{"meta":{"query_hash":"46c513ad23e3","filters":{"venue":"Journal of Information Technology in Construction"},"cohort_total":40,"direct_labels_cover":1,"predictions_cover":40,"exported":40,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/46c513ad23e3","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Information+Technology+in+Construction"},"results":[{"id":"W135582993","doi":"","title":"Editorial - Use of Gaming Technology in Architecture, Engineering and Construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Architecture; Engineering; Multimedia; Visualization; Engineering management; Computer science","score_opus":0.0031696174758520644,"score_gpt":0.1802410623213675,"score_spread":0.17707144484551543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W135582993","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032084387,0.00031045082,0.018140791,0.000055153185,0.94889843,0.00023070352,0.000037959508,0.00017438103,0.00006773545],"genre_scores_gemma":[0.10236762,0.00593401,0.18031193,0.000007950082,0.71103597,0.0000749764,0.00012226797,0.000138013,0.00000726441],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974527,0.00002416194,0.0017840614,0.00012737201,0.00037065547,0.00024108384],"domain_scores_gemma":[0.9979411,0.00015261669,0.0010522106,0.00019813953,0.00061637524,0.00003960589],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0003370291,0.00030853244,0.00065246015,0.007478985,0.000029822006,0.000046171866,0.0002117087,0.0024640886,0.000008769424],"category_scores_gemma":[0.0010611474,0.0003261284,0.000075899625,0.0012197405,0.00037904852,0.0014411076,0.00004531391,0.0024801462,0.0000015401724],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047460076,0.000059831258,0.0070564277,0.0013284119,0.00041262896,0.000016191345,0.0010062086,0.014110174,0.0042465148,0.036494374,0.12749158,0.8073031],"study_design_scores_gemma":[0.006824582,0.0008514892,0.00037662935,0.00433947,0.00025239974,0.003382982,0.0036096484,0.006264548,0.032739557,0.055524584,0.88415504,0.0016790609],"about_ca_topic_score_codex":0.000022542177,"about_ca_topic_score_gemma":0.00001899204,"teacher_disagreement_score":0.805624,"about_ca_system_score_codex":0.00030374847,"about_ca_system_score_gemma":0.00019168535,"threshold_uncertainty_score":0.99991906},"labels":[],"label_agreement":null},{"id":"W1457225595","doi":"","title":"Validating ontologies in informatics systems: approaches and lessons learned for AEC","year":2014,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Benchmarking; Scope (computer science); Computer science; Construct (python library); Ontology; Dimension (graph theory); Data science; Set (abstract data type); Knowledge management; Informatics; Artificial intelligence; Software engineering; Engineering; Mathematics","score_opus":0.04730560788840749,"score_gpt":0.27561290686343337,"score_spread":0.22830729897502589,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1457225595","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2372993,0.00007174412,0.7588316,0.0029439686,0.00034316326,0.00014107495,5.402345e-7,0.000057719975,0.00031086162],"genre_scores_gemma":[0.80791444,0.00005430218,0.19198462,0.000025359135,0.000011002214,0.000007444851,6.4177004e-7,0.0000012758172,9.046007e-7],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877673,0.0000355522,0.0008736743,0.000051084262,0.000112185924,0.00015079057],"domain_scores_gemma":[0.9986933,0.00019995056,0.0008183633,0.00014385917,0.00012807577,0.000016474181],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010705153,0.00008330822,0.00024847488,0.0011559345,0.00005542729,0.00012047018,0.0003226479,0.00019256363,1.7493319e-7],"category_scores_gemma":[0.0010856014,0.00007060626,0.000025239493,0.00037117745,0.00012381426,0.0021767481,0.00007539992,0.0002301077,8.212095e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011033483,0.0000077973045,0.012757407,0.000085136824,0.000008409428,4.0707093e-7,0.0011603427,0.0014487983,0.00002454393,0.44055808,0.000018273216,0.5439198],"study_design_scores_gemma":[0.004075916,0.0006223611,0.010655727,0.00049478305,0.000020407375,0.002274895,0.06704501,0.6690238,0.00548619,0.23752956,0.0023600569,0.00041126736],"about_ca_topic_score_codex":0.000007862495,"about_ca_topic_score_gemma":0.000009806667,"teacher_disagreement_score":0.667575,"about_ca_system_score_codex":0.000067658366,"about_ca_system_score_gemma":0.000058684862,"threshold_uncertainty_score":0.28792396},"labels":[],"label_agreement":null},{"id":"W1472584441","doi":"","title":"Feasibility of In-Plane Articulation Monitoring of Excavator Arm Using Planar Marker Tracking","year":2015,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Excavator; Boom; Scalability; Process (computing); Benchmark (surveying); Task (project management); Engineering; Computer science; Simulation; Real-time computing; Systems engineering; Mechanical engineering","score_opus":0.04543859796117909,"score_gpt":0.26684375786283204,"score_spread":0.22140515990165294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1472584441","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99877316,0.000076329525,0.0005831856,0.000036455986,0.00034856616,0.000060800437,0.0000052931405,0.0000071551995,0.00010907556],"genre_scores_gemma":[0.99085414,0.000013111672,0.009110359,0.0000018099888,0.000015885089,7.075409e-8,0.0000036779797,6.204347e-7,3.203381e-7],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99893445,0.000045647987,0.0007239027,0.000035740297,0.00017575618,0.00008450111],"domain_scores_gemma":[0.9990113,0.000035588237,0.0006591087,0.0000589048,0.00020953006,0.000025581241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008096835,0.00005334989,0.00017258056,0.0004747079,0.000017249153,0.000008681176,0.000071842456,0.00011628099,0.000016515301],"category_scores_gemma":[0.00025723132,0.000044831682,0.000024050876,0.00042073464,0.0000805221,0.0010006754,0.000002898074,0.0001775832,0.0000012115515],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008586259,0.000008106617,0.96551317,0.000018506084,0.000004378169,0.0000014576896,0.0002837633,0.0035377522,0.0006453686,0.00003409297,0.0000011831188,0.029866371],"study_design_scores_gemma":[0.0005890093,0.000102962855,0.98080224,0.00013331068,0.0000054665984,0.00023217245,0.005922036,0.0024359138,0.008027769,0.0016917427,0.000006034533,0.000051367108],"about_ca_topic_score_codex":0.00012409856,"about_ca_topic_score_gemma":0.000057142246,"teacher_disagreement_score":0.029815005,"about_ca_system_score_codex":0.000032046228,"about_ca_system_score_gemma":0.000063234074,"threshold_uncertainty_score":0.1828183},"labels":[],"label_agreement":null},{"id":"W16601101","doi":"10.1073/pnas.0510337103","title":"APPLICATION OF GAMING ENGINES IN SIMULATION DRIVEN VISUALIZATION OF CONSTRUCTION OPERATIONS","year":2011,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Flexibility (engineering); Computer science; Representation (politics); Component (thermodynamics); Systems engineering; Human–computer interaction; Engineering; Data mining","score_opus":0.006411177422959225,"score_gpt":0.2237875179427445,"score_spread":0.2173763405197853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W16601101","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47919223,0.000043667274,0.5198269,0.000016646714,0.00037689306,0.00016007147,0.0000037454463,0.00004443248,0.00033543224],"genre_scores_gemma":[0.968321,0.000098222146,0.031529356,0.000002980783,0.000019877087,0.00000935721,0.000011593495,0.0000071434815,4.4964492e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998144,0.000028414299,0.0014927469,0.000061221115,0.00017136412,0.00010229796],"domain_scores_gemma":[0.9986634,0.000030350384,0.0005980974,0.00012488157,0.00056327827,0.000019949595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024075461,0.00011674618,0.000267992,0.0025771991,0.000025217987,0.000008623551,0.00011570334,0.00027776026,0.000021443655],"category_scores_gemma":[0.00012746922,0.00012446106,0.000051396517,0.0012413902,0.00017309927,0.0015952069,0.000010516122,0.00022332593,0.0000018384019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067576904,0.000048988197,0.10849656,0.00013159159,0.000040398754,4.66427e-7,0.0017116828,0.4952335,0.014588886,0.11549029,0.0000035980504,0.26418644],"study_design_scores_gemma":[0.0016234164,0.00018229689,0.025654806,0.00028967127,0.000040661587,0.00025765973,0.0060361763,0.77677184,0.17792386,0.010892485,0.00009214014,0.00023499154],"about_ca_topic_score_codex":0.000023822675,"about_ca_topic_score_gemma":0.000032589414,"teacher_disagreement_score":0.4891288,"about_ca_system_score_codex":0.00013258723,"about_ca_system_score_gemma":0.00005817341,"threshold_uncertainty_score":0.5075375},"labels":[],"label_agreement":null},{"id":"W2096208965","doi":"","title":"Emerging technologies in a tele-collaborative design studio between the Pennsylvania State University and Carleton University","year":2008,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Design Education and Practice","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University; McGill University","funders":"","keywords":"Studio; Multimedia; Computer science; Telecommunications","score_opus":0.008413984081638327,"score_gpt":0.20139482014870957,"score_spread":0.19298083606707125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096208965","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9507886,0.00012232567,0.0467865,0.0015085639,0.00015396888,0.00016688315,0.0000033960423,0.000111504596,0.00035823073],"genre_scores_gemma":[0.99028134,0.0017085358,0.007991387,0.000004700076,0.0000052118735,2.4862496e-7,5.174105e-7,0.0000023947275,0.00000568216],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.999464,0.00006031107,0.0002552946,0.000039508406,0.000083588646,0.000097339864],"domain_scores_gemma":[0.9994083,0.00012825016,0.00023138027,0.00007341676,0.00014520694,0.000013423525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033531684,0.00007228603,0.00013562839,0.0011738051,0.00010008056,0.000011003305,0.00014215398,0.00011863114,0.0000030306212],"category_scores_gemma":[0.00014520835,0.00006734103,0.000012708125,0.0012359968,0.00019690674,0.0013946973,0.0000243805,0.00045584148,0.0000027425208],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003132268,0.000042011892,0.37110958,0.00006306501,0.00023456816,0.00015999693,0.018537344,0.022257745,0.00094840484,0.00454056,0.0014379156,0.5803556],"study_design_scores_gemma":[0.0072689126,0.00062212284,0.23621204,0.00028649578,0.00014765252,0.004738324,0.6169228,0.0066094734,0.02374252,0.009137838,0.0933634,0.00094841525],"about_ca_topic_score_codex":0.000007757185,"about_ca_topic_score_gemma":0.000009487146,"teacher_disagreement_score":0.59838545,"about_ca_system_score_codex":0.00023695313,"about_ca_system_score_gemma":0.00010485218,"threshold_uncertainty_score":0.27460873},"labels":[],"label_agreement":null},{"id":"W2099215784","doi":"","title":"E-PROCUREMENT IN THE ATLANTIC CANADIAN AEC INDUSTRY","year":2006,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Procurement; Variety (cybernetics); Presentation (obstetrics); Fragmentation (computing); Business; Housing industry; Engineering; Critical success factor; Engineering management; Process management; Marketing; Industrial organization; Computer science","score_opus":0.022503341082543097,"score_gpt":0.29444766371237796,"score_spread":0.27194432262983487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099215784","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9808004,0.000029817116,0.0013850103,0.009840191,0.00070799456,0.00018072076,0.000001397736,0.000011779389,0.0070427246],"genre_scores_gemma":[0.9984931,0.000016024602,0.0012366108,0.00017462329,0.000052745014,0.0000038279927,0.0000016945987,0.0000014376991,0.000019965528],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9978221,0.000061410654,0.0012710686,0.00006959085,0.00058986235,0.00018595776],"domain_scores_gemma":[0.9986324,0.00007922165,0.0007674605,0.00019682462,0.0003005793,0.000023562041],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026580854,0.00008347879,0.00015947419,0.0046717753,0.00009816274,0.00015752423,0.0005544608,0.00025139292,0.00013867802],"category_scores_gemma":[0.0004513462,0.00005654797,0.000053563548,0.0026481058,0.00015455102,0.0016312867,0.00002635725,0.0007328769,0.000043953263],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015001036,0.000010499215,0.7763933,0.0000033528636,0.0000049260016,0.0000082138495,0.00022330461,0.00047638422,0.00001043623,0.04314098,0.0027410768,0.17697255],"study_design_scores_gemma":[0.0027417957,0.00020670885,0.4841584,0.00013570563,0.00002510836,0.0034268368,0.037588157,0.0023475012,0.000891372,0.2581936,0.20992355,0.00036124457],"about_ca_topic_score_codex":0.004537677,"about_ca_topic_score_gemma":0.024569249,"teacher_disagreement_score":0.29223487,"about_ca_system_score_codex":0.00019723878,"about_ca_system_score_gemma":0.0002586907,"threshold_uncertainty_score":0.9932298},"labels":[],"label_agreement":null},{"id":"W2106384226","doi":"","title":"CASE STUDIES ON THE USE OF INFORMATION TECHNOLOGY IN THE CANADIAN CONSTRUCTION INDUSTRY","year":2004,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Documentation; Compendium; Engineering; Engineering management; Workflow; Architecture; Computer science; World Wide Web","score_opus":0.01800397573966054,"score_gpt":0.2245304942905523,"score_spread":0.20652651855089177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106384226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98887813,0.000049212824,0.0031899402,0.0059864456,0.0011964537,0.00031151526,0.000013381384,0.000065759785,0.00030918888],"genre_scores_gemma":[0.994971,0.00009644773,0.0047217174,0.00015704911,0.000026181831,0.000019285864,0.0000035910775,0.0000043371765,4.3514078e-7],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99825466,0.00004141364,0.0012450885,0.000049490423,0.0002244241,0.0001849359],"domain_scores_gemma":[0.99855286,0.00008471139,0.0006496943,0.00021412114,0.00047037244,0.000028266863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005185596,0.0001544529,0.00023009058,0.0037307378,0.00015857462,0.00006992761,0.0002117546,0.00069358025,0.000009153671],"category_scores_gemma":[0.0006204105,0.000107279964,0.00005029744,0.0019051998,0.0005764673,0.0022746488,0.000014249049,0.001506877,0.0000082435845],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004293301,0.000017716591,0.009207025,0.000055747023,0.00010393641,0.00005767621,0.003190016,0.07790432,0.00012800314,0.7314002,0.00027147282,0.17762098],"study_design_scores_gemma":[0.0064397925,0.0010228821,0.0039192806,0.0014743082,0.00016578082,0.19693464,0.3475502,0.008244864,0.07012649,0.35182577,0.011250425,0.0010455563],"about_ca_topic_score_codex":0.00054134487,"about_ca_topic_score_gemma":0.004465356,"teacher_disagreement_score":0.37957442,"about_ca_system_score_codex":0.0006536573,"about_ca_system_score_gemma":0.0002638141,"threshold_uncertainty_score":0.65467143},"labels":[],"label_agreement":null},{"id":"W2145294919","doi":"","title":"Integrating Decision Support System (DSS) and Building Information Modeling (BIM) to Optimize the Selection of Sustainable Building Components","year":2015,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Multiple-criteria decision analysis; Decision support system; Sustainability; Conceptual design; TOPSIS; Engineering; Systems engineering; Sustainable design; Building design; Integrated design; Computer science; Risk analysis (engineering); Management science; Process management; Construction engineering; Architectural engineering; Operations research; Operations management; Civil engineering; Business; Scheduling (production processes)","score_opus":0.0072608382084449336,"score_gpt":0.216921002667138,"score_spread":0.20966016445869307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145294919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47768256,0.000021591306,0.52137417,0.00009241872,0.0004249696,0.00015581779,0.0000012766118,0.0000647975,0.00018237652],"genre_scores_gemma":[0.8853449,0.000021953827,0.11457137,0.000013946203,0.000029749684,0.000009115314,0.000002732092,0.000005567436,6.3748297e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815553,0.000028019653,0.0012868532,0.0000545735,0.0002940849,0.00018094847],"domain_scores_gemma":[0.9982587,0.000044318807,0.00052977365,0.0001034184,0.0010027345,0.00006107244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096340256,0.00013949163,0.0002525881,0.0019231878,0.00010966364,0.000103339444,0.00016014048,0.00021983613,0.0000029994571],"category_scores_gemma":[0.00035815517,0.00011442006,0.000042798143,0.0009873251,0.00006383689,0.0033963493,0.000044352033,0.00042776545,0.0000023281498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015840166,0.000008627574,0.002822515,0.00014987272,0.000050591312,0.0000012785852,0.0014541697,0.62142587,0.0025366412,0.15585078,0.00013104694,0.21541019],"study_design_scores_gemma":[0.0012564514,0.00018187259,0.00019862092,0.00039282723,0.000031934313,0.0019273104,0.054749273,0.91982305,0.01500843,0.0055362447,0.000718057,0.00017594935],"about_ca_topic_score_codex":0.000032001335,"about_ca_topic_score_gemma":0.000003650462,"teacher_disagreement_score":0.40766236,"about_ca_system_score_codex":0.00049920875,"about_ca_system_score_gemma":0.000096486234,"threshold_uncertainty_score":0.46659145},"labels":[],"label_agreement":null},{"id":"W2154614316","doi":"","title":"COMPUTER-AIDED MODELING APPLIED TO ARCHITECTURAL KNOW-HOW: THE GOTHIC ROSE WINDOW","year":2006,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Architecture and Art History Studies","field":"Arts and Humanities","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"GRASP; TRACE (psycholinguistics); Window (computing); Process (computing); Computer science; Software; Interface (matter); Computer Aided Design; Software engineering; Engineering; Human–computer interaction; Architectural engineering; World Wide Web; Programming language","score_opus":0.008542302820292622,"score_gpt":0.1852186608017844,"score_spread":0.17667635798149178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154614316","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8670364,0.00020949137,0.109171264,0.015713936,0.0015001859,0.00034539722,0.0000058939086,0.00012173917,0.005895681],"genre_scores_gemma":[0.99406725,0.000007815534,0.0051874206,0.00028542135,0.0004071689,0.000005767539,0.0000020250404,0.0000043178084,0.00003283602],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991164,0.000017860779,0.00051081815,0.000054664604,0.00015379758,0.00014642069],"domain_scores_gemma":[0.9993296,0.000034630713,0.00034440742,0.00010363128,0.00017088889,0.000016786638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002041693,0.0001098301,0.00018834899,0.0008271446,0.00033952133,0.000068585,0.00018210647,0.00006345057,0.0000137925135],"category_scores_gemma":[0.000026424916,0.00007394208,0.000056408342,0.00013126987,0.00030888908,0.00037648957,0.000048713573,0.0004025264,0.000014144491],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001372505,0.00003109906,0.00053478277,0.000029885521,0.0000631931,0.000003547372,0.029520737,0.067496374,0.0003628784,0.3767591,0.0020684828,0.5229927],"study_design_scores_gemma":[0.0059097055,0.0013752958,0.0026338967,0.0005848969,0.00017236761,0.0029244483,0.092083074,0.03786335,0.0050583556,0.3550114,0.4949264,0.0014568408],"about_ca_topic_score_codex":0.000018671451,"about_ca_topic_score_gemma":0.0001804733,"teacher_disagreement_score":0.5215358,"about_ca_system_score_codex":0.00007566254,"about_ca_system_score_gemma":0.000032100586,"threshold_uncertainty_score":0.30152705},"labels":[],"label_agreement":null},{"id":"W2164195028","doi":"","title":"AUTOMATED RETRIEVAL OF PROJECT THREE-DIMENSIONAL CAD OBJECTS IN RANGE POINT CLOUDS TO SUPPORT AUTOMATED DIMENSIONAL QA/QC","year":2008,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"CAD; Point cloud; Computer science; Rework; Segmentation; Scanner; Quality (philosophy); Quality assurance; Engineering drawing; Data mining; Artificial intelligence; Engineering","score_opus":0.014716922648968967,"score_gpt":0.23792297303175144,"score_spread":0.2232060503827825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164195028","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984922,0.000040326835,0.000037010086,0.00026666775,0.0005144908,0.00021610575,0.00003887346,0.00019382672,0.00020053501],"genre_scores_gemma":[0.9935085,0.000013288208,0.006341661,0.00007025351,0.000018271663,5.836597e-7,0.00004105683,0.0000021475273,0.000004193297],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9981208,0.000069191985,0.0010820935,0.000093447765,0.00040782502,0.00022664279],"domain_scores_gemma":[0.9988478,0.00006976962,0.0005996906,0.00010391078,0.00032399263,0.00005487536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000758169,0.00013550953,0.00033241962,0.001272896,0.000085699576,0.0000123667105,0.00016574613,0.0002679013,0.00012131837],"category_scores_gemma":[0.0003183667,0.00010857891,0.00005973908,0.001398823,0.00018908457,0.0009075475,0.000017616085,0.0003925435,0.000035361438],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008592343,0.000044901746,0.9729842,0.000039138817,0.000034675544,0.00011557377,0.0009123457,0.009270166,0.0007592477,0.00006390607,0.0015021794,0.013414416],"study_design_scores_gemma":[0.002215566,0.0012486575,0.93029815,0.000208417,0.0000114896975,0.006424466,0.00096108654,0.05407647,0.003797458,0.00043041003,0.00008951663,0.0002383078],"about_ca_topic_score_codex":0.00032614692,"about_ca_topic_score_gemma":0.0005227243,"teacher_disagreement_score":0.0448063,"about_ca_system_score_codex":0.000048645845,"about_ca_system_score_gemma":0.0003553947,"threshold_uncertainty_score":0.44277194},"labels":[],"label_agreement":null},{"id":"W2583128632","doi":"","title":"Editorial - Technology Strategies for Collaborative Working","year":2010,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interoperability; Context (archaeology); Productivity; Workforce; Business; Information and Communications Technology; Knowledge management; Best practice; Engineering; Process management; Engineering management; Management; Political science; Economic growth; Computer science; Economics","score_opus":0.003260751857332548,"score_gpt":0.21704751225111155,"score_spread":0.213786760393779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2583128632","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006010565,0.00021811877,0.03938207,0.00020313555,0.9582873,0.00032743783,0.00006743692,0.00026924445,0.00064418465],"genre_scores_gemma":[0.007277311,0.0005581005,0.028175645,0.000004535572,0.96376383,0.00008676988,0.00009360448,0.000034326295,0.000005887137],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977237,0.000016218179,0.0014643512,0.00011153144,0.00042600976,0.00025816893],"domain_scores_gemma":[0.9962322,0.00017562683,0.0012005501,0.00020090486,0.0021549973,0.000035733476],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0004264796,0.0003040752,0.0005586302,0.0032428526,0.00010114883,0.00017425756,0.0003819235,0.0044490793,0.000013630184],"category_scores_gemma":[0.00080298434,0.0003052424,0.0001067079,0.0013792663,0.0003552439,0.0016214697,0.000024475243,0.0032461574,0.000006607041],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000096345975,0.000008106761,0.00004525178,0.000087823995,0.00009402374,8.3073667e-7,0.00013997211,0.000524332,0.00046949537,0.024103327,0.843502,0.1309285],"study_design_scores_gemma":[0.0012002825,0.00017253216,9.2897665e-7,0.00022492453,0.00004564003,0.00009197215,0.0048505487,0.0002752601,0.0022393386,0.052545935,0.93809897,0.00025369594],"about_ca_topic_score_codex":0.000001838422,"about_ca_topic_score_gemma":0.000035748177,"teacher_disagreement_score":0.1306748,"about_ca_system_score_codex":0.00035378634,"about_ca_system_score_gemma":0.0009707928,"threshold_uncertainty_score":0.99994},"labels":[],"label_agreement":null},{"id":"W2989704363","doi":"10.36680/j.itcon.2019.025","title":"A lean approach to optimize BIM information flow using value stream mapping","year":2019,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Value stream mapping; Building information modeling; Identification (biology); Process (computing); Productivity; Lean construction; Architecture; Process management; Engineering; Systems engineering; Information flow; Lean manufacturing; Computer science; Construction engineering; Knowledge management; Manufacturing engineering; Construction industry; Operations management","score_opus":0.0057682021033280215,"score_gpt":0.18820795976969387,"score_spread":0.18243975766636586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989704363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4783896,0.000019807687,0.51703644,0.00009659002,0.001210292,0.00022997106,0.000004964212,0.00013093544,0.0028814278],"genre_scores_gemma":[0.7468155,0.00002871773,0.2530303,0.00005583116,0.000044208682,0.000005542107,0.00001113744,0.0000068850914,0.0000018775698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99848396,0.00001298485,0.0010403155,0.00005486663,0.00022671602,0.00018117842],"domain_scores_gemma":[0.99908227,0.00001454782,0.00039935354,0.0001532574,0.0003017808,0.000048795562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028389605,0.00015001619,0.00024728008,0.0027795571,0.000049839997,0.000078227706,0.00016835133,0.00029920205,0.000026214757],"category_scores_gemma":[0.00006935179,0.00014952029,0.000065072185,0.0011149053,0.00005132529,0.0037267362,0.000022517575,0.00046957302,0.000056444132],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003179981,0.0000101301075,0.0025439668,0.00007405871,0.000042940985,2.8839287e-7,0.00084784394,0.634569,0.0008135574,0.023150446,0.00008533997,0.3378306],"study_design_scores_gemma":[0.0018219287,0.00012278308,0.00073072914,0.00026982083,0.000024633853,0.001998511,0.014633805,0.9601652,0.009398032,0.0046821735,0.0057797567,0.00037263706],"about_ca_topic_score_codex":0.000006205401,"about_ca_topic_score_gemma":5.9052616e-7,"teacher_disagreement_score":0.33745798,"about_ca_system_score_codex":0.0003855094,"about_ca_system_score_gemma":0.00008453846,"threshold_uncertainty_score":0.609726},"labels":[],"label_agreement":null},{"id":"W2993682673","doi":"10.36680/j.itcon.2019.031","title":"From BIM to VR: defining a level of detail to guide virtual reality narratives","year":2019,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Virtual reality; Building information modeling; Cultural heritage; Procurement; Narrative; Augmented reality; Process (computing); Engineering; Architectural engineering; Computer science; Human–computer interaction; Archaeology; Business; Geography; Operations management; Art","score_opus":0.026527357439620664,"score_gpt":0.2543996283394094,"score_spread":0.2278722708997887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2993682673","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99132127,0.000020813357,0.0059896456,0.0008603876,0.0004453842,0.00008583427,0.00007188819,0.000015530806,0.0011892538],"genre_scores_gemma":[0.97575283,0.0000072321363,0.024108926,0.000086999615,0.000016462385,2.6906457e-7,0.000012785488,7.832084e-7,0.000013687749],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99895066,0.000041848172,0.0006689949,0.000056770903,0.00017495197,0.00010676887],"domain_scores_gemma":[0.9992132,0.000056767865,0.00040337187,0.00009346136,0.00018806489,0.000045139324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048037237,0.00006991997,0.00019545527,0.0005024613,0.00003655269,0.00002020893,0.00016151872,0.0001186537,0.00019757272],"category_scores_gemma":[0.00026310343,0.000055909815,0.000033645774,0.00051136967,0.000051830368,0.000771431,0.000011735775,0.00019243067,0.00011886673],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013259627,0.00000687426,0.5767999,0.00000842912,0.00002233016,0.0000013369726,0.0037290582,0.0045161718,0.0011321891,0.0011648929,0.00029345823,0.4121927],"study_design_scores_gemma":[0.001027685,0.0011657809,0.8774949,0.00029991945,0.0000100106145,0.0002588774,0.095074974,0.0007676679,0.0100625,0.008295755,0.0052736006,0.00026833368],"about_ca_topic_score_codex":0.00045643887,"about_ca_topic_score_gemma":0.0005689391,"teacher_disagreement_score":0.4119244,"about_ca_system_score_codex":0.000018588182,"about_ca_system_score_gemma":0.00007027458,"threshold_uncertainty_score":0.22799361},"labels":[],"label_agreement":null},{"id":"W3005434831","doi":"10.36680/j.itcon.2020.005","title":"Risk quantification using fuzzy-based Monte Carlo simulation","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Monte Carlo method; Cost estimate; Cost contingency; Computer science; Variance (accounting); Contingency; Contingency table; Fuzzy logic; Covariance matrix; Estimation; Data mining; Econometrics; Operations research; Reliability engineering; Statistics; Mathematical optimization; Algorithm; Mathematics; Engineering; Machine learning; Artificial intelligence","score_opus":0.07772291270651605,"score_gpt":0.3542710614909876,"score_spread":0.27654814878447154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005434831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68593514,0.000024092365,0.31092536,0.0021367946,0.0005958482,0.00015841807,0.000005600773,0.000044312874,0.00017444747],"genre_scores_gemma":[0.97739005,0.000023169629,0.022372121,0.00014278124,0.00006346663,0.0000013770499,0.00000118772,0.0000036682918,0.0000021842432],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997224,0.000101225545,0.0017224954,0.00012638644,0.0006884262,0.00013748562],"domain_scores_gemma":[0.9959543,0.00019182145,0.0026344985,0.00021457045,0.00095433125,0.00005050944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015892554,0.00011677897,0.00026101887,0.0025068054,0.00014434579,0.00015855188,0.00038155963,0.00018248428,0.000066908964],"category_scores_gemma":[0.002836199,0.000101500074,0.00009577236,0.0027297097,0.00016514011,0.003045758,0.000041212126,0.00042203008,0.000048709342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001387634,0.0000085100355,0.13265713,0.000008276724,0.000012788057,0.0000010436082,0.0003132781,0.5313538,0.00017176145,0.001595547,0.000087037806,0.33365208],"study_design_scores_gemma":[0.0011225356,0.00012446134,0.006422318,0.00002858396,0.0000260114,0.000052817777,0.0036232064,0.9752129,0.0020555647,0.006462978,0.004732809,0.00013584853],"about_ca_topic_score_codex":0.000010019849,"about_ca_topic_score_gemma":0.0000042539264,"teacher_disagreement_score":0.44385907,"about_ca_system_score_codex":0.00010812954,"about_ca_system_score_gemma":0.00015336642,"threshold_uncertainty_score":0.4139053},"labels":[],"label_agreement":null},{"id":"W3035817401","doi":"10.36680/j.itcon.2020.019","title":"Change management practices for adopting new technologies in the design and construction industry","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Change management (ITSM); Context (archaeology); Change order; Business; Order (exchange); Critical success factor; Knowledge management; Best practice; Marketing; Operations management; Process management; Engineering; Computer science; Project management; Program management; Management; OPM3; Economics","score_opus":0.0348342904175412,"score_gpt":0.25000134206153457,"score_spread":0.21516705164399336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035817401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20272772,0.0007521214,0.7686825,0.024561087,0.0010181644,0.0013404379,0.0000039647143,0.00041408086,0.0004999665],"genre_scores_gemma":[0.752006,0.0007161146,0.24701025,0.00012778326,0.000083032195,0.000048007976,0.0000019154515,0.0000061758274,7.1075243e-7],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99911505,0.000022496703,0.0005713948,0.000059403126,0.00011403203,0.000117600466],"domain_scores_gemma":[0.99919814,0.000065085515,0.00056624704,0.000069866954,0.00008238097,0.000018265171],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034475056,0.0001024085,0.00014664905,0.00079763425,0.000048632486,0.00006162735,0.00015059006,0.0003663468,0.0000030365438],"category_scores_gemma":[0.00024598846,0.000084351486,0.000023974731,0.00072424044,0.00011676908,0.0015910694,0.000016236203,0.0006678603,0.0000011342551],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047856774,0.0000036254637,0.0052791876,0.00006931188,0.000022907248,0.0000019442116,0.00079274457,0.0010141727,0.00008898488,0.03060876,0.00015795443,0.9619126],"study_design_scores_gemma":[0.011373003,0.0015254463,0.007856544,0.0012119409,0.0002932865,0.007413216,0.5903031,0.11928527,0.03184792,0.14982148,0.07780089,0.0012678581],"about_ca_topic_score_codex":0.0000026689195,"about_ca_topic_score_gemma":0.0000022331474,"teacher_disagreement_score":0.9606447,"about_ca_system_score_codex":0.000065424545,"about_ca_system_score_gemma":0.000028208471,"threshold_uncertainty_score":0.3439754},"labels":[],"label_agreement":null},{"id":"W3035916000","doi":"10.36680/j.itcon.2020.018","title":"A review of augmented reality applied to underground construction","year":2020,"lang":"en","type":"review","venue":"Journal of Information Technology in Construction","topic":"Augmented Reality Applications","field":"Computer Science","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Augmented reality; Construction industry; Visualization; State (computer science); Construction engineering; Computer science; Engineering; Data science; Risk analysis (engineering); Engineering management; Systems engineering; Business; Human–computer interaction; Artificial intelligence","score_opus":0.02433877903417433,"score_gpt":0.31557656405609397,"score_spread":0.29123778502191966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035916000","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[5.232923e-7,0.45281333,0.542679,0.0027961426,0.00030990705,0.0008604038,0.00001744842,0.00007223695,0.00045097969],"genre_scores_gemma":[0.000018115987,0.9319172,0.06769755,0.00024477587,0.000032558528,0.00005420586,0.000027018077,0.00000779538,7.6674206e-7],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99572796,0.0001198801,0.0033240223,0.0002086976,0.00042119407,0.00019822904],"domain_scores_gemma":[0.9934605,0.000106436484,0.005150355,0.00062217534,0.0005596838,0.0001008655],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00087896554,0.00029152585,0.0016247629,0.002254938,0.000063164414,0.000047582587,0.0012003067,0.0004922935,0.000009648586],"category_scores_gemma":[0.00042473644,0.00026721408,0.00026567566,0.004222186,0.00023235721,0.0010052853,0.0002683324,0.0009016361,0.00003448963],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041529515,0.00001772447,0.0000012778136,0.0113549195,0.00007844066,0.0000012443614,0.000032584845,0.000008417354,0.0000016720094,0.113724,0.000605635,0.87416995],"study_design_scores_gemma":[0.00036907187,0.00011514314,0.0000023937537,0.039580055,0.00022018098,0.0028796087,0.00020354871,0.00007797405,0.000064215186,0.009729712,0.9464994,0.00025871297],"about_ca_topic_score_codex":0.000004777489,"about_ca_topic_score_gemma":0.0000012311356,"teacher_disagreement_score":0.94589376,"about_ca_system_score_codex":0.0006643381,"about_ca_system_score_gemma":0.00089911884,"threshold_uncertainty_score":0.999978},"labels":[],"label_agreement":null},{"id":"W3083778987","doi":"10.36680/j.itcon.2020.024","title":"Construction 4.0: a survey of research trends","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Digitization; Structuring; Construction industry; Quality (philosophy); Engineering; Emerging technologies; Industry 4.0; Construction management; Construction engineering; Business; Engineering management; Computer science; Civil engineering; Telecommunications","score_opus":0.025717033543118405,"score_gpt":0.27746792897006844,"score_spread":0.25175089542695006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3083778987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9316183,0.0002276719,0.06078934,0.0017513225,0.0016049228,0.00013679352,0.000028674003,0.00019423832,0.0036487798],"genre_scores_gemma":[0.9909372,0.00014208238,0.008845727,0.000013767242,0.000043773893,0.0000024738372,0.0000081389035,0.0000056420677,0.0000012349242],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983929,0.00006909128,0.0010470015,0.00005395378,0.00029493583,0.00014215856],"domain_scores_gemma":[0.99846846,0.00006190759,0.00037816723,0.000098236116,0.00094528013,0.000047957918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006747385,0.00009355283,0.00024677758,0.0025899867,0.000039174804,0.000023467044,0.0001663283,0.0002746938,0.00007064704],"category_scores_gemma":[0.00043240146,0.00009245958,0.000046789304,0.0030337253,0.00037773134,0.0010526679,0.000017103006,0.0007015585,0.000009996494],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013461964,0.000011142846,0.06227644,0.0000775453,0.000056075798,0.0000018410508,0.0005360654,0.002333668,0.0026707316,0.028849714,0.00090254867,0.9021496],"study_design_scores_gemma":[0.012244031,0.0030162786,0.26326495,0.0010662489,0.000125566,0.008501894,0.045389295,0.10095512,0.48902923,0.055754784,0.01914252,0.0015100733],"about_ca_topic_score_codex":0.000016749435,"about_ca_topic_score_gemma":0.000013581962,"teacher_disagreement_score":0.90063953,"about_ca_system_score_codex":0.00011120235,"about_ca_system_score_gemma":0.00008970691,"threshold_uncertainty_score":0.37703922},"labels":[],"label_agreement":null},{"id":"W3127643406","doi":"10.36680/j.itcon.2021.002","title":"Open access to Construction IT research articles – developments over the past 25 years","year":2021,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Intellectual Capital and Performance Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Dozen; Publishing; Quarter (Canadian coin); Quality (philosophy); Business model; Engineering; Library science; Political science; Engineering ethics; World Wide Web; Business; History; Computer science; Marketing","score_opus":0.04679358624725741,"score_gpt":0.331948027033694,"score_spread":0.2851544407864366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127643406","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9812782,0.000015936825,0.0011565706,0.011977004,0.0004844512,0.0001477159,7.3914106e-7,0.000014457458,0.004924937],"genre_scores_gemma":[0.9963303,0.0000522851,0.0019514498,0.0014475086,0.00017169816,0.000008377558,0.0000050255117,0.0000037681843,0.000029570148],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99875605,0.000018027924,0.00064000563,0.00007387797,0.00033400825,0.00017801132],"domain_scores_gemma":[0.99829465,0.000038344024,0.0004371708,0.00013499756,0.0010849204,0.000009945001],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.001028179,0.00007248887,0.00014875374,0.0019605362,0.0002048711,0.0011056158,0.00073302136,0.00010010699,0.00037830908],"category_scores_gemma":[0.000621676,0.00005666784,0.00003812394,0.0033035798,0.00015070799,0.007022476,0.0006826519,0.0003924564,0.00019798522],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017227825,0.000048310896,0.30752665,0.000053457377,0.00010279289,0.00001689064,0.00077386387,0.00035591185,0.00042108938,0.050109703,0.02842238,0.61199665],"study_design_scores_gemma":[0.002751309,0.00011320683,0.34814826,0.0005139946,0.0000994246,0.0011247678,0.05961755,0.0021065169,0.012876425,0.11561924,0.4564519,0.00057741744],"about_ca_topic_score_codex":0.000063816165,"about_ca_topic_score_gemma":0.00009472696,"teacher_disagreement_score":0.61141926,"about_ca_system_score_codex":0.00010644224,"about_ca_system_score_gemma":0.00012476585,"threshold_uncertainty_score":0.99993134},"labels":[{"model":"gemma","categories":["metaresearch","open_science"],"domain":"reporting","study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics","scholarly_communication","open_science"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"medium"}],"label_agreement":"split"},{"id":"W3156421604","doi":"10.36680/j.itcon.2021.029","title":"Ontology-based approach to data exchanges for robot navigation on construction sites","year":2021,"lang":"en","type":"preprint","venue":"Journal of Information Technology in Construction","topic":"Modular Robots and Swarm Intelligence","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Ontology; Interoperability; Robot; Building information modeling; Human–computer interaction; Software engineering; Systems engineering; Database; World Wide Web; Artificial intelligence; Engineering","score_opus":0.03869984458902712,"score_gpt":0.2740566149552088,"score_spread":0.23535677036618166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156421604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.088081636,0.00017767794,0.90801424,0.0006581645,0.0020970514,0.0005413482,0.000072726005,0.00013215728,0.00022501216],"genre_scores_gemma":[0.5819176,0.00013214172,0.41703668,0.0000700331,0.00011819486,0.00004501999,0.0006630599,0.000016270302,0.0000010322146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982218,0.00003133047,0.0011008601,0.00020101712,0.00023716915,0.00020780158],"domain_scores_gemma":[0.99816453,0.000059186066,0.00064711645,0.0005733626,0.00050409633,0.000051685092],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005132145,0.00024636148,0.00046904996,0.0017681508,0.000059476675,0.00010757208,0.0005523044,0.0007738356,0.000010406468],"category_scores_gemma":[0.0003069523,0.0002548175,0.00008331918,0.00044294493,0.00011444965,0.0006797121,0.00012888636,0.0009555992,0.0000036783756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007836321,0.00004329729,0.0005867268,0.00061252015,0.000103690625,0.000002759658,0.00032130664,0.7063323,0.000819785,0.0035878741,0.0005255431,0.28698584],"study_design_scores_gemma":[0.0017268395,0.0004816412,0.00053724536,0.002058485,0.00016550931,0.0014818433,0.006711305,0.8724208,0.09912507,0.011901996,0.0024053683,0.0009838872],"about_ca_topic_score_codex":0.0000051230854,"about_ca_topic_score_gemma":0.000008667248,"teacher_disagreement_score":0.49383593,"about_ca_system_score_codex":0.0003011166,"about_ca_system_score_gemma":0.00015644946,"threshold_uncertainty_score":0.9999904},"labels":[],"label_agreement":null},{"id":"W3186607705","doi":"10.36680/j.itcon.2021.021","title":"Maturity-based mapping of technology and method innovation in off-site construction: conceptual frameworks","year":2021,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Benchmarking; Maturity (psychological); Scope (computer science); Context (archaeology); Capability Maturity Model; Conceptual framework; Process management; Technology roadmap; Knowledge management; Computer science; Systems engineering; Engineering; Business; Marketing; Geography","score_opus":0.00559397306745559,"score_gpt":0.22390091633950168,"score_spread":0.21830694327204608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186607705","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6597995,0.00041739564,0.3373032,0.001198207,0.0007721842,0.00010129104,0.000008084755,0.000086543485,0.00031359185],"genre_scores_gemma":[0.76196885,0.0001703317,0.23776478,0.00004719509,0.000025318912,0.000006122859,0.000010165224,0.0000061732662,0.0000010925803],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99804914,0.00004004228,0.001504318,0.00008993786,0.00016708474,0.000149463],"domain_scores_gemma":[0.99834067,0.00005858859,0.0006785566,0.0001433521,0.0007590826,0.000019739262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040454653,0.00014161917,0.00035651322,0.005481416,0.00003859523,0.000027340244,0.000094067116,0.0009135108,0.00003532142],"category_scores_gemma":[0.0003393091,0.0001556387,0.000039208564,0.004280914,0.00043367338,0.00092134596,0.000023006103,0.0012127325,0.000001662003],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035329344,0.000015966245,0.04485434,0.000092535236,0.000037589663,0.000007347956,0.00040191264,0.0037989526,0.009454235,0.28048182,0.000030880365,0.6607891],"study_design_scores_gemma":[0.008404269,0.0003357233,0.014587021,0.0021479677,0.00008003573,0.013696595,0.06684637,0.0686749,0.5834196,0.22807477,0.0128033655,0.00092936814],"about_ca_topic_score_codex":0.0000018950345,"about_ca_topic_score_gemma":0.0000070367214,"teacher_disagreement_score":0.6598597,"about_ca_system_score_codex":0.0001530002,"about_ca_system_score_gemma":0.00016225314,"threshold_uncertainty_score":0.70458317},"labels":[],"label_agreement":null},{"id":"W4220695606","doi":"10.36680/j.itcon.2022.013","title":"Evaluating the use of virtual reality for maintainability-focused design reviews","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Maintainability; Usability; Virtual reality; Engineering; Human–computer interaction; Computer science; Systems engineering; Reliability engineering; Software engineering","score_opus":0.07157249765784443,"score_gpt":0.3037117611674438,"score_spread":0.23213926350959938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220695606","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12847617,0.0001052019,0.869018,0.00082125317,0.0008779092,0.0006183421,0.000012307128,0.000047574074,0.000023186369],"genre_scores_gemma":[0.8767035,0.00013986681,0.12289739,0.000059806018,0.000040265633,0.00013961854,0.0000070831798,0.000007764733,0.0000047064473],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984226,0.00014383516,0.0011191618,0.0000408542,0.00017712831,0.00009642727],"domain_scores_gemma":[0.9986761,0.00017726158,0.00069620536,0.0001498452,0.00028809314,0.000012476906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019026089,0.000078215795,0.00020228296,0.0005822009,0.00012425738,0.000019530244,0.00015234684,0.00008815829,0.000028890627],"category_scores_gemma":[0.0008141223,0.00006256391,0.00007823088,0.00056057994,0.00013051991,0.0007750756,0.000021722837,0.0003997557,5.9024904e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012391464,0.000008840501,0.00042167542,0.000033869055,0.000021056234,1.1475581e-7,0.00030644194,0.18425815,0.0010157145,0.032704886,0.0005955009,0.7805098],"study_design_scores_gemma":[0.004317306,0.0033672906,0.0010773673,0.0002112442,0.00016143944,0.0021624444,0.017049605,0.70860445,0.03148914,0.15622939,0.07483815,0.00049217686],"about_ca_topic_score_codex":0.000003532372,"about_ca_topic_score_gemma":0.0000016874192,"teacher_disagreement_score":0.7800177,"about_ca_system_score_codex":0.00028036832,"about_ca_system_score_gemma":0.00008950013,"threshold_uncertainty_score":0.2551282},"labels":[],"label_agreement":null},{"id":"W4224210734","doi":"10.36680/j.itcon.2022.022","title":"Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Istanbul Teknik Üniversitesi; Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Facility management; Building information modeling; Software deployment; Occupancy; Process (computing); Post-occupancy evaluation; Systems engineering; Resource (disambiguation); System deployment; Engineering; Computer science; Architectural engineering; Process management; Software engineering; Operations management","score_opus":0.005306839171041152,"score_gpt":0.2184612841904609,"score_spread":0.21315444501941974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224210734","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6565511,0.00030111868,0.33570498,0.0006702144,0.005219773,0.00068064674,0.000052632287,0.00035237783,0.00046713848],"genre_scores_gemma":[0.98367816,0.000024524765,0.016060082,0.000025691903,0.000051729323,0.00010105363,0.00004573241,0.000010214902,0.0000028061045],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984739,0.000049529226,0.0009394244,0.00006796352,0.00031321176,0.00015596625],"domain_scores_gemma":[0.998295,0.000043059863,0.000581271,0.00011862753,0.0009342772,0.000027779728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088190765,0.00013123339,0.00021982433,0.0020189339,0.00016702065,0.0000470361,0.00018044618,0.00019535329,0.00006199113],"category_scores_gemma":[0.0001863493,0.00013357974,0.000077530654,0.0010560661,0.00006397578,0.0011513352,0.00001985536,0.0005996504,0.000004613443],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036345262,0.000023259405,0.0017149117,0.00013640252,0.00010625519,0.0000016713287,0.0004146649,0.07178172,0.006240464,0.09958822,0.0011451166,0.8184839],"study_design_scores_gemma":[0.013099193,0.0017170177,0.0019214178,0.0006931111,0.00039353038,0.013857687,0.18310227,0.5878465,0.10296373,0.022713806,0.07039221,0.0012995214],"about_ca_topic_score_codex":0.0000057072953,"about_ca_topic_score_gemma":0.000004032797,"teacher_disagreement_score":0.8171843,"about_ca_system_score_codex":0.0009844338,"about_ca_system_score_gemma":0.00019283647,"threshold_uncertainty_score":0.5447224},"labels":[],"label_agreement":null},{"id":"W4225088704","doi":"10.36680/j.itcon.2022.007","title":"A simulation-based statistical method for planning modular construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workstation; Modular design; Process (computing); Engineering; Production line; Crew; Wafer fabrication; Production (economics); Reliability engineering; Industrial engineering; Computer science; Mechanical engineering; Operating system","score_opus":0.007430963568854501,"score_gpt":0.2555881924478268,"score_spread":0.24815722887897232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225088704","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.064563125,0.00003976923,0.93340105,0.00019349925,0.0013291856,0.00020403472,0.000036427406,0.00013219666,0.00010074035],"genre_scores_gemma":[0.7038039,0.0000022772535,0.29606703,0.000029759245,0.000036352863,0.000030612235,0.000021747866,0.0000075869607,7.6138707e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865156,0.000040535633,0.0008566421,0.00007012637,0.0002242348,0.00015690875],"domain_scores_gemma":[0.99902856,0.00025597116,0.00040732027,0.00009778228,0.00017900726,0.000031384203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042045215,0.0001223905,0.00021395001,0.0013011291,0.00017721538,0.00003630546,0.00012249144,0.0001447815,0.00008151223],"category_scores_gemma":[0.00017962846,0.00013517207,0.00006405786,0.00038058715,0.00007951299,0.0006952195,0.000014458089,0.00052130653,0.0000014372248],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005866385,0.0000053849662,0.00061861996,0.00002526819,0.00002071662,0.000001173187,0.000090017966,0.79233605,0.0001984299,0.011848039,0.00003202894,0.19476561],"study_design_scores_gemma":[0.0011906623,0.00013115654,0.0001825045,0.000026800974,0.000023171631,0.00037657187,0.0035333075,0.9585935,0.009655838,0.021781402,0.0043650684,0.00014002196],"about_ca_topic_score_codex":0.0000019930856,"about_ca_topic_score_gemma":5.92238e-7,"teacher_disagreement_score":0.63924074,"about_ca_system_score_codex":0.0003618847,"about_ca_system_score_gemma":0.000087000444,"threshold_uncertainty_score":0.5512157},"labels":[],"label_agreement":null},{"id":"W4283011387","doi":"10.36680/j.itcon.2022.028","title":"Construction cybersecurity and critical infrastructure protection: new horizons for Construction 4.0","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"York University; New York University Abu Dhabi","keywords":"Critical infrastructure; Computer security; Work (physics); Plan (archaeology); Asset (computer security); Cyber-physical system; Construction industry; Key (lock); Cyber-attack; Industry 4.0; Engineering; Computer science; Risk analysis (engineering); Construction engineering; Business","score_opus":0.004088971274252653,"score_gpt":0.2167603371283999,"score_spread":0.21267136585414725,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283011387","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3902148,0.00016672819,0.60417074,0.00203389,0.002510504,0.00048372682,0.000041541974,0.0001760321,0.00020203274],"genre_scores_gemma":[0.9187202,0.00008426014,0.080970034,0.000032061722,0.00014214672,0.000031406096,0.000008923853,0.000009730807,0.0000012359956],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983801,0.000048552287,0.0009420799,0.000120269666,0.00027338936,0.00023558343],"domain_scores_gemma":[0.9990589,0.000070424336,0.00036593713,0.00015051966,0.00027671133,0.0000775133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041074885,0.00017900024,0.00033902074,0.0016517262,0.00033453267,0.00006294144,0.00016218338,0.00026874946,0.000109652574],"category_scores_gemma":[0.00040930987,0.00019107752,0.00008771811,0.0010474711,0.00045449645,0.0014613614,0.000046786055,0.00097419135,9.421461e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019007907,0.000016220945,0.0055394527,0.00016189618,0.00010539394,0.0000033331976,0.0006301702,0.059791338,0.0027046849,0.07963806,0.0005833395,0.85063607],"study_design_scores_gemma":[0.00619838,0.002033712,0.0052232607,0.00015208364,0.00037738073,0.031773485,0.048772786,0.059372496,0.04329316,0.7614132,0.040165193,0.0012248663],"about_ca_topic_score_codex":0.000009408148,"about_ca_topic_score_gemma":0.0000053075187,"teacher_disagreement_score":0.8494112,"about_ca_system_score_codex":0.00040187544,"about_ca_system_score_gemma":0.00018001898,"threshold_uncertainty_score":0.7791915},"labels":[],"label_agreement":null},{"id":"W4284693610","doi":"10.36680/j.itcon.2022.029","title":"Conceptual estimation of construction duration and cost of public highway projects","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Duration (music); Cost estimate; Estimation; Procurement; Mean absolute percentage error; Scope (computer science); Transport engineering; Payment; Process (computing); Baseline (sea); Project management; Engineering; Operations research; Computer science; Systems engineering; Artificial intelligence; Business","score_opus":0.007042502944301119,"score_gpt":0.20464914226107533,"score_spread":0.19760663931677422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284693610","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92254984,0.000070054455,0.07575596,0.00012875695,0.0010476678,0.00018690324,0.000010260783,0.0000439779,0.00020655563],"genre_scores_gemma":[0.9801579,0.000063753425,0.019731991,0.0000039898564,0.000020862704,0.000008989221,0.0000078122075,0.0000042262436,4.7351986e-7],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986855,0.000026722659,0.0009489226,0.000039814375,0.00019456321,0.00010450443],"domain_scores_gemma":[0.9988153,0.000026122963,0.00081945414,0.000075543765,0.00024595004,0.0000176028],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038212186,0.000080658865,0.00020298765,0.0012885646,0.000057360397,0.000010906392,0.0000853707,0.00010587609,0.000014136053],"category_scores_gemma":[0.00017128423,0.00008339407,0.000027525539,0.0005634714,0.000261025,0.0010926502,0.00002893493,0.00032772444,2.2594642e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008789451,0.000021608981,0.030749584,0.00016902856,0.00008392861,0.000002413551,0.0025767384,0.1054322,0.017774744,0.13592938,0.00012425103,0.70704824],"study_design_scores_gemma":[0.00823516,0.0015515094,0.01900288,0.00044234528,0.000121978745,0.008920942,0.1262054,0.12502642,0.6736753,0.03174083,0.004333841,0.0007434163],"about_ca_topic_score_codex":0.0000033386757,"about_ca_topic_score_gemma":0.0000010520002,"teacher_disagreement_score":0.70630485,"about_ca_system_score_codex":0.00017812147,"about_ca_system_score_gemma":0.00007920971,"threshold_uncertainty_score":0.34007117},"labels":[],"label_agreement":null},{"id":"W4284899645","doi":"10.36680/j.itcon.2022.031","title":"An earned-value-analysis (EVA)-based project control framework in large-scale scaffolding projects using linear regression modeling","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Earned value management; Schedule; Productivity; Computer science; Project management; Scale (ratio); Scaffold; Engineering; Industrial engineering; Systems engineering; Operations research; Project planning; OPM3","score_opus":0.010298853933732635,"score_gpt":0.2622751645378014,"score_spread":0.2519763106040688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284899645","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5436639,0.000052334555,0.45555303,0.00008629052,0.00036589813,0.00015764666,0.00000796631,0.00008625576,0.000026668271],"genre_scores_gemma":[0.92998534,0.000018329389,0.0698673,0.000041692758,0.00004188777,0.000021356915,0.00001301407,0.000010787382,2.936758e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99805266,0.000116204996,0.001131466,0.00010977232,0.00035445605,0.00023542088],"domain_scores_gemma":[0.99900043,0.000032928554,0.000528647,0.00019829985,0.0002077021,0.000031970823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008938323,0.00016334634,0.00037580245,0.005367152,0.0001842656,0.000048085087,0.0002086871,0.0002943433,0.000034094926],"category_scores_gemma":[0.00009951542,0.00016227426,0.00012239117,0.002815953,0.000052734686,0.0013963927,0.000021169244,0.0010548362,8.39601e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008614712,0.000028408711,0.02382735,0.000020183414,0.000060717088,0.0000029422372,0.0005590872,0.96070355,0.0009242632,0.0018125719,0.0000031110453,0.011971643],"study_design_scores_gemma":[0.0010960179,0.000099234094,0.00016377057,0.00009906242,0.0000919846,0.00019998192,0.0094744945,0.9849226,0.0018920879,0.0017637978,0.00004632873,0.00015068118],"about_ca_topic_score_codex":0.000024433495,"about_ca_topic_score_gemma":0.000016577314,"teacher_disagreement_score":0.38632143,"about_ca_system_score_codex":0.0005799502,"about_ca_system_score_gemma":0.00019540355,"threshold_uncertainty_score":0.6617352},"labels":[],"label_agreement":null},{"id":"W4287921475","doi":"10.36680/j.itcon.2022.032","title":"An integrated RFID–UWB method for indoor localization of materials in construction","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Indoor and Outdoor Localization Technologies","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Trilateration; Radio-frequency identification; Global Positioning System; Computer science; Leverage (statistics); Identification (biology); Ultra-wideband; Radio frequency; Wideband; Tracking (education); Ranging; Real-time computing; Electronic engineering; Engineering; Telecommunications; Artificial intelligence","score_opus":0.005014984277418305,"score_gpt":0.23810668908080762,"score_spread":0.2330917048033893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4287921475","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2753012,0.0000348386,0.72305816,0.000120608376,0.00093415676,0.000302134,0.00005018046,0.00016089335,0.0000378606],"genre_scores_gemma":[0.90890867,0.000067038054,0.090861864,0.000024407975,0.00001819345,0.000042511612,0.000064170825,0.000012449111,6.957152e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9980229,0.00007643107,0.0014433602,0.00007992494,0.00020103237,0.0001763135],"domain_scores_gemma":[0.9986804,0.00004699536,0.0007426839,0.00016043296,0.0003496182,0.000019863177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008423723,0.00014310883,0.00037631983,0.0032437402,0.00007807272,0.00002576704,0.00025732777,0.0003042297,0.00005879306],"category_scores_gemma":[0.00026347107,0.00015087822,0.00004734205,0.0015501056,0.0001434103,0.0011081455,0.00003218915,0.000401208,8.1257343e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038869394,0.000077771336,0.01329409,0.00024074854,0.00007138498,0.0000038026767,0.0010912394,0.5453357,0.024100563,0.05341913,0.00020351734,0.3617733],"study_design_scores_gemma":[0.0032465134,0.0006153962,0.00043585003,0.00011418129,0.000033415698,0.00091879495,0.027055416,0.14154635,0.7959956,0.026964722,0.0027643952,0.00030934653],"about_ca_topic_score_codex":0.000017302074,"about_ca_topic_score_gemma":0.000009561326,"teacher_disagreement_score":0.77189505,"about_ca_system_score_codex":0.00038436867,"about_ca_system_score_gemma":0.00009790847,"threshold_uncertainty_score":0.6152635},"labels":[],"label_agreement":null},{"id":"W4309541269","doi":"10.36680/j.itcon.2022.050","title":"Hybrid feature selection framework for predicting bridge deck conditions","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Artificial neural network; Feature selection; Engineering; Serviceability (structure); Random forest; Hyperparameter; Computer science; Selection (genetic algorithm); Bridge deck; Deck; Machine learning; Artificial intelligence; Structural engineering","score_opus":0.003672905132079263,"score_gpt":0.2211650730778662,"score_spread":0.21749216794578694,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309541269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7000526,0.000044466033,0.2964703,0.00039508028,0.0026042273,0.0001775727,0.000030079766,0.00015046667,0.00007517763],"genre_scores_gemma":[0.95669985,0.000022909204,0.0430254,0.000034353663,0.0001630001,0.000031672782,0.0000133775475,0.000008209534,0.0000012050563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991962,0.000010328785,0.00045075678,0.000042551903,0.00013615022,0.00016402933],"domain_scores_gemma":[0.99939066,0.000043466098,0.00030835884,0.00006557437,0.00017163635,0.00002029964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021759268,0.00008782397,0.00014568926,0.000990757,0.00019925548,0.000024324196,0.00012104846,0.00011588272,0.000018547431],"category_scores_gemma":[0.00017818801,0.0000959923,0.00005546032,0.0004334038,0.000039808267,0.0007167927,0.000020659898,0.00082232826,8.73211e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031703972,0.00004954381,0.16804369,0.0003184723,0.00036245974,0.000018663672,0.0020524156,0.38738045,0.011732381,0.1807614,0.01740073,0.23156276],"study_design_scores_gemma":[0.0058478424,0.0013919905,0.07920707,0.00060572324,0.00018110736,0.025878489,0.018037632,0.079494566,0.12519829,0.6025139,0.06053298,0.0011103901],"about_ca_topic_score_codex":9.2990666e-7,"about_ca_topic_score_gemma":5.864379e-7,"teacher_disagreement_score":0.4217525,"about_ca_system_score_codex":0.00037090914,"about_ca_system_score_gemma":0.000050107858,"threshold_uncertainty_score":0.39144525},"labels":[],"label_agreement":null},{"id":"W4317829607","doi":"10.36680/j.itcon.2023.002","title":"How typical is your project? The need for a no-model approach for information management in AEC","year":2023,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Semantic Web and Ontologies","field":"Computer Science","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Knowledge management; Computer science; Stakeholder; Scope (computer science); Data science; Process management; Engineering","score_opus":0.025726719752511007,"score_gpt":0.26976472874164914,"score_spread":0.24403800898913813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317829607","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012945023,0.00000845915,0.97573537,0.009788731,0.00036364523,0.0007663878,0.0000035362045,0.00008888861,0.00029998267],"genre_scores_gemma":[0.28387913,0.00008502298,0.7153601,0.0004080127,0.000035078305,0.00018838649,0.000011705458,0.0000034600077,0.000029079656],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899924,0.000011773951,0.0005728982,0.00006024426,0.0001695528,0.00018629852],"domain_scores_gemma":[0.9989897,0.00005146212,0.00048713843,0.00017300046,0.00028742824,0.0000112727475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066685607,0.00008496986,0.00015541542,0.00174039,0.00007778979,0.00015711485,0.0004950102,0.00016539163,1.7881024e-7],"category_scores_gemma":[0.00027897928,0.00006118979,0.000060919327,0.0010657406,0.00007316411,0.0029883913,0.00008389613,0.00019074534,0.0000033026774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019395474,0.000026385618,0.0010266886,0.00017276967,0.000044776752,7.80191e-7,0.002583826,0.003145431,0.0000284312,0.35125127,0.0049010185,0.6366247],"study_design_scores_gemma":[0.0019399197,0.00014853686,0.0008768795,0.000032903863,0.000010573691,0.00013638352,0.012303016,0.9265942,0.00060545217,0.051952995,0.0052896063,0.00010956108],"about_ca_topic_score_codex":0.000001611505,"about_ca_topic_score_gemma":0.0000010175448,"teacher_disagreement_score":0.92344874,"about_ca_system_score_codex":0.000088510016,"about_ca_system_score_gemma":0.00008472159,"threshold_uncertainty_score":0.24952474},"labels":[],"label_agreement":null},{"id":"W4386967114","doi":"10.36680/j.itcon.2023.030","title":"Utilizing augmented reality for the assembly and disassembly of panelized construction","year":2023,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Augmented Reality Applications","field":"Computer Science","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"University of Seoul; Chung-Ang University","keywords":"Prefabrication; Workflow; Workforce; Engineering; Construction management; Construction engineering; Resource (disambiguation); Supply chain; Architectural engineering; Systems engineering; Computer science; Civil engineering; Business; Database","score_opus":0.022147835537092198,"score_gpt":0.2892901876763418,"score_spread":0.2671423521392496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386967114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11024929,0.00003282527,0.8801017,0.008750789,0.00034629751,0.0003331254,0.000006803559,0.00009388924,0.00008527998],"genre_scores_gemma":[0.9604717,0.0003214902,0.039119896,0.000033213415,0.00001729043,0.000026244834,0.0000054157254,0.0000029597077,0.0000017799638],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986622,0.000037019272,0.000882374,0.00008117204,0.0001982484,0.00013900649],"domain_scores_gemma":[0.9979576,0.00027689667,0.0011181217,0.00025037464,0.00037197533,0.000025057685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009808614,0.000082796374,0.00019507846,0.00089873775,0.00013957299,0.000045931247,0.000366863,0.00014843159,8.3532893e-7],"category_scores_gemma":[0.00037846956,0.00006524142,0.00005341351,0.0014060258,0.00029268322,0.0011748146,0.00009630739,0.00019521228,0.0000015565812],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046184246,0.000018632318,0.0019726811,0.000055852925,0.00006397867,5.074458e-7,0.0005247643,0.00064527104,0.0055727223,0.5104307,0.00029100335,0.48037773],"study_design_scores_gemma":[0.007807411,0.00065588346,0.03809893,0.00045092127,0.00017221304,0.0034983328,0.0428325,0.35640195,0.1542144,0.3888449,0.006464555,0.0005580185],"about_ca_topic_score_codex":0.000011849773,"about_ca_topic_score_gemma":0.000004983014,"teacher_disagreement_score":0.8502224,"about_ca_system_score_codex":0.00007719135,"about_ca_system_score_gemma":0.00010024862,"threshold_uncertainty_score":0.26604676},"labels":[],"label_agreement":null},{"id":"W4391564779","doi":"10.36680/j.itcon.2024.002","title":"Construction 4.0: A comparative analysis of research and practice","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Engineering; Engineering ethics","score_opus":0.021983456786992893,"score_gpt":0.32980386802271755,"score_spread":0.3078204112357247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391564779","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87558365,0.0019080922,0.11039374,0.0013071666,0.0018348389,0.00021471301,0.000018965819,0.0002113895,0.008527437],"genre_scores_gemma":[0.9815495,0.00054700905,0.017862309,0.000004357914,0.000024662197,0.0000035971048,0.0000039888187,0.0000025527756,0.0000019965187],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987968,0.000049019465,0.0007669397,0.000055248755,0.00023180383,0.000100140074],"domain_scores_gemma":[0.9987039,0.00025349323,0.00020448458,0.00008254704,0.00073148496,0.000024086223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077959447,0.00007745939,0.00024742814,0.006349811,0.00003821181,0.000060541213,0.000071318296,0.00019730696,0.00002272837],"category_scores_gemma":[0.00020410746,0.0000722172,0.00004780426,0.0038472998,0.00050464045,0.0018863087,0.0000126904815,0.0005618045,0.0000036924955],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012319001,0.000018913013,0.0049357526,0.0001527454,0.0011923704,0.000006092054,0.0025147833,0.0051695458,0.0032554702,0.5937937,0.0002851486,0.3885523],"study_design_scores_gemma":[0.0029425437,0.001519477,0.011865299,0.0017435044,0.0021099409,0.022513406,0.25502315,0.3450642,0.116467915,0.19769523,0.04215471,0.0009006569],"about_ca_topic_score_codex":0.0000061296814,"about_ca_topic_score_gemma":0.000007211145,"teacher_disagreement_score":0.39609846,"about_ca_system_score_codex":0.00013616764,"about_ca_system_score_gemma":0.00006843942,"threshold_uncertainty_score":0.566587},"labels":[],"label_agreement":null},{"id":"W4394927140","doi":"10.36680/j.itcon.2024.014","title":"Development of standard-based information requirements for the facility management of a canteen","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"MIT Portugal; Fundação para a Ciência e a Tecnologia; Ministério da Ciência, Tecnologia e Ensino Superior","keywords":"Systems engineering; Facility management; Engineering; Engineering management; Computer science; Software engineering; Business","score_opus":0.009104826860086975,"score_gpt":0.2316689763949585,"score_spread":0.22256414953487152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394927140","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13429184,0.00014345696,0.86372644,0.00023198925,0.0009408061,0.0002938273,0.000045168945,0.00005685094,0.00026963127],"genre_scores_gemma":[0.94630754,0.000059056743,0.053587604,0.000005269051,0.0000063792854,0.000019289186,0.000011925457,0.0000020299553,8.9360117e-7],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986294,0.00000554266,0.0010694197,0.000025569907,0.0001949206,0.000075172255],"domain_scores_gemma":[0.9992746,0.000023536728,0.0003107138,0.000082530605,0.00029833918,0.000010268483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043383625,0.000072582014,0.00013484659,0.00080998626,0.000034725603,0.000021359883,0.00010657586,0.00010201787,0.000016618325],"category_scores_gemma":[0.000024808822,0.000055707605,0.000049940445,0.00044283448,0.00008896019,0.0010268551,0.000009024136,0.00014521614,0.0000017044072],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000704852,0.0000037643667,0.00033576158,0.00056783267,0.000117239695,1.4647293e-7,0.00053432793,0.0041021244,0.00036428505,0.019522026,0.00010324831,0.97427875],"study_design_scores_gemma":[0.005940504,0.0004963073,0.003994112,0.0030194025,0.0002971767,0.00030112357,0.050303992,0.18050854,0.5904326,0.016317729,0.14782721,0.00056133495],"about_ca_topic_score_codex":0.0000012072786,"about_ca_topic_score_gemma":0.000003356479,"teacher_disagreement_score":0.97371745,"about_ca_system_score_codex":0.000196008,"about_ca_system_score_gemma":0.0001236398,"threshold_uncertainty_score":0.22716902},"labels":[],"label_agreement":null},{"id":"W4399204586","doi":"10.36680/j.itcon.2024.018","title":"A cloud-based integration of Building Information Modeling and Virtual Reality through game engine to facilitate the design of Age-in-Place homes at the conceptual stage","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Game engine; Building information modeling; Virtual reality; Conceptual model; Cloud computing; Conceptual design; Engineering; Architectural engineering; Stage (stratigraphy); Computer science; Human–computer interaction; Systems engineering; Operations management; Database; Operating system; Geology","score_opus":0.021914974288020417,"score_gpt":0.24152913631094464,"score_spread":0.21961416202292422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399204586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42059872,0.000122045996,0.5782668,0.00042026577,0.00033479786,0.00017684368,0.0000148392155,0.000034042492,0.00003168354],"genre_scores_gemma":[0.9935231,0.00016705148,0.0062472317,0.000021562226,0.000015741798,0.000012084623,0.0000060710267,0.000004018124,0.0000031048203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984976,0.000057782443,0.0010817599,0.000050085524,0.00020437477,0.000108397486],"domain_scores_gemma":[0.9992106,0.00015624092,0.00027745654,0.00012067272,0.00021893591,0.000016126964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007765777,0.00011916931,0.00020793696,0.0007988749,0.000041429303,0.00004294429,0.0001228465,0.00016577035,0.000009687018],"category_scores_gemma":[0.00022001074,0.00008145824,0.000044452496,0.0007467777,0.00025201243,0.0016340688,0.000020952617,0.00040620303,0.0000013720672],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011442304,0.000003162991,0.00009387731,0.00006702932,0.000024235063,4.9113993e-7,0.005230038,0.8650106,0.0043889377,0.033090714,0.00005507048,0.09192142],"study_design_scores_gemma":[0.0006744695,0.00022840904,0.00009319863,0.00037738535,0.000021136584,0.0001439942,0.020514447,0.9228922,0.04972514,0.0042008557,0.0010082078,0.00012053432],"about_ca_topic_score_codex":0.00003052229,"about_ca_topic_score_gemma":0.000038039627,"teacher_disagreement_score":0.57292444,"about_ca_system_score_codex":0.00021857118,"about_ca_system_score_gemma":0.00007967056,"threshold_uncertainty_score":0.33217704},"labels":[],"label_agreement":null},{"id":"W4402703473","doi":"10.36680/j.itcon.2024.053","title":"From NLP to Taxonomy: Identifying and Classifying Key Functionality Concepts of Multi-level Project Planning and Control Systems","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Business Process Modeling and Analysis","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Taxonomy (biology); Computer science; Key (lock); Artificial intelligence; Natural language processing; Information retrieval; Biology","score_opus":0.058454173091675,"score_gpt":0.2924758451990114,"score_spread":0.23402167210733638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402703473","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5384434,0.000946348,0.45924374,0.0005812894,0.00054554373,0.0001434387,0.00000859242,0.00004774364,0.000039922328],"genre_scores_gemma":[0.99459076,0.000025253024,0.005144993,0.000058331745,0.00015839866,0.000009929606,0.0000056652852,0.000004345053,0.000002330204],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989399,0.000008277551,0.00071547274,0.000093578536,0.00014779395,0.00009502924],"domain_scores_gemma":[0.9989156,0.000044173998,0.0005913467,0.000058061858,0.00038286924,0.000007934444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047399921,0.000098637815,0.00026433857,0.0018095411,0.00007470476,0.00026479628,0.000075277974,0.0001333518,0.000003420137],"category_scores_gemma":[0.00020621599,0.00008745108,0.000032598193,0.00069413905,0.000094915464,0.0026741878,0.000042641168,0.00023167813,0.000002219238],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031655453,0.000053868327,0.31519255,0.0028915384,0.00060133607,0.000020433292,0.001618165,0.019298801,0.0043337066,0.02149585,0.00036093587,0.63381624],"study_design_scores_gemma":[0.00444153,0.000059326947,0.02554878,0.0053072497,0.00054083334,0.00038710228,0.049741328,0.8952429,0.0007404016,0.009112792,0.008283152,0.0005945601],"about_ca_topic_score_codex":0.00022727759,"about_ca_topic_score_gemma":0.000006018324,"teacher_disagreement_score":0.87594414,"about_ca_system_score_codex":0.000042838856,"about_ca_system_score_gemma":0.00005465136,"threshold_uncertainty_score":0.35661516},"labels":[],"label_agreement":null},{"id":"W4409046432","doi":"10.36680/j.itcon.2025.019","title":"A review of machine learning for analysing accident reports in the construction industry","year":2025,"lang":"en","type":"review","venue":"Journal of Information Technology in Construction","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Innovation Cluster (Canada)","funders":"","keywords":"Context (archaeology); Computer science; CLARITY; Artificial intelligence; Machine learning; Structuring; Unstructured data; Unsupervised learning; Data science; Accident (philosophy); Natural language processing; Data mining; Big data","score_opus":0.06125469995933066,"score_gpt":0.49647807543031924,"score_spread":0.4352233754709886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409046432","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000093822055,0.99224836,0.001884297,0.0016244049,0.0009545564,0.0026787303,0.000016539876,0.000015815742,0.00048345822],"genre_scores_gemma":[0.00016157315,0.9964037,0.002869734,0.00017267765,0.000077733705,0.00019409583,0.00010618349,0.0000062005574,0.000008109318],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9933247,0.00081176386,0.0050682,0.000115363044,0.00038918518,0.0002908083],"domain_scores_gemma":[0.99009484,0.0016368667,0.006887691,0.0002623963,0.0010806076,0.00003759703],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.006483407,0.00019207752,0.001435875,0.0038936008,0.0002421331,0.00000905974,0.00030038963,0.0012474381,0.00004525099],"category_scores_gemma":[0.008287677,0.00013503442,0.00027410866,0.002791459,0.00014535067,0.0005160191,0.00006740316,0.0048041493,0.0000024831909],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032556738,0.000012590846,0.012391687,0.08505653,0.00003622739,0.0000032759226,0.000065323016,0.000010132183,3.889588e-8,0.0012816981,0.00020954435,0.9009004],"study_design_scores_gemma":[0.00078036485,0.00018272283,0.00049647916,0.3528751,0.0003258433,0.0015889952,0.0026101833,0.00007282374,0.0000014556572,0.0028511693,0.63804585,0.00016901328],"about_ca_topic_score_codex":0.00003392067,"about_ca_topic_score_gemma":0.000022480524,"teacher_disagreement_score":0.9007314,"about_ca_system_score_codex":0.0006053777,"about_ca_system_score_gemma":0.0032159945,"threshold_uncertainty_score":0.99749184},"labels":[],"label_agreement":null},{"id":"W4411805355","doi":"10.36680/j.itcon.2025.044","title":"Process time estimation for workstations in modular construction production line","year":2025,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workstation; Modular design; Production (economics); Process (computing); Production line; Estimation; Computer science; Line (geometry); Engineering; Manufacturing engineering; Industrial engineering; Systems engineering; Engineering drawing; Mechanical engineering; Operating system; Mathematics","score_opus":0.002803335195913912,"score_gpt":0.21997801603922276,"score_spread":0.21717468084330885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411805355","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33127296,0.000060260092,0.6662948,0.0009329873,0.00078055734,0.00036235826,0.0000032115122,0.000119572556,0.000173279],"genre_scores_gemma":[0.91786087,0.00010235454,0.08191733,0.00001172697,0.000028528024,0.000038986243,0.000024561303,0.000006553483,0.000009105073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988338,0.000010271077,0.0008527156,0.00007006856,0.000105095205,0.00012806087],"domain_scores_gemma":[0.99918723,0.000026946951,0.0003272892,0.00008930778,0.00035453163,0.000014719834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029466557,0.00010897363,0.0001954314,0.0024818492,0.00005455761,0.0000346345,0.0000968951,0.00022817994,0.000006269073],"category_scores_gemma":[0.0003593268,0.000116447816,0.000032537693,0.0011086987,0.00007034664,0.001615826,0.00000688967,0.00027490102,0.0000022738018],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040080817,0.0000126054365,0.0011290142,0.00016388668,0.000014130747,1.9377875e-7,0.0001426842,0.82908845,0.00017307488,0.0023472002,0.000031168966,0.16685753],"study_design_scores_gemma":[0.0014905161,0.000073692616,0.0018099877,0.0005270481,0.000030514399,0.00013703134,0.0011821544,0.86928,0.054648835,0.07038996,0.00024689283,0.00018338198],"about_ca_topic_score_codex":0.0000011494237,"about_ca_topic_score_gemma":0.0000035335395,"teacher_disagreement_score":0.5865879,"about_ca_system_score_codex":0.00021531386,"about_ca_system_score_gemma":0.000080675534,"threshold_uncertainty_score":0.4748604},"labels":[],"label_agreement":null},{"id":"W4413982218","doi":"10.36680/j.itcon.2025.056","title":"A Deployable Solution for Indoor Tracking of Workers in Construction Sites through Bluetooth Low Energy Technology","year":2025,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"Indoor and Outdoor Localization Technologies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Bluetooth Low Energy; Bluetooth; Architectural engineering; Tracking (education); Engineering; Low energy; Energy (signal processing); Systems engineering; Automotive engineering; Embedded system; Computer science; Civil engineering; Telecommunications; Wireless; Physics","score_opus":0.005253542803384822,"score_gpt":0.22008201983365963,"score_spread":0.2148284770302748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413982218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33247384,0.000328896,0.66485834,0.0006890859,0.0007604677,0.0002410625,0.0000071189274,0.00032336215,0.00031780527],"genre_scores_gemma":[0.94954085,0.0003670004,0.049997278,0.000026375892,0.000016189431,0.000030103294,0.000008504031,0.0000107310625,0.0000029801881],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9980468,0.000017786313,0.0014128288,0.00010267875,0.0001427163,0.0002771606],"domain_scores_gemma":[0.99867785,0.00007307754,0.0006280341,0.00018529163,0.0004221693,0.00001360166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028995043,0.00018324713,0.00043537412,0.004744755,0.000069712296,0.000027837714,0.00026924434,0.000799443,0.000006235124],"category_scores_gemma":[0.00048323136,0.00019383481,0.00008436714,0.002736731,0.0004077638,0.0013723301,0.000039077106,0.00047780777,9.334829e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002265146,0.00006501058,0.16752972,0.00045676116,0.0001522161,0.0000037376797,0.00035296395,0.028859818,0.011194717,0.19565132,0.000489897,0.5950173],"study_design_scores_gemma":[0.004282419,0.00025187107,0.0015881084,0.0010776013,0.000059825587,0.0003959545,0.013667149,0.03669327,0.73096883,0.20877591,0.0018565862,0.00038245486],"about_ca_topic_score_codex":0.000020897636,"about_ca_topic_score_gemma":0.00006191358,"teacher_disagreement_score":0.7197741,"about_ca_system_score_codex":0.00038221388,"about_ca_system_score_gemma":0.00014462018,"threshold_uncertainty_score":0.79043543},"labels":[],"label_agreement":null},{"id":"W7128178412","doi":"10.36680/j.itcon.2025.046","title":"Decentralized and Collaborative Information Management System in Construction Contract Administration: A change management case study","year":2025,"lang":"","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Smart contract; Ontology; Information management; Context (archaeology); Information system; Process (computing); Management information systems; Blockchain; Information security management","score_opus":0.005514737249226615,"score_gpt":0.23691177977933375,"score_spread":0.23139704253010715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128178412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89792955,0.0013587588,0.08206285,0.0012232683,0.0069889207,0.005440838,0.000053770433,0.00024773818,0.0046942863],"genre_scores_gemma":[0.97984236,0.0022410755,0.017609762,0.00004644659,0.0000398814,0.0001931167,0.00001439942,0.0000090367275,0.0000039036927],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9954258,0.00016795368,0.0034241644,0.00019689088,0.00041272497,0.00037244352],"domain_scores_gemma":[0.9971437,0.00005717273,0.0016460111,0.0002884895,0.0007814199,0.0000832441],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009556151,0.00043653222,0.00070882856,0.00720743,0.00022158673,0.00035921476,0.00020580609,0.00060787756,0.000022885655],"category_scores_gemma":[0.000058439524,0.00047734557,0.00008312041,0.0035951335,0.00031841622,0.0064186463,0.000076506396,0.0008860144,0.000008051788],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052444084,0.00011611828,0.029671336,0.0011079223,0.00045781196,0.00051706925,0.0030236342,0.00045005477,0.000005163996,0.16899176,0.000033980723,0.7951007],"study_design_scores_gemma":[0.022969926,0.0010508128,0.020707915,0.00430893,0.00080711173,0.041771825,0.8764393,0.020132858,0.0009003293,0.003934979,0.006077133,0.00089891086],"about_ca_topic_score_codex":0.00005500808,"about_ca_topic_score_gemma":0.00016468715,"teacher_disagreement_score":0.87341565,"about_ca_system_score_codex":0.0013928128,"about_ca_system_score_gemma":0.00019171427,"threshold_uncertainty_score":0.99976784},"labels":[],"label_agreement":null},{"id":"W958625388","doi":"","title":"Editorial: special issue on use of virtual world technology in architecture, engineering and construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Metaverse; Virtual world; Architecture; Virtual reality; Dominance (genetics); Visualization; Computer science; Engineering; World Wide Web; Multimedia; Human–computer interaction; Geography","score_opus":0.003383589176464001,"score_gpt":0.18733492069947855,"score_spread":0.18395133152301454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W958625388","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010732638,0.00008107856,0.0033389905,0.000110338144,0.9848836,0.0002666006,0.00005147206,0.0001678653,0.00036739],"genre_scores_gemma":[0.009255035,0.0012539227,0.021576218,0.000007230609,0.9677513,0.000028888348,0.000050756447,0.000059401984,0.000017213459],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972836,0.000030412028,0.0018163245,0.0001540862,0.00045824717,0.000257353],"domain_scores_gemma":[0.9979317,0.00019713424,0.0010516153,0.00022916457,0.00054300996,0.000047362897],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.00032191558,0.00036463919,0.00072039675,0.010509004,0.000034809666,0.00005322135,0.0002395646,0.0020840238,0.00003812961],"category_scores_gemma":[0.0009344977,0.00037954331,0.00008570115,0.0015888757,0.00042102984,0.001144936,0.00004257883,0.0029182048,0.0000061593173],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043244852,0.000041246247,0.0011341635,0.00027003876,0.00016891975,0.000007890033,0.0003608141,0.009022586,0.00043348045,0.033661,0.37278762,0.58167976],"study_design_scores_gemma":[0.0018242846,0.0004429996,0.00007260589,0.0010747155,0.000054193733,0.00037672598,0.0007453191,0.0006287964,0.0072482876,0.0097544165,0.9773202,0.0004574813],"about_ca_topic_score_codex":0.000015254199,"about_ca_topic_score_gemma":0.000050466748,"teacher_disagreement_score":0.60453254,"about_ca_system_score_codex":0.00038443663,"about_ca_system_score_gemma":0.00017482124,"threshold_uncertainty_score":0.99986565},"labels":[],"label_agreement":null},{"id":"W967810751","doi":"","title":"Truck+ for earthmoving operations","year":2014,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Truck; Global Positioning System; Interface (matter); Graphical user interface; Application programming interface; Geographic information system; Software; Component Object Model; User interface; Engineering; Tracking system; Computer science; Web application; Database; World Wide Web; Operating system; Automotive engineering","score_opus":0.0032874263430774527,"score_gpt":0.1929169950006865,"score_spread":0.18962956865760902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W967810751","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21369278,0.000034955934,0.7831827,0.00049868476,0.0013225653,0.00011672434,0.0000030384872,0.0001112587,0.0010373014],"genre_scores_gemma":[0.9375508,0.000033625507,0.0622816,0.000031565447,0.000080269034,0.000009933534,0.0000039341403,0.0000047266426,0.0000035661494],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991848,0.000009645236,0.0005995947,0.000030958658,0.00007997191,0.00009506086],"domain_scores_gemma":[0.99950033,0.000027908407,0.00012698123,0.00007508103,0.00024922748,0.000020472318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023356939,0.0000717581,0.00013251604,0.0009898375,0.000056121906,0.000038370115,0.000084332154,0.00016634329,0.000016231961],"category_scores_gemma":[0.00017772011,0.000069531,0.00004499898,0.0003267656,0.000063481864,0.0011283633,0.0000046993705,0.00021219188,0.000006838923],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014074699,0.0000045108914,0.002096353,0.000026224412,0.000018964423,1.1405518e-7,0.00014114144,0.024824835,0.0016998199,0.19839332,0.00023184357,0.7725488],"study_design_scores_gemma":[0.005621407,0.0006272883,0.004288563,0.00031482565,0.000070458744,0.0032245822,0.006769409,0.62656873,0.13338305,0.13906178,0.07939798,0.00067191024],"about_ca_topic_score_codex":9.866408e-7,"about_ca_topic_score_gemma":0.000008244273,"teacher_disagreement_score":0.7718769,"about_ca_system_score_codex":0.00007307665,"about_ca_system_score_gemma":0.0000304142,"threshold_uncertainty_score":0.28353918},"labels":[],"label_agreement":null}]}