{"meta":{"query_hash":"c2d97dac49e3","filters":{"venue":"Prestress Technology"},"cohort_total":2,"direct_labels_cover":0,"predictions_cover":2,"exported":2,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/c2d97dac49e3","api":"https://metacan.xera.ac/api/v1/cohort?venue=Prestress+Technology"},"results":[{"id":"W4385679240","doi":"10.59238/j.pt.2015.05.003","title":"Experimental study on moment redistribution of external prestressed concrete continuous beams","year":2015,"lang":"en","type":"article","venue":"Prestress Technology","topic":"Structural Behavior of Reinforced Concrete","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Structural engineering; Bending moment; Prestressed concrete; Span (engineering); Beam (structure); Neutral axis; Moment (physics); Beijing; Ultimate load; Tension (geology); Materials science; Ultimate tensile strength; Engineering; Physics; Finite element method; Composite material; Law; Classical mechanics","score_opus":0.017390126616723556,"score_gpt":0.26308876083392335,"score_spread":0.24569863421719979,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385679240","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99830127,0.000027949212,0.0012757212,0.0000035328367,0.0000026218408,0.000008473113,0.00006023446,0.000026960053,0.00029318067],"genre_scores_gemma":[0.99849653,0.000023864019,0.00088040845,0.0000045757433,0.0000022203349,0.000011121936,0.00006166547,0.0000059036843,0.0005136283],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99956065,0.00004521392,0.000022027018,0.00010696427,0.00018592576,0.00007925761],"domain_scores_gemma":[0.99930215,0.00019919677,0.00010990917,0.00011383994,0.00020248268,0.00007233608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052852853,0.00054454483,0.00032794612,0.0004025328,0.00031661283,0.0001353245,0.000563911,0.00045042954,0.0022433044],"category_scores_gemma":[0.0005293273,0.00026427463,0.00025895424,0.00031684054,0.00045115146,0.0002848958,0.00033565285,0.00026656783,0.00026735992],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069507386,0.00014916313,0.003039353,0.00008739994,0.000013480012,0.00012721297,0.00021751966,0.0019569183,0.9893008,0.000045763274,0.000036689715,0.004330708],"study_design_scores_gemma":[0.000080572434,0.005136057,0.055722933,0.000015693604,0.00005131043,0.00015294847,0.0002364493,0.009274839,0.92864794,0.00004912652,0.00059442694,0.00003762869],"about_ca_topic_score_codex":0.0007610371,"about_ca_topic_score_gemma":0.00108334,"teacher_disagreement_score":0.0022433044,"about_ca_system_score_codex":0.00017277095,"about_ca_system_score_gemma":0.00012942728,"threshold_uncertainty_score":0.007504642},"labels":[],"label_agreement":null},{"id":"W4385780965","doi":"10.59238/j.pt.2001.05x.010","title":"Prestressed Construction of Toronto Telecommunications Tower","year":2001,"lang":"en","type":"article","venue":"Prestress Technology","topic":"Structural Engineering and Vibration Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tower; Telecommunications; Engineering; Architectural engineering; Civil engineering","score_opus":0.005483327679776755,"score_gpt":0.21591958298139777,"score_spread":0.21043625530162102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385780965","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89040077,0.00021616326,0.0020090176,0.00047353873,0.00004254364,0.00006882727,0.0012129229,0.00009117931,0.10548507],"genre_scores_gemma":[0.9691812,0.00013255955,0.00097630935,0.000013904415,0.00000560632,0.0000093465005,0.0004060419,0.00001444251,0.029260537],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995426,0.00004392883,0.000009510356,0.000055069366,0.00023705524,0.000111957954],"domain_scores_gemma":[0.99951935,0.000038032525,0.000043078824,0.000037132693,0.00022162701,0.0001406854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016593037,0.00025893893,0.000112074435,0.0008166428,0.0039582034,0.001192618,0.00046510002,0.0004798586,0.015316967],"category_scores_gemma":[0.0007374152,0.0002636784,0.00016406072,0.0009229735,0.0009769514,0.00027898184,0.0007036328,0.00062740006,0.0012322834],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015279492,0.0003351752,0.33394974,0.000426435,0.00009656733,0.013986683,0.021751681,0.17118931,0.08385734,0.07123572,0.051391233,0.25025213],"study_design_scores_gemma":[0.000034409837,0.00041689642,0.86259025,0.000105423205,0.00002950283,0.0005136822,0.013061318,0.02171037,0.008097166,0.0011662322,0.09220999,0.00006477843],"about_ca_topic_score_codex":0.8248562,"about_ca_topic_score_gemma":0.9561005,"teacher_disagreement_score":0.17514378,"about_ca_system_score_codex":0.018054895,"about_ca_system_score_gemma":0.0144261625,"threshold_uncertainty_score":0.3523504},"labels":[],"label_agreement":null}]}