{"meta":{"query_hash":"c22e875bd917","filters":{"venue":"Journal of Infrastructure Systems"},"cohort_total":56,"direct_labels_cover":0,"predictions_cover":56,"exported":56,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/c22e875bd917","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Infrastructure+Systems"},"results":[{"id":"W1966105912","doi":"10.1061/(asce)1076-0342(2010)16:1(73)","title":"Probability of Failure Analysis due to Internal Corrosion in Cast-Iron Pipes","year":2010,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; University of British Columbia","keywords":"Corrosion; Monte Carlo method; Cast iron; Materials science; Chlorine; Reliability (semiconductor); Metallurgy; Mathematics; Physics; Thermodynamics","score_opus":0.0051956835770606115,"score_gpt":0.20915859295311934,"score_spread":0.20396290937605874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1966105912","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8308894,0.0005707022,0.1658667,0.000044679156,0.000013697864,0.000045282322,0.00019136997,0.0003608086,0.0020173662],"genre_scores_gemma":[0.9974074,0.0000751855,0.0018931506,0.0000027692229,0.000004543117,0.000009298413,0.00011339761,0.000010129164,0.00048413375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930346,0.00017462081,0.000027692044,0.00007973585,0.0003127092,0.00010187261],"domain_scores_gemma":[0.9911397,0.0058821077,0.0015434913,0.00041018816,0.00086501957,0.00015952329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017182358,0.0005357231,0.0004837455,0.0017161955,0.00020396846,0.00040684044,0.0005937002,0.0005544844,0.0009975058],"category_scores_gemma":[0.006919037,0.00039345984,0.0008972936,0.00039098086,0.0006660643,0.00036110505,0.00040896467,0.00047453505,0.00019229863],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003493853,0.000046936908,0.0469685,0.00013670034,0.00008299996,0.0005418041,0.00017585645,0.9189329,0.010233629,0.003494221,0.00033165226,0.018705297],"study_design_scores_gemma":[0.000011123297,0.00022070417,0.02687914,0.0000152435405,0.00005143355,0.0004056658,0.00003658032,0.9638286,0.006843914,0.0013760526,0.00029046924,0.000041010942],"about_ca_topic_score_codex":0.004255975,"about_ca_topic_score_gemma":0.0020040846,"teacher_disagreement_score":0.004255975,"about_ca_system_score_codex":0.00059519854,"about_ca_system_score_gemma":0.00028414547,"threshold_uncertainty_score":0.009087026},"labels":[],"label_agreement":null},{"id":"W1969945197","doi":"10.1061/(asce)1076-0342(2009)15:3(222)","title":"Subway Station Diagnosis Index Condition Assessment Model","year":2009,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Analytic hierarchy process; Ranking (information retrieval); Subway station; Index (typography); Transport engineering; Scale (ratio); Operations research; Engineering; Computer science; Geography; Artificial intelligence","score_opus":0.004695816789847956,"score_gpt":0.24397844677246328,"score_spread":0.23928262998261532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969945197","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32711673,0.00029559803,0.607747,0.0009808117,0.0001014392,0.0014334,0.006793311,0.0012817737,0.05424991],"genre_scores_gemma":[0.95346004,0.00016650486,0.036032256,0.00004171448,0.000020770525,0.00061168196,0.0019503414,0.00001855758,0.0076980493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888605,0.00021468321,0.00007514143,0.00024058012,0.00042209355,0.00016148612],"domain_scores_gemma":[0.997851,0.0007164895,0.00031590834,0.0000915056,0.00092903234,0.000096077754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013020929,0.0008039936,0.00053112756,0.0024527854,0.0005147603,0.0017292547,0.0015869751,0.0008994499,0.010799274],"category_scores_gemma":[0.0047267694,0.00020037385,0.00066019007,0.0020755986,0.00050335116,0.0016385067,0.00095015316,0.0006783728,0.0013829245],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036758638,0.00040173501,0.06273883,0.00024741582,0.00012016826,0.0003475417,0.0005975721,0.7415366,0.0027251935,0.039038356,0.007165482,0.14471348],"study_design_scores_gemma":[0.000018697392,0.00010353443,0.008113532,0.000019021505,0.000032766096,0.00006994869,0.0002061781,0.9811302,0.0005012453,0.007528919,0.002253111,0.000022905728],"about_ca_topic_score_codex":0.020916127,"about_ca_topic_score_gemma":0.011667837,"teacher_disagreement_score":0.020916127,"about_ca_system_score_codex":0.0024403783,"about_ca_system_score_gemma":0.0017324367,"threshold_uncertainty_score":0.041588783},"labels":[],"label_agreement":null},{"id":"W1970743258","doi":"10.1061/(asce)1076-0342(2004)10:3(119)","title":"Life-Cycle Energy Analysis of a Water Distribution System","year":2004,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":164,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"U.S. Department of Commerce","keywords":"Dispose pattern; Energy (signal processing); Service life; Engineering; Environmental science; Energy recovery; Reliability engineering; Process engineering; Waste management; Statistics; Mathematics","score_opus":0.0021289649152352852,"score_gpt":0.1603540088120682,"score_spread":0.15822504389683292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970743258","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6969498,0.0009030736,0.26465654,0.00037966162,0.000028995,0.0005062017,0.0030405258,0.000288135,0.033247117],"genre_scores_gemma":[0.9811593,0.00023152861,0.014162985,0.000027288113,0.000004467042,0.00018059363,0.0007581243,0.000051100942,0.0034245835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995177,0.00019341461,0.000013911861,0.000048570502,0.00014973158,0.00007663946],"domain_scores_gemma":[0.9994634,0.00030343398,0.00004554434,0.000025845933,0.00014692573,0.000014928351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092032284,0.0007457582,0.0004670746,0.0015834309,0.00043728235,0.00075990264,0.00047514972,0.00053788995,0.0032677846],"category_scores_gemma":[0.0017472378,0.00038636127,0.0007509889,0.0011715713,0.0003922706,0.0011032504,0.0004201689,0.00040802796,0.0002373717],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039095175,0.000023636607,0.0013876957,0.00003998224,0.000027143242,0.000042459073,0.000019790075,0.98722863,0.0009834988,0.003221542,0.00015349811,0.0068330714],"study_design_scores_gemma":[0.0000064318338,0.000051926454,0.0014882387,0.0000092366045,0.000013728954,0.00001215344,0.00003098681,0.99392223,0.0012186692,0.002367434,0.0008695407,0.000009364066],"about_ca_topic_score_codex":0.029906815,"about_ca_topic_score_gemma":0.020779196,"teacher_disagreement_score":0.029906815,"about_ca_system_score_codex":0.002651493,"about_ca_system_score_gemma":0.0013453715,"threshold_uncertainty_score":0.059465468},"labels":[],"label_agreement":null},{"id":"W1978909080","doi":"10.1061/(asce)is.1943-555x.0000252","title":"Framework for Modeling On-Site Productivity of Preventive Maintenance Activities for Wastewater Collection Systems","year":2015,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Flushing; Duration (music); Scheduling (production processes); Engineering; Global Positioning System; Environmental science; Operations research; Operations management","score_opus":0.016095706082805146,"score_gpt":0.23146262934204498,"score_spread":0.21536692325923984,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978909080","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040432736,0.00055069313,0.9480827,0.0006456251,0.000085741034,0.0001661783,0.0014150235,0.00063202064,0.007989391],"genre_scores_gemma":[0.8562978,0.0013014561,0.12394654,0.00015381743,0.0001575154,0.0011640966,0.0013474132,0.00022922247,0.0154021615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999003,0.00035809763,0.00004786658,0.00023045721,0.00017756967,0.00018298265],"domain_scores_gemma":[0.99838316,0.0010247697,0.00023481734,0.000046694215,0.00022159835,0.000088901565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002479033,0.0018949863,0.0015080258,0.0015571143,0.0007159109,0.0020153315,0.0031709836,0.0029322878,0.0048895613],"category_scores_gemma":[0.004322976,0.001058011,0.0021710806,0.0014624456,0.00086406514,0.001403318,0.0013395669,0.0018743506,0.0007619442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071743852,0.000024697714,0.00034856496,0.000012836867,0.000015093279,0.000020793515,0.000012084979,0.9944026,0.00010770465,0.0036418957,0.00014624116,0.0012603789],"study_design_scores_gemma":[0.0000033633878,0.000007917931,0.00010510287,0.0000023476111,0.0000047815556,0.0000032769074,0.0000060268676,0.9984546,0.000025031015,0.0011892709,0.00019489053,0.000003327026],"about_ca_topic_score_codex":0.07938817,"about_ca_topic_score_gemma":0.043828107,"teacher_disagreement_score":0.07938817,"about_ca_system_score_codex":0.0028830266,"about_ca_system_score_gemma":0.0040100417,"threshold_uncertainty_score":0.15785217},"labels":[],"label_agreement":null},{"id":"W1987981921","doi":"10.1061/(asce)is.1943-555x.0000241","title":"Winter Road Surface Condition Forecasting","year":2014,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Smart Materials for Construction","field":"Environmental Science","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Autoregressive integrated moving average; Univariate; Computer science; Long-term prediction; Multivariate statistics; Autoregressive model; Snow; Flexibility (engineering); Time series; Operations research; Meteorology; Industrial engineering; Environmental science; Econometrics; Engineering; Statistics; Machine learning; Mathematics","score_opus":0.0067535327013934065,"score_gpt":0.20680714264242697,"score_spread":0.20005360994103358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1987981921","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8313741,0.0012680149,0.14614722,0.00069055334,0.00020187817,0.00006419607,0.005775099,0.0017146671,0.0127642425],"genre_scores_gemma":[0.9918955,0.0002471507,0.0054184445,0.000014738343,0.000029850084,0.000008243622,0.001624358,0.000029636298,0.0007321517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997799,0.000023713514,0.000015263244,0.00007255947,0.0000741527,0.000034472272],"domain_scores_gemma":[0.99955887,0.00006973726,0.00007872142,0.000058780304,0.00020620361,0.000027600632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033811995,0.00041368822,0.00028938122,0.00095003325,0.00016857735,0.0007585771,0.00055702886,0.0005068726,0.001242921],"category_scores_gemma":[0.0011403229,0.00008602435,0.0003624767,0.00078888284,0.000109364155,0.000847529,0.0002959221,0.00040541956,0.00032053317],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016837912,0.000082560284,0.117172785,0.0001449419,0.00011301907,0.00025039143,0.00013330446,0.6752129,0.009417574,0.00418314,0.005945685,0.1871753],"study_design_scores_gemma":[0.000003309326,0.000023130322,0.024832709,0.0000128630645,0.000025375432,0.000027038965,0.000070257185,0.96919525,0.0022183456,0.0009417976,0.0026349626,0.000014923565],"about_ca_topic_score_codex":0.02320616,"about_ca_topic_score_gemma":0.021057965,"teacher_disagreement_score":0.02320616,"about_ca_system_score_codex":0.0006924757,"about_ca_system_score_gemma":0.0004005179,"threshold_uncertainty_score":0.04614222},"labels":[],"label_agreement":null},{"id":"W1991760957","doi":"10.1061/(asce)1076-0342(2002)8:3(86)","title":"Modeling Bridge Deterioration Using Case-based Reasoning","year":2002,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":173,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University; McGill University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Bridge (graph theory); Reuse; Case-based reasoning; Computer science; Engineering; Construction engineering; Artificial intelligence","score_opus":0.01950439526824477,"score_gpt":0.22571220323236116,"score_spread":0.2062078079641164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991760957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05751803,0.00037449223,0.92444396,0.00056908507,0.000049243423,0.00063029956,0.00066005235,0.0017264338,0.01402838],"genre_scores_gemma":[0.39728698,0.00061361963,0.59730846,0.00007497971,0.00003188702,0.00043393587,0.00097275246,0.000057301088,0.003220071],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99849594,0.00050767453,0.00015092675,0.00017833585,0.00055480737,0.0001122686],"domain_scores_gemma":[0.9975357,0.0015682402,0.00018685783,0.0003265171,0.00033093482,0.000051821688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023750318,0.00094675267,0.0005677555,0.0018762033,0.000730416,0.0020920208,0.0026460662,0.0016649036,0.0029003955],"category_scores_gemma":[0.0060643503,0.0006534215,0.0011469481,0.0013695179,0.0011356885,0.0026133,0.0010491583,0.00093101745,0.0004274925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006590837,0.00017804954,0.0021594607,0.0001161685,0.000060785474,0.000810446,0.00038124216,0.9125505,0.0025372843,0.03631973,0.0015132506,0.043307163],"study_design_scores_gemma":[0.000026851816,0.000017510343,0.00024134551,0.000016589276,0.000027926344,0.00009128681,0.000042048414,0.9856162,0.0009224641,0.009993315,0.0029907182,0.0000138507385],"about_ca_topic_score_codex":0.049608618,"about_ca_topic_score_gemma":0.042439114,"teacher_disagreement_score":0.049608618,"about_ca_system_score_codex":0.002186782,"about_ca_system_score_gemma":0.0017705425,"threshold_uncertainty_score":0.09863973},"labels":[],"label_agreement":null},{"id":"W1994288985","doi":"10.1061/(asce)is.1943-555x.0000098","title":"Performance of Ductile Iron Pipes. II: Sampling Scheme and Inferring the Pipe Condition","year":2012,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Structural Integrity and Reliability Analysis","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Ductile iron; Corrosion; Water pipe; Sampling (signal processing); Geology; Geotechnical engineering; Cast iron; Metallurgy; Materials science; Engineering","score_opus":0.009363110848682183,"score_gpt":0.2266852891878591,"score_spread":0.2173221783391769,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994288985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9278782,0.000054795837,0.071219064,0.000023009494,0.0000024161957,0.00004926391,0.00011424702,0.00014341396,0.00051562424],"genre_scores_gemma":[0.9812856,0.000031089432,0.01834729,0.0000030602605,0.0000015831803,0.000017926557,0.00013188453,0.000009574315,0.00017198492],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999383,0.00019193007,0.000043273045,0.00011236941,0.00022501816,0.000044354238],"domain_scores_gemma":[0.9971892,0.001320867,0.0004842793,0.00041291636,0.0005145293,0.00007816285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014334715,0.0003341486,0.00026334627,0.00055141805,0.00026925368,0.00030642533,0.0005061117,0.000348473,0.00032966805],"category_scores_gemma":[0.005535847,0.0002651006,0.00018127699,0.0003820198,0.0003360238,0.0005372513,0.00046732204,0.00020879866,0.00014271557],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013851497,0.0002243199,0.4568417,0.00017936164,0.00008569571,0.0002861732,0.0009711445,0.14244795,0.21955606,0.000976864,0.00023531087,0.1768102],"study_design_scores_gemma":[0.0000253183,0.0010974896,0.25842407,0.000017203667,0.00003424831,0.0003523358,0.00026963546,0.62750185,0.11104793,0.0006791569,0.0005057264,0.000044951546],"about_ca_topic_score_codex":0.00520707,"about_ca_topic_score_gemma":0.009168059,"teacher_disagreement_score":0.00520707,"about_ca_system_score_codex":0.00041865697,"about_ca_system_score_gemma":0.00029166104,"threshold_uncertainty_score":0.010353506},"labels":[],"label_agreement":null},{"id":"W2005175228","doi":"10.1061/(asce)1076-0342(2000)6:1(41)","title":"Externally Bonded FRP for Service-Life Extension of RC Infrastructure","year":2000,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Fibre-reinforced plastic; Reinforcement; Service life; Flexural strength; Forensic engineering; Engineering; Materials science; Structural engineering; Composite material","score_opus":0.007747387751067041,"score_gpt":0.21965385507734475,"score_spread":0.21190646732627771,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005175228","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9300834,0.008800402,0.044044215,0.000187844,0.000047476915,0.00011728113,0.0001638059,0.00021352484,0.016342161],"genre_scores_gemma":[0.97369915,0.0037861876,0.018782265,0.000030743875,0.000014746205,0.000027555372,0.00010893207,0.000026381329,0.003524164],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99967563,0.000104800856,0.000011555123,0.000036630077,0.00014505698,0.000026389922],"domain_scores_gemma":[0.9995826,0.00017269587,0.00010017047,0.000032339234,0.00008611787,0.0000260521],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043826803,0.0002985126,0.00015912115,0.00094901136,0.00031364185,0.00020026708,0.0003017762,0.00023441101,0.0023996183],"category_scores_gemma":[0.0008297501,0.00009556453,0.000170418,0.0005488362,0.00016635192,0.00040254393,0.0002951428,0.00023851827,0.00050311926],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028700984,0.0001611546,0.0039741257,0.0012719324,0.000030681138,0.00053529546,0.00041978338,0.005235136,0.6411976,0.0012226492,0.0006452329,0.34501943],"study_design_scores_gemma":[0.00003082143,0.0033243885,0.04109657,0.00031896803,0.00014691577,0.0024163977,0.0009904448,0.0078051696,0.9027789,0.0012710252,0.039761487,0.000059002417],"about_ca_topic_score_codex":0.0007809273,"about_ca_topic_score_gemma":0.0038738672,"teacher_disagreement_score":0.0023996183,"about_ca_system_score_codex":0.00019750284,"about_ca_system_score_gemma":0.00031652141,"threshold_uncertainty_score":0.008027554},"labels":[],"label_agreement":null},{"id":"W2007338884","doi":"10.1061/(asce)1076-0342(2010)16:1(58)","title":"Methodology for Bayesian Belief Network Development to Facilitate Compliance with Water Quality Regulations","year":2010,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; Canadian Water Network","keywords":"Bayesian network; Decision support system; Quality (philosophy); Expert system; Risk analysis (engineering); Engineering; Computer science; Data mining; Artificial intelligence; Business","score_opus":0.06193563783537241,"score_gpt":0.2759375267648691,"score_spread":0.21400188892949668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2007338884","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008540204,0.000026959782,0.99804085,0.00008722541,0.00000609371,0.00012641166,0.000038985443,0.000114329174,0.00070515904],"genre_scores_gemma":[0.04420066,0.00009497596,0.9540074,0.00006141643,0.000018334711,0.0009101651,0.0001849294,0.000038734048,0.00048342056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9909524,0.005866907,0.0006255871,0.000745281,0.001561785,0.00024803766],"domain_scores_gemma":[0.97052944,0.024204705,0.0012654389,0.0005368481,0.0031724917,0.0002910734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014345139,0.0014147554,0.0011730175,0.0033089642,0.0010876154,0.0022031676,0.0027687526,0.0016133784,0.0055810898],"category_scores_gemma":[0.044966772,0.0010740524,0.0015013316,0.0018582641,0.0011457502,0.002164773,0.0027316695,0.0026462914,0.000786768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000111145935,0.00015129765,0.0015021627,0.00042650965,0.00018705317,0.00021785947,0.0006819887,0.7017875,0.0012490778,0.1181472,0.0019629505,0.17357531],"study_design_scores_gemma":[0.000033526856,0.000033816792,0.000116816635,0.00006977475,0.00003216145,0.000032434815,0.00006222103,0.950782,0.0008284464,0.045637105,0.0023538382,0.00001787226],"about_ca_topic_score_codex":0.006702311,"about_ca_topic_score_gemma":0.007387344,"teacher_disagreement_score":0.014345139,"about_ca_system_score_codex":0.0026226481,"about_ca_system_score_gemma":0.004310558,"threshold_uncertainty_score":0.07586527},"labels":[],"label_agreement":null},{"id":"W2009392061","doi":"10.1061/(asce)is.1943-555x.0000220","title":"Identifying Rehabilitation Options for Optimum Improvement in Municipal Asset Condition","year":2014,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Asset (computer security); Asset management; Service (business); Portfolio; IT asset management; Risk analysis (engineering); Business; Sustainability; Environmental economics; Process management; Computer science; Finance; Economics; Marketing; Computer security","score_opus":0.006357224346525315,"score_gpt":0.2530854065117675,"score_spread":0.24672818216524217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2009392061","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4683115,0.00044189845,0.5032802,0.00080373907,0.000015773347,0.00066549086,0.00041667937,0.00046717885,0.02559748],"genre_scores_gemma":[0.90710014,0.00019096796,0.090698995,0.000018137396,0.0000038113888,0.00018749697,0.00012712902,0.00002277264,0.0016505258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989254,0.00040649108,0.000057485457,0.00014221345,0.000246653,0.00022176775],"domain_scores_gemma":[0.99904937,0.00042538275,0.0002029145,0.000065452296,0.00018659906,0.00007021391],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013770917,0.0007056466,0.00084545807,0.0022291702,0.00075627316,0.002663217,0.00089568045,0.0014860202,0.0037556922],"category_scores_gemma":[0.0038770204,0.00034975022,0.0007403564,0.001391912,0.0007228567,0.0021730505,0.0015392042,0.00062092516,0.00032172966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022970838,0.00032780351,0.018211085,0.0005063588,0.000070260234,0.0004107168,0.0011011548,0.73599535,0.019993193,0.044389155,0.0017319021,0.17703328],"study_design_scores_gemma":[0.0000349714,0.00041996647,0.011398673,0.00019382205,0.000085435604,0.00015022226,0.0041292575,0.93748593,0.007587713,0.034357674,0.0040829447,0.00007336135],"about_ca_topic_score_codex":0.007315908,"about_ca_topic_score_gemma":0.020006694,"teacher_disagreement_score":0.007315908,"about_ca_system_score_codex":0.0025851573,"about_ca_system_score_gemma":0.0035489814,"threshold_uncertainty_score":0.018756747},"labels":[],"label_agreement":null},{"id":"W2021826536","doi":"10.1061/(asce)is.1943-555x.0000165","title":"Civil Infrastructure Decision Making as a Chaotic Sociotechnical System: Role of Information Systems in Engaging Stakeholders and Democratizing Innovation","year":2013,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Complex Systems and Decision Making","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Sociotechnical system; Collective intelligence; Knowledge management; Web 2.0; Crowdsourcing; Social media; Knowledge sharing; Information infrastructure; World Wide Web; Public relations; Sociology; Computer science; The Internet; Engineering; Political science; Information system","score_opus":0.03841995327878131,"score_gpt":0.314491963422731,"score_spread":0.27607201014394966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021826536","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09246088,0.013244435,0.2549599,0.18331118,0.0012225613,0.00047185144,0.00023430672,0.00047745486,0.45361745],"genre_scores_gemma":[0.9421654,0.0050959326,0.04088334,0.0033423258,0.0005624507,0.0003356199,0.000080196725,0.00013503425,0.007399598],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.988113,0.00772622,0.00035477738,0.0011478208,0.0017566775,0.0009015486],"domain_scores_gemma":[0.9791824,0.014106244,0.001654988,0.0019318938,0.0014289725,0.0016955037],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.0153990025,0.00090807554,0.0008120659,0.0042079864,0.006630775,0.027793266,0.0024357694,0.0074697696,0.005334836],"category_scores_gemma":[0.014944672,0.000773109,0.00097616384,0.0032202625,0.04548245,0.023844028,0.011868315,0.005270808,0.0010416519],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029562936,0.0000717439,0.0017814913,0.00026699444,0.000057415862,0.00025796526,0.016548121,0.0041997195,0.0006048553,0.95404863,0.003469464,0.018664148],"study_design_scores_gemma":[0.00002588176,0.000043800126,0.0008348606,0.00033942697,0.00002555716,0.00010266546,0.008719597,0.005507149,0.00035987157,0.9123319,0.0716528,0.00005652934],"about_ca_topic_score_codex":0.0041656075,"about_ca_topic_score_gemma":0.0029401528,"teacher_disagreement_score":0.9933692,"about_ca_system_score_codex":0.007916593,"about_ca_system_score_gemma":0.010392919,"threshold_uncertainty_score":0.08143872},"labels":[],"label_agreement":null},{"id":"W2022729100","doi":"10.1061/(asce)1076-0342(2003)9:1(26)","title":"Reconstruction of the Building Infrastructure: Two Performance Prediction Models","year":2003,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Professional Engineers Ontario","funders":"","keywords":"Schedule; Computer science; Work (physics); Quality (philosophy); Engineering; Transport engineering; Risk analysis (engineering); Operations research; Business","score_opus":0.005035586666480134,"score_gpt":0.18833891217307558,"score_spread":0.18330332550659545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022729100","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75780207,0.00024472503,0.23061071,0.00087528524,0.000045709912,0.00017696094,0.00090875983,0.0004824286,0.00885342],"genre_scores_gemma":[0.98892283,0.00009611823,0.008534141,0.00002843852,0.0000111838235,0.000118771255,0.0002494649,0.000018862007,0.0020201101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993631,0.00022254771,0.000028396651,0.00014784366,0.00012093203,0.00011724097],"domain_scores_gemma":[0.9978509,0.0013946878,0.0003019064,0.00009694688,0.00029407724,0.00006158007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001825591,0.0010679908,0.00071484025,0.00091226905,0.00033653644,0.0011906974,0.0014241834,0.0014816936,0.0019618762],"category_scores_gemma":[0.0046615303,0.00052930816,0.00085539394,0.0007303934,0.00067806576,0.0010799257,0.00056053634,0.0010819101,0.0003036625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002399011,0.00002359364,0.0009821594,0.0000052931578,0.0000059877834,0.0000107187525,0.000014167887,0.99657273,0.00010579009,0.0006039182,0.000075919284,0.001575771],"study_design_scores_gemma":[0.0000039405045,0.000012981777,0.00045133024,0.0000013825958,0.0000038453595,0.0000033256824,0.0000053628437,0.99899226,0.00008965049,0.00038921367,0.000042844626,0.0000038377575],"about_ca_topic_score_codex":0.026139101,"about_ca_topic_score_gemma":0.008821255,"teacher_disagreement_score":0.026139101,"about_ca_system_score_codex":0.0018399293,"about_ca_system_score_gemma":0.0009565217,"threshold_uncertainty_score":0.05197394},"labels":[],"label_agreement":null},{"id":"W2039045033","doi":"10.1061/(asce)1076-0342(2007)13:1(43)","title":"System Risk Curves: Probabilistic Performance Scenarios for Highway Networks Subject to Earthquake Damage","year":2007,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":116,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Engineering Research Centers; U.S. Department of Transportation; National Science Foundation","keywords":"Bridge (graph theory); Fragility; Seismic hazard; Computer science; Probabilistic logic; Monte Carlo method; Earthquake scenario; Transport engineering; Engineering; Civil engineering; Forensic engineering; Statistics; Mathematics","score_opus":0.008486943629711308,"score_gpt":0.25500932354478506,"score_spread":0.24652237991507375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2039045033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5580185,0.0009488018,0.37681013,0.0014641653,0.00009261181,0.0010983057,0.006812054,0.00096003903,0.053795375],"genre_scores_gemma":[0.9768023,0.00030898157,0.018932048,0.00003863804,0.0000142670115,0.00040189165,0.0010300222,0.000064929576,0.002406863],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979,0.0013791751,0.000053571104,0.00011077686,0.00034657994,0.00020998353],"domain_scores_gemma":[0.99265397,0.0056384085,0.00047460082,0.0003375842,0.0006464291,0.00024888667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048272405,0.0012744677,0.0007397993,0.002541626,0.0005456322,0.0014005523,0.0013129464,0.0016101534,0.004925454],"category_scores_gemma":[0.01408782,0.00043269584,0.0010382412,0.0017933839,0.0008457977,0.001594561,0.0013239023,0.0010542108,0.00037339175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004825879,0.000018728288,0.0006527783,0.000015857822,0.00001360467,0.00005435784,0.000034085366,0.9830965,0.000088196735,0.013299035,0.000626288,0.0020524259],"study_design_scores_gemma":[0.000015269366,0.000061814644,0.00055975694,0.00001459703,0.000008625177,0.000037318394,0.000056163244,0.9860551,0.00014625811,0.012305602,0.000725627,0.000013934536],"about_ca_topic_score_codex":0.008650677,"about_ca_topic_score_gemma":0.0050796247,"teacher_disagreement_score":0.008650677,"about_ca_system_score_codex":0.0022881352,"about_ca_system_score_gemma":0.0007409687,"threshold_uncertainty_score":0.025529206},"labels":[],"label_agreement":null},{"id":"W2054083568","doi":"10.1061/(asce)1076-0342(2004)10:2(43)","title":"Quantifying Effectiveness of Cathodic Protection in Water Mains: Theory","year":2004,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Cathodic protection; Mains electricity; Electricity; Computer science; Environmental science; Reliability engineering; Risk analysis (engineering); Engineering; Business; Electrical engineering; Voltage; Electrochemistry","score_opus":0.00843540695914511,"score_gpt":0.20724560581192894,"score_spread":0.19881019885278384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2054083568","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025440037,0.0017745824,0.9537867,0.00090831675,0.000062618645,0.00014355329,0.00018575264,0.00013443414,0.017564045],"genre_scores_gemma":[0.87881047,0.004528001,0.108933225,0.00028833278,0.00014282686,0.000556887,0.00015128584,0.00009631577,0.0064926744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99786204,0.0007355993,0.000090959,0.00032717007,0.00070743955,0.0002767533],"domain_scores_gemma":[0.9930582,0.0052688206,0.0007273437,0.00028314258,0.00055798155,0.000104602135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037369288,0.0015089579,0.0010934689,0.0019731994,0.0005471712,0.0027374327,0.0025018705,0.0029313369,0.0035432477],"category_scores_gemma":[0.01150406,0.00089673465,0.001322572,0.001522373,0.003709714,0.005398575,0.0019266346,0.0016905755,0.0004426917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017607377,0.00006069453,0.0005669516,0.00016520826,0.000029315266,0.000029502284,0.00006396354,0.8912599,0.0010848895,0.098141864,0.0004761595,0.008103852],"study_design_scores_gemma":[0.000009827566,0.00009592814,0.00054032163,0.00006844164,0.000025501513,0.000040543295,0.00006499718,0.9278755,0.0012107617,0.06855051,0.001489253,0.000028307235],"about_ca_topic_score_codex":0.0074493526,"about_ca_topic_score_gemma":0.0032244837,"teacher_disagreement_score":0.0074493526,"about_ca_system_score_codex":0.0036230695,"about_ca_system_score_gemma":0.0017547572,"threshold_uncertainty_score":0.026287317},"labels":[],"label_agreement":null},{"id":"W2062718227","doi":"10.1061/(asce)is.1943-555x.0000052","title":"Integrating WRc and CERIU Condition Assessment Models and Classification Protocols for Sewer Pipelines","year":2011,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University; SNC-Lavalin (Canada)","funders":"Fonds Québécois de la Recherche sur la Nature et les Technologies","keywords":"Sanitary sewer; Protocol (science); Pipeline transport; Artificial neural network; Pipeline (software); Engineering; Computer science; Process (computing); Civil engineering; Artificial intelligence; Environmental engineering","score_opus":0.03299983506325369,"score_gpt":0.29016785204455897,"score_spread":0.25716801698130526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062718227","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09449032,0.00012732348,0.8904037,0.00038479944,0.000049271377,0.00104439,0.0007397815,0.0029425605,0.009817847],"genre_scores_gemma":[0.67697346,0.00027590012,0.31315145,0.00006937474,0.00002973731,0.0016932647,0.0018750377,0.00018177109,0.0057500466],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962322,0.00074990455,0.0004077071,0.0005355887,0.0018762576,0.00019833424],"domain_scores_gemma":[0.9934135,0.0011621064,0.000813377,0.0007004717,0.0037815338,0.0001290284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004752184,0.00098052,0.00087452144,0.0022733135,0.0006671631,0.0022492753,0.0022306554,0.0010937231,0.0013387755],"category_scores_gemma":[0.010792435,0.0005157433,0.00085880526,0.0014992744,0.0007555643,0.0035680772,0.0013083222,0.001256548,0.0004799805],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018423931,0.00029888828,0.017380051,0.00017949457,0.00008518859,0.00009697256,0.000495724,0.7900192,0.006979195,0.009745934,0.00345857,0.17107655],"study_design_scores_gemma":[0.000012529967,0.000078859695,0.005479294,0.000035490757,0.00003077597,0.000036245594,0.00012488959,0.9831834,0.005398246,0.002959565,0.002614172,0.000046518704],"about_ca_topic_score_codex":0.035497095,"about_ca_topic_score_gemma":0.04323088,"teacher_disagreement_score":0.035497095,"about_ca_system_score_codex":0.00525233,"about_ca_system_score_gemma":0.0055495324,"threshold_uncertainty_score":0.07058096},"labels":[],"label_agreement":null},{"id":"W2063505935","doi":"10.1061/(asce)is.1943-555x.0000126","title":"Simulating Freight Traffic between Atlantic Canada and Québec to Support Pavement Management on New Brunswick’s Regional Highways","year":2012,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Transport engineering; Truck; Traffic management; Estimation; Environmental science; Land use; Asset management; TRIPS architecture; Distribution (mathematics); Environmental resource management; Engineering; Civil engineering; Business","score_opus":0.016462156860653016,"score_gpt":0.2537276003200261,"score_spread":0.2372654434593731,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2063505935","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99350005,0.000038600665,0.0012156274,0.0002027422,0.000012740833,0.000040967414,0.0009166718,0.000047385678,0.004025133],"genre_scores_gemma":[0.9950956,0.000051108746,0.0018643481,0.000028321081,0.0000029517348,0.000020383273,0.00075690844,0.000011369609,0.0021690342],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997812,0.000055588374,0.000007157835,0.0000370213,0.000028169368,0.00009096531],"domain_scores_gemma":[0.99939835,0.00022901205,0.00004014113,0.000024672894,0.00020654955,0.00010119949],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005494386,0.00069437164,0.00033578105,0.00055977446,0.0012912534,0.0011504221,0.0013358952,0.0008590799,0.0023108877],"category_scores_gemma":[0.0011717046,0.0003398552,0.00061271107,0.0008692146,0.0006101941,0.00049807655,0.00039025626,0.0006421048,0.00012184487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007098098,0.00009825014,0.013929235,0.00001183216,0.00003091985,0.00008021314,0.000051506966,0.98194146,0.00034569128,0.00062086765,0.0006394826,0.0021794245],"study_design_scores_gemma":[0.00002376678,0.000028470919,0.0075751552,0.000004096918,0.0000125746465,0.0000048907914,0.00019880198,0.99149793,0.00018987067,0.00008495875,0.0003698852,0.00000966787],"about_ca_topic_score_codex":0.9816461,"about_ca_topic_score_gemma":0.983269,"teacher_disagreement_score":0.021095548,"about_ca_system_score_codex":0.021095548,"about_ca_system_score_gemma":0.011260259,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W2066886388","doi":"10.1061/(asce)is.1943-555x.0000159","title":"Application of Dormant Reliability Analysis to Spillways","year":2013,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Hydraulic flow and structures","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"U.S. Army Corps of Engineers; Bureau of Reclamation","keywords":"Spillway; Unavailability; Reliability (semiconductor); Engineering; Reliability engineering; Population; Environmental science; Geotechnical engineering","score_opus":0.0017947210907610233,"score_gpt":0.1866794551324874,"score_spread":0.18488473404172637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066886388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26623443,0.00024510338,0.7313638,0.00006264162,0.000013544409,0.000057039546,0.000119845805,0.00047502117,0.001428602],"genre_scores_gemma":[0.95340115,0.00012274797,0.045826618,0.000009634336,0.00001407062,0.000029066716,0.000088385226,0.000034622884,0.0004737029],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992893,0.00027125695,0.000041379757,0.00011114967,0.00022649286,0.000060447852],"domain_scores_gemma":[0.99541533,0.0024675194,0.0008262026,0.00048565038,0.0006902365,0.00011491978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001174259,0.000626842,0.00044570083,0.0017746827,0.00032573755,0.00057638285,0.0006151869,0.0003297193,0.0004916225],"category_scores_gemma":[0.0065949396,0.00024160866,0.00061443064,0.00058110745,0.00062279025,0.00075740984,0.0005736336,0.0006668129,0.0001251999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023177898,0.00009978124,0.025933878,0.0001406701,0.0001069216,0.00038062263,0.00045066365,0.7630079,0.044837184,0.012302683,0.00035050503,0.15215738],"study_design_scores_gemma":[0.000005011909,0.00024916528,0.007752679,0.0000136095605,0.000025982019,0.00016234937,0.00004774333,0.9733671,0.0117162485,0.0059895613,0.00064069557,0.000029892633],"about_ca_topic_score_codex":0.0035412381,"about_ca_topic_score_gemma":0.0021841927,"teacher_disagreement_score":0.0035412381,"about_ca_system_score_codex":0.0005271864,"about_ca_system_score_gemma":0.00050606596,"threshold_uncertainty_score":0.007041216},"labels":[],"label_agreement":null},{"id":"W2072208350","doi":"10.1061/(asce)1076-0342(2005)11:2(110)","title":"Taxonomy for Outside Plant Construction in Telecommunication Infrastructure: Supporting Knowledge-Based Virtual Teaming","year":2005,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Service-Oriented Architecture and Web Services","field":"Computer Science","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Taxonomy (biology); Computer science; Knowledge management; Semantic Web; Information exchange; Process management; Engineering management; Systems engineering; Engineering; World Wide Web; Telecommunications","score_opus":0.010544554784635807,"score_gpt":0.24579286908232814,"score_spread":0.23524831429769233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072208350","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08988136,0.005128272,0.66895175,0.006313949,0.0006117218,0.0024345622,0.00079944346,0.0015268082,0.22435221],"genre_scores_gemma":[0.40948692,0.00485755,0.5551924,0.00060469296,0.00009551791,0.0018283428,0.002456814,0.00016195283,0.02531588],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9963308,0.0012096906,0.0006545974,0.00030982035,0.0009718779,0.0005232561],"domain_scores_gemma":[0.9960069,0.0009503165,0.00054711744,0.00065079296,0.001292929,0.0005519649],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026294584,0.0007707227,0.0005587914,0.005830716,0.0049298266,0.0050321105,0.0020602203,0.0034713305,0.003228021],"category_scores_gemma":[0.003797009,0.0004878643,0.0011339745,0.0049753035,0.005012146,0.010402147,0.002948298,0.0020252918,0.0014412949],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052200852,0.00019254592,0.0073894886,0.0010960328,0.000022997034,0.0011733455,0.02561302,0.0043975534,0.0029912018,0.78635204,0.013983069,0.1567365],"study_design_scores_gemma":[0.00003004995,0.00016084987,0.0075521944,0.0017498194,0.000045810913,0.0037200013,0.0255272,0.017076422,0.0015227159,0.32182917,0.62067413,0.00011166252],"about_ca_topic_score_codex":0.009680671,"about_ca_topic_score_gemma":0.012462816,"teacher_disagreement_score":0.009680671,"about_ca_system_score_codex":0.0037292587,"about_ca_system_score_gemma":0.0071708807,"threshold_uncertainty_score":0.027057767},"labels":[],"label_agreement":null},{"id":"W2078824956","doi":"10.1061/(asce)1076-0342(2004)10:4(149)","title":"Fuzzy-Based Method to Evaluate Soil Corrosivity for Prediction of Water Main Deterioration","year":2004,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":64,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Soil resistivity; Corrosion; Fuzzy logic; Soil science; Matrix (chemical analysis); Environmental science; Electrical resistivity and conductivity; Engineering; Computer science; Chemistry; Metallurgy; Artificial intelligence; Materials science","score_opus":0.08922411392218882,"score_gpt":0.41203675684281427,"score_spread":0.32281264292062545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078824956","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.078684,0.0002569283,0.91733193,0.00009054918,0.000056534034,0.00017490769,0.00021624475,0.00055945833,0.0026294433],"genre_scores_gemma":[0.72855884,0.00017980658,0.26927093,0.0000415258,0.00002702607,0.0001849188,0.00019610416,0.000013276191,0.0015276927],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999271,0.00019761198,0.000056996058,0.000098437915,0.00033514836,0.00004096316],"domain_scores_gemma":[0.9984609,0.0007264267,0.00016519599,0.000046717494,0.0005422348,0.000058483143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011955315,0.0007927857,0.0007886667,0.0023793639,0.00041635951,0.0008059665,0.00090552197,0.0007827575,0.0016950794],"category_scores_gemma":[0.0035945042,0.00027870692,0.0007207859,0.0009829712,0.00033656755,0.000660013,0.00031100077,0.00050932297,0.00043012202],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005955254,0.0005740736,0.023179734,0.00050501205,0.00035989966,0.00030719972,0.00029697004,0.41143143,0.035525445,0.004588134,0.0024887442,0.5201478],"study_design_scores_gemma":[0.00001577781,0.00015270991,0.0034234263,0.000022396001,0.000033225744,0.00008221083,0.000044703815,0.9909071,0.0038538238,0.0009242872,0.00049858703,0.000041860476],"about_ca_topic_score_codex":0.005638403,"about_ca_topic_score_gemma":0.0070367563,"teacher_disagreement_score":0.005638403,"about_ca_system_score_codex":0.0007043784,"about_ca_system_score_gemma":0.00068300916,"threshold_uncertainty_score":0.011211157},"labels":[],"label_agreement":null},{"id":"W2080776187","doi":"10.1061/(asce)1076-0342(2006)12:3(184)","title":"Optimal Scheduling of Replacement and Rehabilitation of Water Distribution Systems","year":2006,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Minification; Total cost; Scheduling (production processes); Operations research; Pipeline (software); Exponential distribution; Rehabilitation; Poisson process; Computer science; Pipeline transport; Poisson distribution; Mathematical optimization; Engineering; Mathematics; Statistics; Environmental engineering; Economics","score_opus":0.0022261917553837458,"score_gpt":0.17593391557074628,"score_spread":0.17370772381536254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080776187","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6140356,0.0006931015,0.3774542,0.00029673864,0.00008642953,0.00032893513,0.0002021138,0.000528597,0.006374309],"genre_scores_gemma":[0.98161215,0.00008343021,0.01691786,0.000013628429,0.0000099768395,0.00005592565,0.00007792816,0.00003045814,0.0011985719],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991721,0.0002749074,0.00003303373,0.00011725411,0.00013446175,0.00026836354],"domain_scores_gemma":[0.9988863,0.00045909118,0.00023614484,0.00006641323,0.00014515367,0.00020698506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001406389,0.00064808596,0.0010104221,0.0005613982,0.00060301926,0.00081319996,0.0009146633,0.000705176,0.00247385],"category_scores_gemma":[0.003164249,0.0006553862,0.00039120868,0.0004902252,0.0006983931,0.00077871943,0.00044333487,0.00060525973,0.00024317837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015700099,0.000051715546,0.0008540772,0.0000344915,0.000013045346,0.000051466246,0.00003918196,0.98174083,0.0019346282,0.0015276944,0.00038342553,0.013212491],"study_design_scores_gemma":[0.000028384933,0.00012087937,0.0009056266,0.000004305089,0.000011272113,0.000018072216,0.000049535232,0.9957312,0.0010759332,0.0015323553,0.0005135003,0.000008998918],"about_ca_topic_score_codex":0.012212308,"about_ca_topic_score_gemma":0.0097270375,"teacher_disagreement_score":0.012212308,"about_ca_system_score_codex":0.001990959,"about_ca_system_score_gemma":0.0021623436,"threshold_uncertainty_score":0.024282455},"labels":[],"label_agreement":null},{"id":"W2085551846","doi":"10.1061/(asce)1076-0342(2008)14:3(272)","title":"Discussion of “Prediction of Water Pipe Asset Life Using Neural Networks” by D. Achim, F. Ghotb, and K. J. McManus","year":2008,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Artificial neural network; Asset (computer security); Engineering; Operations research; Computer science; Artificial intelligence; Computer security","score_opus":0.00692616076646919,"score_gpt":0.1820893027280745,"score_spread":0.17516314196160532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2085551846","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008584226,0.026044162,0.2609102,0.662524,0.019233054,0.00007602787,0.0004047356,0.00017205469,0.022051567],"genre_scores_gemma":[0.5070332,0.03855823,0.12368425,0.1833411,0.07486298,0.000623285,0.00043294585,0.00030900977,0.071154974],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977489,0.0011706762,0.00011582203,0.00036416843,0.0005209154,0.00007938195],"domain_scores_gemma":[0.9963527,0.0025530069,0.00013068283,0.00015209986,0.00073472556,0.000076789394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046185204,0.000719035,0.00080380286,0.00069603825,0.0012629981,0.0025673148,0.0028727234,0.007149654,0.00304091],"category_scores_gemma":[0.016561072,0.0005042002,0.0012397033,0.0014114986,0.0029734871,0.0038437415,0.0014577071,0.006360113,0.00089764805],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000927731,0.000053926957,0.0014874347,0.00032945952,0.00017553654,0.00028898584,0.00017802289,0.10689445,0.00082560343,0.694357,0.15088387,0.044433042],"study_design_scores_gemma":[0.00004326556,0.000057850237,0.0009877745,0.0003058655,0.000046146688,0.000121928686,0.00011650726,0.19306771,0.001775787,0.72414744,0.07925206,0.00007766625],"about_ca_topic_score_codex":0.009501362,"about_ca_topic_score_gemma":0.0073932232,"teacher_disagreement_score":0.009501362,"about_ca_system_score_codex":0.0018737197,"about_ca_system_score_gemma":0.0010222114,"threshold_uncertainty_score":0.024425387},"labels":[],"label_agreement":null},{"id":"W2086848434","doi":"10.1061/(asce)is.1943-555x.0000180","title":"Cost Optimization of Hydraulic and Structural Rehabilitation of Urban Drainage Network","year":2013,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Urban Stormwater Management Solutions","field":"Environmental Science","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Context (archaeology); Rehabilitation; Drainage; Surface runoff; Environmental science; Risk analysis (engineering); Business","score_opus":0.005148241051463333,"score_gpt":0.20149202139038597,"score_spread":0.19634378033892264,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2086848434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4888664,0.0008779303,0.49143374,0.0012318821,0.000059649883,0.0004818901,0.00039011324,0.00045601162,0.016202368],"genre_scores_gemma":[0.9468843,0.00015457509,0.050013,0.000056862667,0.000011672498,0.00017635731,0.00014011453,0.000039283335,0.002523824],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995384,0.00020214578,0.000018034778,0.00006383868,0.000059165133,0.00011846593],"domain_scores_gemma":[0.9984896,0.0010295706,0.00015140873,0.0000384585,0.00017583766,0.00011506459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012709657,0.000999059,0.0011504841,0.00101214,0.0004918789,0.001124065,0.001060105,0.0014592182,0.002734356],"category_scores_gemma":[0.003059701,0.00057996035,0.00046687276,0.00079675455,0.0007247425,0.001004037,0.0009303228,0.00051885954,0.00017789299],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030161395,0.000019364597,0.00042739318,0.00001679583,0.000007613082,0.000016584961,0.0000079412675,0.9934633,0.00013171506,0.00058055716,0.0001253077,0.0051732883],"study_design_scores_gemma":[0.00000901845,0.00003169056,0.00019984174,0.0000037836814,0.000006088929,0.000006205613,0.000016409438,0.99897313,0.00011748505,0.00051582966,0.000118092765,0.0000023987093],"about_ca_topic_score_codex":0.010245493,"about_ca_topic_score_gemma":0.008917413,"teacher_disagreement_score":0.010245493,"about_ca_system_score_codex":0.002161425,"about_ca_system_score_gemma":0.0015458976,"threshold_uncertainty_score":0.020371735},"labels":[],"label_agreement":null},{"id":"W2093055894","doi":"10.1061/(asce)1076-0342(2007)13:4(261)","title":"Life-Cycle Energy Use and Greenhouse Gas Emissions Inventory for Water Treatment Systems","year":2007,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Wastewater Treatment and Reuse","field":"Environmental Science","cited_by":191,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"Canadian Water Network","keywords":"Greenhouse gas; Life-cycle assessment; Environmental science; Environmental engineering; Climate change; Water use; Production (economics); Economics","score_opus":0.010890615159980209,"score_gpt":0.2154976090152846,"score_spread":0.2046069938553044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093055894","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86878407,0.0009649482,0.036868658,0.00020908649,0.00001664491,0.00035912503,0.07881947,0.00051364634,0.013464371],"genre_scores_gemma":[0.93968326,0.000867587,0.012817484,0.00002844635,0.0000063643015,0.00015201111,0.04221234,0.00005424441,0.004178234],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997192,0.00004665052,0.000025045827,0.000033639295,0.0001373327,0.000038120023],"domain_scores_gemma":[0.999516,0.00011125655,0.00006979075,0.000059897073,0.00022303243,0.00002000981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048316416,0.0005402633,0.00033188998,0.0019388103,0.0004167725,0.00058905105,0.000539592,0.0002061426,0.0012694128],"category_scores_gemma":[0.00072699384,0.0003096419,0.00062734226,0.0022723328,0.00019895687,0.0006791358,0.00022006141,0.00023007987,0.00030762542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026340352,0.00011998269,0.0718099,0.0004419537,0.00019629562,0.00022996057,0.00020849316,0.84009993,0.013608111,0.002918125,0.0033010538,0.06680285],"study_design_scores_gemma":[0.00003646299,0.00022923115,0.17656131,0.0000735324,0.00020321776,0.00012268526,0.0002985083,0.74872315,0.03569996,0.0024348695,0.035512894,0.000104143684],"about_ca_topic_score_codex":0.3089612,"about_ca_topic_score_gemma":0.40705255,"teacher_disagreement_score":0.3089612,"about_ca_system_score_codex":0.007376976,"about_ca_system_score_gemma":0.0041890433,"threshold_uncertainty_score":0.6143257},"labels":[],"label_agreement":null},{"id":"W2120985387","doi":"10.1061/(asce)1076-0342(2003)9:1(35)","title":"Real-Time Monitoring for Quality Delivery of Directional Drilling Installations","year":2003,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"","keywords":"Trenchless technology; Quality assurance; Directional drilling; Quality (philosophy); Drilling; Engineering; Load cell; Load management; Control (management); Pipeline transport; Reliability engineering; Computer science; Operations management; Mechanical engineering; Electrical engineering","score_opus":0.00968378730160072,"score_gpt":0.23652337317771713,"score_spread":0.2268395858761164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120985387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55401605,0.0017849273,0.4235604,0.00028616688,0.00011566367,0.00031828525,0.0019497902,0.007521184,0.010447546],"genre_scores_gemma":[0.9085781,0.00067418534,0.0864658,0.00007252088,0.000060486713,0.00010787016,0.0008826019,0.00013128843,0.003027174],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986405,0.00017468412,0.0000511574,0.00017827628,0.00089600595,0.000059414742],"domain_scores_gemma":[0.9982666,0.00043839525,0.00045140038,0.0001624998,0.0006199835,0.00006114239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006977258,0.0003261953,0.00031819363,0.0016356177,0.00030034222,0.0005740525,0.0006112948,0.0004199286,0.0016749599],"category_scores_gemma":[0.0022309378,0.00020242935,0.00011779693,0.0011201821,0.00022282942,0.0006810056,0.00035235076,0.0003071554,0.00069998327],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085780345,0.00022290496,0.07114384,0.00056928914,0.00004552552,0.00023914849,0.00079932134,0.014609771,0.2168787,0.0012454997,0.0037965588,0.68959165],"study_design_scores_gemma":[0.00022169498,0.0030335481,0.29868346,0.00021793596,0.00021879167,0.0016367005,0.0011127753,0.2663119,0.3594619,0.0026985581,0.066141166,0.00026155234],"about_ca_topic_score_codex":0.001354094,"about_ca_topic_score_gemma":0.0019223345,"teacher_disagreement_score":0.0016749599,"about_ca_system_score_codex":0.00035616485,"about_ca_system_score_gemma":0.00032378358,"threshold_uncertainty_score":0.005603254},"labels":[],"label_agreement":null},{"id":"W2122107434","doi":"10.1061/(asce)1076-0342(2004)10:2(69)","title":"Effectiveness of Ground Penetrating Radar in Predicting Deck Repair Quantities","year":2004,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Geophysical Methods and Applications","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"Ministère des Transports","keywords":"Ground-penetrating radar; Deck; Visual inspection; Radar; Environmental science; Bridge deck; Geotechnical engineering; Structural engineering; Geology; Forensic engineering; Engineering; Statistics; Mathematics","score_opus":0.007128685700244749,"score_gpt":0.24362857795111337,"score_spread":0.23649989225086862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122107434","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9417042,0.0003749344,0.056037977,0.000045941582,0.000017073511,0.000026712723,0.00016426257,0.0004910964,0.0011377787],"genre_scores_gemma":[0.97880906,0.00012380598,0.020629797,0.000015131222,0.0000065911795,0.000007723321,0.00011519326,0.000011172204,0.0002815505],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991542,0.00041845907,0.000039944534,0.00015719379,0.0001852517,0.00004497737],"domain_scores_gemma":[0.9953929,0.0035455995,0.00032842119,0.00021673494,0.00043057083,0.00008570124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00167613,0.0006927909,0.0003947549,0.0008011062,0.00010989659,0.00054639834,0.00027793212,0.0005493781,0.00038268368],"category_scores_gemma":[0.0075115194,0.0002442503,0.00018819087,0.00034378128,0.00020452349,0.00075863604,0.0002892866,0.00027957882,0.0003106638],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024862636,0.00034203994,0.32677042,0.00023062201,0.00017971614,0.00029416356,0.00013426034,0.23465474,0.051636424,0.0003204193,0.00058576546,0.38236514],"study_design_scores_gemma":[0.00003947818,0.0013395374,0.106100075,0.000027543812,0.00010354697,0.00044622898,0.00013837522,0.87178516,0.019271642,0.0002757279,0.0004366356,0.000036091966],"about_ca_topic_score_codex":0.0012280078,"about_ca_topic_score_gemma":0.0015228108,"teacher_disagreement_score":0.00167613,"about_ca_system_score_codex":0.00010951464,"about_ca_system_score_gemma":0.00018334822,"threshold_uncertainty_score":0.008864343},"labels":[],"label_agreement":null},{"id":"W2126143858","doi":"10.1061/(asce)is.1943-555x.0000273","title":"Holistic Analysis of Infrastructure Deterioration and Rehabilitation Using System Dynamics","year":2015,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rehabilitation; Operability; Process (computing); Causal loop diagram; Risk analysis (engineering); System dynamics; Plan (archaeology); Asset (computer security); Computer science; Process management; Management science; Engineering; Business; Computer security; Reliability engineering","score_opus":0.010529681793902844,"score_gpt":0.2485355881342812,"score_spread":0.23800590634037835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2126143858","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38619697,0.00079838815,0.5866622,0.00077413727,0.000051477688,0.0002373479,0.0006109434,0.00027510658,0.024393434],"genre_scores_gemma":[0.9876825,0.00040916709,0.010114412,0.00002376515,0.000011758647,0.00013136353,0.00008821475,0.00001648346,0.0015222945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996903,0.0001273405,0.000013434653,0.000057942496,0.00006181025,0.000049176513],"domain_scores_gemma":[0.99947447,0.0003295233,0.0000938706,0.000019967802,0.00005442366,0.00002769451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005594512,0.00081486,0.0006460287,0.0009268788,0.00045066664,0.001379406,0.00057340396,0.0008338026,0.0020372227],"category_scores_gemma":[0.0015354325,0.00031498974,0.0007825002,0.0006165043,0.0007865716,0.0015931171,0.0012474997,0.00073078985,0.000107617685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008811565,0.000017656565,0.0018586834,0.000030404493,0.000029035336,0.00006760092,0.00005984839,0.98371917,0.0006914364,0.010958051,0.00007895122,0.0024804862],"study_design_scores_gemma":[0.0000028990344,0.000020074236,0.0008907379,0.0000070420574,0.00001062658,0.00001542388,0.000065392735,0.9926118,0.00011255092,0.0059361495,0.00032004545,0.0000071641703],"about_ca_topic_score_codex":0.0116548175,"about_ca_topic_score_gemma":0.006805643,"teacher_disagreement_score":0.0116548175,"about_ca_system_score_codex":0.0012820105,"about_ca_system_score_gemma":0.0015426839,"threshold_uncertainty_score":0.023173988},"labels":[],"label_agreement":null},{"id":"W2136010411","doi":"10.1061/(asce)1076-0342(2007)13:4(271)","title":"Life-Cycle Inventory of Energy Use and Greenhouse Gas Emissions for Two Hydropower Projects in China","year":2007,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water-Energy-Food Nexus Studies","field":"Environmental Science","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Carnegie Mellon University","keywords":"Greenhouse gas; Hydropower; Life-cycle assessment; Renewable energy; Life cycle inventory; Environmental science; Sustainability; Electricity; Electricity generation; Environmental impact assessment; Environmental engineering; Production (economics); Natural resource economics; Engineering; Economics; Ecology","score_opus":0.010122841498466538,"score_gpt":0.2326839188463796,"score_spread":0.22256107734791306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136010411","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9946537,0.00007774448,0.0015668472,0.000028788047,0.0000013718025,0.000041884286,0.002942308,0.000027292806,0.00065995863],"genre_scores_gemma":[0.993993,0.000092425274,0.0010298819,0.000007382019,0.0000013516611,0.00005946779,0.0040266044,0.0000053455005,0.0007846261],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9997937,0.000033917135,0.000021627331,0.000035977224,0.00007197837,0.00004285149],"domain_scores_gemma":[0.9994771,0.00012744636,0.00009290632,0.00006201533,0.00018566572,0.000054909167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007841191,0.00060005265,0.00040423765,0.0017073683,0.00042620787,0.00050382543,0.00068051834,0.00029150702,0.0009105999],"category_scores_gemma":[0.0007417154,0.0005673557,0.0007351741,0.0015342159,0.00025315638,0.0007494714,0.00032016638,0.00022699639,0.00011345206],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036136011,0.00018300129,0.15529542,0.00014089377,0.0002723821,0.0005631351,0.00014387668,0.80871475,0.0061151297,0.00092505093,0.00046920113,0.026815759],"study_design_scores_gemma":[0.00007956013,0.00032394088,0.28744474,0.00002871823,0.00021082774,0.00013706424,0.00023050068,0.7015757,0.0061040064,0.0011131975,0.002674617,0.000077138364],"about_ca_topic_score_codex":0.10797612,"about_ca_topic_score_gemma":0.10032564,"teacher_disagreement_score":0.10797612,"about_ca_system_score_codex":0.003571909,"about_ca_system_score_gemma":0.0020319452,"threshold_uncertainty_score":0.21469527},"labels":[],"label_agreement":null},{"id":"W2136783427","doi":"10.1061/(asce)is.1943-555x.0000275","title":"An Integrated Productivity-Practices Implementation Index for Planning the Execution of Infrastructure Projects","year":2015,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Construction Industry Council","keywords":"Productivity; Index (typography); Business; Computer science; Critical infrastructure; Engineering management; Operations research; Engineering; Operations management; Process management; Computer security; Economics","score_opus":0.12214847885875682,"score_gpt":0.436768042253596,"score_spread":0.3146195633948392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136783427","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6736959,0.0013021847,0.23202024,0.001219442,0.00016868894,0.0026563401,0.008528329,0.0019703265,0.0784386],"genre_scores_gemma":[0.73087764,0.00063438516,0.2567198,0.000065864944,0.00003974212,0.0015400636,0.006685117,0.00007810199,0.0033592659],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9888416,0.0025896234,0.0015668432,0.00051438936,0.006033327,0.0004542419],"domain_scores_gemma":[0.9735371,0.0073205717,0.008196796,0.0014137125,0.008133127,0.0013986862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008966736,0.0007604289,0.0006357715,0.009463445,0.0007035496,0.0026535352,0.0010080189,0.0005052947,0.0026778078],"category_scores_gemma":[0.024711762,0.0002860318,0.0007582133,0.008332275,0.00040173507,0.0024493004,0.0019804556,0.0008353322,0.00064428285],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002159576,0.0009950452,0.34017998,0.0011751376,0.0003413594,0.0001076062,0.0018988842,0.01689166,0.0035964847,0.00551195,0.00793294,0.621153],"study_design_scores_gemma":[0.000068124915,0.0023617055,0.8890853,0.0007514713,0.0002697537,0.00032792648,0.005768342,0.045513485,0.00783657,0.006397745,0.041418117,0.00020139155],"about_ca_topic_score_codex":0.004685397,"about_ca_topic_score_gemma":0.009864815,"teacher_disagreement_score":0.009463445,"about_ca_system_score_codex":0.0034660297,"about_ca_system_score_gemma":0.005833597,"threshold_uncertainty_score":0.047421157},"labels":[],"label_agreement":null},{"id":"W2137814112","doi":"10.1061/(asce)1076-0342(2005)11:2(142)","title":"Pulling Loads for Polyethylene Pipes in Horizontal Directional Drilling: Theoretical Modeling and Parametric Study","year":2005,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Borehole; Directional drilling; Stiffness; Drill pipe; Parametric statistics; Trenchless technology; Engineering; Structural engineering; Nominal Pipe Size; Drilling fluid; Geotechnical engineering; Mechanics; Drilling; Materials science; Mechanical engineering; Pipeline transport","score_opus":0.0051907164261265565,"score_gpt":0.21409665315506107,"score_spread":0.2089059367289345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137814112","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91301686,0.00020369561,0.080030404,0.00009647747,0.000009185786,0.000051268224,0.000063827094,0.00011811146,0.0064102765],"genre_scores_gemma":[0.9978619,0.00006929661,0.0016366898,0.0000024044969,0.0000012750521,0.000012115381,0.000008174537,0.0000035908959,0.0004044249],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999818,0.000037322214,0.000007580834,0.000021581169,0.00008594041,0.000029511353],"domain_scores_gemma":[0.99939215,0.0004160396,0.000088998364,0.000033615783,0.000055316552,0.000013850176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036001214,0.00030409914,0.00025573611,0.00034047803,0.00024881773,0.00036740457,0.00042887227,0.0006136684,0.00089370535],"category_scores_gemma":[0.0013577854,0.00035607658,0.00030444228,0.00024022085,0.00062445155,0.00045266567,0.0003299715,0.00020468113,0.00013890634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031499917,0.00012786346,0.0048809904,0.00023547177,0.0000129179025,0.00056680385,0.0006069368,0.88017094,0.0853447,0.0030375044,0.0002296631,0.024471235],"study_design_scores_gemma":[0.000012970224,0.00023038272,0.0021632323,0.000013087792,0.000009720439,0.00010707775,0.00014363117,0.9849163,0.011475042,0.00040073346,0.0005124545,0.000015452575],"about_ca_topic_score_codex":0.0016184611,"about_ca_topic_score_gemma":0.0014175943,"teacher_disagreement_score":0.0016184611,"about_ca_system_score_codex":0.00024640665,"about_ca_system_score_gemma":0.0002892306,"threshold_uncertainty_score":0.0032180548},"labels":[],"label_agreement":null},{"id":"W2150102341","doi":"10.1061/(asce)1076-0342(2001)7:3(123)","title":"Excavation of Surface Installed Pipeline","year":2001,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Ovality; Geotechnical engineering; Slurry; Drilling; Deflection (physics); Water table; Pipeline transport; Trenchless technology; Excavation; Geology; Drilling fluid; Borehole; Nominal Pipe Size; Engineering; Groundwater; Materials science; Structural engineering; Composite material; Mechanical engineering","score_opus":0.004821354324191306,"score_gpt":0.1939167610254665,"score_spread":0.1890954067012752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2150102341","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99578357,0.000025667143,0.0023198873,0.0000117275395,0.0000035436417,0.00006345045,0.00015367643,0.000050881372,0.0015875527],"genre_scores_gemma":[0.98983824,0.000060265655,0.006617256,0.000013121999,0.0000028284448,0.00004135442,0.00041205512,0.000016089985,0.00299875],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99956375,0.000051923285,0.000015744767,0.00012457662,0.00015658942,0.000087398934],"domain_scores_gemma":[0.9990331,0.0002499888,0.0002017136,0.00017967456,0.00022357576,0.00011198715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045217748,0.00032210408,0.0003667575,0.0005910157,0.00070588104,0.0005526951,0.0004262548,0.00036957112,0.002236298],"category_scores_gemma":[0.0018211857,0.0003462518,0.00031297875,0.0006266309,0.0006694372,0.000614974,0.0008702588,0.00046283004,0.00049870013],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023276838,0.0009575538,0.2900591,0.00066341413,0.00005331692,0.0066660037,0.01051856,0.0054494203,0.45898026,0.00071462133,0.0015611415,0.222049],"study_design_scores_gemma":[0.00010588064,0.020383833,0.84172326,0.000052475334,0.00005946149,0.0034973097,0.0066250204,0.008261484,0.10209639,0.00048029536,0.016636193,0.00007837541],"about_ca_topic_score_codex":0.0021269761,"about_ca_topic_score_gemma":0.0062234094,"teacher_disagreement_score":0.002236298,"about_ca_system_score_codex":0.00036354744,"about_ca_system_score_gemma":0.00086327584,"threshold_uncertainty_score":0.0074812174},"labels":[],"label_agreement":null},{"id":"W2153874890","doi":"10.1061/(asce)1076-0342(2007)13:1(1)","title":"Quantifying Effectiveness of Cathodic Protection in Water Mains: Case Studies","year":2007,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Cathodic protection; Mains electricity; Electricity; Environmental science; Forensic engineering; Engineering; Electrical engineering; Voltage; Anode","score_opus":0.019698550832957795,"score_gpt":0.2638252527567854,"score_spread":0.24412670192382763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153874890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9908833,0.00018136927,0.0062094103,0.00007829281,0.000005946449,0.00019183781,0.0001781349,0.000022769214,0.0022489508],"genre_scores_gemma":[0.99431145,0.0001687623,0.0046527716,0.000007700103,0.0000044751323,0.00007610667,0.000087923145,0.000004720096,0.00068604795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99768555,0.0011596669,0.00011740257,0.00024828254,0.00047641998,0.0003126024],"domain_scores_gemma":[0.9833371,0.013236549,0.0011853403,0.00087439234,0.0010906539,0.00027593493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035334912,0.0010523745,0.0007259093,0.0018963126,0.00092653226,0.0010349079,0.0020941822,0.002532,0.0017069003],"category_scores_gemma":[0.009123167,0.0005044201,0.0011795554,0.0024474638,0.0014849296,0.0016273073,0.0011837628,0.0010380355,0.00016595078],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016786322,0.004118672,0.09357183,0.0010546381,0.00046860598,0.004163355,0.0025606365,0.8169802,0.010775635,0.012457327,0.0019452958,0.05022519],"study_design_scores_gemma":[0.0005391559,0.0101110395,0.059012514,0.00018732791,0.00043454184,0.0014192369,0.00813065,0.8469574,0.057268225,0.009511006,0.0061884783,0.00024058128],"about_ca_topic_score_codex":0.012893063,"about_ca_topic_score_gemma":0.018051535,"teacher_disagreement_score":0.012893063,"about_ca_system_score_codex":0.0028334213,"about_ca_system_score_gemma":0.00079257425,"threshold_uncertainty_score":0.025636017},"labels":[],"label_agreement":null},{"id":"W2161415091","doi":"10.1061/(asce)1076-0342(2002)8:1(12)","title":"Methods for Estimating Pipe Pullback Loads for Horizontal Directional Drilling (HDD) Crossings","year":2002,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"","keywords":"Directional drilling; Pullback; Petroleum engineering; Marine engineering; Geology; Engineering; Drilling; Computer science; Mathematical optimization; Mathematics; Mechanical engineering; Geometry","score_opus":0.012055628545071253,"score_gpt":0.2693636514476678,"score_spread":0.2573080229025965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2161415091","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033753373,0.00007908349,0.963976,0.000017048334,0.000008239061,0.000113163725,0.00015123699,0.0011011333,0.0008007727],"genre_scores_gemma":[0.45893952,0.00023855692,0.53879005,0.000013034041,0.0000083318655,0.00047470638,0.00038737126,0.00018483876,0.00096359616],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912316,0.00017051582,0.00005918422,0.00015800048,0.00044647616,0.000042580363],"domain_scores_gemma":[0.9978079,0.0011280874,0.00039982673,0.0001567948,0.0004632395,0.000044281416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001286015,0.0012736449,0.0006145285,0.0020945398,0.0004665353,0.0006811237,0.0011130769,0.0005300839,0.0014482519],"category_scores_gemma":[0.0058001666,0.0008968064,0.0005619555,0.0009377813,0.00033901678,0.00081845437,0.0008206907,0.00044411002,0.0005447587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018123764,0.000094881216,0.025633829,0.00037781475,0.000087257584,0.00012457886,0.00037553243,0.6089251,0.0240631,0.0019742278,0.00055968284,0.3376028],"study_design_scores_gemma":[0.000019801633,0.000100453064,0.009216272,0.000030740146,0.000026774904,0.000120060104,0.00011420761,0.9771837,0.010231766,0.0013893273,0.0015003062,0.00006655417],"about_ca_topic_score_codex":0.0075907465,"about_ca_topic_score_gemma":0.010188361,"teacher_disagreement_score":0.0075907465,"about_ca_system_score_codex":0.0007663833,"about_ca_system_score_gemma":0.0008531371,"threshold_uncertainty_score":0.015093088},"labels":[],"label_agreement":null},{"id":"W2163446657","doi":"10.1061/(asce)1076-0342(2008)14:3(193)","title":"Municipal Infrastructure Asset Levels of Service Assessment for Investment Decisions Using Analytic Hierarchy Process","year":2008,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Analytic hierarchy process; Asset (computer security); Service (business); Transport engineering; Process (computing); Asset management; Work (physics); Level of service; Computer science; Investment (military); Analytic network process; Risk analysis (engineering); Business; Operations research; Engineering; Computer security; Finance","score_opus":0.03318877505226442,"score_gpt":0.3044968029764386,"score_spread":0.2713080279241742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163446657","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07116672,0.0005315034,0.90843207,0.00083663134,0.000040221676,0.0007431724,0.0005496314,0.00041446302,0.017285705],"genre_scores_gemma":[0.6352951,0.0004319742,0.3616545,0.000032706394,0.00002177166,0.00045970522,0.0006300758,0.000038666432,0.0014354982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9957963,0.0023826011,0.00019283606,0.00017225566,0.0011875692,0.00026848036],"domain_scores_gemma":[0.9971942,0.0014161163,0.00038557407,0.00014488913,0.0007166884,0.00014250726],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048433016,0.0005838472,0.0007197322,0.0037708986,0.0011097451,0.0036358868,0.0011046128,0.0005891175,0.004098465],"category_scores_gemma":[0.014818771,0.0004313393,0.0009979607,0.0053622685,0.00054374995,0.001801029,0.0016431395,0.0009962365,0.0004458406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011442614,0.00023158206,0.020192062,0.00064558076,0.00024721763,0.00037713573,0.0022396804,0.44137648,0.0019685226,0.19857484,0.008567596,0.32546484],"study_design_scores_gemma":[0.00002889681,0.00010549912,0.0043888623,0.0001646559,0.00007334403,0.000047588746,0.0012472344,0.91316533,0.00090890407,0.068101026,0.011729377,0.000039282386],"about_ca_topic_score_codex":0.024344195,"about_ca_topic_score_gemma":0.031022036,"teacher_disagreement_score":0.024344195,"about_ca_system_score_codex":0.0051070694,"about_ca_system_score_gemma":0.008778665,"threshold_uncertainty_score":0.04840499},"labels":[],"label_agreement":null},{"id":"W2167254868","doi":"10.1061/(asce)1076-0342(2006)12:1(60)","title":"Simplified Numerical Method to Evaluate the Mechanical Strength of Cast Iron Water Pipes","year":2006,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Geotechnical Engineering and Underground Structures","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada; University of Toronto; Government of Ontario","keywords":"Cast iron; Cracking; Bending; Structural engineering; Water pipe; Beam (structure); Tension (geology); Materials science; Compression (physics); Canalisation; Engineering; Composite material; Mechanical engineering; Piping","score_opus":0.005155066993964272,"score_gpt":0.22868815726593048,"score_spread":0.22353309027196622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167254868","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006036849,0.000159235,0.9819463,0.00008328416,0.000093448085,0.00009408817,0.00014960715,0.000437447,0.010999725],"genre_scores_gemma":[0.31090492,0.00065400504,0.6649968,0.00017100619,0.000118329575,0.0009454493,0.00045216756,0.00030599328,0.021451375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996259,0.00008309021,0.00001717038,0.000033873792,0.00021394403,0.000026033731],"domain_scores_gemma":[0.99934334,0.00022794791,0.00006199798,0.00007286855,0.00026160266,0.000032292723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000527953,0.0005983185,0.0006816059,0.0008121758,0.00039104256,0.00060608983,0.0012816222,0.000977837,0.007027816],"category_scores_gemma":[0.0022975882,0.00030398025,0.00053411466,0.0005097798,0.00046316744,0.0005343003,0.00063113996,0.00068217027,0.0018307405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055039884,0.00006019504,0.0008660315,0.00023596367,0.000023233739,0.00017783705,0.000089250236,0.8947473,0.015170067,0.03143685,0.0038800917,0.05325806],"study_design_scores_gemma":[0.000008884001,0.000010703699,0.00009591108,0.000007572231,0.0000030183944,0.0000260948,0.000005582284,0.9957267,0.0005759246,0.0012443502,0.0022905937,0.0000046523605],"about_ca_topic_score_codex":0.0068468708,"about_ca_topic_score_gemma":0.0052774698,"teacher_disagreement_score":0.007027816,"about_ca_system_score_codex":0.0005596856,"about_ca_system_score_gemma":0.0011533112,"threshold_uncertainty_score":0.023510337},"labels":[],"label_agreement":null},{"id":"W2554860453","doi":"10.1061/(asce)is.1943-555x.0000349","title":"Building Thermal Performance, Extreme Heat, and Climate Change","year":2016,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":115,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Phoenix; Building envelope; Vulnerability (computing); Urban heat island; Extreme weather; Air conditioning; Environmental science; Climate change; Thermal comfort; Meteorology; Architectural engineering; Heat wave; Envelope (radar); Metropolitan area; Building design; Civil engineering; Engineering; Geography; Thermal; Computer science; Geology; Telecommunications; Computer security; Mechanical engineering","score_opus":0.010125967585795523,"score_gpt":0.19084178985266484,"score_spread":0.18071582226686933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2554860453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9899867,0.00044397404,0.0019163553,0.0002004026,0.000016254895,0.000010476439,0.00018201432,0.000021064887,0.007222848],"genre_scores_gemma":[0.99930143,0.00014093415,0.0001937558,0.000009492379,0.0000055227906,0.000003397444,0.00007591025,0.000002257385,0.0002673501],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99973077,0.00012367012,0.0000087558155,0.0000215611,0.000056201017,0.000059063193],"domain_scores_gemma":[0.9995895,0.00015756926,0.000106108106,0.000030521125,0.00005588844,0.00006042111],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004365678,0.00027761218,0.0001622621,0.00034568383,0.00025154892,0.00085849024,0.00015275653,0.00030947337,0.0016905778],"category_scores_gemma":[0.0012486076,0.00010145071,0.00022567008,0.0005822639,0.00036115476,0.00046002975,0.00045850908,0.00024660642,0.00020293877],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002381205,0.00037430596,0.6661812,0.000076268996,0.00020828932,0.0002334104,0.0002861075,0.28529838,0.0019086854,0.0056793834,0.0015173986,0.03799835],"study_design_scores_gemma":[0.0000086058135,0.00034614667,0.8174897,0.000024824165,0.00006952462,0.0001477277,0.0011703783,0.17029743,0.000989804,0.0055970806,0.0038238545,0.000034882378],"about_ca_topic_score_codex":0.008670078,"about_ca_topic_score_gemma":0.013839347,"teacher_disagreement_score":0.008670078,"about_ca_system_score_codex":0.0004921575,"about_ca_system_score_gemma":0.00024746964,"threshold_uncertainty_score":0.017239273},"labels":[],"label_agreement":null},{"id":"W2594077360","doi":"10.1061/(asce)is.1943-555x.0000360","title":"Assessment of Corroded Rock Bolts with Pulse Echo Tests","year":2017,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Concrete Corrosion and Durability","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec; Université de Sherbrooke","funders":"","keywords":"Echo (communications protocol); Engineering; Forensic engineering; Geology; Pulse (music); Geotechnical engineering; Environmental science; Structural engineering; Computer science; Computer security; Electrical engineering","score_opus":0.007360410028469502,"score_gpt":0.2503733591273896,"score_spread":0.24301294909892013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2594077360","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9557467,0.0010017933,0.041125536,0.000027822296,0.00002544566,0.000059431208,0.00014889201,0.00023412186,0.0016303599],"genre_scores_gemma":[0.98199666,0.00059080654,0.015413618,0.000019634703,0.000012657076,0.00002945554,0.000107117274,0.000020729025,0.0018093884],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99938977,0.000060106595,0.000032977623,0.000058956957,0.00041460345,0.00004354022],"domain_scores_gemma":[0.99885213,0.00029221273,0.00022483044,0.00006191168,0.0005017791,0.00006715818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005080131,0.00040825031,0.00023765091,0.0012733659,0.000092523245,0.0003430947,0.00037504922,0.00052415475,0.001417416],"category_scores_gemma":[0.0017873046,0.00018713124,0.00017537076,0.00052394794,0.00026132134,0.0004918789,0.0005477679,0.00035196182,0.0004747753],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001483927,0.000038480724,0.010579719,0.00018152261,0.00001719516,0.00042883365,0.00022687257,0.0006609216,0.9670661,0.00006845136,0.000060712133,0.02052284],"study_design_scores_gemma":[0.000019946643,0.0018026405,0.16527887,0.00005523736,0.00009816379,0.0027729964,0.00080227066,0.01489676,0.81178963,0.00023837006,0.002173113,0.00007203512],"about_ca_topic_score_codex":0.0003453836,"about_ca_topic_score_gemma":0.00061029213,"teacher_disagreement_score":0.001417416,"about_ca_system_score_codex":0.000104803694,"about_ca_system_score_gemma":0.00008969781,"threshold_uncertainty_score":0.004741788},"labels":[],"label_agreement":null},{"id":"W2609860473","doi":"10.1061/(asce)is.1943-555x.0000491","title":"Development of Zonal-Specific Semivariograms for a Strategic RWIS Network Optimization: Case Study","year":2019,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Collaboration in agile enterprises","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo; University of Alberta","funders":"","keywords":"Computer science; Environmental science","score_opus":0.018747322669216037,"score_gpt":0.23988315859994763,"score_spread":0.2211358359307316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2609860473","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6747049,0.00009008576,0.31991354,0.00012766362,0.000010663109,0.00019638671,0.0006032326,0.00033675964,0.004016731],"genre_scores_gemma":[0.8971401,0.000063779786,0.10199625,0.0000069605658,0.0000026586195,0.00008383551,0.00031326045,0.00004050272,0.00035260204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940455,0.00035711098,0.000026198382,0.000074787706,0.00009562109,0.000041729047],"domain_scores_gemma":[0.9984889,0.0010341728,0.00013574409,0.00010356315,0.00021360043,0.000024002427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001936667,0.0005248757,0.0003300347,0.00084903167,0.00024192242,0.0006462276,0.00050473755,0.00029305276,0.00083100225],"category_scores_gemma":[0.004038001,0.000237221,0.0006253312,0.0011625899,0.00027968572,0.00040320432,0.0003993248,0.0005041117,0.00006832911],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003611039,0.000031108266,0.0041908068,0.00003347251,0.000030173716,0.000041333264,0.000061524624,0.98026145,0.0007511406,0.0025019476,0.00017462352,0.0118863005],"study_design_scores_gemma":[0.000006670318,0.00003449667,0.002530581,0.0000037463296,0.0000117201325,0.000011580496,0.00008359717,0.9954764,0.0009112759,0.00053754356,0.00038433546,0.000008034207],"about_ca_topic_score_codex":0.028131183,"about_ca_topic_score_gemma":0.029810514,"teacher_disagreement_score":0.028131183,"about_ca_system_score_codex":0.0010648024,"about_ca_system_score_gemma":0.0011333622,"threshold_uncertainty_score":0.055934906},"labels":[],"label_agreement":null},{"id":"W2768889090","doi":"10.1061/(asce)is.1943-555x.0000399","title":"Energy and Carbon-Emission Analysis of Integrated Green-Roof Photovoltaic Systems: Probabilistic Approach","year":2017,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Photovoltaic system; Environmental science; Renewable energy; Roof; Rooftop photovoltaic power station; Engineering; Automotive engineering; Environmental engineering; Civil engineering; Electrical engineering; Maximum power point tracking; Voltage","score_opus":0.006185900393775928,"score_gpt":0.19731033084142416,"score_spread":0.19112443044764824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768889090","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42808154,0.0011494141,0.5462014,0.00043781553,0.000023610346,0.00014045635,0.00088310614,0.0002442308,0.022838347],"genre_scores_gemma":[0.98963565,0.0002612756,0.0075181415,0.000017116505,0.000010197881,0.000057981037,0.0001737923,0.000025030446,0.0023010143],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994185,0.00021428798,0.000018028935,0.00007603217,0.00016331517,0.00010986181],"domain_scores_gemma":[0.9987895,0.0008779423,0.00012816297,0.00004625943,0.00013192634,0.000026306774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013876448,0.0007212754,0.00071672024,0.0010397804,0.00036736025,0.0010399414,0.0008671915,0.0010024551,0.0029211226],"category_scores_gemma":[0.0021231116,0.00074592984,0.001572608,0.0010556933,0.00061368383,0.0010569899,0.00067844643,0.00055417925,0.00023641877],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013531935,0.000008709612,0.0004778369,0.000010896883,0.00001417687,0.000019107616,0.0000035392422,0.9955978,0.00019905732,0.0024446158,0.000038617593,0.0011721232],"study_design_scores_gemma":[0.0000019477575,0.000012382784,0.00051757984,0.000002236482,0.000009155534,0.000011914325,0.0000057904363,0.9976591,0.000120745746,0.0015721197,0.00008334862,0.0000036778956],"about_ca_topic_score_codex":0.009134679,"about_ca_topic_score_gemma":0.007224575,"teacher_disagreement_score":0.009134679,"about_ca_system_score_codex":0.001389847,"about_ca_system_score_gemma":0.0007815403,"threshold_uncertainty_score":0.018163025},"labels":[],"label_agreement":null},{"id":"W2789668939","doi":"10.1061/(asce)is.1943-555x.0000392","title":"Systemic Seismic Vulnerability of Transportation Networks and Emergency Facilities","year":2017,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Vulnerability assessment; Vulnerability (computing); Transport engineering; Emergency response; Robustness (evolution); Computer science; Engineering; Computer security","score_opus":0.006380712383695073,"score_gpt":0.22675518986081092,"score_spread":0.22037447747711583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2789668939","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9400329,0.00009107356,0.053804442,0.00011596988,0.0000050046724,0.000039646344,0.0002541828,0.00006401839,0.0055927057],"genre_scores_gemma":[0.9987691,0.000036825124,0.0008557821,0.0000031374575,0.0000016310433,0.000010737009,0.000041270236,0.0000029082923,0.0002786412],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995086,0.0001718854,0.000016271246,0.00008103441,0.000121000165,0.00010106945],"domain_scores_gemma":[0.9985965,0.0006260363,0.00041577875,0.000113470676,0.00018262792,0.00006558567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006513151,0.00045649667,0.00027259556,0.001041831,0.00031065816,0.0006895889,0.0004157309,0.00043509624,0.001340831],"category_scores_gemma":[0.0033047777,0.00022999171,0.00036775257,0.0008325787,0.0007974356,0.0011285385,0.001132897,0.00028677587,0.000087054155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006615553,0.000031564574,0.057858665,0.00004969775,0.00010480885,0.0003890389,0.00022609155,0.9159299,0.004252922,0.012020544,0.00033697116,0.0087336805],"study_design_scores_gemma":[0.000005784383,0.00016490759,0.055331964,0.000023684799,0.000067726876,0.00036328574,0.00093884923,0.92350185,0.002787052,0.016030539,0.0007486576,0.00003565839],"about_ca_topic_score_codex":0.0071832864,"about_ca_topic_score_gemma":0.00574826,"teacher_disagreement_score":0.0071832864,"about_ca_system_score_codex":0.0013757345,"about_ca_system_score_gemma":0.0006466053,"threshold_uncertainty_score":0.014282942},"labels":[],"label_agreement":null},{"id":"W2996338922","doi":"10.1061/(asce)is.1943-555x.0000512","title":"Data Analytics in Asset Management: Cost-Effective Prediction of the Pavement Condition Index","year":2019,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":289,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Asset management; Computer science; Predictive modelling; Asset (computer security); Decision tree; Index (typography); Field (mathematics); Data mining; Random forest; Pavement management; Ensemble learning; Machine learning; Engineering; Transport engineering; Mathematics","score_opus":0.00911362593683386,"score_gpt":0.23129552147596152,"score_spread":0.22218189553912765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2996338922","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6818348,0.0051517896,0.29364458,0.0051148115,0.0003039063,0.00033594063,0.0045175194,0.0026503378,0.0064463513],"genre_scores_gemma":[0.94911516,0.0005438938,0.04864037,0.00006591334,0.000045928733,0.00005401827,0.0011516982,0.00002050357,0.00036253963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990759,0.0003208851,0.000087515036,0.00016739764,0.00026920586,0.00007915015],"domain_scores_gemma":[0.996002,0.0023891714,0.00035696678,0.00031840886,0.0007887402,0.00014468776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018911177,0.0009416604,0.00083366473,0.0024420158,0.00029659097,0.0014792511,0.0008818116,0.00085053005,0.0007644832],"category_scores_gemma":[0.007147613,0.00026948864,0.0004885098,0.0028027135,0.0002298665,0.0019853804,0.00062718807,0.0010370648,0.00030739824],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040565318,0.0005524056,0.082567744,0.0002987356,0.00021111958,0.00030184074,0.00014386598,0.5640476,0.0036137307,0.0033537669,0.0068208138,0.3376828],"study_design_scores_gemma":[0.000007678225,0.00006658909,0.0069050277,0.000020060634,0.00002545759,0.000028709865,0.0000762808,0.98734295,0.0016859209,0.0028625333,0.0009655105,0.0000132121495],"about_ca_topic_score_codex":0.009663647,"about_ca_topic_score_gemma":0.0076466915,"teacher_disagreement_score":0.009663647,"about_ca_system_score_codex":0.00089312904,"about_ca_system_score_gemma":0.00094744755,"threshold_uncertainty_score":0.019214809},"labels":[],"label_agreement":null},{"id":"W3117738059","doi":"10.1061/(asce)is.1943-555x.0000596","title":"Life-Cycle Cost Analysis Framework to Support Data Procurement Strategies for Infrastructure Assets","year":2020,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Procurement; Outsourcing; Data collection; Vendor; Cost estimate; Decision support system; Computer science; Agency (philosophy); Operations research; Risk analysis (engineering); Process management; Business; Engineering; Systems engineering; Marketing; Data mining","score_opus":0.050587368334878556,"score_gpt":0.2771934515352377,"score_spread":0.22660608320035916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117738059","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00480583,0.00014436607,0.98345715,0.00039077975,0.000030204435,0.00030521807,0.00048817735,0.00028061727,0.01009769],"genre_scores_gemma":[0.2871137,0.0005396503,0.7038694,0.00017444139,0.000080280275,0.0013527429,0.0013279981,0.00025549592,0.0052862265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99777055,0.0010659572,0.00011738727,0.00021114883,0.0006363944,0.00019868028],"domain_scores_gemma":[0.99337995,0.004702265,0.00042657412,0.0003488541,0.0010013338,0.00014096183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058615333,0.0016266954,0.0010243669,0.0043103453,0.0008799382,0.002921227,0.0024556958,0.0016735347,0.013830642],"category_scores_gemma":[0.013171193,0.0009595032,0.0020493485,0.0026830467,0.00065003696,0.002692956,0.0013682721,0.0024051836,0.001593312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001792187,0.00009525901,0.00076914974,0.0000790296,0.000039027018,0.000080869795,0.000058221947,0.8771607,0.000380265,0.09382122,0.0018783256,0.025619946],"study_design_scores_gemma":[0.0000071729896,0.000024238387,0.0002280401,0.000025131449,0.000012981832,0.00003678661,0.00003807939,0.9637437,0.0002729103,0.030853977,0.0047394545,0.000017615197],"about_ca_topic_score_codex":0.014267682,"about_ca_topic_score_gemma":0.016629273,"teacher_disagreement_score":0.014267682,"about_ca_system_score_codex":0.004355396,"about_ca_system_score_gemma":0.005702078,"threshold_uncertainty_score":0.046268046},"labels":[],"label_agreement":null},{"id":"W3127380385","doi":"10.1061/(asce)is.1943-555x.0000602","title":"Using Machine Learning to Examine Impact of Type of Performance Indicator on Flexible Pavement Deterioration Modeling","year":2021,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":137,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Random forest; Conventional PCI; Computer science; International Roughness Index; Machine learning; Predictive modelling; Artificial intelligence; Algorithm; Regression; Data mining; Statistics; Mathematics; Engineering; Surface finish","score_opus":0.025070782735325224,"score_gpt":0.280486056063361,"score_spread":0.2554152733280358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127380385","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9002987,0.0010144039,0.094748065,0.00044436211,0.0001339296,0.000082831015,0.00047338702,0.0005916356,0.0022125684],"genre_scores_gemma":[0.98649734,0.00015240253,0.0125217615,0.00004241997,0.000023419363,0.000023520244,0.00039066817,0.000020725762,0.00032780133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99884343,0.00044469538,0.00010025795,0.0002879409,0.00019970702,0.00012391675],"domain_scores_gemma":[0.992515,0.005717368,0.00045165277,0.00048722554,0.00066906103,0.00015972544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004584591,0.0011624248,0.0008410824,0.0014450179,0.00037878196,0.0013063324,0.00084179005,0.001060255,0.0010273649],"category_scores_gemma":[0.012019745,0.0002784225,0.0011734042,0.0010087158,0.00048699105,0.0018100974,0.00065054646,0.0014094898,0.0002831001],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023055755,0.0003610324,0.10171243,0.00009674677,0.00033581804,0.00009610967,0.000066174565,0.8270553,0.0013920193,0.00066676503,0.00048064438,0.067506425],"study_design_scores_gemma":[0.000002368851,0.000089089415,0.0065940605,0.00001062925,0.000020478179,0.00001322728,0.000021545764,0.99193937,0.00084234774,0.00033437583,0.00012371423,0.000008721995],"about_ca_topic_score_codex":0.0120246895,"about_ca_topic_score_gemma":0.0074500684,"teacher_disagreement_score":0.0120246895,"about_ca_system_score_codex":0.0007022233,"about_ca_system_score_gemma":0.00082098326,"threshold_uncertainty_score":0.024245977},"labels":[],"label_agreement":null},{"id":"W3166341592","doi":"10.1061/(asce)is.1943-555x.0000620","title":"Accounting for Source Location on the Vulnerability Assessment of Water Distribution Network","year":2021,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Centrality; Ranking (information retrieval); Robustness (evolution); Vulnerability (computing); Metric (unit); Computer science; Network analysis; Graph theory; Graph; Reliability engineering; Data mining; Engineering; Environmental science; Mathematics; Statistics; Theoretical computer science; Machine learning; Computer security; Operations management","score_opus":0.00640424304630699,"score_gpt":0.2192224532327789,"score_spread":0.2128182101864719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3166341592","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8531677,0.00037593866,0.14009549,0.0003067099,0.000031617245,0.00004512247,0.00029471345,0.0001594404,0.005523235],"genre_scores_gemma":[0.9964869,0.0000705705,0.0031050164,0.000004659893,0.0000066789357,0.000005197445,0.00004582066,0.0000054089014,0.0002697626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934477,0.00033800234,0.00002477749,0.00006151905,0.00015325513,0.00007767147],"domain_scores_gemma":[0.99499124,0.003435719,0.00066157355,0.0003196448,0.0004644679,0.00012732102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012228894,0.00061219453,0.0002917481,0.0017385392,0.00031686347,0.0007556785,0.00032791862,0.0004584896,0.0007930793],"category_scores_gemma":[0.006662399,0.00013790044,0.00033098948,0.0012946517,0.00049673003,0.0018403797,0.0009986231,0.00032482302,0.00008016571],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005176246,0.000017034208,0.026168039,0.000040667357,0.0000608603,0.00015424234,0.0000423403,0.94096935,0.0020022052,0.0055553275,0.00020545718,0.024732707],"study_design_scores_gemma":[0.0000018875851,0.00006177627,0.010544498,0.00001238744,0.000030231415,0.00006286099,0.00007410608,0.9830148,0.0012148389,0.0046573025,0.00030909176,0.000016258187],"about_ca_topic_score_codex":0.0068267933,"about_ca_topic_score_gemma":0.009453308,"teacher_disagreement_score":0.0068267933,"about_ca_system_score_codex":0.00071390695,"about_ca_system_score_gemma":0.0005177058,"threshold_uncertainty_score":0.013574123},"labels":[],"label_agreement":null},{"id":"W4283811363","doi":"10.1061/(asce)is.1943-555x.0000706","title":"Erratum for “Network Analytics for Infrastructure Asset Management Systemic Risk Assessment” by Eric Goforth, Wael El-Dakhakhni, and Lydell Wiebe","year":2022,"lang":"en","type":"erratum","venue":"Journal of Infrastructure Systems","topic":"Electricity Theft Detection Techniques","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Nipissing University","funders":"","keywords":"Analytics; Asset management; Asset (computer security); Risk management; Systemic risk; Business; Computer science; Risk analysis (engineering); Data science; Finance; Economics; Computer security","score_opus":0.004132086659864827,"score_gpt":0.23007715033406068,"score_spread":0.22594506367419584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283811363","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002453497,0.0015327544,0.0022974384,0.10291745,0.8577929,0.00011635857,0.002529847,0.0008691362,0.031698793],"genre_scores_gemma":[0.0051730755,0.0064230543,0.0069727614,0.11145412,0.15640002,0.00031760603,0.0050240397,0.0020518873,0.70618343],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99676335,0.00044841788,0.00040907096,0.00026299182,0.0019493502,0.0001667719],"domain_scores_gemma":[0.98119974,0.004718912,0.00072036096,0.0007917928,0.011962803,0.0006063245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002655992,0.0019518158,0.0012978003,0.0042192186,0.0035570913,0.0050786682,0.001801082,0.005994846,0.07654752],"category_scores_gemma":[0.031674873,0.00074918295,0.001035689,0.0022158984,0.0012422014,0.0029397572,0.0015096291,0.0065686726,0.05946427],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006168078,0.000003076743,0.000013874814,0.000015742644,0.0000010546643,0.000021416856,0.000003947506,0.000020141562,0.0000146185985,0.0003466463,0.9974722,0.0020810338],"study_design_scores_gemma":[0.000017598912,0.000017080842,0.00038700938,0.0002131117,0.00000990054,0.000081284015,0.00006542975,0.00028369366,0.00016898605,0.001879771,0.9968554,0.000020745903],"about_ca_topic_score_codex":0.023864718,"about_ca_topic_score_gemma":0.037762824,"teacher_disagreement_score":0.07654752,"about_ca_system_score_codex":0.002611131,"about_ca_system_score_gemma":0.004049758,"threshold_uncertainty_score":0.25607693},"labels":[],"label_agreement":null},{"id":"W4290701547","doi":"10.1061/(asce)is.1943-555x.0000712","title":"Infrastructure Asset Management System Optimized Configuration: A Genetic Algorithm–Complex Network Theoretic Metamanagement Approach","year":2022,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University; Nipissing University","funders":"","keywords":"Component (thermodynamics); Asset (computer security); Computer science; Risk analysis (engineering); Restructuring; Information system; Asset management; Resilience (materials science); Social connectedness; Engineering; Computer security; Business","score_opus":0.0053095406698663635,"score_gpt":0.19323276249208593,"score_spread":0.18792322182221957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4290701547","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04900101,0.0006133169,0.9353675,0.00088746066,0.000064675616,0.0001244027,0.000100072255,0.0004301857,0.0134114055],"genre_scores_gemma":[0.71833825,0.000353301,0.27462518,0.0003487541,0.00004379031,0.00027619378,0.00022191607,0.000098156335,0.005694487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976915,0.000087356304,0.000008212993,0.00004995754,0.00004639029,0.00003894079],"domain_scores_gemma":[0.99953914,0.00028031104,0.000046763973,0.000022287633,0.00008398423,0.000027589194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063859107,0.0007503415,0.0007630163,0.00081376586,0.00042259248,0.001105968,0.001136105,0.0013907254,0.0028317485],"category_scores_gemma":[0.0016386884,0.00043621278,0.0006035449,0.0006460031,0.00065056595,0.00073024136,0.0010689939,0.0009909765,0.0002915126],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013979041,0.000018000614,0.0003575024,0.00001586128,0.000013853638,0.000035538713,0.000020814572,0.98405576,0.0002573498,0.0036124527,0.00039148625,0.011207433],"study_design_scores_gemma":[0.0000039552024,0.000008419389,0.000043460346,0.0000031861787,0.0000035191383,0.000005263551,0.000007798449,0.99824727,0.00004437208,0.0014320826,0.00019901003,0.0000017138401],"about_ca_topic_score_codex":0.009237737,"about_ca_topic_score_gemma":0.007002814,"teacher_disagreement_score":0.009237737,"about_ca_system_score_codex":0.00097433245,"about_ca_system_score_gemma":0.0013911057,"threshold_uncertainty_score":0.018367946},"labels":[],"label_agreement":null},{"id":"W4323636885","doi":"10.1061/jitse4.iseng-2188","title":"Dynamic Resilience Quantification of Hydropower Infrastructure in Multihazard Environments","year":2023,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Flood Risk Assessment and Management","field":"Environmental Science","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Hydropower; Resilience (materials science); Risk analysis (engineering); Interdependence; Hazard; Critical infrastructure; Decision support system; Computer science; Engineering; Environmental resource management; Environmental science; Business; Computer security","score_opus":0.00458022081842644,"score_gpt":0.24614960076454384,"score_spread":0.2415693799461174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323636885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6079042,0.00024458056,0.3824005,0.00019308027,0.000028009508,0.00007114619,0.00036150936,0.00030392947,0.008493009],"genre_scores_gemma":[0.9945116,0.00008479875,0.0046334197,0.0000076006104,0.0000026227358,0.000023660676,0.000054224223,0.00001008604,0.0006719725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998839,0.00002525538,0.000004952094,0.000030855925,0.000023190583,0.000031751955],"domain_scores_gemma":[0.9997892,0.00009116457,0.00005170332,0.000020000336,0.000026818161,0.000021105416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023027518,0.00054217153,0.00029651404,0.0005673446,0.0002854635,0.00062451937,0.0005059017,0.0006083055,0.00088685384],"category_scores_gemma":[0.00074217253,0.00024178544,0.00051237165,0.0003218901,0.00063972955,0.0009248723,0.0009412151,0.0004156142,0.00007794235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009274471,0.000008245213,0.00092055416,0.000009052486,0.000007446933,0.00005269692,0.000019478644,0.9937735,0.0017387796,0.0018262259,0.000053184634,0.0015815924],"study_design_scores_gemma":[9.663827e-7,0.000010498227,0.00048926956,0.0000027938072,0.000004093309,0.000010079922,0.000018730272,0.9981876,0.00042024237,0.00075781974,0.000093860945,0.0000040290724],"about_ca_topic_score_codex":0.0074624578,"about_ca_topic_score_gemma":0.0040990356,"teacher_disagreement_score":0.0074624578,"about_ca_system_score_codex":0.0007630286,"about_ca_system_score_gemma":0.0006338415,"threshold_uncertainty_score":0.0148380995},"labels":[],"label_agreement":null},{"id":"W4388439123","doi":"10.1061/jitse4.iseng-2291","title":"Empirical Risk Analysis Methodology for Adversarial Threats against Critical Infrastructure","year":2023,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Merck Canada Inc. (Canada)","funders":"Sandia National Laboratories","keywords":"Critical infrastructure; Adversarial system; Risk analysis (engineering); Computer science; Engineering; Environmental planning; Business; Operations research; Environmental resource management; Computer security; Economics; Geography","score_opus":0.032644893103412106,"score_gpt":0.3422002247057873,"score_spread":0.3095553316023752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388439123","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005793648,0.00038942829,0.9892146,0.00027638336,0.000041318155,0.00013573101,0.00008487934,0.000100993384,0.0039629415],"genre_scores_gemma":[0.56852037,0.0028245044,0.41476318,0.00036921096,0.00039036412,0.0019034728,0.00071696215,0.00021508647,0.010296953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9947246,0.0025896477,0.00026925723,0.000637696,0.001514739,0.0002640579],"domain_scores_gemma":[0.9774739,0.01735526,0.0020011244,0.0011494658,0.001807962,0.00021215563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012996515,0.0016053887,0.001047445,0.004338792,0.00074236817,0.0025064263,0.0020406467,0.0013391064,0.005540004],"category_scores_gemma":[0.031564746,0.00058333715,0.001324331,0.0018954969,0.002316846,0.0035675908,0.0021520967,0.0030336443,0.0009321274],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039038954,0.00011062845,0.004511893,0.00023651285,0.00015264512,0.00016350385,0.00026174693,0.553063,0.0010401466,0.3686276,0.0028623557,0.06893098],"study_design_scores_gemma":[0.0000058863006,0.00009174704,0.0010248806,0.000084847365,0.000022259454,0.00011661296,0.00016990758,0.8827007,0.0004397562,0.11151289,0.003804445,0.000026200494],"about_ca_topic_score_codex":0.0023585216,"about_ca_topic_score_gemma":0.0014188449,"teacher_disagreement_score":0.012996515,"about_ca_system_score_codex":0.0025068186,"about_ca_system_score_gemma":0.0021687567,"threshold_uncertainty_score":0.06873292},"labels":[],"label_agreement":null},{"id":"W4400014247","doi":"10.1061/jitse4.iseng-2251","title":"Selection and Evaluation of Integrated Solutions in a Combined Sewer Network","year":2024,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Urban Stormwater Management Solutions","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval; Institut National de la Recherche Scientifique","funders":"","keywords":"Selection (genetic algorithm); Sanitary sewer; Operations research; Engineering; Computer science; Civil engineering; Environmental engineering; Artificial intelligence","score_opus":0.012826848349752108,"score_gpt":0.23859561147769734,"score_spread":0.22576876312794522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400014247","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.565146,0.0002881847,0.42420435,0.00013865653,0.000026937432,0.00086102047,0.0002495281,0.00033487572,0.008750418],"genre_scores_gemma":[0.906449,0.000106161024,0.09212016,0.000018652401,0.0000054858097,0.00032091944,0.00012581148,0.00001921068,0.00083452126],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99902725,0.00033217928,0.000044606022,0.0001519585,0.00029741362,0.00014659029],"domain_scores_gemma":[0.99880254,0.00053356704,0.0002104386,0.00005791263,0.00032480605,0.00007075521],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019103677,0.0011179385,0.00089330814,0.0020615768,0.00035959794,0.0014035499,0.00082304527,0.0009153089,0.002116267],"category_scores_gemma":[0.0039158836,0.00037268936,0.00060485234,0.00082022586,0.00045951217,0.00086331414,0.0011104087,0.00037642373,0.00011034086],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010722367,0.00017214844,0.003138299,0.00008892987,0.000097571574,0.000059861253,0.000037005855,0.9505401,0.0032397541,0.0018757493,0.00016276614,0.040480588],"study_design_scores_gemma":[0.000036625082,0.00048213752,0.0013560429,0.0000186166,0.00006256824,0.000012631629,0.00008905257,0.9937955,0.002735172,0.00097281765,0.0004296374,0.000009224319],"about_ca_topic_score_codex":0.004312671,"about_ca_topic_score_gemma":0.005791597,"teacher_disagreement_score":0.004312671,"about_ca_system_score_codex":0.0012917977,"about_ca_system_score_gemma":0.0016377433,"threshold_uncertainty_score":0.010103166},"labels":[],"label_agreement":null},{"id":"W4402949150","doi":"10.1061/jitse4.iseng-2489","title":"Multiyear Maintenance and Rehabilitation Optimization for Large-Scale Infrastructure Networks: An Enhanced Genetic Algorithm Approach","year":2024,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Genetic algorithm; Scale (ratio); Computer science; Rehabilitation; Optimization algorithm; Operations research; Mathematical optimization; Distributed computing; Engineering; Machine learning; Mathematics; Geography; Biology","score_opus":0.0025979705711306933,"score_gpt":0.2085724626642084,"score_spread":0.2059744920930777,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402949150","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07381742,0.00031537536,0.9198505,0.00033059707,0.000035846057,0.00007538723,0.000038732775,0.00028899705,0.005247166],"genre_scores_gemma":[0.67876726,0.00027768684,0.3174744,0.00010423809,0.0000310445,0.00013874925,0.00006798257,0.00005578532,0.0030828745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998124,0.00006520841,0.000006447062,0.00003520358,0.00005060842,0.000030113742],"domain_scores_gemma":[0.9996923,0.00017648147,0.000037714835,0.000018975083,0.00005367157,0.00002090965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000626556,0.000488086,0.00053109945,0.0007021995,0.00030429603,0.0005894776,0.00093517103,0.001088863,0.0011285675],"category_scores_gemma":[0.0010774635,0.00027212087,0.0005518534,0.00059581123,0.00039415134,0.00063352985,0.0005040901,0.00066890026,0.00010594891],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006175703,0.000014839699,0.0002412373,0.000006714207,0.000008500303,0.000017640488,0.00001059674,0.98916686,0.0004524481,0.0016286896,0.000092204165,0.008353977],"study_design_scores_gemma":[0.0000024222593,0.000009933089,0.000050304254,0.0000014411002,0.0000024903636,0.000005006961,0.0000037484674,0.9991726,0.000094083676,0.00047658462,0.0001800144,0.0000013465043],"about_ca_topic_score_codex":0.006820033,"about_ca_topic_score_gemma":0.0074191103,"teacher_disagreement_score":0.006820033,"about_ca_system_score_codex":0.0007634734,"about_ca_system_score_gemma":0.0011932009,"threshold_uncertainty_score":0.013560653},"labels":[],"label_agreement":null},{"id":"W4405037217","doi":"10.1061/jitse4.iseng-2512","title":"Simulation-Based Evaluation of Resilience-Enhancing Measures for Transportation Systems Subject to Hydrometeorological Hazard Events","year":2024,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Hydrometeorology; Resilience (materials science); Hazard; Subject (documents); Hazard analysis; Computer science; Engineering; Risk analysis (engineering); Environmental resource management; Environmental science; Reliability engineering; Business; Geography; Meteorology","score_opus":0.015368313100232954,"score_gpt":0.29969876883739005,"score_spread":0.2843304557371571,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405037217","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84914446,0.00033715367,0.13791339,0.00033254063,0.0000608683,0.00042484715,0.0005533168,0.00034971547,0.010883662],"genre_scores_gemma":[0.9918107,0.000078578705,0.0076597445,0.0000089724235,0.000004054147,0.00008941711,0.00008643369,0.0000073108536,0.00025479248],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999003,0.00066595647,0.00004390235,0.00006519484,0.00011621593,0.00010567786],"domain_scores_gemma":[0.99675673,0.0023531758,0.00027924994,0.00016615468,0.0002993304,0.00014533625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019746395,0.0008545353,0.00075289747,0.0010192047,0.00035603534,0.0008927726,0.0007117545,0.0009716168,0.0011206121],"category_scores_gemma":[0.0047723134,0.00033931958,0.00080317655,0.0005614402,0.0006141081,0.0006689745,0.0009228899,0.0006192901,0.000085538464],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041748743,0.000024483952,0.0007310559,0.000010555323,0.000015524969,0.000012671473,0.000010940788,0.99754936,0.00022507447,0.00051861757,0.000019993531,0.0008399172],"study_design_scores_gemma":[0.000009117697,0.00006719715,0.00040054525,0.0000051311113,0.000010815511,0.0000042184115,0.000020323592,0.9987268,0.00032586264,0.000336986,0.000088160676,0.00000482434],"about_ca_topic_score_codex":0.012754724,"about_ca_topic_score_gemma":0.007852995,"teacher_disagreement_score":0.012754724,"about_ca_system_score_codex":0.0018215766,"about_ca_system_score_gemma":0.0014346548,"threshold_uncertainty_score":0.025361001},"labels":[],"label_agreement":null},{"id":"W4405759644","doi":"10.1061/jitse4.iseng-2690","title":"<i>Journal of Infrastructure Systems</i> : Thirty Years and an Opportunity to Refocus","year":2024,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Environmental planning; Engineering; Business; Computer science; Operations research; Management science; Geography","score_opus":0.006476028008768488,"score_gpt":0.24291262955785997,"score_spread":0.2364366015490915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405759644","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012097744,0.06065056,0.0013410125,0.6302433,0.27905232,0.00002794586,0.00027471557,0.00013111465,0.0270692],"genre_scores_gemma":[0.076770246,0.112270065,0.009987905,0.3923942,0.31939068,0.000118010204,0.0008242897,0.0004928757,0.08775171],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99520314,0.00092301064,0.00036591486,0.0002499765,0.0023996804,0.00085835234],"domain_scores_gemma":[0.9695719,0.0065150326,0.0017277241,0.001830636,0.011089104,0.009265722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009558537,0.0010243986,0.00091478927,0.0038046027,0.0046128593,0.01802138,0.0017297957,0.008461171,0.02714317],"category_scores_gemma":[0.02213417,0.00039553765,0.0009123702,0.0031909144,0.008560277,0.013391539,0.006873341,0.00957567,0.008784464],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020268515,0.000026094727,0.0003160243,0.00018607358,0.00001221725,0.000063327665,0.00015309514,0.00007616356,0.00021295265,0.037987866,0.93442416,0.026521815],"study_design_scores_gemma":[0.0000064572077,0.00002847891,0.0010112922,0.00046753426,0.000008203381,0.000099363824,0.00083318906,0.00011528043,0.00009242932,0.020734845,0.9765743,0.000028621884],"about_ca_topic_score_codex":0.00487452,"about_ca_topic_score_gemma":0.016198311,"teacher_disagreement_score":0.02714317,"about_ca_system_score_codex":0.0035904108,"about_ca_system_score_gemma":0.015350249,"threshold_uncertainty_score":0.09080297},"labels":[],"label_agreement":null},{"id":"W4411960407","doi":"10.1061/jitse4.iseng-2646","title":"Beyond the Pipes: Performance Management of Water Supply Systems under Uncertainty","year":2025,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Water Systems and Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Windsor","funders":"","keywords":"Environmental science; Water supply; Engineering; Environmental resource management; Business; Natural resource economics; Computer science; Risk analysis (engineering); Environmental engineering; Economics","score_opus":0.002857251735146443,"score_gpt":0.18040673594363857,"score_spread":0.17754948420849212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411960407","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3435846,0.00068496406,0.6419488,0.0010162558,0.000033524724,0.00019400837,0.00039122018,0.00014841172,0.011998226],"genre_scores_gemma":[0.9881656,0.00018334137,0.01107695,0.000017364731,0.000011577104,0.000035472185,0.000071799645,0.00001283663,0.00042501884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973902,0.001130378,0.00010365886,0.000311036,0.0007621089,0.00030253612],"domain_scores_gemma":[0.99568117,0.002922492,0.00054045796,0.00012308123,0.00063297787,0.000099827375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047386736,0.0009803043,0.00078787387,0.0016805737,0.00067185133,0.0029898325,0.00088847434,0.0009190167,0.0008604624],"category_scores_gemma":[0.012684611,0.0003870355,0.0005803843,0.0017887156,0.0013140023,0.0031607524,0.001238113,0.0009013278,0.0000619566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043427957,0.00002252888,0.0030931192,0.000054007087,0.0000483381,0.00007953304,0.00016255608,0.9672404,0.00065143744,0.014827756,0.00019052421,0.013586318],"study_design_scores_gemma":[0.0000031532163,0.000058740105,0.0030231008,0.000022642096,0.000014403726,0.000020162952,0.00022448257,0.9783342,0.0005973314,0.017255032,0.00042366874,0.000023061515],"about_ca_topic_score_codex":0.02074473,"about_ca_topic_score_gemma":0.010095117,"teacher_disagreement_score":0.02074473,"about_ca_system_score_codex":0.003313454,"about_ca_system_score_gemma":0.0022558342,"threshold_uncertainty_score":0.041247964},"labels":[],"label_agreement":null},{"id":"W4414894778","doi":"10.1061/jitse4.iseng-2697","title":"Enhancing Road Asset Management with CityGML Enriched by Public Inputs: A Comprehensive Approach to Pothole Repair Prioritization","year":2025,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"3D Modeling in Geospatial Applications","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pothole (geology); Asset (computer security); Asset management; Decision support system; Sociotechnical system; Building information modeling; Artificial neural network","score_opus":0.005100105958492613,"score_gpt":0.2111437960935638,"score_spread":0.20604369013507118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414894778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.300135,0.00057835685,0.6581945,0.0035525872,0.00007066454,0.0006530812,0.010530082,0.010530572,0.01575516],"genre_scores_gemma":[0.77630144,0.00021475677,0.21716951,0.00009236292,0.000013743102,0.00015421641,0.004501686,0.00014890343,0.0014032663],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988232,0.0004888985,0.00007310187,0.00025132016,0.00025971542,0.000103707745],"domain_scores_gemma":[0.9966223,0.0014557993,0.00048217428,0.0006350928,0.000666062,0.00013866779],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021575564,0.00078235177,0.0004931895,0.0027001244,0.000560388,0.002252684,0.0011462932,0.0007091955,0.0018109822],"category_scores_gemma":[0.006913807,0.00044183838,0.0005819583,0.003243792,0.00073385815,0.0030105638,0.0019915502,0.0008802032,0.000464755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014777372,0.00032409455,0.051550057,0.00052130374,0.00013853541,0.00043897587,0.0020323335,0.66989833,0.0052749147,0.014189297,0.006660553,0.24882376],"study_design_scores_gemma":[0.000013755222,0.00006416903,0.010606006,0.00009180015,0.000036194626,0.000050326515,0.0014489827,0.9625962,0.0036255866,0.007432565,0.013982675,0.000051773088],"about_ca_topic_score_codex":0.064188845,"about_ca_topic_score_gemma":0.14605284,"teacher_disagreement_score":0.064188845,"about_ca_system_score_codex":0.003154744,"about_ca_system_score_gemma":0.004220505,"threshold_uncertainty_score":0.12763041},"labels":[],"label_agreement":null},{"id":"W4415010438","doi":"10.1061/jitse4.iseng-2717","title":"Assessment of the Impacts of Climatic Factors and Infrastructure Characteristics on Gas Pipeline Failures","year":2025,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Structural Integrity and Reliability Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Pipeline (software); Pipeline transport; Reliability (semiconductor); Akaike information criterion; Negative binomial distribution; Natural gas; Resource (disambiguation); Land use","score_opus":0.004339508206175575,"score_gpt":0.2406333735360903,"score_spread":0.23629386532991473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415010438","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9977392,0.00006555068,0.0015303488,0.000026966547,0.0000026277016,0.0000088610295,0.00020415073,0.000010498315,0.00041182883],"genre_scores_gemma":[0.99950695,0.00004582023,0.00023144808,0.0000024386457,0.0000023755165,0.000003116447,0.00014511676,0.0000022939828,0.000060552076],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993123,0.00025262192,0.00003890919,0.00011683743,0.00015694692,0.0001224301],"domain_scores_gemma":[0.9940612,0.0034251027,0.0014394033,0.0002365701,0.00060941075,0.00022829488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001493842,0.0004251285,0.0003149558,0.0010234553,0.00024428288,0.00056140893,0.00031306528,0.00031305515,0.0008320997],"category_scores_gemma":[0.005895298,0.00022935489,0.0006645667,0.0010883217,0.0003603644,0.00075359124,0.0005229234,0.0004111769,0.00011129858],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012661026,0.00007086152,0.936488,0.00002374349,0.00013471721,0.0001979048,0.000087851135,0.052762236,0.0015959679,0.00027825893,0.00011378446,0.008120039],"study_design_scores_gemma":[0.0000027258386,0.00015022146,0.92298454,0.0000059967792,0.0000552636,0.00007904633,0.00033261123,0.07536125,0.0006051616,0.00019981459,0.00020899232,0.00001441747],"about_ca_topic_score_codex":0.014671973,"about_ca_topic_score_gemma":0.0186165,"teacher_disagreement_score":0.014671973,"about_ca_system_score_codex":0.00060470967,"about_ca_system_score_gemma":0.00065566326,"threshold_uncertainty_score":0.029173136},"labels":[],"label_agreement":null},{"id":"W4415994804","doi":"10.1061/jitse4.iseng-2754","title":"Probabilistic Modeling to Develop the Optimal Seismic Resilience Enhancement Strategy for Industrial Facilities","year":2025,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Probabilistic logic; Interdependence; Component (thermodynamics); Resilience (materials science); Oil refinery; Downstream (manufacturing); Critical infrastructure; Investment (military)","score_opus":0.018996018399040904,"score_gpt":0.2581334774623677,"score_spread":0.23913745906332678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415994804","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061322637,0.00034186596,0.92282706,0.0004864108,0.0000361529,0.00012930068,0.0003100754,0.00018992889,0.014356521],"genre_scores_gemma":[0.9401296,0.0005608768,0.054691434,0.000058550646,0.000031165484,0.00023394854,0.00018752474,0.00005718712,0.004049766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995933,0.00015905108,0.000013839825,0.000049236874,0.00009591015,0.00008863821],"domain_scores_gemma":[0.9992199,0.00046733013,0.00013152456,0.000023597951,0.00011554895,0.000042158987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010668824,0.0010023663,0.00097383367,0.0011670575,0.0004260476,0.00095977297,0.0013004849,0.0010417209,0.003846987],"category_scores_gemma":[0.0022202304,0.0007917846,0.0010117148,0.0009847085,0.00060125144,0.0011210211,0.0008881937,0.0008578562,0.0002668198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003139738,0.0000037043312,0.00010625239,0.0000044932744,0.000004158152,0.00000805421,0.0000028258141,0.9962214,0.000059568498,0.0028197882,0.000053488544,0.00071299117],"study_design_scores_gemma":[0.0000019152358,0.0000066625794,0.000065637134,0.0000022334475,0.0000038081319,0.0000043103537,0.000006350485,0.9980286,0.000035219713,0.0017071615,0.00013582275,0.0000022884192],"about_ca_topic_score_codex":0.015803372,"about_ca_topic_score_gemma":0.01459461,"teacher_disagreement_score":0.015803372,"about_ca_system_score_codex":0.0019362137,"about_ca_system_score_gemma":0.0026034156,"threshold_uncertainty_score":0.031422734},"labels":[],"label_agreement":null},{"id":"W7116876001","doi":"10.1061/jitse4.iseng-2757","title":"Digitalizing Bridge Management: Current Trends, Challenges, and a Practical Implementation Framework","year":2025,"lang":"en","type":"article","venue":"Journal of Infrastructure Systems","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Bridge (graph theory); Prosperity; Emerging technologies; Transformative learning; Management system; Manger","score_opus":0.013966493168588083,"score_gpt":0.30997777011171623,"score_spread":0.2960112769431282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7116876001","genre_codex":"commentary","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045865636,0.11195635,0.14638029,0.52435684,0.0017328816,0.0009813493,0.00026013126,0.0006769273,0.16778964],"genre_scores_gemma":[0.59293634,0.14802718,0.2245894,0.020281706,0.0010339961,0.0012234572,0.0004938012,0.00013463947,0.011279499],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99042666,0.0040307054,0.00087380287,0.0008874215,0.0027030932,0.0010783246],"domain_scores_gemma":[0.9804998,0.010829682,0.0011928697,0.0010675819,0.004495862,0.001914234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026402872,0.00091618055,0.00052985584,0.0033722187,0.0026415323,0.0164622,0.004879403,0.007909286,0.008202172],"category_scores_gemma":[0.020274969,0.00055837457,0.00076431676,0.0039444943,0.009737801,0.024729986,0.008402311,0.007654823,0.0012091998],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004180591,0.0004875748,0.0033024363,0.0030789312,0.000017979588,0.00018764511,0.0034859462,0.0024564406,0.0010946152,0.54783565,0.011730987,0.42628002],"study_design_scores_gemma":[0.00009585281,0.00094024814,0.006916218,0.018183252,0.00008184836,0.0007653894,0.05397875,0.017747983,0.0040141954,0.38545507,0.511636,0.00018518168],"about_ca_topic_score_codex":0.0055367555,"about_ca_topic_score_gemma":0.006104024,"teacher_disagreement_score":0.026402872,"about_ca_system_score_codex":0.007992991,"about_ca_system_score_gemma":0.019866772,"threshold_uncertainty_score":0.13963342},"labels":[],"label_agreement":null}]}