{"meta":{"query_hash":"5dd7fed24106","filters":{"venue":"Journal of Ship Production"},"cohort_total":4,"direct_labels_cover":0,"predictions_cover":4,"exported":4,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/5dd7fed24106","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Ship+Production"},"results":[{"id":"W133259137","doi":"10.5957/jsp.2008.24.1.1","title":"A Linear Programming Approach to Optimization of Ship Design and Construction Phases","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Shipbuilding; Schedule; Engineering; Duration (music); Linear programming; Operations research; Construction management; Design–build; Naval architecture; Computer science; Mathematical optimization; Civil engineering; Mathematics; Marine engineering","score_opus":0.03528924747972239,"score_gpt":0.23038810141038774,"score_spread":0.19509885393066534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W133259137","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074879546,0.0002483011,0.98310757,0.0002104392,0.0000360412,0.00016456824,0.00020990786,0.00017338806,0.008361893],"genre_scores_gemma":[0.28898343,0.0013941787,0.6872541,0.00025320615,0.000118503594,0.0022702904,0.0006312518,0.00029336326,0.01880167],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989241,0.0005460109,0.00003774862,0.00013755994,0.00022239011,0.00013208587],"domain_scores_gemma":[0.99889475,0.00087173004,0.00007581135,0.000022677114,0.00011022832,0.000024800745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020370435,0.0021326442,0.0016062427,0.0013479936,0.0006680851,0.001985322,0.0016325332,0.0015360328,0.008402983],"category_scores_gemma":[0.0026389896,0.0016158181,0.0019818998,0.002122545,0.00080745167,0.001072693,0.00087655574,0.0024802089,0.0009149174],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008907947,0.000021265028,0.000053401935,0.000032649146,0.000010811231,0.000013281274,0.000009939959,0.99319035,0.00013926816,0.0026556244,0.0001811545,0.0036832858],"study_design_scores_gemma":[0.000009249888,0.000036049067,0.000050739054,0.0000088275165,0.000008148507,0.000006472716,0.000012877543,0.99574465,0.00018598858,0.0032196392,0.00071163196,0.000005772274],"about_ca_topic_score_codex":0.017468065,"about_ca_topic_score_gemma":0.017184794,"teacher_disagreement_score":0.017468065,"about_ca_system_score_codex":0.0022409717,"about_ca_system_score_gemma":0.0034731722,"threshold_uncertainty_score":0.03473276},"labels":[],"label_agreement":null},{"id":"W303161768","doi":"10.5957/jsp.2008.24.4.221","title":"A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipbuilding; Shipyard; Vendor; Naval architecture; Piping; Manufacturing engineering; Productivity; Engineering; Process (computing); Operations research; Computer science; Engineering drawing; Marine engineering; Mechanical engineering","score_opus":0.03919690532133227,"score_gpt":0.22074021172357128,"score_spread":0.181543306402239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W303161768","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20094994,0.00030876245,0.7521431,0.0005570457,0.00007418348,0.00028533483,0.00024139833,0.0021980817,0.04324219],"genre_scores_gemma":[0.71004397,0.00053264713,0.2816357,0.000054908865,0.000013600868,0.00052265724,0.00026773158,0.00014412083,0.0067846063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995136,0.00024084885,0.00001729898,0.00004937024,0.00013170083,0.000047241097],"domain_scores_gemma":[0.9990256,0.00055737206,0.000052372274,0.00009412134,0.00022461894,0.00004594081],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067191274,0.00059339305,0.00051490066,0.0008262974,0.0005879864,0.0011834403,0.00096170156,0.00069330964,0.0039627426],"category_scores_gemma":[0.0026237085,0.00049258576,0.00046412568,0.0011235381,0.00047848333,0.00071196345,0.00066439004,0.00071586727,0.00030036655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007509335,0.00006436153,0.0008799121,0.000028503768,0.000015306869,0.000030733627,0.00008500066,0.9711623,0.0013995721,0.0075816824,0.0003684768,0.018309051],"study_design_scores_gemma":[0.00001299573,0.000025407036,0.00014522215,0.000006125987,0.0000084648245,0.000008115769,0.00002220418,0.99676573,0.0006138309,0.0009485871,0.001439137,0.000004229683],"about_ca_topic_score_codex":0.030318746,"about_ca_topic_score_gemma":0.023819882,"teacher_disagreement_score":0.030318746,"about_ca_system_score_codex":0.0018541683,"about_ca_system_score_gemma":0.0032634854,"threshold_uncertainty_score":0.060284495},"labels":[],"label_agreement":null},{"id":"W45633412","doi":"10.5957/jsp.2008.24.4.214","title":"Major Factors Affecting Tugboat Ship Design and Construction","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"Marine and Offshore Engineering Studies","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipyard; Shipbuilding; Vendor; Rework; Engineering; Naval architecture; Manufacturing engineering; Operations research; Operations management; Marine engineering; Business","score_opus":0.023223987406302733,"score_gpt":0.2083710768661037,"score_spread":0.18514708945980096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W45633412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9842794,0.0006614439,0.0031272767,0.00010285982,0.000014971261,0.00012513521,0.00017822892,0.000039544884,0.011471199],"genre_scores_gemma":[0.9871502,0.00068765285,0.003783236,0.00001866789,0.0000069719827,0.000068867004,0.00035535978,0.000034124005,0.0078949975],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978551,0.0004404267,0.00013125288,0.00020806128,0.00084945,0.00051567506],"domain_scores_gemma":[0.9966911,0.0010753633,0.0007883598,0.00016095834,0.0009836499,0.0003005512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012378207,0.0006759514,0.0004512519,0.0026483336,0.0017396765,0.0024765967,0.0006149647,0.0004337665,0.004231065],"category_scores_gemma":[0.0068317414,0.00064334186,0.00043019443,0.0051273643,0.001185312,0.0005941576,0.00093317596,0.0005477875,0.00062229607],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00061688886,0.00030686034,0.72860515,0.0004984808,0.00009722412,0.0024375368,0.004533576,0.03022639,0.0200556,0.003275138,0.0023205788,0.20702662],"study_design_scores_gemma":[0.000009710751,0.00023253122,0.9740123,0.00006347067,0.00004369611,0.00049358536,0.005666366,0.004689532,0.0024943855,0.00040084292,0.011848297,0.000045249617],"about_ca_topic_score_codex":0.08577942,"about_ca_topic_score_gemma":0.218147,"teacher_disagreement_score":0.08577942,"about_ca_system_score_codex":0.006572081,"about_ca_system_score_gemma":0.0041921036,"threshold_uncertainty_score":0.1705603},"labels":[],"label_agreement":null},{"id":"W62400544","doi":"10.5957/jsp.2005.21.3.186","title":"Factors Affecting Ship Design and Construction Lead Time and Cost","year":2005,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Context (archaeology); Lead time; Engineering; Quality (philosophy); Naval architecture; Shipbuilding; Process (computing); Probabilistic design; Engineering design process; Design process; Systems engineering; Operations research; Manufacturing engineering; Risk analysis (engineering); Transport engineering; Operations management; Computer science; Work in process; Marine engineering; Business","score_opus":0.024514379453608175,"score_gpt":0.22183229509251362,"score_spread":0.19731791563890544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W62400544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9578338,0.0006302409,0.01954022,0.0002798302,0.000032403877,0.00025756063,0.00016599546,0.00012986832,0.021130051],"genre_scores_gemma":[0.98481363,0.00037898356,0.010683679,0.000021610735,0.000010171475,0.000095746786,0.00018025193,0.000081311795,0.0037346059],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99277747,0.0021142578,0.0005170567,0.00033433444,0.0035208978,0.0007360325],"domain_scores_gemma":[0.97061676,0.020932514,0.003405411,0.0008150305,0.0033924095,0.0008378904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004348827,0.00066179235,0.00041129626,0.0024609412,0.0016113388,0.002852179,0.00090682233,0.0007084271,0.0071723373],"category_scores_gemma":[0.02345202,0.00064883963,0.0005846179,0.0022002598,0.0010363943,0.0014191469,0.0010683663,0.0007718487,0.0010061278],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016571776,0.0012690023,0.5120017,0.0015477685,0.00023313164,0.0072712423,0.008660814,0.15870224,0.026701916,0.009812627,0.0031104083,0.26903194],"study_design_scores_gemma":[0.00014560127,0.00258811,0.82852006,0.00041919088,0.0003377253,0.0062333704,0.026203338,0.056329194,0.024868194,0.008298208,0.045637924,0.00041915814],"about_ca_topic_score_codex":0.0072302097,"about_ca_topic_score_gemma":0.016854653,"teacher_disagreement_score":0.0072302097,"about_ca_system_score_codex":0.003373116,"about_ca_system_score_gemma":0.003563672,"threshold_uncertainty_score":0.024473786},"labels":[],"label_agreement":null}]}