{"meta":{"query_hash":"5dd7fed24106","filters":{"venue":"Journal of Ship Production"},"cohort_total":4,"direct_labels_cover":0,"predictions_cover":4,"exported":4,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/5dd7fed24106","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+Ship+Production"},"results":[{"id":"W133259137","doi":"10.5957/jsp.2008.24.1.1","title":"A Linear Programming Approach to Optimization of Ship Design and Construction Phases","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Shipbuilding; Schedule; Engineering; Duration (music); Linear programming; Operations research; Construction management; Design–build; Naval architecture; Computer science; Mathematical optimization; Civil engineering; Mathematics; Marine engineering","score_opus":0.03528924747972239,"score_gpt":0.23038810141038774,"score_spread":0.19509885393066534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W133259137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22185117,0.00027087057,0.7764505,0.00009167321,0.0009278121,0.00021991019,5.3611996e-7,0.000047159017,0.00014034235],"genre_scores_gemma":[0.6274057,0.00014963667,0.37201178,0.0000040072064,0.00038440857,0.000006465339,0.0000016616009,0.000011616257,0.000024729408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991584,0.000043636755,0.00040716308,0.00010802357,0.00018693099,0.00009586509],"domain_scores_gemma":[0.9993633,0.000012772386,0.00017468412,0.00007826315,0.00030872706,0.00006224066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031351796,0.0000999039,0.00016818188,0.00027015782,0.000071799586,0.00001628049,0.000045212466,0.0000686388,0.0000064793194],"category_scores_gemma":[0.0001164232,0.000091612004,0.000041193336,0.00032441225,0.00007607222,0.0004163933,0.000004487327,0.0001558222,5.215184e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018019268,0.000093683266,0.0012041962,0.00011641273,0.000071700146,0.0000015414226,0.0013535187,0.8984179,0.011698709,0.00037366673,0.0005754937,0.08591297],"study_design_scores_gemma":[0.0034627072,0.0024253272,0.004420627,0.00081540056,0.0005129637,0.024143122,0.005719957,0.42907968,0.5203152,0.0015393042,0.0062319264,0.0013338019],"about_ca_topic_score_codex":0.0000020377215,"about_ca_topic_score_gemma":2.2576836e-7,"teacher_disagreement_score":0.50861645,"about_ca_system_score_codex":0.000049204038,"about_ca_system_score_gemma":0.000036171168,"threshold_uncertainty_score":0.37358293},"labels":[],"label_agreement":null},{"id":"W303161768","doi":"10.5957/jsp.2008.24.4.221","title":"A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipbuilding; Shipyard; Vendor; Naval architecture; Piping; Manufacturing engineering; Productivity; Engineering; Process (computing); Operations research; Computer science; Engineering drawing; Marine engineering; Mechanical engineering","score_opus":0.03919690532133227,"score_gpt":0.22074021172357128,"score_spread":0.181543306402239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W303161768","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44375148,0.000076063574,0.55516267,0.00005691355,0.0007485075,0.00013919358,6.09675e-8,0.000038066915,0.000027049844],"genre_scores_gemma":[0.8165571,0.000007802512,0.18259147,0.00000866917,0.00079351984,0.000005560634,5.090809e-7,0.000012675654,0.00002265772],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991491,0.00004688113,0.00032738972,0.00015724475,0.00019961517,0.000119779346],"domain_scores_gemma":[0.99952084,0.000018015362,0.000109536246,0.00008179416,0.00020162639,0.00006816965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005377664,0.00011391938,0.00014467581,0.00022020441,0.00013775151,0.000033929635,0.00004922934,0.000051304898,0.000001730808],"category_scores_gemma":[0.00006312635,0.00010281956,0.000023491202,0.00018898254,0.000024931192,0.0005533508,0.000011091469,0.00019750594,0.0000021783756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049009603,0.000036781174,0.0008874236,0.000060036433,0.00002960651,0.0000011768245,0.0021623624,0.782101,0.015495658,0.000033142478,0.00029318302,0.19885062],"study_design_scores_gemma":[0.0012262845,0.00053698604,0.08080357,0.00029495807,0.00009296785,0.0047766976,0.0006649262,0.61559755,0.28514317,0.00041949662,0.0093053235,0.0011380719],"about_ca_topic_score_codex":8.779168e-7,"about_ca_topic_score_gemma":3.538564e-7,"teacher_disagreement_score":0.37280566,"about_ca_system_score_codex":0.00013714447,"about_ca_system_score_gemma":0.00004836102,"threshold_uncertainty_score":0.419286},"labels":[],"label_agreement":null},{"id":"W45633412","doi":"10.5957/jsp.2008.24.4.214","title":"Major Factors Affecting Tugboat Ship Design and Construction","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"Marine and Offshore Engineering Studies","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipyard; Shipbuilding; Vendor; Rework; Engineering; Naval architecture; Manufacturing engineering; Operations research; Operations management; Marine engineering; Business","score_opus":0.023223987406302733,"score_gpt":0.2083710768661037,"score_spread":0.18514708945980096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W45633412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97814924,0.00070831564,0.018820483,0.000090792826,0.0019471057,0.00008263928,1.9122588e-7,0.000080631784,0.0001206153],"genre_scores_gemma":[0.9894396,0.0004370945,0.009276965,0.000002220904,0.00076495344,9.308589e-7,3.5182632e-7,0.000018563265,0.000059329657],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99939114,0.000025303712,0.0002314506,0.00008689476,0.00013650708,0.00012872151],"domain_scores_gemma":[0.99968565,0.000049767823,0.00007539655,0.000064946435,0.00007682154,0.000047421123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002905709,0.0001198738,0.00017931192,0.0001570503,0.00010446045,0.000014779852,0.0000392577,0.000045024466,0.0000063217867],"category_scores_gemma":[0.00017792947,0.00010262505,0.000042636548,0.00013731344,0.00004659514,0.00027501132,0.00001004732,0.00023886988,0.0000012107475],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003828599,0.00018337392,0.45573863,0.0016873522,0.001712857,0.00020331507,0.022621403,0.30478293,0.108368315,0.00049954257,0.026569502,0.077249914],"study_design_scores_gemma":[0.0014293983,0.0007820466,0.61593777,0.00041105656,0.00033636577,0.008724171,0.0033541925,0.0039959927,0.3587839,0.0011685846,0.003958144,0.0011183571],"about_ca_topic_score_codex":0.0000024912579,"about_ca_topic_score_gemma":8.086472e-7,"teacher_disagreement_score":0.30078694,"about_ca_system_score_codex":0.000055108074,"about_ca_system_score_gemma":0.000010309101,"threshold_uncertainty_score":0.4184928},"labels":[],"label_agreement":null},{"id":"W62400544","doi":"10.5957/jsp.2005.21.3.186","title":"Factors Affecting Ship Design and Construction Lead Time and Cost","year":2005,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Context (archaeology); Lead time; Engineering; Quality (philosophy); Naval architecture; Shipbuilding; Process (computing); Probabilistic design; Engineering design process; Design process; Systems engineering; Operations research; Manufacturing engineering; Risk analysis (engineering); Transport engineering; Operations management; Computer science; Work in process; Marine engineering; Business","score_opus":0.024514379453608175,"score_gpt":0.22183229509251362,"score_spread":0.19731791563890544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W62400544","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9626084,0.0004844217,0.036056988,0.00019546897,0.00042496197,0.000115502415,2.887554e-7,0.000049031878,0.00006495622],"genre_scores_gemma":[0.98531413,0.00021679427,0.01389831,0.000004335337,0.0004905896,6.0599257e-7,8.666628e-7,0.000014192948,0.00006019943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995106,0.000027951442,0.00018837064,0.0000855055,0.000096211304,0.000091364294],"domain_scores_gemma":[0.9997223,0.000029806897,0.00010499498,0.000042160966,0.000056232337,0.000044528653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003754932,0.00009084389,0.000118942284,0.00011776851,0.00006967878,0.00005552916,0.000025124262,0.00005160489,0.000013576832],"category_scores_gemma":[0.00008318051,0.00007740928,0.00001637671,0.000064672815,0.000027015774,0.0005073058,0.0000051946004,0.00016078378,0.0000013373929],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000671466,0.000024513389,0.004002917,0.00023350291,0.00007035644,0.0000014707423,0.0021199114,0.756014,0.0129268905,0.000020215404,0.0005832156,0.22393587],"study_design_scores_gemma":[0.0013988843,0.0004096907,0.0605264,0.00047183322,0.00023930716,0.0013515739,0.0010076753,0.14638846,0.7841705,0.00067325996,0.0025748562,0.0007875715],"about_ca_topic_score_codex":8.101159e-7,"about_ca_topic_score_gemma":7.8048413e-7,"teacher_disagreement_score":0.77124363,"about_ca_system_score_codex":0.000048275986,"about_ca_system_score_gemma":0.000007633642,"threshold_uncertainty_score":0.31566587},"labels":[],"label_agreement":null}]}