{"meta":{"query_hash":"cf0690b73b6c","filters":{"venue":"REM - International Engineering Journal"},"cohort_total":6,"direct_labels_cover":0,"predictions_cover":6,"exported":6,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/cf0690b73b6c","api":"https://metacan.xera.ac/api/v1/cohort?venue=REM+-+International+Engineering+Journal"},"results":[{"id":"W2572378363","doi":"10.1590/0370-44672016700089","title":"Revisiting the risk concept in Geotechnics: qualitative and quantitative methods","year":2017,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ArcelorMittal (Canada)","funders":"","keywords":"Geotechnics; Computer science; Geology; Geotechnical engineering","score_opus":0.01878638913233485,"score_gpt":0.3698378951676363,"score_spread":0.3510515060353015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2572378363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007173307,0.008802361,0.9416613,0.00997875,0.00058529404,0.00032739766,0.0001718816,0.00011624947,0.031183437],"genre_scores_gemma":[0.3995851,0.013405635,0.57476854,0.0026583497,0.0006788577,0.0017790899,0.00014792777,0.00018436403,0.006792171],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9618535,0.027870849,0.0015206673,0.0013152162,0.0069864327,0.00045331963],"domain_scores_gemma":[0.91736346,0.07065501,0.0035172754,0.003015442,0.0049358094,0.0005130073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.043090545,0.001533033,0.0011591479,0.008011648,0.0020809756,0.0113674635,0.0027020217,0.0022094722,0.0036533822],"category_scores_gemma":[0.042703014,0.0006138471,0.0011036226,0.0064091147,0.031483863,0.015974773,0.0059480146,0.0048557813,0.0005510324],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008347725,0.00002698055,0.0005109533,0.000468054,0.000018269435,0.000047160665,0.0043014954,0.00315791,0.00023283556,0.96776104,0.0007262984,0.022740627],"study_design_scores_gemma":[0.000010045334,0.000043809236,0.00052303314,0.00083131314,0.000017576791,0.00008997802,0.0056352797,0.00728285,0.00046124554,0.9505153,0.034538794,0.00005077755],"about_ca_topic_score_codex":0.0036541878,"about_ca_topic_score_gemma":0.0029267012,"teacher_disagreement_score":0.043090545,"about_ca_system_score_codex":0.009036239,"about_ca_system_score_gemma":0.008184871,"threshold_uncertainty_score":0.22788727},"labels":[],"label_agreement":null},{"id":"W2608478472","doi":"10.1590/0370-44672016700043","title":"A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects","year":2017,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Process (computing); Production (economics); Stage (stratigraphy); Engineering; Project team; Product (mathematics); Work (physics); Industrial engineering; Computer science; Operations research; Systems engineering; Manufacturing engineering; Mechanical engineering","score_opus":0.02826928401001946,"score_gpt":0.2580681108140243,"score_spread":0.22979882680400485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2608478472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07551681,0.00005241303,0.9159235,0.00009066539,0.000012933802,0.00018277431,0.00020685756,0.00029706268,0.0077169607],"genre_scores_gemma":[0.8000053,0.00016200777,0.19609553,0.00004086576,0.000013020117,0.000523401,0.00026892268,0.00007034267,0.0028205134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993906,0.00023225357,0.000031262745,0.00011400994,0.00017286075,0.00005898181],"domain_scores_gemma":[0.9991615,0.00052517676,0.000098541896,0.000061947285,0.00011703278,0.00003578057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008120613,0.000741123,0.000623566,0.0011829028,0.0005955041,0.0015515981,0.00084166334,0.0008793117,0.0021346249],"category_scores_gemma":[0.0019057193,0.0005520428,0.0009490141,0.00093751337,0.00048171607,0.0013299823,0.0009241227,0.0008318959,0.0002544282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049641883,0.000091300004,0.002894927,0.00006501289,0.000043791348,0.00007742702,0.00014072574,0.96927714,0.004309611,0.010845299,0.00018096047,0.012024181],"study_design_scores_gemma":[0.0000057215884,0.00004046369,0.0008890572,0.000005964315,0.000009582606,0.000015720443,0.000052113966,0.995621,0.00058391347,0.002202179,0.0005640802,0.000010195225],"about_ca_topic_score_codex":0.008249351,"about_ca_topic_score_gemma":0.0059208754,"teacher_disagreement_score":0.008249351,"about_ca_system_score_codex":0.0010327642,"about_ca_system_score_gemma":0.0014357372,"threshold_uncertainty_score":0.016402662},"labels":[],"label_agreement":null},{"id":"W2996125425","doi":"10.1590/0370-44672019730038","title":"Geochemical assessment of platinum group metals for phytomining","year":2019,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Heavy metals in environment","field":"Environmental Science","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Tailings; Platinum group; Chemistry; Extraction (chemistry); Ammonium acetate; Ammonium oxalate; Environmental chemistry; Soil water; Phytoremediation; Palladium; Platinum; Nuclear chemistry; Inorganic chemistry; Geology; Heavy metals; Catalysis; Chromatography; Soil science; High-performance liquid chromatography","score_opus":0.007578270708524166,"score_gpt":0.25652873666393383,"score_spread":0.24895046595540968,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2996125425","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9936761,0.00076372514,0.0035882762,0.0000217575,0.0000074530385,0.000039678467,0.00029732354,0.00002891056,0.0015767275],"genre_scores_gemma":[0.9930101,0.0005787112,0.004303345,0.000023998502,0.0000025688569,0.000019578565,0.00037389627,0.000011289224,0.0016764716],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9998934,0.000018266319,0.000006810474,0.00002567091,0.00004083854,0.000014934206],"domain_scores_gemma":[0.999913,0.00002396369,0.000015138608,0.000005917418,0.000030988736,0.000010992051],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000121573765,0.0002667107,0.0001861702,0.0004065202,0.00020685139,0.00022072546,0.00016007289,0.0002403425,0.00046278685],"category_scores_gemma":[0.00014062782,0.00013679286,0.00014725319,0.000270233,0.00015645158,0.00014129504,0.00020082275,0.00022522493,0.0001531474],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031394004,0.0000043865707,0.00088188093,0.000046296638,0.0000033859217,0.000028001816,0.000022588994,0.000033038,0.9974636,0.000011585125,0.0000069516423,0.0014670035],"study_design_scores_gemma":[0.000002464825,0.00026492053,0.018658737,0.000008685697,0.0000188375,0.00012452388,0.0000957075,0.00035785287,0.97898614,0.000029772595,0.0014476514,0.000004844795],"about_ca_topic_score_codex":0.0021727218,"about_ca_topic_score_gemma":0.0090730935,"teacher_disagreement_score":0.0021727218,"about_ca_system_score_codex":0.00019493689,"about_ca_system_score_gemma":0.00014448233,"threshold_uncertainty_score":0.0043201447},"labels":[],"label_agreement":null},{"id":"W3090806210","doi":"10.1590/0370-44672019730057","title":"Strategies used to control the costs of underground ventilation in some Brazilian mines","year":2020,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Industrial Automation and Control Systems","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ventilation (architecture); Environmental science; Consumption (sociology); Energy consumption; Control (management); Flow (mathematics); Mining engineering; Engineering; Computer science; Electrical engineering; Mechanical engineering; Mathematics","score_opus":0.015560590773655647,"score_gpt":0.2276819336463369,"score_spread":0.21212134287268125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3090806210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91203254,0.0032718575,0.031239284,0.001811404,0.00007156473,0.00038178128,0.00017050565,0.00019882545,0.05082226],"genre_scores_gemma":[0.98340315,0.00096047315,0.011383705,0.00008198058,0.000011630867,0.000059709462,0.00005458355,0.00001795981,0.0040268158],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99959534,0.00009376922,0.000030214896,0.00004601043,0.00015552636,0.00007906807],"domain_scores_gemma":[0.99939334,0.00012278896,0.00013102105,0.000046703495,0.00025321433,0.000052992196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007264823,0.00037784805,0.00019614001,0.0009898032,0.0006210692,0.0007647073,0.00062806945,0.00037524712,0.0015269106],"category_scores_gemma":[0.0018486689,0.0001293376,0.00029955493,0.0005733206,0.000360202,0.00037106551,0.00049707084,0.00026369878,0.00017856511],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005452311,0.0009001356,0.09090717,0.0018595917,0.00015825027,0.0016989835,0.006268603,0.03408643,0.1221554,0.034158748,0.006378767,0.7008827],"study_design_scores_gemma":[0.00021236115,0.0037826162,0.45657843,0.0013609797,0.00063514133,0.002535782,0.023689171,0.09972012,0.09976348,0.018186338,0.2932265,0.00030903716],"about_ca_topic_score_codex":0.02253335,"about_ca_topic_score_gemma":0.043049205,"teacher_disagreement_score":0.02253335,"about_ca_system_score_codex":0.0014966911,"about_ca_system_score_gemma":0.0015148346,"threshold_uncertainty_score":0.044804394},"labels":[],"label_agreement":null},{"id":"W4365520403","doi":"10.1590/0370-44672021760094","title":"Choice of access for underground mining for feasibility studies","year":2023,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flowchart; Chart; Computer science; Quality (philosophy); Production (economics); Data mining; Mathematics; Statistics","score_opus":0.21756736624585105,"score_gpt":0.3977370267696355,"score_spread":0.18016966052378447,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365520403","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2157405,0.0069736647,0.68316776,0.0011685314,0.0004624512,0.00708165,0.0026708948,0.0012816866,0.081452884],"genre_scores_gemma":[0.3890218,0.004404104,0.58722764,0.00024282868,0.00015905696,0.005195259,0.0015827445,0.0004953079,0.011671194],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97659725,0.010500695,0.002839242,0.0018277724,0.007413952,0.0008210916],"domain_scores_gemma":[0.9370435,0.038479697,0.0068033077,0.004284197,0.011908944,0.0014804123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021225147,0.0009629375,0.0009921669,0.0068780263,0.0010527396,0.004259614,0.001721945,0.0008562877,0.013974752],"category_scores_gemma":[0.052248444,0.0006741134,0.0013201557,0.0039151567,0.0011825683,0.004061634,0.003028916,0.0009066158,0.0031266152],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018806943,0.0005623132,0.036670394,0.008652341,0.0003067711,0.0012386243,0.0074340394,0.00562151,0.020396676,0.043235965,0.007888868,0.8661118],"study_design_scores_gemma":[0.0005440483,0.0055556684,0.10237711,0.018758489,0.0011922292,0.0047042975,0.028446397,0.024483718,0.06804463,0.08449929,0.66069335,0.000700739],"about_ca_topic_score_codex":0.0005766884,"about_ca_topic_score_gemma":0.001285027,"teacher_disagreement_score":0.021225147,"about_ca_system_score_codex":0.0012204563,"about_ca_system_score_gemma":0.0021669988,"threshold_uncertainty_score":0.112250626},"labels":[],"label_agreement":null},{"id":"W4412527904","doi":"10.1590/0370-44672023780121","title":"Benchmarking offshore drilling: methodology and case study","year":2025,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Benchmarking; Submarine pipeline; Drilling; Petroleum engineering; Marine engineering; Offshore drilling; Engineering; Manufacturing engineering; Business; Mechanical engineering; Geotechnical engineering","score_opus":0.020057809359537743,"score_gpt":0.2738164699034879,"score_spread":0.25375866054395013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412527904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7946576,0.0005032938,0.17838863,0.00029845844,0.00003091118,0.0020734642,0.0011239888,0.00014387877,0.022779845],"genre_scores_gemma":[0.92302346,0.0003845318,0.07328165,0.00003070824,0.000012305743,0.000922761,0.0005198021,0.000026539501,0.0017982777],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9970746,0.0019106502,0.00017149905,0.00022677591,0.0004127469,0.00020361083],"domain_scores_gemma":[0.996799,0.0020267311,0.00031221774,0.00024809127,0.000536078,0.00007792056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002898419,0.0005349281,0.00043522607,0.0023346327,0.0005127645,0.0011714771,0.0008958563,0.0011073416,0.0021729192],"category_scores_gemma":[0.005502853,0.00021281895,0.00046374174,0.0033430008,0.00062233134,0.00053820387,0.0010474828,0.00029554713,0.00027567756],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006202893,0.0030141862,0.078928776,0.0023282887,0.00021893806,0.006248184,0.0036554409,0.55072534,0.011988864,0.05011767,0.0042629093,0.28789112],"study_design_scores_gemma":[0.00021340679,0.0025453924,0.05691849,0.0011329785,0.00018083656,0.0024337852,0.016476495,0.8347048,0.026390076,0.018430995,0.040400155,0.00017264205],"about_ca_topic_score_codex":0.0050241547,"about_ca_topic_score_gemma":0.005537265,"teacher_disagreement_score":0.0050241547,"about_ca_system_score_codex":0.0012056838,"about_ca_system_score_gemma":0.0010333582,"threshold_uncertainty_score":0.0153285265},"labels":[],"label_agreement":null}]}