{"meta":{"query_hash":"dd66b661574f","filters":{"venue":"Modular and Offsite Construction (MOC) Summit Proceedings"},"cohort_total":242,"direct_labels_cover":0,"predictions_cover":242,"exported":242,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/dd66b661574f","api":"https://metacan.xera.ac/api/v1/cohort?venue=Modular+and+Offsite+Construction+%28MOC%29+Summit+Proceedings"},"results":[{"id":"W2555629863","doi":"10.29173/mocs15","title":"Implementing Sustainable Construction Principles and Practices by Key Stakeholders","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Champion; Sustainable development; Context (archaeology); Promotion (chess); Order (exchange); Government (linguistics); Questionnaire; Construction industry; Resource (disambiguation); Process management; Environmental resource management; Environmental economics; Marketing; Engineering; Political science; Computer science; Economics; Construction engineering","score_opus":0.020259241857265697,"score_gpt":0.23555052458478606,"score_spread":0.21529128272752038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2555629863","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90281147,0.0005074458,0.023371981,0.010595022,0.00010349499,0.0014462776,0.00012345499,0.000098913864,0.06094189],"genre_scores_gemma":[0.98385173,0.00045112902,0.009250027,0.00081339007,0.000011808171,0.00043354332,0.00005726782,0.000022007656,0.0051090224],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9870876,0.0075350297,0.0007325983,0.0005887977,0.0020854385,0.0019705067],"domain_scores_gemma":[0.98924875,0.004607416,0.0008369534,0.0005652839,0.0029703507,0.0017712383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015996939,0.0004946405,0.00032782234,0.0011515783,0.004168025,0.0045529036,0.0007714355,0.002298709,0.0054588993],"category_scores_gemma":[0.019840548,0.0004088308,0.00041395452,0.0008996525,0.0022681162,0.0038043244,0.005835215,0.002254671,0.0008628104],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021093643,0.001061221,0.07550946,0.0015022943,0.000070044865,0.0030285944,0.6173827,0.0020623321,0.044744994,0.033258446,0.0060702725,0.21509863],"study_design_scores_gemma":[0.000048432878,0.001256133,0.045906987,0.0012631587,0.000051464773,0.0014709721,0.7103108,0.0033937364,0.012922045,0.020193985,0.20297301,0.0002092483],"about_ca_topic_score_codex":0.0019244198,"about_ca_topic_score_gemma":0.0027270191,"teacher_disagreement_score":0.015996939,"about_ca_system_score_codex":0.00255187,"about_ca_system_score_gemma":0.0063390057,"threshold_uncertainty_score":0.084600866},"labels":[],"label_agreement":null},{"id":"W2562423509","doi":"10.29173/mocs176","title":"Social Network Analysis of Stakeholder Relationships during Construction Industrialization in China","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Knowledge Management and Sharing","field":"Social Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Industrialisation; Social network analysis; Stakeholder; China; Social network (sociolinguistics); Business; Environmental resource management; Regional science; Political science; Geography; Sociology; Public relations; Computer science; Social science; Economics; Social capital; Social media; World Wide Web","score_opus":0.07890519630173473,"score_gpt":0.27890504268514144,"score_spread":0.1999998463834067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2562423509","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99860865,0.00001913264,0.0002650897,0.00006464617,0.0000010016299,0.000015475343,0.00007590531,0.0000025794895,0.00094766024],"genre_scores_gemma":[0.9992526,0.000028383982,0.00015696806,0.000007333776,9.581402e-7,0.000023893344,0.00012941488,8.1329415e-7,0.0003996209],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99915135,0.00032155943,0.0000551528,0.000109985485,0.0001599843,0.00020202492],"domain_scores_gemma":[0.99816495,0.00059554615,0.0005223843,0.00009306402,0.00038829783,0.00023577905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011178752,0.00020126383,0.0001831066,0.0029977658,0.0014046778,0.0005709349,0.00035683555,0.00031742163,0.0014350538],"category_scores_gemma":[0.002937787,0.00010780883,0.000255983,0.0032089073,0.00043129097,0.00090748613,0.0011049001,0.00017397308,0.000096249976],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001234242,0.000094961695,0.92520386,0.000083305466,0.000045214583,0.0005579561,0.030495493,0.0024029322,0.0017573924,0.0024895347,0.00094754586,0.035798326],"study_design_scores_gemma":[0.0000041879143,0.00005073676,0.9493206,0.00001966112,0.000021585898,0.000069158115,0.036468387,0.01093711,0.00034395242,0.000592415,0.0021562905,0.000015936248],"about_ca_topic_score_codex":0.064864814,"about_ca_topic_score_gemma":0.07966739,"teacher_disagreement_score":0.064864814,"about_ca_system_score_codex":0.002709223,"about_ca_system_score_gemma":0.0018917675,"threshold_uncertainty_score":0.1289745},"labels":[],"label_agreement":null},{"id":"W2772066927","doi":"10.29173/mocs158","title":"Design Breakdown in Industrialized Construction: Supporting Lean Manufacturing","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"VINNOVA","keywords":"Standardization; Lean manufacturing; Modular design; Context (archaeology); Manufacturing engineering; Lean construction; Lean project management; Process (computing); Supply chain; Process management; Engineering; Computer science; Business; Construction engineering; Construction industry; Marketing","score_opus":0.024378436996921063,"score_gpt":0.21786821238787568,"score_spread":0.19348977539095463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772066927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6834624,0.0005135092,0.2758725,0.002112874,0.00006286281,0.00026686836,0.000057517846,0.0010653276,0.036586173],"genre_scores_gemma":[0.9254696,0.00014838208,0.07098262,0.00013149733,0.000010145616,0.000106532956,0.00007438426,0.00007758632,0.002999256],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9919191,0.003639864,0.0003485478,0.00062400685,0.0025917378,0.0008767757],"domain_scores_gemma":[0.99049765,0.0039189337,0.0017197351,0.0017997455,0.0013934106,0.00067045214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072962204,0.00065250054,0.00043479854,0.0020558909,0.0032085855,0.0065860176,0.0019172681,0.0014199778,0.002284924],"category_scores_gemma":[0.012209293,0.0005919839,0.00037422028,0.0020482526,0.0033840647,0.0034026303,0.0059738536,0.002252038,0.00051616895],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053639454,0.0013316566,0.03582461,0.00060071796,0.000069906055,0.0033814984,0.10860716,0.04054228,0.029544782,0.108752325,0.0058506313,0.66495806],"study_design_scores_gemma":[0.0003107525,0.0023203879,0.04771282,0.0013562534,0.000119439,0.003897342,0.16057178,0.2281173,0.07001256,0.25102207,0.23416445,0.0003947841],"about_ca_topic_score_codex":0.003857188,"about_ca_topic_score_gemma":0.004608824,"teacher_disagreement_score":0.0072962204,"about_ca_system_score_codex":0.005449319,"about_ca_system_score_gemma":0.0070951553,"threshold_uncertainty_score":0.039537787},"labels":[],"label_agreement":null},{"id":"W2797021855","doi":"10.29173/mocs51","title":"Prefabrication in the Australian context","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Context (archaeology); Architectural engineering; Engineering; Settlement (finance); Interpretation (philosophy); Product (mathematics); Civil engineering; Construction engineering; Computer science; History; Archaeology; World Wide Web","score_opus":0.013321409691143605,"score_gpt":0.21645898710042966,"score_spread":0.20313757740928606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797021855","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44460806,0.018181732,0.016943177,0.029867483,0.00077012496,0.00015498362,0.00015028664,0.00015964796,0.48916453],"genre_scores_gemma":[0.849797,0.016373305,0.010412669,0.0033656417,0.00014648584,0.000060989827,0.00010769508,0.000087329325,0.11964889],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984352,0.00033970154,0.00007538135,0.00018160454,0.0007022687,0.00026585124],"domain_scores_gemma":[0.9991861,0.00014611836,0.00009348872,0.00009529408,0.00029716405,0.00018181602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001872733,0.00028537997,0.000223059,0.0010347161,0.0043353946,0.0035678009,0.0009057347,0.0015631886,0.009035014],"category_scores_gemma":[0.0017051186,0.0003138605,0.00021866447,0.0021170336,0.003865366,0.0024339443,0.0053525595,0.0021897044,0.0006074431],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007423004,0.0002898974,0.009708895,0.00107439,0.000015131141,0.004953614,0.126855,0.0018272297,0.012842724,0.44546214,0.0260032,0.3708935],"study_design_scores_gemma":[0.0000035230169,0.00017708745,0.03773167,0.00064974814,0.00001367461,0.0027221213,0.028306868,0.0013101263,0.001844824,0.0215213,0.90566903,0.000050026993],"about_ca_topic_score_codex":0.061209485,"about_ca_topic_score_gemma":0.10096301,"teacher_disagreement_score":0.061209485,"about_ca_system_score_codex":0.0059053167,"about_ca_system_score_gemma":0.006379583,"threshold_uncertainty_score":0.121706426},"labels":[],"label_agreement":null},{"id":"W2804760574","doi":"10.29173/mocs2","title":"A comparison between Volumetric Timber Manufacturing Strategies in the UK and mainland Europe","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Strathclyde","keywords":"Context (archaeology); Variety (cybernetics); Flexibility (engineering); Productivity; Prefabrication; Mainland; Production (economics); Quality (philosophy); Factory (object-oriented programming); Greenhouse gas; Legislation; Engineering; Business; Architectural engineering; Environmental economics; Operations management; Civil engineering; Computer science; Economics","score_opus":0.011403069545361544,"score_gpt":0.21569144283581632,"score_spread":0.20428837329045477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804760574","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98098904,0.0010418463,0.0010339064,0.00007825907,0.00001004338,0.00005241559,0.00013952878,0.000015873282,0.016639158],"genre_scores_gemma":[0.9906669,0.0010862949,0.0020010099,0.000071877526,0.0000034801765,0.00003211057,0.0003267759,0.000020975363,0.005790592],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9978041,0.00040504974,0.00021305593,0.00029181677,0.0008376338,0.0004483496],"domain_scores_gemma":[0.9982326,0.00048811437,0.0004128398,0.00016139096,0.0005501395,0.00015493014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018366091,0.00030397272,0.00021447343,0.0021620586,0.00081089715,0.0022157317,0.00048475416,0.00047878534,0.0026881502],"category_scores_gemma":[0.0026771482,0.00026199193,0.00046539912,0.002747579,0.0008078903,0.00085372996,0.001475695,0.00019386847,0.0005049437],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021309592,0.00045369417,0.4116709,0.0011699218,0.00021598359,0.0033464702,0.029500993,0.0060445843,0.033414435,0.011804546,0.0034318792,0.49681565],"study_design_scores_gemma":[0.000034381108,0.0012465,0.92383903,0.00035208874,0.00010408914,0.0013993528,0.02715568,0.0010115424,0.006611427,0.0003700144,0.037816882,0.00005906307],"about_ca_topic_score_codex":0.022033956,"about_ca_topic_score_gemma":0.08282086,"teacher_disagreement_score":0.022033956,"about_ca_system_score_codex":0.0032619177,"about_ca_system_score_gemma":0.0010481452,"threshold_uncertainty_score":0.04381144},"labels":[],"label_agreement":null},{"id":"W2807770285","doi":"10.29173/mocs161","title":"Energy Performance Monitoring and Analysis of NetZero Energy Homes (NZEHs)","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Energy consumption; Energy (signal processing); Consumption (sociology); Energy balance; Efficient energy use; Total energy; Environmental economics; Architectural engineering; Environmental science; Energy accounting; Engineering; Electrical engineering; Statistics; Economics","score_opus":0.007883676736573876,"score_gpt":0.1783181468304867,"score_spread":0.17043447009391283,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2807770285","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98260605,0.00008223771,0.0074295797,0.00002644552,0.0000065105933,0.000075797354,0.0025164797,0.0001914248,0.0070653595],"genre_scores_gemma":[0.98937935,0.0001237931,0.0058442364,0.000010751327,0.0000016247284,0.00004348266,0.0019494706,0.000025255515,0.0026219753],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996413,0.000020317892,0.000010327386,0.000044076776,0.0002467947,0.000037092017],"domain_scores_gemma":[0.99975413,0.000022021744,0.000025694764,0.000017558454,0.0001639403,0.000016592998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002936622,0.0003160037,0.00025913873,0.0008416377,0.00038819708,0.00049547147,0.00037386068,0.00014998477,0.0009652968],"category_scores_gemma":[0.00032524508,0.00009835249,0.00015074368,0.0011962963,0.00022076881,0.00025943364,0.00029162297,0.00016862091,0.00033280536],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065294356,0.0003903975,0.6429565,0.00033930293,0.00007457521,0.00060295215,0.0020924462,0.01943296,0.10191805,0.0011564835,0.0067190356,0.2236644],"study_design_scores_gemma":[0.00001240404,0.00019459554,0.91368175,0.000027034093,0.00004193852,0.00018549038,0.0017234571,0.021986324,0.054136608,0.00027109002,0.0077101183,0.000029294286],"about_ca_topic_score_codex":0.06442049,"about_ca_topic_score_gemma":0.19152509,"teacher_disagreement_score":0.06442049,"about_ca_system_score_codex":0.0009722641,"about_ca_system_score_gemma":0.00062952965,"threshold_uncertainty_score":0.12809104},"labels":[],"label_agreement":null},{"id":"W2898328996","doi":"10.29173/mocs172","title":"Permanent Modular Construction: Construction Performance","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Modular construction; Sample (material); Construction industry; Computer science; Construction management; Test (biology); Engineering; Construction engineering; Civil engineering","score_opus":0.011126353265989914,"score_gpt":0.1857710283249126,"score_spread":0.1746446750589227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898328996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9763035,0.000098249584,0.0030962403,0.000060236587,0.000012732733,0.00006715098,0.00033895657,0.00009720705,0.019925745],"genre_scores_gemma":[0.99585515,0.0000621865,0.00165044,0.00000578135,0.0000057977923,0.000014565881,0.00029310587,0.000033637953,0.0020791763],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946753,0.00093253196,0.00023630077,0.00038353956,0.0033354084,0.00043698327],"domain_scores_gemma":[0.98955125,0.0030629789,0.0025981804,0.0010517791,0.0030449566,0.00069088617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044776015,0.0006078065,0.00033010426,0.0017732641,0.00061456684,0.0015548837,0.00086010207,0.0004489451,0.007630033],"category_scores_gemma":[0.014802755,0.00021649576,0.00034994082,0.0018756909,0.0010972244,0.0013321565,0.0014925238,0.00040151222,0.0016232089],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019116262,0.0013486602,0.55745184,0.0007398616,0.00015575695,0.0004716582,0.004010737,0.031162659,0.02525477,0.0041588433,0.004421465,0.36891207],"study_design_scores_gemma":[0.000032784275,0.006520517,0.9338955,0.00010610827,0.000101216116,0.001126292,0.0051387344,0.0141087845,0.022627972,0.0015972267,0.014646469,0.00009838159],"about_ca_topic_score_codex":0.0033646773,"about_ca_topic_score_gemma":0.0053057964,"teacher_disagreement_score":0.007630033,"about_ca_system_score_codex":0.0015391038,"about_ca_system_score_gemma":0.0011130123,"threshold_uncertainty_score":0.025524974},"labels":[],"label_agreement":null},{"id":"W2902687294","doi":"10.29173/mocs52","title":"Manufacturing of modular buildings: a literature review","year":2017,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Factory (object-oriented programming); Process (computing); Field (mathematics); Manufacturing engineering; Productivity; Engineering; Systems engineering; Advanced manufacturing; Computer science; Process management; Engineering management","score_opus":0.020615670465966136,"score_gpt":0.2617338821326967,"score_spread":0.2411182116667306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2902687294","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024000072,0.99819046,0.0001683045,0.0002164123,0.00008338306,0.00001599104,0.000048595513,0.000005689483,0.0010311956],"genre_scores_gemma":[0.0012355879,0.99816173,0.00029958287,0.00009340828,0.000039384213,0.000012050159,0.00004212201,0.0000015324983,0.000114661336],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989642,0.00022129847,0.00025302498,0.00013660941,0.00036475583,0.000060081227],"domain_scores_gemma":[0.9958859,0.0028174638,0.0005030505,0.000075613214,0.00063653797,0.000081452075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016633983,0.0011873133,0.0016077383,0.009405292,0.0005896956,0.002146277,0.0015493673,0.0013814252,0.0062892823],"category_scores_gemma":[0.0047500706,0.00060872827,0.0015173972,0.011506652,0.000700642,0.002558543,0.0010545915,0.0009807934,0.0009820202],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058731806,0.00007488451,0.00055420096,0.29321906,0.00031173596,0.00039082425,0.0005803502,0.0006836573,0.0005358928,0.00594133,0.020697407,0.67695194],"study_design_scores_gemma":[0.000013866483,0.000100302874,0.003170385,0.21501395,0.0011785702,0.0014254018,0.0007757235,0.00018486475,0.00040199587,0.002477316,0.775216,0.000041701074],"about_ca_topic_score_codex":0.00540224,"about_ca_topic_score_gemma":0.009665254,"teacher_disagreement_score":0.009405292,"about_ca_system_score_codex":0.0013651457,"about_ca_system_score_gemma":0.005797201,"threshold_uncertainty_score":0.021039724},"labels":[],"label_agreement":null},{"id":"W2914120926","doi":"10.29173/mocs57","title":"Modelling and analysis of two production solutions for precast concrete elements: a petri-nets approach","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Production (economics); Upgrade; Automation; Productivity; Computer science; Factory (object-oriented programming); Lead time; Operations research; Industrial engineering; Risk analysis (engineering); Engineering; Civil engineering; Operations management; Business; Mechanical engineering","score_opus":0.025329505509203997,"score_gpt":0.23162227908016897,"score_spread":0.20629277357096498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914120926","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040804714,0.00027306587,0.94877476,0.0001338377,0.000040501316,0.00012736548,0.00015309984,0.0002112659,0.0094813695],"genre_scores_gemma":[0.7601746,0.00085342093,0.22542791,0.000039829967,0.000018887495,0.00042428347,0.0003559933,0.00008569274,0.01261944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951684,0.00012447647,0.000031859214,0.00008823968,0.00015377962,0.000084780884],"domain_scores_gemma":[0.99949217,0.00028241225,0.00008433897,0.000019925925,0.00009024896,0.00003096955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007755964,0.0010029371,0.00054484024,0.0011330006,0.0007199154,0.0017815526,0.0012752995,0.0013171466,0.003267457],"category_scores_gemma":[0.0011381209,0.00071199634,0.0016336808,0.0007552339,0.00093810126,0.0010089364,0.00081431697,0.00087699183,0.00038438293],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017389313,0.00001563161,0.00032811478,0.000040526487,0.000010088291,0.000096691954,0.000050513092,0.984444,0.0014728971,0.01055549,0.000059632082,0.0029091295],"study_design_scores_gemma":[0.000004494858,0.00001824798,0.00011573625,0.000013453818,0.000011139893,0.000021214064,0.000028398763,0.99344504,0.000932466,0.004553802,0.0008488738,0.000007197561],"about_ca_topic_score_codex":0.021058457,"about_ca_topic_score_gemma":0.017099256,"teacher_disagreement_score":0.021058457,"about_ca_system_score_codex":0.0018899956,"about_ca_system_score_gemma":0.0027204535,"threshold_uncertainty_score":0.041871786},"labels":[],"label_agreement":null},{"id":"W2935734308","doi":"10.29173/mocs14","title":"Strengthening Sustainability Rating Credit for Off-Site Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Certification; Prefabrication; Business; Production (economics); Environmental economics; Rating system; Engineering; Economics; Civil engineering; Management; Microeconomics","score_opus":0.005288785098923352,"score_gpt":0.19536053610303913,"score_spread":0.19007175100411577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2935734308","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21527532,0.0003135045,0.021422226,0.0074864277,0.0010586875,0.0017513749,0.0015884751,0.0019322338,0.74917173],"genre_scores_gemma":[0.80942196,0.00038112805,0.018238794,0.0010638619,0.000408559,0.0005410368,0.0026345442,0.00032285295,0.16698727],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98649,0.0021996477,0.00061819825,0.0008207498,0.008346879,0.0015244565],"domain_scores_gemma":[0.9494316,0.0055425204,0.0053656385,0.0056613074,0.027521893,0.006476938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011866119,0.00070524926,0.0004643655,0.0031589833,0.0026858733,0.0047457586,0.0021024754,0.0024038318,0.039096452],"category_scores_gemma":[0.042176846,0.00041314473,0.0004783839,0.0016919127,0.0012419885,0.003208912,0.0040796334,0.002739679,0.0070441035],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005491803,0.0026377805,0.12719929,0.0003723414,0.000038832954,0.00064016326,0.003336999,0.0046966826,0.0122371,0.04778837,0.21653432,0.583969],"study_design_scores_gemma":[0.00013453347,0.0009875969,0.30880493,0.00049713865,0.000037743423,0.00053873286,0.0040197307,0.0073688286,0.0081272805,0.0109239835,0.6583023,0.00025716095],"about_ca_topic_score_codex":0.022937909,"about_ca_topic_score_gemma":0.05728013,"teacher_disagreement_score":0.039096452,"about_ca_system_score_codex":0.004176903,"about_ca_system_score_gemma":0.011567294,"threshold_uncertainty_score":0.13079065},"labels":[],"label_agreement":null},{"id":"W2935785102","doi":"10.29173/mocs61","title":"Damage assessment of semi-precast slabs using impact-echo method","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Geophysical Methods and Applications","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Quality (philosophy); Computer science; Structural engineering; Civil engineering; Construction engineering; Engineering; Physics","score_opus":0.020116537420224193,"score_gpt":0.3342767977018318,"score_spread":0.3141602602816076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2935785102","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9259969,0.00013891369,0.07164012,0.0000144325995,0.000007176525,0.000038834944,0.00011476594,0.00021656076,0.0018321992],"genre_scores_gemma":[0.9757472,0.0000984679,0.023399903,0.000006490538,0.0000022648405,0.000012907988,0.00007179601,0.000009261966,0.0006516983],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99967074,0.00003137831,0.000016069798,0.000048390448,0.00019940065,0.00003399453],"domain_scores_gemma":[0.99947566,0.00010073471,0.00012111289,0.000053187952,0.00020905926,0.00004019902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003875897,0.000464104,0.00023152435,0.001713169,0.0001347411,0.00027498245,0.00035397138,0.00036988818,0.00093513366],"category_scores_gemma":[0.0005895759,0.00018840634,0.0002280509,0.0006454779,0.0002628263,0.00034532926,0.00045435512,0.00021296796,0.00017609951],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037944695,0.00015943269,0.083113454,0.00027510637,0.00006322216,0.0005635027,0.000742225,0.040766045,0.73960686,0.0005994784,0.00026923788,0.133462],"study_design_scores_gemma":[0.000026615455,0.0005736162,0.39344817,0.00004868101,0.000093690236,0.0009002377,0.0007880242,0.350154,0.251957,0.0005895427,0.0013094097,0.00011091879],"about_ca_topic_score_codex":0.0017676306,"about_ca_topic_score_gemma":0.0043230397,"teacher_disagreement_score":0.0017676306,"about_ca_system_score_codex":0.00022236929,"about_ca_system_score_gemma":0.00022670225,"threshold_uncertainty_score":0.003514707},"labels":[],"label_agreement":null},{"id":"W2935877890","doi":"10.29173/mocs33","title":"An Experimental Framework for Investigating the Hygrothermal Properties of Multi-Functional Wood Fibre and XPS Panels for Residential Buildings","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Hygrothermal properties of building materials","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Oriented strand board; Expanded polystyrene; Polystyrene; Structural engineering; Composite material; Materials science; Engineering; Polymer","score_opus":0.028580686064650723,"score_gpt":0.22984356324318259,"score_spread":0.20126287717853186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2935877890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94538754,0.00018193576,0.04801633,0.00003747002,0.000064076055,0.0010225911,0.00056576997,0.00015842605,0.004565909],"genre_scores_gemma":[0.93448687,0.0002977719,0.060003385,0.00006825697,0.0000141181135,0.0011808192,0.00048404373,0.000045706718,0.0034191166],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99946684,0.00008091982,0.000020298987,0.000099438024,0.00023994989,0.000092577415],"domain_scores_gemma":[0.99959105,0.000071738476,0.00005809797,0.0000918668,0.00011581951,0.00007132589],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006025198,0.000747553,0.0002877254,0.0003840784,0.00075281353,0.0004392871,0.0008425468,0.0006413693,0.0029593601],"category_scores_gemma":[0.00040365756,0.00026792847,0.00040071114,0.00030529886,0.00057873013,0.00046166132,0.00059136446,0.00060942344,0.00043346392],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002281945,0.0005237091,0.0017698047,0.00016284347,0.000009552894,0.00010907445,0.00015446672,0.0022740937,0.9899457,0.0003032942,0.00007590089,0.0044433563],"study_design_scores_gemma":[0.00008281653,0.006615855,0.036425084,0.00004616041,0.00005585325,0.00018710076,0.00081377063,0.006391801,0.9429882,0.00038278894,0.00596345,0.000047044727],"about_ca_topic_score_codex":0.0035927729,"about_ca_topic_score_gemma":0.01252293,"teacher_disagreement_score":0.0035927729,"about_ca_system_score_codex":0.00063075696,"about_ca_system_score_gemma":0.00062670826,"threshold_uncertainty_score":0.009900093},"labels":[],"label_agreement":null},{"id":"W2936010761","doi":"10.29173/mocs67","title":"Assessment on the carbon efficiency in the construction stage: a comparative study between prefabricated and conventional construction","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Carbon fibers; Environmental economics; Construction industry; Key (lock); Construction engineering; Prefabrication; Civil engineering; Architectural engineering; Engineering; Computer science; Economics","score_opus":0.025493409689322153,"score_gpt":0.2744233371481048,"score_spread":0.24892992745878265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936010761","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913839,0.00029751737,0.0011307828,0.000026617665,0.000005589549,0.00002295151,0.00012080584,0.0000064921082,0.007005362],"genre_scores_gemma":[0.9975656,0.0001513089,0.0006548751,0.0000054723596,0.000002293583,0.000007819738,0.00015743765,0.000005643562,0.0014495582],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989974,0.00014074259,0.000047567108,0.000105174055,0.000603933,0.000105299805],"domain_scores_gemma":[0.9985683,0.00046560765,0.00021539451,0.000084262705,0.00058672257,0.000079745005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009803267,0.00027136074,0.00027952893,0.0024279326,0.00065147894,0.0010383406,0.000363039,0.0005303533,0.0016986786],"category_scores_gemma":[0.0015649013,0.00011841296,0.00048304125,0.0027122654,0.00063308736,0.0010315002,0.00045552387,0.00032299952,0.00028215995],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001137671,0.0007958518,0.7230075,0.00082221965,0.00032161712,0.0018794294,0.0070838374,0.018552652,0.042778127,0.008325813,0.001372748,0.19392255],"study_design_scores_gemma":[0.00001189383,0.0012815915,0.95118135,0.00007742058,0.00014015113,0.0006033372,0.00912894,0.011200334,0.016684797,0.0013348487,0.00828351,0.000071877155],"about_ca_topic_score_codex":0.005840246,"about_ca_topic_score_gemma":0.017093351,"teacher_disagreement_score":0.005840246,"about_ca_system_score_codex":0.0011120178,"about_ca_system_score_gemma":0.0005237507,"threshold_uncertainty_score":0.011612475},"labels":[],"label_agreement":null},{"id":"W2936045964","doi":"10.29173/mocs38","title":"The merits of varying forms of mass timber products for offsite and modular construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"European Regional Development Fund","keywords":"Modular design; Work (physics); Resource (disambiguation); Engineering; Quality assurance; Quality (philosophy); Construction engineering; Architectural engineering; Civil engineering; Computer science; Operations management; Mechanical engineering","score_opus":0.007958136784358116,"score_gpt":0.1857457947776659,"score_spread":0.17778765799330778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936045964","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6962402,0.005295402,0.072706014,0.0012885197,0.00019369478,0.00027395095,0.000115604205,0.00018691222,0.22369969],"genre_scores_gemma":[0.9315683,0.0017164147,0.05187839,0.00014141272,0.00009577757,0.00007289772,0.00007931642,0.00014041504,0.0143070575],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99776363,0.0005188504,0.00009772917,0.00016510722,0.0012983866,0.00015628176],"domain_scores_gemma":[0.99714667,0.0012012195,0.0004763539,0.00038837738,0.0005942913,0.00019306017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002918922,0.0004347797,0.00016559071,0.0012589901,0.00078570785,0.0024374896,0.0006886494,0.0008535888,0.006918058],"category_scores_gemma":[0.0043283566,0.00024236013,0.00036281982,0.00077341107,0.0008867249,0.0016927851,0.0013887283,0.00072404084,0.0011507093],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006328302,0.0002750983,0.023710018,0.0017286178,0.00004339346,0.0015892965,0.0052746115,0.0065762056,0.17534609,0.048539095,0.0023837788,0.7339011],"study_design_scores_gemma":[0.000077234545,0.007645681,0.25866982,0.0032570371,0.00028233122,0.017408224,0.01979964,0.010715879,0.16431886,0.039944302,0.4776524,0.00022860349],"about_ca_topic_score_codex":0.00045164523,"about_ca_topic_score_gemma":0.0031054087,"teacher_disagreement_score":0.006918058,"about_ca_system_score_codex":0.0006280497,"about_ca_system_score_gemma":0.00045576706,"threshold_uncertainty_score":0.023143172},"labels":[],"label_agreement":null},{"id":"W2936215202","doi":"10.29173/mocs9","title":"Key Factors Affecting Construction Organizations' Acceptance of BIM: A Comparative Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Process (computing); Business; Structural equation modeling; Process management; Knowledge management; Construction industry; Key (lock); Questionnaire; Technology acceptance model; Usability; Engineering; Operations management; Construction engineering; Computer science","score_opus":0.010323544486848208,"score_gpt":0.21288204685320283,"score_spread":0.20255850236635461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936215202","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99916244,0.000035929763,0.000049733662,0.000034545403,5.8124414e-7,0.000010533915,0.000009479308,9.707161e-7,0.0006958065],"genre_scores_gemma":[0.9996468,0.000081909115,0.000085726875,0.000012907766,9.4733576e-7,0.000015665611,0.00001768288,9.463623e-7,0.00013743817],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9962748,0.0016407131,0.00022088189,0.00026032998,0.00070955086,0.0008937317],"domain_scores_gemma":[0.9866803,0.0069067003,0.0027508847,0.0004359332,0.0020473998,0.001178653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006253963,0.00024640313,0.00033100304,0.002938297,0.0024953838,0.0023384432,0.00055167015,0.0005668595,0.0020720668],"category_scores_gemma":[0.011758606,0.00039167382,0.00035490686,0.004319568,0.0015805027,0.0018507413,0.0021724561,0.00058690493,0.00023458048],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019738043,0.00075833563,0.7447253,0.00019999505,0.000033998072,0.00067665684,0.2203605,0.00020049061,0.0007475997,0.0008542083,0.00030428497,0.030941365],"study_design_scores_gemma":[0.000008968799,0.00038872514,0.65069926,0.00007542521,0.00003172059,0.00018018353,0.34623754,0.00040505468,0.00021465526,0.00010951219,0.0016282347,0.00002060259],"about_ca_topic_score_codex":0.022840478,"about_ca_topic_score_gemma":0.033362012,"teacher_disagreement_score":0.022840478,"about_ca_system_score_codex":0.0037776611,"about_ca_system_score_gemma":0.0033520432,"threshold_uncertainty_score":0.045415044},"labels":[],"label_agreement":null},{"id":"W2936293110","doi":"10.29173/mocs69","title":"A novel approach of vertical city in southern china utilizing construction robotics, open building principles, modular construction and prefabrication","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Modular Robots and Swarm Intelligence","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Architectural engineering; Landmark; Roof; Prefabrication; Automation; Function (biology); Horizontal and vertical; Civil engineering; Flexibility (engineering); Computer science; Engineering; Construction engineering; Transport engineering; Geography; Artificial intelligence; Mechanical engineering; Mathematics","score_opus":0.03489743214769723,"score_gpt":0.2454177501970964,"score_spread":0.2105203180493992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936293110","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7005298,0.0006908332,0.18468201,0.0008597672,0.00015707822,0.00024324376,0.00028033977,0.0005131119,0.11204371],"genre_scores_gemma":[0.9311097,0.0002940485,0.038398605,0.000049260412,0.000019095063,0.00009044785,0.00021442444,0.000033167802,0.029791107],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99983644,0.000020346077,0.000007304497,0.00004968494,0.0000447145,0.000041527575],"domain_scores_gemma":[0.9999497,0.0000036329561,0.000008063125,0.000013070631,0.00000834537,0.000017094071],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019030205,0.0005205758,0.00017993173,0.00088826905,0.0026272573,0.0012032951,0.00051578635,0.000480479,0.0039407266],"category_scores_gemma":[0.00011384013,0.00024077256,0.00046980003,0.0013768544,0.0013544029,0.00081045413,0.0017204334,0.00034651533,0.0003302695],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030519764,0.0003177043,0.09333022,0.0006409932,0.000119688484,0.006198225,0.010935871,0.07193348,0.090603955,0.37147,0.009851785,0.34429282],"study_design_scores_gemma":[0.00019255574,0.0010768101,0.19448113,0.00020926204,0.0003425251,0.005154767,0.012080558,0.18711121,0.025589215,0.091213316,0.48215356,0.00039515903],"about_ca_topic_score_codex":0.018686274,"about_ca_topic_score_gemma":0.04677766,"teacher_disagreement_score":0.018686274,"about_ca_system_score_codex":0.001487307,"about_ca_system_score_gemma":0.0029000263,"threshold_uncertainty_score":0.037154973},"labels":[],"label_agreement":null},{"id":"W2936307821","doi":"10.29173/mocs42","title":"Training for Manufactured Construction (TRAMCON) – Benefits and Challenges for Workforce Development at Manufactured Housing Industry","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workforce; SAFER; Factory (object-oriented programming); Work (physics); Productivity; Training (meteorology); Curriculum; Quality (philosophy); Workforce development; Process (computing); Engineering; Engineering management; Business; Operations management; Economic growth; Computer science; Mechanical engineering","score_opus":0.04463706442607094,"score_gpt":0.22799795541332174,"score_spread":0.1833608909872508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936307821","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44999853,0.012089711,0.016291307,0.22798343,0.002280693,0.0004942339,0.00025199077,0.00044623535,0.2901639],"genre_scores_gemma":[0.8579705,0.0062580793,0.027745767,0.008088708,0.00040890154,0.00025867598,0.00022146903,0.00006673601,0.09898118],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989969,0.00027537762,0.000020203348,0.000058086036,0.0003003097,0.00034909204],"domain_scores_gemma":[0.9982331,0.0002864157,0.000114500035,0.00007390923,0.00034566785,0.00094644504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023016634,0.00021527964,0.00009883989,0.0004217727,0.0017186685,0.0017604077,0.0006950946,0.0011335507,0.0100697465],"category_scores_gemma":[0.0021158282,0.00010713155,0.00016384109,0.00031153552,0.00066715456,0.00087334524,0.0019940748,0.0012213466,0.0011615526],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065336804,0.00066971465,0.014451951,0.0005641714,0.000005586078,0.00031395702,0.0032207367,0.0010793258,0.0052627376,0.030766202,0.087648824,0.8559515],"study_design_scores_gemma":[0.00003169269,0.0011157556,0.11190201,0.0021142468,0.000016886395,0.0009727413,0.015433173,0.002595057,0.0042902175,0.009006057,0.85247403,0.000048186965],"about_ca_topic_score_codex":0.0074032033,"about_ca_topic_score_gemma":0.035828695,"teacher_disagreement_score":0.0100697465,"about_ca_system_score_codex":0.0023527816,"about_ca_system_score_gemma":0.010386188,"threshold_uncertainty_score":0.033686697},"labels":[],"label_agreement":null},{"id":"W2936388749","doi":"10.29173/mocs55","title":"Planning of modular construction manufacturing plant layouts using non-linear optimization","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Mathematical optimization; Production line; Computer science; Production (economics); Productivity; Optimization problem; Linear programming; Industrial engineering; Line (geometry); Engineering; Mathematics; Mechanical engineering","score_opus":0.017390903193402297,"score_gpt":0.23229776465728805,"score_spread":0.21490686146388574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936388749","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07198205,0.00027991863,0.9208239,0.00019703979,0.000044930075,0.00018295203,0.0001564357,0.0005956513,0.005737185],"genre_scores_gemma":[0.61603314,0.00025907703,0.37754428,0.00007274831,0.000025293255,0.00033473063,0.0003233436,0.00018331163,0.005224023],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995896,0.0001838386,0.0000100963525,0.00006005953,0.00008981796,0.00006651224],"domain_scores_gemma":[0.99935526,0.00042829145,0.00007908535,0.000025235937,0.000067748966,0.000044309247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006024167,0.0010935065,0.0010141196,0.0007842832,0.00035764166,0.0006163856,0.0007466805,0.000786768,0.0027205313],"category_scores_gemma":[0.0017656729,0.00085056614,0.00078172877,0.00092396996,0.0007171063,0.00056728267,0.00082650763,0.00070657185,0.0003942489],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000152241,0.000009929553,0.00011382036,0.000011893325,0.000004980257,0.000018730552,0.000007196124,0.9947995,0.00030368107,0.000526928,0.0001736058,0.0040144976],"study_design_scores_gemma":[0.000005804518,0.00001913688,0.000075611206,0.0000014431622,0.0000018415741,0.0000045775114,0.0000054937677,0.99897385,0.00013916052,0.0005657631,0.0002050842,0.0000022347147],"about_ca_topic_score_codex":0.009765322,"about_ca_topic_score_gemma":0.014492632,"teacher_disagreement_score":0.009765322,"about_ca_system_score_codex":0.0009800153,"about_ca_system_score_gemma":0.0014374158,"threshold_uncertainty_score":0.019416988},"labels":[],"label_agreement":null},{"id":"W2936431890","doi":"10.29173/mocs66","title":"Application of machine learning approach for logistics cost estimation in panelized construction","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Cost estimate; Computer science; Integrated logistics support; Overhead (engineering); Learning effect; Cost driver; Operations research; Operations management; Industrial engineering; Business; Engineering; Systems engineering; Marketing; Economics","score_opus":0.013702169269918383,"score_gpt":0.2271460182649391,"score_spread":0.21344384899502072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936431890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5137032,0.00094185915,0.4765398,0.00069673895,0.00014510233,0.00020884375,0.0012690718,0.0011453481,0.005349986],"genre_scores_gemma":[0.93819195,0.00026457882,0.058089487,0.00005807304,0.000039677565,0.00012317981,0.0011543913,0.00003343229,0.0020452847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931526,0.00019676564,0.000068024776,0.00015097368,0.00015830554,0.00011066432],"domain_scores_gemma":[0.99781907,0.0013128001,0.00023815475,0.00010967197,0.0004627272,0.000057567322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012237226,0.0009883308,0.0008898676,0.003052105,0.0004112206,0.0012069162,0.00095951464,0.0011680289,0.001809887],"category_scores_gemma":[0.0035743008,0.0003439288,0.00077478355,0.002429469,0.00024554852,0.0011208294,0.0004987182,0.0009217045,0.00043073198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011998268,0.00021654836,0.011242812,0.000060261154,0.0000544517,0.0001227596,0.000038587557,0.8709943,0.00053540396,0.00084555254,0.0014205273,0.11434883],"study_design_scores_gemma":[0.0000019909874,0.000015056773,0.0015780102,0.0000047375615,0.000004111518,0.000010232958,0.000018510666,0.9975425,0.0002250783,0.00044242627,0.00015222182,0.0000050815615],"about_ca_topic_score_codex":0.014220695,"about_ca_topic_score_gemma":0.007643233,"teacher_disagreement_score":0.014220695,"about_ca_system_score_codex":0.0012692708,"about_ca_system_score_gemma":0.0012042738,"threshold_uncertainty_score":0.028275847},"labels":[],"label_agreement":null},{"id":"W2936647771","doi":"10.29173/mocs64","title":"Construction industrialization and it integration: how tall wood buildings can show the right path towards construction 4.0","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Supply chain; Architectural engineering; Construction industry; Industrialisation; Path (computing); Order (exchange); Construction engineering; Computer science; Engineering; Business; Operations management; Marketing; Economics","score_opus":0.012123822031777934,"score_gpt":0.2026194617216751,"score_spread":0.1904956396898972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936647771","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09371895,0.007931463,0.06505383,0.052403163,0.0007056233,0.00007462607,0.00005369535,0.0005566635,0.77950203],"genre_scores_gemma":[0.92256993,0.005214416,0.02771137,0.0030984064,0.0002391456,0.00006895969,0.000092604365,0.00022831204,0.040776838],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9960834,0.0021524397,0.00008701558,0.00020835883,0.00087570644,0.00059300184],"domain_scores_gemma":[0.9983358,0.0006734002,0.00015133864,0.00022492842,0.00025994692,0.00035458326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003905923,0.000596154,0.00026461878,0.0017315471,0.0036983413,0.014097142,0.0007931277,0.0020857072,0.0109278355],"category_scores_gemma":[0.0035140323,0.0004076411,0.00042528537,0.002500388,0.010910137,0.014298907,0.008723544,0.0025041539,0.0015944828],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000532295,0.00009181554,0.004154573,0.00018220284,0.000021251319,0.00058736565,0.032977827,0.0010958585,0.0015307582,0.78852063,0.015763331,0.15502115],"study_design_scores_gemma":[0.000013892784,0.00013746881,0.0071615176,0.00077437575,0.000038725302,0.00074062427,0.053664092,0.00253008,0.001695077,0.30412754,0.629062,0.000054525408],"about_ca_topic_score_codex":0.0050519793,"about_ca_topic_score_gemma":0.007134181,"teacher_disagreement_score":0.014097142,"about_ca_system_score_codex":0.0035262003,"about_ca_system_score_gemma":0.0042442544,"threshold_uncertainty_score":0.036557198},"labels":[],"label_agreement":null},{"id":"W2936733265","doi":"10.29173/mocs7","title":"Optimum Assembly Planning for Modular Construction Using BIM and 3D Point Clouds","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Modular design; Point cloud; Component (thermodynamics); Computer science; Matching (statistics); Point (geometry); Engineering drawing; Systems engineering; Industrial engineering; Reliability engineering; Engineering; Embedded system; Mathematics; Artificial intelligence","score_opus":0.023971161170569223,"score_gpt":0.22858554936748074,"score_spread":0.20461438819691152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936733265","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017152118,0.00007033554,0.9808834,0.000032452943,0.000009679085,0.000064950684,0.00008259164,0.00039249737,0.0013120944],"genre_scores_gemma":[0.3538042,0.00014001945,0.6440365,0.000022610086,0.000009507294,0.00024057849,0.0004094064,0.00027421067,0.0010629277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926144,0.00016554442,0.000034813354,0.00015125926,0.00029246492,0.00009457044],"domain_scores_gemma":[0.99933064,0.0003095966,0.00010781499,0.000096110525,0.0001128429,0.00004302274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011398065,0.0016215853,0.00124971,0.0017196399,0.0008220255,0.0014267464,0.0011605583,0.001041643,0.0025595985],"category_scores_gemma":[0.002207918,0.0015000141,0.0015216266,0.0018132145,0.0010255455,0.0013878642,0.0015745508,0.000989378,0.00059465505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003203327,0.00002373825,0.00059845776,0.000036964284,0.000014078767,0.00003937549,0.00005692073,0.96619093,0.0019606045,0.0028112473,0.0003956283,0.027839946],"study_design_scores_gemma":[0.0000033828376,0.00001886464,0.00022874108,0.0000052174914,0.0000056983913,0.0000128596375,0.000025106687,0.99598783,0.0009761816,0.0022570228,0.00047116476,0.000007792745],"about_ca_topic_score_codex":0.0126738185,"about_ca_topic_score_gemma":0.02135666,"teacher_disagreement_score":0.0126738185,"about_ca_system_score_codex":0.0014765961,"about_ca_system_score_gemma":0.0022313062,"threshold_uncertainty_score":0.025200129},"labels":[],"label_agreement":null},{"id":"W2936876376","doi":"10.29173/mocs8","title":"Integration of BIM and Computer Simulations in Modular Construction, A Case Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chongqing Graduate Student Research Innovation Project","keywords":"Building information modeling; Modular design; Bridge (graph theory); Modular construction; Computer science; Discrete event simulation; Modularity (biology); Systems engineering; Productivity; Construction industry; Event (particle physics); Construction engineering; Software engineering; Engineering; Simulation; Operations management","score_opus":0.009325367435732571,"score_gpt":0.2080347975870605,"score_spread":0.19870943015132794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936876376","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8787137,0.0005031316,0.076018184,0.0008346955,0.00003500762,0.00048359678,0.00024452698,0.00026326271,0.04290398],"genre_scores_gemma":[0.9424171,0.0003335545,0.053137597,0.000031606534,0.000008570764,0.00016991919,0.00011779684,0.00002976099,0.0037541229],"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","domain_scores_codex":[0.9980464,0.0012188412,0.000070619426,0.00009790559,0.00039717654,0.00016900072],"domain_scores_gemma":[0.9985051,0.000876172,0.000109293454,0.00018166871,0.0001809808,0.00014687644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002301473,0.00056904,0.00032446248,0.0013996277,0.0011939041,0.001648049,0.0010081937,0.0014415695,0.0035992258],"category_scores_gemma":[0.0028856394,0.00034113013,0.00049624377,0.0018748571,0.0012607354,0.001261145,0.0019930853,0.00057227374,0.00037065806],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010554178,0.0028103997,0.05814767,0.0008655332,0.000120145436,0.022020523,0.010681581,0.5255729,0.01606806,0.109383374,0.007241584,0.24603283],"study_design_scores_gemma":[0.00024770724,0.001737999,0.029429425,0.00039327936,0.00014180393,0.0043280395,0.014849407,0.8290724,0.01985108,0.019635784,0.08015876,0.0001542906],"about_ca_topic_score_codex":0.011073977,"about_ca_topic_score_gemma":0.01879137,"teacher_disagreement_score":0.011073977,"about_ca_system_score_codex":0.0016425132,"about_ca_system_score_gemma":0.0015254057,"threshold_uncertainty_score":0.022019029},"labels":[],"label_agreement":null},{"id":"W2937012657","doi":"10.29173/mocs43","title":"Towards net zero energy modular housing: a case study","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Modular design; Roof; Zero-energy building; Architectural engineering; Efficient energy use; Photovoltaics; Container (type theory); Shading; Computer science; Solar gain; Window (computing); Code (set theory); Civil engineering; Solar energy; Engineering; Photovoltaic system; Mechanical engineering; Electrical engineering; Operating system","score_opus":0.008059766340086906,"score_gpt":0.19755991252716062,"score_spread":0.18950014618707373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937012657","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98783314,0.000042216245,0.0073323213,0.00005618838,0.000008640977,0.00007985293,0.00007135793,0.000041008683,0.004535254],"genre_scores_gemma":[0.98551685,0.00007480681,0.011911232,0.000011702869,0.0000043327013,0.00003346445,0.00008222835,0.000015014405,0.0023504158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","domain_scores_codex":[0.9994266,0.00023063013,0.000015987374,0.000054473287,0.00018228639,0.00009001698],"domain_scores_gemma":[0.9996432,0.00012189828,0.000037983333,0.000057128647,0.00007861035,0.000061087136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000622167,0.0005139396,0.0002451291,0.0004357122,0.0006128664,0.00069323374,0.00074198865,0.0007392837,0.0015120807],"category_scores_gemma":[0.0010971695,0.00015043236,0.00040923164,0.0004892544,0.00056845834,0.00054998824,0.0006567461,0.00031313425,0.00025363013],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026566265,0.0042720824,0.08211597,0.0013041223,0.00019113651,0.027161341,0.004709976,0.52415335,0.13084494,0.031949125,0.0070999106,0.18354143],"study_design_scores_gemma":[0.0006996125,0.016189124,0.08430723,0.00016024549,0.00025035944,0.011615502,0.011398326,0.57325375,0.2433657,0.009775774,0.048816424,0.0001679877],"about_ca_topic_score_codex":0.0026377086,"about_ca_topic_score_gemma":0.0071033635,"teacher_disagreement_score":0.0026377086,"about_ca_system_score_codex":0.0006799576,"about_ca_system_score_gemma":0.0003389748,"threshold_uncertainty_score":0.0052446723},"labels":[],"label_agreement":null},{"id":"W2937079130","doi":"10.29173/mocs56","title":"Testing and numerical analysis on cold-formed steel shear walls using corrugated steel sheathing","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Division of Civil, Mechanical and Manufacturing Innovation; National Natural Science Foundation of China; National Science Foundation","keywords":"Structural engineering; Shear wall; Cold-formed steel; Shear (geology); Parametric statistics; Stiffness; Finite element method; Steel plate shear wall; Materials science; Engineering; Geotechnical engineering; Composite material; Mathematics","score_opus":0.01899348526898386,"score_gpt":0.23068399568542672,"score_spread":0.21169051041644285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937079130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9924252,0.00002841575,0.0067229625,0.000008014472,0.0000072608295,0.000011228625,0.000041233474,0.00006522313,0.0006905166],"genre_scores_gemma":[0.99369264,0.000026643675,0.005750645,0.0000028080915,0.0000014967206,0.000008712001,0.00004958037,0.000006869613,0.0004606023],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997627,0.000029135617,0.00001769237,0.00003314186,0.000114272865,0.00004307485],"domain_scores_gemma":[0.9996107,0.000111579604,0.00007798469,0.00007086042,0.00009865506,0.000030211384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036240296,0.0004196733,0.00028011642,0.00048264174,0.00021558508,0.00023254288,0.000434977,0.00039393725,0.0007228333],"category_scores_gemma":[0.0006120749,0.00017772989,0.00031591512,0.00028777335,0.00050839246,0.00018749238,0.00022360368,0.00013819624,0.0001684297],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027176272,0.00009692391,0.011433179,0.00016346267,0.000019174004,0.0010488408,0.0003655375,0.16394904,0.8028321,0.0009131242,0.00025028002,0.018656561],"study_design_scores_gemma":[0.000037978196,0.0018491081,0.03856312,0.000032680106,0.00004936276,0.00031298684,0.0004209277,0.48646903,0.47003093,0.00022191847,0.00195804,0.00005384381],"about_ca_topic_score_codex":0.0013107687,"about_ca_topic_score_gemma":0.0022304123,"teacher_disagreement_score":0.0013107687,"about_ca_system_score_codex":0.00019205491,"about_ca_system_score_gemma":0.0003114253,"threshold_uncertainty_score":0.0026062727},"labels":[],"label_agreement":null},{"id":"W2937094644","doi":"10.29173/mocs40","title":"Mass Customisable Roofing Solutions for the New Build and Retrofit Markets in the UK","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Scottish Funding Council","keywords":"Roof; Truss; Scope (computer science); Architectural engineering; Architecture; Engineering; Factory (object-oriented programming); Multitude; Structural system; Civil engineering; Construction engineering; Computer science","score_opus":0.010084268500890062,"score_gpt":0.20075558669882732,"score_spread":0.19067131819793726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937094644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7670566,0.009220909,0.03334494,0.008336362,0.0006989435,0.0011793824,0.0006362464,0.0013446702,0.17818195],"genre_scores_gemma":[0.7234974,0.0081638675,0.06716382,0.0007523192,0.00010034443,0.00035163644,0.0008025021,0.00032051626,0.1988477],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991353,0.0000930161,0.000036397745,0.00010573037,0.00047852175,0.00015089642],"domain_scores_gemma":[0.99923563,0.00010524489,0.000095823365,0.0000937378,0.00029838373,0.00017119889],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010881148,0.00035943429,0.00017312384,0.00070207904,0.0007772227,0.0021193265,0.00051690795,0.0011400861,0.014713212],"category_scores_gemma":[0.0009960823,0.00031843822,0.00032011693,0.00047570828,0.0006533443,0.0015702567,0.001266673,0.0007579557,0.0024248704],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040744778,0.00087673176,0.006908385,0.00094270764,0.00001717819,0.0031406272,0.0055082887,0.007644493,0.26579008,0.04791544,0.041455213,0.61939335],"study_design_scores_gemma":[0.000102097016,0.0027610108,0.03683176,0.0005230699,0.00002946682,0.002341572,0.007331421,0.0083951615,0.04925672,0.003136247,0.88916713,0.00012440165],"about_ca_topic_score_codex":0.007988146,"about_ca_topic_score_gemma":0.022112506,"teacher_disagreement_score":0.014713212,"about_ca_system_score_codex":0.0029580407,"about_ca_system_score_gemma":0.0015701842,"threshold_uncertainty_score":0.049220562},"labels":[],"label_agreement":null},{"id":"W2937109357","doi":"10.29173/mocs63","title":"Comparing cross laminated timber with concrete and steel: a financial analysis of two buildings in Australia","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Profit margin; Cross laminated timber; Revenue; Timeline; Internal rate of return; Equity (law); Rate of return; Apartment; Building material; Finance; Engineering; Business; Civil engineering; Economics; Mathematics; Statistics","score_opus":0.013312322036047248,"score_gpt":0.26740484990468283,"score_spread":0.25409252786863556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937109357","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99932635,0.000026090493,0.000035731195,0.0000132129935,3.5677428e-7,0.0000051004745,0.000052487405,5.610509e-7,0.00054007425],"genre_scores_gemma":[0.99947304,0.000038584738,0.000070846945,0.0000034192478,8.3929916e-7,0.0000028314976,0.00010757624,5.530894e-7,0.00030224814],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99938715,0.00010566891,0.000034430348,0.000050440885,0.0002963371,0.00012595899],"domain_scores_gemma":[0.9989089,0.00019631907,0.0003733039,0.000024340055,0.0003044189,0.0001927931],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006011248,0.00024600452,0.00023037424,0.0019861553,0.0005234523,0.0008599845,0.0002991414,0.0003635715,0.0010412793],"category_scores_gemma":[0.0017359557,0.00014179981,0.00033822568,0.0015246151,0.00053991226,0.00071044796,0.00076445955,0.00029735712,0.00016719504],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007134215,0.00047680098,0.9379624,0.00015895025,0.00011818389,0.0020386595,0.0029772709,0.012442524,0.010992244,0.0017670254,0.00045033396,0.029902112],"study_design_scores_gemma":[0.0000039887127,0.00046628912,0.98998183,0.000013120699,0.00002419677,0.00023744575,0.0024670905,0.0050513,0.0010515706,0.000072968694,0.0006157441,0.0000144108735],"about_ca_topic_score_codex":0.048366886,"about_ca_topic_score_gemma":0.072076395,"teacher_disagreement_score":0.048366886,"about_ca_system_score_codex":0.0026817087,"about_ca_system_score_gemma":0.0006541995,"threshold_uncertainty_score":0.09617072},"labels":[],"label_agreement":null},{"id":"W2937133234","doi":"10.29173/mocs48","title":"A New Graduate Course on Modular Construction: University of Nevada, Las Vegas","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Construction Industry Institute, University of Texas at Austin; University of Texas at Austin; University of Nevada, Las Vegas","keywords":"Modular programming; Las vegas; Modular design; Standardization; Engineering management; Engineering; Course (navigation); Computer science; Political science","score_opus":0.010951262123474227,"score_gpt":0.18782798710914742,"score_spread":0.1768767249856732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937133234","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06500409,0.014556833,0.018196687,0.08160555,0.0255364,0.001017233,0.0020470268,0.0024257484,0.7896103],"genre_scores_gemma":[0.08875181,0.012228544,0.024634957,0.011513494,0.00231362,0.0008195294,0.0025939983,0.0006217396,0.85652226],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993773,0.00008489939,0.000024203824,0.00013072166,0.00021980751,0.0001631355],"domain_scores_gemma":[0.9990251,0.00006173437,0.00003665291,0.000023071309,0.00018964201,0.0006637976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001114677,0.0010874666,0.0005393647,0.00086852786,0.0022696522,0.0022785997,0.0010131564,0.001546094,0.080816224],"category_scores_gemma":[0.0011089267,0.00037627295,0.0005440937,0.00039523726,0.00067865115,0.0017242909,0.0034308445,0.0033064366,0.017689018],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010880114,0.001807552,0.0046806573,0.00028050801,0.0000073965853,0.00081956375,0.0018301454,0.00084864855,0.0046724356,0.012525532,0.76828367,0.2041351],"study_design_scores_gemma":[0.000012158673,0.0001503946,0.0032279543,0.00023659329,0.000003333342,0.00023106458,0.00092999527,0.0003365985,0.0005010596,0.003183928,0.99117285,0.000014068976],"about_ca_topic_score_codex":0.005434268,"about_ca_topic_score_gemma":0.021792537,"teacher_disagreement_score":0.080816224,"about_ca_system_score_codex":0.0024523768,"about_ca_system_score_gemma":0.0067057493,"threshold_uncertainty_score":0.2703572},"labels":[],"label_agreement":null},{"id":"W2937188115","doi":"10.29173/mocs28","title":"Recovery time analysis of back muscle fatigue in panelized residential modular construction factory","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Factory (object-oriented programming); Schedule; Rest (music); Working time; Operations management; Work (physics); Engineering; Risk analysis (engineering); Computer science; Medicine; Mechanical engineering","score_opus":0.04302297361375539,"score_gpt":0.3504669383734105,"score_spread":0.3074439647596551,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937188115","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9937989,0.000088312016,0.0053045177,0.000008753202,0.0000028809577,0.000019960578,0.00013386931,0.000036862864,0.0006059717],"genre_scores_gemma":[0.99701655,0.00005477937,0.0020591095,0.000004208622,0.0000011219478,0.000014070384,0.00016450691,0.000004163702,0.000681468],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998129,0.0000253328,0.000010724527,0.000031417538,0.00008294385,0.000036713904],"domain_scores_gemma":[0.99946004,0.00017467065,0.00012438573,0.000027108596,0.00018823807,0.000025602145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041020336,0.00022645012,0.00019351406,0.0010988639,0.0002000598,0.00023186783,0.00032875536,0.0002520925,0.0011605677],"category_scores_gemma":[0.0009146441,0.000089708505,0.0003466341,0.00058903807,0.00016525995,0.00011063228,0.00015110878,0.00013705177,0.00015809666],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0038398257,0.0008364206,0.51603884,0.0006162837,0.0001695004,0.001521723,0.0027189495,0.10655058,0.18650863,0.00073952455,0.0011045027,0.17935511],"study_design_scores_gemma":[0.000015916801,0.0012024129,0.8861787,0.000019882858,0.000046370988,0.00023627999,0.0014684125,0.098444335,0.011794216,0.00010988774,0.00045023474,0.00003335686],"about_ca_topic_score_codex":0.06123048,"about_ca_topic_score_gemma":0.052231766,"teacher_disagreement_score":0.06123048,"about_ca_system_score_codex":0.00054090744,"about_ca_system_score_gemma":0.00045136057,"threshold_uncertainty_score":0.12174815},"labels":[],"label_agreement":null},{"id":"W2937193245","doi":"10.29173/mocs23","title":"Offsite Construction in the UK Housing Sector: Barriers and Challenges","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Salford Manchester","keywords":"Affordable housing; Business; Quality (philosophy); Production (economics); Manufacturing sector; Risk analysis (engineering); Engineering; Civil engineering; Economics","score_opus":0.011805641364467725,"score_gpt":0.18072909331786943,"score_spread":0.1689234519534017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937193245","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9226589,0.005596817,0.0023543611,0.02294454,0.00021318364,0.00014269419,0.00012314295,0.000040282423,0.045926075],"genre_scores_gemma":[0.9915891,0.0029739202,0.0009786646,0.00073271437,0.000017752744,0.000046026966,0.000051289284,0.000010318187,0.0036002353],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99148375,0.0029932216,0.0005227659,0.00047258288,0.0022360983,0.0022915425],"domain_scores_gemma":[0.99206793,0.003421932,0.0013330069,0.00034902705,0.0015498555,0.0012782849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048914994,0.00033471163,0.00036872335,0.0012643436,0.0041922806,0.0064137224,0.0012651942,0.001943135,0.006046049],"category_scores_gemma":[0.009741429,0.000485193,0.00023743282,0.002985381,0.0035608811,0.003375977,0.005769766,0.0013590539,0.0007203186],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036164728,0.00065652264,0.25139263,0.0028113488,0.00004642268,0.008790127,0.20613453,0.0019642042,0.0038543423,0.095346645,0.033410944,0.39523065],"study_design_scores_gemma":[0.000024759656,0.0003447653,0.23832141,0.0035607624,0.00003351918,0.0037088697,0.5386543,0.0021626074,0.00071475434,0.00843403,0.20393322,0.00010695972],"about_ca_topic_score_codex":0.10193099,"about_ca_topic_score_gemma":0.14180848,"teacher_disagreement_score":0.10193099,"about_ca_system_score_codex":0.010065949,"about_ca_system_score_gemma":0.008514486,"threshold_uncertainty_score":0.20267534},"labels":[],"label_agreement":null},{"id":"W2937213777","doi":"10.29173/mocs20","title":"Evolution Mechanism of Off-site Construction Ecosystem Based on the LotkaäóñVolterra Model: A Case Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Supply Chain Management","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Social Science Fund of China","keywords":"Beijing; Mechanism (biology); Government (linguistics); Stakeholder; Management science; Computer science; Environmental resource management; Business; Industrial organization; Environmental economics; Ecology; Process management; Economics; China; Political science; Management","score_opus":0.010764585793149975,"score_gpt":0.19240560264202602,"score_spread":0.18164101684887604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937213777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7628984,0.0006278276,0.09120891,0.0020936332,0.000055889293,0.00024806222,0.00023676289,0.0001455701,0.14248489],"genre_scores_gemma":[0.98639905,0.00025057758,0.0068150633,0.000036735157,0.0000063632024,0.00010097829,0.00005426816,0.000014775826,0.006322098],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996413,0.00014210041,0.000016598517,0.00006103974,0.00004613567,0.0000929082],"domain_scores_gemma":[0.999551,0.00016484459,0.00007798063,0.000036857014,0.00006734554,0.00010206143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052224624,0.00039853758,0.0003487068,0.0012420753,0.0018120498,0.002961177,0.0013234352,0.001932832,0.004597057],"category_scores_gemma":[0.0010477214,0.0002639634,0.0009925375,0.0010301989,0.0019656285,0.0033036454,0.0021125516,0.0007592899,0.0003534784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001539652,0.0002679104,0.030213905,0.00017796482,0.000072583534,0.0074641854,0.0062024165,0.23487069,0.004374153,0.6967795,0.0022586086,0.017164163],"study_design_scores_gemma":[0.00007140834,0.0001808004,0.0076108566,0.00012567072,0.00010687855,0.0019164296,0.0069051664,0.8084485,0.0009824316,0.15040234,0.023141813,0.00010775935],"about_ca_topic_score_codex":0.013343769,"about_ca_topic_score_gemma":0.011859416,"teacher_disagreement_score":0.013343769,"about_ca_system_score_codex":0.002961992,"about_ca_system_score_gemma":0.0015099555,"threshold_uncertainty_score":0.026532233},"labels":[],"label_agreement":null},{"id":"W2937220994","doi":"10.29173/mocs18","title":"Modelling the Construction On-Site Technology Adoption Process","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Process (computing); Business; Exhibition; Information technology; Innovation diffusion; Engineering; Marketing; Computer science; Economics; Economic growth; Geography","score_opus":0.039397798217038524,"score_gpt":0.2882239834770909,"score_spread":0.24882618526005235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937220994","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79919493,0.00058126886,0.16257831,0.002378856,0.000056929668,0.00055326545,0.0011520352,0.00022219658,0.033282157],"genre_scores_gemma":[0.96782315,0.0005381691,0.018226516,0.000069345646,0.000017434135,0.00039076182,0.0004177476,0.0000444634,0.012472419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983341,0.00083429,0.0000781944,0.00022738827,0.00016686403,0.00035918038],"domain_scores_gemma":[0.98731893,0.01000688,0.0012525647,0.00030471824,0.00061745895,0.0004994799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038105838,0.0010520848,0.00074921903,0.0016724007,0.00076472946,0.0037102588,0.0016992012,0.003909808,0.01074345],"category_scores_gemma":[0.012782254,0.0009426653,0.0012521639,0.0023897965,0.0011298126,0.00311151,0.0019277115,0.0022789096,0.001631169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024169509,0.00058061973,0.026631799,0.00020873245,0.0000772048,0.00073007285,0.002463371,0.87612265,0.0011440984,0.07115664,0.0011033494,0.019539818],"study_design_scores_gemma":[0.0000455659,0.00012255272,0.0031797069,0.00003344056,0.000029352548,0.00007546418,0.0008046089,0.9821046,0.00017967004,0.011602407,0.0017949264,0.000027657708],"about_ca_topic_score_codex":0.0362647,"about_ca_topic_score_gemma":0.022808949,"teacher_disagreement_score":0.0362647,"about_ca_system_score_codex":0.0038217106,"about_ca_system_score_gemma":0.0028192287,"threshold_uncertainty_score":0.072107196},"labels":[],"label_agreement":null},{"id":"W2937277232","doi":"10.29173/mocs53","title":"Research and discussion over seismic performance of modular structure","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Key Research and Development Program of China; National Science Foundation","keywords":"Modular design; Modular construction; Connection (principal bundle); Frame (networking); Structural engineering; Steel frame; Computer science; Engineering; Mechanical engineering; Programming language","score_opus":0.012744022963956596,"score_gpt":0.24042617362512883,"score_spread":0.22768215066117223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937277232","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57443714,0.034581576,0.2217636,0.0032005399,0.00065637095,0.000080738966,0.00046142412,0.00052047754,0.16429819],"genre_scores_gemma":[0.94914114,0.019339584,0.01761054,0.00019866873,0.00033150494,0.000035364195,0.00025240015,0.00011512448,0.012975651],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936765,0.00010869622,0.000029428713,0.00012184085,0.00030249683,0.000069969385],"domain_scores_gemma":[0.99919695,0.0003024717,0.0000807616,0.00007381878,0.00029827433,0.000047777397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010451886,0.0005471092,0.00030952913,0.0008757626,0.0003444008,0.0007361727,0.00076457503,0.0007311281,0.0055785123],"category_scores_gemma":[0.0015582666,0.00021414467,0.00040930617,0.0013747764,0.0006026665,0.0014052063,0.00061517867,0.00046733604,0.00083008775],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035431402,0.00014806724,0.019937437,0.0025281697,0.00009613193,0.0010512428,0.002548052,0.107621424,0.14212736,0.08580232,0.0070684585,0.630717],"study_design_scores_gemma":[0.00005737928,0.0032764177,0.08846808,0.0013656558,0.00040626936,0.0039810566,0.0054039815,0.29605845,0.2689799,0.04884066,0.2828194,0.00034270284],"about_ca_topic_score_codex":0.0010561927,"about_ca_topic_score_gemma":0.0008040629,"teacher_disagreement_score":0.0055785123,"about_ca_system_score_codex":0.00055931177,"about_ca_system_score_gemma":0.0003117928,"threshold_uncertainty_score":0.018661976},"labels":[],"label_agreement":null},{"id":"W2937473149","doi":"10.29173/mocs17","title":"Measuring and Tracking Externalized Work to Support Industrialized Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Tacit knowledge; Work (physics); Explicit knowledge; Predictability; Computer science; Control (management); Industrialisation; Risk analysis (engineering); Externalization; Knowledge management; Industrial engineering; Operations research; Engineering; Business; Artificial intelligence; Economics; Civil engineering","score_opus":0.024475541612357102,"score_gpt":0.20583987920049232,"score_spread":0.18136433758813522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937473149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4281089,0.00021144266,0.5501796,0.0004068571,0.000028219414,0.00035963254,0.00013018482,0.000680278,0.01989491],"genre_scores_gemma":[0.94134504,0.00007873996,0.05783256,0.000009875512,0.000005933113,0.000065148924,0.000053059684,0.000026340047,0.00058332295],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99745375,0.0010112512,0.0001260885,0.00023884693,0.0010080752,0.00016205716],"domain_scores_gemma":[0.9929259,0.0028907857,0.00198559,0.000925629,0.0010918429,0.0001803486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034525227,0.0008696976,0.00040610417,0.002468348,0.00088633003,0.0025058065,0.0009563795,0.00049508037,0.0014156753],"category_scores_gemma":[0.008287428,0.00028691808,0.0002628,0.0014911473,0.0018158642,0.0028050349,0.0023335768,0.00063969573,0.00019798816],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053942355,0.0008055621,0.076073274,0.0004949708,0.000100501806,0.00035016873,0.006642441,0.30927828,0.0350165,0.05607118,0.001173626,0.5134541],"study_design_scores_gemma":[0.00005442183,0.0012921542,0.10553257,0.00035469356,0.00009388724,0.00019306476,0.0073536593,0.7796223,0.04940273,0.045562673,0.010299394,0.00023844905],"about_ca_topic_score_codex":0.0031090144,"about_ca_topic_score_gemma":0.005922161,"teacher_disagreement_score":0.0034525227,"about_ca_system_score_codex":0.0018985856,"about_ca_system_score_gemma":0.0020731408,"threshold_uncertainty_score":0.01825893},"labels":[],"label_agreement":null},{"id":"W2937475472","doi":"10.29173/mocs44","title":"Evaluation of Existing Layout Improvement and Creation Algorithms for Use in the Offsite Construction Industry","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Inefficiency; Quality (philosophy); Process (computing); Risk analysis (engineering); Computer science; Engineering; Construction engineering; Manufacturing engineering; Business","score_opus":0.05463544794387017,"score_gpt":0.2873107308018266,"score_spread":0.23267528285795644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937475472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23417059,0.0030672676,0.73912525,0.00026045306,0.00015273588,0.0007659625,0.0005563317,0.004601533,0.017299943],"genre_scores_gemma":[0.33663824,0.0012848756,0.6583475,0.000048479225,0.000018311692,0.0002766931,0.0007558568,0.0003654262,0.0022646745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99814403,0.00063274667,0.0001224034,0.0002673618,0.00067810435,0.00015529802],"domain_scores_gemma":[0.99408734,0.0034583737,0.00049847143,0.00048473335,0.0013473703,0.00012371072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025506734,0.0016851624,0.0011717555,0.002445718,0.00058243185,0.0017626499,0.0017420124,0.0010945915,0.0036583235],"category_scores_gemma":[0.0071160295,0.0006299417,0.0009697691,0.0020645936,0.00043377848,0.0013454298,0.0007063437,0.00065731624,0.0006741879],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003967694,0.0005597651,0.0051997197,0.0010026196,0.00010296869,0.0001333714,0.00022150553,0.56035995,0.0067555252,0.0028147914,0.002125412,0.42032757],"study_design_scores_gemma":[0.000069214926,0.0006248851,0.0024289808,0.00012087863,0.00008619244,0.000092408845,0.0002203366,0.9822221,0.0077544916,0.00088342495,0.005464243,0.000032894728],"about_ca_topic_score_codex":0.007584118,"about_ca_topic_score_gemma":0.009942561,"teacher_disagreement_score":0.007584118,"about_ca_system_score_codex":0.0017723884,"about_ca_system_score_gemma":0.0019969018,"threshold_uncertainty_score":0.015079975},"labels":[],"label_agreement":null},{"id":"W2937517686","doi":"10.29173/mocs39","title":"Predictive Model for Siding Practice in Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Engineering; Bottleneck; Schedule; Industrial engineering; Duration (music); Workstation; Identification (biology); Lead time; Predictability; Operations research; Factory (object-oriented programming); Simulation; Reliability engineering; Operations management; Computer science; Mechanical engineering","score_opus":0.009971022277287269,"score_gpt":0.2220752535867429,"score_spread":0.21210423130945563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937517686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68597454,0.00022189734,0.30357912,0.00037089153,0.000053955933,0.00019728583,0.0014985343,0.0007122663,0.0073914737],"genre_scores_gemma":[0.98865426,0.000105883155,0.0068484386,0.000017845337,0.0000072515854,0.00013883636,0.00061181345,0.000019802235,0.0035958393],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938893,0.0001450595,0.000030200245,0.00019249636,0.00011854879,0.00012477643],"domain_scores_gemma":[0.99828583,0.0010346603,0.0002964962,0.000086534266,0.00024010698,0.000056379904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001477846,0.000830587,0.00066900515,0.0008039128,0.00041925322,0.0014759874,0.0013889173,0.0010992079,0.0037157496],"category_scores_gemma":[0.0028922171,0.0004960816,0.0008301661,0.00080842094,0.0005791793,0.00076921965,0.00069267536,0.0012722707,0.0006727175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006384144,0.000066879606,0.006319043,0.000017125512,0.000016862388,0.000071666545,0.000053569136,0.9870565,0.0004093143,0.0011076647,0.00020777647,0.0046097115],"study_design_scores_gemma":[0.0000031206216,0.000018436873,0.0014390881,0.0000027297806,0.000004037487,0.0000064512956,0.000012981589,0.997917,0.000102620324,0.00040545326,0.00008354503,0.0000045747015],"about_ca_topic_score_codex":0.0320679,"about_ca_topic_score_gemma":0.019645529,"teacher_disagreement_score":0.0320679,"about_ca_system_score_codex":0.0015998214,"about_ca_system_score_gemma":0.0012342305,"threshold_uncertainty_score":0.063762486},"labels":[],"label_agreement":null},{"id":"W2937620236","doi":"10.29173/mocs12","title":"Factors Affecting Construction Labor Productivity in China: A Case Study of Chongqing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Evaluation and Optimization Models","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Wage; Construction industry; China; Sustainable development; Business; Economics; Labour economics; Economic growth; Engineering; Geography","score_opus":0.01669652985371978,"score_gpt":0.23244698055832153,"score_spread":0.21575045070460175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937620236","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987489,0.000047491005,0.00036438,0.00006117421,0.0000012862498,0.000030062436,0.00010076549,0.000004226833,0.00064163696],"genre_scores_gemma":[0.99834526,0.00014110807,0.00039668972,0.000011853385,0.0000020648977,0.000026320064,0.00011647418,0.0000040290397,0.00095627166],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999252,0.00018478317,0.000045540135,0.00008064422,0.00013342296,0.00030361902],"domain_scores_gemma":[0.99908507,0.00034898118,0.00017084384,0.00007532101,0.00014080462,0.00017901104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013266874,0.0007164007,0.00046535808,0.0022470474,0.0019100542,0.0009170443,0.0010062256,0.00073728804,0.0020347182],"category_scores_gemma":[0.0013647154,0.00039365643,0.0008854999,0.004690352,0.0008982247,0.0006672903,0.0011662501,0.0004351392,0.00015967317],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004671518,0.0011539866,0.8500185,0.00045177146,0.00021258435,0.018169688,0.019806636,0.04031773,0.004823024,0.00363326,0.001702368,0.059243366],"study_design_scores_gemma":[0.000059219863,0.00046544735,0.90552723,0.000079123354,0.00012920839,0.00084115326,0.040789388,0.04509615,0.0017045777,0.00095246534,0.0042703236,0.00008581546],"about_ca_topic_score_codex":0.20364155,"about_ca_topic_score_gemma":0.22525036,"teacher_disagreement_score":0.20364155,"about_ca_system_score_codex":0.008474379,"about_ca_system_score_gemma":0.004792392,"threshold_uncertainty_score":0.4049124},"labels":[],"label_agreement":null},{"id":"W2937669126","doi":"10.29173/mocs11","title":"3d/4d Visualization Framework for Modelling Off-Site Productivity of Modular Construction Housing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Visualization; Productivity; Computer science; Process (computing); Modular construction; Systems engineering; Construction engineering; Software; Building information modeling; Engineering; Software engineering; Engineering management; Operations management; Scheduling (production processes)","score_opus":0.011258894891506678,"score_gpt":0.2132279828235479,"score_spread":0.20196908793204124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937669126","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011677292,0.00020244799,0.97779536,0.00023741952,0.000031422347,0.00010686925,0.00068754144,0.0021415933,0.007120171],"genre_scores_gemma":[0.20865163,0.0007457163,0.7852271,0.000044006134,0.000022429947,0.0003751217,0.0013647489,0.0005465687,0.0030226419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994717,0.00018671394,0.00005252489,0.00006151836,0.00017683301,0.00005076139],"domain_scores_gemma":[0.99947435,0.00021787987,0.00005221557,0.0000750098,0.00013703063,0.000043582415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012949328,0.0010889118,0.0006382016,0.0024951724,0.00076564495,0.003775134,0.0018307588,0.0014598047,0.0051156753],"category_scores_gemma":[0.0019320917,0.000695591,0.0017408014,0.0019767624,0.0009722146,0.0017205725,0.0022088543,0.0010396754,0.0008542796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007371989,0.000100413294,0.0024404083,0.00031059174,0.000056765442,0.00040970824,0.0020402893,0.8161334,0.008566502,0.100877956,0.004129849,0.064860456],"study_design_scores_gemma":[0.000013941637,0.000031646145,0.0008058158,0.00010622095,0.000022171445,0.00015542841,0.00034220953,0.9516993,0.0025977818,0.013417629,0.030749109,0.00005877928],"about_ca_topic_score_codex":0.02160566,"about_ca_topic_score_gemma":0.023503898,"teacher_disagreement_score":0.02160566,"about_ca_system_score_codex":0.0013126001,"about_ca_system_score_gemma":0.0017687567,"threshold_uncertainty_score":0.04295981},"labels":[],"label_agreement":null},{"id":"W2937746629","doi":"10.29173/mocs59","title":"Experimental investigation on torsional behavior of composite beams reinforced with two-piece enclosed stirrups","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Reinforced concrete; Structural engineering; Materials science; Composite number; Torque; Stirrup; Beam (structure); Composite material; Engineering; Physics","score_opus":0.014053041070273341,"score_gpt":0.22488302283015327,"score_spread":0.21082998175987994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937746629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988061,0.000031704243,0.00086575374,0.0000019432243,0.000002608421,0.000006454063,0.000036245525,0.00000857121,0.0002405033],"genre_scores_gemma":[0.9977071,0.00004422415,0.0015878762,0.0000031231743,0.0000025452832,0.000011055995,0.00006611657,0.0000057800335,0.0005720239],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99965155,0.00003989591,0.000015198901,0.000057364046,0.00016970799,0.00006626905],"domain_scores_gemma":[0.9994885,0.00015023754,0.000107197535,0.00006349124,0.00013432537,0.000056243633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003816563,0.0005633506,0.0002665198,0.00036426558,0.0002589409,0.000091749556,0.00026599053,0.00030164386,0.0016890222],"category_scores_gemma":[0.00043058215,0.00025563373,0.00021312578,0.00023945296,0.0003486081,0.00021588539,0.00023242873,0.0003004811,0.00019462914],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012361976,0.000053420034,0.0011780108,0.000025966878,0.0000036428098,0.000041985804,0.000071659255,0.00057968684,0.9966558,0.000017070113,0.000006544351,0.0012425986],"study_design_scores_gemma":[0.000015887566,0.0029249643,0.026608648,0.000008550394,0.00001973835,0.0001085891,0.00014026418,0.0024818585,0.9672339,0.000019309542,0.0004208128,0.000017483024],"about_ca_topic_score_codex":0.0008460927,"about_ca_topic_score_gemma":0.002531281,"teacher_disagreement_score":0.0016890222,"about_ca_system_score_codex":0.00014893673,"about_ca_system_score_gemma":0.00016166831,"threshold_uncertainty_score":0.0056503415},"labels":[],"label_agreement":null},{"id":"W2937856499","doi":"10.29173/mocs30","title":"System Dynamics Model Application for Ergonomic Assessment of Manual Material Handling Tasks","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Musculoskeletal pain and rehabilitation","field":"Medicine","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Task (project management); Work (physics); Material handling; Computer science; Automation; System dynamics; Human factors and ergonomics; Productivity; Manual handling; Simulation; Risk analysis (engineering); Engineering; Industrial engineering; Poison control; Systems engineering; Operations management; Mechanical engineering; Medicine; Artificial intelligence","score_opus":0.006441418942844809,"score_gpt":0.2577432313047187,"score_spread":0.2513018123618739,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937856499","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0666704,0.00032199416,0.9075277,0.00030999797,0.00011526286,0.00035618158,0.0008582626,0.0037891334,0.020051163],"genre_scores_gemma":[0.8971454,0.00048324253,0.09086102,0.000056231613,0.000036479843,0.00090779585,0.00066128315,0.00020130229,0.009647286],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998455,0.000043919186,0.000011864826,0.000027735723,0.000056555567,0.000014371644],"domain_scores_gemma":[0.99960417,0.00023358769,0.000031738324,0.00001630987,0.00010212031,0.000012157118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030598394,0.0008598345,0.0005193363,0.0005778794,0.0005564245,0.00092143577,0.0004917725,0.0012500826,0.0077434885],"category_scores_gemma":[0.0012934007,0.00039450903,0.0006704614,0.00030529097,0.00017870648,0.00047663398,0.00055537355,0.0005878085,0.00094723084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044721353,0.000032711632,0.0010590763,0.00011182508,0.000024692083,0.00009811352,0.000109211316,0.9816745,0.0029201016,0.00125714,0.000522613,0.0121453125],"study_design_scores_gemma":[0.000006721484,0.000018541914,0.00022845725,0.000010360807,0.0000047121102,0.000010716131,0.000016960224,0.99819785,0.00032162806,0.00031733216,0.0008627792,0.000003964636],"about_ca_topic_score_codex":0.014614777,"about_ca_topic_score_gemma":0.008873183,"teacher_disagreement_score":0.014614777,"about_ca_system_score_codex":0.00040264105,"about_ca_system_score_gemma":0.0008781496,"threshold_uncertainty_score":0.02905947},"labels":[],"label_agreement":null},{"id":"W2937940533","doi":"10.29173/mocs65","title":"Using noisy RFID for accurately monitoring the assembly line of panel fabrication","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Assembly Line Balancing Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bottleneck; Timestamp; Workstation; Automotive industry; Computer science; Assembly line; Line (geometry); Production line; Reading (process); Downstream (manufacturing); Production (economics); Backup; Real-time computing; Embedded system; Operating system; Automotive engineering; Engineering; Operations management; Mechanical engineering","score_opus":0.07891345725646022,"score_gpt":0.2950000277181338,"score_spread":0.21608657046167357,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937940533","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12554385,0.00035296482,0.8715582,0.00007906633,0.000056065302,0.000019754993,0.00013999394,0.00086378073,0.0013864344],"genre_scores_gemma":[0.8817006,0.00022592481,0.116495006,0.000033493703,0.000040631832,0.00003520257,0.0002744445,0.0000568829,0.0011378132],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995802,0.00008858051,0.000022882348,0.00015094964,0.00011650987,0.000040857874],"domain_scores_gemma":[0.9991924,0.00034894614,0.00022336289,0.00009233124,0.000114476476,0.000028497243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047151698,0.0007966164,0.00046067266,0.00054124935,0.00019878735,0.00075186574,0.0006761656,0.00052642793,0.00046412452],"category_scores_gemma":[0.002651976,0.0002999802,0.00017970317,0.0007200989,0.00026093744,0.0007592674,0.00048494918,0.000418218,0.0003550962],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00070377294,0.00016591318,0.019093897,0.00020821215,0.000080435995,0.00018417955,0.00015080931,0.6090907,0.11570568,0.0033278216,0.0016015606,0.249687],"study_design_scores_gemma":[0.000010666091,0.00007406665,0.003022196,0.000005830545,0.000012461447,0.000048220638,0.000025302787,0.97914875,0.0155046545,0.0013352019,0.0007964066,0.00001624718],"about_ca_topic_score_codex":0.0010010921,"about_ca_topic_score_gemma":0.0012178476,"teacher_disagreement_score":0.0010010921,"about_ca_system_score_codex":0.0003416367,"about_ca_system_score_gemma":0.00028317352,"threshold_uncertainty_score":0.0024936795},"labels":[],"label_agreement":null},{"id":"W2937973543","doi":"10.29173/mocs32","title":"Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Constructability; Interfacing; Modular design; Computer science; Systems engineering; Project management; Construction engineering; Engineering","score_opus":0.009962290431875248,"score_gpt":0.20810793270255148,"score_spread":0.19814564227067624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937973543","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9778788,0.00010624566,0.017256115,0.00015049386,0.0000042000775,0.00008727544,0.0001227844,0.00004560191,0.0043485397],"genre_scores_gemma":[0.99236804,0.00007230234,0.007033038,0.000009242879,0.0000024783478,0.000038947648,0.000091532784,0.000017064287,0.00036733042],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9961021,0.0008549865,0.00013608272,0.0002470827,0.0022264542,0.0004333431],"domain_scores_gemma":[0.9830663,0.00938527,0.0039202287,0.00064625003,0.0025739258,0.00040788774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034019577,0.00037102186,0.00028075624,0.002934574,0.0013045818,0.0017071392,0.00062648073,0.0006670519,0.0008545121],"category_scores_gemma":[0.011026142,0.0004399157,0.00037418923,0.0021503596,0.0009303626,0.0011838215,0.0016140091,0.00073050306,0.0001098109],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007853175,0.0004102867,0.55625075,0.00055170164,0.00018567964,0.00844339,0.027012201,0.08223531,0.03953814,0.011229124,0.0017762671,0.27158195],"study_design_scores_gemma":[0.000030812327,0.00092538155,0.7547191,0.00034646917,0.00022590312,0.003221074,0.05448072,0.1292326,0.030613925,0.012916516,0.013007125,0.00028047603],"about_ca_topic_score_codex":0.005461009,"about_ca_topic_score_gemma":0.010307609,"teacher_disagreement_score":0.005461009,"about_ca_system_score_codex":0.0022034748,"about_ca_system_score_gemma":0.0018039752,"threshold_uncertainty_score":0.017991543},"labels":[],"label_agreement":null},{"id":"W2937976310","doi":"10.29173/mocs41","title":"Interior Glazing Systems: market analysis","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Diverse academic and cultural studies","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Glazing; Architectural engineering; Business; Interior design; Marketing; Engineering; Civil engineering","score_opus":0.01753461791650978,"score_gpt":0.195983863763844,"score_spread":0.1784492458473342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937976310","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9153492,0.0014894524,0.007382394,0.00094806857,0.000021082138,0.00031834675,0.0016878746,0.00005662939,0.07274702],"genre_scores_gemma":[0.99244964,0.00047091066,0.002147645,0.000051526993,0.000031404838,0.00010188198,0.0006585349,0.000009920203,0.004078533],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.999092,0.0003677692,0.000027138696,0.000085110696,0.00028530695,0.0001425669],"domain_scores_gemma":[0.9950919,0.0035612318,0.0006271983,0.000081477214,0.00049905374,0.00013915366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016042015,0.00022814074,0.0002704374,0.0020463588,0.00047494727,0.0016252014,0.0005042167,0.0005444846,0.020681694],"category_scores_gemma":[0.005178823,0.00014256786,0.00042910536,0.0023697342,0.00046382006,0.002670569,0.00047466808,0.0005430955,0.0009065753],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019443146,0.002128301,0.32985538,0.0014874262,0.00016297698,0.0017038638,0.010808367,0.026490608,0.009431464,0.32719472,0.023374982,0.2654176],"study_design_scores_gemma":[0.00021709307,0.0021653243,0.63214284,0.00033162272,0.0001169608,0.0009491654,0.035702404,0.16041508,0.006313529,0.06557926,0.0958205,0.00024624937],"about_ca_topic_score_codex":0.009223538,"about_ca_topic_score_gemma":0.008605139,"teacher_disagreement_score":0.020681694,"about_ca_system_score_codex":0.0018511968,"about_ca_system_score_gemma":0.00077457534,"threshold_uncertainty_score":0.069187224},"labels":[],"label_agreement":null},{"id":"W2938277272","doi":"10.29173/mocs36","title":"Investigating the effects of reduced technological constraints on cycle time through simulation modelling for automated steel wall framing","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Framing (construction); Engineering; Original equipment manufacturer; Automation; Sustainability; Construction industry; Discrete event simulation; Manufacturing engineering; Construction engineering; Architectural engineering; Computer science; Civil engineering; Mechanical engineering; Simulation","score_opus":0.010627232451389437,"score_gpt":0.22029773914141765,"score_spread":0.2096705066900282,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938277272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92901975,0.00028507464,0.054418914,0.00024609867,0.000045590714,0.00012984576,0.0005779804,0.00023176755,0.015045023],"genre_scores_gemma":[0.99196976,0.00014651414,0.005956922,0.000017002154,0.000004042188,0.00009018163,0.0001785351,0.000023954277,0.001613108],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997403,0.000084568295,0.000011781721,0.000038655468,0.00005581202,0.00006891095],"domain_scores_gemma":[0.99779224,0.00164677,0.00021970704,0.000083250656,0.00017782037,0.000080230675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054707425,0.0007819921,0.00086748524,0.000580332,0.0005809325,0.0012539738,0.00091184664,0.0015985956,0.0029137018],"category_scores_gemma":[0.002159334,0.00046902258,0.001137509,0.00055292906,0.0006824597,0.0005608019,0.0005047991,0.0009496988,0.00019577716],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025326352,0.000024620147,0.0004164544,0.000012376636,0.0000040390596,0.0000155836,0.000015255875,0.99812,0.0004497645,0.0004111769,0.000026178135,0.00047909498],"study_design_scores_gemma":[0.000007505739,0.000022209944,0.0001478357,0.0000025543202,0.0000044556973,0.0000022414697,0.000011592788,0.99919003,0.00036230922,0.0001261433,0.000119230695,0.000003918999],"about_ca_topic_score_codex":0.03138864,"about_ca_topic_score_gemma":0.014136349,"teacher_disagreement_score":0.03138864,"about_ca_system_score_codex":0.0013318761,"about_ca_system_score_gemma":0.0013322745,"threshold_uncertainty_score":0.062411904},"labels":[],"label_agreement":null},{"id":"W2938505096","doi":"10.29173/mocs24","title":"Lessons from Sweden: How Australia Can Learn from Swedish Industrialised Building","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Sustainability; Productivity; Politics; Quality (philosophy); Business; Political science; Economic growth; Geography; Economics","score_opus":0.02638576273885344,"score_gpt":0.23159322289459283,"score_spread":0.2052074601557394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938505096","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4750052,0.015679428,0.0017917763,0.10709194,0.0020111478,0.00008750716,0.00008589517,0.00008461165,0.39816248],"genre_scores_gemma":[0.8640394,0.016926564,0.0027138297,0.015217014,0.0003514888,0.00006515085,0.000120021534,0.00017615796,0.100390315],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.996707,0.0018747939,0.00010103781,0.0001884852,0.00044970767,0.00067903777],"domain_scores_gemma":[0.99795073,0.0007240718,0.00012993405,0.000117005846,0.0003521782,0.00072622043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004215734,0.0006943462,0.0005354469,0.0012831588,0.014761616,0.012172222,0.001423319,0.0025312786,0.0060620625],"category_scores_gemma":[0.0042358534,0.00045366332,0.00058214716,0.0013688711,0.006245333,0.0065549957,0.010587863,0.005746322,0.0017650393],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004848253,0.00015464627,0.0041198735,0.00033636348,0.000013799373,0.0040137256,0.8682155,0.00017845041,0.00032042048,0.033581376,0.027413785,0.061603513],"study_design_scores_gemma":[0.0000055533224,0.000054801803,0.0027052648,0.0008204286,0.000011303945,0.0006138661,0.6241243,0.0001258063,0.00018716378,0.006298819,0.3650309,0.000021877977],"about_ca_topic_score_codex":0.064253435,"about_ca_topic_score_gemma":0.19775653,"teacher_disagreement_score":0.064253435,"about_ca_system_score_codex":0.0077745677,"about_ca_system_score_gemma":0.011696074,"threshold_uncertainty_score":0.12775892},"labels":[],"label_agreement":null},{"id":"W2938571905","doi":"10.29173/mocs6","title":"Exploring the Benefits of Early Contractor Involvement (ECI) and the Mechanism for Automated 5D BIM Quantification Process in Offsite Modular Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Building information modeling; Process (computing); Process management; Activity-based costing; Deliverable; Key (lock); Construction management; Risk analysis (engineering); Government (linguistics); Modular design; Cost reduction; Construction engineering; Engineering; Project management; Systems engineering; Operations management; Business; Computer science; Computer security; Civil engineering","score_opus":0.03177847418956445,"score_gpt":0.2128911346050904,"score_spread":0.18111266041552596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938571905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6952568,0.00089565094,0.09232096,0.007641102,0.00018189834,0.000816522,0.00013767566,0.0002963875,0.2024529],"genre_scores_gemma":[0.9649696,0.00038346456,0.024231298,0.00043489123,0.000027634893,0.00019874726,0.000056354806,0.00008404213,0.009613994],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98468554,0.0078521455,0.0003380122,0.0009827148,0.0041640815,0.001977418],"domain_scores_gemma":[0.9694881,0.019019527,0.0025431851,0.0036560833,0.0032877915,0.0020053277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024696091,0.00043068535,0.00029289298,0.001022884,0.0023003926,0.008009754,0.0025786685,0.0019217316,0.014568012],"category_scores_gemma":[0.03345032,0.0007007001,0.0005524389,0.0009852313,0.0053905235,0.0091906795,0.008724274,0.0026436488,0.0014866897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020397394,0.0034095254,0.05129717,0.000979774,0.00007457617,0.0013773028,0.039020035,0.016179144,0.012383157,0.50028706,0.0060906266,0.36686185],"study_design_scores_gemma":[0.0007079342,0.007766495,0.09036094,0.003176312,0.0002826307,0.002987508,0.11802668,0.15819944,0.041688535,0.26158178,0.31457806,0.0006437223],"about_ca_topic_score_codex":0.012758492,"about_ca_topic_score_gemma":0.0127811115,"teacher_disagreement_score":0.024696091,"about_ca_system_score_codex":0.004954585,"about_ca_system_score_gemma":0.008483702,"threshold_uncertainty_score":0.13060701},"labels":[],"label_agreement":null},{"id":"W2938646736","doi":"10.29173/mocs13","title":"Measuring the Sustainable Benefits of Modular and Offsite Construction Delivery Techniques Against Conventional On-Site Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Nuclear decommissioning; Integrated project delivery; Procurement; Sustainability; Engineering; Risk analysis (engineering); Modular design; Construction engineering; Construction management; Environmental economics; Business; Civil engineering; Computer science; Waste management","score_opus":0.032048090056403036,"score_gpt":0.2495497643575795,"score_spread":0.21750167430117645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938646736","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9458406,0.00049079105,0.016510095,0.00017088535,0.000023612953,0.00027326576,0.0005067383,0.00006960535,0.036114603],"genre_scores_gemma":[0.97966695,0.0004152728,0.016585656,0.000038406983,0.0000060434163,0.0001097832,0.00040800884,0.000024353785,0.0027454898],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9942796,0.0012133324,0.00014260308,0.0002357904,0.0038079077,0.00032071132],"domain_scores_gemma":[0.99543935,0.0014088686,0.0008130483,0.0003038422,0.0018152982,0.00021957306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045125787,0.00057700375,0.00032765896,0.0034597258,0.00045950932,0.0018231388,0.0005844304,0.000510034,0.0018125165],"category_scores_gemma":[0.006159057,0.0001422383,0.00069403125,0.003204947,0.0009688658,0.0015372977,0.0018705681,0.00052311935,0.00026579836],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010454528,0.0014781512,0.35457233,0.0013111521,0.00056476175,0.00031960817,0.002408352,0.12967443,0.042191066,0.020576656,0.0031087962,0.44274926],"study_design_scores_gemma":[0.00006648427,0.0068189697,0.78107935,0.0005991676,0.00046873823,0.0004062267,0.011860447,0.12273789,0.041925155,0.0100882035,0.02371412,0.00023528608],"about_ca_topic_score_codex":0.028558284,"about_ca_topic_score_gemma":0.08837544,"teacher_disagreement_score":0.028558284,"about_ca_system_score_codex":0.004366727,"about_ca_system_score_gemma":0.0031076253,"threshold_uncertainty_score":0.056784093},"labels":[],"label_agreement":null},{"id":"W2938668898","doi":"10.29173/mocs10","title":"Production Monitoring and Process Improvement for Floor Panel Manufacturing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Installation; Process (computing); Factory (object-oriented programming); Modular design; Bridge (graph theory); Production (economics); Engineering; Production line; Computer science; Mechanical engineering","score_opus":0.011118841831716632,"score_gpt":0.2035844969300306,"score_spread":0.19246565509831398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938668898","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26535955,0.0014121307,0.7076324,0.0006890453,0.000111317895,0.0010081648,0.00036540587,0.0044337157,0.018988185],"genre_scores_gemma":[0.7973966,0.0006323148,0.1986443,0.00005247518,0.000020787646,0.00017319644,0.00031269,0.00008086947,0.0026866538],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99685234,0.0009344001,0.0001348791,0.0004259038,0.001470991,0.00018141295],"domain_scores_gemma":[0.9952305,0.0015752492,0.0007668821,0.0008281529,0.0014977646,0.000101491365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003726919,0.0007186558,0.0005430277,0.0013116953,0.00093896734,0.0017475554,0.0009701382,0.0007268071,0.0023917719],"category_scores_gemma":[0.0068984297,0.0004500761,0.0005400942,0.0012358932,0.0005026852,0.0017868774,0.00074203114,0.0006267026,0.0004484002],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071757083,0.0012321364,0.023107661,0.000656129,0.00005679287,0.00037040067,0.0011775688,0.1268781,0.06465326,0.004541303,0.0026081468,0.77400094],"study_design_scores_gemma":[0.00014890559,0.0024968265,0.050244305,0.0003023437,0.00018000438,0.00049456686,0.0013425271,0.7293242,0.17831668,0.0063696583,0.030623471,0.00015648823],"about_ca_topic_score_codex":0.0043059867,"about_ca_topic_score_gemma":0.00490559,"teacher_disagreement_score":0.0043059867,"about_ca_system_score_codex":0.0014615051,"about_ca_system_score_gemma":0.0020979354,"threshold_uncertainty_score":0.019710064},"labels":[],"label_agreement":null},{"id":"W2938673612","doi":"10.29173/mocs22","title":"Analysis framework of off-site manufacturing solutions : case study of a powerhouse complex","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Belt Conveyor Systems Engineering","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Fonds de recherche du Québec – Nature et technologies; Natural Sciences and Engineering Research Council of Canada","keywords":"Context (archaeology); Identification (biology); Engineering; Productivity; Manufacturing; Order (exchange); Systems engineering; Business; Marketing","score_opus":0.013849402515809678,"score_gpt":0.20858585384720682,"score_spread":0.19473645133139714,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938673612","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5789327,0.00133389,0.2708741,0.0029826728,0.00005007072,0.0015135045,0.00038723752,0.00014290548,0.14378294],"genre_scores_gemma":[0.91261196,0.00063558825,0.07759668,0.00008546516,0.000010978272,0.0002858598,0.00012465625,0.000023025748,0.008625734],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9977272,0.0011964397,0.000065335385,0.00018748925,0.0004398519,0.0003837067],"domain_scores_gemma":[0.9984269,0.0009201355,0.00014193455,0.00008286884,0.00025251225,0.00017551886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002342428,0.00082301395,0.00038800563,0.0023208405,0.0030640548,0.004144734,0.0017852308,0.0027424726,0.0046476396],"category_scores_gemma":[0.0020973983,0.0003709207,0.0009996602,0.001917406,0.0025131137,0.0023801134,0.0024472624,0.0013794387,0.0002886433],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002753757,0.0013170638,0.01478134,0.0006446715,0.0001141982,0.013597286,0.011580195,0.30508107,0.014736535,0.5613702,0.003899638,0.07260243],"study_design_scores_gemma":[0.00014667663,0.0007414431,0.010754554,0.00044799488,0.0001486202,0.002199364,0.04512906,0.7885854,0.009927685,0.06884959,0.0729374,0.00013221364],"about_ca_topic_score_codex":0.045235287,"about_ca_topic_score_gemma":0.054251768,"teacher_disagreement_score":0.045235287,"about_ca_system_score_codex":0.0061879265,"about_ca_system_score_gemma":0.0051497025,"threshold_uncertainty_score":0.089943945},"labels":[],"label_agreement":null},{"id":"W2938687239","doi":"10.29173/mocs29","title":"A study on small-world characteristics of Chinaäó»s high-speed railway networks","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Adjacency matrix; China; Clustering coefficient; Adjacency list; Average path length; Small-world network; Economic geography; Social network analysis; Cluster analysis; Computer science; Geography; Topology (electrical circuits); Complex network; Shortest path problem; Mathematics; Artificial intelligence; Theoretical computer science; Algorithm","score_opus":0.01590018906603718,"score_gpt":0.2412934774210046,"score_spread":0.2253932883549674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938687239","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.980604,0.00017327986,0.016232174,0.00013191013,0.0000053530803,0.00002286861,0.00024065506,0.000026274458,0.0025635492],"genre_scores_gemma":[0.99834716,0.000095101896,0.0011695425,0.000003432369,0.0000028956142,0.000008853737,0.00014543023,0.0000019749727,0.00022562599],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99981374,0.000065368265,0.000009504992,0.00004219925,0.000039309274,0.000029833223],"domain_scores_gemma":[0.99800366,0.0011275547,0.00033016744,0.00012464792,0.00027846778,0.00013548507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054516696,0.00018810906,0.00013904482,0.0018040866,0.0004959473,0.0006702659,0.00026696283,0.00023093524,0.0010066475],"category_scores_gemma":[0.0027281735,0.00011587999,0.00031264115,0.0020228848,0.00040326887,0.001853315,0.00031657843,0.00017957453,0.000050633607],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015108264,0.00012474491,0.52625746,0.00029910612,0.0002489914,0.0015477074,0.002426634,0.3034667,0.007157178,0.06987003,0.002624435,0.08582582],"study_design_scores_gemma":[0.00001022684,0.00010501335,0.30481368,0.00002796357,0.000106448795,0.00051259017,0.001560475,0.67187667,0.001986066,0.014704497,0.0042634476,0.00003291974],"about_ca_topic_score_codex":0.014005043,"about_ca_topic_score_gemma":0.01302225,"teacher_disagreement_score":0.014005043,"about_ca_system_score_codex":0.0009185524,"about_ca_system_score_gemma":0.0004561061,"threshold_uncertainty_score":0.027847052},"labels":[],"label_agreement":null},{"id":"W2938778003","doi":"10.29173/mocs16","title":"Improving Efficiency of Underground Heat Storage Systems","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Geothermal Energy Systems and Applications","field":"Energy","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Thermal energy storage; Environmental science; Renewable heat; Renewable energy; Energy storage; Soil water; Cogeneration; Electricity; Fossil fuel; Waste management; Moisture; Electricity generation; Environmental engineering; Waste heat; Engineering; Meteorology; Mechanical engineering; Electrical engineering; Geography; Hybrid heat; Soil science","score_opus":0.00767060666890532,"score_gpt":0.19059536210181013,"score_spread":0.18292475543290482,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938778003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.726646,0.0015919876,0.22772123,0.0004391211,0.0001509232,0.00014775785,0.00047443894,0.0024125131,0.040416077],"genre_scores_gemma":[0.9876511,0.00031063845,0.008047807,0.000017830665,0.000010120886,0.00001856081,0.00012367203,0.0000832625,0.003737005],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995925,0.00006698374,0.00002978475,0.00006014935,0.0001601456,0.00009046009],"domain_scores_gemma":[0.9995016,0.00015516956,0.000047040157,0.00009680517,0.00017287812,0.000026535321],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004134296,0.0005105401,0.00041187814,0.0006678079,0.00038931964,0.0011998112,0.0010517406,0.0003721047,0.0059983963],"category_scores_gemma":[0.0010082436,0.00021429294,0.00040889397,0.000696766,0.00030673633,0.0015946849,0.00079324516,0.0003538015,0.0013485735],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072389585,0.0003963714,0.020880211,0.00085331826,0.00012531003,0.0005150466,0.0006414454,0.32810733,0.20859034,0.023865122,0.005474356,0.40982723],"study_design_scores_gemma":[0.00009995642,0.00071388815,0.014441444,0.00015971727,0.00016192932,0.00030791547,0.00072764413,0.6767753,0.26391807,0.007034161,0.035581976,0.000078042074],"about_ca_topic_score_codex":0.002484593,"about_ca_topic_score_gemma":0.0027964541,"teacher_disagreement_score":0.0059983963,"about_ca_system_score_codex":0.0009453172,"about_ca_system_score_gemma":0.00045876898,"threshold_uncertainty_score":0.020066679},"labels":[],"label_agreement":null},{"id":"W2938817717","doi":"10.29173/mocs3","title":"Industrializing Korean Traditional Housing (Hanok) with Hybrid Timber Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Color perception and design","field":"Psychology","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Transport and Maritime Affairs; National Research Foundation of Korea; Ministry of Science, ICT and Future Planning; National Research Foundation","keywords":"Industrialisation; Modular design; Government (linguistics); Architectural engineering; Order (exchange); Frame (networking); Engineering; Dissemination; Computer science; Engineering management; Business; Telecommunications","score_opus":0.0388135942692387,"score_gpt":0.2428050893411741,"score_spread":0.2039914950719354,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938817717","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8608664,0.00053878134,0.09965871,0.00011977687,0.000068721085,0.00038699474,0.00013721659,0.00029604178,0.03792734],"genre_scores_gemma":[0.8188933,0.0005855908,0.16688575,0.00004965057,0.000008689139,0.00011997262,0.00030059632,0.00007083727,0.0130856205],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9998023,0.000035522116,0.000010342683,0.000034418546,0.00007581687,0.000041638697],"domain_scores_gemma":[0.9999118,0.000007693215,0.000008785106,0.000027910755,0.00002682585,0.000016962147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045872614,0.00044471835,0.00013167948,0.00043259104,0.00051629636,0.0007637994,0.0006014368,0.00023148813,0.0035038833],"category_scores_gemma":[0.00019435413,0.00019676451,0.00031890275,0.00054120034,0.00036141137,0.000754515,0.0013861365,0.00023261651,0.00075302407],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049235206,0.0008686359,0.050354574,0.0010759,0.000077160395,0.002869369,0.0063797846,0.019304529,0.22874252,0.02870194,0.005205586,0.6559276],"study_design_scores_gemma":[0.00029964134,0.0063980054,0.20571129,0.00052311807,0.00044443112,0.006521202,0.021292198,0.111904636,0.19726503,0.009951969,0.43943885,0.00024953732],"about_ca_topic_score_codex":0.0020288068,"about_ca_topic_score_gemma":0.007971654,"teacher_disagreement_score":0.0035038833,"about_ca_system_score_codex":0.00026441627,"about_ca_system_score_gemma":0.00047441357,"threshold_uncertainty_score":0.011721671},"labels":[],"label_agreement":null},{"id":"W2938916722","doi":"10.29173/mocs47","title":"Construction Capacity and New Housing Demand Caused by Tornados","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Tornado; Damages; Procurement; Census; Construction industry; Business; Geography; Engineering; Construction engineering; Meteorology; Population; Political science","score_opus":0.02250196875849504,"score_gpt":0.19076713690669994,"score_spread":0.1682651681482049,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938916722","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9975575,0.000037476384,0.00014720658,0.00012222934,0.0000065541776,0.0000054963843,0.0009376427,0.0000055072146,0.0011802905],"genre_scores_gemma":[0.99886656,0.00003679274,0.000040219682,0.000009269114,0.000006415644,0.00000544686,0.0006695722,0.0000020489524,0.00036366566],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996817,0.000050020386,0.00003086296,0.000044753055,0.00008019914,0.00011245081],"domain_scores_gemma":[0.9977144,0.0004943532,0.001090366,0.000093140974,0.00032263726,0.00028499778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036251283,0.00027699803,0.0002134296,0.000893403,0.00041092923,0.0009883068,0.00048981764,0.00044623966,0.004247609],"category_scores_gemma":[0.0023158598,0.000261895,0.00034138552,0.00097371725,0.000418281,0.00084153214,0.00068511907,0.0006044613,0.00035387994],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020638187,0.00013422406,0.97382075,0.00005101922,0.00006409731,0.00078746694,0.0005832568,0.015957305,0.00089966285,0.00087660196,0.0014679158,0.005151243],"study_design_scores_gemma":[0.000004961282,0.00005540849,0.9834284,0.00001845285,0.000014301244,0.00018106912,0.003223404,0.010845188,0.0003437514,0.00035455264,0.0015096708,0.000020905512],"about_ca_topic_score_codex":0.03810624,"about_ca_topic_score_gemma":0.06259422,"teacher_disagreement_score":0.03810624,"about_ca_system_score_codex":0.002148295,"about_ca_system_score_gemma":0.00045521738,"threshold_uncertainty_score":0.07576889},"labels":[],"label_agreement":null},{"id":"W2938947177","doi":"10.29173/mocs26","title":"Designing for Pre-Fabrication and Assembly in the Construction of UBCäó»s Tall Wood Building","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Procurement; Context (archaeology); Key (lock); Process (computing); Integrated project delivery; Engineering; Software deployment; Project team; Engineering design process; Construction engineering; Systems engineering; Computer science; Project management; Software engineering; Mechanical engineering; Operations management; Business","score_opus":0.00836181900101695,"score_gpt":0.211949529487032,"score_spread":0.20358771048601504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938947177","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68854475,0.0006876951,0.15762511,0.0011284552,0.00007555912,0.0006312451,0.000058244295,0.00081886054,0.15043001],"genre_scores_gemma":[0.7902534,0.0003366595,0.17267032,0.00009708015,0.000009383536,0.000100569065,0.000053581214,0.00013986288,0.036339138],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99807775,0.00069687044,0.000052967374,0.000120675286,0.00078186963,0.00026997123],"domain_scores_gemma":[0.99912065,0.0003517033,0.0000641564,0.000120043296,0.0001895202,0.00015394077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023595148,0.00046741206,0.00019132491,0.0007745089,0.0042899046,0.004012547,0.0009553895,0.0010116902,0.004029419],"category_scores_gemma":[0.0023221015,0.0006795271,0.00024745738,0.00046738036,0.0022774597,0.0011561821,0.0012726046,0.0012060129,0.0006511137],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004488209,0.0007522826,0.021421399,0.00060468714,0.000028975503,0.0054835626,0.039241657,0.098591715,0.113119856,0.113380454,0.009209213,0.59771734],"study_design_scores_gemma":[0.00013002452,0.003105428,0.08086677,0.0007093233,0.0001784102,0.0076766214,0.091620974,0.22732659,0.12867355,0.03370084,0.4254967,0.000514724],"about_ca_topic_score_codex":0.03594295,"about_ca_topic_score_gemma":0.1376668,"teacher_disagreement_score":0.03594295,"about_ca_system_score_codex":0.003107374,"about_ca_system_score_gemma":0.005734967,"threshold_uncertainty_score":0.07146746},"labels":[],"label_agreement":null},{"id":"W2938965000","doi":"10.29173/mocs25","title":"Detailed Analysis of Texasäó»s Manufactured Housing Growth and Competition","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Housing Market and Economics","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Harvard University; U.S. Department of Housing and Urban Development","keywords":"License; Competition (biology); Product (mathematics); Business; Production (economics); Supply and demand; Industrial organization; Marketing; Economics; Computer science","score_opus":0.010757113541305032,"score_gpt":0.17898864751147303,"score_spread":0.168231533970168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938965000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.993005,0.000061547624,0.00037138644,0.00010473647,0.0000024317285,0.000010090536,0.0030729293,0.0000071501045,0.0033646736],"genre_scores_gemma":[0.9912252,0.00008865003,0.0003165906,0.000013581809,0.00000690719,0.000013279478,0.00523559,0.0000032963405,0.0030970096],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99980074,0.00001893892,0.0000124834805,0.000036422825,0.000078950856,0.000052523646],"domain_scores_gemma":[0.9987367,0.00035120538,0.00046505284,0.000041430063,0.0002889295,0.00011667451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034291157,0.00012548844,0.00013194028,0.0015962411,0.0003447398,0.00089855085,0.00021660456,0.0001688964,0.0030976303],"category_scores_gemma":[0.0011397765,0.000078096135,0.000195557,0.0021705055,0.000226042,0.0007282381,0.0004132212,0.00035237262,0.00030708013],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010547344,0.000093467825,0.9617381,0.00007192883,0.000039118742,0.0004364496,0.0016319961,0.0045362245,0.0019498472,0.0049913083,0.00426905,0.020136984],"study_design_scores_gemma":[0.0000013895572,0.00006445707,0.98677605,0.000011786121,0.0000062289887,0.00007667076,0.002463337,0.0054320702,0.00044757032,0.00026742637,0.004444841,0.0000081100125],"about_ca_topic_score_codex":0.042278867,"about_ca_topic_score_gemma":0.089458466,"teacher_disagreement_score":0.042278867,"about_ca_system_score_codex":0.0015741806,"about_ca_system_score_gemma":0.00088759937,"threshold_uncertainty_score":0.08406556},"labels":[],"label_agreement":null},{"id":"W2939040710","doi":"10.29173/mocs19","title":"Applying the Flow-interception Location Model to Select the Location of Construction Industrial Yard","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Yard; Industrialisation; Material flow; Heuristic; Engineering; Transport engineering; Operations research; Civil engineering; Computer science; Economics","score_opus":0.015984891539291328,"score_gpt":0.20169534886597545,"score_spread":0.18571045732668412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939040710","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041940298,0.0002305797,0.95053756,0.000327112,0.00006393661,0.0001464427,0.0003373052,0.00033204586,0.006084782],"genre_scores_gemma":[0.8324578,0.00061028823,0.15394437,0.00007509455,0.000042767184,0.00044208413,0.0009401085,0.000057713216,0.011429745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934477,0.00015392392,0.000034938996,0.000220469,0.00011273059,0.00013328159],"domain_scores_gemma":[0.99949145,0.0002094551,0.000081915845,0.000028251747,0.0001368645,0.00005199524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009283774,0.0010311857,0.0010295787,0.0013999722,0.0008263072,0.0021917152,0.002503413,0.0016503611,0.00469146],"category_scores_gemma":[0.0015911964,0.00067914254,0.0015536131,0.0018276811,0.00073427014,0.002190019,0.001333556,0.0008877372,0.0006700375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003503004,0.00003415731,0.0022048717,0.000044570224,0.000017427255,0.000084352585,0.0000670467,0.9723584,0.0004829326,0.009217827,0.00064269657,0.014810703],"study_design_scores_gemma":[0.000009485053,0.000025262909,0.0002609858,0.000006074048,0.000013124637,0.000018965451,0.00003065494,0.9963568,0.00013703824,0.002520615,0.0006097164,0.0000112119515],"about_ca_topic_score_codex":0.038840663,"about_ca_topic_score_gemma":0.024120886,"teacher_disagreement_score":0.038840663,"about_ca_system_score_codex":0.002333932,"about_ca_system_score_gemma":0.0028333946,"threshold_uncertainty_score":0.07722914},"labels":[],"label_agreement":null},{"id":"W2939173706","doi":"10.29173/mocs34","title":"Modular Industry Characteristics and Barriers to its Increased Market Share","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Work (physics); Engineering; Construction management; Business; Engineering management; Architectural engineering; Operations management; Construction engineering; Civil engineering; Marketing; Computer science","score_opus":0.0062029935869639735,"score_gpt":0.19105715839627652,"score_spread":0.18485416480931255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939173706","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.976583,0.00008086271,0.0002770952,0.00045738113,0.00000431859,0.000036295234,0.0001312381,0.000009572844,0.022420349],"genre_scores_gemma":[0.99678695,0.00006436746,0.00012802023,0.00003648816,0.000007530311,0.000009519368,0.00008907097,0.000005458355,0.0028725863],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979038,0.00021254408,0.00007459946,0.00019767688,0.0009665946,0.0006448658],"domain_scores_gemma":[0.9901073,0.002578076,0.0030094,0.0003411743,0.001786245,0.0021777186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001931654,0.00010896609,0.00014703347,0.0019354692,0.00082779117,0.0023158411,0.0006525142,0.00047984763,0.017224824],"category_scores_gemma":[0.007151438,0.00016008143,0.00023997863,0.0018140656,0.00095059816,0.0014768322,0.0015193137,0.0006101034,0.001016473],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028177467,0.00049232395,0.9167467,0.00011290551,0.000022797218,0.0011271912,0.008668021,0.0007320667,0.0049510165,0.016560232,0.004029793,0.046275254],"study_design_scores_gemma":[0.000013510005,0.00012431736,0.9686992,0.00004437955,0.00000660236,0.000260421,0.011873486,0.0010861022,0.00070970855,0.0007480402,0.016414713,0.000019472673],"about_ca_topic_score_codex":0.026294822,"about_ca_topic_score_gemma":0.052863248,"teacher_disagreement_score":0.026294822,"about_ca_system_score_codex":0.002525971,"about_ca_system_score_gemma":0.0026122313,"threshold_uncertainty_score":0.05762273},"labels":[],"label_agreement":null},{"id":"W2939188798","doi":"10.29173/mocs27","title":"3D Motion-based Ergonomic and Body Posture Analysis in Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Work (physics); Human factors and ergonomics; Animation; Body posture; Risk analysis (engineering); Body segment; Computer science; Human body; Motion (physics); Engineering; Poison control; Physical medicine and rehabilitation; Mechanical engineering; Business; Artificial intelligence","score_opus":0.01838738150421708,"score_gpt":0.32937526458982647,"score_spread":0.3109878830856094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939188798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6727046,0.00040987285,0.32207394,0.0001377897,0.0000341583,0.00014501331,0.00044293908,0.0005554803,0.0034962043],"genre_scores_gemma":[0.94515276,0.00024452954,0.05320213,0.000022485938,0.000009275132,0.000060988496,0.00025546784,0.000042359017,0.0010099295],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9998049,0.00006790477,0.000008925655,0.000031577358,0.000068278685,0.000018417857],"domain_scores_gemma":[0.99979836,0.00008245908,0.00003928536,0.000022836652,0.000039114144,0.000017943521],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034245386,0.00034186494,0.00022287043,0.001497168,0.00019100867,0.0005098177,0.0002497056,0.00046334282,0.0013175777],"category_scores_gemma":[0.00088521506,0.00029832002,0.00043543565,0.0005669168,0.0003103157,0.00024873542,0.0005614201,0.0001715148,0.00028230145],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084759033,0.00030236263,0.07997805,0.00047846348,0.00015677573,0.0008991328,0.0022182537,0.30930924,0.16666535,0.0019860265,0.0016819638,0.4354768],"study_design_scores_gemma":[0.000024288101,0.00040083108,0.28131232,0.00012643986,0.000056850862,0.0008069321,0.001057012,0.697663,0.013267243,0.0018033573,0.003399586,0.00008217781],"about_ca_topic_score_codex":0.005001475,"about_ca_topic_score_gemma":0.0060352553,"teacher_disagreement_score":0.005001475,"about_ca_system_score_codex":0.00022871724,"about_ca_system_score_gemma":0.0002992615,"threshold_uncertainty_score":0.009944737},"labels":[],"label_agreement":null},{"id":"W2939569709","doi":"10.29173/mocs31","title":"Prefabricated Prefinished Volumetric Construction Joining Tech-niques Review","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation Singapore; National University of Singapore; National Research Foundation; Sembcorp Industries","keywords":"Constructability; Modular design; Computer science; Construction engineering; Engineering; Systems engineering","score_opus":0.008341770775595862,"score_gpt":0.19376896497600243,"score_spread":0.18542719420040657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939569709","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062262965,0.95675653,0.012019134,0.00028356106,0.0005473415,0.000074056734,0.00006851833,0.000065252956,0.023959309],"genre_scores_gemma":[0.032014996,0.9463419,0.011362741,0.00016817132,0.0003550804,0.0000737245,0.00026450751,0.000041502833,0.009377289],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988788,0.00010793893,0.00010203229,0.00015635934,0.000676083,0.000078757046],"domain_scores_gemma":[0.99865735,0.00051994255,0.00025452013,0.00008500563,0.00044706368,0.000036145102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013075287,0.0007649744,0.000818001,0.0025287336,0.0003512363,0.0013526381,0.0012714396,0.0011361353,0.005001202],"category_scores_gemma":[0.0014940802,0.00049812335,0.00060732587,0.003173218,0.0005818548,0.0017054189,0.0006908028,0.00094787916,0.0027839323],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049521033,0.00011850171,0.00032955216,0.0115262745,0.000039486655,0.00017527671,0.00013569895,0.0033205468,0.009608751,0.011038657,0.008052517,0.95560515],"study_design_scores_gemma":[0.0000070993115,0.00025143276,0.0014423726,0.0020946309,0.000064542364,0.001402804,0.00013369841,0.0008761666,0.015113666,0.0020730519,0.9765053,0.00003522479],"about_ca_topic_score_codex":0.0013669989,"about_ca_topic_score_gemma":0.0017178489,"teacher_disagreement_score":0.005001202,"about_ca_system_score_codex":0.0006650428,"about_ca_system_score_gemma":0.0011214238,"threshold_uncertainty_score":0.016730726},"labels":[],"label_agreement":null},{"id":"W2939661797","doi":"10.29173/mocs68","title":"Energy optimization in modular buildings made from 3d printing","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Installation; Architectural engineering; Civil engineering; Energy consumption; Process (computing); 3D printing; Engineering; Modular construction; Construction engineering; Computer science; Mechanical engineering","score_opus":0.007495833135433317,"score_gpt":0.19603840853898774,"score_spread":0.18854257540355443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939661797","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94961786,0.00021702124,0.037922345,0.00005582482,0.000017777835,0.000024608373,0.000163041,0.00010366324,0.011877893],"genre_scores_gemma":[0.9952513,0.00006126543,0.0037005811,0.000004398651,0.0000010254179,0.000011948179,0.000040501895,0.000016851529,0.00091207214],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999062,0.000025117395,0.0000036303945,0.000013795761,0.000026742327,0.000024572035],"domain_scores_gemma":[0.9998653,0.0000808433,0.00001713874,0.000014601039,0.000013491576,0.000008586095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019561237,0.00039604702,0.00044180808,0.00042787998,0.00020050361,0.0006641162,0.0002984429,0.00043684503,0.0018457965],"category_scores_gemma":[0.00035681055,0.00023269393,0.0008096706,0.00051351625,0.00030784225,0.00033431684,0.0003878843,0.00020366919,0.0001596059],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074098105,0.000029126135,0.00079717604,0.000029901958,0.000008652793,0.00008101411,0.00001069858,0.98855025,0.004943321,0.0004207306,0.00006034592,0.00499463],"study_design_scores_gemma":[0.000016316377,0.00015690144,0.0030845564,0.0000063558236,0.000019114856,0.000038737922,0.00004034134,0.9896568,0.0058633927,0.0006536012,0.00045011018,0.000013863979],"about_ca_topic_score_codex":0.0029568737,"about_ca_topic_score_gemma":0.0040423027,"teacher_disagreement_score":0.0029568737,"about_ca_system_score_codex":0.0005029859,"about_ca_system_score_gemma":0.00021675353,"threshold_uncertainty_score":0.0061748624},"labels":[],"label_agreement":null},{"id":"W2939777093","doi":"10.29173/mocs35","title":"A BIM-based Supply Chain Integration for Prefabrication and Modularization","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Prefabrication; Supply chain; Schedule; Modular programming; Integrated project delivery; Precast concrete; Process (computing); Building information modeling; Manufacturing engineering; Systems engineering; Transport engineering; Computer science; Engineering; Operations management; Business; Civil engineering; Project management; Scheduling (production processes)","score_opus":0.006861548457437031,"score_gpt":0.1943483338728542,"score_spread":0.18748678541541716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939777093","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066526034,0.0001534918,0.9788286,0.0001924574,0.0000747682,0.00032064167,0.00018570153,0.0012871918,0.012304583],"genre_scores_gemma":[0.079689,0.00036417137,0.9116128,0.00006106932,0.000019459469,0.00036164073,0.0006992857,0.00015940299,0.007033083],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975764,0.0005712218,0.00013823502,0.0002914829,0.0012833972,0.00013935378],"domain_scores_gemma":[0.99915123,0.0001230668,0.000083192106,0.00017547808,0.00041247677,0.000054638742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002352303,0.0009745056,0.0005633947,0.0024579428,0.0012050569,0.0027167741,0.0013375016,0.000918324,0.00542076],"category_scores_gemma":[0.0022666126,0.00076583546,0.0010418454,0.0030993961,0.0005593152,0.0021878986,0.002423934,0.001136798,0.0016613251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000098294855,0.0004669571,0.0029956235,0.00032087983,0.00010235944,0.00048174316,0.0008807402,0.25103736,0.025074227,0.08705034,0.010050607,0.62144095],"study_design_scores_gemma":[0.00003738373,0.00025682963,0.0028205295,0.00015810973,0.000075009746,0.00048478943,0.0003986748,0.83814734,0.025061518,0.01924914,0.11320883,0.000101738784],"about_ca_topic_score_codex":0.005819055,"about_ca_topic_score_gemma":0.006118778,"teacher_disagreement_score":0.005819055,"about_ca_system_score_codex":0.0015513352,"about_ca_system_score_gemma":0.0037447196,"threshold_uncertainty_score":0.018134296},"labels":[],"label_agreement":null},{"id":"W2939869739","doi":"10.29173/mocs46","title":"Addressing the Impact of Industrialized Components on the Cost of Temporary Heating in Cold-climate Regions","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuel efficiency; Schedule; Context (archaeology); Consumption (sociology); Cost estimate; Environmental science; Building envelope; Envelope (radar); Environmental economics; Engineering; Computer science; Meteorology; Automotive engineering; Economics; Telecommunications; Geography","score_opus":0.06484120816958823,"score_gpt":0.274656107593629,"score_spread":0.2098148994240408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939869739","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913551,0.00015547166,0.0038158898,0.000074096046,0.000005396412,0.000036552883,0.0003057761,0.000021975058,0.004229672],"genre_scores_gemma":[0.99816126,0.00012911092,0.0011447526,0.000004084132,0.0000010277591,0.000009622919,0.00013624495,0.000005005844,0.000408883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996723,0.000092691684,0.0000073642864,0.000031805328,0.000072819785,0.00012306524],"domain_scores_gemma":[0.9993449,0.00036469445,0.000091695394,0.000029588391,0.00013038485,0.000038735405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005278171,0.0005852384,0.0002892593,0.0006328422,0.00042907876,0.0013583823,0.0009050614,0.00065146905,0.0012734291],"category_scores_gemma":[0.0012997617,0.00023745907,0.0006345335,0.0013343545,0.00043270446,0.0007474494,0.00046264613,0.00048527305,0.00009172629],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016688232,0.0001026357,0.030577201,0.00007054828,0.000038993956,0.00031446654,0.00008561789,0.9557546,0.0018453401,0.0022755845,0.00022357532,0.008544558],"study_design_scores_gemma":[0.000026821312,0.00027787234,0.09118085,0.000031817366,0.00009970136,0.000092943585,0.0015676187,0.8991786,0.005201007,0.0009077372,0.0013942942,0.000040751303],"about_ca_topic_score_codex":0.3144555,"about_ca_topic_score_gemma":0.3257825,"teacher_disagreement_score":0.3144555,"about_ca_system_score_codex":0.0049662967,"about_ca_system_score_gemma":0.002973842,"threshold_uncertainty_score":0.62525034},"labels":[],"label_agreement":null},{"id":"W2939946541","doi":"10.29173/mocs45","title":"Outcomes of the State-of-the-art Symposium: status, challenges and future directions of offsite construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Florida","keywords":"Bridge (graph theory); Modular design; Strengths and weaknesses; Construction industry; Economic shortage; Engineering; State (computer science); Factory (object-oriented programming); Adaptation (eye); Engineering management; Construction engineering; Architectural engineering; Business; Computer science","score_opus":0.005838141790964833,"score_gpt":0.18620917534503773,"score_spread":0.18037103355407288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939946541","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27914318,0.08229743,0.02184652,0.33274058,0.034008414,0.00051179103,0.0015798619,0.00070791796,0.24716432],"genre_scores_gemma":[0.7956211,0.0547682,0.015891537,0.014118564,0.008379288,0.000339114,0.002735182,0.0004232789,0.10772377],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99270356,0.0020610008,0.00028327855,0.00049282075,0.0029511577,0.0015081378],"domain_scores_gemma":[0.98882324,0.0023872284,0.0007455875,0.00057919184,0.004112573,0.0033521312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017661687,0.00084472564,0.0004849475,0.002041967,0.0039120913,0.009386589,0.0016654958,0.0030171203,0.0130207725],"category_scores_gemma":[0.010812302,0.00031034203,0.0007779959,0.0022796341,0.0030730944,0.005035172,0.009511985,0.004588324,0.0021843517],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045131514,0.0008832151,0.017444527,0.002199743,0.00005898737,0.00096414244,0.026819399,0.0016094829,0.007003384,0.048664328,0.3724438,0.5214577],"study_design_scores_gemma":[0.000011911436,0.00037552734,0.025798999,0.0014323826,0.0000294177,0.00042816057,0.03354094,0.0007307781,0.0030353372,0.0060713603,0.9284555,0.000089697314],"about_ca_topic_score_codex":0.0047977916,"about_ca_topic_score_gemma":0.014450724,"teacher_disagreement_score":0.017661687,"about_ca_system_score_codex":0.004393375,"about_ca_system_score_gemma":0.008024598,"threshold_uncertainty_score":0.09340507},"labels":[],"label_agreement":null},{"id":"W2939960144","doi":"10.29173/mocs62","title":"Key technologies for prefabricated timber buildings","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Architectural engineering; Key (lock); Process (computing); Engineering; Construction engineering; Civil engineering; Computer science; Computer security","score_opus":0.012269259508668503,"score_gpt":0.2058532023226092,"score_spread":0.1935839428139407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939960144","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.073162146,0.05626119,0.39696676,0.0029312365,0.0009881523,0.0006764962,0.00048528015,0.0007529183,0.46777576],"genre_scores_gemma":[0.5572076,0.060592324,0.2637984,0.0004502489,0.00052753254,0.0004970316,0.00067090854,0.00013362952,0.11612236],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996087,0.000047566537,0.000028595705,0.00006762824,0.00018769276,0.000059878694],"domain_scores_gemma":[0.9998574,0.00003445056,0.000024981393,0.000029026165,0.000038944563,0.000015056306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003452782,0.00053817255,0.0002409581,0.0016613116,0.0009131691,0.0018778695,0.0007605449,0.000976208,0.010540976],"category_scores_gemma":[0.00034073798,0.00031871433,0.00038489632,0.0017027225,0.0010129103,0.0027876138,0.0012391596,0.00084114505,0.0026330035],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046647663,0.00007442995,0.0012582162,0.0015108195,0.000012986565,0.0013124343,0.0018491249,0.0050601675,0.05930068,0.5094761,0.006439957,0.41365838],"study_design_scores_gemma":[0.000015253374,0.00019940088,0.0040561664,0.0006259889,0.00003508013,0.0029485356,0.0014702592,0.008241989,0.033171218,0.126232,0.82293844,0.00006574553],"about_ca_topic_score_codex":0.00089826755,"about_ca_topic_score_gemma":0.001401597,"teacher_disagreement_score":0.010540976,"about_ca_system_score_codex":0.0010840575,"about_ca_system_score_gemma":0.0008259274,"threshold_uncertainty_score":0.035263002},"labels":[],"label_agreement":null},{"id":"W2940064139","doi":"10.29173/mocs21","title":"Polymer-based Modular Residential Building Design and Construction äóñ A new Paradigm?","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Natural Fiber Reinforced Composites","field":"Materials Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Sandwich-structured composite; Sandwich panel; Rigidity (electromagnetism); Embodied energy; Architectural engineering; Composite number; Engineering; Materials science; Computer science; Composite material","score_opus":0.010961673426283793,"score_gpt":0.21625369472763784,"score_spread":0.20529202130135404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940064139","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10466442,0.40969267,0.23909774,0.018537473,0.0044815848,0.00010070476,0.00020476426,0.0006117908,0.2226089],"genre_scores_gemma":[0.42838538,0.34542483,0.13863912,0.0033271823,0.0012472599,0.00014622322,0.00017262249,0.00017731574,0.082480185],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99989307,0.000024984498,0.0000043053915,0.000024819567,0.000035130313,0.0000176284],"domain_scores_gemma":[0.99995506,0.000007804388,0.000010035579,0.000007696578,0.000010484029,0.000008930248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002797337,0.00032412363,0.00029691518,0.0002806216,0.00018053786,0.00085897464,0.00047350526,0.00062564417,0.0052585816],"category_scores_gemma":[0.00016314999,0.00017215115,0.0002609021,0.0003485418,0.0006521953,0.0019508483,0.0005119145,0.00061239523,0.0016481339],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000643882,0.000110261215,0.00050194,0.0025503105,0.000038427384,0.00023514296,0.00029013163,0.008232176,0.06370674,0.37950003,0.010918949,0.5338515],"study_design_scores_gemma":[0.000009014989,0.00030701046,0.00080505165,0.00041850013,0.000031235817,0.00063640927,0.0003487107,0.0036245466,0.019597664,0.0526366,0.92155874,0.00002651761],"about_ca_topic_score_codex":0.00029404517,"about_ca_topic_score_gemma":0.0010017286,"teacher_disagreement_score":0.0052585816,"about_ca_system_score_codex":0.0004722911,"about_ca_system_score_gemma":0.0003997826,"threshold_uncertainty_score":0.017591715},"labels":[],"label_agreement":null},{"id":"W2940100037","doi":"10.29173/mocs37","title":"IoT-based Inventory Control System Framework for Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Schedule; Modular design; Computer science; Control (management); Inventory control; Frame (networking); Internet of Things; Production (economics); Systems engineering; Operations research; Engineering; Civil engineering; Computer security","score_opus":0.008280878571245565,"score_gpt":0.20135190700173664,"score_spread":0.19307102843049107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940100037","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035526669,0.00024052591,0.9815424,0.00020533716,0.00010604341,0.000364305,0.00016746939,0.0027944073,0.011026865],"genre_scores_gemma":[0.52235425,0.0009786312,0.45509142,0.00029612487,0.00013281254,0.0016701126,0.0013477769,0.00024298132,0.01788599],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99942195,0.00009607441,0.00006682086,0.000113820905,0.00024486572,0.000056492594],"domain_scores_gemma":[0.9997782,0.00004062145,0.000028919507,0.000026718866,0.00009667906,0.000028845496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092640024,0.000626281,0.0005350171,0.00085122645,0.00076481915,0.0023675864,0.0020318774,0.0010204045,0.004540147],"category_scores_gemma":[0.000616175,0.000320254,0.00086272036,0.0005217825,0.0007788697,0.0015300243,0.001128595,0.0010554157,0.001029313],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027783512,0.00032508682,0.0027044145,0.00066631235,0.00014540134,0.002382812,0.0010295191,0.4609106,0.03322108,0.33588582,0.016760657,0.14569049],"study_design_scores_gemma":[0.00003826458,0.0000939115,0.00055121316,0.000087209926,0.000038804053,0.00019468083,0.00011193726,0.93756795,0.0044548227,0.0126136355,0.04420245,0.000045168897],"about_ca_topic_score_codex":0.011949303,"about_ca_topic_score_gemma":0.008909219,"teacher_disagreement_score":0.011949303,"about_ca_system_score_codex":0.001195716,"about_ca_system_score_gemma":0.0016760405,"threshold_uncertainty_score":0.023759484},"labels":[],"label_agreement":null},{"id":"W2940167186","doi":"10.29173/mocs4","title":"Prefabricated Timber Concrete Composite Floors","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Berner Fachhochschule; University of British Columbia; FPInnovations; Kommission für Technologie und Innovation","keywords":"Precast concrete; Formwork; Modular design; Cross laminated timber; Composite number; Civil engineering; Structural engineering; Embodied energy; Stiffness; Architectural engineering; Engineering; Environmental science; Computer science; Forensic engineering","score_opus":0.006884388953598168,"score_gpt":0.17029880199886646,"score_spread":0.1634144130452683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940167186","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8805393,0.0013721329,0.070567444,0.00007520389,0.0003786738,0.00021765823,0.0010051465,0.0013164149,0.044528093],"genre_scores_gemma":[0.9278196,0.00054574624,0.045247637,0.000037999056,0.000023117109,0.000050426246,0.00063486054,0.00007603483,0.025564615],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998896,0.0000042755073,0.000005883293,0.000016285616,0.000059372025,0.000024584988],"domain_scores_gemma":[0.9998596,0.000014810845,0.000028726225,0.000022869628,0.00004525506,0.000028699253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010895071,0.00035354457,0.00010529655,0.00029345648,0.00015564702,0.00023419723,0.0002449541,0.0002326052,0.0070081246],"category_scores_gemma":[0.00016629133,0.00012875543,0.00013376102,0.00019798873,0.00012125607,0.000119850425,0.00017709078,0.0003668605,0.0014985593],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090325986,0.00006124937,0.0010226012,0.00019323795,0.0000062888794,0.0003817648,0.000071819246,0.003186835,0.9408861,0.0014357261,0.0010546346,0.05160954],"study_design_scores_gemma":[0.00003487886,0.0012525747,0.032131054,0.00007730011,0.000032916458,0.0017868215,0.00020915463,0.0065761073,0.8427692,0.0005512699,0.11453488,0.00004388512],"about_ca_topic_score_codex":0.0008476574,"about_ca_topic_score_gemma":0.0028802033,"teacher_disagreement_score":0.0070081246,"about_ca_system_score_codex":0.00010097306,"about_ca_system_score_gemma":0.00023715859,"threshold_uncertainty_score":0.023444533},"labels":[],"label_agreement":null},{"id":"W2940231597","doi":"10.29173/mocs54","title":"Design and static behavior of beam-to-beam-tied connection for modular steel buildings","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Key Research and Development Program of China; National Science Foundation","keywords":"Structural engineering; Connection (principal bundle); Modular design; Diagonal; Beam (structure); Engineering; Computer science; Geometry; Mathematics","score_opus":0.015229061714965273,"score_gpt":0.2252084719210123,"score_spread":0.20997941020604702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940231597","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92800575,0.0001862015,0.06520438,0.00004933293,0.00003893077,0.00005094089,0.000071317736,0.00039089838,0.0060022264],"genre_scores_gemma":[0.99105513,0.000036545378,0.007802622,0.0000062301306,0.0000041151998,0.000018774617,0.000028866989,0.000017325736,0.0010303764],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997607,0.000037376245,0.0000101169435,0.000060853698,0.00010189298,0.000029021196],"domain_scores_gemma":[0.9997687,0.000018906065,0.00006733658,0.000032914108,0.00007443443,0.00003763583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016127524,0.00043040482,0.00019137673,0.0005096904,0.00021225358,0.0002670514,0.0005599679,0.00039358158,0.0013097491],"category_scores_gemma":[0.000336105,0.00025646423,0.0001772163,0.00026032017,0.00018063617,0.00023709236,0.00028479504,0.000122041274,0.00038784326],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027196883,0.00015318146,0.010427884,0.0001920421,0.0000349271,0.000533579,0.00023350255,0.060463995,0.86449134,0.0018021263,0.0009580651,0.06043732],"study_design_scores_gemma":[0.000059167207,0.0039571743,0.052810084,0.00004871508,0.00015105936,0.0009055233,0.00024879863,0.5847623,0.34526876,0.0006346991,0.011047772,0.000105891995],"about_ca_topic_score_codex":0.00045534712,"about_ca_topic_score_gemma":0.0014408077,"teacher_disagreement_score":0.0013097491,"about_ca_system_score_codex":0.00022794765,"about_ca_system_score_gemma":0.00021933077,"threshold_uncertainty_score":0.0043815374},"labels":[],"label_agreement":null},{"id":"W2940370212","doi":"10.29173/mocs1","title":"Advancing Formwork Systems for the Production of Precast Concrete Building Elements: from Manual to Robotic","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Technische Universität München; Deutscher Akademischer Austauschdienst","keywords":"Precast concrete; Formwork; Prefabrication; Production (economics); Flexibility (engineering); Engineering; Process (computing); Construction engineering; Productivity; Computer science; Civil engineering","score_opus":0.006812242377239999,"score_gpt":0.2075581749937642,"score_spread":0.20074593261652418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940370212","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86209816,0.002521209,0.084161155,0.0005000361,0.00008141951,0.00040425512,0.000082016,0.00035396207,0.04979786],"genre_scores_gemma":[0.91931754,0.0017333067,0.06854478,0.000061327635,0.000017291954,0.000064208565,0.00007420178,0.00002172702,0.010165519],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993838,0.00009396625,0.000034512817,0.00009457626,0.0002925169,0.00010063155],"domain_scores_gemma":[0.9995962,0.00007099569,0.00007948282,0.00010379849,0.00011747819,0.00003205509],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068715075,0.0003826087,0.00017531878,0.0005806526,0.0004949041,0.0012443045,0.0005566807,0.00038361712,0.0026130937],"category_scores_gemma":[0.0006009841,0.00021223456,0.00044271155,0.00043664148,0.0010257561,0.0013258866,0.000984452,0.00041839704,0.0008048456],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033091012,0.0003655033,0.030845841,0.0013667844,0.000056439003,0.0015018972,0.0047314307,0.022009013,0.22420135,0.028506927,0.001657824,0.68442607],"study_design_scores_gemma":[0.00014584156,0.0054730456,0.20610152,0.00077125395,0.0003002726,0.003785331,0.012902021,0.06439143,0.36998773,0.014042137,0.32176352,0.0003360182],"about_ca_topic_score_codex":0.011766377,"about_ca_topic_score_gemma":0.016810603,"teacher_disagreement_score":0.011766377,"about_ca_system_score_codex":0.0011483808,"about_ca_system_score_gemma":0.0013383368,"threshold_uncertainty_score":0.023395777},"labels":[],"label_agreement":null},{"id":"W2940399909","doi":"10.29173/mocs60","title":"Behaviour of ultra-high performance fibre reinforced concrete beam-column joint under cyclic loading","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Innovative concrete reinforcement materials","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Materials science; Flexural strength; Structural engineering; Joint (building); Reinforcement; Beam (structure); Compressive strength; Composite material; Stiffness; Hardening (computing); Fiber-reinforced concrete; Strain hardening exponent; Reinforced concrete; Engineering","score_opus":0.01239898576608764,"score_gpt":0.20680134866763736,"score_spread":0.19440236290154972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940399909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99922323,0.00005492785,0.00025154697,0.0000062240597,0.0000024044957,0.0000040911054,0.00005408777,0.00002833733,0.00037505024],"genre_scores_gemma":[0.99905914,0.000028061779,0.00018421635,0.000005773962,7.6679805e-7,0.000004482517,0.000073197065,0.0000085904385,0.00063583744],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999686,0.000030293291,0.000017279586,0.000042890126,0.00015340207,0.000070235066],"domain_scores_gemma":[0.99933785,0.00014539,0.00015299134,0.000071548966,0.00017418739,0.00011810434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026661155,0.00031292115,0.00020254789,0.0004832524,0.00026452116,0.00018870136,0.00027921973,0.0004656545,0.00247677],"category_scores_gemma":[0.0005910334,0.0002359929,0.00020336219,0.00030104685,0.0006268077,0.0002668562,0.00021398749,0.00027354792,0.00042570356],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021733645,0.00005108839,0.004571121,0.00005529353,0.000011573255,0.0003918495,0.00041476655,0.0025949029,0.9894672,0.000040389503,0.000067771485,0.0021167593],"study_design_scores_gemma":[0.000017376857,0.0023886494,0.12345795,0.000023660758,0.000047251866,0.0005838225,0.0006777163,0.014787221,0.8568017,0.000048583228,0.0011071648,0.00005888188],"about_ca_topic_score_codex":0.0038162267,"about_ca_topic_score_gemma":0.0063774064,"teacher_disagreement_score":0.0038162267,"about_ca_system_score_codex":0.00019495231,"about_ca_system_score_gemma":0.00023938311,"threshold_uncertainty_score":0.008285642},"labels":[],"label_agreement":null},{"id":"W2940410126","doi":"10.29173/mocs58","title":"Pull-out tests of a new hooked steel-GFRP composite connector in precast concrete sandwich panels","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; National Natural Science Foundation of China","keywords":"Cable gland; Precast concrete; Structural engineering; Materials science; Composite number; Fibre-reinforced plastic; Composite material; Engineering; Mechanical engineering","score_opus":0.018362347970024055,"score_gpt":0.23549119028255913,"score_spread":0.21712884231253507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940410126","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988638,0.00004083572,0.00089812936,0.000005015639,0.000009446841,0.000011127969,0.000030030247,0.000017531229,0.00012412813],"genre_scores_gemma":[0.99792373,0.0000473506,0.0011607024,0.000007517762,0.0000033460362,0.0000128985375,0.00007425719,0.000008432447,0.00076166296],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993649,0.00008729259,0.000058650647,0.00011208867,0.0002765866,0.000100525],"domain_scores_gemma":[0.9988921,0.0002081016,0.000191608,0.00011275865,0.00032081016,0.0002746116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006935942,0.001047411,0.00030846096,0.00049619767,0.00028465904,0.00014138897,0.0005633141,0.0007996217,0.0014846108],"category_scores_gemma":[0.0009704104,0.00045843763,0.00051842676,0.0002503383,0.00035260126,0.00051018933,0.0005233223,0.00044843677,0.00036449364],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025496152,0.000081415244,0.0021388666,0.000058727557,0.000014241633,0.00027404973,0.0001601249,0.0008909038,0.9945437,0.000030382987,0.000043967124,0.0015086699],"study_design_scores_gemma":[0.0000440143,0.008000297,0.049399935,0.000023204064,0.00006936689,0.00034611017,0.00035745822,0.0072790473,0.93378097,0.000035758334,0.00062330975,0.00004066979],"about_ca_topic_score_codex":0.0007090181,"about_ca_topic_score_gemma":0.0019115438,"teacher_disagreement_score":0.0014846108,"about_ca_system_score_codex":0.00015990598,"about_ca_system_score_gemma":0.0001793514,"threshold_uncertainty_score":0.0049664974},"labels":[],"label_agreement":null},{"id":"W2953406379","doi":"10.29173/mocs128","title":"Numerical and Experimental Study on Modular-Based Timber Structures","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Tree Root and Stability Studies","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Stiffness; Modular design; Structural engineering; Cross laminated timber; Finite element method; Engineering; Shear (geology); Shear wall; Frame (networking); Computer science; Mechanical engineering; Geology","score_opus":0.007846410184613977,"score_gpt":0.21056120056796007,"score_spread":0.20271479038334608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953406379","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98767275,0.00008234405,0.009254389,0.000023040995,0.000017608132,0.000030201587,0.00018378426,0.00010901242,0.002626929],"genre_scores_gemma":[0.99269825,0.000044882876,0.006387194,0.0000037724426,0.0000025342156,0.0000193462,0.000104694234,0.000009393546,0.0007300626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999728,0.00003369774,0.000018251874,0.000044758974,0.00012738733,0.00004791772],"domain_scores_gemma":[0.9990784,0.0004039092,0.00012312403,0.00015399505,0.00016395816,0.000076580654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005292252,0.00043221514,0.00047496386,0.0006163618,0.00030648813,0.0002906401,0.0005698006,0.0007854896,0.0025829573],"category_scores_gemma":[0.0008929562,0.00016806103,0.00033304657,0.00052753446,0.00073834235,0.00033100933,0.00040812715,0.0003239679,0.00026791237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005041349,0.00091892265,0.013680197,0.00045582163,0.000045870736,0.0007353393,0.00068943255,0.60927695,0.3444601,0.0022087726,0.0006023115,0.026422145],"study_design_scores_gemma":[0.00006401413,0.0023423114,0.021657985,0.000039627783,0.000051862076,0.0003193797,0.00054341793,0.86974996,0.10300056,0.00074200914,0.0014400728,0.000048848087],"about_ca_topic_score_codex":0.0010167457,"about_ca_topic_score_gemma":0.0017242138,"teacher_disagreement_score":0.0025829573,"about_ca_system_score_codex":0.00020454807,"about_ca_system_score_gemma":0.00020786368,"threshold_uncertainty_score":0.008640885},"labels":[],"label_agreement":null},{"id":"W2953439837","doi":"10.29173/mocs126","title":"Consequences of the BC Energy Step Code on Offsite Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Sustainability; Efficient energy use; Building code; Building envelope; Architectural engineering; Construction industry; Norm (philosophy); Civil engineering; Engineering; Environmental economics; Construction engineering; Geography; Political science; Economics; Meteorology","score_opus":0.005395932876814841,"score_gpt":0.1748419891560745,"score_spread":0.16944605627925965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953439837","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3462993,0.0010309116,0.005087543,0.01961803,0.0009948134,0.00017113388,0.0014710075,0.00039429413,0.62493294],"genre_scores_gemma":[0.83102816,0.0010436204,0.0037888784,0.00693123,0.000056220833,0.00007671853,0.0010127721,0.00027153778,0.15579078],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9887553,0.0005643175,0.00014856228,0.00040398588,0.008121729,0.002006086],"domain_scores_gemma":[0.9918875,0.0007315919,0.00032832185,0.00039157466,0.005616352,0.0010445501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023323747,0.00039691862,0.00022504377,0.0014306859,0.0071940464,0.0053743906,0.0012625458,0.0015979138,0.010458135],"category_scores_gemma":[0.007926295,0.00031185374,0.00044779602,0.0021751348,0.0032625517,0.00092827383,0.0036253643,0.0029991984,0.0010966088],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047742034,0.00046630626,0.08750699,0.0002820877,0.00004316477,0.004581634,0.011787713,0.011273071,0.00925144,0.35351968,0.24274287,0.2780676],"study_design_scores_gemma":[0.000031342886,0.000113703034,0.1354231,0.000518693,0.000033822515,0.0007626133,0.02231754,0.0043702773,0.0062778923,0.010394117,0.8195842,0.00017289462],"about_ca_topic_score_codex":0.92990756,"about_ca_topic_score_gemma":0.9684904,"teacher_disagreement_score":0.07009244,"about_ca_system_score_codex":0.044683143,"about_ca_system_score_gemma":0.05828339,"threshold_uncertainty_score":0.3242004},"labels":[],"label_agreement":null},{"id":"W2953444445","doi":"10.29173/mocs139","title":"Case Study: Program Management of Volume Modules","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modular design; Piping; Volume (thermodynamics); Modular construction; Systems engineering; Computer science; Quality (philosophy); Fabrication; Manufacturing engineering; Reliability engineering; Engineering; Mechanical engineering; Operating system","score_opus":0.006729706625530917,"score_gpt":0.20028718776821428,"score_spread":0.19355748114268337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953444445","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.890714,0.00023834327,0.059470665,0.0026057025,0.00007343454,0.00092751015,0.0006316962,0.0012525293,0.044086136],"genre_scores_gemma":[0.9412461,0.0001804785,0.04014441,0.00030400165,0.000033708642,0.00030182608,0.0004365775,0.00021995895,0.01713302],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99840975,0.00052688626,0.000058545098,0.00017978846,0.00046534906,0.00035959267],"domain_scores_gemma":[0.9978325,0.0008209139,0.00020781324,0.00019886321,0.0004189612,0.0005210318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010840085,0.00043022272,0.00022193824,0.0006877331,0.0025841233,0.0012209296,0.0016412422,0.001954756,0.0052774777],"category_scores_gemma":[0.0029607096,0.0002687907,0.0003834385,0.00085775607,0.001093094,0.0012566844,0.0011499445,0.0011462518,0.0007134703],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014648365,0.009118845,0.11159151,0.0014487194,0.00017237185,0.05042718,0.04023713,0.22244348,0.04630546,0.056215975,0.058094535,0.40247992],"study_design_scores_gemma":[0.00060592714,0.0051532406,0.095345944,0.0005276832,0.00022781963,0.01518892,0.0566122,0.31315562,0.074980825,0.016742084,0.42111304,0.0003466312],"about_ca_topic_score_codex":0.02168905,"about_ca_topic_score_gemma":0.03139196,"teacher_disagreement_score":0.02168905,"about_ca_system_score_codex":0.0027122214,"about_ca_system_score_gemma":0.0028385671,"threshold_uncertainty_score":0.04312563},"labels":[],"label_agreement":null},{"id":"W2953527716","doi":"10.29173/mocs103","title":"Transfer Learning Enabled Process Recognition for Module Installation of High-rise Modular Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Automation; Computer science; Engineering; Convolutional neural network; Building automation; Embedded system; Software engineering; Systems engineering; Artificial intelligence; Operating system; Mechanical engineering","score_opus":0.006434172699105438,"score_gpt":0.1866436558455424,"score_spread":0.18020948314643698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953527716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14612828,0.0019491108,0.8428632,0.00019064479,0.00010164542,0.000076148506,0.00020708806,0.002573862,0.005910053],"genre_scores_gemma":[0.9202591,0.0014920016,0.07361082,0.00006595134,0.000025096366,0.00005707569,0.00044662954,0.000053025036,0.003990317],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975497,0.000024308643,0.0000117677455,0.00006939233,0.000105325205,0.000034173518],"domain_scores_gemma":[0.99981517,0.00004324513,0.000036271314,0.000021689679,0.000075841206,0.000007902375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039410536,0.00062297017,0.00031115703,0.0007432357,0.00015337626,0.000552777,0.00065573474,0.0005383844,0.00093451195],"category_scores_gemma":[0.00074890174,0.00027548996,0.0007203089,0.0005739098,0.00024740666,0.00092446303,0.0004490074,0.00045757034,0.0003872169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001664682,0.00018312987,0.006400959,0.00044978297,0.00009890201,0.0004164397,0.00016076515,0.35833693,0.04937719,0.0028167644,0.0021841584,0.5794085],"study_design_scores_gemma":[0.0000029226128,0.000060093524,0.0033189633,0.000017334423,0.000037952163,0.00009142298,0.000025080064,0.9740424,0.019572275,0.0008627919,0.0019551832,0.00001363543],"about_ca_topic_score_codex":0.006310919,"about_ca_topic_score_gemma":0.006252552,"teacher_disagreement_score":0.006310919,"about_ca_system_score_codex":0.0007561417,"about_ca_system_score_gemma":0.00055134814,"threshold_uncertainty_score":0.012548327},"labels":[],"label_agreement":null},{"id":"W2953581745","doi":"10.29173/mocs87","title":"Automatic Selection Tool of Quality Control Specifications for Off-site Construction Manufacturing Products: A BIM-based Ontology Model Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Ontology; Information model; Quality (philosophy); Computer science; Quality assurance; Frame (networking); Product (mathematics); Control (management); Systems engineering; Engineering; Software engineering; Artificial intelligence","score_opus":0.01565666423060389,"score_gpt":0.20956941531777623,"score_spread":0.19391275108717235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953581745","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01480783,0.00010143899,0.9722101,0.00020142486,0.000030921572,0.00032288258,0.0010306783,0.0029310165,0.008363707],"genre_scores_gemma":[0.13710836,0.0003001934,0.8550305,0.00009618628,0.000009785349,0.00046810816,0.0036792092,0.00041792018,0.0028897221],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998669,0.0002434302,0.00012881614,0.0002067286,0.0006628914,0.00008913742],"domain_scores_gemma":[0.9987079,0.00041095435,0.00016468199,0.00022406105,0.00042630528,0.0000661336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017582765,0.000790674,0.00066147797,0.00333031,0.0008546766,0.0028209798,0.0013647486,0.0009646046,0.0027762423],"category_scores_gemma":[0.003649975,0.0006556145,0.001903376,0.0018359501,0.00062109623,0.0028106102,0.001795855,0.0009218709,0.0012042479],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031497123,0.001002464,0.012435303,0.0010019378,0.00023727822,0.0015193642,0.0036185752,0.18554094,0.044500068,0.17799374,0.023084229,0.54875106],"study_design_scores_gemma":[0.000045600733,0.0000547757,0.002167383,0.0001649535,0.00012188862,0.0003324988,0.00077888806,0.8989682,0.012237636,0.024750179,0.060312506,0.00006540924],"about_ca_topic_score_codex":0.010499976,"about_ca_topic_score_gemma":0.018205658,"teacher_disagreement_score":0.010499976,"about_ca_system_score_codex":0.0016889804,"about_ca_system_score_gemma":0.0030678804,"threshold_uncertainty_score":0.020877719},"labels":[],"label_agreement":null},{"id":"W2953598351","doi":"10.29173/mocs105","title":"Smart Manufacturing Support to Product Platforms in Industrialized House Building","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Linnéuniversitetet; Stiftelsen för Kunskaps- och Kompetensutveckling","keywords":"Context (archaeology); Product (mathematics); Asset (computer security); Process (computing); Manufacturing engineering; Business; Computer science; Risk analysis (engineering); Engineering; Marketing; Process management; Computer security","score_opus":0.01015971024340754,"score_gpt":0.20018004183550445,"score_spread":0.1900203315920969,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953598351","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93630946,0.0011424926,0.008335706,0.0014134956,0.000016897737,0.00007006663,0.000016872727,0.00004795618,0.05264706],"genre_scores_gemma":[0.9942404,0.00043451172,0.003214875,0.00006505064,0.000003555004,0.000013700776,0.000012943003,0.0000034629988,0.0020114214],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99833316,0.0009777503,0.00006601725,0.00010969584,0.00029013483,0.00022325382],"domain_scores_gemma":[0.99757713,0.0016062019,0.0003313768,0.00018989776,0.00015424656,0.00014109608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018547898,0.00020147464,0.00013353227,0.0013193714,0.0019574976,0.0032940218,0.00067209336,0.0010342248,0.0028013864],"category_scores_gemma":[0.0026318193,0.00020934227,0.00014325193,0.0015022475,0.002611722,0.0030110632,0.003341698,0.00055576937,0.00027621427],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001532864,0.00057594315,0.022845527,0.0014523354,0.000044218494,0.020109795,0.3034565,0.0065253046,0.017938534,0.22752498,0.0039299238,0.39544365],"study_design_scores_gemma":[0.000052092037,0.00067075336,0.04647507,0.0022037236,0.00008653451,0.004149078,0.43731824,0.011142702,0.014712526,0.05540852,0.42767036,0.000110421126],"about_ca_topic_score_codex":0.0021831568,"about_ca_topic_score_gemma":0.007458705,"teacher_disagreement_score":0.0032940218,"about_ca_system_score_codex":0.002234438,"about_ca_system_score_gemma":0.0028219644,"threshold_uncertainty_score":0.016212106},"labels":[],"label_agreement":null},{"id":"W2953706728","doi":"10.29173/mocs116","title":"Evaluation of Risk Management Practice in the Nigeria Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Johannesburg","keywords":"Risk management plan; Risk management; Business; Control (management); Risk analysis (engineering); Project risk management; Identification (biology); IT risk management; Quality (philosophy); Exploratory factor analysis; Plan (archaeology); Operations management; Construction industry; Risk assessment; Enterprise risk management; Project management; Descriptive statistics; Construction management; Marketing; Project management triangle; Engineering; Management; Finance; Economics; Construction engineering; Geography","score_opus":0.036915369771391246,"score_gpt":0.32755710730506427,"score_spread":0.290641737533673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953706728","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99251723,0.0004320653,0.0013749162,0.00048186004,0.0000114871045,0.00016406561,0.000010281362,0.00000878791,0.0049993424],"genre_scores_gemma":[0.99609864,0.00085368886,0.0020556478,0.000037951046,0.000004702681,0.000051922867,0.000009645364,0.0000033972265,0.00088425],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9860314,0.007643137,0.00096757256,0.00041119798,0.004342791,0.00060380367],"domain_scores_gemma":[0.9796377,0.00929163,0.0054537314,0.0005942881,0.0038879334,0.0011347798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010081389,0.00035136574,0.00039162938,0.0026861313,0.0019314132,0.0030692315,0.00059905037,0.00063450757,0.0010010621],"category_scores_gemma":[0.024455905,0.00033054512,0.00026103598,0.0016350276,0.0014693751,0.0016076764,0.0020478696,0.00069725886,0.00016579356],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028167153,0.0012730048,0.32808873,0.0013483027,0.000060185124,0.003008846,0.37158388,0.0020624103,0.00668702,0.0032504434,0.0012165784,0.28113887],"study_design_scores_gemma":[0.000022588561,0.0017719755,0.25864094,0.0021881114,0.00007184,0.0022932556,0.70372874,0.0050419327,0.0041025993,0.0018756498,0.020103943,0.00015830783],"about_ca_topic_score_codex":0.002533025,"about_ca_topic_score_gemma":0.0038371263,"teacher_disagreement_score":0.010081389,"about_ca_system_score_codex":0.0023743506,"about_ca_system_score_gemma":0.0045952746,"threshold_uncertainty_score":0.053316176},"labels":[],"label_agreement":null},{"id":"W2953811449","doi":"10.29173/mocs131","title":"A Survey on Information Flow Tools in Alberta’s Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Digitization; Information flow; Supply chain; Schedule; Information exchange; Key (lock); Phone; Quality (philosophy); Construction industry; Business; Dissemination; Computer science; Process management; Knowledge management; Marketing; Engineering; Construction engineering; Telecommunications; Computer security","score_opus":0.009220101536522788,"score_gpt":0.19234379812503383,"score_spread":0.18312369658851105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953811449","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96251476,0.004092408,0.0015063399,0.0010915272,0.000049686587,0.00017792736,0.0012515902,0.00007716333,0.029238544],"genre_scores_gemma":[0.9593108,0.013843979,0.004898801,0.000603881,0.000028171798,0.000135808,0.002494904,0.000050610968,0.018632997],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9933294,0.0007096936,0.00046727277,0.00027182032,0.0042756223,0.00094624725],"domain_scores_gemma":[0.9857684,0.0051258854,0.0019823774,0.00040761422,0.005350551,0.0013652567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004794275,0.00035673947,0.00033687396,0.00810768,0.0018594719,0.003033787,0.0010349952,0.0008255128,0.0028504692],"category_scores_gemma":[0.007249045,0.00037608301,0.00031716964,0.014033833,0.0012372442,0.0015364768,0.0013810516,0.00065402064,0.0005611008],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018043985,0.0003100257,0.5401444,0.0017509399,0.000053707314,0.0012547089,0.1021816,0.00047304304,0.008338629,0.0030824272,0.010185041,0.33204496],"study_design_scores_gemma":[0.0000056966323,0.00020523177,0.76714396,0.00091778586,0.000033280823,0.0005678451,0.11559806,0.0003492755,0.0010240199,0.00019234231,0.11390582,0.000056590132],"about_ca_topic_score_codex":0.4110869,"about_ca_topic_score_gemma":0.54770833,"teacher_disagreement_score":0.5889131,"about_ca_system_score_codex":0.009120474,"about_ca_system_score_gemma":0.015780421,"threshold_uncertainty_score":0.8173882},"labels":[],"label_agreement":null},{"id":"W2953849572","doi":"10.29173/mocs101","title":"Critical Review of the Principles of Design for Disassembly","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Documentation; Standardization; Checklist; Design elements and principles; Engineering; Construction engineering; Engineering ethics; Sustainable design; Systems engineering; Computer science; Management science; Engineering management; Architectural engineering; Sustainability; Psychology","score_opus":0.017144313547167094,"score_gpt":0.21989947425667147,"score_spread":0.2027551607095044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953849572","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003965161,0.75347656,0.06169297,0.08997401,0.031172559,0.0006585581,0.00039812247,0.00028519984,0.058376934],"genre_scores_gemma":[0.077324845,0.7341557,0.10543988,0.02732068,0.009959714,0.0010300106,0.0007910406,0.00047997708,0.0434981],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97408164,0.007952955,0.0032813826,0.0012882546,0.012882964,0.0005127645],"domain_scores_gemma":[0.9312975,0.02279438,0.002987507,0.0031185779,0.039088503,0.0007135644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020681733,0.0011408498,0.0008197052,0.005200092,0.0016649305,0.003855834,0.0024415024,0.0028714575,0.0043753516],"category_scores_gemma":[0.041828286,0.0006433109,0.0008210955,0.002758117,0.0044517047,0.0031312795,0.0016329188,0.0044745803,0.002499124],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097568256,0.00007404792,0.00045534648,0.013505112,0.00007162406,0.0003756709,0.0026688338,0.0024113131,0.0033642051,0.13916127,0.3003205,0.5374945],"study_design_scores_gemma":[0.000004888919,0.000038965023,0.0002465885,0.0042789443,0.000019542533,0.00012611371,0.00026988235,0.0001676876,0.001026135,0.0063134087,0.98748595,0.000021854938],"about_ca_topic_score_codex":0.004927355,"about_ca_topic_score_gemma":0.0055300174,"teacher_disagreement_score":0.020681733,"about_ca_system_score_codex":0.0078118593,"about_ca_system_score_gemma":0.017465178,"threshold_uncertainty_score":0.10937679},"labels":[],"label_agreement":null},{"id":"W2953903615","doi":"10.29173/mocs85","title":"Just-in-Time Delivery Requires Just-in-Time Production X2 – Sychronising Factory and Site for Successful Prefabrication","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Factory (object-oriented programming); Schedule; Production (economics); Work (physics); Critical path method; Production schedule; Operations management; Order (exchange); Computer science; Operations research; Engineering; Business; Scheduling (production processes); Civil engineering; Systems engineering; Finance","score_opus":0.007860013978445287,"score_gpt":0.2019397066099514,"score_spread":0.1940796926315061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953903615","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03546256,0.0005786086,0.7981864,0.0031881402,0.00070992735,0.001081147,0.00013814642,0.0042649275,0.15639013],"genre_scores_gemma":[0.39871025,0.0008240152,0.50535244,0.0007810031,0.00012246234,0.00064908393,0.00028176117,0.0017081964,0.09157075],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957171,0.0012321821,0.00030028244,0.00051044166,0.0016451179,0.0005947367],"domain_scores_gemma":[0.9916181,0.0025521524,0.0008998659,0.0027751464,0.0016277242,0.000527056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006737815,0.0010115048,0.0005977471,0.00088469236,0.0020797777,0.0052600815,0.0020193877,0.0018456648,0.02887529],"category_scores_gemma":[0.008958726,0.0010982042,0.00077565224,0.0008553817,0.0030683747,0.007938498,0.00493332,0.0021508909,0.011765711],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000554758,0.00054923486,0.0048827487,0.0013318645,0.000045160752,0.0012726932,0.011924433,0.020443033,0.03611794,0.26874176,0.028460838,0.6256756],"study_design_scores_gemma":[0.00015083488,0.00223167,0.011101676,0.0009771412,0.000089715635,0.003776834,0.011363036,0.032402765,0.046421316,0.18573761,0.7054176,0.00032982024],"about_ca_topic_score_codex":0.0028181148,"about_ca_topic_score_gemma":0.004303961,"teacher_disagreement_score":0.02887529,"about_ca_system_score_codex":0.001911933,"about_ca_system_score_gemma":0.005821872,"threshold_uncertainty_score":0.09659749},"labels":[],"label_agreement":null},{"id":"W2953915164","doi":"10.29173/mocs134","title":"Mass Timber in High-Rise Buildings: Modular Design and Construction; Permitting and Contracting Issues","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Documentation; Adaptability; Process (computing); Architectural engineering; Construction engineering; Engineering; Risk analysis (engineering); Order (exchange); Flexibility (engineering); Business; Computer science","score_opus":0.005312865482763209,"score_gpt":0.18984113200233252,"score_spread":0.1845282665195693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953915164","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46243006,0.08527172,0.1583238,0.009194843,0.00038563975,0.00059048674,0.00025584115,0.00020399125,0.28334358],"genre_scores_gemma":[0.91610897,0.020479757,0.040959876,0.0005549297,0.000106495296,0.00012771906,0.00010357298,0.00006839784,0.021490354],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946523,0.0023723065,0.00024011669,0.0003145235,0.0020974283,0.00032337158],"domain_scores_gemma":[0.9952123,0.0027947437,0.0008376192,0.0002896195,0.00067976554,0.00018586342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046654884,0.00031709738,0.00016952112,0.0011996336,0.0019570487,0.0025731777,0.0011378163,0.000907028,0.003759255],"category_scores_gemma":[0.0052115405,0.00027117762,0.00024720718,0.0028092805,0.0035836587,0.0019525635,0.0012524918,0.0009029791,0.00049257564],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007608514,0.00013137686,0.018619554,0.0051267757,0.00003334566,0.005534149,0.055794492,0.007590664,0.011001335,0.3098692,0.007861637,0.57836133],"study_design_scores_gemma":[0.0000091932825,0.00023960373,0.05775122,0.0036517442,0.00005167882,0.0060141576,0.056937203,0.0026983868,0.009019998,0.036530696,0.8270099,0.00008615252],"about_ca_topic_score_codex":0.009213326,"about_ca_topic_score_gemma":0.03918813,"teacher_disagreement_score":0.009213326,"about_ca_system_score_codex":0.0036902768,"about_ca_system_score_gemma":0.005256111,"threshold_uncertainty_score":0.026774943},"labels":[],"label_agreement":null},{"id":"W2953917655","doi":"10.29173/mocs81","title":"Accessibility-Based Location Selection for Building Panelized Housing for Seniors","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Urban Transport and Accessibility","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Tianjin Science and Technology Committee; Alberta Innovates","keywords":"Unit (ring theory); Quality (philosophy); Transport engineering; Selection (genetic algorithm); Business; Subdivision; Set (abstract data type); Environmental economics; Architectural engineering; Computer science; Engineering; Civil engineering; Economics","score_opus":0.015577747676229674,"score_gpt":0.2835381734748504,"score_spread":0.2679604257986207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953917655","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.704307,0.0003141924,0.26230898,0.00031682945,0.000027106125,0.0012345802,0.0013983805,0.0005182065,0.029574757],"genre_scores_gemma":[0.87434405,0.00011443749,0.122474976,0.000010223261,0.0000055196765,0.00023768625,0.0005308682,0.000019995758,0.0022623583],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.999032,0.00041196428,0.0000441746,0.00012249198,0.0002748091,0.000114584356],"domain_scores_gemma":[0.999015,0.00035025334,0.00019900758,0.00008941371,0.0002522955,0.0000941197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085037766,0.00047989108,0.0004175832,0.003846859,0.00076219876,0.0014814255,0.00076703576,0.0003373575,0.005436253],"category_scores_gemma":[0.002610443,0.00021806567,0.0005937424,0.0023279993,0.0005071309,0.0008459129,0.0016819398,0.00021817256,0.0007996305],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007563834,0.0005306719,0.28250217,0.0007677907,0.000115561095,0.0009304939,0.0041567497,0.0758691,0.018292334,0.015022456,0.0058751814,0.59518117],"study_design_scores_gemma":[0.00011328691,0.001822919,0.41258734,0.00032549928,0.0002486997,0.0014972531,0.023851186,0.50619364,0.018123254,0.012137435,0.022794126,0.00030533678],"about_ca_topic_score_codex":0.009020694,"about_ca_topic_score_gemma":0.03195406,"teacher_disagreement_score":0.009020694,"about_ca_system_score_codex":0.0009997308,"about_ca_system_score_gemma":0.0014090133,"threshold_uncertainty_score":0.018186033},"labels":[],"label_agreement":null},{"id":"W2953959273","doi":"10.29173/mocs111","title":"Development of a Design-Driven Parametric Mass Timber Construction System for Modular High-Rise Urban Housing","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Modular design; Architectural engineering; Architecture; Process (computing); Engineering; Civil engineering; Sustainability; Construction engineering; Sustainable development; Parametric statistics; Retrofitting; Computer science; Systems engineering; Geography; Structural engineering","score_opus":0.009357393229763351,"score_gpt":0.1830701828570766,"score_spread":0.17371278962731326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953959273","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050391488,0.00003459036,0.93375474,0.000052410312,0.000030233903,0.000387511,0.00014252716,0.008153806,0.00705272],"genre_scores_gemma":[0.4278422,0.00009291193,0.5612718,0.000057533907,0.000020319732,0.0005766176,0.0006594682,0.0010638426,0.008415319],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99939454,0.00009470832,0.000030187686,0.00008969617,0.00034365762,0.000047152793],"domain_scores_gemma":[0.9994879,0.00013166967,0.000039905553,0.0001544583,0.00013357212,0.000052435298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085353106,0.00061424566,0.0004040381,0.0004144599,0.00032315784,0.00069857977,0.0013402776,0.0005037097,0.006926813],"category_scores_gemma":[0.0012035193,0.0003664454,0.0005481646,0.00017664101,0.00033516347,0.00063154346,0.0010532265,0.0005840821,0.0017243426],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046212538,0.00042188537,0.0060284557,0.000507409,0.000115017516,0.0008776375,0.0019812451,0.28263593,0.29301488,0.01284871,0.006951795,0.3941549],"study_design_scores_gemma":[0.00014041168,0.00093427586,0.0062312894,0.00007851849,0.000092238304,0.00087104103,0.000253983,0.7888486,0.114939526,0.0039061075,0.08355581,0.00014820418],"about_ca_topic_score_codex":0.000782844,"about_ca_topic_score_gemma":0.0010828344,"teacher_disagreement_score":0.006926813,"about_ca_system_score_codex":0.00037222283,"about_ca_system_score_gemma":0.0008011463,"threshold_uncertainty_score":0.023172498},"labels":[],"label_agreement":null},{"id":"W2953985905","doi":"10.29173/mocs75","title":"Smart Construction Site: Ontology of Information System Architecture","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architecture; Ontology; Process (computing); Task (project management); Information system; Systems engineering; Software engineering; Engineering","score_opus":0.002756303758788829,"score_gpt":0.15644658311729176,"score_spread":0.15369027935850293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953985905","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008185664,0.0010856044,0.8960459,0.0023052853,0.00023020295,0.00022563223,0.0004942391,0.00096534163,0.090462044],"genre_scores_gemma":[0.28653535,0.0035526939,0.6812277,0.0007800721,0.0002064816,0.0006813039,0.0018308233,0.00039182112,0.024793688],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99778396,0.00093295757,0.00023499105,0.00026448083,0.00057822705,0.00020537687],"domain_scores_gemma":[0.9987758,0.00040017714,0.00010246073,0.00032916985,0.0002726349,0.000119706856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026109782,0.0005301122,0.00062598946,0.0032421798,0.001717866,0.007788057,0.001400571,0.0019687882,0.0035772454],"category_scores_gemma":[0.0021930889,0.0005622427,0.0010358345,0.004123301,0.0045186104,0.010068434,0.0028365124,0.0024959405,0.0013531504],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000058254172,0.00001716906,0.00027665496,0.000061320454,0.00001131133,0.00008246495,0.00093701726,0.0023077293,0.00057389,0.982242,0.0018695673,0.0116150845],"study_design_scores_gemma":[0.00001775093,0.000034137425,0.0008505983,0.0002771465,0.000033190092,0.0005446381,0.0015689632,0.030968066,0.0012123638,0.5869101,0.37753454,0.00004851333],"about_ca_topic_score_codex":0.007814173,"about_ca_topic_score_gemma":0.005719721,"teacher_disagreement_score":0.007814173,"about_ca_system_score_codex":0.002538031,"about_ca_system_score_gemma":0.004420602,"threshold_uncertainty_score":0.018414736},"labels":[],"label_agreement":null},{"id":"W2954034942","doi":"10.29173/mocs84","title":"Decision Support Tool for Enhancing the Economic Impact of Construction using Offsite Systems","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Edinburgh Napier University","keywords":"Context (archaeology); Computer science; Sustainability; Data science; Process management; Knowledge management; Management science; Risk analysis (engineering); Engineering; Business","score_opus":0.031430257762814134,"score_gpt":0.31841623849304806,"score_spread":0.28698598073023396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954034942","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22675753,0.001254162,0.5866497,0.006645431,0.00051390025,0.002427111,0.0067200405,0.02811795,0.1409142],"genre_scores_gemma":[0.5435274,0.0008848225,0.43932587,0.0004736676,0.000109746645,0.001152682,0.0027144558,0.00080528855,0.0110060405],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99722075,0.0014479789,0.00021593891,0.00025705647,0.0006969278,0.0001613381],"domain_scores_gemma":[0.982321,0.014914383,0.00055992225,0.0009463592,0.0008033952,0.00045484584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004721839,0.0013190114,0.0006618545,0.0034202312,0.00086950825,0.0056390148,0.0018803558,0.0017360531,0.024575094],"category_scores_gemma":[0.017881727,0.00031691664,0.0010757888,0.0023293498,0.0009283964,0.00537332,0.004273367,0.001248877,0.0026522737],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014634929,0.0011266744,0.007400797,0.0047423793,0.00014874109,0.002295997,0.029590985,0.024714945,0.01828504,0.07532455,0.03590856,0.7989978],"study_design_scores_gemma":[0.000771589,0.0022025201,0.01566607,0.0064538065,0.00043641703,0.0018071085,0.03364489,0.14755167,0.032273527,0.17054263,0.58813244,0.0005173746],"about_ca_topic_score_codex":0.0007522843,"about_ca_topic_score_gemma":0.001036255,"teacher_disagreement_score":0.024575094,"about_ca_system_score_codex":0.001069705,"about_ca_system_score_gemma":0.0012994516,"threshold_uncertainty_score":0.08221185},"labels":[],"label_agreement":null},{"id":"W2954062416","doi":"10.29173/mocs93","title":"Risks Identification and Allocation in the Supply Chain of Modular Integrated Construction (MiC)","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Hong Kong Polytechnic University","keywords":"Supply chain; Risk management; Business; Risk analysis (engineering); Identification (biology); Supply chain risk management; Failure mode, effects, and criticality analysis; Bespoke; Modular design; Risk assessment; Stakeholder; Interdependence; Supply chain management; Operations management; Computer science; Service management; Engineering; Reliability engineering; Marketing; Finance","score_opus":0.03765976775095102,"score_gpt":0.29440180055112775,"score_spread":0.2567420328001767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954062416","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67973393,0.00057519303,0.30453107,0.0006815488,0.000050087936,0.00045157628,0.0002497747,0.00015786629,0.013568936],"genre_scores_gemma":[0.9572447,0.00024262312,0.040324934,0.000038613154,0.0000099961235,0.000100401056,0.0001659872,0.000018291435,0.0018543171],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9970872,0.0009160227,0.00018126372,0.0003304168,0.0011309024,0.00035429624],"domain_scores_gemma":[0.99573296,0.0015577425,0.0011791968,0.00016030997,0.0011598604,0.00021002386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035481178,0.0009954462,0.00040241366,0.0030925442,0.0012984315,0.0023469555,0.0006593921,0.000941843,0.0025168122],"category_scores_gemma":[0.007439582,0.0005404485,0.001076049,0.0019341848,0.000876795,0.0023269232,0.0020360432,0.0008558452,0.00021004003],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006757584,0.00029414752,0.113907106,0.0006433454,0.00035822648,0.002043309,0.004019249,0.61109984,0.014680181,0.051197704,0.002172366,0.1989087],"study_design_scores_gemma":[0.000045769084,0.00072735426,0.07054998,0.00031734156,0.0003069941,0.0007833842,0.0046847207,0.8332211,0.010233732,0.07063366,0.008291814,0.00020427458],"about_ca_topic_score_codex":0.0067301444,"about_ca_topic_score_gemma":0.0060347747,"teacher_disagreement_score":0.0067301444,"about_ca_system_score_codex":0.0024678456,"about_ca_system_score_gemma":0.002528492,"threshold_uncertainty_score":0.018764436},"labels":[],"label_agreement":null},{"id":"W2954089627","doi":"10.29173/mocs104","title":"An Efficiency-orientated Total Factor Productivity Measurement Model for Construction Projects","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Productivity; Risk analysis (engineering); Engineering; Computer science; Systems engineering; Manufacturing engineering; Business; Economics","score_opus":0.015141659327271514,"score_gpt":0.20590774227763148,"score_spread":0.19076608295035996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954089627","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057214465,0.00015632286,0.9294662,0.00039320724,0.00003794554,0.00048023183,0.0006276217,0.00026330233,0.011360802],"genre_scores_gemma":[0.7844827,0.00033710795,0.20802605,0.000050511368,0.000019433533,0.0020632658,0.00058790145,0.000046921657,0.004386039],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99652594,0.0019556044,0.00019702723,0.00049172726,0.0005856572,0.00024391554],"domain_scores_gemma":[0.9961331,0.002274768,0.0005374013,0.00022581281,0.00072422915,0.00010458356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061895982,0.0013648863,0.0007456761,0.0024785849,0.00046551094,0.002452827,0.0025519247,0.0018712629,0.0044480124],"category_scores_gemma":[0.010341341,0.0006043769,0.0014556582,0.0035567705,0.0010068493,0.0025336165,0.0014226808,0.0013347714,0.00069735356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041115298,0.00012324988,0.0025632093,0.00007013344,0.00003926618,0.000043520442,0.00010077952,0.9588356,0.00034088525,0.02321077,0.00036428985,0.01426719],"study_design_scores_gemma":[0.000014242542,0.0001131552,0.0009972987,0.000023240991,0.000019269937,0.000017085771,0.000084377076,0.98712313,0.00014486886,0.010407737,0.0010404959,0.000015082899],"about_ca_topic_score_codex":0.0085489005,"about_ca_topic_score_gemma":0.008142181,"teacher_disagreement_score":0.0085489005,"about_ca_system_score_codex":0.0030433033,"about_ca_system_score_gemma":0.002904182,"threshold_uncertainty_score":0.032734096},"labels":[],"label_agreement":null},{"id":"W2954092237","doi":"10.29173/mocs135","title":"Bridging the Gap between Academic and Practice Quantity Surveying in Nigerian Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Openness to experience; Bridging (networking); Bridge (graph theory); Curriculum; Body of knowledge; Knowledge management; Public relations; Medical education; Psychology; Sociology; Political science; Pedagogy; Computer science; Medicine; Social psychology","score_opus":0.01882426593830691,"score_gpt":0.2410966352264226,"score_spread":0.2222723692881157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954092237","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.985145,0.0010509474,0.0034835984,0.0025845845,0.000048255595,0.00012388555,0.000076159056,0.000010444229,0.007477021],"genre_scores_gemma":[0.99735874,0.00038224857,0.0011098424,0.00029079273,0.00001616971,0.00008575249,0.00003104334,0.000003881078,0.0007214579],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.978777,0.010706523,0.002386901,0.0012742169,0.005679271,0.0011761042],"domain_scores_gemma":[0.94710207,0.031516556,0.007802098,0.0021368575,0.009128652,0.002313722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018529901,0.00017677211,0.00034899067,0.0033961623,0.0018231049,0.002750289,0.0006625736,0.0006242546,0.002801641],"category_scores_gemma":[0.040845294,0.0003876551,0.00013549934,0.0035862,0.0021429628,0.002200738,0.002744333,0.00052392826,0.00029166523],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018902987,0.00042753565,0.6430628,0.0011678936,0.00002261549,0.0005904117,0.21796463,0.00034270895,0.0018993103,0.007348942,0.0017305412,0.12525359],"study_design_scores_gemma":[0.000018079732,0.00068456907,0.5497272,0.0014001507,0.00002167539,0.0009200917,0.4003754,0.0015422382,0.0010327707,0.0045086,0.039724268,0.000044918364],"about_ca_topic_score_codex":0.004826015,"about_ca_topic_score_gemma":0.007720473,"teacher_disagreement_score":0.018529901,"about_ca_system_score_codex":0.002192532,"about_ca_system_score_gemma":0.004873805,"threshold_uncertainty_score":0.09799671},"labels":[],"label_agreement":null},{"id":"W2954128976","doi":"10.29173/mocs106","title":"Drywall Waste Blocks: A Novel Masonry Material Utilizing Recycled Construction &amp; Demolition Waste","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"U.S. Geological Survey; Amazon Catalyst; New Jersey Department of Environmental Protection; U.S. Environmental Protection Agency","keywords":"Demolition; Waste management; Masonry; Demolition waste; Construction waste; Gypsum; Waste material; Environmental science; Engineering; Civil engineering; Materials science; Composite material","score_opus":0.008235533146916196,"score_gpt":0.1878078924659409,"score_spread":0.1795723593190247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954128976","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91068894,0.0040880446,0.046945464,0.00020377217,0.0001680118,0.00018537468,0.00044865956,0.0006743038,0.03659741],"genre_scores_gemma":[0.9229125,0.0020969498,0.04884388,0.00010274017,0.000031736854,0.00007418878,0.0005546173,0.00009326147,0.025290139],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99985456,0.000012139087,0.000007874881,0.000018816685,0.00008699313,0.000019597164],"domain_scores_gemma":[0.9999479,0.0000042496413,0.000015457057,0.000008204502,0.000010096225,0.000014026085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012782913,0.00036752562,0.00020385024,0.00085325097,0.00019441955,0.00047541564,0.0003228681,0.00036654342,0.0015647315],"category_scores_gemma":[0.00009381153,0.00018011127,0.00025863643,0.0004460504,0.00022202377,0.00037576657,0.000354951,0.00032015448,0.001129408],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061157814,0.00007467501,0.00045643328,0.00019266755,0.0000068860427,0.00027734393,0.000053396994,0.0007553069,0.96993333,0.0011311779,0.000337453,0.02672013],"study_design_scores_gemma":[0.000013520326,0.0007106288,0.0034270475,0.00003316534,0.00001947798,0.0012069531,0.00004353258,0.0015795231,0.9515512,0.00016263718,0.041234,0.000018331473],"about_ca_topic_score_codex":0.0003011476,"about_ca_topic_score_gemma":0.001450175,"teacher_disagreement_score":0.0015647315,"about_ca_system_score_codex":0.00015538085,"about_ca_system_score_gemma":0.00020953816,"threshold_uncertainty_score":0.005234599},"labels":[],"label_agreement":null},{"id":"W2954167994","doi":"10.29173/mocs123","title":"Cyclic Behavior of a Bamboo-Steel Hybrid Moment Frame with a Novel Energy Dissipation Connection","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Bamboo properties and applications","field":"Agricultural and Biological Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta; Alberta Environment and Protected Areas","funders":"","keywords":"Dissipation; Structural engineering; Serviceability (structure); Dowel; Connection (principal bundle); Hinge; Bamboo; Steel frame; Beam (structure); Stiffness; Joint (building); Frame (networking); Engineering; Materials science; Composite material; Mechanical engineering; Physics","score_opus":0.008441510916481378,"score_gpt":0.1776751096572123,"score_spread":0.16923359874073093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954167994","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958509,0.000121580684,0.0031756896,0.0000125100005,0.000014315319,0.0000051492607,0.000032653545,0.00004028523,0.0007467919],"genre_scores_gemma":[0.9983644,0.000032989596,0.0009552399,0.0000048721504,0.0000027969202,0.000003845337,0.000030280318,0.0000035516234,0.000601915],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99994123,0.0000043734767,0.0000019133363,0.000013980266,0.000023510629,0.000014964488],"domain_scores_gemma":[0.9999281,0.000009072996,0.000023448989,0.000007942794,0.0000145717695,0.000016886503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000081561935,0.00023170962,0.00014294998,0.0002788853,0.00016212957,0.00013231586,0.00021504884,0.00022890703,0.0011053681],"category_scores_gemma":[0.00013728772,0.000104965926,0.00009515877,0.00012634657,0.00020778282,0.00016766696,0.00010976169,0.000098168646,0.00015054013],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019715798,0.000037989186,0.0025998733,0.00004126677,0.000012098648,0.0003373963,0.00010690891,0.0041791555,0.9827549,0.00027858486,0.00012929838,0.009325464],"study_design_scores_gemma":[0.000052872656,0.0028892609,0.08441703,0.000032721473,0.000074165815,0.00066601834,0.00028987395,0.10608071,0.79874253,0.0002728716,0.0064270515,0.000054995005],"about_ca_topic_score_codex":0.0007689221,"about_ca_topic_score_gemma":0.001693119,"teacher_disagreement_score":0.0011053681,"about_ca_system_score_codex":0.00012833928,"about_ca_system_score_gemma":0.00007888796,"threshold_uncertainty_score":0.0036978126},"labels":[],"label_agreement":null},{"id":"W2954309327","doi":"10.29173/mocs108","title":"A Case Study for 3D Modeling Process Analysis based on BIM Log File","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Building information modeling; Framing (construction); Process (computing); Chart; Data file; Reading (process); Engineering drawing; Database; Software engineering; Programming language; Engineering","score_opus":0.010602408505400186,"score_gpt":0.21795297551684306,"score_spread":0.2073505670114429,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954309327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6402692,0.0004191138,0.32323366,0.0012646856,0.00011002381,0.0010809045,0.0021701718,0.0016559705,0.029796343],"genre_scores_gemma":[0.82026756,0.00027670828,0.16801731,0.000079156394,0.000022335946,0.00043376585,0.001176653,0.00029798376,0.009428628],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974318,0.00090236636,0.00014648856,0.00028871853,0.0010300071,0.00020055159],"domain_scores_gemma":[0.9965945,0.0018999396,0.00017302636,0.00067610445,0.0004698666,0.0001866436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024199686,0.0007252704,0.00045296462,0.0024925892,0.0019432609,0.0021026614,0.0016072631,0.0020547279,0.0051231114],"category_scores_gemma":[0.0038658346,0.00043535096,0.0010556037,0.0031250224,0.0012162392,0.0015717451,0.0012587557,0.0009833261,0.0012461892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012740645,0.0036752895,0.087776154,0.0020087853,0.00020442248,0.081111506,0.0488732,0.21837209,0.06752917,0.07764439,0.023662258,0.38786864],"study_design_scores_gemma":[0.00016993393,0.00105655,0.046664897,0.00045595187,0.00024548318,0.016076697,0.031291276,0.61503464,0.09112638,0.016834574,0.18067679,0.00036690716],"about_ca_topic_score_codex":0.008128795,"about_ca_topic_score_gemma":0.014340567,"teacher_disagreement_score":0.008128795,"about_ca_system_score_codex":0.0014249702,"about_ca_system_score_gemma":0.0017272226,"threshold_uncertainty_score":0.017138481},"labels":[],"label_agreement":null},{"id":"W2954311262","doi":"10.29173/mocs137","title":"Site-specific Modular Design Optimization for High-rise Residential Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Set (abstract data type); Genetic algorithm; Plan (archaeology); Computer science; Building design; Daylighting; Efficient energy use; Page layout; Reliability engineering; Engineering; Architectural engineering","score_opus":0.007363822194697756,"score_gpt":0.17986035166124598,"score_spread":0.17249652946654823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954311262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10252348,0.0003298002,0.885557,0.000054280594,0.000025883292,0.000083365085,0.00008385051,0.00037933284,0.010963084],"genre_scores_gemma":[0.7995012,0.00034306993,0.19565268,0.000029726447,0.000013634611,0.00017207031,0.00016693778,0.00012419221,0.003996425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973744,0.00008800742,0.000007548446,0.00004175975,0.00008940126,0.00003589446],"domain_scores_gemma":[0.99984837,0.000049055,0.000033166518,0.000020071036,0.000036588535,0.000012736226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045755273,0.0008558195,0.00054206146,0.0006042954,0.0002347879,0.00051627867,0.00058920233,0.00048486915,0.0022991823],"category_scores_gemma":[0.0005855051,0.00032577265,0.00087865,0.0005455098,0.0003285617,0.0003823739,0.00060023856,0.00042096668,0.0003977726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016039798,0.000018531213,0.00034483869,0.000044191784,0.000011781132,0.000051544364,0.000014596007,0.97933793,0.0059923236,0.001523215,0.00018916298,0.01245599],"study_design_scores_gemma":[0.000008408235,0.000093502385,0.0006104871,0.000006570886,0.000015676162,0.000045037064,0.000020168116,0.99428815,0.0023773743,0.0012937374,0.0012343298,0.000006534628],"about_ca_topic_score_codex":0.0010958251,"about_ca_topic_score_gemma":0.00217909,"teacher_disagreement_score":0.0022991823,"about_ca_system_score_codex":0.00048704815,"about_ca_system_score_gemma":0.00051317003,"threshold_uncertainty_score":0.007691562},"labels":[],"label_agreement":null},{"id":"W2954344888","doi":"10.29173/mocs140","title":"Parklet: A New Urban Platform for Emergent Forms of Communication and Social Interaction in the Cities","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Smart Parking Systems Research","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Design studio; Public relations; Sociology; Knowledge management; Studio; Political science; Computer science","score_opus":0.01955991325097023,"score_gpt":0.242833705000266,"score_spread":0.22327379174929576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954344888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21066926,0.002446278,0.4923801,0.0062550018,0.0016429214,0.0018252269,0.0052320594,0.033874206,0.24567494],"genre_scores_gemma":[0.4904194,0.0017900777,0.31768686,0.001270605,0.00050052686,0.0024393837,0.0042567872,0.004746997,0.17688945],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930596,0.00030123343,0.000026082249,0.00009828583,0.0001557584,0.00011263175],"domain_scores_gemma":[0.99870515,0.0003727367,0.000058913985,0.00035441335,0.00006121425,0.00044751592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011571298,0.0006247206,0.00032906173,0.0008103201,0.0017111981,0.0043802047,0.0018455671,0.0011422036,0.026798192],"category_scores_gemma":[0.0014717143,0.00055902766,0.00073230657,0.000596739,0.001958861,0.0045089,0.011896102,0.0015963597,0.0047341534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014490247,0.0007965392,0.006527399,0.0017253999,0.00012302774,0.004836969,0.053576324,0.013000818,0.0562009,0.26233095,0.23983726,0.35959536],"study_design_scores_gemma":[0.0001541943,0.00038429006,0.003198134,0.00020787575,0.000035284203,0.0012164335,0.003878898,0.0067904536,0.004318607,0.027266502,0.9524266,0.00012276725],"about_ca_topic_score_codex":0.00073358056,"about_ca_topic_score_gemma":0.0037406837,"teacher_disagreement_score":0.026798192,"about_ca_system_score_codex":0.00056731567,"about_ca_system_score_gemma":0.000897847,"threshold_uncertainty_score":0.08964884},"labels":[],"label_agreement":null},{"id":"W2954354629","doi":"10.29173/mocs107","title":"Simulation Based Approach for the Industrialization of a Cabinet Manufacturing Facility","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Cabinet (room); Manufacturing engineering; Productivity; Process (computing); Computer science; Engineering; Operations management; Mechanical engineering; Operating system","score_opus":0.013702117667703038,"score_gpt":0.20579871182783796,"score_spread":0.19209659416013491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954354629","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14016627,0.0003164383,0.80478245,0.00048721337,0.000101785154,0.0004004197,0.0005733991,0.0011859881,0.051985934],"genre_scores_gemma":[0.8409595,0.00040187704,0.14830321,0.00007290956,0.000018856472,0.00048103067,0.0004238665,0.00009594023,0.009242863],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997614,0.00009145741,0.000010100861,0.000034102406,0.000062855965,0.000040058792],"domain_scores_gemma":[0.9996001,0.0002271297,0.000036194408,0.000022508926,0.000082438564,0.000031531836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004422547,0.0006211163,0.0006362897,0.0008846359,0.00087428355,0.0015387476,0.0012599977,0.0013688124,0.0060239215],"category_scores_gemma":[0.00085192756,0.0005731103,0.0010200721,0.000828158,0.00054638326,0.00060851336,0.00083427585,0.0008321893,0.00034897515],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016849559,0.000017547309,0.00024880638,0.000012195665,0.000005504067,0.000030069978,0.000022932934,0.9957521,0.0002919953,0.0021494247,0.00008742692,0.001365132],"study_design_scores_gemma":[0.00000581406,0.000009013987,0.000052824074,0.0000040859845,0.0000029715568,0.000003935348,0.000017539016,0.99881786,0.00012597274,0.0005618288,0.0003954298,0.000002648296],"about_ca_topic_score_codex":0.03294966,"about_ca_topic_score_gemma":0.026277626,"teacher_disagreement_score":0.03294966,"about_ca_system_score_codex":0.0018101525,"about_ca_system_score_gemma":0.0024077273,"threshold_uncertainty_score":0.06551576},"labels":[],"label_agreement":null},{"id":"W2954362421","doi":"10.29173/mocs83","title":"Spatial Parameterization of Non-Semantic CAD Elements for Supporting Automated Disassembly Planning","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Key (lock); Reuse; Component (thermodynamics); Building information modeling; Workflow; Process (computing); Automation; CAD; Digitization; Spatial analysis; Software engineering; Data mining; Engineering drawing; Database; Engineering; Programming language; Computer vision","score_opus":0.011440079346266186,"score_gpt":0.23993380184622834,"score_spread":0.22849372249996217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954362421","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013356749,0.00007356921,0.9827915,0.000039656545,0.0000085415995,0.00006979882,0.00010502825,0.0017381378,0.0018171144],"genre_scores_gemma":[0.22649449,0.00015486633,0.7714553,0.000025598518,0.0000044763833,0.0000763878,0.0007053944,0.00037934852,0.0007041856],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998844,0.00018617894,0.00012045025,0.00024644317,0.0005397778,0.00006303108],"domain_scores_gemma":[0.99838614,0.0005093621,0.00018147494,0.0005048375,0.00038199444,0.000036123984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011112118,0.00106543,0.00072657166,0.0021371625,0.00043437516,0.0023082648,0.0013892256,0.0005909027,0.0019329396],"category_scores_gemma":[0.004326187,0.000599725,0.0008887397,0.0012512405,0.0011354046,0.0019711233,0.0017566326,0.00077991775,0.0007569755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015540418,0.00013645487,0.007106652,0.0003404915,0.000057636636,0.00030348398,0.0012816554,0.36409053,0.064622015,0.042098194,0.0026225406,0.517185],"study_design_scores_gemma":[0.000012575058,0.00007776652,0.0018775365,0.00007235273,0.000036402686,0.00019490595,0.0004460576,0.90070724,0.060039315,0.01619868,0.02028588,0.00005121386],"about_ca_topic_score_codex":0.0043917047,"about_ca_topic_score_gemma":0.007512511,"teacher_disagreement_score":0.0043917047,"about_ca_system_score_codex":0.0008573732,"about_ca_system_score_gemma":0.0013492698,"threshold_uncertainty_score":0.008732259},"labels":[],"label_agreement":null},{"id":"W2954632388","doi":"10.29173/mocs89","title":"Environmental Benefits of Reusable Modular Mass Timber Construction for Residential use in Japan: an LCA Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Environmental Impact and Sustainability","field":"Environmental Science","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Reuse; Benchmark (surveying); Environmental resource management; Sustainability; Engineering; Environmental economics; Environmental science; Civil engineering; Architectural engineering; Computer science; Geography; Ecology; Waste management","score_opus":0.008603269206812831,"score_gpt":0.19812186450071473,"score_spread":0.1895185952939019,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954632388","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.973685,0.0010903327,0.012862524,0.00014972816,0.000015778764,0.00020011056,0.000779177,0.00006944027,0.011147851],"genre_scores_gemma":[0.9892988,0.0005956433,0.008271636,0.00002129418,0.0000068009867,0.00010117937,0.00043985245,0.000022590859,0.0012421348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99965966,0.00009127698,0.000016064854,0.000056377812,0.00012379301,0.00005275844],"domain_scores_gemma":[0.99961555,0.00012030624,0.00006150217,0.00002417856,0.00016191925,0.000016562195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083083165,0.0008611382,0.0004618321,0.002651145,0.0005207349,0.0015577585,0.00041570136,0.00042566544,0.0013882463],"category_scores_gemma":[0.00065712706,0.00034005486,0.0016148753,0.002120755,0.0005180815,0.0007852303,0.000636274,0.00026414692,0.00010243768],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047368696,0.00053418975,0.13003248,0.00070406374,0.00051571795,0.0012690915,0.00035248438,0.7311139,0.032809954,0.006005794,0.0016313337,0.094557345],"study_design_scores_gemma":[0.000036102094,0.00061833306,0.14282437,0.000070423805,0.0008254419,0.00014377476,0.0015216316,0.8366466,0.009686328,0.003771626,0.003753867,0.0001015386],"about_ca_topic_score_codex":0.048405465,"about_ca_topic_score_gemma":0.091181785,"teacher_disagreement_score":0.048405465,"about_ca_system_score_codex":0.0041305283,"about_ca_system_score_gemma":0.001368843,"threshold_uncertainty_score":0.096247435},"labels":[],"label_agreement":null},{"id":"W2954660414","doi":"10.29173/mocs102","title":"Logistics Strategy for Industrialised House Building","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Australian Government","keywords":"Supply chain; Flexibility (engineering); Product (mathematics); Process management; Integrated logistics support; Business; Standardization; Order (exchange); Process (computing); Usability; Modularity (biology); Computer science; Manufacturing engineering; Marketing; Engineering; Economics","score_opus":0.017378192125625427,"score_gpt":0.21797561409648544,"score_spread":0.20059742197086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954660414","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32076398,0.001787097,0.011047234,0.008598738,0.000078307254,0.00018821031,0.00010342129,0.00007285075,0.6573602],"genre_scores_gemma":[0.923896,0.0009415881,0.0025056365,0.00043212174,0.0000147666215,0.000052425064,0.00009466247,0.000013191963,0.07204956],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994666,0.0001750248,0.000022918313,0.000052696814,0.00009267209,0.00019007824],"domain_scores_gemma":[0.999798,0.00004589476,0.000034452652,0.000012921149,0.000052771327,0.000055995282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005459748,0.0002410923,0.00010495771,0.001118981,0.0017000175,0.0064062155,0.000511525,0.0013856111,0.011719886],"category_scores_gemma":[0.00062746875,0.00013978862,0.0002881212,0.0012474004,0.0017656242,0.0017816824,0.002712491,0.0007261321,0.000874954],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022789593,0.00005169033,0.0018929143,0.000077773446,0.0000073168876,0.0011816903,0.004274178,0.0034874645,0.00073652336,0.96574515,0.0024350733,0.020087436],"study_design_scores_gemma":[0.00007019218,0.00033036328,0.016774802,0.00064435473,0.00004017466,0.0014017287,0.06594084,0.012922983,0.0038484307,0.20656338,0.69135743,0.000105369945],"about_ca_topic_score_codex":0.014704208,"about_ca_topic_score_gemma":0.0260801,"teacher_disagreement_score":0.014704208,"about_ca_system_score_codex":0.008324635,"about_ca_system_score_gemma":0.004648793,"threshold_uncertainty_score":0.06039977},"labels":[],"label_agreement":null},{"id":"W2954696798","doi":"10.29173/mocs86","title":"Open Source Timber Systems as a Democratic Tool for Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Architecture and Computational Design","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Architecture; Architectural engineering; Best practice; Population; Engineering; Computer science; Construction engineering; Civil engineering; Sociology; Management","score_opus":0.005843547614776237,"score_gpt":0.1981959360213101,"score_spread":0.19235238840653388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954696798","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037579495,0.00029585915,0.850622,0.002957903,0.00068375753,0.0004252566,0.0011137584,0.048376188,0.091767214],"genre_scores_gemma":[0.14863692,0.0013422095,0.69867235,0.0017760153,0.0012345088,0.002436115,0.01053959,0.04354154,0.091820695],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98673254,0.00429626,0.00083622336,0.0015398216,0.00594292,0.00065222353],"domain_scores_gemma":[0.9580943,0.010849239,0.0019817592,0.022786362,0.004451173,0.001837258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016030675,0.0011239076,0.0006370549,0.0033353912,0.0024443516,0.008543943,0.004273476,0.0032011548,0.032838408],"category_scores_gemma":[0.033469614,0.0009596559,0.0016947461,0.003252765,0.0054269587,0.014139507,0.015468614,0.0047775796,0.022278903],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003126796,0.000534919,0.002624634,0.0008875001,0.00017136533,0.0008419981,0.009460005,0.010454909,0.0154581675,0.4893629,0.12105403,0.3488369],"study_design_scores_gemma":[0.000057222773,0.00008758963,0.0012063732,0.00030699917,0.000024634175,0.00024500757,0.00069413416,0.015831009,0.0042883847,0.2020482,0.77510786,0.00010263007],"about_ca_topic_score_codex":0.0012813366,"about_ca_topic_score_gemma":0.0021075136,"teacher_disagreement_score":0.032838408,"about_ca_system_score_codex":0.0016892803,"about_ca_system_score_gemma":0.0034148311,"threshold_uncertainty_score":0.10985541},"labels":[],"label_agreement":null},{"id":"W2954735062","doi":"10.29173/mocs98","title":"Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence.","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"University of Technology Sydney","keywords":"Productivity; Construction industry; Process (computing); Building industry; Engineering; Operations management; Business; Environmental resource management; Architectural engineering; Computer science; Environmental science; Construction engineering; Economics","score_opus":0.005849767701162874,"score_gpt":0.1888075885468773,"score_spread":0.1829578208457144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954735062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8762328,0.051267955,0.008623854,0.0010226592,0.00016031522,0.00027767828,0.0012755817,0.00008664769,0.0610524],"genre_scores_gemma":[0.97520214,0.015162104,0.0032641976,0.000096941585,0.000034244888,0.00006220328,0.0003647577,0.000027280803,0.0057860906],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99839264,0.00030020307,0.00008811026,0.00016484837,0.0009421832,0.000112106994],"domain_scores_gemma":[0.99691004,0.0010041271,0.0011397252,0.000122052894,0.00070416735,0.00011997296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00172574,0.00030484746,0.00025191423,0.0014171468,0.00033476047,0.0016987644,0.00062044006,0.0003218195,0.0031712174],"category_scores_gemma":[0.0041562063,0.00016762508,0.00035680615,0.0017625056,0.00061724597,0.00085080846,0.00084555434,0.00034867605,0.0005712561],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024579777,0.00023860144,0.10925741,0.011230633,0.00022266436,0.0015085138,0.005643356,0.0018554666,0.041871496,0.004874737,0.0029806714,0.8200706],"study_design_scores_gemma":[0.000010439184,0.0013859301,0.8964198,0.002167326,0.00028909417,0.0020732584,0.011583276,0.00068755174,0.022161314,0.002561908,0.06060668,0.000053526845],"about_ca_topic_score_codex":0.003453433,"about_ca_topic_score_gemma":0.011261942,"teacher_disagreement_score":0.003453433,"about_ca_system_score_codex":0.0010648125,"about_ca_system_score_gemma":0.0012436073,"threshold_uncertainty_score":0.010608733},"labels":[],"label_agreement":null},{"id":"W2954795660","doi":"10.29173/mocs110","title":"Lean Construction Supply Chain: A Bibliometric Analysis of the Knowledge Base","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Johannesburg","keywords":"Supply chain; Lean manufacturing; Knowledge management; Citation; Supply chain management; Lean project management; Lean construction; Scopus; Business; Process management; Computer science; Engineering; Construction industry; Marketing; Political science","score_opus":0.013674878742952656,"score_gpt":0.2163825053200154,"score_spread":0.20270762657706276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954795660","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7699648,0.046120524,0.014219452,0.003160851,0.00036634825,0.0012357035,0.0688582,0.0010855799,0.09498855],"genre_scores_gemma":[0.9154192,0.028226126,0.019759387,0.00014583989,0.00030637195,0.0010213187,0.030473527,0.00012555181,0.0045227287],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99032074,0.0012144225,0.0018661731,0.00063085026,0.005625842,0.0003419287],"domain_scores_gemma":[0.9665444,0.0199885,0.0039702584,0.0011470715,0.007771366,0.00057841756],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0069595794,0.0004846127,0.0012328352,0.18566462,0.0017070182,0.0053579616,0.00075033685,0.00059410586,0.0039650337],"category_scores_gemma":[0.030830199,0.00024095671,0.0011096172,0.17500804,0.0008058863,0.0043360037,0.0027859772,0.00048053922,0.0009086529],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030826472,0.00025490506,0.25668052,0.020774424,0.0014700064,0.0012747155,0.012637392,0.0025600635,0.0072071655,0.012725106,0.024647683,0.6594597],"study_design_scores_gemma":[0.00008591268,0.00044128913,0.6973259,0.0070971353,0.0032784208,0.0031969957,0.03048425,0.0145682935,0.0101136,0.0154712815,0.2176162,0.00032072485],"about_ca_topic_score_codex":0.004834943,"about_ca_topic_score_gemma":0.0052302605,"teacher_disagreement_score":0.81433535,"about_ca_system_score_codex":0.0019493521,"about_ca_system_score_gemma":0.004399336,"threshold_uncertainty_score":0.036806166},"labels":[],"label_agreement":null},{"id":"W2954878952","doi":"10.29173/mocs96","title":"Lateral Performance of Cross-laminated Timber Shear Walls: Analytical and Numerical Investigations","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"FPInnovations; University of Northern British Columbia","funders":"","keywords":"Cross laminated timber; Shear wall; Structural engineering; Parametric statistics; Shear (geology); Finite element method; Kinematics; Engineering; Geotechnical engineering; Geology; Mathematics; Physics","score_opus":0.008290284863517447,"score_gpt":0.20069771006139772,"score_spread":0.1924074251978803,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954878952","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889903,0.00027768116,0.0068586143,0.000031769865,0.000010363098,0.0000109929815,0.000052943997,0.00006330109,0.0037040103],"genre_scores_gemma":[0.99810433,0.00009709328,0.0013008629,0.0000025941888,0.0000021577973,0.0000052193523,0.000018680066,0.0000052557752,0.00046382367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998011,0.00003200591,0.000011356439,0.00002950258,0.00008565593,0.000040347328],"domain_scores_gemma":[0.999491,0.0002101012,0.00012668071,0.00005379983,0.000095616415,0.00002291815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005253139,0.0004003276,0.00031059718,0.00076741085,0.00027342173,0.0005554958,0.000454471,0.00054745056,0.0010208553],"category_scores_gemma":[0.0009796442,0.00020020179,0.00042520912,0.00046600707,0.0006416506,0.00036337037,0.00030237116,0.0001745475,0.00028089198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041674165,0.00024228926,0.014712657,0.00037766344,0.000037682785,0.0009897165,0.000524194,0.70457345,0.23322947,0.0028258788,0.00066604075,0.04140416],"study_design_scores_gemma":[0.000012850274,0.00046299034,0.006424972,0.000039368628,0.00002776022,0.00016331558,0.00026510557,0.9544949,0.037099298,0.0003332734,0.00064194505,0.00003425279],"about_ca_topic_score_codex":0.0011405075,"about_ca_topic_score_gemma":0.0013613546,"teacher_disagreement_score":0.0011405075,"about_ca_system_score_codex":0.00030816763,"about_ca_system_score_gemma":0.00021046364,"threshold_uncertainty_score":0.0034151077},"labels":[],"label_agreement":null},{"id":"W2954892287","doi":"10.29173/mocs119","title":"Strategies for a Safe Integration of Water-Bearing MEP Systems in Prefabricated CLT Room Modules","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Österreichische Forschungsförderungsgesellschaft","keywords":"Prefabrication; Piping; Modular design; Engineering; Bearing (navigation); Routing (electronic design automation); Architectural engineering; Civil engineering; Construction engineering; Computer science; Mechanical engineering; Embedded system","score_opus":0.009056262430301934,"score_gpt":0.19679581105613472,"score_spread":0.18773954862583278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954892287","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5704068,0.00086250325,0.42343134,0.00013946852,0.000038129332,0.0002569626,0.00009837216,0.0012522449,0.0035141485],"genre_scores_gemma":[0.87774426,0.0002831874,0.11977517,0.000022923277,0.000012228896,0.00009633984,0.00013264136,0.00007057521,0.00186258],"study_design_codex":"bench_or_experimental","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992743,0.00015611813,0.00004326694,0.00008381078,0.0003078973,0.00013461213],"domain_scores_gemma":[0.9993994,0.00008427784,0.00019778615,0.000121701996,0.0001556392,0.000041263138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007070346,0.00057251955,0.00035612783,0.00077133544,0.000261752,0.00049940124,0.000792142,0.0004042363,0.0012756281],"category_scores_gemma":[0.00093475677,0.00025447962,0.00040062598,0.00039194632,0.00031464457,0.0005812473,0.0006969513,0.00033613306,0.00063012395],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028579295,0.0002666219,0.012683789,0.0005868883,0.000037594265,0.0007564355,0.0005445408,0.045899544,0.7112089,0.0020365643,0.0007136499,0.2249797],"study_design_scores_gemma":[0.00009488779,0.0044531883,0.07460668,0.0001871425,0.00016856605,0.0025646326,0.0010556882,0.101991676,0.77925104,0.0019438812,0.033566255,0.00011635445],"about_ca_topic_score_codex":0.0004898522,"about_ca_topic_score_gemma":0.000850323,"teacher_disagreement_score":0.0012756281,"about_ca_system_score_codex":0.00023062387,"about_ca_system_score_gemma":0.0004521081,"threshold_uncertainty_score":0.0042673945},"labels":[],"label_agreement":null},{"id":"W2954896328","doi":"10.29173/mocs82","title":"A Knowledge-Based Approach Towards Automated Manufacturing-Centric BIM: Wood Frame Design and Modelling for Light-Frame Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Framing (construction); Modular design; Frame (networking); Field (mathematics); Engineering; Modular construction; Construction engineering; Systems engineering; Construction industry; Computer science; Context (archaeology); Architectural engineering; Best practice; Software engineering; Civil engineering; Compatibility (geochemistry); Mechanical engineering","score_opus":0.011602531409594576,"score_gpt":0.2007306233714876,"score_spread":0.189128091961893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954896328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023357107,0.000042161955,0.99363893,0.00009407097,0.000007702546,0.000100403115,0.00009978873,0.00083856384,0.0028427613],"genre_scores_gemma":[0.048398327,0.00016217875,0.94894236,0.000056667708,0.0000078764615,0.0002073133,0.0004959242,0.00013715908,0.0015921395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99789315,0.00057190424,0.00020387614,0.00044845697,0.0007703802,0.00011224503],"domain_scores_gemma":[0.9984982,0.00059857336,0.0001335613,0.0004209992,0.00028339666,0.00006531731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020980013,0.0010975813,0.0008836906,0.0026985533,0.001222847,0.0052690962,0.0035832142,0.002064177,0.004069925],"category_scores_gemma":[0.004526564,0.0011292025,0.0018464167,0.0020547495,0.0016937677,0.0029423062,0.0034649363,0.0016949235,0.0015105782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010507962,0.00044460807,0.0017239549,0.00062036695,0.00011279204,0.0010476608,0.0036485442,0.48572,0.018154893,0.120698184,0.0054183854,0.36230552],"study_design_scores_gemma":[0.000026865428,0.000049261576,0.0006885842,0.00017837167,0.000052730687,0.0003323235,0.00064146717,0.9028514,0.010410026,0.048299827,0.036402017,0.00006714362],"about_ca_topic_score_codex":0.012997751,"about_ca_topic_score_gemma":0.019522497,"teacher_disagreement_score":0.012997751,"about_ca_system_score_codex":0.0021148156,"about_ca_system_score_gemma":0.002949571,"threshold_uncertainty_score":0.025844157},"labels":[],"label_agreement":null},{"id":"W2954899194","doi":"10.29173/mocs79","title":"Applying Virtual Reality to Improve the Construction Logistics of High-rise Modular Integrated Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Plan (archaeology); Virtual reality; Construction management; Modular construction; Construction engineering; Unit (ring theory); Engineering; Computer science; Architectural engineering; Transport engineering; Engineering management; Operations research; Operations management; Civil engineering; Artificial intelligence","score_opus":0.007034569385863198,"score_gpt":0.1939025671253843,"score_spread":0.18686799773952112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954899194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18847401,0.00040700263,0.79778844,0.00031302814,0.00008850583,0.00012055438,0.00006665631,0.0011115309,0.011630362],"genre_scores_gemma":[0.87699014,0.0004927927,0.12029887,0.000062293075,0.000012572339,0.00005825817,0.0000858504,0.00005827367,0.00194104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994999,0.00019909375,0.000025341493,0.0000554052,0.00014094183,0.00007920466],"domain_scores_gemma":[0.9994804,0.00021025795,0.00008556984,0.00006826545,0.000115182294,0.000040321152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066658476,0.0008563261,0.0005397,0.0008881349,0.0004071584,0.0019074731,0.00081540865,0.00089167967,0.0020159916],"category_scores_gemma":[0.0019521576,0.00046004774,0.0010466485,0.0006843109,0.0004494191,0.0015558648,0.0013911097,0.00054350466,0.0003660701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010732632,0.000171428,0.0019880175,0.00010651975,0.00003035743,0.00026170004,0.0003190507,0.9350874,0.008559923,0.0031243558,0.0004498828,0.049794044],"study_design_scores_gemma":[0.000015107064,0.00017066393,0.0012098128,0.000018677305,0.000033881603,0.00006377026,0.00018435017,0.9930675,0.0028654516,0.00087175414,0.0014686252,0.000030470052],"about_ca_topic_score_codex":0.007583343,"about_ca_topic_score_gemma":0.0064824377,"teacher_disagreement_score":0.007583343,"about_ca_system_score_codex":0.0006216846,"about_ca_system_score_gemma":0.0011314184,"threshold_uncertainty_score":0.015078425},"labels":[],"label_agreement":null},{"id":"W2954958024","doi":"10.29173/mocs74","title":"Cost Evolution Throughout the Construction Value Chain","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost estimate; Phase (matter); Track (disk drive); Perspective (graphical); Real estate; Business; Computer science; Construction engineering; Operations management; Marketing; Engineering; Systems engineering; Finance","score_opus":0.03892204446838546,"score_gpt":0.31430597392451376,"score_spread":0.27538392945612833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954958024","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9608155,0.00032098114,0.024788268,0.00020194394,0.000013371357,0.00007717923,0.000530651,0.0000761661,0.013176062],"genre_scores_gemma":[0.9877489,0.00020189582,0.0076626446,0.000008178824,0.000003903895,0.000053218413,0.00044168433,0.000032802363,0.0038466884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9979315,0.0003170034,0.00010748512,0.00020089674,0.0011212834,0.0003217619],"domain_scores_gemma":[0.99303234,0.002661998,0.0011835131,0.00045457217,0.0024523123,0.00021523733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014355143,0.0003532476,0.00022823513,0.0043311026,0.0005601056,0.0032218057,0.0006087094,0.000625977,0.0026912354],"category_scores_gemma":[0.009212103,0.00035025025,0.00035171094,0.0051001934,0.00054412946,0.0026386883,0.00079750206,0.0005600855,0.000476376],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006494668,0.0002909605,0.32266104,0.00026708952,0.00012266493,0.0010893001,0.0027124498,0.33691892,0.011138231,0.049469657,0.0016445016,0.2730357],"study_design_scores_gemma":[0.000022566097,0.0005915335,0.38552403,0.00018308223,0.00012186327,0.001003417,0.005538191,0.53826654,0.01819865,0.029861644,0.020475445,0.00021305321],"about_ca_topic_score_codex":0.008907207,"about_ca_topic_score_gemma":0.006942345,"teacher_disagreement_score":0.008907207,"about_ca_system_score_codex":0.0032492187,"about_ca_system_score_gemma":0.0012000364,"threshold_uncertainty_score":0.02357483},"labels":[],"label_agreement":null},{"id":"W2955013354","doi":"10.29173/mocs121","title":"Disproportionate Collapse Mitigation in Tall Mass Timber Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Tree-ring climate responses","field":"Earth and Planetary Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Progressive collapse; Structural integrity; Robustness (evolution); Forensic engineering; Engineering; SAFER; Architectural engineering; Civil engineering; Risk analysis (engineering); Reinforced concrete; Computer science; Business; Structural engineering; Computer security","score_opus":0.00546243556384635,"score_gpt":0.1937884916255907,"score_spread":0.18832605606174435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955013354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9178882,0.0009375807,0.060910128,0.00019383014,0.000057192574,0.00014111168,0.00012754409,0.00042511456,0.019319244],"genre_scores_gemma":[0.98750836,0.00025270059,0.00899238,0.00003596667,0.000010109103,0.000024240442,0.00010770391,0.000030472313,0.0030379575],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995819,0.00005740361,0.000012165476,0.000049408896,0.00019871283,0.00010037217],"domain_scores_gemma":[0.9995264,0.00007651087,0.00010379174,0.0000611521,0.00014247568,0.00008964447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045664946,0.0005243991,0.00035939488,0.0009636236,0.0007090363,0.00062720245,0.00076122134,0.00043445427,0.0029618654],"category_scores_gemma":[0.00090466306,0.00020185286,0.00029908406,0.00036090318,0.0004269956,0.0007123455,0.0013875946,0.00032709498,0.00064709596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006754671,0.0006010709,0.09141075,0.0009359918,0.00015367928,0.0023920157,0.0026734585,0.16956703,0.30237684,0.009584186,0.0065126386,0.4131169],"study_design_scores_gemma":[0.000047933037,0.004172481,0.3565854,0.0006119668,0.00038514307,0.0027954027,0.009014018,0.45518807,0.1085183,0.013234493,0.049267657,0.00017914761],"about_ca_topic_score_codex":0.004008507,"about_ca_topic_score_gemma":0.01739255,"teacher_disagreement_score":0.004008507,"about_ca_system_score_codex":0.00041801672,"about_ca_system_score_gemma":0.00054528733,"threshold_uncertainty_score":0.009908438},"labels":[],"label_agreement":null},{"id":"W2955074025","doi":"10.29173/mocs109","title":"Assessing the Environmental Implications of Industrialized Housing: a Systematic Literature Review","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Environmental impact assessment; Prefabrication; Life-cycle assessment; Process (computing); Systematic review; Engineering; Business; Risk analysis (engineering); Architectural engineering; Operations management; Computer science; Civil engineering; Production (economics); Economics; Political science","score_opus":0.0095084233190437,"score_gpt":0.21796512665666148,"score_spread":0.2084567033376178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955074025","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025967418,0.9949704,0.0003456308,0.00043584438,0.00010086291,0.00027295886,0.0005133673,0.000008032758,0.00075624615],"genre_scores_gemma":[0.011684815,0.9864379,0.00082269375,0.00032810555,0.00004396808,0.0002812239,0.00027533618,0.0000039038036,0.00012199248],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9942472,0.001799917,0.0017585742,0.00054228806,0.0014432854,0.00020874792],"domain_scores_gemma":[0.97424763,0.019121708,0.0033349844,0.00034080644,0.0026798015,0.0002751131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006969318,0.0012742748,0.0032004123,0.020372016,0.00075461634,0.0029035222,0.0016454206,0.0017011509,0.0038089606],"category_scores_gemma":[0.025365675,0.000891904,0.0038642061,0.017642241,0.001040259,0.0032974228,0.0019348927,0.0009817824,0.00035917773],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058085236,0.000037101338,0.0014723205,0.8928749,0.0016866078,0.00036741977,0.00091340166,0.0002385322,0.0002647378,0.001089399,0.0027093785,0.09828821],"study_design_scores_gemma":[0.000027763697,0.00013070297,0.0049681086,0.9348249,0.00971727,0.00056212005,0.0018061455,0.00010317404,0.00022085271,0.0006109418,0.046988267,0.000039754494],"about_ca_topic_score_codex":0.009095418,"about_ca_topic_score_gemma":0.029560518,"teacher_disagreement_score":0.020372016,"about_ca_system_score_codex":0.0037203566,"about_ca_system_score_gemma":0.017598428,"threshold_uncertainty_score":0.036857724},"labels":[],"label_agreement":null},{"id":"W2955098802","doi":"10.29173/mocs130","title":"Appraisal of the Challenges to Ensuring Occupational Health and Safety Compliance within the Nigerian Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Occupational safety and health; Construction industry; Business; Compliance (psychology); Environmental health; Hazardous waste; Operations management; Effective safety training; Engineering; Risk analysis (engineering); Medicine; Public health; Occupational health nursing; Nursing; Health policy; Construction engineering; Psychology","score_opus":0.06933138393548235,"score_gpt":0.3847699603965079,"score_spread":0.3154385764610256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955098802","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9808096,0.0026652077,0.0004708698,0.0076770824,0.000086152104,0.000100566904,0.000025099202,0.000004561011,0.00816074],"genre_scores_gemma":[0.9959402,0.002424882,0.0005532926,0.0002904434,0.000022701519,0.000027182574,0.0000144696505,0.0000013154898,0.00072552875],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9931987,0.0032302623,0.00053590105,0.00022128657,0.0017136997,0.0011001708],"domain_scores_gemma":[0.9881302,0.0045136316,0.0026764576,0.00020860402,0.002755877,0.0017151723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006972041,0.00022600061,0.0002522519,0.0007884886,0.00325924,0.0035994414,0.0004682272,0.0011063421,0.0013837169],"category_scores_gemma":[0.01057884,0.00027711186,0.000178745,0.0010051042,0.0013501259,0.0013907262,0.0015774792,0.0009113099,0.00015822456],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024024362,0.0007038861,0.5456273,0.0030025628,0.00006315656,0.0062930207,0.24240208,0.0017060334,0.0043238886,0.005712472,0.0047894367,0.18513596],"study_design_scores_gemma":[0.000007950168,0.00048943004,0.3556788,0.0014877638,0.000024472272,0.0010703224,0.61981714,0.00088012475,0.000672577,0.0010339968,0.018786438,0.000051051607],"about_ca_topic_score_codex":0.011469883,"about_ca_topic_score_gemma":0.021477146,"teacher_disagreement_score":0.011469883,"about_ca_system_score_codex":0.002696915,"about_ca_system_score_gemma":0.011761903,"threshold_uncertainty_score":0.03687215},"labels":[],"label_agreement":null},{"id":"W2955118984","doi":"10.29173/mocs80","title":"Structural Design and Modelling Method for the Post-tensioned CLT Shear Wall Structures","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Seismic Performance and Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Structural engineering; Shear wall; Parametric statistics; Shear (geology); Calibration; Engineering; Materials science; Mathematics; Composite material; Statistics","score_opus":0.012992538035093301,"score_gpt":0.21500139725301362,"score_spread":0.20200885921792033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955118984","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003335656,0.000045639772,0.99456656,0.00001957377,0.000014372989,0.000056200664,0.00004699043,0.00023545999,0.0016795542],"genre_scores_gemma":[0.21770903,0.0002407897,0.77701825,0.0000534532,0.000018355044,0.0006372195,0.00033105188,0.00016228059,0.0038295828],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991574,0.00014571255,0.000044867542,0.00012452847,0.000493748,0.0000336902],"domain_scores_gemma":[0.99946696,0.00013916363,0.000108530934,0.000091384885,0.00018077753,0.00001320524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010188387,0.0008733943,0.00042252298,0.00075220043,0.00027615658,0.00056524336,0.0011413851,0.0006307855,0.004566417],"category_scores_gemma":[0.0011615239,0.0005115872,0.0008041522,0.00040088175,0.00031536203,0.00046255862,0.0005157426,0.00074667734,0.001163537],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005841169,0.00007334521,0.0018522004,0.00045469665,0.00004563072,0.00009362913,0.00019682595,0.7384227,0.057285927,0.011829311,0.0013439558,0.18834329],"study_design_scores_gemma":[0.000020067055,0.000206142,0.0009646696,0.00003739578,0.000031591167,0.00012234622,0.000042264306,0.9692387,0.01216749,0.0018504355,0.01529252,0.000026349007],"about_ca_topic_score_codex":0.002237175,"about_ca_topic_score_gemma":0.0032404743,"teacher_disagreement_score":0.004566417,"about_ca_system_score_codex":0.00056824647,"about_ca_system_score_gemma":0.001161245,"threshold_uncertainty_score":0.015276253},"labels":[],"label_agreement":null},{"id":"W2955171787","doi":"10.29173/mocs92","title":"The Value Proposition of RFID Technology in Tall Prefabricated Timber Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Radio-frequency identification; Supply chain; Factory (object-oriented programming); Value proposition; Architectural engineering; Production (economics); Investment (military); Order (exchange); Engineering; Computer science; Operations management; Manufacturing engineering; Systems engineering; Business; Civil engineering; Computer security; Marketing","score_opus":0.002543184224073203,"score_gpt":0.17191218858594248,"score_spread":0.16936900436186927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955171787","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9550818,0.00070232456,0.010364324,0.0007975216,0.00001229522,0.00015148937,0.000034092373,0.000008200699,0.032847814],"genre_scores_gemma":[0.99715745,0.00016807919,0.0021035422,0.000025182622,0.0000027642657,0.000023870185,0.000006775659,6.523303e-7,0.0005117185],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9963058,0.0024554562,0.00006934471,0.00015170593,0.0007880889,0.00022968708],"domain_scores_gemma":[0.98543996,0.01192831,0.0011975943,0.000394413,0.00071674393,0.00032291826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052193706,0.00027381536,0.00025581,0.0008326137,0.0009364987,0.003259297,0.0006123033,0.0010416544,0.0025353078],"category_scores_gemma":[0.010431601,0.00024832287,0.00022639983,0.00092777953,0.0030303667,0.003454571,0.0015581835,0.0009395208,0.00017720819],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022125163,0.0016643789,0.08288285,0.001504046,0.00012925008,0.0039433376,0.024500059,0.060622726,0.030465962,0.36857313,0.0012304552,0.42227122],"study_design_scores_gemma":[0.00026551363,0.011669745,0.24517892,0.004327714,0.0004081281,0.0025291347,0.1264748,0.13256845,0.046504356,0.38390824,0.04567093,0.0004940463],"about_ca_topic_score_codex":0.001386456,"about_ca_topic_score_gemma":0.0032269058,"teacher_disagreement_score":0.0052193706,"about_ca_system_score_codex":0.0026635714,"about_ca_system_score_gemma":0.0017712666,"threshold_uncertainty_score":0.02760297},"labels":[],"label_agreement":null},{"id":"W2955191606","doi":"10.29173/mocs142","title":"Numerical Study of the Geometry Effect of Notched Connections in Mass Timber Panel-Concrete Composite Floors","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Structural engineering; Finite element method; Stiffness; Interlocking; Composite number; Bending; Ultimate tensile strength; Shear (geology); Beam (structure); Materials science; Engineering; Composite material","score_opus":0.006046915183998734,"score_gpt":0.1826913364502016,"score_spread":0.17664442126620286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955191606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9879711,0.0001572432,0.0068594343,0.00004428798,0.000025410338,0.000022329325,0.00011240516,0.00011355501,0.0046941484],"genre_scores_gemma":[0.99740916,0.000042271313,0.001961253,0.000006221476,0.0000024730477,0.0000075779903,0.000033159016,0.00001074577,0.00052703766],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996655,0.00007387058,0.000019004401,0.000051439518,0.000095637406,0.000094606876],"domain_scores_gemma":[0.9987925,0.0006438837,0.00018855311,0.00009083186,0.00016628823,0.00011779676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055766664,0.00050050404,0.00068306056,0.0006734389,0.0005778097,0.0007440779,0.0006598642,0.0011708986,0.001999125],"category_scores_gemma":[0.0017666136,0.0004159515,0.00046846428,0.00055195705,0.001003077,0.00043999768,0.000532448,0.0003789665,0.0002297217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023042907,0.00012180927,0.0061916523,0.00009877077,0.00002664133,0.00047441229,0.00014014014,0.9651609,0.023083476,0.00064290746,0.00023687552,0.0035920567],"study_design_scores_gemma":[0.000021463637,0.00022336889,0.0044294177,0.000016893788,0.000022029913,0.000064905624,0.00013743206,0.98932564,0.005356586,0.0001509511,0.00023443218,0.000016861499],"about_ca_topic_score_codex":0.0057690716,"about_ca_topic_score_gemma":0.0055716364,"teacher_disagreement_score":0.0057690716,"about_ca_system_score_codex":0.000564446,"about_ca_system_score_gemma":0.00043138844,"threshold_uncertainty_score":0.0114709735},"labels":[],"label_agreement":null},{"id":"W2955193216","doi":"10.29173/mocs120","title":"Cross-Laminated Timber Shear Walls in Balloon Construction: Seismic Performance of Steel Connections","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Resources Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Cross laminated timber; Structural engineering; Shear wall; Shear (geology); Engineering; Seismic analysis; Low-rise; Seismic loading; Compatibility (geochemistry); Civil engineering; Geology","score_opus":0.0057224313996502,"score_gpt":0.18431861891762283,"score_spread":0.17859618751797263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955193216","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99908495,0.000018670442,0.00040778832,0.0000025339389,0.0000022337485,0.000004366245,0.000026762951,0.000009831259,0.00044280052],"genre_scores_gemma":[0.9992561,0.000023487239,0.00042752828,0.0000014372154,8.083805e-7,0.0000036890247,0.000037328922,0.000003357851,0.00024631713],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997466,0.00004888427,0.0000142426015,0.000044101354,0.000093943374,0.000052210376],"domain_scores_gemma":[0.9995266,0.00014492944,0.00009250863,0.000050273436,0.000102635786,0.00008311779],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043139048,0.00053316966,0.0003078663,0.00047684484,0.00026318437,0.00028316758,0.00038851696,0.00053443684,0.0012780792],"category_scores_gemma":[0.00067115336,0.00019280426,0.00035680563,0.00041926443,0.00054105284,0.00023589075,0.00031959062,0.00024426822,0.00030369696],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026695095,0.0005325055,0.05144113,0.00027460515,0.000052333042,0.0011587557,0.0009816325,0.19829503,0.7145117,0.00068192405,0.00028537237,0.029115561],"study_design_scores_gemma":[0.00012073675,0.01548375,0.30393815,0.00009221398,0.00016874577,0.0005429471,0.0020106584,0.20768267,0.46658263,0.00027862817,0.0029940128,0.00010480231],"about_ca_topic_score_codex":0.0023496153,"about_ca_topic_score_gemma":0.0057625,"teacher_disagreement_score":0.0023496153,"about_ca_system_score_codex":0.00027224649,"about_ca_system_score_gemma":0.00021277553,"threshold_uncertainty_score":0.0046718717},"labels":[],"label_agreement":null},{"id":"W2955210593","doi":"10.29173/mocs124","title":"Development of Rigging System for Prefabricated Wood I-joist Floor Panels","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Joist; Flange; Structural engineering; Engineering","score_opus":0.007278862539126175,"score_gpt":0.18389433862979573,"score_spread":0.17661547609066955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955210593","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6840623,0.0013433082,0.30749676,0.00013002753,0.00016591296,0.0006097055,0.0003176493,0.002422584,0.0034517655],"genre_scores_gemma":[0.80410486,0.0006020505,0.1896069,0.00009182831,0.000052851377,0.00019193205,0.00036718906,0.000097820666,0.00488458],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936754,0.00004714981,0.000055354347,0.000112963455,0.00033879327,0.00007811978],"domain_scores_gemma":[0.99944705,0.00008681854,0.000108426866,0.0001113135,0.00019836833,0.000047973834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006054193,0.0005309542,0.00039483016,0.0007034832,0.00024526866,0.00029632443,0.0010086121,0.0005278667,0.0017589295],"category_scores_gemma":[0.00070408854,0.00034159634,0.00045658395,0.00037987457,0.00026603945,0.0006679874,0.0004471008,0.0004476202,0.00064566464],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015195698,0.0001119606,0.001935988,0.00029608762,0.0000105049185,0.00029496703,0.00017026265,0.0014261153,0.91656446,0.0003239958,0.0004441147,0.07826947],"study_design_scores_gemma":[0.000063513544,0.002708201,0.029139642,0.000088165194,0.000075125135,0.0012300188,0.0002304068,0.029646495,0.9209935,0.00019034749,0.015464123,0.00017050552],"about_ca_topic_score_codex":0.00062410673,"about_ca_topic_score_gemma":0.0008155626,"teacher_disagreement_score":0.0017589295,"about_ca_system_score_codex":0.00015579372,"about_ca_system_score_gemma":0.0003329796,"threshold_uncertainty_score":0.00588423},"labels":[],"label_agreement":null},{"id":"W2955214881","doi":"10.29173/mocs113","title":"Research Trends in Off-Site Construction Management: Review of Literature at the Process Level","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Quality (philosophy); Process (computing); Excellence; Standardization; Process management; Project management; Engineering management; Business; Engineering; Operations management; Computer science; Systems engineering; Political science","score_opus":0.014465674163967854,"score_gpt":0.25808642755039835,"score_spread":0.2436207533864305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955214881","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00081610173,0.99661356,0.00015989356,0.0011470802,0.00015321381,0.0000076026326,0.000040522304,0.000005372443,0.0010566923],"genre_scores_gemma":[0.0044511794,0.9941591,0.00036329363,0.00054690347,0.00023953986,0.000013477028,0.00006480008,0.0000048285533,0.00015686323],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99590576,0.0011032972,0.0009794286,0.0006463952,0.0011404065,0.00022465861],"domain_scores_gemma":[0.95441574,0.034244932,0.004321712,0.0004575645,0.0058469805,0.0007130057],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0064364797,0.0008872827,0.0014123282,0.020245746,0.0007988887,0.0046404144,0.0014751492,0.0022728767,0.003955321],"category_scores_gemma":[0.019174716,0.000801577,0.0014040767,0.026124572,0.0016554703,0.00669352,0.0013722623,0.0017835185,0.0008938378],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012722315,0.00014091453,0.0047756573,0.2000971,0.00034774258,0.00055164355,0.0038018255,0.00051167305,0.0008439019,0.011112884,0.02334894,0.75434047],"study_design_scores_gemma":[0.00002537771,0.00020811494,0.022501176,0.28668672,0.0012122341,0.001933754,0.007571787,0.00035433364,0.00061697984,0.0059905592,0.67279947,0.00009944449],"about_ca_topic_score_codex":0.005875632,"about_ca_topic_score_gemma":0.009373032,"teacher_disagreement_score":0.97975427,"about_ca_system_score_codex":0.0027610022,"about_ca_system_score_gemma":0.00932585,"threshold_uncertainty_score":0.034039795},"labels":[],"label_agreement":null},{"id":"W2955276466","doi":"10.29173/mocs73","title":"Data Analytics of Production Cycle Time for Offsite Construction Projects","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Productivity; Context (archaeology); Production (economics); Work (physics); Duration (music); Process (computing); Factory (object-oriented programming); Product (mathematics); Analytics; Computer science; Operations research; Engineering","score_opus":0.01515735602452109,"score_gpt":0.21053213920151176,"score_spread":0.19537478317699067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955276466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8751442,0.00035511237,0.032280482,0.0002139084,0.00005190652,0.00028164426,0.07961617,0.0028361685,0.009220345],"genre_scores_gemma":[0.9159566,0.0002737578,0.030140454,0.00002002485,0.000015831085,0.0002610539,0.050056864,0.00013429948,0.0031412104],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99922824,0.00005660038,0.00006535653,0.00018073936,0.00040180355,0.00006725385],"domain_scores_gemma":[0.9973207,0.0008221925,0.0004816168,0.00027933333,0.00095748383,0.00013864553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007540297,0.0005972972,0.00033416515,0.0049156738,0.00028251443,0.0007652937,0.0005222659,0.0003355735,0.0022592184],"category_scores_gemma":[0.0032811938,0.00020728892,0.00042570152,0.0054158852,0.00016379703,0.00040895553,0.00031094917,0.00044233463,0.0009808658],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009614142,0.0006788616,0.53086144,0.0009144708,0.00014337631,0.0007144382,0.0018521108,0.087994665,0.01905005,0.0025812904,0.013917782,0.34033012],"study_design_scores_gemma":[0.00003418495,0.0003896781,0.7103535,0.00011936648,0.00006913523,0.0003566736,0.0016980947,0.23912023,0.017428832,0.0014016483,0.028936641,0.000091949696],"about_ca_topic_score_codex":0.036873426,"about_ca_topic_score_gemma":0.05108342,"teacher_disagreement_score":0.036873426,"about_ca_system_score_codex":0.0010467586,"about_ca_system_score_gemma":0.0012661013,"threshold_uncertainty_score":0.07331759},"labels":[],"label_agreement":null},{"id":"W2955292498","doi":"10.29173/mocs77","title":"An Optimized Prefabricated Raft Footing System for Houses on Shrink-Swell Soils: Preliminary Results","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Australian Research Council","keywords":"Prefabrication; Economic shortage; Swell; Engineering; Civil engineering; Sustainability; Geotechnical engineering; Geology","score_opus":0.007102474888381672,"score_gpt":0.1988262750153676,"score_spread":0.19172380012698592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955292498","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98207814,0.00012241778,0.016021932,0.000020097988,0.000041978023,0.0001376644,0.00022033142,0.0002201111,0.0011373648],"genre_scores_gemma":[0.9795124,0.000104293395,0.017768003,0.000008267153,0.000007661582,0.000042153453,0.00019199401,0.000025590754,0.0023395605],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997911,0.000016681164,0.000011031507,0.0000407269,0.000079598154,0.00006083907],"domain_scores_gemma":[0.99975353,0.000032433843,0.000037882466,0.000040181065,0.00009053233,0.000045340457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027348273,0.00052613294,0.000378711,0.00034941177,0.00027825715,0.00028237817,0.00043684652,0.00036891166,0.0026061311],"category_scores_gemma":[0.00041178626,0.00015635493,0.0004012744,0.00027169572,0.00017417726,0.00027645926,0.00024230653,0.00024674588,0.000423517],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008013732,0.0007096845,0.005768888,0.00061535096,0.000058474478,0.00057171885,0.00033133986,0.02638799,0.8667333,0.00023158867,0.0010576331,0.096732624],"study_design_scores_gemma":[0.00021830668,0.015914932,0.07333652,0.000046122335,0.00017515525,0.00052725355,0.000601294,0.08507261,0.8108724,0.00015673348,0.012955057,0.00012366776],"about_ca_topic_score_codex":0.0021345376,"about_ca_topic_score_gemma":0.0044535035,"teacher_disagreement_score":0.0026061311,"about_ca_system_score_codex":0.00024007155,"about_ca_system_score_gemma":0.00020659712,"threshold_uncertainty_score":0.008718371},"labels":[],"label_agreement":null},{"id":"W2955314730","doi":"10.29173/mocs90","title":"Integrating Computational Design to Improve the Design Workflow of Modular Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Architecture and Computational Design","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Modular design; Systems engineering; Computer science; Building information modeling; Software engineering; Quality (philosophy); Process (computing); Automation; Manufacturing engineering; Engineering; Database; Operations management; Scheduling (production processes)","score_opus":0.00685073752682679,"score_gpt":0.18406589306957938,"score_spread":0.17721515554275258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955314730","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0048216083,0.00010496823,0.98639584,0.00026613334,0.000053683438,0.00014944111,0.00009459875,0.0014072399,0.0067066043],"genre_scores_gemma":[0.047712598,0.0002425916,0.9485649,0.00008015706,0.000015862874,0.0002674556,0.0004572993,0.00077412283,0.0018851324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99657214,0.0012624086,0.00025406212,0.0003602568,0.0013444,0.00020670473],"domain_scores_gemma":[0.9946373,0.0022415211,0.00022560108,0.001666642,0.001030696,0.00019810171],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0051670303,0.0012272572,0.0008793029,0.0016434025,0.0010110644,0.0041958657,0.0020777914,0.0010991817,0.006389671],"category_scores_gemma":[0.010883072,0.0009464425,0.0017741886,0.001373057,0.0014848369,0.0024615221,0.004373148,0.002114721,0.002451571],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001444689,0.00020398994,0.0029637283,0.00084561924,0.00010205451,0.00046406226,0.0026300687,0.5515756,0.01673558,0.12729074,0.008128681,0.28891543],"study_design_scores_gemma":[0.00006672234,0.00011797534,0.00083672564,0.00031656015,0.0000534911,0.00026889733,0.00052793045,0.7356663,0.010793064,0.103495374,0.1477575,0.00009949993],"about_ca_topic_score_codex":0.003431968,"about_ca_topic_score_gemma":0.0051582693,"teacher_disagreement_score":0.006389671,"about_ca_system_score_codex":0.0014371722,"about_ca_system_score_gemma":0.0047674626,"threshold_uncertainty_score":0.027326226},"labels":[],"label_agreement":null},{"id":"W2955324818","doi":"10.29173/mocs132","title":"Investigating Stakeholders' Perceptions of Feasibility and Implications of Modular Construction-Based Post-Disaster Reconstruction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Modular design; Natural disaster; Flooding (psychology); Emergency management; Construction engineering; Engineering; Civil engineering; Risk analysis (engineering); Forensic engineering; Architectural engineering; Business; Computer science; Geography; Political science","score_opus":0.018344549640802527,"score_gpt":0.2115309248818566,"score_spread":0.19318637524105406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955324818","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98725116,0.00014383087,0.0023099417,0.0013692768,0.000021420406,0.00011068597,0.000021836284,0.000010760066,0.0087610055],"genre_scores_gemma":[0.99801445,0.00017193923,0.0011157203,0.000106483945,0.000002834885,0.00003725798,0.000012329797,0.0000034903949,0.0005353473],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9925269,0.004835662,0.0002611772,0.00022595048,0.0010597659,0.0010905926],"domain_scores_gemma":[0.9902879,0.0049687303,0.001301924,0.0003365981,0.0017366132,0.001368276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0103145875,0.00033359285,0.00019586789,0.0007116724,0.002038338,0.0020256995,0.0008111336,0.0013079958,0.003444172],"category_scores_gemma":[0.018189514,0.00026702468,0.00040237416,0.00046154822,0.0022287322,0.0021185472,0.002655944,0.0011714972,0.0003167765],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005489468,0.0013816574,0.20062394,0.002046687,0.000091867136,0.0069478406,0.59548426,0.0041406755,0.023422122,0.016419314,0.005270151,0.14362259],"study_design_scores_gemma":[0.000031888496,0.0010706409,0.076256245,0.0006708306,0.000048868216,0.0008191495,0.8814024,0.003592186,0.0024062553,0.0021465688,0.03146852,0.000086518725],"about_ca_topic_score_codex":0.002447286,"about_ca_topic_score_gemma":0.0044530914,"teacher_disagreement_score":0.0103145875,"about_ca_system_score_codex":0.0016309167,"about_ca_system_score_gemma":0.002414971,"threshold_uncertainty_score":0.054549396},"labels":[],"label_agreement":null},{"id":"W2955374397","doi":"10.29173/mocs100","title":"The Legacies of Manufacturing and Factories of Industrialised Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Australian Government","keywords":"Automotive industry; Factory (object-oriented programming); Vision; Engineering; Production (economics); Manufacturing; Outsourcing; Business; Manufacturing engineering; Industrial organization; Marketing; Computer science; Economics; Sociology","score_opus":0.0058411985311016025,"score_gpt":0.17355343397249917,"score_spread":0.16771223544139757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955374397","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.122506626,0.028504977,0.034290075,0.05551766,0.00094185834,0.000083167506,0.000166413,0.00015361872,0.75783557],"genre_scores_gemma":[0.9406059,0.008465658,0.006774732,0.003975554,0.00025416535,0.00007242601,0.00007181265,0.00009245334,0.039687276],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99708086,0.001267635,0.00010768928,0.00060253125,0.00053062814,0.0004106869],"domain_scores_gemma":[0.99889237,0.0005035914,0.00015624131,0.00020718637,0.00012358645,0.000116990996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022927108,0.00043038782,0.0002790257,0.001415012,0.005161097,0.010243123,0.0006710421,0.0026569194,0.007599645],"category_scores_gemma":[0.0027417764,0.0003912922,0.00027544607,0.0021867235,0.032597013,0.00790504,0.0043859915,0.004220932,0.00094952417],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026041265,0.000011932797,0.00068247254,0.000051875646,0.0000037786556,0.00013671532,0.011032083,0.0002568213,0.0001274796,0.9697362,0.0024204105,0.015514157],"study_design_scores_gemma":[0.000016659487,0.000082994535,0.005324835,0.0004364986,0.000009638224,0.0007263244,0.015842551,0.00042943796,0.0003686506,0.42672768,0.5499927,0.000042026222],"about_ca_topic_score_codex":0.00685804,"about_ca_topic_score_gemma":0.009400712,"teacher_disagreement_score":0.010243123,"about_ca_system_score_codex":0.0071405745,"about_ca_system_score_gemma":0.002687753,"threshold_uncertainty_score":0.051808774},"labels":[],"label_agreement":null},{"id":"W2955382699","doi":"10.29173/mocs95","title":"Serviceability Performance of Timber Concrete Composite Floors","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; FPInnovations","keywords":"Serviceability (structure); Structural engineering; Stiffness; Cross laminated timber; Slab; Structural system; Vibration; Engineering; Deflection (physics); Load bearing","score_opus":0.004045594960303004,"score_gpt":0.15727912462704002,"score_spread":0.153233529666737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955382699","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99835485,0.0000624169,0.0004574767,0.0000033217482,0.0000043249083,0.000004530628,0.00010473788,0.000022194536,0.000986088],"genre_scores_gemma":[0.9985246,0.00003179937,0.00023064073,0.0000038406392,9.4567145e-7,0.0000028645588,0.00013320435,0.00000931715,0.0010627452],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9996865,0.00002279217,0.000016562753,0.000052058233,0.00015507458,0.00006711922],"domain_scores_gemma":[0.99951816,0.00006566492,0.000053825057,0.000042264088,0.00021037579,0.000109677094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003900026,0.00034865993,0.00022220715,0.00066044374,0.00030087872,0.0002772263,0.0002814646,0.00026246218,0.0036353304],"category_scores_gemma":[0.0006030426,0.00014346697,0.00026140356,0.00033175206,0.00027026443,0.00029093202,0.00040079368,0.00029049357,0.00075537356],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009294488,0.00017451473,0.024191476,0.00011482869,0.000025031108,0.0002830461,0.00041660588,0.0124650495,0.92859626,0.00017041292,0.00021312569,0.032420278],"study_design_scores_gemma":[0.00002290644,0.004386202,0.2031903,0.000028984194,0.00005489721,0.00029526628,0.0007712021,0.013552411,0.77539855,0.00014261731,0.0021064242,0.00005020185],"about_ca_topic_score_codex":0.0039002781,"about_ca_topic_score_gemma":0.009430582,"teacher_disagreement_score":0.0039002781,"about_ca_system_score_codex":0.0003121411,"about_ca_system_score_gemma":0.00018902351,"threshold_uncertainty_score":0.012161374},"labels":[],"label_agreement":null},{"id":"W2955466431","doi":"10.29173/mocs112","title":"Data Analytics Application for Non-Conformance Reports in a Cabinet Manufacturing Facility","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Rework; Analytics; Computer science; Product (mathematics); Factory (object-oriented programming); Personalization; Database; Manufacturing engineering; Engineering; World Wide Web","score_opus":0.011121080700951908,"score_gpt":0.2086898818613051,"score_spread":0.1975688011603532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955466431","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31789201,0.0012024365,0.029290386,0.0016504374,0.00034209646,0.0012339752,0.5837292,0.058488008,0.006171435],"genre_scores_gemma":[0.2666025,0.0006302757,0.087959655,0.00023266353,0.00008648275,0.00054162816,0.6406635,0.0005849777,0.00269836],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9970041,0.00025369273,0.0003565515,0.000778417,0.0013835396,0.00022365151],"domain_scores_gemma":[0.9930473,0.0020286452,0.0008489265,0.0012930012,0.0022937153,0.00048840913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022439342,0.0011062013,0.00063048437,0.006365452,0.000861418,0.0021462485,0.0017063016,0.0009958327,0.001522599],"category_scores_gemma":[0.008423828,0.00028926812,0.00093099393,0.006522184,0.00045182116,0.0010481317,0.0011824173,0.0011909623,0.0015340421],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020298923,0.0021442694,0.27664068,0.004027106,0.00083970476,0.0062460564,0.005419637,0.04534829,0.049171735,0.0055042407,0.24182157,0.3608068],"study_design_scores_gemma":[0.00022991451,0.0004683667,0.42643064,0.0005457759,0.00022219839,0.0013075739,0.007017014,0.21916343,0.048190102,0.00368517,0.29246366,0.0002761517],"about_ca_topic_score_codex":0.115183555,"about_ca_topic_score_gemma":0.11466636,"teacher_disagreement_score":0.115183555,"about_ca_system_score_codex":0.0026626405,"about_ca_system_score_gemma":0.0036840441,"threshold_uncertainty_score":0.22902626},"labels":[],"label_agreement":null},{"id":"W2955501592","doi":"10.29173/mocs70","title":"A Collaborative Scheme for DFX Techniques in Concurrent Engineering Mitigated with Total Design Activity Model","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Product Development and Customization","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Concurrent engineering; Factory (object-oriented programming); Scheme (mathematics); Manufacturing engineering; Computer science; Machine tool; Systems engineering; Engineering; Industrial engineering; Operations management","score_opus":0.006325324029133782,"score_gpt":0.1821536452280195,"score_spread":0.17582832119888572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955501592","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053233737,0.00011909522,0.9841399,0.00031242386,0.000017444776,0.00025789905,0.00003291507,0.00015802792,0.00963886],"genre_scores_gemma":[0.15562993,0.00016092222,0.8401731,0.00006547593,0.0000094021125,0.00067898456,0.000096339805,0.00004554769,0.0031402127],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9884212,0.00675843,0.00076327013,0.001217583,0.0024564087,0.00038310152],"domain_scores_gemma":[0.9919011,0.003983415,0.000578187,0.001853068,0.0014071905,0.00027700633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0123629235,0.0011163045,0.0006102706,0.0036721565,0.002489641,0.003999651,0.0021783889,0.0012962982,0.0046177316],"category_scores_gemma":[0.012697636,0.0005858654,0.0016401456,0.0027744304,0.003906682,0.0055791633,0.0052685207,0.0018582668,0.00078993407],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008941273,0.00016229202,0.002684761,0.0005880589,0.00006871064,0.0001686672,0.0076352516,0.045822855,0.004517901,0.64448655,0.0020245404,0.29175106],"study_design_scores_gemma":[0.00010508927,0.00050884247,0.0019306723,0.0007143338,0.00014252315,0.0005930734,0.0039541447,0.3144392,0.0073801293,0.56022936,0.10987831,0.00012439118],"about_ca_topic_score_codex":0.0038453974,"about_ca_topic_score_gemma":0.005099163,"teacher_disagreement_score":0.0123629235,"about_ca_system_score_codex":0.004047693,"about_ca_system_score_gemma":0.0052845585,"threshold_uncertainty_score":0.06538218},"labels":[],"label_agreement":null},{"id":"W2955588086","doi":"10.29173/mocs91","title":"A Research Roadmap for Off-Site Construction: Automation and Robotics","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Robotics; Automation; Engineering management; Manufacturing engineering; Government (linguistics); Manufacturing; Engineering; Emerging technologies; Technology roadmap; Computer science; Artificial intelligence; Systems engineering; Robot; Process management; Business; Marketing","score_opus":0.012939396155194502,"score_gpt":0.236567965683315,"score_spread":0.2236285695281205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955588086","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006559593,0.20436881,0.11550499,0.31798017,0.0179647,0.004637142,0.0031794838,0.0035505733,0.32625458],"genre_scores_gemma":[0.08483787,0.32223436,0.42576164,0.024739292,0.0032390633,0.0051944484,0.012114152,0.0011146584,0.12076457],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9782478,0.0048392424,0.0015461956,0.0014513028,0.009607265,0.00430814],"domain_scores_gemma":[0.93705165,0.008277017,0.0017639836,0.0024717925,0.039538216,0.01089742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031084679,0.0031012886,0.0021827673,0.012806496,0.007470826,0.020638913,0.0050550266,0.011384108,0.031934958],"category_scores_gemma":[0.017529977,0.0013686775,0.0021117276,0.014674186,0.0067074774,0.018208317,0.012976072,0.009794914,0.017087337],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012165666,0.0004798728,0.0015631404,0.005283759,0.000036040157,0.00040431565,0.0013810942,0.003087224,0.0020045314,0.21095325,0.23479684,0.53988844],"study_design_scores_gemma":[0.000019616411,0.00019711854,0.0021306595,0.0033597206,0.000020786052,0.0001683944,0.0027123957,0.0010030665,0.00049447163,0.028152885,0.961672,0.00006879676],"about_ca_topic_score_codex":0.13135532,"about_ca_topic_score_gemma":0.13378103,"teacher_disagreement_score":0.13135532,"about_ca_system_score_codex":0.02635758,"about_ca_system_score_gemma":0.19711591,"threshold_uncertainty_score":0.26118147},"labels":[],"label_agreement":null},{"id":"W2955598428","doi":"10.29173/mocs78","title":"Highly Mechanical Performance of Laminated Veneer Lumber Induced by High Voltage Electrostatic Field","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Laminated veneer lumber; Composite material; Materials science; Veneer; Adhesive; Flexural strength; Delamination (geology); Shear strength (soil); Young's modulus; Polymerization; Polymer; Layer (electronics)","score_opus":0.003334290734529574,"score_gpt":0.16083104534698706,"score_spread":0.1574967546124575,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955598428","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987313,0.00027432243,0.0005613961,0.000012305161,0.0000085498,0.0000021794765,0.000026634798,0.000021199136,0.000362074],"genre_scores_gemma":[0.99838436,0.00010154797,0.0004102762,0.000018425148,0.0000033538947,0.0000038789162,0.00004462096,0.000006594358,0.001027035],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999944,0.0000060336133,0.000002149165,0.000012410787,0.000017182447,0.00001821837],"domain_scores_gemma":[0.9999387,0.000010568362,0.000017336633,0.000003653366,0.000016600985,0.000013190172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011786726,0.00024863158,0.00012039726,0.0001684236,0.00013290968,0.00016991259,0.000094196985,0.00018930469,0.0012199119],"category_scores_gemma":[0.000107815096,0.00009925244,0.00013387421,0.00009234678,0.00012367328,0.00016903738,0.0001172515,0.00021471715,0.00012724283],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019909143,0.0000047157573,0.00016923659,0.00001737782,0.0000015657065,0.000024043655,0.000014081189,0.000035982583,0.9989304,0.000011688767,0.0000137708685,0.00075728836],"study_design_scores_gemma":[0.000003899678,0.0002874198,0.010063439,0.000003674248,0.0000072007338,0.00006610364,0.00004293962,0.00046168183,0.9884421,0.000011519959,0.000605484,0.000004583582],"about_ca_topic_score_codex":0.00030492563,"about_ca_topic_score_gemma":0.0010661996,"teacher_disagreement_score":0.0012199119,"about_ca_system_score_codex":0.00012939089,"about_ca_system_score_gemma":0.00006531168,"threshold_uncertainty_score":0.004080951},"labels":[],"label_agreement":null},{"id":"W2955620045","doi":"10.29173/mocs99","title":"Calibrating CII RT283’s Modularization Critical Success Factor Accomplishments","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Texas at Austin","keywords":"Modular programming; Modular design; Critical success factor; Computer science; Sample (material); Project management; Estimation; Operations management; Engineering; Systems engineering; Knowledge management","score_opus":0.0064484960170310135,"score_gpt":0.20363059842499423,"score_spread":0.19718210240796322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955620045","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9681484,0.000029105362,0.014376913,0.000046758134,0.000008426291,0.0003078565,0.00048337912,0.00017687852,0.016422363],"genre_scores_gemma":[0.97474754,0.00004485315,0.022214025,0.000010265191,0.0000042390343,0.000380228,0.00097581936,0.00004423254,0.0015788588],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956102,0.00078386103,0.00035301878,0.00040367089,0.002503177,0.0003461568],"domain_scores_gemma":[0.976523,0.0062221037,0.0023649822,0.0020611028,0.011999678,0.00082908984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008270245,0.00083436526,0.00032378573,0.0048164492,0.0005598473,0.0012844176,0.00082456577,0.00042267184,0.0027076325],"category_scores_gemma":[0.028572487,0.0003391983,0.0004750888,0.0033526933,0.0005706232,0.00093955535,0.00129672,0.0005889935,0.0012637483],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003711668,0.0005346996,0.74135345,0.00022620555,0.00009070655,0.00020440976,0.006287441,0.022493314,0.011691288,0.002195486,0.0029613054,0.21159054],"study_design_scores_gemma":[0.000023718449,0.0008050652,0.9294363,0.00006284785,0.000036343135,0.000207746,0.0038294916,0.045866705,0.010085865,0.000692486,0.008890191,0.00006317721],"about_ca_topic_score_codex":0.012350482,"about_ca_topic_score_gemma":0.013374269,"teacher_disagreement_score":0.012350482,"about_ca_system_score_codex":0.002833242,"about_ca_system_score_gemma":0.0018516443,"threshold_uncertainty_score":0.04373777},"labels":[],"label_agreement":null},{"id":"W2955648368","doi":"10.29173/mocs129","title":"RFID-Integrated Software Platform for Construction Materials Management","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Global Positioning System; Kanban; Computer science; Systems engineering; Software; System integration; Database; Telecommunications; Engineering; Operating system","score_opus":0.005944652689611979,"score_gpt":0.1822361675474688,"score_spread":0.17629151485785682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955648368","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014805535,0.00062000786,0.8780511,0.00021269523,0.00020596324,0.00027480637,0.0006323203,0.08653846,0.018659152],"genre_scores_gemma":[0.3306545,0.0015144519,0.5754627,0.00076862954,0.00017062381,0.0008833299,0.0064979824,0.0061540287,0.07789382],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991008,0.000118904616,0.00008191132,0.00016138966,0.00042496956,0.00011201258],"domain_scores_gemma":[0.999302,0.00012958692,0.00007396679,0.00020428805,0.00021048861,0.00007964196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010424644,0.000864878,0.0005989956,0.0012795122,0.00033111792,0.0017383891,0.0018483221,0.0010459004,0.009776187],"category_scores_gemma":[0.0016212711,0.00046765245,0.00068534305,0.00094255403,0.0003277883,0.0017655443,0.0017278707,0.0011706081,0.008815625],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00095334667,0.0007912092,0.0035766582,0.00072625524,0.00017566296,0.0010346808,0.0007950563,0.02493038,0.13555124,0.04443043,0.05088024,0.7361549],"study_design_scores_gemma":[0.00022639551,0.00077169325,0.00511905,0.0002927893,0.00021374824,0.0015632706,0.00024600583,0.34964234,0.1661816,0.026185887,0.44929573,0.00026156282],"about_ca_topic_score_codex":0.00084875745,"about_ca_topic_score_gemma":0.00051801826,"teacher_disagreement_score":0.009776187,"about_ca_system_score_codex":0.00040536816,"about_ca_system_score_gemma":0.00075945526,"threshold_uncertainty_score":0.03270459},"labels":[],"label_agreement":null},{"id":"W2955661343","doi":"10.29173/mocs125","title":"Characterisation of the Lateral Resistance of Stapled Shear Walls","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Tree Root and Stability Studies","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"Division of Materials Research; Natural Sciences and Engineering Research Council of Canada; Government of Canada; Université Laval","keywords":"Shear wall; Structural engineering; Framing (construction); Shear (geology); Engineering; Shear force; Steel design; Geotechnical engineering; Materials science; Composite material","score_opus":0.004536184181384987,"score_gpt":0.1674900031676226,"score_spread":0.16295381898623762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955661343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99763644,0.00021682917,0.0015282981,0.0000044277162,0.000008532645,0.000012455745,0.00012610258,0.000017905235,0.0004489034],"genre_scores_gemma":[0.99700975,0.0002069261,0.0014000672,0.000012271633,0.0000037372297,0.000018908866,0.00020050151,0.0000133496,0.0011344684],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997125,0.000028084656,0.000018828983,0.000042455813,0.00016756711,0.000030543284],"domain_scores_gemma":[0.9992767,0.0001922689,0.0001372964,0.000059540434,0.00025662454,0.00007754258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023544698,0.00027192483,0.00018969407,0.0005257582,0.00012915113,0.00027037525,0.00023077083,0.00028672858,0.0012405277],"category_scores_gemma":[0.00076204876,0.00013194318,0.00020114143,0.00028626886,0.00021506914,0.00025274517,0.00026970793,0.00024990257,0.00026748815],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006199887,0.000020317819,0.0020701794,0.000044576882,0.0000060795433,0.00008736723,0.00009368328,0.0005271301,0.9942063,0.00001930561,0.000020067653,0.0028429853],"study_design_scores_gemma":[0.000009155122,0.0010707205,0.055331413,0.000025866944,0.000028645862,0.00023804659,0.0005173128,0.0038844072,0.9374113,0.0000447718,0.0014145161,0.000023835679],"about_ca_topic_score_codex":0.0003744735,"about_ca_topic_score_gemma":0.00061425386,"teacher_disagreement_score":0.0012405277,"about_ca_system_score_codex":0.00007692323,"about_ca_system_score_gemma":0.000086370404,"threshold_uncertainty_score":0.0041499734},"labels":[],"label_agreement":null},{"id":"W2955753883","doi":"10.29173/mocs76","title":"Canadian Mass Timber Demonstration Projects Initiatives","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Natural Resources Canada","funders":"","keywords":"Green building; Architectural engineering; Engineering; Government (linguistics); Order (exchange); Civil engineering; Business; Construction engineering; Engineering management; Finance","score_opus":0.006191631200782012,"score_gpt":0.1672424841155234,"score_spread":0.1610508529147414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955753883","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11822503,0.0022193436,0.00580799,0.012857051,0.0009709218,0.0021665033,0.009460903,0.0013174894,0.8469748],"genre_scores_gemma":[0.3540427,0.0026435836,0.013038801,0.0028662446,0.00011796038,0.00093706057,0.007602297,0.00029180638,0.6184595],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975249,0.00016610046,0.000021264124,0.00016958114,0.0012920144,0.00082607416],"domain_scores_gemma":[0.9966455,0.00013701664,0.000062931416,0.00013195425,0.0016196285,0.0014028758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019931924,0.0006394053,0.00019778135,0.0011526912,0.008003426,0.002242277,0.001491104,0.0010349492,0.040307883],"category_scores_gemma":[0.0019584768,0.00035235562,0.0003598927,0.0015699511,0.001126933,0.0006000029,0.00304396,0.0016513467,0.003397962],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032365453,0.0005927316,0.011073672,0.00041149862,0.000042245854,0.0010667047,0.0034537625,0.0015212004,0.009169975,0.0638945,0.7491619,0.1592882],"study_design_scores_gemma":[0.000055447534,0.000104663784,0.024327436,0.00006811934,0.000013726086,0.00010788292,0.0027559225,0.0005664636,0.001961058,0.0008923987,0.9691153,0.000031547555],"about_ca_topic_score_codex":0.93951035,"about_ca_topic_score_gemma":0.9881557,"teacher_disagreement_score":0.060489655,"about_ca_system_score_codex":0.02590385,"about_ca_system_score_gemma":0.10177652,"threshold_uncertainty_score":0.1879465},"labels":[],"label_agreement":null},{"id":"W2955810178","doi":"10.29173/mocs114","title":"Case Study: Off-site manufacturing of EIFS Panelized Wall Assemblies to Gain Efficiency in Construction Sequencing","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Engineering; Envelope (radar); Quality (philosophy); Control (management); Transport engineering; Manufacturing engineering; Process (computing); Architectural engineering; Civil engineering; Construction engineering; Computer science; Operating system","score_opus":0.010688073499358868,"score_gpt":0.20870563810626339,"score_spread":0.1980175646069045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955810178","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9834368,0.000029032484,0.009707773,0.000056040513,0.000008739733,0.00012691952,0.00014490738,0.00006905655,0.0064207497],"genre_scores_gemma":[0.96503454,0.00005172052,0.030716185,0.00001997298,0.0000043321993,0.000060572802,0.00016776158,0.000039267652,0.0039056398],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9984403,0.00048273007,0.00007296459,0.00017776863,0.00058539526,0.00024084642],"domain_scores_gemma":[0.9975171,0.0010890884,0.00022826508,0.0005885443,0.00037854683,0.00019844729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017924886,0.00053423765,0.00038093605,0.0008727421,0.0013248445,0.00086887256,0.00096639834,0.0011997609,0.0038523395],"category_scores_gemma":[0.0029800665,0.00034713343,0.00059278595,0.0009573245,0.00076620036,0.0005937184,0.0009127246,0.00075436826,0.0006413079],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0027504796,0.0057040416,0.16368048,0.0011627512,0.00013949363,0.034298092,0.02150599,0.267896,0.16355713,0.009587832,0.00570108,0.32401666],"study_design_scores_gemma":[0.0003666605,0.01456939,0.31512704,0.00033064227,0.00021935618,0.015591203,0.054289743,0.17116717,0.3521857,0.004652798,0.07124,0.00026035978],"about_ca_topic_score_codex":0.0053848587,"about_ca_topic_score_gemma":0.019368289,"teacher_disagreement_score":0.0053848587,"about_ca_system_score_codex":0.0011954387,"about_ca_system_score_gemma":0.0010626029,"threshold_uncertainty_score":0.012887359},"labels":[],"label_agreement":null},{"id":"W2955851017","doi":"10.29173/mocs88","title":"Lean as an Integrator of Modular Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Workflow; Lean construction; Lean project management; Factory (object-oriented programming); Process (computing); Manufacturing engineering; Lean manufacturing; Systems engineering; Engineering; Process management; Integrator; Lean laboratory; Computer science; Construction engineering; Construction industry","score_opus":0.004184313196084121,"score_gpt":0.18379407093432187,"score_spread":0.17960975773823776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955851017","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058760714,0.0016333775,0.742727,0.003028248,0.000311842,0.0002624343,0.000110191744,0.0015973543,0.19156888],"genre_scores_gemma":[0.55012465,0.0016796984,0.40561607,0.0005815992,0.00016236631,0.0002598655,0.00018492607,0.00042471246,0.040966075],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.996335,0.0010672398,0.00016500421,0.00038654517,0.0017339614,0.00031222065],"domain_scores_gemma":[0.99582386,0.0011180474,0.0005628801,0.0009441001,0.0010941286,0.0004568551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004949197,0.00069172285,0.00035687638,0.0024929317,0.0010158994,0.005074928,0.0013371112,0.0009393481,0.0058966675],"category_scores_gemma":[0.0047659446,0.0005511338,0.0006333164,0.0017077447,0.0034869765,0.0055997567,0.004885971,0.0013151397,0.0012406347],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107380736,0.00011803594,0.0034120923,0.00033671613,0.000044906705,0.0003945712,0.0026382075,0.013670092,0.0048707966,0.8177329,0.0032805884,0.15339367],"study_design_scores_gemma":[0.000066133325,0.0005237208,0.0035254227,0.0006409022,0.00009314277,0.00088811404,0.002972833,0.061168905,0.00846223,0.6398107,0.28175732,0.000090632304],"about_ca_topic_score_codex":0.0014535257,"about_ca_topic_score_gemma":0.0018959028,"teacher_disagreement_score":0.0058966675,"about_ca_system_score_codex":0.0021129528,"about_ca_system_score_gemma":0.0040985392,"threshold_uncertainty_score":0.026174188},"labels":[],"label_agreement":null},{"id":"W2955865348","doi":"10.29173/mocs97","title":"Mass Timber Modular Construction: Developments in Oregon","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Food and Agriculture; TallWood Design Institute; U.S. Department of Agriculture","keywords":"Modular design; Architectural engineering; Engineering; Government (linguistics); Scale (ratio); Frame (networking); Civil engineering; Business; Computer science; Telecommunications; Geography","score_opus":0.0040666031071489445,"score_gpt":0.169194541185728,"score_spread":0.16512793807857906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955865348","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46154585,0.0019478999,0.0034647533,0.0030002345,0.00017470756,0.0001261576,0.00096409785,0.00027518297,0.5285011],"genre_scores_gemma":[0.7940595,0.0046973205,0.011866667,0.00068075943,0.000070968286,0.000102622194,0.0016774134,0.0002120272,0.18663278],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99969363,0.000023124428,0.00001354159,0.0000530673,0.00013699602,0.00007952416],"domain_scores_gemma":[0.99961144,0.00006394035,0.00004635869,0.000039363666,0.000096068616,0.00014293939],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058401696,0.00023096915,0.00006468584,0.0008730016,0.0019566184,0.0019969721,0.0007840037,0.00042935825,0.021313496],"category_scores_gemma":[0.0006162032,0.00020624936,0.0002816568,0.001166275,0.0011836585,0.001808338,0.0019612862,0.0011250114,0.001226379],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047537065,0.0017238415,0.10951902,0.00042994763,0.00002843335,0.008215427,0.01108925,0.0024941086,0.016329281,0.16791502,0.06062212,0.62115824],"study_design_scores_gemma":[0.000023273327,0.00031032346,0.098284766,0.0003372121,0.000019088513,0.0019079814,0.012379489,0.0010988783,0.0051839314,0.0045899414,0.87582374,0.000041456915],"about_ca_topic_score_codex":0.03293331,"about_ca_topic_score_gemma":0.17721336,"teacher_disagreement_score":0.03293331,"about_ca_system_score_codex":0.0031475455,"about_ca_system_score_gemma":0.0022835713,"threshold_uncertainty_score":0.071300745},"labels":[],"label_agreement":null},{"id":"W2955871541","doi":"10.29173/mocs138","title":"Developing an Analytical Solution that Mimics Simulation Modeling for Construction Planning: Earthwork Case","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Earthworks; Benchmark (surveying); Plan (archaeology); Computer science; Field (mathematics); Industrial engineering; Operations research; Engineering; Mathematics; Geology","score_opus":0.04006334564664626,"score_gpt":0.26153334331250294,"score_spread":0.22146999766585668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955871541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041878138,0.000095306284,0.9413955,0.0004011278,0.000051568764,0.00018542698,0.00035888518,0.00050435436,0.015129623],"genre_scores_gemma":[0.5566831,0.00028090473,0.43553856,0.000097797485,0.000028353139,0.0005768921,0.0003247865,0.0001242633,0.0063452846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994536,0.0002044087,0.000036709327,0.00009295448,0.00014381674,0.00006852877],"domain_scores_gemma":[0.9985293,0.00084522873,0.00017009949,0.00011781245,0.00028987983,0.000047627233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011353899,0.00072206423,0.00068684405,0.0011148719,0.00077070144,0.0016918089,0.0014995363,0.0020453872,0.0057311947],"category_scores_gemma":[0.003536251,0.00056978216,0.00077040587,0.0010338977,0.000510905,0.0009960058,0.001009647,0.0010794387,0.0007152512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020196381,0.00006047211,0.000843322,0.00006311939,0.000011168765,0.00019358163,0.00008352508,0.9624229,0.00093710585,0.02200823,0.0006295797,0.012726802],"study_design_scores_gemma":[0.000005821516,0.000013894484,0.000118952696,0.000013471017,0.0000052083105,0.00003619047,0.000044311942,0.99428916,0.0005415404,0.0033392669,0.0015848966,0.0000073048886],"about_ca_topic_score_codex":0.014843825,"about_ca_topic_score_gemma":0.013032341,"teacher_disagreement_score":0.014843825,"about_ca_system_score_codex":0.0012414067,"about_ca_system_score_gemma":0.0025227712,"threshold_uncertainty_score":0.02951485},"labels":[],"label_agreement":null},{"id":"W2955898963","doi":"10.29173/mocs136","title":"Investigation of Influencing Factors on Air Leakage of Canadian Dwellings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Leakage (economics); Indoor air quality; Environmental science; Sizing; Energy consumption; Thermal; Engineering; Environmental engineering; Meteorology; Geography","score_opus":0.007329734469517746,"score_gpt":0.1548725652597151,"score_spread":0.14754283079019737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955898963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9970592,0.00023529158,0.0002257593,0.000039212606,0.0000036447254,0.000019799512,0.0008106968,0.000009142405,0.0015972804],"genre_scores_gemma":[0.9979638,0.00024897003,0.00042429267,0.000013594746,0.0000020272917,0.000007702327,0.00057798944,0.000004628115,0.0007569334],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.999311,0.00004248792,0.000039108425,0.00011269206,0.00034047457,0.0001542648],"domain_scores_gemma":[0.9989237,0.000086977474,0.00019042956,0.00004240367,0.0006646575,0.00009172637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033290024,0.0004167417,0.00023307872,0.0013383395,0.001650648,0.00067055534,0.0005191475,0.00017241959,0.0010512067],"category_scores_gemma":[0.0011005915,0.00018065135,0.00050605246,0.0024553789,0.0005158832,0.0002434695,0.0004886993,0.0002240995,0.00012038739],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009434005,0.000030397356,0.9730459,0.000112418915,0.000042246284,0.0003342396,0.0019188311,0.00048668552,0.002700247,0.00014438096,0.00058329146,0.020507107],"study_design_scores_gemma":[6.064962e-7,0.000015348585,0.9973597,0.000009789025,0.000015162002,0.00005641722,0.0011599292,0.00022880244,0.00035896368,0.000010465908,0.00077631674,0.000008532295],"about_ca_topic_score_codex":0.9376676,"about_ca_topic_score_gemma":0.9752833,"teacher_disagreement_score":0.06233239,"about_ca_system_score_codex":0.008315952,"about_ca_system_score_gemma":0.0069371625,"threshold_uncertainty_score":0.12539893},"labels":[],"label_agreement":null},{"id":"W2955909757","doi":"10.29173/mocs94","title":"A Pilot Study of Identifying Execution Plan Differences for Accelerated Bridge Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Plan (archaeology); Computer science; Preference; Process management; Operations management; Transport engineering; Engineering; Medicine","score_opus":0.038054593446177294,"score_gpt":0.23284344296574985,"score_spread":0.19478884951957257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955909757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99784446,0.00002960246,0.0005478532,0.00005114676,0.000008937724,0.000630537,0.000055352164,0.000004170698,0.0008278982],"genre_scores_gemma":[0.9907244,0.00011777018,0.0057213963,0.000087644396,0.000008912292,0.0020491655,0.00014457603,0.000006324265,0.0011399485],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9944765,0.0026483946,0.0006053532,0.00053096557,0.0011133194,0.0006255206],"domain_scores_gemma":[0.95157766,0.026849143,0.006365133,0.0021175337,0.010842759,0.0022477317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015155169,0.00035892782,0.000504987,0.0015080078,0.001403441,0.0018984528,0.0008338971,0.0008490203,0.0033797575],"category_scores_gemma":[0.039745037,0.00048208493,0.00066158455,0.001367583,0.0009760676,0.001912249,0.0010383278,0.0015585248,0.0003996264],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00371316,0.041100524,0.5264823,0.0019612685,0.00017933208,0.00247803,0.2091479,0.0014448385,0.011902061,0.0039897817,0.0024122337,0.19518848],"study_design_scores_gemma":[0.00046801692,0.028069394,0.7078097,0.00041893157,0.00016397392,0.00043294666,0.24389002,0.0028342868,0.0040810187,0.00105206,0.010654196,0.00012549017],"about_ca_topic_score_codex":0.003652641,"about_ca_topic_score_gemma":0.008314626,"teacher_disagreement_score":0.015155169,"about_ca_system_score_codex":0.0028004344,"about_ca_system_score_gemma":0.0054927715,"threshold_uncertainty_score":0.080149114},"labels":[],"label_agreement":null},{"id":"W2955916540","doi":"10.29173/mocs122","title":"Numerical Modelling Analysis of Angle Bracket Connections Used in Cross Laminated Timber Constructions","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Bracket; Cross laminated timber; Fastener; Structural engineering; Finite element method; Dissipative system; Phase angle (astronomy); Computer science; Engineering; Physics","score_opus":0.009861921545997587,"score_gpt":0.20555725224224267,"score_spread":0.1956953306962451,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955916540","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91915244,0.00021540701,0.068212464,0.00005057428,0.00003072776,0.00006372795,0.0002000782,0.00018775792,0.011886913],"genre_scores_gemma":[0.9867654,0.00012501796,0.01145076,0.0000053665685,0.000003257973,0.000042951164,0.000080354075,0.000021781416,0.0015050434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997788,0.000044443164,0.000014766832,0.00003650931,0.000096169046,0.000029332725],"domain_scores_gemma":[0.9997366,0.00011637306,0.000060858674,0.0000292034,0.000046841647,0.000010071312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002917584,0.00036777815,0.00032229975,0.0005287361,0.00027743488,0.00057090825,0.00045807814,0.00066771207,0.0015141251],"category_scores_gemma":[0.00070005906,0.0001958989,0.00031885898,0.00047204623,0.00049832376,0.00034361222,0.00024897864,0.00018545336,0.0003206056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055173183,0.000044717053,0.0030820626,0.000077303266,0.000008924658,0.00017240495,0.0001225006,0.9472346,0.038052574,0.0015271748,0.00016051588,0.009462132],"study_design_scores_gemma":[0.0000054281854,0.000093890194,0.0026668978,0.000012944231,0.0000077225595,0.00006156624,0.000056307024,0.98885274,0.0071783857,0.00028440478,0.0007708135,0.00000893086],"about_ca_topic_score_codex":0.0017942335,"about_ca_topic_score_gemma":0.001878437,"teacher_disagreement_score":0.0017942335,"about_ca_system_score_codex":0.00035068425,"about_ca_system_score_gemma":0.0003731487,"threshold_uncertainty_score":0.005065322},"labels":[],"label_agreement":null},{"id":"W2955930255","doi":"10.29173/mocs117","title":"Decision-making for Cross-Laminated Timber Modular Construction Logistics Using Discrete Event Simulation","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Supply chain; Modular construction; Discrete event simulation; Process (computing); Modularity (biology); Event (particle physics); Work (physics); Engineering; Cross laminated timber; Construction engineering; Computer science; Civil engineering; Business; Simulation; Mechanical engineering","score_opus":0.009764285313812465,"score_gpt":0.2647800476268293,"score_spread":0.2550157623130168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955930255","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3067875,0.00039845277,0.67715734,0.0012640138,0.0001274001,0.00060207973,0.00088518596,0.0003960802,0.012381922],"genre_scores_gemma":[0.9653404,0.00021897147,0.030567108,0.00007648043,0.000017249034,0.00033543026,0.00030858704,0.000023257355,0.0031126412],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998415,0.00092693354,0.00006619604,0.00019417376,0.00015436522,0.00024330492],"domain_scores_gemma":[0.9873022,0.010856387,0.0006527258,0.0001462275,0.00056000863,0.0004825054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004042205,0.0012803223,0.001758037,0.0011149368,0.0007339802,0.0027775115,0.0017140174,0.0021674156,0.0057196585],"category_scores_gemma":[0.0074442173,0.0011871199,0.0016769862,0.0009456813,0.0010714526,0.0012663165,0.0015367834,0.0022438308,0.0002564606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040540803,0.000019410107,0.00031607508,0.0000096544245,0.000011295996,0.000022381222,0.000007952442,0.99808455,0.000055411227,0.00087838416,0.000038898757,0.0005154172],"study_design_scores_gemma":[0.000007879809,0.000011644238,0.000043274817,0.0000016584203,0.000003244225,0.0000011488287,0.000008960325,0.9994467,0.000040291274,0.00039272406,0.0000401265,0.0000022387871],"about_ca_topic_score_codex":0.02563298,"about_ca_topic_score_gemma":0.013053026,"teacher_disagreement_score":0.02563298,"about_ca_system_score_codex":0.002225115,"about_ca_system_score_gemma":0.0030467978,"threshold_uncertainty_score":0.050967574},"labels":[],"label_agreement":null},{"id":"W2955960142","doi":"10.29173/mocs141","title":"Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Visualization; Modular design; Vehicle routing problem; Computer science; Building information modeling; Integrated logistics support; Systems engineering; Routing (electronic design automation); Transport engineering; Operations research; Process management; Engineering; Operations management; Data mining; Embedded system","score_opus":0.009553049174982588,"score_gpt":0.21051484241603066,"score_spread":0.20096179324104807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955960142","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086497605,0.00014203526,0.9034799,0.00021955531,0.000026642754,0.00011519635,0.00036387861,0.0023815269,0.0067736623],"genre_scores_gemma":[0.5618766,0.00027357126,0.43436742,0.000025051288,0.000007879987,0.00016361717,0.00063211255,0.00012354017,0.0025301895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998123,0.000056792687,0.000010227701,0.00003262524,0.000060210965,0.000027876964],"domain_scores_gemma":[0.9998529,0.00004642595,0.00001778339,0.00001879725,0.00004619453,0.0000178711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040229148,0.00070619624,0.00042479165,0.0011698746,0.00031380038,0.0011104039,0.0005840075,0.00041948294,0.0025175489],"category_scores_gemma":[0.00068898784,0.0004126083,0.0006495165,0.0010519375,0.00020248262,0.00071545294,0.0009651262,0.0003689115,0.0003574774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008625555,0.000069936534,0.0023886152,0.00005163154,0.000023496057,0.00013359751,0.00013329195,0.9037265,0.004519379,0.004962978,0.0015963436,0.08230805],"study_design_scores_gemma":[0.0000046681394,0.000012627379,0.0003912024,0.0000038857893,0.0000041430694,0.000018162436,0.000039254403,0.99697375,0.00089911063,0.0007551652,0.0008924608,0.000005675296],"about_ca_topic_score_codex":0.009389556,"about_ca_topic_score_gemma":0.009118806,"teacher_disagreement_score":0.009389556,"about_ca_system_score_codex":0.0005686317,"about_ca_system_score_gemma":0.0012246835,"threshold_uncertainty_score":0.018669784},"labels":[],"label_agreement":null},{"id":"W2955994317","doi":"10.29173/mocs133","title":"Strategies for Building Information Modelling Adoption in the South African Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cronbach's alpha; Procurement; Building information modeling; Business; Work (physics); Construction industry; Questionnaire; Process management; Test (biology); Process (computing); Knowledge management; Marketing; Operations management; Engineering; Construction engineering; Computer science","score_opus":0.009374625203429156,"score_gpt":0.1903746049770553,"score_spread":0.18099997977362614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955994317","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94255984,0.0010506889,0.009447713,0.007005975,0.000012588032,0.00022269327,0.000045756464,0.000058715326,0.039596092],"genre_scores_gemma":[0.9910787,0.0009372968,0.005874397,0.00013568907,0.0000018035295,0.00004715722,0.000024958552,0.000010583528,0.0018893935],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99527514,0.0026903325,0.00026997106,0.0002458809,0.00082223647,0.0006964691],"domain_scores_gemma":[0.9949772,0.0029620253,0.00088295416,0.0003467453,0.0004967735,0.00033439428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004936964,0.000491712,0.00019616357,0.002976439,0.0025504294,0.0053055678,0.0007337655,0.00095932867,0.0030025141],"category_scores_gemma":[0.008977614,0.000526725,0.00035929555,0.0035154668,0.0017055179,0.0029515983,0.004755536,0.0010476026,0.00040733695],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014457444,0.00052537787,0.1064237,0.0011833478,0.00005725459,0.004489169,0.4366593,0.002273675,0.012226342,0.055836495,0.0025168788,0.37766385],"study_design_scores_gemma":[0.000049346632,0.00045076155,0.11426943,0.002846401,0.00014276688,0.0036409288,0.6444159,0.009325111,0.0116334725,0.016992228,0.19608189,0.00015176584],"about_ca_topic_score_codex":0.007858357,"about_ca_topic_score_gemma":0.009167318,"teacher_disagreement_score":0.007858357,"about_ca_system_score_codex":0.0033653534,"about_ca_system_score_gemma":0.0067315698,"threshold_uncertainty_score":0.026109457},"labels":[],"label_agreement":null},{"id":"W2956000842","doi":"10.29173/mocs71","title":"Automatic Material Estimation by Translating BIM Data into ERP Readable Data for Panelized Residential Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Computer science; Prefabrication; Estimation; Process (computing); Cost estimate; Building information modeling; Production (economics); Resource (disambiguation); Systems engineering; Industrial engineering; Engineering; Scheduling (production processes); Civil engineering; Operations management","score_opus":0.014025071660805018,"score_gpt":0.22944036954830616,"score_spread":0.21541529788750113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956000842","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033094246,0.0001030034,0.9322078,0.00013595243,0.00007022139,0.00026592036,0.0011596555,0.02869723,0.0042660963],"genre_scores_gemma":[0.20814535,0.00019373116,0.7838018,0.00008622312,0.000033910997,0.0003525404,0.0035866613,0.0008120223,0.0029877846],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999252,0.00013729458,0.000071837356,0.00017789923,0.00031823432,0.000042661708],"domain_scores_gemma":[0.999035,0.00026500647,0.000091584996,0.00022540515,0.00035671692,0.00002637794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079164054,0.00065623055,0.00046572468,0.0022888798,0.0003674135,0.001134423,0.00078246545,0.0004006672,0.004633904],"category_scores_gemma":[0.002372674,0.00046018724,0.00040868274,0.0018495946,0.0001963507,0.001195413,0.0008788217,0.00047006476,0.002514606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029643773,0.00023284824,0.004897373,0.00023956767,0.0000484836,0.0005829464,0.00036922898,0.018377982,0.07768651,0.0040470776,0.01752528,0.87569624],"study_design_scores_gemma":[0.00010862279,0.000262629,0.023947272,0.00012730405,0.00010260942,0.0008991552,0.00062650914,0.7065,0.18802339,0.005102631,0.07404317,0.00025675423],"about_ca_topic_score_codex":0.0021067464,"about_ca_topic_score_gemma":0.0019192976,"teacher_disagreement_score":0.004633904,"about_ca_system_score_codex":0.00035383625,"about_ca_system_score_gemma":0.0006648911,"threshold_uncertainty_score":0.015501976},"labels":[],"label_agreement":null},{"id":"W2956001012","doi":"10.29173/mocs115","title":"Toward Community Generation: Energy Simulation and Performance Evaluation of Multi-family Solar PV Settings for Energy-efficient Homes in Edmonton, Canada","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Smart Grid Energy Management","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Photovoltaic system; Renewable energy; Environmental economics; Environmental science; Greenhouse gas; Solar energy; Grid; Distributed generation; Meteorology; Engineering; Electrical engineering; Economics; Geography","score_opus":0.02351932681421245,"score_gpt":0.21375214208538668,"score_spread":0.19023281527117422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956001012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9824057,0.00013395697,0.0046749115,0.0001722407,0.000021536895,0.00014309601,0.00087418256,0.00019709094,0.011377253],"genre_scores_gemma":[0.99256927,0.00008168256,0.0037336494,0.000023798222,0.0000020777486,0.000046868026,0.0006643739,0.000021815933,0.0028564024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997733,0.000053128242,0.0000056718027,0.00002905679,0.000051138562,0.00008762308],"domain_scores_gemma":[0.99954504,0.00015511845,0.000020093286,0.0000229331,0.00019298139,0.00006366461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006573128,0.00079123775,0.00057441264,0.0006116084,0.001279617,0.0009710644,0.0013870628,0.0008571093,0.0025285364],"category_scores_gemma":[0.00096257834,0.0003767912,0.0006469853,0.00094038865,0.00057178555,0.00044818677,0.0005638575,0.0006475732,0.00020006686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015660666,0.00024372095,0.0071031014,0.000042095202,0.000020333226,0.00014388617,0.00006767988,0.9849857,0.0005095225,0.0006613737,0.0009991785,0.005066752],"study_design_scores_gemma":[0.00005562907,0.000059354283,0.0030227818,0.000007017157,0.00000888569,0.000009880124,0.00020760093,0.99533683,0.0005086138,0.00014794126,0.00062475994,0.000010821244],"about_ca_topic_score_codex":0.87667084,"about_ca_topic_score_gemma":0.8876797,"teacher_disagreement_score":0.12332916,"about_ca_system_score_codex":0.00764273,"about_ca_system_score_gemma":0.0064667054,"threshold_uncertainty_score":0.24811089},"labels":[],"label_agreement":null},{"id":"W2956053921","doi":"10.29173/mocs72","title":"Research on Roles Transformation of Stakeholder in the Industry Chain of Industrialized Building in China Based on Niche Theory","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chongqing University","keywords":"Industrialisation; Stakeholder; China; Business; Industrial organization; Division of labour; Chain (unit); Economic system; Economic geography; Economics; Management; Political science; Market economy","score_opus":0.1133153160279495,"score_gpt":0.3638496145292905,"score_spread":0.250534298501341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956053921","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.972132,0.0014029492,0.004896463,0.0012375305,0.000015426693,0.00007320848,0.000032491982,0.0000066006687,0.020203259],"genre_scores_gemma":[0.99836355,0.0005201547,0.00038602197,0.000025485386,0.0000021790502,0.000013009612,0.000014795118,6.4747695e-7,0.0006741884],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985649,0.0005816164,0.0000721498,0.0001458612,0.00034350992,0.00029191398],"domain_scores_gemma":[0.9985643,0.00063380506,0.0002398185,0.000053642823,0.0003556087,0.00015280601],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020653433,0.00019967734,0.00016704686,0.0024232906,0.002064563,0.0020010627,0.000499209,0.00042949742,0.0019926745],"category_scores_gemma":[0.0025073027,0.00014904967,0.0003005284,0.002941737,0.0013964223,0.0033168697,0.0014014996,0.0003732937,0.000066534114],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001363236,0.0003025641,0.36662778,0.0013187298,0.000105917,0.003878061,0.12598278,0.0065103155,0.006558339,0.26602954,0.0019674099,0.22058223],"study_design_scores_gemma":[0.000032263815,0.00046365501,0.4718524,0.0011378637,0.0001511381,0.0010356935,0.36457604,0.03881954,0.005051976,0.059791043,0.056985624,0.00010274954],"about_ca_topic_score_codex":0.017160794,"about_ca_topic_score_gemma":0.027111243,"teacher_disagreement_score":0.017160794,"about_ca_system_score_codex":0.0055395155,"about_ca_system_score_gemma":0.0058064093,"threshold_uncertainty_score":0.040192246},"labels":[],"label_agreement":null},{"id":"W2956122367","doi":"10.29173/mocs127","title":"Effect of Loading Speed on the Mechanical Properties of Nail Joints","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Wood Treatment and Properties","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"FPInnovations; University of Victoria","funders":"","keywords":"Nail (fastener); Materials science; Structural engineering; Shear (geology); Composite material; Engineering","score_opus":0.008247849711584772,"score_gpt":0.17315292008509117,"score_spread":0.1649050703735064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956122367","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99899584,0.00024460402,0.00035249005,0.000009431904,0.000011368641,0.0000098716155,0.000039982257,0.000016458649,0.00032004496],"genre_scores_gemma":[0.99784315,0.00022565793,0.0010705093,0.000017045864,0.000006069769,0.000015023224,0.00007840678,0.000021517271,0.0007225181],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999458,0.000108716835,0.00007803333,0.00009885545,0.00016406721,0.000092324786],"domain_scores_gemma":[0.99708265,0.0012363491,0.000510192,0.00033455843,0.00063858414,0.00019762332],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066333654,0.0007906947,0.0004045345,0.0005925877,0.0002892254,0.00037636168,0.00031773924,0.0005556859,0.002852141],"category_scores_gemma":[0.0026603774,0.0004830863,0.00030437816,0.00051988754,0.0005490499,0.0005528308,0.00034185074,0.00038700673,0.00035696468],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014298202,0.00015015651,0.010664129,0.00017158063,0.000022155671,0.0002703395,0.00034806965,0.002038655,0.97397715,0.000031438904,0.00009372212,0.010802772],"study_design_scores_gemma":[0.000023541184,0.0039094794,0.11725444,0.000034765082,0.0000970867,0.000224703,0.0007023188,0.00314214,0.8733302,0.000035823003,0.0011865553,0.00005883896],"about_ca_topic_score_codex":0.00096950255,"about_ca_topic_score_gemma":0.002095179,"teacher_disagreement_score":0.002852141,"about_ca_system_score_codex":0.0002083816,"about_ca_system_score_gemma":0.00022142968,"threshold_uncertainty_score":0.009541392},"labels":[],"label_agreement":null},{"id":"W2969102903","doi":"10.29173/mocs118","title":"Appraisal of Strategy Adopted by Construction Professionals for Coping with Stress","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Johannesburg","keywords":"Coping (psychology); Psychology; Data collection; Applied psychology; Clinical psychology; Sociology","score_opus":0.025919902685607857,"score_gpt":0.37613925124432135,"score_spread":0.3502193485587135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969102903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9881765,0.0010705903,0.0020946534,0.0012594425,0.000053599193,0.00012320757,0.000025085503,0.000015833726,0.007181105],"genre_scores_gemma":[0.9940428,0.0018477531,0.0024989897,0.00017176697,0.000014074421,0.00004490686,0.00003793772,0.0000049634914,0.0013367406],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99751544,0.0011645758,0.00017500343,0.0000956088,0.0006924425,0.00035691846],"domain_scores_gemma":[0.9966485,0.0009189013,0.00075971556,0.00007940246,0.0010149122,0.00057867455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020402495,0.0005108022,0.00025675443,0.0014907164,0.0010524382,0.001977645,0.0003459154,0.0009165402,0.0009711804],"category_scores_gemma":[0.006027946,0.00023003753,0.00033231743,0.0006957418,0.0009080474,0.0005297417,0.0010944209,0.0006012076,0.00021202784],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029098603,0.00064950273,0.47132647,0.0015968163,0.00015593984,0.0042790235,0.27192795,0.0005795981,0.024281064,0.0028977436,0.0041298787,0.21788499],"study_design_scores_gemma":[0.000036575544,0.0011128782,0.4042139,0.0011584928,0.00009451808,0.004434171,0.5598816,0.0017312303,0.003307752,0.001756126,0.022130655,0.00014203737],"about_ca_topic_score_codex":0.0021271564,"about_ca_topic_score_gemma":0.003951766,"teacher_disagreement_score":0.0021271564,"about_ca_system_score_codex":0.0008445555,"about_ca_system_score_gemma":0.0021178436,"threshold_uncertainty_score":0.01078999},"labels":[],"label_agreement":null},{"id":"W3111788575","doi":"10.29173/mocs248","title":"Front matter, MOC Summit 2019 Proceedings","year":2020,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Modular design; Library science; Engineering; Political science; Computer science; Geography; Physical geography; Operating system; Mechanical engineering","score_opus":0.00638476383546657,"score_gpt":0.18698358148494143,"score_spread":0.18059881764947486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3111788575","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00073639554,0.0035362763,0.0006664622,0.014640819,0.03271789,0.00011796866,0.003984441,0.0005404639,0.9430593],"genre_scores_gemma":[0.0020573032,0.0016576236,0.0002835394,0.0011043159,0.0024390423,0.00003307054,0.002030557,0.00022668643,0.99016786],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99880373,0.00004880618,0.00003993018,0.00008728384,0.00085067726,0.00016956615],"domain_scores_gemma":[0.99727315,0.0001580859,0.000050961517,0.00013160765,0.0016196966,0.00076643354],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013694448,0.0012002924,0.00057708455,0.0019514812,0.0028010334,0.006631384,0.0011523301,0.0025421712,0.5422742],"category_scores_gemma":[0.0033270752,0.00027955536,0.00048397822,0.0015796904,0.0008278918,0.0016885978,0.001906212,0.0023133613,0.3775393],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009358891,0.000009330282,0.000029511992,0.000029640469,6.470043e-7,0.000009967285,0.000005716039,0.00003770414,0.00004628268,0.0005275342,0.988111,0.011183114],"study_design_scores_gemma":[0.0000025257486,0.0000045171273,0.00021135606,0.000043478656,8.445591e-7,0.0000063638563,0.000027648235,0.00003751939,0.0000571144,0.00028985427,0.99931574,0.0000030237268],"about_ca_topic_score_codex":0.05878492,"about_ca_topic_score_gemma":0.16529587,"teacher_disagreement_score":0.5422742,"about_ca_system_score_codex":0.0045852587,"about_ca_system_score_gemma":0.0065832105,"threshold_uncertainty_score":0.6528903},"labels":[],"label_agreement":null},{"id":"W3113011181","doi":"10.29173/mocs188","title":"A Framework for Comparative Evaluation of the Life Cycle Sustainability of Modular and Conventional Buildings","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Process (computing); Multiple-criteria decision analysis; Engineering; Factory (object-oriented programming); Modular construction; Life-cycle assessment; Architectural engineering; Construction engineering; Key (lock); Systems engineering; Computer science; Operations research; Production (economics)","score_opus":0.03029052058977919,"score_gpt":0.27301491978421866,"score_spread":0.24272439919443947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113011181","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034117945,0.0078333635,0.86405003,0.0018410785,0.00017177292,0.0017688915,0.00077755033,0.00028830543,0.0891511],"genre_scores_gemma":[0.41415897,0.0031451636,0.57810974,0.000150207,0.000058021626,0.002067459,0.00047523557,0.00004674518,0.0017884627],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9883083,0.0075729834,0.0005581436,0.00058989454,0.002414105,0.0005565729],"domain_scores_gemma":[0.9925247,0.0044085872,0.0007216745,0.00030495584,0.0017884423,0.000251683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015862027,0.0015757527,0.0011067427,0.014362131,0.0013500866,0.0059704906,0.0024583556,0.0013245903,0.0039043264],"category_scores_gemma":[0.013983942,0.0003500885,0.0016158834,0.009085028,0.0036945147,0.005325106,0.0036277114,0.0013907294,0.00033163253],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000076004704,0.00023810154,0.0027823446,0.0012292102,0.000107037435,0.0002572567,0.0015268784,0.06797484,0.0015358974,0.8294611,0.0022868495,0.09252448],"study_design_scores_gemma":[0.000076640965,0.0010091967,0.0075034406,0.0032524993,0.00022801169,0.0005041296,0.011286854,0.24983357,0.0030813464,0.6225955,0.10041417,0.00021465932],"about_ca_topic_score_codex":0.01035734,"about_ca_topic_score_gemma":0.009027686,"teacher_disagreement_score":0.015862027,"about_ca_system_score_codex":0.010487359,"about_ca_system_score_gemma":0.0074747773,"threshold_uncertainty_score":0.08388746},"labels":[],"label_agreement":null},{"id":"W3114067184","doi":"10.29173/mocs242","title":"Front matter, 2016 MOC Summit proceedings","year":2016,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Modular design; Political science; Geography; Computer science; Meteorology; Physical geography; Operating system","score_opus":0.005974345350090887,"score_gpt":0.19114914004325637,"score_spread":0.18517479469316547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114067184","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012594323,0.0016256863,0.00048207724,0.009785788,0.01100601,0.00007701843,0.0033862265,0.00044328315,0.9719345],"genre_scores_gemma":[0.0030235837,0.00095667347,0.00025400202,0.00045056114,0.00081253215,0.000025251244,0.0016670185,0.0001424333,0.992668],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99913543,0.000043838256,0.000030677205,0.00008171909,0.0006004378,0.0001078583],"domain_scores_gemma":[0.9980539,0.0000942386,0.000058037014,0.00009956694,0.0010117663,0.00068242784],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009012651,0.0007011554,0.0003807447,0.0016289024,0.0022593464,0.0055818385,0.0007918047,0.0017133362,0.54892474],"category_scores_gemma":[0.0029495445,0.00018114396,0.0002626254,0.0011975146,0.0008060034,0.0017439548,0.0026270172,0.001393728,0.38526657],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022358478,0.000023006805,0.00016783114,0.000067233595,9.92011e-7,0.00003925731,0.000040051942,0.000046976646,0.000120547964,0.0016510544,0.95175785,0.046062957],"study_design_scores_gemma":[0.0000022146723,0.000004127173,0.00044396854,0.000070949754,6.0553054e-7,0.000013500704,0.00006785567,0.00003322166,0.00008794191,0.00045987286,0.9988133,0.0000024803537],"about_ca_topic_score_codex":0.022028808,"about_ca_topic_score_gemma":0.095410794,"teacher_disagreement_score":0.54892474,"about_ca_system_score_codex":0.003019917,"about_ca_system_score_gemma":0.0045275115,"threshold_uncertainty_score":0.6434041},"labels":[],"label_agreement":null},{"id":"W3114351658","doi":"10.29173/mocs240","title":"Front Matter, 2018 MOC Summit proceedings","year":2018,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Summit; Hollywood; Front (military); Modular design; Engineering; Political science; History; Computer science; Geography; Art history; Physical geography; Operating system; Mechanical engineering","score_opus":0.007392005693353505,"score_gpt":0.19658651180212025,"score_spread":0.18919450610876676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114351658","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011490041,0.0011333338,0.0006622212,0.0084304875,0.0076874634,0.000069587346,0.0031052814,0.0006297227,0.9771329],"genre_scores_gemma":[0.0032702328,0.00077085436,0.0003693758,0.00052112126,0.00082079874,0.00004156419,0.0019530293,0.00021218802,0.9920407],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930227,0.00004107359,0.000022148812,0.0000727503,0.0004666267,0.00009513798],"domain_scores_gemma":[0.99830246,0.00010126741,0.000055063545,0.00008837343,0.00089388335,0.00055889215],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008087611,0.00065849285,0.00036251696,0.0017422803,0.0020071885,0.005284276,0.00085755135,0.0016989075,0.6143345],"category_scores_gemma":[0.0027171373,0.00015173657,0.0002262408,0.0010143791,0.0006657226,0.0020609745,0.002607388,0.0014392807,0.4414699],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017814478,0.000025693198,0.00011185744,0.000054927383,7.452483e-7,0.000034417517,0.000032724747,0.000031391945,0.000108688204,0.0014853346,0.95202184,0.04607461],"study_design_scores_gemma":[0.0000024307305,0.000004592065,0.00034275802,0.000058601225,6.2807607e-7,0.000012937657,0.00006008212,0.000041518004,0.000094767136,0.00050904736,0.99887043,0.0000020721916],"about_ca_topic_score_codex":0.007992035,"about_ca_topic_score_gemma":0.037583128,"teacher_disagreement_score":0.6143345,"about_ca_system_score_codex":0.0022131242,"about_ca_system_score_gemma":0.00272101,"threshold_uncertainty_score":0.550105},"labels":[],"label_agreement":null},{"id":"W3114709915","doi":"10.29173/mocs177","title":"Modularization Business Case Analysis Tool: Learning from Industry Practices","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Process (computing); Computer science; Process management; Software engineering; Scope (computer science); Business case; Business process; Business analysis; Operations management; Engineering; Business model; Work in process; Business; Marketing; Programming language","score_opus":0.020773948248158272,"score_gpt":0.2196472760852575,"score_spread":0.1988733278370992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114709915","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024638016,0.0007062187,0.9162015,0.0046822103,0.00019960119,0.0017723251,0.0017308302,0.011232746,0.038836654],"genre_scores_gemma":[0.03945631,0.0006619293,0.9519542,0.0002551461,0.000046911704,0.00093568966,0.0020757013,0.00083447224,0.0037795922],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98845685,0.0049552363,0.0012379752,0.0011293826,0.003774398,0.00044612118],"domain_scores_gemma":[0.9396512,0.04114269,0.00213408,0.0058873934,0.010047895,0.0011367301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019502815,0.002091141,0.0009901989,0.008261633,0.0018451808,0.008066889,0.00479329,0.0017643992,0.009315956],"category_scores_gemma":[0.05847605,0.0012617944,0.0014722084,0.0055087935,0.0017633061,0.008875418,0.0059119603,0.0037776541,0.0052877907],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000119743454,0.0011871075,0.006218824,0.001654217,0.00009546435,0.0011365695,0.018580182,0.011415986,0.0051753703,0.0744422,0.06979261,0.8101817],"study_design_scores_gemma":[0.00034910307,0.00048764006,0.0068629645,0.006108875,0.00014394152,0.002151412,0.016401267,0.11650912,0.015503622,0.19448769,0.6405821,0.00041232718],"about_ca_topic_score_codex":0.002373166,"about_ca_topic_score_gemma":0.00429739,"teacher_disagreement_score":0.019502815,"about_ca_system_score_codex":0.002860073,"about_ca_system_score_gemma":0.004428433,"threshold_uncertainty_score":0.10314202},"labels":[],"label_agreement":null},{"id":"W3117344091","doi":"10.29173/mocs246","title":"An Innovated Integrated Prefabricated Quarter System for the Migrant On-site Construction Workers of China","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Central University of Finance and Economics; National Natural Science Foundation of China","keywords":"China; Quarter (Canadian coin); Business; Government (linguistics); Workforce; Migrant workers; Construction industry; Economic growth; Rural area; Economic shortage; Engineering; Geography; Political science; Economics","score_opus":0.04429361487906643,"score_gpt":0.3542414912552957,"score_spread":0.3099478763762293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3117344091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9056355,0.00090701645,0.07406435,0.00073126,0.00024192227,0.00097429426,0.00024661992,0.0012301186,0.015968973],"genre_scores_gemma":[0.925362,0.00048800843,0.061459333,0.00012331469,0.000041908042,0.00029465204,0.00030594406,0.000034916444,0.01188998],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99934715,0.00011313765,0.000061064966,0.00012665136,0.00018324987,0.00016867656],"domain_scores_gemma":[0.9994867,0.00002144184,0.00006079532,0.00007942002,0.00019676112,0.00015489431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010496336,0.00044792815,0.00027951854,0.0006373868,0.0013778796,0.0007870484,0.0012954102,0.00067505846,0.0051147095],"category_scores_gemma":[0.00080189866,0.0001908725,0.00046030566,0.00049964455,0.00040481845,0.00092793914,0.0024533991,0.00030800546,0.000847634],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001380639,0.0017815453,0.1278894,0.0013441208,0.00007705574,0.0018148461,0.007193782,0.015837006,0.08282999,0.0072084297,0.013840589,0.7388025],"study_design_scores_gemma":[0.0010426781,0.015252582,0.35255125,0.00097454665,0.0007373775,0.004383269,0.0278581,0.23878966,0.06240358,0.00799517,0.28739646,0.0006153321],"about_ca_topic_score_codex":0.0066148164,"about_ca_topic_score_gemma":0.007501203,"teacher_disagreement_score":0.0066148164,"about_ca_system_score_codex":0.00079248514,"about_ca_system_score_gemma":0.0027857004,"threshold_uncertainty_score":0.017110407},"labels":[],"label_agreement":null},{"id":"W3119199326","doi":"10.29173/mocs178","title":"Modularization Business Case: Process Flowchart and Major Considerations","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Flowchart; Computer science; Schedule; Process (computing); Process management; Risk analysis (engineering); Software engineering; Engineering; Business; Programming language","score_opus":0.06703827011217275,"score_gpt":0.3142190966494526,"score_spread":0.24718082653727982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119199326","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07162753,0.000660185,0.75206566,0.009584867,0.0002560727,0.010870296,0.001807517,0.0032117595,0.14991611],"genre_scores_gemma":[0.2666376,0.0010608919,0.6899168,0.0007225098,0.00006430485,0.00428464,0.0015105164,0.0002658612,0.035536867],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99628025,0.0013802904,0.00019837405,0.00030114016,0.0014974568,0.00034257796],"domain_scores_gemma":[0.99284405,0.0045812135,0.0004892661,0.0004975561,0.0012500408,0.00033786174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006008851,0.0009239827,0.00036121416,0.002493654,0.0018504437,0.0062854,0.0017101511,0.0022667528,0.014031854],"category_scores_gemma":[0.009734715,0.0006770084,0.00057791383,0.0019808984,0.0017773372,0.0041750115,0.0015652501,0.0018779463,0.0029645152],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005207376,0.001887626,0.0057569398,0.00077227067,0.000021145377,0.0045771734,0.009549256,0.056548182,0.019380258,0.6648137,0.02530291,0.21086982],"study_design_scores_gemma":[0.00031070376,0.0010312904,0.0075835497,0.0018152174,0.000049035832,0.002483011,0.0072081652,0.22738162,0.03448943,0.19088367,0.5264221,0.00034229262],"about_ca_topic_score_codex":0.008466137,"about_ca_topic_score_gemma":0.0073442548,"teacher_disagreement_score":0.014031854,"about_ca_system_score_codex":0.004567642,"about_ca_system_score_gemma":0.0073620435,"threshold_uncertainty_score":0.04694122},"labels":[],"label_agreement":null},{"id":"W3120476599","doi":"10.29173/mocs162","title":"Implementation of Prefabrication and Modular Offsite Construction using BIM and Lean Construction Techniques","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Lean construction; Engineering; Construction management; Schedule; Construction engineering; Productivity; Construction waste; Building information modeling; Construction industry; Architectural engineering; Transport engineering; Operations management; Civil engineering; Computer science; Waste management","score_opus":0.01466718059163039,"score_gpt":0.23346497834709798,"score_spread":0.2187977977554676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120476599","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35687584,0.00083979627,0.5245908,0.002412656,0.000067371235,0.0032058826,0.00008269089,0.0003991319,0.11152585],"genre_scores_gemma":[0.5404357,0.0006797286,0.45256868,0.00021311238,0.000011588337,0.00064933865,0.00013825191,0.000040661456,0.0052630026],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9816914,0.010354066,0.00075973466,0.0006146053,0.005462718,0.0011175522],"domain_scores_gemma":[0.99254805,0.0029809095,0.00088564685,0.0012557162,0.0019714292,0.00035830305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016911099,0.00081998407,0.0003825502,0.0024497362,0.0016656893,0.0024762165,0.0018390784,0.0010589729,0.0014827895],"category_scores_gemma":[0.010422419,0.00041614703,0.00073672127,0.0015878894,0.0022227776,0.0036747847,0.0043410854,0.001437277,0.00033588204],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010460618,0.0011307622,0.0128848,0.0012704701,0.000042165997,0.00093316927,0.027879799,0.021855038,0.021686768,0.06831826,0.0023418635,0.8415523],"study_design_scores_gemma":[0.00016536175,0.0071176942,0.10870257,0.0074314964,0.00016863746,0.005973471,0.13090475,0.11890548,0.07969602,0.12392358,0.41653025,0.0004807201],"about_ca_topic_score_codex":0.0027018867,"about_ca_topic_score_gemma":0.007475368,"teacher_disagreement_score":0.016911099,"about_ca_system_score_codex":0.0031378907,"about_ca_system_score_gemma":0.01016637,"threshold_uncertainty_score":0.08943552},"labels":[],"label_agreement":null},{"id":"W3121749086","doi":"10.29173/mocs241","title":"Front matter, 2015 MOC Summit proceedings","year":2015,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Summit; Front (military); Modular design; Political science; Engineering; Computer science; Geography; Operating system; Physical geography; Mechanical engineering","score_opus":0.009094887801055232,"score_gpt":0.20975921333359598,"score_spread":0.20066432553254077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121749086","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012424985,0.0015830301,0.00054092245,0.00977031,0.0094113685,0.000071209695,0.0032474622,0.0004609161,0.9736723],"genre_scores_gemma":[0.0040208073,0.00088391267,0.00030071064,0.0007344054,0.00078819896,0.000030027975,0.0019276671,0.00014179891,0.9911725],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991854,0.000044596498,0.000025678899,0.000078660494,0.0005595118,0.00010614666],"domain_scores_gemma":[0.99827063,0.00009808236,0.000045856174,0.0000792137,0.00092884083,0.00057742],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00090966246,0.0006249707,0.00035428567,0.0017493456,0.0023655635,0.0055614477,0.00084341434,0.0017708171,0.547028],"category_scores_gemma":[0.0028777542,0.00017069903,0.00025109103,0.0011095433,0.0008011746,0.0016539855,0.002504198,0.0013463713,0.34065214],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001572649,0.000018809778,0.0001191591,0.000050895254,8.9636444e-7,0.000030715742,0.000031927928,0.000035653382,0.00008260327,0.0016606032,0.96317977,0.03477322],"study_design_scores_gemma":[0.0000022251625,0.0000045881116,0.0005059525,0.00006997119,7.2662476e-7,0.000011361533,0.000072183706,0.00003889977,0.000083332416,0.0005064268,0.9987017,0.0000026152666],"about_ca_topic_score_codex":0.022204723,"about_ca_topic_score_gemma":0.10274546,"teacher_disagreement_score":0.452972,"about_ca_system_score_codex":0.0032301315,"about_ca_system_score_gemma":0.004356508,"threshold_uncertainty_score":0.6461096},"labels":[],"label_agreement":null},{"id":"W3133047794","doi":"10.29173/mocs243","title":"Front matter, 2017 MOC Summit proceedings","year":2017,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Geology; Geography; Physical geography; Oceanography","score_opus":0.01020518121897918,"score_gpt":0.2128277905106247,"score_spread":0.20262260929164552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133047794","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023451447,0.0021045732,0.0010311274,0.016765103,0.014200675,0.000102688646,0.0044911355,0.0007189857,0.9582405],"genre_scores_gemma":[0.0074538854,0.0016229934,0.00056244544,0.000945242,0.0016771401,0.00006398581,0.00335835,0.00031616713,0.9839998],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99903524,0.00006537626,0.000029786323,0.00007907164,0.00064929295,0.00014127293],"domain_scores_gemma":[0.9975854,0.00016210359,0.00007586949,0.00012388868,0.0012097929,0.0008428818],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0011084777,0.0007300357,0.00041133096,0.0020248313,0.0022439181,0.0060996977,0.00083638675,0.0016989277,0.45357096],"category_scores_gemma":[0.0030380054,0.00017079509,0.00027477226,0.0013264561,0.0009701137,0.002266553,0.0030161364,0.0016297518,0.2773125],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020784153,0.000025658639,0.00020345535,0.00007403305,0.0000013910259,0.000039373066,0.000049566595,0.000047470432,0.00011774676,0.0022037416,0.956166,0.04105066],"study_design_scores_gemma":[0.00000298322,0.000006025385,0.0005804617,0.00008375577,0.0000013010321,0.000016026817,0.00014595332,0.00007522956,0.00015954161,0.0008321366,0.99809283,0.0000036336942],"about_ca_topic_score_codex":0.011016922,"about_ca_topic_score_gemma":0.04922509,"teacher_disagreement_score":0.54642904,"about_ca_system_score_codex":0.0027684565,"about_ca_system_score_gemma":0.005013335,"threshold_uncertainty_score":0.7794147},"labels":[],"label_agreement":null},{"id":"W3138039968","doi":"10.29173/mocs153","title":"Defined Variables for Modular Construction Multi Project Scheduling","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Scheduling (production processes); Schedule; Modular construction; Computer science; Engineering; Manufacturing engineering; Systems engineering; Operations research; Industrial engineering; Operations management; Operating system","score_opus":0.02627763193702548,"score_gpt":0.22907776078354458,"score_spread":0.2028001288465191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138039968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048142917,0.0010959657,0.9318584,0.00032802002,0.0001643367,0.0008527591,0.0011972117,0.00022206422,0.016138399],"genre_scores_gemma":[0.44616064,0.0010809832,0.54460096,0.000090475085,0.0000830555,0.0017537356,0.0017813181,0.000102347134,0.0043465607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9966534,0.0016147599,0.00032863236,0.00043354594,0.0007042117,0.00026550287],"domain_scores_gemma":[0.99589753,0.0022136024,0.0007922517,0.0001547223,0.00081748,0.00012447032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038841614,0.0012116521,0.00069812825,0.0019264413,0.00064131,0.002148112,0.0011948028,0.00057120976,0.004493996],"category_scores_gemma":[0.007363699,0.0002827637,0.00086572894,0.003409417,0.0005730341,0.0018757657,0.00088002544,0.0012458753,0.00044016525],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028856975,0.00034270252,0.011896124,0.0013131851,0.00015124698,0.00022030284,0.00087310217,0.53136355,0.003890398,0.2600179,0.0055609355,0.18408193],"study_design_scores_gemma":[0.000086024374,0.000746623,0.009137619,0.00044193884,0.00015151505,0.00019044032,0.001295977,0.8192035,0.006608373,0.09322087,0.06880966,0.00010751478],"about_ca_topic_score_codex":0.0035192638,"about_ca_topic_score_gemma":0.0035417073,"teacher_disagreement_score":0.004493996,"about_ca_system_score_codex":0.0023950464,"about_ca_system_score_gemma":0.002991159,"threshold_uncertainty_score":0.020541668},"labels":[],"label_agreement":null},{"id":"W3138296130","doi":"10.29173/mocs50","title":"Near Optimum Selection of Module Configuration for Efficient Modular Construction","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Index (typography); Scheduling (production processes); Computer science; Selection (genetic algorithm); Reliability engineering; Engineering; Transport engineering; Systems engineering; Industrial engineering; Operations management","score_opus":0.011036560272583427,"score_gpt":0.20388319248715936,"score_spread":0.19284663221457593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138296130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62354255,0.00019354126,0.35991266,0.00004515438,0.000018626006,0.00011902213,0.00016440066,0.00042328844,0.015580651],"genre_scores_gemma":[0.921294,0.00010322045,0.07717641,0.000010379718,0.000005744988,0.00005555262,0.00019544493,0.000091337126,0.001067938],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992599,0.00017908608,0.000043459273,0.00010758386,0.0003036087,0.00010629732],"domain_scores_gemma":[0.99945146,0.0001227899,0.00013216809,0.000079233236,0.00016200896,0.00005233163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086878985,0.0007582104,0.0005488215,0.0016077124,0.00034425454,0.00069574354,0.00036751543,0.00034767346,0.002295342],"category_scores_gemma":[0.0015350465,0.00023987136,0.00038286266,0.00089659705,0.00031879425,0.00083445315,0.0009076578,0.0002227948,0.0006525932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034028024,0.00022578832,0.05831761,0.00034008134,0.00009957275,0.00048411012,0.00029388198,0.3553134,0.22277407,0.01151819,0.0021785963,0.3481144],"study_design_scores_gemma":[0.000056092707,0.0017821303,0.117607415,0.00009453641,0.00017653493,0.0012643929,0.0010098686,0.59957635,0.2440626,0.015933461,0.018279396,0.00015720385],"about_ca_topic_score_codex":0.00038469143,"about_ca_topic_score_gemma":0.0014236111,"teacher_disagreement_score":0.002295342,"about_ca_system_score_codex":0.0002899413,"about_ca_system_score_gemma":0.00049549696,"threshold_uncertainty_score":0.0076786876},"labels":[],"label_agreement":null},{"id":"W3154708143","doi":"10.29173/mocs150","title":"Learning from Previous BIM-Based Modular Construction Cases: Qualitative Comparative Analysis Approach","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Modular construction; Computer science; Building information modeling; Causality (physics); Risk analysis (engineering); Management science; Process management; Engineering; Operations management; Business","score_opus":0.035834368538964316,"score_gpt":0.25765509462239666,"score_spread":0.22182072608343234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154708143","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65796494,0.0017346202,0.20496348,0.0030293195,0.00012180037,0.0062017976,0.001568582,0.00012421238,0.12429127],"genre_scores_gemma":[0.88445705,0.0011987884,0.10663745,0.0002339773,0.000013194408,0.0032443344,0.00059542916,0.000029402725,0.0035903542],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9809131,0.01403664,0.0007270187,0.0008387105,0.0027884338,0.00069615967],"domain_scores_gemma":[0.9584782,0.033424657,0.0015280173,0.0014062573,0.0048272954,0.00033548358],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026643937,0.00060426636,0.0007473607,0.008915525,0.0034104262,0.004515908,0.0027573826,0.0013206651,0.0053949202],"category_scores_gemma":[0.03795321,0.00045079316,0.000693739,0.00997241,0.005451937,0.006081308,0.004171752,0.0010766299,0.00040347115],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032816763,0.00081304065,0.016178492,0.0030212405,0.000098606455,0.0020159732,0.38374978,0.008923355,0.003267265,0.32962665,0.0040016402,0.24797584],"study_design_scores_gemma":[0.00011062502,0.0005295757,0.012950777,0.0030173867,0.00015171345,0.00051818625,0.79681134,0.017308675,0.006834425,0.09746005,0.06416873,0.0001385129],"about_ca_topic_score_codex":0.0065549864,"about_ca_topic_score_gemma":0.013101503,"teacher_disagreement_score":0.026643937,"about_ca_system_score_codex":0.014489362,"about_ca_system_score_gemma":0.0064906306,"threshold_uncertainty_score":0.14090824},"labels":[],"label_agreement":null},{"id":"W3169202935","doi":"10.29173/mocs152","title":"Workspace Optimization for Modular Off-site Assembly","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Workspace; Factory (object-oriented programming); Process (computing); Unit (ring theory); Production line; Manufacturing engineering; Constraint (computer-aided design); Computer science; Engineering; Production (economics); Object (grammar); Industrial engineering; Operations management; Mechanical engineering; Artificial intelligence; Mathematics; Operating system","score_opus":0.013288641024158762,"score_gpt":0.20746108200847302,"score_spread":0.19417244098431424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169202935","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07382888,0.00053049787,0.91362613,0.000096379306,0.000055877605,0.0000687242,0.0001287051,0.00041524135,0.011249581],"genre_scores_gemma":[0.7704329,0.0004806013,0.21909165,0.000047562906,0.000033097782,0.00017244577,0.00038421768,0.0002166398,0.00914097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995944,0.00011631379,0.0000147655155,0.000082892344,0.00010237752,0.00008931809],"domain_scores_gemma":[0.99962306,0.00013354927,0.00007350471,0.0000500289,0.0000716592,0.000048198388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061422365,0.0012341659,0.0010508127,0.0009970987,0.0003450158,0.0006184752,0.00092390925,0.0005781576,0.004853775],"category_scores_gemma":[0.0012094957,0.0003397538,0.0009184368,0.00072157755,0.0003957964,0.000643417,0.0012342834,0.00050623383,0.0006016395],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015810777,0.00010651004,0.0012013892,0.00017017139,0.000028351109,0.00015414607,0.00007391404,0.9187426,0.0062294067,0.006622602,0.0014017748,0.06511098],"study_design_scores_gemma":[0.000017214841,0.0001789969,0.00085855275,0.000016797916,0.0000128303955,0.000060607512,0.000037987662,0.99115807,0.0016880187,0.004399663,0.0015617509,0.000009579629],"about_ca_topic_score_codex":0.002018747,"about_ca_topic_score_gemma":0.0019005979,"teacher_disagreement_score":0.004853775,"about_ca_system_score_codex":0.00046120497,"about_ca_system_score_gemma":0.00059647,"threshold_uncertainty_score":0.016237557},"labels":[],"label_agreement":null},{"id":"W3175478755","doi":"10.29173/mocs192","title":"Behavior of Double Fish Plate Connector between Steel Plate Shear Wall Structure and Steel Frame","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Steel plate shear wall; Cable gland; Structural engineering; Shear wall; Materials science; Dissipation; Ductility (Earth science); Shear (geology); Stiffness; Composite material; Engineering; Mechanical engineering","score_opus":0.017194459955162226,"score_gpt":0.2160270995071223,"score_spread":0.19883263955196007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3175478755","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9967257,0.00008962649,0.0025048477,0.000013031968,0.000014304056,0.000011481658,0.000024373405,0.00006146905,0.00055527815],"genre_scores_gemma":[0.99762493,0.000038262144,0.0014629898,0.000009601162,0.0000024736228,0.0000051486286,0.000058265512,0.00001741928,0.0007808451],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99925476,0.00009440113,0.00004258037,0.00015128277,0.00031644263,0.00014057025],"domain_scores_gemma":[0.998718,0.0001967242,0.00033436704,0.00018077304,0.00040506787,0.00016521914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052032503,0.00081291754,0.00031707893,0.00095594185,0.00030224666,0.00033750175,0.00049000775,0.0006598183,0.002360077],"category_scores_gemma":[0.0017850099,0.00039422314,0.0003453946,0.0004750519,0.00057328294,0.00068689545,0.0004744466,0.0002969653,0.00048700246],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023755105,0.000042289714,0.010897492,0.000095640586,0.000021532569,0.0010947271,0.00039514212,0.0026001055,0.9755681,0.00021994744,0.00017652201,0.008650904],"study_design_scores_gemma":[0.000044684642,0.0046922225,0.14224531,0.00005102513,0.00012201705,0.0029633294,0.0011626167,0.0392102,0.80509114,0.00021733974,0.004098468,0.000101558566],"about_ca_topic_score_codex":0.0008831982,"about_ca_topic_score_gemma":0.0023639614,"teacher_disagreement_score":0.002360077,"about_ca_system_score_codex":0.0002695979,"about_ca_system_score_gemma":0.00025528032,"threshold_uncertainty_score":0.007895231},"labels":[],"label_agreement":null},{"id":"W3178222712","doi":"10.29173/mocs181","title":"Key Considerations before Integrating Modular Construction: Adaptation to the Traditional French Construction Processes","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Product Development and Customization","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Modular programming; Process management; Complementarity (molecular biology); Computer science; Process (computing); Key (lock); Modularity (biology); Order (exchange); Operations management; Business; Engineering","score_opus":0.028846047129300452,"score_gpt":0.19875690588501652,"score_spread":0.16991085875571607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3178222712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48849857,0.00498498,0.12931696,0.049826417,0.00062621944,0.0012696093,0.00009597759,0.0005368118,0.32484442],"genre_scores_gemma":[0.9296376,0.001509596,0.052642994,0.0018560983,0.00013569168,0.00020780328,0.000067252826,0.00009163758,0.013851512],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9910198,0.0050207344,0.00029146773,0.00045704,0.0020225774,0.0011884951],"domain_scores_gemma":[0.9917841,0.0037145321,0.0006913979,0.00096913957,0.0023271309,0.00051367783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0101294415,0.00075258216,0.00025151845,0.0011452356,0.0032282392,0.006318519,0.0011819161,0.0018673383,0.004646369],"category_scores_gemma":[0.011655905,0.0002562531,0.0005987358,0.0012301608,0.0035985915,0.003913132,0.0029705907,0.0018110039,0.00072545843],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026324735,0.00048409132,0.026845297,0.0012677456,0.00006686933,0.005241951,0.069655284,0.006599798,0.020079333,0.42366564,0.011675618,0.4341551],"study_design_scores_gemma":[0.00005326504,0.0011653204,0.06850455,0.0019294246,0.000098936864,0.004674684,0.09402568,0.0073944563,0.0114202015,0.08472197,0.7258112,0.00020025345],"about_ca_topic_score_codex":0.012967719,"about_ca_topic_score_gemma":0.0216762,"teacher_disagreement_score":0.012967719,"about_ca_system_score_codex":0.0060684755,"about_ca_system_score_gemma":0.007416046,"threshold_uncertainty_score":0.05357021},"labels":[],"label_agreement":null},{"id":"W3183380919","doi":"10.29173/mocs173","title":"Productivity-Based Management System for Offsite Manufacturing: Case Study of Noralta Lodge","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Duration (music); Modular design; Task (project management); Quality (philosophy); Engineering; Workforce; Project management; Control (management); Operations management; Construction management; Computer science; Civil engineering; Systems engineering","score_opus":0.017461549440775877,"score_gpt":0.2129587948924664,"score_spread":0.19549724545169053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3183380919","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9761579,0.00012978751,0.006422808,0.00029774779,0.000018084796,0.0003133174,0.00012529643,0.00022858416,0.016306577],"genre_scores_gemma":[0.9761614,0.00012247833,0.009666084,0.00005054902,0.000008072747,0.00008552723,0.00019424116,0.000040055616,0.013671709],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9990839,0.00026132283,0.000040718474,0.00014073573,0.00020768035,0.00026559122],"domain_scores_gemma":[0.9990054,0.00031065563,0.00008298125,0.00010653722,0.00017548242,0.00031891975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011258144,0.00047882274,0.00027951988,0.00066970265,0.002542083,0.0016005855,0.0018427655,0.001156267,0.003923118],"category_scores_gemma":[0.0013619686,0.00020699958,0.00031448534,0.00052652246,0.0009779386,0.0008353107,0.0014409203,0.00062320207,0.00066511414],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020481483,0.014026859,0.1653686,0.0015213413,0.00021056015,0.081410944,0.051471144,0.14221688,0.065270565,0.021110948,0.016684351,0.43865976],"study_design_scores_gemma":[0.0007176213,0.0072025657,0.21445058,0.0003939132,0.00023732375,0.0069134673,0.12337755,0.37018648,0.03978899,0.0053562555,0.23098311,0.000392118],"about_ca_topic_score_codex":0.07434038,"about_ca_topic_score_gemma":0.16016789,"teacher_disagreement_score":0.07434038,"about_ca_system_score_codex":0.0038685182,"about_ca_system_score_gemma":0.0027063529,"threshold_uncertainty_score":0.14781535},"labels":[],"label_agreement":null},{"id":"W3183467042","doi":"10.29173/mocs171","title":"Experimental Research on Joint Mechanical Behavior of Container Structures","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Analysis and Optimization","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Joint (building); Structural engineering; Modular design; Upgrade; Flexural strength; Container (type theory); Stiffness; Bearing capacity; Architecture; Engineering; Computer science; Mechanical engineering","score_opus":0.06389095149035946,"score_gpt":0.29070191847423604,"score_spread":0.2268109669838766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3183467042","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9922271,0.0001662222,0.0050634756,0.000028875118,0.000022164755,0.00001657161,0.00025859717,0.00006896158,0.0021480443],"genre_scores_gemma":[0.9960521,0.00010293816,0.0023195283,0.0000075126554,0.0000064958235,0.00002023664,0.00027108775,0.000016580454,0.0012035407],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99945,0.00006083374,0.000024267321,0.00010664768,0.00025514618,0.00010304522],"domain_scores_gemma":[0.9990559,0.00020620269,0.00015046984,0.00026594166,0.00023278328,0.00008874066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006283434,0.0005706267,0.00032920952,0.0005823883,0.0004573092,0.00024288017,0.0005702219,0.00058264396,0.0038836498],"category_scores_gemma":[0.0010872087,0.00028935558,0.0003344622,0.00071033114,0.0008471987,0.0006017812,0.0004863105,0.00051271025,0.0004038302],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034059366,0.00043658147,0.0048321984,0.0001909907,0.000025734169,0.0002052027,0.00031640643,0.022307929,0.9568494,0.0018695353,0.0005218613,0.012103589],"study_design_scores_gemma":[0.00006424381,0.0054017133,0.043668482,0.000045305864,0.000064743355,0.00042279458,0.00077322964,0.13735989,0.80583495,0.0012097989,0.0050851074,0.00006968394],"about_ca_topic_score_codex":0.0007258474,"about_ca_topic_score_gemma":0.0009931263,"teacher_disagreement_score":0.0038836498,"about_ca_system_score_codex":0.00019678722,"about_ca_system_score_gemma":0.00021503407,"threshold_uncertainty_score":0.012992144},"labels":[],"label_agreement":null},{"id":"W3183825236","doi":"10.29173/mocs174","title":"An Evaluation Method of Assessing the Low Back Muscle Fatigue in Manual Material Handling","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Musculoskeletal pain and rehabilitation","field":"Medicine","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Glenrose Rehabilitation Hospital; University of Alberta","funders":"","keywords":"Electromyography; Low back pain; Muscle fatigue; Physical medicine and rehabilitation; Trunk; Work (physics); Physical therapy; Task (project management); Kinematics; Back pain; Back injury; Back muscles; Rehabilitation; Medicine; Psychology; Engineering; Mechanical engineering","score_opus":0.03504886339616046,"score_gpt":0.35168801591839205,"score_spread":0.31663915252223157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3183825236","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46357992,0.0035780056,0.5080634,0.0002611942,0.00063531724,0.00427944,0.0021954144,0.0012697913,0.016137602],"genre_scores_gemma":[0.52805966,0.0020903226,0.45220238,0.0002453906,0.00013256173,0.004662359,0.0008779298,0.00011569828,0.011613744],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9981766,0.00037268692,0.00016673066,0.00031595834,0.0008765555,0.000091516165],"domain_scores_gemma":[0.99757427,0.00061821163,0.00022904096,0.000101941514,0.0013886328,0.00008790405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024899915,0.0008105615,0.0005272859,0.0024136018,0.0004161589,0.0005040973,0.00051911385,0.0009139808,0.0037177557],"category_scores_gemma":[0.0032316628,0.00031715058,0.00044225514,0.001204303,0.00032849563,0.0006746414,0.00059471175,0.0004555844,0.001110587],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013524264,0.0004583888,0.06385353,0.00201713,0.00022021291,0.00040528973,0.0011275798,0.0010621755,0.44793516,0.00096535543,0.0033435049,0.47725922],"study_design_scores_gemma":[0.00033951114,0.009175215,0.7172029,0.00065613154,0.0006149705,0.0053967405,0.002184594,0.045475036,0.19144711,0.0015259407,0.02548712,0.0004947085],"about_ca_topic_score_codex":0.001060261,"about_ca_topic_score_gemma":0.0023633016,"teacher_disagreement_score":0.0037177557,"about_ca_system_score_codex":0.0002334753,"about_ca_system_score_gemma":0.0004224219,"threshold_uncertainty_score":0.013168514},"labels":[],"label_agreement":null},{"id":"W3184099511","doi":"10.29173/mocs179","title":"Construction-Centric Building Information Modelling to Facilitate Building Panel Prefabrication","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Building information modeling; Engineering; Construction engineering; Architecture; Architectural engineering; Interface (matter); Construction industry; Application programming interface; Production (economics); Civil engineering; Computer science; Operations management","score_opus":0.033752157743767164,"score_gpt":0.2027848462149963,"score_spread":0.16903268847122913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184099511","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018428296,0.000105852494,0.92497534,0.00009947754,0.000034157405,0.00024621442,0.0018620057,0.040638756,0.013609824],"genre_scores_gemma":[0.33806318,0.00040108443,0.6351228,0.00009959592,0.000021324604,0.0004317833,0.009835706,0.0032220818,0.012802464],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995503,0.00006359637,0.000029172686,0.000093924114,0.00022747018,0.000035464527],"domain_scores_gemma":[0.9995284,0.00009504487,0.000047395362,0.000194399,0.000105813124,0.000028950108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051691977,0.0010097293,0.00063868996,0.001170917,0.0003521533,0.0013656197,0.0014980535,0.0005705786,0.00956828],"category_scores_gemma":[0.0012206935,0.0005967876,0.0009017212,0.00096319633,0.00025145517,0.0013047291,0.0016891662,0.0007190833,0.003766029],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066378573,0.000540626,0.0072203767,0.0010145946,0.00014034177,0.0010642345,0.0024155416,0.25619775,0.077731416,0.02395396,0.045941845,0.5831155],"study_design_scores_gemma":[0.000051692306,0.00009859918,0.004313777,0.000095304844,0.00006716227,0.0005936998,0.00027281622,0.8404715,0.046247642,0.006580934,0.1011125,0.00009437317],"about_ca_topic_score_codex":0.0030908142,"about_ca_topic_score_gemma":0.0049881404,"teacher_disagreement_score":0.00956828,"about_ca_system_score_codex":0.00053196837,"about_ca_system_score_gemma":0.0008758348,"threshold_uncertainty_score":0.032009065},"labels":[],"label_agreement":null},{"id":"W3184732091","doi":"10.29173/mocs183","title":"Modular Home off-site Construction Production Line Improvement","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Productivity; Factory (object-oriented programming); Production line; Manufacturing engineering; Production (economics); Lean construction; Upstream (networking); Resource (disambiguation); Engineering; Lean manufacturing; Systems engineering; Computer science; Construction engineering; Construction industry","score_opus":0.00998583704053503,"score_gpt":0.19080182529070538,"score_spread":0.18081598825017037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184732091","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31974244,0.00024216728,0.63107127,0.0002530834,0.000043274755,0.00040458926,0.0002710552,0.0042037843,0.043768346],"genre_scores_gemma":[0.6869902,0.00019973579,0.3026938,0.000047870526,0.000013772099,0.00012667727,0.00043597343,0.00031296944,0.009178988],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985789,0.00035195018,0.00003976415,0.00013644944,0.0007520661,0.0001407941],"domain_scores_gemma":[0.9985904,0.00032417887,0.00018583477,0.00044174958,0.00039425312,0.000063556996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015003263,0.0009155811,0.00041287902,0.0015014546,0.0004049989,0.001122005,0.00119959,0.0005224008,0.0054839747],"category_scores_gemma":[0.00220428,0.0002690445,0.0006020267,0.0010560392,0.0003561657,0.00086178584,0.0015876021,0.00041686115,0.0011979236],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025935972,0.0011221401,0.013131632,0.00040036044,0.000034567343,0.0007444775,0.0012677498,0.10746776,0.073613755,0.011252704,0.0053980737,0.7853074],"study_design_scores_gemma":[0.00021128674,0.003244894,0.076373905,0.00035433748,0.00022994267,0.0022902535,0.0030548088,0.5052337,0.23323485,0.014566965,0.16104627,0.00015885053],"about_ca_topic_score_codex":0.0016617958,"about_ca_topic_score_gemma":0.003571917,"teacher_disagreement_score":0.0054839747,"about_ca_system_score_codex":0.0008596661,"about_ca_system_score_gemma":0.0011573909,"threshold_uncertainty_score":0.018345773},"labels":[],"label_agreement":null},{"id":"W3184913985","doi":"10.29173/mocs148","title":"Facilitating Technology Transfer in Offsite Construction Between India and the UK: Drivers and Challenges","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"UK-India Education and Research Initiative","keywords":"Technology transfer; Business; Developing country; Emerging technologies; Quality (philosophy); Engineering; Engineering management; Environmental planning; Economic growth; Computer science; Economics; Geography; International trade","score_opus":0.07087947127230636,"score_gpt":0.28296257544246756,"score_spread":0.21208310417016119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184913985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9796434,0.00025982715,0.00050622836,0.0042217956,0.00002250366,0.00006046324,0.000019379306,0.000009006611,0.015257323],"genre_scores_gemma":[0.9986266,0.00024726306,0.00014001841,0.00017923852,0.000004744298,0.00001412043,0.0000077653,0.0000029149494,0.0007774103],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9895252,0.00420323,0.00039141774,0.00035330091,0.0021144159,0.0034124097],"domain_scores_gemma":[0.9847089,0.0072222035,0.002612438,0.00046576292,0.0018006818,0.0031900078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0051464154,0.00031599254,0.00027724268,0.0012614568,0.0047666277,0.0069030803,0.0012859495,0.0013909083,0.0033243026],"category_scores_gemma":[0.015345992,0.00034216832,0.00024332678,0.0018599337,0.0037083924,0.0031238354,0.006609608,0.0020561118,0.00033162683],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029481732,0.0010733784,0.3015421,0.0007186913,0.00006024505,0.0068676635,0.50310093,0.0014860475,0.0030381153,0.032739058,0.0076043555,0.14147463],"study_design_scores_gemma":[0.000010233665,0.00016426432,0.09723756,0.00025988396,0.000011812028,0.0005252515,0.8766081,0.00050809584,0.00042920175,0.0018873011,0.022316577,0.00004176496],"about_ca_topic_score_codex":0.03318744,"about_ca_topic_score_gemma":0.036653474,"teacher_disagreement_score":0.03318744,"about_ca_system_score_codex":0.0068957224,"about_ca_system_score_gemma":0.010356562,"threshold_uncertainty_score":0.06598854},"labels":[],"label_agreement":null},{"id":"W3185388864","doi":"10.29173/mocs151","title":"Development of Conceptual Modular Building Unit Design Framework for Inexperienced Designers at the Pre-Design Stage","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Process (computing); Design process; Systems engineering; Engineering design process; Unit (ring theory); Architectural engineering; Engineering; Modular construction; Conceptual design; Computer science; Building design; Construction engineering; Engineering management; Process management; Work in process; Operations management; Human–computer interaction; Mechanical engineering","score_opus":0.050631562472005835,"score_gpt":0.2567080131264988,"score_spread":0.20607645065449298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185388864","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033736785,0.00018536467,0.97915834,0.00025332166,0.000034284996,0.00045727298,0.00020212827,0.0009452984,0.015390274],"genre_scores_gemma":[0.030964172,0.00032823306,0.9625019,0.000059568254,0.000011145485,0.0007229641,0.00060497236,0.00014673277,0.0046602017],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983558,0.00045013597,0.00016693611,0.00021776248,0.000680369,0.0001288562],"domain_scores_gemma":[0.9989403,0.00024502515,0.00010090991,0.0001493236,0.0004808194,0.000083643776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033306726,0.0011161105,0.00053224247,0.0025534544,0.0012011245,0.0031588087,0.0024241253,0.0011685431,0.0059804716],"category_scores_gemma":[0.0027471518,0.00068928825,0.0013263936,0.0011442886,0.0012537218,0.0030020073,0.0019702981,0.0017301653,0.0018738429],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060947234,0.00018941991,0.002538386,0.0010428713,0.00003933811,0.00082865515,0.0075507495,0.05064708,0.011296884,0.66775954,0.012770874,0.24527517],"study_design_scores_gemma":[0.000066509245,0.0002371486,0.0019314064,0.0016717608,0.00010016684,0.0015818987,0.0042942725,0.25757238,0.012789536,0.15456182,0.5650373,0.00015592328],"about_ca_topic_score_codex":0.0077266237,"about_ca_topic_score_gemma":0.0119399,"teacher_disagreement_score":0.0077266237,"about_ca_system_score_codex":0.0017894963,"about_ca_system_score_gemma":0.004520666,"threshold_uncertainty_score":0.020006657},"labels":[],"label_agreement":null},{"id":"W3186102064","doi":"10.29173/mocs195","title":"Modelling International Project Feasibility of Sustainable Construction Management: Case Study of Tele-Communication Towers","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Relevance (law); Project management; Sustainable development; Developing country; Phase (matter); Engineering; Process management; Environmental resource management; Business; Environmental economics; Management science; Engineering management; Systems engineering; Economics; Political science; Economic growth","score_opus":0.02948412566421455,"score_gpt":0.26157346975373885,"score_spread":0.2320893440895243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186102064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89535236,0.0001664514,0.07342705,0.0006600478,0.000020593236,0.00042497015,0.00030625932,0.00008167355,0.029560613],"genre_scores_gemma":[0.9716986,0.00018597428,0.024785966,0.00001767095,0.000004361886,0.0002676735,0.000125061,0.000019742265,0.002894903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99857485,0.00094882865,0.000045089026,0.00011430649,0.00014045999,0.00017641672],"domain_scores_gemma":[0.9967899,0.002451802,0.00024535586,0.0001559764,0.00019697532,0.0001599876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024933135,0.0006658321,0.00048683953,0.0009304557,0.0010714306,0.0020773495,0.0015591126,0.0024999268,0.003498874],"category_scores_gemma":[0.0035514222,0.0005722146,0.0010261886,0.0013355719,0.001647991,0.0021797505,0.0012439092,0.0011079182,0.0002569567],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011490738,0.00030397624,0.0060367743,0.00011514257,0.000026072434,0.0008965315,0.0007143864,0.96850175,0.0007819184,0.015859034,0.00039720244,0.0062522283],"study_design_scores_gemma":[0.00006305122,0.00031195823,0.0026310512,0.00005140284,0.00003050258,0.00015259147,0.0021797498,0.98647124,0.0009054962,0.004770533,0.0023938715,0.000038559356],"about_ca_topic_score_codex":0.018051766,"about_ca_topic_score_gemma":0.023918318,"teacher_disagreement_score":0.018051766,"about_ca_system_score_codex":0.002953183,"about_ca_system_score_gemma":0.0021743453,"threshold_uncertainty_score":0.03589338},"labels":[],"label_agreement":null},{"id":"W3186389269","doi":"10.29173/mocs154","title":"Steel Beam-Column Joint with Discontinuous Vertical Reinforcing Bars","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science, ICT and Future Planning","keywords":"Structural engineering; Column (typography); Joint (building); Beam (structure); Materials science; Steel bar; Precast concrete; Composite number; Composite material; Engineering; Connection (principal bundle)","score_opus":0.012698989603824635,"score_gpt":0.18737574579920624,"score_spread":0.17467675619538162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186389269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92012316,0.00045415125,0.073895425,0.00001984455,0.00007741033,0.00010803736,0.00020044466,0.0009645767,0.0041569537],"genre_scores_gemma":[0.9610456,0.000115366696,0.033854265,0.000021270027,0.0000101236365,0.000052834544,0.00023380268,0.000051241088,0.004615526],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99966466,0.000025744706,0.00002388884,0.00009445462,0.00013269178,0.000058632777],"domain_scores_gemma":[0.9996202,0.000027941067,0.00007807122,0.00008137121,0.00014378228,0.000048590544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021677728,0.000642544,0.00030146562,0.00042408647,0.00028591865,0.00021994353,0.0008963536,0.000445612,0.002769315],"category_scores_gemma":[0.0002786923,0.00047340666,0.00033074312,0.0002684017,0.00031328175,0.00027456958,0.00058454456,0.00032626124,0.0011883876],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001913371,0.00008198857,0.004102706,0.00017903374,0.00003130133,0.00031797634,0.00008709877,0.0024001384,0.96737814,0.0005631921,0.00024225295,0.024424894],"study_design_scores_gemma":[0.00005953098,0.003245046,0.034402378,0.00004759532,0.00015678165,0.0010938356,0.00009058487,0.014964712,0.9318109,0.0002753352,0.013810555,0.0000428305],"about_ca_topic_score_codex":0.0018813744,"about_ca_topic_score_gemma":0.0065942337,"teacher_disagreement_score":0.002769315,"about_ca_system_score_codex":0.00019646288,"about_ca_system_score_gemma":0.00036085534,"threshold_uncertainty_score":0.00926429},"labels":[],"label_agreement":null},{"id":"W3186492530","doi":"10.29173/mocs166","title":"Risk Mitigation through Tolerance Strategies for Design in Modularization","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Rework; Risk analysis (engineering); Modular programming; Maintainability; Reliability engineering; Computer science; Engineering; Business; Embedded system","score_opus":0.01632201230720975,"score_gpt":0.21418602635848605,"score_spread":0.1978640140512763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186492530","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014332157,0.00019936009,0.97952855,0.00010966913,0.000013799284,0.00009013491,0.000005469464,0.00013641802,0.0055844374],"genre_scores_gemma":[0.4949102,0.0004710523,0.5012149,0.00009900014,0.000018994997,0.000304251,0.000029353245,0.00008317605,0.0028690076],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9973653,0.0010395925,0.00015434151,0.00025911408,0.0009953473,0.00018623569],"domain_scores_gemma":[0.99756324,0.00089383457,0.0005506414,0.00040942893,0.0004994651,0.000083494386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036178692,0.0015218917,0.00064204115,0.0018439377,0.00064859545,0.0016455561,0.0011872279,0.00082274457,0.002093663],"category_scores_gemma":[0.00597534,0.000467609,0.00080831884,0.00072671566,0.0017835431,0.0018691362,0.0027489003,0.0009594073,0.00027273645],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000640165,0.00015379037,0.0015986958,0.00035094126,0.00009168524,0.00013453486,0.0007824128,0.6353445,0.017326815,0.14575434,0.0005987598,0.19779949],"study_design_scores_gemma":[0.00005196457,0.0008275704,0.001136209,0.00038327256,0.0001379751,0.00036988265,0.0006241714,0.7258986,0.02374379,0.23029831,0.016452076,0.000076177756],"about_ca_topic_score_codex":0.0006544346,"about_ca_topic_score_gemma":0.0008394447,"teacher_disagreement_score":0.0036178692,"about_ca_system_score_codex":0.0009777504,"about_ca_system_score_gemma":0.0016332516,"threshold_uncertainty_score":0.01913333},"labels":[],"label_agreement":null},{"id":"W3186564867","doi":"10.29173/mocs149","title":"BIM-Integrated Simulation of Construction Operations for Lean Production Management","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation of Korea; Ministry of Science, ICT and Future Planning; National Research Foundation","keywords":"Procurement; Productivity; Schedule; Production (economics); Computer science; Plan (archaeology); Supply chain; Reliability (semiconductor); Lean manufacturing; Simulation modeling; Reliability engineering; Operations management; Engineering; Business","score_opus":0.01666541407334009,"score_gpt":0.22140367666189392,"score_spread":0.20473826258855382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186564867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10624959,0.000093840805,0.8671685,0.00021538777,0.00009858303,0.000196322,0.0013896583,0.004009925,0.020578196],"genre_scores_gemma":[0.75034493,0.00020042845,0.2430746,0.000045632834,0.000014018252,0.00040383832,0.0016792867,0.00029351114,0.0039436813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996313,0.00011690839,0.000026261365,0.00003693711,0.00014321772,0.000045423112],"domain_scores_gemma":[0.9995609,0.00017386707,0.000033193304,0.00008607347,0.00010522285,0.000040726958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008129253,0.0006517119,0.00053003925,0.00073866436,0.0005106817,0.0010779877,0.0009071706,0.0007309901,0.005154806],"category_scores_gemma":[0.0012811036,0.00046706348,0.0007761225,0.00082553126,0.00044049494,0.00083818624,0.0009648862,0.0006656227,0.0007259035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048871483,0.00007880673,0.0012869618,0.000032705608,0.000012953262,0.000045138946,0.00007614936,0.9812354,0.0015218605,0.006757003,0.0006143761,0.00828976],"study_design_scores_gemma":[0.0000066147436,0.000010332512,0.00018222426,0.0000037652455,0.000003013696,0.0000065137074,0.000014808984,0.99672,0.00076450285,0.0011126469,0.0011713202,0.000004174573],"about_ca_topic_score_codex":0.008460779,"about_ca_topic_score_gemma":0.008865483,"teacher_disagreement_score":0.008460779,"about_ca_system_score_codex":0.0008215002,"about_ca_system_score_gemma":0.0016044689,"threshold_uncertainty_score":0.017244577},"labels":[],"label_agreement":null},{"id":"W3186953845","doi":"10.29173/mocs165","title":"Cross-laminated Timber Tornado Safe Room as a Stand-alone Module","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Tree Root and Stability Studies","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"FPInnovations","funders":"Natural Resources Canada","keywords":"Tornado; Prefabrication; Engineering; Cross laminated timber; Low-rise; Demolition; Civil engineering; Environmental science; Architectural engineering; Forensic engineering; Geology","score_opus":0.012547637914838565,"score_gpt":0.2237649464460363,"score_spread":0.21121730853119774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186953845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9649133,0.00013391535,0.021046868,0.000022270578,0.000030805935,0.000068760775,0.00012511565,0.00021396879,0.013444854],"genre_scores_gemma":[0.97125536,0.00010253168,0.019578721,0.000020831887,0.000007227519,0.00002949279,0.0001749108,0.000047165584,0.008783744],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998734,0.000014787,0.000004912849,0.000022180691,0.0000636845,0.00002109009],"domain_scores_gemma":[0.9998385,0.000017569098,0.000031288844,0.000021495789,0.00005425921,0.00003689934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017800106,0.00019475278,0.00012130279,0.00042732502,0.00026232185,0.00034141395,0.00037965665,0.00019657961,0.0034521518],"category_scores_gemma":[0.00023396222,0.000115118964,0.00016042081,0.00020518289,0.00016110923,0.00024956305,0.0003207334,0.00022355531,0.00072666164],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002345819,0.00020860326,0.010201281,0.00033026768,0.000019544399,0.0011515031,0.000961467,0.00569302,0.89933324,0.0027025884,0.0012172885,0.07794667],"study_design_scores_gemma":[0.000043159213,0.0052447245,0.14455412,0.00013634055,0.00010267507,0.0066090706,0.0026177836,0.025282698,0.732646,0.0011520702,0.08152002,0.0000913183],"about_ca_topic_score_codex":0.00034938098,"about_ca_topic_score_gemma":0.0015069894,"teacher_disagreement_score":0.0034521518,"about_ca_system_score_codex":0.0001403489,"about_ca_system_score_gemma":0.00021594735,"threshold_uncertainty_score":0.011548579},"labels":[],"label_agreement":null},{"id":"W3197063582","doi":"10.29173/mocs146","title":"A Study on Freeform Optimization using BIM Technology","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Construction engineering; Visualization; Computer science; Process (computing); Quality (philosophy); Engineering; Systems engineering; Risk analysis (engineering); Mechanical engineering","score_opus":0.021864561917337523,"score_gpt":0.22342238909860235,"score_spread":0.20155782718126483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197063582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.103061736,0.002498591,0.8399414,0.00047254714,0.000120000215,0.0001360066,0.00010074778,0.00022662996,0.05344241],"genre_scores_gemma":[0.73710084,0.0047733365,0.24481456,0.00013003635,0.000075475546,0.0001396564,0.00019965327,0.00014145796,0.012625011],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989411,0.0003588674,0.000036356363,0.00010636632,0.0004878151,0.00006952986],"domain_scores_gemma":[0.9993199,0.00035901307,0.00004267535,0.000099753626,0.00015701397,0.000021734868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010370525,0.0005517435,0.0004897441,0.00086801575,0.0004588764,0.0012697127,0.00057132577,0.000677611,0.0025311739],"category_scores_gemma":[0.0017823745,0.0003716238,0.0010181556,0.0014890658,0.00050900265,0.0017793755,0.0007398764,0.0005195727,0.00032280435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000112858084,0.00030900358,0.00562176,0.0005783745,0.00006419357,0.00040935405,0.00057290506,0.49893898,0.013443914,0.108667426,0.0032288425,0.36805233],"study_design_scores_gemma":[0.000011884758,0.00018111008,0.0028090447,0.00007375872,0.00002965982,0.0002724801,0.00032747124,0.95267737,0.010961065,0.011589924,0.021027766,0.00003845898],"about_ca_topic_score_codex":0.0022143945,"about_ca_topic_score_gemma":0.0016895649,"teacher_disagreement_score":0.0025311739,"about_ca_system_score_codex":0.00049359864,"about_ca_system_score_gemma":0.0006410332,"threshold_uncertainty_score":0.008467615},"labels":[],"label_agreement":null},{"id":"W3200994258","doi":"10.29173/mocs190","title":"Toward a Simulation-based Approach for Emergency Evacuation Route Planning in Metro Stations","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Evacuation and Crowd Dynamics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Emergency evacuation; Pedestrian; Computer science; Metro station; Transport engineering; Route planning; Operations research; Emergency rescue; Selection (genetic algorithm); Simulation; Engineering","score_opus":0.04509735517089215,"score_gpt":0.27249126699535575,"score_spread":0.2273939118244636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200994258","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013173682,0.000111126596,0.98329806,0.00009848792,0.000022627262,0.00009777359,0.000049003604,0.00034620633,0.0028030188],"genre_scores_gemma":[0.44586715,0.00056235836,0.5509371,0.00005390267,0.000026511047,0.00049278664,0.00022189468,0.00009010993,0.0017481847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996024,0.00018552312,0.000026100164,0.000055103337,0.00009328039,0.00003763463],"domain_scores_gemma":[0.999572,0.00018392058,0.000051560728,0.000037988197,0.00011298732,0.00004156754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007327219,0.0008096544,0.00078661845,0.0009554106,0.00067114126,0.0011712918,0.001430754,0.0009278512,0.0015751265],"category_scores_gemma":[0.0013595452,0.0006353078,0.0010551071,0.00064561446,0.0004853994,0.0008370676,0.0010572865,0.0008610919,0.00024229081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001409299,0.000024524545,0.00043636278,0.000031897638,0.000020954243,0.000038424412,0.000042760064,0.98793423,0.0007459803,0.0042223604,0.00010777379,0.0063806595],"study_design_scores_gemma":[0.000003839079,0.000007738486,0.000041380998,0.0000058704,0.0000053342496,0.0000064408464,0.000016409364,0.99847513,0.0001878305,0.00084754825,0.00039882437,0.0000036898732],"about_ca_topic_score_codex":0.012008634,"about_ca_topic_score_gemma":0.011195184,"teacher_disagreement_score":0.012008634,"about_ca_system_score_codex":0.0008623128,"about_ca_system_score_gemma":0.0018935881,"threshold_uncertainty_score":0.023877501},"labels":[],"label_agreement":null},{"id":"W3205073250","doi":"10.29173/mocs163","title":"Design and Specification Compilation of a Modularized Prefabricated High-rise Steel Frame Structure with Inclined Braces Part I: Integral Structural Design","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China; National Science Foundation","keywords":"Structural engineering; Steel frame; Structural system; Displacement (psychology); Frame (networking); Finite element method; High rise; Engineering; Computer science; Mechanical engineering","score_opus":0.01893120030751462,"score_gpt":0.1994693870305877,"score_spread":0.1805381867230731,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205073250","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026912013,0.00011551483,0.9610213,0.00004268037,0.000038371414,0.0002675107,0.00033016788,0.0012135031,0.010059],"genre_scores_gemma":[0.30801445,0.00025511245,0.6768278,0.000053521155,0.000022664315,0.0005867164,0.0012901103,0.0003722808,0.012577392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955815,0.00005167067,0.000034621105,0.00006273127,0.00025155404,0.000041208415],"domain_scores_gemma":[0.9997739,0.000019513884,0.000030585736,0.000035928373,0.00012696674,0.000013131848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039257845,0.00059020333,0.0003277408,0.00056686974,0.00020563552,0.00044557612,0.0008361931,0.00037099936,0.0027672653],"category_scores_gemma":[0.00030898253,0.00034610974,0.0006272714,0.00023133545,0.00029249114,0.00023823873,0.00036819102,0.00031974085,0.0010038051],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012843075,0.00010045894,0.0026961453,0.0009179009,0.00005858461,0.0008521194,0.0003878515,0.42521873,0.2864374,0.0379529,0.007400794,0.23784868],"study_design_scores_gemma":[0.000108133354,0.00087420037,0.0046093557,0.000111518966,0.00011635408,0.0012759675,0.00016741059,0.69573087,0.13027187,0.005314159,0.1613392,0.00008095292],"about_ca_topic_score_codex":0.0020246857,"about_ca_topic_score_gemma":0.0020045473,"teacher_disagreement_score":0.0027672653,"about_ca_system_score_codex":0.00031629213,"about_ca_system_score_gemma":0.0009287648,"threshold_uncertainty_score":0.009257436},"labels":[],"label_agreement":null},{"id":"W3206520832","doi":"10.29173/mocs167","title":"Robotic Assembly System for Steel Structures","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Robot Manipulation and Learning","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Beam (structure); Rotation (mathematics); Process (computing); Computer science; Mechanical engineering; Position (finance); Flywheel; Engineering; Structural engineering; Simulation; Artificial intelligence","score_opus":0.023631709489649006,"score_gpt":0.2188757769199144,"score_spread":0.19524406743026537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206520832","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031550396,0.0005184393,0.91474295,0.00015859678,0.00039596087,0.0007349741,0.0005643777,0.030514728,0.02081947],"genre_scores_gemma":[0.29502666,0.00042860064,0.6555765,0.00018051843,0.00011182488,0.0011334374,0.0018348846,0.0007015362,0.045005955],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994655,0.000046432757,0.000032440337,0.000114516064,0.00028865103,0.000052492214],"domain_scores_gemma":[0.9996371,0.000030033727,0.00004443585,0.000069053305,0.00017557062,0.000043843247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048058326,0.0010425146,0.0006215427,0.0010207226,0.00079379074,0.00049150345,0.0012776746,0.000701164,0.015247606],"category_scores_gemma":[0.0005653476,0.0004329725,0.0006145032,0.00040719757,0.00032924308,0.00053413404,0.0009766151,0.00053625717,0.006517813],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043692894,0.0003171489,0.0024520988,0.00089829665,0.00007639637,0.00087925105,0.0005546401,0.030464526,0.40274405,0.0058817235,0.03487739,0.52041745],"study_design_scores_gemma":[0.00040059662,0.0028224818,0.014261673,0.00020045685,0.0001766345,0.0026784032,0.0002087035,0.39304584,0.18335973,0.0029972573,0.3994631,0.00038515765],"about_ca_topic_score_codex":0.002840433,"about_ca_topic_score_gemma":0.0023956287,"teacher_disagreement_score":0.015247606,"about_ca_system_score_codex":0.00044462507,"about_ca_system_score_gemma":0.0010570992,"threshold_uncertainty_score":0.051008344},"labels":[],"label_agreement":null},{"id":"W3206861418","doi":"10.29173/mocs182","title":"Automation of Quantity Take-off for Modular Construction","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Automation; Modular design; Computer science; Takeoff; Interface (matter); Process (computing); Purchasing; Building information modeling; Exploit; Modular programming; Industrial engineering; Software engineering; Database; Engineering drawing; Engineering; Operations management; Mechanical engineering; Operating system","score_opus":0.015974160699347744,"score_gpt":0.2132640815437478,"score_spread":0.19728992084440006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206861418","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06770469,0.00022398571,0.9004654,0.00014185651,0.0000689285,0.00042322878,0.00075326435,0.017591618,0.012627044],"genre_scores_gemma":[0.4265025,0.00032000328,0.56465614,0.000055292403,0.000041947307,0.00022146975,0.001983557,0.0014164342,0.004802724],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99809223,0.00034328335,0.00015338727,0.00029995994,0.0010036554,0.000107498025],"domain_scores_gemma":[0.99688643,0.000922389,0.00035447546,0.0010151631,0.0007456012,0.00007586775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016051029,0.00096091756,0.0007891219,0.0026841776,0.00066387194,0.001961012,0.0011363941,0.00035327827,0.0074063963],"category_scores_gemma":[0.006794567,0.0005952147,0.0005052581,0.0018614968,0.000463931,0.0015757903,0.0017500577,0.00062453694,0.0028822112],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034874454,0.0002280782,0.008096271,0.000391213,0.000031438507,0.0003451845,0.001206895,0.010889966,0.05569239,0.0069192788,0.0086439485,0.9072066],"study_design_scores_gemma":[0.00016121498,0.0008372382,0.06736894,0.00039181052,0.00015941505,0.0026707577,0.002081278,0.44401112,0.31352624,0.028348671,0.14003102,0.00041235588],"about_ca_topic_score_codex":0.0016832255,"about_ca_topic_score_gemma":0.0021498546,"teacher_disagreement_score":0.0074063963,"about_ca_system_score_codex":0.0004330127,"about_ca_system_score_gemma":0.0010792449,"threshold_uncertainty_score":0.024776816},"labels":[],"label_agreement":null},{"id":"W3208791292","doi":"10.29173/mocs186","title":"Innovative and Energy Efficient Smart Window Based on Nanomaterial Technologies","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Transition Metal Oxide Nanomaterials","field":"Materials Science","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Electrochromism; Nanomaterials; Nanocellulose; Materials science; Nanotechnology; Electric light; Smart material; Computer science; Process engineering; Engineering; Electrical engineering; Electrode","score_opus":0.011532875680277103,"score_gpt":0.20365752102161624,"score_spread":0.19212464534133913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208791292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60244095,0.07134579,0.27124467,0.0014092105,0.0011827057,0.00026738353,0.0007319084,0.0016214793,0.049755923],"genre_scores_gemma":[0.83957636,0.016350646,0.13106315,0.00038432312,0.00012043222,0.000141589,0.00024359551,0.00007901875,0.012040925],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998628,0.000010232667,0.0000070590954,0.000033125394,0.00006025353,0.000026547441],"domain_scores_gemma":[0.999941,0.0000131238385,0.000015426203,0.000007848037,0.000013176774,0.000009400533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013568462,0.0003377834,0.00026454992,0.00037429645,0.00020452836,0.00057201425,0.00051062525,0.00076891185,0.0012168498],"category_scores_gemma":[0.000118069634,0.00019242373,0.00044275395,0.00021960321,0.00021525644,0.0009971472,0.00044183692,0.00048042496,0.0005323579],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022251947,0.000026951984,0.00010823453,0.0002801095,0.000011329201,0.00014370725,0.00002747408,0.0005401536,0.98167855,0.003934899,0.00033154403,0.012894742],"study_design_scores_gemma":[0.00001006316,0.00017990399,0.00065629784,0.00003471501,0.000022131915,0.00060609705,0.000036470745,0.005911369,0.96174455,0.001158975,0.029613014,0.000026397774],"about_ca_topic_score_codex":0.00017684493,"about_ca_topic_score_gemma":0.00034046182,"teacher_disagreement_score":0.0012168498,"about_ca_system_score_codex":0.00033221638,"about_ca_system_score_gemma":0.0001824875,"threshold_uncertainty_score":0.0040708184},"labels":[],"label_agreement":null},{"id":"W3211701357","doi":"10.29173/mocs168","title":"From Digital to Physical: Advancing Industrialized Construction through Digital Prototyping Processes","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Architecture and Computational Design","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Workflow; Flexibility (engineering); Rapid prototyping; Systems engineering; Personalization; Architecture; Computer science; Engineering; Software engineering; Manufacturing engineering; Mechanical engineering; World Wide Web","score_opus":0.014357812858018236,"score_gpt":0.21908661105116128,"score_spread":0.20472879819314305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211701357","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038186155,0.0027113578,0.88668525,0.0013832744,0.00018963903,0.00010847194,0.000074403935,0.0010408574,0.06962065],"genre_scores_gemma":[0.40556133,0.0039162887,0.58384436,0.00023049476,0.00007925218,0.00012939569,0.00008522302,0.000153585,0.0060001644],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986394,0.00043307067,0.000055420674,0.0001528127,0.0006256836,0.00009346627],"domain_scores_gemma":[0.99830484,0.00075610785,0.00011648768,0.00055321626,0.00017889478,0.00009041261],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001818646,0.00059619895,0.00029748247,0.00093509984,0.0006224259,0.0030633744,0.001257216,0.00076623255,0.004143179],"category_scores_gemma":[0.0025517156,0.0004051018,0.00048738162,0.0007279551,0.0031616974,0.0033552484,0.0027466856,0.001113541,0.0008339043],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001767875,0.00014916401,0.0014416388,0.00066063524,0.000026891177,0.00045915396,0.0019456039,0.038549904,0.050721508,0.59730834,0.003090538,0.30546984],"study_design_scores_gemma":[0.00014129154,0.0009220477,0.0021228192,0.00063798856,0.000070867405,0.0015052913,0.0014711801,0.13056509,0.13097449,0.32428703,0.40711185,0.00019014305],"about_ca_topic_score_codex":0.00071612524,"about_ca_topic_score_gemma":0.0008843977,"teacher_disagreement_score":0.004143179,"about_ca_system_score_codex":0.0010783939,"about_ca_system_score_gemma":0.0010961044,"threshold_uncertainty_score":0.013860285},"labels":[],"label_agreement":null},{"id":"W3213414280","doi":"10.29173/mocs175","title":"BIM-enabled Modular and Industrialized Construction in China","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Industrialisation; China; Modular design; Productivity; Sustainable development; Business; Quality (philosophy); Resource (disambiguation); Industry of China; Engineering; Industrial organization; Economic growth; Computer science; Economics; Political science","score_opus":0.011775746094134386,"score_gpt":0.19460622450448378,"score_spread":0.18283047841034938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213414280","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8554572,0.0047104014,0.044686504,0.0014874513,0.00008578982,0.00024740273,0.0005005092,0.000700932,0.09212383],"genre_scores_gemma":[0.9759798,0.0017343562,0.014264506,0.00007447895,0.000015896565,0.000045788896,0.00036517758,0.00002558701,0.00749433],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99907804,0.00012252203,0.000064123255,0.00011026527,0.00044738766,0.0001777794],"domain_scores_gemma":[0.99965835,0.00004103731,0.00005337706,0.00009136744,0.00009789422,0.00005807446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011607966,0.00045798358,0.00027096106,0.00212043,0.0008245225,0.001226868,0.00077847386,0.00037323518,0.0025440862],"category_scores_gemma":[0.0007407128,0.00027893556,0.00047680232,0.0040733805,0.0010667879,0.0011059301,0.0023483748,0.00024207422,0.00023121241],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000347304,0.00041241135,0.068124935,0.00086599967,0.00009959751,0.0026189436,0.005151788,0.07994948,0.016406765,0.124725215,0.008515859,0.6927817],"study_design_scores_gemma":[0.00017197173,0.00069859286,0.32969564,0.00035632518,0.00023913597,0.0016278842,0.004062984,0.26890984,0.022207506,0.032509904,0.33931488,0.00020538495],"about_ca_topic_score_codex":0.039341614,"about_ca_topic_score_gemma":0.044962335,"teacher_disagreement_score":0.039341614,"about_ca_system_score_codex":0.003991857,"about_ca_system_score_gemma":0.006809047,"threshold_uncertainty_score":0.078225255},"labels":[],"label_agreement":null},{"id":"W3217612868","doi":"10.29173/mocs169","title":"Analyzing Obstacles and Exploring Opportunities to Improve Modular Industrialized Construction in Lebanon","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Modular design; Flexibility (engineering); Engineering; Prefabrication; Quality (philosophy); Construction engineering; Construction management; Integrated project delivery; Sustainability; Investment (military); Architectural engineering; Business; Civil engineering; Computer science; Management","score_opus":0.06086250026510988,"score_gpt":0.22258994585369488,"score_spread":0.16172744558858498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217612868","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9848341,0.0008691664,0.00089350546,0.0017790614,0.000016122203,0.000039308634,0.000016156157,0.000005399417,0.011547271],"genre_scores_gemma":[0.99617624,0.0006251798,0.0011128308,0.0001541997,0.0000069699563,0.000021717302,0.000020906788,0.000003766279,0.0018781277],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9974982,0.0011385056,0.00006514676,0.00013411697,0.00041443718,0.0007495586],"domain_scores_gemma":[0.9983954,0.0006735374,0.00040243022,0.00004351453,0.00026738117,0.00021772562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036687753,0.00034870798,0.00021105062,0.0013582589,0.0039348598,0.0028279824,0.00075565756,0.00070987403,0.0028507188],"category_scores_gemma":[0.002451382,0.00028416092,0.00014160242,0.0016512988,0.0019405041,0.001777393,0.0023974925,0.00072031753,0.000143757],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003160941,0.00076084916,0.2709294,0.0012339917,0.000050050738,0.011660176,0.3531128,0.003711323,0.014160993,0.08480109,0.005414243,0.253849],"study_design_scores_gemma":[0.000018045695,0.00023864167,0.19186173,0.00080276397,0.00002232066,0.0004964612,0.711349,0.002173733,0.0020356243,0.004572073,0.08638265,0.00004698461],"about_ca_topic_score_codex":0.024391327,"about_ca_topic_score_gemma":0.08324306,"teacher_disagreement_score":0.024391327,"about_ca_system_score_codex":0.0097437715,"about_ca_system_score_gemma":0.007943445,"threshold_uncertainty_score":0.070696294},"labels":[],"label_agreement":null},{"id":"W4229557843","doi":"10.29173/mocs245","title":"Estimation Formulas for Embedded-length of Connection Embedded-type Foundation Unit Modular System","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Connection (principal bundle); Embedment; Column (typography); Unit (ring theory); Structural engineering; Foundation (evidence); Engineering; Computer science; Mathematics","score_opus":0.01889241507092315,"score_gpt":0.22775456898491067,"score_spread":0.20886215391398752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229557843","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035725176,0.0002735984,0.96164167,0.000040203337,0.000029862966,0.000043884123,0.00010351045,0.00036942176,0.0017726428],"genre_scores_gemma":[0.7032516,0.0007151069,0.29071835,0.000040909345,0.000053245993,0.0002372849,0.0005896732,0.00012710785,0.00426672],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999329,0.00009238561,0.000055329834,0.00022475893,0.00024604253,0.000052637322],"domain_scores_gemma":[0.99869734,0.00043771946,0.00021542705,0.000095358715,0.00051364023,0.00004065237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007156664,0.0009588133,0.0004603693,0.0018084274,0.00041134076,0.000790784,0.001208202,0.00083664147,0.0051017157],"category_scores_gemma":[0.0041838307,0.00042217874,0.00065794203,0.00091413053,0.0005002109,0.0022639623,0.0008349093,0.0006365682,0.0011555579],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015636132,0.00007703464,0.02521433,0.000610645,0.00006969629,0.00040540533,0.0004604579,0.55231565,0.028711375,0.026007097,0.0028947075,0.3630773],"study_design_scores_gemma":[0.0000069301113,0.000056696204,0.0055309343,0.000041945972,0.000030943953,0.00019794017,0.00007973228,0.98163164,0.006222622,0.0044702752,0.0016877304,0.000042545948],"about_ca_topic_score_codex":0.0031786028,"about_ca_topic_score_gemma":0.0031339256,"teacher_disagreement_score":0.0051017157,"about_ca_system_score_codex":0.0009938901,"about_ca_system_score_gemma":0.0006229743,"threshold_uncertainty_score":0.017066896},"labels":[],"label_agreement":null},{"id":"W4230082142","doi":"10.29173/mocs191","title":"The Impact of Building Information Modelling (BIM) for Contractor Costing in Offsite Construction Projects in the UK","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Productivity; Status quo; Activity-based costing; Construction industry; Integrated project delivery; Construction management; Value (mathematics); Risk analysis (engineering); Building construction; Business; Construction engineering; Engineering management; Engineering; Operations management; Computer science; Marketing; Civil engineering; Economics","score_opus":0.019206303532829896,"score_gpt":0.2318636703462559,"score_spread":0.212657366813426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230082142","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9123141,0.001315138,0.0027350918,0.0074225226,0.000109905945,0.00017033966,0.00033507578,0.00011781677,0.07547994],"genre_scores_gemma":[0.99077046,0.0010026051,0.002285996,0.00016895669,0.000009029324,0.000030082452,0.00015150307,0.000038019803,0.0055433856],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9891889,0.004844091,0.00045238956,0.00040031475,0.003867285,0.0012470136],"domain_scores_gemma":[0.9898746,0.004231723,0.00090078346,0.0008183792,0.002936591,0.0012378807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009719393,0.00037759598,0.000330272,0.0015080143,0.0020583067,0.006084597,0.0008776828,0.0011824713,0.009826617],"category_scores_gemma":[0.021201223,0.00051220396,0.00042546986,0.0022913432,0.0016348563,0.0025875806,0.0055641965,0.0016104693,0.00076837785],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016519299,0.001384426,0.15549622,0.001233746,0.00007915452,0.003008395,0.050153967,0.024713308,0.0048331767,0.03424124,0.031290296,0.69191414],"study_design_scores_gemma":[0.00016156954,0.0020573642,0.558533,0.0021206182,0.00013483982,0.0017919979,0.11816019,0.048082072,0.0046039014,0.005545297,0.25846192,0.00034725948],"about_ca_topic_score_codex":0.23023453,"about_ca_topic_score_gemma":0.254814,"teacher_disagreement_score":0.23023453,"about_ca_system_score_codex":0.012864686,"about_ca_system_score_gemma":0.008951841,"threshold_uncertainty_score":0.45778883},"labels":[],"label_agreement":null},{"id":"W4231059634","doi":"10.29173/mocs184","title":"Experimental Studies on Seismic Performance of Precast Steel Reinforced Concrete Frame and Connections","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities; Program for New Century Excellent Talents in University; Science and Technology Commission of Shanghai Municipality","keywords":"Precast concrete; Dissipation; Ductility (Earth science); Structural engineering; Materials science; Frame (networking); Reinforced concrete; Full scale; Composite material; Computer science; Physics; Engineering; Telecommunications","score_opus":0.02062887119062931,"score_gpt":0.22836482612605774,"score_spread":0.20773595493542843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231059634","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99825865,0.000052766463,0.0011804433,0.0000064388914,0.000007776487,0.00001213904,0.00007462527,0.000022579658,0.00038457804],"genre_scores_gemma":[0.99616724,0.00014268127,0.0026175403,0.0000063641783,0.0000062239897,0.000020967998,0.00014904946,0.000008218824,0.0008817866],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996151,0.000035726523,0.000025156558,0.00007562433,0.00018664439,0.000061810904],"domain_scores_gemma":[0.99943787,0.00010780188,0.00011004692,0.00007942023,0.00018536455,0.00007940857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004162647,0.0007582602,0.00031125496,0.0005143613,0.00031260122,0.00011582078,0.00043806896,0.00052159204,0.001540994],"category_scores_gemma":[0.00064563577,0.00029383833,0.00025765735,0.00031596934,0.0004421013,0.0003751077,0.00030524415,0.00030626848,0.00020542956],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002485801,0.00015067501,0.004405745,0.000127454,0.000011994559,0.00019141576,0.00027392202,0.0034379072,0.98459715,0.00014131246,0.0000831793,0.006330694],"study_design_scores_gemma":[0.00003348975,0.0075624827,0.038747508,0.00002722526,0.00007484466,0.00029898804,0.00043138902,0.012721907,0.9382569,0.00009571437,0.0017038304,0.000045802703],"about_ca_topic_score_codex":0.0009731803,"about_ca_topic_score_gemma":0.0022454446,"teacher_disagreement_score":0.001540994,"about_ca_system_score_codex":0.00013985221,"about_ca_system_score_gemma":0.00017123569,"threshold_uncertainty_score":0.005155146},"labels":[],"label_agreement":null},{"id":"W4231092914","doi":"10.29173/mocs155","title":"An Analytical Investigation of Modular Concrete-filled Square Steel Tubes based on the Strain Compatibility","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science, ICT and Future Planning","keywords":"Compatibility (geochemistry); Structural engineering; Modular design; Composite number; Flexural strength; Materials science; Bearing capacity; Composite material; Engineering; Computer science","score_opus":0.02423873262517744,"score_gpt":0.2249609901625074,"score_spread":0.20072225753732995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231092914","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7697308,0.00026203805,0.22533786,0.000046784935,0.00002195463,0.000064999935,0.00006992801,0.0003530763,0.004112552],"genre_scores_gemma":[0.9715422,0.00013609766,0.027035844,0.000006746114,0.0000041497246,0.000020642517,0.000031818152,0.00001449763,0.0012079125],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99958223,0.00004962893,0.0000155439,0.00006689904,0.0002609318,0.000024751042],"domain_scores_gemma":[0.9995963,0.00013053688,0.00008654752,0.00003395212,0.0001396487,0.000013002479],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032224442,0.00044976798,0.00022442751,0.0007342943,0.00019266843,0.00025229953,0.00040306884,0.0003497812,0.00056043884],"category_scores_gemma":[0.0008178105,0.00027764792,0.00034944294,0.0003847855,0.0005330629,0.00033228638,0.00020968248,0.0001585662,0.00013155097],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115439776,0.000042690936,0.0050361976,0.00020571637,0.000015793943,0.0006214039,0.00027234072,0.12066621,0.8370558,0.0043261237,0.00016973291,0.03147259],"study_design_scores_gemma":[0.000007108292,0.0004153912,0.008773778,0.000022160546,0.000033201628,0.00045564317,0.000121577104,0.59323716,0.39463013,0.00060875574,0.0016505412,0.000044505276],"about_ca_topic_score_codex":0.0008300083,"about_ca_topic_score_gemma":0.0015779831,"teacher_disagreement_score":0.0008300083,"about_ca_system_score_codex":0.0003854882,"about_ca_system_score_gemma":0.0003953028,"threshold_uncertainty_score":0.002796948},"labels":[],"label_agreement":null},{"id":"W4231307182","doi":"10.29173/mocs145","title":"The Regional Industrial Symbiosis Model for Industrialized Construction Ecosystem","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Industrial Ecology","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chongqing Graduate Student Research Innovation Project; Fundamental Research Funds for the Central Universities","keywords":"Newly industrialized country; Industrial symbiosis; China; Government (linguistics); Business; Sustainable development; Productivity; Developed country; Environmental economics; Industrial organization; Environmental resource management; Developing country; Economic growth; Ecology; Economics; Political science","score_opus":0.05109248377064507,"score_gpt":0.22428898311547477,"score_spread":0.1731964993448297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231307182","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3064457,0.0014136224,0.54753274,0.0026516016,0.00014764896,0.00017023293,0.0004882963,0.00032122634,0.14082892],"genre_scores_gemma":[0.9704991,0.0005915651,0.018501312,0.00008541083,0.000018571856,0.00013504364,0.000097230164,0.000021747266,0.010049944],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996605,0.00013215642,0.000012764704,0.00007895575,0.000040346382,0.00007523391],"domain_scores_gemma":[0.99975497,0.000053485874,0.00005555215,0.000019560726,0.000049278475,0.00006725158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005960532,0.0004965424,0.0003627289,0.0007082104,0.0008302899,0.0017015411,0.0012704881,0.0010236045,0.0055894637],"category_scores_gemma":[0.0009917913,0.00020503896,0.0009781851,0.0006945553,0.0011292445,0.0023245222,0.0016204664,0.00073393364,0.00052766374],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006089437,0.00008049318,0.0063146334,0.00011102139,0.00008734236,0.00068006123,0.0009284968,0.4650441,0.0029154464,0.505429,0.0024395664,0.01590889],"study_design_scores_gemma":[0.000042483833,0.00010468233,0.0024226096,0.000037094516,0.0000672128,0.00031104416,0.0007053945,0.81744456,0.00024771184,0.1680393,0.010540446,0.00003740749],"about_ca_topic_score_codex":0.0077623907,"about_ca_topic_score_gemma":0.0059082,"teacher_disagreement_score":0.0077623907,"about_ca_system_score_codex":0.0019606282,"about_ca_system_score_gemma":0.0015039258,"threshold_uncertainty_score":0.018698573},"labels":[],"label_agreement":null},{"id":"W4232886697","doi":"10.29173/mocs156","title":"Development of Novel Connections for Pre-cast Composite and Pre-cast Concrete Frames","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Load-Bearing Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science, ICT and Future Planning","keywords":"Precast concrete; Structural engineering; Joint (building); Composite number; Finite element method; Structural system; Rack; Beam (structure); Bearing capacity; Flexural strength; Frame (networking); Engineering; Materials science; Composite material; Mechanical engineering","score_opus":0.020534016211446772,"score_gpt":0.2328786889419767,"score_spread":0.21234467273052993,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232886697","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6265936,0.0005038598,0.35852158,0.000055014738,0.00020634789,0.00021014099,0.00020057129,0.0009607977,0.012748126],"genre_scores_gemma":[0.8762625,0.00024304804,0.11562782,0.00001213657,0.000017039916,0.00008137527,0.00017351467,0.000048667916,0.0075340224],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99987364,0.000010125568,0.000004778912,0.000034278273,0.000060198126,0.000017033311],"domain_scores_gemma":[0.99987936,0.000014842812,0.000024583,0.000016257547,0.000042605803,0.000022416787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001776367,0.0005090747,0.00017534486,0.00047330762,0.0001625624,0.00021394486,0.00068281457,0.00036619502,0.002378781],"category_scores_gemma":[0.00027499057,0.00025052094,0.00019027866,0.00019023131,0.00018294257,0.00042799764,0.00025301182,0.00027341128,0.0006883594],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014300834,0.000107480955,0.0030243485,0.0003109946,0.000020337595,0.00061733986,0.00018266815,0.02161831,0.8742927,0.009247131,0.00075809326,0.089677714],"study_design_scores_gemma":[0.00005901383,0.0032341264,0.02333448,0.000097554825,0.00007669736,0.0020539071,0.00026764316,0.1318985,0.76263326,0.0018217047,0.07444132,0.00008175541],"about_ca_topic_score_codex":0.00035747397,"about_ca_topic_score_gemma":0.0016106825,"teacher_disagreement_score":0.002378781,"about_ca_system_score_codex":0.00016296591,"about_ca_system_score_gemma":0.00027681587,"threshold_uncertainty_score":0.007957876},"labels":[],"label_agreement":null},{"id":"W4232916504","doi":"10.29173/mocs159","title":"Oscillation Reduction Method for Fast Crane Operation","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Soil Mechanics and Vehicle Dynamics","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Taiwan University; National Science Council","keywords":"Oscillation (cell signaling); Acceleration; Control theory (sociology); Reduction (mathematics); Piecewise; Square root; Mathematics; Simulation; Computer science; Control (management); Physics; Mathematical analysis; Geometry; Classical mechanics","score_opus":0.014681748637616465,"score_gpt":0.23328113790624375,"score_spread":0.2185993892686273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232916504","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0133498,0.00014624363,0.98392844,0.00003813083,0.000027496582,0.000025969932,0.00001383847,0.00033397184,0.0021359974],"genre_scores_gemma":[0.6226618,0.00040505856,0.36806378,0.000072312105,0.00007932175,0.0001886438,0.00010347953,0.00021622653,0.008209265],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997969,0.0000314215,0.000009364723,0.000041953368,0.00010098971,0.000019327565],"domain_scores_gemma":[0.9997962,0.00008185795,0.000026017888,0.000023215944,0.00005870428,0.000014025229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021815822,0.00039552597,0.0003785841,0.00038743825,0.00030517924,0.00027258543,0.0005119655,0.00028979452,0.0029131684],"category_scores_gemma":[0.0006286992,0.00016626646,0.00041785656,0.00020705267,0.00028901454,0.00033663108,0.00051649153,0.00058762863,0.0006372225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031804616,0.00011012797,0.001623889,0.00031464797,0.000050582516,0.00023294233,0.00043994238,0.28882447,0.16606958,0.024776516,0.0041808835,0.51305836],"study_design_scores_gemma":[0.000022796972,0.00011575381,0.00049568,0.000011570994,0.000016561047,0.000099225574,0.00003076865,0.98375136,0.007600901,0.0033311322,0.0045050317,0.000019222385],"about_ca_topic_score_codex":0.0016872038,"about_ca_topic_score_gemma":0.0009966267,"teacher_disagreement_score":0.0029131684,"about_ca_system_score_codex":0.0001823308,"about_ca_system_score_gemma":0.00037435925,"threshold_uncertainty_score":0.009745538},"labels":[],"label_agreement":null},{"id":"W4233773337","doi":"10.29173/mocs157","title":"A Case Study on Micro Social Network Structure of Building Industrialization: Based on Structural Hole Theory","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Industrial Ecology","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Hohai University; Nanjing Agricultural University; Qufu Normal University","keywords":"Industrialisation; Constraint (computer-aided design); Social network analysis; Position (finance); Structural holes; Function (biology); Industrial organization; China; Business; Social network (sociolinguistics); Computer science; Implementation; Economics; Engineering; Social capital; Geography; Political science","score_opus":0.021836506441073995,"score_gpt":0.2391121764479349,"score_spread":0.2172756700068609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4233773337","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97537893,0.00016680884,0.010110307,0.0007137187,0.000014198952,0.00018724655,0.00022329601,0.000019455183,0.013186018],"genre_scores_gemma":[0.9930997,0.00021506952,0.0046736393,0.000033880468,0.0000071407553,0.0000737816,0.00011396718,0.0000052252044,0.0017777305],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99899477,0.0006212931,0.000025484138,0.00009006196,0.0001276933,0.00014070318],"domain_scores_gemma":[0.9982437,0.0011200676,0.0002011947,0.0001190552,0.00016824673,0.00014773948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012446014,0.00023951712,0.00017697364,0.0017557456,0.0024912946,0.0011371949,0.0007370299,0.0008327703,0.002858205],"category_scores_gemma":[0.0019938317,0.00017982676,0.00033677169,0.0023011905,0.0014829413,0.0029128112,0.0013496586,0.00057858287,0.00012969215],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032474555,0.0013257916,0.35255525,0.0008324092,0.00011840329,0.029936813,0.2520657,0.015278604,0.005126823,0.19374323,0.008754352,0.1399379],"study_design_scores_gemma":[0.00006522262,0.0005642301,0.21194245,0.00039618646,0.000118073855,0.0051316926,0.5911816,0.0982936,0.0039194548,0.033323415,0.054947086,0.0001169525],"about_ca_topic_score_codex":0.010288354,"about_ca_topic_score_gemma":0.021812338,"teacher_disagreement_score":0.010288354,"about_ca_system_score_codex":0.0020073843,"about_ca_system_score_gemma":0.0010345915,"threshold_uncertainty_score":0.02045697},"labels":[],"label_agreement":null},{"id":"W4236521613","doi":"10.29173/mocs187","title":"Older Adult-Centred Design","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Technology Use by Older Adults","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Falling (accident); Older people; Perspective (graphical); Fear of falling; Gerontology; Design elements and principles; Psychology; Human factors and ergonomics; Medicine; Computer science; Poison control; Medical emergency; Environmental health; Artificial intelligence","score_opus":0.030764201935434343,"score_gpt":0.25053741963292253,"score_spread":0.2197732176974882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236521613","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059541967,0.008483732,0.5501482,0.0055534225,0.0041031926,0.04216092,0.005582343,0.0025405749,0.32188576],"genre_scores_gemma":[0.25963926,0.0057925344,0.6044373,0.0037170227,0.0005435418,0.04856073,0.0021684621,0.00068947865,0.07445165],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9864674,0.007953716,0.0013933771,0.0011401939,0.0026362035,0.00040914066],"domain_scores_gemma":[0.98367333,0.0056722746,0.00101547,0.0027528412,0.0060069435,0.0008791647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019169206,0.00076369644,0.0007871257,0.0018291929,0.001215025,0.0033463608,0.002052528,0.0014527453,0.041471153],"category_scores_gemma":[0.03609077,0.00047667464,0.0014465917,0.0017649637,0.001413818,0.0014184957,0.0034732926,0.0011644225,0.007545895],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017928861,0.00090069784,0.0073100375,0.012485439,0.00023995039,0.00061896147,0.025155863,0.0031423925,0.0071676886,0.08429777,0.08127984,0.77560836],"study_design_scores_gemma":[0.00080927083,0.0020926788,0.008425685,0.0034201064,0.00024472564,0.0007287774,0.0044613956,0.0016610014,0.0023696835,0.024725588,0.9509588,0.000102315265],"about_ca_topic_score_codex":0.0012484274,"about_ca_topic_score_gemma":0.0022416166,"teacher_disagreement_score":0.041471153,"about_ca_system_score_codex":0.0017972112,"about_ca_system_score_gemma":0.0049649132,"threshold_uncertainty_score":0.13873482},"labels":[],"label_agreement":null},{"id":"W4236550846","doi":"10.29173/mocs164","title":"Design and Specification Compilation of a Modularized Prefabricated High-rise Steel Frame Structure with Inclined Braces Part II: Elastic-plastic analysis and Joint Design","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China; National Science Foundation","keywords":"Structural engineering; Flange; Joint (building); Brace; Finite element method; Column (typography); Steel frame; High rise; Engineering; Beam (structure); Shear force; Connection (principal bundle)","score_opus":0.017337907783839594,"score_gpt":0.1893948225986353,"score_spread":0.1720569148147957,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236550846","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02424684,0.00016789115,0.9611654,0.00005191208,0.000055096203,0.00036834108,0.00043973196,0.0012746596,0.012230017],"genre_scores_gemma":[0.3197785,0.00035376908,0.6599807,0.00006855582,0.000036024336,0.00083717925,0.001559569,0.0004119057,0.016973779],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996124,0.000042459982,0.0000293045,0.000059892565,0.00022152528,0.000034439225],"domain_scores_gemma":[0.9997652,0.00002117531,0.000033915752,0.00002811036,0.00013936762,0.0000121936355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035233382,0.0007522388,0.00038372428,0.00065412436,0.00023784202,0.00044479762,0.0008393287,0.0004308564,0.0037750495],"category_scores_gemma":[0.0002873435,0.00039827402,0.00065289554,0.00026928345,0.00025609872,0.00021975885,0.00028541096,0.00030721835,0.0013374081],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014846718,0.0000962422,0.0020706234,0.0012467923,0.000065413085,0.0008460583,0.0003234129,0.44043112,0.29644525,0.022755483,0.008610619,0.2269606],"study_design_scores_gemma":[0.00015143007,0.0011501546,0.005027858,0.0001156987,0.0001454988,0.0011821565,0.00014929919,0.7257565,0.11324057,0.004348618,0.14863458,0.00009765374],"about_ca_topic_score_codex":0.0020973065,"about_ca_topic_score_gemma":0.0021599403,"teacher_disagreement_score":0.0037750495,"about_ca_system_score_codex":0.00034435285,"about_ca_system_score_gemma":0.0009138815,"threshold_uncertainty_score":0.012628853},"labels":[],"label_agreement":null},{"id":"W4242565646","doi":"10.29173/mocs147","title":"An Application of Fuzzy Ergonomic Assessment for Human Motion Analysis in Modular Construction","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Engineering; Modular design; Computer science; Artificial intelligence","score_opus":0.04808104717771108,"score_gpt":0.4196320496397879,"score_spread":0.37155100246207684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242565646","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26922742,0.0004180303,0.7271751,0.000104296996,0.00004844861,0.00015118846,0.00015285249,0.00052903534,0.002193693],"genre_scores_gemma":[0.88714737,0.0001665212,0.111931495,0.000018926174,0.000010044572,0.00005005164,0.000081797465,0.000010044352,0.00058376975],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999678,0.00006434989,0.00002460394,0.00007948281,0.00012528716,0.000028318424],"domain_scores_gemma":[0.99959594,0.00018195114,0.000047824196,0.000023368279,0.00012744633,0.000023439568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068388646,0.00051128276,0.0004153973,0.0011581976,0.00037815218,0.00055593334,0.0003376107,0.000535657,0.0008788698],"category_scores_gemma":[0.0014903388,0.0001749976,0.0006056816,0.00052476616,0.00021760106,0.00030620018,0.0004188045,0.00022427563,0.00015420273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071062474,0.00025278525,0.01155349,0.00040746847,0.00013124968,0.0007026375,0.000916596,0.36010003,0.12035402,0.0020299784,0.00080365455,0.5020375],"study_design_scores_gemma":[0.000012804966,0.00025075054,0.009025143,0.000030733925,0.000037034486,0.00014622469,0.0001408402,0.97916496,0.0095826145,0.00085975125,0.0007120967,0.000037021386],"about_ca_topic_score_codex":0.006024672,"about_ca_topic_score_gemma":0.0039941217,"teacher_disagreement_score":0.006024672,"about_ca_system_score_codex":0.00030823462,"about_ca_system_score_gemma":0.00041693982,"threshold_uncertainty_score":0.011979163},"labels":[],"label_agreement":null},{"id":"W4243046299","doi":"10.29173/mocs194","title":"Assessment of User Comfort Aspects of Industrialized Building Systems using PROMETHEE and Delphi","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Building Design and Assessment","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Pairwise comparison; Delphi; Process (computing); Point (geometry); Computer science; Analytic hierarchy process; Rank (graph theory); Delphi method; Architectural engineering; Quality (philosophy); Risk analysis (engineering); Construction engineering; Systems engineering; Engineering; Operations research; Artificial intelligence; Mathematics","score_opus":0.028969184804208657,"score_gpt":0.266226443420257,"score_spread":0.23725725861604832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243046299","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8677893,0.00047466083,0.10193665,0.0007695617,0.000039743318,0.0037720772,0.00010653882,0.000073980285,0.025037417],"genre_scores_gemma":[0.91208667,0.00043960914,0.08233692,0.00015992783,0.000015769641,0.0023692267,0.00007530266,0.000016074584,0.0025005797],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.930837,0.05689835,0.0024779208,0.0012540797,0.0065230285,0.0020095448],"domain_scores_gemma":[0.9725044,0.021103945,0.0011972111,0.0010381873,0.0036841058,0.00047217976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.043560136,0.0010421412,0.00056134927,0.0034358255,0.0031748218,0.002915538,0.0011731376,0.0009513044,0.0028082535],"category_scores_gemma":[0.032579627,0.0006860064,0.0006813837,0.002026332,0.0023585528,0.0024292888,0.0050654984,0.00094650744,0.00031145205],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013912941,0.0012744537,0.04194727,0.0038290462,0.00022101786,0.0012983432,0.48668918,0.016281122,0.03512651,0.038274772,0.0025046053,0.37116227],"study_design_scores_gemma":[0.00024068367,0.009268808,0.104081154,0.0025161556,0.0002182521,0.0027388094,0.6646165,0.05703792,0.0408147,0.045299083,0.07236642,0.0008014235],"about_ca_topic_score_codex":0.0014091027,"about_ca_topic_score_gemma":0.0024702074,"teacher_disagreement_score":0.043560136,"about_ca_system_score_codex":0.002953339,"about_ca_system_score_gemma":0.0036405534,"threshold_uncertainty_score":0.23037076},"labels":[],"label_agreement":null},{"id":"W4248061455","doi":"10.29173/mocs160","title":"Automatic Estimation System of Building Frames Integrated with Structural Design Information (AutoES)","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Korea Agency for Infrastructure Technology Advancement; Ministry of Land, Infrastructure and Transport","keywords":"Schedule; Cost estimate; Estimation; Task (project management); Computer science; Industrial engineering; Software; Mistake; Unavailability; Engineering drawing; Reliability engineering; Engineering; Systems engineering","score_opus":0.007573862904187757,"score_gpt":0.18564841675592483,"score_spread":0.17807455385173707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248061455","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022567,0.00022074349,0.9398937,0.000067294524,0.00007324381,0.0002136086,0.0014444828,0.030818028,0.0047018575],"genre_scores_gemma":[0.3386492,0.00037899215,0.63972753,0.00010461978,0.000101394115,0.0006496997,0.0066716745,0.0010207194,0.01269611],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983132,0.0001839614,0.00011627688,0.0005576342,0.00073437195,0.00009457075],"domain_scores_gemma":[0.9985856,0.00019004205,0.00017052538,0.00023699252,0.00075418816,0.00006271758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00097075175,0.0014361126,0.0009491235,0.003680584,0.00047609,0.00095143047,0.0012767994,0.00055563165,0.009714254],"category_scores_gemma":[0.0024268713,0.00067628996,0.00059374946,0.001416875,0.00022518971,0.0014530413,0.0011805405,0.0004859144,0.0035974786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000479665,0.00017768207,0.010628597,0.0004093332,0.00008964091,0.00022744075,0.0003816741,0.021224905,0.04524468,0.0040484495,0.021223953,0.895864],"study_design_scores_gemma":[0.00021891267,0.00042453528,0.026531445,0.00015537304,0.00020609709,0.0006949528,0.0004737508,0.77884865,0.09643577,0.0055772634,0.09025791,0.00017528253],"about_ca_topic_score_codex":0.0036516523,"about_ca_topic_score_gemma":0.004078661,"teacher_disagreement_score":0.009714254,"about_ca_system_score_codex":0.0005659075,"about_ca_system_score_gemma":0.0008219594,"threshold_uncertainty_score":0.032497406},"labels":[],"label_agreement":null},{"id":"W4248109766","doi":"10.29173/mocs5","title":"Evolution Mechanism of Off-site Construction Ecosystem Based on the LotkaäóñVolterra Model: A Case Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Sustainable Supply Chain Management","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mechanism (biology); Beijing; Government (linguistics); Stakeholder; Management science; Industrial organization; Business; Environmental resource management; Computer science; Environmental economics; Ecology; Process management; Engineering; Economics; China; Political science; Management","score_opus":0.010764585793149975,"score_gpt":0.19240560264202602,"score_spread":0.18164101684887604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248109766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7628984,0.0006278276,0.09120891,0.0020936332,0.000055889293,0.00024806222,0.00023676289,0.0001455701,0.14248489],"genre_scores_gemma":[0.98639905,0.00025057758,0.0068150633,0.000036735157,0.0000063632024,0.00010097829,0.00005426816,0.000014775826,0.006322098],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996413,0.00014210041,0.000016598517,0.00006103974,0.00004613567,0.0000929082],"domain_scores_gemma":[0.999551,0.00016484459,0.00007798063,0.000036857014,0.00006734554,0.00010206143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052224624,0.00039853758,0.0003487068,0.0012420753,0.0018120498,0.002961177,0.0013234352,0.001932832,0.004597057],"category_scores_gemma":[0.0010477214,0.0002639634,0.0009925375,0.0010301989,0.0019656285,0.0033036454,0.0021125516,0.0007592899,0.0003534784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001539652,0.0002679104,0.030213905,0.00017796482,0.000072583534,0.0074641854,0.0062024165,0.23487069,0.004374153,0.6967795,0.0022586086,0.017164163],"study_design_scores_gemma":[0.00007140834,0.0001808004,0.0076108566,0.00012567072,0.00010687855,0.0019164296,0.0069051664,0.8084485,0.0009824316,0.15040234,0.023141813,0.00010775935],"about_ca_topic_score_codex":0.013343769,"about_ca_topic_score_gemma":0.011859416,"teacher_disagreement_score":0.013343769,"about_ca_system_score_codex":0.002961992,"about_ca_system_score_gemma":0.0015099555,"threshold_uncertainty_score":0.026532233},"labels":[],"label_agreement":null},{"id":"W4249332822","doi":"10.29173/mocs185","title":"Experimental and Numerical Study of Seismic Performance of Precast Prestressed Concrete Frame Internal Connection","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Structural engineering; Connection (principal bundle); Frame (networking); Prestressed concrete; Hysteresis; Flexural strength; Beam (structure); Finite element method; Geotechnical engineering; Failure mode and effects analysis; Materials science; Engineering; Mechanical engineering","score_opus":0.012500191534880455,"score_gpt":0.21760557243204232,"score_spread":0.20510538089716185,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249332822","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988506,0.000011119728,0.0005610847,0.000004065858,0.0000032824803,0.0000069834373,0.00005935209,0.000022304375,0.00048122968],"genre_scores_gemma":[0.9988387,0.000018926345,0.0007445055,0.0000018024483,0.0000015906097,0.0000075881135,0.000061019524,0.000003661032,0.000322208],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996941,0.000024754308,0.00001517785,0.000067262365,0.00012910488,0.00006972682],"domain_scores_gemma":[0.9995413,0.00009005075,0.00007566838,0.00008636689,0.0001224578,0.000084188745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003625709,0.00045725686,0.00040671322,0.00048310682,0.00036185095,0.0001906624,0.0005507806,0.00052859803,0.0018139378],"category_scores_gemma":[0.00055371464,0.00021677089,0.00025530029,0.00038902025,0.0005957593,0.00026149032,0.00038376177,0.00034694833,0.00017048627],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007347314,0.0006091715,0.017854648,0.00015777111,0.000026554118,0.00051167764,0.0004981806,0.07509832,0.8933201,0.0004342955,0.00022847472,0.010526142],"study_design_scores_gemma":[0.00010632684,0.008603649,0.10566547,0.000036693218,0.00011069831,0.00032161616,0.00070750125,0.27513796,0.607477,0.00024341869,0.0015095318,0.000080113256],"about_ca_topic_score_codex":0.0018922004,"about_ca_topic_score_gemma":0.00266878,"teacher_disagreement_score":0.0018922004,"about_ca_system_score_codex":0.00022436715,"about_ca_system_score_gemma":0.00026178666,"threshold_uncertainty_score":0.0060682893},"labels":[],"label_agreement":null},{"id":"W4249847880","doi":"10.29173/mocs180","title":"Evaluation of the Impact of Dynamic Work Stations Versus Static Work Stations in Wood Framing Prefabrication using Hybrid Simulation","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Modular design; Prefabrication; Production line; Work (physics); Workflow; Discrete event simulation; Factory (object-oriented programming); Production (economics); Work in process; Industrial engineering; Lead time; Work order; Manufacturing; Computer science; Manufacturing engineering; Engineering; Reliability engineering; Operations management; Simulation; Civil engineering; Mechanical engineering","score_opus":0.03782742012952542,"score_gpt":0.29143013190288475,"score_spread":0.25360271177335936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249847880","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96311516,0.00031017527,0.028197182,0.00010825908,0.000037072157,0.00010543314,0.00018429739,0.00021805457,0.007724351],"genre_scores_gemma":[0.99488443,0.00009001987,0.004375625,0.00000885518,0.0000021369615,0.00003713036,0.00006126686,0.000009725966,0.0005307626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995202,0.00017619685,0.00002398976,0.00005955409,0.00010749557,0.00011261593],"domain_scores_gemma":[0.9980811,0.0013614348,0.00015032948,0.00009535788,0.00021081931,0.00010105559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010319316,0.0008746714,0.0007545875,0.00077017717,0.00048133187,0.0011985725,0.00086078746,0.0010350103,0.0017188314],"category_scores_gemma":[0.0019019564,0.00039051208,0.00081329566,0.0006493314,0.0004219034,0.0006288059,0.0006905549,0.00058210554,0.0001505298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021076521,0.00011449176,0.0021008183,0.000054840573,0.0000178604,0.00003746621,0.000033962522,0.9906218,0.001841458,0.00031587057,0.00006110998,0.004589541],"study_design_scores_gemma":[0.000021347138,0.00037744423,0.0009718228,0.000009290029,0.000023146962,0.0000078680605,0.00007337389,0.99633706,0.0018320074,0.00012611705,0.00021140704,0.000009145373],"about_ca_topic_score_codex":0.014513124,"about_ca_topic_score_gemma":0.008906125,"teacher_disagreement_score":0.014513124,"about_ca_system_score_codex":0.0010391487,"about_ca_system_score_gemma":0.00080198044,"threshold_uncertainty_score":0.02885729},"labels":[],"label_agreement":null},{"id":"W4254407949","doi":"10.29173/mocs189","title":"A National Multilevel Analytical Research Agenda to support Integrated Construction Supply Chains for Offsite Housing Systems","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"RMIT University","keywords":"Supply chain; Panacea (medicine); SAFER; Built environment; Business; Research program; Engineering; Engineering management; Marketing; Civil engineering; Computer science","score_opus":0.3124211905745741,"score_gpt":0.4312466023855266,"score_spread":0.11882541181095246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254407949","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12531103,0.010577304,0.14737217,0.3320871,0.001886132,0.0030951435,0.0010202033,0.00062074716,0.37803012],"genre_scores_gemma":[0.65358317,0.012678408,0.26505184,0.01532743,0.00032697673,0.0020683408,0.0016617231,0.00021796243,0.049084134],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9905591,0.00463895,0.00040340231,0.0007311307,0.001755955,0.0019115706],"domain_scores_gemma":[0.98043936,0.004558853,0.0011494135,0.0018147919,0.008160763,0.0038769078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01843548,0.00051312556,0.0006406777,0.0023629025,0.00639865,0.017054083,0.0029932316,0.0041251495,0.014738477],"category_scores_gemma":[0.016167756,0.0005671589,0.0013458661,0.0034632275,0.0039041818,0.015905533,0.014262352,0.005337886,0.0021378847],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007417,0.0006769843,0.015094677,0.0032999103,0.000121701145,0.0009106936,0.026793228,0.0075442293,0.003492126,0.6837516,0.05581541,0.20242533],"study_design_scores_gemma":[0.000025261861,0.00027454057,0.015449272,0.006299583,0.00010632041,0.0002724267,0.08735106,0.0153785,0.00174743,0.27060303,0.6024195,0.00007305295],"about_ca_topic_score_codex":0.036153127,"about_ca_topic_score_gemma":0.091828875,"teacher_disagreement_score":0.036153127,"about_ca_system_score_codex":0.02048999,"about_ca_system_score_gemma":0.10445683,"threshold_uncertainty_score":0.14866596},"labels":[],"label_agreement":null},{"id":"W4296077643","doi":"10.29173/mocs286","title":"Operations management concepts applied to offsite construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Construction management; Construction engineering; Construction industry; Production (economics); Risk analysis (engineering); Architecture; Engineering; Engineering management; Systems engineering; Computer science; Business; Civil engineering","score_opus":0.0052091785366271265,"score_gpt":0.1940127567568409,"score_spread":0.18880357822021376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077643","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04110535,0.007557453,0.65736836,0.006156175,0.001068383,0.00045409132,0.0001072208,0.00016661413,0.28601635],"genre_scores_gemma":[0.6589696,0.009943976,0.2961486,0.0014300586,0.0007861979,0.00077250163,0.00015580212,0.00008343774,0.03170998],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99712616,0.001504183,0.0002255186,0.00023411543,0.0007080767,0.00020194468],"domain_scores_gemma":[0.9977216,0.0011882561,0.00043969083,0.00018112047,0.00034893013,0.00012033623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00287196,0.001194015,0.00042565344,0.0042995717,0.0016317602,0.0053143017,0.001164915,0.0014929425,0.0047606095],"category_scores_gemma":[0.0033438604,0.00031407125,0.00073977985,0.004480798,0.006711164,0.0038864329,0.003308186,0.0024867533,0.00046778374],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012159236,0.000041071646,0.0005208226,0.00016121165,0.000008444865,0.00021278538,0.0020784086,0.0039852257,0.00057907624,0.9451017,0.000862374,0.04643673],"study_design_scores_gemma":[0.000015729083,0.00016755957,0.0025957867,0.0007388589,0.000021760541,0.000590095,0.007109994,0.022436973,0.0012476416,0.79377997,0.17123994,0.00005570321],"about_ca_topic_score_codex":0.0038329803,"about_ca_topic_score_gemma":0.0032856443,"teacher_disagreement_score":0.0053143017,"about_ca_system_score_codex":0.0037829357,"about_ca_system_score_gemma":0.0038874685,"threshold_uncertainty_score":0.027447283},"labels":[],"label_agreement":null},{"id":"W4296077768","doi":"10.29173/mocs262","title":"Novel panel system for concrete masonry walls","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Masonry and Concrete Structural Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Masonry; Precast concrete; Serviceability (structure); Structural engineering; Grout; Stiffness; Cracking; Engineering; Reinforcement; Unreinforced masonry building; Geotechnical engineering; Civil engineering; Materials science","score_opus":0.011986426241396278,"score_gpt":0.18436302455176337,"score_spread":0.17237659831036709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077768","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3565878,0.0010799145,0.6039239,0.00021454925,0.0007625504,0.00035702958,0.0004894548,0.004574875,0.032009937],"genre_scores_gemma":[0.7751841,0.00038814833,0.20185752,0.000100440506,0.00007147025,0.0001523787,0.0003772413,0.00012698698,0.021741837],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997899,0.00002158721,0.000010208975,0.000045968114,0.00009822245,0.0000341636],"domain_scores_gemma":[0.99978083,0.00002495857,0.00003416039,0.00005616943,0.00006268142,0.000041116105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001785639,0.00036510482,0.00026471593,0.00030300286,0.00023227942,0.0003830759,0.0008568734,0.00058707304,0.0071249697],"category_scores_gemma":[0.00026536282,0.00023976574,0.00031989635,0.00019211847,0.00019084901,0.0004915115,0.0005580463,0.00035917654,0.0030097007],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015752604,0.000100267236,0.0012006456,0.00036613503,0.000021742084,0.00071506045,0.0001564851,0.010821011,0.88981265,0.004465068,0.00394051,0.08824292],"study_design_scores_gemma":[0.000095745454,0.0020563323,0.010121305,0.000167291,0.000081891056,0.0027767096,0.00022996942,0.19167657,0.67577505,0.0014189138,0.115409456,0.00019070372],"about_ca_topic_score_codex":0.0002585102,"about_ca_topic_score_gemma":0.00055405434,"teacher_disagreement_score":0.0071249697,"about_ca_system_score_codex":0.000119867684,"about_ca_system_score_gemma":0.00017973797,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4296077796","doi":"10.29173/mocs285","title":"VDC management in the industrialization process using prefabricated reinforcement cages. Case Study: Ovalo Monitor Bridge","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Constructability; Industrialisation; Bridge (graph theory); Prefabrication; Engineering; Construction engineering; Process (computing); Civil engineering; Structural engineering; Computer science","score_opus":0.026368304651567462,"score_gpt":0.24863909518441432,"score_spread":0.22227079053284687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94937307,0.000085143445,0.037178483,0.00016225189,0.0000057073676,0.00031898616,0.000051643787,0.00038755787,0.012437314],"genre_scores_gemma":[0.9684796,0.00005373431,0.028948886,0.000012869376,0.0000019990398,0.00008870932,0.00007151915,0.000026670674,0.0023160714],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99893314,0.00048913655,0.00003502333,0.00012645942,0.00020154631,0.00021471483],"domain_scores_gemma":[0.9989831,0.00031624924,0.00014523641,0.00020254914,0.00016590727,0.00018692545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015603014,0.00035727926,0.00013044065,0.00075717416,0.0008951277,0.00088253914,0.0007317948,0.0006956702,0.0020395517],"category_scores_gemma":[0.0017129871,0.00020929657,0.00028858363,0.0006932308,0.00075376505,0.0008344142,0.001597326,0.00035364754,0.00026734793],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000867834,0.0031323114,0.13126183,0.00054895034,0.00007945414,0.010312817,0.016825408,0.1799131,0.114295214,0.02369888,0.00290145,0.5161628],"study_design_scores_gemma":[0.00035032455,0.005661422,0.17746153,0.00027430733,0.00020010569,0.0045408644,0.027461767,0.58081454,0.09351035,0.007597756,0.10192861,0.00019846688],"about_ca_topic_score_codex":0.0083641,"about_ca_topic_score_gemma":0.013380902,"teacher_disagreement_score":0.0083641,"about_ca_system_score_codex":0.0015093266,"about_ca_system_score_gemma":0.0021426426,"threshold_uncertainty_score":0.016630828},"labels":[],"label_agreement":null},{"id":"W4296077905","doi":"10.29173/mocs270","title":"Automated BIM-based CNC file generator for wood panel framing machines in construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Framing (construction); Software; Automation; Numerical control; Computer science; Building information modeling; Information model; Software engineering; Manufacturing engineering; Engineering drawing; Engineering; Mechanical engineering; Operating system","score_opus":0.009069530823881115,"score_gpt":0.19347044105629005,"score_spread":0.18440091023240893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077905","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008006817,0.00009407131,0.97204393,0.00008623097,0.000071243994,0.00036472504,0.00055024406,0.013048471,0.005734208],"genre_scores_gemma":[0.1345284,0.00015586008,0.8571525,0.000059656257,0.00002579742,0.0005694278,0.0016802319,0.0011960753,0.004632076],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985719,0.0001857011,0.00008007497,0.00022625085,0.0008455155,0.000090528694],"domain_scores_gemma":[0.9987796,0.00034932827,0.000097480006,0.00027734693,0.00045026178,0.00004587544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012382227,0.0009457235,0.000697923,0.0020658083,0.0005827922,0.0012809194,0.0022675034,0.00084928534,0.013082674],"category_scores_gemma":[0.0030342324,0.0006190375,0.00072312437,0.0011126922,0.0005375809,0.0011259527,0.0013052454,0.000720961,0.0041496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050196814,0.00021813539,0.0032040887,0.0006615612,0.000043856886,0.00078266644,0.0006658745,0.1322603,0.050148454,0.023516765,0.028727647,0.75926864],"study_design_scores_gemma":[0.000081899976,0.00015551463,0.0023929777,0.00010735193,0.000028700946,0.0006729445,0.00016739877,0.85757154,0.07456003,0.0053974995,0.05875904,0.000105047984],"about_ca_topic_score_codex":0.0022231108,"about_ca_topic_score_gemma":0.0023999515,"teacher_disagreement_score":0.013082674,"about_ca_system_score_codex":0.0006904454,"about_ca_system_score_gemma":0.0012540395,"threshold_uncertainty_score":0.043765962},"labels":[],"label_agreement":null},{"id":"W4296077909","doi":"10.29173/mocs288","title":"Front matter, 2022 Proceedings of the Modular and Offsite Construction Summit","year":2022,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Summit; Modular design; Front (military); Modular construction; Engineering; Library science; Computer science; Geography; Mechanical engineering; Physical geography; Operating system","score_opus":0.004970221250371859,"score_gpt":0.179135614013074,"score_spread":0.17416539276270215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077909","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00089629926,0.0017544461,0.0005095577,0.007072384,0.013847722,0.000060196548,0.0021056423,0.00027949407,0.97347414],"genre_scores_gemma":[0.0020207195,0.000770434,0.0001948304,0.00046686066,0.00073919597,0.000017883409,0.000994852,0.00012566368,0.9946696],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990891,0.000051101128,0.00002731857,0.000077743476,0.00062958774,0.00012521181],"domain_scores_gemma":[0.99873275,0.000101107405,0.000024064153,0.00006696725,0.00056508067,0.0005100942],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011162232,0.0008430816,0.00042456802,0.0013116584,0.0020956048,0.005602224,0.00074985897,0.0018011729,0.5999786],"category_scores_gemma":[0.0020370956,0.00021041006,0.00031003891,0.001297678,0.0007982532,0.0015433186,0.0023111987,0.0015041356,0.3550577],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001569069,0.000010861836,0.000098022116,0.00003619269,7.882317e-7,0.000023605699,0.00003416784,0.00003109522,0.00010932749,0.0008899857,0.975927,0.022823159],"study_design_scores_gemma":[0.0000020010784,0.0000035748412,0.00039090405,0.000034524313,6.9841997e-7,0.000013246878,0.00009046661,0.000022420281,0.00005886095,0.00026543858,0.9991154,0.0000023826956],"about_ca_topic_score_codex":0.032493524,"about_ca_topic_score_gemma":0.13504796,"teacher_disagreement_score":0.5999786,"about_ca_system_score_codex":0.0030136898,"about_ca_system_score_gemma":0.004163416,"threshold_uncertainty_score":0.5705819},"labels":[],"label_agreement":null},{"id":"W4296078138","doi":"10.29173/mocs279","title":"Decision factors for the feasibility study of developing a prefabrication plant","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Flexibility (engineering); Incentive; Government (linguistics); Process (computing); Business; Operations management; Engineering; Risk analysis (engineering); Process management; Environmental economics; Computer science; Civil engineering; Economics; Management","score_opus":0.04535146010097307,"score_gpt":0.25659481132683,"score_spread":0.2112433512258569,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078138","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7995916,0.0018887471,0.10069769,0.011454755,0.00022226745,0.02585661,0.0005615842,0.00010208415,0.059624676],"genre_scores_gemma":[0.8574604,0.0009938596,0.13106027,0.00052288105,0.00004819793,0.0075833686,0.0002139528,0.000018406168,0.0020985932],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9687261,0.023131412,0.0018026172,0.0007478951,0.0042602834,0.0013316534],"domain_scores_gemma":[0.86753875,0.10657239,0.006267999,0.0019378588,0.014755443,0.0029274921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.054329958,0.0006498769,0.0005522023,0.0030687426,0.0033495862,0.0036047609,0.0009792807,0.0019218122,0.008416869],"category_scores_gemma":[0.07501902,0.00054075767,0.00086117757,0.0021218886,0.001963195,0.0041981735,0.0020355212,0.0020324346,0.00075240014],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0031105378,0.0062038144,0.08860386,0.012990763,0.00029487457,0.009628469,0.09323683,0.02036052,0.04328279,0.10756828,0.014839067,0.5998802],"study_design_scores_gemma":[0.0013289219,0.014527652,0.15426348,0.01149489,0.00083846424,0.003256416,0.47421402,0.041875087,0.0373472,0.06154326,0.19828948,0.0010211443],"about_ca_topic_score_codex":0.00211565,"about_ca_topic_score_gemma":0.00479916,"teacher_disagreement_score":0.054329958,"about_ca_system_score_codex":0.0036618432,"about_ca_system_score_gemma":0.013544153,"threshold_uncertainty_score":0.2873277},"labels":[],"label_agreement":null},{"id":"W4296078332","doi":"10.29173/mocs263","title":"Iot-based architecture to improve workflow in bricks manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Automation; Internet of Things; Architecture; Computer science; Quality (philosophy); Production (economics); Manufacturing engineering; Process (computing); Business; Process management; Database; World Wide Web; Engineering; Operating system","score_opus":0.0037848789348729115,"score_gpt":0.17216495140487134,"score_spread":0.16838007246999842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050623305,0.00042767174,0.92105603,0.0008238417,0.00015596474,0.00029727735,0.000114152484,0.0043807956,0.022121],"genre_scores_gemma":[0.5218818,0.0011824919,0.46244568,0.00030415278,0.000054331478,0.00028879856,0.0006532352,0.00038388392,0.012805567],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922395,0.00021142233,0.000081378676,0.00012809967,0.00023796524,0.00011717613],"domain_scores_gemma":[0.9995778,0.00007508398,0.00004589319,0.00011668116,0.000102249076,0.00008234504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012533242,0.0004433839,0.0002770387,0.00089621486,0.00078417256,0.0020036937,0.0010592731,0.00093779387,0.0021570718],"category_scores_gemma":[0.000971615,0.00030140384,0.0006896927,0.0007708766,0.00073439686,0.0019474641,0.0025171405,0.00084303226,0.0009651759],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071295653,0.0009105713,0.0071159154,0.0008108639,0.0001618754,0.00220797,0.005557107,0.2142861,0.12926932,0.21796834,0.013391744,0.40760714],"study_design_scores_gemma":[0.000097053395,0.0003551041,0.0065194373,0.00039710684,0.0001548581,0.0008253969,0.0013831025,0.64767283,0.047247507,0.095184885,0.20004527,0.00011739553],"about_ca_topic_score_codex":0.0026304917,"about_ca_topic_score_gemma":0.0029399698,"teacher_disagreement_score":0.0026304917,"about_ca_system_score_codex":0.0007649889,"about_ca_system_score_gemma":0.0015967208,"threshold_uncertainty_score":0.007216096},"labels":[],"label_agreement":null},{"id":"W4296078337","doi":"10.29173/mocs266","title":"Using terrestrial laser scanning technology to assess the quality of prefabricated concrete modules","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"3D Surveying and Cultural Heritage","field":"Earth and Planetary Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"European Regional Development Fund; European Commission","keywords":"Formwork; Facade; Laser scanning; Factory (object-oriented programming); Quality (philosophy); Civil engineering; Engineering; Architectural engineering; Computer science; Engineering drawing; Construction engineering; Environmental science; Laser; Optics; Physics","score_opus":0.06530672909513809,"score_gpt":0.2872158228262708,"score_spread":0.2219090937311327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078337","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97953874,0.000118004005,0.018782172,0.00001095826,0.0000054529173,0.000021133115,0.00013061204,0.00006230121,0.0013306183],"genre_scores_gemma":[0.98831314,0.00010166675,0.010686212,0.000009592765,0.0000033384297,0.000013546506,0.000152941,0.00002148441,0.0006980813],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.999258,0.000065388595,0.000025175625,0.000097856406,0.0004972882,0.00005629339],"domain_scores_gemma":[0.99938095,0.00016103881,0.00010117698,0.000057122543,0.00027196264,0.000027722226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004617504,0.0003214114,0.0001745698,0.0015323916,0.00020558416,0.00045175396,0.00025513896,0.00048448506,0.0012209092],"category_scores_gemma":[0.0008830249,0.00019455308,0.0002469643,0.0012328969,0.00035286136,0.00034609405,0.0005320041,0.00034527492,0.00035039152],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033970948,0.000077000295,0.13087982,0.00024415585,0.000058392387,0.00032182684,0.0011870648,0.010591425,0.7517329,0.0004317867,0.00018581269,0.10395012],"study_design_scores_gemma":[0.000018041672,0.0010641299,0.6281682,0.00006797475,0.00008110158,0.0012280634,0.0020732682,0.027058903,0.3368787,0.000435559,0.002839542,0.00008659284],"about_ca_topic_score_codex":0.0011849023,"about_ca_topic_score_gemma":0.004430216,"teacher_disagreement_score":0.0015323916,"about_ca_system_score_codex":0.00018567701,"about_ca_system_score_gemma":0.0001949038,"threshold_uncertainty_score":0.0040843487},"labels":[],"label_agreement":null},{"id":"W4296078656","doi":"10.29173/mocs268","title":"Environment-aware worker trajectory prediction using surveillance camera on modular construction sites","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Exploit; Modular design; Trajectory; Computer science; Scheme (mathematics); Data mining; Artificial intelligence; Machine learning; Simulation; Real-time computing; Computer security","score_opus":0.04285407264216739,"score_gpt":0.32644222242599713,"score_spread":0.28358814978382973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078656","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74503535,0.001420855,0.24547553,0.00030424478,0.00014234557,0.0000789908,0.0026916063,0.0017864048,0.0030645751],"genre_scores_gemma":[0.9674896,0.00041830214,0.027326796,0.000027109843,0.000029602419,0.000031862757,0.0033773351,0.000029840341,0.001269455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99981135,0.000025392019,0.0000058504384,0.000080056394,0.000039700317,0.000037718753],"domain_scores_gemma":[0.9997594,0.0000570101,0.00004204042,0.00004277024,0.000065214714,0.000033566324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002360244,0.000952503,0.00059138244,0.00074710435,0.00024465768,0.00043375324,0.0007923794,0.00052786875,0.0007293205],"category_scores_gemma":[0.0007603684,0.00021699276,0.00045411024,0.0009188924,0.0002024946,0.0005433876,0.00059055025,0.00059523,0.00052003574],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042056481,0.0001892983,0.038562268,0.00011851193,0.00007552125,0.0003884851,0.000119717995,0.79126966,0.0077873394,0.000570996,0.003997136,0.1565005],"study_design_scores_gemma":[0.000003254253,0.000024609213,0.0043704608,0.000006860393,0.000005616982,0.00002277261,0.000031083157,0.9942677,0.0007989651,0.00019736387,0.00026646117,0.000004722072],"about_ca_topic_score_codex":0.021527408,"about_ca_topic_score_gemma":0.027484765,"teacher_disagreement_score":0.021527408,"about_ca_system_score_codex":0.00037366184,"about_ca_system_score_gemma":0.00054139335,"threshold_uncertainty_score":0.04280424},"labels":[],"label_agreement":null},{"id":"W4296078748","doi":"10.29173/mocs281","title":"Process evaluation of construction methods to quantify safety","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Process (computing); General partnership; Product (mathematics); Computer science; Variety (cybernetics); Construction industry; Construction engineering; Systems engineering; Engineering; Risk analysis (engineering); Process management; Business","score_opus":0.09701974846974885,"score_gpt":0.4924275974120582,"score_spread":0.39540784894230935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15985988,0.0025482397,0.751795,0.0005982475,0.00027088408,0.009444222,0.0009492839,0.00072960014,0.07380471],"genre_scores_gemma":[0.61155283,0.0014802838,0.3751601,0.00015869855,0.00006613534,0.005485364,0.0007700949,0.00022398871,0.0051025613],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.89977396,0.052476935,0.003751384,0.003063052,0.039834917,0.0010996832],"domain_scores_gemma":[0.850182,0.07875593,0.010947421,0.012530805,0.046644874,0.0009391159],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06319761,0.0019052303,0.0008523417,0.007120882,0.0011887046,0.0046482505,0.0018378324,0.0012702534,0.0047080396],"category_scores_gemma":[0.09653401,0.00039793624,0.0012045681,0.0047255782,0.0020543798,0.0035595447,0.0030436013,0.001281477,0.0005991594],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001217862,0.0018992284,0.03219086,0.0043397257,0.00045166668,0.00013492105,0.005330623,0.06311681,0.015290341,0.07663772,0.003906884,0.7954834],"study_design_scores_gemma":[0.00096711225,0.029215444,0.11109817,0.009074138,0.0012172846,0.00071871385,0.017390812,0.38723212,0.14489904,0.13100134,0.16649373,0.00069211633],"about_ca_topic_score_codex":0.003278991,"about_ca_topic_score_gemma":0.0031903062,"teacher_disagreement_score":0.06319761,"about_ca_system_score_codex":0.0059256344,"about_ca_system_score_gemma":0.006408878,"threshold_uncertainty_score":0.33422494},"labels":[],"label_agreement":null},{"id":"W4296078947","doi":"10.29173/mocs258","title":"A proposed conceptual framework for Computational Design Sustainability in Industrialized Building","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Underpinning; Mainstream; Context (archaeology); Satisficing; Management science; Conceptual framework; Computer science; Knowledge management; Process management; Risk analysis (engineering); Engineering; Business; Political science; Sociology; Civil engineering","score_opus":0.017388451956763723,"score_gpt":0.2360175156321324,"score_spread":0.2186290636753687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078947","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015252169,0.0020380383,0.84268737,0.013330541,0.00021620389,0.00032978415,0.00036338513,0.00037046534,0.12541209],"genre_scores_gemma":[0.50726503,0.0018001221,0.47579095,0.0011459554,0.00014509184,0.0012700964,0.00054906117,0.00011830198,0.011915385],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9971866,0.0016297526,0.00015000108,0.00044643847,0.00037093385,0.00021630501],"domain_scores_gemma":[0.99719256,0.0014821503,0.00026897708,0.00030158498,0.0004636829,0.0002909734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004982631,0.0010121593,0.0005777783,0.0043207007,0.0022548125,0.008167671,0.0041318582,0.0033623464,0.010156471],"category_scores_gemma":[0.00466977,0.00054600945,0.001586687,0.004101154,0.0131925745,0.008905064,0.004338572,0.0029737712,0.0009985898],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014551771,0.0000064494407,0.00011742617,0.000027797212,0.000003046904,0.000031934982,0.0006066393,0.0012878348,0.000028702163,0.9958326,0.00025244744,0.0018036839],"study_design_scores_gemma":[0.000011626684,0.000013354109,0.0001978227,0.00015838347,0.000011794437,0.000110679204,0.0017814497,0.013403972,0.00008580509,0.94343597,0.04077706,0.000012054678],"about_ca_topic_score_codex":0.0064341873,"about_ca_topic_score_gemma":0.0067119584,"teacher_disagreement_score":0.010156471,"about_ca_system_score_codex":0.004988268,"about_ca_system_score_gemma":0.004958242,"threshold_uncertainty_score":0.036192596},"labels":[],"label_agreement":null},{"id":"W4296079032","doi":"10.29173/mocs276","title":"Unmanned aerial vehicles usage on south african construction projects: perceived benefits","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Advanced Manufacturing and Logistics Optimization","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Asset (computer security); Construction industry; Project management; Data collection; Construction management; Quality (philosophy); Construction engineering; Transport engineering; Engineering; Computer science; Systems engineering; Civil engineering; Computer security","score_opus":0.011708309427374951,"score_gpt":0.1870430771672962,"score_spread":0.17533476773992127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079032","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995027,0.0006141608,0.00030505745,0.0004124303,0.0000074251325,0.000019632405,0.000021020978,0.0000018120118,0.0035914844],"genre_scores_gemma":[0.9979054,0.0012017615,0.00031310966,0.000036393874,0.00000409024,0.000011334474,0.0000104637975,0.0000012144556,0.0005162621],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9979736,0.000941328,0.000117551885,0.00008409503,0.0006088699,0.00027453888],"domain_scores_gemma":[0.9947647,0.0022611625,0.0018312309,0.00008580494,0.0006314888,0.00042561823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026018324,0.00025256668,0.0002171952,0.0012973017,0.0010803656,0.0016454621,0.00026308428,0.00051597366,0.002409267],"category_scores_gemma":[0.0066736834,0.0002513485,0.00023955687,0.0013129408,0.0009510017,0.0013404742,0.0014059566,0.00058589055,0.0001905152],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021643452,0.000584555,0.51604,0.0033524723,0.00012068796,0.005427342,0.26787362,0.0012719024,0.009571019,0.004931334,0.002138503,0.18847217],"study_design_scores_gemma":[0.0000072426715,0.00067289686,0.45712203,0.0013766155,0.00006438513,0.001455628,0.5186969,0.0008200099,0.0009752589,0.0005286778,0.018234115,0.000046179277],"about_ca_topic_score_codex":0.0023756565,"about_ca_topic_score_gemma":0.007106868,"teacher_disagreement_score":0.0026018324,"about_ca_system_score_codex":0.0008147419,"about_ca_system_score_gemma":0.0014143944,"threshold_uncertainty_score":0.013759971},"labels":[],"label_agreement":null},{"id":"W4296079037","doi":"10.29173/mocs273","title":"Data-driven cycle time prediction of fitting and welding stations in steel fabrication","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Manufacturing Process and Optimization","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Mitacs","keywords":"Benchmark (surveying); Computer science; Reliability (semiconductor); Process (computing); Welding; Fabrication; Predictive modelling; Reliability engineering; Industrial engineering; Data mining; Engineering; Machine learning; Mechanical engineering","score_opus":0.010561331842484766,"score_gpt":0.19464775962642156,"score_spread":0.1840864277839368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079037","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9275037,0.00028413266,0.06873382,0.00016987836,0.00004313419,0.000050603187,0.000877902,0.000649558,0.0016872901],"genre_scores_gemma":[0.99145,0.000084127765,0.0070058187,0.000012521935,0.000004798109,0.000027852302,0.00074712944,0.00002595167,0.0006417678],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973494,0.00004696305,0.000016572041,0.00008155785,0.00007990566,0.000040173036],"domain_scores_gemma":[0.9981263,0.0012001084,0.00019942115,0.000097044416,0.00031164847,0.000065431625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086545356,0.00069949013,0.00044763274,0.0010920065,0.00025958187,0.0008395551,0.000668986,0.0008051306,0.0011981959],"category_scores_gemma":[0.0037621523,0.00043416736,0.00056199916,0.001140407,0.00023363718,0.00064034195,0.00034490137,0.0009169399,0.00038877872],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001200519,0.00010164255,0.010984837,0.000049524624,0.00002043869,0.000043373067,0.000032143595,0.97193944,0.0010730168,0.00029845245,0.00029926386,0.01503785],"study_design_scores_gemma":[0.0000021887588,0.000020009766,0.0030413466,0.0000032247467,0.0000037199175,0.000004831454,0.000011335206,0.99580234,0.00084757677,0.0001416676,0.000116656905,0.000005045707],"about_ca_topic_score_codex":0.025283646,"about_ca_topic_score_gemma":0.021623315,"teacher_disagreement_score":0.025283646,"about_ca_system_score_codex":0.00093195465,"about_ca_system_score_gemma":0.0009667036,"threshold_uncertainty_score":0.05027294},"labels":[],"label_agreement":null},{"id":"W4296079369","doi":"10.29173/mocs278","title":"A principal component analysis of Organisational BIM Implementation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Nonprobability sampling; Building information modeling; Status quo; Process management; Yardstick; Process (computing); Knowledge management; Principal (computer security); Construction industry; Business; Competitive advantage; Computer science; Operations management; Engineering; Construction engineering; Marketing","score_opus":0.007207543096686039,"score_gpt":0.20973705302531076,"score_spread":0.20252950992862473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83545667,0.00012526482,0.117910065,0.00073066086,0.00019993109,0.003966971,0.0026818225,0.001406489,0.037522182],"genre_scores_gemma":[0.90763426,0.0001223225,0.08017442,0.00004318852,0.000027803188,0.0029156257,0.0019063356,0.00020005356,0.0069759768],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99193513,0.003261622,0.0005056854,0.0007763872,0.0030624943,0.00045871592],"domain_scores_gemma":[0.9845946,0.006307049,0.00094458385,0.0013289958,0.006499154,0.00032559378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00611563,0.0009982451,0.0006830865,0.0037753223,0.0011388616,0.003023875,0.000716272,0.00055805163,0.00830223],"category_scores_gemma":[0.028341495,0.00046055362,0.000986778,0.0061817043,0.00080942037,0.0010740458,0.0019421745,0.001129458,0.0018318038],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011044618,0.0013845679,0.2317164,0.00088612264,0.00066756766,0.0003263132,0.021678723,0.013886416,0.009224275,0.022433694,0.013014703,0.6836767],"study_design_scores_gemma":[0.000115198214,0.0014890827,0.83946246,0.0002440142,0.000375267,0.00020272961,0.018118821,0.092839606,0.006540084,0.006591661,0.033795,0.00022611898],"about_ca_topic_score_codex":0.009277361,"about_ca_topic_score_gemma":0.005122633,"teacher_disagreement_score":0.009277361,"about_ca_system_score_codex":0.0015631634,"about_ca_system_score_gemma":0.004221904,"threshold_uncertainty_score":0.03234291},"labels":[],"label_agreement":null},{"id":"W4296079407","doi":"10.29173/mocs265","title":"Lessons Learned from adopting modular construction in Brazil: A startup journey","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Standardization; Business; Revenue; Variety (cybernetics); Scale (ratio); Investment (military); Product (mathematics); Marketing; New product development; Start up; Operations management; Process management; Engineering management; Engineering; Finance; Computer science; Political science; Business administration","score_opus":0.021997019170221628,"score_gpt":0.23070827472586747,"score_spread":0.20871125555564585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079407","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9387191,0.0022106778,0.0045058937,0.019710321,0.00016237283,0.00022872354,0.00006898838,0.000057729525,0.034336176],"genre_scores_gemma":[0.9819,0.0025757393,0.0040729544,0.0014364423,0.000024453215,0.000075883145,0.000048569058,0.000054493157,0.009811481],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9956333,0.0023071046,0.00013150957,0.0003476117,0.000706311,0.0008741399],"domain_scores_gemma":[0.99507904,0.0019916217,0.00040386242,0.00023338004,0.000800634,0.0014914202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064228354,0.0005558904,0.00046194502,0.0010395378,0.0069009685,0.0056900145,0.0014302955,0.0019461716,0.0033095132],"category_scores_gemma":[0.009175764,0.00062210095,0.0004595069,0.001150357,0.00606179,0.004391803,0.007807392,0.003460847,0.00047909352],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030325999,0.0002237075,0.013254706,0.0003347031,0.000008542119,0.0061769034,0.90467685,0.00032201747,0.001958965,0.021967325,0.003934258,0.047111575],"study_design_scores_gemma":[0.0000064128944,0.00015994515,0.007425288,0.000681116,0.0000079042375,0.0015084395,0.85540676,0.00035320708,0.0005678238,0.0034686448,0.13037466,0.00003982322],"about_ca_topic_score_codex":0.023402888,"about_ca_topic_score_gemma":0.06633037,"teacher_disagreement_score":0.023402888,"about_ca_system_score_codex":0.007121098,"about_ca_system_score_gemma":0.009625181,"threshold_uncertainty_score":0.05166745},"labels":[],"label_agreement":null},{"id":"W4296079452","doi":"10.29173/mocs283","title":"Layout modelling of the built environment for autonomous mobile robots using Building Information Modelling (BIM) and simulation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Robot; Building information modeling; Mobile robot; Robotics; Computer science; A priori and a posteriori; Systems engineering; Artificial intelligence; Human–computer interaction; Control engineering; Simulation; Engineering","score_opus":0.01766596912926466,"score_gpt":0.19896615713084348,"score_spread":0.18130018800157882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079452","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02055761,0.00009482526,0.97212684,0.000071092734,0.00002602403,0.000078073994,0.00023397584,0.0012562546,0.0055553154],"genre_scores_gemma":[0.49957544,0.000453905,0.49345908,0.000039260314,0.000015248339,0.0004008579,0.0009102395,0.00034312706,0.00480283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967194,0.00008491583,0.000022698869,0.000051257044,0.00014156722,0.000027735907],"domain_scores_gemma":[0.9997111,0.000116888405,0.000040134284,0.000051921626,0.00006138282,0.000018525148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003528886,0.00078865926,0.00067254156,0.0009184867,0.0005938148,0.0013671097,0.001078285,0.0008631179,0.0036996242],"category_scores_gemma":[0.00091368955,0.00065217627,0.00096068,0.00077665143,0.0005234498,0.0008181838,0.0012746159,0.0005107338,0.0009328933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001884585,0.000023570978,0.0007310003,0.00007599508,0.000012581478,0.00010513928,0.00013070677,0.9706378,0.0025146261,0.0046215383,0.00040318194,0.020725062],"study_design_scores_gemma":[0.0000059474296,0.000014185615,0.00029215304,0.0000149658745,0.000007933624,0.00005215679,0.00005611585,0.9933119,0.0010786164,0.0019091201,0.0032458415,0.000011135172],"about_ca_topic_score_codex":0.009017015,"about_ca_topic_score_gemma":0.012459213,"teacher_disagreement_score":0.009017015,"about_ca_system_score_codex":0.00054342847,"about_ca_system_score_gemma":0.0013886627,"threshold_uncertainty_score":0.017929077},"labels":[],"label_agreement":null},{"id":"W4296079545","doi":"10.29173/mocs269","title":"Computer-vision based rapid entire body analysis (REBA) estimation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Occupational Health and Safety Research","field":"Health Professions","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Automation; Computer science; Estimation; Artificial intelligence; Machine learning; Human factors and ergonomics; Risk assessment; Computer users; Human–computer interaction; Simulation; Poison control; Engineering; Computer security; Systems engineering","score_opus":0.022875518944422128,"score_gpt":0.3566776122637854,"score_spread":0.3338020933193633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079545","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0458965,0.00051944284,0.9496548,0.000067043584,0.00006111833,0.00009813195,0.0001276957,0.00095790863,0.0026173524],"genre_scores_gemma":[0.6416043,0.0008535991,0.35153785,0.00015207763,0.00007101125,0.00018831683,0.00042539396,0.00016912419,0.004998394],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99921024,0.00017106821,0.000034451812,0.00018203503,0.00032102622,0.00008122947],"domain_scores_gemma":[0.99929416,0.00023572454,0.00012880709,0.00006567832,0.00023767262,0.000037988433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006407248,0.0009227976,0.0006508119,0.0017304907,0.00022212729,0.0005534891,0.0005441738,0.00068061275,0.002128975],"category_scores_gemma":[0.0014417788,0.00031645896,0.0005916838,0.0005534495,0.0003415647,0.0006333898,0.0008603582,0.00041994345,0.0009133135],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040282318,0.00026087387,0.011958295,0.0003509834,0.00015232798,0.00020175177,0.00017118825,0.047378406,0.16162223,0.0017551088,0.0030589707,0.7726871],"study_design_scores_gemma":[0.000058484835,0.0008587459,0.07258136,0.00012194354,0.00016464962,0.0019408907,0.00023418287,0.8148255,0.09484321,0.005152316,0.009043856,0.00017488144],"about_ca_topic_score_codex":0.0011467389,"about_ca_topic_score_gemma":0.0019975784,"teacher_disagreement_score":0.002128975,"about_ca_system_score_codex":0.00019305886,"about_ca_system_score_gemma":0.00043082458,"threshold_uncertainty_score":0.007122159},"labels":[],"label_agreement":null},{"id":"W4296079640","doi":"10.29173/mocs280","title":"Investigation of a novel insulation foam made from gypsum drywall waste","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Recycled Aggregate Concrete Performance","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Washington Research Foundation","keywords":"Waste management; Thermal insulation; Flammable liquid; Gypsum; Combustibility; Reuse; Foam concrete; Greenhouse gas; Environmental science; Building insulation; Materials science; Engineering; Combustion; Composite material; Cement","score_opus":0.011273619604635165,"score_gpt":0.1738663286808394,"score_spread":0.16259270907620424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962251,0.00033199074,0.0017743886,0.00001919286,0.000007626002,0.000023724215,0.000110182584,0.00001884272,0.0014888999],"genre_scores_gemma":[0.99264705,0.0007632169,0.0049347887,0.000018123566,0.000004980099,0.000022991975,0.00029472954,0.0000110052115,0.0013032279],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99985874,0.000012621875,0.0000075951957,0.000021404416,0.0000711472,0.00002846215],"domain_scores_gemma":[0.9999206,0.000014395688,0.00002459771,0.000008431516,0.000020091868,0.000011852099],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019352383,0.00025421142,0.00015729462,0.0004767408,0.00019951462,0.0002681835,0.00014425092,0.0003235836,0.00036952374],"category_scores_gemma":[0.00016629245,0.00007898235,0.00025010447,0.00024393585,0.00020887573,0.0002634158,0.00018888245,0.0002504273,0.00012695946],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048052516,0.000048518436,0.00082294806,0.00007968759,0.000004723479,0.00014739716,0.000026922777,0.0003555712,0.99395144,0.0001426689,0.000024686957,0.0043473956],"study_design_scores_gemma":[0.000004284389,0.0005414999,0.004703556,0.00001181189,0.000011372075,0.00026546343,0.000054235294,0.00062595686,0.99192107,0.000041428986,0.0018158321,0.0000034973564],"about_ca_topic_score_codex":0.00038296197,"about_ca_topic_score_gemma":0.0008165497,"teacher_disagreement_score":0.0004767408,"about_ca_system_score_codex":0.00014796286,"about_ca_system_score_gemma":0.00022453922,"threshold_uncertainty_score":0.0012361407},"labels":[],"label_agreement":null},{"id":"W4296079691","doi":"10.29173/mocs277","title":"Hindering factors to the utilisation of UAVs for construction projects in South Africa","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Aviation Industry Analysis and Trends","field":"Economics, Econometrics and Finance","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Drone; Software deployment; Construction industry; Integrated project delivery; Investment (military); Business; Construction engineering; Engineering management; Construction management; Engineering; Process management; Civil engineering; Political science; Politics","score_opus":0.04714594478015876,"score_gpt":0.2111585434556014,"score_spread":0.16401259867544263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99679834,0.00019377413,0.000249988,0.0005123261,0.0000033834926,0.000022609285,0.000024289557,0.000002111959,0.0021933021],"genre_scores_gemma":[0.99871886,0.00042620912,0.0002532158,0.00002525002,0.0000018816233,0.0000136005565,0.000009750081,0.0000017247639,0.0005494629],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99816066,0.0007636244,0.00013571163,0.00008942198,0.0003115525,0.0005390123],"domain_scores_gemma":[0.9918133,0.0032519184,0.003252472,0.00014681158,0.0006355669,0.0008999104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017205743,0.0002124449,0.00015767288,0.00090804667,0.0012313513,0.001559541,0.00034498208,0.0003243242,0.0032073641],"category_scores_gemma":[0.008320171,0.0002445954,0.00012007647,0.001399659,0.0007755728,0.0007919937,0.0010769474,0.0004375738,0.00019189091],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021206385,0.00035900302,0.7857327,0.0011626398,0.00005620403,0.0066576614,0.091742024,0.0016344897,0.010077692,0.007411605,0.0017849487,0.093168944],"study_design_scores_gemma":[0.000008284906,0.00023503468,0.8042013,0.00068470294,0.00002812212,0.0011948529,0.17155506,0.0010650033,0.0010159333,0.0005864014,0.019392665,0.000032589516],"about_ca_topic_score_codex":0.020414537,"about_ca_topic_score_gemma":0.03967442,"teacher_disagreement_score":0.020414537,"about_ca_system_score_codex":0.0016686972,"about_ca_system_score_gemma":0.0043277587,"threshold_uncertainty_score":0.04059142},"labels":[],"label_agreement":null},{"id":"W4296079866","doi":"10.29173/mocs255","title":"Design-for-Manufacturing-and-Assembly (DfMA) for the construction industry: A review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal; Polytechnique Montréal","funders":"Fonds de recherche du Québec – Nature et technologies; National Research Council Canada; Polytechnique Montréal","keywords":"Engineering; Systematic review; Construction industry; Computer science; Engineering management; Manufacturing engineering; Construction engineering","score_opus":0.04268418942031275,"score_gpt":0.2647113452291091,"score_spread":0.22202715580879637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079866","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011621179,0.9986035,0.00017344678,0.00020698429,0.000104362305,0.000010957239,0.000013016959,0.000004128833,0.00076748047],"genre_scores_gemma":[0.0010789097,0.9981845,0.00039346688,0.00011913649,0.000050126222,0.000015040464,0.000016474982,0.0000019070284,0.0001404691],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99824727,0.00042684565,0.00040292786,0.00017602413,0.0006753998,0.0000714533],"domain_scores_gemma":[0.9931953,0.0048349886,0.0006697782,0.00012174162,0.0010400097,0.00013815842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002795699,0.0011733124,0.0014561747,0.008387399,0.0007295276,0.0022414844,0.0013024297,0.0019349775,0.0034708176],"category_scores_gemma":[0.006275892,0.0006228707,0.0012142978,0.01161127,0.0009145758,0.0026640033,0.0011697715,0.0014888012,0.0009458106],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028873294,0.000075514436,0.0004838317,0.20185004,0.0002526908,0.00019747167,0.0005064894,0.00043706238,0.0006990464,0.0065155337,0.017078498,0.771875],"study_design_scores_gemma":[0.000012361656,0.00012756971,0.0024981333,0.12190226,0.0007699494,0.0011566281,0.0006718414,0.00016016002,0.00048660138,0.0024268082,0.86974764,0.000039978153],"about_ca_topic_score_codex":0.0054488173,"about_ca_topic_score_gemma":0.012233418,"teacher_disagreement_score":0.008387399,"about_ca_system_score_codex":0.0018872566,"about_ca_system_score_gemma":0.00815523,"threshold_uncertainty_score":0.01478523},"labels":[],"label_agreement":null},{"id":"W4296168341","doi":"10.29173/mocs264","title":"AWP for residential buildings to modular construction: A proposed framework","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Transport and Logistics Innovations","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Constructability; Modular design; Productivity; Modularity (biology); Work (physics); Engineering; Architectural engineering; Risk analysis (engineering); Systems engineering; Computer science; Business","score_opus":0.010043940022693529,"score_gpt":0.21242236883331558,"score_spread":0.20237842881062207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168341","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004855534,0.00081904395,0.9368084,0.0025707104,0.00014839892,0.00043194476,0.00020694223,0.0004747325,0.053684287],"genre_scores_gemma":[0.12966548,0.0018079332,0.8555934,0.00038037877,0.00018332257,0.000868972,0.00052376284,0.00010112281,0.010875662],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9984804,0.00053317496,0.00012193286,0.00031657366,0.00035417176,0.00019376341],"domain_scores_gemma":[0.999172,0.00023113607,0.00011081646,0.000110280365,0.00023308645,0.00014277615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019124646,0.0010325974,0.00040770133,0.0026981707,0.0017253482,0.004688175,0.0024385115,0.0025253813,0.00854005],"category_scores_gemma":[0.0020462272,0.0005662606,0.0018257841,0.0027320113,0.0033065276,0.005298471,0.004334561,0.0019036197,0.001966465],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009854208,0.00008004102,0.00091393467,0.0001743031,0.000014623182,0.00046538666,0.000725862,0.010895684,0.0006116388,0.9450677,0.0032443786,0.037796654],"study_design_scores_gemma":[0.000030932693,0.00012091066,0.001485974,0.00069755944,0.00007048978,0.0011807198,0.0020804228,0.20031731,0.00091827137,0.6111401,0.18187954,0.00007765532],"about_ca_topic_score_codex":0.009506021,"about_ca_topic_score_gemma":0.008613557,"teacher_disagreement_score":0.009506021,"about_ca_system_score_codex":0.0020293351,"about_ca_system_score_gemma":0.003604315,"threshold_uncertainty_score":0.02856934},"labels":[],"label_agreement":null},{"id":"W4296168358","doi":"10.29173/mocs259","title":"Modular construction and circularity. A case study of a mass timber design studio","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Studio; Architectural engineering; Engineering; Design studio; Construction engineering; Computer science","score_opus":0.014971954708739455,"score_gpt":0.20521641973344756,"score_spread":0.1902444650247081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168358","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93522227,0.00019011981,0.013898331,0.00062923913,0.000022267643,0.00019552358,0.000035373545,0.000050225193,0.04975664],"genre_scores_gemma":[0.9666922,0.00023217729,0.015701469,0.00009339151,0.0000067758738,0.00006418159,0.00003676743,0.00002525791,0.017147737],"study_design_codex":"qualitative","study_design_gemma":"case_report","domain_scores_codex":[0.99825007,0.0011230741,0.000043339896,0.0001400118,0.0002495376,0.00019392333],"domain_scores_gemma":[0.99825495,0.00096437417,0.00015576638,0.00017348069,0.00008581464,0.00036561317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002300166,0.0004018854,0.00016721418,0.0004940505,0.0022798346,0.0022390713,0.0008671168,0.0014183566,0.00540828],"category_scores_gemma":[0.002847863,0.0003636811,0.00042916532,0.00049929036,0.0032274888,0.001210735,0.0028525614,0.0011034544,0.0007240957],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009354358,0.0060464395,0.08025253,0.0016748497,0.000092905764,0.040176857,0.3305091,0.0320806,0.04373809,0.15041777,0.011315554,0.3027598],"study_design_scores_gemma":[0.00027996642,0.0054645785,0.09185974,0.0011149328,0.00013965485,0.026808772,0.2659731,0.03774335,0.035341334,0.037889924,0.49717188,0.0002127213],"about_ca_topic_score_codex":0.0016118407,"about_ca_topic_score_gemma":0.010383566,"teacher_disagreement_score":0.00540828,"about_ca_system_score_codex":0.0014794271,"about_ca_system_score_gemma":0.0014667943,"threshold_uncertainty_score":0.018092513},"labels":[],"label_agreement":null},{"id":"W4296168386","doi":"10.29173/mocs271","title":"Keyword identification framework for speech communication on construction sites","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Speech recognition; Identification (biology); Mel-frequency cepstrum; Convolutional neural network; Speaker identification; Artificial intelligence; Speaker recognition; Feature extraction","score_opus":0.01208817909986937,"score_gpt":0.21989485929685795,"score_spread":0.20780668019698859,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168386","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058607467,0.0014469924,0.92806935,0.0005054935,0.00014588078,0.00024423166,0.0011227961,0.004842834,0.005014882],"genre_scores_gemma":[0.7186874,0.001247144,0.25768712,0.0003616636,0.00022890729,0.00050158374,0.003536307,0.00030428043,0.017445559],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937624,0.00009881645,0.0000372308,0.00020873487,0.00018468492,0.00009425121],"domain_scores_gemma":[0.9995115,0.00014391041,0.00007122804,0.000036467263,0.00019847273,0.00003843755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062677095,0.00092487317,0.0007098453,0.00096681505,0.00046395333,0.00068134384,0.001211816,0.0011143597,0.0023685463],"category_scores_gemma":[0.0013717546,0.00021000722,0.0007606811,0.00050233264,0.00036557313,0.00104795,0.00090589345,0.0010243274,0.0018991585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009774739,0.0006790163,0.00847731,0.0006779461,0.00021398763,0.0016258878,0.0008839242,0.2726462,0.08324345,0.013259339,0.01650712,0.6008084],"study_design_scores_gemma":[0.000015191347,0.00014295803,0.002364761,0.00002461173,0.000036292528,0.00025513547,0.00024403707,0.9809625,0.007845854,0.0035114922,0.0045583174,0.000038900715],"about_ca_topic_score_codex":0.016168233,"about_ca_topic_score_gemma":0.015553479,"teacher_disagreement_score":0.016168233,"about_ca_system_score_codex":0.0009215175,"about_ca_system_score_gemma":0.001619699,"threshold_uncertainty_score":0.032148242},"labels":[],"label_agreement":null},{"id":"W4296168686","doi":"10.29173/mocs282","title":"A systematic review of quality management of offsite construction","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Policy Innovation and Co-ordination Office","keywords":"Systematic review; Scopus; Quality (philosophy); Popularity; Quality management; Scope (computer science); Business; Knowledge management; Process management; Engineering; Computer science; Operations management; Political science; Management system; MEDLINE","score_opus":0.020881981109741925,"score_gpt":0.2611452180721949,"score_spread":0.24026323696245294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168686","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00070322515,0.997846,0.0002023184,0.0002340859,0.00011551064,0.00023735264,0.00022101028,0.0000055081136,0.00043500026],"genre_scores_gemma":[0.007016129,0.9913805,0.00070904056,0.00024626142,0.000054413427,0.00031398554,0.00016950502,0.0000035421695,0.000106548614],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9899088,0.0034990571,0.0035749108,0.00065893005,0.0021155109,0.00024280153],"domain_scores_gemma":[0.9654527,0.022594774,0.005847158,0.0005649027,0.0051264353,0.00041407513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009823569,0.0014848051,0.0044296733,0.016450135,0.00093710475,0.0027421361,0.0018124318,0.0017731214,0.0039488752],"category_scores_gemma":[0.04606996,0.0009511065,0.0040816856,0.017319536,0.0009873181,0.0030329607,0.0016719947,0.0011792948,0.00041704913],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008669507,0.000025262016,0.0006198064,0.89359015,0.0020186356,0.00015444504,0.0004300114,0.00010350296,0.00022247956,0.0004124794,0.002900163,0.099436335],"study_design_scores_gemma":[0.000066905624,0.00017473988,0.00382622,0.9267595,0.01405548,0.0004932549,0.0005707533,0.00006892445,0.00026059514,0.00034222845,0.053346362,0.00003505686],"about_ca_topic_score_codex":0.009466137,"about_ca_topic_score_gemma":0.030693013,"teacher_disagreement_score":0.016450135,"about_ca_system_score_codex":0.0042274566,"about_ca_system_score_gemma":0.020887414,"threshold_uncertainty_score":0.05195266},"labels":[],"label_agreement":null},{"id":"W4296169950","doi":"10.29173/mocs261","title":"Development of decision-making tool for construction method selection: choosing and optimizing offsite construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Ranking (information retrieval); Process (computing); Computer science; Quality (philosophy); Selection (genetic algorithm); Decision analysis; Construction management; Risk analysis (engineering); Engineering; Management science; Construction engineering; Systems engineering; Operations research; Artificial intelligence; Civil engineering","score_opus":0.034971622901461046,"score_gpt":0.32613620353795686,"score_spread":0.2911645806364958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296169950","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034859553,0.00021401336,0.95256865,0.00039442332,0.000044763652,0.001855585,0.00042509512,0.0014225222,0.008215402],"genre_scores_gemma":[0.074666366,0.00013734562,0.9228234,0.000041547803,0.000011167327,0.0009751558,0.00040623825,0.00008453422,0.0008541486],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98894686,0.0054908693,0.0010117083,0.0009852381,0.0030179154,0.0005474645],"domain_scores_gemma":[0.98254806,0.0099075325,0.0014371258,0.0010691562,0.0044517857,0.00058626314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016308052,0.0023454106,0.0017002707,0.00793911,0.0015980038,0.0051366836,0.0021918037,0.00154658,0.00634201],"category_scores_gemma":[0.02363246,0.00088873896,0.0016104653,0.0034499033,0.00073884067,0.0033339919,0.0023500635,0.0015096111,0.0013871606],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005369921,0.0011191776,0.008367817,0.0017877583,0.00020759345,0.00052508025,0.0024350968,0.08456667,0.019222269,0.029464774,0.00792162,0.8438451],"study_design_scores_gemma":[0.0004117887,0.0013190829,0.008716212,0.0015452233,0.00037732825,0.0005911423,0.0038205981,0.8204394,0.05551786,0.054822594,0.052065156,0.00037372086],"about_ca_topic_score_codex":0.0013629165,"about_ca_topic_score_gemma":0.0019392929,"teacher_disagreement_score":0.016308052,"about_ca_system_score_codex":0.001913457,"about_ca_system_score_gemma":0.0059183585,"threshold_uncertainty_score":0.08624625},"labels":[],"label_agreement":null},{"id":"W4296172102","doi":"10.29173/mocs274","title":"A Fuzzy-AHP and House of Quality integrated approach for Lean Construction Concepts Assessment in Off-site Construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Quality and Management Systems","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Lean project management; Lean manufacturing; Value stream mapping; Analytic hierarchy process; Lean construction; Ranking (information retrieval); Pairwise comparison; House of Quality; Process (computing); Factory (object-oriented programming); Quality (philosophy); Computer science; Process management; Manufacturing engineering; Engineering; Risk analysis (engineering); Operations research; Business; Service quality; Construction engineering; Construction industry; Artificial intelligence","score_opus":0.02220022137242876,"score_gpt":0.26200601952290675,"score_spread":0.23980579815047798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296172102","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013552431,0.00015008685,0.9816259,0.00012347904,0.000036362504,0.0005515642,0.00012201416,0.00015853495,0.0036795961],"genre_scores_gemma":[0.229201,0.00022600446,0.76780146,0.000060098166,0.000022446276,0.0010807281,0.00028052452,0.000031643845,0.0012960276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9952975,0.0018216482,0.00032480102,0.0003785157,0.0018944222,0.0002830888],"domain_scores_gemma":[0.99799216,0.00089292316,0.00019342004,0.00006770898,0.0007787776,0.000074981326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047542723,0.0011799791,0.0011842026,0.0038898417,0.0017837979,0.0021511344,0.0016227105,0.0010523775,0.0027735059],"category_scores_gemma":[0.005448394,0.000690761,0.001609846,0.0036203903,0.0007477953,0.001506312,0.0020076823,0.0013386798,0.0002196386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018566787,0.0003476215,0.0025932365,0.00086190354,0.00026012023,0.00030127174,0.0009088518,0.7283213,0.004052336,0.029965505,0.0025016996,0.22970057],"study_design_scores_gemma":[0.000034127817,0.00011661838,0.00061551936,0.000064562366,0.000050785457,0.000046135232,0.00034778935,0.9862536,0.0015244103,0.008821736,0.0020953538,0.000029257875],"about_ca_topic_score_codex":0.016524473,"about_ca_topic_score_gemma":0.020096341,"teacher_disagreement_score":0.016524473,"about_ca_system_score_codex":0.0028920195,"about_ca_system_score_gemma":0.005001525,"threshold_uncertainty_score":0.032856584},"labels":[],"label_agreement":null},{"id":"W4296272403","doi":"10.29173/mocs284","title":"An holistic approach to product evaluation and selection in industrialised building: Benchmarking of long span, low carbon floor systems","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Melbourne; Monash University; Australian Government","keywords":"Benchmarking; Product (mathematics); Quality (philosophy); Selection (genetic algorithm); Key (lock); Systems engineering; New product development; Computer science; Risk analysis (engineering); Production (economics); Process management; Engineering; Architectural engineering; Construction engineering; Business; Marketing; Artificial intelligence","score_opus":0.017320336266655204,"score_gpt":0.2296527835737729,"score_spread":0.2123324473071177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40585038,0.0011146029,0.5473206,0.0013244923,0.000059852093,0.0008124401,0.0002758053,0.00037019418,0.04287174],"genre_scores_gemma":[0.8172139,0.00036541454,0.18100248,0.000062634164,0.000008531299,0.00026763687,0.00010936383,0.000034512243,0.0009355023],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9734072,0.019419724,0.00079560326,0.0006757602,0.0051333415,0.0005684196],"domain_scores_gemma":[0.99039817,0.004676159,0.0009351011,0.0010477371,0.0026082802,0.0003345744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01677096,0.0008233081,0.0010538172,0.004565804,0.0016002221,0.004875658,0.0015908942,0.0008401393,0.0016181313],"category_scores_gemma":[0.020546699,0.0003411514,0.00046256965,0.0059775785,0.00263433,0.0032748529,0.0034218845,0.0009937434,0.00020984748],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064562995,0.00077356584,0.030237468,0.0013609267,0.00021824233,0.00052107696,0.014450149,0.1811947,0.028051374,0.087846786,0.0024097387,0.6522903],"study_design_scores_gemma":[0.00020442296,0.006747876,0.10163043,0.0015068749,0.00030116524,0.0012428979,0.057422694,0.50841594,0.07076593,0.19565074,0.055538785,0.000572242],"about_ca_topic_score_codex":0.0042131348,"about_ca_topic_score_gemma":0.008522985,"teacher_disagreement_score":0.01677096,"about_ca_system_score_codex":0.0038935721,"about_ca_system_score_gemma":0.004000882,"threshold_uncertainty_score":0.08869439},"labels":[],"label_agreement":null},{"id":"W4296272583","doi":"10.29173/mocs287","title":"Carbon emissions comparison in modular and site-built residential construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Modular design; Life-cycle assessment; Prefabrication; Construction waste; Environmental impact assessment; Productivity; Environmental economics; Engineering; Environmental resource management; Business; Production (economics); Environmental planning; Environmental science; Civil engineering; Waste management; Computer science; Economics","score_opus":0.007888409632422756,"score_gpt":0.2051085963982159,"score_spread":0.19722018676579314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9128108,0.036505558,0.009509415,0.00031206704,0.00009970686,0.00015731184,0.0013705316,0.000050229897,0.039184485],"genre_scores_gemma":[0.98006034,0.011928912,0.004988007,0.0000701198,0.000024224575,0.000072691575,0.0008141983,0.000020770867,0.0020207402],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99905246,0.00024181712,0.0000628757,0.00011190135,0.0004604594,0.00007055914],"domain_scores_gemma":[0.9989573,0.00042444034,0.00015436998,0.000042748074,0.0003955921,0.000025556343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009565677,0.00038522005,0.0002889594,0.0042415666,0.00025691433,0.0012539786,0.0004020155,0.00041588946,0.0015815105],"category_scores_gemma":[0.0013743123,0.00012060202,0.00069347984,0.0048876107,0.00031647072,0.0012057981,0.00053190294,0.00021699545,0.00016210454],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013692167,0.00042310244,0.21310872,0.011778907,0.0010379953,0.0031687561,0.00291784,0.036511105,0.031740718,0.03953196,0.0049534347,0.6534583],"study_design_scores_gemma":[0.000040164756,0.0015036911,0.76584953,0.0033480579,0.0017740992,0.0027846918,0.010589268,0.036192723,0.0529575,0.017790979,0.10698227,0.00018694393],"about_ca_topic_score_codex":0.0042938762,"about_ca_topic_score_gemma":0.01849857,"teacher_disagreement_score":0.0042938762,"about_ca_system_score_codex":0.0013677719,"about_ca_system_score_gemma":0.0006935929,"threshold_uncertainty_score":0.009923995},"labels":[],"label_agreement":null},{"id":"W4296272818","doi":"10.29173/mocs275","title":"Affordable wall panels using sustainable waste materials: a review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Carbon footprint; Modular design; Sustainability; Resource depletion; Population; Urbanization; Ecological footprint; Greenhouse gas; Engineering; Sustainable development; Business; Waste management; Economic growth; Computer science; Economics","score_opus":0.027773413603414267,"score_gpt":0.24862296377579834,"score_spread":0.22084955017238408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272818","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003215566,0.9972825,0.0001858395,0.00016366591,0.00014525437,0.00001505437,0.000030104562,0.0000053512863,0.0018506],"genre_scores_gemma":[0.0012459403,0.99796754,0.00026435294,0.00007707039,0.000057278503,0.000011073667,0.000026180704,0.0000017715552,0.000348798],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994161,0.000086586646,0.00010695777,0.00008642495,0.0002533926,0.000050528288],"domain_scores_gemma":[0.9990227,0.0005291342,0.00017397676,0.000021907847,0.00021645274,0.000035704023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008893539,0.0010357324,0.0012344756,0.004448815,0.000494603,0.002038563,0.0010689324,0.0014473047,0.004654158],"category_scores_gemma":[0.0012313237,0.000496245,0.001110781,0.0047988775,0.00046982354,0.0021370822,0.00090190774,0.00095361075,0.0012951567],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060286406,0.000171291,0.00037313337,0.13832612,0.00019052262,0.0004387065,0.00027625554,0.0008237975,0.0026281269,0.008609061,0.023870397,0.8242322],"study_design_scores_gemma":[0.000006078835,0.00012566682,0.0008188022,0.026797114,0.00029132995,0.0008773348,0.00021756082,0.0001603988,0.0014330356,0.0013863835,0.96785796,0.000028269225],"about_ca_topic_score_codex":0.0021852206,"about_ca_topic_score_gemma":0.003516691,"teacher_disagreement_score":0.004654158,"about_ca_system_score_codex":0.0006150376,"about_ca_system_score_gemma":0.0021796103,"threshold_uncertainty_score":0.0155697465},"labels":[],"label_agreement":null},{"id":"W4296273859","doi":"10.29173/mocs272","title":"Simulation-based value stream map for manual steel fabrication workstations","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Digital Transformation in Industry","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Mitacs","keywords":"Value stream mapping; Workstation; Scope (computer science); Process (computing); Lean manufacturing; Computer science; Fabrication; Manufacturing engineering; Plan (archaeology); Welding; Industrial engineering; Process engineering; Engineering; Mechanical engineering","score_opus":0.01209472572991855,"score_gpt":0.22555570998768662,"score_spread":0.21346098425776808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296273859","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3666779,0.00043520858,0.58758885,0.0009056238,0.00015268619,0.0005933333,0.003915036,0.0042071883,0.035524152],"genre_scores_gemma":[0.89342636,0.0002798289,0.100451045,0.00004831325,0.00001557088,0.00037857887,0.001757415,0.000114047325,0.0035288932],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978954,0.000062178755,0.000011271468,0.000038263443,0.000054587683,0.00004416684],"domain_scores_gemma":[0.99905556,0.00057066244,0.00007083539,0.000041862768,0.00018598961,0.000075013275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063323375,0.0008293051,0.0006574481,0.0013881703,0.0006221881,0.0016512029,0.0011772335,0.0011372599,0.007905455],"category_scores_gemma":[0.002050162,0.0005114273,0.000873913,0.0010471955,0.00039713527,0.00097310235,0.0010045507,0.00076460704,0.0004890078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046735968,0.00003172914,0.00091641134,0.000021343705,0.0000069640478,0.000026988077,0.00003262812,0.9937459,0.00015647836,0.0015401286,0.00028610777,0.0031884057],"study_design_scores_gemma":[0.000006948369,0.000009325296,0.00010051075,0.0000040053897,0.0000023075102,0.0000024187666,0.000017112452,0.99877065,0.000089414694,0.0007079017,0.00028601734,0.0000033669658],"about_ca_topic_score_codex":0.044402096,"about_ca_topic_score_gemma":0.032072768,"teacher_disagreement_score":0.044402096,"about_ca_system_score_codex":0.0020064074,"about_ca_system_score_gemma":0.0024692689,"threshold_uncertainty_score":0.088287294},"labels":[],"label_agreement":null},{"id":"W4296274119","doi":"10.29173/mocs267","title":"Offsite Construction education adoption in Civil Engineering undergraduate curriculum: analysis and proposal","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Engineering and Safety","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Curriculum; Proposition; Exploratory research; Engineering; Engineering management; Medical education; Psychology; Pedagogy; Medicine; Sociology","score_opus":0.0023512298339943174,"score_gpt":0.16902579441221535,"score_spread":0.16667456457822102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296274119","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99447143,0.00007817427,0.0007974867,0.00029382316,0.000009576893,0.000772833,0.0001512553,0.00000905564,0.0034164258],"genre_scores_gemma":[0.994426,0.00024265824,0.0021027415,0.000081174905,0.00000878992,0.0011951895,0.00031591547,0.0000069506204,0.0016204654],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9925868,0.0027069151,0.0005343434,0.000771421,0.0020040888,0.0013964241],"domain_scores_gemma":[0.97452253,0.013724095,0.0032836774,0.0008244963,0.0062428727,0.0014023235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009004578,0.0004727931,0.0006004139,0.0051533417,0.0015793963,0.0036301923,0.0015236919,0.0008260494,0.006314137],"category_scores_gemma":[0.028238608,0.0005486949,0.0011942021,0.0066833505,0.0018063113,0.0022686224,0.002880036,0.001283998,0.0004727476],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014675518,0.0015140352,0.8678953,0.00062678783,0.00006489481,0.00040594957,0.053924546,0.00025995309,0.0007237051,0.004667681,0.000921329,0.06884901],"study_design_scores_gemma":[0.000021362135,0.00065762154,0.8038234,0.0003679515,0.00009605049,0.00016161126,0.1890881,0.0016498353,0.00067185104,0.00037170696,0.0030685838,0.000021905837],"about_ca_topic_score_codex":0.012231172,"about_ca_topic_score_gemma":0.008146553,"teacher_disagreement_score":0.012231172,"about_ca_system_score_codex":0.0066356477,"about_ca_system_score_gemma":0.011311861,"threshold_uncertainty_score":0.048145235},"labels":[],"label_agreement":null},{"id":"W4393184024","doi":"10.29173/mocs24.190","title":"Lessons from Sweden: How Australia Can Learn from Swedish Industrialised Building","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Facilities and Workplace Management","field":"Psychology","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Geography; Political science; Environmental planning; Architectural engineering; Engineering","score_opus":0.045896464996239075,"score_gpt":0.2842151346294422,"score_spread":0.23831866963320314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393184024","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4750052,0.015679428,0.0017917763,0.10709194,0.0020111478,0.00008750716,0.00008589517,0.00008461165,0.39816248],"genre_scores_gemma":[0.8640394,0.016926564,0.0027138297,0.015217014,0.0003514888,0.00006515085,0.000120021534,0.00017615796,0.100390315],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.996707,0.0018747939,0.00010103781,0.0001884852,0.00044970767,0.00067903777],"domain_scores_gemma":[0.99795073,0.0007240718,0.00012993405,0.000117005846,0.0003521782,0.00072622043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004215734,0.0006943462,0.0005354469,0.0012831588,0.014761616,0.012172222,0.001423319,0.0025312786,0.0060620625],"category_scores_gemma":[0.0042358534,0.00045366332,0.00058214716,0.0013688711,0.006245333,0.0065549957,0.010587863,0.005746322,0.0017650393],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004848253,0.00015464627,0.0041198735,0.00033636348,0.000013799373,0.0040137256,0.8682155,0.00017845041,0.00032042048,0.033581376,0.027413785,0.061603513],"study_design_scores_gemma":[0.0000055533224,0.000054801803,0.0027052648,0.0008204286,0.000011303945,0.0006138661,0.6241243,0.0001258063,0.00018716378,0.006298819,0.3650309,0.000021877977],"about_ca_topic_score_codex":0.064253435,"about_ca_topic_score_gemma":0.19775653,"teacher_disagreement_score":0.064253435,"about_ca_system_score_codex":0.0077745677,"about_ca_system_score_gemma":0.011696074,"threshold_uncertainty_score":0.12775892},"labels":[],"label_agreement":null},{"id":"W4415764114","doi":"10.29173/mocs313","title":"Enhancing Thermal Comfort and Energy Efficiency in Buildings Using Artificial Intelligence: A Systematic Literature Review","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Building Energy and Comfort Optimization","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Thermal comfort; Efficient energy use; Systematic review; Air conditioning; Energy (signal processing); Energy consumption; Occupancy","score_opus":0.007311452237755616,"score_gpt":0.21877325715978402,"score_spread":0.2114618049220284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764114","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013878187,0.9972295,0.00032249984,0.00028969167,0.00005304186,0.00009828414,0.00017535083,0.000006251816,0.0004375532],"genre_scores_gemma":[0.011236169,0.98730755,0.0009183722,0.0002004088,0.000037060236,0.000115601106,0.000110491375,0.0000028053946,0.00007149988],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9975752,0.00077574875,0.00080554635,0.00021360675,0.0005440737,0.00008575605],"domain_scores_gemma":[0.98389256,0.012337793,0.001732465,0.00019627252,0.0016741003,0.00016687723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045496044,0.0010643379,0.0024610711,0.011100014,0.00042991462,0.0021840555,0.0010192319,0.0011117253,0.0028465455],"category_scores_gemma":[0.01841517,0.00060078054,0.0035444733,0.012490499,0.0006288712,0.0016595237,0.0010092523,0.0007751465,0.00026367564],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000108531065,0.0000623697,0.0024177593,0.7524471,0.0029530965,0.00015539005,0.0005362056,0.00053151604,0.00024023323,0.0011083194,0.0031341824,0.2363052],"study_design_scores_gemma":[0.00006749815,0.00027477345,0.009985352,0.90498936,0.02382985,0.0006608486,0.0009864845,0.00043893265,0.00036719517,0.0010999767,0.057236787,0.0000628509],"about_ca_topic_score_codex":0.0088747265,"about_ca_topic_score_gemma":0.02631021,"teacher_disagreement_score":0.011100014,"about_ca_system_score_codex":0.0019635342,"about_ca_system_score_gemma":0.011289016,"threshold_uncertainty_score":0.024060905},"labels":[],"label_agreement":null},{"id":"W4415764115","doi":"10.29173/mocs315","title":"Building Planning Capacity in the Offsite Construction Industry: Introducing the Theory of Constraints for Process Optimization","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Operations Management Techniques","field":"Decision Sciences","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Scalability; Production (economics); Theory of constraints; Production planning; Capacity planning; Strategic planning","score_opus":0.047936670351136045,"score_gpt":0.32482773979583224,"score_spread":0.2768910694446962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764115","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010547999,0.00041707465,0.96814626,0.0011092622,0.00005054669,0.0001007898,0.000081979284,0.00006869952,0.019477356],"genre_scores_gemma":[0.5915625,0.0017105326,0.40024734,0.0002583758,0.000090014124,0.00047756633,0.00017554329,0.00012644006,0.0053516426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99828726,0.00090546015,0.00006204064,0.0001937494,0.00038811087,0.00016339064],"domain_scores_gemma":[0.9963097,0.0025436184,0.0004102378,0.00023692618,0.00031695366,0.00018252137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019827168,0.0013406555,0.0007208072,0.0017678323,0.0007932025,0.003386579,0.0017884729,0.0012572304,0.004249314],"category_scores_gemma":[0.007104265,0.0005878312,0.00078584114,0.0025744298,0.0031114714,0.0037520113,0.003498395,0.0022430196,0.0002552363],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016239781,0.000034378074,0.0005360756,0.00009419678,0.000019502557,0.0001286603,0.00021125637,0.5894635,0.0004565183,0.3845559,0.00084772095,0.023636103],"study_design_scores_gemma":[0.000009225726,0.000047495338,0.00028747975,0.00012538105,0.000011652194,0.000050959046,0.00034544716,0.7162773,0.0007118023,0.26993674,0.012163319,0.000033072898],"about_ca_topic_score_codex":0.01119672,"about_ca_topic_score_gemma":0.010612939,"teacher_disagreement_score":0.01119672,"about_ca_system_score_codex":0.0028288257,"about_ca_system_score_gemma":0.004260229,"threshold_uncertainty_score":0.02226311},"labels":[],"label_agreement":null},{"id":"W4415764117","doi":"10.29173/mocs311","title":"Activity Sequencing Optimization in Petroleum Projects Using Simulation Modeling","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Resource-Constrained Project Scheduling","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Refinery; Scheduling (production processes); Upgrade; Simulation-based optimization; Baseline (sea); Interdependence; Simulation modeling; Task (project management)","score_opus":0.07642454252690692,"score_gpt":0.3343477742731084,"score_spread":0.25792323174620146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764117","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27697197,0.00034536875,0.7047203,0.00035291264,0.000033395812,0.00021173536,0.0003875695,0.00053674565,0.016440067],"genre_scores_gemma":[0.92678696,0.0003647662,0.06956714,0.000036769845,0.00000830559,0.00028557063,0.0002535905,0.000057261917,0.0026397533],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996362,0.00021129,0.000015615373,0.000035935966,0.000056944777,0.00004403],"domain_scores_gemma":[0.9990478,0.0007158594,0.00009308205,0.00003033117,0.00007938666,0.000033412245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007753053,0.00067835336,0.0006247379,0.0005346065,0.00033917357,0.0008200899,0.00060837326,0.00058797013,0.0013347422],"category_scores_gemma":[0.0016723999,0.00044276813,0.00068755326,0.00060408266,0.00043892502,0.0005011029,0.00054952345,0.0005575279,0.0001242243],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006423081,0.000004864954,0.0001166228,0.0000033699196,0.0000023753798,0.0000036103413,0.000004189479,0.9986339,0.00007501981,0.00057314476,0.00001564635,0.0005607927],"study_design_scores_gemma":[0.0000028165828,0.000005252333,0.000033242715,0.0000015924456,0.0000014868048,0.0000010147592,0.0000029576115,0.99946064,0.00008573634,0.00029972306,0.000104328334,0.0000012458548],"about_ca_topic_score_codex":0.023334557,"about_ca_topic_score_gemma":0.014923297,"teacher_disagreement_score":0.023334557,"about_ca_system_score_codex":0.0014370682,"about_ca_system_score_gemma":0.0019567106,"threshold_uncertainty_score":0.046397507},"labels":[],"label_agreement":null},{"id":"W4415764122","doi":"10.29173/mocs312","title":"Interdependence between Factors Influencing the Selection of Project Delivery Systems and Modular Construction","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Context (archaeology); Ambiguity; Selection (genetic algorithm); Modular design; Pre-construction services; Project management; Construction management; Project management triangle","score_opus":0.01006478965792922,"score_gpt":0.21383549293992637,"score_spread":0.20377070328199715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764122","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63491637,0.28246018,0.034678552,0.005747764,0.00034739266,0.0027342746,0.0010936487,0.000078224904,0.037943564],"genre_scores_gemma":[0.9259052,0.05105652,0.020480521,0.00036498922,0.000056926838,0.0007475527,0.00023943151,0.00003362231,0.0011151225],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.95342827,0.027305542,0.006990193,0.001967694,0.009291361,0.001016941],"domain_scores_gemma":[0.7686764,0.19198805,0.025045801,0.0018688749,0.011124126,0.0012967801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.032234553,0.00044855048,0.0008021608,0.0049278317,0.0011497742,0.0040272838,0.0009755317,0.0009915857,0.0029767642],"category_scores_gemma":[0.10591618,0.0005075151,0.0013302827,0.008273565,0.0017577024,0.0037647574,0.0016503887,0.0008982645,0.0003701187],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060231757,0.00025693048,0.28784397,0.085696146,0.0018043432,0.0014723066,0.024775106,0.0027424064,0.0026309155,0.013852295,0.0031614234,0.5751619],"study_design_scores_gemma":[0.0001726161,0.0011110577,0.7253794,0.069180824,0.004122273,0.0033386657,0.065062344,0.002832389,0.0041890503,0.016463323,0.10780186,0.00034618354],"about_ca_topic_score_codex":0.0047487365,"about_ca_topic_score_gemma":0.010181401,"teacher_disagreement_score":0.032234553,"about_ca_system_score_codex":0.003570263,"about_ca_system_score_gemma":0.008784658,"threshold_uncertainty_score":0.17047465},"labels":[],"label_agreement":null},{"id":"W4415764123","doi":"10.29173/mocs317","title":"Barriers and Potential Solutions to the Adoption of Modular and Offsite Construction: A Review","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Modular design; Foundation (evidence); Key (lock); Sustainability; Field (mathematics)","score_opus":0.00585997719051752,"score_gpt":0.20008737709929617,"score_spread":0.19422739990877866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764123","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00088623393,0.9952199,0.00033306653,0.0018598977,0.00018231684,0.000021914113,0.000016765911,0.000006980159,0.0014729175],"genre_scores_gemma":[0.00539006,0.99341595,0.0005052606,0.00041831742,0.00006340755,0.000027426511,0.000020668193,0.0000032921498,0.00015560762],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99659365,0.0009874267,0.00078799936,0.00031685815,0.0010760007,0.00023798822],"domain_scores_gemma":[0.9817478,0.013816785,0.0017891575,0.00013854475,0.0021949017,0.00031279717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057849535,0.0008878342,0.0013619342,0.0058755293,0.00095015083,0.00339517,0.0017414404,0.0024250331,0.002569361],"category_scores_gemma":[0.014409147,0.00069948076,0.0013240655,0.006520355,0.0018384552,0.0036623736,0.0017820393,0.0020676325,0.00042792058],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053523305,0.00012620783,0.0018385553,0.13573645,0.00024927148,0.00027620982,0.0026399028,0.0006714059,0.00048364353,0.02093362,0.014731543,0.8222596],"study_design_scores_gemma":[0.000018121173,0.00018155624,0.0059941965,0.21100208,0.0009572785,0.0014930279,0.0069013666,0.0004438943,0.0008884619,0.0051517226,0.7668706,0.000097804],"about_ca_topic_score_codex":0.009556248,"about_ca_topic_score_gemma":0.01756712,"teacher_disagreement_score":0.009556248,"about_ca_system_score_codex":0.0028615042,"about_ca_system_score_gemma":0.012445235,"threshold_uncertainty_score":0.03059417},"labels":[],"label_agreement":null},{"id":"W4415764125","doi":"10.29173/mocs310","title":"Decarbonization of Modular Construction and LEED v5 Certification","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"California State University, Sacramento","keywords":"Demolition; Certification; Embodied energy; Greenhouse gas; Modular design; Resource efficiency; Sustainability; Life-cycle assessment; Carbon footprint","score_opus":0.006101554106341071,"score_gpt":0.19626254823648398,"score_spread":0.1901609941301429,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79403305,0.0023993924,0.057689127,0.00087333826,0.00038479475,0.00078443426,0.0007998734,0.0008076074,0.14222851],"genre_scores_gemma":[0.967573,0.00070504856,0.018014051,0.00015079635,0.000021654028,0.00010652339,0.00049014384,0.000057156143,0.012881626],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988078,0.00014017102,0.000044347187,0.00012180918,0.0006648796,0.00022113239],"domain_scores_gemma":[0.9994388,0.000051357274,0.00015141342,0.00009074202,0.00020116643,0.00006655995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006890732,0.0003733679,0.00018732475,0.0012616147,0.0004259256,0.00085851643,0.0006594867,0.0005368328,0.004789602],"category_scores_gemma":[0.0012254822,0.00013422263,0.0004852338,0.00077609805,0.0005201094,0.0006376025,0.0012190691,0.0005239412,0.00060758815],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065559545,0.0011611584,0.03646381,0.0018159045,0.00007103928,0.0020171378,0.000796036,0.053559072,0.16478287,0.055649847,0.014252526,0.6687751],"study_design_scores_gemma":[0.0001960905,0.0039951247,0.14086537,0.00080156676,0.00018438576,0.0022396483,0.0019419722,0.05950197,0.31726122,0.015736727,0.45702994,0.0002460216],"about_ca_topic_score_codex":0.0037606764,"about_ca_topic_score_gemma":0.008500048,"teacher_disagreement_score":0.004789602,"about_ca_system_score_codex":0.0012881947,"about_ca_system_score_gemma":0.0014569799,"threshold_uncertainty_score":0.016022801},"labels":[],"label_agreement":null},{"id":"W4415764127","doi":"10.29173/mocs308","title":"Cable-Driven Parallel Robot for Module Facade Seam Sealing in Modular Construction: Static Workspace Analysis","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Innovations in Concrete and Construction Materials","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Robot; Workspace; Seal (emblem); Parallel manipulator; Facade","score_opus":0.010211926885917235,"score_gpt":0.2425263090413994,"score_spread":0.23231438215548217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764127","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69611764,0.0002390614,0.29836965,0.000035288554,0.000016894212,0.00004721338,0.00010342053,0.00043627046,0.0046345675],"genre_scores_gemma":[0.96756864,0.0001126302,0.030987255,0.0000050206436,0.000002449752,0.000030243435,0.000073517804,0.000022592045,0.0011977486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979657,0.000026987076,0.000006959879,0.000045309123,0.00009473513,0.000029530314],"domain_scores_gemma":[0.9995146,0.00013114208,0.000107107146,0.00007666189,0.00013549867,0.00003506304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003351168,0.00035935495,0.00022220248,0.0005114114,0.00021920407,0.00022163289,0.00043838128,0.00025087778,0.0016051717],"category_scores_gemma":[0.00080011605,0.00019156496,0.00027564546,0.00030921708,0.00032498906,0.00053750636,0.0005917845,0.00016179337,0.00027750447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010590598,0.00029846895,0.022080094,0.00089980394,0.00006183703,0.00068373414,0.00073614315,0.3765545,0.32762462,0.0060363817,0.0013600738,0.26260534],"study_design_scores_gemma":[0.00004482908,0.0020352558,0.028596057,0.00004999767,0.00008112405,0.000578166,0.00065804174,0.83856463,0.12279599,0.0018516941,0.00466484,0.000079397774],"about_ca_topic_score_codex":0.00082068687,"about_ca_topic_score_gemma":0.00095887267,"teacher_disagreement_score":0.0016051717,"about_ca_system_score_codex":0.00019297567,"about_ca_system_score_gemma":0.0003985262,"threshold_uncertainty_score":0.005369842},"labels":[],"label_agreement":null},{"id":"W4415764132","doi":"10.29173/mocs309","title":"A Data-Driven Framework for Automated Generation of PC Component Trailer Arrival Times: Integrating Work Interruptions Simulation and Duration Prediction","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; National Research Foundation","keywords":"Component (thermodynamics); Duration (music); Arrival time; Work (physics); Precast concrete; Intuition","score_opus":0.035211647481511385,"score_gpt":0.2800561496355948,"score_spread":0.24484450215408338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025459472,0.000031096588,0.99468875,0.00004383365,0.000011007421,0.00006884876,0.0002168197,0.0017692697,0.00062432786],"genre_scores_gemma":[0.18292892,0.00012694387,0.8142489,0.00005343861,0.000027165719,0.0004010811,0.0011374005,0.00035867508,0.00071743125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988121,0.0002674132,0.000115910734,0.00025876542,0.0004485845,0.0000973702],"domain_scores_gemma":[0.99698514,0.0015454732,0.00029220022,0.00033793357,0.00065393036,0.00018525084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029110624,0.0013603987,0.0012230154,0.0020648243,0.00072083634,0.0025066123,0.0027674444,0.0011092938,0.0028075913],"category_scores_gemma":[0.0065481337,0.00087130046,0.0014985915,0.0012225704,0.0006841691,0.0014577799,0.0017221032,0.0016970139,0.0007778654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009922907,0.0001608418,0.0023608115,0.00013490379,0.00007115408,0.00012818229,0.00022737513,0.9156219,0.002540647,0.015786523,0.0016777717,0.061190616],"study_design_scores_gemma":[0.000008950317,0.000012406475,0.00012551204,0.00001461281,0.0000075708895,0.000015701662,0.000016627382,0.9935282,0.000826453,0.0041548703,0.0012762215,0.000012818354],"about_ca_topic_score_codex":0.017882967,"about_ca_topic_score_gemma":0.02008677,"teacher_disagreement_score":0.017882967,"about_ca_system_score_codex":0.0014179257,"about_ca_system_score_gemma":0.0029945252,"threshold_uncertainty_score":0.035557747},"labels":[],"label_agreement":null},{"id":"W4415764133","doi":"10.29173/mocs314","title":"Navigating Barriers to the Adoption and Scalability of Modular Construction in Ethiopia","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Interdependence; Scalability; Supply chain; Process (computing); Key (lock); Resilience (materials science); Fuzzy logic","score_opus":0.016645267708234116,"score_gpt":0.3017042716191671,"score_spread":0.285059003910933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764133","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98865926,0.00025736546,0.002056521,0.00078859803,0.0000101895885,0.00006447853,0.000044327364,0.000007327927,0.008111993],"genre_scores_gemma":[0.998211,0.00020459817,0.00107508,0.00004793361,0.0000019539789,0.000018729692,0.000013272706,0.0000024783096,0.00042505484],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99708384,0.0012440502,0.00016487646,0.00016776189,0.0006676981,0.0006718198],"domain_scores_gemma":[0.994822,0.0026891318,0.0010247807,0.00021162919,0.0007901258,0.00046229266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052364315,0.0002753269,0.00020137285,0.0010759901,0.0013537278,0.0026070226,0.00074664276,0.0005120341,0.002230111],"category_scores_gemma":[0.0070299464,0.00027313095,0.00017020754,0.0010622501,0.0014111786,0.0015644946,0.0020565896,0.0006284575,0.00012062779],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005583686,0.000988165,0.4546123,0.0023159478,0.00014720617,0.006691397,0.09790796,0.015364717,0.015554782,0.10834839,0.004669876,0.29284084],"study_design_scores_gemma":[0.00005213813,0.0009311022,0.44987956,0.002907553,0.00014819873,0.0018816846,0.39682114,0.0182388,0.00812302,0.029337514,0.09149394,0.00018539354],"about_ca_topic_score_codex":0.008264396,"about_ca_topic_score_gemma":0.014392126,"teacher_disagreement_score":0.008264396,"about_ca_system_score_codex":0.003682973,"about_ca_system_score_gemma":0.0065544187,"threshold_uncertainty_score":0.027693212},"labels":[],"label_agreement":null},{"id":"W4415764138","doi":"10.29173/mocs319","title":"Front Matter, MOC Summit 2025 Proceedings","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Digital and Traditional Archives Management","field":"Arts and Humanities","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Modular design; Government (linguistics)","score_opus":0.011015893076333766,"score_gpt":0.1992451421808993,"score_spread":0.18822924910456554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764138","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012045744,0.0025195922,0.0002549934,0.016915265,0.02687581,0.00015490815,0.0064482214,0.0005279839,0.9450987],"genre_scores_gemma":[0.0034449366,0.0009556783,0.00018761278,0.0016227191,0.0018409765,0.00003552469,0.0023833425,0.00019822453,0.989331],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99859816,0.000050644714,0.000042861928,0.00009366889,0.00097635755,0.00023829844],"domain_scores_gemma":[0.9959688,0.00017751673,0.00007122225,0.00019180411,0.0021639045,0.0014266749],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001408529,0.0007515842,0.00049730635,0.001780504,0.0038231143,0.006553822,0.0010192435,0.0020965661,0.6089891],"category_scores_gemma":[0.004130891,0.00024364854,0.00038025284,0.0015958591,0.00092101365,0.0011339897,0.002223754,0.0019370256,0.36474892],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009296111,0.0000060129287,0.00009198631,0.000021733576,5.857649e-7,0.000013699614,0.000012149855,0.00001261057,0.000034986,0.00029655028,0.99035394,0.009146479],"study_design_scores_gemma":[0.0000032280411,0.0000027474314,0.00063408935,0.00003676587,7.88034e-7,0.0000072293074,0.00007115405,0.000015470518,0.000038814538,0.00008490448,0.9991019,0.0000028978725],"about_ca_topic_score_codex":0.1917856,"about_ca_topic_score_gemma":0.42119783,"teacher_disagreement_score":0.6089891,"about_ca_system_score_codex":0.0060618473,"about_ca_system_score_gemma":0.012749845,"threshold_uncertainty_score":0.55772954},"labels":[],"label_agreement":null},{"id":"W4415764146","doi":"10.29173/mocs316","title":"Research Trends in Affordable Modular Housing","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Workforce; Bridge (graph theory); Housing industry; Affordable housing; Key (lock); Thematic analysis","score_opus":0.017219948824789198,"score_gpt":0.27059377251128985,"score_spread":0.25337382368650063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764146","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2670061,0.3439305,0.01666908,0.1857962,0.003449899,0.00019680201,0.0009903421,0.00013783548,0.18182328],"genre_scores_gemma":[0.802966,0.16505024,0.01006203,0.00872286,0.0021882888,0.00020691358,0.0006094441,0.000113225855,0.010081019],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98895824,0.0037375798,0.0007959475,0.001970156,0.003833058,0.00070502714],"domain_scores_gemma":[0.9497813,0.03410799,0.0042071124,0.0014285431,0.009075061,0.0013999956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021104997,0.0002669931,0.00047019092,0.0064280503,0.0014877773,0.0061524264,0.001467184,0.0019883977,0.0077065863],"category_scores_gemma":[0.03452246,0.00035181723,0.00044184516,0.017891135,0.0050875163,0.010775089,0.0041934536,0.0023357093,0.0006879862],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012700672,0.00013349764,0.024363799,0.008012495,0.000055976645,0.0006073696,0.07108263,0.00076494407,0.0017261254,0.38760224,0.023142535,0.48238146],"study_design_scores_gemma":[0.000014939093,0.00027640277,0.06134501,0.009415155,0.000051082705,0.000878126,0.09695873,0.0010868245,0.0016840857,0.032638773,0.7955859,0.00006501517],"about_ca_topic_score_codex":0.0067352788,"about_ca_topic_score_gemma":0.008920375,"teacher_disagreement_score":0.021104997,"about_ca_system_score_codex":0.0063131354,"about_ca_system_score_gemma":0.00918432,"threshold_uncertainty_score":0.11161518},"labels":[],"label_agreement":null},{"id":"W4415764156","doi":"10.29173/mocs318","title":"A Rapid Literature Review of Environmental Performance of Offsite Building Construction Industry","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Greenhouse gas; Construction industry; Life-cycle assessment; Foundation (evidence); Modular construction","score_opus":0.003960116945552411,"score_gpt":0.1904519762553096,"score_spread":0.1864918593097572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764156","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002046977,0.99053544,0.00040680243,0.001851485,0.00034075623,0.000021278585,0.0003934154,0.000016441798,0.004387447],"genre_scores_gemma":[0.009925275,0.9876122,0.00066054286,0.00076177233,0.00020917399,0.000022098897,0.000352918,0.000010303427,0.00044566963],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99689794,0.00077600393,0.0006504016,0.0003819893,0.0011390017,0.0001546861],"domain_scores_gemma":[0.97084856,0.019602902,0.0020153765,0.000468596,0.0066966885,0.0003677921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004303957,0.0008181616,0.0014854388,0.024197001,0.00072389387,0.0031256403,0.0010829268,0.0015461899,0.005091266],"category_scores_gemma":[0.0136225335,0.0004999311,0.0018356888,0.03002806,0.0010064198,0.004086146,0.0011979418,0.001495444,0.00092638034],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008826797,0.000076315286,0.0034969572,0.18710692,0.0004608304,0.00040733273,0.0014869403,0.0008511106,0.0013094089,0.009465068,0.052122157,0.74312866],"study_design_scores_gemma":[0.000009213945,0.00014093048,0.024823904,0.24064352,0.0014652382,0.00094700063,0.0035696258,0.0003422983,0.0009694503,0.003167474,0.7238365,0.0000848327],"about_ca_topic_score_codex":0.012544796,"about_ca_topic_score_gemma":0.027130673,"teacher_disagreement_score":0.024197001,"about_ca_system_score_codex":0.003819941,"about_ca_system_score_gemma":0.01043842,"threshold_uncertainty_score":0.027715743},"labels":[],"label_agreement":null},{"id":"W4415764193","doi":"10.29173/mocs306","title":"Comparative Study of YOLO Architectures for Automated Wood Defect Detection","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"Industrial Vision Systems and Defect Detection","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Feature (linguistics); Quality (philosophy); Trim; Key (lock); Engineered wood; Automated X-ray inspection; Principal (computer security)","score_opus":0.01591524834611261,"score_gpt":0.2626792971433867,"score_spread":0.24676404879727412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764193","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83591634,0.0032243317,0.14594266,0.00032100466,0.00016237113,0.00021913843,0.000929924,0.0062623504,0.007022009],"genre_scores_gemma":[0.90302455,0.00093546574,0.08941539,0.00012216369,0.000027637801,0.000085421976,0.0032813426,0.00023589136,0.0028720782],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99914646,0.00017135561,0.000042344094,0.0002811922,0.00022748586,0.00013113681],"domain_scores_gemma":[0.9982168,0.0007543803,0.00017072597,0.00025737262,0.0004962963,0.00010427633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018232638,0.000996896,0.0006679969,0.0019991572,0.00031614924,0.0011659836,0.0013737483,0.00067892735,0.0015327974],"category_scores_gemma":[0.0035695843,0.00041236254,0.0006605699,0.0007835948,0.00035906132,0.0015010944,0.00097235496,0.0004995429,0.00087221124],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026787391,0.0006816136,0.025089074,0.0004872913,0.00027184875,0.00017803231,0.00027695257,0.27390966,0.027952887,0.0030577357,0.00818419,0.657232],"study_design_scores_gemma":[0.00003366416,0.00053977995,0.0068112034,0.00003669212,0.00005964319,0.00007482994,0.0001128366,0.9820203,0.007776743,0.00046488564,0.0020474633,0.000022006383],"about_ca_topic_score_codex":0.014854009,"about_ca_topic_score_gemma":0.020533053,"teacher_disagreement_score":0.014854009,"about_ca_system_score_codex":0.0012605416,"about_ca_system_score_gemma":0.0008966039,"threshold_uncertainty_score":0.029535115},"labels":[],"label_agreement":null}]}