{"meta":{"query_hash":"e2018ba2c155","filters":{"venue":"Power System Protection and Control"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/e2018ba2c155","api":"https://metacan.xera.ac/api/v1/cohort?venue=Power+System+Protection+and+Control"},"results":[{"id":"W2356101117","doi":"","title":"An overview of setting method of under voltage load shedding","year":2012,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Smart Grid and Power Systems","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Load Shedding; Scheme (mathematics); Transient (computer programming); Electric power system; Voltage; Key (lock); Power (physics); Computer science; Reliability engineering; Engineering; Control (management); Control theory (sociology); Control engineering; Operations research; Electrical engineering; Mathematics; Computer security","score_opus":0.0205997644724749,"score_gpt":0.26908412988718744,"score_spread":0.24848436541471253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2356101117","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027785806,0.008081725,0.95713556,0.00001379602,0.0037074515,0.00070767093,0.000017617722,0.00023464819,0.002315724],"genre_scores_gemma":[0.9992521,0.000009101124,0.0002621575,0.000012545531,0.00035306922,0.000062486506,5.867564e-7,0.000024118455,0.000023882974],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989463,0.00014887525,0.0003999958,0.00011620378,0.00018143348,0.00020719216],"domain_scores_gemma":[0.9994575,0.000046407327,0.00012695222,0.00020095485,0.00007616095,0.00009201963],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001116661,0.00013921884,0.00035632655,0.000080705955,0.000043027783,0.000016431728,0.00006395981,0.000095822965,0.000021805714],"category_scores_gemma":[0.000014373779,0.00012393502,0.00007058221,0.00012260546,0.000011855987,0.00021085338,0.000008034587,0.000096392214,0.0000055907954],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017281075,0.00016147993,0.016368015,0.011379364,0.00089491386,0.000002421325,0.009365571,0.005691214,0.9137598,0.02056168,0.00046788386,0.021174813],"study_design_scores_gemma":[0.016202543,0.001547028,0.06549627,0.007747194,0.000943285,0.0011588739,0.025764886,0.49114066,0.27392972,0.00010851905,0.11250124,0.003459775],"about_ca_topic_score_codex":0.00010916487,"about_ca_topic_score_gemma":0.000004865291,"teacher_disagreement_score":0.97146624,"about_ca_system_score_codex":0.000059138598,"about_ca_system_score_gemma":0.000011378586,"threshold_uncertainty_score":0.5053924},"labels":[],"label_agreement":null},{"id":"W2389845107","doi":"","title":"Analysis of power emergency drills system at home and abroad and its inspiration for China","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Safety and Risk Management","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Emergency response; Electric power system; Emergency management; Engineering; Electric power industry; Power (physics); Operations management; Business; Medical emergency; Political science; Economic growth; Economics; Law; Electrical engineering; Medicine","score_opus":0.005871104126959902,"score_gpt":0.2066729389197028,"score_spread":0.20080183479274288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2389845107","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97518885,0.000632447,0.017790617,0.00036193436,0.0011705126,0.0021654654,0.000019532665,0.00013636115,0.0025342933],"genre_scores_gemma":[0.9992679,0.0000146803995,0.0000081073695,0.000044759283,0.00014904034,0.00022914162,0.000006170472,0.00001454771,0.00026568916],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.998943,0.00002041505,0.00040028186,0.0003151005,0.00015913592,0.0001620914],"domain_scores_gemma":[0.99927497,0.0000131646675,0.00037444176,0.00015572095,0.00015925732,0.000022425449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005520122,0.00016796855,0.00037313017,0.0004072746,0.00031927798,0.00009140252,0.000058504356,0.000102141814,0.000052329728],"category_scores_gemma":[0.000029982495,0.00013738217,0.0000941386,0.00036325637,0.000021699521,0.00039606882,0.000055306216,0.00007553334,0.0000069827806],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004622186,0.00057562394,0.23929316,0.02674821,0.010273538,0.000016966285,0.0031120433,0.00069055875,0.11855779,0.5615078,0.00090502476,0.03369711],"study_design_scores_gemma":[0.0060250983,0.00019531771,0.6933808,0.00023002981,0.0031660553,0.000014530579,0.00164824,0.26414123,0.0002186668,0.00011236516,0.030078866,0.00078883854],"about_ca_topic_score_codex":0.00023255796,"about_ca_topic_score_gemma":0.00022849345,"teacher_disagreement_score":0.5613954,"about_ca_system_score_codex":0.00002087374,"about_ca_system_score_gemma":0.0000035860176,"threshold_uncertainty_score":0.5602282},"labels":[],"label_agreement":null},{"id":"W2392287197","doi":"","title":"Optimization models for Beijing's generation expansion planning under uncertainties","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Electricity; Beijing; Electricity generation; Reliability (semiconductor); Interval (graph theory); Engineering; Reliability engineering; Electric power system; Electric power; Coal; Electricity market; Environmental economics; Operations research; Power (physics); Computer science; Electrical engineering; Economics; China; Mathematics; Waste management","score_opus":0.020373239193722793,"score_gpt":0.2240979302671355,"score_spread":0.2037246910734127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2392287197","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021161404,0.00030267518,0.9719218,0.0001866521,0.0030303728,0.0008243023,0.0000064648493,0.00025672963,0.0023096155],"genre_scores_gemma":[0.9966266,0.0000032460468,0.0009337758,0.00009146882,0.00058487395,0.0007404612,0.000016650496,0.000039122016,0.0009637988],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987703,0.00009221839,0.00036178084,0.00034954105,0.00017715829,0.00024898275],"domain_scores_gemma":[0.9992911,0.000030347144,0.00018400802,0.00021401835,0.00018851795,0.00009199001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003781647,0.00020017703,0.00026890327,0.00014020344,0.0004182965,0.00015627895,0.00007108852,0.0002445022,0.000019239027],"category_scores_gemma":[0.000024296914,0.00016677947,0.00007976145,0.00009614682,0.000026607939,0.00029431016,0.000013126201,0.00012759659,0.0000024915937],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000862908,0.000016685539,0.000008374291,0.00006283226,0.000051162926,6.8411305e-7,0.00021766285,0.90549725,0.05103797,0.04146278,0.00007383999,0.0014844789],"study_design_scores_gemma":[0.0016318968,0.0001183114,0.000011653023,0.000072487994,0.000029920235,0.000034775807,0.0006731877,0.9882836,0.0019379948,0.00020501057,0.0067707803,0.0002303848],"about_ca_topic_score_codex":0.0010668929,"about_ca_topic_score_gemma":0.00029709178,"teacher_disagreement_score":0.9754652,"about_ca_system_score_codex":0.000054397005,"about_ca_system_score_gemma":0.000038605107,"threshold_uncertainty_score":0.68010694},"labels":[],"label_agreement":null}]}