.001089402,"about_ca_system_score_gemma":0.002105607,"threshold_uncertainty_score":0.020917714},"labels":[],"label_agreement":null},{"id":"W2908412753","doi":"10.22109/jemt.2018.126045.1077","title":"Improved Forecasting of Short Term Electricity Demand by using of Integrated Data Preparation and Input Selection Methods","year":2019,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Energy Load and Power Forecasting","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Autoregressive integrated moving average; Normalization (sociology); Nonlinear autoregressive exogenous model; Parametric statistics; Selection (genetic algorithm); Term (time); Autoregressive model; Computer science; Model selection; Statistics; Econometrics; Time series; Mathematics; Artificial intelligence","score_opus":0.01825321272563487,"score_gpt":0.267966987677896,"score_spread":0.24971377495226113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2908412753","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10884658,0.00034198893,0.8864283,0.00019442302,0.00008965316,0.00007230918,0.00043942741,0.0015100883,0.0020772996],"genre_scores_gemma":[0.6863699,0.00049034745,0.30833116,0.000049844588,0.00006768779,0.00013749635,0.0016636061,0.00012192776,0.0027679082],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963284,0.00010004147,0.00003487136,0.00006486237,0.00013442601,0.00003291689],"domain_scores_gemma":[0.99950695,0.00020058357,0.000043818643,0.000054148863,0.00018398439,0.000010540864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091200176,0.0007120533,0.00066401967,0.0005449446,0.00020146831,0.0007375347,0.00047967472,0.00031041927,0.0013580692],"category_scores_gemma":[0.0021956186,0.00023979566,0.00054902217,0.0008940587,0.00010851627,0.0009186968,0.00045350354,0.00070153864,0.00040535792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026043248,0.000293392,0.010771412,0.00022676647,0.00014963819,0.00020445781,0.00015621822,0.3256096,0.025710031,0.0033633984,0.0024295985,0.630825],"study_design_scores_gemma":[0.000011433935,0.0000759128,0.0045285034,0.000014372913,0.000025268226,0.000024911069,0.000025010166,0.9858564,0.007128621,0.0008067458,0.0014859412,0.00001692053],"about_ca_topic_score_codex":0.0045746067,"about_ca_topic_score_gemma":0.0054630404,"teacher_disagreement_score":0.0045746067,"about_ca_system_score_codex":0.00021862444,"about_ca_system_score_gemma":0.0007280903,"threshold_uncertainty_score":0.009095967},"labels":[],"label_agreement":null},{"id":"W2921952589","doi":"10.22109/jemt.2019.119235.1064","title":"Robust Energy Management of a Microgrid with Uncertain Price, Renewable Generation, and Load using Taguchi’s Orthogonal Array Method","year":2019,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Microgrid; Renewable energy; Taguchi methods; Mathematical optimization; Robust optimization; Orthogonal array; Monte Carlo method; Computer science; Energy management; Reliability engineering; Energy (signal processing); Engineering; Mathematics; Statistics; Electrical engineering","score_opus":0.010841688308818301,"score_gpt":0.19922914772999809,"score_spread":0.1883874594211798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921952589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044066537,0.00015226107,0.953152,0.00006288004,0.000020263797,0.000049061244,0.000023695071,0.00014987748,0.0023234088],"genre_scores_gemma":[0.91965485,0.00017437023,0.078579575,0.00002889845,0.000012413254,0.00012911356,0.000029222088,0.000021625245,0.0013699998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996443,0.00013680231,0.000019227022,0.000059089853,0.00010566686,0.000034893386],"domain_scores_gemma":[0.99976546,0.00010827228,0.000053116783,0.000015647,0.000049799055,0.0000076929255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078264484,0.00078882417,0.00067823636,0.0003268353,0.000358592,0.0008281944,0.0004969621,0.0005331371,0.0008022246],"category_scores_gemma":[0.0007883549,0.0003573716,0.0007707862,0.00039391415,0.0004070701,0.0005192182,0.0004356125,0.0004104952,0.000098784476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032508404,0.000020566244,0.0002482991,0.00004064535,0.000025821495,0.000049245176,0.000029289125,0.978871,0.0051372456,0.0015855742,0.00008351672,0.013876386],"study_design_scores_gemma":[0.0000021452768,0.000028287654,0.000047179798,0.000001585274,0.0000064007418,0.0000053312306,0.0000057192974,0.99886227,0.00064753153,0.00032313605,0.00006709535,0.0000033503873],"about_ca_topic_score_codex":0.0029828388,"about_ca_topic_score_gemma":0.0024488939,"teacher_disagreement_score":0.0029828388,"about_ca_system_score_codex":0.00048752566,"about_ca_system_score_gemma":0.0006424669,"threshold_uncertainty_score":0.0059309006},"labels":[],"label_agreement":null},{"id":"W2930310024","doi":"10.22109/jemt.2019.143673.1116","title":"Fractional PR Control of a Grid Tied Flying Capacitor Inverter for PV Applications","year":2019,"lang":"en","type":"article","venue":"Journal of Energy Management and Technology","topic":"Microgrid Control and Optimization","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Control theory (sociology); Inverter; Maximum power point tracking; Capacitor; Photovoltaic system; Grid; Ripple; Controller (irrigation); Transformer; Engineering; Computer science; Voltage; Electrical engineering; Control (management); Mathematics","score_opus":0.0023134594314239473,"score_gpt":0.16202167897211842,"score_spread":0.15970821954069447,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2930310024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17651181,0.00075660297,0.8040472,0.00017327645,0.00025647826,0.0000871681,0.00009135635,0.0011220815,0.016954014],"genre_scores_gemma":[0.9808429,0.00011189094,0.01798651,0.000028535384,0.000020675272,0.000014461553,0.000019248477,0.000010030906,0.00096577895],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99993455,0.000007110203,0.000003497427,0.000017201219,0.000031082607,0.000006588015],"domain_scores_gemma":[0.9999552,0.000010329634,0.000010533036,0.000006756629,0.00001322422,0.0000040624823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007938672,0.00021972867,0.00021954146,0.00013531392,0.00027446303,0.0003901225,0.0005208808,0.0002076721,0.0012779179],"category_scores_gemma":[0.00017457413,0.0000721329,0.00016056695,0.00018590908,0.00016644491,0.00023609438,0.00013608448,0.0002518424,0.000111468835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059026823,0.00023859687,0.0012598106,0.00071526895,0.000121686826,0.0008269616,0.00036180994,0.21527447,0.3536399,0.020984573,0.0038001614,0.40218636],"study_design_scores_gemma":[0.00005386611,0.00038611938,0.0010760619,0.00001562523,0.000042422856,0.00031473162,0.000025351539,0.96856254,0.023711927,0.0020649289,0.0037267462,0.000019670762],"about_ca_topic_score_codex":0.0011224893,"about_ca_topic_score_gemma":0.0015641898,"teacher_disagreement_score":0.0012779179,"about_ca_system_score_codex":0.00017511762,"about_ca_system_score_gemma":0.00014304543,"threshold_uncertainty_score":0.0042750835},"labels":[],"label_agreement":null}]}