{"meta":{"query_hash":"434ce931bbac","filters":{"venue":"Railway age"},"cohort_total":53,"direct_labels_cover":0,"predictions_cover":53,"exported":53,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/434ce931bbac","api":"https://metacan.xera.ac/api/v1/cohort?venue=Railway+age"},"results":[{"id":"W104398450","doi":"","title":"SIMPLIFYING SIGNAL DESIGN","year":2000,"lang":"en","type":"article","venue":"Railway age","topic":"Geographic Information Systems Studies","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Subdivision; SIGNAL (programming language); Interface (matter); Telecommunications; Computer science; Graphical user interface; Transport engineering; Engineering; Systems engineering; Civil engineering; Operating system","score_opus":0.04865488214631431,"score_gpt":0.2984645753396106,"score_spread":0.24980969319329632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W104398450","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035494934,0.00028956187,0.9756404,0.00066862657,0.0002348092,0.000111585054,0.000117457734,0.0013167526,0.018071368],"genre_scores_gemma":[0.12449696,0.0012674847,0.8459293,0.0013568526,0.00043221208,0.0003219992,0.00046926376,0.0016499972,0.024075974],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9944798,0.0023008082,0.00035591066,0.00074608985,0.0017280789,0.00038935893],"domain_scores_gemma":[0.99458367,0.0022585196,0.0002189191,0.0016704428,0.0011135116,0.00015498481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004059405,0.0018018924,0.00091204,0.0013236488,0.0014666491,0.0040525305,0.0023832482,0.0016628902,0.024572548],"category_scores_gemma":[0.016488878,0.0009759473,0.0014294329,0.001191293,0.002733312,0.007316296,0.0036186979,0.0038760277,0.012209932],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036735713,0.00009569512,0.00079452054,0.0005487875,0.00008255622,0.00037917268,0.0006670483,0.038217336,0.014230254,0.65678734,0.021045215,0.26678467],"study_design_scores_gemma":[0.00019715738,0.0004375168,0.0003412033,0.00026387,0.00019207022,0.000786246,0.00035867223,0.12783013,0.022881716,0.5217395,0.32487544,0.000096586984],"about_ca_topic_score_codex":0.0022517166,"about_ca_topic_score_gemma":0.003460372,"teacher_disagreement_score":0.024572548,"about_ca_system_score_codex":0.0015419651,"about_ca_system_score_gemma":0.0018587082,"threshold_uncertainty_score":0.08220339},"labels":[],"label_agreement":null},{"id":"W1154546401","doi":"","title":"CP's Next Move","year":2015,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Merge (version control); Revenue; Rail network; Potash; Finance; Business; Transport engineering; Agricultural economics; Engineering; Economics; Computer science","score_opus":0.044552888089753946,"score_gpt":0.21882491745786609,"score_spread":0.17427202936811215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1154546401","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006295348,0.0025190616,0.0011573066,0.382942,0.008178754,0.000064158616,0.0011615559,0.00031139428,0.5973704],"genre_scores_gemma":[0.14905718,0.007867093,0.0046932003,0.1824753,0.0026946452,0.00009598147,0.0019260349,0.00033245134,0.6508582],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9945886,0.0002583146,0.00008387136,0.00041847347,0.0022470434,0.002403734],"domain_scores_gemma":[0.9927025,0.00019739513,0.00009518252,0.00017514243,0.0021665548,0.0046632523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027459802,0.0005581319,0.00028948332,0.0013574169,0.011574776,0.011852333,0.001817764,0.0067190584,0.092386425],"category_scores_gemma":[0.007914065,0.0002761787,0.00058353454,0.0015482856,0.0023867756,0.0059292,0.0043868017,0.008476158,0.016295405],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001685609,0.00002957969,0.0011228619,0.000036913345,0.0000043137907,0.00022653434,0.00048290237,0.0000724633,0.00010380463,0.08821644,0.8699513,0.039736144],"study_design_scores_gemma":[0.0000016659617,0.000006206425,0.0007957676,0.000038970516,0.0000017091535,0.000068135174,0.0008179067,0.000032640517,0.000032814554,0.0021708922,0.99602544,0.000007911974],"about_ca_topic_score_codex":0.6052502,"about_ca_topic_score_gemma":0.6996636,"teacher_disagreement_score":0.6052502,"about_ca_system_score_codex":0.02251078,"about_ca_system_score_gemma":0.10070724,"threshold_uncertainty_score":0.79414916},"labels":[],"label_agreement":null},{"id":"W1203570106","doi":"","title":"Ontario on the Move","year":2015,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Public transport; Transit (satellite); Rail transit; Transport engineering; Commission; Anticipation (artificial intelligence); Light rail transit; Transportation planning; Transit system; Rapid transit; Public administration; Engineering; Business; Telecommunications; Political science; Finance; Computer science","score_opus":0.04473940579006429,"score_gpt":0.2027555869303174,"score_spread":0.15801618114025312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1203570106","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00600001,0.0027131324,0.00030768118,0.032904577,0.002410757,0.00010234626,0.0055662324,0.0002576619,0.9497376],"genre_scores_gemma":[0.00823574,0.0008750581,0.00018666883,0.0021387546,0.000097614524,0.000015555579,0.0008316417,0.00005175811,0.9875672],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892586,0.000034190307,0.000024482948,0.00012662743,0.0004496722,0.00043908905],"domain_scores_gemma":[0.9983701,0.000027616648,0.000034229666,0.000053024894,0.0007174474,0.00079756527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000415334,0.000508902,0.00036479745,0.00073061365,0.0070434795,0.004565919,0.00073532894,0.0017732126,0.2829064],"category_scores_gemma":[0.0009953685,0.00035067505,0.0003228253,0.0016506921,0.00094831095,0.0013013522,0.0019098305,0.0012931895,0.046203837],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031605563,0.000012949699,0.0019068503,0.000071747134,0.000004723939,0.0002394161,0.00036368956,0.00005086663,0.0002735613,0.014137006,0.95634717,0.026560444],"study_design_scores_gemma":[0.000002784039,0.000003141915,0.0019383241,0.000015452075,0.0000015488213,0.000016351956,0.00021826141,0.000016002286,0.000033704953,0.00015205384,0.9975988,0.0000035485853],"about_ca_topic_score_codex":0.9520955,"about_ca_topic_score_gemma":0.98790216,"teacher_disagreement_score":0.9649018,"about_ca_system_score_codex":0.035098225,"about_ca_system_score_gemma":0.07731678,"threshold_uncertainty_score":0.94641626},"labels":[],"label_agreement":null},{"id":"W1507370507","doi":"","title":"Passenger Rail Planner's Guide 2006","year":2006,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Memphis; Miami; Atlanta; Metropolitan area; Phoenix; Salt lake; Light rail transit; Baton rouge; Transport engineering; Archaeology; Engineering; Public transport; History","score_opus":0.00455341154230359,"score_gpt":0.18224754258693499,"score_spread":0.1776941310446314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1507370507","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00056067144,0.0015162663,0.0052805073,0.0034246969,0.00094612635,0.00067352183,0.059525203,0.0038807585,0.9241923],"genre_scores_gemma":[0.0031536776,0.0027109378,0.0053856857,0.0014138434,0.0001481005,0.00043667862,0.043717097,0.0008287704,0.94220513],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998694,0.00009927001,0.0000814692,0.00011610556,0.000858874,0.0001503303],"domain_scores_gemma":[0.99795157,0.00016996589,0.00006236075,0.00011910586,0.0015549562,0.00014202808],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014074583,0.0011583648,0.00058195327,0.0029235594,0.0017830466,0.0034502365,0.0015701012,0.001980955,0.35437623],"category_scores_gemma":[0.0045148134,0.00090483984,0.00047096916,0.0039610774,0.00026128,0.0022493417,0.0010776278,0.002446336,0.25813782],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000079429665,0.000013953495,0.00006813995,0.00003133261,5.8159696e-7,0.000013277709,0.0000224232,0.00016077883,0.000033277203,0.0019290656,0.9682692,0.029450083],"study_design_scores_gemma":[0.0000032311114,0.0000045006436,0.00019029285,0.000024681643,4.5798157e-7,0.000009260279,0.000022652563,0.00006892134,0.000015984146,0.00026228323,0.9993943,0.0000035089845],"about_ca_topic_score_codex":0.106714725,"about_ca_topic_score_gemma":0.17038903,"teacher_disagreement_score":0.35437623,"about_ca_system_score_codex":0.002909431,"about_ca_system_score_gemma":0.009313822,"threshold_uncertainty_score":0.9209039},"labels":[],"label_agreement":null},{"id":"W1569076607","doi":"","title":"Westward Expansion: While the Trains Kept Moving, CPR Built New Capacity in Western Canada To Handle Surging Traffic","year":2005,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Train; Freight trains; Mount; Upgrade; Transport engineering; Work (physics); Investment (military); Geography; Engineering; Archaeology; Computer science; Political science","score_opus":0.03619382423876611,"score_gpt":0.20648045186053635,"score_spread":0.17028662762177024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1569076607","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19887295,0.004255257,0.0070929546,0.012585668,0.00053443015,0.00032866013,0.002889868,0.0012462789,0.77219385],"genre_scores_gemma":[0.28137967,0.0031489779,0.0060170526,0.003163942,0.00006937093,0.000067064284,0.0019444551,0.00032714443,0.7038823],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991749,0.000023793167,0.000014757687,0.00008912118,0.0003319338,0.00036543273],"domain_scores_gemma":[0.9993098,0.000016233464,0.000028285916,0.000030985997,0.0004536087,0.00016118451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003655001,0.00047450882,0.00013821915,0.00083758385,0.005397932,0.0027535276,0.0006739878,0.00063998083,0.025374759],"category_scores_gemma":[0.0006405181,0.00023347732,0.0002098899,0.001782092,0.0010925209,0.0013749746,0.0014134875,0.0011500249,0.0037770995],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014519705,0.00012722732,0.03691132,0.00038259214,0.000020323028,0.001326641,0.007555743,0.001147985,0.011477356,0.03747098,0.3156525,0.58778214],"study_design_scores_gemma":[0.000006908841,0.000035995286,0.056314535,0.00011293905,0.000012369168,0.00030474563,0.0032246832,0.00024957603,0.0029302167,0.0005464596,0.9362344,0.000027154296],"about_ca_topic_score_codex":0.9590251,"about_ca_topic_score_gemma":0.98675656,"teacher_disagreement_score":0.040974915,"about_ca_system_score_codex":0.01654564,"about_ca_system_score_gemma":0.04169514,"threshold_uncertainty_score":0.12004757},"labels":[],"label_agreement":null},{"id":"W1578449866","doi":"","title":"WEATHERING THE STORM","year":2004,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Engineering and Dynamics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"National weather service; Service (business); Storm; Warning system; Track (disk drive); Extreme weather; Event (particle physics); Service provider; Transport engineering; Business; Meteorology; Engineering; Telecommunications; Climate change; Geography","score_opus":0.006469460742385321,"score_gpt":0.1846978562459195,"score_spread":0.17822839550353417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1578449866","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12025655,0.015718093,0.008804228,0.03748079,0.017792411,0.0001475865,0.009276935,0.0027801595,0.78774315],"genre_scores_gemma":[0.674336,0.020409541,0.005423394,0.013257907,0.0065311147,0.00005341053,0.0074376636,0.0012594427,0.27129146],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996431,0.00003405651,0.000021009178,0.00005872558,0.0001404655,0.00010265059],"domain_scores_gemma":[0.99949765,0.00003249882,0.00007777283,0.00006916809,0.00020325446,0.00011956579],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035590315,0.00035799082,0.00027994288,0.00051236316,0.0017621691,0.0026144972,0.00025919432,0.0008464604,0.01850195],"category_scores_gemma":[0.0014111928,0.0001613526,0.00024824738,0.0007380293,0.00072995154,0.001826507,0.0013580841,0.0013452184,0.0057966127],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031780306,0.000052186744,0.048452735,0.00037052506,0.00007449394,0.0012337426,0.003513972,0.0013750248,0.008656906,0.021997198,0.7230145,0.19094093],"study_design_scores_gemma":[0.00001118876,0.00003267464,0.022944622,0.00010017586,0.00001836831,0.00020090594,0.0014433698,0.00020778726,0.0007761956,0.0026305967,0.9716197,0.00001429745],"about_ca_topic_score_codex":0.026830684,"about_ca_topic_score_gemma":0.039195564,"teacher_disagreement_score":0.026830684,"about_ca_system_score_codex":0.0015987394,"about_ca_system_score_gemma":0.001240838,"threshold_uncertainty_score":0.061895132},"labels":[],"label_agreement":null},{"id":"W211368854","doi":"","title":"Passenger Rail Planner's Guide 2009: A Growth Industry Picks Up Speed","year":2009,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Memphis; Miami; Atlanta; Phoenix; Salt lake; St louis; Archaeology; Engineering; Metropolitan area; History; Art history","score_opus":0.01829225811230369,"score_gpt":0.22269760967527916,"score_spread":0.20440535156297546,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W211368854","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017044237,0.002611389,0.013183068,0.020942977,0.0053792866,0.00089261256,0.039834768,0.015517393,0.8999341],"genre_scores_gemma":[0.0048693134,0.005202188,0.012771809,0.002103047,0.00045254757,0.0003497265,0.022662008,0.0032381157,0.94835126],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99873763,0.00008630428,0.000077441495,0.000070531394,0.0008784264,0.00014972991],"domain_scores_gemma":[0.9961588,0.00030341843,0.00012790198,0.00016460413,0.0027816438,0.0004637428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015411135,0.0013000123,0.00050466077,0.002875075,0.0015881411,0.0050986786,0.0012344851,0.0021078405,0.20861869],"category_scores_gemma":[0.0067361654,0.00087406655,0.0005051498,0.004422796,0.00034921363,0.0037736758,0.0016152982,0.003191562,0.18376486],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000385323,0.0000065610434,0.00006731283,0.000012612561,3.359781e-7,0.000008119126,0.000014482065,0.00009733306,0.000028553195,0.0008618122,0.9771757,0.021723293],"study_design_scores_gemma":[0.0000036717806,0.000004234561,0.00022804954,0.000022508797,4.915084e-7,0.000009423346,0.000029895653,0.00007936581,0.000023930803,0.00020983859,0.9993838,0.000004796135],"about_ca_topic_score_codex":0.12591635,"about_ca_topic_score_gemma":0.20957321,"teacher_disagreement_score":0.20861869,"about_ca_system_score_codex":0.0030260491,"about_ca_system_score_gemma":0.0113883875,"threshold_uncertainty_score":0.69789904},"labels":[],"label_agreement":null},{"id":"W212177908","doi":"","title":"On the Move Again","year":2015,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transit (satellite); Transport engineering; Commission; Bay; Light rail transit; Rail transit; Transit system; Rapid transit; Public transport; Engineering; Telecommunications; Business; Civil engineering; Finance","score_opus":0.034708420016960485,"score_gpt":0.21048425697260348,"score_spread":0.175775836955643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W212177908","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006778797,0.0046281437,0.0013512145,0.59899837,0.02233343,0.000019217408,0.00048182896,0.00030970533,0.36509934],"genre_scores_gemma":[0.046416912,0.004766764,0.0018930135,0.18408495,0.006272363,0.000029274439,0.0005913174,0.00031538072,0.75563],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99771947,0.00031736583,0.00006406202,0.00044884288,0.0007961672,0.000654033],"domain_scores_gemma":[0.9967083,0.0002815072,0.00014351611,0.00030765426,0.0011902063,0.0013688402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015991491,0.0004990082,0.00037898583,0.0008716302,0.005379011,0.012243171,0.0010257933,0.00478068,0.16362163],"category_scores_gemma":[0.0061021093,0.00020771567,0.000493252,0.0010547462,0.004086975,0.0103670405,0.004940334,0.009681823,0.05192117],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028503788,0.00004224612,0.0017284143,0.000046344863,0.000007906103,0.00010542515,0.0015543799,0.00004461007,0.00040502183,0.1186828,0.8209707,0.056383494],"study_design_scores_gemma":[0.0000016671802,0.000007526444,0.00073652,0.000036129342,0.0000017569765,0.000031672676,0.0017696131,0.000011833669,0.0000524309,0.0032788133,0.9940666,0.0000055058704],"about_ca_topic_score_codex":0.022409573,"about_ca_topic_score_gemma":0.040590987,"teacher_disagreement_score":0.16362163,"about_ca_system_score_codex":0.003328924,"about_ca_system_score_gemma":0.005602325,"threshold_uncertainty_score":0.5473689},"labels":[],"label_agreement":null},{"id":"W2206645761","doi":"","title":"Bee Line to Hamilton's B Line","year":2015,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Light rail transit; Transit (satellite); Mile; Transport engineering; Line (geometry); Agency (philosophy); Engineering; Rail transit; Rapid transit; Telecommunications; Geography; Public transport; Sociology; Mathematics","score_opus":0.04187942149861849,"score_gpt":0.237016274008087,"score_spread":0.19513685250946852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2206645761","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006352034,0.00067539234,0.00084961473,0.0054058726,0.0012451233,0.00016141094,0.0019490916,0.00052472594,0.98283684],"genre_scores_gemma":[0.008548484,0.00024807744,0.00033538076,0.0006679273,0.00003320265,0.000013401158,0.0002687716,0.00006590685,0.989819],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99958616,0.000016027056,0.000009266457,0.000078835285,0.00019006057,0.000119616634],"domain_scores_gemma":[0.99903995,0.000032974727,0.000023807928,0.000048685593,0.00055773056,0.00029683087],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0001641349,0.00036043042,0.00018584775,0.00074443105,0.004539239,0.0025041862,0.0005235693,0.0010522864,0.48037022],"category_scores_gemma":[0.00086278125,0.0002700625,0.00021809852,0.0010108497,0.00075988815,0.00080379937,0.0011624282,0.0010127019,0.121853635],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057049576,0.000024734632,0.0022824958,0.00007538204,0.0000048278766,0.00042726714,0.0005053939,0.000074438685,0.0008820355,0.0167827,0.89293563,0.08594789],"study_design_scores_gemma":[0.000005261994,0.000011979778,0.002141783,0.000021239515,0.0000015631693,0.000045016357,0.00024995246,0.000031535375,0.0001490725,0.0002730465,0.99706537,0.0000042363163],"about_ca_topic_score_codex":0.66217893,"about_ca_topic_score_gemma":0.88978565,"teacher_disagreement_score":0.66217893,"about_ca_system_score_codex":0.0077218977,"about_ca_system_score_gemma":0.013209142,"threshold_uncertainty_score":0.74118876},"labels":[],"label_agreement":null},{"id":"W2221724933","doi":"","title":"CN: Capital-intensive, customer-driven","year":2013,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Port (circuit theory); Finance; Investment (military); Business; Joint venture; Capital (architecture); Container (type theory); Venture capital; Capital investment; Terminal (telecommunication); Transport engineering; Economy; Engineering; Commerce; Economics; Telecommunications; Political science; Geography","score_opus":0.015392146511401316,"score_gpt":0.19693690659111127,"score_spread":0.18154476007970996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2221724933","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08831931,0.0004249228,0.006674992,0.005554507,0.00018337261,0.00017882777,0.0015000652,0.00053520757,0.8966287],"genre_scores_gemma":[0.71036947,0.00076895213,0.0038936816,0.0018754555,0.000083862884,0.00005074801,0.0016524784,0.00017112531,0.2811343],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982804,0.0000864134,0.000032143525,0.00017227625,0.0010159959,0.00041288795],"domain_scores_gemma":[0.9969951,0.00016180509,0.00026893482,0.0002343623,0.0015777422,0.0007620057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011883129,0.00024439913,0.00009455022,0.0009857265,0.0015414489,0.004833372,0.00086695526,0.000667924,0.021951182],"category_scores_gemma":[0.0025887166,0.00014887807,0.00009955519,0.002367154,0.0007740994,0.0019711328,0.0014418481,0.00073296245,0.0040307986],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014784635,0.00018077195,0.0567942,0.00018793068,0.000015769516,0.0010589779,0.0016128216,0.004380083,0.0028027962,0.28149644,0.348999,0.30232343],"study_design_scores_gemma":[0.000012811225,0.000053562922,0.037057735,0.00006628624,0.000012292221,0.0006018317,0.0021372254,0.005807265,0.001933506,0.010668293,0.94160295,0.000046261754],"about_ca_topic_score_codex":0.24939297,"about_ca_topic_score_gemma":0.35577697,"teacher_disagreement_score":0.24939297,"about_ca_system_score_codex":0.012020084,"about_ca_system_score_gemma":0.020033367,"threshold_uncertainty_score":0.4958827},"labels":[],"label_agreement":null},{"id":"W232303246","doi":"","title":"Modernizing a Maze","year":2005,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interlocking; Bidding; Architecture; Transit (satellite); Engineering; Telecommunications; Transport engineering; European union; Track (disk drive); Business; Public transport","score_opus":0.02233128827677767,"score_gpt":0.2056626673578658,"score_spread":0.18333137908108815,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W232303246","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007164304,0.004970261,0.026482971,0.039246593,0.0023262284,0.00008440377,0.00023110751,0.0008552144,0.918639],"genre_scores_gemma":[0.25043032,0.010752826,0.032818556,0.008732887,0.0013270304,0.0002052709,0.00060487795,0.0011626754,0.6939655],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99841166,0.00038012394,0.000034999306,0.00023303839,0.00046616636,0.0004740044],"domain_scores_gemma":[0.9978721,0.00023847085,0.00006554535,0.00043889054,0.0005293438,0.00085565756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001996174,0.0011512032,0.00036832935,0.0013809333,0.007856654,0.01126745,0.0017957772,0.003340936,0.0736334],"category_scores_gemma":[0.003563765,0.0004819411,0.00051994924,0.0012302839,0.011895748,0.012293842,0.008202804,0.004565197,0.017152697],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030887095,0.000023182305,0.00040667364,0.000070271184,0.000007112498,0.00014295307,0.004207982,0.0009963589,0.0003398885,0.78737247,0.15666991,0.04973233],"study_design_scores_gemma":[0.0000048525917,0.000013059134,0.00012852719,0.00006529238,0.0000018431818,0.000051034218,0.0011676865,0.0003231438,0.00008051483,0.052314717,0.94584113,0.000008339056],"about_ca_topic_score_codex":0.056473147,"about_ca_topic_score_gemma":0.1155047,"teacher_disagreement_score":0.0736334,"about_ca_system_score_codex":0.011994189,"about_ca_system_score_gemma":0.011725687,"threshold_uncertainty_score":0.2463283},"labels":[],"label_agreement":null},{"id":"W2507178846","doi":"","title":"Regional Railroad of the Year: Central Maine & Quebec Railway","year":2016,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Railway system; Transport engineering; Rail transportation; Investment (military); Engineering; Business; Civil engineering; Forensic engineering; Political science","score_opus":0.015037169429823945,"score_gpt":0.19288667124307193,"score_spread":0.177849501813248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2507178846","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.109968185,0.020720981,0.0022976073,0.031359844,0.0038541313,0.0002925842,0.034102622,0.0012626288,0.7961415],"genre_scores_gemma":[0.22523548,0.0039004066,0.0011948522,0.0020446551,0.00021516193,0.000057568643,0.0057893423,0.00017629904,0.76138616],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99945754,0.000021605856,0.000011963757,0.00009999836,0.00016538483,0.00024359267],"domain_scores_gemma":[0.9988965,0.000023250019,0.0000584676,0.000022153778,0.0007527775,0.00024676658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003133122,0.0004956729,0.00025358904,0.0014074309,0.0039250897,0.0027710064,0.00072806806,0.0010480054,0.07440211],"category_scores_gemma":[0.00081280567,0.00019965525,0.0003549119,0.0024935934,0.0005975113,0.00086046144,0.0007968644,0.0010717309,0.0071354075],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011230387,0.00005107713,0.040614095,0.00019019328,0.00002735169,0.0005296735,0.0013795595,0.0011206453,0.0011941739,0.014666699,0.8273791,0.11273517],"study_design_scores_gemma":[0.000008415133,0.000023534165,0.14148259,0.00013986915,0.0000100377865,0.00015945357,0.0014505058,0.00028294066,0.0002153115,0.0001819073,0.85601735,0.000028001563],"about_ca_topic_score_codex":0.9859416,"about_ca_topic_score_gemma":0.99508154,"teacher_disagreement_score":0.9859416,"about_ca_system_score_codex":0.035904028,"about_ca_system_score_gemma":0.037896562,"threshold_uncertainty_score":0.26050317},"labels":[],"label_agreement":null},{"id":"W2588580788","doi":"","title":"Fighting Fire with Fire Trains","year":2016,"lang":"en","type":"article","venue":"Railway age","topic":"Fire effects on ecosystems","field":"Environmental Science","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Train; Freight trains; Engineering; Forensic engineering; Wildfire suppression; Transport engineering; Fire protection; Aeronautics; Civil engineering; Geography; Archaeology","score_opus":0.006975810038303658,"score_gpt":0.1932083660249402,"score_spread":0.18623255598663654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2588580788","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27319932,0.010882438,0.037691686,0.025718326,0.0037259606,0.00017651712,0.00027772557,0.0011067886,0.64722127],"genre_scores_gemma":[0.8251866,0.0124059,0.028252723,0.0042920853,0.0008132547,0.00007242311,0.00027152488,0.00014832377,0.12855715],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997352,0.000051392744,0.000006613471,0.000022773227,0.00010092561,0.00008318953],"domain_scores_gemma":[0.999691,0.000057992675,0.000032166176,0.000023219654,0.00008442658,0.00011123327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056426367,0.000289776,0.0001671839,0.00040147125,0.0020867176,0.00172992,0.00043288767,0.00075400213,0.010171314],"category_scores_gemma":[0.0014211932,0.00013871878,0.0002103166,0.0002679512,0.00065488723,0.0010064576,0.001151218,0.0010879242,0.0022626638],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002545866,0.00045843818,0.034361985,0.0002636931,0.0001183975,0.00055439345,0.0029682836,0.0064500994,0.010599191,0.02023123,0.12869488,0.79504484],"study_design_scores_gemma":[0.00005638825,0.00064103684,0.02854805,0.0004084829,0.0000721172,0.00078173965,0.007914266,0.0082909595,0.0054676537,0.016114581,0.9316476,0.00005721754],"about_ca_topic_score_codex":0.02576448,"about_ca_topic_score_gemma":0.09845264,"teacher_disagreement_score":0.02576448,"about_ca_system_score_codex":0.00087813113,"about_ca_system_score_gemma":0.0014623265,"threshold_uncertainty_score":0.051229},"labels":[],"label_agreement":null},{"id":"W2592153782","doi":"","title":"CP + NS: Where Do Small Roads Figure?","year":2016,"lang":"en","type":"article","venue":"Railway age","topic":"Canadian Policy and Governance","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Competition (biology); Transport engineering; Business; Telecommunications; Economic geography; Regional science; Engineering; Economics; Geography","score_opus":0.021761032532491002,"score_gpt":0.26756536200530473,"score_spread":0.24580432947281372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2592153782","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03400782,0.0041719116,0.0023304664,0.13880737,0.0017226987,0.00007342372,0.0036202257,0.0003866235,0.81487954],"genre_scores_gemma":[0.55733734,0.0088062,0.0024030928,0.012278798,0.00050830626,0.0000734494,0.0021711523,0.0003092576,0.41611236],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99861383,0.00011048038,0.000028536802,0.0001375306,0.00038460226,0.00072491093],"domain_scores_gemma":[0.99666804,0.00027333645,0.00025307183,0.00009147927,0.0018404819,0.00087357796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008557241,0.00024896653,0.0002791529,0.0014294377,0.005787115,0.0075770337,0.0010226503,0.0015127122,0.06764627],"category_scores_gemma":[0.0058186576,0.00019874318,0.00026095012,0.0041005486,0.0020494899,0.0050371387,0.0016831205,0.0017691448,0.009858053],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056350178,0.00002998209,0.024411803,0.0002939677,0.000011229899,0.00037467122,0.003114001,0.0005060433,0.00023199528,0.31053233,0.5049118,0.15552591],"study_design_scores_gemma":[0.000006452912,0.000010316073,0.018450467,0.00023602367,0.000013219925,0.00015884325,0.010997055,0.00022514835,0.0002810766,0.01241398,0.95718,0.000027264252],"about_ca_topic_score_codex":0.8442681,"about_ca_topic_score_gemma":0.89592236,"teacher_disagreement_score":0.15573192,"about_ca_system_score_codex":0.015655799,"about_ca_system_score_gemma":0.030186137,"threshold_uncertainty_score":0.31329805},"labels":[],"label_agreement":null},{"id":"W263915350","doi":"","title":"Bold Plans for Toronto","year":2008,"lang":"en","type":"article","venue":"Railway age","topic":"Underground infrastructure and sustainability","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transit (satellite); Light rail transit; Transport engineering; Rail transit; Plan (archaeology); Light rail; Rapid transit; Commission; Public transport; Urban transit; Transit system; Engineering; Business; Telecommunications; Finance; Geography; Archaeology","score_opus":0.010035400360400942,"score_gpt":0.20785209463725982,"score_spread":0.19781669427685888,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W263915350","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006596018,0.0038663608,0.0013376294,0.036880076,0.0049101566,0.00019243061,0.0036643813,0.0007387165,0.9418143],"genre_scores_gemma":[0.019301867,0.0012931692,0.0010917829,0.0020995012,0.00018109631,0.000049589406,0.0016649346,0.00017130475,0.9741468],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99924576,0.00005193142,0.000012420421,0.000065510874,0.00031760804,0.0003068087],"domain_scores_gemma":[0.9989065,0.000029560353,0.00002217628,0.00004898412,0.00033808907,0.000654798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041714494,0.00080041034,0.00018086385,0.0008099233,0.008329522,0.0043040304,0.00077978655,0.0022018955,0.21404022],"category_scores_gemma":[0.0009662653,0.0004050095,0.00034911593,0.00082857994,0.0008837441,0.0012374971,0.0028750997,0.0023988502,0.041426454],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027516817,0.000018577979,0.00044973078,0.00005650485,0.0000029539947,0.00026791927,0.0004891185,0.00018606464,0.00031563098,0.034593135,0.93947595,0.024116956],"study_design_scores_gemma":[0.000002493176,0.0000045781544,0.0004719199,0.000015236738,8.6066433e-7,0.00002044064,0.00030530695,0.000027740742,0.00004307294,0.00037068716,0.99873406,0.0000035849664],"about_ca_topic_score_codex":0.57440877,"about_ca_topic_score_gemma":0.85752404,"teacher_disagreement_score":0.42559123,"about_ca_system_score_codex":0.013435459,"about_ca_system_score_gemma":0.028862024,"threshold_uncertainty_score":0.8561952},"labels":[],"label_agreement":null},{"id":"W2916049085","doi":"","title":"Passenger Rail Planner's Guide 2008","year":2008,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Memphis; Miami; Atlanta; Metropolitan area; Phoenix; Salt lake; Baton rouge; Public transport; Downtown; Transport engineering; Engineering; Archaeology; History; Political science; Law","score_opus":0.023513262083631713,"score_gpt":0.20597251254014154,"score_spread":0.18245925045650982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2916049085","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004128863,0.002402111,0.004338271,0.006894418,0.0020213022,0.000473367,0.028181182,0.005820692,0.9494557],"genre_scores_gemma":[0.0012864558,0.002483708,0.0029338235,0.0017187571,0.00021543173,0.00026578913,0.014563502,0.0007962587,0.9757363],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99898714,0.000066012064,0.000058385034,0.00010439224,0.00067685376,0.0001072417],"domain_scores_gemma":[0.99841666,0.00016093192,0.00005955293,0.00009397627,0.0011079126,0.00016092607],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011445115,0.0012112955,0.00062334706,0.0026254584,0.0016647554,0.003771323,0.001485165,0.0025974384,0.46322316],"category_scores_gemma":[0.004177407,0.00089175487,0.00044199868,0.003236,0.00028828526,0.0030720253,0.0015392804,0.0027720726,0.35460624],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005743733,0.000008182257,0.00003617457,0.000028640085,2.9202033e-7,0.000010100205,0.00001663901,0.000058838315,0.000027574308,0.0011853473,0.963542,0.035080463],"study_design_scores_gemma":[0.0000020002892,0.0000029974076,0.00008268381,0.000020760626,2.1455783e-7,0.000007325529,0.000015008451,0.000028736102,0.000008006064,0.00018074864,0.9996494,0.0000020426123],"about_ca_topic_score_codex":0.052332334,"about_ca_topic_score_gemma":0.111028485,"teacher_disagreement_score":0.46322316,"about_ca_system_score_codex":0.0026193,"about_ca_system_score_gemma":0.008255665,"threshold_uncertainty_score":0.765647},"labels":[],"label_agreement":null},{"id":"W353852381","doi":"","title":"RAILROADING IN 2005: FLUIDITY, VELOCITY, CAPACITY, CONSISTENCY","year":2004,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Revenue; Deregulation; Preparedness; Optimism; Consistency (knowledge bases); Traffic volume; Quarter (Canadian coin); Business; Transportation industry; Finance; Transport engineering; Engineering; Economics; Geography; Management; Market economy; Archaeology","score_opus":0.03151873785871568,"score_gpt":0.2152487082651511,"score_spread":0.18372997040643543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W353852381","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6396558,0.00579079,0.0048920107,0.10982136,0.0016538525,0.00009343246,0.0005544617,0.00013256073,0.23740576],"genre_scores_gemma":[0.97748905,0.0010027768,0.0010129344,0.0018200199,0.00014132546,0.000013264649,0.00019790913,0.00001747044,0.01830528],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981927,0.00044307517,0.00018344902,0.00015936959,0.00065558683,0.00036581515],"domain_scores_gemma":[0.99678504,0.00045728957,0.0009452551,0.00009862266,0.001227692,0.00048602142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002368889,0.00014084777,0.00012989748,0.0008744873,0.0030185406,0.0064159473,0.00048651037,0.0011688281,0.0031571756],"category_scores_gemma":[0.0111024,0.00015036654,0.0001362365,0.0019505547,0.0015927288,0.004127213,0.0017248507,0.0018341219,0.0002779761],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021352616,0.000121799196,0.1198099,0.00028338344,0.000037717564,0.00086730707,0.08143074,0.0033331586,0.0011856854,0.36011165,0.19743755,0.23516764],"study_design_scores_gemma":[0.000011672083,0.00013303578,0.11182789,0.00041452915,0.000024357862,0.00029248133,0.10919342,0.0015805525,0.0007815003,0.015274128,0.7603929,0.000073622796],"about_ca_topic_score_codex":0.09295177,"about_ca_topic_score_gemma":0.14149931,"teacher_disagreement_score":0.09295177,"about_ca_system_score_codex":0.01119605,"about_ca_system_score_gemma":0.0062033203,"threshold_uncertainty_score":0.18482149},"labels":[],"label_agreement":null},{"id":"W561557277","doi":"","title":"CN: SAFER, FASTER, SMARTER","year":2004,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"SAFER; Standardization; Modernization theory; Intelligent transportation system; Service (business); Business; Engineering; Transport engineering; Engineering management; Computer science; Marketing; Economics; Economic growth; Computer security","score_opus":0.01718081879502249,"score_gpt":0.19861552918478978,"score_spread":0.1814347103897673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W561557277","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025999084,0.0032286607,0.0038980804,0.06552716,0.0026713072,0.00013700138,0.0025817929,0.0015080599,0.8944488],"genre_scores_gemma":[0.2614822,0.005788409,0.01131589,0.013306827,0.0005870704,0.000049845476,0.002798021,0.0004950524,0.70417666],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966884,0.00013594094,0.000062812156,0.00024443967,0.0023812926,0.00048710182],"domain_scores_gemma":[0.9970867,0.0000792241,0.00019051383,0.0001282582,0.0019122775,0.0006030361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012829212,0.00048036934,0.00019944957,0.0021424459,0.004732437,0.006273421,0.000969279,0.0013237882,0.044036],"category_scores_gemma":[0.003427014,0.00013651884,0.00013543745,0.003743236,0.0017179046,0.002894348,0.0012877659,0.0012693899,0.009011558],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029826031,0.000035031924,0.009487787,0.00011519337,0.000006534039,0.000109486835,0.001193475,0.00046648382,0.0009796239,0.0684657,0.7040221,0.21508868],"study_design_scores_gemma":[0.0000033074862,0.000007690049,0.011387815,0.000036348032,0.000003820882,0.000089221736,0.0009202533,0.00017767755,0.000244933,0.0014703943,0.9856405,0.000018008965],"about_ca_topic_score_codex":0.8903536,"about_ca_topic_score_gemma":0.9290924,"teacher_disagreement_score":0.10964638,"about_ca_system_score_codex":0.024555195,"about_ca_system_score_gemma":0.051939894,"threshold_uncertainty_score":0.22058415},"labels":[],"label_agreement":null},{"id":"W562290735","doi":"","title":"Pacific Transit Trifecta","year":2008,"lang":"en","type":"article","venue":"Railway age","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Light rail transit; Transit (satellite); Light rail; Rail transit; Transport engineering; Public transport; Transit system; Rapid transit; Service (business); Transit-oriented development; West coast; Engineering; Business; Geology; Oceanography","score_opus":0.026593507116154436,"score_gpt":0.2659457583833047,"score_spread":0.23935225126715026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W562290735","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023673015,0.00093579554,0.005039455,0.0017888115,0.0005043152,0.00022707802,0.00435004,0.0009522715,0.96252924],"genre_scores_gemma":[0.07204204,0.0023078185,0.010266258,0.0005550657,0.0000981103,0.00027574637,0.008613156,0.00037918362,0.9054626],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99980253,0.000012341879,0.000005178649,0.000047419217,0.00007586673,0.000056682024],"domain_scores_gemma":[0.9998317,0.0000073388096,0.000011522589,0.000012445898,0.000091861846,0.00004510915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014909089,0.0006415466,0.0001552375,0.0014918547,0.002569367,0.0015453075,0.00052733085,0.00046766517,0.113976374],"category_scores_gemma":[0.0002510465,0.00022029191,0.00024018166,0.0018514239,0.00039690785,0.00086052425,0.0014037036,0.0012705995,0.029982235],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024887102,0.00018343939,0.009060191,0.00044120403,0.00001586117,0.0012974512,0.0011743262,0.0011806021,0.0029845245,0.08303047,0.34699023,0.5533929],"study_design_scores_gemma":[0.000009210802,0.0000357602,0.005789792,0.00004700119,0.000005516558,0.0004137314,0.0005658455,0.00047203418,0.00048494947,0.0009383256,0.9912298,0.000008042067],"about_ca_topic_score_codex":0.08955157,"about_ca_topic_score_gemma":0.16737452,"teacher_disagreement_score":0.113976374,"about_ca_system_score_codex":0.0024230648,"about_ca_system_score_gemma":0.004966718,"threshold_uncertainty_score":0.38128895},"labels":[],"label_agreement":null},{"id":"W563778679","doi":"","title":"A Few Clean Breakthroughs","year":2013,"lang":"en","type":"article","venue":"Railway age","topic":"Vehicle emissions and performance","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Nitrogen oxides; Diesel fuel; Liquefied natural gas; Particulates; NOx; Agency (philosophy); Nitrogen oxide; Diesel locomotive; Ultra-low-sulfur diesel; Waste management; Transport engineering; Natural gas; Automotive engineering; Combustion","score_opus":0.009259393002325592,"score_gpt":0.20564196212976446,"score_spread":0.19638256912743887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W563778679","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009570071,0.16319056,0.01961393,0.44700378,0.09630094,0.00021523502,0.0020523956,0.0013569259,0.26069623],"genre_scores_gemma":[0.11765206,0.18451147,0.030445162,0.27307338,0.04394321,0.00044796497,0.0028252539,0.0017534154,0.34534806],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9930066,0.001290712,0.00026663486,0.0010708249,0.003295683,0.0010696257],"domain_scores_gemma":[0.99193597,0.0019217471,0.00036900447,0.0012717871,0.0030894685,0.0014120304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00786906,0.0014346732,0.00091796136,0.0016346229,0.004169209,0.007421538,0.0021346472,0.004955123,0.0352609],"category_scores_gemma":[0.015677888,0.0005434515,0.001238194,0.0012250872,0.0054428643,0.012519693,0.0054551084,0.011703826,0.017497111],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002483989,0.0003206283,0.0006756723,0.00132942,0.000071978495,0.00034326693,0.0007923905,0.00039363897,0.002415386,0.32733887,0.5083769,0.15769343],"study_design_scores_gemma":[0.000016231133,0.00011264942,0.00029626765,0.000318261,0.000012128603,0.000117786796,0.0004982957,0.00005650653,0.0007933723,0.038636934,0.9591209,0.000020600659],"about_ca_topic_score_codex":0.0044073444,"about_ca_topic_score_gemma":0.0066047437,"teacher_disagreement_score":0.0352609,"about_ca_system_score_codex":0.0039952295,"about_ca_system_score_gemma":0.008229215,"threshold_uncertainty_score":0.11795944},"labels":[],"label_agreement":null},{"id":"W565570145","doi":"","title":"HOW CPR DEFINES SCHEDULED RAILROADING","year":2003,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Yard; Tonnage; DOCK; Train; Schedule; Transport engineering; Track (disk drive); Workload; Expediting; Plan (archaeology); Freight trains; Telecommunications; Operations management; Engineering; Operations research; Computer science; Marine engineering","score_opus":0.022631886838395822,"score_gpt":0.19659413100794704,"score_spread":0.17396224416955122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W565570145","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010642919,0.0025658524,0.1666476,0.009484529,0.0028213141,0.00029098731,0.0024561165,0.0011141903,0.8039765],"genre_scores_gemma":[0.47579688,0.009307603,0.2576486,0.006612803,0.002709671,0.00072439795,0.008182646,0.0025028365,0.23651464],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99258524,0.0018681709,0.0006403158,0.0014381938,0.0022549825,0.0012132474],"domain_scores_gemma":[0.99221087,0.0015997747,0.00067822495,0.001150994,0.003699114,0.0006610881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037531415,0.00064430555,0.00047644976,0.004292877,0.0032541475,0.008586391,0.0021251654,0.0019287118,0.021760613],"category_scores_gemma":[0.014449796,0.0005153762,0.0008476518,0.0053426907,0.004226011,0.010783163,0.0030728825,0.0036867198,0.008128502],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014023739,0.000019107383,0.0012772139,0.000063130996,0.000006391413,0.00013262976,0.001033929,0.0013997423,0.0001270353,0.92032725,0.03543312,0.0401664],"study_design_scores_gemma":[0.000008199981,0.000027323966,0.002150091,0.00030071128,0.0000136798635,0.00040127008,0.0018218913,0.0028057497,0.00031306248,0.14217687,0.8499277,0.000053392112],"about_ca_topic_score_codex":0.097673856,"about_ca_topic_score_gemma":0.042603653,"teacher_disagreement_score":0.097673856,"about_ca_system_score_codex":0.0048553385,"about_ca_system_score_gemma":0.008805085,"threshold_uncertainty_score":0.19421065},"labels":[],"label_agreement":null},{"id":"W566209435","doi":"","title":"REMOTE CONTROL: TECHNOLOGY TRUMPS TRADITION","year":2003,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Control (management); Remote control; Engineering; Telecommunications; Business; Economics; Management; Electrical engineering","score_opus":0.013287680445648861,"score_gpt":0.18984040336341831,"score_spread":0.17655272291776947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W566209435","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013335452,0.12552787,0.046950575,0.18547232,0.0032613275,0.000049494673,0.00005985744,0.00039501465,0.6249481],"genre_scores_gemma":[0.5605541,0.15424988,0.022029154,0.0554277,0.012330542,0.00017107355,0.00008539125,0.00058953796,0.19456261],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99373746,0.0020840098,0.00035502727,0.0014863772,0.0019578028,0.00037928578],"domain_scores_gemma":[0.9912862,0.004941655,0.00044975424,0.0014277371,0.0012497088,0.0006449403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065383324,0.0004947756,0.0005725496,0.00162259,0.004891859,0.010661425,0.0011574097,0.004345393,0.0094217975],"category_scores_gemma":[0.007573083,0.00027819615,0.00025128212,0.0016508444,0.034422643,0.013967737,0.00484509,0.007396479,0.0027996076],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002554601,0.000029807237,0.00051649637,0.00018945127,0.000006658738,0.00008450819,0.0053721694,0.00021007295,0.00030709358,0.8919497,0.016533855,0.08477469],"study_design_scores_gemma":[0.000016093363,0.00008366914,0.0010154217,0.0010349284,0.000007996456,0.00031262386,0.0026027304,0.00046631176,0.00039060548,0.26388776,0.7301464,0.000035530775],"about_ca_topic_score_codex":0.005988068,"about_ca_topic_score_gemma":0.0040598772,"teacher_disagreement_score":0.010661425,"about_ca_system_score_codex":0.0052755754,"about_ca_system_score_gemma":0.0039709043,"threshold_uncertainty_score":0.03827715},"labels":[],"label_agreement":null},{"id":"W568310214","doi":"","title":"CN Again Shows the Way","year":2008,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bottleneck; Train; Telecommunications; Capital (architecture); Transport engineering; Computer science; Engineering; Operations management","score_opus":0.026911582269369693,"score_gpt":0.19915362813828516,"score_spread":0.17224204586891548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W568310214","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029074878,0.0007670777,0.0009859416,0.03981732,0.0041160034,0.000023578224,0.0005036163,0.00031199853,0.95056707],"genre_scores_gemma":[0.032105327,0.00066121615,0.0007060539,0.014494763,0.00027295903,0.000013533403,0.00028366662,0.00024016503,0.9512224],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99797183,0.00012318957,0.000027374219,0.00024773448,0.000980552,0.00064929185],"domain_scores_gemma":[0.9981623,0.000087621316,0.000039777635,0.00011307444,0.0010047938,0.0005925525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008485201,0.00048285248,0.00029226733,0.0009975211,0.0098326225,0.009588337,0.0008407616,0.0025426138,0.16206121],"category_scores_gemma":[0.002803328,0.000253679,0.00036769803,0.0011475098,0.0040484406,0.0034960567,0.0025104424,0.0040146247,0.04107217],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001921796,0.000011865997,0.001269974,0.000030017412,0.000004013777,0.00014214688,0.0014722954,0.00005881587,0.00034916462,0.12632634,0.8352219,0.035094317],"study_design_scores_gemma":[8.68621e-7,0.000002396844,0.00061896007,0.000015160892,0.0000012589593,0.00002884862,0.0009222157,0.000018967226,0.000076346056,0.0009846527,0.99732286,0.000007472875],"about_ca_topic_score_codex":0.80779904,"about_ca_topic_score_gemma":0.90535885,"teacher_disagreement_score":0.19220096,"about_ca_system_score_codex":0.021450745,"about_ca_system_score_gemma":0.019991737,"threshold_uncertainty_score":0.54214877},"labels":[],"label_agreement":null},{"id":"W571006931","doi":"","title":"Facing the Challenge of a Growth Industry","year":2005,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Commodity; Business; Economy; Economics; International trade; Engineering; Finance","score_opus":0.022885791053615084,"score_gpt":0.20865851248722322,"score_spread":0.18577272143360815,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W571006931","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022850467,0.015328873,0.00094856863,0.8814654,0.002183532,0.00001171375,0.000043870023,0.00004639647,0.07712114],"genre_scores_gemma":[0.6863634,0.048954304,0.002664162,0.14969088,0.008718216,0.00007256109,0.00014395553,0.0000871593,0.10330547],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972269,0.0008624107,0.00006489702,0.0002420405,0.00068732724,0.0009163507],"domain_scores_gemma":[0.99559766,0.00080049294,0.00033361875,0.00013187698,0.0012093898,0.0019270302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003930916,0.0003611813,0.00027341026,0.0009766718,0.0071404967,0.013271078,0.0006168193,0.006120808,0.005283293],"category_scores_gemma":[0.0054978845,0.0001820999,0.00019543638,0.0009878587,0.007521006,0.0089834165,0.0041292575,0.0069073634,0.0019010132],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047716978,0.000076276236,0.003297243,0.00015545564,0.000010591781,0.00043269643,0.0062428936,0.00062004454,0.0006293123,0.5771383,0.33697677,0.074372664],"study_design_scores_gemma":[0.000013551401,0.000052084055,0.0022676697,0.00023834233,0.0000060509055,0.000153946,0.018083138,0.0004591685,0.00024231742,0.14400028,0.83446276,0.000020775537],"about_ca_topic_score_codex":0.0113840075,"about_ca_topic_score_gemma":0.012741048,"teacher_disagreement_score":0.013271078,"about_ca_system_score_codex":0.0046621985,"about_ca_system_score_gemma":0.016697522,"threshold_uncertainty_score":0.03382677},"labels":[],"label_agreement":null},{"id":"W571859353","doi":"","title":"ECP BRAKING GETS RESULTS","year":2000,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Automotive engineering; Brake; Air brake; Fuel efficiency; Power consumption; Engineering; Dynamic braking; Braking distance; Electronic brakeforce distribution; Engine braking; Power (physics); Transport engineering; Braking system","score_opus":0.008440694317661632,"score_gpt":0.1953017954199994,"score_spread":0.18686110110233778,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W571859353","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68553287,0.0046484307,0.016781121,0.0009926591,0.0006997106,0.0066455523,0.013657288,0.0017214587,0.26932096],"genre_scores_gemma":[0.8457544,0.001450943,0.0058918544,0.0005716133,0.000062139974,0.0012782948,0.0073325452,0.0003149841,0.13734326],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966473,0.00032535786,0.00023724527,0.00031025292,0.0020099953,0.00046983187],"domain_scores_gemma":[0.9967391,0.00039625212,0.00008812025,0.00030293636,0.0023327174,0.0001408629],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002208182,0.00091353245,0.0006040674,0.0010697988,0.0010187809,0.0011957871,0.00083148107,0.0010099439,0.02715854],"category_scores_gemma":[0.0034040664,0.00021812183,0.00071993185,0.0008203373,0.0005899989,0.0006297292,0.0006161589,0.00082048535,0.008456283],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.011265762,0.008504155,0.015248426,0.002491799,0.00027132352,0.0005629578,0.00076865137,0.0065683094,0.04802429,0.0014658738,0.023203263,0.8816252],"study_design_scores_gemma":[0.0028493193,0.071852475,0.2681678,0.00077165465,0.0009996797,0.0017603955,0.0029930188,0.0067497077,0.2567694,0.002305951,0.3845516,0.00022890775],"about_ca_topic_score_codex":0.021836082,"about_ca_topic_score_gemma":0.025762415,"teacher_disagreement_score":0.02715854,"about_ca_system_score_codex":0.0011569567,"about_ca_system_score_gemma":0.002008707,"threshold_uncertainty_score":0.09085435},"labels":[],"label_agreement":null},{"id":"W572880788","doi":"","title":"Steady as She Goes: In Uncertain Times, Canadian Pacific Remains Focused on Long-Term Strategies","year":2008,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Train; Earnings; Finance; Bankruptcy; Business; Engineering; Transport engineering; Geography","score_opus":0.026923429679454828,"score_gpt":0.22176986522011252,"score_spread":0.1948464355406577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W572880788","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027971348,0.0037753794,0.0019922336,0.13116415,0.0023543132,0.0000760921,0.0014115247,0.00035196848,0.83090293],"genre_scores_gemma":[0.3323716,0.007722601,0.002972152,0.042669065,0.00046889752,0.0000684361,0.0011906074,0.0006100763,0.6119265],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9967174,0.0001996944,0.000043181793,0.00025141772,0.0015489435,0.0012394727],"domain_scores_gemma":[0.99173343,0.0002398522,0.00016729251,0.00017690723,0.004276113,0.0034064022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016783967,0.00064456376,0.00046627037,0.0018731252,0.032277912,0.012701302,0.0015016898,0.0021684698,0.04283009],"category_scores_gemma":[0.0052795103,0.0003302522,0.0003169916,0.0031007403,0.008142323,0.0050675925,0.0040488713,0.0056610545,0.005913258],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005768658,0.000036964433,0.010828099,0.00011235698,0.00002035571,0.0006409003,0.035081204,0.00023049276,0.00081352715,0.075521395,0.78312707,0.09352998],"study_design_scores_gemma":[0.000002484407,0.000007724789,0.004549251,0.000102546815,0.0000074574546,0.00011475414,0.025503246,0.00007165875,0.00009378778,0.0016048006,0.9679023,0.00004011125],"about_ca_topic_score_codex":0.9648286,"about_ca_topic_score_gemma":0.9876066,"teacher_disagreement_score":0.061875712,"about_ca_system_score_codex":0.061875712,"about_ca_system_score_gemma":0.13868003,"threshold_uncertainty_score":0.44894183},"labels":[],"label_agreement":null},{"id":"W575546716","doi":"","title":"Small Roads and Passenger Trains: A Natural Fit?","year":2010,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Train; Transport engineering; Freight trains; Track (disk drive); Passenger train; Passenger transport; Rail freight transport; Investment (military); Order (exchange); Rail network; Business; Engineering; Finance; Geography; Automotive engineering; Political science; Cartography","score_opus":0.02145764624987029,"score_gpt":0.2013880434101546,"score_spread":0.1799303971602843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W575546716","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06954223,0.02232691,0.010861037,0.42618182,0.004005529,0.00003613738,0.00027274247,0.00016839463,0.46660522],"genre_scores_gemma":[0.8830666,0.014105428,0.002092357,0.017639665,0.0022305625,0.00005634414,0.00012330635,0.00011031142,0.080575444],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993205,0.00033313027,0.000016605158,0.00010105216,0.00009460671,0.00013414252],"domain_scores_gemma":[0.99890053,0.0005398568,0.00013041975,0.0000780797,0.00012107044,0.00023002233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065644196,0.00030338095,0.00025652637,0.00073810003,0.0034643093,0.006415087,0.000581393,0.0027965326,0.0156137915],"category_scores_gemma":[0.002527239,0.00017174685,0.00021966646,0.0017564435,0.0116782235,0.010849068,0.0024566292,0.0032281473,0.00110219],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017620101,0.000015446165,0.0014379902,0.000045226556,0.00000360575,0.0001737578,0.003704615,0.00022356735,0.000037969257,0.9644719,0.018652614,0.011215753],"study_design_scores_gemma":[0.000013907833,0.000034666693,0.0026238402,0.00016640029,0.0000075110825,0.00046150287,0.02602625,0.00035869528,0.00006286601,0.39246103,0.57776433,0.000018907545],"about_ca_topic_score_codex":0.023393637,"about_ca_topic_score_gemma":0.038149394,"teacher_disagreement_score":0.023393637,"about_ca_system_score_codex":0.0025711835,"about_ca_system_score_gemma":0.0023882566,"threshold_uncertainty_score":0.05223334},"labels":[],"label_agreement":null},{"id":"W577274998","doi":"","title":"TIGHTENING UP THE BORDER","year":2002,"lang":"en","type":"article","venue":"Railway age","topic":"Transportation Safety and Impact Analysis","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Terrorism; Plan (archaeology); Computer security; Key (lock); Action plan; Business; Border Security; Blocking (statistics); Transport engineering; International trade; Engineering; Computer science; Economics; Political science; Law; Management","score_opus":0.015334268160193258,"score_gpt":0.22118202190043748,"score_spread":0.20584775374024422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W577274998","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33328024,0.0073924186,0.1037726,0.0446095,0.0045435457,0.0003369623,0.00033082196,0.0017018183,0.5040322],"genre_scores_gemma":[0.8748287,0.0034788484,0.034122344,0.009686241,0.00037326352,0.00010407885,0.00030612992,0.0002807354,0.0768197],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99730897,0.00050172256,0.0001228455,0.0004934888,0.0008026033,0.000770418],"domain_scores_gemma":[0.9965918,0.00041647238,0.00033110034,0.00071644504,0.0011299741,0.00081427174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032187048,0.00038965177,0.00039417972,0.0013802239,0.004852575,0.007299115,0.001281753,0.0028629643,0.019237485],"category_scores_gemma":[0.006811853,0.00039131404,0.0005829292,0.001447916,0.0027393363,0.00805361,0.008733801,0.0037638904,0.0032842895],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032737278,0.00029770413,0.01629922,0.00034964696,0.00007246177,0.0012416394,0.0076641925,0.0071225916,0.014540366,0.6279962,0.053338625,0.27075005],"study_design_scores_gemma":[0.000059772072,0.0004909157,0.020098409,0.0005600886,0.000092853916,0.00079281407,0.019560067,0.0037484434,0.004911276,0.122471355,0.82712424,0.000089796486],"about_ca_topic_score_codex":0.022195492,"about_ca_topic_score_gemma":0.026183935,"teacher_disagreement_score":0.022195492,"about_ca_system_score_codex":0.003913264,"about_ca_system_score_gemma":0.006293977,"threshold_uncertainty_score":0.06435579},"labels":[],"label_agreement":null},{"id":"W581517187","doi":"","title":"Cross-Country or Crosstown, Crossties Mark the Way","year":2013,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pace; Business; Industrial organization; Legislation; Finance; Commerce; Transport engineering; Engineering","score_opus":0.017241033161895757,"score_gpt":0.22725572334592267,"score_spread":0.2100146901840269,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W581517187","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16509432,0.0022623925,0.0038540552,0.0057113753,0.001995851,0.0000524076,0.0010230419,0.00019692162,0.8198097],"genre_scores_gemma":[0.43867466,0.0020506482,0.0038970434,0.0022518733,0.00015775682,0.00004126726,0.0010380779,0.00016486295,0.55172384],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99954396,0.000044814195,0.000017107224,0.000096336255,0.000113574555,0.0001841982],"domain_scores_gemma":[0.9995408,0.000040353134,0.00009346663,0.00004674996,0.000138614,0.00014009596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000311515,0.00029469066,0.00014306506,0.0005975936,0.002661524,0.0035199663,0.00037474526,0.00081950444,0.038410485],"category_scores_gemma":[0.0013022157,0.00014013547,0.0002049936,0.0012085732,0.0013192092,0.0027938664,0.0023242447,0.0015677947,0.0048376652],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018616075,0.000111827925,0.064590015,0.00025486154,0.00004425747,0.0017918911,0.020252319,0.000489826,0.0032860409,0.5192088,0.19899137,0.19079253],"study_design_scores_gemma":[0.0000046415826,0.000050695093,0.02891634,0.00014481657,0.000010375647,0.00052871817,0.013301732,0.00012630584,0.0006578721,0.0046862345,0.9515527,0.000019514824],"about_ca_topic_score_codex":0.042505685,"about_ca_topic_score_gemma":0.14618576,"teacher_disagreement_score":0.042505685,"about_ca_system_score_codex":0.002005425,"about_ca_system_score_gemma":0.001832164,"threshold_uncertainty_score":0.12849587},"labels":[],"label_agreement":null},{"id":"W584866576","doi":"","title":"SAFETY, INTERCHANGEABILITY GO HAND-IN-HAND","year":2000,"lang":"en","type":"article","venue":"Railway age","topic":"Transportation Systems and Infrastructure","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interchangeability; Warranty; Business; Safeguard; Transport engineering; Administration (probate law); Reliability (semiconductor); Engineering; Operations management; International trade; Political science","score_opus":0.012902162916162203,"score_gpt":0.21661249280635053,"score_spread":0.20371032989018834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W584866576","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018937176,0.009359021,0.021047564,0.05082108,0.0025162958,0.00005998313,0.0005048387,0.00049329223,0.89626074],"genre_scores_gemma":[0.53180146,0.015890721,0.010447501,0.012699375,0.0032517265,0.00013225236,0.0008433247,0.0005624867,0.42437115],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957853,0.0007765866,0.000286952,0.00046391517,0.0021190473,0.00056827994],"domain_scores_gemma":[0.99379784,0.0012876106,0.0009200926,0.0016533845,0.0017555804,0.0005855538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025173991,0.0007039191,0.00048774318,0.00228976,0.004324754,0.0126822395,0.0010199152,0.002520357,0.052195746],"category_scores_gemma":[0.009556984,0.00037959655,0.0005351673,0.0030393794,0.0085019,0.014365231,0.0061963573,0.0031241,0.019593539],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012700126,0.00008403161,0.0055356505,0.00027532416,0.000033491197,0.00027598994,0.0029188208,0.00073179236,0.00094497076,0.5831858,0.088616736,0.31727034],"study_design_scores_gemma":[0.000019545614,0.00010240964,0.0061208135,0.00034482413,0.000024253843,0.00053371384,0.0027066255,0.00036742116,0.0008327969,0.25103956,0.7378663,0.000041689993],"about_ca_topic_score_codex":0.011692646,"about_ca_topic_score_gemma":0.0068347864,"teacher_disagreement_score":0.052195746,"about_ca_system_score_codex":0.0027999803,"about_ca_system_score_gemma":0.004471565,"threshold_uncertainty_score":0.17461216},"labels":[],"label_agreement":null},{"id":"W592888159","doi":"","title":"CPR: PATIENCE, PRECISION, PRUDENCE","year":2004,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Prudence; Standardization; Patience; Productivity; Workforce; Preference; Plan (archaeology); Business; Class (philosophy); Finance; Industrial organization; Engineering; Economics; Computer science; Microeconomics; Artificial intelligence","score_opus":0.015028635677999632,"score_gpt":0.20579342092657335,"score_spread":0.1907647852485737,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W592888159","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0075674457,0.0031206114,0.011161063,0.20353581,0.0040739398,0.00010153694,0.000089101566,0.00034296446,0.77000767],"genre_scores_gemma":[0.64707065,0.004260004,0.010495128,0.053836238,0.005343421,0.00026197112,0.00013458921,0.0004173618,0.27818075],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.988665,0.004228449,0.00055913633,0.0009384378,0.004201641,0.0014073487],"domain_scores_gemma":[0.9781417,0.006093354,0.0025073125,0.0022584272,0.0054434096,0.0055557173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00714025,0.00044709866,0.00037597708,0.0012361876,0.00578824,0.014705264,0.0009942274,0.0040875594,0.017332064],"category_scores_gemma":[0.042131793,0.00031041395,0.00021608392,0.0012431778,0.014512906,0.0071506076,0.005943196,0.0057971207,0.007358884],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033490825,0.000043254215,0.0014260925,0.00011323708,0.000012020681,0.00038016203,0.006081285,0.00028340312,0.00026762477,0.61733156,0.27653977,0.097488046],"study_design_scores_gemma":[0.000014918034,0.000046924648,0.0022661372,0.00028986725,0.0000068187405,0.00069538655,0.0041336264,0.0003314447,0.00019837689,0.14711761,0.8448662,0.00003279288],"about_ca_topic_score_codex":0.0026770593,"about_ca_topic_score_gemma":0.0026763908,"teacher_disagreement_score":0.017332064,"about_ca_system_score_codex":0.004010438,"about_ca_system_score_gemma":0.008367648,"threshold_uncertainty_score":0.05798155},"labels":[],"label_agreement":null},{"id":"W593145472","doi":"","title":"THE MERGER END-GAME LOOMS. MIDYEAR REPORT","year":2000,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Consolidation (business); Agency (philosophy); Business; Finance; Economics; Market economy; Sociology","score_opus":0.011817142420792601,"score_gpt":0.19945031775399683,"score_spread":0.18763317533320423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W593145472","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07974283,0.039257504,0.003907533,0.23944265,0.026534984,0.0009115836,0.031056138,0.0031328918,0.5760139],"genre_scores_gemma":[0.19224586,0.012537012,0.0021116643,0.061874695,0.0050811623,0.0004453088,0.031807475,0.0004943866,0.69340247],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9940919,0.00039644053,0.00028661845,0.0002664174,0.0038147555,0.0011436958],"domain_scores_gemma":[0.9929946,0.0007461271,0.0009844071,0.00023341057,0.0031626155,0.0018788786],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040763123,0.0006059813,0.00029100748,0.0017881546,0.002310129,0.008854998,0.00094174885,0.0053569055,0.018694967],"category_scores_gemma":[0.009437845,0.0005756851,0.00047072835,0.0012382074,0.00042497288,0.00298102,0.0021513894,0.0036597594,0.010384766],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011970838,0.00015111039,0.004701691,0.000050347873,0.000008273761,0.00028339957,0.00015453728,0.00006960628,0.00047616157,0.0065844255,0.95447505,0.032925695],"study_design_scores_gemma":[0.000023165578,0.00017952644,0.039127033,0.000092882525,0.000012250132,0.00020271144,0.00042762057,0.00027532128,0.0010710035,0.0008935633,0.95766085,0.000034107645],"about_ca_topic_score_codex":0.029355453,"about_ca_topic_score_gemma":0.051698804,"teacher_disagreement_score":0.029355453,"about_ca_system_score_codex":0.0028109443,"about_ca_system_score_gemma":0.0077881124,"threshold_uncertainty_score":0.06254089},"labels":[],"label_agreement":null},{"id":"W594725858","doi":"","title":"TORONTO IN TRANSIT: A TALE OF TWO SYSTEMS","year":2003,"lang":"en","type":"article","venue":"Railway age","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transit (satellite); Transit system; Transport engineering; Rail transit; Bus rapid transit; Rapid transit; Light rail transit; Mile; Public transport; Urban transit; Business; Engineering; Geography","score_opus":0.016735342227073527,"score_gpt":0.28916722924881216,"score_spread":0.27243188702173865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W594725858","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030982303,0.026066715,0.046342444,0.16443865,0.0059811734,0.00035136062,0.0018624113,0.0011270506,0.7228478],"genre_scores_gemma":[0.49874377,0.033378657,0.04289079,0.013821,0.0016009478,0.00027907436,0.0020271612,0.00076311233,0.40649545],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983588,0.00038496926,0.000057468635,0.00020163436,0.00055132806,0.00044586108],"domain_scores_gemma":[0.99895906,0.000078657686,0.000042123145,0.000077763536,0.0002748016,0.00056755345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010755283,0.000971565,0.00040769475,0.0013630308,0.007197344,0.011308811,0.0010950075,0.00243739,0.023841182],"category_scores_gemma":[0.0018209751,0.0005090117,0.00058541296,0.0026846614,0.00467519,0.005293005,0.005052164,0.0026888214,0.002487043],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010757341,0.000054156142,0.0038538699,0.00029257065,0.00007109477,0.0005652027,0.0049381875,0.009665597,0.00086728943,0.6153891,0.26620236,0.09799308],"study_design_scores_gemma":[0.000013058883,0.000050946437,0.0017922889,0.00013936358,0.000037490463,0.00011122972,0.003916345,0.0028935936,0.0002971797,0.04451433,0.9461829,0.000051221105],"about_ca_topic_score_codex":0.48281515,"about_ca_topic_score_gemma":0.60164064,"teacher_disagreement_score":0.51718485,"about_ca_system_score_codex":0.030105209,"about_ca_system_score_gemma":0.020444075,"threshold_uncertainty_score":0.9600097},"labels":[],"label_agreement":null},{"id":"W597574531","doi":"","title":"ECP: HOW SOON?","year":2001,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fence (mathematics); Revenue; Service (business); Engineering; Transport engineering; Aeronautics; Business; Automotive engineering; Finance; Marketing","score_opus":0.010290089535851374,"score_gpt":0.1868596856173534,"score_spread":0.17656959608150202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W597574531","genre_codex":"commentary","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011639316,0.036975227,0.006024331,0.52748024,0.042073734,0.000082058395,0.0009723116,0.0009986954,0.37375414],"genre_scores_gemma":[0.11070638,0.051993243,0.0071817366,0.19817822,0.00812409,0.00011769687,0.0014652803,0.00081480655,0.6214186],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982339,0.00027659305,0.00008744212,0.00021098816,0.0007412306,0.00044974117],"domain_scores_gemma":[0.9968982,0.00033399495,0.00016515733,0.00019828406,0.001342998,0.0010613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016692072,0.00042629807,0.00030944182,0.0007209362,0.0025599394,0.006553813,0.00092429837,0.004706728,0.08800957],"category_scores_gemma":[0.008306197,0.00020324512,0.0003439201,0.0012185402,0.0014772268,0.009308997,0.0021967555,0.0034309833,0.03225528],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004657988,0.000060426017,0.0021679152,0.00022237176,0.000007133426,0.00039069258,0.0003841016,0.000045001223,0.00036437364,0.018343695,0.7179609,0.26000676],"study_design_scores_gemma":[0.000003427352,0.000023117855,0.0011470721,0.00020904103,0.000003656813,0.0006113145,0.0015823111,0.000025174228,0.00027181764,0.0033410527,0.99276936,0.000012731],"about_ca_topic_score_codex":0.005865764,"about_ca_topic_score_gemma":0.011589068,"teacher_disagreement_score":0.08800957,"about_ca_system_score_codex":0.0016164037,"about_ca_system_score_gemma":0.003240981,"threshold_uncertainty_score":0.29442132},"labels":[],"label_agreement":null},{"id":"W598638581","doi":"","title":"FINDING THE RIGHT PROFILE","year":2000,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Engineering and Dynamics","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Grinding; Transport engineering; Engineering; Rail transit; Transit (satellite); State (computer science); Business; Computer science; Public transport; Mechanical engineering","score_opus":0.005637887687681734,"score_gpt":0.19118183573282072,"score_spread":0.185543948045139,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W598638581","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07354036,0.0017745765,0.52904177,0.034803055,0.0037308577,0.00097022986,0.0010921527,0.005046789,0.35000026],"genre_scores_gemma":[0.31040618,0.0020229083,0.40363577,0.004987443,0.000555571,0.0003841081,0.0014020256,0.0029551946,0.27365085],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99703753,0.0004875467,0.00018970527,0.0006285894,0.0012303183,0.00042642068],"domain_scores_gemma":[0.9970317,0.00028410854,0.00023133443,0.000610329,0.0013178079,0.0005248671],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029414939,0.0007119882,0.0006012789,0.0015861305,0.003656461,0.004071601,0.0013380871,0.0021515172,0.055191353],"category_scores_gemma":[0.012250572,0.00067995884,0.00071962044,0.00082882046,0.0012214362,0.009320587,0.0034898375,0.0020709883,0.04038981],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016133019,0.0002866446,0.010838766,0.00021279183,0.000018591485,0.00090034853,0.003375023,0.0011720059,0.009907609,0.04094973,0.10046328,0.83171386],"study_design_scores_gemma":[0.00005760771,0.00043045223,0.0074625174,0.0008270375,0.00006331695,0.004436601,0.016407497,0.007859021,0.017852923,0.07723253,0.8671786,0.00019194477],"about_ca_topic_score_codex":0.0030501974,"about_ca_topic_score_gemma":0.008364653,"teacher_disagreement_score":0.055191353,"about_ca_system_score_codex":0.0013375852,"about_ca_system_score_gemma":0.0036723677,"threshold_uncertainty_score":0.1846335},"labels":[],"label_agreement":null},{"id":"W599113946","doi":"","title":"Midyear Report: America Takes the Train and Railroads are Enjoying the Ride","year":2008,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Boom; Train; Service (business); Finance; Truck; Quarter (Canadian coin); Stock (firearms); Business; Transport engineering; Economics; Economy; Engineering","score_opus":0.026747683862845966,"score_gpt":0.199947818089462,"score_spread":0.17320013422661604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W599113946","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012942966,0.005639584,0.0010803399,0.18179028,0.052488238,0.00076106563,0.089018464,0.0022381798,0.654041],"genre_scores_gemma":[0.02711726,0.005266079,0.0008990385,0.046278466,0.005880919,0.00043247305,0.0413211,0.0006145976,0.87219006],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985033,0.000080102924,0.00006688709,0.00013117242,0.00089985697,0.00031861148],"domain_scores_gemma":[0.9959734,0.00026469037,0.00022533846,0.00014327114,0.0025693104,0.00082402275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014037965,0.00067186536,0.00023518337,0.0012570873,0.0026205038,0.0046063373,0.0008627492,0.0027181685,0.06422783],"category_scores_gemma":[0.0040314402,0.00032991363,0.00035515375,0.0008821431,0.00034357767,0.002234909,0.0014931728,0.0036314877,0.035190698],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000088607085,0.000013308047,0.0006641553,0.000015732223,0.0000011079546,0.000026751844,0.000036196758,0.000006182375,0.00005844979,0.0004938655,0.995014,0.0036613608],"study_design_scores_gemma":[0.0000043010973,0.000015623806,0.0051114103,0.000037120324,0.0000028337543,0.000023197648,0.00021243888,0.000019127978,0.00008974303,0.00008178828,0.99439347,0.000009020539],"about_ca_topic_score_codex":0.067551434,"about_ca_topic_score_gemma":0.09919797,"teacher_disagreement_score":0.067551434,"about_ca_system_score_codex":0.0017422687,"about_ca_system_score_gemma":0.00827955,"threshold_uncertainty_score":0.21486348},"labels":[],"label_agreement":null},{"id":"W609850518","doi":"","title":"MEXICO: LAND OF OPPORTUNITY","year":2001,"lang":"en","type":"article","venue":"Railway age","topic":"International Relations in Latin America","field":"Social Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Free trade agreement; Land grant; International trade; Business; Geography; Economy; Economics; Free trade; Political science","score_opus":0.042511980972694256,"score_gpt":0.3497367641862328,"score_spread":0.3072247832135385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W609850518","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019903222,0.01634598,0.0005113188,0.026597392,0.0011348804,0.000050488983,0.002068963,0.00014532793,0.9332425],"genre_scores_gemma":[0.15777363,0.015313563,0.001243295,0.0024793975,0.0005531366,0.0001396577,0.0018258365,0.0001012894,0.82057023],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998437,0.000023339902,0.000004997306,0.000021054297,0.000030530602,0.00007634431],"domain_scores_gemma":[0.99989617,0.000012869977,0.000015897209,0.000011232514,0.000029903964,0.000033969172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001848577,0.00032237257,0.00023617389,0.00087309146,0.0030509299,0.003671021,0.0003855303,0.0011780356,0.10402911],"category_scores_gemma":[0.00044862746,0.00011360502,0.00013854692,0.0016024061,0.00067908305,0.001861832,0.0021139877,0.0011504337,0.007966274],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075393364,0.00004809752,0.006174555,0.0002525664,0.000009503726,0.0010279355,0.0024402945,0.00009758953,0.000495532,0.27419692,0.53721035,0.1779713],"study_design_scores_gemma":[0.0000017596903,0.000005271663,0.0026834854,0.000053617656,0.0000019568784,0.000107129046,0.0009839442,0.000019163599,0.000040798368,0.0011961057,0.9949045,0.0000023573907],"about_ca_topic_score_codex":0.033660743,"about_ca_topic_score_gemma":0.07058076,"teacher_disagreement_score":0.10402911,"about_ca_system_score_codex":0.002439139,"about_ca_system_score_gemma":0.002659602,"threshold_uncertainty_score":0.3480121},"labels":[],"label_agreement":null},{"id":"W616748409","doi":"","title":"Tackling Tehachapi: Experiments and analyses from the California mountains to the Quebec iron ore fields are quantifying the benefits of friction management","year":2005,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Engineering and Dynamics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Train; Freight trains; Track (disk drive); Engineering; Revenue; Automotive engineering; Schedule; Marine engineering; Transport engineering; Mechanical engineering; Computer science; Business","score_opus":0.029950418117883886,"score_gpt":0.26573816164452035,"score_spread":0.23578774352663648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W616748409","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99716634,0.000059111808,0.00032972312,0.000033972712,0.0000036532815,0.00006169789,0.00010284683,0.000024958244,0.0022176784],"genre_scores_gemma":[0.9914396,0.0001595113,0.0020910455,0.00006218035,0.0000043767136,0.000065344546,0.00046104696,0.00002116137,0.0056957495],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99953663,0.00003848062,0.000008877738,0.000094191215,0.00019046484,0.0001313619],"domain_scores_gemma":[0.9993969,0.000115631265,0.000057370933,0.000051510367,0.00027267777,0.00010574313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061715004,0.0004014378,0.0004343642,0.0005229493,0.002659014,0.00059686357,0.0009403855,0.0005116969,0.0018658281],"category_scores_gemma":[0.0008658284,0.00024420882,0.00027772153,0.0005600218,0.000965565,0.00043113556,0.00040492014,0.0008677834,0.00020190715],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0074344487,0.011956912,0.23356822,0.0010452954,0.00043194476,0.0035625251,0.010112291,0.047361072,0.42295146,0.0035588134,0.010498422,0.24751855],"study_design_scores_gemma":[0.00068600936,0.023758901,0.7430984,0.00011572496,0.00022598823,0.00051106187,0.011555127,0.02675002,0.16202164,0.00056858564,0.030559286,0.00014926857],"about_ca_topic_score_codex":0.67317355,"about_ca_topic_score_gemma":0.88561434,"teacher_disagreement_score":0.32682645,"about_ca_system_score_codex":0.004614633,"about_ca_system_score_gemma":0.0029091034,"threshold_uncertainty_score":0.6575024},"labels":[],"label_agreement":null},{"id":"W630724375","doi":"","title":"Watt's Up? A New Look at Electrification","year":2013,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Electrification; Watt; Mile; Transport engineering; Electricity; Engineering; Light rail transit; Telecommunications; Public transport; Business; Environmental science; Geography; Electrical engineering; Power (physics)","score_opus":0.01658409039008925,"score_gpt":0.19238910456637578,"score_spread":0.17580501417628652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W630724375","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017219594,0.11949433,0.003083177,0.53569394,0.010683931,0.000010787016,0.00011873196,0.00006403344,0.31363153],"genre_scores_gemma":[0.44035324,0.25805607,0.0025393458,0.11994083,0.01790259,0.00003569569,0.00015869383,0.00020924055,0.16080427],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936086,0.00022059602,0.000019491448,0.000067400324,0.00018560534,0.00014596924],"domain_scores_gemma":[0.9990068,0.00058560114,0.000057972826,0.0000589573,0.00017426524,0.000116425384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000796003,0.0003148351,0.0003281241,0.0013168494,0.0022000198,0.0061206804,0.0005248304,0.002493087,0.012087601],"category_scores_gemma":[0.002766046,0.00015239153,0.00033601918,0.002019136,0.0053354893,0.016613537,0.0016386986,0.0038649659,0.0007486994],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031357285,0.0000429198,0.0016715864,0.00023549274,0.0000178194,0.00037662615,0.0050475257,0.00051386136,0.0003245708,0.7067904,0.1703018,0.11464612],"study_design_scores_gemma":[0.0000031185953,0.000016792615,0.000989118,0.00038931618,0.0000050981603,0.00022798491,0.012599479,0.00014458569,0.00012284341,0.12714957,0.858334,0.000018054978],"about_ca_topic_score_codex":0.0051425914,"about_ca_topic_score_gemma":0.012967286,"teacher_disagreement_score":0.012087601,"about_ca_system_score_codex":0.0019571641,"about_ca_system_score_gemma":0.0013845454,"threshold_uncertainty_score":0.040437102},"labels":[],"label_agreement":null},{"id":"W632753893","doi":"","title":"MONTREAL: A GROWING ROLE FOR RAIL","year":2002,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rail transit; TRIPS architecture; Transit (satellite); Urban transit; Transport engineering; Agency (philosophy); Service (business); Urban rail; Public transport; Business; Geography; Regional science; Engineering; Marketing; Sociology","score_opus":0.020411860921003482,"score_gpt":0.19327337384777918,"score_spread":0.1728615129267757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W632753893","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013111907,0.027992781,0.0016974949,0.3099012,0.0066788676,0.00012664404,0.0033314198,0.0015116087,0.6356481],"genre_scores_gemma":[0.06580758,0.011121838,0.0021977036,0.011859991,0.0009461711,0.000026419313,0.0010363259,0.00019803266,0.9068059],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992281,0.000054282333,0.000013477515,0.00010148319,0.000360768,0.00024187763],"domain_scores_gemma":[0.9983463,0.000048182756,0.000066427485,0.000051806062,0.00049459696,0.0009926864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061065226,0.00047379264,0.00021251987,0.00080182415,0.0036560302,0.006218253,0.0010772347,0.0019666867,0.13240373],"category_scores_gemma":[0.0011067748,0.00020779512,0.00021229991,0.0019340558,0.0013039048,0.0021508294,0.0014832597,0.0019946024,0.009183331],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014504363,0.000016061453,0.001721298,0.00006533911,0.0000048136544,0.00013055398,0.0003049299,0.000106562366,0.0005290793,0.028676415,0.8996511,0.06877942],"study_design_scores_gemma":[0.0000018595983,0.0000030451768,0.0026243946,0.00001781088,0.0000013520907,0.000020553014,0.00021444364,0.000049895716,0.000041443305,0.00025280027,0.99676704,0.0000053858553],"about_ca_topic_score_codex":0.9022611,"about_ca_topic_score_gemma":0.94770694,"teacher_disagreement_score":0.13240373,"about_ca_system_score_codex":0.02510786,"about_ca_system_score_gemma":0.03955267,"threshold_uncertainty_score":0.44293463},"labels":[],"label_agreement":null},{"id":"W648506033","doi":"","title":"OTTAWA IN TRANSIT: RAIL IS THE FUTURE","year":2003,"lang":"en","type":"article","venue":"Railway age","topic":"Transportation Planning and Optimization","field":"Social Sciences","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Public transport; Light rail; Transit (satellite); Transport engineering; Light rail transit; Rail transit; Engineering; Service (business); Transit system; Rapid transit; Bus rapid transit; Business; Marketing","score_opus":0.012071675409444222,"score_gpt":0.2616918068428662,"score_spread":0.24962013143342196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W648506033","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012443509,0.16949925,0.0021689718,0.12848057,0.0038028632,0.000104041304,0.003123614,0.00023189187,0.68014526],"genre_scores_gemma":[0.26620772,0.19210641,0.0037243257,0.014841313,0.000695155,0.00007709994,0.0021579568,0.000141894,0.52004814],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987545,0.00013060942,0.00002787154,0.00011706637,0.0005946107,0.00037539843],"domain_scores_gemma":[0.99878067,0.00005791031,0.000060749302,0.000042441327,0.0007762055,0.0002820371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000662531,0.0006175152,0.00039581262,0.00096066896,0.0061726556,0.0076623172,0.00094805565,0.0017739387,0.029347502],"category_scores_gemma":[0.0015022848,0.000214571,0.0003366712,0.0029992724,0.0025252493,0.002829657,0.001298214,0.0016049293,0.0034619987],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008630128,0.000022873735,0.0037459855,0.0006970728,0.000031153937,0.00032424444,0.0017365644,0.0018539029,0.00057665,0.27474046,0.5471819,0.16900295],"study_design_scores_gemma":[0.0000021150797,0.000010100436,0.0020489513,0.00025771282,0.000019033976,0.000057428155,0.0016787384,0.00012284542,0.00007641021,0.0039600623,0.99174654,0.00002012366],"about_ca_topic_score_codex":0.9727664,"about_ca_topic_score_gemma":0.9889498,"teacher_disagreement_score":0.05071774,"about_ca_system_score_codex":0.05071774,"about_ca_system_score_gemma":0.088379934,"threshold_uncertainty_score":0.3679847},"labels":[],"label_agreement":null},{"id":"W651314353","doi":"","title":"HANDS FREE TO THE AIRPORT","year":2004,"lang":"en","type":"article","venue":"Railway age","topic":"Aviation Industry Analysis and Trends","field":"Economics, Econometrics and Finance","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"International airport; Kuala lumpur; Aviation; Administration (probate law); Service (business); Transport engineering; Aeronautics; Business; Telecommunications; Engineering; Marketing; Political science","score_opus":0.036122110776834054,"score_gpt":0.2218172688826908,"score_spread":0.18569515810585674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W651314353","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014560362,0.0010532871,0.001629174,0.008386861,0.008455784,0.000103549035,0.002489378,0.0038042741,0.9726217],"genre_scores_gemma":[0.0034707568,0.0004144244,0.00033196915,0.0021184913,0.00090939255,0.000035448356,0.00060368935,0.00027730395,0.99183863],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995223,0.000063249354,0.00002434604,0.00009528452,0.00017368884,0.00012115159],"domain_scores_gemma":[0.9984017,0.00012844767,0.00006500205,0.00025912054,0.00039467367,0.0007511241],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00051271927,0.0010157954,0.00068319537,0.000734323,0.0017709984,0.0042122286,0.00079349545,0.0016308258,0.85580957],"category_scores_gemma":[0.0025427118,0.0002994807,0.00046289735,0.00045453274,0.00056317134,0.0026756972,0.0038241623,0.0021189798,0.79483384],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028943976,0.000032724245,0.0001222259,0.000033238026,0.0000018834339,0.00006428266,0.00006719178,0.00002347758,0.00035970402,0.0011802668,0.94370276,0.054383468],"study_design_scores_gemma":[0.0000072730377,0.00001715478,0.0003332848,0.000031791693,9.68521e-7,0.00006703794,0.00007943729,0.000022334036,0.0000884711,0.0005530219,0.99879396,0.0000052749483],"about_ca_topic_score_codex":0.0013287662,"about_ca_topic_score_gemma":0.004148382,"teacher_disagreement_score":0.85580957,"about_ca_system_score_codex":0.00051373313,"about_ca_system_score_gemma":0.0010336776,"threshold_uncertainty_score":0.20567006},"labels":[],"label_agreement":null},{"id":"W652101405","doi":"","title":"Profitable Under Pressure","year":2012,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Deregulation; Revenue; Market share; Automotive industry; Scrap; Government (linguistics); Competition (biology); Business; Economy; Economics; Engineering; Market economy; Finance","score_opus":0.023592699620318288,"score_gpt":0.2127852430912503,"score_spread":0.189192543470932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W652101405","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013391219,0.00063299417,0.0021808695,0.013509042,0.0010514994,0.00010731493,0.00036848793,0.00019687795,0.96856165],"genre_scores_gemma":[0.23280561,0.0024387324,0.0026459745,0.014313024,0.0021619946,0.00023821322,0.0011549221,0.0004083621,0.7438332],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99653673,0.00039619548,0.00009321539,0.00043729847,0.0016022538,0.0009342646],"domain_scores_gemma":[0.9972357,0.0002807139,0.00023615519,0.00035986482,0.00074268755,0.0011448349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015450382,0.0007910312,0.00045984212,0.0017155128,0.00392603,0.010612518,0.0013668524,0.002069229,0.21607195],"category_scores_gemma":[0.0061990446,0.00027487313,0.00046272614,0.0014896741,0.002434831,0.006326523,0.006723063,0.0036584,0.06120835],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008845636,0.00018384884,0.0057238415,0.00013177382,0.000021611708,0.0010699006,0.0027024802,0.00028948428,0.0012290792,0.46296075,0.3493128,0.17628592],"study_design_scores_gemma":[0.000009174417,0.00005065157,0.00193685,0.0001078732,0.000005398678,0.0003187712,0.0018719016,0.00018261968,0.00022245455,0.02954884,0.9657317,0.000013742465],"about_ca_topic_score_codex":0.00298156,"about_ca_topic_score_gemma":0.004425301,"teacher_disagreement_score":0.21607195,"about_ca_system_score_codex":0.0023070693,"about_ca_system_score_gemma":0.005107937,"threshold_uncertainty_score":0.7228327},"labels":[],"label_agreement":null},{"id":"W653539624","doi":"","title":"Freight Cars: A Red-hot Market","year":2011,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Incentive; Order (exchange); Quarter (Canadian coin); Economic shortage; Haulage; Engineering; Business; Economics; Finance; Market economy","score_opus":0.030265124070173222,"score_gpt":0.18847419139868893,"score_spread":0.1582090673285157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W653539624","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.081434876,0.01792207,0.0025638428,0.2740037,0.0046582925,0.000040759718,0.0006890332,0.0005215756,0.61816585],"genre_scores_gemma":[0.49733406,0.016919388,0.0014058035,0.05928475,0.0058001014,0.000034752433,0.00057095534,0.00027500562,0.4183752],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99899715,0.00012081767,0.0000203251,0.0001234936,0.0004767359,0.00026145915],"domain_scores_gemma":[0.9992613,0.00013210565,0.000093415365,0.000048438345,0.00023980127,0.0002249142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011659036,0.00041380932,0.00018836267,0.0014027902,0.0032933303,0.009766498,0.0006136865,0.0028798194,0.025312105],"category_scores_gemma":[0.0014479844,0.00019917382,0.0001927515,0.0021026933,0.0027096288,0.010481952,0.0014387976,0.0028058004,0.0037787687],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006685436,0.000059262118,0.0013795028,0.000083550825,0.0000058315613,0.0004894532,0.0024084128,0.00040829583,0.0013987055,0.53601813,0.38420135,0.07348057],"study_design_scores_gemma":[0.0000066015045,0.000027140117,0.0029929762,0.00005431931,0.0000027183,0.00017364914,0.0030271767,0.00037093792,0.00042423935,0.013835159,0.9790662,0.000018796973],"about_ca_topic_score_codex":0.019523364,"about_ca_topic_score_gemma":0.033498447,"teacher_disagreement_score":0.025312105,"about_ca_system_score_codex":0.006242951,"about_ca_system_score_gemma":0.003100553,"threshold_uncertainty_score":0.0846774},"labels":[],"label_agreement":null},{"id":"W656943707","doi":"","title":"NORTH AMERICA'S RAIL TRANSIT MARKET: WHERE IT IS, WHERE IT WILL BE. IN: PASSENGER RAIL PLANNER'S GUIDE 2000","year":2000,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rail transit; Public transport; Planner; Transit (satellite); Transport engineering; Light rail transit; Bus rapid transit; Transit system; Business; Urban rail transit; Rail transportation; Engineering; Computer science","score_opus":0.011295474644371258,"score_gpt":0.20329091054847062,"score_spread":0.19199543590409937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W656943707","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004214811,0.06457291,0.004226861,0.050449423,0.003331253,0.00024210491,0.0510147,0.0025552728,0.8193926],"genre_scores_gemma":[0.021452907,0.08806699,0.008566559,0.0051110447,0.0005145016,0.00024983933,0.026881998,0.00046520415,0.84869105],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99985075,0.000016223566,0.00001224013,0.000020142013,0.000078714824,0.000021868076],"domain_scores_gemma":[0.9997838,0.000027965263,0.00002418399,0.000005614295,0.00010715224,0.000051268013],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020305412,0.00074126036,0.00027955376,0.0010808881,0.00083899533,0.003099691,0.00046400883,0.0012776714,0.1156616],"category_scores_gemma":[0.00063318486,0.00047274894,0.00013315387,0.0026432525,0.00041458005,0.003336,0.0006422612,0.0015002205,0.049575023],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026895962,0.000007635723,0.00025691706,0.000059626782,5.772638e-7,0.000018656146,0.00013477208,0.000077101155,0.00004709626,0.0019056641,0.9467078,0.050781574],"study_design_scores_gemma":[0.0000013092517,0.0000028015936,0.0019518189,0.00013008088,9.637463e-7,0.000025409196,0.00037887998,0.00005442804,0.00002083357,0.0009304448,0.9964987,0.000004212506],"about_ca_topic_score_codex":0.10956504,"about_ca_topic_score_gemma":0.33734858,"teacher_disagreement_score":0.1156616,"about_ca_system_score_codex":0.0014397358,"about_ca_system_score_gemma":0.004145836,"threshold_uncertainty_score":0.3869266},"labels":[],"label_agreement":null},{"id":"W657895584","doi":"","title":"RAILROADING IN 2003. PART 1: CHANGE IS IN THE AIR","year":2002,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Legislature; Economy; Engineering; Political science; Business; Geography; Economics; Archaeology","score_opus":0.0638636805205012,"score_gpt":0.21663171696415795,"score_spread":0.15276803644365675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W657895584","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058247622,0.030965578,0.0012952341,0.20463973,0.03158839,0.0005070698,0.05097456,0.0011972025,0.62058455],"genre_scores_gemma":[0.1473771,0.01328272,0.0012245475,0.04239378,0.0015121793,0.00039791293,0.02091546,0.00020401536,0.7726924],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990451,0.000057173802,0.000096997115,0.00014527564,0.00042985004,0.00022564766],"domain_scores_gemma":[0.99868006,0.00009306873,0.00021750771,0.000064751126,0.0006915981,0.00025307728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012838085,0.00032288532,0.00020919341,0.001023139,0.002128345,0.0036319313,0.00064532785,0.0039803865,0.014163469],"category_scores_gemma":[0.003210706,0.00019652038,0.0002779716,0.0033857264,0.0005096489,0.001176905,0.00082621706,0.00216018,0.006671544],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006061227,0.00004065925,0.006415048,0.00022726342,0.000006353993,0.00019748133,0.0013799343,0.0001494274,0.0004394249,0.008644996,0.93506444,0.04737436],"study_design_scores_gemma":[0.000003905491,0.000010784364,0.031848677,0.00012760294,0.0000036876825,0.000056255467,0.0010287918,0.000045695433,0.0002891805,0.00035145186,0.96622556,0.000008352558],"about_ca_topic_score_codex":0.25707763,"about_ca_topic_score_gemma":0.44091186,"teacher_disagreement_score":0.25707763,"about_ca_system_score_codex":0.008170275,"about_ca_system_score_gemma":0.007867151,"threshold_uncertainty_score":0.5111625},"labels":[],"label_agreement":null},{"id":"W745467051","doi":"","title":"The Long and the Short of Distributed Power","year":2011,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Engineering and Dynamics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Train; Payload (computing); Freight trains; Engineering; Automotive engineering; Productivity; Transport engineering; Computer science; Economics","score_opus":0.007620743898893306,"score_gpt":0.18006257212480584,"score_spread":0.17244182822591253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W745467051","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038454406,0.08184125,0.06747685,0.142679,0.009876098,0.00008961469,0.0006267087,0.00048297344,0.65847313],"genre_scores_gemma":[0.4911861,0.02932929,0.010613387,0.017571496,0.00434548,0.00007826079,0.00027931127,0.0004104281,0.4461863],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99759847,0.00029106712,0.00006548089,0.00034240415,0.0011526342,0.00054990017],"domain_scores_gemma":[0.99798155,0.00035988213,0.000106352556,0.00030778415,0.00073526276,0.00050921924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016544461,0.0005630608,0.0003521855,0.0007643987,0.003867752,0.005690206,0.0012998149,0.002430979,0.014772585],"category_scores_gemma":[0.0029305038,0.00028926152,0.0003198107,0.0010600499,0.0068837907,0.008580316,0.0037097477,0.0037116655,0.0018237369],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017268174,0.000047017336,0.0042031636,0.00039057873,0.000045571116,0.0008197944,0.0021882295,0.002287054,0.0027472929,0.6143785,0.09607986,0.27664027],"study_design_scores_gemma":[0.000011881157,0.00009551135,0.0035124135,0.00023993172,0.00001737617,0.0005664765,0.0019318992,0.0012462632,0.0006427313,0.05652387,0.9351692,0.00004249408],"about_ca_topic_score_codex":0.15161607,"about_ca_topic_score_gemma":0.1992625,"teacher_disagreement_score":0.15161607,"about_ca_system_score_codex":0.010144527,"about_ca_system_score_gemma":0.009211206,"threshold_uncertainty_score":0.30146712},"labels":[],"label_agreement":null},{"id":"W748753638","doi":"","title":"How Fluid is your Yard","year":2005,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Engineering and Dynamics","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Yard; Bridge (graph theory); Architecture; Transport engineering; Engineering; Class (philosophy); Telecommunications; Civil engineering; Computer science; Archaeology; History","score_opus":0.010330645492101272,"score_gpt":0.20015746379312824,"score_spread":0.18982681830102696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W748753638","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1333083,0.011470594,0.04859065,0.12684417,0.009689171,0.00017236882,0.0010032333,0.003759652,0.6651619],"genre_scores_gemma":[0.6557022,0.0057258066,0.016505813,0.01023635,0.0013307276,0.000085748165,0.00049488875,0.002115969,0.3078026],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99678636,0.00056423893,0.00013951524,0.00043384513,0.0014913145,0.00058476976],"domain_scores_gemma":[0.9968928,0.00027547433,0.00031518296,0.0002609639,0.0013796133,0.0008759868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019344038,0.0007895747,0.0005316353,0.0013040117,0.006567503,0.015703553,0.001315684,0.0025678985,0.036141224],"category_scores_gemma":[0.010375841,0.0004552061,0.0005442636,0.0010032873,0.005668524,0.012662105,0.0038080504,0.0022497033,0.020808235],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000418985,0.00028104064,0.024938686,0.00064838486,0.0001129533,0.0015799605,0.026102016,0.002063566,0.006619514,0.1749581,0.36675027,0.39552644],"study_design_scores_gemma":[0.000012249089,0.000121302204,0.005355502,0.00033587805,0.000027681966,0.00062621984,0.023066593,0.0006064595,0.0015982699,0.027621165,0.94050735,0.00012129699],"about_ca_topic_score_codex":0.012662159,"about_ca_topic_score_gemma":0.013111347,"teacher_disagreement_score":0.036141224,"about_ca_system_score_codex":0.0027475334,"about_ca_system_score_gemma":0.0030915975,"threshold_uncertainty_score":0.120904386},"labels":[],"label_agreement":null},{"id":"W765329146","doi":"","title":"LRT for Canada's Capital","year":2013,"lang":"en","type":"article","venue":"Railway age","topic":"Railway Systems and Energy Efficiency","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Light rail transit; Light rail; Transport engineering; Transit (satellite); Rail transit; Right of way; Public transport; Rapid transit; Capital (architecture); Spring (device); Private capital; Engineering; Business; Telecommunications; Geography; Economics","score_opus":0.004737990839010995,"score_gpt":0.164913875595621,"score_spread":0.16017588475661002,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W765329146","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002872474,0.0032082621,0.00095669227,0.021101963,0.0039144093,0.00015679954,0.01145412,0.0013961882,0.95493907],"genre_scores_gemma":[0.0058739316,0.0007642319,0.00051203073,0.0012543385,0.000085423635,0.000022041046,0.0020858394,0.00020320555,0.9891991],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986253,0.000028527062,0.000023731802,0.00015340322,0.00075494393,0.0004141723],"domain_scores_gemma":[0.99706286,0.000049266473,0.000045627614,0.0001558447,0.001932862,0.00075351837],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00057565654,0.0007646694,0.00053335493,0.0015718259,0.0057827327,0.005849997,0.001225292,0.001990758,0.3789032],"category_scores_gemma":[0.0021612893,0.00041069978,0.00055475504,0.0018177441,0.00088913867,0.0014891429,0.0020910567,0.002250712,0.11284423],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003547291,0.000015899364,0.000483342,0.00005917254,0.0000048587763,0.0001184219,0.000073190866,0.000103906415,0.00021782034,0.019447844,0.93733436,0.04210578],"study_design_scores_gemma":[0.000003398811,0.00000436483,0.00065333955,0.00002854188,0.0000015965633,0.000036428937,0.000062644016,0.00006380321,0.000060636634,0.00035831853,0.998722,0.000004883406],"about_ca_topic_score_codex":0.92860276,"about_ca_topic_score_gemma":0.9615589,"teacher_disagreement_score":0.3789032,"about_ca_system_score_codex":0.033744916,"about_ca_system_score_gemma":0.10470502,"threshold_uncertainty_score":0.8859192},"labels":[],"label_agreement":null},{"id":"W797144736","doi":"","title":"THE POWER OF REMOTE CONTROL","year":2005,"lang":"en","type":"article","venue":"Railway age","topic":"Risk and Safety Analysis","field":"Decision Sciences","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interim; Remote control; Yard; Control (management); Engineering; Transport engineering; Telecommunications; Aeronautics; Electrical engineering; Computer science; Law; Political science","score_opus":0.03405763182102087,"score_gpt":0.33222520199199834,"score_spread":0.2981675701709775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W797144736","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036937404,0.03179935,0.3826486,0.023620268,0.001858507,0.00019894137,0.00032634928,0.0019779205,0.5206326],"genre_scores_gemma":[0.82627666,0.01992262,0.07665546,0.005211082,0.003145065,0.00021840022,0.0003538932,0.00038732213,0.06782949],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9948502,0.0013967484,0.00016442586,0.00094681425,0.002331402,0.00031053284],"domain_scores_gemma":[0.9887919,0.0060412274,0.00085389166,0.0020750114,0.0017378371,0.0005002255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034898145,0.000877809,0.0005998954,0.0017551893,0.0010966292,0.0057764906,0.0015930814,0.001774942,0.012532279],"category_scores_gemma":[0.010532668,0.00036654327,0.0005832115,0.00094887713,0.0052805096,0.0064946907,0.0039060256,0.0025037038,0.0045993854],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027213342,0.0001329804,0.0056669414,0.0005869889,0.00012690375,0.0004109112,0.0012531546,0.0071531516,0.005322835,0.43169665,0.01976839,0.52760893],"study_design_scores_gemma":[0.000102157086,0.0006178589,0.006756497,0.0010934492,0.00011770203,0.0020123525,0.001252625,0.020438688,0.008338273,0.3377013,0.62134266,0.00022650852],"about_ca_topic_score_codex":0.0036923566,"about_ca_topic_score_gemma":0.0016525979,"teacher_disagreement_score":0.012532279,"about_ca_system_score_codex":0.0010655944,"about_ca_system_score_gemma":0.0016014514,"threshold_uncertainty_score":0.041924596},"labels":[],"label_agreement":null},{"id":"W840598063","doi":"","title":"Can Railroads Keep the Good Times Rolling","year":2006,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Competition (biology); Government (linguistics); Product (mathematics); Business; Finance; Engineering; Economy; Economics","score_opus":0.00958805554829108,"score_gpt":0.18135957202113953,"score_spread":0.17177151647284844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W840598063","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031625707,0.0065716966,0.0016694325,0.592777,0.007700687,0.000030383448,0.0007147483,0.0005252734,0.35838512],"genre_scores_gemma":[0.54873204,0.009732235,0.0018703836,0.0944547,0.0022239746,0.00005772222,0.0008280498,0.0005848481,0.34151608],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979791,0.00029710217,0.000053819265,0.00018022752,0.0005204394,0.00096929894],"domain_scores_gemma":[0.99640536,0.00031319642,0.00040346867,0.00024754246,0.0014438211,0.0011866252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002381827,0.0003470737,0.00030054414,0.0011446631,0.004217406,0.012066096,0.00087859266,0.0047129644,0.04018678],"category_scores_gemma":[0.01250795,0.00021162591,0.0003576398,0.0017077992,0.0024906097,0.011238641,0.0024536161,0.0040789964,0.012764397],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014490454,0.00005673299,0.0048854616,0.0001505212,0.000033294815,0.00015928954,0.0034947852,0.0004622979,0.0003938955,0.26236612,0.6435279,0.08432475],"study_design_scores_gemma":[0.0000073876117,0.00003221764,0.0029577217,0.0001466234,0.0000106178895,0.00003106518,0.0068635596,0.000095384006,0.00013389572,0.015104945,0.97458714,0.000029476758],"about_ca_topic_score_codex":0.0704945,"about_ca_topic_score_gemma":0.10215053,"teacher_disagreement_score":0.0704945,"about_ca_system_score_codex":0.004792612,"about_ca_system_score_gemma":0.0076507595,"threshold_uncertainty_score":0.14016837},"labels":[],"label_agreement":null},{"id":"W841457592","doi":"","title":"2008 Freight Rail Outlook: Railroads Under Siege","year":2007,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Siege; Legislation; Futures contract; Neglect; Economics; Freight trains; Law; Economy; Train; Political science; Finance; History","score_opus":0.01978537975393139,"score_gpt":0.21444570242677102,"score_spread":0.19466032267283964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W841457592","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086908944,0.011226809,0.000598904,0.53636086,0.013092069,0.00003561944,0.003837878,0.0005027476,0.34743613],"genre_scores_gemma":[0.38339654,0.018544115,0.0005211969,0.19735861,0.010785963,0.00008503439,0.004374441,0.00039628914,0.38453776],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986343,0.000119145974,0.000082313214,0.00015284937,0.00060894707,0.00040249675],"domain_scores_gemma":[0.9981857,0.00042111115,0.00044390737,0.00007131044,0.00075367943,0.00012415016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014312208,0.0003600684,0.00025954895,0.0010704522,0.004880885,0.0063182763,0.0006574716,0.007342899,0.015284607],"category_scores_gemma":[0.0052026976,0.00021438615,0.00031823278,0.0024646043,0.0010820321,0.0034408446,0.0015474431,0.0068681124,0.0037973858],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063666754,0.000019666433,0.006089269,0.00015666048,0.000009807194,0.00063405576,0.0043786643,0.0002605589,0.0004883462,0.03397108,0.9351816,0.018746587],"study_design_scores_gemma":[0.0000041315666,0.000016186075,0.008971246,0.0001227447,0.000006617795,0.0000667797,0.0041557555,0.000069937414,0.00017627666,0.0007352829,0.9856544,0.00002058546],"about_ca_topic_score_codex":0.10222296,"about_ca_topic_score_gemma":0.15286615,"teacher_disagreement_score":0.10222296,"about_ca_system_score_codex":0.0047515677,"about_ca_system_score_gemma":0.004035208,"threshold_uncertainty_score":0.20325589},"labels":[],"label_agreement":null},{"id":"W847834396","doi":"","title":"Keep Them Moving","year":2005,"lang":"en","type":"article","venue":"Railway age","topic":"Transport and Economic Policies","field":"Business, Management and Accounting","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Truck; Competitor analysis; Asset management; Service (business); Asset (computer security); Transport engineering; Work (physics); Plan (archaeology); Product (mathematics); Operations research; Operations management; Computer science; Engineering; Business; Marketing; Finance; Computer security","score_opus":0.021809295200855377,"score_gpt":0.20033839864018213,"score_spread":0.17852910343932676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W847834396","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022002678,0.013958338,0.017952083,0.36187187,0.04770629,0.00023846894,0.0011610932,0.0032260509,0.5318832],"genre_scores_gemma":[0.078197755,0.00964762,0.013506948,0.13220982,0.00470265,0.0002459969,0.0015747803,0.0021401513,0.7577742],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99513113,0.00082753814,0.00017300775,0.0009688293,0.0014606484,0.0014388764],"domain_scores_gemma":[0.9934562,0.00042874814,0.00036117865,0.0006409929,0.0019614103,0.0031514512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003287022,0.0013483006,0.0009022519,0.0015559188,0.013855731,0.015877338,0.0023560445,0.006457059,0.12154785],"category_scores_gemma":[0.012382332,0.000589067,0.0009964078,0.0010626925,0.006396104,0.017954,0.015282663,0.011133068,0.08742808],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009213248,0.00010227005,0.0022627553,0.00016574662,0.000040521925,0.0005577214,0.00953074,0.00012328102,0.0014117466,0.044459075,0.79237604,0.14887789],"study_design_scores_gemma":[0.0000046647056,0.000029516674,0.0005267198,0.000119705444,0.000010944108,0.00014477759,0.0051801507,0.000025968333,0.0001589578,0.005219151,0.988562,0.000017412878],"about_ca_topic_score_codex":0.011813761,"about_ca_topic_score_gemma":0.024406042,"teacher_disagreement_score":0.12154785,"about_ca_system_score_codex":0.003700788,"about_ca_system_score_gemma":0.009047558,"threshold_uncertainty_score":0.40661806},"labels":[],"label_agreement":null}]}