{"meta":{"query_hash":"6b89c99cb60b","filters":{"venue":"Jurnal Optimasi Sistem Industri"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/6b89c99cb60b","api":"https://metacan.xera.ac/api/v1/cohort?venue=Jurnal+Optimasi+Sistem+Industri"},"results":[{"id":"W2623553367","doi":"10.25077/josi.v13.n1.p486-502.2014","title":"Pengendalian Kualitas Part Trim Rear Quarter Right APV Arena dengan Menggunakan Metode Six Sigma di PT. Suzuki Indomobil Motor","year":2016,"lang":"en","type":"article","venue":"Jurnal Optimasi Sistem Industri","topic":"Management and Optimization Techniques","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Trim; Quarter (Canadian coin); Six Sigma; Quality (philosophy); Product (mathematics); Business; Business administration; Engineering; Automotive engineering; Manufacturing engineering; Mathematics; Physics; Structural engineering","score_opus":0.026236128747134616,"score_gpt":0.23685510300391538,"score_spread":0.21061897425678078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2623553367","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4118002,0.006756038,0.2558273,0.001617651,0.0009176659,0.00076083303,0.0013792282,0.004133425,0.31680766],"genre_scores_gemma":[0.79850334,0.0019388978,0.062125683,0.000093645256,0.000039477647,0.00015407706,0.0008656902,0.00018341531,0.13609585],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99948823,0.00003637999,0.000030989635,0.000081614744,0.00031562557,0.000047131314],"domain_scores_gemma":[0.9997516,0.000027374828,0.00003074628,0.00002931244,0.00013489329,0.000025991878],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029900455,0.00048581968,0.00036321543,0.0008506675,0.0006623053,0.0012793471,0.00054601283,0.0004971457,0.021671534],"category_scores_gemma":[0.00036775554,0.00023699358,0.00032945658,0.000750805,0.0003678935,0.00056136795,0.00054807815,0.00059907435,0.004242137],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085217593,0.00036007154,0.008075256,0.0017453195,0.000038744944,0.0014563065,0.000943315,0.018605402,0.15812331,0.014708463,0.01226454,0.7828271],"study_design_scores_gemma":[0.00016858029,0.002469028,0.044765703,0.0004913821,0.00022958685,0.0041887066,0.0031959706,0.07576811,0.29512486,0.0075774584,0.56581074,0.00020986437],"about_ca_topic_score_codex":0.0025755577,"about_ca_topic_score_gemma":0.0034816153,"teacher_disagreement_score":0.021671534,"about_ca_system_score_codex":0.0005939397,"about_ca_system_score_gemma":0.0011498042,"threshold_uncertainty_score":0.0724985},"labels":[],"label_agreement":null},{"id":"W7117662164","doi":"10.25077/josi.v24.n2.p324-344.2025","title":"Goal Programming and Monte Carlo Simulation for Optimizing Inbound Scheduling in Resource-Constrained Warehouses","year":2025,"lang":"id","type":"article","venue":"Jurnal Optimasi Sistem Industri","topic":"Vehicle Routing Optimization Methods","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Universitas Kristen Petra","keywords":"Scheduling (production processes); Robustness (evolution); Key (lock); Monte Carlo method; Truck; Prioritization; FIFO (computing and electronics); Material handling","score_opus":0.03250396975506274,"score_gpt":0.30685081471271985,"score_spread":0.2743468449576571,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117662164","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10955569,0.00047480204,0.8806642,0.0005395874,0.000075612785,0.00015202035,0.00022432508,0.0004243999,0.007889236],"genre_scores_gemma":[0.83530676,0.00035596252,0.16111064,0.0001504008,0.000032450946,0.0003378072,0.00027481373,0.00009572235,0.0023354199],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939895,0.00035523588,0.00002078583,0.000059464805,0.00008626191,0.00007939169],"domain_scores_gemma":[0.9970804,0.0024132107,0.00018413416,0.000055880373,0.00017714362,0.00008925282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019876389,0.0009779964,0.0010099034,0.0008034211,0.0004429714,0.00134622,0.0010020221,0.0012831563,0.0016472694],"category_scores_gemma":[0.0037715666,0.0006723208,0.0008746022,0.0007978407,0.000819968,0.0005484003,0.0009090872,0.0013291251,0.00017883227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000083179575,0.000008154849,0.00012794185,0.0000071443433,0.0000048087923,0.000005504728,0.000004533112,0.99818414,0.000033010165,0.000981344,0.000033624692,0.0006014402],"study_design_scores_gemma":[0.0000016283443,0.0000027755393,0.000014650306,0.0000012568213,9.565014e-7,5.365169e-7,0.000001906218,0.99952126,0.000021345077,0.00040154168,0.0000314226,6.8406723e-7],"about_ca_topic_score_codex":0.018627113,"about_ca_topic_score_gemma":0.012694665,"teacher_disagreement_score":0.018627113,"about_ca_system_score_codex":0.001302439,"about_ca_system_score_gemma":0.0018758872,"threshold_uncertainty_score":0.037037373},"labels":[],"label_agreement":null}]}