{"meta":{"query_hash":"4be7dc082780","filters":{"venue":"Mass transit"},"cohort_total":22,"direct_labels_cover":0,"predictions_cover":22,"exported":22,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/4be7dc082780","api":"https://metacan.xera.ac/api/v1/cohort?venue=Mass+transit"},"results":[{"id":"W1598867956","doi":"","title":"RAIL INNOVATIONS 2003","year":2003,"lang":"en","type":"article","venue":"Mass transit","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Monorail; Light rail transit; Transit (satellite); Transport engineering; Light rail; Rail transit; Engineering; Public transport; Joint (building); Telecommunications; Civil engineering","score_opus":0.007572745718745623,"score_gpt":0.17473420481113017,"score_spread":0.16716145909238456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1598867956","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009324163,0.0027376232,0.002486397,0.0036575284,0.0037315204,0.00007552056,0.0016811575,0.002086202,0.98261166],"genre_scores_gemma":[0.00097032514,0.0008068822,0.00029728896,0.00028731395,0.00010189986,0.0000126021605,0.0006929514,0.00011839454,0.9967122],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993488,0.000027974698,0.00002984077,0.000118443124,0.00040051178,0.00007444277],"domain_scores_gemma":[0.9990128,0.000061751336,0.000030225754,0.00011098811,0.00064622675,0.00013793726],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00056951854,0.0006747568,0.0003242256,0.0015019566,0.0011110505,0.003985865,0.00086554873,0.0017868434,0.4861525],"category_scores_gemma":[0.0014772324,0.00043504976,0.00042130353,0.0017126031,0.0003259438,0.0019706646,0.0010002999,0.0016731818,0.4222935],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023277375,0.000033751625,0.00012732252,0.0000724845,0.000002045708,0.00004815619,0.000049543403,0.0001009435,0.00071696454,0.006871726,0.8618691,0.13008472],"study_design_scores_gemma":[0.0000017791737,0.000007307256,0.0001879433,0.000020065034,7.7886625e-7,0.000023559764,0.000015676624,0.000034004737,0.00009561963,0.00018210219,0.9994293,0.0000019134586],"about_ca_topic_score_codex":0.008990734,"about_ca_topic_score_gemma":0.030032102,"teacher_disagreement_score":0.4861525,"about_ca_system_score_codex":0.001898262,"about_ca_system_score_gemma":0.0020893577,"threshold_uncertainty_score":0.7329411},"labels":[],"label_agreement":null},{"id":"W2059030129","doi":"","title":"COMMUTER RAIL UPDATE 2000","year":2000,"lang":"en","type":"article","venue":"Mass transit","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Metropolitan area; Transport engineering; Public transport; Rail transportation; Service (business); Administration (probate law); Business; Light rail transit; Engineering; Geography; Political science; Marketing","score_opus":0.010259767268937446,"score_gpt":0.17702599677103212,"score_spread":0.16676622950209466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2059030129","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062943543,0.01658498,0.0036861573,0.014423933,0.021834096,0.0007705344,0.41501588,0.006727861,0.51466227],"genre_scores_gemma":[0.0118174115,0.010660997,0.003338753,0.00361669,0.00268802,0.0005962882,0.29959625,0.0006983086,0.6669873],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989598,0.00006299746,0.000112076894,0.00010648706,0.0006497636,0.0001089187],"domain_scores_gemma":[0.9946378,0.00043949718,0.00038730545,0.00031940817,0.0037379335,0.00047814008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013929993,0.00078516407,0.00062744843,0.0060429177,0.00060932874,0.0023327344,0.0015384019,0.0015097283,0.1101221],"category_scores_gemma":[0.005796404,0.0003380837,0.00036085327,0.0054902895,0.00014398777,0.0018999017,0.0010625806,0.0013543146,0.07317191],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003632077,0.000028443133,0.0007523848,0.000087296095,0.0000030328056,0.0000123117725,0.00001655413,0.000054615895,0.000031917745,0.00035380232,0.955394,0.04322933],"study_design_scores_gemma":[0.000009444103,0.000010854661,0.0047182078,0.00009137869,0.0000042181778,0.000018849454,0.000019823963,0.000053888503,0.000043481752,0.00006673325,0.9949582,0.0000048285465],"about_ca_topic_score_codex":0.05746745,"about_ca_topic_score_gemma":0.089591525,"teacher_disagreement_score":0.1101221,"about_ca_system_score_codex":0.0014482436,"about_ca_system_score_gemma":0.0024383594,"threshold_uncertainty_score":0.36839515},"labels":[],"label_agreement":null},{"id":"W287183341","doi":"","title":"Implementing Customer Service Training","year":2008,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transit (satellite); Public transport; Customer service; Business; Service (business); Training (meteorology); Upgrade; Transport engineering; Marketing; Operations management; Engineering; Computer science","score_opus":0.054263678095406324,"score_gpt":0.2959724435521982,"score_spread":0.24170876545679187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W287183341","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2744378,0.00090620975,0.064704314,0.027188271,0.0014265227,0.0075327163,0.0005817119,0.0032969995,0.61992556],"genre_scores_gemma":[0.6667935,0.0016494852,0.1311566,0.0104622245,0.00037247044,0.0026596335,0.0011154591,0.00032708168,0.1854635],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9930118,0.0023356236,0.00021083653,0.000509479,0.0019663533,0.0019659556],"domain_scores_gemma":[0.9898218,0.0013148877,0.0003862864,0.00068017276,0.0049006077,0.0028961732],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00617586,0.00041974452,0.00024928956,0.000731142,0.002404535,0.003246394,0.002653529,0.0013105945,0.023617458],"category_scores_gemma":[0.008274114,0.00037053705,0.00034110376,0.00083537557,0.0005411836,0.0013106907,0.0031466659,0.0022129368,0.0052711004],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007145705,0.0040061413,0.008073073,0.00030155433,0.000014613196,0.00010982089,0.0026792523,0.0011601478,0.0017746299,0.005105938,0.07771387,0.89898944],"study_design_scores_gemma":[0.0002256552,0.0040637157,0.091803186,0.0011219347,0.000076224285,0.00057093194,0.01636452,0.0069706608,0.010538873,0.003931811,0.8642157,0.00011687306],"about_ca_topic_score_codex":0.016315145,"about_ca_topic_score_gemma":0.027931312,"teacher_disagreement_score":0.023617458,"about_ca_system_score_codex":0.0038348653,"about_ca_system_score_gemma":0.01993276,"threshold_uncertainty_score":0.07900822},"labels":[],"label_agreement":null},{"id":"W560374752","doi":"","title":"MEET EUROPE'S CUTE PROGRAM","year":2004,"lang":"en","type":"article","venue":"Mass transit","topic":"Vehicle emissions and performance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Public transport; European commission; Transit (satellite); Transport engineering; Urban transit; Test (biology); Engineering; Business; European union; International trade","score_opus":0.007859530119122321,"score_gpt":0.20790161162209328,"score_spread":0.20004208150297095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W560374752","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013469297,0.0017911624,0.0023881174,0.00993492,0.0024583112,0.00065336796,0.01846933,0.001565852,0.9492697],"genre_scores_gemma":[0.043968968,0.0011008078,0.0055788453,0.0040015993,0.0007190593,0.00073052355,0.04065332,0.0007286324,0.9025182],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99882394,0.00013734063,0.000023426872,0.00015624119,0.0005781231,0.00028097574],"domain_scores_gemma":[0.99847835,0.00008409216,0.000060633924,0.000081298575,0.0005724061,0.000723252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017406979,0.0008364254,0.00030411535,0.0018170964,0.001136038,0.002608193,0.000993228,0.001701009,0.20320386],"category_scores_gemma":[0.0019204838,0.0002208667,0.0003636015,0.0007018078,0.0002230907,0.00092559075,0.0023780004,0.0009157285,0.071227975],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002983695,0.00020942285,0.002116902,0.00011820312,0.000010222387,0.00019642337,0.000104609564,0.00019393253,0.0013534238,0.012009868,0.89817595,0.08521259],"study_design_scores_gemma":[0.000026767402,0.000052608935,0.0019261993,0.000014712829,0.0000012873913,0.00008335211,0.00005892978,0.00009877298,0.00028249066,0.00039747625,0.9970541,0.0000032760363],"about_ca_topic_score_codex":0.006382847,"about_ca_topic_score_gemma":0.00966101,"teacher_disagreement_score":0.20320386,"about_ca_system_score_codex":0.0013802424,"about_ca_system_score_gemma":0.0032722747,"threshold_uncertainty_score":0.67978466},"labels":[],"label_agreement":null},{"id":"W568498514","doi":"","title":"LSTAR: A New Way of Moving for Central and South Texas","year":2011,"lang":"en","type":"article","venue":"Mass transit","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Train; Transport engineering; Service (business); Mile; Traffic congestion; Rail transportation; Geography; Engineering; Business; Archaeology; Marketing","score_opus":0.02889384760793355,"score_gpt":0.18005000253646264,"score_spread":0.15115615492852907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W568498514","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030565199,0.0017531172,0.010669947,0.11608089,0.011506043,0.00052004505,0.0016929546,0.0071468744,0.82006484],"genre_scores_gemma":[0.034996405,0.00089005585,0.012334767,0.008472282,0.00092770095,0.0001883922,0.0012126226,0.0006551298,0.94032276],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993573,0.000083856285,0.000032106407,0.00010564055,0.00020616186,0.00021487995],"domain_scores_gemma":[0.99873704,0.00005299114,0.000040179508,0.000093404735,0.00022800219,0.0008484253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009770409,0.00042282516,0.00016171332,0.000821946,0.006817643,0.007159646,0.00087928073,0.002554782,0.16328855],"category_scores_gemma":[0.0012500439,0.00029217007,0.00033523858,0.00079934514,0.0009772745,0.0037484767,0.003951455,0.0031889328,0.035504166],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034254663,0.00006504933,0.0016159656,0.000036603968,0.0000028185332,0.000343681,0.0015677323,0.00008925197,0.00058531837,0.018769415,0.8903172,0.08657274],"study_design_scores_gemma":[0.0000059223044,0.000016916234,0.0010388597,0.000016181239,0.0000012479334,0.000047785357,0.00092586153,0.000060775823,0.00005962834,0.0004410236,0.99737823,0.000007667781],"about_ca_topic_score_codex":0.027254995,"about_ca_topic_score_gemma":0.07884367,"teacher_disagreement_score":0.16328855,"about_ca_system_score_codex":0.0022093935,"about_ca_system_score_gemma":0.0103080375,"threshold_uncertainty_score":0.54625463},"labels":[],"label_agreement":null},{"id":"W569996643","doi":"","title":"Customer Focus: Keeping Its Customers Happy is the Secret to GO Transit's Success","year":2007,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Public transport; Transit (satellite); Service (business); Work (physics); Commission; Customer service; Business; Focus (optics); Marketing; Telecommunications; Advertising; Transport engineering; Engineering; Finance","score_opus":0.0188909602403692,"score_gpt":0.2925694546320202,"score_spread":0.27367849439165104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W569996643","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11135025,0.007448767,0.010913518,0.22789054,0.0017067072,0.00010113781,0.0004433463,0.00038525648,0.63976055],"genre_scores_gemma":[0.86772734,0.005274126,0.003737013,0.016939493,0.00066848216,0.00006239892,0.00030477115,0.000246796,0.10503977],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987903,0.00018215488,0.000014611013,0.000063768755,0.0005687075,0.00038046323],"domain_scores_gemma":[0.99846506,0.00016220522,0.00011531915,0.00003118174,0.00048603758,0.00074021396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013307463,0.00042532105,0.0003010899,0.000432203,0.0050385776,0.0070482404,0.0005882972,0.0019589337,0.011689126],"category_scores_gemma":[0.0019784812,0.00018293662,0.00017292636,0.0010546282,0.002363758,0.0023488845,0.0023117992,0.0019682401,0.0028175963],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014229855,0.000111648165,0.010436794,0.00030707626,0.000047477537,0.0006056738,0.009382305,0.00087995187,0.0024217365,0.10817028,0.6412627,0.22623208],"study_design_scores_gemma":[0.00002660998,0.00017351487,0.019877128,0.00032293316,0.00006586981,0.00052782486,0.03883002,0.001325399,0.0012367994,0.0231663,0.91435677,0.000090973626],"about_ca_topic_score_codex":0.11976205,"about_ca_topic_score_gemma":0.22474739,"teacher_disagreement_score":0.11976205,"about_ca_system_score_codex":0.0051403157,"about_ca_system_score_gemma":0.009556614,"threshold_uncertainty_score":0.23812991},"labels":[],"label_agreement":null},{"id":"W570868792","doi":"","title":"NEW STARTS FOR LIGHT RAIL","year":2000,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Light rail; Light rail transit; Transport engineering; Service (business); Business; Traffic congestion; Engineering; Public transport; Marketing","score_opus":0.014075843867630328,"score_gpt":0.262942145433473,"score_spread":0.24886630156584266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W570868792","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0073141777,0.047811676,0.015747644,0.24529195,0.035538733,0.00014688305,0.00046852155,0.00089512544,0.64678526],"genre_scores_gemma":[0.06484642,0.033843663,0.01853995,0.058504023,0.0070488118,0.00018167302,0.0005730804,0.0008602636,0.8156022],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99799263,0.0004300552,0.00006066873,0.00031905193,0.0007288379,0.00046880514],"domain_scores_gemma":[0.997964,0.0003742709,0.0000837678,0.00018539064,0.0005242705,0.0008682528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018677694,0.00068163086,0.00041825746,0.0012766983,0.0038882405,0.007363521,0.0010263831,0.0045130714,0.08940521],"category_scores_gemma":[0.0037359898,0.00034827008,0.00070027285,0.001135231,0.003089351,0.010367159,0.0052498016,0.0073277955,0.01865316],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008921137,0.00011237362,0.00064367586,0.0002715719,0.000013352494,0.00034538496,0.0011262778,0.00033374235,0.000605352,0.4120907,0.4577823,0.12658608],"study_design_scores_gemma":[0.0000037679033,0.000019766723,0.00011149336,0.0000955136,0.0000015064334,0.000042941992,0.00035534968,0.000042383093,0.00005200929,0.010810132,0.98845893,0.000006267235],"about_ca_topic_score_codex":0.008559613,"about_ca_topic_score_gemma":0.025162725,"teacher_disagreement_score":0.08940521,"about_ca_system_score_codex":0.0042699412,"about_ca_system_score_gemma":0.005059182,"threshold_uncertainty_score":0.2990902},"labels":[],"label_agreement":null},{"id":"W572366602","doi":"","title":"H1N1: Are You Ready?","year":2009,"lang":"en","type":"article","venue":"Mass transit","topic":"COVID-19 impact on air quality","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Public transport; Transit (satellite); Commission; Business; Product (mathematics); Pandemic; Shut down; Advertising; Engineering; Transport engineering; Coronavirus disease 2019 (COVID-19); Medicine; Finance","score_opus":0.025915924683641074,"score_gpt":0.282528325970089,"score_spread":0.2566124012864479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W572366602","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041592624,0.049962297,0.00143943,0.80635184,0.07116756,0.000106591,0.00040020468,0.0003317195,0.06608112],"genre_scores_gemma":[0.040568642,0.0871541,0.005402629,0.5348935,0.03819959,0.00018646287,0.0008182324,0.00027565824,0.29250124],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988028,0.00034852163,0.00005962928,0.00011531625,0.00041296138,0.00026083676],"domain_scores_gemma":[0.9980129,0.0002257676,0.00014859402,0.000046583064,0.00071066164,0.0008555506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022516889,0.0007164464,0.0005942621,0.00044807655,0.002545007,0.0041361083,0.00089056016,0.005743013,0.044413235],"category_scores_gemma":[0.006716166,0.00026297692,0.0005144,0.00037534768,0.0014940696,0.0074861874,0.0018431979,0.004556496,0.024647688],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047067817,0.0000839398,0.0024474033,0.0003069532,0.0000111952395,0.00029135312,0.00075003965,0.000025067955,0.0003164642,0.0021400747,0.8565139,0.13706654],"study_design_scores_gemma":[0.000011175133,0.00012029901,0.0016140899,0.00055927463,0.000010441741,0.0005377316,0.0051146345,0.00003214725,0.00013169227,0.0026461002,0.9891972,0.000025172387],"about_ca_topic_score_codex":0.005746728,"about_ca_topic_score_gemma":0.012108293,"teacher_disagreement_score":0.044413235,"about_ca_system_score_codex":0.0014384257,"about_ca_system_score_gemma":0.0022285688,"threshold_uncertainty_score":0.1485771},"labels":[],"label_agreement":null},{"id":"W576958285","doi":"","title":"BUS RAPID TRANSIT","year":2001,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bus rapid transit; Metropolitan area; Transport engineering; Transit (satellite); Public transport; Rapid transit; Traffic congestion; Transit system; Rail transit; Business; Telecommunications; Engineering; Geography","score_opus":0.020423000221677853,"score_gpt":0.26630799276699696,"score_spread":0.2458849925453191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W576958285","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008354152,0.0022325465,0.007810608,0.0033107062,0.0011400922,0.0002683129,0.006665429,0.002302459,0.9679156],"genre_scores_gemma":[0.076850824,0.0037428928,0.006381078,0.00069970364,0.000299137,0.00013022967,0.009430725,0.00027204698,0.9021934],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996636,0.000032972002,0.000009916915,0.000051770137,0.00018108264,0.00006066712],"domain_scores_gemma":[0.99969006,0.000014077135,0.000020311983,0.00002717186,0.00018672924,0.00006171057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024601814,0.000520097,0.00017874074,0.00073436287,0.0012577963,0.0014317954,0.00038524283,0.00051733485,0.1585287],"category_scores_gemma":[0.0006667738,0.00016032171,0.00021589795,0.0012779502,0.00015528903,0.0007491637,0.0007910741,0.00053541095,0.053432986],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000118542695,0.00007673966,0.0018252804,0.00023835848,0.000012074462,0.00015927342,0.00012326067,0.0009637306,0.002549087,0.025143174,0.6626525,0.306138],"study_design_scores_gemma":[0.000008728718,0.000046066016,0.0013937637,0.00001958304,0.0000041564717,0.00012836156,0.000049061528,0.00040584477,0.0003676407,0.0007652096,0.996807,0.00000468534],"about_ca_topic_score_codex":0.015996225,"about_ca_topic_score_gemma":0.02466561,"teacher_disagreement_score":0.1585287,"about_ca_system_score_codex":0.00093556277,"about_ca_system_score_gemma":0.0018472405,"threshold_uncertainty_score":0.5303314},"labels":[],"label_agreement":null},{"id":"W585123178","doi":"","title":"Light Rail Update: Light Rail Systems Throughout North America Expand to Accommodate City Growth","year":2011,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Light rail; Rail transit; Light rail transit; Transit (satellite); Public transport; Transport engineering; Bay; Rapid transit; Orange (colour); Engineering; Telecommunications; Geography; Civil engineering","score_opus":0.028068192635367414,"score_gpt":0.2601628531685098,"score_spread":0.23209466053314237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W585123178","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008504584,0.012199881,0.005140063,0.067439616,0.040830094,0.00073361624,0.14231797,0.012073132,0.71076095],"genre_scores_gemma":[0.037157092,0.013295197,0.009937445,0.016015992,0.008671603,0.0006471098,0.10724315,0.0016415896,0.80539083],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99890137,0.00006230377,0.00008113686,0.00009858955,0.0007366802,0.00011993617],"domain_scores_gemma":[0.99121046,0.0005859443,0.00026786322,0.00031713225,0.0070087295,0.00060984027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012930871,0.000684442,0.00048440858,0.0022374666,0.0009612275,0.0026944114,0.0013296544,0.0020224536,0.111029945],"category_scores_gemma":[0.0047709956,0.0003627747,0.00047019604,0.003337578,0.00032346885,0.0026687293,0.0013236816,0.0021614817,0.042765964],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008957032,0.000015908101,0.00042214367,0.000056136603,0.000002241307,0.000013154678,0.00001753869,0.000052828633,0.000055843622,0.00035440197,0.97205305,0.026947776],"study_design_scores_gemma":[0.000006477663,0.000007860198,0.002528345,0.000049204493,0.0000030450026,0.000012699739,0.000029527046,0.000056974986,0.000036628775,0.00009985404,0.99716455,0.0000048522584],"about_ca_topic_score_codex":0.09428818,"about_ca_topic_score_gemma":0.17922123,"teacher_disagreement_score":0.111029945,"about_ca_system_score_codex":0.0023307002,"about_ca_system_score_gemma":0.0061075194,"threshold_uncertainty_score":0.3714322},"labels":[],"label_agreement":null},{"id":"W586080265","doi":"","title":"TRAIN YOUR DRIVERS, TRIM YOUR FUEL BILL","year":2004,"lang":"en","type":"article","venue":"Mass transit","topic":"Vehicle emissions and performance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fuel efficiency; Engineering; Transport engineering; Trim; Fleet management; Diesel fuel; Training (meteorology); Transit (satellite); Automotive engineering; Control (management); Operations management; Public transport; Computer science","score_opus":0.01836476795259981,"score_gpt":0.21787174118169833,"score_spread":0.19950697322909852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W586080265","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016828636,0.0019032061,0.002744968,0.15990704,0.010276754,0.00014363344,0.000497309,0.0015526369,0.8061458],"genre_scores_gemma":[0.03839654,0.0016719057,0.0018461624,0.013954709,0.0010910525,0.00004305721,0.0003213796,0.00013413925,0.94254106],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999713,0.000027572054,0.000007881661,0.000017209222,0.00016931361,0.00006501875],"domain_scores_gemma":[0.9993315,0.000056227665,0.000024959561,0.000027900942,0.00033286432,0.00022659924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030493553,0.00027279626,0.00012532235,0.00045638703,0.0014083481,0.0016156466,0.00034506596,0.0011242406,0.09417066],"category_scores_gemma":[0.0023875637,0.00016174864,0.000104452105,0.00023345818,0.0003006089,0.00081612816,0.00042131153,0.0009590115,0.039156258],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008963202,0.000057245114,0.0012992529,0.0000119300585,9.1233403e-7,0.000031064767,0.00008303102,0.00005351864,0.00020077273,0.0011389818,0.91121334,0.0859011],"study_design_scores_gemma":[0.000005001364,0.000036245143,0.0056476253,0.000030633943,0.000001714829,0.0000769423,0.00050892076,0.00011734057,0.00021362184,0.0004596251,0.992897,0.0000052966284],"about_ca_topic_score_codex":0.02539167,"about_ca_topic_score_gemma":0.08455572,"teacher_disagreement_score":0.09417066,"about_ca_system_score_codex":0.0013567364,"about_ca_system_score_gemma":0.0025633045,"threshold_uncertainty_score":0.31503224},"labels":[],"label_agreement":null},{"id":"W590637993","doi":"","title":"LESSONS FROM CALGARY","year":2001,"lang":"en","type":"article","venue":"Mass transit","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Urban sprawl; Downtown; Transit (satellite); Square (algebra); Traffic congestion; Geography; Public transport; Government (linguistics); Population; Transport engineering; Business; Urban planning; Environmental planning; Engineering; Archaeology; Civil engineering; Sociology; Demography","score_opus":0.0075527583454107865,"score_gpt":0.205969557295603,"score_spread":0.19841679895019224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W590637993","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044730887,0.06016991,0.00082873274,0.41685238,0.007015828,0.00007904817,0.0003579801,0.0001179017,0.46984732],"genre_scores_gemma":[0.43090877,0.077668324,0.0020312702,0.17633401,0.002019453,0.000086028704,0.0004033244,0.00021750935,0.3103313],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984295,0.00025286374,0.00003401958,0.00018316542,0.00031316385,0.0007872782],"domain_scores_gemma":[0.99849534,0.00028882604,0.00005125319,0.00005812446,0.00039671912,0.0007096436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014066248,0.0007111771,0.00048044694,0.00089899614,0.010861089,0.007142731,0.0023817716,0.0046145064,0.023637895],"category_scores_gemma":[0.002768512,0.00029276568,0.00038639404,0.0018868105,0.0059276493,0.0032338675,0.00539783,0.0074788495,0.002498915],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014375566,0.00018021511,0.0071206004,0.00056904857,0.000034062614,0.004712502,0.031698693,0.00087417604,0.00048066024,0.09512383,0.6124382,0.2466244],"study_design_scores_gemma":[0.000025763362,0.000056681158,0.008460987,0.0009420854,0.00001803062,0.00028255946,0.04497485,0.00007762868,0.00023039518,0.011467536,0.9334332,0.000030383711],"about_ca_topic_score_codex":0.74316627,"about_ca_topic_score_gemma":0.8760307,"teacher_disagreement_score":0.25683373,"about_ca_system_score_codex":0.026855646,"about_ca_system_score_gemma":0.028157879,"threshold_uncertainty_score":0.5166925},"labels":[],"label_agreement":null},{"id":"W607221590","doi":"","title":"COMMUTER RAIL UPDATE 2001: NEW STARTS AND EXTENSIONS","year":2001,"lang":"en","type":"article","venue":"Mass transit","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Light rail; Transport engineering; Service (business); Silicon valley; Light rail transit; Rail transportation; Engineering; Geography; Regional science; Telecommunications; Civil engineering; Public transport; Business; Finance","score_opus":0.023892650098525838,"score_gpt":0.19995496638665758,"score_spread":0.17606231628813174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W607221590","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017576326,0.28791037,0.014676777,0.10079705,0.105790205,0.0019515686,0.055789877,0.0076053143,0.4079026],"genre_scores_gemma":[0.05401352,0.3428548,0.02904781,0.039275065,0.032046508,0.001742168,0.10294326,0.0017176062,0.39635932],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99577516,0.00061272574,0.00074276625,0.00032911397,0.002178992,0.00036130418],"domain_scores_gemma":[0.9701132,0.0062256334,0.0025719795,0.0013237699,0.017716642,0.0020486913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008002181,0.00063660037,0.0009907533,0.0077619315,0.00078453997,0.006262135,0.0016253308,0.0029488814,0.021338979],"category_scores_gemma":[0.019906225,0.0005947086,0.00079318095,0.009302016,0.00051037176,0.006276032,0.0022964375,0.0033575357,0.011308949],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013333393,0.0000735718,0.0015534712,0.001425801,0.00002205048,0.00011011895,0.0002265702,0.0005285341,0.00023637104,0.006990551,0.7255591,0.26314053],"study_design_scores_gemma":[0.0000064703163,0.000028939321,0.0017916166,0.00035516356,0.000012630337,0.000028528886,0.000051742023,0.000056514193,0.0000686844,0.00016074357,0.99742895,0.000010037903],"about_ca_topic_score_codex":0.028379016,"about_ca_topic_score_gemma":0.05020791,"teacher_disagreement_score":0.028379016,"about_ca_system_score_codex":0.00317317,"about_ca_system_score_gemma":0.0068260403,"threshold_uncertainty_score":0.07138598},"labels":[],"label_agreement":null},{"id":"W612797586","doi":"","title":"MULTIMODAL RAPID TRANSIT GROWS IN OTTAWA","year":2004,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transit (satellite); Light rail transit; Rail transit; Public transport; Transport engineering; Transit system; Light rail; Bus rapid transit; Rapid transit; Urban transit; Capital city; Capital (architecture); Business; Engineering; Telecommunications; Geography","score_opus":0.013066912571100662,"score_gpt":0.2565614284234157,"score_spread":0.24349451585231507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W612797586","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6695477,0.006134451,0.0013517761,0.019218339,0.00031553404,0.00020418265,0.008931108,0.00044828258,0.2938487],"genre_scores_gemma":[0.90590864,0.0042187213,0.0015934352,0.0008064985,0.000052349766,0.00003972709,0.0025883103,0.00007652406,0.0847159],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989661,0.00005365837,0.00003062632,0.00013694045,0.00032653497,0.00048617716],"domain_scores_gemma":[0.99785453,0.000113853384,0.00014730857,0.00008690153,0.0009312266,0.0008662459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003839678,0.00033563926,0.00028945488,0.001348255,0.0050238403,0.0041208616,0.0010791719,0.0005971959,0.025418138],"category_scores_gemma":[0.0014242363,0.00033825167,0.00041626132,0.003132104,0.001346933,0.0015907382,0.0020815996,0.0009643022,0.0015672819],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00095445046,0.00034222897,0.30409825,0.0011995754,0.00013678438,0.005426162,0.0110326735,0.012202062,0.0068094684,0.090837665,0.24150674,0.325454],"study_design_scores_gemma":[0.00003068292,0.00013967414,0.37476945,0.00033050892,0.000089901674,0.0009528815,0.023586951,0.0040436047,0.0009792721,0.0020521982,0.5929029,0.00012194382],"about_ca_topic_score_codex":0.97554296,"about_ca_topic_score_gemma":0.9931049,"teacher_disagreement_score":0.044008862,"about_ca_system_score_codex":0.044008862,"about_ca_system_score_gemma":0.038500033,"threshold_uncertainty_score":0.31930816},"labels":[],"label_agreement":null},{"id":"W617908778","doi":"","title":"Electric Rail or Electric Bus","year":2007,"lang":"en","type":"article","venue":"Mass transit","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interurban; Public transport; Destinations; Service (business); Rail transit; Transit (satellite); Transport engineering; Engineering; Aeronautics; Telecommunications; Business; Tourism; Archaeology; History; Marketing","score_opus":0.01446965528724729,"score_gpt":0.200880038340712,"score_spread":0.18641038305346472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W617908778","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018766223,0.008189484,0.00043874793,0.0024157846,0.0018470682,0.000022202274,0.0010899096,0.00024519576,0.98387516],"genre_scores_gemma":[0.014730504,0.008227447,0.00027358718,0.0012864008,0.00046022527,0.000008780082,0.0008103199,0.00006955901,0.97413313],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99963427,0.000032609667,0.000016351385,0.000050218856,0.00017991012,0.00008659482],"domain_scores_gemma":[0.999603,0.00003259251,0.000037097958,0.000036058802,0.0001942508,0.000097154996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013626249,0.00047930953,0.00021925465,0.0009898753,0.0015192876,0.0026063668,0.00045598936,0.00071192,0.18977131],"category_scores_gemma":[0.00090731407,0.00011213525,0.000107797125,0.0028195006,0.0005151817,0.0013114137,0.00095661107,0.000620506,0.079826415],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027723483,0.000014906984,0.001019331,0.00029918188,0.0000031702805,0.00017421143,0.0003772093,0.000112418114,0.0003653297,0.028139235,0.7444543,0.22501291],"study_design_scores_gemma":[5.533054e-7,0.000003980928,0.0005013305,0.00003723875,4.8806777e-7,0.000058564114,0.00010035458,0.00000741259,0.000029896508,0.00021988484,0.9990388,0.0000013606789],"about_ca_topic_score_codex":0.077650934,"about_ca_topic_score_gemma":0.19630447,"teacher_disagreement_score":0.18977131,"about_ca_system_score_codex":0.0017826648,"about_ca_system_score_gemma":0.0012344369,"threshold_uncertainty_score":0.63484824},"labels":[],"label_agreement":null},{"id":"W618675684","doi":"","title":"Building the Future Together: Transportation Professionals Across the Globe Work Together Through Association Involvement","year":2008,"lang":"en","type":"article","venue":"Mass transit","topic":"Urban Transport and Accessibility","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Globe; Public transport; Association (psychology); Work (physics); Public relations; Transit (satellite); Transportation industry; Political science; Economic growth; Business; Transport engineering; Engineering; Medicine; Psychology; Economics","score_opus":0.026105386202445895,"score_gpt":0.31442617627607555,"score_spread":0.28832079007362965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W618675684","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54567134,0.0031522308,0.015773386,0.089679934,0.0033442597,0.00048836676,0.00004941166,0.00046140287,0.34137976],"genre_scores_gemma":[0.95640093,0.0018116112,0.0036142254,0.0068665436,0.00038058814,0.0002654706,0.000076963224,0.00009358062,0.03049023],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.97980267,0.014039013,0.0003871317,0.0008305172,0.0014027964,0.0035378977],"domain_scores_gemma":[0.97256416,0.005501368,0.0017857653,0.0011962827,0.0023314718,0.016620846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015091966,0.00078817195,0.00047147696,0.0020138782,0.03157711,0.015915448,0.0020416607,0.0038460111,0.013660125],"category_scores_gemma":[0.019132804,0.00090293604,0.0005907394,0.0018723264,0.010085021,0.014816049,0.02926842,0.00784113,0.002913041],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074873584,0.00059756375,0.019675093,0.00018609651,0.0000478704,0.0020684935,0.8439559,0.00014931215,0.0007328727,0.016498003,0.041307088,0.074706905],"study_design_scores_gemma":[0.00003443371,0.00016491747,0.003840754,0.00022774306,0.000027701819,0.00063122454,0.7711298,0.00021196734,0.00015899228,0.005795625,0.21773693,0.000039937862],"about_ca_topic_score_codex":0.0077862553,"about_ca_topic_score_gemma":0.013030213,"teacher_disagreement_score":0.03157711,"about_ca_system_score_codex":0.0027383324,"about_ca_system_score_gemma":0.013612465,"threshold_uncertainty_score":0.07981491},"labels":[],"label_agreement":null},{"id":"W621982874","doi":"","title":"Inside Man: TransLink's New Top Guy, Ian Jarvis, Has Seen the Agency Grow from Its Infancy to a Pacific Coast Powerhouse","year":2010,"lang":"en","type":"article","venue":"Mass transit","topic":"Urban and Freight Transport Logistics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Agency (philosophy); Transit (satellite); Payment; Revenue; Service (business); Tourism; Business; Public transport; Engineering; Transport engineering; Geography; Marketing; Finance; Sociology; Archaeology","score_opus":0.02256800901322434,"score_gpt":0.19118085758761766,"score_spread":0.16861284857439332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W621982874","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011175823,0.016511168,0.0020972372,0.6605311,0.023906302,0.000050323055,0.00019847315,0.0008074566,0.28472206],"genre_scores_gemma":[0.06830418,0.008443425,0.001175105,0.079797216,0.0020111108,0.000043540695,0.00015476404,0.00088323833,0.8391874],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99760395,0.0005187688,0.000053934236,0.0003673978,0.00082529616,0.00063063845],"domain_scores_gemma":[0.99231875,0.0006718235,0.00024515865,0.00022528392,0.0019295843,0.0046094144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014454046,0.0007690111,0.00040667757,0.00075020886,0.018707419,0.0145141,0.0012374393,0.0036372792,0.04906509],"category_scores_gemma":[0.006946992,0.0006656823,0.0003369496,0.0011605102,0.0050545544,0.008111274,0.0042483876,0.009261081,0.012458146],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015296027,0.000014274336,0.00044403382,0.000039255083,0.0000021904582,0.00036680477,0.0070473305,0.000019751933,0.00012599862,0.0030385253,0.9762381,0.012648515],"study_design_scores_gemma":[0.0000017671227,0.0000061285627,0.00030329416,0.000055086624,0.0000015648571,0.00024106924,0.012770556,0.000022683957,0.000055427732,0.00024111682,0.9862912,0.00000999919],"about_ca_topic_score_codex":0.14710467,"about_ca_topic_score_gemma":0.3720282,"teacher_disagreement_score":0.14710467,"about_ca_system_score_codex":0.007492734,"about_ca_system_score_gemma":0.009382329,"threshold_uncertainty_score":0.29249686},"labels":[],"label_agreement":null},{"id":"W634294833","doi":"","title":"Targeting Markets: Targeting Different Market Segments Makes This Agency's Numbers Grow","year":2007,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transit (satellite); Schedule; Agency (philosophy); Business; Transport engineering; Transit system; Public transport; Transit-oriented development; Rail transit; Shore; Finance; Agricultural economics; Marketing; Engineering; Economics","score_opus":0.010934670793889082,"score_gpt":0.25705225474257415,"score_spread":0.24611758394868508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W634294833","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065845266,0.015680822,0.07920472,0.21360725,0.008001232,0.0012805242,0.0028690891,0.0035333084,0.60997784],"genre_scores_gemma":[0.3544931,0.026057167,0.114845425,0.031281095,0.0071540894,0.0014730198,0.0040227673,0.002061666,0.45861167],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965417,0.0009822922,0.0001342434,0.0005756772,0.0013155596,0.0004505712],"domain_scores_gemma":[0.9884184,0.0024954237,0.0010160948,0.0009766034,0.004573061,0.00252047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006511502,0.0010776469,0.0007172679,0.0026362035,0.0011384494,0.006162298,0.0019344287,0.0040370324,0.042611353],"category_scores_gemma":[0.0067549455,0.0005889205,0.001172077,0.0017862839,0.0009014025,0.007975633,0.0030137857,0.0022268083,0.017324878],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002706345,0.0005439202,0.013770664,0.00029622304,0.000044209075,0.00017036422,0.00056704896,0.00085197715,0.00444484,0.014757016,0.2183327,0.74595046],"study_design_scores_gemma":[0.00011992768,0.0004394653,0.013810315,0.00015998617,0.00007068652,0.0005108545,0.0015091817,0.0044855094,0.0024889286,0.0056126807,0.9707227,0.00006971078],"about_ca_topic_score_codex":0.007156833,"about_ca_topic_score_gemma":0.010072119,"teacher_disagreement_score":0.042611353,"about_ca_system_score_codex":0.0015398542,"about_ca_system_score_gemma":0.0042467844,"threshold_uncertainty_score":0.14254922},"labels":[],"label_agreement":null},{"id":"W655571371","doi":"","title":"SETTING THE STAGE FOR SMART GROWTH","year":2004,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; TRIPS architecture; Traffic congestion; Transit (satellite); Service (business); Public transport; Smart growth; Population; Business; Geography; Engineering; Urban planning; Civil engineering","score_opus":0.016818473710773524,"score_gpt":0.2714590763973192,"score_spread":0.25464060268654565,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W655571371","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037009023,0.009337432,0.03873394,0.6234851,0.003883909,0.00035155955,0.000682093,0.0008155729,0.28570142],"genre_scores_gemma":[0.77044886,0.014023951,0.06998428,0.054871704,0.0015908207,0.00093893893,0.00082730065,0.0005711819,0.08674297],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9967379,0.0009409338,0.00007725188,0.00031013144,0.0007467246,0.0011871638],"domain_scores_gemma":[0.9953994,0.0007183437,0.00019912019,0.000252535,0.0010821425,0.0023483818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050895144,0.00094868365,0.0006450087,0.00090032705,0.0047003548,0.010846817,0.0015468849,0.0053213187,0.018489296],"category_scores_gemma":[0.010558606,0.0003470011,0.0004877339,0.0008559031,0.0057947906,0.011692006,0.0130085405,0.0063144243,0.003832538],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014335486,0.00017642538,0.0031531896,0.00036157784,0.00003256981,0.00031568797,0.0023732155,0.004121997,0.0010114512,0.55251163,0.31583887,0.11995999],"study_design_scores_gemma":[0.000055146862,0.00016626173,0.002801202,0.00057876843,0.000014189059,0.00009009362,0.012509409,0.0051285946,0.0006382228,0.31387058,0.6640865,0.00006107055],"about_ca_topic_score_codex":0.018278139,"about_ca_topic_score_gemma":0.0321623,"teacher_disagreement_score":0.018489296,"about_ca_system_score_codex":0.00756878,"about_ca_system_score_gemma":0.027568942,"threshold_uncertainty_score":0.061852872},"labels":[],"label_agreement":null},{"id":"W759996246","doi":"","title":"Charlottetown Transit System: A Private Motorcoach Company Runs Public Transportation in This Tourist Town","year":2008,"lang":"en","type":"article","venue":"Mass transit","topic":"Transportation and Mobility Innovations","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Paratransit; Public transport; Tourism; Transit (satellite); Transport engineering; General partnership; Service (business); Square (algebra); Agency (philosophy); Population; Business; Engineering; Marketing; Finance; Geography; Sociology; Archaeology","score_opus":0.01950365005978158,"score_gpt":0.1953418678821111,"score_spread":0.17583821782232953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W759996246","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49056336,0.0012796962,0.003677103,0.0024238592,0.0003300356,0.00045463548,0.0009290657,0.00094155193,0.49940068],"genre_scores_gemma":[0.42330188,0.0006071867,0.0028023396,0.00040723666,0.000038092807,0.00010922421,0.0006356238,0.00011242086,0.571986],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99987507,0.0000104317105,0.0000025204565,0.000028549011,0.000038736336,0.00004474396],"domain_scores_gemma":[0.99974114,0.000016373826,0.000015590525,0.000016290076,0.00008641622,0.00012414313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001025583,0.0002525787,0.00010022194,0.00039212703,0.0024922001,0.0014630334,0.00028752547,0.00039107556,0.056347866],"category_scores_gemma":[0.00021342878,0.00019765749,0.00008267845,0.00049324165,0.00053911057,0.0005821463,0.0009978242,0.0004950242,0.0069407085],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007128723,0.0007520074,0.06930945,0.00071908516,0.00003249789,0.0065686377,0.017121682,0.0012140113,0.031566676,0.014051392,0.37418216,0.4837695],"study_design_scores_gemma":[0.0000339,0.000290163,0.05956199,0.000078319325,0.000009731259,0.001986174,0.0070000817,0.00073884317,0.0026633306,0.00014733212,0.92746466,0.000025525933],"about_ca_topic_score_codex":0.114356406,"about_ca_topic_score_gemma":0.3315239,"teacher_disagreement_score":0.8856436,"about_ca_system_score_codex":0.0022317509,"about_ca_system_score_gemma":0.0041153785,"threshold_uncertainty_score":0.22738153},"labels":[],"label_agreement":null},{"id":"W772970414","doi":"","title":"MEMPHIS: SAVING DOWNTOWN WITH RAIL","year":2004,"lang":"en","type":"article","venue":"Mass transit","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Downtown; Memphis; Antique; Public transport; Service (business); Mile; Transport engineering; Quarter (Canadian coin); Engineering; Business; Geography; Archaeology; Marketing","score_opus":0.010341206136285057,"score_gpt":0.17152432437272358,"score_spread":0.16118311823643852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W772970414","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07904062,0.0065993606,0.0012684888,0.03988472,0.0054981275,0.00019411939,0.00273148,0.0011748638,0.8636083],"genre_scores_gemma":[0.065546684,0.0031670402,0.0011810879,0.0036619639,0.0003362058,0.000055301363,0.0011590801,0.00015637199,0.9247363],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99988973,0.000012076295,0.0000032901066,0.000017648003,0.000028906848,0.00004827262],"domain_scores_gemma":[0.9998079,0.000010409604,0.000013784884,0.00001145618,0.00004138951,0.00011504621],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020216565,0.0004902654,0.00006166683,0.00043357527,0.002128106,0.0020846734,0.00041799698,0.00087919063,0.18671608],"category_scores_gemma":[0.0006674124,0.00012843343,0.000110072564,0.0004983601,0.0003623131,0.0017344888,0.0017083357,0.00089509436,0.015886556],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000912829,0.000041546926,0.0041969772,0.00014848051,0.00000521269,0.0006925961,0.001478018,0.000096412485,0.0014086,0.00839317,0.8411349,0.14231293],"study_design_scores_gemma":[0.000003490316,0.000016942695,0.00442388,0.0000691187,0.00000171564,0.000115298804,0.0019694022,0.000043791842,0.00020874769,0.00022742568,0.99291575,0.000004475709],"about_ca_topic_score_codex":0.077309184,"about_ca_topic_score_gemma":0.1880262,"teacher_disagreement_score":0.18671608,"about_ca_system_score_codex":0.0022900933,"about_ca_system_score_gemma":0.0028338486,"threshold_uncertainty_score":0.6246275},"labels":[],"label_agreement":null},{"id":"W820688658","doi":"","title":"COMMUTER RAIL DEVELOPMENTS 2004","year":2004,"lang":"en","type":"article","venue":"Mass transit","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; Engineering; Telecommunications; Section (typography); Business; Advertising","score_opus":0.015529196448907271,"score_gpt":0.18600790339144596,"score_spread":0.1704787069425387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W820688658","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02326313,0.015456256,0.00094277743,0.018808618,0.002348262,0.000057511486,0.003513643,0.0006010492,0.9350087],"genre_scores_gemma":[0.035403594,0.009342757,0.0005937102,0.0011896982,0.0003347988,0.000024440162,0.0020765632,0.000063645624,0.95097077],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994168,0.000050366958,0.000029910672,0.00013000969,0.00024671413,0.00012611624],"domain_scores_gemma":[0.9994253,0.000047061516,0.000040652325,0.000042065873,0.00030671988,0.00013831635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005012842,0.00025999921,0.00014027131,0.0013103904,0.0012005618,0.0034749217,0.0004485492,0.0011211439,0.12274245],"category_scores_gemma":[0.0011518822,0.00023453307,0.00015929817,0.0024179802,0.00033629267,0.0013220501,0.00090469804,0.0012757799,0.022337038],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006797003,0.00007071075,0.0042654066,0.0001929655,0.0000064202386,0.00020755056,0.00089250813,0.00024416632,0.0007626804,0.07767727,0.6359076,0.2797048],"study_design_scores_gemma":[8.880768e-7,0.000006620388,0.0016216519,0.000014101556,5.0618803e-7,0.000019576728,0.00005540234,0.000012006394,0.000050734212,0.00008431943,0.9981329,0.0000012501205],"about_ca_topic_score_codex":0.07278818,"about_ca_topic_score_gemma":0.11668887,"teacher_disagreement_score":0.12274245,"about_ca_system_score_codex":0.004512512,"about_ca_system_score_gemma":0.0034347007,"threshold_uncertainty_score":0.41061437},"labels":[],"label_agreement":null}]}