{"meta":{"query_hash":"e2018ba2c155","filters":{"venue":"Power System Protection and Control"},"cohort_total":3,"direct_labels_cover":0,"predictions_cover":3,"exported":3,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/e2018ba2c155","api":"https://metacan.xera.ac/api/v1/cohort?venue=Power+System+Protection+and+Control"},"results":[{"id":"W2356101117","doi":"","title":"An overview of setting method of under voltage load shedding","year":2012,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Smart Grid and Power Systems","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Load Shedding; Scheme (mathematics); Transient (computer programming); Electric power system; Voltage; Key (lock); Power (physics); Computer science; Reliability engineering; Engineering; Control (management); Control theory (sociology); Control engineering; Operations research; Electrical engineering; Mathematics; Computer security","score_opus":0.0205997644724749,"score_gpt":0.26908412988718744,"score_spread":0.24848436541471253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2356101117","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012125112,0.001037638,0.99261594,0.0000758743,0.00007933576,0.000092310605,0.00002185342,0.00023395345,0.004630525],"genre_scores_gemma":[0.24460548,0.0042871255,0.7393205,0.0002182229,0.00038680545,0.00060336303,0.00015684882,0.00019491579,0.010226732],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982722,0.00054891664,0.00017065827,0.00036012926,0.0005761771,0.000071872804],"domain_scores_gemma":[0.9994165,0.00018976552,0.0000716088,0.0001235913,0.00017204256,0.000026539741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001263374,0.00080508564,0.00059446774,0.0010283265,0.0006547266,0.0009570286,0.0011149225,0.0006571556,0.005175169],"category_scores_gemma":[0.0015509193,0.0004215701,0.00071500044,0.00095640006,0.00071127206,0.0014875047,0.001008296,0.00091546675,0.0010039433],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001807287,0.00009959555,0.0009014414,0.0009356957,0.000052092615,0.00016968745,0.0005068377,0.04801584,0.026458679,0.14617787,0.006330171,0.77017146],"study_design_scores_gemma":[0.00013489297,0.00078493025,0.0015056115,0.00027505885,0.00009419373,0.0013583031,0.00025614953,0.6837603,0.035894204,0.12210178,0.15364982,0.00018471385],"about_ca_topic_score_codex":0.00063419767,"about_ca_topic_score_gemma":0.00052213494,"teacher_disagreement_score":0.005175169,"about_ca_system_score_codex":0.0005905669,"about_ca_system_score_gemma":0.00060492987,"threshold_uncertainty_score":0.017312706},"labels":[],"label_agreement":null},{"id":"W2389845107","doi":"","title":"Analysis of power emergency drills system at home and abroad and its inspiration for China","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Safety and Risk Management","field":"Business, Management and Accounting","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Emergency response; Electric power system; Emergency management; Engineering; Electric power industry; Power (physics); Operations management; Business; Medical emergency; Political science; Economic growth; Economics; Law; Electrical engineering; Medicine","score_opus":0.005871104126959902,"score_gpt":0.2066729389197028,"score_spread":0.20080183479274288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2389845107","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9911636,0.00008015158,0.0008926547,0.00015318068,0.0000061571236,0.000022700258,0.00037801164,0.000024089772,0.007279444],"genre_scores_gemma":[0.99753726,0.000098567,0.00023142547,0.000012613999,0.0000048964416,0.0000073224783,0.00041707465,0.0000047565554,0.0016861107],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996878,0.0000376236,0.00001978367,0.00004084221,0.000107648506,0.000106370426],"domain_scores_gemma":[0.9995333,0.00006256427,0.00012395196,0.000022924476,0.00015908675,0.00009825701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003039942,0.00019835132,0.00021904489,0.002332913,0.0005596645,0.0008023022,0.00030947337,0.00023785878,0.0024440608],"category_scores_gemma":[0.0008243423,0.00013244727,0.00039758475,0.0020911014,0.00036801785,0.00066500576,0.0005688448,0.00029370503,0.00014248457],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004647876,0.00016647652,0.8610898,0.000253865,0.00012409297,0.0036272528,0.0056865835,0.022457464,0.0050151744,0.018412968,0.0067318813,0.075969614],"study_design_scores_gemma":[0.000008561548,0.00008385227,0.97636443,0.000021272059,0.000040079805,0.00024314814,0.004573446,0.014034494,0.00075399707,0.0007966079,0.0030547937,0.00002520861],"about_ca_topic_score_codex":0.048238304,"about_ca_topic_score_gemma":0.04644786,"teacher_disagreement_score":0.048238304,"about_ca_system_score_codex":0.0014515609,"about_ca_system_score_gemma":0.0009200523,"threshold_uncertainty_score":0.09591508},"labels":[],"label_agreement":null},{"id":"W2392287197","doi":"","title":"Optimization models for Beijing's generation expansion planning under uncertainties","year":2010,"lang":"en","type":"article","venue":"Power System Protection and Control","topic":"Power Systems and Renewable Energy","field":"Energy","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Electricity; Beijing; Electricity generation; Reliability (semiconductor); Interval (graph theory); Engineering; Reliability engineering; Electric power system; Electric power; Coal; Electricity market; Environmental economics; Operations research; Power (physics); Computer science; Electrical engineering; Economics; China; Mathematics; Waste management","score_opus":0.020373239193722793,"score_gpt":0.2240979302671355,"score_spread":0.2037246910734127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2392287197","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13987711,0.0017373203,0.82347417,0.001284953,0.0000976524,0.00009756704,0.00084438646,0.00035980044,0.03222697],"genre_scores_gemma":[0.975658,0.0006648565,0.014931686,0.000055972836,0.000026656928,0.00017163677,0.00029467288,0.00005764979,0.00813883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996307,0.00014622617,0.000016130432,0.00006959551,0.00007197542,0.00006546146],"domain_scores_gemma":[0.99963593,0.00021684705,0.000058230158,0.000011541052,0.000058136662,0.000019231555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083635293,0.00095140684,0.00093150017,0.00048933254,0.0004528873,0.0012276232,0.00083203625,0.0011144993,0.0027652003],"category_scores_gemma":[0.0011353332,0.0005716455,0.00081018195,0.0007069386,0.00063495216,0.00089602784,0.0007749866,0.0009785215,0.00023018147],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004475581,0.0000016157609,0.00006107407,0.000004876794,0.000004320995,0.000012320715,0.0000059676095,0.9975495,0.00004117403,0.0015850135,0.00008401512,0.00064569607],"study_design_scores_gemma":[0.000002250698,0.0000031803618,0.00005849037,0.0000013961394,0.0000024741037,0.0000022823378,0.000004123866,0.99866235,0.000022948121,0.0010925486,0.00014603967,0.0000019403687],"about_ca_topic_score_codex":0.02981661,"about_ca_topic_score_gemma":0.015762413,"teacher_disagreement_score":0.02981661,"about_ca_system_score_codex":0.0018408736,"about_ca_system_score_gemma":0.0014892699,"threshold_uncertainty_score":0.059286118},"labels":[],"label_agreement":null}]}