{"meta":{"query_hash":"6fde7b513daa","filters":{"venue":"Ninth International Conference on Asphalt PavementsInternational Society for Asphalt Pavements"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/6fde7b513daa","api":"https://metacan.xera.ac/api/v1/cohort?venue=Ninth+International+Conference+on+Asphalt+PavementsInternational+Society+for+Asphalt+Pavements"},"results":[{"id":"W2118356114","doi":"","title":"ASSET VALUATION METHODOLOGIES AND PERFORMANCE MEASUREMENT IN LIFE-CYCLE ANALYSIS","year":2002,"lang":"en","type":"article","venue":"Ninth International Conference on Asphalt PavementsInternational Society for Asphalt Pavements","topic":"Infrastructure Maintenance and Monitoring","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"IT asset management; Valuation (finance); Asset management; Risk analysis (engineering); Asset (computer security); Asset turnover; Business; Life-cycle cost analysis; Actuarial science; Computer science; Environmental economics; Economics; Finance; Computer security","score_opus":0.12094271005120216,"score_gpt":0.3208179816339544,"score_spread":0.19987527158275226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118356114","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00810703,0.0034473792,0.976351,0.00037342444,0.000074176474,0.00027922558,0.00021380934,0.00019092172,0.010963039],"genre_scores_gemma":[0.2856191,0.006715953,0.7036444,0.00017047927,0.00027505693,0.001037755,0.0004486896,0.0001146696,0.0019738635],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.978119,0.015184304,0.0011714842,0.0007632449,0.0043899734,0.00037189203],"domain_scores_gemma":[0.9703039,0.020887196,0.0031238396,0.0023548955,0.003073056,0.00025699075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017518803,0.0014737219,0.001085405,0.0055459132,0.00046293467,0.0048286603,0.001867143,0.0010558511,0.001436289],"category_scores_gemma":[0.03529938,0.000558768,0.0007403088,0.008955924,0.0020448975,0.0048629753,0.0016031128,0.002069107,0.0005954164],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000083590516,0.00025517298,0.007798042,0.0011689303,0.00021477642,0.00012747126,0.0007046412,0.10450645,0.0024931768,0.4113659,0.002957433,0.46832436],"study_design_scores_gemma":[0.00004725502,0.00044983576,0.011597807,0.001161392,0.00010884998,0.00043186903,0.00086448726,0.3408882,0.0064642676,0.5870998,0.05066009,0.00022620478],"about_ca_topic_score_codex":0.0016361745,"about_ca_topic_score_gemma":0.0011785361,"teacher_disagreement_score":0.017518803,"about_ca_system_score_codex":0.0016705674,"about_ca_system_score_gemma":0.0013645835,"threshold_uncertainty_score":0.0926494},"labels":[],"label_agreement":null},{"id":"W612189707","doi":"","title":"DEVELOPMENT OF ASPHALT OVERLAY PERFORMANCE MODELS FROM THE C-LTPP EXPERIMENT","year":2002,"lang":"en","type":"article","venue":"Ninth International Conference on Asphalt PavementsInternational Society for Asphalt Pavements","topic":"Asphalt Pavement Performance Evaluation","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Subgrade; Overlay; Asphalt; Geotechnical engineering; Asphalt pavement; Environmental science; Surface finish; Rut; Engineering; Civil engineering; Forensic engineering; Computer science; Geography; Cartography; Mechanical engineering","score_opus":0.10060248611154052,"score_gpt":0.3010262463326926,"score_spread":0.20042376022115208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W612189707","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.715867,0.00027485852,0.2406479,0.00019387186,0.000061752726,0.0012097444,0.01258058,0.0025619143,0.02660245],"genre_scores_gemma":[0.9222453,0.00025861748,0.067489915,0.000033324377,0.0000069145694,0.0007929915,0.0053524245,0.00017200912,0.003648469],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997012,0.000045982273,0.000012922559,0.000048674072,0.00014300308,0.00004818483],"domain_scores_gemma":[0.99941635,0.00018196114,0.000044797107,0.000069847854,0.00025461472,0.000032402935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008779253,0.00075853156,0.00045603348,0.0004603386,0.0005114556,0.0005498373,0.001805609,0.0005192425,0.0020314269],"category_scores_gemma":[0.0016574393,0.0002955435,0.000580667,0.0007190045,0.00024473257,0.00051051186,0.00033771628,0.0007554805,0.00059289613],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014712624,0.00027534182,0.0068938374,0.0000989823,0.00004019692,0.00005742402,0.000058118476,0.9456694,0.010188343,0.00205736,0.0015781624,0.032935567],"study_design_scores_gemma":[0.000023674946,0.0000987872,0.0064031025,0.0000073839215,0.00002190715,0.000012565578,0.000027180191,0.98648643,0.004371269,0.00056965335,0.0019551625,0.000022801914],"about_ca_topic_score_codex":0.38424248,"about_ca_topic_score_gemma":0.37754005,"teacher_disagreement_score":0.38424248,"about_ca_system_score_codex":0.003652565,"about_ca_system_score_gemma":0.0026696129,"threshold_uncertainty_score":0.76401186},"labels":[],"label_agreement":null},{"id":"W748766242","doi":"","title":"MODELING FLEXIBLE PAVEMENT PERFORMANCE USING CANADIAN HISTORIC DATA","year":2002,"lang":"en","type":"article","venue":"Ninth International Conference on Asphalt PavementsInternational Society for Asphalt Pavements","topic":"Asphalt Pavement Performance Evaluation","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pavement management; Christian ministry; Transport engineering; Engineering; Range (aeronautics); Judgement; Civil engineering; Process (computing); Computer science; Operations research","score_opus":0.20992998761215878,"score_gpt":0.3311857532575138,"score_spread":0.12125576564535503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W748766242","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9320396,0.000425254,0.033782076,0.00035402164,0.00004647253,0.00018046409,0.022432571,0.0012150633,0.00952448],"genre_scores_gemma":[0.97291666,0.00029203572,0.0130954515,0.000016785907,0.000007797303,0.00007033706,0.011172264,0.00007118763,0.0023574822],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993826,0.000063352614,0.000024359426,0.00014490787,0.00022472341,0.00016006528],"domain_scores_gemma":[0.99893504,0.00021395303,0.00009182806,0.00014151171,0.00054820464,0.00006945004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00117613,0.0009208319,0.00045071365,0.0017265717,0.0010668448,0.0014373768,0.0017487679,0.00053594756,0.0015032938],"category_scores_gemma":[0.003114903,0.0004590564,0.00072713825,0.0031812752,0.0005318502,0.00073195243,0.0004736382,0.0006243578,0.00031542635],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052452993,0.000036140053,0.025632367,0.000041570216,0.00004368357,0.00006392353,0.00007534899,0.9525016,0.00048327705,0.0014206029,0.0011661986,0.018483002],"study_design_scores_gemma":[0.000013327483,0.000023084249,0.033072896,0.000010748151,0.000026971367,0.000018007664,0.00008809379,0.9619622,0.00084085215,0.0006288173,0.0032747048,0.000040252155],"about_ca_topic_score_codex":0.9752848,"about_ca_topic_score_gemma":0.97467065,"teacher_disagreement_score":0.024715185,"about_ca_system_score_codex":0.015134395,"about_ca_system_score_gemma":0.011337754,"threshold_uncertainty_score":0.10980821},"labels":[],"label_agreement":null}]}