{"meta":{"query_hash":"5272a675250b","filters":{"venue":"Journal of Management in Engineering"},"cohort_total":29,"direct_labels_cover":0,"predictions_cover":29,"exported":29,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/5272a675250b","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Management+in+Engineering"},"results":[{"id":"W1965464526","doi":"10.1061/(asce)me.1943-5479.0000107","title":"Construction Business Cycle Analysis Using the Regime Switching Model","year":2011,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Insurance and Financial Risk Management","field":"Economics, Econometrics and Finance","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business cycle; Recession; Business; Quarter (Canadian coin); Financial crisis; Gross domestic product; Construction industry; Economics; Economic indicator; Macroeconomics; Engineering","score_opus":0.02786008300837129,"score_gpt":0.19917458183653325,"score_spread":0.17131449882816197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965464526","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39171946,0.0008899929,0.5942971,0.0010220157,0.00010888948,0.0001664674,0.0009761437,0.0005431633,0.010276809],"genre_scores_gemma":[0.9866317,0.0004184457,0.009033959,0.00004436828,0.000038458304,0.00009459394,0.00056523504,0.000026350059,0.0031468815],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999491,0.0002203369,0.00002349462,0.00008617562,0.00007331857,0.000105767096],"domain_scores_gemma":[0.99814534,0.0014045469,0.000187841,0.00006862173,0.00012723697,0.00006642742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016608047,0.0004573024,0.00090500625,0.0011641424,0.00038013977,0.0010250688,0.0007513565,0.00085433177,0.0045985407],"category_scores_gemma":[0.004758701,0.00030599852,0.0012624923,0.000986924,0.0004113239,0.00069230876,0.0006159848,0.0011992622,0.00038422816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009972871,0.00007228462,0.010321966,0.00005669066,0.00015051392,0.00017989043,0.00011371414,0.9431723,0.00059853547,0.029857952,0.0013022219,0.014074227],"study_design_scores_gemma":[0.000004526471,0.0000087954795,0.0008516863,0.000003197348,0.000008545293,0.000008402171,0.000011215621,0.99523723,0.000036304493,0.0036051648,0.00021953645,0.0000053586264],"about_ca_topic_score_codex":0.016179614,"about_ca_topic_score_gemma":0.0072769905,"teacher_disagreement_score":0.016179614,"about_ca_system_score_codex":0.0008419545,"about_ca_system_score_gemma":0.0007905421,"threshold_uncertainty_score":0.03217089},"labels":[],"label_agreement":null},{"id":"W1969988169","doi":"10.1061/(asce)me.1943-5479.0000338","title":"Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; Golder Associates (Canada)","funders":"","keywords":"Solver; Computer science; Mathematical optimization; Metaheuristic; Scheduling (production processes); Job shop scheduling; Constraint programming; Software; Heuristics; Project management; Heuristic; Industrial engineering; Operations research; Systems engineering; Algorithm; Stochastic programming; Schedule; Mathematics; Engineering; Programming language","score_opus":0.07902712514998302,"score_gpt":0.3579501755480102,"score_spread":0.2789230503980272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969988169","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03167357,0.000301364,0.9618064,0.00023175208,0.000040202023,0.00015128305,0.00008905498,0.00025560087,0.005450765],"genre_scores_gemma":[0.40212736,0.0004120792,0.5938654,0.00007699941,0.000025908399,0.00026436787,0.0001895623,0.00012925966,0.0029090398],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984326,0.0008127698,0.00005937717,0.0002262469,0.00027200373,0.000197035],"domain_scores_gemma":[0.9978388,0.0013202425,0.00027915902,0.0001718393,0.00021278615,0.00017711916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022601858,0.0007078474,0.0008570746,0.000919427,0.00081003446,0.0013844451,0.0011257447,0.0009466814,0.0046627917],"category_scores_gemma":[0.005341401,0.0004987771,0.00071415055,0.0016637706,0.0004970481,0.0015891758,0.00119115,0.001172751,0.0004538651],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009291121,0.00007709723,0.0006226251,0.00017430674,0.00002829689,0.00008352488,0.00006488066,0.8969421,0.002971808,0.016700272,0.0012645151,0.08097765],"study_design_scores_gemma":[0.000018574277,0.00010317384,0.00027425503,0.00002011638,0.000008623872,0.000041825413,0.000053981774,0.98371017,0.0017832812,0.010341766,0.0036316486,0.000012562148],"about_ca_topic_score_codex":0.0061447835,"about_ca_topic_score_gemma":0.009535105,"teacher_disagreement_score":0.0061447835,"about_ca_system_score_codex":0.0014777594,"about_ca_system_score_gemma":0.002443238,"threshold_uncertainty_score":0.015598536},"labels":[],"label_agreement":null},{"id":"W2013987637","doi":"10.1061/(asce)me.1943-5479.0000190","title":"Discussion of “Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling” by Hong Zhang","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Zhàng; Ant colony optimization algorithms; Scheduling (production processes); ANT; Operations research; Computer science; Mathematical optimization; Engineering; Artificial intelligence; Operations management; Geography; Mathematics; Computer network; China","score_opus":0.035036045946857775,"score_gpt":0.3236500471661229,"score_spread":0.2886140012192651,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013987637","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015650412,0.06582284,0.11552508,0.67469764,0.030284503,0.00021464325,0.00018263556,0.00017525506,0.097447],"genre_scores_gemma":[0.41653258,0.097559154,0.065811925,0.2033522,0.026421014,0.0005217002,0.00024281912,0.00028051547,0.18927804],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99798536,0.0010050929,0.000103459206,0.00024068801,0.0005750511,0.00009022229],"domain_scores_gemma":[0.99781203,0.0011740228,0.00010016903,0.0000781091,0.0007473205,0.000088282184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042275125,0.00041421974,0.00034051455,0.0006923493,0.00094836287,0.0020200855,0.0013546847,0.0023661498,0.0029024389],"category_scores_gemma":[0.0062901466,0.00022676018,0.0007448447,0.0015969153,0.0011950094,0.0027005263,0.0010447328,0.0025921515,0.00063978264],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015577307,0.00010975411,0.0017549483,0.0008287757,0.000114463575,0.0014274536,0.0024616143,0.02517008,0.001376018,0.47242135,0.36404693,0.13013282],"study_design_scores_gemma":[0.00005116681,0.00010174193,0.0012707819,0.0004603463,0.00003583125,0.00038236697,0.00152776,0.021016981,0.0019580931,0.08434719,0.8887845,0.000063292646],"about_ca_topic_score_codex":0.0057930383,"about_ca_topic_score_gemma":0.003185235,"teacher_disagreement_score":0.0057930383,"about_ca_system_score_codex":0.0018641026,"about_ca_system_score_gemma":0.0014280077,"threshold_uncertainty_score":0.022357523},"labels":[],"label_agreement":null},{"id":"W2022168955","doi":"10.1061/(asce)me.1943-5479.0000279","title":"Review of Contemporary Construction Procurement Practices","year":2013,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Public Procurement and Policy","field":"Business, Management and Accounting","cited_by":130,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College","funders":"","keywords":"Procurement; Process management; Request for proposal; Standardization; Construction industry; Process (computing); Business; Construction management; Chief procurement officer; Engineering management; Knowledge management; Engineering; Construction engineering; Computer science; Marketing; Civil engineering","score_opus":0.02786410010238504,"score_gpt":0.2527995101850429,"score_spread":0.22493541008265783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022168955","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002194403,0.98878586,0.0008274352,0.0011862731,0.00019267978,0.000017398661,0.0001927316,0.000019223036,0.0065839724],"genre_scores_gemma":[0.0071442295,0.9909025,0.000775548,0.00025427042,0.00012624687,0.000015097032,0.00018762803,0.0000071076374,0.00058732874],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99669814,0.0009048399,0.00066393416,0.0002976822,0.0012747481,0.00016064695],"domain_scores_gemma":[0.9910132,0.0056731114,0.0009821791,0.0002028534,0.001998183,0.0001304319],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034816107,0.0006184743,0.0010219621,0.012614849,0.00077214226,0.0023399699,0.0013395636,0.0008869151,0.0049631023],"category_scores_gemma":[0.006897345,0.0004555065,0.0007035221,0.025121784,0.0011392615,0.0025860032,0.00092429045,0.0007672153,0.0012556417],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007756208,0.000043089676,0.0022396413,0.058494322,0.0001375628,0.00053000473,0.0026880754,0.0011310531,0.00056299125,0.013196682,0.0415441,0.87935483],"study_design_scores_gemma":[0.0000039127244,0.00004831139,0.009778449,0.030299593,0.00013346213,0.0010995984,0.002037793,0.00020786826,0.00032578563,0.002329109,0.9536956,0.000040546704],"about_ca_topic_score_codex":0.0066088405,"about_ca_topic_score_gemma":0.0101331035,"teacher_disagreement_score":0.012614849,"about_ca_system_score_codex":0.0026603877,"about_ca_system_score_gemma":0.006214336,"threshold_uncertainty_score":0.019302607},"labels":[],"label_agreement":null},{"id":"W2059822862","doi":"10.1061/(asce)me.1943-5479.0000332","title":"Behavioral Economic Concepts for Funding Infrastructure Rehabilitation","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Loss aversion; Behavioral economics; Bidding; Economics; Asset (computer security); Public economics; Asset management; Actuarial science; Business; Microeconomics; Marketing; Risk analysis (engineering); Computer science; Finance","score_opus":0.005159754096955541,"score_gpt":0.24571599159642268,"score_spread":0.24055623749946714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2059822862","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04613351,0.0074588894,0.82527125,0.009697353,0.0005323533,0.00041652602,0.0006473104,0.00009484835,0.10974799],"genre_scores_gemma":[0.829546,0.009368922,0.13845785,0.0012491322,0.00074640685,0.0015975556,0.0003903814,0.00008628084,0.01855749],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99824667,0.0010083249,0.00007180136,0.00013627791,0.0004041919,0.00013278326],"domain_scores_gemma":[0.99586475,0.0028492666,0.0005391191,0.00018254183,0.00042879768,0.00013550423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038360676,0.0014149185,0.0006305949,0.0021016223,0.00075090124,0.0026052722,0.0014257724,0.0018848439,0.007032453],"category_scores_gemma":[0.008320364,0.0003700566,0.0010151858,0.002062922,0.0025848094,0.0039179767,0.0012581444,0.002875131,0.00048838824],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012965714,0.00007089846,0.0008947017,0.00009210633,0.000021428981,0.000038355043,0.00009437685,0.050017223,0.00015921865,0.9380259,0.0009215312,0.009651281],"study_design_scores_gemma":[0.000021733653,0.00006941814,0.0023017945,0.00015227526,0.000032892316,0.00007157992,0.00029673072,0.12298505,0.00015625847,0.85684186,0.017031327,0.000038947994],"about_ca_topic_score_codex":0.0043541924,"about_ca_topic_score_gemma":0.0028488797,"teacher_disagreement_score":0.007032453,"about_ca_system_score_codex":0.0037899558,"about_ca_system_score_gemma":0.0022108962,"threshold_uncertainty_score":0.027498245},"labels":[],"label_agreement":null},{"id":"W2097096836","doi":"10.1061/(asce)0742-597x(2007)23:4(200)","title":"Project Delivery System Selection under Uncertainty: Multicriteria Multilevel Decision Aid Model","year":2007,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":93,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Analytic hierarchy process; Computer science; Operations research; Selection (genetic algorithm); Benchmark (surveying); Rank (graph theory); Process (computing); Interval (graph theory); Linear programming; Hierarchy; Set (abstract data type); Goal programming; Task (project management); Management science; Engineering; Artificial intelligence; Mathematics; Systems engineering","score_opus":0.10108751359006338,"score_gpt":0.3838952219365119,"score_spread":0.2828077083464485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097096836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1281525,0.00051645807,0.85363525,0.0014608377,0.00006484707,0.00028558707,0.00054168084,0.0004229459,0.014919953],"genre_scores_gemma":[0.9230839,0.00045244786,0.07034741,0.00011902117,0.000047864476,0.00041100365,0.000233602,0.000030200588,0.005274516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983021,0.0007876245,0.00007299604,0.00018879007,0.00040490265,0.00024364241],"domain_scores_gemma":[0.9977392,0.0013617896,0.0003360549,0.00006375124,0.0003678766,0.00013135723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026558987,0.00078025594,0.0015121266,0.0015086484,0.0008279458,0.0026642352,0.0021374116,0.0018696213,0.005305497],"category_scores_gemma":[0.0045038583,0.00066068856,0.0013270704,0.0016307863,0.0008547878,0.0015587296,0.0016528063,0.0016736446,0.00051535433],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058767797,0.000042338343,0.0007214025,0.000046491416,0.000046000107,0.00011875657,0.000081422884,0.9826985,0.0004066569,0.010313943,0.00030084993,0.0051648733],"study_design_scores_gemma":[0.000008547751,0.000020453841,0.00011089143,0.0000041544354,0.0000092424025,0.0000075581697,0.0000113064825,0.99773717,0.00004230732,0.0019102296,0.00013353731,0.0000046561113],"about_ca_topic_score_codex":0.012994998,"about_ca_topic_score_gemma":0.009070081,"teacher_disagreement_score":0.012994998,"about_ca_system_score_codex":0.0024414246,"about_ca_system_score_gemma":0.0015852789,"threshold_uncertainty_score":0.025838733},"labels":[],"label_agreement":null},{"id":"W2098088157","doi":"10.1061/(asce)me.1943-5479.0000013","title":"Attitude-Based Negotiation Methodology for the Management of Construction Disputes","year":2010,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Negotiation; Conflict resolution; Management science; Computer science; Resolution (logic); Process management; Operations research; Knowledge management; Business; Engineering; Political science; Artificial intelligence","score_opus":0.09458566992212401,"score_gpt":0.37213844592013623,"score_spread":0.2775527759980122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098088157","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012918123,0.000051127186,0.99631137,0.00011526921,0.00002739247,0.00028429346,0.000013111778,0.000060620958,0.0018450242],"genre_scores_gemma":[0.044043686,0.00010855645,0.95366675,0.000054235723,0.000030391291,0.0010872192,0.00004102087,0.000027456952,0.00094070606],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98072666,0.014689071,0.0008696676,0.0007274943,0.0026729517,0.00031415586],"domain_scores_gemma":[0.987763,0.008916735,0.00086523657,0.0005736089,0.0015808139,0.00030058355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016914127,0.0011708444,0.0011538058,0.0033335565,0.0022771822,0.0034947593,0.0033997146,0.0020305677,0.00647133],"category_scores_gemma":[0.024783814,0.0006683204,0.001552719,0.0030060946,0.0029920123,0.0050741863,0.0032183742,0.0024014474,0.0009466932],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010002518,0.00031697273,0.0010053131,0.0005259169,0.00013493055,0.000340494,0.0036305303,0.083380066,0.0032676954,0.7006913,0.0028910998,0.20371574],"study_design_scores_gemma":[0.00008372144,0.0002150455,0.0003303913,0.00018165847,0.00006256122,0.0002894054,0.0013237757,0.6760819,0.0017695074,0.30045894,0.019107163,0.00009589522],"about_ca_topic_score_codex":0.0011490778,"about_ca_topic_score_gemma":0.0016439031,"teacher_disagreement_score":0.016914127,"about_ca_system_score_codex":0.0021122089,"about_ca_system_score_gemma":0.003917232,"threshold_uncertainty_score":0.08945155},"labels":[],"label_agreement":null},{"id":"W2137564958","doi":"10.1061/(asce)me.1943-5479.0000297","title":"Construction Management Challenges and Best Practices for Rural Transit Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Traffic and Road Safety","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Scope (computer science); Staffing; Best practice; Agency (philosophy); Construction management; Environmental planning; Quality (philosophy); Benchmarking; Documentation; Desk; Project management; Environmental resource management; Engineering; Marketing; Civil engineering","score_opus":0.020603006397206823,"score_gpt":0.22760939558058318,"score_spread":0.20700638918337635,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2137564958","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94055724,0.002107807,0.0067304154,0.022768853,0.00008602308,0.00034561174,0.00006676529,0.00011147895,0.027225824],"genre_scores_gemma":[0.9872,0.0013350089,0.008516134,0.00030982512,0.000010905199,0.00008749242,0.000038482514,0.000018985369,0.0024829777],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9869441,0.0065058367,0.00077149936,0.0007100042,0.0030781173,0.0019904773],"domain_scores_gemma":[0.98677385,0.0032774208,0.0029208085,0.00097121525,0.0034079552,0.0026487578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008398721,0.00040733148,0.00035366713,0.0018647201,0.010318551,0.00652177,0.0023693836,0.001857501,0.0016118851],"category_scores_gemma":[0.019147603,0.0006793018,0.00026102428,0.0030374061,0.0038986187,0.0028062887,0.0046069296,0.0017554133,0.0003123733],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093644776,0.00068417995,0.11217752,0.001724716,0.0000675099,0.0059288163,0.50575423,0.004897596,0.006445122,0.013070016,0.016052399,0.33310422],"study_design_scores_gemma":[0.000018647861,0.0002590028,0.06210023,0.0008663844,0.000016994622,0.0015428794,0.8290853,0.0017253344,0.0011174165,0.0054361327,0.09773209,0.00009952039],"about_ca_topic_score_codex":0.041537583,"about_ca_topic_score_gemma":0.13684244,"teacher_disagreement_score":0.041537583,"about_ca_system_score_codex":0.008811259,"about_ca_system_score_gemma":0.034391817,"threshold_uncertainty_score":0.08259159},"labels":[],"label_agreement":null},{"id":"W2138906600","doi":"10.1061/(asce)0742-597x(2009)25:1(12)","title":"Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":212,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Construction management; Process (computing); Engineering; Construction industry; Quality (philosophy); Project management; Integrated project delivery; Simulation modeling; Construction engineering; Computer science; Operations research; Systems engineering; Civil engineering","score_opus":0.011925511758755848,"score_gpt":0.20372588228247263,"score_spread":0.1918003705237168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138906600","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889599,0.00006192442,0.0030135375,0.00010245797,0.0000051320912,0.000027059457,0.00001978259,0.000026128911,0.0077840807],"genre_scores_gemma":[0.9974632,0.000046380497,0.0011405121,0.000010500577,0.0000025433362,0.00001697832,0.000038731596,0.000011685018,0.0012695696],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9815655,0.0112608895,0.0006940518,0.00074801093,0.004013247,0.0017183042],"domain_scores_gemma":[0.9019159,0.063179724,0.013449801,0.005403545,0.008561256,0.0074897483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0145806875,0.0005869852,0.00036196012,0.0012236545,0.001494784,0.0024424025,0.00105414,0.00088518986,0.0054960568],"category_scores_gemma":[0.047162283,0.00041372117,0.00033815895,0.00095694966,0.0011492656,0.0013369444,0.0019238144,0.0012440622,0.00077094603],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005037501,0.0071365004,0.575343,0.0003694275,0.0002233397,0.0021389052,0.025721997,0.06617775,0.026598616,0.009408455,0.0014691846,0.28037536],"study_design_scores_gemma":[0.00024218057,0.0076208482,0.83466625,0.0002535638,0.00017442649,0.001306158,0.03231038,0.08430506,0.018340576,0.0042260434,0.01626192,0.0002925672],"about_ca_topic_score_codex":0.0076187225,"about_ca_topic_score_gemma":0.008877306,"teacher_disagreement_score":0.0145806875,"about_ca_system_score_codex":0.0026064978,"about_ca_system_score_gemma":0.0034962012,"threshold_uncertainty_score":0.077110946},"labels":[],"label_agreement":null},{"id":"W2146152604","doi":"10.1061/(asce)0742-597x(2008)24:3(173)","title":"Assessing Infrastructure Project Innovation Potential as a Function of Procurement Mode","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Shell (Canada)","funders":"Infrastructure Canada","keywords":"Integrated project delivery; Procurement; Business; General partnership; Process management; Process (computing); Function (biology); Variety (cybernetics); Stakeholder; Project management; Marketing; Finance; Economics; Systems engineering; Computer science; Engineering","score_opus":0.055131647583170476,"score_gpt":0.34441545465229045,"score_spread":0.28928380706912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146152604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.978583,0.00008280212,0.01312633,0.000052289524,0.0000042917927,0.0003653626,0.00027597262,0.0000701997,0.0074397367],"genre_scores_gemma":[0.9862135,0.000061979124,0.012274315,0.000008829746,0.0000030930332,0.00030641232,0.00018956498,0.0000133743915,0.0009289606],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9892079,0.0053867428,0.0008471805,0.0008843166,0.0030746832,0.0005991197],"domain_scores_gemma":[0.8977168,0.07645023,0.008978452,0.003482683,0.0114372065,0.0019345343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022124717,0.0005533677,0.0004524282,0.00535969,0.0006556445,0.0023324268,0.0007759188,0.0008377048,0.002278281],"category_scores_gemma":[0.05216537,0.00034860277,0.00088297896,0.003310759,0.0007635808,0.0024923945,0.0018590655,0.000661305,0.0004650725],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012991241,0.0007916664,0.7381012,0.00045104048,0.0002541755,0.0002817956,0.0028085657,0.099261045,0.013037462,0.0055962037,0.000555138,0.13756254],"study_design_scores_gemma":[0.00006749326,0.0068185315,0.7929137,0.0001835784,0.0002459129,0.00054737285,0.0055887136,0.16720738,0.017355857,0.0061100814,0.0027291204,0.00023224708],"about_ca_topic_score_codex":0.0017522933,"about_ca_topic_score_gemma":0.002809441,"teacher_disagreement_score":0.022124717,"about_ca_system_score_codex":0.0014247246,"about_ca_system_score_gemma":0.0014139282,"threshold_uncertainty_score":0.11700809},"labels":[],"label_agreement":null},{"id":"W2156128289","doi":"10.1061/(asce)0742-597x(2004)20:1(25)","title":"In-House Delivery of Multiple-Small Reconstruction Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Public Health","funders":"","keywords":"Scope (computer science); Dilemma; Integrated project delivery; Outsourcing; Prioritization; Business; Operations management; Process management; Procurement; Engineering management; Risk analysis (engineering); Project management; Engineering; Marketing; Computer science; Systems engineering","score_opus":0.010534095056898223,"score_gpt":0.1843697805794448,"score_spread":0.17383568552254658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156128289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9903842,0.000032303047,0.0059514293,0.0000566116,0.0000070578512,0.00029050934,0.00007819064,0.00006482807,0.0031348343],"genre_scores_gemma":[0.9874821,0.00008353639,0.008546791,0.000015418542,0.0000059919253,0.00008920917,0.000098671466,0.000027144022,0.0036510816],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986265,0.0006732167,0.000059235303,0.00011622178,0.00029067238,0.00023408831],"domain_scores_gemma":[0.9960168,0.0017454857,0.0006547076,0.00047250724,0.0006303059,0.00048012397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015297113,0.0004158054,0.00034074739,0.0007467424,0.0012661881,0.0007719918,0.00088047964,0.000496083,0.0060340683],"category_scores_gemma":[0.004970813,0.00033096864,0.00024596913,0.00061711506,0.00038313217,0.00064828055,0.0010402239,0.00041659517,0.0007179015],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023895183,0.010416711,0.17669807,0.0012837211,0.00017299083,0.015322895,0.01865542,0.057536628,0.058137823,0.0043728175,0.006165256,0.6488482],"study_design_scores_gemma":[0.00057304447,0.028999949,0.54119813,0.00038501012,0.00030029332,0.014183555,0.07033746,0.1476713,0.10692089,0.0030206046,0.086155616,0.00025420898],"about_ca_topic_score_codex":0.004058661,"about_ca_topic_score_gemma":0.009944838,"teacher_disagreement_score":0.0060340683,"about_ca_system_score_codex":0.001330764,"about_ca_system_score_gemma":0.0013612432,"threshold_uncertainty_score":0.020186007},"labels":[],"label_agreement":null},{"id":"W2407038954","doi":"10.1061/(asce)me.1943-5479.0000452","title":"Establishing Success Measurements of Joint Ventures in Mega Projects","year":2016,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Private Equity and Venture Capital","field":"Business, Management and Accounting","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Profitability index; Sustainability; Business; Measure (data warehouse); Industrial organization; Variety (cybernetics); Reputation; Reliability (semiconductor); Joint (building); Mega-; Market share; Marketing; Econometrics; Economics; Finance; Computer science","score_opus":0.03537085960156297,"score_gpt":0.22258551637330273,"score_spread":0.18721465677173976,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2407038954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913157,0.00008061106,0.0019957235,0.000054119497,0.000014181093,0.00012675287,0.00014938712,0.00001890698,0.006244563],"genre_scores_gemma":[0.9966924,0.000056745037,0.0023054732,0.000006178103,0.0000082467095,0.0001376334,0.00017694959,0.000005066957,0.0006113535],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99083894,0.003417463,0.0013445433,0.00046163017,0.003376869,0.00056062767],"domain_scores_gemma":[0.92766124,0.033232,0.018651664,0.002844237,0.013195295,0.0044155163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009442223,0.0003627007,0.0003673074,0.0048783473,0.0009924675,0.0021730463,0.00061153085,0.00054087007,0.001624619],"category_scores_gemma":[0.0542035,0.00023260011,0.0004166839,0.0034837371,0.001142289,0.0021590916,0.0028004409,0.00070960924,0.00039930994],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015604467,0.00029239853,0.92976516,0.00013982045,0.000092938375,0.00013104311,0.005143104,0.0012109336,0.000969133,0.0026987093,0.00066332927,0.058737326],"study_design_scores_gemma":[0.00001239146,0.00071849156,0.9788633,0.00008610964,0.00005484445,0.00014206086,0.010390334,0.0036538986,0.00179442,0.001225524,0.0030134132,0.000045311164],"about_ca_topic_score_codex":0.0010532667,"about_ca_topic_score_gemma":0.0024607996,"teacher_disagreement_score":0.009442223,"about_ca_system_score_codex":0.0010112807,"about_ca_system_score_gemma":0.0010353506,"threshold_uncertainty_score":0.049935877},"labels":[],"label_agreement":null},{"id":"W2776348486","doi":"10.1061/(asce)me.1943-5479.0000587","title":"Sustainable Delivery of Megaprojects in Iran: Integrated Model of Contextual Factors","year":2017,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":120,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Megaproject; Sustainability; Triple bottom line; Context (archaeology); Business; Structural equation modeling; Environmental economics; Supply chain; Sustainable development; Process management; Environmental resource management; Economics; Marketing; Computer science; Management; Political science","score_opus":0.08472870886236886,"score_gpt":0.3227454332777561,"score_spread":0.23801672441538727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2776348486","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8351321,0.0010896376,0.087668486,0.004162426,0.00010747141,0.0006839923,0.0009587723,0.00022966338,0.069967404],"genre_scores_gemma":[0.9870957,0.0006460773,0.009066836,0.000069210895,0.000015902573,0.00023093412,0.00015693916,0.000012551953,0.0027058413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99898463,0.0004099814,0.00003141232,0.00017009252,0.00016677621,0.00023708564],"domain_scores_gemma":[0.99882513,0.0004717611,0.00026151064,0.000045777884,0.00023612588,0.00015976191],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010944017,0.00081461656,0.00059218454,0.0017841792,0.0009982721,0.0030931644,0.0015660058,0.0011096066,0.0045354017],"category_scores_gemma":[0.002515825,0.00047004997,0.0013043731,0.002201271,0.0011984725,0.002528825,0.002120977,0.0011000485,0.00048321672],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002930749,0.00149153,0.24288037,0.000599369,0.0005047911,0.0020201062,0.010095904,0.41729078,0.0016075935,0.24925625,0.0047793523,0.06918081],"study_design_scores_gemma":[0.00017226285,0.00087981456,0.11927874,0.00043573292,0.0006942726,0.0006953228,0.017984217,0.75252277,0.000684996,0.08494109,0.02153161,0.00017920583],"about_ca_topic_score_codex":0.041792005,"about_ca_topic_score_gemma":0.036366463,"teacher_disagreement_score":0.041792005,"about_ca_system_score_codex":0.0047982717,"about_ca_system_score_gemma":0.006924633,"threshold_uncertainty_score":0.08309752},"labels":[],"label_agreement":null},{"id":"W2883714063","doi":"10.1061/(asce)me.1943-5479.0000639","title":"How to Improve Interface Management Behaviors in EPC Projects: Roles of Formal Practices and Social Norms","year":2018,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Procurement; Interface (matter); Knowledge management; Affect (linguistics); Project management; Psychology; Business; Computer science; Engineering; Marketing","score_opus":0.03898353472567932,"score_gpt":0.3395619891551394,"score_spread":0.3005784544294601,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2883714063","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9740863,0.000106872394,0.014772505,0.0010560076,0.000019688858,0.0001565071,0.000014313953,0.000074489304,0.009713236],"genre_scores_gemma":[0.99247724,0.00007817071,0.0068740128,0.000060468697,0.0000071977597,0.00010914728,0.000013149883,0.000010127292,0.00037040174],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9834372,0.0116799185,0.00075653935,0.00063010864,0.0028259566,0.00067031104],"domain_scores_gemma":[0.94008344,0.03182139,0.012423523,0.00451778,0.0076887785,0.0034650848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01863056,0.0004092207,0.00023438732,0.0012569323,0.0015234418,0.0035782703,0.0009660439,0.0007891358,0.0009927233],"category_scores_gemma":[0.06581049,0.0002624144,0.00021573169,0.00067442254,0.0027180018,0.0025693707,0.0024886737,0.0011411856,0.0001728446],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018624692,0.003266288,0.42870924,0.0006055067,0.00012213242,0.00042221826,0.0904291,0.003212029,0.008450411,0.011723909,0.0019956834,0.4508772],"study_design_scores_gemma":[0.00014342096,0.0019745093,0.74406683,0.00096666475,0.00014857801,0.00049331883,0.16021764,0.027781347,0.008926451,0.030699113,0.024305789,0.00027638327],"about_ca_topic_score_codex":0.0022425074,"about_ca_topic_score_gemma":0.0037580493,"teacher_disagreement_score":0.01863056,"about_ca_system_score_codex":0.00157792,"about_ca_system_score_gemma":0.0037503792,"threshold_uncertainty_score":0.09852904},"labels":[],"label_agreement":null},{"id":"W2937847675","doi":"10.1061/(asce)me.1943-5479.0000698","title":"Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Risk analysis (engineering); Schedule; Modular programming; Modular design; Identification (biology); Risk management; Process (computing); Computer science; Engineering; Systems engineering; Reliability engineering; Business","score_opus":0.006958685917370178,"score_gpt":0.2139265249411759,"score_spread":0.20696783902380572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937847675","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071196537,0.0001990111,0.9883404,0.00039982912,0.000021104715,0.00020409923,0.00006798135,0.00022722167,0.0034206375],"genre_scores_gemma":[0.43080902,0.00061436306,0.56510067,0.00012765806,0.00007810645,0.0009273488,0.00032724775,0.000058636717,0.0019569846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99372053,0.0025195275,0.00053505786,0.0007283659,0.001968503,0.00052801264],"domain_scores_gemma":[0.9952545,0.0019673542,0.00094840897,0.0002195947,0.0013470433,0.0002630095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009508935,0.0021583717,0.0015867499,0.0052921865,0.0013403,0.005015564,0.0032046135,0.0022143724,0.002435225],"category_scores_gemma":[0.008878502,0.0009151005,0.0017661586,0.002153786,0.0017269186,0.0034844077,0.004364085,0.0018000244,0.00039172627],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044890843,0.00015035253,0.0017106797,0.0001480081,0.00012958552,0.00022056824,0.000435767,0.881272,0.00114706,0.07645189,0.00085927587,0.037429936],"study_design_scores_gemma":[0.000018042361,0.000088201174,0.000423869,0.00008723589,0.00007040412,0.000068484835,0.00021524192,0.9596371,0.0005070247,0.036762815,0.0020842843,0.000037311733],"about_ca_topic_score_codex":0.008582234,"about_ca_topic_score_gemma":0.0076940595,"teacher_disagreement_score":0.009508935,"about_ca_system_score_codex":0.0035071846,"about_ca_system_score_gemma":0.0068531963,"threshold_uncertainty_score":0.050288677},"labels":[],"label_agreement":null},{"id":"W2958346082","doi":"10.1061/(asce)me.1943-5479.0000707","title":"Differentiation of Evaluation Criteria in Design-Build and Construction Manager at Risk Procurements","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Sample (material); Selection (genetic algorithm); Business; Operations management; Value (mathematics); Marketing; Computer science; Economics; Statistics; Mathematics","score_opus":0.042625944163370545,"score_gpt":0.32301174984595277,"score_spread":0.2803858056825822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2958346082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96631205,0.00037650086,0.020713108,0.00045140475,0.00003213487,0.0005021878,0.00005302643,0.000033355696,0.0115263],"genre_scores_gemma":[0.9832961,0.000059181773,0.01588912,0.000044988865,0.0000067223573,0.00020693339,0.00003853015,0.0000144367405,0.0004439846],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.8592682,0.09753261,0.010913272,0.001819715,0.026645463,0.003820794],"domain_scores_gemma":[0.72142243,0.20515852,0.021876778,0.005383494,0.040516436,0.005642407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.12374926,0.0005993242,0.0008601623,0.008886516,0.0022731882,0.005606962,0.001324128,0.00069624226,0.0022298766],"category_scores_gemma":[0.21678016,0.0004437215,0.00064980256,0.006103087,0.0033193582,0.0032534823,0.004383346,0.0012404858,0.00038366046],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030429356,0.0010285203,0.48841536,0.00088482344,0.00021227429,0.0005154816,0.04967822,0.0072625573,0.005499372,0.02599167,0.001924496,0.41554427],"study_design_scores_gemma":[0.00026775434,0.0032706908,0.7783712,0.0012384054,0.00018020083,0.0007719127,0.10525361,0.05100198,0.013017615,0.034343082,0.011719867,0.00056362594],"about_ca_topic_score_codex":0.0034448744,"about_ca_topic_score_gemma":0.005704928,"teacher_disagreement_score":0.12374926,"about_ca_system_score_codex":0.005370385,"about_ca_system_score_gemma":0.0046031005,"threshold_uncertainty_score":0.6544565},"labels":[],"label_agreement":null},{"id":"W3017718767","doi":"10.1061/(asce)me.1943-5479.0000789","title":"Air Transportation Infrastructure Robustness Assessment for Proactive Systemic Risk Management","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McMaster University","funders":"","keywords":"Robustness (evolution); Computer science; Risk analysis (engineering); Business","score_opus":0.004711929787514537,"score_gpt":0.21334757235590032,"score_spread":0.2086356425683858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3017718767","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.270397,0.0010479133,0.71575403,0.00046642133,0.000055137905,0.00031482422,0.0007532797,0.00035187224,0.0108594885],"genre_scores_gemma":[0.9734892,0.00027531243,0.025361327,0.000023821158,0.000022819142,0.00009116791,0.00021306638,0.000016149113,0.00050719094],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988098,0.00043331232,0.00006655594,0.00016256388,0.00042559116,0.000102275124],"domain_scores_gemma":[0.9972606,0.0011867797,0.0007431694,0.00020615825,0.000506269,0.00009697088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026901003,0.0012174955,0.00045001795,0.003748612,0.00041550802,0.0016002335,0.00070994033,0.00074524595,0.0016987119],"category_scores_gemma":[0.0071414365,0.00025345682,0.0008777363,0.001230077,0.0007100289,0.0017702787,0.0015124694,0.0007016483,0.00014398035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006773776,0.000073996795,0.024613626,0.00019451803,0.00023323049,0.00016332827,0.00013989459,0.9006866,0.004557789,0.018784069,0.00077656354,0.049708568],"study_design_scores_gemma":[0.000004333309,0.0001187467,0.015229141,0.00006694495,0.00008136807,0.00007685933,0.00020416659,0.96787095,0.002555932,0.012417115,0.0013353132,0.000039193324],"about_ca_topic_score_codex":0.0059449337,"about_ca_topic_score_gemma":0.005656858,"teacher_disagreement_score":0.0059449337,"about_ca_system_score_codex":0.0016770965,"about_ca_system_score_gemma":0.0014996942,"threshold_uncertainty_score":0.014226794},"labels":[],"label_agreement":null},{"id":"W3035558579","doi":"10.1061/(asce)me.1943-5479.0000815","title":"Fuzzy Agent-Based Multicriteria Decision-Making Model for Analyzing Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources","funders":"","keywords":"Crew; Multiple-criteria decision analysis; Scope (computer science); Process (computing); Computer science; Operations research; Fuzzy logic; Decision support system; Decision-making models; Management science; Risk analysis (engineering); Engineering; Artificial intelligence; Business","score_opus":0.014321942958857596,"score_gpt":0.22967911140850905,"score_spread":0.21535716844965144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035558579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044651903,0.00034138575,0.9423035,0.00085805135,0.00008430833,0.00018075346,0.00024460422,0.00019349268,0.011141996],"genre_scores_gemma":[0.8459791,0.00044234112,0.14460653,0.00014199741,0.00005148994,0.00053894933,0.0002132748,0.000025645468,0.008000521],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906915,0.00041154237,0.000045319615,0.00018198449,0.00017126687,0.00012076383],"domain_scores_gemma":[0.99885035,0.0006597547,0.00016686515,0.00003548146,0.0002041558,0.00008334872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001968598,0.0010594598,0.0012130153,0.0010290615,0.00087175885,0.0021324686,0.0019765603,0.0021989243,0.0037965812],"category_scores_gemma":[0.0028523973,0.00055044895,0.0010147884,0.0011032011,0.0008346642,0.0013491394,0.0010484587,0.0015158021,0.00041615794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003428211,0.000035891728,0.0004843704,0.000024587485,0.00003476043,0.000076746226,0.00007265175,0.9798747,0.00027379053,0.015175623,0.00028597063,0.0036266858],"study_design_scores_gemma":[0.0000065165796,0.000010792176,0.000057179965,0.0000035873109,0.00000627594,0.0000046719847,0.000013223795,0.9969408,0.000045954817,0.002677769,0.00022897303,0.000004237484],"about_ca_topic_score_codex":0.0154606495,"about_ca_topic_score_gemma":0.013018144,"teacher_disagreement_score":0.0154606495,"about_ca_system_score_codex":0.0025193167,"about_ca_system_score_gemma":0.0022932203,"threshold_uncertainty_score":0.030741274},"labels":[],"label_agreement":null},{"id":"W3037838347","doi":"10.1061/(asce)me.1943-5479.0000822","title":"Prioritizing Preproject Planning Activities Using Value of Information Analysis","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Scope (computer science); Prioritization; Resource allocation; Computer science; Process (computing); Reuse; Risk analysis (engineering); Operations research; Process management; Business; Engineering","score_opus":0.01462366445022767,"score_gpt":0.24653061715950397,"score_spread":0.2319069527092763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037838347","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044844247,0.00052733807,0.9439588,0.00051848945,0.000022027241,0.0005508777,0.00019169463,0.00040073635,0.0089857215],"genre_scores_gemma":[0.47534162,0.00047938302,0.52160954,0.000046061774,0.000023476814,0.00041209493,0.000382786,0.00016754754,0.0015375656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99400806,0.0029264623,0.00031977266,0.0005010599,0.0017578469,0.0004867472],"domain_scores_gemma":[0.9898323,0.00625433,0.0013993492,0.0006671259,0.0015642536,0.00028266158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006622535,0.0020730372,0.0017951278,0.0062279375,0.0010780632,0.004819618,0.0016442005,0.0008847172,0.0031970977],"category_scores_gemma":[0.01246757,0.00089668337,0.0015966083,0.0042309063,0.00089488673,0.0037110236,0.0022691998,0.0014132693,0.00033051835],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019962968,0.0003936965,0.010232804,0.00067534007,0.00027685825,0.00024012149,0.00068505725,0.5211237,0.006737602,0.043307662,0.0024791302,0.41364837],"study_design_scores_gemma":[0.000034135934,0.00037730142,0.005527565,0.00019703989,0.00015736846,0.00012609939,0.0007384417,0.940995,0.007830224,0.0385464,0.0053536925,0.00011669507],"about_ca_topic_score_codex":0.007700667,"about_ca_topic_score_gemma":0.012443459,"teacher_disagreement_score":0.007700667,"about_ca_system_score_codex":0.0034005127,"about_ca_system_score_gemma":0.00719156,"threshold_uncertainty_score":0.03502375},"labels":[],"label_agreement":null},{"id":"W3043380076","doi":"10.1061/(asce)me.1943-5479.0000818","title":"Probabilistic Resilience-Guided Infrastructure Risk Management","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Resilience (materials science); Risk analysis (engineering); Probabilistic logic; Hazard; Risk management; Natural hazard; Computer science; Environmental resource management; Realization (probability); Reliability engineering; Business; Engineering; Environmental science; Finance","score_opus":0.006286498621614063,"score_gpt":0.20722946852536478,"score_spread":0.2009429699037507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3043380076","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019536035,0.0003376907,0.9695388,0.0007155017,0.00004092709,0.00008262983,0.00014475569,0.00021684318,0.009386897],"genre_scores_gemma":[0.92669445,0.0005450121,0.068806104,0.000093759554,0.00005240863,0.0001836404,0.00013698945,0.00006543642,0.0034221264],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989641,0.00035416143,0.00004588321,0.00016405951,0.00030780645,0.00016398379],"domain_scores_gemma":[0.9979144,0.0010937124,0.000415959,0.00011650343,0.00034882285,0.000110640576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023084558,0.0012041826,0.00081155926,0.0017443582,0.0006427927,0.0018048648,0.0020448947,0.0011361501,0.0032614279],"category_scores_gemma":[0.0058776774,0.00055943144,0.00086967647,0.0008419721,0.0015233032,0.0023130674,0.0033029765,0.0013422455,0.0002175714],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007238632,0.0000072096686,0.0003337305,0.000026235159,0.000015799365,0.000041640356,0.000035008026,0.96444815,0.00033142263,0.029501697,0.0002955396,0.0049562673],"study_design_scores_gemma":[0.0000023626797,0.000014504838,0.00019933913,0.00001658319,0.000009161934,0.000030707793,0.000034489964,0.9683141,0.00018718626,0.030527456,0.00065101497,0.000013096258],"about_ca_topic_score_codex":0.0068402817,"about_ca_topic_score_gemma":0.0059424154,"teacher_disagreement_score":0.0068402817,"about_ca_system_score_codex":0.0021023713,"about_ca_system_score_gemma":0.00239174,"threshold_uncertainty_score":0.015253842},"labels":[],"label_agreement":null},{"id":"W3136866223","doi":"10.1061/(asce)me.1943-5479.0000923","title":"Multidomain Drivers of Occupant Comfort, Productivity, and Well-Being in Buildings: Insights from an Exploratory and Explanatory Analysis","year":2021,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Productivity; Computer science; Context (archaeology); Random forest; Quality (philosophy); Thermal comfort; Machine learning; Artificial intelligence; Geography","score_opus":0.004454773682254938,"score_gpt":0.19129243508369373,"score_spread":0.1868376614014388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136866223","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9929985,0.000096117656,0.005580294,0.00016098304,0.0000033557378,0.00004476101,0.00032145696,0.000013000135,0.00078152044],"genre_scores_gemma":[0.9975682,0.0000452827,0.001991358,0.0000118755,0.0000034801944,0.00003687536,0.000238911,0.0000040173622,0.00010006637],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99842036,0.001044118,0.0000664622,0.00016515981,0.00019192247,0.00011194366],"domain_scores_gemma":[0.9916122,0.006478903,0.00073290546,0.0004620982,0.0005479602,0.0001658754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038776316,0.00057479687,0.00035602428,0.001865353,0.00045630263,0.0016796131,0.00047315808,0.00043856286,0.0015164561],"category_scores_gemma":[0.006544422,0.00028615835,0.0012842745,0.0017364674,0.0009015382,0.0011209986,0.0017732463,0.0008807229,0.00015886084],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016062206,0.00028872406,0.9480889,0.00021000432,0.0004160232,0.00036040237,0.009590633,0.00976075,0.0011453625,0.0052085114,0.00051283994,0.024257232],"study_design_scores_gemma":[0.000006479197,0.00026828225,0.9152523,0.00012472834,0.0001235478,0.00018195003,0.016629295,0.061094373,0.0007091624,0.004259664,0.0012932697,0.000057015826],"about_ca_topic_score_codex":0.0051636584,"about_ca_topic_score_gemma":0.0069650817,"teacher_disagreement_score":0.0051636584,"about_ca_system_score_codex":0.00065222074,"about_ca_system_score_gemma":0.00055063656,"threshold_uncertainty_score":0.020507097},"labels":[],"label_agreement":null},{"id":"W3163210510","doi":"10.1061/(asce)me.1943-5479.0000914","title":"Causes of Defects Associated with Tolerances in Construction: A Case Study","year":2021,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Context (archaeology); Identification (biology); Empirical research; Damage tolerance; Risk analysis (engineering); Management science; Operations management; Knowledge management; Engineering; Computer science; Business; Geography; Mathematics","score_opus":0.04605219968653328,"score_gpt":0.315142906904161,"score_spread":0.26909070721762773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163210510","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98010385,0.00060289656,0.011453165,0.0014833212,0.000036576817,0.0002585546,0.00006382815,0.000030283307,0.0059674946],"genre_scores_gemma":[0.9877132,0.0011650941,0.007074738,0.00026237726,0.000027176386,0.00010370352,0.000037150996,0.000027114307,0.003589475],"study_design_codex":"case_report","study_design_gemma":"observational","domain_scores_codex":[0.9939407,0.002806162,0.000324599,0.00041061913,0.001796389,0.00072149973],"domain_scores_gemma":[0.98402065,0.010236108,0.002449131,0.00075177266,0.0013918987,0.001150448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044503775,0.0007391224,0.00048318467,0.0028792543,0.006427606,0.0023442707,0.0023039607,0.0050595137,0.0022308973],"category_scores_gemma":[0.01344364,0.0007455194,0.0007777676,0.0024093979,0.0033886787,0.0015912789,0.0033114234,0.0023847271,0.00031103307],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002683933,0.0023634182,0.13096102,0.0016218884,0.00011820951,0.43631545,0.29411688,0.011000317,0.0060514086,0.014155877,0.0053976346,0.09762955],"study_design_scores_gemma":[0.000071135444,0.0020032248,0.09274977,0.0016464253,0.00020341792,0.2781117,0.5269351,0.01590676,0.008759069,0.008982529,0.06436986,0.00026094628],"about_ca_topic_score_codex":0.0069047404,"about_ca_topic_score_gemma":0.01865896,"teacher_disagreement_score":0.0069047404,"about_ca_system_score_codex":0.0033744245,"about_ca_system_score_gemma":0.0034930725,"threshold_uncertainty_score":0.024483323},"labels":[],"label_agreement":null},{"id":"W4200137561","doi":"10.1061/(asce)me.1943-5479.0001009","title":"New Modes of Operating for Construction Organizations during the COVID-19 Pandemic: Challenges, Actions, and Future Best Practices","year":2021,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"COVID-19 Pandemic Impacts","field":"Economics, Econometrics and Finance","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Pandemic; Business; Control (management); Workforce; Productivity; Coronavirus disease 2019 (COVID-19); Best practice; Public relations; Environmental planning; Political science; Economic growth; Geography; Economics; Management","score_opus":0.08557894207837036,"score_gpt":0.2981451088667335,"score_spread":0.21256616678836315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200137561","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6444333,0.0126474025,0.043377772,0.2227509,0.0010937111,0.0020941067,0.0006149849,0.0008283564,0.072159424],"genre_scores_gemma":[0.93016773,0.0074826432,0.053249832,0.004395028,0.000109221655,0.0007194804,0.0003062893,0.000059938262,0.0035098616],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9800402,0.0100572,0.0011298392,0.0008374844,0.003164898,0.0047703204],"domain_scores_gemma":[0.9768877,0.00548391,0.003934674,0.0019268186,0.005545595,0.0062213363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018273594,0.001233066,0.0005892821,0.0033050445,0.009130623,0.00850284,0.0035222718,0.0033237955,0.0028346665],"category_scores_gemma":[0.020303769,0.000686628,0.0011095527,0.0025921147,0.0052091507,0.007555968,0.00719747,0.0036212604,0.0006732473],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023113593,0.0012968512,0.2987804,0.0036052137,0.00022609711,0.0015143995,0.10018843,0.0045442083,0.008375992,0.017211039,0.026014693,0.53801155],"study_design_scores_gemma":[0.00006697981,0.0011567794,0.20985213,0.004884638,0.000108033404,0.0008161625,0.63692755,0.0040817894,0.0023040655,0.014426805,0.1249018,0.0004733125],"about_ca_topic_score_codex":0.02766602,"about_ca_topic_score_gemma":0.0847182,"teacher_disagreement_score":0.02766602,"about_ca_system_score_codex":0.009647005,"about_ca_system_score_gemma":0.034178272,"threshold_uncertainty_score":0.09664112},"labels":[],"label_agreement":null},{"id":"W4283801114","doi":"10.1061/(asce)me.1943-5479.0001071","title":"Managing Interdependence-Induced Systemic Risks in Infrastructure Projects","year":2022,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Operationalization; Risk analysis (engineering); Risk management; Systemic risk; Project management; Process management; Performance indicator; Critical infrastructure; Resilience (materials science); Interdependence; Business; Schedule; Identification (biology); General partnership; Computer science; Systems engineering; Engineering; Economics","score_opus":0.06390578444886319,"score_gpt":0.33313748326927123,"score_spread":0.26923169882040804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283801114","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5495758,0.00032072992,0.44522825,0.00032218013,0.000015348756,0.00020823785,0.00004937013,0.0000590214,0.0042211176],"genre_scores_gemma":[0.97902006,0.0001406182,0.02046112,0.000009800992,0.0000045507704,0.00006984818,0.000018412331,0.000008156814,0.00026751426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9954432,0.002892544,0.00016947775,0.00041091014,0.00074033235,0.00034352674],"domain_scores_gemma":[0.98873,0.0073631327,0.0024185148,0.00044566012,0.00071336835,0.00032939686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067511355,0.000865484,0.000525664,0.0018327537,0.00074065384,0.0023612867,0.00087800104,0.0009493039,0.00068095885],"category_scores_gemma":[0.015846923,0.0005660162,0.00052689423,0.001440041,0.0012237984,0.002071359,0.0027221409,0.00090327894,0.000052618543],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075215874,0.00012397405,0.016428864,0.000112234215,0.0001332907,0.0003833936,0.0004963218,0.92946833,0.0029411875,0.01868758,0.0001673108,0.030982213],"study_design_scores_gemma":[0.000011814101,0.00023046213,0.00954389,0.00005330848,0.00006412678,0.00015479166,0.00069578877,0.9601011,0.0017146682,0.026579898,0.0008136134,0.000036578436],"about_ca_topic_score_codex":0.0024746705,"about_ca_topic_score_gemma":0.0031981207,"teacher_disagreement_score":0.0067511355,"about_ca_system_score_codex":0.0016618557,"about_ca_system_score_gemma":0.0020954271,"threshold_uncertainty_score":0.035703838},"labels":[],"label_agreement":null},{"id":"W4323816430","doi":"10.1061/jmenea.meeng-5225","title":"Sustainable Infrastructure Is a Two-Way Street: Balancing Environmental and Condition Performance Goals","year":2023,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Global warming; Pavement management; Transport engineering; Computer science; Network performance; Performance indicator; Environmental economics; Operations research; Business; Environmental resource management; Climate change; Environmental science; Engineering; Economics","score_opus":0.0019764230779899567,"score_gpt":0.18059561488504106,"score_spread":0.1786191918070511,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323816430","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6531897,0.00029929666,0.31571153,0.0017312375,0.000036034457,0.00017491134,0.0003694622,0.00043632393,0.028051412],"genre_scores_gemma":[0.9743342,0.00013675104,0.023913864,0.000024589579,0.0000076092692,0.00004549914,0.000095120544,0.000030042338,0.0014123833],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99866116,0.0006017667,0.000034913366,0.00021181814,0.00027873865,0.00021170828],"domain_scores_gemma":[0.999064,0.00035687903,0.0002033194,0.00009852289,0.00017405862,0.00010330527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001614335,0.00052772305,0.0004371377,0.0008134495,0.0005039078,0.0024066393,0.00069609104,0.0012617337,0.0018262698],"category_scores_gemma":[0.0032760112,0.0003511039,0.00044100883,0.0011230401,0.0008931771,0.0029286263,0.0012254443,0.0005888846,0.00025679872],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004796448,0.00008879339,0.0055247257,0.00004230482,0.00003885694,0.000070151575,0.000064743865,0.9613262,0.0021947431,0.015025678,0.0003374435,0.015238402],"study_design_scores_gemma":[0.000019774374,0.00029161334,0.009830155,0.00003672868,0.000046079993,0.00006968018,0.0005745187,0.9600537,0.002957335,0.022333795,0.003744011,0.00004253586],"about_ca_topic_score_codex":0.012287555,"about_ca_topic_score_gemma":0.023292001,"teacher_disagreement_score":0.012287555,"about_ca_system_score_codex":0.002580735,"about_ca_system_score_gemma":0.00359658,"threshold_uncertainty_score":0.024432063},"labels":[],"label_agreement":null},{"id":"W4399568055","doi":"10.1061/jmenea.meeng-6106","title":"Forecasting Construction Material Prices Using Macroeconomic Indicators of Trading Partners","year":2024,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Forecasting Techniques and Applications","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Construction industry; Economics; Economic indicator; Industrial organization; Finance; Macroeconomics; Engineering; Construction engineering","score_opus":0.08104265183551933,"score_gpt":0.35597320324028703,"score_spread":0.2749305514047677,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399568055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9804551,0.000119647186,0.015780423,0.0001897653,0.000022325159,0.00003142305,0.00084019057,0.000091379734,0.0024698048],"genre_scores_gemma":[0.996603,0.00008154027,0.0024986062,0.000005430279,0.000007762294,0.000007797097,0.00062255847,0.0000036419362,0.00016971468],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971443,0.00007030998,0.000023743843,0.00006997678,0.000076997654,0.000044554028],"domain_scores_gemma":[0.9984919,0.0006103474,0.0004448667,0.000101571204,0.0002751096,0.00007627309],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001044084,0.00039236684,0.000287315,0.0011437334,0.00014154275,0.0012029823,0.0003482085,0.0005285242,0.00069730636],"category_scores_gemma":[0.0051751127,0.00025722978,0.0004053772,0.0015460668,0.00015942975,0.0011397137,0.00049996615,0.00071793905,0.00022085427],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030007688,0.00016421701,0.5050266,0.000061435785,0.0001767075,0.0002826453,0.00021561723,0.43295214,0.0023642208,0.005297758,0.002037052,0.051121578],"study_design_scores_gemma":[0.000008600866,0.000032815147,0.067085676,0.000008154754,0.000028939223,0.000012412383,0.000086165506,0.9306822,0.0006261761,0.0009848526,0.00042813044,0.00001577995],"about_ca_topic_score_codex":0.017279848,"about_ca_topic_score_gemma":0.017095258,"teacher_disagreement_score":0.017279848,"about_ca_system_score_codex":0.0006964812,"about_ca_system_score_gemma":0.00067881413,"threshold_uncertainty_score":0.03435856},"labels":[],"label_agreement":null},{"id":"W4407984856","doi":"10.1061/jmenea.meeng-6312","title":"Coming Clean: The Impact of Firm Internationalization on Environmental Information Disclosure in the Construction Industry","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Corporate Social Responsibility Reporting","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Internationalization; Business; Industrial organization; Construction industry; International trade; Construction engineering; Engineering","score_opus":0.008382131036297001,"score_gpt":0.23778384231168825,"score_spread":0.22940171127539125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407984856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9954867,0.00026699965,0.00019898558,0.0005993343,0.000008665651,0.000014645666,0.0001681755,0.000004485385,0.0032521104],"genre_scores_gemma":[0.99944144,0.00009268054,0.00004037653,0.000040575327,0.000012123049,0.0000043461346,0.000120090095,0.0000016263208,0.00024668395],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99467635,0.0020216745,0.00052461185,0.00065734517,0.0010078674,0.0011122092],"domain_scores_gemma":[0.8696158,0.04727845,0.071457736,0.0036042174,0.0040425733,0.0040012067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005327046,0.0002093858,0.0003245333,0.0015091556,0.0009466107,0.0041224235,0.0005258695,0.0006867059,0.0036133875],"category_scores_gemma":[0.032381386,0.00013748265,0.00045524884,0.0029628556,0.001701904,0.002483962,0.0028963883,0.0017495779,0.0002777811],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007776183,0.0001233647,0.99108773,0.000022242917,0.00006518613,0.00011325982,0.0012695446,0.00054020976,0.00009536041,0.0006916544,0.00035516554,0.00555867],"study_design_scores_gemma":[0.000006359436,0.000078217585,0.9917938,0.00002652597,0.000045521047,0.000050557985,0.005621694,0.00064391445,0.00031281248,0.00046105625,0.0009468031,0.0000127064395],"about_ca_topic_score_codex":0.011675698,"about_ca_topic_score_gemma":0.012299292,"teacher_disagreement_score":0.011675698,"about_ca_system_score_codex":0.0015113077,"about_ca_system_score_gemma":0.0013336297,"threshold_uncertainty_score":0.028172433},"labels":[],"label_agreement":null},{"id":"W4412588980","doi":"10.1061/jmenea.meeng-6699","title":"Assessing Individual Route-Level Distress from Collective Distress by Applying Multitask Learning to Promote Older Adults’ Daily Walking","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"Mental Health Research Topics","field":"Psychology","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Distress; Psychology; Applied psychology; Cognitive psychology; Operations management; Business; Engineering; Clinical psychology","score_opus":0.03285313881632391,"score_gpt":0.3590938803970773,"score_spread":0.3262407415807534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412588980","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96003675,0.00033407327,0.03731095,0.00030590835,0.00003938468,0.000117955955,0.00046021695,0.00020855627,0.0011862294],"genre_scores_gemma":[0.9871946,0.00012886671,0.011717618,0.00005838144,0.000017118422,0.000083686915,0.00033622162,0.000006654598,0.00045687432],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970144,0.00010292576,0.000023578092,0.000093442344,0.000040879007,0.000037694794],"domain_scores_gemma":[0.99850416,0.00082588376,0.00023827328,0.00008678894,0.00019225352,0.00015265234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009469557,0.00084179454,0.00039674572,0.0008456253,0.00022839167,0.0005944116,0.000436614,0.000539438,0.0010136691],"category_scores_gemma":[0.004632624,0.0002075371,0.0005747558,0.0003804526,0.00013452349,0.0008299996,0.00081679807,0.00083549466,0.00024020228],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00080054154,0.0024724314,0.5854727,0.0004978128,0.0005364062,0.00019943471,0.0016112878,0.071375355,0.004056907,0.00060524564,0.002807856,0.329564],"study_design_scores_gemma":[0.00006215821,0.0013274957,0.24877037,0.00015266024,0.00031266874,0.00008633089,0.0009639917,0.74093866,0.0019997929,0.0034654127,0.0018383275,0.00008207905],"about_ca_topic_score_codex":0.0072873835,"about_ca_topic_score_gemma":0.013285372,"teacher_disagreement_score":0.0072873835,"about_ca_system_score_codex":0.00043902715,"about_ca_system_score_gemma":0.0003826618,"threshold_uncertainty_score":0.014489949},"labels":[],"label_agreement":null},{"id":"W4416108550","doi":"10.1061/jmenea.meeng-7068","title":"Forecasting Construction Equipment Productivity Based on Weather Conditions: A Data-Driven Time-Series Machine Learning Approach","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Leverage (statistics); Construction management; Field (mathematics); Autoregressive model; Project management; Automation; Construction industry","score_opus":0.014199284189216642,"score_gpt":0.2140958393359872,"score_spread":0.19989655514677054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416108550","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47657773,0.000582649,0.51701903,0.00065005606,0.000106853004,0.00010376034,0.0012299599,0.0010907798,0.0026392106],"genre_scores_gemma":[0.9628773,0.0002227622,0.03546931,0.00003220071,0.000039205963,0.0000591621,0.000715786,0.00002006149,0.0005643147],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999684,0.000087091415,0.000031011492,0.000092596645,0.00007141584,0.000033939556],"domain_scores_gemma":[0.99912685,0.00048381902,0.00013681433,0.000057188186,0.00015930863,0.000035984653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009817648,0.00067568093,0.0005489256,0.0014505169,0.00017639344,0.0007997596,0.0007912517,0.0007516103,0.00059829716],"category_scores_gemma":[0.002476148,0.00033548332,0.00058221404,0.001321281,0.00019191855,0.00085545995,0.0003588045,0.0007058151,0.00017770515],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058969927,0.00015219,0.013898284,0.000059212314,0.00008252589,0.00010272531,0.00005799454,0.9284931,0.0015079502,0.0013002506,0.00061636657,0.053670507],"study_design_scores_gemma":[0.0000015126111,0.000007948306,0.0018146315,0.0000029483801,0.0000054873526,0.0000052286387,0.000011285213,0.9974667,0.00019007403,0.00038759867,0.00010295113,0.00000371729],"about_ca_topic_score_codex":0.011918542,"about_ca_topic_score_gemma":0.010159846,"teacher_disagreement_score":0.011918542,"about_ca_system_score_codex":0.00062477955,"about_ca_system_score_gemma":0.0004868776,"threshold_uncertainty_score":0.02369833},"labels":[],"label_agreement":null}]}