{"meta":{"query_hash":"4802ddd5e3f0","filters":{"venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law"},"cohort_total":9,"direct_labels_cover":0,"predictions_cover":9,"exported":9,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/4802ddd5e3f0","api":"https://metacan.xera.ac/api/v1/cohort?venue=Proceedings+of+the+Institution+of+Civil+Engineers+-+Management+Procurement+and+Law"},"results":[{"id":"W1994119669","doi":"10.1680/mpal.12.00009","title":"The chronographical approach for construction project modelling","year":2013,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Planner; Graphics; Schedule; Set (abstract data type); Scheduling (production processes); Statistical graphics; Representation (politics); Human–computer interaction; Artificial intelligence; Programming language; Engineering; Computer graphics (images)","score_opus":0.010420659588965583,"score_gpt":0.1831383901782016,"score_spread":0.172717730589236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994119669","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007932652,0.00086831907,0.97212505,0.0003817295,0.00024350622,0.00017493726,0.00068765326,0.0006533017,0.024072211],"genre_scores_gemma":[0.045167275,0.0032519987,0.92891204,0.0002661041,0.000215166,0.0010434579,0.0020917885,0.00046586705,0.018586216],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975891,0.0011920342,0.00027721561,0.0003346152,0.00049957086,0.00010747212],"domain_scores_gemma":[0.9981475,0.00077866745,0.00018065824,0.00032574442,0.0004894109,0.00007812597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023360793,0.0012888109,0.00059840205,0.003629068,0.0010541776,0.0046406277,0.0021876863,0.0011875712,0.018662628],"category_scores_gemma":[0.00648996,0.000530163,0.0018940333,0.0057011507,0.0019497604,0.0039358037,0.0017832308,0.0018724308,0.0058580553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004305163,0.000020188327,0.0004208891,0.00033748124,0.000022647791,0.00025532136,0.00092960097,0.025727505,0.0008556048,0.8933542,0.011044904,0.06698867],"study_design_scores_gemma":[0.000023773311,0.000045086294,0.00032954031,0.00041018586,0.000033525615,0.000508384,0.0006620421,0.06331788,0.0009763422,0.27930564,0.6543198,0.000067674795],"about_ca_topic_score_codex":0.010870212,"about_ca_topic_score_gemma":0.012486653,"teacher_disagreement_score":0.018662628,"about_ca_system_score_codex":0.0022415451,"about_ca_system_score_gemma":0.0026943947,"threshold_uncertainty_score":0.062432706},"labels":[],"label_agreement":null},{"id":"W2062801531","doi":"10.1680/mpal.11.00049","title":"Simulation of scheduling logic using dynamic functions","year":2013,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Critical path method; Probabilistic logic; Interdependence; Scheduling (production processes); Schedule; Dynamic priority scheduling; Function (biology); Mathematical optimization; Distributed computing; Systems engineering; Engineering; Artificial intelligence; Mathematics","score_opus":0.011204330017663227,"score_gpt":0.20484038485609066,"score_spread":0.19363605483842744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062801531","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2879903,0.00008510307,0.6970624,0.00014810622,0.000052258056,0.00012642128,0.0004165778,0.0011147093,0.013004228],"genre_scores_gemma":[0.9140495,0.00008720322,0.08287553,0.000027177766,0.0000075479365,0.00018579295,0.00022728815,0.000081420985,0.0024584979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945563,0.00020324533,0.00003314274,0.0000805707,0.00013006224,0.00009732604],"domain_scores_gemma":[0.99805754,0.0013660281,0.00012649722,0.0001482878,0.00024214857,0.000059527767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089245394,0.0005754854,0.00035288712,0.0007226022,0.000382845,0.0008874138,0.00090155925,0.000590836,0.0032864362],"category_scores_gemma":[0.002657751,0.00029143866,0.0005620637,0.00049168227,0.00069971016,0.0007203305,0.00053788227,0.0005825587,0.0002092018],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047806683,0.000021477319,0.00047013766,0.000014036961,0.0000051388643,0.000023192219,0.000038982824,0.9881613,0.0010876638,0.007408781,0.00007031766,0.0026511555],"study_design_scores_gemma":[0.000005157724,0.000013624127,0.000050776373,0.0000016546297,0.0000021311394,0.0000040773803,0.000006107555,0.9978369,0.00072999985,0.0010847204,0.0002627235,0.0000020955993],"about_ca_topic_score_codex":0.007884036,"about_ca_topic_score_gemma":0.0038210968,"teacher_disagreement_score":0.007884036,"about_ca_system_score_codex":0.0011605778,"about_ca_system_score_gemma":0.0011570139,"threshold_uncertainty_score":0.01567626},"labels":[],"label_agreement":null},{"id":"W2069890660","doi":"10.1680/mpal.13.00002","title":"Virtual collaborative learning for building design","year":2014,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Teamwork; Ethos; Process (computing); Psychology; Team building; Knowledge management; Medical education; Engineering; Mathematics education; Computer science; Engineering management; Political science; Medicine","score_opus":0.0299618637691476,"score_gpt":0.277796356607131,"score_spread":0.24783449283798337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2069890660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04422252,0.019288285,0.5037781,0.0049697026,0.0015995068,0.0008528515,0.00045145128,0.0037824127,0.42105517],"genre_scores_gemma":[0.4158855,0.008610277,0.47964752,0.0009285983,0.0006949934,0.0018513955,0.00085803046,0.00041120016,0.09111254],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.998343,0.0010042198,0.000052948115,0.00013331838,0.0003767663,0.00008968319],"domain_scores_gemma":[0.9969524,0.001907234,0.00008387241,0.00053800165,0.00020573243,0.00031267077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024277386,0.0006645806,0.0004223168,0.001191465,0.0012031822,0.004825969,0.0014983945,0.0013056458,0.024740512],"category_scores_gemma":[0.0060358336,0.00017134332,0.0005073657,0.0013942178,0.0011503006,0.0025538332,0.0035036735,0.0010840017,0.0033800818],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017941503,0.00042154716,0.00068397174,0.0007937193,0.00004355729,0.00019976654,0.0023183448,0.006234411,0.0025164734,0.11924301,0.043606725,0.823759],"study_design_scores_gemma":[0.00020017248,0.0005508033,0.0027660155,0.0009658269,0.000065573935,0.00089644705,0.001887295,0.029222371,0.0023918825,0.23785545,0.7230959,0.00010233661],"about_ca_topic_score_codex":0.0014118219,"about_ca_topic_score_gemma":0.0031411976,"teacher_disagreement_score":0.024740512,"about_ca_system_score_codex":0.0012168782,"about_ca_system_score_gemma":0.0013177628,"threshold_uncertainty_score":0.08276528},"labels":[],"label_agreement":null},{"id":"W2162959305","doi":"10.1680/mpal.10.00041","title":"Public–private partnerships: critical factors for procurement of capital projects","year":2012,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Public-Private Partnership Projects","field":"Business, Management and Accounting","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University Canada West","funders":"","keywords":"Procurement; Business; Scope (computer science); Capital (architecture); Finance; Critical success factor; Private sector; Marketing; Economics; Economic growth","score_opus":0.08163292920489726,"score_gpt":0.2550562746866035,"score_spread":0.17342334548170626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162959305","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8083529,0.0014352122,0.03645614,0.00944788,0.00007070387,0.0022699726,0.00021331833,0.00011691043,0.14163688],"genre_scores_gemma":[0.9946095,0.00031009255,0.0034653503,0.000064021246,0.000011059807,0.00015181754,0.000032856617,0.000011860236,0.0013434725],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9803508,0.009265867,0.0012413049,0.0006086041,0.0053764656,0.0031568503],"domain_scores_gemma":[0.87612313,0.0795724,0.014823295,0.0021228956,0.015843762,0.01151464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017826384,0.0007238356,0.00045934442,0.004056709,0.0067127883,0.011098679,0.0007149844,0.0017116617,0.008438302],"category_scores_gemma":[0.062286433,0.0007384644,0.0005381351,0.00482019,0.0050608627,0.007839053,0.0036384529,0.002269095,0.0007935094],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005570096,0.0010399469,0.37502632,0.0016674423,0.00015787147,0.005760683,0.0682092,0.014698254,0.0024930476,0.33831894,0.009655525,0.18241575],"study_design_scores_gemma":[0.00014625485,0.0012734773,0.3088647,0.002400766,0.00026059372,0.003983935,0.3747831,0.034201413,0.005221382,0.17553441,0.09296787,0.00036211766],"about_ca_topic_score_codex":0.0104392525,"about_ca_topic_score_gemma":0.010571715,"teacher_disagreement_score":0.017826384,"about_ca_system_score_codex":0.009764419,"about_ca_system_score_gemma":0.02001912,"threshold_uncertainty_score":0.09427601},"labels":[],"label_agreement":null},{"id":"W2284526201","doi":"10.1680/jmapl.15.00039","title":"A chronographic protocol for modelling construction projects","year":2016,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Data Visualization and Analytics","field":"Computer Science","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Protocol (science); Graphics; Visualization; Process (computing); Schedule; Planner; Set (abstract data type); Scheduling (production processes); Table (database); Statistical graphics; Computer graphics; Human–computer interaction; Data mining; Software engineering; Information retrieval; Artificial intelligence; Programming language; Computer graphics (images); Engineering","score_opus":0.027383433100267446,"score_gpt":0.25586008109972197,"score_spread":0.22847664799945452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2284526201","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005111076,0.00052165444,0.7864274,0.002391792,0.0010111711,0.029972648,0.047044314,0.0047535286,0.122766405],"genre_scores_gemma":[0.032907903,0.0012823448,0.8300476,0.0005961891,0.00013599431,0.060689274,0.031850494,0.001160181,0.041330066],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98598146,0.0076750894,0.0029856956,0.0009031562,0.0020398041,0.0004148724],"domain_scores_gemma":[0.96116126,0.016542658,0.0019854514,0.010041729,0.009525992,0.0007429229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016657297,0.0014434089,0.00065799255,0.0050790827,0.0027746244,0.0064008483,0.0030861394,0.0027433985,0.09937392],"category_scores_gemma":[0.048490062,0.0013297652,0.0011111657,0.008239214,0.0023273206,0.007019529,0.0037117836,0.0030193096,0.027858729],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009265335,0.00032267,0.0015036276,0.0022661604,0.000035184556,0.0007439789,0.011500677,0.017805832,0.004010345,0.6119349,0.18444134,0.1645087],"study_design_scores_gemma":[0.00010441842,0.00010327663,0.00049903494,0.0008006351,0.000015675605,0.0001356042,0.0021102084,0.0048901234,0.0015230748,0.035006985,0.95472944,0.00008150671],"about_ca_topic_score_codex":0.013684123,"about_ca_topic_score_gemma":0.014572043,"teacher_disagreement_score":0.09937392,"about_ca_system_score_codex":0.0048643923,"about_ca_system_score_gemma":0.014254994,"threshold_uncertainty_score":0.3324389},"labels":[],"label_agreement":null},{"id":"W2437854040","doi":"10.1680/mpal.14.00023","title":"Adoption of knowledge management by Canadian housing charities","year":2015,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Construction Project Management and Performance","field":"Decision Sciences","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Knowledge management; Business; Work (physics); Profit (economics); Information technology; Engineering; Computer science; Economics","score_opus":0.043928155625057884,"score_gpt":0.2685572723084066,"score_spread":0.2246291166833487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2437854040","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98203284,0.00021519986,0.00044624484,0.0020386511,0.0000097044485,0.00009568872,0.00004258997,0.000016437303,0.015102676],"genre_scores_gemma":[0.9971501,0.00022830824,0.00073905056,0.00012880165,0.0000031975933,0.000021859692,0.0000298475,0.00000421832,0.0016946207],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98605967,0.0055572353,0.00046646298,0.00080995593,0.0043414664,0.0027652152],"domain_scores_gemma":[0.9666163,0.013917468,0.004497425,0.002196505,0.007899534,0.0048727687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01359817,0.00030599383,0.000295435,0.002842511,0.009230905,0.0071066734,0.0016153374,0.0010016579,0.0020310644],"category_scores_gemma":[0.03084208,0.00033961845,0.00035462633,0.0026030575,0.004256593,0.0020240934,0.0050540627,0.0013817442,0.00014973099],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038083855,0.00069610076,0.27156413,0.0006035426,0.00007054456,0.0016098093,0.42800426,0.0010058866,0.003570522,0.008782046,0.004029504,0.27968273],"study_design_scores_gemma":[0.000047229496,0.0005217939,0.3396904,0.0007206647,0.00007464547,0.0005037707,0.59038293,0.0026343956,0.001774117,0.0017498113,0.061702363,0.00019792904],"about_ca_topic_score_codex":0.7616985,"about_ca_topic_score_gemma":0.8507321,"teacher_disagreement_score":0.23830152,"about_ca_system_score_codex":0.040196568,"about_ca_system_score_gemma":0.06259254,"threshold_uncertainty_score":0.4794098},"labels":[],"label_agreement":null},{"id":"W3126322249","doi":"10.1680/jmapl.20.00051","title":"Productivity and industrial relations in the Australian construction industry","year":2021,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Labor Movements and Unions","field":"Social Sciences","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Construction industry; Business; Legislation; Industrial relations; Industrial organization; Work (physics); Engineering; Economics; Political science; Management; Economic growth; Construction engineering; Law","score_opus":0.023214151044801914,"score_gpt":0.24608962226043993,"score_spread":0.222875471215638,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3126322249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.973256,0.00053243147,0.00014424202,0.0018712217,0.0000126492805,0.0000064761466,0.000011599365,0.0000029103164,0.024162605],"genre_scores_gemma":[0.9970091,0.00033347006,0.00004329568,0.000067352994,0.0000075125336,0.0000034305913,0.000005759796,0.0000015074066,0.0025286383],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9969348,0.0013123611,0.00008580878,0.00014229368,0.0008729588,0.0006518989],"domain_scores_gemma":[0.994584,0.0015258709,0.001671829,0.00014562841,0.00078653864,0.0012860135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026046701,0.00011187988,0.00017908601,0.0019931442,0.004859995,0.00377214,0.0005706985,0.00056800444,0.0050247386],"category_scores_gemma":[0.008029993,0.00016695625,0.00012563031,0.0027585758,0.00446237,0.0013040358,0.0035333098,0.0011496153,0.0005151898],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012072069,0.00034134163,0.46941113,0.00016978444,0.00003299593,0.00093202613,0.39024737,0.0007784422,0.0010632102,0.036093958,0.0032202592,0.09758878],"study_design_scores_gemma":[0.000004831211,0.000097247765,0.82657737,0.00009987135,0.00000796084,0.00011692892,0.15055998,0.00056676345,0.00008319296,0.0025893494,0.019279737,0.000016818674],"about_ca_topic_score_codex":0.09285703,"about_ca_topic_score_gemma":0.1195027,"teacher_disagreement_score":0.09285703,"about_ca_system_score_codex":0.008062666,"about_ca_system_score_gemma":0.0035813998,"threshold_uncertainty_score":0.18463308},"labels":[],"label_agreement":null},{"id":"W3217272345","doi":"10.1680/jmapl.21.00019","title":"Diffusion of platform thinking as an innovation in the construction supply chain","year":2021,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Quality and Supply Management","field":"Business, Management and Accounting","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Trent University; Nottingham Trent University","keywords":"Supply chain; Product (mathematics); Systems thinking; Adversarial system; Knowledge management; Supply chain management; Relation (database); Computer science; Criticism; Focus (optics); Data science; Business; Process management; Marketing; Political science; Artificial intelligence; Database","score_opus":0.01467515410365828,"score_gpt":0.21458930099076398,"score_spread":0.1999141468871057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217272345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47078198,0.12677911,0.039658144,0.026845086,0.0008447197,0.0002890373,0.00014736656,0.000103273014,0.3345512],"genre_scores_gemma":[0.9567249,0.032148797,0.006392789,0.00075062894,0.0001673038,0.00006528702,0.000040946536,0.00001941892,0.0036899764],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9937232,0.003251389,0.0003345947,0.00047228183,0.0018346423,0.00038390126],"domain_scores_gemma":[0.979251,0.01600525,0.0018737016,0.00052819215,0.0019884238,0.0003533755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0088098515,0.00028928855,0.00028890983,0.0085186865,0.0019030292,0.012787334,0.0006203602,0.002081531,0.002004737],"category_scores_gemma":[0.013028362,0.00026670485,0.00043780077,0.010315268,0.0074507245,0.011941075,0.0029763922,0.0015535576,0.0002358885],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012141342,0.00006985564,0.016513228,0.0040085963,0.000100701924,0.0021065697,0.06873211,0.0027860326,0.0021637564,0.6156679,0.0036735728,0.2840562],"study_design_scores_gemma":[0.000057080877,0.00038584953,0.049155075,0.014699594,0.00026405588,0.0027990623,0.12074831,0.0067585963,0.0053856075,0.41598183,0.38350922,0.00025567826],"about_ca_topic_score_codex":0.0023751708,"about_ca_topic_score_gemma":0.0034340478,"teacher_disagreement_score":0.012787334,"about_ca_system_score_codex":0.0058928924,"about_ca_system_score_gemma":0.005159491,"threshold_uncertainty_score":0.04659152},"labels":[],"label_agreement":null},{"id":"W4232600953","doi":"10.1680/mpal.2014.167.5.207","title":"Editorial","year":2014,"lang":"en","type":"editorial","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"Complex Systems and Decision Making","field":"Decision Sciences","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Philosophy","score_opus":0.026677763263159175,"score_gpt":0.2916332799297196,"score_spread":0.2649555166665604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232600953","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00002534781,0.0026231473,0.00008206397,0.017862305,0.97333944,0.000024967398,0.000070607275,0.00004463566,0.005927487],"genre_scores_gemma":[0.0005560483,0.0032687895,0.00015082942,0.014674526,0.9348581,0.00004635276,0.00009646401,0.00006361888,0.046285238],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99334854,0.00092705066,0.0006781264,0.0008186602,0.0037387016,0.00048882246],"domain_scores_gemma":[0.9726567,0.006167423,0.0016785424,0.0012914228,0.0146420775,0.0035637913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056736544,0.0026745205,0.0035426668,0.0053643365,0.003853207,0.009598073,0.0031676183,0.010551221,0.049130686],"category_scores_gemma":[0.036557976,0.0009420333,0.0020456978,0.002218658,0.0023009847,0.0037388466,0.0019255483,0.011355829,0.03665698],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009211198,0.00000664879,0.000009023805,0.000056313656,0.0000048897446,0.00004407196,0.000004294993,0.000010172712,0.000014772299,0.00015456535,0.9962669,0.0034191324],"study_design_scores_gemma":[0.000022877934,0.000007797154,0.00009596083,0.00020143519,0.000016690989,0.000079730395,0.000018732177,0.000043409847,0.00005258902,0.0005594107,0.9988938,0.000007661935],"about_ca_topic_score_codex":0.0024182391,"about_ca_topic_score_gemma":0.005086242,"teacher_disagreement_score":0.049130686,"about_ca_system_score_codex":0.003322709,"about_ca_system_score_gemma":0.0048294165,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null}]}