{"meta":{"query_hash":"dad86595a18f","filters":{"venue":"Korean Journal of Construction Engineering and Management"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/dad86595a18f","api":"https://metacan.xera.ac/api/v1/cohort?venue=Korean+Journal+of+Construction+Engineering+and+Management"},"results":[{"id":"W2037172886","doi":"10.6106/kjcem.2014.15.4.107","title":"A Study on Developing the Business Index of Electrical Construction Business","year":2014,"lang":"en","type":"article","venue":"Korean Journal of Construction Engineering and Management","topic":"Advanced Statistical Modeling Techniques","field":"Computer Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Index (typography); Quarter (Canadian coin); Business cycle; Construction industry; Business; Pessimism; Housing industry; Engineering; Computer science; Economics; Construction engineering; Telecommunications; Geography","score_opus":0.01022902370105693,"score_gpt":0.23243182889411892,"score_spread":0.222202805193062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037172886","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033436235,0.00001489344,0.96571326,0.00028433383,0.00030104717,0.00011890016,2.0083685e-7,0.0000467336,0.00008438167],"genre_scores_gemma":[0.68709433,0.00003984893,0.31280848,0.000015346664,0.00003324281,0.000002754925,8.5706795e-8,0.0000045363695,0.0000013779551],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991436,0.000038034137,0.00034276024,0.00012350366,0.00024174208,0.000110354355],"domain_scores_gemma":[0.99924225,0.000089988265,0.00019865682,0.00016789876,0.00026590715,0.00003529856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000361069,0.000102798,0.00017564719,0.00024666887,0.00005667915,0.000042449657,0.00023010973,0.000021395848,2.9740298e-7],"category_scores_gemma":[0.000108186956,0.00007493771,0.000020473348,0.00049259816,0.000054838518,0.00015142762,0.000070362585,0.00012777849,1.5148119e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022189433,0.00003956019,0.00058604794,0.000056403922,0.000074932716,0.000013778292,0.00010879288,0.027246106,0.000064937725,0.6668655,0.000022471937,0.30489925],"study_design_scores_gemma":[0.004573148,0.0014852507,0.31771794,0.0014912505,0.00027591112,0.003347591,0.00085276336,0.53711194,0.0021166443,0.12647097,0.003425693,0.0011309065],"about_ca_topic_score_codex":0.000001508689,"about_ca_topic_score_gemma":1.7697711e-7,"teacher_disagreement_score":0.6536581,"about_ca_system_score_codex":0.000033714743,"about_ca_system_score_gemma":0.000016998229,"threshold_uncertainty_score":0.30558708},"labels":[],"label_agreement":null},{"id":"W2084990428","doi":"10.6106/kjcem.2010.11.6.35","title":"A Study on Asset Valuation Method for Bridge Asset management","year":2010,"lang":"en","type":"article","venue":"Korean Journal of Construction Engineering and Management","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Federal Highway Administration; University of Waterloo; U.S. Department of Transportation","keywords":"Valuation (finance); Cost accounting; Business; Asset management; Actuarial science; Risk analysis (engineering); Finance; Accounting","score_opus":0.01129763864544677,"score_gpt":0.26191861069750844,"score_spread":0.2506209720520617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2084990428","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3019365,0.0000210829,0.69242185,0.000040486673,0.0039029927,0.0005162846,0.000005194812,0.000094226365,0.0010613505],"genre_scores_gemma":[0.85436976,0.000054633718,0.1451233,0.00001087116,0.0003534146,0.000030537947,0.0000026202868,0.000028727503,0.000026133952],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99911916,0.000012567188,0.0003370053,0.00012952377,0.00021159064,0.00019014382],"domain_scores_gemma":[0.9995821,0.00003528639,0.000088526765,0.00014849186,0.000071795104,0.00007380036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005764489,0.00017196388,0.0001992522,0.00035445773,0.00005506591,0.00006200816,0.00010145467,0.000041007686,0.000003302812],"category_scores_gemma":[0.000013761153,0.0001596904,0.000067941444,0.00011150417,0.0000117381605,0.0001272252,0.000021214622,0.00023289604,8.3526805e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001270542,0.00013614738,0.0017352783,0.00085963245,0.0021333538,0.00018350969,0.0008902636,0.3100246,0.005705719,0.07070867,0.003197428,0.60429835],"study_design_scores_gemma":[0.0217915,0.0030900128,0.54185766,0.0014295479,0.0032165798,0.0032718258,0.009892333,0.23769322,0.015822701,0.009992247,0.14886634,0.003076018],"about_ca_topic_score_codex":6.210934e-7,"about_ca_topic_score_gemma":7.681694e-7,"teacher_disagreement_score":0.60122234,"about_ca_system_score_codex":0.00004358949,"about_ca_system_score_gemma":0.000003691685,"threshold_uncertainty_score":0.65119857},"labels":[],"label_agreement":null},{"id":"W2093122234","doi":"10.6106/kjcem.2014.15.2.087","title":"Analysis of Dynamic Relationship between Changes in Domestic and Overseas Orders and Insolvency of Construction Companies","year":2014,"lang":"en","type":"article","venue":"Korean Journal of Construction Engineering and Management","topic":"Technology and Data Analysis","field":"Computer Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Insolvency; Business; Operations management; Accounting; Finance; Engineering; Geography","score_opus":0.006344239165275677,"score_gpt":0.21465145369024483,"score_spread":0.20830721452496914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2093122234","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6488826,0.00013462262,0.35076997,0.00011319106,0.0000426481,0.000026520436,0.000001989807,0.0000093068775,0.000019142395],"genre_scores_gemma":[0.9635909,0.00028903387,0.03610808,0.000002271968,0.0000043892114,5.593775e-7,0.0000017717053,0.0000018790618,0.0000010869854],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99943197,0.00002618273,0.00027405247,0.000104832405,0.000095559335,0.00006738283],"domain_scores_gemma":[0.9994827,0.00010270734,0.00022722296,0.000115955605,0.00003831449,0.00003312789],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029047896,0.000069681424,0.00026565065,0.001259395,0.000026241267,0.000014590387,0.0000854977,0.000036953923,8.3662314e-7],"category_scores_gemma":[0.00004867756,0.00006752259,0.000029195367,0.0006293088,0.00013276626,0.00016739029,0.000055127744,0.00008357104,2.1958412e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012166619,0.00001772377,0.6307214,0.00026793405,0.0010155491,0.000006900004,0.00032177006,0.00794483,0.00010443024,0.25569212,0.000002124193,0.10389309],"study_design_scores_gemma":[0.00047801912,0.00008153198,0.88083345,0.000092250215,0.0006596245,0.00007166491,0.0003403268,0.11485077,0.000023501456,0.0024390314,0.00004455318,0.0000852994],"about_ca_topic_score_codex":0.000010081847,"about_ca_topic_score_gemma":0.000015235337,"teacher_disagreement_score":0.31470832,"about_ca_system_score_codex":0.000011893549,"about_ca_system_score_gemma":0.000004578462,"threshold_uncertainty_score":0.2753491},"labels":[],"label_agreement":null}]}