{"meta":{"query_hash":"6bf1ef9072b2","filters":{"venue":"Journal of the Indian Roads Congress"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/6bf1ef9072b2","api":"https://metacan.xera.ac/api/v1/cohort?venue=Journal+of+the+Indian+Roads+Congress"},"results":[{"id":"W1543949481","doi":"","title":"DESGIN CONSIDERATIONS FOR DECK SLABS IN RCC BRIDGES.","year":2001,"lang":"en","type":"article","venue":"Journal of the Indian Roads Congress","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deck; Structural engineering; Slab; Punching; Tension (geology); Engineering; Bridge deck; Girder; Bridge (graph theory); Geotechnical engineering; Compression (physics); Materials science; Mechanical engineering","score_opus":0.020076933675686123,"score_gpt":0.24916225567955724,"score_spread":0.2290853220038711,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1543949481","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9968039,0.00023675451,0.0003154277,0.0005598591,0.0017062591,0.00022290512,0.00001067394,0.000022689002,0.0001215403],"genre_scores_gemma":[0.99802506,0.000041260188,0.0014643082,0.00011811388,0.00017381612,0.000007268829,6.7471393e-7,0.000024786943,0.00014469442],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990101,0.000024897849,0.000454636,0.00006993495,0.00018808828,0.00025234523],"domain_scores_gemma":[0.999234,0.00019102321,0.00015817281,0.00020171724,0.00012282812,0.00009221889],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001852502,0.00013765242,0.00023361178,0.0001722605,0.00007235209,0.000081287435,0.0002874444,0.00009073015,0.00007524559],"category_scores_gemma":[0.00022108255,0.00010415235,0.00015743356,0.000150486,0.00005012524,0.0002478402,0.00002363758,0.00030848524,0.0000046092337],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051551353,0.000014373539,0.37726527,0.00032956153,0.00096231175,0.0032602672,0.009469771,0.36067867,0.11130563,0.0029510714,0.05077915,0.08246838],"study_design_scores_gemma":[0.01673207,0.0005734514,0.5000023,0.0017484085,0.0005335025,0.018763613,0.0016326169,0.036156952,0.3730178,0.010767577,0.03759115,0.002480521],"about_ca_topic_score_codex":0.000014606539,"about_ca_topic_score_gemma":0.000057941448,"teacher_disagreement_score":0.32452172,"about_ca_system_score_codex":0.00015434586,"about_ca_system_score_gemma":0.000077680656,"threshold_uncertainty_score":0.42472094},"labels":[],"label_agreement":null},{"id":"W592188273","doi":"","title":"A CRITICAL APPRAISAL OF PAVEMENT MANAGEMENT SYSTEMS","year":2002,"lang":"en","type":"article","venue":"Journal of the Indian Roads Congress","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pavement management; Documentation; China; Engineering; Geography; Business; Transport engineering; Computer science","score_opus":0.008902627644218663,"score_gpt":0.23371564153972277,"score_spread":0.2248130138955041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W592188273","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9602937,0.001956689,0.0014539127,0.00030957247,0.03144638,0.00021328704,0.000009560131,0.00003213791,0.004284773],"genre_scores_gemma":[0.9990026,0.00006332251,0.00030800304,0.00001397308,0.00045629605,0.0000017386398,6.989281e-8,0.000014864625,0.00013912864],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990262,0.00002759386,0.0003963467,0.00004983272,0.00030186493,0.00019817874],"domain_scores_gemma":[0.9994761,0.00006722782,0.000120476725,0.0001801962,0.00009371534,0.00006228673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017352926,0.00010103688,0.0001966951,0.0000969907,0.000038508122,0.000038453036,0.00031961635,0.000046823887,0.00003452564],"category_scores_gemma":[0.000046350844,0.0000665633,0.000111525704,0.00009645857,0.000049975515,0.00010741166,0.000041269097,0.00021305027,0.0000040930163],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001536345,0.00067976763,0.04871275,0.00874849,0.005800352,0.004491451,0.029033085,0.49989685,0.022990584,0.03738351,0.23217589,0.109933645],"study_design_scores_gemma":[0.017309986,0.0020182703,0.10520781,0.024803907,0.0024393417,0.008646305,0.043880735,0.105847105,0.20366035,0.0028531894,0.47869655,0.0046364446],"about_ca_topic_score_codex":0.0000020364648,"about_ca_topic_score_gemma":5.7372444e-7,"teacher_disagreement_score":0.39404973,"about_ca_system_score_codex":0.000060422197,"about_ca_system_score_gemma":0.000004584604,"threshold_uncertainty_score":0.27143726},"labels":[],"label_agreement":null}]}