{"meta":{"query_hash":"8e9ab754de53","filters":{"venue":"Journal of Project Management"},"cohort_total":210,"direct_labels_cover":0,"predictions_cover":210,"exported":210,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/8e9ab754de53","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Project+Management"},"results":[{"id":"W2583118393","doi":"10.5267/j.jpm.2017.1.004","title":"Project manager selection based on project manager competency model: PCA–MCDM Ap-proach","year":2016,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Collaboration in agile enterprises","field":"Business, Management and Accounting","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project manager; Context (archaeology); Multiple-criteria decision analysis; Computer science; Functional manager; Project management; Order (exchange); Selection (genetic algorithm); Basis of estimate; Engineering management; Function (biology); Project stakeholder; Knowledge management; Project management triangle; Process management; Operations research; Business; Project charter; Engineering; Systems engineering; Artificial intelligence","score_opus":0.026125006525494248,"score_gpt":0.26928501145643136,"score_spread":0.24316000493093712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2583118393","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13670017,0.00017707607,0.84856296,0.00059427886,0.000027165544,0.00084291806,0.00026563264,0.00016916372,0.0126607735],"genre_scores_gemma":[0.6443754,0.00023078859,0.35221466,0.000050681698,0.000012286746,0.00063174166,0.00021400354,0.000030400504,0.0022400713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975152,0.0012707888,0.00009003739,0.00018037324,0.0007907329,0.00015282436],"domain_scores_gemma":[0.99851424,0.00085992087,0.00014345237,0.000054993245,0.0003734113,0.000054061762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002188766,0.000635036,0.0006161609,0.0030247301,0.00080118113,0.0013966238,0.00090711185,0.00061064935,0.0026886233],"category_scores_gemma":[0.0051096696,0.0004302098,0.0006495481,0.002733433,0.0004734757,0.00072340807,0.0007807286,0.00070545735,0.00029801784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019615683,0.0006047299,0.025314003,0.0008126297,0.00024243745,0.0006123174,0.0018024346,0.6103548,0.0057934364,0.0385184,0.006096752,0.3096519],"study_design_scores_gemma":[0.000036300862,0.00010955046,0.005321059,0.00007752986,0.000033575183,0.00015110383,0.00071560143,0.9777915,0.0012790372,0.012027854,0.0024185677,0.00003833894],"about_ca_topic_score_codex":0.010821582,"about_ca_topic_score_gemma":0.012913111,"teacher_disagreement_score":0.010821582,"about_ca_system_score_codex":0.0012558188,"about_ca_system_score_gemma":0.0027052243,"threshold_uncertainty_score":0.021517158},"labels":[],"label_agreement":null},{"id":"W2604119440","doi":"10.5267/j.jpm.2017.3.001","title":"Implementation of multi-criteria decision making approach for the team leader selection in IT sector","year":2016,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Collaboration in agile enterprises","field":"Business, Management and Accounting","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Multiple-criteria decision analysis; Teamwork; Selection (genetic algorithm); Ranking (information retrieval); Team software process; Team composition; Team effectiveness; Computer science; Quality (philosophy); Software; Knowledge management; Team management; Point (geometry); Process (computing); Work (physics); Rank (graph theory); Software development; Operations research; Software development process; Engineering; Artificial intelligence; Mathematics; Management; Economics","score_opus":0.05247284498759571,"score_gpt":0.35603309630323704,"score_spread":0.30356025131564135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2604119440","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056096286,0.00056992716,0.9331442,0.0007475022,0.00011513607,0.0011980801,0.00012523578,0.0001879942,0.007815701],"genre_scores_gemma":[0.433007,0.000398338,0.5638531,0.00013295336,0.000035160057,0.0009219367,0.0001284154,0.000026855922,0.0014963183],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99292517,0.004661326,0.0003560463,0.00047264976,0.0011223456,0.0004624235],"domain_scores_gemma":[0.9959747,0.0024978549,0.00033399218,0.00009756028,0.00084523996,0.00025064836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009083278,0.0012887194,0.0019040866,0.0027970925,0.0021592316,0.0031183136,0.0026115233,0.0018418386,0.004526186],"category_scores_gemma":[0.006978214,0.0007770579,0.001827147,0.0026779047,0.00078590296,0.0015615306,0.0020031265,0.001978712,0.00031377136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004304774,0.00070767716,0.0038733154,0.0011987335,0.0004267357,0.0006236266,0.0014458534,0.8005055,0.0034054976,0.02048881,0.0022667793,0.16462693],"study_design_scores_gemma":[0.000118624645,0.0004357112,0.00097633037,0.00017762753,0.000093719704,0.000061921965,0.00095583335,0.9799391,0.0014944351,0.013154968,0.002531329,0.000060386104],"about_ca_topic_score_codex":0.007460488,"about_ca_topic_score_gemma":0.009530607,"teacher_disagreement_score":0.009083278,"about_ca_system_score_codex":0.0027276482,"about_ca_system_score_gemma":0.005062635,"threshold_uncertainty_score":0.04803753},"labels":[],"label_agreement":null},{"id":"W2622216269","doi":"10.5267/j.jpm.2017.5.001","title":"Modeling and analyzing the impact of lean principles on organizational performance using ISM approach","year":2017,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Competitor analysis; Lean manufacturing; Context (archaeology); Productivity; Lean project management; Automotive industry; Quality (philosophy); Business; Advanced manufacturing; Manufacturing engineering; Process management; Work (physics); Computer science; Engineering; Marketing; Economics","score_opus":0.08714185813659239,"score_gpt":0.3118202505189136,"score_spread":0.2246783923823212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2622216269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9120439,0.00038648778,0.06176272,0.00045844173,0.000023743665,0.00010054185,0.00019274851,0.00011983514,0.024911625],"genre_scores_gemma":[0.9943184,0.00015436194,0.0042762114,0.000012091126,0.0000066454504,0.000035850768,0.000043572185,0.000005642605,0.0011473263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992478,0.00030595931,0.00003081475,0.000067851724,0.0001633513,0.0001842362],"domain_scores_gemma":[0.99804306,0.0011488355,0.00033944965,0.00009431796,0.00027704434,0.00009724458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014526878,0.00050540525,0.00032134706,0.0009115617,0.00025876815,0.0013444293,0.0007296174,0.0007257451,0.002550187],"category_scores_gemma":[0.0026443666,0.00021421042,0.0005613137,0.0009765718,0.0004556839,0.00089508115,0.000616479,0.00050699804,0.00034431068],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000891807,0.00022855069,0.017310057,0.00008686926,0.000050468323,0.00016792271,0.00026724412,0.9524379,0.0014322287,0.011271487,0.00030546854,0.01635261],"study_design_scores_gemma":[0.00000702087,0.00020718572,0.0065632123,0.000022619619,0.000027680011,0.000018914834,0.000251309,0.9884162,0.00042314647,0.0034540968,0.00059878844,0.000009799271],"about_ca_topic_score_codex":0.009119099,"about_ca_topic_score_gemma":0.005470055,"teacher_disagreement_score":0.009119099,"about_ca_system_score_codex":0.0015971861,"about_ca_system_score_gemma":0.0012867814,"threshold_uncertainty_score":0.018132031},"labels":[],"label_agreement":null},{"id":"W2622382054","doi":"10.5267/j.jpm.2017.6.001","title":"A state-of-art survey on project selection using MCDM techniques","year":2017,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Smart Systems and Machine Learning","field":"Computer Science","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Multiple-criteria decision analysis; Selection (genetic algorithm); State (computer science); Management science; Computer science; Operations research; Mathematics; Engineering; Artificial intelligence; Algorithm","score_opus":0.05556688438780359,"score_gpt":0.3546439488345673,"score_spread":0.2990770644467637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2622382054","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.097838774,0.6819851,0.1359438,0.006398925,0.0007072053,0.0003736647,0.0017402802,0.00032809444,0.07468428],"genre_scores_gemma":[0.25607982,0.64973456,0.08439796,0.0018071361,0.0005274574,0.00028865397,0.0020665491,0.000108316395,0.004989541],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99058855,0.004114926,0.001007622,0.0007219303,0.0033308673,0.00023603656],"domain_scores_gemma":[0.9516188,0.039025627,0.0016096407,0.001341966,0.006124292,0.00027971173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010914876,0.0007423363,0.0012124019,0.009572348,0.00062589615,0.0020556648,0.0013027788,0.0010748652,0.006046551],"category_scores_gemma":[0.02431016,0.00050204113,0.0010244997,0.019294994,0.0006885483,0.002530737,0.00089592586,0.00065465947,0.0010077596],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012654232,0.00013137706,0.00890357,0.013509361,0.00016333992,0.000100780446,0.0010083942,0.0019699617,0.0014197439,0.0076247286,0.010700715,0.95434135],"study_design_scores_gemma":[0.000051353716,0.0008137933,0.06467077,0.028594496,0.0007842711,0.0022715952,0.011773344,0.010876565,0.006081928,0.013928922,0.8599787,0.00017425521],"about_ca_topic_score_codex":0.0023700262,"about_ca_topic_score_gemma":0.0042056995,"teacher_disagreement_score":0.010914876,"about_ca_system_score_codex":0.0012014987,"about_ca_system_score_gemma":0.0017703266,"threshold_uncertainty_score":0.05772406},"labels":[],"label_agreement":null},{"id":"W2624565589","doi":"10.5267/j.jpm.2017.5.003","title":"Integrated multi-resource planning and scheduling in engineering project","year":2017,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Scheduling (production processes); Computer science; Integrated business planning; Systems engineering; Engineering; Business; Operations management","score_opus":0.026144172098904638,"score_gpt":0.26953922366010247,"score_spread":0.24339505156119784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2624565589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06720319,0.0005241692,0.92932314,0.00009100801,0.000018464923,0.000091538204,0.000032818956,0.00017378571,0.002541934],"genre_scores_gemma":[0.6553413,0.00038698906,0.34276,0.000034131037,0.000018527528,0.00020536494,0.00010662609,0.000056291836,0.0010907712],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99807584,0.00090461853,0.00006212495,0.00019647062,0.00055499724,0.0002059566],"domain_scores_gemma":[0.99896,0.00061290426,0.0001240827,0.00007705476,0.00014901445,0.000077009805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018282005,0.00065516034,0.0010104356,0.0011066651,0.000550945,0.0010375872,0.0006744032,0.00052199664,0.0011386328],"category_scores_gemma":[0.0026559115,0.00081327045,0.00071485597,0.0015936678,0.00053604564,0.0013023478,0.0009034872,0.0008440687,0.00015463475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011685078,0.00007672848,0.00071155425,0.000052971616,0.00003700576,0.00003512618,0.000045818462,0.9340178,0.0018353972,0.0049342047,0.00018326004,0.057953287],"study_design_scores_gemma":[0.000010919937,0.00006766561,0.00025865046,0.000005811865,0.000014442043,0.000008976217,0.000013891134,0.9960498,0.00077190046,0.0024598087,0.00033273923,0.0000053728104],"about_ca_topic_score_codex":0.007925754,"about_ca_topic_score_gemma":0.008466508,"teacher_disagreement_score":0.007925754,"about_ca_system_score_codex":0.00090286846,"about_ca_system_score_gemma":0.0021404414,"threshold_uncertainty_score":0.01575923},"labels":[],"label_agreement":null},{"id":"W2777455068","doi":"10.5267/j.jpm.2017.12.001","title":"A structural equation modeling approach to examine the relationship between complexity factors of a project and the merits of project manager","year":2017,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Structural equation modeling; Computer science; Process management; Project management; Management science; Engineering; Systems engineering","score_opus":0.5495789333624785,"score_gpt":0.44106866880290424,"score_spread":0.1085102645595743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2777455068","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64320916,0.0016347136,0.3234634,0.0050298227,0.00045948965,0.005266965,0.0036419933,0.00046217736,0.016832294],"genre_scores_gemma":[0.8634138,0.0012967191,0.12091163,0.00031528054,0.00010758707,0.008287388,0.0020779395,0.000041746538,0.0035479772],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9916967,0.0058336235,0.0004513439,0.0006753612,0.00085745845,0.00048551348],"domain_scores_gemma":[0.9797846,0.016440593,0.0018677867,0.00031060548,0.0012251224,0.00037133845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008069046,0.0019700017,0.0014367589,0.0074376324,0.0019527291,0.0022128199,0.0022190877,0.0019065775,0.008759694],"category_scores_gemma":[0.01970901,0.0008600516,0.0029654854,0.0068689543,0.0012846196,0.003065503,0.0025892968,0.003518719,0.0007727281],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00086330523,0.006787508,0.61654156,0.0025828907,0.003936938,0.0013703005,0.026621176,0.065106206,0.0027432225,0.13749965,0.008872234,0.12707499],"study_design_scores_gemma":[0.00062426535,0.006607534,0.1724333,0.002083177,0.0026246984,0.00086247013,0.025686298,0.68851995,0.0019331445,0.074595,0.023624111,0.00040606654],"about_ca_topic_score_codex":0.01530611,"about_ca_topic_score_gemma":0.014387109,"teacher_disagreement_score":0.01530611,"about_ca_system_score_codex":0.0041420795,"about_ca_system_score_gemma":0.006328103,"threshold_uncertainty_score":0.042673767},"labels":[],"label_agreement":null},{"id":"W2777524582","doi":"10.5267/j.jpm.2017.10.001","title":"Scheduling of multi load AGVs in FMS by modified memetic particle swarm optimization algorithm","year":2017,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Memetic algorithm; Mathematical optimization; Multi-swarm optimization; Scheduling (production processes); Job shop scheduling; Computer science; Metaheuristic; Swarm behaviour; Local search (optimization); Algorithm; Mathematics; Schedule","score_opus":0.025665671767753157,"score_gpt":0.27924672691182795,"score_spread":0.2535810551440748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2777524582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07967425,0.00031887085,0.9121954,0.000251747,0.000096270785,0.000110037094,0.00005095957,0.0002353701,0.007067022],"genre_scores_gemma":[0.8672322,0.00018322622,0.12797397,0.000078437595,0.000041293995,0.00024249284,0.000077494944,0.00002838652,0.0041425405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980885,0.000059360886,0.000009905452,0.000034929628,0.000049740553,0.00003735043],"domain_scores_gemma":[0.9998087,0.0000910271,0.000036589317,0.0000128571355,0.000035866153,0.000014904258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048450025,0.00050631777,0.0007148808,0.00042529978,0.000378174,0.0006206884,0.00079555594,0.000818583,0.0010084204],"category_scores_gemma":[0.0007007395,0.00033727518,0.000573274,0.00041863965,0.00034410163,0.0003625918,0.00045168507,0.00040337385,0.0001314108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046108325,0.000028618175,0.00031941093,0.000031040894,0.000029549994,0.000058332207,0.000029010245,0.98116827,0.0017522885,0.0019770039,0.00048360182,0.01407669],"study_design_scores_gemma":[0.000008733048,0.000018769479,0.000054097225,0.0000013738992,0.0000031056136,0.000005082747,0.0000048229754,0.99917585,0.00017153051,0.00038827152,0.0001668075,0.0000014289616],"about_ca_topic_score_codex":0.005082742,"about_ca_topic_score_gemma":0.0031352756,"teacher_disagreement_score":0.005082742,"about_ca_system_score_codex":0.00044708417,"about_ca_system_score_gemma":0.0008187235,"threshold_uncertainty_score":0.010106325},"labels":[],"label_agreement":null},{"id":"W2783792461","doi":"10.5267/j.jpm.2018.1.002","title":"The advantage of project risk management tools","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"New York Institute of Technology","funders":"","keywords":"Risk management; Risk analysis (engineering); Business; Computer science","score_opus":0.08492063532599971,"score_gpt":0.4024880177353785,"score_spread":0.3175673824093788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783792461","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07142013,0.008258245,0.8242533,0.0055941106,0.00055464887,0.0008726135,0.0009180659,0.0055806558,0.08254831],"genre_scores_gemma":[0.453964,0.0051346463,0.52730334,0.00074730825,0.00066866307,0.00082334504,0.0008023061,0.00047680578,0.0100795785],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97675055,0.01079648,0.00196038,0.0010009528,0.009056427,0.000435244],"domain_scores_gemma":[0.9222744,0.049306937,0.009721043,0.00936806,0.007874161,0.0014553806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013549926,0.0015959152,0.00080510596,0.006467876,0.0005362378,0.0042823628,0.0017056293,0.0010746609,0.00722881],"category_scores_gemma":[0.059792347,0.00054727163,0.0010888516,0.0039098677,0.0007617761,0.007217298,0.0036007105,0.0019725873,0.0023929214],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021820984,0.00039876223,0.013427785,0.0018058447,0.00018205775,0.00031232816,0.002363024,0.0034720378,0.0038983652,0.035215832,0.010079202,0.9286266],"study_design_scores_gemma":[0.00044742762,0.0034197199,0.10888696,0.011032753,0.0010803927,0.0122002335,0.0066487193,0.05099444,0.019853132,0.24039103,0.5441104,0.00093484146],"about_ca_topic_score_codex":0.00035715665,"about_ca_topic_score_gemma":0.00036008077,"teacher_disagreement_score":0.013549926,"about_ca_system_score_codex":0.00056136795,"about_ca_system_score_gemma":0.0015667045,"threshold_uncertainty_score":0.071659684},"labels":[],"label_agreement":null},{"id":"W2791276804","doi":"10.5267/j.jpm.2018.2.003","title":"A hybrid of QFD and AHP-TOPSIS for Durg dumping waste projects","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Quality Function Deployment in Product Design","field":"Business, Management and Accounting","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; TOPSIS; Quality function deployment; Dumping; Business; Computer science; Operations research; Engineering; Operations management","score_opus":0.05184100895421905,"score_gpt":0.279876925386458,"score_spread":0.22803591643223892,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791276804","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11934766,0.00019520063,0.87267095,0.00031658926,0.000053928834,0.00080496236,0.00034017648,0.0009096083,0.0053609633],"genre_scores_gemma":[0.37204984,0.00019243878,0.62568873,0.000038925325,0.000008469333,0.0005593586,0.00024376123,0.000035513465,0.0011830499],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846786,0.00064946164,0.00014246181,0.00014287612,0.0004735571,0.00012365439],"domain_scores_gemma":[0.998928,0.0005876315,0.00007862853,0.000051264447,0.0003160063,0.000038383983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029987365,0.00082597695,0.0008558432,0.00221248,0.0010265841,0.0015247022,0.001005572,0.00075591076,0.0026169368],"category_scores_gemma":[0.0028768925,0.00071376545,0.001359123,0.0022452672,0.0003885894,0.000991958,0.0012097256,0.00058301224,0.00028824125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041521605,0.0006289301,0.006834718,0.001027576,0.00026522327,0.00062228885,0.0013460963,0.5446687,0.017485945,0.008462873,0.0014923776,0.41674998],"study_design_scores_gemma":[0.000041828458,0.00021134362,0.0014383493,0.000043341224,0.000052208343,0.000053969125,0.0005108632,0.9905799,0.0027268573,0.0022446502,0.002061187,0.000035526413],"about_ca_topic_score_codex":0.017888697,"about_ca_topic_score_gemma":0.01735777,"teacher_disagreement_score":0.017888697,"about_ca_system_score_codex":0.0013693046,"about_ca_system_score_gemma":0.0025472546,"threshold_uncertainty_score":0.03556913},"labels":[],"label_agreement":null},{"id":"W2794271554","doi":"10.5267/j.jpm.2018.2.002","title":"Downward-sloping linear supply function equilibrium in duopoly","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Merger and Competition Analysis","field":"Economics, Econometrics and Finance","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Duopoly; Function (biology); Supply; Economics; Mathematics; Microeconomics; Cournot competition","score_opus":0.03380776729644635,"score_gpt":0.2564383288184161,"score_spread":0.22263056152196975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794271554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6970308,0.00086993707,0.24519673,0.00086360355,0.000027531036,0.00008840956,0.00033026456,0.00030424524,0.055288553],"genre_scores_gemma":[0.99133885,0.00023503383,0.0056551397,0.00006291514,0.000011315587,0.000032933043,0.000061515355,0.000026131236,0.0025761821],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9989531,0.00045047404,0.00003513852,0.00019594094,0.00010632196,0.0002589814],"domain_scores_gemma":[0.99755305,0.0012947724,0.000568003,0.00012926887,0.0002786868,0.00017628679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001497943,0.0004351081,0.0010215086,0.0011542691,0.0007304345,0.0027321358,0.0007428822,0.0008421571,0.0063189557],"category_scores_gemma":[0.007548523,0.0005433653,0.00086512655,0.0009223546,0.0016999559,0.0020768365,0.001118166,0.0008886132,0.0007327442],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003664261,0.00011051122,0.008243331,0.00026886413,0.00013508131,0.001721904,0.0008683142,0.2212308,0.0071322084,0.7395066,0.0029819354,0.01743398],"study_design_scores_gemma":[0.000070084345,0.00014919945,0.0045284866,0.000066741275,0.000032256587,0.00060190953,0.0006613164,0.50308776,0.0010712391,0.48664838,0.0029968144,0.00008576028],"about_ca_topic_score_codex":0.00658867,"about_ca_topic_score_gemma":0.003419776,"teacher_disagreement_score":0.00658867,"about_ca_system_score_codex":0.0011424659,"about_ca_system_score_gemma":0.00055073993,"threshold_uncertainty_score":0.021139026},"labels":[],"label_agreement":null},{"id":"W2799546361","doi":"10.5267/j.jpm.2018.4.003","title":"Performance evaluation of project management system based on combination of EFQM and QFD","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Quality Function Deployment in Product Design","field":"Business, Management and Accounting","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Quality function deployment; Quality management; Computer science; Business; Engineering; Operations management; Management system","score_opus":0.059217180432362994,"score_gpt":0.29544933402161444,"score_spread":0.23623215358925145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2799546361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9612572,0.00023107391,0.02686831,0.00021685577,0.000027985916,0.00031561716,0.00018821037,0.00022190523,0.010672839],"genre_scores_gemma":[0.9851189,0.0000738114,0.013850347,0.000010692552,0.0000072717767,0.00008112877,0.000120428376,0.000009256182,0.0007281555],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.990859,0.0048085917,0.00063729763,0.0005221051,0.0027698977,0.00040319632],"domain_scores_gemma":[0.98568267,0.0061046137,0.0017618464,0.00069112907,0.0051395264,0.00062015426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009379378,0.0004598877,0.0003610711,0.0029070696,0.0005001208,0.0013160594,0.00035678488,0.0003414514,0.0016109854],"category_scores_gemma":[0.015925093,0.00013756304,0.00028934426,0.0018832101,0.00029075012,0.0012157868,0.0008286344,0.00022788269,0.00025723735],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011927298,0.0016619739,0.29342607,0.00088637753,0.00019445298,0.00018854077,0.0036939974,0.029807983,0.018114239,0.0043738643,0.0031901302,0.6432697],"study_design_scores_gemma":[0.00022326945,0.011606736,0.6767397,0.00034363373,0.00028560898,0.0004593638,0.008287006,0.2496414,0.03768991,0.0025823093,0.011933215,0.00020779805],"about_ca_topic_score_codex":0.0022714238,"about_ca_topic_score_gemma":0.0015687915,"teacher_disagreement_score":0.009379378,"about_ca_system_score_codex":0.0013309048,"about_ca_system_score_gemma":0.001204529,"threshold_uncertainty_score":0.049603462},"labels":[],"label_agreement":null},{"id":"W2801250026","doi":"10.5267/j.jpm.2018.3.002","title":"Application of TODIM (TOmada de Decisao Interativa Multicriterio) method for under-construction housing project selection in Kolkata","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.08777635587664524,"score_gpt":0.450878490566434,"score_spread":0.36310213468978875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801250026","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3257854,0.00048319047,0.657011,0.00039144757,0.00008162965,0.00084122294,0.0012351604,0.0005887978,0.013582161],"genre_scores_gemma":[0.56798613,0.00018575015,0.42915413,0.00005321688,0.000010054829,0.00045362546,0.00058482215,0.00005010748,0.0015221622],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9966634,0.0017052311,0.000271899,0.0004325948,0.0005518522,0.00037504034],"domain_scores_gemma":[0.9968928,0.0019203947,0.0003683972,0.00014604432,0.00054066844,0.00013158128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00436933,0.0009810097,0.0012836654,0.004451743,0.0009976127,0.0023731627,0.0010904092,0.0007158724,0.002948866],"category_scores_gemma":[0.007746464,0.00041759852,0.0014410259,0.0032331327,0.0004817971,0.0005849562,0.002316425,0.0007582877,0.00022049554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00080100045,0.00038500674,0.05770609,0.0011325203,0.00044875464,0.0011966677,0.0021361446,0.36974576,0.0075670066,0.01983505,0.0038041316,0.5352419],"study_design_scores_gemma":[0.000084838895,0.00034406007,0.013361698,0.00016523594,0.00015720379,0.0004192041,0.0027577342,0.9532821,0.0066524013,0.01342349,0.009232009,0.000120166886],"about_ca_topic_score_codex":0.010909312,"about_ca_topic_score_gemma":0.017455073,"teacher_disagreement_score":0.010909312,"about_ca_system_score_codex":0.0026052014,"about_ca_system_score_gemma":0.0029346587,"threshold_uncertainty_score":0.023107529},"labels":[],"label_agreement":null},{"id":"W2885306679","doi":"10.5267/j.jpm.2018.8.001","title":"The scheduling of automatic guided vehicles for the workload balancing and travel time minimi-zation in the flexible manufacturing system by the nature-inspired algorithm","year":2018,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workload; Scheduling (production processes); Flexible manufacturing system; Computer science; Job shop scheduling; Automated guided vehicle; Real-time computing; Dynamic priority scheduling; Rate-monotonic scheduling; Engineering; Schedule; Operations management; Artificial intelligence","score_opus":0.010353076346807977,"score_gpt":0.2529922495330925,"score_spread":0.24263917318628453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2885306679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1758128,0.00035274553,0.8185894,0.00022135576,0.000048439622,0.000089515335,0.000045687622,0.0001944,0.004645594],"genre_scores_gemma":[0.8749691,0.0001822792,0.12233325,0.000050637867,0.000018309047,0.00013564443,0.00007814545,0.00003599018,0.0021965713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998542,0.0000416887,0.000005733894,0.000025517353,0.000040017298,0.00003281966],"domain_scores_gemma":[0.9998523,0.00007852654,0.000026539949,0.0000061946407,0.000022861264,0.000013528443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003498736,0.00047635878,0.0005035743,0.00036177246,0.0003211618,0.00044644257,0.00050873787,0.000505832,0.00077598676],"category_scores_gemma":[0.00064095715,0.0002337533,0.00047699644,0.00044810647,0.00032910125,0.00031910228,0.0003573368,0.00035151298,0.00006922269],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003194816,0.000023205617,0.00031041578,0.000028129589,0.000016762635,0.000032052656,0.000029711502,0.9809059,0.0019908298,0.0018114018,0.00028408333,0.014535624],"study_design_scores_gemma":[0.0000045894326,0.000019525365,0.00007803899,0.0000014539405,0.0000023086602,0.000004911038,0.0000052712426,0.99898547,0.00027074554,0.00049402047,0.0001322831,0.0000013050526],"about_ca_topic_score_codex":0.0054664663,"about_ca_topic_score_gemma":0.0035630118,"teacher_disagreement_score":0.0054664663,"about_ca_system_score_codex":0.0006538648,"about_ca_system_score_gemma":0.001122478,"threshold_uncertainty_score":0.010869265},"labels":[],"label_agreement":null},{"id":"W2911673122","doi":"10.5267/j.jpm.2018.11.001","title":"Fuzzy inference system-Latin hypercube simulation: An integrated hybrid model for OHS risks management","year":2019,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Latin hypercube sampling; Computer science; Hypercube; Fuzzy logic; Inference; Fuzzy inference; Fuzzy inference system; Adaptive neuro fuzzy inference system; Artificial intelligence; Fuzzy control system; Parallel computing; Mathematics; Monte Carlo method","score_opus":0.19039837065178308,"score_gpt":0.43261287126393994,"score_spread":0.24221450061215685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911673122","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044260953,0.00026763327,0.9502085,0.00015446675,0.00004260116,0.00012328594,0.00010498245,0.00025059283,0.0045869346],"genre_scores_gemma":[0.8904539,0.00032889636,0.10383505,0.00008357415,0.000031732547,0.0006757206,0.00016056087,0.00004238548,0.004388109],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990569,0.0005673319,0.000034363577,0.00012049844,0.0001550257,0.00006586775],"domain_scores_gemma":[0.9988807,0.0007819499,0.00009651281,0.000039711278,0.00016378381,0.000037359554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012999468,0.000821753,0.001073767,0.00071853807,0.0006403441,0.0012987971,0.0010923175,0.0014855561,0.0029221685],"category_scores_gemma":[0.0025464455,0.00052896544,0.001062107,0.0008006831,0.0006622558,0.0009249758,0.0009563148,0.0009104516,0.0002735547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025828687,0.0000131803445,0.00021237234,0.000013044765,0.000020905978,0.000017956152,0.0000207403,0.9957359,0.00022342007,0.0017827982,0.000047258774,0.0018864954],"study_design_scores_gemma":[0.0000035979276,0.000011633664,0.00003238314,0.0000016587641,0.0000032751288,0.0000025800775,0.0000034981865,0.9991659,0.000060447306,0.00064439507,0.00006849238,0.0000023158454],"about_ca_topic_score_codex":0.011822326,"about_ca_topic_score_gemma":0.0059194528,"teacher_disagreement_score":0.011822326,"about_ca_system_score_codex":0.00089829665,"about_ca_system_score_gemma":0.0011337294,"threshold_uncertainty_score":0.023506999},"labels":[],"label_agreement":null},{"id":"W2912411243","doi":"10.5267/j.jpm.2019.1.001","title":"Project scheduling and forecasting by laws of physical movement","year":2019,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Operations research; Scheduling (production processes); Computer science; Law; Engineering; Political science; Operations management","score_opus":0.08027434343143473,"score_gpt":0.36578540992297953,"score_spread":0.2855110664915448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2912411243","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0091384705,0.0005625824,0.98171866,0.0003743638,0.00011768336,0.000072604336,0.0001865321,0.00022566554,0.0076034325],"genre_scores_gemma":[0.62704915,0.003912221,0.34887087,0.00020840668,0.00036785877,0.00078205287,0.00066290394,0.00021632604,0.017930262],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988537,0.00025583405,0.00006975223,0.00029952903,0.00044871762,0.00007256032],"domain_scores_gemma":[0.9981324,0.0011319476,0.0002885372,0.00013205159,0.00027142916,0.0000437163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001526968,0.0008323198,0.0007960462,0.0014008111,0.0005398438,0.001633145,0.0012794251,0.0009938981,0.0035075275],"category_scores_gemma":[0.006313413,0.0005800616,0.0010594502,0.0016052749,0.0012826248,0.0022255501,0.0005932152,0.0011967574,0.00077587034],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020986614,0.000029912655,0.0022343993,0.00011334776,0.000032883218,0.00007421139,0.00012618104,0.8612025,0.00074893265,0.098596476,0.0014428257,0.035377398],"study_design_scores_gemma":[0.0000071555482,0.000016241987,0.00061125465,0.000026468248,0.000009129577,0.00003430725,0.000023231873,0.95783305,0.00020442148,0.037952136,0.003267093,0.00001543535],"about_ca_topic_score_codex":0.015272169,"about_ca_topic_score_gemma":0.009239392,"teacher_disagreement_score":0.015272169,"about_ca_system_score_codex":0.0014982803,"about_ca_system_score_gemma":0.0012842721,"threshold_uncertainty_score":0.03036654},"labels":[],"label_agreement":null},{"id":"W2915060661","doi":"10.5267/j.jpm.2019.1.004","title":"A hybrid of Delphi, AHP and TOPSIS Methods for project portfolio management","year":2019,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"TOPSIS; Analytic hierarchy process; Project portfolio management; Delphi; Portfolio; Delphi method; Computer science; Operations research; Business; Operations management; Project management; Engineering; Systems engineering; Artificial intelligence","score_opus":0.1767051285849966,"score_gpt":0.520080189489326,"score_spread":0.3433750609043294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915060661","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0110925045,0.00048360185,0.98109907,0.00027300167,0.00006857625,0.0013906796,0.00012579215,0.0002513904,0.005215392],"genre_scores_gemma":[0.087599486,0.00059052295,0.9090273,0.000064470245,0.000023234157,0.0013239946,0.000114396345,0.000030837873,0.0012257281],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9873656,0.007711664,0.00086132647,0.0005222229,0.003246625,0.0002925852],"domain_scores_gemma":[0.994531,0.0037502483,0.00030814283,0.00019560747,0.0010860725,0.000128981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011269,0.0019824537,0.0016450313,0.0077269888,0.0016348688,0.0032472645,0.0012853068,0.0007993497,0.0036362994],"category_scores_gemma":[0.010206708,0.00084892317,0.0017719478,0.006292737,0.0009624413,0.0015789173,0.002269068,0.0013583202,0.0004854919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033573457,0.0005410495,0.002684139,0.004003431,0.0009675658,0.00050158246,0.0060359845,0.13681386,0.012033917,0.061651215,0.004196082,0.7702354],"study_design_scores_gemma":[0.00022387973,0.0011711501,0.0045412243,0.0013253175,0.000490805,0.00067628885,0.0055788723,0.81742126,0.008610369,0.126648,0.03293908,0.0003737918],"about_ca_topic_score_codex":0.0047361352,"about_ca_topic_score_gemma":0.007889591,"teacher_disagreement_score":0.011269,"about_ca_system_score_codex":0.0018094073,"about_ca_system_score_gemma":0.0036557156,"threshold_uncertainty_score":0.059596896},"labels":[],"label_agreement":null},{"id":"W2951346250","doi":"10.5267/j.jpm.2019.5.001","title":"Production lessening analysis of manufacturing unit in India: Lean Six Sigma perspective","year":2019,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Six Sigma; Perspective (graphical); Lean manufacturing; Lean Six Sigma; Unit (ring theory); Production (economics); Manufacturing engineering; Business; Engineering; Computer science; Mathematics; Economics","score_opus":0.024115853464254593,"score_gpt":0.2763572984432463,"score_spread":0.2522414449789917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2951346250","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9068415,0.0035966323,0.047909707,0.002084059,0.00005343638,0.0002617112,0.00069999153,0.0003177418,0.03823518],"genre_scores_gemma":[0.98113465,0.0012300569,0.013380211,0.00006357612,0.0000064687533,0.000027970063,0.00030847825,0.000015462438,0.0038330867],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99908495,0.00017330828,0.00006870047,0.00007609717,0.00042268925,0.00017418782],"domain_scores_gemma":[0.9986986,0.00037999134,0.00026985537,0.000060011316,0.0005105887,0.00008089758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006404894,0.00036564266,0.0002071599,0.0033234195,0.0008367598,0.002190287,0.00068106723,0.00040016143,0.0016587798],"category_scores_gemma":[0.00096452236,0.00023094978,0.0005503023,0.003500643,0.0005459173,0.00064211304,0.00063239207,0.00043377143,0.0002105889],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005926036,0.0006540375,0.20206946,0.0034813224,0.00031344616,0.0070538106,0.010203999,0.20178138,0.044574913,0.046867106,0.007486584,0.47492146],"study_design_scores_gemma":[0.00005989708,0.002328782,0.45005733,0.0017407539,0.0005049243,0.0037011702,0.04310047,0.32356644,0.0819144,0.023387665,0.06931124,0.0003269467],"about_ca_topic_score_codex":0.018020634,"about_ca_topic_score_gemma":0.024241462,"teacher_disagreement_score":0.018020634,"about_ca_system_score_codex":0.0033817338,"about_ca_system_score_gemma":0.0033293464,"threshold_uncertainty_score":0.03583145},"labels":[],"label_agreement":null},{"id":"W2970946029","doi":"10.5267/j.jpm.2019.8.001","title":"Using a metaheuristic algorithm for solving a home health care routing and scheduling problem","year":2019,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Metaheuristic; Computer science; Vehicle routing problem; Scheduling (production processes); Mathematical optimization; Home health; Health care; Routing (electronic design automation); Algorithm; Mathematics; Computer network; Economics","score_opus":0.020327871307704817,"score_gpt":0.28387149896608843,"score_spread":0.26354362765838363,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970946029","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038380187,0.000757753,0.9500779,0.00050386216,0.00012815796,0.00020060847,0.00016236662,0.00045104293,0.009338139],"genre_scores_gemma":[0.3079539,0.0007089636,0.6862066,0.00022546625,0.00009764369,0.0006050004,0.0003771196,0.000085444895,0.003739881],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996049,0.0001801225,0.0000201993,0.00006455428,0.00007106764,0.00005922778],"domain_scores_gemma":[0.9995072,0.00032894127,0.000052244137,0.000025118723,0.000061578365,0.000024929192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075546355,0.001084405,0.00093871105,0.0010643207,0.0005794551,0.00096651027,0.0009588658,0.0016650836,0.0019954797],"category_scores_gemma":[0.0015057449,0.0004746226,0.0014168695,0.0013820344,0.0004507547,0.00058327295,0.00070520496,0.0010530289,0.00025725208],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039139144,0.000074063755,0.00036819233,0.0000755282,0.000059958234,0.00007169133,0.00003131681,0.9664952,0.0007874465,0.0055364855,0.00092827197,0.025532758],"study_design_scores_gemma":[0.000016695823,0.000029609482,0.00006187995,0.000007930368,0.000012125393,0.000018705,0.000013113053,0.9972734,0.00022955282,0.0017216807,0.00061172934,0.000003573277],"about_ca_topic_score_codex":0.007233805,"about_ca_topic_score_gemma":0.005835303,"teacher_disagreement_score":0.007233805,"about_ca_system_score_codex":0.0008169584,"about_ca_system_score_gemma":0.0019202816,"threshold_uncertainty_score":0.014383376},"labels":[],"label_agreement":null},{"id":"W3003378510","doi":"10.5267/j.jpm.2020.1.002","title":"A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Douglas College","funders":"","keywords":"Computer science; Genetic algorithm; Mathematical optimization; Scheduling (production processes); Distributed computing; Mathematics; Machine learning","score_opus":0.1224594599562345,"score_gpt":0.39909491086921617,"score_spread":0.2766354509129817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003378510","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01058849,0.00026165857,0.9863434,0.00010708175,0.00003369056,0.000053125408,0.00002445677,0.00015101481,0.002437137],"genre_scores_gemma":[0.41639248,0.0006200977,0.5789941,0.00015138506,0.000051873765,0.0005771128,0.00015063731,0.00007269418,0.0029895979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967337,0.00013734905,0.000013091091,0.000048276997,0.00008985504,0.000038066468],"domain_scores_gemma":[0.9995697,0.00028904446,0.000036000805,0.000012328701,0.00007562753,0.000017260892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007264567,0.0008674283,0.0010389097,0.000796968,0.0005385012,0.00067981734,0.0010303191,0.0013765162,0.0015646406],"category_scores_gemma":[0.0013507619,0.0004268739,0.0008430876,0.0011549405,0.0004932092,0.00059052074,0.000615091,0.0009395731,0.0001855241],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015821983,0.000020872078,0.00019340804,0.000030975163,0.000023900191,0.0000380525,0.000023467777,0.97693515,0.00058027945,0.002604852,0.00026438467,0.019268807],"study_design_scores_gemma":[0.000006582642,0.00001419217,0.0000383862,0.0000044454832,0.000004852514,0.000010674792,0.0000046579376,0.99886465,0.00008927978,0.0007526796,0.000206889,0.0000027379392],"about_ca_topic_score_codex":0.0134119615,"about_ca_topic_score_gemma":0.009101115,"teacher_disagreement_score":0.0134119615,"about_ca_system_score_codex":0.00072538067,"about_ca_system_score_gemma":0.0019965845,"threshold_uncertainty_score":0.026667833},"labels":[],"label_agreement":null},{"id":"W3034346944","doi":"10.5267/j.jpm.2020.5.001","title":"Risk management and risk management performance measurement in the construction projects of Finland","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk management; Business; Risk analysis (engineering); Environmental resource management; Environmental planning; Geography; Environmental science; Finance","score_opus":0.09368439526529154,"score_gpt":0.31116984319749985,"score_spread":0.2174854479322083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034346944","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9925122,0.00032877657,0.003011497,0.00019663267,0.0000047548706,0.000100689365,0.000045590696,0.0000069639905,0.0037929188],"genre_scores_gemma":[0.99748564,0.00017913604,0.0018390324,0.000007500314,0.0000024291646,0.000056617962,0.000023900458,0.0000025762545,0.0004032645],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9886825,0.005795238,0.0009312801,0.00066069205,0.0031007314,0.0008294842],"domain_scores_gemma":[0.98132974,0.011144138,0.004451711,0.00071110943,0.0017195692,0.0006437493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011132192,0.00055853213,0.00040960708,0.0024610257,0.0023639796,0.0041397926,0.000735351,0.0009855058,0.0012024106],"category_scores_gemma":[0.02228949,0.00041628056,0.0004448408,0.0029613783,0.002496361,0.002176286,0.0040505505,0.0007543191,0.00016080245],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005713963,0.0007198179,0.57893056,0.0012144106,0.00020015861,0.0043925173,0.17703158,0.029902993,0.006749886,0.018155094,0.0010784034,0.18105328],"study_design_scores_gemma":[0.000034242395,0.0010803303,0.76703334,0.00084490376,0.00012238385,0.0015725798,0.18294063,0.019262008,0.0041934624,0.009445522,0.0132557815,0.00021480203],"about_ca_topic_score_codex":0.004744718,"about_ca_topic_score_gemma":0.0052701733,"teacher_disagreement_score":0.011132192,"about_ca_system_score_codex":0.00454816,"about_ca_system_score_gemma":0.0062812734,"threshold_uncertainty_score":0.058873355},"labels":[],"label_agreement":null},{"id":"W3095605306","doi":"10.5267/j.jpm.2020.10.003","title":"A hybrid mathematical programming model and statistical approach for bidding price decision in construction projects","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bidding; Computer science; Robustness (evolution); Profit (economics); Operations research; Mathematical optimization; Key (lock); Realization (probability); Competitor analysis; Order (exchange); Economics; Engineering; Mathematics; Microeconomics; Finance","score_opus":0.1268575664002311,"score_gpt":0.37375400401749787,"score_spread":0.24689643761726676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3095605306","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062115714,0.0002018932,0.99058974,0.00019521915,0.000018146438,0.000044057448,0.00005956165,0.000065200795,0.0026146714],"genre_scores_gemma":[0.7413673,0.001605216,0.24838789,0.00021828782,0.00012900715,0.0010457869,0.0003594461,0.000095642135,0.006791525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982705,0.00080791407,0.00008590475,0.00023296858,0.00046672765,0.00013589182],"domain_scores_gemma":[0.9980342,0.0013787082,0.00022392934,0.00004302864,0.00027773366,0.000042499167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002389602,0.0012685879,0.0012048853,0.0013998456,0.0005251752,0.0021669855,0.0019041881,0.001477862,0.0020169972],"category_scores_gemma":[0.0042986535,0.00096249906,0.001522109,0.0017746312,0.0008300522,0.0018915434,0.0011309282,0.0016745189,0.00037076973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000096220965,0.000020157733,0.00024186983,0.000034845423,0.000016608867,0.00004641678,0.000021616708,0.9800744,0.00024343465,0.014581055,0.00016099501,0.004548971],"study_design_scores_gemma":[0.0000016842463,0.000010209416,0.000040308347,0.0000029122873,0.0000034144796,0.000008523652,0.000004342794,0.99701655,0.000054145872,0.0027054986,0.00014839004,0.000003981476],"about_ca_topic_score_codex":0.0072940895,"about_ca_topic_score_gemma":0.0049794335,"teacher_disagreement_score":0.0072940895,"about_ca_system_score_codex":0.0015349407,"about_ca_system_score_gemma":0.002408144,"threshold_uncertainty_score":0.014503241},"labels":[],"label_agreement":null},{"id":"W3096341430","doi":"10.5267/j.jpm.2020.9.001","title":"Financial ratios in energy projects: The case of days sales of inventory","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Deanship of Scientific Research, Prince Sattam bin Abdulaziz University; Prince Sattam bin Abdulaziz University","keywords":"Business; Audit; Rank (graph theory); Inventory management; Value (mathematics); Finance; Inventory turnover; Accounting; Operations management; Economics; Statistics; Mathematics","score_opus":0.03363820322068581,"score_gpt":0.22769574998665276,"score_spread":0.19405754676596695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096341430","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9856769,0.001425916,0.000993651,0.0005903675,0.000031738615,0.000026754518,0.0006933928,0.00001225528,0.010548942],"genre_scores_gemma":[0.9985801,0.00025767903,0.00031068924,0.000014158972,0.00003632763,0.000009652992,0.00022880273,0.000002857035,0.0005597184],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99760604,0.0008442145,0.00024480265,0.00020654853,0.0006730479,0.00042547044],"domain_scores_gemma":[0.9812664,0.008679409,0.0069730063,0.00033572648,0.001731098,0.0010142787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002935274,0.0003825141,0.00040868274,0.0048834495,0.00051595666,0.0029090438,0.0006285818,0.0007947451,0.003306138],"category_scores_gemma":[0.013343805,0.00017378574,0.00056336116,0.0047155954,0.0007777105,0.0022343644,0.0010612028,0.0012583523,0.0004161754],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014570539,0.00011392308,0.9674283,0.000108540415,0.00009065293,0.0025479794,0.0009881614,0.0052035023,0.00024888452,0.006257604,0.0009735686,0.015893072],"study_design_scores_gemma":[0.000007403166,0.00027354204,0.9585954,0.0001622983,0.00006255093,0.0026077493,0.0076293694,0.022494972,0.0004942141,0.003296828,0.0043193325,0.00005634312],"about_ca_topic_score_codex":0.0084075695,"about_ca_topic_score_gemma":0.0058253007,"teacher_disagreement_score":0.0084075695,"about_ca_system_score_codex":0.0014052839,"about_ca_system_score_gemma":0.00069826667,"threshold_uncertainty_score":0.016717255},"labels":[],"label_agreement":null},{"id":"W3096865007","doi":"10.5267/j.jpm.2020.10.002","title":"Value for money factors in Indian public-private partnership road projects: An exploratory approach","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"General partnership; Value for money; Exploratory factor analysis; Public–private partnership; Government (linguistics); Business; Index (typography); Private sector; Exploratory research; Perception; Value (mathematics); Public sector; Marketing; Finance; Public economics; Economics; Economic growth; Computer science; Psychology","score_opus":0.1354035542863812,"score_gpt":0.298773772712497,"score_spread":0.1633702184261158,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096865007","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9978898,0.000029453791,0.00039227743,0.000058290374,0.0000012499044,0.00013763682,0.00003816529,0.0000020412954,0.0014510779],"genre_scores_gemma":[0.99777114,0.00011702719,0.0012920239,0.000021097232,0.000003666499,0.00020764378,0.000043247655,0.0000020562254,0.0005421316],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99716717,0.0016988065,0.00011442698,0.0001434902,0.00044326964,0.00043276456],"domain_scores_gemma":[0.99312496,0.0044320617,0.0009859663,0.00025051108,0.00079756865,0.0004088531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032263938,0.00037377139,0.00041449745,0.0031671321,0.001760391,0.0022741442,0.000563577,0.0005041007,0.002593402],"category_scores_gemma":[0.006248343,0.00036491887,0.00063238695,0.0030812202,0.0015092489,0.0017999371,0.0024717941,0.0010938643,0.00017367973],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032715485,0.002803216,0.40060878,0.00084235135,0.00007736152,0.0030469594,0.5058603,0.0012493986,0.004595391,0.00794521,0.0008510133,0.071792744],"study_design_scores_gemma":[0.000009755438,0.00074867543,0.247424,0.00014351051,0.000035274705,0.0005123131,0.7439082,0.0021011578,0.0008762742,0.0013844668,0.0028180084,0.0000383322],"about_ca_topic_score_codex":0.0055687972,"about_ca_topic_score_gemma":0.0070719467,"teacher_disagreement_score":0.0055687972,"about_ca_system_score_codex":0.0021500417,"about_ca_system_score_gemma":0.002609275,"threshold_uncertainty_score":0.017063022},"labels":[],"label_agreement":null},{"id":"W3097072875","doi":"10.5267/j.jpm.2020.10.001","title":"Solving a flow shop scheduling problem with missing operations in an Industry 4.0 production environment","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Flow shop scheduling; Tardiness; Job shop scheduling; Computer science; Scheduling (production processes); Mathematical optimization; Permutation (music); Simulated annealing; Industrial engineering; Algorithm; Mathematics; Engineering; Routing (electronic design automation)","score_opus":0.02381794412213724,"score_gpt":0.23924523935885292,"score_spread":0.21542729523671567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097072875","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50950044,0.0005439777,0.4843108,0.00048168763,0.000118816744,0.0002281092,0.00025222552,0.00031746787,0.004246452],"genre_scores_gemma":[0.69967884,0.00039216504,0.29731435,0.00007548509,0.00006545438,0.0001898267,0.00040935306,0.0000710857,0.0018033787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932563,0.00027990984,0.00003288509,0.00011582984,0.00010259049,0.00014320573],"domain_scores_gemma":[0.997823,0.0017128235,0.00016973408,0.00006187604,0.00012802344,0.00010463228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016945766,0.0010202286,0.0011351202,0.00069932145,0.0007397541,0.000862683,0.0009528329,0.0016187116,0.0018145371],"category_scores_gemma":[0.0029237322,0.0005498614,0.001357927,0.00076125,0.00050189905,0.0008421029,0.0005244296,0.0011895496,0.00012914362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012080982,0.00015178806,0.0005365399,0.00016910331,0.00003316249,0.00025150657,0.000063472675,0.9781772,0.0023863497,0.001870627,0.00038407964,0.015855243],"study_design_scores_gemma":[0.000047039117,0.00018906537,0.00034442265,0.000010075551,0.000020757056,0.000071771035,0.000067539004,0.99476564,0.001595745,0.0023998267,0.00047816572,0.000010013955],"about_ca_topic_score_codex":0.0059534726,"about_ca_topic_score_gemma":0.0041253767,"teacher_disagreement_score":0.0059534726,"about_ca_system_score_codex":0.0007168292,"about_ca_system_score_gemma":0.0020478384,"threshold_uncertainty_score":0.011837602},"labels":[],"label_agreement":null},{"id":"W3097673155","doi":"10.5267/j.jpm.2020.9.002","title":"Competitive advantage to enhance internationalization and marketing performance woodcraft industry: A perspective of resource-based view theory","year":2020,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Global Trade and Competitiveness","field":"Business, Management and Accounting","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Internationalization; Competitive advantage; Business; Marketing; Competition (biology); Product (mathematics); Resource (disambiguation); Industrial organization; Marketing management; New product development; Resource-based view; Computer science; International trade","score_opus":0.015350790221054744,"score_gpt":0.265905273999886,"score_spread":0.25055448377883127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097673155","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18703666,0.004496578,0.02749035,0.012929758,0.00013777181,0.00012848886,0.000080780046,0.00003660375,0.76766306],"genre_scores_gemma":[0.99287766,0.0014725936,0.0023395391,0.00042186407,0.00005910648,0.000049741,0.000018449702,0.000007095528,0.0027540098],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99840015,0.0007980774,0.000036461017,0.00018153808,0.0003103475,0.00027338386],"domain_scores_gemma":[0.99704474,0.0017389106,0.00046352044,0.00009625258,0.0003221524,0.00033449355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001808888,0.00069131947,0.00037179617,0.0028025243,0.0013207959,0.0062863887,0.0007271435,0.001373246,0.0052795983],"category_scores_gemma":[0.0022365407,0.00018730902,0.0006363289,0.0016541162,0.0074394555,0.0048464444,0.002257481,0.0014930846,0.00030891478],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021057987,0.00016460955,0.0072510485,0.00017504307,0.00005055004,0.00035201196,0.0067945886,0.0008328894,0.00038035846,0.9675108,0.000953211,0.0155138895],"study_design_scores_gemma":[0.00006292725,0.0002682184,0.041926064,0.0006757192,0.00012902232,0.0005230709,0.021415146,0.009229471,0.000791917,0.8876925,0.03720813,0.00007775148],"about_ca_topic_score_codex":0.0035706328,"about_ca_topic_score_gemma":0.0025825126,"teacher_disagreement_score":0.0062863887,"about_ca_system_score_codex":0.003997027,"about_ca_system_score_gemma":0.0027042378,"threshold_uncertainty_score":0.02900058},"labels":[],"label_agreement":null},{"id":"W3129768783","doi":"10.5267/j.jpm.2021.1.002","title":"Identification, evaluation, and allotment of critical risk factors (CRFs) in real estate projects: India as a case study","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Context (archaeology); Critical success factor; Business; Real estate development; Property management; Identification (biology); Marketing; Finance; Engineering; Operations management; Geography","score_opus":0.12958245200471585,"score_gpt":0.46100016809268457,"score_spread":0.3314177160879687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129768783","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98499656,0.0002744032,0.005799481,0.00032687339,0.0000089662235,0.00031028842,0.000084101885,0.000026257814,0.008173106],"genre_scores_gemma":[0.992969,0.0003148734,0.005060913,0.000024377598,0.000005334628,0.000053874497,0.00004992218,0.00000464539,0.0015172209],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967765,0.001425637,0.00020316402,0.00016151989,0.00087449414,0.00055857934],"domain_scores_gemma":[0.992284,0.004070158,0.0011661572,0.00039438417,0.0014690865,0.0006161901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027735545,0.00049757335,0.0003295009,0.0031285402,0.0016910689,0.0027135734,0.00087270595,0.0010674039,0.0014672986],"category_scores_gemma":[0.004694799,0.00022825887,0.0007453031,0.002788983,0.0014876443,0.000931826,0.0018223494,0.0009216786,0.0001635854],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00082308357,0.004180984,0.45632407,0.0016311236,0.0002317371,0.045832448,0.071184166,0.04769751,0.009122386,0.035193857,0.0068210037,0.32095763],"study_design_scores_gemma":[0.00007216098,0.0028655862,0.48459494,0.00095794216,0.00039475755,0.01581645,0.32331002,0.10249308,0.01620022,0.011018341,0.041988585,0.00028790082],"about_ca_topic_score_codex":0.013395875,"about_ca_topic_score_gemma":0.018888194,"teacher_disagreement_score":0.013395875,"about_ca_system_score_codex":0.002803231,"about_ca_system_score_gemma":0.0036221102,"threshold_uncertainty_score":0.026635826},"labels":[],"label_agreement":null},{"id":"W3129787735","doi":"10.5267/j.jpm.2021.1.003","title":"An interpretive structural modeling approach to enablers of green supply chain management on construction projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Intuition; Incentive; Business; Appeal; Supply chain management; Supply chain; Knowledge management; Perspective (graphical); Process management; Marketing; Computer science; Economics; Political science","score_opus":0.07248651904617082,"score_gpt":0.3538489111057097,"score_spread":0.2813623920595389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129787735","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1978086,0.000494354,0.7242023,0.0036985485,0.000073082934,0.0008739553,0.0008734783,0.00018229111,0.071793415],"genre_scores_gemma":[0.85529816,0.00048966246,0.14065567,0.00009473364,0.000020622709,0.00082368637,0.00030919124,0.000023103212,0.0022852179],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99596953,0.003352636,0.00010104772,0.00016807087,0.00026974521,0.00013894394],"domain_scores_gemma":[0.9925478,0.0060736355,0.00059788674,0.0002891671,0.00040247163,0.00008901179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049066185,0.0008603451,0.0003763088,0.0035508568,0.0010952157,0.0031271412,0.0013009432,0.000948803,0.0035080977],"category_scores_gemma":[0.00913739,0.00039795975,0.00096992706,0.0028522983,0.0022391756,0.0023860536,0.002279156,0.0013297783,0.00019898286],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006608997,0.00025611534,0.020822924,0.0005509407,0.00017712671,0.0008020147,0.022955967,0.1585326,0.0014024209,0.7522203,0.0012068175,0.04100668],"study_design_scores_gemma":[0.000052777967,0.00029181407,0.011025352,0.0009934255,0.0001760239,0.00023144216,0.031458836,0.58317363,0.0010922363,0.34580323,0.02563182,0.000069406364],"about_ca_topic_score_codex":0.009021004,"about_ca_topic_score_gemma":0.01466154,"teacher_disagreement_score":0.009021004,"about_ca_system_score_codex":0.0037988166,"about_ca_system_score_gemma":0.004025689,"threshold_uncertainty_score":0.02756244},"labels":[],"label_agreement":null},{"id":"W3130025168","doi":"10.5267/j.jpm.2021.1.001","title":"Methods of multi-criteria evaluation of economic efficiency of investment projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Economic and Business Development Strategies","field":"Economics, Econometrics and Finance","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Investment (military); Context (archaeology); Relevance (law); Quality (philosophy); Business; Competition (biology); Production (economics); Risk analysis (engineering); Investment strategy; Sustainable development; Industrial organization; Control (management); Environmental economics; Economics; Finance; Microeconomics","score_opus":0.1977896967193876,"score_gpt":0.385595345323886,"score_spread":0.18780564860449842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130025168","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013056317,0.0005648026,0.98064774,0.00007363415,0.000026283149,0.0005736461,0.000107353786,0.000076621975,0.0048736343],"genre_scores_gemma":[0.27401662,0.00059861044,0.7216281,0.00002875068,0.000033505796,0.0021332828,0.00021540155,0.000059718124,0.0012860325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9810137,0.011601347,0.0011270106,0.0009899659,0.004801769,0.00046614095],"domain_scores_gemma":[0.9759412,0.017600546,0.002031251,0.0006695596,0.0034812074,0.0002762937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019683221,0.0022406976,0.001926026,0.00976097,0.00087602175,0.003546106,0.0020685222,0.0012624087,0.0031312914],"category_scores_gemma":[0.0313451,0.00059737294,0.0020998719,0.007008603,0.0013772328,0.0017957166,0.0020961342,0.0012773161,0.0002539861],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002662227,0.00033964065,0.0067210225,0.0017995269,0.000773027,0.0002120939,0.00086620054,0.5905027,0.0035855127,0.078431085,0.0013156357,0.31518736],"study_design_scores_gemma":[0.000043544467,0.00033414623,0.0039661494,0.0002598752,0.00012726632,0.00010442886,0.00036819532,0.95487225,0.0019050927,0.03498497,0.0029580444,0.00007609158],"about_ca_topic_score_codex":0.0024829828,"about_ca_topic_score_gemma":0.0024408533,"teacher_disagreement_score":0.019683221,"about_ca_system_score_codex":0.0028196778,"about_ca_system_score_gemma":0.0026067272,"threshold_uncertainty_score":0.104096115},"labels":[],"label_agreement":null},{"id":"W3132238482","doi":"10.5267/j.jpm.2021.2.001","title":"Linking entrepreneurial orientation to project success in construction projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Proactivity; Entrepreneurial orientation; Moderation; CLARITY; Structural equation modeling; Business; Knowledge management; Marketing; Entrepreneurship; Orientation (vector space); Psychology; Social psychology; Computer science; Mathematics; Statistics","score_opus":0.07990087972434413,"score_gpt":0.38837112759690845,"score_spread":0.30847024787256433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3132238482","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988574,0.000026722837,0.00016582852,0.00004174273,0.0000020650723,0.000010722537,0.000008615578,8.7545885e-7,0.00088611984],"genre_scores_gemma":[0.99969494,0.00003111356,0.000098313394,0.0000043993405,0.0000014231838,0.000006353619,0.000010139062,5.44189e-7,0.00015281732],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998324,0.00074274046,0.00012781315,0.00008136899,0.00044036348,0.00028372416],"domain_scores_gemma":[0.984908,0.0055863415,0.0048380233,0.00040689975,0.0011937148,0.0030670925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024295384,0.00013517529,0.00013083404,0.0006802654,0.00049090415,0.0011330098,0.00016651269,0.00023152675,0.001426592],"category_scores_gemma":[0.010480449,0.00013391058,0.00022358685,0.0005330139,0.0005481745,0.00035913236,0.0011038397,0.0006212797,0.00012277406],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040434785,0.00018391808,0.9890057,0.00001806988,0.000022870743,0.00013004335,0.0008234449,0.00019175607,0.00021301366,0.00020429389,0.0000678325,0.009098656],"study_design_scores_gemma":[0.0000031865977,0.00017258922,0.99582726,0.00002390035,0.000016343638,0.00013194415,0.002571073,0.00043301476,0.0001721559,0.00024245733,0.00039765218,0.000008400107],"about_ca_topic_score_codex":0.001255836,"about_ca_topic_score_gemma":0.0027823825,"teacher_disagreement_score":0.0024295384,"about_ca_system_score_codex":0.00043786713,"about_ca_system_score_gemma":0.0012876402,"threshold_uncertainty_score":0.012848794},"labels":[],"label_agreement":null},{"id":"W3133199608","doi":"10.5267/j.jpm.2020.12.001","title":"The impact of ODA in constructing road traffic infrastructure on Vietnam’s economic growth","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Fiscal Policy and Economic Growth","field":"Economics, Econometrics and Finance","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Gross domestic product; Foreign direct investment; Investment (military); Transport infrastructure; Road transport; Transportation infrastructure; Real gross domestic product; Economics; Business; Economic growth; Transport engineering; Macroeconomics; Engineering; Political science","score_opus":0.019910329344548273,"score_gpt":0.25679509357122665,"score_spread":0.23688476422667837,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133199608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9757111,0.0004241198,0.0005243737,0.0012769228,0.00002345349,0.000028053855,0.00029744577,0.0000100956895,0.021704271],"genre_scores_gemma":[0.998063,0.00038787036,0.0001360189,0.000027008968,0.0000057440843,0.0000070245496,0.00010943213,0.0000014449049,0.0012625055],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991253,0.00033483212,0.000030468222,0.000045736735,0.00015442113,0.00030917008],"domain_scores_gemma":[0.99672,0.0009313839,0.0007671646,0.000065980385,0.00087027065,0.0006451483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092990615,0.00021094117,0.00011590674,0.0007111904,0.0004329888,0.0010656589,0.00019749303,0.00018189268,0.0019667812],"category_scores_gemma":[0.0029959194,0.00008181502,0.00018494656,0.0007784995,0.00047431234,0.00061261124,0.0009802026,0.0006205693,0.00012549765],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002323526,0.00046067455,0.8678948,0.00027793483,0.0001493355,0.0020426116,0.002110475,0.030311232,0.0017008595,0.022782281,0.0034336739,0.068603694],"study_design_scores_gemma":[0.000021028218,0.00028490508,0.95210004,0.00013967708,0.0000875091,0.00027350208,0.008664178,0.019751463,0.001523476,0.0022151463,0.014915465,0.00002361222],"about_ca_topic_score_codex":0.06776053,"about_ca_topic_score_gemma":0.05767881,"teacher_disagreement_score":0.06776053,"about_ca_system_score_codex":0.0023470079,"about_ca_system_score_gemma":0.003296678,"threshold_uncertainty_score":0.13473225},"labels":[],"label_agreement":null},{"id":"W3152917775","doi":"10.5267/j.jpm.2021.3.001","title":"Impact of project management certification on project performance","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Certification; Conformity; Project management; Professional certification (computer technology); Psychology; Knowledge management; Medical education; Business; Management; Computer science; Medicine; Social psychology","score_opus":0.14333826271795458,"score_gpt":0.42611742260399316,"score_spread":0.2827791598860386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3152917775","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99206406,0.00009381848,0.00021969927,0.00025724818,0.000008998027,0.000013553745,0.000021215063,0.000010750256,0.007310686],"genre_scores_gemma":[0.99955314,0.000026222775,0.00007189876,0.000009557773,0.000003240952,0.00000208342,0.000012775804,0.000001297606,0.00031966815],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9952656,0.0022946317,0.00015560414,0.00021776857,0.0012337664,0.000832603],"domain_scores_gemma":[0.97025067,0.010972524,0.006464489,0.0009990409,0.0047037895,0.0066094007],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033694713,0.00018638547,0.000146889,0.0005241977,0.00050058967,0.0012692882,0.00024149605,0.00023446756,0.0041677007],"category_scores_gemma":[0.020757802,0.000073618365,0.00015755596,0.0003953652,0.00087482185,0.00034928738,0.0012871369,0.0006600633,0.0003087858],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042826874,0.0011384996,0.86006725,0.00014579034,0.000070865084,0.0005415769,0.0022130604,0.0021963085,0.0029283834,0.0013916859,0.0011512444,0.12772708],"study_design_scores_gemma":[0.000009474853,0.00062830804,0.9945281,0.00004687247,0.000015729986,0.00012665456,0.001974089,0.00068738917,0.0006251221,0.00019642343,0.0011496522,0.000012261032],"about_ca_topic_score_codex":0.0036641576,"about_ca_topic_score_gemma":0.0049491785,"teacher_disagreement_score":0.0041677007,"about_ca_system_score_codex":0.0012766449,"about_ca_system_score_gemma":0.0025783656,"threshold_uncertainty_score":0.017819643},"labels":[],"label_agreement":null},{"id":"W3153162649","doi":"10.5267/j.jpm.2021.4.002","title":"Prioritizing risk events of a large hydroelectric project using fuzzy analytic hierarchy process","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Hydroelectricity; Vagueness; Euclidean distance; Rank (graph theory); Mathematics; Computer science; Statistics; Fuzzy logic; Operations research; Artificial intelligence; Engineering","score_opus":0.15183965803785865,"score_gpt":0.48126620760107713,"score_spread":0.3294265495632185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153162649","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3397741,0.00036073037,0.65467703,0.000389012,0.000028561955,0.00057986286,0.0001346985,0.00011690817,0.0039390884],"genre_scores_gemma":[0.83559763,0.00027694934,0.1632545,0.0000167255,0.000019273859,0.0002180565,0.00009474611,0.000009281238,0.00051289995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963399,0.001553747,0.00024814164,0.00026304985,0.0013497114,0.00024544212],"domain_scores_gemma":[0.9952173,0.0030902126,0.00060006,0.00007419972,0.00081959204,0.00019870781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052977423,0.0008773985,0.00093995593,0.0040309806,0.0011756915,0.0028370977,0.0007699229,0.00076033943,0.0008930651],"category_scores_gemma":[0.009799372,0.00039454852,0.0012570363,0.00242456,0.00057646533,0.0017116788,0.001313475,0.0008876874,0.000064274966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039189163,0.00029234274,0.0121722575,0.0005698456,0.00027135885,0.0006209796,0.002069932,0.8130099,0.009810353,0.023953743,0.00097695,0.1358603],"study_design_scores_gemma":[0.000021866268,0.00016291985,0.0029950694,0.000044810142,0.00007309054,0.000044588516,0.0005727682,0.9834237,0.0016890104,0.01044116,0.0004918938,0.000039153307],"about_ca_topic_score_codex":0.009440971,"about_ca_topic_score_gemma":0.009549422,"teacher_disagreement_score":0.009440971,"about_ca_system_score_codex":0.0023866268,"about_ca_system_score_gemma":0.0033795421,"threshold_uncertainty_score":0.028017461},"labels":[],"label_agreement":null},{"id":"W3156546971","doi":"10.5267/j.jpm.2021.2.003","title":"Modeling projects interdependencies to measure their synergic impacts on a project portfolio","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interdependence; Portfolio; Project portfolio management; Measure (data warehouse); Selection (genetic algorithm); Computer science; Process (computing); Set (abstract data type); Application portfolio management; Operations research; Management science; Project management; Risk analysis (engineering); Systems engineering; Business; Engineering; Data mining; Machine learning","score_opus":0.15113782510614707,"score_gpt":0.3755062618083261,"score_spread":0.224368436702179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156546971","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15078,0.00021093659,0.84266216,0.00014712286,0.000014953115,0.0002244599,0.00021277778,0.00015814685,0.0055895513],"genre_scores_gemma":[0.8347357,0.00034476825,0.16121732,0.000025135234,0.000010406533,0.0004979001,0.00026648305,0.000031343865,0.002870901],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867517,0.0006394766,0.000059132806,0.00019150665,0.00030220364,0.0001325272],"domain_scores_gemma":[0.99822813,0.0012691729,0.00023874755,0.00007410309,0.00014224651,0.000047743953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002196672,0.001101097,0.000691908,0.0018206752,0.0003071428,0.0012957896,0.00064628484,0.00078758114,0.002146711],"category_scores_gemma":[0.0041261585,0.00042832378,0.0008474354,0.0021965485,0.00036795312,0.0011133564,0.0010103653,0.0007848839,0.0002147251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022239077,0.000039643855,0.0020438891,0.000039749175,0.000025591946,0.000033721888,0.000025184201,0.9819589,0.0008486539,0.003030624,0.00010570968,0.011826021],"study_design_scores_gemma":[0.000004141774,0.00004547541,0.00061747077,0.000005169797,0.0000125286815,0.000014485082,0.000018786357,0.99662966,0.0003935447,0.0020258497,0.00022840222,0.0000044342423],"about_ca_topic_score_codex":0.0043321108,"about_ca_topic_score_gemma":0.0036757381,"teacher_disagreement_score":0.0043321108,"about_ca_system_score_codex":0.00092329003,"about_ca_system_score_gemma":0.0015993507,"threshold_uncertainty_score":0.011617243},"labels":[],"label_agreement":null},{"id":"W3156854904","doi":"10.5267/j.jpm.2021.4.001","title":"Critical success factors for human resource management of construction project","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Critical success factor; Process (computing); Knowledge management; Computer science; Process management; Human resource management; Human resources; Project management; Management science; Order (exchange); Resource (disambiguation); Risk analysis (engineering); Business; Systems engineering; Engineering; Management","score_opus":0.12934280134026777,"score_gpt":0.4364547075706827,"score_spread":0.30711190623041495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156854904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9274228,0.0015873581,0.025025701,0.0014444247,0.00008790238,0.00065014494,0.0002729447,0.000071041126,0.043437727],"genre_scores_gemma":[0.9957268,0.0001629764,0.0031442952,0.00001561347,0.000014749908,0.00010470454,0.00004253724,0.000006943086,0.00078138936],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99594706,0.0013022328,0.00021894841,0.00016374617,0.0019008269,0.00046723516],"domain_scores_gemma":[0.9795284,0.010260123,0.003436114,0.00037080527,0.0040499754,0.0023545239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030040785,0.000597186,0.00026093595,0.0047357576,0.0014370224,0.0026404962,0.00031250616,0.0004350749,0.0051447484],"category_scores_gemma":[0.020572538,0.00021931468,0.00045298034,0.0021417923,0.0012258155,0.001273654,0.0010348245,0.0007573727,0.00027290866],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064458215,0.0007142526,0.5762109,0.00086486165,0.00035801448,0.0008128421,0.0093056485,0.01563596,0.0035010919,0.059282847,0.008212273,0.32445666],"study_design_scores_gemma":[0.000106779094,0.0016621478,0.8428914,0.0011797174,0.00025739343,0.00074511586,0.021135533,0.05233399,0.0038733005,0.046260647,0.029308172,0.00024580266],"about_ca_topic_score_codex":0.005716516,"about_ca_topic_score_gemma":0.005944841,"teacher_disagreement_score":0.005716516,"about_ca_system_score_codex":0.0029557857,"about_ca_system_score_gemma":0.0045082024,"threshold_uncertainty_score":0.02144581},"labels":[],"label_agreement":null},{"id":"W3156976725","doi":"10.5267/j.jpm.2021.2.002","title":"An investigation into the factors causing international development project failure in developing countries: Focus on Afghanistan","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Supply Chain Resilience and Risk Management","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Focus group; Perception; Survey research; Business; Psychology; Applied psychology; Marketing; Geography","score_opus":0.02424630641797108,"score_gpt":0.2802063810610479,"score_spread":0.2559600746430768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156976725","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9982681,0.00016231931,0.00014875099,0.00024590304,0.0000026556245,0.00001692319,0.000020828866,0.0000012221204,0.0011333129],"genre_scores_gemma":[0.9993724,0.00028839248,0.00011025685,0.00003674795,0.0000026141097,0.000013619545,0.000017921226,5.6999824e-7,0.00015753669],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99877447,0.00045782854,0.00008484122,0.00007024507,0.00021549691,0.00039709936],"domain_scores_gemma":[0.99624866,0.0014202166,0.0013226921,0.0000836811,0.0005658446,0.0003589329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026441354,0.0004245259,0.00027195126,0.0018680247,0.0023133273,0.0015893816,0.00032337144,0.00043501452,0.0015490944],"category_scores_gemma":[0.00475939,0.00022114888,0.00023580667,0.0024560343,0.0010981398,0.0014830367,0.0014635413,0.0006750504,0.00012018711],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078145036,0.0002333919,0.8720105,0.00031269103,0.000028419505,0.0016518263,0.08165505,0.0002610343,0.0009940101,0.0009058484,0.0005073064,0.04136185],"study_design_scores_gemma":[0.0000035194887,0.00022386322,0.7415786,0.00017589852,0.000019138002,0.0006008535,0.2532864,0.00031141745,0.00033248903,0.00020963662,0.0032395977,0.000018540997],"about_ca_topic_score_codex":0.017607078,"about_ca_topic_score_gemma":0.023997853,"teacher_disagreement_score":0.017607078,"about_ca_system_score_codex":0.0019692313,"about_ca_system_score_gemma":0.0038013365,"threshold_uncertainty_score":0.035009205},"labels":[],"label_agreement":null},{"id":"W3166918224","doi":"10.5267/j.jpm.2021.6.001","title":"Factors affecting the competition of an irrigation construction project using state budget funds","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Competition (biology); Investment (military); Irrigation; Finance; State (computer science); Capital (architecture); Computer science; Geography","score_opus":0.07119858998104805,"score_gpt":0.308627016746993,"score_spread":0.23742842676594494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3166918224","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99572444,0.00002861588,0.00017325756,0.000094485236,0.0000019899817,0.000022375854,0.000030167028,0.0000029762261,0.003921623],"genre_scores_gemma":[0.9987161,0.000035439865,0.00022071644,0.0000063933694,0.0000023440757,0.000013201941,0.000040570092,0.00000222787,0.00096290675],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9961881,0.001705005,0.000280735,0.00017554214,0.0009898231,0.0006607628],"domain_scores_gemma":[0.98216486,0.005209357,0.0068818196,0.00030048075,0.0027107047,0.0027328094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033630435,0.00014057446,0.00014023841,0.0008172445,0.00087817665,0.0017396705,0.0004208961,0.00033775766,0.0045831394],"category_scores_gemma":[0.01500318,0.00015179039,0.00013364691,0.0008860155,0.000552777,0.00088841125,0.0007735198,0.00046331075,0.00031960433],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026850356,0.00039096313,0.9420151,0.00010596036,0.000032280816,0.00085709983,0.0058841305,0.005194713,0.0033056752,0.0026839322,0.0015992711,0.037662417],"study_design_scores_gemma":[0.000008708688,0.00026670817,0.97344106,0.000057776855,0.000013189665,0.0002207595,0.015559339,0.0033502793,0.00076556246,0.0003028512,0.005985026,0.000028766626],"about_ca_topic_score_codex":0.018236004,"about_ca_topic_score_gemma":0.02522567,"teacher_disagreement_score":0.018236004,"about_ca_system_score_codex":0.0018324597,"about_ca_system_score_gemma":0.003691092,"threshold_uncertainty_score":0.03625971},"labels":[],"label_agreement":null},{"id":"W3170121115","doi":"10.5267/j.jpm.2021.5.001","title":"R-method: A simple ranking method for multi-attribute decision-making in the industrial environment","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ranking (information retrieval); Simple (philosophy); Computer science; Data mining; Feature (linguistics); Decision maker; Process (computing); Fuzzy logic; Artificial intelligence; Machine learning; Rank (graph theory); Mathematics; Operations research","score_opus":0.36533015703090754,"score_gpt":0.5256598332919963,"score_spread":0.16032967626108874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3170121115","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011772588,0.00027711876,0.99676895,0.000066328736,0.000049049086,0.00020239454,0.000080054815,0.0004515512,0.0009272473],"genre_scores_gemma":[0.024517084,0.00025034172,0.9736143,0.00005718191,0.00004378202,0.0004570088,0.0001304859,0.00010152003,0.00082836114],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9865957,0.008449723,0.00062275503,0.00087454874,0.0032133388,0.00024392056],"domain_scores_gemma":[0.9925016,0.005204985,0.0005914707,0.00040706855,0.0011515727,0.00014332066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0098627005,0.0023324448,0.0030236738,0.004357257,0.00096512726,0.00241834,0.002131737,0.0014587535,0.007842424],"category_scores_gemma":[0.0115619255,0.0007158151,0.0027474156,0.0035742533,0.0010586617,0.0022359225,0.0015866403,0.0019877627,0.0022268996],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032695848,0.00029019685,0.001538654,0.0029057947,0.0007605479,0.00038885366,0.00044884888,0.14066344,0.007784301,0.054339007,0.011323634,0.77922976],"study_design_scores_gemma":[0.00028943142,0.0005158551,0.0012545678,0.00034925976,0.00023550027,0.0006524014,0.00019595529,0.8752998,0.0066165226,0.082307845,0.032010797,0.0002720012],"about_ca_topic_score_codex":0.0017574799,"about_ca_topic_score_gemma":0.00250225,"teacher_disagreement_score":0.0098627005,"about_ca_system_score_codex":0.00096865674,"about_ca_system_score_gemma":0.0025200516,"threshold_uncertainty_score":0.052159607},"labels":[],"label_agreement":null},{"id":"W3171114511","doi":"10.5267/j.jpm.2021.5.002","title":"Solving open travelling salesman subset-tour problem through a hybrid genetic algorithm","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Travelling salesman problem; Tree traversal; Crossover; Christofides algorithm; Benchmark (surveying); 2-opt; Computer science; Selection (genetic algorithm); Genetic algorithm; Traverse; Set (abstract data type); Bottleneck traveling salesman problem; Lin–Kernighan heuristic; Nearest neighbour algorithm; Mathematical optimization; Mutation; Permutation (music); Algorithm; Mathematics; Artificial intelligence; Machine learning; Geography; Biology","score_opus":0.03150600752234208,"score_gpt":0.29639048382187294,"score_spread":0.2648844762995309,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3171114511","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08439012,0.00052273483,0.9066107,0.00021615706,0.00006840036,0.000114031114,0.00007489948,0.0005525273,0.007450389],"genre_scores_gemma":[0.6217559,0.00049211417,0.37180015,0.00016255076,0.0000415998,0.00026416694,0.0002761935,0.00007826743,0.0051290547],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997379,0.000066932815,0.000011303837,0.000051608793,0.00008156011,0.000050634386],"domain_scores_gemma":[0.9998103,0.00008900335,0.000022789342,0.000014663895,0.000046082383,0.000017204085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034739551,0.0006060682,0.0007973885,0.0007310295,0.0004185602,0.0007510526,0.0010424202,0.00081970356,0.0014492328],"category_scores_gemma":[0.0006855348,0.0003210978,0.00077944295,0.0008583193,0.00033653015,0.00059440883,0.0005961404,0.00047660538,0.00017922677],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054919765,0.00007477255,0.00089083874,0.000055445817,0.00006601984,0.00010816659,0.000071273585,0.9170251,0.0026734022,0.006929716,0.0012269407,0.0708234],"study_design_scores_gemma":[0.0000110874735,0.00003283008,0.00011675985,0.000005029847,0.000012232599,0.000035197092,0.000016768812,0.9975084,0.00034337613,0.0012796227,0.0006342837,0.000004314106],"about_ca_topic_score_codex":0.006919732,"about_ca_topic_score_gemma":0.00478004,"teacher_disagreement_score":0.006919732,"about_ca_system_score_codex":0.0004968002,"about_ca_system_score_gemma":0.0010468634,"threshold_uncertainty_score":0.013758957},"labels":[],"label_agreement":null},{"id":"W3171150266","doi":"10.5267/j.jpm.2021.5.003","title":"Bibliometric evaluation of research on political risks in construction projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chinese Academy of Engineering; National Science Foundation","keywords":"Political risk; Politics; Context (archaeology); Risk management; Political science; Content analysis; Data science; Risk analysis (engineering); Business; Computer science; Sociology; Social science; Geography; Finance","score_opus":0.1848197151092685,"score_gpt":0.45361146058202784,"score_spread":0.2687917454727593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3171150266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5004606,0.18056938,0.013594305,0.007801629,0.0014517715,0.0013294598,0.0582838,0.0008991227,0.23560987],"genre_scores_gemma":[0.8741034,0.08172527,0.011092292,0.0003528887,0.0011687701,0.0011576979,0.024295837,0.00015004708,0.0059538386],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9620038,0.007756361,0.00724163,0.0017761167,0.020182079,0.0010400158],"domain_scores_gemma":[0.85433763,0.089770295,0.021230528,0.0047978247,0.027925614,0.0019381591],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.01707327,0.00084641366,0.0018404067,0.21838045,0.00211022,0.009189611,0.0010466131,0.0010299193,0.0065764254],"category_scores_gemma":[0.10698915,0.0003327673,0.0014253577,0.26342884,0.0015159169,0.0061468747,0.0036729085,0.0006339242,0.0011494856],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039670253,0.0002366685,0.24797559,0.0492037,0.0014379326,0.0011514766,0.011568216,0.002378731,0.0026019302,0.033595182,0.038228285,0.6112255],"study_design_scores_gemma":[0.00006759357,0.00027743206,0.6101775,0.01661533,0.002804241,0.0023408844,0.027993718,0.0052856635,0.004356084,0.019584198,0.31020987,0.0002874814],"about_ca_topic_score_codex":0.0043084524,"about_ca_topic_score_gemma":0.005099233,"teacher_disagreement_score":0.78161955,"about_ca_system_score_codex":0.0034978513,"about_ca_system_score_gemma":0.007072885,"threshold_uncertainty_score":0.09029317},"labels":[],"label_agreement":null},{"id":"W3171513113","doi":"10.5267/j.jpm.2021.5.004","title":"Causes of government construction projects’ abandonment","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Abandonment (legal); Government (linguistics); Setback; Politics; Project management; Business; Public administration; Public relations; Political science; Economic growth; Economics; Management","score_opus":0.08659125459836879,"score_gpt":0.35455808397153615,"score_spread":0.26796682937316735,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3171513113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99057734,0.0014481682,0.0006899102,0.0028997164,0.000020710882,0.000070275,0.00018618225,0.000015667976,0.004092145],"genre_scores_gemma":[0.99817574,0.00079666806,0.00028116853,0.00007302515,0.00000918596,0.00002813878,0.00010734453,0.000006881535,0.0005218883],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99406224,0.0017342331,0.0005206029,0.00039106692,0.0023116108,0.0009802876],"domain_scores_gemma":[0.96443397,0.00893338,0.019269986,0.0011884475,0.0042005847,0.0019734818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004710576,0.0002882289,0.000406601,0.0023290573,0.001968032,0.0014219425,0.00089777214,0.0006816773,0.0026166479],"category_scores_gemma":[0.023476142,0.0003796892,0.0003922087,0.0044323234,0.0025197996,0.0011827569,0.0026618745,0.0020474663,0.0002243308],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009215878,0.00007464376,0.9112099,0.00032577166,0.000047671154,0.0024634604,0.03378087,0.0011802877,0.0006031238,0.0040808236,0.0029806737,0.04316067],"study_design_scores_gemma":[0.000008440633,0.0000614507,0.9237223,0.00045556368,0.00001981682,0.0012690792,0.054159436,0.0011438386,0.0002434596,0.0019397321,0.016944306,0.00003245035],"about_ca_topic_score_codex":0.04000292,"about_ca_topic_score_gemma":0.042270903,"teacher_disagreement_score":0.04000292,"about_ca_system_score_codex":0.005786673,"about_ca_system_score_gemma":0.0060342313,"threshold_uncertainty_score":0.07954013},"labels":[],"label_agreement":null},{"id":"W3201806781","doi":"10.5267/j.jpm.2021.7.001","title":"Adoption of a multi-criteria approach for the selection of operational measures in a maritime environment","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Maritime Ports and Logistics","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Port (circuit theory); Operations research; Fuzzy logic; Computer science; Productivity; Entropy (arrow of time); Transport engineering; Operations management; Engineering; Economics","score_opus":0.03758015996582573,"score_gpt":0.25632497448507363,"score_spread":0.2187448145192479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201806781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059193905,0.002585994,0.9133213,0.0019985796,0.00013739632,0.002320896,0.00021972878,0.00013028858,0.020091902],"genre_scores_gemma":[0.35389358,0.00084974855,0.64236516,0.00018526391,0.00004836753,0.0013483174,0.00014674645,0.000028753559,0.0011341153],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.97296125,0.017078051,0.0017134211,0.0011511025,0.0065143285,0.00058184075],"domain_scores_gemma":[0.983426,0.010349373,0.0018483205,0.00033918465,0.0035729506,0.00046423983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026643032,0.0024814808,0.0023373398,0.011151057,0.0019991344,0.006692461,0.002497659,0.0019186119,0.0020006008],"category_scores_gemma":[0.022316772,0.00076555775,0.0026966073,0.0063795764,0.002193979,0.0028524299,0.0031514673,0.0024209633,0.00021654674],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038376794,0.00111091,0.014488269,0.005994022,0.002008822,0.0016199509,0.006424949,0.46375057,0.010726723,0.17743042,0.0037220959,0.31233963],"study_design_scores_gemma":[0.00017092504,0.0021349653,0.009360933,0.0025196567,0.0005563473,0.00046268568,0.006883676,0.8180843,0.0036491298,0.13851097,0.017250163,0.00041623152],"about_ca_topic_score_codex":0.006705781,"about_ca_topic_score_gemma":0.01214793,"teacher_disagreement_score":0.026643032,"about_ca_system_score_codex":0.006369957,"about_ca_system_score_gemma":0.0085578365,"threshold_uncertainty_score":0.14090353},"labels":[],"label_agreement":null},{"id":"W3202822179","doi":"10.5267/j.jpm.2021.8.001","title":"A new hybrid method for selecting the best project manager: TODIM-FSE and Behavioral TOPSIS","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"TOPSIS; Prospect theory; Context (archaeology); Decision maker; Loss aversion; Computer science; Multiple-criteria decision analysis; Process (computing); Odds; Risk-seeking; Risk analysis (engineering); Operations research; Engineering; Business; Psychology; Economics; Machine learning; Logistic regression; Social psychology; Microeconomics","score_opus":0.27354828380499374,"score_gpt":0.5208362236672347,"score_spread":0.24728793986224096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202822179","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010141831,0.000118849355,0.984738,0.00018379139,0.000044778717,0.00022361192,0.00013283093,0.0002154322,0.004200759],"genre_scores_gemma":[0.17527902,0.0002155421,0.82173157,0.00008114905,0.000017340422,0.00071320246,0.00030128442,0.000032083124,0.0016288059],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9939122,0.0030124134,0.0005013115,0.00053438736,0.0018297384,0.00020997098],"domain_scores_gemma":[0.99611545,0.0022265394,0.00024506619,0.0001871496,0.0011323406,0.00009338291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058682556,0.0015758135,0.0013133916,0.0074189105,0.0010609071,0.0031399897,0.0015068565,0.0010541631,0.0049497564],"category_scores_gemma":[0.010769389,0.0004379913,0.0019175821,0.0042596017,0.00078452914,0.001904052,0.0020230531,0.0010710122,0.0007183494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019720633,0.0003629782,0.009376627,0.0012768172,0.00058589224,0.00020390071,0.0017112936,0.113343194,0.006204083,0.05576433,0.0028643091,0.8081094],"study_design_scores_gemma":[0.0000761001,0.00039030606,0.0046584923,0.00033957366,0.00021309975,0.0003431221,0.0016942023,0.92192394,0.0045881304,0.05234745,0.013271658,0.00015395971],"about_ca_topic_score_codex":0.0043572555,"about_ca_topic_score_gemma":0.0055165654,"teacher_disagreement_score":0.0074189105,"about_ca_system_score_codex":0.0015602829,"about_ca_system_score_gemma":0.0024244841,"threshold_uncertainty_score":0.031034648},"labels":[],"label_agreement":null},{"id":"W3203845064","doi":"10.5267/j.jpm.2021.7.003","title":"Assessing public sector road construction projects’ critical success factors in a developing economy: Definitive stakeholders’ perspective","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Language change; Context (archaeology); Public sector; Critical success factor; Government (linguistics); Business; Order (exchange); Payment; Politics; Finance; Marketing; Political science; Economics; Economy; Geography; Law","score_opus":0.3750815954891311,"score_gpt":0.42967026342328707,"score_spread":0.054588667934155954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3203845064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9952094,0.00007391987,0.0012325491,0.00020981376,0.0000020372613,0.000045859695,0.000028841236,0.0000033220147,0.0031943696],"genre_scores_gemma":[0.99942374,0.0000582183,0.00038489472,0.0000062348035,7.768226e-7,0.000012847393,0.0000099683575,7.4913413e-7,0.000102547354],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99612325,0.0019665859,0.00022265811,0.00015533048,0.0008690855,0.00066304515],"domain_scores_gemma":[0.98310834,0.00933398,0.0035706572,0.00028272753,0.0024650733,0.0012392235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069379713,0.00037355657,0.00030018218,0.003432255,0.0015561522,0.0025350256,0.00030848038,0.00042416507,0.0019167456],"category_scores_gemma":[0.016269103,0.0002628466,0.00016543352,0.0026675342,0.0017403506,0.002043604,0.002359792,0.0005811384,0.0001355544],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032344682,0.00031475708,0.70122355,0.00074522715,0.00006734679,0.0027300345,0.16589452,0.0018215778,0.0060675843,0.008840323,0.00089976465,0.11107191],"study_design_scores_gemma":[0.000008079603,0.00037624672,0.48762518,0.00031023676,0.000030375513,0.0006966037,0.4965181,0.0019387008,0.0018373674,0.0030601493,0.0075512994,0.00004755725],"about_ca_topic_score_codex":0.0027616355,"about_ca_topic_score_gemma":0.004789836,"teacher_disagreement_score":0.0069379713,"about_ca_system_score_codex":0.002307944,"about_ca_system_score_gemma":0.0029982603,"threshold_uncertainty_score":0.036691904},"labels":[],"label_agreement":null},{"id":"W3204734281","doi":"10.5267/j.jpm.2021.9.001","title":"An improved algorithm to minimize the total completion time in a two-machine no-wait flow-shop with uncertain setup times","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Scheduling (production processes); Algorithm; Python (programming language); Range (aeronautics); Mathematical optimization; Mathematics; Engineering","score_opus":0.00814068058952495,"score_gpt":0.25099864646142434,"score_spread":0.2428579658718994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204734281","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027310355,0.00018574418,0.9708509,0.0001033069,0.000043422562,0.000076203665,0.0000457343,0.00028672043,0.0010976547],"genre_scores_gemma":[0.46671847,0.00015306092,0.5302651,0.00007894252,0.000041145922,0.00023375603,0.00016908451,0.00007993578,0.0022604258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994474,0.00012446627,0.000029506407,0.00014953967,0.00014905247,0.000099969686],"domain_scores_gemma":[0.99929845,0.0003547807,0.00009960291,0.00004943857,0.00013798314,0.00005973066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001270726,0.0007963732,0.0011848531,0.0005642895,0.000561665,0.00070785586,0.0012988421,0.0010152159,0.001473428],"category_scores_gemma":[0.001854426,0.0004880218,0.0007100767,0.0005985307,0.00045139497,0.00074050773,0.00072154525,0.0009165333,0.00021687674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010203186,0.000068514535,0.00043704666,0.000093771065,0.000028085695,0.00003997878,0.00004377005,0.9494531,0.002154127,0.0030939719,0.0006545845,0.043831132],"study_design_scores_gemma":[0.000020259806,0.000057418085,0.00012639396,0.000003913234,0.000005997658,0.00001625129,0.0000069021753,0.9982381,0.0004732355,0.00081241655,0.00023494268,0.000004186197],"about_ca_topic_score_codex":0.004762158,"about_ca_topic_score_gemma":0.004326584,"teacher_disagreement_score":0.004762158,"about_ca_system_score_codex":0.00073305954,"about_ca_system_score_gemma":0.0031260608,"threshold_uncertainty_score":0.009468913},"labels":[],"label_agreement":null},{"id":"W3204810767","doi":"10.5267/j.jpm.2021.7.002","title":"The utilization of project risk monitoring and control practices and their relationship with project success in construction projects","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project risk management; Risk management plan; Risk management; Risk analysis (engineering); Audit; Control (management); Risk assessment; Business; IT risk management; Project manager; Project management; Identification (biology); Project management triangle; Operations management; Engineering; Accounting; Computer science; Finance; Computer security; Systems engineering","score_opus":0.13300200339623194,"score_gpt":0.39163670869259215,"score_spread":0.25863470529636023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204810767","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99895155,0.00007580916,0.0002293817,0.00005932447,0.0000014684416,0.000012228761,0.000010811436,0.000004103386,0.00065531826],"genre_scores_gemma":[0.99959844,0.00007143043,0.00020030657,0.000005078993,0.000001904154,0.000010452622,0.000014728755,0.0000016929195,0.000095906806],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99340606,0.0031914534,0.00069167785,0.00029795567,0.0018235644,0.00058923423],"domain_scores_gemma":[0.934499,0.0256087,0.027780663,0.0020076963,0.0059106294,0.004193349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063691204,0.0002971933,0.00023364657,0.0016334334,0.00066470384,0.0013303707,0.0004122006,0.00035791812,0.0007341837],"category_scores_gemma":[0.031144027,0.00026397873,0.0003203169,0.0011945689,0.0011515833,0.00096609275,0.0013451228,0.000846765,0.00013585032],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000326095,0.0001697231,0.9877522,0.000024585754,0.00004841663,0.000059072507,0.0016955729,0.0002758527,0.00022908305,0.00008602673,0.00007024225,0.009556499],"study_design_scores_gemma":[0.0000017674271,0.00017521066,0.9958462,0.00002313245,0.000012318543,0.00007491098,0.002956446,0.0004599786,0.00014257572,0.000049301198,0.0002474965,0.000010654701],"about_ca_topic_score_codex":0.0049549188,"about_ca_topic_score_gemma":0.005849786,"teacher_disagreement_score":0.0063691204,"about_ca_system_score_codex":0.0006408011,"about_ca_system_score_gemma":0.0012765768,"threshold_uncertainty_score":0.03368348},"labels":[],"label_agreement":null},{"id":"W4200016895","doi":"10.5267/j.jpm.2021.11.001","title":"The effect of project management through e-business and garage sales on poverty reduction","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Innovation and Socioeconomic Development","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Poverty; Poverty reduction; Descriptive statistics; Marketing; Psychology; Business; Economics; Economic growth","score_opus":0.014991113492573158,"score_gpt":0.25761419967856475,"score_spread":0.2426230861859916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200016895","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99263483,0.00025732277,0.00019202595,0.00026702706,0.00001119071,0.000039222912,0.000016698554,0.000015384308,0.0065662256],"genre_scores_gemma":[0.9979698,0.0003036021,0.00047489433,0.000038430197,0.000009115619,0.000022370861,0.000012056026,0.0000016451462,0.0011680557],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99915683,0.00046165497,0.000029765979,0.00003994441,0.00014141711,0.000170399],"domain_scores_gemma":[0.996461,0.0017078426,0.00061378366,0.00010737547,0.00025418692,0.0008558698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008483314,0.00019555849,0.00014621015,0.0003782818,0.00033101154,0.0004964716,0.00021663574,0.00023633604,0.005316475],"category_scores_gemma":[0.003993604,0.00007745718,0.00040656107,0.00030192986,0.00020893071,0.00039544134,0.00062244135,0.0004192988,0.00031777832],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019102859,0.025388049,0.24824469,0.00092338125,0.00033510497,0.0004801224,0.002607642,0.0027784002,0.0055251764,0.0015778936,0.0026311548,0.7075981],"study_design_scores_gemma":[0.00014080068,0.011812461,0.9661203,0.00047755224,0.000284343,0.0002586431,0.0047263587,0.0028283484,0.004206943,0.00067319424,0.00844436,0.000026690203],"about_ca_topic_score_codex":0.0008802078,"about_ca_topic_score_gemma":0.0014265948,"teacher_disagreement_score":0.005316475,"about_ca_system_score_codex":0.00022146241,"about_ca_system_score_gemma":0.0008943438,"threshold_uncertainty_score":0.01778537},"labels":[],"label_agreement":null},{"id":"W4200244473","doi":"10.5267/j.jpm.2021.10.002","title":"Review of conventional metaheuristic techniques for resource-constrained project scheduling problem","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Metaheuristic; Heuristics; Mathematical optimization; Simulated annealing; Particle swarm optimization; Ant colony optimization algorithms; Scheduling (production processes); Heuristic; Meta heuristic; Genetic algorithm; Resource constraints; Operations research; Artificial intelligence; Machine learning; Algorithm; Mathematics; Distributed computing","score_opus":0.11023091709015714,"score_gpt":0.4141277935501616,"score_spread":0.30389687646000446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200244473","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004891805,0.85223,0.11885454,0.0013774968,0.0010435123,0.00014150958,0.00029903016,0.00019535121,0.020966765],"genre_scores_gemma":[0.04060782,0.84252644,0.10979464,0.00056478917,0.0010228078,0.00020327,0.00073303794,0.00010818416,0.0044390038],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99918085,0.00023608295,0.00012341894,0.00011206002,0.00028191964,0.00006565892],"domain_scores_gemma":[0.9991159,0.0005194,0.00008987931,0.000043188356,0.00020533746,0.00002631911],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010126203,0.0014977149,0.0010974418,0.002445181,0.0005063844,0.0013823687,0.001457705,0.0010449233,0.0028120738],"category_scores_gemma":[0.0021022002,0.0005997082,0.0016985888,0.0062543745,0.0002994915,0.0015050288,0.00049631856,0.00085798197,0.0010102941],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013063852,0.00017150964,0.00078848895,0.019868061,0.0004729783,0.0003137643,0.00015592157,0.08219002,0.0033077074,0.038087532,0.02520685,0.82930654],"study_design_scores_gemma":[0.00007965555,0.00046850738,0.0026666769,0.007830977,0.00094112224,0.0012242493,0.00046854847,0.139569,0.004768455,0.04771216,0.794127,0.00014371211],"about_ca_topic_score_codex":0.0035602872,"about_ca_topic_score_gemma":0.0034126167,"teacher_disagreement_score":0.0035602872,"about_ca_system_score_codex":0.000908655,"about_ca_system_score_gemma":0.0020119932,"threshold_uncertainty_score":0.0094073415},"labels":[],"label_agreement":null},{"id":"W4200419669","doi":"10.5267/j.jpm.2021.9.002","title":"Project scheduling and buffer management: A comprehensive review and future directions","year":2021,"lang":"en","type":"review","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Buffer (optical fiber); Project management; Project planning; Computer science; Scheduling (production processes); Sizing; Project management triangle; Project portfolio management; Operations research; Process management; Systems engineering; Operations management; Engineering","score_opus":0.16050096408809952,"score_gpt":0.44655382815814765,"score_spread":0.28605286407004815,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200419669","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013938131,0.9984456,0.00035201196,0.00036514524,0.0001244821,0.0000047767085,0.000015233063,0.000005678062,0.0005476782],"genre_scores_gemma":[0.0011849438,0.998018,0.00039770082,0.00010156174,0.00012887626,0.0000069784287,0.000020630763,0.0000022935906,0.00013897078],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991161,0.00023379293,0.00015484191,0.00016320146,0.0002616195,0.00007040232],"domain_scores_gemma":[0.9937688,0.004677163,0.00052297383,0.0000895763,0.00080702454,0.00013446574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024707525,0.0011364066,0.0017024194,0.0033515445,0.00048407578,0.0021725306,0.0014459278,0.0016241953,0.0051078764],"category_scores_gemma":[0.0051497393,0.00062781543,0.0010633259,0.006734156,0.00064272777,0.0027089228,0.00087711937,0.0013431604,0.0011566746],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007620567,0.00009850392,0.0004786629,0.055199854,0.00014350495,0.00011123053,0.00020077157,0.0023963267,0.0004222127,0.012237321,0.018465172,0.9101702],"study_design_scores_gemma":[0.000025081725,0.00022946537,0.0022816502,0.048233535,0.0006410294,0.0006811976,0.00059779116,0.0012583741,0.0005272534,0.011681424,0.93375415,0.00008905287],"about_ca_topic_score_codex":0.004866244,"about_ca_topic_score_gemma":0.0067353398,"teacher_disagreement_score":0.0051078764,"about_ca_system_score_codex":0.001393203,"about_ca_system_score_gemma":0.0057617323,"threshold_uncertainty_score":0.017087579},"labels":[],"label_agreement":null},{"id":"W4200532495","doi":"10.5267/j.jpm.2021.10.003","title":"Development of a hybrid AHP and Dempster-Shafer theory of evidence for project risk assessment problem","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Dempster–Shafer theory; Analytic hierarchy process; Taguchi methods; Computer science; Risk analysis (engineering); Risk assessment; Operations research; Mathematics; Artificial intelligence; Machine learning; Business; Computer security","score_opus":0.5028392919532441,"score_gpt":0.5270742277863069,"score_spread":0.0242349358330628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200532495","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030357921,0.00022510285,0.99525,0.00015180146,0.000022681199,0.0001536348,0.000041415606,0.000041353323,0.0010782749],"genre_scores_gemma":[0.14981224,0.00048042944,0.8477963,0.00009419306,0.000049717644,0.00080562604,0.00011600693,0.000018710432,0.0008267306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9916916,0.0037132048,0.0006289627,0.0005950469,0.0030769312,0.00029440262],"domain_scores_gemma":[0.99275196,0.005253633,0.0003694463,0.00016700437,0.0012926807,0.00016522597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007548313,0.0012270275,0.0015768949,0.0052404,0.0009675845,0.0025181752,0.0023503911,0.0018920763,0.0018881345],"category_scores_gemma":[0.013634046,0.00087128766,0.0019340558,0.0031885067,0.0009275958,0.0026674187,0.0029270088,0.0018730494,0.00020797648],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012720894,0.00016103321,0.0020805618,0.0010589766,0.0004251392,0.00035063285,0.0005349775,0.7023471,0.002322282,0.06626573,0.0016233645,0.222703],"study_design_scores_gemma":[0.00003272082,0.000090197165,0.00025800295,0.00009857002,0.000047653662,0.00008260942,0.00015853954,0.96982634,0.0007101276,0.026748855,0.0019169158,0.000029464876],"about_ca_topic_score_codex":0.004990877,"about_ca_topic_score_gemma":0.0038461501,"teacher_disagreement_score":0.007548313,"about_ca_system_score_codex":0.001958542,"about_ca_system_score_gemma":0.0043408214,"threshold_uncertainty_score":0.039919794},"labels":[],"label_agreement":null},{"id":"W4200594885","doi":"10.5267/j.jpm.2021.10.001","title":"The attractiveness of public-private partnership for road projects in India","year":2021,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Attractiveness; Public–private partnership; General partnership; Business; Questionnaire; Private sector; Public sector; Descriptive statistics; Marketing; Transport engineering; Finance; Economic growth; Engineering; Economics","score_opus":0.08628025261550354,"score_gpt":0.31594715494078307,"score_spread":0.22966690232527953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200594885","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9833582,0.00009883475,0.0006038773,0.0009910304,0.000011097108,0.000031130978,0.000016248301,0.000007653869,0.014881847],"genre_scores_gemma":[0.9994267,0.00005957283,0.00009314755,0.000021848798,0.0000017872743,0.000006471724,0.0000034956242,0.000001098249,0.00038589025],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99432194,0.0031710467,0.00015785304,0.00013170663,0.0014060796,0.00081135024],"domain_scores_gemma":[0.99392796,0.0016487871,0.0015118928,0.00023430224,0.0008806556,0.0017963292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032501179,0.00012309513,0.00014018119,0.0005526896,0.002941853,0.0042844512,0.0004446092,0.0005176355,0.0033562721],"category_scores_gemma":[0.0065567223,0.00015937473,0.00020230626,0.0007272079,0.0016363107,0.0015505989,0.0032628,0.0010579842,0.00022776841],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044946565,0.00072568475,0.53960866,0.00067940267,0.000099272394,0.0103078345,0.22287667,0.0023283784,0.010539223,0.071414806,0.007382686,0.13358797],"study_design_scores_gemma":[0.000012465057,0.0003998704,0.33699673,0.00019036049,0.000032074295,0.0033991968,0.609387,0.0018618922,0.001127269,0.0036096957,0.04290314,0.000080349666],"about_ca_topic_score_codex":0.004147177,"about_ca_topic_score_gemma":0.006673804,"teacher_disagreement_score":0.0042844512,"about_ca_system_score_codex":0.0020140833,"about_ca_system_score_gemma":0.002823163,"threshold_uncertainty_score":0.01718849},"labels":[],"label_agreement":null},{"id":"W4221127026","doi":"10.5267/j.jpm.2022.1.001","title":"A size-reduction algorithm for the order scheduling problem with total tardiness minimization","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Tardiness; Scheduling (production processes); Computation; Computer science; Reduction (mathematics); Minification; Order (exchange); Algorithm; Mathematical optimization; Mathematics; Schedule; Job shop scheduling; Economics","score_opus":0.00994664725684886,"score_gpt":0.22911583152902104,"score_spread":0.2191691842721722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221127026","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03837763,0.00023707039,0.9560925,0.00022741617,0.00007406041,0.00016413322,0.00007995066,0.00057455985,0.004172723],"genre_scores_gemma":[0.24694847,0.00020267356,0.74943125,0.00011622125,0.00006610641,0.00032712458,0.0003063157,0.00018828339,0.002413515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999209,0.00030358305,0.000037980193,0.00011002991,0.0002438942,0.000095447336],"domain_scores_gemma":[0.99874663,0.0007968148,0.000092209375,0.00013479033,0.00017113454,0.000058501446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010968784,0.0007916579,0.0008413811,0.0008167961,0.00046178914,0.0005394082,0.001010064,0.00080444384,0.0021450245],"category_scores_gemma":[0.0033280507,0.00033602185,0.001101043,0.00084932294,0.00048027045,0.00092634733,0.00084994675,0.0009600807,0.00040450634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035708424,0.0003229846,0.0009974765,0.00031916218,0.00006980579,0.0001241063,0.00015889219,0.7316375,0.012171422,0.017218016,0.004576381,0.2320472],"study_design_scores_gemma":[0.000063185085,0.00013197593,0.00030307067,0.00000973373,0.0000164699,0.000065884306,0.000023471619,0.98966914,0.0017612657,0.0066475174,0.0012995412,0.00000862253],"about_ca_topic_score_codex":0.0024147364,"about_ca_topic_score_gemma":0.002275023,"teacher_disagreement_score":0.0024147364,"about_ca_system_score_codex":0.0006277475,"about_ca_system_score_gemma":0.0017658478,"threshold_uncertainty_score":0.007175803},"labels":[],"label_agreement":null},{"id":"W4225606115","doi":"10.5267/j.jpm.2021.12.001","title":"Earliness/tardiness minimization in a no-wait flow shop with sequence-dependent setup times","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Tardiness; Sequence (biology); Mathematical optimization; Flow shop scheduling; Minification; Computer science; Scheduling (production processes); Job shop scheduling; Genetic algorithm; Retard; Due date; Function (biology); Productivity; Operations research; Algorithm; Mathematics; Economics; Schedule; Chemistry","score_opus":0.014799037976350866,"score_gpt":0.235635089205393,"score_spread":0.22083605122904212,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225606115","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2723572,0.0011982522,0.7203127,0.00047762037,0.00015997834,0.00015418325,0.00032240144,0.00025908375,0.0047584428],"genre_scores_gemma":[0.91885865,0.0006000064,0.077087626,0.000074851996,0.000059541002,0.00013503473,0.00019396086,0.00006585788,0.0029243943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992046,0.0002741884,0.000046000387,0.00016212501,0.00016432059,0.00014882296],"domain_scores_gemma":[0.9991611,0.0004813593,0.00015818138,0.000029041656,0.00008210585,0.00008827222],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011480871,0.0009430543,0.0011186971,0.00049697916,0.0004991193,0.00078723335,0.000767691,0.00064648816,0.0009950887],"category_scores_gemma":[0.001642592,0.00067669584,0.0009936483,0.0005803331,0.00053782255,0.00080021285,0.0004943414,0.0006807363,0.00011887817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019726192,0.00007580693,0.00063761516,0.00020320155,0.000046272413,0.0002308382,0.000045439694,0.97896147,0.0036894386,0.0054104594,0.0005353569,0.009966823],"study_design_scores_gemma":[0.000033933353,0.00018313834,0.00055902934,0.000013381811,0.000027690076,0.00006676997,0.000027395496,0.9926806,0.0011043339,0.0048427065,0.00044908753,0.000011927914],"about_ca_topic_score_codex":0.004324261,"about_ca_topic_score_gemma":0.003299741,"teacher_disagreement_score":0.004324261,"about_ca_system_score_codex":0.0006382905,"about_ca_system_score_gemma":0.0014707687,"threshold_uncertainty_score":0.008598149},"labels":[],"label_agreement":null},{"id":"W4226087358","doi":"10.5267/j.jpm.2022.1.002","title":"Solution methods for the integrated permutation flowshop and vehicle routing problem","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Job shop scheduling; Permutation (music); Vehicle routing problem; Mathematical optimization; Greedy algorithm; Computer science; Schedule; Production (economics); Iterated local search; Routing (electronic design automation); Focus (optics); Integrated production; Iterated function; Integer (computer science); Mathematics; Metaheuristic","score_opus":0.022835914594224623,"score_gpt":0.30762415065814597,"score_spread":0.28478823606392134,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226087358","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053653563,0.0002908048,0.99088496,0.00012272407,0.00004181976,0.00008548162,0.00004032882,0.000090594585,0.0030780383],"genre_scores_gemma":[0.16052723,0.00066438527,0.83187646,0.00010750505,0.00011993284,0.0005623847,0.00022607221,0.00015908472,0.005756903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951816,0.00017998273,0.000022421644,0.0000875937,0.00012136687,0.00007042924],"domain_scores_gemma":[0.9990945,0.00064570724,0.000082988015,0.000032266034,0.00011054294,0.00003403581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010854463,0.0011460094,0.00077334547,0.000824923,0.0004769051,0.0009249934,0.0013345311,0.0013954,0.004880783],"category_scores_gemma":[0.0027711433,0.0006059957,0.0010128518,0.0009965275,0.00048942,0.0010982256,0.0012192485,0.0015062353,0.0005690221],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046241516,0.00007660056,0.00030167523,0.00017661878,0.000041905056,0.000062820545,0.0000695571,0.9075817,0.0009336698,0.02665922,0.0017497095,0.062300295],"study_design_scores_gemma":[0.000015647454,0.000021840879,0.000048441183,0.000011608533,0.0000062153663,0.00002079499,0.000021429574,0.9900473,0.00019862114,0.008328236,0.0012757635,0.00000409934],"about_ca_topic_score_codex":0.004392802,"about_ca_topic_score_gemma":0.0044049327,"teacher_disagreement_score":0.004880783,"about_ca_system_score_codex":0.00087297667,"about_ca_system_score_gemma":0.001955264,"threshold_uncertainty_score":0.016327858},"labels":[],"label_agreement":null},{"id":"W4226119945","doi":"10.5267/j.jpm.2022.3.002","title":"Green cost premium as the dynamics of project management practice: A critical review","year":2022,"lang":"en","type":"review","venue":"Journal of Project Management","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Globe; Business; Sustainability; Limiting; Empirical research; Process management; Best practice; Knowledge management; Computer science; Psychology; Management; Economics; Engineering","score_opus":0.05690222188209563,"score_gpt":0.389579237263246,"score_spread":0.33267701538115035,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226119945","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011365722,0.9940058,0.0006372873,0.0023712555,0.00036406124,0.00007412742,0.000030971394,0.0000049486316,0.0013749182],"genre_scores_gemma":[0.01689726,0.9806717,0.0010267406,0.00073045463,0.00028438927,0.00012551786,0.000035487195,0.000008742247,0.00021967854],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9873333,0.0053964197,0.0024356984,0.0012239234,0.0032476983,0.00036302858],"domain_scores_gemma":[0.86132795,0.11826541,0.0059685656,0.0013229413,0.012486411,0.0006287561],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017823394,0.0009698873,0.0018303172,0.012651302,0.0015789076,0.00742942,0.0019512251,0.0033678177,0.0027598946],"category_scores_gemma":[0.059395097,0.0009688381,0.0016769734,0.013166275,0.004116201,0.00693056,0.002446655,0.003324671,0.0004967355],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013210942,0.00012855727,0.0034612836,0.2095779,0.0005650358,0.00065924064,0.014120369,0.0009477294,0.00043730548,0.053431585,0.016978197,0.69956076],"study_design_scores_gemma":[0.000016528029,0.0002102149,0.010177474,0.4656948,0.0013255123,0.0017289869,0.015998993,0.0006378057,0.0006725029,0.014048152,0.48933688,0.00015221332],"about_ca_topic_score_codex":0.009351679,"about_ca_topic_score_gemma":0.011498243,"teacher_disagreement_score":0.017823394,"about_ca_system_score_codex":0.0095930565,"about_ca_system_score_gemma":0.020749783,"threshold_uncertainty_score":0.094260275},"labels":[],"label_agreement":null},{"id":"W4226391331","doi":"10.5267/j.jpm.2022.3.001","title":"Monte Carlo simulation in an elementary school building","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Statistic; Monte Carlo method; Profitability index; Attendance; Environmental economics; Poverty; Investment (military); Business; Risk analysis (engineering); Actuarial science; Computer science; Economics; Economic growth; Finance; Political science; Mathematics","score_opus":0.10604274151492117,"score_gpt":0.4274384001939014,"score_spread":0.32139565867898023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226391331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.265639,0.0011721104,0.66666585,0.0013218928,0.00018668274,0.00020463706,0.000512752,0.00047393597,0.06382312],"genre_scores_gemma":[0.9368805,0.0004946306,0.049831778,0.00012374122,0.000025946034,0.00020396324,0.00021874945,0.000044813325,0.012175864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926573,0.00041804166,0.00002148659,0.00007942881,0.00011117354,0.00010416235],"domain_scores_gemma":[0.9966048,0.0027609833,0.00017094433,0.000111768866,0.00023799679,0.00011355994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012974291,0.00031728065,0.00064806495,0.0006018985,0.00054575683,0.0012998626,0.0006181473,0.0011855667,0.0061164876],"category_scores_gemma":[0.004772291,0.00038239814,0.00066374254,0.0007538261,0.0009859749,0.00070048944,0.00072604907,0.0010013522,0.00037102998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003693891,0.000027323289,0.0010513653,0.000020845224,0.000016332933,0.000041176943,0.000038727965,0.9732146,0.00010739287,0.022387806,0.00031479145,0.002742683],"study_design_scores_gemma":[0.000009249891,0.000013244616,0.0002693852,0.000009002315,0.0000062867744,0.000009518572,0.000022289487,0.9891454,0.00007564009,0.00956808,0.00086626154,0.000005627104],"about_ca_topic_score_codex":0.02270064,"about_ca_topic_score_gemma":0.012832075,"teacher_disagreement_score":0.02270064,"about_ca_system_score_codex":0.0010115765,"about_ca_system_score_gemma":0.0015916115,"threshold_uncertainty_score":0.04513699},"labels":[],"label_agreement":null},{"id":"W4285105273","doi":"10.5267/j.jpm.2022.5.003","title":"Modeling of organizing function management in Vietnam’s public construction works","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Knowledge management; Function (biology); Structural equation modeling; Authorization; Work (physics); Process management; Computer science; Business; Engineering; Machine learning","score_opus":0.09507896889605932,"score_gpt":0.3343438774042073,"score_spread":0.23926490850814797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285105273","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94471943,0.00024232232,0.036254816,0.00053584244,0.000022198787,0.0001407069,0.0002471135,0.000070376715,0.017767191],"genre_scores_gemma":[0.9937603,0.00019034746,0.0030591858,0.000009333122,0.0000051951106,0.00008292026,0.0000967312,0.000008989024,0.0027869828],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994979,0.0002185818,0.000019482839,0.000080943944,0.000063829764,0.00011917773],"domain_scores_gemma":[0.9993543,0.00033533695,0.00010821579,0.000020780939,0.000090665664,0.000090731926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009907235,0.0004834655,0.00027931583,0.000920857,0.0007024723,0.001925509,0.0009871908,0.0006464759,0.003188278],"category_scores_gemma":[0.001329634,0.00033773284,0.00048761445,0.00073990424,0.00061386696,0.000752627,0.0007497093,0.0004943909,0.00020322496],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012419293,0.0005656283,0.12225707,0.00018244874,0.00010368853,0.0012033139,0.005342373,0.8003968,0.0015168181,0.044591144,0.0017021856,0.0220144],"study_design_scores_gemma":[0.000013947499,0.00008732546,0.021200046,0.000038646955,0.000026105163,0.000057540925,0.0022928473,0.9703447,0.00017331252,0.003391113,0.002357149,0.000017276392],"about_ca_topic_score_codex":0.065721124,"about_ca_topic_score_gemma":0.040926524,"teacher_disagreement_score":0.065721124,"about_ca_system_score_codex":0.0028465742,"about_ca_system_score_gemma":0.0038096283,"threshold_uncertainty_score":0.13067716},"labels":[],"label_agreement":null},{"id":"W4285137993","doi":"10.5267/j.jpm.2022.5.001","title":"Critical success factors for international development projects in Afghanistan: An exploratory factor analysis","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Supply Chain Resilience and Risk Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Critical success factor; Exploratory factor analysis; Ranking (information retrieval); Exploratory research; Knowledge management; Population; Process management; Psychology; Operations management; Business; Engineering; Marketing; Computer science; Medicine; Environmental health; Sociology","score_opus":0.04458720144299115,"score_gpt":0.31397068807916695,"score_spread":0.2693834866361758,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285137993","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9967147,0.000055214936,0.0013373884,0.00014366957,0.000005811281,0.00023132087,0.00015461816,0.0000106440275,0.0013467175],"genre_scores_gemma":[0.9965461,0.0000685093,0.002634272,0.000016135964,0.0000045292136,0.00033086137,0.00016553538,0.0000039217266,0.0002301295],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99692184,0.0010894324,0.0003587739,0.00022498223,0.00096946215,0.00043545887],"domain_scores_gemma":[0.9846757,0.008963714,0.0022770655,0.0005714602,0.002773805,0.0007382778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073205745,0.0007274238,0.000498172,0.0048457547,0.0014658539,0.002345096,0.00033355405,0.00037329743,0.0017409737],"category_scores_gemma":[0.017357048,0.00030944357,0.0008914031,0.0039097006,0.001033397,0.0013331764,0.0015139335,0.0007152161,0.00018592043],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019424896,0.0004192676,0.8440243,0.00035476772,0.00015213821,0.00041948096,0.044515055,0.0008274633,0.0015290257,0.0019005556,0.0011188699,0.104544915],"study_design_scores_gemma":[0.000019910845,0.00048812263,0.9158633,0.00027445972,0.00007361665,0.00027584366,0.07346584,0.0030432497,0.0009071508,0.0012484082,0.0042842086,0.000055986122],"about_ca_topic_score_codex":0.0044192444,"about_ca_topic_score_gemma":0.0043901056,"teacher_disagreement_score":0.0073205745,"about_ca_system_score_codex":0.00179402,"about_ca_system_score_gemma":0.004959305,"threshold_uncertainty_score":0.038715303},"labels":[],"label_agreement":null},{"id":"W4285151935","doi":"10.5267/j.jpm.2022.5.002","title":"A hybrid genetic algorithm for the hybrid flow shop scheduling problem with machine blocking and sequence-dependent setup times","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Job shop scheduling; Mathematical optimization; GRASP; Flow shop scheduling; Computer science; Sequence (biology); Genetic algorithm; Metaheuristic; Blocking (statistics); Algorithm; Integer programming; Scheduling (production processes); Mathematics; Routing (electronic design automation)","score_opus":0.013193968955826195,"score_gpt":0.2313020202296604,"score_spread":0.2181080512738342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285151935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019293044,0.00013792825,0.97800475,0.00009612308,0.000030846004,0.000066752786,0.00002584038,0.00025096798,0.00209363],"genre_scores_gemma":[0.30486286,0.0002175661,0.6915534,0.000120595454,0.000036100333,0.00036696802,0.0001408381,0.000086114465,0.0026156171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966204,0.00011924243,0.000011377775,0.000059168728,0.00010035523,0.000047870115],"domain_scores_gemma":[0.9996847,0.00019181817,0.000032100303,0.000017171094,0.00005073997,0.000023517086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007534526,0.0007162368,0.00071365794,0.0008779629,0.0004466469,0.0007574413,0.0011561888,0.001369945,0.001688535],"category_scores_gemma":[0.0012144552,0.00039828997,0.0007494975,0.00097113656,0.0005242177,0.000668978,0.00075676624,0.0008161888,0.00029231134],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047066154,0.000052645133,0.00035295007,0.000041341184,0.000039738476,0.000059341764,0.00004660685,0.94013506,0.0019828635,0.008350616,0.0006818444,0.04820989],"study_design_scores_gemma":[0.000014970267,0.00003155017,0.000052129726,0.0000037370637,0.0000065973823,0.000018199442,0.000006565247,0.9976065,0.00020920607,0.0015959197,0.0004507667,0.000003851149],"about_ca_topic_score_codex":0.0042180326,"about_ca_topic_score_gemma":0.0035835686,"teacher_disagreement_score":0.0042180326,"about_ca_system_score_codex":0.0006222062,"about_ca_system_score_gemma":0.0013350912,"threshold_uncertainty_score":0.00838697},"labels":[],"label_agreement":null},{"id":"W4285247682","doi":"10.5267/j.jpm.2022.3.003","title":"A survey of scheduling problems with uncertain interval/bounded processing/setup times","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bounded function; Scheduling (production processes); Computer science; Upper and lower bounds; Job shop scheduling; Mathematical optimization; Interval (graph theory); Random variable; Mathematics; Statistics; Schedule","score_opus":0.027935214651590552,"score_gpt":0.26081166058818583,"score_spread":0.2328764459365953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285247682","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024274163,0.25546235,0.6967901,0.0019589493,0.0009210246,0.00016796426,0.0006211718,0.0003118852,0.01949242],"genre_scores_gemma":[0.2559231,0.43160653,0.29711384,0.00069945795,0.0035764647,0.00033462927,0.00185108,0.00023381271,0.008661044],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986524,0.0004254758,0.00014967917,0.00026827998,0.00040083888,0.000103434606],"domain_scores_gemma":[0.998669,0.00091933407,0.00012839313,0.000064663276,0.0001747326,0.00004385738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013794616,0.0012428765,0.0013570614,0.0012314515,0.00062523194,0.0016416166,0.0012213953,0.0012696867,0.002002405],"category_scores_gemma":[0.0026404446,0.0006686612,0.0012450627,0.0046019233,0.0004692531,0.0018500612,0.000543919,0.0012129113,0.0007302883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030918533,0.00028357992,0.0030099682,0.0071851616,0.00024324017,0.0004268082,0.0003065831,0.36213902,0.004460571,0.09531225,0.016504213,0.5098193],"study_design_scores_gemma":[0.00006963351,0.00061224954,0.0043901606,0.0014184992,0.00022235079,0.0013675661,0.00044868398,0.65330046,0.002509464,0.15324588,0.18229613,0.00011882815],"about_ca_topic_score_codex":0.0015694392,"about_ca_topic_score_gemma":0.0009475044,"teacher_disagreement_score":0.002002405,"about_ca_system_score_codex":0.0008183889,"about_ca_system_score_gemma":0.0013585861,"threshold_uncertainty_score":0.00729537},"labels":[],"label_agreement":null},{"id":"W4285252923","doi":"10.5267/j.jpm.2022.4.002","title":"A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Successor cardinal; Flow shop scheduling; Computer science; Job shop scheduling; Job shop; Mathematical optimization; Scheduling (production processes); Operations research; Industrial engineering; Schedule; Mathematics; Engineering","score_opus":0.005536354206269567,"score_gpt":0.20026662142706603,"score_spread":0.19473026722079645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285252923","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07994027,0.0008045739,0.90985346,0.00047282875,0.0002704443,0.00039912187,0.0011387378,0.00033033616,0.006790195],"genre_scores_gemma":[0.4888469,0.0014946852,0.49952945,0.0001719328,0.00022013379,0.0005762027,0.001508197,0.00013074889,0.007521776],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991115,0.00029600487,0.000064949454,0.00024170183,0.00016341812,0.0001224473],"domain_scores_gemma":[0.99910444,0.00059083104,0.00010270864,0.000046049852,0.00007783325,0.000078244964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011741488,0.0015161191,0.001218282,0.00091681717,0.0009177348,0.0010896978,0.0010916824,0.0017175088,0.0029533205],"category_scores_gemma":[0.0019835162,0.0005734652,0.001247404,0.002218979,0.0005296963,0.0010730027,0.00063625217,0.00095944694,0.00031872067],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023740552,0.0002874276,0.0014518449,0.00088724704,0.00012257918,0.0014283782,0.00015732394,0.88177055,0.011091127,0.027643476,0.0038837085,0.07103895],"study_design_scores_gemma":[0.00007280925,0.00023633207,0.0009163908,0.000032341093,0.0000484696,0.00060859096,0.0000783566,0.96806425,0.0021208818,0.022510074,0.005277691,0.000033810204],"about_ca_topic_score_codex":0.004623598,"about_ca_topic_score_gemma":0.0033785836,"teacher_disagreement_score":0.004623598,"about_ca_system_score_codex":0.00061957934,"about_ca_system_score_gemma":0.0023612203,"threshold_uncertainty_score":0.0098798275},"labels":[],"label_agreement":null},{"id":"W4285291624","doi":"10.5267/j.jpm.2022.4.001","title":"Aircraft total turnaround time estimation using fuzzy critical path method","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Reliability and Maintenance Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Turnaround time; Fuzzy logic; Randomness; Fuzzy set; Computer science; Critical path method; Mathematical optimization; Operations research; Mathematics; Statistics; Engineering; Artificial intelligence","score_opus":0.012617472228050394,"score_gpt":0.28349910351432445,"score_spread":0.27088163128627407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285291624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2004927,0.00025908428,0.7971563,0.00004384465,0.000020492313,0.000081313214,0.000148941,0.00037329615,0.0014240555],"genre_scores_gemma":[0.8973101,0.000105601874,0.102020346,0.000008719096,0.000009936696,0.000057210706,0.00013762931,0.000023697658,0.00032674024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994467,0.000116649615,0.000034755583,0.0001589271,0.0001844902,0.000058471138],"domain_scores_gemma":[0.9969303,0.0018110235,0.0004696042,0.00010583784,0.0006155116,0.00006784431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011519772,0.0007328909,0.00042888965,0.0035084763,0.00044188494,0.0006738173,0.00064201024,0.0005797131,0.0011172397],"category_scores_gemma":[0.004496023,0.000288817,0.00071955356,0.0013207054,0.00030488407,0.0008205049,0.00031388536,0.00047283032,0.00014092152],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018918466,0.000058149653,0.012830801,0.00010665493,0.00006753923,0.0001438079,0.00017896823,0.8866393,0.0067637335,0.0038947866,0.00047155604,0.088655524],"study_design_scores_gemma":[0.000004854219,0.000040919662,0.0022733188,0.000008257745,0.00001135297,0.000037590657,0.00002474772,0.9941673,0.0017208157,0.0014706949,0.00022554869,0.000014501378],"about_ca_topic_score_codex":0.010859348,"about_ca_topic_score_gemma":0.004201382,"teacher_disagreement_score":0.010859348,"about_ca_system_score_codex":0.0009188639,"about_ca_system_score_gemma":0.0009207811,"threshold_uncertainty_score":0.02159226},"labels":[],"label_agreement":null},{"id":"W4307865551","doi":"10.5267/j.jpm.2022.10.001","title":"Development of a robust multi-objective model for green capacitated location-routing under crisis conditions","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sorting; Computer science; Mathematical optimization; Genetic algorithm; Operations research; Supply chain network; Supply chain; Set (abstract data type); Reliability (semiconductor); Routing (electronic design automation); Integer programming; Vehicle routing problem; Robust optimization; Facility location problem; Linear programming; Network planning and design; Supply chain management; Engineering; Business; Mathematics; Algorithm","score_opus":0.07756697463210986,"score_gpt":0.3183241950681378,"score_spread":0.24075722043602793,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307865551","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012997223,0.0003446035,0.97590387,0.00034275727,0.00005445113,0.00009770137,0.00026509046,0.00021063242,0.009783605],"genre_scores_gemma":[0.8208396,0.0007575638,0.16383412,0.0001761628,0.00006512556,0.0007985764,0.00052613317,0.00016079488,0.0128418645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939334,0.00021229894,0.0000251003,0.00012377491,0.00013401115,0.000111403635],"domain_scores_gemma":[0.9992901,0.00036221786,0.00012498406,0.000028899462,0.00014785105,0.00004598827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013617954,0.001213492,0.0013329985,0.0008471645,0.00052598125,0.0018667262,0.0020839125,0.002232748,0.0037637649],"category_scores_gemma":[0.002081427,0.0009234687,0.0015675095,0.00083395396,0.0008110938,0.0011310467,0.0014484974,0.0018253503,0.0005015212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064799087,0.0000059413555,0.00005012061,0.00001192438,0.0000074844793,0.000025943971,0.000006882779,0.9966582,0.00013567261,0.0022111014,0.00010597093,0.0007742599],"study_design_scores_gemma":[0.0000020785087,0.0000066698717,0.000019842324,0.0000024324252,0.0000031339414,0.0000034072768,0.0000038848584,0.999057,0.00004538472,0.0007016702,0.00015233026,0.0000022486472],"about_ca_topic_score_codex":0.014498681,"about_ca_topic_score_gemma":0.009151782,"teacher_disagreement_score":0.014498681,"about_ca_system_score_codex":0.0016320741,"about_ca_system_score_gemma":0.0021577945,"threshold_uncertainty_score":0.028828561},"labels":[],"label_agreement":null},{"id":"W4307865591","doi":"10.5267/j.jpm.2022.8.002","title":"An ordered precedence constrained flow shop scheduling problem with machine specific preventive maintenance","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Preventive maintenance; Tardiness; Flow shop scheduling; Interrupt; Computer science; Scheduling (production processes); Job shop scheduling; Schedule; Operations research; Reliability engineering; Mathematical optimization; Engineering; Mathematics","score_opus":0.010330230904789586,"score_gpt":0.23118104262982594,"score_spread":0.22085081172503634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307865591","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22874293,0.0012550046,0.75575614,0.00096935313,0.00027094776,0.00059759826,0.0013005182,0.00040086772,0.010706717],"genre_scores_gemma":[0.7965544,0.00074995804,0.19576345,0.0001036139,0.0001361605,0.00034373143,0.00085195893,0.0000611357,0.0054356274],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99889034,0.00043157095,0.00006238193,0.00025612983,0.00015950685,0.00020002748],"domain_scores_gemma":[0.9989693,0.0006575241,0.00013855669,0.000049670165,0.00007500852,0.000109947614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012512411,0.0011941008,0.0015631,0.0006419916,0.00079845067,0.0010149626,0.0012746213,0.0015276312,0.0032005645],"category_scores_gemma":[0.0019796009,0.0006379517,0.0009932696,0.0013528687,0.0005598934,0.0010339578,0.0006075019,0.0008241707,0.00022387461],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026602217,0.00018452668,0.0006511732,0.00041859545,0.00007126884,0.0007770005,0.00009751863,0.9606795,0.0024767031,0.011085088,0.0014537739,0.021839024],"study_design_scores_gemma":[0.00008655507,0.00023099847,0.00048787252,0.00001704029,0.00003465706,0.00022449177,0.000054418484,0.98736703,0.0006428749,0.0093215965,0.0015166271,0.000015844067],"about_ca_topic_score_codex":0.005492954,"about_ca_topic_score_gemma":0.0042131725,"teacher_disagreement_score":0.005492954,"about_ca_system_score_codex":0.00086396426,"about_ca_system_score_gemma":0.0023060103,"threshold_uncertainty_score":0.010921955},"labels":[],"label_agreement":null},{"id":"W4307865779","doi":"10.5267/j.jpm.2022.8.001","title":"Ex-ante project management for disruptive product innovation: A review","year":2022,"lang":"en","type":"review","venue":"Journal of Project Management","topic":"Innovation Diffusion and Forecasting","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Disruptive innovation; Disruptive technology; Ex-ante; Innovation management; Product innovation; Product (mathematics); New product development; Argument (complex analysis); Business; Knowledge management; Marketing; Economics; Computer science; Engineering","score_opus":0.4227722759023259,"score_gpt":0.5150860692434194,"score_spread":0.09231379334109346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307865779","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0001640899,0.9990062,0.00019015092,0.00015084296,0.000053030602,0.0000069694747,0.0000082113675,0.0000023349314,0.00041812763],"genre_scores_gemma":[0.0013422356,0.99829155,0.00019374302,0.00005478716,0.000048936974,0.000007330601,0.000008608743,8.339556e-7,0.0000519243],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987255,0.00036208413,0.00025583338,0.0002108253,0.0003976961,0.000048035305],"domain_scores_gemma":[0.98959166,0.008430959,0.00094248215,0.0001410508,0.0007753749,0.00011845395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028191346,0.000930355,0.0015276298,0.003809042,0.00042632065,0.0017420241,0.0012786491,0.0015879468,0.0029181936],"category_scores_gemma":[0.0073588733,0.0005334693,0.0011163045,0.005119754,0.0008584289,0.00242462,0.0006999256,0.0011460683,0.0005878617],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055064254,0.000093054616,0.0005762282,0.09223378,0.00028466675,0.00014133802,0.00018876359,0.0006413483,0.00041772772,0.0058380594,0.0057248734,0.89380515],"study_design_scores_gemma":[0.000042473235,0.0005128965,0.0065572876,0.11545966,0.0017311174,0.0021338237,0.0006203039,0.00073862413,0.001378373,0.007522637,0.86319715,0.000105641135],"about_ca_topic_score_codex":0.0020933722,"about_ca_topic_score_gemma":0.0032253787,"teacher_disagreement_score":0.003809042,"about_ca_system_score_codex":0.0010431554,"about_ca_system_score_gemma":0.003869523,"threshold_uncertainty_score":0.014909208},"labels":[],"label_agreement":null},{"id":"W4307866242","doi":"10.5267/j.jpm.2022.8.003","title":"Investigation and ranking the causes of delay in EPC projects of nonindustrial buildings of 9, 10, 19, 20 and 21 phases of South Pars of Iran","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Brainstorming; Economic shortage; Ranking (information retrieval); Descriptive statistics; Delphi; Delphi method; Duration (music); Business; Process (computing); Operations management; Actuarial science; Computer science; Marketing; Economics; Statistics; Mathematics","score_opus":0.1645867307893322,"score_gpt":0.3509329581209643,"score_spread":0.1863462273316321,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307866242","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976616,0.00015047839,0.000555153,0.00020818804,0.000007815435,0.000047138907,0.000071811926,0.000005726539,0.0012920409],"genre_scores_gemma":[0.9989021,0.00017497466,0.0004503155,0.000009800537,0.0000050430804,0.000015020332,0.000060521495,0.0000021454277,0.00038012568],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99658835,0.00052291283,0.00043311826,0.0002231431,0.0014696192,0.00076289143],"domain_scores_gemma":[0.98321724,0.004463872,0.007460643,0.00031819553,0.0033744047,0.0011655337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024642574,0.00035312187,0.00021074817,0.0031729455,0.0013116441,0.0011767655,0.000756626,0.0005754903,0.002344768],"category_scores_gemma":[0.012631578,0.0003422949,0.00034704196,0.0027692849,0.00056869024,0.0010921723,0.0011098186,0.0007604542,0.00018659813],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014452593,0.00019894291,0.93469185,0.0002827115,0.00003374412,0.0019645349,0.011911308,0.0014099721,0.0013755453,0.0015147898,0.000984413,0.045487642],"study_design_scores_gemma":[0.000006597327,0.00024080809,0.92611134,0.000108070446,0.00003287828,0.0012135158,0.062444076,0.0025743018,0.0010643353,0.00059981993,0.005563709,0.00004061227],"about_ca_topic_score_codex":0.009578886,"about_ca_topic_score_gemma":0.014677584,"teacher_disagreement_score":0.009578886,"about_ca_system_score_codex":0.0026553303,"about_ca_system_score_gemma":0.0045164316,"threshold_uncertainty_score":0.01926583},"labels":[],"label_agreement":null},{"id":"W4307866551","doi":"10.5267/j.jpm.2022.7.001","title":"Exploring the influence of information and communication technology (ICT) on construction supply chain management: Empirical evidence from a construction project’s perspective","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information and Communications Technology; Empirical research; Structural equation modeling; Business; Knowledge management; Supply chain management; Supply chain; Empirical evidence; Government (linguistics); Sample (material); Industrial organization; Process management; Computer science; Marketing; Mathematics","score_opus":0.15743625132387865,"score_gpt":0.366883141324253,"score_spread":0.20944689000037434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307866551","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99133015,0.00068185857,0.0005915244,0.00032185446,0.0000031590835,0.000031419026,0.000018598936,0.0000017858835,0.0070195943],"genre_scores_gemma":[0.99770975,0.0014735274,0.0003987032,0.000026733353,0.0000025449017,0.000014770518,0.000019801588,0.0000011506839,0.0003529858],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9972692,0.0015534242,0.00015601689,0.00013809603,0.00060768944,0.0002755718],"domain_scores_gemma":[0.9612602,0.029494897,0.0051800534,0.0006720158,0.002616428,0.0007763288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037009001,0.00024002626,0.00017302996,0.0020994642,0.0011314799,0.0024151294,0.00035942436,0.0005789602,0.0023875658],"category_scores_gemma":[0.015781464,0.00030830427,0.00021043737,0.0033429053,0.0016080928,0.0019855052,0.0015602317,0.0006329918,0.0002218898],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023366326,0.00096456765,0.78386396,0.0016797734,0.0001154287,0.0025690473,0.05357098,0.0032152624,0.001785315,0.012454785,0.00065670494,0.13889043],"study_design_scores_gemma":[0.00002611321,0.0009720253,0.70525724,0.0027905633,0.00021888087,0.001073572,0.26402256,0.006099968,0.0022424827,0.0034522915,0.013796227,0.000048140704],"about_ca_topic_score_codex":0.005965467,"about_ca_topic_score_gemma":0.010841144,"teacher_disagreement_score":0.005965467,"about_ca_system_score_codex":0.0014995693,"about_ca_system_score_gemma":0.0039390107,"threshold_uncertainty_score":0.019572437},"labels":[],"label_agreement":null},{"id":"W4307866638","doi":"10.5267/j.jpm.2022.9.001","title":"A risk management model for large projects in the construction phase in Egypt","year":2022,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk analysis (engineering); Risk management; Process (computing); Sustainability; Pre-construction services; Project risk management; Risk assessment; Business; Risk management framework; Engineering; Project management; Process management; Intervention (counseling); Environmental resource management; IT risk management; Project management triangle; Computer science; Systems engineering; Finance; Economics","score_opus":0.10103985600494249,"score_gpt":0.4023554136697534,"score_spread":0.30131555766481094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307866638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.471214,0.0014509525,0.43044287,0.0056030927,0.00014439758,0.0006480737,0.0009224394,0.00045262944,0.089121595],"genre_scores_gemma":[0.938845,0.0007993007,0.02897699,0.000106477004,0.000044898854,0.0005674059,0.0002881684,0.0000619434,0.030309929],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988231,0.00049297407,0.00006818139,0.00017340768,0.00014981357,0.00029245653],"domain_scores_gemma":[0.99760157,0.0013014495,0.0003256464,0.000049224927,0.00048788163,0.00023430906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027133282,0.0011809028,0.00082027086,0.0016572989,0.0017867424,0.004388693,0.0026801967,0.0034481792,0.011539065],"category_scores_gemma":[0.004147799,0.000865887,0.0013647433,0.0010202607,0.0012992003,0.0024152212,0.0022940333,0.0020492822,0.00080811203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008027389,0.0001207685,0.0021099735,0.00006825457,0.000039402108,0.00050104555,0.0006808466,0.93921065,0.00039684965,0.050943024,0.0008253922,0.0050234236],"study_design_scores_gemma":[0.000027802116,0.000043654396,0.00044658847,0.000024839368,0.000028290639,0.00005572359,0.00038503,0.9870432,0.0000757887,0.0106613,0.0011900613,0.000017680983],"about_ca_topic_score_codex":0.042259187,"about_ca_topic_score_gemma":0.019713985,"teacher_disagreement_score":0.042259187,"about_ca_system_score_codex":0.005231402,"about_ca_system_score_gemma":0.004247123,"threshold_uncertainty_score":0.084026396},"labels":[],"label_agreement":null},{"id":"W4317725390","doi":"10.5267/j.jpm.2022.12.001","title":"Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Job shop scheduling; Bounded function; Mathematical optimization; Computer science; Minification; Dynamic programming; Sequence (biology); Scheduling (production processes); Limit (mathematics); Blocking (statistics); Flow shop scheduling; Linear programming; Algorithm; Mathematics; Schedule","score_opus":0.021729000666331207,"score_gpt":0.2639030284277405,"score_spread":0.24217402776140928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317725390","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007724281,0.00016043789,0.99032974,0.00011026389,0.00002548563,0.000047470785,0.000031371936,0.00012754048,0.0014433663],"genre_scores_gemma":[0.34031492,0.00057457626,0.655216,0.00012495124,0.000055521763,0.0003969413,0.00019808687,0.0001870692,0.0029319446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944514,0.00022038457,0.000018338193,0.000081114165,0.00014471254,0.000090240246],"domain_scores_gemma":[0.9994931,0.00033178888,0.00004911573,0.000021114585,0.000059268732,0.00004563043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000964418,0.0009947167,0.00089859887,0.00064241304,0.0004847957,0.0007473308,0.0013014216,0.0007647408,0.002441256],"category_scores_gemma":[0.0017162904,0.00056549476,0.0007533158,0.00080383423,0.00054856157,0.00079433253,0.0007303586,0.0013254106,0.00026735305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041422154,0.000048919297,0.00014920106,0.00011321601,0.000029232979,0.000038780403,0.000036002508,0.9650856,0.0018971529,0.010958323,0.0006192418,0.020982886],"study_design_scores_gemma":[0.0000072278876,0.00003137212,0.0000412041,0.000005952158,0.0000047567746,0.000013034004,0.000008238808,0.9948547,0.00044828138,0.0041114334,0.0004705145,0.0000032691244],"about_ca_topic_score_codex":0.0038568475,"about_ca_topic_score_gemma":0.0035782957,"teacher_disagreement_score":0.0038568475,"about_ca_system_score_codex":0.00074334507,"about_ca_system_score_gemma":0.0022193221,"threshold_uncertainty_score":0.00816679},"labels":[],"label_agreement":null},{"id":"W4317725405","doi":"10.5267/j.jpm.2023.1.001","title":"Review of the hemp-based brick that purifies air pollution, reduces humidity and is a thermal insulator: An innovative solution to reduce environmental pollution in the construction industry","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Social Skills and Education","field":"Social Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Brick; Architectural engineering; Environmental science; Environmentally friendly; Pollution; Civil engineering; Environmental pollution; Scopus; Engineering; Environmental engineering; Business; Environmental economics; Environmental protection; Ecology","score_opus":0.05016346005516493,"score_gpt":0.34853666014143325,"score_spread":0.29837320008626833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317725405","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015026274,0.9932833,0.00024982946,0.0008308595,0.0005338208,0.000048345817,0.00020675536,0.0000110319215,0.003333518],"genre_scores_gemma":[0.0061420784,0.9920242,0.00038270527,0.00030628816,0.00022611578,0.00003106088,0.00015275586,0.0000038015146,0.0007309437],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985922,0.00029687668,0.00040964334,0.000117196345,0.00052644766,0.00005768532],"domain_scores_gemma":[0.99527586,0.0023787364,0.00082182244,0.00008532274,0.0013142545,0.0001240125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012648423,0.00061871606,0.0012263656,0.011061885,0.00046083977,0.0018040395,0.00073233095,0.0007721757,0.005274995],"category_scores_gemma":[0.0055693733,0.00024822276,0.0010392141,0.015294242,0.00045715226,0.001611721,0.0004885,0.000461886,0.000689957],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013582916,0.00008391479,0.00090531487,0.48612225,0.00073079666,0.00038620504,0.00086928374,0.0003228894,0.002157476,0.0048153754,0.036587432,0.4668832],"study_design_scores_gemma":[0.0000219578,0.0002591436,0.009942495,0.21393463,0.0029164641,0.0012469542,0.0010885975,0.0001825046,0.0013498826,0.0017638005,0.7672525,0.000041125124],"about_ca_topic_score_codex":0.0052825343,"about_ca_topic_score_gemma":0.00984068,"teacher_disagreement_score":0.011061885,"about_ca_system_score_codex":0.0013622299,"about_ca_system_score_gemma":0.0068448153,"threshold_uncertainty_score":0.017646551},"labels":[],"label_agreement":null},{"id":"W4317725409","doi":"10.5267/j.jpm.2022.11.002","title":"Structural equation modeling of critical success factors in the programs of development regional","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Sustainability and Innovation in Business","field":"Business, Management and Accounting","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Structural equation modeling; Cronbach's alpha; Process management; Computer science; Path analysis (statistics); Reliability (semiconductor); Critical success factor; Operations management; Operations research; Management science; Mathematics; Knowledge management; Business; Engineering; Statistics; Psychometrics; Physics","score_opus":0.12630874163648592,"score_gpt":0.3265631107660626,"score_spread":0.20025436912957667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317725409","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9193224,0.0004596096,0.06613088,0.001109767,0.000068028,0.002553909,0.0019957877,0.00021010348,0.008149545],"genre_scores_gemma":[0.9620058,0.00033531277,0.031952593,0.000047453268,0.00001427964,0.0027531004,0.0011596407,0.000022362854,0.001709368],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9949532,0.002878362,0.00037106115,0.0005356712,0.0008607149,0.00040097488],"domain_scores_gemma":[0.98912805,0.007501512,0.0012633373,0.00032925807,0.0015807416,0.00019711006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008394191,0.0011589493,0.0009618775,0.0047873887,0.0008995874,0.0019764672,0.0012774409,0.0008059538,0.006006561],"category_scores_gemma":[0.016949274,0.00066071,0.002732293,0.004518956,0.0009184294,0.0014166685,0.0020303822,0.0016094283,0.00044686155],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005353574,0.0018511702,0.6512399,0.0019395776,0.0020747106,0.0010382,0.02888475,0.078683965,0.0025162396,0.063172854,0.0047599124,0.16330339],"study_design_scores_gemma":[0.00029337747,0.00246753,0.41386497,0.0017849695,0.0016960847,0.0004899677,0.023733139,0.50471586,0.0027828855,0.032266572,0.015687514,0.00021716696],"about_ca_topic_score_codex":0.014434476,"about_ca_topic_score_gemma":0.011728986,"teacher_disagreement_score":0.014434476,"about_ca_system_score_codex":0.0031579034,"about_ca_system_score_gemma":0.008523512,"threshold_uncertainty_score":0.0443933},"labels":[],"label_agreement":null},{"id":"W4317725423","doi":"10.5267/j.jpm.2022.12.002","title":"Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Business, Innovation, and Economy","field":"Economics, Econometrics and Finance","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Durability; Scale (ratio); Scopus; Photocatalysis; Capital city; Process (computing); Environmental pollution; Civil engineering; Environmental science; Computer science; Architectural engineering; Construction engineering; Engineering; Environmental protection; Database; Geography; Political science","score_opus":0.026175882809425486,"score_gpt":0.2672154278432635,"score_spread":0.24103954503383804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317725423","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016758268,0.99414825,0.0002844776,0.00044064282,0.00028555916,0.00005754088,0.0003125147,0.000017265029,0.0027778728],"genre_scores_gemma":[0.0064988574,0.9918373,0.00047916072,0.00021213238,0.00013412557,0.000048759604,0.00023326842,0.000007829121,0.00054868637],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984397,0.0003324544,0.0005392096,0.00013961863,0.000487316,0.000061759536],"domain_scores_gemma":[0.9943831,0.003274505,0.00091465685,0.00012183225,0.0012154438,0.00009053122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015442873,0.0007694374,0.001431494,0.013660741,0.00050322094,0.0020108894,0.00065177307,0.0007436636,0.006127042],"category_scores_gemma":[0.0062949704,0.0003768106,0.0015876377,0.015427644,0.00042796746,0.001521846,0.0007539716,0.0004990422,0.00070449425],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121207624,0.00005697603,0.0010582724,0.53735167,0.0011260854,0.00043012382,0.0011752322,0.0003149339,0.0024336972,0.002048545,0.015611549,0.43827173],"study_design_scores_gemma":[0.000027385784,0.000337772,0.01377097,0.27468663,0.0062673236,0.0011534827,0.0014503576,0.0001709388,0.002252025,0.0012085818,0.6986207,0.00005385018],"about_ca_topic_score_codex":0.0054227808,"about_ca_topic_score_gemma":0.011546644,"teacher_disagreement_score":0.013660741,"about_ca_system_score_codex":0.0012652875,"about_ca_system_score_gemma":0.0060150228,"threshold_uncertainty_score":0.020496964},"labels":[],"label_agreement":null},{"id":"W4320018778","doi":"10.5267/j.jpm.2022.11.001","title":"The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Community-based Tourism Development and Sustainability","field":"Social Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Tourism; Sustainability; Ecotourism; Tourism geography; Sustainable tourism; Business; Geography; Sustainable development; Economic growth; Environmental resource management; Environmental planning; Political science; Economics; Ecology","score_opus":0.013921894019765218,"score_gpt":0.32673138382133277,"score_spread":0.31280948980156753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320018778","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9919817,0.000051722473,0.00021726439,0.0001608834,0.0000098538085,0.00016153557,0.00005449536,0.000012025874,0.007350475],"genre_scores_gemma":[0.9979808,0.000065082684,0.00044124544,0.000021784754,0.0000040941513,0.00011873418,0.00004144726,0.0000023508917,0.0013245805],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9966427,0.0024789334,0.00008518851,0.00009407377,0.00034895522,0.00035016637],"domain_scores_gemma":[0.9914773,0.0039386856,0.00071173476,0.0002374414,0.00081901305,0.0028158773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033001362,0.00020469479,0.00016683801,0.0005214884,0.00073611387,0.00066409376,0.0002851594,0.00025105392,0.0048607606],"category_scores_gemma":[0.009575023,0.00010955266,0.00031480571,0.000500302,0.0005435106,0.00047674667,0.0015780885,0.00046191944,0.00029880533],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006009979,0.018143378,0.48396897,0.001025641,0.00028624,0.0019278586,0.0117132375,0.007933907,0.006738346,0.00361886,0.007829951,0.45080373],"study_design_scores_gemma":[0.00024438254,0.011287846,0.96218294,0.00013259545,0.00012570909,0.00018609739,0.011013306,0.0026648338,0.0023911449,0.0006099693,0.009127574,0.000033651973],"about_ca_topic_score_codex":0.0022073362,"about_ca_topic_score_gemma":0.0040077134,"teacher_disagreement_score":0.0048607606,"about_ca_system_score_codex":0.0005724764,"about_ca_system_score_gemma":0.00176723,"threshold_uncertainty_score":0.017452955},"labels":[],"label_agreement":null},{"id":"W4366808569","doi":"10.5267/j.jpm.2023.2.001","title":"A robust solution for optimizing facility location and network design with diverse link capacities","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Facility Location and Emergency Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Simulated annealing; Suite; Computer science; Mathematical optimization; Facility location problem; Network planning and design; Heuristic; Robust optimization; Meta heuristic; Algorithm; Mathematics","score_opus":0.10705734885001986,"score_gpt":0.25502235577848426,"score_spread":0.1479650069284644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366808569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035675962,0.00011425745,0.99493897,0.00007525262,0.0000130016615,0.000027086397,0.000043746528,0.000071126495,0.001148954],"genre_scores_gemma":[0.2679427,0.0003796239,0.7280749,0.00008764219,0.00006789853,0.00034401772,0.00021239743,0.00010785644,0.0027830128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988796,0.00045971287,0.000036140944,0.000211289,0.00032655871,0.00008665653],"domain_scores_gemma":[0.9984211,0.0010816492,0.0002169405,0.00011038114,0.00013023986,0.000039677187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022193263,0.0011799757,0.0012377435,0.0011799582,0.0004659047,0.0012891281,0.0015588172,0.002179044,0.0027236664],"category_scores_gemma":[0.00563461,0.0010072778,0.001393306,0.0013255456,0.0007894619,0.0015066938,0.0011970585,0.0013340991,0.00037858682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008988358,0.000012870586,0.000049129998,0.000030996987,0.000016973434,0.000011637323,0.00000946586,0.9865085,0.0002973678,0.006529924,0.0001910393,0.0063330885],"study_design_scores_gemma":[0.000005611858,0.000028862189,0.000037281374,0.0000064374644,0.0000069788107,0.000011888714,0.0000070616875,0.995337,0.00023777747,0.0037497994,0.00056711154,0.00000421706],"about_ca_topic_score_codex":0.0031773432,"about_ca_topic_score_gemma":0.0031729166,"teacher_disagreement_score":0.0031773432,"about_ca_system_score_codex":0.0012280792,"about_ca_system_score_gemma":0.002197803,"threshold_uncertainty_score":0.011737049},"labels":[],"label_agreement":null},{"id":"W4366808570","doi":"10.5267/j.jpm.2023.3.001","title":"Credibility based chance constrained programming for parallel machine scheduling under linear deterioration and learning effects with considering setup times dependent on past sequences","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Optimization and Mathematical Programming","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Tardiness; Mathematical optimization; Job shop scheduling; Fuzzy logic; Pareto optimal; Computer science; Scheduling (production processes); Heuristic; Constraint (computer-aided design); Constraint programming; Pareto principle; Multi-objective optimization; Mathematics; Artificial intelligence","score_opus":0.022471793127047307,"score_gpt":0.2742429177143532,"score_spread":0.2517711245873059,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366808570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032145035,0.00060472736,0.9628105,0.0004798925,0.000072962575,0.00007665089,0.00008100504,0.00009097701,0.0036382824],"genre_scores_gemma":[0.90272593,0.0007811066,0.09129647,0.00009977827,0.0001000483,0.00023589795,0.00013953383,0.00006538534,0.0045557874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900335,0.00043323182,0.00003920556,0.00014218617,0.000246589,0.0001354211],"domain_scores_gemma":[0.996108,0.0030537578,0.00036540016,0.0000538547,0.00027955108,0.00013947015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024802855,0.0012926352,0.0016861879,0.0010024622,0.0005578046,0.0015501812,0.0012234232,0.0014223407,0.001686766],"category_scores_gemma":[0.0063367533,0.0008696147,0.0011703522,0.001310421,0.0011206949,0.0012458658,0.0011190093,0.001845901,0.00013690144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019141511,0.000006004756,0.000102164755,0.00002511803,0.000010696083,0.00003794464,0.000011784098,0.9947402,0.00013014626,0.0029545682,0.00009237125,0.0018699544],"study_design_scores_gemma":[0.0000020364755,0.0000073445203,0.00002816984,0.0000029316968,0.0000017525206,0.0000035082062,0.000002546563,0.9986754,0.000038088758,0.0011963982,0.000039764356,0.0000020054763],"about_ca_topic_score_codex":0.011271259,"about_ca_topic_score_gemma":0.0059007583,"teacher_disagreement_score":0.011271259,"about_ca_system_score_codex":0.001824157,"about_ca_system_score_gemma":0.002463477,"threshold_uncertainty_score":0.022411346},"labels":[],"label_agreement":null},{"id":"W4366808576","doi":"10.5267/j.jpm.2023.2.002","title":"Artificial intelligence for the management of water projects and the management of water resources: A bibliographical analysis","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Business, Innovation, and Economy","field":"Economics, Econometrics and Finance","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Water resources; Variety (cybernetics); Work (physics); Economic shortage; Scopus; Resource (disambiguation); Computer science; Project management; Engineering management; Data science; Engineering; Systems engineering; Artificial intelligence; Political science","score_opus":0.06899425998476569,"score_gpt":0.2650743722377456,"score_spread":0.19608011225297992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366808576","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022707465,0.97207737,0.0016452544,0.0016564426,0.00063287665,0.0000997421,0.0004007487,0.000047846836,0.021168916],"genre_scores_gemma":[0.012708762,0.9815875,0.002537296,0.00039869026,0.0003731946,0.00009580436,0.0003530351,0.000012628248,0.0019330371],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99766684,0.00061308884,0.000481023,0.00016531633,0.0009835664,0.00009017758],"domain_scores_gemma":[0.9953054,0.002793946,0.00063307607,0.00012490521,0.001063089,0.00007952477],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0016012333,0.000691246,0.0010080737,0.03422064,0.0009980015,0.004247492,0.0006139644,0.0008944716,0.0063944105],"category_scores_gemma":[0.00672391,0.00028475103,0.00096021476,0.0524971,0.00071304,0.0026679526,0.00084895355,0.0007421934,0.0010372966],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007730434,0.000108990105,0.0028914555,0.13712673,0.0005589189,0.00081856706,0.002279562,0.0019937681,0.00095073326,0.039788906,0.06306499,0.75034004],"study_design_scores_gemma":[0.000012376809,0.000092823146,0.011929635,0.13931504,0.0011006955,0.0007580547,0.0025802832,0.000913321,0.00050637807,0.008875016,0.8338496,0.00006674511],"about_ca_topic_score_codex":0.007757798,"about_ca_topic_score_gemma":0.009652117,"teacher_disagreement_score":0.96577936,"about_ca_system_score_codex":0.0035775192,"about_ca_system_score_gemma":0.007245275,"threshold_uncertainty_score":0.02595681},"labels":[],"label_agreement":null},{"id":"W4366808596","doi":"10.5267/j.jpm.2023.4.001","title":"The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Heuristics; Computer science; Probabilistic logic; Operations research; Variety (cybernetics); Range (aeronautics); Scheduling (production processes); Table (database); Mathematical optimization; Total cost; Industrial engineering; Management science; Data mining; Mathematics; Artificial intelligence; Engineering","score_opus":0.016106731645807417,"score_gpt":0.23659227085878468,"score_spread":0.22048553921297726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366808596","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041779913,0.9413634,0.037236094,0.0014720133,0.00046265268,0.000041103784,0.00011004087,0.00008015659,0.015056526],"genre_scores_gemma":[0.03556642,0.93182456,0.027429024,0.00040072433,0.0014942028,0.00007217569,0.0002868817,0.000052533225,0.0028735353],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.998654,0.0003122888,0.00013546518,0.00034174338,0.00043335443,0.00012306598],"domain_scores_gemma":[0.9947155,0.0040215347,0.00029361487,0.00015099102,0.000717052,0.00010126699],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025878795,0.0015024794,0.001575254,0.00354728,0.00072592654,0.0044734864,0.001653776,0.0019411212,0.004588568],"category_scores_gemma":[0.0045425612,0.0008786371,0.0016531235,0.008947696,0.0010541476,0.0055925553,0.0011835317,0.002094006,0.0014285853],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009777886,0.00025106958,0.0025894297,0.010953518,0.00013758765,0.00025876757,0.00031961375,0.024447154,0.0007989673,0.07796094,0.015643036,0.8665422],"study_design_scores_gemma":[0.000031873293,0.00060331554,0.008289401,0.0124218995,0.0005319399,0.0027547206,0.00279589,0.10659544,0.0024825172,0.18704253,0.6761066,0.000343847],"about_ca_topic_score_codex":0.003905439,"about_ca_topic_score_gemma":0.0026575893,"teacher_disagreement_score":0.004588568,"about_ca_system_score_codex":0.0014101557,"about_ca_system_score_gemma":0.0021482797,"threshold_uncertainty_score":0.015350282},"labels":[],"label_agreement":null},{"id":"W4366808616","doi":"10.5267/j.jpm.2023.3.002","title":"The attraction of public-private partnerships for road construction in India, as affected by both positive and negative factors","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Public–private partnership; Government (linguistics); Business; Private sector; General partnership; Finance; Investment (military); Descriptive statistics; Economic growth; Economics; Political science","score_opus":0.05598649176971299,"score_gpt":0.29686417883372623,"score_spread":0.24087768706401325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366808616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9633623,0.0012178897,0.0005879843,0.0034103768,0.000023379534,0.00004579172,0.000053833242,0.000014021133,0.031284366],"genre_scores_gemma":[0.99886924,0.0003743138,0.00012822969,0.000052333075,0.0000037181137,0.000008680604,0.0000071592217,0.0000010982415,0.00055529864],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.994894,0.0021942935,0.00020478165,0.00018619139,0.0014664012,0.0010543221],"domain_scores_gemma":[0.98842245,0.004273571,0.0032640495,0.0003038394,0.0014843914,0.0022515897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002999886,0.00013656764,0.000119702636,0.0012928956,0.0026857378,0.004902927,0.0005292711,0.00058091915,0.0030146958],"category_scores_gemma":[0.006973784,0.00019626423,0.00020430365,0.0024047603,0.0017506942,0.001850809,0.0035026746,0.00086626736,0.00025458712],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021507042,0.00043486708,0.69783086,0.0017406082,0.00009209055,0.0055730706,0.062105168,0.0011507291,0.0029629169,0.066469006,0.006444294,0.15498126],"study_design_scores_gemma":[0.000011232157,0.00028084288,0.6694462,0.00048827013,0.00007654834,0.0038775192,0.27347356,0.0009886645,0.0008309946,0.005436883,0.045024224,0.000065021275],"about_ca_topic_score_codex":0.0049842745,"about_ca_topic_score_gemma":0.014002666,"teacher_disagreement_score":0.0049842745,"about_ca_system_score_codex":0.0025334551,"about_ca_system_score_gemma":0.0060256002,"threshold_uncertainty_score":0.018381536},"labels":[],"label_agreement":null},{"id":"W4385777000","doi":"10.5267/j.jpm.2023.7.001","title":"MCDM approach to investigate the effectiveness of SCRUM events in minimizing risk factors in project management","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Software Engineering Techniques and Practices","field":"Computer Science","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scrum; Agile software development; Computer science; Project management; Process management; Scope (computer science); Systems engineering; Engineering; Software; Software development; Software engineering","score_opus":0.03841959546757676,"score_gpt":0.3012589585265162,"score_spread":0.2628393630589394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777000","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10920369,0.0014676453,0.8575319,0.0009101231,0.00018087673,0.0022742664,0.0013027075,0.00034030344,0.026788583],"genre_scores_gemma":[0.41270137,0.0007566766,0.58221555,0.00014501592,0.0000238359,0.0012289116,0.00050753384,0.000024051547,0.0023971666],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99645424,0.0020584182,0.00019224508,0.00021398663,0.00089427724,0.00018698556],"domain_scores_gemma":[0.9968221,0.0022258274,0.0001982005,0.0000939907,0.0005703171,0.00008957432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047159,0.0011354765,0.0015928017,0.006106249,0.0011277345,0.0016168107,0.0013979572,0.0012934074,0.0052480022],"category_scores_gemma":[0.006715724,0.00056023104,0.0017457703,0.0063832803,0.00047097966,0.00084687956,0.0012517793,0.0012349702,0.00031071596],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048220513,0.0012761047,0.014957642,0.0025694722,0.0011326085,0.000737241,0.0011952758,0.7040855,0.0042918776,0.06639705,0.0042678313,0.19860722],"study_design_scores_gemma":[0.00017471216,0.00058454165,0.003271092,0.00030859635,0.00022442514,0.00017753454,0.001170038,0.9656863,0.0017639833,0.017604472,0.008967192,0.00006718297],"about_ca_topic_score_codex":0.014340576,"about_ca_topic_score_gemma":0.022340545,"teacher_disagreement_score":0.014340576,"about_ca_system_score_codex":0.0027305642,"about_ca_system_score_gemma":0.003027131,"threshold_uncertainty_score":0.028514206},"labels":[],"label_agreement":null},{"id":"W4385777037","doi":"10.5267/j.jpm.2023.6.002","title":"Incentive mechanisms for managing local subcontractors in international construction projects","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China; National Science Foundation","keywords":"Incentive; Procurement; Business; Structural equation modeling; Finance; Industrial organization; Marketing; Economics; Microeconomics; Computer science","score_opus":0.08358511607495982,"score_gpt":0.3829345402635442,"score_spread":0.29934942418858435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777037","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91825867,0.0005874164,0.04028223,0.0015030712,0.000042270538,0.00070280913,0.000071211594,0.00008654586,0.038465764],"genre_scores_gemma":[0.9951546,0.00009970429,0.0037978012,0.000029351864,0.000008920697,0.000108140805,0.000009987363,0.000003709972,0.0007876675],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9910041,0.005989062,0.00042985077,0.00047822134,0.0010868101,0.0010119042],"domain_scores_gemma":[0.9757078,0.01175906,0.007885435,0.0010899291,0.0017117753,0.0018458898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013200405,0.0004481148,0.00032541258,0.0016164598,0.0017522108,0.0032949457,0.0010555178,0.0007485838,0.0042003947],"category_scores_gemma":[0.02462947,0.00031422218,0.00031696138,0.0012247815,0.0021328938,0.0024207032,0.0037439263,0.00082462165,0.00023961352],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00079689507,0.002395703,0.30441988,0.0010486513,0.0003560623,0.0012390175,0.014309688,0.06664727,0.010235007,0.25216192,0.003327494,0.3430623],"study_design_scores_gemma":[0.00037733506,0.0029977807,0.5792038,0.0013520209,0.00048643842,0.00077900954,0.04327054,0.12326566,0.009641567,0.16679087,0.071379885,0.0004551634],"about_ca_topic_score_codex":0.0020182224,"about_ca_topic_score_gemma":0.0055770134,"teacher_disagreement_score":0.013200405,"about_ca_system_score_codex":0.0033337495,"about_ca_system_score_gemma":0.0060215183,"threshold_uncertainty_score":0.069811225},"labels":[],"label_agreement":null},{"id":"W4385777078","doi":"10.5267/j.jpm.2023.8.001","title":"Moderation role of government acts, laws and policies between economic factors and risk management: A case study of Saudi Arabia contractors","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Risk management; Business; Workforce; Abandonment (legal); Risk analysis (engineering); Finance; Economics; Economic growth","score_opus":0.06072112255725954,"score_gpt":0.3459567501485912,"score_spread":0.28523562759133164,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.999308,0.000025091527,0.000095371164,0.000061824685,6.980625e-7,0.000010624067,0.00000688536,4.1410377e-7,0.0004911289],"genre_scores_gemma":[0.999453,0.000049459282,0.0001412106,0.000012928607,0.0000011606046,0.0000069903554,0.0000076115575,5.8563865e-7,0.00032708506],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9975834,0.0015814118,0.00009621674,0.00012461717,0.00021560767,0.00039880007],"domain_scores_gemma":[0.99007916,0.006892953,0.0012140671,0.00026925717,0.000808151,0.0007365126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003698238,0.00023937627,0.000261428,0.00077072345,0.0023093093,0.0019104513,0.0005527233,0.0007525807,0.0020203202],"category_scores_gemma":[0.006344123,0.0002176054,0.00029115734,0.0006674796,0.0012109055,0.0007740765,0.0010888968,0.0008576404,0.00015521086],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000558079,0.002393011,0.7730218,0.00016431912,0.00011415175,0.00940626,0.1735644,0.001895806,0.0016988032,0.0054234467,0.00078478287,0.03097513],"study_design_scores_gemma":[0.00006540666,0.0009245134,0.41246632,0.00020017225,0.0001231142,0.0016209214,0.5631959,0.011415145,0.0015934905,0.0010751409,0.007244896,0.000075105905],"about_ca_topic_score_codex":0.042694476,"about_ca_topic_score_gemma":0.049527537,"teacher_disagreement_score":0.042694476,"about_ca_system_score_codex":0.0021627396,"about_ca_system_score_gemma":0.0028355091,"threshold_uncertainty_score":0.084891915},"labels":[],"label_agreement":null},{"id":"W4385777161","doi":"10.5267/j.jpm.2023.5.001","title":"Assessment of the impact of disregarding influencing factors on artisans performance in building construction projects in Tanzania","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workmanship; Tanzania; Productivity; Construction industry; Process (computing); Quality (philosophy); Business; Building construction; Enforcement; Structural equation modeling; Engineering; Operations management; Computer science; Construction engineering; Mathematics; Economic growth; Economics; Environmental planning; Geography; Political science; Statistics","score_opus":0.07623431305462511,"score_gpt":0.402426235617294,"score_spread":0.32619192256266893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988366,0.00004710966,0.00015126518,0.00005207815,0.0000031384893,0.000010437267,0.000012264117,0.0000017265505,0.00088552106],"genre_scores_gemma":[0.99970657,0.00002681932,0.00011607032,0.0000053842155,0.0000016792764,0.0000050932367,0.000010639997,8.4460345e-7,0.00012691508],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9928422,0.0034563125,0.0004588478,0.00037258197,0.0017339722,0.0011361163],"domain_scores_gemma":[0.98123115,0.007245677,0.0065444196,0.0010283423,0.0023339756,0.0016164547],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065860427,0.00035302693,0.00032342447,0.0007724138,0.0015329958,0.0014196383,0.00048000886,0.00035086766,0.0015638996],"category_scores_gemma":[0.018479798,0.00020587408,0.00030979898,0.0007655596,0.0016743197,0.0004977989,0.0016619421,0.00060130615,0.00021597928],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002166607,0.00021539697,0.9563838,0.00013401601,0.00006710306,0.0005209201,0.010131747,0.0011172874,0.0018609802,0.0004431595,0.00029845533,0.028610488],"study_design_scores_gemma":[0.0000028004984,0.00028599933,0.98369414,0.00006199875,0.000031662355,0.00009813589,0.013624119,0.00088461733,0.00048808617,0.00011985302,0.0006948694,0.000013716935],"about_ca_topic_score_codex":0.011744817,"about_ca_topic_score_gemma":0.030781008,"teacher_disagreement_score":0.011744817,"about_ca_system_score_codex":0.0018156421,"about_ca_system_score_gemma":0.0027863334,"threshold_uncertainty_score":0.03483075},"labels":[],"label_agreement":null},{"id":"W4385777167","doi":"10.5267/j.jpm.2023.6.001","title":"An analysis of sustainable change management for quality 4.0: Evidence from hybrid project management adoption in the Malaysian FinTech context","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Technology Adoption and User Behaviour","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Theory of planned behavior; Structural equation modeling; Context (archaeology); Knowledge management; Sustainability; Quality (philosophy); Control (management); Business; Marketing; Affect (linguistics); Process management; Computer science; Psychology; Management; Economics","score_opus":0.28261866238918054,"score_gpt":0.4753761085656515,"score_spread":0.19275744617647095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385777167","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987286,0.00008609774,0.00013066072,0.000074091404,0.0000013786,0.000018196573,0.000009133866,0.0000011828698,0.000950699],"genre_scores_gemma":[0.9994648,0.000102605074,0.00022950437,0.000028960141,0.0000013965205,0.000016691933,0.000012419508,0.0000014307537,0.00014227655],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99407935,0.0030842486,0.0003633048,0.0004593565,0.0015139637,0.0004996969],"domain_scores_gemma":[0.96120083,0.020742455,0.01074302,0.001553391,0.0039973613,0.0017629383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009022484,0.00025735682,0.00028741034,0.0017232905,0.0014000422,0.0019479915,0.0006342742,0.00055769907,0.0017101527],"category_scores_gemma":[0.021117527,0.00032423364,0.00047749368,0.0020136589,0.001465461,0.0015239996,0.0020861628,0.00093688426,0.00014138143],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016237171,0.00062395795,0.91263235,0.00031564472,0.00009497306,0.00035430002,0.037982825,0.000223768,0.0006683977,0.001157518,0.00015416298,0.04562975],"study_design_scores_gemma":[0.0000143362,0.0006014041,0.95392615,0.0002339082,0.00004838837,0.00017501299,0.042058133,0.0006249139,0.0005103795,0.00027433073,0.001509051,0.00002400365],"about_ca_topic_score_codex":0.014948419,"about_ca_topic_score_gemma":0.02193505,"teacher_disagreement_score":0.014948419,"about_ca_system_score_codex":0.0025019418,"about_ca_system_score_gemma":0.0038591286,"threshold_uncertainty_score":0.04771608},"labels":[],"label_agreement":null},{"id":"W4389828922","doi":"10.5267/j.jpm.2023.8.002","title":"The impact of triple constraints on the project success, a moderating role of organizational support","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project management triangle; Pre-construction services; Project management; Project planning; Business; Process management; Quality (philosophy); Project manager; OPM3; Operations management; Engineering; Systems engineering","score_opus":0.0712926642456481,"score_gpt":0.38492103045456166,"score_spread":0.31362836620891354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389828922","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969938,0.0001705171,0.00038678973,0.00023854582,0.0000106932775,0.000028062208,0.00005096474,0.0000030891563,0.0021175942],"genre_scores_gemma":[0.9991566,0.00006609074,0.000266553,0.000024577133,0.000007732137,0.00005188194,0.000027319531,0.0000022844474,0.0003970477],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9923711,0.0044876947,0.00046388584,0.0005233179,0.0012015873,0.00095248385],"domain_scores_gemma":[0.9412916,0.036610242,0.010964208,0.0016927829,0.0021057604,0.007335456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037282365,0.00053582067,0.00041922147,0.00072152773,0.00095360575,0.001922533,0.00063895783,0.00075911876,0.0062582786],"category_scores_gemma":[0.025487386,0.0002304052,0.00040808824,0.00058259757,0.00075694587,0.0010152648,0.0029478832,0.0011242443,0.00029002948],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014959933,0.0020367717,0.92714226,0.0005063011,0.00055685424,0.00069560396,0.008971048,0.00080111873,0.0027681051,0.0023665198,0.00055564736,0.05210382],"study_design_scores_gemma":[0.00006391633,0.0014551794,0.9819709,0.00025024783,0.00029750643,0.00021206867,0.009725383,0.0010636571,0.0008473565,0.001081336,0.003000655,0.00003197394],"about_ca_topic_score_codex":0.0023170721,"about_ca_topic_score_gemma":0.0030517871,"teacher_disagreement_score":0.0062582786,"about_ca_system_score_codex":0.0007518284,"about_ca_system_score_gemma":0.0024493597,"threshold_uncertainty_score":0.020936012},"labels":[],"label_agreement":null},{"id":"W4389829004","doi":"10.5267/j.jpm.2023.8.003","title":"A constraint programming approach for multi-objective tourist trip design problem with mandatory visits: A case study for İzmir Turkey","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Orienteering; Operations research; Mathematical optimization; Profit (economics); Integer programming; Vehicle routing problem; Computer science; Interval (graph theory); Profit maximization; Constraint programming; Linear programming; Tourism; Programming paradigm; Routing (electronic design automation); Stochastic programming; Mathematics; Geography; Economics; Computer network","score_opus":0.0754302478022522,"score_gpt":0.33967537219242133,"score_spread":0.2642451243901691,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389829004","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6965844,0.0033268852,0.23756349,0.0015189335,0.00017027649,0.0008264045,0.001345683,0.00033125037,0.058332633],"genre_scores_gemma":[0.88982725,0.0010414682,0.102887966,0.00007865933,0.00002538572,0.00028155613,0.00042012698,0.00004747084,0.005390159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993673,0.00028749087,0.000028674456,0.00007961846,0.000100162746,0.00013667782],"domain_scores_gemma":[0.9992662,0.00042581078,0.000081691214,0.000033619657,0.00010418983,0.00008843623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008834802,0.0011188036,0.00078174815,0.000842436,0.0010612033,0.0014308644,0.001320476,0.0018943498,0.0032601198],"category_scores_gemma":[0.0009801736,0.00044252718,0.0013272334,0.002172696,0.0005511837,0.00078386854,0.0008398556,0.0012023207,0.00018449812],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015725684,0.00025252407,0.0020393147,0.00041964444,0.000073209725,0.0029622316,0.00016516974,0.95893794,0.0018633796,0.012027046,0.002406319,0.018695982],"study_design_scores_gemma":[0.000049581835,0.00020691357,0.0016351774,0.000043078962,0.00006029308,0.000462758,0.00048577396,0.98895335,0.0007904728,0.0023413321,0.0049376297,0.000033687316],"about_ca_topic_score_codex":0.030434256,"about_ca_topic_score_gemma":0.040107775,"teacher_disagreement_score":0.030434256,"about_ca_system_score_codex":0.0021336582,"about_ca_system_score_gemma":0.0024990435,"threshold_uncertainty_score":0.06051421},"labels":[],"label_agreement":null},{"id":"W4389830598","doi":"10.5267/j.jpm.2023.11.001","title":"Evaluating procedures in the NEH heuristic for the PFSP - SIST","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Heuristics; Benchmark (surveying); Heuristic; Sequence (biology); Computation; Constraint (computer-aided design); Mathematical optimization; Computer science; Mathematics; Algorithm","score_opus":0.06777915404398799,"score_gpt":0.35990432375219694,"score_spread":0.29212516970820895,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389830598","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6135565,0.0026068187,0.35614613,0.00025624956,0.00020682089,0.0014417552,0.0007470467,0.001982651,0.02305594],"genre_scores_gemma":[0.6117215,0.00059687684,0.38398778,0.000079431775,0.000028463832,0.0005322582,0.0009594509,0.00022119709,0.001873022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973558,0.0010703875,0.00013484302,0.00031045693,0.0008123239,0.00031627534],"domain_scores_gemma":[0.99126524,0.00621862,0.00049847073,0.0008001259,0.0010052347,0.00021228031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042244424,0.0010153261,0.0013278851,0.0017746862,0.00075610494,0.0009872486,0.0014570805,0.0010154655,0.0026481585],"category_scores_gemma":[0.010775262,0.0004981623,0.0010692629,0.001439446,0.00060455204,0.0011559167,0.0007344948,0.0011592722,0.00037122684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060887454,0.00092046766,0.003907755,0.0005734583,0.00016585347,0.00006598083,0.000097058815,0.7682688,0.0045819413,0.005771951,0.0012805876,0.21375725],"study_design_scores_gemma":[0.00016471725,0.0012375952,0.0029012782,0.000052519525,0.000082069506,0.00007508316,0.00011263989,0.97868764,0.010473947,0.003131071,0.00304505,0.000036308644],"about_ca_topic_score_codex":0.0049268566,"about_ca_topic_score_gemma":0.0051952526,"teacher_disagreement_score":0.0049268566,"about_ca_system_score_codex":0.002330631,"about_ca_system_score_gemma":0.0031423671,"threshold_uncertainty_score":0.022341311},"labels":[],"label_agreement":null},{"id":"W4389832522","doi":"10.5267/j.jpm.2023.9.001","title":"A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico","keywords":"Job shop scheduling; Mathematical optimization; Initialization; Computer science; Scheduling (production processes); Idle; Greedy algorithm; Flow shop scheduling; Constructive; Algorithm; Mathematics; Schedule; Process (computing)","score_opus":0.02007630204829185,"score_gpt":0.2706051062433185,"score_spread":0.25052880419502666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389832522","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008372772,0.00014603896,0.98948085,0.00005639735,0.00003409186,0.00013056312,0.000014711132,0.0001828559,0.001581669],"genre_scores_gemma":[0.20179822,0.00016364714,0.7954387,0.00009840864,0.000033090197,0.00060779334,0.00007844174,0.00008137064,0.0017003958],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992131,0.00032624058,0.00003658454,0.00010917035,0.00020648369,0.00010846085],"domain_scores_gemma":[0.99925166,0.0004469807,0.00008774706,0.000048934544,0.000115651506,0.000048957558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015972407,0.0013989167,0.0012365681,0.0012172584,0.000552026,0.000754401,0.0018339963,0.001620407,0.0020054413],"category_scores_gemma":[0.00206994,0.0006687861,0.0013623318,0.0008594008,0.00072793866,0.00085512217,0.0010512794,0.0010843973,0.00038720897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000113495975,0.00019094498,0.0004887124,0.00022280235,0.00009135178,0.00014091503,0.00011615267,0.882651,0.0061687664,0.010944002,0.0012312079,0.0976407],"study_design_scores_gemma":[0.00002964804,0.000089648674,0.000089166846,0.000012866005,0.00001895013,0.000040547722,0.000015228847,0.99661785,0.0011039355,0.0013353061,0.00063494634,0.000011988524],"about_ca_topic_score_codex":0.0030152004,"about_ca_topic_score_gemma":0.0037595101,"teacher_disagreement_score":0.0030152004,"about_ca_system_score_codex":0.0007782618,"about_ca_system_score_gemma":0.002676508,"threshold_uncertainty_score":0.008447111},"labels":[],"label_agreement":null},{"id":"W4389832523","doi":"10.5267/j.jpm.2023.11.002","title":"Scheduling parallel extrusion lines","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Université Laval; Transport Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Tabu search; Metaheuristic; Job shop scheduling; Computer science; Mathematical optimization; Simulated annealing; Nurse scheduling problem; Scheduling (production processes); Algorithm; Flow shop scheduling; Mathematics","score_opus":0.02529197579827337,"score_gpt":0.2720124708890158,"score_spread":0.24672049509074245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389832523","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27681348,0.00053102424,0.702689,0.0004375247,0.00015132695,0.00041952365,0.00047430076,0.0007663211,0.017717402],"genre_scores_gemma":[0.6910344,0.0005980742,0.28908196,0.00008752336,0.000068006,0.0003859845,0.0008231674,0.00024388317,0.017676964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991798,0.00025500808,0.000040475745,0.00019715782,0.00018605459,0.00014147755],"domain_scores_gemma":[0.9992587,0.0003696164,0.00014616895,0.00008276974,0.00009412597,0.000048592985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007557728,0.0007658172,0.0011358811,0.00050955755,0.0008095368,0.0009815025,0.0013887006,0.0012352654,0.009008353],"category_scores_gemma":[0.0014864072,0.0005725834,0.00085199455,0.0011823598,0.0004872095,0.0013292884,0.00088048045,0.0007980966,0.0009010955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004385963,0.00019787134,0.0012184184,0.00025019297,0.00004734622,0.0004216407,0.000119225166,0.9080681,0.01086472,0.008224222,0.0022341155,0.06791559],"study_design_scores_gemma":[0.00012615966,0.00038400665,0.0010182498,0.000022281314,0.0000226109,0.00020389812,0.00017364915,0.9647444,0.008717334,0.0111877555,0.013370938,0.000028805223],"about_ca_topic_score_codex":0.0023150404,"about_ca_topic_score_gemma":0.002501486,"teacher_disagreement_score":0.009008353,"about_ca_system_score_codex":0.00065050024,"about_ca_system_score_gemma":0.0009220998,"threshold_uncertainty_score":0.03013593},"labels":[],"label_agreement":null},{"id":"W4389832535","doi":"10.5267/j.jpm.2023.9.002","title":"Multi-mode multi-skill resource-constrained project scheduling problem with differentiated professional capabilities","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Science Foundation of Ministry of Education of China; Ministry of Education of the People's Republic of China","keywords":"Computer science; Scheduling (production processes); Integer programming; Schedule; Duration (music); Resource consumption; Distributed computing; Mathematical optimization; Algorithm; Operating system","score_opus":0.10238932933438215,"score_gpt":0.3957234782548167,"score_spread":0.2933341489204345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389832535","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30538365,0.0007664209,0.68416953,0.0008234494,0.00011997039,0.0003628743,0.00052085036,0.00021318937,0.0076400284],"genre_scores_gemma":[0.86131823,0.000390599,0.13224012,0.00012206009,0.00005459656,0.00054103567,0.0004508568,0.00005463917,0.004827865],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987955,0.00052660157,0.000051602496,0.00022217602,0.00012393112,0.00028022993],"domain_scores_gemma":[0.9984654,0.0008877929,0.00015556657,0.00005919887,0.00014316286,0.00028887473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017218523,0.00114315,0.0018295977,0.0007962055,0.00072090945,0.0011908092,0.0017993667,0.0014527943,0.0031886462],"category_scores_gemma":[0.0023000007,0.000660187,0.0011476163,0.0012316504,0.0005594533,0.0012993452,0.0009786171,0.0011711195,0.00021909627],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017289909,0.00012384253,0.0009752531,0.00013664913,0.00006321253,0.0002241532,0.000048952577,0.9773441,0.0011940862,0.0054839477,0.0008980616,0.013334887],"study_design_scores_gemma":[0.000033809876,0.00008303214,0.00026518916,0.000007784241,0.000015754511,0.00004031944,0.000039117233,0.99568284,0.00032268304,0.0031429555,0.00035849857,0.000007963209],"about_ca_topic_score_codex":0.0055118664,"about_ca_topic_score_gemma":0.0036204727,"teacher_disagreement_score":0.0055118664,"about_ca_system_score_codex":0.0010962813,"about_ca_system_score_gemma":0.0019505129,"threshold_uncertainty_score":0.010959566},"labels":[],"label_agreement":null},{"id":"W4391889802","doi":"10.5267/j.jpm.2024.2.002","title":"Solving blocking flowshop scheduling problem with makespan criterion using q-learning-based iterated greedy algorithms","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Job shop scheduling; Blocking (statistics); Greedy algorithm; Mathematical optimization; Computer science; Iterated function; Scheduling (production processes); Algorithm; Mathematics; Schedule","score_opus":0.017210502177712465,"score_gpt":0.2597019179466145,"score_spread":0.24249141576890204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391889802","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018793872,0.00025056052,0.9788654,0.00009363166,0.000026645681,0.00007510253,0.000013848905,0.00018821501,0.0016927999],"genre_scores_gemma":[0.6949265,0.00034543552,0.3023447,0.00019811417,0.000055517972,0.00029173488,0.00008750886,0.00008459636,0.0016659816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991709,0.00029662697,0.000039150367,0.000115703064,0.00021725878,0.00016031151],"domain_scores_gemma":[0.9985726,0.0008855285,0.00018136989,0.00005983369,0.00020942825,0.000091173904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021223389,0.001135774,0.0015630196,0.00067634415,0.00061333156,0.000759236,0.0017032227,0.00096984854,0.0012804948],"category_scores_gemma":[0.002957194,0.0004815999,0.0007773889,0.0007673286,0.00074820226,0.00080193876,0.0008133771,0.00090222183,0.00019189712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043616048,0.00006754735,0.0005167128,0.000062747415,0.00004112534,0.000033901837,0.000049383078,0.9592362,0.00070969056,0.0042933947,0.00053316663,0.03441251],"study_design_scores_gemma":[0.000009383146,0.000028421706,0.00005252338,0.0000036775702,0.0000051925895,0.000009066935,0.0000059147724,0.9980124,0.00012166855,0.0016258421,0.00012354471,0.0000022856864],"about_ca_topic_score_codex":0.006631463,"about_ca_topic_score_gemma":0.0040701474,"teacher_disagreement_score":0.006631463,"about_ca_system_score_codex":0.0009113212,"about_ca_system_score_gemma":0.0026576498,"threshold_uncertainty_score":0.0131857395},"labels":[],"label_agreement":null},{"id":"W4391909277","doi":"10.5267/j.jpm.2024.2.001","title":"No idle flow shop scheduling models with separated set-up times and concept of job weightage to optimize rental cost of machines","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Idle; Renting; Computer science; Flow shop scheduling; Set (abstract data type); Industrial engineering; Scheduling (production processes); Job shop; Operations research; Operations management; Mathematics; Engineering; Job shop scheduling; Schedule; Operating system; Civil engineering","score_opus":0.015715654331992405,"score_gpt":0.2629530622500021,"score_spread":0.2472374079180097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391909277","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07238199,0.00068752613,0.92014474,0.00027326785,0.00013915448,0.00013346426,0.00012539304,0.00012212041,0.005992445],"genre_scores_gemma":[0.86178416,0.000699048,0.12737177,0.000059638438,0.00007138208,0.00022836144,0.00012987519,0.00007635609,0.00957937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991742,0.0003934444,0.000024043744,0.00010293998,0.00016269671,0.00014263208],"domain_scores_gemma":[0.9993412,0.00033741255,0.000115934316,0.000056493416,0.00006902694,0.00008003691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017431381,0.0014153165,0.00117653,0.000726001,0.0005753825,0.0014734224,0.0016355516,0.0011902846,0.0024683457],"category_scores_gemma":[0.0020076986,0.00079591194,0.0014113756,0.00088508485,0.0009279502,0.001990491,0.00082591287,0.0015060209,0.0002930103],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000091612914,0.00009699525,0.00025940622,0.00007900615,0.000029758532,0.000058117035,0.000038285816,0.96646893,0.0017008407,0.024468066,0.0004085589,0.0063004917],"study_design_scores_gemma":[0.000007823444,0.00006125272,0.00010219536,0.000004815855,0.000008610879,0.000009959954,0.000008273194,0.9949641,0.00020242692,0.004319386,0.00030564007,0.0000055888445],"about_ca_topic_score_codex":0.0036042691,"about_ca_topic_score_gemma":0.0036069567,"teacher_disagreement_score":0.0036042691,"about_ca_system_score_codex":0.000977648,"about_ca_system_score_gemma":0.001639874,"threshold_uncertainty_score":0.009218693},"labels":[],"label_agreement":null},{"id":"W4391909296","doi":"10.5267/j.jpm.2023.12.001","title":"Operating room and surgical team members scheduling: A comprehensive review","year":2024,"lang":"en","type":"review","venue":"Journal of Project Management","topic":"Healthcare Operations and Scheduling Optimization","field":"Health Professions","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Operating room management; Surgical team; Operations management; Business; Operations research; Computer science; Medicine; Engineering; Surgery","score_opus":0.18530260652560104,"score_gpt":0.5227154089384485,"score_spread":0.33741280241284743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391909296","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000098769335,0.9988732,0.00012644193,0.00021324027,0.0001327288,0.000009367676,0.000020423573,0.000003933975,0.0005218355],"genre_scores_gemma":[0.0007839823,0.9985923,0.00024014314,0.00008137409,0.00012180567,0.000008917933,0.000032506843,0.000001702795,0.00013724554],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9991554,0.00017383615,0.00018497264,0.0001225639,0.0003046227,0.000058510766],"domain_scores_gemma":[0.9961468,0.0023945544,0.00045547693,0.000064187014,0.0008105272,0.00012841278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001950124,0.0009872942,0.0015370336,0.0037031956,0.00039833327,0.0012661784,0.001444086,0.0012407062,0.00524216],"category_scores_gemma":[0.0045203674,0.0005486157,0.001189097,0.0053861053,0.0004062395,0.0013704136,0.00064050255,0.0010426571,0.0012735662],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009183965,0.0001245199,0.00045231622,0.08218835,0.00028902388,0.00009029233,0.00009980981,0.0012110786,0.00035386393,0.0032336777,0.03305191,0.8788133],"study_design_scores_gemma":[0.000042794538,0.0002653012,0.0032659816,0.05410814,0.000988831,0.00071167486,0.00017290797,0.0005445465,0.0003234822,0.0017442463,0.93777966,0.000052299525],"about_ca_topic_score_codex":0.005107954,"about_ca_topic_score_gemma":0.0072469832,"teacher_disagreement_score":0.00524216,"about_ca_system_score_codex":0.0012054461,"about_ca_system_score_gemma":0.0051462958,"threshold_uncertainty_score":0.017536819},"labels":[],"label_agreement":null},{"id":"W4391909353","doi":"10.5267/j.jpm.2024.1.002","title":"Optimization of transport constraints and quality of service for joint resolution of uncertain scheduling and the job-shop problem with routing (JSSPR) as opposed to the job-shop problem with transport (JSSPT)","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Job shop; Job shop scheduling; Operations research; Computer science; Scheduling (production processes); Service quality; Routing (electronic design automation); Operations management; Business; Service (business); Flow shop scheduling; Engineering; Marketing; Computer network","score_opus":0.030116722702482113,"score_gpt":0.2687513315424775,"score_spread":0.23863460883999538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391909353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06164269,0.00079777,0.9277505,0.0005860007,0.000109670946,0.0001288834,0.0002434326,0.00020052578,0.008540535],"genre_scores_gemma":[0.8041831,0.0008766215,0.18720663,0.00018272833,0.00009718447,0.00020575503,0.00042851715,0.00019251318,0.0066268705],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988607,0.00047834232,0.000041119856,0.00017103007,0.00025359666,0.00019523567],"domain_scores_gemma":[0.9990206,0.00063617615,0.00012679897,0.000036754078,0.00009087825,0.00008875647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015953918,0.00094941974,0.00092090794,0.0006855289,0.000549487,0.0016041251,0.0010878837,0.0010787417,0.0034223981],"category_scores_gemma":[0.0026358387,0.0005040781,0.0010031521,0.0011135113,0.00092583155,0.0016248146,0.0010823668,0.001329881,0.0002477069],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007883301,0.000045887602,0.0002240026,0.00010407565,0.000032851895,0.00010521693,0.000042924,0.95505476,0.0021434042,0.027510228,0.00091244304,0.013745377],"study_design_scores_gemma":[0.00001370118,0.000050820832,0.00015670214,0.0000112875905,0.0000124623775,0.000031380743,0.00004171674,0.986568,0.000878584,0.010946346,0.001279898,0.000009062631],"about_ca_topic_score_codex":0.0053405045,"about_ca_topic_score_gemma":0.0037527867,"teacher_disagreement_score":0.0053405045,"about_ca_system_score_codex":0.0017181361,"about_ca_system_score_gemma":0.002051749,"threshold_uncertainty_score":0.012466013},"labels":[],"label_agreement":null},{"id":"W4391909581","doi":"10.5267/j.jpm.2024.1.001","title":"Project management approaches and their selection in the digital age: Overview, challenges and decision models","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Selection (genetic algorithm); Computer science; Data science; Management science; Engineering; Artificial intelligence","score_opus":0.06321626924180404,"score_gpt":0.2553401872433735,"score_spread":0.19212391800156944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391909581","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08319872,0.013775051,0.8521396,0.01045646,0.00016457104,0.0014973616,0.0005417274,0.0003082913,0.037918195],"genre_scores_gemma":[0.36849657,0.011763754,0.613491,0.00032885204,0.00010736851,0.0013098943,0.00067950395,0.00008274969,0.0037403333],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97569263,0.01329619,0.0023339991,0.0019023828,0.0059758117,0.0007989656],"domain_scores_gemma":[0.9645435,0.026590245,0.003015072,0.0013274392,0.0036915657,0.0008321983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021404965,0.0010219817,0.0011177453,0.00580688,0.0014980508,0.012501621,0.0028352072,0.0019051342,0.0026726553],"category_scores_gemma":[0.025694124,0.0009986721,0.0015087166,0.0077302917,0.0033521324,0.010654773,0.0042931437,0.002817054,0.000856185],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000177265,0.00056469167,0.0138177015,0.002236033,0.0001672001,0.00032864817,0.004052667,0.089686304,0.0010395932,0.44905016,0.004368652,0.43451113],"study_design_scores_gemma":[0.00007600145,0.00030918114,0.0059318836,0.0021836401,0.00009128179,0.00058252667,0.007379076,0.3630036,0.0020956697,0.5429177,0.075229324,0.0002000131],"about_ca_topic_score_codex":0.003561548,"about_ca_topic_score_gemma":0.0028986684,"teacher_disagreement_score":0.021404965,"about_ca_system_score_codex":0.0063195396,"about_ca_system_score_gemma":0.0055171014,"threshold_uncertainty_score":0.11320162},"labels":[],"label_agreement":null},{"id":"W4399685656","doi":"10.5267/j.jpm.2024.3.001","title":"Optimizing Modular Hub Location in Air and Road Transportation Systems","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Transport engineering; Computer science; Environmental science; Aeronautics; Engineering; Operating system","score_opus":0.009751662386205569,"score_gpt":0.2341576986375957,"score_spread":0.22440603625139013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399685656","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25120315,0.0008702291,0.7388252,0.0002374974,0.00007472504,0.00015401079,0.0012169015,0.00060310896,0.0068151997],"genre_scores_gemma":[0.86398506,0.00049242674,0.13145027,0.000039059716,0.000022037508,0.00015065822,0.0008531035,0.000085269196,0.0029222227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994199,0.00023889837,0.000018987215,0.00011894453,0.00008328259,0.00012006929],"domain_scores_gemma":[0.9994574,0.00028261362,0.00010309376,0.000047400816,0.00006212432,0.000047386664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011073754,0.0010501381,0.0009833603,0.00096486567,0.00031542967,0.0010906309,0.00094373344,0.0009267401,0.0031049438],"category_scores_gemma":[0.0018341219,0.0005063588,0.0010188464,0.0017264081,0.00044888025,0.001049775,0.00072905194,0.0007317851,0.00032269207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002781044,0.000020068126,0.00044147967,0.000043814845,0.000018964658,0.000029217337,0.00000728956,0.98848724,0.00045255307,0.0020692656,0.000359594,0.008042711],"study_design_scores_gemma":[0.0000057392563,0.000035791898,0.0003078003,0.0000051143074,0.000010480845,0.000012674568,0.000015646094,0.99702066,0.0003994726,0.0017340628,0.00044832774,0.000004133729],"about_ca_topic_score_codex":0.009363432,"about_ca_topic_score_gemma":0.010649908,"teacher_disagreement_score":0.009363432,"about_ca_system_score_codex":0.0013897258,"about_ca_system_score_gemma":0.001380488,"threshold_uncertainty_score":0.018617868},"labels":[],"label_agreement":null},{"id":"W4399685726","doi":"10.5267/j.jpm.2024.4.001","title":"Does risk management components influence on project success? Evidence from IT sector ,","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Risk management; Risk analysis (engineering); Process management; Knowledge management; Computer science; Finance","score_opus":0.10543946744118546,"score_gpt":0.39281216922399254,"score_spread":0.28737270178280705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399685726","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98500896,0.0036731348,0.0011352295,0.00096737617,0.000013669983,0.000060670154,0.00005905221,0.000009543513,0.009072375],"genre_scores_gemma":[0.9977702,0.0014233254,0.00039235796,0.000063322215,0.000008516179,0.00002473911,0.000025738052,0.000005957329,0.00028578806],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9817332,0.01105397,0.0012285804,0.0011142506,0.0041146614,0.0007552076],"domain_scores_gemma":[0.6636638,0.25849935,0.059044264,0.005219452,0.008045352,0.0055278228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013947359,0.00035923335,0.0004460674,0.002204731,0.00074116007,0.0029417817,0.0009176767,0.0009473748,0.0061169486],"category_scores_gemma":[0.11038808,0.00041568335,0.00085708604,0.0019387926,0.002012515,0.0025642079,0.0019132429,0.0012309989,0.00047744933],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007416976,0.0010121542,0.88472867,0.0013620612,0.00080587144,0.0003229974,0.013201879,0.00046396087,0.0003728688,0.0033195298,0.00050016557,0.093168214],"study_design_scores_gemma":[0.00003122269,0.0006908818,0.98235196,0.0012542215,0.00040293037,0.00027550053,0.009477641,0.0006302483,0.00035978798,0.0015292964,0.002964292,0.000031915566],"about_ca_topic_score_codex":0.0026977165,"about_ca_topic_score_gemma":0.0031654313,"teacher_disagreement_score":0.013947359,"about_ca_system_score_codex":0.0011017885,"about_ca_system_score_gemma":0.0027004005,"threshold_uncertainty_score":0.07376152},"labels":[],"label_agreement":null},{"id":"W4399685868","doi":"10.5267/j.jpm.2024.6.001","title":"The linkage between leadership style of project manager and project performance: Evidence from telecommunication industry","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Collaboration in agile enterprises","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Linkage (software); Business; Telecommunications; Management; Engineering; Economics","score_opus":0.09760589942710861,"score_gpt":0.3184215623248579,"score_spread":0.2208156628977493,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399685868","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.997417,0.00030502415,0.00020586855,0.00013882166,0.000004243853,0.0000050868516,0.000027304965,0.00000208518,0.0018945632],"genre_scores_gemma":[0.9994318,0.0002667167,0.000104637096,0.00002361187,0.0000055083083,0.0000057224765,0.000025795942,0.0000017133066,0.00013451235],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99587774,0.0021921052,0.0002550217,0.0003694448,0.0009896879,0.0003160591],"domain_scores_gemma":[0.95478994,0.026644757,0.012202064,0.0011067872,0.003141222,0.0021151958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003979606,0.00016320508,0.00018321366,0.0013446022,0.0005998445,0.0015799339,0.0003102592,0.00024602728,0.0023281444],"category_scores_gemma":[0.023654778,0.0001569677,0.00018466392,0.0015553626,0.0008085434,0.0006742776,0.0010391669,0.00054742995,0.00027593787],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007459424,0.00013913582,0.969143,0.0001236787,0.00006971206,0.00012341101,0.0046547255,0.00012697416,0.00021399539,0.00022491635,0.00021912403,0.024886709],"study_design_scores_gemma":[0.0000038095047,0.00011100637,0.9935453,0.000056522236,0.00001761707,0.00008247122,0.0053086216,0.00016171059,0.00008804681,0.000089564615,0.00052928436,0.000006153834],"about_ca_topic_score_codex":0.0022785836,"about_ca_topic_score_gemma":0.0038765303,"teacher_disagreement_score":0.003979606,"about_ca_system_score_codex":0.00043006116,"about_ca_system_score_gemma":0.0009214253,"threshold_uncertainty_score":0.02104646},"labels":[],"label_agreement":null},{"id":"W4399685960","doi":"10.5267/j.jpm.2024.5.001","title":"Development of a prototype system integration model for RFID technology with the internet of things and its implementation to improve precast concrete material management in Indonesia","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"RFID technology advancements","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Indonesia","keywords":"Precast concrete; Internet of Things; The Internet; Construction engineering; Computer science; Engineering; Systems engineering; Civil engineering; World Wide Web","score_opus":0.011117838349724378,"score_gpt":0.26821969119420874,"score_spread":0.2571018528444844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399685960","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24040206,0.00019877467,0.70997214,0.00067469757,0.00011839634,0.003225707,0.00039908194,0.0039655915,0.04104353],"genre_scores_gemma":[0.65192693,0.0003285018,0.33326527,0.00007052392,0.0000095511205,0.0028318518,0.0006085963,0.0001221808,0.010836555],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923015,0.0002582991,0.000076453034,0.00012339668,0.0002315502,0.00008014006],"domain_scores_gemma":[0.999199,0.00028934705,0.00007698783,0.00008110323,0.00031050993,0.00004305886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015451293,0.00060221006,0.00041370437,0.00058981904,0.000571013,0.0015866675,0.0017225804,0.0010814448,0.006029943],"category_scores_gemma":[0.002098726,0.00056534226,0.00092095387,0.0003426108,0.00044027183,0.0024917142,0.0010098274,0.00082919723,0.0009790601],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012657596,0.003036889,0.032328594,0.002245052,0.00024948982,0.002265465,0.007186405,0.39043438,0.07297886,0.09082097,0.0063982937,0.39078978],"study_design_scores_gemma":[0.00016677653,0.0010323399,0.00822955,0.00029690954,0.00018025275,0.00031556428,0.0013987612,0.93519455,0.0209992,0.0064245,0.02566744,0.00009416433],"about_ca_topic_score_codex":0.0067824367,"about_ca_topic_score_gemma":0.0043638567,"teacher_disagreement_score":0.0067824367,"about_ca_system_score_codex":0.0010941749,"about_ca_system_score_gemma":0.002310096,"threshold_uncertainty_score":0.02017212},"labels":[],"label_agreement":null},{"id":"W4399686210","doi":"10.5267/j.jpm.2024.5.002","title":"Project portfolio selection criteria in the oil &amp; gas industry and a decision support tool based on fuzzy Multimoora","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Portfolio; Selection (genetic algorithm); Fuzzy logic; Biochemical engineering; Computer science; Business; Engineering; Artificial intelligence","score_opus":0.1393539174347893,"score_gpt":0.4531186464391016,"score_spread":0.3137647290043123,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399686210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20971482,0.00043916158,0.7753258,0.0007805263,0.000052690997,0.0010928672,0.00044745763,0.00044660585,0.011700048],"genre_scores_gemma":[0.4457793,0.00012445633,0.55229545,0.000056446166,0.000015398182,0.0005014418,0.00023233438,0.00002422839,0.0009709669],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9868889,0.008115843,0.0012302321,0.00067451893,0.0026858784,0.0004046625],"domain_scores_gemma":[0.9797203,0.01485726,0.0016214226,0.0004906998,0.0025964112,0.0007139102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0146512035,0.00089205784,0.00091347063,0.0070680273,0.0015767058,0.003583708,0.0011430156,0.0009595708,0.002931209],"category_scores_gemma":[0.024315717,0.00047959838,0.00097457436,0.0039093513,0.0009232492,0.0024932756,0.0020727108,0.00093346636,0.00037307758],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012482773,0.00092647295,0.021154558,0.0015982017,0.00041689537,0.0009981039,0.0040729647,0.2231195,0.011718996,0.05388657,0.0043691862,0.6764903],"study_design_scores_gemma":[0.0001275992,0.0007743353,0.0083742235,0.0004707745,0.00015274668,0.0004711282,0.0031183136,0.9264185,0.008136163,0.0435728,0.008236832,0.00014655614],"about_ca_topic_score_codex":0.0025500816,"about_ca_topic_score_gemma":0.003620851,"teacher_disagreement_score":0.0146512035,"about_ca_system_score_codex":0.0020994083,"about_ca_system_score_gemma":0.002383637,"threshold_uncertainty_score":0.07748395},"labels":[],"label_agreement":null},{"id":"W4399686279","doi":"10.5267/j.jpm.2024.4.002","title":"Optimization model of staffing for aircraft ground handling in the case of personnel substitutability","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Transport and Logistics Innovations","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Staffing; Computer science; Business; Operations research; Economics; Engineering","score_opus":0.049614003995679695,"score_gpt":0.2875780794784623,"score_spread":0.23796407548278262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399686279","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06678826,0.0009233975,0.8970543,0.00094677944,0.0001338907,0.0001904808,0.00083312724,0.00017672258,0.032953072],"genre_scores_gemma":[0.8826323,0.0013375568,0.07758209,0.00016875695,0.00009874627,0.0008671695,0.0007393995,0.00014817735,0.03642587],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904245,0.00033871213,0.000030492787,0.0001791103,0.00017410469,0.00023504792],"domain_scores_gemma":[0.9993192,0.00036593122,0.000108408654,0.000025729822,0.00012048445,0.000060284092],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013959303,0.001426819,0.0012590494,0.00091939204,0.00055395643,0.0023890259,0.0017327443,0.001864114,0.0066838823],"category_scores_gemma":[0.0018939666,0.0008860645,0.0014947455,0.0011646998,0.0007631639,0.0010864752,0.0011109737,0.0016113619,0.0007302632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034565863,0.000021567135,0.0002866189,0.000052900272,0.0000200212,0.00007381128,0.00003392304,0.987241,0.00045272,0.00929569,0.00037787648,0.0021092515],"study_design_scores_gemma":[0.00000967405,0.000027991913,0.00024536488,0.0000106294465,0.000013380205,0.000015265456,0.000025406043,0.9955363,0.00013304922,0.0032840602,0.00069192436,0.000006926931],"about_ca_topic_score_codex":0.015593841,"about_ca_topic_score_gemma":0.00797686,"teacher_disagreement_score":0.015593841,"about_ca_system_score_codex":0.002200489,"about_ca_system_score_gemma":0.002441558,"threshold_uncertainty_score":0.031006098},"labels":[],"label_agreement":null},{"id":"W4399686298","doi":"10.5267/j.jpm.2024.4.004","title":"Investigating the impact of lean construction principles on contractors’ project performance in Ethiopia using PLS-SEM","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Engineering; Construction engineering; Process management; Operations management","score_opus":0.18625872961082338,"score_gpt":0.4258892228710137,"score_spread":0.23963049326019034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399686298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99635184,0.000022736494,0.0019828978,0.000040259394,0.0000017906932,0.000046995425,0.00009131961,0.0000047624662,0.0014574202],"genre_scores_gemma":[0.99578494,0.000051518786,0.0036154022,0.000012789219,0.0000010523481,0.00004771334,0.00006223278,0.0000030127617,0.00042130053],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9959915,0.0026544335,0.00021502891,0.0002587251,0.0005852901,0.00029493732],"domain_scores_gemma":[0.9926755,0.0046659727,0.0007996268,0.00028704514,0.0013776117,0.00019421482],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00852126,0.0004067522,0.00026663623,0.0011699621,0.00074895914,0.0016047957,0.00037114616,0.00022827607,0.0013857373],"category_scores_gemma":[0.007863549,0.000286109,0.0003454417,0.0018023365,0.0007197264,0.00070403423,0.00083468296,0.0004144425,0.00014197665],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071301043,0.0010365311,0.76546204,0.00054213183,0.00028159164,0.0005805663,0.03195328,0.03636733,0.006905029,0.005381795,0.0010392807,0.14973752],"study_design_scores_gemma":[0.00009135312,0.001670655,0.7456865,0.00042593793,0.00025304142,0.00025374416,0.13968004,0.08540832,0.014718401,0.0029581748,0.008700817,0.00015307481],"about_ca_topic_score_codex":0.006600112,"about_ca_topic_score_gemma":0.008426955,"teacher_disagreement_score":0.00852126,"about_ca_system_score_codex":0.0016811482,"about_ca_system_score_gemma":0.0028800743,"threshold_uncertainty_score":0.045065284},"labels":[],"label_agreement":null},{"id":"W4399686398","doi":"10.5267/j.jpm.2024.4.003","title":"Optimizing outpatient appointment scheduling: Innovative strategies for enhanced efficiency in psychiatric clinics","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Healthcare Operations and Scheduling Optimization","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Medicine; Psychiatry; Psychology; Operations management; Engineering","score_opus":0.08043495341157691,"score_gpt":0.460932361930093,"score_spread":0.3804974085185161,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399686398","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49497333,0.001071242,0.49008787,0.0019158475,0.00007789302,0.00045578156,0.0001715832,0.0006760158,0.0105703985],"genre_scores_gemma":[0.9038888,0.0003511418,0.094597556,0.00010208532,0.000036237787,0.00010076089,0.000065950415,0.000035851284,0.0008216374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943715,0.00026095117,0.000033019158,0.00006183497,0.000113568916,0.0000935445],"domain_scores_gemma":[0.9992673,0.0002765445,0.00021357111,0.000054818433,0.00009359837,0.00009417931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001177344,0.0004463707,0.0004932783,0.0005655047,0.000454607,0.0009783589,0.0006621167,0.00029219766,0.001448063],"category_scores_gemma":[0.0027642339,0.00021414548,0.00026018766,0.0005886149,0.00019460762,0.0006670674,0.0005779182,0.00035989392,0.00018187135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004292763,0.001006842,0.019927276,0.00034853318,0.000083606414,0.00013219683,0.00045914488,0.51617247,0.018522557,0.009887462,0.0037994885,0.42923114],"study_design_scores_gemma":[0.00008576091,0.0005226054,0.009703066,0.000046340403,0.000056254856,0.00007481356,0.0005578768,0.97409976,0.004080776,0.0066655423,0.0040781875,0.000029015904],"about_ca_topic_score_codex":0.004236312,"about_ca_topic_score_gemma":0.007332414,"teacher_disagreement_score":0.004236312,"about_ca_system_score_codex":0.0008665068,"about_ca_system_score_gemma":0.0024264029,"threshold_uncertainty_score":0.008423328},"labels":[],"label_agreement":null},{"id":"W4399686401","doi":"10.5267/j.jpm.2024.5.003","title":"Critical success factors affecting project success in construction projects: A contemporary Indian perspective","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Critical success factor; Construction engineering; Architectural engineering; Engineering; Process management; Business; Computer science; Artificial intelligence","score_opus":0.10769226548919722,"score_gpt":0.4236981949898596,"score_spread":0.3160059295006624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399686401","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96568465,0.0023392166,0.0031318164,0.0033791394,0.00003258857,0.00008309285,0.00008229068,0.000035616733,0.025231611],"genre_scores_gemma":[0.99793017,0.0010636392,0.0005579891,0.000044906334,0.000010306032,0.00001658,0.000015773712,0.0000070051046,0.0003535365],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99516726,0.0016380929,0.00027769542,0.00026859698,0.0015152094,0.0011331252],"domain_scores_gemma":[0.98374444,0.0074979165,0.0036620996,0.00033537025,0.0025785314,0.0021816257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004251174,0.0006218502,0.00036046375,0.00592532,0.0042689517,0.0076372465,0.0010285949,0.00080520456,0.002117353],"category_scores_gemma":[0.010859819,0.0005010267,0.00045446688,0.0063001565,0.0077436566,0.002374153,0.0037092487,0.0017332401,0.00026616073],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024023138,0.00047221905,0.50404733,0.0014825803,0.00014793877,0.004649146,0.23416568,0.0034203683,0.003053323,0.04268485,0.0051230085,0.20051332],"study_design_scores_gemma":[0.000008888931,0.00025282672,0.61113405,0.001037546,0.00012675724,0.0021475407,0.34133723,0.0023396313,0.0013443242,0.012630753,0.027468821,0.00017158303],"about_ca_topic_score_codex":0.02440695,"about_ca_topic_score_gemma":0.023378363,"teacher_disagreement_score":0.02440695,"about_ca_system_score_codex":0.0060869623,"about_ca_system_score_gemma":0.0092482045,"threshold_uncertainty_score":0.048529744},"labels":[],"label_agreement":null},{"id":"W4402869631","doi":"10.5267/j.jpm.2024.7.003","title":"Cash holding and corporate governance on company financial performance: Case study of construction infrastructure project supporting industries on the Indonesian stock exchange","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Financial Reporting and Valuation Research","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Stock exchange; Indonesian; Corporate governance; Finance; Cash; Accounting; Stock (firearms); Engineering","score_opus":0.09175013559009763,"score_gpt":0.3263867358712591,"score_spread":0.23463660028116146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402869631","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9993026,0.000045703255,0.00001828879,0.000058228674,7.1315714e-7,0.0000037400275,0.00003812544,6.6349287e-7,0.0005319252],"genre_scores_gemma":[0.99946827,0.00007252939,0.000040832034,0.000011129681,0.0000033609383,0.0000037006866,0.000079882826,5.256094e-7,0.00031974743],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99947983,0.00020412866,0.000032643024,0.000051771684,0.000080202524,0.0001514202],"domain_scores_gemma":[0.9972017,0.0012398042,0.0009154257,0.00006372711,0.00020219837,0.0003771918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009804126,0.0002572631,0.00021422614,0.0014597193,0.0010919631,0.0013911169,0.00045425876,0.00052321085,0.0019961616],"category_scores_gemma":[0.0016574921,0.00012072283,0.0002550857,0.0014087041,0.00061727833,0.00079828216,0.00074008835,0.0007280754,0.00020183035],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008661789,0.000742023,0.9819551,0.000025241017,0.000043948,0.0032005084,0.0033401195,0.0011365718,0.0002706867,0.00057857524,0.0006657207,0.007954787],"study_design_scores_gemma":[0.00001140513,0.00019983086,0.9793793,0.000036702626,0.000042042622,0.000367336,0.01384415,0.0047702934,0.00035487866,0.00013070316,0.00084674614,0.000016640499],"about_ca_topic_score_codex":0.02690101,"about_ca_topic_score_gemma":0.042139057,"teacher_disagreement_score":0.02690101,"about_ca_system_score_codex":0.0016519978,"about_ca_system_score_gemma":0.0006503242,"threshold_uncertainty_score":0.05348885},"labels":[],"label_agreement":null},{"id":"W4402869714","doi":"10.5267/j.jpm.2024.7.004","title":"The striking mechanisms of innovation theories to create collaborative competitive advantage opportunities in global digital marketing","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Entrepreneurship Studies and Influences","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Competitive advantage; Marketing; Digital marketing; Industrial organization","score_opus":0.020923322087598062,"score_gpt":0.28035748596674837,"score_spread":0.2594341638791503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402869714","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24714819,0.0045580384,0.25838745,0.014934496,0.0002595048,0.00035692836,0.000097194,0.0001736649,0.47408447],"genre_scores_gemma":[0.9762295,0.0014517925,0.01694891,0.0005699557,0.00009563782,0.0002260124,0.000026401727,0.000021457392,0.0044303127],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99732167,0.0011663556,0.00007857535,0.00044456084,0.0007111121,0.00027781184],"domain_scores_gemma":[0.992961,0.0050230334,0.0008052088,0.0005092482,0.00043146507,0.00027007697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003889844,0.0007602481,0.00043551056,0.0028629208,0.001579676,0.0042815655,0.0010311264,0.002021378,0.009380982],"category_scores_gemma":[0.0072263773,0.0003447771,0.0012448748,0.0018377353,0.009783341,0.0065130387,0.0040559922,0.0019580119,0.0009550092],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020698202,0.0000988997,0.0056208232,0.00018975952,0.000065895096,0.000114482034,0.0038978462,0.0019996567,0.00029180446,0.9512,0.00070762506,0.035792526],"study_design_scores_gemma":[0.00006942546,0.00019751424,0.012262072,0.0003367362,0.00009875829,0.00040044554,0.004128126,0.008741372,0.0010003203,0.9477625,0.024948867,0.000053849744],"about_ca_topic_score_codex":0.0009995345,"about_ca_topic_score_gemma":0.0013977461,"teacher_disagreement_score":0.009380982,"about_ca_system_score_codex":0.002108638,"about_ca_system_score_gemma":0.0023539886,"threshold_uncertainty_score":0.03138256},"labels":[],"label_agreement":null},{"id":"W4402869738","doi":"10.5267/j.jpm.2024.7.001","title":"The impact of leadership styles on project success: The mediating role of team collaboration","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"King Khalid University","keywords":"Leadership style; Psychology; Knowledge management; Management; Business; Social psychology; Computer science","score_opus":0.10025114265585525,"score_gpt":0.41817778456601845,"score_spread":0.3179266419101632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402869738","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905524,0.00016124961,0.0014851278,0.00020150417,0.000014856844,0.000029303996,0.000020451573,0.000010911968,0.007524105],"genre_scores_gemma":[0.9991881,0.00008536194,0.00043410072,0.000011422532,0.000007100526,0.0000131589195,0.000008630077,0.0000023629257,0.0002496309],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99392325,0.003988051,0.00026023865,0.00023155687,0.0009776695,0.00061936816],"domain_scores_gemma":[0.97262925,0.014872783,0.0046621435,0.001174124,0.0021679804,0.0044937837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047515566,0.00044284706,0.00028823796,0.00079075503,0.00083862286,0.001995264,0.00037325133,0.00023619254,0.0035558597],"category_scores_gemma":[0.018546894,0.0001518641,0.00038446355,0.0005617135,0.0007039091,0.0009360385,0.0025906,0.0006544502,0.0002681398],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001820566,0.0005604901,0.8705143,0.00016296911,0.00024135812,0.000579703,0.009951486,0.00062007917,0.0017377024,0.0019187455,0.0004103358,0.11312092],"study_design_scores_gemma":[0.000043864544,0.000922652,0.9721387,0.00023360369,0.00012219914,0.0004396795,0.017880173,0.0024336583,0.000931882,0.0022310622,0.0025955457,0.000027027667],"about_ca_topic_score_codex":0.0010507151,"about_ca_topic_score_gemma":0.0015358033,"teacher_disagreement_score":0.0047515566,"about_ca_system_score_codex":0.00038940317,"about_ca_system_score_gemma":0.0019186402,"threshold_uncertainty_score":0.02512896},"labels":[],"label_agreement":null},{"id":"W4402869792","doi":"10.5267/j.jpm.2024.7.002","title":"Risk management in Egyptian construction: Comparative analysis of general and banking sectors using advanced quantitative methods","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Risk management; Risk analysis (engineering); Computer science; Finance","score_opus":0.15118815817983536,"score_gpt":0.49468175216695776,"score_spread":0.3434935939871224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402869792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9950352,0.00040476053,0.0019151005,0.00007233774,0.000002416235,0.00004457245,0.00010108626,0.0000049205005,0.0024198222],"genre_scores_gemma":[0.99803895,0.00031309543,0.0010782673,0.000009499637,0.000001930655,0.00002312445,0.00008528833,0.0000015904125,0.000448354],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983222,0.00074628845,0.0001699922,0.00013600154,0.00040434932,0.00022113662],"domain_scores_gemma":[0.9956921,0.0018807772,0.0010209302,0.00016716863,0.0011008012,0.00013825236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029684375,0.00033325146,0.0003151925,0.005052056,0.00046516408,0.0014474769,0.00028272354,0.0003157444,0.0014581882],"category_scores_gemma":[0.004688544,0.00014354661,0.0004610487,0.0057396027,0.0008429078,0.0007750674,0.0010928451,0.00021390143,0.00012122694],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065671105,0.00039006612,0.77566564,0.0009916031,0.00034514698,0.000818744,0.030367564,0.009080634,0.0027860198,0.0071704225,0.0008375522,0.17088984],"study_design_scores_gemma":[0.0000145709355,0.00041437952,0.915541,0.00021748603,0.00012590764,0.00043069097,0.06567836,0.010569767,0.0012590667,0.0016672172,0.004039656,0.000042001106],"about_ca_topic_score_codex":0.01017056,"about_ca_topic_score_gemma":0.013856558,"teacher_disagreement_score":0.01017056,"about_ca_system_score_codex":0.002451291,"about_ca_system_score_gemma":0.0013710108,"threshold_uncertainty_score":0.020222723},"labels":[],"label_agreement":null},{"id":"W4402869929","doi":"10.5267/j.jpm.2024.6.002","title":"NSGA-II simheuristic to solve a multi-objective flexible flow shop problem under stochastic machine breakdowns","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mathematical optimization; Multi-objective optimization; Computer science; Flow (mathematics); Mathematics","score_opus":0.01748178421884069,"score_gpt":0.2734323859230365,"score_spread":0.2559506017041958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402869929","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.097443804,0.00047547187,0.89430857,0.00020521393,0.00009237868,0.00021456862,0.00017971257,0.0006517538,0.006428507],"genre_scores_gemma":[0.7478184,0.00028532828,0.2484599,0.00013580076,0.000026471793,0.0004342057,0.00034279353,0.00008764294,0.0024094835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959224,0.00018811364,0.000020595628,0.000040433413,0.00009025026,0.00006839893],"domain_scores_gemma":[0.99941707,0.00032694262,0.00009005467,0.000038445134,0.000082445324,0.000045060908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009456673,0.00089546543,0.00073152187,0.0007749951,0.00033229272,0.0005791277,0.0007939984,0.00071297336,0.0010638468],"category_scores_gemma":[0.0013775305,0.00041535377,0.0008417018,0.0006730401,0.0003980434,0.00037138158,0.0005781705,0.0006399333,0.0001508321],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017033315,0.000015182981,0.00019129104,0.000020180472,0.000021808517,0.000016546279,0.000007827875,0.9929958,0.0002908737,0.0013031879,0.0001885,0.0049317256],"study_design_scores_gemma":[0.0000075022012,0.000020538346,0.000050263774,0.0000036635824,0.000004194858,0.0000064971223,0.000004569292,0.9988085,0.00014101744,0.0006688112,0.0002828412,0.0000015944404],"about_ca_topic_score_codex":0.007162443,"about_ca_topic_score_gemma":0.005924076,"teacher_disagreement_score":0.007162443,"about_ca_system_score_codex":0.0008591224,"about_ca_system_score_gemma":0.0017888723,"threshold_uncertainty_score":0.014241517},"labels":[],"label_agreement":null},{"id":"W4402870024","doi":"10.5267/j.jpm.2024.7.007","title":"Multi-objective flexible job-shop scheduling in hospital using discrete particle swarm optimization algorithm with adaptive inertia weight (DPSO-AIW)","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Inertia; Swarm behaviour; Mathematical optimization; Computer science; Job shop scheduling; Algorithm; Mathematics; Physics","score_opus":0.016060291096858068,"score_gpt":0.2622613785271928,"score_spread":0.2462010874303347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05893541,0.0003629306,0.9370599,0.00016793596,0.000059065358,0.000111717745,0.000048842932,0.0001934504,0.0030608024],"genre_scores_gemma":[0.77963954,0.00039103386,0.21705686,0.000040571053,0.000030296178,0.00021989617,0.00011501903,0.000023687531,0.002483069],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997477,0.00006919107,0.000016153783,0.000039910974,0.000082290964,0.000044817814],"domain_scores_gemma":[0.99985623,0.000050609004,0.00003020941,0.000013353209,0.00002807027,0.000021471402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037224733,0.00050522055,0.00076114666,0.00032085238,0.00043633708,0.00060571247,0.0008170308,0.00057603605,0.0006438887],"category_scores_gemma":[0.0004476603,0.0002673069,0.0007361535,0.0006319456,0.00027110137,0.00050866173,0.0006096038,0.00048228394,0.00010729492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037984282,0.000047503592,0.0006644935,0.000104338156,0.000032829048,0.0001330326,0.0000444399,0.95659846,0.0046911286,0.0029107027,0.0004792708,0.034255773],"study_design_scores_gemma":[0.000014045359,0.000051995474,0.0001792285,0.000003237591,0.0000073055066,0.000026849266,0.000013290196,0.9981452,0.00058998377,0.00054518104,0.0004178623,0.000005780929],"about_ca_topic_score_codex":0.0063031907,"about_ca_topic_score_gemma":0.003993778,"teacher_disagreement_score":0.0063031907,"about_ca_system_score_codex":0.00043611962,"about_ca_system_score_gemma":0.0011714351,"threshold_uncertainty_score":0.012533009},"labels":[],"label_agreement":null},{"id":"W4402870041","doi":"10.5267/j.jpm.2024.7.006","title":"Performance measurement: Key performance indicators as drivers in assessing risk and improving value in the services sector","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Outsourcing and Supply Chain Management","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Key (lock); Performance indicator; Value (mathematics); Business; Risk analysis (engineering); Performance measurement; Process management; Computer science; Statistics; Computer security; Mathematics; Marketing","score_opus":0.012358414676514773,"score_gpt":0.22107827712715059,"score_spread":0.2087198624506358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9555494,0.0012688661,0.017575772,0.004156593,0.000050486233,0.00030453454,0.0002745592,0.000064222935,0.020755637],"genre_scores_gemma":[0.9963037,0.0002702032,0.0029615103,0.00005393745,0.000010721859,0.000050311395,0.000047688598,0.0000041305434,0.00029775404],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9901721,0.005057472,0.0007510135,0.00040182623,0.0028810946,0.00073657854],"domain_scores_gemma":[0.9692654,0.013470147,0.010510359,0.0010099647,0.004007188,0.0017368774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010456048,0.00056862144,0.0003043178,0.0035463737,0.0009047415,0.003961083,0.00047154503,0.00068423914,0.0016332865],"category_scores_gemma":[0.03484389,0.00020897134,0.00046997063,0.0057996474,0.001490187,0.0051407595,0.0026458031,0.0014574343,0.00026115146],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017342999,0.00059698545,0.7549981,0.00080309616,0.000135966,0.00014631872,0.01081348,0.0033855673,0.0014990233,0.022374924,0.0014016669,0.20367143],"study_design_scores_gemma":[0.000014416732,0.000938684,0.9255595,0.0009776535,0.000104179606,0.00020900652,0.026859129,0.011694929,0.0033898815,0.022092506,0.008040463,0.00011964932],"about_ca_topic_score_codex":0.0025835729,"about_ca_topic_score_gemma":0.002666914,"teacher_disagreement_score":0.010456048,"about_ca_system_score_codex":0.0028382891,"about_ca_system_score_gemma":0.005021562,"threshold_uncertainty_score":0.055297494},"labels":[],"label_agreement":null},{"id":"W4402870234","doi":"10.5267/j.jpm.2024.7.005","title":"Talent management model: How to boost the central bank’s performance in the disruptive era","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Human Resource and Talent Management","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Central bank; Business; Financial system; Computer science; Economics; Keynesian economics; Monetary policy","score_opus":0.020874898271386666,"score_gpt":0.2487655095689966,"score_spread":0.22789061129760993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870234","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41465765,0.0039119213,0.05945194,0.11669243,0.0009524367,0.00091701007,0.00053203624,0.0009108176,0.40197375],"genre_scores_gemma":[0.97058827,0.0014432545,0.012044505,0.0011827848,0.00010017675,0.00025159778,0.00010253897,0.000026050628,0.014260716],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993087,0.00033470104,0.000019113178,0.00008176351,0.00011997834,0.00013580281],"domain_scores_gemma":[0.99917656,0.0001765774,0.000103543585,0.000026537773,0.0001491669,0.00036761884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013595277,0.000695038,0.00034147094,0.00095967005,0.0015264163,0.0040753735,0.0013647616,0.0013100648,0.00964963],"category_scores_gemma":[0.00189905,0.00015697996,0.00038021913,0.001014873,0.0012092585,0.0026038561,0.0014131584,0.0013946693,0.0015480217],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039359523,0.002803505,0.06377658,0.0010863668,0.0002230225,0.0012508127,0.010507253,0.050795257,0.002909615,0.40196294,0.08188133,0.38240966],"study_design_scores_gemma":[0.00058750156,0.0025446133,0.091667674,0.0025769237,0.0004986423,0.0007781699,0.03216179,0.28985432,0.0036180925,0.40551457,0.16982463,0.00037315037],"about_ca_topic_score_codex":0.007937686,"about_ca_topic_score_gemma":0.008552377,"teacher_disagreement_score":0.00964963,"about_ca_system_score_codex":0.003463124,"about_ca_system_score_gemma":0.006754392,"threshold_uncertainty_score":0.03228122},"labels":[],"label_agreement":null},{"id":"W4402870248","doi":"10.5267/j.jpm.2024.8.002","title":"The impact of IT tools on project management efficiency in the public sector: The mediating role of team communication","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Information Technology Governance and Strategy","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Public sector; Business; Knowledge management; Project management; Process management; Engineering; Political science; Computer science; Systems engineering","score_opus":0.02728321025257802,"score_gpt":0.2923014566067884,"score_spread":0.2650182463542104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870248","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9874802,0.00020563822,0.0031583407,0.00041540456,0.000009005279,0.0000392982,0.000015090212,0.00002102715,0.008656108],"genre_scores_gemma":[0.99893564,0.00008844686,0.00073426944,0.00001815183,0.0000050576605,0.000014062462,0.0000071579157,0.0000056514205,0.00019157083],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9733927,0.019664979,0.0010997216,0.0007659995,0.003291436,0.0017851795],"domain_scores_gemma":[0.8630956,0.10192239,0.01944241,0.004023455,0.007064266,0.004451881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012113903,0.00052517845,0.00039394834,0.0028972258,0.0015534983,0.005643661,0.0006300861,0.0005695177,0.0028585817],"category_scores_gemma":[0.060110696,0.00028829154,0.00047642255,0.001780426,0.0019228524,0.0033860996,0.004310378,0.00095266313,0.00025702285],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067424093,0.0021673916,0.5931774,0.00070424186,0.0006348348,0.0011535931,0.041433923,0.006087615,0.00447606,0.011601245,0.0010445756,0.336845],"study_design_scores_gemma":[0.00011721645,0.0018928153,0.8679965,0.0009324909,0.00041504085,0.00062446704,0.091543734,0.013957145,0.003836526,0.009127978,0.009439181,0.00011705257],"about_ca_topic_score_codex":0.0019086592,"about_ca_topic_score_gemma":0.0016258756,"teacher_disagreement_score":0.012113903,"about_ca_system_score_codex":0.0018925626,"about_ca_system_score_gemma":0.0042535104,"threshold_uncertainty_score":0.06406516},"labels":[],"label_agreement":null},{"id":"W4402870292","doi":"10.5267/j.jpm.2024.8.001","title":"Barriers to Internationalization: Evidence from Jordanian SMEs","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"International Business and FDI","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Internationalization; Business; Industrial organization; International trade","score_opus":0.026942467299565988,"score_gpt":0.28807931904368034,"score_spread":0.26113685174411433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.996487,0.00075995,0.00004351502,0.0003206845,0.000003627073,0.0000061589717,0.000059853475,9.322382e-7,0.0023182207],"genre_scores_gemma":[0.99866056,0.00090674084,0.000045510533,0.000120289464,0.0000059140543,0.00001082855,0.00007983547,0.0000016499941,0.00016862016],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986999,0.00043749393,0.00016647622,0.00013843889,0.00034613852,0.00021158245],"domain_scores_gemma":[0.9860698,0.0045684082,0.005598478,0.00051723095,0.0020751583,0.0011708544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025279964,0.00023453038,0.00035100197,0.0013978014,0.00087248854,0.001797609,0.00044169926,0.00049440196,0.0024930467],"category_scores_gemma":[0.012858553,0.00018779314,0.00019961678,0.002540474,0.0010573671,0.0016702183,0.0016377955,0.00055209803,0.00029248194],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013749817,0.00020637199,0.94143474,0.0005109045,0.000054164422,0.00052753947,0.03523668,0.00010898857,0.00033524583,0.0009839487,0.0005359901,0.019927846],"study_design_scores_gemma":[0.000010534623,0.00013597932,0.9247199,0.00043641694,0.000040508,0.0003112532,0.06945346,0.00014531618,0.00031934533,0.00026666708,0.0041447296,0.00001580522],"about_ca_topic_score_codex":0.0070691253,"about_ca_topic_score_gemma":0.009817542,"teacher_disagreement_score":0.0070691253,"about_ca_system_score_codex":0.00047784863,"about_ca_system_score_gemma":0.0016659691,"threshold_uncertainty_score":0.014055908},"labels":[],"label_agreement":null},{"id":"W4402870300","doi":"10.5267/j.jpm.2024.7.008","title":"Exploring the relationship between supply chain collaboration, risk management strategies, and supplier development on supply chain resilience: The mediating role of trust","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Supply Chain Resilience and Risk Management","field":"Business, Management and Accounting","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Supply chain; Supply chain risk management; Business; Supply chain management; Resilience (materials science); Risk management; Process management; Supplier relationship management; Service management; Knowledge management; Marketing; Computer science; Finance","score_opus":0.0374616302173305,"score_gpt":0.2702591919579287,"score_spread":0.23279756174059818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870300","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99063545,0.00034016848,0.0021197447,0.00068513403,0.000006703999,0.000030248477,0.000033797878,0.000006015189,0.0061426703],"genre_scores_gemma":[0.99911827,0.00017891596,0.00039921392,0.000018454475,0.0000030510503,0.000010576018,0.000011845368,8.167841e-7,0.00025883928],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99695754,0.0017472126,0.0001942225,0.00021821618,0.00045519727,0.00042772517],"domain_scores_gemma":[0.97598106,0.012947791,0.0058724224,0.0007221832,0.0028508934,0.0016255965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034922129,0.00037953793,0.0003143732,0.0015575946,0.0013034609,0.0026134988,0.00045059877,0.0004926388,0.0045428565],"category_scores_gemma":[0.015189911,0.00021430787,0.0005087109,0.0013941043,0.0012081417,0.0029311338,0.00416427,0.000866177,0.00020160552],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018546348,0.00042808056,0.87584877,0.0003607085,0.000311959,0.00109898,0.034024842,0.0030736092,0.0009206408,0.014911793,0.00050284027,0.06833236],"study_design_scores_gemma":[0.00003644058,0.00085851166,0.7919106,0.0013038896,0.0005586367,0.00075894385,0.1538436,0.020547237,0.0021083895,0.018717052,0.00925503,0.00010173782],"about_ca_topic_score_codex":0.007166272,"about_ca_topic_score_gemma":0.009080788,"teacher_disagreement_score":0.007166272,"about_ca_system_score_codex":0.0017838702,"about_ca_system_score_gemma":0.005626652,"threshold_uncertainty_score":0.018468797},"labels":[],"label_agreement":null},{"id":"W4402870553","doi":"10.5267/j.jpm.2024.8.003","title":"Assessing the effect of IT infrastructure on project success in the financial sector: The role of project flexibility","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Big Data and Business Intelligence","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Business; Finance; Project finance; Financial sector; Process management; Engineering management; Engineering; Economics; Management","score_opus":0.04613601271209535,"score_gpt":0.35396981552029466,"score_spread":0.30783380280819933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870553","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9973463,0.00002903381,0.0005890791,0.00006298358,0.0000013363884,0.000016690692,0.0000185105,0.0000049078776,0.0019312047],"genre_scores_gemma":[0.99968016,0.000017332548,0.00021735272,0.0000043213545,0.0000012938781,0.000013423247,0.000014239943,0.0000011407964,0.000050779967],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.988643,0.005985912,0.000800198,0.00053943816,0.0024849726,0.001546434],"domain_scores_gemma":[0.87875116,0.06553784,0.034812205,0.004078269,0.0060783247,0.01074218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009933712,0.00050630426,0.00034344516,0.002870913,0.00096970017,0.0026408639,0.00061629806,0.0005264565,0.0025972717],"category_scores_gemma":[0.059111863,0.00028300076,0.00054345466,0.0022907548,0.0024419785,0.002677273,0.0046719247,0.0011323991,0.00028389608],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022268329,0.0003302534,0.9626637,0.000086992964,0.00014934574,0.000208094,0.0030551967,0.0034336399,0.0008883976,0.0017549288,0.00016952227,0.027037345],"study_design_scores_gemma":[0.00001588885,0.00093976775,0.9830034,0.000112769274,0.000057316418,0.0001408428,0.008188136,0.004581386,0.0006056673,0.0015474387,0.00076810096,0.000039242],"about_ca_topic_score_codex":0.0024289316,"about_ca_topic_score_gemma":0.003626929,"teacher_disagreement_score":0.009933712,"about_ca_system_score_codex":0.0015605764,"about_ca_system_score_gemma":0.0028347676,"threshold_uncertainty_score":0.052535117},"labels":[],"label_agreement":null},{"id":"W4402870764","doi":"10.5267/j.jpm.2024.9.003","title":"Evaluating the impact of scope, time, cost, and quality management on project performance and business overall performance in Jordanian financial sector ,","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Applied Science Private University","keywords":"Scope (computer science); Business; Quality (philosophy); Finance; Quality costs; Computer science; Cost control","score_opus":0.16236003379900568,"score_gpt":0.4488349781110999,"score_spread":0.2864749443120942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870764","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981907,0.000093667106,0.0001962786,0.00006310681,0.0000018111871,0.0000220387,0.000015848738,0.0000018637006,0.0014147217],"genre_scores_gemma":[0.9989236,0.000109449116,0.0005447618,0.000015524354,0.0000034999807,0.000026309104,0.000031255287,0.0000016269375,0.0003440526],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9940096,0.0028784445,0.00045245522,0.00027518024,0.0017399376,0.00064441765],"domain_scores_gemma":[0.97724324,0.009322859,0.006701541,0.0004892767,0.004406965,0.0018361398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008224099,0.00035817994,0.00028477926,0.0014263157,0.0009427677,0.0021448846,0.00045020462,0.00035067872,0.001414754],"category_scores_gemma":[0.017628089,0.00020761251,0.00035926915,0.0013796063,0.0008766856,0.0011344602,0.0013207807,0.00052307843,0.00018760432],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003535938,0.0010239155,0.8608037,0.00028823534,0.00012906846,0.000387042,0.011840391,0.0023504642,0.0020615435,0.0013412251,0.0005972239,0.11882351],"study_design_scores_gemma":[0.000009934289,0.001100866,0.9748925,0.00008881525,0.000045909455,0.00010185924,0.018302536,0.002365944,0.0011060017,0.00036734762,0.0015945877,0.000023661523],"about_ca_topic_score_codex":0.003570928,"about_ca_topic_score_gemma":0.00808019,"teacher_disagreement_score":0.008224099,"about_ca_system_score_codex":0.0018499347,"about_ca_system_score_gemma":0.003873889,"threshold_uncertainty_score":0.043493688},"labels":[],"label_agreement":null},{"id":"W4402870891","doi":"10.5267/j.jpm.2024.9.001","title":"Neuromarketing: Understanding the effect of emotion and memory on consumer behavior by mediating the role of artificial intelligence and customers' digital experience","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Organizational Leadership and Management Strategies","field":"Business, Management and Accounting","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Neuromarketing; Psychology; Cognitive psychology; Neuroscience","score_opus":0.027875846024989045,"score_gpt":0.26005558963076014,"score_spread":0.2321797436057711,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870891","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97875893,0.0010521153,0.0062218197,0.00074445055,0.000019456655,0.000057523117,0.000099801924,0.000021812,0.013024101],"genre_scores_gemma":[0.99553657,0.00058259355,0.0025719027,0.00013823209,0.00001611459,0.00004238901,0.000039476476,0.0000031157497,0.0010695789],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99979967,0.000086735934,0.000010371131,0.0000405007,0.000033280707,0.000029464803],"domain_scores_gemma":[0.9988789,0.00066797837,0.00024220182,0.000059963906,0.000081563274,0.00006934779],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060904864,0.0003681405,0.00020317537,0.0006165319,0.00025946234,0.0016492882,0.00033411832,0.000508454,0.0040252646],"category_scores_gemma":[0.0021759558,0.0001396442,0.0003796722,0.00041258373,0.0005093868,0.0018811398,0.00076755823,0.0005810678,0.00020230316],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013466829,0.0022435437,0.5582778,0.0015000419,0.00039296207,0.0015113088,0.026887104,0.0020860776,0.028272387,0.025965383,0.001499768,0.350017],"study_design_scores_gemma":[0.000053012765,0.0010354319,0.94002306,0.0003317307,0.00032881316,0.0007267505,0.01624774,0.009356757,0.0049783317,0.02072563,0.006124709,0.000068080386],"about_ca_topic_score_codex":0.001898871,"about_ca_topic_score_gemma":0.0017639592,"teacher_disagreement_score":0.0040252646,"about_ca_system_score_codex":0.00043687358,"about_ca_system_score_gemma":0.00034985293,"threshold_uncertainty_score":0.013465822},"labels":[],"label_agreement":null},{"id":"W4402870928","doi":"10.5267/j.jpm.2024.9.002","title":"Factors affecting Jordanian Islamic banks towards competitive advantage","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Islamic Finance and Banking Studies","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Islam; Business; Competitive advantage; Geography; Marketing; Archaeology","score_opus":0.02102549581617423,"score_gpt":0.2702630769298076,"score_spread":0.24923758111363337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402870928","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9865578,0.00021097866,0.00009590675,0.0009924219,0.000011279242,0.000020072534,0.000037495924,0.000004663998,0.012069379],"genre_scores_gemma":[0.9988165,0.0001719947,0.000108098975,0.000121690304,0.000009979845,0.000006315489,0.00002550349,0.0000012979339,0.00073875586],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986292,0.00030252856,0.00009448358,0.0000754406,0.00054352666,0.00035480963],"domain_scores_gemma":[0.9955449,0.00075991754,0.0016195271,0.000075728094,0.0010143246,0.0009856204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012687426,0.00020506809,0.00013807043,0.0012731337,0.0014456697,0.003294141,0.000237195,0.00057678873,0.005717883],"category_scores_gemma":[0.0045021377,0.000101881626,0.00016022725,0.0012067248,0.0009318379,0.00073537766,0.0008188534,0.000567647,0.0006955061],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009421425,0.00028976917,0.9398947,0.00008663802,0.000046289508,0.00081514375,0.009811543,0.00027462072,0.00090900005,0.003167433,0.00421346,0.040397175],"study_design_scores_gemma":[0.000009268,0.00008623166,0.96701616,0.00006730019,0.000015285654,0.0003484569,0.023563007,0.00028662288,0.00023645563,0.0005815979,0.0077697323,0.00001997256],"about_ca_topic_score_codex":0.0055238004,"about_ca_topic_score_gemma":0.008639607,"teacher_disagreement_score":0.005717883,"about_ca_system_score_codex":0.00091403344,"about_ca_system_score_gemma":0.0019446792,"threshold_uncertainty_score":0.019128203},"labels":[],"label_agreement":null},{"id":"W4405397690","doi":"10.5267/j.jpm.2024.11.004","title":"The association between CEO characteristics and financial performance: The role of governance quality","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Impact of AI and Big Data on Business and Society","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Corporate governance; Business; Quality (philosophy); Association (psychology); Accounting; Finance; Psychology","score_opus":0.05875981364792634,"score_gpt":0.36567540657643455,"score_spread":0.30691559292850823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397690","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9974132,0.00030078134,0.00018180262,0.0002818463,0.000006738444,0.0000065014256,0.0000952668,0.0000024068056,0.001711454],"genre_scores_gemma":[0.99942744,0.00007448179,0.00006647901,0.000024772688,0.000010561004,0.0000020035138,0.00008667463,7.487599e-7,0.00030688674],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990858,0.00027547622,0.00012076284,0.000096636904,0.00022877564,0.00019256574],"domain_scores_gemma":[0.9847505,0.0033141891,0.008583945,0.00045384347,0.0013472944,0.0015502635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021289983,0.00012642043,0.00017602934,0.0009016066,0.00029027238,0.0013021996,0.00018740568,0.00024260404,0.0017621473],"category_scores_gemma":[0.006980378,0.00006386476,0.00014937278,0.0012181068,0.00034146052,0.0006895938,0.0005697273,0.00036057786,0.00019821349],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001644302,0.000027672559,0.9962081,0.000007993414,0.000022659986,0.000030485804,0.00009398558,0.000114361086,0.000075572854,0.00013439273,0.00010650012,0.0031618082],"study_design_scores_gemma":[0.0000018891701,0.000035179903,0.9985857,0.000009340506,0.000010598138,0.000022462957,0.0004086048,0.00027428317,0.000088455934,0.00010856168,0.00045275336,0.0000023111327],"about_ca_topic_score_codex":0.0030911874,"about_ca_topic_score_gemma":0.0071446053,"teacher_disagreement_score":0.0030911874,"about_ca_system_score_codex":0.0005820506,"about_ca_system_score_gemma":0.000670935,"threshold_uncertainty_score":0.011259377},"labels":[],"label_agreement":null},{"id":"W4405397698","doi":"10.5267/j.jpm.2024.11.003","title":"Impacts of marketing strategies on casual restaurant sales","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Consumer Retail Behavior Studies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Casual; Business; Marketing; Advertising; Political science","score_opus":0.03532190299859383,"score_gpt":0.30854893346028367,"score_spread":0.27322703046168983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397698","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9936566,0.00022294332,0.00009558998,0.00004753047,0.000005163393,0.000024881454,0.00005652237,0.000007647261,0.0058831135],"genre_scores_gemma":[0.9984629,0.00025187293,0.00026267735,0.000015834265,0.0000051442476,0.000012672003,0.000074498945,0.000003124366,0.000911322],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994443,0.00019856577,0.000039230945,0.00006123945,0.00016953272,0.000087139146],"domain_scores_gemma":[0.99608314,0.0019111336,0.000957215,0.000099348916,0.0003980171,0.00055119046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006625866,0.0004384249,0.00020340137,0.0008291692,0.0003002417,0.0017937585,0.00022622202,0.00021631521,0.0056368015],"category_scores_gemma":[0.0034486332,0.000106144274,0.00036372233,0.00060473906,0.00024306387,0.00051712553,0.00054102344,0.00035118408,0.00037166436],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00087958394,0.0020854697,0.84912926,0.00047627033,0.00041471646,0.0008793688,0.0024288038,0.00081878493,0.00770545,0.0009135656,0.0005373403,0.13373153],"study_design_scores_gemma":[0.000015044973,0.0008335223,0.99043953,0.000056702618,0.000110613786,0.00013337607,0.0041978597,0.0008984338,0.0012187684,0.00018967214,0.0018897026,0.000016724793],"about_ca_topic_score_codex":0.0022444928,"about_ca_topic_score_gemma":0.0049948823,"teacher_disagreement_score":0.0056368015,"about_ca_system_score_codex":0.0005195049,"about_ca_system_score_gemma":0.0005002922,"threshold_uncertainty_score":0.018857002},"labels":[],"label_agreement":null},{"id":"W4405397753","doi":"10.5267/j.jpm.2024.10.005","title":"The mediating effect of innovative behavior on supply chain performance of water supply companies","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Emotional Intelligence and Performance","field":"Psychology","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Supply chain; Emotional intelligence; Nonprobability sampling; Supply chain management; Business; Structural equation modeling; Knowledge management; Creativity; Psychology; Marketing; Social psychology; Computer science","score_opus":0.027539190331143847,"score_gpt":0.35248631902518485,"score_spread":0.324947128694041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397753","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99840146,0.0000223755,0.00018378529,0.00007098533,0.0000021708565,0.000008342468,0.000011809223,0.0000028561183,0.0012961925],"genre_scores_gemma":[0.9996861,0.000027346292,0.00014085065,0.000011123172,0.0000024132476,0.0000048008537,0.000014286508,6.8223056e-7,0.00011235762],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99857295,0.00064807036,0.000107400556,0.00013160887,0.00024686052,0.0002930977],"domain_scores_gemma":[0.98541564,0.0071914657,0.004024181,0.0006128102,0.0011301648,0.0016257279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018591743,0.000386207,0.0002416506,0.00096219475,0.0006018304,0.0017334974,0.0003067413,0.0003986398,0.002129907],"category_scores_gemma":[0.011742353,0.00019431874,0.00038146842,0.00074011687,0.0008198934,0.00069998263,0.0013922009,0.0006645708,0.00015074137],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006877687,0.0005891558,0.9793427,0.000030884694,0.00014427165,0.00017834718,0.0018035461,0.0007148612,0.0007965549,0.0005358734,0.00007524981,0.015719727],"study_design_scores_gemma":[0.000009507301,0.00016456567,0.9949767,0.000028788661,0.000058681337,0.00004743588,0.0022492798,0.001374841,0.000396955,0.00043168382,0.00024989576,0.000011469307],"about_ca_topic_score_codex":0.0033094063,"about_ca_topic_score_gemma":0.003228121,"teacher_disagreement_score":0.0033094063,"about_ca_system_score_codex":0.0006386476,"about_ca_system_score_gemma":0.0012087777,"threshold_uncertainty_score":0.009832382},"labels":[],"label_agreement":null},{"id":"W4405397771","doi":"10.5267/j.jpm.2024.10.006","title":"Leveraging business intelligence and analytics for strategic success in the hospitality industry: Insights from hotels","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Big Data and Business Intelligence","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business intelligence; Hospitality; Business analytics; Analytics; Hospitality industry; Business; Data science; Marketing; Knowledge management; Strategic management; Process management; Computer science; Business model; Tourism; Business analysis","score_opus":0.14442934880016778,"score_gpt":0.3365154574047652,"score_spread":0.1920861086045974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397771","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9945627,0.00016414413,0.00020699226,0.0005047779,0.0000036721003,0.000010911372,0.000035160218,0.0000026974103,0.0045089475],"genre_scores_gemma":[0.998796,0.00025358892,0.0002699793,0.000059335147,0.0000037203313,0.0000041465114,0.000036234545,0.0000019104018,0.0005750852],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99925166,0.00031629592,0.00002763497,0.000033275566,0.0001514977,0.0002195283],"domain_scores_gemma":[0.99827576,0.0006542154,0.00028456727,0.000049278355,0.00033865497,0.00039756764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014637196,0.000216202,0.00016344491,0.001665491,0.0011881397,0.0034663195,0.00029049438,0.00023259588,0.001180734],"category_scores_gemma":[0.0019330997,0.000114986426,0.00016130845,0.0016261775,0.0007507342,0.0014223509,0.0015792632,0.00058546686,0.0001856671],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013324607,0.0005069279,0.58776164,0.0004878892,0.000071533264,0.0034690932,0.29194808,0.0005882379,0.0028422996,0.007684653,0.004312513,0.10019388],"study_design_scores_gemma":[0.0000039598017,0.00015996315,0.21779567,0.00023154772,0.000019775176,0.000475033,0.7670266,0.0010876897,0.0006882131,0.0012091527,0.0112752905,0.00002708659],"about_ca_topic_score_codex":0.00785641,"about_ca_topic_score_gemma":0.025659975,"teacher_disagreement_score":0.00785641,"about_ca_system_score_codex":0.0011155604,"about_ca_system_score_gemma":0.0022352631,"threshold_uncertainty_score":0.015621364},"labels":[],"label_agreement":null},{"id":"W4405397785","doi":"10.5267/j.jpm.2024.9.006","title":"The role of project management in achieving the sustainable development of smart cities","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Smart Cities and Technologies","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainable development; Process management; Business; Environmental planning; Engineering management; Architectural engineering; Engineering; Political science; Geography","score_opus":0.009785340542490476,"score_gpt":0.22898305885612338,"score_spread":0.2191977183136329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397785","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7226825,0.0029599853,0.030842211,0.018931005,0.00012899115,0.00038912782,0.000052883108,0.00009485005,0.2239184],"genre_scores_gemma":[0.9921813,0.0007585594,0.004294201,0.00023323452,0.000013578377,0.00005504301,0.000008602779,0.0000069491584,0.0024485395],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99175125,0.005705193,0.00025341753,0.00030268932,0.00105273,0.00093470357],"domain_scores_gemma":[0.99145293,0.0029719765,0.0017772922,0.00040568077,0.0012683402,0.0021237833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071457145,0.00022898913,0.00015566945,0.0012453259,0.00311109,0.005767841,0.0005766422,0.00079564645,0.00210507],"category_scores_gemma":[0.0099947555,0.000264799,0.00019722094,0.0013832492,0.0028795034,0.0038229795,0.004132802,0.0010333261,0.0003464258],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009991496,0.00082426,0.16563174,0.0011130286,0.00012036172,0.0010774132,0.05221401,0.006259398,0.0033410892,0.20232151,0.012123165,0.5548742],"study_design_scores_gemma":[0.000043002943,0.00078628876,0.24746168,0.0021129784,0.00011273054,0.0011258748,0.17830795,0.014725834,0.0041129,0.14851655,0.40251094,0.00018327574],"about_ca_topic_score_codex":0.002765634,"about_ca_topic_score_gemma":0.0051602744,"teacher_disagreement_score":0.0071457145,"about_ca_system_score_codex":0.0022789314,"about_ca_system_score_gemma":0.010781445,"threshold_uncertainty_score":0.037790596},"labels":[],"label_agreement":null},{"id":"W4405397789","doi":"10.5267/j.jpm.2024.11.001","title":"Application of reinforcement learning for integrating project risk analysis and risk response planning: A case study on construction projects","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reinforcement; Reinforcement learning; Project risk management; Risk analysis (engineering); Computer science; Engineering; Project management; Business; Systems engineering; Project management triangle; Artificial intelligence; Structural engineering","score_opus":0.07255034078815523,"score_gpt":0.40893634709894394,"score_spread":0.33638600631078874,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9352648,0.00019132895,0.059726562,0.00037358783,0.000019915096,0.00018820466,0.00007887458,0.00009636675,0.0040602726],"genre_scores_gemma":[0.97058773,0.00011146045,0.028038364,0.000017079488,0.00000684197,0.000078332974,0.000041077357,0.000010780922,0.0011084448],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986217,0.000921818,0.000047670535,0.00010598869,0.000170453,0.00013245858],"domain_scores_gemma":[0.99346066,0.005383909,0.00029459273,0.00022124489,0.0003681247,0.00027153132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026146886,0.00069162983,0.00065438193,0.00081865484,0.000864745,0.000906232,0.001090737,0.0016444151,0.0012727386],"category_scores_gemma":[0.0050453492,0.00034268544,0.0006516398,0.00081218936,0.0007462007,0.0009378935,0.00095582986,0.001159074,0.00010239804],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033653376,0.0015272646,0.009826567,0.00017317839,0.00007466473,0.0016597513,0.0006289161,0.94418037,0.0021910535,0.0052421098,0.0005571208,0.033602502],"study_design_scores_gemma":[0.00006819833,0.00041811558,0.001984911,0.000016583703,0.000025185924,0.00012088541,0.00042004554,0.99193186,0.0017701022,0.0023927426,0.000828539,0.00002291838],"about_ca_topic_score_codex":0.010671876,"about_ca_topic_score_gemma":0.009919152,"teacher_disagreement_score":0.010671876,"about_ca_system_score_codex":0.0012902692,"about_ca_system_score_gemma":0.0013396243,"threshold_uncertainty_score":0.021219552},"labels":[],"label_agreement":null},{"id":"W4405397795","doi":"10.5267/j.jpm.2024.10.002","title":"Corporate entrepreneurship, supply chain management strategies and performance in the setting of Saudi Arabia: Empirical investigation","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Islamic Finance and Banking Studies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Entrepreneurship; Business; Supply chain management; Supply chain; Industrial organization; Empirical research; Marketing; Finance; Mathematics","score_opus":0.03189346947235305,"score_gpt":0.2573706493988147,"score_spread":0.22547717992646166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397795","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9994863,0.00009124497,0.000027208975,0.000041538657,0.0000012230728,0.000006596615,0.000021530928,3.3249273e-7,0.00032397374],"genre_scores_gemma":[0.9996376,0.000117119154,0.000047940994,0.000017555805,0.0000040716936,0.0000044412036,0.00003684299,2.4038061e-7,0.00013431697],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993523,0.0002779488,0.00004648115,0.000052850977,0.00010315687,0.00016731673],"domain_scores_gemma":[0.99448884,0.0015119348,0.0020129448,0.00019405926,0.0008015166,0.0009907018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012963766,0.0003977866,0.00030374157,0.0014442619,0.001204439,0.0019105767,0.0005079347,0.000494206,0.0019096377],"category_scores_gemma":[0.0030252652,0.00021418103,0.00026223532,0.001274537,0.00090724364,0.0006701793,0.00174736,0.00067997474,0.0003696298],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000739367,0.00043533908,0.982454,0.00006889904,0.00004834034,0.0005105054,0.007954287,0.00024131293,0.00024685913,0.00046661412,0.0001965122,0.0073033376],"study_design_scores_gemma":[0.0000104368,0.00028518724,0.9294621,0.00011384182,0.00004667917,0.0003250697,0.06653423,0.0015801032,0.00023786236,0.00019602744,0.0011913358,0.000017122464],"about_ca_topic_score_codex":0.025253568,"about_ca_topic_score_gemma":0.033506446,"teacher_disagreement_score":0.025253568,"about_ca_system_score_codex":0.0011997776,"about_ca_system_score_gemma":0.00139449,"threshold_uncertainty_score":0.050213158},"labels":[],"label_agreement":null},{"id":"W4405397864","doi":"10.5267/j.jpm.2024.11.002","title":"Data-driven strategic decisions: Leveraging business analytics and big data to improve decision-making insights in the international organizations","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Big Data and Business Intelligence","field":"Business, Management and Accounting","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Big data; Business analytics; Analytics; Business; Business intelligence; Data science; Knowledge management; Process management; Computer science; Business model; Business analysis; Marketing; Data mining","score_opus":0.2192885910056906,"score_gpt":0.3668218077801713,"score_spread":0.14753321677448072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397864","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80070496,0.0025923164,0.06801205,0.036687266,0.0002580697,0.00064846425,0.00038256982,0.0002083971,0.09050584],"genre_scores_gemma":[0.9717409,0.0009273666,0.02569139,0.0006596616,0.00004555643,0.0001105608,0.00009827884,0.000018578,0.0007077028],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98896325,0.008003721,0.00033969147,0.0004195896,0.0016420258,0.00063170795],"domain_scores_gemma":[0.9792442,0.015425936,0.0017145055,0.0008580334,0.0013411045,0.001416375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01412357,0.0005773379,0.00035740327,0.0041377977,0.00199991,0.011582717,0.00082617416,0.0010215602,0.0017737157],"category_scores_gemma":[0.027489742,0.00034163962,0.00035231299,0.0043031294,0.0036713385,0.0121361315,0.004492968,0.0022679844,0.00026037428],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047423106,0.0019276273,0.12295242,0.001269728,0.00025488698,0.0013274763,0.11944427,0.006433806,0.003350709,0.23524013,0.013344092,0.49398068],"study_design_scores_gemma":[0.00008727583,0.00077364995,0.05819098,0.002535096,0.00018563437,0.0005050413,0.38787672,0.039985422,0.0061030765,0.41518876,0.088334166,0.00023431129],"about_ca_topic_score_codex":0.0020785737,"about_ca_topic_score_gemma":0.0050476887,"teacher_disagreement_score":0.01412357,"about_ca_system_score_codex":0.002375557,"about_ca_system_score_gemma":0.0061524147,"threshold_uncertainty_score":0.0746935},"labels":[],"label_agreement":null},{"id":"W4405397883","doi":"10.5267/j.jpm.2024.12.001","title":"The influence of project managing capability, IT integration, supply coordination, and process innovation to improve organizational performance of educational institutions","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Information Technology Governance and Strategy","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Process management; Process (computing); Knowledge management; Innovation process; Industrial organization; Computer science; Work in process; Marketing","score_opus":0.010723386576178153,"score_gpt":0.2754291869820143,"score_spread":0.26470580040583613,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397883","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98796356,0.00015153734,0.0009294795,0.0002112543,0.000007110331,0.000026945301,0.000018416415,0.000015374788,0.0106764175],"genre_scores_gemma":[0.9994165,0.00004250777,0.00030033558,0.000011099595,0.0000034038578,0.000006665854,0.000009265679,0.0000019820625,0.00020811753],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99152994,0.0042808806,0.00057654595,0.00046696395,0.0020920096,0.0010536445],"domain_scores_gemma":[0.9434124,0.032830454,0.0110728545,0.0018571186,0.0048845196,0.0059426515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067562247,0.0003614889,0.00023545351,0.0013112556,0.00064616755,0.0030355789,0.0003780419,0.00040953566,0.00159441],"category_scores_gemma":[0.025145274,0.00014899524,0.00037122756,0.0011067679,0.0007594871,0.0010432116,0.0016384434,0.00059610774,0.00017602934],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028181868,0.00089446217,0.8962799,0.00017784661,0.0003335658,0.00038642276,0.0032286786,0.0058850697,0.0037330263,0.0028965545,0.0007145373,0.08518816],"study_design_scores_gemma":[0.000015935304,0.00064560794,0.98583037,0.0001141394,0.00015446993,0.00015024061,0.0029976352,0.005513137,0.0021856094,0.00076238427,0.0016033461,0.000027195498],"about_ca_topic_score_codex":0.0023447536,"about_ca_topic_score_gemma":0.0028702563,"teacher_disagreement_score":0.0067562247,"about_ca_system_score_codex":0.0012481813,"about_ca_system_score_gemma":0.0035580925,"threshold_uncertainty_score":0.03573078},"labels":[],"label_agreement":null},{"id":"W4405397884","doi":"10.5267/j.jpm.2024.10.001","title":"Influence of information technology on project risk management: The mediating role of risk identification","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"King Khalid University","keywords":"Identification (biology); Risk management; Risk analysis (engineering); Knowledge management; Business; Process management; Computer science","score_opus":0.01899984194348094,"score_gpt":0.3291685218807655,"score_spread":0.3101686799372846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9747395,0.00058580114,0.004385348,0.00084395765,0.000019498355,0.00008736265,0.000034739693,0.000025976975,0.01927778],"genre_scores_gemma":[0.9978551,0.00030173818,0.0012895985,0.000033626722,0.000008013261,0.000023114877,0.000009779142,0.0000035336595,0.00047553086],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9910924,0.005952823,0.00039573654,0.0004280963,0.0014204006,0.00071053836],"domain_scores_gemma":[0.9433662,0.045290686,0.0056580026,0.0012128983,0.0023241043,0.0021481635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054906365,0.0007337263,0.00032161342,0.0016094208,0.0008391656,0.003308857,0.0004268855,0.000635534,0.0045997156],"category_scores_gemma":[0.031369958,0.00030675327,0.0006486854,0.00095532223,0.0013915714,0.00204921,0.002913141,0.0009791235,0.0002854496],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054492377,0.0019731184,0.75524276,0.00081986166,0.00064313674,0.0016859185,0.027050756,0.0037661593,0.0073601664,0.018733487,0.0006319921,0.18154772],"study_design_scores_gemma":[0.00009634086,0.0021875978,0.9053133,0.0015416787,0.0015927617,0.0013617702,0.040952735,0.014088832,0.010379353,0.011276727,0.011074082,0.00013480458],"about_ca_topic_score_codex":0.0019783154,"about_ca_topic_score_gemma":0.0016342751,"teacher_disagreement_score":0.0054906365,"about_ca_system_score_codex":0.0010888444,"about_ca_system_score_gemma":0.0036390903,"threshold_uncertainty_score":0.029037595},"labels":[],"label_agreement":null},{"id":"W4405397889","doi":"10.5267/j.jpm.2024.9.004","title":"The transportation efficiency of cargo truck drivers from Thailand to Lao PDR","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Maritime Ports and Logistics","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Khon Kaen University; China Railway","keywords":"Truck; Transport engineering; Business; Engineering; Automotive engineering","score_opus":0.008102555280664106,"score_gpt":0.22679939448932931,"score_spread":0.2186968392086652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397889","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9993461,0.00001818544,0.000025938009,0.000014044807,9.638361e-7,0.0000019698216,0.000057593315,6.5660873e-7,0.0005345755],"genre_scores_gemma":[0.9993206,0.00006324865,0.00002864636,0.000007712306,0.0000011314014,0.0000030778326,0.000100826815,8.671314e-7,0.00047386688],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99979585,0.000050689217,0.000026253567,0.00002955486,0.000058908172,0.00003879138],"domain_scores_gemma":[0.99919266,0.00014842107,0.0002913477,0.000024492523,0.00021270415,0.00013036252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028501207,0.00016917233,0.00008887068,0.00043335176,0.00036616498,0.0007759391,0.00012762597,0.00014033337,0.001831484],"category_scores_gemma":[0.0012270976,0.00009617273,0.00019866171,0.00054871006,0.00018635792,0.00039064948,0.00034231463,0.00023989355,0.00025058282],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006404069,0.000043558317,0.98456836,0.000041079325,0.00002863858,0.00027961578,0.007001968,0.00019208017,0.0008533356,0.000059750804,0.00018694693,0.006680649],"study_design_scores_gemma":[0.0000020795214,0.000118366945,0.9735738,0.000017914812,0.000019590381,0.00033922875,0.024188148,0.00043884787,0.00035683386,0.000022533686,0.0009098955,0.000012814634],"about_ca_topic_score_codex":0.015135447,"about_ca_topic_score_gemma":0.019025907,"teacher_disagreement_score":0.015135447,"about_ca_system_score_codex":0.00038974392,"about_ca_system_score_gemma":0.00029173447,"threshold_uncertainty_score":0.030094683},"labels":[],"label_agreement":null},{"id":"W4405397991","doi":"10.5267/j.jpm.2024.10.003","title":"The impact of Islamic attributes and motivations on visitor satisfaction and word of mouth in halal supply chain management","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Halal products and consumer behavior","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Visitor pattern; Word of mouth; Islam; Supply chain; Business; Marketing; Supply chain management; Advertising; Computer science; History","score_opus":0.02163446069647847,"score_gpt":0.33347598410451706,"score_spread":0.3118415234080386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405397991","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988649,0.000026823767,0.00004596677,0.00005664469,0.0000019577851,0.000004920477,0.000011988954,0.0000011611512,0.0009856547],"genre_scores_gemma":[0.9996043,0.000029328248,0.00006232146,0.000014637305,0.0000013615218,0.0000034992174,0.0000165026,7.4069493e-7,0.00026743955],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992781,0.00031663058,0.00004870779,0.000041575848,0.00016846765,0.0001464985],"domain_scores_gemma":[0.9959668,0.001283813,0.0013460746,0.00012963789,0.0004903243,0.0007833821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009021303,0.00014750897,0.00016314752,0.00042541613,0.0006230504,0.0015733488,0.00019002301,0.00029923607,0.0025262223],"category_scores_gemma":[0.003858687,0.000107874956,0.00031666597,0.00044238396,0.00074072904,0.00052174815,0.00088867714,0.0005757262,0.00019908743],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014201776,0.00034761583,0.96937436,0.000057523088,0.00004890565,0.00027707758,0.009056049,0.00022953545,0.0008437814,0.00047985648,0.00032827767,0.018814903],"study_design_scores_gemma":[0.0000035052826,0.00015191914,0.9764885,0.000025106483,0.00001593216,0.00008239992,0.021606743,0.0006543727,0.00016438239,0.00013424717,0.0006600414,0.000012936041],"about_ca_topic_score_codex":0.004667209,"about_ca_topic_score_gemma":0.0073298807,"teacher_disagreement_score":0.004667209,"about_ca_system_score_codex":0.00072838285,"about_ca_system_score_gemma":0.00075516704,"threshold_uncertainty_score":0.009280086},"labels":[],"label_agreement":null},{"id":"W4405398085","doi":"10.5267/j.jpm.2024.10.004","title":"The role of big data in improving the balanced scorecard in Jordanian commercial banks: A field study","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Islamic Finance and Banking Studies","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Balanced scorecard; Field (mathematics); Business; Process management; Mathematics","score_opus":0.029087747680146055,"score_gpt":0.26968095372237383,"score_spread":0.24059320604222778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405398085","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9974146,0.00015336796,0.00038531612,0.00040152355,0.000009018432,0.000114708666,0.000019277244,0.000002281635,0.0014997795],"genre_scores_gemma":[0.99776864,0.00024319101,0.0012422866,0.00018549069,0.000018887453,0.000067998175,0.000022137505,0.0000015031151,0.00044997165],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99427974,0.0034392856,0.0003346349,0.00034327546,0.0010256716,0.00057745166],"domain_scores_gemma":[0.97454745,0.011607932,0.0038247074,0.00081137684,0.007097505,0.0021110745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01584296,0.00033811847,0.00036719974,0.0021159984,0.001500632,0.0026203191,0.0005307275,0.00066382164,0.001306376],"category_scores_gemma":[0.015087699,0.00027281657,0.00021948662,0.0020706365,0.00208196,0.0026101328,0.0010208864,0.0009272365,0.00016277847],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011847,0.008908627,0.5956959,0.0013024657,0.00009455089,0.0018934198,0.14842921,0.0013325391,0.0053706705,0.009392239,0.0049416907,0.22145402],"study_design_scores_gemma":[0.00015946463,0.0059065903,0.5515415,0.0008751739,0.00008217739,0.0007105244,0.40512785,0.005053174,0.0044600186,0.0029105018,0.023050942,0.00012206934],"about_ca_topic_score_codex":0.0020346155,"about_ca_topic_score_gemma":0.0037142036,"teacher_disagreement_score":0.01584296,"about_ca_system_score_codex":0.002226819,"about_ca_system_score_gemma":0.0043011745,"threshold_uncertainty_score":0.08378661},"labels":[],"label_agreement":null},{"id":"W4405398107","doi":"10.5267/j.jpm.2024.12.002","title":"Resource-constrained project scheduling problem: Review of recent developments","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Scheduling (production processes); Operations research; Mathematical optimization; Engineering; Mathematics","score_opus":0.13414712206995055,"score_gpt":0.4174762131630813,"score_spread":0.28332909109313076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405398107","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010021151,0.98886555,0.0052237,0.0008485393,0.00026175365,0.00001215281,0.000036898342,0.000018140787,0.003731124],"genre_scores_gemma":[0.0081975525,0.9857303,0.004504857,0.00023758644,0.000661281,0.000017261726,0.000105811705,0.0000112419575,0.00053401],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994986,0.00011345649,0.000065728986,0.00012798027,0.00015309143,0.000041065556],"domain_scores_gemma":[0.9981919,0.0012776981,0.00014037506,0.000035703095,0.00027811207,0.00007624392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001407067,0.0012188248,0.0012963859,0.0018812349,0.0004232244,0.0018919376,0.0010267822,0.0010780297,0.0025616165],"category_scores_gemma":[0.0025527123,0.0005721628,0.00085224706,0.0048359022,0.0007147786,0.0019641472,0.00079039147,0.0015885335,0.0007342621],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104500505,0.00016425508,0.0008520129,0.01710718,0.0001598511,0.00021611153,0.00017676632,0.020193992,0.0008924243,0.04182927,0.023369774,0.89493394],"study_design_scores_gemma":[0.000041026113,0.0003491482,0.0021093213,0.008682309,0.00035101347,0.0012591291,0.0005393046,0.022030879,0.0009966685,0.041786484,0.9217418,0.00011291756],"about_ca_topic_score_codex":0.0032514804,"about_ca_topic_score_gemma":0.0026814446,"teacher_disagreement_score":0.0032514804,"about_ca_system_score_codex":0.0010037597,"about_ca_system_score_gemma":0.002322831,"threshold_uncertainty_score":0.008569479},"labels":[],"label_agreement":null},{"id":"W4405398125","doi":"10.5267/j.jpm.2024.9.005","title":"Risk management practices: A comparative study of Islamic and conventional banks in the MENA region","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Islamic Finance and Banking Studies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"King Khalid University","keywords":"Islam; Business; Islamic banking; Geography","score_opus":0.046526163693142414,"score_gpt":0.31436973318551437,"score_spread":0.267843569492372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405398125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99970144,0.00004667443,0.000017719469,0.00002575027,0.0000010961521,0.000004442915,0.0000054571865,2.3655186e-7,0.00019727823],"genre_scores_gemma":[0.99950576,0.00011593107,0.00006323076,0.00003234128,0.0000035528938,0.000009096934,0.00001068307,5.336418e-7,0.00025895325],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993594,0.00025149537,0.00005045921,0.00008070613,0.00012726485,0.0001306119],"domain_scores_gemma":[0.99837226,0.0005770937,0.0005432656,0.000056208955,0.00019331019,0.00025793022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014834554,0.00024443757,0.00037798332,0.0009783659,0.0019024985,0.0013048291,0.00035471423,0.00056686,0.001734725],"category_scores_gemma":[0.002796586,0.00027775965,0.0002147806,0.0013002985,0.0010778686,0.00095613085,0.000755022,0.0005091614,0.00024608758],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001916734,0.00085105153,0.6827839,0.00013779082,0.000043396652,0.0020389573,0.29150262,0.000088729474,0.0023700874,0.0005602352,0.00025732088,0.01917425],"study_design_scores_gemma":[0.0000089593,0.0006630123,0.70300746,0.00005877191,0.000019996918,0.00095097924,0.29318076,0.00014820317,0.00026502,0.00009155444,0.0015868613,0.000018362281],"about_ca_topic_score_codex":0.005010327,"about_ca_topic_score_gemma":0.012268489,"teacher_disagreement_score":0.005010327,"about_ca_system_score_codex":0.00089309417,"about_ca_system_score_gemma":0.0009884561,"threshold_uncertainty_score":0.00996232},"labels":[],"label_agreement":null},{"id":"W4408170934","doi":"10.5267/j.jpm.2024.12.005","title":"Firm performance through quality project management aspects: Environmental dynamism and digital innovation approaches","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Business and Economic Development","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Dynamism; Business; Quality (philosophy); Environmental resource management; Process management; Environmental economics; Knowledge management; Engineering management; Environmental planning; Engineering; Computer science; Environmental science; Economics","score_opus":0.034789591213375735,"score_gpt":0.25117828377672813,"score_spread":0.21638869256335239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408170934","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96068376,0.0005217719,0.0031445906,0.0007315755,0.000013860908,0.00008842225,0.00005866965,0.000011463951,0.034745876],"genre_scores_gemma":[0.99891007,0.00009497665,0.00044008784,0.000015261268,0.000003889436,0.0000139847225,0.000012849758,0.000001134193,0.0005076714],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99717015,0.0012281641,0.00017735396,0.00027929037,0.0007910687,0.000354017],"domain_scores_gemma":[0.99150676,0.0042790133,0.0022950568,0.00032336253,0.00085069775,0.0007451918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034131457,0.0002614285,0.00021440821,0.0023886757,0.00059831113,0.0033403914,0.0003810045,0.0004431289,0.0026541827],"category_scores_gemma":[0.0053915414,0.00012541786,0.00048275403,0.002190662,0.0011806143,0.0018272506,0.0020118752,0.0004927966,0.00016609547],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001480137,0.001145137,0.8272247,0.00029712325,0.00024023483,0.00028275797,0.0046030455,0.006738083,0.00071964785,0.013055818,0.00071926735,0.14482617],"study_design_scores_gemma":[0.000022563425,0.00049883174,0.9501824,0.00028865077,0.00014498472,0.00019828216,0.014470128,0.020464646,0.0010357259,0.007901276,0.0047574015,0.000035200123],"about_ca_topic_score_codex":0.002480051,"about_ca_topic_score_gemma":0.0041711316,"teacher_disagreement_score":0.0034131457,"about_ca_system_score_codex":0.0024878404,"about_ca_system_score_gemma":0.002163315,"threshold_uncertainty_score":0.018050611},"labels":[],"label_agreement":null},{"id":"W4408171008","doi":"10.5267/j.jpm.2025.1.003","title":"Corporate social responsibility and its role in the impact of marketing tools on strategic marketing","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Marketing and Advertising Strategies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Marketing; Corporate social responsibility; Social marketing; Marketing management; Marketing research; Marketing mix; Public relations; Political science","score_opus":0.04918192584124032,"score_gpt":0.30998276289767634,"score_spread":0.26080083705643603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171008","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92360467,0.0006367931,0.0018222702,0.0023681712,0.000033797725,0.000037463335,0.000017016491,0.000011380563,0.07146845],"genre_scores_gemma":[0.9992773,0.00011482068,0.00018341275,0.000042583964,0.0000083534815,0.000004472768,0.0000029161226,0.000002549158,0.00036370178],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9934187,0.0040163104,0.00013577359,0.00031894277,0.0013504146,0.0007600209],"domain_scores_gemma":[0.95936006,0.02709352,0.006022855,0.0011415117,0.0027414104,0.0036406005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052121314,0.00039381764,0.00027126528,0.0017802691,0.0013809496,0.0037908757,0.00040502244,0.00054204755,0.0040049753],"category_scores_gemma":[0.017100852,0.00015400554,0.00045187198,0.0007660902,0.00479671,0.0026699696,0.0032062817,0.0011403739,0.0001913501],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041812297,0.002420359,0.6501794,0.0004768002,0.00044160755,0.0010914138,0.053560082,0.0016946082,0.0037905348,0.12527943,0.0010619242,0.15958565],"study_design_scores_gemma":[0.00005376852,0.0007518889,0.86218685,0.00050830026,0.00024607344,0.00041303854,0.06348431,0.0032660938,0.002538678,0.049605474,0.016832786,0.000112745314],"about_ca_topic_score_codex":0.0030739403,"about_ca_topic_score_gemma":0.004011377,"teacher_disagreement_score":0.0052121314,"about_ca_system_score_codex":0.002001481,"about_ca_system_score_gemma":0.0037729896,"threshold_uncertainty_score":0.027564704},"labels":[],"label_agreement":null},{"id":"W4408171021","doi":"10.5267/j.jpm.2025.1.002","title":"Marketing intelligence in digital age: How business intelligence tools drive e-marketing strategies","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Big Data and Business Intelligence","field":"Business, Management and Accounting","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Marketing; Digital marketing; Business; Business intelligence; Marketing and artificial intelligence; Computer science; Knowledge management; Artificial intelligence","score_opus":0.048734382294349184,"score_gpt":0.30504909087033133,"score_spread":0.25631470857598215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171021","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9364408,0.00093930593,0.001694199,0.0029231624,0.000024510937,0.000045474637,0.000075350465,0.00002321937,0.0578339],"genre_scores_gemma":[0.997072,0.0003662438,0.0006091494,0.00019179402,0.000013333879,0.000009049738,0.000023725368,0.00000622082,0.0017085297],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990134,0.00040224695,0.00003890961,0.00012246518,0.0002381369,0.00018472954],"domain_scores_gemma":[0.9949174,0.0025613788,0.0012163561,0.00023069816,0.0004901553,0.0005839589],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015430842,0.0003241746,0.00017850928,0.002282875,0.0008166953,0.0077758078,0.00037330258,0.0007644005,0.0061553866],"category_scores_gemma":[0.0070291073,0.00020075784,0.00024265052,0.0016573644,0.0013460142,0.0064438637,0.0018465364,0.0010470209,0.00091017096],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020773351,0.001485144,0.6906523,0.00024743043,0.00016822452,0.00076699624,0.050927,0.0011778068,0.0016113239,0.0579316,0.0031465094,0.19167794],"study_design_scores_gemma":[0.000043758777,0.00030660056,0.7978165,0.00040328896,0.00016593892,0.00046846154,0.0981039,0.00908029,0.0020731578,0.048202954,0.043259624,0.00007555583],"about_ca_topic_score_codex":0.0029119097,"about_ca_topic_score_gemma":0.0031416514,"teacher_disagreement_score":0.0077758078,"about_ca_system_score_codex":0.0012186042,"about_ca_system_score_gemma":0.0012497391,"threshold_uncertainty_score":0.020591855},"labels":[],"label_agreement":null},{"id":"W4408171284","doi":"10.5267/j.jpm.2025.1.001","title":"Selecting a priority strategy to enhance the ambidextrous leadership competence of project managers in the telecommunication industries","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Information Technology Governance and Strategy","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Competence (human resources); Knowledge management; Process management; Telecommunications; Engineering management; Engineering; Management; Computer science; Economics","score_opus":0.047262680210995375,"score_gpt":0.312913984585103,"score_spread":0.2656513043741076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171284","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79693025,0.00087717717,0.15782927,0.0035088393,0.00018070752,0.0015687195,0.000045355813,0.00027874162,0.038780972],"genre_scores_gemma":[0.8671335,0.00050060084,0.12623055,0.00026136858,0.000013906892,0.00042521415,0.000063447005,0.000021483575,0.0053497786],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.997919,0.0010635711,0.00012252225,0.00011686296,0.0005072502,0.00027076594],"domain_scores_gemma":[0.9971566,0.000627641,0.00029183913,0.00006618357,0.0010215839,0.00083616626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033039122,0.00037729964,0.00024320478,0.0016346041,0.0012084483,0.0026344475,0.0004385923,0.00045728387,0.0021226944],"category_scores_gemma":[0.0049425047,0.00017919585,0.00022172334,0.0009083559,0.00038000406,0.0012615396,0.0011682916,0.00053523947,0.0004582284],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002828496,0.0018409068,0.035466455,0.0012577814,0.000077178025,0.00080926245,0.014633544,0.0033311858,0.031239515,0.020888606,0.0075731915,0.88259953],"study_design_scores_gemma":[0.0011481462,0.014135937,0.26933533,0.0030508337,0.00051051157,0.003278903,0.15916955,0.124791294,0.10485673,0.08076026,0.23838496,0.0005775483],"about_ca_topic_score_codex":0.001342303,"about_ca_topic_score_gemma":0.00380872,"teacher_disagreement_score":0.0033039122,"about_ca_system_score_codex":0.0014417116,"about_ca_system_score_gemma":0.0059777424,"threshold_uncertainty_score":0.017472982},"labels":[],"label_agreement":null},{"id":"W4408171442","doi":"10.5267/j.jpm.2024.12.006","title":"Strategic planning techniques and tools in business enterprises: A systematic literature analysis","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Organizational Leadership and Management Strategies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process management; Business; Strategic planning; Systematic review; Management science; Engineering; Political science; Marketing; MEDLINE","score_opus":0.028309662906909307,"score_gpt":0.2807119591473173,"score_spread":0.252402296240408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171442","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023159448,0.94821537,0.012399357,0.0026290088,0.0003693738,0.005409181,0.0017783708,0.00005337486,0.005986518],"genre_scores_gemma":[0.10644068,0.84123856,0.043267246,0.0010644356,0.0001374827,0.0058208457,0.0013989827,0.000022819597,0.0006089507],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9799442,0.008030664,0.0054679094,0.00080863043,0.0053091603,0.00043939537],"domain_scores_gemma":[0.93055016,0.051559668,0.0064222985,0.001248021,0.009721804,0.0004980716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025250057,0.0012624334,0.00258066,0.06130655,0.0018728176,0.004572097,0.0012433325,0.0013394813,0.0016168515],"category_scores_gemma":[0.049827952,0.00092577335,0.0026425663,0.048784308,0.001549849,0.0058787246,0.0024135858,0.0013785469,0.0002815223],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013264029,0.00018844761,0.0090354625,0.44640034,0.0016780877,0.0014635691,0.009216853,0.0014530544,0.0014569986,0.0106481565,0.005947749,0.51237863],"study_design_scores_gemma":[0.000078106605,0.0003708394,0.012634201,0.8475192,0.005913988,0.0016787265,0.018733358,0.0011027395,0.0013431315,0.0063948594,0.10409491,0.00013574323],"about_ca_topic_score_codex":0.008140263,"about_ca_topic_score_gemma":0.023472587,"teacher_disagreement_score":0.06130655,"about_ca_system_score_codex":0.006636189,"about_ca_system_score_gemma":0.03536346,"threshold_uncertainty_score":0.1335367},"labels":[],"label_agreement":null},{"id":"W4408171536","doi":"10.5267/j.jpm.2025.1.004","title":"Green project management competencies and sustainable development goals (SDGs): Empirical evidence","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Sustainable development; Empirical evidence; Business; Process management; Environmental resource management; Environmental planning; Knowledge management; Political science; Computer science; Economics; Environmental science","score_opus":0.14960398291325985,"score_gpt":0.4148512851105501,"score_spread":0.2652473021972902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171536","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9481109,0.01282381,0.0027841446,0.0046417904,0.00007031026,0.000096033844,0.00031410213,0.000026727697,0.03113224],"genre_scores_gemma":[0.99189067,0.0056931567,0.0016087632,0.00022651482,0.000015433148,0.000036473466,0.00010449291,0.0000060072875,0.0004184233],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9967996,0.00086998247,0.0002680618,0.00032034458,0.0015110628,0.00023099445],"domain_scores_gemma":[0.94638073,0.03277795,0.0119044855,0.0009234096,0.0054553202,0.0025581804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004778539,0.00031283882,0.00032720415,0.0022101998,0.00051700184,0.0012555401,0.00067417766,0.00055022206,0.003528728],"category_scores_gemma":[0.02814001,0.00027902145,0.0003379583,0.0022258922,0.0015316133,0.0018545972,0.0023988946,0.0011253319,0.00028194697],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053775704,0.0007367993,0.75064284,0.0025230383,0.0001666988,0.00021335583,0.0042941337,0.00093368086,0.00023596821,0.0066383025,0.001950248,0.2316112],"study_design_scores_gemma":[0.0000062216614,0.00010639765,0.97554094,0.0022338305,0.00006166933,0.0001965886,0.00851023,0.0006261268,0.00029530816,0.0021560346,0.010247543,0.00001907039],"about_ca_topic_score_codex":0.0057641645,"about_ca_topic_score_gemma":0.011131682,"teacher_disagreement_score":0.0057641645,"about_ca_system_score_codex":0.0010477254,"about_ca_system_score_gemma":0.0045846864,"threshold_uncertainty_score":0.025271595},"labels":[],"label_agreement":null},{"id":"W4408171539","doi":"10.5267/j.jpm.2025.1.005","title":"The use of big data and the internet of things leadership and organizational culture: The innovative capacity of the Amman Stock Exchange","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Organizational and Employee Performance","field":"Computer Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Organizational culture; Big data; Business; Stock exchange; Knowledge management; Internet of Things; Public relations; Computer science; Finance; Political science; World Wide Web","score_opus":0.11919322955067008,"score_gpt":0.26645578401641723,"score_spread":0.14726255446574715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171539","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980154,0.000054006065,0.00004256935,0.0002992751,0.000004896411,0.0000033031838,0.000013076313,0.0000011631815,0.0015662443],"genre_scores_gemma":[0.9992835,0.00005351967,0.00004474206,0.000045442353,0.000005226745,0.000002566052,0.000014568625,8.884207e-7,0.0005495566],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994228,0.00015621938,0.00002949243,0.0000559127,0.0001886192,0.0001470166],"domain_scores_gemma":[0.99780685,0.0005463037,0.0007716481,0.00007932473,0.00022539336,0.00057048205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013908744,0.00015050253,0.000117015494,0.00078896777,0.0010287086,0.0027313018,0.00025686042,0.00023654143,0.0018092686],"category_scores_gemma":[0.0017569305,0.00009642424,0.00015006046,0.00063770707,0.0006188762,0.0012566012,0.0011477268,0.00050216774,0.00017894572],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060813985,0.00022059346,0.96908486,0.0000236117,0.000034301167,0.00044698582,0.007932869,0.00015671042,0.00084266026,0.001047245,0.0006165972,0.019532636],"study_design_scores_gemma":[0.0000037324621,0.000087476714,0.9759832,0.000033380875,0.000012642516,0.00012280449,0.020175556,0.0006560947,0.0003943262,0.00024594704,0.0022711358,0.000013642053],"about_ca_topic_score_codex":0.005151792,"about_ca_topic_score_gemma":0.009012436,"teacher_disagreement_score":0.005151792,"about_ca_system_score_codex":0.000809835,"about_ca_system_score_gemma":0.0010472419,"threshold_uncertainty_score":0.010243595},"labels":[],"label_agreement":null},{"id":"W4408171580","doi":"10.5267/j.jpm.2025.2.005","title":"The impact of management style and supply chain coordination on the lean projects implementation to increase the operational performanc","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Supply chain; Business; Process management; Lean manufacturing; Supply chain management; Style (visual arts); Operations management; Engineering; Marketing; Geography","score_opus":0.019249240480974424,"score_gpt":0.3102021380016213,"score_spread":0.29095289752064685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171580","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9941684,0.00006273346,0.0006177012,0.00017042301,0.000006580692,0.000016538906,0.000012677433,0.0000063012544,0.0049385563],"genre_scores_gemma":[0.9991297,0.00005179507,0.00044498278,0.00001798223,0.0000028694674,0.0000047679487,0.000009697549,0.0000020863977,0.00033628437],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99567395,0.0021704885,0.00024968723,0.00022520861,0.0011443158,0.0005362737],"domain_scores_gemma":[0.98687077,0.0043216613,0.0041721864,0.00072828436,0.0020775592,0.0018295846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00396132,0.00024407684,0.00012952766,0.0005626107,0.0005007428,0.0020052132,0.00024344352,0.00019178481,0.0018003278],"category_scores_gemma":[0.009275836,0.0001376045,0.00024888394,0.00070518575,0.000516708,0.00075078674,0.0010492536,0.0005537463,0.00022027828],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015380072,0.00056488335,0.8835067,0.0001092478,0.00010884284,0.0003140699,0.0051031527,0.0019164408,0.0029811936,0.0011471296,0.0004985192,0.10359611],"study_design_scores_gemma":[0.000012208013,0.00047791543,0.98706716,0.00006591363,0.000040934625,0.00011090751,0.0057858056,0.002823125,0.0012340237,0.00045674932,0.001908656,0.000016500908],"about_ca_topic_score_codex":0.002305168,"about_ca_topic_score_gemma":0.0039537903,"teacher_disagreement_score":0.00396132,"about_ca_system_score_codex":0.0010349295,"about_ca_system_score_gemma":0.0020767564,"threshold_uncertainty_score":0.020949721},"labels":[],"label_agreement":null},{"id":"W4408171586","doi":"10.5267/j.jpm.2025.2.004","title":"The influence of balanced scorecard dimension on total quality management and sustainable performance as a mediating variable: An empirical study in KSA services projects ,","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Accounting and Organizational Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Balanced scorecard; Dimension (graph theory); Business; Empirical research; Variable (mathematics); Process management; Total quality management; Operations management; Environmental economics; Mathematics; Statistics; Engineering; Economics; Marketing; Lean manufacturing","score_opus":0.01062849007832266,"score_gpt":0.28830441757306174,"score_spread":0.27767592749473907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171586","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99957305,0.000029617508,0.000104309926,0.000026053367,0.0000010298097,0.000007009621,0.000010777036,5.5158495e-7,0.00024755005],"genre_scores_gemma":[0.99968445,0.00003790099,0.00011788048,0.000007186087,0.0000012682044,0.0000070881974,0.000016914715,5.4939886e-7,0.00012681574],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9965404,0.0016262084,0.00018506686,0.00031891535,0.0007809725,0.00054847257],"domain_scores_gemma":[0.98358834,0.007171647,0.00468172,0.00062219903,0.0021965895,0.0017395669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048502637,0.00040562503,0.00031746793,0.0012833232,0.0010055342,0.0017111306,0.00043544418,0.00038264613,0.0019752448],"category_scores_gemma":[0.0113102235,0.00027705668,0.00043394286,0.0015635162,0.0009596623,0.0011132525,0.0012916063,0.0005685523,0.00022497232],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012646336,0.00067185995,0.97739923,0.00007537126,0.00007843412,0.00029480687,0.005534682,0.00043281307,0.0004280004,0.00082362373,0.00015187258,0.013982821],"study_design_scores_gemma":[0.0000083334,0.00045339466,0.9797656,0.00007714058,0.000075556905,0.00014418465,0.015623896,0.0021926865,0.00041700611,0.00027278252,0.0009535557,0.000015943153],"about_ca_topic_score_codex":0.014074289,"about_ca_topic_score_gemma":0.018309448,"teacher_disagreement_score":0.014074289,"about_ca_system_score_codex":0.0018673072,"about_ca_system_score_gemma":0.004240526,"threshold_uncertainty_score":0.027984738},"labels":[],"label_agreement":null},{"id":"W4408171656","doi":"10.5267/j.jpm.2025.1.006","title":"The influence of organizational culture on project portfolio management practices within the healthcare sector","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Human Resource and Talent Management","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Organizational culture; Health care; Portfolio; Project portfolio management; Knowledge management; Business administration; Process management; Management; Project management; Economics; Finance; Computer science; Economic growth","score_opus":0.020522342099262653,"score_gpt":0.292156611433822,"score_spread":0.27163426933455936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171656","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9967951,0.00020765244,0.00034713742,0.00035748212,0.000012375718,0.000013431781,0.000009814847,0.000003231914,0.0022538225],"genre_scores_gemma":[0.99960154,0.0000956135,0.0001261872,0.00005592228,0.0000047369253,0.0000062254308,0.000006065638,0.0000016234123,0.00010197493],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9870111,0.008459305,0.00086516066,0.00046418037,0.0020350802,0.0011652017],"domain_scores_gemma":[0.9482225,0.02491924,0.014173715,0.0021145216,0.004484268,0.0060857283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008404374,0.00016918719,0.00020376765,0.00089922966,0.001594889,0.0028598406,0.0004107945,0.0003374757,0.001229632],"category_scores_gemma":[0.03467062,0.00017855897,0.00022240152,0.00090044964,0.0015382562,0.0010747726,0.0018562751,0.0007193146,0.00016481978],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010929483,0.00037898708,0.9145418,0.00009767383,0.0001295409,0.00020196765,0.027326895,0.00029249175,0.0005274732,0.0006386904,0.00044936864,0.055305786],"study_design_scores_gemma":[0.0000070347296,0.00033548035,0.9559687,0.00013638774,0.000035529632,0.00015431778,0.040733024,0.000488372,0.0003189076,0.00029917766,0.0014966447,0.000026359881],"about_ca_topic_score_codex":0.0061769923,"about_ca_topic_score_gemma":0.009327044,"teacher_disagreement_score":0.008404374,"about_ca_system_score_codex":0.0017731756,"about_ca_system_score_gemma":0.0036013848,"threshold_uncertainty_score":0.044447124},"labels":[],"label_agreement":null},{"id":"W4408171720","doi":"10.5267/j.jpm.2025.1.007","title":"The impact of project management skills, IT integration, supply chain coordination, process innovation, and communication language on organizational performance in educational institutions","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Information Technology Governance and Strategy","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Process management; Knowledge management; Process (computing); Supply chain management; Supply chain; Computer science; Marketing","score_opus":0.009917038203080425,"score_gpt":0.29967041221200097,"score_spread":0.28975337400892054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9978734,0.000038747967,0.000078158024,0.00008012923,0.0000014116489,0.000005988884,0.000008541389,0.0000024212075,0.0019111309],"genre_scores_gemma":[0.99977344,0.00002446132,0.000067698,0.0000071738664,0.0000022841582,0.0000033585611,0.000008794754,6.3304407e-7,0.000112102105],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.993644,0.003075706,0.0005026927,0.00032892017,0.0012939435,0.001154645],"domain_scores_gemma":[0.9455624,0.024041612,0.015657136,0.0016857161,0.004589964,0.008463164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0070270677,0.00029613887,0.00021724471,0.0014308167,0.0009474769,0.0031056525,0.00038190236,0.00040658514,0.0018042412],"category_scores_gemma":[0.024557227,0.00015928692,0.000215886,0.0011134985,0.0015948298,0.0016632599,0.0027258887,0.00074944034,0.00029128342],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017782222,0.00096802285,0.94349855,0.00009276623,0.000078569996,0.00029725392,0.0057970276,0.001708951,0.00095323403,0.00096882915,0.00026032646,0.045198604],"study_design_scores_gemma":[0.00000923343,0.0005045392,0.9867732,0.000057004912,0.000021720767,0.00006767983,0.009646594,0.0012095968,0.00058582885,0.00043270484,0.00067526754,0.000016729758],"about_ca_topic_score_codex":0.0023913237,"about_ca_topic_score_gemma":0.0035711331,"teacher_disagreement_score":0.0070270677,"about_ca_system_score_codex":0.0015990478,"about_ca_system_score_gemma":0.003497205,"threshold_uncertainty_score":0.03716314},"labels":[],"label_agreement":null},{"id":"W4408171765","doi":"10.5267/j.jpm.2025.2.006","title":"The impact of information technology application on project performance: The mediating role of knowledge management","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Technology Adoption and User Behaviour","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Knowledge management; Business; Information technology; Process management; Computer science","score_opus":0.029786216904451726,"score_gpt":0.3944531827028928,"score_spread":0.3646669657984411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171765","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99158996,0.00020922921,0.0009718174,0.00025128823,0.000005803061,0.00004007638,0.000016117969,0.000008616801,0.00690711],"genre_scores_gemma":[0.9989569,0.00012005454,0.00046708953,0.000012427338,0.0000042594174,0.000024266546,0.000010082775,0.0000018330587,0.00040299806],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9921441,0.005558636,0.00028813552,0.00026762582,0.0010364973,0.0007050272],"domain_scores_gemma":[0.9303131,0.054481775,0.006156786,0.0017699645,0.0034401435,0.0038381286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006562095,0.00040755214,0.00029866918,0.0008728752,0.0006327577,0.0023316504,0.00048272638,0.00066258217,0.0036441183],"category_scores_gemma":[0.040028572,0.00022056176,0.00040426772,0.00077913544,0.0008975916,0.0016737077,0.0023133822,0.00084823475,0.00026855734],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014208175,0.005670536,0.649014,0.001155068,0.0005186843,0.0015483928,0.017615031,0.00515401,0.011733751,0.008109611,0.0006202763,0.2974398],"study_design_scores_gemma":[0.00008219002,0.0037088774,0.96602595,0.00062448776,0.0004390105,0.00047860912,0.008734239,0.0065083825,0.006126822,0.004290335,0.0029261215,0.000054946824],"about_ca_topic_score_codex":0.0017878176,"about_ca_topic_score_gemma":0.001798917,"teacher_disagreement_score":0.006562095,"about_ca_system_score_codex":0.00086952146,"about_ca_system_score_gemma":0.003709344,"threshold_uncertainty_score":0.03470409},"labels":[],"label_agreement":null},{"id":"W4408171776","doi":"10.5267/j.jpm.2025.3.001","title":"Technical capabilities and work environment in power plant operational performance: A project management assessmen","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Systems engineering; Project management; Engineering management; Engineering; Computer science; Process management; Environmental resource management; Architectural engineering; Environmental science; Mechanical engineering","score_opus":0.012606721005233653,"score_gpt":0.27373037629695596,"score_spread":0.2611236552917223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171776","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99861765,0.000035819394,0.00035109388,0.000044996235,0.0000011788636,0.000015336833,0.000015544634,0.000002300754,0.0009160028],"genre_scores_gemma":[0.9993444,0.000056221103,0.00029722927,0.000006336133,0.0000018694045,0.000019369567,0.000015440719,0.0000010036268,0.0002580337],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987213,0.0006810924,0.00007875844,0.00006386404,0.00029326123,0.00016163636],"domain_scores_gemma":[0.9967518,0.00130237,0.00080866413,0.00011656952,0.00045752228,0.0005630777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024848331,0.0002576775,0.00013662326,0.001052885,0.0005253149,0.001098424,0.00020011247,0.00023191207,0.001461007],"category_scores_gemma":[0.005105536,0.00018992573,0.0002807557,0.0006254102,0.00043452362,0.0007298997,0.0014319535,0.00037060963,0.00017456847],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014583666,0.00096542377,0.9322623,0.00006218609,0.000054317465,0.00022469756,0.0055983355,0.0019224918,0.0010236197,0.0002840194,0.00026123307,0.05719557],"study_design_scores_gemma":[0.000007804066,0.0010495146,0.9857108,0.00004803049,0.000026647036,0.00016753978,0.007724162,0.003544704,0.0005159004,0.00019887363,0.0009899632,0.000016039376],"about_ca_topic_score_codex":0.0014635469,"about_ca_topic_score_gemma":0.0024458321,"teacher_disagreement_score":0.0024848331,"about_ca_system_score_codex":0.0004033279,"about_ca_system_score_gemma":0.0009075743,"threshold_uncertainty_score":0.013141155},"labels":[],"label_agreement":null},{"id":"W4408171778","doi":"10.5267/j.jpm.2025.2.007","title":"Leveraging activity-based costing and information technology strategic enhancements in decision-making, and competitive advantage in industrial projects","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Information Technology Governance and Strategy","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Competitive advantage; Activity-based costing; Business; Process management; Knowledge management; Manufacturing engineering; Engineering management; Computer science; Operations management; Engineering; Marketing","score_opus":0.018205434000865574,"score_gpt":0.27234053638067535,"score_spread":0.2541351023798098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171778","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957913,0.000054511172,0.00090458116,0.00006921062,0.0000023767668,0.00003749672,0.000005393437,0.0000033253361,0.0031317603],"genre_scores_gemma":[0.9986613,0.00004562081,0.0010658237,0.000008234657,0.0000015741573,0.000012992238,0.000005497693,6.0411526e-7,0.0001982899],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9951073,0.0033129347,0.00013137143,0.00016318267,0.0008084553,0.00047685078],"domain_scores_gemma":[0.99147487,0.004126205,0.0020912006,0.00035359012,0.00097117136,0.0009829248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037189214,0.00039147356,0.00021568233,0.0012514067,0.0010923757,0.00226575,0.0003362869,0.0003160073,0.0010120508],"category_scores_gemma":[0.00946399,0.00016171085,0.00021070559,0.00095414656,0.0007874461,0.0011461601,0.001458932,0.00044210025,0.00009210581],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005009274,0.003458051,0.6567181,0.00024493382,0.00017883973,0.0005939766,0.0075795166,0.009054579,0.008481814,0.011682956,0.00043339372,0.30107293],"study_design_scores_gemma":[0.000047358044,0.0014694062,0.9531611,0.00011105144,0.000095376556,0.00022006205,0.01545454,0.014796822,0.0030598312,0.0055598873,0.0059636366,0.000060953393],"about_ca_topic_score_codex":0.0034199045,"about_ca_topic_score_gemma":0.008649307,"teacher_disagreement_score":0.0037189214,"about_ca_system_score_codex":0.0018434399,"about_ca_system_score_gemma":0.00242839,"threshold_uncertainty_score":0.019667804},"labels":[],"label_agreement":null},{"id":"W4408171832","doi":"10.5267/j.jpm.2025.1.008","title":"Mediating influence of total quality management between just-in-time techniques and projects performance evaluatio","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Quality and Management Systems","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Total quality management; Quality (philosophy); Time management; Business; Computer science; Operations management; Engineering; Operating system; Physics","score_opus":0.037794728501120686,"score_gpt":0.3285636996024582,"score_spread":0.2907689711013375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171832","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9930733,0.0002962759,0.00067025464,0.00037225912,0.000022327858,0.00005488168,0.00004120413,0.000011962371,0.005457531],"genre_scores_gemma":[0.99870706,0.0001462589,0.00048987585,0.000027710033,0.0000089216965,0.00002026424,0.00001667724,0.0000040297778,0.0005792159],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99136144,0.005147222,0.0003342644,0.00073207536,0.0014512204,0.00097385823],"domain_scores_gemma":[0.9537451,0.03002062,0.007682494,0.0017592785,0.0027198922,0.0040725223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004280108,0.0005490308,0.00048013494,0.0010344889,0.0010494066,0.0027279505,0.0005097684,0.0005436862,0.006113662],"category_scores_gemma":[0.023741426,0.00031355215,0.0007699431,0.00076656265,0.0016103812,0.0009159209,0.0021520075,0.0010108665,0.000247079],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042257665,0.0013093281,0.9458836,0.00024740925,0.00048912666,0.00066999113,0.007033893,0.0007967921,0.0020198917,0.0043529356,0.00038615768,0.03638832],"study_design_scores_gemma":[0.0000258534,0.0006524967,0.9868832,0.00013758788,0.00023443332,0.00020314436,0.0071525103,0.0014793882,0.00065560336,0.0011382779,0.0014056833,0.00003189155],"about_ca_topic_score_codex":0.008841942,"about_ca_topic_score_gemma":0.008430925,"teacher_disagreement_score":0.008841942,"about_ca_system_score_codex":0.0015603906,"about_ca_system_score_gemma":0.004556077,"threshold_uncertainty_score":0.022635639},"labels":[],"label_agreement":null},{"id":"W4408171861","doi":"10.5267/j.jpm.2025.2.003","title":"Exploring gender differences in sustainable project management competencies and awareness of the sustainable development goals (SDGs)","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Socioeconomic Development in MENA","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Sustainable development; Process management; Business; Environmental resource management; Knowledge management; Psychology; Political science; Computer science; Economics","score_opus":0.09847733515694465,"score_gpt":0.3209820995366285,"score_spread":0.22250476437968383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408171861","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9971169,0.0001636336,0.0001749135,0.00013425044,0.000011627624,0.000009251644,0.000038448212,0.0000011206266,0.0023499068],"genre_scores_gemma":[0.9987243,0.00012050992,0.00012929724,0.000049201673,0.0000032927246,0.000012777012,0.000022405073,9.1592057e-7,0.0009373527],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994574,0.00013399238,0.00003699805,0.00006652768,0.00015044953,0.00015454274],"domain_scores_gemma":[0.99797696,0.0007519332,0.0005268453,0.000062996856,0.00031466,0.00036668914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014039362,0.00018525613,0.00022761863,0.00061712833,0.0005871713,0.00077252235,0.0001919663,0.00024061787,0.005239202],"category_scores_gemma":[0.0036870716,0.00013180145,0.00019571351,0.0003471364,0.00054140826,0.0007596583,0.00091092923,0.00038313412,0.00039653564],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019170254,0.0006141901,0.89684993,0.0001433047,0.000031970416,0.0004409358,0.033001367,0.00009187197,0.002153267,0.0018930886,0.0007807445,0.063807614],"study_design_scores_gemma":[0.000007580338,0.00056359917,0.94900894,0.00013162897,0.000021691134,0.0004272106,0.043370586,0.0002409193,0.0007117681,0.001009512,0.0044902964,0.00001633898],"about_ca_topic_score_codex":0.0018344326,"about_ca_topic_score_gemma":0.0039481698,"teacher_disagreement_score":0.005239202,"about_ca_system_score_codex":0.0002872772,"about_ca_system_score_gemma":0.00079515914,"threshold_uncertainty_score":0.017526805},"labels":[],"label_agreement":null},{"id":"W4408172006","doi":"10.5267/j.jpm.2025.2.001","title":"Project risk assessment: A holistic risk identification, analysis and evaluation approach, The case of EPC projects","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Identification (biology); Risk assessment; Risk analysis (engineering); Project risk management; Engineering; Computer science; Business; Systems engineering; Project management; Project management triangle; Computer security","score_opus":0.10877210307401605,"score_gpt":0.44846187805342624,"score_spread":0.3396897749794102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408172006","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.099220425,0.0031693748,0.8208419,0.005825538,0.00012674778,0.00085178966,0.00020541319,0.0001804749,0.06957832],"genre_scores_gemma":[0.6802019,0.0025552048,0.30894926,0.00022035278,0.000060684808,0.0005215363,0.000115732146,0.000047698144,0.007327669],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.98674715,0.008257902,0.00045380468,0.0005214364,0.0032854464,0.00073426747],"domain_scores_gemma":[0.99452597,0.0031045442,0.00061792653,0.00033271656,0.0010933155,0.00032553097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012500666,0.0014023681,0.0009698337,0.0052683335,0.0033774246,0.006597037,0.0019285822,0.0034581232,0.0025941804],"category_scores_gemma":[0.009745249,0.00066538516,0.0012819036,0.003907402,0.0029390168,0.00394223,0.005531811,0.002353757,0.00036992136],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018394871,0.00047587068,0.010563222,0.0012781254,0.00027153068,0.0077684014,0.012312719,0.3099001,0.005626612,0.37739965,0.009569258,0.2646506],"study_design_scores_gemma":[0.000059634825,0.00058591715,0.0106174555,0.0017726608,0.00024056293,0.006991893,0.03195077,0.5717562,0.004829435,0.2938427,0.07704091,0.00031189132],"about_ca_topic_score_codex":0.006491879,"about_ca_topic_score_gemma":0.007823662,"teacher_disagreement_score":0.012500666,"about_ca_system_score_codex":0.004154048,"about_ca_system_score_gemma":0.0061373417,"threshold_uncertainty_score":0.06611061},"labels":[],"label_agreement":null},{"id":"W4408172715","doi":"10.5267/j.jpm.2025.2.002","title":"How internal factors determine digital transformation: The moderating role of leader's project management competence","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Information Technology Governance and Strategy","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Competence (human resources); Business; Knowledge management; Process management; Digital transformation; Psychology; Computer science; Social psychology; World Wide Web","score_opus":0.01514756801441697,"score_gpt":0.23067337395086354,"score_spread":0.21552580593644657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408172715","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99149317,0.00005839313,0.0009414921,0.0003801582,0.000011119024,0.000057415946,0.000028773356,0.000008314837,0.00702119],"genre_scores_gemma":[0.99908984,0.000035720936,0.00025504595,0.000024596806,0.0000024218828,0.000020546855,0.000017063629,0.000002431072,0.0005523881],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99554104,0.002562827,0.00016285153,0.00035239258,0.0005737143,0.0008072633],"domain_scores_gemma":[0.9745943,0.015085973,0.003121446,0.00091100694,0.0020467155,0.0042404886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004146529,0.00032991046,0.00023930987,0.000630683,0.0010799711,0.002195932,0.0003631543,0.0004074661,0.0054021557],"category_scores_gemma":[0.016246056,0.00021174621,0.00028784474,0.00048695187,0.0013254978,0.0011524716,0.0024528997,0.0009288308,0.00034794337],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002367949,0.0013900914,0.9014316,0.0001802819,0.00015505016,0.0005398406,0.03383987,0.00076989224,0.002086976,0.0048621995,0.0008841424,0.05362318],"study_design_scores_gemma":[0.000049208906,0.00044093188,0.9521665,0.00020084537,0.000102743434,0.00013784195,0.03606914,0.0030792092,0.0016513256,0.0020147194,0.0040600216,0.000027428954],"about_ca_topic_score_codex":0.005365983,"about_ca_topic_score_gemma":0.0068700253,"teacher_disagreement_score":0.0054021557,"about_ca_system_score_codex":0.0011387619,"about_ca_system_score_gemma":0.0047863843,"threshold_uncertainty_score":0.021929204},"labels":[],"label_agreement":null},{"id":"W4408235367","doi":"10.5267/j.jpm.2024.12.004","title":"Management project performance in Indonesia’s food estate development: A stakeholder, institutional, and communication perspectiv","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Consumer Retail Behavior Studies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Padjadjaran; Lembaga Pengelola Dana Pendidikan","keywords":"Business; Estate; Stakeholder; Real estate development; Environmental planning; Process management; Environmental resource management; Real estate; Public relations; Finance; Political science; Geography; Economics","score_opus":0.05390085309590494,"score_gpt":0.27481788247733546,"score_spread":0.2209170293814305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408235367","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9898873,0.000058390975,0.0004887823,0.0002697524,0.0000045741494,0.000019516438,0.0000141786595,0.000006125017,0.009251376],"genre_scores_gemma":[0.9990177,0.000047274883,0.0002644944,0.000010206501,0.0000016722178,0.000008343717,0.000008417631,0.0000017519078,0.00064010755],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99658513,0.001833197,0.0001978073,0.0001593243,0.00072982145,0.00049469585],"domain_scores_gemma":[0.994905,0.0013771919,0.0017567562,0.00019232272,0.000682285,0.0010864737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032099292,0.00021906014,0.00017397209,0.000674355,0.0015164649,0.0031250906,0.0004003398,0.00032685586,0.0019529734],"category_scores_gemma":[0.0060608643,0.0001465426,0.00010611928,0.0010791416,0.0011352937,0.0011983908,0.002355446,0.00056530884,0.00025527814],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024352892,0.000832596,0.7746479,0.00032717222,0.00005693056,0.0027356823,0.050842755,0.00435654,0.0049691796,0.0082137855,0.0024663045,0.15030758],"study_design_scores_gemma":[0.000011730191,0.0005037496,0.8107391,0.00016844188,0.000026800964,0.0006615986,0.16463326,0.00614217,0.002440413,0.0017784765,0.012850615,0.000043645083],"about_ca_topic_score_codex":0.0028954619,"about_ca_topic_score_gemma":0.005835215,"teacher_disagreement_score":0.0032099292,"about_ca_system_score_codex":0.0021462415,"about_ca_system_score_gemma":0.0029035998,"threshold_uncertainty_score":0.01697594},"labels":[],"label_agreement":null},{"id":"W4408236993","doi":"10.5267/j.jpm.2024.12.003","title":"Innovative strategy: Utilizing social capital to develop green products","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Global Healthcare and Medical Tourism","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Social capital; Business; Industrial organization; Capital (architecture); Environmental economics; Economics; Sociology; Geography; Social science","score_opus":0.1113481835874678,"score_gpt":0.4821708155368915,"score_spread":0.3708226319494237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408236993","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44027022,0.0015911065,0.023171753,0.0099578,0.00038415336,0.00094787986,0.000097653676,0.00022593747,0.5233535],"genre_scores_gemma":[0.9448547,0.001019931,0.01877427,0.0007324766,0.000052240666,0.00015586872,0.0000520644,0.00003228051,0.034326144],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99919814,0.00037035946,0.000018970353,0.000080361955,0.0001655363,0.00016660153],"domain_scores_gemma":[0.9993242,0.00013045903,0.00008873393,0.00008103708,0.00010207107,0.00027343782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014532509,0.0004657586,0.00013280769,0.0012003301,0.0020479984,0.0051543806,0.0007078683,0.0007121243,0.007537635],"category_scores_gemma":[0.0009931187,0.000115768235,0.00039595604,0.00074295094,0.0019961246,0.0027490635,0.0046412027,0.0005495499,0.0012005795],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001401286,0.0017220175,0.022944884,0.0012167045,0.00010503528,0.001657286,0.029599248,0.0010557956,0.00843497,0.19011572,0.022181643,0.7208266],"study_design_scores_gemma":[0.00010960035,0.0017575416,0.040925283,0.0013367307,0.00012743675,0.0013532101,0.07401201,0.0046198224,0.008778813,0.08036814,0.7865129,0.00009851693],"about_ca_topic_score_codex":0.0009793544,"about_ca_topic_score_gemma":0.003248311,"teacher_disagreement_score":0.007537635,"about_ca_system_score_codex":0.0014098496,"about_ca_system_score_gemma":0.0032650367,"threshold_uncertainty_score":0.025215924},"labels":[],"label_agreement":null},{"id":"W4408237996","doi":"10.5267/j.jpm.2025.3.002","title":"Exploring the bridge between digital transformation and sustainable supply chain performance: An empirical study based on Yunnan fresh cut flower supply chain","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Supply chain; Bridge (graph theory); Transformation (genetics); Business; Chain (unit); Environmental economics; Industrial organization; Economics; Marketing; Chemistry; Medicine","score_opus":0.04270600774235253,"score_gpt":0.28147822809043394,"score_spread":0.2387722203480814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408237996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99919647,0.000030786232,0.00014518324,0.000029073555,5.7153835e-7,0.000020937341,0.000017387936,6.7596943e-7,0.00055888237],"genre_scores_gemma":[0.9990238,0.00014589468,0.000348201,0.000017659326,0.0000014061255,0.000029091381,0.00006573091,8.065187e-7,0.00036737064],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99952817,0.0001446557,0.000042343992,0.00006564611,0.00009051883,0.00012873714],"domain_scores_gemma":[0.99758196,0.0013299885,0.00045057014,0.000083979656,0.0003288134,0.00022461521],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013387671,0.00029390363,0.00024276784,0.0013211571,0.001550176,0.0013392065,0.00039619752,0.00038591475,0.0021744634],"category_scores_gemma":[0.0025371583,0.0002036455,0.00030315833,0.0027356292,0.0007415578,0.0015243001,0.0010212224,0.00060021365,0.00016459488],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008576093,0.0009292253,0.9143486,0.00024534378,0.000045257788,0.002644335,0.049712423,0.0016514385,0.002052383,0.001836567,0.0002719435,0.02617675],"study_design_scores_gemma":[0.000021576096,0.0006176564,0.70962757,0.00024142925,0.00008202889,0.0003975332,0.2769129,0.006501266,0.0015014455,0.0007382273,0.0033252637,0.000033135082],"about_ca_topic_score_codex":0.02692963,"about_ca_topic_score_gemma":0.039589994,"teacher_disagreement_score":0.02692963,"about_ca_system_score_codex":0.0022993784,"about_ca_system_score_gemma":0.003462061,"threshold_uncertainty_score":0.053545713},"labels":[],"label_agreement":null},{"id":"W4410870850","doi":"10.5267/j.jpm.2025.3.003","title":"Analysis of policy regulations and market access as drivers of collaboration in enhancing sustainable competitiveness in the project creative industry","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Cultural Industries and Urban Development","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Industrial organization; Market access; Marketing","score_opus":0.02339562081833731,"score_gpt":0.3867153182712359,"score_spread":0.3633196974528986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410870850","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9767612,0.00015271603,0.0020057522,0.0012370937,0.000014571939,0.00011391213,0.000083586645,0.000011429511,0.019619798],"genre_scores_gemma":[0.9983192,0.00010664432,0.0005869884,0.00006393563,0.0000044511094,0.00005816017,0.000047014004,0.0000030136705,0.00081066607],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9946635,0.0027978735,0.00029500734,0.00044356607,0.00088755816,0.00091249717],"domain_scores_gemma":[0.984925,0.008534128,0.003961364,0.00040054705,0.0009973111,0.0011816894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0051071034,0.00027582952,0.0003528629,0.0016672711,0.0015131199,0.0041147373,0.0008398016,0.0009672283,0.0063574705],"category_scores_gemma":[0.010888406,0.00023720835,0.00077022053,0.0016405516,0.0014198046,0.0020636418,0.0027638227,0.0010981314,0.00033339986],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013014037,0.0014584429,0.91172564,0.00025827304,0.00019701854,0.00070243934,0.011416618,0.0052913516,0.00044691726,0.041054733,0.001054402,0.026264094],"study_design_scores_gemma":[0.00009039212,0.0005478563,0.84549576,0.00068834116,0.00039411755,0.00025507345,0.08158561,0.037554886,0.0011874563,0.017256709,0.014867524,0.00007622233],"about_ca_topic_score_codex":0.008843349,"about_ca_topic_score_gemma":0.008640077,"teacher_disagreement_score":0.008843349,"about_ca_system_score_codex":0.0036779495,"about_ca_system_score_gemma":0.009154835,"threshold_uncertainty_score":0.027009249},"labels":[],"label_agreement":null},{"id":"W4410870912","doi":"10.5267/j.jpm.2025.5.002","title":"Exploring the application of artificial intelligence in project management: A systematic literature review","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Big Data and Business Intelligence","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Systematic review; Management science; Computer science; Engineering; Political science; MEDLINE","score_opus":0.11519138931004605,"score_gpt":0.34048302510479883,"score_spread":0.22529163579475278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410870912","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0054336274,0.9869299,0.0016844796,0.001393769,0.00019489488,0.0021324768,0.00083158753,0.000019121633,0.0013802559],"genre_scores_gemma":[0.029846173,0.960671,0.004956122,0.0007608717,0.00008183909,0.0030435533,0.00045737688,0.000010560533,0.00017254894],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.98152244,0.0070883096,0.0065581757,0.0009047378,0.0035358332,0.00039048106],"domain_scores_gemma":[0.90773267,0.07063444,0.010360064,0.0014283204,0.009002491,0.00084212737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022793746,0.0010565071,0.004375345,0.036389645,0.0014853489,0.004169799,0.0018258247,0.0019519802,0.003048287],"category_scores_gemma":[0.08231282,0.0011826915,0.0040261727,0.030822352,0.0017267098,0.0050502517,0.0030892072,0.001369495,0.00036691662],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007773283,0.000053955704,0.0023968907,0.8830608,0.0022650473,0.00034335165,0.0020268417,0.00024324373,0.00025433055,0.0014207488,0.002145553,0.10571134],"study_design_scores_gemma":[0.000037528003,0.00010433815,0.0032630325,0.96400726,0.006735434,0.00040560905,0.0020057373,0.00013014163,0.00014628744,0.00062910607,0.022500549,0.00003503002],"about_ca_topic_score_codex":0.008921593,"about_ca_topic_score_gemma":0.030817777,"teacher_disagreement_score":0.036389645,"about_ca_system_score_codex":0.0055603483,"about_ca_system_score_gemma":0.039083306,"threshold_uncertainty_score":0.12054628},"labels":[],"label_agreement":null},{"id":"W4410870975","doi":"10.5267/j.jpm.2025.3.006","title":"Investigating the influence of sustainable and smart supply chain practices on the entrepreneurial ecosystem of startup projects","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Economic and Technological Innovation","field":"Economics, Econometrics and Finance","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Supply chain; Ecosystem; Environmental resource management; Entrepreneurship; Industrial organization; Process management; Marketing; Economics; Ecology; Finance","score_opus":0.03907035446383067,"score_gpt":0.25145571269610756,"score_spread":0.2123853582322769,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410870975","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99794465,0.000059041395,0.00008483874,0.000092403454,0.0000021638725,0.000013644218,0.0000070453857,0.0000011798783,0.001794996],"genre_scores_gemma":[0.9993057,0.00013906755,0.0001357932,0.000016640866,0.0000019900472,0.00001133451,0.000011000461,8.9750915e-7,0.00037752636],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99688953,0.0018130135,0.000117900076,0.00016444172,0.00047775632,0.00053739565],"domain_scores_gemma":[0.97623515,0.010453645,0.005939613,0.00048191802,0.0019765836,0.0049131643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042616045,0.00019601734,0.00023605228,0.0014394075,0.0015297077,0.0030815643,0.00033695844,0.00042230796,0.0016930116],"category_scores_gemma":[0.012911925,0.00020890162,0.00027857066,0.001060751,0.0011204984,0.0013994856,0.0026829306,0.0008234376,0.00018422144],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015549305,0.0007768116,0.93037605,0.000109190805,0.00008644692,0.00085367943,0.03433537,0.00030407877,0.00069879746,0.0013514695,0.00034100038,0.030611595],"study_design_scores_gemma":[0.00000695246,0.00039024212,0.9074333,0.00012292646,0.000051718773,0.00015193137,0.08810452,0.0005888711,0.00033003767,0.00040389097,0.0023944585,0.000021272721],"about_ca_topic_score_codex":0.002857349,"about_ca_topic_score_gemma":0.007913851,"teacher_disagreement_score":0.0042616045,"about_ca_system_score_codex":0.0015147718,"about_ca_system_score_gemma":0.0023557832,"threshold_uncertainty_score":0.022537768},"labels":[],"label_agreement":null},{"id":"W4410871018","doi":"10.5267/j.jpm.2025.4.001","title":"Consolidating sustainability efforts: The role of effective supply chain management in balancing economic growth, environmental stewardship, and social responsibility","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Innovation and Socioeconomic Development","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Stewardship (theology); Sustainability; Environmental stewardship; Business; Social sustainability; Social responsibility; Supply chain; Corporate social responsibility; Environmental resource management; Environmental ethics; Environmental planning; Economics; Public relations; Political science; Marketing; Ecology; Geography; Politics","score_opus":0.003806718354029797,"score_gpt":0.23047641163219035,"score_spread":0.22666969327816056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871018","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74931896,0.0043294067,0.040352512,0.026711278,0.00020194982,0.0002771397,0.00004362347,0.00016126367,0.17860378],"genre_scores_gemma":[0.99181914,0.0009644922,0.004978039,0.00029137894,0.000025080195,0.000023297991,0.000010127692,0.000009693069,0.0018786868],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9954776,0.0025864746,0.00017495599,0.00026449785,0.00081783853,0.0006786867],"domain_scores_gemma":[0.9904557,0.0031582392,0.0020302788,0.0005758439,0.0019638767,0.0018160924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007709617,0.00047251946,0.00020211768,0.0018338443,0.003212089,0.009062708,0.00070133345,0.0011075948,0.0024629368],"category_scores_gemma":[0.008398308,0.00023239128,0.00022878354,0.0015100043,0.004035806,0.0066433717,0.006122828,0.0011623772,0.0003496177],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015021206,0.0008392959,0.11215054,0.0013132434,0.0002212156,0.0008751642,0.04284444,0.009041194,0.0077393707,0.24701996,0.0054903203,0.572315],"study_design_scores_gemma":[0.00008450269,0.0011202653,0.122416675,0.003819944,0.00030892438,0.00073319074,0.1641253,0.018575547,0.012648972,0.40222222,0.27374253,0.00020197559],"about_ca_topic_score_codex":0.004622652,"about_ca_topic_score_gemma":0.007394865,"teacher_disagreement_score":0.009062708,"about_ca_system_score_codex":0.0036589543,"about_ca_system_score_gemma":0.013161871,"threshold_uncertainty_score":0.040772855},"labels":[],"label_agreement":null},{"id":"W4410871205","doi":"10.5267/j.jpm.2025.4.003","title":"You are entitled to access the full text of this documentEnhancing sustainable performance through circular economy: The mediating roles of green supply chain and process innovation ,","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Sustainable Supply Chain Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Supply chain; Business; Circular economy; Process (computing); Industrial organization; Innovation process; Process management; Marketing; Computer science; Work in process; Biology","score_opus":0.01039040174249119,"score_gpt":0.26149268746771226,"score_spread":0.2511022857252211,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871205","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039643224,0.03975021,0.023143778,0.19271427,0.059752177,0.00081163924,0.01079814,0.0034544922,0.62993205],"genre_scores_gemma":[0.106490105,0.049795646,0.023972824,0.021380402,0.008375241,0.0005047702,0.0050006653,0.002098022,0.78238237],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911565,0.00018396656,0.00008357545,0.000084385305,0.00043106437,0.00010139118],"domain_scores_gemma":[0.98863375,0.0044470597,0.0013374891,0.0011230739,0.003677883,0.00078064617],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0019321605,0.00047535152,0.00057172775,0.0021856928,0.0018485298,0.009790211,0.00072838075,0.0026082527,0.28389055],"category_scores_gemma":[0.023564061,0.00029383443,0.000651285,0.0025021073,0.0013496522,0.008417418,0.0031763902,0.0022575562,0.12173982],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013576869,0.0002794247,0.0024951056,0.0017578356,0.000051218904,0.00070881855,0.0017188084,0.00035447927,0.0047228937,0.027402744,0.6551686,0.30520433],"study_design_scores_gemma":[0.000013638564,0.000048088852,0.0017057257,0.0006770287,0.000020309271,0.00031011965,0.0013322202,0.00032763692,0.0017116163,0.005866738,0.98795474,0.00003213769],"about_ca_topic_score_codex":0.0030203345,"about_ca_topic_score_gemma":0.0045243944,"teacher_disagreement_score":0.71610945,"about_ca_system_score_codex":0.0012790334,"about_ca_system_score_gemma":0.003139733,"threshold_uncertainty_score":0.94970846},"labels":[],"label_agreement":null},{"id":"W4410871246","doi":"10.5267/j.jpm.2025.3.007","title":"The impact of artificial intelligence capabilities on the sustainability with the mediating role of green innovation in the Jordanian hotels sector","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Organizational and Employee Performance","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Business; Green innovation; Industrial organization; Knowledge management; Computer science; Ecology","score_opus":0.015875922739713774,"score_gpt":0.2812086533395112,"score_spread":0.26533273059979745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871246","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98239696,0.00047820446,0.00033436657,0.00079902273,0.000012910092,0.000029903402,0.000038834518,0.0000054544107,0.015904352],"genre_scores_gemma":[0.9982414,0.00042395585,0.0002777243,0.00006007258,0.0000054594634,0.000011179296,0.000020510248,0.000001394186,0.0009582508],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998904,0.00047838996,0.0000490442,0.000091118956,0.00018150329,0.00029600578],"domain_scores_gemma":[0.9970048,0.001071065,0.00064041506,0.00011020038,0.0005832241,0.0005903075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012111973,0.00045203054,0.00022737916,0.0010415423,0.0010321563,0.00335204,0.00038373726,0.0005131121,0.0047838003],"category_scores_gemma":[0.0025743993,0.00017128419,0.0006004608,0.00085460616,0.0010261846,0.001513473,0.0028192422,0.00073235855,0.0003161067],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023720223,0.0014777428,0.8448541,0.00089914683,0.00037924477,0.0029517603,0.018369013,0.0034732244,0.0029262684,0.022792896,0.0021156608,0.099523686],"study_design_scores_gemma":[0.000039910723,0.00055895356,0.8831618,0.0009459471,0.00044606143,0.00062867434,0.07482939,0.007812106,0.0032640435,0.00974996,0.018494932,0.000068203146],"about_ca_topic_score_codex":0.0068483525,"about_ca_topic_score_gemma":0.01090992,"teacher_disagreement_score":0.0068483525,"about_ca_system_score_codex":0.0017286077,"about_ca_system_score_gemma":0.0048938813,"threshold_uncertainty_score":0.01600343},"labels":[],"label_agreement":null},{"id":"W4410871264","doi":"10.5267/j.jpm.2025.4.005","title":"The impact of configuration management decisions on firm resilience: Integrating resource configuration, operational flexibility, and collaborative supply chain strategies","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Supply Chain Resilience and Risk Management","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Direktorat Jenderal Pendidikan Tinggi; Universitas Kristen Petra","keywords":"Flexibility (engineering); Resilience (materials science); Supply chain; Process management; Business; Resource (disambiguation); Supply chain management; Supply chain risk management; Operations management; Risk analysis (engineering); Computer science; Service management; Engineering; Economics; Marketing; Management","score_opus":0.01564063756002548,"score_gpt":0.317876430731176,"score_spread":0.3022357931711505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871264","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9949999,0.000054948367,0.0006544703,0.00017963073,0.0000035194178,0.000017219216,0.000012654539,0.0000051302054,0.004072533],"genre_scores_gemma":[0.999793,0.000015032654,0.00010331433,0.000007694604,8.9172653e-7,0.000002440386,0.000004409866,6.847179e-7,0.000072638104],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99668664,0.001759643,0.0001703063,0.00023778106,0.0004868093,0.0006588898],"domain_scores_gemma":[0.98439217,0.008063119,0.0043770745,0.0005833386,0.00086640415,0.0017179213],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026008177,0.00034608084,0.00019674988,0.0011957398,0.0010086519,0.0029563534,0.0004146739,0.0005078645,0.002296122],"category_scores_gemma":[0.01285623,0.00018976175,0.00033222747,0.0010679582,0.0014573517,0.0018892671,0.002262303,0.0007777847,0.00013454787],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000416186,0.0005527768,0.9082086,0.000087057146,0.0003230031,0.0014979383,0.0056550843,0.018427713,0.0024449553,0.006084745,0.00042737977,0.055874623],"study_design_scores_gemma":[0.000020712137,0.00051861303,0.95491266,0.00011033087,0.00014490692,0.00033322728,0.018442929,0.017902523,0.0013503109,0.0045733997,0.0016166908,0.00007378633],"about_ca_topic_score_codex":0.004552188,"about_ca_topic_score_gemma":0.0074289427,"teacher_disagreement_score":0.004552188,"about_ca_system_score_codex":0.002330056,"about_ca_system_score_gemma":0.0021896388,"threshold_uncertainty_score":0.016905785},"labels":[],"label_agreement":null},{"id":"W4410871270","doi":"10.5267/j.jpm.2025.4.002","title":"You are entitled to access the full text of this documentAntecedents of intention to use project management among educational institution: Empirical study in Jordan","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Institution; Psychology; Empirical research; Knowledge management; Medical education; Public relations; Sociology; Business; Political science; Computer science; Medicine; Social science; Epistemology; Philosophy","score_opus":0.11340151513184703,"score_gpt":0.45618771603993175,"score_spread":0.3427862009080847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871270","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972126,0.00009604815,0.00018839279,0.00026098435,0.000004141928,0.000027576001,0.000043976142,0.0000028154436,0.00216348],"genre_scores_gemma":[0.99609995,0.00032807386,0.0003284912,0.00019790171,0.000009476841,0.00005514237,0.000060531504,0.000005812623,0.0029145414],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986268,0.0005552896,0.00011998122,0.00009952419,0.0003546711,0.00024369099],"domain_scores_gemma":[0.9903128,0.0037453987,0.0020741122,0.0004360381,0.0022694536,0.0011622118],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0027470225,0.00012519644,0.0002450964,0.0007991018,0.00096881186,0.0019458242,0.000395641,0.00047398914,0.0066800215],"category_scores_gemma":[0.010708772,0.00021461747,0.00024466723,0.0010216468,0.0006750752,0.0015402605,0.0009848436,0.0009446627,0.0011980365],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015227405,0.0023866,0.8962555,0.00017006996,0.00002315919,0.00043902884,0.03239386,0.00013300973,0.00083616737,0.0008305137,0.0020746996,0.064305216],"study_design_scores_gemma":[0.000019087001,0.0008859417,0.8836286,0.00026417885,0.000038164995,0.000515497,0.100405574,0.0010785735,0.000792543,0.0005244652,0.011806435,0.000040939085],"about_ca_topic_score_codex":0.004093064,"about_ca_topic_score_gemma":0.005068095,"teacher_disagreement_score":0.99332,"about_ca_system_score_codex":0.00070149323,"about_ca_system_score_gemma":0.0018531035,"threshold_uncertainty_score":0.022346854},"labels":[],"label_agreement":null},{"id":"W4410871355","doi":"10.5267/j.jpm.2025.5.003","title":"The impact of technological innovation on project management performance: The mediating roles of sustainability culture and top management support","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Technology Adoption and User Behaviour","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Innovation management; Business; Knowledge management; Organizational culture; Process management; Management; Marketing; Computer science; Ecology; Economics","score_opus":0.04427855639342027,"score_gpt":0.4149398252909962,"score_spread":0.37066126889757595,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871355","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99683267,0.000100150915,0.00026165362,0.00014637726,0.000003935055,0.000008249946,0.0000079010215,0.000002304296,0.0026368634],"genre_scores_gemma":[0.99959725,0.00007045899,0.00014494757,0.000014856974,0.000002835014,0.0000040244627,0.000004870915,5.418552e-7,0.00016022506],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99645716,0.002003597,0.00017891754,0.00016534691,0.000660497,0.0005345676],"domain_scores_gemma":[0.9745992,0.013370553,0.0054889624,0.00075877714,0.0024290502,0.0033534993],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032725579,0.00028621976,0.00022425767,0.00075800193,0.00071536814,0.002254007,0.00031288477,0.00039177877,0.0019366634],"category_scores_gemma":[0.014161551,0.00012172515,0.00026849896,0.000519782,0.00066457427,0.00078571984,0.0017198618,0.00059663295,0.00021266013],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020941977,0.0011153625,0.8803061,0.00024620182,0.00022131605,0.0004977788,0.011399907,0.0009321158,0.0029943704,0.0017093444,0.0003466016,0.10002137],"study_design_scores_gemma":[0.000016195207,0.00066215824,0.9741743,0.00016789605,0.000106203835,0.00019915366,0.018272378,0.0020593198,0.001415509,0.00074939645,0.0021538667,0.000023636698],"about_ca_topic_score_codex":0.0025996554,"about_ca_topic_score_gemma":0.003340136,"teacher_disagreement_score":0.0032725579,"about_ca_system_score_codex":0.00077466725,"about_ca_system_score_gemma":0.002352512,"threshold_uncertainty_score":0.017307162},"labels":[],"label_agreement":null},{"id":"W4410871398","doi":"10.5267/j.jpm.2025.3.005","title":"The role of artificial intelligence in project management performance: The mediating effects of competence retention and top management support","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Technology and Data Analysis","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Competence (human resources); Psychology; Knowledge management; Applied psychology; Process management; Business; Computer science; Social psychology","score_opus":0.007826316417421864,"score_gpt":0.26060021262076816,"score_spread":0.2527738962033463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871398","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9890126,0.00017614095,0.0009572029,0.0005969738,0.0000104941555,0.000028938288,0.00001832204,0.000008595552,0.009190699],"genre_scores_gemma":[0.99922884,0.00008069651,0.00036243926,0.000037820322,0.00000627269,0.000010745393,0.000009526611,0.0000013916232,0.00026218157],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99346524,0.0039174617,0.000302149,0.00030890657,0.0011132772,0.00089300645],"domain_scores_gemma":[0.94220334,0.03378271,0.0111918645,0.0019209507,0.004045932,0.0068551973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005983571,0.00040146703,0.0003254619,0.0009956692,0.0011381361,0.0031812221,0.000569534,0.00048748477,0.0028237673],"category_scores_gemma":[0.029307185,0.0001664949,0.0002884744,0.000910944,0.0012191202,0.0012122933,0.0026116439,0.0010523951,0.00029460917],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043730534,0.003253711,0.7961652,0.00040860544,0.00042153016,0.0007070553,0.019073347,0.0023686753,0.0028542443,0.0068397904,0.00088190456,0.16658857],"study_design_scores_gemma":[0.000059049613,0.001229934,0.95984024,0.00037320715,0.0001923003,0.00027718113,0.02232319,0.005337706,0.0014776981,0.0049764276,0.003855091,0.00005806221],"about_ca_topic_score_codex":0.0035154182,"about_ca_topic_score_gemma":0.003130815,"teacher_disagreement_score":0.005983571,"about_ca_system_score_codex":0.001103959,"about_ca_system_score_gemma":0.0041842163,"threshold_uncertainty_score":0.031644583},"labels":[],"label_agreement":null},{"id":"W4410871890","doi":"10.5267/j.jpm.2025.3.004","title":"Green growth pathway through green innovation and human capital under low and high regime: From the perspective of energy intensity","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Energy, Environment, Economic Growth","field":"Economics, Econometrics and Finance","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Human capital; Green growth; Intensity (physics); Economics; Natural resource economics; Business; Economic growth; Physics; Sustainable development; Biology; Computer science; Ecology; Optics","score_opus":0.020964503837444057,"score_gpt":0.22135342812477998,"score_spread":0.20038892428733593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410871890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9846043,0.00041478293,0.0017626055,0.0009176658,0.000014011065,0.000017713182,0.00033158262,0.00001823034,0.011919268],"genre_scores_gemma":[0.99917597,0.00010734844,0.0001319083,0.000027854225,0.000005510366,0.0000051519637,0.0000831388,0.000001807516,0.00046133657],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995234,0.00009112809,0.00002156296,0.00009456205,0.00008032735,0.00018899761],"domain_scores_gemma":[0.9983271,0.00059677043,0.0005328347,0.00009510688,0.00021130187,0.00023703263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067326566,0.00020739528,0.00022461351,0.0008060041,0.00033465037,0.0016566592,0.0002369265,0.0004309022,0.003417555],"category_scores_gemma":[0.0020512822,0.00006429158,0.00049630675,0.0010149161,0.0008184072,0.0012824354,0.001210563,0.000599745,0.0002239696],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026669377,0.00020170884,0.9090379,0.00022147257,0.00025939403,0.0008909671,0.0014995941,0.014592662,0.0030819746,0.03690017,0.0015847678,0.031462744],"study_design_scores_gemma":[0.0000125721435,0.0001514112,0.96293974,0.00008794655,0.00013668313,0.00012160305,0.00416735,0.0116947135,0.001843212,0.013224135,0.0055908975,0.00002974718],"about_ca_topic_score_codex":0.0058795856,"about_ca_topic_score_gemma":0.0060901362,"teacher_disagreement_score":0.0058795856,"about_ca_system_score_codex":0.0011081146,"about_ca_system_score_gemma":0.0011472704,"threshold_uncertainty_score":0.011690736},"labels":[],"label_agreement":null},{"id":"W4410872135","doi":"10.5267/j.jpm.2025.4.004","title":"How do data, project management maturity, and PMO support shape resilient oil and gas projects?","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Reservoir Engineering and Simulation Methods","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Petroleum engineering; Business; Environmental resource management; Engineering; Process management; Environmental science; Political science","score_opus":0.029725550993676266,"score_gpt":0.30699619287874286,"score_spread":0.2772706418850666,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410872135","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9939758,0.00010913876,0.0018286797,0.0009400784,0.0000050885556,0.000024611845,0.0000847618,0.000008304561,0.003023591],"genre_scores_gemma":[0.9992747,0.000045741304,0.0004674075,0.00003106556,0.0000019724573,0.000012228225,0.000030763753,0.00000301829,0.00013309658],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9953101,0.0024480163,0.00026499308,0.00044951748,0.00079167495,0.0007357252],"domain_scores_gemma":[0.97310007,0.010701512,0.008989229,0.0014517597,0.0020826794,0.00367466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058511533,0.00021037074,0.0001880637,0.0012705935,0.0006824177,0.0032529598,0.00047598043,0.00056653406,0.0017206364],"category_scores_gemma":[0.033822805,0.00022743098,0.00022334758,0.0014468024,0.0015736021,0.0038867542,0.0035029924,0.0009769417,0.0003220356],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009323171,0.00018500186,0.9288881,0.000089037865,0.000058838203,0.00017967728,0.014545724,0.0010606094,0.00089804945,0.0050618434,0.0005744948,0.048365444],"study_design_scores_gemma":[0.0000068897757,0.00016986323,0.94886845,0.00012788319,0.000021071355,0.0001507098,0.037724085,0.0022063248,0.00053415063,0.004598961,0.0055618705,0.000029827183],"about_ca_topic_score_codex":0.0029738646,"about_ca_topic_score_gemma":0.005592287,"teacher_disagreement_score":0.0058511533,"about_ca_system_score_codex":0.0012257413,"about_ca_system_score_gemma":0.003078418,"threshold_uncertainty_score":0.030944228},"labels":[],"label_agreement":null},{"id":"W4410872146","doi":"10.5267/j.jpm.2025.5.001","title":"Optimizing stochastic multi-project scheduling with a simulation integrated multi-objective genetic algorithm","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Genetic algorithm; Scheduling (production processes); Mathematical optimization; Algorithm; Mathematics; Machine learning","score_opus":0.0832241558811624,"score_gpt":0.39705636607974154,"score_spread":0.31383221019857915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410872146","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06979109,0.00022867155,0.9245752,0.000194862,0.000031279327,0.00009184575,0.000051887804,0.0003104498,0.004724616],"genre_scores_gemma":[0.84043205,0.00026390402,0.15719134,0.000059578604,0.000012428426,0.00028618224,0.00012174732,0.000041558236,0.0015911746],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960524,0.00019666945,0.0000137586085,0.000039523587,0.000088128814,0.0000567056],"domain_scores_gemma":[0.9993162,0.0004522902,0.00007372093,0.000023908495,0.0001007957,0.000033110886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000891384,0.00062796025,0.0008410267,0.0006324632,0.00035965073,0.0007244401,0.00072237634,0.0009064996,0.0010435077],"category_scores_gemma":[0.0016168054,0.00046359905,0.00086066936,0.0006867589,0.0004390855,0.0004063809,0.00065950776,0.0006922329,0.00012115599],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000066936263,0.000007063106,0.00008981582,0.0000047820954,0.000005327014,0.000005956819,0.000004133439,0.99756694,0.00014049577,0.00049744255,0.000026669486,0.0016446656],"study_design_scores_gemma":[0.0000030774038,0.0000066902476,0.000019802654,0.0000010159849,0.0000015686932,0.0000012470339,0.0000014778772,0.99968266,0.000048584126,0.00018980846,0.00004338612,8.241746e-7],"about_ca_topic_score_codex":0.011990753,"about_ca_topic_score_gemma":0.006492368,"teacher_disagreement_score":0.011990753,"about_ca_system_score_codex":0.0009007865,"about_ca_system_score_gemma":0.0021676465,"threshold_uncertainty_score":0.023841918},"labels":[],"label_agreement":null},{"id":"W4413958431","doi":"10.5267/j.jpm.2025.6.006","title":"Driving construction project success through project manager knowledge","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Project manager; Project sponsorship; Project management; Business; Engineering management; Project management triangle; Knowledge management; Engineering; Process management; Project charter; Construction engineering; Computer science; Systems engineering","score_opus":0.07949613910668557,"score_gpt":0.42586929719771693,"score_spread":0.34637315809103136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958431","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99430287,0.00009034771,0.000667105,0.00014645663,0.0000028416575,0.0000137153775,0.00002049712,0.000005160522,0.004751091],"genre_scores_gemma":[0.9991579,0.000077281926,0.00027559124,0.00001016612,0.0000018379932,0.000007954794,0.000012989702,0.0000015025805,0.00045472884],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99836606,0.0006509716,0.00008567797,0.000103334554,0.0005318576,0.00026204312],"domain_scores_gemma":[0.99158806,0.0041045416,0.0025539033,0.00021919631,0.00069959636,0.00083479175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017599185,0.00018242453,0.00016815001,0.0006290795,0.00045441187,0.001920896,0.00023606986,0.00028565814,0.0020431818],"category_scores_gemma":[0.00865534,0.00018798964,0.00011861411,0.0004208704,0.00050767674,0.0008682978,0.001099453,0.0005211125,0.00032913827],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063629006,0.00046276322,0.92435515,0.0001342751,0.000045537305,0.00047439127,0.0088652605,0.0011348663,0.0017757257,0.00087848137,0.0007254574,0.061084393],"study_design_scores_gemma":[0.000006950249,0.0001682023,0.9779413,0.0000987864,0.00003049835,0.00030497904,0.013735115,0.003257888,0.000881644,0.00095712364,0.002597272,0.000020264888],"about_ca_topic_score_codex":0.0016622974,"about_ca_topic_score_gemma":0.0025850257,"teacher_disagreement_score":0.0020431818,"about_ca_system_score_codex":0.00045792162,"about_ca_system_score_gemma":0.0013234976,"threshold_uncertainty_score":0.009307444},"labels":[],"label_agreement":null},{"id":"W4413958434","doi":"10.5267/j.jpm.2025.6.004","title":"Makespan optimization in recycling-integrated flow shop scheduling using a modified NEH heuristic with industrial case study","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Scheduling and Optimization Algorithms","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Job shop scheduling; Flow shop scheduling; Heuristic; Scheduling (production processes); Mathematical optimization; Computer science; Mathematics; Schedule","score_opus":0.042887919103189426,"score_gpt":0.2913558559380324,"score_spread":0.248467936834843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958434","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6732766,0.0011155627,0.31382522,0.00041540543,0.00008434694,0.00047199937,0.00037511578,0.00024922224,0.010186455],"genre_scores_gemma":[0.9275657,0.00029875006,0.07009522,0.000030462596,0.000016869073,0.00016973684,0.00010240908,0.000025350444,0.0016954351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991542,0.0004402739,0.000025181027,0.00009162984,0.00011346067,0.00017525099],"domain_scores_gemma":[0.9986357,0.0009721212,0.00013106315,0.000050744187,0.00012407305,0.00008631045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022456516,0.0010102392,0.0014504665,0.0010947766,0.00083885057,0.0009646464,0.0013116953,0.0014172439,0.0014169416],"category_scores_gemma":[0.0022356939,0.0006458446,0.0010684222,0.0011365365,0.0008309773,0.0006728031,0.0007335316,0.000711685,0.000070727976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040844217,0.000052969986,0.00020644502,0.000034216726,0.000013292741,0.00008551968,0.000012561848,0.9959229,0.0002487475,0.0007833849,0.000077322955,0.0025218085],"study_design_scores_gemma":[0.00001619415,0.00006214445,0.00017393442,0.0000039806464,0.000009484951,0.000013922909,0.000018426044,0.9988691,0.00019107148,0.00050950743,0.00012732366,0.0000048859],"about_ca_topic_score_codex":0.016843446,"about_ca_topic_score_gemma":0.014232384,"teacher_disagreement_score":0.016843446,"about_ca_system_score_codex":0.0016317617,"about_ca_system_score_gemma":0.0021121898,"threshold_uncertainty_score":0.033490777},"labels":[],"label_agreement":null},{"id":"W4413958443","doi":"10.5267/j.jpm.2025.6.002","title":"Validation of the e-learning systems success model among project manager education institutions: Legal perspective","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Enterprise Management and Information Systems","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Knowledge management; Project manager; Engineering management; Business; Engineering ethics; Psychology; Project management; Computer science; Engineering; Artificial intelligence; Systems engineering","score_opus":0.022504058295717742,"score_gpt":0.29890958785804683,"score_spread":0.2764055295623291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958443","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9932427,0.00004941742,0.0019521852,0.00055676285,0.0000120671075,0.00013657045,0.00006811817,0.000007086793,0.003975005],"genre_scores_gemma":[0.99839884,0.000032751137,0.0010887234,0.00004220702,0.0000057982293,0.00009869852,0.00007774476,0.0000031815912,0.0002519805],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98130333,0.010619275,0.0011236334,0.0010960113,0.0044058445,0.001451889],"domain_scores_gemma":[0.8822929,0.086566515,0.008947018,0.004473019,0.01438049,0.0033399886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027673665,0.0005537735,0.00074549206,0.0030173713,0.0019045604,0.003666613,0.0015161104,0.0011225978,0.0047938544],"category_scores_gemma":[0.060356423,0.0003764114,0.0015392891,0.0023080187,0.0024878995,0.003229992,0.0033157603,0.0024268804,0.00055005064],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014209148,0.0010594132,0.96815777,0.00007636942,0.00011825585,0.00014080082,0.0041899304,0.0010312537,0.00028763714,0.005066365,0.00040060037,0.019329404],"study_design_scores_gemma":[0.00007477343,0.0016621532,0.92341334,0.00034877943,0.00018468659,0.00018431639,0.027452286,0.0398736,0.0014050349,0.0028851242,0.0024607365,0.000055170447],"about_ca_topic_score_codex":0.00851127,"about_ca_topic_score_gemma":0.006783317,"teacher_disagreement_score":0.027673665,"about_ca_system_score_codex":0.00342274,"about_ca_system_score_gemma":0.0069982265,"threshold_uncertainty_score":0.14635408},"labels":[],"label_agreement":null},{"id":"W4413958448","doi":"10.5267/j.jpm.2025.6.003","title":"Financial structures and their impact on project financial performance: Funding sources, and sustainability, empirical study","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Business; Finance; Project finance; Empirical research","score_opus":0.032009214450295344,"score_gpt":0.3346203808963343,"score_spread":0.3026111664460389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958448","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966725,0.00016649674,0.00022778098,0.00012886513,0.0000019913182,0.00003866249,0.00009391146,0.0000020461584,0.0026675717],"genre_scores_gemma":[0.9990676,0.00014155344,0.0002699322,0.000012087511,0.0000058165456,0.000026650778,0.000072802744,0.0000010331323,0.0004025992],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99623495,0.0015168921,0.00037070745,0.000179035,0.0012178561,0.0004805599],"domain_scores_gemma":[0.94364303,0.020643003,0.023938773,0.00066411396,0.007443574,0.0036676293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004844865,0.00030363962,0.00023819625,0.0031247905,0.00067594147,0.0029973113,0.00044886765,0.00042888004,0.002794996],"category_scores_gemma":[0.02685043,0.00022566688,0.0002147153,0.003638285,0.0010458141,0.00164997,0.0016442013,0.0007952114,0.00030137424],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001229275,0.0003543217,0.96997124,0.0001244761,0.0000609843,0.00023218566,0.002538772,0.0011772282,0.00019031524,0.0018683838,0.0003453499,0.023013866],"study_design_scores_gemma":[0.000009723322,0.00026028542,0.9841173,0.00016598056,0.000045266686,0.00016375029,0.009993608,0.0024341051,0.00038558524,0.0006259932,0.0017796393,0.000018790553],"about_ca_topic_score_codex":0.0057270015,"about_ca_topic_score_gemma":0.008340135,"teacher_disagreement_score":0.0057270015,"about_ca_system_score_codex":0.0024094288,"about_ca_system_score_gemma":0.0036363269,"threshold_uncertainty_score":0.025622368},"labels":[],"label_agreement":null},{"id":"W4413958454","doi":"10.5267/j.jpm.2025.6.005","title":"Unlocking project SDGs in furniture manufacturing: The mediating role of green innovation resilience","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Global trade, sustainability, and social impact","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Resilience (materials science); Business; Materials science","score_opus":0.01721361302785209,"score_gpt":0.2880766414514694,"score_spread":0.2708630284236173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9769091,0.00017124566,0.0046716807,0.0008047149,0.000013071917,0.000048887363,0.000027238735,0.000034009023,0.017320128],"genre_scores_gemma":[0.9989691,0.00006239155,0.0006009115,0.00002798629,0.0000017942297,0.000010646891,0.0000073297024,0.0000020201771,0.0003178112],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99683183,0.0016541043,0.0001344088,0.00032829115,0.0004885109,0.00056280044],"domain_scores_gemma":[0.98758,0.005773622,0.004082557,0.00071323384,0.00068744365,0.0011631696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035311095,0.00039461683,0.00023083838,0.0011813365,0.0010611765,0.002508152,0.0005750722,0.00058934727,0.004104336],"category_scores_gemma":[0.008599719,0.0002051295,0.0005330363,0.00091629586,0.0029774818,0.0019611714,0.0051737083,0.0010158403,0.00018888946],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038519374,0.0016113808,0.6580042,0.00092854665,0.00043676796,0.0015442562,0.03310657,0.01031561,0.011003408,0.09497993,0.000780046,0.18690418],"study_design_scores_gemma":[0.00004002095,0.001012063,0.86401844,0.00084041903,0.00042253645,0.00042452852,0.053932697,0.010450042,0.008712426,0.043167032,0.016860511,0.00011937491],"about_ca_topic_score_codex":0.0029683472,"about_ca_topic_score_gemma":0.0038294136,"teacher_disagreement_score":0.004104336,"about_ca_system_score_codex":0.0021143337,"about_ca_system_score_gemma":0.004131525,"threshold_uncertainty_score":0.018674552},"labels":[],"label_agreement":null},{"id":"W4413958526","doi":"10.5267/j.jpm.2025.6.007","title":"Antecedents of blockchain adoption success: The mediating effect of user satisfaction to enhance project management information systems","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Technology Adoption and User Behaviour","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Blockchain; User satisfaction; Business; Knowledge management; Process management; Computer science; Human–computer interaction; Computer security","score_opus":0.024107715783806726,"score_gpt":0.3840400172042079,"score_spread":0.35993230142040117,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958526","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99396616,0.00012311085,0.00080388755,0.0005165061,0.0000080160535,0.000052183877,0.000054398028,0.000009152761,0.0044665276],"genre_scores_gemma":[0.9992242,0.00008204355,0.00034204056,0.000029803377,0.0000038270355,0.000016593964,0.000019004836,0.0000016790857,0.00028088762],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9965378,0.00176458,0.00026201393,0.0002437738,0.00060616643,0.0005855831],"domain_scores_gemma":[0.9753684,0.014319036,0.0044620195,0.0008681779,0.0024095364,0.0025729444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037591746,0.00029919358,0.00037600021,0.0011565969,0.00094442867,0.0022176786,0.0003062425,0.0006041543,0.006877977],"category_scores_gemma":[0.013088476,0.00029663366,0.0006527537,0.0010421973,0.0011909425,0.0010760757,0.0014233651,0.0010316328,0.00029686707],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016508158,0.0009807525,0.9537568,0.00019853668,0.00016230864,0.00054212584,0.009611967,0.0006080213,0.0012562788,0.00430279,0.0003860597,0.028029226],"study_design_scores_gemma":[0.000021325426,0.0006232827,0.9750574,0.00014856027,0.00015544487,0.00026890068,0.01552614,0.003337427,0.0010809768,0.001926105,0.0018265254,0.000027899276],"about_ca_topic_score_codex":0.0040067905,"about_ca_topic_score_gemma":0.0043512373,"teacher_disagreement_score":0.006877977,"about_ca_system_score_codex":0.0010006188,"about_ca_system_score_gemma":0.003000344,"threshold_uncertainty_score":0.023009181},"labels":[],"label_agreement":null},{"id":"W4413958539","doi":"10.5267/j.jpm.2025.8.005","title":"The mediating effect of sustainability disclosure on the impact of proactive tax planning on firm value: Empirical evidence from ESG100 index","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Corporate Social Responsibility Reporting","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Mahasarakham University","keywords":"Index (typography); Sustainability; Enterprise value; Business; Value (mathematics); Empirical evidence; Tax planning; Corporate sustainability; Accounting; Economics; Value-added tax; Public economics; Tax avoidance; Computer science","score_opus":0.044084366044328804,"score_gpt":0.37813827488814533,"score_spread":0.3340539088438165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958539","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962889,0.0002713902,0.0001778894,0.00034442064,0.000007199877,0.000010319605,0.00014554759,0.0000032181515,0.0027511653],"genre_scores_gemma":[0.9995333,0.00013071127,0.000054106516,0.000015705984,0.000005923639,0.0000023381804,0.0000763667,6.327472e-7,0.00018089007],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99813193,0.00080308795,0.00015823061,0.00019882276,0.000430534,0.00027747755],"domain_scores_gemma":[0.9491673,0.02455771,0.020922082,0.0018040151,0.0019989824,0.0015498416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026241813,0.0002449903,0.0002593335,0.0010372724,0.00046210486,0.0016066105,0.00047050964,0.00045112308,0.003256496],"category_scores_gemma":[0.021415167,0.00014307216,0.0003899212,0.0013959263,0.0007030784,0.0013466759,0.0012171963,0.0007285418,0.0002187193],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005948156,0.00012028721,0.9889936,0.000027873182,0.0000968745,0.00018286279,0.00056904333,0.00042747727,0.00010106986,0.001100134,0.00019448757,0.008126755],"study_design_scores_gemma":[0.0000066442954,0.000102663165,0.9945998,0.000051211275,0.0001308871,0.00008872047,0.0017072761,0.0012198571,0.00029529387,0.0008533727,0.00093473296,0.000009465638],"about_ca_topic_score_codex":0.0071472507,"about_ca_topic_score_gemma":0.007782712,"teacher_disagreement_score":0.0071472507,"about_ca_system_score_codex":0.00077631447,"about_ca_system_score_gemma":0.0013834132,"threshold_uncertainty_score":0.014211297},"labels":[],"label_agreement":null},{"id":"W4413958540","doi":"10.5267/j.jpm.2025.7.001","title":"Project management for sustainability in times of uncertainty: A systematic review of economic policy uncertainty and corporate strategic responses","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Sustainability; Business; Corporate sustainability; Environmental resource management; Economics; Environmental economics; Management science","score_opus":0.08338007988789453,"score_gpt":0.41148918281844726,"score_spread":0.32810910293055273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958540","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001009664,0.9971512,0.00041823337,0.0005777227,0.0000882849,0.00009520726,0.00021229406,0.0000054692614,0.00044202185],"genre_scores_gemma":[0.010942727,0.9874464,0.00079419615,0.0004064018,0.00006406503,0.00014362462,0.0001423768,0.000004253517,0.000055874203],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9901571,0.00386618,0.0030695638,0.0006478716,0.0020687373,0.00019058818],"domain_scores_gemma":[0.9325248,0.054452278,0.008510713,0.0006984057,0.0033475105,0.00046623495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011538838,0.0009092132,0.00289843,0.0095771225,0.00052609557,0.002931241,0.0012573303,0.0016603913,0.0028252136],"category_scores_gemma":[0.052873824,0.0005997922,0.004185031,0.009855308,0.0009523306,0.0033365234,0.0017097822,0.0013863121,0.00021707057],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095113195,0.00005246512,0.0022657649,0.690259,0.0032451237,0.00018960182,0.0007245032,0.0005605462,0.0002292531,0.002536167,0.004532926,0.29530963],"study_design_scores_gemma":[0.00004373259,0.00020314856,0.006254839,0.88092756,0.00946178,0.0005235412,0.001173071,0.00024804525,0.00025527918,0.0025771922,0.09827317,0.000058617752],"about_ca_topic_score_codex":0.0051928996,"about_ca_topic_score_gemma":0.015961323,"teacher_disagreement_score":0.011538838,"about_ca_system_score_codex":0.002178048,"about_ca_system_score_gemma":0.015910117,"threshold_uncertainty_score":0.06102389},"labels":[],"label_agreement":null},{"id":"W4413958571","doi":"10.5267/j.jpm.2025.7.003","title":"Corporation financialization and its impact on green project investments: A systematic literature review","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Private Equity and Venture Capital","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Financialization; Corporation; Business; Economics; Finance","score_opus":0.0202183241794573,"score_gpt":0.30096001300415887,"score_spread":0.2807416888247016,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958571","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004633647,0.99249965,0.00020176862,0.00055084855,0.00009841392,0.00017117546,0.0010226233,0.000008782543,0.00081306475],"genre_scores_gemma":[0.034125593,0.963748,0.0005979958,0.0004617333,0.00008241949,0.00028470528,0.00056975713,0.000007278438,0.00012256295],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.99026334,0.0027601055,0.0034545143,0.0007885818,0.0023704837,0.0003629687],"domain_scores_gemma":[0.9188168,0.060438722,0.012564329,0.0008221344,0.006665042,0.00069300213],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012050963,0.0010516304,0.002950313,0.026248282,0.00078127417,0.0033206237,0.0011796111,0.0017653385,0.00546209],"category_scores_gemma":[0.054973558,0.00087968796,0.0055443933,0.027876634,0.0010483809,0.0031981983,0.001790397,0.001125253,0.00037123554],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022783094,0.000089678666,0.012390959,0.77858776,0.0050090514,0.00030807307,0.0007654013,0.00035709506,0.00017065997,0.0019469853,0.0059319586,0.19421451],"study_design_scores_gemma":[0.000071342874,0.00020635597,0.027404219,0.90543336,0.019106006,0.0006985581,0.0012520415,0.0002175286,0.00024428984,0.0007915523,0.044503648,0.00007118561],"about_ca_topic_score_codex":0.011100464,"about_ca_topic_score_gemma":0.027923577,"teacher_disagreement_score":0.026248282,"about_ca_system_score_codex":0.0037878174,"about_ca_system_score_gemma":0.020900086,"threshold_uncertainty_score":0.063732326},"labels":[],"label_agreement":null},{"id":"W4413958608","doi":"10.5267/j.jpm.2025.8.002","title":"Implementation of artificial intelligence project, quality internal and external supply chain integration, responsiveness for operational performance in manufacturing","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Kristen Petra","keywords":"Supply chain; Quality (philosophy); Manufacturing engineering; Business; Process management; Operations management; Computer science; Engineering; Marketing","score_opus":0.03780335047058881,"score_gpt":0.3483037021658093,"score_spread":0.3105003516952205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962792,0.000039902174,0.0005719684,0.000108403205,0.000002682501,0.000016273845,0.000011761306,0.000007428892,0.002962385],"genre_scores_gemma":[0.9996381,0.000020833417,0.00017496705,0.0000074682257,0.0000013189143,0.000009222529,0.000011309522,0.0000012589356,0.00013561535],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9927955,0.0040205144,0.000530679,0.00038302634,0.0014599473,0.0008102137],"domain_scores_gemma":[0.9817764,0.00776292,0.006398713,0.00059111085,0.0013655822,0.0021052125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004547892,0.00024445506,0.00023223557,0.0007347591,0.0006036012,0.0022747642,0.00034772765,0.00035615687,0.001914775],"category_scores_gemma":[0.012784234,0.00013041776,0.00034219687,0.0012330808,0.0011049528,0.0010560453,0.002245455,0.0007678761,0.0002079386],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002482144,0.0009859178,0.92900753,0.00015216327,0.00013967481,0.000326399,0.0057487735,0.0041071703,0.002216744,0.0023031307,0.0003016228,0.05446272],"study_design_scores_gemma":[0.000008261952,0.00040797683,0.9877995,0.00004110094,0.000052169456,0.000059967017,0.006754952,0.0027782824,0.000947079,0.00035722178,0.0007798536,0.000013532005],"about_ca_topic_score_codex":0.001763871,"about_ca_topic_score_gemma":0.0014125226,"teacher_disagreement_score":0.004547892,"about_ca_system_score_codex":0.0014686792,"about_ca_system_score_gemma":0.0024440493,"threshold_uncertainty_score":0.024051845},"labels":[],"label_agreement":null},{"id":"W4413958615","doi":"10.5267/j.jpm.2025.7.005","title":"Examining the mediating role of user attitudes in the relationship between social media characteristics and e-project management adoption: An empirical analysis","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Technology Adoption and User Behaviour","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Social media; Psychology; Knowledge management; Empirical research; Business; Computer science; World Wide Web; Epistemology","score_opus":0.2524592757904437,"score_gpt":0.45383188418836645,"score_spread":0.20137260839792276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9985946,0.000057316727,0.00029735602,0.000072771116,0.000002457684,0.00003162286,0.000030459823,0.0000016817669,0.0009116678],"genre_scores_gemma":[0.9990989,0.00010188828,0.00043161577,0.000020187535,0.00000315772,0.000040901192,0.000028410863,0.0000012746254,0.00027363884],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9973828,0.0015321594,0.00018562083,0.00020951973,0.00033628248,0.0003536396],"domain_scores_gemma":[0.96937245,0.024351124,0.002934749,0.0007175439,0.0017156319,0.0009086002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050181323,0.00046413494,0.000414358,0.0011361771,0.0007912819,0.0016688553,0.0004576768,0.0006188667,0.005451973],"category_scores_gemma":[0.016229322,0.00036249778,0.0009120105,0.0012121698,0.0008213702,0.0015319423,0.0012673627,0.0010665912,0.0002631525],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017294988,0.00079942204,0.96497715,0.00018382401,0.0001871629,0.00032273287,0.013215055,0.00020546377,0.0006741732,0.0010614053,0.00008899446,0.018111732],"study_design_scores_gemma":[0.000022763186,0.0005586051,0.96055573,0.00019234623,0.0003372557,0.00018684198,0.032874815,0.0028558283,0.0007826585,0.0006611215,0.0009474513,0.000024707482],"about_ca_topic_score_codex":0.0045034476,"about_ca_topic_score_gemma":0.006302094,"teacher_disagreement_score":0.005451973,"about_ca_system_score_codex":0.0006921135,"about_ca_system_score_gemma":0.0019179664,"threshold_uncertainty_score":0.02653873},"labels":[],"label_agreement":null},{"id":"W4413958624","doi":"10.5267/j.jpm.2025.7.002","title":"A learnheuristic method for solving resource constrained project scheduling problem","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Mathematical optimization; Nurse scheduling problem; Scheduling (production processes); Dynamic priority scheduling; Mathematics; Two-level scheduling; Schedule","score_opus":0.08649245206811407,"score_gpt":0.4337959241406147,"score_spread":0.3473034720725006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017103355,0.0008681332,0.9723727,0.00030644645,0.00012094749,0.0001691911,0.00018806139,0.00071994145,0.008151205],"genre_scores_gemma":[0.24792525,0.0011623917,0.73995817,0.0003533608,0.00010650559,0.0008796127,0.0007526371,0.00021920093,0.008643008],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970263,0.00010287427,0.0000168036,0.000048370486,0.00008444326,0.00004483204],"domain_scores_gemma":[0.9996598,0.00019487304,0.000036651407,0.000017290195,0.000072361836,0.000019065923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006055399,0.0010570046,0.0009912872,0.0010546312,0.0004978924,0.00085639296,0.0010401292,0.0012917689,0.0034287795],"category_scores_gemma":[0.0011306432,0.00041924743,0.0013282918,0.0011562064,0.0003940069,0.0006012385,0.0006813136,0.0012309976,0.00052259257],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061395,0.00011348558,0.00067207887,0.0002018757,0.000088025154,0.00013584182,0.000059907277,0.88891554,0.0017126279,0.008178895,0.002582388,0.09727799],"study_design_scores_gemma":[0.000024362394,0.00004553027,0.00013311765,0.000023851162,0.000015143525,0.000035185483,0.000019887497,0.994011,0.00045357848,0.00297868,0.0022525226,0.0000070320043],"about_ca_topic_score_codex":0.0064568175,"about_ca_topic_score_gemma":0.0065078326,"teacher_disagreement_score":0.0064568175,"about_ca_system_score_codex":0.00076651626,"about_ca_system_score_gemma":0.0015220759,"threshold_uncertainty_score":0.012838483},"labels":[],"label_agreement":null},{"id":"W4413958643","doi":"10.5267/j.jpm.2025.8.003","title":"Flexible work environments in enhancing creativity and innovation within emerging projects in Saudi companies","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Socioeconomic Development in MENA","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Creativity; Work (physics); Business; Knowledge management; Engineering management; Process management; Engineering; Computer science; Mechanical engineering; Psychology","score_opus":0.03618229851040351,"score_gpt":0.33831915947796054,"score_spread":0.30213686096755704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9983638,0.00011438624,0.0002659415,0.00007116166,0.0000030934511,0.000007319954,0.0000030176473,0.0000010828197,0.0011701287],"genre_scores_gemma":[0.9994423,0.000090941234,0.0002751475,0.0000135707605,0.0000014259281,0.0000036752851,0.0000030433725,4.8613686e-7,0.00016944639],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998662,0.00070061453,0.00007556,0.00007070977,0.00023705044,0.0002540615],"domain_scores_gemma":[0.9967303,0.00086812483,0.0009107172,0.00016063344,0.00027626415,0.0010538773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018490939,0.00016732757,0.000107676824,0.0005232151,0.0011757409,0.001940797,0.00028155127,0.00030987017,0.0008665481],"category_scores_gemma":[0.0037014843,0.00012492276,0.00020115908,0.0002943941,0.0007531199,0.000778,0.0022829333,0.00040484063,0.0000923547],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003432281,0.0013796994,0.6460325,0.00039660046,0.00008417545,0.0021324519,0.14313209,0.0012180534,0.0082603395,0.0043193707,0.0006853106,0.19201607],"study_design_scores_gemma":[0.000028566465,0.0007188574,0.8354634,0.0002381253,0.000027416821,0.0010588177,0.1476866,0.0012100886,0.0009932149,0.0018007266,0.010726977,0.000047190664],"about_ca_topic_score_codex":0.0012678795,"about_ca_topic_score_gemma":0.003583037,"teacher_disagreement_score":0.001940797,"about_ca_system_score_codex":0.00046826623,"about_ca_system_score_gemma":0.0012769568,"threshold_uncertainty_score":0.009779096},"labels":[],"label_agreement":null},{"id":"W4413958659","doi":"10.5267/j.jpm.2025.8.001","title":"Evaluation and ranking of multi-type projects with mixed multi-criteria cost/benefit and optimization of project portfolio selection","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Multi-Criteria Decision Making","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ranking (information retrieval); Selection (genetic algorithm); Portfolio; Computer science; Portfolio optimization; Operations research; Business; Engineering; Machine learning","score_opus":0.18210984973430155,"score_gpt":0.45462135760972733,"score_spread":0.2725115078754258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958659","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08738528,0.0006199006,0.9061805,0.00015751868,0.000028169452,0.0003638221,0.00011531898,0.00015695156,0.004992455],"genre_scores_gemma":[0.7122445,0.00044497068,0.2831192,0.00005802258,0.000020278878,0.00084988953,0.00023950206,0.000048534406,0.0029751137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9962358,0.0017864945,0.00019701119,0.00028376703,0.0011819471,0.00031505426],"domain_scores_gemma":[0.99731606,0.0014728287,0.00031023854,0.0001272993,0.00060970016,0.00016392073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046929014,0.0017004586,0.0018450718,0.0031281135,0.00054227543,0.0023944962,0.0011363584,0.0012616772,0.0020683312],"category_scores_gemma":[0.005591404,0.00075404195,0.0017639189,0.0024926565,0.00061198475,0.0011296953,0.0015211492,0.0007625587,0.00024276554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007600202,0.00008279782,0.0012833307,0.00017136682,0.00009277472,0.00011293304,0.00005054562,0.9519409,0.0020994048,0.0026347546,0.0003433495,0.04111184],"study_design_scores_gemma":[0.0000070433393,0.00009985056,0.00042554803,0.000016134654,0.00002338669,0.000026014754,0.000026720923,0.9969434,0.00065215706,0.0014795532,0.00029094674,0.0000091933625],"about_ca_topic_score_codex":0.0032136801,"about_ca_topic_score_gemma":0.0026904177,"teacher_disagreement_score":0.0046929014,"about_ca_system_score_codex":0.0013113699,"about_ca_system_score_gemma":0.002103432,"threshold_uncertainty_score":0.024818718},"labels":[],"label_agreement":null},{"id":"W4413958670","doi":"10.5267/j.jpm.2025.8.004","title":"Customer satisfaction in construction projects: Impact of property type and income","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Customer Service Quality and Loyalty","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Customer satisfaction; Business; Property (philosophy); Marketing","score_opus":0.023000772832606126,"score_gpt":0.298698889894933,"score_spread":0.27569811706232683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958670","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984686,0.00010894054,0.00018436363,0.00006446068,0.0000053313256,0.000007158616,0.00008271659,0.0000028282018,0.0010755308],"genre_scores_gemma":[0.99967813,0.00003066578,0.000043478914,0.000009050646,0.0000037323025,0.000004033388,0.000078895275,0.0000014067083,0.00015067446],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99794704,0.00093870057,0.00017529784,0.00011783126,0.0005388014,0.00028232383],"domain_scores_gemma":[0.9924523,0.0031890385,0.0019906312,0.00016864188,0.0010205639,0.0011787263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014442262,0.00016385733,0.00030734285,0.000703841,0.00034321475,0.0010201227,0.00024610845,0.00038540427,0.0032521961],"category_scores_gemma":[0.006299011,0.00010907857,0.0005900259,0.0015072232,0.00032613592,0.000403032,0.0005814351,0.0005234291,0.00028997558],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025192974,0.00017634575,0.9889432,0.00002792343,0.00007475035,0.00018828796,0.00028771692,0.00040501388,0.0002408745,0.0000717797,0.00016344957,0.009168694],"study_design_scores_gemma":[0.0000027388824,0.00024396557,0.99784505,0.0000067593614,0.000020514464,0.00014368349,0.00085891766,0.0005785002,0.00007796827,0.000043055617,0.00017353104,0.0000052053724],"about_ca_topic_score_codex":0.0019482427,"about_ca_topic_score_gemma":0.002586253,"teacher_disagreement_score":0.0032521961,"about_ca_system_score_codex":0.00042406542,"about_ca_system_score_gemma":0.00042155222,"threshold_uncertainty_score":0.010879695},"labels":[],"label_agreement":null},{"id":"W4413958684","doi":"10.5267/j.jpm.2025.8.006","title":"Impact of inclusive leadership on project success through mediating role of project citizenship behavior: Project complexity as a moderator","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Moderation; Organizational citizenship behavior; Citizenship; Psychology; Business; Process management; Political science; Knowledge management; Public relations; Social psychology; Computer science; Organizational commitment; Politics","score_opus":0.2155638787703479,"score_gpt":0.46852040593745564,"score_spread":0.2529565271671077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958684","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9942169,0.00012009046,0.0009771347,0.0003947439,0.00002253951,0.00006554403,0.000032512344,0.000011060841,0.004159408],"genre_scores_gemma":[0.9988206,0.00007200946,0.0004150521,0.00004786017,0.000008610892,0.00005982036,0.000017322665,0.000003950942,0.00055489445],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9918469,0.0049980013,0.0003420633,0.0005991538,0.0008844796,0.0013293183],"domain_scores_gemma":[0.9649679,0.021051573,0.0051670363,0.0015330118,0.002156889,0.005123578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049901404,0.00055748323,0.00053779845,0.0006695549,0.00190261,0.0021171535,0.0005237824,0.00045087634,0.006021418],"category_scores_gemma":[0.019001408,0.00030774044,0.00057750853,0.0005484113,0.0013899826,0.0009986869,0.003967187,0.0013530627,0.00034619254],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005137186,0.0014225646,0.93810785,0.00019161482,0.00026269388,0.00065179425,0.01448637,0.0003505902,0.0018142628,0.0023706278,0.00054773426,0.03928016],"study_design_scores_gemma":[0.0000644857,0.0012709135,0.97456557,0.00022274817,0.00028045848,0.00019367541,0.016249536,0.0016597825,0.001114593,0.0017806179,0.0025639955,0.00003371877],"about_ca_topic_score_codex":0.004433209,"about_ca_topic_score_gemma":0.007894265,"teacher_disagreement_score":0.006021418,"about_ca_system_score_codex":0.0010523018,"about_ca_system_score_gemma":0.005950482,"threshold_uncertainty_score":0.026390731},"labels":[],"label_agreement":null},{"id":"W4413958753","doi":"10.5267/j.jpm.2025.8.007","title":"API-based dynamic programming model and optimization of vehicle routing: Cases of fluctuations in demand, traffic, capacity, and availability","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Transportation and Mobility Innovations","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Dynamic programming; Routing (electronic design automation); Computer science; Vehicle routing problem; On demand; Computer network; Algorithm","score_opus":0.016698694146787072,"score_gpt":0.2610771206123618,"score_spread":0.24437842646557476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958753","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13602589,0.00051178737,0.8318574,0.0010546407,0.0001299989,0.00013209054,0.00092929637,0.0004017879,0.028957104],"genre_scores_gemma":[0.9424494,0.00036662663,0.043759383,0.00009367305,0.000035245987,0.00024995304,0.0003989331,0.000091885086,0.012554897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940896,0.00023601146,0.000020930733,0.00010163347,0.000096356234,0.000136059],"domain_scores_gemma":[0.9990802,0.00058456976,0.00010238811,0.00002679153,0.00015656784,0.000049359565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001106925,0.0009835656,0.0010866274,0.0007269778,0.00054663746,0.0019016303,0.0013666612,0.0013022728,0.0030656324],"category_scores_gemma":[0.0020117268,0.0006201675,0.0010188688,0.001349395,0.0007193177,0.0009763649,0.0009661402,0.0017527329,0.00028714247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017488263,0.000012201638,0.00017544765,0.000012634712,0.000007176216,0.000034179313,0.000012812963,0.9946203,0.00010101675,0.003606359,0.00017780466,0.0012226064],"study_design_scores_gemma":[0.0000012013858,0.0000046916543,0.000040076433,8.929576e-7,0.0000013105451,0.0000028604852,0.0000059532977,0.9992884,0.00001985131,0.0005573784,0.00007606731,0.0000013402619],"about_ca_topic_score_codex":0.029569216,"about_ca_topic_score_gemma":0.017869221,"teacher_disagreement_score":0.029569216,"about_ca_system_score_codex":0.0016193026,"about_ca_system_score_gemma":0.0015970574,"threshold_uncertainty_score":0.0587942},"labels":[],"label_agreement":null},{"id":"W4413958767","doi":"10.5267/j.jpm.2025.7.004","title":"The impact of risk management and agile methodology on cybersecurity project success: the mediating role of team collaboration","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Big Data and Business Intelligence","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Agile software development; Process management; Business; Knowledge management; Engineering management; Engineering; Computer security; Computer science; Software engineering","score_opus":0.04395996788872733,"score_gpt":0.3620569889589801,"score_spread":0.31809702107025273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958767","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9892841,0.00024203259,0.0024856771,0.00064263796,0.000016883512,0.000052418352,0.000011367269,0.000014008768,0.0072508617],"genre_scores_gemma":[0.99861526,0.00013923427,0.00093486154,0.00002801934,0.0000064254914,0.000032434476,0.000005167165,0.0000034927193,0.00023513661],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9752901,0.018870244,0.00083696813,0.0008249734,0.0024120004,0.0017656094],"domain_scores_gemma":[0.8756489,0.08405946,0.021117188,0.003913045,0.0039864364,0.01127495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011911165,0.0005428435,0.00035568082,0.0016762104,0.0020556971,0.003910982,0.0006276503,0.0006444179,0.0038279404],"category_scores_gemma":[0.05479621,0.00034243363,0.0005332472,0.0008647545,0.0019528172,0.0025391406,0.0065488783,0.0013527708,0.00028900348],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033880482,0.0019609649,0.733107,0.0004920821,0.0004993134,0.0016250585,0.07702056,0.00176686,0.0031266522,0.010380739,0.0007109714,0.16897106],"study_design_scores_gemma":[0.00010718317,0.0026039302,0.8120667,0.001101803,0.0003992489,0.0012098653,0.15394786,0.005815085,0.0024560941,0.010188054,0.009986437,0.000117762596],"about_ca_topic_score_codex":0.0016593515,"about_ca_topic_score_gemma":0.0016780172,"teacher_disagreement_score":0.011911165,"about_ca_system_score_codex":0.00115449,"about_ca_system_score_gemma":0.006482159,"threshold_uncertainty_score":0.06299305},"labels":[],"label_agreement":null},{"id":"W4413958784","doi":"10.5267/j.jpm.2025.6.001","title":"Project management using the PMBOK to improve productivity in the pastry industry in Huancayo","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Business, Education, Mathematics Research","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Pastry; Productivity; Agricultural science; Business; Environmental science; Chemistry; Economics; Food science","score_opus":0.05358929402962368,"score_gpt":0.3576894306808949,"score_spread":0.3041001366512712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413958784","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9970687,0.000060127342,0.0010501796,0.000103266044,0.0000025638517,0.000060406666,0.0000212087,0.0000084880485,0.0016250507],"genre_scores_gemma":[0.99486744,0.00009860675,0.0038370257,0.0000122051115,0.0000016311145,0.000039305964,0.000031780375,0.0000024140174,0.0011095393],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993531,0.0003263781,0.000029444118,0.00007721282,0.000107298794,0.00010649821],"domain_scores_gemma":[0.9992306,0.00019701634,0.00018856171,0.000056410343,0.00022025597,0.00010708876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013047421,0.00017373852,0.00020646893,0.0006827042,0.0010646776,0.00058803597,0.000431211,0.00016054061,0.00085829356],"category_scores_gemma":[0.0015658448,0.00020415116,0.000091334565,0.00088502624,0.00052194984,0.0003177556,0.0006073073,0.00023731918,0.00006858108],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007456114,0.0017347062,0.54206353,0.0007193193,0.000043699976,0.0017286768,0.031216506,0.0106473025,0.03256587,0.0054945513,0.0017767246,0.3712635],"study_design_scores_gemma":[0.00004554793,0.0009368598,0.9344886,0.00015267658,0.000025992877,0.00026062617,0.030002465,0.015687145,0.0056325193,0.0007880435,0.011935528,0.00004392952],"about_ca_topic_score_codex":0.055624682,"about_ca_topic_score_gemma":0.10853729,"teacher_disagreement_score":0.055624682,"about_ca_system_score_codex":0.002673118,"about_ca_system_score_gemma":0.0055180644,"threshold_uncertainty_score":0.11060184},"labels":[],"label_agreement":null},{"id":"W4415659013","doi":"10.26425/3034-6916-2025-1-3-51-59","title":"Genesis of public-private partnership in foreign countries","year":2025,"lang":"","type":"article","venue":"Journal of Project Management","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"General partnership; State (computer science); Public–private partnership; Politics; Private sector; Power (physics)","score_opus":0.051075974041108356,"score_gpt":0.30327610102043995,"score_spread":0.2522001269793316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415659013","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23498917,0.010970811,0.012003353,0.008272241,0.0004270311,0.000092664435,0.00010224145,0.00008670725,0.7330558],"genre_scores_gemma":[0.98296887,0.0020630138,0.0011519308,0.0003168801,0.00005905424,0.00004024381,0.000024510997,0.00001391776,0.013361529],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9978114,0.0011335996,0.00008286026,0.00022442617,0.00026391764,0.0004837157],"domain_scores_gemma":[0.998684,0.00057096535,0.00016142114,0.0001842517,0.00018475529,0.00021457102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037799752,0.00019191652,0.00019744107,0.0012215989,0.00336371,0.006724018,0.00035033605,0.0013560447,0.0035877374],"category_scores_gemma":[0.0034294184,0.00022051363,0.00015675904,0.0023338355,0.004660303,0.0045329095,0.004221545,0.0022026142,0.00034992816],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001998858,0.00001771069,0.00097533874,0.000046719608,0.0000026761847,0.00050187466,0.013412029,0.00031394445,0.000107456784,0.96164596,0.0011347729,0.021821655],"study_design_scores_gemma":[0.00001808746,0.00014306372,0.009030742,0.0006378786,0.000012389182,0.0018404694,0.033780232,0.0013149573,0.0010499143,0.12924923,0.82287747,0.000045496934],"about_ca_topic_score_codex":0.0028890013,"about_ca_topic_score_gemma":0.0017286916,"teacher_disagreement_score":0.006724018,"about_ca_system_score_codex":0.0046918252,"about_ca_system_score_gemma":0.0039992714,"threshold_uncertainty_score":0.034041703},"labels":[],"label_agreement":null},{"id":"W4417240499","doi":"10.5267/j.jpm.2025.9.008","title":"Did innovation projects, digital work environment, job satisfaction, and organizational culture reinforce work productivity?","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Employee Performance and Management","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Job satisfaction; Structural equation modeling; Path analysis (statistics); Organizational culture; Work (physics); Likert scale; Simple random sample; Work motivation","score_opus":0.013769188548110755,"score_gpt":0.26860601569878634,"score_spread":0.25483682715067557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240499","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9965575,0.00032513656,0.00046895427,0.00027412712,0.000014137247,0.000020497804,0.000018691288,0.000003180688,0.002317821],"genre_scores_gemma":[0.99936885,0.0001318827,0.00017375908,0.00004093273,0.000010391705,0.000011392807,0.0000098963355,0.0000013762118,0.00025149822],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99778736,0.0010939852,0.00011330027,0.00021094044,0.00040902794,0.00038534158],"domain_scores_gemma":[0.9874576,0.006379835,0.003154268,0.00042008702,0.00088867906,0.0016996391],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030888356,0.00022399309,0.00037114832,0.0007903403,0.0005348998,0.0016346422,0.00037429182,0.0006776781,0.0029751188],"category_scores_gemma":[0.010437445,0.00021278345,0.00040633712,0.00067950605,0.0008243537,0.0008482977,0.0010849346,0.00074282533,0.0002561148],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031870636,0.0011668206,0.94287914,0.00018908911,0.00025184738,0.00017195872,0.0025474466,0.00022552493,0.0012036735,0.0015108999,0.0001393074,0.049395695],"study_design_scores_gemma":[0.000013586603,0.00028259435,0.99517787,0.00004871019,0.00008157881,0.00007531729,0.0025964477,0.00033080432,0.00036137682,0.0005772175,0.00044672328,0.00000771873],"about_ca_topic_score_codex":0.0011439627,"about_ca_topic_score_gemma":0.0016223775,"teacher_disagreement_score":0.0030888356,"about_ca_system_score_codex":0.00061916554,"about_ca_system_score_gemma":0.0014082735,"threshold_uncertainty_score":0.016335487},"labels":[],"label_agreement":null},{"id":"W4417240584","doi":"10.5267/j.jpm.2025.9.003","title":"Introduction to the multi-skilled resource constrained multi project and multi type scheduling problem","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Dynamic priority scheduling; Fair-share scheduling; Job shop scheduling; Heuristic; Rate-monotonic scheduling","score_opus":0.08290173135990164,"score_gpt":0.3948822512101021,"score_spread":0.3119805198502005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240584","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009162,0.00283598,0.96109444,0.0021542327,0.0005341618,0.0004608332,0.001543614,0.00017124324,0.022043524],"genre_scores_gemma":[0.1473222,0.0055725896,0.8330015,0.00077101734,0.0008349447,0.0010527226,0.0013256957,0.00012180235,0.00999757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9974452,0.0012656637,0.00014051374,0.0005298411,0.0004524112,0.00016628245],"domain_scores_gemma":[0.99630886,0.002736655,0.0003098549,0.00018519493,0.00029777887,0.00016165656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024856878,0.0014381277,0.001120902,0.0012642352,0.0007465062,0.0016720601,0.0016348796,0.002041348,0.009186781],"category_scores_gemma":[0.003854045,0.00062432716,0.0014521712,0.0035942257,0.0011691756,0.0015076553,0.0012805674,0.0035173215,0.0010683439],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121431825,0.0004302905,0.0016411489,0.0011457405,0.000117228636,0.0005365396,0.00021495124,0.6524471,0.0017934133,0.19405898,0.019367851,0.12812538],"study_design_scores_gemma":[0.00009077266,0.00028244508,0.0015335002,0.00023920016,0.000048236263,0.0006585537,0.00018328713,0.7404228,0.0010349518,0.1783576,0.077067316,0.00008126493],"about_ca_topic_score_codex":0.0047446527,"about_ca_topic_score_gemma":0.0046175933,"teacher_disagreement_score":0.009186781,"about_ca_system_score_codex":0.00164539,"about_ca_system_score_gemma":0.002930901,"threshold_uncertainty_score":0.03073281},"labels":[],"label_agreement":null},{"id":"W4417240658","doi":"10.5267/j.jpm.2025.9.006","title":"Project portfolio management in the age of artificial intelligence: A review of challenges, key features, and future research directions","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interpretability; Project portfolio management; Portfolio; Key (lock); Resource (disambiguation); Project management; Risk management","score_opus":0.19976148629253365,"score_gpt":0.4690067012819878,"score_spread":0.26924521498945414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240658","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00019174966,0.99615234,0.00058831304,0.0023016916,0.0001696402,0.000009483687,0.00001322935,0.0000056778554,0.00056792883],"genre_scores_gemma":[0.0017262629,0.9964401,0.00085496804,0.00061857386,0.0002384959,0.000020557307,0.00001841733,0.0000024273127,0.000080170874],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99700755,0.0010740435,0.00059116463,0.0002974817,0.0009197392,0.00011013544],"domain_scores_gemma":[0.9831498,0.013370414,0.0011530981,0.00019298561,0.0018364256,0.00029721437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071641216,0.0009948455,0.0019326021,0.0057601454,0.0006711917,0.0043930244,0.0015761408,0.0025782418,0.0022525662],"category_scores_gemma":[0.011862194,0.00061742746,0.0011717165,0.008144392,0.0016475877,0.0056897257,0.001446199,0.0025587173,0.00058849546],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052159863,0.00008631802,0.00075820356,0.05987991,0.00022448585,0.00014057025,0.000549442,0.0017877596,0.0003692586,0.026534254,0.01591608,0.89370143],"study_design_scores_gemma":[0.00003640608,0.00025740144,0.0032655166,0.10755242,0.0005592227,0.00070602325,0.0013775782,0.0017714442,0.0003784913,0.046496704,0.8374801,0.000118772274],"about_ca_topic_score_codex":0.0024964141,"about_ca_topic_score_gemma":0.0041808304,"teacher_disagreement_score":0.0071641216,"about_ca_system_score_codex":0.0023292324,"about_ca_system_score_gemma":0.0068377554,"threshold_uncertainty_score":0.03788793},"labels":[],"label_agreement":null},{"id":"W4417240676","doi":"10.5267/j.jpm.2025.9.004","title":"Flood risk in an Andean Peruvian city: A risk evaluation and mitigation project proposal","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Flood Risk Assessment and Management","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Flood myth; Risk assessment; Vulnerability (computing); Hazard; Natural disaster; Risk management","score_opus":0.01260403828668641,"score_gpt":0.31452804413994156,"score_spread":0.30192400585325513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240676","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9742658,0.00032584445,0.0061616455,0.0021897492,0.00001512354,0.0027973123,0.00042697223,0.000071101735,0.013746518],"genre_scores_gemma":[0.9724023,0.0013071212,0.017248236,0.00016789748,0.000021222764,0.0032167968,0.0005148875,0.000011893203,0.005109735],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99684453,0.0024333529,0.00009134638,0.00010036447,0.0003205118,0.0002098903],"domain_scores_gemma":[0.9981623,0.00082558923,0.0002465236,0.00011994817,0.00043991444,0.00020574102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046102065,0.00059016596,0.0003143975,0.0017786879,0.0017554081,0.0016772483,0.00090536155,0.0009156037,0.002265406],"category_scores_gemma":[0.0060413796,0.0002705924,0.0004241764,0.001766918,0.00087643636,0.0010077208,0.0026990524,0.0005643627,0.00021748221],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010556497,0.0092733735,0.37162736,0.0023111359,0.00029523208,0.010224188,0.06856366,0.030307397,0.008326023,0.019496832,0.011943049,0.46657616],"study_design_scores_gemma":[0.0004450263,0.019605879,0.6139288,0.0011979645,0.0005681902,0.0031055934,0.23439516,0.038172524,0.0065900683,0.012225486,0.0694411,0.0003242279],"about_ca_topic_score_codex":0.0075811716,"about_ca_topic_score_gemma":0.01188773,"teacher_disagreement_score":0.0075811716,"about_ca_system_score_codex":0.0021373935,"about_ca_system_score_gemma":0.0047229463,"threshold_uncertainty_score":0.0243814},"labels":[],"label_agreement":null},{"id":"W4417240729","doi":"10.5267/j.jpm.2025.10.001","title":"Economic transformation and the institutional environment for entrepreneurship in times of change, using Ukraine as an example","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Business and Economic Development","field":"Environmental Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Entrepreneurship; Adaptability; Index (typography); Climate change; Economic transformation; Economic recovery; Business environment; Position (finance); Economic security","score_opus":0.054453434039054095,"score_gpt":0.2613820901434205,"score_spread":0.20692865610436642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8777877,0.0025118808,0.005848876,0.0053145518,0.00009356091,0.000042843763,0.00013771818,0.00003204574,0.10823085],"genre_scores_gemma":[0.99828005,0.0004844312,0.00045226744,0.00004584051,0.000007540418,0.000008320121,0.00002049149,0.0000038478724,0.0006972012],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99940956,0.0003075762,0.000024485927,0.000057398258,0.00006219414,0.00013875068],"domain_scores_gemma":[0.99937624,0.00021009332,0.0001951899,0.000053562322,0.000059698807,0.00010531905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009047566,0.00017967251,0.00020932592,0.0012077591,0.0026820544,0.0046369443,0.00028793584,0.0004885009,0.0014009925],"category_scores_gemma":[0.0014928941,0.0001063969,0.00029720264,0.0014384441,0.004401392,0.0027012057,0.003757282,0.0006996455,0.0001428768],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014696392,0.00021509644,0.11547368,0.00036202266,0.00009518432,0.005641856,0.082788646,0.012290378,0.0018336657,0.6986038,0.0031878934,0.07936084],"study_design_scores_gemma":[0.00002235566,0.00016987213,0.33357844,0.0007288576,0.000049458948,0.0016510934,0.22023185,0.00990598,0.001419799,0.2394932,0.1926658,0.00008325169],"about_ca_topic_score_codex":0.005922164,"about_ca_topic_score_gemma":0.008075498,"teacher_disagreement_score":0.005922164,"about_ca_system_score_codex":0.0035467108,"about_ca_system_score_gemma":0.0024677657,"threshold_uncertainty_score":0.025733352},"labels":[],"label_agreement":null},{"id":"W4417240746","doi":"10.5267/j.jpm.2025.10.002","title":"Strengthening disaster mitigation of mount Sinabung through the integration of local wisdom and social resilience: a participatory study in Karo Regency","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Disaster Management and Resilience","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Sumatera Utara","keywords":"Disaster mitigation; Technocracy; Citizen journalism; Community resilience; Participatory action research; Local community; Qualitative property; Psychological resilience; Capacity building","score_opus":0.0397783860113545,"score_gpt":0.3758306996245475,"score_spread":0.336052313613193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240746","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9965995,0.00010408962,0.0004498166,0.00050834246,0.000013179503,0.00014699232,0.000010795624,0.000003300417,0.002163997],"genre_scores_gemma":[0.99676055,0.00019191156,0.0008344164,0.00017423445,0.000010195414,0.00021998762,0.000010904534,0.0000042824217,0.0017935563],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9973469,0.0018438611,0.000038288123,0.00019750498,0.0001351392,0.00043828256],"domain_scores_gemma":[0.9974529,0.0016728024,0.00020453133,0.00011467086,0.0001019574,0.00045324257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006137449,0.00047515176,0.00065952155,0.0009860514,0.014597509,0.0023220365,0.0012827555,0.0016252379,0.003118456],"category_scores_gemma":[0.0038801765,0.00039914896,0.00031960523,0.0009960225,0.008556777,0.0022768485,0.004599368,0.0018848322,0.00019370568],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040420087,0.0002646839,0.0040467526,0.00010288472,0.00000453228,0.0015030273,0.98572874,0.00011095598,0.001205508,0.0016934942,0.0002483359,0.0050506927],"study_design_scores_gemma":[0.000008352087,0.00014400395,0.003921876,0.00007010445,0.000004796502,0.00013624661,0.9901742,0.000123261,0.0001731637,0.0003722044,0.0048619807,0.0000098063865],"about_ca_topic_score_codex":0.011273044,"about_ca_topic_score_gemma":0.03738657,"teacher_disagreement_score":0.014597509,"about_ca_system_score_codex":0.0030669342,"about_ca_system_score_gemma":0.0048642657,"threshold_uncertainty_score":0.032458305},"labels":[],"label_agreement":null},{"id":"W4417240839","doi":"10.5267/j.jpm.2025.10.004","title":"The role of project management, public open space management and environmental quality on visitor comfort in tourism area","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Community-based Tourism Development and Sustainability","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Visitor pattern; Likert scale; Tourism; Scale (ratio); Simple random sample; Structural equation modeling; Data collection; Reliability (semiconductor); Quality (philosophy); Public open space","score_opus":0.024969586808741343,"score_gpt":0.3401761907080864,"score_spread":0.3152066038993451,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240839","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99735093,0.00026891,0.000100430305,0.00010299998,0.0000031486563,0.000007506041,0.000016461476,0.0000018527143,0.0021478352],"genre_scores_gemma":[0.99937195,0.00013459242,0.00008790925,0.000014208725,0.000003630566,0.0000046634823,0.0000143113875,9.2750213e-7,0.0003678558],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988606,0.0005136221,0.000059348833,0.000085498184,0.00023201686,0.00024890728],"domain_scores_gemma":[0.995754,0.0015522115,0.0013145349,0.00009731492,0.00036255634,0.000919461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084698,0.00017088596,0.00021580697,0.00046613882,0.00068502536,0.0014424565,0.0002915693,0.00033908724,0.002725693],"category_scores_gemma":[0.0030989822,0.00012105955,0.00042162734,0.0005576967,0.00070117105,0.00064310065,0.001103579,0.00048320173,0.00012070258],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014294327,0.00031808796,0.969322,0.00017929754,0.00012807452,0.00047071633,0.005396663,0.0003199661,0.00086635345,0.0005554085,0.0003163623,0.0219841],"study_design_scores_gemma":[0.0000019929573,0.00013848404,0.98946893,0.000039453837,0.000030777243,0.00015560279,0.009208625,0.00023458959,0.00007904894,0.00009768039,0.000538235,0.0000065679624],"about_ca_topic_score_codex":0.0052153934,"about_ca_topic_score_gemma":0.012157599,"teacher_disagreement_score":0.0052153934,"about_ca_system_score_codex":0.00065989787,"about_ca_system_score_gemma":0.0010467537,"threshold_uncertainty_score":0.010370076},"labels":[],"label_agreement":null},{"id":"W4417240877","doi":"10.5267/j.jpm.2025.10.005","title":"Assessing the impacts of human capital management and financial development on energy transition in Saudi Arabia","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Energy, Environment, Economic Growth","field":"Economics, Econometrics and Finance","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Human capital; Sustainable development; Renewable energy; Workforce; Energy (signal processing); Energy transition; Financial management; Capital (architecture)","score_opus":0.0204844105092059,"score_gpt":0.24283418718782906,"score_spread":0.22234977667862316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417240877","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987192,0.00021417419,0.000117271964,0.00026194163,0.0000032743956,0.0000048536535,0.00006798025,0.0000014314354,0.0006097733],"genre_scores_gemma":[0.9996362,0.00010572648,0.00004200763,0.000017597837,0.0000020495613,0.000002091824,0.000050582425,3.6786932e-7,0.00014330326],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994295,0.00020477058,0.000037573653,0.000043042597,0.000081118225,0.00020402108],"domain_scores_gemma":[0.99690324,0.0010593993,0.000812363,0.00006834823,0.00061244844,0.00054403994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013946148,0.00023111762,0.00019166106,0.00070081133,0.00034612342,0.0016025649,0.00029259713,0.0004129719,0.0010722496],"category_scores_gemma":[0.0038988763,0.00009677373,0.0002921996,0.0006564254,0.0004553155,0.0011081537,0.0013945696,0.00060176133,0.00013157468],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029718713,0.0001739915,0.96448517,0.00007161206,0.00012846616,0.00042733934,0.00094660575,0.007399559,0.00041053537,0.0026365882,0.00039430227,0.022628624],"study_design_scores_gemma":[0.000010501582,0.00021385086,0.9717386,0.00006719971,0.000074150914,0.000064998094,0.008182686,0.016295858,0.00073770457,0.00081441685,0.0017831702,0.000016867738],"about_ca_topic_score_codex":0.06259402,"about_ca_topic_score_gemma":0.055962842,"teacher_disagreement_score":0.06259402,"about_ca_system_score_codex":0.0022054676,"about_ca_system_score_gemma":0.0025077916,"threshold_uncertainty_score":0.124459386},"labels":[],"label_agreement":null},{"id":"W4417241113","doi":"10.5267/j.jpm.2025.10.007","title":"Behavior based safety in projects: A bibliometric analysis of global literature","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Scopus; Globe; Categorization; Bibliographic coupling; Systematic review; Conceptual framework","score_opus":0.0676044286500014,"score_gpt":0.5108317806823656,"score_spread":0.4432273520323642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417241113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79193366,0.09966613,0.004376439,0.004008315,0.00028907176,0.001195804,0.057058327,0.0004524742,0.041019715],"genre_scores_gemma":[0.89069146,0.06584111,0.012131205,0.0003213013,0.0003202659,0.0011967121,0.027568264,0.00012579905,0.0018039132],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9864129,0.002239916,0.003561542,0.0012088565,0.0060244487,0.0005523676],"domain_scores_gemma":[0.9236963,0.049184717,0.011176628,0.0019028346,0.012762479,0.0012770977],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.010831679,0.00068701257,0.0020721436,0.26286975,0.0021440724,0.006135097,0.0009886976,0.00087265234,0.003532113],"category_scores_gemma":[0.0564849,0.00039706205,0.0016469432,0.26622415,0.0013250672,0.0051836506,0.004385198,0.0006222584,0.00060526584],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047297816,0.00022717257,0.38571122,0.06907361,0.0028144422,0.0015993689,0.02280026,0.0017472004,0.0036927362,0.011220549,0.026389204,0.4742513],"study_design_scores_gemma":[0.00009191137,0.00033613213,0.8025321,0.017550802,0.00395825,0.0028508082,0.039236207,0.004512968,0.002146705,0.0074337255,0.119108096,0.0002423298],"about_ca_topic_score_codex":0.006352322,"about_ca_topic_score_gemma":0.007681219,"teacher_disagreement_score":0.7371303,"about_ca_system_score_codex":0.0032494662,"about_ca_system_score_gemma":0.006305966,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4417241120","doi":"10.5267/j.jpm.2025.10.008","title":"Building manufacturing operational performance through management commitment, information technology adoption, supply chain transparency and practices","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Supply Chain Resilience and Risk Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Direktorat Jenderal Pendidikan Tinggi; Universitas Kristen Petra","keywords":"Supply chain; Supply chain management; Information technology; Transparency (behavior); Supply chain risk management; Service management; Demand chain","score_opus":0.015261057440741032,"score_gpt":0.2838264406449211,"score_spread":0.26856538320418005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417241120","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9833172,0.00009576974,0.0064971196,0.00051374803,0.0000068789154,0.000059066606,0.000024595094,0.00004424049,0.0094413925],"genre_scores_gemma":[0.99859434,0.000027918037,0.0011803065,0.000014417289,0.000002563417,0.00001036432,0.000011846001,0.000003174279,0.00015494358],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9897915,0.005026412,0.00067159877,0.00047973017,0.0030884277,0.00094225816],"domain_scores_gemma":[0.96076375,0.017692968,0.012945772,0.0029762443,0.0037180358,0.0019032438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0082843285,0.00036490266,0.00023076092,0.001369452,0.0010435758,0.0041972823,0.00043110395,0.00047676687,0.0015700116],"category_scores_gemma":[0.029567359,0.00019015478,0.0002645406,0.0014538656,0.0012314704,0.002916973,0.002648933,0.0010579384,0.00025447257],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034614257,0.0018774834,0.6052621,0.00036674057,0.00027410974,0.00029031857,0.01597737,0.017926473,0.009957413,0.013758884,0.0011281839,0.33283472],"study_design_scores_gemma":[0.00003525628,0.0016949187,0.93175936,0.00035537797,0.00011685083,0.00018011499,0.019812094,0.02380434,0.008524961,0.007740849,0.005841085,0.00013484317],"about_ca_topic_score_codex":0.0016028555,"about_ca_topic_score_gemma":0.0016910463,"teacher_disagreement_score":0.0082843285,"about_ca_system_score_codex":0.0014828884,"about_ca_system_score_gemma":0.0022385418,"threshold_uncertainty_score":0.043812275},"labels":[],"label_agreement":null},{"id":"W4417241138","doi":"10.5267/j.jpm.2025.11.001","title":"The impact of change management on organizational performance: The mediating role of organizational culture","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Organizational Change and Leadership","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Organizational commitment; Organizational performance; Organizational behavior and human resources; Organizational culture; Mediation; Change management (ITSM); Organizational learning; Organization development; Organizational studies","score_opus":0.030603983267759528,"score_gpt":0.270882206153386,"score_spread":0.24027822288562645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417241138","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99323636,0.00036233285,0.0005972059,0.0005598814,0.0000098364135,0.000031428175,0.000023295685,0.0000063217044,0.0051732706],"genre_scores_gemma":[0.9993655,0.00015871304,0.00021722112,0.00004789084,0.000006342833,0.00001668913,0.0000107179185,0.0000014837977,0.00017550484],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.994031,0.004108002,0.00019262973,0.00043953725,0.00065330137,0.0005754998],"domain_scores_gemma":[0.97636855,0.016833225,0.003242564,0.0010436483,0.0012446297,0.001267409],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040213875,0.0005144493,0.00045184573,0.0010210235,0.0012526356,0.0030398995,0.0005827145,0.0007817727,0.0036164685],"category_scores_gemma":[0.016631441,0.00027773954,0.0006470245,0.00078278995,0.0018856783,0.0017945127,0.0026759084,0.0009479003,0.00024082145],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000283607,0.0013513394,0.8953621,0.00045508344,0.0005770115,0.0006429445,0.023211334,0.0005448149,0.0029032906,0.0035163101,0.00027102127,0.070881166],"study_design_scores_gemma":[0.000023070654,0.0006247195,0.9786379,0.00025314355,0.0002444065,0.00016905506,0.015192133,0.0012081158,0.0012581095,0.0012165616,0.0011483487,0.000024450337],"about_ca_topic_score_codex":0.0033251273,"about_ca_topic_score_gemma":0.003892269,"teacher_disagreement_score":0.0040213875,"about_ca_system_score_codex":0.0011068328,"about_ca_system_score_gemma":0.002256331,"threshold_uncertainty_score":0.021267414},"labels":[],"label_agreement":null},{"id":"W4417241232","doi":"10.5267/j.jpm.2025.11.002","title":"Digital transformation and supply chain competitiveness: Evidence of dynamic capabilities from an emerging economy","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Enabling; Competitive advantage; Dynamic capabilities; Digital transformation; Supply chain; Agile software development; Emerging markets; Mediation; Digital economy","score_opus":0.013518458678768292,"score_gpt":0.2659295862805101,"score_spread":0.25241112760174184,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417241232","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98735434,0.0005869385,0.0002067351,0.00039934355,0.000005230884,0.000011561402,0.00007009366,0.0000017256898,0.011364058],"genre_scores_gemma":[0.9991167,0.00039298867,0.000079955775,0.000049481416,0.0000062386925,0.000004252131,0.000066629174,9.276066e-7,0.00028292308],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99911946,0.00026792826,0.00007641542,0.0001288616,0.00020877838,0.0001985355],"domain_scores_gemma":[0.98500556,0.0056030755,0.0057633515,0.0005009221,0.0019788246,0.0011483686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018600887,0.00021710347,0.00021913409,0.0026015292,0.0007937454,0.002887871,0.00044107693,0.0004870071,0.0055179913],"category_scores_gemma":[0.006630495,0.0001501774,0.0003101368,0.0038170589,0.0015119943,0.0024558767,0.0022688878,0.0008734285,0.0004075327],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015097897,0.00043962788,0.9513512,0.00019977787,0.000116926705,0.0011790352,0.007877784,0.00048527415,0.00030402263,0.009600066,0.0005077256,0.02778751],"study_design_scores_gemma":[0.000026081254,0.00016228178,0.945699,0.00022844186,0.00009909193,0.00045982553,0.04309386,0.0010759155,0.0005717469,0.0032675217,0.0052900165,0.000026209616],"about_ca_topic_score_codex":0.006743821,"about_ca_topic_score_gemma":0.009455456,"teacher_disagreement_score":0.006743821,"about_ca_system_score_codex":0.0010161855,"about_ca_system_score_gemma":0.002481292,"threshold_uncertainty_score":0.018459499},"labels":[],"label_agreement":null},{"id":"W4417241239","doi":"10.5267/j.jpm.2025.11.005","title":"Project-oriented supply chain and innovation strategies for competitive advantage: An empirical study of SMEs in West Java","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Competitive advantage; Supply chain; Empirical research; Supply chain management; Structural equation modeling; Boosting (machine learning); Operational effectiveness; Operational efficiency","score_opus":0.038599865290700835,"score_gpt":0.3577525078672659,"score_spread":0.31915264257656506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417241239","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9994147,0.000017250302,0.00006537621,0.000020141926,3.586272e-7,0.0000039732677,0.000008359763,4.2717468e-7,0.00046942322],"genre_scores_gemma":[0.9996753,0.00003782279,0.00009827097,0.000013308029,8.096209e-7,0.0000046655205,0.0000126750665,6.523373e-7,0.00015646074],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99938023,0.00018013251,0.000061801205,0.00007712365,0.00013718326,0.00016356484],"domain_scores_gemma":[0.9954461,0.0018021184,0.0016160941,0.00012991572,0.00047952175,0.000526254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013699757,0.0001620112,0.00022084166,0.0010251357,0.0006952735,0.0013289182,0.0002472119,0.00028428747,0.0014417128],"category_scores_gemma":[0.0031927607,0.000157065,0.00019301007,0.001526907,0.0005867083,0.0014394562,0.0008196052,0.0004389558,0.00022754158],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007981238,0.0006005392,0.96708304,0.00007495992,0.000020530695,0.0007058538,0.014852409,0.00019559322,0.0014030332,0.0006271632,0.00011846959,0.014238548],"study_design_scores_gemma":[0.0000065851236,0.00027739521,0.94273204,0.000053193235,0.000026312075,0.00025229942,0.053640556,0.0010945079,0.00056830095,0.00020547019,0.0011312258,0.000012041836],"about_ca_topic_score_codex":0.0063663237,"about_ca_topic_score_gemma":0.015032558,"teacher_disagreement_score":0.0063663237,"about_ca_system_score_codex":0.0008556523,"about_ca_system_score_gemma":0.0012517811,"threshold_uncertainty_score":0.012658536},"labels":[],"label_agreement":null},{"id":"W4417241268","doi":"10.5267/j.jpm.2025.11.006","title":"Assessing the role of digital logistics agility in enhancing intelligent quality management: The mediating influence of green sourcing strategies, an empirical investigation","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Organizational and Employee Performance","field":"Computer Science","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Al-Imam Muhammad Ibn Saud Islamic University","keywords":"Supply chain; Agile software development; Supply chain management; Quality (philosophy); Digital transformation; Mediation; Green logistics; Structural equation modeling; Sustainability","score_opus":0.04156857342424176,"score_gpt":0.35751226256362995,"score_spread":0.3159436891393882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417241268","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.988816,0.00034794785,0.0010077297,0.00047684042,0.000009651609,0.00009295232,0.00006013714,0.000008396305,0.009180346],"genre_scores_gemma":[0.9981281,0.00027256855,0.0007923552,0.00006334856,0.0000067369688,0.00004455279,0.000030705927,0.0000033471842,0.0006581763],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99682486,0.001695322,0.00015764184,0.000346735,0.00052657246,0.0004488987],"domain_scores_gemma":[0.9726379,0.018995257,0.0038015756,0.000974314,0.0021963706,0.0013945119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044495347,0.00071466865,0.0005115426,0.0017767375,0.0013173644,0.004505415,0.0008874358,0.0008940848,0.007984104],"category_scores_gemma":[0.013712546,0.00033091436,0.000917376,0.0015825522,0.0021630835,0.00336359,0.0033745912,0.0013351109,0.00040503748],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004247509,0.0017545982,0.88628465,0.0010266377,0.00052424404,0.0011712323,0.02673331,0.0021312402,0.0022709998,0.02488654,0.0004926698,0.052299194],"study_design_scores_gemma":[0.00010600953,0.0016462202,0.82396865,0.0011451988,0.0012803229,0.0004183994,0.1346009,0.012012309,0.0042038746,0.01220786,0.008320287,0.0000900419],"about_ca_topic_score_codex":0.006420125,"about_ca_topic_score_gemma":0.0059757144,"teacher_disagreement_score":0.007984104,"about_ca_system_score_codex":0.0020149518,"about_ca_system_score_gemma":0.004660418,"threshold_uncertainty_score":0.026709497},"labels":[],"label_agreement":null},{"id":"W7114766204","doi":"10.5267/j.jpm.2025.12.001","title":"Delay causes of the site-clearance process for public infrastructure projects in Vietnam: Differences across roles and project sizes","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Viet Nam National University Ho Chi Minh City; Ho Chi Minh City University of Technology and Education","keywords":"Staffing; Project management; Stakeholder; Process (computing); Scale (ratio); Public infrastructure; Prioritization; Project stakeholder; Variance (accounting); Integrated project delivery","score_opus":0.06699597420507739,"score_gpt":0.3846937658486076,"score_spread":0.3176977916435302,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114766204","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99764866,0.000046809346,0.00048497092,0.00012923194,0.000003637894,0.000023487573,0.000032067048,0.000004025403,0.0016270307],"genre_scores_gemma":[0.99942255,0.00003586136,0.00018377334,0.000010786784,9.146085e-7,0.000012627347,0.000018700686,0.0000027323351,0.0003121508],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99606663,0.0016070516,0.00027440523,0.00040669533,0.00094479416,0.0007004374],"domain_scores_gemma":[0.9829911,0.00757378,0.005301802,0.00048487933,0.0023183203,0.0013301737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040793624,0.00019128734,0.00016070082,0.0005652838,0.0013972883,0.0015623829,0.0005076634,0.00025935427,0.0022378997],"category_scores_gemma":[0.015038024,0.00029086936,0.00016004387,0.00081499544,0.001269486,0.00143378,0.0015972963,0.0005289438,0.00012280719],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019330833,0.00017108866,0.80691195,0.00030526228,0.000035504876,0.0012697743,0.13830532,0.0016325105,0.00221978,0.0028811747,0.00090777193,0.045166653],"study_design_scores_gemma":[0.0000067948413,0.0002580431,0.7888717,0.00012174883,0.000015479942,0.00027858463,0.19985479,0.0016253124,0.00071392447,0.0007232768,0.0074988627,0.000031413696],"about_ca_topic_score_codex":0.033911165,"about_ca_topic_score_gemma":0.05279816,"teacher_disagreement_score":0.033911165,"about_ca_system_score_codex":0.0043520224,"about_ca_system_score_gemma":0.0053403853,"threshold_uncertainty_score":0.067427576},"labels":[],"label_agreement":null},{"id":"W7114772642","doi":"10.5267/j.jpm.2025.9.005","title":"The influence of project leadership style, innovative work behavior, and openness to experience on employee performance","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Organizational and Employee Performance","field":"Computer Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Structural equation modeling; Likert scale; Openness to experience; Sample (material); Transformational leadership; Variance (accounting); Snowball sampling; Scale (ratio); Reliability (semiconductor); Work (physics)","score_opus":0.04003704671312612,"score_gpt":0.30046096867561656,"score_spread":0.2604239219624904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114772642","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981958,0.00006678733,0.00028406296,0.000033788507,0.0000036019153,0.000007768845,0.000017456696,0.0000042799015,0.0013864741],"genre_scores_gemma":[0.9996106,0.00002679029,0.00013471242,0.000008095922,0.000006472347,0.000006526047,0.000019934254,0.0000017997979,0.00018510652],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99752754,0.0011149431,0.00017958455,0.00019379277,0.00059486856,0.00038937587],"domain_scores_gemma":[0.9610288,0.023318013,0.0068465616,0.0013348168,0.001929109,0.005542685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038077575,0.0002472661,0.0001740446,0.000579014,0.00031888392,0.0011154595,0.0001926034,0.00028949187,0.0017371171],"category_scores_gemma":[0.015596088,0.00010506146,0.0003236712,0.00040321433,0.0005007121,0.00045789193,0.00088414666,0.00047155312,0.00025440974],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021400518,0.00049354637,0.97164255,0.000041347488,0.00008662041,0.00010683705,0.0010273957,0.0004350722,0.0013039488,0.00009974542,0.00010134237,0.024447568],"study_design_scores_gemma":[0.0000035716334,0.0003617428,0.9980704,0.000012261959,0.000015443597,0.000060451097,0.00057392917,0.00040769737,0.00026934483,0.00008080315,0.00013763325,0.000006587847],"about_ca_topic_score_codex":0.0005210457,"about_ca_topic_score_gemma":0.00085887074,"teacher_disagreement_score":0.0038077575,"about_ca_system_score_codex":0.00022445233,"about_ca_system_score_gemma":0.0005747739,"threshold_uncertainty_score":0.020137548},"labels":[],"label_agreement":null},{"id":"W7114774502","doi":"10.5267/j.jpm.2025.9.007","title":"Digitalization of government and enhancement of community participation in development in North Sumatra province","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"E-Government and Public Services","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bureaucracy; Government (linguistics); Thematic analysis; Public participation; Context (archaeology); Qualitative research; Population; Public policy","score_opus":0.026321229378506724,"score_gpt":0.3259521680986511,"score_spread":0.29963093872014435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114774502","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9943901,0.000100717414,0.00008203314,0.00020915737,0.0000024616854,0.000009738828,0.000020688636,0.0000017893914,0.005183337],"genre_scores_gemma":[0.9992337,0.00009762483,0.0000709073,0.000010261984,7.4149796e-7,0.000007470703,0.0000130908265,6.4238293e-7,0.00056559173],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99939,0.00022688044,0.000026423675,0.00006236868,0.0000931142,0.00020108123],"domain_scores_gemma":[0.99900913,0.00034001126,0.0002580187,0.000042523803,0.000116009585,0.00023419475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005342494,0.00015368105,0.00016686379,0.0008249863,0.0015946765,0.0014491293,0.00037479616,0.00020139475,0.0022827662],"category_scores_gemma":[0.0013204959,0.0001328552,0.0001232269,0.0015597964,0.0015751992,0.00076890126,0.0025629532,0.0004969493,0.00011354578],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002272222,0.00043082697,0.5433042,0.0005803706,0.000044055123,0.0057603563,0.3162252,0.0011197813,0.005539945,0.012214473,0.0012578391,0.1132958],"study_design_scores_gemma":[0.000010522813,0.00006105574,0.7038245,0.00015581198,0.000023576285,0.0005476841,0.27950493,0.0005177922,0.00047608156,0.0011063259,0.013754732,0.000017019593],"about_ca_topic_score_codex":0.06386773,"about_ca_topic_score_gemma":0.15332326,"teacher_disagreement_score":0.06386773,"about_ca_system_score_codex":0.004445365,"about_ca_system_score_gemma":0.00424798,"threshold_uncertainty_score":0.12699199},"labels":[],"label_agreement":null},{"id":"W7114775904","doi":"10.5267/j.jpm.2025.11.003","title":"Route optimization for open-close multiple travelling salesman problem with load-balancing constraint: A multi-chromosome based genetic algorithm","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Travelling salesman problem; Crossover; 2-opt; Genetic algorithm; Benchmark (surveying); Bottleneck traveling salesman problem; Combinatorial optimization; Nearest neighbour algorithm; Lin–Kernighan heuristic","score_opus":0.01920267751821153,"score_gpt":0.28319407971233257,"score_spread":0.26399140219412104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114775904","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057143737,0.00091881526,0.9317484,0.00046779402,0.00010528318,0.00015967575,0.00013041355,0.000514361,0.008811559],"genre_scores_gemma":[0.5054086,0.0007862482,0.4851207,0.00025349596,0.00006862505,0.00037564788,0.00047711062,0.00014392215,0.0073656454],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996793,0.000095209194,0.0000114919085,0.00008210018,0.000071830385,0.0000600801],"domain_scores_gemma":[0.9996954,0.00014808083,0.000051053787,0.00001692668,0.000056895005,0.000031689015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058939867,0.00089003803,0.0009237618,0.00089402596,0.00045440643,0.0010729593,0.0014522811,0.0014125697,0.0029792022],"category_scores_gemma":[0.0012568437,0.00037484762,0.0008434694,0.0009976038,0.00045334102,0.00071462704,0.0008048119,0.00095489086,0.00036008543],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004332861,0.000070351765,0.00074989826,0.00006823299,0.000039417533,0.0001003181,0.00005995674,0.9415194,0.0010678734,0.006805165,0.0016890639,0.047787093],"study_design_scores_gemma":[0.000015131835,0.000035262485,0.00012104966,0.000010143941,0.000012082965,0.000031611646,0.000025004489,0.9966738,0.00018582298,0.0020715545,0.0008138264,0.000004765518],"about_ca_topic_score_codex":0.008211045,"about_ca_topic_score_gemma":0.00589404,"teacher_disagreement_score":0.008211045,"about_ca_system_score_codex":0.0007979323,"about_ca_system_score_gemma":0.0016575065,"threshold_uncertainty_score":0.016326487},"labels":[],"label_agreement":null},{"id":"W7114785957","doi":"10.5267/j.jpm.2025.9.010","title":"A systematic review of managing sustainable construction projects: Insights from education, innovation, and governance","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Corporate governance; Sustainability; Sustainable development; Scopus; Construction management; Experiential learning","score_opus":0.021372079527547785,"score_gpt":0.33485526840694807,"score_spread":0.3134831888794003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114785957","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037696632,0.9904094,0.0012820814,0.0013997072,0.0002576797,0.0009341419,0.00062852824,0.000014104698,0.0013047338],"genre_scores_gemma":[0.03211121,0.96029794,0.0044947383,0.00075488834,0.00010151233,0.0014832248,0.00045391393,0.00000947948,0.00029299734],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9731364,0.012239859,0.00823747,0.001012332,0.0048250384,0.0005489305],"domain_scores_gemma":[0.91933054,0.05523173,0.010313436,0.0019784467,0.012161031,0.0009848026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02376417,0.0014165532,0.0045385784,0.030380534,0.0012597356,0.003899291,0.0015710449,0.0020240904,0.0020753024],"category_scores_gemma":[0.092994094,0.00085770944,0.0044063274,0.026806066,0.0013035366,0.003993084,0.0024637594,0.0012599779,0.0002611948],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011061217,0.00004033918,0.0016463321,0.8499587,0.003373153,0.00036705745,0.0017932645,0.00031684287,0.00041925473,0.0018792463,0.004035145,0.13606004],"study_design_scores_gemma":[0.00005631794,0.00015289005,0.0042798044,0.9285473,0.010763881,0.00044959132,0.0019461771,0.00014249506,0.0002793536,0.0012093284,0.052127864,0.000045102974],"about_ca_topic_score_codex":0.008244854,"about_ca_topic_score_gemma":0.036526717,"teacher_disagreement_score":0.030380534,"about_ca_system_score_codex":0.0049540936,"about_ca_system_score_gemma":0.039076254,"threshold_uncertainty_score":0.12567848},"labels":[],"label_agreement":null},{"id":"W7114790254","doi":"10.5267/j.jpm.2025.10.006","title":"Determinants of intention to use e-commerce in Saudi Arabia","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Technology Adoption and User Behaviour","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Majmaah University","keywords":"Structural equation modeling; Variance (accounting); Purchasing; Government (linguistics); Test (biology); Explanatory model; Computer-assisted web interviewing; Data collection","score_opus":0.12389956927019005,"score_gpt":0.42683658644670874,"score_spread":0.30293701717651866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114790254","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99905735,0.000071423296,0.000045022145,0.00007115834,0.000001893324,0.0000032789387,0.000024480662,0.0000010433079,0.00072428834],"genre_scores_gemma":[0.99970716,0.00005926469,0.000040198593,0.000013022351,0.0000015764432,0.0000014259388,0.00002438247,4.591169e-7,0.00015259928],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99977046,0.000055543693,0.000029970719,0.00001792855,0.00006608305,0.00006016052],"domain_scores_gemma":[0.99785334,0.0005770762,0.0007187969,0.00006415781,0.00048206525,0.00030439202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005253993,0.00014621865,0.00013265102,0.0004293218,0.00025375906,0.0008843135,0.0001245829,0.00025190559,0.002139355],"category_scores_gemma":[0.0023837914,0.000086127206,0.00022415441,0.00036113546,0.0002178566,0.00029105577,0.00029744304,0.0003909533,0.00025397303],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049141447,0.00012796368,0.9905872,0.000023178223,0.000025237778,0.000077983896,0.0013639986,0.00009425836,0.000321121,0.00018439796,0.00010096421,0.0070446036],"study_design_scores_gemma":[0.000003614886,0.00006467667,0.9950121,0.000025008048,0.000017057715,0.00007421302,0.0034780472,0.00065788854,0.00011962894,0.00005072296,0.00049184187,0.0000051210886],"about_ca_topic_score_codex":0.018543903,"about_ca_topic_score_gemma":0.015390915,"teacher_disagreement_score":0.018543903,"about_ca_system_score_codex":0.0003704906,"about_ca_system_score_gemma":0.0005156039,"threshold_uncertainty_score":0.03687191},"labels":[],"label_agreement":null},{"id":"W7114791029","doi":"10.5267/j.jpm.2025.9.009","title":"Do political connections and Environmental, Social, and Governance (ESG) performance affect the relationship between climate change risk and audit efforts?","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Corporate Social Responsibility Reporting","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Majmaah University","keywords":"Corporate governance; Audit; Climate change; Politics; Climate risk; Scarcity; Robustness (evolution); Stock exchange; Stock (firearms)","score_opus":0.05373165287862378,"score_gpt":0.3022907621623392,"score_spread":0.2485591092837154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114791029","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99680305,0.00010420991,0.00016592315,0.00040319824,0.000006121836,0.0000087534845,0.000073862,0.0000018409717,0.00243303],"genre_scores_gemma":[0.99961424,0.00005561144,0.000044671408,0.000026288053,0.0000056471868,0.0000023889309,0.00004243116,6.47853e-7,0.00020809083],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99838257,0.000629177,0.0001465864,0.00016249016,0.0003642387,0.00031492935],"domain_scores_gemma":[0.97495985,0.006629735,0.014301693,0.0009120368,0.0013254146,0.0018712175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019755983,0.00011971268,0.00018711801,0.00073321856,0.00049444084,0.0017951902,0.00021737567,0.0004843652,0.0034586277],"category_scores_gemma":[0.013190222,0.00011849654,0.00023108129,0.0010314584,0.0008366605,0.001113976,0.0011785064,0.00067768944,0.00030567835],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032868076,0.00006289579,0.99416816,0.000014668649,0.00003410267,0.000046763405,0.0006518837,0.0001510263,0.000094944,0.00036290858,0.00011640839,0.0042634243],"study_design_scores_gemma":[0.0000017327578,0.000029948182,0.99650276,0.000013082069,0.000013946284,0.00002107612,0.0022232106,0.00032387587,0.00008084105,0.00028224505,0.00050290406,0.0000043534446],"about_ca_topic_score_codex":0.0075432025,"about_ca_topic_score_gemma":0.01603479,"teacher_disagreement_score":0.0075432025,"about_ca_system_score_codex":0.0008143585,"about_ca_system_score_gemma":0.0010492397,"threshold_uncertainty_score":0.014998615},"labels":[],"label_agreement":null},{"id":"W7114801950","doi":"10.5267/j.jpm.2025.11.004","title":"Integrating technology, collaboration, and sustainability in supply chains and project management: A comprehensive review of efficiency, resilience, and strategic alignment","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Sustainable Supply Chain Management","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Supply chain; Supply chain management; Sustainability; Stakeholder; Corporate governance; Resource (disambiguation); Resource efficiency; Sustainable development","score_opus":0.00894898386124064,"score_gpt":0.2814652241197699,"score_spread":0.2725162402585292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114801950","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00073236827,0.9946911,0.0011138039,0.0013360542,0.00015018409,0.000008007286,0.0000071925406,0.0000041612348,0.001956982],"genre_scores_gemma":[0.011765289,0.98624253,0.0011049277,0.00038275556,0.00018574657,0.000014877115,0.00001344443,0.0000039746924,0.00028640273],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99719477,0.0012968162,0.0004314498,0.00025300912,0.00067295966,0.00015098011],"domain_scores_gemma":[0.9844797,0.012780209,0.0011422695,0.00020634857,0.0011845438,0.00020697255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00496842,0.00085321715,0.0011019727,0.007604516,0.0010464117,0.0040259757,0.0006372043,0.0020311563,0.0018112495],"category_scores_gemma":[0.006331843,0.0005665767,0.00087718153,0.01035798,0.00233775,0.006549964,0.0017345448,0.0018100163,0.0003120691],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047444155,0.000087759974,0.001704088,0.039981622,0.00030108026,0.00015563284,0.0019205237,0.0025441654,0.00054255186,0.07715245,0.0063446197,0.86921805],"study_design_scores_gemma":[0.000016369142,0.0002894474,0.008088007,0.09662414,0.00074429216,0.0009430834,0.004721478,0.0018971848,0.0011005444,0.066409215,0.81902725,0.00013892529],"about_ca_topic_score_codex":0.006152295,"about_ca_topic_score_gemma":0.011696113,"teacher_disagreement_score":0.007604516,"about_ca_system_score_codex":0.0029970477,"about_ca_system_score_gemma":0.0073463446,"threshold_uncertainty_score":0.026275814},"labels":[],"label_agreement":null},{"id":"W7114803533","doi":"10.5267/j.jpm.2025.9.001","title":"U–CARE–PM: A real-time gating framework for catastrophic risk in critical utility projects","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Downtime; Resilience (materials science); IT service continuity; Schedule; Critical infrastructure; Risk management; Delphi method; Resource (disambiguation); Continuous monitoring; Implementation","score_opus":0.013477360230063875,"score_gpt":0.3217769156772252,"score_spread":0.30829955544716137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114803533","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02687764,0.00034228538,0.9364031,0.004020538,0.0001550822,0.0013682833,0.0010751778,0.0054993457,0.024258578],"genre_scores_gemma":[0.2945087,0.00019630592,0.69965017,0.00051113614,0.000056707115,0.0013621985,0.0009369743,0.0004410763,0.0023367642],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9852426,0.0102534825,0.00087604043,0.0015588739,0.0014167845,0.00065216445],"domain_scores_gemma":[0.98188144,0.011077618,0.0017733318,0.0022917932,0.001822831,0.0011530352],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022758657,0.0011988276,0.0005286172,0.004526066,0.0015357907,0.0051767947,0.002910891,0.0016032715,0.005239953],"category_scores_gemma":[0.031452,0.0007047111,0.0011094174,0.002348825,0.0035131506,0.007400264,0.0065388777,0.001943051,0.00097510515],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038485494,0.0004961762,0.017158454,0.0012325862,0.00012752062,0.00060628314,0.019181695,0.06130401,0.0044013057,0.6062064,0.027675517,0.26122513],"study_design_scores_gemma":[0.00019867245,0.0009963762,0.013554515,0.0019201706,0.0001300784,0.0008269734,0.015545649,0.26613238,0.004838031,0.3071064,0.3883897,0.00036102152],"about_ca_topic_score_codex":0.008393798,"about_ca_topic_score_gemma":0.010528415,"teacher_disagreement_score":0.022758657,"about_ca_system_score_codex":0.0031631677,"about_ca_system_score_gemma":0.0069537982,"threshold_uncertainty_score":0.12036073},"labels":[],"label_agreement":null},{"id":"W7114809687","doi":"10.5267/j.jpm.2025.10.003","title":"Enhancing project financial performance prediction: An explainable machine learning framework integrating frontier efficiency and super learner","year":2025,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"Efficiency Analysis Using DEA","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Prince Sattam bin Abdulaziz University","keywords":"Categorical variable; Data envelopment analysis; Leverage (statistics); Weighting; Robustness (evolution); Random forest; Estimator; Boosting (machine learning); Gradient boosting; Support vector machine","score_opus":0.030007837134242578,"score_gpt":0.3436947384547502,"score_spread":0.3136869013205076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114809687","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.116615236,0.00041921722,0.8790533,0.00063591887,0.000021402342,0.000037120033,0.00011970261,0.00028568698,0.002812471],"genre_scores_gemma":[0.9400976,0.00021952153,0.058368277,0.000091621616,0.00004448318,0.00005601011,0.00015138445,0.000027012362,0.0009441999],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991585,0.0004158997,0.00003658673,0.00015008987,0.00014913008,0.000089796],"domain_scores_gemma":[0.9972363,0.0016941627,0.0003769976,0.00020091444,0.0004107709,0.00008091267],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003879124,0.0007386463,0.0009483398,0.0012776052,0.00033141667,0.001204311,0.0011940241,0.0008985598,0.0009925815],"category_scores_gemma":[0.00633503,0.0003082193,0.00067665265,0.00076504983,0.00079537625,0.0019326314,0.0012391832,0.0010822276,0.00021594037],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004528449,0.0000695716,0.009568878,0.000042408952,0.00008587784,0.000088168534,0.000100456054,0.9264152,0.0006836235,0.019980809,0.00046269118,0.042457078],"study_design_scores_gemma":[0.000002347509,0.00002057414,0.0006804862,0.000006821411,0.00000895725,0.000009337136,0.00001164867,0.9910129,0.00021054219,0.007818664,0.00021276694,0.000004850783],"about_ca_topic_score_codex":0.0029718773,"about_ca_topic_score_gemma":0.002563875,"teacher_disagreement_score":0.003879124,"about_ca_system_score_codex":0.00083564705,"about_ca_system_score_gemma":0.0010610183,"threshold_uncertainty_score":0.020515025},"labels":[],"label_agreement":null}]}