{"meta":{"query_hash":"cf0690b73b6c","filters":{"venue":"REM - International Engineering Journal"},"cohort_total":6,"direct_labels_cover":0,"predictions_cover":6,"exported":6,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/cf0690b73b6c","api":"https://metacan.xera.ac/api/v1/cohort?venue=REM+-+International+Engineering+Journal"},"results":[{"id":"W2572378363","doi":"10.1590/0370-44672016700089","title":"Revisiting the risk concept in Geotechnics: qualitative and quantitative methods","year":2017,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Infrastructure Resilience and Vulnerability Analysis","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ArcelorMittal (Canada)","funders":"","keywords":"Geotechnics; Computer science; Geology; Geotechnical engineering","score_opus":0.01878638913233485,"score_gpt":0.3698378951676363,"score_spread":0.3510515060353015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2572378363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15064053,0.0014475321,0.8454972,0.00084267615,0.00067730236,0.000080649654,0.000014580356,0.000056892262,0.00074261124],"genre_scores_gemma":[0.94639176,0.0006759465,0.052561983,0.00001166871,0.0003169079,0.000004517761,0.0000014736237,0.000016643378,0.000019109242],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904853,0.00011812016,0.00032856537,0.00012316195,0.00019898821,0.00018265919],"domain_scores_gemma":[0.9990024,0.0005126954,0.00014857907,0.0001913429,0.00009286702,0.00005211199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018768976,0.00013567212,0.00019019839,0.00014892522,0.00026504832,0.00029217254,0.0004154547,0.0000603233,0.00003684127],"category_scores_gemma":[0.0019111115,0.000102663194,0.00008572328,0.000069721355,0.00008521579,0.00040042057,0.000057251094,0.0007603594,0.0000020605085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064439237,0.0000024429798,0.000713346,0.000015905858,0.00017763382,0.000015594153,0.0035078928,0.939887,0.0008493733,0.0057546804,0.000025404264,0.04904427],"study_design_scores_gemma":[0.00021941644,0.00001153004,0.021893952,0.00014088166,0.000024540986,0.000106485226,0.0013765926,0.97220665,0.0004644373,0.001936957,0.0014590109,0.00015954646],"about_ca_topic_score_codex":0.000041967334,"about_ca_topic_score_gemma":0.0000043010295,"teacher_disagreement_score":0.7957512,"about_ca_system_score_codex":0.000122030426,"about_ca_system_score_gemma":0.000013284136,"threshold_uncertainty_score":0.41864836},"labels":[],"label_agreement":null},{"id":"W2608478472","doi":"10.1590/0370-44672016700043","title":"A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects","year":2017,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior; Fundação de Amparo à Pesquisa do Estado de São Paulo","keywords":"Process (computing); Production (economics); Stage (stratigraphy); Engineering; Project team; Product (mathematics); Work (physics); Industrial engineering; Computer science; Operations research; Systems engineering; Manufacturing engineering; Mechanical engineering","score_opus":0.02826928401001946,"score_gpt":0.2580681108140243,"score_spread":0.22979882680400485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2608478472","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95181566,0.000041089254,0.047589686,0.000056635818,0.00016462819,0.00018220134,0.000058744765,0.000035313675,0.00005603587],"genre_scores_gemma":[0.96931815,0.000033165048,0.030497083,0.0000014575704,0.00008792142,0.00002526319,0.000012062958,0.00001148983,0.000013378174],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927044,0.000008155874,0.00029727168,0.00014612876,0.00013735164,0.00014063319],"domain_scores_gemma":[0.99956995,0.000033665154,0.00013766863,0.00016914771,0.00006331921,0.00002623576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007363029,0.00011244313,0.00019600886,0.00015164047,0.0000787722,0.00015408122,0.0003387469,0.000046132678,0.0000028072636],"category_scores_gemma":[0.00016470713,0.000095555995,0.00006020501,0.000074932694,0.000019086998,0.00024944553,0.000030503996,0.00014541319,1.4386029e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006642509,0.000089083966,0.105324425,0.000309219,0.0009284583,0.0000061088413,0.0028333818,0.8855694,0.001037543,0.00023916332,0.000082062244,0.0035147523],"study_design_scores_gemma":[0.00022757136,0.00003499841,0.16833708,0.00007038395,0.00006181881,0.00005944388,0.00016799857,0.83069134,0.00017134938,0.000052163454,0.000009448788,0.0001163952],"about_ca_topic_score_codex":0.000015525882,"about_ca_topic_score_gemma":0.000009880101,"teacher_disagreement_score":0.06301266,"about_ca_system_score_codex":0.00014440253,"about_ca_system_score_gemma":0.000017618715,"threshold_uncertainty_score":0.38966605},"labels":[],"label_agreement":null},{"id":"W2996125425","doi":"10.1590/0370-44672019730038","title":"Geochemical assessment of platinum group metals for phytomining","year":2019,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Heavy metals in environment","field":"Environmental Science","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Tailings; Platinum group; Chemistry; Extraction (chemistry); Ammonium acetate; Ammonium oxalate; Environmental chemistry; Soil water; Phytoremediation; Palladium; Platinum; Nuclear chemistry; Inorganic chemistry; Geology; Heavy metals; Catalysis; Chromatography; Soil science; High-performance liquid chromatography","score_opus":0.007578270708524166,"score_gpt":0.25652873666393383,"score_spread":0.24895046595540968,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2996125425","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8644243,0.000034024844,0.12901202,0.00014688597,0.0012626027,0.0001922714,0.000013105999,0.000019732988,0.0048950505],"genre_scores_gemma":[0.89578897,0.000014329211,0.10358648,0.00003615035,0.00015365442,0.000010512777,0.0000069660828,0.000020006,0.00038293548],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998681,0.000013581076,0.00037677377,0.00017165502,0.0005428864,0.00021411727],"domain_scores_gemma":[0.9994712,0.00014270881,0.00016098506,0.00012861153,0.000011124388,0.00008540778],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000623618,0.00012200012,0.00018258751,0.00005812299,0.000024518462,0.000024405128,0.0003087909,0.000052295407,0.0025249633],"category_scores_gemma":[0.00010105936,0.00011519885,0.00013415798,0.000052410494,0.000025020896,0.00020724285,0.00011914632,0.00020923663,0.000043246462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019948327,0.00011551178,0.021989841,0.000026236905,0.00016778604,0.0000053814074,0.000066119916,0.3434147,0.6275309,0.0008915645,0.00058214087,0.005189919],"study_design_scores_gemma":[0.001565503,0.00020657736,0.14926057,0.00015984935,0.00004317717,0.00023590999,0.000051408057,0.76192325,0.027581748,0.0002155582,0.058352355,0.0004040887],"about_ca_topic_score_codex":0.0000022168106,"about_ca_topic_score_gemma":1.9826143e-7,"teacher_disagreement_score":0.5999491,"about_ca_system_score_codex":0.00036242238,"about_ca_system_score_gemma":0.000008937604,"threshold_uncertainty_score":0.99838686},"labels":[],"label_agreement":null},{"id":"W3090806210","doi":"10.1590/0370-44672019730057","title":"Strategies used to control the costs of underground ventilation in some Brazilian mines","year":2020,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Industrial Automation and Control Systems","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ventilation (architecture); Environmental science; Consumption (sociology); Energy consumption; Control (management); Flow (mathematics); Mining engineering; Engineering; Computer science; Electrical engineering; Mechanical engineering; Mathematics","score_opus":0.015560590773655647,"score_gpt":0.2276819336463369,"score_spread":0.21212134287268125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3090806210","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7747514,0.00036532927,0.2120213,0.0074315476,0.0035880643,0.00045065684,0.00002522479,0.0002053947,0.0011610622],"genre_scores_gemma":[0.9991097,0.000007436244,0.00009566501,0.00007689206,0.00066683796,0.000006687192,0.0000028986585,0.00001650395,0.00001738362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991256,0.000020026142,0.000390822,0.00006742242,0.00026932315,0.00012678765],"domain_scores_gemma":[0.99966866,0.00007306969,0.000063489024,0.000055310327,0.000067814966,0.00007168061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019158628,0.00010202961,0.00015410139,0.0001300793,0.000021452037,0.0001233066,0.00021584195,0.000050098908,0.000026397793],"category_scores_gemma":[0.000084900974,0.000086075604,0.00006366486,0.00015010219,0.0000063535435,0.00030834912,0.000009485385,0.00018781288,0.000008510124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002875075,0.0000068482514,0.00021909342,0.000013172216,0.00007889345,0.000006606033,0.0004125253,0.97064614,0.020251574,0.006512232,0.00045114287,0.0013730188],"study_design_scores_gemma":[0.0012859728,0.000038961833,0.00630112,0.00014893328,0.0000100877705,0.000030832358,0.00045899345,0.9851566,0.00066384085,0.00006895195,0.0057017165,0.00013397278],"about_ca_topic_score_codex":0.000012575508,"about_ca_topic_score_gemma":0.000018182183,"teacher_disagreement_score":0.22435828,"about_ca_system_score_codex":0.00015194215,"about_ca_system_score_gemma":0.000030708376,"threshold_uncertainty_score":0.35100615},"labels":[],"label_agreement":null},{"id":"W4365520403","doi":"10.1590/0370-44672021760094","title":"Choice of access for underground mining for feasibility studies","year":2023,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Mining Techniques and Economics","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flowchart; Chart; Computer science; Quality (philosophy); Production (economics); Data mining; Mathematics; Statistics","score_opus":0.21756736624585105,"score_gpt":0.3977370267696355,"score_spread":0.18016966052378447,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365520403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6496462,0.00032852127,0.34505847,0.00029133362,0.0035667417,0.00030777926,0.00007403547,0.0004483504,0.0002785212],"genre_scores_gemma":[0.9585269,0.0004847746,0.03981814,0.0000148306835,0.0008151946,0.00006311445,0.000021187114,0.000060903585,0.00019494446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928284,0.0000024151975,0.00034201154,0.000100084144,0.00008944502,0.00018320097],"domain_scores_gemma":[0.99926317,0.0003874877,0.000071900744,0.00008765822,0.00014583052,0.000043976135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004004355,0.000108199565,0.00018530413,0.000202266,0.000041696367,0.0000644603,0.00029122893,0.00004879658,0.000008451342],"category_scores_gemma":[0.0004320063,0.0001145559,0.00012282089,0.00008607648,0.00001019108,0.00023197861,0.000046061818,0.00009335756,8.9079236e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003078173,0.000016373238,0.0018346547,0.0004663502,0.0006379312,0.0000022307277,0.00030530267,0.9675914,0.0022824372,0.00283553,0.0201927,0.0038042876],"study_design_scores_gemma":[0.00057875685,0.000054212906,0.002509988,0.00018804082,0.000022091508,0.000024307627,0.00010421904,0.97408384,0.0017027509,0.0014408289,0.019108457,0.00018250865],"about_ca_topic_score_codex":0.0000010208495,"about_ca_topic_score_gemma":0.0000023752925,"teacher_disagreement_score":0.30888066,"about_ca_system_score_codex":0.00020695945,"about_ca_system_score_gemma":0.000015467158,"threshold_uncertainty_score":0.4671454},"labels":[],"label_agreement":null},{"id":"W4412527904","doi":"10.1590/0370-44672023780121","title":"Benchmarking offshore drilling: methodology and case study","year":2025,"lang":"en","type":"article","venue":"REM - International Engineering Journal","topic":"Drilling and Well Engineering","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Benchmarking; Submarine pipeline; Drilling; Petroleum engineering; Marine engineering; Offshore drilling; Engineering; Manufacturing engineering; Business; Mechanical engineering; Geotechnical engineering","score_opus":0.020057809359537743,"score_gpt":0.2738164699034879,"score_spread":0.25375866054395013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412527904","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4726408,0.0010410874,0.5195079,0.00006967978,0.0050056465,0.000106250474,0.0000025840427,0.00032014019,0.0013058914],"genre_scores_gemma":[0.9813283,0.0002359941,0.017657015,0.00001796798,0.0005820614,0.000007588644,0.00000213006,0.00004013198,0.00012883072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890965,0.000026869257,0.0004102674,0.00018693571,0.00018693096,0.00027934593],"domain_scores_gemma":[0.999408,0.00022328296,0.00003591621,0.0001352992,0.000083063554,0.000114406466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006293184,0.00022863918,0.00025338947,0.00053373683,0.000097020406,0.0001579828,0.00019634509,0.00009068733,0.000027229275],"category_scores_gemma":[0.00012846082,0.00023843213,0.00007581479,0.00020025448,0.000014253128,0.000163916,0.00005978216,0.00057691353,0.0000024084584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004933366,0.000023787641,0.001960475,0.000045840818,0.00041409605,0.001464054,0.00049196417,0.97365004,0.0007563102,0.0006272417,0.00024049827,0.02032076],"study_design_scores_gemma":[0.0005091596,0.000038269147,0.0011048134,0.00015264751,0.000050986117,0.008320388,0.00044605727,0.9807295,0.00025337774,0.00007095212,0.0080778375,0.00024600932],"about_ca_topic_score_codex":0.0000126692685,"about_ca_topic_score_gemma":0.000005186177,"teacher_disagreement_score":0.50868744,"about_ca_system_score_codex":0.00014522436,"about_ca_system_score_gemma":0.000018958215,"threshold_uncertainty_score":0.972298},"labels":[],"label_agreement":null}]}