{"meta":{"query_hash":"c489c6ca0519","filters":{"venue":"Mosty"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/c489c6ca0519","api":"https://metacan.xera.ac/api/v1/cohort?venue=Mosty"},"results":[{"id":"W2600152190","doi":"","title":"Budowa wiaduktu WD-1 w ciągu Trasy Słowackiego - odc. III w Gdańsku","year":2013,"lang":"pl","type":"article","venue":"Mosty","topic":"Structural Engineering and Materials Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomembrane Technologies (Canada)","funders":"","keywords":"Physics; Theology; Philosophy","score_opus":0.0037443087726130534,"score_gpt":0.16425508299831948,"score_spread":0.16051077422570642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2600152190","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6709848,0.007778064,0.048951704,0.0017476777,0.0017403263,0.00078987575,0.012018917,0.002912127,0.25307652],"genre_scores_gemma":[0.7301983,0.0034379559,0.036951922,0.000626959,0.00011919401,0.0004848836,0.010822111,0.0012859923,0.21607277],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.999506,0.00001795224,0.000028933782,0.00012003853,0.00016805303,0.00015908027],"domain_scores_gemma":[0.99968123,0.00001413491,0.000028486449,0.00005034618,0.00012193174,0.000103861596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003475525,0.0005766736,0.00080487516,0.0022522244,0.0015937126,0.0023572093,0.0006804139,0.0006977381,0.019027913],"category_scores_gemma":[0.00053587655,0.00034996084,0.0005726309,0.0012505864,0.0008290668,0.0011206489,0.0018483019,0.0014308869,0.006814573],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030771494,0.0009373889,0.04104342,0.0021089008,0.00023171245,0.0031826315,0.0027344353,0.0035422386,0.4425407,0.06911372,0.044762176,0.38672554],"study_design_scores_gemma":[0.000093887065,0.0005988576,0.073546275,0.00040444903,0.00018882728,0.004468939,0.0023794877,0.0024470256,0.17559999,0.011964742,0.72816014,0.00014739807],"about_ca_topic_score_codex":0.006001866,"about_ca_topic_score_gemma":0.009327079,"teacher_disagreement_score":0.019027913,"about_ca_system_score_codex":0.0013165666,"about_ca_system_score_gemma":0.0015681044,"threshold_uncertainty_score":0.06365472},"labels":[],"label_agreement":null},{"id":"W2921380303","doi":"","title":"Specyfika realizacji obiektów kolejowych wykonanych pod czynnym ruchem","year":2013,"lang":"pl","type":"article","venue":"Mosty","topic":"Transportation Systems and Safety","field":"Computer Science","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomembrane Technologies (Canada)","funders":"","keywords":"Physics","score_opus":0.01065364978302003,"score_gpt":0.2006186622277119,"score_spread":0.18996501244469188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921380303","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57442063,0.00364498,0.2312703,0.0013514134,0.0007261546,0.00049107027,0.001437401,0.0026879166,0.18397011],"genre_scores_gemma":[0.8938112,0.0025536453,0.054947365,0.00013832015,0.00011031274,0.00020100261,0.00087769923,0.0006506432,0.046709802],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99905974,0.000105215935,0.000060873233,0.00019487647,0.00032629224,0.00025299468],"domain_scores_gemma":[0.99925727,0.00012363041,0.00007838338,0.00020644575,0.00023774228,0.00009646959],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065003574,0.00062021473,0.0006853143,0.0013534958,0.0012829528,0.004129771,0.00072360487,0.00078612834,0.017625373],"category_scores_gemma":[0.0015876937,0.000410932,0.0005560107,0.0009053748,0.0011528246,0.0030933658,0.0021895014,0.0013831122,0.0032486536],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018281081,0.0008516448,0.044712532,0.0021031303,0.00024889334,0.0039430424,0.01037942,0.014436613,0.13991745,0.2790216,0.015806839,0.48675087],"study_design_scores_gemma":[0.0002269641,0.0015494658,0.11949884,0.0012064548,0.0008072879,0.005569187,0.022277534,0.03668683,0.18983085,0.1899571,0.4319196,0.00046987302],"about_ca_topic_score_codex":0.0036992691,"about_ca_topic_score_gemma":0.0043151365,"teacher_disagreement_score":0.017625373,"about_ca_system_score_codex":0.00081054796,"about_ca_system_score_gemma":0.0018576911,"threshold_uncertainty_score":0.058962703},"labels":[],"label_agreement":null},{"id":"W2975697733","doi":"","title":"Usprawnienie procesu projektowego drogowych i kubaturowych obiektów inżynierskich poprzez zastosowanie programów 3D BIM","year":2017,"lang":"pl","type":"article","venue":"Mosty","topic":"Structural Engineering and Materials Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomembrane Technologies (Canada)","funders":"","keywords":"Engineering","score_opus":0.011642309028851005,"score_gpt":0.24419205133699437,"score_spread":0.23254974230814338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2975697733","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43900594,0.0008544845,0.42043906,0.00041127432,0.00021834334,0.00049538945,0.0013403231,0.004298458,0.13293672],"genre_scores_gemma":[0.6997047,0.001170896,0.2585381,0.000097273776,0.000026993253,0.0003878947,0.001388209,0.0012764826,0.03740942],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993911,0.00006448739,0.000027432632,0.00008017338,0.00031827707,0.00011857177],"domain_scores_gemma":[0.9997086,0.000038288817,0.000023502382,0.00008949653,0.000096401855,0.000043762164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006745765,0.0005315066,0.00037642216,0.0010614824,0.0006945576,0.0026241927,0.0005852381,0.00042718815,0.0173679],"category_scores_gemma":[0.00079098035,0.00038788526,0.0004309182,0.00083450956,0.0004827959,0.001489387,0.0020977936,0.0006341098,0.0030084692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005733285,0.00067837053,0.0174337,0.0014069877,0.00008665283,0.0005522693,0.0030241392,0.053605337,0.18062994,0.09136361,0.008721635,0.641924],"study_design_scores_gemma":[0.00013180377,0.0014124947,0.050697785,0.00041242925,0.00029059465,0.0018278883,0.0053861598,0.12486988,0.35055804,0.041516352,0.42270535,0.00019117807],"about_ca_topic_score_codex":0.0012626937,"about_ca_topic_score_gemma":0.002246592,"teacher_disagreement_score":0.0173679,"about_ca_system_score_codex":0.00040741172,"about_ca_system_score_gemma":0.0013879845,"threshold_uncertainty_score":0.058101416},"labels":[],"label_agreement":null}]}